                       No: 0002/ARCHI/1/2024/G




EXPLORATION REPORT
PT Archi Indonesia Tbk.
  31th December 2023
Page 2
                                                                            No: 0002/ARCHI/1/2024/G
PT Archi Indonesia Tbk. (the ”Company” or “ARCI”) owns 100% of the Toka Tindung Gold
Mine, a pure-play gold mine located approximately 35 kilometers northeast of the regional
capital, Manado, in North Sulawesi, Indonesia, through the Company’s wholly-owned
subsidiaries, PT Meares Soputan Mining (“MSM”) and PT Tambang Tondano Nusajaya
(“TTN”).
The Toka Tindung Gold Mine consists of two long-term Contract of Works (“CoWs”) covering
39,817 hectares, which cover into two administration areas in North Sulawesi, North Minahasa
and Bitung City districts (Figure 1). The CoWs are valid until 2041 and are held by MSM and
TTN. Pursuant to the Mining Law Amendment, MSM and TTN have been guaranteed two
more extensions of the CoWs in the form of Special Mining Business License/Izin Usaha
Pertambangan Khusus (“IUPK”), each for maximum period of 10 years.




                 Figure 1. Map Location of MSM and TTN’s Contract of Works



Exploration activities carried out by the Company, through its subsidiaries, which are MSM
and TTN, for the period January 2023 to December 2023 were focused on mapping in the
Greenfield area and semi detail to detail mapping in the Brownfield area of the Western
Corridor Project. The semi detail mapping and geophysics CSAMT also conducted in the
Brownfield area of the Eastern Corridor Project. Exploration drilling activities and Gold
Resource Definition drilling in Western Corridor Project and also Exploration drilling in Eastern
Corridor Project as presented in the map below (Figure 2).
Page 3
                                                                           No: 0002/ARCHI/1/2024/G
Below are the details of Exploration activities costs for the period January 2023 to December
2023:

      Total Exploration activities costs for the period January 2023 were US$634,084 or
       equivalent to Rp9.5 billion.
      Total Exploration activities costs for the period February 2023 were US$529,113 or
       equivalent to Rp8.1 billion.
      Total Exploration activities costs for the period March 2023 were US$693,085 or
       equivalent to Rp10.4 billion.
      Total Exploration activities costs for the period April 2023 were US$754,416 or
       equivalent to Rp11.1 billion.
      Total Exploration activities costs for the period May 2023 were US$732,189 or
       equivalent to Rp11.0 billion.
      Total Exploration activities costs for the period June 2023 were US$666,046 or
       equivalent to Rp10.0 billion.
      Total Exploration activities costs for the period July 2023 were US$543,955 or
       equivalent to Rp8.2 billion.
      Total Exploration activities costs for the period August 2023 were US$526,095 or
       equivalent to Rp8.0 billion.
      Total Exploration activities costs for the period September 2023 were US$617,293 or
       equivalent to Rp9.6 billion.
      Total Exploration activities costs for the period October 2023 were US$645,875 or
       equivalent to Rp10.3 billion.
      Total Exploration activities costs for the period November 2023 were US$666,448 or
       equivalent to Rp10.3 billion.
      Total Exploration activities costs for the period December 2023 were US$790,374 or
       equivalent to Rp12.2 billion.


Therefore, the total Exploration activities cost for the period January 2023 to December 2023
US$7,798,973 or equivalent to around Rp118.6 billion.
Meanwhile, the details of drilling activities for the period January 2023 to December 2023 were
as follow:

      On January 2023, ARCI had conducted drilling at 26 holes with a total depth of 5,508.6
       meters.
      On February 2023, ARCI had conducted drilling at 42 holes with a total depth of
       4,561.3 meters.
      On March 2023, ARCI had conducted drilling at 11 holes with a total depth of
       2,581.1meters.
      On April 2023, ARCI had conducted drilling at 11 holes with a total depth of 2,851.6
       meters.
      On May 2023, ARCI had conducted drilling at 16 holes with a total depth of 3,991.6
       meters.
      On June 2023, ARCI had conducted drilling at 10 holes with a total depth of 2,140.0
       meters.
Page 4
                                                                              No: 0002/ARCHI/1/2024/G
       On July 2023, ARCI had conducted drilling at 16 holes with a total depth of 3,762.4
        meters.
       On August 2023, ARCI had conducted drilling at 12 holes with a total depth of 3,208.2
        meters.
       On September 2023, ARCI had conducted drilling at 13 holes with a total depth of
        3,607.2 meters.
       On October 2023, ARCI had conducted drilling at 15 holes with a total depth of 4,497.0
        meters.
       On November 2023, ARCI had conducted drilling at 15 holes with a total depth of
        3,859.2 meters.
       On December 2023, ARCI had conducted drilling at 18 holes with a total depth of
        5,262.1 meters.
Therefore, the total drilling activities conducted for the period January 2023 to December 2023
were around 205 holes and 45,830.3 meters.
Drilling activities for gold Resource Definition and Exploration, involved Diamond Drilling
(“DD”) and Reverse Circulation (“RC”) drilling methods, were performed by PT Maxidrill
Indonesia through a contract/agreement. Details of number of drill programs by project and by
month, quarter- and half-yearly reporting period by drilling method are shown in Table 1.
Table 1. 2023 Monthly, Quarterly and Half-yearly drilling statistics by prospect and drill type.



                                        Diamond Drilling (DD)        Reverse Circulation (RC)
                       Prospect
       Period                          Number of     Drilling        Number of      Drilling
                         Area
                                       Drill Holes    Meters         Drill Holes    Meters
                     Blambangan              5        1,341.1             13        2,164.0
  January 2023       Toka                    1         195.0               2         277.0
                     Wesco                   5        1,531.5              -            -
                     Sub Total              11        3,067.6             15        2,441.0
                     Toka                    3         299.6              34        2,916.0
  February 2023      Wesco                   5        1,345.7              -            -
                     Sub Total               8        1,645.3             34        2,916.0
                     Toka                    3         662.7               -            -
   March 2023        Marawuwung              1         432.3               -            -
                     Wesco                   7        1,486.1              -            -
                     Sub Total              11        2.581.1              -            -
    Q1 TOTAL                                30        7,294.0             49        5,357.0
Page 5
                                                             No: 0002/ARCHI/1/2024/G



                            Diamond Drilling (DD)   Reverse Circulation (RC)
               Prospect
  Period                   Number of     Drilling   Number of      Drilling
                 Area
                           Drill Holes    Meters    Drill Holes    Meters
              Marawuwung         4         737.2          -            -
 April 2023   Wesco              5        1,269.3         -            -
              Wiau               2         845.1          -            -
              Sub Total         11        2,851.6         -            -
              Blambangan         3         690.3          -            -
              Marawuwung         3         919.2          -            -
 May 2023     Wesco              6        1,327.1         -            -
              Wiau               4        1,055.0
              Sub Total         16        3,991.6        -                -
              Blambangan         4         791.9         -                -
June 2023     Wesco              4        1,138.8        -                -
              Wiau               2         209.3         -                -
              Sub Total         10        2,140.0        -                -
Q2 TOTAL                        37        8,983.2
              Blambangan       7        1,229.0          -                -
              Marawuwung       4        1,414.3          -                -
 July 2023    Wesco            4          937.7          -                -
              Toka             1          181.4          -                -
              Sub Total       16        3,762.4          -                -
              Toka             1          47.9           -                -
August 2023   Marawuwung       5        1,846.20         -                -
              Wesco            6        1,314.1          -                -
              Sub Total       12        3,208.2          -                -
September     Marawuwung       6        2,305.0          -                -
              Wesco            7        1,302.2          -                -
   2023
              Sub Total       13        3,607.2          -                -
Q3 TOTAL                      41        10,577.8         -                -
Page 6
                                                                        No: 0002/ARCHI/1/2024/G



                                  Diamond Drilling (DD)       Reverse Circulation (RC)
                  Prospect
   Period                        Number of     Drilling       Number of      Drilling
                    Area
                                 Drill Holes    Meters        Drill Holes    Meters
                Marawuwung            10        3,206.0
October 2023    Wesco                  5        1,291.0
                Sub Total             15        4,497.0             -                -
                Marawuwung            10        2,737.0
November 2023   Wesco                  5        1,122.2
                Sub Total             15        3,859.2             -               -
                Toka                   -           -                1             182.0
December 2023   Marawuwung            12        3,935.5             -               -
                Wesco                  5        1,144.6             -               -
                Sub Total             17        5,080.1             1             182.0
 Q4 TOTAL                             47       13,436.3             1             182.0
 YTD 2023                            155       40,291.3            50            5,539.0




    Figure 2. Map of drilling progress for the period January 2023 to December 2023

File

File Open PDF
Source IDX
Size0.91 MB
Published10 Jan 2024
Pages6
Characters10,920
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 0 people and organisations named in the text · linked when the evidence is strong

The name pass has not read this document yet.

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result