Skip to content
Back to announcement

20240110_MDKA_Laporan Penggunaan Dana Hasil Penawaran Umum_31567445.pdf

Other Text extracted MDKA

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 16

Page 1
Go To English Page

 Nomor Surat                           007/MDKA-JKT/CORSEC/I/2024

 Nama Perusahaan                       PT Merdeka Copper Gold Tbk.

 Kode Emiten                           MDKA

 Lampiran                              1

 Perihal                               Laporan Penggunaan Dana Hasil Penawaran Umum


Dana yang diperoleh dari Penawaran Umum IDR

                                                                              Rencana    Realisasi
                                            Jumlah
                                                          Biaya     Hasil    Penggunaa Penggunaa
                                              Hasil
  Jenis                                                Penawaran Realisasi     n Dana     n Dana   Sisa Dana
                            Tanggal        Penawaran
Penawaran Nama Emisi                                     Umum       Bersih    Menurut    Menurut    (satuan
                             Efektif         Umum
  Umum                                                (satuan mata (satuan   Prospektus Prospektus mata uang)
                                            (satuan
                                                          uang)   mata uang)   (satuan    (satuan
                                           mata uang)
                                                                             mata uang) mata uang)
              Obligasi
            Berkelanjuta
    IPO         n IV        05
                                  3.100.555.00 22.728.000.0 3.077.827.00 3.077.827.00 3.077.827.00
Obligasi/Suk Merdeka     Desember                                                                           0
                                      0.000         00         0.000        0.000        0.000
     uk     Copper Gold    2022
              Tahap I
            Tahun 2022

Penempatan Sisa Dana

     Jenis
                     Kode Nama
   Penawaran                                                         Penempatan List
                        Efek
     Umum
                                     Sisa Dana                                                         Hubungan
                                                    Tingkat Bunga/                     Jangka Waktu
                                   (satuan mata                       Penempatan                        dengan
                                                       Bagi Hasil                      Penyimpanan
                                       uang)                                                          Perusahaan
                                                                   Saldo bank
                    Obligasi
                                                                  dalam bentuk
                Berkelanjutan IV
      IPO                                                        Giro Rupiah dan
                Merdeka Copper
 Obligasi/Sukuk                                                     USD pada
                 Gold Tahap I                                                    31 Desember
                                           0           6,1     %      HSBC                            pihak Tiga
                  Tahun 2022                                                         2023
                                                                 Indonesia, UOB
                                                                 Indonesia, BRI,
                                                                   dan Mizuho
                                                                    Indonesia
Page 2
Rincian Rencana Penawaran Umum

    Jenis
               Kode Nama
  Penawaran                 Tanggal Efektif   Rencana List
                  Efek
    Umum
Page 3
   Jenis
                 Kode Nama
 Penawaran                     Tanggal Efektif                         Rencana List
                    Efek
   Umum
                                                     Hasil
                                                   Realisasi                      Jumlah
                                                    Bersih        Uraian       (satuan mata     Persentase
                                                 (satuan mata                      uang)
                                                     uang)
                                                               Sekitar 31%
                                                             akan digunakan
                                                             oleh Perseroan
                                                             untuk melunasi
                                                                   Obligasi
                                            959.000.000.00 Berkelanjutan III 959.000.000.00
                                                                                                 31      %
                                                   0          Tahap I Seri A         0
                                                                   sebesar
                                                             Rp959.000 juta
                                                             yang akan jatuh
                                                               tempo pada
                                                            tanggal 15 Maret
                                                               Sekitar 51%
                                                             akan digunakan
                                                              oleh BSI untuk
                                                                  mendanai
                                                               pembayaran
                                                                 utang yang
                                                                     timbul
                                                               berdasarkan
                                            1.555.122.769.0 Perjanjian Kredit 1.555.122.769.0
                                                                                                 51      %
                                                   48       Fasilitas Bergulir       48
                                                            US$60.000.000,
                   Obligasi                                      Perjanjian
               Berkelanjutan IV                                Lindung Nilai
     IPO                        05 Desember
               Merdeka Copper                                 ING Bank dan
Obligasi/Sukuk                      2022
                Gold Tahap I                                     Perjanjian
                 Tahun 2022                                    Lindung Nilai
                                                                 HSBC, dan
                                                                modal kerja
                                                            Sekitar 6% akan
                                                             digunakan oleh
                                                                 MAP untuk
                                                                 menunjang
                                                                  kegiatan
                                                              pembangunan
                                                                infrastruktur
                                            197.027.029.72                     197.027.029.72
                                                            bypass road dan                       6      %
                                                   1                                 1
                                                              persiapannya,
                                                                 yang akan
                                                            menyambungkan
                                                                 jalan trans
                                                            Sulawesi dengan
                                                               Proyek Emas
                                                                      Pani
                                                            Sekitar 8% akan
                                                             digunakan oleh
                                                                 BTR untuk
                                                                 menunjang
                                            245.364.600.00 kebutuhan modal 245.364.600.00
                                                                                                  8      %
                                                   0            kerja dalam          0
                                                                    rangka
                                                                mendukung
                                                             kegiatan usaha
                                                                      BTR
Page 4
  Jenis
            Kode Nama
Penawaran               Tanggal Efektif                           Rencana List
               Efek
  Umum
                                               Hasil
                                             Realisasi                       Jumlah
                                              Bersih         Uraian       (satuan mata    Persentase
                                           (satuan mata                       uang)
                                               uang)
                                                         Sekitar 4% akan
                                                          digunakan oleh
                                                            BKP untuk
                                                            menunjang
                                          121.312.149.23 kebutuhan modal 121.312.149.23
                                                                                            4      %
                                                0           kerja dalam        0
                                                              rangka
                                                            mendukung
                                                          kegiatan usaha
                                                                BKP
Page 5
Rincian Realisasi Penawaran Umum

    Jenis
                Kode Nama
  Penawaran                   Tanggal Efektif   Realisasi List
                   Efek
    Umum
Page 6
   Jenis
                 Kode Nama
 Penawaran                     Tanggal Efektif                         Realisasi List
                    Efek
   Umum
                                                     Hasil
                                                   Realisasi                       Jumlah
                                                    Bersih        Uraian        (satuan mata    Persentase
                                                 (satuan mata                       uang)
                                                     uang)
                                                               Sekitar 31%
                                                             akan digunakan
                                                             oleh Perseroan
                                                             untuk melunasi
                                                                   Obligasi
                                            959.000.000.00 Berkelanjutan III 959.000.000.00
                                                                                                 31      %
                                                   0          Tahap I Seri A         0
                                                                   sebesar
                                                             Rp959.000 juta
                                                             yang akan jatuh
                                                               tempo pada
                                                            tanggal 15 Maret
                                                               Sekitar 51%
                                                             akan digunakan
                                                              oleh BSI untuk
                                                                  mendanai
                                                               pembayaran
                                                                 utang yang
                                                                     timbul
                                                               berdasarkan
                                            1.590.587.634.3 Perjanjian Kredit 1.590.587.634.3
                                                                                                 51      %
                                                   98       Fasilitas Bergulir       98
                                                            US$60.000.000,
                   Obligasi
                                                                 Perjanjian
               Berkelanjutan IV
     IPO                        05 Desember                    Lindung Nilai
               Merdeka Copper
Obligasi/Sukuk                      2022                      ING Bank dan
                Gold Tahap I
                                                                 Perjanjian
                 Tahun 2022
                                                               Lindung Nilai
                                                                 HSBC, dan
                                                                modal kerja
                                                            Sekitar 6% akan
                                                             digunakan oleh
                                                                 MAP untuk
                                                                 menunjang
                                                                  kegiatan
                                                              pembangunan
                                                                infrastruktur
                                            161.562.164.37                     161.562.164.37
                                                            bypass road dan                       6      %
                                                   1                                 1
                                                              persiapannya,
                                                                 yang akan
                                                            menyambungkan
                                                                 jalan trans
                                                            Sulawesi dengan
                                                               Proyek Emas
                                                                      Pani
                                                            Sekitar 8% akan
                                                             digunakan oleh
                                                                 BTR untuk
                                                                 menunjang
                                            245.364.600.00 kebutuhan modal 245.364.600.00
                                                                                                  8      %
                                                   0            kerja dalam          0
                                                                    rangka
                                                                mendukung
                                                             kegiatan usaha
                                                                      BTR
Page 7
    Jenis
                   Kode Nama
  Penawaran                       Tanggal Efektif                             Realisasi List
                      Efek
    Umum
                                                         Hasil
                                                       Realisasi                           Jumlah
                                                        Bersih           Uraian         (satuan mata       Persentase
                                                     (satuan mata                           uang)
                                                         uang)
                                                                   Sekitar 4% akan
                                                                    digunakan oleh
                                                                      BKP untuk
                                                                      menunjang
                                                    121.312.149.23 kebutuhan modal 121.312.149.23
                                                                                                             4        %
                                                          0           kerja dalam        0
                                                                        rangka
                                                                      mendukung
                                                                    kegiatan usaha
                                                                          BKP

Rincian Biaya Penawaran Umum

    Jenis                                              Jumlah                                     Jumlah
                                       Tanggal                                                              Persenta
  Penawaran         Kode Efek                           Hasil                Uraian            (Satuan Mata
                                        Efektif                                                                se
    Umum                                              Penawaran                                    Uang)
     IPO           Obligasi         05 Desember 3.100.555.000. a. biaya jasa penjaminan
Obligasi/Sukuk Berkelanjutan IV         2022         000       (underwriting fee);
                                                                                                775.138.750      0,025    %
               Merdeka Copper
                Gold Tahap I
                 Tahun 2022                                         b. biaya jasa
                                                                    penyelenggaraan
                                                                                               13.952.497.500    0,45     %
                                                                    (management fee);

                                                                    c. biaya jasa penjualan
                                                                    (selling fee);
                                                                                                775.138.750      0,025    %


                                                                    d. biaya jasa profesi
                                                                    penunjang pasar modal;
                                                                                               4.120.000.000     0,133    %


                                                                    e. biaya jasa lembaga
                                                                    penunjang pasar modal;
                                                                                           2.060.333.000         0,066    %
                                                                    dan

                                                                    f. biaya jasa konsultasi
                                                                    keuangan (financial
                                                                                                       0          0       %
                                                                    advisory fee).

                                                                    g. Biaya lain-lain yang
                                                                    dapat diatribusikan
                                                                                               1.045.344.000     0,034    %
                                                                    langsung sebagai biaya
                                                                    emisi***)

Informasi Lain

Silakan merujuk pada dokumen terlampir untuk informasi yang lebih rinci.




 Demikian untuk diketahui.
Page 8
Hormat Kami,
PT Merdeka Copper Gold Tbk.




Adi Adriansyah Sjoekri

Corporate Secretary




PT Merdeka Copper Gold Tbk.
Treasury Tower, lantai 67, District 8 SCBD Lot. 28 Jl. Jend. Sudirman Kav. 52-53,
Telepon : 021 3952 5580, Fax : 021 3952 5589, www.merdekacoppergold.com



Nama Pengirim                       Adi Adriansyah Sjoekri

Jabatan                             Corporate Secretary
Tanggal dan Waktu                   15-01-2024 16:26

Lampiran                           1. LRPD Obligasi IV Tahap I 2022.pdf


   Dokumen ini merupakan dokumen resmi PT Merdeka Copper Gold Tbk. yang tidak memerlukan tanda tangan
 karena dihasilkan secara elektronik oleh sistem pelaporan elektronik. PT Merdeka Copper Gold Tbk. bertanggung
                          jawab penuh atas informasi yang tertera didalam dokumen ini.
Page 9
Go To Indonesian Page

 Announcement Number                     007/MDKA-JKT/CORSEC/I/2024

 Issuer Name                             PT Merdeka Copper Gold Tbk.

 Issuer Code                             MDKA

 Attachment                              1

 Subject                                 Laporan Penggunaan Dana Hasil Penawaran Umum


Fund received form the public offering            IDR


                                        Amount of                                Plan for use Realized
                                         Proceed      Cost of                     of proceed Use of Fund
   Type of                                                             Net                                  Remaining
                Name of                  from the      Public                   according to according to
    public                 Listing Date                            Realization                               Fund (in
                Issuance                   Public    Offering (in                     the          the
   offering                                                       (in Currency)                             Currency)
                                        Offering (in Currency)                   Prospectus Prospectus
                                        Currency)                               (in Currency) (in Currency)

              Obligasi
            Berkelanjuta
    IPO         n IV
                                             3,100,555,00 22,728,000,0 3,077,827,00 3,077,827,00 3,077,827,00
Obligasi/Suk Merdeka                                                                                                      0
                                                 0,000         00         0,000        0,000        0,000
     uk     Copper Gold
              Tahap I
            Tahun 2022


Allocation of Remaining Fund


 Type of public Name / Code of
                                                                        List of allocation
    offering      Securities

                                   Remaining Fund Interest/Yield                                                Relationship with
                                                                           Allocation        Retention Period
                                    (in Currency)      Rate                                                      the company
                                                                        Saldo bank
                    Obligasi
                                                                       dalam bentuk
                Berkelanjutan IV
      IPO                                                             Giro Rupiah dan
                Merdeka Copper
 Obligasi/Sukuk                                                          USD pada
                 Gold Tahap I                                                         31 Desember
                                              0             6.1     %      HSBC                                    pihak Tiga
                  Tahun 2022                                                              2023
                                                                      Indonesia, UOB
                                                                      Indonesia, BRI,
                                                                        dan Mizuho
                                                                         Indonesia
Page 10
Details of Public Offering Plan


 Type of public Name / Code of
                                  Listing date   List of plans
    offering      Securities
Page 11
Type of public Name / Code of
                                  Listing date                             List of plans
   offering      Securities



                                                 Net Realization                     Amount (in
                                                                    Description                      Percentage
                                                  (in Currency)                      Currency)


                                                                    Sekitar 31%
                                                                  akan digunakan
                                                                  oleh Perseroan
                                                                  untuk melunasi
                                                                        Obligasi
                                                 959,000,000,00 Berkelanjutan III 959,000,000,00
                                                                                                      31      %
                                                        0          Tahap I Seri A         0
                                                                        sebesar
                                                                  Rp959.000 juta
                                                                  yang akan jatuh
                                                                    tempo pada
                                                                 tanggal 15 Maret
                                                                    Sekitar 51%
                                                                  akan digunakan
                                                                   oleh BSI untuk
                                                                       mendanai
                                                                    pembayaran
                                                                      utang yang
                                                                          timbul
                                                                    berdasarkan
                                                 1,555,122,769,0 Perjanjian Kredit 1,555,122,769,0
                                                                                                      51      %
                                                        48       Fasilitas Bergulir       48
                                                                 US$60.000.000,
                   Obligasi                                           Perjanjian
               Berkelanjutan IV                                     Lindung Nilai
     IPO
               Merdeka Copper                                      ING Bank dan
Obligasi/Sukuk
                Gold Tahap I                                          Perjanjian
                 Tahun 2022                                         Lindung Nilai
                                                                      HSBC, dan
                                                                     modal kerja
                                                                 Sekitar 6% akan
                                                                  digunakan oleh
                                                                      MAP untuk
                                                                      menunjang
                                                                       kegiatan
                                                                   pembangunan
                                                                     infrastruktur
                                                 197,027,029,72                     197,027,029,72
                                                                 bypass road dan                       6      %
                                                        1                                 1
                                                                   persiapannya,
                                                                      yang akan
                                                                 menyambungkan
                                                                      jalan trans
                                                                 Sulawesi dengan
                                                                    Proyek Emas
                                                                           Pani
                                                                 Sekitar 8% akan
                                                                  digunakan oleh
                                                                      BTR untuk
                                                                      menunjang
                                                 245,364,600,00 kebutuhan modal 245,364,600,00
                                                                                                       8      %
                                                        0            kerja dalam          0
                                                                         rangka
                                                                     mendukung
                                                                  kegiatan usaha
                                                                           BTR
Page 12
Type of public Name / Code of
                                Listing date                            List of plans
   offering      Securities



                                               Net Realization                    Amount (in
                                                                 Description                   Percentage
                                                (in Currency)                     Currency)


                                                              Sekitar 4% akan
                                                               digunakan oleh
                                                                 BKP untuk
                                                                 menunjang
                                               121,312,149,23 kebutuhan modal 121,312,149,23
                                                                                                 4      %
                                                     0           kerja dalam        0
                                                                   rangka
                                                                 mendukung
                                                               kegiatan usaha
                                                                     BKP
Page 13
Details of Public Offering Realization


 Type of Public Name / Code of
                                     Listing Date   Realization Plan
    Offering      Securities
Page 14
Type of Public Name / Code of
                                  Listing Date                           Realization Plan
   Offering      Securities



                                                 Net Realization                    Amount (in
                                                                    Description                      Percentage
                                                  (in Currency)                     Currency)


                                                                    Sekitar 31%
                                                                  akan digunakan
                                                                  oleh Perseroan
                                                                  untuk melunasi
                                                                        Obligasi
                                                 959,000,000,00 Berkelanjutan III 959,000,000,00
                                                                                                      31      %
                                                        0          Tahap I Seri A         0
                                                                        sebesar
                                                                  Rp959.000 juta
                                                                  yang akan jatuh
                                                                    tempo pada
                                                                 tanggal 15 Maret
                                                                    Sekitar 51%
                                                                  akan digunakan
                                                                   oleh BSI untuk
                                                                       mendanai
                                                                    pembayaran
                                                                      utang yang
                                                                          timbul
                                                                    berdasarkan
                                                 1,590,587,634,3 Perjanjian Kredit 1,590,587,634,3
                                                                                                      51      %
                                                        98       Fasilitas Bergulir       98
                                                                 US$60.000.000,
                   Obligasi                                           Perjanjian
               Berkelanjutan IV                                     Lindung Nilai
     IPO
               Merdeka Copper                                      ING Bank dan
Obligasi/Sukuk
                Gold Tahap I                                          Perjanjian
                 Tahun 2022                                         Lindung Nilai
                                                                      HSBC, dan
                                                                     modal kerja
                                                                 Sekitar 6% akan
                                                                  digunakan oleh
                                                                      MAP untuk
                                                                      menunjang
                                                                       kegiatan
                                                                   pembangunan
                                                                     infrastruktur
                                                 161,562,164,37                     161,562,164,37
                                                                 bypass road dan                       6      %
                                                        1                                 1
                                                                   persiapannya,
                                                                      yang akan
                                                                 menyambungkan
                                                                      jalan trans
                                                                 Sulawesi dengan
                                                                    Proyek Emas
                                                                           Pani
                                                                 Sekitar 8% akan
                                                                  digunakan oleh
                                                                      BTR untuk
                                                                      menunjang
                                                 245,364,600,00 kebutuhan modal 245,364,600,00
                                                                                                       8      %
                                                        0            kerja dalam          0
                                                                         rangka
                                                                     mendukung
                                                                  kegiatan usaha
                                                                           BTR
Page 15
 Type of Public Name / Code of
                                     Listing Date                               Realization Plan
    Offering      Securities



                                                     Net Realization                        Amount (in
                                                                         Description                          Percentage
                                                      (in Currency)                         Currency)


                                                                    Sekitar 4% akan
                                                                     digunakan oleh
                                                                       BKP untuk
                                                                       menunjang
                                                     121,312,149,23 kebutuhan modal 121,312,149,23
                                                                                                                   4        %
                                                           0           kerja dalam        0
                                                                         rangka
                                                                       mendukung
                                                                     kegiatan usaha
                                                                           BKP

Details of Cost of Public Offering

                                                        Amount of
Type of Public                                                                                        Amount (in       Percenta
                  Securities Code     Listing Date    Proceed for the      Description
   Offering                                                                                           Currency)           ge
                                                      Public Offering
     IPO           Obligasi                           3,100,555,000, a. Underwriting fee
Obligasi/Sukuk Berkelanjutan IV                            000
                                                                                                     775,138,750 0.025            %
               Merdeka Copper
                Gold Tahap I
                 Tahun 2022                                            b. Management fee
                                                                                                    13,952,497,5000.45            %


                                                                       c. Selling fee
                                                                                                     775,138,750 0.025            %


                                                                       d. Capital Market
                                                                       Supporting Profession
                                                                                                    4,120,000,000 0.133           %
                                                                       fee

                                                                       e. Capital Market
                                                                       Supporting Institution fee
                                                                                                    2,060,333,000 0.066           %


                                                                       f. Financial advisory fee
                                                                                                          0            0          %


                                                                       g. Other fees which can
                                                                       be directly attributed as
                                                                                                 1,045,344,000 0.034              %
                                                                       securities issuance fees


Other Information

Please refer to the attached document for more detailed information.




Thus to be informed accordingly.
Page 16
Respectfully,
PT Merdeka Copper Gold Tbk.




Adi Adriansyah Sjoekri

Corporate Secretary




PT Merdeka Copper Gold Tbk.
Treasury Tower, lantai 67, District 8 SCBD Lot. 28 Jl. Jend. Sudirman Kav. 52-53,
Phone : 021 3952 5580, Fax : 021 3952 5589, www.merdekacoppergold.com



Sender Name                         Adi Adriansyah Sjoekri

Function                            Corporate Secretary

Date and Time                       15-01-2024 16:26

Attachment                         1. LRPD Obligasi IV Tahap I 2022.pdf


 This is an official document of PT Merdeka Copper Gold Tbk. that does not require a signature as it was generated
     electronically by the electronic reporting system. PT Merdeka Copper Gold Tbk. is fully responsible for the
                                      information contained within this document.

File

File Open PDF
Source IDX
Size0.04 MB
Published15 Jan 2024
Pages16
Characters43,206
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 2 people and organisations named in the text · linked when the evidence is strong

linked person Adi Adriansyah Sjoekri · Corporate Secretary p.8 ×5
possible org Merdeka Copper Gold Tbk. · Nama Perusahaan p.1 ×32

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result