(SP BRM PT Bumi Resources Minerals Tbk. Bakrie Tower, 6 & 10” Floor Komplek Rasuna Epicentrum Jl. H.R. Rasuna Said, Kuningan Jakarta Selatan 12940 Indonesia T 462 21 5794 5698 F 462 2157945687 www.bumiresourcesminerals.com LAPORAN TENTANG AKTIVITAS EKSPLORASI OLEH ANAK PERUSAHAAN PT BUMI RESOURCES MINERALS TBK. (REPORT ON EXPLORATION ACTIVITIES BY SUBSIDIARIES OF PT BUMI RESOURCES MINERALS TBK.) PT Citra Palu Minerals Nama Perusahaan (Name of Company Tahap Kegiatan KK (Phase of Activity of Contract of Work) Laporan Eksplorasi Periode (Period of Exploration Report PT Citra Palu Minerals (“PT CPM") Operasi Produksi (Production Operation) Juli - September (uly — September) 2023 A. | Daerah Eksplorasi Exploration Areas 1. Blok I, Sulawesi Tengah (Operasi Produksi) 1. Block I, Central Sulawesi (Production Operation) 2. Blok Il, Sulawesi Selatan (Eksplorasi) 2. Block Il, South Sulawesi (Exploration) 3. Blok IV, Sulawesi Tengah (Eksplorasi) 3. Block IV, Central Sulawesi (Exploration) 4. Blok V, Sulawesi Tengah (Eksplorasi) 4. Block V, Central Sulawesi (Exploration) 5. Blok VI, Sulawesi Tengah (Eksplorasi) 5. Block VI, Central Sulawesi (Exploration) B. | Biaya Eksplorasi Exploration Cost 647.535,27 Dollar AS USD647,535.27 C. | Bentuk Kegiatan Eksplorasi Form of Exploration Activities 1. Melanjutkan kegiatan pengeboran sumber daya di Prospek River Reef, Blok I Poboya, dengan total kedalaman sebesar 45.446,4 meter. 2. Melanjutkan kegiatan pengeboran sumber daya di Prospek Watu Putih, Blok | Poboya, dengan total kedalaman sebesar 9.124,25 meter 3. Melanjutkan kegiatan pengeboran eksplorasi di Prospek Hill Reef 2, Blok I Poboya, dengan total kedalaman 2.118,4 meter. 4. Melanjutkan kegiatan pemetaan geologi di area Malomba, Ogowele, dan Anggasan, Blok IV dengan total 131 sampel batuan dan 429 sampel tanah 5. Total sampel pengeboran Prospek River Reef, Blok | Poboya yaitu sebanyak 39.448 sampel dikirimkan ke Laboratorium PT Geoservices untuk dianalisis geokimia (Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Hg dan L Continuing the resources drilling program in River Reef Prospect of Block I Poboya, with total depth of 45,446.4 metres. Continuing the resources drilling program in Watu Putih Prospect of Block 1 Poboya, with a total depth of 9, 124.25 metres. Continuing exoloration drilling in Hill Reef 2 Prospect of Block 1 Poboya, with a total depth 2,118.4 metres. Continuing geological mapping activity at Malomba, Ogowele, and Anggasan Areas, Block IV with a total of collected samples of 131 rock samples and 429 soil samples. Total samples collected from drilling program in River Reef Prospect of Block 1 Poboya were 39448 samples and sent to PT Geoservices Laboratory to conduct geochemical analysis (Au, RA
Page 2 OCR 0.919
(SP BRM kombinasi Au 4 ICP 42 unsur), 212 sampel untuk analisis AAT (Air Asam Tambang), serta dilakukan uji geoteknik terhadap 132 sampel pada Laboratorium Geomekanika dan Peralatan Tambang, Institut Teknologi Bandung (ITB). Selain itu, sebanyak 74 sampel dikumpulkan dan dikomposit menjadi 6 sampel domain untuk pengujian metalurgi di Laboratorium PT Indo Mineral Research Total sampel pengeboran di area Prospek Hill Reef 1, Blok I Poboya yaitu sebanyak 11.652 sampel dikirimkan ke Laboratorium PT Geoservices untuk dianalisis geokimia (Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Hg dan kombinasi Au 4 ICP 42 unsur), 206 sampel untuk analisis AAT (Air Asam Tambang), serta 108 sampel untuk pengujian metalurgi. Selain itu, sebanyak 25 sampel dikumpulkan dan dikirimkan untuk dilakukan pengujian geoteknik pada Laboratorium Geomekanika dan Peralatan Tambang, Institut Teknologi Bandung (ITB). Total sampel pengeboran eksplorasi Prospek Watu Putih, Blok I Poboya sebanyak 6.970 sampel dikirimkan ke Laboratorium PT Geoservices untuk dianalisis geokimia (Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Hg dan kombinasi Au 4 ICP 42 unsur) serta 70 sampel untuk analisis AAT (Air Asam Tambang). Total sampel pengeboran eksplorasi Prospek Hill Reef 2 (Scout Drill), Blok | Poboya sebanyak 2.120 sampel dikirimkan ke Laboratorium PT Geoservices untuk dianalisis geokimia (Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Hg dan kombinasi Au 4 ICP 42 unsur) serta 55 sampel untuk analisis AAT (Air Asam Tambang). Ag, Cu, Pb, Zn, As, Sb, Mo, Hg and combination Of Au # ICPOES 42 elements), 212 samples for ARD (Acid Rock Drainage) Analysis, and also geotechnical test had been done to 132 samples to the Geomechanics and Mining Eguipment Laboratory, Bandung Institute of Technology (TB). Moreover, a total of 74 samples were collected and composited into 6 sample domains for metallurgical test in PT Indo Mineral Research's Laboratory. Total samples collected from drilling program in HIII Reef 1 Prospect, Block 1 Poboya, were 11,652 samples and sent to PT Geoservices Laboratory to conduct geochemical analysis (Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Hg and combination of Au # ICPOES 42 elements), 206 samples for ARD (Acid Rock Drainage) Analysis, and 108 samples for metallurgical test. Moreover, a total of 25 samples were collected for geotechnical testing at the Geomechanics and Mining Eguipment Laboratory, Bandung Institute of Technology (ITB). Total samples collected from exploration drilling program in Watu Putih Prospect of Block 1 Poboya were 6,970 samples and sent to PT Geoservices Laboratory to conduct geochemical analysis (Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Hg and combination of Au # ICPOES 42 elements) also 70 samples for ARD (Acid Rock Drainage) Analysis. Total samples collected from exploration drilling program in Hill Reef 2 Prospect (Scout Drill) of Block | Poboya were 2,120 samples and sent to PT Geoservices Laboratory to conduct geochemical analysis (Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Hg and combination of Au # ICPOES 42 elements) also 55 samples for ARD (Acid Rock Drainage) Analysis. H4.
Page 3 OCR 0.885
(SP BRM Total sampel pengeboran eksplorasi Prospek Barako (Scout Drill), Blok | Poboya sebanyak 221 sampel dikirimkan ke Laboratorium PT Geoservices untuk dianalisis geokimia (Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Hg dan kombinasi Au - ICP 42 unsur) serta 7 sampel untuk analisis AAT (Air Asam Tambang). 9. Total samples collected from exploration drilling program in Barako Prospect (Scout Drill) of Block | Poboya were 221 samples and sent to PT Geoservices Laboratory to conduct geochemical analysis (Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Hg and combination of Au # ICPOES 42 elements) also 7 samples for ARD (Acid Rock Drainage) Analysis. Pihak-Pihak yang Terlibat Involved Parties 1. Laboratorium PT CPM 1. PT CPMS Laboratory 2. PT Sumagud Sapta Sinar 2. PT Sumagud Sapta Sinar 3. Laboratorium PT Geoservices 3. PT Geoservices Laboratory 4. Bureau Varitas — PT IOL Indonesia 4. Bureau Varitas — PT IOL Indonesia 5. PT Pos Indonesia 5. PT Pos Indonesia 6. PT Intertek Utama Service 6. PT Intertek Utama Service 7. Laboratorium Geomekanika dan Peralatan 7. Geomechanics and Mining Eguipment Tambang ITB Laboratory, Bandung Institute of Technology 8. PT Indo Mineral Research 8. PT Indo Mineral Research Metode Pengujian dan Pemilihan Areal Testing Method and Selection Area Ts SO US wN AAS Specific Gravity Fire Assay Agua Regia Digest Hg Analisis ICP OES 42 unsur Natural density, dry density, saturated density, Brazillian test, direct shear, ultrasonic velocity, UCS Analisis Air Asam Tambang Uji Physical Properties (PP), Uji Compressive Strength (UCS), Uji Triaxial Uniaxial Pengujian kominusi (Abrasion Index, BRMI, SMC, JKBMM), Head Grade, Sianidasi, Column Test 1. AAS Specific Gravity Fire Assay Hg Analysis P €: 4, Agua Regia Digest 5 6. ICP OES 42 elements 7 Natural density, dry density, saturated density, Brazillian test, direct shear, ultrasonic velocity, UCS 8. ARD Test Physical — Properties — Test (PP), Uniaxial Compressive Strength (UCS) Test, Triaxial Test 10. Comminution Test (Abrasion Index, BRMI, SMC, JKBMM), Head Grade, Cyanidation, Column Test Kemajuan Eksplorasi Terhadap Kegiatan Triwulan Sebelumnya Exploration Progress towards Guarter's Activities the Preceding 1 Pengeboran sumber daya di Prospek River Reef, Blok I Poboya dilakukan dengan menggunakan 4 rig. Total 220 titik bor, termasuk 3 titik bor hidrogeologi dan 4 titik bor geoteknik, dengan total kedalaman sebesar 45.446,4 meter sampai 1. Resources drilling program in River Reef Prospect of Block | Poboya was conducted using 4 rigs. A total of 220 drill holes, included 3 hydrogeology holes and 4 geotechnical holes, with total depth of 45,446.4 metres has been 8-4
Page 4 OCR 0.924
(SP BRM akhir bulan September 2023. Terdapat penambahan 9 titik bor dengan jumlah kedalaman sebesar 2.372,5 meter dari periode sebelumnya. Pengeboran sumber daya di Prospek Watu Putih, Blok I Poboya dilanjutkan dengan menggunakan 2 rig. Total 25 titik bor dengan total kedalaman sebesar 9.124,25 meter sampai akhir bulan September 2023. Terdapat penambahan 7 titik bor dengan jumlah kedalaman sebesar 2.500,6 meter dari periode sebelumnya Pengeboran eksplorasi di Prospek Hill Reef 2, Blok I Poboya dilanjutkan dengan menggunakan 1 rig. Total 14 titik bor dengan total kedalaman sebesar 2.118,4 meter sampai akhir bulan September 2023. Terdapat penambahan 7 titik bor dengan jumlah kedalaman sebesar 1.052,2 meter dari periode sebelumnya. Penambahan jumlah sampel sebanyak 2.475 sampel hasil pengeboran Prospek River Reef, Blok | Poboya yang dikirim ke Laboratorium PT Geoservices untuk dianalisis geokimia (Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Hg dan kombinasi Au - ICP 42 unsur) dan 8 sampel untuk analisis AAT (Air Asam Tambang). Penambahan jumlah sampel sebanyak 2.752 sampel hasil pengeboran Prospek Watu Putih, Blok I Poboya yang dikirim ke Laboratorium PT Geoservices untuk dianalisis geokimia (Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Hg dan kombinasi Au - ICP 42 unsur dan 16 sampel untuk analisis air asam tambang. Total penambahan sebanyak 78 sampel batuan dan 278 sampel tanah berasal dari kegiatan pemetaan geologi di Area Anggasan dan Malomba, Blok IV. achieved by the end of Seotember 2023. There are additional 9 drill holes with total depth of 2,372.5 metres from the previous period. 2. Resources drilling program in Watu Putih Prospect of Block I Poboya was continued using 2 rigs. A total of 25 drill holes with total depth of 9,124.25 metres has been achieved by the end of September 2023. There are additional 7 drill holes with total depth of 2500.6 metres rom the previous period. 3. Exploration drilling program in Hill Reef 2 Prospect of Block I Poboya was continued using T rig. A total of 7 drill holes with total depth of 21184 metres has been achieved by the end of September 2023. There is additional 7 drill holes with total depth of 1,052.2 metres from previous period, 4, Additional 2,475 drill core samples from River Reef Prospect of Block 1 Poboya's drilling program have been sent to PT Geoservices Laboratory to be analyzed (Au, Ag, u, Pb, Zn, As, Sb, Mo, Hg and combination of Au 4 ICP 42 elements) and 8 samples for ARD (Acid Rock Drainage). 5. Additional 2,752 drill core samples from Watu Putih Prospect of Block 1 Poboya's drilling program have been sent to PT Geoservices Laboratory to be analyzed (Au, Ag, u, Pb, Zn, As, Sb, Mo, Hg and combination of Au # ICP 42 elements) and 16 samples for ARD (Acid Rock Drainage). 6. Total additional of 78 rock samples and 278 soil samples were collected from geological mapping activity at Anggasan dan Malomba Areas, Block IV. Rencana Selanjutnya Next Plan Tt Melanjutkan kegiatan pengeboran di Prospek River Reef, Blok I Poboya dengan tujuan untuk menambah sumber daya di Prospek River Reef. Melanjutkan kegiatan pengeboran di Prospek Watu Putih, Blok I Poboya dengan tujuan untuk 1. Continue resources drilling program in River Reef Prospect of Block I Poboya with objectives to add resources in River Reef Prospect. 2. Continue resources drilling program in Watu Putih Prospect of Block 1 Poboya with the R4
Page 5 OCR 0.908
(SP BRM mendefinisikan sumber daya di Prospek Watu Putih. 3. Melanjutkan kegiatan pengeboran eksplorasi di Prospek Hill Reef 2, Blok | Poboya dengan tujuan untuk mengetahui kemenerusan mineralisasi di bawah permukaan. 4. Melanjutkan pemetaan geologi detail di wilayah Malomba, Ogowele, dan Taanes, Blok IV. Objective of resources definitian in Watu Putih Prospect. 3. Continue exploration drilling program in Hill Reef 2 Prospect of Block 1 Poboya with the obyective of testing the mineralization continuity below the surface. 4. Continue geological detailed mapping at Malomba, Ogowele, and Taanes areas, Block IV. Hambatan Eksplorasi Barriers to Exploration 1. Kegiatan penambangan tanpa izin (PETI) oleh masyarakat sekitar. 2. Pembebasan lahan. 1. Ilegal mining activities by locals. 2. Land acguisition Perizinan/ Persetujuan Baru Yang Diperoleh New Permits/Approvals Acguired R4
Page 6 OCR 0.903
(SP BRM PT Dairi Prima Mineral Nama Perusahaan (Narne of Company) Tahap Kegiatan KK (Phase of Activity of Contract of Work) Laporan Eksplorasi Periode (Period of Exploration Report PT Dairi Prima Mineral (“PT DPM") Operasi Produksi (Production Operation) Juli - September (July - September) 2023 A. | Daerah Eksplorasi Exploration Areas Kegiatan eksplorasi pada Prospek Anjing Hitam | Exploration activities in Anjing Hitam Prospect sudah selesai dilakukan dan saat ini prospek | have already been completed. The prospect tersebut memasuki tahap Operasi Produksi. currently is in Production Operation stage. Selain Prospek Anjing Hitam, di dalam wilayah | Besides Anjing Hitam Prospect, there are some Kontrak Karya PT DPM masih terdapat prospek- | other prospect areas within PT DPM' Contract of prospek lainnya dengan tahap kegiatan yang | Work tenement. The prospects' work progresses berbeda-beda dari eksplorasi regional hingga | are in different stages, ranging from regional pengeboran deliniasi sumberdaya exploration to delineation resource drilling. Salah satu prospek yang paling maju | Lae Jehe Prospect is the most advantageous pengerjaannya adalah Prospek Lae Jehe yang | exo/oration — prospect, which — is located terletak sekitar 200 meter di sebelah barat laut | approximately 200 meters toward northwest from Prospek Anjing Hitam. Prospek ini sudah | Anjing Hitam Prospect. This prospect work stage is memasuki — tahap pengeboran deliniasi | in resource delineation drilling and will be sumberdaya dan masih akan dikembangkan | developed to get final mineral resource value with hingga didapatkan sumber daya mineral | dominant measured and indicated mineral dengan klasifikasi terukur dan tertunjuk yang | resources classification. lebih dominan. B. | Biaya Eksplorasi Exploration Cost 111.511,11 Dollar AS USDT 11, 51111 C. | Bentuk Kegiatan Eksplorasi Form of Exploration Activities 1. Pembaharuan sumber daya dan cadangan. 1. Updating of resources and reserves. 2. Pembaharuan ROD inti bor pada Prospek | 2. Upaating of ROD drill core of Anjing Hitam Anjing Hitam. Prospect. D. | Pihak-Pihak yang Terlibat Involved Parties 1. Tim Internal PT DPM 1. Internal Team of PT DPM 2. Miningplus 2. Miningplus E. | Metode Pengujian dan Pemilihan Areal Testing Method and Selection of Area Pengamatan inti bor Drill core observations
Page 7 OCR 0.907
(PP BRM Kemajuan Eksplorasi Terhadap Kegiatan Triwulan Sebelumnya Exploration Progress relative to Preceding Guarter's Activities Pembaharuan data eksplorasi pada Prospek Anjing Hitam dan Lae Jehe Update of exploration data of Anjing Hitam and Lae Jehe Prospects. Rencana Pengeboran Selanjutnya Next Drilling Plan Hambatan Eksplorasi Barriers to Exploration Perizinan/Persetujuan Baru Yang Diperoleh New Permits/Approvals Acguired
Page 8 OCR 0.881
IN. (SP BRM PT Gorontalo Minerals Nama Perusahaan (Narne of Company Tahap Kegiatan KK (Phase of Activity of Contract of Work) Laporan Eksplorasi Periode (Period of Exploration Report) PT Gorontalo Minerals (“PT GM”) Operasi Produksi (Production Operation) Juli - September (uly — September) 2023 A. | Daerah Eksplorasi Exploration Areas 1. Prospek Sungai Mak, Blok 1 (Tombulilato), | 1. Sungai Mak Prospect, Block 1 (Tombulilato), Gorontalo Gorontalo 2. Prospek Motomboto North, Blok 1/2. Motomboto North Prospect, Block 1 (Tombulilato), Gorontalo (Tombulilato), Gorontalo 3. Prospek Motomboto East, Blok I| 3 Motomboto East Prospect Block 1 (Tombulilato), Gorontalo (Tombulilato), Gorontalo B. | Biaya Eksplorasi Exploration Cost 147.549,70 Dollar AS USD 147,549.70 C. | Bentuk Kegiatan Eksplorasi Form of Exploration Activities 1. Melakukan analisis 19 sampel petrografi dan 18 sampel mineragrafi dari Prospek Motomboto North, Blok I Tombulilato di Laboratorium LAPI-TB 2. Melanjutkan pengeboran eksplorasi di area Prospek — Motomboto East, Blok I Tombulilato dengan kemajuan kedalaman pengeboran sebesar 11.677 meter dari total rencana terbaru sebesar 15.546,75 meter dan telah menyelesaikan 67 lubang bor dari total sebanyak 90 rencana lubang bor. 3. Total sampel pengeboran Prospek Motomboto East, Blok 1 Tombulilato sebanyak 2.283 conto inti bor telah dikirimkan ke Laboratorium PT Geoservices untuk analisis geokimia. 4. Melanjutkan pengujian dan studi air asam tambang sebanyak 29 sampel dari Prospek Motomboto East, Blok I Tombulilato di Laboratorium Teknik Lingkungan ITENAS. 1 Conducting sample analysis of 19 petrography samples and 18 mineragraphy samples from the Motomboto North Prospect of Block 1 Tombulilato in LAPI-ITB's Laboratory. Continuing exploration drilling in Motomboto East Prospect of Block 1 Tombulilato with drilling progress of 11,677 metres from a total newest plan of 15,546.75 metres and already completed 67 drill holes of a total of 90 planned drill holes. A total of 2283 core samples from Motomboto East Prospect of Block 1 Tombulilato have been sent to the PT Geoservices” Laboratory for geochemical analysis. Continuing acid rock drainage analysis and Study for 29 samples from Motomboto East Prospect of Block 1 Tombulilato in the Environmental Engineering Laboratory of ITENAS.
Page 9 OCR 0.875
(SS BRM Conducting testing on 102 rock samples from | 5. Melakukan pengujian sebanyak 102 sampel | 5. batuan dari Prospek Motomboto East, Blok Motomboto East Prospect of Block 1 |) Tombulilato ke Laboratorium Tombulilato, at the Geomechanics Laboratory Geomekanika ITB untuk analisis geoteknik. Of ITB for geotechnical analysis. 6. Melakukan pengujian dan analisis | 6. Conducting metallurgical testing and analysis metalurgi untuk Domain Oxide pada for Oxide Domain at Motomboto Complex Prospek Kompleks Motomboto, Blok I Prospect of Block 1 Tombulilato in PT Tombulilato di Laboratorium PT Geoservices Geoservices” Laboratory under — Metso- di bawah pengawasan Metso-Outotec. Outotec's superuision. 7. Melakukan pengujian dan analisis | 7. Conducting the Phase 4 of metallurgical metalurgi Fase 4 untuk Domain Supergen testing and analysis for Supergene Domain at pada Prospek Sungai Mak, Blok | Sungai Mak Prospect of Block 1 Tombulilato in Tombulilato di Laboratorium PT Geoservices PT Geoservices” Laboratory under Metso- di bawah pengawasan Metso-Outotec. Outotec's supervision. 8. Melakukan pemetaan geologi dan | & Gonducting geological mapping and surface pengambilan sampel batuan permukaan di rock sampling in the Kayubulan, Sungai Mak, Prospek Kayubulan, Sungai Mak, dan and Motomboto Prospects of Block 1 Motomboto, Blok I Tombulilato Tombulilato. 9. Total sampel batuan permukaan sebanyak | 9 4 tota/ of 186 surface rocks sample from the 186 sampel dari Prospek Kayubulan, Sungai Kayubulan, Sungai Mak, and. Motomboto Mak, dan Motomboto, Blok I Tombulilato Prospects of Block 1 Tombulilato have been telah dikirim ke Laboratorium PT sent to PT Geoservices” Laboratory for Geoservices untuk analisis geokimia. geochemical analysis. Pihak-Pihak yang Terlibat Involved Parties 1. PT Sumagud Sapta Sinar 1. PT Sumagud Sapta Sinar 2. PT Darma Henwa 2. PT Darma Henwa 3. Laboratorium PT Geoservices 3. PT Geoservices' Laboratory 4. Laboratorium Geomekanika ITB 4 ITB Geomechanics' Laboratory 5. Laboratorium Teknik Lingkungan ITENAS 5. ITENAS Environmental Technic's Laboratory 6. PT Adiprotek Envirodunia 6. PT Adiprotek Envirodunia 7. PTITS Tekno Sains 7. PTITS Tekno Sains 8. PT LAPIITB 8. PT LAPI ITB 9. Laboratorium Indo Mineral Research 9. Indo Mineral Research 's Laboratory Metode Pengujian dan Pemilihan Areal Testing Method and Selection of Area
Page 10 OCR 0.867
(SP BRM Kemajuan Triwulan Sebelumnya Eksplorasi Terhadap Kegiatan Exploration Progress toward Previous Guarter's Activities 1 Menyelesaikan kegiatan pengeboran pada 1. Completing drilling — activities at the Domain Supergen dari Prospek Motomboto North dan Motomboto East, Blok I Tombulilato di Laboratorium PT Geoservices di bawah pengawasan Metso-Outotec. Prospek Motomboto North, Blok I Motomboto North Prospect of Block 1 Tombulilato. Tombulilato. 2. Kemajuan aktivitas pengeboran di Prospek | 2. The progress of drilling activities In the Motomboto East, Blok 1 Tombulilato Motomboto East Prospect of Block 1 mencakup penambahan 9 lubang bor Tombulilato included the addition of 9 drill dengan total kedalaman sebesar 1.476,6 holes with total depth of 1,476.6 meters. meter. 3. Penambahan jumlah sampel sebanyak | 3. The addition of 2283 samples from 2.283 sampel dari hasil pengeboran pada Motomboto East Prospect of Block 1 Prospek Motomboto East, Blok 1 Tombulilato's drilling program were sent to Tombulilato yang dikirim ke Laboratorium PT Geoservices' Laboratory for analysis. PT Geoservices untuk dianalisis. 4. Menyelesaikan program pengeboran | 4. Completing the hydrogeological drilling hidrogeologi pada Prospek Motomboto program at the Motomboto East Prospect of East, Blok I Tombulilato. Block 1 Tombulilato. 5. Menyelesaikan analisis dan pengujian | 5. Completing metallurgical analysis and testing metalurgi untuk Domain Oxide pada for the Oxide Domain at the Sungai Mak Prospek Sungai Mak, Blok I Tombulilato di Prospect of Block 1 Tombulilato at PT Laboratorium PT Geoservices — dan Geoservices” Laboratory and Inda Mineral Laboratorium Indo Mineral Research. Research's Laboratory. Rencana Selanjutnya Next Plan 1. Melanjutkan pengeboran eksplorasi di | 1. Continuing exploration drilling in Motomboto Prospek Motomboto East, Blok I East Prospect of Block 1 Tombulilato. Tombulilato. 2. Melanjutkan kegiatan pemetaan geologi | 2. Continuing geological mapping activities and dan pengambilan — sampel — batuan surface rock sampling in the Kayubulan permukaan di area Prospek Kayubulan, Prospect, Sungai Mak, and Motomboto Sungai Mak, dan Kompleks Motomboto, Complex of Block I Tombulilato. Blok | Tombulilato. 3. Melakukan Studi Kelayakan untuk Prospek | 3. Conducting Feasibility Study for North Motomboto North, Blok I Tombulilato Motomboto Prospect of Block I Tombulilato. 4. Melakukan pengujian dan analisis metalurgi | 4 Conducting metallurgical testing and analysis for the Supergene Domain of Motomboto North and Motomboto East Prospects in PT Geoservices” Laboratory under Metso- Outotec's supervision.
Page 11 OCR 0.894
(SP BRM 5. Melanjutkan estimasi cadangan mineral pada Prospek Motomboto North, Blok 1 Tombulilato. 5. Continuing mineral reserves estimation of Motomboto North Prospect of Block 1 Tombulilato. Hambatan Eksplorasi Barriers to Exploration 1. Adanya aktivitas Penambangan Tanpa Izin (PETI) di area rencana pengeboran Prospek Motomboto, Blok I Tombulilato 2. Munculnya aktivitas Penambangan Tanpa Izin (PETI) baru di area sepanjang jalur bukaan jalan perintis. 1. An Illegal Mining Activity (PETI) in the drilling planned area of the Motomboto Prospect of Block I Tombulitato. 2. New Illegal Mining Activity (PETI) in the opening area alongside the pioneering road construction. Perizinan/Persetujuan Baru Yang Diperoleh New Permits/Approvals Acguired
Page 12 OCR 0.924
(SP BRM
IV. PT Linge Mineral Resources
Nama Perusahaan
(Name of Company)
Tahap Kegiatan IUP
(Phase of Activity of Mining Permit)
Laporan Eksplorasi Periode
PT Linge Mineral Resources ("PT LMR”)
Eksplorasi (Exploration)
Juli - September (July — September) 2023
(Period of Exoloration Repord
Daerah Eksplorasi
Exploration Areas
1. Prospek Bulan (Proyek Abong)
2. Prospek Bintang 1 (Proyek Abong)
3. Prospek Bintang 2 (Proyek Abong)
1. Bulan Prospect (Abong Project)
2. Bintang 1 Prospect (Abong Project)
3. Bintang 2 Prospect (Abong Project)
Biaya Eksplorasi
Exploration Cost
64.809 Dollar AS
USD64,809
Bentuk Kegiatan Eksplorasi
Form of Exploration Activities
1. Pada periode ini, PT LMR melakukan
kegiatan eksplorasi regional berupa survei
regional geologi.
2. Pada periode ini, PT LMR masih dalam
proses penyelesaian studi AMDAL serta
permohonan Persetujuan Teknis
Penimbunan Limbah Bahan Berbahaya dan
Beracun kepada Kementerian Lingkungan
Hidup dan Kehutanan.
1. During this period, PT LMR carried out
regional exploration activities in the field in
the form of regional geological surveys.
2. During this period, PT LMR was still in the
process of completing an AMDAL study and
in the process of applying for Technical
Approval for the Stockpiling of Hazardous
and Toxic Waste to the Ministry of
Environment and Forestry.
Pihak-Pihak yang Terlibat
Involved Parties
Metode Pengujian dan Pemilihan Areal
Testing Method and Selection of Area
Amdal Scope
Amdal Scope
Kemajuan Eksplorasi
Triwulan Sebelumnya
Terhadap Kegiatan
Exploration Progress toward Previous Guarter's
Activities
Pada periode ini, PT LMR dalam proses
penyelesaian studi AMDAL
During this period, PT LMR was in the process of
finalizing the AMDAL study.
Rencana Selanjutnya
Next Plan
Melanjutkan penyelesaian studi AMDAL sampai
ke tahap Operasi Produksi termasuk penciutan
Izin Usaha Pertambangan Operasi Produksi
berdasarkan data geologi regional
Continue the completion of AMDAL study up to
the Operation Production Phase including
reducing Mining Business License of Operation
Production based on regional geological data.
Page 13 OCR 0.906
(SP BRM Hambatan Eksplorasi Barriers to Exploration 1. Adanya tumpang tindih dengan pihak | 7. There is overlap with the third party (IUP-HHK ketiga (IUP-HHK Tusam Hutan Lestari). Tusam Hutan Lestari). 2. Adanya kegiatan Penambangan Tanpa Izin | 2. There are Illegal Mining (PETI) activities in (PETI) di Prospek Bulan. Bulan Prospect. Perizinan/Persetujuan Baru Yang Diperoleh New Permits/Approvals Acguired
Page 14 OCR 0.885
(PP BRM
V. PT Suma Heksa Sinergi
Nama Perusahaan PT Suma Heksa Sinergi ("PT SHS”)
(Name of Company)
Tahap Kegiatan IUP Operasi Produksi (Production Operation Phase)
(Phase of Activity of Mining Permit)
Laporan Eksplorasi Periode Juli - September Yuly — September) 2023
(Period of Exploration Report)
A. | Daerah Eksplorasi Exploration Areas
1. Prospek Cisadang Central 1. Cisadang Central Prospect
2. Prospek Cisadang West 2. Cisadang West Prospect
3. Prospek Leuwikopo 3. Leuwikopo Prospect
4. Prospek Gunung Batu 4. Gunung Batu Prospect
B. | Biaya Eksplorasi Exploration Cost
2.605.255.817 Rupiah 1DR2, 605, 255,817
C. | Bentuk Kegiatan Eksplorasi Form of Exploration Activities
1. Memulai kegiatan pemetaan geologi di | 7. Starting geological mapping activities in
Prospek Cisadang Central, Cisadang West, Cisadang Central, Cisadang West, Leuwikopo,
Leuwikopo, dan Gunung Batu. and Gunung Batu Prospects.
2. Melanjutkan kegiatan rekonstruksi core| 2. Continuing core drilling — reconstruction
pengeboran. activities.
3. Merencanakan dan mempersiapkan kegiatan | 3. Planning and preparing for drilling activities
pengeboran dengan target total kedalaman with a total drilling depth target of 2,500
pemboran sebesar 2.500 meter di Prospek metres at Cisadang Central Progpect for
Cisadang Central untuk studi metalurgi, metallurgical, geotechnical, and
geoteknik, dan hidrogeologi hydrogeological studies.
4. Melakukan kerjasama dengan konsultan | 4 Collaborating with consultants for JORC
untuk cadangan JORC Reserve.
5. Pengajuan wilayah Pinjam Pakai Kawasan | 5. Submission of Borrow-to-Use of Forest Area
Hutan (“PPKH”) untuk eksplorasi lanjutan (“PPKH") area for further exploration.
D. | Pihak-Pihak yang Terlibat Involved Parties
1. PT Namsuma Luban Abadi
. AMC Consultants Pty. Ltd
PT Como Engineers
CV Anugrah Makmur Sejahtera
CV Banten Centraling
CV Aruntara
ID Un WN
. CV Anugrah Jaya Pabrikasi
1. PT Namsuma Luban Abadi
2. AMC Consultants Pty. Ltd.
PT Como Engineers
CV Anugrah Makmur Sejahtera
CV Banten Centraling
CV Aruntara
Oa r 3
CV Anugrah Jaya Pabrikasi
Page 15 OCR 0.916
(SP BRM E. | Metode Pengujian dan Pemilihan Areal Testing Method and Selection of Area F. | Kemajuan Eksplorasi Triwulan Sebelumnya Terhadap Kegiatan Exploration Progress toward Previous Guarter's Activities 1. Kegiatan rekonstruksi core pengeboran telah diselesaikan sebanyak 88 lubang bor. 2. Penambahan mess, kantor, dan core shed untuk pengeboran metalurgi, — studi geoteknik, dan studi hidrogeologi. 1. Drilling core reconstruction activities have been completed in 88 drill holes. 2. Addition of mess, office, and core shed for metallurgical drilling, geotechnical study, and hydrogeological study. G. | Rencana Selanjutnya Next Plan 1. Melanjutkan pemetaan geologi di Prospek Cisadang — Central, — Cisadang — West, Leuwikopo dan Gunung Batu. 2. Melakukan kegiatan pengeboran di prospek Cisadang Central untuk studi metalurgi, geoteknik, dan hidrogeologi. 3. Melanjutkan rekonstruksi core pengeboran 1. Continuing geological mapping at Cisadang Central, Cisadang West, Leuwikopo, and Gunung Batu Prospects. 2. Conducting drilling activities at Cisadang Central Prospect for metallurgical, geotechnical, and hydrogeological studies. 3. Continuing core drilling reconstruction. H. | Hambatan Eksplorasi Barriers to Exploration 1. Pengajuan perizinan terkait PPKH masih dalam proses pengurusan di Kementerian Lingkungan Hidup dan Kehutanan Republik Indonesia. 2. Keberadaan lokasi IUP PT SHS berada di dekat wilayah pemukiman masyarakat 1. Permit submission related to PPKH is still being processed in the Ministry of Environment and Forestry of Republic of Indonesia. 2. The IUP location of PT SHS is near from the community residential area. |. | Perizinan/Persetujuan Baru Yang Diperoleh New Permits/Approvals Acguired
Names mentioned 0 people and organisations named in the text · linked when the evidence is strong
The name pass has not read this document yet.
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
No extraction attempted yet.