Skip to content
Back to announcement

20231010_MBMA_Laporan Bulanan Aktivitas Eksplorasi_31447705_lamp2.pdf

Other Text extracted MBMA

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 4

Page 1
10th October 2023

    Exploration Report for Period of July – September 2023

PT Merdeka Battery Materials Tbk (IDX: MBMA) (“MBMA” or the “Company”) is pleased to
announce the exploration report for the third quarter (“Q3”) ending on 30 September 2023.

MBMA holds a portfolio of high-quality assets in the battery materials value chain located in
Central Sulawesi and Southeast Sulawesi, Indonesia.

MBMA comprises the following key assets:

   •   Sulawesi Cahaya Mineral Mine (“SCM Mine”)
   •   Rotary Kiln-Electric Furnace Smelters (“RKEF Smelters”)
   •   Nickel Matte Converter (“Nickel Matte”)
   •   Acid Iron Metal Project (“AIM Project”)

In addition to its existing assets, MBMA is also engaged in several noteworthy downstream
growth projects including High Pressure Acid Leach (“HPAL”) processing facilities and the
Indonesia Konawe Industrial Park (“IKIP”), a battery material focused industrial park, in addition
to other assets that support the overall nickel processing chain.

MBMA has an active exploration program focused on delineating additional nickel resources at
the SCM Mine. During Q3, MBMA completed the following exploration activities.

   A. Expenditure:
       Total estimated exploration costs incurred for the SCM Mine is Rp25.3 billion, consisting
       of life of mine resource definition drilling and associated test work.
   B. Area:
       SCM Mine, Konawe, Southeast Sulawesi.
   C. Exploration Party:
       All work was completed by PT Sulawesi Cahaya Mineral.
   D. Assessment Method:
       Drilling from surface (Diamond Drilling), geological mapping, sampling, and geophysical
       survey (Ground Penetration Radar/GPR).
   E. Election of Assessment Area:
       The areas selected for the exploration programs were close to the current pits and
       aligned with future mining plan.




PT Merdeka Battery Materials Tbk                                                       Page 1 of 4
Page 2
   F. Results of Exploration:
       237 drill holes were completed with total of 8,576 metres during Q3 2023 as shown in
       Table 1.
                               Table 1: SCM Mine drilling statistics Q3 2023

         Drill        Area         Drill Holes   Metres
                                                                          Details
         Type       Prospect       Completed     Drilled
                                                             Resource definition/infill drilling -
          DD         BR2&3            237        8,576
                                                            spacing 100 metres and 50 metres
                 Total                237        8,576

   G. Action Plan:
       Diamond drilling program will continue using seven rigs for resource definition/infill and
       exploration drilling.
                           Figure 1: Exploration map of the SCM Mine




PT Merdeka Battery Materials Tbk                                                       Page 2 of 4
Page 3
Investor Relations
PT Merdeka Battery Materials Tbk
Treasury Tower 69th Floor
District 8 SCBD Lot. 28
Jl. Jenderal Sudirman Kav. 52–53
South Jakarta 12190, Indonesia
Email: investor.relations@merdekabattery.com
Website: https://merdekabattery.com/




PT Merdeka Battery Materials Tbk               Page 3 of 4
Page 4
DISCLAIMER
This document: (i) is for information purposes, (ii) may or may not contain certain “forward-looking
statements”, (iii) does not constitute or form part of any offer for sale or subscription of or solicitation or
invitation of any offer to buy or subscribe for, or sell any securities of PT Merdeka Battery Materials Tbk
(“MBMA” or the “Company”) and its subsidiaries (together referred to as “MBMA Group”) or to enter into
any transaction under Indonesia Capital Markets Law or any other prevailing laws in any jurisdiction. All
statements, other than statements of historical fact, which address activities, events, or developments
that MBMA Group believe, expect, or anticipate will or may occur in the future, are forward-looking
statements. Forward-looking statements are often, but not always, identified by the use of words such as
“seek”, “anticipate”, “believe”, “plan”, “estimate”, “targeting”, “expect”, “project”, and “intend” and
statements that an event or result “may”, “will”, “can”, “should”, “could”, or “might” occur or be achieved
and other similar expressions including the negative of those terms or other comparable terminology.
These forward-looking statements, including but not limited to those with respect to permitting and
development timetables, mineral grades, metallurgical recoveries, and potential production, reflect the
current internal projections, expectations, or beliefs of MBMA Group based on information currently
available to MBMA Group. Statements in this document that are forward-looking and involve numerous
risks and uncertainties that could cause actual results to differ materially from expected results are based
on MBMA Group’s current beliefs and assumptions regarding many factors affecting its business
(including affect the outcome and financial effects of the plans and events described herein); statements
in documents are provided to allow potential investors and/or the reader understand MBMA Group
management’s opinions in respect of future. There can be no assurance that (i) MBMA Group have
correctly measured or identified all the factors affecting its business or the extent of their likely impact, (ii)
the publicly available information with respect to these factors on which MBMA Group’s analysis is
complete and/or accurate, and/or correct and/or (iii) MBMA Group’s strategy, which is based in part on
this analysis, will be successful. MBMA Group expressly undertakes no obligation to update and/or revise
any such forward-looking statements if circumstances or MBMA Group management’s estimates or
opinions should change except as required by applicable laws. The reader is cautioned not to place undue
reliance on forward-looking statements and extra cautions on capital market trading.

NO REPRESENTATION, WARRANTY OR LIABILITY
Whilst it is provided in good faith, no representation or warranty is made by MBMA and/or any of its
affiliates, its advisers, consultants, agents, employees, or any of its authorized representatives as to the
accuracy, completeness, currency, or reasonableness of the information in this document and/or provided
in connection with it, including the accuracy or attainability of any forward-looking statements set out in
this document. MBMA Group does not accept any responsibility to inform you and/or update of any matter
arising and/or coming to MBMA Group’s notice after the date of this document which may affect any
matter referred to in this document. Any liability of MBMA Group and/or any of its affiliates, consultants,
agents, employees, or any of its authorized representatives to you or to any other person or entity arising
out of this document pursuant to any applicable law is, to the maximum extent permitted by law, expressly
disclaimed and excluded. This document is not guarantee of future performance, and undue reliance
should not be placed on them as they involve known and unknown risks and uncertainties, which may
cause actual performance and financial results in future periods to differ significantly from any projections
of future performance and/or result expressed and/or implied by such forward-looking document.




PT Merdeka Battery Materials Tbk                                                                     Page 4 of 4

File

File Open PDF
Source IDX
Size0.23 MB
Published10 Oct 2023
Pages4
Characters7,564
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 0 people and organisations named in the text · linked when the evidence is strong

The name pass has not read this document yet.

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result