Skip to content
Back to announcement

20230904_ADHI_Laporan Penggunaan Dana Hasil Penawaran Umum_31396147.pdf

Other Text extracted ADHI

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 8

Page 1
Go To English Page

 Nomor Surat                        014-19/2023/007.

 Nama Perusahaan                    PT Adhi Karya (Persero) Tbk.

 Kode Emiten                        ADHI

 Lampiran                           1

 Perihal                            Laporan Penggunaan Dana Hasil Penawaran Umum

Mengoreksi surat kami nomor : 014-19/2023/007 tanggal 17 Juli 2023 perihal Laporan Penggunaan Dana Hasil
Penawaran Umum, dengan ini perseroan menyampaikan hal sebagai berikut:

Dana yang diperoleh dari Penawaran Umum IDR

                                                                         Rencana      Realisasi
                                   Jumlah
                                                 Biaya        Hasil     Penggunaa Penggunaa
                                     Hasil
   Jenis                                      Penawaran Realisasi         n Dana       n Dana     Sisa Dana
                      Tanggal    Penawaran
Penawaran Nama Emisi                            Umum         Bersih      Menurut      Menurut      (satuan
                       Efektif      Umum
  Umum                                       (satuan mata (satuan       Prospektus Prospektus mata uang)
                                   (satuan
                                                 uang)     mata uang)     (satuan      (satuan
                                 mata uang)
                                                                        mata uang) mata uang)
                     14 Oktober 2.665.717.78 14.219.571.9 2.651.498.20 2.651.498.20 694.050.000. 1.957.448.2
Right Issue ADHI-R
                        2022        1.650         69         9.681         9.681         000        09.681

Penempatan Sisa Dana

     Jenis
                     Kode Nama
   Penawaran                                                       Penempatan List
                        Efek
     Umum
                                     Sisa Dana                                                       Hubungan
                                                 Tingkat Bunga/                      Jangka Waktu
                                   (satuan mata                     Penempatan                        dengan
                                                    Bagi Hasil                       Penyimpanan
                                       uang)                                                        Perusahaan
   Right Issue        ADHI-R     1.347.330.586.6
                                                     4,5       %     Bank BNI             1         pihak Tiga
                                         26
                                 665.594.793.48
                                                     3,75      %     Bank BNI             1         pihak Tiga
                                          8
Page 2
Rincian Rencana Penawaran Umum

    Jenis
                Kode Nama
  Penawaran                 Tanggal Efektif                            Rencana List
                   Efek
    Umum
                                                  Hasil
                                                Realisasi                         Jumlah
                                                 Bersih           Uraian       (satuan mata      Persentase
                                              (satuan mata                         uang)
                                                  uang)
                                                              Setoran modal
                                                                kepada PT
                                                            Jogjasolo Marga
                                                              Makmur dalam
                                            1.751.000.000.0       rangka       1.751.000.000.0
                                                                                                  66      %
                                                   00           membiayai             00
                                                              pembangunan
                                                            proyek Tol Solo-
                                                             Yogyakarta-YIA
                                                               Kulon Progo
                                                              Setoran modal
                                                                kepada PT
                                                            Jasamarga Jogja
                                                              Bawen dalam
                                            535.000.000.00        rangka       535.000.000.00
                                                                                                  20      %
                                                   0            membiayai             0
                                                              pembangunan
  Right Issue    ADHI-R     14 Oktober 2022                     Proyek Tol
                                                               Yogyakarta-
                                                                  Bawen
                                                              Setoran modal
                                                                kepada PT
                                                               Karian Water
                                                             Services dalam
                                            253.999.942.40        rangka       253.999.942.40
                                                                                                   9      %
                                                   0            membiayai             0
                                                              pembangunan
                                                              proyek SPAM
                                                             Karian-Serpong
                                                                  (Timur)
                                                              Setoran modal
                                                              kepada PT PT
                                            70.000.000.000                     70.000.000.000      3      %
                                                               Jalintim Adhi
                                                                 Abipraya
                                                              Setoran modal
                                                            untuk investasi di
                                                                  bidang
                                            41.498.267.281                     41.498.267.281      2      %
                                                               pengolahan
                                                            limbah dan jalan
                                                                     tol
Page 3
Rincian Realisasi Penawaran Umum

    Jenis
                   Kode Nama
  Penawaran                     Tanggal Efektif                         Realisasi List
                      Efek
    Umum
                                                      Hasil
                                                    Realisasi                       Jumlah
                                                     Bersih         Uraian       (satuan mata   Persentase
                                                  (satuan mata                       uang)
                                                      uang)
                                                                Setoran modal
                                                                  kepada PT
                                                               Jogjasolo Marga
                                                                Makmur dalam
                                                663.557.000.00      rangka      663.557.000.00 25,030000
                                                                                                         %
                                                       0          membiayai            0       686645508
                                                                pembangunan
                                                               proyek Tol Solo-
                                                                Yogyakarta-YIA
  Right Issue        ADHI-R     14 Oktober 2022                  Kulon Progo
                                                                Setoran modal
                                                                  kepada PT
                                                               Jasamarga Jogja
                                                                 Bawen dalam
                                                                    rangka                     0,1599999
                                                 4.325.000.000                   4.325.000.000           %
                                                                  membiayai                    964237213
                                                                pembangunan
                                                                  Proyek Tol
                                                                 Yogyakarta-
                                                                    Bawen
                                                                Setoran modal
                                                                  kepada PT                    0,9900000
                                                26.168.000.000                  26.168.000.000           %
                                                                 Jalintim Adhi                 095367432
                                                                   Abipraya

 Demikian untuk diketahui.


 Hormat Kami,
 PT Adhi Karya (Persero) Tbk.




 Farid Budiyanto

 Corporate Secretary




 PT Adhi Karya (Persero) Tbk.
 Jalan Raya Pasar Minggu Km. 18 Jakarta 12510
 Telepon : 021-7975312, Fax : 021-7975311, www.adhi.co.id



 Nama Pengirim                     Farid Budiyanto

 Jabatan                           Corporate Secretary
 Tanggal dan Waktu                 04-09-2023 17:30

 Lampiran                          1. Laporan Realisasi Penggunaan Dana PUT II TW 2 2023.pdf
Page 4
Dokumen ini merupakan dokumen resmi PT Adhi Karya (Persero) Tbk. yang tidak memerlukan tanda tangan karena
  dihasilkan secara elektronik oleh sistem pelaporan elektronik. PT Adhi Karya (Persero) Tbk. bertanggung jawab
                              penuh atas informasi yang tertera didalam dokumen ini.
Page 5
Go To Indonesian Page

 Announcement Number                     014-19/2023/007.

 Issuer Name                             PT Adhi Karya (Persero) Tbk.

 Issuer Code                             ADHI

 Attachment                              1

 Subject                                 Laporan Penggunaan Dana Hasil Penawaran Umum

Correction to our previous announcement number : 014-19/2023/007 dated 17 July 2023 with the subject of Laporan
Penggunaan Dana Hasil Penawaran Umum, the company hereby submit the following information :

Fund received form the public offering            IDR


                                         Amount of                                Plan for use Realized
                                          Proceed      Cost of                     of proceed Use of Fund
   Type of                                                              Net                                  Remaining
                 Name of                  from the      Public                   according to according to
    public                  Listing Date                            Realization                               Fund (in
                 Issuance                   Public    Offering (in                     the          the
   offering                                                        (in Currency)                             Currency)
                                         Offering (in Currency)                   Prospectus Prospectus
                                         Currency)                               (in Currency) (in Currency)

                                             2,665,717,78 14,219,571,9 2,651,498,20 2,651,498,20 694,050,000, 1,957,448,2
Right Issue      ADHI-R
                                                 1,650         69         9,681        9,681         000         09,681


Allocation of Remaining Fund


 Type of public Name / Code of
                                                                        List of allocation
    offering      Securities

                                  Remaining Fund Interest/Yield                                                 Relationship with
                                                                           Allocation        Retention Period
                                   (in Currency)      Rate                                                       the company
   Right Issue          ADHI-R    1,347,330,586,6
                                                            4.5     %      Bank BNI                 1              pihak Tiga
                                        26
                                  665,594,793,48
                                                           3.75     %      Bank BNI                 1              pihak Tiga
                                         8
Page 6
Details of Public Offering Plan


 Type of public Name / Code of
                                  Listing date                              List of plans
    offering      Securities



                                                 Net Realization                      Amount (in
                                                                    Description                       Percentage
                                                  (in Currency)                       Currency)


                                                                   Setoran modal
                                                                     kepada PT
                                                                 Jogjasolo Marga
                                                                   Makmur dalam
                                                 1,751,000,000,0       rangka       1,751,000,000,0
                                                                                                       66      %
                                                        00           membiayai             00
                                                                   pembangunan
                                                                 proyek Tol Solo-
                                                                  Yogyakarta-YIA
                                                                    Kulon Progo
                                                                   Setoran modal
                                                                     kepada PT
                                                                 Jasamarga Jogja
                                                                   Bawen dalam
                                                 535,000,000,00        rangka       535,000,000,00
                                                                                                       20      %
                                                        0            membiayai             0
                                                                   pembangunan
  Right Issue         ADHI-R                                         Proyek Tol
                                                                    Yogyakarta-
                                                                       Bawen
                                                                   Setoran modal
                                                                     kepada PT
                                                                    Karian Water
                                                                  Services dalam
                                                 253,999,942,40        rangka       253,999,942,40
                                                                                                        9      %
                                                        0            membiayai             0
                                                                   pembangunan
                                                                   proyek SPAM
                                                                  Karian-Serpong
                                                                       (Timur)
                                                                   Setoran modal
                                                                   kepada PT PT
                                                 70,000,000,000                     70,000,000,000      3      %
                                                                    Jalintim Adhi
                                                                      Abipraya
                                                                   Setoran modal
                                                                 untuk investasi di
                                                                       bidang
                                                 41,498,267,281                     41,498,267,281      2      %
                                                                    pengolahan
                                                                 limbah dan jalan
                                                                          tol
Page 7
Details of Public Offering Realization


 Type of Public Name / Code of
                                     Listing Date                            Realization Plan
    Offering      Securities



                                                      Net Realization                   Amount (in
                                                                        Description                  Percentage
                                                       (in Currency)                    Currency)


                                                                      Setoran modal
                                                                        kepada PT
                                                                     Jogjasolo Marga
                                                                      Makmur dalam
                                                      663,557,000,00      rangka      663,557,000,00 25.0300006
                                                                                                                %
                                                             0          membiayai            0        86645508
                                                                      pembangunan
                                                                     proyek Tol Solo-
                                                                      Yogyakarta-YIA
  Right Issue         ADHI-R                                           Kulon Progo
                                                                      Setoran modal
                                                                        kepada PT
                                                                     Jasamarga Jogja
                                                                       Bawen dalam
                                                                          rangka                     0.15999999
                                                       4,325,000,000                   4,325,000,000            %
                                                                        membiayai                     64237213
                                                                      pembangunan
                                                                        Proyek Tol
                                                                       Yogyakarta-
                                                                          Bawen
                                                                      Setoran modal
                                                                        kepada PT                    0.99000000
                                                      26,168,000,000                  26,168,000,000            %
                                                                       Jalintim Adhi                  95367432
                                                                         Abipraya

Thus to be informed accordingly.


 Respectfully,
 PT Adhi Karya (Persero) Tbk.




 Farid Budiyanto

 Corporate Secretary




 PT Adhi Karya (Persero) Tbk.
 Jalan Raya Pasar Minggu Km. 18 Jakarta 12510
 Phone : 021-7975312, Fax : 021-7975311, www.adhi.co.id



 Sender Name                             Farid Budiyanto

 Function                                Corporate Secretary

 Date and Time                           04-09-2023 17:30
Page 8
Attachment                        1. Laporan Realisasi Penggunaan Dana PUT II TW 2 2023.pdf


 This is an official document of PT Adhi Karya (Persero) Tbk. that does not require a signature as it was generated
     electronically by the electronic reporting system. PT Adhi Karya (Persero) Tbk. is fully responsible for the
                                      information contained within this document.

File

File Open PDF
Source IDX
Size0.02 MB
Published4 Sep 2023
Pages8
Characters21,894
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 0 people and organisations named in the text · linked when the evidence is strong

The name pass has not read this document yet.

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result