Page 1
Exploration Report – Quarter 4 2023
Introduction
During the period 1st October 2023 to 31st December 2023 (Q4 2023), PT Amman Mineral Nusa
Tenggara (PT AMNT), a subsidiary of PT Amman Mineral Internasional (PT AMI), carried out
exploration activities on IUPK Blocks I, II and III, located in Sumbawa, Indonesia (Figure 1). There was
no field exploration at Block IV, Lampui.
Total exploration expenditure for Q4 2023 was approximately USD $ 6.27 M.
Figure 1. PT AMNT IUPK blocks, Sumbawa, Indonesia.
Batu Hijau Block I
Expenditure:
• In pit resource drilling program costs (including core sample assay costs) amounted to
approximately USD $ 3.12 M.
Work areas:
• Batu Hijau Cu-Au mine.
Exploration parties:
• Manager - AMNT Mine Technical Service (MTS).
• Drilling contractor - PT Minera Nusa Drillindo (PT MND).
• Assay laboratory - Intertek Utama Service (ITS).
PT Amman Mineral Internasional Tbk.
Menara Karya 6th Level Jalan H.R. Rasuna Said Blok X-5 Kav. 1-2 Jakarta 12950
T +6221 25546700 F +6221 5794 4592
Page 2
• Umpire assay laboratory - PT Geoservices.
Assessment methods:
• Diamond coring (11 drill rigs).
Objectives:
• The aim of the on-going drill program is to improve the confidence classifications of resources
below the Batu Hijau Phase-8 pit design.
Exploration Results:
• 29 drill holes, completed or in progress, totaling 12,507.6 m (Figure 2).
• Core samples submitted to the assay lab amounted to 4,311.
• The Batu Hijau Mineral Resource Estimate (MRE) was updated.
Forward Plan:
• The resource drilling program (12 rigs) will continue in Q1 2024.
Figure 2. Batu Hijau Block I Q4 2023 – In Pit Drill Collar Locations.
PT Amman Mineral Internasional Tbk.
Menara Karya 6th Level Jalan H.R. Rasuna Said Blok X-5 Kav. 1-2 Jakarta 12950
T +6221 25546700 F +6221 5794 4592
Page 3
Elang Block II
Expenditure:
• Exploration activities included drilling and geological mapping. Costs were circa USD $ 2.68 M.
Work Areas:
• Elang Cu-Au Project
• Alma Cu-Au Project
• Sebu East Project.
Exploration Parties:
• Manager - AMNT Exploration.
• Drilling contractor - PT Minera Nusa Drillindo (PT MND).
• Assay Laboratory (drill core, rock) - Intertek Utama Service (ITS).
Assessment Methods:
• Diamond drilling (3 rigs).
• Geological mapping (including rock sampling).
• Alteration analyses using an ASD Terra Search 4 Mineral Spectrometer.
Objectives:
• Resource development drilling continued at the Elang Cu-Au deposit (Figure 3). The purpose
of this infill program was to explore information gaps, improve the geological model and
increase the confidence level of resource classifications.
• Exploration drilling at Alma tested for potential Cu-Au porphyry mineralization beneath a
lithocap (Figure 3). Detailed geological mapping was also undertaken.
• Detailed geological mapping at Sebu East over a significant IP conductivity and resistivity
anomaly (Figure 3).
Exploration Results:
• Elang Block diamond drilling (21 holes for 3,688.8 m):
o Elang Cu-Au resource infill – 17 holes, completed or in progress, totaling 2,227.8 m.
o Alma Cu-Au exploration – 4 holes, completed or in progress, amounting to 1,461.0 m.
• Core samples submitted to the assay lab amounted to 1,373.
• Geological mapping program:
o Sebu East - 63 rock samples were submitted to the lab.
o Alma - 49 rock samples were submitted to the lab.
• The Elang Mineral Resource Estimate (MRE) was updated.
Forward Plan:
• Elang resource definition diamond drilling (2 rigs) will continue in Q1 2024.
• Alma exploration diamond drilling (1 rig) will continue in Q1 2024.
PT Amman Mineral Internasional Tbk.
Menara Karya 6th Level Jalan H.R. Rasuna Said Blok X-5 Kav. 1-2 Jakarta 12950
T +6221 25546700 F +6221 5794 4592
Page 4
Figure 3. Elang Block II Q4 2023 - Exploration Locations.
PT Amman Mineral Internasional Tbk.
Menara Karya 6th Level Jalan H.R. Rasuna Said Blok X-5 Kav. 1-2 Jakarta 12950
T +6221 25546700 F +6221 5794 4592
Page 5
Rinti Block III
Expenditure:
• Exploration drilling program and geological mapping costs (including core sample and rock
assay costs) amounted to approximately USD $ 0.46 M
Work Areas:
• Rinti Cu-Au Project.
Exploration Parties:
• Manager - AMNT Exploration.
• Drilling contractor - PT Minera Nusa Drillindo (PT MND).
• Assay Laboratory (rocks) - Intertek Utama Service (ITS).
Assessment Method:
• Diamond drilling (1 rig).
• Geological mapping (including rock sampling).
Objectives:
• The aim of the current exploration drilling program is to test for potential Cu-Au porphyry
mineralization beneath a lithocap (Figure 4).
• Detailed geological mapping was carried out over a significant Cu-Au soil anomaly in the NW
corner of the Rinti Block (Figure 4).
Exploration Results:
• Rinti diamond drilling – 2 holes, completed or in progress, amounting to 699.9 m.
• Core samples submitted to the assay lab amounted to 220.
• Geological mapping program - 110 rock samples were submitted to the lab.
Forward Plan:
• The exploration drilling program (1 rig) will continue in Q1 2024.
PT Amman Mineral Internasional Tbk.
Menara Karya 6th Level Jalan H.R. Rasuna Said Blok X-5 Kav. 1-2 Jakarta 12950
T +6221 25546700 F +6221 5794 4592
Page 6
Figure 4. Rinti Block III Q4 2023 - Exploration Locations.
PT Amman Mineral Internasional Tbk.
Menara Karya 6th Level Jalan H.R. Rasuna Said Blok X-5 Kav. 1-2 Jakarta 12950
T +6221 25546700 F +6221 5794 4592
Page 7
Lampui Block IV
No field activities completed or planned. No costs incurred in Q4 2023. Desktop review of previous
exploration results will continue in Q1 2024.
PT Amman Mineral Internasional Tbk.
Menara Karya 6th Level Jalan H.R. Rasuna Said Blok X-5 Kav. 1-2 Jakarta 12950
T +6221 25546700 F +6221 5794 4592
Names mentioned 8 people and organisations named in the text · linked when the evidence is strong
unresolved
org
PT Amman Mineral Nusa Tenggara
p.1
unresolved
org
PT AMNT
p.1
unresolved
org
PT AMI
p.1
unresolved
org
PT AMNT IUPK
p.1
unresolved
org
PT Minera Nusa Drillindo
p.1 ×3
unresolved
org
PT MND
p.1 ×3
unresolved
org
PT Geoservices. Assessment
p.2
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
No extraction attempted yet.