Page 1
Exploration Report – Quarter 1 2026
Introduction
During the period 1st of January to 31st of March 2026 (Q1 2026), PT Amman Mineral Nusa
Tenggara (PT AMNT), a subsidiary of PT Amman Mineral Internasional Tbk (PT AMI),
carried out exploration activities within IUPK Blocks II (Elang) and Block III (Rinti) located
in Sumbawa, Indonesia (Figure 1). There was no field exploration activity within Block I
(Batu Hijau) and Blok IV (Lampui).
Total exploration expenditure for Q1 2026 was approximately USD $ 3.06 M.
Figure 1. PT AMNT IUPK blocks, Sumbawa, Indonesia.
1
Page 2
Batu Hijau Block I
No exploration field work or costs incurred in Q1 2026.
Forward Plan:
• Exploration drilling program at West Nangka (1 rig), for 2 holes or 1200 m.
2
Page 3
Elang Block II
Expenditure:
• Exploration activities included drilling and geological mapping. Costs were circa
USD $ 2.75 M.
Work Areas:
• Elang Cu-Au Project.
• Gerbang East Cu-Au Project.
• Elang North-East.
Exploration Parties:
• Manager - AMNT Exploration.
• Drilling contractor - PT Minera Nusa Drillindo (PT MND).
• Assay Laboratory (drill core, rock) - Intertek Utama Service (ITS).
Assessment Methods:
• Diamond drilling (3 rigs).
• Geological mapping.
• Alteration analyses using an ASD TerraSpec 4 Mineral Spectrometer.
Objectives:
• Resource development drilling continued at the Elang Cu-Au deposit (Figure 2).
The purpose of this infill program was to address data gaps, refine the geological
model, and enhance the confidence level of mineral resource classifications.
• The exploration drilling program in the Gerbang East area is designed to evaluate
the mineralization potential and to obtain sufficient geological and grade data to
support the classification of mineral resources within the newly discovered Cu-Au
deposit in the region.
• Geological mapping at Elang Northeast. The objective is to guide exploration
toward the most prospective zones, thereby enabling precise drill-hole targeting.
Exploration Results:
• Elang Cu-Au project diamond drilling (7 holes for 3,863.5 m):
o Resource infill, Elang - 3 holes (1,789.8 m) completed or in progress,
o Exploration drilling, Gerbang East - 4 holes (2,073.7 m) completed or in
progress.
• Core samples submitted to the assay lab amounted to 1,463.
• The geological mapping program covered an area of 88.7 ha at Elang Northeast.
Forward Plan:
• Continue resource drilling at Elang and exploration drilling at Gerbang East (2 rigs).
• Exploration drilling at Sebu East (1 rig), 2 holes or 2000 m
1
Page 4
Figure 2. Elang Block II Q1 2026 – Exploration Locations.
2
Page 5
Rinti Block III
Expenditure:
• Exploration activities included drilling and geological mapping. Costs were circa
USD $307 K
Work Areas:
• Rinti Cu-Au Project.
Exploration Parties:
• Manager - AMNT Exploration.
• Drilling contractor - PT Minera Nusa Drillindo (PT MND).
• Assay Laboratory (drill core, rock) - Intertek Utama Service (ITS).
Assessment Methods:
• Diamond drilling (1 rig).
• Geological mapping.
• Alteration analyses using an ASD TerraSpec 4 Mineral Spectrometer.
Objective:
• Exploration drilling at Rinti is targeting the Cu-Au porphyry mineralisation potential
below a lithocap in SW Sane and Bekolar. (Figure 3).
• The objective of geological mapping is to reconfirm the extent and boundaries of
alteration and mineralization around the SW Sane and Bekolar lithocap system.
Exploration Result:
• Exploration drilling - 2 holes (1,283.7 m) completed or in progress.
• Core samples submitted to the assay lab amounted to 480.
• The geological mapping program covered an area of 16.9 ha at Bekolar.
Forward Plan:
• Exploration drilling (1 rig); upon completion, the rig will be allocated to Sebu East
(Elang Block).
3
Page 6
Figure 3. Rinti Block III Q1 2026 – Exploration Locations.
4
Page 7
Lampui Block IV
No exploration field work or costs incurred in Q1 2026.
Forward Plan:
• Review of previous exploration results
5
Names mentioned 7 people and organisations named in the text · linked when the evidence is strong
unresolved
org
PT Amman Mineral Nusa Tenggara
p.1
unresolved
org
PT AMNT
p.1
unresolved
org
PT AMI
p.1
unresolved
org
PT AMNT IUPK
p.1
unresolved
org
PT Minera Nusa Drillindo
p.3 ×2
unresolved
org
PT MND
p.3 ×2
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
No extraction attempted yet.