Skip to content
Back to announcement

Penjelasan Perihal Perubahan Pos 30 Sep 2023.pdf

Financial statement Text extracted DRMA

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 2

Page 1
                              PT DHARMAPOLIMETALTbK
                                            AUTOMOTIVE COMPONENT AND METAI- FINISHING
                                                                                                                                ww
                                                                                                                                Automotive Environment
                                                                                                                                |ATF 16949 tso 14001
                                                                                                                                &   st\1 GtoBAL
                                                                                                                                                  &   SAt G\OB At




             Cikarang, 25 Oktober 2023



             Nomor: 000s/DPlDlR/./CKR/Dl R/X 12A23



             Kepada Yth
             PT Bursa Efek lndonesia
             Gedung Bursa Efek lndonesia
             ilJend Sudirman Kav 52-53
             Jakarta 1297A


             Perihal: Penjelasan atas perubahan beberapa pos pada Laporan Posisi Keuangan Konsolidasian lnterim
             tanggal 30 September 2023.



             Dengan Hormat,

             Sesuai dengan Keputusan Direksi PT Bursa Efek Jakarta No. Kep-3O6/BEllAT-ZAA4,tanggal
              19 Juli 2004, Peraturan Nomor 1-E pasal 111-1.1.4 mengenai perubahan lebih dari 2O% pada pos
             jumlah aset dan atau jumlah liabilitas pada Laporan Posisi Keuangan Konsolidasian lnterim PT Dharma
             Polimetal Tbk {Perusahaan} untuk periode sembilan bulan yang berakhir pada tanggal 30 September
              2A23, berikut kamisampaikan penjelasan beberapa pos yang mengalami kenaikan signifikan
             adalah sebagai berikut:

                                                                                                                          Persentase
                                                                                                                        (enaikan dari
                     Laporan Posisi                                                                                     (Peningkatan
                       Keuangan                   30 September            3l Besember               Kenaikanl             Total aset
                     Konsolidasian                     ?:B7:}                   zg22               lPenurunanl          dan tiabilitasl

               Aset
               Property Plant
               Equipment                       1.451"759"935.893         937.464.756.482         514.?9L.179.4L7            74,94%
               Liabilitas
               Utang Bank Jangka
               Pendek                             135.130-909.378        189.568.160.243        ts3"437.2s0-85s1             -34.9/o
               Utang -usaha -
                  Pihak ketiea                    549-744-745.O94        511.075.959.433         38.L68.776.661               2s%
               Utang Bankjangka
               Paniang                            399.277.S85.381        320.5114.783.98S        78.632.3fi2.392              s7%
               Lia bi litas imbalan keria         118.?ffi.243.162        63.888.231-2C2         54.321.011.960               3s%



                                                                                                                                    vv/
                                                                                                                                     ,\*

plant 1 : Delta Silikon 3., Jl. Angsana Raya Blok A9 No.8 Kawasan lndustri Lippo Cikarang 17550, Bekasi, Jawa Barat, (62211 897 4637 Fax: (6221\ 899 01656
       Plant 2 : Jl. Wadas, Blok Simaja, RT : 023 RW : 001 Ds. Gomban& 1Gc                     Jawa Barat Telp. (0231) 882 0160 / (0231) 882 0170
                                                                             [:[f;;rT.ton,
Page 2
Penjelasan:

    1. PPE Meningkat sebesar Rp 5142 M peningkatan akibat daripada akuisisi entitas anak yang
       mempunyai PPE dengan *ilai wajar sebesar Rp 268,5M. sisanya oleh pembelian dan penjualan
       yang dilakukan di periode berjalan oleh Perusahaan dan Entitas anak.
    2. Utang Bank Jangka Pendek menlrrun Rp 53M dikarenakan terdapat pembayaran kepada Bank
        yang terbesar kepada PT Bank Clill3 ftliaga Tbk, PT Sa*k CentralAsia Tbk.
    3. Utang usaha meningkat sebesar Rp 38,X.M di'rrarenakan ak*isisi entitas anak utang dari entitas
        anak yang diakuisisi adalah sebesar Rp 1*0,5M, pada peri*de Desember belum terkonsolidasi dan
        baru dikonsolidasikan pada lanuari 2023, sisanya atas penarnbahan dan pembayaran yang terjadi
       di setiap bulannya.
    4. Utang Bank Jangka Panjang meningkat Bp 7&6M dikarenakan pada bula* januari Perusahaan
       meminjam laan dariBank CIMB sebesar Rp ZOOM da* ada pembayara* yang dilakukan di periode
       berjalan sebesar Rp 142M. dan penambahan loan 21,1M darientitas anak DCl.
    5. Liabilitas imbalan kerja meningkat sebesar Rp 543M dikarenakan yang terbesar dari penambahan
        Entitas anak baru TCH sebesar Rp 53,3M yang baru diakusisi di Januari 2023, dan sisanya
        penambahan daripada grup atas Imbalan kerja karyawan.




Hormat kami




                                                            wY\               ,,/


lrianto Santoso                                                   Darmawan Widiaia
(Direktur Utarna)                                                 ilirektur

File

File Open PDF
Source IDX
Size1.16 MB
Published25 Oct 2023
Pages2
Characters5,639
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 0 people and organisations named in the text · linked when the evidence is strong

The name pass has not read this document yet.

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

Other files in this announcement 6

FinancialStatement-2023-III-DRMA.xlsx done
inlineXBRL.zip done
↑↓ select ↵ open ⇧↵ see every result