Back to announcement
20230914_ANTM_Laporan Informasi dan Fakta Material_31410438_lamp2.pdf
Other Text extracted ANTMSource file signed link, expires in 15 minutes
Extracted text 1
Page 1
ANTAM's East Halmahera Ferronickel Plant Development Project (P3FH)
Enters the First Metal Tapping Stage
Jakarta, September 14, 2023 PT Aneka Tambang Tbk (ANTAM; IDX: ANTM; ASX: ATM), member
of PT Mineral Industri Indonesia (Persero) (MIND ID) - the State-Owned Enterprise Holding of the
Mining Industry, announced that the Company has carried out first metal tapping of the East
Halmahera Ferronickel Plant on September 12, 2023. The first metal tapping process is a part of the
commissioning process for the East Halmahera Ferronickel Plant and a continuation of the Electric
Smelting Furnace (ESF) switch-on stage, which was previously held on July 19, 2023.
ANTAM's Director of Business Development, I Dewa Wirantaya, said:
"The East Halmahera Ferronickel Plant's first metal tapping is the third phase of a
commissioning series, which is targeted to be completed by the end of the third quarter of
2023. During the commissioning process, ANTAM ensures the stability and safety of the plant
operations. The Company is preparing commercial production as the next step.
The East Halmahera Ferronickel Plant, located in East Halmahera, North Maluku, will have a capacity
of 13,500 Ton Nickel in Ferronickel (TNi). After being fully operational, the East Halmahera
Ferronickel Plant will support ferronickel production from the Kolaka Ferronickel Plant in Southeast
Sulawesi, with a capacity of 27,000 TNi. Thus, ANTAM will have an installed ferronickel production
capacity of 40,500 TNi.
###
Names mentioned 0 people and organisations named in the text · linked when the evidence is strong
The name pass has not read this document yet.
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
No extraction attempted yet.