Skip to content
Back to announcement

20230925_KRYA_Laporan Informasi dan Fakta Material_31422965.pdf

Other Text extracted KRYA

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 4

Page 1
Go To English Page

 Nomor Surat                           050/CORSEC/BKPJ/IX/2023

 Nama Perusahaan                       PT Bangun Karya Perkasa Jaya Tbk

 Kode Emiten                           KRYA

 Lampiran                              1
                                       Laporan Informasi atau Fakta Material KRYA Garap Proyek Strategis Nasional
 Perihal
                                       (PSN), Infrastruktur Sandar BMPP Nusantara-1 di Waai Ambon


Dengan ini kami untuk dan atas nama perusahaan menyampaikan Laporan Informasi atau Fakta Material sebagai
berikut:

 Nama Emiten atau Perusahaan Publik            PT Bangun Karya Perkasa Jaya Tbk

 Bidang Usaha                                  Bergerak Dalam Bidang Kontruksi Umum dan Kontruksi Baja

 Telepon                                       (031)7344509

 Faksimili                                     (031)73882177

 Alamat Surat Elektronik (email)               corsec@ptbkpjaya.com


 Tanggal Kejadian                              25 September 2023
 Jenis Informasi atau Fakta Material           KRYA Garap Proyek Strategis Nasional (PSN), Infrastruktur
                                               Sandar BMPP Nusantara-1 di Waai Ambon


 Uraian Informasi atau Fakta Material          PT Bangun Karya Perkasa Jaya Tbk. (KRYA), memperoleh
                                               kepercayaan untuk menggarap salah satu proyek strategi
                                               nasional (PSN) yaitu infrastruktur sandar Barge Mounted
                                               Power Plant (BMPP) Nusantara-1 di Waai Ambon, Maluku.
                                               Proyek dengan nilai Rp 27,809 miliar ini diperoleh PT Bangun
                                               Karya Perkasa Jaya Tbk dari PT PLN Indonesia Power, anak
                                               usaha dari PT PLN (Persero). Proses pekerjaan penyiapan
                                               infrastruktur sandar BMPP Nusantara-1 di Waai Ambon ini
                                               ditargetkan akan berlangsung selama 104 hari, dan
                                               diproyeksikan akan dirampungkan sebelum akhir Desember
                                               2023. Dharmo Budiono Direktur Utama PT Bangun Karya
                                               Perkasa Jaya Tbk. mengatakan, Meskipun kondisi medan
                                               cukup sulit, tapi kami sangat optimistis untuk bisa
                                               menyelesaikan proyek strategis nasional (PSN) ini tepat
                                               waktu, mengingat infrastruktur sandar BMPP ini adalah salah
                                               satu proyek yang sangat penting dan dibutuhkan oleh
                                               masyarakat Ambon, Maluku.
                                               Seperti diketahui sebelumnya PLN telah mengoperasikan
                                               pembangkit terapung BMPP Nusantara-1 yang berkapasitas
                                               60 megawatt (MW) yang diharapkan bakal memperkuat
                                               keandalan pasokan listrik di Ambon, Maluku dan
                                               meningkatkan kemandirian energi di Indonesia Timur.
                                               Dengan tambahan proyek dari PT PLN Indonesia Power,
                                               maka secara keseluruhan PT Bangun Karya Perkasa Jaya
                                               Tbk mencatat proyek yang ditangani sepanjang tahun 2023
                                               sebesar Rp 262,73 miliar. Capaian total proyek itu setara
                                               dengan 105,82% target RKAP perolehan proyek KRYA untuk
                                               sepanjang tahun 2023 yang mencapai Rp 248,28 miliar.
Page 2
Dampak kejadian, informasi atau fakta         Dengan tambahan proyek dari PT PLN Indonesia Power,
material tersebut terhadap kegiatan           maka secara keseluruhan PT Bangun Karya Perkasa Jaya
operasional, hukum, kondisi keuangan,         Tbk mencatat proyek yang ditangani sepanjang tahun 2023
atau kelangsungan usaha Emiten atau           sebesar Rp 262,73 miliar. Capaian total proyek itu setara
Perusahaan Publik                             dengan 105,82% target RKAP perolehan proyek KRYA untuk
                                              sepanjang tahun 2023 yang mencapai Rp 248,28 miliar.

Demikian untuk diketahui.


Hormat Kami,
PT Bangun Karya Perkasa Jaya Tbk




Brigitta Notoatmojo, ST

Direktur




PT Bangun Karya Perkasa Jaya Tbk
Jl. Pattimura Plaza Segi Delapan C 851-852
Telepon : (031)7344509, Fax : (031)73882177, www.ptbkpjaya.com



Nama Pengirim                      Brigitta Notoatmojo, ST

Jabatan                            Direktur
Tanggal dan Waktu                  26-09-2023 07:30

Lampiran                         1. 2023-09-25 KRYA kerjakan BMPP Waai Ambon.pdf


Dokumen ini merupakan dokumen resmi PT Bangun Karya Perkasa Jaya Tbk yang tidak memerlukan tanda tangan
    karena dihasilkan secara elektronik oleh sistem pelaporan elektronik. PT Bangun Karya Perkasa Jaya Tbk
                   bertanggung jawab penuh atas informasi yang tertera didalam dokumen ini.
Page 3
Go To Indonesian Page

 Letter / Announcement No.            050/CORSEC/BKPJ/IX/2023

 Issuer Name                          PT Bangun Karya Perkasa Jaya Tbk

 Issuer Code                          KRYA

 Attachment                           1

 Subject                              Material Information or Facts Report KRYA Working on National Strategic
                                      Project (NSP), BMPP Nusantara-1 Jetty Infrastructure in Waai Ambon

The company hereby announce the Material Information or Facts Report as follows

 Name of Issuer or Public Company             PT Bangun Karya Perkasa Jaya Tbk

 Business Activities                          Bergerak Dalam Bidang Kontruksi Umum dan Kontruksi Baja

 Telephone                                    (031)7344509

 Faximile                                     (031)73882177

 Email Address                                corsec@ptbkpjaya.com


 Date of Event                                25 September 2023

                                              KRYA Working on National Strategic Project (NSP), BMPP
 Type of Material Information or Facts        Nusantara-1 Jetty Infrastructure in Waai Ambon

 Description of Material Information or       PT Bangun Karya Perkasa Jaya Tbk. (KRYA), gained trust to
 Facts                                        work on one of the national strategy projects (NSP), namely
                                              the Nusantara-1 Barge Mounted Power Plant (BMPP) berth
                                              infrastructure in Waai Ambon, Maluku.

                                              This project with a value of IDR 27.809 billion was obtained by
                                              PT Bangun Karya Perkasa Jaya Tbk from PT PLN Indonesia
                                              Power, a subsidiary of PT PLN (Persero).

                                              The work process for preparing the BMPP Nusantara-1 berth
                                              infrastructure in Waai Ambon is targeted to last 104 days, and
                                              is projected to be completed before the end of December
                                              2023.

                                              Dharmo Budiono - President Director of PT Bangun Karya
                                              Perkasa Jaya Tbk. said, "Even though the terrain conditions
                                              are quite difficult, we are very optimistic about being able to
                                              complete this national strategic project (PSN) on time,
                                              considering that the BMPP berth infrastructure is one of the
                                              most important projects and is needed by the people of
                                              Ambon, Maluku."


                                              As previously known, PLN has operated the BMPP Nusantara-
                                              1 floating plant with a capacity of 60 megawatts (MW), which is
                                              expected to strengthen the reliability of electricity supply in
                                              Ambon, Maluku and increase energy independence in Eastern
                                              Indonesia. With the additional project from PT PLN Indonesia
                                              Power, overall PT Bangun Karya Perkasa Jaya Tbk recorded
                                              projects handled throughout 2023 of IDR 262.73 billion. The
                                              total project achievement is equivalent to 105.82% of the
                                              RKAP target for KRYA project acquisition for the entire year
                                              2023 which reached IDR 248.28 billion.
                                              Overall, the project being handled by KRYA in 2023 is IDR
                                              262.73 billion.
Page 4
 Impact of event, material information or       With the additional project from PT PLN Indonesia Power,
 facts towards Issuers or Public                overall PT Bangun Karya Perkasa Jaya Tbk recorded projects
 Company’s operational activities, legal,       handled throughout 2023 of IDR 262.73 billion. The total
 financial condition, or going concern          project achievement is equivalent to 105.82% of the RKAP
                                                target for KRYA project acquisition for the entire year 2023
                                                which reached IDR 248.28 billion.
                                                Overall, the project being handled by KRYA in 2023 is IDR
                                                262.73 billion.


Thus to be informed accordingly.


Respectfully,
PT Bangun Karya Perkasa Jaya Tbk




Brigitta Notoatmojo, ST

Direktur




PT Bangun Karya Perkasa Jaya Tbk
Jl. Pattimura Plaza Segi Delapan C 851-852
Phone : (031)7344509, Fax : (031)73882177, www.ptbkpjaya.com



Sender Name                          Brigitta Notoatmojo, ST

Function                             Direktur

Date and Time                        26-09-2023 07:30

Attachment                          1. 2023-09-25 KRYA kerjakan BMPP Waai Ambon.pdf


   This is an official document of PT Bangun Karya Perkasa Jaya Tbk that does not require a signature as it was
 generated electronically by the electronic reporting system. PT Bangun Karya Perkasa Jaya Tbk is fully responsible
                                  for the information contained within this document.

File

File Open PDF
Source IDX
Size0.01 MB
Published26 Sep 2023
Pages4
Characters11,179
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 0 people and organisations named in the text · linked when the evidence is strong

The name pass has not read this document yet.

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result