Skip to content
Back to announcement

20231219_SQMI_Public Expose_31560898_lamp1.pdf

Other Text extracted SQMI

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 17

Page 1
PUBLIC EXPOSE
  22 December 2023




                     1
Page 2
BUSINESS OVERVIEW
Tinjauan Bisnis




                    2
Page 3
                                    GROUP STRUCTURE
                                    Struktur Grup Usaha
               Wilton Resources Corporation Limited
                                    (Listed in SGX, Stock Code 5F7)
                                                        100%

                          Wilton Resources Holdings Pte. Ltd.
                                             (Singapore)
                      68,66%                                                    100%

PT. Wilton Makmur Indonesia Tbk.                               Wilton Assets Management Ltd
     (Listed in IDX, Stock Code SQMI)                                      (Malaysia)

                      99%

     PT. Wilton Investment                                            Mr Wijaya Lawrence
               (Indonesia)                            1%

                      99%

  PT. Wilton Wahana Indonesia
               (Indonesia)                             1%                          Operation Production Mining Licence (IUP OP)
                                                                                        Holders of two Concession Blocks
                      99%                                                           Pemegang 2 Konsensi IUP Operasi-Produksi
                                                                                             (“Ciemas Gold Project”)
      PT. Liektucha Ciemas
               (Indonesia)                             1%
Page 4
MINING PERMITS and CLEAR & CLEAN CERTIFICATIONS
Ijin Usaha Pertambangan dan Sertifikat Clear & Clean

Items             PT. Wilton Wahana Indonesia (“PT. WWI”)                                   Clear & Clean Certification – PT. WWI
IUP No.           503.8/7797-bppt/2011
Issued To         PT Witon Wahana Indonesia
Issued By         Integrated Licensing Services Board Administration of Sukabumi District
Issue Date        5 October 2011
Expiry Date1      7 September 2030
Area (km2)        28.785 km2
Permit Type       Exploration, mining, construction, production, transportation, and sale



Items             PT. Liektucha Ciemas (“PT. LTC”)
                                                                                            Clear & Clean Certification – PT. LTC
IUP no.           503.8/3106-bppt/2012
Issued to         PT Liektucha Ciemas
Issued by         Integrated Licensing Services Board Administration of Sukabumi District
Issue date        8 May 2012
Expiry date1      4 January 2028
Area (km2)        2.00 km2
Permit Type       Exploration, mining, construction, production, transportation, and sale


1 Can be extended two times (twice) pursuant to Mining Law No.4 of 2009.
Page 5
                  BOARD OF COMMISSIONERS
                      Dewan Komisaris




 Mr. Wijaya Lawrence                    Mr. Mohammad Raylan
President Commisioner                 Independent Commisioner
   Komisaris Utama                       Komisaris Independen
Page 6
                           BOARD OF DIRECTORS
                                 Direksi




Mr. Oktavia Budi Raharjo      Mr. Andrianto D. Lawrence   Mr. Chia Wei Yang (Ethan)
   President Director                  Director                    Director
     Direktur Utama                    Direktur                    Direktur
Page 7
                          SUPPORTING PROFESSIONALS
                              Profesi Penunjang



• Corporate Sponsor of Wilton Resources Corporation Limited (SGX: 5F7) – ZICO Capital Pte Ltd



• External Auditors – Ernst & Young



• Singapore Company Secretary - InCorp, Singapore Legal – SLB, Indonesian Legal – Dentons HPRP



• Indonesian Share Custodians – UOB Kay Hian Sekuritas, NH Korindo Sekuritas, Valbury Sekuritas
Page 8
               SUPPORTING TECHNICAL PROFESSIONALS
                     Profesi Penunjang Teknis



•   Resources & Reserves (IQPR; compliance to JORC 2012)




• Valuations




• Technical Design & Processing Plant Manufacturer
Page 9
FINANCIAL OVERVIEW
Tinjauan Keuangan




                     9
Page 10
Interim Consolidated Statement of Financial position
Laporan Posisi Keuangan Konsolidasian Interim
Page 11
Interim Consolidated Statement of Financial position
Laporan Posisi Keuangan Konsolidasian Interim
Page 12
Interim Consolidated Statement of Profit or Loss
Laporan Laba Rugi Konsolidasian Interim
Page 13
PROGRESS OF
CIEMAS GOLD PROJECT
Perkembangan
Ciemas Gold Project




                      13
Page 14
MASTER PLAN OF THE 500 TPD FLOTATION AND CARBON IN LEACH PRODUCTION PLANT
(UPGRADABLE TO 1,500 TPD)
Rencana Induk Fasilitas Produksi Floatation and Carbon in Leach berkapasitas 500 tpd
(Dapat ditingkatkan menjadi 1.500 tpd)
                                                                                       Legend for the 500 tpd flotation & CIL plant

                                                                                           1      Raw Ore Stock Pile
                                                                                           2      Raw Ore Bin
                                                                                           3      Crushing
                                                                                           4      Conveyor Belt
                                                                                           5      Screening
                                                                                           6      Fine ore bin
                                                                                           7      Grinding
                                                                                           8      Flotation
                                                                                           9      Thickener flotation concentrate
                                                                                           10     Flotation concentrate filter pressing
                                                                                           11     Thickerner Flotation tailings
                                                                                           12     Flotation tailings filter pressing
                                                                                           13     Leaching
                                                                                           14     Leaching tailings filter pressing, detox
                                                                                           15     Desorption & electro winning
                                                                                           16     Smelting
                                                                                           17     Electrical substation leaching & smelting
                                                                                           18     Air compressor room
                                                                                           19     NaCN warehouse
                                                                                           20     Machine services workshop
                                                                                           21     Laboratory
                                                                                           22     Chemical reagents warehouse
                                                                                           23     Material warehouse
                                                                                           24     Electrical substation crushing & screening
                                                                                           25     Diesel generator
                                                                                           26     Back water pond for grinding, flotation, thickener, and filte
                                                                                           27     Water pump
                                                                                           28     Recycle used water for processing
                                                                                           29     Recycle leaching water
                                                                                           30     Used water pond
                                                                                           31     Electrical substation grinding & flotation
                                                                                           32     Site reserved for grinding
                                                                                           33     Site reserved for flotation
                                                                                           34     Site reserved for thickener flotation tailings
                                                                                           35     Site reserved for flotation tailings filter pressing
                                                                                           36     Site reserved for leaching
                                                                                           37     Site reserved for Leaching tailings filter pressing
                                                                                           38     Site reserved for desorption & electro winning
                                                                                           39     Site reserved for biological or roasting plant
                                                                                           40     Accommodation
                                                                                           41     Pagoda Tower
Page 15
KEY UPDATES
Perkembangan
Utama




               15
Page 16
    KEY UPDATES
    Perkembangan Utama
Key Updates on the Progress:                                          Perkembangan Utama terkait Progress:
   The completion of the Trial Production is by end-January 2023.       Penyelesaian Trial Production pada akhir Januari 2023.
   Appointment & Service Engagements of Mining Specialists              Penunjukkan & Kontrak Kerja Ahli Pertambangan
       Ir. Wiku Padmonobo, FAusIMM, as Senior Specialist in                  Ir. Wiku Padmonobo,FAusIMM, sebagai Senior Specialist in
        Mineral Processing and Metallurgical Engineering,                      Mineral Processing and Metallurgical Engineering,
       Ir. Agus Panca, MT, a Mining Engineer & Mining                        Ir. Agus Panca, MT, Mining Engineer & Mining
        Environmental Specialist,                                              Environmental Specialist,


Operational Update:                                                   Operational Update:
       The Group’s mining operations has achieved its target                Operasi penambangan Grup telah mencapai target tingkat
        mining rate of 15,000 tonnes per month. The operating pit             penambangan sebesar 15.000 ton per bulan. Desain pit
        design has enabled selective mining which resulted in                 operasi memungkinkan penambangan yang selektif sehingga
        increased efficiency and reduced mining costs;                        meningkatkan efisiensi dan mengurangi biaya penambangan;
       The Group’s Processing Facility is currently being operated          Fasilitas Pemrosesan Grup saat ini dioperasikan 24 jam.
        on a 24-hour basis. The current operations is at 300 tonnes           Operasional saat ini mencapai 300 ton per hari dengan
        per day with a recoverability rate ranging between 60% to             tingkat pemulihan berkisar antara 60% hingga 80%; dan
        80%; and                                                             Pada bulan November 2023, Grup telah memproduksi 7.713
       In November 2023, the Group produced 7,713 grams of                   gram Gold Dore dan 17.333 gram Gold Dore berupa
        Gold Dore and 17,333 grams of Gold Dore that is in the                Pregnant Carbon Content yang belum dipisahkan dan dilebur.
        form of Pregnant Carbon Content which has yet to be
        stripped and smelted.
Page 17

          

File

File Open PDF
Source IDX
Size2.63 MB
Published19 Dec 2023
Pages17
Characters12,439
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 0 people and organisations named in the text · linked when the evidence is strong

The name pass has not read this document yet.

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

Other files in this announcement 1

↑↓ select ↵ open ⇧↵ see every result