(SP BRM PT Bumi Resources Minerals Tbk. Bakrie Tower, 6 & 10" Floor Komplek Rasuna Epicentrum JI H.R. Rasuna Said, Kuningan Jakarta Selatan 12940 Indonesia T 462 21 5794 5698 F 162 215794 5687 www.bumiresourcesminerals.com LAPORAN TENTANG AKTIVITAS EKSPLORASI OLEH ANAK PERUSAHAAN PT BUMI RESOURCES MINERALS TBK. (REPORT ON EXPLORATION ACTIVITIES BY SUBSIDIARIES OF PT BUMI RESOURCES MINERALS TBK.) PT Citra Palu Minerals Nama Perusahaan (Name of Company) Tahap Kegiatan KK (Phase of Activity of Contract of Work) Laporan Eksplorasi Periode (Period of Exploration Report) PT Citra Palu Minerals (“PT CPM") Operasi Produksi (Production Operation) Oktober - Desember (October - December) 2023 Daerah Eksplorasi Exploration Areas 1. Blok I, Sulawesi Tengah (Operasi Produksi) 2. Blok Il, Sulawesi Selatan (Eksplorasi) 3. Blok IV, Sulawesi Tengah (Eksplorasi) 4. Blok V, Sulawesi Tengah (Eksplorasi) 5. Blok VI, Sulawesi Tengah (Eksplorasi) 1. Block I, Central Sulawesi (Production Operation) Block Il, South Sulawesi (Exploration) Block IV, Central Sulawesi (Exploration) Block V, Central Sulawesi (Exploration) SN &» N Block VI, Central Sulawesi (Exploration) Biaya Eksplorasi Exploration Cost 768.185,38 Dollar AS USD768, 185.38 Bentuk Kegiatan Eksplorasi Form of Exploration Activities 1. Melanjutkan kegiatan pengeboran sumberdaya di Prospek River Reef, Blok I Poboya, dengan total kedalaman saat ini yaitu sebesar 50.576,2 meter. 2. Melanjutkan kegiatan pengeboran sumberdaya di area Watu Putih, Blok I Poboya, dengan total kedalaman hingga saat ini yaitu sebesar 9.984,35 meter. 3. Melanjutkan kegiatan pengeboran eksplorasi di area Prospek Hill Reef 2, Blok I Poboya, dengan total kedalaman hingga saat ini yaitu sebesar 2.378,1 meter. 4. Melanjutkan kegiatan pemetaan geologi di Area Malomba, Ogowele, Anggasan, dan Taanes, Blok IV, dengan total 223 sampel batuan dan 755 sampel tanah. 5. Melakukan pengiriman sampel inti bor untuk analisis geokimia (Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Hg dan kombinasi Au # ICP OES multi elemen) 1. Continuing resource drilling activities in the River Reef Prospect, Block I Poboya, with current total depth of 50,576.2 meters. 2. Continuing resource drilling activities in the Watu Putih area, Block 1 Poboya, with current total depth of 9,984.35 meters. 3. Continuing exploration drilling activities in the Hill Reef 2 Prospect area, Block I Poboya, with current total depth of 2,378. 1 meters. 4. Continue geological mapping activities in the Malomba, Ogowele, Anggasan and Taanes Areas, Block IV, with a total of 223 rock samples and 755 soil samples. 5. Sending drill core samples for geochemical analysis (Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Hg and a combination of multi-element Au 4 ICP OES) and vw?
Page 2 OCR 0.886
(SP BRM dan analisis AAT (Air Asam Tambang). ke Laboratorium PT Geoservices. AAT (Add Mine Water) analysis. to the PT Geoservices Laboratory. 6. Melakukan pengiriman sampel inti bor untuk uji | & Sending drill core samples for geotechnical testing geoteknik ke Laboratorium Geomekanika dan to the Geomechanics and Mining Eguioment Peralatan Tambang, Institut Teknologi Bandung Laboratory, Bandung Institute of Technology (ITB). (TB) 7. Melakukan pengiriman sampel inti bor domain | Z. Send domain drill core samples for metallurgical untuk uji metalurgi ke Laboratorium PT Indo testing to the PT Indo Mineral Research Mineral Research. Laboratory. Pihak-Pihak yang Terlibat Involved Parties 1 Laboratorium PT CPM 1. Internal PT CPM Laboratory 2. PT Sumagud Sapta Sinar 2. PT Sumagud Sapta Sinar 3. Laboratorium PT Geoservices 3. PT Geoservices Laboratory 4. Bureau Varitas — PT IOL Indonesia 4. Bureau Varitas — PT IOL Indonesia 5. PT Pos Indonesia 5. PT Pos Indonesia 6. PT Intertek Utama Service 6. PT Intertek Utama Service 7. Laboratorium Geomekanika dan Peralatan | 7 /TB Laboratory of Geomechanics and Mine Tambang ITB Eguioment 8. PT Indo Mineral Research 8. PT Indo Mineral Research Metode Pengujian dan Pemilihan Areal Testing Method and Selection Area 1. AAS 1. AAS 2. Specific Gravity 2. Specific Gravity 3. Fire Assay 3. Fire Assay 4. Agua Regia Digest 4. Agua Regia Digest 5. Hg Analisis 5. Hg Analysis 6. ICP OES 42 unsur 6. ICP OES 42 elements 7. Natural density, dry density, saturated density, | 7. Natural density, dry density, saturated density, Brazillian test, direct shear, ultrasonic velocity, Brazillian test, direct shear, ultrasonic velocity, UCS UCS 8. Analisis Air Asam Tambang ARD Test 9. Uji Physical Properties (PP), Uji Uniaxial| 9 Physical — Properties — Test (PP), Uniaxial Compressive Strength (UCS), Uji Triaxial Compressive Strength (UCS) Test, Triaxial Test 10. Pengujian kominusi (Abrasion Index, BRMI, SMC, | 70. Comminution Test (Abrasion Index BRMI, SMC, JKBMM): Head Grade, Sianidasi: Column Test JKBMM): Head Grade, Sianidasi: Column Test
Page 3 OCR 0.932
(SP BRM Kemajuan Eksplorasi Terhadap Kegiatan Triwulan Sebelumnya Exploration Progress towards the Preceding Guarter's Activities 1. Pengeboran sumberdaya di Prospek River Reef dilakukan dengan menggunakan 5 rig. Total 234 titik bor, termasuk 3 titik bor hidrogeologi dan 5 titik bor geotek, dengan total kedalaman 50.576,2 meter sampai akhir Desember 2023. Terdapat penambahan 14 titik bor dengan jumlah kedalaman 5.129,8 meter dari periode sebelumnya. 2. Pengeboran sumberdaya di Prospek Watu Putih dilanjutkan dengan menggunakan 2 rig. Total 28 titik bor dengan total kedalaman 9.984,35 meter sampai akhir Desember 2023. Terdapat penambahan 3 titik bor dengan jumlah kedalaman 860,1 meter dari periode sebelumnya 3. Pengeboran eksplorasi di Prospek Hill Reef 2 dilanjutkan dengan menggunakan 1 rig. Total 15 titik bor dengan total kedalaman 2.378,1 m sampai akhir Desember 2023. Terdapat penambahan 1 titik bor dengan jumlah kedalaman 259,7 meter dari periode sebelumnya 4. Penambahan jumlah sampel sebanyak 2.309 sampel hasil pengeboran Prospek River Reef Blok I Poboya yang dikirim ke Laboratorium PT Geoservices untuk dianalisis geokimia (Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Hg dan kombinasi Au 4 ICP OES 42 unsur), 17 sampel untuk analisis AAT (Air Asam Tambang). 5. Penambahan jumlah sampel sebanyak 1.190 sampel hasil pengeboran Prospek Watu Putih Blok I Poboya yang dikirim ke Laboratorium PT Geoservices untuk dianalisis geokimia (Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Hg dan kombinasi Au 4 ICP OES 42 unsur dan 1 sampel untuk analisis air asam tambang. 6. Total penambahan sebanyak 92 sampel batuan dan 326 sampel tanah berasal dari kegiatan pemetaan geologi di Area Anggasan dan Malomba, Blok IV. 1. Resources drilling program in Poboya River Reef Prospect Block I was conducted using 5 rigs. A Total of 234 drill holes, included 3 hydrogeology holes and 5 geotech holes, with total depth of 50,576.2 meters has been achieved by the end Of December 2023. There are 14 additional drill holes with total depth of 5,1298 meters from previous period. 2. Resources drilling program in Watu Putih Prospect was continued using 2 rig. A total of 28 drill holes with total depth of 9,984.35 meters has been achieved by the end of December 2023. There are additional 3 drill holes with total depth of 860.1 meters from previous period. 3. Exploration drilling program in Hill Reef 2 Prospect was continued using 1 rig. A total of 15 (fifteen) drill holes with total depth of 2378 1 m has been achieved by the end of December 2023. There are additional 1 drill holes with total depth of 259.7 meters from previous period, 4. Additional 2,309 drill core samples from River Reef Prospect of Block 1 Poboya drilling program have been sent to PT Geoservices Laboratory to be analyzed (Au, Ag, u, Pb, Zn, As, Sb, Mo, Hg and combination Au # ICP OES 42 elements), 17 samples for ARD (Acid Rock Drainage). 5. Additional 1,190 drill core samples from Watu Putih Prospect of Block I Poboya drilling program have been sent to PT Geoservices Laboratory to be analyzed (Au, Ag, u, Pb, Zn, As, Sb, Mo, Hg and combination Au # ICP OES 42 elements) and 1 sample for ARD (Acid Rock Drainage). 6. Total additional 92 rock samples and 326 soil samples collected from geological mapping activity at Anggasan dan Malomba Areas, Block IV. pd
Page 4 OCR 0.747
(SP BRM Hasil kegiatan pengeboran PT CPM telah berhasil — meningkatkan sumberdaya — dan cadangan di Prospek River Reef dan Hill Reef 1 serta berhasil mendefinisikan sumberdaya dan cadangan di Prospek Watuputih. Total sumberdaya dan cadangan di Blok | Poboya ditampilkan pada tabel di bawah ini. CA Drilling program carried out by PT CPM has been successfully increase resource and reserve particularly in River Reef and Hill Reef 1 Poboya and ako define resource and reserve in Watuputih Prospect as shown in table below. Taanes dan Tinabogan di Blok IV. Pepe on pal peran Ia aan Daan men ea mma Dee Tem aa ee ma EA Me PA | Banetaan aa Panai run mop aa aa AAA | arora Tiesto 4g aa Tineson aa Tssiapeo| ta . aa L Laga, aa Taresasoo| 26 56 (nsm3o0|7.es5.co0| E Tamesapoo| 26 5g Jssnoxoo7essan0) ea MEA TAI 2 ba em Peer aer Tera KN PIrBpmuncera) Open pit Ta 2 Pa EP ra Jonatarea 5 aa Daya 2 ra I Ta Tausutarl esa Inner b Inap aa 26 Iromonharsa! G. | Rencana Selanjutnya Next Plan 1. Melanjutkan kegiatan pengeboran di Prospek | 7. Continue resources drilling program in River Reef River Reef, Blok I Poboya dengan tujuan untuk Prospect of Block 1 Poboya Prospect with menambah sumberdaya di Prospek River Reef. Objectives to increase resources in River Reef Prospect. 2. Melanjutkan kegiatan pengeboran di Prospek | 2. Continue resources drilling program in Watu Putih, Blok | Poboya dengan tujuan untuk Watuputih Prospect of Block 1 Poboya Prospect meningkatkan sumberdaya dan cadangan di with the objective of resources definition in Prospek Watuputih. Watuputih Prospect. 3. Melanjutkan kegiatan pengeboran eksplorasi di | 3. Continue exploration drilling program in Hill Reef Prospek Hill Reef 1, Blok I Poboya dengan tujuan 1 Prospect of Block I Poboya Prospect with the untuk mengetahui potensi bijih kadar rendah Objective is to test the potential of low grade ore pada kedalaman dangkal. at shallow level. 4. Melanjutkan pemetaan geologi detail di Area | 4 Continue geological detailed mapping at Taanes and Tinabogan Area, Block IV. H. | Hambatan Eksplorasi Barriers to Exploration 1 2 Kegiatan penambangan tanpa izin (PETI) oleh masyarakat sekitar. Pembebasan lahan. 1 2. land acguisition. Megal mining activities by locals.
Page 5 OCR 0.913
(SP BRM Perizinan/ Persetujuan Baru Yang Diperoleh New Permits/Approvals Acguired 1. Keputusan Menteri Lingkungan Hidup dan Kehutanan Republik Indonesia Nomor SK.11359/Menlhk-PDASRH/KTA/DAS.1/10/2023 tentang Penetapan Lokasi Penanaman Dalam Rangka Rehabilitasi Daerah Aliran Sungai Atas Nama PT Citra Palu Minerals tanggal 23 Oktober 2023 Surat Direktorat Jenderal Mineral dan Batubara Nomor B-1839/MB.04/DBM.PE/2023 tentang Persetujuan Tekno Ekonomi Revisi Laporan Studi Kelayakan Kontrak Karya PT Citra Palu Minerals tanggal 31 Oktober 2023. Keputusan Menteri Lingkungan Hidup dan Kehutanan Republik Indonesia Nomor SK.1294/MENLHK/SETJEN/PLA.4/12/2023 tentang Kelayakan Lingkungan Hidup Rencana Kegiatan Penambangan dan Pengolahan Emas di Blok I Poboya Kecamatan Mantikulore, Kota Palu, Provinsi Sulawesi Tengah oleh PT Citra Palu Minerals tanggal 6 Desember 2023. z Decree of the Minister of Environment and Forestry of the Republic of Indonesia Number SK.11359/Menlhk-PDASRH/KTA/DAS. 1/10/2023 concerning Determination of Planting Locations for the Rehabilitation of River Watersheds in the Name of PT Citra Palu Minerals dated on October 23” 2023. Letter from the Directorate General of Mineral and Coal Number B-1839/MB.04/DBM.PE/2023 regarding Techno-fconomic Approval of the Revision of the Feasibility Study Report for the PT Citra Palu Minerals Work Contract dated on October 3F" 2023. Decree of the Minister of Environment and Forestry of the Republic of Indonesia Number SK. 1294/MENL HK/SETJENYPLA.4/12/2023 regarding the Environmental Feasibility of Gold Mining and Processing Activity Plans in Block 1 Poboya, Mantikulore District, Palu City, Central Sulawesi Province by PT Citra Palu Minerals dated on December 6" 2023.
Page 6 OCR 0.914
(SP BRM
PT Dairi Prima Mineral
Nama Perusahaan
(Name of Company
Tahap Kegiatan KK
(Phase of Activity of Contract of Work)
Laporan Eksplorasi Periode
(Period of Exploration Report)
PT Dairi Prima Mineral ("PT DPM")
Operasi Produksi (Production Operation)
Oktober - Desember (October - December) 2023
A. | Daerah Eksplorasi Exploration Areas
Kegiatan eksplorasi pada Prospek Anjing Hitam | Exoloration activities in Anjing Hitam Prospect
sudah selesai dilakukan dan saat ini prospek | have already been completed. The prospect
tersebut memasuki tahap Operasi Produksi. currentiy is in Production Operation stage.
Selain Prospek Anjing Hitam, di dalam wilayah | Besides Anjing Hitam Prospect, there are some
Kontrak Karya PT DPM masih terdapat prospek- | other prospect areas within PT DPM'$ Contract of
prospek lainnya dengan tahap kegiatan yang | Work tenement. The prospects” work progresses
berbeda-beda dari eksplorasi regional hingga | are in different stages, ranging from regional
pengeboran deliniasi sumberdaya. exploration to delineation resource drilling.
Salah satu prospek yang paling maju | Lae Jehe Prospect is the most advantageous
pengerjaannya adalah Prospek Lae Jehe yang | exoloration — prospect, which is located
terletak sekitar 200 meter di sebelah barat laut | approximately 200 meters toward northwest from
Prospek Anjing Hitam. Prospek ini sudah | Anjing Hitam Prospect. This prospect work stage is
memasuki tahap pengeboran deliniasi | in resource delineation drilling and will be
sumberdaya dan masih akan dikembangkan | developed to get final mineral resource value with
hingga didapatkan sumber daya mineral | dominant measured and indicated mineral
dengan klasifikasi terukur dan tertunjuk yang | resources classification.
lebih dominan.
B. | Biaya Eksplorasi Exploration Cost
29.181,54 Dollar AS USD29, 181.54
C. | Bentuk Kegiatan Eksplorasi Form of Exploration Activities
Validasi data geoteknik dari inti bor yang sudah | Validation of geotechnical data from existing drill
ada cores.
D. | Pihak-Pihak yang Terlibat Involved Parties
Tim Internal PT DPM Internal Team of PT DPM
E. | Metode Pengujian dan Pemilihan Areal Testing Method and Selection of Area
F. | Kemajuan Eksplorasi Terhadap Kegiatan | Exploration Progress relative to Preceding
Triwulan Sebelumnya Guarter's Activities
G. | Rencana Pengeboran Selanjutnya Nex Drilling Plan
Page 7 OCR 0.874
(SP BRM Hambatan Eksplorasi Barriers to Exploration Perizinan/Persetujuan Baru Yang Diperoleh New Permits/Approvals Acguired
Page 8 OCR 0.878
(SP BRM PT Gorontalo Minerals Nama Perusahaan (Name of Company) Tahap Kegiatan KK (Phase of Activity of Contract of Work) Laporan Eksplorasi Periode (Period of Exploration Repord PT Gorontalo Minerals (“PT GM”) Operasi Produksi (Production Operation) Oktober - Desember (October - December) 2023 A. | Daerah Eksplorasi Exploration Areas 1. Prospek Sungai Mak, Blok I (Tombulilato), | 7. Sungai Mak Prospect, Block 1 (Tombulllato), Gorontalo Gorontalo 2. Prospek Motomboto North, Blok 2. Motomboto North Prospect, Block 1 (Tombulilato), Gorontalo (Tombulilato), Gorontalo 3. Prospek Motomboto East, Blok 1/3 Motomboto East Prospect, Block 1 (Tombulilato), Gorontalo (Tombulilato), Gorontalo 4. Prospek Kayubulan, Blok 1 (Tombulilato), | 4 Kayubulan Prospect, Block 1 (Tombulilato), Gorontalo Gorontalo B. | Biaya Eksplorasi Exploration Cost 136.434,64 Dollar AS USD 136, 434.64 C. | Bentuk Kegiatan Eksplorasi Form of Exploration Activities 1 Melanjutkan analisis 19 sampel petrografi dan 18 sampel mineragrafi dari Prospek Motomboto North, Blok | Tombulilato di Laboratorium LAPI-TB Bandung. Melakukan pengiriman sampel pengeboran Prospek Motomboto East, Blok | Tombulilato sebanyak total 11.073 conto inti bor ke Laboratorium PT Geoservices untuk analisis geokimia. Melakukan pengiriman sampel untuk pengujian geoteknik batch kedua sebanyak 102 sampel batuan dari Prospek Motomboto East, Blok | Tombulilato ke Laboratorium Geomekanika ITB. Melakukan pengujian metalurgi column test untuk Domain Oxide dari Prospek Motomboto North, Prospek Motomboto East, dan Prospek Sungai Mak, Blok I Tombulilato di Laboratorium PT Geoservices di bawah pengawasan Metso-Outotec. 1. Continuing analysis of 19 petrography samples and 18 mineragraphy samples from Motomboto North Prospect of Block 1 Tombulilato in LAP-TB' Laboratory. Sending a total of 11,073 core samples from Motomboto East Prospect of Block 1 Tombulilato to PT Geoservices' Laboratory for geochemical analysis. Sending samples for the second batch of geotechnical testing which consist of 102 rock samples from Motomboto East Prospect of Block 1 Tombulilato to Geomechanics Laboratory of ITB. Conducting metallurgical column test for Oxide Domain from Motomboto North Prospect, Motomboto East Prospect, and Sungai Mak Prospect of Block I Tombulilato in PT Geoservices' Laboratory under Metso- Outotec's supervision.
Page 9 OCR 0.895
(SP BRM 5. Melanjutkan pemetaan geologi dan | 5. Continuing geological mapping and taking pengambilan sampel batuan permukaan di surface rock samples around the Sungai Mak sekitar area Prospek Sungai Mak dan Prospect and Kayubulan Prospect, Block 1 Prospek Kayubulan, Blok 1 Tombulilato Tombulilato areas, totaling 724 samples, and sebanyak 724 sampel, serta sampel telah the samples have been sent to the PT dikirim ke Laboratorium PT Geoservices Geoservices Laboratory for geochemical untuk analisis geokimia. analysis. 6. Melakukan kegiatan ridge spur soil | 6. Carried out ridge spur soil sampling activities sampling sebanyak 311 sampel pada totaling 311 samples at Sungai Mak Prospect, Prospek Sungai Mak, Blok | Tombulilato. Block I Tombulllato. 7. Melakukan interpretasi dan pemodelan | 7. Carried out geological interpretation and geologi untuk Prospek Motomboto North modeling for the Motomboto North Prospect dan Prospek Motomboto East, Blok I and Motomboto East Prospect, Block 1 Tombulilato untuk estimasi sumberdaya Tombulilato to estimate mineral resources and dan cadangan mineral. reserves. Pihak-Pihak yang Terlibat Involved Parties 1. Laboratorium PT Geoservices 1. PT Geoservices' Laboratory 2. Laboratorium Geomekanika ITB 2. ITB Geomechanics' Laboratory 3. Laboratorium Teknik Lingkungan ITENAS 3. ITENAS Environmental Engineering Laboratory 4. PT Adiprotek Envirodunia 4. PT Adiprotek Envirodunia 5. PT ITS Tekno Sains 5. PT ITS Tekno Sains 6. PT LAPI ITB 6. PT LAPI ITB 7. Laboratorium PT Indo Mineral Research 7. PT Indo Mineral Research's Laboratory Metode Pengujian dan Pemilihan Areal Testing Method and Selection of Area Kemajuan Triwulan Sebelumnya Eksplorasi Terhadap Kegiatan Exploration Progress toward Previous Guarter's Activities 1. Penambahan jumlah sampel sebanyak 721 sampel dari hasil pengeboran pada Prospek Motomboto East, Blok I Tombulilato yang dikirim ke Laboratorium Geoservices untuk dianalisis. Penambahan jumlah sampel batuan permukaan sebanyak 403 sampel dari area di sekitar Prospek Sungai Mak dan Prospek Kayubulan, Blok | Tombulilato: 1. Adding a total of 721 samples from the drilling of Motomboto East Prospect of Block I Tombulilato's, which have been sent to PT Geoservices' Laboratory for further analysis. Adding a total af 403 surface rock samples from the area around Sungai Mak Prospect and Kayubulan Prospect of Block 1 Tombulilato.
Page 10 OCR 0.893
(SP BRM Izin (PETI) baru di area sepanjang jalur bukaan jalan perintis. 3. Menyelesaikan pengujian dan studi Air | 3. ' Completing Acid Mine Drainage testing and Asam Tambang sebanyak 29 sampel dari study of 29 samples from Motomboto East Prospek Motomboto East, Blok 1 Prospect of Block 1 Tombulilato in ITENAS Tombulilato di Laboratorium — Teknik Environmental Engineering Laboratory. Lingkungan ITENAS. 4. Menyelesaikan analisis dan pengujian | 4 Completing metallurgical analysis and testing metalurgi untuk Domain Supergen pada for Supergene Domain of Sungai Mak Prospek Sungai Mak, Blok I Tombulilato di Prospect of Block 1 Tombulilato at PT Laboratorium PT Geoservices dan Indo Geoservices' laboratory and Indo Mineral Mineral Research Laboratorium. Research Laboratory. 5. Menyelesaikan batch pertama pengujian | 5. 'Completing the first batch of geotechnical geoteknik sebanyak 52 sampel batuan testing consist of 52 rock samples of untuk Prospek Motomboto East, Blok | Motomboto East Prospect of Block 1 Tombulilato di Laboratorium Geomekanika Tombulilato in ITB Geomechanics' Laboratory. ITB. Rencana Selanjutnya Next Plan 1. Melanjutkan kegiatan pemetaan geologi | 7. Continuing geological mapping and surface dan pengambilan sampel — batuan rock sampling activities in the area of permukaan di area Prospek Kayubulan, Blok Kayubulan Prospect, Block I Tombulilato. | Tombulilato. 2. Melakukan kegiatan ridge spur soil 2 Conducting ridge spur soil sampling activities sampling pada Prospek Kayubulan, Blok I at Kayubulan Prospect, Block 1 Tombulilato. Tombulilato. 3. Melakukan pengiriman soil sample dari | 3. Sending soil samples from Sungai Mak Prospek Sungai Mak, Blok I Tombulilato ke Prospect of Block 1 Tombulilato to PT Laboratorium PT Geoservices untuk analisis Geoservices” laboratory for geochemichal geokimia analysis. 4. Melakukan estimasi sumberdaya dan | 4 Conducting resource and reserve estimation cadangan mineral untuk Prospek for Motomboto East Prospect and Motomboto Motomboto East dan Motomboto North, North Prospect, as well as the Oxide Domain serta Domain Oxide dari Prospek Sungai of Sungai Mak Prospect. Mak Hambatan Eksplorasi Barriers to Exploration 1. Adanya aktivitas Penambangan Tanpa Izin | 1. An Illegal Mining Activity (PETI) in the drilling (PETI) di area rencana pengeboran Prospek planned area of Motomboto Complex of Motomboto, Blok I Tombulilato. Block I Tombulilato. 2. Munculnya aktivitas Penambangan Tanpa | 2. New Illegal Mining Activity (PETI) in the opening area alongside the pioneering road construction. Perizinan/Persetujuan Baru Yang Diperoleh New Permits/Approvals Acguired
Page 11 OCR 0.920
(SP BRM
IV. PT Linge Mineral Resources
Nama Perusahaan
(Name of Company)
Tahap Kegiatan IUP
(Phase of Activity of Mining Permit
Laporan Eksplorasi Periode
(Period of Exploration Report)
PT Linge Mineral Resources ("PT LMR")
Eksplorasi (Exploration)
Oktober - Desember (October - December) 2023
Daerah Eksplorasi
Exploration Areas
1. Prospek Bulan (Proyek Abong)
2. Prospek Bintang 1 (Proyek Abong)
3. Prospek Bintang 2 (Proyek Abong)
1. Bulan Prospect (Abong Project)
2. Bintang 1 Prospect (Abong Project)
3. Bintang 2 Prospect (Abong Project)
Biaya Eksplorasi
Exploration Cost
390.344 Dollar AS
USD390,344
Bentuk Kegiatan Eksplorasi
Form of Exploration Activities
regional).
2. PT LMR telah melaksanakan
publik — tambahan — rencana
1. Pada periode ini, PT LMR melanjutkan
kegiatan eksplorasi di lapangan berupa
survei regional geologi (stream sediment
sampling, rock sampling dan pemetaan
kegiatan
geological surveys (stream sediment,
sampling and regional mapping).
konsultasi | 2. PT LMR has carried out additional public
consultations on plans for DMP gold ore
1. In this period, PT LMR continue exploration
activities in the field in the form of regional
penambangan dan pengolahan bijih emas
DMP pada tanggal 30 September - 1
Oktober 2023 di Desa Owag, Desa Lumut,
Desa Ise-Ise, Kabupaten Aceh Tengah.
3. Pada tanggal 13 Desember 2023, PT LMR
telah rnenyampaikan Perbaikan Adendum
Studi Kelayakan yang disesuaikan dengan
Berita Acara Pembahasan Studi Kelayakan
tanggal 1 November 2023. Adendum Studi
Kelayakan ini disusun sehubungan dengan
adanya perubahan metode pengelolaan dari
wet tailing menjadi dry tailing.
4. Pada periode ini, PT LMR melanjutkan proses
penyelesaian studi AMDAL serta
permohonan Persetujuan Teknis Pengelolaan
Limbah B3 untuk Kegiatan Penimbunan
Limbah B3 kepada Kementerian Lingkungan
Hidup dan Kehutanan.
mining and processing activities on September
30” -October 1“ 2023 in Owag Village, Lumut
Village, Ise-Ise Village, Central Aceh Regency.
On December 13" 2023, PT LMR submitted a
revised Feasibility Study Addendum which was
adjusted to the Feasibility Study Minutes of
Meeting dated November 1 2023. This
Feasibility Study Adodendum was prepared in
connection with the change from wet tailing to
dry tailing.
. During this period, PT LMR continue process of
completing an AMDAL study and in the process
of applying Hazardous and Toxic Waste
Management Technical Approval for the
Stockpilling of Hazardous and Toxic Waste to
the Ministry of Environment and Forestry.
IN
Page 12 OCR 0.915
(PP BRM Pihak-Pihak yang Terlibat Involved Parties PT Bahtera Ratu Engineering PT Bahtera Ratu Engineering Metode Pengujian dan Pemilihan Areal Testing Method and Selection of Area pengambilan sampel endapan sungai di blok-blok lain di luar Prospek Abong yaitu Owag, Serule, Simpil, dan Penarun. AMDAL AMDAL Kemajuan Eksplorasi Terhadap Kegiatan | Exploration Progress toward Previous Guarter's Triwulan Sebelumnya Activities 1. Pada periode ini, kegiatan regiona/| 1. In this period, PT LMR regional mapping mapping — telah dilakukan dengan activities have carred out stream sediment sampling in outside the Abong Prospect, consists of Owag, Serule, Simpil, and Penarun. blok-blok lain di luar Prospek Abong yaitu Owag, Serule, Simpil, dan Penarun. 2. Pada tanggal 28 Oktober 2023, PT LMR| 2. On October 28" 2023, PT LMR received the telah menerima Hasil Penapisan Otomatis Automatic Screening Results of the Amdalnet Sistem Informasi Dokumen Lingkungan Environmental Document Information System Hidup Amdalnet untuk Rencana Usaha for Business Plans and/or DMP Gold Ore dan/atau Kegiatan Penambangan dan Mining and Processing Activities at the Abong Pengolahan Bijih Emas DMP di Proyek Project from the Ministry of Environment and Abong dari Kementerian Lingkungan Hidup Forestry. dan Kehutanan. 3. Pada tanggal 27 November 2023, PT LMR | 3. On November 27" 2023, PT LMR received the telah menerima Hasil Uji Administrasi Amdalnet Administration Test Results for the Amdalnet untuk Kerangka Acuan Rencana Terms of Reference for DMP Gold Ore Mining Usaha dan/atau Kegiatan Penambangan and Processing Business Plans and/or Activities dan Pengolahan Bijih Emas DMP di Proyek at the Abong Project from the Ministry of Abong dari Kementerian Lingkungan Hidup Environment and Forestry. dan Kehutanan. 4. Pada tanggal 30 November 2023, PT LMR | 4. On November 30” 2023, PT LMR has fulfilled memenuhi undangan dari Kementerian the invitation from the Ministry of Lingkungan Hidup dan Kehutanan untuk Environment and Forestry to carry out melaksanakan validasi penilaian Formulir validation of the KA-ANDAL form assessment. KA-ANDAL, sebagai bagian dari proses as part of the AMDAL study completion. penyelesaian studi AMDAL. Rencana Selanjutnya Next Plan 1. Melakukan kegiatan regional mapping di | 1. Conducting regional mapping activities have blok-blok lain di luar Prospek Abong yaitu carried out stream sediment sampling in Pantan Nangka, dan Linge. outside the Abong Prospect, consists of Pantan Nangka and Linge. 2. Melanjutkan kegiatan regional mapping di | 2. Continuing regional mapping activities have carred out stream sediment sampling in outside the Abong Prospect, consists of Owag, Serule, Simpil, and Penarun. PA
Page 13 OCR 0.874
(SP BRM 3. Melanjutkan penyelesaian studi AMDAL dan Persetujuan Teknis Pengelolaan Limbah 3. Continuing the completion of AMDAL study and Technical Approval for B3 Waste B3 dan Baku Mutu Air Limbah. Management and Wastewater Guality Standards. Hambatan Eksplorasi Barriers to Exploration Adanya kegiatan Penambangan Tanpa Izin (PETI) di Prospek Bulan There are Illegal Mining (PETI) activities in Bulan Prospect. Perizinan/Persetujuan Baru Yang Diperoleh New Permits/Approvals Acguired Pa
Page 14 OCR 0.892
(SP BRM
V. PT Suma Heksa Sinergi
Nama Perusahaan PT Suma Heksa Sinergi (“PT SHS")
(Name of Company)
Tahap Kegiatan IUP Operasi Produksi (Production Operation Phase)
(Phase of Activity of Mining Permit)
Laporan Eksplorasi Periode Oktober - Desember (October - December) 2023
(Period of Exploration Report)
A. | Daerah Eksplorasi Exploration Area
Prospek Cisadang Central Cisagang Central Prospect
B. | Biaya Eksplorasi Exploration Cost
3.221.921.631 Rupiah 1DR3,221,921,631
C. | Bentuk Kegiatan Eksplorasi Form of Exploration Activities
1. Melanjutkan kegiatan pemetaan geologi di | 7. Continuing geological mapping activities in
Prospek Cisadang Central. the Cisadang Central Prospect.
2. Melanjutkan kegiatan rekonstruksi core| 2. Gontinuing — core drilling reconstruction
pengeboran. activities.
3. Melakukan kegiatan pengeboran di| 3 Conducting drilling activities at the Cisadang
Prospek Cisadang Central untuk studi Central Prospect for metallurgical and
metalurgi dan geoteknik. geotechnical studies.
4. Melanjutkan kerjasama dengan konsultan | 4 Continuing to collaborate with consultant for
untuk cadangan JORC. JORC Reserve.
5. Melanjutkan proses pengurusan terkait | 5 Continuing the Approvak-to-Use of Forest
permohonan Persetujuan Penggunaan Area ("PPKH") application process for further
Kawasan Hutan (“PPKH") untuk eksplorasi exploration.
lanjutan.
D. | Pihak-Pihak yang Terlibat Involved Parties
1. PT Namsuma Luban Abadi 1. PT Namsuma Luban Abadi
2. AMC Consultants Pty. Ltd. 2. AMC Consultants Pty. Ltd.
3. PT COMO Engineers Indonesia 3. PT COMO Engineers
4. CV Aruntara Konstruksi 4. CV Aruntara Konstruksi
5. PT Anugrah Jaya Pabrikasi 5. PT Anugrah Jaya Pabrikasi
6. Koperasi Produsen Limantaka 6. Koperasi Produsen Limantaka
7. PT Asahi Diamond Industrial Indonesia 7. PT Asahi Diamond Industrial Indonesia
8. CV Dwimitra Syneray 8. CV Dwimitra Synergy
9. PT Haluan Baru Energi 9. PT Haluan Baru Energi
10. PT Tera Widyagama
10. PT Tera Widyagama
hk
Page 15 OCR 0.911
(SS BRM
Metode Pengujian dan Pemilihan Areal
Testing Method and Selection of Area
Kemajuan Eksplorasi Terhadap Kegiatan
Triwulan Sebelumnya
Exploration Progress toward Previous Guarters
Activities
1.
Kegiatan rekonstruksi core pengeboran
telah diselesaikan sebanyak 88 lubang bor
dari total 205 lubang bor.
Kemajuan pemetaan geologi di Prospek
Cisadang Central sudah mencapai 404.
Pengeboran untuk studi metalurgi sudah
dimulai pada tanggal 6 Oktober 2023 dan
sudah terealisasi 4 titik lubang bor (1004),
dengan total kedalaman 900 meter per
Desember 2023.
Kemajuan aktivitas pengeboran geoteknik
di Prospek Cisadang Central mencakup
proses penyelesaian 1 titik lubang bor
dengan kedalaman pengeboran yang telah
mencapai 59,10 meter dari total rencana 4
titik lubang bor dengan kedalaman
pengeboran 800 meter.
1. Drilling core reconstruction activities have
been completed in 88 drill holes of 205 total
drill holes.
2. Geological mapping progress in Cisadang
Central Prospect has reached the completion
level of 405.
3. Drilling for metallurgical study has been
started on October 6", 2023 and already
finished 4 drill holes (10096), with total depth
of 900 meters as of December 2023.
4. The progress of geotechnical drilling in the
Cisadang Central Prospect included the
process of completing 1 drill hole with drilling
depth that has reached 59.10 meters of a
total of 4 planned drill holes with a drilling
depth of 800 meters.
Rencana Selanjutnya
Next Plan
8,
ta
Melanjutkan pemetaan geologi di Prospek
Cisadang Central
Melanjutkan kegiatan pengeboran di
Prospek Cisadang Central untuk studi
geoteknik dan hidrogeologi
Melanjutkan rekonstruksi core pengeboran.
1. Continuing geological mapping at Cisadang
Central
2. Continuing drilling activities at the Cisadang
Central Prospect for geotechnical and
hydrogeological studies.
3. Continuing of core drilling reconstruction.
Hambatan Eksplorasi
Barriers to Exploration
1.
Perizinan terkait Persetujuan Penggunaan
Kawasan Hutan ("PPKH”) untuk eksplorasi
lanjutan masih dalam proses pengurusan.
2. Keberadaan lokasi IUP PT SHS berada di
dekat area pemukiman masyarakat.
1. Permit related to Approval-to-Use of Forest
Area (“PPKH”) for further exploration is still
being processed.
2. The IUP location of PT SHS is near the
community residential area.
Perizinan/Persetujuan Baru Yang Diperoleh
New Permits/Approvals Acguired
Names mentioned 0 people and organisations named in the text · linked when the evidence is strong
The name pass has not read this document yet.
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
No extraction attempted yet.