Skip to content
Back to announcement

FS AEI 30 September 2023.pdf

Financial statement Text extracted ADRO

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 177

Page 1

          
Page 2

          
Page 3

          
Page 4
                                                PT ADARO ENERGY INDONESIA Tbk
                                           DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                             Lampiran 1/1 Schedule

LAPORAN POSISI KEUANGAN                                                                         INTERIM CONSOLIDATED STATEMENTS
KONSOLIDASIAN INTERIM PADA TANGGAL                                                                      OF FINANCIAL POSITION AS AT
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                                     30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                                                  (Expressed in thousands of US Dollars,
kecuali nilai nominal dan data saham)                                                                  except for par value and share data)

                                              Catatan/         30 September              31 Desember/
                                               Notes               2023                 December 2022

ASET                                                                                                                                            ASSETS

ASET LANCAR                                                                                                                   CURRENT ASSETS
Kas dan setara kas                                4                    3,424,669                  4,067,358              Cash and cash equivalents
Kas dan deposito berjangka yang
  dibatasi penggunaannya -                                                                                                 Restricted cash and time
  bagian lancar                                   5                         4,274                     4,110              deposits - current portion
Piutang usaha                                     7a                      406,237                   647,153                       Trade receivables
Investasi lain-lain -                                                                                                           Other investments -
  bagian lancar                                   6                        57,392                   104,923                         current portion
Persediaan                                        9                       255,438                   199,200                              Inventories
Pajak dibayar dimuka -                                                                                                               Prepaid taxes -
  bagian lancar                                  33a                          93,631                  44,386                        current portion
Pajak yang bisa dipulihkan
  kembali                                        33b                          39,186                  39,196                   Recoverable taxes
                                                                                                                               Other receivables -
Piutang lain-lain - bagian lancar                 7b                          41,103                  17,821                     current portion
Pinjaman untuk pihak ketiga -                                                                                              Loans to third parties -
  bagian lancar                                   14                      165,267                   159,121                      current portion
Pinjaman untuk pihak berelasi -                                                                                          Loans to related parties -
  bagian lancar                                  34b                               -                   3,059                     current portion
Uang muka dan biaya dibayar                                                                                           Advances and prepayments -
  dimuka - bagian lancar                          8                           46,003                  15,616                     current portion
Aset lancar lain-lain                                                          3,570                  17,366                 Other current assets

Total aset lancar                                                      4,536,770                 5,319,309                      Total current assets

ASET TIDAK LANCAR                                                                                                         NON-CURRENT ASSETS
Kas dan deposito berjangka yang
  dibatasi penggunaannya -                                                                                               Restricted cash and time
  bagian tidak lancar                             5                           51,778                  44,422       deposits - non-current portion
Investasi lain-lain -                                                                                                          Other investments -
  bagian tidak lancar                             6                       487,858                   492,363                   non-current portion
Piutang lain-lain - bagian tidak                                                                                                Other receivables -
  lancar                                          7b                      90,028                    90,299                    non-current portion
Investasi pada ventura bersama                    11                   1,369,726                 1,277,509           Investments in joint ventures
Pinjaman untuk pihak ketiga -                                                                                               Loans to third parties -
  bagian tidak lancar                             14                            470                       383                 non-current portion
Pinjaman untuk pihak berelasi -                                                                                          Loans to related parties -
  bagian tidak lancar                            34b                      141,792                   140,594                   non-current portion
Uang muka dan biaya dibayar                                                                                          Advances and prepayments -
  dimuka - bagian tidak lancar                    8                       121,629                     38,955                  non-current portion
Pajak dibayar dimuka -                                                                                                              Prepaid taxes -
  bagian tidak lancar                            33a                       8,257                      2,969                   non-current portion
Properti pertambangan                            12                    1,005,495                  1,033,258                      Mining properties
Aset tetap                                        10                   1,667,372                  1,451,993                           Fixed assets
Goodwill                                          13                     776,943                    776,943                                Goodwill
Aset takberwujud                                                           4,891                      5,279                       Intangible assets
Piutang jasa konsesi                                                      23,503                     19,030        Service concession receivables
Aset pajak tangguhan                             33e                     100,891                     81,263                    Deferred tax assets
Aset tidak lancar lain-lain                                                7,059                      7,738              Other non-current assets

Total aset tidak lancar                                                5,857,692                  5,462,998               Total non-current assets

TOTAL ASET                                                            10,394,462                10,782,307                            TOTAL ASSETS




  Catatan atas laporan keuangan konsolidasian interim terlampir merupakan        The accompanying notes to the interim consolidated financial statements
  bagian yang tidak terpisahkan dari laporan keuangan konsolidasian interim       form an integral part of these interim consolidated financial statements.
                             secara keseluruhan.
Page 5
                                                PT ADARO ENERGY INDONESIA Tbk
                                           DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                             Lampiran 1/2 Schedule

LAPORAN POSISI KEUANGAN                                                                         INTERIM CONSOLIDATED STATEMENTS
KONSOLIDASIAN INTERIM PADA TANGGAL                                                                      OF FINANCIAL POSITION AS AT
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                                     30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                                                  (Expressed in thousands of US Dollars,
kecuali nilai nominal dan data saham)                                                                  except for par value and share data)

                                              Catatan/         30 September              31 Desember/
                                               Notes               2023                 December 2022

LIABILITAS DAN EKUITAS                                                                                                  LIABILITIES AND EQUITY

LIABILITAS                                                                                                                                 LIABILITIES

LIABILITAS JANGKA PENDEK                                                                                            CURRENT LIABILITIES
Utang usaha                                       15                      418,016                   333,212                   Trade payables
Utang dividen                                     27                        1,980                   532,495               Dividends payable
Beban yang masih harus dibayar                    17                      305,671                   164,056               Accrued expenses
Liabilitas imbalan kerja jangka                                                                                Short-term employee benefits
  pendek                                                                       1,449                 1,430                         liabilities
Utang pajak:                                                                                                                  Taxes payable:
  - Pajak penghasilan badan                      33c                          70,116             1,144,085 Corporate income tax payable -
  - Pajak lainnya                                33c                          52,208                31,962           Other taxes payable -
Utang royalti                                    16                           31,386                49,511                  Royalties payable
Bagian lancar atas pinjaman                                                                                     Current maturity of long-term
  jangka panjang:                                                                                                               borrowings:
  - Liabilitas sewa                               18                       26,182                   32,755               Lease liabilities -
  - Utang bank                                    19                      260,808                  142,945                    Bank loans -
Provisi pembongkaran, rehabilitasi,                                                                         Provision for decommissioning,
  reklamasi dan penutupan                                                                                  mine rehabilitation, reclamation
  tambang - bagian jangka pendek                  22                           2,850                 5,940    and closure - current portion
Utang lain-lain                                                               17,847                 9,121                     Other liabilities

Total liabilitas jangka pendek                                         1,188,513                 2,447,512                   Total current liabilities

LIABILITAS JANGKA PANJANG                                                                                            NON-CURRENT LIABILITIES
Pinjaman dari pihak ketiga                                                         -                   3,256              Loans from third parties
Pinjaman jangka panjang setelah
  dikurangi bagian yang akan                                                                                         Long-term borrowings, net of
  jatuh tempo dalam satu tahun:                                                                                                current maturities:
  - Liabilitas sewa                               18                       66,702                    34,895                    Lease liabilities -
  - Utang bank                                    19                      610,234                   667,904                         Bank loans -
Senior Notes                                      20                      696,356                   700,890                           Senior Notes
Liabilitas pajak tangguhan                       33e                      156,738                   163,410                  Deferred tax liabilities
                                                                                                                        Post-employment benefits
Liabilitas imbalan pasca kerja                    21                          64,996                  59,288                            liabilities
                                                                                                                   Provision for decommissioning,
Provisi pembongkaran, rehabilitasi,                                                                                           mine rehabilitation,
  reklamasi dan penutupan                                                                                             reclamation and closure -
  tambang - bagian jangka panjang                 22                      200,319                   177,814                   non-current portion

Total liabilitas jangka panjang                                        1,795,345                  1,807,457           Total non-current liabilities

TOTAL LIABILITAS                                                       2,983,858                  4,254,969                      TOTAL LIABILITIES




  Catatan atas laporan keuangan konsolidasian interim terlampir merupakan        The accompanying notes to the interim consolidated financial statements
  bagian yang tidak terpisahkan dari laporan keuangan konsolidasian interim       form an integral part of these interim consolidated financial statements.
                             secara keseluruhan.
Page 6
                                                PT ADARO ENERGY INDONESIA Tbk
                                           DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                             Lampiran 1/3 Schedule

LAPORAN POSISI KEUANGAN                                                                      INTERIM CONSOLIDATED STATEMENTS
KONSOLIDASIAN INTERIM PADA TANGGAL                                                                   OF FINANCIAL POSITION AS AT
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                                  30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                                               (Expressed in thousands of US Dollars,
kecuali nilai nominal dan data saham)                                                               except for par value and share data)

                                              Catatan/         30 September           31 Desember/
                                               Notes               2023              December 2022

LIABILITAS DAN EKUITAS                                                                                               LIABILITIES AND EQUITY

EKUITAS                                                                                                                                       EQUITY

Ekuitas yang diatribusikan                                                                                               Equity attributable to
  kepada pemilik entitas induk                                                                                  owners of the parent entity
Modal saham - modal dasar                                                                                             Share capital - authorised
  80.000.000.000 lembar;                                                                                              80,000,000,000 shares;
  ditempatkan dan disetor penuh                                                                                          issued and fully paid
  31.985.962.000 lembar dengan                                                                                      31,985,962,000 shares at
  nilai nominal Rp100 per saham                   23                     342,940                 342,940        par value of Rp100 per share
Tambahan modal disetor, neto                      24                   1,154,494               1,154,494          Additional paid-in capital, net
Saham treasuri                                    23                    (158,308)               (139,936)                       Treasury shares
                                                                                                                        Difference in value from
Selisih transaksi dengan                                                                                                     transactions with
  pihak non-pengendali                            25                      154,773                153,614             non-controlling interests
Saldo laba                                                                                                                    Retained earnings
  - Dicadangkan                                   26                      68,588                 68,588                        Appropriated -
  - Belum dicadangkan                             26                   5,131,763              4,412,865                     Unappropriated -
Penghasilan komprehensif lain                                             88,036                 32,035           Other comprehensive income

Total ekuitas yang diatribusikan                                                                                   Total equity attributable to
  kepada pemilik entitas induk                                         6,782,286               6,024,600         owners of the parent entity

Kepentingan non-pengendali                        28                      628,318                502,738              Non-controlling interests

TOTAL EKUITAS                                                          7,410,604               6,527,338                            TOTAL EQUITY

TOTAL LIABILITAS DAN                                                                                                  TOTAL LIABILITIES AND
 EKUITAS                                                              10,394,462             10,782,307                            EQUITY




  Catatan atas laporan keuangan konsolidasian interim terlampir merupakan     The accompanying notes to the interim consolidated financial statements
  bagian yang tidak terpisahkan dari laporan keuangan konsolidasian interim    form an integral part of these interim consolidated financial statements.
                             secara keseluruhan.
Page 7
                                                PT ADARO ENERGY INDONESIA Tbk
                                           DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                             Lampiran 2/1 Schedule

LAPORAN LABA RUGI DAN PENGHASILAN                                                  INTERIM CONSOLIDATED STATEMENTS OF PROFIT
KOMPREHENSIF LAIN KONSOLIDASIAN INTERIM                                              OR LOSS AND OTHER COMPREHENSIVE INCOME
UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR                                                   FOR THE NINE-MONTH PERIODS ENDED
PADA TANGGAL 30 SEPTEMBER 2023 DAN 2022                                                                 30 SEPTEMBER 2023 AND 2022
(Dinyatakan dalam ribuan Dolar AS,                                                                (Expressed in thousands of US Dollars,
kecuali laba per saham dasar dan dilusian)                                                except for basic and diluted earnings per share)

                                              Catatan/                        30 September
                                               Notes                 2023                       2022

Pendapatan usaha                                   29                   4,981,096                 5,913,149                                      Revenue

Beban pokok pendapatan                             30                  (2,993,325)               (2,548,098)                           Cost of revenue

Laba bruto                                                              1,987,771                 3,365,051                                 Gross profit

Beban usaha                                        31                    (332,404)                  (231,821)                  Operating expenses
(Beban)/pendapatan lain-lain, neto                 32                     (36,708)                    18,385          Other (expenses)/income, net

Laba usaha                                                              1,618,659                 3,151,615                         Operating income

Biaya keuangan                                                                (81,429)                (62,255)                           Finance costs
Penghasilan keuangan                                                           97,638                  23,113                          Finance income
Bagian atas keuntungan neto                                                                                                        Share in net profit of
  ventura bersama                                  11                         75,298                 221,120                          joint ventures

                                                                              91,507                 181,978

Laba sebelum pajak penghasilan                                          1,710,166                 3,333,593                Profit before income tax

Beban pajak penghasilan                           33d                    (332,332)               (1,165,055)                       Income tax expense

Laba periode berjalan                                                   1,377,834                 2,168,538                       Profit for the period

Penghasilan/(kerugian)
  komprehensif lain                                                                                            Other comprehensive income/
  periode berjalan:                                                                                                   (loss) for the period:
Pos-pos yang akan direklasifikasi                                                                                 Items that will be reclassified
  ke laba rugi:                                                                                                              to profit or loss:
Perubahan nilai wajar atas investasi                                                                                    Changes in fair value of
  pada instrumen utang pada nilai                                                                              investment in debt securities
  wajar melalui penghasilan                                                                                             at fair value through
  komprehensif lain                                6a                           (106)                  (1,477) other comprehensive income
                                                                                                                   Exchange difference due to
Selisih kurs karena penjabaran                                                                                          financial statements
  laporan keuangan                                                            15,189                  (36,267)                     translation
Bagian atas penghasilan
  komprehensif lain dari                                                                                          Share of other comprehensive
  ventura bersama                                 11                          31,768                 138,375        income of joint ventures
Perubahan atas nilai wajar                                                                                     Changes in fair value of cash flow
  lindung nilai arus kas                                                            -                  (3,903)                        hedges
Pajak penghasilan terkait pos-pos ini             33d                               -                   1,756 Income tax relating to these items

                                                                              46,851                   98,484




  Catatan atas laporan keuangan konsolidasian interim terlampir merupakan         The accompanying notes to the interim consolidated financial statements
  bagian yang tidak terpisahkan dari laporan keuangan konsolidasian interim        form an integral part of these interim consolidated financial statements.
                             secara keseluruhan.
Page 8
                                                PT ADARO ENERGY INDONESIA Tbk
                                           DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                             Lampiran 2/2 Schedule

LAPORAN LABA RUGI DAN PENGHASILAN                                                 INTERIM CONSOLIDATED STATEMENTS OF PROFIT
KOMPREHENSIF LAIN KONSOLIDASIAN INTERIM                                             OR LOSS AND OTHER COMPREHENSIVE INCOME
UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR                                                  FOR THE NINE-MONTH PERIODS ENDED
PADA TANGGAL 30 SEPTEMBER 2023 DAN 2022                                                                30 SEPTEMBER 2023 AND 2022
(Dinyatakan dalam ribuan Dolar AS,                                                               (Expressed in thousands of US Dollars,
kecuali laba per saham dasar dan dilusian)                                               except for basic and diluted earnings per share)

                                              Catatan/                        30 September
                                               Notes                 2023                      2022

Penghasilan/(kerugian)                                                                                            Other comprehensive income/
  komprehensif lain                                                                                                      (loss) for the period:
  periode berjalan: (lanjutan)                                                                                                        (continued)
Pos-pos yang tidak akan                                                                                           Items that will not be reclassified
  direklasifikasi ke laba rugi:                                                                                                  to profit or loss:
Perubahan nilai wajar atas investasi                                                                                       Changes in fair value of
  pada funds pada nilai                                                                                                     investment in funds
  wajar melalui penghasilan                                                                                                at fair value through
  komprehensif lain                                6a                         10,300                      194     other comprehensive income

Penghasilan komprehensif                                                                                              Other comprehensive income
  lain periode berjalan, setelah pajak                                        57,151                  98,678            for the period, net of tax

Total penghasilan komprehensif                                                                                     Total comprehensive income
  periode berjalan                                                      1,434,985                2,267,216                    for the period

Laba periode berjalan yang dapat                                                                                             Profit for the period
  diatribusikan kepada:                                                                                                        attributable to:
Pemilik entitas induk                                                   1,218,898                1,903,401               Owners of the parent entity
Kepentingan non-pengendali                        28                      158,936                  265,137                 Non-controlling interests

Laba periode berjalan                                                   1,377,834                2,168,538                       Profit for the period

Total penghasilan komprehensif                                                                                              Total comprehensive
  periode berjalan yang dapat                                                                                            income for the period
  diatribusikan kepada:                                                                                                        attributable to:
Pemilik entitas induk                                                   1,274,899                2,002,289               Owners of the parent entity
Kepentingan non-pengendali                        28                      160,086                  264,927                 Non-controlling interests

Total penghasilan komprehensif                                                                                     Total comprehensive income
  periode berjalan, setelah pajak                                       1,434,985                2,267,216          for the period, net of tax

Laba per saham                                                                                                                  Earnings per share
  diatribusikan kepada                                                                                                   attributable to owners
  pemilik entitas induk                           35                                                                         of the parent entity
  - Dasar (nilai penuh)                                                   0.03941                   0.06122                  Basic (full amount) -
  - Dilusian (nilai penuh)                                                0.03941                   0.06122                Diluted (full amount) -




  Catatan atas laporan keuangan konsolidasian interim terlampir merupakan        The accompanying notes to the interim consolidated financial statements
  bagian yang tidak terpisahkan dari laporan keuangan konsolidasian interim       form an integral part of these interim consolidated financial statements.
                             secara keseluruhan.
Page 9
                                                                                                                  PT ADARO ENERGY INDONESIA Tbk
                                                                                                             DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                                                                                                  Lampiran 3/1 Schedule

LAPORAN PERUBAHAN EKUITAS KONSOLIDASIAN INTERIM                                                                                                                                               INTERIM CONSOLIDATED STATEMENTS OF CHANGES IN EQUITY
UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA TANGGAL                                                                                                                                                           FOR THE NINE-MONTH PERIODS ENDED
30 SEPTEMBER 2023 DAN 2022                                                                                                                                                                                                30 SEPTEMBER 2023 AND 2022
(Dinyatakan dalam ribuan Dolar AS)                                                                                                                                                                                   (Expressed in thousands of US Dollars)


                                                                                Diatribusikan kepada pemilik entitas induk/Attributable to owners of the parent entity
                                                                                                                                                            Penghasilan/(kerugian) komprehensif lain/
                                                                                                                                                                Other comprehensive income/(loss)
                                                                                                                                                                                                              Cadangan
                                                                                                                                                                                                          perubahan nilai
                                                                                                                                                                                                              wajar aset
                                                                                                                                                                                                          keuangan pada
                                                                                                                                                                                                         nilai wajar melalui
                                                                                                                                                                                         Bagian             penghasilan
                                                                                                                                                                   Cadangan          penghasilan/       komprehensif lain/
                                                                                Selisih transaksi                                                              atas perubahan          (kerugian)            Reserve for
                                                                                  dengan pihak                                                                     nilai wajar      komprehensif           changes in fair
                                            Tambahan                           non-pengendali/                                                Translasi             lindung             lain dari              value of
                                              modal                                 Difference                                                  mata            nilai arus kas/   ventura bersama/        financial assets
                                          disetor, neto/        Saham             in value from        Saldo laba/Retained earnings          uang asing/         Reserve for        Share of other           at fair value                    Kepentingan
                                            Additional         treasuri/       transactions with                           Belum               Foreign         changes in fair     comprehensive           through other                     non-pengendali/       Total
                      Modal saham/           paid-in           Treasury         non-controlling     Dicadangkan/        dicadangkan/          currency          value of cash       income/(loss)         comprehensive                      Non-controlling      ekuitas/
                      Share capital        capital, net         shares              interests       Appropriated       Unappropriated        translation         flow hedges       of joint ventures           income          Total            interests       Total equity

Saldo pada                                                                                                                                                                                                                                                                           Balance as at
 1 Januari 2022              342,940           1,154,494           (97,070)                7,852             68,588            2,714,907            (19,970)                  -             (51,940)                 16,979     4,136,780            321,535       4,458,315      1 January 2022

Total penghasilan                                                                                                                                                                                                                                                             Total comprehensive
   komprehensif                                                                                                                                                                                                                                                                  income for the
   periode berjalan                   -                    -               -                    -                  -           1,903,401            (36,201)            (1,899)             138,291                  (1,303)   2,002,289             264,927       2,267,216             period
Pembelian                                                                                                                                                                                                                                                                              Purchase of
   saham treasuri                     -                    -       (42,866)                     -                  -                    -                  -                  -                    -                       -      (42,866)                 -         (42,866)  treasury shares
Dividen                                                                                                                                                                                                                                                                                  Dividends
   (Catatan 27                                                                                                                                                                                                                                                                        (Notes 27
   dan 28)                            -                    -               -                    -                  -            (300,000)                  -                  -                    -                       -    (300,000)            (93,984)       (393,984)           and 28)

Saldo pada                                                                                                                                                                                                                                                                          Balance as at
   30 September                                                                                                                                                                                                                                                                  30 September
   2022                      342,940           1,154,494          (139,936)                7,852             68,588            4,318,308            (56,171)            (1,899)              86,351                  15,676     5,796,203            492,478       6,288,681             2022




                        Catatan atas laporan keuangan konsolidasian interim terlampir merupakan bagian yang                                                                       The accompanying notes to the interim consolidated financial statements form an
                          tidak terpisahkan dari laporan keuangan konsolidasian interim secara keseluruhan.                                                                               integral part of these interim consolidated financial statements.
Page 10
                                                                                                                   PT ADARO ENERGY INDONESIA Tbk
                                                                                                              DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                                                                                                   Lampiran 3/2 Schedule

LAPORAN PERUBAHAN EKUITAS KONSOLIDASIAN INTERIM                                                                                                                                                INTERIM CONSOLIDATED STATEMENTS OF CHANGES IN EQUITY
UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA TANGGAL                                                                                                                                                            FOR THE NINE-MONTH PERIODS ENDED
30 SEPTEMBER 2023 DAN 2022                                                                                                                                                                                                 30 SEPTEMBER 2023 AND 2022
(Dinyatakan dalam ribuan Dolar AS)                                                                                                                                                                                    (Expressed in thousands of US Dollars)
                                                                                 Diatribusikan kepada pemilik entitas induk/Attributable to owners of the parent entity
                                                                                                                                                             Penghasilan/(kerugian) komprehensif lain/
                                                                                                                                                                 Other comprehensive income/(loss)
                                                                                                                                                                                                               Cadangan
                                                                                                                                                                                                           perubahan nilai
                                                                                                                                                                                                               wajar aset
                                                                                                                                                                                                           keuangan pada
                                                                                                                                                                                                          nilai wajar melalui
                                                                                                                                                                                          Bagian             penghasilan
                                                                                                                                                                    Cadangan          penghasilan/       komprehensif lain/
                                                                                 Selisih transaksi                                                              atas perubahan          (kerugian)            Reserve for
                                                                                   dengan pihak                                                                     nilai wajar      komprehensif           changes in fair
                                             Tambahan                           non-pengendali/                                                Translasi             lindung             lain dari              value of
                                               modal                                 Difference                                                  mata            nilai arus kas/   ventura bersama/        financial assets
                                           disetor, neto/        Saham             in value from        Saldo laba/Retained earnings          uang asing/         Reserve for        Share of other           at fair value                      Kepentingan
                                             Additional         treasuri/       transactions with                           Belum               Foreign         changes in fair     comprehensive           through other                       non-pengendali/       Total
                       Modal saham/           paid-in           Treasury         non-controlling     Dicadangkan/        dicadangkan/          currency          value of cash       income/(loss)         comprehensive                        Non-controlling      ekuitas/
                       Share capital        capital, net         shares              interests       Appropriated       Unappropriated        translation         flow hedges       of joint ventures           income          Total              interests       Total equity

Saldo pada                                                                                                                                                                                                                                                                               Balance as at
 1 Januari 2023               342,940           1,154,494          (139,936)              153,614             68,588            4,412,865            (67,903)                  -              88,971                  10,967     6,024,600              502,738       6,527,338       1 January 2023

Total penghasilan                                                                                                                                                                                                                                                                Total comprehensive
   komprehensif                                                                                                                                                                                                                                                                      income for the
   periode berjalan                    -                    -               -                    -                  -           1,218,898             15,064                   -              31,768                   9,169    1,274,899               160,086       1,434,985               period
Pembelian                                                                                                                                                                                                                                                                                  Purchase of
   saham treasuri                                                                                                                                                                                                                                                                  treasury shares
   (Catatan 23)                        -                    -       (18,372)                     -                  -                    -                  -                  -                    -                       -      (18,372)                   -         (18,372)          (Note 23)
Penerbitan saham                                                                                                                                                                                                                                                                            Issuance of
   entitas anak                                                                                                                                                                                                                                                                        subsidiaries’
   kepada                                                                                                                                                                                                                                                                                 shares to
   kepentingan                                                                                                                                                                                                                                                                      non-controlling
   non-pengendali                                                                                                                                                                                                                                                                          interests
   (Catatan 28)                        -                    -               -                    -                  -                    -                  -                  -                    -                       -               -            48,404          48,404           (Note 28)
Akuisisi kepentingan                                                                                                                                                                                                                                                                     Acquisition of
   non-pengendali                                                                                                                                                                                                                                                                   non-controlling
   (Catatan 28)                        -                    -               -                    -                  -                    -                  -                  -                    -                       -               -            (1,129)         (1,129) interest (Note 28)
Transaksi dengan                                                                                                                                                                                                                                                                     Transactions with
   pihak                                                                                                                                                                                                                                                                            non-controlling
   non-pengendali                                                                                                                                                                                                                                                                          interests
   (Catatan 25)                        -                    -               -               1,159                   -                    -                  -                  -                    -                       -           1,159                 -           1,159           (Note 25)
Dividen                                                                                                                                                                                                                                                                                       Dividends
   (Catatan 27                                                                                                                                                                                                                                                                           (Notes 27
   dan 28)                             -                    -               -                    -                  -            (500,000)                  -                  -                    -                       -    (500,000)              (81,781)       (581,781)             and 28)

Saldo pada                                                                                                                                                                                                                                                                              Balance as at
   30 September                                                                                                                                                                                                                                                                      30 September
   2023                       342,940           1,154,494          (158,308)              154,773             68,588            5,131,763            (52,839)                  -             120,739                  20,136     6,782,286              628,318       7,410,604              2023




                         Catatan atas laporan keuangan konsolidasian interim terlampir merupakan bagian yang                                                                       The accompanying notes to the interim consolidated financial statements form an
                           tidak terpisahkan dari laporan keuangan konsolidasian interim secara keseluruhan.                                                                               integral part of these interim consolidated financial statements.
Page 11
                                                PT ADARO ENERGY INDONESIA Tbk
                                           DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                             Lampiran 4/1 Schedule

LAPORAN ARUS KAS KONSOLIDASIAN INTERIM                                                INTERIM CONSOLIDATED STATEMENTS OF CASH
UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR                                              FLOWS FOR THE NINE-MONTH PERIODS ENDED
PADA TANGGAL 30 SEPTEMBER 2023 DAN 2022                                                               30 SEPTEMBER 2023 AND 2022
(Dinyatakan dalam ribuan Dolar AS)                                                               (Expressed in thousands of US Dollars)

                                               Catatan/                30 September
                                                Notes               2023          2022

Arus kas dari aktivitas operasi                                                                             Cash flows from operating activities
Penerimaan dari pelanggan                                            5,222,482              5,610,059                    Receipts from customers
Pembayaran kepada pemasok
  dan kontraktor                                                    (1,555,510)            (1,195,642) Payments to suppliers and contractors
Pembayaran biaya karyawan                                             (230,748)              (188,740)        Payments of employee costs
Penerimaan penghasilan bunga                                            77,877                 10,633            Receipts of finance income
Pembayaran royalti                                                  (1,204,345)              (831,966)                Payments of royalties
Pembayaran pajak penghasilan badan                                                                        Payments of corporate income tax
  dan pajak penghasilan final                                       (1,454,488)              (460,281)               and final income tax
Penerimaan restitusi pajak penghasilan                                     636                  3,698       Receipts of income tax refunds
Pembayaran biaya keuangan                                              (63,641)               (42,684)           Payments of finance costs
Penerimaan lain-lain, neto                                               6,576                  1,653                     Other receipts, net

Arus kas bersih yang diperoleh dari                                                                                       Net cash flows provided
  aktivitas operasi                                                    798,839              2,906,730                  from operating activities

Arus kas dari aktivitas investasi                                                                           Cash flows from investing activities
Pembelian investasi lain-lain                                            (8,941)              (317,384)            Purchase of other investments
Pembayaran atas
  penambahan aset tetap                                               (412,094)               (239,687)      Payments for addition of fixed assets
Arus kas keluar bersih dari akuisisi                                                                             Net cash outflow from acquisition
  entitas anak                                                                (107)                     -                       of subsidiaries
Penerimaan hasil penjualan                                                                                                Proceeds from sales of
  investasi lain-lain                                                    46,864                 90,711                      other investments
Pembelian Senior Notes                             20                    (7,030)               (19,927)                 Purchase of Senior Notes
Pembayaran atas penambahan                                                                                        Payments for addition of mining
  properti pertambangan                                                 (16,897)               (15,874)                              properties
Pembayaran atas penambahan aset                                                                                Payments for addition of intangible
  takberwujud                                                            (1,582)                (1,282)                                  assets
Pemberian pinjaman ke pihak ketiga                                      (11,998)              (148,524)                 Loan given to third parties
Pemberian pinjaman ke pihak berelasi                                     (1,291)                     -               Loan given to a related party
Penerimaan hasil penjualan aset tetap              10                     2,513                    336      Proceeds from disposal of fixed assets
Penempatan kas dan deposito
  berjangka yang dibatasi                                                                                          Placement of restricted cash and
  penggunaannya                                                         (19,918)               (10,460)                           time deposits
Penerimaan dari pencairan kas dan
  deposito berjangka yang dibatasi                                                                      Proceeds from withdrawal of restricted
  penggunaannya                                                          12,800                   6,422             cash and time deposits
Penerimaan pembayaran kembali                                                                          Receipts from repayment of loans given
  pinjaman ke pihak berelasi                                              3,381                 1,708                      to related parties
Penerimaan pembayaran kembali                                                                          Receipts from repayment of loans given
  pinjaman ke pihak ketiga                                                7,862                     -                         to a third party
Pembayaran atas penambahan                                                                                 Payments for additional investment
  investasi pada ventura bersama                                         (3,676)              (45,690)                      in joint ventures
Penerimaan dividen dari investasi                                                                        Dividends received from investments
  pada ventura bersama                                                   18,525                 8,775                       in joint ventures
Penerimaan dari piutang lain-lain                                             -               131,764           Receipt from other receivables

Arus kas bersih yang digunakan                                                                                                Net cash flows used in
  untuk aktivitas investasi                                           (391,589)               (559,112)                       investing activities




  Catatan atas laporan keuangan konsolidasian interim terlampir merupakan        The accompanying notes to the interim consolidated financial statements
  bagian yang tidak terpisahkan dari laporan keuangan konsolidasian interim       form an integral part of these interim consolidated financial statements.
                             secara keseluruhan.
Page 12
                                                PT ADARO ENERGY INDONESIA Tbk
                                           DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                             Lampiran 4/2 Schedule

LAPORAN ARUS KAS KONSOLIDASIAN INTERIM                                              INTERIM CONSOLIDATED STATEMENTS OF CASH
UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR                                            FLOWS FOR THE NINE-MONTH PERIODS ENDED
PADA TANGGAL 30 SEPTEMBER 2023 DAN 2022                                                             30 SEPTEMBER 2023 AND 2022
(Dinyatakan dalam ribuan Dolar AS)                                                             (Expressed in thousands of US Dollars)

                                               Catatan/                30 September
                                                Notes               2023          2022

Arus kas dari aktivitas pendanaan                                                                          Cash flows from financing activities
Penerimaan utang bank                                                  205,734                393,000                   Proceeds from bank loans
Pembayaran utang bank                                                 (129,901)              (307,500)                 Repayments of bank loans
Pembayaran pinjaman dari pihak ketiga                                   (3,256)                  (358)      Repayments of loan from third parties
Pembayaran dividen kepada                                                                                                Payments of dividends to
  pemegang saham Perusahaan                        27               (1,000,000)              (650,000)            the Company’s shareholders
Pembayaran dividen kepada                                                                                                Payments of dividends to
  kepentingan non-pengendali                                          (112,296)              (122,508)                 non-controlling interests
Pembayaran liabilitas sewa                         37                  (28,106)               (40,672)                Payments of lease liabilities
Penerimaan setoran modal dari                                                                                    Proceeds of capital injection from
  kepentingan non-pengendali                                             48,254                        -              non-controlling interests
Penerimaan dari kepentingan                                                                                         Proceeds from non-controlling
  non-pengendali atas akuisisi                                                                              interests on the acquisition of interest
  kepentingan pada entitas anak                                               121                      -                         in subsidiaries
Pembayaran untuk pembelian                                                                                                Payments for purchase
  saham treasuri                                                        (18,372)              (42,866)                      of treasury shares
Pembayaran beban yang berhubungan
  dengan pinjaman                                                       (20,216)              (11,415)                Payments of loan-related cost

Arus kas bersih yang digunakan                                                                                               Net cash flows used in
  untuk aktivitas pendanaan                                         (1,058,038)              (782,319)                       financing activities

(Penurunan)/kenaikan bersih                                                                                           Net (decrease)/increase in
  kas dan setara kas                                                  (650,788)            1,565,299               cash and cash equivalents

Kas dan setara kas                                                                                                  Cash and cash equivalents at
  pada awal periode                                                  4,067,358             1,811,141               the beginning of the period

Efek perubahan nilai kurs pada                                                                                 Effect of exchange rate changes on
  kas dan setara kas                                                      8,099               (23,801)              cash and cash equivalents

Kas dan setara kas pada                                                                                             Cash and cash equivalents at
  akhir periode                                                      3,424,669             3,352,639                    the end of the period


Lihat Catatan 37 untuk penyajian informasi arus kas Grup.                              Refer to Note 37 for presentation of the Group’s cash
                                                                                       flow information.




  Catatan atas laporan keuangan konsolidasian interim terlampir merupakan       The accompanying notes to the interim consolidated financial statements
  bagian yang tidak terpisahkan dari laporan keuangan konsolidasian interim      form an integral part of these interim consolidated financial statements.
                             secara keseluruhan.
Page 13
                                   PT ADARO ENERGY INDONESIA Tbk
                              DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                             Lampiran 5/1 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                            30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                         (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                  unless otherwise stated)

1.   UMUM                                                   1.   GENERAL

     a.   Pendirian    Perusahaan      dan    informasi          a.   Establishment of the Company and other
          lainnya                                                     information

          PT     Adaro     Energy     Indonesia     Tbk               PT Adaro Energy Indonesia Tbk (the
          (“Perusahaan”) didirikan berdasarkan Akta                   “Company”) was established by Notarial Deed
          Notaris Sukawaty Sumadi, S.H., Notaris di                   No. 25 dated 28 July 2004 of Sukawaty
          Jakarta, No. 25, tertanggal 28 Juli 2004. Akta              Sumadi, S.H., Notary in Jakarta. The Deed
          pendirian Perusahaan diumumkan dalam                        was published in the State Gazette of the
          Berita Negara Republik Indonesia Neso. 59,                  Republic of Indonesia No. 59, dated 25 July
          tertanggal 25 Juli 2006, Tambahan Berita                    2006, State Gazette Supplement No. 8036
          Negara No. 8036 dan disetujui oleh Menteri                  and was approved by the Minister of Justice of
          Kehakiman Republik Indonesia dengan Surat                   the Republic of Indonesia in Decree
          Keputusan No. C-21493 HT.01.01.TH.2004,                     No. C-21493 HT.01.01.TH.2004, dated
          tertanggal 26 Agustus 2004. Anggaran Dasar                  26 August 2004. The Articles of Association of
          Perusahaan telah diubah beberapa kali                       the Company have been amended several
          dengan perubahan terakhir berdasarkan Akta                  times, with the most recent change by Deed
          No. 16 tertanggal 15 Februari 2022 yang                     No. 16 dated 15 February 2022 made before
          dibuat di hadapan Mahendra Adinegara, S.H.,                 Mahendra Adinegara, S.H., M.Kn., Notary in
          M.Kn., Notaris di Jakarta Selatan, untuk                    South Jakarta, to change the Company’s
          mengubah nama Perusahaan menjadi                            name to PT Adaro Energy Indonesia Tbk. This
          PT Adaro Energy Indonesia Tbk. Perubahan                    amendment to the Articles of Association has
          Anggaran Dasar ini telah mendapatkan                        obtained approval from the Minister of Law
          persetujuan dari Menteri Hukum dan Hak                      and Human Rights of the Republic of
          Asasi      Manusia     Republik      Indonesia              Indonesia pursuant to Decree No. AHU-
          berdasarkan surat keputusan No. AHU-                        0011776.AH.01.02.TAHUN         2022     dated
          0011776.AH.01.02.TAHUN 2022 tertanggal 16                   16 February 2022.
          Februari 2022.

          Pada bulan Juli 2008, Perusahaan melakukan                  In July 2008, the Company conducted an
          Penawaran Umum Saham Perdana sebanyak                       Initial  Public    Offering    (“IPO”)    of
          11.139.331.000 lembar saham (34,8% dari                     11,139,331,000     shares     (34.8%       of
          31.985.962.000     modal     saham      yang                31,985,962,000 shares issued and fully paid
          ditempatkan dan disetor penuh). Penawaran                   up). The shares offered to the public in the
          kepada masyarakat tersebut dicatat di Bursa                 IPO were listed on the Indonesia Stock
          Efek Indonesia pada tanggal 16 Juli 2008.                   Exchange on 16 July 2008.

          Sesuai dengan Pasal 3 Anggaran Dasar                        In accordance with Article 3 of the Company’s
          Perusahaan, Maksud dan Tujuan Perusahaan                    Articles of Association, the Purpose and
          adalah menjalankan usaha dalam bidang                       Objectives of the Company are conducting
          aktivitas kantor pusat dan konsultasi                       business in the field of head office and
          manajemen (untuk kegiatan usaha entitas                     management consulting activities (for the
          anak Perusahaan yang bergerak dalam                         Company’s subsidiaries’ business activities
          bidang pertambangan, penggalian, jasa                       which include mining, quarrying, mining
          penunjang      pertambangan,    perdagangan                 support services, trading, transportation,
          besar, angkutan, pergudangan dan aktivitas                  warehousing and transportation support
          penunjang angkutan, penanganan kargo                        services, cargo handling (stevedoring), sea
          (bongkar muat barang), aktivitas pelayanan                  port     service     activities,    agriculture,
          kepelabuhanan laut, pertanian tanaman,                      construction, repair and installation of
          konstruksi, reparasi dan pemasangan mesin,                  machines, power supply, water treatment,
          pengadaan listrik, pengelolaan air, kehutanan               forestry and industry).
          dan industri).

          Perusahaan       mulai    beroperasi     secara             The Company commenced its commercial
          komersial pada bulan Juli 2005. Perusahaan                  operations in July 2005. The Company’s head
          berdomisili di Jakarta dan berlokasi di Gedung              office is in Jakarta and is located at the
          Menara Karya, lantai 23, Jl. H.R. Rasuna Said               Menara Karya Building, 23rd floor, Jl. H.R.
          Blok X-5, Kav. 1-2, Jakarta Selatan.                        Rasuna Said Block X-5, Kav. 1-2, South
                                                                      Jakarta.
Page 14
                                   PT ADARO ENERGY INDONESIA Tbk
                              DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/2 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                   FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                               30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                            (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                     unless otherwise stated)

1.   UMUM (lanjutan)                                        1.   GENERAL (continued)

     a.   Pendirian Perusahaan         dan    informasi          a.      Establishment of the Company and other
          lainnya (lanjutan)                                             information (continued)

          PT Adaro Strategic Investments merupakan                       PT Adaro Strategic Investments is the
          pengendali langsung dari Perusahaan karena                     Company’s direct controlling parent entity
          PT Adaro Strategic Investments mempunyai                       because PT Adaro Strategic Investments has
          kemampuan untuk menentukan secara                              the ability to directly determine the
          langsung pengelolaan dan/atau kebijakan                        management and/or policies of the Company,
          Perusahaan, sebagaimana dimaksud dalam                         as referred to in Article 1 number 4 letter b of
          Pasal 1 angka 4 huruf b Peraturan Otoritas                     the Financial Services Authority Regulation
          Jasa Keuangan No. 9/POJK.04/2018 tentang                       No.      9/POJK.04/2018        concerning    the
          Pengambilalihan     Perusahaan     Terbuka,                    Acquisition of a Public Company, where
          dimana Christian Ariano Rachmat, Crescento                     Christian Ariano Rachmat,              Crescento
          Hermawan, Garibaldi Thohir, dan Michael                        Hermawan, Garibaldi Thohir, and Michael
          W.P. Soeryadjaya, masing-masing sebagai                        W.P. Soeryadjaya, each as a member of the
          anggota Direksi PT Adaro Strategic                             Board of Directors of PT Adaro Strategic
          Investments adalah Pemilik Manfaat (Ultimate                   Investments, are the Ultimate Beneficial
          Beneficial Owner) Perusahaan, karena                           Owners of the Company, because the
          Pemilik Manfaat PT Adaro Strategic                             Beneficial Owners of PT Adaro Strategic
          Investments memiliki kewenangan atau                           Investments have the authority or power to
          kekuasaan     untuk    memengaruhi      atau                   influence or control the Company without
          mengendalikan Perusahaan tanpa harus                           having to obtain authorisation from any
          mendapat otorisasi dari pihak manapun,                         parties, as stipulated in Article 4 paragraph (1)
          sebagaimana diatur dalam Pasal 4 ayat (1)                      letter e of Presidential Regulation No. 13/2018
          huruf e Peraturan Presiden No. 13/2018                         on Implementation Of Know-Your-Beneficial-
          tentang Penerapan Prinsip Mengenali Pemilik                    Owner Principle By Corporation For The
          Manfaat Dari Korporasi Dalam Rangka                            Purpose Of Prevention and Eradication Of
          Pencegahan dan Pemberantasan Tindak                            Money Laundering and Terrorism Financing.
          Pidana Pencucian Uang dan Tindak Pidana
          Pendanaan Terorisme.

          Berdasarkan Akta No. 44 tertanggal 22 Mei                      Based on Deed No. 44 dated 22 May 2023
          2023 yang dibuat dihadapan Humberg Lie,                        made before Humberg Lie, S.H., S.E., M.Kn.,
          S.H., S.E., M.Kn., Notaris di Jakarta Utara dan                Notary in North Jakarta and Deed No. 15
          Akta No. 15 tertanggal 15 Februari 2022, yang                  dated 15 February 2022, made before
          dibuat di hadapan Mahendra Adinegara, S.H.,                    Mahendra Adinegara, S.H., M.Kn., Notary in
          M.Kn., Notaris di Jakarta Selatan, susunan                     South Jakarta, the composition of the
          anggota Direksi dan Dewan Komisaris                            Company’s Boards of Commissioners and
          Perusahaan pada tanggal 30 September 2023                      Directors as at 30 September 2023 and
          dan 31 Desember 2022 adalah sebagai                            31 December 2022 was as follows:
          berikut:

           Presiden Komisaris             :     Edwin Soeryadjaya                :             President Commissioner
           Wakil Presiden Komisaris       :     Theodore Permadi Rachmat         :        Vice President Commissioner
           Komisaris                      :     Arini Saraswaty Subianto         :                       Commissioner
           Komisaris Independen           :     Mohammad Effendi                 :         Independent Commissioners
                                                Budi Bowoleksono

           Presiden Direktur              :     Garibaldi Thohir               :                      President Director
           Wakil Presiden Direktur        :     Christian Ariano Rachmat       :                 Vice President Director
           Direktur                       :     Julius Aslan                   :                              Directors
                                                Chia Ah Hoo
                                                M. Syah Indra Aman
                                                Michael William P. Soeryadjaya

          Susunan Komite Audit Perusahaan pada                           The composition of the Company’s Audit
          tanggal 30 September 2023 dan 31 Desember                      Committee as at 30 September 2023 and
          2022 adalah sebagai berikut:                                   31 December 2022 was as follows:

          Ketua                           :    Mohammad Effendi                  :                             Chairman
          Anggota                         :    Ignatius Robby Sani               :                             Members
                                               Lindawati Gani

          Pada    tanggal   30     September      2023,                  As at 30 September 2023, the Company and
          Perusahaan dan entitas anaknya memiliki                        its subsidiaries had 13,884 permanent
          13.884 karyawan tetap (31 Desember 2022:                       employees (31 December 2022: 12,320
          12.320 karyawan tetap) (tidak diaudit).                        permanent employees) (unaudited).
Page 15
                                               PT ADARO ENERGY INDONESIA Tbk
                                          DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                               Lampiran 5/3 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                                            30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                                                         (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                                                  unless otherwise stated)

1.   UMUM (lanjutan)                                                                1.           GENERAL (continued)

     b.   Struktur grup                                                                          b.   Group structure

          Pada laporan keuangan konsolidasian interim                                                 In these interim consolidated financial
          ini, Perusahaan dan entitas anaknya secara                                                  statements, the Company and its subsidiaries
          keseluruhan dirujuk sebagai “Grup”.                                                         are collectively referred to as the “Group”.

          Pada tanggal 30 September 2023 dan                                                          As at 30 September 2023 and 31 December
          31 Desember 2022, struktur Grup adalah                                                      2022, the structure of the Group was as
          sebagai berikut:                                                                            follows:
                                                                                  Mulai beroperasi
                                         Kegiatan                                    komersial/               Persentase                      Total aset
                                          usaha/                                  Commencement            kepemilikan efektif/          (sebelum eliminasi)/
                                         Business          Kedudukan/              of commercial        Effective percentage of              Total assets
                                          activity          Domicile                 operations                ownership                 (before elimination)
                                                                                                                      31 Desember/                   31 Desember/
                                                                                                      30 September     December    30 September       December
                                                                                                          2023            2022         2023              2022

          Entitas anak melalui kepemilikan langsung/Directly owned subsidiaries

          PT Alam Tri Abadi          Perdagangan             Indonesia                    2007               100%           100%       6,787,380         7,732,068
             (“ATA”) a)                dan jasa/
                                       Trading and
                                       services

          PT Saptaindra              Jasa                    Indonesia                    2002               100%           100%         900,978           784,383
             Sejati (“SIS”)            pertambangan/
                                       Mining services

          PT Alam Tri Bangun         Investasi/              Indonesia                     -                 100%           100%         200,180           309,694
             Indonesia (“ATBI”)         Investment

          PT Adaro Minerals          Jasa                    Indonesia                    2016                84%            84%       1,517,974         1,286,625
             Indonesia Tbk             pertambangan/
             (“AMI”) a)                Mining services

          PT Alam Tri Cakra          Investasi/              Indonesia                     -                 100%           100%           7,670             6,854
             Indonesia (“ATCI”)         Investment

          PT Adaro Clean Energy      Investasi/              Indonesia                      -                100%           100%          90,952            91,892
             Indonesia (“ACEI”) a)      Investment

          PT Adaro Power             Investasi/              Indonesia                     -                 100%           100%       1,223,072         1,097,432
             (“AP”) a)                  Investment

          Entitas anak melalui kepemilikan tidak langsung/Indirectly owned subsidiaries

          PT Adaro Indonesia         Pertambangan/           Indonesia                    1992                88%            88%       3,301,581         4,226,482
             (“AI”)                    Mining

          PT Dianlia                 Investasi/              Indonesia                     -                 100%           100%          73,862            72,229
             Setyamukti                Investment
             (“Dianlia”)

          PT Biscayne                Investasi/              Indonesia                     -                 100%           100%              98                98
             Investments               Investment
             (“Biscayne”)

          PT Indonesia Bulk          Jasa pengelolaan        Indonesia                    1997               100%           100%          58,785            66,771
             Terminal (“IBT”)          terminal/
                                       Terminal
                                       handling service

          PT Adaro Persada           Jasa/Services           Indonesia                    2006               100%           100%          84,089            93,887
             Mandiri (“APM”) a)

          Arindo Holdings            Investasi/               Mauritius                    -                  90%            90%       2,011,259         2,071,562
              (Mauritius) Ltd          Investment
              (“Arindo
              Holdings”) a)

          Vindoor                    Investasi/               Mauritius                    -                  90%            90%       1,524,473         1,584,616
             Investments               Investment
             (Mauritius) Ltd
             (“Vindoor”) a)

          Adaro International        Perdagangan             Singapura/                   2001                90%            90%       1,050,867         1,077,139
            (Singapore)                batubara/                Singapore
            Pte Ltd                    Coal trading
            (“AIS”)

          PT Viscaya                 Investasi/              Indonesia                     -                 100%           100%         434,104           424,440
             Investments               Investment
             (“Viscaya”)

          PT Sarana Daya             Jasa/Services           Indonesia                    2009                30%            30%           9,615            21,141
             Mandiri (“SDM”)
Page 16
                                               PT ADARO ENERGY INDONESIA Tbk
                                          DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                               Lampiran 5/4 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                                            30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                                                         (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                                                  unless otherwise stated)

1.   UMUM (lanjutan)                                                                 1.          GENERAL (continued)
     b.   Struktur grup (lanjutan)                                                               b. Group structure (continued)
                                                                                 Mulai beroperasi
                                         Kegiatan                                   komersial/                   Persentase                      Total aset
                                          usaha/                                 Commencement                kepemilikan efektif/          (sebelum eliminasi)/
                                         Business           Kedudukan/            of commercial            Effective percentage of              Total assets
                                          activity           Domicile               operations                    ownership                 (before elimination)
                                                                                                                         31 Desember/                   31 Desember/
                                                                                                         30 September     December    30 September       December
                                                                                                             2023            2022         2023              2022

          Entitas anak melalui kepemilikan tidak langsung/Indirectly owned subsidiaries (lanjutan/continued)

          Orchard Maritime           Pengelolaan dan         Singapura/                 2006                    100%           100%             270               274
             Logistics Pte             pengangkutan             Singapore
             Ltd (“OML”)               batubara/Coal
                                       handling and
                                       barging

          PT Adaro Logistics         Investasi/               Indonesia                    -                    100%           100%         614,025           663,632
             (“AL”) a)                  Investment

          PT Maritim Barito          Pengelolaan dan          Indonesia                 2004                    100%           100%         450,869           496,142
             Perkasa                   pengangkutan
             (“MBP”)                   batubara/Coal
                                       handling and
                                       barging

          PT Harapan                 Pengangkutan             Indonesia                 2004                    100%           100%          23,263            25,399
             Bahtera                   laut domestik/
             Internusa                 Domestic sea
             (“HBI”)                   transportation

          PT Makmur                  Perdagangan dan          Indonesia                 2013                    100%           100%         137,325           143,782
             Sejahtera                 pembangkitan
             Wisesa                    listrik/Trading
             (“MSW”)                   and power
                                       plant services

          PT Puradika Bongkar        Jasa/Services            Indonesia                 2013                    100%           100%           9,358            11,415
             Muat Makmur
             (“PBMM”)

          PT Rehabilitasi            Jasa/Services            Indonesia                 2016                    100%           100%          13,654            13,095
             Lingkungan
             Indonesia (“RLI”) a)

          PT Indonesia Multi         Jasa pengelolaan         Indonesia                 2013                    100%           100%          10,074             7,999
             Purpose                   terminal/
             Terminal (“IMPT”)         Terminal
                                       handling service

          PT Mustika Indah           Pertambangan/            Indonesia                 2019                     75%            75%         208,790           195,147
             Permai (“MIP”)            Mining

          PT Bukit Enim              Pertambangan/            Indonesia                    -                     61%            61%           1,364             1,319
             Energi (“BEE”)            Mining

          PT Adaro Mining            Jasa/Services            Indonesia                 2023                    100%           100%          75,565            53,089
             Technologies
             (“AMT”) a)

          PT Adaro Jasabara          Jasa/Services            Indonesia                 2007                    100%           100%           5,887             5,712
             Indonesia
             (“AJI”)

          PT Adaro Tirta             Perdagangan/             Indonesia                    -                    100%           100%          83,925            72,229
             Mandiri (“ATM”) a)        Trading

          PT Agri Multi Lestari      Peternakan/              Indonesia                   2016                  100%           100%           5,267             5,925
             (“AML”)                   Farming

          PT Paramitha Cipta         Pertambangan/            Indonesia                    -                     75%            75%          56,927            52,586
             Sarana (“PCS”)            Mining

          PT Semesta                 Pertambangan/            Indonesia                   2014                   75%            75%         203,601           198,730
             Centramas (“SCM”)         Mining

          PT Laskar Semesta          Pertambangan/            Indonesia                   2016                   75%            75%         253,389           266,529
             Alam (“LSA”)              Mining

          PT Adaro Tirta             Investasi dan jasa/      Indonesia                   2021                  100%           100%          33,049            21,966
             Sarana (“ATS”) a)          Investment and
                                        services

          PT Drupadi Tirta           Pengolahan air/          Indonesia                   2016                  100%           100%           7,988             7,202
             Intan (“DTI”)             Water treatment

          PT Adaro Tirta              Pengolahan air/         Indonesia                   2016                  100%           100%          10,737             9,920
             Gresik (“ATG”)             Water treatment

          PT Lahai Coal (“LC”)       Pertambangan/            Indonesia                   2016                   84%            84%          81,474            76,196
                                       Mining

          PT Pari Coal (“PC”)        Pertambangan/            Indonesia                    -                     65%           100%           9,771             5,525
                                       Mining
Page 17
                                               PT ADARO ENERGY INDONESIA Tbk
                                          DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                               Lampiran 5/5 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                                            30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                                                         (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                                                  unless otherwise stated)

1.   UMUM (lanjutan)                                                                1.          GENERAL (continued)
     b.   Struktur grup (lanjutan)                                                              b.       Group structure (continued)
                                                                                 Mulai beroperasi
                                         Kegiatan                                   komersial/                   Persentase                      Total aset
                                          usaha/                                 Commencement                kepemilikan efektif/          (sebelum eliminasi)/
                                         Business           Kedudukan/            of commercial            Effective percentage of              Total assets
                                          activity           Domicile               operations                    ownership                 (before elimination)
                                                                                                                         31 Desember/                   31 Desember/
                                                                                                         30 September     December    30 September       December
                                                                                                             2023            2022         2023              2022

          Entitas anak melalui kepemilikan tidak langsung/Indirectly owned subsidiaries (lanjutan/continued)
          PT Juloi Coal (“JC”)       Pertambangan/            Indonesia                   -                      84%            84%          27,397            13,865
                                       Mining

          PT Sumber Barito           Pertambangan/            Indonesia                   -                      84%            84%           2,581             2,305
             Coal (“SBC”)              Mining

          PT Kalteng Coal (“KC”)     Pertambangan/            Indonesia                   -                      84%            84%           2,497             2,644
                                       Mining
          PT Maruwai Coal (“MC”)     Pertambangan/            Indonesia                  2020                    84%            84%       1,047,360           945,006
                                       Mining
          PT Ratah Coal (“RC”)       Pertambangan/            Indonesia                   -                     100%           100%             209               177
                                       Mining
          PT Balangan Anugerah       Pertambangan/            Indonesia                   -                      75%            75%             106               105
             Semesta (“BAS”)           Mining

          Adaro Capital              Investasi/               Malaysia                   2017                    90%            90%         829,138           834,779
            Limited (“ACL”)             Investment
          PT Alam Sukses Lestari     Kehutanan/               Indonesia                  2018                   100%           100%           2,441             2,538
             (“ASL”)                   Forestry

          PT Barito Galangan         Pembuatan,               Indonesia                  2018                   100%           100%          16,312            13,382
             Nusantara (“BGN”)         perbaikan dan
                                       perawatan
                                       angkutan laut/
                                       Manufacture,
                                       repair and
                                       maintenance of
                                       sea transportation

          PT Hutan Amanah            Kehutanan/               Indonesia                  2018                    85%            85%           1,012             1,322
             Lestari (“HAL”)           Forestry
          PT Adaro Tirta             Pengolahan air/          Indonesia                  2021                    90%            90%           6,865             6,389
             Mentaya (“ATME”)          Water treatment

          PT Adaro Wamco             Pengolahan air           Indonesia                  2019                    60%            60%          12,513            11,725
             Prima (“AWP”)             dan lumpur/
                                       Water and mud
                                       treatment
          Adaro Australia Pty Ltd    Investasi/               Australia                   -                      90%            90%             573               444
                                        Investment

          PT Alam Tri Daya           Investasi/               Indonesia                   -                      84%            84%       1,145,582         1,019,620
             Indonesia (“ATDI”) a)      Investment
          PT Sarana Mekar             Investasi/              Indonesia                   -                      55%            55%          14,053            21,166
             Pratama (“SMP”) a)          Investment

          PT Adaro Indo              Investasi/               Indonesia                   -                      84%            84%         282,625           149,682
             Aluminium (“AIA”) a)       Investment
          PT Sarana Multi            Jasa/Services            Indonesia                  2022                   100%           100%           2,930             2,856
             Talenta (“SMT”)

          PT Batam Surya             Investasi/               Indonesia                   -                      65%           100%           3,438             2,594
             Energi (“BSE”) a)          Investment
          PT Batam Sarana            Penyediaan tenaga        Indonesia                   -                      65%           100%           3,412             2,582
             Surya (“BSS”)             listrik/Electric
                                       power supply
          PT Karimun Sarana          Penyediaan tenaga        Indonesia                   -                      90%           100%           2,732             2,229
             Surya (“KSS”)             listrik/Electric
                                       power supply
          PT Persada Wana            Kehutanan/               Indonesia                   -                     100%           100%              17                17
             Lestari (“PWL”)           Forestry

          PT Cakra Wana              Kehutanan/               Indonesia                   -                     100%           100%             322               316
             Lestari (“CWL”)           Forestry

          PT Mandiri Wana            Kehutanan/               Indonesia                   -                     100%           100%              17                17
             Lestari (“MWL”)           Forestry
          PT Adaro Tirta             Jasa penunjang           Indonesia                  2023                   100%           100%           1,738               428
             Wening (“ATW”)            pengelolaan air/
                                       Water
                                       management
                                       support services

          PT Kalimantan              Pengolahan logam/        Indonesia                   -                      54%            84%         278,143           144,459
             Aluminium                 Metal
             Industry (“KAI”)          processing

          PT Kaltara Power           Penyediaan tenaga        Indonesia                   -                      84%            90%         307,679           233,899
             Indonesia (“KPI”)         listrik/Electric
                                       power supply
Page 18
                                                 PT ADARO ENERGY INDONESIA Tbk
                                            DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                                  Lampiran 5/6 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                                            30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                                                         (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                                                  unless otherwise stated)

1.   UMUM (lanjutan)                                                                1.         GENERAL (continued)

     b.   Struktur grup (lanjutan)                                                             b.        Group structure (continued)
                                                                                 Mulai beroperasi
                                            Kegiatan                                komersial/                   Persentase                      Total aset
                                             usaha/                              Commencement                kepemilikan efektif/          (sebelum eliminasi)/
                                            Business            Kedudukan/        of commercial            Effective percentage of              Total assets
                                             activity            Domicile           operations                    ownership                 (before elimination)
                                                                                                                         31 Desember/                   31 Desember/
                                                                                                         30 September     December    30 September       December
                                                                                                             2023            2022         2023              2022

          Entitas anak melalui kepemilikan tidak langsung/Indirectly owned subsidiaries (lanjutan/continued)

          Adaro Solar                   Transmisi, distribusi    Singapura/               -                     100%           100%              89                66
            International Pte. Ltd.       dan penjualan           Singapore
            (“ASIN”)                      tenaga listrik/
                                          Transmission,
                                          distribution and
                                          sale of electricity

          PT Adaro Tirta                Pengolahan air/          Indonesia                -                     100%           100%           3,224               640
             Brayan (“ATB”)               Water treatment

          PT Kalimantan Energi          Investasi/               Indonesia                -                     100%           100%          72,310            70,480
             Hijau (“KEH”) a)              Investment

          PT Pembangkit                 Penyedia tenaga          Indonesia                -                     100%           100%              18                19
             Indonesia                    listrik/Electric
             Alfa (“PIA”)                 power supply

          PT Pembangkit                 Penyedia tenaga          Indonesia                -                     100%           100%               6                14
             Indonesia                    listrik/Electric
             Gamma (“PIG”)                power supply

          PT Pembangkit                 Penyedia tenaga          Indonesia                -                     100%           100%              76                74
             Indonesia                    listrik/Electric
             Delta (“PID”)                power supply

          PT Pembangkit                 Penyedia tenaga          Indonesia                -                     100%           100%             642               245
             Indonesia Eta                listrik/Electric
             (“PIEta”)                    power supply

          PT Pembangkit                 Penyedia tenaga          Indonesia                -                     100%           100%           2,017               792
             Indonesia                    listrik/Electric
             Epsilon (“PIEps”)            power supply

          PT Pembangkit                 Penyedia tenaga          Indonesia                -                     100%           100%               6                14
             Indonesia                    listrik/Electric
             Zeta (“PIZ”)                 power supply

          PT Mentarang Tirta            Investasi/               Indonesia                -                     100%           100%          59,188            58,202
             Energi (“MTE”)                Investment

          PT Adaro Baterai              Investasi/               Indonesia                -                      84%            84%         287,877           154,738
             Indonesia (“ABI”) a)          Investment

          PT Karimun Industri           Investasi/               Indonesia                -                      90%            90%           2,744                25
             Surya Semesta                 Investment
             (“KISS”) a)

          PT Adaro Sarana Energi Penyedia tenaga                 Indonesia                -                     100%                -             7                    -
             Terbarukan (“ASET”) b) listrik/Electric
                                    power supply

          PT Indoprima Niaga            Investasi/               Indonesia                -                      65%                -        12,942                    -
             Sejahtera (“INS”) a), c)      Investment

          PT Indotama Semesta           Jasa pertambangan/       Indonesia                -                      65%                -         8,954                    -
             Manunggal                    Mining services
              (“INDOTAMA”) c)

          PT Indovisi Sentosa           Kepelabuhan/             Indonesia                -                      65%                -         1,677                    -
             Mandiri (“ISM”) c)           Port

          PT Mitra Rimba                Usaha kehutanan/         Indonesia                -                      65%                -           149                    -
             Indoprima (“MRI”) c)         Forestry business

          PT Indo Mitra                 Jasa pertambangan/       Indonesia                -                      65%                -           156                    -
             Konstruksi (“IMK”) c)        Mining services

          PT Adaro Wind                 Investasi/               Indonesia                -                     100%                -            12                    -
             Energy (“AWE”) b)             Investment

          PT Jaringan Interkoneksi      Transmisi tenaga         Indonesia                -                     100%                -            12                    -
             Karimun Abadi                listrik/Electricity
             (“JIKA”) b)                  transmission

          PT Jaringan Interkoneksi      Transmisi tenaga         Indonesia                -                     100%                -            12                    -
             Batam Abadi                  listrik/Electricity
             (“JIBA”) b)                  transmission

          a) dan entitas anaknya/and its subsidiaries
          b) didirikan pada tahun 2023/established in 2023
          c) diakuisisi pada tahun 2023/acquired in 2023
Page 19
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/7 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                           NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                 FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                             30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                          (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                   unless otherwise stated)

1.   UMUM (lanjutan)                                         1.   GENERAL (continued)

     c.   IUPK    sebagai    Kelanjutan          Operasi          c.   IUPK     for  the    Continuation            of
          Kontrak/Perjanjian                                           Contract/Agreement Operation

          Kegiatan AI berdasarkan Perjanjian Karya                     AI’s activities were governed by the provisions
          Pengusahaan        Pertambangan   Batubara                   of a Coal Cooperation Agreement (the “CCA”)
          (“PKP2B”) antara AI dan PT Tambang                           which was entered into by AI and
          Batubara Bukit Asam (Persero) Tbk (“PTBA”),                  PT Tambang Batubara Bukit Asam (Persero)
          dahulu Perusahaan Negara Tambang                             Tbk (“PTBA”), formerly Perusahaan Negara
          Batubara, tertanggal 16 November 1982.                       Tambang Batubara, on 16 November 1982.
          Berdasarkan Keputusan Presiden No.                           Based on Presidential Decree No. 75/1996
          75/1996, tertanggal 25 September 1996 dan                    dated 25 September 1996 and the
          perubahan PKP2B No. J2/Ji.DU/52/82 antara                    amendment to CCA No. J2/Ji.DU/52/82
          PTBA dan AI tertanggal 27 Juni 1997, semua                   between PTBA and AI on 27 June 1997, all of
          hak dan kewajiban PTBA dalam PKP2B                           the rights and obligations of PTBA under the
          dialihkan kepada Pemerintah Republik                         CCA were transferred to the Government of
          Indonesia (“Pemerintah”) yang diwakili oleh                  the Republic of Indonesia (the “Government”)
          Menteri Pertambangan dan Energi, efektif                     represented by the Minister of Mines and
          sejak 1 Juli 1997.                                           Energy, effective from 1 July 1997.

          Berdasarkan      ketentuan       PKP2B,       AI             Under the terms of the CCA, AI acts as a
          merupakan kontraktor Pemerintah yang                         contractor to the Government, and is
          bertanggung       jawab       atas       operasi             responsible for coal mining operations in an
          penambangan batubara di area yang                            area located in South Kalimantan. AI
          berlokasi di Kalimantan Selatan. AI memulai                  commenced its 30-year operating period
          periode operasi 30 tahunnya (kecuali                         (unless extended based on the terms and
          diperpanjang berdasarkan persyaratan dan                     conditions      in    the      CCA)       on
          ketentuan dalam PKP2B) pada tanggal                          1 October 1992 with coal produced from the
          1 Oktober 1992 dengan memproduksi                            Paringin area of interest. AI is entitled to
          batubara di area of interest Paringin. AI berhak             86.5% of the coal produced, with the
          atas 86,5% batubara yang diproduksi dan                      remaining     13.5%      representing    the
          13,5%      sisanya       merupakan        bagian             Government’s share of production.
          Pemerintah.

          Pada tanggal 18 September 2014, AI telah                     On 18 September 2014, AI signed a
          menandatangani Nota Kesepahaman (“MoU”)                      Memorandum of Understanding (“MoU”) with
          dengan Pemerintah untuk memperbarui                          the Government to amend its CCA. This MoU
          PKP2B AI. MoU ini ditandatangani dalam                       was signed within the framework of the
          rangka proses renegosiasi penyesuaian                        renegotiation process for adjustment of the
          PKP2B, yang hanya berkaitan dengan enam                      CCA, which only related to six strategic
          isu strategis yaitu: (i) Wilayah PKP2B,                      issues: (i) the CCA area, (ii) the continuation
          (ii) Kelanjutan Operasi Pertambangan,                        of Mining Operations, (iii) State Revenue,
          (iii) Penerimaan Negara, (iv) Kewajiban                      (iv) Obligations of Domestic Processing,
          Pengolahan Dalam Negeri, (v) Kewajiban                       (v) Obligations to Divest, and (vi) Use of Local
          Divestasi, dan (vi) Penggunaan Tenaga Kerja                  Labour, Goods and Domestic Services.
          Lokal, Barang-Barang, dan Jasa Dalam
          Negeri.
Page 20
                                   PT ADARO ENERGY INDONESIA Tbk
                              DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                             Lampiran 5/8 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                             (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                      unless otherwise stated)

1.   UMUM (lanjutan)                                        1.   GENERAL (continued)

     c.   IUPK    sebagai      Kelanjutan       Operasi          c.       IUPK     for  the    Continuation     of
          Kontrak/Perjanjian (lanjutan)                                   Contract/Agreement Operation (continued)

          Pada tanggal 17 Januari 2018, AI telah                          On 17 January 2018, AI signed an
          menandatangani amandemen PKP2B dengan                           amendment to the CCA (“Amendment to the
          Pemerintah     (“Amandemen       PKP2B”).                       CCA”) with the Government. This amendment
          Amandemen ini ditandatangan dengan tujuan                       was signed for the purpose of adjusting the
          untuk menyesuaikan ketentuan PKP2B untuk                        provisions of the CCA to comply with the
          memenuhi Undang-undang No. 4 Tahun 2009                         provisions of Law No. 4 of 2009 on Mineral
          tentang Pertambangan Mineral dan Batubara                       and Coal Mining pursuant to the requirements
          sesuai dengan persyaratan sebagaimana                           as set forth in Article 169 of the said law.
          dimaksud dalam Pasal 169.

          Pada bulan Juli 2021, AI telah mengajukan                       In July 2021, AI submitted the application for
          permohonan           kelanjutan        operasi                  the continuation of AI’s mining operation
          pertambangan AI dalam bentuk Izin Usaha                         under a Special Mining Business Permit for
          Pertambangan Khusus sebagai Kelanjutan                          the Continuation of Contract/Agreement
          Operasi Kontrak/Perjanjian (“IUPK sebagai                       Operation (“IUPK for the Continuation of
          Kelanjutan     Operasi     Kontrak/Perjanjian”)                 Contract/Agreement Operation”) together with
          disertai dengan persyaratan administratif,                      the required administrative, technical,
          teknis, finansial, dan persyaratan lingkungan                   financial, and environmental requirements to
          yang diperlukan kepada otoritas Pemerintah                      the relevant Government authority.
          terkait.

          AI telah menerima IUPK sebagai Kelanjutan                       AI has received an IUPK for the Continuation
          Operasi Kontrak/Perjanjian yang diterbitkan                     of Contract/Agreement Operation issued by
          oleh    Menteri   Investasi/Kepala      Badan                   the Minister of Investment/Chairman of the
          Koordinasi Penanaman Modal Republik                             Investment Coordinating Board of the
          Indonesia atas nama Menteri Energi dan                          Republic of Indonesia on behalf of the Minister
          Sumber      Daya      Mineral       tertanggal                  of Energy and Mineral Resources dated
          13 September 2022. IUPK sebagai Kelanjutan                      13 September 2022. The IUPK for the
          Operasi Kontrak/Perjanjian ini telah diberikan                  Continuation      of     Contract/Agreement
          untuk jangka waktu yang berakhir pada                           Operation has been granted for a period
          tanggal 1 Oktober 2032, yang dapat                              expiring on 1 October 2032, which can be
          diperpanjang sesuai dengan ketentuan                            extended in accordance with the prevailing
          peraturan perundang-undangan yang berlaku.                      regulations.

          Berdasarkan IUPK sebagai Kelanjutan                             In accordance with the IUPK for the
          Operasi      Kontrak/Perjanjian,    beberapa                    Continuation       of     Contract/Agreement
          ketentuan perpajakan dan Penerimaan                             Operation, some provisions for taxes and
          Negara Bukan Pajak (“PNBP”) berdasarkan                         Non-Tax State Revenue (“PNBP”) under the
          PKP2B sebelumnya masih berlaku sampai                           CCA were in force until the end of the 2022
          akhir tahun fiskal 2022, termasuk iuran tetap,                  fiscal year, including dead rent, withholding
          pemotongan dan pemungutan pajak, bea                            and collection tax, stamp duty, import duties,
          meterai, bea masuk dan cukai, royalti sebesar                   royalties of 13.5% and other PNBP, Corporate
          13,5%, dan PNBP lainnya, Pajak Penghasilan                      Income Tax (“CIT”) of 45%, land and building
          Badan (“PPh Badan”) sebesar 45%, pajak                          tax and other regional taxes paid in a lump
          bumi dan bangunan serta pajak daerah                            sum and sales tax. Vehicle fuel tax (“PBBKB”)
          lainnya dibayarkan sekaligus dan pajak                          can also continue to be offset against the
          penjualan. Pajak Bahan Bakar Kendaraan                          Government’s share.
          Bermotor (“PBBKB”) dapat berlanjut untuk
          dikompensasikan         terhadap       bagian
          Pemerintah.
Page 21
                                  PT ADARO ENERGY INDONESIA Tbk
                             DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                            Lampiran 5/9 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                  FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                              30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                           (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                    unless otherwise stated)

1.   UMUM (lanjutan)                                      1.   GENERAL (continued)

     c.   IUPK    sebagai      Kelanjutan     Operasi          c.        IUPK     for  the    Continuation     of
          Kontrak/Perjanjian (lanjutan)                                  Contract/Agreement Operation (continued)

          Mulai 1 Januari 2023, ketentuan perpajakan                     Starting 1 January 2023, the provisions on
          dan/atau PNBP dilaksanakan sesuai dengan                       taxation and/or PNBP are implemented in
          ketentuan yang berlaku (Catatan 39o).                          accordance with the prevailing regulations
                                                                         (Note 39o).

          Pendapatan      AI    mencerminkan       100%                  AI’s sales reflect 100% of the revenue
          penjualan batubara. Beban royalti kepada                       generated from coal sales. The Government
          Pemerintah disajikan sebagai bagian dari                       royalty expense is presented as part of the
          beban pokok penjualan dalam laporan laba                       cost of sales in the interim consolidated
          rugi konsolidasian interim (Catatan 30).                       statements of profit or loss (Note 30).

     d.    Perjanjian Kerjasama IBT                                 d.   IBT Cooperation Agreement

          Pada tanggal 25 Agustus 1990, IBT                              On 25 August 1990, IBT entered into a Basic
          mengadakan Perjanjian Dasar dengan                             Agreement with PT Pelabuhan Indonesia III
          PT Pelabuhan Indonesia III (Persero) (dahulu                   (Persero) (formerly Perum Pelabuhan III)
          Perum Pelabuhan III) (“Pelindo III”) untuk                     (“Pelindo   III”)  for   the   construction,
          pembangunan,        pengembangan,       dan                    development and operation of a Public Coal
          pengelolaan Pelabuhan Umum Batubara di                         Port in Pulau Laut, South Kalimantan.
          Pulau Laut, Kalimantan Selatan. Pada tanggal                   On 10 November 1994, IBT and PT
          10 November 1994, IBT dan PT Pelabuhan                         Pelabuhan Indonesia (Persero) (“Pelindo”)
          Indonesia (Persero) (“Pelindo”) (dahulu                        (formerly Pelindo III) amended the Basic
          Pelindo III) mengubah Perjanjian Dasar                         Agreement to a Cooperation Agreement
          menjadi Perjanjian Kerjasama (“Perjanjian”).                   (“Agreement”). Under the terms of the
          Berdasarkan Perjanjian, IBT memulai periode                    Agreement, IBT commenced its 30-year
          operasi 30 tahunnya pada tanggal 21 Agustus                    operating period on 21 August 1997.
          1997.

          Perjanjian ini telah mengalami beberapa kali                   This agreement has been amended several
          perubahan, antara lain terkait dengan                          times, this includes amendments related to
          perubahan royalti atau pembagian imbalan                       changes in royalties or the share of handling
          atas jasa pengelolaan terminal curah batubara                  fees for the management of the coal bulk
          dan terminal curah cair, serta perubahan                       terminal services and liquid bulk terminal
          terakhir pada tanggal 13 November 2020,                        services, and also the latest amendment,
          dimana sebagian aset IBT berdasarkan                           made on 13 November 2020, wherein certain
          Perjanjian akan dialihkan menjadi milik                        assets of IBT outlined by the Agreement will
          Pelindo setelah berakhirnya jangka waktu                       become the property of Pelindo upon the
          Perjanjian.                                                    expiration of the Agreement.

          Pada tanggal 6 Desember 2022, IBT, Pelindo                     On 6 December 2022, IBT, Pelindo and PT
          dan PT Pelindo Multi Terminal (“PMT”) telah                    Pelindo Multi Terminal (“PMT”) signed the
          menandatangani Perjanjian Novasi Sebagian                      Partial Novation Agreement of the Agreement,
          atas Perjanjian, sehubungan dengan seluruh                     wherein all of Pelindo’s authorities, rights,
          tanggung jawab, hak dan kewajiban Pelindo                      obligations and responsibilities relating to
          atas share handling fees dan jasa dermaga                      share handling fees and dock services under
          berdasarkan Perjanjian ini dialihkan kepada                    the Agreement are transferred to PMT.
          PMT.
Page 22
                                   PT ADARO ENERGY INDONESIA Tbk
                              DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                           Lampiran 5/10 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                         NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                               FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                           30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                        (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                 unless otherwise stated)

1.   UMUM (lanjutan)                                       1.    GENERAL (continued)

     d.   Perjanjian Kerjasama IBT (lanjutan)                        d.   IBT Cooperation Agreement (continued)

          Pada tanggal 4 Januari 2023, IBT dan PMT                        On 4 January 2023, IBT and PMT entered into
          menandatangani       Perjanjian        Dasar                    Heads of Agreement in relation to the
          sehubungan dengan rencana pengembangan                          development plan of cooperation in the
          kerja sama pengoperasian fasilitas terminal di                  operations of terminal facilities at Mekar Putih
          Pelabuhan Mekar Putih, Pulau Laut,                              Port, Pulau Laut, South Kalimantan.
          Kalimantan Selatan.

          Pada tanggal 25 Mei 2023, telah                                 On 25 May 2023, the Deed of Share Purchase
          ditandatangani Akta Jual Beli Saham antara                      was signed between IBT and PMT, in relation
          IBT dan PMT, sehubungan dengan pembelian                        to the purchase of a 49% share in PT Terminal
          49% saham oleh IBT di Terminal Curah Utama                      Curah Utama (“TCU”) by IBT.
          (“TCU”).

          Pada tanggal 26 Juni 2023, IBT dan TCU                          On 26 June 2023, IBT and TCU signed a
          menandatangani Perjanjian Pemeliharaan                          Terminal Maintenance Agreement for the
          Terminal Bahan Bakar Pulau Laut, dimana                         Pulau Laut Fuel Terminal, whereas TCU has
          TCU memiliki tugas dan kewajiban untuk                          the responsibility and obligation to maintain
          memelihara fasilitas terminal bahan bakar di                    the terminal fuel facilities in Mekar Putih Port.
          Pelabuhan Mekar Putih.

     e.   Perjanjian Kerjasama Pengelolaan Alur                 e.        Ambang Barito Channel             Management
          Ambang Barito                                                   Cooperation Agreement

          Pada tanggal 28 Agustus 2007, PT Ambang                         On 28 August 2007, PT Ambang Barito
          Barito        Nusapersada        (“Ambapers”)                   Nusapersada (“Ambapers”) appointed SDM
          menetapkan SDM sebagai pemenang tender                          as a partnership tender winner to execute the
          mitra kerja sama untuk melaksanakan                             dredging of the Ambang Barito Channel,
          pengerukan Alur Ambang Barito, termasuk                         which      includes     river-mouth    dredging,
          pengerukan mulut sungai, perawatan, dan                         maintenance dredging and financing of the
          pembiayaan proyek pengerukan alur tersebut.                     channel dredging project. On 25 March 2008,
          Pada tanggal 25 Maret 2008, SDM                                 SDM entered into an Ambang Barito Channel
          mengadakan           Perjanjian     Kerjasama                   Management Cooperation Agreement with
          Pengelolaan Alur Ambang Barito dengan                           Ambapers to execute this appointment. The
          Ambapers untuk melaksanakan penunjukkan                         term of the agreement is 15 years
          ini. Jangka waktu perjanjian adalah 15 tahun                    commencing on the date on which the channel
          terhitung sejak tanggal dimana biaya jasa                       utilisation service fee is charged by Ambapers
          utilisasi alur ditagihkan oleh Ambapers pada                    on 1 January 2009. Afterwards, SDM will be
          tanggal 1 Januari 2009. Selanjutnya, SDM                        given the first right to consider extension or
          diberi hak pertama untuk mempertimbangkan                       refusal to extend for the next five years. On
          perpanjangan atau penolakan perpanjangan                        25 April 2022, SDM and Ambapers signed
          kerjasama untuk lima tahun berikutnya. Pada                     Amendment I to the Ambang Barito Channel
          tanggal 25 April 2022, SDM dan Ambapers                         Management Cooperation Agreement to
          telah     menandatangani       Amandemen     I                  extend the term of the agreement for the next
          Perjanjian Kerjasama Pengelolaan Alur                           five years, therefore the agreement shall
          Ambang Barito untuk memperpanjang jangka                        expire on 1 January 2029.
          waktu kerjasama untuk lima tahun berikutnya,
          sehingga jangka waktu perjanjian akan
          berakhir pada tanggal 1 Januari 2029.
Page 23
                                            PT ADARO ENERGY INDONESIA Tbk
                                       DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                           Lampiran 5/11 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                      FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                                  30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                                               (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                                        unless otherwise stated)

1.    UMUM (lanjutan)                                                      1.       GENERAL (continued)

     e.    Perjanjian Kerjasama Pengelolaan Alur                                   e.         Ambang Barito Channel Management
           Ambang Barito (lanjutan)                                                           Cooperation Agreement (continued)

           Ambapers mengenakan pungutan jasa alur                                             Ambapers charges a channel fee for every
           untuk setiap kapal yang melalui Alur Ambang                                        ship that passes through the Ambang Barito
           Barito berdasarkan peraturan yang ditetapkan                                       Channel in accordance with the regulations
           oleh pemerintah daerah. Pendapatan dari                                            set by the local government. Revenue from
           pengelolaan alur ini dibagi antara pemerintah                                      the management of channel fees is distributed
           daerah, Ambapers, dan SDM berdasarkan                                              to the local government, Ambapers and SDM
           proporsi yang telah ditetapkan.                                                    in the determined proportions.

     f.    Perjanjian     Karya   Pengusahaan                                      f.         Adaro MetCoal (“AMC”), PC and RC Coal
           Pertambangan Batubara Adaro MetCoal                                                Contracts of Work (“CCoWs”)
           (“AMC”), PC dan RC

           LC, JC, KC, MC dan SBC (secara keseluruhan                                        LC, JC, KC, MC and SBC (collectively referred
           dirujuk sebagai “entitas AMC”) serta PC dan                                       to as the “AMC entities”) and also PC and RC
           RC telah menandatangani PKP2B dengan                                              have entered into CCoWs with the
           Pemerintah untuk melakukan kegiatan                                               Government to conduct coal mining activities
           pengusahaan       pertambangan      batubara                                      as follows:
           sebagai berikut:

                                                                                   Tahun perolehan
                                                                                    surat keputusan
                                                                                                            Periode
                                                                                       peningkatan
                                                                  Luas wilayah                             permulaan
                                                      Tanggal                        tahap kegiatan
                                   Tanggal                             (tidak                                operasi
                    Perusaha                        amandemen/                         operasi dari
                                  perjanjian/                      diaudit)/Area                          penambanga
             No.       an/                          Amendment                         KESDM*)/ The                                  Lokasi/Location
                                  Agreement                         (unaudited)                                 n/
                    Company                            date                        year of obtaining
                                     date                         (Hektar/Hecta                           Commencem
                                                                                   decision letter for
                                                                         re)                              ent of mining
                                                                                        production
                                                                                                           operations
                                                                                    operation stage
                                                                                     from MoEMR*)
                                                                                                      -                     Kalimantan Timur dan Kalimantan
                                                    14 November
              1     PC            19 April 1999                          38,040                                        -       Tengah/East Kalimantan and
                                                        2017
                                                                                                                               Central Kalimantan
                                                                                                      -                     Kalimantan Timur dan Kalimantan
                                  6 September       14 November
              2     RC                                                   36,490                                        -       Tengah/East Kalimantan and
                                     2000               2017
                                                                                                                               Central Kalimantan
                                                                                                                            Kalimantan Timur dan Kalimantan
                                  6 September       14 November
              3     LC                                                   46,620                  2015              2016        Tengah/East Kalimantan and
                                     2000               2017
                                                                                                                               Central Kalimantan
                                  6 September       14 November                                  2020                  -    Kalimantan Tengah/Central
              4     JC                                                   24,988
                                     2000               2017                                                                     Kalimantan
                                  19 Februari/      14 November                                  2020                  -    Kalimantan Tengah/Central
              5     KC                                                   24,988
                                 February 1998          2017                                                                     Kalimantan
                                                                                                                            Kalimantan Timur dan Kalimantan
                                  19 Februari/      14 November
              6     MC                                                   24,990                  2017              2019         Tengah/East Kalimantan and
                                 February 1998          2017
                                                                                                                                Central Kalimantan
                                                    14 November                                  2020                  -    Kalimantan Tengah/Central
              7     SBC           19 April 1999                          24,993
                                                        2017                                                                   Kalimantan

           *) Kementerian Energi dan Sumber Daya Mineral                                    *) Ministry of Energy and Mineral Resources


           Berdasarkan PKP2B tersebut, periode                                              Based on the CCoWs, the operating period of
           operasi      wilayah     pertambangan     akan                                   the relevant areas of interest is for a 30-year
           berlangsung selama 30 tahun dari permulaan                                       period from the first coal mining operation, or a
           operasi penambangan yang pertama, atau                                           longer period agreed by the Government based
           periode yang lebih lama yang dapat disetujui                                     on the written requests from the AMC entities,
           oleh Pemerintah berdasarkan permohonan                                           PC or RC.
           tertulis dari entitas-entitas AMC, PC atau RC.
Page 24
                                            PT ADARO ENERGY INDONESIA Tbk
                                       DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                            Lampiran 5/12 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                           NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                 FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                                             30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                                                          (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                                                   unless otherwise stated)

1.   UMUM (lanjutan)                                                            1.            GENERAL (continued)

     g.   Izin Usaha Pertambangan                                                             g.       Mining Business Permits

          Pada tanggal 30 September 2023 dan                                                            As at 30 September 2023 and 31 December
          31 Desember 2022, selain IUPK sebagai                                                         2022, other than the IUPK for the Continuation
          Kelanjutan Operasi Kontrak/Perjanjian yang                                                    of Contract/Agreement Operation entered into
          dimiliki oleh AI dan PKP2B yang dimiliki setiap                                               by AI and the CCoWs entered into by the AMC
          entitas AMC, PC dan RC, Grup memiliki izin                                                    entities, PC and RC, the Group had the
          usaha pertambangan sebagai berikut:                                                           following mining business permits:

                                      Surat Keputusan/Decree                              Izin/Permit
                                                                                                               Periode/      Luas wilayah
                                                                                                                Period      (tidak diaudit)/
                                                                                                                                                   Lokasi/Location
                                                                                     Jenis/        Pemegang/   (Tahun/     Area (unaudited)
              No.      Nomor/Number         Tanggal/Date          Oleh/By
                                                                                     Type            Holder     Years)     (Hektar/Hectare)



               1     No. 503/188/KEP/       29 April 2010     Bupati Lahat/        IUPOP              MIP        20                      2,000     Kabupaten Lahat,
                     PERTAMBEN/2010                           Regent of Lahat                                                                      Provinsi Sumatera
                                                                                                                                                   Selatan/Lahat
                                                                                                                                                   Regency, South
                                                                                                                                                   Sumatera
                                                                                                                                                   Province


               2     No. 256/KPTS/          9 Maret/          Bupati Muara         IUPOP             BEE         20                     11,130     Kabupaten Muara
                     TAMBEN/2011            March 2011        Enim/Regent of                                                                       Enim, Provinsi
                                                              Muara Enim                                                                           Sumatera
                                                                                                                                                   Selatan/Muara
                                                                                                                                                   Enim Regency,
                                                                                                                                                   South Sumatera
                                                                                                                                                   Province


               3     No. 0466 K/30/         12 Februari/      KESDM/MoEMR          IUPOP             PCS          20                     2,500     Kabupaten
                     MEM/2015*              February                                                           sampai                              Balangan, Provinsi
                                            2015                                                               dengan/                             Kalimantan
                                                                                                                 until                             Selatan/Balangan
                                                                                                                2029                               Regency, South
                                                                                                                                                   Kalimantan
                                                                                                                                                   Province


               4     No. 0427 K/30/         10 Februari/      KESDM/MoEMR          IUPOP             SCM          20                     2,500     Kabupaten
                     MEM/2015*              February                                                           sampai                              Balangan, Provinsi
                                            2015                                                               dengan/                             Kalimantan
                                                                                                                 until                             Selatan/Balangan
                                                                                                                2029                               Regency, South
                                                                                                                                                   Kalimantan
                                                                                                                                                   Province


               5     No. 0636 K/30/         24 Februari/      KESDM/MoEMR          IUPOP             LSA          20                     2,500     Kabupaten
                     MEM/2015               February                                                           sampai                              Balangan, Provinsi
                                            2015                                                               dengan/                             Kalimantan
                                                                                                                 until                             Selatan/Balangan
                                                                                                                2034                               Regency, South
                                                                                                                                                   Kalimantan
                                                                                                                                                   Province



          IUPOP: Izin Usaha Pertambangan Operasi dan Produksi/Operation and Production Mining Business Licence
          *IUPOP yang diterbitkan berdasarkan Keputusan Bupati Balangan No. 188.45/83/Kum Tahun 2009 tanggal 8 April 2009 (PCS) dan Keputusan Bupati Balangan
          No. 188.45/131/Kum Tahun 2009 tanggal 21 Juli 2009 (SCM), keduanya disesuaikan dengan keputusan Menteri Energi dan Sumber Daya Mineral (“Menteri ESDM”)
          dalam rangka perubahan status keduanya menjadi Perusahaan Penanaman Modal Asing/IUPOP issued based on Decree of Regent of Balangan No.
          188.45/83/Kum Year 2009 dated 8 April 2009 (PCS) and Decree of Regent of Balangan No. 188.45/131/Kum Year 2009 dated 21 July 2009 (SCM), both adjusted
          in accordance with the decree of the Minister of Energy and Mineral Resources (“Minister of EMR”) due to their change in status to Foreign Capital Investment
          Companies
Page 25
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                            Lampiran 5/13 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                   FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                               30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                            (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                     unless otherwise stated)

2.   KEBIJAKAN AKUNTANSI MATERIAL                          2.   MATERIAL ACCOUNTING POLICIES

     Berikut ini adalah kebijakan akuntansi penting yang        Presented below are the material accounting policies
     diterapkan dalam penyusunan laporan keuangan               adopted in preparing the interim consolidated
     konsolidasian interim Grup. Kebijakan ini telah            financial statements of the Group. These policies
     diaplikasikan secara konsisten terhadap semua              have been consistently applied to all of the periods
     periode yang disajikan, kecuali dinyatakan lain.           presented, unless otherwise stated.

     a.    Dasar penyusunan laporan          keuangan           a.       Basis of preparation of the interim
           konsolidasian interim                                         consolidated financial statements

           Laporan keuangan konsolidasian interim Grup                   The Group’s interim consolidated financial
           telah disusun berdasarkan Pernyataan                          statements have been prepared in conformity
           Standar Akuntansi Keuangan dan Peraturan                      with   Indonesian    Financial  Accounting
           No. VIII.G.7 tentang “Penyajian dan                           Standards and Regulation No. VIII.G.7
           Pengungkapan Laporan Keuangan Emiten                          regarding “Financial Statement Presentation
           atau Perusahaan Publik”.                                      and Disclosures of Issuers or Public
                                                                         Companies”.

           Laporan keuangan konsolidasian interim telah                  The interim consolidated financial statements
           disusun     berdasarkan    konsep       harga                 have been prepared under the historical cost
           perolehan, kecuali untuk aset keuangan                        convention, except for financial assets which
           tertentu yang diakui berdasarkan nilai wajar,                 are recognised at fair value, and using the
           serta menggunakan dasar akrual kecuali                        accrual basis except for the interim
           untuk laporan arus kas konsolidasian interim.                 consolidated statements of cash flows.

           Penyusunan laporan keuangan konsolidasian                     The preparation of interim consolidated
           interim berdasarkan Standar Akuntansi                         financial statements in conformity with
           Keuangan      di   Indonesia   memerlukan                     Indonesian Financial Accounting Standards
           penggunaan estimasi dan asumsi akuntansi                      requires the use of certain critical accounting
           penting tertentu. Penyusunan laporan                          estimates and assumptions. It also requires
           keuangan juga mengharuskan manajemen                          management to exercise its judgement in the
           untuk membuat pertimbangan dalam proses                       process of applying the Group’s accounting
           penerapan kebijakan akuntansi Grup. Area-                     policies. The areas involving a higher degree
           area yang memerlukan tingkat pertimbangan                     of judgement or complexity, or areas where
           yang lebih tinggi atau kompleks, atau area                    assumptions and estimates are significant to
           dimana asumsi dan estimasi yang berdampak                     the interim consolidated financial statements
           signifikan terhadap laporan keuangan                          are disclosed in Note 3.
           konsolidasian interim diungkapkan dalam
           Catatan 3.

     b.    Perubahan pada Pernyataan           Standar          b.       Changes to Statements of Financial
           Akuntansi Keuangan (“PSAK”)                                   Accounting Standards (“SFAS”)

           Penerapan dari amandemen dan revisi                           The adoption of the following amendments
           terhadap standar akuntansi, yang berlaku                      and revision to accounting standards which
           efektif sejak tanggal 1 Januari 2023 tidak                    are effective from 1 January 2023 did not
           menyebabkan perubahan signifikan atas                         result in substantial changes to the Group’s
           kebijakan akuntansi Grup dan tidak                            accounting policies and had no material effect
           memberikan dampak yang material terhadap                      on the amounts reported in the interim
           jumlah yang dilaporkan di laporan keuangan                    consolidated financial statements for the
           konsolidasian interim pada periode berjalan:                  current period:

              Amandemen PSAK No. 1, “Penyajian                             Amendment to SFAS No. 1, “Presentation
               Laporan Keuangan - Klasifikasi Liabilitas                     of Financial Statements - Classification of
               sebagai Jangka Pendek atau Jangka                             Liabilities as Current or Non-Current”
               Panjang”                                                     Amendment to SFAS No. 1, “Presentation
              Amandemen PSAK No. 1, “Penyajian                              of Financial Statements - Disclosure of
               Laporan Keuangan - Pengungkapan                               Accounting Policies”
               Kebijakan Akuntansi”
Page 26
                                   PT ADARO ENERGY INDONESIA Tbk
                              DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                           Lampiran 5/14 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                   FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                               30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                            (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                     unless otherwise stated)

2.   KEBIJAKAN AKUNTANSI MATERIAL (lanjutan)               2.   MATERIAL ACCOUNTING POLICIES (continued)

     b.   Perubahan pada Pernyataan Standar                     b.       Changes to Statements of Financial
          Akuntansi Keuangan (“PSAK”) (lanjutan)                         Accounting Standards (“SFAS”) (continued)

          Penerapan dari amandemen dan revisi                            The adoption of the following amendments
          terhadap standar akuntansi, yang berlaku                       and revision to accounting standards which
          efektif sejak tanggal 1 Januari 2023 tidak                     are effective from 1 January 2023 did not
          menyebabkan perubahan signifikan atas                          result in substantial changes to the Group’s
          kebijakan akuntansi Grup dan tidak                             accounting policies and had no material effect
          memberikan dampak yang material terhadap                       on the amounts reported in the interim
          jumlah yang dilaporkan di laporan keuangan                     consolidated financial statements for the
          konsolidasian interim pada periode berjalan:                   current period: (continued)
          (lanjutan)

             Amandemen PSAK No. 16, “Aset Tetap -                          Amendment to SFAS No. 16, “Property,
              Hasil Sebelum Penggunaan yang                                  Plant and Equipment - Proceeds before
              Diintensikan”                                                  Intended Use”
             Amandemen PSAK No. 25, “Kebijakan                             Amendment to SFAS No. 25, “Accounting
              Akuntansi, Perubahan Estimasi Akuntansi                        Policies,   Changes     in  Accounting
              dan Kesalahan - Definisi Estimasi                              Estimates and Errors - Definition of
              Akuntansi”                                                     Accounting Estimates”
             Amandemen PSAK No. 46, “Pajak                                 Amendments to SFAS No. 46, “Income
              Penghasilan - Pajak Tangguhan terkait                          Taxes - Deferred Tax related to Assets
              Aset dan Liabilitas yang Timbul dari                           and Liabilities arising from a Single
              Transaksi Tunggal”                                             Transaction”
             Revisi PSAK No. 107, “Akuntansi Ijarah”                       Revision to SFAS No. 107, “Ijarah
                                                                             Accounting

          Standar baru, amandemen dan revisi yang                        New standard, amendments and revisions
          telah diterbitkan, namun belum berlaku efektif                 issued but not yet effective for the financial
          untuk tahun buku yang dimulai pada 1 Januari                   year beginning 1 January 2023 are as follows:
          2023 adalah sebagai berikut:

             PSAK No. 74, “Kontrak Asuransi”                               SFAS No. 74, “Insurance Contracts”
             Amandemen PSAK No. 1, “Penyajian                              Amendment to SFAS No. 1, “Presentation
              Laporan Keuangan - Liabilitas Jangka                           of Financial Statements - Non-Current
              Panjang dengan Kovenan”                                        Liabilities with Covenants”
             Amandemen PSAK No. 73, “Sewa -                                Amendment to SFAS No. 73, “Leases -
              Liabilitas Sewa dalam Jual dan Sewa-                           Lease Liability in a Sale and Leaseback”
              Balik”
             Amandemen PSAK No. 74, “Kontrak                               Amendment to SFAS No. 74, “Insurance
              Asuransi tentang Penerapan Awal PSAK                           Contracts regarding Initial Application of
              No. 74 dan PSAK No. 71 - Informasi                             SFAS No. 74 and SFAS No. 71 -
              Komparatif”                                                    Comparative Information”
             Revisi PSAK No. 101, “Penyajian Laporan                       Revision to SFAS No. 101, “Presentation
              Keuangan Syariah”                                              of Sharia Financial Statements”
             Revisi PSAK No. 109, “Akuntansi Zakat,                        Revision to SFAS No. 109, “Zakah, Infaq
              Infak, dan Sedekah”                                            and Sadaqah Accounting”

          Standar baru, amandemen, dan revisi di atas                    The above new standard, amendments and
          berlaku efektif mulai 1 Januari 2024, kecuali                  revisions are effective beginning 1 January
          untuk PSAK No. 74 dan Amandemen PSAK                           2024, except for SFAS No. 74 and
          No. 74 yang berlaku efektif mulai 1 Januari                    Amendment to SFAS No. 74 which are
          2025, tetapi penerapan dini diperkenankan.                     effective beginning 1 January 2025, but early
                                                                         adoption is permitted.
Page 27
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                            Lampiran 5/15 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                             (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                      unless otherwise stated)

2.   KEBIJAKAN AKUNTANSI MATERIAL (lanjutan)                2.   MATERIAL ACCOUNTING POLICIES (continued)

     b.   Perubahan pada Pernyataan Standar                      b.       Changes to Statements of Financial
          Akuntansi Keuangan (“PSAK”) (lanjutan)                          Accounting Standards (“SFAS”) (continued)

          Pada tanggal penyelesaian laporan keuangan                      As at the completion date of these interim
          konsolidasian interim ini, Grup sedang                          consolidated financial statements, the Group
          mempelajari dampak yang mungkin timbul dari                     is evaluating the potential impact of the new
          penerapan standar baru, amandemen dan                           standard, amendments and revisions on the
          revisi pada laporan keuangan konsolidasian                      Group’s     interim  consolidated     financial
          interim Grup.                                                   statements.

     c.   Prinsip-prinsip konsolidasi                            c.       Principles of consolidation

          i.   Entitas anak                                               i.   Subsidiaries

               i.1. Konsolidasi                                                i.1. Consolidation

                   Entitas anak merupakan semua                                    Subsidiaries     are     all   entities
                   entitas (termasuk entitas bertujuan                             (including structured entities) over
                   khusus), dimana Grup memiliki                                   which the Group has control. The
                   pengendalian. Grup mengendalikan                                Group controls an entity when the
                   suatu entitas ketika Grup memiliki                              Group is exposed to, or has rights to,
                   hak atas imbal hasil variabel dari                              variable returns from its involvement
                   keterlibatannya dengan suatu entitas                            with the entity and has the ability to
                   dan memiliki kemampuan untuk                                    affect those returns through its
                   mempengaruhi imbal hasil tersebut                               power over the entity.
                   melalui kekuasaannya atas entitas
                   tersebut.

                   Entitas anak dikonsolidasi sejak                                Subsidiaries are consolidated from
                   tanggal pengendalian beralih kepada                             the date on which control is
                   Grup dan tidak lagi dikonsolidasi                               transferred to the Group and are
                   sejak       tanggal       hilangnya                             de-consolidated from the date on
                   pengendalian.                                                   which that control ceases.

                   Saldo, transaksi, penghasilan, dan                              Intragroup balances, transactions,
                   beban intra kelompok usaha                                      income     and     expenses     are
                   dieliminasi.    Keuntungan      dan                             eliminated. Profits and losses
                   kerugian hasil dari transaksi intra                             resulting      from      intragroup
                   kelompok usaha yang diakui dalam                                transactions that are recognised in
                   aset juga dieliminasi. Kebijakan                                assets are also eliminated. The
                   akuntansi entitas anak telah diubah                             accounting policies of subsidiaries
                   seperlunya     untuk    memastikan                              have     been     amended     where
                   konsistensi penerapan kebijakan                                 necessary to ensure consistency
                   oleh Grup.                                                      with the policies adopted by the
                                                                                   Group.

               i.2. Akuisisi                                                   i.2. Acquisition

                   Grup menerapkan metode akuisisi                                 The Group applies the acquisition
                   untuk mencatat setiap kombinasi                                 method to account for business
                   bisnis. Imbalan yang dialihkan untuk                            combinations. The consideration
                   mengakuisisi entitas anak adalah                                transferred for the acquisition of a
                   nilai wajar seluruh aset yang                                   subsidiary is the fair value of the
                   dialihkan, liabilitas yang diakui oleh                          assets transferred, the liabilities
                   pihak pengakuisisi kepada pemilik                               incurred to the former owners of the
                   sebelumnya dari entitas yang                                    acquiree and the equity interests
                   diakuisisi dan kepentingan ekuitas                              issued by the Group.
                   yang diterbitkan oleh Grup.
Page 28
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                               Lampiran 5/16 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                  NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                        FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                    30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                                 (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                          unless otherwise stated)

2.   KEBIJAKAN AKUNTANSI MATERIAL (lanjutan)                    2.   MATERIAL ACCOUNTING POLICIES (continued)

     c.   Prinsip-prinsip konsolidasi (lanjutan)                     c.       Principles of consolidation (continued)

          i.   Entitas anak (lanjutan)                                        i.   Subsidiaries (continued)

               i.2. Akuisisi (lanjutan)                                            i.2. Acquisition (continued)

                   Imbalan yang dialihkan termasuk nilai                               The       consideration      transferred
                   wajar setiap aset dan liabilitas yang                               includes the fair value of any asset
                   dihasilkan dari suatu kesepakatan                                   or liability resulting from a contingent
                   imbalan          kontinjensi.       Aset                            consideration arrangement. Identifiable
                   teridentifikasi, liabilitas dan liabilitas                          assets acquired, liabilities and
                   kontinjensi yang diambil alih, yang                                 contingent liabilities assumed in a
                   diperoleh dalam kombinasi bisnis                                    business combination are measured
                   diukur pada awalnya sebesar nilai                                   initially at their fair values as at the
                   wajar pada tanggal akuisisi.                                        acquisition date.

                   Grup      mengakui        kepentingan                               The     Group      recognises       any
                   non-pengendali pada pihak yang                                      non-controlling interest in the
                   diakuisisi baik sebesar nilai wajar                                 acquiree on an acquisition-by-
                   atau sebesar bagian proporsional                                    acquisition basis, either at fair value
                   kepentingan non-pengendali atas                                     or at the non-controlling interest’s
                   aset neto teridentifikasi pihak                                     proportionate      share      of    the
                   yang      diakuisisi.     Kepentingan                               acquiree’s identifiable net assets.
                   non-pengendali disajikan di ekuitas                                 Non-controlling       interests     are
                   dalam laporan posisi keuangan                                       reported as equity in the interim
                   konsolidasian interim, terpisah dari                                consolidated statements of financial
                   ekuitas pemilik entitas induk.                                      position, separate from the owners
                                                                                       of the parent entity.

                   Biaya terkait akuisisi dibebankan                                   Acquisition-related   costs         are
                   pada saat terjadinya.                                               expensed as incurred.

                   Jika kombinasi bisnis diperoleh                                     If the business combination is
                   secara     bertahap,     Grup     akan                              achieved in stages, the Group will
                   mengukur kepentingan ekuitas yang                                   remeasure its previously held equity
                   sebelumnya dimiliki pada pihak yang                                 interest in the acquiree at its fair
                   diakuisisi sebesar nilai wajar pada                                 value at its acquisition date and
                   tanggal akuisisi dan mengakui                                       recognise the resulting gain or loss,
                   keuntungan atau kerugian yang                                       if any, in profit or loss. Any
                   dihasilkan, jika ada, dalam laba rugi.                              contingent consideration to be
                   Imbalan kontinjensi yang masih                                      transferred by the Group is
                   harus dialihkan oleh Grup diakui                                    recognised at its fair value as at the
                   sebesar nilai wajar pada tanggal                                    acquisition    date.      Subsequent
                   akuisisi. Perubahan selanjutnya atas                                changes to the fair value of the
                   nilai wajar imbalan kontinjensi yang                                contingent consideration that is
                   diakui sebagai aset atau liabilitas dan                             deemed to be an asset or a liability
                   dicatat dalam laba rugi. Imbalan                                    are recognised in profit or loss. A
                   kontinjensi yang diklasifikasikan                                   contingent consideration that is
                   sebagai ekuitas tidak diukur kembali                                classified   as    equity     is   not
                   dan      penyelesaian      selanjutnya                              remeasured, and its subsequent
                   diperhitungkan dalam ekuitas.                                       settlement is accounted for within
                                                                                       equity.
Page 29
                                     PT ADARO ENERGY INDONESIA Tbk
                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                             Lampiran 5/17 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                 30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                              (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                       unless otherwise stated)

2.   KEBIJAKAN AKUNTANSI MATERIAL (lanjutan)                 2.   MATERIAL ACCOUNTING POLICIES (continued)

     c.   Prinsip-prinsip konsolidasi (lanjutan)                  c.       Principles of consolidation (continued)

          i.    Entitas anak (lanjutan)                                    i.    Subsidiaries (continued)

                i.2. Akuisisi (lanjutan)                                         i.2. Acquisition (continued)

                    Selisih lebih antara imbalan yang                                 The excess of the consideration
                    dialihkan, jumlah setiap kepentingan                              transferred, the amount of any
                    non-pengendali dalam pihak yang                                   non-controlling interests in the
                    diakuisisi, dan nilai wajar pada                                  acquiree and the acquisition date fair
                    tanggal akuisisi dari kepemilikan                                 value of any previous equity interest
                    ekuitas yang sebelumnya dimiliki                                  in the acquiree over the fair value of
                    oleh pihak pengakuisisi pada pihak                                the Group’s share of the identifiable
                    yang       diakuisisi,  dibandingkan                              net assets acquired is recorded as
                    dengan nilai wajar bagian Grup atas                               goodwill. If those amounts are less
                    aset bersih teridentifikasi yang                                  than the fair value of the net
                    diakuisisi, dicatat sebagai goodwill.                             identifiable assets of the subsidiary
                    Jika jumlah tersebut lebih kecil dari                             acquired and the measurement of all
                    nilai wajar atas aset bersih                                      amounts has been reviewed, in the
                    teridentifikasi entitas anak yang                                 case of a bargain purchase, the
                    diakuisisi dan pengukuran atas                                    difference is recognised directly in
                    seluruh jumlah tersebut telah                                     profit or loss.
                    ditelaah, dalam hal pembelian
                    dengan diskon, selisih tersebut
                    diakui secara langsung dalam laba
                    rugi.

          ii.   Perubahan kepemilikan atas entitas                         ii.   Changes in ownership interest in
                anak tanpa kehilangan pengendalian                               subsidiaries without loss of control

                Transaksi       dengan       kepentingan                         Transactions      with     non-controlling
                non-pengendali          yang        tidak                        interests that do not result in a loss of
                mengakibatkan hilangnya pengendalian                             control are accounted for as equity
                dicatat sebagai transaksi ekuitas. Selisih                       transactions. The difference between the
                antara nilai wajar imbalan yang                                  fair value of any consideration paid and
                dibayarkan dan bagiannya atas jumlah                             the relevant share acquired of the carrying
                tercatat aset neto yang diperoleh dicatat                        amount of net assets of the subsidiary is
                dalam ekuitas. Keuntungan atau kerugian                          recorded in equity. Gains or losses on
                atas pelepasan kepada kepentingan non-                           disposals to non-controlling interests are
                pengendali juga dicatat pada ekuitas.                            also recorded in equity.

          iii. Pelepasan entitas anak                                      iii. Disposal of subsidiaries

                Ketika Grup kehilangan pengendalian                              When the Group loses control of a
                atas entitas anak, Grup menghentikan                             subsidiary, the Group derecognises the
                pengakuan aset (termasuk setiap                                  assets (including any goodwill) and
                goodwill) dan liabilitas entitas anak pada                       liabilities of the subsidiary at their carrying
                nilai tercatatnya ketika pengendalian                            amounts as at the date on which control is
                hilang. Jumlah yang sebelumnya diakui                            lost. Amounts previously recognised in
                dalam penghasilan komprehensif lain                              other comprehensive income are also
                juga direklasifikasi ke laba rugi atau                           reclassified to profit or loss or transferred
                dialihkan secara langsung ke saldo laba                          directly to retained earnings if required
                jika disyaratkan oleh PSAK lain.                                 under other SFAS.
Page 30
                                  PT ADARO ENERGY INDONESIA Tbk
                             DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                           Lampiran 5/18 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                   FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                               30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                            (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                     unless otherwise stated)

2.   KEBIJAKAN AKUNTANSI MATERIAL (lanjutan)               2.   MATERIAL ACCOUNTING POLICIES (continued)

     c.   Prinsip-prinsip konsolidasi (lanjutan)                c.       Principles of consolidation (continued)

          iii. Pelepasan entitas anak (lanjutan)                         iii. Disposal of subsidiaries (continued)

              Sisa investasi pada entitas anak                               Any investment retained in the former
              terdahulu diakui sebesar nilai wajarnya.                       subsidiary is recognised at its fair value.
              Setiap perbedaan antara nilai tercatat                         The difference between the carrying
              sisa investasi pada tanggal hilangnya                          amount of the investment retained at the
              pengendalian dan nilai wajarnya diakui                         date when the control is lost and its fair
              dalam laba rugi.                                               value is recognised in profit or loss.

          iv. Akuntansi entitas asosiasi dan ventura                     iv. Accounting for associates and joint
              bersama                                                        ventures

              Entitas asosiasi adalah suatu entitas                          An associate is an entity over which the
              dimana Grup mempunyai pengaruh                                 Group has significant influence, but not
              signifikan, tetapi tidak mengendalikan,                        control, generally accompanied by a
              dan biasanya Grup memiliki 20% atau                            shareholding giving rise to voting rights of
              lebih hak suara, tetapi tidak melebihi 50%                     20% or greater but not exceeding 50%.
              hak suara. Investasi pada entitas asosiasi                     Investments in associates are accounted
              dicatat    pada      laporan     keuangan                      for in the interim consolidated financial
              konsolidasian interim menggunakan                              statements using the equity method less
              metode ekuitas dikurangi kerugian                              impairment losses, if any.
              penurunan nilai, jika ada.

              Ventura bersama merupakan pengaturan                           A joint venture is a joint arrangement in
              bersama antara beberapa pihak yang                             which the parties that share joint control
              melakukan kesepakatan pengendalian                             have rights to the net assets of the
              bersama yang memiliki hak atas aset neto                       arrangement.      Joint    ventures   are
              pengaturan tersebut. Ventura bersama ini                       accounted for using the equity method
              menggunakan metode ekuitas dikurangi                           less impairment losses, if any.
              kerugian penurunan nilai, jika ada.

              -   Akuisisi                                                   -    Acquisitions

                  Investasi pada entitas asosiasi atau                            Investment in an associate or a joint
                  ventura bersama pada awalnya                                     venture is initially recognised at
                  diakui sebesar biaya perolehan.                                  cost. The cost of an acquisition is
                  Biaya perolehan diukur berdasarkan                               measured at the fair value of the
                  nilai wajar aset yang diserahkan,                                assets        transferred,       equity
                  instrumen ekuitas yang diterbitkan                               instruments issued or liabilities
                  atau liabilitas yang timbul atau                                 incurred or assumed as at the date
                  diambil alih pada tanggal akuisisi,                              of exchange, plus costs directly
                  ditambah biaya yang berhubungan                                  attributable to the acquisition.
                  langsung dengan akuisisi.

                  Goodwill pada akuisisi entitas                                  Goodwill on acquisition of an
                  asosiasi atau ventura bersama                                   associate or a joint venture
                  merupakan selisih lebih yang terkait                            represents the excess of the cost of
                  dengan biaya perolehan investasi                                acquisition of the associate or joint
                  pada entitas asosiasi atau ventura                              venture over the Group’s share of the
                  bersama dengan bagian Grup atas                                 fair value of the identifiable net
                  nilai wajar neto aset teridentifikasi                           assets of the associate or joint
                  dari entitas asosiasi atau ventura                              venture and is included in the
                  bersama dan dimasukkan dalam                                    carrying amount of the investment.
                  jumlah tercatat investasi.
Page 31
                                  PT ADARO ENERGY INDONESIA Tbk
                             DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                           Lampiran 5/19 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                   FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                               30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                            (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                     unless otherwise stated)

2.   KEBIJAKAN AKUNTANSI MATERIAL (lanjutan)               2.   MATERIAL ACCOUNTING POLICIES (continued)

     c.   Prinsip-prinsip konsolidasi (lanjutan)                c.       Principles of consolidation (continued)

          iv. Akuntansi entitas asosiasi dan ventura                     iv. Accounting for associates and joint
              bersama (lanjutan)                                             ventures (continued)

              -   Metode ekuitas                                             -    Equity method

                  Dalam menerapkan metode ekuitas,                                In applying the equity method of
                  bagian Grup atas laba rugi entitas                              accounting, the Group’s share of its
                  asosiasi atau ventura bersama                                   associate’s or joint venture’s post-
                  setelah perolehan diakui dalam laba                             acquisition profit or loss is
                  rugi, dan bagian Grup atas                                      recognised in profit or loss and its
                  penghasilan    komprehensif     lain                            share of post-acquisition other
                  setelah tanggal perolehan diakui                                comprehensive        income       is
                  dalam penghasilan komprehensif                                  recognised in other comprehensive
                  lain.                                                           income.

                  Perubahan        dan      penerimaan                            These post-acquisition movements
                  distribusi dari entitas asosiasi atau                           and distributions received from an
                  ventura bersama setelah tanggal                                 associate or a joint venture are
                  perolehan disesuaikan terhadap nilai                            adjusted against the carrying
                  tercatat investasi.                                             amounts of the investment.

                  Jika bagian Grup atas rugi entitas                              When the Group’s share of the
                  asosiasi atau ventura bersama                                   losses of an associate or a joint
                  sama     dengan     atau    melebihi                            venture equals or exceeds its
                  kepentingannya      pada      entitas                           interest in the associate or joint
                  asosiasi atau ventura bersama,                                  venture,   including   any     other
                  termasuk piutang tidak lancar tanpa                             unsecured non-current receivables,
                  jaminan, maka Grup menghentikan                                 the Group does not recognise further
                  pengakuan bagiannya atas rugi lebih                             losses, unless it has obligations to
                  lanjut,   kecuali   Grup    memiliki                            make or has made payments on
                  kewajiban      untuk      melakukan                             behalf of the associate or joint
                  pembayaran atau telah melakukan                                 venture.
                  pembayaran atas nama entitas
                  asosiasi atau ventura bersama.

                  Keuntungan yang belum direalisasi                               Unrealised gains on transactions
                  atas transaksi antara Grup dengan                               between the Group and its associate
                  entitas asosiasi atau ventura                                   or joint venture are eliminated to the
                  bersama dieliminasi sebesar bagian                              extent of the Group’s interest in the
                  Grup dalam entitas asosiasi atau                                associate      or    joint    venture.
                  ventura bersama tersebut. Kerugian                              Unrealised      losses     are    also
                  yang     belum      direalisasi   juga                          eliminated unless the transaction
                  dieliminasi kecuali transaksi tersebut                          provides evidence of impairment of
                  memberikan bukti penurunan nilai                                the asset being transferred. The
                  atas aset yang ditransfer. Kebijakan                            accounting policies of the associate
                  akuntansi entitas asosiasi atau                                 or joint venture have been changed
                  ventura bersama akan disesuaikan,                               where      necessary      to   ensure
                  apabila diperlukan, agar konsisten                              consistency with the accounting
                  dengan kebijakan akuntansi Grup.                                policies adopted by the Group.
Page 32
                                  PT ADARO ENERGY INDONESIA Tbk
                             DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                           Lampiran 5/20 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                         NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                               FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                           30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                        (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                 unless otherwise stated)

2.   KEBIJAKAN AKUNTANSI MATERIAL (lanjutan)               2.   MATERIAL ACCOUNTING POLICIES (continued)

     c.   Prinsip-prinsip konsolidasi (lanjutan)                c.   Principles of consolidation (continued)

          iv. Akuntansi entitas asosiasi dan ventura                 iv. Accounting for associates and joint
              bersama (lanjutan)                                         ventures (continued)

              -   Metode ekuitas (lanjutan)                              -    Equity method (continued)

                  Dividen yang akan diterima dari                             Dividends receivable from an
                  entitas asosiasi atau ventura                               associate or a joint venture are
                  bersama diakui sebagai pengurang                            recognised as reductions in the
                  jumlah tercatat investasi.                                  carrying amounts of the investment.

                  Pada setiap tanggal pelaporan, Grup                         At each reporting date, the Group
                  menentukan apakah terdapat bukti                            determines whether there is any
                  objektif    bahwa    telah    terjadi                       objective      evidence   that    the
                  penurunan nilai atas investasi pada                         investment in an associate or joint
                  entitas asosiasi atau ventura                               venture is impaired. If any such
                  bersama. Jika bukti tersebut ada,                           evidence       exists,  the    Group
                  maka Grup menghitung besarnya                               calculates the amount of impairment
                  penurunan nilai sebagai selisih                             as the difference between the
                  antara jumlah yang terpulihkan dan                          recoverable amount of the associate
                  nilai tercatat atas investasi pada                          or the joint venture and its carrying
                  entitas asosiasi atau ventura                               amount and recognises the amount
                  bersama dan mengakui selisih                                in profit or loss.
                  tersebut pada laba rugi.

              -   Pelepasan                                              -    Disposals

                  Investasi pada entitas asosiasi atau                        An investment in an associate or a
                  ventura     bersama        dihentikan                       joint venture is derecognised when
                  pengakuannya apabila Grup tidak                             the Group loses significant influence
                  lagi memiliki pengaruh signifikan.                          and any retained equity interest in
                  Grup mengukur investasi yang                                the entity is remeasured at its fair
                  tersisa sebesar nilai wajar. Selisih                        value. The difference between the
                  antara jumlah tercatat investasi yang                       carrying amount of the retained
                  tersisa pada tanggal hilangnya                              interest at the date when significant
                  pengaruh signifikan dan nilai                               influence is lost and its fair value is
                  wajarnya diakui dalam laba rugi.                            recognised in profit or loss.

                  Keuntungan dan kerugian yang                                Gains and losses arising from partial
                  timbul dari pelepasan sebagian atau                         disposal or dilution of an investment
                  dilusi yang timbul pada investasi                           in an associate or a joint venture in
                  pada entitas asosiasi atau ventura                          which significant influence is
                  bersama dimana pengaruh signifikan                          retained are recognised in profit or
                  masih dipertahankan diakui dalam                            loss, and only a proportionate share
                  laba rugi dan hanya suatu bagian                            of the amount previously recognised
                  proporsional atas jumlah yang telah                         in other comprehensive income is
                  diakui sebelumnya pada penghasilan                          reclassified to profit or loss where
                  komprehensif lain yang direklasifikasi                      appropriate.
                  ke laba rugi.
Page 33
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                             Lampiran 5/21 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                 NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                       FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                   30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                                (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                         unless otherwise stated)

2.   KEBIJAKAN AKUNTANSI MATERIAL (lanjutan)                  2.    MATERIAL ACCOUNTING POLICIES (continued)

     d.   Penjabaran mata uang asing                                d.       Foreign currency translation

          i.    Mata uang fungsional dan penyajian                           i.    Functional and presentation currency

                Akun-akun yang disertakan dalam                                    Items included in the financial statements
                laporan keuangan setiap entitas anggota                            of each of the Group’s entities are
                Grup diukur menggunakan mata uang                                  measured using the currency of the
                dari lingkungan ekonomi utama dimana                               primary economic environment in which
                entitas tersebut beroperasi (“mata uang                            the relevant entity operates (the
                fungsional”).     Laporan      keuangan                            “functional currency”). The interim
                konsolidasian interim disajikan dalam                              consolidated financial statements are
                Dolar Amerika Serikat (“AS$” atau “Dolar                           presented in United States Dollar (“US$”
                AS”), yang merupakan mata uang                                     or “US Dollar”), which is the Company’s
                fungsional Perusahaan dan penyajian                                functional currency and the Group’s
                Grup.                                                              presentation currency.

          ii.   Transaksi dan saldo                                          ii.   Transactions and balances

                Transaksi dalam mata uang asing                                    Foreign currency transactions are
                dijabarkan menjadi mata uang fungsional                            translated into the functional currency
                menggunakan kurs yang berlaku pada                                 using the exchange rates prevailing as at
                tanggal    transaksi.   Pada      tanggal                          the date of the transactions. As at the
                pelaporan, setiap aset dan liabilitas                              reporting date, monetary assets and
                moneter dalam mata uang asing                                      liabilities denominated in foreign currency
                disesuaikan untuk mencerminkan kurs                                are adjusted to reflect the prevailing
                yang berlaku pada tanggal tersebut.                                exchange rates at such date. Foreign
                Keuntungan dan kerugian selisih kurs                               exchange gains and losses resulting from
                yang timbul dari penyelesaian transaksi                            the settlement of such transactions and
                dalam mata uang asing dan dari                                     from the translation at period-end
                penjabaran aset dan liabilitas moneter                             exchange rates of monetary assets and
                dalam mata uang asing menggunakan                                  liabilities   denominated      in    foreign
                kurs yang berlaku pada akhir periode                               currencies are recognised in profit or loss.
                pelaporan diakui dalam laba rugi.

                Kurs yang digunakan pada tanggal                                   As at the interim consolidated statements
                laporan posisi keuangan konsolidasian                              of financial position dates, the exchange
                interim, berdasarkan kurs tengah yang                              rates used, based on the middle rates
                diterbitkan Bank Indonesia, adalah                                 published by Bank Indonesia, were as
                sebagai berikut (dalam Dolar AS penuh):                            follows (full US Dollar amount):

                                           30 September             31 Desember/
                                               2023                December 2022

                Rupiah 10.000 (“Rp”)                   0.64                        0.64                 Rupiah 10,000 (“Rp”)
                Dolar Singapura (“S$”)                 0.73                        0.74              Singapore Dollars (“S$”)
                Dolar Australia (“A$”)                 0.64                        0.67              Australian Dollars (“A$”)
                Euro (“€”)                             1.06                        1.06                             Euro (“€”)
Page 34
                                   PT ADARO ENERGY INDONESIA Tbk
                              DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                            Lampiran 5/22 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                             (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                      unless otherwise stated)

2.   KEBIJAKAN AKUNTANSI MATERIAL (lanjutan)                2.   MATERIAL ACCOUNTING POLICIES (continued)

     d.   Penjabaran mata uang asing (lanjutan)                  d.       Foreign currency translation (continued)

          iii. Entitas dalam Grup                                         iii. Group companies

              Hasil usaha operasi dan posisi keuangan                         The results of the operations and financial
              dari seluruh entitas anak Grup (tidak ada                       position of all of the Group’s subsidiaries
              yang mata uang fungsionalnya mata uang                          (none of which has the currency of a
              dari suatu ekonomi hiperinflasi) yang                           hyperinflationary economy) that have a
              memiliki mata uang fungsional yang                              functional currency different from the
              berbeda dengan mata uang penyajian                              Company’s presentation currency are
              Perusahaan, ditranslasikan dalam mata                           translated      into    the     Company’s
              uang penyajian Perusahaan sebagai                               presentation currency as follows:
              berikut:

              (a) Aset dan liabilitas yang disajikan                          (a) The assets and liabilities presented
                  pada laporan posisi keuangan                                    in    the    interim     consolidated
                  konsolidasian interim, dijabarkan                               statements of financial position are
                  pada kurs penutup tanggal laporan                               translated at the closing rate at the
                  posisi    keuangan   konsolidasian                              date of the interim consolidated
                  interim tersebut;                                               statements of financial position;

              (b) Penghasilan dan beban untuk setiap                          (b) The income and expenses for each
                  pos      laba     rugi     dijabarkan                           profit or loss item are translated at
                  menggunakan kurs rata-rata (kecuali                             the average exchange rates (unless
                  jika   rata-rata    tersebut    bukan                           this average is not a reasonable
                  perkiraan wajar efek kumulatif dari                             approximation of the cumulative
                  kurs yang berlaku pada tanggal                                  effect of the rates prevailing on the
                  transaksi, maka penghasilan dan                                 transaction dates, in which case the
                  beban dijabarkan menggunakan kurs                               income and expenses are translated
                  tanggal transaksi); dan                                         at the rates in force on the dates of
                                                                                  the transactions); and

              (c) Seluruh selisih kurs yang timbul                            (c) All of the resulting exchange
                  diakui    dalam       penghasilan                               differences are recognised in other
                  komprehensif lain.                                              comprehensive income.

              Pada konsolidasi, selisih kurs yang timbul                      On consolidation, exchange differences
              dari penjabaran investasi neto pada                             arising from the translation of any net
              entitas asing dan instrumen keuangan                            investments in foreign entities and other
              lainnya yang ditetapkan sebagai lindung                         financial instruments designated as
              nilai atas investasi tersebut, diakui dalam                     hedges of such investments, are
              penghasilan komprehensif lain. Ketika                           recognised in other comprehensive
              investasi dijual, selisih kurs yang terkait                     income. When the investment is sold, the
              direklasifikasi ke laba rugi.                                   associated exchange differences are
                                                                              reclassified to profit or loss.

     e.   Kas dan setara kas                                     e.       Cash and cash equivalents

          Kas dan setara kas termasuk kas, kas di bank,                   Cash and cash equivalents consist of cash on
          dan deposito berjangka yang jatuh tempo                         hand, cash in banks and time deposits with
          dalam jangka waktu tiga bulan atau kurang                       maturity periods of three months or less at the
          pada saat penempatan yang tidak digunakan                       time of placement that are not used as
          sebagai jaminan atau tidak dibatasi                             collateral or are not restricted.
          penggunaannya.

          Laporan arus kas konsolidasian interim                          The interim consolidated statements of cash
          disusun menggunakan metode langsung                             flows have been prepared using the direct
          dengan    mengklasifikasikan      arus    kas                   method by classifying the cash flows on the
          berdasarkan aktivitas operasi, investasi, dan                   basis of operating, investing and financing
          pendanaan.                                                      activities.
Page 35
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                             Lampiran 5/23 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                 30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                              (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                       unless otherwise stated)

2.   KEBIJAKAN AKUNTANSI MATERIAL (lanjutan)                 2.   MATERIAL ACCOUNTING POLICIES (continued)

     f.   Piutang                                                 f.       Receivables

          Piutang usaha adalah jumlah terutang dari                        Trade receivables are amounts due from
          pelanggan atas penjualan batubara dan listrik                    customers for coal and electricity sold or
          atau jasa yang diberikan dalam kegiatan                          services performed in the ordinary course of
          usaha biasa. Piutang non-usaha merupakan                         business. Non-trade receivables are amounts
          jumlah terutang yang timbul dari transaksi di                    arising from transactions outside of the
          luar kegiatan usaha biasa. Jika piutang                          ordinary course of business. If the collection of
          diperkirakan tertagih dalam satu tahun atau                      the receivables is expected within one year or
          kurang, piutang tersebut diklasifikasikan                        less, they are classified as current assets. If
          sebagai aset lancar. Jika tidak, piutang                         not, they are presented as non-current assets
          tersebut disajikan sebagai aset tidak lancar                     in the interim consolidated statements of
          pada laporan posisi keuangan konsolidasian                       financial position.
          interim.

          Piutang usaha pada awalnya diakui sebesar                       Trade receivables are recognised initially at fair
          nilai wajar dan kemudian diukur sebesar biaya                   value and subsequently measured at
          perolehan diamortisasi dengan menggunakan                       amortised cost using the effective interest
          metode suku bunga efektif, jika efek                            method, if the impact of discounting is
          pendiskontoan signifikan, dikurangi dengan                      significant, less any loss allowance.
          cadangan kerugian.

          Kerugian penurunan nilai piutang disajikan                      Impairment losses on receivables are
          sebagai bagian dari beban usaha pada laba                       presented as part of operating expenses in
          rugi. Jumlah yang selanjutnya dapat                             profit or loss. Subsequent recoveries of
          dipulihkan kembali atas piutang yang                            amounts previously written off are credited
          sebelumnya        telah     dihapusbukukan,                     against the same line item.
          dikreditkan terhadap item baris yang sama.

          Lihat Catatan 2i untuk informasi lebih lanjut                   See Note 2i for further information regarding
          mengenai kebijakan penentuan jumlah                             the policy on the determination of the amount
          cadangan kerugian piutang Grup.                                 for the loss allowance on the Group’s
                                                                          receivables.

          Piutang non-usaha dari pihak berelasi pada                        Non-trade receivables from related parties are
          awalnya disajikan sebagai aset tidak lancar                      initially presented as non-current assets
          kecuali jika ada alasan tertentu untuk disajikan                 unless there are specific reasons for them to
          sebagai aset lancar pada laporan posisi                          be presented as current assets in the interim
          keuangan konsolidasian interim.                                  consolidated statements of financial position.

     g.   Piutang dari pengaturan jasa konsesi                    g.       Receivables from        service    concession
                                                                           arrangements

          Piutang yang timbul dari proyek konsesi                          Receivables due from the concession project
          merupakan jasa yang diberikan sehubungan                         represent services provided in connection
          dengan pengaturan konsesi jasa dimana                            with a service concession arrangement for
          minimum pembayar terjamin telah disepakati                       which guaranteed minimum payments have
          terlepas dari jumlah pemakaian. Karena                           been agreed upon irrespective of the extent of
          panjangnya rencana pembayaran, piutang                           use. Due to the length of the payment plans,
          dicatat sebesar nilai kini dari penerimaan kas                   receivables are the present value of future
          yang dijamin dan didiskontokan dengan                            guaranteed cash receipts discounted using a
          menggunakan tingkat suku bunga tertentu.                         certain interest rate. The annual accumulation
          Bunga piutang yang diakumulasikan dalam                          of interest on these receivables is presented
          setahun     dicatat    sebagai     pendapatan                    as finance income from the service
          keuangan dari pengaturan konsesi jasa                            concession arrangement using the effective
          dengan menggunakan metode suku bunga                             interest method. Payments will be divided into
          efektif. Pembayaran akan dibagi menjadi                          a portion to be deducted from the receivables
          bagian yang akan dikurangkan dari piutang                        and interest on the unpaid amounts.
          dan bunga atas jumlah yang belum dibayar.
Page 36
                                   PT ADARO ENERGY INDONESIA Tbk
                              DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                            Lampiran 5/24 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                             (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                      unless otherwise stated)

2.   KEBIJAKAN AKUNTANSI MATERIAL (lanjutan)                2.   MATERIAL ACCOUNTING POLICIES (continued)

     h.   Persediaan                                             h.       Inventories

          Persediaan batubara dinilai berdasarkan nilai                   Coal inventories are stated at the lower of cost
          terendah antara harga perolehan atau nilai                      or net realisable value. Cost is determined
          realisasi neto. Harga perolehan ditentukan                      based on the weighted average method which
          dengan metode rata-rata tertimbang yang                         includes mining costs, direct labour costs,
          mencakup biaya penambangan, biaya tenaga                        other direct costs and an appropriate portion
          kerja langsung, biaya langsung lainnya, dan                     of fixed and variable overheads related to
          alokasi bagian biaya tidak langsung variabel                    mining operations. It excludes borrowing
          dan tetap yang berkaitan dengan kegiatan                        costs. The net realisable value is the
          penambangan. Biaya tersebut tidak termasuk                      estimated selling price in the ordinary course
          biaya pinjaman. Nilai realisasi neto adalah                     of business less the estimated costs of
          estimasi harga jual dalam kegiatan usaha                        completion and the estimated costs
          biasa dikurangi estimasi biaya penyelesaian                     necessary to make the sale.
          dan estimasi biaya yang diperlukan untuk
          membuat penjualan.

          Persediaan suku cadang, bahan bakar, dan                        Spare parts, fuel and supplies are valued at
          perlengkapan dinilai dengan harga perolehan                     cost less a provision for obsolete and slow-
          dikurangi dengan provisi persediaan usang                       moving items. Cost of spare parts and
          dan bergerak lambat. Harga perolehan suku                       supplies is determined based on the moving
          cadang dan perlengkapan ditentukan dengan                       average method while cost of fuel is
          metode rata-rata bergerak sedangkan harga                       determined based on the weighted average
          perolehan untuk bahan bakar ditentukan                          method. A provision for obsolete and slow-
          dengan metode rata-rata tertimbang. Provisi                     moving items is determined on the basis of
          persediaan usang dan bergerak lambat                            estimated future usage or sale of individual
          ditentukan berdasarkan estimasi penggunaan                      inventory items. Supplies of maintenance
          atau    penjualan     masing-masing    jenis                    materials are charged to production costs in
          persediaan pada masa mendatang. Bahan                           the year in which they are used.
          pendukung kegiatan pemeliharaan dicatat
          sebagai beban produksi pada periode
          digunakan.

     i.   Aset keuangan                                          i.       Financial assets

          i.   Klasifikasi,      pengakuan          dan                   i.   Classification,       recognition         and
               pengukuran                                                      measurement

               Grup mengklasifikasikan aset keuangan                           The Group classifies its financial assets
               dalam kategori berikut ini:                                     into the following categories:

               (i) aset keuangan diukur pada biaya                             (i) financial   assets     measured    at
                    perolehan diamortisasi; dan                                     amortised cost; and
               (ii) aset keuangan diukur pada nilai wajar                      (ii) financial assets measured at fair
                    melalui laba rugi atau melalui                                  value either through profit or loss
                    penghasilan komprehensif lain.                                  (“FVTPL”)    or     through    other
                                                                                    comprehensive income (“FVOCI”).

               Klasifikasi ini tergantung pada model                           The classification depends on the
               bisnis Grup dan persyaratan kontraktual                         Group’s business model and the
               arus kas - apakah penentuan arus kasnya                         contractual terms of the cash flows when
               semata dari pembayaran pokok dan                                determining whether their cash flows are
               bunga.                                                          solely payments of principal and interest
                                                                               (“SPPI”).

               Grup menentukan klasifikasi          aset                       The Group determines the classification
               keuangan pada pengakuan awal.                                   of its financial assets at initial recognition.
Page 37
                                      PT ADARO ENERGY INDONESIA Tbk
                                 DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                Lampiran 5/25 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                  NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                        FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                    30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                                 (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                          unless otherwise stated)

2.   KEBIJAKAN AKUNTANSI MATERIAL (lanjutan)                    2.   MATERIAL ACCOUNTING POLICIES (continued)

     i.   Aset keuangan (lanjutan)                                   i.       Financial assets (continued)

          i.   Klasifikasi,     pengakuan               dan                   i.   Classification,  recognition               and
               pengukuran (lanjutan)                                               measurement (continued)

               (i).   Aset keuangan diukur pada biaya                              (i).    Financial assets       measured      at
                      perolehan diamortisasi                                               amortised cost

                      Klasifikasi    ini berlaku    untuk                                  This classification applies to debt
                      instrumen utang yang dikelola dalam                                  instruments which are held under a
                      model      bisnis  “dimiliki  untuk                                  “hold to collect” business model
                      mendapatkan arus kas” dan memiliki                                   and which have cash flows that
                      arus kas yang memenuhi kriteria                                      meet the SPPI criteria.
                      “semata-mata dari pembayaran
                      pokok dan bunga”.

                      Pada pengakuan awal, piutang                                         At      initial  recognition,     trade
                      usaha      yang     tidak    memiliki                                receivables that do not have a
                      komponen        pendanaan       yang                                 significant financing component are
                      signifikan, diakui sebesar harga                                     recognised at their transaction
                      transaksi. Aset keuangan lainnya                                     price. Other financial assets are
                      awalnya diakui sebesar nilai wajar                                   initially recognised at fair value plus
                      dikurangi biaya transaksi yang                                       related transaction costs. They are
                      terkait.    Aset     keuangan       ini                              subsequently         measured         at
                      selanjutnya diukur sebesar biaya                                     amortised cost using the effective
                      perolehan                 diamortisasi                               interest method. Any gains or
                      menggunakan metode suku bunga                                        losses        on   derecognition     or
                      efektif. Keuntungan atau kerugian                                    modification of a financial asset
                      pada penghentian atau modifikasi                                     held at amortised cost are
                      aset keuangan yang dicatat yang                                      recognised in profit or loss.
                      dicatat pada biaya perolehan
                      diamortisasi diakui pada laba rugi.

               (ii). Aset keuangan diukur pada nilai                               (ii).   Financial    assets    measured      at
                     wajar melalui laba rugi                                               FVTPL

                      Klasifikasi ini berlaku untuk aset                                   The classification applies to the
                      keuangan berikut. Dalam semua                                        following financial assets. In all
                      kasus, biaya transaksi dibebankan                                    cases, transaction costs are
                      pada laba rugi:                                                      immediately expensed in profit or
                                                                                           loss:

                      -   Instrumen utang yang tidak                                       -   Debt instruments that do not
                          memiliki kriteria biaya perolehan                                    meet the criteria of amortised
                          diamortisasi atau nilai wajar                                        cost or FVOCI. Subsequent fair
                          melalui               penghasilan                                    value gains or losses are
                          komprehensif lain. Keuntungan                                        recognised in profit or loss.
                          atau    kerugian     nilai  wajar
                          selanjutnya akan dicatat pada
                          laba rugi.

                      -   Investasi ekuitas yang dimiliki                                  -   Equity investments that are held
                          untuk     diperdagangkan       atau                                  for trading or where FVOCI
                          dimana      pilihan   penghasilan                                    election has not been applied.
                          komprehensif lain tidak berlaku.                                     All fair value gains or losses and
                          Keuntungan atau kerugian nilai                                       related dividend income are
                          wajar dan penghasilan dividen                                        recognised in profit or loss.
                          terkait diakui pada laba rugi.
Page 38
                                   PT ADARO ENERGY INDONESIA Tbk
                              DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                             Lampiran 5/26 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                 30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                              (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                       unless otherwise stated)

2.   KEBIJAKAN AKUNTANSI MATERIAL (lanjutan)                 2.   MATERIAL ACCOUNTING POLICIES (continued)

     i.   Aset keuangan (lanjutan)                                i.       Financial assets (continued)

          i.   Klasifikasi,     pengakuan            dan                   i.   Classification,  recognition               and
               pengukuran (lanjutan)                                            measurement (continued)

               (ii). Aset keuangan diukur pada nilai                            (ii).    Financial assets measured           at
                     wajar melalui laba rugi (lanjutan)                                  FVTPL (continued)

                   -   Derivatif yang bukan merupakan                                    -   Derivatives    that    are    not
                       instrumen       lindung   nilai.                                      designated as a hedging
                       Keuntungan atau kerugian nilai                                        instrument. All subsequent fair
                       wajar selanjutnya diakui pada                                         value gains or losses are
                       laba rugi.                                                            recognised in profit or loss.

                   -   Aset keuangan dengan derivatif                                    -   Financial assets with embedded
                       melekat dipertimbangkan secara                                        derivatives are considered in
                       keseluruhan saat menentukan                                           their entirety when determining
                       apakah arus kasnya semata-                                            whether their cash flows are
                       mata merupakan pembayaran                                             SPPI.
                       pokok dan bunga.

               (iii). Aset keuangan diukur pada nilai                           (iii).   Financial    assets    measured     at
                      wajar    melalui    penghasilan                                    FVOCI
                      komprehensif lain

                   Klasifikasi ini berlaku untuk aset                                    This classification applies to the
                   keuangan berikut ini:                                                 following financial assets:

                   -   Instrumen utang yang dikelola                                     -   Debt instruments that are held
                       dengan model bisnis yang                                              under a business model where
                       bertujuan untuk memiliki aset                                         they are held for collection of
                       keuangan      dalam     rangka                                        contractual cash flows and also
                       mendapatkan       arus     kas                                        for sale (“collect and sell”) and
                       kontraktual dan menjual dan di                                        which have cash flows that meet
                       mana arus kasnya memenuhi                                             the SPPI criteria.
                       kriteria   “semata-mata    dari
                       pembayaran pokok dan bunga”.

                       Perubahan nilai wajar aset                                            All movements in the fair value
                       keuangan ini dicatat pada                                             of these financial assets are
                       penghasilan komprehensif lain,                                        taken         through         other
                       kecuali pengakuan keuntungan                                          comprehensive income, except
                       atau kerugian penurunan nilai,                                        for the recognition of impairment
                       pendapatan bunga (termasuk                                            gains or losses, interest revenue
                       biaya transaksi menggunakan                                           (including transaction costs by
                       metode suku bunga efektif),                                           applying the effective interest
                       keuntungan atau kerugian yang                                         method), gains or losses arising
                       timbul dari penghentian dan                                           on derecognition and foreign
                       keuntungan dan kerugian dari                                          exchange gains and losses that
                       selisih kurs diakui pada laba rugi.                                   are recognised in profit or loss.
                       Ketika aset keuangan dihentikan,                                      When the financial asset is
                       keuntungan atau kerugian nilai                                        derecognised, the cumulative
                       wajar kumulatif yang sebelumnya                                       fair value gains or losses
                       diakui      pada      penghasilan                                     previously recognised in other
                       komprehensif lain direklasifikasi                                     comprehensive income are
                       pada laba rugi.                                                       reclassified to profit or loss.
Page 39
                                     PT ADARO ENERGY INDONESIA Tbk
                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/27 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                 NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                       FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                   30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                                (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                         unless otherwise stated)

2.   KEBIJAKAN AKUNTANSI MATERIAL (lanjutan)                   2.   MATERIAL ACCOUNTING POLICIES (continued)

     i.   Aset keuangan (lanjutan)                                  i.       Financial assets (continued)

          i.    Klasifikasi,     pengakuan             dan                   i.    Classification,  recognition              and
                pengukuran (lanjutan)                                              measurement (continued)

                (iii). Aset keuangan diukur pada nilai                             (iii).   Financial assets measured           at
                       wajar    melalui        penghasilan                                  FVOCI (continued)
                       komprehensif lain (lanjutan)

                     Klasifikasi ini berlaku untuk aset                                     This classification applies to the
                     keuangan berikut ini: (lanjutan)                                       following      financial    assets:
                                                                                            (continued)

                     - Investasi ekuitas di mana Grup                                       -   Equity investments where the
                       telah    memilih   tidak   dapat                                         Group has irrevocably elected to
                       dibatalkan untuk menyajikan                                              present fair value gains and
                       keuntungan dan kerugian nilai                                            losses on revaluation in other
                       wajar    dari   revaluasi  pada                                          comprehensive income.
                       penghasilan komprehensif lain.

                        Pilihan dapat didasarkan pada                                           The election can be made for
                        investasi individu, namun, tidak                                        each individual investment;
                        berlaku pada investasi ekuitas                                          however, it is not applicable to
                        yang         dimiliki         untuk                                     equity investments held for
                        diperdagangkan.       Keuntungan                                        trading. Fair value gains or
                        atau kerugian nilai wajar dari                                          losses on the revaluation of such
                        revaluasi    investasi      ekuitas,                                    equity investments, including
                        termasuk komponen selisih kurs,                                         any        foreign       exchange
                        diakui     pada       penghasilan                                       component, are recognised in
                        komprehensif       lain.     Ketika                                     other comprehensive income.
                        investasi   ekuitas      dihentikan                                     When the equity investment is
                        pengakuannya, keuntungan atau                                           derecognised, there is no
                        kerugian    nilai    wajar     yang                                     reclassification of fair value
                        sebelumnya        diakui     dalam                                      gains or losses previously
                        penghasilan komprehensif lain                                           recognised          in       other
                        tidak direklasifikasi pada laba                                         comprehensive income to profit
                        rugi. Dividen diakui dalam laba                                         or     loss.     Dividends     are
                        rugi ketika hak untuk menerima                                          recognised in profit or loss when
                        pembayaran telah ditetapkan.                                            the right to receive payment is
                                                                                                established.

                Grup mereklasifikasi investasi utang jika                          The Group reclassifies debt investments,
                dan hanya jika model bisnis untuk                                  if, and only if, the business model for
                mengelola aset tersebut berubah.                                   managing those assets changes.

                Lihat Catatan 2j untuk rincian kebijakan                           Refer to Note 2j for details of the Group’s
                akuntansi Grup atas instrumen keuangan                             accounting policy on derivative financial
                derivatif.                                                         instruments.

          ii.   Penghentian pengakuan                                        ii.   Derecognition

                Aset keuangan dihentikan pengakuannya                              Financial assets are derecognised when
                ketika hak untuk menerima arus kas dari                            the rights to receive cash flows from the
                investasi tersebut telah jatuh tempo atau                          investments have expired or have been
                telah ditransfer dan Grup telah                                    transferred and the Group has
                mentransfer secara substansial seluruh                             transferred substantially all of the risks
                risiko dan manfaat atas kepemilikan aset.                          and rewards of ownership.
Page 40
                                   PT ADARO ENERGY INDONESIA Tbk
                              DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                            Lampiran 5/28 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                             (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                      unless otherwise stated)

2.   KEBIJAKAN AKUNTANSI MATERIAL (lanjutan)                2.   MATERIAL ACCOUNTING POLICIES (continued)

     i.   Aset keuangan (lanjutan)                               i.       Financial assets (continued)

          iii. Penurunan nilai aset keuangan                              iii. Impairment of financial assets

              Grup menilai berdasarkan basis forward-                         The Group assesses on a forward-looking
              looking untuk mengukur kerugian kredit                          basis, the expected credit losses (“ECL”)
              ekspektasian terhadap aset keuangan                             associated with its financial assets carried
              yang diukur pada biaya perolehan                                at amortised cost. The impairment
              diamortisasi. Metode penurunan nilai                            method applied depends on whether
              dilakukan dengan mempertimbangkan                               there has been a significant increase in
              apakah risiko kredit telah meningkat                            credit risk.
              secara signifikan.

              Pada setiap periode pelaporan, Grup                             At each reporting date, the Group
              menilai apakah risiko kredit dari                               assesses whether the credit risk on a
              instrumen keuangan telah meningkat                              financial instrument has increased
              secara signifikan sejak pengakuan awal.                         significantly since initial recognition.
              Ketika melakukan penilaian, Grup                                When making the assessment, the Group
              menggunakan perubahan atas risiko                               uses the change in the risk of a default
              gagal bayar yang terjadi sepanjang                              occurring over the expected life of the
              perkiraan usia instrumen keuangan                               financial instrument instead of the change
              daripada perubahan atas jumlah kerugian                         in the amount of ECL. To make that
              kredit ekspektasian. Dalam melakukan                            assessment, the Group compares the risk
              penilaian, Grup membandingkan antara                            of a default occurring on the financial
              risiko gagal bayar yang terjadi atas                            instrument as at the reporting date with
              instrumen keuangan pada saat periode                            the risk of a default occurring on the
              pelaporan dengan risiko gagal bayar yang                        financial instrument as at the date of initial
              terjadi atas instrumen keuangan pada                            recognition and considers reasonable
              saat      pengakuan       awal       dan                        and supportable information, that is
              mempertimbangkan kewajaran serta                                available without undue cost or effort at
              ketersediaan informasi yang tersedia                            the reporting date about past events,
              pada saat tanggal pelaporan terkait                             current conditions and forecasts of future
              dengan kejadian masa lalu, kondisi terkini                      economic conditions, that is indicative of
              dan perkiraan atas kondisi ekonomi di                           significant increases in credit risk since
              masa depan, yang mengindikasikan                                initial recognition.
              kenaikan risiko kredit sejak pengakuan
              awal.

              Grup menerapkan pendekatan yang                                 The Group applies the “simplified
              disederhanakan         untuk       mengukur                     approach” to measuring ECL which uses
              kerugian kredit ekspektasian yang                               a lifetime expected loss allowance for all
              menggunakan cadangan kerugian kredit                            trade receivables, other receivables and
              ekspektasian seumur hidup untuk seluruh                         contract assets without significant
              saldo piutang usaha dan piutang lain-lain                       financing components and the “general
              dan aset kontrak tanpa komponen                                 approach” for all other financial assets.
              pendanaan        yang      signifikan   dan                     The general approach incorporates a
              pendekatan umum untuk aset keuangan                             review for any significant increase in
              lainnya. Pendekatan umum termasuk                               counterparty credit risk since inception.
              penelaahan perubahan signifikan risiko                          The ECL reviews include assumptions
              kredit sejak terjadinya. Penelaahan                             about the risk of default and expected
              kerugian kredit ekspektasian termasuk                           loss rates. For trade receivables, the
              asumsi mengenai risiko gagal bayar dan                          assessment considers the use of credit
              tingkat kerugian ekspektasian. Untuk                            enhancements, for example, letters of
              piutang usaha, dalam pengkajian juga                            credit and bank guarantees. To measure
              mempertimbangkan                penggunaan                      the ECL, trade receivables have been
              peningkatan kredit, misalnya, letter of                         grouped based on similar credit risk
              credit dan garansi bank. Untuk mengukur                         characteristics and the days past due.
              kerugian kredit ekspektasian, piutang
              usaha telah dikelompokkan berdasarkan
              karakteristik risiko kredit dan jatuh tempo
              yang serupa.
Page 41
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/29 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                 NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                       FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                   30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                                (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                         unless otherwise stated)

2.   KEBIJAKAN AKUNTANSI MATERIAL (lanjutan)                   2.   MATERIAL ACCOUNTING POLICIES (continued)

     i.   Aset keuangan (lanjutan)                                  i.       Financial assets (continued)

          iv. Saling   hapus         antar      instrumen                    iv. Offsetting financial instruments
              keuangan

              Aset dan liabilitas keuangan saling hapus                          Financial assets and liabilities are offset
              dan nilai netonya disajikan dalam laporan                          and their net amounts are reported
              posisi keuangan konsolidasian interim                              in the interim consolidated statements of
              jika terdapat hak yang dapat dipaksakan                            financial position when there is a legally
              secara hukum untuk melakukan saling                                enforceable right to offset the recognised
              hapus atas jumlah yang telah diakui                                amounts and there is an intention to settle
              tersebut dan terdapat maksud untuk                                 on a net basis or realise the asset and
              menyelesaikan secara neto atau untuk                               settle the liability simultaneously.
              merealisasikan aset dan menyelesaikan
              liabilitas secara bersamaan.

     j.   Instrumen keuangan derivatif dan aktivitas                j.       Derivative financial       instruments     and
          lindung nilai                                                      hedging activities

          Instrumen keuangan derivatif pada awalnya                          Derivative financial instruments are initially
          diakui sebesar nilai wajar tanggal kontrak                         recognised at fair value on the date on which
          derivatif dimulai dan selanjutnya dinilai                          a derivative contract is entered into and are
          kembali sebesar nilai wajarnya. Metode                             subsequently remeasured at their fair values.
          pengakuan keuntungan atau kerugian yang                            The method of recognising the resulting gain
          terjadi tergantung apakah derivatif tersebut                       or loss depends on whether the derivative is
          merupakan instrumen lindung nilai dan jika                         designated as a hedging instrument and, if so,
          demikian sifat objek yang dilindungi nilainya.                     on the nature of the item being hedged. The
          Grup mengelompokkan derivatif tertentu                             Group designates certain derivatives as either
          sebagai (a) lindung nilai atas nilai wajar aset                    (a) hedges of the fair value of recognised
          atau liabilitas yang diakui atau komitmen pasti                    assets or liabilities or a firm commitment (fair
          yang belum diakui (lindung nilai wajar); atau                      value hedge); or (b) hedges of a particular risk
          (b) lindung nilai risiko tertentu yang terkait                     associated with a recognised asset or liability
          dengan aset atau liabilitas atau transaksi yang                    or a highly probable forecast transaction (cash
          diperkirakan kemungkinan besar terjadi                             flow hedge).
          (lindung nilai arus kas).

          Pada saat terjadinya transaksi, Grup                               At the inception of the transaction, the Group
          mendokumentasi hubungan antara instrumen                           documents the relationship between hedging
          lindung nilai dan item yang dilindung nilai, juga                  instruments and hedging items, as well as its
          tujuan manajemen risiko dan strategi yang                          risk management objectives and the strategy
          diterapkan dalam melakukan berbagai macam                          for undertaking hedging transactions. The
          transaksi     lindung    nilai.    Grup       juga                 Group also documents its assessment, both at
          mendokumentasikan penilaiannya, pada saat                          the hedge inception and on an ongoing basis,
          terjadinya dan secara berkesinambungan,                            of whether the derivatives used in hedging
          apakah derivatif yang digunakan untuk                              transactions are highly effective in offsetting
          transaksi lindung nilai memiliki efektivitas yang                  changes in the fair value of or the cash flow
          tinggi dalam rangka saling hapus perubahan                         from hedged items.
          nilai wajar atau arus kas item yang dilindung
          nilai.

          Nilai     penuh     derivatif   lindung     nilai                  The full value of a hedging derivative is
          dikelompokkan sebagai aset tidak lancar atau                       classified as a non-current asset or liability
          liabilitas jangka panjang apabila jatuh tempo                      when the remaining maturity of the hedged
          item yang dilindung nilai tersebut melebihi                        item is more than 12 months and as a current
          12 bulan dan sebagai aset lancar atau liabilitas                   asset or liability when the remaining maturity
          jangka pendek apabila jatuh tempo item                             of the hedged item is less than 12 months
          lindung nilai tersebut kurang dari 12 bulan dari                   from the reporting date.
          tanggal pelaporan.
Page 42
                                      PT ADARO ENERGY INDONESIA Tbk
                                 DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                Lampiran 5/30 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                   NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                         FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                     30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                                  (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                           unless otherwise stated)

2.   KEBIJAKAN AKUNTANSI MATERIAL (lanjutan)                     2.   MATERIAL ACCOUNTING POLICIES (continued)

     j.   Instrumen keuangan derivatif dan aktivitas                  j.        Derivative financial instruments             and
          lindung nilai (lanjutan)                                              hedging activities (continued)

          i.    Lindung nilai atas nilai wajar                                  i.    Fair value hedge

                Perubahan nilai wajar derivatif yang                                  Changes in the fair values of derivatives
                ditetapkan dan memenuhi kriteria sebagai                              that are designated and qualify as fair
                lindung nilai atas nilai wajar, dicatat dalam                         value hedges are recognised in profit or
                laba rugi, bersamaan dengan perubahan                                 loss, together with any changes in the fair
                yang terjadi pada nilai wajar aset atau                               value of the hedged asset or liability that
                liabilitas lindung nilai terkait dengan risiko                        are attributable to the hedged risk. The
                lindung nilai. Keuntungan atau kerugian                               gain or loss relating to the effective
                yang terkait dengan bagian efektif lindung                            portion of such a fair value hedge is
                nilai atas nilai wajar diakui dalam laba                              recognised in profit or loss in the same
                rugi, di baris yang sama dengan                                       line as the changes in fair value of the
                perubahan nilai wajar item lindung nilai.                             hedged item to which it relates. The gain
                Keuntungan atau kerugian yang terkait                                 or loss relating to the ineffective portion
                dengan bagian yang tidak efektif diakui                               is recognised immediately in profit or
                dalam laba rugi.                                                      loss.

          ii.   Lindung nilai arus kas                                          ii.   Cash flow hedge

                Bagian efektif perubahan nilai wajar                                  The effective portion of changes in the
                derivatif yang ditetapkan dan memenuhi                                fair value of derivatives that are
                kriteria sebagai lindung nilai arus kas,                              designated and qualify as cash flow
                diakui dalam penghasilan komprehensif                                 hedges is recognised in other
                lain. Keuntungan atau kerugian yang                                   comprehensive income. The gain or loss
                terkait bagian yang tidak efektif diakui                              relating to the ineffective portion is
                dalam laba rugi.                                                      recognised immediately in profit or loss.

                Jumlah yang diakumulasikan dalam                                      Amounts       accumulated        in    other
                penghasilan komprehensif lain di ekuitas                              comprehensive income within equity are
                direklasifikasi ke laba rugi pada saat item                           reclassified to profit or loss in the period
                lindung nilai mempengaruhi laba rugi.                                 when the hedged item affects profit or
                Keuntungan atau kerugian terkait bagian                               loss. The gain or loss relating to the
                efektif lindung nilai arus kas diakui dalam                           effective portion of the cash flow hedge is
                laba rugi, di baris yang sama dengan item                             recognised in profit or loss in the same
                lindung nilai. Akan tetapi, ketika proyeksi                           line as the hedged item to which it relates.
                transaksi     yang      di   lindung    nilai                         However, when the forecast transaction
                menimbulkan         aset      non-keuangan                            that is being hedged results in the
                (contohnya persediaan atau aset tetap),                               recognition of a non-financial asset (for
                keuntungan        dan      kerugian    yang                           example, inventory or fixed assets), the
                sebelumnya ditangguhkan di ekuitas                                    gains and losses previously deferred in
                akan dialihkan dari ekuitas dan                                       equity are transferred from equity and
                dimasukkan di dalam pengukuran awal                                   included in the initial measurement of the
                harga perolehan aset tersebut. Jumlah                                 cost of the asset. The deferred amounts
                yang ditangguhkan pada akhirnya diakui                                are ultimately recognised in the cost of
                dalam akun beban pokok pendapatan                                     revenue in the case of inventory or in
                apabila terkait dengan persediaan atau                                depreciation expense in the case of fixed
                dalam akun beban penyusutan apabila                                   assets.
                terkait dengan aset tetap.

                Ketika instrumen lindung nilai kadaluarsa                             When a hedging instrument expires or is
                atau dijual, atau ketika lindung nilai tidak                          sold, or when a hedge no longer meets
                lagi memenuhi kriteria akuntansi lindung                              the criteria for hedge accounting, any
                nilai, keuntungan atau kerugian kumulatif                             cumulative gain or loss existing in equity
                yang ada di ekuitas saat itu tetap berada                             at that time remains in equity and is
                di bagian ekuitas dan diakui pada saat                                recognised when the forecast transaction
                prakiraan transaksi terjadi dalam laba                                is ultimately recognised in profit or loss.
                rugi. Apabila prakiraan transaksi tidak lagi                          When a forecast transaction is no longer
                diharapkan akan terjadi, keuntungan atau                              expected to occur, the cumulative gain or
                kerugian kumulatif yang telah dicatat di                              loss that was reported in equity is
                bagian ekuitas segera dialihkan dalam                                 immediately transferred to profit or loss.
                laba rugi.
Page 43
                                   PT ADARO ENERGY INDONESIA Tbk
                              DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                            Lampiran 5/31 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                 30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                              (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                       unless otherwise stated)

2.   KEBIJAKAN AKUNTANSI MATERIAL (lanjutan)                2.    MATERIAL ACCOUNTING POLICIES (continued)

     j.   Instrumen keuangan derivatif dan aktivitas              j.       Derivative financial instruments           and
          lindung nilai (lanjutan)                                         hedging activities (continued)

          Perubahan nilai wajar dari derivatif yang tidak                  Changes in the fair value of any derivative
          ditetapkan, atau tidak memenuhi kriteria                         instruments that are not designated as, or do
          untuk, akuntansi lindung nilai diakui secara                     not qualify for, hedge accounting are
          langsung dalam laba rugi.                                        recognised immediately in profit or loss.

     k.   Aset tetap                                              k.       Fixed assets

          Grup menganalisis fakta dan keadaan untuk                        The Group analyses the facts and
          masing-masing jenis hak atas tanah dalam                         circumstances for each type of land rights in
          menentukan akuntansi untuk masing-masing                         determining the accounting for each of its land
          hak atas tanah tersebut sehingga dapat                           rights so that it accurately represents an
          merepresentasikan dengan tepat suatu                             underlying economic event or transaction. If
          kejadian atau transaksi ekonomis yang                            the land rights do not transfer control of the
          mendasarinya. Jika hak atas tanah tersebut                       underlying assets to the Group, but give the
          tidak mengalihkan pengendalian atas aset                         rights to use the underlying assets, the Group
          pendasar     kepada      Grup,      melainkan                    applies the accounting treatment for leases
          mengalihkan hak untuk menggunakan aset                           under SFAS No. 73, “Leases”. If the land
          pendasar, Grup menerapkan perlakuan                              rights are substantially similar to land
          akuntansi atas transaksi tersebut sebagai                        purchases, the Group applies SFAS No. 16,
          sewa berdasarkan PSAK No. 73, “Sewa”. Jika                       “Property, plant and equipment” under which
          hak atas tanah secara substansi menyerupai                       land rights are recognised at cost and not
          pembelian tanah, maka Grup menerapkan                            depreciated.
          PSAK No. 16, “Aset tetap” yaitu hak atas tanah
          diakui sebesar harga perolehan dan tidak
          disusutkan.

          Pada awalnya, semua aset tetap diakui                            Fixed assets are initially recognised at cost
          sebesar harga perolehan dan setelahnya                           and subsequently carried at cost less
          dicatat sebesar harga perolehan dikurangi                        accumulated depreciation and accumulated
          akumulasi penyusutan dan akumulasi                               impairment losses. Fixed assets, except for
          kerugian penurunan nilai. Aset tetap, kecuali                    the fixed assets of AI, LSA, SCM, MIP, the
          aset tetap AI, LSA, SCM, MIP, entitas-entitas                    AMC entities, PC and RC, are depreciated
          AMC, PC dan RC, disusutkan hingga                                using the straight-line method to their residual
          mencapai estimasi nilai sisa menggunakan                         values over their estimated useful lives as
          metode garis lurus selama estimasi masa                          follows:
          manfaatnya sebagai berikut:

                                                     Tahun/Years

          Bangunan                                      10 - 30                                                 Buildings
          Infrastruktur                                  4 - 30                                            Infrastructure
          Pembangkit listrik                               25                                              Power plants
          Mesin, peralatan operasional,                                              Machineries, operational equipment
            dan kendaraan                               4 - 30                                           and vehicles
          Kapal                                         5 - 25                                                   Vessels
          Peralatan kantor                               2-8                                           Office equipment
          Jalan dan jembatan                            10 - 20                                      Roads and bridges
Page 44
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                             Lampiran 5/32 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                 30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                              (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                       unless otherwise stated)

2.   KEBIJAKAN AKUNTANSI MATERIAL (lanjutan)                   2.     MATERIAL ACCOUNTING POLICIES (continued)

     k.   Aset tetap (lanjutan)                                       k.   Fixed assets (continued)

          Aset tetap AI, LSA, SCM, MIP, entitas-entitas                    The fixed assets of AI, LSA, SCM, MIP, the
          AMC, PC dan RC disusutkan menggunakan                            AMC entities, PC and RC are depreciated
          metode garis lurus selama periode yang lebih                     using the straight-line method over the lesser
          rendah antara estimasi masa manfaat aset,                        of the estimated useful lives of the assets, the
          umur tambang, atau masa jangka waktu                             life of the mine, or the term of the relevant
          lisensi atau kontrak yang relevan, sebagai                       licence or contract, as follows:
          berikut:

                                                      Tahun/Years

          Bangunan                                           3 - 20                                             Buildings
          Infrastruktur                                      3 - 20                                        Infrastructure
          Mesin, peralatan operasional,                                              Machineries, operational equipment
             dan kendaraan                                   2 - 25                                      and vehicles
          Peralatan kantor                                   2 - 10                                    Office equipment
          Fasilitas peremukan dan pengolahan                 2 - 30                     Crushing and handling facilities
          Jalan dan jembatan                                 2 - 30                                  Roads and bridges

          Biaya-biaya yang terjadi setelah pengakuan                       Subsequent costs are included in the asset’s
          awal diakui sebagai bagian nilai tercatat aset                   carrying amount or recognised as a separate
          atau sebagai aset terpisah, sebagaimana                          asset, as appropriate, only when it is probable
          mestinya, hanya jika kemungkinan besar Grup                      that future economic benefits associated with
          akan mendapatkan manfaat ekonomis di                             the item will flow to the Group and the cost of
          masa depan berkenaan dengan aset tersebut                        the item can be measured reliably. The
          dan biaya perolehan aset dapat diukur dengan                     carrying amounts of the replaced parts are
          andal. Nilai tercatat komponen yang                              derecognised. All other repairs and
          digantikan dihapuskan. Biaya perbaikan dan                       maintenance are charged to profit or loss
          pemeliharaan dibebankan dalam laba rugi                          during the financial period/year in which they
          dalam periode/tahun buku ketika biaya-biaya                      are incurred.
          tersebut terjadi.

          Masa manfaat, nilai sisa, dan metode                             The useful lives, residual values and
          penyusutan aset tetap ditelaah, jika                             depreciation methods of fixed assets are
          diperlukan, setidaknya disesuaikan, pada                         reviewed and adjusted if appropriate, at the
          setiap akhir periode/tahun buku. Dampak dari                     end of each financial period/year. The effects
          setiap revisi diakui dalam laba rugi ketika                      of any revisions are recognised in profit or loss
          perubahan terjadi.                                               when the changes arise.

          Nilai tercatat aset segera diturunkan sebesar                    An asset’s carrying amount is written down
          jumlah yang dapat dipulihkan apabila nilai                       immediately to its recoverable amount if the
          tercatat aset lebih besar daripada estimasi                      asset’s carrying amount is greater than its
          jumlah yang dapat dipulihkan (Catatan 2m).                       estimated recoverable amount (Note 2m).

          Nilai tercatat aset tetap yang tidak digunakan                   For assets which are no longer utilised or sold
          lagi atau dijual atau diserahkan pada                            or surrendered to the Government, the
          Pemerintah,      dikeluarkan     dari    laporan                 carrying amounts are eliminated from the
          keuangan       konsolidasian     interim,    dan                 interim consolidated financial statements and
          keuntungan atau kerugian yang timbul akibat                      the resulting gains or losses on disposals of
          pelepasan aset tetap tersebut diakui dalam                       fixed assets are recognised in profit or loss.
          laba rugi.

          Akumulasi biaya konstruksi bangunan, jalan                       The accumulated costs of the construction of
          dan     jembatan,   infrastruktur, fasilitas                     buildings, roads and bridges, infrastructure,
          peremukan dan pengolahan dan pemasangan                          crushing and handling facilities and the
          mesin dikapitalisasi sebagai aset dalam                          installation of machineries are capitalised as
          pembangunan. Biaya tersebut direklasifikasi                      construction in progress. These costs are
          ke akun aset tetap pada saat proses                              reclassified to the fixed asset accounts when
          konstruksi   atau   pemasangan     selesai.                      the construction or installation is complete.
          Penyusutan dimulai pada saat aset tersebut                       Depreciation is charged from the date on
          siap untuk digunakan sesuai dengan tujuan                        which the assets are ready for use in the
          yang diinginkan manajemen.                                       manner intended by management.
Page 45
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/33 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                  30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                               (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                        unless otherwise stated)

2.   KEBIJAKAN AKUNTANSI MATERIAL (lanjutan)                  2.   MATERIAL ACCOUNTING POLICIES (continued)

     l.   Goodwill                                                 l.       Goodwill

          Goodwill timbul dari akuisisi entitas anak dan                    Goodwill arises from the acquisition of
          merupakan selisih imbalan yang ditransfer                         subsidiaries and represents the excess of the
          terhadap kepemilikan dalam nilai wajar neto                       consideration transferred over the interest in
          atas aset, liabilitas, dan liabilitas kontinjensi                 the net fair value of the net identifiable assets,
          teridentifikasi dan nilai wajar kepentingan                       liabilities and contingent liabilities of the
          non-pengendali pada pihak diakuisisi.                             acquiree and the fair value of the non-
                                                                            controlling interest in the acquiree.

          Untuk pengujian penurunan nilai, goodwill                         For the purposes of impairment testing,
          yang diperoleh dalam kombinasi bisnis                             goodwill acquired in a business combination is
          dialokasikan pada setiap Unit Penghasil Kas                       allocated to each Cash-Generating Unit
          (“UPK”), atau kelompok UPK, yang                                  (“CGU”), or group of CGUs, which is expected
          diharapkan dapat memberikan manfaat dari                          to benefit from the synergies of the
          sinergi kombinasi bisnis tersebut. Setiap unit                    combination. Each CGU or group of CGUs to
          atau kelompok unit yang memperoleh alokasi                        which the goodwill is allocated represents the
          goodwill menunjukkan tingkat terendah dalam                       lowest level within the entity at which goodwill
          entitas yang goodwill-nya dipantau untuk                          is monitored for internal management
          tujuan manajemen internal. Goodwill dipantau                      purposes. Goodwill is monitored at the
          pada level segmen operasi.                                        operating segment level.

     m.   Penurunan nilai dari aset non-keuangan                   m.       Impairment of non-financial assets

          Aset yang memiliki umur manfaat tidak                             Assets that have an indefinite useful life, for
          terbatas, misalnya goodwill atau aset                             example, goodwill or intangible assets not
          takberwujud yang belum siap digunakan, tidak                      ready to use, are not subject to amortisation
          diamortisasi namun diuji penurunan nilainya                       but tested annually for impairment, or more
          setiap tahun, atau lebih sering jika terdapat                     frequently if events or changes in
          kejadian atau perubahan keadaan yang                              circumstances indicate that the carrying
          mengindikasikan bahwa nilai tercatatnya                           amount may not be recoverable. Assets that
          mungkin tidak dapat dipulihkan. Aset yang                         have a definite useful life are subject to
          memiliki umur manfaat terbatas, diamortisasi                      amortisation or depreciation, and are
          atau disusutkan, dan diuji untuk penurunan                        reviewed for impairment whenever events or
          nilai jika terdapat kejadian atau perubahaan                      changes in circumstances indicate that the
          keadaan yang mengindikasikan bahwa nilai                          carrying amount may not be recoverable. An
          tercatatnya mungkin tidak dapat dipulihkan.                       impairment loss is recognised at the amount
          Penurunan nilai diakui jika nilai tercatat aset                   by which the asset’s carrying amount exceeds
          melebihi jumlah terpulihkannya. Jumlah                            its recoverable amount. The recoverable
          terpulihkan merupakan jumlah yang lebih                           amount is the higher of an asset’s fair value
          tinggi antara nilai wajar aset dikurangi biaya                    less costs of disposal and its value in use. For
          untuk menjual dan nilai pakai aset. Dalam                         the purposes of assessing impairment, assets
          menentukan        penurunan      nilai,     aset                  are grouped at the lowest level for which there
          dikelompokkan pada tingkat yang paling                            is separately identifiable cash flows. Non-
          rendah dimana terdapat arus kas yang dapat                        financial assets other than goodwill that suffer
          diidentifikasi. Aset non-keuangan selain                          impairment are reviewed for possible reversal
          goodwill yang mengalami penurunan nilai diuji                     of the impairment at each reporting date.
          untuk      menentukan      apakah       terdapat
          kemungkinan pemulihan penurunan nilai,
          pada setiap tanggal pelaporan.

          Pembalikan rugi penurunan nilai, untuk aset                       Reversal of impairment losses for assets other
          selain goodwill, diakui jika, dan hanya jika,                     than goodwill is recognised if, and only if,
          terdapat perubahan estimasi yang digunakan                        there has been a change in the estimates
          dalam menentukan jumlah terpulihkan aset                          used to determine the asset’s recoverable
          sejak pengujian penurunan nilai terakhir kali.                    amount since the last impairment testing was
          Pembalikan rugi penurunan nilai tersebut                          carried out. The reversal of impairment losses
          diakui segera dalam laba rugi. Pembalikan                         will be recognised immediately in profit or loss.
          tersebut tidak boleh mengakibatkan nilai                          The reversal should not result in the carrying
          tercatat aset melebihi biaya perolehan                            amount of an asset exceeding what the
          disusutkan sebelum adanya pengakuan                               depreciated cost would have been had the
          penurunan nilai pada tanggal pembalikan                           impairment not been recognised at the date
          dilakukan. Rugi penurunan nilai atas goodwill                     on which the impairment was reversed.
          tidak dibalik lagi.                                               Impairment losses relating to goodwill will not
                                                                            be reversed.
Page 46
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                             Lampiran 5/34 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                           NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                 FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                             30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                          (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                   unless otherwise stated)

2.   KEBIJAKAN AKUNTANSI MATERIAL (lanjutan)                 2.   MATERIAL ACCOUNTING POLICIES (continued)

     n.   Aset eksplorasi dan evaluasi                            n.   Exploration and evaluation assets

          Aktivitas eksplorasi dan evaluasi meliputi                   Exploration and evaluation activity involves
          mencari sumber daya mineral setelah Grup                     searching for mineral resources after the
          memperoleh        hak     hukum       untuk                  Group has obtained legal rights to explore in a
          mengeksplorasi suatu wilayah tertentu,                       specific area, determining the technical
          menentukan kelayakan teknis dan menilai                      feasibility and assessing the commercial
          komersial atas sumber daya mineral spesifik.                 viability of an identified resource.

          Pengeluaran    eksplorasi  dan   evaluasi                    Exploration and evaluation expenditure
          termasuk biaya yang berhubungan langsung                     includes costs that are directly attributable to:
          dengan:

          -     perolehan hak untuk eksplorasi;                        -     acquisition of rights to explore;
          -     kajian topografi, geologi, geokimia, dan               -     topographical, geological, geochemical
                geofisika;                                                   and geophysical studies;
          -     pengeboran eksplorasi;                                 -     exploratory drilling;
          -     pemaritan dan pengambilan contoh; dan                  -     trenching and sampling; and
          -     aktivitas yang terkait dengan evaluasi                 -     activities involved in evaluating the
                kelayakan teknis dan komersial atas                          technical feasibility and commercial
                penambangan sumber daya mineral.                             viability of extracting mineral resources.

          Biaya eksplorasi dan evaluasi yang                           Exploration and evaluation expenditure
          berhubungan dengan suatu area of interest                    related to an area of interest is written off as
          dibebankan pada saat terjadinya kecuali biaya                incurred, unless it is capitalised and carried
          tersebut dikapitalisasi dan ditangguhkan,                    forward, on an area of interest basis, provided
          berdasarkan area of interest, apabila                        that one of the following conditions is met:
          memenuhi salah satu dari ketentuan berikut
          ini:

          (i)   terdapat hak untuk mengeksplorasi dan                  (i)   the tenure rights of an area are current
                mengevaluasi suatu area dan biaya                            and it is considered probable that the
                tersebut diharapkan dapat diperoleh                          costs will be recouped through the
                kembali        melalui        keberhasilan                   successful development and exploitation
                pengembangan dan eksploitasi di area of                      of the area of interest or, alternatively,
                interest tersebut atau melalui penjualan                     through its sale; or
                atas area of interest tersebut; atau

          (ii) kegiatan eksplorasi dalam area of interest              (ii) exploration activities in the area of
               tersebut belum mencapai tahap yang                           interest have not yet reached a stage that
               memungkinkan       penentuan      adanya                     permits a reasonable assessment of the
               cadangan terbukti yang secara ekonomis                       existence or otherwise of economically
               dapat diperoleh, serta kegiatan yang aktif                   recoverable reserves and active and
               dan signifikan dalam atau berhubungan                        significant operations in or in relation to
               dengan area of interest tersebut masih                       the area of interest are ongoing.
               berlanjut.

          Biaya yang dikapitalisasi mencakup biaya-                    Capitalised costs include costs directly related
          biaya yang berkaitan langsung dengan                         to exploration and evaluation activities in the
          aktivitas eksplorasi dan evaluasi pada area of               relevant area of interest, and exclude physical
          interest yang relevan, tidak termasuk aset                   assets which are recorded in fixed assets.
          berwujud yang dicatat sebagai aset tetap.                    General and administrative costs are
          Biaya umum dan administrasi dialokasikan                     allocated to exploration or evaluation assets
          sebagai aset eksplorasi atau evaluasi hanya                  only to the extent that those costs can be
          jika biaya tersebut berkaitan langsung dengan                related directly to operational activities in the
          aktivitas operasional pada area of interest                  relevant area of interest.
          yang relevan.

          Pengeluaran eksplorasi dan evaluasi yang                     Capitalised exploration and evaluation
          dikapitalisasi dihapusbukukan ketika kondisi                 expenditure is written off where the above
          tersebut di atas tidak lagi terpenuhi.                       conditions are no longer satisfied.
Page 47
                                   PT ADARO ENERGY INDONESIA Tbk
                              DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                            Lampiran 5/35 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                            30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                         (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                  unless otherwise stated)

2.   KEBIJAKAN AKUNTANSI MATERIAL (lanjutan)                2.   MATERIAL ACCOUNTING POLICIES (continued)

     n.   Aset eksplorasi dan evaluasi (lanjutan)                n.   Exploration       and     evaluation      assets
                                                                      (continued)

          Aset eksplorasi dan evaluasi teridentifikasi                Identifiable exploration and evaluation assets
          yang diperoleh dalam suatu kombinasi bisnis                 acquired in a business combination are
          pada awalnya diakui sebagai aset pada nilai                 recognised initially as assets at fair value upon
          wajar pada saat akuisisi dan selanjutnya                    acquisition, and subsequently at cost less
          diukur pada biaya perolehan dikurangi                       impairment      charges.     Exploration      and
          kerugian penurunan nilai. Pengeluaran                       evaluation expenditure incurred subsequent to
          eksplorasi dan evaluasi yang terjadi setelah                the acquisition of an exploration asset in a
          perolehan aset eksplorasi dalam suatu                       business combination is accounted for in
          kombinasi bisnis dicatat dengan mengacu                     accordance with the policy outlined above.
          pada kebijakan akuntansi di atas.

          Oleh karena aset eksplorasi dan evaluasi tidak              As the exploration and evaluation assets are
          tersedia untuk digunakan, maka aset tersebut                not available for use, they are not depreciated.
          tidak disusutkan.

          Aset eksplorasi dan evaluasi diuji penurunan                Exploration and evaluation assets are
          nilainya   ketika    fakta    dan     kondisi               assessed for impairment if facts and
          mengindikasikan adanya penurunan nilai.                     circumstances indicate that impairment may
          Aset eksplorasi dan evaluasi juga diuji                     exist. Exploration and evaluation assets are
          penurunan nilainya ketika terjadi penemuan                  also tested for impairment once commercial
          cadangan komersial, sebelum aset tersebut                   reserves are found, before the assets are
          ditransfer ke “properti pertambangan -                      transferred to “mining properties - mines under
          tambang dalam pengembangan”.                                development”.

          Pengeluaran yang terjadi sebelum entitas                    Expenditure incurred before the entity
          memperoleh       hak       hukum    untuk                   obtained the legal right to explore a specific
          mengeksplorasi    suatu      area spesifik                  area is expensed as incurred.
          dibiayakan pada saat terjadinya.

     o.   Properti pertambangan                                  o.   Mining properties

          Biaya pengembangan yang dikeluarkan oleh                    Development expenditure incurred by or on
          atau atas nama Grup diakumulasikan secara                   behalf of the Group is accumulated separately
          terpisah untuk setiap area of interest pada                 for each area of interest in which economically
          saat cadangan terpulihkan yang secara                       recoverable resources have been identified.
          ekonomis dapat diidentifikasi. Biaya tersebut               Such expenditure includes costs directly
          termasuk biaya yang dapat diatribusikan                     attributable to the construction of mines and
          secara langsung pada konstruksi tambang                     related infrastructure and excludes physical
          dan infrastruktur terkait, tidak termasuk biaya             assets and land rights (i.e. right to build, right
          aset berwujud dan hak atas tanah (seperti hak               to cultivate and right to use), which are
          guna bangunan, hak guna usaha, dan hak                      recorded as fixed assets.
          pakai) yang dicatat sebagai aset tetap.

          Ketika keputusan pengembangan telah                         Once a development decision has been taken,
          diambil, jumlah tercatat aset eksplorasi dan                the carrying amount of the exploration and
          evaluasi pada area of interest tertentu                     evaluation assets in respect of the area of
          dipindahkan sebagai “tambang dalam                          interest is transferred to “mines under
          pengembangan”       pada     akun    properti               development” within mining properties and
          pertambangan      dan    digabung    dengan                 aggregated with the subsequent development
          pengeluaran       biaya       pengembangan                  expenditure.
          selanjutnya.

          “Tambang          dalam      pengembangan”                  “Mines under development” are reclassified as
          direklasifikasi ke “tambang yang berproduksi”               “mines in production” within mining properties
          pada akun properti pertambangan pada akhir                  at the end of the commissioning phase, when
          tahap komisioning, ketika tambang tersebut                  the mine is capable of operating in the manner
          dapat beroperasi sesuai dengan maksud                       intended by management.
          manajemen.
Page 48
                                   PT ADARO ENERGY INDONESIA Tbk
                              DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                            Lampiran 5/36 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                         NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                               FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                           30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                        (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                 unless otherwise stated)

2.   KEBIJAKAN AKUNTANSI MATERIAL (lanjutan)               2.   MATERIAL ACCOUNTING POLICIES (continued)

     o.   Properti pertambangan (lanjutan)                      o.   Mining properties (continued)

          “Tambang dalam pengembangan” tidak                         No amortisation is recognised for “mines under
          diamortisasi sampai direklasifikasi menjadi                development” until they are reclassified as
          “tambang yang berproduksi”.                                “mines in production”.

          Ketika timbul biaya pengembangan lebih                     When further development expenditure is
          lanjut atas properti pertambangan setelah                  incurred on a mining property after the
          dimulainya produksi, maka biaya tersebut                   commencement of production, the expenditure
          akan dicatat sebagai bagian dari “tambang                  is carried forward as part of “mines in
          yang     berproduksi”    apabila   terdapat                production” when it is probable that additional
          kemungkinan besar tambahan manfaat                         future economic benefits associated with the
          ekonomi masa depan sehubungan dengan                       expenditure will flow to the Group. Otherwise,
          biaya tersebut akan mengalir ke Grup.                      such expenditure is classified as a cost of
          Apabila tidak, biaya tersebut dibebankan                   production.
          sebagai biaya produksi.

          “Tambang yang berproduksi” (termasuk biaya                 “Mines in production” (including reclassified
          eksplorasi, evaluasi dan pengembangan,                     exploration, evaluation and any development
          serta pembayaran untuk memperoleh hak                      expenditure, and payments to acquire mineral
          penambangan dan sewa) diamortisasi                         rights and leases) are amortised using the
          dengan menggunakan metode unit produksi,                   units-of-production method, with separate
          dengan perhitungan terpisah yang dibuat                    calculations being made for each area of
          untuk setiap area of interest. “Tambang yang               interest. “Mines in production” will be depleted
          berproduksi” dideplesi menggunakan metode                  using the units-of-production method on the
          unit produksi berdasarkan cadangan terbukti                basis of proven and probable reserves.
          dan cadangan terduga.

          Properti pertambangan teridentifikasi yang                 Identifiable mining properties acquired in a
          diperoleh melalui suatu kombinasi bisnis pada              business combination are initially recognised
          awalnya diakui sebagai aset sebesar nilai                  as assets at their fair value. Development
          wajarnya. Pengeluaran pengembangan yang                    expenses incurred subsequent to the
          terjadi setelah akuisisi properti pertambangan             acquisition of the mining properties are
          dicatat berdasarkan kebijakan akuntansi yang               accounted for in accordance with the policy
          dijelaskan di atas.                                        outlined above.

          “Tambang dalam pengembangan” dan                           “Mines under development” and “mines in
          “tambang yang berproduksi” diuji penurunan                 production” are tested for impairment in
          nilainya dengan mengacu pada kebijakan                     accordance with the policy described in
          akuntansi pada Catatan 2m.                                 Note 2m.

     p.   Biaya pengupasan tanah                                p.   Stripping costs

          Biaya pengupasan lapisan tanah merupakan                   Stripping costs are the costs of removing
          biaya yang dikeluarkan untuk membuang                      overburden from a mine. Stripping costs
          tanah penutup suatu tambang. Biaya                         incurred in the development of a mine before
          pengupasan lapisan tanah yang terjadi pada                 production commences are capitalised as part
          tahap pengembangan tambang sebelum                         of the cost of developing the mine and are
          dimulainya produksi diakui sebagai biaya                   subsequently depleted using the units-of-
          pengembangan tambang dan akan dideplesi                    production method on the basis of proven and
          menggunakan     metode     unit    produksi                probable reserves.
          berdasarkan cadangan terbukti dan cadangan
          terduga.

          Aktivitas pengupasan lapisan tanah yang                    Stripping activity conducted during the
          terjadi selama tahap produksi mungkin                      production phase may provide two benefits
          memiliki dua manfaat untuk kepentingan                     that accrue to the Group: (i) coal that is
          Grup: (i) batubara yang dapat diproses untuk               processed into inventory in the current year;
          menjadi persediaan dalam periode berjalan;                 and (ii) improved access to the coal body in
          dan (ii) peningkatan akses ke badan batubara               future periods.
          di periode berikutnya.
Page 49
                                   PT ADARO ENERGY INDONESIA Tbk
                              DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                           Lampiran 5/37 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                        NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                              FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                          30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                       (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                unless otherwise stated)

2.   KEBIJAKAN AKUNTANSI MATERIAL (lanjutan)              2.   MATERIAL ACCOUNTING POLICIES (continued)

     p.   Biaya pengupasan tanah (lanjutan)                    p.   Stripping costs (continued)

          Sepanjang manfaat dari aktivitas pengupasan               To the extent that the benefit from the
          lapisan tanah dapat direalisasikan dalam                  stripping activity is realised in the form of
          bentuk persediaan yang diproduksi dalam                   inventory produced, the Group accounts for
          periode tersebut, Grup mencatat biaya atas                the costs of this stripping activity in
          aktivitas pengupasan lapisan tanah sesuai                 accordance with the principles of SFAS No.
          dengan prinsip PSAK No. 14, “Persediaan”.                 14, “Inventories”. To the extent the benefit is
          Sepanjang biaya pengupasan lapisan tanah                  improved access to the coal body, the Group
          memberikan manfaat peningkatan akses                      recognises these costs as a stripping activity
          menuju badan batubara di periode yang akan                asset if, and only if, all of the following criteria
          datang, Grup mencatat biaya tersebut sebagai              are met:
          aset aktivitas pengupasan lapisan tanah, jika
          dan hanya jika, memenuhi kriteria berikut:

          1.   Besar kemungkinan bahwa manfaat                      1.   It is probable that the future economic
               ekonomik masa depan (peningkatan                          benefit (improved access to the coal
               akses menuju badan batubara) yang                         body) associated with the stripping
               terkait dengan aktivitas pengupasan                       activity will flow to the Group;
               lapisan tanah akan mengalir kepada
               Grup;
          2.   Grup dapat mengidentifikasi komponen                 2.   The Group can identify the component of
               badan batubara yang aksesnya telah                        the coal body for which access has been
               ditingkatkan; dan                                         improved; and
          3.   Biaya aktivitas pengupasan lapisan tanah             3.   The costs relating to the stripping activity
               yang terkait dengan komponen tersebut                     associated with that component can be
               dapat diukur secara andal.                                measured reliably.

          Aset aktivitas pengupasan lapisan tanah pada              A stripping activity asset is initially measured
          awalnya diukur pada biaya perolehan, yang                 at cost, which represents the accumulation of
          merupakan akumulasi dari biaya-biaya yang                 costs directly incurred to perform stripping
          secara langsung terjadi untuk melakukan                   activity that improves access to the identified
          aktivitas pengupasan lapisan tanah yang                   component of the coal body, plus an allocation
          meningkatkan akses terhadap komponen                      of directly attributable overhead costs. If
          badan batubara yang teridentifikasi, ditambah             incidental operations are occurring at the
          alokasi biaya overhead          yang dapat                same time as the production stripping activity,
          diatribusikan secara langsung. Jika aktivitas             but are not necessary for the production
          insidentil terjadi pada saat yang bersamaan               stripping activity to continue as planned, the
          dengan pengupasan lapisan tanah tahap                     costs associated with these incidental
          produksi, namun aktivitas insidentil tersebut             operations are not included in the cost of the
          tidak harus ada untuk melanjutkan aktivitas               stripping activity asset.
          pengupasan lapisan tanah sebagaimana
          direncanakan, biaya yang terkait dengan
          aktivitas insidentil tersebut tidak dapat
          dimasukkan sebagai biaya perolehan aset
          aktivitas pengupasan lapisan tanah.

          Ketika biaya perolehan aset aktivitas                     When the costs of the stripping activity asset
          pengupasan lapisan tanah dan persediaan                   and the inventory produced are not separately
          yang diproduksi tidak dapat diidentifikasi                identifiable, the Group allocates the
          secara terpisah, Grup mengalokasikan biaya                production stripping costs between the
          pengupasan lapisan tanah dalam tahap                      inventory produced and the stripping activity
          produksi antara persediaan yang diproduksi                asset using an allocation basis that is based
          dan aset aktivitas pengupasan lapisan tanah               on a relevant production measure. This
          menggunakan dasar alokasi berdasarkan                     production measure is calculated for the
          ukuran produksi yang relevan. Ukuran                      identified component of the coal body, and is
          produksi tersebut dihitung untuk komponen                 used as a benchmark to identify the extent to
          badan batubara teridentifikasi, dan digunakan             which the additional activity of creating a
          sebagai patokan untuk mengidentifikasi                    future benefit has taken place. The Group
          sejauh mana aktivitas tambahan yang                       uses the expected volume of waste extracted
          menciptakan manfaat di masa depan telah                   compared with the actual volume for a given
          terjadi. Grup menggunakan ekspektasi                      volume of coal production.
          volume material sisa tambang yang diekstrak
          dibandingkan dengan volume aktual untuk
          setiap volume produksi batubara.
Page 50
                                   PT ADARO ENERGY INDONESIA Tbk
                              DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                           Lampiran 5/38 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                         NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                               FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                           30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                        (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                 unless otherwise stated)

2.   KEBIJAKAN AKUNTANSI MATERIAL (lanjutan)               2.   MATERIAL ACCOUNTING POLICIES (continued)

     p.   Biaya pengupasan tanah (lanjutan)                     p.   Stripping costs (continued)

          Setelah pengakuan awal, aset aktivitas                     Subsequently, the stripping activity asset is
          pengupasan        lapisan   tanah      dicatat             carried at cost less amortisation and
          menggunakan biaya perolehan dikurangi                      impairment losses, if any. The stripping activity
          dengan amortisasi dan rugi penurunan nilai,                asset       is     amortised      using      the
          jika ada. Aset aktivitas pengupasan lapisan                units-of-production method over the expected
          tanah diamortisasi menggunakan metode unit                 useful life of the identified component of the
          produksi selama ekspektasi masa manfaat                    coal body that becomes more accessible as a
          dari komponen badan batubara yang                          result of the stripping activity unless another
          teridentifikasi yang menjadi lebih mudah                   method is more appropriate.
          diakses sebagai akibat dari aktivitas lapisan
          pengupasan tanah, kecuali terdapat metode
          lain yang lebih tepat.

          Perubahan pada ekspektasi masa manfaat                     Changes to the expected useful life of the
          dari komponen badan batubara yang                          identified component of the coal body are
          teridentifikasi dinyatakan sebagai perubahan               considered changes in estimates and are
          atas estimasi dan dicatat menggunakan basis                accounted for on a prospective basis.
          prospektif.

          Aset aktivitas pengupasan lapisan tanah                    A stripping activity asset is accounted for as
          dicatat    sebagai    penambahan      atau                 an addition to, or enhancement of, an existing
          peningkatan dari aset yang ada, sehingga                   asset, and therefore is presented as part of
          disajikan sebagai “properti pertambangan”                  “mining properties” in the interim consolidated
          pada laporan posisi keuangan konsolidasian                 statements of financial position.
          interim.

          Aset aktivitas pengupasan lapisan tanah                    Any stripping activity asset is included in the
          dimasukan ke dalam basis biaya perolehan                   cost base of assets when determining a CGU
          aset saat penentuan UPK dalam tujuan                       for impairment assessment purposes.
          pengujian penurunan nilai.

          Pada tanggal laporan keuangan konsolidasian                As at the date of these interim consolidated
          interim ini, Grup tidak memiliki biaya                     financial statements, the Group did not have
          pengupasan lapisan tanah selama tahap                      stripping costs during the production phase
          produksi yang memenuhi kriteria untuk                      which qualify for deferral in accordance with
          ditangguhkan seperti yang ditetapkan dalam                 the Group’s accounting policies.
          kebijakan akuntansi Grup.

     q.   Investasi pada emas                                   q.   Investment in gold

          Investasi pada emas dimiliki untuk kenaikan                Investment in gold is held for capital
          nilai, daripada untuk digunakan atau dijual                appreciation, rather than for use or sale in the
          dalam kegiatan operasi normal.                             ordinary course of business.

          Investasi pada emas pada awalnya diakui                    Investment in gold is initially recognised at fair
          sebesar nilai wajar ditambah biaya transaksi.              value plus transaction costs. Subsequently, at
          Setelah pengakuan awal, setiap akhir periode               the end of each reporting period, investment
          pelaporan, investasi pada emas diukur pada                 in gold is measured at fair value and any
          nilai wajar dan setiap perubahan nilai wajar               changes in fair value are recognised in profit
          diakui dalam laba rugi.                                    or loss.

          Dikarenakan emas memiliki umur manfaat                     Since gold has an indefinite useful life, it is not
          tidak terbatas, maka emas tidak diamortisasi.              subject to amortisation.
Page 51
                                  PT ADARO ENERGY INDONESIA Tbk
                             DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                           Lampiran 5/39 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                  FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                              30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                           (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                    unless otherwise stated)

2.   KEBIJAKAN AKUNTANSI MATERIAL (lanjutan)              2.   MATERIAL ACCOUNTING POLICIES (continued)

     r.   Utang usaha                                          r.       Trade payables

          Utang usaha adalah kewajiban untuk                            Trade payables are obligations to pay for
          membayar barang atau jasa yang telah                          goods or services that have been acquired in
          diterima dalam kegiatan usaha normal dari                     the ordinary course of business from
          pemasok. Utang usaha diklasifikasikan                         suppliers. Trade payables are classified as
          sebagai liabilitas jangka pendek apabila                      current liabilities if payment is due within one
          pembayarannya jatuh tempo dalam waktu                         year of the reporting date. If not, they are
          satu tahun atau kurang setelah tanggal                        presented as non-current liabilities.
          pelaporan. Jika tidak, utang usaha tersebut
          disajikan sebagai liabilitas jangka panjang.

          Utang usaha pada awalnya diakui sebesar                       Trade payables are recognised initially at fair
          nilai wajar dan selanjutnya diukur pada biaya                 value and subsequently measured at
          perolehan diamortisasi dengan menggunakan                     amortised cost using the effective interest
          metode suku bunga efektif.                                    method.

     s.   Sewa                                                 s.       Leases

          Grup sebagai pesewa                                           The Group as a lessor

          Ketika Grup bertindak sebagai pesewa, Grup                    When the Group acts as a lessor, it will classify
          akan mengklasifikasi masing-masing sewanya                    each of its leases as either an operating lease
          baik sewa operasi atau sewa pembiayaan.                       or a finance lease.

          Untuk mengklasifikasi masing-masing sewa,                     To classify each lease, the Group makes an
          Grup membuat penilaian secara keseluruhan                     overall assessment of whether the lease
          atas apakah sewa mengalihkan secara                           transfers substantially all of the risks and
          substansial seluruh risiko dan manfaat yang                   rewards incidental to ownership of the
          terkait dengan kepemilikan aset pendasar.                     underlying asset. If this is the case, then the
          Jika penilaian membuktikan hal tersebut,                      lease is classified as a finance lease; if not,
          maka sewa diklasifikasikan sebagai sewa                       then it is an operating lease. Lease income
          pembiayaan; jika tidak, maka merupakan                        from operating lease where the Group acts as
          sewa operasi. Pendapatan sewa guna usaha                      a lessor is recognised as an income on a
          dari sewa operasi dimana Grup bertindak                       straight-line basis over the lease term.
          sebagai pesewa diakui sebagai pendapatan
          secara garis lurus selama masa sewa.

          Grup sebagai penyewa                                          The Group as a lessee

          Pada permulaan kontrak, Grup menilai                          At the inception of a contract, the Group
          apakah       kontrak     merupakan,    atau                   assesses whether the contract is, or contains,
          mengandung,        sewa.    Suatu   kontrak                   a lease. A contract is or contains a lease if the
          merupakan atau mengandung sewa jika                           contract conveys the right to control the use of
          kontrak tersebut memberikan hak untuk                         an identified asset for a period of time in
          mengendalikan         penggunaan       aset                   exchange for a consideration.
          identifikasian selama suatu jangka waktu
          untuk dipertukarkan dengan imbalan.
Page 52
                                   PT ADARO ENERGY INDONESIA Tbk
                              DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                           Lampiran 5/40 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                         NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                               FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                           30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                        (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                 unless otherwise stated)

2.   KEBIJAKAN AKUNTANSI MATERIAL (lanjutan)               2.   MATERIAL ACCOUNTING POLICIES (continued)

     s.   Sewa (lanjutan)                                       s.   Leases (continued)

          Grup sebagai penyewa (lanjutan)                            The Group as a lessee (continued)

          Untuk menilai apakah kontrak memberikan                    To assess whether a contract conveys the
          hak untuk mengendalikan penggunaan aset                    right to control the use of an identified asset,
          identifikasian, Grup akan menilai apakah:                  the Group will assess whether:

          -   Grup memiliki hak untuk mendapatkan                    -    The Group has the right to obtain
              secara substansial seluruh manfaat                          substantially all the economic benefits
              ekonomis       dari penggunaan  aset                        from the use of the asset throughout the
              identifikasian; dan                                         period of use; and
          -   Grup memiliki hak untuk mengarahkan                    -    The Group has the right to direct the use
              penggunaan aset identifikasian.                             of the asset.

          Pada tanggal permulaan sewa, Grup                          At the commencement date of the lease, the
          mengakui aset hak-guna dan liabilitas sewa.                Group recognises a right-of-use asset and a
          Aset hak-guna pada saat di awal, diukur pada               lease liability. The right-of-use asset is initially
          biaya perolehan, dimana meliputi:                          measured at cost, which comprises:

          -   jumlah pengukuran awal liabilitas sewa;                -    the initial amount of the lease liability;
          -   pembayaran sewa yang dilakukan pada                    -    lease payments made at or before the
              atau sebelum tanggal permulaan,                             commencement date, less any lease
              dikurangi dengan insentif sewa;                             incentive;
          -   biaya langsung awal yang dikeluarkan;                  -    initial direct costs incurred; and
              dan
          -   estimasi biaya yang akan dikeluarkan                   -    an estimate of costs to dismantle and
              untuk membongkar dan memindahkan                            remove the underlying asset to the
              aset pendasar atau untuk merestorasi                        condition required by the terms and
              aset pendasar ke kondisi yang                               conditions of the lease.
              disyaratkan oleh syarat dan ketentuan
              sewa.

          Untuk kontrak yang mengandung komponen                     For a contract that contains a lease
          sewa dan tambahan satu atau lebih komponen                 component and one or more additional lease
          sewa atau nonsewa, Grup mengalokasikan                     or non-lease components, the Group allocates
          imbalan dalam kontrak ke masing-masing                     the consideration in the contract to each lease
          komponen sewa dan nonsewa berdasarkan                      and non-lease component on the basis of their
          harga tersendiri relatif dari komponen sewa                relative standalone price of the lease
          dan harga tersendiri agregat dari komponen                 components and the aggregate standalone
          nonsewa.                                                   price of the non-lease components.

          Persyaratan sewa dinegosiasikan secara                     Lease terms are negotiated on individual
          individual dan berisi berbagai persyaratan dan             bases and contain a wide range of different
          ketentuan yang berbeda. Perjanjian sewa                    terms and conditions. The lease agreements
          tidak memberlakukan perjanjian apa pun                     do not impose any covenants other than the
          selain jaminan atas aset.                                  security over the assets.
Page 53
                                   PT ADARO ENERGY INDONESIA Tbk
                              DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                            Lampiran 5/41 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                            30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                         (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                  unless otherwise stated)

2.   KEBIJAKAN AKUNTANSI MATERIAL (lanjutan)                2.   MATERIAL ACCOUNTING POLICIES (continued)

     s.   Sewa (lanjutan)                                        s.   Leases (continued)

          Grup sebagai penyewa (lanjutan)                             The Group as a lessee (continued)

          Aset dan liabilitas yang timbul dari perjanjian             Assets and liabilities arising from lease
          sewa pada awalnya diukur pada nilai kini                    arrangements are initially measured at the
          pembayaran sewa yang belum dibayar pada                     present value of the lease payments that are
          tanggal permulaan, didiskontokan dengan                     not paid at the commencement date,
          menggunakan suku bunga implisit dalam                       discounted using the interest rate implicit in the
          sewa atau, jika suku bunga tersebut tidak                   lease or, if that rate cannot be readily
          dapat ditentukan, maka menggunakan suku                     determined, using the incremental borrowing
          bunga pinjaman inkremental. Pada umumnya,                   rate. Generally, the Group uses its incremental
          Grup menggunakan suku bunga pinjaman                        borrowing rate as the discount rate.
          inkremental sebagai tingkat bunga diskonto.

          Pembayaran sewa yang termasuk dalam                         Lease payments included in the measurement
          pengukuran    liabilitas sewa meliputi                      of the lease liability comprise the following:
          pembayaran berikut ini:

          -   pembayaran          tetap,       termasuk               -   fixed payments, including in-substance
              pembayaran tetap secara substansi                           fixed payments less any lease incentive
              dikurangi dengan piutang insentif sewa;                     receivable;
          -   pembayaran       sewa     variabel   yang               -   variable lease payments that depend on
              bergantung pada indeks atau suku bunga                      an index or a rate, initially measured using
              yang pada awalnya diukur dengan                             the index or rate as at the commencement
              menggunakan indeks atau suku bunga                          date;
              pada tanggal permulaan;
          -   jumlah     yang      diperkirakan    akan               -   amounts expected to be payable under a
              dibayarkan oleh penyewa dengan                              residual value guarantee;
              jaminan nilai residual;
          -   harga eksekusi opsi beli jika Grup cukup                -   the exercise price under a purchase
              pasti untuk mengeksekusi opsi tersebut;                     option that the Group is reasonably
              dan                                                         certain to exercise; and
          -   pembayaran penalti karena penghentian                   -   penalty payments for early termination of
              awal sewa kecuali jika Grup cukup pasti                     a lease unless the Group is reasonably
              untuk tidak menghentikan lebih awal.                        certain not to terminate early.

          Pembayaran sewa dialokasikan menjadi                        Each lease payment is allocated between the
          bagian pokok dan biaya keuangan. Biaya                      liability and finance cost. The finance cost is
          keuangan dibebankan pada laba rugi selama                   charged to profit or loss over the lease period
          periode sewa sehingga menghasilkan tingkat                  so as to produce a constant periodic rate of
          suku bunga periodik yang konstan atas saldo                 interest on the remaining balance of the
          liabilitas untuk setiap periode.                            liability for each period.

          Grup menyajikan aset hak-guna sebagai                       The Group presents right-of-use assets as part
          bagian dari “Aset tetap” di dalam laporan                   of “Fixed assets” in the interim consolidated
          posisi keuangan konsolidasian interim. Aset                 statements of financial position. Right-of-use
          hak-guna juga diuji penurunan nilainya                      assets are also tested for impairment in
          dengan mengacu pada kebijakan akuntansi                     accordance with the policy described in
          pada Catatan 2m.                                            Note 2m.
Page 54
                                  PT ADARO ENERGY INDONESIA Tbk
                             DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                           Lampiran 5/42 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                         NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                               FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                           30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                        (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                 unless otherwise stated)

2.   KEBIJAKAN AKUNTANSI MATERIAL (lanjutan)               2.   MATERIAL ACCOUNTING POLICIES (continued)

     s.   Sewa (lanjutan)                                       s.   Leases (continued)

          Grup sebagai penyewa (lanjutan)                            The Group as a lessee (continued)

          Aset   hak-guna     umumnya      disusutkan                Right-of-use assets are generally depreciated
          sepanjang waktu yang lebih pendek antara                   over the shorter of the asset’s useful life and
          lama masa manfaat aset dan jangka waktu                    the lease term on a straight-line basis. If the
          sewa menggunakan metode garis lurus. Jika                  Group is reasonably certain to exercise a
          Grup cukup yakin untuk melaksanakan opsi                   purchase option, the right-of-use asset is
          pembelian, aset hak-guna disusutkan selama                 depreciated over the underlying asset’s useful
          masa manfaat aset yang mendasarinya.                       life.

          Sewa jangka pendek dan sewa yang aset                      Short-term leases and low-value asset leases
          pendasarnya bernilai rendah

          Grup memutuskan untuk tidak mengakui aset                  The Group has elected not to recognise right-
          hak-guna dan liabilitas sewa untuk sewa                    of-use assets and lease liabilities for short-
          jangka pendek yang memiliki masa sewa 12                   term leases that have a lease term of 12
          bulan atau kurang dan sewa yang aset                       months or less and leases of low-value assets.
          pendasarnya bernilai rendah. Grup mengakui                 The Group recognises the lease payments
          pembayaran sewa atas sewa tersebut sebagai                 associated with these leases as an expense
          beban dengan dasar garis lurus selama masa                 on a straight-line basis over the lease term.
          sewa.

          Modifikasi sewa                                            Lease modification

          Grup mencatat modifikasi sewa sebagai sewa                 The Group accounts for a lease modification
          terpisah jika:                                             as a separate lease if:

          -   modifikasi meningkatkan ruang lingkup                  -   the modification increases the scope of
              sewa dengan menambahkan hak untuk                          the lease by adding the right to use one or
              menggunakan satu aset pendasar atau                        more underlying assets; and
              lebih; dan
          -   imbalan sewa meningkat sebesar jumlah                  -   the consideration for the lease increases
              yang setara dengan harga tersendiri                        by an amount commensurate with the
              untuk peningkatan dalam ruang lingkup                      standalone price for the increase in scope
              dan penyesuaian yang tepat pada harga                      and any appropriate adjustments to that
              tersendiri tersebut untuk merefleksikan                    standalone     price    to    reflect   the
              kondisi kontrak tertentu.                                  circumstances of the particular contract.

          Untuk modifikasi sewa yang tidak dicatat                   For a lease modification that is not accounted
          sebagai sewa terpisah, pada tanggal efektif                for as a separate lease, at the effective date of
          modifikasi sewa, Grup:                                     the lease modification, the Group:

          -   mengukur kembali dan mengalokasikan                    -   remeasures          and     allocates      the
              imbalan kontrak modifikasian;                              consideration in the modified contract;
          -   menentukan masa sewa dari sewa                         -   determines the lease term of the modified
              modifikasian;                                              lease;
          -   mengukur kembali liabilitas sewa dengan                -   remeasures the lease liability by
              mendiskontokan      pembayaran      sewa                   discounting the revised lease payments
              revisian menggunakan tingkat diskonto                      using a revised discount rate. At the
              revisian. Pada tanggal efektif modifikasi,                 effective date of the modification, the
              tingkat diskonto revisian ditentukan                       revised discount rate is determined as the
              sebagai      suku    bunga      pinjaman                   Group’s incremental borrowing rate for
              inkremental Grup untuk sisa masa sewa;                     the remainder of the lease term;
          -   menurunkan jumlah tercatat aset hak-                   -   decreases the carrying amount of the
              guna untuk merefleksikan penghentian                       right-of-use asset to reflect the partial or
              sebagian atau sepenuhnya sewa untuk                        full termination of the lease for lease
              modifikasi sewa yang menurunkan ruang                      modifications that decrease the scope of
              lingkup sewa. Grup mengakui dalam laba                     the lease. The Group recognises in profit
              rugi setiap keuntungan atau kerugian                       or loss any gain or loss relating to the
              yang     terkait  dengan     penghentian                   partial or full termination of the lease; and
              sebagian     atau   sepenuhnya      sewa
              tersebut; dan
          -   membuat penyesuaian terkait aset hak-                  -   makes a corresponding adjustment to the
              guna untuk seluruh modifikasi sewa                         right-of-use asset for all other lease
              lainnya.                                                   modifications.
Page 55
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/43 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                  30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                               (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                        unless otherwise stated)

2.   KEBIJAKAN AKUNTANSI MATERIAL (lanjutan)                  2.   MATERIAL ACCOUNTING POLICIES (continued)

     t.   Provisi                                                  t.       Provisions

          i.   Provisi pembongkaran, rehabilitasi,                          i.   Provision for decommissioning, mine
               reklamasi dan penutupan tambang                                   rehabilitation, reclamation and mine
                                                                                 closure

               Reklamasi, rehabilitasi, dan biaya                                Reclamation,       rehabilitation   and
               lingkungan yang berkaitan dengan                                  environmental expenditure to be incurred
               pemulihan atas area yang terganggu                                related to the remediation of disturbed
               selama tahap produksi dibebankan pada                             areas during the production phase are
               beban pokok pendapatan pada saat                                  charged to the cost of revenue when an
               kewajiban dari pemulihan atas area yang                           obligation arising from the disturbance
               terganggu tersebut timbul selama                                  occurs as extraction progresses.
               penambangan.

               Kewajiban ini diakui sebagai liabilitas                           These obligations are recognised as
               pada saat timbulnya kewajiban hukum                               liabilities when a legal or constructive
               atau konstruktif yang berasal dari aktivitas                      obligation has arisen from activities that
               yang telah dilaksanakan. Kewajiban ini                            have already been performed. This
               diukur pada saat dan setelah pengakuan                            obligation is initially and subsequently
               sebesar nilai kini dari perkiraan                                 measured at the present value of the
               pengeluaran yang diperlukan untuk                                 expenditure expected to be required to
               menyelesaikan         kewajiban     dengan                        settle the obligation using a pre-tax rate,
               menggunakan tingkat diskonto sebelum                              which       reflects    current     market
               pajak, yang mencerminkan penilaian                                assessments of the time value of money
               pasar kini atas nilai waktu uang dan risiko                       and the risks specific to the obligation.
               yang terkait dengan kewajiban tersebut.                           Changes in the measurement of a liability
               Perubahan pada pengukuran kewajiban                               which arise during production are also
               yang timbul selama tahap produksi juga                            charged to the cost of revenue, while the
               dibebankan ke beban pokok pendapatan,                             increase in the provision due to the
               sementara peningkatan kewajiban yang                              passage of time is recognised as finance
               sehubungan dengan berlalunya waktu                                costs.
               diakui sebagai biaya keuangan.

               Provisi pembongkaran aset-aset tambang                            Provision for decommissioning of mining
               dan kegiatan pascatambang terkait                                 assets and related post-mining activities,
               beserta peninggalan dan pembongkaran                              as well as the abandonment and
               aset-aset berumur panjang dibentuk                                decommissioning of other long-lived
               sehubungan dengan kewajiban hukum                                 assets, is made for the legal obligations
               berkaitan    dengan    penarikan     aset                         associated with the retirement of mining
               tambang terkait dan aset berumur                                  related assets and other long-lived assets
               panjang lainnya termasuk pembongkaran                             including the decommissioning of
               bangunan, peralatan, fasilitas peremukan                          buildings, equipment, crushing and
               dan pengolahan, infrastruktur, dan                                handling facilities, infrastructure and
               fasilitas lainnya yang berasal dari                               other facilities that resulted from the
               pembelian,         konstruksi       atau                          acquisition, construction or development
               pengembangan aset tersebut.                                       of such assets.

               Kewajiban ini diakui sebagai liabilitas                           These obligations are recognised as
               pada saat timbulnya kewajiban hukum                               liabilities when a legal or constructive
               atau konstruktif yang berkaitan dengan                            obligation with respect to the retirement of
               penarikan     sebuah       aset,   dengan                         an asset is incurred, with initial and
               pengukuran pada saat dan setelah                                  subsequent       measurement        of  the
               pengakuan sebesar nilai kini dari                                 obligation at the present value of the
               perkiraan pengeluaran yang diperlukan                             expenditure expected to be required to
               untuk menyelesaikan kewajiban dengan                              settle the obligation using a pre-tax rate
               menggunakan tingkat diskonto sebelum                              that reflects current market assessments
               pajak, yang mencerminkan penilaian                                of the time value of money and the risks
               pasar kini atas nilai waktu uang dan risiko                       specific to the obligation.
               yang terkait dengan kewajiban tersebut.
Page 56
                                     PT ADARO ENERGY INDONESIA Tbk
                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/44 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                  30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                               (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                        unless otherwise stated)

2.   KEBIJAKAN AKUNTANSI MATERIAL (lanjutan)                  2.   MATERIAL ACCOUNTING POLICIES (continued)

     t.   Provisi (lanjutan)                                       t.       Provisions (continued)

          i.    Provisi pembongkaran, rehabilitasi,                         i.    Provision for decommissioning, mine
                reklamasi dan penutupan tambang                                   rehabilitation, reclamation and mine
                (lanjutan)                                                        closure (continued)

                Biaya penarikan aset dalam jumlah yang                            An asset retirement cost equivalent to
                setara dengan jumlah liabilitas tersebut                          these liabilities is capitalised as part of the
                dikapitalisasi sebagai bagian dari suatu                          related asset’s carrying amount, and is
                aset tertentu dan kemudian disusutkan                             subsequently depreciated or depleted
                atau dideplesi selama masa manfaat aset                           over the asset’s useful life. The increase
                tersebut.      Peningkatan    kewajiban                           in these obligations due to the passage of
                sehubungan dengan berlalunya waktu                                time is recognised as part of finance
                diakui dalam biaya keuangan.                                      costs.

                Perubahan dalam pengukuran kewajiban                              The changes in the measurement of
                pembongkaran       yang     timbul     dari                       decommissioning obligations that result
                perubahan estimasi waktu atau jumlah                              from changes in the estimated timing or
                pengeluaran sumber daya ekonomis                                  amount of the outflow of resources
                (contohnya: arus kas) yang diperlukan                             embodying economic benefits (e.g. cash
                untuk menyelesaikan kewajiban tersebut,                           flow) required to settle the obligations, or
                atau perubahan dalam tingkat diskonto,                            a change in the discount rate, will be
                akan       ditambahkan      pada      atau                        added to or deducted from the cost of the
                dikurangkan dari, harga perolehan aset                            related asset in the current period. The
                yang      bersangkutan    pada     periode                        amount deducted from the cost of the
                berjalan. Jumlah yang dikurangkan dari                            asset should not exceed its carrying
                harga perolehan aset tidak boleh melebihi                         amount. If a decrease in the liability
                jumlah tercatatnya. Jika penurunan dalam                          exceeds the carrying amount of the asset,
                liabilitas melebihi nilai tercatat aset,                          the excess is recognised immediately in
                kelebihan tersebut segera diakui dalam                            profit or loss. If the adjustment results in
                laba rugi. Jika penyesuaian tersebut                              an addition to the cost of an asset, the
                menghasilkan penambahan pada harga                                Group will consider whether this is an
                perolehan       aset,      Grup      akan                         indication that the new carrying amount of
                mempertimbangkan apakah hal ini                                   the asset may not be fully recoverable. If
                mengindikasikan bahwa nilai tercatat aset                         there is any such indication, the Group
                yang baru mungkin tidak bisa dipulihkan                           will test the asset for impairment by
                secara penuh. Jika terdapat indikasi                              estimating its recoverable amount and
                tersebut, Grup akan melakukan pengujian                           will account for any impairment losses
                penurunan nilai terhadap aset tersebut                            incurred.
                dengan melakukan estimasi atas nilai
                yang dapat dipulihkan dan akan
                memperhitungkan setiap kerugian dari
                penurunan nilai yang terjadi.

          ii.   Provisi lain-lain                                           ii.   Other provisions

                Provisi untuk biaya restrukturisasi,                              Provisions for restructuring costs, legal
                tuntutan hukum, atau hal-hal yang                                 claims, or environmental issues that may
                berkaitan dengan lingkungan yang tidak                            not involve the retirement of an asset,
                berkaitan dengan penghentian aset,                                reclamation and closure of mining areas
                reklamasi,   dan     penutupan     area                           and others are recognised when:
                pertambangan dan lainnya diakui ketika:

                   Grup memiliki kewajiban hukum atau                                the Group has a present legal or
                    konstruktif saat kini sebagai akibat                               constructive obligation as a result of
                    dari peristiwa masa lalu;                                          past events;
                   kemungkinan arus keluar sumber                                    it is probable that an outflow of
                    daya          diperlukan      untuk                                resources will be required to settle
                    menyelesaikan kewajiban tersebut;                                  the obligation; and
                    dan
                   jumlahnya dapat diestimasi secara                                 the amount         can     be    reliably
                    andal.                                                             estimated.
Page 57
                                     PT ADARO ENERGY INDONESIA Tbk
                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                               Lampiran 5/45 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                 NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                       FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                   30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                                (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                         unless otherwise stated)

2.   KEBIJAKAN AKUNTANSI MATERIAL (lanjutan)                   2.   MATERIAL ACCOUNTING POLICIES (continued)

     t.   Provisi (lanjutan)                                        t.       Provisions (continued)

          ii.   Provisi lain-lain (lanjutan)                                 ii.   Other provisions (continued)

                Jika terdapat sejumlah kewajiban serupa,                           Where there are a number of similar
                maka kemungkinan arus keluar untuk                                 obligations, the likelihood that an outflow
                menyelesaikan         kewajiban     tersebut                       will be required in settlement is
                ditentukan dengan mempertimbangkan                                 determined by considering the class of
                secara keseluruhan kelompok kewajiban.                             obligations as a whole. Although the
                Walaupun kemungkinan arus keluar                                   likelihood of an outflow in respect of any
                sehubungan         dengan     setiap     pos                       one item may be small, it is probable that
                kewajiban tersebut kecil, terdapat                                 some outflow of resources will be needed
                kemungkinan besar dibutuhkan arus                                  to settle the class of obligations as a
                keluar sumber daya untuk menyelesaikan                             whole. If that is the case, a provision is
                kelompok kewajiban secara keseluruhan.                             recognised.
                Jika hal itu terjadi, maka provisi diakui.

                Provisi diukur pada nilai kini dari estimasi                       The provision is measured at the present
                terbaik manajemen atas pengeluaran                                 value of management’s best estimate of
                yang diperlukan untuk menyelesaikan                                the expenditure expected to be required
                kewajiban dengan menggunakan tingkat                               to settle the present obligation using a
                diskonto     sebelum       pajak,       yang                       pre-tax rate that reflects current market
                mencerminkan penilaian pasar kini atas                             assessments of the time value of money
                nilai waktu uang dan risiko yang terkait                           and the risks specific to the liability. The
                dengan liabilitas yang bersangkutan.                               increase in the provision due to the
                Peningkatan provisi sehubungan dengan                              passage of time is recognised as part of
                berlalunya waktu diakui sebagai bagian                             finance costs.
                dari biaya keuangan.

     u.   Pinjaman                                                  u.       Borrowings

          Pinjaman diakui pada awalnya sebesar nilai                         Borrowings are recognised initially at their fair
          wajar, dikurangi dengan biaya transaksi yang                       value, net of any transaction costs incurred.
          terjadi. Pinjaman kemudian dicatat sebesar                         Borrowings are subsequently carried at
          biaya perolehan diamortisasi, dengan selisih                       amortised cost, with any difference between
          antara hasil perolehan (dikurangi dengan                           the proceeds (net of transaction costs) and the
          biaya transaksi) dan nilai penarikan diakui                        redemption value recognised in profit or loss
          dalam laba rugi selama periode pinjaman                            over the period of the borrowing, using the
          dengan menggunakan metode suku bunga                               effective interest method.
          efektif.

          Biaya-biaya yang dibayar untuk mendapatkan                         Fees paid on the establishment of loan
          fasilitas pinjaman diakui sebagai biaya                            facilities are recognised as transaction costs
          transaksi pinjaman tersebut, apabila besar                         of the loan to the extent that it is probable that
          kemungkinan akan dilakukan penarikan atas                          some or all of the facilities will be drawn down.
          sebagian atau seluruh fasilitas tersebut.                          In this case, the fee is deferred until the
          Dalam hal ini, biaya tersebut ditangguhkan                         drawdown occurs. To the extent that there is
          sampai dilakukan penarikan. Apabila tidak                          no evidence that it is probable that some or all
          terdapat bukti bahwa kemungkinan besar                             of the facility will be drawn down, the fee is
          akan dilakukan penarikan atas sebagian atau                        capitalised as a prepayment for financing
          seluruh fasilitas tersebut, biaya tersebut                         costs and amortised over the period of the
          dikapitalisasi sebagai biaya dibayar dimuka                        facility to which it relates. Borrowings are
          untuk biaya keuangan dan diamortisasi                              classified as current liabilities unless the
          selama periode fasilitas terkait. Pinjaman                         Group has a right at the end of the reporting
          diklasifikasikan sebagai liabilitas jangka                         period to defer the settlement of the liability for
          pendek kecuali Grup memiliki hak pada akhir                        at least 12 months from the reporting date.
          periode       pelaporan   untuk    menunda
          pembayaran liabilitas selama paling tidak 12
          bulan dari tanggal pelaporan.
Page 58
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                             Lampiran 5/46 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                           NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                 FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                             30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                          (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                   unless otherwise stated)

2.   KEBIJAKAN AKUNTANSI MATERIAL (lanjutan)                 2.   MATERIAL ACCOUNTING POLICIES (continued)

     v.   Biaya pinjaman                                          v.   Borrowing costs

          Biaya pinjaman baik yang secara langsung                     Borrowing costs either directly or indirectly
          ataupun tidak langsung dapat diatribusikan                   attributable to the acquisition, construction or
          dengan akuisisi, konstruksi atau produksi aset               production of a qualifying asset are capitalised
          kualifikasian, dikapitalisasi sebagai bagian                 as part of the cost of that asset until such time
          biaya perolehan aset tersebut sampai aset                    as the asset is substantially ready for its
          tersebut siap untuk digunakan sesuai dengan                  intended use or sale. For borrowings directly
          maksudnya atau dijual. Untuk pinjaman yang                   attributable to a qualifying asset, the amount
          dapat diatribusi secara langsung pada suatu                  to be capitalised is determined as the actual
          aset kualifikasian, jumlah yang dikapitalisasi               borrowing costs incurred during the year, less
          adalah sebesar biaya pinjaman yang terjadi                   any income earned on the temporary
          selama       periode     berjalan,   dikurangi               investment of such borrowings. For
          pendapatan investasi lain-lain dari pinjaman                 borrowings that are not directly attributable to
          tersebut. Untuk pinjaman yang tidak dapat                    a qualifying asset, the amount to be
          diatribusi secara langsung pada suatu aset                   capitalised is determined by applying a
          kualifikasian, jumlah biaya pinjaman yang                    capitalisation rate to the amount spent on the
          dikapitalisasi ditentukan dengan mengalikan                  qualifying asset. An entity shall cease
          tingkat kapitalisasi dengan pengeluaran untuk                capitalising     borrowing        costs     when
          aset kualifikasian. Entitas menghentikan                     substantially all of the activities necessary to
          kapitalisasi biaya pinjaman ketika secara                    prepare the qualifying assets are complete.
          substansial seluruh aktivitas yang diperlukan
          untuk mempersiapkan aset kualifikasian telah
          selesai.

          Semua biaya pinjaman lainnya diakui dalam                    All other borrowing costs are recognised in
          laba rugi pada periode dimana biaya-biaya                    profit or loss in the period in which they are
          tersebut terjadi.                                            incurred.

     w.   Imbalan kerja karyawan                                  w.   Employee benefits

          i.   Imbalan pasca kerja                                     i.   Post-employment benefits

               Skema pensiun diklasifikasikan sebagai                       Pension schemes are classified as either
               program iuran pasti atau program imbalan                     defined contribution plans or defined
               pasti, tergantung pada substansi ekonomi                     benefit plans, depending on the
               dari syarat dan kondisi utama program                        economic substance of the plan as
               tersebut.                                                    derived from its principal terms and
                                                                            conditions.

               Program iuran pasti adalah program                           A defined contribution plan is a pension
               pensiun      yang     mewajibkan     Grup                    plan under which the Group pays fixed
               membayar sejumlah iuran tertentu                             contributions into a separate entity. The
               kepada entitas terpisah. Grup tidak                          Group has no legal or constructive
               memiliki     kewajiban      hukum    atau                    obligations to pay further contributions if
               konstruktif untuk membayar iuran lebih                       the fund does not hold sufficient assets to
               lanjut jika entitas tersebut tidak memiliki                  pay all employees the benefits relating to
               aset yang cukup untuk membayar seluruh                       employee service in the current and prior
               imbalan atas jasa yang diberikan pekerja                     years.
               pada periode berjalan dan tahun-tahun
               sebelumnya.

               Program imbalan pasti adalah program                         A defined benefit plan is a pension plan
               pensiun yang bukan merupakan program                         that is not a defined contribution plan.
               iuran pasti. Program imbalan pasti adalah                    Typically, defined benefit plans define an
               program pensiun yang menentukan                              amount of pension benefit that an
               jumlah imbalan pensiun yang akan                             employee will receive upon retirement,
               diterima seorang pekerja pada saat                           usually dependent on one or more factors
               pensiun, biasanya berdasarkan pada satu                      such as age, years of service and
               atau lebih faktor seperti usia, masa kerja,                  compensation.
               dan kompensasi.
Page 59
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/47 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                  FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                              30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                           (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                    unless otherwise stated)

2.   KEBIJAKAN AKUNTANSI MATERIAL (lanjutan)                  2.   MATERIAL ACCOUNTING POLICIES (continued)

     w.   Imbalan kerja karyawan (lanjutan)                        w.   Employee benefits (continued)

          i.   Imbalan pasca kerja (lanjutan)                           i.   Post-employment benefits (continued)

               Grup harus mencadangkan jumlah                                The Group is required to provide a
               minimal imbalan pensiun sesuai dengan                         minimum amount of pension benefit in
               peraturan ketenagakerjaan pada hukum                          accordance     with     the   manpower
               yang berlaku di Indonesia (“Peraturan                         regulations on the applicable law in
               Ketenagakerjaan”) atau Perjanjian Kerja                       Indonesia (“Manpower Regulations”) or
               Bersama     (“PKB”)   atau    Peraturan                       the Group’s Collective Labour Agreement
               Perusahaan (“PP”), mana yang lebih                            (the “CLA”) or Company Regulation
               tinggi.        Karena         Peraturan                       (“CR”), whichever is higher. Since the
               Ketenagakerjaan atau PKB atau PP                              Manpower Regulations or the CLA or the
               menentukan rumus tertentu untuk                               CR sets the formula for determining the
               menghitung jumlah minimal imbalan                             minimum amount of benefits, in
               pensiun, pada dasarnya, program                               substance pension plans under the
               pensiun      berdasarkan      Peraturan                       Manpower Regulations or the CLA or the
               Ketenagakerjaan atau PKB atau PP                              CR represent defined benefit plans.
               adalah program imbalan pasti.

               Sehubungan dengan program imbalan                             The liability recognised in the interim
               pasti, liabilitas diakui pada laporan posisi                  consolidated statements of financial
               keuangan konsolidasian interim setara                         position in respect of defined benefit
               dengan nilai kini kewajiban imbalan pasti                     pension plans is equivalent to the present
               pada akhir periode/tahun pelaporan                            value of the defined benefit obligation at
               dikurangi nilai wajar aset program.                           the end of the reporting period/year less
               Kewajiban imbalan pasti dihitung setiap                       the fair value of plan assets. The defined
               tahun oleh aktuaris independen dengan                         benefit obligation is calculated annually
               menggunakan metode Projected Unit                             by independent actuaries using the
               Credit.                                                       Projected Unit Credit method.

               Nilai kini kewajiban imbalan pasti                            The present value of the defined benefit
               ditentukan dengan mendiskontokan arus                         obligation is determined by discounting
               kas keluar yang diestimasi dengan                             the estimated future cash outflows using
               menggunakan tingkat bunga obligasi                            the interest rates of high-quality corporate
               korporat    berkualitas tinggi  dalam                         bonds that are denominated in the
               denominasi mata uang dimana imbalan                           currency in which the benefits will be
               akan dibayarkan dan memiliki jangka                           paid, and that have terms of maturity
               waktu jatuh tempo mendekati jangka                            approximating the terms of the related
               waktu kewajiban pensiun. Apabila tidak                        pension obligations. When there is no
               terdapat pasar aktif untuk obligasi                           deep market for such bonds, the market
               korporat tersebut, digunakan bunga                            rates of government bonds are used.
               obligasi pemerintah.

               Biaya jasa lalu diakui segera dalam laba                      Past service costs are recognised
               rugi. Keuntungan dan kerugian atas                            immediately in profit or loss. Gains or
               kurtailmen atau penyelesaian suatu                            losses on the curtailment or settlement of
               program imbalan pasti diakui pada saat                        a defined benefit plan are recognised
               kurtailmen atau penyelesaian tersebut                         when the curtailment or settlement
               terjadi.                                                      occurs.

               Pengukuran kembali yang timbul dari                           Remeasurements          arising   from
               penyesuaian pengalaman dan perubahan                          experience adjustments and changes in
               asumsi-asumsi aktuarial dibebankan atau                       actuarial assumptions are charged or
               dikreditkan pada ekuitas dalam laporan                        credited to equity in the statement of
               penghasilan komprehensif lain pada                            other comprehensive income in the
               periode/tahun dimana beban tersebut                           period/year in which they arise. The
               terjadi. Akumulasi saldo pengukuran                           accumulated remeasurements balance is
               kembali dilaporkan di saldo laba.                             reported in retained earnings.
Page 60
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                             Lampiran 5/48 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                            30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                         (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                  unless otherwise stated)

2.   KEBIJAKAN AKUNTANSI MATERIAL (lanjutan)                2.   MATERIAL ACCOUNTING POLICIES (continued)

     w.   Imbalan kerja karyawan (lanjutan)                      w.   Employee benefits (continued)

          i.    Imbalan pasca kerja (lanjutan)                        i.    Post-employment benefits (continued)

                Untuk program iuran pasti, Grup                             For defined contribution plans, the Group
                membayar iuran untuk program jaminan                        pays contributions for old age protection
                hari tua dan jaminan pensiun yang                           and     pension    protection     to   the
                dikelola oleh Pemerintah, dengan dasar                      Government      administered       pension
                kewajiban. Grup tidak memiliki kewajiban                    insurance plans on a mandatory basis.
                membayar lebih lanjut jika iuran tersebut                   The Group has no further payment
                telah dibayarkan. Iuran tersebut diakui                     obligations once the contributions have
                sebagai beban imbalan kerja ketika jatuh                    been paid. The contributions are
                tempo. Iuran dibayar dimuka diakui                          recognised     as    employee       benefit
                sebagai aset sepanjang pengembalian                         expenses when they become due.
                dana atau pengurangan pembayaran                            Prepaid contributions are recognised as
                masa depan dimungkinkan.                                    an asset to the extent that a cash refund
                                                                            or reduction in future payments is
                                                                            available.

          ii.   Pesangon pemutusan kontrak kerja                      ii.   Termination benefits

                Pesangon pemutusan kontrak kerja                            Termination benefits are payable when
                dibayarkan ketika pekerja diberhentikan,                    employment is terminated by the Group
                atau ketika pekerja menerima tawaran                        or when the employee accepts a
                imbalan dari entitas atas terminasi                         compensation offer from the entity for
                kontrak kerja. Grup mengakui pesangon                       terminating the employment contract.
                pemutusan kontrak kerja pada tanggal                        The Group recognises termination
                yang lebih dahulu dari: (i) ketika Grup                     benefits at the earlier of the following
                tidak bisa lagi membatalkan penawaran                       dates: (i) when the Group can no longer
                pesangon; dan (ii) ketika Grup mengakui                     withdraw the offer of those benefits; and
                biaya untuk restrukturisasi yang berada                     (ii) when the Group recognises costs for
                dalam lingkup PSAK No. 57, “Provisi,                        a restructuring that is within the scope of
                Liabilitas    Kontinjensi   dan     Aset                    SFAS No. 57, “Provisions, Contingent
                Kontinjensi” dan melibatkan pembayaran                      Liabilities and Contingent Assets” and
                pesangon pemutusan kontrak kerja.                           involves the payment of termination
                Dalam hal pekerja menerima tawaran                          benefits. In the case the employee
                imbalan dari entitas atas terminasi                         accepts an offer of compensation from
                kontrak kerja, pesangon pemutusan                           the entity upon termination of the
                kontrak    kerja    diukur  berdasarkan                     employment contract, the termination
                ekspektasi jumlah karyawan yang                             benefits are measured based on the
                menerima        penawaran       tersebut.                   number of employees expected to accept
                Pesangon pemutusan kontrak kerja yang                       the offer. Benefits falling due more than
                jatuh tempo lebih dari 12 bulan setelah                     12 months after the reporting date are
                tanggal pelaporan didiskontokan ke nilai                    discounted to their present value.
                kini.

     x.   Modal saham                                            x.   Share capital

          Saham biasa dikelompokkan sebagai ekuitas,                  Ordinary shares are classified as equity, and
          dan biaya langsung yang berkaitan dengan                    incremental costs directly attributable to the
          penerbitan saham baru atau opsi disajikan                   issuance of new shares or options are shown
          sebagai pengurang ekuitas, setelah dikurangi                in equity as a deduction, net of tax, from the
          pajak, dari jumlah yang diterima.                           proceeds.
Page 61
                                     PT ADARO ENERGY INDONESIA Tbk
                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/49 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                  30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                               (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                        unless otherwise stated)

2.   KEBIJAKAN AKUNTANSI MATERIAL (lanjutan)                  2.   MATERIAL ACCOUNTING POLICIES (continued)

     y.    Saham treasuri                                          y.       Treasury shares

           Ketika Perusahaan membeli modal saham                            When       the    Company       purchases      the
           ekuitas Perusahaan (saham treasuri), imbalan                     Company’s equity share capital (treasury
           yang dibayar, termasuk biaya tambahan yang                       shares), the consideration paid, including any
           secara     langsung      dapat    diatribusikan                  directly attributable incremental costs (net of
           (dikurangi pajak penghasilan) dikurangkan                        income taxes) is deducted from equity
           dari ekuitas yang diatribusikan kepada pemilik                   attributable to the Company’s equity holders
           ekuitas Perusahaan sampai saham tersebut                         until the shares are cancelled or reissued.
           dibatalkan atau diterbitkan kembali. Ketika                      Where such ordinary shares are subsequently
           saham biasa tersebut selanjutnya diterbitkan                     reissued, any consideration received, net of
           kembali, imbalan yang diterima, dikurangi                        any      directly    attributable     incremental
           biaya tambahan transaksi yang terkait dan                        transaction costs and the related income tax
           dampak pajak penghasilan yang terkait                            effects, is included in equity attributable to the
           dimasukkan pada ekuitas yang dapat                               Company’s equity holders.
           diatribusikan    kepada      pemilik     ekuitas
           Perusahaan.

     z.    Laba per saham                                          z.       Earnings per share

           Laba per saham dasar dihitung dengan                             Basic earnings per share is calculated by
           membagi laba periode berjalan yang                               dividing the profit for the period attributable to
           diatribusikan kepada pemegang saham                              the equity holders of the Company by the
           Perusahaan      dengan  jumlah   rata-rata                       weighted-average number of ordinary shares
           tertimbang saham biasa yang beredar pada                         outstanding during the period.
           periode berjalan.

           Laba per saham dilusian dihitung dengan                          Diluted earnings per share is calculated by
           membagi laba periode berjalan yang                               dividing profit for the period attributable to the
           diatribusikan kepada pemegang modal                              equity holders of the Company adjusted for
           Perusahaan yang telah disesuaikan dengan                         finance costs and foreign exchange gains or
           biaya keuangan dan keuntungan atau                               losses on convertible bonds and their related
           kerugian selisih kurs atas utang obligasi                        tax effects, by the weighted-average number
           konversi, serta pengaruh pajak yang                              of issued and fully paid-up shares during the
           bersangkutan, dengan jumlah tertimbang                           period/year, assuming that all options have
           saham yang ditempatkan dan disetor penuh                         been exercised and all convertible bonds have
           selama periode/tahun yang bersangkutan,                          been converted.
           berdasarkan asumsi bahwa semua opsi telah
           dilaksanakan dan seluruh utang obligasi
           konversi telah dikonversikan.

     aa.   Pembagian dividen                                       aa.      Dividend distributions

           Pembagian dividen kepada pemegang saham                          Dividend distributions to the Company’s
           Perusahaan diakui sebagai liabilitas dalam                       shareholders are recognised as liabilities in
           laporan keuangan konsolidasian interim                           the interim consolidated financial statements
           dalam periode ketika pembagian dividen telah                     in the period when the dividends are declared.
           diumumkan.

     ab.   Kombinasi bisnis entitas sepengendali                   ab.      Business combinations of entities under
                                                                            common control

           Kombinasi bisnis entitas sepengendali                            Business combinations of entities under
           dibukukan menggunakan metode penyatuan                           common control are accounted for using the
           kepemilikan (pooling-of-interests).                              pooling-of-interests method.

           Selisih antara harga konsiderasi yang diterima                   The difference between the consideration
           dengan nilai tercatat setiap transaksi                           received and the carrying amount of each
           restrukturisasi antara entitas sepengendali                      restructuring transaction among entities under
           dibukukan sebagai bagian tambahan modal                          common control is recorded as part of
           disetor dalam bagian ekuitas di laporan posisi                   additional paid-in capital in the equity section
           keuangan konsolidasian interim.                                  of the interim consolidated statements of
                                                                            financial position.
Page 62
                                      PT ADARO ENERGY INDONESIA Tbk
                                 DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                Lampiran 5/50 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                 30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                              (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                       unless otherwise stated)

2.   KEBIJAKAN AKUNTANSI MATERIAL (lanjutan)                     2.   MATERIAL ACCOUNTING POLICIES (continued)

     ac.   Pengakuan pendapatan dan beban                             ac.   Revenue and expense recognition

           Pendapatan dari kontrak dengan pelanggan                         Revenue from contracts with customers

           Pengakuan pendapatan harus memenuhi lima                         Revenue recognition has to fulfil five steps of
           langkah analisa sebagai berikut:                                 assessment:

           1.   Identifikasi kontrak dengan pelanggan.                      1.   Identify contract(s) with a customer.
           2.   Identifikasi kewajiban pelaksanaan dalam                    2.   Identify the performance obligations in the
                kontrak.       Kewajiban        pelaksanaan                      contract. Performance obligations are
                merupakan janji-janji dalam kontrak untuk                        promises in a contract to transfer to a
                menyerahkan barang atau jasa yang                                customer goods or services that are
                memiliki     karakteristik    berbeda      ke                    distinct.
                pelanggan.
           3.   Penetapan harga transaksi. Harga                            3.   Determine the transaction price. The
                transaksi merupakan jumlah imbalan                               transaction price is the amount of
                yang berhak diperoleh suatu entitas                              consideration to which an entity expects
                sebagai kompensasi atas diserahkannya                            to be entitled in exchange for transferring
                barang atau jasa yang dijanjikan ke                              promised goods or services to a
                pelanggan. Jika imbalan yang dijanjikan                          customer. If the consideration promised in
                di kontrak mengandung suatu jumlah                               a contract includes a variable amount, the
                yang bersifat variabel, maka Grup                                Group estimates the amount of
                membuat estimasi jumlah imbalan                                  consideration to which it expects to be
                tersebut sebesar jumlah yang diharapkan                          entitled in exchange for transferring the
                berhak diterima atas diserahkannya                               promised goods or services to a customer
                barang atau jasa yang dijanjikan ke                              less the estimated amount of service level
                pelanggan dikurangi dengan estimasi                              guarantee that will be paid during the
                jumlah jaminan kinerja jasa yang akan                            contract period.
                dibayarkan selama periode kontrak.
           4.   Alokasi harga transaksi ke setiap                           4.   Allocate the transaction price to each
                kewajiban         pelaksanaan        dengan                      performance obligation on the basis of the
                menggunakan dasar harga jual berdiri                             relative stand-alone selling prices of each
                sendiri relatif dari setiap barang atau jasa                     distinct item of goods or services
                berbeda yang dijanjikan di kontrak. Ketika                       promised in the contract. Where these are
                tidak dapat diamati secara langsung,                             not directly observable, the relative stand-
                harga     jual     berdiri   sendiri   relatif                   alone selling prices are estimated based
                diperkirakan berdasarkan biaya yang                              on expected cost plus margin.
                diharapkan ditambah marjin.
           5.   Pengakuan pendapatan ketika kewajiban                       5.   Recognise       revenue     when      the
                pelaksanaan telah dipenuhi dengan                                performance obligation is satisfied by
                menyerahkan barang atau jasa yang                                transferring the promised goods or
                dijanjikan      ke     pelanggan      (ketika                    services to a customer (which is when the
                pelanggan telah memiliki kendali atas                            customer obtains control of those goods
                barang atau jasa tersebut).                                      or services).
Page 63
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                             Lampiran 5/51 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                            30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                         (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                  unless otherwise stated)

2.   KEBIJAKAN AKUNTANSI MATERIAL (lanjutan)                2.   MATERIAL ACCOUNTING POLICIES (continued)

     ac.   Pengakuan      pendapatan      dan     beban          ac.   Revenue     and       expense      recognition
           (lanjutan)                                                  (continued)

           Pendapatan dari kontrak dengan pelanggan                    Revenue from contracts with customers
           (lanjutan)                                                  (continued)

           Pendapatan dari penjualan barang diakui                     Revenue from sales of goods is recognised
           ketika pengendalian dialihkan kepada                        when control transfers to the customer. There
           pelanggan. Terdapat kondisi di mana                         may be circumstances when judgement is
           pertimbangan diperlukan berdasarkan lima                    required based on the five indicators of control
           indikator pengendalian di bawah ini:                        below:

           1.   Pelanggan telah memiliki risiko dan                    1.   The customer has the significant risks and
                manfaat signifikan atas kepemilikan aset                    rewards of ownership and has the ability
                dan memperoleh kemampuan untuk                              to direct the use of, and obtain
                mengarahkan penggunaan atas, dan                            substantially all of the remaining benefits
                memperoleh secara substansial seluruh                       from, the goods.
                sisa manfaat dari barang.
           2.   Pelanggan memiliki kewajiban kini untuk                2.   The customer has a present obligation to
                membayar sesuai dengan syarat dan                           pay in accordance with the terms of the
                ketentuan dalam kontrak penjualan.                          sales contract.
           3.   Pelanggan telah menerima barang.                       3.   The customer has accepted the goods.
                Penjualan barang dapat tergantung pada                      Sales revenue may be subject to
                penyesuaian      berdasarkan     inspeksi                   adjustment based on the inspection of
                terhadap pengiriman oleh pelanggan.                         shipments by the customer. In these
                Dalam hal ini, penjualan diakui                             cases, sales are recognised based on the
                berdasarkan estimasi terbaik Grup                           Group’s best estimate of the grade and/or
                terhadap kualitas dan/atau kuantitas saat                   quantity at the time of shipment, and any
                pengiriman, dan penyesuaian kemudian                        subsequent adjustments are recorded
                dicatat dalam akun pendapatan. Secara                       against      revenue.   Historically, the
                historis, perbedaan antara kualitas dan                     differences between estimated and actual
                kuantitas, estimasi dan/atau aktual tidak                   grade and/or quantity have not been
                signifikan.                                                 significant.
           4.   Pelanggan telah memiliki hak kepemilikan               4.   The customer has the legal title to the
                legal atas barang.                                          goods.
           5.   Pelanggan telah menerima kepemilikan                   5.   The customer has physical possession of
                fisik atas barang.                                          the goods.

           Kewajiban pelaksanaan dapat          dipenuhi               A performance obligation may be satisfied at
           dengan cara sebagai berikut:                                the following:

           a.   Pada waktu tertentu (umumnya janji                     a.   Point in time (typically for promises to
                untuk   menyerahkan    barang  ke                           transfer goods to a customer); or
                pelanggan); atau

           b.   Sepanjang waktu (umumnya janji untuk                   b.   Over time (typically for promises to
                menyerahkan jasa ke pelanggan). Untuk                       transfer services to a customer). For a
                kewajiban pelaksanaan yang dipenuhi                         performance obligation satisfied over
                dalam suatu periode waktu, Grup memilih                     time, the Group selects an appropriate
                ukuran penyelesaian yang sesuai untuk                       measure of progress to determine the
                penentuan jumlah pendapatan yang                            amount of revenue that should be
                harus diakui karena telah terpenuhinya                      recognised as the performance obligation
                kewajiban pelaksanaan.                                      is satisfied.
Page 64
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                             Lampiran 5/52 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                            30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                         (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                  unless otherwise stated)

2.   KEBIJAKAN AKUNTANSI MATERIAL (lanjutan)                2.   MATERIAL ACCOUNTING POLICIES (continued)

     ac.   Pengakuan      pendapatan      dan     beban          ac.   Revenue     and       expense       recognition
           (lanjutan)                                                  (continued)

           Pendapatan dari kontrak dengan pelanggan                    Revenue from contracts with customers
           (lanjutan)                                                  (continued)

           Pembayaran harga transaksi berbeda untuk                    Payment of the transaction price is different
           setiap kontrak. Aset kontrak diakui setelah                 for each contract. A contract asset is
           imbalan yang dibayarkan oleh pelanggan                      recognised once the consideration paid by the
           kurang dari saldo kewajiban pelaksanaan                     customer is less than the balance of the
           yang telah dipenuhi. Liabilitas kontrak diakui              performance obligation that has been
           setelah imbalan yang dibayarkan oleh                        satisfied. A contract liability is recognised
           pelanggan lebih dari saldo kewajiban                        once the consideration paid by the customer
           pelaksanaan yang telah dipenuhi.                            is more than the balance of the performance
                                                                       obligation that has been satisfied.

           i.   Penjualan batubara                                     i.   Sales of coal

                Pendapatan penjualan diakui pada setiap                     Sales revenue is recognised on each
                penjualan individu ketika mengontrol                        individual sale when control transfers to
                transfer ke pelanggan. Kontrol beralih ke                   the customer. Control passes to the
                pelanggan dan pendapatan penjualan                          customer and sales revenue is
                diakui ketika produk dimuat ke kapal di                     recognised when the product is loaded
                mana batubara akan dikirim ke pelabuhan                     onto the vessel on which the coal will be
                tujuan atau tempat pelanggan.                               shipped to the destination port or the
                                                                            customer’s premises.

                Grup secara umum menjual batubara                           The Group generally sells its coal
                dengan syarat Free on Board (“FOB”), di                     products on Free on Board (“FOB”) terms,
                mana Grup tidak memiliki tanggung jawab                     where the Group has no responsibility for
                untuk pengangkutan atau asuransi                            freight or insurance once control of the
                setelah kontrol barang telah berlalu di                     goods has passed at the loading port.
                pelabuhan muat. Untuk jangka waktu ini                      Under these terms, there is only one
                hanya ada satu kewajiban kinerja, yaitu                     performance obligation, for the provision
                untuk penyediaan produk pada titik di                       of product at the point where control
                mana kontrol lewat. Selain itu juga, Grup                   passes. In addition, the Group also sells
                menjual batubara dengan syarat Cost,                        coal on Cost, Insurance and Freight
                Insurance and Freight (“CIF”), tetapi                       (“CIF”) terms, but under the sales
                berdasarkan      perjanjian    penjualan,                   agreement, the title and risk of loss of coal
                kepemilikan dan risiko kerugian atas                        shall remain with the Group until the coal
                batubara akan tetap berada pada Grup                        passes the discharging port. Under this
                sampai batubara melewati pelabuhan                          condition, the Group considers that the
                bongkar. Dalam kondisi ini, Grup                            insurance and freight costs are not
                menganggap bahwa biaya asuransi dan                         separate performance obligations but one
                pengangkutan        bukan     merupakan                     performance obligation with the sale of
                kewajiban kinerja terpisah melainkan satu                   coal as the control over the coal only
                kesatuan dengan kewajiban kinerja                           passes to the buyer when the coal has
                dengan penjualan batubara dikarenakan                       arrived    at   the    buyer’s      location.
                kontrol   atas    persediaan     batubara                   Accordingly, the Group does not have any
                berpindah ke pembeli pada saat batubara                     separate performance obligations for the
                tersebut sudah sampai di lokasi pembeli.                    transportation and insurance services
                Oleh karena itu Grup tidak memiliki                         provided.
                kewajiban kinerja terpisah untuk jasa
                pengangkutan dan asuransi yang
                disediakan.
Page 65
                                      PT ADARO ENERGY INDONESIA Tbk
                                 DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                 Lampiran 5/53 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                   FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                               30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                            (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                     unless otherwise stated)

2.   KEBIJAKAN AKUNTANSI MATERIAL (lanjutan)                  2.   MATERIAL ACCOUNTING POLICIES (continued)

     ac.   Pengakuan        pendapatan      dan      beban         ac.    Revenue     and         expense      recognition
           (lanjutan)                                                     (continued)

           Pendapatan dari kontrak dengan pelanggan                       Revenue from contracts with customers
           (lanjutan)                                                     (continued)

           ii.    Pendapatan jasa penambangan dan                         ii.    Rendering of mining and logistics
                  logistik, termasuk jasa sewa dan jasa                          services, including rental and other
                  lainnya                                                        services

                  Grup mengakui pendapatan          atas                         The Group recognises revenue for a
                  kewajiban pelaksanaan telah dipenuhi                           performance obligation satisfied over
                  dalam suatu periode waktu hanya jika                           time only if the Group can reasonably
                  Grup dapat mengukur dengan andal atas                          measure its progress towards complete
                  penyelesaian kewajiban pelaksanaan.                            satisfaction    of   the   performance
                  Dalam keadaan tertentu, Grup mungkin                           obligation. In some circumstances, the
                  tidak dapat mengukur hasil atas                                Group may not be able to reasonably
                  kewajiban pelaksanaan secara wajar,                            measure the outcome of a performance
                  tetapi   Grup    berekspektasi   untuk                         obligation, but the Group expects to
                  memulihkan biaya yang timbul dalam                             recover the costs incurred in satisfying
                  memenuhi     kewajiban    pelaksanaan.                         the performance obligation. In those
                  Dalam keadaan tersebut, Grup mengakui                          circumstances, the Group recognises
                  pendapatan hanya sebatas biaya yang                            revenue only to the extent of the costs
                  timbul sampai saat yang dapat mengukur                         incurred until such time that it can
                  hasil kewajiban pelaksanaan secara                             reasonably measure the outcome of the
                  wajar.                                                         performance obligation.

                  Pendapatan dari jasa pertambangan dan                          Revenue from mining and logistics
                  logistik, termasuk jawa sewa dan jasa                          services, including rental and other
                  lainnya, diakui atas dasar pekerjaan yang                      services, is recognised on the basis of the
                  diselesaikan dalam suatu waktu pada                            work completed over time as the services
                  saat jasa tersebut diberikan kepada                            are delivered to the customer.
                  pelanggan.

           iii.   Pendapatan penjualan listrik                            iii.   Sales of electricity

                  Pendapatan      yang    dihasilkan   dari                      Revenue generated from sales of
                  penjualan listrik diakui ketika keluaran                       electricity is recognised when the
                  listrik telah dikirimkan ke pelanggan.                         electrical output is delivered to the
                                                                                 customers.

           iv.    Komponen pembiayaan                                     iv. Financing component

                  Pendapatan keuangan dari pengaturan                            Finance income from service concession
                  jasa konsesi merupakan pendapatan                              arrangements represents the interest
                  bunga dari piutang jasa konsesi yang                           income on the service concession
                  timbul dari pengaturan jasa konsesi dan                        receivable arising from a service
                  diakui dengan menggunakan metode                               concession    arrangement     and    is
                  suku bunga efektif.                                            recognised using the effective interest
                                                                                 method.

                  Grup tidak memperkirakan adanya                                The Group does not expect to have any
                  kontrak di mana jangka waktu antara                            contracts where the period between the
                  pengalihan barang atau jasa yang                               transfer of the promised goods or
                  dijanjikan   kepada   pelanggan    dan                         services to the customer and payment by
                  pembayaran oleh pelanggan melebihi                             the customer exceeds one year, other
                  satu tahun selain penghasilan keuangan                         than finance income from service
                  yang timbul atas piutang jasa konsesi.                         concession      arrangements.      As    a
                  Akibatnya, Grup tidak menyesuaikan                             consequence, the Group does not adjust
                  harga transaksi apa pun terkait dengan                         any of the transaction prices for the time
                  nilai waktu uang.                                              value of money.
Page 66
                                     PT ADARO ENERGY INDONESIA Tbk
                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/54 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                   FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                               30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                            (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                     unless otherwise stated)

2.   KEBIJAKAN AKUNTANSI MATERIAL (lanjutan)                  2.   MATERIAL ACCOUNTING POLICIES (continued)

     ac.   Pengakuan        pendapatan      dan     beban          ac.   Revenue     and        expense        recognition
           (lanjutan)                                                    (continued)

           Beban                                                         Expenses

           i.    Beban dari kontrak dengan pelanggan                     i.    Expenses from contracts with customers

                 Biaya      yang      secara     langsung                      The costs that directly relate to the
                 berhubungan         dengan        kontrak,                    contract generate resources to satisfy the
                 menghasilkan sumber daya untuk                                contract (“cost to fulfil”) or are incremental
                 memenuhi      kontrak    (“biaya    untuk                     to obtaining a contract (“cost to obtain”)
                 memenuhi”) atau penambahan untuk                              and are expected to be recovered. These
                 mendapatkan kontrak (“biaya untuk                             costs    are     therefore       eligible  for
                 memperoleh”) dan diharapkan dapat                             capitalisation under SFAS No. 72 and
                 dipulihkan. Beban tersebut dengan                             recognised as assets. Such costs will be
                 demikian memenuhi syarat kapitalisasi                         amortised on a systematic basis that is
                 berdasarkan PSAK No. 72 dan diakui                            consistent with the transfer of the goods
                 sebagai      aset.    Beban      tersebut                     or services to which an asset relates.
                 diamortisasi dengan cara sistematis
                 sejalan dengan penyerahan barang atau
                 jasa yang terkait dengan aset tersebut.

           ii.   Beban-beban lainnya                                     ii.   Other expenses

                 Beban-beban lainnya diakui pada saat                          Other expenses are recognised when
                 terjadinya.                                                   they are incurred.

     ad.   Penghasilan keuangan                                    ad.   Finance income

           Penghasilan     keuangan     diakui   dengan                  Finance income is recognised using the
           menggunakan metode suku bunga efektif.                        effective interest method. When a loan or
           Ketika pinjaman atau piutang mengalami                        receivable is impaired, the Group reduces the
           penurunan nilai, Grup mengurangi nilai                        carrying amount to its recoverable amount,
           tercatat pinjaman dan piutang tersebut                        being the estimated future cash flows
           menjadi jumlah terpulihkannya, yakni estimasi                 discounted at the original effective interest rate
           arus kas masa depan yang didiskontokan                        of the instrument, and continues to unwind the
           berdasarkan suku bunga efektif awal dari                      discount as finance income. Finance income
           instrumen tersebut, dan terus mengamortisasi                  on impaired loans and receivables is
           diskonto sebagai penghasilan keuangan.                        recognised using the original effective interest
           Penghasilan keuangan atas pinjaman yang                       rate.
           diberikan dan piutang yang mengalami
           penurunan nilai diakui menggunakan suku
           bunga efektif awal.

     ae.   Pajak penghasilan kini dan tangguhan                    ae.   Current and deferred income tax

           Beban pajak terdiri dari pajak kini dan pajak                 Tax expense comprises current and deferred
           tangguhan. Pajak diakui dalam laba rugi,                      tax. Tax is recognised in profit or loss, except
           kecuali jika pajak itu terkait dengan kejadian                to the extent that it relates to items recognised
           atau transaksi yang diakui di penghasilan                     in other comprehensive income or directly in
           komprehensif lain atau langsung diakui ke                     equity. In this case, the tax expense is
           ekuitas. Dalam hal ini, beban pajak tersebut                  recognised in other comprehensive income or
           masing-masing diakui pada penghasilan                         directly in equity, respectively.
           komprehensif lain atau secara langsung
           dicatat ke ekuitas.
Page 67
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                             Lampiran 5/55 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                            30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                         (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                  unless otherwise stated)

2.   KEBIJAKAN AKUNTANSI MATERIAL (lanjutan)                2.   MATERIAL ACCOUNTING POLICIES (continued)

     ae.   Pajak penghasilan kini dan tangguhan                  ae.   Current and         deferred     income      tax
           (lanjutan)                                                  (continued)

           Beban pajak kini dihitung berdasarkan                       The current income tax charge is calculated
           peraturan perpajakan yang berlaku pada                      on the basis of the tax laws enacted as at the
           tanggal pelaporan keuangan, di negara                       reporting date in the countries where the
           dimana Perusahaan dan entitas anaknya                       Company and its subsidiaries operate and
           beroperasi dan menghasilkan penghasilan                     generate taxable income. Specifically for AI,
           kena pajak. Khusus untuk AI, tarif pajak yang               the tax rate used up to 31 December 2022 was
           digunakan sampai dengan tanggal 31                          45%, as stipulated in the CCA which was
           Desember 2022 adalah 45%, sesuai dengan                     effective until the end of the 2022 fiscal year
           PKP2B yang mana berlaku efektif sampai                      as stipulated in the IUPK for the Continuation
           dengan akhir periode fiskal 2022 yang                       of Contract/Agreement Operation (Note 3).
           tertuang dalam IUPK sebagai Kelanjutan                      Starting 1 January 2023, the current income
           Operasi Kontrak/Perjanjian (Catatan 3). Sejak               tax charge of AI is calculated on the basis of
           tanggal 1 Januari 2023, beban pajak                         the tax laws enacted as at the reporting date.
           penghasilan kini AI akan dihitung berdasarkan               Management periodically evaluates the
           peraturan perpajakan yang berlaku pada                      positions taken in Annual Tax Returns with
           tanggal pelaporan. Manajemen secara                         respect to situations in which the applicable
           periodik mengevaluasi posisi yang diambil                   tax regulations are subject to interpretation. It
           dalam Surat       Pemberitahuan Tahunan                     establishes a provision where appropriate on
           sehubungan dengan situasi dimana aturan                     the basis of the amounts expected to be paid
           pajak yang berlaku membutuhkan interpretasi                 to the tax authorities.
           atas peraturan pajak yang berlaku. Jika perlu,
           manajemen menentukan provisi dibentuk
           berdasarkan jumlah yang diharapkan akan
           dibayar pada otoritas pajak.

           Untuk penghasilan yang menjadi subjek pajak                 For income that is subject to final tax, tax
           penghasilan final, beban pajak diakui secara                expenses are recognised proportionally with
           proporsional dengan jumlah pendapatan                       the accounting revenue recognised and
           akuntansi yang diakui dan disajikan sebagai                 presented as part of the operating expenses
           bagian dari beban operasional pada periode                  in the current year, as this tax does not satisfy
           berjalan dikarenakan pajak tersebut tidak                   the criteria of income tax.
           memenuhi kriteria sebagai pajak penghasilan.

           Pajak penghasilan tangguhan diakui, dengan                  Deferred income tax is recognised, using the
           menggunakan metode liabilitas untuk semua                   liability method, on temporary differences
           perbedaan temporer antara dasar pengenaan                   arising between the tax bases of assets and
           pajak aset dan liabilitas dengan nilai                      liabilities and their carrying amounts in the
           tercatatnya     pada    laporan     keuangan                interim consolidated financial statements.
           konsolidasian interim. Namun, liabilitas pajak              However, deferred tax liabilities are not
           tangguhan tidak diakui jika timbul dari                     recognised if they arise from the initial
           pengakuan awal goodwill; dan pada saat                      recognition of goodwill; and deferred income
           pengakuan awal suatu aset atau liabilitas yang              tax is not accounted for if it arises from the
           timbul dari transaksi selain kombinasi bisnis               initial recognition of an asset or liability in a
           yang pada saat transaksi tersebut tidak                     transaction other than a business combination
           mempengaruhi laba rugi akuntansi maupun                     that at the time of the transaction affects
           laba rugi pajak dan tidak menimbulkan                       neither accounting nor taxable profit or loss
           perbedaan temporer kena pajak dan                           and does not give rise to equal taxable and
           perbedaan temporer dapat dikurangi dalam                    deductible temporary differences. Deferred
           jumlah yang sama. Pajak penghasilan                         income tax is determined using the tax rates
           tangguhan ditentukan menggunakan tarif                      that have been enacted or substantively
           pajak yang berlaku atau yang secara                         enacted at the end of the reporting period/year
           substansial telah berlaku pada akhir                        and are expected to apply when the related
           periode/tahun pelaporan dan diharapkan                      deferred income tax asset is realised or the
           diterapkan jika aset pajak penghasilan                      deferred income tax liability is settled.
           tangguhan direalisasikan atau liabilitas pajak
           tangguhan diselesaikan.
Page 68
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                            Lampiran 5/56 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                           NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                 FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                             30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                          (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                   unless otherwise stated)

2.   KEBIJAKAN AKUNTANSI MATERIAL (lanjutan)                2.   MATERIAL ACCOUNTING POLICIES (continued)

     ae.   Pajak penghasilan kini dan tangguhan                  ae.   Current     and     deferred      income      tax
           (lanjutan)                                                  (continued)

           Aset pajak penghasilan tangguhan diakui                     Deferred income tax assets are recognised
           hanya jika besar kemungkinan jumlah                         only to the extent that it is probable that future
           penghasilan kena pajak di masa depan akan                   taxable profits will be available against which
           memadai untuk dikompensasi dengan                           the temporary differences can be utilised.
           perbedaan temporer yang masih dapat
           digunakan.

           Liabilitas dan aset pajak tangguhan tidak                   Deferred tax liabilities and assets are not
           diakui untuk perbedaan temporer antara nilai                recognised for temporary differences between
           tercatat dan dasar pengenaan pajak atas                     the carrying amount and tax bases of
           investasi dalam ventura bersama dimana                      investments in joint ventures where the Group
           Grup dapat mengendalikan waktu pembalikan                   is able to control the timing of the reversal of
           perbedaan temporer dan kemungkinan besar                    the temporary differences and it is probable
           perbedaan tersebut tidak akan dibalik di masa               that the differences will not be reversed in the
           mendatang.                                                  foreseeable future.

           Aset dan liabilitas pajak penghasilan                       Deferred income tax assets and liabilities are
           tangguhan dapat saling hapus jika terdapat                  offset when there is a legally enforceable right
           hak yang berkekuatan secara hukum untuk                     to offset current tax assets against current tax
           melakukan saling hapus antara aset pajak kini               liabilities.
           dengan liabilitas pajak kini.

           Selain pajak penghasilan, Grup juga mengakui                In addition to income tax, the Group also
           bentuk pembayaran lain ke Pemerintah yang                   recognises other types of payments to the
           dihitung     berdasarkan     produksi     atau              Government that are calculated based on
           pendapatan (royalti). Iuran eksploitasi dan                 production or revenue (i.e. royalty fees).
           royalti dianggap sebagai pajak penghasilan                  Exploitation fees and royalty fees are
           apabila mereka memiliki karakteristik sebagai               accounted for as income taxes when they
           pajak penghasilan. Hal ini dipertimbangkan                  have the characteristics of an income tax. This
           demikian     apabila   dipersyaratkan     oleh              is considered to be the case when the tax is
           Pemerintah dan jumlah terutang didasarkan                   imposed by the Government and the amount
           pada penghasilan kena pajak daripada                        payable is based on taxable income rather
           kuantitas fisik yang diproduksi atau                        than on physical quantities produced or a
           persentase dari penjualan. Untuk perjanjian                 percentage      of    revenue.     For      such
           yang demikian, pajak penghasilan dan pajak                  arrangements, current and deferred income
           penghasilan ditangguhkan akan dicatat sesuai                tax is provided on the same basis as described
           dengan penjelasan di atas untuk bentuk lain                 above for other forms of taxation. The
           perpajakan. Kewajiban Grup yang timbul dari                 obligations of the Group arising from
           ketentuan iuran eksploitasi atau royalti dalam              exploitation fees or royalty arrangements
           PKP2B atau IUPK sebagai Kelanjutan Operasi                  under AI’s CCA or IUPK for the Continuation
           Kontrak/Perjanjian AI atau PKP2B entitas-                   of Contract/Agreement Operation or the AMC
           entitas AMC, PC dan RC atau Izin Usaha                      entities, PC and RC’s CCoWs or the IUPs of
           Pertambangan entitas pertambangan lain di                   other mining entities in the Group do not
           dalam Grup tidak memenuhi kriteria sebagai                  satisfy these criteria, therefore, they are
           pajak penghasilan, sehingga diakui sebagai                  recognised as current provisions and included
           provisi dan dicatat sebagai beban pokok                     in cost of revenue. The obligations arising from
           pendapatan. Kewajiban yang timbul dari                      exploitation fees or royalty arrangements
           ketentuan iuran eksploitasi atau royalti dalam              under AI’s CCA were still applicable until the
           PKP2B AI masih berlaku hingga akhir tahun                   end of the 2022 fiscal year (Note 1c).
           fiskal 2022 (Catatan 1c).

     af.   Laporan segmen                                        af.   Segment reporting

           Segmen operasi dilaporkan dengan cara yang                  Operating segments are reported in a manner
           konsisten dengan pelaporan internal yang                    consistent with the internal reporting provided
           diberikan kepada pengambil keputusan                        to the chief operating decision-maker. The
           operasional. Direksi merupakan pengambil                    chief operating decision-maker, who is
           keputusan operasional yang bertanggung                      responsible for allocating resources and
           jawab untuk mengalokasikan sumber daya                      assessing the performance of the operating
           dan menilai kinerja segmen operasi dan                      segments and making strategic decisions, has
           membuat keputusan strategis.                                been identified as the Board of Directors.
Page 69
                                     PT ADARO ENERGY INDONESIA Tbk
                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/57 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                 30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                              (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                       unless otherwise stated)

3.   ESTIMASI DAN PERTIMBANGAN AKUNTANSI                      3.   CRITICAL ACCOUNTING              ESTIMATES       AND
     YANG PENTING                                                  JUDGEMENTS

     Penyusunan laporan keuangan konsolidasian                     The preparation of interim consolidated financial
     interim yang sesuai dengan Standar Akuntansi                  statements in conformity with Indonesian Financial
     Keuangan di Indonesia mengharuskan manajemen                  Accounting Standards requires management to
     untuk membuat estimasi dan asumsi yang                        make estimates and assumptions that affect the
     mempengaruhi jumlah aset dan liabilitas yang                  reported amounts of assets and liabilities and the
     dilaporkan dan pengungkapan aset dan liabilitas               disclosure of contingent assets and liabilities at the
     kontinjensi pada tanggal pelaporan, serta jumlah              reporting date and the reported amounts of revenue
     pendapatan dan beban selama periode pelaporan.                and expenses during the reporting period. Estimates,
     Estimasi, asumsi, dan pertimbangan tersebut                   assumptions and judgements are continually
     dievaluasi secara terus menerus dan berdasarkan               evaluated and are based on historical experience
     pengalaman historis dan faktor-faktor lainnya,                and other factors, including expectations of future
     termasuk harapan peristiwa di masa datang yang                events that are believed to be reasonable under the
     diyakini wajar berdasarkan kondisi yang ada.                  circumstances.

     Grup telah mengidentifikasi hal-hal berikut dimana            The Group has identified the following matters under
     diperlukan pertimbangan, estimasi dan asumsi                  which significant judgements, estimates and
     signifikan dan dimana hasil aktual dapat berbeda dari         assumptions are made and where actual results may
     estimasi tersebut jika menggunakan asumsi dan                 differ from these estimates under different
     kondisi yang berbeda dan dapat mempengaruhi                   assumptions and conditions and may materially
     secara material hasil keuangan atau posisi keuangan           affect the interim consolidated financial results or
     konsolidasian interim Grup yang dilaporkan dalam              financial position of the Group reported in future
     periode mendatang.                                            periods.

     -   Provisi atas kerugian kredit ekspektasian aset            -     Provision for ECL of financial assets
         keuangan

         Grup menggunakan matriks provisi untuk                          The Group uses a provision matrix to calculate
         menghitung kerugian kredit ekspektasian piutang                 ECL for trade receivables. The provision rates
         usaha. Tingkat provisi adalah berdasarkan hari                  are based on days past due for groupings of
         jatuh tempo atas kelompok segmen pelanggan                      various customer segments that have similar
         yang mempunyai karakteristik risiko kredit yang                 credit risk characteristics (e.g., by geography,
         serupa (misalnya berdasarkan geografi, tipe                     product type, customer type and/or rating, and
         produk, tipe dan/atau peringkat pelanggan, dan                  coverage by letters of credit and other forms).
         nilai pertanggungan dari letter of credit dan
         bentuk lain).

         Matriks provisi pada mulanya didasarkan pada                    The provision matrix is initially based on the
         tingkat gagal bayar historis Grup yang                          Group’s historical observed default rates. The
         diobservasi. Grup akan memperbaharui matriks                    Group will calibrate the matrix to adjust the
         untuk menyesuaikan pengalaman kerugian kredit                   historical credit loss experience with forward-
         historis dengan informasi forward-looking.                      looking information. For instance, if forecast
         Sebagai contoh, jika perkiraan atas kondisi                     economic conditions are expected to deteriorate
         ekonomi diperkirakan memburuk selama periode                    over the next period, which can lead to an
         depan, yang dapat menyebabkan meningkatnya                      increased number of defaults, the historical
         jumlah gagal bayar, tingkat gagal bayar historis                default rates are adjusted. At every reporting
         disesuaikan. Pada setiap tanggal pelaporan,                     date, the historically observed default rates are
         tingkat gagal bayar historis diperbaharui dan                   updated and changes in the forward-looking
         perubahan estimasi forward-looking dianalisis.                  estimates are analysed.

         Penilaian atas korelasi antara tingkat gagal bayar              The assessment of the correlation between
         historis yang diobservasi, perkiraan atas kondisi               historically observed default rates, forecast
         ekonomi dan kerugian kredit ekspektasian                        economic conditions and ECL is a significant
         merupakan estimasi yang signifikan. Jumlah                      estimate. The amount of ECL is sensitive to
         kerugian kredit ekspektasian paling dipengaruhi                 changes in circumstances and forecast
         oleh perubahan keadaan dan perkiraan kondisi                    economic conditions. The Group’s historical
         ekonomi. Pengalaman kerugian kredit historis                    credit loss experience and forecast of economic
         Grup dan perkiraan kondisi ekonomi juga                         conditions may also not be representative of a
         mungkin tidak menggambarkan gagal bayar                         customer’s actual default in the future.
         aktual pelanggan di masa yang akan datang.
Page 70
                                     PT ADARO ENERGY INDONESIA Tbk
                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/58 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                 30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                              (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                       unless otherwise stated)

3.   ESTIMASI DAN PERTIMBANGAN AKUNTANSI                      3.   CRITICAL ACCOUNTING                ESTIMATES        AND
     YANG PENTING (lanjutan)                                       JUDGEMENTS (continued)

     -   Provisi atas kerugian kredit ekspektasian aset            -     Provision for ECL of financial assets (continued)
         keuangan (lanjutan)

         Selain provisi penurunan nilai kolektif, Grup juga              In addition to a collective impairment provision,
         menerapkan provisi khusus untuk aset                            the Group also implements specific provisions
         keuangan selain piutang. Tingkat provisi tertentu               for financial assets other than receivables. The
         dievaluasi oleh manajemen berdasarkan faktor-                   level of a specific provision is evaluated by
         faktor yang mempengaruhi kolektibilitas piutang.                management on the basis of factors that affect
         Dalam kasus ini, Grup menggunakan penilaian                     the collectability of the accounts. In these cases,
         berdasarkan fakta dan keadaan terbaik yang                      the Group uses judgement based on the best
         tersedia, termasuk namun tidak terbatas pada,                   available facts and circumstances, including but
         lamanya hubungan Grup dengan pelanggan dan                      not limited to, the length of the Group’s
         status kredit pelanggan berdasarkan laporan                     relationship with the customers and customers’
         kredit pihak ketiga dan faktor pasar yang                       credit status based on third-party credit reports
         diketahui, untuk mencatat cadangan khusus                       and known market factors, to record specific
         untuk pelanggan terhadap jumlah yang jatuh                      reserves for customers against amounts due in
         tempo dalam jumlah yang diharapkan untuk                        amounts that it expects to collect. These specific
         dikumpulkan. Cadangan spesifik ini dievaluasi                   reserves are re-evaluated and adjusted as
         kembali dan disesuaikan karena informasi                        additional information received affects the
         tambahan yang diterima mempengaruhi jumlah                      amounts estimated.
         yang diestimasi.

     -   Sewa                                                      -     Leases

         Penentuan       apakah     suatu     perjanjian                 Determining whether an arrangement is or
         mengandung       unsur   sewa    membutuhkan                    contains a lease requires careful judgement to
         pertimbangan yang cermat untuk menilai apakah                   assess whether the arrangement conveys a right
         perjanjian tersebut memberikan hak untuk                        to obtain substantially all the economic benefits
         mendapatkan secara substansial seluruh                          from use of the asset throughout the period of
         manfaat ekonomis dari penggunaan aset                           the use and the right to direct the use of the
         identifikasian dan hak untuk mengarahkan                        asset, even if the right is not explicitly specified
         penggunaan aset identifikasian, bahkan jika hak                 in the arrangement.
         tersebut tidak dijabarkan secara eksplisit di
         perjanjian.

         Karena Grup tidak dapat dengan mudah                            Since the Group could not readily determine the
         menentukan suku bunga implisit, manajemen                       implicit rate, management uses the Group’s
         menggunakan suku bunga pinjaman inkremental                     incremental borrowing rate as a discount rate.
         Grup sebagai tingkat diskonto. Ada beberapa                     There are a number of factors to consider in
         faktor yang perlu dipertimbangkan dalam                         determining an incremental borrowing rate,
         menentukan suku bunga pinjaman inkremental,                     many of which need judgement in order to be
         yang banyak di antaranya memerlukan                             able to reliably quantify any necessary
         pertimbangan untuk dapat secara andal                           adjustments to arrive at the final discount rates.
         mengukur penyesuaian yang diperlukan untuk
         sampai pada tingkat diskonto akhir.

         Dalam menentukan suku bunga pinjaman                            In determining the incremental borrowing rate,
         inkremental, Grup mempertimbangkan faktor-                      the Group considers the following main factors:
         faktor utama berikut: risiko kredit korporat Grup,              the Group’s corporate credit risk, the lease term,
         jangka waktu sewa, jangka waktu pembayaran                      the lease payment term, the economic
         sewa, lingkungan ekonomi, waktu di mana sewa                    environment, the time at which the lease is
         dimasukkan, dan mata uang di mana                               entered into, and the currency in which the
         pembayaran sewa ditentukan.                                     lease payments are denominated.

         Dalam menentukan jangka waktu sewa, Grup                        In determining the lease term, management
         mempertimbangkan semua fakta dan keadaan                        considers all facts and circumstances that
         yang menimbulkan insentif ekonomi untuk                         create an economic incentive to exercise an
         menggunakan opsi perpanjangan, atau tidak                       extension option, or not exercise a termination
         menggunakan       opsi     penghentian.  Opsi                   option. Extension options (or periods after
         perpanjangan (atau periode setelah opsi                         termination options) are only included in the
         penghentian kontrak kerja) hanya termasuk                       lease term if the lease is reasonably certain to
         dalam jangka waktu sewa jika cukup pasti akan                   be extended (or not terminated).
         diperpanjang (atau tidak dihentikan).
Page 71
                                   PT ADARO ENERGY INDONESIA Tbk
                              DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                               Lampiran 5/59 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                   FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                               30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                            (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                     unless otherwise stated)

3.   ESTIMASI DAN PERTIMBANGAN AKUNTANSI                   3.    CRITICAL ACCOUNTING                 ESTIMATES       AND
     YANG PENTING (lanjutan)                                     JUDGEMENTS (continued)

     -   Sewa (lanjutan)                                         -      Leases (continued)

         Untuk sewa bangunan dan peralatan, berikut                     For leases of buildings and equipment, the
         merupakan faktor-faktor yang pada umumnya                      following factors are normally the most relevant:
         paling relevan:

            Jika terdapat penalti yang signifikan untuk                   If there are significant penalties to terminate
             mengakhiri (atau tidak memperpanjang),                         (or not extend), the Group is typically
             Grup     biasanya    cukup    pasti   untuk                    reasonably certain to extend (or not
             memperpanjang (atau tidak mengakhiri).                         terminate).
            Jika prasarana diperkirakan mempunyai nilai                   If any leasehold improvements are expected
             sisa yang signifikan, Grup biasanya cukup                      to have a significant remaining value, the
             pasti untuk memperpanjang (atau tidak                          Group is typically reasonably certain to
             mengakhiri).                                                   extend (or not terminate).
            Jika tidak, Grup mempertimbangkan faktor                      Otherwise, the Group considers other factors
             lain termasuk jangka waktu sewa historis                       including historical lease durations and the
             dan biaya dan gangguan bisnis yang timbul                      costs and business disruption required to
             untuk menggantikan aset sewa tersebut.                         replace the leased asset.

     -   Pajak penghasilan dan pajak lainnya                     -      Income taxes and other taxes

         Perhitungan beban pajak penghasilan masing-                    The calculation of income tax expense for each
         masing perusahaan dalam Grup memerlukan                        company within the Group requires judgements
         pertimbangan dan asumsi dalam menentukan                       and assumptions in determining the capital
         penyisihan modal dan pengurangan beban                         allowances and deductibility of certain expenses
         tertentu selama proses pengestimasian. Secara                  during the estimation process. In particular, the
         khusus, perhitungan beban pajak penghasilan                    calculation of income tax expense for entities
         entitas di dalam Grup yang beroperasi dalam                    within the Group operating under a CCA or
         PKP2B melibatkan penafsiran terhadap Undang-                   CCoW involves the interpretation of applicable
         Undang dan peraturan perpajakan yang berlaku                   tax laws and regulations including the CCA or
         serta PKP2B. Berdasarkan IUPK sebagai                          CCoW. In accordance with AI’s IUPK for the
         Kelanjutan Operasi Kontrak/Perjanjian AI                       Continuation of Contract/Agreement Operation
         tertanggal 13 September 2022, ketentuan                        dated 13 September 2022, the provisions for
         perpajakan yang diatur dalam PKP2B AI masih                    taxation set forth in AI’s CCA were valid until the
         berlaku sampai dengan akhir tahun 2022.                        end of 2022.

         Penghasilan yang diperoleh perusahaan-                         The revenue of the entities within the Group is
         perusahaan dalam Grup kadang-kadang dapat                      sometimes also subject to both final and non-
         dikenakan pajak final dan non-final. Penentuan                 final income tax. Determining the amount of
         penghasilan yang dikenakan pajak final dan                     revenue subject to final and non-final tax as well
         non-final dan juga biaya pengurang pajak                       as expenses relating to revenue from the non-
         sehubungan     dengan      penghasilan    yang                 final income tax regime requires judgements
         dikenakan    pajak     non-final   memerlukan                  and estimates.
         pertimbangan dan estimasi.

         Semua pertimbangan dan estimasi yang dibuat                    All judgements and estimates made by
         manajemen seperti yang diungkapkan di atas                     management as discussed above may be
         dapat dipertanyakan oleh Direktorat Jenderal                   challenged by the Directorate General of
         Pajak (“DJP”). Sebagai akibatnya, terjadi                      Taxation (“DGT”). As a result, the ultimate tax
         ketidakpastian dalam penentuan kewajiban                       determination     becomes       uncertain.   The
         pajak. Resolusi posisi pajak yang diambil oleh                 resolution of tax positions taken by the Group
         Grup dapat berlangsung bertahun-tahun dan                      can take several years to complete and, in some
         sangat sulit untuk memprediksi hasil akhirnya.                 cases, it is difficult to predict the ultimate
         Apabila terdapat perbedaan perhitungan pajak                   outcome. Where the final outcome of these
         dengan jumlah yang telah dicatat, perbedaan                    matters is different from the amounts initially
         tersebut    akan   berdampak     pada    pajak                 recorded, such differences will have an impact
         penghasilan dan pajak tangguhan dalam tahun                    on the income tax and deferred income tax
         dimana penentuan pajak tersebut dibuat.                        provision in the year in which this determination
                                                                        is made.
Page 72
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                             Lampiran 5/60 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                             (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                      unless otherwise stated)

3.   ESTIMASI DAN PERTIMBANGAN AKUNTANSI                     3.   CRITICAL ACCOUNTING                ESTIMATES        AND
     YANG PENTING (lanjutan)                                      JUDGEMENTS (continued)

     -   Pajak penghasilan dan pajak lainnya (lanjutan)           -     Income taxes and other taxes (continued)

         Aset pajak tangguhan, termasuk yang timbul dari                Deferred tax assets, including those arising from
         rugi fiskal, dan perbedaan temporer lainnya,                   tax losses carried forward and temporary
         diakui hanya apabila dianggap lebih mungkin                    differences, are recognised only where it is
         daripada tidak bahwa mereka dapat diterima                     considered more likely than not that they will be
         kembali, dimana hal ini tergantung pada                        recovered, which depends on the generation of
         kecukupan pembentukan laba kena pajak di                       sufficient future taxable profits. Similar to
         masa depan. Sama seperti “penurunan nilai aset                 “impairment of non-financial assets” discussed
         non-keuangan” didiskusikan di bawah, asumsi                    below, assumptions about the generation of
         atas pembentukan laba kena pajak sangat                        future taxable profits are heavily affected by
         dipengaruhi oleh estimasi dan asumsi                           management’s estimates and assumptions
         manajemen atas tingkat produksi yang                           regarding the expected production levels, sales
         diharapkan, volume penjualan, harga komoditas,                 volumes, commodity prices, etc, which are
         dan lain-lain, yang mana terpapar risiko dan                   subject to risk and uncertainty, and hence there
         ketidakpastian, sehingga ada kemungkinan                       is a possibility that changes in circumstances will
         perubahan estimasi dan asumsi akan mengubah                    alter the projected future taxable profits.
         proyeksi laba kena pajak di masa mendatang.

     -   Provisi pembongkaran, rehabilitasi, reklamasi            -     Provision      for    decommissioning,        mine
         dan penutupan tambang                                          rehabilitation, reclamation and closure

         Seperti yang dijelaskan pada Catatan 40 atas                   As discussed in Note 40 to these interim
         laporan keuangan konsolidasian interim ini,                    consolidated financial statements, there are
         terdapat beberapa Peraturan Pemerintah dan                     several Government and Ministerial Regulations
         Kementerian       yang    mengatur    kewajiban                dealing with rehabilitation, reclamation and mine
         rehabilitasi, reklamasi, dan penutupan tambang                 closure obligations of mining companies
         untuk perusahaan tambang yang beroperasi di                    operating in Indonesia. Therefore, AI, JC, LC,
         Indonesia. Oleh karena itu, AI, JC, LC, MC,                    MC, SCM, LSA and MIP have calculated
         SCM, LSA, dan MIP menghitung provisi                           provisions for mine rehabilitation, reclamation
         rehabilitasi, reklamasi, dan penutupan tambang                 and closure based on these regulations.
         atas dasar peraturan-peraturan tersebut.

         Seperti yang dijelaskan pada Catatan 2t laporan                As discussed in Note 2t to these interim
         keuangan konsolidasian interim ini, reklamasi,                 consolidated financial statements, reclamation,
         rehabilitasi, dan biaya lingkungan yang berkaitan              rehabilitation and environmental expenditure to
         dengan pemulihan atas area terganggu selama                    be incurred related to the remediation of
         tahap produksi dibebankan pada beban pokok                     disturbed areas during the production phase are
         pendapatan pada saat kewajiban berkaitan                       charged to cost of revenue when the obligation
         dengan pemulihan tersebut timbul selama                        arising from the disturbance occurs as extraction
         proses     penambangan.        Reklamasi     area              progresses. The reclamation of disturbed areas
         terganggu dan pembongkaran aset tambang                        and decommissioning of mining assets and
         dan aset-aset berumur panjang lainnya akan                     other long-lived assets will be undertaken
         dilakukan selama beberapa tahun mendatang                      several years into the future and precise
         dan persyaratan atas reklamasi ini terus berubah               requirements are constantly changing to satisfy
         untuk memenuhi ekspektasi politik, lingkungan,                 political, environmental, safety and public
         keamanan, dan publik. Dengan demikian waktu                    expectations. As such, the timing and amounts
         pelaksanaan dan jumlah arus kas di masa                        of future cash flows required to settle the
         mendatang yang dibutuhkan untuk memenuhi                       obligations at each of the reporting dates are
         kewajiban pada setiap tanggal pelaporan                        subject to significant uncertainty. Changes in the
         dipengaruhi oleh ketidakpastian yang signifikan.               life of operation, estimated future costs, timing of
         Perubahan pada umur operasi, perkiraan biaya                   activities, discount rates, and inflation rates
         di masa mendatang, waktu kegiatan, tarif                       could have a material impact on the Group’s
         diskonto,      dan     tingkat    inflasi   dapat              interim consolidated financial statements.
         mempengaruhi         secara    material   laporan
         keuangan konsolidasian interim Grup.
Page 73
                                     PT ADARO ENERGY INDONESIA Tbk
                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/61 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                 30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                              (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                       unless otherwise stated)

3.   ESTIMASI DAN PERTIMBANGAN AKUNTANSI                      3.   CRITICAL ACCOUNTING               ESTIMATES       AND
     YANG PENTING (lanjutan)                                       JUDGEMENTS (continued)

     -   Estimasi cadangan                                         -     Reserve estimates

         Cadangan batubara adalah bagian yang dapat                      Coal reserves are the economically mineable
         ditambang secara ekonomis dari sumber daya                      part of coal resources that result in an estimated
         batubara yang menghasilkan perkiraan tonase                     tonnage and quality which, in the opinion of the
         dan kualitas yang, menurut pendapat orang yang                  competent person making the estimates, can be
         berkompeten yang membuat perkiraan, dapat                       the basis of a technically and economically
         menjadi dasar proyek yang layak secara teknis                   viable project, after taking account of material
         dan        ekonomis,       setelah     dengan                   relevant “Modifying Factors”.
         mempertimbangkan “Faktor Pengubah” yang
         relevan secara material.

         Faktor Pengubah adalah pertimbangan yang                        Modifying Factors are considerations used to
         digunakan untuk mengkonversi sumber daya                        convert coal resources to coal reserves. These
         batubara menjadi cadangan batubara. Ini                         include, but are not restricted to, mining factors
         termasuk, namun tidak terbatas pada, faktor                     (among others geological and technical factors
         pertambangan (antara lain faktor geologi dan                    including quantities and qualities, production
         teknis termasuk kuantitas dan kualitas, teknik                  techniques and stripping ratios based on deposit
         produksi dan nisbah kupas berdasarkan karakter                  character), processing factors, infrastructure
         deposit), faktor pengolahan, faktor infrastruktur,              factors, economic factors (among others
         faktor ekonomi (antara lain biaya produksi, biaya               production cost, transport cost, future capital
         transportasi, belanja modal masa depan,                         expenditure, mine closure obligations and
         kewajiban penutupan tambang dan nilai tukar),                   exchange rates), marketing factors (among
         faktor pemasaran (antara lain permintaan                        others commodity demand and commodity
         komoditas dan harga komoditas), faktor hukum,                   prices), legal, environmental, social and
         lingkungan, sosial dan pemerintah.                              governmental factors.

         Grup menentukan dan melaporkan cadangan                         The Group determines and reports its coal
         batubaranya berdasarkan prinsip yang terdapat                   reserves under the principles of the Australasian
         dalam Australasian Joint Ore Reserves                           Joint Ore Reserves Committee (the “JORC”)
         Committee untuk Pelaporan Hasil Eksplorasi,                     which is a member of the Committee for Mineral
         Sumber Daya Mineral dan Cadangan Bijih                          Reserves International Reporting Standards (the
         (“JORC”) yang merupakan anggota Komite                          “CRIRSCO”).
         untuk Standar Pelaporan Cadangan Mineral
         Internasional (“CRIRSCO”).

         Memperkirakan jumlah dan/atau nilai kalori                      Estimating the quantity and/or calorific value of
         cadangan batubara membutuhkan ukuran,                           coal reserves requires the size, shape and depth
         bentuk, dan kedalaman lapisan batubara atau                     of coal seams or fields to be determined by
         lapangan yang akan ditentukan dengan                            analysing geological data such as drilling
         menganalisis data geologi seperti “uji petik”                   samples. This process may require complex and
         (sampel) pengeboran. Proses ini mungkin                         difficult geological judgements to interpret the
         memerlukan pertimbangan geologi yang                            data.
         kompleks dan sulit untuk menginterpretasikan
         data.
Page 74
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                             Lampiran 5/62 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                   FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                               30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                            (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                     unless otherwise stated)

3.   ESTIMASI DAN PERTIMBANGAN AKUNTANSI                    3.   CRITICAL ACCOUNTING               ESTIMATES        AND
     YANG PENTING (lanjutan)                                     JUDGEMENTS (continued)

     -   Estimasi cadangan (lanjutan)                            -     Reserve estimates (continued)

         Karena asumsi ekonomi yang digunakan untuk                    Because the economic assumptions used to
         memperkirakan cadangan berubah dari tahun ke                  estimate reserves change from year to year and
         tahun dan karena data geologi tambahan yang                   because additional geological data is generated
         dihasilkan selama operasi, perkiraan cadangan                 during the course of operations, estimates of
         dapat berubah dari tahun ke tahun. Perubahan                  reserves may change from year to year.
         cadangan       yang     diestimasikan    dapat                Changes in estimated reserves may affect the
         mempengaruhi hasil dan posisi keuangan                        Group’s interim consolidated financial results
         konsolidasian interim Grup dalam berbagai cara,               and financial position in a number of ways,
         diantaranya:                                                  including the following:

          Nilai tercatat aset dapat terpengaruh akibat                   Asset carrying amounts may be affected due
           perubahan estimasi arus kas masa depan.                         to changes in the estimated future cash
                                                                           flows.
          Penyusutan, deplesi, dan amortisasi yang                       Depreciation, depletion and amortisation
           dibebankan ke dalam laba rugi dapat berubah                     charged to profit or loss may change where
           dimana beban-beban tersebut ditentukan                          such charges are determined based on the
           berdasarkan metode unit produksi, atau                          unit-of-production method or where the
           dimana masa manfaat ekonomi umur aset                           economic useful lives of assets change.
           berubah.
          Provisi penutupan tambang dapat berubah                        Provision for mine closure may change
           apabila terjadi perubahan dalam perkiraan                       where changes in estimated reserves affect
           cadangan yang mempengaruhi ekspektasi                           expectations about the timing or cost of
           tentang waktu atau biaya kegiatan ini.                          these activities.
          Nilai tercatat aset/liabilitas pajak tangguhan                 The carrying amount of deferred tax
           dapat berubah karena perubahan estimasi                         assets/liabilities may change due to changes
           atas kemungkinan terpulihkannya manfaat                         in estimates of the likelihood of the
           pajak.                                                          recoverability of the tax benefits.

     -   Estimasi masa manfaat aset tetap                        -     Estimating useful lives of fixed assets

         Grup mengestimasi masa manfaat ekonomis                       The Group estimates the useful lives of its fixed
         aset tetap berdasarkan utilisasi dari aset yang               assets based on expected asset utilisation
         diharapkan dan didukung dengan rencana dan                    based on business plans and strategies that also
         strategi usaha dan perilaku pasar. Estimasi dari              consider expected market behaviour. The
         masa manfaat aset tetap adalah berdasarkan                    estimation of the useful lives of fixed assets is
         penelaahan Grup terhadap praktek industri,                    based on the Group’s assessment of industry
         evaluasi teknis internal dan pengalaman untuk                 practice, internal technical evaluation and
         aset yang setara. Estimasi masa manfaat                       experience with similar assets. The estimated
         ditelaah minimal setiap akhir periode pelaporan               useful lives are reviewed at least each financial
         dan diperbarui jika ekspektasi berbeda dari                   period-end and are updated if expectations differ
         estimasi sebelumnya dikarenakan pemakaian                     from previous estimates due to physical wear
         dan kerusakan fisik, keusangan secara teknis                  and tear, technical or commercial obsolescence
         atau komersial dan hukum atau pembatasan lain                 and legal or other limitations on the use of the
         atas penggunaan dari aset. Tetapi, adalah                     assets. However, it is possible that future results
         mungkin, hasil di masa depan dari operasi dapat               of operations could be materially affected by
         dipengaruhi secara material oleh perubahan-                   changes in the estimates brought about by
         perubahan dalam estimasi yang diakibatkan                     changes in the factors mentioned above.
         oleh perubahan faktor-faktor yang disebutkan di
         atas.
Page 75
                                     PT ADARO ENERGY INDONESIA Tbk
                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/63 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                 30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                              (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                       unless otherwise stated)

3.   ESTIMASI DAN PERTIMBANGAN AKUNTANSI                      3.   CRITICAL ACCOUNTING                ESTIMATES        AND
     YANG PENTING (lanjutan)                                       JUDGEMENTS (continued)

     -   Penurunan nilai aset non-keuangan                         -     Impairment of non-financial assets

         Jumlah nilai yang dapat dipulihkan kembali dari                 The recoverable amount of a cash-generating
         sebuah aset atau kelompok aset penghasil kas                    asset or group of assets is measured at the
         diukur berdasarkan nilai yang lebih tinggi antara               higher of its fair value less costs of disposal or
         nilai wajar dikurangi biaya untuk menjual atau                  value in use. The determination of fair value less
         nilai pakai. Penentuan nilai wajar dikurangi biaya              costs of disposal or value in use requires
         untuk menjual atau nilai pakai mewajibkan                       management          to   make     estimates    and
         manajemen untuk membuat estimasi dan                            assumptions regarding expected production
         asumsi atas tingkat produksi yang diharapkan,                   levels, sales volumes, commodity prices
         volume        penjualan,     harga      komoditas               (considering current and historical prices, price
         (mempertimbangkan harga saat ini dan harga                      trends and related factors), reserves (see
         masa lalu, tren harga, dan faktor-faktor terkait),              ‘Reserve estimates’), operating costs, inflation
         cadangan (lihat ‘Estimasi cadangan’), biaya                     rate, projected cash flows and post-tax discount
         operasi, tingkat inflasi, proyeksi arus kas dan                 rates. These estimates and assumptions are
         tingkat diskonto setelah pajak, belanja modal di                subject to risk and uncertainty, and hence there
         masa depan dan jangka waktu konsesi                             is a possibility that changes in circumstances will
         pertambangan. Estimasi dan asumsi ini terpapar                  alter these projections, which may have an
         risiko dan ketidakpastian, sehingga terdapat                    impact on the recoverable amount of the assets.
         kemungkinan perubahan situasi yang dapat                        In such circumstances, some or all of the
         mengubah proyeksi ini, sehingga dapat                           carrying amounts of the assets may be further
         mempengaruhi nilai aset yang dapat dipulihkan                   impaired or the impairment charges may be
         kembali. Dalam keadaan seperti itu, sebagian                    reduced with the impact being recorded in profit
         atau seluruh nilai tercatat aset mungkin akan                   or loss.
         mengalami penurunan nilai lebih lanjut atau
         terjadi pengurangan rugi penurunan nilai yang
         dampaknya akan dicatat dalam laba rugi.

     -   Kewajiban pensiun                                         -     Pension obligations

         Nilai kini kewajiban pensiun tergantung pada                    The present value of the pension obligation
         sejumlah faktor yang ditentukan berdasarkan                     depends on a number of factors that are
         basis dari aktuaria dengan menggunakan                          determined on an actuarial basis using a
         sejumlah asumsi. Asumsi yang digunakan dalam                    number of assumptions. The assumptions used
         menentukan beban/(pendapatan) bersih untuk                      in determining the net cost/(income) for
         pensiun termasuk tingkat diskonto, perubahan                    pensions include the discount rate, future
         remunerasi masa depan, tingkat pengurangan                      remuneration changes, employee attrition rates,
         karyawan, tingkat harapan hidup dan periode                     life expectancy and the expected remaining
         sisa yang diharapkan dari masa aktif karyawan.                  service periods of employees. Any changes in
         Setiap perubahan dalam asumsi-asumsi ini akan                   these assumptions will have an impact on the
         berdampak pada nilai tercatat atas kewajiban                    carrying amount of the pension obligation.
         pensiun.

         Grup menentukan tingkat diskonto yang sesuai                    The Group determines the appropriate discount
         pada setiap akhir periode. Tingkat suku bunga                   rate at the end of each period. This is the interest
         inilah yang digunakan untuk menentukan nilai                    rate used to determine the present value of
         kini dari estimasi arus kas keluar masa depan                   estimated future cash outflows expected to be
         yang akan dibutuhkan untuk memenuhi                             required to settle the related pension obligation.
         kewajiban pensiun. Dalam menentukan tingkat                     In determining the appropriate discount rate, the
         diskonto yang sesuai, Grup menggunakan                          Group considers the interest rates of high-
         tingkat suku bunga obligasi korporat berkualitas                quality corporate bonds (or government bonds,
         tinggi (atau obligasi pemerintah, dengan                        if there is no deep market for high quality
         pertimbangan saat ini tidak ada pasar aktif untuk               corporate bonds) that are denominated in the
         obligasi korporat berkualitas tinggi) dalam mata                currency in which the benefits will be paid and
         uang yang sama dengan mata uang imbalan                         that have terms to maturity approximating the
         yang akan dibayarkan dan memiliki waktu jatuh                   terms of the related pension obligation.
         tempo yang kurang lebih sama dengan waktu
         jatuh    tempo     kewajiban     pensiun     yang
         bersangkutan.
Page 76
                                      PT ADARO ENERGY INDONESIA Tbk
                                 DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                Lampiran 5/64 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                 NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                       FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                   30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                                (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                         unless otherwise stated)

3.   ESTIMASI DAN PERTIMBANGAN AKUNTANSI                        3.   CRITICAL ACCOUNTING                 ESTIMATES        AND
     YANG PENTING (lanjutan)                                         JUDGEMENTS (continued)

     -   Kewajiban pensiun (lanjutan)                                -     Pension obligations (continued)

         Asumsi kunci lainnya untuk kewajiban pensiun                      Other key assumptions for pension obligation
         didasarkan sebagian pada kondisi pasar saat ini.                  benefits are based in part on current market
                                                                           conditions.

     -   Estimasi nilai wajar                                        -     Fair value estimation

         Ketika nilai wajar aset keuangan dan liabilitas                   When the fair values of financial assets and
         keuangan dicatat dalam laporan posisi                             financial liabilities recorded in the interim
         keuangan konsolidasian interim tidak dapat                        consolidated statements of financial position
         diukur berdasarkan harga dikutip dalam pasar                      cannot be measured based on quoted prices in
         aktif, nilai wajar ditentukan menggunakan teknik                  active markets, their fair value is measured
         penilaian yang mencakup model Diskonto Arus                       using     valuation     techniques       including
         Kas (“DAK”). Input untuk model ini diambil dari                   Discounted Cash Flow (“DCF”) models. The
         pasar yang dapat diobservasi dimana                               inputs to these models are taken from
         memungkinkan, tetapi tidak mudah dilakukan,                       observable markets where possible, but where
         membutuhkan tingkat pertimbangan dalam                            this is not feasible, a degree of judgement is
         menentukan nilai wajar tersebut. Pertimbangan                     required in establishing fair values. Judgements
         mencakup pertimbangan atas input seperti risiko                   include considerations of inputs such as liquidity
         likuiditas, risiko kredit dan volatilitas. Perubahan              risk, credit risk and volatility. Changes in
         asumsi mengenai faktor-faktor tersebut dapat                      assumptions about these factors could affect
         mempengaruhi nilai wajar instrumen keuangan                       the reported fair value of financial instruments.
         yang dilaporkan. Lihat Catatan 42(2) untuk                        Refer to Note 42(2) for further disclosures.
         informasi lebih lanjut.

     -   Kepentingan dalam pengaturan bersama                        -     Interests in joint arrangements

         Pertimbangan diperlukan untuk menentukan                          Judgement is required to determine when the
         ketika Grup memiliki pengendalian bersama,                        Group has joint control, which requires an
         yang membutuhkan penilaian mengenai                               assessment of the relevant activities and when
         aktivitas yang relevan dan ketika keputusan                       the decisions in relation to those activities
         yang berkaitan dengan aktivitas tersebut                          require unanimous consent. The Group has
         membutuhkan persetujuan dengan suara bulat.                       determined that the relevant activities for its joint
         Grup menentukan bahwa aktivitas yang relevan                      arrangements are those relating to the financial,
         untuk pengaturan bersama adalah aktivitas yang                    operating and capital decisions of the
         berkaitan    dengan   keputusan     keuangan,                     arrangement.
         operasional dan modal dari pengaturan tersebut.

         Pertimbangan      juga     diperlukan     untuk                   Judgement is also required to classify a joint
         mengklasifikasikan     pengaturan     bersama                     arrangement as either a joint operation or a joint
         sebagai pengendalian bersama atau ventura                         venture. Classifying the arrangement requires
         bersama. Pengklasifikasian pengaturan tersebut                    the Group to assess its rights and obligations
         mengharuskan Grup untuk menilai hak dan                           arising from the arrangement. Specifically, it
         kewajiban yang timbul dari pengaturan tersebut.                   considers:
         Secara khusus, Grup mempertimbangkan:

            Struktur dari pengaturan bersama - apakah                        The structure of the joint arrangement
             dibentuk melalui kendaraan terpisah.                              whether it is structured through a separate
                                                                               vehicle.
            Ketika pengaturan tersebut terstruktur                           When the arrangement is structured through
             melalui kendaraan terpisah, Grup juga                             a separate vehicle, the Group also
             mempertimbangkan hak dan kewajiban yang                           considers the rights and obligations arising
             timbul dari:                                                      from:

             a. Bentuk legal dari kendaraan terpisah;                          a. The legal form of the separate vehicle;
             b. Persyaratan dari perjanjian kontraktual;                       b. The     terms    of    the    contractual
                dan                                                               arrangement; and
             c. Fakta dan kondisi lainnya, jika relevan.                       c. Other relevant facts and circumstances.
Page 77
                                        PT ADARO ENERGY INDONESIA Tbk
                                   DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                               Lampiran 5/65 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                 NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                       FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                   30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                                (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                         unless otherwise stated)

3.     ESTIMASI DAN PERTIMBANGAN AKUNTANSI                     3.    CRITICAL ACCOUNTING               ESTIMATES         AND
       YANG PENTING (lanjutan)                                       JUDGEMENTS (continued)

       -   Kepentingan     dalam     pengaturan    bersama           -     Interests in joint arrangements (continued)
           (lanjutan)

           Penilaian ini sering membutuhkan pertimbangan                   This assessment often requires significant
           yang signifikan. Kesimpulan yang berbeda                        judgement. A different conclusion on joint control
           mengenai pengendalian bersama dan apakah                        and on whether the arrangement is a joint
           suatu pengaturan adalah sebuah operasi                          operation or a joint venture, may materially affect
           bersama atau ventura bersama, dapat memiliki                    the interim consolidated financial statements.
           dampak material terhadap laporan keuangan
           konsolidasian interim.

           Grup memiliki pengaturan bersama yang                           The Group has joint arrangements that are
           terstruktur   melalui     ventura       bersama,                structured through joint ventures, being
           PT Bhimasena Power Indonesia (“BPI”),                           PT Bhimasena Power Indonesia (“BPI”),
           PT Tanjung Power Indonesia (“TPI”), Kestrel                     PT Tanjung Power Indonesia (“TPI”), Kestrel
           Coal Group Pty Ltd (“Kestrel”), PT Dumai Tirta                  Coal Group Pty Ltd (“Kestrel”), PT Dumai Tirta
           Persada (“DTP”), PT Grenex Tirta Mandiri                        Persada (“DTP”), PT Grenex Tirta Mandiri
           (“GTM”), PT Bhakti Energi Persada dan entitas                   (“GTM”), PT Bhakti Energi Persada and its
           anaknya (“BEP”), PT Kayan Hydropower                            subsidiaries (“BEP”), PT Kayan Hydropower
           Nusantara (“KHN”) dan TCU. Struktur dan                         Nusantara (“KHN”) and TCU. These structures
           persyaratan    dari    perjanjian     kontraktual               and the terms of the contractual arrangements
           mengindikasikan bahwa Grup memiliki hak atas                    indicate that the Group has rights to the net
           aset bersih dari pengaturan bersama tersebut.                   assets of the arrangements. The Group also
           Grup menilai fakta dan kondisi lain yang                        assessed the other facts and circumstances
           berkaitan   dengan     pengaturan       ini  dan                relating to these arrangements and concluded
           menyimpulkan bahwa pengaturan tersebut                          that the arrangements are joint ventures. Refer
           merupakan sebuah ventura bersama. Lihat                         to Note 11 for further information.
           Catatan 11 untuk informasi lebih lanjut.


4.   KAS DAN SETARA KAS                                        4.    CASH AND CASH EQUIVALENTS

                                          30 September          31 Desember/
                                              2023             December 2022

     Kas                                                53                   46                               Cash on hand

     Kas di bank - Rupiah                                                                        Cash in banks - Rupiah
     PT Bank Mandiri (Persero) Tbk                                                          PT Bank Mandiri (Persero) Tbk
        (“Bank Mandiri”)                            69,497                40,513                        (“Bank Mandiri”)
     PT Bank OCBC NISP Tbk                          65,253               122,541                PT Bank OCBC NISP Tbk
     PT Bank Permata Tbk                            33,968                 8,654                    PT Bank Permata Tbk
     PT Bank UOB Indonesia                          22,980                38,973                 PT Bank UOB Indonesia
     PT Bank Rakyat Indonesia                                                                   PT Bank Rakyat Indonesia
        (Persero) Tbk (“BRI”)                       20,719                65,103                   (Persero) Tbk (“BRI”)
     PT Bank BTPN Tbk                               17,459                21,965                      PT Bank BTPN Tbk
     PT Bank DBS Indonesia                           6,145                26,362                  PT Bank DBS Indonesia
     Lain-lain                                      19,915                11,506                                   Others

     Total rekening - Rupiah                      255,936                335,617                      Total Rupiah accounts
Page 78
                                       PT ADARO ENERGY INDONESIA Tbk
                                  DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/66 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                  FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                              30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                           (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                    unless otherwise stated)

4.   KAS DAN SETARA KAS (lanjutan)                           4.    CASH AND CASH EQUIVALENTS (continued)

                                         30 September         31 Desember/
                                             2023            December 2022

     Kas di bank - Dolar AS                                                             Cash in banks - US Dollars
     BRI                                         773,886            640,338                                   BRI
     Bank Mandiri                                600,453          1,013,188                           Bank Mandiri
     PT Bank UOB Indonesia                       347,335            332,903                PT Bank UOB Indonesia
     PT Bank DBS Indonesia                       119,472             99,109                 PT Bank DBS Indonesia
     PT Bank BTPN Tbk                             90,819            191,973                     PT Bank BTPN Tbk
     PT Bank Permata Tbk                          90,344             70,256                   PT Bank Permata Tbk
     PT Bank OCBC NISP Tbk                        63,542            205,067               PT Bank OCBC NISP Tbk
     DBS Bank Ltd                                 62,699            174,471                          DBS Bank Ltd
     PT Bank Maybank Indonesia                    52,236             56,537             PT Bank Maybank Indonesia
     Sumitomo Mitsui Banking
        Corporation                               48,607             31,243     Sumitomo Mitsui Banking Corporation
     PT Bank Negara Indonesia                                                            PT Bank Negara Indonesia
        (Persero) Tbk (“BNI”)                     42,300                  9                  (Persero) Tbk (“BNI”)
     United Overseas Bank Ltd                     34,925             29,599              United Overseas Bank Ltd
     Standard Chartered Bank                       7,067             38,452               Standard Chartered Bank
     PT Bank HSBC Indonesia (“HSBC”)                 178             70,280      PT Bank HSBC Indonesia (“HSBC”)
     Lain-lain                                     7,308              8,186                                   Others

     Total rekening - Dolar AS                 2,341,171          2,961,611                 Total US Dollar accounts

     Kas di bank - Mata uang lain                                                 Cash in banks - Other currencies
     Lain-lain                                     3,132              1,359                                 Others

     Total kas di bank                         2,600,239          3,298,587                      Total cash in banks

     Deposito berjangka - Rupiah                                                            Time deposits - Rupiah
     BRI                                          90,614             48,979                                    BRI
     PT Bank OCBC NISP Tbk                        16,273             57,240                PT Bank OCBC NISP Tbk
     Lain-lain                                     3,181              3,895                                  Others

     Total deposito berjangka -
        Rupiah                                   110,068            110,114               Total Rupiah time deposits

     Deposito berjangka - Dolar AS                                                      Time deposits - US Dollars
     PT Bank QNB Indonesia Tbk                   230,108             20,000             PT Bank QNB Indonesia Tbk
     PT Bank OCBC NISP Tbk                       132,201            338,611               PT Bank OCBC NISP Tbk
     BNI                                         100,000                  -                                   BNI
     PT Bank BTPN Tbk                             57,000                  -                     PT Bank BTPN Tbk
     PT Bank UOB Indonesia                        50,000                  -                 PT Bank UOB Indonesia
     DBS Bank Ltd                                 40,000                  -                          DBS Bank Ltd
     BRI                                          30,000                  -                                   BRI
     Sumitomo Mitsui Banking
        Corporation                               30,000                  -     Sumitomo Mitsui Banking Corporation
     United Overseas Bank Limited                 25,000                  -           United Overseas Bank Limited
     PT Bank Mega Tbk                             20,000             25,000                      PT Bank Mega Tbk
     PT Bank Permata Tbk                               -            230,000                   PT Bank Permata Tbk
     PT Bank DBS Indonesia                             -             45,000                 PT Bank DBS Indonesia

     Total deposito berjangka -
        Dolar AS                                 714,309            658,611             Total US Dollar time deposits

     Total deposito berjangka                    824,377            768,725                       Total time deposits

     Total                                     3,424,669          4,067,358                                    Total

     Tidak ada kas dan setara kas yang dimiliki oleh pihak         There are no cash and cash equivalents held with
     berelasi.                                                     related parties.
Page 79
                                       PT ADARO ENERGY INDONESIA Tbk
                                  DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                               Lampiran 5/67 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                   FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                               30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                            (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                     unless otherwise stated)

4.   KAS DAN SETARA KAS (lanjutan)                            4.    CASH AND CASH EQUIVALENTS (continued)

     Deposito berjangka yang dimiliki Grup memiliki jatuh           Time deposits owned by the Group have maturity
     tempo kurang dari tiga bulan sejak penempatannya,              dates less than three months since the placement,
     otomatis diperpanjang dan tidak dijaminkan.                    automatically rollover and are unsecured.

     Tingkat suku bunga kontraktual deposito berjangka              The contractual interest rates on time deposits during
     selama periode/tahun berjalan adalah sebagai berikut:          the period/year were as follows:

                                          30 September         31 Desember/
                                              2023            December 2022

      Rupiah                              1.35% - 5.90%       1.35% - 5.00%                                       Rupiah
      Dolar AS                            0.25% - 5.50%       0.25% - 4.50%                                    US Dollars


5.   KAS DAN DEPOSITO BERJANGKA YANG DIBATASI                 5.    RESTRICTED CASH AND TIME DEPOSITS
     PENGGUNAANNYA

                                          30 September         31 Desember/
                                              2023            December 2022

     Kas di bank - Dolar AS                                                                  Cash in bank - US Dollars
     PT Bank Permata Tbk                            4,274               4,110                    PT Bank Permata Tbk

     Deposito berjangka - Rupiah                                                               Time deposits - Rupiah
     BRI                                            3,373               2,792                                      BRI
     Bank Mandiri                                   2,073               2,035                              Bank Mandiri
     BNI                                              769                 205                                      BNI
     PT Bank Pembangunan Daerah                                                          PT Bank Pembangunan Daerah
        Sumatera Selatan                                                                           Sumatera Selatan
        dan Bangka Belitung (“BPD”)                   384                380              and Bangka Belitung (“BPD”)

     Total deposito berjangka -
        Rupiah                                      6,599               5,412                 Total Rupiah time deposits

     Deposito berjangka - Dolar AS                                                          Time deposits - US Dollars
     BRI                                           30,167             24,087                                      BRI
     Bank Mandiri                                  15,012             14,923                             Bank Mandiri

     Total deposito berjangka -
        Dolar AS                                   45,179             39,010               Total US Dollar time deposits

     Total deposito berjangka                      51,778             44,422                          Total time deposits

     Total                                         56,052             48,532                                        Total

     Dikurangi: bagian lancar                       4,274              4,110                      Less: current portion

     Bagian tidak lancar                           51,778             44,422                        Non-current portion

     Tingkat suku bunga kontraktual deposito berjangka yang         The contractual interest rates on the restricted time
     dibatasi penggunaannya selama periode/tahun berjalan           deposits during the period/year were as follows:
     adalah sebagai berikut:

                                          30 September         31 Desember/
                                              2023            December 2022

     Rupiah                               2.25% - 5.90%       2.25% - 4.50%                                       Rupiah
     Dolar AS                             0.20% - 1.75%       0.20% - 1.00%                                    US Dollars

     Tidak ada kas dan deposito berjangka yang dibatasi             There are no restricted cash and time deposits held
     penggunaannya dengan pihak berelasi.                           with related parties.
Page 80
                                      PT ADARO ENERGY INDONESIA Tbk
                                 DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/68 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                   FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                               30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                            (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                     unless otherwise stated)

5.   KAS DAN DEPOSITO BERJANGKA                     YANG      5.    RESTRICTED       CASH     AND     TIME    DEPOSITS
     DIBATASI PENGGUNAANNYA (lanjutan)                              (continued)

     Kas di bank yang dibatasi penggunaannya                        The restricted cash in bank is placed as a debt
     ditempatkan sebagai debt service reserve account               service reserve account (“DSRA”) in PT Bank
     (“DSRA”) pada PT Bank Permata Tbk berkaitan                    Permata Tbk related to a US$80,000 facility
     dengan perjanjian fasilitas AS$80.000 (Catatan 19d).           agreement (Note 19d). The restricted time deposits
     Deposito berjangka yang dibatasi penggunaannya                 are placed as security for mine rehabilitation,
     ditempatkan sebagai jaminan rehabilitasi tambang,              reclamation and post-mining guarantees with Bank
     reklamasi dan pascatambang pada Bank Mandiri, BRI,             Mandiri, BRI, BNI and BPD (Note 40), including
     BNI dan BPD (Catatan 40), termasuk bunga yang                  rolled-over interest on maturity.
     diperpanjang otomatis pada saat jatuh tempo.


6.   INVESTASI LAIN-LAIN                                       6.   OTHER INVESTMENTS

     Rincian seluruh investasi lain-lain yang dimiliki oleh         Details of other investments owned by the Group are
     Grup adalah sebagai berikut:                                   as follows:

                                         30 September          31 Desember/
                                             2023             December 2022

     Aset keuangan pada nilai wajar
        melalui penghasilan
        komprehensif lain                        479,239             483,921                  Financial assets at FVOCI
     Aset keuangan pada nilai wajar
        melalui laba rugi                         66,011              91,592                  Financial assets at FVTPL
     Investasi pada nilai wajar
        melalui laba rugi                                -            21,773                      Investments at FVTPL

     Total                                       545,250             597,286                                         Total

     Dikurangi: bagian lancar                     57,392             104,923                      Less: current portion

     Bagian tidak lancar                         487,858             492,363                        Non-current portion

     a. Aset keuangan pada nilai wajar melalui                      a. Financial assets at FVOCI
        penghasilan komprehensif lain

         Aset keuangan pada nilai wajar melalui                         Financial    assets    at    FVOCI     represent
         penghasilan komprehensif lain terdiri dari                     investments in debt securities in the form of
         investasi pada instrumen utang berupa obligasi                 Government bonds with fixed interest rates of
         Pemerintah dengan bunga tetap 8,5% per tahun                   8.5% per annum with maturities of 12 years
         dengan jatuh tempo 12 tahun (31 Desember 2022:                 (31 December 2022: 13 years), and investments
         13 tahun), dan investasi pada efek utang yang                  in quoted debt and unlisted equity securities with
         mempunyai kuotasi di pasar aktif dan efek ekuitas              maturities of more than one year.
         yang tidak diperdagangkan di bursa dengan jatuh
         tempo lebih dari satu tahun.

         Mutasi nilai wajar atas aset keuangan pada nilai               Fair value movements in financial assets at
         wajar melalui penghasilan komprehensif lain                    FVOCI for the nine-month period ended
         untuk periode sembilan bulan yang berakhir pada                30 September 2023 with net gains amounting to
         tanggal 30 September 2023 dengan keuntungan                    US$10,194 (for the nine-month period ended
         neto sebesar AS$10.194 (untuk periode sembilan                 30 September 2022: net losses of US$1,283)
         bulan yang berakhir pada tanggal 30 September                  are presented in other comprehensive
         2022: kerugian neto AS$1.283) disajikan pada                   income/(loss) for the period.
         penghasilan/(kerugian) komprehensif lain periode
         berjalan.
Page 81
                                      PT ADARO ENERGY INDONESIA Tbk
                                 DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                               Lampiran 5/69 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                   FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                               30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                            (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                     unless otherwise stated)

6.   INVESTASI LAIN-LAIN (lanjutan)                            6.   OTHER INVESTMENTS (continued)

     a.   Aset keuangan pada nilai wajar melalui                    a. Financial assets at FVOCI (continued)
          penghasilan komprehensif lain (lanjutan)

          Penghasilan bunga efektif yang diperoleh dari                 Effective interest income earned on financial
          aset keuangan pada nilai wajar melalui                        assets at FVOCI during the nine-month period
          penghasilan komprehensif lain selama periode                  ended 30 September 2023 amounted to US$184
          sembilan bulan yang berakhir pada tanggal                     (for the nine-month period ended 30 September
          30 September 2023 adalah sebesar AS$184                       2022: US$187) was presented as part of
          (untuk periode sembilan bulan yang berakhir pada              “Finance income” in the interim consolidated
          tanggal 30 September 2022: AS$187) yang                       statements of profit or loss.
          disajikan sebagai bagian dari “Penghasilan
          keuangan” pada laporan laba rugi konsolidasian
          interim.

          Nilai wajar efek yang tidak diperdagangkan di                 The fair values of unlisted securities are based
          bursa dihitung dari arus kas yang didiskontokan               on discounted cash flows using a rate based on
          dengan menggunakan suku bunga pasar dan                       the market interest rate and risk premium
          premi risiko yang spesifik atas efek yang tidak               specific to the unlisted securities.
          diperdagangkan tersebut.

          Manajemen berpendapat bahwa tidak terdapat                    The management is of the opinion that there are
          kejadian-kejadian atau perubahan keadaan yang                 no events or changes in circumstances that
          mengindikasikan adanya bukti objektif penurunan               indicate a permanent decline in the fair value of
          nilai wajar aset keuangan pada nilai wajar melalui            the financial assets at FVOCI. Therefore, no
          penghasilan komprehensif lain, sehingga, tidak                provision for impairment in the value of the
          diperlukan cadangan penurunan nilai atas aset                 above financial assets is necessary.
          keuangan tersebut.

     b.   Aset keuangan pada nilai wajar melalui laba               b. Financial assets at FVTPL
          rugi

          Aset keuangan pada nilai wajar melalui laba rugi              Financial    assets     at   FVTPL     represent
          terdiri dari investasi pada opsi saham yang                   investments in listed and unlisted share options
          diperdagangkan dan tidak diperdagangkan di                    with various maturities and listed equity
          bursa dengan beberapa periode jatuh tempo dan                 securities with no fixed maturity.
          efek ekuitas yang diperdagangkan di bursa
          dengan tanpa jatuh tempo yang tetap.

          Mutasi nilai wajar atas aset keuangan pada nilai              Fair value movements in financial assets at
          wajar melalui laba rugi untuk periode sembilan                FVTPL for the nine-month period ended
          bulan yang berakhir pada tanggal 30 September                 30 September 2023 with net losses amounting to
          2023 dengan kerugian neto sebesar AS$27.402                   US$27,402 (for the nine-month period ended
          (untuk periode sembilan bulan yang berakhir pada              30 September 2022: net losses amounting to
          tanggal 30 September 2022: kerugian neto                      US$2,202), are presented as part of “Other
          sebesar AS$2.202) disajikan sebagai bagian dari               (expenses)/income, net” in the interim
          “(Beban)/pendapatan lain-lain, neto” pada laporan             consolidated statements of profit or loss
          laba rugi konsolidasian interim (Catatan 32).                 (Note 32).

          Nilai wajar efek yang diperdagangkan di bursa                 The fair values of listed securities are based on
          dihitung berdasarkan harga dikutip dalam pasar                quoted prices in active markets for identical
          aktif untuk aset yang identik.                                assets.
Page 82
                                       PT ADARO ENERGY INDONESIA Tbk
                                  DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                Lampiran 5/70 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                 30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                              (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                       unless otherwise stated)

6.   INVESTASI LAIN-LAIN (lanjutan)                              6.   OTHER INVESTMENTS (continued)

     c. Investasi pada nilai wajar melalui laba rugi                  c. Investments at FVTPL

          Investasi pada emas dicatat pada nilai wajar                   Investments in gold are recorded at FVTPL. At
          melalui laba rugi. Setiap tanggal pelaporan, Grup              each reporting date, the Group records the
          mencatat perubahan nilai wajarnya pada laba rugi.              changes in fair value in profit or loss. For the
          Untuk periode sembilan bulan yang berakhir pada                nine-month period ended 30 September 2023,
          tanggal 30 September 2023, Grup telah melakukan                the Group sold all the investment in gold and
          penjualan seluruh investasi pada emas dan                      recorded net gains on fair value of the
          mencatat keuntungan neto nilai wajar atas                      investments in gold amounted to US$1,340 (for
          investasi pada emas sebesar AS$1.340 (untuk                    the nine-month period ended 30 September
          periode sembilan bulan yang berakhir pada                      2022: net losses of US$2,190). The Group
          tanggal 30 September 2022: kerugian neto                       presented this amount as part of “Other
          AS$2.190). Grup menyajikan jumlah ini sebagai                  (expenses)/income, net” in the interim
          bagian dari “(Beban)/pendapatan lain-lain, neto”               consolidated statements of profit or loss
          pada laporan laba rugi konsolidasian interim                   (Note 32).
          (Catatan 32).

          Investasi emas dinilai berdasarkan harga emas                  Investments in gold are valued using the London
          yang ditentukan di London Bullion Market                       Bullion Market Association gold price.
          Association.

     Eksposur maksimum atas risiko kredit pada tanggal                The maximum exposure to credit risk at the reporting
     pelaporan adalah sebesar nilai tercatat investasi pada           date is the carrying amount of the investments in
     efek utang dan ekuitas yang diklasifikasikan sebagai             debt and equity securities classified as financial
     aset keuangan pada nilai wajar melalui penghasilan               assets at FVOCI and FVTPL.
     komprehensif lain dan melalui laba rugi.

     Investasi lain-lain didenominasikan dalam mata uang              Other investments are denominated in US Dollars
     Dolar AS dan Rupiah.                                             and Rupiah.

     Pada tanggal 30 September 2023 dan 31 Desember                   As at 30 September 2023 and 31 December 2022,
     2022, tidak ada investasi lain-lain pada pihak berelasi.         there were no other investments with related parties.

     Lihat Catatan 42(2) untuk informasi nilai wajar dari             Refer to Note 42(2) for information on the fair value
     investasi lain-lain.                                             of other investments.


7.   PIUTANG USAHA DAN PIUTANG LAIN-LAIN                         7.   TRADE AND OTHER RECEIVABLES

     a.   Piutang usaha                                               a. Trade receivables

                                          30 September           31 Desember/
                                              2023              December 2022

          Pihak ketiga                             364,573             594,367                               Third parties
          Pihak berelasi                            54,761              63,347                             Related parties

          Sub-total                                419,334             657,714                                   Sub-total
          Dikurangi: cadangan kerugian             (13,097)            (10,561)                      Less: loss allowance

          Total, neto                              406,237             647,153                                  Total, net

          Piutang usaha Grup berdasarkan mata uang                       The Group’s trade receivables are denominated
          adalah sebagai berikut:                                        in the following currencies:

                                          30 September           31 Desember/
                                              2023              December 2022

          Dolar AS                                 252,247             458,262                                  US Dollars
          Rupiah                                   167,087             199,452                                     Rupiah

          Total                                    419,334             657,714                                       Total
Page 83
                                         PT ADARO ENERGY INDONESIA Tbk
                                    DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                               Lampiran 5/71 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                             (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                      unless otherwise stated)

7.   PIUTANG      USAHA       DAN    PIUTANG    LAIN-LAIN       7.   TRADE AND OTHER RECEIVABLES (continued)
     (lanjutan)
     a.   Piutang usaha (lanjutan)                                   a. Trade receivables (continued)

          Analisis umur piutang usaha adalah sebagai                    The aging analysis of trade receivables is as
          berikut:                                                      follows:
                                           30 September         31 Desember/
                                               2023            December 2022

          Lancar                                  389,485             625,508                                  Current
          Jatuh tempo 1 - 30 hari                   4,264              17,222                   Overdue by 1 - 30 days
          Jatuh tempo 31 - 60 hari                  2,953               1,280                  Overdue by 31 - 60 days
          Jatuh tempo 61 - 90 hari                  1,878                 398                  Overdue by 61 - 90 days
          Jatuh tempo lebih dari 90 hari           20,754              13,306             Overdue by more than 90 days

          Total                                   419,334             657,714                                        Total
          Perubahan cadangan kerugian piutang usaha                     The changes in the loss allowance on trade
          adalah sebagai berikut:                                       receivables were as follows:

                                           30 September         31 Desember/
                                               2023            December 2022

                                                                                              Balance at the beginning of
          Saldo awal periode/tahun                 10,561               3,274                          the period/year
          Penambahan                                2,616               7,374                                  Additions
          Pembalikan cadangan
            kerugian                                   (80)               (80)                Reversal of loss allowance
          Penghapusan                                    -                 (7)                                Written-off
                                                                                                  Balance at the end of
          Saldo akhir periode/tahun                13,097              10,561                         the period/year

          Penambahan cadangan kerugian piutang usaha                    Additions on loss allowance on trade receivables
          disajikan oleh Grup sebagai bagian dari “Beban                is presented by the Group as part of “Operating
          usaha - umum dan administrasi - lain-lain” dalam              expenses - general and administrative - others”
          laporan    laba   rugi  konsolidasian     interim             in the interim consolidated statements of profit or
          (Catatan 31).                                                 loss (Note 31).

          Lihat Catatan 34 untuk informasi rincian transaksi            Refer to Note 34 for information on the details of
          dan saldo dengan pihak berelasi.                              transactions and balances with related parties.
          Lihat Catatan 42(1) untuk informasi tentang risiko            Refer to Note 42(1) for information about the
          kredit Grup.                                                  Group’s exposure to credit risk.
          Manajemen berkeyakinan bahwa cadangan yang                    Management believes the established allowance
          dibentuk cukup untuk menutupi penurunan nilai                 is adequate to cover the impairment of trade
          dari piutang usaha.                                           receivables.
     b.   Piutang lain-lain                                          b. Other receivables
                                           30 September         31 Desember/
                                               2023            December 2022
          Pihak ketiga                            107,608              90,563                               Third parties
          Pihak berelasi                           23,523              17,557                             Related parties

          Total                                   131,131             108,120                                        Total
          Dikurangi: bagian lancar                 41,103              17,821                     Less: current portion
          Bagian tidak lancar                      90,028              90,299                       Non-current portion

          Pada tanggal 30 September 2023 dan                            As at 30 September 2023 and 31 December
          31 Desember 2022, piutang lain-lain sebagian                  2022, other receivables mainly represent
          besar merupakan piutang dari EGAT International               receivables from EGAT International Company
          Company Limited (“EGATi”), kepentingan non-                   Limited (“EGATi”), a non-controlling interest
          pengendali (Catatan 25).                                      (Note 25).
Page 84
                                       PT ADARO ENERGY INDONESIA Tbk
                                  DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                               Lampiran 5/72 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                             (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                      unless otherwise stated)

7.   PIUTANG      USAHA     DAN     PIUTANG     LAIN-LAIN       7.   TRADE AND OTHER RECEIVABLES (continued)
     (lanjutan)
     b.   Piutang lain-lain (lanjutan)                               b. Other receivables (continued)
          Lihat Catatan 34 untuk informasi rincian transaksi            Refer to Note 34 for information on the details of
          dan saldo dengan pihak berelasi.                              transactions and balances with related parties.
          Lihat Catatan 42(1) untuk informasi tentang risiko            Refer to Note 42(1) for information about the
          kredit Grup.                                                  Group’s exposure to credit risk.
          Manajemen Grup berpendapat bahwa cadangan                     The Group’s management is of the opinion that
          kerugian atas piutang lain-lain pada tanggal                  the loss allowance of other receivables as at
          30 September 2023 dan 31 Desember 2022 tidak                  30 September 2023 and 31 December 2022 is
          material sehingga cadangan kerugian kredit                    not material. Therefore, a provision for ECL is not
          ekspektasian tidak diperlukan.                                considered necessary.

8.   UANG MUKA DAN BIAYA DIBAYAR DIMUKA                        8.    ADVANCES AND PREPAYMENTS
                                          30 September          31 Desember/
                                              2023             December 2022
     Uang muka pembelian aset                                                         Advances for the purchase of fixed
       tetap dan proyek                           121,124              38,642                     assets and projects
     Uang muka royalti                             16,594                    -                        Royalty advances
     Uang muka kepada pemasok                      11,224               7,092                    Advances to suppliers
     Sewa dan asuransi dibayar
       dimuka                                       5,320               4,863                  Prepaid rent and insurance
     Lain-lain                                     13,370               3,974                                      Others
     Total                                        167,632              54,571                                            Total
     Dikurangi: bagian lancar                      46,003              15,616                      Less: current portion
     Bagian tidak lancar                          121,629              38,955                          Non-current portion
     Manajemen berpendapat bahwa seluruh uang muka                   Management     believes    that    all   advances    are
     tersebut dapat dipulihkan.                                      recoverable.

9.   PERSEDIAAN                                                9.    INVENTORIES
                                          30 September          31 Desember/
                                              2023             December 2022
     Persediaan batubara                          158,866             131,920                                 Coal inventory
     Suku cadang                                   42,153              35,867                                   Spare parts
     Bahan bakar dan minyak
       pelumas                                     41,475              25,258                           Fuel and lubricants
     Perlengkapan dan bahan
       pendukung                                   10,861               5,614                            Tools and supplies
     Lain-lain                                      2,083                 541                                       Others

     Total                                        255,438             199,200                                            Total
     Pada tanggal 30 September 2023 dan 31 Desember                  As at 30 September 2023 and 31 December 2022,
     2022, persediaan Grup telah diasuransikan terhadap              the Group’s inventories were covered by insurance
     risiko kerusakan signifikan dengan nilai pertanggungan          against the risk of material damage with total
     sebesar AS$97.735 (31 Desember 2022: AS$90.709).                coverage of US$97,735 (31 December 2022:
     Manajemen Grup berpendapat bahwa persediaan                     US$90,709). The Group’s management is of the
     telah diasuransikan secara memadai untuk menutupi               opinion that the inventories are adequately insured
     risiko kehilangan dan kerusakan.                                to cover the risk of loss and damage.
     Manajemen Grup berpendapat bahwa semua                          The Group’s management is of the opinion that the
     persediaan dapat digunakan atau dijual dan nilai                inventories can be either used or sold and the net
     realisasi neto persediaan masih melebihi nilai tercatat         realisable value of inventories exceeds the carrying
     persediaan, sehingga tidak diperlukan adanya provisi            amount of inventories. Therefore, a provision for
     persediaan usang dan penurunan nilai pada tanggal               obsolete stock and decline in value is not considered
     30 September 2023 dan 31 Desember 2022.                         necessary as at 30 September 2023 and
                                                                     31 December 2022.
Page 85
                                                     PT ADARO ENERGY INDONESIA Tbk
                                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                                      Lampiran 5/73 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                        NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                              FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                                                          30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                                                                       (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                                                                unless otherwise stated)

10. ASET TETAP                                                                                   10.          FIXED ASSETS
                                                                                30 September 2023
                                                                                                                             Selisih
                                                                                                                          kurs dari
                                                                                                                         penjabaran
                                                                                                                            laporan
                                                                                                                         keuangan/
                                                                                                                         Exchange
                                                                                                                         differences
                                           Saldo                                                                             due to            Saldo
                                           awal/                                                                           financial           akhir/
                                         Beginning         Penambahan/        Pengurangan/         Reklasifikasi/        statements           Ending
                                          balance           Additions1)         Disposals        Reclassifications2)     translation          balance


   Harga perolehan                                                                                                                                                      Acquisition costs
   Kepemilikan langsung                                                                                                                                                   Direct ownership
   Tanah                                        38,204              4,124                 -                    (1,447)             209             41,090                                Land
   Bangunan                                    192,626              2,765              (206)                    4,961              166            200,312                          Buildings
   Infrastruktur                               306,274              7,431                 -                     9,974               66            323,745                     Infrastructure
   Pembangkit listrik                          143,565                  -                 -                         -                -            143,565                     Power plants
   Mesin, peralatan                                                                                                                                                Machineries, operational
     operasional dan kendaraan               1,947,015           145,483             (52,073)                  95,013              256          2,135,694         equipment and vehicles
   Kapal                                       377,473            18,966              (2,015)                  14,663              170            409,257                           Vessels
   Peralatan kantor                             33,275             4,034                  (2)                     354               41             37,702                 Office equipment
   Fasilitas peremukan                                                                                                                                               Crushing and handling
     dan pengolahan                            526,473                    -                  -                   862                     -        527,335                         facilities
   Jalan dan jembatan                          449,110                    -                  -                     -                     -        449,110               Roads and bridges

   Sub-total                                 4,014,015           182,803             (54,296)                 124,380              908          4,267,810                          Sub-total

   Aset dalam pembangunan                       52,903           171,615                     -                (38,080)                 (99)       186,339           Construction in progress

   Aset hak-guna                                                                                                                                                        Right-of-use assets
   Tanah                                         2,320                  -                  -                        -                   -           2,320                             Land
   Bangunan                                     10,076              3,091                 (7)                       -                  50          13,210                         Buildings
   Mesin, peralatan                                                                                                                                                Machineries, operational
    operasional dan kendaraan                  172,585            50,236              (1,524)                 (89,268)                  3         132,032         equipment and vehicles
   Peralatan kantor                                 72                 -                   -                        -                   -              72                 Office equipment

   Sub-total                                   185,053            53,327              (1,531)                 (89,268)                 53         147,634                          Sub-total

   Total                                     4,251,971           407,745             (55,827)                  (2,968)             862          4,601,783                              Total

   Akumulasi penyusutan                                                                                                                                         Accumulated depreciation
   Kepemilikan langsung                                                                                                                                                   Direct ownership
   Bangunan                                    (88,800)            (7,170)              108                         9                  (56)       (95,909)                         Buildings
   Infrastruktur                              (161,064)           (12,853)                -                         -                  (29)      (173,946)                    Infrastructure
   Pembangkit listrik                          (54,941)            (4,297)                -                         -                    -        (59,238)                    Power plants
   Mesin, peralatan                                                                                                                                                Machineries, operational
     operasional dan kendaraan               (1,503,215)         (111,586)           47,255                   (66,983)                 (60)     (1,634,589)       equipment and vehicles
   Kapal                                       (174,344)          (16,283)              484                         -                  (31)       (190,174)                         Vessels
   Peralatan kantor                             (28,786)           (1,741)                2                         2                  (27)        (30,550)               Office equipment
   Fasilitas peremukan                                                                                                                                               Crushing and handling
     dan pengolahan                           (386,524)            (5,313)                   -                      -                    -       (391,837)                        facilities
   Jalan dan jembatan                         (289,841)            (6,435)                   -                      -                    -       (296,276)              Roads and bridges

   Sub-total                                 (2,687,515)         (165,678)           47,849                   (66,972)            (203)         (2,872,519)                        Sub-total

   Aset hak-guna                                                                                                                                                        Right-of-use assets
   Tanah                                           (398)              (98)                   -                      -                    -            (496)                           Land
   Bangunan                                      (5,390)           (1,556)                   2                      -                   (7)         (6,951)                       Buildings
   Mesin, peralatan                                                                                                                                                Machineries, operational
    operasional dan kendaraan                 (100,524)           (16,102)            1,375                    66,972                   (2)       (48,281)        equipment and vehicles
   Peralatan kantor                                (48)               (13)                -                         -                    -            (61)                Office equipment

   Sub-total                                  (106,360)           (17,769)            1,377                    66,972                   (9)       (55,789)                         Sub-total

   Total                                     (2,793,875)         (183,447)           49,226                         -             (212)         (2,928,308)                            Total

   Akumulasi penurunan nilai                                                                                                                                     Accumulated impairment
   Infrastruktur                                 (5,264)                  -                  -                      -                    -          (5,264)                  Infrastructure
   Mesin, peralatan                                                                                                                                                Machineries, operational
     operasional dan kendaraan                    (839)                   -                  -                      -                    -              (839)     equipment and vehicles

   Total                                         (6,103)                  -                  -                      -                    -          (6,103)                            Total

   Nilai buku neto                           1,451,993                                                                                          1,667,372                   Net book value

   1)   Termasuk penambahan dari akuisisi INS sebesar AS$329.                                            1) Including additions from acquisition of INS amounting to US$329.
   2)                                                                                                    2)
        Terdapat reklasifikasi dari aset tetap ke uang dimuka dan biaya dibayar dimuka                        There are reclassifications from fixed assets to advances and prepayments
        dan piutang jasa konsesi sebesar AS$2.968 pada tahun 2023.                                            and service consession receivables amounting to US$2,968 during 2023.
Page 86
                                                     PT ADARO ENERGY INDONESIA Tbk
                                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                                     Lampiran 5/74 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                      NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                            FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                                                        30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                                                                     (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                                                              unless otherwise stated)

10. ASET TETAP (lanjutan)                                                                        10.        FIXED ASSETS (continued)
                                                                             31 Desember/December 2022
                                                                                                                            Selisih
                                                                                                                         kurs dari
                                                                                                                        penjabaran
                                                                                                                           laporan
                                                                                                                        keuangan/
                                                                                                                        Exchange
                                                                                                                        differences
                                            Saldo                                                                           due to           Saldo
                                            awal/                                                                         financial          akhir/
                                          Beginning        Penambahan/        Pengurangan/          Reklasifikasi/      statements          Ending
                                           balance           Additions          Disposals         Reclassifications1)   translation         balance

   Harga perolehan                                                                                                                                                       Acquisition costs
   Kepemilikan langsung                                                                                                                                                    Direct ownership
   Tanah                                         45,210            3,395                     -               (9,080)            (1,321)           38,204                                  Land
   Bangunan                                     164,421           17,970                     -               11,674             (1,439)          192,626                            Buildings
   Infrastruktur                                292,838            3,801                     -               11,424             (1,789)          306,274                       Infrastructure
   Pembangkit listrik                           143,565                -                     -                    -                  -           143,565                       Power plants
   Mesin, peralatan                                                                                                                                                 Machineries, operational
       operasional dan kendaraan              1,693,392          242,258             (40,879)                54,139             (1,895)        1,947,015          equipment and vehicles
   Kapal                                        363,388            1,807              (1,926)                15,464             (1,260)          377,473                             Vessels
   Peralatan kantor                              31,407            3,093                  (7)                  (898)              (320)           33,275                   Office equipment
   Fasilitas peremukan                                                                                                                                                Crushing and handling
       dan pengolahan                           502,766               54                   (54)              23,707                    -         526,473                         facilities
   Jalan dan jembatan                           444,950              101                     -                4,059                    -         449,110                 Roads and bridges

   Sub-total                                  3,681,937          272,479             (42,866)               110,489             (8,024)        4,014,015                            Sub-total

   Aset dalam pembangunan                        41,928           79,542                     -              (68,174)             (393)            52,903             Construction in progress

   Aset hak-guna                                                                                                                                                        Right-of-use assets
   Tanah                                          2,320                -                  -                       -                 -              2,320                               Land
   Bangunan                                       9,278            1,345               (185)                   (220)             (142)            10,076                           Buildings
   Mesin, peralatan                                                                                                                                                 Machineries, operational
      operasional dan kendaraan                 203,300           26,564              (4,067)               (53,121)               (91)          172,585          equipment and vehicles
   Peralatan kantor                                  72                -                   -                      -                  -                72                  Office equipment

   Sub-total                                    214,970           27,909              (4,252)               (53,341)             (233)           185,053                            Sub-total

   Total                                      3,938,835          379,930             (47,118)               (11,026)            (8,650)        4,251,971                                Total

   Akumulasi penyusutan                                                                                                                                          Accumulated depreciation
   Kepemilikan langsung                                                                                                                                                    Direct ownership
   Bangunan                                     (75,050)         (13,521)                    -                 (711)              482            (88,800)                           Buildings
   Infrastruktur                               (145,306)         (16,540)                    -                  381               401           (161,064)                      Infrastructure
   Pembangkit listrik                           (49,212)          (5,729)                    -                    -                 -            (54,941)                      Power plants
   Mesin, peralatan                                                                                                                                                 Machineries, operational
       operasional dan kendaraan             (1,382,030)        (117,960)            36,580                 (40,482)              677         (1,503,215)         equipment and vehicles
   Kapal                                       (155,801)         (20,372)               905                     595               329           (174,344)                            Vessels
   Peralatan kantor                             (27,586)          (2,227)                 7                     805               215            (28,786)                  Office equipment
   Fasilitas peremukan                                                                                                                                                Crushing and handling
       dan pengolahan                          (331,509)         (55,021)                    6                     -                   -        (386,524)                        facilities
   Jalan dan jembatan                          (251,958)         (37,883)                    -                     -                   -        (289,841)                Roads and bridges

   Sub-total                                 (2,418,452)        (269,253)            37,498                 (39,412)            2,104         (2,687,515)                           Sub-total

   Aset hak-guna                                                                                                                                                        Right-of-use assets
   Tanah                                           (263)            (135)                   -                     -                    -            (398)                              Land
   Bangunan                                      (3,685)          (1,880)                  66                    66                   43          (5,390)                          Buildings
   Mesin, peralatan                                                                                                                                                 Machineries, operational
      operasional dan kendaraan                (113,196)         (30,454)             3,041                  40,033                   52        (100,524)         equipment and vehicles
   Peralatan kantor                                 (31)             (17)                 -                       -                    -             (48)                 Office equipment

   Sub-total                                   (117,175)         (32,486)             3,107                  40,099                   95        (106,360)                           Sub-total

   Total                                     (2,535,627)        (301,739)            40,605                     687             2,199         (2,793,875)                               Total

   Akumulasi penurunan nilai                                                                                                                                      Accumulated impairment
   Infrastruktur                                 (5,264)                 -                   -                     -                   -          (5,264)                     Infrastructure
   Mesin, peralatan                                                                                                                                                 Machineries, operational
       operasional dan kendaraan                   (839)                 -                   -                     -                   -              (839)       equipment and vehicles

   Total                                         (6,103)                 -                   -                     -                   -          (6,103)                               Total

   Nilai buku neto                            1,397,105                                                                                        1,451,993                     Net book value

   1)   Terdapat reklasifikasi dari aset tetap ke properti pertambangan, aset takbewujud                  1) There are reclassifications from fixed assets to mining properties, intangible

        dan aset tidak lancar lain-lain sebesar AS$10.339 pada tahun 2022.                                  assets and other   non-current assets amounting to US$10,339 during 2022.
Page 87
                                     PT ADARO ENERGY INDONESIA Tbk
                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                             Lampiran 5/75 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                             (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                      unless otherwise stated)

10. ASET TETAP (lanjutan)                                    10.    FIXED ASSETS (continued)

    Beban penyusutan untuk periode sembilan bulan yang               Depreciation expense for the nine-month periods
    berakhir pada tanggal 30 September 2023 dan 2022                 ended 30 September 2023 and 2022 was allocated
    dialokasikan sebagai berikut:                                    as follows:

                                                   30 September
                                            2023                   2022

    Beban pokok pendapatan
      (Catatan 30)                             177,411               237,601                  Cost of revenue (Note 30)
    Beban usaha (Catatan 31)                     6,036                 4,970               Operating expenses (Note 31)

    Total                                      183,447               242,571                                          Total

    Perhitungan kerugian atas pelepasan aset tetap untuk            The calculation of loss on disposal of fixed assets for
    periode sembilan bulan yang berakhir pada tanggal               the nine-month periods ended 30 September 2023
    30 September 2023 dan 2022 adalah sebagai berikut:              and 2022 was as follows:

                                                   30 September
                                            2023                   2022

    Harga perolehan                              55,827                18,525                          Acquisition costs
    Akumulasi penyusutan                        (49,226)              (14,902)                  Accumulated depreciation

    Nilai buku aset tetap yang dilepas             6,601                  3,623 Carrying amount of disposed fixed assets
    Harga jual dari pelepasan                                                              Selling price from disposal of
      aset tetap                                   2,513                    336                            fixed assets

    Kerugian atas pelepasan                                                                         Loss on disposal of
     aset tetap (Catatan 32)                       (4,088)                (3,287)               fixed assets (Note 32)

    Beberapa aset tetap tertentu AI dicatat dalam laporan            Certain fixed assets of AI recorded in these interim
    keuangan konsolidasian interim ini dan diperoleh                 consolidated financial statements and acquired
    selama masa PKP2B tetap menjadi properti milik                   during the term of the CCA remain the property of
    Pemerintah (Barang Milik Negara atau “BMN”).                     the Government (Barang Milik Negara or “BMN”).
    Berdasarkan IUPK sebagai Kelanjutan Operasi                      Based on the IUPK for the Continuation of
    Kontrak/Perjanjian, AI masih memiliki hak untuk                  Contract/Agreement Operation, AI continues to have
    menggunakan seluruh BMN yang diperoleh selama                    the right to use all BMN which had been acquired
    masa PKP2B sesuai dengan peraturan perundang-                    during the CCA period in accordance with the
    undangan yang berlaku. AI juga diharuskan untuk                  prevailing laws and regulations. AI is also required to
    memelihara dan mengamankan semua properti milik                  maintain and secure all property items of the
    Pemerintah     dan     mengembalikannya       kepada             Government and return them to the Government
    Pemerintah setelah tidak digunakan lagi untuk operasi            once they are no longer used for mining operations,
    pertambangan, dan membayar tarif tertentu atas                   and pay a certain tariff for the utilisation of BMN
    penggunaan BMN (Catatan 39o).                                    (Note 39o).

    Sesuai dengan Perjanjian Kerjasama IBT dengan                    In accordance with the Cooperation Agreement
    Pelindo beserta dengan perubahannya, sebagian aset               between IBT and Pelindo, including its amendment,
    tetap IBT, yang merupakan objek Perjanjian                       certain fixed assets of IBT which are the object of the
    Kerjasama dan berada di dalam wilayah operasi                    Cooperation Agreement and are located in the coal
    pelabuhan batubara, yang dicatat dalam laporan                   port operation and which are recorded in these
    keuangan konsolidasian interim ini akan menjadi milik            interim consolidated financial statements will
    Pelindo setelah berakhirnya 30 tahun periode operasi.            become the property of Pelindo at the end of the 30-
                                                                     year operating period.
Page 88
                                       PT ADARO ENERGY INDONESIA Tbk
                                  DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                 Lampiran 5/76 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                  NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                        FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                    30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                                 (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                          unless otherwise stated)

10.   ASET TETAP (lanjutan)                                    10.       FIXED ASSETS (continued)

      Tidak ada perbedaan signifikan antara nilai wajar dan              There is no significant difference between the fair
      nilai buku aset tetap, kecuali beberapa tanah,                     value and carrying amount of fixed assets, except for
      bangunan serta aset tetap lain. Total nilai wajar dan              certain land, buildings and other fixed assets. The
      nilai buku aset tetap tersebut pada tanggal                        total fair values and the carrying amount of such
      31 Desember 2022 masing-masing adalah sebesar                      fixed assets as at 31 December 2022 were
      AS$450.698 dan AS$418.515. Nilai wajar tersebut                    US$450,698 and US$418,515, respectively. The fair
      berdasarkan laporan penilaian independen terakhir                  value is based on the latest independent appraisal
      dari Kantor Jasa Penilai Publik (“KJPP”) Tobing                    reports by Kantor Jasa Penilai Publik (“KJPP”)
      Panuturi dan Rekan dan KJPP Benedictus                             Tobing Panuturi dan Rekan and KJPP Benedictus
      Dharmapuspita dan Rekan, penilai independen yang                   Dharmapuspita dan Rekan, registered independent
      terdaftar pada OJK, masing-masing No. 00037/2.0171-                valuers      with     OJK,    No.     00037/2.0171-
      00/PI/02/0420/1/II/2023 dan No.         00038/2.071-               00/PI/02/0420/1/II/2023, and No. 00038/2.071-
      00/PI/02/0420/1/II/2023 tertanggal 27 Februari 2023                00/PI/02/0420/1/II/2023 dated 27 February 2023
      dan      No.     00075/2.0103-00/PP/02/0121/1/II/2023              and No. 00075/2.0103-00/PP/02/0121/1/II/2023
      tertanggal 22 Februari 2023, dan termasuk dalam                    dated 22 February 2023, and classified as Level 3 in
      hierarki nilai wajar Tingkat 3.                                    the fair value hierarchy.

      Pada tanggal 30 September 2023, aset tetap Grup                    As at 30 September 2023, the Group’s fixed assets
      telah diasuransikan terhadap semua risiko kerusakan                were insured against all risks of damage, with
      dengan total pertanggungan kurang lebih sebesar                    total coverage of approximately US$5,778,733
      AS$5.778.733 (31 Desember 2022: AS$3.626.617),                     (31 December 2022: US$3,626,617), except for
      kecuali untuk aset tetap yang tidak bisa diasuransikan             fixed assets that could not be insured such as land,
      seperti tanah, pengerukan alur Barito, dan aset dalam              the Barito channel dredging and certain construction
      pembangunan tertentu.                                              in progress.

      Manajemen Grup berpendapat bahwa aset tetap telah                  The Group’s management is of the opinion that the
      diasuransikan secara memadai pada tanggal                          fixed assets were adequately insured as at
      30 September 2023 dan 31 Desember 2022.                            30 September 2023 and 31 December 2022.

      Pada tanggal 30 September 2023, harga perolehan                    As at 30 September 2023, the acquisition costs of
      atas aset tetap Grup yang telah habis nilai buku                   fixed assets with a net book value of zero but which
      netonya tetapi masih dipakai sebesar AS$1.941.771                  are still in use amounted to US$1,941,771
      (31 Desember 2022: AS$1.902.434).                                  (31 December 2022: US$1,902,434).

      Pada tanggal 30 September 2023, aset hak-guna                      As at 30 September 2023, certain right-of-use
      tertentu dengan nilai tercatat sebesar AS$78.907                   assets with a carrying amount of US$78,907
      (31 Desember 2022: AS$69.046) dijaminkan terhadap                  (31 December 2022: US$69,046) were pledged for
      liabilitas sewa tertentu (Catatan 18).                             certain lease liabilities (Note 18).

      Pada tanggal 30 September 2023, beberapa aset tetap                As at 30 September 2023, certain directly-owned
      kepemilikan langsung tertentu dengan nilai buku                    fixed assets of the Group with a carrying value of
      AS$9.482 telah dijaminkan sebagai jaminan untuk                    US$9,482 have been pledged as security for a
      pinjaman    properti  komersial    (Catatan    19f)                commercial property loan (Note 19f) (31 December
      (31 Desember 2022: AS$9.643)                                       2022: US$9,643)

      Aset dalam pembangunan                                             Construction in progress

      Aset dalam pembangunan merupakan proyek yang                       Construction in progress represents projects that
      belum selesai pada tanggal laporan posisi keuangan                 were not completed as at the date of the interim
      konsolidasian interim dengan rincian sebagai berikut:              consolidated statements of financial position as
                                                                         follows:
                                    Persentase        Akumulasi                 Estimasi
                                   penyelesaian/        biaya/                penyelesaian/
               Aset dalam          Percentage of     Accumulated                Estimated                Construction
              pembangunan           completion          costs                  completion                 in progress

      30 September 2023                                                                                    30 September 2023
                                                                          Oktober/October 2023 -
      Infrastruktur                  3% - 99%                  138,169        Juni/June 2025                      Infrastructure

                                                                       Desember/December 2023 -
      Jalan dan jembatan             5% - 95%                   22,828 Desember/December 2025               Roads and bridges

      Fasilitas peremukan dan                                           Oktober/October 2023 -                    Crushing and
        pengolahan                   65% - 98%                  12,538 Desember/December 2023               handling facilities

      Lain-lain                     0.6% - 99%                  12,804       Bervariasi/Various                          Others

      Total                                                    186,339                                                    Total
Page 89
                                        PT ADARO ENERGY INDONESIA Tbk
                                   DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                   Lampiran 5/77 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                    NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                          FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                      30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                                   (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                            unless otherwise stated)

10.   ASET TETAP (lanjutan)                                       10.      FIXED ASSETS (continued)

      Aset dalam pembangunan (lanjutan)                                    Construction in progress (continued)

      Aset dalam pembangunan merupakan proyek yang                         Construction in progress represents projects that
      belum selesai pada tanggal laporan posisi keuangan                   were not completed as at the date of the interim
      konsolidasian interim dengan rincian sebagai berikut:                consolidated statements of financial position as
      (lanjutan)                                                           follows: (continued)

                                     Persentase         Akumulasi                 Estimasi
                                    penyelesaian/         biaya/                penyelesaian/
               Aset dalam           Percentage of      Accumulated                Estimated                   Construction
              pembangunan            completion           costs                  completion                    in progress

      31 Desember 2022                                                                                           31 December 2022
                                                                            Januari/January 2023 -
      Infrastruktur                  0.01% - 99%                 16,650     Februari/February 2025                     Infrastructure

                                                                                 Mei/May -
      Fasilitas peremukan dan                                                Desember/December                         Crushing and
        pengolahan                    31% - 97%                   9,879            2023                          handling facilities

                                                                             Desember/December
      Jalan dan jembatan              1% - 75%                    8,446            2023                          Roads and bridges

      Lain-lain                       10% - 95%                  17,928        Bervariasi/Various                             Others

      Total                                                      52,903                                                        Total

      Sesuai dengan kebijakan akuntansi Grup, manajemen                    In accordance with the Group’s accounting policies,
      melakukan pengujian penurunan nilai atas aset non-                   management tests its non-financial assets (fixed
      keuangan (aset tetap, properti pertambangan dan aset                 assets, mining properties and certain other assets)
      lain-lain tertentu) bilamana terdapat kejadian atau                  for impairment whenever events or changes in
      perubahan keadaan yang mengindikasikan bahwa nilai                   circumstances indicate that the carrying amount
      tercatat aset tersebut tidak terpulihkan (Catatan 11 dan             may not be recoverable (Notes 11 and 12).
      12).

      Pada tanggal 30 September 2023 dan 31 Desember                      As at 30 September 2023 and 31 December 2022,
      2022, manajemen berpendapat bahwa tidak ada                         management believes that there are no indicators of
      indikasi penurunan nilai sehingga cadangan kerugian                 impairment, therefore the provision for impairment
      penyisihan penurunan nilai aset tetap cukup untuk                   losses is adequate to cover any potential losses from
      menutup kerugian penurunan nilai buku aset tetap.                   impairment of the carrying amounts of fixed assets.


11.   INVESTASI PADA VENTURA BERSAMA                             11.       INVESTMENTS IN JOINT VENTURES

                                           30 September           31 Desember/
                                               2023              December 2022

      Kestrel                                        714,989               672,017                                           Kestrel
      BPI                                            444,322               391,061                                              BPI
      TPI                                            126,864               136,149                                              TPI
      BEP                                             63,036                63,006                                             BEP
      KHN                                             59,036                57,949                                             KHN
      DTP                                              5,379                 1,343                                             DTP
      Lain-lain                                          483                   367                                           Others

                                                   1,414,109              1,321,892

      Dikurangi: cadangan kerugian                                                                  Less: allowance for impairment
        penurunan nilai atas investasi               (44,383)               (44,383)                      losses on investments

      Total, neto                                  1,369,726            1,277,509                                        Total, net
Page 90
                                      PT ADARO ENERGY INDONESIA Tbk
                                 DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/78 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                  30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                               (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                        unless otherwise stated)

11.   INVESTASI PADA VENTURA BERSAMA (lanjutan)              11.     INVESTMENTS IN JOINT VENTURES (continued)

      Pada tanggal 30 September 2023 dan 31 Desember                 As at 30 September 2023 and 31 December 2022,
      2022, ventura bersama yang dimiliki oleh Grup adalah           the joint ventures of the Group were as follows:
      sebagai berikut:

                                                              Persentase
                                                             kepemilikan/
            Nama entitas/            Kedudukan/               Percentage                   Kegiatan usaha/
            Name of entity            Domicile               of ownership                  Business activity

      Kestrel                Australia                         47.99%         Tambang batubara kokas/Coking coal mine
      BPI                    Indonesia                         34.00%         Pembangkitan tenaga listrik dan transmisi/
                                                                                 Electric power generation and
                                                                                 transmission
      TPI                    Indonesia                         65.00%         Pembangkitan tenaga listrik dan transmisi/
                                                                                 Electric power generation and
                                                                                 transmission
      BEP                    Indonesia                         18.50%         Investasi/Investments
      KHN                    Indonesia                         50.00%         Pembangkitan listrik tenaga air/
                                                                                 Hydroelectric power generation
      DTP                    Indonesia                         49.00%         Pengolahan air/Water treatment
      GTM                    Indonesia                         49.00%         Pengolahan air/Water treatment
      TCU                    Indonesia                         49.00%         Jasa pemeliharaan fasilitas terminal/
                                                                                 Terminal facility maintenance services

      TPI                                                           TPI

      Berdasarkan Akta Notaris No. 20 tanggal 14 Maret              Based on Notarial Deed No. 20 dated 14 March 2022
      2022 yang dibuat di hadapan Humberg Lie, S.H., S.E.,          made before Humberg Lie, S.H., S.E., M.Kn., the
      M.Kn., para pemegang saham TPI setuju untuk                   shareholders of TPI have decided to increase the
      meningkatkan, menempatkan, dan menyetor penuh                 authorised, issued and paid-up capital of TPI in
      modal dasar TPI secara proporsional sesuai dengan             proportion to each shareholder’s share ownership in
      kepemilikan saham masing-masing pemegang saham                TPI. Therefore, there is no change in the shareholder
      di TPI. Dengan demikian, tidak ada perubahan                  composition of TPI. In relation to the above decision,
      komposisi pemegang saham di TPI. Sehubungan                   in March 2022, AP made an additional investment in
      dengan keputusan tersebut di atas, pada bulan Maret           shares in TPI amounting to US$45,690.
      2022, AP telah melakukan penambahan investasi di
      TPI sebesar AS$45.690.

      Selama tahun 2023, Grup menerima dividen dari TPI             During 2023, the Group received dividends from TPI
      sebesar AS$18.525 (30 September 2022: AS$8.775).              of US$18,525 (30 September 2022: US$8,775).

      KHN                                                           KHN

      Pada tanggal 29 November 2022, MTE bersama PT                 On 29 November 2022, MTE together with PT Kayan
      Kayan Energi Internasional (“KEI”) mengakuisisi KHN           Energi Internasional (“KEI”) acquired KHN from
      dari Sarawak Energy Services Sdn. Bhd. dan PT                 Sarawak Energy Services Sdn. Bhd. and PT Kayan
      Kayan Investama Internasional dengan kepemilikan              Investama Internasional with shares ownership of
      saham masing-masing sebesar 50% dan 50%, untuk                50% and 50%, respectively, to develop Mentarang
      mengembangkan proyek Pembangkit Listrik Tenaga                Hydroelectric Power Plant in North Kalimantan.
      Air (“PLTA”) Mentarang di Kalimantan Utara.
Page 91
                                                                      PT ADARO ENERGY INDONESIA Tbk
                                                                 DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                                                                 Lampiran 5/79 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                                                        NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                                                              FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                                                                                          30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                                                                                                       (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                                                                                                unless otherwise stated)

11. INVESTASI PADA VENTURA BERSAMA (lanjutan)                                                                                 11. INVESTMENTS IN JOINT VENTURES (continued)

  Tabel dibawah ini menampilkan ringkasan informasi                                                                                 The table below provides a summary of the financial
  keuangan ventura bersama Grup, dimana semuanya                                                                                    information of the Group’s joint ventures, all of which are
  tidak diperdagangkan di bursa.                                                                                                    unlisted.
                                   Kestrel                                 BPI                        TPI                             DTP                            BEP                             KHN                          Lain-lain/Others
                                              31                                31                               31                              31                              31                              31                            31
                           30              Desember/           30            Desember/            30          Desember/           30          Desember/           30          Desember/           30          Desember/           30        Desember/
                       September           December        September         December         September       December        September       December        September       December        September       December        September     December
                         2023                2022            2023              2022             2023            2022            2023            2022            2023            2022            2023            2022            2023          2022

  Kas dan setara kas/
     Cash and cash
     equivalents              177,964         160,748         324,530             122,096         53,242          48,081            894             596             598            1,184          22,693          55,316             46           297
  Aset lancar/
     Current assets           368,990         362,222         679,885             511,299        102,163         109,555           2,107            973             604            1,192          22,700          55,318            338           297
  Aset tidak lancar/
     Non-current
     assets                 2,011,861        2,024,977       5,111,816           5,063,001       457,301         466,662          23,205          12,529          82,812          82,181          70,837          35,982           2,301          452
  Liabilitas keuangan
     jangka pendek
     (tidak termasuk
     utang usaha dan
     utang lain-lain)/
     Current financial
     liabilities (excluding
     trade and
     other payables)           89,772         156,657         269,822             260,973         43,150          33,647            213            4,449              1              31              85              34             416                 -
  Liabilitas jangka
     pendek/
     Current liabilities      131,002         182,290         379,703             316,806         48,759          38,242           1,212           5,453             88             232             213             148             442             1
  Liabilitas keuangan
     jangka panjang
     (tidak termasuk
     utang usaha dan
     utang lain-lain)/
     Non-current
     financial liabilities
     (excluding trade
     and other
     payables)                778,536         751,294        3,684,985           3,450,345       281,189         295,480          11,472           5,308            433             331                   -               -        1,213                -
  Liabilitas jangka
     panjang/
     Non-current
     liabilities              825,789         872,686        4,105,168           4,107,315       315,528         328,515          13,123           5,308            433             331                   -               -        1,213                -
  Kepentingan
     non-pengendali/
     Non-controlling
     interests                      -                  -               -                 -                -               -               -               -       (1,266)         (1,187)                 -               -        1,858                -
  Pendapatan/
     Revenue                  717,584        1,517,981        586,525             627,322         57,765          76,759           3,505          11,871                  -               -               -               -               -             -
  Penyusutan dan
     amortisasi/
     Depreciation and
     amortisation            (111,817)        (194,361)           (492)               (448)         (154)           (162)             (3)                 -               -               -               -               -           (1)               -
  Penghasilan
     keuangan/
     Finance income             7,695           4,533           3,761                 198           106                   -            7             16               9              12            1,477              6               1             5
  Biaya keuangan/
     Finance costs            (55,814)        (119,295)       (161,929)           (186,704)      (15,248)        (17,193)           (629)           (589)                 -           (2)                 -               -          (32)               -
  Laba/(rugi) sebelum
     pajak penghasilan/
     Profit/(loss)
     before income tax        126,926         508,528         105,084             134,773         14,729          17,544           1,722            983             107             (422)           999               (2)           271             (3)
  (Beban)/manfaat
     pajak penghasilan/
     Income tax
     (expense)/benefit        (35,089)        (153,387)        (34,416)            (36,163)       (3,682)         (7,271)           (699)                 -               -               -               -               -          (70)               -
  Laba/(rugi) periode/tahun
     berjalan/Profit/(loss)
     for the period/year       91,837         355,141          70,668              98,610         11,047          10,273           1,023            983             107             (422)           999               (2)           201             (3)
  Penghasilan/(kerugian)
     komprehensif lain
     periode/tahun berjalan/
     Other comprehensive
     income/(loss)
     for the period/year               -               -       85,983             358,727          3,170          29,615            (258)           (242)            57             (769)          1,173             (11)             5           (77)
  Total penghasilan
     komprehensif
     periode/tahun berjalan,
     setelah pajak/
     Total comprehensive
     income/(loss) for
     the period/year,
     net of tax                91,837         355,141         156,651             457,337         14,217          39,888            765             741             164           (1,191)          2,172             (13)           206           (80)
  Persentase
     kepemilikan (%)/
     Percentage of
     ownership (%)              47.99           47.99           34.00               34.00          65.00           65.00           49.00           49.00           18.50           18.50           50.00           50.00           49.00        49.00
Page 92
                                                                      PT ADARO ENERGY INDONESIA Tbk
                                                                 DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                                                                Lampiran 5/80 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                                                       NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                                                             FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                                                                                         30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                                                                                                      (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                                                                                               unless otherwise stated)

11. INVESTASI PADA VENTURA BERSAMA (lanjutan)                                                                                11. INVESTMENTS IN JOINT VENTURES (continued)

   Rekonsiliasi dari ringkasan informasi keuangan yang                                                                             The reconciliation of the summarised financial
   disajikan terhadap nilai buku dari kepentingan Grup                                                                             information presented to the carrying amount of the
   dalam ventura bersama adalah sebagai berikut:                                                                                   Group’s interests in the joint ventures is as follows:
                                    Kestrel                                BPI                       TPI                             DTP                            BEP                             KHN                          Lain-lain/Others
                                              31                                31                              31                              31                              31                              31                            31
                               30          Desember/           30            Desember/           30          Desember/           30          Desember/           30          Desember/           30          Desember/           30        Desember/
                           September       December        September         December        September       December        September       December        September       December        September       December        September     December
                             2023            2022            2023              2022            2023            2022            2023            2022            2023            2022            2023            2022            2023          2022

   Pada awal periode/
     tahun/At the
     beginning of the
     period/year             1,332,223        977,082        1,150,179            692,842       209,460         112,780           2,741           2,000          83,997          84,127          91,152                  -         748           828
   Penambahan/
     Additions                         -               -               -                 -            -          70,292           7,471                  -            -           1,061                  -       91,165             30                 -
   Dividen/Dividends                   -               -               -                 -      (28,500)        (13,500)              -                  -            -               -                  -            -              -                 -
   Laba/(rugi) periode/
     tahun berjalan/
     Profit/(loss) for
     the period/year           91,837         355,141          70,668              98,610        11,047          10,273           1,023            983             107             (422)           999               (2)           201             (3)
   Penghasilan/
     (kerugian)
     komprehensif
     lain periode/tahun
     berjalan/Other
     comprehensive
     income/(loss)
     for the period/year               -               -       85,983             358,727         3,170          29,615            (258)           (242)            57             (769)          1,173             (11)             5           (77)

   Pada akhir periode/
     tahun/At the end
     of the period/year      1,424,060       1,332,223       1,306,830           1,150,179      195,177         209,460          10,977           2,741          84,161          83,997          93,324          91,152            984           748

   Persentase
     kepemilikan (%)/
     Percentage of
     ownership (%)              47.99           47.99           34.00               34.00         65.00           65.00           49.00           49.00           18.50           18.50           50.00           50.00           49.00        49.00

                              683,406         639,334         444,322             391,061       126,864         136,149           5,379           1,343          15,569          15,539          46,663          45,576            483           367
   Properti
     pertambangan/
     Mining properties         19,580          20,680                  -                 -               -               -               -               -       47,467          47,467                  -               -               -             -
   Waran/Warrants              12,003          12,003                  -                 -               -               -               -               -            -               -                  -               -               -             -
   Aset tetap/
     Fixed assets                      -               -               -                 -               -               -               -               -               -               -       12,373          12,373                  -             -
   Penurunan nilai/
     Impairment                        -               -               -                 -               -               -               -               -      (44,383)        (44,383)                 -               -               -             -

   Nilai tercatat
     investasi pada
     ventura
     bersama/
     Carrying
     amount of
     investments in
     joint ventures           714,989         672,017         444,322             391,061       126,864         136,149           5,379           1,343          18,653          18,623          59,036          57,949            483           367


   Ventura bersama Grup merupakan perusahaan swasta                                                                                  The Group’s joint ventures are private companies and
   tertutup dan tidak terdapat harga pasar yang dikutip yang                                                                         there are no quoted market prices available for their
   tersedia untuk ventura bersama tersebut.                                                                                          shares.

   Untuk periode sembilan bulan yang berakhir pada                                                                                   For the nine-month periods ended 30 September 2023
   tanggal 30 September 2023 dan 2022, bagian atas                                                                                   and 2022, the share of other comprehensive income
   penghasilan komprehensif lain yang diakui Grup masing-                                                                            recognised by the Group amounted to US$31,768 and
   masing sebesar AS$31.768 dan AS$138.375,                                                                                          US$138,375, respectively, while the share in net profit
   sedangkan bagian atas keuntungan neto ventura                                                                                     of joint ventures recognised by the Group amounted to
   bersama yang diakui Grup masing-masing sebesar                                                                                    US$75,298 and US$221,120, respectively.
   AS$75.298 dan AS$221.120.

   Grup memiliki wakil dalam Direksi dan Komisaris pada                                                                              The Group has representation on the Boards of
   ventura bersama di atas.                                                                                                          Directors and Boards of Commissioners in the above
                                                                                                                                     joint ventures.

   Pada tanggal 29 September 2023, PT Bayu Energi Listrik                                                                            On September 29, 2023, PT Bayu Energi Listrik Lestari
   Lestari (“BELL”) didirikan dengan kepemilikan oleh AWE                                                                            (“BELL”) was established with shareholdings held by
   (40%) dan TotalEnergies Renewables Development Asia                                                                               AWE      (40%)   and     TotalEnergies  Renewables
   Pte. Ltd. (sebelumnya Eren Development Asia Pte. Ltd.)                                                                            Development Asia Pte. Ltd. (previously Eren
   (60%) sehubungan dengan pengembangan proyek                                                                                       Development Asia Pte. Ltd.) (60%) in relation to the
   Pembangkit Listrik Tenaga Bayu (“PLTB”) Tanah Laut 70                                                                             development of the Tanah Laut 70 MW Wind Farm with
   MW dengan Sistem Penyimpanan Energi Baterai                                                                                       Battery Energy Storage System 10 MW/MWh in Tanah
   10 MW/MWh di Tanah Laut, Kalimantan Selatan ("PLTB                                                                                Laut, South Kalimantan ("Tanah Laut Wind Farm").
   Tanah Laut”).
Page 93
                                       PT ADARO ENERGY INDONESIA Tbk
                                  DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                   Lampiran 5/81 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                 NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                       FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                   30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                                (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                         unless otherwise stated)

11.   INVESTASI PADA VENTURA BERSAMA (lanjutan)                 11.     INVESTMENTS IN JOINT VENTURES (continued)

      Manajemen Grup berpendapat bahwa tidak terdapat                   The Group’s management is of the opinion that there
      kejadian-kejadian atau perubahan keadaan yang                     are no events or changes of circumstances which
      mengindikasikan adanya bukti objektif penurunan nilai             indicate a permanent decline in the fair value of the
      wajar investasi, sehingga tidak diperlukan cadangan               investments. Therefore, no further provision for
      penurunan nilai atas investasi pada ventura bersama.              impairment in the value of investments in joint
      Pada tanggal 30 September 2023 dan 31 Desember                    ventures is necessary. As at 30 September 2023 and
      2022, manajemen berpendapat bahwa cadangan                        31 December 2022, management is of the opinion
      kerugian penyisihan penurunan nilai cukup untuk                   that the provision for impairment losses was
      menutupi adanya kerugian penurunan nilai buku                     adequate to cover any losses from the impairment of
      investasi pada ventura bersama.                                   the carrying amounts of investments in joint
                                                                        ventures.

12.   PROPERTI PERTAMBANGAN                                     12.     MINING PROPERTIES

                                                    30 September 2023
                                   Tambang             Tambang
                                     yang                dalam
                                 berproduksi/       pengembangan/
                                   Mines in           Mines under
                                  production         development            Total

      Harga perolehan                                                                                        Acquisition costs
      Saldo awal                     2,391,501              449,506            2,841,007                     Beginning balance
      Penambahan                         8,289                7,475               15,764                              Additions

      Saldo akhir                    2,399,790              456,981            2,856,771                        Ending balance

      Akumulasi amortisasi                                                                          Accumulated amortisation
      Saldo awal                     (1,659,578)                  -           (1,659,578)                  Beginning balance
      Amortisasi                        (43,527)                  -              (43,527)                        Amortisation

      Saldo akhir                    (1,703,105)                  -           (1,703,105)                       Ending balance

      Penyisihan atas kerugian
        penurunan nilai                 (81,199)            (66,972)            (148,171)        Provision for impairment losses

      Total nilai tercatat             615,486              390,009            1,005,495                Total carrying amount

                                                31 Desember/December 2022
                                   Tambang              Tambang
                                     yang                 dalam
                                 berproduksi/        pengembangan/
                                   Mines in            Mines under
                                  production          development         Total

      Harga perolehan                                                                                        Acquisition costs
      Saldo awal                     2,363,975              441,556            2,805,531                     Beginning balance
      Penambahan                        27,526                7,950               35,476                              Additions

      Saldo akhir                    2,391,501              449,506            2,841,007                        Ending balance

      Akumulasi amortisasi                                                                          Accumulated amortisation
      Saldo awal                     (1,439,876)                  -           (1,439,876)                  Beginning balance
      Amortisasi                       (219,702)                  -             (219,702)                        Amortisation

      Saldo akhir                    (1,659,578)                  -           (1,659,578)                       Ending balance

      Penyisihan atas kerugian
        penurunan nilai                 (81,199)            (66,972)            (148,171)        Provision for impairment losses

      Total nilai tercatat             650,724              382,534            1,033,258                Total carrying amount

      Seluruh     amortisasi  properti  pertambangan                    All amortisation of mining properties was allocated to
      dialokasikan ke beban pokok pendapatan (Catatan                   cost of revenue (Note 30).
      30).
Page 94
                                            PT ADARO ENERGY INDONESIA Tbk
                                       DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                     Lampiran 5/82 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                       NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                             FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                         30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                                      (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                               unless otherwise stated)

12.   PROPERTI PERTAMBANGAN (lanjutan)                                12.   MINING PROPERTIES (continued)

      Pada tanggal 30 September 2023 dan 31 Desember                         As at 30 September 2023 and 31 December 2022,
      2022, manajemen berpendapat bahwa tidak ada                           management is of the opinion that there are no
      indikasi penurunan nilai sehingga cadangan kerugian                   indicators of impairment, therefore the provision for
      penyisihan penurunan nilai properti pertambangan                      impairment losses is adequate to cover any potential
      cukup untuk menutupi kerugian penurunan nilai                         losses from impairment of the carrying amounts of
      properti pertambangan.                                                mining properties.

13.   GOODWILL                                                        13.   GOODWILL

                                                 30 September          31 Desember/
                                                     2023             December 2022

      Nilai tercatat                                   776,943               776,943                            Carrying amount

      Rincian goodwill berdasarkan lini usaha, sebagai                      Details of goodwill based on lines of business, are as
      berikut:                                                              follows:

                                                 Pertambangan
                                                       dan
                                                 perdagangan                Jasa
                                                 batubara/Coal         pertambangan/
                                                  mining and               Mining             Logistik/
                                                     trading              services            Logistics              Total

      30 September 2023 dan/and
        31 Desember/December 2022                       658,947                  39,665               78,331              776,943

      Sesuai dengan kebijakan akuntansi Grup, goodwill                      In accordance with the Group’s accounting policy,
      diuji penurunan nilainya secara tahunan dan ketika                    goodwill is tested for impairment annually and when
      terdapat suatu indikasi bahwa nilai tercatatnya                       the circumstances indicate the carrying amount may
      mengalami penurunan nilai (Catatan 2m). Untuk tujuan                  be impaired (Note 2m). For the purpose of assessing
      pengujian penurunan nilai, aset dikelompokkan hingga                  impairment, assets are grouped at the lowest level
      unit terkecil yang menghasilkan arus kas terpisah                     for which there are separately identifiable cash flows
      (UPK).                                                                (CGU).

      Pengujian penurunan nilai terakhir dilakukan pada                     The last impairment test was performed as at
      tanggal 31 Desember 2022. Grup menggunakan                            31 December 2022. The Group uses an income
      pendekatan pendapatan untuk menguji penurunan                         approach to assess the impairment value of certain
      nilai UPK tertentu. Pendekatan pendapatan                             CGUs. The income approach is predicated upon the
      didasarkan atas nilai arus kas masa depan yang akan                   value of the future cash flows that a business will
      dihasilkan oleh suatu bisnis. Metode DAK digunakan                    generate going forward. The DCF method was used,
      dengan      memproyeksikan       arus    kas     dan                  which involves projecting cash flows and converting
      mendiskontokannya menjadi nilai kini. Proses                          them to a present value equivalent through
      pendiskontoan menggunakan tingkat pengembalian                        discounting. The discounting process uses a rate of
      yang sesuai dengan risiko terkait dengan bisnis atau                  return that is commensurate with the risk associated
      aset dan nilai waktu uang.                                            with the business or asset and the time value of
                                                                            money.

      Asumsi utama yang digunakan dalam perhitungan                         The key assumptions used for recoverable amount
      jumlah terpulihkan pada tanggal 31 Desember 2022                      calculations as at 31 December 2022 were as
      adalah sebagai berikut:                                               follows:

                                                       Pertambangan dan                     Jasa
                                                     perdagangan batubara/             pertambangan/             Logistik/
                                                     Coal mining and trading           Mining services           Logistics

      Tingkat pertumbuhan setelah lima
        tahun/Growth rate after five years                       0%                          0%                      0%
      Tingkat diskonto setelah pajak (untuk
        perhitungan nilai wajar setelah
        dikurangi biaya untuk menjual)/
        Post-tax discount rate (for fair value
        less costs of disposal calculation)                 9.5% - 10.0%                    10.0%                   10.0%
Page 95
                                        PT ADARO ENERGY INDONESIA Tbk
                                   DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                  Lampiran 5/83 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                 NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                       FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                   30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                                (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                         unless otherwise stated)

13.   GOODWILL (lanjutan)                                         13.   GOODWILL (continued)

      Perhitungan ini menggunakan proyeksi arus kas                     These calculations use cash flow projections based
      berdasarkan anggaran keuangan yang disetujui oleh                 on financial budgets approved by the management.
      manajemen. Asumsi utama yang lain termasuk                        Other key assumptions include projected cash flows,
      proyeksi arus kas, harga batubara, estimasi cadangan              coal price, estimated coal reserves, inflation rate,
      batubara, tingkat inflasi, tingkat penjualan dan produksi         sales and production levels and cost structures.
      dan struktur biaya.

      Manajemen menentukan asumsi utama berdasarkan                     Management determined the key assumptions
      kombinasi pengalaman masa lalu dan sumber                         based on a combination of past experience and
      eksternal.                                                        external sources.

      Pada tanggal 31 Desember 2022, jumlah terpulihkan                 As at 31 December 2022, the recoverable amount of
      dari setiap UPK ditentukan berdasarkan perhitungan                the CGU was determined based on fair value less
      nilai wajar aset dikurangi biaya pelepasan yang                   cost of disposal calculations which requires the use
      membutuhkan penggunaan asumsi-asumsi. Teknik                      of assumptions. The valuation technique uses
      penilaian menggunakan input-input yang signifikan                 significant unobservable inputs, which represent a
      yang tidak dapat diobservasi, yang merupakan nilai                Level 3 fair value.
      wajar Tingkat 3.

      Pada tanggal 31 Desember 2022, salah satu                         As at 31 December 2022, one of the Group’s coal
      perusahaan       pertambangan      dan    perdagangan             mining and trading companies had the highest
      batubara Grup memiliki tingkat sensitivitas tertinggi             sensitivity to changes in key assumptions. The CGU
      atas perubahan asumsi utama. UPK tersebut memiliki                had an excess recoverable amount, calculated
      kelebihan jumlah terpulihkan, dihitung berdasarkan                based on the fair value less costs of disposal
      nilai wajar setelah dikurangi biaya untuk menjual, dari           method, over the carrying amount of US$151,955.
      nilai tercatat, sebesar AS$151.955. Kenaikan tingkat              A rise in the discount rate (with other assumptions
      diskonto (dengan asumsi lainnya tidak berubah)                    remaining unchanged) of 3.14% would remove the
      sebesar 3,14% akan menghapus kelebihan yang                       remaining headroom for the relevant CGU.
      tersisa dari UPK tersebut.

      Karena tidak terdapat indikator penurunan nilai UPK,              As there were no indicators of impairment for any of
      manajemen belum memperbaharui perhitungan                         the CGUs, management has not updated the
      penurunan nilai pada tanggal 30 September 2023.                   impairment assessments as at 30 September 2023.


14.   PINJAMAN UNTUK PIHAK KETIGA                                 14.   LOANS TO THIRD PARTIES

                                            30 September           31 Desember/
                                                2023              December 2022

      PT Kalimantan Industrial Park
        Indonesia (“KIPI”)                                                                    PT Kalimantan Industrial Park
        (Catatan 39y)                                140,357             129,310            Indonesia (“KIPI”) (Note 39y)
      PT Kawasan Industri Kalimantan
        Indonesia (“KIKI”)                                                                 PT Kawasan Industri Kalimantan
        (Catatan 39x)                                 14,644              19,983            Indonesia (“KIKI”) (Note 39x)
      Lain-lain                                       10,736              10,211                                     Others

      Total                                          165,737             159,504                                      Total

      Dikurangi: bagian lancar                       165,267             159,121                     Less: current portion

      Bagian tidak lancar                                470                 383                      Non-current portion
Page 96
                                      PT ADARO ENERGY INDONESIA Tbk
                                 DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/84 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                  FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                              30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                           (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                    unless otherwise stated)

14.   PINJAMAN UNTUK PIHAK KETIGA (lanjutan)                 14.   LOANS TO THIRD PARTIES (continued)

      Manajemen Grup berpendapat bahwa penurunan nilai             The Group’s management is of the opinion that the
      atas pinjaman untuk pihak ketiga pada tanggal                impairment of loans to third parties as at
      30 September 2023 dan 31 Desember 2022 tidak                 30 September 2023 and 31 December 2022 is not
      material, sehingga, cadangan kerugian kredit                 material. Therefore, the provision for ECL is not
      ekspektasian tidak diperlukan.                               considered necessary.

      Lihat Catatan 42(2) untuk informasi nilai wajar dari         Refer to Note 42(2) for information on the fair value
      pinjaman untuk pihak ketiga pada tanggal                     of loans to third parties as at 30 September 2023 and
      30 September 2023 dan 31 Desember 2022.                      31 December 2022.


15.   UTANG USAHA                                            15.   TRADE PAYABLES

                                         30 September         31 Desember/
                                             2023            December 2022

      Pihak ketiga                               418,016            333,212                                Third parties

      Saldo utang usaha terutama berasal dari pembelian            Trade payables balances mainly arose from the
      bahan bakar, suku cadang, jasa perbaikan dan                 purchase of fuel, spare parts, repair and
      pemeliharaan, jasa pengangkutan batubara, dan jasa           maintenance services, coal transportation services
      pertambangan batubara.                                       and coal mining services.

      Rincian utang usaha berdasarkan mata uang adalah             Details of trade payables based on currencies are as
      sebagai berikut:                                             follows:

                                         30 September         31 Desember/
                                             2023            December 2022

      Rupiah                                     389,215            292,086                                     Rupiah
      Dolar AS                                    28,795             41,101                                 US Dollars
      Dolar Singapura                                  4                 23                          Singapore Dollars
      Dolar Australia                                  2                  2                          Australian Dollars

      Total                                      418,016            333,212                                       Total


16.   UTANG ROYALTI                                          16.   ROYALTIES PAYABLE

                                         30 September         31 Desember/
                                             2023            December 2022

      Utang royalti kepada
       Pemerintah, neto                           31,386             49,511         Government royalties payable, net

      Utang royalti kepada Pemerintah merupakan subyek             Government royalties payable are subject to audit by
      audit oleh Direktorat Pembinaan Pengusahaan Mineral          the Directorate of Mineral and Coal Business
      dan Batubara, KESDM.                                         Supervision, the MoEMR.
Page 97
                                      PT ADARO ENERGY INDONESIA Tbk
                                 DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/85 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                  FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                              30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                           (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                    unless otherwise stated)

17.   BEBAN YANG MASIH HARUS DIBAYAR                         17.   ACCRUED EXPENSES

                                         30 September         31 Desember/
                                             2023            December 2022

      Cadangan untuk pembayaran
        penetapan Pemerintah                                                       Allowance for Government charges
        (Catatan 31 dan 39m)                      95,244             70,003                     (Notes 31 and 39m)
      Pemasok dan kontraktor                      90,859             59,138                Suppliers and contractors
      PNBP dan pendapatan
        pemerintah daerah                                                              PNBP and regional government
        (Catatan 31 dan 39o)                      70,562                  -             revenue (Notes 31 and 39o)
      Bunga                                       25,301             13,798                                 Interest
      Lain-lain                                   23,705             21,117                                  Others

      Total                                      305,671            164,056                                     Total


18.   LIABILITAS SEWA                                        18.    LEASE LIABILITIES

      Grup menandatangani beberapa perjanjian sewa yang             The Group entered into several lease agreements
      berkaitan dengan sewa gedung, mesin, peralatan                related to the rental of buildings, machineries,
      operasional, dan kendaraan. Perjanjian sewa biasanya          operational equipment and vehicles. Rental
      memiliki periode tetap dari satu sampai dengan                agreements are typically made for fixed periods of
      sembilan belas tahun. Ketentuan sewa dinegosiasikan           one to nineteen years. Lease terms are negotiated
      secara individu dan mengandung syarat dan ketentuan           on an individual basis and contain a wide range of
      yang berbeda.                                                 different terms and conditions.

                                         30 September         31 Desember/
                                             2023            December 2022

      PT Komatsu Astra Finance                    66,129             43,861               PT Komatsu Astra Finance
      PT Mitsui Leasing Capital                                                            PT Mitsui Leasing Capital
        Indonesia                                 12,470              9,786                              Indonesia
      PT Mizuho Leasing Indonesia                                                   PT Mizuho Leasing Indonesia Tbk
        Tbk (dahulu PT Verena                                                               (previously PT Verena
        Multi Finance Tbk)                           642              1,605                     Multi Finance Tbk)
      PT JACCS Mitra Pinasthika                                                           PT JACCS Mitra Pinasthika
        Mustika Finance Indonesia                      -              2,987             Mustika Finance Indonesia
      Lain-lain                                   13,643              9,411                                   Others

      Total                                       92,884             67,650                                      Total

      Dikurangi:                                                                                               Less:
      Bagian jangka pendek                        26,182             32,755                          Current portion

      Bagian jangka panjang                       66,702             34,895                      Non-current portion
Page 98
                                        PT ADARO ENERGY INDONESIA Tbk
                                   DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                 Lampiran 5/86 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                  NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                        FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                    30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                                 (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                          unless otherwise stated)

18.   LIABILITAS SEWA (lanjutan)                                 18.      LEASE LIABILITIES (continued)

      Laporan laba rugi dan penghasilan komprehensif lain                 The Group’s interim consolidated statements of
      konsolidasian interim Grup menyajikan saldo berikut                 profit or loss and other comprehensive income
      berkaitan dengan sewa:                                              show the following amounts related to leases:

                                                       30 September
                                                2023                   2022

      Beban terkait sewa jangka
       pendek (disajikan sebagai                                                      Expenses relating to short-term leases
       bagian dari beban pokok                                                               (presented as part of cost of
       pendapatan dan beban usaha)                   64,038               60,019        revenue and operating expenses)
      Beban terkait pembayaran sewa                                                      Expenses relating to variable lease
       variabel tidak termasuk dalam                                                            payments not included in
       kewajiban sewa                                49,507               29,545                           lease liabilities
      Beban bunga (disajikan sebagai                                                        Interest expense (presented as
       bagian dari biaya keuangan)                     3,880                  2,673                 part of finance costs)
      Beban terkait sewa aset
       bernilai rendah yang
       bukan merupakan sewa                                                                   Expenses relating to leases of
       jangka pendek (disajikan                                                              low-value assets that are not
       sebagai bagian dari beban                                                          short-term leases (presented as
       pokok pendapatan dan                                                                    part of cost of revenue and
       beban usaha)                                    1,353                   842                    operating expenses)

      Jumlah pengeluaran kas untuk sewa selama periode                    The total cash outflow for leases for the nine-month
      sembilan bulan yang berakhir pada tanggal                           periods ended 30 September 2023 and 2022 was
      30 September 2023 dan 2022 masing-masing adalah                     US$146,884 and US$133,751, respectively.
      sebesar AS$146.884 dan AS$133.751.

      Sehubungan dengan reformasi acuan suku bunga                        In relation to the floating interest rate benchmark
      mengambang, suku bunga USD London Interbank                         reform, the USD London Interbank Offered Rate
      Offered Rate (“LIBOR”) telah berhenti pada akhir Juni               (“LIBOR”) interest rate ceased at the end of June
      2023. Perjanjian sewa telah diubah untuk mengubah                   2023. Lease agreements have been amended to
      suku bunga dari LIBOR menjadi Secured Overnight                     change the interest rate from LIBOR to the
      Financing Rate (“SOFR”). Amandemen PSAK No. 71                      Secured Overnight Financing Rate (“SOFR”). The
      mensyaratkan Grup mengkaji keperluan dan                            amendment to SFAS No. 71 requires the Group to
      perubahan dasar untuk menentukan arus kas liabilitas                assess the need for a change in the basis for
      keuangan yang diukur pada biaya perolehan                           determining the cash flows of a financial liability
      diamortisasi, dengan memperbarui suku bunga efektif                 measured at amortised cost, by updating the
      berdasarkan      suku    bunga     acuan      alternatif            effective interest rates based on the alternative
      sebagaimana disyaratkan oleh standar. Berdasarkan                   benchmark rate as required by the standard.
      kajian manajemen, tidak ada dampak material atas                    Based on management’s assessment, there is no
      jumlah yang dilaporkan dalam laporan keuangan                       material impact on the amounts reported in the
      konsolidasian interim untuk periode berjalan.                       interim consolidated financial statements for the
                                                                          current period.
Page 99
                                       PT ADARO ENERGY INDONESIA Tbk
                                  DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                Lampiran 5/87 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                             (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                      unless otherwise stated)

19.   UTANG BANK                                               19.   BANK LOANS

                                            30 September        31 Desember/
                                                2023           December 2022

      Perjanjian Fasilitas AS$400.000,
        setelah dikurangi biaya                                                          US$400,000 Facility Agreement,
        keuangan yang belum                                                                net of unamortised financing
        diamortisasi sebesar AS$3.610                                                                 cost of US$3,610
        (31 Desember 2022: AS$4.658)               291,390            335,342          (31 December 2022: US$4,658)
      Perjanjian Fasilitas AS$350.000,
        setelah dikurangi biaya                                                          US$350,000 Facility Agreement,
        keuangan yang belum                                                                net of unamortised financing
        diamortisasi sebesar AS$7.961                                                                 cost of US$7,961
        (31 Desember 2022: AS$10.272)              221,539            211,728         (31 December 2022: US$10,272)
      Perjanjian Fasilitas AS$120.000,
        setelah dikurangi biaya                                                          US$120,000 Facility Agreement,
        keuangan yang belum                                                                net of unamortised financing
        diamortisasi sebesar AS$405                                                                    cost of US$405
        (31 Desember 2022: AS$883)                 119,595            119,117            (31 December 2022: US$883)
      Perjanjian Fasilitas AS$981.400 dan
        Rp1.547.900.000.000,                                                       US$981,400 and Rp1,547,900,000,000
        setelah dikurangi biaya                                                                    Facility Agreement,
        keuangan yang belum                                                               net of unamortised financing
        diamortisasi sebesar AS$11.131                                                              cost of US$11,131
        (31 Desember 2022: AS$nihil)                88,563                     -         (31 December 2022: US$nil)
      Perjanjian Fasilitas AS$80.000,
        setelah dikurangi biaya                                                            US$80,000 Facility Agreement,
        keuangan yang belum                                                                net of unamortised financing
        diamortisasi sebesar AS$579                                                                    cost of US$579
        (31 Desember 2022: AS$674)                  60,421             69,126            (31 December 2022: US$674)
      Perjanjian Fasilitas AS$603.600 dan
        Rp952.100.000.000,                                                          US$603,600 and Rp952,100,000,000
        setelah dikurangi biaya                                                                   Facility Agreement,
        keuangan yang belum                                                              net of unamortised financing
        diamortisasi sebesar AS$8.182                                                               cost of US$8,182
        (31 Desember 2022: AS$nihil)                41,720                  -            (31 December 2022: US$nil)
      Perjanjian Fasilitas AS$50.000                40,000             40,000             US$50,000 Facility Agreement
      Perjanjian Pinjaman Properti                                                           Commercial Property Loan
        Komersial                                    7,156               7,872                             Agreement
      Perjanjian Fasilitas
        Rp144.770.529.123                             658                      -   Rp144,770,529,123 Facility Agreement
      Perjanjian Fasilitas AS$100.000,
        setelah dikurangi biaya                                                          US$100,000 Facility Agreement,
        keuangan yang belum                                                                net of unamortised financing
        diamortisasi sebesar AS$nihil                                                                    cost of US$nil
        (31 Desember 2022: AS$336)                         -           27,664            (31 December 2022: US$336)

      Total                                        871,042            810,849                                      Total

      Dikurangi:                                                                                                  Less:
      Bagian jangka pendek                         260,808            142,945                           Current portion

      Bagian jangka panjang                        610,234            667,904                      Non-current portion
Page 100
                                     PT ADARO ENERGY INDONESIA Tbk
                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/88 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                  FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                              30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                           (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                    unless otherwise stated)

19.   UTANG BANK (lanjutan)                                  19.   BANK LOANS (continued)

      Tingkat suku bunga utang bank jangka panjang                 The interest rates on the long-term bank loans were
      tersebut adalah sebagai berikut:                             as follows:

                                        30 September          31 Desember/
                                            2023             December 2022

      Dolar AS                            4.2% - 8.6%         1.4% - 7.2%                                    US Dollars
      Dolar Singapura                     3.8% - 5.0%            3.8%                                  Singapore Dollars
      Rupiah                              8.5% - 8.8%              -                                             Rupiah

      a.    Perjanjian Fasilitas AS$400.000                        a.   US$400,000 Facility Agreement

            Pada tanggal 23 April 2021, AI mengadakan                   On 23 April 2021, AI entered into a Facility
            Perjanjian Pemberian Fasilitas Pinjaman                     Agreement of US$400,000 with a syndicate of
            sebesar AS$400.000 dengan sindikasi bank                    international and national banks, for which
            internasional dan nasional, yang dimana Bank                Bank Mandiri acts as the facility agent. The
            Mandiri bertindak sebagai agen fasilitas.                   Company acts as the guarantor of this loan
            Perusahaan bertindak sebagai penjamin atas                  facility. This loan facility was used to refinance
            fasilitas pinjaman ini. Fasilitas pinjaman ini              all amounts due under previous loan facility
            digunakan untuk membiayai kembali semua                     agreements.
            jumlah yang terutang berdasarkan perjanjian
            fasilitas sebelumnya.

            Fasilitas pinjaman ini akan jatuh tempo pada                This facility has a final maturity date of 23 April
            tanggal 23 April 2026 dan dibayarkan setiap                 2026 and is payable on a quarterly basis, bears
            kuartal, dikenakan bunga sebesar LIBOR                      interest at LIBOR plus a certain percentage,
            ditambah persentase tertentu, dan tidak diikat              and is not bound by any collateral.
            dengan jaminan apapun.

            Pada tanggal 21 Februari 2023, AI mengubah                  On 21 February 2023, AI amended the
            Perjanjian Fasilitas AS$400.000 untuk                       US$400,000 Facility Agreement to change the
            mengubah suku bunga dari LIBOR menjadi                      interest rate from LIBOR to SOFR, effective
            SOFR yang berlaku efektif pada tanggal                      from 27 April 2023.
            27 April 2023.

            Selama periode sembilan bulan yang berakhir                 During the nine-month period ended
            pada tanggal 30 September 2023, AI telah                    30 September 2023, AI has made instalment
            melakukan pembayaran cicilan sebesar                        payments amounting to US$45,000 (for the
            AS$45.000 (untuk periode sembilan bulan                     nine-month period ended 30 September 2022:
            yang berakhir pada tanggal 30 September                     US$37,500). As at 30 September 2023, the
            2022:     AS$37.500).       Pada     tanggal                outstanding balance of this loan facility was
            30 September 2023, saldo pinjaman yang                      US$295,000        (31   December         2022:
            terutang dari fasilitas pinjaman ini adalah                 US$340,000) and is repayable according to
            sebesar AS$295.000 (31 Desember 2022:                       the following schedule:
            AS$340.000) dan harus dibayarkan dengan
            jadwal pembayaran sebagai berikut:

                              Jadwal pembayaran kembali/                         Jumlah pembayaran
                                 Repayment schedule                                   kembali/
                                      (tahun/year)                               Repayment amount

                                           2023                                                   15,000
                                           2024                                                   60,000
                                           2025                                                   92,500
                                           2026                                                  127,500

                                           Total                                                 295,000
Page 101
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/89 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                 NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                       FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                   30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                                (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                         unless otherwise stated)

19.   UTANG BANK (lanjutan)                                   19.   BANK LOANS (continued)

      a.   Perjanjian Fasilitas AS$400.000 (lanjutan)                a.      US$400,000 Facility Agreement (continued)

           Sesuai dengan ketentuan dalam perjanjian                          In accordance with the loan agreement, AI is
           pinjaman, AI diharuskan untuk menjaga                             required to maintain certain financial ratios. AI
           beberapa rasio keuangan tertentu. AI juga                         is also required to comply with certain terms
           diharuskan untuk memenuhi beberapa                                and conditions with regard to its Articles of
           persyaratan    dan    ketentuan  mengenai                         Association, the nature of the business,
           Anggaran Dasar, kegiatan usaha, aksi                              corporate actions, financing activities and other
           korporasi, kegiatan pembiayaan dan lainnya.                       matters. As at 30 September 2023 and 31
           Pada tanggal 30 September 2023 dan                                December 2022, AI is in compliance with the
           31 Desember 2022, AI telah memenuhi rasio                         financial ratios and related terms and
           keuangan dan persyaratan dan ketentuan                            conditions.
           tersebut.

      b.   Perjanjian Fasilitas AS$350.000                          b.       US$350,000 Facilities Agreement

           Pada tanggal 29 Juli 2022, SIS mengadakan                         On 29 July 2022, SIS entered into a Facilities
           Perjanjian Fasilitas sebesar AS$350.000                           Agreement      of    US$350,000        (“Facilities
           (“Perjanjian Fasilitas”) dengan sindikasi bank                    Agreement”) with a syndicate of international
           internasional dan nasional yang di mana Bank                      and national banks, for which Bank Mandiri
           Mandiri bertindak sebagai agen fasilitas.                         acts as the facility agent. The Company acts
           Perusahaan bertindak sebagai penjamin atas                        as the guarantor of this loan facility. This loan
           fasilitas pinjaman ini. Fasilitas pinjaman ini                    facility consists of a term loan facility of
           terdiri dari fasilitas pinjaman berjangka                         US$150,000 and a revolving loan facility of
           sebesar AS$150.000 dan fasilitas pinjaman                         US$200,000 and both facilities will be due in
           revolving sebesar AS$200.000 dan kedua                            60 months from the date of the Facilities
           fasilitas tersebut memiliki jatuh tempo 60 bulan                  Agreement. The term loan facility is repayable
           sejak tanggal Perjanjian Fasilitas. Fasilitas                     on a quarterly basis with the first instalment
           pinjaman berjangka ini dibayarkan setiap                          due in January 2023. This facility bears interest
           kuartal dengan angsuran pertama pada bulan                        at SOFR plus a certain percentage.
           Januari 2023. Fasilitas ini dikenakan suku
           bunga sebesar SOFR ditambah persentase
           tertentu.

           Fasilitas pinjaman ini digunakan untuk                            This loan facility was used for loan refinancing
           membiayai kembali semua pinjaman yang                             to repay all outstanding loans due under the
           terutang berdasarkan perjanjian fasilitas                         previous facility agreement, transaction costs
           sebelumnya, membayar biaya transaksi dan                          and other expenses related to these facilities,
           biaya lain yang berhubungan dengan fasilitas                      other capital expenditures and general
           ini, pengeluaran modal dan keperluan                              corporate purposes.
           korporasi umum lainnya.

           Selama periode sembilan bulan yang berakhir                       During the nine-month period ended
           pada tanggal 30 September 2023, SIS telah                         30 September 2023, SIS has made instalment
           melakukan pembayaran cicilan sebesar                              payments of US$22,500 on the term loan
           AS$22.500 atas fasilitas pinjaman berjangka.                      facilities. As at 30 September 2023, the
           Pada tanggal 30 September 2023, saldo                             outstanding balance of this loan facility was
           pinjaman yang terutang dari fasilitas pinjaman                    US$127,500        (31   December         2022:
           ini adalah sebesar AS$127.500 (31 Desember                        US$150,000) and is repayable according to
           2022: AS$150.000) dan harus dibayarkan                            the following schedule:
           dengan jadwal pembayaran berikut:

                              Jadwal pembayaran kembali/                             Jumlah pembayaran
                                 Repayment schedule                                       kembali/
                                      (tahun/year)                                   Repayment amount

                                            2023                                                        7,500
                                            2024                                                       35,000
                                            2025                                                       40,000
                                            2026                                                       35,000
                                            2027                                                       10,000

                                            Total                                                     127,500
Page 102
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                             Lampiran 5/90 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                  30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                               (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                        unless otherwise stated)

19.   UTANG BANK (lanjutan)                                  19.   BANK LOANS (continued)

      b.   Perjanjian Fasilitas AS$350.000 (lanjutan)              b.       US$350,000          Facilities        Agreement
                                                                            (continued)

           Selama periode sembilan bulan yang berakhir                      During the nine-month period ended
           pada tanggal 30 September 2023, SIS                              30 September 2023, SIS made drawdowns of
           melakukan penarikan sebesar AS$55.000 dan                        US$55,000 and repayments of US$25,000 on
           pembayaran sebesar AS$25.000 atas fasilitas                      the revolving loan facility. As at 30 September
           pinjaman     revolving.     Pada     tanggal                     2023, the outstanding balance of this loan
           30 September 2023, saldo pinjaman yang                           facility was US$102,000 (31 December 2022:
           terutang dari fasilitas pinjaman ini adalah                      US$72,000).
           sebesar AS$102.000 (31 Desember 2022:
           AS$72.000).

           Sesuai dengan ketentuan dalam Perjanjian                         In accordance with the Facilities Agreement,
           Fasilitas, SIS diharuskan untuk menjaga                          SIS is required to maintain certain financial
           beberapa rasio keuangan tertentu. SIS juga                       ratios. SIS is also required to comply with
           diharuskan untuk memenuhi beberapa                               certain terms and conditions with regard to its
           persyaratan    dan    ketentuan  mengenai                        Articles of Association, the nature of the
           Anggaran Dasar, kegiatan usaha, aksi                             business,    corporate    actions,   financing
           korporasi, kegiatan pembiayaan dan lainnya.                      activities and other matters. As at
           Pada tanggal 30 September 2023 dan                               30 September 2023 and 31 December 2022,
           31 Desember 2022, SIS telah memenuhi rasio                       SIS is in compliance with the financial ratios
           keuangan dan persyaratan dan ketentuan                           and related terms and conditions
           tersebut.

      c.   Perjanjian Fasilitas AS$120.000                         c.       US$120,000 Facility Agreement

           Pada tanggal 18 Mei 2021, AP mengadakan                          On 18 May 2021, AP entered into a Credit
           Perjanjian    Fasilitas      Kredit     sebesar                  Facility Agreement of US$120,000 with a
           AS$120.000      dengan        sindikasi    bank                  syndicate of international and national banks
           internasional dan nasional, yang dimana                          for which Sumitomo Mitsui Banking
           Sumitomo Mitsui Banking Corporation,                             Corporation, Singapore Branch, acts as the
           Cabang Singapura, bertindak sebagai agen                         facility agent. The Company acts as the
           fasilitas. Perusahaan bertindak sebagai                          guarantor of this term loan facility.
           penjamin atas fasilitas pinjaman berjangka ini.

           Fasilitas pinjaman ini digunakan untuk                           This loan facility was used for repaying part of
           pembayaran kembali sebagian dari porsi                           the portion of BPI’s loan facility under the
           fasilitas pinjaman BPI berdasarkan Perjanjian                    US$817,027 Subordinated Term Loan Facility
           Subordinated Term Loan Facility AS$817.027                       Agreement guaranteed by the Company and
           yang dijamin oleh Perusahaan, serta                              paying transaction costs and expenses
           membayar biaya transaksi dan biaya lain yang                     associated with the facility. This facility shall be
           berhubungan dengan fasilitas ini. Fasilitas ini                  repaid in full on the final maturity date of 18
           harus dibayar kembali secara penuh pada                          May 2024. This facility bears interest at LIBOR
           tanggal jatuh tempo yaitu 18 Mei 2024.                           plus a certain percentage. This facility is not
           Fasilitas ini dikenakan bunga sebesar LIBOR                      bound by any collateral.
           ditambah persentase tertentu. Fasilitas ini
           tidak diikat dengan jaminan apapun.

           Pada tanggal 3 Juli 2023, AP menandatangani                      On 3 July 2023, AP signed an amended and
           perjanjian yang diubah dan dinyatakan                            restated agreement to the US$120,000 Facility
           kembali    terkait     Perjanjian  Fasilitas                     Agreement to change the interest rate from
           AS$120.000 untuk mengubah suku bunga dari                        LIBOR to SOFR.
           LIBOR menjadi SOFR.

           Pada tanggal 30 September 2023 dan                               As at 30 September 2023 and 31 December
           31 Desember 2022, saldo pinjaman yang                            2022, the outstanding balance of this loan
           terutang dari fasilitas pinjaman ini adalah                      facility was US$120,000.
           sebesar AS$120.000.
Page 103
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                             Lampiran 5/91 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                  30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                               (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                        unless otherwise stated)

19.   UTANG BANK (lanjutan)                                  19.   BANK LOANS (continued)

      c.   Perjanjian Fasilitas AS$120.000 (lanjutan)              c.       US$120,000 Facility Agreement (continued)

           Sesuai dengan ketentuan dalam perjanjian                         In accordance with the facility agreement, AP
           fasilitas, AP diharuskan untuk menjaga                           is required to maintain certain financial ratios.
           beberapa rasio keuangan tertentu. AP juga                        AP is also required to comply with certain
           diharuskan untuk memenuhi beberapa                               terms and conditions with regard to certain
           persyaratan dan ketentuan mengenai hal-hal                       matters regulated in its Articles of Association,
           tertentu yang diatur dalam Anggaran Dasar,                       the general nature of its business, corporate
           sifat umum kegiatan usaha, aksi korporasi,                       actions, financing activities and other matters.
           kegiatan pembiayaan dan lainnya. Pada                            As at 30 September 2023 and 31 December
           tanggal 30 September 2023 dan 31 Desember                        2022, AP is in compliance with the financial
           2022, AP telah memenuhi rasio keuangan dan                       ratios and related terms and conditions.
           persyaratan dan ketentuan tersebut.

      d.   Perjanjian Fasilitas AS$80.000                          d.       US$80,000 Facility Agreement

           Pada tanggal 6 Mei 2021, MSW mengadakan                          On 6 May 2021, MSW entered into a Credit
           Perjanjian Fasilitas Kredit sebesar AS$80.000                    Facility Agreement of US$80,000 with a
           dengan sindikasi bank nasional yang dimana                       syndicate of national banks for which Bank
           Bank Mandiri bertindak sebagai agen fasilitas.                   Mandiri acts as the facility agent. The
           Perusahaan bertindak sebagai penjamin atas                       Company acts as the guarantor of this term
           fasilitas pinjaman berjangka ini.                                loan facility.

           Fasilitas pinjaman ini wajib digunakan untuk                     This loan facility must be used for repayment
           membayar kembali jumlah pinjaman yang                            of the loan obtained from the Company, for
           diperoleh dari Perusahaan, membayar biaya                        paying transaction costs and expenses
           transaksi dan biaya lain yang berhubungan                        associated with the facility, payments of one-
           dengan perjanjian fasilitas ini, pembayaran                      time permitted dividends distribution to
           atas distribusi dividen yang diperbolehkan satu                  shareholders and to ensure the availability of
           kali terhadap pemegang saham serta                               an adequate DSRA balance in PT Bank
           memastikan tersedianya saldo DSRA yang                           Permata Tbk (Note 5). This facility has a final
           memadai di PT Bank Permata Tbk (Catatan 5).                      maturity date of 6 May 2028. This facility bears
           Fasilitas ini akan jatuh tempo pada tanggal                      interest at LIBOR plus a certain percentage.
           6 Mei 2028. Fasilitas ini dikenakan bunga                        This facility is not bound by any collateral.
           sebesar LIBOR ditambah persentase tertentu.
           Fasilitas ini tidak diikat dengan jaminan
           apapun.

           Pada tanggal 20 Juni 2023, MSW                                   On 20 June 2023, MSW signed an amended
           menandatangani perjanjian yang diubah dan                        and restated agreement to the US$80,000
           dinyatakan kembali terkait Perjanjian Fasilitas                  Facility Agreement to change the interest rate
           AS$80.000 untuk mengubah suku bunga dari                         from LIBOR to SOFR and changes to the
           LIBOR menjadi SOFR dan perubahan                                 covenants.
           kovenan.

           Selama periode sembilan bulan yang berakhir                      During the nine-month period ended
           pada tanggal 30 September 2023, MSW telah                        30 September 2023, MSW has made
           melakukan pembayaran cicilan sebesar                             instalment payments amounting to US$8,800
           AS$8.800 (untuk periode sembilan bulan yang                      (for   the    nine-month      period    ended
           berakhir pada tanggal 30 September 2022:                         30 September 2022: US$5,000). As at
           AS$5.000). Pada tanggal 30 September 2023,                       30 September 2023, the outstanding balance
           saldo pinjaman yang terutang dari fasilitas                      of this loan facility was US$61,000
           pinjaman ini adalah sebesar AS$61.000                            (31 December 2022: US$69,800) and is
           (31 Desember 2022: AS$69.800) dan harus                          repayable according to the following schedule:
           dibayarkan    kembali     dengan     jadwal
           pembayaran sebagai berikut:
Page 104
                                     PT ADARO ENERGY INDONESIA Tbk
                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/92 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                 NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                       FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                   30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                                (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                         unless otherwise stated)

19.   UTANG BANK (lanjutan)                                   19.   BANK LOANS (continued)

      d.   Perjanjian Fasilitas AS$80.000 (lanjutan)                d.       US$80,000 Facility Agreement (continued)

                              Jadwal pembayaran kembali/                             Jumlah pembayaran
                                 Repayment schedule                                       kembali/
                                      (tahun/year)                                   Repayment amount

                                            2023                                                        3,000
                                            2024                                                       12,400
                                            2025                                                       12,800
                                            2026                                                       13,200
                                            2027                                                       11,400
                                            2028                                                        8,200

                                            Total                                                      61,000

           Sesuai dengan ketentuan dalam perjanjian                          In accordance with the loan agreement, MSW
           pinjaman, MSW diharuskan untuk menjaga                            is required to maintain certain financial ratios.
           beberapa rasio keuangan tertentu. MSW juga                        MSW is also required to comply with certain
           diharuskan untuk memenuhi beberapa                                terms and conditions with regard to certain
           persyaratan dan ketentuan mengenai hal-hal                        matters regulated in its Articles of Association,
           tertentu yang diatur dalam Anggaran Dasar,                        as well as in implementing its line of business,
           serta dalam melaksanakan kegiatan usaha,                          corporate actions, financing activities and other
           aksi korporasi, kegiatan pembiayaan dan                           matters. As at 30 September 2023 and
           lainnya. Pada tanggal 30 September 2023 dan                       31 December 2022, MSW is in compliance with
           31 Desember 2022, MSW telah memenuhi                              the financial ratios and related terms and
           rasio keuangan dan persyaratan dan                                conditions.
           ketentuan tersebut.

      e.   Perjanjian Fasilitas AS$50.000                           e.       US$50,000 Facility Agreement

           Pada tanggal 5 Desember 2017, AIS                                 On 5 December 2017, AIS entered into an
           menandatangani Perjanjian Uncommitted                             Uncommitted Multi-Currency Revolving Term
           Multi-Currency Revolving Term Loan Facility                       Loan Facility Agreement of US$50,000 with
           sebesar AS$50.000 dengan DBS Bank Ltd.                            DBS Bank Ltd. As at 30 September 2022, the
           Pada tanggal 30 September 2022, fasilitas                         loan facility has been reduced to US$40,000.
           pinjaman ini telah diturunkan menjadi                             The Company acts as the guarantor for this
           AS$40.000. Perusahaan bertindak sebagai                           loan facility. This loan facility was used for
           penjamin atas fasilitas pinjaman ini. Fasilitas                   working capital. This loan facility bears interest
           pinjaman ini digunakan untuk membiayai                            at LIBOR plus a certain percentage.
           kebutuhan modal kerja. Fasilitas pinjaman ini
           dikenakan bunga sebesar LIBOR ditambah
           persentase tertentu.

           Selama periode sembilan bulan yang berakhir                       During the nine-month periods ended 30
           pada tanggal 30 September 2023 dan 2022,                          September 2023 and 2022, AIS did not make
           AIS tidak melakukan penarikan atau                                any drawdowns or repayments. As at 30
           pembayaran. Pada tanggal 30 September                             September 2023 and 31 December 2022, the
           2023 dan 31 Desember 2022, saldo pinjaman                         outstanding balance of this loan facility was
           yang terutang dari fasilitas pinjaman ini adalah                  US$40,000. This loan facility should be repaid
           sebesar AS$40.000. Fasilitas pinjaman ini                         on the last day of the interest period or on any
           akan dibayar kembali pada akhir periode                           other date as agreed by DBS Bank Ltd.
           bunga atau pada tanggal lain yang
           sebagaimana disepakati oleh DBS Bank Ltd.

           AIS harus memenuhi beberapa persyaratan                           AIS is required to comply with certain terms
           dan ketentuan yang ditetapkan dalam                               and conditions set out in this agreement. As at
           perjanjian ini. Pada tanggal 30 September                         30 September 2023 and 31 December 2022,
           2023 dan 31 Desember 2022, AIS telah                              AIS is in compliance with the related terms and
           memenuhi persyaratan dan ketentuan                                conditions.
           tersebut.

           Pada      tanggal  30   Juni   2023, AIS                          On 30 June 2023, AIS signed an amendment
           menandatangani surat perubahan untuk                              letter to change the interest rate applicable for
           mengubah suku bunga yang berlaku atas                             this loan facility from LIBOR to SOFR.
           fasilitas pinjaman ini dari LIBOR menjadi
           SOFR.
Page 105
                                     PT ADARO ENERGY INDONESIA Tbk
                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/93 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                 NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                       FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                   30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                                (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                         unless otherwise stated)

19.   UTANG BANK (lanjutan)                                   19.   BANK LOANS (continued)

      f.   Perjanjian Pinjaman Properti Komersial                   f.       Commercial Property Loan Agreement

           AIS memperoleh pinjaman properti komersial                        AIS obtained a commercial property loan of
           sebesar S$10.751.900 (nilai penuh) dari UOB                       S$10,751,900 (full amount) from UOB Bank
           Bank Limited Singapore sebagaimana                                Limited Singapore as set out in the letter of
           tercantum dalam surat penawaran tertanggal                        offer dated 10 October 2022. This loan facility
           10 Oktober 2022. Fasilitas pinjaman ini                           was used for the purchase of a commercial
           digunakan untuk pembelian properti komersial.                     property. The property is pledged for this
           Properti tersebut dijaminkan untuk fasilitas ini                  facility (Note 10). The loan bears interest at
           (Catatan 10). Pinjaman ini dikenakan bunga                        the Singapore Overnight Rate Average
           sebesar Singapore Overnight Rate Average                          (“SORA”) plus a certain percentage and has a
           (“SORA”) ditambah persentase tertentu dan                         final maturity date of ten years from the first
           memiliki jangka waktu sepuluh tahun sejak                         drawdown date.
           tanggal penarikan pertama.

           Pada tanggal 27 Oktober 2022, AIS telah                           On 27 October 2022, AIS has drawndown
           melakukan penarikan sebesar S$10.751.900                          S$10,751,900 (full amount) from the loan.
           (nilai penuh) dari pinjaman tersebut. Selama                      During the nine-month period ended
           periode sembilan bulan yang berakhir pada                         30 September 2023, AIS has made instalment
           tanggal 30 September 2023, AIS telah                              payments amounting to S$806,400 (full
           melakukan pembayaran cicilan sebesar                              amount) (equivalent to US$601). As at
           S$806.400 (nilai penuh) (setara dengan                            30 September 2023, the outstanding balance
           AS$601). Pada tanggal 30 September 2023,                          of this loan facility was S$9,766,300 (full
           saldo pinjaman yang terutang dari fasilitas ini                   amount)     (equivalent      to     US$7,156)
           adalah sebesar S$9.766.300 (nilai penuh)                          (31 December 2022: S$10,572,700 (full
           (setara dengan AS$7.156) (31 Desember                             amount) (equivalent to US$7,872)) and is
           2022: S$10.572.700 (nilai penuh) (setara                          repayable according to the following schedule:
           dengan AS$7.872)) dan dibayarkan dengan
           jadwal pembayaran sebagai berikut:

                              Jadwal pembayaran kembali/                             Jumlah pembayaran
                                 Repayment schedule                                       kembali/
                                      (tahun/year)                                   Repayment amount

                                            2023                                                        196
                                            2024                                                        788
                                            2025                                                        788
                                            2026                                                        788
                                            2027                                                        788
                                            2028                                                        788
                                            2029                                                        788
                                            2030                                                        788
                                            2031                                                        788
                                            2032                                                        656

                                            Total                                                     7,156

           AIS harus memenuhi beberapa persyaratan                           AIS is required to comply with certain terms
           dan ketentuan yang ditetapkan dalam Surat                         and conditions set out in the UOB Bank Limited
           Penawaran UOB Bank Limited Singapore.                             Singapore Letter of Offer. As at 30 September
           Pada tanggal 30 September 2023 dan                                2023 and 31 December 2022, AIS is in
           31 Desember 2022, AIS telah memenuhi                              compliance with the related terms and
           persyaratan dan ketentuan tersebut.                               conditions.

      g.   Perjanjian Fasilitas       AS$981.400      dan            g.      US$981,400     and      Rp1,547,900,000,000
           Rp1.547.900.000.000                                               Facility Agreement

           Pada 12 Mei 2023, KAI menandatangani                              On 12 May 2023, KAI entered into a Facility
           Perjanjian Fasilitas dengan sindikasi bank                        Agreement with a syndicate of national banks
           nasional yang dimana Bank Mandiri bertindak                       for which Bank Mandiri acts as the facility
           sebagai agen fasilitas (“Fasilitas Pinjaman                       agent (“KAI’s Loan Facility”).
           KAI”).
Page 106
                                     PT ADARO ENERGY INDONESIA Tbk
                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/94 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                   FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                               30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                            (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                     unless otherwise stated)

19.   UTANG BANK (lanjutan)                                   19.   BANK LOANS (continued)

      g.   Perjanjian Fasilitas AS$981.400            dan           g.   US$981,400     and    Rp1,547,900,000,000
           Rp1.547.900.000.000 (lanjutan)                                Facility Agreement (continued)

           Fasilitas Pinjaman KAI terdiri dari fasilitas                 KAI’s Loan Facility consists of term loan
           pinjaman berjangka dalam mata uang: (i) dolar                 facilities made available in: (i) US dollar, with a
           AS, dengan total komitmen sebesar                             total commitment of US$981,400 and an
           AS$981.400 dan tingkat suku bunga tahunan                     annual interest rate of SOFR plus a certain
           sebesar SOFR ditambah persentase tertentu                     percentage (“KAI’s Tranche A Loan Facility”);
           (“Fasilitas Pinjaman KAI Tranche A”); serta (ii)              and (ii) Rupiah, with a total commitment of
           Rupiah, dengan total komitmen sebesar                         IDR1,547,900,000,000 (full amount) and an
           Rp1.547.900.000.000 (nilai penuh) dan tingkat                 annual interest rate of Jakarta Interbank
           suku bunga tahunan sebesar Jakarta                            Offered Rate (“JIBOR”) plus a certain
           Interbank Offered Rate (“JIBOR”) ditambah                     percentage (“KAI’s Tranche B Loan Facility”).
           persentase tertentu ("Fasilitas Pinjaman KAI                  KAI’s Loan Facility will mature no later than 8
           Tranche B”). Fasilitas Pinjaman KAI ini akan                  (eight) years from the date of the signing of
           jatuh tempo paling lama 8 (delapan) tahun                     KAI’s Loan Facility.
           sejak tanggal penandatanganan Fasilitas
           Pinjaman KAI.

           Fasilitas Pinjaman KAI akan digunakan antara                  The KAI’s Loan Facility will be used for the
           lain untuk tujuan pembiayaan pengembangan                     purpose of, among others, financing the
           proyek smelter aluminium milik KAI yang                       development of an aluminium smelter project
           berlokasi     di  kawasan     industri yang                   owned by KAI, located in the industrial area,
           dikembangkan oleh KIPI, di Kalimantan Utara,                  developed by KIPI, in North Kalimantan,
           Indonesia.                                                    Indonesia.

           Terkait dengan Fasilitas Pinjaman KAI, AIA                    In relation to KAI’s Loan Facility, AIA will pledge
           akan memberikan jaminan gadai atas saham                      its shares in KAI, KAI will pledge its bank
           miliknya di KAI, KAI akan memberikan jaminan                  accounts, provide fiduciary security on its
           berupa jaminan gadai atas rekening bank,                      material fixed assets, fiduciary security on its
           jaminan fidusia atas aset tetap material milik                receivables, and mortgages over land located
           KAI, jaminan fidusia atas piutang yang diterima               in KAI’s project area, and the Company will
           oleh KAI, dan hak tanggungan atas tanah yang                  provide corporate guarantees in proportion to
           berlokasi di area proyek KAI, serta Perusahaan                AIA's ownership in KAI.
           akan memberikan jaminan perusahaan sesuai
           dengan kepemilikan AIA di KAI.

           Selama periode sembilan bulan yang berakhir                   During the nine-month period ended
           pada tanggal 30 September 2023, KAI                           30 September 2023, KAI made drawdowns of
           melakukan penarikan sebesar AS$90.500 atas                    US$90,500 on KAI’s tranche A loan facility and
           fasilitas pinjaman KAI Tranche A dan                          Rp142,740,000,000 (full amount) (equivalent
           Rp142.740.000.000 (nilai penuh) (setara                       to US$9,508) on KAI’s tranche B loan facility.
           dengan AS$9.508) atas fasilitas pinjaman KAI                  As at 30 September 2023, the outstanding
           Tranche B. Pada tanggal 30 September 2023,                    balance of these loan facility were US$90,500
           saldo pinjaman yang terutang dari fasilitas                   and    Rp142,740,000,000        (full amount)
           pinjaman ini adalah masing-masing sebesar                     (equivalent to US$9,194), respectively and is
           AS$90.500 dan Rp142.740.000.000 (nilai                        repayable according to the following schedule:
           penuh) (setara dengan AS$9.194) dan harus
           dibayarkan     kembali    dengan      jadwal
           pembayaran sebagai berikut:

                              Jadwal pembayaran kembali/                          Jumlah pembayaran
                                 Repayment schedule                                    kembali/
                                      (tahun/year)                                Repayment amount
                                            2026                                                    3,907
                                            2027                                                   15,220
                                            2028                                                   19,162
                                            2029                                                   20,645
                                            2030                                                   22,266
                                            2031                                                   18,494
                                            Total                                                  99,694
Page 107
                                     PT ADARO ENERGY INDONESIA Tbk
                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/95 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                   FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                               30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                            (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                     unless otherwise stated)

19.   UTANG BANK (lanjutan)                                   19.   BANK LOANS (continued)

      g.   Perjanjian Fasilitas AS$981.400            dan           g.   US$981,400     and    Rp1,547,900,000,000
           Rp1.547.900.000.000 (lanjutan)                                Facility Agreement (continued)

           Sesuai dengan ketentuan dalam Fasilitas                       In accordance with the KAI’s Loan Facility, KAI
           Pinjaman KAI, KAI diwajibkan untuk memenuhi                   is required to fulfill financial covenants
           kewajiban keuangan termasuk mematuhi                          including to comply with the terms and
           syarat dan ketentuan yang tercantum dalam                     conditions stated in the KAI’s Loan Facility.
           Fasilitas Pinjaman KAI. Pada tanggal                          As at 30 September 2023, KAI is in compliance
           30 September 2023, KAI telah memenuhi rasio                   with the financial ratios and related terms and
           keuangan dan persyaratan dan ketentuan                        conditions.
           tersebut.

      h.   Perjanjian Fasilitas       AS$603.600      dan           h.   US$603,600 and Rp952,100,000,000 Facility
           Rp952.100.000.000                                             Agreement

           Pada 12 Mei 2023, KPI menandatangani                          On 12 May 2023, KPI entered into a Facility
           Perjanjian Fasilitas dengan sindikasi bank                    Agreement with a syndicate of national banks
           nasional yang dimana Bank Mandiri bertindak                   for which Bank Mandiri acts as the facility agent
           sebagai agen fasilitas (“Fasilitas Pinjaman                   (“KPI’s Loan Facility”). KPI’s Loan Facility
           KPI”). Fasilitas Pinjaman KPI terdiri dari                    consists of term loan facilities made available
           fasilitas pinjaman berjangka dalam mata uang:                 in: (i) US dollars, with a total commitment of
           (i) dolar AS, dengan total komitmen sebesar                   US$603,600 and an annual interest rate of
           AS$603.600 dan tingkat suku bunga tahunan                     SOFR plus a certain percentage ("KPI’s
           sebesar SOFR ditambah persentase tertentu                     Tranche A Loan Facility”); and (ii) Rupiah, with
           ("Fasilitas Pinjaman KPI Tranche A”); serta (ii)              a total commitment of IDR952,100,000.000
           Rupiah, dengan total komitmen sebesar                         (full amount) and an annual interest rate of
           Rp952.100.000.000 (nilai penuh) dan tingkat                   JIBOR plus a certain percentage (“KPI’s
           suku bunga tahunan sebesar JIBOR ditambah                     Tranche B Loan Facility”). KPI’s Loan facility
           persentase tertentu (“Fasilitas Pinjaman KPI                  will mature no later than 10 (ten) years from the
           Tranche B”). Fasilitas Pinjaman KPI ini akan                  signing of KPI’s Loan Facility.
           jatuh tempo paling lama 10 (sepuluh) tahun
           sejak tanggal penandatanganan Fasilitas
           Pinjaman KPI.

           Fasilitas Pinjaman KPI akan digunakan antara                  KPI’s Loan Facility will be used among others,
           lain untuk tujuan pembiayaan pengembangan                     for the purpose of financing the development of
           proyek pembangkit listrik milik KPI yang                      a power plant project owned by KPI located in
           berlokasi     di  kawasan     industri yang                   an industrial area developed by KIPI, in North
           dikembangkan oleh KIPI, di Kalimantan Utara,                  Kalimantan, Indonesia.
           Indonesia.

           Terkait dengan Fasilitas Pinjaman KPI, AP                     In relation to KPI’s Loan Facility, AP will pledge
           akan memberikan jaminan gadai atas saham                      its shares in KPI, KPI will pledge its bank
           miliknya di KPI, KPI akan memberikan jaminan                  accounts, provide fiduciary security on its
           berupa jaminan gadai atas rekening bank,                      material fixed assets, fiduciary security on its
           jaminan fidusia atas aset tetap material milik                receivables, and mortgage on the land located
           KPI, jaminan fidusia atas piutang yang diterima               in the area of KPI’s project, and the Company
           oleh KPI, dan hak tanggungan atas tanah yang                  will provide a corporate guarantee in proportion
           berlokasi di area proyek KPI, serta Perusahaan                to AP’s ownership in KPI.
           akan memberikan jaminan perusahaan sesuai
           dengan kepemilikan AP di KPI.
Page 108
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                            Lampiran 5/96 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                             (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                      unless otherwise stated)

19.   UTANG BANK (lanjutan)                                19.   BANK LOANS (continued)

       h.   Perjanjian Fasilitas AS$603.600        dan            h.      US$603,600 and Rp952,100,000,000 Facility
            Rp952.100.000.000 (lanjutan)                                  Agreement (continued)

            Selama periode sembilan bulan yang berakhir                   During the nine-month period ended
            pada tanggal 30 September 2023, KPI                           30 September 2023, KPI made drawdowns of
            melakukan penarikan sebesar AS$45.300 atas                    US$45,300 on KPI’s tranche A loan facility and
            fasilitas pinjaman KPI Tranche A dan                          Rp71,455,000,000 (full amount) (equivalent to
            Rp71.455.000.000 (nilai penuh) (setara                        US$4,760) on KPI’s tranche B loan facility. As
            dengan AS$4.760) atas fasilitas pinjaman KPI                  at 30 September 2023, the outstanding
            Tranche B. Pada tanggal 30 September 2023,                    balance of these loan facility were US$45,300
            saldo pinjaman yang terutang dari fasilitas                   and     Rp71,455,000,000        (full amount)
            pinjaman ini adalah masing-masing sebesar                     (equivalent to US$4,602), respectively and is
            AS$45.300 dan Rp71.455.000.000 (nilai                         repayable according to the following schedule:
            penuh) (setara dengan AS$4.602) dan harus
            dibayarkan     kembali    dengan      jadwal
            pembayaran sebagai berikut:

                              Jadwal pembayaran kembali/                          Jumlah pembayaran
                                 Repayment schedule                                    kembali/
                                      (tahun/year)                                Repayment amount

                                          2026                                                      2,774
                                          2027                                                      5,864
                                          2028                                                      6,232
                                          2029                                                      6,636
                                          2030                                                      7,051
                                          2031                                                      7,458
                                          2032                                                      7,800
                                          2033                                                      6,087

                                          Total                                                   49,902

            Sesuai dengan ketentuan dalam Fasilitas                       In accordance with the KPI’s Loan Facility, KPI
            Pinjaman KPI, KPI diwajibkan untuk memenuhi                   is required     to fulfill financial covenants
            kewajiban keuangan termasuk        mematuhi                   including to comply with the terms and
            syarat dan ketentuan yang tercantum dalam                     conditions stated in KPI’s Loan Facility. As at
            Fasilitas Pinjaman KPI. Pada tanggal                          30 September 2023, KPI is in compliance with
            30 September 2023, KPI telah memenuhi rasio                   the financial ratios and related terms and
            keuangan dan persyaratan dan ketentuan                        conditions.
            tersebut.

      i.    Perjanjian Kredit Rp144.770.529.123                  i.       Rp144,770,529,123 Credit Agreement

            Pada      tanggal    25 Mei   2023,    ATB                    On 25 May 2023, ATB entered into a Credit
            menandatangani Perjanjian Kredit sebesar                      Agreement of Rp144,770,529,123 (full
            Rp144.770.529.123 (nilai penuh) dengan PT                     amount) with PT Bank Central Asia Tbk which
            Bank Central Asia Tbk dimana fasilitas                        includes a Bank Guarantee facility of
            pinjaman ini termasuk di dalamnya fasilitas                   Rp7,500,000,000 (full amount). APM acts as a
            Bank Garansi sebesar Rp7.500.000.000 (nilai                   guarantor for this loan facility.
            penuh). APM bertindak sebagai penjamin atas
            fasilitas pinjaman ini.
Page 109
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                             Lampiran 5/97 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                  30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                               (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                        unless otherwise stated)

19.   UTANG BANK (lanjutan)                                  19.   BANK LOANS (continued)

      i.   Perjanjian     Kredit     Rp144.770.529.123             i.       Rp144,770,529,123        Credit    Agreement
           (lanjutan)                                                       (continued)

           Fasilitas pinjaman ini digunakan untuk                           This loan facility is utilised to finance the
           membiayai proyek SPAM Brayan Kota Medan                          Brayan Medan City SPAM project with a
           dengan kapasitas 500 Liter per Detik. Fasilitas                  capacity of 500 Litres per Second. This loan
           pinjaman ini dikenakan suku bunga sebesar                        facility is subject to an interest rate of JIBOR
           JIBOR ditambah persentase tertentu per tahun                     plus a certain percentage per annum and will
           dan akan jatuh tempo dalam jangka waktu                          mature within a period of eleven years from the
           sebelas tahun sejak tanggal dilakukannya                         date of the first loan drawdown of the loan
           pencairan pertama atas fasilitas pinjaman.                       facility.

           Pinjaman ini dijamin dengan jaminan berupa                       The loan is secured with pledges of ATM’s and
           gadai saham ATM dan ATS di ATB, gadai atas                       ATS’ shares in ATB, pledge of ATB’s bank
           rekening bank ATB, jaminan fidusia atas hasil                    accounts, fiduciary security of the proceeds of
           klaim asuransi, jaminan fidusia atas bank                        insurance claims, fiduciary security of bank
           garansi, jaminan fidusia atas hak tagih                          guarantee, fiduciary security of right to claim
           Perjanjian Kerja Sama (“PKS”) dengan                             the Cooperation Agreement ("PKS") with
           Perusahaan Umum Daerah Tirtanadi, jaminan                        Perusahaan Umum Daerah Tirtanadi, fiduciary
           fidusia atas mesin dan peralatan, jaminan                        security of machineries and equipment,
                                                                            fiduciary security of receivables and mortgages
           fidusia atas piutang dan hak tanggungan atas
                                                                            over ATB’s land which designated as the
           tanah ATB yang akan digunakan sebagai area
                                                                            project area.
           proyek.
           Selama periode sembilan bulan yang berakhir                      During the nine-month period ended
           pada tanggal 30 September 2023, ATB                              30 September 2023, ATB made drawdowns of
           melakukan         penarikan         sebesar                      Rp10,209,769,249 (full amount) (equivalent to
           Rp10.209.769.249 (nilai penuh) (setara                           US$666) on the term loan facility. As at
           dengan AS$666)      atas fasilitas pinjaman                      30 September 2023, the outstanding balance
           berjangka. Pada tanggal 30 September 2023,                       of this loan facility was Rp10,209,769,249 (full
           saldo pinjaman yang terutang dari fasilitas                      amount) (equivalent to US$658) and is
           pinjaman      ini      adalah       sebesar                      repayable according to the following schedule:
           Rp10.209.769.249 (nilai penuh) (setara
           dengan AS$658) dan harus dibayarkan
           kembali dengan jadwal pembayaran sebagai
           berikut:

                              Jadwal pembayaran kembali/                            Jumlah pembayaran
                                 Repayment schedule                                      kembali/
                                      (tahun/year)                                  Repayment amount

                                           2025                                                            3
                                           2026                                                           23
                                           2027                                                           55
                                           2028                                                           65
                                           2029                                                           74
                                           2030                                                           81
                                           2031                                                           90
                                           2032                                                           94
                                           2033                                                           99
                                           2034                                                           74

                                           Total                                                        658

           Fasilitas pinjaman ini mensyaratkan ATB untuk                     This loan facility requires ATB to maintain
           menjaga rasio keuangan tertentu dan                               certain financial ratios and comply with
           memenuhi beberapa syarat dan ketentuan                            several terms and conditions stated in the
           yang tercantum dalam Perjanjian Kredit. Pada                      Credit Agreement. As at 30 September 2023,
           tanggal 30 September 2023, ATB telah                              ATB is in compliance with the financial ratios
           memenuhi rasio keuangan dan persyaratan                           and related terms and conditions.
           dan ketentuan tersebut.
Page 110
                                   PT ADARO ENERGY INDONESIA Tbk
                              DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                             Lampiran 5/98 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                             (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                      unless otherwise stated)

19.   UTANG BANK (lanjutan)                                19.   BANK LOANS (continued)

      j.   Perjanjian Fasilitas AS$100.000                       j.       US$100,000 Facility Agreement

           Pada tanggal 26 Juli 2021, PCS, SCM dan                        On 26 July 2021, PCS, SCM and LSA entered
           LSA mengadakan Perjanjian Pinjaman                             into a Syndicated Loan Agreement of
           Sindikasi sebesar AS$100.000 dengan                            US$100,000 with a syndicate of national
           sindikasi bank nasional, yang mana PT Bank                     banks, for which PT Bank Permata Tbk acts as
           Permata Tbk bertindak sebagai agen fasilitas                   the   facility   agent     (“Syndicated Loan
           (“Perjanjian Pinjaman Sindikasi”). Perusahaan                  Agreement”). The Company acts as the
           bertindak sebagai penjamin atas fasilitas                      guarantor for this loan facility.
           pinjaman ini.

           Fasilitas pinjaman ini terdiri dari fasilitas                  This facility consists of an amortising term loan
           pinjaman amortisasi berjangka sebesar                          facility of US$40,000 and a revolving credit
           AS$40.000 dan fasilitas pinjaman revolving                     facility of US$60,000 with a final maturity date
           sebesar AS$60.000 yang akan jatuh tempo                        of 26 July 2026 and is payable on a quarterly
           pada tanggal 26 Juli 2026 dan dibayarkan                       basis. This facility bears interest at LIBOR plus
           setiap kuartal. Fasilitas ini dikenakan bunga                  a certain percentage. These facilities are not
           sebesar LIBOR ditambah persentase tertentu.                    bound by any collateral.
           Fasilitas ini tidak terikat dengan jaminan
           apapun.

           Fasilitas pinjaman ini akan digunakan untuk                    These loan facilities will be used for repayment
           membayar kembali pinjaman yang diterima                        of loans obtained from their shareholders,
           dari para pemegang sahamnya, membayar                          paying transaction costs and expenses
           biaya transaksi dan biaya lain yang                            associated with the Syndicated Loan
           berhubungan dengan Perjanjian Pinjaman                         Agreement and for other general corporate
           Sindikasi ini dan untuk tujuan korporasi umum                  purposes.
           lainnya.

           PCS telah melakukan penarikan penuh pada                       PCS has made full drawdown on the amortising
           fasilitas pinjaman amortisasi berjangka                        term loan facility. During the nine-month period
           tersebut. Selama periode sembilan bulan yang                   ended 30 September 2022, PCS made
           berakhir pada tanggal 30 September 2022,                       instalment payments amounting to US$7,000.
           PCS telah melakukan pembayaran cicilan                         On 26 January 2023, PCS has fully repaid the
           sebesar AS$7.000. Pada tanggal 26 Januari                      amortising term loan facility. Therefore,
           2023, PCS telah melakukan pelunasan atas                       pursuant to the terms and conditions under the
           fasilitas pinjaman amortisasi berjangka.                       Syndicated Loan Agreement, the amortising
           Dengan demikian, berdasarkan syarat dan                        term loan facility is no longer able to be
           ketentuan     dalam    Perjanjian  Pinjaman                    withdrawn or re-borrowed, but the revolving
           Sindikasi, fasilitas pinjaman amortisasi                       credit facility still remains. As at 30 September
           berjangka tidak dapat ditarik kembali atau                     2023, the outstanding balance of this loan
           dipinjam kembali, namun fasilitas pinjaman                     facility was US$nil (31 December 2022:
           revolving tetap berlaku. Pada tanggal                          US$28,000).
           30 September 2023, saldo pinjaman yang
           terutang dari fasilitas pinjaman ini adalah
           sebesar AS$nihil (31 Desember 2022:
           AS$28.000).

           Pada 16 Mei 2023, SCM, PCS dan LSA                             On 16 May 2023, SCM, PCS and LSA
           melakukan perubahan Perjanjian Pinjaman                        amended the US$100,000 Syndicated Loan
           Sindikasi AS$100.000 untuk mengubah suku                       Agreement to change the interest rate from
           bunga dari LIBOR menjadi SOFR.                                 LIBOR to SOFR.
Page 111
                                      PT ADARO ENERGY INDONESIA Tbk
                                 DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/99 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                  30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                               (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                        unless otherwise stated)

19.    UTANG BANK (lanjutan)                                 19.   BANK LOANS (continued)

       j.    Perjanjian Fasilitas AS$100.000 (lanjutan)            j.       US$100,000 Facility Agreement (continued)

             Sesuai dengan ketentuan dalam Perjanjian                       In accordance with the Syndicated Loan
             Pinjaman Sindikasi, PCS, SCM dan LSA                           Agreement, PCS, SCM and LSA are required
             diharuskan untuk menjaga beberapa rasio                        to maintain certain financial ratios. PCS, SCM
             keuangan tertentu. PCS, SCM dan LSA juga                       and LSA are also required to comply with
             diharuskan untuk memenuhi beberapa                             certain terms and conditions with regard to
             persyaratan dan ketentuan mengenai syarat                      conditions precedent, business activities,
             pendahuluan,    kegiatan    usaha,  tujuan                     purpose of the loan and other matters. As at
             penggunaan pinjaman dan lainnya. Pada                          31 December 2022, PCS, SCM and LSA are
             tanggal 31 Desember 2022, PCS, SCM dan                         in compliance with the financial ratios and
             LSA telah memenuhi rasio keuangan dan                          related terms and conditions.
             persyaratan dan ketentuan tersebut.

      Sehubungan dengan reformasi acuan suku bunga                 In relation to the floating interest rate benchmark
      mengambang, suku bunga USD LIBOR telah berhenti              reform, the USD LIBOR interest rate ceased at the
      pada akhir Juni 2023. Perjanjian fasilitas pinjaman          end of June 2023. Bank loan facility agreements have
      bank telah diamandemen untuk mengubah suku bunga             been amended to change the interest rate from
      dari LIBOR menjadi SOFR dan berdasarkan kajian               LIBOR to SOFR and based on management’s
      manajemen terhadap perubahan acuan suku bunga                assessment of the changes in the loan interest rate
      pinjaman, tidak ada dampak material atas jumlah yang         benchmark, there is no material impact on the
      dilaporkan dalam laporan keuangan konsolidasian              amounts reported in the interim consolidated financial
      interim periode berjalan.                                    statements for the current period.


20.    SENIOR NOTES                                          20.   SENIOR NOTES

                                         30 September         31 Desember/
                                             2023            December 2022

       Nilai muka                                750,000                750,000                               Face value
       Pembelian dari pasar terbuka              (49,957)               (42,927)          Purchase from the open market
       Diskonto dan biaya penerbitan             (15,975)               (16,028)              Discount and issuance cost
       Amortisasi diskonto dan biaya                                                       Amortisation of discounts and
          penerbitan                              12,288                  9,845                        issuance costs

       Total, neto                               696,356                700,890                                Total, net

       Pada tanggal 31 Oktober 2019, AI menerbitkan                On 31 October 2019, AI issued Guaranteed Senior
       Guaranteed Senior Notes (“Senior Notes”) sebesar            Notes (the “Senior Notes”) amounting to
       AS$750.000, dengan harga penerbitan 98,892%.                US$750,000, with the issue price of 98.892%. The
       Senior Notes akan jatuh tempo pada tahun 2024               Senior Notes will mature in 2024 and bear a fixed
       dengan menanggung tingkat suku bunga tetap 4,25%            interest rate of 4.25%, which is payable semi-annually
       yang dibayarkan secara semi-annual pada tanggal             in arrears on 30 April and 31 October of each year,
       30 April dan 31 Oktober setiap tahun, yang dimulai          commencing on 30 April 2020. The Senior Notes are
       pada tanggal 30 April 2020. Senior Notes tersebut           unconditionally and irrevocably guaranteed by the
       dijamin oleh Perusahaan, tanpa syarat dan tidak             Company.
       dapat dibatalkan.
Page 112
                                      PT ADARO ENERGY INDONESIA Tbk
                                 DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/100 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                 30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                              (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                       unless otherwise stated)

20.   SENIOR NOTES (lanjutan)                                  20.   SENIOR NOTES (continued)

      Senior Notes tersebut diterbitkan berdasarkan                  The Senior Notes were issued under an indenture
      perjanjian antara AI, Perusahaan, dan The Bank of              between AI, the Company and The Bank of New York
      New York Mellon, sebagai wali amanat.                          Mellon, as the trustee.

      Senior Notes per tanggal 30 September 2023 dan 31              The Senior Notes as at 30 September 2023 and 31
      Desember 2022 mendapatkan peringkat “BBB-” dari                December 2022 are rated “BBB-” by Fitch and “Ba1”
      Fitch dan “Ba1” dari Moody’s, keduanya dengan                  by Moody’s, both with stable outlooks. The ratings
      prospek yang stabil. Peringkat tersebut menunjukkan            reflect the rating agencies’ assessments that AI and
      penilaian agen pemeringkat bahwa AI dan                        the Company will effectively execute its growth
      Perusahaan akan secara efektif menjalankan strategi            strategy while continuing to adhere to conservative
      pertumbuhan sambil terus mematuhi kebijakan                    financial policies.
      keuangan yang konservatif.

      Hasil dari Senior Notes digunakan untuk pembayaran             The net proceeds of the Senior Notes were used to
      sebagian saldo utang bank AI ketika jatuh tempo                repay a portion of AI’s existing bank loans when they
      sesuai dengan jadwal amortisasinya, untuk                      fell due under their existing amortisation schedules,
      pembayaran utang tambahan, tujuan umum                         for additional debt repayment, general corporate
      perusahaan dan pengeluaran modal Grup.                         purposes and capital expenditures of the Group.

      Senior Notes dan Jaminan atas Senior Notes tidak               The Senior Notes and the Guarantee of the Senior
      dijamin dan peringkatnya sejajar dengan semua                  Notes are unsecured and rank equally with all existing
      pinjaman senior AI dan Perusahaan yang tidak                   and future unsecured senior debt of AI and the
      dijamin, baik yang telah ada maupun yang akan                  Company, respectively. The Senior Notes and the
      diterima dikemudian hari. Senior Notes dan Jaminan             Guarantee will, respectively, be effectively
      atas Senior Notes masing-masing disubordinasikan               subordinated to all of AI and the Company’s existing
      secara efektif atas semua pinjaman dari AI dan                 and future secured debt to the extent of the assets
      Perusahaan yang memiliki jaminan aset, baik yang               securing such debt. The guarantee will be structurally
      telah ada maupun yang akan diterima, sebesar aset              subordinated to all liabilities (including trade
      yang dijaminkan terhadap pinjaman tersebut.                    payables) of all of the Company’s subsidiaries (other
      Jaminan      tersebut  akan      secara     struktural         than AI), which are not initially issuing guarantees.
      disubordinasikan terhadap semua liabilitas (termasuk
      utang usaha) dari semua entitas anak Perusahaan
      lainnya (selain AI), yang pada mulanya tidak
      menjamin Senior Notes tersebut.

      Perusahaan boleh, di masa yang akan datang,                    The Company may in the future designate its
      menunjuk entitas anaknya yang lain (selain AI) untuk           subsidiaries (other than AI) to guarantee the Senior
      memberikan jaminan atas Senior Notes.                          Notes.

      Senior Notes tersebut terdaftar        di   Singapore          The Senior Notes were listed on the Singapore
      Exchange Securities Trading.                                   Exchange Securities Trading.

      Pada setiap saat, tergantung pada syarat yang                  At any time, depending on the circumstances
      ditentukan dalam indenture, AI dapat dalam satu atau           specified in the indenture, AI may on any one or more
      beberapa kesempatan menarik seluruh atau                       occasions redeem all or a part of the Senior Notes, at
      sebagian dari Senior Notes, pada tingkat harga yang            predetermined redemption prices, plus accrued and
      ditentukan, ditambah dengan bunga yang terhutang               unpaid interest.
      dan belum dibayarkan.
Page 113
                                      PT ADARO ENERGY INDONESIA Tbk
                                 DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/101 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                 30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                              (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                       unless otherwise stated)

20.   SENIOR NOTES (lanjutan)                                  20.   SENIOR NOTES (continued)

      AI dan Perusahaan diharuskan untuk memenuhi                    AI and the Company are required to comply with
      beberapa persyaratan dan ketentuan tertentu                    certain terms and conditions on the incurrence of
      mengenai pengadaan pinjaman dan penerbitan                     indebtedness and issue of disqualified stock, the
      saham yang tidak memenuhi kualifikasi, penunjukan              designation of the Company’s subsidiaries as
      entitas anak Perusahaan sebagai Penjamin                       Subsidiary’s Guarantor, mergers, consolidations and
      (Subsidiary’s Guarantor), merger, konsolidasi dan              sales of assets, certain transactions with affiliates,
      penjualan aset, transaksi tertentu dengan afiliasi,            business activities and other matters. AI and the
      aktivitas bisnis, dan lainnya. AI dan Perusahaan telah         Company are in compliance with the related terms
      memenuhi persyaratan dan ketentuan tersebut.                   and conditions.

      Selama periode sembilan bulan yang berakhir pada               During the nine-month period ended 30 September
      30 September 2023, Vindoor, entitas anak tidak                 2023, Vindoor, the Company’s indirect subsidiary,
      langsung Perusahaan, membeli sebagian Senior                   purchased a portion of AI’s Senior Notes with the total
      Notes AI dengan total nilai nominal sebesar                    nominal amount of US$7,030 (for the nine-month
      AS$7.030 (untuk periode sembilan bulan yang                    period ended 30 September 2022: US$19,927) from
      berakhir pada 30 September 2022: AS$19.927) dari               the open market.
      pasar terbuka.

      Lihat Catatan 42(2) untuk informasi nilai wajar dari           Refer to Note 42(2) for information on the fair value of
      Senior Notes pada tanggal 30 September 2023 dan                Senior Notes as at 30 September 2023 and 31
      31 Desember 2022.                                              December 2022.


21.   LIABILITAS IMBALAN PASCA KERJA                           21.   POST-EMPLOYMENT BENEFITS LIABILITIES

      Liabilitas imbalan pasca kerja pada tanggal                    Post-employment         benefits    liabilities as     at
      31 Desember 2022 dihitung oleh Kantor Konsultan                31 December 2022 were calculated by Riana &
      Aktuaria Riana & Rekan, aktuaris independen,                   Partners Actuarial Consulting Firm, independent
      dengan laporan yang diterbitkan pada tahun 2023,               actuaries, in actuarial reports issued in 2023, while for
      sedangkan untuk jumlah liabilitas imbalan pasca                the post-employment benefit liabilities recognised in
      kerja yang diakui di laporan keuangan konsolidasian            the interim consolidated financial statements as at
      interim pada tanggal 30 September 2023 dan beban               30 September 2023 and post-employment benefits
      imbalan kerja untuk periode sembilan bulan yang                expense for the nine-month periods ended
      berakhir pada tanggal 30 September 2023 dan 2022               30 September 2023 and 2022 are based on the
      adalah berdasarkan proyeksi yang dihitung oleh                 projections calculated by Riana & Partners Actuarial
      Kantor Konsultan Aktuaria Riana & Rekan.                       Consulting Firm.

      Asumsi-asumsi utama yang digunakan dalam                       The principal assumptions used in determining the
      menentukan liabilitas imbalan pasca kerja karyawan             Group’s post-employment benefits liabilities are as
      Grup adalah sebagai berikut:                                   follows:

                                          30 September          31 Desember/
                                              2023             December 2022

      Tingkat diskonto                     6.50 - 7.50%        6.50% - 7.50%                                   Discount rate
      Tingkat kenaikan gaji                     5%                  5%                                    Salary growth rate
      Umur normal pensiun                       55                  55                               Normal retirement age
      Tingkat mortalitas dari Tabel                                                      Mortality rate from the Indonesian
        Mortalitas Indonesia              100% TMI IV           100% TMI IV                                Mortality Table
Page 114
                                        PT ADARO ENERGY INDONESIA Tbk
                                   DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                Lampiran 5/102 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                  NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                        FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                    30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                                 (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                          unless otherwise stated)

21.   LIABILITAS IMBALAN PASCA KERJA (lanjutan)                   21.    POST-EMPLOYMENT                BENEFITS      LIABILITIES
                                                                         (continued)

       Melalui program pensiun imbalan pasti, Grup                       Through its defined benefit pension plans, the Group
       menghadapi sejumlah risiko signifikan sebagai                     is exposed to a number of significant risks which are
       berikut:                                                          detailed below:
       1)    Perubahan tingkat diskonto                                  1) Changes in discount rate
             Penurunan        pada       tingkat   diskonto                   A decrease in discount rate will increase plan
             menyebabkan kenaikan liabilitas program.                         liabilities.
       2)    Tingkat kenaikan gaji                                       2) Salary growth rate
             Liabilitas imbalan pensiun Grup berhubungan                      The Group’s pension obligations are linked to
             dengan tingkat kenaikan gaji, dan semakin                        salary growth rate, and higher salary growth rate
             tinggi tingkat kenaikan gaji akan menyebabkan                    will lead to higher liabilities.
             semakin besarnya liabilitas.

      Sensitivitas liabilitas imbalan pasti terhadap perubahan           The sensitivity of the defined benefit obligation to
      asumsi utama tertimbang pada 30 September 2023                     changes in the weighted principal assumptions as at
      adalah sebagai berikut:                                            30 September 2023 is as follows:

                                                            Dampak terhadap liabilitas
                                                             imbalan pasti/Impact on
                                                            defined benefits obligation
                                   Perubahan              Kenaikan            Penurunan
                                    asumsi/                asumsi/             asumsi/
                                   Change in             Increase in           Decrease
                                  assumptions           Assumptions        in assumptions

       Tingkat diskonto                 1%                     (4,104)                 4,606                         Discount rate
       Tingkat kenaikan gaji            1%                      4,995                 (4,510)                   Salary growth rate

       Total liabilitas imbalan pasca kerja yang diakui di               Post-employment benefits liabilities recognised in
       laporan posisi keuangan konsolidasian interim pada                the interim consolidated statements of financial
       tanggal 30 September 2023 dan 31 Desember 2022                    position as at 30 September 2023 and 31 December
       ditentukan sebagai berikut:                                       2022 are computed as follows:

                                             30 September         31 Desember/
                                                 2023            December 2022

       Nilai kini dari kewajiban
        yang didanai                                 10,215                  9,393          Present value of funded obligations
       Nilai wajar dari aset program                 (1,427)                (1,335)                   Fair value of plan assets

       Defisit program yang didanai                   8,788                 8,058                       Deficit of the funded plans
       Nilai kini dari kewajiban yang
        tidak didanai                                56,208                51,230        Present value of unfunded obligations

       Total liabilitas                              64,996                59,288                                    Total liability

       Mutasi nilai wajar aset program Grup selama                       The movement in the Group’s fair value of plan
       periode/tahun berjalan adalah sebagai berikut:                    assets during the period/year is as follows:

                                             30 September         31 Desember/
                                                 2023            December 2022

      Pada awal periode/tahun                         1,335                 1,308               At the beginning of the period/year
      Penghasilan bunga dari
       aset program                                       76                  101               Interest income on plan assets
      Kerugian atas pengukuran kembali:                                                                   Remeasurement loss:
       Hasil dari aset program, tidak                                                                      Return on plan assets,
         termasuk jumlah yang dimasukkan                                                    excluding amount included in
         dalam penghasilan bunga                           -                   (87)                        interest income
      Perubahan selisih kurs                              16                    13                Foreign exchange difference

      Pada akhir periode/tahun                        1,427                 1,335                  At the end of the period/year
Page 115
                                       PT ADARO ENERGY INDONESIA Tbk
                                  DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/103 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                  30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                               (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                        unless otherwise stated)

21.   LIABILITAS IMBALAN PASCA KERJA (lanjutan)                21.     POST-EMPLOYMENT          BENEFITS      LIABILITIES
                                                                       (continued)

      Mutasi nilai kini kewajiban imbalan pasti Grup adalah           The movement in the present value of the Group’s
      sebagai berikut:                                                defined benefits obligation is as follows:

                                         30 September           31 Desember/
                                             2023              December 2022

      Pada awal periode/tahun                      60,623                68,177         At the beginning of the period/year
      Biaya jasa kini                               7,219                 4,405                        Current service cost
      Biaya bunga                                   3,293                 3,819                            Interest expense
      Biaya jasa lalu                                   -                  (253)                          Past service cost
      Pengukuran kembali:                                                                               Remeasurements:
      - Keuntungan dari perubahan                                                                    Gain from change in -
         asumsi keuangan                                  -                  (308)                 financial assumptions
      - Keuntungan dari penyesuaian                                                                Gain from experience -
         pengalaman                                       -                 (1,490)                           adjustments
      Imbalan yang dibayar                           (5,366)                (7,398)                            Benefits paid
      Perubahan selisih kurs                            654                 (6,329)           Foreign exchange difference

      Pada akhir periode/tahun                     66,423                60,623             At the end of the period/year

      Mutasi liabilitas imbalan kerja karyawan Grup adalah             The movement in the Group’s post-employment
      sebagai berikut:                                                 benefits liabilities is as follows:

                                         30 September           31 Desember/
                                             2023              December 2022

      Pada awal periode/tahun                      59,288                66,869         At the beginning of the period/year
      Biaya jasa kini                               7,219                 4,405                        Current service cost
      Biaya bunga, neto                             3,217                 3,718                       Interest expense, net
      Biaya jasa lalu                                   -                  (253)                          Past service cost
      Pengukuran kembali:                                                                                Remeasurements:
      - Keuntungan dari                                                                              Gain from change in -
        perubahan asumsi keuangan                         -                  (308)                 financial assumptions
      - Keuntungan dari penyesuaian                                                                Gain from experience -
        pengalaman                                        -                 (1,490)                          adjustments
      - Hasil dari aset program, tidak
        tidak termasuk jumlah yang                                                                Return on plan assets, -
        dimasukkan dalam                                                                    excluding amount included in
        penghasilan bunga                                 -                     87                       interest income
      Imbalan yang dibayar                           (5,366)                (7,398)                          Benefits paid
      Perubahan selisih kurs                            638                 (6,342)          Foreign exchange difference

      Pada akhir periode/tahun                     64,996                59,288             At the end of the period/year

      Jumlah yang diakui pada laba rugi adalah sebagai                The amounts recognised in profit or loss are as
      berikut:                                                        follows:

                                                     30 September
                                              2023                   2022

      Biaya jasa kini                                7,219                   6,565                    Current service cost
      Biaya bunga, neto                              3,217                   3,277                   Interest expense, net
      Biaya jasa lalu                                    -                      15                       Past service cost
      Perubahan selisih kurs                           638                  (4,385)           Foreign exchange difference

      Total                                        11,074                   5,472                                     Total

      Hasil aktual aset program untuk tahun yang berakhir              The actual return on plan assets for the year ended
      pada tanggal 31 Desember 2022 adalah rugi sebesar                31 December 2022 was a loss of US$101.
      AS$101.
Page 116
                                      PT ADARO ENERGY INDONESIA Tbk
                                 DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                             Lampiran 5/104 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                 NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                       FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                   30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                                (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                         unless otherwise stated)

21.   LIABILITAS IMBALAN PASCA KERJA (lanjutan)              21.        POST-EMPLOYMENT          BENEFITS      LIABILITIES
                                                                        (continued)

      Pada tanggal 30 September 2023 dan 31 Desember                    As at 30 September 2023 and 31 December 2022,
      2022, aset program ditempatkan seluruhnya pada                    the plan assets were fully invested in the money
      instrumen pasar uang yang tidak memiliki harga pasar              market, which did not have a quoted market.
      yang dikutip.

      Durasi rata-rata tertimbang kewajiban imbalan pasti               The weighted average duration of the defined
      pada akhir tahun pelaporan Grup berkisar antara                   benefits plan obligation at the end of the reporting
      4 sampai dengan 25 tahun.                                         year for the Group is approximately 4 to 25 years.

      Perkiraan analisis jatuh tempo atas imbalan pensiun               Expected maturity analysis of undiscounted pension
      tidak terdiskonto pada tanggal 30 September 2023                  benefits as at 30 September 2023 is presented
      adalah sebagai berikut:                                           below:

                        Kurang dari       Antara           Antara           Lebih dari
                          1 tahun/      1-2 tahun/       2-5 tahun/          5 tahun/
                         Less than       Between          Between              Over
                           1 year       1-2 years        2-5 years           5 years          Total

      Imbalan pensiun           1,745          7,866           31,100           360,728         401,439      Pension benefits

      Manajemen Grup berpendapat bahwa liabilitas                       The management of the Group believes that the
      imbalan pasca kerja cukup untuk menutupi semua                    estimated liability provided for post-employment
      imbalan pasca kerja yang diatur dalam Peraturan                   benefits is adequate to cover all post-employment
      Ketenagakerjaan atau PP atau PKB.                                 benefits requirements of the Manpower Regulations
                                                                        or CR or CLA.


22.   PROVISI  PEMBONGKARAN,    REHABILITASI,                22.        PROVISION FOR DECOMMISSIONING, MINE
      REKLAMASI DAN PENUTUPAN TAMBANG                                   REHABILITATION, RECLAMATION    AND
                                                                        CLOSURE

                                         30 September         31 Desember/
                                             2023            December 2022

      Saldo awal                                 183,754                180,457                         Beginning balance
      Penambahan                                  24,473                 19,688                                  Additions
      Realisasi                                   (5,164)               (15,679)                               Realisation
      Akresi                                         474                    489                                 Accretion
      Perubahan selisih kurs                        (368)                (1,201)               Foreign exchange difference

      Saldo akhir                                203,169                183,754                             Ending balance
      Dikurangi:                                                                                                     Less:
      Bagian jangka pendek                           2,850                 5,940                           Current portion

      Bagian jangka panjang                      200,319                177,814                       Non-current portion

      Penambahan provisi untuk periode sembilan bulan                   The additions in the provision for the nine-month
      yang berakhir pada tanggal 30 September 2023                      period ended 30 September 2023 were allocated to
      dialokasikan ke beban pokok pendapatan dan beban                  cost of revenue and other expenses amounting to
      lain-lain masing-masing adalah sebesar AS$21.085                  US$21,085 (for the nine-month period ended
      (untuk periode sembilan bulan yang berakhir pada                  30 September 2022: US$14,973) (Note 30) and
      tanggal 30 September 2022: AS14.973) (Catatan 30)                 US$3,065 (for the nine-month period ended 2022:
      dan AS$3.065 (untuk periode sembilan bulan yang                   US$1,017) (Note 32), respectively, with the
      berakhir pada tanggal 30 September 2022: AS$1.017)                remaining amount capitalised to mining properties
      (Catatan 32), dan sisa saldonya dikapitalisasikan ke              and fixed assets (Note 37a).
      properti pertambangan dan aset tetap (Catatan 37a).
Page 117
                                       PT ADARO ENERGY INDONESIA Tbk
                                  DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                               Lampiran 5/105 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                             (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                      unless otherwise stated)

22.   PROVISI    PEMBONGKARAN,  REHABILITASI,                  22.   PROVISION FOR DECOMMISSIONING, MINE
      REKLAMASI    DAN  PENUTUPAN  TAMBANG                           REHABILITATION,     RECLAMATION AND
      (lanjutan)                                                     CLOSURE (continued)

      Asumsi utama yang digunakan dalam perhitungan                  The key assumptions used in the calculation of the
      provisi pembongkaran, rehabilitasi, reklamasi, dan             provision for decommissioning, mine rehabilitation,
      penutupan tambang pada tanggal 30 September 2023               reclamation and closure as at 30 September 2023
      dan 31 Desember 2022 adalah sebagai berikut:                   and 31 December 2022 are as follows:

                                          30 September          31 Desember/
                                              2023             December 2022

      Tingkat inflasi                     2.30% - 4.90%        1.70% - 4.90%                                  Inflation rate
      Tingkat diskonto                    4.88% - 7.05%        4.08% - 7.32%                                 Discount rate

      Provisi pembongkaran, rehabilitasi, reklamasi dan              Provision for decommissioning, mine rehabilitation,
      penutupan tambang merupakan provisi yang                       reclamation and closure represents the provision set
      dibuat oleh Grup untuk memenuhi Peraturan                      up by the Group to comply with the Ministerial
      Menteri     Lingkungan     Hidup    dan     Kehutanan          Regulation      of    Environment     and    Forestry
      No. P.59/MENLHK/SETJEN/KUM.1/10/2019 (Catatan                  No. P.59/MENLHK/SETJEN/KUM.1/10/2019 (Note
      39i) dan PP No. 78 (Catatan 3 dan 40) untuk                    39i) and GR No. 78 (Notes 3 and 40) for
      rehabilitasi daerah aliran sungai, aktivitas reklamasi         rehabilitation of the watershed area, reclamation and
      dan pascatambang atas usaha penambangan                        post-mining activities for the coal mining business.
      batubara.

      Provisi pembongkaran ini juga sudah termasuk nilai             Provision for decommissioning also includes the
      provisi pembongkaran Pit Crushing and Conveying                provision for dismantling of the Pit Crushing and
      system (“PCC”). Grup mengakui penyisihan                       Conveying (“PCC”) system. The Group recognised
      pembongkaran PCC sebesar AS$13.026 pada tanggal                the provision for dismantling of the PCC amounting
      30 September 2023 (31 Desember 2022: AS$13.232).               to US$13,026 as at 30 September 2023
      Manajemen berkeyakinan bahwa total provisi atas                (31 December 2022: US$13,232). Management
      pembongkaran PCC merupakan estimasi terbaik saat               believes that the provision for dismantling of the PCC
      ini untuk menutupi arus kas keluar di masa depan               represents the current best estimate to cover future
      sehubungan dengan pembongkaran PCC di masa                     cash outflow in relation to the dismantling of the PCC
      depan. Seluruh kegiatan pembongkaran diharapkan                in the future. All the dismantling activities are
      diselesaikan pada tahun 2025.                                  expected to be completed by 2025.

      Manajemen berkeyakinan bahwa keseluruhan provisi               Management believes that the provision for
      pembongkaran, rehabilitasi, reklamasi dan penutupan            decommissioning, mine rehabilitation, reclamation
      tambang pada tanggal 30 September 2023 dan                     and closure as at 30 September 2023 and 31
      31 Desember 2022 telah cukup untuk memenuhi                    December 2022 is sufficient to meet the obligations
      kewajiban sebagaimana yang diatur pada Peraturan               as stipulated in the Minister of Environment and
      Menteri Lingkungan Hidup dan Kehutanan dan                     Forestry Regulation and GR No. 78, including the
      PP No. 78 di atas, termasuk biaya pembongkaran                 dismantling costs of the PCC.
      PCC.
Page 118
                                           PT ADARO ENERGY INDONESIA Tbk
                                      DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                     Lampiran 5/106 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                  NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                        FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                    30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                                 (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                          unless otherwise stated)

23. MODAL SAHAM DAN SAHAM TREASURI                                 23.   SHARE CAPITAL AND TREASURY SHARES
   Seluruh saham Perusahaan tercatat di Bursa Efek                       All shares in the Company have been listed on the
   Indonesia sejak 16 Juli 2008. Struktur pemegang                       Indonesia Stock Exchange since 16 July 2008. The
   saham Perusahaan pada tanggal 30 September 2023                       Company’s shareholders as at 30 September 2023
   dan 31 Desember 2022 berdasarkan catatan yang                         and 31 December 2022 based on the records
   dibuat oleh PT Kustodian Sentral Efek Indonesia, biro                 maintained by PT Kustodian Sentral Efek Indonesia,
   administrasi efek, adalah sebagai berikut:                            the share administrator, were as follows:
                                                                                            Persentase
                                                                          Lembar           kepemilikan/
                                                                          saham/            Percentage
                                                                         Number of         of ownership          Jumlah/
                     Pemegang saham/Shareholders                          shares                (%)              Amount
   30 September 2023
   PT Adaro Strategic Investments                                         14,045,425,500            43.91             150,589
   Garibaldi Thohir (Presiden Direktur/President Director)                 1,976,632,710             6.18              21,193
   Edwin Soeryadjaya (Presiden Komisaris/President Commissioner)           1,051,738,544             3.29              11,276
   Theodore Permadi Rachmat (Wakil Presiden Komisaris/
      Vice President Commissioner)                                          812,988,601              2.54                  8,717
   Arini Saraswaty Subianto (Komisaris/Commissioner)                         79,975,750              0.25                    857
   Christian Ariano Rachmat (Wakil Presiden Direktur/
      Vice President Director)                                                16,000,000             0.05                 172
   Julius Aslan (Direktur/Director)                                           11,000,000             0.03                 117
   Chia Ah Hoo (Direktur/Director)                                             9,593,500             0.03                 103
   Pemegang saham lainnya/Other shareholders                              12,877,851,295            40.27             138,071
   Total saham beredar/Total shares outstanding                           30,881,205,900            96.55             331,095
   Saham treasuri/Treasury shares                                          1,104,756,100             3.45              11,845
   Total saham ditempatkan dan disetor penuh/
     Total issued and fully paid shares                                   31,985,962,000           100.00             342,940
   31 Desember/December 2022
   PT Adaro Strategic Investments                                         14,045,425,500            43.91             150,589
   Garibaldi Thohir (Presiden Direktur/President Director)                 1,976,632,710             6.18              21,193
   Edwin Soeryadjaya (Presiden Komisaris/President Commissioner)           1,051,738,544             3.29              11,276
   Theodore Permadi Rachmat (Wakil Presiden Komisaris/
      Vice President Commissioner)                                          812,988,601              2.54                  8,717
   Arini Saraswaty Subianto (Komisaris/Commissioner)                         79,975,750              0.25                    857
   Christian Ariano Rachmat (Wakil Presiden Direktur/
      Vice President Director)                                                16,000,000             0.05                 172
   Julius Aslan (Direktur/Director)                                           11,000,000             0.03                 117
   Chia Ah Hoo (Direktur/Director)                                             9,593,500             0.03                 103
   Pemegang saham lainnya/Other shareholders                              12,982,607,395            40.59             139,194
   Total saham beredar/Total shares outstanding                           30,985,962,000            96.87             332,218
   Saham treasuri/Treasury shares                                          1,000,000,000             3.13              10,722
   Total saham ditempatkan dan disetor penuh/
     Total issued and fully paid shares                                   31,985,962,000           100.00             342,940

   Saham biasa memberikan hak kepada pemegangnya                         Ordinary shares entitle the holder to participate in
   untuk memperoleh dividen dan hasil dari pembubaran                    dividends and the proceeds on the winding up of the
   Perusahaan sesuai dengan proporsi jumlah lembar dan                   Company in proportion to the number of and
   jumlah yang dibayarkan atas saham yang dimiliki.                      amounts paid on the shares held.

   Pada tanggal 27 September 2021, Perusahaan                            On 27 September 2021, the Company announced its
   mengumumkan rencana pembelian kembali sahamnya                        plan to buyback its shares (“Buyback”) based on
   (“Pembelian Kembali”) berdasarkan Peraturan Otoritas                  Financial   Services    Authority’s    Regulation
   Jasa Keuangan No. 2/POJK.04/2013 dengan jumlah                        No. 2/POJK.04/2013 for a maximum amount of
   sebanyak-banyaknya sebesar Rp4.000.000.000.000                        Rp4,000,000,000,000 (full amount) (equivalent to
   (nilai penuh) (setara dengan AS$278.280). Program                     US$278,280). The Buyback program was
   Pembelian Kembali dilaksanakan untuk periode 3 (tiga)                 implemented in a period of 3 (three) months, from
   bulan, dari tanggal 27 September 2021 sampai dengan                   27 September 2021 to 26 December 2021.
   tanggal 26 Desember 2021. Periode Pembelian                           The Buyback period was then extended several
   Kembali kemudian diperpanjang beberapa kali, dengan                   times, with the latest period commencing on
   periode terakhir dilaksanakan pada 14 Februari 2023                   14 February 2023 to 12 May 2023.
   sampai dengan 12 Mei 2023.
Page 119
                                   PT ADARO ENERGY INDONESIA Tbk
                              DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                          Lampiran 5/107 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                 30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                              (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                       unless otherwise stated)

23. MODAL SAHAM DAN SAHAM TREASURI (lanjutan)               23.   SHARE CAPITAL AND TREASURY SHARES
                                                                  (continued)

    Pada tanggal 11 Mei 2023, Perusahaan mendapatkan               On 11 May 2023, the Company obtained the
    persetujuan dari Rapat Umum Pemegang Saham                     approval from its Annual General Meeting of
    Tahunan (“RUPST”) Perusahaan untuk melakukan                   Shareholders (“AGMS”) to conduct the Buyback
    Pembelian Kembali berdasarkan Peraturan Otoritas               based on the Financial Services Authority’s
    Jasa Keuangan No. 30/POJK.04/2017 dengan periode               Regulation No. 30/POJK.04/2017 for the Buyback
    pelaksanaan Pembelian Kembali selama 18 (delapan               period of 18 (eighteen) months from 12 May 2023 to
    belas) bulan terhitung sejak tanggal 12 Mei 2023               12 November 2024.
    sampai dengan 12 November 2024.

    Sampai dengan tanggal 30 September 2023,                       Up to 30 September 2023, the Company had
    Perusahaan telah melakukan Pembelian Kembali                   conducted the Buyback through the Indonesia Stock
    melalui Bursa Efek Indonesia sejumlah 1.104.756.100            Exchange totalling 1,104,756,100 shares (up to
    lembar saham (sampai dengan 31 Desember 2022:                  31 December 2022: 1,000,000,000 shares). The
    1.000.000.000 lembar saham). Total pembayaran                  total amount paid to acquire the shares was Rp2,279
    untuk mengakuisisi saham tersebut adalah sebesar               billion (full amount) or equivalent to US$158,308
    Rp2.279 miliar (nilai penuh) atau setara dengan                (31 December 2022: Rp2,005 billion (full amount) or
    AS$158.308 (31 Desember 2022: Rp2.005 miliar (nilai            equivalent to US$139,936).
    penuh) atau setara dengan AS$139.936).


24. TAMBAHAN MODAL DISETOR, NETO                            24.       ADDITIONAL PAID IN CAPITAL, NET

    Saldo tambahan modal disetor pada tanggal                      The balance of additional paid-in capital as at
    30 September 2023 dan 31 Desember 2022 adalah                  30 September 2023 and 31 December 2022 was as
    sebagai berikut:                                               follows:

                                                Jumlah/Amount

   Tambahan modal disetor saat
     Penawaran Umum Saham Perdana                         1,219,813                    Additional paid-in capital from IPO
   Biaya emisi saham                                        (44,532)                                 Share issuance costs
   Selisih nilai transaksi                                                             Difference in value of restructuring
     restrukturisasi entitas                                                               transactions of entities under
     sepengendali                                           (20,787)                                    common control

    Tambahan modal disetor, neto                          1,154,494                       Additional paid-in capital, net

    Tambahan modal disetor saat Penawaran Umum                        The additional paid-in capital from IPO resulted from
    Saham Perdana berasal dari Penawaran Umum                         the IPO in 2008.
    Saham Perdana yang dilakukan pada tahun 2008.
Page 120
                                       PT ADARO ENERGY INDONESIA Tbk
                                  DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                               Lampiran 5/108 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                 30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                              (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                       unless otherwise stated)

25.   SELISIH TRANSAKSI         DENGAN      PIHAK     NON-     25.   DIFFERENCE IN VALUE FROM TRANSACTIONS
      PENGENDALI                                                     WITH NON-CONTROLLING INTEREST

      Pada tanggal 12 Mei 2016, AI dan EGATi                         On 12 May 2016, AI and EGATi entered into the
      menandatangani Perjanjian Pengambilan Saham                    Subscription Agreement. On 22 November 2016 (the
      Baru. Pada tanggal 22 November 2016 (“Tanggal                  “Closing Date”), AI issued 57,857 shares to EGATi for
      Penutupan”), AI mengeluarkan 57.857 saham kepada               11.53% ownership in AI, with a par value of US$100
      EGATi untuk 11,53% kepemilikan di AI, dengan nilai             (full amount) per share, or a total nominal value
      nominal AS$100 (nilai penuh) per saham, atau dengan            amounting to US$5,786 which has been issued by AI
      total nilai nominal sebesar AS$5.786 yang telah                and subscribed by EGATi. The total value of the
      dikeluarkan oleh AI dan disetorkan oleh EGATi. Jumlah          transaction is US$325,000. EGATi paid the amount
      nilai transaksi adalah AS$325.000. EGATi membayar              of US$163,500 on the Closing Date and the
      sebesar AS$163.500 pada saat Tanggal Penutupan                 remaining amount (“Deferred Consideration”) will be
      dan sisanya (“Pembayaran yang Ditangguhkan”) akan              paid subject to meeting certain conditions.
      dibayarkan pada saat kondisi tertentu telah terpenuhi.

      Pada tanggal 31 Desember 2022, Grup mengakui                   As at 31 December 2022, the Group recognised the
      Pembayaran yang Ditangguhkan dari EGATi sebagai                Deferred Consideration from EGATi as the difference
      selisih transaksi dengan pihak non-pengendali sebesar          in value from transactions with non-controlling
      AS$145.800 karena kondisi tertentu dalam Perjanjian            interest amounting to US$145,800, as certain
      Pengambilan Saham Baru di atas ini telah dipenuhi              conditions in the Subscription Agreement have been
      selama tahun 2022. Sampai dengan tanggal 30                    met during 2022. Up to 30 September 2023, AI has
      September 2023, AI telah menerima pembayaran yang              received deferred consideration payments from
      ditangguhkan dari EGATi sebesar AS$66.700,                     EGATi of US$66,700, while the remaining balance
      sedangkan saldo sisa atas pembayaran yang                      amount of deferred consideration of US$79,100 is
      ditangguhkan sebesar AS$79.100 disajikan sebagai               presented as other receivables (Note 7b) in the
      piutang lain-lain (Catatan 7b) di laporan posisi               interim consolidated statement of financial position
      keuangan konsolidasian interim dan akan dibayarkan             and will be paid in accordance with the Subscription
      berdasarkan Perjanjian Pengambilan Saham Baru.                 Agreement.

      Pada tanggal 30 September 2023, saldo selisih                  As at 30 September 2023, the balance of difference
      transaksi dengan pihak non-pengendali dalam laporan            in value from transactions with non-controlling
      posisi keuangan konsolidasian interim adalah sebesar           interest in the interim consolidated statement of
      AS$154.773 (31 Desember 2022: AS$153.614).                     financial position amounted to US$154,773
                                                                     (31 December 2022: US$153,614).


26.   SALDO LABA                                               26.   RETAINED EARNINGS

                                                             Belum
                                      Dicadangkan/        dicadangkan/
                                      Appropriated       Unappropriated        Total

      Saldo pada tanggal                                                                                    Balance as at
        1 Januari 2022                         68,588          2,714,907       2,783,495                1 January 2022

      Laba periode berjalan yang                                                                        Profit for the period
        dapat diatribusikan kepada                                                                attributable to owners
        pemilik entitas induk                        -         1,903,401       1,903,401              of the parent entity
      Dividen (Catatan 27)                           -          (300,000)       (300,000)              Dividends (Note 27)

      Saldo pada tanggal                                                                                  Balance as at
        30 September 2022                      68,588          4,318,308       4,386,896           30 September 2022

      Saldo pada tanggal                                                                                    Balance as at
        1 Januari 2023                         68,588          4,412,865       4,481,453                1 January 2023

      Laba periode berjalan yang                                                                        Profit for the period
        dapat diatribusikan kepada                                                                attributable to owners
        pemilik entitas induk                        -         1,218,898       1,218,898              of the parent entity
      Dividen (Catatan 27)                           -          (500,000)       (500,000)              Dividends (Note 27)

      Saldo pada tanggal                                                                                  Balance as at
        30 September 2023                      68,588          5,131,763       5,200,351           30 September 2023
Page 121
                                        PT ADARO ENERGY INDONESIA Tbk
                                   DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                Lampiran 5/109 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                 NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                       FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                   30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                                (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                         unless otherwise stated)

26.   SALDO LABA (lanjutan)                                      26.   RETAINED EARNINGS (continued)

      Undang-Undang Perseroan Terbatas Republik                        The Limited Liability Company Law of the Republic of
      Indonesia No. 40/2007 (“UU No. 40/2007”) yang                    Indonesia No. 40/2007 (“UU No. 40/2007”), issued in
      dikeluarkan di bulan Agustus 2007, mengharuskan                  August 2007, requires the establishment of a general
      pembentukan cadangan umum dari laba bersih                       reserve from net income amounting to at least 20%
      sejumlah minimal 20% dari jumlah modal yang                      of a company’s issued and paid-up capital. This
      ditempatkan dan disetor penuh. Cadangan umum ini                 general reserve is presented as appropriated
      disajikan sebagai saldo laba dicadangkan pada                    retained earnings in the interim consolidated
      laporan posisi keuangan konsolidasian interim. Tidak             statements of financial position. There is no time limit
      ada batasan waktu untuk membentuk cadangan                       on the establishment of the reserve. The Company
      tersebut. Perusahaan telah melakukan penyisihan                  has set aside net profit up to the required reserve of
      laba bersih sampai cadangan mencapai 20% dari                    20% of the Company’s issued and paid-up capital as
      jumlah modal yang ditempatkan dan disetor                        stipulated in Law No. 40/2007.
      Perusahaan sebagaimana diatur dalam UU
      No. 40/2007.


27.   DIVIDEN                                                    27.   DIVIDENDS

      Pada RUPST Perusahaan yang diadakan pada                         At the Company’s AGMS held on 11 May 2023, total
      tanggal 11 Mei 2023, telah disetujui pembagian dividen           cash dividends for 2022 of US$500,000
      tunai final untuk tahun 2022 sejumlah AS$500.000                 (US$0.01618/share - full amount) were approved.
      (AS$0,01618/saham - nilai penuh). Dividen tunai final            The final cash dividends for 2022 were paid on 5 June
      tahun 2022 ini telah dibayarkan pada tanggal 5 Juni              2023. As at 30 September 2023, dividends payable
      2023. Pada tanggal 30 September 2023, utang dividen              represent SMP’s dividends payable to non-controlling
      merupakan utang dividen SMP kepada pihak non-                    interest amounting to US$1,980 (31 December 2022:
      pengendali sebesar AS$1.980 (31 Desember 2022:                   dividends payable consists of the Company’s
      utang dividen kepada pemegang saham Perusahaan                   dividends payable to shareholders amounting to
      sebesar AS$500.000 dan utang dividen AI dan SDM                  US$500,000 and AI’s and SDM’s dividends payable
      kepada pihak non-pengendali dengan total sebesar                 to non-controlling interests totalling to US$32,495).
      AS$32.495).

      Pada Rapat Dewan Komisaris dan Direksi Perusahaan                At the Company’s Boards of Commissioners and
      yang diadakan pada tanggal 21 Desember 2022, telah               Directors meeting held on 21 December 2022, interim
      disetujui pembayaran dividen tunai interim untuk tahun           cash dividends for 2022 of US$500,000
      2022 sejumlah AS$500.000 (AS$0,01613/saham -                     (US$0.01613/share - full amount) were approved.
      nilai penuh). Dividen tunai interim ini telah dibayarkan         The interim cash dividends were paid on 13 January
      pada tanggal 13 Januari 2023.                                    2023.

      Pada RUPST Perusahaan yang diadakan pada                         At the Company’s AGMS held on 27 April 2022, total
      tanggal 27 April 2022, telah disetujui pembagian                 cash dividends for 2021 of US$300,000
      dividen tunai final untuk tahun 2021 sejumlah                    (US$0.00965/share - full amount) were approved.
      AS$300.000 (AS$0,00965/saham - nilai penuh).                     The final cash dividends for 2021 were paid on 8 June
      Dividen tunai final tahun 2021 ini telah dibayarkan              2022.
      pada tanggal 8 Juni 2022.

      Pada Rapat Dewan Komisaris dan Direksi Perusahaan                At the Company’s Boards of Commissioners and
      yang diadakan pada tanggal 20 Desember 2021, telah               Directors Meeting held on 20 December 2021,
      disetujui pembayaran dividen tunai interim untuk tahun           interim cash dividends for 2021 of US$350,000
      2021 sejumlah AS$350.000 (AS$0,01122/saham - nilai               (US$0.01122/share - full amount) were approved.
      penuh). Dividen tunai interim tersebut telah dibayarkan          The interim cash dividends were paid on 14 January
      pada tanggal 14 Januari 2022.                                    2022.
Page 122
                                                PT ADARO ENERGY INDONESIA Tbk
                                           DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                           Lampiran 5/110 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                     NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                           FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                                       30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                                                    (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                                             unless otherwise stated)

28.   KEPENTINGAN NON-PENGENDALI                                                  28.      NON-CONTROLLING INTERESTS

                                                                                         30 September 2023
                                                            Penerbitan
                                                         saham entitas
                                                          anak kepada
                                                          kepentingan                                                  Bagian atas
                                                        non-pengendali/            Akuisisi                           penghasilan/
                                                           Issuance of          kepentingan                           komprehensif
                                                          subsidiaries’       non-pengendali/         Bagian atas     lain/Share in                    Saldo
                                         Saldo awal/         shares to         Acquisition of          laba neto/          other                       akhir/
                                         Beginning      non-controlling       non-controlling         Share in net    comprehensive     Dividen/      Ending
                                          balance            interests            interests              profit           income       Dividends      balance

      AI                                      114,026                     -                       -          73,243                -       (34,714)    152,555
      AMI                                      86,934                     -                       -          40,338                -             -     127,272
      Lain-lain (masing-masing dibawah
         AS$100.000)/Others (each
         below US$100,000)                    301,778             48,404                  (1,129)            45,355            1,150       (47,067)    348,491

      Total                                   502,738             48,404                  (1,129)           158,936            1,150       (81,781)    628,318


                                                                                    31 Desember/December 2022
                                                            Penerbitan
                                                         saham entitas
                                                          anak kepada                                                  Bagian atas
                                                          kepentingan                                                 penghasilan/
                                                        non-pengendali/                                                 (kerugian)
                                                           Issuance of           Uang muka                            komprehensif
                                                          subsidiaries’        setoran modal/         Bagian atas     lain/Share in                    Saldo
                                         Saldo awal/         shares to             Capital             laba neto/          other                       akhir/
                                         Beginning      non-controlling       contribution paid       Share in net    comprehensive     Dividen/      Ending
                                          balance            interests           in advance              profit        income/(loss)   Dividends      balance

      AI                                      114,524                     -                       -         182,641             557       (183,696)    114,026
      AMI                                      32,687                     -                       -          54,247                -             -      86,934
      Lain-lain (masing-masing dibawah
         AS$100.000)/Others (each
         below US$100,000)                    174,324             23,735                 31,244             101,155            (596)       (28,084)    301,778

      Total                                   321,535             23,735                 31,244             338,043             (39)      (211,780)    502,738



      KAI                                                                                   KAI

      Pada tanggal 20 Desember 2022, KAI melakukan                                          On 20 December 2022, KAI entered into a
      penandatanganan Perjanjian Pengambilan Saham                                          Conditional Share Subscription Agreement with PT
      Bersyarat dengan PT Cita Mineral Investindo Tbk                                       Cita Mineral Investindo Tbk (“CITA”) and Aumay
      (“CITA”) dan Aumay Mining Pte. Ltd. (“AUMAY”)                                         Mining Pte. Ltd. (“AUMAY”) under which KAI will
      dimana KAI akan menerbitkan saham baru dengan                                         issue new shares with a total nominal value of
      total nilai nominal sebesar (i) Rp330.624.000.000                                     (i) Rp330,624,000,000 (full amount) (or equivalent
      (nilai penuh) (atau setara dengan AS$21.306) kepada                                   to US$21,306) for CITA which represents
      CITA yang mewakili 12,5% kepemilikan di KAI, dan                                      12.5% ownership interest in KAI, and
      (ii) Rp595.124.000.000 (nilai penuh) (atau setara                                     (ii) Rp595,124,000,000 (full amount) (or equivalent
      dengan AS$38.352) kepada AUMAY yang mewakili                                          to US$38,352) for AUMAY which represents 22.5%
      22,5% kepemilikan di KAI. Pada tanggal 14 dan                                         ownership interest in KAI. On 14 and 27 December
      27 Desember 2022, KAI menerima uang muka                                              2022, KAI received the share capital injection in
      setoran modal saham dengan total sebesar                                              advance totalling US$31,244 and the remaining
      AS$31.244 dan sisa setoran modal saham sebesar                                        balance totalling US$28,352 was received by KAI
      AS$28.352 diterima oleh KAI pada tanggal 12 Januari                                   on 12 January 2023.
      2023.

      Berdasarkan Akta No. 51 tanggal 30 Januari 2023,                                     Based on Deed No. 51 dated 30 January 2023,
      yang telah memperoleh Penerimaan Pemberitahuan                                       which has received Receipt of Notification dated
      dari Menteri Hukum dan Hak Asasi Manusia                                             7 February 2023, the share capital injection of CITA
      tertanggal 7 Februari 2023, setoran modal saham                                      and AUMAY were effective.
      CITA dan AUMAY tersebut telah efektif.
Page 123
                                   PT ADARO ENERGY INDONESIA Tbk
                              DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                         Lampiran 5/111 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                            30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                         (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                  unless otherwise stated)

28.   KEPENTINGAN NON-PENGENDALI (lanjutan)              28.     NON-CONTROLLING INTERESTS (continued)

      KPI                                                        KPI

      Pada tanggal 20 Desember 2022, KPI melakukan               On 20 December 2022, KPI entered into a
      penandatanganan Perjanjian Pengambilan Saham               Conditional Share Subscription Agreement with
      Bersyarat dengan CITA. Berdasarkan Akta No. 138            CITA. Based on Deed No. 138 dated 26 December
      tertanggal 26 Desember 2022 dan Akta No. 24                2022 and Deed No. 24 dated 13 April 2023, KPI
      tertanggal 13 April 2023, KPI menerima setoran             received the capital injection from CITA totalling
      modal dari CITA sebesar AS$39.954 yang mewakili            US$39,954 which represents 16% ownership
      persentase kepemilikan sebesar 16% di KPI.                 interest in KPI.


29.   PENDAPATAN USAHA                                   29.     REVENUE

                                                30 September
                                         2023                  2022

      Pihak ketiga:                                                                                  Third parties:
       Penjualan batubara                                                                          Sales of coal
         Ekspor                            4,098,721            5,168,791                               Export
         Domestik                            592,466              579,928                            Domestic

       Sub-total                           4,691,187            5,748,719                               Sub-total

       Jasa pertambangan                                                                        Mining services
         Domestik                                                                                    Domestic
          Jasa pertambangan                  98,702               83,726                    Mining services
          Jasa sewa                              42                  110                    Rental services

       Sub-total                             98,744               83,836                                Sub-total

       Lain-lain                                                                                         Others
         Domestik                            44,216               35,481                              Domestic

      Pihak berelasi:                                                                              Related parties:
       Penjualan batubara                                                                          Sales of coal
         Domestik                           145,847               44,056                             Domestic

       Jasa pertambangan                                                                       Mining services
         Domestik                                                                                     Domestic
           Jasa sewa                                8                     -                  Rental services

       Lain-lain                                                                                        Others
         Domestik                               1,094                 1,057                           Domestic

       Sub-total                            146,949               45,113                                Sub-total

      Total                                4,981,096            5,913,149                                    Total
Page 124
                                       PT ADARO ENERGY INDONESIA Tbk
                                  DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                               Lampiran 5/112 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                  30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                               (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                        unless otherwise stated)

29. PENDAPATAN USAHA (lanjutan)                                29.    REVENUE (continued)

      Rincian   pelanggan     yang     memiliki transaksi             Details of customers with revenue transactions that
      pendapatan lebih dari 10% dari total pendapatan                 represent more than 10% of the total interim
      usaha konsolidasian interim untuk periode sembilan              consolidated revenue for the nine-month periods
      bulan yang berakhir pada tanggal 30 September 2023              ended 30 September 2023 and 2022 are as follows:
      dan 2022 adalah sebagai berikut:

                                                      30 September
                                               2023                  2022

      Pihak ketiga:                                                                                          Third party:
        TNB Fuel Services Sdn. Bhd.               803,527              899,092             TNB Fuel Services Sdn. Bhd.

      Lihat Catatan 34 untuk informasi rincian transaksi dan           Refer to Note 34 for information on the details of
      saldo dengan pihak berelasi.                                     transactions and balances with related parties.


30.   BEBAN POKOK PENDAPATAN                                   30.    COST OF REVENUE

                                                      30 September
                                               2023                  2022

      Penjualan batubara                                                                                    Sales of coal
        Royalti kepada Pemerintah               1,169,626              881,618                 Royalties to Government
        Pertambangan                              984,173              814,068                                   Mining
        Pengangkutan dan
          bongkar muat                            291,218              220,378               Freight and handling costs
        Pemrosesan batubara                       240,989              140,094                          Coal processing
        Penyusutan (Catatan 10)                   157,241              217,549                   Depreciation (Note 10)
        Amortisasi properti                                                                              Amortisation of
          pertambangan (Catatan 12)                43,527              202,244            mining properties (Note 12)
        Biaya reklamasi dan penutupan                                                             Mine reclamation and
          tambang (Catatan 22)                     21,085               14,973                closure costs (Note 22)
        Persediaan batubara
          (Catatan 9):                                                                           Coal inventory (Note 9):
          Saldo awal                               131,920               77,055                    Beginning balance
          Saldo akhir                             (158,866)            (120,671)                       Ending balance

      Total beban pokok pendapatan -
        penjualan batubara                      2,880,913             2,447,308        Total cost of revenue - sales of coal

      Jasa pertambangan                                                                                  Mining services
        Pemakaian bahan                            39,208               41,132                            Consumables
        Penyusutan (Catatan 10)                    14,846               14,899                   Depreciation (Note 10)
        Perbaikan dan pemeliharaan                  9,713                9,224                 Repairs and maintenance
        Biaya karyawan                              8,414                7,410                          Employee costs
        Subkontraktor                               4,900                6,989                           Subcontractors
        Lain-lain                                   6,595                3,421                                   Others

      Total beban pokok pendapatan -
        jasa pertambangan                          83,676               83,075      Total cost of revenue - mining services

      Lain-lain                                                                                                    Others
        Penyusutan (Catatan 10)                       5,324                 5,153                 Depreciation (Note 10)
        Pemakaian bahan                               4,674                 2,233                         Consumables
        Jasa perbaikan dan
          pemeliharaan                              2,277                   2,050              Repairs and maintenance
        Lain-lain                                  16,461                   8,279                                Others

      Total beban pokok pendapatan -
        lain-lain                                  28,736               17,715               Total cost of revenue - others

      Total                                     2,993,325             2,548,098                                       Total

      Tidak ada transaksi pembelian kepada satu pemasok               There were no purchase transactions made with any
      dengan total transaksi kumulatif lebih dari 10% dari            single supplier with a cumulative amount exceeding
      total pendapatan usaha konsolidasian interim untuk              10% of the total interim consolidated revenue for the
      periode sembilan bulan yang berakhir pada tanggal               nine-month periods ended 30 September 2023 and
      30 September 2023 dan 2022.                                     2022.
Page 125
                                       PT ADARO ENERGY INDONESIA Tbk
                                  DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                           Lampiran 5/113 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                  30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                               (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                        unless otherwise stated)

31. BEBAN USAHA                                             31.     OPERATING EXPENSES

                                                  30 September
                                           2023                   2022

   Penjualan dan pemasaran                                                                        Selling and marketing
     Komisi penjualan                          82,036                   90,291                       Sales commission
     Lain-lain                                    106                       88                                 Others

         Sub-total                             82,142                   90,379                                Sub-total

   Umum dan administrasi                                                                    General and administrative
     Biaya karyawan                            87,455                   72,937                        Employee costs
     PNBP dan pendapatan
       pemerintah daerah                                                                PNBP and regional government
       (Catatan 17 dan 39o)                    70,562                         -         revenue (Notes 17 and 39o)
     Cadangan untuk pembayaran
       penetapan pemerintah                                                          Allowance for Government charges
       (Catatan 17 dan 39m)                    25,241                    5,641                   (Notes 17 and 39m)
     Jasa profesional                          17,576                   21,505                        Professional fees
     Pajak final                                6,618                    6,096                                 Final tax
     Penyusutan (Catatan 10)                    6,036                    4,970                   Depreciation (Note 10)
     Beban kantor                               5,511                    4,430                         Office expenses
     Lain-lain                                 31,263                   25,863                                   Others

         Sub-total                            250,262               141,442                                    Sub-total

   Total                                      332,404               231,821                                         Total

32. (BEBAN)/PENDAPATAN LAIN-LAIN, NETO                      32.    OTHER (EXPENSES)/INCOME, NET

                                                  30 September
                                           2023                   2022

   Kerugian neto nilai wajar                                                                   Net losses on fair value of
      atas investasi lain-lain                                                                        other investments
      (Catatan 6b dan 6c)                      (26,062)                  (4,392)                      (Notes 6b and 6c)
   (Kerugian)/keuntungan
      selisih kurs, neto                          (9,340)               28,695      Foreign exchange (losses)/gains, net
   Biaya pembongkaran (Catatan 22)                (3,065)               (1,017)        Decommissioning costs (Note 22)
   Kerugian atas pelepasan                                                               Loss on disposal of fixed assets
      aset tetap (Catatan 10)                     (4,088)                (3,287)                               (Note 10)
   Kerugian atas instrumen keuangan                                                          Loss on derivative financial
      derivatif                                       -                  (7,343)                          instruments
   Lain-lain                                      5,847                   5,729                                    Others

   Total, neto                                 (36,708)                 18,385                                 Total, net

33. PERPAJAKAN                                              33.    TAXATION

    a.      Pajak dibayar dimuka                                   a.       Prepaid taxes

                                        30 September         31 Desember/
                                            2023            December 2022

            PPN                                75,685                   35,785                                       VAT
            PPh Badan                          26,203                   11,570                                       CIT

            Total                             101,888                   47,355                                      Total

            Dikurangi: bagian lancar           93,631                   44,386                     Less: current portion

            Bagian tidak lancar                   8,257                  2,969                      Non-current portion
Page 126
                                       PT ADARO ENERGY INDONESIA Tbk
                                  DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                           Lampiran 5/114 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                 30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                              (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                       unless otherwise stated)

33. PERPAJAKAN (lanjutan)                                 33.     TAXATION (continued)

    b.   Pajak yang bisa dipulihkan kembali                        b.      Recoverable taxes

                                        30 September       31 Desember/
                                            2023          December 2022

         Piutang Pajak Bahan Bakar
             Kendaraan Bermotor
             (“PBBKB”)                         39,186                   39,196    Vehicle fuel tax (“PBBKB”) receivables

          Piutang PBBKB merupakan saldo PBBKB yang                         The PBBKB receivables represent the balance
          dapat dikompensasi kepada Pemerintah.                            of PBBKB that is reimbursable by the
          Pemerintah telah menetapkan bahwa PBBKB                          Government. The Government has confirmed
          adalah pajak baru dan oleh karena itu dapat                      that PBBKB is a new tax and therefore is
          dikompensasi menurut PKP2B. Sebagai                              reimbursable according to the provisions of the
          tambahan, berdasarkan Amandemen PKP2B                            CCA. In addition, based on the Amendment to
          (Catatan 1c), dalam hal AI membayar PBBKB,                       the CCA (Note 1c), in the case of AI paying
          AI dapat melakukan kompensasi PBBKB                              PBBKB, AI is allowed to offset PBBKB against
          dimaksud terhadap bagian Pemerintah yang                         the Government’s share of 13.5% at the
          sebesar 13,5% paling cepat 60 hari setelah                       soonest 60 days after payment of that PBBKB
          dilakukan pembayaran PBBKB dimaksud oleh                         is made by AI. Based on the IUPK for
          AI. Berdasarkan IUPK sebagai Kelanjutan                          the Continuation of Contract/Agreement
          Operasi Kontrak/Perjanjian, PBBKB yang                           Operation, the PBBKB paid until the end of
          dibayarkan sampai dengan akhir tahun pajak                       2022 fiscal year is still allowed to be offset
          2022 masih diperbolehkan untuk dikompensasi                      against the Government’s share.
          terhadap bagian Pemerintah.

          Selama periode sembilan bulan yang berakhir                      During the nine-month periods ended
          pada tanggal 30 September 2023 dan 2022,                         30 September 2023 and 2022, AI had not
          AI belum mengkompensasikan klaim atas                            offset reimbursement claims for PBBKB
          PBBKB terhadap utang royalti yang masih                          against royalties payable to the Government.
          terutang kepada Pemerintah.

    c.    Utang pajak                                              c.      Taxes payable

                                        30 September       31 Desember/
                                            2023          December 2022

          PPh Badan                            70,116             1,144,085                                          CIT
          Pajak lain-lain:                                                                                   Other taxes:
          - Pajak bumi dan
              bangunan                         31,615                       53                   Land and building tax -
          - PPN                                10,784                   12,043                                   VAT -
          - Pajak penghasilan
              pasal 23 dan 26                     6,458                 13,335           Income tax articles 23 and 26 -
          - Lain-lain                             3,351                  6,531                                  Others -

          Total                               122,324             1,176,047                                         Total

     d. Beban pajak penghasilan                                   d.       Income tax expense

                                                  30 September
                                           2023                  2022

         Pajak penghasilan kini               352,492             1,225,447                           Current income tax
         Pajak penghasilan
            tangguhan                          (26,300)                (68,302)                      Deferred income tax
         Beban pajak dari
            penyesuaian pajak                                                         Income tax expense from prior year
            tahun sebelumnya                      6,140                  7,910                        tax adjustments

         Total beban pajak
            penghasilan                                                                             Total consolidated
            konsolidasian                     332,332             1,165,055                      income tax expense
Page 127
                                      PT ADARO ENERGY INDONESIA Tbk
                                 DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                           Lampiran 5/115 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                  30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                               (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                        unless otherwise stated)

33.   PERPAJAKAN (lanjutan)                                 33.    TAXATION (continued)

      d. Beban pajak penghasilan (lanjutan)                        d.       Income tax expense (continued)

          Pajak atas laba sebelum pajak penghasilan                         The tax on interim consolidated profit before
          konsolidasian interim berbeda dengan jumlah                       income tax differs from the theoretical amount
          teoritis yang dihitung menggunakan rata-rata                      that would arise using the weighted average
          tertimbang tarif pajak yang berlaku atas laba                     tax rate applicable to profits of the consolidated
          masing-masing entitas anak yang dikonsolidasi                     subsidiaries as follows:
          sebagai berikut:

                                                  30 September
                                           2023                   2022
          Laba sebelum
             pajak penghasilan                                                                    Consolidated profit before
             konsolidasian                    1,710,166            3,333,593                                  income tax

          Pajak dihitung dengan tarif                                                                      Tax calculated at
             pajak yang berlaku                375,063             1,208,899                          applicable tax rates
          Penghasilan yang telah
             dikenakan pajak final              (92,817)                (68,939)                 Income subject to final tax
          Beban yang tidak dapat
             dikurangkan menurut
             pajak                               67,737                  39,029                   Non-deductible expenses
          Hasil pemeriksaan pajak                 2,269                   3,765                     Tax audit assessments
          Lain-lain                             (19,920)                (17,699)                                   Others
          Beban pajak penghasilan                                                                    Consolidated income
            konsolidasian                      332,332             1,165,055                               tax expense

         Rekonsiliasi antara laba sebelum pajak                             The reconciliation between the interim
         penghasilan konsolidasian interim dengan                           consolidated profit before income tax and
         estimasi penghasilan kena pajak konsolidasian                      estimated consolidated taxable income is as
         adalah sebagai berikut:                                            follows:

                                                  30 September
                                           2023                   2022
         Laba sebelum
             pajak penghasilan                                                                   Consolidated profit before
             konsolidasian                    1,710,166            3,333,593                                 income tax
         Dikurangi:                                                                                                   Less:
         Laba sebelum pajak
             penghasilan -                                                                        Profit before income tax -
             Entitas anak                  (1,715,998)            (3,372,526)                                Subsidiaries
         Disesuaikan dengan jurnal                                                             Adjustment for consolidation
             eliminasi konsolidasian              9,736                 24,242                         elimination entries
         Laba/(rugi) sebelum pajak
             penghasilan -                                                                  Profit/(loss) before income tax -
             Perusahaan                           3,904                 (14,691)                             the Company
         Koreksi fiskal:                                                                                Fiscal corrections:
         Penghasilan yang telah
            dikenakan pajak final                 (1,016)                 (740)                  Income subject to final tax
         Beban yang tidak dapat
            dikurangkan
            menurut pajak                       10,722                  23,907                    Non-deductible expenses

         Sub-total                                9,706                 23,167                                     Sub-total

         Laba kena
            pajak - Perusahaan                  13,610                    8,476            Taxable income - the Company
         Pajak penghasilan kini -                                                                      Current income tax -
             Perusahaan                           2,586                  1,865                             the Company
         Pajak penghasilan kini -                                                                      Current income tax -
             Entitas anak                      349,906             1,223,582                                Subsidiaries
         Pajak penghasilan kini                                                                              Consolidated
             konsolidasian                     352,492             1,225,447                         current income tax
Page 128
                                                  PT ADARO ENERGY INDONESIA Tbk
                                             DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                                  Lampiran 5/116 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                       NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                             FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                                                         30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                                                                      (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                                                               unless otherwise stated)

33.   PERPAJAKAN (lanjutan)                                                                33.            TAXATION (continued)

      d. Beban pajak penghasilan (lanjutan)                                                               d. Income tax expense (continued)

           Perhitungan pajak merupakan estimasi yang akan                                                       The tax calculations are estimates which may be
           diperbarui ketika pengembalian pajak telah                                                           updated when tax returns are filed.
           diajukan.

           Laba kena pajak hasil rekonsiliasi menjadi dasar                                                     The taxable income resulting from the
           dalam pengisian Surat Pemberitahuan Tahunan                                                          reconciliation will become the basis for filing the
           PPh Badan.                                                                                           Annual CIT Return.

           Pajak     penghasilan    sehubungan  dengan                                                          The income tax relating to other comprehensive
           penghasilan komprehensif lain selama periode                                                         income during the period is as follows:
           berjalan adalah sebagai berikut:
                                                        30 September 2023                                                  30 September 2022
                                            Sebelum                                                        Sebelum
                                             pajak/         Beban pajak/        Setelah pajak/              pajak/           Beban pajak/      Setelah pajak/
                                           Before tax       Tax charges           After tax               Before tax         Tax charges         After tax

           Lindung nilai arus kas                       -                   -                    -               (3,903)             1,756                (2,147)           Cash flow hedges


      e.   Aset/(liabilitas) pajak tangguhan                                                              e.       Deferred tax assets/(liabilities)
                                                                                      30 September 2023
                                                                                                       Reklasifikasi
                                                                                                         aset pajak
                                                                                                         tangguhan
                                                                                                           menjadi
                                                                                  Dikreditkan/        liabilitas pajak
                                                                                 (dibebankan)           tangguhan/
                                                                                      pada           Reclassification
                                                                                    laba rugi/               from
                                                                                    Credited/           deferred tax
                                                        Saldo awal/               (charged) to            assets to                  Saldo akhir/
                                                        Beginning                    profit or          deferred tax                   Ending
                                                         balance                       loss               liabilities                  balance

           Aset pajak tangguhan                                                                                                                                           Deferred tax assets
           Aset tetap                                             7,068                      (682)                      (4,659)                  1,727                            Fixed assets
           Liabilitas imbalan pasca                                                                                                                                 Post-employment benefits
             kerja                                              11,357                      1,030                         588                   12,975                             liabilities
           Properti pertambangan                                38,890                     (4,883)                      1,468                   35,475                       Mining properties
           Perbedaan sewa                                                                                                                                           Differences in fixed assets
              aset tetap dan                                                                                                                                              under leases and
              angsuran sewa                                     13,502                      4,814                           667                 18,983                    lease instalments
           Cadangan untuk
              pembayaran
              penetapan                                                                                                                                                          Allowance for
              Pemerintah                                                -                   4,947                      15,827                   20,774              Government charges
           Penyisihan kerugian                                                                                                                                               Loss allowances
              piutang usaha                                       2,321                          522                          -                  2,843               of trade receivables
           Rugi fiskal yang dibawa                                                                                                                                          Tax losses carried
            ke masa depan                                              16                        (16)                         -                       -                             forward
           Provisi pembongkaran,                                                                                                                                                  Provision for
             rehabilitasi, dan penutupan                                                                                                                          decommissioning, mine
             tambang                                              7,894                      (117)                          132                  7,909          rehabilitation and closure
           Lain-lain                                                215                       (16)                            6                    205                                  Others

           Aset pajak tangguhan -                                                                                                                                     Deferred tax assets at
            akhir periode                                       81,263                      5,599                      14,029                  100,891              the end of the period

           Liabilitias pajak tangguhan                                                                                                                                 Deferred tax liabilities
           Properti pertambangan                               (150,958)                    5,956                       (1,468)              (146,470)                         Mining properties
           Aset tetap                                            (9,552)                   (2,486)                       4,659                 (7,379)                             Fixed assets
           Perbedaan sewa                                                                                                                                           Differences in fixed assets
             aset tetap dan                                                                                                                                                under leases and
             angsuran sewa                                         (602)                    1,062                          (667)                  (207)                    lease instalments
           Penyisihan kerugian                                                                                                                                                 Loss allowances
             piutang usaha                                             19                            36                       -                     55                  of trade receivables
           Biaya pinjaman yang                                                                                                                                           Capitalised borrowing
             dikapitalisasi                                      (3,543)                         166                          -                 (3,377)                                 cost
           Cadangan untuk
             pembayaran
             penetapan                                                                                                                                                          Allowance for
             Pemerintah                                                 -                  15,827                      (15,827)                       -             Government charges
           Liabilitas imbalan pasca                                                                                                                                Post-employment benefits
             kerja                                                    961                            70                    (588)                   443                           liabilities
           Provisi pembongkaran,                                                                                                                                                 Provision for
             rehabilitasi, dan penutupan                                                                                                                          decommissioning, mine
             tambang                                                  102                            30                    (132)                     -          rehabilitation and closure
           Lain-lain                                                  163                            40                      (6)                   197                                  Others

           Liabilitas pajak tangguhan -                                                                                                                             Deferred tax liabilities at
            akhir periode                                      (163,410)                   20,701                      (14,029)              (156,738)              the end of the period
Page 129
                                                    PT ADARO ENERGY INDONESIA Tbk
                                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                             Lampiran 5/117 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                                            30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                                                         (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                                                  unless otherwise stated)

33.   PERPAJAKAN (lanjutan)                                                        33.       TAXATION (continued)

      e. Aset/(liabilitas) pajak tangguhan (lanjutan)                                        e.       Deferred tax assets/(liabilities) (continued)
                                                                            31 Desember/December 2022
                                                                         Dikreditkan/
                                                                        (dibebankan)
                                                                              pada          (Dibebankan)/
                                                                           laba rugi/        dikreditkan
                                                                           Credited/        pada ekuitas/
                                                    Saldo awal/          (charged) to         (Charged)/                Saldo akhir/
                                                    Beginning               profit or         credited to                 Ending
                                                     balance                 loss1)             equity1)                  balance

              Aset pajak tangguhan                                                                                                                      Deferred tax assets
              Aset tetap                                   (10,410)               17,478                        -                 7,068                          Fixed assets
              Liabilitas imbalan pasca                                                                                                           Post-employment benefits
                kerja                                        8,433                 (1,321)                  4,245                11,357                           liabilities
              Properti pertambangan                         43,568                 (4,678)                      -                38,890                     Mining properties
              Perbedaan sewa                                                                                                                     Differences in fixed assets
                 aset tetap dan                                                                                                                         under leases and
                 angsuran sewa                              35,213                (21,711)                      -                13,502                 lease instalments
              Penyisihan kerugian                                                                                                                           Loss allowances
                 piutang usaha                                    717              1,604                        -                 2,321              of trade receivables
              Rugi fiskal yang dibawa                                                                                                                      Tax losses carried
                ke masa depan                                       -                 16                        -                      16                           forward
              Provisi pembongkaran,                                                                                                                              Provision for
                 rehabilitasi, dan penutupan                                                                                                    decommissioning, mine
                 tambang                                    15,198                 (7,304)                      -                 7,894       rehabilitation and closure
              Lain-lain                                        214                      1                       -                   215                                  Others

              Aset pajak tangguhan -                                                                                                               Deferred tax assets at
                akhir tahun                                 92,933                (15,915)                  4,245                81,263            the end of the year

              Liabilitas pajak tangguhan                                                                                                            Deferred tax liabilities
              Properti pertambangan                       (176,737)               25,779                        -              (150,958)                    Mining properties
              Aset tetap                                    (8,555)                 (997)                       -                (9,552)                        Fixed assets
              Perbedaan sewa                                                                                                                     Differences in fixed assets
                 aset tetap dan                                                                                                                         under leases and
                 angsuran sewa                                    385               (987)                       -                  (602)                lease instalments
              Penyisihan kerugian                                                                                                                           Loss allowances
                 piutang usaha                                      -                 19                        -                      19            of trade receivables
              Biaya pinjaman yang                                                                                                                     Capitalised borrowing
                dikapitalisasi                              (3,765)                  222                        -                (3,543)                               cost
              Liabilitas imbalan pasca                                                                                                           Post-employment benefits
                kerja                                        1,057                    (69)                    (27)                  961                          liabilities
              Provisi pembongkaran,                                                                                                                             Provision for
                rehabilitasi, dan penutupan                                                                                                     decommissioning, mine
                tambang                                            82                 20                        -                   102       rehabilitation and closure
              Lain-lain                                           137                 26                        -                   163                                 Others

              Liabilitas pajak tangguhan                                                                                                         Deferred tax liabilities at
                 akhir tahun                              (187,396)               24,013                      (27)             (163,410)           the end of the year

         1)    Termasuk penyesuaian tarif pajak AI dari 45% menjadi 22% sebesar                       1)   Including adjustments of AI’s tax rate from 45% to 22% amounted
               AS$50.422 yang dibebankan pada laba rugi dan AS$4.564 yang                                  to US$50,422 which was charged to profit or loss and US$4,564
               dikreditkan pada ekuitas (Catatan 33h).                                                     which was credited to equity (Note 33h).


              Karena beberapa entitas anak dalam posisi rugi                                          Due to the fact that several subsidiaries are in
              dan hanya berfungsi sebagai kantor pusat saja,                                          a loss position and only function as head
              terdapat pembatasan pemakaian rugi fiskal yang                                          offices, there is a limitation on the future use of
              dibawa ke masa depan dan ketidakpastian                                                 tax losses carried forward and also uncertainty
              apakah aset pajak tangguhan ini dapat                                                   as to whether the deferred tax assets will be
              terealisasi. Karena itu, terdapat aset pajak                                            realised. Thus, a portion of the deferred tax
              tangguhan yang berkaitan dengan rugi fiskal                                             assets relating to tax losses carried forward
              yang dibawa ke masa depan dan liabilitas                                                and post-employment benefits liabilities has
              imbalan pasca kerja tidak diakui di dalam laporan                                       not been recognised in these interim
              keuangan konsolidasian interim ini.                                                     consolidated financial statements.
Page 130
                                      PT ADARO ENERGY INDONESIA Tbk
                                 DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                               Lampiran 5/118 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                            30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                                         (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                                  unless otherwise stated)

33.   PERPAJAKAN (lanjutan)                                       33.      TAXATION (continued)

      e.   Aset/(liabilitas) pajak tangguhan (lanjutan)                      e.        Deferred tax assets/(liabilities) (continued)

           Analisis aset pajak tangguhan adalah sebagai                                The analysis of deferred tax assets is as
           berikut:                                                                    follows:

                                          30 September             31 Desember/
                                              2023                December 2022

           Aset pajak tangguhan
             yang akan dipulihkan                                                                 Deferred tax assets to be recovered
             dalam 12 bulan                             32,033                     12,686                         within 12 months
           Aset pajak tangguhan
             yang akan dipulihkan                                                                 Deferred tax assets to be recovered
             setelah 12 bulan                           68,858                     68,577                          after 12 months

           Total                                   100,891                         81,263                                              Total

           Manajemen berpendapat jika aset pajak                                      Management believes that the deferred tax
           tangguhan dapat dipulihkan sesuai dengan                                   assets could be recovered within the expected
           periode realisasi yang diekspektasikan.                                    realisation period.

           Analisis liabilitas pajak tangguhan adalah                                 The analysis of deferred tax liabilities is as
           sebagai berikut:                                                           follows:

                                          30 September             31 Desember/
                                              2023                December 2022

           Liabilitas pajak tangguhan
             yang akan diselesaikan                                                                    Deferred tax liabilities to be settled
             dalam 12 bulan                              7,395                      6,713                              within 12 months
           Liabilitas pajak tangguhan
             yang akan diselesaikan                                                                    Deferred tax liabilities to be settled
             setelah 12 bulan                      149,343                        156,697                               after 12 months

           Total                                   156,738                        163,410                                              Total

      f.   Administrasi                                                      f.        Administration

           Berdasarkan undang-undang perpajakan yang                                  Under the taxation laws of Indonesia,
           berlaku di Indonesia, perusahaan-perusahaan                                companies within the Group that are domiciled
           di dalam Grup yang berdomisili di Indonesia                                in Indonesia, calculate and pay tax on the
           menghitung dan membayar sendiri besarnya                                   basis of self assessment. The DGT may
           jumlah pajak yang terutang. DJP dapat                                      assess or amend taxes within five years from
           menetapkan atau mengubah pajak dalam batas                                 when the tax becomes due.
           waktu lima tahun sejak saat terutangnya pajak.

      g.   Surat ketetapan pajak                                             g.       Tax assessment letters

           Berikut ini adalah ringkasan dari surat ketetapan                          Set out below is a summary of the tax
           pajak Grup yang masih belum selesai                                        assessment letters received by the Group for
           statusnya:                                                                 which the status has not yet been completed:

                                                                                                            Jumlah yang
                                                           Surat ketetapan           Tanggal surat         diperkarakan
                                                                pajak/              ketetapan pajak/      dalam Dolar AS/
              Entitas/    Jenis pajak/   Tahun pajak/      Tax assessment             Date of tax         Dispute amount
               Entity      Tax type       Fiscal year           letter             assessment letter       in US Dollars          Status


                                                                                                                               Peninjauan
                             PPh                            Lebih bayar/                21 Mei/                                  kembali/
               SIS         Badan/CIT        2016            Overpayment                May 2019                1,070          Judicial review
Page 131
                                      PT ADARO ENERGY INDONESIA Tbk
                                 DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                               Lampiran 5/119 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                   NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                         FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                     30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                                  (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                           unless otherwise stated)

33.   PERPAJAKAN (lanjutan)                                     33.   TAXATION (continued)

      g.   Surat ketetapan pajak (lanjutan)                           g.        Tax assessment letters (continued)

           Audit pajak Grup                                                     Tax audits of the Group

           Sampai dengan tanggal laporan keuangan                               As at the completion date of these interim
           konsolidasian interim ini diterbitkan, ASL, BGN,                     consolidated financial statements, ASL, BGN,
           MSW, AJI, AWP, MBP, MIP, AMI, LSA, PCS,                              MSW, AJI, AWP, MBP, MIP, AMI, LSA, PCS,
           ATA, LC, SCM, SIS dan IBT sedang diaudit DJP                         ATA, LC, SCM, SIS and IBT are being audited
           berkaitan dengan semua jenis pajak untuk                             by the DGT for all types of taxes for fiscal year
           tahun pajak 2022. Entitas-entitas ini belum                          2022. These entities have not yet received the
           menerima      hasil   audit     pajak    tersebut.                   tax audit results. Management is of the
           Manajemen berpendapat bahwa hasil audit                              opinion that the tax audit results will not have
           pajak tersebut tidak akan berdampak material                         a material impact on the Group’s interim
           terhadap laporan keuangan konsolidasian                              consolidated financial statements.
           interim Grup.

      h.   Tarif pajak                                                h.       Tax rates

           Perusahaan Terbuka yang memenuhi syarat-                             Publicly Listed Companies that fulfil certain
           syarat tertentu dapat memperoleh tarif 3% lebih                      requirements are entitled to obtain a rate 3%
           rendah dari tarif PPh Badan yang berlaku.                            lower than the applicable CIT rate. In the
           Dalam hal Perusahaan memenuhi syarat-syarat                          event that the Company fulfils the
           tersebut, Perusahaan dapat memperoleh tarif                          requirements, the Company can obtain a
           PPh Badan lebih rendah untuk Tahun Pajak                             lower CIT rate for the relevant Fiscal Year.
           yang bersangkutan.

           Beban pajak penghasilan kini untuk AI                                The current income tax charge for AI was
           berdasarkan tarif pajak sebesar 45%                                  calculated based on the tax rate of 45% as
           sebagaimana yang diatur dalam PKP2B, dan                             stipulated in the CCA, up to the end of the
           berlaku sampai dengan akhir tahun pajak 2022                         2022 fiscal year as stipulated in the IUPK for
           sebagaimana diatur dalam IUPK sebagai                                the Continuation of Contract/Agreement
           Kelanjutan Operasi Kontrak/Perjanjian. Sejak                         Operation. Starting from 1 January 2023, the
           tanggal 1 Januari 2023, beban pajak                                  current income tax charge is calculated based
           penghasilan kini dihitung berdasarkan Undang-                        on the tax laws issued as at the reporting
           Undang Perpajakan yang berlaku pada tanggal                          date.
           pelaporan.

           Saldo pajak tangguhan telah dievaluasi kembali                       Deferred tax balances were re-evaluated as
           pada tanggal 31 Desember 2022 sesuai tarif                           of 31 December 2022 at the current prevailing
           PPh badan yang berlaku saat ini sebesar 22%,                         CIT rate of 22%, expected to apply to AI under
           diharapkan untuk berlaku pada AI sesuai IUPK                         its   IUPK     for  the    Continuation     of
           sebagai Kelanjutan Operasi Kontrak/Perjanjian                        Contract/Agreement Operation.
           miliknya.
Page 132
                                      PT ADARO ENERGY INDONESIA Tbk
                                 DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                             Lampiran 5/120 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                  30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                               (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                        unless otherwise stated)

34.   TRANSAKSI         DAN   SALDO     DENGAN     PIHAK     34.   TRANSACTIONS    AND              BALANCES        WITH
      BERELASI                                                     RELATED PARTIES

      a.    Sifat hubungan                                         a.       Nature of relationships

                      Pihak berelasi/                  Sifat hubungan/                          Jenis transaksi/
                      Related parties               Nature of relationships                   Type of transactions

            PT Adaro Strategic Investments    Pemegang saham mayoritas/                Setoran modal/
                                                 Majority shareholder                      Paid-up capital
            TPI                               Ventura bersama/joint venture            Penjualan batubara, jasa
                                                                                           manajemen dan pinjaman
                                                                                           untuk pihak berelasi/
                                                                                           Sales of coal,
                                                                                           management fees
                                                                                           and loans to related parties
            BPI                               Ventura bersama/joint venture            Penjualan batubara, jasa
                                                                                           manajemen dan pinjaman
                                                                                           untuk pihak berelasi/
                                                                                           Sales of coal,
                                                                                           management fees
                                                                                           and loans to related parties
            DTP                               Ventura bersama/joint venture            Jasa manajemen dan pinjaman
                                                                                           untuk pihak berelasi/
                                                                                           Management fees and
                                                                                           loans to related parties
            BEP                               Ventura bersama/joint venture            Jasa manajemen/
                                                                                           Management fees
            Kestrel                           Ventura bersama/joint venture            Piutang lain-lain/
                                                                                           Other receivables
            GTM                               Ventura bersama/joint venture            Pinjaman untuk pihak berelasi/
                                                                                           Loans to related parties
            Personil manajemen kunci/         Direktur dan Komisaris Grup/             Kompensasi/Compensation
             Key management personnel             Directors and Commissioners
                                                  of the Group

      b.   Rincian transaksi dan saldo                             b.        Details of transactions and balances

           Dalam kegiatan usahanya, Grup mengadakan                          In the normal course of business, the Group
           transaksi dengan pihak-pihak berelasi, terutama                   engages in transactions with related parties,
           meliputi transaksi-transaksi pembelian barang                     primarily consisting of purchases of goods
           dan jasa dan transaksi keuangan lainnya.                          and services and other financial transactions.

                                         30 September         31 Desember/
                                             2023            December 2022

           Piutang usaha (Catatan 7a)                                                         Trade receivables (Note 7a)

           Penjualan batubara:                                                                              Sales of coal:
             BPI                                  27,518                42,085                                     BPI
             TPI                                  26,811                20,639                                      TPI

           Jasa sewa:                                                                                     Rental services:
              TPI                                       8                     -                                     TPI

           Jasa manajemen:                                                                             Management fees:
              BPI                                    312                   558                                   BPI
              TPI                                     62                    36                                   TPI
              DTP                                     45                    26                                  DTP
              BEP                                      5                     3                                  BEP

           Total                                  54,761                63,347                                      Total

           Persentase terhadap                                                                       As a percentage of
             total aset konsolidasian             0.53%                  0.59%              total consolidated assets
Page 133
                                       PT ADARO ENERGY INDONESIA Tbk
                                  DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                Lampiran 5/121 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                 30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                              (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                       unless otherwise stated)

34.   TRANSAKSI DAN SALDO                   DENGAN     PIHAK    34.   TRANSACTIONS    AND     BALANCES               WITH
      BERELASI (lanjutan)                                             RELATED PARTIES (continued)

      b.   Rincian transaksi dan saldo (lanjutan)                     b.       Details of transactions and balances
                                                                               (continued)

                                             30 September        31 Desember/
                                                 2023           December 2022

           Piutang lain-lain (Catatan 7b)                                                      Other receivables (Note 7b)

           BPI                                        23,428               16,016                                      BPI
           DTP                                            64                  100                                     DTP
           GTM                                            31                    -                                    GTM
           Kestrel                                         -                1,440                                   Kestrel
           TPI                                             -                    1                                      TPI

           Total                                      23,523               17,557                                    Total

           Dikurangi: bagian lancar                      95                 1,544                   Less: current portion

           Bagian tidak lancar                        23,428               16,013                    Non-current portion

           Persentase terhadap                                                                         As a percentage of
             total aset konsolidasian                 0.23%                0.16%              total consolidated assets

           Pinjaman untuk pihak
              berelasi                                                                             Loans to related parties

           BPI                                       140,594           140,594                                         BPI
           GTM                                         1,198                 -                                        GTM
           DTP                                             -             3,059                                        DTP

           Total                                     141,792           143,653                                       Total

           Dikurangi: bagian lancar                         -               3,059                   Less: current portion

           Bagian tidak lancar                       141,792           140,594                       Non-current portion

           Persentase terhadap                                                                         As a percentage of
             total aset konsolidasian                 1.36%                1.33%              total consolidated assets

           Pada tanggal 25 Mei 2021, AP menandatangani                      On 25 May 2021, AP entered into a Shareholder
           Perjanjian Pinjaman Pemegang Saham dengan                        Loan Agreement with BPI to provide a
           BPI untuk memberikan pinjaman kepada BPI                         US$140,594 loan facility to BPI. This loan
           sebesar AS$140.594. Perjanjian pinjaman ini                      agreement is in line with the Equity Support
           sesuai dengan Perjanjian Dukungan Ekuitas                        Agreement dated 3 June 2016 in respect of the
           tertanggal 3 Juni 2016 terkait proyek Central                    Central Java Power Plant (“CJPP”) project (Note
           Java Power Plant (“CJPP”) (Catatan 39u) yang                     39u) as signed by among others AP (as
           ditandatangani antara lain oleh AP (sebagai                      Shareholder), the Company (as Sponsor),
           Pemegang Saham), Perusahaan (sebagai                             Mizuho Bank, Ltd (as Global Facilities Agent)
           Sponsor), Mizuho Bank, Ltd (sebagai Agen                         and MUFG Bank Ltd (as Offshore Security
           Fasilitas Global) dan MUFG Bank Ltd (sebagai                     Agent).
           Agen Jaminan Luar Negeri).
Page 134
                                      PT ADARO ENERGY INDONESIA Tbk
                                 DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                             Lampiran 5/122 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                 NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                       FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                   30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                                (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                         unless otherwise stated)

34.   TRANSAKSI DAN SALDO              DENGAN       PIHAK    34.    TRANSACTIONS    AND      BALANCES                 WITH
      BERELASI (lanjutan)                                           RELATED PARTIES (continued)

      b.   Rincian transaksi dan saldo (lanjutan)                   b.    Details of      transactions     and    balances
                                                                          (continued)

           Pinjaman yang diberikan oleh AP tersebut tidak                  The loan provided by AP has no maturity date.
           memiliki tanggal jatuh tempo, namun dapat                       However, it may be repaid at any time at AP’s
           dilunasi kapan saja atas permintaan AP atau                     request or at the option of BPI, provided certain
           opsi BPI, selama kewajiban-kewajiban keuangan                   financial covenants under senior financing
           tertentu berdasarkan dokumen pembiayaan                         documents of BPI have been fulfilled. The loan
           senior BPI sudah terpenuhi. Pinjaman dimaksud                   bears interest at a certain percentage per
           dikenakan bunga dengan persentase tertentu                      annum. This facility is not bound by any
           per tahun. Fasilitas ini tidak terikat dengan                   collateral.
           jaminan apapun.

           Manajemen      Grup    berpendapat   bahwa                      The Group’s management is of the opinion that
           penurunan nilai atas pinjaman untuk pihak                       the impairment of loans to related parties as at
           berelasi pada tanggal 30 September 2023 dan                     30 September 2023 and 31 December 2022 is
           31 Desember 2022 tidak material sehingga                        not material. Therefore, provision for ECL is not
           cadangan kerugian kredit ekspektasian tidak                     considered necessary.
           diperlukan.

           Lihat Catatan 42(2) untuk informasi nilai wajar                 Refer to Note 42(2) for information on the fair
           dari pinjaman untuk pihak berelasi pada tanggal                 value of loans to related parties as at
           30 September 2023 dan 31 Desember 2022.                         30 September 2023 and 31 December 2022.

                                                    30 September
                                             2023                  2022

           Pendapatan usaha
             (Catatan 29)                                                                                Revenue (Note 29)

           Penjualan batubara:                                                                                Sales of coal:
              BPI                               124,767                  24,463                                      BPI
              TPI                                21,080                  19,593                                      TPI

           Jasa sewa:                                                                                      Rental services:
              TPI                                       8                      -                                     TPI

           Lain-lain:                                                                                               Others:
              BPI                                     800                   755                                      BPI
              TPI                                     251                   251                                      TPI
              BEP                                      24                    26                                     BEP
              DTP                                      19                    25                                     DTP

           Total                                146,949                  45,113                                       Total

           Persentase terhadap total
             pendapatan usaha                                                                         As a percentage of
             konsolidasian                          2.95%                 0.76%             total consolidated revenue
Page 135
                                      PT ADARO ENERGY INDONESIA Tbk
                                 DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                            Lampiran 5/123 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                 NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                       FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                   30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                                (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                         unless otherwise stated)

34.   TRANSAKSI DAN SALDO              DENGAN       PIHAK    34.    TRANSACTIONS    AND      BALANCES                 WITH
      BERELASI (lanjutan)                                           RELATED PARTIES (continued)

      b.   Rincian transaksi dan saldo (lanjutan)                   b.      Details of     transactions    and    balances
                                                                            (continued)

                                                    30 September
                                            2023                   2022

           Penghasilan keuangan                                                                            Finance income

           BPI                                       7,463                7,463                                        BPI
           DTP                                         150                  221                                       DTP
           GTM                                          32                    -                                       GTM
           TPI                                           -                   12                                        TPI

           Total                                     7,645                7,696                                       Total

           Persentase terhadap total
             penghasilan keuangan                                                               As a percentage of total
             konsolidasian                          7.83%                33.30%           consolidated finance income

           Kebijakan harga Grup untuk transaksi dengan                      The Group’s pricing policy for transactions with
           pihak berelasi ditetapkan berdasarkan pada                       related parties is set based on contracted
           harga di dalam kontrak.                                          prices.

      c.   Kompensasi manajemen kunci                               c.      Key management compensation

           Dewan Komisaris dan Direksi Grup merupakan                       The Boards of Commissioners and Directors of
           personil manajemen kunci.                                        the Group are considered key management
                                                                            personnel.

           Kompensasi untuk Dewan Komisaris dan Direksi                     The compensation for the Boards of
           Grup untuk periode sembilan bulan yang                           Commissioners and Directors of the Group for
           berakhir pada tanggal 30 September 2023 dan                      the nine-month periods ended 30 September
           2022, adalah sebagai berikut:                                    2023 and 2022, was as follows:

                                                    30 September
                                            2023                   2022

           Remunerasi                               28,764               21,628                            Remuneration
           Imbalan pasca kerja                         853                  822                  Post-employment benefits

           Total                                    29,617               22,450                                       Total

           Dewan Komisaris dan Direksi tidak menerima                       The Boards of Commissioners and Directors do
           kompensasi lain seperti rencana opsi saham                       not receive any other compensation such as
           manajemen.                                                       management stock options.
Page 136
                                             PT ADARO ENERGY INDONESIA Tbk
                                        DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                          Lampiran 5/124 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                           NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                 FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                                             30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                                                          (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                                                   unless otherwise stated)

35. LABA PER SAHAM DASAR DAN DILUSIAN                                            35.           BASIC AND DILUTED EARNINGS PER SHARE

                                                                 30 September
                                                          2023                          2022

      Laba konsolidasian periode
        berjalan yang dapat                                                                                                 Consolidated profit for the period
        diatribusikan kepada                                                                                                    attributable to the owners
        pemilik entitas induk                              1,218,898                      1,903,401                                     of the parent entity
      Rata-rata tertimbang jumlah
        saham biasa yang beredar                                                                                                Weighted average number of
        (dalam ribuan                                                                                                          ordinary shares outstanding
        lembar saham)                                     30,929,593                    31,090,021                                 (in thousands of shares)

      Laba per saham dasar                                                                                                        Basic earnings per share
        yang dapat diatribusikan                                                                                               attributable to the owners
        kepada pemilik entitas                                                                                                        of the parent entity
        induk (nilai penuh)                                   0.03941                          0.06122                                       (full amount)

      Perusahaan tidak memiliki efek berpotensi dilusi                                         The Company does not have any potentially dilutive
      saham sehingga laba per saham dasar sama dengan                                          shares. Therefore, the diluted earnings per share is
      laba per saham dilusian.                                                                 equal to the basic earnings per share.


36.   ASET DAN LIABILITAS MONETER NETO DALAM                                     36.           NET MONETARY ASSETS AND LIABILITIES
      MATA UANG ASING                                                                          DENOMINATED IN FOREIGN CURRENCIES

      Pada tanggal 30 September 2023 dan 31 Desember                                           As at 30 September 2023 and 31 December 2022,
      2022, Grup memiliki aset dan liabilitas moneter dengan                                   the Group had monetary assets and liabilities
      mata uang selain Dolar AS sebagai berikut:                                               denominated in currencies other than US Dollars as
                                                                                               follows:
                                                                              30 September 2023
                                                                                                                            Jumlah setara
                                                                                                                          ribuan Dolar AS/
                                                                S$                  Euro                    A$                Equivalent
                                        Dalam/in          (nilai penuh/        (nilai penuh/          (nilai penuh/          in thousand
                                         Rp’000           full amount)         full amount)           full amount)          of US Dollars

      Aset moneter                                                                                                                                     Monetary assets
      Kas dan setara kas                5,683,373,709         3,553,506                 1,593               827,290                369,189     Cash and cash equivalents
      Piutang usaha                     2,594,191,043                 -                     -                     -                167,087             Trade receivables
      Pajak dibayar dimuka              1,175,101,060                 -                     -                     -                 75,685                 Prepaid taxes
      Pajak yang bisa dipulihkan
         kembali                          608,409,242                     -                    -                      -             39,186             Recoverable taxes
      Deposito berjangka yang                                                                                                                        Restricted cash time
         dibatasi penggunaannya           102,463,890                     -                    -                      -              6,599                      deposits
      Investasi lain-lain                 815,299,536                     -                    -                      -             52,514             Other investments
      Pinjaman untuk pihak ketiga       2,543,838,117                     -                    -                      -            163,844          Loans to third parties
      Pinjaman untuk pihak berelasi        18,600,000                     -                    -                      -              1,198        Loans to related parties
                                                                                                                                                      Service concession
      Piutang jasa konsesi                364,906,072                     -                    -                      -             23,503                   receivables
      Aset tidak lancar lain-lain           5,509,726                     -                    -                      -                356       Other non-current assets

      Total                            13,911,692,395         3,553,506                 1,593               827,290                899,161                              Total

      Liabilitas moneter                                                                                                                               Monetary liabilities
      Utang usaha                       (6,042,947,741)           (5,771)                      -              (2,490)              (389,221)              Trade payables
      Beban yang masih harus
         dibayar                        (1,499,555,991)                   -                    -             (66,374)               (96,624)             Accrued expenses
      Utang pajak                         (167,427,128)                   -                    -                   -                (10,784)                 Taxes payable
      Liabilitas imbalan kerja                                                                                                                       Short-term employee
         jangka pendek                     (21,878,982)                   -                    -                      -              (1,409)             benefits liabilities
      Utang lain-lain                      (60,426,905)                   -                    -                      -              (3,892)                 Other liabilities
      Liabilitas imbalan                                                                                                                                  Post-employment
         pasca kerja                    (1,009,132,193)                -                       -                      -             (64,996)             benefits liabilities
      Utang bank                          (224,404,769)       (9,766,300)                      -                      -             (21,610)                     Bank loans
      Liabilitas sewa                     (211,817,351)                -                       -                      -             (13,643)                Lease liabilities
                                                                                                                                                                Provision for
      Provisi pembongkaran,                                                                                                                      decommissioning, mine
         rehabilitasi, reklamasi dan                                                                                                           rehabilitation, reclamation
         penutupan tambang              (2,527,848,189)                   -                    -                      -            (162,814)                   and closure

      Total                            (11,765,439,249)       9,772,071                        -             68,864                764,993                              Total

      Aset neto                         2,146,253,146         (6,218,565)               1,593               758,426                134,168                       Net assets

      Dalam ekuivalen AS$                     138,238             (4,556)                      2                 484               134,168                 US$ equivalent
Page 137
                                            PT ADARO ENERGY INDONESIA Tbk
                                       DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                         Lampiran 5/125 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                         NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                               FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                                           30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                                                        (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                                                 unless otherwise stated)

36.   ASET DAN LIABILITAS MONETER NETO DALAM                                  36.            NET MONETARY ASSETS AND LIABILITIES
      MATA UANG ASING (lanjutan)                                                             DENOMINATED IN FOREIGN CURRENCIES
                                                                                             (continued)

      Pada tanggal 30 September 2023 dan 31 Desember                                         As at 30 September 2023 and 31 December 2022,
      2022, Grup memiliki aset dan liabilitas moneter dengan                                 the Group had monetary assets and liabilities
      mata uang selain Dolar AS sebagai berikut: (lanjutan)                                  denominated in currencies other than US Dollars as
                                                                                             follows: (continued)
                                                                     31 Desember/December 2022
                                                                                                                          Jumlah setara
                                                                                                                        ribuan Dolar AS/
                                                               S$                 Euro                    A$                Equivalent
                                       Dalam/in          (nilai penuh/       (nilai penuh/          (nilai penuh/          in thousand
                                        Rp’000           full amount)        full amount)           full amount)          of US Dollars

      Aset moneter                                                                                                                                   Monetary assets
      Kas dan setara kas                7,012,499,028        1,252,865                1,593               639,554                447,136     Cash and cash equivalents
      Piutang usaha                     3,137,573,864                -                    -                     -                199,452             Trade receivables
      Pajak dibayar dimuka                562,934,321                -                    -                     -                 35,785                  Prepaid taxes
      Deposito berjangka yang                                                                                                                      Restricted cash time
         dibatasi penggunaannya            85,137,381                    -                   -                      -              5,412                      deposits
      Investasi lain-lain               1,228,471,403                    -                   -                      -             78,092             Other investments
      Pinjaman untuk pihak ketiga       2,484,569,992                    -                   -                      -            157,941          Loans to third parties
      Pinjaman untuk pihak berelasi        48,114,247                    -                   -                      -              3,059        Loans to related parties
                                                                                                                                                    Service concession
      Piutang jasa konsesi               299,367,163                     -                   -                      -             19,030                   receivables
      Aset tidak lancar lain-lain          6,282,967                     -                   -                      -                399      Other non-current assets

      Total                            14,864,950,366        1,252,865                1,593               639,554                946,306                              Total

      Liabilitas moneter                                                                                                                             Monetary liabilities
      Utang usaha                      (4,594,799,585)          (31,636)                     -              (3,300)              (292,111)              Trade payables
      Beban yang masih harus
         dibayar                         (988,611,399)       (1,039,005)                     -             (35,988)               (63,639)             Accrued expenses
      Utang pajak                        (189,636,879)                -                      -                   -                (12,055)                 Taxes payable
      Liabilitas imbalan kerja                                                                                                                     Short-term employee
         jangka pendek                    (15,906,737)                   -                   -                      -              (1,011)             benefits liabilities
      Utang lain-lain                     (64,725,703)                   -                   -                      -              (4,115)                 Other liabilities
      Liabilitas imbalan                                                                                                                                Post-employment
         pasca kerja                     (932,656,541)               -                       -                      -             (59,288)             benefits liabilities
      Utang bank                                    -      (10,572,700)                      -                      -              (7,872)                     Bank loans
      Liabilitas sewa                    (148,058,168)               -                       -                      -              (9,411)                Lease liabilities
                                                                                                                                                              Provision for
      Provisi pembongkaran,                                                                                                                    decommissioning, mine
         rehabilitasi, reklamasi dan                                                                                                         rehabilitation, reclamation
         penutupan tambang             (2,251,662,078)                   -                   -                      -            (143,135)                   and closure

      Total                            (9,186,057,090)     (11,643,341)                      -             (39,288)              (592,637)                            Total

      Aset neto                         5,678,893,276      (10,390,476)               1,593               600,266                353,669                       Net assets

      Dalam ekuivalen AS$                    361,000             (7,737)                     2                 404               353,669                 US$ equivalent


      Aset dan liabilitas moneter di atas dijabarkan                                         The monetary assets and liabilities mentioned above
      menggunakan kurs penutupan Bank Indonesia tanggal                                      are translated using the Bank Indonesia closing rate
      30 September 2023 dan 31 Desember 2022.                                                as at 30 September 2023 and 31 December 2022.

      Apabila aset dan liabilitas dalam mata uang selain                                     If assets and liabilities in currencies other than
      Dolar AS pada tanggal 30 September 2023 dijabarkan                                     US Dollars as at 30 September 2023 are translated
      dengan menggunakan kurs yang berlaku pada tanggal                                      using the exchange rate as at the date of completion
      penyelesaian laporan keuangan konsolidasian interim                                    of these interim consolidated financial statements,
      ini, aset moneter neto akan turun sekitar AS$3.586.                                    the total net monetary assets will decrease by
                                                                                             approximately US$3,586.
Page 138
                                                 PT ADARO ENERGY INDONESIA Tbk
                                            DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                           Lampiran 5/126 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                     NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                           FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                                       30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                                                    (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                                             unless otherwise stated)

37.    INFORMASI ARUS KAS                                                           37.     CASH FLOW INFORMATION

       a. Transaksi non-kas                                                                 a.      Non-cash transactions

           Tabel dibawah ini menunjukkan transaksi non-kas                                          The table below shows the Group’s non-cash
           Grup selama periode berjalan sebagai berikut:                                            transactions during the period as follows:

                                                                     30 September
                                                            2023                          2022

            Aktivitas yang tidak
              mempengaruhi arus kas:                                                                                                  Non-cash activities:
            Perolehan aset tetap                                                                                                  Acquisition of fixed assets
              melalui liabilitas sewa                                53,327                      23,625                                      under leases
            Penambahan aset tetap
              melalui beban yang masih                                                                                               Additions of fixed assets
              harus dibayar                                          17,695                       2,357                                    through accruals
            Penambahan aset tetap
              dan properti pertambangan                                                                                           Additions of fixed assets
              dari kapitalisasi biaya                                                                                    and mining properties through
              pinjaman                                                1,102                         435                capitalisation of borrowing costs
            Pendapatan bunga yang
             diakumulasikan                                                                                               Interest income accumulated to
              ke pokok pinjaman                                          46                         216                                   loan principal
            Penambahan kas dan
              deposito berjangka yang
              dibatasi penggunaannya                                                                             Additions of restricted cash and time
             melalui bunga roll-over                                   362                          112         deposits through roll-over of interest
            Penambahan/(pengurangan)
              aset tetap dan properti                                                                                 Addition/(deduction) of fixed assets
              pertambangan melalui                                                                                      and mining properties through
              provisi pembongkaran,                                                                                    provision for decommissioning,
              rehabilitasi, reklamasi                                                                                  mine rehabilitation, reclamation
              dan penutupan tambang                                    323                          (397)                                   and closure
            Penambahan properti
              pertambangan melalui                                                                                          Additions of mining properties
              reklasifikasi aset tetap                                     -                      9,338              from reclassification of fixed assets

      b.   Rekonsiliasi liabilitas               yang     timbul        dari                b.      Reconciliation of liabilities arising from
           aktivitas pendanaan                                                                      financing activities

           Tabel dibawah ini menunjukkan rekonsiliasi                                               The tables below set out a reconciliation of
           liabilitas yang timbul dari aktivitas pendanaan                                          liabilities arising from financing activities for the
           untuk periode sembilan bulan yang berakhir pada                                          nine-month periods ended 30 September 2023
           tanggal 30 September 2023 dan 2022 sebagai                                               and 2022 as follows:
           berikut:
                                                                        Perubahan non-kas/Non-cash changes
                                                                                    Pergerakan
                                                                                     kurs mata
                                                                                    uang asing/
                                                                         Akresi       Foreign                            Saldo
                                        Saldo awal/                      bunga/      exchange        Sewa                akhir/
                                        Beginning      Arus kas/        Interest        rate         baru/              Ending
                                         balance      Cash flows       accretion    movement      New leases            balance

           30 September 2023                                                                                                                    30 September 2023
           Liabilitas sewa                   67,650       (28,106)              -             13            53,327         92,884                    Lease liabilities
           Utang bank                       810,849        55,617           5,171           (595)                -        871,042                        Bank loans
           Senior Notes                     700,890        (7,030)          2,496              -                 -        696,356                      Senior Notes
           Pinjaman dari pihak ketiga         3,256        (3,256)              -              -                 -              -            Loans from third parties

           Total                          1,582,645       17,225            7,667           (582)           53,327       1,660,282                              Total
Page 139
                                                     PT ADARO ENERGY INDONESIA Tbk
                                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                                   Lampiran 5/127 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                   NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                         FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                                                     30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                                                                  (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                                                           unless otherwise stated)

37.   INFORMASI ARUS KAS (lanjutan)                                                              37. CASH FLOW INFORMATION (continued)

      b.     Rekonsiliasi liabilitas yang                         timbul         dari                     b. Reconciliation of liabilities arising from
             aktivitas pendanaan (lanjutan)                                                                  financing activities (continued)
                                                                                 Perubahan non-kas/Non-cash changes
                                                                                             Pergerakan
                                                                                              kurs mata
                                                                                             uang asing/
                                                                                  Akresi       Foreign                                    Saldo
                                            Saldo awal/                           bunga/      exchange        Sewa                        akhir/
                                            Beginning         Arus kas/          Interest        rate         baru/                      Ending
                                             balance         Cash flows         accretion    movement      New leases                    balance

             30 September 2022                                                                                                                                       30 September 2022
             Liabilitas sewa                     94,036          (40,672)                -                (587)           23,625            76,402                        Lease liabilities
             Utang bank                         769,565           74,085             4,980                   -                 -           848,630                            Bank loans
             Senior Notes                       740,118          (19,927)            2,674                   -                 -           722,865                          Senior Notes
             Pinjaman dari pihak ketiga           3,614             (358)                -                   -                 -             3,256                Loans from third parties

             Total                            1,607,333           13,128             7,654                (587)           23,625         1,651,153                                   Total




38.   SEGMEN OPERASI                                                                             38.     OPERATING SEGMENTS

      Manajemen telah menentukan segmen operasi                                                          Management has determined the operating
      berdasarkan laporan yang ditelaah oleh Direksi, yang                                               segments based on reports reviewed by the Board
      telah diidentifikasikan sebagai pengambil keputusan                                                of Directors, which has been identified as the
      operasional utama Grup, dalam mengambil keputusan                                                  Group’s chief operating decision maker, which
      strategis.                                                                                         makes strategic decisions.

      Direksi mempertimbangkan operasi bisnis dari                                                       The Board of Directors considers the business
      perspektif jenis bisnis yang terdiri dari pertambangan                                             operation from a business type perspective, which
      dan perdagangan batubara, jasa pertambangan,                                                       comprises coal mining and trading, mining services,
      logistik dan lain-lain (pembangkit listrik, manajemen                                              logistics and others (power plant, asset
      aset dan sebagainya).                                                                              management, etc.).

      Informasi segmen yang diberikan kepada Direksi untuk                                               The segment information provided to the Board of
      pelaporan segmen adalah sebagai berikut:                                                           Directors for the reportable segments is as follows:

                                                                                    30 September 2023
                                          Pertambangan
                                               dan
                                          perdagangan            Jasa
                                            batubara/       pertambangan/
                                           Coal mining          Mining           Logistik/         Lain-lain/          Eliminasi/         Konsolidasi/
                                           and trading         services          Logistics          Others            Eliminations        Consolidated

      Pendapatan di luar segmen               4,837,034            98,752             35,125             10,185                      -         4,981,096                 External revenue
      Pendapatan antar                                                                                                                                                      Inter-segment
        segmen                                    2,203           688,013            352,560             89,994          (1,132,770)                      -                   revenue

      Pendapatan usaha                        4,839,237           786,765            387,685            100,179          (1,132,770)           4,981,096                         Revenue

      Beban pokok pendapatan                  (3,230,627)         (636,358)          (180,793)           (29,262)         1,083,715           (2,993,325)                 Cost of revenue

      Beban penjualan dan                                                                                                                                           Selling and marketing
        pemasaran                               (82,142)                    -                -                    -                  -              (82,142)                 expenses

      Beban umum dan                                                                                                                                                          General and
        administrasi                           (175,025)           (28,823)           (21,613)           (63,694)            38,893                (250,262)   administrative expenses

      Biaya keuangan                            (77,000)           (25,373)              (137)           (64,455)            85,536                 (81,429)                Finance costs

      Penghasilan keuangan                      105,831              3,208              4,291            65,961             (81,653)                97,638                Finance income

      Beban pajak penghasilan                  (297,248)           (22,157)             (4,848)          (14,670)             6,591                (332,332)         Income tax expense

      Laba periode berjalan                   1,086,248            73,093            185,159             37,235              (3,901)           1,377,834              Profit for the period

      Penyusutan dan                                                                                                                                                     Depreciation and
        amortisasi                              (54,956)          (123,189)           (25,669)           (11,913)           (12,812)               (228,539)              amortisation

      30 September 2023                                                                                                                                              30 September 2023

      Aset segmen                             5,247,952          1,020,206           609,184           3,838,840           (321,720)          10,394,462                  Segment assets

      Liabilitas segmen                       2,543,334           697,777             69,688           1,307,473         (1,634,414)           2,983,858               Segment liabilities
Page 140
                                            PT ADARO ENERGY INDONESIA Tbk
                                       DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                          Lampiran 5/128 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                       NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                             FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                                         30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                                                      (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                                               unless otherwise stated)

38. SEGMEN OPERASI (lanjutan)                                                      38.        OPERATING SEGMENTS (continued)

   Informasi segmen yang diberikan kepada Direksi untuk                                       The segment information provided to the Board of
   pelaporan segmen adalah sebagai berikut: (lanjutan)                                        Directors for the reportable segments is as follows:
                                                                                              (continued)
                                                                         30 September 2022
                                 Pertambangan
                                      dan
                                 perdagangan            Jasa
                                   batubara/       pertambangan/
                                  Coal mining          Mining          Logistik/         Lain-lain/        Eliminasi/        Konsolidasi/
                                  and trading         services         Logistics          Others          Eliminations       Consolidated


     Pendapatan di luar segmen       5,792,775            83,836            27,667             8,871                     -        5,913,149              External revenue
     Pendapatan antar                                                                                                                                       Inter-segment
       segmen                            3,134           543,127           267,280           78,424            (891,965)                    -                 revenue

     Pendapatan usaha                5,795,909           626,963           294,947           87,295            (891,965)          5,913,149                       Revenue

     Beban pokok pendapatan          (2,682,759)         (537,520)         (129,297)         (24,879)           826,357          (2,548,098)              Cost of revenue

     Beban penjualan dan                                                                                                                             Selling and marketing
       pemasaran                        (90,379)                -                  -                  -                  -          (90,379)                  expenses

     Beban umum dan                                                                                                                                            General and
       administrasi                     (77,776)          (23,960)          (15,631)         (62,205)            38,130            (141,442)    administrative expenses

     Biaya keuangan                     (60,784)          (16,657)             (223)         (46,624)            62,033             (62,255)                Finance costs

     Penghasilan keuangan               38,051              1,606             2,770          34,148             (53,462)             23,113               Finance income

     Beban pajak penghasilan         (1,142,427)          (14,004)           (4,004)         (14,723)            10,103          (1,165,055)          Income tax expense

     Laba periode berjalan           1,785,954            36,882           147,031          206,459              (7,788)          2,168,538            Profit for the period

     Penyusutan dan                                                                                                                                      Depreciation and
       amortisasi                     (279,497)          (104,577)          (23,125)         (10,091)           (29,275)           (446,565)              amortisation

     30 September 2022                                                                                                                                30 September 2022

     Aset segmen                     5,942,952           958,281           587,017        3,562,647          (1,019,034)         10,031,863               Segment assets

     Liabilitas segmen               3,554,377           709,810            54,157        1,770,502          (2,345,664)          3,743,182             Segment liabilities


   Mayoritas aset tidak lancar Grup berada di Indonesia.                                      The majority of the Group’s non-current assets are
                                                                                              located in Indonesia.

   Penjualan berdasarkan tujuan adalah sebagai berikut:                                       Sales by destination were as follows:

                                                                     30 September
                                                          2023                            2022

    Domestik                                                   882,375                         744,358                                                    Domestic
    Ekspor                                                                                                                                                   Export
      - Cina                                                   973,404                         605,026                                                    China -
      - Malaysia                                               804,045                         899,092                                                Malaysia -
      - India                                                  567,095                         839,981                                                     India -
      - Jepang                                                 483,004                         694,661                                                   Japan -
      - Korea                                                  453,193                         426,296                                                    Korea -
      - Filipina                                               394,097                         414,218                                              Philippines -
      - Hongkong                                               170,005                         434,682                                              Hong Kong -
      - Taiwan                                                 142,476                         571,511                                                  Taiwan -
      - Lain-lain                                              111,402                         283,324                                                   Others -

    Total                                                   4,981,096                       5,913,149                                                             Total

   Penjualan antar segmen dilakukan berdasarkan pada                                          Sales between segments are carried out at
   harga di dalam kontrak. Pendapatan dari pihak                                              contracted prices. The revenue from external parties
   eksternal yang dilaporkan kepada Direksi diukur dengan                                     reported to the Board of Directors is measured in a
   cara yang sama sebagaimana disampaikan pada laba                                           manner consistent with that presented in profit or
   rugi.                                                                                      loss.

   Jumlah yang dilaporkan kepada Direksi sehubungan                                           The amounts provided to the Board of Directors with
   dengan jumlah aset dan liabilitas diukur dengan cara                                       respect to total assets and liabilities are measured in
   yang konsisten dengan yang dilaporkan dalam laporan                                        a manner consistent with the reporting in the interim
   posisi keuangan konsolidasian interim.                                                     consolidated statements of financial position.
Page 141
                                   PT ADARO ENERGY INDONESIA Tbk
                              DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                           Lampiran 5/129 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                           NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                 FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                             30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                          (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                   unless otherwise stated)

39. PERJANJIAN       PENTING,        IKATAN,        DAN     39.   SIGNIFICANT AGREEMENTS,            COMMITMENTS
    KONTINJENSI                                                   AND CONTINGENCIES

    a.    Perjanjian penambangan, pengangkutan,                   a.    Coal    mining,    hauling,          barging,
          pemindahan batubara, dan perjanjian                           transhipment    and    other          related
          terkait lainnya                                               agreements

           AI, sebagai produsen batubara, mengadakan                    AI, as a coal producer, has entered into a
          sejumlah perjanjian penambangan batubara.                     number of coal mining agreements. Under the
          Berdasarkan perjanjian-perjanjian tersebut, AI                agreements, AI is required to pay contractors
          diharuskan membayar biaya sewa dan biaya                      a rental fee and a service fee, calculated on a
          jasa kepada kontraktor, dihitung secara                       monthly basis, based on a formula that
          bulanan, berdasarkan rumus yang meliputi                      includes the amount of raw coal transported
          jumlah batubara mentah yang diangkut dan                      and overburden mined and transported. The
          overburden yang ditambang dan diangkut.                       contractors will provide the equipment,
          Kontraktor akan menyediakan sarana, mesin,                    machinery, appliances and other supplies
          perlengkapan, dan barang-barang lain yang                     necessary and also in some instances may
          diperlukan dan dalam kondisi tertentu dapat                   use AI’s own equipment for performing the
          menggunakan peralatan AI sendiri untuk                        mining and transportation services and are
          melakukan       jasa   penambangan        dan                 required to meet certain minimum production
          transportasi, dan diharuskan memenuhi                         requirements.
          persyaratan minimum produksi tertentu.

          AI      juga      mengadakan         perjanjian               AI has also entered into coal barging,
          pengangkutan, transportasi, dan pemindahan                    transport and transhipment agreements with
          batubara      dengan      kontraktor     untuk                contractors to provide coal transportation
          menyediakan jasa transportasi dari wilayah                    services from AI’s main areas to certain port
          utama AI ke pelabuhan tujuan yang telah                       destinations and to provide floating crane
          ditentukan dan menyediakan jasa floating                      services from the contractors’ barge to
          crane dari tongkang kontraktor ke kapal                       customers’ vessels. AI is required to pay
          pelanggan. AI diharuskan membayar biaya                       contractors a service fee, calculated on a
          jasa kepada kontraktor, dihitung secara                       monthly basis, based on a formula that takes
          bulanan, berdasarkan suatu rumus yang                         into account the amount of coal transported.
          meliputi jumlah batubara yang diangkut.

          Pada tanggal 11 September 2015, AI                            On 11 September 2015, AI entered into a fuel
          mengadakan perjanjian penyediaan bahan                        supply agreement with PT Pertamina
          bakar minyak dengan PT Pertamina (Persero)                    (Persero) (“Pertamina”), whereby AI is
          (“Pertamina”),    dimana     AI    diharuskan                 required to pay Pertamina a price, based on a
          membayar kepada Pertamina berdasarkan                         formula that consists of the volume of fuel
          suatu rumus yang meliputi jumlah bahan bakar                  supplied and the market price of fuel, and AI
          minyak yang disediakan dan harga pasar atas                   is required to purchase a minimum annual
          bahan bakar minyak dan AI juga diharuskan                     volume of fuel. This agreement was effective
          membeli jumlah minimum tertentu volume                        from 1 November 2015. This fuel supply
          bahan bakar minyak setiap tahun. Perjanjian                   agreement was amended on 1 December
          ini    berlaku     efektif   pada     tanggal                 2015 regarding changes in the fuel price
          1 November 2015. Perjanjian penyediaan                        formula. Since 16 September 2021, according
          bahan bakar minyak ini telah diubah pada                      to the novation agreement of fuel supply
          tanggal 1 Desember 2015 mengenai                              agreement that has been made and signed by
          perubahan formula harga bahan bakar. Sejak                    and between AI, Pertamina, and PT
          tanggal 16 September 2021, berdasarkan                        Pertamina Patra Niaga, all of the
          perjanjian novasi atas fuel supply agreement                  responsibilities, rights and obligations of
          yang telah dibuat dan ditandatangani oleh dan                 Pertamina under the fuel supply agreement
          antara AI, Pertamina, dan PT Pertamina Patra                  were transferred to PT Pertamina Patra
          Niaga, seluruh tanggung jawab, hak dan                        Niaga. This novation agreement was
          kewajiban Pertamina berdasarkan perjanjian                    amended last by amendment III of the fuel
          penyediaan bahan bakar minyak dialihkan                       supply agreement to extend the term until 31
          kepada PT Pertamina Patra Niaga. Perjanjian                   January 2023 (“FSA”).
          novasi ini diubah terakhir berdasarkan
          amandemen III atas fuel supply agreement
          untuk memperpanjang jangka waktu perjanjian
          sampai dengan 31 Januari 2023 (“FSA”).
Page 142
                                        PT ADARO ENERGY INDONESIA Tbk
                                   DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                  Lampiran 5/130 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                         NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                               FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                           30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                                        (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                                 unless otherwise stated)

39.   PERJANJIAN      PENTING,             IKATAN,          DAN        39.     SIGNIFICANT AGREEMENTS, COMMITMENTS
      KONTINJENSI (lanjutan)                                                   AND CONTINGENCIES (continued)

      a.   Perjanjian penambangan, pengangkutan,                                a.       Coal     mining,    hauling,            barging,
           pemindahan batubara, dan perjanjian                                           transhipment     and    other            related
           terkait lainnya (lanjutan)                                                    agreements (continued)

           Pada tanggal 31 Januari 2023, AI                                              On 31 January 2023, AI entered into a new
           mengadakan perjanjian penyediaan bahan                                        fuel supply agreement with PT Pertamina
           bakar minyak baru dengan PT Pertamina                                         Patra Niaga which continues the cooperation
           Patra Niaga yang melanjutkan kerjasama                                        between AI and PT Pertamina Patra Niaga
           antara AI dengan PT Pertamina Patra Niaga                                     previously stated in the FSA. This fuel supply
           yang sebelumnya tertuang dalam FSA.                                           agreement has a period until 30 September
           Perjanjian penyediaan bahan bakar ini                                         2029.
           mempunyai jangka waktu sampai dengan 30
           September 2029.

              Kontraktor/                   Tipe perjanjian/                   Tanggal perjanjian/          Akhir periode perjanjian/
               Contractor                   Agreement type                      Agreement date                Contract period end
           PT Bukit Makmur         Jasa pengupasan lapisan tanah dan              6 April 2010            30 September 2022 atau pada
             Mandiri Utama           jasa penambangan/Stripping of                                          saat cadangan batubara di
                                      overburden and mining of coal                                       Paringin (berdasarkan laporan
                                                                                                          JORC) telah habis, mana yang
                                                                                                                   lebih dahulu/
                                                                                                               30 September 2022
                                                                                                           or when the coal reserves at
                                                                                                                    Paringin pit
                                                                                                         (according to the relevant JORC
                                                                                                           report) have been depleted,
                                                                                                               whichever is earlier*
           PT Mitrabahtera              Pengangkutan batubara/                        1 Oktober/               30 September 2024
             Segara Sejati                   Coal barging                            October 2010
             Tbk
           Pertamina-PT                 Penyediaan bahan bakar/                 11 September 2015           31 Januari/January 2023
             Pertamina Patra                  Fuel supply
             Niaga
           PT Pertamina                 Penyediaan bahan bakar/              31 Januari/January 2023           30 September 2029
             Patra Niaga                      Fuel supply
           PT Bukit Makmur                Sewa peralatan berat/                 28 September 2012         30 September 2022 atau pada
             Mandiri Utama               Heavy equipment rental                                             saat cadangan batubara di
                                                                                                          Paringin (berdasarkan laporan
                                                                                                          JORC) telah habis, mana yang
                                                                                                                   lebih dahulu/
                                                                                                               30 September 2022
                                                                                                            or when the coal reserves
                                                                                                                  at Paringin pit
                                                                                                         (According to the relevant JORC
                                                                                                           report) have been depleted,
                                                                                                               whichever is earlier*
           PT Bukit Makmur         Jasa pertambangan/Mining services             29 Juni/June 2021             31 Desember 2025,
             Mandiri Utama                                                                                          bergantung
                                                                                                              pada persyaratan dan
                                                                                                                 ketentuan dalam
                                                                                                                    perjanjian/
                                                                                                                   31 December
                                                                                                                   2025, subject
                                                                                                             to terms and conditions
                                                                                                               under the agreement
           PT Samudera            Kesepakatan untuk mengakses koridor            6 November 2015             Pada akhir PKP2B MC/
             Rejeki Perkasa      jalan/Agreement to access road corridor                                        End of MC’s CCoW
           PT Fortuna Cipta       Kesepakatan untuk mengakses koridor        24 Desember/December         Pada akhir PKP2B LC dan MC/
             Sejahtera           jalan/Agreement to access road corridor              2014                 End of LC and MC’s CCoW
           PT Pada Idi             Perjanjian penggunaan Intermediate           8 Juni/June 2022                   17 April 2024
                                  Stockpile Teluk Timbau/Agreement for
                                  Usage of Intermediate Stockpile Teluk
                                                 Timbau

           *) Tidak akan diperpanjang                                *) Will not be extended
Page 143
                                       PT ADARO ENERGY INDONESIA Tbk
                                  DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                            Lampiran 5/131 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                  30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                               (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                        unless otherwise stated)

39.   PERJANJIAN      PENTING,          IKATAN,       DAN 39.          SIGNIFICANT AGREEMENTS, COMMITMENTS
      KONTINJENSI (lanjutan)                                           AND CONTINGENCIES (continued)

      a.   Perjanjian penambangan, pengangkutan,                       a.   Coal mining, hauling, barging, transhipment
           pemindahan batubara, dan perjanjian                              and other related agreements (continued)
           terkait lainnya (lanjutan)

           Berdasarkan     perjanjian-perjanjian     yang                   Under the agreements made by SIS and third-
           dibuat oleh SIS dan produsen batubara                            party coal producers, SIS provides equipment
           pihak ketiga, SIS menyediakan peralatan                          through a rental mechanism, and provides
           dengan mekanisme sewa dan menyediakan                            mining services for overburden removal and
           jasa pertambangan untuk pemindahan                               hauling. SIS is required to meet a minimum
           dan     pengangkutan      overburden.       SIS                  production level for certain activities. SIS
           diharuskan untuk memenuhi tingkat produksi                       receives a service fee calculated on a monthly
           minimum untuk aktivitas-aktivitas tertentu. SIS                  basis, based on a formula that includes several
           akan menerima imbalan jasa yang dihitung                         adjustment clauses.
           secara bulanan, berdasarkan suatu rumus
           yang meliputi beberapa klausa penyesuaian.

                 Produsen batubara/           Tanggal perjanjian/           Periode kontrak atau tingkat produksi (metrik ton)/
                   Coal producer               Agreement date               Contract period or production level (metric tonne)

           PT Borneo Indobara (Kusan)      23 Februari/February 2012        1 Januari/January 2012 - 31 Desember/December 2023

      b.   Perjanjian Kerjasama Penggunaan Tanah                       b.    Land-Use Cooperation Agreement

           Pada tanggal 4 November 2009, MSW                                 On 4 November 2009, MSW and the
           dan    Pemerintah       Kabupaten   Tabalong                      Government of Tabalong Regency entered
           mengadakan           perjanjian    kerjasama                      into a land-use cooperation agreement, for the
           penggunaan        tanah     milik Pemerintah                      use of 100.2 hectares of the Government of
           Kabupaten Tabalong, seluas 100,2 hektar                           Tabalong Regency’s land, located in Mabu’un
           yang terletak di desa Mabu’un, Kabupaten                          village, Tabalong Regency, South Kalimantan.
           Tabalong, Kalimantan Selatan. Dengan                              Under this land-use cooperation agreement,
           adanya perjanjian kerjasama penggunaan                            MSW has registered and obtained a land right
           tanah, MSW telah mendaftarkan dan                                 over the Certificate of Management Rights
           mendapatkan sertifikat Hak Guna Bangunan                          held by the Government of Tabalong Regency.
           diatas sertifikat Hak Pengelolaan atas nama
           Pemerintah Kabupaten Tabalong.

           Pada tanggal 27 Februari 2014, MSW dan                            On 27 February 2014, MSW and the
           Pemerintah Kabupaten Tabalong melakukan                           Government of Tabalong Regency amended
           perubahan atas jangka waktu perjanjian                            the term of the land-use cooperation
           kerjasama penggunaan tanah menjadi 50                             agreement to 50 years, revised the land area
           tahun, merevisi luas tanah berdasarkan                            based on needs, and provided fixed
           kebutuhan, dan memberikan kontribusi tetap                        contribution and profit sharing to the
           dan pembagian hasil keuntungan kepada                             Government of Tabalong Regency.
           Pemerintah Kabupaten Tabalong.

      c.   Fasilitas bank                                              c.    Banking facilities

           Pada tanggal 5 September 2007, AI                                 On 5 September 2007, AI entered into a
           mengadakan perjanjian fasilitas perbankan                         banking facility agreement with HSBC to issue
           dengan HSBC untuk penerbitan garansi bank.                        bank guarantees. This agreement has been
           Perjanjian ini telah mengalami beberapa kali                      amended several times with the latest
           perubahan dengan perubahan terakhir pada                          amendment dated 19 December 2016. The
           tanggal 19 Desember 2016. Fasilitas ini                           facility represents a combined limit facility
           merupakan gabungan limit fasilitas sebesar                        amounting to US$45,000 with a treasury
           AS$45.000 dengan fasilitas treasury sebesar                       facility amounting to US$5,000. This facility is
           AS$5.000. Fasilitas ini tidak diikat dengan                       not bound by any collateral. This agreement is
           jaminan apapun. Perjanjian ini berlaku sampai                     valid until HSBC cancels, ceases or
           HSBC membatalkan, menghentikan atau                               discharges AI in writing from its obligation
           membebaskan AI secara tertulis dari                               under the agreement, or any other related
           kewajibannya berdasarkan perjanjian, atau                         agreement.
           perjanjian terkait lainnya.
Page 144
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                            Lampiran 5/132 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                           NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                 FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                             30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                          (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                   unless otherwise stated)

39.   PERJANJIAN     PENTING,          IKATAN,      DAN     39.   SIGNIFICANT AGREEMENTS, COMMITMENTS
      KONTINJENSI (lanjutan)                                      AND CONTINGENCIES (continued)

      c.   Fasilitas bank (lanjutan)                              c.    Banking facilities (continued)

           Pada tanggal 28 April 2014, AI mengadakan                    On 28 April 2014, AI entered into a banking
           perjanjian     fasilitas  perbankan    dengan                facility agreement with Bank Mandiri. The
           Bank Mandiri. Fasilitas ini disediakan untuk                 facility is provided to issue a treasury line with
           penerbitan treasury line dengan limit sebesar                a total limit amounting to US$75,000 and
           AS$75.000 dan fasilitas garansi bank dengan                  bank guarantees with a total limit amounting
           limit sebesar AS$50.000 dalam bentuk                         to US$50,000 in the form of bid and
           jaminan penawaran dan pelaksanaan.                           performance bonds. This facility can also be
           Fasilitas ini dapat digunakan oleh perusahaan                used by certain affiliated companies with
           afiliasi tertentu dengan syarat dan ketentuan                certain terms and conditions. This facility is
           tertentu. Fasilitas ini tidak diikat dengan                  not bound by any collateral. The agreement
           jaminan apapun. Perjanjian ini telah                         has been amended several times with the
           mengalami beberapa kali perubahan dengan                     latest amendment dated 26 June 2023 to
           perubahan terakhir pada tanggal 26 Juni 2023                 extend the treasury line facility until 27 April
           untuk memperpanjang fasilitas treasury line                  2024. The bank guarantees facility was valid
           sampai dengan 27 April 2024. Fasilitas garansi               until 27 April 2023.
           bank berlaku sampai dengan 27 April 2023.

           Pada tanggal 30 September 2023, total                        As at 30 September 2023, the total bank
           fasilitas perbankan yang sudah digunakan                     facilities used by AI which were obtained from
           oleh AI yang diperoleh dari HSBC dan Bank                    HSBC and Bank Mandiri amounted to
           Mandiri sebesar AS$29.849 (31 Desember                       US$29,849         (31     December       2022:
           2022:     AS$28.435).   Fasilitas tersebut                   US$28,435). These facilities were utilised in
           digunakan sehubungan dengan kontrak                          relation to sales contracts and reclamation
           penjualan dan jaminan reklamasi.                             guarantees.

           Pada     tanggal     19   Mei    2016,  AP                   On 19 May 2016, AP signed a banking facility
           menandatangani surat fasilitas perbankan                     letter with DBS Bank Ltd, to issue a bank
           dengan DBS Bank Ltd, untuk menerbitkan                       guarantee in the form of financial or
           bank garansi dalam bentuk jaminan finansial                  performance guarantees with a total limit of
           atau pelaksanaan dengan total limit sebesar                  US$25,000. This facility is fully guaranteed by
           AS$25.000. Fasilitas ini dijamin sepenuhnya                  the Company. As at 30 September 2023, the
           oleh Perusahaan. Pada tanggal 30 September                   total bank facility used by AP which was
           2023, total fasilitas perbankan yang sudah                   obtained from DBS Bank Ltd amounted to
           digunakan oleh AP yang diperoleh dari DBS                    US$nil (31 December 2022: US$2,855).
           Bank     Ltd   adalah     sebesar   AS$nihil                 These facilities were utilised in relation to
           (31 Desember 2022: AS$2.855). Fasilitas ini                  performance bonds and contingent sponsor
           digunakan sehubungan dengan jaminan                          support guarantees.
           pelaksanaan dan garansi sponsor pendukung
           kontinjensi.
Page 145
                                     PT ADARO ENERGY INDONESIA Tbk
                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                             Lampiran 5/133 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                   FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                               30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                            (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                     unless otherwise stated)

39.   PERJANJIAN     PENTING,          IKATAN,        DAN     39.   SIGNIFICANT AGREEMENTS, COMMITMENTS
      KONTINJENSI (lanjutan)                                        AND CONTINGENCIES (continued)

      c.   Fasilitas bank (lanjutan)                                c.    Banking facilities (continued)

           Pada tanggal 14 Juli 2017, Perusahaan                          On 14 July 2017, the Company entered into a
           mengadakan perjanjian fasilitas perbankan                      banking facility agreement with BRI to issue
           dengan BRI untuk penerbitan garansi bank                       bank guarantees with a total limit amounting
           dengan total limit sebesar AS$183.500 dalam                    to US$183,500 in the form of bid bonds,
           bentuk     jaminan     penawaran,      jaminan                 performance bonds, reclamation guarantees,
           pelaksanaan, jaminan reklamasi, jaminan izin                   forestry lease-use permit guarantees,
           pinjam pakai kehutanan, Standby Letter of                      Standby Letters of Credit (“SBLC”), advance
           Credit (“SBLC”), jaminan uang muka dan                         payment bonds and maintenance bonds.
           jaminan pemeliharaan. Fasilitas ini dapat                      This facility can also be used by its
           digunakan oleh entitas anak. Fasilitas ini tidak               subsidiaries. This facility is not bound by any
           diikat dengan jaminan apapun. Pada tanggal                     collateral. On 14 October 2021, this
           14 Oktober 2021, perjanjian ini telah                          agreement was amended to extend the
           diamandemen untuk memperpanjang jangka                         maturity date of the agreement and change
           waktu perjanjian dan mengubah total limit                      the total limit of this facility to US$121,500. In
           fasilitas menjadi sebesar AS$121.500. Dalam                    this agreement, the facilities also provided a
           perjanjian ini, fasilitas yang disediakan                      foreign exchange line facility with a total limit
           termasuk fasilitas foreign exchange line                       amounting to US$75,000 and an import line
           dengan total limit sebesar AS$75.000 dan                       facility with a total limit amounting to
           import line dengan total limit sebesar                         US$5,800. This agreement has been
           AS$5.800. Perjanjian ini terakhir diubah pada                  amended, with the most recent amendment
           tanggal 25 Juli 2023 untuk memperpanjang                       dated 25 July 2023 to extend the maturity
           jatuh tempo sampai dengan 14 Juli 2024.                        date to 14 July 2024.

           Pada tanggal 30 September 2023 dan                             As at 30 September 2023 and 31 December
           31 Desember 2022, total fasilitas perbankan                    2022, the total bank facility from BRI used by
           yang diperoleh dari BRI yang sudah                             the Group amounted to US$48,702 and
           digunakan oleh Grup adalah masing-masing                       US$66,249, respectively. The facility was
           sebesar AS$48.702 dan AS$66.249. Fasilitas                     used in relation to reclamation guarantees,
           yang digunakan sehubungan dengan jaminan                       performance bonds, bid bonds, SBLC and
           reklamasi, jaminan pelaksanaan, jaminan                        counter guarantees.
           penawaran, SBLC dan counter guarantees.

           Pada tanggal 9 Mei 2023, Perusahaan                            On 9 May 2023, the Company entered into a
           mengadakan perjanjian fasilitas perbankan                      banking facility agreement with Bank Mandiri
           dengan Bank Mandiri untuk penerbitan                           to issue bank guarantees with a total limit
           garansi bank dengan total limit sebesar                        amounting to US$150,000 in the form of bid
           AS$150.000         dalam    bentuk    jaminan                  bonds, performance bonds, reclamation
           penawaran, jaminan pelaksanaan, jaminan                        guarantees, SBLC and advance payment
           reklamasi, Standby Letter of Credit (“SBLC”),                  bonds with a maturity date of 27 April 2024.
           dan jaminan uang muka untuk jangka waktu                       This facility can also be used by its
           sampai dengan 27 April 2024. Fasilitas ini                     subsidiaries. This facility is not bound by any
           dapat digunakan oleh entitas anak. Fasilitas                   collateral. As at 30 September 2023, the
           ini tidak diikat dengan jaminan apapun. Pada                   Group has not used this facility.
           tanggal 30 September 2023, Grup belum
           menggunakan fasilitas ini.

           Pada tanggal 30 September 2023, AIS                           As at 30 September 2023, AIS has
           memiliki uncommitted trade facilities dengan                  uncommitted trade facilities for a total of
           total sebesar AS$645.000 dari berbagai bank                   US$645,000     from       various    banks
           (31 Desember 2022: AS$485.000). Pada                          (31 December 2022: US$485,000). As at
           tanggal 30 September 2023 dan 31 Desember                     30 September 2023 and 31 December 2022,
           2022, sisa saldo fasilitas perbankan yang                     the remaining balance of the bank facility
           tersedia adalah masing-masing sebesar                         amounted to US$402,646 and US$nil,
           AS$402.646 dan AS$nihil.                                      respectively.
Page 146
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                             Lampiran 5/134 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                 NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                       FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                   30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                                (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                         unless otherwise stated)

39.   PERJANJIAN     PENTING,          IKATAN,       DAN      39.   SIGNIFICANT AGREEMENTS, COMMITMENTS
      KONTINJENSI (lanjutan)                                        AND CONTINGENCIES (continued)

      c.   Fasilitas bank (lanjutan)                                c.       Banking facilities (continued)

           Penggunaan      fasilitas   bank tertentu                         The use of certain banking facilities requires
           mensyaratkan Grup untuk menempatkan                               the Group to maintain time deposits (Note 5).
           deposito berjangka (Catatan 5).

      d.   Komitmen penjualan                                       d.       Sales commitments

           Pada tanggal 30 September 2023 dan                                As at 30 September 2023 and 31 December
           31 Desember 2022, AI dan MC memiliki                              2022, AI and MC had various commitments to
           beberapa komitmen untuk mengirimkan                               deliver    coal    to   various    customers
           batubara kepada beberapa pelanggan dengan                         approximately totalling 77 million metric
           total nilai berkisar masing-masing sebesar                        tonnes and 75 million metric tonnes
           77 juta metrik ton dan 75 juta metrik ton (tidak                  (unaudited), respectively, subject to price
           diaudit), bergantung kepada kesepakatan                           agreements. The coal will be delivered
           harga. Batubara tersebut akan dikirimkan                          periodically from 2023 until the expiry of the
           secara periodik dari tahun 2023 sampai                            IUPK       for    the     Continuation       of
           berakhirnya IUPK sebagai Kelanjutan Operasi                       Contract/Agreement Operation of AI or the
           Kontrak/Perjanjian AI atau pada akhir PKP2B                       CCoW of MC.
           MC.

      e.   Komitmen belanja modal                                   e.       Capital expenditure commitments

           Pada tanggal 30 September 2023 dan                                As at 30 September 2023 and 31 December
           31 Desember 2022, Grup mempunyai                                  2022, the Group had purchase orders for
           pesanan pembelian untuk kapal, peralatan                          vessels, mining equipment, hauling roads and
           tambang, konstruksi jalan tambang dan                             infrastructure construction amounting to
           infrastruktur  masing-masing    sebesar                           US$682,139 and US$367,047, respectively.
           AS$682.139 dan AS$367.047.

      f.   Pungutan penggunaan kawasan hutan                        f.       Levy for use of forestry areas

           Berdasarkan Peraturan Pemerintah No. 33                           Based on Government Regulation No. 33 Year
           Tahun 2014 tentang Jenis dan Tarif Atas Jenis                     2014 on the Type and Tariff of PNBP from the
           PNBP yang berasal dari Penggunaan                                 Use of Forestry Area for the Interest of
           Kawasan       Hutan     untuk    Kepentingan                      Development other than Forestry Activities
           Pembangunan Diluar Kegiatan Kehutanan                             Applicable to the Forestry Ministry, it is
           yang Berlaku pada Kementerian Kehutanan,                          stipulated that the use of forestry areas for the
           diatur bahwa penggunaan kawasan hutan                             interest of development other than forestry
           untuk kepentingan pembangunan diluar                              activities is subject to a PNBP levy for the
           kegiatan kehutanan dikenakan pungutan                             entire forest area that is leased and used and
           PNBP atas seluruh area kawasan hutan yang                         for the entire forest area for which lease and
           dipinjam-pakaikan dan seluruh area perjanjian                     use agreements are still effective, in
           pinjam pakai kawasan hutan yang masih                             accordance with the utilisation criteria, with a
           berlaku sesuai kriteria penggunaannya                             tariff ranging from Rp1,600,000/hectare to
           dengan tarif berkisar dari Rp1.600.000/hektar                     Rp4,000,000/hectare.        This    Government
           sampai       dengan       Rp4.000.000/hektar.                     Regulation was effective from August 2014
           Peraturan Pemerintah ini mulai berlaku                            and the Group has recognised this PNBP levy
           Agustus 2014 dan Grup telah mengakui                              on an accrual basis.
           pungutan PNBP ini secara akrual.
Page 147
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                            Lampiran 5/135 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                 30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                              (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                       unless otherwise stated)

39.   PERJANJIAN     PENTING,         IKATAN,       DAN     39.   SIGNIFICANT AGREEMENTS, COMMITMENTS
      KONTINJENSI (lanjutan)                                      AND CONTINGENCIES (continued)

      g.   Perjanjian Fasilitas Bahan Bakar                       g.        Fuel Facilities Agreement

           Pada tanggal 11 September 2015, IBT                              On 11 September 2015, IBT entered into a
           mengadakan Perjanjian Fasilitas Bahan Bakar                      Fuel Facilities Agreement with Pertamina,
           dengan Pertamina, dimana Pertamina setuju                        whereby Pertamina agreed to operate the
           untuk mengoperasikan fasilitas di dalam                          facilities within the terminal excluding the
           terminal kecuali fasilitas bersama untuk                         shared facilities for the purpose of supplying
           kepentingan penyediaan bahan bakar AI dan                        fuel to AI and third parties. For the use of the
           pihak ketiga. Untuk penggunaan fasilitas ini,                    facilities, Pertamina agreed to pay a lease fee
           Pertamina setuju untuk membayar biaya sewa                       per barrel of fuel loaded and a port handling
           berdasarkan bahan bakar yang keluar per                          fee based on the fuel discharged and loaded.
           barel dan jasa pengelolaan pelabuhan
           berdasarkan bahan bakar yang masuk dan
           keluar.

           Pada tanggal 21 Juni 2016, dalam rangka                          On 21 June 2016, in order to increase the
           meningkatkan tingkat pemasokan bahan bakar                       fuel volume supplied to third parties, IBT
           ke pihak ketiga, IBT setuju untuk memberikan                     agreed to give a rebate on lease fees per
           rabat atas biaya sewa per barelnya untuk                         barrel for fuel volumes above the guaranteed
           volume bahan bakar melebihi perjanjian                           annual volume supplied to third parties.
           tahunan yang akan dipasok ke pihak ketiga.                       Since 1 September 2021, according to
           Sejak tanggal 1 September 2021, berdasarkan                      novation agreement of Fuel Facilities
           perjanjian novasi atas Perjanjian Fasilitas                      Agreement that has been made and signed
           Bahan Bakar yang telah dibuat dan                                by and between IBT, Pertamina, and PT
           ditandatangani oleh dan antara IBT,                              Pertamina Patra Niaga, all of the
           Pertamina, dan PT Pertamina Patra Niaga,                         responsibilities, rights and obligations of
           seluruh tanggung jawab, hak dan kewajiban                        Pertamina under the Fuel Supply Agreement
           Pertamina berdasarkan Perjanjian Fasilitas                       were transferred to PT Pertamina Patra
           Bahan Bakar dialihkan kepada PT Pertamina                        Niaga. The agreement expired on 1 October
           Patra Niaga. Perjanjian ini berakhir pada                        2022 and has been extended until 31
           tanggal 1 Oktober 2022 dan telah diperpanjang                    January 2023.
           sampai dengan 31 Januari 2023.

           Pada tanggal 31 Januari 2023, IBT                                On 31 January 2023, IBT entered into a New
           mengadakan Perjanjian Fasilitas Bahan Bakar                      Fuel Facility Agreement with PT Pertamina
           yang baru dengan PT Pertamina Patra Niaga,                       Patra Niaga, whereby PT Pertamina Patra
           di mana PT Pertamina Patra Niaga setuju                          Niaga agreed to lease the fuel facilities and
           untuk menyewa fasilitas bahan bakar dan IBT                      IBT will carry out the operation and
           melaksanakan operasional dan pemeliharaan                        maintenance of the fuel facilities in the
           fasilitas bahan bakar di dalam terminal, untuk                   terminal, for the purpose of supplying fuel to
           kepentingan penyediaan bahan bakar AI dan                        AI and third parties. For the use of the
           pihak ketiga. Untuk penggunaan fasilitas ini,                    facilities, PT Pertamina Patra Niaga agreed
           PT Pertamina Patra Niaga setuju untuk                            to pay a lease fee, operation and
           membayar biaya sewa, biaya operasi dan                           maintenance fee per barrel of fuel loaded and
           pemeliharaan berdasarkan bahan bakar yang                        a port handling fee per kilolitre based on the
           keluar per barel, dan biaya pengelolaan                          fuel discharged and loaded. The agreement
           pelabuhan berdasarkan bahan bakar yang                           has a period until 30 September 2029.
           masuk dan keluar per kiloliter. Perjanjian ini
           mempunyai jangka waktu sampai dengan
           tanggal 30 September 2029.

      h.   Undang-Undang Pertambangan No. 3/2020                  h.        Mining Law No. 3/2020

           Pada tanggal 10 Juni 2020, telah diundangkan                    On 10 June 2020, Law No. 3 of 2020 on
           Undang-Undang No. 3 Tahun 2020 tentang                          Amendment to Law No. 4 of 2009 on Mineral
           Perubahan atas Undang-Undang No. 4 Tahun                        and Coal Mining (“Law No. 3/2020”) was
           2009 tentang Pertambangan Mineral dan                           promulgated.
           Batubara (“UU No. 3/2020”).
Page 148
                                   PT ADARO ENERGY INDONESIA Tbk
                              DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                           Lampiran 5/136 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                             (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                      unless otherwise stated)

39.   PERJANJIAN      PENTING,       IKATAN,       DAN     39.   SIGNIFICANT AGREEMENTS, COMMITMENTS
      KONTINJENSI (lanjutan)                                     AND CONTINGENCIES (continued)

      h.   Undang-Undang Pertambangan No. 3/2020                 h.       Mining Law No. 3/2020 (continued)
           (lanjutan)

           UU No. 3/2020 mengatur beberapa hal,                            Law No. 3/2020 governs several provisions,
           diantaranya adalah pemegang PKP2B yang                          including that the holder of a CCA/CCoW that
           bermaksud untuk memperoleh IUPK sebagai                         intends to obtain IUPK for the Continuation of
           Kelanjutan Operasi Kontrak/Perjanjian harus                     Contract/Agreement Operation shall submit
           mengajukan permohonan dalam jangka waktu                        the application within 5 (five) years at the
           paling cepat 5 (lima) tahun dan paling lambat                   earliest and 1 (one) year at the latest before
           1 (satu) tahun sebelum PKP2B berakhir serta                     the CCA/CCoW expires, and can be
           dapat diperpanjang setelah memenuhi syarat                      extended after fulfilling the requirements as
           dengan ketentuan yang diatur dalam UU                           stipulated in Law No. 3/2020. Law No. 3/2020
           No. 3/2020. UU No. 3/2020 turut mengatur                        also regulates that the implementing
           bahwa peraturan pelaksanaan atas UU                             regulations of Law No. 3/2020 shall be
           No. 3/2020 harus ditetapkan dalam waktu                         established within 1 (one) year after Law No.
           1 (satu) tahun sejak UU No. 3/2020 mulai                        3/2020 comes into force. On 2 November
           berlaku. Pada tanggal 2 November 2020,                          2020, Law No. 11/2020 on Job Creation
           Undang-Undang No. 11/2020 tentang Cipta                         (“Law No. 11/2020”) was promulgated, which
           Kerja (“UU No. 11/2020”) telah diundangkan                      amended several provisions of Law No.
           yang mengubah beberapa ketentuan pada UU                        3/2020. On 30 December 2022, the
           No. 3/2020. Pada tanggal 30 Desember 2022,                      Government issued Government Regulation
           Pemerintah        mengeluarkan      Peraturan                   in lieu of Law No. 2 of 2022 regarding Job
           Pemerintah Pengganti Undang-Undang No. 2                        Creation (“Perppu No. 2/2022”), which
           Tahun 2022 tentang Cipta Kerja (Perppu No.                      revoked Law No. 11/2020 and also amended
           2/2022) yang mencabut UU No. 11/2020 dan                        several provisions of Law No. 3/2020. On 31
           juga mengubah beberapa ketentuan UU No.                         March 2023, the Government enacted Law
           3/2020. Pada tanggal 31 Maret 2023,                             No. 6 of 2023 regarding the stipulation of
           Pemerintah telah memberlakukan Undang-                          Perppu No. 2/2022 into Law (“Law No.
           Undang No. 6 tahun 2023 tentang penetapan                       6/2023”). With the enactment of Law No.
           Perppu No. 2/2022 menjadi Undang-Undang                         6/2023, it was confirmed that Law No.
           (“UU No. 6/2023”). Dengan diberlakukannya                       11/2020 has been revoked and is no longer
           UU No. 6/2023, maka terkonfirmasi bahwa UU                      valid.
           No. 11/2020 telah dicabut dan dinyatakan
           tidak berlaku.

           Pada bulan Februari 2010, Pemerintah                            In February 2010, the Government released
           mengeluarkan dua Peraturan Pemerintah atas                      two implementing regulations for Mining Law
           UU Pertambangan No. 4/2009, yaitu                               No. 4/2009, i.e. Government Regulation
           Peraturan Pemerintah No. 22/2010 dan                            No. 22/2010 and 23/2010 (“GR No. 22” and
           23/2010 (“PP No. 22” dan “PP No. 23”). PP No.                   “GR No. 23”). GR No. 22 deals with the
           22 mengatur tentang pembentukan area                            establishment of the mining areas under the
           pertambangan dengan menggunakan IUP                             new IUP. GR No. 23 provides clarifications
           baru. PP No. 23 memperjelas prosedur untuk                      regarding the procedures to obtain a new IUP
           memperoleh sistem IUP baru. PP No. 23                           system. GR No. 23 indicates that existing
           menyatakan bahwa PKP2B yang ada akan                            CCA/CCoWs will be honoured by the
           tetap diakui oleh Pemerintah, namun demikian                    Government, although any extension of an
           perpanjangan atas PKP2B tersebut akan                           existing CCA/CCoWs will take place through
           dilakukan melalui penerbitan IUP.                               the issue of an IUP.

           Pemerintah Indonesia mengubah PP No. 23                         The Government further amended GR No. 23
           dengan menerbitkan Peraturan Pemerintah                         by issuing, among others, Government
           No. 24/2012 pada tanggal 21 Februari 2012                       Regulation No. 24/2012 on 21 February 2012
           dan selanjutnya mengeluarkan Peraturan                          and later by issuing Government Regulation
           Pemerintah No. 1/2014 tertanggal 11 Januari                     No. 1/2014 dated 11 January 2014,
           2014, Peraturan Pemerintah No. 77/2014                          Government Regulation No. 77/2014 dated
           tertanggal 14 Oktober 2014, Peraturan                           14 October 2014, Government Regulation
           Pemerintah No. 1/2017 tertanggal 11 Januari                     No. 1/2017 dated 11 January 2017 and
           2017 dan Peraturan Pemerintah No. 8/2018                        Government Regulation No. 8/2018 dated
           tertanggal 7 Maret 2018. Pada tanggal                           7 March 2018. On 9 September 2021, the
           9 September 2021, Pemerintah mengeluarkan                       Government issued Government Regulation
           Peraturan Pemerintah No. 96 Tahun 2021                          No.     96    of    2021   concerning    the
           tentang Pelaksanaan Kegiatan Usaha                              Implementation of Mineral and Coal Business
           Pertambangan Mineral dan Batubara yang                          Activities which revokes GR No. 23 including
           mencabut PP No. 23 termasuk perubahannya.                       its amendments.
Page 149
                                   PT ADARO ENERGY INDONESIA Tbk
                              DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                           Lampiran 5/137 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                             (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                      unless otherwise stated)

39.   PERJANJIAN      PENTING,       IKATAN,       DAN     39.   SIGNIFICANT AGREEMENTS, COMMITMENTS
      KONTINJENSI (lanjutan)                                     AND CONTINGENCIES (continued)

      h.   Undang-Undang Pertambangan No. 3/2020                 h.        Mining Law No. 3/2020 (continued)
           (lanjutan)

           Grup     terus    memonitor     perkembangan                   The Group is closely monitoring the progress
           peraturan      pelaksana       Undang-Undang                   of the implementing regulations for the Law
           tersebut     secara      ketat    dan   akan                   and will consider the impact on the Group’s
           mempertimbangkan dampak terhadap operasi                       operations, if any, as these regulations are
           Grup, jika ada, pada saat peraturan-peraturan                  issued.
           pelaksana ini diterbitkan.

      i.   Peraturan Menteri Lingkungan Hidup dan                 i.       Ministerial Regulation of Environment and
           Kehutanan No. P.59/MENLHK/SETJEN/                               Forestry     No.   P.59/MENLHK/SETJEN/
           KUM.1/10/2019                                                   KUM.1/10/2019

           Pada bulan November 2019, Kementerian                           In November 2019, the Ministry of
           Lingkungan Hidup dan Kehutanan (“KLHK”)                         Environment and Forestry (“MoE&F”)
           mengeluarkan         Peraturan     Menteri                      issued        Ministerial        Regulation
           No. P.59/MENLHK/SETJEN/KUM.1/10/2019                            No. P.59/MENLHK/SETJEN/KUM.1/10/2019
           tentang     Penanaman       dalam  Rangka                       regarding the Planting for the Rehabilitation
           Rehabilitasi Daerah Aliran Sungai.                              of Watershed Areas.

           Peraturan ini merupakan pedoman bagi                            This regulation is a guideline for Borrow and
           pemegang Izin Pinjam Pakai Kawasan Hutan                        Use of Forest Area Permit (Izin Pinjam Pakai
           (“IPPKH”) yang memiliki kewajiban untuk                         Kawasan Hutan/”IPPKH”) holders, who are
           melakukan penanaman rehabilitasi Daerah                         obligated to perform rehabilitation of
           Aliran Sungai (“DAS”) pada lokasi yang                          watershed at a location stipulated in
           ditetapkan berdasarkan ketentuan yang diatur                    accordance with the provisions set forth in
           dalam peraturan ini, dan dengan tata cara                       this regulation, and with the procedure of
           pelaksanaan penanaman sesuai ketentuan                          rehabilitation according to the provisions set
           yang diatur dalam peraturan ini.                                forth in this regulation.

           AI, MC dan LC, sebagai pemegang IPPKH                           AI, MC and LC, as the holders of an IPPKH
           sudah mulai melaksanakan kewajiban atas                         have started to fulfil the obligation by planting
           penanaman rehabilitasi DAS tersebut dan                         the rehabilitation of the watershed and have
           telah mengakui kewajiban ini secara akrual,                     recognised this obligation on an accrual
           sehingga manajemen berpendapat bahwa                            basis. Therefore, management believes that
           Grup telah memenuhi ketentuan dalam                             the Group has complied with the provisions in
           peraturan sebagaimana dimaksud diatas.                          the regulation as mentioned above.

      j.   Peraturan Menteri No. 48/2017                         j.        Ministerial Regulation No. 48/2017

           Pada tanggal 3 Agustus 2017, KESDM                              On 3 August 2017, the MoEMR issued
           mengeluarkan Peraturan Menteri No. 48/2017                      Ministerial Regulation No. 48/2017 regarding
           tentang Pengawasan Pengusahaan di Sektor                        the Control of Enterprises in the Energy and
           Energi dan Sumber Daya Mineral (“Permen                         Mineral Resources Sector (“Ministerial
           No. 48/2017”). Peraturan ini di antaranya                       Regulation No. 48/2017”). This regulation
           mengatur mengenai persyaratan pengalihan                        governs the transfer of shares and changes
           saham dan perubahan Direksi dan/atau                            in the Directors and/or Commissioners. Any
           Komisaris. Setiap pengalihan saham di AI,                       transfer of shares of AI, the AMC entities, PC,
           entitas-entitas AMC, PC, RC, PCS, SCM, LSA,                     RC, PCS, SCM, LSA, MIP and BEE is subject
           MIP dan BEE tergantung pada persetujuan                         to the prior approval of the MoEMR.
           terlebih dahulu dari KESDM.
Page 150
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                             Lampiran 5/138 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                  30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                               (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                        unless otherwise stated)

39.   PERJANJIAN     PENTING,         IKATAN,       DAN      39.   SIGNIFICANT AGREEMENTS, COMMITMENTS
      KONTINJENSI (lanjutan)                                       AND CONTINGENCIES (continued)

      k.   Peraturan Menteri No. 7/2020                            k.        Ministerial Regulation No. 7/2020

           Pada tanggal 3 Maret 2020, KESDM                                  On 3 March 2020, the MoEMR issued
           mengeluarkan Peraturan Menteri No. 7/2020                         Ministerial Regulation No. 7/2020 regarding
           tentang Tata Cara Pemberian Wilayah,                              Procedures for the Granting of Areas,
           Perizinan dan Pelaporan Pada Kegiatan                             Licensing and Reporting on Mineral and Coal
           Usaha Pertambangan Mineral dan Batubara                           Mining Activities (“Permen No. 7/2020”).
           (“Permen No. 7/2020”). Permen No. 7/2020 ini                      Permen No. 7/2020 revokes, among others,
           antara lain mencabut Peraturan Menteri No.                        Ministerial Regulation No. 11/2018 on the
           11/2018 tentang Tata Cara Pemberian                               Procedures for the Granting of Areas,
           Wilayah, Perizinan, dan Pelaporan pada                            Licensing and Reporting on Mineral and Coal
           Kegiatan Usaha Pertambangan Mineral dan                           Mining Activities (“Permen No. 11/2018”),
           Batubara (“Permen No. 11/2018”), Peraturan                        Ministerial Regulation No. 22/2018 on the
           Menteri No. 22/2018 tentang Perubahan atas                        Amendment to Permen No. 11/2018,
           Permen No. 11/2018, Peraturan Menteri No.                         Ministerial Regulation No. 51/2018 on the
           51/2018 tentang Perubahan Kedua atas                              Second Amendment to Permen No. 11/2018
           Permen No. 11/2018 dan ketentuan mengenai                         and provisions regarding changes in the
           perubahan Direksi dan/atau Komisaris di                           Directors and/or Commissioners in the
           bidang pertambangan mineral dan batubara                          mineral and coal mining sector as stipulated
           sebagaimana      diatur   dalam     Permen                        in Ministerial Regulation No. 48/2017.
           No. 48/2017.

           Permen No. 7/2020 ini di antaranya mengatur                       Permen No. 7/2020 regulates the preparation
           tentang penyiapan dan penetapan Wilayah                           and determination of Mining Permit Areas
           Izin Usaha Pertambangan (“WIUP”) dan                              (“WIUP”) and Special Mining Permit Areas
           Wilayah Izin Usaha Pertambangan Khusus                            (“WIUPK”), Information System of Mining
           (“WIUPK”),      Sistem     Informasi   Wilayah                    Areas, procedures for granting WIUP and
           Pertambangan, tata cara pemberian WIUP                            WIUPK, licensing procedures, rights,
           dan WIUPK, tata cara pemberian perizinan,                         obligations and prohibitions and budget work
           hak, kewajiban, dan larangan dan rencana                          plans and reports. Based on the terms and
           kerja    anggaran      biaya    dan    laporan.                   conditions or procedures in Permen No.
           Berdasarkan persyaratan dan ketentuan atau                        7/2020, any changes in shares of AI, the
           tata cara dalam Permen No. 7/2020 tersebut,                       AMC entities, PC, RC, PCS, SCM, LSA, MIP
           setiap perubahan saham di AI, entitas-entitas                     and BEE are subject to prior approval from
           AMC, PC, RC, PCS, SCM, LSA, MIP dan BEE                           the MoEMR or the governor according to their
           wajib     terlebih    dahulu      mendapatkan                     authority and any changes in Directors and/or
           persetujuan KESDM atau gubernur sesuai                            Commissioners of AI, the AMC entities, PC,
           dengan       kewenangannya        dan    setiap                   RC, PCS, SCM, LSA, MIP and BEE must be
           perubahan Direksi dan/atau Komisaris di AI,                       submitted to the MoEMR or governor
           entitas-entitas AMC, PC, RC, PCS, SCM,                            according to their authority. However, based
           LSA, MIP dan BEE wajib disampaikan kepada                         on Law No. 3/2020, all authorities of local
           KESDM          atau       gubernur       sesuai                   government in coal and mineral mining have
           kewenangannya.           Namun        demikian,                   been transferred to the central government.
           berdasarkan UU No. 3/2020, seluruh                                Permen No. 7/2020 has been amended
           kewenangan pemerintah daerah di bidang                            through Ministerial Regulation No. 16/2021
           pertambangan mineral dan batubara dialihkan                       regarding the Amendment to Permen
           kepada pemerintah pusat. Permen No. 7/2020                        No. 7/2020 issued on 29 June 2021.
           ini telah diubah dengan Peraturan Menteri
           No. 16/2021 tentang Perubahan atas Permen
           No. 7/2020 yang diterbitkan pada tanggal
           29 Juni 2021.

           Pada tanggal 19 April 2018, KESDM                                 On 19 April 2018, the MoEMR issued
           menerbitkan        Keputusan         Menteri                      Ministerial Decree No. 1796K/30/MEM/2018
           No. 1796K/30/MEM/2018 mengenai Pedoman                            regarding the Guidelines for the Application,
           Pelaksanaan Permohonan, Evaluasi, serta                           Evaluation, and Issuance of Licences in the
           Penerbitan Perizinan di bidang Pertambangan                       Mineral and Coal Mining Sector, which
           Mineral dan Batubara, yang di antara lain                         among others regulates the guidelines for the
           mengatur        pedoman         pelaksanaan                       implementation of application, evaluation and
           permohonan, evaluasi, dan penerbitan IUPK                         the issuance of an IUPK Operation
           Operasi Produksi perpanjangan dari Kontrak                        Production as an extension of an expired
           Karya atau PKP2B yang telah berakhir.                             Contract of Work or CCA/CCoW.
Page 151
                                   PT ADARO ENERGY INDONESIA Tbk
                              DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                          Lampiran 5/139 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                  FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                              30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                           (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                    unless otherwise stated)

39.   PERJANJIAN     PENTING,       IKATAN,      DAN     39.   SIGNIFICANT AGREEMENTS, COMMITMENTS
      KONTINJENSI (lanjutan)                                   AND CONTINGENCIES (continued)

      l.   Peraturan Menteri No. 7/2017                        l.    Ministerial Regulation No. 7/2017

           Pada tanggal 11 Januari 2017, KESDM                       On 11 January 2017, the MoEMR issued
           mengeluarkan Peraturan Menteri No. 7/2017,                Ministerial Regulation No. 7/2017, which was
           yang telah terakhir kali diubah melalui                   most recently amended through Ministerial
           Peraturan Menteri No. 11/2020 yang                        Regulation No. 11/2020, regulating the
           mengatur tentang Tata Cara Penetapan                      Procedures for the Setting of Benchmark
           Harga Patokan Penjualan Mineral Logam                     Prices for Metal Minerals and Coal Sales.
           dan Batubara.      Berdasarkan Peraturan                  Under Ministerial Regulation No. 7/2017, the
           Menteri No. 7/2017, beberapa ketentuan di                 provisions of Ministerial Regulation No.
           Peraturan Menteri No. 17/2010 berhubungan                 17/2010 relating to benchmark prices for
           dengan harga patokan penjualan untuk                      minerals and coal sales are revoked from that
           mineral dan batubara dicabut sejak tanggal                date.
           tersebut.

           Pada     tanggal    27    Februari 2023,                  On 27 February 2023, the MoEMR
           KESDM menerbitkan Keputusan Menteri No.                   issued        Ministerial      Decree       No.
           41.K/MB.01/MEM.B/2023 tentang Pedoman                     41.K/MB.01/MEM.B/2023          regarding    the
           Penetapan Harga Patokan Untuk Penjualan                   Guidelines for the Determination of Benchmark
           Komoditas Batubara. Keputusan Menteri ini                 Prices for the Sale of Coal Commodity. This
           mengatur formula-formula baru untuk                       Ministerial Decree stipulates new formulas for
           perhitungan Harga Batubara Acuan dan                      the calculation of the Coal Reference Price and
           Harga Patokan Batubara yang berlaku sejak                 the Coal Benchmark Price which are effective
           tanggal 27 Februari 2023.                                 from 27 February 2023.

           Pada tanggal 11 Agustus 2023, KESDM                       On 11 August 2023, the MoEMR issued
           menerbitkan     Keputusan     Menteri   No.               Ministerial             Decree             No.
           227.K/MB.01/MEM.B/2023              tentang               227.K/MB.01/MEM.B/2023         regarding   the
           Pedoman Penetapan Harga Patokan Untuk                     Guidelines for the Determination of Benchmark
           Penjualan Komoditas Batubara, yang sejak                  Prices for the Sale of Coal Commodity, which
           tanggal tersebut mencabut Keputusan                       revoked        Ministerial    Decree       No.
           Menteri     No.    41.K/MB.01/MEM.B/2023.                 41.K/MB.01/MEM.B/2023 from that date.
           Keputusan             Menteri           No.               Ministerial             Decree             No.
           227.K/MB.01/MEM.B/2023 mengatur terkait:                  227.K/MB.01/MEM.B/2023 stipulates: (i) new
           (i) formula-formula baru untuk perhitungan                formulas for the calculation of the Coal
           Harga Batubara Acuan dan Harga Patokan                    Reference Price and the Coal Benchmark
           Batubara, serta (ii) penetapan spesifikasi                Price, and (ii) the determination of the
           acuan dan perhitungan Harga Jual Batubara                 reference specification and calculation of the
           untuk Penyediaan Tenaga Listrik untuk                     Selling Price of Coal for the Supply of
           kepentingan     umum     dan   Pemenuhan                  Electricity for the public interest and to
           Kebutuhan Bahan Baku/Bahan Bakar                          Fulfillment of the Raw Materials/Fuels Needs
           Industri di dalam negeri selain Industri                  for Domestic Industry other than the Metal
           Pengolahan dan/atau Pemurnian Mineral                     Mineral Processing and/or Refining Industry,
           Logam, yang berlaku sejak tanggal                         which are effective from 11 August 2023.
           11 Agustus 2023.
Page 152
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                             Lampiran 5/140 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                  FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                              30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                           (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                    unless otherwise stated)

39.   PERJANJIAN     PENTING,          IKATAN,      DAN      39.   SIGNIFICANT AGREEMENTS, COMMITMENTS
      KONTINJENSI (lanjutan)                                       AND CONTINGENCIES (continued)

      m.   Keputusan Menteri         No.    267.K/MB.01/           m.   Ministerial Decree No. 267.K/MB.01/MEM.B/
           MEM.B/2022                                                   2022

           Pada tanggal 21 November 2022, KESDM                         On 21 November 2022, MoEMR issued
           mengeluarkan Keputusan Menteri No. 267.K/                    Ministerial Decree No. 267.K/MB.01/MEM.B/
           MB.01/MEM.B/2022       terkait  Pemenuhan                    2022 regarding Fulfilment of Domestic Coal
           Kebutuhan     Batubara      Dalam      Negeri                Needs (“Ministerial Decree No. 267.K/MB.01/
           (“Keputusan           Menteri             No.                MEM.B/2022”), which revoked Ministerial
           267.K/MB.01/MEM.B/ 2022”), yang mencabut                     Decree      No.      139.K/HK.02/MEM.B/2021
           Keputusan             Menteri             No.                regarding Fulfilment of Domestic Coal Needs
           139.K/HK.02/MEM.B/2021               tentang                 and         Ministerial      Decree       No.
           Pemenuhan Kebutuhan Batubara Dalam                           13.K/HK.021/MEM.B/ 2022 regarding the
           Negeri    dan   Keputusan      Menteri    No.                Guidelines for Imposing Administrative
           13.K/HK.021/MEM.B/2022 tentang Pedoman                       Sanctions, Prohibition of Overseas Coal Sale,
           Pengenaan Sanksi Administratif, Pelarangan                   and Imposing Fines and Compensation Funds
           Penjualan Batubara ke Luar Negeri, dan                       to Fulfil Domestic Coal Needs. The Ministerial
           Pengenaan Denda serta Dana Kompensasi                        Decree      No.      267.K/MB.01/MEM.B/2022
           Pemenuhan Kebutuhan Batubara Dalam                           determined the percentage of coal sales for
           Negeri.     Keputusan        Menteri      No.                domestic needs of 25% (twenty five percent) of
           267.K/MB.01/MEM.B/      2022    menetapkan                   the planned annual coal production volume as
           persentase    penjualan    batubara     untuk                stated in the initial approval of Annual Work
           kebutuhan dalam negeri sebesar 25% (dua                      Plan and Budget (Rencana Kerja dan
           puluh lima persen) dari rencana jumlah                       Anggaran Biaya Tahunan or “RKAB”), or the
           produksi batubara tahunan sebagaimana                        amendment to the RKAB, approved by the
           tercantum dalam persetujuan awal Rencana                     Government, whichever is higher.
           Kerja dan Anggaran Biaya Tahunan (“RKAB”),
           atau perubahannya yang disetujui oleh
           Pemerintah, yang mana yang lebih tinggi.

           Keputusan Menteri No. 267.K/MB.01/MEM.B/2022                 Ministerial Decree No. 267.K/MB.01/MEM.B/2022
           juga mengatur antara lain terkait (i) kewajiban              also stipulates (i) obligation to pay fines and/or
           pembayaran denda dan dana kompensasi                         compensation funds for non-fulfilment of
           atas tidak terpenuhinya kewajiban pemenuhan                  domestic market obligation (DMO), (ii)
           kebutuhan dalam negeri (DMO), (ii) sanksi                    administrative sanctions including export ban,
           administratif termasuk larangan ekspor                       (iii) coal sales price of US$70 per metric tonne
           batubara, (iii) harga jual batubara sebesar                  FOB vessel for supplying coal for electricity
           AS$70 per metrik ton kapal FOB untuk                         provided in the public interest, and (iv)
           pasokan listrik untuk kepentingan publik, serta              assignment to meet domestic coal needs in an
           (iv) penugasan untuk pemenuhan kebutuhan                     emergency condition.
           batubara dalam negeri pada keadaan darurat.

           Berdasarkan Surat Direktorat Jenderal Mineral                Based on the Directorate General of Mineral
           dan Batubara No. B-1645/MB.05/DBB.OP/2022                    and Coal Letter No. B-1645/MB.05/DBB.OP/2022
           tanggal 30 Desember 2022, AI, LSA, SCM,                      dated 30 December 2022, AI, MIP, SCM, and
           dan MIP wajib memenuhi pasokan batubara                      LSA are required to fulfil the coal supply for the
           untuk pembangkit listrik Grup PLN dan IPP                    power plants of PLN Group and IPPs in 2023.
           tahun 2023. Dalam hal ini, volume pasokan                    In this case, the assigned coal supply volume
           batubara yang ditugaskan dihitung sebagai                    is calculated as part of the fulfilment of the
           bagian dari pemenuhan persyaratan DMO. AI,                   DMO requirement. AI, MIP, SCM, and LSA will
           MIP, SCM dan LSA akan memonitor                              monitor the fulfilment of the requirements of
           pemenuhan pasokan batubara ke PLTU tahun                     the assignment letter in 2023 and are
           2023 dan berkoordinasi dengan pihak terkait                  coordinating with the related parties to fulfil the
           guna     memenuhi      pelaksanaan      surat                implementation of these assignments.
           penugasan ini.

           Grup     akan     senantiasa    berupaya                     The Group will continue to strive to meet its
           memenuhi     kewajibannya    sebagaimana                     obligations as stipulated in the Ministerial
           diatur dalam Keputusan Menteri No.                           Decree No. 267/K/MB.01/MEM.B/2022.
           267.K/MB.01/MEM.B/2022.
Page 153
                                      PT ADARO ENERGY INDONESIA Tbk
                                 DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                               Lampiran 5/141 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                    NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                          FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                      30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                                   (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                            unless otherwise stated)

39.   PERJANJIAN      PENTING,           IKATAN,        DAN      39.   SIGNIFICANT AGREEMENTS, COMMITMENTS
      KONTINJENSI (lanjutan)                                           AND CONTINGENCIES (continued)

      n.   Keputusan         Menteri                  No.              n.       Ministerial       Decree                 No.
           58.K/HK.02/MEM.B/2022                                                58.K/HK.02/MEM.B/2022

           Pada tanggal 23 Maret 2022, KESDM                                    On 23 March 2022, the MoEMR issued
           mengeluarkan       Keputusan    Menteri  No.                         Ministerial Decree No. 58.K/HK.02/MEM.B/2022
           58.K/HK.02/MEM.B/2022 tentang Harga Jual                             regarding the Selling Price of Coal for the
           Batubara Untuk Pemenuhan Kebutuhan                                   Fulfilment of the Raw Materials/Fuels for the
           Bahan Baku/Bahan Bakar Industri di Dalam                             Domestic Industry Needs (“Ministerial Decree
           Negeri      (“Keputusan       Menteri    No.                         No.        58.K/HK.02/MEM.B/2022”).         This
           58.K/HK.02/MEM.B/2022”).           Keputusan                         Ministerial Decree, among other things,
           Menteri ini antara lain mengatur harga jual                          regulates the selling price of coal to meet the
           batubara untuk pemenuhan bahan baku/bahan                            domestic needs for raw material/ industrial fuel
           bakar industri di dalam negeri sebesar AS$90                         at US$90 per metric tonne FOB vessel (for
           per metrik ton kapal FOB (untuk batubara                             coal with specifications as stipulated in the
           dengan spesifikasi sebagaimana diatur dalam                          Ministerial Decree). The selling price of coal to
           Keputusan Menteri). Penetapan harga jual                             meet the needs of domestic industrial raw
           batubara untuk pemenuhan bahan baku/bahan                            materials/fuels does not apply to the metal
           bakar industri di dalam negeri tidak berlaku                         mineral processing and/or refining industry.
           atas industri pengolahan dan/atau pemurnian
           mineral logam.

           Keputusan Menteri ini mulai berlaku pada                             This Ministerial Decree came into effect on
           tanggal 1 April 2022 dan mencabut Keputusan                          1 April 2022 and revoked Ministerial Decree
           Menteri     No.     206.K/HK.02/MEM.B/2021                           No. 206.K/HK.02/MEM.B/2021 concerning the
           tentang    Harga     Jual  Batubara   untuk                          Selling Price of Coal for Fulfilment of the Raw
           Pemenuhan Kebutuhan Bahan Baku/Bahan                                 Material/Fuel for the Cement and Fertiliser
           Bakar Industri Semen dan Pupuk di Dalam                              Domestic Industry.
           Negeri.

           Dengan diberlakukannya Keputusan Menteri                             Following the enactment of this Ministerial
           ini, maka harga penjualan batubara Grup ke                           Decree, the selling price of coal for the Group
           pasar industri domestik (selain ke industri                          to the domestic industrial market (other than for
           pemurnian/pengolahan mineral logam) akan                             the processing and/or refining of the metallic
           mengalami penurunan bila dibandingkan                                minerals industry) will decrease compared to
           dengan     proyeksi   sebelumnya.    Namun                           the      previous     projection.      However,
           demikian, manajemen berpendapat bahwa                                management believes that the implementation
           implementasi Keputusan Menteri ini tidak                             of this Ministerial Decree will not have a
           berdampak signifikan terhadap penjualan dan                          significant impact on the Group's sales and
           kinerja keuangan Grup.                                               financial performance.

      o.   Peraturan Pemerintah No. 15/2022                            o.      Government Regulation No. 15/2022

           Pada tanggal 11 April 2022, Pemerintah                               On 11 April 2022, the Government issued
           menerbitkan Peraturan Pemerintah No.                                 Government Regulation No. 15/2022, on the
           15/2022 tentang perlakuan perpajakan                                 Treatment of Taxation and/or PNBP in the coal
           dan/atau   PNBP       di  bidang  usaha                              mining sector, which regulates among others,
           pertambangan batubara, yang diantaranya                              the following:
           mengatur sebagai berikut:

           -   Tarif PNBP berupa penjualan hasil tambang                        -   The PNBP rate for sales of mining
               per ton dihitung berdasarkan formula yang                            products per tonne is calculated based on
               diatur dalam peraturan ini dengan tarif                              the formula stipulated in this regulation at
               sebesar 14% sampai dengan 28%                                        a rate of 14% to 28% (multiplied by the
               (dikalikan harga jual), tergantung dengan                            selling price), depending on the applicable
               Harga Batubara Acuan (“HBA”) yang                                    Coal Reference Price (“HBA”), minus the
               berlaku, dikurangi tarif iuran produksi/royalti                      tariff for contribution of production/royalty
               batubara dan dikurangi tarif pemanfaatan                             for Coal and minus the tariff for utilisation
               BMN eks PKP2B dari hasil produksi per ton                            of BMN ex-PKP2B from production yield
               (0,21% dikalikan harga jual).                                        per tonne (0.21% multiplied by the selling
                                                                                    price).
Page 154
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                             Lampiran 5/142 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                  30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                               (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                        unless otherwise stated)

39.   PERJANJIAN      PENTING,         IKATAN,       DAN     39.   SIGNIFICANT AGREEMENTS, COMMITMENTS
      KONTINJENSI (lanjutan)                                       AND CONTINGENCIES (continued)
      o.   Peraturan Pemerintah No. 15/2022 (lanjutan)             o.      Government          Regulation      No.    15/2022
                                                                           (continued)
           Pada tanggal 11 April 2022, Pemerintah                           On 11 April 2022, the Government issued
           menerbitkan Peraturan Pemerintah No.                             Government Regulation No. 15/2022, on the
           15/2022 tentang perlakuan perpajakan                             Treatment of Taxation and/or PNBP in the coal
           dan/atau   PNBP       di     bidang  usaha                       mining sector, which regulates among others,
           pertambangan batubara, yang diantaranya                          the following: (continued)
           mengatur sebagai berikut: (lanjutan)
           -   PNBP bagian Pemerintah Pusat sebesar                          -     PNBP for the Central Government's share
               4% dan bagian Pemerintah Daerah sebesar                             of 4% and Local Government’s portion of
               6% dari keuntungan bersih pemegang IUPK                             6% of the net profit of IUPK holders for the
               sebagai         Kelanjutan         Operasi                          Continuation      of    Contract/Agreement
               Kontrak/Perjanjian,     sesuai      dengan                          Operations, in accordance with the
               ketentuan peraturan perundang-undangan                              provisions of laws and regulations in the
               di bidang pertambangan mineral dan                                  field of mineral and coal mining at the time
               batubara pada saat IUPK sebagai                                     the IUPK for the Continuation of
               Kelanjutan Operasi Kontrak/Perjanjian                               Contract/Agreement Operations is issued.
               diterbitkan.
           -   PNBP di bidang lingkungan hidup dan                           -     PNBP in the environmental and forestry
               kehutanan sesuai dengan ketentuan                                   sector in accordance with the provisions of
               peraturan perundang-undangan di bidang                              the laws and regulations in the applicable
               PNBP yang berlaku.                                                  PNBP sector.
           -   Tarif PPh Badan sebesar 22%.                                  -     CIT rate of 22%.
           -   Pajak bumi dan bangunan sesuai dengan                         -     Land and building tax in accordance with
               ketentuan peraturan perundang-undangan                              the prevailing laws and regulations in the
               di bidang pajak bumi dan bangunan yang                              field of land and building tax.
               berlaku.
           -   Berdasarkan IUPK sebagai Kelanjutan                           -     Based on the IUPK for the Continuation of
               Operasi Kontrak/Perjanjian AI (Catatan 1c),                         Contract Operations/Agreement of AI
               AI wajib membayar pendapatan negara dan                             (Note 1c), AI is required to pay state
               pendapatan daerah sesuai dengan jenis,                              revenue and regional revenue according
               tarif,   serta  tata   cara     pengenaan,                          to the type, tariff, and procedures for
               pemungutan, dan pembayaran/penyetoran                               imposition,          collection,       and
               pada tahun berikutnya setelah tahun IUPK                            payment/deposit in the following year after
               sebagai         Kelanjutan         Operasi                          the year of IUPK for the Continuation of
               Kontrak/Perjanjian    diterbitkan    sesuai                         Contract/Agreement Operation issued in
               dengan ketentuan peraturan perundang-                               accordance with statutory provisions, in
               undangan, dalam hal ini untuk AI adalah                             this case for AI, from 1 January 2023.
               sejak 1 Januari 2023.
           AI telah mengimplementasikan ketentuan                                AI has implemented the provisions of this
           dalam peraturan ini sejak 1 Januari 2023.                             regulation since 1 January 2023.
      p.   Peraturan Pemerintah No. 26/2022                        p.        Government Regulation No. 26/2022
           Pada tanggal 15 Agustus 2022, Pemerintah                          On 15 August 2022, the Government issued
           menerbitkan Peraturan Pemerintah No.                              Government Regulation No. 26/2022,
           26/2022 tentang Jenis dan Tarif atas Jenis                        concerning Types and Tariffs for Types of
           PNBP yang berlaku pada KESDM, antara lain                         PNBP that apply to the MoEMR, which among
           mengatur penerimaan pemanfaatan sumber                            others regulates receipts from the use of
           daya alam mineral dan batubara, seperti: (i)                      natural mineral and coal resources, such as:
           Iuran tetap untuk IUP dan IUPK Operasi                            (i) fixed contribution rate of IUP and IUPK
           Produksi Mineral Logam dan Batubara                               Mineral     and      Production    Operations
           sebesar Rp60.000/hektar/tahun; dan IUP dan                        amounting to Rp60,000/hectare/year; and
           IUPK Eksplorasi Mineral Logam dan Batubara                        IUP and IUPK Mineral and Coal Exploration
           sebesar Rp30.000/hektar/tahun, (ii) Iuran                         amounting to Rp30,000/hectare/year; (ii)
           produksi/royalti untuk batubara (Open pit)                        contribution of production/royalty for Coal
           berdasarkan tingkat kalori dan level HBA                          (Open pit) ranging based on calorie and HBA
           antara 5,0% sampai 13,5% dari harga per                           level at a percentage ranging from 5.0% to
           metrik ton; (iii) Iuran produksi/royalti untuk                    13.5% of the price per metric-tonne; (iii)
           batubara (underground) berdasarkan tingkat                        Contribution of production/royalty for coal
           kalori dan level HBA antara 4,0% sampai                           (underground) ranging based on calorie and
           12,5% dari harga per metrik ton.                                  HBA level at a percentage ranging from 4.0%
                                                                             to 12.5% of the price per metric-tonne.
Page 155
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                            Lampiran 5/143 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                            30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                         (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                  unless otherwise stated)

39.   PERJANJIAN     PENTING,         IKATAN,       DAN     39.   SIGNIFICANT AGREEMENTS, COMMITMENTS
      KONTINJENSI (lanjutan)                                      AND CONTINGENCIES (continued)

      q.   Undang-Undang No. 6 Tahun 2023 (“UU No.                q.   Law No. 6 of 2023 (“Law No. 6/2023”)
           6/2023”)

           Pada tanggal 31 Maret 2023, telah diundangkan               On 31 March 2023, Law No. 6 of 2023 which
           UU No. 6/2023 yang menetapkan Perppu No.                    stipulated Perppu No. 2/2022 became law.
           2/2022 menjadi Undang-Undang. Perppu No.                    Perppu No. 2/2022 was enacted on 30
           2/2022 telah ditetapkan pada tanggal 30                     December 2022 as a follow up to the
           Desember 2022 sebagai tindak lanjut Putusan                 Constitutional Court Decision No. 91/PUU-
           Mahkamah Konstitusi No. 91/PUU-XVIII/2020                   XVIII/2020 which mandates improvements to
           yang mengamanatkan perbaikan atas UU No.                    Law 11/2020, where amendments and
           11/2020, di mana perubahan dan penggantian                  replacements were made among others,
           yang dilakukan, diantaranya, mengenai                       regarding improvements to the investment
           peningkatan ekosistem investasi dan kegiatan                ecosystem       and     business      activities,
           berusaha,     ketenagakerjaan,     kemudahan                employment, ease of doing business,
           berusaha, dukungan riset dan inovasi,                       encouragement to research and innovation,
           pengadaan tanah, dan kawasan ekonomi.                       land acquisition, and economic zones. With the
           Dengan      berlakunya  UU      No.    6/2023,              enactment of Law No. 6/2023, Law No.
           terkonfirmasi bahwa UU No. 11/2020 dicabut                  11/2020 is revoked and no longer valid.
           dan dinyatakan tidak berlaku. Manajemen                     Management believes that the implementation
           berpendapat bahwa implementasi UU No.                       of Law No. 6/2023 has no significant impact on
           6/2023 tidak memiliki dampak signifikan pada                the Group’s financial performance.
           kinerja keuangan Grup.

      r.   Peraturan Pemerintah No. 50 tahun 2022                 r.   Government Regulation No. 50 of 2022

           Pada tanggal 12 Desember 2022, Pemerintah                   On 12 December 2022, the Government
           telah menerbitkan Peraturan Pemerintah No. 50               issued Government Regulation No. 50 of 2022
           tahun 2022 (“PP No. 50/2022”) tentang Tata                  (“GR No. 50/2022”) concerning Procedures for
           Cara Pelaksanaan Hak dan Pemenuhan                          the Implementation of Rights and Fulfilment of
           Kewajiban Perpajakan.                                       Tax Obligations.

           PP No. 50/2022 mengatur tentang pembaruan                   GR No. 50/2022 stipulates renewal of
           pelaksanaan hak dan pemenuhan kewajiban                     implementation of rights and fulfilment of tax
           perpajakan yang bertujuan untuk memberikan                  obligations, which aims to provide more legal
           kepastian hukum, keadilan, kemudahan dan                    certainty, justice, ease and clarity to the public
           kejelasan     kepada     masyarakat    dalam                in understanding the implementation of tax
           memahami ketentuan mengenai pelaksanaan                     rights and the fulfilment of obligations, such as
           hak dan pemenuhan kewajiban perpajakan,                     provisions for Tax Identity Number registration
           meliputi ketentuan pendaftaran. Nomor Pokok                 and integration of population data with taxation
           Wajib Pajak dan integrasi data kependudukan                 data, implementation of tax rights and the
           dengan data perpajakan, pelaksanaan hak dan                 fulfilment of obligations electronically, as well as
           pemenuhan kewajiban perpajakan secara                       provisions regarding the implementation of
           elektronik,    serta   ketentuan    mengenai                rights and the fulfilment of obligations in carbon
           pelaksanaan        hak    dan    pemenuhan                  tax.    Management         believes     that    the
           kewajiban     pajak    karbon.    Manajemen                 implementation of this regulation will not have a
           berpendapat bahwa implementasi peraturan ini                significant impact on the Group’s financial
           tidak akan berdampak signifikan terhadap                    performance.
           kinerja keuangan Grup.

      s.   Peraturan Pemerintah No. 55 tahun 2022                 s.   Government Regulation No. 55 of 2022

           Pada tanggal 20 Desember 2022, Pemerintah                   On 20 December 2022, the Government
           telah menerbitkan Peraturan Pemerintah No. 55               issued Government Regulation No. 55 of 2022
           tahun 2022 (“PP No. 55/2022”) tentang                       (“GR No.      55/2022”) concerning the
           Penyesuaian     Pengaturan     dibidang Pajak               Adjustments to the Regulations in the field of
           Penghasilan.                                                Income Taxes.
Page 156
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                            Lampiran 5/144 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                           NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                 FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                             30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                          (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                   unless otherwise stated)

39.   PERJANJIAN     PENTING,          IKATAN,       DAN     39.   SIGNIFICANT AGREEMENTS, COMMITMENTS
      KONTINJENSI (lanjutan)                                       AND CONTINGENCIES (continued)

      s.   Peraturan Pemerintah No. 55 tahun 2022                  s.    Government Regulation No. 55 of 2022
           (lanjutan)                                                    (continued)

           PP No. 55/2022 mengatur antara lain                           GR No. 55/2022 regulates, among other
           administrasi perpajakan bagi Wajib Pajak                      things, tax administration for taxpayers with a
           dengan peredaran bruto tertentu dalam jangka                  certain gross income within a certain period of
           waktu tertentu, pengecualian dari objek Pajak                 time, exemptions from income tax ("PPh")
           Penghasilan (“PPh”), biaya yang dapat                         objects, costs that can be deducted from gross
           dikurangkan dari penghasilan bruto dan                        income and reduced PPh rates for public
           penurunan tarif PPh bagi Perusahaan Terbuka                   companies that meet certain requirements.
           yang     memenuhi     persyaratan     tertentu.               Management believes that the implementation
           Manajemen berpendapat bahwa implementasi                      of this regulation has no significant impact on
           peraturan ini tidak berdampak signifikan                      the Group's financial performance.
           terhadap kinerja keuangan Grup.

      t.   Peraturan Menteri Lingkungan Hidup dan                  t.   Regulation of the Minister of Environment
           Kehutanan No. 21/2022                                        and Forestry No. 21/2022

           Pada    tanggal    21   September    2022,                   On 21 September 2022, the Ministry of
           Kementerian     Lingkungan    Hidup   dan                    Environment and Forestry issued Ministerial
           Kehutanan telah menerbitkan Peraturan                        Regulation No. 21/2022 ("Permen LHK
           Menteri No. 21/2022 ("Permen LHK 21/2022")                   21/2022") concerning the Implementation of
           tentang Tata Laksana Penerapan Nilai                         Carbon Economic Values ("NEK").
           Ekonomi Karbon (“NEK”).

           Peraturan ini diantaranya mengatur mengenai                  This regulation regulates, among others,
           penyelenggaraan NEK melalui berbagai                         implementation of the NEK through various
           mekanisme,       salah     satunya   melalui                 mechanisms, one of which is through carbon
           perdagangan karbon, baik dalam negeri                        trading, both domestically and abroad;
           maupun luar negeri; pengukuran, pelaporan                    measurement, reporting and verification of
           dan verifikasi penyelenggaraan NEK; dan                      NEK implementation; and a certificate of
           sertifikat pengurangan emisi gas rumah kaca.                 reducing greenhouse gas emissions. This
           Peraturan ini juga mengatur ketentuan yang                   regulation also stipulates conditions that must
           harus dipenuhi oleh para pelaku usaha untuk                  be met by business actors to be able to carry
           dapat melakukan perdagangan karbon.                          out carbon trading.

           Grup memonitor perkembangan peraturan                        The Group is closely monitoring the progress
           pelaksana Undang-Undang tersebut secara                      of the implementing regulations for the Law
           ketat dan akan mempertimbangkan dampak                       and will consider the impact on the Group’s
           terhadap operasi Grup, jika ada.                             operations, if any.

      u.   PPTL Jangka Panjang untuk Proyek                        u.   Long-term PPA for the Central Java Coal-
           Pembangkit Listrik Bertenaga Uap Swasta                      Fired Steam Power Plant Independent
           di Jawa Tengah                                               Power Producer (“IPP”) Project in Central
                                                                        Java

           Perusahaan, bersama-sama dengan Electric                     The Company, together with Electric Power
           Power Development Co Ltd (“Jpower”) dan                      Development Co Ltd (“Jpower”) and Itochu
           Itochu Corporation (“Itochu”), membentuk                     Corporation (“Itochu”), formed a consortium –
           Konsorsium “Jpower-Adaro-Itochu” untuk                       the “Jpower-Adaro-Itochu” Consortium – to
           melaksanakan        pengembangan      proyek                 undertake the development of coal-fired
           pembangkit listrik bertenaga uap berkapasitas                steam power plant 2x1,000 MW project in
           2x1.000 MW di Kabupaten Batang, Provinsi                     Batang Regency, the Province of Central
           Jawa Tengah. Pada bulan Juli 2011,                           Java. In July 2011, the Consortium
           Konsorsium mendirikan BPI, dimana Grup,                      established BPI, in which the Group, through
           melalui entitas anak perusahaannya, AP,                      its subsidiary, AP, Jpower and Itochu own
           Jpower dan Itochu mempunyai partisipasi                      participating interests of 34%, 34% and 32%,
           kepemilikan masing-masing sebesar 34%,                       respectively, to build, own, operate and
           34%, dan 32%, untuk membangun, memiliki,                     transfer a coal-fired steam power plant.
           mengoperasikan dan mengalihkan pembangkit
           listrik bertenaga uap.
Page 157
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                            Lampiran 5/145 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                  FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                              30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                           (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                    unless otherwise stated)

39.   PERJANJIAN     PENTING,          IKATAN,      DAN      39.   SIGNIFICANT AGREEMENTS, COMMITMENTS
      KONTINJENSI (lanjutan)                                       AND CONTINGENCIES (continued)

      u.   PPTL Jangka Panjang untuk Proyek                        u.    Long-term PPA for the Central Java Coal-
           Pembangkit Listrik Bertenaga Uap Swasta                       Fired Steam Power Plant Independent
           di Jawa Tengah (lanjutan)                                     Power Producer (“IPP”) Project in Central
                                                                         Java (continued)

           Pada tanggal 6 Oktober 2011, BPI dan                          On 6 October 2011, BPI and PLN signed a
           PLN menandatangani PPTL jangka panjang.                       long-term PPA. The PPA includes the
           PPTL ini mencakup pembangunan pembangkit                      construction of a coal-fired steam power plant
           listrik bertenaga uap berkapasitas 2x1.000 MW                 with a total capacity of 2x1,000 MW in Batang
           di kabupaten Batang, Provinsi Jawa Tengah                     Regency, the Province of Central Java
           (CJPP) dan penyediaan listrik ke PLN selama                   (CJPP) and a 25-year supply of electricity to
           25 tahun. Proyek CJPP akan ditransfer ke PLN                  PLN. Upon expiration of the PPA term, the
           pada saat PPTL berakhir. Selain itu, Perjanjian               CJPP project will be transferred to PLN. In
           Penjaminan juga telah ditandatangani oleh dan                 addition to the PPA, a Guarantee Agreement
           antara Pemerintah yang diwakili oleh Menteri                  was also signed by and between the
           Keuangan            Republik         Indonesia,               Government represented by the Minister of
           PT Penjaminan        Infrastruktur    Indonesia               Finance of the Republic of Indonesia, PT
           (Persero) (“PII”), dan BPI, pada tanggal 6                    Penjaminan Infrastruktur Indonesia (Persero)
           Oktober 2011 dan dalam hal ini, Pemerintah                    (“PII”) and BPI, on 6 October 2011, and in this
           dan PII memberikan jaminan pembayaran PLN                     case, the Government and PII guaranteed
           kepada BPI yang diatur dalam PPTL. Tanggal                    PLN’s payment obligations for BPI under the
           efektif Perjanjian Penjaminan dimulai pada                    PPA. The effective date of the Guarantee
           tanggal pembiayaan yaitu pada tanggal 6 Juni                  Agreement starts from the financing date
           2016 dan akan berlaku sampai dengan 21                        which is 6 June 2016 and shall be effective
           tahun setelah Tanggal Operasi Komersial                       until 21 years after the CJPP Project
           Proyek CJPP.                                                  Commercial Operation Date.

           Pada   tanggal    6    April  2016,     BPI                   On 6 April 2016, BPI signed Amendment No.
           menandatangani Amandemen No. 7 terhadap                       7 to the PPA which extends the required
           PPTL    yang     memperpanjang      tanggal                   financing date under the PPA to 6 June 2016.
           pembiayaan yang dipersyaratkan berdasarkan
           PPTL menjadi 6 Juni 2016.

           Pada tanggal 13 April 2016, BPI dan PLN                       On 13 April 2016, BPI and PLN signed
           kembali menandatangani Amandemen No. 8                        Amendment No. 8 to the PPA, which
           atas PPTL yang mengatur mengenai                              regulates PLN’s obligation to acquire the
           kewajiban PLN untuk mengakuisisi Tanah                        State Reserved Land for the development of
           Cadangan Umum Negara untuk pembangunan                        the CJPP project and BPI and PLN
           proyek CJPP dan kewajiban BPI dan PLN                         obligations to enter into a Land Lease
           untuk menandatangani Perjanjian Sewa Tanah                    Agreement with respect to the 125,146 m2
           sehubungan dengan plot-plot tanah sebesar                     plots of land acquired by PLN pursuant to Law
           125.146 m2 yang diakuisisi oleh PLN                           No. 2 of 2012 and Land Utilisation Agreement
           berdasarkan UU No. 2 Tahun 2012 dan                           with respect to the State Reserved Land.
           Perjanjian Penggunaan Tanah sehubungan
           dengan Tanah Cadangan Umum Negara.

           Pada tanggal 14 April 2016, BPI dan PLN                       On 14 April 2016, BPI and PLN signed the
           menandatangani Perjanjian Sewa Tanah                          Land Lease Agreement with respect to Law
           sehubungan dengan UU No. 2 Tahun 2012                         No. 2 of 2012 and the Land Utilisation
           dan     Perjanjian    Penggunaan       Tanah                  Agreement with respect to the State
           sehubungan dengan Tanah Cadangan Umum                         Reserved Land. Through the signing of the
           Negara. Dengan ditandatanganinya Perjanjian                   Land Lease Agreement and the Land
           Sewa Tanah dan Perjanjian Penggunaan                          Utilisation Agreement, all required land for the
           Tanah tersebut, seluruh tanah yang diperlukan                 development of the CJPP project has been
           untuk pembangunan proyek CJPP telah                           acquired.
           diperoleh.
Page 158
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                            Lampiran 5/146 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                 30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                              (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                       unless otherwise stated)

39.   PERJANJIAN     PENTING,         IKATAN,       DAN     39.    SIGNIFICANT AGREEMENTS, COMMITMENTS
      KONTINJENSI (lanjutan)                                       AND CONTINGENCIES (continued)

      u.   PPTL Jangka Panjang untuk Proyek                        u.       Long-term PPA for the Central Java Coal-
           Pembangkit Listrik Bertenaga Uap Swasta                          Fired Steam Power Plant Independent
           di Jawa Tengah (lanjutan)                                        Power Producer (“IPP”) Project in Central
                                                                            Java (continued)

           Pada tanggal 11 Mei 2016, BPI dan PLN                            On 11 May 2016, BPI and PLN signed
           menandatangani Amandemen No. 9 atas                              Amendment No. 9 to the PPA with respect to
           PPTL sehubungan dengan penerapan                                 the implementation of Bank Indonesia
           Peraturan Bank Indonesia No. 17/3/PBI/2015                       Regulation No. 17/3/PBI/2015 regarding the
           tentang Kewajiban Penggunaan Rupiah di                           Mandatory Use of Rupiah within the Territory
           Wilayah Negara Kesatuan Republik Indonesia.                      of the Republic of Indonesia.

           Pada tanggal 6 Juni 2016, BPI telah mencapai                     On 6 June 2016, BPI achieved the financing
           tanggal      pembiayaan         sebagaimana                      date as required by the PPA.
           dipersyaratkan oleh PPTL.

           Pada tanggal 30 Agustus 2021, BPI dan PLN                        On 30 August 2021, BPI and PLN signed the
           menandatangani       Amandemen          dan                      Amendment and Restatement Agreement
           Pernyataan Kembali Perjanjian sehubungan                         relating to the PPA, which among others
           dengan PPTL, yang antara lain menunda                            defers the required Commercial Operation
           Tanggal Operasi Komersial dan Tanggal                            Dates and Required Project Commercial
           Operasi Komersial Proyek yang Disyaratkan                        Operation Date to 2022. The CJPP first unit
           menjadi di tahun 2022. Unit pertama CJPP                         was commissioned and began commercial
           telah menyelesaikan komisioning dan mulai                        operations on 15 August 2022, while the
           beroperasi secara komersial sejak 15 Agustus                     CJPP second unit was commissioned and
           2022, sedangkan unit kedua CJPP telah                            began commercial operations on 31 August
           menyelesaikan komisioning dan mulai                              2022.
           beroperasi secara komersial sejak 31 Agustus
           2022.

      v.   PPTL untuk Proyek IPP Pembangkit Listrik               v.       PPA for the South Kalimantan Coal-Fired
           Bertenaga Uap di Kalimantan Selatan                             Steam Power Plant IPP Project

           Perusahaan, bersama-sama dengan Korea                           The Company, together with Korea East-West
           East-West Power Co, Ltd, membentuk                              Power Co, Ltd, formed a consortium with
           konsorsium dengan partisipasi kepemilikan                       participation interests of 65% and 35%,
           masing-masing sebesar 65% dan 35%. Pada                         respectively. On 12 August 2013, the
           tanggal 12 Agustus 2013, konsorsium                             consortium established TPI to build, own,
           mendirikan TPI untuk membangun, memiliki,                       operate and transfer a coal-fired steam power
           mengoperasikan,         dan       mengalihkan                   plant.
           pembangkit listrik bertenaga uap.

           Pada tanggal 15 Oktober 2014, TPI dan PLN                       On 15 October 2014, TPI and PLN signed a
           menandatangani PPTL jangka panjang. PPTL                        long-term PPA. The PPA contemplates,
           ini mencakup antara lain, keahlian teknik,                      among others, the engineering, construction,
           pembangunan, kepemilikan dan operasi                            ownership, and operation of a coal-fired steam
           pembangkit listrik bertenaga uap berkapasitas                   power plant with a total capacity of 2x100 MW
           2x100 MW di Provinsi Kalimantan Selatan                         in the Province of South Kalimantan (South
           (South Kalimantan Power Plant/“SKPP”) dan                       Kalimantan Power Plant/“SKPP”) and a 25-
           penyediaan listrik ke PLN selama 25 tahun.                      year supply of electricity to PLN. Upon the
           Proyek SKPP akan ditransfer ke PLN pada                         expiration of the PPA term, the SKPP project
           saat PPTL berakhir. Proyek ini termasuk                         will be transferred to PLN. This project is
           dalam Proyek Fast Track Program tahap 2                         included in the Fast Track Programme Project
           (FTP-2) dengan skema Build, Own, Operate                        phase 2 (FTP-2), with the Build, Own, Operate
           and    Transfer     (“BOOT”).    Proyek    ini                  and Transfer (“BOOT”) scheme. This Project
           memperoleh fasilitas penjaminan Pemerintah                      obtained support from the Government,
           melalui Menteri Keuangan Republik Indonesia                     represented by the Minister of Finance of the
           dalam bentuk Surat Jaminan Kelayakan                            Republic of Indonesia (“MoF”) in the form of a
           Usaha (“SJKU”) yang diterbitkan tanggal 3                       Business Viability Guarantee Letter (“BVGL”)
           Januari 2017. Tanggal efektif SJKU dimulai                      dated 3 January 2017. The BVGL effective
           pada tanggal pembiayaan dan akan berlaku                        date commences on the financing date and
           sampai dengan 17 tahun setelah Tanggal                          shall be effective until 17 years after the COD
           Operasi Komersial sesuai dengan PPA.                            pursuant to the PPA.
Page 159
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                            Lampiran 5/147 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                  FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                              30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                           (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                    unless otherwise stated)

39.   PERJANJIAN PENTING,           IKATAN,      DAN     39.   SIGNIFICANT AGREEMENTS, COMMITMENTS
      KONTINJENSI (lanjutan)                                   AND CONTINGENCIES (continued)

      v.   PPTL untuk Proyek IPP Pembangkit                    v.    PPA for the South Kalimantan Coal-Fired
           Listrik Bertenaga Uap di Kalimantan                       Steam Power Plant IPP Project (continued)
           Selatan (lanjutan)

           Pada tanggal 18 November 2016, TPI dan                    On 18 November 2016, TPI and PLN signed
           PLN menandatangani Amandemen No. 1                        Amendment No. 1 to the PPA concerning the
           atas PPTL yang mengatur perubahan                         invoicing and payment procedures and the form
           tentang   prosedur   penagihan      dan                   of PLN consent letter.
           pembayaran dan format surat persetujuan
           PLN.

           Pada tanggal 24 Januari 2017, TPI                          On 24 January 2017, TPI achieved the
           mencapai        tanggal     pembiayaan                     financing date as required by the PPA. The
           sebagaimana dipersyaratkan oleh PPTL.                      SKPP first unit was commissioned and began
           Unit pertama SKPP telah menyelesaikan                      commercial operations on 23 September 2019,
           komisioning dan mulai beroperasi secara                    while the SKPP second unit was commissioned
           komersial sejak 23 September 2019,                         and began commercial operations on
           sedangkan unit kedua SKPP telah selesai                    14 December 2019.
           komisioning dan mulai beroperasi secara
           komersial sejak 14 Desember 2019.

      w.   Proses hukum                                        w.    Legal proceedings

           Grup (beserta ventura bersamanya) dari                     From time to time, the Group (including its joint
           waktu ke waktu terlibat dalam berbagai                     ventures) is involved in various legal
           tuntutan hukum yang dapat mempengaruhi                     proceedings as a normal consequence of the
           kegiatan bisnis Grup. Grup berkeyakinan                    Group’s business. The Group is of the opinion
           bahwa       keputusan     yang      tidak                  that adverse decisions in any pending or
           menguntungkan sehubungan dengan                            threatened proceedings, or any amounts it may
           tuntutan hukum yang sedang berjalan, atau                  be required to pay by reason thereof, are
           keharusan untuk membayar sejumlah ganti                    unlikely to have a material adverse effect on its
           rugi dari tuntutan hukum tersebut,                         financial condition or the consolidated results of
           kemungkinan      besar     tidak    akan                   operations.
           mempengaruhi kondisi keuangan atau
           hasil   operasi   konsolidasian   secara
           material.

      x.   Perjanjian Pinjaman dengan KIKI                     x.    Loan Agreement with KIKI

           Pada tanggal 30 Agustus 2021, ATBI                        On 30 August 2021, ATBI entered into a Loan
           mengadakan Perjanjian Pinjaman sebesar                    Agreement of Rp150,000,000,000 (full amount)
           Rp150.000.000.000 (nilai penuh) dengan                    with KIKI. This loan facility will be used for land
           KIKI. Fasilitas pinjaman ini digunakan                    acquisition in the business of establishing an
           untuk pembebasan tanah dalam usaha                        industrial area in North Kalimantan (the
           pendirian kawasan industri di Kalimantan                  “Project”) and the development of KIKI’s
           Utara (“Proyek”) dan pengembangan                         business operations. This loan facility bears
           kegiatan usaha KIKI. Fasilitas pinjaman ini               fixed interest at a certain percentage per annum
           dikenakan suku bunga tetap sebesar                        and will be due within 2 years from the first loan
           persentase tertentu per tahun dan akan                    drawdown date of the facility. Prior to or on the
           jatuh tempo dalam jangka waktu 2 tahun                    maturity date, part or all of the unpaid loan can
           sejak tanggal dilakukannya pencairan                      be converted by ATBI into shares, with terms
           pinjaman pertama. Sebelum atau pada                       and conditions to be agreed upon in the future,
           tanggal jatuh tempo, sebagian atau seluruh                unless otherwise determined by the parties.
           pinjaman yang belum dibayar dapat                         Loan conversion will be carried out only on loans
           dikonversi oleh ATBI menjadi saham,                       that have not been repaid by KIKI, while interest
           dengan persyaratan dan ketentuan yang                     on loans must be paid by KIKI. This facility is not
           akan     disepakati   kemudian,     kecuali               bound by any collateral.
           ditentukan lain oleh para pihak. Konversi
           pinjaman hanya akan dilakukan atas
           pinjaman yang belum dibayarkan oleh KIKI,
           sementara untuk bunga pinjaman harus
           dibayarkan oleh KIKI. Fasilitas ini tidak
           diikat dengan jaminan apapun.
Page 160
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                            Lampiran 5/148 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                           NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                 FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                             30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                          (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                   unless otherwise stated)

39.   PERJANJIAN     PENTING,         IKATAN,       DAN     39.   SIGNIFICANT AGREEMENTS, COMMITMENTS
      KONTINJENSI (lanjutan)                                      AND CONTINGENCIES (continued)

      x.   Perjanjian Pinjaman dengan KIKI (lanjutan)             x.   Loan Agreement with KIKI (continued)

           Pada tanggal 30 Agustus 2023, KIKI telah                    On 30 August 2023, KIKI has fully repaid the
           melakukan pelunasan atas fasilitas pinjaman                 loan facility.
           tersebut.

           Pada tanggal 2 Desember 2021, ATBI                          On 2 December 2021, ATBI entered into a
           menandatangani Perjanjian Pinjaman sebesar                  Loan Agreement of Rp948,000,000,000 (full
           Rp948.000.000.000 (nilai penuh) dengan                      amount) with KIKI. On 17 March 2022,
           KIKI. Pada tanggal 17 Maret 2022, dilakukan                 Amendment I was made to the agreement to
           Amandemen I atas perjanjian tersebut untuk                  change the total amount of the loan facility to
           mengubah jumlah fasilitas pinjaman menjadi                  Rp1,026,000,000,000 (full amount). On 28
           sebesar Rp1.026.000.000.000 (nilai penuh).                  July 2022, Amendment II was made to
           Pada tanggal 28 Juli 2022, dilakukan                        change the total amount of the loan facility to
           Amandemen II atas perjanjian tersebut untuk                 Rp1,164,000,000,000 (full amount).
           mengubah jumlah fasilitas pinjaman menjadi
           sebesar Rp1.164.000.000.000 (nilai penuh).

           Fasilitas pinjaman ini dikenakan bunga                      This loan facility bears interest at a certain
           sebesar persentase tertentu dan akan jatuh                  percentage and will be due within two years
           tempo dalam jangka waktu dua tahun sejak                    from the first drawdown date of the facility.
           tanggal dilakukannya pencairan pinjaman                     The loan facility is guaranteed by the share
           pertama. Fasilitas pinjaman ini diikat dengan               pledge of KIKI. The loan will be used for the
           jaminan berupa gadai saham KIKI. Pinjaman                   Project’s development cost, land purchase
           akan digunakan untuk biaya pembangunan                      and/or land compensation and other costs
           Proyek,    pembelian      tanah      dan/atau               related to the Project. The drawdown of the
           kompensasi pembebasan tanah dan biaya-                      loan is subject to the fulfilment of certain
           biaya lain yang terkait dengan Proyek.                      conditions.
           Pencairan pinjaman bergantung pada
           pemenuhan kondisi-kondisi tertentu.

           Selama periode sembilan bulan yang berakhir                 For      the   nine-month     period    ended
           pada tanggal 30 September 2023, ATBI                        30 September 2023, ATBI has additional
           melakukan     tambahan    pencairan    atas                 disbursement of loan to KIKI under this loan
           pinjaman ke KIKI atas fasilitas pinjaman ini                facility was Rp33,000,000,000 (full amount)
           adalah sebesar Rp33.000.000.000 (nilai                      or equivalent to US$2,182 (for the nine-month
           penuh) atau setara dengan AS$2.182 (untuk                   period ended 30 September 2022:
           periode sembilan bulan yang berakhir pada                   Rp177,360,000,000       (full   amount)    or
           tanggal      30      September        2022:                 equivalent to US$11,632).
           Rp177.360.000.000 (nilai penuh) atau setara
           dengan AS$11.632).

           Pada tanggal 30 September 2023, saldo                       As at 30 September 2023, the outstanding
           pinjaman yang terutang atas fasilitas pinjaman              balance     of  this  loan     facility  was
           ini adalah sebesar Rp227.360.000.000 (nilai                 Rp227,360,000,000        (full        amount)
           penuh) atau setara dengan AS$14.644                         or equivalent to US$14,644 (31 December
           (31 Desember 2022: Rp314.360.000.000                        2022: Rp314,360,000,000 (full amount) or
           (nilai penuh) atau setara dengan AS$19.983)                 equivalent to US$19,983) (Note 14).
           (Catatan 14).
Page 161
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                             Lampiran 5/149 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                  FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                              30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                           (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                    unless otherwise stated)

39.   PERJANJIAN     PENTING,          IKATAN,       DAN     39.   SIGNIFICANT AGREEMENTS, COMMITMENTS
      KONTINJENSI (lanjutan)                                       AND CONTINGENCIES (continued)

      y.   Perjanjian Pinjaman dengan KIPI                         y.   Loan Agreement with KIPI

           Pada tanggal 2 Desember 2021, ATBI                           On 2 December 2021, ATBI entered into a
           menandatangani Perjanjian Pinjaman sebesar                   Loan Agreement of Rp2,513,725,000,000 (full
           Rp2.513.725.000.000 (nilai penuh) dengan                     amount) with KIPI. On 17 March 2022,
           KIPI. Pada tanggal 17 Maret 2022, dilakukan                  Amendment I was made to the agreement to
           Amandemen I atas perjanjian tersebut untuk                   change the total amount of the loan facility to
           mengubah jumlah fasilitas pinjaman menjadi                   Rp2,635,725,000,000 (full amount). On 28 July
           sebesar Rp2.635.725.000.000 (nilai penuh).                   2022, Amendment II was made to the
           Pada tanggal 28 Juli 2022, dilakukan                         agreement to change the total amount of the
           Amandemen II atas perjanjian tersebut untuk                  loan facility to Rp3,184,725,000,000 (full
           mengubah jumlah fasilitas pinjaman menjadi                   amount).
           sebesar Rp3.184.725.000.000 (nilai penuh).

           Pinjaman akan digunakan antara lain untuk                    The loan will be used among others to fund the
           mendanai pembangunan, pengembangan                           construction, development and management
           dan pengelolaan kawasan industri di                          of an industrial area in North Kalimantan (the
           Kalimantan Utara (“Proyek”), pembelian tanah                 “Project”), land purchase and/or land
           dan/atau kompensasi pembebasan tanah dan                     compensation and other costs related to the
           biaya-biaya lain yang terkait dengan Proyek.                 Project. The drawdown of the loan is subject to
           Pencairan    pinjaman     bergantung    pada                 the fulfilment of certain conditions.
           pemenuhan kondisi-kondisi tertentu.

           Fasilitas pinjaman ini dikenakan suku bunga                  This loan facility bears fixed interest at a
           tetap sebesar persentase tertentu per tahun                  certain percentage per annum and will be due
           dan akan jatuh tempo dalam jangka waktu dua                  within two years from the first drawdown date
           tahun sejak tanggal dilakukannya pencairan                   of the facility. The loan facility is guaranteed by
           pinjaman pertama. Fasilitas pinjaman ini diikat              the share pledge of KIPI.
           dengan jaminan berupa gadai saham KIPI.

           Selama periode sembilan bulan yang berakhir                  For     the    nine-month           period     ended
           pada tanggal 30 September 2023, ATBI telah                   30 September 2023, ATBI has provided
           memberikan tambahan pencairan atas                           additional disbursement of loan to KIPI under
           pinjaman ke KIPI atas fasilitas pinjaman ini                 this     loan      facility        amounting       to
           sebesar Rp145.000.000.000 (nilai penuh) atau                 Rp145,000,000,000 (full amount) or equivalent
           setara dengan AS$9.589 (untuk sembilan                       to US$9,589 (for the nine-month period ended
           bulan     yang   berakhir    pada    tanggal                 30 September 2022: Rp1,929,180,000,000
           30 September 2022: Rp1.929.180.000.000                       (full amount) or equivalent to US$126,528). As
           (nilai   penuh)   atau    setara     dengan                  at 30 September 2023, the outstanding
           AS$126.528). Pada tanggal 30 September                       balance     of    this      loan      facility   was
           2023, saldo pinjaman yang terutang atas                      Rp2,179,180,000,000          (full    amount)     or
           fasilitas pinjaman ini adalah sebesar                        equivalent to US$140,357 (31 December
           Rp2.179.180.000.000 (nilai penuh) atau                       2022: Rp2,034,180,000,000 (full amount) or
           setara dengan AS$140.357 (31 Desember                        equivalent to US$129,310) (Note 14).
           2022: Rp2.034.180.000.000 (nilai penuh) atau
           setara dengan AS$129.310) (Catatan 14).
Page 162
                                       PT ADARO ENERGY INDONESIA Tbk
                                  DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                 Lampiran 5/150 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                 NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                       FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                   30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                                (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                         unless otherwise stated)

39.   PERJANJIAN     PENTING,              IKATAN,        DAN     39.   SIGNIFICANT AGREEMENTS, COMMITMENTS
      KONTINJENSI (lanjutan)                                            AND CONTINGENCIES (continued)

      z.    Perjanjian Fasilitas Sindikasi AS$860.000                   z.    US$860,000 Syndicated Facility Agreement

            Pada tanggal 3 November 2022, Kestrel Coal                        On 3 November 2022, Kestrel Coal Resources
            Resources Pty Ltd (“KCR”), entitas anak                           Pty Ltd (“KCR”), Kestrel’s subsidiary, entered
            Kestrel, menandatangani Perjanjian Fasilitas                      into a Syndicated Facility Agreement of
            Sindikasi sebesar AS$860.000 dengan                               US$860,000 with a syndicate of banks.
            sindikasi bank.

            Fasilitas berdasarkan Perjanjian Fasilitas                        The facilities under the Syndicated Facility
            Sindikasi terdiri dari amortising senior term                     Agreement consist of an amortising senior
            loan facility sebesar AS$750.000, revolving                       term loan facility of US$750,000, a revolving
            working capital facility sebesar AS$100.000,                      working capital facility of US$100,000 and a
            dan documentary credit facility sebesar                           documentary credit facility of US$10,000.
            AS$10.000. Fasilitas ini memiliki periode jatuh                   These facilities have a final maturity date of 5
            tempo akhir selama 5 tahun (untuk senior term                     years (senior term loan) and 3 years (revolving
            loan) dan 3 tahun (untuk revolving working                        working capital and documentary credit
            capital dan documentary credit facilities) dari                   facilities) after the closing date.
            tanggal penutupan.

            Fasilitas pinjaman ini digunakan untuk                            These loan facilities are used for the repayment
            pelunasan semua jumlah berdasarkan                                of all amounts under the existing senior and
            perjanjian fasilitas pinjaman senior dan                          mezzanine loan facility agreements and for
            mezzanine yang ada dan untuk keperluan                            general corporate and working capital
            korporasi umum dan modal kerja perusahaan                         purposes of the Kestrel group companies.
            grup Kestrel. Berdasarkan Perjanjian Fasilitas                    Under this Syndicated Facility Agreement,
            Sindikasi ini, KCR diwajibkan untuk menjaga                       KCR is required to maintain certain financial
            rasio keuangan tertentu dan mematuhi syarat                       ratios and to comply with the terms and
            dan ketentuan yang tercantum dalam                                conditions stated in the Syndicated Facility
            Perjanjian Fasilitas Sindikasi.                                   Agreement.

      aa.   Perjanjian Fasilitas Pinjaman Berjangka                     aa.   Rp325,000,000,000      Senior    Term    Loan
            Senior Rp325.000.000.000                                          Facility Agreement

            Pada tanggal 14 Juni 2023, DTP                                    On 14 June 2023, DTP entered into a Senior
            menandatangani       Perjanjian       Fasilitas                   Term         Loan     Facility      Agreement
            Pinjaman Berjangka Senior dengan sindikasi                        Rp325,000,000,000 (full amount) with a
            lembaga pembiayaan infrastruktur sebesar                          syndication     of  infrastructure    financing
            Rp325.000.000.000 (nilai penuh). ATM dan                          institutions. ATM and PT Adhi Karya (Persero)
            PT Adhi Karya (Persero) Tbk bertindak                             Tbk act as guarantors for this loan facility.
            sebagai penjamin atas fasilitas pinjaman ini.

            Fasilitas pinjaman ini digunakan untuk                            This loan facility is utilised to finance the
            membiayai proyek Sistem Penyediaan Air                            Dumai City Drinking Water Supply System
            Minum (“SPAM”) Kota Dumai kapasitas 450                           (“SPAM”) project with a capacity of 450 litres
            liter per detik. Fasilitas pinjaman ini dikenakan                 per second. This loan facility bears a fixed
            suku bunga tetap sebesar persentase tertentu                      interest rate of a certain percentage per
            per tahun yang terhitung sejak tanggal                            annum starting from the date of the agreement
            perjanjian hingga tahun ketujuh. Sedangkan                        until the seventh year. While the eighth year
            untuk tahun kedelapan sampai seterusnya                           onwards bears an interest rate of the Jakarta
            dikenakan suku bunga sebesar Jakarta                              Interbank Offered Rate (“JIBOR”) plus a
            Interbank Offered Rate (“JIBOR”) ditambah                         certain percentage per annum. This loan
            persentase tertentu per tahun. Fasilitas                          facility will mature within a period of sixteen
            pinjaman ini akan jatuh tempo dalam jangka                        years from the signing date of the Senior Term
            waktu enam belas tahun sejak tanggal                              Facility Loan Agreement and the instalment
            penandatanganan            Perjanjian     Fasilitas               payment is payable every six months with the
            Pinjaman Berjangka Senior dan pembayaran                          first installment in June 2025.
            angsuran akan dibayarkan setiap enam bulan
            dengan angsuran pertama pada bulan Juni
            2025.
Page 163
                                       PT ADARO ENERGY INDONESIA Tbk
                                  DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                               Lampiran 5/151 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                             (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                      unless otherwise stated)

39.   PERJANJIAN     PENTING,            IKATAN,       DAN     39.   SIGNIFICANT AGREEMENTS, COMMITMENTS
      KONTINJENSI (lanjutan)                                         AND CONTINGENCIES (continued)

       aa.    Perjanjian Fasilitas Pinjaman Berjangka                aa.   Rp325,000,000,000 Senior Term            Loan
              Senior Rp325.000.000.000 (lanjutan)                          Facility Agreement (continued)

              Pinjaman ini dijamin dengan jaminan berupa                   The loan is secured with pledge of ATM’s
              gadai atas saham ATM di DTP, jaminan gadai                   shares in DTP, pledge of DTP’s bank
              atas rekening bank DTP, jaminan fidusia atas                 accounts, fiduciary security of the proceeds of
              hasil klaim asuransi, jaminan fidusia atas                   insurance claims, fiduciary security of the
              mesin dan perlengkapan, jaminan fidusia atas                 machineries and supplies, fiduciary security of
              piutang dan hak tanggungan atas tanah dan                    the receivables and mortgages for land and
              bangunan.       Fasilitas    pinjaman      ini               buildings. This loan facility also requires DTP
              mensyaratkan DTP untuk menjaga rasio                         to maintain certain financial ratios and comply
              keuangan tertentu dan memenuhi beberapa                      with several terms and conditions stated in the
              syarat dan ketentuan yang tercantum di dalam                 loan agreement.
              perjanjian pinjaman.

      ab.     Perjanjian Pembelian Tenaga Listrik -                  ab.   Power Purchase Agreement - Tanah Laut
              Pembangkit Listrik Tenaga Bayu di Tanah                      Wind Farm
              Laut

              Pada tanggal 4 Mei 2023, Total Eren S.A.                     On 4 May 2023, Total Eren S.A. with AP and
              bersama dengan AP dan PT Pembangkitan                        PT Pembangkitan Jawa Bali Investasi signed
              Jawa     Bali  Investasi  menandatangani                     a Power Purchase Agreement with PT PLN
              Perjanjian Pembelian Tenaga Listrik dengan                   (Persero) for the Tanah Laut Wind Farm.
              PT PLN (Persero) untuk PLTB Tanah Laut.

      ac.    Peraturan Pemerintah No. 36 Tahun 2023                  ac.   Government Regulation No. 36 of 2023 (“PP
             (“PP No. 36/2023”)                                            No. 36/2023”)

             Pada tanggal 12 Juli 2023, Pemerintah                         On 12 July 2023, the Government issued PP
             menerbitkan PP No. 36/2023 tentang Devisa                     No. 36/2023 concerning Foreign Exchange
             Hasil   Ekspor   (“DHE”)    dari Kegiatan                     Export Proceeds (“DHE”) from Natural
             Pengusahaan,      Pengelolaan,   dan/atau                     Resources (“SDA”) Business Management
             Pengolahan Sumber Daya Alam (“SDA”),                          and/or Processing Activities which revoked
             dimana mencabut Peraturan Pemerintah                          the Government Regulation No. 1 of 2019 on
             Nomor 1 Tahun 2019 tentang Devisa Hasil                       Foreign Exchange Export Proceeds from
             Ekspor     dari  Kegiatan    Pengusahaan,                     Natural Resources Business, Management
             Pengelolaan, dan/atau Pengolahan Sumber                       and/or Processing Activities, became effective
             Daya Alam, dan mulai berlaku pada tanggal                     on 1 August 2023.
             1 Agustus 2023.

             PP No. 36/2023 mengatur tentang kewajiban                     PP No. 36/2023 regulates the obligation to
             memasukkan devisa berupa DHE SDA ke                           place foreign exchange in the form of DHE
             dalam sistem keuangan Indonesia melalui                       SDA into the financial system in Indonesia
             penempatan ke dalam Rekening Khusus DHE                       through placement into a DHE SDA Special
             SDA pada Lembaga Pembiayaan Ekspor                            Account at Indonesian Export Financing
             Indonesia dan/atau Bank yang Melakukan                        Institutions  and/or     Banks    Conducting
             Kegiatan Usaha dalam Valuta Asing. DHE SDA                    Business Activities in Foreign Currency. DHE
             yang telah dimasukkan dan ditempatkan ke                      SDA that has been placed into a DHE SDA
             dalam Rekening Khusus DHE SDA wajib tetap                     Special Account must remain placed at least
             ditempatkan paling sedikit sebesar 30% dan                    30% for a minimum of 3 (three) months after
             paling singkat 3 (tiga) bulan sejak penempatan                placement in the DHE SDA Special Account.
             dalam Rekening Khusus DHE SDA.
Page 164
                                       PT ADARO ENERGY INDONESIA Tbk
                                  DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                               Lampiran 5/152 Schedule

 CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
 KONSOLIDASIAN INTERIM                                                                   FINANCIAL STATEMENTS
 30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                               30 SEPTEMBER 2023 AND 31 DECEMBER 2022
 (Dinyatakan dalam ribuan Dolar AS,                                            (Expressed in thousands of US Dollars,
 kecuali dinyatakan lain)                                                                     unless otherwise stated)

 39.    PERJANJIAN     PENTING,          IKATAN,      DAN     39.   SIGNIFICANT AGREEMENTS, COMMITMENTS
        KONTINJENSI (lanjutan)                                      AND CONTINGENCIES (continued)

        ac.   Peraturan Pemerintah No. 36 Tahun 2023                 ac.   Government Regulation No. 36 of 2023 (“PP
              (“PP No. 36/2023”) (lanjutan)                                No. 36/2023”) (continued)

              AI, MIP dan MC telah melaksanakan                            AI, MIP, and MC have carried out their
              kewajibannya untuk menempatkan DHE SDA                       obligations to place DHE SDA into the DHE
              ke dalam Rekening Khusus DHE SDA                             SDA Special Account as required by the
              sebagaimana dipersyaratkan dalam peraturan                   applicable laws and regulations, and is
              perundang-undangan yang berlaku, dan                         presented as part of “Cash and Cash
              disajikan sebagai bagian dari “Kas dan Setara                Equivalents” in the interim consolidated
              Kas” dalam laporan posisi keuangan                           statements of financial position.
              konsolidasian interim.


40.    JAMINAN       REKLAMASI       DAN      PENUTUPAN       40.   RECLAMATION         GUARANTEES          AND      MINE
       TAMBANG                                                      CLOSURE

       Pada tanggal 20 Desember 2010, Pemerintah                    On 20 December 2010, the Government released an
       mengeluarkan peraturan implementasi atas Undang-             implementing regulation for Mining Law No. 4/2009,
       Undang Mineral No. 4/2009, yaitu PP No. 78 yang              i.e. GR No. 78 dealing with reclamation and post-
       mengatur aktivitas reklamasi dan pascatambang untuk          mining activities for both IUP-Exploration and
       pemegang IUP-Eksplorasi dan IUP-Operasi Produksi.            IUP-Production Operation holders. The transitional
       Ketentuan peralihan dalam PP No. 78 menegaskan               provisions in GR No. 78 make it clear that CCA/CCoW
       bahwa para pemegang PKP2B juga wajib mematuhi                holders are also required to comply with this
       peraturan ini.                                               regulation.

       Pemegang IUP-Eksplorasi, ketentuannya antara lain,           An     IUP-Exploration   holder,   among      other
       harus memuat rencana reklamasi di dalam rencana              requirements, must include a reclamation plan in its
       kerja dan anggaran biaya eksplorasinya dan                   exploration work plan and budget and provide a
       menyediakan jaminan reklamasi berupa deposito                reclamation guarantee in the form of a time deposit
       berjangka yang ditempatkan pada bank pemerintah.             placed at a state-owned bank.

       Pemegang IUP-Operasi Produksi, ketentuannya                  An IUP-Production Operation holder, among other
       antara lain, harus menyiapkan (1) rencana reklamasi          requirements, must (1) prepare a five-year
       lima    tahunan;    (2)   rencana     pascatambang;          reclamation plan; (2) prepare a post-mining plan;
       (3) menyediakan jaminan reklamasi yang dapat berupa          (3) provide a reclamation guarantee which may be in
       rekening bersama atau deposito berjangka yang                the form of a joint account or time deposit placed at a
       ditempatkan pada bank pemerintah, bank garansi,              state-owned bank, a bank guarantee, or an
       atau     cadangan     akuntansi   (bila   memenuhi           accounting provision (if it meets the requirements);
       persyaratan); dan (4) menyediakan jaminan                    and (4) provide a post-mine guarantee in the form of
       pascatambang berupa deposito berjangka yang                  a time deposit at a state-owned bank.
       ditempatkan di bank pemerintah.

       Penempatan jaminan reklamasi dan jaminan                     The requirement to provide a reclamation guarantee
       pascatambang tidak menghilangkan kewajiban                   and a post-mining guarantee does not release the IUP
       pemegang IUP dari ketentuan untuk melaksanakan               holder from the requirement to perform reclamation
       aktivitas reklamasi dan pascatambang.                        and post-mining activities.
Page 165
                                                 PT ADARO ENERGY INDONESIA Tbk
                                            DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                                  Lampiran 5/153 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                   NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                         FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                                     30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                                                  (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                                           unless otherwise stated)

40.   JAMINAN   REKLAMASI                         DAN            PENUTUPAN          40.   RECLAMATION GUARANTEES                          AND         MINE
      TAMBANG (lanjutan)                                                                  CLOSURE (continued)

      Pada tanggal 3 Mei 2018, KESDM mengeluarkan                                         On 3 May 2018, the MoEMR issued Ministerial
      Peraturan Menteri No. 26/2018 (“Permen ESDM                                         Regulation No. 26/2018 (“Permen ESDM 26/2018”)
      26/2018”) mengenai prinsip pertambangan dan                                         regarding proper mining principles and supervision
      pengawasan       yang      tepat   dalam      aktivitas                             in mineral and coal mining activities, and on 7 May
      pertambangan mineral dan batubara, dan pada                                         2018, the MoEMR issued Ministerial Decree No.
      tanggal 7 Mei 2018, KESDM mengeluarkan                                              1827 K/30/MEM/2018 (“Kepmen ESDM”) regarding
      Keputusan Menteri No. 1827 K/30/MEM/2018                                            guidelines for proper mining techniques and
      (“Kepmen ESDM”) mengenai pedoman untuk teknik                                       principles. As of the effective date of these
      dan prinsip pertambangan yang tepat. Pada tanggal                                   regulations, Ministerial Regulation No. 07/2014
      peraturan ini berlaku efektif, Peraturan Menteri                                    regarding mine reclamation and post-mining
      No. 07/2014 mengenai reklamasi dan pascatambang                                     activities in mineral and coal mining activities was
      pada kegiatan usaha pertambangan mineral dan                                        revoked and is no longer valid. From time to time, AI,
      batubara dicabut dan tidak berlaku lagi. Dari waktu ke                              the AMC entities, PC, RC, PCS, SCM, LSA, MIP,
      waktu, AI, entitas-entitas AMC, PC, RC, PCS, SCM,                                   and BEE can review or revise existing plans,
      LSA, MIP dan BEE dapat melakukan peninjauan atau                                    including reclamation and post-mining plans in
      revisi terhadap rencana-rencana yang telah ada,                                     accordance with the applicable regulations.
      termasuk diantaranya adalah rencana reklamasi dan
      pascatambang sesuai ketentuan yang berlaku.

      Kepmen ESDM No. 1827 K/30/MEM/2018                                                  Kepmen ESDM No. 1827 K/30/MEM/2018 states
      menetapkan bahwa suatu perusahaan disyaratkan                                       that a company is required to provide mine
      untuk menyediakan jaminan untuk reklamasi                                           reclamation and post-mining guarantees which may
      tambang dan pascatambang yang dapat berupa                                          be in the form of a time deposit, bank guarantee or
      deposito berjangka, jaminan bank, rekening bersama,                                 accounting reserve, all of which have a duration
      atau cadangan akuntansi yang jangka waktunya                                        corresponding to the reclamation schedule.
      sesuai dengan jadwal reklamasi.
                                      Surat Keputusan/Decree                               Jumlah penempatan/Placed amount              Bentuk/Form
         Perusahaan/                                                          Periode/     30 September         31 Desember/
            Entity             Nomor/Number                  Tanggal/Date      Period          2023            December 2022

       Dalam Rupiah (nilai penuh)/In Rupiah (full amount)

              AI               467/30/DJB/2013           19 Maret/March       2013-2017    Rp411,827,271,342   Rp290,641,204,683   Bank garansi/
                                                               2013                                                                  Bank guarantees
                              629/30/DJB/2013             12 April 2013
                             968/37.03/DBT/2014           23 April 2014
                              674/30/DJB/2014             25 April 2014
                              1178/30/DJB/2015           27 Juli/July 2015
                              755/30/DJB/2016           27 Mei/May 2016
                              1153/30/DJB/2017          31 Mei/May 2017
                              2776/30/DJB/2017            29 Desember/        2018-2022
                                                         December 2017
                             576/37.06/DJB/2018          21 Maret/March
                                                               2018
                             666/37.06/DJB/2019            27 Februari/       2019-2022
                                                          February 2019
                             1120/37.06/DJB/2019        17 Juni/June 2019
                             221/37.06/DJB/2020             7 Februari/         2020
                                                          February 2020
                             121/37/DBT.PL/2020         11 Mei/May 2020       2013-2019
                                B-1942/MB.07/           20 Mei/May 2021       2013-2020
                                 DBT.PL/2021
                              B-77/MB.07/DJB.T/         6 Januari/January     2014-2020
                                    2022                      2022

                                B-3252/MB.07/           17 Juni/June 2022       2021
                                 DBT.PL/2022
                                T-485/MB.07/                      12          2014-2021
                                 MEM.B/2022                 Oktober/October
                                                                 2022
                                 T-231/MB.07/               14 Maret/March    2023-2027
                                 MEM.B/2023                      2023

             MIP              540/625/Pertamb/          30 Juni/June 2014     2014-2018      Rp1,502,688,591     Rp1,502,688,591   Deposito bersama pada
                                    2014                                                                                           bank pemerintah/
                              540/3495/DESDM/                31 Desember/     2019-2023      Rp7,003,825,910     Rp1,723,492,263   Joint time deposits at a
                                  IV-1/2019                 December 2019                                                          state-owned bank


             BEE                  540/2626/                  13 September     2016-2017       Rp319,735,106       Rp319,735,106    Deposito bersama pada
                              Dispertamben/2016                  2016                                                              bank pemerintah/
                                                                                                                                   Joint time deposits at a
                                                                                                                                   state-owned bank
Page 166
                                                 PT ADARO ENERGY INDONESIA Tbk
                                            DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                                Lampiran 5/154 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                         NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                               FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                                           30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                                                        (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                                                 unless otherwise stated)

40.   JAMINAN   REKLAMASI                         DAN         PENUTUPAN                 40.     RECLAMATION GUARANTEES                          AND        MINE
      TAMBANG (lanjutan)                                                                        CLOSURE (continued)

                                      Surat Keputusan/Decree                                       Jumlah penempatan/Placed amount
        Perusahaan/                                                                Periode/       30 September         31 Desember/
           Entity              Nomor/Number               Tanggal/Date              Period            2023            December 2022            Bentuk/Form

      Dalam Rupiah (nilai penuh) (lanjutan)/In Rupiah (full amount) (continued)

             KC               935/30/DJB/2015          26 Juni/June 2015          2015-2016       Rp1,728,181,592     Rp1,728,181,592     Deposito berjangka/
                            1049/37.06/DJB.2018        25 Juni/June 2018          2018-2019                                                 Time deposits
                            1228/37.06/DJB/2019         5 Juli/July 2019          2019-2020

            SBC               938/30/DJB/2015          26 Juni/June 2015          2015-2016       Rp1,577,857,027     Rp1,577,857,027     Deposito berjangka/
                            1240/37.06/DJB/2019         8 Juli/July 2019          2019-2020                                                  Time deposits

             JC             1048/37.06/DJB.2018        25 Juni/June 2018          2018-2019       Rp4,722,665,500     Rp4,722,665,500     Deposito berjangka/
                            1227/37.06/DJB/2019         5 Juli/July 2019          2019-2020                                                 Time deposits


             LC             B-1406/MB.07/DJB.T/            4 April 2022              2022         Rp2,555,416,000     Rp2,555,416,000     Deposito berjangka/
                                   2022                                                                                                     Time deposits


             PC             1051/37.06/DJB/2018        25 Juni/June 2018          2019-2020       Rp2,981,083,800     Rp2,981,083,800     Deposito berjangka/
                            B-1556/MB.07/DJB.T/          28 Desember/             2022-2023                                                 Time deposits
                                   2021                 December 2021

             RC             1047/37.06/DJB/2018        25 Juni/June 2018          2019-2020       Rp1,290,635,000     Rp1,290,635,000     Deposito berjangka/
                            B-1064/MB.07/DJB.T/         10 Maret/March            2022-2023                                                 Time deposits
                                   2022                      2022


            SCM              1641/30/DJB/2016          17 November 2016           2014-2018                     -    Rp12,459,774,709     Bank garansi/
                             2588/30/DJB/2017          30 November 2017           2017-2018                                                 Bank guarantees
                            1983/37.06/DJB/2018        23 November 2018           2014-2017
                            2309/37.06/DJB/2018           21 Desember/              2018
                                                         December 2018
                            1526/37.06/DJB/2019           11 September            2019-2023
                                                              2019
                            1164/37/DBT.PL/2020         3 November 2020           2014-2018       Rp4,028,674,700     Rp1,942,266,000     Deposito berjangka/
                             T-7/MB.07/MEM.B                3 Januari/            2014-2018,                                                Time deposits
                                   /2023                  January 2023               2023

            LSA              1622/30/DJB/2016          24 November 2016            2016-2020                    -    Rp39,185,184,492     Bank garansi/
                             2583/30/DJB/2017          30 November 2017            2017-2020                                                Bank guarantees
                            1913/37.06/DJB/2018        14 November 2018           2016, 2018-
                                                                                     2020
                             15/37.03/DBT/2020             6 Januari/              2019-2020
                                                         January 2020
                                     B-                 20 Mei/May 2021           2016, 2018-
                             1942/MB.07/DBT.PL/                                      2020
                                    2021                   9 April 2021            2021-2025      Rp8,348,994,000     Rp7,915,398,000     Deposito berjangka/
                              789/MB.07.09/DJB/                                                                                             Time deposits
                                    2021
                                                          7 Desember/             2016-2020,
                            T-813/MB.07/MEM.B/           December 2022               2021
                                   2022

            PCS              1640/30/DJB/2016          17 November 2016           2018-2022                     -                     -   Bank garansi/
                            1240/37.06/DJB/2018         27 Juli/July 2018         2018-2022                                                 Bank guarantees
                            2006/37.06/DJB/2019        26 November 2019           2019-2022      Rp25,192,258,187    Rp25,192,258,187     Deposito berjangka/
                                                                                                                                            Time deposits
                            T-812/MB.07/MEM.B/            7 Desember/                2022
                                   2022                  December 2022

      Dalam ribuan AS Dolar/In thousands of US Dollars

             LC               2609/30/DJB/2017             6 Desember/            2018-2021             US$3,273            US$3,273      Bank garansi/
                                                         December 2017                                                                      Bank guarantees
                            121/37/DBT.PL/2020          11 Mei/May 2020             2019
                            2244/37.06/DJB/2019           26 Desember/            2016-2018
                                                         December 2019
                             198/37.06/DJB/2020             5 Februari/           2020-2021
                                                          February 2020
                            1164/37/DBT.PL/2020         3 November 2020           2016-2018,
                                                                                     2020
                               B-1942/MB.07/            20 Mei/May 2021           2019-2020
                                DBT.PL/2021
                               B-5373/MB.07/           14 November 2021           2016-2020
                                DBT.PL/2021
                               B-3252/MB.07/           17 Juni/June 2022             2021
                                DBT.PL/2022
                            B-6865/MB.07/DBT.PL        25 November 2022           2016-2021
                                   /2022
Page 167
                                                 PT ADARO ENERGY INDONESIA Tbk
                                            DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                                  Lampiran 5/155 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                       NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                             FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                                         30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                                                      (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                                               unless otherwise stated)

40.   JAMINAN   REKLAMASI                         DAN           PENUTUPAN              40.   RECLAMATION GUARANTEES                           AND         MINE
      TAMBANG (lanjutan)                                                                     CLOSURE (continued)

                                      Surat Keputusan/Decree                                    Jumlah penempatan/Placed amount
         Perusahaan/                                                           Periode/         30 September        31 Desember/
            Entity             Nomor/Number                  Tanggal/Date       Period              2023           December 2022             Bentuk/Form

       Dalam ribuan AS Dolar/In thousands of US Dollars

              MC              2755/30/DJB/2017             28 Desember/        2017-2021              US$11,098         US$11,098      Bank garansi/
                                                          December 2017                                                                  Bank guarantees
                               B-1942/MB.07/              20 Mei/May 2021      2019-2020
                                DBT.PL/2021
                               B-5373/MB.07/           14 November 2021        2017-2020
                                DBT.PL/2021
                               B-3252/MB.07/            17 Juni/June 2022        2021
                                DBT.PL/2022
                            B-6865/MB.07/DBT.PL        25 November 2022        2017-2021
                                   /2022
                            B-1404/MB.07/DJB.T/               4 April 2022     2022-2026                                               Deposito berjangka/
                                    2022                                                               US$4,715          US$1,680        Time deposits


              PC             CCoW pasal/article 7                   -              -                    US$100             US$100      Deposito berjangka/
                             1352/87.04/SDP/1999            8 Juli/July 1999                                                             Time deposits


             SBC              513/MB.07.09/DJB/             5 Maret/March      2020-2024                US$158             US$158      Deposito berjangka/
                                    2021                        2021                                                                     Time deposits


              KC             537/37.06.DJB/2020             30 April 2020      2020-2024                US$499             US$499      Bank garansi/
                             1476/37.06/DJB/2020            8 Desember/        2021-2024                                                 Bank guarantees
                                                          December 2020
                               B-1942/MB.07/              20 Mei/May 2021        2020
                                DBT.PL/2021
                               B-5373/MB.07/           14 November 2021          2020
                                DBT.PL/2021
                            B-6865/MB.07/DBT.PL        25 November 2022          2020
                                   /2022

              JC             589/37.06/DJB/2020           13 Mei/May 2020      2020-2024               US$1,963          US$1,963      Bank garansi/
                             1477/37.06/DJB/2020            8 Desember/        2021-2024                                                 Bank guarantees
                                                          December 2020
                               B-1942/MB.07/              20 Mei/May 2021        2020
                                DBT.PL/2021
                               B-5373/MB.07/           14 November 2021          2020
                                DBT.PL/2021
                            B-6865/MB.07/DBT.PL        25 November 2022          2020
                                   /2022


      Tabel   dibawah   ini   menunjukkan      jaminan                                       The below table sets out post-mining guarantees that
      pascatambang yang diwajibkan dan ditempatkan                                           are required and have been placed by the Group as
      oleh Grup pada tanggal 30 September 2023 dan                                           at 30 September 2023 and 31 December 2022:
      31 Desember 2022 adalah sebagai berikut:


                                      Surat Keputusan/Decree                                    Jumlah penempatan/Placed amount
       Perusahaan/                                                              Periode/       30 September         31 Desember/
          Entity              Nomor/Number                   Tanggal/Date        Period            2023            December 2022            Bentuk/Form

       Dalam Rupiah (nilai penuh)/In Rupiah (full amount)

            MIP              540/1042/Pertamb/              2 Juni/June 2010   2012-2020       Rp18,581,766,188   Rp18,581,766,188     Deposito bersama pada
                                   2010                                                                                                  bank pemerintah/
                                                                                                                                         Joint time deposits at
                                                                                                                                         a state-owned bank
                            T-243/MB.07/MEM.B/              15 Maret/March     2021-2028        Rp3,435,103,492                    -
                                   2023                         2023

            BEE             545/1181/Tamben-II/         22 November 2011       2014-2038        Rp6,249,876,209    Rp6,249,876,209     Deposito bersama pada
                                   2011                                                                                                  bank pemerintah/
                                                                                                                                         Joint time deposits at
                                                                                                                                         a state-owned bank

            SCM           1042/MB.07.09/DJB/2021            4 Mei/May 2021     2021-2027        Rp4,098,575,897    Rp2,235,586,853     Deposito berjangka/
                                                                                                                                         Time deposits

            LSA           1040/MB.07.09/DJB/2021            4 Mei/May 2021     2021-2032        Rp5,745,610,727    Rp2,528,068,720     Deposito berjangka/
                                                                                                                                         Time deposits

            PCS             B-1056/MB.07/DJB.T/         28 Oktober/October     2020-2029        Rp1,644,379,974      Rp896,934,531     Deposito berjangka/
                                   2021                        2021                                                                      Time deposits

       Dalam ribuan AS Dolar/In thousands of US Dollars

             LC               825/30/DJB/2016               8 Juni/June 2016   2016-2018              US$4,901           US$4,901      Deposito berjangka/
                                                                                                                                         Time deposits

            MC                627/37/DJB/2019                 19 Februari/     2020-2026              US$5,458           US$2,669      Deposito berjangka/
                                                             February 2019                                                               Time deposits

             AI               279/30/DJB/2013                 14 Februari/     2014-2020             US$27,960          US$27,960      Deposito berjangka/
                                                             February 2013                                                               Time deposits
Page 168
                                        PT ADARO ENERGY INDONESIA Tbk
                                   DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                  Lampiran 5/156 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                   NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                         FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                     30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                                  (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                           unless otherwise stated)

41.   ASET DAN LIABILITAS KEUANGAN                                 41.   FINANCIAL ASSETS AND LIABILITIES

      Pada tanggal 30 September 2023, Grup                               As at 30 September 2023, the Group classified its
      mengklasifikasikan kas dan setara kas, piutang                     cash and cash equivalents, trade receivables, other
      usaha, piutang lain-lain, kas dan deposito berjangka               receivables, restricted cash and time deposits, loans
      yang dibatasi penggunaannya, pinjaman untuk pihak                  to third parties, loans to related parties, other current
      ketiga, pinjaman untuk pihak berelasi, aset lancar                 assets, service concession receivables, receivables
      lain-lain, piutang jasa konsesi, piutang dari                      from non-controlling interest and other non-current
      kepentingan non-pengendali dan aset tidak lancar                   assets amounting to US$4,347,550 (31 December
      lain-lain sebesar AS$4.347.550 (31 Desember 2022:                  2022: US$5,205,443) as financial assets at
      AS$5.205.443) sebagai aset keuangan yang diukur                    amortised cost and financial assets at FVOCI and
      pada biaya perolehan diamortisasi dan aset                         FVTPL amounting to US$479,239 (31 December
      keuangan pada nilai wajar melalui penghasilan                      2022: US$483,921) and US$73,737 (31 December
      komprehensif lain dan melalui laba rugi masing-                    2022: US$99,219), respectively.
      masing sebesar AS$479.239 (31 Desember 2022:
      AS$483.921) dan AS$73.737 (31 Desember 2022:
      AS$99.219).

      Pada tanggal 30 September 2023, Grup                               As at 30 September 2023, the Group classified its
      mengklasifikasikan utang usaha, utang dividen,                     trade payables, dividends payable, accrued
      beban yang masih harus dibayar, pinjaman dari pihak                expenses, loans from third parties, other liabilities,
      ketiga, utang lain-lain, liabilitas sewa, utang bank dan           lease liabilities, bank loans and Senior Notes
      Senior Notes sebesar AS$2.237.990 (31 Desember                     amounting to US$2,237,990 (31 December 2022:
      2022: AS$2.621.529) sebagai liabilitas keuangan                    US$2,621,529) as financial liabilities carried at
      yang diukur pada biaya perolehan diamortisasi.                     amortised cost.


42.   MANAJEMEN RISIKO KEUANGAN                                    42.   FINANCIAL RISK MANAGEMENT

      Berbagai aktivitas yang dilakukan membuat Grup                     The Group’s activities are exposed to a variety of
      terekspos terhadap berbagai risiko keuangan: risiko                financial risks: market risk (including the effects of
      pasar (termasuk dampak risiko nilai tukar mata uang                foreign currency exchange rate risk, commodity price
      asing, risiko tingkat harga komoditas, dan risiko                  risk and interest rate risk), credit risk and liquidity risk.
      tingkat suku bunga), risiko kredit, dan risiko likuiditas.         The objectives of the Group’s risk management
      Tujuan dari proses manajemen risiko Grup adalah                    processes are to identify, measure, monitor and
      untuk mengidentifikasi, mengukur, mengawasi, dan                   manage key risks in order to safeguard the Group’s
      mengelola risiko dasar dalam upaya melindungi                      long-term business continuity and to minimise
      kesinambungan bisnis dalam jangka panjang dan                      potential adverse effects on the financial performance
      meminimalkan dampak yang tidak diharapkan pada                     of the Group.
      kinerja keuangan Grup.

      Grup menggunakan berbagai metode untuk                             The Group uses various methods to measure the risk
      mengukur risiko yang dihadapinya. Metode ini                       to which it is exposed. These methods include
      meliputi analisis sensitivitas untuk risiko tingkat suku           sensitivity analysis in the case of interest rates,
      bunga, nilai tukar dan risiko harga lainnya dan                    foreign exchange and other price risks and aging
      analisis umur piutang untuk risiko kredit.                         analysis for credit risk.

      (1) Faktor risiko keuangan                                         (1) Financial risk factors

           a.   Risiko pasar                                                   a.   Market risk

                (i)   Risiko nilai tukar mata uang asing                            (i)   Foreign exchange risk

                      Pembiayaan dan sebagian besar                                       The financing and the majority of the
                      pendapatan dan pengeluaran operasi                                  revenue and operating expenditure of
                      dari entitas anak yang beroperasi dari                              the operating subsidiaries of the
                      Perusahaan didenominasi dalam mata                                  Company are denominated in US
                      uang Dolar AS, yang secara tidak                                    Dollars, which indirectly represents a
                      langsung merupakan lindung nilai alami                              natural hedge on exposure to
                      (natural hedging) terhadap eksposur                                 fluctuations in foreign exchange rates.
                      fluktuasi nilai tukar mata uang asing.                              However, the Group is exposed to
                      Namun, Grup memiliki eksposur                                       foreign exchange risk arising from
                      terhadap risiko mata uang asing yang                                dividend payments to the shareholders
                      timbul dari pembayaran dividen kepada                               and other operating expenses in
                      pemegang saham dan biaya operasi                                    Rupiah.
                      lainnya dalam mata uang Rupiah.
Page 169
                                        PT ADARO ENERGY INDONESIA Tbk
                                   DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                 Lampiran 5/157 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                 NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                       FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                   30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                                (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                         unless otherwise stated)

42.   MANAJEMEN RISIKO KEUANGAN (lanjutan)                        42.   FINANCIAL RISK MANAGEMENT (continued)

      (1) Faktor risiko keuangan (lanjutan)                             (1) Financial risk factors (continued)

          a.   Risiko pasar (lanjutan)                                      a.   Market risk (continued)

               (i)   Risiko nilai tukar mata uang asing                          (i)   Foreign exchange risk (continued)
                     (lanjutan)

                     Manajemen telah membuat kebijakan                                 Management has set up a policy to
                     untuk mengelola risiko nilai tukar mata                           require companies within the Group to
                     uang asing terhadap mata uang                                     manage their foreign exchange risk
                     fungsional perusahaan dalam Grup.                                 against their functional currency. As at
                     Pada tanggal 30 September 2023, jika                              30 September 2023, if the Rupiah had
                     Rupiah melemah/menguat sebesar                                    weakened/strengthened            by 10%
                     10% terhadap Dolar AS dengan semua                                against the US Dollar with all other
                     variabel      konstan,     laba   setelah                         variables held constant, the post-tax
                     pajak dalam periode berjalan akan                                 profit for the period would have been
                     menjadi lebih rendah AS$23.857                                    US$23,857 lower or US$29,159 higher
                     atau menjadi lebih tinggi AS$29.159                               (31 December 2022: US$31,090 lower
                     (31 Desember 2022: lebih rendah                                   or US$37,998 higher), respectively,
                     AS$31.090 atau menjadi lebih tinggi                               mainly as a result of foreign exchange
                     AS$37.998), terutama diakibatkan                                  gains/losses on the translation of cash
                     penjabaran           keuntungan/kerugian                          and cash equivalents, restricted cash
                     translasi kas dan setara kas, kas dan                             and time deposits, trade receivables,
                     deposito berjangka yang dibatasi                                  other investments, loans to third
                     penggunaannya,          piutang    usaha,                         parties, loans to related parties, other
                     investasi lain-lain, pinjaman untuk pihak                         non-current assets, trade payables,
                     ketiga, pinjaman untuk pihak berelasi,                            accrued expenses, bank loan, lease
                     aset tidak lancar lain-lain, utang usaha,                         liabilities and other liabilities.
                     beban yang masih harus dibayar, utang
                     bank, liabilitas sewa dan utang lain-lain.

               (ii) Risiko harga                                                 (ii) Price risk

                     Operasi Grup terekspos terhadap risiko                            The Group’s operations are exposed to
                     pasar terkait dengan fluktuasi harga                              market risks related to the price
                     dari       harga    komoditas    yang                             volatility of commodity prices traded on
                     diperdagangkan di pasar batubara                                  world coal markets. However, the
                     dunia. Namun demikian, aset dan                                   Group’s financial assets and liabilities
                     liabilitas    keuangan   Grup    tidak                            are not significantly exposed to the
                     terekspos secara signifikan terhadap                              price volatility of world coal markets
                     fluktuasi harga batubara dunia karena                             because the settlement of financial
                     penyelesaian aset dan liabilitas                                  assets and liabilities is based on the
                     keuangan berdasarkan harga yang                                   prices stipulated in the coal sales and
                     tercantum dalam kontrak jual beli                                 purchase agreements that will be
                     batubara yang ditentukan pada saat                                determined at the time of delivery.
                     pengiriman.

                     Grup terekspos risiko harga yang                                  The Group is exposed to price risk from
                     berasal dari investasi yang dicatat                               investments that are carried at FVTPL
                     sebesar nilai wajar melalui laba rugi                             or financial assets at FVOCI and
                     atau aset keuangan pada nilai wajar                               FVTPL.
                     melalui penghasilan komprehensif lain
                     dan melalui laba rugi.
Page 170
                                      PT ADARO ENERGY INDONESIA Tbk
                                 DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                               Lampiran 5/158 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                 30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                              (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                       unless otherwise stated)

42.   MANAJEMEN RISIKO KEUANGAN (lanjutan)                      42.   FINANCIAL RISK MANAGEMENT (continued)

      (1) Faktor risiko keuangan (lanjutan)                           (1) Financial risk factors (continued)

          a.   Risiko pasar (lanjutan)                                    a.   Market risk (continued)

               (ii) Risiko harga (lanjutan)                                    (ii) Price risk (continued)

                   Untuk mengelola risiko harga yang                               To manage price risk arising from
                   timbul dari investasi pada efek utang,                          investments in debt securities, the
                   Grup melakukan analisa terkait                                  Group performs an analysis of the
                   besarnya      bunga     kupon     yang                          coupon rates offered on bonds and the
                   ditawarkan pada obligasi dan tingkat                            required rate of return that is generally
                   imbal hasil yang secara umum                                    expected by the market. To manage the
                   diharapkan      oleh   pasar.    Untuk                          price risk arising from investments in
                   mengelola risiko harga yang timbul dari                         unlisted    securities,    the     Group
                   investasi      efek     yang       tidak                        diversifies     its    portfolio.    The
                   diperdagangkan di bursa, Grup                                   performance         of   the      Group’s
                   melakukan diversifikasi portofolionya.                          investments at FVTPL or FVOCI is
                   Kinerja investasi Grup yang diukur                              monitored periodically.
                   pada nilai wajar melalui laba rugi atau
                   melalui penghasilan komprehensif lain
                   dimonitor secara periodik.

                   Pada tanggal 30 September 2023,                                 As at 30 September 2023, if the price of
                   apabila harga atas investasi lain-lain                          the Group’s other investments at
                   Grup yang diukur pada nilai wajar                               FVTPL or FVOCI had been 5%
                   melalui laba rugi atau melalui                                  higher/lower with all other variables
                   penghasilan komprehensif lain 5%                                held constant, total equity would have
                   lebih tinggi atau lebih rendah dengan                           increased or decreased by US$27,649
                   asumsi      variabel    lainnya  tidak                          (31 December 2022: US$30,246).
                   mengalami perubahan, maka total
                   ekuitas akan naik atau turun sebesar
                   AS$27.649 (31 Desember 2022:
                   AS$30.246).

               (iii) Risiko suku bunga                                         (iii) Interest rate risk

                   Risiko suku bunga Grup terutama                                 The Group’s interest rate risk
                   timbul dari pinjaman jangka panjang                             arises from long-term borrowings
                   dalam mata uang Dolar AS. Risiko suku                           denominated in US Dollars. The
                   bunga dari kas tidak signifikan dan                             interest rate risk on cash is not
                   semua instrumen keuangan lainnya                                significant and all other financial
                   tidak dikenakan bunga. Pinjaman yang                            instruments are not interest bearing.
                   diterbitkan dengan tingkat bunga                                Borrowings issued at variable rates
                   variabel mengekspos Grup terhadap                               expose the Group to cash flow interest
                   risiko suku bunga arus kas.                                     rate risk.

                    Grup menganalisis eksposur dari risiko                         The Group analyses its interest rate
                    bunga secara dinamis. Beberapa                                 exposure on a dynamic basis. Various
                    skenario      disimulasikan     dengan                         scenarios are simulated taking into
                    beberapa       pertimbangan      seperti                       consideration the refinancing of
                    pembiayaan kembali, memperbaharui                              existing positions, and alternative
                    dari kondisi yang ada dan alternatif lain                      financing. Based on the above
                    pembiayaan. Berdasarkan skenario                               scenarios, the Group manages its cash
                    tersebut diatas, Grup mengelola risiko                         flows interest rate risk by refinancing
                    arus kas dari suku bunga dengan                                borrowings at a lower interest rate.
                    melakukan pembiayaan pinjaman
                    dengan suku bunga yang lebih rendah.

                    Pada tanggal 30 September 2023, jika                           As at 30 September 2023, if interest
                    tingkat suku bunga atas pinjaman                               rates on long-term borrowings had
                    jangka panjang 10 basis poin lebih                             been 10 basis points higher/lower with
                    tinggi/lebih rendah, dengan asumsi                             all other variables held constant, the
                    semua variabel lain konstan, laba                              post-tax profit for the period would have
                    setelah pajak untuk periode berjalan                           been US$772 (31 December 2022:
                    akan menjadi lebih rendah/tinggi                               US$620) lower/higher.
                    sebesar AS$772 (31 Desember 2022:
                    AS$620).
Page 171
                                      PT ADARO ENERGY INDONESIA Tbk
                                 DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/159 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                             (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                      unless otherwise stated)

42.   MANAJEMEN RISIKO KEUANGAN (lanjutan)                     42.   FINANCIAL RISK MANAGEMENT (continued)

      (1) Faktor risiko keuangan (lanjutan)                          (1) Financial risk factors (continued)

          b.   Risiko kredit                                             b.    Credit risk

               Pada tanggal 30 September 2023, total                           As at 30 September 2023, the total
               maksimum eksposur dari risiko kredit adalah                     maximum exposure from credit risk was
               AS$4.900.473       (31 Desember 2022:                           US$4,900,473 (31 December 2022:
               AS$5.788.537). Risiko kredit terutama                           US$5,788,537). Credit risk arises from cash
               berasal dari kas di bank, deposito                              in banks, time deposits, financial assets at
               berjangka, aset keuangan pada nilai wajar                       FVOCI and FVTPL, trade receivables, other
               melalui penghasilan komprehensif lain dan                       receivables, restricted cash and time
               melalui laba rugi, piutang usaha, piutang                       deposits, loans to third parties, loans to
               lain-lain, kas dan deposito berjangka yang                      related parties, other current assets, service
               dibatasi penggunaannya, pinjaman untuk                          concession receivables and other non-
               pihak ketiga, pinjaman untuk pihak berelasi,                    current assets.
               aset lancar lain-lain, piutang jasa konsesi
               dan aset tidak lancar lain-lain.

               Semua kas di bank, deposito berjangka, kas                      All the cash in banks, time deposits,
               dan deposito berjangka yang dibatasi                            restricted cash and time deposits are placed
               penggunaannya ditempatkan di bank asing                         in reputable foreign and local banks.
               dan lokal yang memiliki reputasi.

               Grup mengelola risiko kredit yang terkait                       The Group manages credit risk exposure
               dengan aset keuangan pada nilai wajar                           from its financial assets at FVOCI and
               melalui penghasilan komprehensif lain dan                       FVTPL by monitoring the reputation and
               laba rugi dengan memonitor reputasi,                            credit    ratings    of    each     individual
               peringkat kredit dan menekan risiko agregat                     counterparty. The credit quality of financial
               dari masing-masing pihak dalam kontrak.                         assets at FVOCI and FVTPL in listed
               Kualitas kredit dari aset keuangan pada nilai                   securities can be assessed by reference to
               wajar melalui penghasilan komprehensif lain                     external credit ratings as follows:
               dan laba rugi yang diperdagangkan di bursa
               yang dapat diambil dari referensi peringkat
               kredit eksternal adalah sebagai berikut:

                                         30 September           31 Desember/
                                             2023              December 2022

               Dengan pihak yang
                 memiliki Peringkat
                 kredit eksternal                                                              Counterparties with external
                 (Fitch dan Moody’s):                                                 credit ratings (Fitch and Moody’s):
                   BBB / Baa2                        4,878              5,055                               BBB / Baa2

               Manajemen yakin akan kemampuannya                               Management is confident in its ability to
               untuk     terus    mengendalikan     dan                        continue to control and maintain minimal
               mempertahankan eksposur yang minimal                            exposure to credit risk, since the Group has
               terhadap risiko kredit mengingat Grup                           clear policies on the selection of customers,
               memiliki kebijakan yang jelas dalam                             legally binding agreements in place for coal
               pemilihan pelanggan, perjanjian yang                            sales, mining services and other services
               mengikat secara hukum untuk penjualan                           rendered, and historically low levels of bad
               batubara, jasa penambangan, dan jasa                            debts in trade receivables.
               lainnya yang telah dilakukan, dan secara
               historis mempunyai tingkat yang rendah
               untuk piutang usaha yang bermasalah.
Page 172
                                        PT ADARO ENERGY INDONESIA Tbk
                                   DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/160 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                             (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                      unless otherwise stated)

42.   MANAJEMEN RISIKO KEUANGAN (lanjutan)                     42.   FINANCIAL RISK MANAGEMENT (continued)

      (1) Faktor risiko keuangan (lanjutan)                          (1) Financial risk factors (continued)

          b.   Risiko kredit (lanjutan)                                  b.   Credit risk (continued)

               Kebijakan umum Grup untuk penjualan                            The Group’s general policies for coal sales
               batubara dan pemberian jasa untuk                              and rendering services to new and existing
               pelanggan yang sudah ada dan pelanggan                         customers are as follows:
               baru adalah sebagai berikut:

               -   memilih pelanggan (pada umumnya                            -   selecting customers (mostly blue chip
                   adalah perusahaan pembangkit listrik                           power plant companies) with strong
                   unggulan) dengan kondisi keuangan                              financial    conditions and     good
                   yang kuat dan reputasi yang baik.                              reputations.

               -   menerima     pelanggan   baru dan                          -   acceptance of new customers and sales
                   penjualan batubara serta pemberian                             of coal and rendering services being
                   jasa disetujui oleh pihak yang                                 approved by the authorised personnel
                   berwenang sesuai dengan kebijakan                              according to the Group’s delegation of
                   delegasi kekuasaan Grup.                                       authority policy.

               -   meminta      pembayaran     dengan                         -   requesting payments by Letter of Credit
                   menggunakan Letter of Credit untuk                             for new customers.
                   pelanggan baru.

               Seluruh saldo terutang dari piutang usaha,                     The entire outstanding balances from trade
               piutang lain-lain, pinjaman untuk pihak                        receivables, other receivables, loans to third
               ketiga, pinjaman untuk pihak berelasi, aset                    parties, loans to related parties, other
               lancar lain-lain, piutang jasa konsesi dan                     current     assets,    service    concession
               aset tidak lancar lain-lain di atas terutama                   receivables and other non-current assets
               berasal dari pelanggan/pihak ketiga/pihak                      are mostly derived from customers/third
               berelasi yang sudah bertransaksi dengan                        parties/related     parties    which    have
               Grup lebih dari 12 bulan dan tidak memiliki                    transacted with the Group for more than 12
               sejarah wanprestasi yang material.                             months and do not have any history of
                                                                              material default.

          c.   Risiko likuiditas                                         c.   Liquidity risk

               Risiko likuiditas merupakan risiko yang                        Liquidity risk is defined as a risk that arises
               muncul dalam situasi dimana posisi arus kas                    in situations where the cash inflow from
               Grup mengindikasikan bahwa arus kas                            short-term revenue is not enough to cover
               masuk dari pendapatan jangka pendek tidak                      the cash outflow of short-term expenditure.
               cukup untuk memenuhi arus kas keluar                           To manage its liquidity risk, the Group
               untuk pengeluaran jangka pendek. Untuk                         monitors its level of cash and cash
               mengatur risiko likuiditas, Grup memonitor                     equivalents and maintains these at a level
               dan menjaga tingkat kas dan setara kas                         deemed adequate to finance the Group’s
               yang diperkirakan cukup untuk mendanai                         operational activities and to mitigate the
               kegiatan operasional Grup dan mengurangi                       effect of fluctuations in cash flow. The
               pengaruh fluktuasi arus kas. Manajemen                         Group’s management also regularly
               Grup juga secara rutin memonitor perkiraan                     monitors projected and actual cash flow,
               arus kas dan arus kas aktual, termasuk profil                  including loan maturity profiles and
               jatuh tempo pinjaman, dan secara terus-                        continuously assesses the financial markets
               menerus menilai kondisi pasar keuangan                         for opportunities to raise funds. In addition,
               untuk kesempatan memperoleh dana.                              the Group has a standby loan facility that
               Sebagai tambahan, Grup juga mengatur                           can be drawn down upon request to fund its
               untuk memiliki fasilitas stand-by loan yang                    operations as and when needed.
               dapat ditarik sesuai dengan permintaan
               untuk mendanai kegiatan operasi pada saat
               diperlukan.
Page 173
                                              PT ADARO ENERGY INDONESIA Tbk
                                         DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                    Lampiran 5/161 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                           NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                 FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                             30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                                          (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                                   unless otherwise stated)

42.   MANAJEMEN RISIKO KEUANGAN (lanjutan)                             42.       FINANCIAL RISK MANAGEMENT (continued)

      (1) Faktor risiko keuangan (lanjutan)                                      (1) Financial risk factors (continued)

          c. Risiko likuiditas (lanjutan)                                                    c. Liquidity risk (continued)

             Tabel dibawah ini menganalisa liabilitas                                           The table below analyses the Group’s
             keuangan Grup pada tanggal pelaporan                                               financial liabilities at the reporting date into
             berdasarkan kelompok jatuh temponya dari                                           relevant maturity groupings based on the
             sisa periode hingga tanggal jatuh tempo                                            remaining period to the contractual maturity
             kontraktual. Jumlah yang diungkapkan dalam                                         date. The amounts disclosed in the table
             tabel ini adalah nilai arus kas kontraktual                                        represent contractual undiscounted cash
             yang tidak terdiskonto termasuk estimasi                                           flows including estimated interest payments:
             pembayaran bunga:
                                                                       Lebih dari tiga          Lebih dari satu
                                                                         bulan dan                tahun dan
                                                                      kurang dari satu         kurang dari lima
                                                                      tahun/More than          tahun/More than
                                                 Kurang dari tiga    three months and          one year and not       Lebih dari lima
                                                 bulan/Less than        not later than            later than           tahun/More than
                                                  three months            one year                five years              five years         Total

             30 September 2023
             Liabilitas keuangan/
             Financial liabilities
             Utang usaha/Trade payables                    418,016                       -                        -                      -       418,016
             Beban yang masih harus dibayar/
                Accrued expenses                           139,865                   -                        -                       -          139,865
             Utang dividen/Dividend payable                  1,980                   -                        -                       -            1,980
             Utang lain-lain/Other liabilities              17,847                   -                        -                       -           17,847
             Liabilitas sewa/Lease liabilities               7,698              18,182                   65,414                   1,922           93,216
             Utang bank/Bank loans                          84,291             245,894                  636,649                 131,832        1,098,666
             Senior Notes                                   15,938              15,938                  765,938                       -          797,814

             Total                                         685,635             280,014                 1,468,001                133,754        2,567,404

             31 Desember/December 2022
             Liabilitas keuangan/
             Financial liabilities
             Utang usaha/Trade payables                    333,212                       -                        -                      -       333,212
             Utang dividen/Dividends payable               532,495                       -                        -                      -       532,495
             Beban yang masih harus dibayar/
                Accrued expenses                            94,053                       -                        -                      -           94,053
             Utang lain-lain/Other liabilities               9,121                       -                        -                      -            9,121
             Pinjaman dari pihak ketiga/
                Loans from third parties                         -                 265                    3,474                       -            3,739
             Liabilitas sewa/Lease liabilities              11,456              21,036                   33,744                   1,625           67,861
             Utang bank/Bank loans                          85,354             119,242                  754,263                  12,751          971,610
             Senior Notes                                        -              31,875                  781,875                       -          813,750

             Total                                       1,065,691             172,418                 1,573,356                 14,376        2,825,841


          Manajemen berpendapat bahwa tidak ada                                          Management is of the opinion that there is no
          masalah risiko likuiditas signifikan untuk Grup                                significant liquidity risk for the Group since the
          karena Grup memiliki modal kerja yang positif                                  Group has positive working capital and positive
          dan arus kas operasi yang positif.                                             operating cash flows.

      (2) Estimasi nilai wajar                                                  (2) Fair value estimation

          Nilai wajar aset dan liabilitas keuangan                                       The fair value of financial assets and liabilities is
          diestimasi untuk keperluan pengakuan dan                                       estimated for recognition and measurement or
          pengukuran      atau    untuk    keperluan                                     for disclosure purposes.
          pengungkapan.
Page 174
                                      PT ADARO ENERGY INDONESIA Tbk
                                 DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                               Lampiran 5/162 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                                 30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                              (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                       unless otherwise stated)

42.   MANAJEMEN RISIKO KEUANGAN (lanjutan)                     42.   FINANCIAL RISK MANAGEMENT (continued)

      (2) Estimasi nilai wajar (lanjutan)                            (2) Fair value estimation (continued)

          Nilai wajar adalah suatu jumlah dimana suatu                   The fair value is the amount for which an asset
          aset dapat dipertukarkan atau suatu liabilitas                 could be exchanged or a liability settled between
          diselesaikan antara pihak yang memahami dan                    knowledgeable and willing parties in an arm’s
          berkeinginan untuk melakukan transaksi wajar.                  length transaction.

          PSAK No. 68, “Pengukuran nilai wajar”,                         SFAS No. 68, “Fair value measurement”,
          mensyaratkan pengungkapan atas pengukuran                      requires disclosure of fair value measurements
          nilai wajar dengan tingkat hierarki nilai wajar                through the following fair value measurement
          sebagai berikut:                                               hierarchy:

             Harga dikutip (tidak disesuaikan) dalam                        Quoted prices (unadjusted) in active markets
              pasar aktif untuk aset atau liabilitas yang                     for identical assets or liabilities (Level 1);
              identik (Tingkat 1);

             Input selain harga yang dikutip dari pasar                     Inputs other than quoted prices included
              yang termasuk dalam Tingkat 1 yang dapat                        within Level 1 that are observable for the
              diobservasi untuk aset atau liabilitas, baik                    asset or liability, either directly (that is, as
              secara langsung (misalnya harga) atau                           prices) or indirectly (that is, derived from
              secara tidak langsung (misalnya turunan                         prices) (Level 2); and
              dari harga) (Tingkat 2); dan

             Input untuk aset atau liabilitas yang bukan                    Inputs for the asset or liability that are not
              berdasarkan data pasar yang dapat                               based on observable market data (that is,
              diobservasi (informasi yang tidak dapat                         unobservable inputs) (Level 3).
              diobservasi) (Tingkat 3).

          Tabel dibawah ini menggambarkan nilai tercatat                 The table below describes the carrying amount
          dan nilai wajar dari aset/liabilitas keuangan yang             and fair value of the financial assets/liabilities that
          tidak disajikan Grup pada nilai wajarnya:                      are not presented by the Group at fair value:

                                             Nilai tercatat/            Nilai wajar/
                                            Carrying amount             Fair value

          30 September 2023                                                                             30 September 2023
          Piutang lain-lain dari kepentingan                                                    Other receivables from non-
           non-pengendali                                79,100                      70,128              controlling interests
          Pinjaman untuk pihak ketiga                   165,737                     165,486            Loans to third parties
          Pinjaman untuk pihak berelasi                 141,792                     130,633         Loans to related parties
          Senior Notes                                  696,356                     677,642                    Senior Notes

          31 Desember 2022                                                                              31 December 2022
          Piutang lain-lain dari kepentingan                                                    Other receivables from non-
           non-pengendali                                79,100                      68,209              controlling interests
          Pinjaman untuk pihak ketiga                   159,504                     163,384            Loans to third parties
          Pinjaman untuk pihak berelasi                 143,653                     148,786         Loans to related parties
          Senior Notes                                  700,890                     723,750                    Senior Notes

          Utang bank dan pinjaman dari pihak ketiga                      Bank loans and loans from third parties are
          merupakan liabilitas dengan tingkat bunga                      liabilities with floating interest rates. Thus, the
          mengambang, sehingga nilai tercatat setara                     carrying amount of the financial liabilities
          dengan nilai wajar. Nilai wajar Senior Notes                   approximate their fair values. The fair value of
          diestimasi menggunakan harga dikutip dalam                     Senior Notes is estimated using the quoted
          pasar aktif pada tanggal 30 September 2023 dan                 market price as at 30 September 2023 and
          31 Desember 2022. Pengungkapan nilai wajar                     31 December 2022. Fair value disclosure of
          Senior Notes dihitung menggunakan Tingkat 1.                   Senior Notes is calculated using Level 1 input.

          Pada tanggal 30 September 2023 dan                             As at 30 September 2023 and 31 December
          31 Desember 2022, nilai wajar investasi pada                   2022, the fair values of investment in gold and
          emas dan investasi tertentu lainnya diukur                     certain other investments are measured using
          menggunakan Tingkat 1 dari hierarki nilai wajar,               Level 1 of the fair value hierarchy, while financial
          sedangkan aset keuangan pada nilai wajar                       assets at FVOCI and FVTPL are measured using
          melalui penghasilan komprehensif lain dan laba                 Level 3 of the fair value hierarchy.
          rugi diukur menggunakan Tingkat 3 dari hierarki
          nilai wajar.
Page 175
                                     PT ADARO ENERGY INDONESIA Tbk
                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                             Lampiran 5/163 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                   FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                               30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                            (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                     unless otherwise stated)

42.   MANAJEMEN RISIKO KEUANGAN (lanjutan)                   42.   FINANCIAL RISK MANAGEMENT (continued)

      (2) Estimasi nilai wajar (lanjutan)                          (2) Fair value estimation (continued)

          Pinjaman untuk pihak ketiga dan pihak berelasi               Certain loans to third parties and related parties
          tertentu merupakan aset dengan tingkat bunga                 are assets with fixed interest rates and
          tetap dan piutang dari kepentingan non-                      receivables from non-controlling interest are
          pengendali merupakan aset tak berbunga,                      non-interest bearing assets. Thus, the carrying
          sehingga nilai tercatat aset keuangannya tidak               amount of the financial assets does not represent
          menunjukkan nilai wajarnya. Pada tanggal                     their fair value. As at 30 September 2023 and
          30 September 2023 dan 31 Desember 2022, nilai                31 December 2022, the fair value of certain loans
          wajar pinjaman untuk pihak ketiga dan pihak                  to third parties and related parties, and
          berelasi, dan piutang dari kepentingan non-                  receivables from non-controlling interests are
          pengendali dihitung menggunakan Tingkat 3 dari               measured using Level 3 of the fair value
          hierarki nilai wajar.                                        hierarchy.

          Nilai wajar aset keuangan dari konsesi jasa                  The fair value of financial assets of service
          menggunakan arus kas yang didiskontokan                      concession is measured using discounted cash
          berdasarkan tingkat suku bunga terakhir dari                 flows based on the interest rate of the latest
          aset    keuangan     dari  proyek   konsesi.                 financial assets of concession projects. Fair
          Pengungkapan nilai wajar aset keuangan dari                  value disclosure of financial assets from service
          proyek    konsesi   jasa   dihitung  dengan                  concession projects is calculated using Level 3
          menggunakan input Level 3.                                   inputs.

          Nilai tercatat dari pinjaman untuk pihak ketiga              The carrying amounts of the loans to third parties
          berkisar menunjukkan nilai wajarnya karena                   approximate their fair values as they are fixed
          piutang tersebut dikenakan bunga pinjaman                    interest-bearing receivables that were initially
          tetap     dimana     piutang   tersebut   telah              recognised at fair value based on market rates at
          mencerminkan nilai wajar berdasarkan tingkat                 the initial recognition date.
          bunga pasar pada saat tanggal pengakuan awal.

          Nilai tercatat dari aset dan liabilitas keuangan             The carrying amount of other financial assets
          lainnya telah berkisar menunjukkan nilai                     and liabilities approximate their fair values due to
          wajarnya karena memiliki sifat jangka pendek                 the short-term nature of the financial
          dari instrumen keuangannya.                                  instruments.

          Untuk periode sembilan bulan yang berakhir                   For the nine-month period ended 30 September
          pada tanggal 30 September 2023 dan untuk                     2023 and for the year ended 31 December 2022,
          tahun yang berakhir pada tanggal 31 Desember                 there were no transfers between levels.
          2022, tidak terdapat pengalihan antar tingkat.

      (3) Manajemen risiko permodalan                              (3) Capital risk management

          Dalam mengelola permodalannya, Grup                          In managing its capital, the Group safeguards its
          senantiasa mempertahankan kelangsungan                       ability to continue as a going concern and to
          usaha serta memaksimalkan manfaat bagi                       maximise benefits to the shareholders and other
          pemegang saham dan pemangku kepentingan                      stakeholders.
          lainnya.

          Grup secara aktif dan rutin menelaah dan                     The Group actively and regularly reviews and
          mengelola permodalannya untuk memastikan                     manages its capital to ensure the optimal capital
          struktur modal dan pengembalian yang optimal                 structure and return to the shareholders, taking
          bagi      pemegang       saham,      dengan                  into consideration the efficiency of capital use
          mempertimbangkan efisiensi penggunaan modal                  based on operating cash flows and capital
          berdasarkan arus kas operasi dan belanja                     expenditure and also consideration of future
          modal, serta mempertimbangkan kebutuhan                      capital needs.
          modal di masa yang akan datang.

          Grup      juga   berusaha    mempertahankan                  The Group also seeks to maintain a balance
          keseimbangan antara tingkat pinjaman dan                     between its level of borrowing and equity position
          posisi ekuitas untuk memastikan struktur modal               in order to ensure the optimal capital structure
          dan pengembalian yang optimal. Tidak ada                     and return. There were no changes in the
          perubahan pada pendekatan Grup dalam                         Group’s approach to capital management during
          mengelola permodalannya selama periode                       the year.
          berjalan.
Page 176
                                     PT ADARO ENERGY INDONESIA Tbk
                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                             Lampiran 5/164 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                   FINANCIAL STATEMENTS
30 SEPTEMBER 2023 DAN 31 DESEMBER 2022                               30 SEPTEMBER 2023 AND 31 DECEMBER 2022
(Dinyatakan dalam ribuan Dolar AS,                                            (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                     unless otherwise stated)

43.   OTORISASI      LAPORAN                 KEUANGAN        43.   AUTHORISATION           OF    THE    INTERIM
      KONSOLIDASIAN INTERIM                                        CONSOLIDATED         FINANCIAL STATEMENTS

      Laporan keuangan konsolidasian interim ini                   These interim consolidated financial statements were
      diotorisasi untuk diterbitkan sesuai dengan resolusi         authorised for issue in accordance with a resolution
      Direksi Perusahaan tanggal 30 Oktober 2023.                  of the Board of Directors of the Company on
                                                                   30 October 2023.
Page 177

          

File

File Open PDF
Source IDX
Size1.69 MB
Published31 Oct 2023
Pages177
Characters1,148,167
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 0 people and organisations named in the text · linked when the evidence is strong

The name pass has not read this document yet.

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

Other files in this announcement 5

FinancialStatement-2023-III-ADRO.xlsx done
inlineXBRL.zip done
↑↓ select ↵ open ⇧↵ see every result