 Nomor Surat                        311-BEI/IATA-CSL/X/2023

 Nama Perusahaan                    PT MNC Energy Investments Tbk

 Kode Emiten                        IATA

 Lampiran                           0

 Perihal                            Laporan Bulanan Aktivitas Eksplorasi

Perseroan melaporkan aktivitas eksplorasi untuk JUL 2023 Sebagai Berikut :

                                                                                    Hasil aktivitas
      Nama           Area yang
                                  Total biaya yang   Pihak yang       Metode         eksplorasi
   Perusahaan/       dilakukan                                                                      Rencana tindak
                                        telah        melakukan     pengujian dan    hingga akhir
      Anak            aktivitas                                                                         lanjut
                                    dikeluarkan      eksplorasi    pemilihan area      periode
   perusahaan        eksplorasi
                                                                                    pelaporan ini
  PT Putra Muba Pit Abimanyu,  2.584.429.200 PT Putra Muba Touch Coring       04 titik dari    Evaluasi data
      Coal      Pit Pandu dan                     Coal     dan Full Coring rencana 294 titik     data hasil
                  Pit Arjuna                                                 bor, dengan         pemboran
                                                                           total kedalaman periode Januari
                                                                             441,04 meter         sampai
                                                                             dari rencana September 2023
                                                                              kedalaman      dan melakukan
                                                                             39.000 meter       update data-
                                                                                                 data hasil
                                                                                                 eksplorasi
                                                                                             terhadap model
                                                                                             geologi existing
   PT Bhumi       Block Utara  7.796.493.000   PT Bhumi     Touch Coring          22 titik     Evaluasi data
    Sriwijaya     lokasi IUP                    Sriwijaya  dan Full Coring eksplorasi dari       data hasil
  Perdana Coal                               Perdana Coal                    rencana 288         pemboran
                                                                             titik, dengan periode Januari
                                                                           total kedalaman        sampai
                                                                            1.407,06meter September 2023
                                                                                dari total   dan melakukan
                                                                                rencana         update data-
                                                                              kedalaman          data hasil
                                                                             28.800 meter        eksplorasi
                                                                                             terhadap model
                                                                                             geologi existing
  PT Indonesia   Area prospek        0        PT Indonesia  Touch Coring          Belum          Melakukan
   Batu Prima   bagian selatan                 Batu Prima  dan Full Coring    melakukan          pemboran
     Energi    IUP (IBPE South                   Energi                         kegiatan         eksplorasi
                Block) dan Pit                                                 eksplorasi      lanjutan pada
                   Amethys                                                       lanjutan     lokasi rencana
                                                                                             extend Pit Beryl
                                                                                              dan Extend Pit
                                                                                                 Corundum
Page 2
                                                                                        Hasil aktivitas
    Nama             Area yang
                                  Total biaya yang     Pihak yang        Metode          eksplorasi
 Perusahaan/         dilakukan                                                                          Rencana tindak
                                        telah          melakukan      pengujian dan     hingga akhir
    Anak              aktivitas                                                                             lanjut
                                    dikeluarkan        eksplorasi     pemilihan area       periode
 perusahaan          eksplorasi
                                                                                        pelaporan ini
  PT Arthaco       Lokasi sebelah 1.267.808.900        PT Arthaco     Touch Coring      30 titik dari     melanjutkan
 Prima Energy        selatan dan                      Prima Energy   dan Full Coring rencana 137 titik      pemboran
                    sebelah timur                                                        phase 6.      Phase 6 dilokasi
                   dari lokasi IUP                                                                       potensial yang
                                                                                                              berada
                                                                                                            disebelah
                                                                                                           selatan dari
                                                                                                           wilayah IUP
                                                                                                       dengan rencana
                                                                                                           jumlah titik
                                                                                                       sebanyak 30 titik
                                                                                                          dari rencana
                                                                                                         137 titik untuk
                                                                                                       rencana phase 6
                                                                                                          dengan total
                                                                                                           kedalaman
                                                                                                        sebanyak 3.700
                                                                                                        meter dari total
                                                                                                          13.700 meter
 PT Energi Inti       Tidak              0            PT Energi Inti Touch Coring       Belum ada          Melakukan
 Bara Pratama       melakukan                         Bara Pratama dan Full Coring       kegiatan           pemboran
                     kegiatan                                                           pemboran            eksplorasi
                    eksplorasi                                                           lanjutan      sebanyak 28 titik
                                                                                                         bor dan 1.583
                                                                                                           hektar area
                                                                                                             topografi
PT Titan Prawira      Belum              0           PT Titan Prawira Touch Coring      Belum ada          Melakukan
   Sriwijaya        melakukan                           Sriwijaya    dan Full Coring     kegiatan           pemboran
                     kegiatan                                                           pemboran            eksplorasi
                    eksplorasi                                                           lanjutan        sebanyak 101
                                                                                                              titik bor
                                                                                                           termasuk 2
                                                                                                          rencana bor
                                                                                                         geoteknik dan
                                                                                                          1.486 hektar
                                                                                                         area topografi
 PT Primaraya         Tidak              0            PT Primaraya Touch Coring         Belum ada          Melakukan
    Energi          melakukan                             Energi     dan Full Coring     kegiatan           pemboran
                     kegiatan                                                           pemboran            eksplorasi
                    eksplorasi                                                           lanjutan        sebanyak 193
                                                                                                              titik bor
                                                                                                           termasuk 3
                                                                                                          rencana bor
                                                                                                         geoteknik dan
                                                                                                        878 hektar area
                                                                                                             topografi
 PT Sriwijaya         Tidak              0            PT Sriwijaya    Touch Coring      Belum ada          Melakukan
Energi Persada      melakukan                        Energi Persada dan Full Coring      kegiatan           pemboran
                     kegiatan                                                           pemboran            eksplorasi
                    eksplorasi                                                           lanjutan        sebanyak 115
                                                                                                              titik bor
                                                                                                           termasuk 2
                                                                                                          rencana bor
                                                                                                        geoteknik 2.950
                                                                                                           hektar area
                                                                                                             topografi
Page 3
Demikian untuk diketahui.


Hormat Kami,
PT MNC Energy Investments Tbk




Andi Tenri Dala Fajar

Corporate Secretary




PT MNC Energy Investments Tbk
MNC Tower Lantai 22
Telepon : (62-21) 3912935, Fax : (62-21) 3912941, www.mncenergy.com



Nama Pengirim                     Andi Tenri Dala Fajar

Jabatan                           Corporate Secretary
Tanggal dan Waktu                 10-10-2023 15:09




  Dokumen ini merupakan dokumen resmi PT MNC Energy Investments Tbk yang tidak memerlukan tanda tangan
karena dihasilkan secara elektronik oleh sistem pelaporan elektronik. PT MNC Energy Investments Tbk bertanggung
                           jawab penuh atas informasi yang tertera didalam dokumen ini.
Page 4
Go To Indonesian Page

 Letter / Announcement No.         311-BEI/IATA-CSL/X/2023

 Issuer Name                       PT MNC Energy Investments Tbk

 Issuer Code                       IATA

 Attachment                        0

 Subject                           Monthly Exploration Activities Report

The Company reports exploration activities for JUL 2023 as follows :

 Company name/ Exploration             Total cost     Parties     Testing methods    Results of     Follow up plan
   Subsidiary  activities area          incurred    exploration    and selection     exploration
                                                                        area       activities until
                                                                                   the end of the
                                                                                  reporting period

  PT Putra Muba Pit Abimanyu,   2,584,429,200 PT Putra Muba Touch Coring       04 titik dari    Evaluasi data
      Coal      Pit Pandu dan                      Coal     dan Full Coring rencana 294 titik     data hasil
                  Pit Arjuna                                                  bor, dengan         pemboran
                                                                            total kedalaman periode Januari
                                                                              441,04 meter         sampai
                                                                              dari rencana September 2023
                                                                               kedalaman      dan melakukan
                                                                              39.000 meter       update data-
                                                                                                  data hasil
                                                                                                  eksplorasi
                                                                                              terhadap model
                                                                                              geologi existing
    PT Bhumi       Block Utara  7,796,493,000   PT Bhumi     Touch Coring          22 titik     Evaluasi data
     Sriwijaya     lokasi IUP                    Sriwijaya  dan Full Coring eksplorasi dari       data hasil
   Perdana Coal                               Perdana Coal                    rencana 288         pemboran
                                                                              titik, dengan periode Januari
                                                                            total kedalaman        sampai
                                                                             1.407,06meter September 2023
                                                                                 dari total   dan melakukan
                                                                                 rencana         update data-
                                                                               kedalaman          data hasil
                                                                              28.800 meter        eksplorasi
                                                                                              terhadap model
                                                                                              geologi existing
   PT Indonesia   Area prospek        0        PT Indonesia  Touch Coring          Belum          Melakukan
    Batu Prima   bagian selatan                 Batu Prima  dan Full Coring    melakukan          pemboran
      Energi    IUP (IBPE South                   Energi                         kegiatan         eksplorasi
                 Block) dan Pit                                                 eksplorasi      lanjutan pada
                    Amethys                                                       lanjutan     lokasi rencana
                                                                                              extend Pit Beryl
                                                                                               dan Extend Pit
                                                                                                  Corundum
Page 5
Company name/ Exploration           Total cost        Parties     Testing methods    Results of     Follow up plan
  Subsidiary  activities area        incurred       exploration    and selection     exploration
                                                                        area       activities until
                                                                                   the end of the
                                                                                  reporting period

  PT Arthaco       Lokasi sebelah 1,267,808,900     PT Arthaco     Touch Coring      30 titik dari     melanjutkan
 Prima Energy        selatan dan                   Prima Energy   dan Full Coring rencana 137 titik      pemboran
                    sebelah timur                                                     phase 6.      Phase 6 dilokasi
                   dari lokasi IUP                                                                    potensial yang
                                                                                                           berada
                                                                                                         disebelah
                                                                                                        selatan dari
                                                                                                        wilayah IUP
                                                                                                    dengan rencana
                                                                                                        jumlah titik
                                                                                                    sebanyak 30 titik
                                                                                                       dari rencana
                                                                                                      137 titik untuk
                                                                                                    rencana phase 6
                                                                                                       dengan total
                                                                                                        kedalaman
                                                                                                     sebanyak 3.700
                                                                                                     meter dari total
                                                                                                       13.700 meter
 PT Energi Inti       Tidak             0          PT Energi Inti Touch Coring       Belum ada          Melakukan
 Bara Pratama       melakukan                      Bara Pratama dan Full Coring       kegiatan           pemboran
                     kegiatan                                                        pemboran            eksplorasi
                    eksplorasi                                                        lanjutan      sebanyak 28 titik
                                                                                                      bor dan 1.583
                                                                                                        hektar area
                                                                                                          topografi
PT Titan Prawira      Belum             0         PT Titan Prawira Touch Coring      Belum ada          Melakukan
   Sriwijaya        melakukan                        Sriwijaya    dan Full Coring     kegiatan           pemboran
                     kegiatan                                                        pemboran            eksplorasi
                    eksplorasi                                                        lanjutan        sebanyak 101
                                                                                                           titik bor
                                                                                                        termasuk 2
                                                                                                       rencana bor
                                                                                                      geoteknik dan
                                                                                                       1.486 hektar
                                                                                                      area topografi
 PT Primaraya         Tidak             0          PT Primaraya Touch Coring         Belum ada          Melakukan
    Energi          melakukan                          Energi     dan Full Coring     kegiatan           pemboran
                     kegiatan                                                        pemboran            eksplorasi
                    eksplorasi                                                        lanjutan        sebanyak 193
                                                                                                           titik bor
                                                                                                        termasuk 3
                                                                                                       rencana bor
                                                                                                      geoteknik dan
                                                                                                     878 hektar area
                                                                                                          topografi
 PT Sriwijaya         Tidak             0          PT Sriwijaya    Touch Coring      Belum ada          Melakukan
Energi Persada      melakukan                     Energi Persada dan Full Coring      kegiatan           pemboran
                     kegiatan                                                        pemboran            eksplorasi
                    eksplorasi                                                        lanjutan        sebanyak 115
                                                                                                           titik bor
                                                                                                        termasuk 2
                                                                                                       rencana bor
                                                                                                     geoteknik 2.950
                                                                                                        hektar area
                                                                                                          topografi
Page 6
Thus to be informed accordingly.


Respectfully,
PT MNC Energy Investments Tbk




Andi Tenri Dala Fajar

Corporate Secretary




PT MNC Energy Investments Tbk
MNC Tower Lantai 22
Phone : (62-21) 3912935, Fax : (62-21) 3912941, www.mncenergy.com



Sender Name                        Andi Tenri Dala Fajar

Function                           Corporate Secretary

Date and Time                      10-10-2023 15:09




    This is an official document of PT MNC Energy Investments Tbk that does not require a signature as it was
  generated electronically by the electronic reporting system. PT MNC Energy Investments Tbk is fully responsible
                                 for the information contained within this document.

File

File Open PDF
Source IDX
Size0.02 MB
Published10 Oct 2023
Pages6
Characters24,847
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 0 people and organisations named in the text · linked when the evidence is strong

The name pass has not read this document yet.

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result