Skip to content
Back to announcement

20231123_ADRO_Public Expose_31531947_lamp1.pdf

Other Text extracted ADRO

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 42

Page 1
PT Adaro Energy Indonesia Tbk
               Public Expose 2023

            Tuesday, 28 November 2023
Page 2
Disclaimer

These materials have been prepared by PT Adaro Energy Indonesia Tbk (the “Company”) and have not been independently
verified. No representation or warranty, expressed or implied, is made and no reliance should be placed on the accuracy,
fairness or completeness of the information presented or contained in these materials. The Company or any of its affiliates,
advisers or representatives accepts no liability whatsoever for any loss howsoever arising from any information presented or
contained in these materials. The information presented or contained in these materials is subject to change without notice
and its accuracy is not guaranteed.
These materials contain statements that constitute forward-looking statements. These statements include descriptions
regarding the intent, belief or current expectations of the Company or its officers with respect to the consolidated results of
operations and financial condition of the Company. These statements can be recognized by the use of words such as
“expects,” “plan,” “will,” “estimates,” “projects,” “intends,” or words of similar meaning. Such forward-looking statements are not
guarantees of future performance and involve risks and uncertainties, and actual results may differ from those in the forward-
looking statements as a result of various factors and assumptions. The Company has no obligation and does not undertake to
revise forward-looking statements to reflect future events or circumstances.
These materials are for information purposes only and do not constitute or form part of an offer, solicitation or invitation of any
offer to buy or subscribe for any securities of the Company, in any jurisdiction, nor should it or any part of it form the basis of,
or be relied upon in any connection with, any contract, commitment or investment decision whatsoever. Any decision to
purchase or subscribe for any securities of the Company should be made after seeking appropriate professional advice.




                                                                                                                                       2
Page 3
The Adaro Group: Three Business Pillars for a Bigger and
Greener business
Pursuing sustainable growth driven by the green economy




           Stock ticker: ADRO                                    Stock ticker: ADMR

 Main operating pillar: pit-to-power integration to   Growth pillar: metallurgical coal, and minerals      Growth pillar: renewable energy to support
 provide reliable and affordable energy               and minerals processing for green economy            downstream processing and diversification of
                                                                                                           Indonesia’s energy mix
 • Core thermal coal operations in Indonesia          • Metallurgical coal operations in Indonesia
   supported by the group’s mining services and         through PT Adaro Minerals Indonesia Tbk (IDX:      • Developing green energy sources: hydro,
   logistics contractors, and the Adaro Power           ADMR).                                               solar, wind – and continue to actively
   business through PT Adaro Energy Indonesia         • Downstream processing of minerals for EV             participate in tender of renewable power
   Tbk (IDX: ADRO)                                      battery ecosystem in Indonesia through               plants.
 • Provides the cash flows that serve as the            Aluminum facility at Kaltara                       • Supplies the renewable energy requirement
   foundation to fund the Adaro Group’s               • Through this pillar, Adaro Group is committed to     for green downstream processing.
   diversification strategy.                            achieve growth in a more sustainable manner.
Page 4
Snapshot of the Adaro Group



             Production           Sales/Core         FCF/Capex
           FY22: 62.88 Mt          Earnings         FY22: $2.8 bn
          (thermal:met split    FY22: $8.1 bn /       /$424 mn
              94%:6%).             $3.0 bn,         T12M: $3.6 bn
           T12M: 68.23 Mt       T12M: $7.1 bn /       /$620 mn
                                    $3.6 bn




         9M23 Cash of $3.4           ADMR           Adaro Green
                 bn             Investing in met     investing in
           to fund growth      coal and 1.5 Mt of   hydro, solar,
          capex in minerals    aluminum smelter     and wind IPP
             and green
                                                                    4
Page 5
FY23 Guidance
provides cash to invest in EV value chain and renewables

        Sales volume (Mt)                                     Consolidated planned strip ratio (bcm/t)

                                              61.34   62-64
                   59.2                                            5.1
         54.40              54.14                                              4.7
                                     51.58                                                                                 4.2
                                                                                                        4.2
                                                                                           3.8                   3.8




         2018A    2019A     2020A    2021A    2022A   2023F       2018A       2019A       2020A        2021A    2022A     2023F


        Kestrel Saleable MetCoal Production (Mt)              Consolidated capital expenditure ($m)

                   6.8
                             5.7      5.7              6                                                                   400 - 600
                                               5.7
                                                                   496         489
          4.8                                                                                                      424



                                                                                            169          193




         2018A    2019A     2020A   2021A     2022A   2023F       2018A       2019A        2020A        2021A     2022F     2023F*

                                                               *)Exclude expenses related to Kaltara

                                                                                                                                       5
Page 6
Summary of PT Adaro Energy Indonesia Tbk

 Adaro Group Production and Sales                                                                                                            Core Earnings

                    70                                                                                                     70                                     3,500

                    60                                                                                                     60                                     3,000




                                                                                                                                              USD (in millions)
                                                                                                                           50                                     2,500
 Production (Mt)




                    50




                                                                                                                                Sales (Mt)
                    40                                                                                                     40                                     2,000
                    30                                                                                                     30                                     1,500
                    20                                                                                                     20                                     1,000
                    10                                                                                                     10                                      500
                        0                                                                                                  0                                         -
                                        2018          2019           2020          2021          2022          9M23                                                            FY18           FY19          FY20          FY21          FY22           9M23

                                               Tutupan              Wara            Paringin             Balangan                                                                      FY18    FY19       FY20     FY21   FY22      9M23

                                               ADMR                 MIP             Total Sales

   Capital Expenditure                                                                                                                        Adaro Group Coal Sales by Destination in 9M23

                                  600                                                                                                                                          India                                                   Korea
                                                                                                                                                                                12%                                                     7%
                                                                                                                                                                                              Indonesia                    Indonesia
                                  500                                                                                                                                                                                                                  Japan
                                                                                                                                                                   Northeast                     24%                          14%
                                                                                                                                                                                                                                                        33%
                                  400                                                                                                                                Asia
                   USD millions




                                                                                                                                                                     18%
                                  300
                                                                                                                                                                                                                           India
                                                                                                                                                                                                 China                      20%
                                  200
                                                                                                                                                                          Southeast               22%
                                                                                                                                                                            Asia                                                               China
                                  100
                                                                                                                                                                            25%                                                                 26%
                                   -                                                                                                                                       Thermal Coal Sales                                    Metallurgical Coal Sales
                                               FY18          FY19           FY20          FY21          FY22        9M23
                                                                                                                                                                                                                                                               6
Page 7
Summary of PT Adaro Minerals Indonesia Tbk
 Adaro Minerals Key Financial Highlights                                          Adaro Minerals Metcoal Production (Mt)


  OPERATIONAL                             9M23              9M22      Change                                                        3.8 - 4.3
  Production (Mt)                                                                 We expect consistent volume
                                                  3.98         2.56        55%                                         3.4
                                                                                  growth, reaching 6 MT+ in the
  Sales (Mt)                                      3.01         2.19        38%    medium term.
  Overburden removal (Mbcm)                   13.81            6.05       128%                             2.3

  FINANCIAL ($ million)                   9M23              9M22      Change
  Net Revenue                                  721             666         8%            1.0
  Core Earnings                                258             292       -11%
  Operational EBITDA                           359             411       -13%
  Operational EBITDA Margin                   50%             62%        -12%          2020 A            2021 A       2022 A         2023 F



  Sales by Destination 9M23
                                                                                  Adaro Minerals Strip Ratio Remains Very Low

                                  Korea
                                   7%                                            4.0
                      Indonesia                                                  3.5
                         14%                        Japan
                                                     33%                         3.0
                                                                                 2.5
                                                                                 2.0
                     India
                      20%                                                        1.5
                                                                                 1.0
                                          China                                           2020 A          2021 A    2022 A      2023 F
                                           26%

                                                                                                                                                7
Page 8
The World’s Largest Green Industrial Park
Strategically located in North Kalimantan

   •   Located in a very strategic location in terms of export
       & import, and potential supply of mineral sources and
       smelting industries

   •   Total area of 16,000 Ha, consists of 2 (two) large
       overlay area – 11,500 Ha and 4,700 Ha

   •   Potential development of a large-scale public port to
       support the industrial logistics

   •   Huge potential of Hydro Power Plants development
       to power the industrial estate




                                                                 8
Page 9
Aluminium Smelter in Kaltara Industrial Park
Scope of project is 1.5 Mt of Aluminum production




                                                                                 Additional capacity of up to
                                                                                 500,000 tpa of Green
                                                                                 Aluminum. Adaro plans for this
                                             Additional production               to be powered by hydro.
                                             capacity of up to 500,000 tpa
                                             aluminum.
                                             Adaro may invest in the
                                             smelter’s power generation.
                                             Power generation will likely be a
    Production capacity: 500,000 tpa         hybrid of coal and renewables.
    aluminum. Adaro plans to invest in the
    smelter’s power generation.
                                                                                                                  9
Page 10
    Progress of Aluminum Smelter
•    Smelter: KAI started the piling works for the foundation of
     the aluminium smelter area. In 4Q23, KAI will continue to
     work on the soil improvement and land levelling.

•    Jetty: finished coastal jetty breakwater, and will continue
     work on dredging, construction for heavy cargo, universal
     cargo and berthing trestle.

•    Power plant: conducting piling works at power plant
     area.

•    Supporting facilities

      o Completed the land clearing for the permanent dorms
        and construction of ancillary facilities such as outdoor
        laydown warehouse, heavy equipment workshop, and
        batching plant.

      o In parallel started the piling works for temporary
        camp, indoor warehouse, and brick factory.




                                                                   10
Page 11
Adaro Green
Page 12
Indonesia’s Largest Hydro Power Plant




                                        •   Planned installed capacity of 1,375 MW, with the
                                            potential to generate approximately 9 Terawatt hours
                                            (TWh) per annum.

                                        •   Located in North Kalimantan, this power plant will
                                            provide affordable, reliable, and sustainable energy to
                                            support the Kaltara Industrial Park. COD is estimated
                                            in 2030.

                                        •   Will use the Concrete Faced Rockfill Dam (CFRD),
                                            designed with a dam crest height of 235m and crest
                                            length of 815m.This hydro power plant will have one
                                            of the world’s tallest dams.




                                                                                                      12
Page 13
One of Indonesia’s Largest Wind IPPs



                                 •   Planned installed capacity of 70 MW with battery
                                     energy storage system (BESS) of 10 MWh.

                                 •   Located in South Kalimantan, this power plant will
                                     provide affordable sustainable energy to support
                                     PLN’s grid within South Kalimantan. COD is estimated
                                     in 2025.

                                 •   This is a consortium made up of Total Eren, PT Adaro
                                     Clean Energy Indonesia, and PT PJBI (PLN’s
                                     subsidiary IPP).




                                                                                            13
Page 14
Integrating the Value Chain for Solar PV and BESS



                                   •   Signed MoU to develop the industrialization of solar
                                       panel supply chain in Indonesia, which include solar
                                       photovoltaic and battery energy storage systems.

                                   •   Supporting the government’s plan in development of
                                       domestic solar power industry and infrastructure.

                                   •   This is a consortium made up of PT Adaro Power, PT
                                       Medco Power Indonesia, and PT Energi Baru TBS.




                                                                                              14
Page 15
Recently Energized Captive Solar PV
~600 kWp to supply to our mining area

                                        o We have installed 130 kWp PV Rooftop, and another
                                          468 kWp PV Floating (one of the largest operational
                                          floating PV in Indonesia)

                                        o The project is expected to generate 156,000 kWh/year
                                          and serves a captive market to support Adaro Group’s
                                          mining operation.

                                        o Environmental impact of this project includes replacing
                                          33,000 liters of diesel per year, and avoiding emission
                                          of 98 ton CO2/year.




                                                                                                    15
Page 16
Adaro Energy
Page 17
Adaro Energy Indonesia’s Performance
Continue to deliver consistent results and strong cash flows


                                OPERATIONAL                9M23             9M22             Change
Production (Mt)                                                     50.73            45.37             12%
Sales (Mt)                                                          49.12            44.17             11%
OB removal (Mbcm)                                                  217.43           173.52             25%
FINANCIAL ($ millions, unless indicated)                   9M23             9M22             Change
Revenue                                                            4,981            5,913             -16%
Core Earnings                                                      1,481            2,331             -39%
Operational EBITDA                                                 1,944            3,798             -49%
Cash                                                               3,425            3,353              2%
Net Debt (Cash)                                                   (1,835)          (1,843)              0%
Capex                                                                 473              277             71%
Free Cash Flow                                                      1,448            2,071            -30%
Operational EBITDA Margin                                           39%              64%              -25%
Net Debt (Cash) to Equity (x)                                      (0.25)           (0.29)            -14%
Net Debt (Cash) to Last 12 months Operational EBITDA (x)           (0.58)           (0.39)            -49%
Cash from Operations to Capex (x)                                   1.87            11.39             -84%




                                                                                                             17
Page 18
Large Reserves and Diverse Portfolio across Indonesia
and Australia
  1                         2                            3                             4                                           As of 31 December 2022, AEI
                                                         PT Adaro Minerals
   Adaro Indonesia: 88.5%    Balangan Coal                                                MIP: 75% stake                        has more than 8 billion tonnes
                                                         Indonesia Tbk (AMI):
   Existing,                 Companies:
                                                         Central and East
                                                                                          S Sumatra                             (Bt) of resources and 1.3 Bt of
   S Kalimantan              S Kalimantan                                                 sub-bituminous                           reserves across thermal and
                                                         Kalimantan
   sub-bituminous            sub-bituminous                                               Reserves 207 Mt
   Reserves: 682 Mt          Reserves 118Mt
                                                         Metallurgical coal
                                                                                          Resources 301 Mt
                                                                                                                                metallurgical coal – providing us
                                                         Reserves: 165 Mt                                                       with flexibility in the coal market.
   Resources: 3.2 Bt         Resources: 257 Mt
                                                         Resources: 975 Mt



  5                         6
   BEE: 61.04% stake         BEP: 18.5% stake with
   S Sumatra                 option to acquire 90%                                                                                                    6
   sub-bituminous            E Kalimantan
   Geological study phase    sub-bituminous
                             Resources 3.3 Bt                                                                           Kalimantan
                                                                                                5
                                                                         Sumatra                                                3


  7                                                                                                                                                   Sulawesi
                                                     7
   Kestrel Coal Mine                NT                                                                                         1
                                           QLD                                  4                                                           2
   48% of 80%
   Queensland, Australia    WA
   Premium HCC                       SA

                                                                                                                Java
                                             NSW
   Reserves: 184 Mt
   Resources: 421 Mt                       VIC

                                             TAS


                                                                 Note: Reserves and Resources numbers above are before taking into account AEI’s equity ownership
                                                                                                                                                                       18
Page 19
Regulatory Updates

    Conversion of CCOW to IUPK
    • Continuation of AI’s CCOW.
    • Government Regulation (PP No 15 of 2022) stipulates the changes in the commercial terms: royalty rate,
      CIT rate, and additional profit sharing with the regional and central government.
                                                                        CCOW                      IUPK
        1     Royalty rate                                                         13.5%             14% - 28%
        2     CIT                                                                    45%                   22%
        3     Non-tax state revenue (government’s portion – from
              net income)
              - Central Gov't                                                           -                   4%
              - Regional Gov't                                                          -                   6%


    •   In line with conversion to IUPK, AI’s concession size has been reduced, but does not affect our operation
        or our reserves.

    Change in the royalty rate of IUP
    • This impacts MIP and Balangan Coal mines, representing approximately 17% of 2022 production. The
      royalty going forward will be based on HBA pricing and could increase to between 7% - 10.5% from 3% -
      5%.

                                                                                                                    19
Page 20
Regulatory Updates
  Change in the formula of Harga Batubara Acuan (HBA)

  •   Indonesia has introduced the reformulation of HBA to better reflect the value of Indonesian coal. The new
      HBA has three coal categories: HBA (6,322 kcal GAR), HBA I (5,200 kcal GAR), and HBA II (4,200 kcal
      GAR).
  •   The HBA will be derived from an average of actual traded Indonesian prices – 70% is based on the
      average price of the second and third weeks of the previous month and 30% is based on the average
      price of the first week of the previous month and the fourth week of the previous two months.




                                                                                                                  20
Page 21
Solid Financials Backed by Strong Operations
     Financial position continues to improve                                                                                Strong cash balance and free cash flow generation
                                                                                                                            4,500
  2,500                                                                                        60%
                                                                                                                            4,000
  2,000                                                                                        40%                          3,500
                                                                                                                            3,000
  1,500                                                                                        20%                          2,500
                                                                                                                            2,000
  1,000                                                                                        0%                           1,500
                                                                                                                            1,000
   500                                                                                         -20%
                                                                                                                              500
         -                                                                                     -40%                             -
                           FY18      FY19        FY20         FY21        FY22        9M23                                           FY18          FY19    FY20          FY21    FY22          9M23
                                      Interest Bearing Debt          Debt to Equity
                                                                                                                                     Cash (million US$)    FCF (million US$)    Capex (million US$)




                                                                                       Adaro Historical Production
                      70                                                                                                                                                                8.00

                      60                                                                                                                                                                7.00
                                                                                                                                                                                        6.00
                      50
    Production (Mt)




                                                                                                                                                                                               Strip Ratio (x)
                                                                                                                                                                                        5.00
                      40
                                                                                                                                                                                        4.00
                      30
                                                                                                                                                                                        3.00
                      20
                                                                                                                                                                                        2.00
                      10                                                                                                                                                                1.00
                       0                                                                                                                                                                -
                           1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022

                                                                        Tutupan         Wara          Paringin   Balangan   ADMR        MIP           SR                                                         21
Page 22
Industry Leading Efficiency
One of the lowest cost operators in Indonesia
         Adaro’s estimated coal cash cost breakdown (9M23)                                                          Electrification to reduce the usage of diesel gensets
                                      Fixed
                                    overhead,
                                       5%
             Coal
          processing,
             10%
                                                           Mining,
                                                         35% - 40%
                                Freight &
                                handling,
                                  20%


                                             Fuel, 25%
                                               - 30%




                                            Strong operational EBITDA generation and healthy operational EBITDA margin

           6,000                                                                      62%                    70%
                                                                                                                   ▪ Consistently delivers on operational EBITDA target
           5,000                                                          53%                                60%
                                                                                                                     and performed in-line with guidance.
           4,000        40%
                                                                                                             50%   ▪ Healthy operational EBITDA margin on the back of
                                      39%                                                            39%
                                                  35%          35%                                           40%     better cost control from integrated business model.
           3,000
                                                                                      5,030                  30%
           2,000
                                                                                                             20%
           1,000                                                         2,104                       1,944   10%
                        1,315        1,408        1,207            883
              -                                                                                              0%
                        2017         2018         2019         2020      2021         2022           9M23

                                     Operational Ebitda (US $ M)         Operational Ebitda Margin
                                                                                                                                                                            22
Page 23
Well Positioned Product and Strong Customer Base
Focused on Asia
                                       Envirocoal is among the lowest pollutant content coal in the seaborne market

        Ash content: 2%-3% (adb)                        Nitrogen content : 0.9% - 1.0% (daf)           Sulfur content: 0.1% - 0.25% (adb)




              Thermal Coal Sales by Destination (9M23)                                            Customer type by volume (9M23)


                              India
                               12%                                                                             Others,
                                            Indonesia
                                               24%                                                              10%


             Northeast Asia
                  18%

                                                                                                                                   Power
                                                                                                                                 Plant, 90%
                                                                                                                                              *others include cement,
                                                                                                                                              pulp & paper, and industrial
                                                China
                                                 22%
                      Southeast Asia
                           25%


                                                                                                                                                                             23
Page 24
Operates Mining Services and Logistics to Ensure
Operational Excellence

   Key part of our vertical integration.

   Ensures operational excellence, productivity
   improvement and timely reliable delivery to
   customers.
   Stable earnings profile buffers against the volatility in
   coal price.
   Focus on providing services for companies in the
   Adaro Group.




                                                         Units   9M23           9M22            9M23 vs 9M22

                     Overburden Removal                  Mbcm       166.84             137.72       21%
   SIS
                     Coal Transport to Port                Mt           46.86           42.89       9%
   MBP               Coal barging                          Mt           47.71           41.63       15%



                                                                                                               24
Page 25
One of Indonesia’s largest IPPs
Adaro Power’s gross power generation capacity stands at 2,260 MW

                                      Makmur Sejahtera Wisesa – CFPP

                    Size / Tech.                2 x 30 MW CFB technology

                    Shareholders                100% Adaro Power

                    COD                         #1 Jun 2013, #2 Feb 2014

                    Availability Factor         86.91% (Avg. 9M23)

                    Adaro Mining                Current: 11.7 MW
                    Electrification             Plan: additional 17.9 MW



                                   Makmur Sejahtera Wisesa – Solar PV

                    Size                    130 kWp + 467 kWp                                               Bhimasena Power Indonesia – CFPP
                    Shareholder             100% Adaro Power                                Size / Tech.          2 x 1,000 MW Ultra Super Critical
                    COD                     Q3 2018 (for 130 kWp) & 467 kWp COD             Shareholders          34% AP, 34% JPower, 32% Itochu
                                            27 December 2021
                                                                                            Project cost          USD 4.2 billion
                    Project cost            USD 800,000 (approx.)
                                                                                            Availability Factor   81.50% (Avg. 9M23)
                    Electricity             602.94 MWh (9M23)
                    produced


                                                                                  Apart from improving the performance of its already-operated
                                       Tanjung Power Indonesia – CFPP
                                                                                   power plants and completing the construction, Adaro Power
                    Size / Tech.               2 x 100 MW CFB technology                   continues to study renewable power projects such as
                    Shareholders               65% AP, 35% Korea EWP                biomass, wind power, and solar PV to support PLN through
                    Project cost               USD 545 million
                                                                                   unsolicited proposal and tenders. Adaro Power is also in the
                                                                                  process of developing captive use power generation projects
                    COD                        2019
                                                                                    for the Group’s other business units such as IBT (Genset &
                    Availability Factor        89.96% (Avg. 9M23)                                             Solar PV) and ADMR (Mini-hydro)
                                                                                                                                                      25
Page 26
Owns & Operates 1,670 lps of Water Treatment Plants
     Also Supports Mining Operations through Slurry Management Business Unit
              Dumai Tirta Persada             1                                                      2                              Drupadi Tirta Gresik
                                                                                                                                                                    3
                                                                     Grenex Tirta Mandiri
              Location       : Dumai, Riau                                                                                          Location       : Gresik, East Java
                                                                     Location      : Bekasi, West Java
              Size           : 450 lps                                                                                              Size           : 400 lps
                                                                     Size          : 200 lps
              Adaro Shares : 49%                                                                                                    Adaro Shares : 100%
                                                                     Adaro Shares : 49%
              Status         : First phase                                                                                          Status         : In operation
                                                                     Status        : Started construction
                               (50 lps) completed                                                                                                    since 2012



              Adaro Wamco Prima                   4                      1
              Location     : Tanjung,
                             South Kalimantan
              Business     : Mining pump services
              Adaro Shares : 60%                                                                          4
              Status       : Operation


                                                                                               6
                                                           5
                                                                                                              5
            Drupadi Tirta Intan
            Location        : Banjar, South Kalimantan
            Size            : 500 lps                                                                 3
            Adaro Shares : 100%                                               2
            Status          : In operation since 2012



            Adaro Tirta Mentaya                                  6       Adaro Water is currently in the process to achieve operational excellence through
            Location      : Sampit, Central Kalimantan                 continuous improvement in its operating subsidiaries, including WTPs operations and
            Size          : 320 lps (contract), 400 lps (capacity)     slurry pumps operations. Meanwhile, on the construction side, Adaro Water continues
            Adaro Shares : 90%                                         to ensure that the project can achieve its goals in terms of schedule, budget & quality.
            Status        : In operation upto 250 lps                   From business development perspective, Adaro Water continues to actively seeking
                                                                                       for new projects through PPP, non PPP and acquisition.


                                                                                                                                                                         26
Page 27
PT Adaro Minerals
Indonesia Tbk
(IDX:ADMR)
Page 28
PT Adaro Minerals Indonesia Tbk at a Glance

Indonesia's top metallurgical coal producer, with an industry-leading cost structure and growing client
base. We are also developing an Aluminium Smelter at the Kaltara Industrial Park, as our first step in
supporting the Government’s downstream initiatives.

                     Large coal reserves and resources, supporting long-term sustainable growth. Coal reserves: 165.4 Mt.
                     Coal resources: 975 Mt.*

                     Strong demand profile from blue-chip steel companies. Customers are primarily from Asian countries
                     including Japan, China, India, South Korea, and Indonesia.

                    Offers coal supply diversification for customers and close proximity to key markets, reducing
                    transportation times and enabling a competitive cost structure.


                     Consistent volume growth in the medium term, reaching 6 Mt in 2025.


                     Developing an aluminium smelter, with planned total capacity of 1.5 Mt, supporting the Indonesian
                     government’s downstream initiatives in batteries and electric vehicles.

     *Coal Reserves and Resources data is as of August 2021 from independent consultant PT Quantus Consultants Indonesia



                                                                                                                            28
Page 29
Company Overview
CCoWs Locations     Coal Resources and Reserves
                                                       Total Coal      Total Coal
                                                                                         Compliance
                   Company / Locality                  Reserves        Resources
                                                                                          Standard
                                                          (Mt)            (Mt)
                   LC - Haju
                                                            2.3           4.3                  JORC
                   (Green Coal)
                   MC - Lampunut
                                                           84.3          100.3                 JORC
                   (Metallurgical and Green Coal)
                   JC - Juloi Northwest
                                                             -           629.9                 JORC
                   (Metallurgical)
                   JC - Bumbun
                                                           55.5          174.5                 JORC
                   (Metallurgical)
                   KC - Luon
                                                           17.7           50.9                 JORC
                   (Metallurgical)
                   SBC - Dahlia Arwana
                                                            5.6           15.0                 JORC
                   (Metallurgical)
                   TOTAL                                   165.4         975.0

                                     Coal production (in million tonnes)
                           5.0
                                                                                   55%   4.0
                           4.0                                   3.4
                           3.0                      2.3                          2.6
                                            1.9
                           2.0
                                   1.1
                           1.0
                           0.0
                                  2019     2020     2021     2022            9M22        9M23
                                                                                                      29
Page 30
Supply Chain: from Coal Terminal to Vessel Loading Points

                                               Barge-to-barge




                                               Barge-to-vessel




                                                Bulk Terminal




                                                                 30
Page 31
Competitive Advantages
                                                             • Low ash
                                                             • Low phosphorus
                                                Product      • High vitrinite
                                                Quality
       Committed to develop
       the community and
       minimize environmental                                                         Lampunut is the first and
                                  CSR and                                             only HCC in Indonesia
       impact through various
       green initiatives           Green                             Position         (Source: IHS Markit)
                                 Initiatives


                                               Competitive
                                               Advantages

                                                                        Coal           The western mines
       Lampunut is a very low-                                        Resources        projects are one of the
       cost mine, ranked            Low                                  and           largest greenfield projects
       within the lowest            cost                              Reserves         in the world
       quartile in the global
       cost curve
                                                  The
                                                 manage-
                                                  ment       Managed by seasoned Adaro
                                                             executives and engineers with proven
                                                             track record of creating maximum
                                                             sustainable value
                                                                                                                     31
Page 32
Sustainability and
Green Initiatives
Page 33
Balance of People, Planet and Purpose
Key programs in Corporate Social Responsibility                                       Green Initiatives




        Education                     Economic                      Health
                                     development
                                                                                         Solar PV                             Biodiesel




                    Environmental                  Socio-cultural
                    enhancement                     Enrichment
                                                                                                          Biomass Co-Firing               NZE Statement




MSCI ESG Rating History                                                               Fifth PROPER Gold Award

 AAA7
  AA6
   A5
 BBB4                                                      BBB               BBB
  BB3                               BB
   B2          B
 CCC1
   0
            Jun-19              May-20                   Aug-21              Jul-22
                                                                                                                                                          33
Page 34
Improving Environmental Performance

                  Reduced total energy consumption by 21% y-o-y                                       …and reduced GHG emission (scope 1) by 22% y-o-y

                                                                                                  2,500,000
                  35,000
                  30,000                                                                          2,000,000
                  25,000




                                                                                     Ton Co2 eq
                                                                                                  1,500,000
      Terajoule




                  20,000
                  15,000                                                                          1,000,000
                  10,000
                                                                                                   500,000
                   5,000
                      -                                                                                  -
                               2019       2020            2021                                                    2019            2020               2021



                                          Innovative projects to improve efficiency and environmental performance




                    Fleet Management                                                                                             Kelanis Smart Inverter
                       System reduces                                                                                            Solar Cell reduces
                    queueing time and                                                                                            diesel usage and CO2
                          energy used                                                                                            emission




                                                                                                                                                            34
Page 35
Ecosystem Restoration and Carbon Capture



                           Through Adaro Land Pillar, we have subsidiaries which own forest
                           management permits for ecosystem restoration and forest management
                           permits for carbon absorption.


                           PT Alam Sukses Lestari holds license to use timber product – ecosystem
                           restoration in natural forest which allows restoration of forest ecosystem
                           to achieve balanced biodiversity.


                           PT Hutan Amanah Lestari holds license for utilization of carbon
                           absorption and is one of the largest holders of such license in Indonesia.
                           We expect that once operational, carbon trading will be the main business
                           of this company.




                                                                                                        35
Page 36
Awards and Recognitions
               2013                            2014                            2015                            2016                           2017

     PROPER green award              PROPER green award              PROPER green award             PROPER green award             PROPER green award
     Ministry of Environment &       Ministry of Environment &       Ministry of Environment &      Ministry of Environment &      Ministry of Environment &
     Forestry                        Forestry                        Forestry                       Forestry                       Forestry
     Aditama gold award              Aditama gold award              Cultural based community       Global CSR bronze award        Aditama gold award
     For environmental excellence    For environmental excellence    empowerment award              For community-led sanitation   For environment excellence in
     in the coal sector              in the coal sector              Awards in several categories   Annual Global CSR & Summit     the coal sector
     Ministry of Energy & mineral    Ministry of Energy & mineral    Corporate Forum for                                           Ministry of Energy & mineral
     resources                       resources                       Community Development &        Padmamitra award               resources
                                                                     Ministry of Human Dev          For poverty alleviation
     Global CSR bronze award         Bronze sustainability award                                    Ministry of Social Affairs     Best of environmental
     For sustainable clean water     For sustainable investment      Bakti Husada award                                            management & safety award
     program                         RobecoSAM                       For community health                                          Ministry of Energy & mineral
     Pinnacle Group Global CSR                                       development                                                   resources
                                                                     Ministry of Health




               2018                            2019                            2020                            2021                          2022

     PROPER green award              PROPER gold award               PROPER gold award              PROPER gold award              PROPER gold award
     Ministry of Environment &       Ministry of Environment &       Ministry of Environment &      Ministry of Environment &      Ministry of Environment &
     Forestry                        Forestry                        Forestry                       Forestry                       Forestry
     Aditama gold award              Global CSR award, one gold      MSCI ESG Ratings upgraded      MSCI ESG Ratings upgraded      Global CSR Gold Award
     For environment excellence in   and two silver                  to BB                          to BBB                         For Excellence in Provision of
     the coal sector                 For early childhood education   MSCI                           MSCI                           Literacy and Education
     Ministry of Energy & mineral    program, CSR Leadership and                                                                   Annual Global CSR & Summit
     resources                       environmental excellence in     Charity and Community          Best Environmental
                                     leader program.                 Impact                         Excellence Award - Silver      Green Initiative Award
     Best of coal mining service     Annual Global CSR & Summit      Coaltrans Asia                 Global CSR Summit & Awards     Recognizing the company’s
     business management &                                                                                                         initiatives to diversify and
     safety award                                                    Best Implementation of         Aditama award                  increase share of new and
     Ministry of Energy & mineral                                    Good Mining Practices          Good mining practices          renewable energy
     resources                                                       MoEMR                          MoEMR                          Katadata

                                                                                                                                                                    36
Page 37
Industry Outlook
Page 38
Prices Remain Near Historical Highs

   700

   600

   500

   400
 US$




   300

   200

   100

       0




                                                     NEX     ICI 3       ICI 4   HBA   HCC PLV FOB Australia


  ▪ Prices continue to fluctuate.

  ▪ Demand from China has supported Indonesian thermal coal imports.

  ▪ Indonesian coal demand is still expected to be high due to its competitiveness and unique characteristics.

  ▪ The average price of Platts premium low-volatile hard coking coal FOB Australia benchmark grew 22% year-on-year to $354/mt, while the
       Indonesia’s reference price (HBA) declined to around $125.5/mt.
                                                                                                                                            38
Page 39
Seaborne Thermal Coal Demand and Supply Outlook

                    Global thermal coal imports demand (Mt)                                                         Global thermal coal supply (Mt)

                    1200
                                                                                                                            1200
                    1000
                                                                                                                            1000
                     800
   Million Tonnes




                                                                                                                             800




                                                                                                           Million Tonnes
                     600
                                                                                                                             600

                     400                                                                                                     400

                     200                                                                                                     200

                       0                                                                                                       0
                        2021 2022 2023 2024 2025 2026 2027 2028 2029 2030                                                       2021    2022   2023     2024   2025   2026   2027   2028   2029   2030
                           China                 India                    East Asia
                                                                                                                            Indonesia    Australia    Russia   Colombia   South Africa   USA   Others
                           Southeast Asia        Other South Asia         Middle East
Sources: Adaro Analysis


                     ▪ Coal remains as significant part of energy mix in emerging economies in Asia
                     ▪ Despite push towards renewable energy, emerging economies in Asia still rely on coal for electricity generation due to its availability and affordability.
                     ▪ As the world aims to reduce carbon emission, demand for coal will be affected.


                                                                                                                                                                                                         39
Page 40
         Seaborne Metallurgical Coal Demand and Supply Outlook
                  Global metallurgical coal imports demand (Mt)                                             Global metallurgical coal supply (Mt)

                 350                                                                              350

                 300                                                                              300

                 250                                                                              250
Million Tonnes




                                                                                                  200
                 200
                                                                                                  150
                 150
                                                                                                  100
                 100
                                                                                                   50
                  50
                                                                                                    0
                   0                                                                                 2022      2023        2024     2025   2026     2027       2028     2029   2030
                    2022   2023       2024      2025     2026    2027      2028    2029    2030                Australia          Canada       United States   Mongolia
                       China     India       Japan     South Korea      Europe    Others                       Russia             Mozambique   Indonesia       Others
            Sources: Adaro Analysis


                   Underinvestment and Robust Demand expected to lead to Undersupplied market

                   •  The long-term outlook shows a positive and stable growth of demand and supply.
                   •  India to be the main driver of growth for the next decade, outpacing China and Japan.
                   •  Australia continues to be the main supplier in seaborne market, but supply growth will be constrained due to underinvestment in some supplying
                   countries.
                                                                                                                                                                                      40
Page 41
Indonesian Long-Term Demand Remains Robust
Supported by growing downstream activities in Indonesia
            Coal Fired Power Plant Capacities in 2021 - 2030
                                                                                                                           Coke capacity increase
                                                                                                 25
       50

                                                                                                 20
       40




                                                                                Million Tonnes
                                                                                                 15
GW




       30
                                                                                                 10
       20
                                                                                                 5

       10
                                                                                                 0
                                                                                                              2021                   2022          2023        2024
         0                                                                                        Risun Wei Shan     Detian Coking     KinXiang    Kinrui     Dexin Steel
          2021 2022 2023 2024 2025 2026 2027 2028 2029 2030                                       Krakatau Steel     Krakatau POSCO    Tsingshan   Indocoke
    Source: RUPTL 2021 – 2030, ESDM 2022, APBI



•    CFPP capacity continues to increase to support the transition in minerals processing and refinery in Indonesia.
•    Indonesia coke capacities are expected to reach 21 Mt in 2024, which translates to 35 Mt of metallurgical coal consumption.

                                                                                                                                                                            41
Page 42
Thank you




            42

File

File Open PDF
Source IDX
Size6.46 MB
Published23 Nov 2023
Pages42
Characters69,620
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 0 people and organisations named in the text · linked when the evidence is strong

The name pass has not read this document yet.

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

Other files in this announcement 1

↑↓ select ↵ open ⇧↵ see every result