Skip to content
Back to announcement

FS TWII WSBP 2023 - Unaudited.pdf

Financial statement Text extracted WSBP

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 150

Page 1
PT WASKITA BETON PRECAST TBK
LAPORAN KEUANGAN INTERIM/
INTERIM FINANCIAL STATEMENTS

30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022 SERTA
UNTUK PERIODE ENAM BULAN YANG BERAKHIR 30 JUNI
2023 DAN 2022 (TIDAK DIAUDIT)/
JUNE 30, 2023, DECEMBER 31, 2022 AND JUNE 30, 2022 AND
FOR THE SIX-MONTH PERIODS ENDED JUNE 30, 2023 AND
2022 (UNAUDITED)
Page 2
PT WASKITA BETON PRECAST Tbk                               PT WASKITA BETON PRECAST Tbk




Daftar Isi                                  Halaman/                          Table of Contents
                                              Page




Surat Pernyataan Direksi                                            Directors’ Statement Letter

Laporan Keuangan Interim –                                      Interim Financial Statements –
30 Juni 2023, 31 Desember 2022 dan                        June 30, 2023 and December 31, 2022
30 Juni 2022 dan untuk periode enam bulan              and June 30, 2022 and for the six-month
yang berakhir 30 Juni 2023 dan 2022                      periods ended June 30, 2023 and 2022
(Tidak Diaudit)                                                                    (Unaudited)

Laporan Posisi Keuangan Interim                1          Interim Statement of Financial Position

Laporan Laba Rugi dan                          2              Interim Statement of Profit or Loss
Penghasilan Komprehensif Lain Interim                         and Other Comprehensive Income

Laporan Perubahan Ekuitas Interim              3          Interim Statement of Changes in Equity

Laporan Arus Kas Interim                       4                Interim Statement of Cash Flows

Catatan Atas Laporan Keuangan Interim          5        Interim Notes to the Financial Statements
Page 3

          
Page 4
                                                                                                              The original financial statements included herein are in
                                                                                                                                            the Indonesian language.

            PT WASKITA BETON PRECAST Tbk                                                                PT WASKITA BETON PRECAST Tbk
           LAPORAN POSISI KEUANGAN INTERIM                                                        INTERIM STATEMENT OF FINANCIAL POSITION
             30 JUNI 2023, 31 DESEMBER 2022                                                            JUNE 30, 2023, DECEMBER 31, 2022
                     DAN 30 JUNI 2022                                                                         AND JUNE 30, 2022

                                                                  30 Juni/               31 Desember/                30 Juni/
                                                                  June 30,               December 31,                June 30,
                                                    Catatan/        2023                     2022                      2022
                                                     Notes           Rp                       Rp                        Rp

  ASET                                                                                                                                                                   ASSETS
  ASET LANCAR                                                                                                                                                 CURRENT ASSETS
    Kas dan Setara Kas                               5, 37         64.594.984.458         238.946.856.294           174.247.058.692                Cash and Cash Equivalents
    Piutang Usaha - Bersih                           6, 37                                                                                           Account Receivables - Net
      Pihak Berelasi                                              752.425.610.883         621.213.457.310           745.822.974.420                           Related Parties
      Pihak Ketiga                                                192.648.797.495         212.052.683.701           205.579.466.328                              Third Parties
    Piutang Lain-lain                                 7,37                                                                                                    Other Receivables
      Pihak Berelasi                                               17.791.338.563          17.050.686.215             5.666.001.800                           Related Parties
      Pihak Ketiga                                                  5.586.223.270           8.038.207.739             3.350.661.482                              Third Parties
    Persediaan                                         8          322.832.186.209         346.193.304.408           688.987.034.645                                  Inventories
    Tagihan Bruto kepada Pelanggan - Bersih          9, 37                                                                              Gross Amount Due from Customers - Net
      Pihak Berelasi                                              305.764.642.434          514.751.692.232           460.732.521.403                          Related Parties
      Pihak Ketiga                                                 37.998.326.405          179.202.595.442           117.133.971.685                             Third Parties
    Pajak Dibayar di Muka                             10           92.405.565.684           78.281.924.160            31.441.803.836                             Prepaid Taxes
    Uang Muka kepada Pihak Ketiga                                               --             181.438.416               205.362.090                 Advances to Third Parties
    Biaya Dibayar di Muka                             11           32.276.301.205           18.179.117.854            20.071.198.049                          Prepaid Expenses
    Aset Diklasifikasi Dimiliki untuk Dijual          12                        --                       --                        --         Assets Classified as Held for Sale
  JUMLAH ASET LANCAR                                            1.824.323.976.606        2.234.091.963.771         2.453.238.054.430                 TOTAL CURRENT ASSETS

  ASET TIDAK LANCAR                                                                                                                                      NON-CURRENT ASSETS
   Aset Tetap - Bersih                                12        3.470.207.742.842        3.680.901.556.393         3.955.311.806.104        Property, Plant, and Equipment - Net
   Aset Hak Guna - Bersih                             13            9.171.681.575           13.658.822.942            17.497.981.319                   Right-of-Use Assets - Net
   Aset Lain-lain - Bersih                            14           52.477.900.131           35.005.608.772            88.847.589.138                           Other Assets - Net
  JUMLAH ASET TIDAK LANCAR                                      3.531.857.324.548        3.729.565.988.107         4.061.657.376.561            TOTAL NON-CURRENT ASSETS

  JUMLAH ASET                                                   5.356.181.301.154        5.963.657.951.878         6.514.895.430.991                              TOTAL ASSETS


  LIABILITAS DAN EKUITAS                                                                                                                               LIABILITIES AND EQUITY
  LIABILITAS JANGKA PENDEK                                                                                                                                CURRENT LIABILITIES
    Utang Bank Jangka Pendek                         15, 37                                                                                             Short-Term Bank Loans
      Pihak Berelasi                                                            --                      --                        --                          Related Parties
      Pihak Ketiga                                                671.127.052.204         671.127.052.204           661.614.800.319                             Third Parties
    Utang Usaha                                      16, 37                                                                                                   Accounts Payable
      Pihak Berelasi                                               47.052.248.468           48.464.689.028           59.715.817.762                           Related Parties
      Pihak Ketiga                                              2.762.530.289.215        3.231.908.324.174        3.126.128.777.065                             Third Parties
    Utang Lain-lain                                  17, 37                                                                                                     Other Payables
      Pihak Berelasi                                               20.260.904.180          17.951.130.090            77.127.711.007                           Related Parties
      Pihak Ketiga                                                  2.081.834.914           1.051.369.710               611.994.295                             Third Parties
    Utang Pajak                                        18          43.110.279.640          45.882.235.407            57.336.602.812                              Taxes Payable
    Beban Akrual                                       19         470.180.113.393         578.761.527.452           472.743.681.126                          Accrued Expenses
    Uang Muka dari Pelanggan                         20, 37                                                                                           Advances from Customers
      Pihak Berelasi                                               40.676.246.251          32.436.064.714            55.905.287.677                           Related Parties
      Pihak Ketiga                                                 37.606.096.241          41.165.844.618            35.130.949.270                             Third Parties
    Liabilitas Jangka Panjang yang Jatuh Tempo                                                                                                              Current Maturity of
      dalam Satu Tahun                                                                                                                                  Long-Term Liabilities
      Utang Obligasi - Bersih                         21        1.850.769.921.111        1.850.769.921.111        1.803.776.736.110                      Bonds Payable - Net
      Liabilitas Sewa                                 22            2.971.809.989            2.971.809.989            5.297.362.269                          Lease Liabilities
  JUMLAH LIABILITAS JANGKA PENDEK                               5.948.366.795.606        6.522.489.968.497         6.355.389.719.711              TOTAL CURRENT LIABILITIES

  LIABILITAS JANGKA PANJANG                                                                                                                          NON-CURRENT LIABILITIES
    Utang Bank Jangka Panjang                        15, 37                                                                                             Long-Term Bank Loans
      Pihak Berelasi                                              877.641.008.816         677.672.349.774           656.859.372.080                            Related Parties
      Pihak Ketiga                                                652.661.900.760         630.603.301.947           619.221.059.482                              Third Parties
    Liabilitas Jangka Panjang - Setelah Dikurangi                                                                                                          Long-Term Liabilities
      Bagian yang Jatuh Tempo dalam Satu Tahun                                                                                                       - Net of Current Maturity
      Utang Obligasi                                  21          220.125.901.465         211.745.939.370           202.395.166.148                            Bonds Payable
      Liabilitas Sewa                                 22            6.982.749.621           6.982.749.773             9.800.227.550                           Lease Liabilities
    Liabilitas Imbalan Kerja                          36           17.372.141.941          17.372.141.941            19.908.742.083                  Employee Benefit Liabilities
  JUMLAH LIABILITAS JANGKA PANJANG                              1.774.783.702.603        1.544.376.482.805         1.508.184.567.343        TOTAL NON-CURRENT LIABILITIES
  JUMLAH LIABILITAS                                             7.723.150.498.209        8.066.866.451.302         7.863.574.287.054                          TOTAL LIABILITIES

  EKUITAS (DEFISIENSI MODAL)                                                                                                                    EQUITY (CAPITAL DEFICIENCY)
  Modal Saham - Nilai Nominal Rp100 per saham                                                                                           Share Capital - Rp100 par Value per Share
    Modal Dasar - 63.266.778.136 lembar saham                                                                                               Authorized - 63,266,778,136 Shares
    Modal Ditempatkan dan disetor Penuh -                                                                                                                Issued and Fully Paid -
    26.361.157.534 Lembar Saham                       23.a      2.636.115.753.400        2.636.115.753.400         2.636.115.753.400                     26,361,157,534 Shares
  Tambahan Modal Disetor                              23.b      3.944.529.408.861        3.944.529.408.861         3.944.529.408.861                      Additional Paid-In Capital
  Saham Diperoleh Kembali                              24       (775.953.722.340)        (775.953.722.340)         (775.953.722.340)                               Treasury Stocks
  Obligasi Wajib Konversi                                                       --                       --                        --              Mandatory Convertible Bond
  Saldo Laba (Defisit)                                                                                                                                  Retained Earnings (Deficit)
    Telah Ditentukan Penggunaannya                    25           272.173.444.924       272.173.444.924             272.173.444.924                              Appropriated
    Belum Ditentukan Penggunaannya                    25       (8.725.998.312.115)   (8.462.237.614.484)         (7.707.707.971.123)                            Unappropriated
  Komponen Ekuitas Lainnya                                         282.164.230.215       282.164.230.215             282.164.230.215                    Other Component of Equity
  JUMLAH EKUITAS (DEFISIENSI MODAL)                            (2.366.969.197.055)   (2.103.208.499.424)         (1.348.678.856.063)     TOTAL EQUITY (CAPITAL DEFICIENCY)

  JUMLAH LIABILITAS DAN EKUITAS                                 5.356.181.301.154        5.963.657.951.878        6.514.895.430.991            TOTAL LIABILITIES AND EQUITY


  *) Disajikan Kembali pada Catatan 45                                                                                                                  *) As restated in Note 45

Catatan terlampir merupakan bagian yang tidak terpisahkan dari                                           The accompanying notes form an integral part of these
laporan keuangan interim secara keseluruhan.                                                                                     Interim financial statements.

                                                                                     1                                                                                    Paraf:
Page 5
                                                                                           The original financial statements included herein are in
                                                                                                                         the Indonesian language.

         PT WASKITA BETON PRECAST Tbk                                                  PT WASKITA BETON PRECAST Tbk
      LAPORAN LABA RUGI DAN PENGHASILAN                                           INTERIM STATEMENT OF PROFIT OR LOSS AND
           KOMPREHENSIF LAIN INTERIM                                                  OTHER COMPREHENSIVE INCOME
    UNTUK PERIODE ENAM BULAN YANG BERAKHIR                                           FOR THE SIX-MONTH PERIODS ENDED
       30 JUNI 2023 DAN 2022 (TIDAK DIAUDIT)                                         JUNE 30, 2023 AND 2022 (UNAUDITED)


                                                                      30 Juni/June 30
                                                Catatan/       2023                     2022
                                                                Rp                       Rp

Pendapatan Usaha                                 26, 37      641.678.386.965       743.788.908.273                                          Revenues
Beban Pokok Pendapatan                             27      (545.041.243.865)     (639.307.401.148)                                  Cost of Revenues

Laba Bruto                                                   96.637.143.100        104.481.507.125                                        Gross Profit

  Beban Penjualan                                 28        (39.823.000.833)       (41.308.306.929)                                Selling Expenses
  Beban Umum dan Administrasi                     29       (332.420.091.092)     (546.903.989.632)            General and Administrative Expenses
  Beban - Non Contributing Plant                  30       (166.348.854.745)     (145.970.025.395)                 Non-Contributing Plant Expenses
  Beban Pajak Penghasilan Final                                (804.841.160)        (8.129.316.242)                      Final Income Tax Expense
  Keuntungan (Kerugian) Selisih Kurs - Bersih                    (85.497.530)           132.299.138          Gain (Loss) on Foreign Exchange - Net
  Pendapatan Bunga                                31           1.340.730.628            659.953.627                                 Interest Income
  Pendapatan Lainnya - Bersih                     32         326.434.217.361     2.344.116.941.108                               Other Income - Net

Laba (Rugi) Sebelum Beban Keuangan                                                                              Profit (Loss) Before Finance Charges
  dan Pajak                                                (115.070.194.271)     1.707.079.062.800                                        and Tax

Beban Keuangan                                    33       (148.690.503.360)     (279.346.229.558)                                   Finance Charges
Laba (Rugi) Sebelum Pajak                                  (263.760.697.631)     1.427.732.833.242                           Profit (Loss) Before Tax

Beban Pajak Penghasilan Kini                      34                        --                     --                           Income Tax Expenses
Biaya Pajak Tangguhan                             34                        --                     --                           Deferred Tax Expense
Laba (Rugi) Bersih Periode Berjalan                        (263.760.697.631)     1.427.732.833.242                    Net Profit (Loss) for the Period

Pendapatan Komprehensif Lain                                                                                            Other Comprehensive Income
Pos-pos yang Tidak Akan                                                                                             Item that Will Not Be Reclassified
  Direklasifikasi ke Laba Rugi                                                                                     Subsequently to Profit or Loss
  Pengukuran Kembali Kewajiban                                                                                                  Remeasurement of
    Imbalan Kerja - Bersih                        36                        --          2.117.375.695            Defined Benefit Obligations - Net
  Surplus Revaluasi                                                                                                Revaluation Surplus of Property,
       Aset Tetap                                                           --                     --                       Plant and Equipment
                                                                            --          2.117.375.695
Jumlah Laba (Rugi) Komprehensif                                                                              Total Comprehensive Income ( Loss) for
  Periode Berjalan                                         (263.760.697.631)     1.429.850.208.937                                   the Period


Laba (Rugi) Per Saham Dasar                       35                  (10,76)                  58,24                Basic Earnings (Loss) Per Share


Laba (Rugi) Per Saham Dilusian                    35                  (10,76)                  58,24               Diluted Earnings (Loss) Per Share




Catatan terlampir merupakan bagian yang tidak terpisahkan dari                           The accompanying notes form an integral part of these
laporan keuangan interim secara keseluruhan.                                                                     Interim financial statements.

                                                                        2                                                                     Paraf:
Page 6
                                                                                                                                                                                                                   The original financial statements included herein are in
                                                                                                                                                                                                                                                 the Indonesian language.

                                       PT WASKITA BETON PRECAST Tbk                                                                                                                    PT WASKITA BETON PRECAST Tbk
                                    LAPORAN PERUBAHAN EKUITAS INTERIM                                                                                                            INTERIM STATEMENT OF CHANGES IN EQUITY
                                   UNTUK PERIODE ENAM BULAN YANG BERAKHIR                                                                                                                 FOR THE SIX-MONTH PERIODS ENDED
                                      30 JUNI 2023 DAN 2022 (TIDAK DIAUDIT)                                                                                                                   JUNE 30, 2023 AND 2022 (UNAUDITED)

                                                                                                                                                      Saldo Laba (Defisit)/
                                                                  Tambahan                                                                        Retained Earnings (Deficit)                Komponen                  Jumlah Ekuitas
                                          Modal Ditempatkan     Modal Disetor/         Saham Diperoleh              Obligasi Wajib             Ditentukan         Belum Ditentukan         Ekuitas Lainnya/          (Defisiensi Modal)/
                                             dan Disetor/         Additional               Kembali/                   Konversi/              Penggunaannya/       Penggunaannya/          Other Component               Total Equity
                                            Share Capital       Paid-In Capital        Treasury Stocks        Mandatory Convertible Bond      Appropriated         Unappropriated             of Equity             (Capital Deficiency)
                                                 Rp                   Rp                     Rp                          Rp                        Rp                      Rp                     Rp                         Rp

Saldo Per 1 Januari 2022                    2.636.115.753.400   3.944.529.408.861       (775.953.722.340)                               --       272.173.444.924    (9.143.832.170.537)      288.438.220.692         (2.778.529.065.000)                Balance as of January 1, 2022
Reklasifikasi Komponen Ekuitas Lainnya                                                                                                                                   6.273.990.477        (6.273.990.477)                          --   Reclassification of Other Equity Components
Saldo per 1 Januari 2022                                                                                                                                                                                                                                 Balances as January 1, 2022
   (Setelah Reklasifikasi)                 2.636.115.753.400    3.944.529.408.861       (775.953.722.340)                               --       272.173.444.924    (9.137.558.180.060)     282.164.230.215          (2.778.529.065.000)                   (After Reclassification)

Obligasi Wajib Konversi                                    --                     --                     --              3.842.084.973.394                     --                    --                       --      3.842.084.973.394                    Mandatory Convertible Bond
Labai Bersih Periode Berjalan                              --                     --                     --                             --                     --    1.427.732.833.242                        --      1.427.732.833.242                         Net Profit for the Period
Penghasilan Komprehensif Lain                                                                                                                                                                                                                             Other Comprehensive Income
   Periode Berjalan                                        --                     --                     --                             --                     --        2.117.375.695                        --           2.117.375.695                              for the Period

Saldo Per 30 Juni 2022                     2.636.115.753.400    3.944.529.408.861       (775.953.722.340)               3.842.084.973.394        272.173.444.924    (7.707.707.971.123)     282.164.230.215           2.493.406.117.331                   Balance as of June 30, 2022
Penyajian kembali                                          --                     --                     --            (3.842.084.973.394)                     --                    --                       --     (3.842.084.973.394)                                   Restatement
Saldo per 30 Juni 2022                                                                                                                                                                                                                                   Balances as January 1, 2022
   (Setelah Reklasifikasi)                 2.636.115.753.400    3.944.529.408.861       (775.953.722.340)                               --       272.173.444.924    (7.707.707.971.123)     282.164.230.215          (1.348.678.856.063)                   (After Reclassification)



Saldo Per 1 Januari 2023                    2.636.115.753.400   3.944.529.408.861       (775.953.722.340)                               --       272.173.444.924    (8.462.237.614.484)      282.164.230.215         (2.103.208.499.424)                Balance as of January 1, 2023

Laba Bersih Periode Berjalan                               --                     --                     --                             --                     --    (263.760.697.631)                        --       (263.760.697.631)                        Net Profit for the Period

Saldo Per 30 Juni 2023                      2.636.115.753.400   3.944.529.408.861       (775.953.722.340)                               --       272.173.444.924    (8.725.998.312.115)      282.164.230.215         (2.366.969.197.055)                  Balance as of June 30, 2023

   *) Disajikan Kembali pada Catatan 45                                                                                                                                                                                                                    *) As restated in Note 45




Catatan terlampir merupakan bagian yang tidak terpisahkan dari                                                                                                                                            The accompanying notes form an integral part of these
laporan keuangan interim secara keseluruhan.                                                                                                                                                                                      Interim financial statements.

                                                                                                                                             3                                                                                                                                 Paraf:
Page 7
                                                                                                  The original financial statements included herein are in
                                                                                                                                the Indonesian language.

         PT WASKITA BETON PRECAST Tbk                                                      PT WASKITA BETON PRECAST Tbk
           LAPORAN ARUS KAS INTERIM                                                    INTERIM STATEMENT OF CASH FLOWS
    UNTUK PERIODE ENAM BULAN YANG BERAKHIR                                                FOR THE SIX-MONTH PERIODS ENDED
       30 JUNI 2023 DAN 2022 (TIDAK DIAUDIT)                                              JUNE 30, 2023 AND 2022 (UNAUDITED)

                                                                       30 Juni/June 30 ,
                                                Catatan/        2023                       2022
                                                 Notes           Rp                         Rp

ARUS KAS DARI                                                                                                                           CASH FLOWS FROM
 AKTIVITAS OPERASI                                                                                                                OPERATING ACTIVITIES
 Penerimaan dari Pelanggan                                  866.447.853.176         826.554.042.628                               Receipts from Customers
 Pembayaran kepada Pemasok dan Pihak Ketiga                (817.285.498.809)       (621.175.645.905)                 Payments to Suppliers and Third Parties
 Pembayaran kepada Karyawan dan Direksi                    (162.331.408.177)       (110.907.041.636)                  Payments to Employees and Directors
  Kas Dihasilkan dari Operasi                              (113.169.053.809)           94.471.355.087                      Cash Generated from Operations
  Pembayaran Beban Pinjaman                                 (43.149.475.906)          (2.154.224.222)                        Payments of Finance Charges
  Penerimaan Jasa Giro dan Deposito Berjangka                  1.340.730.628             659.953.627                            Receipts of Interest Income
  Pembayaran Pajak                                           (16.676.257.079)        (10.499.967.663)                                    Payment of Taxes

  Kas Bersih Digunakan Untuk                                                                                                            Net Cash Used In
    Aktivitas Operasi                                      (171.654.056.166)          82.477.116.829                                Operating Activities

ARUS KAS DARI                                                                                                                              CASH FLOWS FROM
 AKTIVITAS INVESTASI                                                                                                                   INVESTING ACTIVITY
 Perolehan Aset Tetap                             12           (404.000.000)                           --        Acquisition of Property, Plant and Equipment
 Kas Bersih Digunakan Untuk                                                                                                                 Net Cash Used In
   Aktivitas Investasi                                         (404.000.000)                           --                                 Investing Activity

ARUS KAS DARI                                                                                                                          CASH FLOWS FROM
 AKTIVITAS PENDANAAN                                                                                                             FINANCING ACTIVITIES
 Pembayaran liabilitas sewa                                  (2.208.318.140)          (2.020.454.846)                           Payment of lease liabilities
 Pembayaran Pinjaman Jangka Pendek                15                      --                       --                        Payments of Short-Term Loans
 Kas Bersih Digunakan Untuk                                                                                                             Net Cash Used in
   Aktivitas Pendanaan                                       (2.208.318.140)          (2.020.454.846)                              Financing Activities

KENAIKAN (PENURUNAN) BERSIH                                                                                                NET INCREASE (DECREASE) IN
 KAS DAN SETARA KAS                                        (174.266.374.306)         80.456.661.983                      CASH AND CASH EQUIVALENTS

KEUNTUNGAN SELISIH KURS                                                                                                             UNREALIZED GAIN ON
 YANG BELUM DIREALISASIKAN                                      (85.497.530)               126.492.833                        FOREIGN EXCHANGE RATE

KAS DAN SETARA KAS PADA                                                                                                 CASH AND CASH EQUIVALENTS AT
 AWAL TAHUN                                        5        238.946.856.294          93.663.903.876                               BEGINNING OF YEAR

KAS DAN SETARA KAS PADA                                                                                                 CASH AND CASH EQUIVALENTS AT
 AKHIR PERIODE                                     5         64.594.984.458         174.247.058.692                                  END OF PERIOD




Catatan terlampir merupakan bagian yang tidak terpisahkan dari                                The accompanying notes form an integral part of these
laporan keuangan interim secara keseluruhan                                                                           interim financial statements

                                                                           4                                                                          Paraf:
Page 8
                                                                                  The original financial statements included herein are in
                                                                                                                the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                     PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                              NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                    JUNE 30, 2023, DECEMBER 31, 2022 AND JUNE 30,
      SERTA UNTUK PERIODE ENAM BULAN                                  2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                   ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                   (UNAUDITED)

1.   UMUM                                                         1.   GENERAL

     a.   Pendirian dan Informasi Umum                                 a.   Establishment and General Information

          PT Waskita Beton Precast Tbk (Perusahaan)                         PT Waskita Beton Precast Tbk (the “Company”)
          didirikan berdasarkan Akta No. 10 tanggal                         was established based on notarial deed No. 10
          7 Oktober 2014 dari Fathiah Helmi, S.H., notaris                  dated October 7, 2014 by Fathiah Helmi, S.H.,
          publik di Jakarta dan telah mendapat                              public notary in Jakarta, and has been approved
          pengesahan dari Menteri Hukum dan Hak Asasi                       by the Minister of Law and Human Rights of the
          Manusia Republik Indonesia melalui surat                          Republic of Indonesia through his decision
          keputusan No. AHU-29347.40.10.2014 tanggal                        letter   No.     AHU-29347.40.10.2014     dated
          14 Oktober 2014 serta diumumkan dalam Berita                      October 14, 2014 and was published in the State
          Negara Republik Indonesia No. 60221                               Gazette of the Republic of Indonesia No. 60221
          Tambahan No. 103 tanggal 26 Desember 2014.                        Supplement No. 103 dated December 26, 2014.

          Anggaran Dasar Perusahaan telah beberapa kali                     The Company’s Articles of Association had been
          mengalami perubahan, terakhir berdasarkan                         amended several times, most recently based on
          Akta Pernyataan keputusan Rapat Umum                              the    Extraordinary   General     Meeting     of
          Pemegang Saham Luar Biasa No. 45 tanggal                          Shareholders’ Deed of Decision No. 45 dated
          20 Desember 2022 dari Ashoya Ratam S.H.,                          December 20, 2022 by Ashoya Ratam S.H.,
          M.Kn. Akta ini telah mendapat pengesahan                          M.Kn. This deed has been approved by the
          dari Kementerian Hukum dan Hak Asasi                              Minister of Law and Human Rights of the
          Manusia     Republik     Indonesia   dengan                       Republic of Indonesia based on Decree
          surat No. AHU-AH.01.09-0090639 tanggal                            No.        AHU-AH.01.09-0090639            dated
          20 Desember 2022. Amendemen tersebut terkait                      December 20, 2022. The amendments include,
          atas persetujuan Perubahan Anggaran Dasar                         among others, the approval of Amendments to
          Perusahaan untuk menyesuaikan dengan                              the Company's Articles of Association to conform
          Peraturan Otoritas Jasa Keuangan (POJK).                          to the Financial Services Authority Regulations
                                                                            (POJK).

     b.   Bidang Usaha                                                 b. The Scope of Business

          Sesuai dengan Pasal 3 Anggaran Dasar                              In accordance with Article 3 of the Company’s
          Perusahaan, ruang lingkup kegiatan Perusahaan                     Article of Association, the scope of the
          terutama meliputi industri pabrikasi yaitu                        Company’s activities is mainly within the
          pekerjaan pelaksanaan konstruksi; pekerjaan                       manufacturing industry namely construction
          mekanikal elektrikal termasuk jaringan dan                        work; mechanical electrical work including
          instalasi; radio, telekomunikasi dan instrumen                    network        and        installation;     radio,
          termasuk jaringan dan instalasi; perbaikan/                       telecommunications and instruments including
          pemeliharaan/ renovasi bangunan; perdagangan                      network and installation; repair/ maintenance/
          umum, terutama perdagangan beton precast;                         renovation of buildings; general trading,
          jasa pertambangan; pekerjaan terintegrasi                         especially trading in precast concrete; mining
          (EPC); rancang bangun; building management;                       services; integrated work (EPC); design; building
          pabrikasi bahan dan komponen bangunan;                            management; fabrication of building materials
          pabrikasi komponen peralatan konstruksi;                          and components; fabrication of construction
          penyewaan peralatan konstruksi; layanan jasa                      equipment components; construction equipment
          keagenan bahan dan komponen bangunan serta                        rental; agency services for building materials and
          peralatan     konstruksi;   investasi    dan/atau                 components and construction equipment;
          pengelolaan usaha; ekspor impor; system                           investment and/ or business management;
          development;         pengelolaan        kawasan;                  export/ import; system development; area
          pengembangan; jasa transportasi/ angkutan.                        management; development; transportation/
          Selain kegiatan utama yang disebut diatas juga                    transportation services. In addition to the main
          ada kegiatan penunjang seperti layanan jasa                       activities mentioned above there are also
          konsultasi (konsultan) manajemen; agro industri;                  supporting activities such as consulting services
          layanan jasa bidang teknologi informasi dan                       (consultant) management; agro industry;
          kepariwisataan;      menjalankan      pengelolaan                 information and tourism technology services;
          limbah bahan berbahaya beracun.                                   implementation of hazardous and toxic waste
                                                                            management.




                                                              5
Page 9
                                                                                                                         The original financial statements included herein are in
                                                                                                                                                       the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                                                    PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                                                            NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                                                  JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                                               30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                                                  ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                                                 (UNAUDITED)

        Perusahaan pada mulanya merupakan Divisi                                                               The Company initially operated as a Precast
        Precast dari PT Waskita Karya (Persero) Tbk                                                            Division of PT Waskita Karya (Persero) Tbk
        (WSKT) yang mulai beroperasi secara komersial                                                          (WSKT), which started its commercial operations
        pada akhir tahun 2013. Pada tahun 2014, setelah                                                        at the end of 2013. In 2014, after its spin-off, the
        pemisahan, Perusahaan resmi beroperasi                                                                 Company started its commercial operations as
        sebagai PT Waskita Beton Precast.                                                                      PT Waskita Beton Precast.

        Perusahaan berdomisili di Jakarta dengan kantor                                                        The Company is domiciled in Jakarta with its
        pusat berlokasi di Gedung Teraskita Lantai 3 dan                                                       head office located at Teraskita Building 3rd and
        3A Jl. MT Haryono Kav. 10A, Jakarta Timur                                                              3rdA Floors, Jl. MT Haryono Kav. 10A, East
        13340.                                                                                                 Jakarta 13340.

   c.   Organisasi                                                                                      c. Organization

        Berdasarkan          Keputusan            Direksi                                                      Based on the Decree of the Board of
        No.      54.1/SK/WBP/PEN/2023            tanggal                                                       Directors No. 54.1/SK/WBP/PEN/2023 dated
        21 Maret 2023 tentang revisi perubahan struktur                                                        March 21, 2023, the revisions in the
        organisasi corporate office dan business units di                                                      organizational structure of corporate office during
        Lingkungan Perusahaan selama 2023 adalah                                                               2023 are as follows:
        sebagai berikut:
                           Unit Kerja/ Work Unit                                                             Bagian/ Section                                      Kedudukan/ Location
        Sekretariat Perusahaan/ Corporate Secretary                  Sekretariat dan Departemen Umum/ Secretariat & General Affairs Department                          Jakarta
                                                                     Departemen Komunikasi Perusahaan/ Corporate Communication Department                               Jakarta
                                                                     Departemen Hubungan Investor/ Investor Relations Department                                        Jakarta
                                                                     Departemen Hubungan Kelembagaan Pengembangan Masyarakat/
                                                                     Community Development Institutional Relations Department                                           Jakarta

        Divisi Internal Audit/ Internal Audit Division               Auditor                                                                                            Jakarta

        Divisi Keuangan Perusahaan/ Corporate Finance Division       Departemen Piutang & Utang Usaha/ Accounts Receivable & Accounts Payable Department                Jakarta
                                                                     Departemen Treasury & Aset Manajemen/ Treasury & Asset Management Department                       Jakarta
                                                                     Departemen Perencanaan Keuangan & Pendanaan/ Financial Planning & Fund Department                  Jakarta

        Divisi Akuntansi/ Accounting Division                        Departemen Akuntansi/ Accounting Department                                                        Jakarta
                                                                     Departemen Pajak/ Tax Department                                                                   Jakarta

        Divisi Manajemen Risiko & Kontrol/                           Departemen Manajemen Risiko/ Risk Management Department                                            Jakarta
        Risk Management & Control Division                           Departemen Pengendalian Anggaran Perusahaan/ Corporate Budgeting Department                        Jakarta
                                                                     Departemen Pengendalian Pendapatan & Beban/ Revenue & Cost Control Department                      Jakarta
                                                                     Departemen Administrasi Kontrak/Contract Administration Dept                                       Jakarta

        Divisi Transformasi Perusahaan/                              Departemen Transformasi Keuangan/ Financial Transformation Department                              Jakarta
        Corporate Transformation Division                            Departemen Transformasi Operasional/ Operational Transformation Department                         Jakarta

        Divisi Human Capital (HC) Management /                       Departemen Pengembangan HC/ HC Development Department                                              Jakarta
        Human Capital (HC) Management Division                       Departemen Layanan & Penggajian HC/ HC Service & Payroll Department                                Jakarta
                                                                     Departemen Kinerja, Penghargaan, & Budaya HC/ HC Performance, Reward, & Culture Department         Jakarta

        Divisi Hukum/ Legal Division                                 Departemen Hukum Perjanjian/ Legal Contract Department                                             Jakarta
                                                                     Departemen Advokasi & Litigasi Hukum/ Advocacy & Litigation Department                             Jakarta

        Divisi Sistem & Teknologi Informasi (TI)/                    Departemen Pengembangan Sistem Perusahaan/ Corporate Management System Department                  Jakarta
        System & Information Technology (IT) Division                Departemen Solusi Bisnis TI/ IT Business Solutions Department                                      Jakarta
                                                                     Departemen Infrastruktur dan Operasi TI/ IT Infrastructure & Operations Department                 Jakarta

        Divsi Engineering/                                           Departemen Enginering & Building Information Modeling/
        Engineering Division                                         Engineering & Building Information Modeling Department                                             Jakarta
                                                                     Departemen Riset & Standardisasi Produk/ Product Research & Standardization Department             Jakarta
                                                                     Departemen Operasi Ramping/ Lean Operations Department                                             Jakarta

        Divisi Pengembangan Strategi/                                Departemen Pengembangan Bisnis/ Business Development Department                                    Jakarta
        Strategic Development Division                               Departemen Pemasaran Strategis/ Strategic Marketing Department                                     Jakarta

        Divisi Supply Chain Management (SCM) /                       Departemen Supply Chain Planning, Administration/ SCM Planning, Administration Department          Jakarta
        Supply Chain Management (SCM) Division                       Departemen Purchasing & Commercial 1/ Purchasing & Commercial 1 Department                         Jakarta
                                                                     Departemen Purchasing & Commercial 2/ Purchasing & Commercial 2 Department                         Jakarta

        Divisi Quality ,Health, Safety, Environment System (QHSE)/   Departemen Quality Assurance/ Quality Assurance Department                                         Jakarta
        QHSE Division                                                Departemen HSE/ HSE Department                                                                     Jakarta
                                                                     QHSE Representative/ QHSE Representative Department                                                Jakarta

        Divisi Penjualan/ Sales Division                             Departemen Perencanaan Penjualan, Pengendalian & Manajemen Risiko/
                                                                     Sales Planning, Control & Risk Management Department                                               Jakarta
                                                                     Departemen Administrasi Kontrak Penjualan & Keterlibatan Pelanggan/
                                                                     Sales Contract Administration & Customer Engagement Department                                     Jakarta
                                                                     Departemen Keuangan & Akuntansi/ Finance & Accounting Department                                   Jakarta


                                                                                        6
Page 10
                                                                                                                         The original financial statements included herein are in
                                                                                                                                                       the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                                                    PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                                                            NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                                                  JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                                               30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                                                  ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                                                 (UNAUDITED)

                            Unit Kerja/Work Unit                                                             Bagian/Section                                        Kedudukan/Location
       Divisi Konstruksi & Instalasi/                               Departemen Pengendalian Proyek, Inovasi & Manajemen Risiko/
       Construction & Installation Division                         Project Control, Innovation & Risk Management Department                                             Jakarta
                                                                    Departemen Survei Kualitas/ Quality Survey Department                                                Jakarta
                                                                    Departemen Penjualan Proyek & Administrasi Tender/
                                                                    Project Marketing & Tender Administration Department                                                 Jakarta
                                                                    Departemen Keuangan & Akuntansi/Finance & Accounting Department                                      Jakarta

       Divisi Precast & Post Tension / Precast & Post Tension DivisionDepartemen Production Planning and Inventory Control & Manajemen Risiko/
                                                                      Production Planning and Inventory Control & Risk Management Department                             Jakarta
                                                                      Departemen Produksi & Inovasi/ Production & Innovation Department                                  Jakarta
                                                                      Departemen Keuangan & Akuntansi/ Finance & Accounting Department                                   Jakarta

       Divisi Readymix & Quarry / Readymix & Quarry Division        Departemen Production Planning and Inventory Control & Manajemen Risiko/
                                                                    Production Planning and Inventory Control & Risk Management Department                               Jakarta
                                                                    Departemen Produksi & Inovasi/ Production & Innovation Department                                    Jakarta
                                                                    Departemen Keuangan & Akuntansi/ Finance & Accounting Department                                     Jakarta

       Divisi Peralatan/ Equipment Division                         Departemen Production Planning and Inventory Control & Manajemen Risiko/
                                                                    Production Planning and Inventory Control & Risk Management Department                               Jakarta
                                                                    Departemen Manajemen Peralatan/ Equipment Management Department                                      Jakarta
                                                                    Departemen Keuangan & Akuntansi/ Finance & Accounting Department                                     Jakarta


       Saat ini Perusahaan mempunyai beberapa                                                                  Currently, the Company has several plants and
       pabrik dan kantor proyek antara lain:                                                                   project offices, among others:
       No.                          Unit Bisnis/ Business Unit                       Produk/ Product                                          Alamat/ Address
        1       Plant Cibitung                                                   Precast                            Jl. Imam Bonjol No. 52, Desa Kalijaya, Cikarang Bekasi
        2       Plant Sadang                                                     Precast                            Kampung Mekarsari, RT.005 RW. 02, Desa Cibatu, Kecamatan
                                                                                                                    Cibatu, Purwakarta, Jawa Barat
        3       Plant Karawang                                                   Precast/Batching Plant             Jl. Kosambi Curug KM 7 Dusun Krajan 2 Desa Curug Kecamatan
                                                                                                                    Klari Kabupaten Karawang, Jabar
        4       Plant Sidoarjo                                                   Precast/Batching Plant             Jalan Soenandar Priyo Sudarmo KM.36, Kedungwonokerto,
                                                                                                                    Prambon, Tanggungan Barat, Kabupaten Sidoarjo, Jawa Timur
                                                                                                                    61264, Indonesia
        5       Plant Kalijati PCI                                               Precast/Batching Plant             Jl. Sadang Subang KM 127, RT.04 RW.01, Desa Lengkong,
                                                                                                                    Kecamatan Cipeundeuy, Subang - Jabar
        6       Plant Kalijati II                                                Precast                            Jl. Kaliangsana, Kalijati, Kabupaten Subang, Jawa Barat 41271,
                                                                                                                    Indonesia
        7       Plant Bojonegara                                                                                    Jl. Raya Bojonegara - Salira, Kp. Solor Lor RT/RW 018/008, Ds.
                                                                                 Precast
                                                                                                                    Margagiri, Kec. Bojonegara, Kab. Serang Banten
        8       Plant Gasing Palembang                                           Precast                            Kenten Laut, Talang Klp., Kabupaten Banyu Asin, Sumatera Selatan
                                                                                                                    30961, Indonesia
        9       Plant Klaten                                                     Precast                            Karang Kulon, Dlimas, Ceper, Kabupaten Klaten, Jawa Tengah
                                                                                                                    57465, Indonesia
        10      BP Tebing Tinggi                                                 Batching Plant                     Jl. Siantar Medan km 11 Kel. Purbasari Kec. Tapian Dolok Kodepos
                                                                                                                    21154 Kab. Simalungun
        11      BP INKIS                                                         Batching Plant                     Petatal, Talawi, Batu Bara Regency, North Sumatra
        12      BP LRT Palembang                                                 Batching Plant                     Jalan Gubernur h. Ahmad bastari, kec. Seberang ulu I, kota
                                                                                                                    Palembang
        13      BP Prabumulih Muaraenim                                          Batching Plant                     Desa Sugih Waras Induk Kecamatan Rambang Kapak Tengah
                                                                                                                    Kabupaten Muara Enim, Provinsi Sumatra Selatan
        14      BP KAPB (STA 60)                                                 Batching Plant                     Desa Talang Kemang Kec. ilir barat 1 kab banyuasin sumatera
                                                                                                                    selatan, 30131
        15      BP KAPB (STA 76)                                                 Batching Plant                     Desa Pulau Harapan, Kec Sembawa Kab Banyuasin
        16      BP KAPB (STA 81)                                                 Batching Plant                     Desa suka mulya kec banyuasin kab banyuasin, 30916
        17      BP KAPB (STA 89)                                                 Batching Plant                     Suka Mulya, Kec. Banyuasin III, Kab. Banyuasin, Sumatera Selatan
                                                                                                                    30911
        18      BP CCTW (Cibubur)                                                Batching Plant                     Jln alternatif Cibubur - Cileungsi, Kp Pasar RT 001 RW 004, Desa
                                                                                                                    Cileungsi, Kec Cileungsi, Kabupaten Bogor
        19      BP CCTW (Setu)                                                   Batching Plant                     Ciledug, Setu, Bekasi, West Java 17320
        20      BP Bocimi                                                        Batching Plant                     Jl. Raya Sukaraja - Sukabumi, UPKB Perumnas, Pamuruyan, Kec.
                                                                                                                    Cibadak, Sukabumi Regency, Jawa Barat.
        21      BP PIK                                                           Batching Plant                     Jl Sungai Kendal No. 2, RT 004/008, Rorotan, Kec Cilincing, Kota
                                                                                                                    Jakarta Utara, Daerah Khusus Ibukota Jakarta 14140
        22      BP KAMAL                                                         Batching Plant                     Jl. Kamal Raya No.89, RW.2, Tegal Alur, Kec. Kalideres, Kota Jakarta
                                                                                                                    Barat, Daerah Khusus Ibukota Jakarta 11820
        23      BP Japeksel 1                                                    Batching Plant                     Jl. Alternatif Curug - Purwakarta, Desa Cilangkap, Kec. Babakan
                                                                                                                    Cikao, Kab. Purwakarta
        24      BP Japeksel 2                                                    Batching Plant                     Kampung Pakapuran RT/W 003/01 Desa Tamansari, Kecamatan
                                                                                                                    Pangkalan, Kabupaten Karawang
        25      BP Semarang                                                      Batching Plant                     Banjardowo, Genuk, Semarang, Jawa Tengah



                                                                                       7
Page 11
                                                                                                The original financial statements included herein are in
                                                                                                                              the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                                      PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                                              NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                                    JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                                 30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                                    ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                                   (UNAUDITED)

       No.                Unit Bisnis/ Business Unit                   Produk/ Product                              Alamat/ Address
        26   BP Solo                                              Batching Plant           Jl. Adi Sumarmo No. 195, Tohudan, Colomadu, Karanganyar
        27   BP Batang                                            Batching Plant           Rejosari, Lebo, Kec. Gringsing, Kabupaten Batang, Jawa Tengah
                                                                                           51281
        28   BP Pasuruan Probolinggo ( Muneng )                   Batching Plant           Krajan, Laweyan, Kec. Sumberasih, Probolinggo, Jawa Timur
        29   BP Pasuruan Probolinggo ( Gending )                  Batching Plant           Jl. Langai 2, Bulang, Kec. Gending, Probolinggo, Jawa Timur
        30   BP Palu                                              Batching Plant           Loli Oge, Kabupaten Donggala, Sulawesi Tengah
        31   BP IKN (Sepaku)                                      Batching Plant           Jalan Provinsi sepaku, Kab. Penajam Paser Utara, Kalimantan Timur

        32   BP IKN (Tempadung)                                   Batching Plant           Kariangau, Kec. Balikpapan Bar., Kota Balikpapan, Kalimantan Timur

        33   Stone Crusher Bojanegara                             Stone Crusher            Kampung Kejuruan, Desa Ukirsari, Kecamatan Bojonegara,
                                                                                           Kabupaten Serang, Banten 42454
        34   Stone Crusher Lumbang                                Stone Crusher            JL. Cukurguling Rt 15 / RW 05, Desa Bulukandang, Kecamatan
                                                                                           Lumbang, Kabupaten Pasuruan, Jawa Timur 67183
        35   Stone Crusher Palu                                   Stone Crusher            Loli Oge, Kabupaten Donggala, Sulawesi Tengah
        36   Pembangunan Plant Bojonegara                                                  Jl. Raya Bojonegara - Salir, Kp. Solor Lor RT/RW 018/008, Ds.
                                                                  Plant
                                                                                           Margagiri, Kec Bojonegara, Kab Serang- Banten.
        37   Pembangunan Penajam                                                           Jl. Kapao, Kel. Bulumuning, Kec Penajam, Kab. Penaja Paser Utara,
                                                                  Pembangunan/Erection
                                                                                           Prov. Kalimantan Timur
        38   Pembangunan Plant Cikopo                                                      Jl. Alternatif Cibatu - Subang, Desa Cikopo, Kecamatan Bungur Sari,
                                                                  Pembangunan/Erection
                                                                                           Kelurahan Cikopo
        39   Pembangunan Batching Cinere 2                        Pembangunan/Erection     Jl. RE. Martadinata Ciputat, Ciputat, Tangerang Selatan.
        40   Pembangunan Batching Plant Banyudono                                          Dusun Karang Kepoh RT5 RW 1, Desa Tanjung Sari. Kec
                                                                  Pembangunan/Erection
                                                                                           Banyundono. Kab. Boyolali
        41   Pembangunan Gasing Palembang                                                  Jalan Tanjung Api - Api km 14, kec. Talang kelapa, desa gasing, kab.
                                                                  Pembangunan/Erection
                                                                                           Banyuasin, Sumatera Selatan
        42   Pembangunan Klaten                                                            Karang Kulon, Dlimas, Ceper, Kabupaten Klaten, Jawa Tengah
                                                                  Pembangunan/Erection
                                                                                           57465, Indonesia
        43   Pembangunan Batching Plant Kuala Lombok                                       Desa Batu nyala Kec. Praya tengah, kab. Lombok tengah, Nusa
                                                                  Pembangunan/Erection
                                                                                           Tenggara Barat
        44   Pembangunan Batching Plant Penajam                                            Jl Kapao, Kel Gunung Seteleng, Kec Penajam, Kab Penajam Paser
                                                                  Pembangunan/Erection
                                                                                           Utara, Kaltim
        45   Pembangunan BP Paspro (BP Leces)                                              Desa jorongan Kec. Leces, Kab. Probolinggo, Jawa Timur (BP
                                                                  Pembangunan/Erection
                                                                                           Leces)
        46   Pembangunan BP Paspro (BP Muneng)                                             Desa Muneng kec. Sumber asih, Kab. Probolinggo, Jawa Timur (BP
                                                                  Pembangunan/Erection
                                                                                           Muneng)
        47   Pembangunan Litbang                                                           Dusun Krajan 2, Desa Curug, Kecamatan Klari, Kabupaten Karawanf
                                                                  Pembangunan/Erection
                                                                                           41371
        48   Pembangunan Quarry Lumbang                           Pembangunan/Erection     Desa Bulukandang Kec. Lumbang, Kab. Pasuruan, Jawa Timur
        49   Pembangunan BP TBPP (BP STA 76)                                               Desa Wonorejo Kec. Gunung Agung, Kab. Tulang Bawang Barat,
                                                                  Pembangunan/Erection
                                                                                           Lampung
        50   Pembangunan BP TBPP (BP STA 55)                                               Gunung sari Kec. Lambu Kibang, Kab. Tulang Bawang Barat,
                                                                  Pembangunan/Erection
                                                                                           Lampung
        51   Pembangunan Kuala Tanjung                            Pembangunan/Erection     Desa lalang kec. Kuala tanjung, kab. Batu bara, Sumatera Utara
        52   Pembangunan Quarry Sambi                             Pembangunan/Erection     Desa sambi kec. Simo, kab. Boyolali, Jawa Timur
        53   Pembangunan BP Japek Selatan II                      Pembangunan/Erection     Jl. Pekayon Raya, Bekasi Selatan, Bekasi
        54   Proyek Pembangunan Tol Pekanbaru Dumai Seksi 6                                Jl Ratusima No 12A, Kelurahan Simpang Tetap Darul Ihsan,
                                                                  Pembangunan/Erection
                                                                                           Kecamatan Dumai Barat, Dumai 28824
        55   Proyek Tanggul Fase A NCICD - Aliran Timur, Barat,   Project                  Jl. Sungai Kendal No. 32, RT 003/008, Kel. Rorotan, Kecamatan
             Tengah                                                                        Cilincing, Jakarta Utara
        56   Plant Lombok                                         Project
                                                                                           Jl Raya Praya-Keruak, Dusun Pepekat Daye, Desa Batu Nyala, Kec.
                                                                                           Praya, Kab. Lombok Tengah, Nusa Tenggara Barat 83582
                                                                          8
Page 12
                                                                                                                   The original financial statements included herein are in
                                                                                                                                                 the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                                                  PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                                                          NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                                                JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                                             30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                                                ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                                               (UNAUDITED)

       No.                      Unit Bisnis/ Business Unit                          Produk/ Product                                     Alamat/ Address
        57       Cibitung Cilincing Seksi IV                                                                  Rorotan Kirana Legacy, Jl Norfolk III Blok NF7 No. 23, Kel Rorotan
                                                                               Project
                                                                                                              Kec Cilincing Jakarta Utara, Kode pos 14140
         58      Proyek Cibitung Cilincing Erection Full Slab                                                 Rorotan Kirana Legacy, Jln Norfolk III, Blok NF 7 No 23 Kel Rorotan
                                                                               Project
                                                                                                              Kec Cilincing Jakarta Utara 14140
         59      RDMP RU V Pertamina                                                                          Kantor UP Pertamina RU V Balikpapan, Jl. Yos Sudarso No. 1 Area 9
                                                                               Project
                                                                                                              Pintu 5
         60      Proyek Manggis Bali                                           Project                        Jl Raya Ulakan-Karangasem no.88 Manggis, Kec. Manggis Kel.
                                                                                                              Karangasem 80871
         61      Proyek CCTW 2                                                 Project                        Legenda Wisata, Ruko Newton Square Blok U18/27 Cileungsi, Kec.
                                                                                                              Cileungsi, Bogor, Jawa Barat 16820
         62      Proyek JPM dan Revitalisasi Stasiun Sudirman                  Project                        Jl Galunggung RT 02 RW 003 Kelurahan Setiabudi Kecamatan
                                                                                                              Setiabudi Jakarta Selatan
         63      Proyek KAPB II Seksi 3                                        Project
                                                                                                              Perum Bukit Sejahtera Poligon, Jl. Sawit 8 No.J8, Bukit Lama, Kec. Ilir
                                                                                                              Bar. I, Kota Palembang, Sumatera Selatan 30121
         64      Proyek KAPB IV Seksi 3B                                       Project
                                                                                                              Perum Bukit Sejahtera Poligon, Jl. Sawit 8 No.J8, Bukit Lama, Kec. Ilir
                                                                                                              Bar. I, Kota Palembang, Sumatera Selatan 30121

         65      Proyek Loji Banger                                            Project
                                                                                                              Pekalongan Cluster, JL.Pembangunan No.2A RT.05/RW.06 Kav.No.2
                                                                                                              Kelurahan Kraton Lor, Pekalongan Utara, Jawa Tengah
         66      Laboratorium Litbang                                                                         Dusun Krajan 2, Desa Curug, Kecamatan Klari, Kabupaten
                                                                               Litbang
                                                                                                              Karawang 41371
         67      Workshop Peralatan Cikopo                                     Workshop                       Jl. Cinta Karya/Jl. Alternatif Cibatu-Cikopo, Desa Cikopo,
                                                                                                              Kec.Bungursari, Purwakarta 41181


       Perusahaan tergabung dalam kelompok usaha                                                            The   Company      was      incorporated                                 by
       PT Waskita Karya (Persero) Tbk (“WSKT”).                                                             PT Waskita Karya (Persero) Tbk (“WSKT”).

       Susunan pengurus Perusahaan pada tanggal                                                             The composition of the Company’s management
       30 Juni 2023 dan 31 Desember 2022 adalah                                                             as of June 30, 2023 and December 31, 2022 is
       sebagai berikut:                                                                                     as follows:

                                                          30 Juni/                       31 Desember/                    30 Juni/
                                                          June 30                        December 31                     June 30
                                                           2023                              2022                         2022

       Dewan Komisaris                                                                                                                                        Board of Commissioners
       Komisaris Utama                             Agus Budiman Manalu                   Poerwanto*                 Bambang Rianto                              President Commissioner
       Komisaris                                        Poerwanto                            --                        Eka Desniati                                       Commissioner
       Komisaris                                   Asep Arofah Permana              Asep Arofah Permana             Hadi Sucahyono                                        Commissioner
       Komisaris Independen                          Fathur Rokhman                 Agus Budiman Manalu           Agus Budiman Manalu                        Independent Commissioner
       Komisaris Independen                            Abianti Riana                    Abianti Riana                 Abianti Riana                          Independent Commissioner

       Dewan Direksi                                                                                                                                                 Board of Directors
       Direktur Utama                              FX Poerbayu Ratsunu              FX Poerbayu Ratsunu            FX Poerbayu Ratsunu                                President Director
       Direktur                                       Asep Mudzakir                    Asep Mudzakir                  Asep Mudzakir                                             Director
       Direktur                                        Asep Kurnia                      Asep Kurnia                    Asep Kurnia                                              Director
       Direktur                                         Sugiharto                        Sugiharto                      Sugiharto                                               Director
       Direktur                                   Bambang Dwi Wijayanto            Bambang Dwi Wijayanto          Bambang Dwi Wijayanto                                         Director

       Divisi Internal Audit                                                         31 Des/Dec 31, 2016                                                         Internal Audit Division
       Vice President of Internal Audit        Mohammad Abi Yudha Prawira       Mohammad Abi Yudha Prawira            Irvan Panjaitan                     Vice President of Internal Audit


       Komite Audit                                                                 31 Des/Dec 31, 2016                                                                Audit Committee
       Ketua                                       Agus Budiman Manalu              Agus Budiman Manalu            Agus Budiman Manalu                                        President
       Anggota                                       Jonni Hutahaean                  Jonni Hutahaean                Jonni Hutahaean                                           Member
       Anggota                                         Puji Wibowo                  Rizky Prasetyo Asgor           Rizky Prasetyo Asgor                                        Member



       Komite Pemantau Manajemen Risiko                                              31 Des/Dec 31, 2016                                      Risk Management Monitoring Committee
       Ketua                                           Abianti Riana                     Abianti Riana               Abdul Ghofarrozin                                    President
       Anggota                                         Sapto Wiratno                   Inggir Elerida L.T            Inggir Elerida L.T                                    Member
       Anggota                                 Belladonna Troxylon Maulianda           Lukas Dewantoro               Lukas Dewantoro                                       Member
       Anggota                                                                                                        Hadi Sucahyono                                       Member



       Sekretaris Perusahaan                          Fandy Dewanto                      Fandy Dewanto           Siti Fathia Maisa Syafurah                        Corporate Secretary
       *)Pelaksana Tugas (Ad Interim )


                                                                                    9
Page 13
                                                                      The original financial statements included herein are in
                                                                                                    the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                              PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                      NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022            JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                         30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                            ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                           (UNAUDITED)

       Berdasarkan Risalah Rapat Umum Pemegang                   Based on the Minutes of Annual General
       Saham Tahunan No 26 tanggal 21 Juni 2023,                 Meeting of Shareholders No. 26 dated June 21,
       salah satu mata acaranya yaitu pergantian                 2023, one of the agenda items was the change
       pengurus Perusahaan, sehingga diputuskan                  of the Company's management, so it was
       sebagai berikut:                                          decided as follows:

       1. Mengalihkan penugasan Tuan Agus Budiman                1. Transferred the assignment of Mr. Agus
           Manalu yang semula sebagai Komisaris                     Budiman Manalu, who was originally an
           Independen       menjadi      Komisaris                  Independent Commissioner to become the
           Utama/Independen      dengan     masa                    Main/Independent Commissioner with a
           jabatanmeneruskan sisa masa jabatan                      term of office continuing the remaining term
           berdasarkan keputusan Rapat Umum                         of office based on the decision of the
           Pemegang Saham Perseroan                                 Company's        General      Meeting      of
                                                                    Shareholders
       2. Mengangkat Tuan Fathur Rokhman sebagai                 2. Appointed Mr. Fathur Rokhman as
          Komisaris Independen.                                     Independent Commissioner.

       Sehingga susunan Dewan Komisaris menjadi                  So that the composition of the Board of
       sebagai berikut:                                          Commissioners is as follows:
       •    Agus Budiman Manalu sebagai Komisaris                • Agus Budiman Manalu as Main/Independent
            Utama/Independen                                        Commissioner
       •    Abianti     Riana  sebagai    Komisaris              • Abianti Riana as Independent Commissioner
            Independen
       •    Fathur Rokhman sebagai Komisaris                     •    Fathur   Rokhman     as    Independent
            Independen                                               Commissioner
       •    Asep Arofah sebagai Komisaris                        •   Asep Arofah as Commissioner
       •    Poerwanto sebagai Komisaris                          •   Poerwanto as Commissioner

       Berdasakan Keputusan Dewan Komisaris No                   Based on the Decree of the Board of
       04/SK/WBP/DK/2023 tanggal 24 Mei 2023                     Commissioners No 04/SK/WBP/DK/2023 dated
       tentang Pemberhentian dan Pengangkatan                    May 24, 2023 concerning the Dismissal and
       Anggota Komite Pemantau Manajemen Risiko                  Appointment of Members of the Risk
       serta Penetapan Susunan Komite Pemantau                   Management Monitoring Committee and the
       Manajemen Risiko, memutuskan:                             Determination of the Composition of the Risk
                                                                 Management Monitoring Committee, decide:
       1. Memberhentikan dengan hormat Sdri Inggir               1. Respectfully dismiss Sdri Inggir Elerida and
          Elerida dan Sdr Lukas Dewantoro                           Sdr Lukas Dewantoro
       2. Mengangkat Sdr Sapto Wiratno dan Sdri                  2. Appointed Sdr Sapto Wiratno and Sdri
          Belladona Troxylon Maulianda.                             Belladona Troxylon Maulianda.

       Sehingga susunan komite pemantau risiko                   So that the composition of the risk monitoring
       menjadi sebagai berikut:                                  committee is as follows:
       •    Sdri Abianti Riana sebagai Ketua                     • Sdri Abianti Riana as Chairman
       •    Sdr Sapto Wiratno sebagai Anggota                    • Mr. Sapto Wiratno as Member
       •    Sdri Belladona Troxylon Maulianda                    • Sdri Belladona Troxylon Maulianda as
            sebagai Anggota                                         Member

       Berdasarkan Surat No 08/WBP/DKI/2023                      Based on Letter No. 08/WBP/DKI/2023 dated
       tanggal 24 Januari 2023 perihal Penyampaian               January 24, 2023 regarding the Submission of
       Pemberhentian dan Pengangkatan serta                      Dismissal and Appointment and Determination
       Penetapan Susunan Komite Audit Perusahaam                 of the Composition of the Audit Committee of the
       yang dilampiri dengan Surat Keputusan                     Company which is attached with the Decree of
       Komisaris           Perusahaan          No.               the Commissioner of the Company No.
       01/SK/WBP/DK/2023 Tentang Pemberhentian                   01/SK/WBP/DK/2023 concerning Dismissal and
       dan Pengangkatan Anggota Komite Audit serta               Appointment of Members of the Audit Committee
       Penetapan Susunan Komite Audit Perusahaan,                and Determination of the Composition of the
       telah diputuskan memberhentikan Rizky                     Audit Committee of the Company, it has been
       Prasetya Asgor dan mengangkat Puji Wibowo                 decided to dismiss Rizky Prasetya Asgor and
       sebagai anggota komite audit dengan masa                  appoint Puji Wibowo as a member of the audit
       penugasan selama 3 tahun terhitung sejak                  committee with an assignment period of 3 years
       tanggal 24 Januari 2023 sampai dengan 23                  from January 24, 2023 to January 23, 2026.
       Januari 2026.
                                                      10
Page 14
                                                                           The original financial statements included herein are in
                                                                                                         the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                  PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                          NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                             30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                               (UNAUDITED)

       Mohammad Abi Yudha Prawira ditunjuk sebagai                   Mohammad Abi Yudha Prawira was appointed
       penanggung jawab sementara General Manager                    as the Acting General Manager of Internal Audit
       dari divisi internal audit berdasarkan Keputusan              Division based on the Decree of the Board of
       Direksi No. 76/SK/WBP/PEN/2022 tanggal                        Directors No. 76/SK/WBP/PEN/2022 dated
       16 Agustus 2022 tentang Pejabat Struktural &                  August 16, 2022 concerning Structural Officials
       Pejabat Fungsional.                                           & Functional Officials.

       Persetujuan perubahan susunan pengurus                        The approval of changes in the composition of
       Perusahaan tentang Susunan Dewan Komisaris                    the Company's Board of Commissioners was
       berdasarkan surat No. 295/XII/2022 tanggal                    based on the letter No. 295/XII/2022 dated
       14 Desember 2022.                                             December 14, 2022.

       Berdasarkan Risalah Rapat Umum Pemegang                       Based on the Minutes of Extraordinary General
       Saham     Luar   Biasa    No.  30    tanggal                  Meeting of Shareholders No. 30 dated
       14 Desember 2022 dan menindaklanjuti Surat                    December 14, 2022 and following up
       Dewan Komisaris No. 33/RHS/WK/DK/2022                         on the Letter of the Board of Commissioners
       tanggal 12 Desember 2022 perihal Persetujuan                  No.          33/RHS/WK/DK/2022          dated
       Perubahan Pengurus PT Waskita Beton Precast                   December 12, 2022 regarding the Approval for
       Tbk (“WSBP”) yang menjadi kewenangan Dewan                    Changes in Management of PT Waskita Beton
       Komisaris PT Waskita Karya (Persero) Tbk,                     Precast Tbk (“WSBP”) which is under the
       dengan ini PT Waskita Karya (Persero) Tbk                     authority of the Board of Commissioners of PT
       selaku pemegang Saham mengusulkan untuk                       Waskita Karya (Persero) Tbk, hereby PT Waskita
       melakukan perubahan pengurus Perusahaan,                      Karya (Persero) Tbk as shareholder proposed to
       sebagai berikut:                                              make changes to the management of the
                                                                     Company, as follows:

       Memberhentikan dengan hormat:                                 Dismiss with honor:

       •    Bambang Rianto sebagi Komisaris Utama                     •   Bambang       Rianto    as   President
                                                                          Commissioner
       •    Hadi Sucahyono sebagai Komisaris                          •   Hadi Sucahyono as Commissioner
       •    Eka Desniati sebagai Komisaris                            •   Eka Desniati as Commissioner

       Mengangkat sebagai berikut:                                   Appointed the following:

       •    Asep Arofah sebagai Komisaris                             •   Asep Arofah as Commissioner
       •    Poerwanto sebagai Komisaris Utama                         •   Poerwanto as President Commissioner

       Poerwanto ditunjuk untuk melaksanakan tugas,                  Poerwanto was appointed to carry out the duties,
       wewenang, kewajiban dan tanggung jawab                        authorities, obligations and responsibilities as
       sebagai Komisaris Utama sampai dengan                         President Commissioner until a new President
       ditetapkan Komisaris Utama baru oleh Rapat                    Commissioner is appointed by the General
       Umum Pemegang Saham.                                          Meeting of Shareholders.

       Sehubungan dengan berakhirnya masa jabatan                    In connection with the end of Hadi Sucahyono's
       Hadi Sucahyono sebagai Komisaris, maka                        term of office as Commissioner, Hadi
       jabatan Hadi Sucahyono sebagai anggota                        Sucahyono's position as a member of the Risk
       Komite Pemantau Manajemen Risiko berhenti                     Management Monitoring Committee ceases
       dengan sendirinya.                                            automatically.

       Berdasarkan surat Keputusan Dewan Komisaris                   Based on the Decree of the Board of
       No. 02/SK/WBP/DK/2022 tanggal 5 Juli 2022                     Commissioners No. 02/SK/WBP/DK/2022 dated
       tentang Pemberhentian dan Pengangkatan                        July 5, 2022 concerning the Dismissal and
       Ketua Komite Pemantau Manajemen Risiko                        Appointment of the President of the Risk
       serta Penetapan Susunan Komite Pemantau                       Management Monitoring Committee and the
       Manajemen Risiko, telah ditetapkan sebagai                    Determination of the Composition of the Risk
       berikut:                                                      Management Monitoring Committee,         the
                                                                     following have been decided:




                                                          11
Page 15
                                                                          The original financial statements included herein are in
                                                                                                        the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                 PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                         NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022               JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                            30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                               ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                              (UNAUDITED)

        1.   Memberhentikan dengan hormat                           1.   Dismiss with honor
             •  Tn. Abdul Ghofarrozin sebagai Ketua                      •   Mr. Abdul Ghofarrozin as President of
                Komite Pemantau Manajemen Risiko.                            Risk       Management       Monitoring
                                                                             Committee.
        2.   Mengangkat nama sebagai berikut:                       2.   Appoint the following:
             •  Ny. Abianti Riana sebagai Ketua Komite                   •   Mrs. Abianti Riana as President of Risk
                Pemantau Manajemen Risiko.                                   Management Monitoring Committee.

        Jumlah karyawan yang dimiliki oleh Perusahaan               The number of employees owned by the
        sebesar 876 pegawai per 30 Juni 2023, sebesar               Company is 876 employees as of 30 June 2023,
        890 pegawai per 31 Desember 2022 dan                        890 employees as of 31 December 2022 and 833
        sebesar 833 pegawai per 30 Juni 2022 (tidak                 employees as of 30 June 2022 (unaudited).
        diaudit).

   d.   Penawaran       Umum      Perdana      Saham            d. Initial Public Offering of Shares of the
        Perusahaan                                                  Company

        Saham                                                       Shares

        Pada tanggal 20 Mei 2016, Perusahaan                        On May 20, 2016, the Company obtained a
        memperoleh penetapan efek berupa efek                       determination of securities in the form of Islamic
        Syariah dari Dewan Komisioner Otoritas Jasa                 securities from the Board of Commissioners of
        Keuangan (OJK) berdasarkan surat keputusan                  Indonesia Financial Services Authority (OJK)
        No. KCP.22/D.04/2016 untuk melakukan                        under the decree No. KCP.22/D.04/2016 for its
        penawaran umum perdana kepada masyarakat                    initial public offering of 10,544,463,000 shares
        atas 10.544.463.000 saham dengan nilai                      with a par value of Rp100 per share at the
        nominal Rp100 per saham dengan harga                        offering price of Rp490 per share.
        penawaran Rp490 per saham.

        Pada tanggal 8 September 2016, Perusahaan                   On September 8, 2016, the Company obtained
        memperoleh pemberitahuan pernyataan efektif                 the notice of effectivity from OJK in its letter
        dari OJK dengan suratnya No. S-495/D.06/2016.               No. S-495/D.06/2016.

        Pada tanggal 20 September 2016, Perusahaan                  On September 20, 2016, the Company has listed
        telah mencatatkan 40% atau sebanyak                         40% or 10,544,463,000 new shares on the
        10.544.463.000 saham baru pada Bursa Efek                   Indonesia Stock Exchange. All shares issued by
        Indonesia. Seluruh saham yang diterbitkan oleh              the Company have been fully paid.
        Perusahaan telah disetor penuh.

        Pada tanggal 30 Juni 2023 dan 31 Desember                   As of June 30, 2023 and December 31, 2022, all
        2022 seluruh saham ditempatkan Perusahaan                   of the Company's outstanding shares have been
        telah dicatatkan pada Bursa Efek Indonesia                  listed on the Indonesia Stock Exchange
        (Catatan 23).                                               (Note 23).

        Pada tanggal 1 Agustus 2022, terdapat                       On August 1, 2022, there was an announcement
        pengumuman Potensi Delisting Perusahaan                     of the potential Delisting of the Listed Company
        Tercatat PT Waskita Beton Precast Tbk                       PT Waskita Beton Precast Tbk (WSBP)
        (WSBP) tercatat di Papan: Pengembangan                      listed    on     the      Board:     Development
        No.     Peng-00042/BEI.PP3/08-2022,     telah               No. Peng-00042/BEI.PP3/08-2022, it has been
        disampaikan bahwa saham Perusahaan telah                    conveyed that the shares of the Company have
        disuspensi di Pasar Modal selama 6 bulan dan                been suspended in the Capital Market for 6
        masa suspensi akan mencapai 24 bulan sampai                 months and the suspension period will reach 24
        tanggal 31 Januari 2024.                                    months until January 31, 2024.

        Potensi Delisting Perusahaan Tercatat PT                    Based on the Announcement of the Potential
        Waskita Beton Precast Tbk (WSBP) Tbk                        Delisting of Listed Company PT Waskita Beton
        Potential Delisting of Listed Company PT                    Precast Tbk (WSBP) which is Listed on the
        Waskita Beton Precast Tbk (WSBP) Tbk                        Board        Development        No.       Peng-
        Berdasarkan Pengumuman Potensi Delisting                    00010/BEI.PP3/01-2023 dated January 31,
        Perusahaan Tercatat PT Waskita Beton Precast                2023, it was announced that the shares of PT
        Tbk (WSBP) Tercatat di Papan Pengembangan                   Waskita Beton Precast Tbk (the Company) have
        No. Peng-00010/BEI.PP3/01-2023 tanggal 31                   been suspended in all markets for 12 months and

                                                         12
Page 16
                                                                               The original financial statements included herein are in
                                                                                                             the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                     PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                             NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                   JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                   ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                  (UNAUDITED)

       Januari 2023, disampaikan bahwa saham PT                         the suspension period will be extended for 24
       Waskita Beton Precast Tbk (Perseroan) telah                      months until January 31, 2024.
       disuspensi di seluruh pasar selama 12 bulan dan
       masa suspensi akan mencapai 24 bulan pada
       tanggal 31 Januari 2024.

       Berdasarkan      Pengumuman         Pencabutan                   Based on the Announcement of the Revocation
       Penghentian Sementara Perdagangan Efek PT                        of the Temporary Suspension of PT Waskita
       Waskita Beton Precast Tbk yang tercatat di                       Beton Precast Tbk Securities Trading which is
       papan     Pengembangan       No.    Peng-UPT-                    listed on the Development Board No. Peng-UPT-
       00005/BEI.PP/03- 2023 tanggal 17 Maret 2023,                     00005/BEI.PP/03-2023 dated March 17, 2023,
       telah terpenuhinya kewajiban Perseroan, maka                     the Company's obligations have been fulfilled,
       Bursa Efek Indonesia (Bursa) memutuskan untuk                    and the Indonesia Stock Exchange (Bursa) has
       melakukan pencabutan penghentian sementara                       decided to revoke the temporary suspension of
       Perdagangan Efek (Saham dan Obligasi)                            the Company's trading securities (Shares and
       Perusahaan di seluruh pasar terhitung sejak Sesi                 Bonds) throughout the market starting from
       II Perdagangan Efek pada Jumat, tanggal 17                       Session II of Securities Trading on Friday, March
       Maret 2023.                                                      17, 2023.

       Obligasi                                                         Bonds

       Perusahaan telah menerbitkan obligasi dengan                     The Company has issued bonds with the
       rincian sebagai berikut:                                         following details as follows:

                                                 Jumlah/
                         Obligasi/               Amount               Tahun/      Tanggal Penerbitan/             Jatuh Tempo/
         No               Bonds                    Rp                 Years        Date of Issuance                 Due Date

          1       Berkelanjutan I Tahap I/     500.000.000.000          3              8 Juli 2019/                 5 Juli 2022/
                  Shelf I Phase I Tranche                                              July 8, 2019                 July 5, 2022

          2       Berkelanjutan I Tahap II/   1.500.000.000.000         3           30 Oktober 2019/            30 Oktober 2022/
                  Shelf I Phase II Tranche                                          October 30, 2019            October 30, 2022

       Penyampaian Hasil Rapat Umum Pemegang                           Submission of the Results of the General
       Obligasi atas Obligasi Berkelanjutan I Tahap                    Meeting of Bondholders for the 2019 Shelf-
       II Tahun 2019                                                   Registered Bonds I Phase II

       Berdasarkan     Surat     Keterangan      No               R    Based      on    the    Statement Letter   No.
       34/NOT/SK/WBPRUPO 1/II/2023 dari Notaris                   a    34/NOT/SK/WBPRUPO 1/II/2023 of Notary
       Dewantari Handayani, SH, MPA, telah diadakan                    Dewantari Handayani, SH, MPA, a General
       Rapat Umum Pemegang Obligasi Berkelanjutan                      Meeting of Waskita Beton Precast Phase II Year
       I Waskita Beton Precast Tahap II Tahun 2019                     2019 Sustainable Bond Holders (RUPO) was
       (RUPO), dengan agenda sebagai berikut:                          held, with the following agenda:

       1. Persetujuan         perubahan       dan/atau                 1. Approval of amendments and/or additions to
          penambahan Perjanjian Perwaliamanatan                           the Trustee Agreement of Waskita Beton
          Obligasi Berkelanjutan I Waskita Beton                          Precast Phase II Year 2019 Sustainable
          Precast Tahap II Tahun 2019, Akta No 47                         Bonds I, Deed No. 47 dated October 8, 2019,
          tanggal 8 Oktober 2019, yang dibuat                             drawn up before Jose Dima Satria SH, M.Kn,
          dihadapan Jose Dima Satria S.H, M.Kn,                           Notary in the Administrative City of South
          Notaris di Kota Administrasi Jakarta Selatan,                   Jakarta, along with the amendments, and
          berikut perubahannya, dan perjanjian lainnya                    other agreements related to the Trusteeship
          yang      berkaitan     dengan     Perjanjian                   Agreement (if any) to comply with the ratified
          Perwaliamanatan (apabila ada) untuk                             Settlement Agreement which has been ratified
          disesuaikan dengan Perjanjian Perdamaian                        (homologation) based on the Decision of the
          yang     telah     disahkan     (homologasi)                    Commercial Court at the Central Jakarta
          berdasarkan Putusan Pengadilan Niaga                            District Court Number 497/Pdt.SusPKPU/
          pada Pengadilan Negeri Jakarta Pusat                            2021/PN.NIAGA.JKT.PST dated June 28,
          Nomor 497/Pdt.SusPKPU/2021/PN.NIAGA.                            2022.
          JKT.PST tanggal 28 Juni 2022.
                                                          13
Page 17
                                                                            The original financial statements included herein are in
                                                                                                          the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                   PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                           NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                 JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                              30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                 ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                (UNAUDITED)


       2. Persetujuan       perubahan        dan/atau                2. Approval of changes and/or additions to
          penambahan ketentuan dalam Perjanjian                         provisions in the Trusteeship Agreement for
          Perwaliamanatan Obligasi Berkelanjutan I                      the Waskita Beton Precast Phase II Year 2019
          Waskita Beton Precast Tahap II Tahun 2019,                    Sustainable Bonds I, Deed No. 37 dated April
          Akta No. 37 tanggal 15 April 2019, yang                       15, 2019, drawn up before Fathia Helmi, S.H.,
          dibuat dihadapan Fathia Helmi, S.H., Notaris                  Notary in the Administrative City of South
          di Kota Administrasi Jakarta Selatan, berikut                 Jakarta, along with the amendments.
          perubahannya.

       Berdasarkan     Surat     Keterangan  No                      Based on Statement Letter No 35/NOT/SK/WBP
       35/NOT/SK/WBP RUPO 2/II/2023 tanggal 15                       RUPO 2/II/2023 dated February 15, 2023, a
       Februari 2023, telah diadakan Rapat Umum                      General Meeting of Waskita Beton Precast Phase
       Pemegang Obligasi Berkelanjutan I Waskita                     I 2019 Sustainable Bonds I Year 2019 Bond
       Beton Precast Tahap I Tahun 2019 (RUPO),                      Holders (RUPO) was held, with the following
       dengan agenda sebagai berikut:                                agenda:

       1. Persetujuan        perubahan         dan/atau              1. Approval of amendments and/or additions to
          penambahan Perjanjian Perwaliamanatan                         the Trustee Agreement of Waskita Beton
          Obligasi Berkelanjutan I Waskita Beton                        Precast Phase I 2019 Sustainable Bonds I,
          Precast Tahap I Tahun 2019, Akta No 37                        Deed No. 37 dated 15 April 2019, made before
          tanggal 15 April 2019, yang dibuat dihadapan                  Fathia Helmi S.H., Notary in Jakarta, along
          Fathia Helmi S.H., Notaris di Jakarta, berikut                with the amendments, and other agreements
          perubahannya, dan perjanjian lainnya yang                     related to the Agreement Trusteeship (if any)
          berkaitan          dengan          Perjanjian                 to comply with the ratified Settlement
          Perwaliamanatan (apabila ada) untuk                           Agreement (homologation) based on the
          disesuaikan dengan Perjanjian Perdamaian                      Decision of the Commercial Court at the
          yang     telah     disahkan     (homologasi)                  Central     Jakarta  District   Court     No.
          berdasarkan Putusan Pengadilan Niaga                          497/Pdt.SusPKPU/2021/PN.NIAGA. JKT.PST
          pada Pengadilan Negeri Jakarta Pusat No.                      dated June 28, 2022.
          497/Pdt.SusPKPU/2021/PN.NIAGA.JKT.PS
          T tanggal 28 Juni 2022.

       2. Persetujuan        perubahan       dan/atau                2.Approval of changes and/or additions to
          penambahan ketentuan dalam Perjanjian                         provisions in the Trusteeship Agreement for
          Perwaliamanatan Obligasi Berkelanjutan                        the Iwaskita Beton Precast Phase II Year 2019
          Iwaskita Beton Precast Tahap II Tahun 2019,                   Sustainable Bonds, Deed no 47 dated October
          Akta no 47 tanggal 8 Oktober 2019, yang                       8, 2019, made by Fathia Helmi, S.H., Notary
          dibuat Fathia Helmi, S.H., Notaris di Kota                    in the City of Jakarta, along with the
          Jakarta, berikut perubahannya.                                amendments.

       Penyampaian Hasil Rapat Umum Pemegang                         Submission of the Results of the General
       Obligasi atas Obligasi Berkelanjutan I Tahap                  Meeting of Bondholders for the 2019 Shelf-
       II Tahun 2019                                                 Registered Bonds I Phase II

       Berdasarkan Akta Notaris No. 22 tanggal                  R    Based on Notarial Deed No. 22 dated
       23 November 2022 dari Notaris Dewantari                  a    November 23, 2022 of Notary Dewantari
       Handayani S.H., MPA., Notaris di Jakarta,                     Handayani S.H., MPA., Notary in Jakarta,
       perihal hasil Rapat Umum Pemegang Obligasi                    regarding the results of the Bondholders' General
       atas Obligasi berkelanjutan I Tahap II Tahun                  Meeting of Sustainable Bonds I Phase II of 2019,
       2019, telah ditetapkan bahwa:                                 it has been determined that:

       1. Tidak menyetujui usulan dari waliamanat                    1. Disagreed with the proposal from the trustee at
          dalam Rapat Umum Pemegang Obligasi                            the General Meeting of Bondholders for
          untuk Perubahan/ Adendum Akta Perjanjian                      Amendment/Addendum to the Deed of
          Perwaliamanatan Obligasi Berkelanjutan I                      Trusteeship Agreement for Sustainable Bonds
          Waskita Beton Precast Tahap II Tahun 2019                     I Waskita Beton Precast Phase II Year 2019
          No. 47 tanggal 8 Oktober 2019 dari Notaris                    No. 47 dated October 8, 2019 of Notary Jose
          Jose Dima Satria S.H., M.Kn.                                  Dima Satria S.H., M.Kn.

       2. Tidak menyetujui usulan dari waliamanat                    2.Disagreed with the proposal from the trustee at
          dalam Rapat Umum Pemegang Obligasi                            the General Meeting of Bondholders for the
          untuk Laporan penunjukan Agen Pemantau                        Report on the appointment of an Independent
                                                           14
Page 18
                                                                            The original financial statements included herein are in
                                                                                                          the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                 PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                         NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022               JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                            30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                               ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                              (UNAUDITED)

            Independen untuk memantau pelaksanaan                        Monitoring    Agent      to   monitor    the
            Perjanjian Perdamaian yang telah disahkan                    implementation of the Settlement Agreement
            (homologasi)      berdasarkan     Putusan                    which has been ratified (homologation) based
            Pengadilan      Negeri   Jakarta    Pusat                    on Decision of the Central Jakarta District
            No.     497/Pdt.Sus-PKPU/2021/PN.NIAGA.                      Court        No.497/Pdt.SusPKPU/2021/PN.
            JKT.PST tanggal 28 Juni 2022, antara lain                    NIAGA.JKT.PST dated June 28, 2022, among
            melakukan pengawasan cash flow dan                           other things, monitoring cash flows and
            memberikan laporan ketersediaan Cash                         providing reports on the availability of the
            Flow Available for Debt Services (CFADS)                     Company's Cash Flow Available for Debt
            Perusahaan.                                                  Services (CFADS).

       Pada tanggal 22 Maret 2022, Perusahaan                      On March 22, 2022, the Company implemented
       melaksanakan Rapat Umum Pemegang                            General Meeting of Bondholders (RUPO) with the
       Obligasi (RUPO) dengan hasil sebagai berikut:               results as follows:

       I.    Rapat    Umum       Pemegang     Obligasi              I.    The General Meeting of Sustainable Bond
             Berkelanjutan I Tahap I Tahun 2019 sesuai                    Holders I Phase I Year 2019 in accordance
             Cover Note No. 51/NOT/SK/PT WBP-                             with Cover Note No. 51/NOT/SK/PT
             RUPO1/III/2022 tanggal 22 Maret 2022 dari                    WBPRUPO 1/III/2022 dated March 22, 2022
             Notaris Dewantari Handayani, S.H., M.P.A                     of Notary Dewantari Handayani, S.H.,
             menetapkan hal-hal berikut:                                  M.P.A. sets the following:

             a. Sehubungan     dengan     penjelasan                      a.    In connection with the explanation by
                Perusahaan (Dalam PKPU) selaku                                  the Company (In PKPU) as the Issuer
                Emiten pada RUPO tanggal 22 Maret                               at the GMS on March 22, 2022 that has
                2022 yang belum menyampaikan draf                               not    submitted    a    draft  peace
                rencana/proposal perdamaian, maka                               plan/proposal,     the     bondholders
                pemegang obligasi meminta hal berikut:                          requested the following:

                •   Perusahaan segera menyusun dan                              •    The      Company        immediately
                    menyampaikan rencana/proposal                                    prepares and submits a peace
                    perdamaian;                                                      plan/proposal;
                •   Didalam penyusunan rencana/                                 •    In     preparing     the     peace
                    proposal perdamaian, Perusahaan                                  plan/proposal, the Company as the
                    selaku Emiten untuk mengusulkan                                  Issuer is to propose provisions
                    ketentuan mengenai penyelesaian                                  regarding    the    settlement    of
                    kewajiban yang tidak merugikan                                   obligations that do not harm the
                    pemegang obligasi dan mengacu                                    bondholders and refers to the
                    kepada ketentuan antara lain dalam                               provisions, among others, in Article
                    pasal 5 Perjanjian Perwaliamanatan                               5 of the Trusteeship Agreement of
                    Obligasi Berkelanjutan I Waskita                                 Waskita Beton Precast Phase I
                    Beton Precast Tahap I tahun 2019,                                2019 Sustainable Bonds, Deed
                    Akta No 37 tanggal 19 April 2019,                                No. 37 dated April 19, 2019, which
                    yang dibuat di hadapan Fathiah                                   was made in the presence of
                    Helmi SH., notaris di Jakarta,                                   Fathiah Helmi SH., Notary in
                    berikut perubahan-perubahannya.                                  Jakarta, and its amendments.

             b. Para pemegang Obligasi mewajibkan                         b.    Bondholders require the Company (In
                kepada Perusahaan (Dalam PKPU)                                  PKPU) as the Issuer to provide a peace
                selaku Emiten untuk memberikan                                  plan/proposal for approval to all
                rencana/proposal perdamaian yang                                Bondholders accompanied by a letter
                akan dimintakan persetujuan kepada                              of introduction to PT Bank Mega Tbk as
                seluruh Pemegang Obligasi dengan                                the Trustee no later than 7 working
                disertai surat pengantar kepada PT                              days prior to the Discussion Meeting
                Bank Mega Tbk selaku wali Amanat                                Peace Plan/Proposal and/or Peace
                selambat-lambatnya 7 hari kerja                                 Plan/Proposal Voting Meeting.
                sebelum       Rapat     Pembahasan
                Rencana/Proposal         Perdamaian
                dan/atau Rapat Voting/Pemungutan
                Suara Rencana/Proposal Perdamaian.



                                                         15
Page 19
                                                                         The original financial statements included herein are in
                                                                                                       the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                 PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                         NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022               JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                            30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                               ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                              (UNAUDITED)

           c. Menyetujui penunjukan/pembentukan                        c.Approved the appointment/ establishment
              Tim Kecil sebagai wakil para                                  of the Small Team as representatives
              Pemegang Obligasi, yang anggotanya                            of the Bondholders, whose members
              terdiri dari:                                                 consist of:

              •   PT BNI Aset Management                                     •    PT BNI Asset Management
              •   Dana Pensiun Iuran Pasti Bogasari                          •    Bogasari Defined Contribution
                                                                                  Pension Fund
              •   PT    Henan      Putihrai  Asset                           •    PT    Henan     Putihrai   Asset
                  Management                                                      Management
              •   PT Insight Investment Asset                                •    PT Insight Investment Asset
                  Management                                                      Management
              •   PT Sucorinvest Asset Management                            •    PT Sucorinvest Asset Management

              Selanjutnya, para Pemegang Obligasi                            Furthermore, the Bondholders hereby
              dengan ini memberikan kuasa kepada                             authorize the Small Team of
              Tim Kecil Pemegang Obligasi untuk                              Bondholder Representatives to take
              melakukan tindakan yang diperlukan                             the necessary actions for the benefit of
              untuk kepentingan Pemegang Obligasi                            the Bondholders in connection with the
              sehubungan dengan proses PKPU                                  PKPU process against the Company,
              terhadap Perusahaan, termasuk namun                            including but not limited to:
              tidak terbatas untuk:

              •    Bersama-sama dengan pihak                                 •      Together with PT Bank Mega Tbk
                   PT Bank Mega Tbk selaku                                          as the Trustee, to attend every
                   Wali Amanat, untuk menghadiri                                    creditor meeting, discuss/propose
                   setiap       rapat        kreditur,                              the     peace     plans/proposals
                   membahas/mengusulkan          atas                               submitted by the Company,
                   rencana/ proposal perdamaian                                     attend voting meetings on the
                   yang diajukan oleh Perusahaan,                                   peace plans/proposals submitted
                   mengikuti rapat pemungutan                                       by the Company;
                   suara         (voting)        atas
                   rencana/proposal       perdamaian
                   yang diajukan oleh Perusahaan;

              •    Mengambil Keputusan untuk                                 •      Make decisions to approve or
                   menyetujui atau tidak menyetujui                                 disagree with the PKPU time
                   atas perpanjangan waktu PKPU                                     extension (if any) and/or make
                   (apabila ada) dan/atau mengambil                                 decisions    to    approve   or
                   keputusan     untuk    menyetujui                                disapprove       the      peace
                   atau tidak menyetujui atas                                       plan/proposal submitted by the
                   rencana/proposal      perdamaian                                 Company.
                   yang diajukan oleh Perusahaan.

           d. Apabila Obligasi Berkelanjutan I                         d.    If the Waskita Beton Precast I Year
              Waskita Beton Precast Tahun I Tahun                            2019      Sustainable    Bonds     are
              2019 dialihkan kepada pihak lain                               transferred to another party after the
              setelah RUPO tanggal 22 Maret 2022,                            RUPO on March 22, 2022, then the
              maka pihak yang menerima Pengalihan                            party receiving the Transfer of Waskita
              Obligasi Berkelanjutan I Waskita Beton                         Beton Precast Sustainable Bonds I
              Precast Tahap I Tahun 2019 tersebut                            Phase I Year 2019 will be subjected to
              akan tunduk dan terikat dengan                                 and bound by the RUPO decision on
              keputusan RUPO tanggal 22 Maret                                March 22, 2022.
              2022.

           e. Sehubungan      dengan      adanya                       e.    In connection with the appointment of
              penunjukkan   Tim     Kecil   Wakil                            the Small Team of Bondholder
              Pemegang Obligasi sesuai Keputusan                             Representatives in accordance with the
              RUPO tanggal 22 Maret 2022 sesuai                              RUPO decision dated March 22, 2022
              keputusan RUPO No III, maka dengan                             in accordance with the RUPO Decision
              ini  seluruh  Pemegang      Obligasi                           No. III, all Bondholders hereby
              menyatakan       secara       tegas                            expressly declare to release the Small
                                                         16
Page 20
                                                                             The original financial statements included herein are in
                                                                                                           the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                  PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                          NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                             30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                               (UNAUDITED)

                membebaskan       Tim    Kecil   Wakil                           Team of Bondholder Representatives
                Pemegang Obligasi dari setiap klaim,                             from any claims, demands and/or civil
                tuntutan,       dan/atau       gugatan                           and/or criminal lawsuits from any party
                perdatamaupun pidana dari pihak                                  including but not limited to the
                manapun termasuk namun tidak                                     implementation of RUPO Decision No.
                terbatas      sehubungan       dengan                            III, therefore the Bondholders ratify and
                pelaksanaan Keputusan RUPO No III,                               accept unconditionally every action of
                oleh karenanya para Pemegang                                     the      Small      Team    Bondholder
                Obligasi meratifikasi dan menerima                               Representative as the action of the
                tanpa syarat atas setiap Tindakan Tim                            Bondholders themselves.
                Kecil Wakil Pemegang Obligasi sebagai
                Tindakan para Pemegang Obligasi itu
                sendiri.

           f.   Sehubungan dengan adanya proses                         f.       In connection with the PKPU process
                PKPU terhadap Perusahaan, para                                   against the Company, the Bondholders
                Pemegang Obligasi memberikan kuasa                               give power of attorney to PT Bank
                kepada PT Bank Mega Tbk selaku Wali                              Mega Tbk as the Trustee, to take all
                Amanat, untuk melakukan segala                                   necessary actions to represent the
                Tindakan yang diperlukan untuk                                   interests of the Bondholders, in
                mewakili    kepentingan   Pemegang                               accordance with RUPO No. III,
                Obligasi, sesuai Keputusan RUPO                                  including but not limited to:
                No. III, termasuk dan tidak terbatas
                untuk:

                •    Mengikuti rapat pemungutan                                  •      Participating in voting meetings,
                     suara antara lain mengeluarkan                                     including issuing and voting to
                     dan memberikan suara untuk                                         approve or disapprove the PKPU
                     menyetujui atau tidak menyetujui                                   time extension (if any) and/or
                     atas perpanjangan waktu PKPU                                       issuing and voting to approve or
                     (apabila      ada)      dan/atau                                   disapprove      of   the  peace
                     mengeluarkan dan memberikan                                        plan/proposal based on the
                     suara menyetujui atau tidak                                        decision of the Small Team of
                     menyetujui atas rencana/proposal                                   Bondholder Representatives that
                     perdamaian           berdasarkan                                   has been submitted in writing to
                     keputusan Tim Kecil Wakil                                          PT Bank Mega Tbk as the
                     Pemegang Obligasi yang telah                                       Trustee;
                     disampaikan     secara    tertulis
                     kepada PT Bank Mega Tbk selaku
                     Wali Amanat;
                •    Menandatangani         Perjanjian                           •      Signing       the       Settlement
                     Perdamaian        dalam       hal                                  Agreement in the event that the
                     rencana/proposal disetujui oleh                                    plan/proposal is approved by the
                     para Kreditur Perusahaan;                                          Company's Creditors;
                •    Melakukan perubahan dan/atau                                •      Make changes and/or additions to
                     penambahan terhadap Perjanjian                                     the Trusteeship Agreement for
                     Perwaliamanatan          Obligasi                                  Waskita Beton Precast Phase I
                     Berkelanjutan I Waskita Beton                                      Year 2019 Sustainable Bonds I,
                     Precast Tahap I Tahun 2019, Akta                                   Deed No. 37 dated April 15, 2019,
                     No 37 tanggal 15 April 2019,                                       agreements relating to the
                     berkaitan    dengan    Perjanjian                                  Trusteeship      Agreement        of
                     Perwaliamanatan          Obligasi                                  Waskita Beton Precast I Year
                     Berkelanjutan I Waskita Beton                                      2019 Sustainable Bonds, in the
                     Precast Tahap I Tahun 2019,                                        case of ratification of the peace
                     dalam hal disahkannya perjanjian                                   agreement        between        the
                     perdamaian antara Perusahaan                                       Company and the creditors by the
                     dan para kreditur oleh Majelis                                     Panel of Judges of the
                     Hakim      Pengadilan      Niaga                                   Commercial                    Court
                     (Homologasi).                                                      (Homologation).

           Oleh karena nya para pemegang Obligasi                       Therefore, the Bondholders ratify and
           meratifikasi dan menerima tanpa syarat                       unconditionally accept every action of the

                                                          17
Page 21
                                                                                The original financial statements included herein are in
                                                                                                              the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                    PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                            NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                  JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                               30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                  ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                 (UNAUDITED)

               setiap tindakan Wali Amanat sebagai                         Trustee as the action of the Bondholders
               tindakan para Pemegang Obligasi itu                         themselves, for this reason, the Bondholders
               sendiri, untuk itu para Pemegang Obligasi                   hereby expressly declare to release PT Bank
               dengan ini menyatakan secara tegas                          Mega Tbk as the Trustee from any claims,
               membebaskan PT Bank Mega Tbk selaku                         demands and/or civil and criminal lawsuits
               Wali Amanat dari setiap klaim, tuntutan                     from any party including but not limited to the
               dan/atau gugatan perdata maupun pidana                      implementation of this RUPO No. VI
               dari pihak manapun termasuk namun tidak                     Decision.
               terbatas sehubungan dengan pelaksanaan
               Keputusan RUPO No. VI ini.

       II. Rapat       Umum      Pemegang      Obligasi              II.   The General Meeting of Sustainable Bond
           Berkelanjutan I Tahap II Tahun 2019 sesuai                      Holders I Phase II Year 2019 in accordance
           Cover Note No. 52/NOT/SK/PT WBP-RUPO                            with Cover Note No. 52/NOT/SK/PT WBP-
           2/III/2022 tanggal 22 Maret 2022 dari Notaris                   RUPO 2/III/2022 dated March 22, 2022 of
           Dewantari      Handayani,    S.H.,    M.P.A.                    Notary Dewantari Handayani, S.H., M.P.A.
           ditetapkan:                                                     sets the following:

          a.      Sehubungan     dengan    penjelasan                      a.       In connection with the explanation by
                  Perusahaan (Dalam PKPU) selaku                                    the Company (In PKPU) as the Issuer
                  Emiten    pada    RUPO      tanggal                               at the GMS on March 22, 2022 that has
                  22   Maret   2022     yang   belum                                not    submitted    a    draft  peace
                  menyampaikan draf rencana/proposal                                plan/proposal,     the     bondholders
                  perdamaian, maka pemegang obligasi                                requested the following:
                  meminta:

                  •   Perusahaan segera menyusun dan                                •    The      Company        immediately
                      menyampaikan rencana/ proposal                                     prepares and submits a peace plan/
                      perdamaian.                                                        proposal.
                  •   Di dalam penyusunan rencana/                                  •    In preparing the reconciliation
                      proposal perdamaian, perusahaan                                    plan/proposal, the company as the
                      selaku Emiten untuk mengusulkan                                    Issuer is to propose provisions
                      ketentuan mengenai penyelesaian                                    regarding    the    settlement     of
                      kewajiban yang tidak merugikan                                     obligations that do not harm the
                      pemegang obligasi dan mengacu                                      bondholders and refers to the
                      kepada ketentuan antara lain dalam                                 provisions, among others, in Article
                      pasal 5 Perjanjian Perwaliamanatan                                 5 of the Trusteeship Agreement of
                      Obligasi Berkelanjutan I Waskita                                   Waskita Beton Precast Phase II
                      Beton Precast Tahap II tahun 2019,                                 2019 Sustainable Bonds, Deed
                      Akta No 47 tanggal 8 Oktober 2019,                                 No. 47 dated October 8, 2019,
                      yang dibuat di hadapan Jose Dima                                   which was made in the presence of
                      Satria SH.M. Kn, notaris di Jakarta                                Jose Dima Satria SH.M.Kn, Notary
                      Selatan      berikut    perubahan-                                 in    South    Jakarta    and     its
                      perubahannya.                                                      amendments.

          b.      Para pemegang Obligasi mewajibkan                        b.       Bondholders require the Company (In
                  kepada Perusahaan (Dalam PKPU)                                    PKPU) as the Issuer to provide a peace
                  selaku Emiten untuk memberikan                                    plan/proposal for approval to all
                  rencana/proposal perdamaian yang                                  Bondholders accompanied by a letter
                  akan dimintakan persetujuan kepada                                of introduction to PT Bank Mega Tbk as
                  seluruh Pemegang Obligasi dengan                                  the Trustee no later than 7 working
                  disertai surat pengantar kepada                                   days prior to the Discussion Meeting.
                  PT Bank Mega Tbk selaku wali Amanat                               Peace Plan/Proposal and/or Peace
                  selambat-lambatnya 7 hari kerja                                   Plan/Proposal Voting Meeting.
                  sebelum      Rapat     Pembahasan
                  Rencana/Proposal        Perdamaian
                  dan/atau Rapat Voting/Pemungutan
                  Suara Rencana/Proposal Perdamaian.

          c.      Menyetujui penunjukan/pembentukan                        c.       Approved       the     appointment/
                  Tim Kecil sebagai wakil para                                      establishment of the Small Team as


                                                            18
Page 22
                                                                           The original financial statements included herein are in
                                                                                                         the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                 PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                         NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022               JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                            30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                               ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                              (UNAUDITED)

               Pemegang Obligasi, yang anggotanya                              representatives of the Bondholders,
               terdiri dari:                                                   whose members consist of:

               •   PT Bahana TCW Investment                                    •    PT Bahana TCW Investment
                   Management                                                       Management
               •   PT BNI Aset Management                                      •    PT BNI Asset Management
               •   PT     Danareksa       Investment                           •    PT      Danareksa       Investment
                   Management                                                       Management
               •   PT Jasa Capital Asset Management                            •    PT      Jasa      Capital    Asset
                                                                                    Management
               •   PT Insight Investment Management                            •    PT Insight Investment Management
               •   PT Sucorinvest Asset Management                             •    PT Sucorinvest Asset Management
               •   PT Trimegah Aset Management                                 •    PT Trimegah Asset Management

          Selanjutnya sebagai Tim Kecil Wakil                          Furthermore,       as      the    Bondholder
          Pemegang Obligasi dam para Pemegang                          Representative Small Team and the
          Obligasi dengan ini memberikan kuasa                         Bondholders      hereby       authorize  the
          kepada Tim Kecil Wakil Pemegang Obligasi                     Bondholder Representative Small Team to
          untuk melakukan Tindakan-tindakan yang                       take the necessary actions for the benefit of
          diperlukan untuk kepentingan Pemegang                        the Bondholders in connection with the
          Obligasi sehubungan dengan proses PKPU                       PKPU process against the Company,
          terhadap Perusahaan, termasuk namun tidak                    including but not limited to:
          terbatas untuk:
          •     Bersama-sama         dengan     pihak                  •     Together with PT Bank Mega Tbk as the
                PT Bank Mega Tbk selaku Wali                                 Trustee, to attend every creditor meeting,
                Amanat,        untuk      menghadirin                        discuss/ propose the peace plans/
                setiap rapat kreditur, membahas/                             cproposals submitted by the Company,
                mengusulkan atas rencana/ proposal                           attend voting meetings on the peace
                perdamaian yang diajukan oleh                                plans/proposals submitted by the
                Perusahaan,       mengikuti     rapat                        Company
                pemungutan suara (voting) atas
                rencana/proposal perdamaian yang
                diajukan oleh Perusahaan
          •     Mengambil        Keputusan      untuk                  •     Make decisions to approve or disagree
                menyetujui atau tidak menyetujui atas                        with the PKPU time extension (if any)
                perpanjangan waktu PKPU (apabila                             and/or make decisions to approve or
                ada) dan/atau mngambil keputusan                             disapprove of the peace plan/ proposal
                untuk menyetujui atau tidak menyetujui                       submitted by the Company
                atas rencana/ proposal perdamaian
                yang diajukan oleh Perusahaan

          d.   Apabila Obligasi Berkelanjutan I                        d.      If the Waskita Beton Precast I Phase II
               Waskita Beton Precast Tahap II Tahun                            Year 2019 Sustainable Bonds are
               2019 dialihkan kepada pihak lain                                transferred to another party after the
               setelah RUPO tanggal 22 Maret 2022,                             RUPO on March 22, 2022, then the
               maka pihak yang menerima Pengalihan                             party receiving the Transfer of Waskita
               Obligasi Berkelanjutan I Waskita Beton                          Beton Precast Sustainable Bonds I
               Precast Tahap II Tahun 2019 tersebut                            Phase II Year 2019 will be subjected to
               akan tunduk dan terikat dengan                                  and bound by the RUPO decision on
               keputusan RUPO tanggal 22 Maret                                 March 22, 2022.
               2022.

          e.   Sehubungan        dengan      adanya                    e.      In connection with the appointment of
               penunjukkan     Tim    Kecil    Wakil                           the Small Team of Bondholder
               Pemegang Obligasi sesuai Keputusan                              Representatives in accordance with the
               RUPO tanggal 22 Maret 2022 sesuai                               RUPO           decision          dated
               Keputusan RUPO No III, maka dengan                              March 22, 2022 in accordance with the
               ini   seluruh  Pemegang       Obligasi                          RUPO Decision No. III, all Bondholders
               menyatakan         secara       tegas                           hereby expressly declare to release the
               membebaskan      Tim    Kecil   Wakil                           Small    Team       of      Bondholder
               Pemegang Obligasi dari setiap klaim,                            Representatives from any claims,
               tuntutan, dan/atau gugatan perdata                              demands and/or civil and/or criminal
                                                         19
Page 23
                                                                             The original financial statements included herein are in
                                                                                                           the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                  PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                          NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                             30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                               (UNAUDITED)

               maupun pidana dari pihak manapun                                  lawsuits from any party including but
               termasuk      namun    tidak terbatas                             not limited to the implementation of
               sehubungan dengan pelaksanaan                                     RUPO Decision No. III, therefore the
               Keputusan RUPO No. III, oleh                                      Bondholders     ratify and     accept
               karenanya para Pemegang Obligasi                                  unconditionally every action of the
               meratifikasi dan menerima tanpa syarat                            Small    Team     of      Bondholder
               atas setiap tindakan Tim Kecil Wakil                              Representatives as the action of the
               Pemegang Obligasi sebagai tindakan                                Bondholders themselves.
               para Pemegang Obligasi itu sendiri.

          f.   Sehubungan dengan adanya proses                          f.       In connection with the PKPU process
               PKPU terhadap Perusahaan, para                                    against the Company, the Bondholders
               Pemegang Obligasi memberikan kuasa                                give power of attorney to PT Bank
               kepada PT Bank Mega Tbk selaku Wali                               Mega Tbk as the Trustee, to take all
               Amanat Obligasi, untuk melakukan                                  necessary actions to represent the
               segala tindakan yang diperlukan untuk                             interests of the Bondholders, in
               mewakili     kepentingan     Pemegang                             accordance with RUPO No III,
               Obligasi, antara lain sesuai Keputusan                            including but not limited to:
               RUPO No. III, termasuk dan tidak
               terbatas untuk:
               •    Mengikuti rapat pemungutan                                   •    Participating in voting meetings,
                    suara antara lain mengeluarkan                                    including issuing and voting to
                    dan memberikan suara untuk                                        approve or disapprove the PKPU
                    menyetujui atau tidak menyetujui                                  time extension (if any) and/or
                    atas perpanjangan waktu PKPU                                      issuing and voting to approve or
                    (apabila       ada)       dan/atau                                disapprove the peace plan/
                    mengeluarkan dan memberikan                                       proposal based on the decision of
                    suara menyetujui atau tidak                                       the Small Team of Bondholder
                    menyetujui atas rencana/proposal                                  Representatives that has been
                    perdamaian berdasarkan putusan                                    submitted      in    writing   to
                    Tim Kecil Wakil Pemegang                                          PT Bank Mega Tbk as the Trustee;
                    Obligasi yang telah disampaikan
                    secara tertulis kepada PT Bank
                    Mega Tbk selaku Wali Amanat;
               •    Menandatangani           Perjanjian                          •    Signing the Settlement Agreement
                    Perdamaian          dalam       hal                               in the event that the plan/proposal
                    rencana/proposal disetujui oleh                                   is approved by the Company's
                    para Kreditur Perusahaan;                                         Creditors;
               •    Melakukan perubahan dan/atau                                 •    Make changes and/or additions to
                    penambahan terhadap Perjanjian                                    the Trusteeship Agreement for
                    Perwaliamanatan            Obligasi                               Waskita Beton Precast Phase II
                    Berkelanjutan I Waskita Beton                                     Year 2019 Sustainable Bonds I,
                    Precast Tahap II Tahun 2019,                                      Deed         No.       47      dated
                    Akta No 47 tanggal 8 Oktober                                      October 8, 2019, drawn up before
                    2019, yang dibuat dihadapan Jose                                  Jose Dima Satria, SH.M.Kn.,
                    Dima Satria, SH., M.Kn., Notaris                                  Notary in South Jakarta, along with
                    di Jakarta Selatan, berikut                                       the     amendments       and other
                    perubahan-perubahannya         dan                                agreements relating to the Said
                    perjanjian-perjanjian lain yang                                   Agreement of Waskita Beton
                    berkaitan     dengan     Perjanjian                               Precast I Phase II Year 2019
                    Perwaliamanatan            Obligasi                               Sustainable Bonds, in the case of
                    Berkelanjutan I Waskita Beton                                     ratification of the peace agreement
                    Precast Tahap II Tahun 2019,                                      between the Company and the
                    dalam hal disahkannya perjanjian                                  creditors by the Panel of Judges of
                    perdamaian antara Perusahaan                                      the         Commercial         Court
                    dan kreditur oleh Majelis Hakim                                   (Homologation)
                    Pengadilan Niaga (Homologasi).

          Oleh karena nya para Pemegang Obligasi                        Therefore, the Bondholders ratify and
          meratifikasi dan menerima tanpa syarat                        unconditionally accept every action of the
          setiap tindakan Wali Amanat sebagai                           Trustee as the action of the Bondholders
          tindakan para Pemegang Obligasi itu sendiri,                  themselves, for this reason, the Bondholders
                                                          20
Page 24
                                                                          The original financial statements included herein are in
                                                                                                        the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                 PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                         NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022               JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                            30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                               ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                              (UNAUDITED)

          untuk itu para Pemegang Obligasi dengan ini                   hereby expressly declare to release PT Bank
          menyatakan secara tegas membebaskan PT                        Mega Tbk as the Trustee from any claims,
          Bank Mega Tbk selaku Wali Amanat dari                         demands and/ or lawsuits. Prime or criminal
          setiap klaim, tuntutan dan/ atau gugatan                      from any party including but not limited to the
          perdana maupun pidana dari pihak manapun                      implementation of this RUPO No. VI
          termasuk namun tidak terbatas sehubungan                      Decision.
          dengan pelaksanaan Keputusan RUPO No.
          VI ini.

          Berdasarkan Perjanjian Perdamaian yang                        Based on the Reconciliation Agreement
          ditetapkan dalam Surat Pengadilan Negeri                      stipulated in the Special Class IA Central
          Jakarta     Pusat    Kelas     IA    Khusus                   Jakarta         District      Court       No.
          No W10.U1.2868.Ht.03.VI.2022.RIN tanggal                      W10.U1.2868.Ht.03.VI. 2022.RIN dated
          30 Juni 2022 perihal Pemberitahuan dan                        June 30, 2022 regarding Notification and
          Penyampaian Salinan Penetapan Perkara                         Submission of Copies of Commercial Case
          Niaga      No      497/Pdt.Sus/PKPU/2021/                     Determination      No.     497/Pdt.Sus/PKPU
          PN.Niaga.Jkt.Pst, telah ditetapkan ketentuan                  /2021/PN. Niaga.Jkt.Pst, special provisions
          khusus restrukturisasi untuk pemegang                         for restructuring have been set for
          obligasi, dimana jumlah utang Kreditur                        bondholders, whereby the total debt to the
          Pemegang Obligasi yang akan dibayarkan                        Bondholder Creditors will be paid through
          melalui golongan Tranche B adalah sebesar                     the Tranche B class, which is 15% of the total
          15% dari total porsi utang Kreditur                           portion of the debts to the Bondholder
          Pemegang Obligasi (“Utang Tranche B                           Creditors ("Tranche B debts to the
          Kreditur Pemegang Obligasi”), Kewajiban                       Bondholder Creditors"), the settlement of the
          dari Perseroan atas penyelesaian atas Utang                   Tranche B Debt to the Bondholders
          Tranche B Kreditur Pemegang Obligasi akan                     Creditors will be made on the 5th year from
          dilakukan pada tahun ke-5 sejak tanggal                       the Effective Date and will be settled by the
          Berlaku dan akan diselesaikan oleh                            Company on the 6th year from the Effective
          Perseroan pada tahun ke-6 sejak tanggal                       Date which will be sourced from Cash Flow
          berlaku yang akan bersumber dari Cash Flow                    Available for Debt Services (CFADS).
          Available for Debt Services (CFADS). Atas                     Tranche B Debt to Bondholders will bear an
          Utang Tranche B Kreditur Pemegang                             interest of 2% per annum during the
          Obligasi akan diberikan bunga sebesar 2%                      implementation of this Reconciliation
          per-tahun selama pelaksanaan Perjanjian                       Agreement which will be paid in accordance
          Perdamaian ini yang akan dibayarkan sesuai                    with CFADS and the remaining portion of the
          dengan CFADS dan sisa total utang akan                        total debt will be settled through Tranche C
          diselesaikan melalui Tranche C (Catatan 43).                  (Note 43).

   Perubahan III Perjanjian Perwaliamanatan                     Amendment III to Waskita Beton Precast Phase I
   Obligasi Berkelanjutan I Waskita Beton Precast               2019 Sustainable Bond Trusteeship Agreement
   Tahap I Tahun 2019

   Berdasarkan Akta Notaris No 11 tanggal 9 Maret               Based on Notarial Deed No. 11 dated March 9 2023,
   2023, dari Notaris Dewantari Handayani, SH, MPA,             from Notary Dewantari Handayani, SH, MPA, wherein
   dimana dalam pengaturan dan penyesuaian                      the arrangements and adjustments to the Trustee
   Perjanjian Perwaliamanatan tersebut menyesuaikan             Agreement conform to the Amicable Agreement
   dengan Perjanjian Perdamaian yang telah disahkan             which has been ratified (homologation) based on the
   (homologasi) berdasarkan Putusan Pengadilan                  Commercial Court Decision at the Central Jakarta
   Niaga pada Pengadilan Negeri Jakarta Pusat No.               District     Court       No.    497/Pdt.      Sus-
   497/Pdt.Sus-PKPU/2021/PN.NIAGA.JKT.          PST             PKPU/2021/PN.NIAGA.JKT. PST dated June 28,
   tanggal 28 Juni 2022 sebagai berikut:                        2022 as follows:

  1. Ketentuan mengenai Obligasi Berkelanjutan I                1. Provisions regarding Waskita Beton Precast Phase
     Waskita Beton Precast Tahap I Tahun 2019 yang                  I Year 2019 Sustainable Bonds I listed in the
     tercantum di dalam Perjanjian Perdamaian yang                  Settlement Agreement which will be adjusted in
     akan        disesuaikan     dalam   Perjanjian                 the Trustee ship Agreement, are as follows:
     Perwaliamanatan, sebagi berikut:
     a. Total kewajiban Emiten kepada Pemegang                     a. The total liabilities of the Issuer to the Holders
          Obligasi Berkelanjutan I Waskita Beton                       of Waskita Beton Precast Phase I 2019
          Precast Tahap I Tahun 2019 yang                              Sustainable Bonds I which were restructured
          direstrukturisasi  berdasarkan Perjanjian                    based on the Amicable Settlement Agreement
          Perdamaian adalah sebagaimana tercantum                      are as stated in the list of fixed receivables that
                                                                       have been issued by the Management Team
                                                         21
Page 25
                                                                            The original financial statements included herein are in
                                                                                                          the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                   PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                           NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                 JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                              30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                 ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                (UNAUDITED)

          dalam daftar piutang tetap yang telah                          in the PKPU process of the Company, which is
          diterbitkan oleh Tim Pengurus dalam proses                     Rp502,763,888,889
          PKPU       Perusahaan,        yaitu    sebesar
          Rp502.763.888.889.
     b.    Sumber Pelunasan Utang kepada seluruh                     b. Sources of Debt Repayment to all Issuer
          kreditur Emiten antara lain kreditur Pemegang                 creditors include Bondholders of Cash Flow
          Obligasi Cash Flow Available for Debt                         Available for Debt Services, Sale of Issuer
          Services, Penjualan aset-aset Emiten,                         assets, Conversion of creditors' debts into
          Konversi utang kreditur menjadi Mandatory                     Mandatory Convertible Bonds.
          Convertible Bond.
     c.   Penunjukan Agen Pemantau Independen                        c. Appointment of Independent Monitoring Agent
     d.   Ketentuan Restrukturisasi Obligasi                         d. Bond Restructuring Provisions
     e.   Penjualan Aset-Aset Emiten                                 e. Sale of Issuer's Assets
     f.   Ketentuan Umum Restrukturisasi                             f. General Provisions for Restructuring
     g.   Keadaan Kahar                                              g. Force Majeure
     h.    Emiten akan melakukan upaya terbaiknya                    h. Issuers will make their best efforts to obtain
          untuk mendapatkan dana-dana untuk dapat                        funds to be able to maintain the availability of
          menjaga ketersediaan CFADS yang nantinya                       CFADS which will later be used in making
          akan      digunakan      dalam       melakukan                 payments to all creditors.
          pembayaran kepada seluruh kreditur

  2. Untuk pengaturan lebih lanjut mengenai 2 (dua)               2. For further arrangements regarding 2 (two)
     golongan Obligasi hasil restrukturisasi, maka:                  classes of restructured Bonds, then:
     a. Untuk     golongan     tranche    B     sebesar              a. For tranche class B, it is Rp75,414,583,333 or
        Rp75.414.583.333 atau 15% dari total                             15% of the Issuer's total liabilities to the
        kewajiban Emiten kepada Pemegang Obligasi                        Holders of the Phase I Waskita Beton Precast
        Berkelanjutan I Waskita Beton Precast Tahap I                    I 2019 Sustainable Bonds based on the
        Tahun      2019     berdasarkan       Perjanjian                 Settlement Agreement of Rp502,763,888,889
        Perdamaian sebesar Rp502.763.888.889                             which is based on the Decision of the General
        dimana berdasarkan Keputusan Rapat Umum                          Meeting of Waskita Sustainable Bonds I
        Pemegang Obligasi Berkelanjutan I Waskita                        Bondholders Precast Concrete Phase I Year
        Beton Precast Tahap I Tahun 2019 tertanggal                      2019 dated February 15, 2023, has been
        15 Februari 2023, telah disetujui untuk diubah                   approved to be changed and/or added to
        dan/atau     ditambah      menjadi      sebesar                  Rp80,755,540,000 or 15% of the Issuer's total
        Rp80.755.540.000 atau 15% dari total                             liabilities to the Holders of Sustainable Bonds
        kewajiban Emiten kepada Pemegang Obligasi                        I Waskita Precast Phase I Year 2019 of
        Berkelanjutan I Waskita Beton Precast Tahap I                    Rp538,370,266,667, which will be regulated in
        Tahun 2019 sebesar Rp538.370.266.667,                            a separate trustee ship agreement named the
        akan diatur dalam perjanjian perwaliamanatan                     2022 Waskita Beton Precast I Bond Trustee
        tersendiri yang diberi nama Perjanjian                           ship Agreement.
        Perwaliamanatan Obligasi Waskita Beton
        Precast I Tahun 2022.
     b. Untuk     golongan     tranche    C     sebesar              b. For tranche class C, it is Rp427,349,305,555
        Rp427.349.305.555 atau 85% dari total                           or 85% of the Issuer’s total liabilities to the
        kewajiban Emiten kepada Pemegang Obligasi                       Holders of the 2019 Phase I Waskita Beton
        Berkelanjutan I Waskita Beton Precast Tahap I                   Precast I Sustainable Bonds based on the
        Tahun      2019     berdasarkan       Perjanjian                Settlement Agreement of Rp502,763,888,889,
        Perdamaian sebesar Rp502.763.888.889,                           which is based on the Decision of the General
        dimana berdasarkan Keputusan Rapat Umum                         Meeting of Waskita Beton Sustainable Bonds
        Pemegang Obligasi Berkelanjutan I Waskita                       I Bondholders Precast Phase I of 2019 dated
        Beton Precast Tahap I Tahun 2019 tertanggal                     February 15, 2023, has been approved to be
        15 Februari 2023, telah disetujui untuk diubah                  amended and/or added to Rp457,614,726,667
        dan/atau     ditambah      menjadi      sebesar                 or 85% of the Issuer's total liabilities to Holders
        Rp457.614.726.667 atau 85% dari total                           of Sustainable Bonds I Waskita Beton Precast
        kewajiban Emiten kepada Pemegang Obligasi                       Phase I Year 2019 of Rp538.370,266,667 will
        Berkelanjutan I Waskita Beton Precast Tahap I                   be regulated in a separate trusteeship
        Tahun 2019 sebesar Rp538.370.266.667 akan                       agreement named the Trusteeship Agreement
        diatur dalam perjanjian perwaliamanatan                         of Waskita Beton Precast I Compulsory
        tersendiri yang diberi nama Perjanjian                          Convertible Bonds I Year 2023.
        Perwaliamanatan Obligasi Wajib Konversi
        Waskita Beton Precast I Tahun 2023.


                                                           22
Page 26
                                                                               The original financial statements included herein are in
                                                                                                             the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                     PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                             NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                   JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                   ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                  (UNAUDITED)

   Perubahan     II  Perjanjian  Perwaliamanatan                    Amendment II to Waskita Beton Precast Phase II
   Obligasi Berkelanjutan I Waskita Beton Precast                   2019 Sustainable Bond Trusteeship Agreement
   Tahap II Tahun 2019

   Berdasarkan Akta Notaris No 12 tanggal 9 Maret                   Based on Notarial Deed No. 12 dated March 9 2023,
   2023, dari Notaris Dewantari Handayani, SH, MPA,                 from Notary Dewantari Handayani, SH, MPA, wherein
   dimana dalam pengaturan dan penyesuaian                          the arrangements and adjustments to the Trustee
   Perjanjian Perwaliamanatan tersebut menyesuaikan                 Agreement conform to the Amicable Agreement
   dengan Perjanjian Perdamaian yang telah disahkan                 which has been ratified (homologation) based on the
   (homologasi) berdasarkan Putusan Pengadilan                      Commercial Court Decision at the Central Jakarta
   Niaga pada Pengadilan Negeri Jakarta Pusat No.                   District      Court         No.        497/Pdt.Sus-
   497/Pdt.Sus-PKPU/2021/PN.NIAGA.JKT.PST                           PKPU/2021/PN.NIAGA.JKT.PST dated June 28,
   tanggal 28 Juni 2022 sebagai berikut:                            2022 as follows:
  1. Ketentuan mengenai Obligasi Berkelanjutan I                    1. Provisions regarding Waskita Beton Precast
      Waskita Beton Precast Tahap II Tahun 2019 yang                   Phase II Year 2019 Sustainable Bonds listed in
      tercantum di dalam Perjanjian Perdamaian yang                    the Settlement Agreement which will be adjusted
      akan        disesuaikan      dalam        Perjanjian             in the Trustee ship Agreement, are as follows:
      Perwaliamanatan, sebagi berikut:
      a. Total kewajiban Emiten kepada Pemegang                        a. The total liabilities of the Issuer to the Holders
          Obligasi Berkelanjutan I Waskita Beton                          of Waskita Beton Precast Phase II 2019
          Precast Tahap II Tahun 2019 yang                                Sustainable Bonds I which were restructured
          direstrukturisasi   berdasarkan       Perjanjian                based on the Amicable Settlement Agreement
          Perdamaian adalah sebagaimana tercantum                         are as stated in the list of fixed receivables that
          dalam daftar piutang tetap yang telah                           have been issued by the Management Team
          diterbitkan oleh Tim Pengurus dalam proses                      in the PKPU process of the Company, which is
          PKPU        Perusahaan,      yaitu     sebesar                  Rp1,534,531,250,000.
          Rp1.534.531.250.000.
      b. Sumber Pelunasan Utang kepada seluruh                         b. Sources of Debt Repayment to all Issuer
          kreditur Emiten antara lain kreditur Pemegang                   creditors include Bondholders of Cash Flow
          Obligasi Cash Flow Available for Debt                           Available for Debt Services, Sale of Issuer
          Services,     Penjualan aset-aset Emiten,                       assets, Conversion of creditors' debts into
          Konversi utang kreditur menjadi Mandatory                       Mandatory Convertible Bonds.
          Convertible Bond.
      c. Penunjukan Agen Pemantau Independen                           c.   Appointment of Independent Monitoring Agent
      d. Ketentuan Restrukturisasi Obligasi                            d.   Bond Restructuring Provisions
      e. Penjualan Aset-Aset Emiten                                    e.   Sale of Issuer's Assets
      f. Ketentuan Umum Restrukturisasi                                f.   General Provisions for Restructuring
      g. Keadaan Kahar                                                 g.   Force Majeure
      h. Emiten akan melakukan upaya terbaiknya untuk                  h.   Issuers will make their best efforts to obtain
          mendapatkan dana-dana untuk dapat menjaga                         funds to be able to maintain the availability of
          ketersediaan CFADS yang nantinya akan                             CFADS which will later be used in making
          digunakan dalam melakukan pembayaran                              payments to all creditors.
          kepada seluruh kreditur.
  2. Untuk pengaturan lebih lanjut mengenai 2 (dua)                 2. For further arrangements regarding 2 (two)
      golongan Obligasi hasil restrukturisasi, maka:                   classes of restructured Bonds, then:
      a. Untuk golongan tranche B sebesar                              a. For tranche class B, it is Rp230,179,687,500 or
          Rp230.179.687.500 atau 15% dari total                            15% of the Issuer's total liabilities to the
          kewajiban Emiten kepada Pemegang Obligasi                        Holders of the Phase I Waskita Beton Precast
          Berkelanjutan I Waskita Beton Precast Tahap                      II 2019 Sustainable Bonds based on the
          II Tahun 2019 berdasarkan Perjanjian                             Settlement Agreement of Rp502,763,888,889
          Perdamaian sebesar Rp502.763.888.889                             which is based on the Decision of the General
          dimana berdasarkan Keputusan Rapat Umum                          Meeting of Waskita Sustainable Bonds I
          Pemegang Obligasi Berkelanjutan I Waskita                        Bondholders Precast Concrete Phase II Year
          Beton Precast Tahap II Tahun 2019 tertanggal                     2019 dated February 15, 2023, has been
          15 Februari 2023, telah disetujui untuk diubah                   approved to be changed and/or added to
          dan/atau      ditambah     menjadi     sebesar                   Rp1,534,531,250,000 or 15% of the Issuer's
          Rp1.534.531.250.000 atau 15% dari total                          total liabilities to the Holders of Sustainable
          kewajiban Emiten kepada Pemegang Obligasi                        Bonds I Waskita Precast Phase II Year 2019
          Berkelanjutan I Waskita Beton Precast Tahap                      of Rp245,850,916,667, which will be regulated
          II Tahun 2019 sebesar Rp245.850.916.667,                         in a separate trustee ship agreement named
          akan diatur dalam perjanjian perwaliamanatan                     the 2022 Waskita Beton Precast I Bond
          tersendiri yang diberi nama Perjanjian                           Trustee ship Agreement.
                                                             23
Page 27
                                                                                   The original financial statements included herein are in
                                                                                                                 the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                     PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                             NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                   JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                   ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                  (UNAUDITED)

             Perwaliamanatan Obligasi Waskita Beton
             Precast I Tahun 2022.
          b. Untuk golongan tranche C sebesar                               b. For tranche class C, it is Rp1,304,351,562,500
             Rp1.304.351.562.500 atau 85% dari total                           or 85% of the Issuer’s total liabilities to the
             kewajiban Emiten kepada Pemegang Obligasi                         Holders of the 2019 Phase II Waskita Beton
             Berkelanjutan I Waskita Beton Precast Tahap                       Precast I Sustainable Bonds based on the
             II Tahun 2019 berdasarkan Perjanjian                              Settlement              Agreement             of
             Perdamaian sebesar Rp1.534.531.250.000,                           Rp1,534,531,250,000, which is based on the
             dimana berdasarkan Keputusan Rapat Umum                           Decision of the General Meeting of Waskita
             Pemegang Obligasi Berkelanjutan I Waskita                         Beton Sustainable Bonds I Bondholders
             Beton Precast Tahap II Tahun 2019 tertanggal                      Precast Phase II of 2019 dated February 15,
             15 Februari 2023, telah 28 disetujui untuk                        2023, has been approved to be amended
             diubah dan/atau ditambah menjadi sebesar                          and/or added to Rp1,393,155,194.444 or 85%
             Rp1.393.155.194.444 atau 85% dari total                           of the Issuer's total liabilities to Holders of
             kewajiban Emiten kepada Pemegang Obligasi                         Sustainable Bonds I Waskita Beton Precast
             Berkelanjutan I Waskita Beton Precast Tahap                       Phase II Year 2019 of Rp1,639,006,111,111
             II Tahun 2019 sebesar Rp1.639.006.111.111                         will be regulated in a separate trustee
             akan diatur dalam perjanjian perwaliamanatan                      agreement named the Trustee Agreement of
             tersendiri yang diberi nama Perjanjian                            Waskita Beton Precast I Compulsory
             Perwaliamanatan Obligasi Wajib Konversi                           Convertible Bonds II Year 2023
             Waskita Beton Precast II Tahun 2023.

2.   PENERAPAN     STANDAR        AKUNTANSI                       2.   ADOPTION OF NEW AND REVISED STATEMENTS
     KEUANGAN BARU DAN REVISI (PSAK)                                   OF FINANCIAL ACCOUNTING STANDARDS
                                                                       (PSAK)

     a.    Standar yang berlaku efektif pada tahun                     a.   Amendments to standards effective in the
           berjalan                                                         current year

           Dalam tahun berjalan, Perusahaan telah                            In the current year, the Company has applied a
           menerapkan standar dan sejumlah amendemen/                        number of amendments/ improvements to
           penyesuaian/interpretasi PSAK yang relevan                        PSAKs that are relevant to its operations and
           dengan operasinya dan efektif untuk periode                       effective for accounting period beginning on or
           akuntansi yang dimulai pada atau setelah                          after January 1, 2022. The adoption of these
           1 Januari 2022. Penerapan atas PSAK                               amendments/improvements to PSAKs does not
           baru/revisi tidak mengakibatkan perubahan atas                    result in changes to the Company’s accounting
           kebijakan akuntansi Perusahaan dan tidak                          policies and has no material effect on the
           memiliki dampak material terhadap jumlah yang                     amounts reported for the current or prior periods.
           dilaporkan pada tahun berjalan atau tahun-tahun
           sebelumnya.

           •   PSAK 73 (amendemen), “Sewa”: Konsensi                         •   PSAK 73 (amendment), “Leases”: Covid-19-
               sewa terkait Covid-19 setelah 30 Juni 2021                        related      lease     concession beyond
                                                                                 June 30, 2021
           •   PSAK 57 (amendemen), “Provisi, Liabilitas                     •   PSAK 57 (amendment), “Provisions,
               Kontinjensi dan Aset Kontinjensi” tentang                         Contingent Liabilities and Contingent
               Kontrak Memberatkan - Biaya Memenuhi                              Assets” Onerous Contracts - Cost of
               Kontrak                                                           Fulfilling the Contracts
           •   Penyesuaian Tahunan 2020 atas PSAK                            •   2020 Annual Improvements to PSAK
               (amendemen      PSAK   71,    “Instrumen                          (amendments to PSAK 71, “Financial
               Keuangan” dan PSAK 73, “Sewa”)                                    Instruments”, and PSAK 73, “Leases”)

     b.    Standar dan amendemen standar            telah              b.    Standard and amendments to standards
           diterbitkan tapi belum diterapkan                                 issued not yet adopted

           Pada tanggal persetujuan laporan keuangan,                        At the date of authorization of these financial
           amendemen-amendemen atas PSAK yang                                statements, the following amendments to PSAKs
           relevan bagi Perusahaan, yang telah diterbitkan                   relevant to the Company were issued but not
           namun belum berlaku efektif, dengan penerapan                     effective, with early application permitted:
           dini diizinkan, adalah sebagai berikut:

           Efektif untuk periode yang dimulai pada atau                      Effective for periods beginning on or after
           setelah tanggal 1 Januari 2023                                    January 1, 2023

                                                             24
Page 28
                                                                                  The original financial statements included herein are in
                                                                                                                the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                     PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                             NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                   JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                   ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                  (UNAUDITED)

          •   PSAK 1 (amendemen), Penyajian Laporan                         •   PSAK 1 (amendment), Presentation of
              Keuangan: Klasifikasi Liabilitas sebagai                          financial statements: Classification of
              Jangka Pendek atau Jangka Panjang                                 Liabilities as Current or Non-currrent
          •   PSAK 16 (amendemen), Aset Tetap: Hasil                        •   PSAK 16 (amendment), Property, Plant and
              Sebelum Penggunaan yang Diintensikan                              Equipment: Proceeds before Intended Use
          •   PSAK    25    (amendemen),       Kebijakan                    •   PSAK       25     (amendment), Accounting
              Akuntansi, Perubahan Estimasi Akuntansi,                          Policies, Changes in Accounting Estimates
              dan Kesalahan: Definisi Estimasi Akuntansi                        and Errors: Definition of Accounting
                                                                                Estimates
          •   PSAK 1 (amendemen), Penyajian Laporan                         •   PSAK 1 (amendment), Presentation of
              Keuangan:    Pengungkapan       Kebijakan                         Financial      Statements:    Disclosure    of
              Akuntansi                                                         Accounting Policies
          •   PSAK 46 (amendemen), Pajak Penghasilan:                       •   PSAK 46 (amendment), Income Taxes:
              Pajak Tangguhan Terkait Aset dan                                  Deffered Tax Related to Assets and
              Kewajiban yang Timbul dari Satu Transaksi.                        Liabilities Arising from a Single Transaction.

          Efektif untuk periode yang dimulai pada atau                      Effective for periods beginning on or after
          setelah tanggal 1 Januari 2024                                    January 1, 2024

          •   PSAK 1 (Amendemen), “Penyajian Laporan                        •   PSAK 1 (Amendment), “Presentation of
              Keuangan”: Liabilitas Jangka Panjang                              Financial       Statements”:    Non-current
              dengan Kovenan                                                    Liabilities with Covenants
          •   PSAK 73 (Amendemen), “Sewa”: Liabilitas                       •   PSAK 73 (Amendment), “Lease”: Lease
              Sewa dalam Jual dan Sewa Balik                                    Liability in a Sale and Leaseback

          Efektif untuk periode yang dimulai pada atau                      Effective for periods beginning on or after
          setelah tanggal 1 Januari 2025                                    January 1, 2025

          •   PSAK 74, “Kontrak Asuransi”                                   •   PSAK 74, “Insurance Contracts”

              PSAK 74 mengatur relaksasi beberapa                               PSAK 74 regulates the relaxation of several
              ketentuan antara lain berupa penambahan                           provisions, including the addition of scope
              pengecualian ruang lingkup, penyesuaian                           exceptions, adjustments to the presentation
              penyajian laporan keuangan, penerapan                             of financial statements, application of risk
              opsi mitigasi risiko dan beberapa modifikasi                      mitigation options and some modifications to
              pada ketentuan transisi. PSAK 74 juga                             transitional provisions. PSAK 74 also
              mensyaratkan pemisahan yang jelas antara                          requires a clear separation between income
              pendapatan yang dihasilkan dari bisnis                            generated from the insurance business and
              asuransi dengan yang berasal dari kegiatan                        from investment activities.
              investasi.

          Sampai dengan tanggal penerbitan laporan                          As at the issuance date of the financial
          keuangan, dampak dari penerapan amendemen                         statements, the effects of adopting these
          tersebut terhadap laporan keuangan tidak dapat                    amendments to PSAKs on the financial
          diketahui atau diestimasi oleh manajemen.                         statements is not known nor reasonably
                                                                            estimable by management.

3.   KEBIJAKAN AKUNTANSI YANG SIGNIFIKAN                          3.   SIGNIFICANT ACCOUNTING POLICIES

     a.   Pernyataan Kepatuhan                                         a.   Statement of Compliance
          Laporan keuangan Perusahaan disusun dan                           The financial statements of the Company have
          disajikan sesuai dengan Standar Akuntansi                         been prepared and presented in accordance with
          Keuangan di Indonesia dan Peraturan Otoritas                      Indonesian Financial Accounting Standards and
          Jasa Keuangan/ Badan Pengawas Pasar Modal                         regulations of Financial Services Authority/
          dan Lembaga Keuangan (OJK/Bapepam-LK)                             Capital Market and Supervisory Board and
          No.     VIII.G.7 tentang   Penyajian    dan                       Financial     Institution    (OJK/Bapepam-LK)
          Pengungkapan Laporan Keuangan Emiten atau                         No. VIII.G.7 regarding Presentation and
          Perusahaan Publik.                                                Disclosure of Financial Statements of the Issuer
                                                                            or Public Company.




                                                             25
Page 29
                                                                                      The original financial statements included herein are in
                                                                                                                    the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                          PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                                  NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                        JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                     30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                        ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                       (UNAUDITED)

   b.   Dasar Penyusunan                                                   b.   Basis of Preparation

        Dasar penyusunan laporan keuangan ini adalah                            The financial statements have been prepared on
        biaya historis, kecuali untuk aset tetap yang                           the historical cost basis except for property, plant
        diukur pada jumlah revaluasian, aset diklasifikasi                      and equipment which are carried at revalued
        dimiliki untuk dijual diukur pada nilai yang lebih                      amounts, assets available for sale which are
        rendah antara jumlah tercatat dan nilai wajar                           carried at the lower of its carrying amount and fair
        setelah dikurangi biaya untuk menjual dan                               value less costs to sell and inventories which are
        persediaan yang dinyatakan sebesar nilai yang                           carried at the lower of cost and net realizable
        lebih rendah antara harga perolehan dan nilai                           value. The financial statements are prepared
        realisasi bersih (the lower of cost or net realizable                   based on the accrual basis of accounting, except
        value). Laporan keuangan disusun berdasarkan                            for the statements of cash flows.
        asumsi       kelangsungan          usaha        serta
        menggunakan metode akrual kecuali untuk
        laporan arus kas.

        Laporan arus kas disusun dengan menggunakan                             The statement of cash flows is prepared using
        metode langsung dengan mengelompokkan arus                              the direct method by classifying cash flows into
        kas ke dalam aktivitas operasi, investasi dan                           operating, investing and financing activities.
        pendanaan.

        Perusahaan telah menyusun laporan keuangan                              The Company has prepared the financial
        dengan dasar bahwa Perusahaan akan terus                                statements on the basis that it will continue to
        mempertahankan kelangsungan usaha.                                      operate as a going concern.

   c. Transaksi Dalam Mata Uang Asing                                      c.   Foreign     Currency            Transactions            and
                                                                                Translation

        Laporan keuangan Perusahaan diukur dan                                  The financial statements of the Company are
        disajikan dalam mata uang dari lingkungan                               measured and presented in the currency of the
        ekonomi utama dimana entitas beroperasi (mata                           primary economic environment in which it
        uang     fungsional).   Laporan    keuangan                             operates (its functional currency). The financial
        Perusahaan disajikan dalam mata uang Rupiah                             statements of the Company are presented in
        yang merupakan mata uang fungsional.                                    Rupiah, which is its functional currency.

        Dalam penyusunan laporan keuangan, transaksi                            In    preparing    the    financial   statements,
        dalam mata uang asing selain mata uang                                  transactions in currencies other than its
        fungsional entitas (mata uang asing) diakui pada                        functional currency (foreign currencies) are
        kurs yang berlaku pada tanggal transaksi. Pada                          recognized at the rates of exchange prevailing at
        setiap akhir periode pelaporan, pos moneter                             the dates of the transactions. At the end of each
        dalam valuta asing dijabarkan kembali pada kurs                         reporting period, monetary items denominated in
        yang berlaku pada tanggal tersebut. Pos-pos                             foreign currencies are retranslated at the rates
        nonmoneter yang diukur pada nilai wajar dalam                           prevailing at that date. Non-monetary items
        valuta asing dijabarkan kembali pada kurs yang                          carried at fair value that are denominated in
        berlaku pada tanggal ketika nilai wajar                                 foreign currencies are retranslated at the rates
        ditentukan. Pos non-moneter yang diukur dalam                           prevailing at the date when the fair value was
        biaya historis dalam valuta asing tidak dijabarkan                      determined. Non-monetary items that are
        kembali.                                                                measured in terms of historical cost in a foreign
                                                                                currency are not retranslated.

        Pada akhir periode pelaporan, pos moneter                               At the end of reporting period, foreign currency
        dalam mata uang asing dijabarkan ke dalam                               denominated monetary items are translated to
        Rupiah menggunakan kurs penutup, yaitu kurs                             Rupiah using the closing rate, i.e middle rate of
        tengah BI pada 30 Juni 2023, 31 Desember 2022                           BI of June 30, 2023, December 31, 2022 and
        dan 30 Juni 2022 sebagai berikut:                                       June 30, 2022 as follows:

                                                30 Juni/             31 Desember/         30 Juni/
                                                June 30              December 31,         June 30
                                                 2023                    2022              2022
        Dollar Amerika Serikat                        15.026                15.731              14.848                            US Dollar



                                                                26
Page 30
                                                                                      The original financial statements included herein are in
                                                                                                                    the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                       PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                               NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                     JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                  30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                     ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                    (UNAUDITED)

        Selisih kurs diakui dalam laba rugi pada periode                   Exchange differences are recognized in profit or
        saat terjadinya.                                                   loss in the period in which they arise.

   d.   Transaksi dengan Pihak-pihak Berelasi                         d.   Transactions with Related Parties

        Pihak berelasi adalah orang atau entitas yang                      A related party is a person or entity that is related
        terkait dengan Perusahaan (entitas pelapor)                        to the Company (the reporting entity):

        a.   Orang atau anggota keluarga terdekat                          a.    A person or a close member of that person's
             mempunyai relasi dengan entitas pelapor                             family is related to the reporting entity if that
             jika orang tersebut:                                                person:

              i.    memiliki       pengendalian       atau                      i.       has control or joint control over the
                    pengendalian bersama entitas pelapor;                                reporting entity;
              ii.   memiliki pengaruh signifikan entitas                        ii.      has significant influence over the
                    pelapor; atau                                                        reporting entity; or
             iii.   merupakan personil manajemen kunci                          iii.     is a member of the key management
                    entitas pelapor atau entitas induk dari                              personnel of the reporting entity or of a
                    entitas pelapor.                                                     parent of the reporting entity.

        b.   Suatu entitas berelasi entitas pelapor jika                   b.    An entity is related to the reporting entity if
             memenuhi salah satu hal berikut:                                    any of the following conditions applies:

              i.   Entitas dan entitas pelapor adalah                            i.      The entity, and the reporting entity are
                   anggota dari kelompok usaha yang                                      members of the same group (which
                   sama (artinya entitas induk, entitas                                  means that each parent, subsidiary and
                   anak, dan entitas anak berikutnya                                     fellow subsidiary is related to the
                   terkait dengan entitas lain);                                         others);
               ii. Satu entitas adalah entitas asosiasi                          ii.     One entity is an associate or joint
                   atau ventura bersama dari entitas lain                                venture of the other entity (or an
                   (atau entitas asosiasi atau ventura                                   associate or joint venture of a member
                   bersama yang merupakan anggota                                        of a group of which the other entity is a
                   suatu kelompok usaha, yang mana                                       member);
                   entitas      lain     tersebut     adalah
                   anggotanya);
              iii. Kedua entitas tersebut adalah ventura                        iii.     Both entities are joint ventures of the
                   bersama dari pihak ketiga yang sama;                                  same third party;
             iv. Satu entitas adalah ventura bersama                            iv.      One entity is a joint venture of a third
                   dari entitas ketiga dan entitas yang lain                             entity and the other entity is an
                   adalah entitas asosiasi dari entitas                                  associate of the third entity;
                   ketiga;
              v. Entitas tersebut adalah suatu program                          v.       The entity is a post-employment benefit
                   imbalan pascakerja untuk imbalan kerja                                plan for the benefit of employees of
                   dari salah satu entitas pelapor atau                                  either the reporting entity, or an entity
                   entitas yang terkait dengan entitas                                   related to the reporting entity. If the
                   pelapor. Jika entitas pelapor adalah                                  reporting entity in itself such a plan, the
                   entitas     yang       menyelenggarakan                               sponsoring employers are also related
                   program tersebut, maka entitas sponsor                                to the reporting entity;
                   juga berelasi dengan entitas pelapor;
               vi. Entitas     yang     dikendalikan    atau                     vi. The entity is controlled or jointly
                   dikendalikan bersama oleh orang yang                              controlled by a person identified in (a);
                   diidentifikasi dalam huruf (a);
             vii. Orang yang diidentifikasi dalam huruf                         vii. A person identified in (a) (i) has
                   (a) (i) memiliki pengaruh signifikan atas                          significant influence over the entity or is
                   entitas atau merupakan personil                                    a member of the key management
                   manajemen kunci entitas (atau entitas                              personnel of the entity (or a parent of
                   induk dari entitas); atau                                          the entity); or
             viii. Entitas, atau anggota dari kelompok                          viii. The entity, or any member of a group of
                   yang mana entitas merupakan bagian                                 which it is a part, provides key
                   dari kelompok tersebut, menyediakan                                management personnel services to the
                   jasa personil manajemen kunci kepada                               reporting entity or to the parent of the
                                                                                      reporting entity.

                                                               27
Page 31
                                                                                  The original financial statements included herein are in
                                                                                                                the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                     PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                             NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                   JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                   ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                  (UNAUDITED)

                 entitas pelapor atau kepada entitas
                 induk dari entitas pelapor.

        Transaksi signifikan yang dilakukan dengan                       Significant transactions with related parties,
        pihak-pihak berelasi, baik dilakukan dengan                      whether or not made at similar terms and
        kondisi dan persyaratan yang sama dengan                         conditions as those done with third parties, are
        pihak ketiga maupun tidak, diungkapkan pada                      disclosed in the financial statements (Note 38).
        laporan keuangan (Catatan 38).

   e.   Instrumen Keuangan                                          e.   Financial Instruments

        Klasifikasi Aset Keuangan                                        Classification         of     Financial       Assets       and
                                                                         Liabilities

        Sesuai dengan PSAK 71, terdapat tiga klasifikasi                 In accordance with PSAK 71, there are three
        pengukuran aset keuangan:                                        measurement classifications for financial assets:
        i. Biaya perolehan diamortisasi;                                  i. Amortized cost;
        ii. Diukur pada nilai wajar melalui penghasilan                  ii. Fair value through other comprehensive
             komprehensif lain (FVOCI);                                       income (FVOCI);
        iii. Diukur pada nilai wajar melalui laba rugi                   iii. Fair value through profit or loss (FVTPL).
             (FVTPL).

        Aset keuangan diklasifikasikan menjadi kategori                  Financial assets are classified into these
        tersebut di atas berdasarkan model bisnis                        categories based on the business model within
        dimana aset keuangan tersebut dimiliki dan                       which they are held and their contractual cash
        karakteristik arus kas kontraktualnya. Model                     flow characteristics. The business model reflects
        bisnis merefleksikan bagaimana kelompok aset                     how a group of financial assets are managed to
        keuangan dikelola untuk mencapai tujuan bisnis                   achieve a particular business objective.
        tertentu.

        i.   Aset keuangan dapat diukur dengan biaya                     i.   A financial asset is measured at amortized
             perolehan     diamortisasi hanya     jika                        cost only if it meets both of the following
             memenuhi kedua kondisi berikut dan tidak                         conditions and it is not designated as at
             ditetapkan sebagai FVTPL:                                        FVTPL:

             -   Aset keuangan dikelola dalam model                           -      The financial assets is held within a
                 bisnis yang bertujuan untuk memiliki                                business model whose objective is to
                 aset      keuangan       untuk     tujuan                           hold the asset to collect contractual
                 mendapatkan arus kas kontraktual                                    cash flows (held to collect); and
                 (held to collect); dan
             -   Kriteria kontraktual dari aset keuangan                      -      Its contractual terms give rise on
                 yang       pada      tanggal     tertentu                           specified dates to cash flows that are
                 menghasilkan        arus    kas     yang                            Solely Payments of Principal and
                 merupakan pembayaran pokok dan                                      Interest (SPPI) on the principal amount
                 bunga semata (SPPI – Solely Payments                                outstanding.
                 of Principle and Interest) dari jumlah
                 pokok terutang.

        Aset keuangan Perusahaan terutama terdiri dari                   The Company’s financial assets mainly consist of
        kas dan setara kas, piutang usaha, piutang lain-                 cash and cash equivalents, accounts receivable,
        lain, dan tagihan bruto kepada pelanggan, dan                    other receivables, gross amounts due from
        aset lainnya – kas di bank yang dibatasi                         customers, and other assets – restricted cash in
        penggunaannya, yang diklasifikasikan sebagai                     banks, which are classified as financial assets
        aset keuangan yang diukur dengan biaya                           measured at amortized cost. The Company does
        perolehan diamortisasi. Perusahaan tidak                         not have financial assets measured at FVOCI
        memiliki aset keuangan yang diukur pada FVOCI                    and FVTPL.
        dan FVTPL.

        Klasifikasi  Liabilitas        Keuangan        dan               Financial Liabilities and Equity Instruments
        Instrumen Ekuitas

        Klasifikasi sebagai liabilitias atau ekuitas                     Classification as debt or equity

                                                             28
Page 32
                                                                           The original financial statements included herein are in
                                                                                                         the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                  PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                          NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                             30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                               (UNAUDITED)

       Instrumen utang dan ekuitas yang diterbitkan                  Debt and equity instruments issued by the
       oleh Perusahaan diklasifikasikan sebagai                      Company are classified as either financial
       liabilitas keuangan atau ekuitas sesuai dengan                liabilities or as equity in accordance with the
       substansi perjanjian kontraktual dan definisi                 substance of the contractual arrangements
       liabilitas keuangan dan instrumen ekuitas.                    entered into and the definitions of a financial
                                                                     liability and an equity instrument.

       Instrumen ekuitas                                             Equity instruments

       Instrumen ekuitas adalah setiap kontrak yang                  An equity instrument is any contract that
       memberikan hak residual atas aset Perusahaan                  evidences a residual interest in the assets of an
       setelah dikurangi dengan seluruh liabilitasnya.               entity after deducting all of its liabilities. Equity
       Instrumen ekuitas yang diterbitkan oleh                       instruments issued by the Company are recorded
       Perusahaan dicatat sebesar hasil penerimaan                   at the proceeds received, net of direct issue
       bersih setelah dikurangi biaya penerbitan                     costs.
       langsung.

       Pembelian       kembali    instrumen     ekuitas              Repurchase of the Company’s own equity
       Perusahaan (saham treasuri) diakui dan                        instruments (treasury shares) is recognized and
       dikurangkan secara langsung dari ekuitas.                     deducted directly in equity. No gain or loss is
       Keuntungan dan kerugian yang timbul dari                      recognized in profit or loss on the purchase, sale,
       pembelian,      penjualan,    penerbitan   atau               issue or cancellation of the Company’s own
       pembatalan instrumen ekuitas Perusahaan                       equity instruments.
       tersebut tidak diakui dalam laba rugi.

       Instrumen keuangan majemuk                                    Compound instruments

       Bagian     komponen      instrumen     keuangan               The component parts of compound instruments
       majemuk (obligasi konversi) yang diterbitkan                  (convertible notes) issued by the Company are
       oleh Perusahaan diklasifikasikan secara terpisah              classified separately as financial liabilities and
       sebagai liabilitas keuangan dan instrumen                     equity in accordance with the substance of the
       ekuitas sesuai dengan substansi perjanjian                    contractual arrangements and the definitions of a
       kontraktual dan definisi liailitas keuangan dan               financial liability and an equity instrument. A
       instrumen keuangan. Opsi konversi yang akan                   conversion option that will be settled by the
       diselesaikan dengan pertukaran sejumlah kas                   exchange of a fixed amount of cash or another
       atau aset keuangan lainnya untuk sejumlah                     financial asset for a fixed number of the
       instrumen ekuitas Perusahaan yang telah                       Company’s own equity instruments is an equity
       ditetapkan merupakan instrumen ekuitas.                       instrument.

       Pada tanggal penerbitan, nilai wajar komponen                 At the date of issue, the fair value of the liability
       liabilitas diestimasikan menggunakan suku                     component is estimated using the prevailing
       bunga pasar yang berlaku untuk instrumen non-                 market interest rate for similar non-convertible
       konversi serupa. Jumlah ini dicatat sebagai                   instruments. This amount is recorded as a liability
       liabilitas dengan dasar biaya diamortisasi                    on an amortized cost basis using the effective
       menggunakan metode suku bunga efektif                         interest method until extinguished upon
       sampai dihentikan pengakuannya pada saat                      conversion or at the instrument’s maturity date.
       konversi atau pada tanggal jatuh tempo
       instrumen.

       Opsi konversi yang diklasifikasikan sebagai                   A conversion option classified as equity is
       instrumen      ekuitas    ditentukan     dengan               determined by deducting the amount of the
       mengurangkan jumlah komponen liabilitas dari                  liability component from the fair value of the
       nilai wajar instrumen majemuk secara                          compound instrument as a whole. This is
       keseluruhan. Jumlah ini diakui dan dicatat dalam              recognized and included in equity, net of income
       ekuitas, neto setelah dampak pajak penghasilan,               tax effects, and is not subsequently remeasured.
       dan selanjutnya tidak diukur ulang. Sebagai                   In addition, the conversion option classified as
       tambahan, opsi konversi yang diklasifikasikan                 equity will remain in equity until the conversion
       sebagai instrumen ekuitas akan tetap di dalam                 option is exercised, in which case, the balance
       ekuitas hingga opsi konversi belum dieksekusi,                recognized in equity will be transferred to
       dalam kasus tersebut, jumlah yang diakui di                   “additional paid-in capital”. Where the conversion
       ekuitas akan dialihkan ke “tambahan modal                     option remains unexercised at the maturity date
       disetor”. Ketika opsi konversi masih tidak                    of the convertible notes, the balance recognized
       dieksekusi pada tanggal jatuh tempo obligasi                  in equity will be transferred to retained earnings.

                                                          29
Page 33
                                                                             The original financial statements included herein are in
                                                                                                           the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                   PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                           NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                 JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                              30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                 ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                (UNAUDITED)

       konversi, jumlah yang diakui di ekuitas akan                   No gain or loss is recognized in profit or loss upon
       dialihkan ke saldo laba. Tidak ada keuntungan                  conversion or expiration of the conversion option.
       atau kerugian yang diakui di laba rugi pada saat
       konversi atau kadaluarsa opsi konversi.

       Biaya transaksi yang berasal dari penerbitan                   Transaction costs that relate to the issue of the
       obligasi konversi dialokasikan ke liabilitas dan               convertible notes are allocated to the liability and
       komponen ekuitas sebesar proporsi terhadap                     equity components in proportion to the allocation
       alokasi hasil bruto. Biaya transaksi terkait                   of the gross proceeds. Transaction costs relating
       komponen ekuitas diakui secara langsung di                     to the equity component are recognized directly
       ekuitas. Biaya transaksi terkait komponen                      in equity. Transaction costs relating to the liability
       liabilitas diperhitungkan dalam jumlah tercatat                component are included in the carrying amount
       komponen liabilitas dan diamortisasi sepanjang                 of the liability component and are amortized over
       umur obligasi konversi menggunakan metode                      the lives of the convertible notes using the
       suku bunga efektif.                                            effective interest method.

       Liabilitas keuangan                                            Financial liabilities

       Liabilitas keuangan diklasifikasikan sebagai                   Financial liabilities are classified as either
       FVTPL atau pada biaya perolehan diamortisasi                   financial liabilities “at FVTPL” or “at amortized
       menggunakan metode suku bunga efektif.                         cost” using the effective interest method.

       Namun, liabilitas keuangan yang timbul ketika                  However, financial liabilities that arise when a
       pengalihan aset keuangan tidak memenuhi                        transfer of a financial asset does not qualify for
       syarat untuk penghentian pengakuan atau ketika                 derecognition     or    when     the    continuing
       pendekatan        keterlibatan    berkelanjutan                involvement      approach     applies,    financial
       diterapkan, kontrak jaminan keuangan yang                      guarantee contracts issued by the Company, and
       diterbitkan oleh Perusahaan, dan komitmen yang                 commitments issued by the Company to provide
       diterbitkan oleh Perusahaan untuk memberikan                   a loan at below-market interest rate are
       pinjaman dengan tingkat bunga di bawah pasar                   measured in accordance with the specific
       diukur sesuai dengan kebijakan akuntansi                       accounting policies set out below.
       spesifik yang diungkapkan di bawah ini.

       Liabilitas keuangan    pada   biaya   perolehan                Financial liabilities at amortized cost
       diamortisasi

       Liabilitas keuangan yang bukan merupakan                       Financial liabilities that are not 1) contingent
       1) imbalan kontinjen dari pihak pengakuisisi                   consideration of an acquirer in a business
       dalam kombinasi bisnis, 2) dimiliki untuk                      combination, 2) held-for-trading, or 3) designated
       diperdagangkan, atau 3) ditetapkan sebagai                     as at FVTPL, are subsequently measured at
       FVTPL, selanjutnya diukur pada biaya perolehan                 amortized cost using the effective interest
       diamortisasi dengan menggunakan metode suku                    method.
       bunga efektif.

       Liabilitas keuangan Perusahan sebagian besar                   The Company’s financial liabilities mainly consist
       merupakan utang bank, utang usaha, utang lain-                 of bank loans, accounts payable, other payables,
       lain, beban akrual, utang obligasi dan liabilitas              accrued expenses, bonds payable and lease
       sewa yang diklasifikasikan sebagai liabiltas                   liabilities which are classified as financial
       keuangan pada biaya perolehan diamortisasi.                    liabilities at amortized cost. The Company does
       Perusahaan      tidak   mempunyai      liabilitas              not have financial liabilities at FVTPL.
       keuangan pada FVTPL.

       Penilaian Apakah Arus Kas Kontraktual                          Assessment of Whether Contractual Cash
       Hanya Merupakan Pembayaran Pokok dan                           Flows are Solely Payments of Principal and
       Bunga Semata (SPPI)                                            Interest (SPPI)

       Untuk tujuan penilaian ini, pokok didefinisikan                For the purposes of this assessment, principal is
       sebagai nilai wajar dari aset keuangan pada                    defined as the fair value of the financial asset on
       pengakuan awal. Bunga didefinisikan sebagai                    initial recognition. Interest is defined as
       imbalan untuk nilai waktu atas uang dan untuk                  consideration for the time value of money and for
       risiko kredit yang terkait dengan jumlah pokok                 the credit risk associated with the principal
       yang terutang selama periode waktu tertentu dan                amount outstanding during a particular period of

                                                           30
Page 34
                                                                            The original financial statements included herein are in
                                                                                                          the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                   PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                           NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                 JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                              30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                 ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                (UNAUDITED)

       untuk risiko dan biaya pinjaman dasar lainnya                  time and for other basic lending risks and costs
       (misalnya     risiko   likuiditas   dan biaya                  (e.g. liquidity risk and administrative costs), as
       administrasi), serta marjin keuntungan.                        well as profit margin.

       Dalam menilai apakah arus kas kontraktual                      In assessing whether the contractual cash flows
       adalah SPPI, Perusahaan mempertimbangkan                       are SPPI, the Company considers the
       ketentuan kontraktual instrumen tersebut. Hal ini              contractual terms of the instrument. This includes
       termasuk menilai apakah aset keuangan                          assessing whether the financial asset contains a
       mengandung ketentuan kontraktual yang dapat                    contractual term that could change the timing or
       mengubah waktu atau jumlah arus kas                            amount of contractual cash flows such that it
       kontraktual sehingga tidak memenuhi kondisi ini.               would not meet this condition. In making the
       Dalam melakukan penilaian, Perusahaan                          assessment, the Company considers:
       mempertimbangkan:

       -   Kejadian kontijensi yang akan mengubah                     -   Contingent events that would change the
           jumlah dan waktu arus kas;                                     amount and timing of cash flows;
       -   Fitur Leverage;                                            -   Leverage features;
       -   Persyaratan pelunasan dipercepat dan                       -   Prepayment and extension terms;
           perpanjangan fasilitas;
       -   Ketentuan      yang     membatasi     klaim                -   Terms that limit the Company’s claim to cash
           Perusahaan atas arus kas dari aset tertentu                    flows from specified assets (e.g. non-
           (seperti pinjaman non-recourse);                               recourse loans); and
       -   Fitur yang memodifikasi imbalan dari nilai                 -   Features that modify consideration of the
           waktu atas uang (seperti penepatan ulang                       time value of money (e.g. periodical reset of
           suku bunga berkala).                                           interest rates).

       Penilaian Model Bisnis                                         Business Model Assessment

       Model bisnis mengacu pada bagaimana aset                       Business model refers to how financial assets
       keuangan dikelola bersama untuk menghasilkan                   are managed together to generate cash flows for
       arus kas untuk Perusahaan. Arus kas mungkin                    the Company. This may be collecting contractual
       dihasilkan dengan menerima arus kas                            cash flows, selling financial assets or both.
       kontraktual, menjual aset keuangan atau                        Business models are determined at a level of
       keduanya. Model bisnis ditentukan pada tingkat                 aggregation where groups of assets are
       agregasi di mana kelompok aset dikelola                        managed together to achieve a particular
       bersama untuk mencapai tujuan tertentu dan                     objective and do not depend on management's
       tidak bergantung pada niat manajamen pada                      intentions for individual instruments.
       instrumen individual.

       Perusahaan menilai model bisnis pada aset                      The Company assesses the business model of
       keuangan setidaknya pada tingkat lini bisnis atau              financial assets at least at business line level or
       pada di mana terdapat variasi mandat/tujuan                    where there are varying mandates or objectives
       dalam lini bisinis, pada lini bisnis produk atau               within a business line, at a more granular product
       pada tingkat desk yang lebih granular (misalnya                business line or desk level (i.e. subportfolios or
       sub-portofolio atau sub-lini bisnis).                          sub-business line).

       Penentuan model bisnis dilakukan dengan                        Business model determinations are made
       mempertimbangkan semua bukti relevan yang                      considering all relevant evidence that is available
       tersedia pada tanggal penilaian. Ini termasuk,                 at the date of the assessment. This includes, but
       tetapi tidak terbatas pada:                                    is not limited to:

       -   Bagaimana kinerja bisnis dan aset                          -   How the performance of the business and
           keuangan yang ada di dalam unit bisnis itu                     the financial assets held within that business
           dievaluasi     dan    dilaporkan      kepada                   unit are evaluated and reported to
           manajemen. Tingkat pemisahan yang                              management. The level of segregation
           diidentifikasi PSAK 71 harus konsisten                         identified for PSAK 71 classification should
           dengan       bagaimana     portofolio    aset                  be consistent with how asset portfolios are
           dipisahkan      dan   dilaporkan      kepada                   segregated and reported to senior
           manajemen;                                                     management;
       -   Risiko yang mempengaruhi kinerja unit                      -   The risks that affect the performance of the
           bisnis dan aset keuangan yang dimiliki                         business unit and the financial assets held


                                                           31
Page 35
                                                                           The original financial statements included herein are in
                                                                                                         the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                  PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                          NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                             30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                               (UNAUDITED)

           dalam unit bisnis itu dan khususnya                           within that business unit and in particular the
           bagaimana risiko itu dikelola; dan                            way those risks are managed; and
       -   Bagaimana       manajer        unit  bisnis               -   How managers of the business unit are
           dikompensasi        (misalnya,      apakah                    compensated (for example, whether the
           kompensasi didasarkan pada nilai wajar dari                   compensation is based on the fair value of
           aset yang dikelola atau pada arus kas                         the assets managed or on the contractual
           kontraktual yang dikumpulkan).                                cash flows collected).

       Penentuan model bisnis dilakukan berdasarkan                  Business model determinations are made on the
       skenario yang diperkirakan akan terjadi oleh                  basis of scenarios that the Company reasonably
       Perusahaan dan tidak dalam kondisi sangat                     expects to occur and not under highly stressed or
       tertekan atau kondisi terburuk. Jika aset dijual              'worst case' conditions. Where assets are
       dalam kondisi yang tidak diharapkan oleh                      disposed of under conditions that the Company
       Perusahaan untuk berlaku ketika aset diakui,                  did not reasonably expect to prevail when the
       klasifikasi aset keuangan yang ada dalam                      assets were recognized, the classification of
       portofolio tidak disajikan secara tidak akurat,               existing financial assets in the portfolio are not
       tetapi kondisi tersebut harus dipertimbangkan                 rendered inaccurate but the conditions in
       untuk aset yang diperoleh di masa mendatang.                  question should be considered for any assets
                                                                     acquired going forward.

       Perubahan pada model bisnis atau pengenalan                   Changes to business models or the introduction
       model bisnis baru ditentukan melalui proses                   of new business models are determined through
       persetujuan unit bisnis baru.                                 the new business unit approval process.

       Perusahaan dapat mereklasifikasi seluruh aset                 The Company can reclassifiy all of its financial
       keuangan yang terpengaruh jika dan hanya jika,                assets when and only, its business model for
       model bisnis untuk pengelolaan aset keuangan                  managing those financial assets changes.
       berubah.

       Pengakuan                                                     Recognition

       Semua aset dan liabilitas keuangan lainnya pada               All financial assets and liabilities are initially
       awalnya diakui pada tanggal pengakuan di mana                 recognized on the trade date at which the
       Perusahaan menjadi suatu pihak dalam                          Company becomes a party to the contractual
       ketentuan kontraktual instrumen tersebut.                     provisions of the instruments.

       Pada saat pengakuan awal, aset keuangan atau                  A financial asset or financial liability is initially
       liabilitas keuangan diukur pada nilai wajar                   measured at fair value plus/less (for an item not
       ditambah/dikurangi (untuk item yang tidak diukur              subsequently measured at fair value through
       pada nilai wajar melalui laba rugi setelah                    profit or loss) transaction costs that are directly
       pengakuan awal) biaya transaksi yang dapat                    attributable to the acquisition of a financial asset
       diatribusikan secara langsung atas perolehan                  or issuance of a financial liability. The
       aser keuangan atau penerbitan liabilitas                      subsequent measurement of financial assets and
       keuangan. Pengukuran aset keuangan dan                        financial liabilities depends on their classification.
       liabilitas keuangan setelah pengakuan awal
       tergantung pada klasifikasi aset keuangan dan
       liabilitas keuangan tersebut.

       Biaya transaksi hanya meliputi biaya-biaya yang               Transaction costs include only those costs that
       dapat diatribusikan secara langsung untuk                     are directly attributable to the acquisition of a
       perolehan suatu aset keuangan atau penerbitan                 financial asset or issuance of a financial liability
       suatu liabilitas keuangan dan merupakan biaya                 and are incremental costs that would not have
       tambahan yang tidak akan terjadi apabila                      been incurred if the instrument had not been
       instrumen keuangan tersebut tidak diperoleh                   acquired or issued.
       atau diterbitkan.

       Untuk liabilitas keuangan, biaya transaksi                    For financial liabilities, transaction costs are
       dikurangkan dari jumlah utang yang diakui pada                deducted from the amount of debt initially
       pengakuan awal liabilitas. Biaya transaksi                    recognized. Such transactions costs are
       tersebut diamortisasi selama umur instrumen                   amortized over the terms of the instruments
       berdasarkan metode suku bunga efektif dan                     based on the effective interest method and are
       dicatat sebagai bagaian dari beban bunga.                     recorded as part of interest expense.

                                                          32
Page 36
                                                                              The original financial statements included herein are in
                                                                                                            the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                     PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                             NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                   JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                   ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                  (UNAUDITED)

       Pengukuran Biaya Perolehan Diamortisasi                          Amortized Cost Measurement

       Biaya perolehan diamortisasi dari aset keuangan                  The amortized cost of a financial asset or
       atau liabilitas keuangan adalah jumlah aset atau                 financial liability is the amount at which the
       liabilitas keuangan yang diukur pada saat                        financial asset or liability is measured at initial
       pengakuan awal, dikurangi pembayaran pokok,                      recognition, less principal repayments, plus or
       ditambah atau dikurangi dengan amortisasi                        less the cumulative amortisation using the
       kumulatif dengan menggunakan metode suku                         effective interest method of any difference
       bunga efektif yang dihitung dari selisih antara                  between the initial amount recognized and the
       nilai awal dan nilai jatuh temponya dan dikurangi                maturity amount and minus any allowance for
       cadangan kerugian penurunan nilai.                               impairment losses.

       Kerugian penurunan nilai dilaporkan sebagai                      The impairment loss is reported as a deduction
       pengurang dari nilai tercatat dari aset keuangan                 from the carrying value of the financial assets
       dalam kelompok biaya perolehan diamortisasi,                     classified as at amortized cost and recognized in
       dan diakui di dalam laporan laba rugi sebagai                    the statement of profit or loss as impairment
       kerugian penurunan nilai aset keuangan.                          losses on financial assets.

       Tingkat suku bunga efektif adalah suku bunga                     The effective interest rate is the rate that exactly
       yang secara tepat mendiskontokan estimasi arus                   discounts the estimated future cash flows
       kas di masa datang selama perkiraan umur dari                    through the expected life of the financial asset or
       aset keuangan atau liabilitas keuangan (atau jika                financial liability (or, where appropriate, a shorter
       lebih tepat, digunakan periode lain yang lebih                   period) to the net carrying amount at initial
       singkat) untuk memperoleh nilai tercatat bersih                  recognition. When calculating the effective
       pada saat pengakuan awal. Pada saat                              interest rate, the Company estimates future cash
       menghitung tingkat suku bunga efektif,                           flows considering all contractual terms of the
       Perusahaan mengestimasi arus kas di masa                         financial instrument.
       datang dengan mempertimbangkan seluruh
       persyaratan kontraktual dalam instrumen
       keuangan tersebut.

       Pengukuran Nilai Wajar                                           Fair Value Measurement

       Nilai wajar adalah harga yang akan diterima                      Fair value is the price that would be received to
       untuk menjual suatu aset atau harga yang akan                    sell an asset or paid to transfer a liability in an
       dibayar untuk mengalihkan suatu liabilitas dalam                 orderly transaction between market participants
       transaksi teratur (orderly transaction) antara                   at the measurement date in the principal market
       pelaku pasar (market participants) pada tanggal                  or, in its absence, the most advantageous market
       pengukuran di pasar utama atau, jika tidak                       to which the Company has access at that date.
       terdapat pasar utama, di pasar yang paling
       menguntungkan dimana Perusahaan memiliki
       akses pada tanggal tersebut.

       Jika tersedia, Perusahaan mengukur nilai wajar                   When available, the Company measures the fair
       instrumen keuangan dengan menggunakan                            value of a financial instrument using the quoted
       harga kuotasian di pasar aktif untuk instrumen                   price in an active market for that instrument.
       tersebut. Suatu pasar dianggap aktif jika                        A market is regarded as active if transactions for
       transaksi atas aset dan liabilitas terjadi dengan                the asset or liability take place with sufficient
       frekuensi dan informasi penentuan harga secara                   frequency and volume to provide pricing
       berkelanjutan.                                                   information on an ongoing basis.

       Jika harga kuotasian tidak tersedia di pasar aktif,              If there is no quoted price in an active market,
       Perusahaan menggunakan teknik peniliaian                         then the Company uses valuation techniques
       dengan memaksimalkan penggunaan input yang                       that maximise the use of relevant observable
       dapat     diobservasi    dan      relevan     dan                inputs and minimize the use of unobservable
       meminimalkan penggunaan input yang tidak                         inputs. The chosen valuation technique
       dapat diobservasi. Teknik penilaian yang dipilih                 incorporates all of the factors that market
       menggabungkan         semua       faktor     yang                participants would take into account in pricing a
       diperhitungkan oleh pelaku pasar dalam                           transaction.
       penentuan harga transaksi.

       Bukti terbaik atas nilai wajar instrumen keuangan                The best evidence of the fair value of a financial
       pada saat pengakuan awal adalah harga                            instrument at initial recognition is normally the
       transaksi, yaitu nilai wajar dari pembayaran yang                transaction price, i.e., the fair value of the
       diberikan atau diterima. Jika Perusahaan                         consideration given or received. If the Company

                                                             33
Page 37
                                                                              The original financial statements included herein are in
                                                                                                            the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                     PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                             NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                   JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                   ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                  (UNAUDITED)

       menetapkan bahwa nilai wajar pada pengakuan                      determines that the fair value at initial recognition
       awal berbeda dengan harga transaksi dan nilai                    differs from the transaction price and the fair
       wajar tidak dapat dibuktikan dengan harga                        value is evidenced neither by a quoted price in
       kuotasian di pasar aktif untuk aset atau liabilitas              an active market for an identical asset or liability
       yang identik atau berdasarkan teknik penilaian                   nor based on a valuation technique that uses
       yang hanya menggunakan data dari pasar yang                      only data from observable markets, then the
       dapat diobservasi, maka nilai wajar instrumen                    financial instrument is initially measured at fair
       keuangan pada saat pengakuan awal                                value, adjusted to defer the difference between
       disesuaikan untuk menangguhkan perbedaan                         the fair value at initial recognition and the
       antara nilai wajar pada saat pengakuan awal dan                  transaction price. Subsequently, that difference
       harga transaksi. Setelah pengakuan awal,                         is recognized in profit or loss on an appropriate
       perbedaan tersebut diakui dalam laba rugi                        basis over the life of the instrument but no later
       berdasarkan umur dari instrumen tersebut                         than when the valuation is wholly supported by
       namun tidak lebih lambat dari saat penilaian                     observable market data or the transaction is
       tersebut didukung sepenuhnya oleh pasar yang                     closed out.
       dapat diobservasi atau saat transaksi ditutup.

       Penghentian Pengakuan                                            Derecognition

       Perusahaan menghentikan pengakuan aset                           The Company derecognizes a financial asset
       keuangan pada saat hak kontraktual atas arus                     when the contractual rights to the cash flows from
       kas yang berasal dari aset keuangan tersebut                     the financial asset expire, or when it transfers the
       kadaluwarsa atau Perusahaan mentransfer                          rights to receive the contractual cash flows on the
       seluruh hak untuk menerima arus kas kontraktual                  financial asset in a transaction in which
       dari aset keuangan dalam transaksi dimana                        substantially all the risks and rewards of
       Perusahaan         secara     substantial telah                  ownership of the financial asset are transferred.
       mentransfer seluruh risiko dan manfaat atas                      Any interest in transferred financial assets that is
       kepemilikan aset keuangan yang ditransfer.                       created or retained by the Company is
       Setiap hak atau liabilitas atas aset keuangan                    recognized as a separate asset or liability.
       yang ditransfer yang timbul atau yang masih
       dimiliki oleh Perusahaan diakui sebagai aset
       atau liabilitas secara terpisah.

       Dalam transaksi dimana Perusahaan secara                         In transactions in which the Company neither
       substantial tidak memiliki atau tidak mentransfer                retains nor transfers substantially all the risks and
       seluruh risiko dan manfaat atas kepemilikan aset                 rewards of ownership of a financial asset, the
       keuangan,        Perusahaan         menghentikan                 Company derecognizes the asset if it does not
       pengakuan aset tersebut jika Perusahaan tidak                    retain control over the asset. The rights and
       lagi memiliki pengendalian atas aset tersebut.                   obligations retained in the transfer are
       Hak dan kewajiban yang masih dimiliki dalam                      recognized separately as assets and liabilities as
       transfer tersebut diakui secara terpisah sebagai                 appropriate. In transfers in which control over the
       aset atau liabilitas. Dalam transfer dimana                      asset is retained, the Company continues to
       pengendalian atas aset masih dimiliki,                           recognise the asset to the extent of its continuing
       Perusahaan tetap mengakui aset yang ditransfer                   involvement, determined by the extent to which it
       tersebut sebesar keterlibatan keberlanjutan,                     is exposed to changes in the value of the
       dimana tingkat keberlanjutan Perusahaan dalam                    transferred asset.
       aset yang ditransfer adalah sebesar perubahan
       nilai aset yang ditransfer.

       Pada penghentian pengakuan aset keuangan                         On derecognition of a financial asset measured
       yang diukur pada biaya perolehan diamortisasi,                   at amortized cost, the difference between the
       perbedaan antara nilai tercatat aset dan jumlah                  asset’s carryingamount and the sum of the
       imbalan yang diterima dan piutang diakui dalam                   consideration received and receivable is
       laba rugi.                                                       recognized in profit or loss.

       Perusahaan menghapusbukukan aset keuangan                        The Company writes off a financial asset and any
       dan cadangan kerugian penurunan nilai, pada                      related allowance for impairment losses, when
       saat Perusahaan menentukan bahwa aset                            the Company determines that the financial asset
       keuangan tersebut tidak dapat ditagih                            is completely uncollectible.
       seluruhnya.

       Perusahaan menghentikan pengakuan liabilitas                     The Company derecognizes financial liabilities
       keuangan, jika dan hanya jika, liabilitas                        when, and only when, the Company’s obligations
       Perusahaan telah dilepaskan, dibatalkan atau                     are discharged, cancelled or have expired.
       kadaluarsa. Selisih antara jumlah tercatat                       The difference between the carrying amount of

                                                             34
Page 38
                                                                                The original financial statements included herein are in
                                                                                                              the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                       PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                               NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                     JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                  30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                     ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                    (UNAUDITED)

       liabilitas   keuangan      yang   dihentikan                       the financial liability derecognized and the
       pengakuannya dan imbalan yang dibayarkan                           consideration paid and payable is recognized in
       dan utang diakui dalam laba rugi.                                  profit or loss.

       Ketika Perusahaan bertukar dengan pemberi                          When the Company exchanges with the existing
       pinjaman, satu instrumen utang menjadi                             lender one debt instrument into another one with
       instrumen lain dengan persyaratan yang berbeda                     substantially different terms, such exchange is
       secara substansial, pertukaran tersebut dicatat                    accounted for as an extinguishment of the
       sebagai penghapusan liabilitas keuangan                            original financial liability and the recognition of a
       orisinal dan pengakuan liabilitas keuangan baru.                   new financial liability. Similarly, the Company
       Demikian pula, Perusahaan memperhitungkan                          accounts for substantial modification of terms of
       modifikasi substansial dari ketentuan liabilitas                   an existing liability or part of it as an
       yang ada atau bagian dari liabilitas tersebut                      extinguishment of the original financial liability
       sebagai pelepasan liabilitas keuangan orisinal                     and the recognition of a new liability. It is
       dan pengakuan liabilitas baru. Diasumsikan                         assumed that the terms are substantially different
       bahwa       persyaratannya        berbeda     secara               if the discounted present value of the cash flows
       substansial jika nilai kini arus kas yang didiskonto               under the new terms, including any fees paid net
       berdasarkan persyaratan yang baru, termasuk                        of any fees received and discounted using the
       setiap fee (imbalan) yang dibayarkan setelah                       original effective rate is at least 10% different
       dikurangi setiap fee (imbalan) yang diterima dan                   from the discounted present value of the
       didiskonto menggunakan suku bunga efektif                          remaining cash flows of the original financial
       orisinal, berbeda sedikitnya 10% dari nilai kini                   liability. If the modification is not substantial, the
       sisa arus kas yang didiskonto yang berasal dari                    difference between: (1) the carrying amount of
       liabilitas keuangan orisinal. Jika modifikasi tidak                the liability before the modification; and (2) the
       substansial, maka perbedaan antara: (1) jumlah                     present value of the cash flows after modification
       tercatat liabilitas sebelum modifikasi; dan (2) nilai              is recognized in profit or loss as the modification
       kini dari arus kas setelah modifikasi, diakui dalam                gain or loss within other gains and losses.
       laba rugi sebagai keuntungan atau kerugian
       modifikasi dalam keuntungan dan kerugian
       lainnya.

       Saling Hapus                                                       Offsetting

       Aset keuangan dan liabilitas keuangan                              Financial assets and liabilities are offset and the
       disalinghapuskan dan jumlah netonya dilaporkan                     net amount is reported in the statement of
       pada laporan posisi keuangan ketika terdapat                       financial position when there is a legally
       hak yang berkekuatan hukum untuk melakukan                         enforceable right to offset the recognized
       saling hapus atas jumlah yang telah diakui                         amounts and there is an intention to settle on a
       tersebut dan adanya niat untuk menyelesaikan                       net basis, or realize the asset and settle the
       liabilitas secara bersamaan. Hak saling hapus                      liability simultaneously. The legally enforceable
       tidak kontinjen atas peristiwa di masa depan dan                   right must not be contingent on future events and
       dapat dipaksakan secara hukum dalam situasi                        must be enforceable in the normal course of
       bisnis yang normal dan dalam peristiwa gagal                       business and in the event of default in solvency
       bayar,      atau   peristiwa    kepailitan  atau                   or bankcruptcy or the Company or the
       kebangkrutan Perusahaan atau pihak lawan.                          counterparty.

       Pendapatan dan beban disajikan dalam jumlah                        Income and expenses are presented on a net
       bersih hanya jika diperkenankan oleh standar                       basis only when permitted by accounting
       akuntansi.                                                         standards.

       Identifikasi dan        Pengukuran        Kerugian                 Identification and               Measurement               of
       Penurunan Nilai                                                    Impairment Losses

       PSAK 71 mengharuskan cadangan kerugian                             PSAK 71 requires a loss allowance to be
       diakui sebesar kerugian kredit ekspektasian                        recognized at an amount equal to either
       12 bulan (12-month Expected Credit Loss (ECL)                      12-month or lifetime Expected Credit Loss
       atau kerugian kredit ekspektasian sepanjang                        (ECLs). Lifetime ECLs are the ECLs that result
       umur aset keuangan (lifetime ECL). Lifetime ECL                    from all possible default events over the
       adalah kerugian kredit ekspektasian yang                           expected life of a financial instrument, whereas
       berasal dari semua kemungkinan kejadian gagal                      12-month ECLs are the portion of ECLs that
       bayar sepanjang umur ekspektasian suatu                            result from default events that are possible within
       instrumen keuangan, sedangkan ECL 12 bulan                         the 12 months after reporting date.
       adalah porsi dari kerugian kredit ekspektasian
                                                               35
Page 39
                                                                             The original financial statements included herein are in
                                                                                                           the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                    PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                            NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                  JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                               30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                  ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                 (UNAUDITED)

       yang berasal dari kemungkinan kejadian gagal
       bayar dalam 12 bulan setelah tanggal pelaporan.

       Kerugian kredit ekspektasian atau ECL diakui                    ECLs are recognized for all accounts receivable
       untuk seluruh instrumen piutang usaha dan                       and financial guarantees that are classified as
       jaminan keuangan yang diklasifikasikan sebagai                  hold to collect/hold to collect and sell and have
       hold to collect/ hold to collect and sell dan                   cash flows that are solely payments of principal
       memiliki arus kas SPPI.                                         and interest.

       Model ECL yang digunakan Perusahaan adalah                      The ECL model used by the Company is a model
       model yang menggunakan matriks Probability of                   that uses a probability of default (PD) matrix
       Default (PD) yang didiskontokan dengan                          which is discounted using the effective interest
       menggunakan suku bunga efektif. Probabilitas                    rate. This probability is the probability that occurs
       tersebut merupakan probabilitas yang timbul di                  at a time when the debtor is in default, calibrated
       suatu waktu dimana debitur mengalami gagal                      up to 12 months after the reporting date (stage 1)
       bayar, dikalibrasikan sampai dengan 12 bulan                    or over its lifetime (Stages 2 and 3) and is
       setelah tanggal pelaporan (stage 1) atau                        combined with the impact of future economic
       sepanjang umur (Stage 2 dan 3) dan                              assumptions that have credit risk. PD is
       digabungkan pada dampak asumsi ekonomi                          estimated at a point in time where it fluctuates
       masa depan yang memiliki risiko kredit. PD                      according to the economic cycle.
       diestimasikan pada point in time dimana hal ini
       berfluktuasi sejalan dengan siklus ekonomi.

       Kerugian Kredit Ekspektasian 12 Bulan                           12 Months Expected Credit Losses (Stage 1)
       (Stage 1)

       Kerugian kredit ekspektasian diakui pada saat                   Expected credit losses are recognized at the time
       pengakuan awal instrumen keuangan dan                           of initial recognition of a financial instrument and
       merepresentasikan kekurangan kas sepanjang                      represent the lifetime cash shortfalls arising from
       umur aset yang timbul dari kemungkinan gagal                    possible default events up to twelve months after
       bayar di masa yang akan datang dalam kurun                      the reporting date. Expected credit losses
       waktu 12 bulan setelah tanggal pelaporan.                       continue to be determined on this basis until
       Kerugian kredit ekspektasian terus ditentukan                   there is either a significant increase in the credit
       oleh dasar ini sampai timbul peningkatan risiko                 risk of an instrument or the instrument becomes
       kredit yang signifikan pada instrumen tersebut                  credit impaired. If an instrument is no longer
       atau instrumen tersebut telah mengalami                         considered to exhibit a significant increase in
       penurunan nilai kredit. Jika suatu Instrumen tidak              credit risk, expected credit losses will revert to
       lagi dianggap menunjukkan peningkatan risiko                    being determined on a 12 (twelve) months basis
       kredit yang signifikan, maka kerugian kredit                    after the reporting date.
       ekspektasian dihitung kembali berdasarkan
       basis 12 (dua belas) bulan setelah tanggal
       pelaporan.

       Peningkatan Risiko Kredit yang Signifikan                       Significant Increase in Credit Risk (Stage 2)
       (Stage 2)

       Jika aset keuangan mengalami peningkatan                        If a financial asset experiences a significant
       risiko kredit yang signifikan sejak pengakuan                   increase in credit risk since initial recognition, an
       awal, kerugian kredit ekspektasian diakui atas                  expected credit loss provision is recognized for
       kejadian gagal bayar yang mungkin terjadi                       default events that may occur over the lifetime of
       sepanjang umur aset. Peningkatan signifikan                     the asset. Significant increase in credit risk is
       dalam      risiko     kredit     dinilai   dengan               assessed by comparing the risk of default of an
       membandingkan risiko gagal bayar atas                           exposure at the reporting date to the risk of
       eksposur pada tanggal pelaporan dengan risiko                   default at origination (after taking into account the
       gagal bayar saat pengakuan awal (setelah                        passage of time). Significant does not mean
       memperhitungkan perjalanan waktu dari akun                      statistically significant nor is it assessed in the
       tersebut). Signifikan tidak berarti signifikan                  context of changes in expected credit loss.
       secara statistik, juga tidak dinilai dalam konteks
       perubahan dalam cadangan kerugian kredit
       ekspektasian.




                                                            36
Page 40
                                                                             The original financial statements included herein are in
                                                                                                           the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                   PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                           NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                 JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                              30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                 ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                (UNAUDITED)

        Eksposur yang Mengalami Penurunan Nilai                        Credit Impaired (or Defaulted) Exposures
        Kredit atau Gagal Bayar (Stage 3)                              (Stage 3)

        Aset keuangan yang mengalami penurunan nilai                   Financial assets that are credit impaired (or in
        (atau gagal bayar) merupakan aset yang                         default) represent those that are at least 180
        setidaknya telah memiliki tunggakan lebih dari                 days past due after the reporting date. Financial
        180 hari setelah tanggal pelaporan. Aset                       assets are also considered to be credit impaired
        keuangan juga dianggap mengalami penurunan                     where the debtors are unlikely to pay on the
        nilai kredit dimana debitur kemungkinan besar                  occurrence of one or more observable events
        tidak akan membayar dengan terjadinya satu                     that have a detrimental impact on the estimated
        atau lebih kejadian yang teramati yang memiliki                future cash flows of the financial asset. Loss
        dampak menurunkan jumlah estimasi arus kas                     provisions against credit impaired financial
        masa depan dari aset keuangan tersebut.                        assets are determined based on an assessment
        Cadangan kerugian penurunan nilai terhadap                     of the recoverable cash flows under a range of
        aset keuangan yang mengalami penurunan nilai                   scenarios, including the realization of any
        ditentukan berdasarkan penilaian terhadap arus                 collateral held where appropriate. The ECL will
        kas yang dapat dipulihkan berdasarkan sejumlah                 reflect weighted average of the scenarios based
        skenario, termasuk realisasi jaminan yang                      on the probability of the relevant scenario to
        dimiliki jika memungkinkan. ECL akan                           occur. The loss provisions held represent the
        mencerminkan rata-rata tertimbang dari skenario                difference between the present value of the cash
        berdasarkan probabilitas dari skenario yang                    flows expected to be recovered, discounted at
        relevan untuk terjadi. Cadangan kerugian                       the instruments original effective interest rate,
        penurunan nilai merupakan selisih antara nilai                 and the gross carrying value of the instrument
        sekarang dari arus kas yang diperkirakan akan                  prior to any credit impairment.
        dipulihkan, didiskontokan pada suku bunga
        efektif awal, dan nilai tercatat bruto instrumen
        sebelum penurunan nilai kredit.

        Periode yang diperhitungkan ketika mengukur                    The period considered when measuring
        kerugian kredit ekspektasian adalah periode                    expected credit loss is the shorter of the
        yang lebih pendek antara umur ekspektasian dan                 expected life and the contractual term of the
        periode kontrak aset keuangan. Umur                            financial asset. The expected life may be
        ekspektasian     dapat     dipengaruhi    oleh                 impacted by prepayments and the maximum
        pembayaran dimuka dan periode kontrak                          contractual term by extension options.
        maksimum melalui opsi perpanjangan kontrak.

        Untuk aset yang diukur pada biaya perolehan                    For assets measured at amortized cost, the
        diamortisasi, saldo di laporan posisi keuangan                 statement of financial position amount reflects
        mencerminkan aset bruto dikurangi kerugian                     the gross asset less the expected credit losses.
        kredit ekspektasian.

        Pengukuran dan pengakuan atas kerugian                         Measurement and recognition of expected
        kredit ekspektasian                                            credit losses

        Untuk aset keuangan, kerugian kredit                           For financial assets, the expected credit loss is
        ekspektasian diestimasi sebagai selisih antara                 estimated as the difference between all
        seluruh arus kas kontraktual yang jatuh tempo                  contractual cash flows that are due to the
        kepada Perusahaan sesuai dengan kontrak dan                    Company in accordance with the contract and all
        seluruh arus kas yang diekspektasi akan diterima               the cash flows that the Company expects to
        oleh Perusahaan, didiskontokan pada suku                       receive, discounted at the original effective
        bunga efektif awal.                                            interest rate.

   f.   Kas dan Setara Kas                                        f.   Cash and Cash Equivalents

        Untuk tujuan penyajian arus kas, kas dan setara                For cash flow presentation purposes, cash and
        kas terdiri dari kas, bank dan deposit berjangka               cash equivalents consist of cash on hand and in
        yang jatuh tempo dalam waktu tiga bulan atau                   banks, and time deposits with maturities of three
        kurang dari tanggal perolehannya dan yang tidak                months or less from the date of placement.
        dijaminkan serta tidak dibatasi penggunaannya.

   g.   Piutang Usaha                                             g.   Accounts Receivable

        Jika piutang diperkirakan dapat ditagih dalam                  If collection is expected in one year or less (or in
        waktu satu tahun atau kurang (atau dalam siklus                the normal operating cycle of the business if
                                                           37
Page 41
                                                                              The original financial statements included herein are in
                                                                                                            the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                    PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                            NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                  JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                               30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                  ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                 (UNAUDITED)

        operasi normal jika lebih panjang), piutang                     longer), they are classified as current assets.
        diklasifikasikan sebagai aset lancar. Jika tidak,               Otherwise, they are presented as non-current
        piutang disajikan sebagai aset tidak lancar.                    assets.

   h.   Tagihan Bruto                                              h.   Gross Amounts Due from Customers

        Tagihan bruto merupakan piutang Perusahaan                      Gross amounts due from customers represent
        yang berasal dari pekerjaan kontrak konstruksi                  the Company’s receivables originating from
        yang dilakukan namun pekerjaan yang dilakukan                   construction contract in progress. Gross amounts
        masih dalam pelaksanaan. Tagihan bruto                          due from customers are presented as the net
        disajikan sebesar selisih antara biaya yang                     amount of costs incurred plus recognized profits,
        terjadi ditambah laba yang diakui dikurangi                     less the sum of recognized losses and progress
        dengan kerugian yang diakui dan termin.                         billings.

        Tagihan bruto diakui sebagai pendapatan sesuai                  Gross amounts due from customers are
        dengan metode persentase penyelesaian yang                      recognized as revenue based on the percentage
        dinyatakan dalam berita acara penyelesaian                      of completion method, which is stated on the
        pekerjaan, dimana faktur belum dapat ditagihkan                 certificate of work completion, while the invoice is
        karena perbedaan antara tanggal berita acara                    still unbilled due to the difference between the
        progres fisik dengan pengajuan penagihan pada                   date of physical progress certificates and the
        tanggal laporan posisi keuangan.                                submission of billing on the statement of financial
                                                                        position date.

   i.   Biaya Dibayar Dimuka                                       i.   Prepaid Expenses

        Biaya dibayar dimuka merupakan biaya yang                       Prepaid expenses are costs that have been paid
        telah dibayar namun pembebanannya baru akan                     but will be incurred in future periods, such as
        dilakukan pada periode yang akan datang,                        prepaid insurance premiums, prepaid interest
        seperti premi asuransi dibayar dimuka, bunga                    and rent paid in advance. Prepaid expenses are
        dibayar dimuka, dan sewa dibayar dimuka. Biaya                  amortized over the periods of benefit using the
        dibayar dimuka diamortisasi sesuai dengan                       straight-line method.
        masa manfaatnya dengan menggunakan
        metode garis lurus.

   j.   Persediaan                                                 j.   Inventories

        Persediaan dinyatakan berdasarkan biaya                         Inventories are stated at cost or net realizable
        perolehan atau nilai realisasi bersih, mana yang                value, whichever is lower. Cost is determined
        lebih rendah. Biaya perolehan ditentukan dengan                 using the First In First Out (FIFO) basis. The cost
        metode Masuk Pertama Keluar Pertama                             of inventories comprises of cost of purchases,
        (MPKP). Biaya persediaan terdiri dari seluruh                   cost of conversion, direct labour and attributable
        biaya pembelian, biaya konversi, tenaga kerja                   production overheads based on normal levels of
        langsung, dan biaya overhead produksi                           activity. Net realizable value represents the
        berdasarkan tingkat aktivitas normal. Nilai                     estimated selling price for inventories less all
        realisasi bersih merupakan estimasi harga jual                  estimated costs of completion and other costs
        dari persediaan dikurangi seluruh biaya                         necessary to make the sale.
        penyelesaian dan estimasi biaya yang diperlukan
        untuk melakukan penjualan.

        Penyisihan penurunan nilai persediaan diakui                    Allowance for decline in value of inventories is
        berdasarkan kondisi fisik persediaan dan                        recognized based on physical conditions of the
        persediaan yang bergerak lambat dengan                          inventories and slow-moving inventories taking
        mempertimbangkan manfaat masa depan dan                         into account future benefits and net realizable
        nilai realisasi bersih.                                         value.

        Berdasarkan SK No. 144.1/SK/WBP/PEN/2021                        Based on SK No. 144.1/SK/WBP/PEN/ 2021
        tanggal 27 Desember 2021 tentang Revisi                         dated December 27, 2021 concerning Revision
        Kebijakan Pedoman Akuntansi, diputuskan                         of Accounting Guidelines Policy, the Company
        bahwa Perusahaan mengganti metode biaya                         changed its inventory cost measurement
        persediaan dengan metode biaya standar.                         technique to the standard cost method. The
        Beban varians dari biaya standar merupakan                      variance of standard costs is an evaluation of the
        evaluasi atas jumlah normal atau tidak normal                   normal or abnormal amount of wasted production

                                                            38
Page 42
                                                                               The original financial statements included herein are in
                                                                                                             the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                     PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                             NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                   JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                   ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                  (UNAUDITED)

        atas pemborosan biaya produksi. Selanjutnya                      costs. Furthermore, the variance expense from
        beban varians dari persediaan dikeluarkan dari                   inventories is removed from the cost of
        beban persediaan dan diakui sebagai beban                        inventories and recognized as non-contributing
        non-contributing plant usaha dalam periode                       plant expenses in the period in which they are
        terjadinya meliputi:                                             incurred, including:

        a.   Jumlah yang tidak normal atas pemborosan                    a.   Abnormal amounts of wasted materials,
             bahan, tenaga kerja atau biaya produksi                          labor or other production costs;
             lainnya;
        b.   Biaya penyimpanan kecuali biaya tersebut                    b.   Storage costs unless these costs are
             diperlukan dalam proses produksi sebelum                         needed in the production process before
             dilanjutkan pada tahap produksi selanjutnya;                     proceeding to the next stage of production;
        c.   Biaya administrasi dan umum yang tidak                      c.   General and administrative expenses that
             memberikan konstribusi untuk membuat                             do not contribute to keeping the inventory in
             persediaan berada dalam kondisi dan lokasi                       its current state and location; and
             saat ini; dan
        d.   Biaya penjualan.                                            d.   Sales costs.

   k.   Aset Tetap                                                  k.   Property, Plant and Equipment

        Aset tetap kecuali tanah dan bangunan di                         Property, plant and equipment, except for land
        pertanggungjawabkan dengan menggunakan                           and building, are accounted for using the cost
        model biaya dan dinyatakan berdasarkan biaya                     model and stated at acquisition cost less
        perolehan     setelah  dikurangi   akumulasi                     accumulated depreciation and accumulated
        penyusutan, jika ada.                                            impairment losses, if any.

        Aset tetap tanah dan bangunan dinyatakan                         Land and buildings are stated at their revalued
        berdasarkan nilai revaluasi yang merupakan nilai                 amounts, being the fair value at the date of
        wajar pada tanggal revaluasi dikurangi                           revaluation, less any subsequent accumulated
        akumulasi penyusutan dan akumulasi rugi                          depreciation and subsequent accumulated
        penurunan nilai yang terjadi setelah tanggal                     impairment losses, except for land which is not
        revaluasi, kecuali untuk tanah tidak disusutkan.                 depreciated. Revaluation is made with sufficient
        Revaluasi dilakukan dengan keteraturan yang                      regularity to ensure that the carrying amount
        memadai untuk memastikan bahwa jumlah                            does not differ materially from the amount
        tercatat tidak berbeda secara material dari                      determined using fair value at the reporting date.
        jumlah yang ditentukan menggunakan nilai wajar
        pada tanggal laporan.

        Kenaikan yang berasal dari revaluasi tanah dan                   Any revaluation increase arising on the
        bangunan        diakui      pada      penghasilan                revaluation of such land and buildings is
        komprehensif lain dan terakumulasi dalam                         recognized in other comprehensive income and
        ekuitas pada bagian komponen ekuitas lainnya,                    accumulated in equity under the heading of
        kecuali sebelumnya penurunan revaluasi atas                      “other component of equity”, except to the extent
        aset yang sama pernah diakui dalam laporan                       that it reverses a revaluation decrease, for the
        laba rugi, dalam hal ini kenaikan revaluasi hingga               same asset, which was previously recognized in
        sebesar penurunan nilai aset akibat revaluasi                    profit or loss, in which case the increase is
        tersebut, dikreditkan dalam laporan laba rugi.                   credited to profit or loss to the extent of the
        Penurunan jumlah tercatat yang berasal dari                      decrease previously charged. A decrease in
        revaluasi tanah dan bangunan dibebankan                          carrying amount arising on the revaluation of
        dalam laporan laba rugi apabila penurunan                        such land and buildings is charged to profit or
        tersebut melebihi saldo surplus revaluasi aset                   loss to the extent that it exceeds the balance, if
        yang bersangkutan, jika ada.                                     any.

        Surplus revaluasi tanah dan bangunan yang                        The revaluation surplus in respect of land and
        telah disajikan dalam ekuitas dipindahkan                        buildings is directly transferred to retained
        langsung ke saldo laba pada saat aset tersebut                   earnings when the asset is derecognized.
        dihentikan pengakuannya.

        Jika aset revaluasi tidak mengalami perubahan                    If there is no significant changes in fair value of
        nilai wajar secara signifikan, aset tersebut akan                assets revaluation, those assets will be
        direvaluasi paling kurang setiap 3 (tiga) tahun.                 revaluated every 3 (three) years.


                                                             39
Page 43
                                                                                The original financial statements included herein are in
                                                                                                              the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                   PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                           NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                 JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                              30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                 ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                (UNAUDITED)

       Penyusutan diakui dengan metode garis lurus                        Depreciation is recognized so as to write-off the
       dan metode saldo menurun berganda setelah                          cost of assets less residual values using the
       memperhitungkan nilai residu berdasarkan                           straight-line method and double declining
       taksiran masa aset tetap sebagai berikut:                          method based on the estimated useful lives of
                                                                          the assets as follows:

                                                            Tahun/Years
       Garis lurus                                                                                                 Straight-line
       Gedung dan pabrik                                         20                                        Buildings and plant
       Peralatan                                                4-16                                               Equipment
       Saldo menurun berganda                                                                                  Double declining
       Perlengkapan kantor                                       4                                          Office equipment
       Kendaraan                                                 4                                                    Vehicles

       Peralatan terdiri dari golongan I, II dan III.                     Equipment are categorized into categories I, II
       Peralatan golongan I adalah peralatan yang                         and III. Equipment under category I consist of
       merupakan mebel dan peralatan dibuat dari kayu                     equipment that are furniture and equipment
       dan rotan, mesin kantor, dan alat komunikasi,                      which are made of wood and rattan, office
       dengan masa manfaat 4 tahun.                                       machines, and communications tools, with useful
                                                                          lives of 4 years.

       Peralatan golongan II adalah peralatan yang                        Equipment under category II consist of
       merupakan mebel dan peralatan dibuat dari                          equipment that are furniture and equipment
       logam, peralatan yang dipergunakan seperti truk                    which are made of metal, used equipment such
       berat, dump trucks, crane bulldozer dan alat                       as heavy trucks, dump trucks, cranes bulldozers
       berat lainnya, dengan masa manfaat 8 tahun.                        and other heavy equipment, with useful lives of 8
                                                                          years.

       Peralatan golongan III adalah peralatan yang                       Equipment under category III is equipment made
       dibuat dari logam, peralatan yang dipergunakan                     of metal equipment used for long-term production
       untuk produksi jangka panjang dengan masa                          with a useful life of 16 years.
       manfaat 16 tahun.

       Perlengkapan kantor termasuk dalam golongan I                      Office equipment is included in category I with
       dengan masa manfaat 4 tahun.                                       useful lives of 4 years.

       Masa manfaat ekonomis, nilai residu dan metode                     The estimated useful lives, residual values and
       penyusutan ditelaah setiap akhir periode dan                       depreciation method are reviewed at each period
       pengaruh dari setiap perubahan estimasi                            end, with the effect of any changes in estimate
       tersebut berlaku prospektif.                                       accounted for on a prospective basis.

       Beban pemeliharaan dan perbaikan dibebankan                        The cost of maintenance and repairs is charged
       pada laporan laba rugi pada saat terjadinya.                       to profit, or loss as incurred. Other costs incurred
       Biaya-biaya lain yang terjadi selanjutnya yang                     subsequently to add to, replace part of, or service
       timbul untuk menambah, mengganti atau                              an item of property, plant and equipment, are
       memperbaiki aset tetap dicatat sebagai biaya                       recognized as asset if, and only if it is probable
       perolehan aset jika dan hanya jika besar                           that future economic benefits associated with the
       kemungkinan manfaat ekonomis di masa depan                         item will flow to the entity and the cost of the item
       berkenaan dengan aset tersebut akan mengalir                       can be measured reliably.
       ke entitas dan biaya perolehan aset dapat diukur
       secara andal.

       Kecuali tanah dan bangunan, aset tetap yang                        Except for land and buildings, assets are retired
       dihentikan pengakuannya atau yang dijual nilai                     or otherwise disposed of, and their carrying
       tercatatnya dikeluarkan dari kelompok aset tetap,                  amounts are removed from the accounts and any
       keuntungan atau kerugian dari penjualan aset                       resulting gain or loss is reflected in profit or loss.
       tetap tersebut dibukukan dalam laba rugi.

       Aset dalam penyelesaian dinyatakan sebesar                         Construction in progress is stated at cost, which
       biaya perolehan, termasuk biaya pinjaman yang                      includes borrowing costs during construction on
       terjadi selama masa pembangunan yang timbul                        debts incurred to finance the construction. The
       dari utang yang digunakan untuk pembangunan                        accumulated cost is transferred to the respective
                                                           40
Page 44
                                                                                   The original financial statements included herein are in
                                                                                                                 the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                      PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                              NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                    JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                 30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                    ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                   (UNAUDITED)

        aset tersebut. Akumulasi biaya perolehan akan                        property, plant and equipment account when
        dipindahkan ke masing-masing aset tetap yang                         completed and ready for use.
        bersangkutan pada saat selesai dan siap
        digunakan.

   l.   Aset tak berwujud                                             l.     Intangible Assets

        Aset takberwujud lain-lain yang diperoleh secara                     Intangible assets acquired separately are
        terpisah dilaporkan sebesar biaya dikurangi                          reported at cost less accumulated amortization
        akumulasi amortisasi (jika aset takberwujud                          (where they have finite useful lives) and
        tersebut memiliki umur manfaat terbatas) dan                         accumulated impairment losses.
        akumulasi kerugian penurunan nilai.

        Aset takberwujud dengan umur manfaat terbatas                        Intangible assets with finite useful lives are
        diamortisasi dengan dasar garis lurus selama                         amortized on a straight-line basis over their
        estimasi umur manfaat sebagai berikut:                               estimated useful lives as follows:

                                                               Tahun/Years
        Perangkat lunak                                             4                                                       Software

        Suatu     aset     takberwujud         dihentikan                    An intangible asset is derecognized on disposal,
        pengakuannya saat pelepasan, atau ketika tidak                       or when no future economic benefits are
        terdapat ekspektasi manfaat ekonomi masa                             expected from use or disposal. Gains or losses
        depan dari penggunaan atau pelepasan.                                arising from derecognition of an intangible asset,
        Keuntungan atau kerugian yang timbul dari                            measured as the difference between the net
        penghentian pengakuan asset takberwujud,                             disposal proceeds and the carrying amount of the
        diukur sebagai perbedaan antara hasil                                asset, are recognized in profit or loss when the
        pelepasan bersih dan nilai tercatat aset, diakui di                  asset is derecognized.
        laba rugii ketika aset tersebut dihentikan
        pengakuannya.

   m. Aset Lain-lain                                                  m. Other Assets

        Akun-akun yang tidak dapat digolongkan dalam                         Accounts that cannot be classified into current
        aset lancar, investasi, maupun aset tidak                            assets, investment, or intangible assets are
        berwujud disajikan dalam aset lain-lain.                             presented as other assets.

        Beban tangguhan                                                      Deferred expense

        Beban tangguhan berupa hak atas tanah dicatat                        Deferred expense such as land right is recorded
        sebesar biaya perolehan hak atau biaya                               at cost of acquisition or cost of renewal right.
        pembaharuan hak. Semua beban tangguhan                               Deferred expense of right is amortized over
        terkait hak diamortisasi sepanjang umur hukum                        useful life or economic life of land, whichever is
        hak atau umur ekonomis aset tanah, atas                              shorter.
        perbandingan dengan umur yang lebih singkat.

   n.   Aset Tidak Lancar yang Dimiliki untuk Dijual                  n.     Non-current Assets Held for Sale

        Aset tidak lancar (atau kelompok lepasan)                            Non-current assets (or disposal groups)
        diklasifikasi sebagai yang dimiliki untuk dijual                     classified as held for sale are measured at the
        diukur pada nilai yang lebih rendah antara jumlah                    lower of their carrying amount and fair value less
        tercatat dan nilai wajar setelah dikurangi biaya                     cost to sell.
        untuk menjual.

        Aset tidak lancar yang dimiliki untuk dijual (atau                   Non-current assets (or disposal groups) are
        kelompok lepasan) diklasifikasi sebagai dimiliki                     classified as held for sale if their carrying amount
        untuk dijual jika jumlah tercatatnya akan                            will be recovered principally through a sale
        dipulihkan terutama melalui transaksi penjualan                      transaction rather than through continuing use.
        dari pada melalui pemakaian berlanjut. Kondisi                       This condition is regarded as met only when the
        ini dianggap terpenuhi hanya ketika aset (atau                       asset (or disposal group) is available for
        kelompok lepasan) berada dalam keadaan                               immediate sale in its present condition subject
        segera dapat dijual dengan syarat-syarat yang                        only to terms that are usual and customary for

                                                              41
Page 45
                                                                                The original financial statements included herein are in
                                                                                                              the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                      PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                              NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                    JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                 30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                    ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                   (UNAUDITED)

        biasa dan umum yang diperlukan dalam                              sales of such asset (or disposal group) and its
        penjualan aset (atau kelompok lepasan) tersebut                   sale is highly probable. Management must be
        dan penjualannya harus sangat mungkin terjadi.                    committed to the sale, which should be expected
        Manajemen harus memiliki komitmen untuk                           to qualify for recognition as a completed sale
        menjual dan penjualan diharapkan untuk                            within one year from the date of classification.
        diselesaikan dalam waktu satu tahun sejak
        tanggal klasifikasi.

        Kerugian penurunan nilai awal atau selanjutnya                    An impairment loss is recognized for any initial or
        diakui atas penurunan nilai aset (atau kelompok                   subsequent write-down of the asset (or disposal
        lepasan) ke nilai wajar dikurangi dengan biaya                    group) to fair value less costs to sell. A gain is
        untuk menjual aset. Keuntungan diakui atas                        recognized for any subsequent increases in fair
        peningkatan nilai wajar dikurangi biaya untuk                     value less costs to sell of an asset (or disposal
        menjual aset (atau kelompok lepasan), tetapi                      group), but not in excess of any cumulative
        tidak boleh melebihi akumulasi rugi penurunan                     impairment loss previously recognized. A gain or
        nilai yang telah diakui sebelumnya. Keuntungan                    loss not previously recognized by the date of the
        atau kerugian yang sebelumnya tidak diakui                        sale of the noncurrent asset (or disposal group)
        pada tanggal penjualan aset tidak lancar (atau                    is recognized at the date of derecognition.
        kelompok lepasan) diakui pada tanggal
        penghentian pengakuan.

        Aset tidak lancar yang diklasifikasikan sebagai                   Non-current assets classified as held for sale and
        dimiliki untuk dijual dan aset dalam kelompok                     the assets of a disposal group classified as held
        lepasan yang dimiliki untuk dijual disajikan                      for sale are presented separately from the other
        secara terpisah dari aset lainnya dalam laporan                   assets in the statement of financial position. The
        posisi keuangan. Liabilitas dalam kelompok                        liabilities of a disposal group classified as held for
        lepasan yang diklasifikasikan sebagai dimiliki                    sale are presented separately from other
        untuk dijual disajikan secara terpisah dari                       liabilities in the statement of financial position.
        liabilitas lainnya dalam laporan posisi keuangan.

   o.   Penurunan Nilai Aset Non-Keuangan                            o.   Impairment of Non-Financial Assets

        Pada     setiap    akhir   periode     pelaporan,                 At the end of each reporting period, the Company
        Perusahaan menelaah nilai tercatat aset non-                      reviews the carrying amount of non-financial
        keuangan untuk menentukan apakah terdapat                         assets to determine whether there is any
        indikasi bahwa aset tersebut telah mengalami                      indication that those assets have suffered an
        penurunan nilai. Jika terdapat indikasi tersebut,                 impairment loss. If any such indication exists, the
        jumlah terpulihkan dari aset diestimasi untuk                     recoverable amount of the asset is estimated in
        menentukan tingkat kerugian penurunan nilai                       order to determine the extent of the impairment
        (jika ada). Bila tidak memungkinkan untuk                         loss (if any). Where it is not possible to estimate
        mengestimasi jumlah terpulihkan atas suatu aset                   the recoverable amount of an individual asset,
        individual, Perusahaan mengestimasi jumlah                        the Company estimates the recoverable amount
        terpulihkan dari unit penghasil kas atas aset.                    of the cash generating unit to which the asset
                                                                          belongs.

        Estimasi jumlah terpulihkan adalah nilai tertinggi                Estimated recoverable amount is the higher of
        antara     nilai    wajar    dikurangi      biaya                 fair value less cost to sell and value in use. In
        pelepasan/penghapusan dan nilai pakai. Dalam                      assessing value in use, the estimated future cash
        menilai nilai pakainya, estimasi arus kas masa                    flows are discounted to their present value using
        depan didiskontokan ke nilai kini menggunakan                     a pre-tax discount rate that reflects current
        tingkat    diskonto   sebelum     pajak      yang                 market assessments of the time value of money
        menggambarkan penilaian pasar kini dari nilai                     and the risks specific to the asset for which the
        waktu uang dan risiko spesifik atas aset yang                     estimates of future cash flows have not been
        mana estimasi arus kas masa depan belum                           adjusted.
        disesuaikan.

        Dalam menentukan nilai wajar dikurangi biaya                      In determining fair value less costs to sell, recent
        untuk menjual, digunakan harga penawaran                          market transactions are taken into account, if
        pasar terakhir, jika tersedia. Jika tidak terdapat                available. If no such transactions can be
        transaksi tersebut, Grup menggunakan model                        identified, an appropriate valuation model is used
        penilaian yang sesuai untuk menentukan nilai                      to determine the fair value of the assets. These
        wajar    aset.     Perhitungan-perhitungan      ini

                                                              42
Page 46
                                                                               The original financial statements included herein are in
                                                                                                             the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                     PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                             NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                   JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                   ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                  (UNAUDITED)

        dikuatkan oleh penilaian berganda atau indikasi                  calculations are corroborated by valuation
        nilai wajar yang tersedia.                                       multiples or other available fair value indicators.

        Jika jumlah terpulihkan dari aset non-keuangan                   If the recoverable amount of the non-financial
        (unit penghasil kas) lebih kecil dari nilai                      asset (cash generating unit) is less than its
        tercatatnya, nilai tercatat aset (unit penghasil                 carrying amount, the carrying amount of the
        kas) diturunkan menjadi sebesar jumlah                           asset (cash generating unit) is reduced to its
        terpulihkan dan rugi penurunan nilai segera                      recoverable amount and an impairment loss is
        diakui dalam laba rugi, kecuali relevan aset                     recognized immediately in profit or loss, unless
        tersebut dicatat pada jumlah revaluasian, di                     the relevant asset is carried at revaluation
        mana kerugian penurunan nilai diperlakukan                       amount, in which the impairment loss is treated
        sebagai penurunan revaluasi.                                     as revaluation decrease.

        Apabila penurunan nilai selanjutnya dipulihkan,                  When an impairment loss subsequently
        jumlah tercatat aset (atau unit penghasil kas)                   reverses, the carrying amount of the asset (or a
        ditingkatkan ke estimasi yang direvisi dari jumlah               cash-generating unit) is increased to the revised
        terpulihkannya, namun kenaikan jumlah tercatat                   estimate of its recoverable amount, so that the
        tidak boleh melebihi jumlah tercatat yang tidak                  increased carrying amount does not exceed the
        ada kerugian penurunan nilai yang diakui untuk                   carrying amount that would have been
        aset (atau unit penghasil kas) pada tahun-tahun                  determined had no impairment loss been
        sebelumnya. Pembalikan rugi penurunan nilai                      recognized for the asset (or cash-generating unit)
        diakui segera dalam laba rugi, kecuali aset yang                 in prior years. The reversal of an impairment loss
        bersangkutan dicatat pada jumlah revaluasian,                    is recognized immediately in profit or loss, unless
        dalam hal ini pembalikan kerugian penurunan                      the relevant asset is carried at a revalued
        nilai diperlakukan sebagai kenaikan nilai                        amount, in which case the reversal of the
        revaluasi (Catatan 3k).                                          impairment loss is treated as a revaluation
                                                                         increase (Note 3k).

   p.   Utang Bruto kepada Subkontraktor                            p.   Gross Amount Due to Subcontractors

        Utang bruto kepada subkontraktor diakui atas                     Gross amount due to subcontractors is
        dasar akrual yang merupakan utang prestasi                       recognized on accrual basis which represents
        kerja subkontraktor yang belum diberita                          uncertified subcontractor’s working progress,
        acarakan, baik dari subkontraktor atau material                  either from subcontractor or materials which are
        yang diakui sebagai prestasi karena belum                        recognized as progress as it has not fulfilled the
        memenuhi syarat pembayaran sesuai kontrak.                       certain payment condition as stated in the
        Utang bruto kepada subkontraktor disajikan                       contract. Gross amount due to subcontractor is
        sebesar selisih antara biaya yang terjadi                        presented as the difference between actual costs
        ditambah laba atau dikurangi kerugian yang                       plus profit or less realized loss.
        diakui.

   q.   Provisi                                                     q.   Provisions

        Provisi diakui bila Perusahaan memiliki                          Provisions are recognized when the Company
        kewajiban kini (baik bersifat hukum maupun                       has a present obligation (legal or constructive) as
        bersifat konstruktif) sebagai akibat peristiwa                   a result of a past event, it is probable that the
        masa lalu, kemungkinan besar Perusahaan                          Company will be required to settle the obligation,
        diharuskan menyelesaikan kewajiban dan                           and a reliable estimate can be made of the
        estimasi yang andal mengenai jumlah kewajiban                    amount of the obligation.
        tersebut dapat dibuat.

        Jumlah yang diakui sebagai provisi adalah hasil                  The amount recognized as a provision is the best
        estimasi terbaik pengeluaran yang diperlukan                     estimate of the consideration required to settle
        untuk menyelesaikan kewajiban kini pada akhir                    the present obligation at the end of the reporting
        periode pelaporan, dengan mempertimbangkan                       period, taking into account the risks and
        risiko dan ketidakpastian yang meliputi                          uncertainties surrounding the obligation. Where
        kewajibannya. Apabila suatu provisi diukur                       a provision is measured using the cash flows
        menggunakan arus kas yang diperkirakan untuk                     estimated to settle the present obligation, its
        menyelesaikan kewajiban kini, maka nilai                         carrying amount is the present value of those
        tercatatnya adalah nilai kini dari arus kas.                     cash flows.



                                                             43
Page 47
                                                                                  The original financial statements included herein are in
                                                                                                                the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                     PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                             NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                   JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                   ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                  (UNAUDITED)

        Ketika beberapa atau seluruh manfaat ekonomi                     When some or all of the economic benefits
        untuk penyelesaian provisi yang diharapkan                       required to settle a provision are expected to be
        dapat dipulihkan dari pihak ketiga, piutang diakui               recovered from a third party, a receivable is
        sebagai aset apabila terdapat kepastian bahwa                    recognized as an asset if it is virtually certain that
        penggantian akan diterima dan jumlah piutang                     reimbursement will be received and the amount
        dapat diukur secara andal.                                       of the receivable can be measured reliably.

   r.   Pengakuan Pendapatan dan Beban                              r.   Revenue and Expenses Recognition

        Pendapatan diukur berdasarkan imbalan yang                       Revenue is measured based on the
        Perusahaan perkirakan menjadi haknya dalam                       consideration to which the Company expects to
        kontrak dengan pelanggan dan tidak termasuk                      be entitled in a contract with a customer and
        jumlah yang ditagih atas nama pihak ketiga.                      excludes amounts collected on behalf of third
        Perusahaan mengakui pendapatan ketika                            parties. The Company recognizes revenue when
        mengalihkan pengendalian barang atau jasa                        it transfers control of a product or service to a
        kepada pelanggan.                                                customer.

        Dalam menentukan pengakuan pendapatan,                           In determining revenue recognition, the
        Perusahaan melakukan analisa kontrak dengan                      Company performs analysis of contracts with
        konsumen melalui pendekatan lima langkah                         customers through the following five-step
        berikut:                                                         assessment:

        1.   Mengidentifikasi kontrak dengan pelanggan,                  1.   Identify contracts with customers                     with
             dengan kriteria sebagai berikut:                                 certain criteria as follows:

             −   Kontrak telah disetujui oleh pihak-pihak                     −      The contract has been agreed by the
                 terkait dalam kontrak                                               parties involved in the contract
             −   Perusahaan bisa mengidentifikasi hak                         −      The Company can identify the rights of
                 dari pihak-pihak terkait dan jangka                                 relevant parties and the term of
                 waktu pembayaran dari barang atau                                   payment for the goods or services to be
                 jasa yang akan dialihkan                                            transferred
             −   Kontrak memiliki substansi komersial                         −      The contract has commercial substance
             −   Besar kemungkinan entitas akan                               −      It is probable that the Group will receive
                 menerima imbalan atas barang atau                                   benefits for the goods or services
                 jasa yang dialihkan.                                                transferred.

        2.   Mengidentifikasi kewajiban pelaksanaan                      2.   Identify the performance obligations in the
             dalam kontrak, untuk menyerahkan barang                          contract, to transfer distinctive goods or
             atau jasa yang memiliki karakteristik yang                       services to the customer.
             berbeda ke pelanggan.

        3.   Menentukan harga transaksi, setelah                         3.   Determine the transaction price, net of sales
             dikurangi potongan penjualan dan pajak                           discounts and value added tax, which an
             pertambahan nilai, yang berhak diperoleh                         entity expects to be entitled in exchange for
             suatu entitas sebagai kompensasi atas                            transferring promised goods or services to
             diserahkannya barang atau jasa yang                              customer.
             dijanjikan ke pelanggan.

        4.   Mengalokasikan harga transaksi kepada                       4.   Allocate the transaction price to each
             setiap kewajiban pelaksanaan dengan                              performance obligation on the basis of the
             menggunakan dasar harga jual masing-                             stand-alone selling price of each goods or
             masing dari setiap barang atau jasa yang                         services promised in the contract.
             dijanjikan di kontrak.

        5.   Mengakui pendapatan ketika kewajiban                        5.   Recognize revenue when performance
             pelaksanaan telah dipenuhi yaitu dengan                          obligation is satisfied overtime or at a point
             metode sepanjang waktu atau dengan                               in time.
             metode pada suatu waktu tertentu.




                                                             44
Page 48
                                                                               The original financial statements included herein are in
                                                                                                             the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                     PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                             NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                   JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                   ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                  (UNAUDITED)

        Aset Kontrak                                                     Contract assets

        Kontrak aset pada awalnya diakui sebagai                         A contract asset is initially recognized for
        pendapatan yang diperoleh dari jasa yang                         revenue earned from service rendered because
        diberikan    karena    penerimaan       imbalan                  the receipt of consideration is conditional on
        bergantung pada keberhasilan penyelesaian                        successful completion of the service. Upon
        jasa tersebut. Setelah penyelesaian jasa dan                     completion of the service and acceptance by the
        penerimaan oleh pelanggan, jumlah yang diakui                    customer, the amount recognized as contract
        sebagai kontrak aset direklasifikasi ke piutang                  assets is reclassified to trade receivables.
        usaha.

        Liabilitas kontrak                                               Contract liabilities

        Kontrak liabilitas diakui jika pembayaran diterima               A contract liability is recognized if a payment is
        atau pembayaran jatuh tempo (mana yang lebih                     received or a payment is due (whichever is
        awal) dari pelanggan sebelum Perusahaan                          earlier) from a customer before the Company
        mengalihkan barang atau jasa terkait. Kontrak                    transfers the related goods or services. Contract
        liabilitas diakui sebagai pendapatan ketika                      liabilities are recognized as revenue when the
        Perusahaan memenuhi kontrak tersebut (yaitu,                     Company performs under the contract (i.e.,
        mengalihkan kendali atas barang dan jasa terkait                 transfers control of the related goods or services
        kepada pelanggan).                                               to the customer).

        Aset kontrak disajikan dalam tagihan bruto dan                   Contract assets are presented under gross
        liabilitas kontrak disajikan dalam uang muka                     amounts due from customers, and contract
        kepada pelanggan.                                                liabilities are presented under advances from
                                                                         customers.

        Kriteria tertentu juga harus terpenuhi untuk                     The specific criteria also must be met for each of
        setiap aktivitas Perusahaan seperti dijelaskan di                the Company activities as described below:
        bawah:

        −   Pendapatan dari jasa konstruksi diakui                       −    Revenue from construction services are
            dengan metode persentase penyelesaian                             recognized based on the percentage of
            berdasarkan kemajuan fisik proyek pada                            completion method, determined using
            tanggal pelaporan.                                                physical progress of the projects at the
                                                                              reporting date.
        −   Pendapatan dari penjualan beton pracetak,                    −    Revenue from the sale of precast and
            readymix dan baja diakui pada saat                                readymix is recognized when the control of
            pengendalian atas barang telah berpindah                          goods has been transferred to the customer,
            kepada pelanggan yaitu ketika barang telah                        being when the goods have been shipped to
            dikirim ke lokasi spesifik pelanggan.                             the customer’s specific location.

        Beban diakui pada saat terjadinya, dengan                        Expenses are recognized as incurred on an
        menggunakan dasar akrual.                                        accruals basis.

   s.   Biaya Pinjaman                                              s.   Borrowing Costs

        Biaya pinjaman yang dapat diatribusikan                          Borrowing costs that are directly attributable to
        langsung dengan perolehan, pembangunan atau                      the acquisition, construction or production of a
        pembuatan aset kualifikasian, dikapitalisasi                     qualifying asset, are capitalized as part of the
        sebagai bagian biaya perolehan aset tersebut.                    cost of asset. Other borrowing costs are
        Biaya pinjaman lainnya diakui sebagai beban                      recognized as an expense when incurred.
        pada saat terjadi. Biaya pinjaman dapat                          Borrowing costs may include interest expense,
        mencakup beban bunga, beban keuangan dalam                       finance charges in respect of finance leases, or
        sewa pembiayaan atau selisih kurs yang berasal                   exchange differences arising from foreign
        dari pinjaman dalam mata uang asing sepanjang                    currency borrowings to the extent that they are
        selisih kurs tersebut diperlakukan sebagai                       regarded as an adjustment to interest costs.
        penyesuaian atas biaya bunga.

        Penghasilan investasi diperoleh atas investasi                   Investment income earned on the temporary
        sementara dari pinjaman yang secara spesifik                     investment of specific borrowings pending their
        belum digunakan untuk pengeluaran aset                           expenditure on qualifying assets is deducted

                                                             45
Page 49
                                                                               The original financial statements included herein are in
                                                                                                             the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                     PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                             NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                   JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                   ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                  (UNAUDITED)

        kualifikasian dikurangi dari biaya pinjaman yang                 from the borrowing               costs      eligible      for
        dikapitalisasi.                                                  capitalization.

        Kapitalisasi biaya pinjaman dimulai pada saat                    Capitalization of borrowing costs commences
        Perusahaan telah melakukan aktivitas yang                        when the Company undertakes activities
        diperlukan untuk mempersiapkan aset agar                         necessary to prepare the asset for its intended
        dapat digunakan atau dijual sesuai dengan                        use or sale and expenditures for the asset and its
        intensinya serta pengeluaran untuk aset dan                      borrowing     costs     has     been      incurred.
        biaya pinjamannya telah terjadi. Kapitalisasi                    Capitalization of borrowing costs ceases when
        biaya pinjaman dihentikan ketika secara                          substantially all the activities necessary to
        substansial seluruh aktivitas yang diperlukan                    prepare the qualifying assets for its intended use
        untuk mempersiapkan aset kualifikasian agar                      or sale are complete.
        dapat digunakan atau dijual sesuai dengan
        intensinya telah selesai.

   t.   Imbalan Pascakerja                                          t.   Employee Benefits

        Pada bulan April 2022, DSAK-IAI menerbitkan                      In April 2022, DSAK-IAI issued an explanatory
        materi penjelasan melalui siaran pers atas                       material through a press release regarding
        persyaratan pengatribusian imbalan pada                          attribution of benefits to periods of service in
        periode jasa sesuai PSAK 24: Imbalan Kerja                       accordance with PSAK 24: Imbalan Kerja which
        yang diadopsi dari IAS 19 Employee Benefits.                     was adopted from IAS 19: Employee Benefits.
        Materi penjelasan tersebut menyampaikan                          The explanatory material conveyed the
        informasi bahwa pola fakta umum dari program                     information that the fact pattern of the pension
        pensiun         berbasis         Undang-undang                   program based on the Labor Law currently
        Ketenagakerjaan yang berlaku di Indonesia saat                   enacted in Indonesia is similar to those
        ini memiliki pola fakta serupa dengan yang                       responded and concluded in the IFRS
        ditanggapi dan disimpulkan dalam IFRS                            Interpretation Committee (“IFRIC”) Agenda
        Interpretation Committee (“IFRIC”) Agenda                        Decision Attributing Benefit to Periods of Service
        Decision Attributing Benefit to Periods of Service               (IAS 19).
        (IAS 19).

        Perusahaan     telah   menerapkan     materi                     The Company has implemented the said
        penjelasan tersebut dan, dengan demikian,                        explanatory material and accordingly, changed
        mengubah kebijakan akuntansi mengenai                            its accounting policy regarding attribution of
        atribusi imbalan kerja pada periode jasa.                        benefits   to  periods    of   service.    The
        Penerapan ini tidak berdampak material                           implementation has no material impact on the
        terhadap jumlah yang dilaporkan pada periode                     amounts reported for the previous financial
        keuangan sebelumnya.                                             periods.

        Perusahaan mengakui kewajiban imbalan kerja                      The Company recognized unfunded employee
        yang tidak didanai sesuai dengan Peraturan                       benefits liability in accordance with Government
        Pemerintah No. 35 Tahun 2021 (PP 35/2021)                        Regulation Number 35 Year 2021 (PP 35/2021)
        yang     menerapkan      pengaturan     Perppu                   that implement the provisions of Perppu
        No. 2/2022 tentang Cipta Kerja pada tahun 2022                   No. 2/2022 on Job Creation in 2022 and Law
        dan Undang-undang No. 11/2020 tentang Cipta                      No. 11/2020 on Job Creation in 2021. Pension
        Kerja pada tahun 2021. Beban pensiun                             costs under the Company’s defined benefit
        berdasarkan program dana pensiun manfaat                         pension plans are determined by periodic
        pasti Perusahaan ditentukan melalui perhitungan                  actuarial calculation using the projected-unit-
        aktuaria secara periodik dengan menggunakan                      credit method and applying the assumptions on
        metode projected-unit credit dan menerapkan                      discount rate and annual rate of increase in
        asumsi atas tingkat diskonto dan tingkat                         compensation.
        kenaikan manfaat pasti pensiun tahunan.

        Perusahaan mengakui jumlah liabilitas imbalan                    The Company recognizes the amount of the net
        pasti neto sebesar nilai kini kewajiban imbalan                  defined benefit liability at the present value of the
        pasti pada akhir periode pelaporan dikurangi nilai               defined benefit obligation at the end of the
        wajar aset program yang dihitung oleh aktuaris                   reporting which is calculated by independent
        independen dengan menggunakan metode                             actuary using the Projected Unit Credit method.
        Projected Unit Credit. Nilai kini kewajiban                      Present value of the benefit obligation is
        imbalan       pasti      ditentukan      dengan                  determined by discounting the benefit.
        mendiskontokan imbalan tersebut.

                                                             46
Page 50
                                                                               The original financial statements included herein are in
                                                                                                             the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                      PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                              NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                    JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                 30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                    ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                   (UNAUDITED)


       Perusahaan mencatat tidak hanya kewajiban                         The Company not only records for its legal
       hukum berdasarkan persyaratan formal program                      obligation under the formal terms of a defined
       imbalan pasti, tetapi juga kewajiban konstruktif                  benefit plan, but also for any constructive
       yang timbul dari praktik informal entitas.                        obligation that arises from the entity’s informal
                                                                         practices.

       Biaya jasa kini, biaya jasa lalu dan keuntungan                   Current service cost, past service cost and gain
       atau kerugian atas penyelesaian, serta bunga                      or loss on settlement, and net interest on the net
       neto atas liabilitas imbalan pasti neto diakui                    defined benefit liability are recognized in profit or
       dalam laba rugi.                                                  loss.

       Pengukuran kembali atas liabilitas imbalan pasti                  The remeasurement of the net defined benefit
       neto yang terdiri dari keuntungan dan kerugian                    liabilities comprises actuarial gains and losses
       aktuarial     diakui      sebagai      penghasilan                are recognized in other comprehensive income.
       komprehensif lain. Pengukuran kembali diakui                      Remeasurements           recognized      in     other
       dalam penghasilan komprehensif lain tercermin                     comprehensive          income      are      reflected
       segera dalam ”saldo laba” dan tidak tidak                         immediately in “retained earnings” and are not
       direklasifikasi ke laba rugi. Biaya jasa lalu diakui              reclassified to profit and loss. Past service cost is
       dalam laba rugi ketika terjadi amandemen                          recognized in profit or loss when the plan
       program      atau     kurtailmen,    atau     ketika              amendment or curtailment occurs, or when the
       Perusahaan mengakui biaya restrukturisasi                         Company recognizes related restructuring costs
       terkait atau pesangon, jika lebih dahulu. Bunga                   or termination benefits, if earlier. Net interest is
       neto dihitung dengan mengalikan tingkat                           calculated by applying a discount rate to the net
       diskonto dengan liabilitas atau aset imbalan pasti                defined benefit liability. Defined benefit costs are
       neto. Biaya imbalan pasti dibagi menjadi                          categorized as follows:
       beberapa kategori berikut:

       •   Biaya jasa (termasuk biaya jasa kini, biaya                   •    Service cost (including current service cost,
           jasa lalu serta keuntungan dan kerugian                            past service cost, as well as gains and
           kurtailmen dan penyelesaian).                                      losses on curtailments and settlements).
       •   Beban atau pendapatan bunga neto.                             •    Net interest expense or income.
       •   Pengukuran kembali.                                           •    Remeasurement.

       Pesangon                                                          Termination Benefits

       Perusahaan mengakui pesangon sebagai                              The Company recognizes liability and expense
       liabilitas dan beban pada tanggal yang lebih awal                 for termination benefits at the earlier of the
       di antara:                                                        following dates:

       (a) Ketika Perusahaan tidak dapat lagi menarik                    (a) When the Company no longer can withdraw
           tawaran atas imbalan tersebut; atau                               the offer of those benefits; or
       (b) Ketika Perusahaan mengakui biaya untuk                        (b) When the Company recognizes costs for a
           restrukturisasi yang berada dalam ruang                           restructuring within the scope of PSAK No.
           lingkup PSAK No. 57 dan melibatkan                                57 and involves payment of termination
           pembayaran pesangon.                                              benefits.

       Perusahaan mengukur pesangon pada saat                            The Company measures termination benefits on
       pengakuan awal, dan mengukur dan mengakui                         initial recognition, and measures and recognizes
       perubahan selanjutnya, sesuai dengan sifat                        subsequent changes, in accordance with the
       imbalan kerja.                                                    nature of the employee benefits.

       Imbalan Kerja Jangka Panjang Lainnya                              Other Long-Term Employee Benefits

       Perusahaan memberikan imbalan kerja jangka                        The Company provides other long-term
       panjang lainnya seperti penghargaan kerja dan                     employee benefits such as service award and
       cuti panjang, kepada para karyawan kuncinya.                      long service leave, to its key employees. The
       Biaya untuk menyediakan imbalan ini ditetapkan                    cost of providing this benefit is determined using
       dengan menggunakan metode Projected Unit                          the Projected Unit Credit method. This method
       Credit. Metode ini merefleksikan jasa yang                        reflects service rendered by employees to the
       diserahkan oleh karyawan hingga tanggal                           date of valuation and incorporates assumptions
       penilaian dan memperhitungkan asumsi terkait                      concerning employees’ projected salaries. Other
                                                              47
Page 51
                                                                              The original financial statements included herein are in
                                                                                                            the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                    PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                            NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                  JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                               30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                  ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                 (UNAUDITED)

        proyeksi gaji karyawan. Imbalan kerja jangka                    long-term employee benefit expense includes
        panjang lainnya termasuk biaya jasa kini, biaya                 current service cost, interest cost, past service
        bunga, biaya jasa lalu dan pengakuan                            costs and recognition of actuarial gains and
        keuntungan dan kerugian aktuarial. Keuntungan                   losses. The actuarial gains and losses and past
        dan kerugian aktuarial dan biaya jasa lalu diakui               service costs are recognized immediately in the
        dalam laba rugi tahun berjalan.                                 current year’s profit or loss.

   u.   Pajak Penghasilan                                          u.   Income Tax

        Beban pajak penghasilan merupakan jumlah                        Income tax expense represents the sum of the
        pajak yang terutang dan pajak tangguhan.                        tax currently payable and deferred tax.

        Pajak Kini                                                      Current Tax

        Pajak saat terutang berdasarkan laba kena pajak                 The tax currently payable is based on taxable
        untuk suatu tahun. Laba kena pajak berbeda dari                 profit for the year. Taxable profit differs from profit
        laba sebelum pajak seperti yang dilaporkan                      before tax as reported in the statement of profit
        dalam laporan laba rugi dan penghasilan                         or loss and other comprehensive income
        komprehensif lain karena pos pendapatan atau                    because of items of income or expense that are
        beban yang dikenakan pajak atau dikurangkan                     taxable or deductible in other years and items
        pada tahun berbeda dan pos-pos yang tidak                       that are never taxable or deductible.
        pernah dikenakan pajak atau tidak dapat
        dikurangkan.

        Beban pajak kini dihitung dengan menggunakan                    Current tax expense is calculated using tax rates
        tarif pajak yang berlaku pada tanggal pelaporan                 that have been enacted or substantively enacted
        keuangan, dan ditetapkan berdasarkan taksiran                   at end of the reporting period, and is provided
        laba kena pajak tahun berjalan. Manajemen                       based on the estimated taxable income for the
        secara periodik mengevaluasi posisi yang                        year. Management periodically evaluates
        dilaporkan di Surat Pemberitahuan Tahunan                       positions taken in tax returns with respect to
        (SPT) sehubungan dengan situasi di mana                         situations in which applicable tax regulation is
        aturan pajak yang berlaku membutuhkan                           subject to interpretation. It establishes provision
        interpretasi. Jika perlu, manajemen menentukan                  where appropriate on the basis of amounts
        provisi berdasarkan jumlah yang diharapkan                      expected to be paid to the tax authorities.
        akan dibayar kepada otoritas pajak.

        Provisi diakui untuk penentuan pajak yang tidak                 A provision is recognized for those matters for
        pasti,   tetapi kemungkinan      besar akan                     which the tax determination is uncertain but it is
        mengakibatkan arus keluar dana kepada otoritas                  considered probable that there will be a future
        pajak. Provisi diukur sebesar estimasi terbaik                  outflow of funds to a tax authority. The provisions
        atas jumlah ekspektasian yang terhutang.                        are measured at the best estimate of the amount
        Penilaian berdasarkan pada pertimbangan                         expected to become payable. The assessment is
        professional pajak dalam Perusahaan yang                        based on the judgement of tax professionals
        didukung dengan pengalaman lalu atas aktivitas                  within the Company supported by previous
        tersebut dan dalam kasus tertentu berdasarkan                   experience in respect of such activities and in
        saran pakar pajak independen.                                   certain cases based on specialist independent
                                                                        tax advice.

        Pajak Tangguhan                                                 Deffered Tax

        Pajak tangguhan diakui atas perbedaan                           Deferred tax is recognized on temporary
        temporer antara jumlah tercatat aset dan                        differences between the carrying amounts of
        liabilitas dalam laporan keuangan dengan dasar                  assets and liabilities in the financial statements
        pengenaan pajak yang digunakan dalam                            and the corresponding tax bases used in the
        perhitungan laba kena pajak. Liabilitas pajak                   computation of taxable profit. Deferred tax
        tangguhan umumnya diakui untuk seluruh                          liabilities are generally recognized for all taxable
        perbedaan temporer kena pajak. Aset pajak                       temporary differences. Deferred tax assets are
        tangguhan umumnya diakui untuk seluruh                          generally recognized for all deductible temporary
        perbedaan temporer yang dapat dikurangkan                       differences to the extent that it is probable that
        sepanjang kemungkinan besar bahwa laba kena                     taxable profits will be available against which
        pajak akan tersedia sehingga perbedaan                          those deductible temporary differences can be
        temporer dapat dimanfaatkan. Aset dan liabilitas                utilized. Such deferred tax assets and liabilities
        pajak tangguhan tidak diakui jika perbedaan                     are not recognized if the temporary difference
                                                            48
Page 52
                                                                              The original financial statements included herein are in
                                                                                                            the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                    PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                            NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                  JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                               30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                  ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                 (UNAUDITED)

       temporer timbul dari pengakuan awal (bukan                       arises from the initial recognition (other than in a
       kombinasi bisnis) dari aset dan liabilitas suatu                 business combination) of assets and liabilities in
       transaksi yang tidak mempengaruhi laba kena                      a transaction that affects neither the taxable profit
       pajak atau laba akuntansi.                                       nor the accounting profit.

       Aset dan liabilitas pajak tangguhan diukur                       Deferred tax assets and liabilities are measured
       dengan menggunakan tarif pajak yang                              at the tax rates that are expected to apply in the
       diharapkan berlaku dalam periode ketika                          period in which the liability is settled or the asset
       liabilitas diselesaikan atau aset dipulihkan                     realized, based on the tax rates (and tax laws)
       berdasarkan tarif pajak (dan peraturan pajak)                    that have been enacted, or substantively
       yang telah berlaku atau secara substantif telah                  enacted, by the end of the reporting period.
       berlaku pada akhir periode pelaporan.

       Pengukuran aset dan liabilitas pajak tangguhan                   The measurement of deferred tax assets and
       mencerminkan konsekuensi pajak yang sesuai                       liabilities reflects the tax consequences that
       dengan cara Perusahaan memperkirakan, pada                       would follow from the manner in which the
       akhir periode pelaporan, untuk memulihkan atau                   Company expects, at the end of the reporting
       menyelesaikan jumlah tercatat aset dan                           period, to recover or settle the carrying amount of
       liabilitasnya.                                                   its assets and liabilities.

       Jumlah tercatat aset pajak tangguhan ditelaah                    The carrying amount of deferred tax asset is
       ulang pada akhir periode pelaporan dan                           reviewed at the end of each reporting period and
       dikurangi jumlah tercatatnya jika kemungkinan                    reduced to the extent that it is no longer probable
       besar laba kena pajak tidak lagi tersedia dalam                  that sufficient taxable profits will be available to
       jumlah        yang       memadai          untuk                  allow all or part of the asset to be recovered.
       mengkompensasikan sebagian atau seluruh
       aset pajak tangguhan tersebut.

       Pajak kini dan pajak tangguhan diakui sebagai                    Current and deferred tax are recognized as an
       beban atau penghasilan dalam laba rugi periode,                  expense or income in profit or loss, except when
       kecuali sepanjang pajak penghasilan yang timbul                  they relate to items that are recognized outside
       dari transaksi atau peristiwa yang diakui, di luar               of profit or loss (whether in other comprehensive
       laba rugi (baik dalam penghasilan komprehensif                   income or directly in equity).
       lain maupun secara langsung di ekuitas).

       Aset dan liabilitas pajak tangguhan saling hapus                 Deferred tax assets and liabilities are offset when
       ketika entitas memiliki hak yang dapat                           there is legally enforceable right to set off current
       dipaksakan secara hukum untuk melakukan                          tax assets against current tax liabilities and when
       saling hapus aset pajak kini terhadap liabilitas                 there is an intention to settle its current tax assets
       pajak kini dan ketika memiliki intensi untuk                     and current tax liabilities on a net basis, or to
       memulihkan aset dan liabilitas pajak kini dengan                 realize the assets and settle the liabilities
       dasar neto, atau merealisasikan aset dan                         simultaneously, in each future period in which
       menyelesaikan liabilitas secara bersamaan,                       significant amounts of deferred tax liabilities or
       pada setiap periode masa depan dimana jumlah                     assets are expected to be settled or recovered.
       signifikan atas aset atau liabilitas pajak
       tangguhan diharapkan untuk diselesaikan atau
       dipulihkan.

  v.   Laba per Saham                                              v.   Earnings per Share

       Laba per saham dasar dihitung dengan membagi                     Basic earnings per share is computed by dividing
       laba bersih yang diatribusikan kepada pemilik                    profit attributable to the owners of the Company
       entitas induk dengan jumlah rata-rata tertimbang                 by the weighted average number of shares
       saham yang beredar pada tahun yang                               outstanding during the year.
       bersangkutan.

       Laba per saham dilusian dihitung dengan                          Diluted earnings per share is computed by
       membagi laba bersih yang diatribusikan kepada                    dividing profit attributable to the owners of the
       pemilik entitas induk dengan jumlah rata-rata                    Company by the weighted average number of
       tertimbang saham biasa yang telah disesuaikan                    shares outstanding as adjusted for the effects of
       dengan dampak dari semua efek berpotensi                         all dilutive potential ordinary shares.
       saham biasa yang dilutif.


                                                            49
Page 53
                                                                               The original financial statements included herein are in
                                                                                                             the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                     PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                             NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                   JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                   ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                  (UNAUDITED)

        Jika jumlah saham biasa atau instrumen                           If the number of ordinary or potential ordinary
        keuangan berpotensi saham biasa yang beredar                     shares outstanding increases as a result of a
        meningkat sebagai akibat dari kapitalisasi,                      capitalization, bonus issue or share split, or
        penerbitan saham bonus atau pemecahan                            decreases as a result of a reverse share split, the
        saham, atau menurun sebagai akibat dari                          calculation of basic and diluted earnings per
        penggabungan saham, perhitungan laba per                         share for all periods presented shall be adjusted
        saham dasar dan dilusian untuk seluruh periode                   retrospectively.
        yang disajikan harus disesuaikan secara
        retrospektif.

   w. Biaya Emisi Obligasi dan Saham                                w. Bond and Shares Issuance Costs

        Biaya emisi obligasi merupakan biaya transaksi                   Bond issuance costs are transaction costs to be
        yang harus dikurangkan langsung dari hasil                       deducted from the proceeds in order to
        emisi dalam rangka menentukan hasil emisi                        determine the net proceeds of bonds. The
        bersih obligasi. Selisih antara hasil emisi bersih               difference between the net proceeds and the
        dengan nilai nominal merupakan diskonto atau                     nominal value is a discount or premium and will
        premium dan diamortisasi selama jangka waktu                     be amortized over the term of the bonds.
        obligasi yang bersangkutan.

        Biaya emisi saham disajikan sebagai bagian                       Share issuance costs are deducted from
        tambahan modal disetor dan tidak diamortisasi.                   additional paid-in capital and not amortized.

   x.   Informasi Segmen                                            x.   Segment Information

        Segmen operasi diidentifikasi berdasarkan                        Operating segments are identified on the basis of
        laporan internal mengenai komponen dari                          internal reports about components of the
        Perusahaan yang secara regular ditelaah oleh                     Company that are regularly reviewed by the chief
        “pengambil keputusan operasional” dalam                          operating decision maker in order to allocate
        rangka mengalokasikan sumber daya dan                            resources to the operating segments and to
        menilai kinerja segmen operasi.                                  assess their performances.
        Segmen operasi adalah suatu komponen dari                        An operating segment is a component of an
        entitas:                                                         entity:

        a.   yang terlibat dalam aktivitas bisnis yang                   a.   that engages in business activities from
             mana memperoleh pendapatan             dan                       which it may earn revenues and incurred
             menimbulkan beban (termasuk pendapatan                           expenses (including revenues and expenses
             dan beban terkait dengan transaksi dengan                        relating to the transactions with other
             komponen lain dari entitas yang sama);                           components of the same entity);
        b.   yang hasil operasinya dikaji ulang secara                   b.   whose operating results are reviewed
             regular    oleh    pengambil     keputusan                       regularly by the entity’s chief operating
             operasional untuk membuat keputusan                              decision maker to make decision about
             tentang sumber daya yang dialokasikan                            resources to be allocated to the segments
             pada segmen tersebut dan menilai                                 and assess its performance; and
             kinerjanya; dan
        c.   dimana tersedia informasi keuangan yang                     c.   for which discrete financial information is
             dapat dipisahkan.                                                available.

        Informasi yang digunakan oleh pengambil                          Information reported to the chief operating
        keputusan operasional dalam rangka alokasi                       decision maker for the purpose of resource
        sumber daya dan penilaian kinerja mereka                         allocation and assessment of performance is
        terfokus pada kategori dari setiap produk.                       more specifically focused on the category of each
                                                                         product.

   y.   Sewa                                                        y.   Leases

        Perusahaan sebagai penyewa                                       The Company as lessee

        Perusahaan menilai apakah sebuah kontrak                         The Company assesses whether a contract is or
        mengandung sewa, pada tanggal insepsi                            contains a lease, at the inception of the contract.
        kontrak. Perusahaan mengakui aset hak-guna                       The Company recognizes a right-of-use asset
        dan liabilitas sewa terkait sehubungan dengan                    and a corresponding lease liability with respect to

                                                             50
Page 54
                                                                           The original financial statements included herein are in
                                                                                                         the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                  PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                          NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                             30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                               (UNAUDITED)

       seluruh kesepakatan sewa dimana Perusahaan                    all lease arrangements in which it is the lessee,
       merupakan penyewa, kecuali untuk sewa                         except for short-term leases (defined as leases
       jangka-pendek (yang didefinisikan sebagai sewa                with a lease term of 12 months or less) and
       yang memiliki masa sewa 12 bulan atau kurang)                 leases of low value assets. For these leases, the
       dan sewa yang aset pendasarnya bernilai-                      Company recognizes the lease payments as an
       rendah. Untuk sewa-sewa tersebut, Perusahaan                  operating expense on a straight-line basis over
       mengakui pembayaran sewa sebagai beban                        the term of the lease unless another systematic
       operasi secara garis lurus selama masa sewa                   basis is more representative of the time pattern
       kecuali   dasar    sistematis   lainnya   lebih               in which economic benefits from the leased
       merepresentasikan pola konsumsi manfaat                       assets are consumed.
       penyewa dari aset sewa.

       Liabilitas sewa awalnya diukur pada nilai kini                The lease liability is initially measured at the
       pembayaran sewa masa depan yang belum                         present value of the lease payments that are not
       dibayarkan pada tanggal permulaan, yang                       paid at the commencement date, discounted by
       didiskontokan menggunakan suku bunga implisit                 using the rate implicit in the lease. If this rate
       dalam sewa. Jika suku bunga ini tidak dapat                   cannot be readily determined, the Company uses
       ditentukan, Perusahaan menggunakan suku                       the incremental borrowing rate specific to the
       bunga pinjaman inkremental khusus untuk                       lessee.
       penyewa.

       Pembayaran sewa yang diperhitungkan dalam                     Lease payments included in the measurement of
       pengukuran liabilitas sewa terdiri atas:                      the lease liability comprise:

       •   Pembayaran tetap (termasuk pembayaran                     •   Fixed lease payments (including in-
           tetap secara-substansi), dikurangai insentif                  substance fixed payments), less any lease
           sewa;                                                         incentives;
       •   Pembayaran      sewa        variabel   yang               •   Variable lease payments that depend on an
           bergantung pada indeks atau suku bunga                        index or rate, initially measured using the
           yang pada awalnya diukur dengan                               index or rate at the commencement date;
           menggunakan indeks atau suku bunga pada
           tanggal permulaan;
       •   Jumlah yang diperkirakan akan dibayarkan                  •   The amount expected to be payable by the
           oleh penyewa dalam jaminan nilai residual;                    lessee under residual value guarantees;
       •   Harga eksekusi opsi beli jika penyewa cukup               •   The exercise price of purchase options, if the
           pasti untuk mengeksekusi opsi tersebut; dan                   lessee is reasonably certain to exercise the
                                                                         options; and
       •   Pembayaran penalti karena penghentian                     •   Payments of penalties for terminating the
           sewa, jika masa sewa merefleksikan                            lease, if the lease term reflects the exercise
           penyewa    mengeksekusi   opsi  untuk                         of an option to terminate the lease.
           menghentikan sewa.

       Liabilitas sewa disajikan sebagai pos terpisah                The lease liability is presented as a separate line
       dalam laporan posisi keuangan.                                in the statement of financial position.

       Liabilitas sewa selanjutnya diukur dengan                     The lease liability is subsequently measured by
       meningkatkan     jumlah      tercatat  untuk                  increasing the carrying amount to reflect the
       mereflesikan bunga atas liabilitas sewa                       interest on the lease liability (using the effective
       (menggunakan metode suku bunga efektif) dan                   interest method) and by reducing the carrying
       dengan mengurangi jumlah tercatat untuk                       amount to reflect the lease payments made.
       merefleksikan sewa yang telah dibayar.

       Perusahaan mengukur kembali liabilitas sewa                   The Company remeasures the lease liability (and
       (dan melakukan penyesuaian terkait terhadap                   makes a corresponding adjustment to the related
       aset hak-guna) jika:                                          right-of-use assets) whenever:

       •   Terdapat perubahan dalam masa sewa atau                   •   The lease term has changed or there is a
           perubahan dalam penilaian atas eksekusi                       change in the assessment of the exercise of
           opsi pembelian, di mana liabilitas sewa                       a purchase option, in which case the lease
           diukur       dengan        mendiskontokan                     liability is remeasured by discounting the
           pembayaran sewa revisian menggunakan                          revised lease payments using a revised
           tingkat diskonto revisian;                                    discount rate;

                                                          51
Page 55
                                                                             The original financial statements included herein are in
                                                                                                           the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                    PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                            NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                  JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                               30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                  ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                 (UNAUDITED)

       •   Terdapat perubahan sewa masa depan                          •   The lease payments change due to changes
           sebagai akibat dari perubahan indeks atau                       in an index or rate or a change in expected
           perubahan       perkiraan      pembayaran                       payment under a guaranteed residual value,
           berdasarkan nilai residual jaminan di mana                      in which cases the lease liability is
           liabilitas sewa diukur kembali dengan                           remeasured by discounting the revised
           mendiskontokan pembayaran sewa revisian                         lease payments using the initial discount
           menggunakan tingkat diskonto awal (kecuali                      rate (unless the lease payments change is
           jika pembayaran sewa berubah karena                             due to a change in a floating interest rate, in
           perubahan suku bunga mengambang, di                             which case a revised discount rate is used);
           mana tingkat diskonto revisian digunakan);                      or;
           atau;
       •   Kontrak sewa dimodifikasi dan modifikasi                    •   A lease contract is modified and the lease
           sewa tidak dicatat sebagai sewa terpisah, di                    modification is not accounted for as a
           mana liabilitas sewa diukur dengan                              separate lease, in which case the lease
           mendiskontokan pembayaran sewa revisian                         liability is remeasured by discounting the
           menggunakan tingkat diskonto revisian.                          revised lease payments using a revised
                                                                           discount rate.

       Aset hak-guna terdiri dari pengukuran awal atas                 The right-of-use assets comprise the initial
       liabilitas sewa, pembayaran sewa yang                           measurements of the corresponding lease
       dilakukan pada saat atau sebelum permulaan                      liability, lease payments made at or before the
       sewa dan biaya langsung awal. Aset hak-guna                     commencement day and any initial direct costs.
       selanjutnya diukur sebesar biaya dikurangi                      They are subsequently measured at cost less
       akumulasi penyusutan dan kerugian penurunan                     accumulated depreciation and impairment
       nilai.                                                          losses.
       Jika Perusahaan dibebankan kewajiban atas                       Whenever the Company incurs an obligation for
       biaya membongkar dan memindahkan aset                           costs to dismantle and remove a leased asset,
       sewa, merestorasi tempat di mana aset berada                    restore the site on which it is located or restore
       atau merestorasi aset pendasar ke kondisi yang                  the underlying assets to the conditions required
       disyaratkan oleh syarat dan ketentuan sewa,                     by the terms and conditions of the lease, a
       provisi diakui dan diukur sesuai PSAK 57. Biaya                 provision is recognized and measured under
       tersebut diperhitungkan dalam aset hak-guna                     PSAK 57. The costs are included in the related
       terkait, kecuali jika biaya tersebut terjadi untuk              right-of-use asset unless those costs are incurred
       memproduksi persediaan.                                         to produce inventories.
       Aset hak-guna disusutkan selama periode yang                    Right-of-use assets are depreciated over the
       lebih singkat antara masa sewa dan masa                         shorter period of lease term and useful life of the
       manfaat aset pendasar. Jika sewa mengalihkan                    underlying assets. If a lease transfers ownership
       kepemilikan aset pendasar atau jika biaya                       of the underlying assets or the cost of the right-
       perolehan    aset   hak-guna    merefleksikan                   of-use assets reflects that of the Company
       Perusahaan akan mengeksekusi opsi beli, aset                    expects to exercise a purchase option, the
       hak-guna disusutkan selama masa manfaat aset                    related right-of-use asset is depreciated over the
       pendasar. Penyusutan dimulai pada tanggal                       useful life of the underlying assets. The
       permulaan sewa.                                                 depreciation starts at the commencement date of
                                                                       the lease.

       Aset hak-guna disajikan sebagai pos terpisah di                 The right-of-use assets are presented as a
       laporan posisi keuangan.                                        separate line in the statement of financial
                                                                       position.

       Perusahaan menerapkan PSAK 48 untuk                             The Company applies PSAK 48 to determine
       menentukan apakah aset hak-guna mengalami                       whether a right-of-use asset is impaired and
       penurunan nilai dan mencatat kerugian                           accounts for any identified impairment loss as
       penurunan nilai yang teridentifikasi sebagaimana                described in the impairment of non-financial
       dijelaskan dalam kebijakan penurunan nilai aset                 assets policy.
       non-keuangan.

       Sewa variabel yang tidak bergantung pada                        Variable rents that do not depend on an index or
       indeks atau suku bunga tidak diperhitungkan                     rate are not included in the measurements of the
       dalam pengukuran liabilitas sewa dan aset hak-                  lease liability and the right-of-use asset. The
       guna. Pembayaran terkait diakui sebagai beban                   related payments are recognized as an expense
       dalam periode di mana peristiwa atau kondisi                    in the period in which the event or condition that
       yang memicu pembayaran tersebut terjadi dan                     triggers those payments occur and are included
       dicatat dalam pos "Beban umum dan                               in the line "General and administrative expenses"
                                                            52
Page 56
                                                                                   The original financial statements included herein are in
                                                                                                                 the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                      PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                              NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                    JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                 30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                    ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                   (UNAUDITED)

          administrasi" dalam laporan laba rugi dan                          in the statement of profit or loss and other
          penghasilan komprehensif lain.                                     comprehensive income.

          Sebagai cara praktis, PSAK 73 mengijinkan                          As a practical expedient, PSAK 73 permits a
          penyewa untuk tidak memisahkan komponen                            lessee not to separate non-lease components,
          nonsewa,     dan    mencatat   masing-masing                       and instead account for any lease and
          komponen sewa dan komponen nonsewa                                 associated non-lease components as a single
          sebagai kesepakatan sewa tunggal. Perusahaan                       arrangement. The Company has not used this
          tidak menggunakan cara praktis ini. Untuk                          practical expedient. For contracts that contain a
          kontrak yang memiliki komponen sewa dan satu                       lease component and one or more additional
          atau lebih sewa tambahan atau komponen non                         lease or non-lease components, the Company
          sewa, Perusahaan mengalokasikan imbalan                            allocates the consideration in the contract to
          dalam kontrak ke setiap komponen sewa dengan                       each lease component on the basis of the
          dasar harga jual relatif berdiri sendiri dari                      relative stand-alone price of the lease component
          komponen sewa dan jumlah agregat masing-                           and the aggregate stand-alone price of the non-
          masing dari komponen non sewa.                                     lease components.

     z.   Peristiwa Setelah Periode Pelaporan                           z.   Events after the Reporting Period

          Peristiwa setelah periode pelaporan yang                           Events after the reporting period that provide
          memberikan informasi tambahan tentang posisi                       additional information about the Company’s
          Perusahaan      pada     periode     pelaporan                     position at the reporting period (adjusting events)
          (menyesuaikan peristiwa) tercermin dalam                           are reflected in the financial statements. Events
          laporan keuangan. Peristiwa setelah periode                        after the reporting period that are not adjusting
          pelaporan yang tidak menyesuaikan peristiwa,                       events, if any, are disclosed when material to the
          jika ada, diungkapkan ketika material terhadap                     financial statements.
          laporan keuangan.

4.   PERTIMBANGAN AKUNTANSI PENTING DAN                            4.   CRITICAL ACCOUNTING JUDGEMENTS AND
     SUMBER KETIDAKPASTIAN ESTIMASI                                     KEY SOURCES OF ESTIMATION UNCERTAINTY

     Dalam penerapan kebijakan akuntansi Perusahaan,                    In the application of the Company’s accounting
     yang dijelaskan dalam Catatan 3, Direksi diwajibkan                policies, which are described in Note 3, the Directors
     untuk membuat pertimbangan, estimasi dan asumsi                    are required to make judgments, estimates and
     tentang jumlah tercatat aset dan liabilitas yang tidak             assumptions about the carrying amounts of assets
     tersedia dari sumber lain. Estimasi dan asumsi yang                and liabilities that are not readily apparent from other
     terkait didasarkan pada pengalaman historis dan                    sources. The estimates and associated assumptions
     faktor-faktor lain yang dianggap relevan. Hasil                    are based on historical experience and other factors
     aktualnya mungkin berbeda dari estimasi tersebut.                  that are considered to be relevant. Actual results may
                                                                        differ from these estimates.

     Estimasi dan asumsi yang mendasari ditelaah secara                 The estimates and underlying assumptions are
     berkelanjutan. Revisi estimasi akuntansi diakui dalam              reviewed on an ongoing basis. Revisions to
     periode yang perkiraan tersebut direvisi jika revisi               accounting estimates are recognized in the period
     hanya mempengaruhi periode itu, atau pada periode                  which the estimate is revised if the revision affects
     revisi dan periode masa depan jika revisi                          only that period, or in the period of the revision and
     mempengaruhi kedua periode saat ini dan masa                       future periods if the revision affects both current and
     depan.                                                             future periods.

     Pertimbangan Kritis dalam Penerapan Kebijakan                      Critical Judgments           in   Applying        Accounting
     Akuntansi                                                          Policies

     Dalam proses penerapan kebijakan akuntansi                         In the process of applying the Company’s accounting
     Perusahaan, manajemen telah membuat keputusan                      policies, management has made the following
     berikut, yang memiliki pengaruh paling signifikan                  judgment, which has the most significant effect on the
     terhadap jumlah yang diakui dalam laporan                          amounts recognized in the financial statements:
     keuangan:

     Kelangsungan Usaha                                                 Going Concern

     Manajemen Perusahaan telah melakukan penilaian                     The Company’s management has made an
     terhadap   kemampuan      Perusahaan    untuk                      assessment of the Company’s ability to continue as a
     mempertahankan kelangsungan usaha dan menilai                      going concern and is satisfied that the Company has

                                                              53
Page 57
                                                                               The original financial statements included herein are in
                                                                                                             the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                     PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                             NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                   JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                   ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                  (UNAUDITED)

   keyakinan bahwa Perusahaan memiliki sumber daya                  the resources to continue in business for the
   untuk melanjutkan bisnis di masa mendatang. Selain               foreseeable future. Furthermore, the management is
   itu, manajemen menilai tidak adanya ketidakpastian               not aware of any material uncertainties that may cast
   material yang dapat menimbulkan keraguan                         significant doubt upon the Company’s ability to
   signifikan terhadap kemampuan Perusahaan untuk                   continue as a going concern. Therefore, the financial
   mempertahankan kelangsungan usahanya. Oleh                       statements continue to be prepared on the going
   karena itu, laporan keuangan dilanjutkan untuk                   concern basis. Details related to this matter are
   disusun atas basis kelangsungan usaha. Rincian                   disclosed in Note 44.
   terkait masalah ini diungkapkan dalam Catatan 44.

   Sumber Ketidakpastian Estimasi                                   Sources of Estimation Uncertainty

   Asumsi utama mengenai masa depan dan sumber                      The key assumptions concerning future and other key
   estimasi ketidakpastian utama lainnya pada akhir                 sources of estimation uncertainty at the end of the
   periode pelaporan, yang memiliki risiko signifikan               reporting period, that have a significant risk of causing
   yang mengakibatkan penyesuaian material terhadap                 a material adjustment to the carrying amounts of
   jumlah tercatat aset dan liabilitas dalam periode                assets and liabilities within the next financial year are
   pelaporan berikutnya dijelaskan dibawah ini:                     discussed below:

   a.   Rugi Penurunan Nilai Piutang Usaha dan                      a.   Impairment Loss on Accounts Receivable and
        Tagihan Bruto                                                    Gross Amounts Due from Customers

        Perusahaan menilai secara individual penurunan                   The Company assesses individually its accounts
        nilai piutang usaha dan tagihan bruto pada setiap                receivable and gross amounts due from
        tanggal pelaporan. Dalam menentukan apakah                       customers for impairment at each reporting date.
        rugi penurunan nilai harus dicatat dalam laba                    In determining whether an impairment loss
        rugi, manajemen harus mempertimbangkan                           should be recorded in profit or loss, management
        informasi yang wajar dan terdukung yang                          makes a judgement as to whether there is
        tersedia tanpa biaya atau upaya berlebihan pada                  reasonable and supportable information that is
        tanggal pelaporan mengenai peristiwa masa lalu,                  available without undue cost or effort about past
        kondisi kini, dan perkiraan kondisi masa depan.                  events, current conditions and forecast of future
        Dalam menentukan ECL, manajemen telah                            conditions. In determining the ECL, management
        memperhitungkan posisi keuangan pihak                            has taken into account the financial position of
        berelasi terkait, disesuaikan dengan faktor-faktor               the related parties, adjusted for factors that are
        spesifik dari pihak berelasi dan kondisi ekonomi                 specific to the related parties and general
        umum industri di mana pihak berelasi beroperasi,                 economic conditions of the industry in which the
        dalam memperkirakan kemungkinan terjadinya                       related parties operate, in estimating the
        gagal bayar pinjaman serta kerugian saat                         probability of default of the other accounts
        terjadinya gagal bayar. Nilai tercatat piutang                   receivable as well as the loss upon default. The
        usaha dan tagihan bruto telah diungkapkan                        carrying amounts of accounts receivable and
        masing-masing dalam Catatan 6 dan 9.                             gross amounts due from customers are disclosed
                                                                         in Notes 6 and 9, respectively.

   b.   Taksiran Masa Manfaat Ekonomis Aset Tetap                   b.   Estimated Useful Lives of Property, Plant and
                                                                         Equipment

        Masa manfaat setiap aset tetap Perusahaan                        The useful life of each item of the Company’s
        ditentukan   berdasarkan      kegunaan       yang                property, plant and equipment, are estimated
        diharapkan dari penggunaan aset tersebut.                        based on the period over which the asset is
        Estimasi ini ditentukan berdasarkan evaluasi                     expected to be available for use. Such estimation
        teknis internal dan pengalaman atas aset                         is based on internal technical evaluation and
        sejenis. Masa manfaat setiap aset ditelaah                       experience with similar assets. The estimated
        secara periodik dan disesuaikan apabila                          useful life of each asset is reviewed periodically
        perkiraan berbeda dengan estimasi sebelumnya                     and updated if expectations differ from previous
        karena kerusakan akibat kecelakaan, keusangan                    estimates due to physical wear and tear,
        teknis dan komersial, hukum atau keterbatasan                    technical or commercial obsolescence and legal
        lainnya atas pemakaian aset. Namun terdapat                      or other limits on the use of the asset. It is
        kemungkinan bahwa hasil operasi dimasa                           possible, however, that future results of
        mendatang dapat dipengaruhi secara signifikan                    operations could be materially affected by
        oleh perubahan atas jumlah serta periode                         changes in the amounts and timing of recorded
        pencatatan biaya yang diakibatkan karena                         expenses brought about by changes in the
        perubahan faktor yang disebutkan di atas.                        factors mentioned above.
        Perubahan masa manfaat aset tetap dapat                          A change in the estimated useful life of any item
        mempengaruhi jumlah biaya penyusutan yang                        of property, plant and equipment would affect the
        diakui dan penurunan nilai tercatat aset tetap.                  recorded depreciation expense and the carrying
                                                                         amounts of property, plant and equipment.
                                                             54
Page 58
                                                                                The original financial statements included herein are in
                                                                                                              the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                    PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                            NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                  JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                               30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                  ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                 (UNAUDITED)


        Nilai tercatat aset tetap diungkapkan dalam                       The carrying amounts of property, plant and
        Catatan 12.                                                       equipment are disclosed in Note 12.

   c.   Liabilitas Imbalan Pascakerja                            •   c.   Employee Benefits Obligations

        Penentuan liabilitas imbalan kerja Perusahaan                     The determination of the Company’s employee
        bergantung pada pemilihan asumsi yang                             benefits liabilities is dependent on its selection of
        digunakan oleh aktuaris independen dalam                          certain assumptions used by the independent
        menghitung jumlah-jumlah tersebut. Asumsi                         actuaries in calculating such amounts. Those
        tersebut termasuk antara lain, tingkat diskonto,                  assumptions include among others, discount
        tingkat    kenaikan     gaji   tahunan,   tingkat                 rates, future annual salary increase, annual
        pengunduran diri karyawan tahunan, tingkat                        employee turn-over rate, disability rate,
        kecacatan, umur pensiun dan tingkat kematian.                     retirement age and mortality rate. Actual results
        Hasil aktual yang berbeda dari asumsi yang                        that differ from the Company’s assumptions are
        ditetapkan Perusahaan diakui segera pada                          recognized immediately in the statement of
        laporan posisi keuangan dengan debit atau kredit                  financial position with a corresponding debit or
        ke saldo laba melalui penghasilan komprehensif                    credit to retained earnings through other
        lainnya dalam periode terjadinya. Sementara                       comprehensive income in the period which they
        Perusahaan berkeyakinan bahwa asumsi                              occur. While the Company believes that its
        tersebut adalah wajar dan sesuai, perbedaan                       assumptions are reasonable and appropriate,
        signifikan pada hasil aktual atau perubahan                       significant differences in the Company’s actual
        signifikan dalam asumsi yang ditetapkan                           experiences or significant changes in the
        Perusahaan dapat mempengaruhi secara                              Company’s assumptions may materially affect its
        material liabilitas diestimasi atas pensiun dan                   estimated liabilities for pension and employee
        imbalan kerja dan beban imbalan kerja neto.                       benefits and net employee benefits expense. The
        Penjelasan lebih rinci diungkapkan dalam                          carrying amounts of the employee benefits
        Catatan 36.                                                       liabilities are disclosed in Note 36.

   d.   Pajak Penghasilan                                        •   d.   Income Tax

        Pertimbangan signifikan dilakukan dalam                           Significant judgment is involved in determining
        menentukan provisi atas pajak penghasilan                         provision for corporate income tax. There are
        badan. Terdapat transaksi dan perhitungan                         certain transactions and computation for which
        tertentu yang penentuan pajak akhirnya adalah                     the ultimate tax determination is uncertain during
        tidak pasti sepanjang kegiatan usaha normal.                      the ordinary course of business. The Company
        Perusahaan mengakui liabilitas atas pajak                         recognizes liabilities for expected corporate
        penghasilan       badan     yang    diharapkan                    income tax issues based on estimates of whether
        berdasarkan estimasi apakah akan terdapat                         additional corporate income tax will be due.
        tambahan pajak penghasilan badan. Penjelasan                      Further details are disclosed in Note 34.
        lebih rinci diungkapkan dalam Catatan 34.

   e.   Estimasi Persentase Penyelesaian                             e.   Estimated Percentage of Completion

        Perusahaan mempertimbangkan syarat dan                            The Company considers the terms and
        ketentuan kontrak termasuk bagaimana kontrak                      conditions of the contract including how the
        dinegosiasikan dan elemen struktural yang                         contract was negotiated and the structural
        ditentukan oleh pelanggan saat mengidentifikasi                   elements that the customer specifies when
        proyek sebagai kontrak konstruksi. Persentase                     identifying individual projects as construction
        penyelesaian diperkirakan dengan mengacu                          contracts. The percentage of completion is
        pada tahap proyek dan kontrak berdasarkan                         estimated by reference to the stage of completion
        laporan kemajuan progres fisik oleh manajemen,                    of the projects and contracts based on physical
        pemberi kerja dan konsultan pihak ketiga.                         progress determined by management, project
                                                                          owners and third party consultant.

   f.   Penyisihan Penurunan        Nilai   Pasar    dan             f.   Allowance for Decline in Market Values and
        Keusangan Persediaan                                              Obsolescence of Inventories

        Penyisihan penurunan nilai pasar dan                              Allowance for decline in market values and
        keusangan persediaan diestimasi berdasarkan                       obsolescence of inventories is estimated based
        fakta dan situasi yang tersedia, termasuk namun                   on the best available facts and circumstances,
        tidak terbatas kepada, kondisi fisik persediaan                   including but not limited to, the inventories’ own
        yang dimiliki, harga jual pasar, estimasi biaya                   physical conditions, their market selling prices,
        penyelesaian dan estimasi biaya yang timbul                       estimated costs of completion and estimated
        untuk penjualan. Provisi dievaluasi kembali dan                   costs to be incurred for their sales. The
                                                            55
Page 59
                                                                                                          The original financial statements included herein are in
                                                                                                                                        the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                                         PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                                                 NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                                       JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                                    30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                                       ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                                      (UNAUDITED)

            disesuaikan jika terdapat tambahan informasi                                        provisions are re-evaluated and adjusted as
            yang mempengaruhi jumlah yang diestimasi.                                           additional information received affects the
            Penjelasan lebih rinci diungkapkan dalam                                            amount estimated. The carrying amounts of
            Catatan 8.                                                                          inventories are disclosed in Note 8.

     g.     Penurunan Nilai Aset Non-keuangan                                              g.   Impairment of Non-financial Assets

            Penurunan nilai muncul saat nilai tercatat aset                                     An impairment exists when the carrying value of
            atau unit penghasil kas melebihi nilai                                              an asset or cash-generating unit exceeds its
            terpulihkannya, yang lebih besar antara nilai                                       recoverable amount, which is the higher of its fair
            wajar dikurangi biaya untuk menjual dan nilai                                       value less costs to sell and its value in use. The
            pakainya. Nilai wajar dikurangi biaya untuk                                         fair value less costs to sell calculation is based
            menjual didasarkan pada ketersediaan data dari                                      on available data from binding sales transactions
            perjanjian penjualan yang mengikat yang dibuat                                      in an arm’s length transaction of similar assets or
            dalam transaksi normal atas aset serupa atau                                        observable market prices less incremental costs
            harga pasar yang dapat diamati dikurangi                                            for disposing of the asset. The value in use
            dengan      biaya    tambahan    yang    dapat                                      calculation is based on a discounted cash flow
            diatribusikan     dengan    pelepasan     aset.                                     model. The cash flows are derived from the
            Perhitungan nilai pakai didasarkan pada model                                       budget for the next a year and do not include
            arus kas yang didiskontokan. Data arus kas                                          restructuring activities that the Company is not
            diambil dari anggaran untuk satu tahun yang                                         yet committed to or significant future investments
            akan datang dan tidak termasuk aktivitas                                            that will enhance the asset’s performance of the
            restrukturisasi yang belum dilakukan oleh                                           cash-generating unit being tested. The
            Perusahaan atau investasi signifikan dimasa                                         recoverable amount is most sensitive to the
            datang yang akan memutakhirkan kinerja aset                                         discount rate used for the discounted cash flow
            dari Unit Penghasil Kas (UPK) yang diuji. Nilai                                     model as well as the expected future cash inflows
            terpulihkan paling dipengaruhi oleh tingkat                                         and the growth rate used for extrapolation
            diskonto yang digunakan dalam model arus kas                                        purposes.
            yang didiskontokan, sebagaimana juga jumlah
            arus kas masuk di masa datang yang diharapkan
            dan tingkat pertumbuhan yang digunakan untuk
            tujuan ekstrapolasi.

            Asumsi      utama      yang     digunakan untuk                                     The key assumptions used to determine the
            menentukan jumlah terpulihkan untuk unit                                            recoverable amount for the different cash-
            penghasil kas yang berbeda, termasuk analisis                                       generating units, including a sensitivity analysis,
            sensitivitas, dan nilai tercatatnya.                                                and its carrying amounts.


5.   KAS DAN SETARA KAS                                                              5.    CASH AND CASH EQUIVALENT

                                                            30 Juni/        31 Desember/          30 Juni/
                                                            June 30         December 31,          June 30
                                                             2023               2022               2022
                                                              Rp                 Rp                 Rp

      Kas                                                    223.808.258         228.123.069       227.460.572                                             Cash on Hand

      Bank                                                                                                                                                 Cash in Banks
        Pihak Berelasi (Catatan 37)                                                                                                           Related Parties (Note 37)
        Rupiah                                                                                                                                                  Rupiah
          PT Bank Negara Indonesia (Persero) Tbk           24.369.844.388    55.112.452.785      93.478.927.168             PT Bank Negara Indonesia (Persero) Tbk
          PT Bank Tabungan Negara (Persero) Tbk             1.430.909.445    38.996.493.653       5.396.655.048             PT Bank Tabungan Negara (Persero) Tbk
          PT Bank Mandiri (Persero) Tbk                     6.944.780.301    38.909.733.518      26.090.843.775                       PT Bank Mandiri (Persero) Tbk
          PT Bank Rakyat Indonesia (Persero) Tbk            7.569.637.775    16.976.753.127      34.914.692.837              PT Bank Rakyat Indonesia (Persero) Tbk
          Bank Syariah Indonesia                                                                                                              Bank Syariah Indonesia
            (d/h PT Bank Mandiri Syariah,                                                                                       (formerly PT Bank Mandiri Syariah,
            PT Bank BNI Syariah dan PT Bank BRI Syariah)      21.203.592          21.518.592         21.803.592     PT Bank BNI Syariah and PT Bank BRI Syariah)
          PT Bank Raya Indonesia                               1.145.000           1.325.000          1.385.000                              PT Bank Raya Indonesia

          Pihak Berelasi (Catatan 37)                                                                                                         Related Parties (Note 37)
          USD                                                                                                                                                     USD
            PT Bank Mandiri (Persero) Tbk                                                                                             PT Bank Mandiri (Persero) Tbk
              ($25,029.94 pada 30 Juni 2023                                                                                       ($25,029,94 as of June 30, 2023
              dan $176.963,27 pada 31 Desember 2022)         376.099.878      2.762.320.591       3.225.337.795         and $176,963.27 as of December 31, 2022)
            PT Bank Negara Indonesia (Persero) Tbk                                                                          PT Bank Negara Indonesia (Persero) Tbk
              ($22,739,23 pada 30 Juni 2023                                                                                       ($22,739.23 as of June 30, 2023
               dan $22.740,70 pada 31 Desember 2022)         341.679.670       354.976.090          24.476.780           and $22,740.70 as of December 31, 2022)
                                                           41.055.300.049   153.135.573.356     163.154.121.995

                                                                            56
Page 60
                                                                                                                           The original financial statements included herein are in
                                                                                                                                                         the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                                                   PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                                                           NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                                                 JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                                              30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                                                 ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                                                (UNAUDITED)

                                                               30 Juni/             31 Desember/                30 Juni/
                                                               June 30              December 31                 June 30
                                                                2023                    2022                     2022
                                                                 Rp                      Rp                       Rp

        Pihak Ketiga                                                                                                                                                   Third Parties
        Rupiah                                                                                                                                                               Rupiah
          PT Bank BJB                                         10.361.114.282         56.436.124.205                        --                                       PT Bank BJB
          PT Bank Artha Graha Internasional                    2.494.395.593          2.494.575.593            6.468.179.784                     PT Bank Artha Graha Internasional
          PT Bank BCA Syariah                                     53.366.149             53.310.388               53.318.097                                 PT Bank BCA Syariah
          PT Bank DKI                                             50.914.420             51.054.420            2.551.573.359                                         PT Bank DKI
          PT Bank ICBC Indonesia                                  33.325.565             32.973.014               32.898.859                              PT Bank ICBC Indonesia
          PT Bank Central Asia Tbk                                 3.142.575              3.412.575                3.502.576                             PT Bank Central Asia Tbk
          PT Bank CTBC Indonesia                                   2.864.964              3.145.091                3.395.091                             PT Bank CTBC Indonesia
          PT Bank Permata Tbk                                      1.489.931              1.832.423                2.006.360                                 PT Bank Permata Tbk
          PT Bank Pembangunan Daerah Banten Tbk                    1.156.356              1.100.219              560.033.698             PT Bank Pembangunan Daerah Banten Tbk
          PT Bank Sumitomo Mitsui Indonesia                          726.316                777.928                  867.928                   PT Bank Sumitomo Mitsui Indonesia
          PT Bank CIMB Niaga Tbk                                           -          1.191.474.013            1.189.700.373                             PT Bank CIMB Niaga Tbk
                                                              13.002.496.151         60.269.779.869           10.865.476.125

        Jumlah Bank                                           54.057.796.200        213.405.353.225          174.019.598.120                                                      Total Bank

     Deposito                                                                                                                                                                   Deposit
       Pihak Berelasi (Catatan 37)                                                                                                                         Related Parties (Note 37)
       Rupiah                                                                                                                                                                 Rupiah
         PT Bank Negara Indonesia (Persero) Tbk dengan                                                                                 PT Bank Negara Indonesia (Persero) Tbk dengan
           tingkat bunga per tahun sebesar 2,5% tahun 2023    10.313.380.000         25.313.380.000                           --        interest rates per annum at 2.5% in 2023
                                                              10.313.380.000         25.313.380.000                           --

     Jumlah Kas dan Setara Kas                                64.594.984.458        238.946.856.294          174.247.058.692                          Total Cash and Cash Equivalents



6.   PIUTANG USAHA – BERSIH                                                                    6.      ACCOUNTS RECEIVABLE - NET

                                                                  30 Juni/              31 Desember/                30 Juni/
                                                                  June 30               December 31,                June 30
                                                                   2023                     2022                     2022
                                                                    Rp                       Rp                       Rp

     Pihak Berelasi (Catatan 37)                                1.867.466.023.597        1.776.905.822.875        1.726.674.231.557                                    Related Parties (Note 37)
     Dikurangi : Penyisihan Kerugian Penurunan Nilai          (1.115.040.412.715)      (1.155.692.365.565)        (980.851.257.137)                       Less: Allowance for Impairment Losses
     Jumlah Pihak Berelasi                                       752.425.610.883          621.213.457.310           745.822.974.420                                       Total Related Parties

     Pihak Ketiga                                                 705.937.170.505          711.543.122.568          682.991.400.000                                                 Third Parties
     Dikurangi : Penyisihan KerugianPenurunan Nilai             (513.288.373.010)        (499.490.438.867)        (477.411.933.672)                       Less: Allowance for Impairment Losses
     Jumlah Pihak Ketiga                                         192.648.797.495          212.052.683.701           205.579.466.328                                          Total Third Parties
     Jumlah Piutang Usaha - Bersih                               945.074.408.377          833.266.141.011           951.402.440.748                            Total Accounts Receivable - Net



     Rincian saldo piutang usaha kepada pihak berelasi                                                 The details of accounts receivable from related
     adalah sebagai berikut:                                                                           parties are as follows:

                                                                 30 Juni/             31 Desember/                 30 Juni/
                                                                 June 30              December 31,                 June 30
                                                                  2023                    2022                      2022
                                                                   Rp                      Rp                        Rp

     PT Waskita Karya (Persero) Tbk                             550.339.516.656          439.958.747.506          311.348.365.043                             PT Waskita Karya (Persero) Tbk
     PT Waskita Bumi Wira (WBW)                                 484.178.680.915          484.178.680.915          472.986.486.068                              PT Waskita Bumi Wira (WBW)
     PT Kresna Kusuma Dyandra Marga (KKDM)                      389.586.746.824          375.069.878.979          325.202.140.731                  PT Kresna Kusuma Dyandra Marga (KKDM)
     PT Cimanggis Cibitung Tollways (CCTW)                      141.304.953.567          187.243.533.947          346.403.748.131                     PT Cimanggis Cibitung Tollways (CCTW)
     PT Hakaaston                                                75.088.280.446           69.516.182.011           65.377.847.513                                               PT Hakaaston
     PT Hutama Karya (Persero)                                   37.281.484.271           31.787.664.601                        --                                 PT Hutama Karya (Persero)
     Adhi - Minarta KSO                                          29.799.570.600                        --                       --                                        Adhi - Minarta KSO
     PT Cibitung Tanjung Priok Tollways                          19.231.943.021           35.367.504.982           13.886.257.036                          PT Cibitung Tanjung Priok Tollways
     KSO Waskita Bersama Vision First                            18.258.054.940           16.282.872.014                        --                          KSO Waskita Bersama Vision First
     PT Pembangunan Perumahan (Persero) Tbk                      11.655.942.299            5.947.896.677           13.878.868.530                  PT Pembangunan Perumahan (Persero) Tbk
     KSO Hutama Waskita                                          10.148.943.593           10.374.516.000            7.065.461.978                                      KSO Hutama Waskita
     PT Adhi Persada Beton                                       10.070.413.763           10.164.153.763            8.885.236.880                                    PT Adhi Persada Beton
     KSO Waskita - Wika                                           9.017.085.022            9.017.085.022            8.581.445.414                                        KSO Waskita - Wika
     PP - KPS KSO                                                 7.943.273.500           12.693.273.500           17.337.242.650                                             PP - KPS KSO
     Waskita - Nindya KSO                                         7.884.357.750                        --                       --                                     Waskita - Nindya KSO
     Waskita - HK - BRP KSO                                       6.964.780.500            6.964.780.500            8.166.807.857                                   Waskita - HK - BRP KSO
     Waskita Karya - Basuki Rahmanta PU                           6.759.296.280            4.721.274.000                        --                      Waskita Karya - Basuki Rahmanta PU
     Waskita - Basuki JO                                          5.410.189.449                        --                       --                                       Waskita - Basuki JO
     KSO Waskita Agung                                            4.836.581.447           43.295.218.794              902.195.168                                        KSO Waskita Agung
     KSO Waskita Acset                                            2.184.130.941            2.184.130.941            9.489.937.243                                         KSO Waskita Acset
     JO MCC - Wika - Nindya - Waskita                                         --                       --           5.836.500.000                          JO MCC - Wika - Nindya - Waskita
     Lainnya (dibawah Rp 5 Miliar)                               39.521.797.815           32.138.428.723          111.325.691.315                                 Others (below Rp 5 Billion)
     Jumlah Pihak Berelasi                                    1.867.466.023.597        1.776.905.822.875        1.726.674.231.557                                       Total Related Parties
     Dikurangi : Penyisihan Kerugian Penurunan Nilai         (1.115.040.412.715)      (1.155.692.365.565)        (980.851.257.137)                      Less: Allowance for Impairment Losses
     Jumlah Pihak Berelasi - Bersih                             752.425.610.883          621.213.457.310          745.822.974.420                                       Total Related Parties



                                                                                    57
Page 61
                                                                                                                       The original financial statements included herein are in
                                                                                                                                                     the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                                                  PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                                                          NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                                                JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                                             30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                                                ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                                               (UNAUDITED)

   Rincian saldo piutang usaha kepada pihak ketiga                                                    The details of accounts receivable from third parties
   adalah sebagai berikut:                                                                            are as follows:

                                                                   30 Juni/           31 Desember/                30 Juni/
                                                                   June 30            December 31,                June 30
                                                                    2023                  2022                     2022
                                                                     Rp                    Rp                       Rp

   Semut Tama Langgeng PTE LTD                                    435.000.000.000         435.000.000.000        435.000.000.000                              Semut Tama Langgeng PTE LTD
   RDMP Balikpapan JO                                              26.839.562.704          26.839.562.704         10.106.480.368                                        RDMP Balikpapan JO
   PT Sumber Urip Sejati                                            7.420.758.442           4.737.055.936            832.955.936                                        PT Sumber Urip Sejati
   PT Encona Inti Industri                                          6.969.395.515           7.969.395.515          1.512.745.740                                       PT Encona Inti Industri
   PT Duta Permata Lestari                                          5.196.579.680           5.196.579.680          3.878.708.800                                      PT Duta Permata Lestari
   PT Mandiri Bangun Makmur                                         5.028.031.931           5.028.031.931         21.617.004.113                                   PT Mandiri Bangun Makmur
   PT Kapuk Naga Indah                                              5.005.914.254           5.005.914.254          6.549.153.787                                        PT Kapuk Naga Indah
   PT Dadi Develop Indonesia                                        1.790.419.500           5.542.045.900                      --                                  PT Dadi Develop Indonesia
   PT Bumi Serpong Damai                                              285.000.000           5.842.050.000                      --                                     PT Bumi Serpong Damai
   Shimizu Pembangunan Perumahan Bangun Cipta Kontraktor JV         3.696.226.700           3.696.226.700         20.855.628.972    Shimizu Pembangunan Perumahan Bangun Cipta Kontraktor JV
   PT Rekagunatek Persada                                                 100.000                 100.000          7.968.459.180                                     PT Rekagunatek Persada
   PT Semen Indogreen Sentosa                                              60.000           3.796.288.100          7.729.620.610                                 PT Semen Indogreen Sentosa
   PT Mitralanggeng Putra Mandiri Konstruksi                          142.649.990             142.649.990          6.475.295.288                     PT Mitralanggeng Putra Mandiri Konstruksi
   Lainnya (dibawah Rp 5 Miliar)                                  208.562.471.789         202.747.221.858        160.465.347.207                                    Others (below Rp 5 Billion)
   Jumlah Pihak Ketiga                                            705.937.170.505         711.543.122.568        682.991.400.001                                              Total Third Parties
   Dikurangi : Penyisihan Kerugian Penurunan Nilai              (513.288.373.010)        (499.490.438.867)      (477.411.933.672)                         Less: Allowance for Impairment Losses
   Jumlah Pihak Ketiga - Bersih                                   192.648.797.495         212.052.683.701        205.579.466.329                                        Total Third Parties - Net



   Piutang usaha - bersih berdasarkan umur adalah                                                     Aging of accounts receivable - net is as follows:
   sebagai berikut:

                                                                  30 Juni/           31 Desember/               30 Juni/
                                                                  June 30            December 31,               June 30
                                                                   2023                  2022                    2022
                                                                    Rp                    Rp                      Rp


   Lancar                                                        160.485.639.382         152.860.303.545        198.223.130.545                                                       Current
   Lewat jatuh tempo                                                                                                                                                                 Past due
     < 6 bulan                                                   152.087.622.425       277.358.556.273          100.077.749.598                                                 < 6 Months
     6 bulan - < 12 bulan                                        355.621.479.245       111.360.069.512          181.274.556.392                                    6 Months to < 12 Months
     > 12 bulan                                                1.905.208.453.052     1.946.870.016.113        1.930.090.195.022                                                > 12 Months
                                                               2.573.403.194.104     2.488.448.945.443        2.409.665.631.557
   Dikurangi : Penyisihan Kerugian Penurunan Nilai            (1.628.328.785.725)   (1.655.182.804.432)      (1.458.263.190.809)                     Less: Allowance for Impairment Losses
   Bersih                                                        945.074.408.379         833.266.141.011        951.402.440.748                                                            Net

   Piutang usaha seluruhnya dalam mata uang Rupiah.                                                   All accounts receivable are denominated in Rupiah.

   Jangka waktu rata-rata kredit penjualan barang                                                     The average credit period on sale of goods is 90 days.
   adalah 90 hari. Tidak ada bunga yang dibebankan                                                    No interest is charged on past due accounts
   atas piutang usaha yang telah jatuh tempo.                                                         receivable.

   Mutasi cadangan kerugian penurunan nilai                                                           Movements in the allowance for impairment losses

                                                                  30 Juni/           31 Desember/               30 Juni/
                                                                  June 30            December 31,               June 30
                                                                   2023                  2022                    2022
                                                                    Rp                    Rp                      Rp

   Saldo Awal                                                 1.655.182.804.432      1.020.895.530.776       1.020.895.530.776                                              Beginning balance
   Penambahan PSAK 71 tahun berjalan (Catatan 29)                73.707.947.488        172.293.938.376         464.490.556.464                          Provision during the period (Note 29)
   Perubahan parameter risiko kredit (Catatan 29)                             --       475.699.430.960          55.417.097.505                     Changes in credit risk parameters (Note 29)
   Perubahan cadangan kerugian                                                                                                                                       Change in loss allowance
     karena penyelesaian (Catatan 29)                          (100.561.966.195)      (13.706.095.680)         (82.539.993.936)                                 due to settlement (Note 29)
   Saldo akhir                                                1.628.328.785.725      1.655.182.804.432       1.458.263.190.809                                               Ending balance

                                                                                    58
Page 62
                                                                                          The original financial statements included herein are in
                                                                                                                        the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                             PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                                     NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                           JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                        30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                           ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                          (UNAUDITED)

     Manajemen       berpendapat   bahwa    cadangan                           The management believes that allowance for
     penurunan nilai piutang usaha adalah cukup untuk                          impairment losses of accounts receivable is sufficient
     menutupi kerugian yang mungkin timbul dari tidak                          to cover possible losses on uncollectible accounts
     tertagihnya piutang tersebut.                                             receivable.

     CCTW, WBW, KKDM, WSKT dan Semut Tama                                      CCTW, WBW, KKDM, WSKT and Semut Tama
     Langgeng PTE LTD merupakan klien terbesar                                 Langgeng PTE LTD are the Company’s largest
     Perusahaan dan saldo piutang Perusahaan dari para                         customers and the balance of the Company’s
     pelanggan tersebut memiliki lebih dari 10% dari                           receivables from these customers represent more
     jumlah saldo piutang usaha.                                               than 10% of the total balance of accounts receivable.

     Piutang usaha Perusahaan dijadikan sebagai                                The Company’s accounts receivable are used as
     jaminan atas fasilitas pinjaman jangka pendek yang                        collateral for the short-term loan facilities obtained
     diperoleh dari beberapa bank (Catatan 15).                                from several banks (Note 15).

7.   PIUTANG LAIN-LAIN                                                   7.    OTHER RECEIVABLES

                                               30 Juni/          31 Desember/          30 Juni/
                                               June 30           December 31,          June 30
                                                2023                 2022               2022
                                                 Rp                   Rp                 Rp

     Phak Berelasi (Catatan 37)                                                                                         Related Parties (Note 37)
       PT Waskita Karya (Persero) Tbk         13.582.418.246         14.127.628.263    5.666.001.800            PT Waskita Karya (Persero) Tbk
       Waskita - Nindya KSO                    2.364.721.578                      --               --                    Waskita - Nindya KSO
       Waskita - Nindya - Modern KSO           1.192.739.874                                                    Waskita - Nindya - Modern KSO
       Waskita - Utama KSO                                 --         1.344.779.291                --                     Waskita - Utama KSO
       Lainnya (Dibawah Rp1 Miliar)              651.458.865          1.578.278.661                --             Lainnya (Dibawah Rp1 Miliar)
       Jumlah Pihak Berelasi                  17.791.338.563         17.050.686.215    5.666.001.800                    Jumlah Pihak Berelasi

     Pihak Ketiga                                                                                                                    Third Parties
       PT Yasa Patria Perkasa                  1.673.191.800          1.673.191.800                --                   PT Yasa Patria Perkasa
       PT Citra Putra Realty                   1.147.917.600          1.147.917.600    1.147.917.600                      PT Citra Putra Realty
       Gunakarya Nusantara                                 --         4.288.762.500                --                    Gunakarya Nusantara
       Lainnya (Dibawah Rp1 Miliar)            2.765.113.870            928.335.839    2.202.743.882                  Others (below Rp1 Billion)
       Jumlah Pihak Ketiga                     5.586.223.270          8.038.207.739    3.350.661.482                        Total Third Parties

     Jumlah                                   23.377.561.833         25.088.893.954    9.016.663.282                                         Total


     Piutang lain-lain berdasarkan umur adalah sebagai                         Aging of other receivables is as follows:
     berikut:

                                               30 Juni/          31 Desember/          30 Juni/
                                               June 30           December 31,          June 30
                                                2023                 2022               2022
                                                 Rp                   Rp                 Rp

     < 6 bulan                                 9.951.676.694         14.070.896.728    4.495.311.793                                   < 6 Months
     6 bulan - 12 bulan                       10.177.464.647          7.891.156.546      189.165.501                         6 Months - 12 Months
     > 12 bulan                                3.248.420.492          3.126.840.680    4.332.185.988                                 > 12 Months

     Jumlah                                   23.377.561.833         25.088.893.954    9.016.663.282                                         Total


     Piutang lain-lain seluruhnya dalam mata uang                              All other receivables are denominated in Rupiah.
     Rupiah.

     Piutang lain-lain dari WSKT salah satunya                                 One of other receivables from WSKT represent
     merupakan uang pesangon karyawan WSKT yang                                severance pay of WSKT employees seconded to the
     diperbantukan kepada Perusahaan yang telah                                Company that has been paid by the Company on
     dibayarkan oleh Perusahaan atas nama WSKT.                                behalf of WSKT.

     Tidak diadakan cadangan kerugian penurunan nilai                          No allowance for impairment losses was provided on
     atas     piutang  lain-lain   karena      manajemen                       other receivables as management believes that all
     berkeyakinan seluruh piutang lain-lain tersebut dapat                     such other receivables are collectible.
     ditagih.

                                                                59
Page 63
                                                                                              The original financial statements included herein are in
                                                                                                                            the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                              PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                                      NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                            JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                         30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                            ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                           (UNAUDITED)


8.   PERSEDIAAN - BERSIH                                                  8.     INVENTORIES - NET

                                               30 Juni/           31 Desember/              30 Juni/
                                               June 30            December 31,              June 30
                                                2023                  2022                   2022
                                                 Rp                    Rp                     Rp

     Bahan baku                              182.302.621.413      201.281.454.773         324.198.265.643                                     Raw materials
     Barang jadi                             174.358.036.584      141.300.668.890         304.235.266.809                                    Finished goods
     Suku cadang                              45.555.519.578       42.352.586.010          47.766.496.138                                         Spareparts
     Barang penolong                          10.044.423.249       10.996.355.721          12.787.006.055                                Supporting materials
     Jumlah                                  412.260.600.824      395.931.065.394         688.987.034.645                                              Total
     Dikurangi: Penyisihan penurunan nilai                                                                         Less: Allowance for decline in market value
       pasar dan keusangan persediaan        (89.428.414.615)     (49.737.760.986)                       --                 and obsolescence of inventories

     Jumlah                                  322.832.186.209      346.193.304.408         688.987.034.645                                               Total


     Beton precast merupakan persediaan produk beton                             Precast concrete represents concrete products
     yang digunakan untuk divisi konstruksi dan precast.                         inventory used for construction and by precast
                                                                                 division.

     Persediaan bahan baku merupakan persediaan yang                             Raw material inventories are supplies that will be
     akan digunakan dalam proses produksi, seperti                               used in the production process, such as cement,
     semen, pasir, besi, kawat dan lain-lain.                                    sand, iron, wire and others.

     Persediaan suku cadang merupakan persediaan                                 Sparepart inventories consist of spareparts used for
     yang digunakan untuk mengganti suku cadang yang                             replacement of damaged spareparts of factory
     rusak atas peralatan pabrik dan peralatan                                   equipment and transportation equipment.
     transportasi.

     Biaya persediaan yang diakui sebagai beban                                  The cost of inventories recognized as cost of
     pokok    pendapatan      adalah     masing-masing                           revenues amounted to Rp460,217,051,958 and
     Rp460.217.051.958 dan Rp611.274.764.446 untuk                               Rp611,274,764,446     for    the     year ended
     tahun yang berakhir 30 Juni 2023 dan 2022.                                  June 30, 2023 and 2022, respectively.

     Berdasarkan penelaahan atas kondisi persediaan                              Based on the review of the condition of inventories at
     pada akhir periode pelaporan, manajemen                                     the end of the reporting period, management provided
     membentuk cadangan untuk penurunan nilai dan                                an allowance for decline in value and obsolescence
     keusangan persediaan per 30 Juni 2023, 31                                   of inventories as of June 30, 2023 and December 31,
     Desember 2022 dan 30 Juni 2022 masing-masing                                2022       amounting        to     Rp89,428,414,615,
     sebesar Rp89.428.414.615, Rp49.737.760.986 dan                              Rp49,737,760,986 and nil, respectively.
     nihil.

     Mutasi penyisihan penurunan nilai dan keusangan                             Movements in the allowance for decline in value and
     persediaan                                                                  obsolescence of inventories

                                                 30 Juni/             31 Desember/            30 Juni/
                                                 June 30              December 31,            June 30
                                                  2023                    2022                  2022
                                                   Rp                      Rp                    Rp


     Saldo Awal                               (49.737.760.986)                       --                       --                            Beginning balance
     Penambahan (Catatan 29)                  (40.581.306.447)        (49.737.760.986)                        --                          Provision (Notes 29)
     Pemulihan                                    890.652.818                        --                       --                                     Recovery
     Pada akhir periode                       (89.428.414.615)        (49.737.760.986)                        --                              Ending balance

     Manajemen berpendapat bahwa provisi penurunan                               Management believes that the provision for
     nilai persediaan tersebut memadai untuk menutup                             impairment of inventories is adequate to cover

                                                                 60
Page 64
                                                                                                                The original financial statements included herein are in
                                                                                                                                              the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                                               PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                                                       NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                                             JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                                          30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                                             ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                                            (UNAUDITED)

     kemungkinan kerugian karena                       keusangan             dan                  possible losses on obsolescence and decline in value
     penurunan nilai persediaan.                                                                  of inventories.

     Persediaan dengan nilai tercatat masing-masing                                               Inventories      with     carrying   amounts     of
     sebesar     Rp175.000.000.000        pada    tanggal                                         Rp175,000,000,000 as of June 30, 2023 and
     30 Juni 2023 dan 31 Desember 2022 dijadikan                                                  December 31, 2022, are used as collateral for short-
     sebagai jaminan atas fasilitas pinjaman kredit modal                                         term loan facilities obtained from PT Bank Syariah
     kerja yang diperoleh dari PT Bank Syariah Indonesia                                          Indonesia (Note 15).
     (Catatan 15).

     Perusahaan tidak mengasuransikan persediaan yang                                             The company does not insure its inventory because
     dimilikinya karena persediaan digunakan untuk                                                inventory is used for the production process, so the
     proses produksi, sehingga pergerakannya cepat.                                               movement is fast.


9.   TAGIHAN             BRUTO            KEPADA       PELANGGAN               -            9.    GROSS AMOUNTS DUE FROM CUSTOMERS -
     BERSIH                                                                                       NET

                                                          30 Juni/             31 Desember/                 30 Juni/
                                                          June 30              December 31,                 June 30
                                                           2023                    2022                      2022
                                                            Rp                      Rp                        Rp

     Pihak Berelasi (Catatan 37)                        1.280.547.046.293          1.566.291.430.408      1.465.303.759.033                          Related Parties (Note 37)

        Dikurangi : Penyisihan Kerugian                                                                                                                   Less: Allowance for
          Penurunan Nilai                               (974.782.403.859)      (1.051.539.738.176)       (1.004.571.237.630)                           Impairment Losses

     Jumlah Pihak Berelasi - Bersih                       305.764.642.434           514.751.692.232         460.732.521.403                       Total Related Parties - Net

     Pihak Ketiga                                       1.089.599.180.882          1.103.665.657.794      1.166.838.780.440                                      Third Parties

        Dikurangi : Penyisihan Kerugian                                                                                                                  Less: Allowance for
          Penurunan Nilai                              (1.051.600.854.476)         (924.463.062.352)     (1.049.704.808.755)                           Impairment Losses

     Jumlah Pihak Ketiga - Bersih                          37.998.326.405           179.202.595.442         117.133.971.685                          Total Third Parties - Net

     Jumlah Tagihan Bruto                                                                                                                              Total Gross Amount
       kepada Pelanggan - Bersih                          343.762.968.839           693.954.287.674         577.866.493.088                    Due from Customers - Net


     Rincian saldo tagihan bruto kepada pelanggan                                                 The details of gross amounts due from customers are
     adalah sebagai berikut:                                                                      as follows:

                                                           30 Juni/                31 Desember/               30 Juni/
                                                           June 30                 December 31,               June 30
                                                            2023                       2022                    2022
                                                             Rp                         Rp                      Rp

     PT Waskita Bumi Wira                                  781.512.004.330            781.512.004.330        781.512.004.330                           PT Waskita Bumi Wira
     PT Cimanggis Cibitung Tolways                         268.358.391.777            388.172.829.018        299.968.689.872                 PT Cimanggis Cibitung Tolways
     PT Kresna Kusuma Dyandra Marga                         96.393.027.068            111.004.871.904        130.691.147.846             PT Kresna Kusuma Dyandra Marga
     PT Waskita Karya (Persero) Tbk                         75.526.259.998            192.142.773.464        121.680.572.967                PT Waskita Karya (Persero) Tbk
     PT Hakaaston                                           20.933.691.083             23.698.361.083          2.914.836.800                                   PT Hakaaston
     KSO Waskita Bersama Vision First                       12.664.186.698             28.687.811.632         21.122.690.095              KSO Waskita Bersama Vision First
     Adhi-Minarta KSO                                        8.430.300.000                          --                     --                              Adhi-Minarta KSO
     Waskita Karya - Basuki Rahmanta PU                      4.397.570.000              6.456.676.000                      --         Waskita Karya - Basuki Rahmanta PU
     Waskita - Utama KSO                                     4.196.447.508                          --                     --                          Waskita - Utama KSO
     Waskita - Adhi KSO                                      2.311.712.844              2.311.712.844          2.311.712.844                             Waskita - Adhi KSO
     PT Adhi Karya (Persero) Tbk                             2.307.215.738              2.884.206.088            608.671.140                    PT Adhi Karya (Persero) Tbk
     Waskita - Agung KSO                                     1.180.521.456              2.102.394.960          2.412.558.000                           Waskita - Agung KSO
     PT Pembangunan Perumahan (Persero) Tbk                    347.064.800              6.399.754.800          3.522.145.600     PT Pembangunan Perumahan (Persero) Tbk
     Waskita Karya - Ricky Kencana Sukses KSO                  284.760.000              3.151.300.000                      --    Waskita Karya - Ricky Kencana Sukses KSO
     PT Hutama Karya (Persero) Tbk                              44.460.923             12.572.355.563                      --                PT Hutama Karya (Persero) Tbk
     PT Cibitung Tanjung Priok Tollways                                  --             4.729.157.620         89.483.557.900             PT Cibitung Tanjung Priok Tollways
     Hutama Waskita KSO                                                  --                         --         3.931.200.000                           Hutama Waskita KSO
     Lain-lain (dibawah Rp1 Miliar)                          1.659.432.070                465.221.102          5.143.971.639                       Others (below Rp1 Billion)
     Jumlah                                              1.280.547.046.293          1.566.291.430.408       1.465.303.759.033                                           Total
     Dikurangi : Penyisihan Kerugian Penurunan Nilai     (974.782.403.859)         (1.051.539.738.176)    (1.004.571.237.630)         Less: Allowance for Impairment Losses

     Jumlah Pihak Berelasi - Bersih                        305.764.642.434            514.751.692.232        460.732.521.403                     Total Related Parties - Net

                                                                                   61
Page 65
                                                                                                           The original financial statements included herein are in
                                                                                                                                         the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                                           PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                                                   NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                                         JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                                      30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                                         ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                                        (UNAUDITED)

                                                         30 Juni/            31 Desember/              30 Juni/
                                                         June 30             December 31,              June 30
                                                          2023                   2022                   2022
                                                           Rp                     Rp                     Rp

   Pihak Ketiga                                                                                                                                           Third Parties
   PT Kapuk Naga Indah                                    23.746.691.883         26.505.215.783         46.339.207.353                           PT Kapuk Naga Indah
   PT Kukuh Mandiri Lestari                                7.885.581.258          8.265.974.258          6.508.020.968                       PT Kukuh Mandiri Lestari
   PT Duta Graha Karya                                     5.684.520.847         16.535.445.783         18.296.470.382                            PT Duta Graha Karya
   PT Fin Centerindo Satu                                  3.972.425.570          3.972.425.570          3.972.425.570                         PT Fin Centerindo Satu
   PT Citra Putra Realty                                   3.848.321.700          3.848.321.700          3.571.598.400                            PT Citra Putra Realty
   PT Yasa Patria Perkasa                                  3.493.600.000                      --                     --                       PT Yasa Patria Perkasa
   PT Citra Abadi Mandiri                                  3.332.068.217          3.332.068.217          3.332.068.217                           PT Citra Abadi Mandiri
   PT Mega Andalan Sukses                                  3.201.360.560          2.722.471.410              4.669.560                      PT Mega Andalan Sukses
   RDMP Balikpapan JO                                      1.571.977.100          1.571.977.100          1.848.700.400                            RDMP Balikpapan JO
   PT Mandiri Bangun Makmur                                1.347.318.000          1.347.318.000          1.347.318.000                    PT Mandiri Bangun Makmur
   PT Inti Karya Persada Tehnik                            1.246.470.802          1.193.164.702          1.221.681.990                   PT Inti Karya Persada Tehnik
   PT Krakatau Engineering                                   733.542.400          5.320.880.600                      --                      PT Krakatau Engineering
   PT Peteka Karya Jala                                      526.011.934          1.677.321.582          1.984.148.604                            PT Peteka Karya Jala
   PT Encona Inti Industri                                   477.233.500            477.233.500          4.324.616.000                          PT Encona Inti Industri
   PT Rekagunatek Persada                                     18.559.200             18.559.200          8.009.512.000                      PT Rekagunatek Persada
   PT Semen Indogreen Sentosa                                          --         1.625.307.000          1.175.311.000                  PT Semen Indogreen Sentosa
   PT Bumi Serpong Damai                                               --                     --         5.700.000.000                       PT Bumi Serpong Damai
   Kine Project JO                                                     --                     --         4.769.393.432                                  Kine Project JO
   KSO STC NRC                                                         --                     --         3.540.420.000                                  KSO STC NRC
   PT Panahome Deltamas Indonesia                                      --                     --         2.771.557.586             PT Panahome Deltamas Indonesia
   PT Indonesia Pondasi Raya                                           --                     --         1.132.560.000                    PT Indonesia Pondasi Raya
   Lain-lain (dibawah Rp1 Miliar)                      1.028.513.497.911      1.025.251.973.389      1.046.989.100.978                     Others (below Rp1 Billion)
   Jumlah                                              1.089.599.180.882      1.103.665.657.794      1.166.838.780.440                               Total Third Parties
   Dikurangi : Penyisihan Kerugian Penurunan Nilai   (1.051.600.854.476)      (924.463.062.352)    (1.049.704.808.755)         Less: Allowance for Impairment Losses
   Jumlah Pihak Ketiga - Bersih                           37.998.326.405       179.202.595.442        117.133.971.685                        Total Thrid Parties - Net
   Jumlah Tagihan Bruto                                                                                                                        Total Gross Amount
     Kepada Pelanggan - Bersih                           343.762.968.839       693.954.287.674        577.866.493.088                   Due from Customers - Net

   Rincian progres pekerjaan atas tagihan bruto sampai                                        The details of gross amounts due from customers in
   dengan saat ini sebagai berikut:                                                           terms of progress to date are as follows:


                                                         30 Juni/            31 Desember/              30 Juni/
                                                         June 30             December 31,              June 30
                                                          2023                   2022                   2022
                                                           Rp                     Rp                     Rp

   Progres pekerjaan sampai dengan saat ini            17.959.516.359.225    17.324.087.944.782     16.318.669.974.504                                   Progress to date
   Penagihan sampai saat ini                         (15.589.370.132.050)   (14.654.130.856.580)   (13.686.527.435.031)                            Progress billings to date
   Tagihan bruto kepada pelanggan                     2.370.146.227.175       2.669.957.088.202      2.632.142.539.473               Gross amount due from customers




                                                                              62
Page 66
                                                                                                            The original financial statements included herein are in
                                                                                                                                          the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                                             PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                                                     NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                                           JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                                        30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                                           ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                                          (UNAUDITED)

   Tagihan bruto kepada pelanggan berdasarkan umur                                              Aging of gross amounts due from customers is as
   adalah sebagai berikut:                                                                      follows:

                                                        30 Juni/             31 Desember/               30 Juni/
                                                        June 30              December 31,               June 30
                                                         2023                    2022                    2022
                                                          Rp                      Rp                      Rp
   < 1 bulan                                             73.157.714.283            205.766.892.563      201.009.153.719                                        < 1 Month
   1 bulan sampai < 6 bulan                              88.758.148.252            254.122.398.238      142.923.894.819                              1 Month < 6 Months
   6 bulan sampai < 12 bulan                            153.589.359.800             84.811.932.701      275.826.669.362                          6 Months to < 12 Months
   > 12 bulan                                         2.054.641.004.681          2.125.255.864.700    2.012.382.821.573                                      > 12 Months
                                                       2.370.146.227.016       2.669.957.088.202       2.632.142.539.473
   Dikurangi : Penyisihan Kerugian Penurunan Nilai   (2.026.383.258.177)     (1.976.002.800.528)     (2.054.276.046.385)           Less: Allowance for Impairment Losses
   Jumlah                                               343.762.968.839           693.954.287.674       577.866.493.088                                             Total


   Mutasi cadangan kerugian penurunan nilai                                                     Movements in the allowance for impairment losses

                                                        30 Juni/             31 Desember/               30 Juni/
                                                        June 30              December 31,               June 30
                                                         2023                    2022                    2022
                                                          Rp                      Rp                      Rp

   Saldo Awal                                         1.976.002.800.528          2.177.009.834.976    2.177.009.834.976                                 Beginning balance
   Penambahan PSAK 71 tahun berjalan (Catatan 29)       102.011.747.105            184.611.878.569                    --             Provision during the period (Note 29)
   Perubahan cadangan kerugian                                                                                                                  Change in loss allowance
      karena penyelesaian (Catatan 29)                 (51.631.289.297)          (385.618.913.017)    (122.733.788.591)                    due to settlement (Note 29)
                                                      2.026.383.258.336          1.976.002.800.528    2.054.276.046.385



   WBW – Proyek Pembangunan Jalan Tol Krian –                                                   WBW – The Development of Krian – Legundi –
   Legundi – Bunder – Manyar Pekerjaan Pile Slab                                                Bunder – Manyar Toll Road Pile Slab Project

   Perusahaan memperoleh kontrak pekerjaan untuk                                                The company obtained a work contract for the
   pembangunan Jalan Tol Krian – Legundi – Bunder –                                             construction of the Krian – Legundi – Bunder –
   Manyar       Pekerjaan      Pile      Slab       No.                                         Manyar Toll Road Pile Slab Work No.
   10/SPPJK/WBW/2016 pada tanggal 9 Desember                                                    10/SPPJK/WBW/2016 on December 9, 2016 with a
   2016      dengan      nilai    kontrak      sebesar                                          contract value of Rp3,047,328,854,507. This contract
   Rp3.047.328.854.507. Kontrak ini telah beberapa kali                                         has been amended several times. Based on pax`da
   mengalami     perubahan.     Berdasarkan     pax`da                                          addendum       to    the    2nd     contract,      No.
   addendum         kontrak      ke        2,       No.                                         04/ADD/SPPJK/WBW/2018 dated November 26,
   04/ADD/SPPJK/WBW/2018 tanggal 26 November                                                    2018 the payment method which was originally a
   2018 metode pembayaran yang semula turnkey                                                   turnkey has changed to a term with a payment
   berubah menjadi termin dengan mekanisme                                                      mechanism that is carried out monthly certificate (MC)
   pembayaran yang dilakukan secara sertifikat bulanan                                          according to progress. On June 30, 2023, the VI
   (MC) sesuai progres. Pada tanggal 30 Juni 2023 telah                                         addendum was carried out where sections 2 and 3
   dilakukan addendum ke-VI dimana seksi 2 dan 3                                                were handed over with the realization of the work
   diserahterimakan dengan realisasi progres pekerjaan                                          progress reaching 91.20%.
   mencapai 91,20%.

   CCTW – Proyek Pembangunan                                Jalan          Tol                  CCTW – Cimanggis                   Cibitung          Toll        Road
   Cimanggis Cibitung                                                                           Construction Project

   Perusahaan memperoleh kontrak pekerjaan untuk                                                The Company obtained a work contract for the
   pembangunan Jalan Tol Cimanggis Cibitung Seksi                                               construction of Cimanggis Cibitung Toll Road Section
   1A dengan No. 01/KJBP/CCT/2015 pada tanggal                                                  1A No. 01/KJBP/CCT/2015 on September 29, 2015
   29 September 2015 dengan nilai kontrak sebesar                                               with a contract value of Rp368,537,696,869. This
   Rp368.537.696.869. Kontrak ini telah beberapa kali                                           contract has been amended three times with
                                                                                 63
Page 67
                                                                           The original financial statements included herein are in
                                                                                                         the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                  PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                          NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                             30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                               (UNAUDITED)

   diadendum dengan No. 01/KJBP/ADDVIII/CCT/2019                 addendum No. 01/KJBP/ADDVIII/CCT/2019 dated
   tanggal 28 Juni 2019 dengan nilai kontrak                     June 28, 2019 with a contract value of
   menjadi sebesar Rp499.140.791.791. Berdasarkan                Rp499,140,791,791.       Based    on   the    latest
   Addendum terakhir No. 11.04/DUCCT/ADD/XV/2020                 Addendum No. 11.04/DU-CCT/ADD/XV/2020 dated
   tanggal 11 November 2020, dimana antara lain                  November 11, 2020, changes among others, include
   terdapat perubahan nilai kontrak menjadi sebesar              a    change      in    the   contract   value     to
   Rp518.162.721.713,      dengan    jangka     waktu            Rp518,162,721,713, with the work execution period
   pelaksanaan pekerjaan menjadi 31 Desember 2020.               being December 31, 2020. The payment method in
   Metode pembayaran yang digunakan pada kontrak                 the contract is using terms method. The progress of
   pekerjaan ini adalah dengan metode termin. Progres            the project has reached 100.00% and 99.84% as at
   dari proyek pekerjaan ini masing-masing per                   June 30, 2023 and December 31, 2022, respectively.
   30 Juni 2023 dan 31 Desember 2022 mencapai
   100,00% dan 99,84%.

   Perusahaan memperoleh kontrak pekerjaan untuk                 The company obtained a work contract for the
   pembangunan Jalan Tol Cimanggis Cibitung Seksi 2              construction of Section 2 of the Cimanggis Cibitung
   dengan No. 02/KJBP/CCT/2016 pada tanggal 29 Juni              Toll Road with No. 02/KJBP/CCT/2016 on June 29,
   2016      dengan      nilai    kontrak     sebesar            2016 with a contract value of Rp2,230,241,128,634.
   Rp2.230.241.128.634. Kontrak ini telah diubah                 This contract has been amended several times with
   beberapa       kali   dengan      adendum        No.          addendum No. 02/SPPJK/ADDIV/CCT/2019 dated
   02/SPPJK/ADDIV/CCT/2019 tanggal 22 April 2019                 April 22, 2019 with the contract value changed to
   dengan      nilai   kontrak     diubah     menjadi            Rp2,099,681,401,394. The period for carrying out the
   Rp2.099.681.401.394. Jangka waktu pelaksanaan                 work based on the contract ends on December 31,
   pekerjaan berdasarkan kontrak berakhir pada tanggal           2020. Based on Addendum XVNo. 28.02/DU-
   31 Desember 2020. Berdasarkan Addendum XV                     CCT/ADD/IV/2023 dated April 28, 2023, among
   No. 28.02/DU-CCT/ADD/IV/2023 tanggal 28 April                 others, changing the implementation period to
   2023 antara lain merubah jangka waktu pelaksanaan             October 30, 2023 and the contract value to
   menjadi 30 Oktober 2023 dan nilai kontrak menjadi             Rp2,525,965,112,965. The payment method used in
   Rp2.525.965.112.965. Metode pembayaran yang                   this work contract is the term method. The progress
   digunakan pada kontrak pekerjaan ini adalah dengan            of this work project as of June 30, 2023 reached
   metode termin. Progres dari proyek pekerjaan ini per          81.201%, December 31,2022 the work progress
   30 Juni 2023 mencapai 81,201%, untuk 31 Desember              76,21% and June 30, 2022 the wrk progress 75,02%.
   2022 progresnya mencapai 76,21% dan 30 Juni 2022
   progresnya mencapai 75,02%.

   PT Cibitung Tanjung Priok Tollways                            PT Cibitung Tanjung Priok Tollways

   Perusahaan     memperoleh       kontrak  pekerjaan            The Company obtained a contract for construction of
   Pembangunan Jalan Tol Cibitung Cilincing                      the Cibitung Cilincing Toll Road STA.30 + 200 -
   STA.30+200 – STA.32+800 dengan kontrak                        STA.32 + 800 with contract No. CTP-ADM-XII-2017-
   No.     CTP-ADM-XII-2017-WBP-00001          tanggal           WBP 00001 dated December 21, 2017. This contract
   21    Desember      2017.     Kontrak   ini    telah          has     been     amended      several     times   with
   diubah     beberapa    kali     dengan    adendum             addendum       No.     CTP-ADM-VI-2019-WBP-00003
   No.     CTP-ADM-VI-2019-WBP-00003           tanggal           dated June 27, 2019 with a value of
   27 Juni 2019 dengan nilai kontrak sebesar                     Rp570,012,552,891, excluding VAT. The period of
   Rp570.012.552.891 belum termasuk PPN. Jangka                  work starts from December 21, 2017 to
   waktu pekerjaan mulai 21 Desember 2017 sampai                 December 31, 2020, the payment mechanism is the
   dengan 31 Desember 2020, mekanisme pembayaran                 monthly progress system as evidenced by the
   adalah sistem progres bulanan yang dibuktikan                 Monthly Work Physical Progress Report. Based on
   dengan Laporan Progres Fisik Pekerjaan Bulanan.               the Cibitung Cilincing Toll Road Construction Work
   Berdasarkan      Surat      Perjanjian   Pekerjaan            Agreement         Letter      STA         30+200-STA
   Pembangunan Jalan Tol Cibitung Cilincing STA                  32+800 No. CTP-ADM-XI-2020-WBP-00006 dated
   30+200-STA 32+800 No CTP-ADM-XI-2020-WBP-                     November 25, 2020, the contract value was changed
   00006 tanggal 25 November 2020 telah disepakati               to Rp422,155,854,789, which was originally
   nilai kontrak sebesar Rp422.155.854.789 yang                  Rp633,866,883,733. Based on Addendum X to the
   semula Rp633.866.883.733. Berdasarkan Addendum                Work Agreement for the Cibitung Cilincing Toll Road
   X Surat Perjanjian Pekerjaan Pembangunan Jalan                STA 30+200-STA 32+800 No. CTP-ADM-I-2022-
   Tol Cibitung Cilincing STA 30+200-STA 32+800                  WBP-00011 dated January 28, 2022, changes among
   nomor CTP-ADM-I-2022-WBP-00011 tanggal 28                     others, include the time period for the implementation
   Januari 2022, dengan merubah antara lain terkait              of the work starting December 21, 2017 to
   jangka waktu pelaksanaan pekerjaan yang dimulai 21            July 31, 2022. Based on Addendum XI to the Cibitung
   Desember 2017 sampai dengan 31 Juli 2022.                     Cilincing Toll Road Construction Work Agreement

                                                          64
Page 68
                                                                             The original financial statements included herein are in
                                                                                                           the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                   PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                           NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                 JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                              30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                 ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                (UNAUDITED)

   Berdasarkan Adendum XI Surat Perjanjian Pekerjaan              STA 30+200-STA 32+800 No. CTP-ADM-VII-2022-
   Pembangunan Jalan Tol Cibitung Cilincing STA                   WBP-00012 dated July 29, 2022, the contract value
   30+200-STA 32+800 No. CTP-ADM-VII-2022-WBP-                    was agreed at Rp423,273,100,406 which was
   00012 tanggal 29 Juli 2022, telah disepakati nilai             originally Rp422,155.854,789 by changing, among
   kontrak sebesar Rp423.273.100.406 yang semula                  others, the implementation period of work starting
   Rp422.155.854.789 dengan merubah antara lain                   from December 21, 2017 to November 30, 2022. The
   terkait jangka waktu pelaksanaan pekerjaan yang                progress of this work project as of June 30, 2023
   dimulai 21 Desember 2017 sampai dengan                         reached 100%.
   31 November 2022. Progres dari proyek pekerjaan ini
   per 30 Juni 2023 mencapai 100%.

   PT Hakaaston - JTTS Pekanbaru - Dumai Seksi 1 -                PT Hakaaston - JTTS Pekanbaru - Dumai Seksi 1
   6                                                              –6

   Berdasarkan kontrak No. 008/SPPM/WBP/2018                      Based      on     the    JTTS       work    contract
   pekerjaan JTTS Pekanbaru - Dumai Seksi 1 sampai                No. 008/SPPM/WBP/2018 for Pekanbaru - Dumai
   dengan 6 pembuatan spun pile dengan kontrak awal               Sections 1 to 6 for making spun pile with
   senilai Rp241.607.360.000 dan telah mengalami tiga             an initial contract value of Rp241,607,360,000
   kali perubahan kontrak, dengan kontrak terakhir                 which    has    been   amended       three   times,
   No. Add.01/HKA/BY.317/S.PERJ.49/IX/2019 tanggal                most          recently         with         contract
   3 September 2019 dengan nilai on site pelabuhan                No. Add.01/HKA/BY.317/S.PERJ.49/IX/2019 dated
   Rp117.615.858.900. Adapun periode kontrak adalah               September 3, 2019, the site contract value amounted
   20 Juni 2019 sampai dengan 31 Oktober 2019.                    to Rp117,615,858,900. The contract period is from
   Proyek tersebut telah selesai 100% per 30 Juni 2023            June 20, 2019 to October 31, 2019. The project is
   dan 31 Desember 2022.                                          100% completeas of June 30, 2023 and December
                                                                  31, 2022

   PT Duta Graha Karya                                            PT Duta Graha Karya

   Perusahaan memperoleh kontrak berupa Pengadaan                 The Company obtained a contract in the form of
   dan persiapan pekerjaan dari PT Duta Graha Karya               procurement and work preparation from PT Duta
   dengan kontrak No. DGK/PO/01/22/00002 tanggal                  Graha Karya with contract no. DGK/PO/01/22/00002
   17    Februari    2022,    dengan     nilai   kontrak          dated February 17, 2022, with a contract value of
   Rp278.613.401.861 (Exc PPN 11%), untuk                         Rp278,613,401,861 (Excluding 11% VAT), for the
   pengadaan Produk Precast yaitu PCI Girder & Spun               procurement of Precast Products namely PCI Girder
   Pile untuk Proyek Tol Kataraja Seksi 1. Atas kontrak           & Spun Pile for the Kataraja Toll Road Project Section
   tersebut, progress Proyek Tol Kataraja Seksi 1 per             1. Based on the contract, the progress of the Kataraja
   30 Juni 2023 sebesar Rp73.863.072.796 atau                     Toll Road Project Section 1 as of June 30, 2023,
   26,51%. Sedangkan untuk pencatatan piutang usaha               amounted to Rp73,863,072,796 or 26.51%.
   sampai dengan 30 Juni 2023 mencapai                            Meanwhile, the recording of account receivable up to
   Rp60.422.863.178 atau 21,69%. Pada Mei Tahun                   June 30, 2023, reached Rp60,422,863,178 or
   2023 yaitu sampai dengan 30 Juni 2023 progress                 21.69%. In May 2023, namely until June 30, 2023 the
   Proyek      Tol     Kataraja     Seksi      1     per          progress of the Kataraja Toll Road Section 1 Project
   sebesar Rp87.753.121.713 atau 31,50%.Sedangkan                 peramounting to Rp87,753,121,713 or 31.50%.
   untuk pencatatan piutang usaha sampai dengan 30                Meanwhile, for the recording of trade receivables up
   Juni 2023 mencapai Rp82.473.424.054 atau                       to June 30, 2023 it reached Rp82,473,424,054 or
   29,6%.Selisih Progress dengan Piutang Usaha                    29.6%. The difference between Progress and
   didapat dari harga satuan produk onsite PCI GIRDER             Accounts Receivable was obtained from the unit price
   dengan volume 65 balok yang belum terbit invoice.              of the PCI GIRDER onsite product with a volume of
   Hal tersebut terjadi karena sistem SAP PT Waskita              65 blocks invoice has not been issued. This
   Beton Precast sudah terprogress 65% harga satuan               happened because PT Waskita Beton Precast's SAP
   produk setiap produk terkirim on site, sedangkan               system had progressed 65% of the product unit price
   yang baru di invoice kan (BAP dari pihak PT Duta               for each product sent on site, while those that had just
   Graha Karya) membukukan porsi 50% dari harga                   been invoiced (BAP from PT Duta Graha Karya)
   satuan produk.                                                 accounted for 50% of the product unit price.

   PT Kresna Kusuma Dyandra Marga                                 PT Kresna Kusuma Dyandra Marga

   Perusahaan    memperoleh     kontrak   pekerjaan               The Company obtained a construction contract for the
   Pembangunan Jalan Tol Bekasi - Cawang -                        Bekasi - Cawang - Kampung Melayu (BECAKAYU)
   Kampung Melayu (BECAKAYU) dengan kontrak                       Toll Road with contract No. 92/S.Per/KKDM/III/2019
   No. 92/S.Per/KKDM/III/2019 tanggal 15 Maret 2019               dated March 15, 2019 with contract value of

                                                           65
Page 69
                                                                               The original financial statements included herein are in
                                                                                                             the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                      PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                              NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                    JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                 30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                    ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                   (UNAUDITED)

   dengan nilai kontrak sebesar Rp63.634.402.530.                    Rp63,634,402,530. The work period starts from
   Jangka waktu pekerjaan mulai 8 April 2019 sampai                  April 8, 2019 to August 22, 2019. The contract has
   dengan 22 Agustus 2019. Kontrak telah diubah                      been amended several times most recently by
   beberapa    kali  terakhir  dengan     addendum                   addendum No. 103/ADD-VIII/S.Per/KKDM/II/2022
   No.   103/ADD-VIII/S.Per/KKDM/II/2022     tanggal                 dated February 21, 2022, where the extension of time
   21 Februari 2022, dimana perpanjangan waktu                       is up to June 30 2022 with a contract value of
   sampai dengan 30 Juni 2022 dengan nilai kontrak                   Rp76,057,857,105 (change in contract value
   menjadi Rp76.057.857.105 (perubahan nilai kontrak                 in addendum 3). The work progress has reached
   pada adendum 3). Progres pekerjaan mencapai                       100.00%.
   100.00%.

   Perusahaan memperoleh kontrak untuk Pekerjaan                     The company obtained a contract for the Jatiwaringin
   Proyek Arteri dan Jembatan Akses Jatiwaringin                     Access Arterial and Bridge Project Work with SPK No.
   dengan SPK No. 314/S.Per/KKDM/VI/2020 tanggal                     314/S.Per/KKDM/VI/2020 dated June 19, 2020 with
   19    Juni     2020     dengan    kontrak   senilai               a    contract     worth      Rp50,916,423,038,      the
   Rp50.916.423.038, yang jangka waktu pelaksanaan                   implementation period of which starts from 22 June
   mulai dari 22 Juni 2020 sampai dengan 19 Desember                 2020 to 19 December 2020. However, based on the
   2020.          Namun         atas        addendum                 addendum No. 314/S.Per/KKDM/VI/2020 in the
   No          314/S.Per/KKDM/VI/2020          senilai               amount of Rp50,916,423,038 an addendum has been
   Rp50.916.423.038 telah dilakukan adendum kembali                  made again with No. 1549/ADD-III/ S.Per/ KKDM/
   dengan No. 1549/ADD-III/S.Per/KKDM/XII/2021                       XII/2021 dated December 6, 2021, where the time
   tanggal 6 Desember 2021, dimana perpanjangan                      extension is up to April 27, 2022 with a contract value
   waktu sampai dengan 27 April 2022 dengan nilai                    of Rp57,857,094,362 (change in contract value in
   kontrak menjadi Rp57.857.094.362 (perubahan nilai                 addendum 3). Based on addendum 5 with No.
   kontrak pada addendum 3). Berdasarkan addendum                    314/S.Per/KKDM/VI/2020 dated June 19, 2020 the
   5 dengan No. 314/S.Per/KKDM/VI/2020 tanggal 19                    implementation period was extended from June 22,
   Juni 2020 waktu pelaksanaan diperpanjang dari 22                  2020 to June 18, 2022. Work progress as of
   Juni 2020 hingga 18 Juni 2022. Progres pekerjaan                  December 31, 2022 reached 100%
   per 31 Desember 2022 mencapai 100%.

   PT Panahome Deltamas Indonesia                                    PT Panahome Deltamas Indonesia

   Perusahaan menandatangani Perjanjian Kontrak                      The company signed a Work Contract Agreement No.
   Kerja No. 001/PHDI/KK/I/ 2022 tanggal 6 Januari                   001/PHDI/KK/I/ 2022 dated January 6, 2021 with PT
   2021 dengan PT Panahome Deltamas Indonesia                        Panahome Deltamas Indonesia for the Construction
   untuk atas Pekerjaan Pembangunan Rumah Type B                     of Premium Type B Houses, Jalan ASA 3 No. 1, 2, 3,
   Premium, Jalan ASA 3 No. 1, 2, 3, 4, 5, 6, 7, 8, 9,10,            4, 5, 6, 7, 8, 9,10, 12 ASA Clusters in the SAVASA
   12 Cluster ASA pada proyek SAVASA yang terletak                   project located in the city of Deltamas, Jalan Raya
   di kota Deltamas, Jalan Raya Boulevard, Desa                      Boulevard, Hegarmukti Village and Pasirraji Village,
   Hegarmukti dan Desa Pasirraji, Kecamatan Cikarang                 Central Cikarang District, Bekasi Regency, with for a
   Pusat, Kabupaten Bekasi, dengan jangka waktu 6                    period of January 6, 2022 to June 30, 2022 with a
   Januari 2022 sampai dengan 30 Juni 2022 dengan                    contract value of Rp5,247,288,200 for 10 housing
   nilai kontrak sebesar Rp5.247.288.200 untuk 10 unit               units. The contract value includes VAT and income
   Rumah. Nilai kontrak tersebut sudah termasuk PPN                  tax, the nature of the contract that applies in this
   dan PPh, sifat kontrak yang berlaku dalam perjanjian              agreement is the Lump Sum Fix Price. This
   ini adalah Lump Sum Fix Price. Perjanjian ini telah               agreement has been amended with No.
   diadendum dengan No. 001/PHDI/ADD-KK/V/2022                       001/PHDI/ADD-KK/V/2022 dated May 18, 2022,
   tanggal 18 Mei 2022, perubahan atas PPN dari 10%                  changes in VAT from 10% to 11%, so the contract
   menjadi 11%, sehingga nilai kontrak menjadi                       value becomes Rp5,294,990,820. Based on
   Rp5.294.990.820. Berdasarkan addendum 2 dengan                    addendum 2 with addendum No. 020/PHDI/ADD-
   addendum No. 020/PHDI/ADD-KK/VII/2022 tanggal 4                   KK/VII/2022 dated July 4, 2022 the implementation
   Juli 2022 waktu pelaksanaan diperpanjang dari 6                   period was extended from January 6, 2022 to July 30,
   Januari 2022 sampai dengan 30 Juli 2022. Perjanjian               2022. This agreement has been amended with
   ini telah diadendum dengan nomor 001/PHDI/AD-                     number 001/PHDI/AD-KK/XII/2022 dated December
   KK/XII/2022 tanggal 20 Desember 2022 atas kerja                   20, 2022 on added work so that the contract value
   tambah       sehingga    nilai   kontrak      menjadi             becomes Rp5,589,767,970.
   Rp5.589.767.970.

   Perusahaan menandatangani Perjanjian Kontrak                      The company signed a Work Contract Agreement No.
   Kerja No. 002/PHDI/KK/I/2022 tanggal 6 Januari                    002/PHDI/KK/I/2022 dated January 6, 2021 with PT
   2021 dengan PT Panahome Deltamas Indonesia                        Panahome Deltamas Indonesia for Type B Deluxe
   untuk Pekerjaan Pembangunan Rumah Type B                          House Construction Work, Jalan ASA 5 No. 1, 2, 3, 4,
   Deluxe, Jalan ASA 5 No. 1, 2, 3, 4, 5, 6, 7, 8, 9,10, 12          5, 6, 7, 8, 9,10, 12 ASA Clusters in the SAVASA
                                                              66
Page 70
                                                                           The original financial statements included herein are in
                                                                                                         the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                  PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                          NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                             30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                               (UNAUDITED)

   Cluster ASA pada proyek SAVASA yang terletak di               project located in the city of Deltamas, Jalan Raya
   kota Deltamas, Jalan Raya Boulevard, Desa                     Boulevard, Hegarmukti Village and Pasirraji Village,
   Hegarmukti dan Desa Pasirraji, Kecamatan Cikarang             Central Cikarang District, Bekasi Regency, with for a
   Pusat, Kabupaten Bekasi, dengan jangka waktu 6                period of January 6 2022 to August 31, 2022 with a
   Januari 2022 sampai dengan 31 Agustus 2022                    contract value of Rp4,642,128,700 for 10 housing
   dengan nilai kontrak sebesar Rp4.642.128.700 untuk            units. The contract value includes VAT and income
   10 unit Rumah. Nilai kontrak tersebut sudah termasuk          tax. The nature of the contract that applies in this
   PPN dan PPh. Sifat kontrak yang berlaku dalam                 agreement is the Lump Sum Fix Price. This
   perjanjian ini adalah Lump Sum Fix Price. Perjanjian          agreement has been amended with No.
   ini telah diadendum dengan No. 002/PHDI/ADD-                  002/PHDI/ADD-KK/V/2022 dated May 18, 2022,
   KK/V/2022 tanggal 18 Mei 2022, perubahan atas                 changes in VAT from 10% to 11%, so the contract
   PPN dari 10% menjadi 11%, sehingga nilai kontrak              value becomes Rp4,684,329,870. Based on the
   menjadi Rp4.684.329.870. Berdasarkan addendum                 addendum number 002/PHDI/AD-KK/XII/2022 dated
   dengan nomor 002/PHDI/AD-KK/XII/2022 tanggal 20               December 20, 2022 for additional work so that the
   Desember 2022 atas kerja tambah sehingga nilai                contract value becomes Rp4,961,617,860
   kontrak menjadi Rp4.961.617.860.

   Perusahaan menandatangani Perjanjian Kontrak                  The company signed a Work Contract Agreement No.
   Kerja No. 003/PHDI/KK/I/2022 tanggal 6 Januari                003/PHDI/KK/I/2022 dated January 6, 2021 with PT
   2021 dengan PT Panahome Deltamas Indonesia                    Panahome Deltamas Indonesia for Type D House
   untuk Pekerjaan Pembangunan Rumah Type D,                     Construction Work, Jalan ASA 10 No. 1 and ASA No
   Jalan ASA 10 No. 1 dan ASA No 2, 28 Cluster ASA               2, 28 ASA Cluster in the SAVASA project located in
   pada proyek SAVASA yang terletak di kota Deltamas,            the city of Deltamas, Jalan Raya Boulevard,
   Jalan Raya Boulevard, Desa Hegarmukti dan Desa                Hegarmukti Village and Pasirraji Village, Central
   Pasirraji, Kecamatan Cikarang Pusat, Kabupaten                Cikarang District, Bekasi Regency, with a term of
   Bekasi, dengan jangka waktu 6 Januari 2022 sampai             January 6, 2022 to September 30, 2022 with a
   dengan 30 September 2022 dengan nilai kontrak                 contract value of Rp2,837,583,100 for 3 housing
   sebesar Rp2.837.583.100 untuk 3 unit Rumah. Nilai             units. The contract value includes VAT and income
   kontrak tersebut sudah termasuk PPN dan PPh. Sifat            tax. The nature of the contract that applies in this
   kontrak yang berlaku dalam perjanjian ini adalah              agreement is the Lump Sum Fix Price. This
   Lump Sum Fix Price. Perjanjian ini telah diadendum            agreement has been amended with No.
   dengan No. 003/PHDI/ADD-KK/V/2022 tanggal 18                  003/PHDI/ADD-KK/V/2022 dated May 18, 2022,
   Mei 2022, perubahan atas PPN dari 10% menjadi                 changes in VAT from 10% to 11%, so the contract
   11%,       sehingga     nilai  kontrak      menjadi           value becomes Rp2,863,379,310. Based on
   Rp2.863.379.310. Berdasarkan addendum dengan                  addendum number 003/PHDI/AD-KK/XII/2022 dated
   nomor      003/PHDI/AD-KK/XII/2022     tanggal   20           December 20, 2022 for additional work so that the
   Desember 2022 atas kerja tambah sehingga nilai                contract value becomes Rp2,983,173,174.
   kontrak menjadi Rp2.983.173.174.

   Atas 3 Perjanjian diatas, progress pekerjaan Proyek           Based on the 3 agreements above, the progress of
   Pembangunan Perumahan Savasa sampai 30 Juni                   the Savasa Housing Development Project until June
   2023 sebesar Rp12.193.296.400 atau 100%.                      30, 2023 is Rp12,193,296,400 or 100%.

   PT Waskita Karya (Persero) Tbk – KAPB                         PT Waskita Karya (Persero) Tbk – KAPB

   Perusahaan menandatangani kontrak dengan                      The      Company     signed  a     contract   with
   PT Waskita Karya (Persero) Tbk untuk proyek Tol               PT Waskita Karya (Persero) Tbk for the Kayu Agung
   Kayu Agung - Palembang - Betung (KAPB) untuk item             - Palembang - Betung (KAPB) Toll Road project for
   sebagai berikut:                                              the following items:

   Perusahaan menandatangani kontrak pengadaan                   The company signed the Spunpile procurement
   Spunpile    No     97.7/SPPM/WK/SCM/WAG/2021                  contract No 97.7/SPPM/WK/SCM/WAG/2021 dated
   tanggal 26 Oktober 2021 untuk Suply ke Proyek Tol             October 26, 2021 for supply to the KAPB Toll Road
   KAPB Tahap 2 Paket II Seksi 3 yang terletak di                Project Phase 2 Package II Section 3 which is located
   Kecamatan Banyuasin Provinsi Sumatera Selatan                 in Banyuasin District, South Sumatra Province with a
   dengan jangka waktu dari 26 Oktober hingga 31                 period from October 26 to December 31, 2021 with a
   Desember      2021      dengan    nilai   kontrak             contract value of Rp61,537,845,600 including VAT.
   Rp61.537.845.600 termasuk PPN. Perjanjian telah               The agreement has been amended with
   diadendum dengan No.97.7/ADD.VI/SPPM/WK/                      No.97.7/ADD.VI/SPPM/WK/SCM/WAG/2022 dated
   SCM/WAG/2022 tanggal 25 Juli 2022 dengan                      July 25, 2022 with a change in the procurement
   perubahan jangka pengadaan hingga 31 Agustus                  period until August 31, 2022 and a change in VAT
   2022 dan perubahan atas PPN dari 10% menjadi                  from 10% to 11%. As of December 31, 2022 progress
                                                                 has reached 100%.
                                                          67
Page 71
                                                                           The original financial statements included herein are in
                                                                                                         the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                  PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                          NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                             30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                               (UNAUDITED)

   11%. Per 31 Desember 2022 progres sudah
   mencapai 100%.

   Perusahaan menandatangani kontrak pengadaan                   The company signed the Spunpile procurement
   Spunpile    No     95.2/SPPM/WK/SCM/WAG/2021                  contract No 95.2/SPPM/WK/SCM/WAG/2021 dated
   tanggal 26 Oktober 2021 untuk Suply ke Proyek Tol             October 26, 2021 for supply to the KAPB Toll Road
   KAPB Tahap 2 Paket IV Seksi 3B yang terletak di               Project Phase 2 Package IV Section 3B which is
   Kecamatan Banyuasin Provinsi Sumatera Selatan                 located in Banyuasin District, South Sumatra
   dengan jangka waktu dari 26 Oktober hingga 31                 Province with a period from October 26 to December
   Desember      2021      dengan    nilai   kontrak             31, 2021 with a contract value of Rp35,108,304,000
   Rp35.108.304.000 termasuk PPN. Perjanjian telah               including VAT. The agreement has been amended
   diadendum dengan No. 95.2/ADD.V/SPPM/WK/                      with No. 95.2/ADD.V/SPPM/WK/ SCM/WAG/2022
   SCM/WAG/2022 tanggal 9 Mei 2022 dengan                        dated May 9, 2022 with changes to the procurement
   perubahan jangka pengadaan hingga 31 Juli 2022                period until July 31, 2022 and changes to VAT from
   dan perubahan atas PPN dari 10% menjadi 11%. Per              10% to 11%. As of December 31, 2022 progress has
   31 Desember 2022 progress sudah mencapai 100%.                reached 100%.

   Perusahaan menandatangani kontrak pengadaan                   The company signed a Full Slab procurement
   Full Slab No 129.1/SPPM/WK/SCM/WAG/2022                       contract No 129.1/SPPM/WK/SCM/WAG/2022 dated
   tanggal 14 April 2022 untuk Suply ke Proyek Tol               April 14, 2022 for supply to the KAPB Toll Road
   KAPB Tahap 2 Paket II Seksi 3 yang terletak di                Project Phase 2 Package II Section 3 which is located
   Kecamatan Banyuasin Provinsi Sumatera Selatan                 in Banyuasin District, South Sumatra Province with a
   dengan jangka waktu dari 14 April 2022 hingga 30              period from April 14, 2022 to June 30, 2022 at
   Juni     2022        dengan       nilai   kontrak             contract value Rp129,462,839,035 including VAT.
   Rp129.462.839.035 termasuk PPN. Perjanjian telah              The agreement has been amended with No.
   diadendum dengan No. 129.1/ADD.V/SPPM/WK/                     129.1/ADD.V/SPPM/WK/ SCM/WAG/2022 dated
   SCM/WAG/2022 tanggal 28 Desember 2022 dengan                  December 28, 2022 with changes to the procurement
   perubahan jangka pengadaan hingga 31 Desember                 period until December 31, 2022. Progress as of
   2022. Progres per 28 Februari 2023 mencapai 100%.             February 28, 2023 reached 100%.

   Perusahaan menandatangani kontrak pengadaan                   The company signed a Full Slab procurement
   Full Slab No 129.2/SPPM/WK/SCM/WAG/2022                       contract No 129.2/SPPM/WK/SCM/WAG/2022 dated
   tanggal 14 April 2022 untuk Suply ke Proyek Tol               April 14, 2022 for supply to the KAPB Toll Road
   KAPB Tahap 2 Paket IV Seksi 3B yang terletak di               Project Phase 2 Package IV Section 3B which is
   Kecamatan Banyuasin Provinsi Sumatera Selatan                 located in Banyuasin District, South Sumatra
   dengan jangka waktu dari 14 April 2022 hingga 30              Province with a period from April 14, 2022 to June 30,
   Juni 2022 dengan nilai kontrak Rp53.086.176.407               2022 with a contract value of Rp53,086,176,407
   termasuk PPN. Sampai saat ini perjanjian telah                including VAT. Until now, the agreement has been
   diadendum dengan No. 129.2/ADD.IV/SPPM/WK/                    amended      with    No.   129.2/ADD.IV/SPPM/WK/
   SCM/WAG/2022 tanggal 29 Agustus 2022 dengan                   SCM/WAG/2022 dated August 29, 2022 with changes
   perubahan jangka pengadaan hingga 31 Desember                 to the procurement period until December 31, 2022.
   2022. Progress per 31 Maret 2023 mencapai 100%.               Progress as of March 31, 2023 reached 100%.

   Perusahaan menandatangani kontrak Pekerjaan                   The company signed the Slab On Pile Work contract
   Slab On Pile No 122/SPPP/WK/SCM/WAG/2022                      No 122/SPPP/WK/SCM/WAG/2022 dated April 5,
   tanggal 5 April 2022 untuk Pekerjaan ke Proyek Tol            2022 for the Work to the KAPB Toll Road Project
   KAPB Tahap 2 Paket II Seksi 3 yang terletak di                Phase 2 Package II Section 3 which is located in
   Kecamatan Banyuasin Provinsi Sumatera Selatan                 Banyuasin District, South Sumatra Province with a
   dengan jangka waktu dari 5 April 2022 hingga 30               term of April 5, 2022 until September 30, 2022 at the
   September       2022    dengan      nilai   kontrak           contract value Rp109,524,186,846 including VAT and
   Rp109.524.186.846 termasuk PPN dan PPh.                       income tax. The agreement has been amended with
   Perjanjian   telah    diadendum      dengan      No.          No. 122/ADD.VI/SPPM/WK/SCM/WAG/2022 dated
   122/ADD.VI/SPPM/WK/SCM/WAG/2022 tanggal 5                     May 5, 2023 with changes to the implementation
   Mei 2023 dengan perubahan jangka waktu                        period until July 7, 2023. Progress as of June 30.
   pelaksanaan hingga 7 Juli 2023. Progress per 30 Juni          2023 reached 92.57%.
   2023 mencapai 92,57%.

   Perusahaan menandatangani kontrak Pekerjaan                   The company signed the Slab On Pile Work contract
   Slab On Pile No 123/SPPP/WK/SCM/WAG/2022                      No 123/SPPP/WK/SCM/WAG/2022 dated April 5,
   tanggal 5 April 2022 untuk Pekerjaan ke Proyek Tol            2022 for the Work to the KAPB Toll Road Project
   KAPB Tahap 2 Paket IV Seksi 3B yang terletak di               Phase 2 Package IV Section 3B which is located in
   Kecamatan Banyuasin Provinsi Sumatera Selatan                 Banyuasin District, South Sumatra Province with a

                                                          68
Page 72
                                                                         The original financial statements included herein are in
                                                                                                       the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                        NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022              JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                           30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                              ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                             (UNAUDITED)

   dengan jangka waktu dari 5 April 2022 hingga 31             term of April 5, 2022 until December 31, 2022 with a
   Desember      2022     dengan    nilai   kontrak            contract value of Rp60,919,656,818 including VAT
   Rp60.919.656.818 termasuk PPN dan PPh.                      and income tax. The agreement has been amended
   Perjanjian     telah     diadendum       dengan             with No. 123/ADD.IV/SPPM/WK/SCM/WAG/2022
   No. 123/ADD.IV/SPPM/WK/SCM/WAG/2022 tanggal                 dated February 20, 2023 with changes in volume so
   20 Februari 2023 dengan perubahan volume                    that the contract value becomes Rp32,695,445,362
   sehingga nilai kontrak menjadi Rp32.695.445.362             including VAT and income tax. Progress as of
   termasuk PPN dan PPh. Progress per 28 Februari              February 28, 2023 reached 100%.
   2023 mencapai 100%.

   Perusahaan menandatangani kontrak pengadaan                 The company signed the Spunpile procurement
   Spunpile No 231/SPPM/WK/SCM/WAG/2022 tanggal                contract No 231/SPPM/WK/SCM/WAG/2022 dated
   26 Juli 2022 untuk Suply ke Proyek Tol KAPB Tahap           July 26, 2022 for supply to the KAPB Toll Road
   2 Paket II Seksi 3 yang terletak di Kecamatan               Project Phase 2 Package II Section 3 which is located
   Banyuasin Provinsi Sumatera Selatan dengan jangka           in Banyuasin District, South Sumatra Province with a
   waktu dari 26 Juli 2022 hingga 31 Oktober 2022              period from July 26, 2022 to October 31. 2022 with a
   dengan nilai kontrak Rp10.241.501.357 termasuk              contract value of Rp10,241,501,357 including VAT.
   PPN.     Perjanjian  telah    diadendum    dengan           The     agreement      has   been    amended       by
   231/ADD.II/SPPM/WK/SCM/WAG/2022 tanggal 30                  231/ADD.II/SPPM/WK/SCM/WAG/2022                 dated
   November 2022 dengan perubahan jangka waktu                 November 30, 2022 with changes to the
   pelaksanaan hingga 30 November 2022. Progres                implementation period until November 30, 2022.
   pekerjaan per 31 Maret 2023 mencapai 100%.                  Work progress as of March 31, 2023 reached 100%.

   Perusahaan menandatangani kontrak pengadaan                 The company signed a procurement contract for
   Spunpile dan Full Slab No. 233.1/SPPM/WK/SCM/               Spunpile and Full Slab No. 233.1/SPPM/WK/
   WAG/2022 tanggal 26 Juli 2022 untuk Suply ke                SCM/WAG/2022 dated July 26, 2022 for supply to
   Proyek Tol KAPB Tahap 2 Paket II Seksi 2 yang               the KAPB Toll Road Project Phase 2 Package II
   terletak di Kecamatan Banyuasin Provinsi Sumatera           Section 2 located in Banyuasin District, South
   Selatan dengan jangka waktu dari 26 Juli 2022               Sumatra Province with a period from July 26, 2022 to
   hingga 23 Oktober 2022 dengan nilai kontrak                 October 23, 2022 with a contract value of
   Rp18.734.734.867 termasuk PPN. Perjanjian telah             Rp18,734,734,867 including VAT. The agreement
   diadendum dengan 233.1/ADD.01/SPPM/WK/SCM/                  has been amended by 233.1/ADD.01/SPPM/WK/
   WAG/2022 tanggal 18 Oktober 2022 dengan                     SCM/WAG/2022 dated October 18, 2022 with a
   perubahan jangka waktu pelaksanaan hingga 31                change in the implementation period to December 31,
   Desember 2022. Progres pekerjaan sampai dengan              2022. Work progress up to December 31, 2022 has
   31 Desember 2022 mencapai 100%.                             reached 100%.

   Perusahaan menandatangani kontrak Pekerjaan                 The company signed the Slab On Pile Work contract
   Slab On Pile No 340/SPPP/WK/SCM/WAG/2022                    No 340/SPPP/WK/SCM/WAG/2022 dated October 7,
   tanggal 7 Oktober 2022 untuk Pekerjaan ke Proyek            2022 for the Work to the KAPB Toll Road Project
   Tol KAPB Tahap 2 Paket II Seksi 2 yang terletak di          Phase 2 Package II Section 2 which is located in
   Kecamatan Banyuasin Provinsi Sumatera Selatan               Banyuasin District, South Sumatra Province with a
   dengan jangka waktu dari 7 Oktober 2022 hingga 20           period from October 7, 2022 until December 20, 2022
   Desember      2022     dengan     nilai    kontrak          with a contract value of Rp6,361,233,288, - including
   Rp6.361.233.288,- termasuk PPN dan PPh.                     VAT and income tax. The agreement has been
   Perjanjian     telah      diadendum        dengan           amended                    with                   No.
   No. 340/ADD.I/SPPP/WK/SCM/WAG/2022 tanggal                  340/ADD.I/SPPP/WK/SCM/WAG/2022                  dated
   20 Desember 2022 dengan perubahan volume                    December 20, 2022 with changes in volume so that
   sehingga nilai kontrak menjadi Rp5.266.284.888,-            the contract value becomes Rp5,266,284,888
   termasuk PPN dan PPh. Progress per 31 Januari               including VAT and income tax. Progress as of
   2023 mencapai 100%.                                         January 31, 2023 reached 100%.

   PT Waskita Karya (Persero) Tbk – Proyek Rusun               PT Waskita Karya (Persero) Tbk – Proyek Rusun
   Kupang                                                      Kupang

   Perusahaan memperoleh kontrak pekerjaan untuk               The company obtained work contracts for the
   pembangunan 169 Perumahan Rumah Khusus di                   construction of 169 Special Housing Housing in
   Kabupaten Kupang yaitu sejumlah 124 Unit Desa               Kupang Regency, namely a total of 124 Saukibe
   Saukibe dan 45 Unit Desa Bokong dengan Kontrak              Village Units and 45 Bokong Village Units with
   066/SPPP/WK/SCM/WAF/ 2021 pada tanggal 21                   Contract 066/SPPP/WK/SCM/WAF/2021 on October
   Oktober 2021 dengan nilai kontrak sebesar                   21, 2021 with a contract value of Rp60,259,759. 592,
   Rp60.259.759.592, (diluar PPN). Kontrak ini telah           (excluding VAT). This contract has been amended
   beberapa kali mengalami perubahan. Berdasarkan              several times. Based on addendum 1, No. 066/Add-
                                                        69
Page 73
                                                                             The original financial statements included herein are in
                                                                                                           the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                    PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                            NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                  JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                               30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                  ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                 (UNAUDITED)

   pada addendum ke 1, No. 066/Add-1/SPPP/SCM/                     1/SPPP/SCM/WAF/2021 November 18, 2021
   WAF/2021 tanggal 18 November 2021 perubahan                     changes to the payment procedure from back to back
   tata cara pembayaran dari Back to back 30 hari                  30 days work calendar after PT Waskita Karya
   Kalender kerja setelah PT Waskita Karya (Persero)               (Persero) Tbk received payment from owner (Ministry
   Tbk dapat Pembayaran dari Owner (Kementerian                    of PUPR) to Monthly Certificate (MC) according to
   PUPR) ke Monthly Certificate (MC) sesuai progres                work progress. After that there was a change in the
   pekerjaan. Setelah itu ada perubahan nilai kontrak di           value of the contract in the 6th Addendum, No.
   Addendum ke 6, No. 066/Add-6/SPPP/SCM/WAF/                      066/Add-6/SPPP/SCM/WAF/2022 dated May 27,
   2022 tanggal 27 Mei 2022 dari Nilai kontrak                     2022 from the contract value of Rp60,259,759,592
   Rp60.259.759.592,        (diluar   PPN)      menjadi            (excluding VAT) to IDR 65,884,850,899. Based on the
   Rp65.884.850.899. Berdasarkan Addendum ke-7 No.                 7th Addendum No. 066/Add-7/SPPP/SCM/WAF/
   066/Add-7/SPPP/SCM/WAF/2022 tanggal 28 Juli                     2022 dated July 28, 2022, the change in the
   2022, perubahan jangka waktu pelaksanaan telah                  implementation period has been amended to October
   diubah sampai dengan 31 Oktober 2022.                           31, 2022. Based on the 8th Addendum No 066/Add-
   Berdasarkan Addendum ke-8 No 066/Add-                           8/SPPP/SCM/WAF/2022 Date October 28, 2022
   8/SPPP/SCM/WAF/2022 Tanggal 28 Oktober 2022                     there is a change in the implementation period up to
   ada perubahan jangak waktu pelaksanaan sampai                   December 31, 2022. Based on the 9th Addendum no
   dengan 31 Desember 2022. Berdasarkan Addendum                   066/Add-9/SPPP/SCM/WAF/2022 regarding the
   ke-9 no 066/Add-9/SPPP/SCM/WAF/2022 terkait                     Final Contract Value of Rp67,618,489,813,-
   Nilai Kontrak Final senilai Rp67.618.489.813,- (diluar          (excluding VAT) and extension of the contract period
   PPN) dan perpanjangan waktu contras sampai                      until June 30, 2023 on December 28, 2022. After that
   dengan 30 Juni 2023 pada tanggal 28 Desember                    there was a change in the Official's signature in the
   2022. Setelah itu terdapat perubahan tanda tangan               10th     Addendum       contract    No.     066/Add-
   Pejabat di kontrak Addendum ke 10 No. 066/Add-                  10/SPPP/SCM/WAF/2023 dated January 26, 2023.
   10/SPPP/SCM/WAF/2023 tanggal 26 Januari 2023.                   Work progress as of January 31, 2023 reached 100%.
   Progres pekerjaan per 31 Januari 2023 mencapai
   100%.

   PT Waskita Karya (Persero) Tbk – Pengadaan                      PT Waskita Karya (Persero) Tbk – Procurement of
   CCSP untuk Proyek Jalan Tol Krian – Legundi –                   CCSP for the Krian – Legundi – Bunder – Manyar
   Bunder – Manyar (KLBM Seksi 2)                                  Toll Road Project (KLBM Section 2)

   Perusahaan      memperoleh      kontrak    pekerjaan            The company obtained a work contract for the
   pengadaan Concrete Corrugated Sheet Piles (CCSP)                procurement of Concrete Corrugated Sheet Piles
   untuk Proyek Jalan Tol Krian-Legundi-Bunder-                    (CCSP) for the Krian-Legundi-Bunder-Manyar Toll
   Manyar         (KLBM        Seksi       2)       No.            Road      Project    (KLBM       Section    2)   No.
   70/SPPM/WK/SCM/WAG/2022 pada tanggal 4 Maret                    70/SPPM/WK/SCM/WAG/2022 on March 4, 2022
   2022 dengan nilai kontrak sebesar Rp6.470.850.000               with a contract value of Rp6,470,850,000 (excluding
   (belum termasuk PPN 10%) dan jangka waktu                       10% VAT) and the implementation period is up to
   pelaksanaan sampai dengan 30 Juni 2022. Kontrak                 June 30, 2022. This contract has been amended 2
   ini telah mengalami perubahan sebanyak 2 kali.                  times. Based on the 1st contract addendum, No.
   Berdasarkan pada addendum kontrak ke 1, No.                     70/ADD.I/SPPM/WK/SCM/WAG/2022 dated May 30,
   70/ADD.I/SPPM/WK/SCM/WAG/2022 tanggal 30 Mei                    2022 with the contract value having been amended to
   2022 dengan nilai kontrak telah diubah menjadi                  Rp6,062,730,000 (excluding 11% VAT) with an
   Rp6.062.730.000 (belum termasuk PPN 11%)                        implementation period of up to June 30, 2022. Based
   dengan jangka pelaksanaan sampai dengan 30 Juni                 on    the    contract    addendum       to   2,  No.
   2022. Berdasarkan pada addendum kontrak ke 2, No.               70/ADD.II/SPPM/WK/SCM/WAG/2022 dated June
   70/ADD.II/SPPM/WK/SCM/WAG/2022 tanggal 30                       30, 2022 with the contract value having been changed
   Juni 2022 dengan nilai kontrak telah diubah menjadi             to Rp7,783,815,000 (excluding 11% VAT) with an
   Rp7.783.815.000 (belum termasuk PPN 11%)                        implementation period of up to September 12, 2022.
   dengan jangka pelaksanaan sampai dengan 12                      The payment mechanism is made is a term method
   September 2022. Mekanisme pembayaran yang                       with a payment mechanism according to the progress
   dilakukan adalah metode termin dengan mekanisme                 of the regular 90-day payment scheme. Work
   pembayaran sesuai progres skema pembayaran 90                   presentation as of December 31, 2022 reached
   hari regular. Presentasi pekerjaan per 31 Desember              87.93%.
   2022 mencapai 87,93%.

   KSO Waskita Bersama Vision First                                KSO Waskita Bersama Vision First

   Perusahaan memperoleh pekerjaan Pembangunan                     The company obtained the construction of the Dukuh
   Jembatan Penyeberangan Multiguna Dukuh Atas dan                 Atas Multipurpose Crossing Bridge and Sudirman
   Revitalisasi Stasiun Sudirman sesuai dengan kontrak             Station Revitalization in accordance with contract No.

                                                            70
Page 74
                                                                         The original financial statements included herein are in
                                                                                                       the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                        NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022              JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                           30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                              ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                             (UNAUDITED)

   No. 001/SPK/KSO.WBF/X/2021 tanggal 18 Oktober               001/SPK/KSO.WBF/X/2021 dated October 18, 2021,
   2021, pemilik proyek KSO Waskita Bersama Vision             the owner of the Waskita Bersama Vision First KSO
   First,   dengan      nilai   Kontrak   sebesar              project, with a contract value of Rp183,827,896,345
   Rp183.827.896.345,- (termasuk PPN).                         (including VAT).

   Pada tanggal 20 Desember 2021 adanya Surat                  On December 20, 2021, there was a Work
   Perintah Pemborongan Pekerjaan (SPPP) atas                  Contracting Order (SPPP) for the construction of the
   pekerjaan Pembangunan Jembatan Penyebrangan                 Dukuh Atas Multipurpose Crossing Bridge and
   Multiguna Dukuh Atas dan Revitalisasi Stasiun               Sudirman Station Revitalization until May 30, 2022.
   Sudirman sampai dengan 30 Mei 2022

   Pada tanggal 13 April 2022 adanya Amandemen                 On April 13, 2022, there was a contract amendment
   kontrak atas perpanjangan waktu pelaksanaan                 for extending the implementation time for the
   Pembangunan Jembatan Penyeberangan Multiguna                construction of the Dukuh Atas Multipurpose Crossing
   Dukuh Atas dan Revitalisasi Stasiun Sudirman dari           Bridge and Sudirman Station Revitalization from June
   30 Juni 2022 sampai dengan 31 Desember 2022 dan             30, 2022 to December 31, 2022 and changes in the
   perubahan tarif PPN dari 10% menjadi 11% dengan             VAT rate from 10% to 11% with a contract value of
   nilai   Kontrak   sebesar    Rp185.452.939.075,-            Rp185,452,939,075, - (Including VAT) according to
   (Termasuk PPN) sesuai Kontrak Amandemen I                   Contract Amendment I with Contract Number
   dengan Nomor Kontrak 001/AMD/SPPP/KSO.                      001/AMD/SPPP/KSO.WBF/2022.
   WBF/2022.

   Pada tanggal 22 Desember 2022 adanya                        On December 22, 2022, there was a contract
   Amandemen kontrak atas perpanjangan waktu                   amendment for the extension of time for the
   pelaksanaan         Pembangunan       Jembatan              construction of the Dukuh Atas Multipurpose Crossing
   Penyeberangan Multiguna Dukuh Atas dan                      Bridge and Sudirman Station Revitalization from
   Revitalisasi Stasiun Sudirman dari 31 Desember              December 31, 2022 to July 31, 2023 according to the
   2022 sampai dengan 31 Juli 2023 sesuai Kontrak              Contract Amendment II with Contract Number
   Amandemen        II  dengan    Nomor    Kontrak             002/AMD/SPPP/KSO.WBVF/2022.
   002/AMD/SPPP/KSO.WBVF/2022.

   Pada tanggal 24 Mei 2023 adanya Amandemen                   On May 24, 2023 there was an amendment to the
   kontrak atas perubahan nilai kontrak dan                    contract for changes in the value of the contract and
   penyesuaian item pekerjaan pelaksanaan Pekerjaan            adjustments to work items for the implementation of
   Pembangunan Jembatan Penyeberangan Multiguna                the Dukuh Atas Multipurpose Crossing Bridge
   Dukuh Atas dengan nilai kontrak sebesar                     Development Work with a contract value of
   Rp74.000.000.000 (Tidak termasuk PPN) sesuai                Rp74,000,000,000 (Excluding VAT) according to
   dengan Kontrak Amandemen III dengan Nomor                   Contract Amendment III with Contract Number
   Kontrak 001/AMD/SPPP/KSO.WBVF/2023                          001/AMD/SPPP/KSO.WBVF/2023.

   Konfirmasi Fisik pekerjaan pembangunan Jembatan             Physical Confirmation of the work on the construction
   Penyeberangan Multiguna Dukuh Atas per 30 Juni              of the Dukuh Atas Multipurpose Crossing Bridge as of
   2023 sebesar 83,47% atau Rp61.770.151.487.                  June 30, 2023 of 83.47% or Rp61,770,151,487.

   Tagihan termin dari bulan November 2021 hingga              Term bills from November 2021 to May 2023 are
   bulan   Mei    2023     sebesar 46,41%    atau              46.41% or Rp34,344,383,471.
   Rp34.344.383.471


   PT Kapuk Naga Indah                                         PT Kapuk Naga Indah

   Perusahaan    memperoleh      kontrak    pekerjaan          The company obtained the PIK Island 2B Pumping
   Konstruksi Rumah Pompa (Pumping Station) Pulau              Station Construction work contract, Work Order No.
   2B     PIK,    Surat    Perintah      Kerja    No.          KNI/PO/06/21/00031 dated June 15, 2021, with a
   KNI/PO/06/21/00031 tanggal 15 Juni 2021, dengan             contract value of Rp50,700,000,000 excluding VAT.
   nilai kontrak Rp50.700.000.000 belum termasuk               The work period is June 15, 2021 to June 14, 2022,
   PPN. Jangka waktu pekerjaan 15 Juni 2021 sampai             the payment mechanism is a monthly progress
   dengan 14 Juni 2022, , mekanisme pembayaran                 system as evidenced by the Monthly Physical Work
   adalah sistem progres bulanan yang dibuktikan               Progress Report.
   dengan Laporan Progres Fisik Pekerjaan Bulanan.



                                                        71
Page 75
                                                                            The original financial statements included herein are in
                                                                                                          the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                   PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                           NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                 JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                              30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                 ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                (UNAUDITED)

   Berdasarkan Addendum Surat Perintah Kerja No:                  Based on the Addendum to Work Order No: Add 1-
   Add 1-KNI/PO/06/21/00031, dengan perpanjangan                  KNI/PO/06/21/00031, with an extension of the Work
   waktu Pelaksanaan Pekerjaan 15 Juni 2021 sampai                Implementation period from June 15, 2021 to August
   dengan 14 Agustus 2022. Progres Pekerjaan hingga               14, 2022. Work progress until June 30, 2023 and
   30 Juni 2023 dan 31 Desember 2022 progresnya                   December 31, 2022 has reached 100% and 100 %.
   mencapai 100% dan 100%.

   PT   Pertamina    Marine    Engineering-Proyek                 PT Pertamina Marine Engineering - Breasting
   Perbaikan Breasting Dolphin Kap 6500 DWT Jetty                 Dolphin Hood Repair Project 6500 DWT Jetty 2
   2 Integrated Terminal Pertamina Manggis                        Integrated  Terminal    Pertamina   Manggis
   Karangasem Bali                                                Karangasem Bali

   Perusahaan         memperoleh      Surat     Perintah          The company obtained an Order for the
   Pelaksanaan        Pekerjaan Mendahalui       Kontrak          Implementation of Preliminary Contract Work
   (SP3MK) pada tanggal 02 Oktober 2020 nomor                     (SP3MK) on October 2, 2020 number SPM3K-
   SPM3K-001/PKJ-C0000/2020 yang berdasarkan                      001/PKJ-C0000/2020 based on the Appointment of
   Penunjukkan Pemenang Penunjukkan Langsung                      Winners of Direct Appointment for Dolphin Kap
   Perbaikan Dolphin Kap. 6500 DWT di Dermaga 2                   Repair. 6500 DWT at Pier 2 Integrate Terminal
   Integrate Terminal Manggis nomor 149/PKJ-                      Manggis number 149/PKJ-Panitia.PBJ/2020 dated
   Panitia.PBJ/2020 tanggal 02 Oktober 2020. Adapun               October 2, 2020. The work contract between PT
   kontrak pekerjaan antara pihak PT Pertamina Marine             Pertamina Marine Engineering which was originally
   Engineering yang semula Bernama PT Peteka Karya                named PT Peteka Karya Jala and the Company came
   Jala dengan Perusahaan keluar pada tanggal 21                  out on December 21, 2022 with a principal number
   Desember 2022 dengan nomor pokok perjanjian SPJ-               SPJ-29/PKJ-C0000/2020 agreement with a work
   29/PKJ-C0000/2020 dengan nilai pekerjaan sebesar               value of Rp17,574,474,000. To start work, the
   Rp17.574.474.000. Untuk memulai pekerjaan,                     company receives an advance of 10% of the total
   perusahaan menerima uang muka sebesar 10% dari                 contract value with a maturity of 30 calendar days.
   total nilai kontrak dengan jangka waktu tempo selama           The period for carrying out the work is 365 calendar
   30 hari kalender.        Jangka waktu pelaksanaan              days starting from 02 October 2020 to October 2,
   pekerjaan adalah selama 365 hari kalender dimulai              2021, with a maintenance period of 180 calendar
   dari 02 Oktober 2020 sampai dengan 02 Oktober                  days and applies after receipt of Operational
   2021, dengan masa pemeliharaan selama 180 hari                 Acceptance as stated in the Minutes of Work
   kalender dan berlaku setelah diterimanya Operational           Completion. The company obtained a time extension
   Acceptance yang tertuang dalam Berita Acara                    addendum with Principal Agreement number SPJ-
   Penyelesaian Pekerjaan. Perusahaan memperoleh                  032/PKJ-C0000/2021 dated September 29, 2021.
   addendum perpanjangan waktu dengan nomor                       The length of time for carrying out the work is 445
   Pokok         Perjanjian     SPJ-032/PKJ-C0000/2021            calendar days from October 2, 2020 with the end of
   tertanggal 29 September 2021. Adapun lama waktu                the extension on December 21, 2021. Contract value
   pelaksanaan pekerjaan menjadi 445 hari kalender                also increased by Rp661,000,000 and changed to
   terhitung sejak tanggal 02 Oktober 2020 dengan                 Rp18,235,000,000. The company obtained an
   berakhirnya perpanjangan waktu pada tanggal 21                 extension of the work execution time in January 2023
   Desember 2021. Nilai kontrak juga mengalami                    for 441 calendar days starting from December 22
   peningkatan sebesar Rp661.000.000 dan berubah                  2021 to March 7, 2023. As of April 2023, the company
   menjadi          Rp18.235.000.000.        Perusahaan           is in the process of negotiating the work
   memperoleh perpanjanganan waktu pelaksanaan                    implementation period so that it will increase by 24
   pekerjaan pada bulan Januari 2023 selama 441 hari              days according to the progress of the work that has
   kalender terhitung sejak tanggal 22 Desember 2021              been carried out. The payment method is based on a
   sampai dengan 07 Maret 2023. Per April 2023,                   minimum monthly progress of 2% compared to the
   perusahaan dalam proses negoisasi jangka waktu                 previous month which is stated in the Monthly
   pelaksanaan pekerjaan agar bertambah sebanyak 24               Certificate which is issued at the end of each month
   hari menyesuaikan progress pekerjaan yang sudah                and has been agreed between PT Pertamina Marine
   dilaksankan.        Metode     pembayaran      adalah          Engineering and the Company. Progress until June
   berdasarkan progress bulanan yang minimal sebesar              30, 2023 reached 99.62%
   2% dibanding bulan sebelumnya yang dituangkan
   dalam Monthly Certificate yang diterbitkan setiap
   akhir bulan dan telah disetujui antara PT Pertamina
   Marine Engineering dengan Perusahaan. Progress
   sampai dengan 30 Juni 2023 mencapai 99,62%




                                                           72
Page 76
                                                                             The original financial statements included herein are in
                                                                                                           the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                    PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                            NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                  JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                               30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                  ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                 (UNAUDITED)

   PT Waskita Karya (Persero) Tbk Divisi                           PT Waskta Karya (Persero) Tbk Infrastructure
   Infrastruktur II - Proyek Peningkatan Jalan                     Division II - Siligita-Kempinski Showcase
   Simpang Siligita-Kempinski Showcase Mangrove                    Mangrove Showcase Road Improvement Project
   Denpasar Bali                                                   Denpasar Bali

   Perusahaan memperoleh Surat Perintah Mulai Kerja                The company obtained a Start Work Order (SPMK)
   (SPMK)       No.      11/SPMK/WK/SCM/WAH/2022                   No. 11/SPMK/WK/SCM/WAH/2022 dated February
   tertanggal 17 Februari 2022. Adapun perusahaan                  17, 2022. The company is asked to start carrying out
   diminta     memulai     melaksanakan       pekerjaan            work based on the work contract Letter of Contract for
   berdasarkan kontrak kerja Surat Perjanjian                      Work         Agreement        (SPPP)         number
   Pemborongan         Pekerjaan      (SPPP)      nomor            11/SPPP/WK/SCM/WAH/2022 dated February 17,
   11/SPPP/WK/SCM/WAH/2022 tanggal 17 Februari                     2022 with an implementation period of 65 calendar
   2022 dengan jangka waktu pelaksanaan selama 65                  days until April 23, 2022 with a total work value of
   hari kalender sampai dengan tanggal 23 April 2022               Rp19,194,125,000. The Company obtains a down
   dengan total nilai pekerjaan Rp19.194.125.000.                  payment of 20% of the total contract value with a
   Perusahaan memperoleh uang muka sebesar 20%                     payment term of 60 calendar days. The company
   dari total nilai kontrak dengan jangka waktu                    obtained an addendum for changes in Value Added
   pembayaran atas termin selama 60 hari kalender.                 Tax       with      number      SPPP        11/ADD-
   Perusahaan memperoleh addendum perubahan nilai                  1/SPPP/WK/SCM/WAH/2022 dated 8 April 2022.
   Pajak Pertambahan Nilai dengan nomor SPPP                       Apart from changes in VAT values, the period for
   11/ADD-1/SPPP/WK/SCM/WAH/2022 tertanggal 8                      carrying out work was extended to 163 calendar days
   April 2022. Selain perubahan nilai PPN, jangka waktu            and ended on July 30, 2022. The contract value has
   pelaksanaan pekerjaan diperpanjang menjadi 163                  changed to Rp15,022,750,000 through the second
   hari kalender dan berakhir pada tanggal 30 Juli 2022.           addendum dated June 16, 2022 with addendum No.
   Nilai kontrak mengalami perubahaan menjadi                      11/ADD-II/SPPP/WK/SCM/WAH/2022. Currently the
   Rp15.022.750.000 melalui addendum kedua yang                    company is in the process of negotiating a third
   tertanggal 16 Juni 2022 dengan addendum No.                     addendum to obtain the final term for the remaining
   11/ADD-II/SPPP/WK/SCM/WAH/2022.            Saat    ini          work value that the company has fulfilled. Progress
   Perusahaan sedang proses negoisasi addendum                     until June 30, 2023 reached 89.98%.
   ketiga untuk memperoleh termin terakhir atas sisa
   nilai pekerjaan yang telah perusahaan penuhi.
   Progress sampai dengan 30 Juni 2023 mencapai
   89,98%.

   PT Waskita Agung-KSO – Proyek Pemancangan                       PT Waskita Agung-KSO – CCSP & Spun pile Piling
   CCSP & Spunpile Sungai Loji Banger Pekalongan                   Project Loji Banger Pekalongan River

   Perusahaan memperoleh kontrak pekerjaan untuk                   The company obtained a work contract for the Loji
   Proyek Pemancangan CCSP Sungai Loji Banger                      Banger Pekalongan River CCSP Piling Project No.
   Pekalongan No. 36.5/SPPP/WK/SCM/WAG/2022                        36.5/SPPP/WK/SCM/WAG/2022 on February 7,
   pada tanggal 7 Februari 2022 dengan nilai kontrak               2022 with a contract value of Rp184,050,000. This
   sebesar Rp184.050.000. Kontrak ini telah beberapa               contract has been amended several times. Based on
   kali mengalami perubahan. Berdasarkan pada                      the      latest     contract    addendum,         No.
   addendum           kontrak      terakhir,     No.               36.5/ADD.2/SPPP/WK/SCM/WAG/2022 dated July
   36.5/ADD.2/SPPP/WK/SCM/WAG/2022 tanggal 25                      25, 2022 The contract value which was originally
   Juli 2022 Nilai Kontrak yang semula sebesar                     Rp184,050,000 changed to Rp3,587,010,000, with a
   Rp184.050.000 berubah menjadi Rp3.587.010.000,                  period for carrying out the work to November 30,
   dengan jangka waktu pelaksanaan pekerjaan                       2022. The payment method used in This work
   menjadi 30 November 2022. Metode pembayaran                     contract is by term method. The progress of this work
   yang digunakan pada kontrak pekerjaan ini adalah                project as of December 31, 2022 reached 100%.
   dengan metode termin. Progres dari proyek
   pekerjaan ini per 31 Desember 2022 mencapai 100%.

   PT Waskita Agung-KSO – Proyek Pengadaan                         PT Waskita Agung-KSO – CCSP & Spun pile
   CCSP & Spunpile Sungai Loji Banger Pekalongan                   Procurement  Project Loji Banger  River
                                                                   Pekalongan

   Perusahaan memperoleh kontrak pekerjaan untuk                   The company obtained a work contract for the Sungai
   Proyek Pengendalian Banjir dan Rob Sungai Loji                  Loji Flood Control and Robust Project with the CCSP
   dengan pekerjaan pengadaan CCSP dan Spun Pile.                  and Spun Pile procurement work. For the CCSP
   Untuk Pekerjaan pengadaan CCSP sendiri dengan                   procurement work itself with contract number
   kontrak nomor 211/SPPM/WK/SCM/WAG/2021,                         211/SPPM/WK/SCM/WAG/2021, on December 31,
   pada tanggal 31 Desember 2021 dengan nilai kontrak              2021 with a contract value of Rp44,754,333,750
   Rp44.754.333.750 (exclude. PPN 11%) dan                         (excluding. VAT 11%) and addendum I with number:
                                                            73
Page 77
                                                                                                                         The original financial statements included herein are in
                                                                                                                                                       the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                                                    PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                                                            NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                                                  JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                                               30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                                                  ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                                                 (UNAUDITED)

   diadendum     I    dengan    nomor:   211/ADD-                                                      211/ADD- I/SPPM/WK/SCM/WAG/2022 dated April
   I/SPPM/WK/SCM/WAG/2022 tangggal 18 April 2022                                                       18, 2022 The implementation period starts from
   Jangka waktu pelaksanaan mulai tanggal 31                                                           December 31, 2021 to September 29, 2022. As for
   Desember 2021 sampai dengan 29 September 2022.                                                      the Spun Pile procurement work with contract No.
   Sedangkan untuk pekerjaan pengadaan Spun Pile                                                       177.4/SPPM/WK/SCM/WAG/2022 on June 13, 2022,
   dengan kontrak No. 177.4/SPPM/WK/SCM/WAG/                                                           the contract value is Rp1,688,880,000 (excluding
   2022 pada tanggal 13 Juni 2022 nilai kontraknya                                                     11% VAT). For the progress of the CCSP and Spun
   Rp1.688.880.000 (exclude PPN 11%). Untuk                                                            Pile procurement work until December 31, 2022, it is
   progress Pekerjaan pengadaan CCSP dan Spun Pile                                                     100%.
   sampai dengan 31 Desember 2022 sebesar 100%.


10. PAJAK DIBAYAR DIMUKA                                                                        10. PREPAID TAXES

                                                                     30 Juni/              31 Desember/                  30 Juni/
                                                                     June 30               December 31,                  June 30
                                                                      2023                     2022                       2022
                                                                       Rp                       Rp                         Rp

   Pajak Pertambahan Nilai                                          90.986.231.232              77.920.371.383           31.441.803.836                                            Value Added Tax
   Pajak Penghasilan Pasal 22                                        1.419.334.452                           --                       --                                       Income Tax Article 22
   Pajak Penghasilan Pasal 28A                                                   --                361.552.777                        --                                     Income Tax Article 28A

   Jumlah                                                           92.405.565.684              78.281.924.160           31.441.803.836                                                            Total



11. BIAYA DIBAYAR DIMUKA                                                                        11. PREPAID EXPENSES

                                                                       30 Juni/             31 Desember/                  30 Juni/
                                                                       June 30,             December 31,                  June 30,
                                                                         2023                   2022                        2022
                                                                          Rp                     Rp                          Rp

   Mobilisasi dan operasi                                            30.167.973.145              16.793.183.852           19.102.943.817                              Mobilization and operation
   Premi asuransi                                                     2.108.328.060               1.385.934.002              968.254.232                                        Insurance premium
   Jumlah                                                            32.276.301.205              18.179.117.854           20.071.198.049                                                          Total


   Mobilisasi dan operasi merupakan beban yang telah                                              `    Mobilization and operation represent expenses
   dikeluarkan oleh Perusahaan untuk mobilisasi atas                                                   incurred by the Company for mobilization for build
   pembukaan plant dan diamortisasi selama 1-2 tahun.                                                  new plant and amortization for 1-2 years.


12. ASET TETAP                                                                                  12. PROPERTY, PLANT AND EQUIPMENT
                                                                                    30 Juni/June 30 , 2023
                                                                             Pengurangan
                                                                               (Koreksi)/
                                      Saldo Awal/        Penambahan/          Deductions            Revaluasi/          Reklasifikasi/              Saldo Akhir
                                   Beginning Balance      Additions          (Correction)         Revaluation          Reclasification            Ending Balance
                                          Rp                 Rp                   Rp                    Rp                   Rp                         Rp

   Kepemilikan Langsung                                                                                                                                                           Acquisition Cost
      Tanah                          1.522.918.562.314       404.000.000                   --                     --                     -        1.523.322.562.314                         Land
      Gedung dan Pabrik              1.446.893.920.054       740.450.000                   --                     --                     -        1.447.634.370.054           Buildings and Plant
      Perlengkapan Kantor               30.413.970.242                 --                  --                     --                     -           30.413.970.242            Office Equipment
      Peralatan                      3.006.300.958.855                 --                  --                     --                     -        3.006.300.958.855                   Equipment
      Kendaraan                            432.563.780                 --                  --                     --                     -              432.563.780                      Vehicles
       Jumlah                        6.006.959.975.245     1.144.450.000                   --                     --                         --   6.008.104.425.245                           Total

   Aset Tetap Dalam Penyelesaian                                                                                                                                          Construction in Progress
      Gedung dan Pabrik                14.128.279.438                   --                 --                     --                         --      14.128.279.438          Buildings and Plant
      Peralatan                       158.071.889.251                   --                 --                     --                     -          158.071.889.251                   Equipment
       Jumlah                         172.200.168.689                   --                 --                     --                         --     172.200.168.689                           Total

   Akumulasi Penyusutan :                                                                                                                                                Accumulated Depreciation
      Gedung dan Pabrik                341.928.030.942    35.434.019.460                   --                     --                     -          377.362.050.402          Buildings and Plant
      Perlengkapan Kantor               28.971.196.233       360.693.500                   --                     --                     -           29.331.889.733            Office Equipment
      Peralatan                      2.069.973.547.071   139.731.078.154                   --                     --                     -        2.209.704.625.225                   Equipment
      Kendaraan                            350.211.226        10.294.069                   --                     --                         --         360.505.295                     Vehicles
       Jumlah                        2.441.222.985.472   175.536.085.183                   --                     --                         --   2.616.759.070.655                           Total

   Akumulasi Penurunan Nilai                                                                                                                                                 Accumulated Impairment
   Kepemilikan Langsung                                                                                                                                                             Acquisition Cost
       Gedung dan Pabrik                6.962.153.326                   --                 --                     --                         --       6.962.153.326              Building and Plant
       Peralatan                                           36.302.178.368                                                                            36.302.178.368                     Equipment
   Aset Tetap Dalam Penyelesaian                                                                                                                                            Construction in Progress
       Gedung dan Pabrik               14.128.279.438                   --                                        --                         --      14.128.279.438               Building and Plant
       Peralatan                       35.945.169.305                   --                 --                     --                         --      35.945.169.305                       Equipment

       Jumlah                          57.035.602.069     36.302.178.368                   --                     --                         --      93.337.780.437

   Nilai Tercatat                    3.680.901.556.393                                                                                            3.470.207.742.842              Net Carrying Value



                                                                                    74
Page 78
                                                                                                                               The original financial statements included herein are in
                                                                                                                                                             the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                                                          PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                                                                  NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                                                        JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                                                     30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                                                        ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                                                       (UNAUDITED)


                                                                                  31 Desember/December 31 , 2022
                                                                                Pengurangan
                                                                                  (Koreksi)/
                                      Saldo Awal/           Penambahan/          Deductions         Penilaian/                Reklasifikasi/          Saldo Akhir
                                   Beginning Balance         Additions           (Correction)      Revaluation               Reclasification        Ending Balance
                                          Rp                    Rp                    Rp               Rp                          Rp                     Rp

   Kepemilikan Langsung                                                                                                                                                             Acquisition Cost
      Tanah                            1.010.105.709.999                  --                 --                    --          512.812.852.315        1.522.918.562.314                      Land
      Gedung dan Pabrik                  785.675.741.718                  --                 --                    --          661.218.178.336        1.446.893.920.054        Buildings and Plant
      Perlengkapan Kantor                 26.309.825.354      1.597.600.000                  --                    --            2.506.544.888           30.413.970.242         Office Equipment
      Peralatan                        2.259.228.796.608                  --                 --                    --          747.072.162.247        3.006.300.958.855                Equipment
      Kendaraan                              432.563.780                  --                 --                    --                        --             432.563.780                   Vehicles
      Jumlah                           4.081.752.637.459      1.597.600.000                  --                    --         1.923.609.737.786       6.006.959.975.245                       Total

   Aset Tetap Dalam Penyelesaian                                                                                                                                            Construction in Progress
      Gedung dan Pabrik                  25.580.174.412                    --    11.451.894.974                    --                        --          14.128.279.438        Buildings and Plant
      Peralatan                          17.516.262.205                    --     5.345.578.095                    --          145.901.205.141          158.071.889.251                Equipment
      Jumlah                             43.096.436.617                    --    16.797.473.069                    --          145.901.205.141          172.200.168.689                       Total

   Akumulasi Penyusutan                                                                                                                                                    Accumulated Depreciation
      Gedung dan Pabrik                  153.185.036.725     58.528.059.834                  --                    --          130.214.934.383          341.928.030.942        Buildings and Plant
      Perlengkapan Kantor                 25.858.950.451        605.700.897                  --                    --            2.506.544.885           28.971.196.233         Office Equipment
      Peralatan                        1.370.634.306.824    281.514.043.782                  --                    --          417.825.196.465        2.069.973.547.071                Equipment
      Kendaraan                              322.761.375         27.449.851                  --                    --                        --             350.211.226                   Vehicles
      Jumlah                           1.550.001.055.375    340.675.254.364                  --                    --          550.546.675.733        2.441.222.985.472                       Total
   Akumulasi Penurunan Nilai                                                                                                                                                  Accumulated Impairment
   Kepemilikan Langsung                                                                                                                                                               Acquisition Cost
      Gedung dan Pabrik                                --      6.962.153.326                 --                    --                          --         6.962.153.326           Building and Plant
   Aset Tetap Dalam Penyelesaian                                                                                                                                               Construction in Progress
      Gedung dan Pabrik                                --     14.128.279.438                 --                    --                          --        14.128.279.438           Building and Plant
      Peralatan                                        --     35.945.169.305                 --                    --                          --        35.945.169.305                   Equipment

      Jumlah                                           --     57.035.602.069                 --                    --                          --         57.035.602.069                          Total

   Nilai Tercatat                      2.574.848.018.701                                                                                              3.680.901.556.393           Net Carrying Value


                                                                                        30 Juni/June 30 , 2022
                                                                                 Pengurangan
                                                                                   (Koreksi)/
                                      Saldo Awal/           Penambahan/           Deductions            Revaluasi/              Reklasifikasi/         Saldo Akhir
                                   Beginning Balance         Additions           (Correction)         Revaluation              Reclasification       Ending Balance
                                          Rp                    Rp                    Rp                    Rp                       Rp                    Rp

   Kepemilikan Langsung                                                                                                                                                             Acquisition Cost
      Tanah                          1.010.105.709.999                    --                      --                    --       512.812.852.315     1.522.918.562.314                        Land
      Gedung dan Pabrik                785.675.741.718                    --                      --                    --       661.218.178.336     1.446.893.920.054          Buildings and Plant
      Perlengkapan Kantor               26.309.825.354           21.899.996                       --                    --         2.506.544.882        28.838.270.232           Office Equipment
      Peralatan                      2.259.228.796.608                    --                      --                    --       747.072.162.084     3.006.300.958.692                  Equipment
      Kendaraan                            432.563.780                    --                      --                    --                     --          432.563.780                     Vehicles
       Jumlah                        4.081.752.637.459           21.899.996                       --                    --      1.923.609.737.617    6.005.384.275.072                          Total

   Aset Tetap Dalam Penyelesaian                                                                                                                                            Construction in Progress
      Gedung dan Pabrik                 25.580.174.412                    --                      --                    --                     --       25.580.174.412         Buildings and Plant
      Peralatan                         17.516.262.205          798.800.000                       --                    --       145.901.205.226       164.216.267.431                  Equipment
       Jumlah                           43.096.436.617          798.800.000                       --                    --       145.901.205.226       189.796.441.843                          Total

   Akumulasi Penyusutan :                                                                                                                                                  Accumulated Depreciation
      Gedung dan Pabrik                153.185.036.725       18.636.622.729                       --                    --       130.214.934.383       302.036.593.837         Buildings and Plant
      Perlengkapan Kantor               25.858.950.451          284.626.387                       --                    --         2.506.544.888        28.650.121.726           Office Equipment
      Peralatan                      1.370.634.306.824      120.386.206.159                       --                    --       417.825.196.465     1.908.845.709.448                  Equipment
      Kendaraan                            322.760.375           13.725.425                       --                    --                     --          336.485.800                    Vehicles
       Jumlah                        1.550.001.054.375      139.321.180.700                       --                    --       550.546.675.736     2.239.868.910.811                          Total

   Nilai Tercatat                    2.574.848.019.701                                                                                               3.955.311.806.104            Net Carrying Value

                                                                                       75
Page 79
                                                                                                                                         The original financial statements included herein are in
                                                                                                                                                                       the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                                                                    PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                                                                            NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                                                                  JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                                                               30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                                                                  ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                                                                 (UNAUDITED)

   Beban penyusutan dialokasikan sebagai berikut:                                                                                Depreciation expenses was allocated as follows:

                                                                                     30 Juni/                                 30 Juni/
                                                                                     June 30                                  June 30
                                                                                      2023                                     2022
                                                                                       Rp                                       Rp
   Beban Non-Contributing Plants                                                  119.828.903.995                        120.108.706.155                      Non-Contributing Plant Expense
   Beban Umum dan Administrasi (Catatan 29)                                        35.805.007.029                          1.147.275.227        General and Administrative Expenses (Note 29)
   Beban Pokok Pendapatan                                                          19.902.174.159                         18.065.199.318                                    Cost of Revenues
   Jumlah Beban Penyusutan                                                        175.536.085.183                        139.321.180.700                       Total Depreciation Ecpenses

   Pada periode berjalan, Perusahaan melakukan reviu                                                                         During the period, the Company carried out a review
   atas jumlah terpulihkan aset tetap dalam                                                                                  of the recoverable amount of its construction in
   penyelesaian. Reviu menunjukkan pengakuan                                                                                 progress. The review led to the recognition of an
   kerugian penurunan nilai sebesar Rp36.302.178.368                                                                         impairment loss of Rp36,302,178,368 that has been
   yang telah diakui di laba rugi dan disertakan dalam                                                                       recognized in profit or loss and included in “general
   “beban umum dan administrasi” (Catatan 29).                                                                               and administrative expenses” (Note 29).

   Perusahaan telah memperoleh beberapa hak atas                                                                             The Company has obtained land rights title or building
   tanah atau Hak Guna Bangunan (HGB) seluas 24                                                                              use rights covering an area of 24 hectares in
   hektar di Bojonegara, Cibitung, Kalijati, Sadang dan                                                                      Bojonegara, Cibitung, Kalijati, Sadang and Subang
   Subang selama 35 tahun hingga 2046 dari Badan                                                                             for 35 years until 2046 from the National Land Affairs
   Pertanahan Nasional, yang terdiri dari seluas 6,16                                                                        Agency (Badan Pertanahan Nasional), which consist
   hektar di Bojonegara; 1,66 hektar di Cibitung; 1,19                                                                       of over 6.16 hectares in Bojonegara; 1.66 hectares in
   hektar di Kalijati; 7,01 hektar di Sadang; dan 15,09                                                                      Cibitung; 1.19 hectares in Kalijati; 7.01 hectares in
   hektar di Subang.                                                                                                         Sadang; and 15.09 hectares in Subang.

   Manajemen berpendapat bahwa tidak akan ada                                                                                Management believes that there will be no difficulty in
   kesulitan dalam proses perpanjangan hak atas tanah                                                                        obtaining extension of land rights since all land were
   karena semua tanah diperoleh secara legal dan                                                                             acquired legally and supported by sufficient evidence
   didukung oleh dokumen kepemilikan yang memadai.                                                                           of ownership.

   Pada         tanggal     30         Juni    2023,                                                                         As of June 30, 2023, December 31, 2022 and June
   31 Desember 2022 dan 30 Juni 2022, aset gedung                                                                            30, 2022, buildings and plant, and equipment of
   dan pabrik, serta peralatan diasuransikan dengan                                                                          precast plant were insured with details is as follows:
   nilai pertanggungan sebagai berikut:

                           Nama Asurandur/                                                      Jenis Aset/                                Periode Asuransi/                                Nilai Pertanggungan/
                                 Insurer                                                     Type of Assets                                Insurance Period                                  The Sum Insured
                                                                                                                                                                                                    Rp
   30 Juni/June 30, 2023
   Asuransi Central Asia (ACA)                                 Contractor's All Risk And Third Party Liability Insurance                      30 Januari 2023 s.d           30 Juni 2023       2.525.965.112.965
   Asuransi Jasindo                                            Contractor's All Risk Including Third Party Legal Liability                  09 Desember 2016 s.d       09 Desember 2023        4.274.484.619.000
   PT Asuransi Purna Artha Nugraha (ASPAN) General Insurance   Contractor's All Risk                                                              30 Mei 2022 s.d           11 April 2023        75.793.497.302
                                                               TOTAL                                                                                                                           6.876.243.229.267


   31 Desember/December 31, 2022
   KSK Insurance                                               Contractor's All Risk                                                               6-Jan-2022    s.d        30-Sep-2022            5.247.288.200
   Asuransi Central Asia (ACA)                                 Contractor's All Risk                                                              21-Dec-2020    s.d         30-Jan-2023       2.442.660.241.478
   Asuransi Jasindo                                            Property All Risk                                                               18 Januari 2022   s.d      18 Januari 2023         96.379.000.000
   Asuransi Jasindo                                            Earthquake Insurance Policy                                                     18 Januari 2022   s.d      18 Januari 2023         96.379.000.000
   Asuransi Jasindo                                            Property All Risk                                                               18 Januari 2022   s.d      18 Januari 2023         86.743.000.000
   Asuransi Jasindo                                            Earthquake Insurance Policy                                                     18 Januari 2022   s.d      18 Januari 2023         86.743.000.000
   Asuransi Jasindo                                            Property All Risk                                                                04 Maret 2022    s.d       04 Maret 2023         173.860.000.000
   Asuransi Jasindo                                            Asuransi Gempa Bumi Indonesia                                                    04 Maret 2022    s.d       04 Maret 2023         173.860.000.000
   Asuransi Jasindo                                            Property All Risk Policy                                                            1-Feb-2022    s.d          1-Feb-2023         220.026.000.000
   Asuransi Jasindo                                            Earthquake Insurance Policy                                                         1-Feb-2022    s.d          1-Feb-2023         220.026.000.000
   Asuransi Jasindo                                            Property All Risk Policy                                                            1-Feb-2022    s.d          1-Feb-2023          60.921.000.000
   Asuransi Jasindo                                            Earthquake Insurance Policy                                                         1-Feb-2022    s.d          1-Feb-2023          60.921.000.000
   Asuransi Jasindo                                            Property All Risk Policy                                                            1-Feb-2022    s.d          1-Feb-2023          88.105.000.000
   Asuransi Jasindo                                            Earthquake Insurance Policy                                                         1-Feb-2022    s.d          1-Feb-2023          88.105.000.000
   Aspan General Insurance                                     Contractor's All Risk Insurance Including Third Party Legal Liability              30-May-2022    s.d         11-Apr-2023          75.793.497.302
   PT Asuransi Purna Artha Nugraha (ASPAN) General Insurance   Contractor's All Risk                                                              18-Oct-2021    s.d         11-Apr-2023          91.322.772.103
                                                               TOTAL                                                                                                                           4.067.091.799.083



                                                                                                  76
Page 80
                                                                                                                                       The original financial statements included herein are in
                                                                                                                                                                     the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                                                               PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                                                                       NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                                                             JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                                                          30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                                                             ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                                                            (UNAUDITED)

   30 Juni/June 30, 2022
   Asuransi Central Asia (ACA)                                 Contractor's All Risk                                                          21-Dec-2020     s.d      30-Jan-2023    2.442.660.241.478
   Asuransi Jasindo                                            Property All Risk                                                            18 Januari 2022   s.d   18 Januari 2023     96.379.000.000
   Asuransi Jasindo                                            Earthquake Insurance Policy                                                  18 Januari 2022   s.d   18 Januari 2023     96.379.000.000
   Asuransi Jasindo                                            Property All Risk                                                            18 Januari 2022   s.d   18 Januari 2023     86.743.000.000
   Asuransi Jasindo                                            Earthquake Insurance Policy                                                  18 Januari 2022   s.d   18 Januari 2023     86.743.000.000
   Asuransi Jasindo                                            Property All Risk                                                             04 Maret 2022    s.d    04 Maret 2023     173.860.000.000
   Asuransi Jasindo                                            Asuransi Gempa Bumi Indonesia                                                 04 Maret 2022    s.d    04 Maret 2023     173.860.000.000
   Asuransi Jasindo                                            Property All Risk Policy                                                         1-Feb-2022    s.d       1-Feb-2023     220.026.000.000
   Asuransi Jasindo                                            Earthquake Insurance Policy                                                      1-Feb-2022    s.d       1-Feb-2023     220.026.000.000
   Asuransi Jasindo                                            Property All Risk Policy                                                         1-Feb-2022    s.d       1-Feb-2023      60.921.000.000
   Asuransi Jasindo                                            Earthquake Insurance Policy                                                      1-Feb-2022    s.d       1-Feb-2023      60.921.000.000
   Asuransi Jasindo                                            Property All Risk Policy                                                         1-Feb-2022    s.d       1-Feb-2023      88.105.000.000
   Asuransi Jasindo                                            Earthquake Insurance Policy                                                      1-Feb-2022    s.d       1-Feb-2023      88.105.000.000
   Aspan General Insurance                                     Contractor's All Risk Insurance Including Third Party Legal Liability          30-May-2022     s.d      11-Apr-2023      75.793.497.302
   PT Asuransi Purna Artha Nugraha (ASPAN) General Insurance   Contractor's All Risk                                                           18-Oct-2021    s.d      11-Apr-2023      91.322.772.103
                                                               TOTAL                                                                                                                  4.061.844.510.883



   Manajemen berpendapat bahwa nilai pertanggungan                                                                 Management believes that the insurance coverage is
   tersebut cukup untuk menutupi kemungkinan                                                                       adequate to cover possible losses on the assets
   kerugian atas aset yang dipertanggungkan.                                                                       insured.

   Perusahaan menerapkan metode revaluasian untuk                                                                  The Company applies revaluation method for land
   aset tanah dan bangunan (Catatan 3k). Pada tanggal                                                              and buildings (Note 3k). On December 31, 2021, the
   31 Desember 2021, Perusahaan melakukan                                                                          Company assessed certain land and buildings at
   penilaian terhadap tanah dan bangunan tertentu di                                                               several locations based on assets revaluation report
   beberapa lokasi berdasarkan laporan penilai                                                                     by KJPP Toto Suharto & Rekan. The fair value of land
   independent oleh KJPP Toto Suharto & Rekan. Nilai                                                               and buildings amounted to Rp375,980,715,920.
   wajar dari tanah dan bangunan adalah sebesar                                                                    Revaluation deficit amounting to Rp43,414,133,216
   Rp375.980.715.920. Defisit revaluasi sebesar                                                                    was recognized as other comprehensive income and
   Rp43.414.133.216 telah diakui sebagai pendapat                                                                  presented under other component of equity.
   komprehensif lain dan disajikan pada komponen
   ekuitas lainnya.
   Nilai wajar tanah ditentukan dengan menggunakan                                                                 The fair value of land was determined using Market
   Pendekatan Pasar sedangkan gedung ditentukan                                                                    Approach while fair value buildings was determined
   dengan menggunakan Pendekatan Pendapatan dan                                                                    using the Income Approach and Cost Approach.
   Pendekatan Biaya.

   Nilai wajar tanah dan bangunan diklasifikasikan                                                                 The fair value of land and building is classified as level
   masing-masing hirarki nilai wajar level 2 dan 3.                                                                2 and 3 within the fair value hierarchy, respectively.

   Tidak ada perpindahan antara level 1 dan 2 selama                                                               There were no transfers between levels 1 and 2
   tahun berjalan.                                                                                                 during the year.

   Jika tanah dan bangunan dan peralatan (selain tanah,                                                            Had the Group’s land, buildings and equipment (other
   bangunan dan peralatan yang diklasifikasikan                                                                    than land, buildings and equipment classified as held-
   sebagai dimiliki untuk dijual) diukur berdasarkan                                                               for-sale) been measured on historical cost basis, their
   biaya historis, nilai tercatatnya akan menjadi sebagai                                                          carrying amounts would have been as follows:
   berikut:

                                                                       30 Juni/                         31 Desember/                         30 Juni/
                                                                       June 30                          December 31,                         June 30
                                                                        2023                                2022                              2022
                                                                         Rp                                  Rp                                Rp

   Tanah                                                             512.812.852.315                      512.812.852.315                                      --                           Land
   Bangunan                                                          495.261.788.185                      531.003.243.953                                      --                        Building
   Peralatan                                                         197.027.666.519                      329.246.965.782                                      --                     Equipment
   Jumlah Harga Perolehan                                         1.205.102.307.019                     1.373.063.062.050                                      --         Total Acquisition Cost




                                                                                               77
Page 81
                                                                                                    The original financial statements included herein are in
                                                                                                                                  the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                                  PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                                          NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                                JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                             30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                                ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                               (UNAUDITED)

   Manajemen percaya bahwa nilai wajar dari aset tetap                               Management believes that the fair value of property,
   pada tanggal 30 Juni 2023 telah mendekati nilai                                   plant and equipment as of June 30, 2023
   tercatatnya.                                                                      approximates its carrying amounts.

   Pada tanggal 30 Juni 2023, 31 Desember 2022 dan                                   As of June 30, 2023, December 31, 2022 and June
   30 Juni 2022, estimasi persentase penyelesaian aset                               30, 2022, the estimated percentages of completion of
   dalam pembangunan adalah sebagai berikut:                                         the Company’s construction in progress were as
                                                                                     follows:

                                                              Persentase dalam Penyelesaian/                               Estimasi Penyelesaian/
              Nama Proyek/ Project Name                         Percentage of Completion                                   Estimated Completion


   Pembangunan Plant Bojonegoro                                             95,26%                             Akhir Desember/End of December 2022
   Pembangunan Plant Gasing                                                 99,53%                             Akhir Desember/End of December 2022
   Pembangunan Proyek Penajam                                               75,73%                             Akhir Desember/End of December 2022
   Pembangunan Plant Cikopo                                                 84,90%                             Akhir Desember/End of December 2022
   Proyek Pembangunan Dormitory Karawang                                    91,92%                             Akhir Desember/End of December 2022

   Tidak ada kemajuan atas progres diatas, karena                                    There has been no progress on the above projects
   proyek sedang dihentikan, akibat adanya pandemi.                                  since construction was halted due to the pandemic.

   Pada tanggal 30 Juni 2023, 31 Desember 2022 dan                                   As at June 30, 2023, December 31, 2022 and June
   30 Juni 2022, aset tetap termasuk aset yang telah                                 30, 2022, property, plant and equipment includes
   habis disusutkan tetapi masih digunakan dengan                                    assets with acquisition cost that are already
   harga     perolehan     masing-masing    sebesar                                  depreciated in full but are still in use amounted to
   Rp888.260.349.693,     Rp656.376.503.688     dan                                  Rp888,260,349,693,       Rp656,376,503,688,     and
   Rp420.858.080.168.                                                                Rp420,858,080,168 respectively.

   Pada tanggal 30 Juni 2023, aset tetap Perusahaan                                  As of June 30, 2023, the Company’s property, plant
   berupa   aset    tetap   dengan     nilai tercatat                                and     equipment    with    carrying value     of
   Rp443.356.502.201 dijadikan sebagai jaminan atas                                  Rp443,356,502,201, are pledged as collateral for
   utang bank jangka panjang (Catatan 15).                                           long-term bank loans (Note 15).


13. ASET HAK-GUNA - BERSIH                                                     13. RIGHT-OF-USE ASSETS – NET

                                                               30 Juni/June 30 , 2023
                                      Saldo awal/          Penambahan/       Pengurangan/              Saldo Akhir/
                                   Beginning Balance        Additions         Deductions              Ending Balance
                                          Rp                   Rp                  Rp                       Rp
   Harga Perolehan                                                                                                                        Acquisition Cost
     Tanah                                35.258.544.554                  --                   --        35.258.544.554                              Land
     Bangunan                                400.000.000                  --                   --           400.000.000                         Buildings
     Kendaraan                            27.439.778.355                  --                   --        27.439.778.355                          Vehicles
     Jumlah                               63.098.322.909                  --                   --        63.098.322.909                               Total

   Akumulasi Penyusutan :                                                                                                         Accumulated Depreciation
     Tanah                                23.420.782.461    3.345.774.607                      --        26.766.557.068                             Land
     Bangunan                                360.648.149       39.351.851                      --           400.000.000                         Buildings
     Kendaraan                            25.658.069.357    1.102.014.909                      --        26.760.084.266                         Vehicles
     Jumlah                               49.439.499.967    4.487.141.367                      --        53.926.641.334                               Total

   Nilai Tercatat                         13.658.822.942                                                   9.171.681.575                Net Carrying Value


                                                                     78
Page 82
                                                                                              The original financial statements included herein are in
                                                                                                                            the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                              PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                                      NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                            JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                         30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                            ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                           (UNAUDITED)

                                                     31 Desember/December 31 , 2022
                                   Saldo awal/       Penambahan/     Pengurangan/                Saldo Akhir/
                                Beginning Balance     Additions       Deductions                Ending Balance
                                       Rp                 Rp               Rp                         Rp
   Harga Perolehan                                                                                                                  Acquisition Cost
     Tanah                          90.888.180.498     690.540.444         (56.320.176.388)        35.258.544.554                              Land
     Bangunan                        7.611.547.554                    --    (7.211.547.554)           400.000.000                          Buildings
     Kendaraan                      27.762.080.377                    --      (322.302.022)        27.439.778.355                          Vehicles
     Jumlah                        126.261.808.429      690.540.444        (63.854.025.964)        63.098.322.909                               Total

   Akumulasi Penyusutan :                                                                                                   Accumulated Depreciation
     Tanah                          70.768.141.814    8.972.817.035        (56.320.176.388)        23.420.782.461                             Land
     Bangunan                        7.442.566.073      129.629.630         (7.211.547.554)           360.648.149                         Buildings
     Kendaraan                      23.251.878.139    2.728.493.241           (322.302.023)        25.658.069.357                         Vehicles
     Jumlah                        101.462.586.026   11.830.939.906        (63.854.025.965)        49.439.499.967                               Total

   Nilai Tercatat                   24.799.222.403                                                 13.658.822.942                 Net Carrying Value


                                                         30 Juni/June 30 , 2022
                                   Saldo awal/       Penambahan/       Pengurangan/              Saldo Akhir/
                                Beginning Balance     Additions         Deductions              Ending Balance
                                       Rp                Rp                  Rp                       Rp
   Harga Perolehan                                                                                                                  Acquisition Cost
     Tanah                          90.888.180.498                    --    53.347.954.165         37.540.226.333                              Land
     Bangunan                        7.611.547.554                    --     7.155.991.999            455.555.555                         Buildings
     Kendaraan                      27.762.080.377                    --                 --        27.762.080.377                          Vehicles
     Jumlah                        126.261.808.429                    --    60.503.946.164         65.757.862.265                               Total

   Akumulasi Penyusutan :                                                                                                   Accumulated Depreciation
     Tanah                          70.768.141.814                --        48.273.711.618         22.494.430.196                             Land
     Bangunan                        7.442.566.073                --         7.073.584.592            368.981.481                         Buildings
     Kendaraan                      23.251.878.139    2.144.591.130                      --        25.396.469.269                         Vehicles
     Jumlah                        101.462.586.026    2.144.591.130         55.347.296.210         48.259.880.946                               Total

   Nilai Tercatat                   24.799.222.403                                                 17.497.981.319                 Net Carrying Value


   Perusahaan menyewa beberapa aset termasuk                                   The Company leases several assets including land,
   tanah, bangunan dan kendaran. Masa sewa rata-rata                           buildings, and vehicles. The average lease term is
   adalah 2 - 5 tahun.                                                         2 - 5 years.

   Liabilitas sewa Perusahaan ini dijamin dengan aset                          The Company’s lease liabilities are secured by the
   sewa yang bersangkutan.                                                     lessors’ leased assets.

   Selama tahun yang berakhir pada tanggal                                     During the year ended June 30, 2023, certain leases
   30 Juni 2023, sewa aset tetap tertentu telah berakhir                       for plant and equipment expired and no expired
   dan tidak ada kontrak yang telah berakhir diganti                           contracts were replaced.
   dengan sewa baru.

   Beban amortisasi dialokasikan sebagai berikut:                              Amortization expenses was allocated as follows:

                                                      30 Juni/                30 Juni/
                                                      June 30,                June 30,
                                                        2023                    2022
                                                         Rp                      Rp

   Beban Pokok Pendapatan                                          --                      --                                    Cost of Revenues
   Beban Umum dan Administrasi (Catatan 29)            4.487.141.367           5.280.786.237         General and Administrative Expenses (Note 29)
   Jumlah Beban Amortisasi                            4.487.141.367           5.280.786.237                               Total Amortization Cost


   Jumlah yang diakui ke laba rugi yang timbul dari sewa                       Amounts recognized in profit or loss arising from
   adalah sebagai berikut:                                                     leases are as follows:



                                                                 79
Page 83
                                                                                                 The original financial statements included herein are in
                                                                                                                               the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                               PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                                       NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                             JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                          30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                             ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                            (UNAUDITED)

                                                       30 Juni/                  30 Juni/
                                                       June 30,                  June 30,
                                                         2023                      2022
                                                          Rp                        Rp

   Beban penyusutan aset hak-guna                      4.487.141.367              5.280.786.237               Depreciation expense on right-of-use assets

   Beban bunga atas liabilitas sewa                    218.834.148                 871.544.174                        Interest expense on lease liabilities

   Beban yang berkaitan dengan sewa
    jangka pendek                                      5.236.571.271                  826.759.714                   Expense relating to short-term leases

   Beban yang berkaitan dengan sewa aset
    bernilai rendah                                                    --             50.466.822         Expense relating to leases of low-value assets


14. ASET LAIN-LAIN                                                          14. OTHER ASSETS

                                            30 Juni/               31 Desember/                    30 Juni/
                                            June 30,               December 31,                    June 30,
                                              2023                     2022                          2022
                                               Rp                       Rp                            Rp

   Perangkat lunak - bersih                  25.686.344.518          32.336.432.600              39.618.579.344                                   Software
     Harga Perolehan                         69.422.902.967          69.422.902.967              69.422.902.967                         Acquisition Cost
     Akumulasi Amortisasi                  (43.736.558.449)        (37.086.470.367)            (29.804.323.623)               Accumulated Amortization
     Nilai Buku                              25.686.344.518          32.336.432.600              39.618.579.344                              Software - net
   Beban Kontrak ditangguhkan                15.738.718.961           1.595.166.391                           --                         Deferred charges
   Beban pembangunan ditangguhkan             7.681.419.098              23.018.015              44.692.674.070             Deferred development charges
   Bank yang dibatasi penggunaannya           2.739.826.454             419.400.666               3.904.744.624                   Restricted cash in banks
   Aset diambil alih                            631.591.100             631.591.100                 631.591.100                          Assets foreclosed
   Jumlah                                   52.477.900.131             35.005.608.772            88.847.589.138                                          Total


   Beban pembangunan ditangguhkan merupakan                                       Deferred development charges are expenses paid by
   beban yang telah dikeluarkan oleh Perusahaan atas                              the Company for the construction of batching plant.
   pembangunan batching plant.

   Beban kontrak ditangguhkan merupakan beban yang                                Deferred development charges are expenses paid by
   terlah dikeluarkan oleh Perusahaan atas pekerjaan                              the Company for the work that has been carried out
   yang sudah dilaksanakan namun belum memiliki                                   but does not yet have a contract addendum.
   addendum kontrak.

15. UTANG BANK                                                              15. BANK LOANS

                                                   30 Juni/            31 Desember/          30 Juni/
                                                   June 30,            December 31,          June 30,
                                                     2023                  2022                2022
                                                      Rp                    Rp                 Rp*)
   Pinjaman bank jangka Pendek                                                                                                       Short-Term Bank Loans
   Pihak Ketiga                                                                                                                                 Third Parties
   PT Bank DKI                                   671.127.052.204        671.127.052.204     661.614.800.319                                      PT Bank DKI
   Jumlah Pihak Ketiga                           671.127.052.204        671.127.052.204     661.614.800.319                               Total Third Parties

   Jumlah                                        671.127.052.204        671.127.052.204     661.614.800.319                                              Total

   *) Disajikan Kembali pada Catatan 45                                                                                               *) As restated in Note 45


                                                                  80
Page 84
                                                                                                      The original financial statements included herein are in
                                                                                                                                    the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                                   PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                                           NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                                 JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                              30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                                 ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                                (UNAUDITED)

                                                   30 Juni/                31 Desember/             30 Juni/
                                                   June 30,                December 31,             June 30,
                                                     2023                      2022                   2022
                                                      Rp                        Rp                     Rp
   Pinjaman Bank Jangka Panjang                                                                                                             Long Term Bank Loans
   Pihak Berelasi (Catatan 37)                                                                                                             Related Parties (Note 37)
   Kredit Modal Kerja
   PT Bank Rakyat Indonesia (Persero) Tbk          863.227.418.096          865.933.755.661         849.173.632.753           PT Bank Rakyat Indonesia (Persero) Tbk
   PT Bank Negara Indonesia (Persero) Tbk          536.267.943.238          536.476.423.318         527.473.324.007          PT Bank Negara Indonesia (Persero) Tbk
   Bank Syariah Indonesia                                                                                                                     Bank Syariah Indonesia
     d/h PT Bank Rakyat Indonesia Syariah Tbk      698.440.760.706          503.134.616.379         494.854.616.379    formerly PT Bank Rakyat Indonesia Syariah Tbk
   PT Bank Mandiri (Persero) Tbk                   305.298.506.454                        --                      --                   PT Bank Mandiri (Persero) Tbk

   Jumlah Pihak Berelasi                         2.403.234.628.494         1.905.544.795.358      1.871.501.573.139                            Total Related Parties
   Diskonto belum diamortisasi                  (1.525.593.619.678)    (1.227.872.445.584)       (1.214.642.201.059)                        Unamortized discount
    Pihak Berelasi - Nilai tercatat bersih         877.641.008.816          677.672.349.774         656.859.372.080        Related Parties - Net carrying amount

   Pihak Ketiga                                                                                                                                      Third Parties
   PT Bank DKI                                     118.434.185.683           118.434.185.683        116.755.552.997                                   PT Bank DKI
   PT Bank Tabungan Pensiunan Nasional Tbk         614.149.511.847           614.288.093.575        603.253.092.870       PT Bank Tabungan Pensiunan Nasional Tbk
   PT Bank Permata Tbk                             459.997.319.257           452.550.981.778        443.074.968.833                          PT Bank Permata Tbk
   PT Bank CTBC Indonesia                          325.656.250.000           325.181.250.004        318.768.750.004                      PT Bank CTBC Indonesia
   PT BCA Syariah                                  111.019.443.140           109.870.823.344        107.845.823.344                               PT BCA Syariah
   PT Bank ICBC Indonesia                           81.273.937.784            81.419.449.907         79.806.521.332                       PT Bank ICBC Indonesia
   Jumlah Pihak Ketiga                           1.710.530.647.711         1.701.744.784.291      1.669.504.709.380                            Total Third Parties
   Diskonto belum diamortisasi                  (1.057.868.746.951)    (1.071.141.482.344)       (1.050.283.649.898)                        Unamortized discount
    Pihak Berelasi - Nilai tercatat bersih         652.661.900.760          630.603.301.947         619.221.059.482        Related Parties - Net carrying amount
   Jumlah                                        1.530.302.909.576         1.308.275.651.721      1.276.080.431.562                                             Total

   *) Disajikan Kembali pada Catatan 45                                                                                                      *) As restated in Note 45

    Mulai   September      2022, melalui    Perjanjian                                Starting September 2022, through the Reconciliation
    Perdamaian yang ditetapkan dalam Surat Pengadilan                                 Agreement stipulated in the Special Class IA Central
    Negeri    Jakarta    Pusat    Klas   IA   Khusus                                  Jakarta District Court No. W10.U1.2868.Ht
    No W10.U1.2868.Ht.03.VI.2022.RIN tanggal 30 Juni                                  03.VI.2022.RIN dated June 30, 2022 regarding
    2022 perihal Pemberitahuan dan Penyampaian                                        Notification and Submission of Copies of Commercial
    Salinan       Penetapan        Perkara      Niaga                                 Case Determination No.497/Pdt.Sus/PKPU/2021/
    No 497/Pdt.Sus/PKPU/2021/PN.Niaga.Jkt.Pst.terkait                                 PN.Niaga.Jkt.Pst. related to special provisions for
    ketentuan khusus restrukturisasi telah ditetapkan                                 debt restructuring, the following interest rates or profit
    untuk bunga atau bagi hasil (kecuali Bank DKI)                                    sharing (except Bank DKI) have been determined
    sebagai berikut (Catatan 43):                                                     (Note 43):

    i.     Pada tahun ke 1 sampai 9 setelah tanggal                                    i.      In the 1st to 9th year after the effective date, 2%
           berlaku, sebesar 2% pertahun dari Utang                                             per annum of the Financial Creditor's Tranche A
           Tranche A Kreditur Finansial;                                                       Payable;
   ii.     Pada tahun ke 10 sampai 13 setelah Tanggal                                 ii.      In the 10th to 13th years after the Effective Date,
           Berlaku, sebesar 3% per-tahun dari Utang                                            3% per annum of the Financial Creditor's
           Tranche A Kreditur Finansial; dan                                                   Tranche A Payable; and
   iii.    Di atas tahun ke 14 setelah Tanggal Berlaku,                              iii.      Over the 14th year after the Effective Date, 4%
           sebesar 4% per-tahun dari Utang Tranche A                                           per annum of Financial Creditor Tranche A
           Kreditur Finansial.                                                                 Payable.

    Beban bunga dan bagi hasil yang dibebankan ke laba                                Interest expense and profit sharing charged to profit or
    rugi adalah sebagai berikut (Catatan 33):                                         loss were as follows (Note 33):




                                                                      81
Page 85
                                                                                                           The original financial statements included herein are in
                                                                                                                                         the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                                           PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                                                   NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                                         JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                                      30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                                         ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                                        (UNAUDITED)

                                                                       30 Juni/          30 Juni/
                                                                       June 30,          June 30,
                                                                         2023              2022
                                                                          Rp                Rp

   Kredit modal kerja                                                                                                                                    Working capital loans
     Pihak berelasi (Catatan 37)                                                                                                                     Related parties (Note 37)
       PT Bank Rakyat Indonesia (Persero) Tbk                          13.899.296.776    38.130.325.991                              PT Bank Rakyat Indonesia (Persero) Tbk
       PT Bank Negara Indonesia (Persero) Tbk                          10.113.363.344    20.229.186.109                              PT Bank Negara Indonesia (Persero) Tbk
       PT Bank Mandiri (Persero) Tbk                                   43.111.058.145                 --                                          PT Bank Mandiri (Persero) Tbk
       Bank Syariah Indonesia                                                                                                                         Bank Syariah Indonesia
          (d/h PT Bank BRI Syariah Tbk dan PT Bank Mandiri Syariah)    25.343.016.829    19.650.000.002     (formerly PT Bank BRI Syariah Tbk and PT Bank Mandiri Syariah)
     Jumlah                                                            92.466.735.094    78.009.512.102                                                                   Total

     Pihak ketiga                                                                                                                                             Third parties
       PT Bank DKI                                                      3.714.022.603    34.493.153.271                                                      PT Bank DKI
       PT Bank Tabungan Pensiunan Nasional Tbk                         11.393.187.878    24.545.440.211                           PT Bank Tabungan Pensiunan Nasional Tbk
       PT Bank Permata Tbk                                             15.984.307.256    21.771.099.235                                              PT Bank Permata Tbk
       PT Bank CTBC Indonesia                                           6.551.251.860    14.329.166.668                                          PT Bank CTBC Indonesia
       PT BCA Syariah                                                   3.254.210.275     4.593.029.558                                                   PT BCA Syariah
       PT Bank ICBC Indonesia                                           1.390.510.406     3.604.198.419                                           PT Bank ICBC Indonesia
     Jumlah                                                            42.287.490.278   103.336.087.362                                                                  Total
   Jumlah bunga dari pinjaman bank                                    134.754.225.372   181.345.599.464                                           Total interest on bank loans


   Utang Obligasi                                                      11.646.026.663    98.000.000.000                                                         Bond Payable
   Provisi                                                               371.649.086            630.094                                                              Provision
   SCF                                                                  1.200.195.305                 --                                                                  SCF
   SKBDN                                                                 718.406.934                  --                                                               SKBDN
   Jumlah beban bunga                                                 148.690.503.360   279.346.229.558                                                           Interest loan



   Kredit Modal Kerja                                                                        Working Capital Loans

   1.        PT Bank Rakyat Indonesia (Persero) Tbk                                          1.      PT Bank Rakyat Indonesia (Persero) Tbk (BRI)
             (BRI)

             Berdasarkan Surat dari Bank BRI No. R.II.206-                                           Based on the Letter from Bank BRI
             OPK/DKD/07/2020 tanggal 17 Juli 2020                                                    No.       R.II.206-OPK/     DKD/07/2020     dated
             mengenai penawaran putusan kredit, telah                                                July 17, 2020 regarding credit decision offer, the
             disetujui fasilitas Kredit Modal Kerja Konstruksi                                       Construction Working Capital (CWC) Facility has
             (KMKK)          dengan       plafond     sebesar                                        been approved with a maximum credit limit of
             Rp1.000.000.000.000 dan fasilitas Supply Chain                                          Rp1,000,000,000,000        and    Supply   Chain
             Financing sebesar Rp250.000.000.000 bersifat                                            Financing Facility with a maximum credit limit of
             interchangeable dengan fasilitas KMKK, dengan                                           Rp250,000,000,000 interchangeably with CWC
             suku bunga 9,25% dan jangka waktu 30 Mei                                                facitlity, with an interest rate of 9.25% for the
             2020 sampai dengan 30 Mei 2021.                                                         period from May 30, 2020 to May 30, 2021.

             Berdasarkan Surat dari Bank BRI No. R.IV.45-                                            Based on the Letter from Bank BRI
             CRO/BCO/08/2021 tanggal 20 Agustus 2021                                                 No.     R.IV.45-CRO/BCO/08/2021                 dated
             mengenai penawaran putusan kredit, telah                                                August 20, 2021 regarding credit decision offer,
             disetujui fasilitas Modal Kerja Konstruksi (KMKK)                                       the Construction Working Capital Facility has
             dengan plafond sebesar Rp1.000.000.000.000                                              been    approved        with     a     ceiling     of
             dan fasilitas Layanan Urun Dana sebesar                                                 Rp1,000,000,000,000 with KMKK facitlity and the
             Rp250.000.000.000 bersifat interchangeable                                              Supply     Chain       Financing       facility     of
             dengan fasilitas KMKK, dengan suku bunga                                                Rp250,000,000,000 is interchangeable with the
             9,00% p.a. dan jangka waktu 30 Agustus 2021                                             KMKK facility, with an interest rate of 9% p.a. and
             sampai dengan 30 November 2021.                                                         the period from August 30, 2021 to
                                                                                                     November 30, 2021.

             Fasilitas pinjaman ini dijamin dengan piutang                                           The loan facility is collateralized and bounded by
             usaha yang diikatkan secara cessie minimal                                              cessie with minimum cover of 120% of the
             meng-cover sebesar 120% dari outstanding                                                outstanding loans and collateral according to SHT
             pinjaman dan agunan sesuai SHT 209/2017 di                                              209/2017 in Gasing Village, Talang Kelapa
             Desa Gasing Kecamatan Talang Kelapa,                                                    District, Banyuasin Regency, South Sumatra
             Kabupaten Banyuasin, Provinsi Sumatera                                                  Province amounting to Rp41,651,000,000. As
             Selatan senilai Rp41.651.000.000. Sebagai                                               additional      information,      the     Company
             tambahan       informasi,  Perusahaan    telah                                          has received a Letter reviewing the Binding of
             menerima surat Review Pengikatan Agunan                                                 Loan         Facility         Collateral      from
             Fasilitas        Pinjaman      dari     Bank                                            Bank BRI No. B.13a-ITG/CON/01/2022 dated
                                                                                  82
Page 86
                                                                            The original financial statements included herein are in
                                                                                                          the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                   PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                           NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                 JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                              30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                 ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                (UNAUDITED)

       BRI No. B.13a-ITG/CON/01/2022 tanggal                          January 12, 2022 regarding the binding of the
       12 Januari 2022 sehubungan dengan pengikatan                   Company's asset collateral.
       jaminan aset Perusahaan.

       Adapun perubahan atas negative covenants                       As for changes to negative covenants, without
       yang diatur adalah tanpa terlebih dahulu                       prior written approval from BRI, debtors are not
       memperoleh persetujuan tertulis dari BRI, debitur              permitted, but not limited to receiving new loans/
       tidak diperkenankan antara lain tetapi tidak                   financing from banks or other financial
       terbatas pada menerima pinjaman/ pembiayaan                    institutions, which causes the Company's Debt to
       baru dari bank atau lembaga keuangan lainnya                   Equity Ratio to exceed 300%.
       yang menyebabkan rasio Debt to Equity Ratio
       Perusahaan melebihi 300%.

       Pembatasan terhadap tindakan:                                  Restriction of covenants:

       1.   Mengikatkan diri sebagai penjamin terhadap                1.   Cannot act as guarantor for another party
            pihak lain dan/atau menjaminkan kekayaan                       and/or pledge the Company’s assets to other
            debitur kepada pihak lain, kecuali yang                        parties, except those already existing.
            sudah ada saat ini.
       2.   Mengajukan permohonan pernyataan pailit                   2.   File for bankruptcy to the Commercial Court.
            kepada Pengadilan Niaga.
       3.   Menyewakan aset yang dijaminkan di Bank                   3.   Lease the tangible assets used as collateral
            atau lembaga keuangan lainnya.                                 to banks or other financial institutions.
       4.   Melunasi/membayar        utang      kepada                4.   Settle/repay the loan to shareholders/the
            pemegang       saham/utang     Perusahaan                      Company's debts in advance before the bank
            sebelum utang di bank dilunasi terlebih                        loan is repaid.
            dahulu.
       5.   Melakukan tindakan merger, akuisisi, go                   5.   Perform corporate action such as mergers,
            public dan penjualan aset Perusahaan.                          acquisitions, initial public offering and sell the
            Menerima pinjaman/pembayaran baru dari                         Company’s          assets.       Obtain      new
            BRI atau lembaga keuangan lainnya.                             loans/financing from BRI or other financial
                                                                           institutions.

       Pada tanggal 30 Juni 2023, 31 Desember 2022                    As of June 30, 2023, December 31, 2022 and
       dan 30 Juni 2022, saldo pinjaman bank jangka                   June 30, 2022, the balance of long-term bank
       panjang        masing-masing         sebesar                   loans    amounted   to   Rp863,227,418,096,
       Rp863.227.418.096, Rp865.933.755.661 dan                       Rp865,933,755,661    and    849,173,632,753,
       Rp849.173.632.753.                                             respectively.

       Berdasarkan hasil putusan PKPU, Pinjaman                       Based on PKPU results, BRI loans with carrying
       BRI     dengan      nilai   tercatat  sebesar                  amount of Rp805,291,190,760 and accrued
       Rp805.291.190.760 dan utang bunga sebesar                      interest of Rp57,936,227,336 were restructured
       Rp57.936.227.336 direstrukturisasi sebagai                     as long-term bank loan (Note 43). The difference
       pinjaman bank jangka panjang (Catatan 43).                     of Rp547,984,048,567 between the fair value of
       Selisih sebesar Rp547.984.048.567 antara                       the new loan amounting to Rp315,243,369,529
       nilai    wajar    pinjaman     baru   sebesar                  (including accrued interest) and the carrying
       Rp315.243.369.529 (termasuk utang bunga)                       amount of the old loan (including accrued interest)
       dengan nilai tercatat pinjaman lama (termasuk                  was recognized as gain on modification of debt
       bunga) diakui sebagai keuntungan atas                          under “other income – net” in profit or loss
       modifikasi utang pada “pendapatan lain-lain -                  (Note 32).
       bersih” dalam laba rugi (Catatan 32).

       Pinjaman BRI akan jatuh tempo pada tahun ke                    BRI loans will be due on the 17th year from
       17 sejak Tanggal Efektif.                                      Effective Date.

       Amortisasi diskonto untuk tahun yang berakhir                  Amortization of discount for the year ended June
       pada 30 Juni 2023 dan 31 Desember 2022                         30, 2023, and December 31, 2022, amounted to
       masing-masing sebesar Rp12.267.925.666 dan                     Rp12,267,925,666       and      Rp4,028,277,353,
       Rp4.028.277.353, yang diakui sebagai bagian                    respectively, which is recognized as part of
       dari beban keuangan pada laporan laba rugi dan                 finance charges in the statement of profit or loss
       penghasilan komprehensif lain.                                 and other comprehensive income.


                                                           83
Page 87
                                                                               The original financial statements included herein are in
                                                                                                             the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                     PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                             NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                   JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                   ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                  (UNAUDITED)

   2.   PT Bank Syariah Indonesia (d/h PT Bank                      2.   PT Bank Syariah Indonesia (formerly
        Mandiri Syariah, PT Bank BNI Syariah dan PT                      PT Bank Mandiri Syariah, PT Bank BNI
        Bank BRI Syariah)                                                Syariah and PT Bank BRI Syariah)

        Berdasarkan perjanjian pemberian line facility                   Based on Musyarakah facility agreement No. 13
        Musyarakah No. 13 tanggal 17 Oktober 2016                        dated October 17, 2016, which was last extended
        danfasilitas ini telah diperpanjang berdasarkan                  based on the letter No. B.04/SP3/FSD/01-2021
        surat No. B.04/SP3/FSD/01-2021 tanggal                           dated January 27, 2021, the Line Musyarakah
        27 Januari 2021, Line Musyarakah Facility                        Facility with a maximum credit limit of
        dengan plafon maksimal Rp470.000.000.000,                        Rp470,000,000,000, maturity date up to
        jatuh tempo sampai dengan 27 Februari 2022                       February 27, 2022 and profit sharing ratio to be
        dan nisbah bagi hasil akan ditentukan kemudian                   determined later when disbursing with an
        saat pencairan dengan indikasi expense yield                     indication that the current bank yield is 8%
        Bank saat ini sebesar 8% efektif per tahun.                      effective per year.

        Selama masa pembiayaan berlangsung maka                          During the financing period, the Company is not
        Perusahaan tidak diperkenankan melakukan                         permitted to carry out the following actions without
        tindakan-tindakan di bawah ini tanpa persetujuan                 written consent from BSI:
        tertulis dari BSI:

        a.   Mengadakan merger dengan perusahaan                         a.   Hold a merger with another company;
             lain;
        b.   Membayar/melunasi sebagian atau seluruh                     b.   Pay/ pay off part or all of the loan from the
             pinjaman dari pemegang saham;                                    shareholders;
        c.   Mengubah bentuk atau status badan hukum                     c.   Change the form or status of the legal entity
             perseroan, merubah anggaran dasar                                of the Company, amending the Company's
             Perusahaan,              memindahtangankan                       articles of association, transferring recipients
             penerima atau saham baik antar pemegang                          or shares both among shareholders and
             saham maupun pihak lain;                                         other parties;
        d.   Mengagunkan,            menyewakan     dan                  d.   Appoint, lease and transfer assets
             mengalihkan aset yang dijaminkan kepada                          guaranteed to creditors or other parties;
             kreditur atau pihak lainnya;
        e.   Melakukan investasi baru pada bidang                        e.   Make new investments in business fields that
             usaha yang tidak secara langsung berkaitan                       are not directly related to the customer's core
             dengan bisnis inti nasabah;                                      business;
        f.   Menjual sebagian atau seluruh aset                          f.   Sells part or all of the Company's assets,
             Perusahaan, diluar kegiatan operasional                          excluding the Company's operational
             Perusahaan;                                                      activities;
        g.   Mengajukan       pailit   atau   penundaan                  g.   File a bankruptcy or delay in payment;
             pembayaran;
        h.   Menarik kembali modal yang telah disetor                    h.   Withdrawing capital paid by shareholders;
             oleh para pemegang saham;
        i.   Merubah pemegang saham mayoritas                            i.   Change the majority shareholder of the
             Perseroan.                                                       Company.

        Fasilitas pinjaman ini dijaminkan dengan:                        This loan facility is collateralized by:

        1.   Jumlah tagihan (seluruh hak, wewenang,                      1.   The amount of the bill (all rights, powers, bills
             tagihan serta klaim-klaim) yang dimiliki                         and claims) that the Company has to the
             Perusahaan kepada bouwheer atas kontrak-                         bouwheer for the work contracts underlying
             kontrak pekerjaan yang menjadi underlying                        the disbursement in BSI.
             pencairan di BSI.
        2.   Persediaan berupa barang jadi (Beton                        2.   Inventories in the form of finished goods
             Precast) dan/atau bahan material berupa                          (Precast Concrete) and/or raw materials in
             pasir, batu, semen, besi/baja, dan lain-lain.                    the form of sand, stone, cement, iron/steel,
                                                                              and others.

        Nilai fidusia atas jaminan berupa tagihan dan                    Fiduciary value of receivables and inventories
        persediaan adalah senilai Rp750.000.000.000                      provided    as    collaterals  amounting    to
        (Catatan 6 dan 8).                                               Rp750,000,000,000 (Notes 6 and 8).



                                                             84
Page 88
                                                                            The original financial statements included herein are in
                                                                                                          the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                   PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                           NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                 JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                              30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                 ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                (UNAUDITED)

       Perusahaan diwajibkan untuk menjaga Debt                       The Company should maintain net income (after
       Service Coverage Ratio (EBITDA dibandingkan                    tax deduction) compared to total liabilities
       total kewajiban Bank) minimal 1,1 kali dan                     (COPAT/Financing Payment) at least 1.1 times
       Leverage maksimal 5 kali.                                      and maximum Leverage of 5 times.

       Berdasarkan Surat dari BSI nomor 03/026-                       Based on the Letter from BSI number 03/026-
       3/CMG tanggal 24 Maret 2023 perihal Surat                      3/CMG dated March 24, 2023 regarding the Letter
       penyampaian tagihan kewajiban PT Waskita                       of submission of PT Waskita Beton Precast Tbk
       Beton Precast Tbk (WSBP) ke PT Bank Syariah                    (WSBP) liability bills to PT Bank Syariah
       Indonesia Tbk (BSI) atas fasilitas supplier                    Indonesia Tbk (BSI) for supplier financing
       financing yang masuk dalam kategori kreditur                   facilities that fall into the category of congruent
       kongkuren sesuai Putusan Homologasi Nomor                      creditors according to the Decision Homologation
       497/Pdt.Sus-PKPU/2021/PN.Niaga.Jkt.Pst,                        Number 497/Pdt.Sus-PKPU/2021/PN.Niaga.Jkt.
       dengan ini disampaikan hal-hal berikut:                        Pst, we hereby submit the following:
       1. Total tagihan kepada BSI sebagai Kreditur                   1. Total claims to BSI as Concurrent Creditors
             Konkuren (Fasilitas SCF) adalah sebesar                        (SCF         Facility)      amounted          to
             Rp187.665.894.478                                              Rp187,665,894,478
       2.     Tunggakan Kewajiban sebelum Putusan                     2. Arrears of Liability prior to Homologation
             Homologasi sebesar Rp9.984.667.552                             Decision of Rp9,984,667,552
       3. Pembayaran kewajiban PT Waskita Beton                       3. Payment of obligations of PT Waskita Beton
             Precast, Tbk. ke PT. Bank Syariah                              Precast, Tbk. to PT. We charge Bank Syariah
             Indonesia atas fasilitas Supplier Financing                    Indonesia for the Supplier Financing facility of
             kami tagihkan sebesar Rp284.119.681.211                        Rp284,119,681,211 (according to the
             (sesuai skedul yang tertera pada surat).                       schedule stated in the letter).
       4.   Atas pembayaran tagihan ujrah pada bulan                  4. For payment of ujrah bills in March 2023 in the
             Maret 2023 sebesar Rp1.913.420.518 agar                        amount of Rp1,913,420,518 to be reserved
             dicadangkan oleh PT Waskita Beton                              by PT Waskita Beton Precast to the BSI
             Precast ke rekening escrow BSI                                 escrow account 7231185636 a.n. PT Waskita
             7231185636 a.n. PT Waskita Beton                               Beton Precast
             Precast
       5. Pendebetan atas ujrah tersebut akan kami                    5. The debit for the ujrah will be carried out after
             dilakukan setelah proses novasi atas                        the novation process for the SCF facility at BSI
             fasilitas SCF di BSI terselesaikan.                         is completed.

       Pada tanggal 30 Juni 2023, 31 Desember 2022                    As of June 30, 2023, December 31, 2022 and
       dan 30 Juni 2022, saldo pinjaman bank jangka                   June 30, 2022, the balance of long-term bank
       panjang Perusahaan kepada PT Bank Syariah                      loan of the Company to PT Bank Syariah
       Indonesia   Tbk    masing-masing     sebesar                   Indonesia Tbk amounted to Rp698,440,760,706,
       Rp698.440.760.706, Rp503.134.616.379 dan                       Rp503,134,616,379 and Rp494,854,616,379,
       Rp494.854.616.379.                                             respectively.

       Berdasarkan hasil putusan PKPU, Pinjaman BSI                   Based on PKPU results, BSI loans with carrying
       dengan         nilai      tercatat    sebesar                  amount of Rp645,166,519,380 and accrued
       Rp645.166.519.380 dan utang bunga sebesar                      interest of Rp53,274,241,326 were restructured
       Rp53.274.241.326 direstrukturisasi sebagai                     as long-term bank loan (Note 43). The difference
       pinjaman bank jangka Panjang (Catatan 43).                     of Rp443,376.088.053 between the fair value of
       Selisih sebesar Rp443.376.088.053 antara                       the new loan amounting to Rp255,064,672,653
       nilai    wajar     pinjaman     baru  sebesar                  (including accrued interest) and the carrying
       Rp255.064.672.653 (termasuk utang bunga)                       amount of the old loan (including accrued interest)
       dengan nilai tercatat pinjaman lama (termasuk                  was recognized as gain on modification of debt
       utang bunga) diakui sebagai keuntungan atas                    under “other income – net” in profit or loss (Note
       modifikasi utang pada “pendapatan lain-lain –                  32).
       bersih” dalam laba rugi (Catatan 32).

       Pinjaman BSI akan jatuh tempo pada tahun ke                    BSI loans will be due on the 17th year from
       17 sejak Tanggal Efektif.                                      Effective Date.

       Amortisasi diskonto untuk tahun yang berakhir                  Amortization of discount for the year ended June
       pada 30 Juni 2023 dan 31 Desember 2022                         30, 2023, and December 31, 2022, amounted to
       masing-masing sebesar Rp9.926.027.782 dan                      Rp9,926,027,782       and       Rp2,340,555,230,
       Rp2.340.555.230, yang diakui sebagai bagian                    respectively, which is recognized as part of


                                                           85
Page 89
                                                                               The original financial statements included herein are in
                                                                                                             the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                     PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                             NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                   JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                   ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                  (UNAUDITED)

        dari beban keuangan pada laporan laba rugi dan                   finance charges in the statement of profit or loss
        penghasilan komprehensif lain.                                   and other comprehensive income.

   3.   PT Bank Negara Indonesia (Persero) Tbk                      3.   PT Bank Negara Indonesia (Persero) Tbk (BNI)
        (BNI)

        Berdasarkan surat No. BIN/2.2/094/R tanggal                      According to letter No. BIN/2.2/094/R dated
        10 Juni 2015, Perusahaan memperoleh fasilitas                    June 10, 2015, the Company entered into the
        kredit dari PT Bank Negara Indonesia (Persero)                   credit facilities from PT Bank Negara Indonesia
        Tbk sebagai berikut:                                             (Persero) Tbk as follows:

        •   Kredit modal kerja Revolving sebesar                         •   Revolving working capital loan amounting to
            Rp50.000.000.000, dengan jangka waktu                            Rp50,000,000,000, with a term of 12 months
            selama 12 bulan sejak tanggal 23 Juni 2015                       from June 23, 2015 until June 23, 2016.
            sampai dengan tanggal 23 Juni 2016. Kredit                       Revolving working capital loan has been
            modal kerja Revolving tersebut telah diakta                      notarized based on loan agreement No. 150
            notariskan berdasarkan perjanjian kredit                         dated June 23, 2015. Based on the Approval
            No. 150 tanggal 23 Juni 2015. Berdasarkan                        of Amendment to the Credit Agreement, the
            Persetujuan Perubahan Perjanjian Kredit,                         period of extension is until June 22, 2020,
            jangka waktu perpanjangan sampai dengan                          with change in the effective interest rate to
            22 Juni 2020 dengan perubahan suku bunga                         9.50%.
            efektif sebesar 9,50%.

            Berdasarkan       Surat      dari    BNI                         Based     on    a     letter   from      BNI
            No. KPS3/2.2/204.IR tanggal 19 Mei 2021,                         No. KPS3/2.2/204.IR dated May 19, 2021,
            telah dilakukan perpanjangan jangka waktu                        the term has been extended until
            sampai dengan 26 Maret 2022, dengan suku                         March 26, 2022, with an interest rate of 8%.
            bunga menjadi 8%.

        •   Kredit    modal    transaksional    sebesar                  •   Transactional       working    capital loan
            Rp300.000.000.000, dengan jangka waktu                           amounting to Rp300,000,000,000, with a
            selama 12 bulan sejak tanggal 23 Juni 2015                       term of 12 months from June 23, 2015, until
            sampai dengan tanggal 23 Juni 2016. Kredit                       June 23, 2016. Transactional working capital
            modal     transaksional    tersebut    telah                     loan has been notarized based on loan
            diaktanotariskan berdasarkan perjanjian                          agreement No. 151 dated June 23, 2015.
            kredit No. 151 tanggal 23 Juni 2015.                             Based on the Approval of Amendment to the
            Berdasarkan      Persetujuan     Perubahan                       Credit Agreement, the period of extension is
            Perjanjian     Kredit,    jangka      waktu                      until June 22, 2020, with change in the
            perpanjangan sampai dengan 22 Juni 2020                          effective interest rate to 9.50%.
            dengan perubahan suku bunga efektif
            sebesar 9,50%.

            Berdasarkan       Surat      dari    BNI                         Based    on    the    letter    from     BNI
            No. KPS3/2.2/204.IR tanggal 19 Mei 2021,                         No. KPS3/2.2/204.IR dated May 19, 2021,
            telah dilakukan perpanjangan jangka waktu                        the term has been extended until
            sampai dengan 26 Maret 2022, dengan suku                         March 26, 2022, with an interest rate of 8%.
            bunga menjadi 8%.

        •   Kredit modal kerja Layanan Urun Dana                         •   Working capital Supply Chain Financing
            (SCF), bank garansi dan letter of credit (L/C)                   (SCF), bank guarantee and letter of credit
            atau SKBDN Rp300.000.000.000, jangka                             (L/C) or SKBDN, working capital loan of
            waktu pinjaman selama 12 bulan sejak                             Rp300,000,000,000, the term of the loan is
            tanggal 23 Juni 2015 dan jatuh tempo                             for 12 months since June 23, 2015 and will
            23 Juni 2016. Fasilitas telah diperpanjang                       be due on June 23, 2016. The facility has
            berdasarkan Persetujuan perpanjangan                             been extended based on the letter of
            fasilitas kredit No. BIN/2.2/207/R sampai                        approval for extension of credit facility
            dengan tanggal 22 Juni 2021.                                     No. BIN/2.2/207/R up to June 22, 2021.

        •   Plafond    non-cash     loan     sebesar                     •   Non-cash loan plafond amounted to
            Rp50.000.000.000, jangka waktu pinjaman                          Rp50,000,000,000, the term of loan is up to
            sampai dengan tanggal 26 Maret 2022.                             March 26, 2022.

        •   Kredit modal kerja post financing sebesar                    •   Post financing transactional working capital
            Rp214.949.532.620, jangka waktu pinjaman                         loan amounted to Rp214,949,532,620, the
            sampai dengan tanggal 31 Desember 2021                           term of loan is up to December 31, 2021 with

                                                             86
Page 90
                                                                                The original financial statements included herein are in
                                                                                                              the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                    PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                            NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                  JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                               30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                  ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                 (UNAUDITED)

            dengan perubahan suku bunga efektif                             change in the effective interest rate to 8.00%
            sebesar 8,00% p.a.                                              p.a.

       Berdasarkan surat No. KPS3/4.1/140/R tanggal                    Based on letter No. KPS3/4.1/140/R date June
       23 Juni 2022, Perusahaan memperoleh                             23, 2022, the Company obtained a Temporary
       Perpanjangan Sementara Fasilitas Kredit dari PT                 Extension of the Credit Facility from PT Bank
       Bank Negara Indonesia (Persero) Tbk sebagai                     Negara Indonesia (Persero) Tbk as follows:
       berikut:

       •    Kredit     modal       kerja      Revolving                •    Revolving      working capital      loan of
            Rp50.000.000.000, jangka waktu pinjaman                         Rp50,000,000,000,          the    term   of
            diperpanjang sementara sampai dengan                            the loan is temporarily extended until
            tanggal 26 September 2022 dengan                                September 26, 2022, with change in the
            perubahan suku bunga efektif sebesar                            effective interest rate to 8.00% p.a.
            8,00% p.a.
       •    Kredit        modal           transaksional                •    Transactional         capital     loan of
            Rp300.000.000.000, jangka waktu pinjaman                        Rp300,000,000,000, the term of the
            diperpanjang sementara sampai dengan                            loan is temporarily extended until
            tanggal 26 September 2022 dengan                                September 26, 2022, with change in the
            perubahan suku bunga efektif sebesar                            effective interest rate to 8.00% p.a.
            8,00% p.a.
       •    Kredit modal kerja post financing sebesar                  •    Post-financing      working    capital     loan
            Rp214.949.532.620, jangka waktu pinjaman                        amounting to Rp214,949.532,620, the term
            diperpanjang sementara sampai dengan                            of the loan is temporarily extended until June
            tanggal 30 Juni 2023 dengan perubahan                           30, 2023 with a change in the effective
            suku bunga efektif sebesar 8,00% p.a.                           interest rate to 8.00% p.a.

       Fasilitas pinjaman ini dijamin dan diikat dengan:               The loan facilities are collaterized by:

       •    Tagihan term-in atas proyek yang dibiayai.                 •    Term-in bills on financed projects.
       •    Tanah dan Bangunan yang terletak di                        •    Land and Buildings located at Jl. Raya
            Jl. Raya Sadang – Subang No.28 KM 15,                           Sadang - Subang No.28 KM 15, Kampung
            Kampung Mekarsari, RT 05 RW 02, Desa                            Mekarsari, RT 05 RW 02, Cibatu Village,
            Cibatu, Kec.Cibatu, Kab. Purwakarta,                            Cibatu Kec.Cibatu, Purwakarta Regency,
            Jawa Barat sesuai SHT No.2342/2015                              West Java according to SHT No.2342/2015
            dan    SHT      No.02440/2021        sebesar                    and SHT No.02440/2021 amounting to
            Rp168.487.004.000.                                              Rp168,487,004,000.
       •    Tanah dan Bangunan yang terletak di Jl.                     •    Land and Buildings located at Jl. Imam
            Imam Bonjol No.52, Desa Kalijaya, Kec.                           Bonjol No.52, Kalijaya Village, West
            Cikarang Barat, (dhi. Cibitung), Kab. Bekasi,                    Cikarang District, (dhi. Cibitung), Bekasi
            Jawa Barat sesuai SHT. 03410/2016                                Regency, West Java according to SHT.
            sebesar Rp58.218.498.201.                                        03410/2016            amounting         to
                                                                             Rp58,218,498,201.

       Sebagai tambahan informasi, Perusahaan telah                    As additional information, the Company has
       menerima Surat Keputusan Kredit (SKK)                           received a letter from BNI No. KPS3/2.2/204
       No. KPS3/2.2/204 tanggal 19 Mei 2021                            dated May 19, 2021 regarding the binding of the
       sehubungan dengan pengikatan jaminan aset                       Company's asset collateral.
       Perusahaan.

       Pembatasan:                                                     Negative covenants:

       1.   Melakukan perubahan kegiatan usaha                         1. Change the business activities as stated in
            sebagaimana tercantum dalam Anggaran                          the Articles of Association that can reduce
            Dasar yang dapat mengurangi kemampuan                         the Company’s ability to pay off the credit
            Perusahaan melunasi fasilitas kredit;                         facility;

       2.   Menjual atau memindahkan hak atau                          2. Sell or transfer all of the assets of the
            mengalihkan   seluruh    atau     sebagian                    Company in a single transaction or in
            kekayaan/ aset dalam satu transaksi atau                      multiple transactions, except:
            dalam beberapa transaksi kecuali:

            •   Menjual atau mengalihkan aset dengan                        •      Selling or transferring assets under

                                                            87
Page 91
                                                                             The original financial statements included herein are in
                                                                                                           the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                  PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                          NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                             30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                               (UNAUDITED)

                ketentuan yang bersifat arm’s length                            arragement that are at arm’s length and
                dan dalam rangka menjalankan usaha                              in order to run the daily business
                sehari-hari;                                                    activities;
            •   Menjual atau dengan cara lain                            •      Selling or transferring assets as a
                mengalihkan aset sebagai ganti atau                             replacement or to be replaced with
                digantikan aset lainnya yang sebanding                          another comparable assets or better in
                atau lebih baik tipe, sifat dan                                 type, nature, and quality;
                kualitasnya;
            •   Menjual atau mengalihkan aset dalam                      •      Selling or transferring assets for
                rangka pelaksanaan reorgarnisasi oleh                           the     purpose      of     Government
                Pemerintah       Republik     Indonesia                         reorganization of Republic of Indonesia
                sepanjang penjualan aset tersebut tidak                         as long as the sale of assets did not
                mempunyai akibat material; dan                                  have a material result; and
            •   Menjual atau mengalihkan aset yang                       •      Selling or transferring assets that are
                sudah tidak berguna atau tidak dipakai                          not useful or not used with the
                lagi dengan ketentuan yang bersifat                             requirements of arm’s length.
                arm’s length.

       3.   Mengubah usaha yang sekarang dijalankan/                 3. Change the operation of current business
            diusahakan yang dapat menimbulkan akibat                    that may cause material impact unless
            material, kecuali dipersyaratkan oleh                       required by applicable law.
            perundang-undangan yang berlaku.

       4.   Melakukan  peleburan,     penggabungan,                  4. Merger, business combination, separation,
            pemisahan,   pembubaran       perseroan                     liquidation or corporate reorganization
            maupun rekonstruksi (tindakan korporasi),                   (corporate action), except:
            kecuali:

            •   Reorganisasi yang dapat dilakukan oleh                   •      Reorganization can be done by
                Pemerintah       Republik     Indonesia                         the Government of Republic Indonesia
                sepanjang memiliki akibat tidak                                 as long as the impact is not material;
                material;
            •   Tindakan korporasi dengan anggota                        •      The corporate actions with other
                lain dalam Perusahaan dengan                                    members in The Company with the
                ketentuan bahwa tindakan korporasi                              provision following the requirements;
                tersebut dilakukan;
            •   Tindakan          korporasi       yang                   •      The Company will be the resurviving
                dipersyaratkan       oleh     peraturan                         legal entity and will have the legal status
                perundang-undangan yang berlaku;                                after the corporate action; and
                dan
            •   Pemisahan       dimana      Perusahaan                   •      Separation in which the Companywill be
                menjadi pemegang saham mayoritas.                               the majority shareholder.

       5.   Melakukan perubahan Anggaran Dasar                       5. Changes in the Articles of Association that
            yang dapat menimbulkan akibat material;                     can lead to a material impact; and
            dan

       6.   Mengajukan permohonan pailit     atau                    6. Propose to file bankruptcy or postponement
            permohonan    penundaan     kewajiban                       of debt payment to authorized parties.
            pembayaran utang kepada instansi yang
            berwenang.

       7.   Memperoleh pinjaman dari       bank   atau               7. Obtain or add a loan from a bank or other
            lembaga keuangan lain.                                      financial institution.

      Pada tanggal 30 Juni 2023, 31 Desember 2022                   As of June 30, 2023, December 31, 2022 and June
      dan 30 Juni 2022, saldo pinjaman bank jangka                  30, 2022, the balance of the Company's long-term
      panjang Perusahaan kepada PT Bank Negara                      bank loans to PT Bank Negara Indonesia (Persero)
      Indonesia (Persero) Tbk masing-masing sebesar                 Tbk      amounted      to     Rp536,267,943,238,
      Rp536.267.943.238, Rp536.476.423.318 dan                      Rp536,476,423,318 and Rp527,473,324,007,
      Rp527.473.324.007.                                            respectively.


                                                          88
Page 92
                                                                        The original financial statements included herein are in
                                                                                                      the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                             PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                     NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022           JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                        30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                           ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                          (UNAUDITED)

      Berdasarkan hasil putusan PKPU, Pinjaman BNI               Based on PKPU results, BNI loans with carrying
      dengan nilai tercatat sebesar Rp500.172.183.961            amount of Rp500,172,183,961 and accrued
      dan utang bunga sebesar Rp36.095.759.277                   interest of Rp36,095,759,277 were restructured as
      direstrukturisasi sebagai pinjaman bank jangka             long-term bank loan (Note 43). The difference of
      Panjang      (Catatan    43).   Selisih  sebesar           Rp340,427,415,177 between the fair value of the
      Rp340.427.415.177 antara nilai wajar pinjaman              new loan amounting to Rp195,840,528,061
      baru sebesar Rp195.840.528.061 (termasuk utang             (including accrued interest) and the carrying
      bunga) dengan nilai tercatat pinjaman (termasuk            amount of the old loan (including accrued interest)
      utang bunga) diakui sebagai keuntungan atas                was recognized as gain on modification of debt
      modifikasi utang pada “pendapatan lain-lain –              under “other income – net” in profit or loss
      bersih” dalam laba rugi (Catatan 32).                      (Note 32).

      Pinjaman BNI akan jatuh tempo pada tahun ke 17             BNI loans will be due on the 17th year from Effective
      sejak Tanggal Efektif.                                     Date.

      Amortisasi diskonto untuk tahun yang berakhir              Amortization of discount for the year ended June
      pada 30 Juni 2023 dan 31 Desember 2022 masing-             30, 2023, and December 31, 2022, amounted to
      masing     sebesar     Rp7.621.276.997      dan            Rp7,621,276,997          and     Rp2,495,659,526,
      Rp2.495.659.526, yang diakui sebagai bagian dari           respectively, which is recognized as part of finance
      beban keuangan pada laporan laba rugi dan                  charges in the statement of profit or loss and other
      penghasilan komprehensif lain.                             comprehensive income.

  4. PT Bank ICBC Indonesia (ICBC)                          4.    PT Bank ICBC Indonesia (ICBC)

      Berdasarkan Perjanjian Kredit No. 167/LOD-                  Based on the Credit Agreement No. 167/LOD-
      CBII/IX/2020 tanggal 24 September 2020,                     CBII/IX/2020 dated September 24, 2020, the
      Perusahaan mendapatkan kredit modal kerja dari              Company obtained a working capital loan from
      PT Bank ICBC Indonesia dengan jumlah fasilitas              PT Bank ICBC Indonesia with total facility
      sebesar Rp350.000.000.000, jangka waktu                     amounting to Rp350,000,000,000, with loan
      pinjaman sampai dengan 17 September 2021                    period until September 17, 2021 and
      dengan suku bunga sebesar 9,75% per tahun                   the interest rate of 9.75% per annum (floating).
      (floating). Berdasarkan Perubahan Perjanjian                Based          on   the      Credit    Agreement
      Kredit     No.   035/ICBCI-WSM/PTD/XI/2020/P3               No. 035/ICBCI-WSM/PTD/XI/2020/P3 dated
      tanggal 21 Juni 2022, Perusahaan mendapatkan                June 21, 2022, the Company obtained a working
      kredit modal kerja dari PT Bank ICBC Indonesia              capital loan from PT Bank ICBC Indonesia with
      dengan         jumlah      fasilitas   sebesar              total facility amounting to Rp73,523,809,678, with
      Rp73.523.809.678, jangka waktu pinjaman sampai              loan period until October 22, 2022, and the
      dengan 22 Oktober 2022 dengan suku bunga                    interest rate of 9.75% per annum.
      sebesar 9,75% per tahun.

       Fasilitas pinjaman ini dijamin dengan:                     This loan facility is collateralized by:

       1.   Piutang usaha Perusahaan yang diikat                   1.   Accounts receivable of the Company bound
            secara fidusia.                                             under fiduciary.
       2.   Sisa nilai atau omzet kontrak WBP -                    2.   Future receivables value or turnover of
            kontraktor yang berasal dari PT Waskita                     WBP-contractor must be PT Waskita Karya
            Karya (Persero) Tbk.                                        (Persero) Tbk.

        Pembatasan:                                                Negative Covenant:

        Menjaminkan aset kepada pihak lain, kecuali                Assuring assets to other parties, except when the
        bilamana Perusahaan menjaga Debt to Equity                 Company maintains Debt to Equity Ratio (DER)
        Ratio (DER) pada maksimal sebesar 3x selama                at a maximum of 3x during the loan period.
        periode pinjaman.

        Pada tanggal 30 Juni 2023, 31 Desember 2022                As at June 30, 2023, December 31, 2022 and
        dan 30 Juni 2022, saldo pinjaman bank jangka               June 30, 2022, the balance of long-term loan of
        panjang Perusahaan kepada PT Bank ICBC                     the Company to PT Bank ICBC Indonesia
        Indonesia       masing-masing        sebesar               amounted          to        Rp81,273,937,783,
        Rp81.273.937.783,    Rp81.419.449.907    dan               Rp81,419,449,907     and    Rp79,806,521,332,
        Rp79.806.521.332.                                          respectively.


                                                     89
Page 93
                                                                         The original financial statements included herein are in
                                                                                                       the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                               PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                       NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022             JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                          30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                             ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                            (UNAUDITED)

         Berdasarkan hasil putusan PKPU, Pinjaman                   Based on PKPU results, ICBC loans with
         ICBC      dengan     nilai   tercatat  sebesar             carrying amount of Rp73,523,809,678 and
         Rp73.523.809.678 dan utang bunga sebesar                   accrued interest of Rp7,750,128,105 were
         Rp7.750.128.105      direstrukturisasi sebagai             restructured as long-term bank loan (Note 43).
         pinjaman bank jangka Panjang (Catatan 43).                 The difference of Rp51,593,381,461 between the
         Selisih sebesar Rp51.593.381.461 antara nilai              fair value of the new loan amounting to
         wajar pinjaman baru sebesar Rp29.680.556.322               Rp29,680,556,322 (including accrued interest)
         (termasuk utang bunga) dengan nilai tercatat               and the carrying amount of the old loan (including
         pinjaman lama (termasuk utang bunga) diakui                accrued interest) was recognized as gain on
         sebagai keuntungan atas modifikasi utang pada              modification of debt under “other income – net” in
         “pendapatan lain-lain – bersih” dalam laba rugi            profit or loss (Note 32).
         (Catatan 32).

         Pinjaman ICBC akan jatuh tempo pada tahun ke               ICBC loans will be due on the 17th year from
         17 sejak Tanggal Efektif.                                  Effective Date.

         Amortisasi diskonto untuk tahun yang berakhir              Amortization of discount for the year ended June
         pada 30 Juni 2023 dan 31 Desember 2022                     30, 2023, and December 31, 2022, amounted to
         masing-masing sebesar Rp1.155.040.498 dan                  Rp1,155,040,498        and        Rp378,758,911,
         Rp378.758.911, yang diakui sebagai bagian dari             respectively, which is recognized as part of
         beban keuangan pada laporan laba rugi dan                  finance charges in the statement of profit or loss
         penghasilan komprehensif lain.                             and other comprehensive income.

    5.   PT Bank BTPN Tbk                                      5.   PT Bank BTPN Tbk

         Berdasarkan perubahan Perjanjian Fasilitas                 Based on the amendment to Facility Agreement
         No. L/2020/WBG/X/07 tanggal 12 Oktober 2020,               No. L/2020/WBG/X/07 dated October 12, 2020,
         Perusahaan memperoleh fasilitas kredit dari                the Company obtained a credit facility from
         PT Bank BTPN Tbk sebagai berikut:                          PT Bank BTPN Tbk as follows:

         1.   Pinjaman untuk tujuan modal kerja sebesar             1.   Loan for working capital purposes
              Rp250.000.000.000, dengan jangka waktu                     amounting to Rp250,000,000,000, with a
              sampai dengan tanggal 30 Juni 2021                         term until June 30 2021, with an interest rate
              dengan suku bunga 9% per tahun.                            of 9% per annum.

         2.   Commercial LC untuk tujuan impor atau                 2.   Commercial LC for purposes of importing or
              pembelian lokal atas bahan baku atau                       local purchasing of raw materials or
              peralatan untuk kegiatan bisnis Perusahaan                 equipment for the Company’s business
              melalui penerbitan LC dan LC usance lokal,                 activities through the issuance of LC and LC
              sight, LC usance, payable at sight (LC                     local usance, sight, LC usance, payable at
              UPAS), LC usance payable at usance (LC                     sight (LC UPAS), LC usance payable at
              UPAU)      sebesar     Rp850.000.000.000,                  usance (LC UPAU) amounting to
              dengan jangka waktu sampai dengan                          Rp850,000,000,000, with the term until
              tanggal 30 Juni 2021.                                      June 30, 2021.

         3.   Acceptance untuk tujuan akseptasi LC                  3.   Acceptance for purposes of LC usance or
              usance ataupun LC lokal sebesar                            local LC of Rp850,000,000,000, with a term
              Rp850.000.000.000, dengan jangka waktu                     of six (6) months.
              enam (6) bulan.

         4.   Loan on note trust receipt untuk tujuan               4.   Loan on note trust receipt for payment of LC
              pembayaran LC ataupun LC lokal sebesar                     or local LC of Rp850,000,000,000, with a
              Rp850.000.000.000, dengan jangka waktu                     term of three (3) months from the LC due
              selama tiga (3) bulan sejak tanggal jatuh                  date or if shorter and may be extended to six
              tempo LC atau apabila lebih singkat dapat                  (6) months from the date of issuance of LC
              diperpanjang hingga enam (6) bulan dari                    or local LC with interest rate of 9% per
              tanggal penerbitan LC ataupun LC lokal,                    annum.
              dengan suku bunga 9% per tahun.

         5.   Guarantee untuk tujuan penerbitan bank                5.   Guarantee for issuance of bank guarantee in
              garansi dalam bentuk payment bond, bid                     the form of payment bond, bid bond,
              bond, performance bond, dan maintenance                    performance bond, and maintenance bond,
              bond, sehubungan dengan bisnis peminjam,                   in connection with the borrower's business
                                                       90
Page 94
                                                                          The original financial statements included herein are in
                                                                                                        the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                        NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022              JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                           30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                              ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                             (UNAUDITED)

             sebesar    Rp850.000.000.000,       dengan                   amounting to Rp850,000,000,000, with a
             jangka waktu selama 12 bulan namun tidak                     period of 12 months but excluding the 30-
             termasuk periode klaim 30 hari kalender.                     day calendar claim period.

        6.   Loan on note account payable financing                 6.    Loan on note accounts payable financing for
             untuk tujuan pembiayaan terkait dengan                       financing purposes related to payments to
             pembayaran kepada supplier peminjam                          the        borrower's      suppliers     of
             sebesar    Rp850.000.000.000,        dengan                  Rp850,000,000,000, with a maximum period
             jangka waktu maksimum selama enam (6)                        of six (6) months and is nonextendable with
             bulan dan bersifat non-rolloverable, dengan                  interest rate of 8.8% per annum.
             suku bunga 8,8% per tahun.

        7.   Loan on note discounted account payable                7.    Loan on note discounted accounts payable
             financing untuk tujuan pembiayaan terkait                    financing for financing purposes related to
             dengan pembayaran kepada supplier                            payments to the borrower's suppliers of
             peminjam sebesar Rp850.000.000.000,                          Rp850,000,000,000, with a maximum period
             dengan jangka waktu maksimum selama                          of six (6) months and is nonextendable with
             enam (6) bulan dan bersifat non-                             interest rate 8.8% per annum.
             rolloverable, dengan suku bunga 8,8% per
             tahun.

        8.   Loan on Note Account Receivable Financing              8.    Loan on Note Accounts Receivable
             untuk tujuan pembiayaan terkait piutang-                     Financing for financing purposes related to
             piutang peminjam terhadap pelanggan                          borrower's receivables to customers
             sebesar    Rp500.000.000.000,        dengan                  amounting to Rp500,000,000,000, with a
             jangka waktu maksimum selama 4 (empat)                       maximum period of 4 (four) months and non-
             bulan dan bersifat non-rolloverable, dengan                  rolloverable, with an interest rate of 8.8% per
             suku bunga 8,8% per tahun.                                   annum.

        Fasilitas pinjaman ini dijamin oleh piutang usaha            These loan facilites are collaterized by all
        saat     ini   atau    akan     datang    dengan             current or future accounts receivable with
        nilai      penjaminan       minimum       sebesar            minimum collateral value amounting to
        Rp1.495.103.746.786 atau 125% dari limit                     Rp1,495,103,746,786 or 125% of the combined
        gabungan yang sudah diikat secara fidusia.                   limit and which has been tied by fiduciary.

        Pembatasan:                                                  Negative covenants:

        1.   Memasang atau mengizinkan adanya atau                   1.    Installing or permitting the presence or
             dipasangnya Hak Jaminan atas aset-                            installation of security rights over its assets;
             asetnya;

        2.   Menjual, mengalihkan, atau melepaskan                   2.    Sell, transfer, or otherwise dispose of its
             aset-asetnya dengan ketentuan-ketentuan                       assets with the provisions in which these
             dimana aset-aset tersebut dapat disewakan                     assets can be leased or bought back by the
             atau dibeli kembali oleh Peminjam;                            Borrower;

        3.   Menjual, mengalihkan, atau melepaskan                   3.    Sell, transfer, or dispose of its receivables
             piutangnya dengan hak regres;                                 with regress rights;

        4.   Mengadakan pengaturan apapun dimana                     4.    Enter into any arrangement where the
             uang atau manfaat bank atau rekening lain                     money or the benefits of a bank or other
             dapat digunakan untuk pembayaran,                             account may be used for payments, made
             dilakukan kompensasi (set off) atau                           compensation (set off) or the possibility of
             dimungkinkannya penggabungan beberapa                         combining multiple accounts;
             rekening; atau

        5.   Mengadakan     pengaturan  prioritas                    5.    Hold priority setting receipts have the same
             penerimaan pembayaran yang memiliki                           effect.
             dampak yang sama.

        Pada tanggal 30 Juni 2023, 31 Desember 2022                  As at June 30, 2023, December 31, 2022 and
        dan 30 Juni 2022 saldo pinjaman bank jangka                  June 30, 2022, the balance of long-term loan of
        panjang Perusahaan kepada PT Bank BTPN Tbk                   the Company to PT Bank BTPN Tbk amounted
                                                        91
Page 95
                                                                            The original financial statements included herein are in
                                                                                                          the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                  PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                          NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                             30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                               (UNAUDITED)

         masing-masing sebesar Rp614.149.511.847,                       to Rp614,149,511,847, Rp614,288,093,575
         Rp614.288.093.575 dan Rp603.253.092.870.                       and Rp603,253,092,870, respectively.

         Berdasarkan hasil putusan PKPU, Pinjaman                       Based on PKPU results, BTPN loans with
         BTPN      dengan     nilai   tercatat sebesar                  carrying amount of Rp544,938,306,400 and
         Rp544.938.306.400 dan utang bunga sebesar                      accrued interest of Rp69,211,205,447 were
         Rp69.211.205.447 direstrukturisasi sebagai                     restructured as long-term bank loan (Note 43).
         pinjaman bank jangka panjang (Catatan 43).                     The difference of Rp389,867,292,063 between
         Selisih sebesar Rp389.867.292.063 antara                       the fair value of the new loan amounting to
         nilai    wajar    pinjaman      baru   sebesar                 Rp224,282,219,784 (including accrued interest)
         Rp224.282.219.784 (termasuk utang bunga)                       and the carrying amount of the old loan
         dengan nilai tercatat pinjaman lama (termasuk                  (including accrued interest) was recognized as
         utang bunga) diakui sebagai keuntungan atas                    gain on modification of debt under “other
         modifikasi utang pada “pendapatan lain-lain –                  income – net” in profit or loss (Note 32).
         bersih” dalam laba rugi (Catatan 32).

         Pinjaman BTPN akan jatuh tempo pada tahun ke                  BTPN loans will be due on the 17th year from
         17 sejak Tanggal Efektif.                                     Effective Date.

         Amortisasi diskonto untuk tahun yang berakhir                 Amortization of discount for the year ended June
         pada 30 Juni 2023 dan 31 Desember 2022                        30, 2023, and December 31, 2022, amounted to
         masing-masing sebesar Rp8.728.106.176 dan                     Rp8,728,106,176       and       Rp2,857,635,240,
         Rp2.857.635.240, yang diakui sebagai bagian                   respectively, which is recognized as part of
         dari beban keuangan pada laporan laba rugi dan                finance charges in the statement of profit or loss
         penghasilan komprehensif lain.                                and other comprehensive income.

    6.   PT Bank CTBC Indonesia (CTBC)                            6.   PT Bank CTBC Indonesia (CTBC)

         Berdasarkan surat No. MKT/EXT/138/VII/2017                    Based on letter No. MKT/EXT/ 138/VII/2017
         tanggal 12 Juli 2017, Perusahaan memperoleh                   dated July 12, 2017, the Company obtained
         fasilitas kredit dari CTBC berupa kredit modal                credit facility from CTBC in the form of working
         kerja sebesar Rp300.000.000.000 dengan                        capital loan amounting to Rp300,000,000,000,
         jangka waktu selama 12 bulan sejak tanggal                    with a term of 12 months from July 12, 2017, until
         12 Juli 2017 sampai dengan tanggal 12 Juli 2018               July 12, 2018, with an interest rate of
         dengan suku bunga JIBOR+2,25% per tahun.                      JIBOR+2.25% per annum. This facility has
         Perjanjian     ini    telah diperpanjang    lagi              recently      been    extended    again    based
         berdasarkan Perubahan atas Perjanjian Fasilitas               on      Amendment         to   Credit     Facility
         Kredit No. 124/AMEND/VIII/2020 tanggal                        Agreement No. 124/AMEND/VIII/2020 dated
         25 Agustus 2020, sampai dengan tanggal                        August 25, 2020, until October 15, 2020, and this
         15 Oktober 2020 dan pinjaman ini sudah                        loan has been extended.
         diperpanjang.

         Berdasarkan surat No. MKT/EXT/063/III/2022                    Based on letter No. MKT/EXT/ 063/III/2022 dated
         tanggal   30    Maret  2022,     Perusahaan                   March 30, 2022, the Company obtained
         memperoleh Perpanjangan fasilitas kredit dari                 extention credit facility from CTBC in the form of
         CTBC berupa kredit modal kerja sebesar                        working     capital       loan    amounted      to
         Rp285.000.000.000 dengan jangka waktu jatuh                   Rp285,000,000,000, with due date June 30,
         tempo sampai dengan tanggal 30 Juni 2023                      2023, with an interest rate of JIBOR+4% per
         dengan suku bunga JIBOR+4% per tahun atau                     annum with minimum rate of 10%.
         minimal 10% per tahun.

         Fasilitas pinjaman ini dijamin oleh piutang usaha             This loan facility is colaterallized by accounts
         PT Waskita Karya (Persero) Tbk untuk proyek                   receivable from PT Waskita Karya (Persero) Tbk
         Pemerintah minimal 125% dari pinjaman yang                    for a Government project for minimum of 125%
         beredar saat ini yang sudah diikat secara fidusia.            of current outstanding loan bound under by
                                                                       fiduciary.

         Pembatasan terhadap tindakan:                                 Negative covenants or restrictions:

         1.   Mengubah kegiatan usaha sebagaimana                      1. Changing the business activities as stated in
              tercantum dalam anggaran dasar yang                         the Company’s articles of association that
                                                                          could reduce the ability to pay off the credit

                                                          92
Page 96
                                                                          The original financial statements included herein are in
                                                                                                        the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                               PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                       NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022             JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                          30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                             ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                            (UNAUDITED)

            dapat mengurangi kemampuan melunasi                         facility.
            fasilitas kredit.

       2.   Menjual atau mengalihkan seluruh aset                 2.    Sell or transfer all of assets of the Company
            Perusahaan dalam satu transaksi atau                        in a single transaction or in multiple
            dalam beberapa transaksi, kecuali:                          transactions, except:

            •    Menjual atau mentransfer aset dibawah                   •   Selling or transferring assets under
                 ketentuan arm’s length dan dengan                           arrangement that are at arm’s length and
                 tujuan melakukan kegiatan usaha;                            in order to run the daily business
                                                                             activities;
            •    Menjual atau mentransfer aset sebagai                   •   Selling or transferring assets as a
                 pengganti atau diganti dengan aset lain                     replacement or to be replaced with
                 yang sebanding atau lebih baik menurut                      another comparable assets or better in
                 jenis, sifat, kualitas;                                     type, nature, quality;
            •    Menjual atau mengalihkan aset untuk                     •   Selling or transferring assets for the
                 keperluan reorganisasi Pemerintah                           purpose of Government reorganization
                 Republik Indonesia selama penjualan                         of the Republic of Indonesia as long as
                 aset tidak memiliki hasil material;                         the sale of assets did not have a material
                                                                             result;
            •    Menjual atau mentransfer aset yang                      •   Selling or transferring assets that are not
                 tidak berguna atau tidak digunakan                          useful or are not used anymore with the
                 dengan persyaratan arm’s length; dan                        requirements of arm’s length; and
            •    Penjualan pengalihan aset per tahun                     •   Selling or transferring of assets per year
                 melebihi Rp500.000.000.000.                                 exceeding of Rp500,000,000,000.

       3.   Mengubah operasional bisnis saat ini yang              3.    Changing the operation of current business
            dapat menyebabkan hasil material kecuali                     that may cause material impact unless
            diwajibkan oleh hukum yang berlaku;                          required by appllicable law;

       4.   Penggabungan, pemisahan, likuidasi atau                4.    Merging, business combination, separation,
            rekonstruksi     Perusahaan     kecuali                      liquidation or corporate reorganization
            persyaratan sebagai berikut:                                 except the following requirements:

            •   Reorganisasi dapat dilakukan oleh                        •   Reorganization can be done by the
                Pemerintan Republik Indonesia selama                         Government of the Republic of Indonesia
                tidak memiliki dampak yang material;                         as long as the impact is not material;
            •   Tindakan Perusahaan dengan anggota                       •   The corporate actions with other
                lain dalam kelompok dengan ketentuan                         members in the Company with the
                mengikuti persyaratan;                                       provision following the requirements;
            •   Perusahaan akan bertahan sebagai                         •   The Company will survive as legal entity
                badan hukum dan akan memiliki status                         and will have the legal status after the
                hukum setelah tindakan korporasi; dan                        corporate action; and
            •   Pemisahan dimana Perusahaan menjadi                      •   Separation wherein the Company
                pemegang saham terbesar.                                     becomes the major shareholder.

       5.   Perubahan Anggaran Dasar yang dapat                   5.    Changes in the Articles of Association that
            menimbulkan akibat material;                                can lead to material impact;

       6.   Mengikat dirinya sendiri sebagai jaminan              6.    Bind itself as a collateral against the other
            terhadap pihak lain dan/ atau menjamin                      party and/ or pledging the Company’s assets
            kekayaan Perusahaan kepada pihak lain,                      to other parties, except those that are already
            kecuali yang sudah ada;                                     existing;

       7.   Usulkan    berkas   kebangkrutan atau                 7.    Proposing    to   file   bankruptcy     or
            penundaan pembayaran utang kepada                           postponement of debt payment to authorized
            pihak yang berwenang; dan                                   parties; and

       8.   Melunasi   utang    kepada      pemegang              8.    Repay the debt to shareholders/ limited
            saham/utang Perusahaan terbatas sebelum                     Company’s debt before the bank repays the
            bank melunasi utangnya terlebih dahulu.                     debt in advance.

                                                       93
Page 97
                                                                          The original financial statements included herein are in
                                                                                                        the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                               PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                       NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022             JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                          30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                             ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                            (UNAUDITED)

         Pada tanggal 30 Juni 2023, 31 Desember, 2022               As of June 30, 2023, December 31, 2022 and
         dan 30 Juni 2022, saldo pinjaman bank jangka               June 30, 2022, the balance of long-term loan of
         panjang Perusahaan kepada PT Bank CTBC                     the Company to PT Bank CTBC Indonesia
         Indonesia       masing-masing        sebesar               amounted                   Rp325,656,250,000,
         Rp325.656.250.000, Rp325.181.250.004 dan                   Rp325,181,250,004 and Rp318,768,750,004,
         Rp318.768.750.004.                                         respectively.

         Berdasarkan hasil putusan PKPU, Pinjaman                   Based on PKPU results, CTBC loans with
         CTBC      dengan     nilai    tercatat  sebesar            carrying amount of Rp285,000,000,000 and
         Rp285.000.000.000 dan utang bunga sebesar                  accrued interest of Rp40,656,250,000 were
         Rp40.656.250.000      direstrukturisasi sebagai            restructured as long-term bank loan (Note 43).
         pinjaman bank jangka Panjang (Catatan 43).                 The difference of Rp206,729,335,254 between
         Selisih sebesar Rp206.729.335.254 antara                   the fair value of the new loan amounting to
         nilai    wajar    pinjaman       baru   sebesar            Rp118,926,914,746 (including accrued interest)
         Rp118.926.914.746 (termasuk utang bunga)                   and the carrying amount of the old loan (including
         dengan nilai tercatat pinjaman lama (termasuk              accrued interest) was recognized as gain on
         utang bunga) diakui sebagai keuntungan atas                modification of debt under “other income – net” in
         modifikasi utang pada “pendapatan lain-lain –              profit or loss (Note 32).
         bersih” dalam laba rugi (Catatan 32).

         Pinjaman CTBC akan jatuh tempo pada tahun ke               CTBC loans will be due on the 17th year from
         17 sejak Tanggal Efektif.                                  Effective Date.

         Amortisasi diskonto untuk tahun yang berakhir              Amortization of discount for the year ended June
         pada 30 Juni 2023 dan 31 Desember 2022                     30, 2023, and December 31, 2022, amounted to
         masing-masing sebesar Rp4.628.127.634 dan                  Rp4,628,127,634       dan        Rp1,512,725,721
         Rp1.512.725.721, yang diakui sebagai bagian                respectively, which is recognized as part of
         dari beban keuangan pada laporan laba rugi dan             finance charges in the statement of profit or loss
         penghasilan komprehensif lain.                             and other comprehensive income.

    7.   PT Bank DKI                                           7.   PT Bank DKI

         Berdasarkan Surat No. 936/SPPK/910/VI/2020                 Based on Letter No. 936/SPPK/910/VI/2020
         tanggal 2 Juni 2020 mengenai Surat                         dated June 2, 2020, regarding Credit Approval
         Pemberitahuan Persetujuan Kredit (SPPK), telah             Notification Letter, it has been approved to
         disetujui penambahan limit fasilitas KMK                   increase the KMK Fixed Term Loan facility limit
         pinjaman     Tetap     Berjangka     menjadi               to Rp700,000,000,000 and Sublimit Non-Cash
         Rp700.000.000.000 dan Sublimit Non-Cash                    Loan amounting to Rp300,000,000,000. The
         Loan sebesar Rp300.000.000.000. Jangka                     loan period is until June 15, 2021. The interest
         waktu pinjaman sampai dengan 15 Juni 2021.                 rate is at 9.50% per annum.
         Suku bunga sebesar 9,50% per tahun.

         Berdasarkan Akta Adendum VI Perjanjian Kredit              Based on the Deed of Addendum VI of the
         Modal Kerja Sublimit Fasilitas Non Cash Loan               Working Capital Credit Agreement for the
         PT Waskita Beton Precast Tbk No.54 tanggal                 Sublimit of the Non-Cash Loan Facility of
         31 Maret 2022, Perusahaan mendapatkan                      PT Waskita Beton Precast Tbk No.54 dated
         fasilitas KMK restrukturisasi I sebesar                    March 31, 2022, the Company received
         Rp684.000.000.000 dan KMK restrukturisasi II               a    KMK     restructuring    I    facility   of
         sebesar Rp14.988.751.911. Jangka waktu                     Rp684,000,000,000 and a restructuring KMK II of
         pinjaman sampai dengan 31 Oktober 2022. Suku               Rp14,988,751,911. The loan period is until
         bunga sebesar 9,50% per tahun.                             October 31, 2022. The interest rate is at 9.50%
                                                                    per annum.

         Pembatasan:                                                Negative Covenant:

         1. Mengalihkan agunan yang sudah dijaminkan                 1.   Transferring the right to collateral that has
            ke Bank DKI kepada pihak lain.                                been pledged to Bank DKI to another party.
         2. Mengikatkan diri sebagai penjamin hutang                 2.   Binding themselves as guarantor of debt or
            atau     menjaminkan      harta   kekayaan                    pledging the Company’s assets that have
            Perusahaan yang sudah dijaminkan ke Bank                      been pledged to Bank DKI to other parties.
            DKI kepada pihak lain.
         3. Mengalihkan/menyerahkan kepada pihak                     3.   Transferring / surrendering to other parties,
            lain, sebagian atau seluruhnya atas hak dan                   in part or in whole for rights and obligations

                                                       94
Page 98
                                                                       The original financial statements included herein are in
                                                                                                     the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                              PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                      NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022            JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                         30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                            ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                           (UNAUDITED)

          kewajiban yang timbul berkaitan dengan                      arising in connection with Debtor credit
          fasilitas kredit Debitur di Bank DKI.                       facilities at Bank DKI.

       Fasilitas pinjaman ini dijamin dengan piutang             This loan facility is colaterallized by accounts
       usaha atas proyek Pemerintah Republik                     receivable from Government projects of the
       Indonesia dengan nilai sebesar minimal                    Republic of Indonesia with a minimum value of
       Rp750.000.000.000.                                        Rp750,000,000,000.

       Berdasarkan Memori Kasasi terhadap Putusan                Based on the Memorandum of Cassation against
       Pengesahan       Perdamaian       (Homologasi)            the       Commercial       Court       Ratification
       Pengadilan Niaga pada Pengadilan Negeri                   of    Peace     (Homologation)     Decision       at
       Jakarta      Pusat     No.       497/PDT.SUS-             the     Central     Jakarta     District     Court
       PKPU/2021/PN.NIAGA/JKT.PST antara PT Bank                 No.        497/PDT.SUS-PKPU/2021/PN.NIAGA/
       DKI       (Pemohon       Kasasi)      melawan             JKT.PST between PT Bank DKI (the Petitioner for
       PT Waskita Beton Precast Tbk (dalam PKPU)                 Cassation) and PT Waskita Beton Precast Tbk
       (Termohon Kasasi) No 177/BDKI-WSBP/DS-                    (in PKPU) (Respondent for Cassation) No.
       WS/VII/2022 tanggal 5 Juli 2022, PT Bank DKI              177/BDKI-WSBP/DS-WS/VII/2022 dated July 5,
       sebagai pemohon kasasi menyampaikan memori                2022, PT Bank DKI as the applicant for cassation
       kasasi ke Mahkamah Agung RI melalui                       submitted a memorandum of cassation to the
       kepaniteraan Pengadilan Niaga pada Pengadilan             Supreme Court of the Republic of Indonesia
       Negeri Jakarta Pusat yaitu Permohonan                     through the clerk of the Commercial Court at the
       Pembatalan Putusan Pengesahan Perdamaian                  Central Jakarta District Court, namely the
       (Homologasi) PT Waskita Beton Precast Tbk                 Application for Cancellation Decision on
       (dalam PKPU).                                             Ratification of Peace (Homologation) of PT
                                                                 Waskita Beton Precast Tbk (in PKPU).

       Berdasarkan surat dari Pengadilan Negeri                  Based on a letter from the District Court Central
       Jakarta Pusat Kelas I A Khusus No.                        Jakarta      Class     I     A      Special    No.
       W10.U1/81/HT.02/I/2022.03.Hry      tanggal   5            W10.U1/81/HT.02/I/2022.03.Hry dated January
       Januari 2023 perihal pemberitahuan dan                    5, 2023, regarding the notification and submission
       penyampaian salinan putusan Mahkamah Agung                of a copy of the decision of the Supreme Court of
       RI    No.   1445/K/Pdt.Sus-Pailit/2022.Jo.497/            the Republic of Indonesia No.1445/K/Pdt. Sus
       Pdt.Sus PKPU/2021/PN/ Niaga.Jkt.Pst. Bahwa                Pailit/2022.Jo.497/Pdt.Sus/PKPU/2021/PN
       Mahkamah Agung RI memutuskan menolak                      Niaga. Jkt. Pst. Where the Supreme Court of the
       permohonan kasasi dari Para Pemohon Kasasi                Republic of Indonesia decided to reject the
       PT Bank DKI.                                              cassation petition from the Cassation Appellant
                                                                 PT Bank DKI.

       Berdasarkan surat dari PT Bank DKI No                     Based on a letter from PT Bank DKI No
       02/DIR/KKM/I/2023 tanggal 31 Januari 2023                 02/DIR/KKM/I/2023 dated January 31, 2023
       perihal    Penyampaian         Tenggat    Waktu           regarding Submission of the Deadline for
       Pelaksanaan Restrukturisasi Kredit Diluar                 Implementation of Credit Restructuring Outside
       Perjanjian Perdamaian setelah PKPU Berakhir,              the Peace Agreement after PKPU Ends, where
       dimana PT Bank DKI menghormati proses                     PT Bank DKI respects the internal processes
       internal yang dilakukan Perusahaan dalam                  carried out by the Company in implementing
       pelaksanaan      restrukturisasi   kredit diluar          credit restructuring outside the Settlement
       Perjanjian Perdamaian, namun demikian                     Agreement, however, due to the protracted nature
       sehubungan dengan telah berlarut-larutnya                 of this process, we hope that the Company will be
       proses ini maka kami berharap Perusahaan                  able to sign the Credit Agreement Addendum with
       dapat melakukan penandatanganan Adendum                   PT Bank DKI no later than February 17, 2023. If
       Perjanjian Kredit dengan PT Bank DKI selambat-            by the specified deadline the Company cannot
       lambatnya tanggal 17 Februari 2023. Apabila               sign the Credit Agreement addendum, then the
       sampai dengan tenggat waktu yang telah                    Company's credit facility will experience a
       ditetapkan Perusahaan tidak dapat melakukan               decrease in credit quality where this will have an
       penandatanganan adendum Perjanjian Kredit,                impact on the Company's parent business credit
       maka atas fasilitas kredit Perusahaan akan                facility at Bank DKI in accordance with the credit
       mengalami penurunan kualitas kredit dimana hal            provisions regarding one obligor.
       tersebut akan berdampak pada fasilitas kredit
       induk usaha Perusahaan yang ada di Bank DKI
       sesuai dengan ketentuan perkreditan mengenai
       one obligor.


                                                      95
Page 99
                                                                           The original financial statements included herein are in
                                                                                                         the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                  PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                          NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                             30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                               (UNAUDITED)

       Berdasarkan Surat No 196/WBP/DIR/2023                         Based on Letter No 196/WBP/DIR/2023 dated
       tanggal 8 Februari 2023 perihal tanggapan atas                February 8, 2023 regarding the response to PT
       surat PT Bank DKI No 02/DIR/KKM/I/2023                        Bank DKI's letter No 02/DIR/KKM/I/2023 dated
       tanggal 31 Januari 2023, secara prinsip                       January 31, 2023, in principle the Company is
       Perusahaan berkomitmen untuk menyelesaikan                    committed to fulfilling our obligations to PT Bank
       kewajiban yang kami miliki kepada PT Bank DKI                 DKI as well as being open to Bank DKI's
       serta terbuka atas usulan Bank DKI dengan tetap               proposals while still paying attention to
       memperhatikan aspek kepatuhan serta risiko-                   compliance aspects and legal risks that may arise
       risiko hukum yang dapat timbul kepada                         to the Company in connection with the
       Perusahaan sehubungan dengan pelaksanaan                      implementation of Bank DKI's proposals,
       usulan Bank DKI, terutaman atas potensi risiko                especially regarding the potential risk of lawsuits
       gugatan pembatalan Perjanjian Perdamaian                      canceling the Settlement Agreement which has
       yang berdampak merugikan seluruh kreditur                     an adverse impact on all creditors including Bank
       termasuk      Bank     DKI    dan       Perusahaan.           DKI and the Company. The Company believes
       Perusahaan       yakin    bahwa        pertimbangan           that the Company's considerations are in line with
       Perusahaan sejalan dengan Pendapat Hukum                      the Legal Opinion of Bank DKI. In order to obtain
       Bank DKI. Guna mendapatkan kepastian bahwa                    certainty that the implementation of credit
       pelaksanaan restrukturisasi kredit di kemudian                restructuring in the future does not pose risks as
       hari tidak menimbulkan risiko sebagaimana                     stated in the Legal Opinion of Bank DKI and other
       disampaikan dalam Pendapat Hukum Bank DKI                     legal risks due to negligence in carrying out the
       dan risiko hukum lainnya akibat kelalaian                     Settlement Agreement which has permanent
       melaksanakan Perjanjian Perdamaian yang                       legal force, then the Company believes that the
       telah berkekuatan hukum tetap, maka                           proposal to change the Bank DKI Restructuring
       Perusahaan beranggapan bahwa usulan                           Tranche which was originally Tranche B and
       perubahan Tranche Restrukturisasi Bank DKI                    Tranche C to Trance A can be accommodated by
       yang semula adalah Tranche B dan Tranche C                    the Company by first making a request to all
       menjadi Trance A dapat diakomodir Perusahaan                  creditors for Bank DKI's plan with reference to
       dengan terlebih dahulu melakukan permohonan                   article 5.7 of the Settlement Agreement, namely
       kepada seluruh kreditur atas rencana Bank DKI                 "changes to the Settlement Agreement can only
       dengan mengacu kepada pasal 5.7 Perjanjian                    amended or amended based on a proposal or
       Perdamaian yaitu "perubahan Perjanjian                        request from the Company, provided that it is
       Perdamaian hanya dapat diubah atau                            approved by 50% of the total value of the
       diamandemen        berdasarkan        usulan    atau          Creditor's invoice that submits the invoice in the
       permintaan dari Perusahaan, dengan catatan                    PKPU process."
       disetujui oleh 50% dari total nilai tagihan Kreditur
       yang mengajukan tagihan dalam proses PKPU.”

       Berdasarkan Nota Kesepahaman antara PT                        Based on the Memorandum of Understanding
       Bank DKI dengan Perusahaan, dengan Bank                       between PT Bank DKI and the Company with
       DKI No. 09/MOU/DIR/II/2023 dan Perusahaan                     Bank DKI No. 09/MOU/DIR/II/2023 and No.
       dengan No. 001/MOU/WBP/DIR/2023 tanggal                       WSBP 001/MOU/WBP/DIR/2023 dated February
       21 Februari 2023, dengan ketentuan sebagai                    21, 2023, with the following conditions:
       berikut:

        1. Tujuan Nota Kesepahaman adalah untuk                       1. The purpose of the Memorandum of
           terwujudnya pelaksanaan restrukturisasi                       Understanding       is   to    realize     the
           fasilitas kredit modal kerja Perusahaan                       implementation of the restructuring of the
           sesuai Tranche A Perjanjian Perdamaian,                       Company’s working capital credit facility in
           setelah      dilaksanakannya   Adendum                        accordance with Tranche A of the Settlement
           Perjanjian Perdamaian.                                        Agreement, following the implementation of
                                                                         the Addendum to the Settlement Agreement.
        2. Setelah      ditandatanganinya   Nota                      2. After    signing    the   Memorandum         of
           Kesepahaman dan dipenuhi Persyaratan                          Understanding        and     fulfilling    the
           Adendum Perjanjian Perdamaian, maka                           Requirements for the Addendum to the
           Perusahaan akan melanjutkan pembuatan                         Peace Agreement, the the Company will
           dan penandatanganan Adendum Perjanjian                        continue to draw up and sign the Addendum
           Perdamaian.                                                   to the Peace Agreement.
        3. WSBP      akan      mengirimkan  surat                     3. WSBP will send a written notification letter to
           pemberitahuan tertulis kepada seluruh                         all WSBP creditors (Written Notification
           kreditur WSBP (Surat Pemberitahuan                            Letter) no later than 14 calendar days from
           Tertulis) selambat-lambatnya 14 hari                          the date this Memorandum of Understanding
                                                                         was signed.

                                                          96
Page 100
                                                                        The original financial statements included herein are in
                                                                                                      the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                               PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                       NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022             JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                          30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                             ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                            (UNAUDITED)

             kalender sejak tanggal ditandatanganinya
             Nota Kesepahaman ini.
        4.   Setelah diterimanya tanggapan atas Surat              4. After receiving a response to the Written
             Pemberitahuan Tertulis dari para kreditur                Notification Letter from the creditors of WSBP
             WSBP (Tanggapan Kreditur), maka                          (Creditors Response), the Company is
             Perusahaan        wajib     menyampaikan                 required to submit the creditor's response to
             tanggapan kreditur kepada bank selambat-                 the bank no later than 5 working days from
             lambatnya 5 hari kerja sejak tanggal                     the date of receipt of the Creditor's Response.
             diterimanya Tanggapan Kreditur.
        5.   Perusahaan       dan/atau    Bank     akan            5. The Company and/or the Bank will make their
             melakukan      upaya    terbaiknya   untuk               best efforts so that the signing of the
             pelaksanaan penandatanganan Adendum                      Addendum to the Peace Agreement can be
             Perjanjian Perdamaian dapat terpenuhi                    fulfilled
        6.   Nota kesepahaman berlaku dalam kurun                  6. This Memorandum of Understanding is valid
             waktu 60 hari kalender sejak tanggal                     within 60 calendar days from the date this
             ditandatanganinya Nota Kesepahaman ini                   Memorandum of Understanding was signed
             oleh para pihak dan dapat dilakukan                      by the parties and can be extended based on
             perpanjangan berdasarkan kesepakatan                     the agreement of the parties to be Tranche A.
             para pihak menjadi Tranch A.
        7.   Bank DKI dan WSBP sepakat untuk tunduk                7. Bank DKI and WSBP agree to comply with
             pada ketentuan Pasal 5.7 Perjanjian                      the provisions of Article 5.7 of the Settlement
             Perdamaian      yang    mengatur    bahwa                Agreement which stipulates that the
             mekanisme         addendum       Perjanjian              mechanism for the Addendum to the
             Perdamaian harus dilakukan dengan                        Settlement Agreement must be carried out by
             mendapatkan persetujuan dari 50% dari                    obtaining approval from 50% of the total value
             total nilai tagihan kreditur WSBP yang                   of the WSBP creditor's bill that submits a bill
             mengajukan tagihan dalam proses PKPU.                    in the PKPU process.

       Pada tanggal 30 Juni 2023, 31 Desember 2022                As at June 30, 2023, December 31, 2022 and
       dan 30 Juni 2022, saldo pinjaman bank jangka               June 30, 2022, the balance of short-term loan of
       pendek Perusahaan kepada PT Bank DKI                       the Company to PT Bank DKI amounted to
       sebesar                   Rp671.127.052.204,               Rp671,127,052,204, Rp671,127,052,204 and
       Rp671.127.052.204 dan Rp661.614.800.319.                   Rp661,614,800,319. Meanwhile, the balance of
       Sedangkan saldo pinjaman bank jangka panjang               long-term bank loans as of June 30, 2023 and
       per 30 Juni 2023 dan 31 Desember 2022                      December 31, 2022 was Rp118,434,185,683
       masing-masing sebesar Rp118.434.185.683,                   each, and June 30, 2022 is Rp116,755,552,997.
       dan 30 Juni 2022 sebesar Rp116.755.552.997.

       Berdasarkan hasil PKPU, pinjaman Bank DKI                   Based on PKPU results, Bank DKI loans with a
       dengan nilai tercatat Rp118.434.185.683                     carrying    amount      of    Rp118,434,185,683
       merupakan 15% dari total nilai tercatat utang               constitute 15% of the total carrying value of old
       bank     lama    sebesar     Rp698.988.751.911              bank loans of Rp698,988,751,911 plus interest
       ditambah        utang       bunga       sebesar             payable of Rp90,572,485,976 which was
       Rp90.572.485.976        yang    direstrukturisasi           restructured into long-term bank loans (Note 43).
       menjadi pinjaman bank jangka panjang (Catatan               The remaining Rp671,127,052,204 is for short-
       43). Sisanya sebesar Rp671.127.052.204                      term     bank    loans.    The      difference    of
       sebagai utang bank jangka pendek. Selisih                   Rp47,192,479,401 between the fair value of new
       sebesar Rp47.192.479.401 antara nilai wajar                 long-term bank loans of Rp71,241,706,282 and
       utang bank jangka panjang baru sebesar                      the carrying value of old bank loans was
       Rp71.241.706.282 dan nilai tercatat utang bank              recognized as a gain on debt modification in
       lama diakui sebagai keuntungan atas modifikasi              “other income – net” in profit or loss (Note 32).
       utang pada “pendapatan lain-lain – bersih” dalam
       laba rugi (Catatan 32).

       Amortisasi diskonto untuk tahun yang berakhir               Amortization of discount for the year ended
       pada 30 Juni 2023 dan 31 Desember 2022                      December 31, 2022, and December 31, 2022,
       masing-masing sebesar Rp5.521.332.871 dan                   amounted      to     Rp5,521,332,871     and
       Rp1.807.310.269, yang diakui sebagai bagian                 Rp1,807,310,269,    respectively, which    is
       dari beban keuangan pada laporan laba rugi dan              recognized as part of finance charges in the
       penghasilan komprehensif lain.                              statement of profit or loss and other
                                                                   comprehensive income.


                                                       97
Page 101
                                                                             The original financial statements included herein are in
                                                                                                           the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                  PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                          NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                             30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                               (UNAUDITED)

   8.   PT Bank BCA Syariah                                       8.   PT Bank BCA Syariah

        Berdasarkan      Pemberitahuan     Pemberian                   Based on the Notification of Provision of
        Fasilitas Pembiayaan No. 056/ADP/2018,                         Financing Facilities No. 056/ADP/2018, dated
        tanggal 6 Juni 2018 dengan PT Bank BCA                         June 6, 2018 with PT Bank BCA Syariah, the
        Syariah, Perusahaan memperoleh fasilitas                       Company obtained a credit facility from PT Bank
        kredit dari PT Bank BCA Syariah berupa PMK                     BCA Syariah in the form of Musharaka PMK
        Musyarakah (Revolving), yang peruntukannya                     (Revolving), the designation of which was as
        adalah     sebagai   modal    kerja   Proyek                   working capital Infrastructure development
        pembangunan infrastruktur dan tagihan                          projects and special sales receivables (trade
        penjualan (piutang usaha) khusus kepada                        receivables) to PT Waskita Karya (Persero) Tbk
        PT Waskita Karya (Persero) Tbk dan entitas                     and       subsidiaries      amounting        to
        anak sebesar Rp100.000.000.000, dengan                         Rp100,000,000,000, with a loan period of 12
        jangka waktu pinjaman selama 12 bulan.                         months. The term of this loan has been
        Jangka waktu pinjaman ini telah diperpanjang                   extended based on the Notification of Extension
        berdasarkan Pemberitahuan Perpanjangan                         of Financing Facilities No. 184/ADP/2020 to
        Fasilitas Pembiayaan No. 184/ADP/2020                          June 6, 2021.
        menjadi tanggal 6 Juni 2021.

        Berdasarkan     surat    No.     0285/PRBH-                    Based on letter No. 0285/PRBH-BCAS/III/2022
        BCAS/III/2022 tanggal 23 Maret 2022 terkait                    dated March 23, 2022, regarding the
        Perubahan Akad Pembiayaan Musyarakah,                          Amendment          to    Musyarakah     Financing
        WBP memperoleh fasilitas kredit dari PT Bank                   Agreement, WBP obtained a credit facility from
        BCA Syariah berupa PMK Musyarakah                              PT Bank BCA Syariah in the form of PMK
        (Revolving),   sebesar   Rp100.000.000.000,                    Musyarakah         (Revolving),    amounting    to
        dengan jangka waktu pinjaman sampai dengan                     Rp100,000,000,000, with a loan term of up to
        tanggal 6 Juni 2022. Sampai dengan tanggal                     June 6, 2022. As at the reporting date, this loan
        pelaporan, pinjaman ini masih dalam proses                     is still in the process of being renewed.
        perpanjangan.

        Fasilitas ini dijaminkan dengan Piutang Usaha                  This   loan   facility is  secured                      with
        senilai Rp120.000.000.000.                                     accounts    receivable    amounting                       to
                                                                       Rp120,000,000,000.

        Pembatasan:                                                    Negative Covenant:

        Perusahaan sebelum atau sesudah pinjaman                       The Company before or after the facility was
        diberikan oleh bank, juga mempunyai utang                      provided by the bank, obtains loan from third
        kepada pihak ketiga dan hal yang demikian tidak                parties without informing the bank.
        diberitahukan kepada bank.

        Pada tanggal 30 Juni 2023, 31 Desember 2022                    As of June 30, 2023, December 31, 2022 and
        and 30 Juni 2022, saldo pinjaman bank jangka                   June 30, 2022, the balance of long-term loan of
        panjang Perusahaan kepada PT Bank BCA                          the Company to PT Bank BCA Syariah
        Syariah        masing-masing        sebesar                    amounted         to       Rp111,019,443,140,
        Rp111.019.443.140, Rp109.870.823.344 dan                       Rp109,870,823,344 and Rp107,845,823,344,
        Rp107.845.823.344.                                             respectively.

        Berdasarkan hasil putusan PKPU, Pinjaman                       Based on PKPU results, PT Bank BCA Syariah
        PT Bank BCA Syariah dengan nilai tercatat                      loans      with      carrying     amount          of
        sebesar Rp100.000.000.000 dan utang bunga                      Rp100,000,000,000 and accrued interest of
        sebesar Rp11.019.443.140 direstrukturisasi                     Rp11,019,443,140 were restructured as long-
        sebagai pinjaman bank jangka Panjang                           term bank loan (Note 43). The difference of
        (Catatan      43).        Selisih      sebesar                 Rp70,476,079,242 between the fair value of the
        Rp70.476.079.242 antara nilai wajar pinjaman                   new loan amounting to Rp40,543,363,898
        baru sebesar Rp40.543.363.898 (termasuk                        (including accrued interest) and the carrying
        utang bunga) dengan nilai tercatat pinjaman                    amount of the old loan (including accrued
        lama (termasuk utang bunga) diakui sebagai                     interest) was recognized as gain on modification
        keuntungan atas modifikasi utang pada                          of debt under “other income – net” in profit or loss
        “pendapatan lain-lain – bersih” dalam laba rugi                (Note 32).
        (Catatan 32).


                                                          98
Page 102
                                                                            The original financial statements included herein are in
                                                                                                          the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                 PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                         NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022               JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                            30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                               ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                              (UNAUDITED)

        Pinjaman PT Bank BCA Syariah akan jatuh                       PT Bank BCA Syariah loans will be due on the
        tempo pada tahun ke 17 sejak Tanggal Efektif.                 17th year from Effective Date.
        Amortisasi diskonto untuk tahun yang berakhir                 Amortization of discount for the year ended June
        pada 30 Juni 2023 dan 31 Desember 2022,                       30, 2023, and December 31, 2022, amounted to
        masing-masing sebesar Rp1.577.774.579 dan                     Rp1,577,774,579         and       Rp511,113,173,
        Rp511.113.173, yang diakui sebagai bagian                     respectively, which is recognized as part of
        dari beban keuangan pada laporan laba rugi dan                finance charges in the statement of profit or loss
        penghasilan komprehensif lain.                                and other comprehensive income.

   9.   PT Bank Permata Tbk                                      9.   PT Bank Permata Tbk

        Berdasarkan       Perjanjian       Pembiayaan                 According to the Agreement of Finance Method
        Musyarakah Mutanaqisah No. 18 tanggal                         of Musyarakah Mutanaqisah No. 18 dated
        26 Juli 2018, Perusahaan memperoleh                           July 26, 2018, the Company obtained Revolving
        Revolving Financing iB (Baru) sebesar                         Finance      iB      (New)       amounting        to
        Rp300.000.000.000, dengan jangka waktu                        Rp300,000,000,000, with loan term of 12 months
        12 bulan sejak ditandatangani, dengan bagi                    since signing with the pricing equivalent to 9.25%
        hasil setara 9,25% per tahun. Perjanjian ini                  per annum. This agreement has been extended
        telah     diperpanjang      sesuai    dengan                  in      accordance        with      the       Letter
        Surat No. 215/BP/LOO/CRC-JKT/WB/VII/2020                      No. 215/BP/LOO/CRC-JKT/WB/VII/2020 until
        sampai dengan tanggal 26 Juli 2021.                           July 26, 2021.

        Pembatasan terhadap tindakan:                                 Restriction of covenant:

        1.   Bertindak sebagai penjamin terhadap                      1.   Binds itself as surety against the other party,
             hutang pihak lain, kecuali hutang dagang                      except in order to perform daily business
             yang dibuat dalam rangka menjalankan                          activites;
             usaha sehari-hari;

        2.   Mengubah sifat dan kegiatan usaha yang                   2.   Change the business activities or run the
             sedang     dijalankan  atau   melakukan                       new business opening other than an
             kegiatan usaha diluar kegiatan usahanya                       existing business;
             sehari-hari;

        3.   Menjaminkan, mengalihkan, menyewakan,                    3.   Mortgaging, transferring, leasing, submitting
             menyerahkan kepada pihak lain atas                            collateral to the other party;
             barang jaminan;

        4.   Memberikan pinjaman maupun fasilitas                     4.   Provide loans or other financial facility to or
             keuangan kepada atau dari pihak lain                          from the other party except for short-term
             kecuali dalam jangka pendek dan dalam                         and in order to drive the daily business
             rangka menunjang kegiatan usahanya                            activities;
             sehari-hari;

        5.   Melakukan penyertaan yang berpengaruh                    5.   Make new investments that could affect to
             terhadap kemampuan membayar;                                  the payment quality;

        6.   Melakukan tindakan lainnya yang dapat                    6.   Taking actions that            could      affect    the
             menyebabkan        atau    terganggunya                       obligation to the bank;
             kewajiban yang terhutang kepada bank;

        7.   Melakukan pembubaran, penggabungan                       7.   Liquidation  of   corporate, business
             usaha dan/ atau peleburan dengan                              combination, and/ or merger with other
             Perusahaan      lain  atau    memperoleh                      company or obtain the part of other
             sebagian besar dari aset dari Perusahaan                      company’s assets or other business
             lain atau bentuk perubahan usaha lainnya;                     changes;

        8.   Mengubah      susunan     dan    jumlah                  8.   Change the form and quantities of
             kepemilikan pemegang saham tertutup                           the shareholder (except Stated Owned
             dan/ atau pemegang saham pengendali                           Enterprise),
             Perusahaan terbuka (kecuali BUMN),

        9.   Membayar atau menyatakan dapat dibayar                   9.   Pay or declare of dividends or distribute the
             suatu dividen atau pembagian keuntungan                       gain in any form of shares issued;
                                                         99
Page 103
                                                                     The original financial statements included herein are in
                                                                                                   the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                            PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                    NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022          JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                       30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                          ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                         (UNAUDITED)

             berupa apapun juga atas saham yang
             dikeluarkan;

       10. Membayar kembali tagihan atau piutang               10. Repay the bills or receivables that will be
           berupa apapun juga yang sekarang telah                  given now and/ or later from shareholders.
           dan/ atau dikemudian hari akan diberikan
           oleh pemegang saham.

         Berdasarkan       Perjanjian      Pembiayaan          Based      on    the     Financing      Agreement
         No. 451/BP/LOO/CRC-JKT/WB/VIII/2021 pada              No. 451/BP/LOO/CRC-JKT/WB/VIII/ 2021 dated
         tanggal 13 Agustus 2021, Perusahaan                   August 13, 2021, the Company obtained
         memperoleh fasilitas pembiayaan Omnibus               an      Omnibus       financing      facility  of
         sebesar Rp400.000.000.000 dengan jangka               Rp400,000,000,000 with a term of up to
         waktu sampai dengan tanggal 26 Juli 2022,             July 26, 2022, with the following sub-limits:
         dengan sub limit sebagai berikut:

        1.    LC/SKBDN/PIF/BG untuk pembelian                  1.   LC/SKBDN/PIF/BG for the purchase of raw
              bahan baku, peralatan-peralatan, dan                  materials, equipment, and sub-contractor
              pembayaran       sub-kontraktor  yang                 payments needed in connection with the
              dibutuhkan sehubungan dengan proyek                   Customer's project, for financing the
              Nasabah, untuk pembiayaan LC/SKBDN                    Customer's LC/SKBDN that is due, as well as
              Nasabah yang jatuh tempo, serta untuk                 to meet BG needs for the project obtained
              memenuhi kebutuhan BG atas proyek                     by    the    customer    amounting       to
              yang didapatkan nasabah sebesar                       Rp400,000,000,000 with an interest rate of
              Rp400.000.000.000 dengan suku bunga                   9.5% per annum and 10% per annum for PIF.
              sebesar 9,5% per tahun dan 10% per
              tahun untuk PIF.

        2.    Payable Services untuk membiayai                 2.   Payable Services to finance Non-LC/non-
              tagihan atau transaksi Non-LC/non-                    SKBDN invoices or transactions for trade in
              SKBDN atas perdagangan barang terkait                 goods related to projects undertaken by the
              dengan proyek-proyek yang dikerjakan                  customer      in     the     amount       of
              nasabah sebesar Rp400.000.000.000                     Rp400,000,000,000 with an interest rate of
              dengan suku bunga sebesar 10% per                     10% per annum.
              tahun.

        3.    Musyarakah Mutanaqisah (MMQ) atau                 3. Musyarakah Mutanaqisah (MMQ) or
              Revolving Financing iB merupakan                     Revolving Financing iB is financing for
              pembiayaan kebutuhan umum modal                      general working capital needs in connection
              kerja sehubungan dengan aktivitas                    with the customer's business activities of
              usaha        nasabah        sebesar                  Rp300,000,000,000 with an interest rate of
              Rp300.000.000.000 dengan suku bunga                  11% per annum.
              sebesar 11% per tahun.

        4.    Revolving Loan untuk pembiayaan                   4. Revolving Loan to finance general working
              kebutuhan    umum    modal     kerja                 capital needs in connection with the
              sehubungan dengan aktivitas usaha                    Customer's    business     activities   of
              Nasabah sebesar Rp100.000.000.000                    Rp100,000,000,000 with an interest rate of
              dengan suku bunga sebesar 10,5% per                  10.5% per annum.
              tahun.

        Penggunaan Limit dan Sub Limit secara                  The use of Limit and Sub-Limit as a whole may
        keseluruhan    tidak boleh    melebihi                 not exceed Rp400,000,000,000.
        Rp400.000.000.000.

        Pada tanggal 30 Juni 2023, 31 Desember 2022             As of June 30, 2023, December 31, 2022 and
        dan 30 Juni 2022, saldo pinjaman bank jangka            June 30, 2022, the balance of loan of the
        panjang Perusahaan kepada PT Bank                       Company to PT Bank Permata Tbk amounted
        Permata     Tbk    masing-masing    sebesar             to Rp459,997,319,257, Rp452,550,981,778
        Rp459.997.319.257, Rp452.550.981.778 dan                and Rp443,074,968,833, respectively.
        Rp443.074.968.833.

        Berdasarkan hasil putusan PKPU, Pinjaman                Based on PKPU results, PT Bank Permata Tbk
        PT Bank Permata Tbk dengan nilai tercatat               loans    with    carrying    amount     of
        sebesar Rp397.317.104.597 dan utang bunga               Rp397,317,104,597 and accrued interest of
                                                   100
Page 104
                                                                          The original financial statements included herein are in
                                                                                                        the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                               PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                       NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022             JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                          30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                             ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                            (UNAUDITED)

        sebesar Rp62.680.214.660 direstrukturisasi                   Rp62,680,214,660 were restructured as long-
        sebagai pinjaman bank jangka Panjang                         term bank loan (Note 43). The difference of
        (Catatan       43).       Selisih       sebesar              Rp292,010,179,533 between the fair value of
        Rp292.010.179.533       antara    nilai   wajar              the new loan amounting to Rp167,987,139,724
        pinjaman baru sebesar Rp167.987.139.724                      (including accrued interest) and the carrying
        (termasuk utang bunga) dengan nilai tercatat                 amount of the old loan (including accrued
        pinjaman lama (termasuk utang bunga) diakui                  interest) was recognized as gain on
        sebagai keuntungan atas modifikasi utang                     modification of debt under “other income – net”
        pada “pendapatan lain-lain – bersih” dalam                   in profit or loss (Note 32).
        laba rugi (Catatan 32).

        Pinjaman PT Bank Permata Tbk akan jatuh                      PT Bank Permata Tbk loans will be due on the
        tempo pada tahun ke 17 sejak Tanggal Efektif.                17th year from Effective Date.

        Amortisasi diskonto untuk tahun yang berakhir                Amortization of discount for the year ended
        pada 30 Juni 2023 dan 31 Desember 2022                       June 30, 2023 and December 31, 2022
        masing-masing sebesar Rp6.537.342.073 dan                    amounted      to    Rp6,537,342,073     and
        Rp2.105.242.877, yang diakui sebagai bagian                  Rp2,105,242,877, respectively, which is
        dari beban keuangan pada laporan laba rugi                   recognized as part of finance charges in the
        dan penghasilan komprehensif lain.                           statement of profit or loss and other
                                                                     comprehensive income.

   10. PT Bank Mandiri (Persero) Tbk                           10. PT Bank Mandiri (Persero) Tbk

        Berdasarkan Surat dari PT Bank Mandiri                     Based on a Letter from PT Bank Mandiri (Persero)
        (Persero) Tbk No 4.Ar.JPK/SME/SPPK/0076/                   Tbk No 4.Ar.JPK/SME/SPPK/0076/2023 dated
        2023 tanggal 6 Maret 2023 perihal Surat                    March 6, 2023 regarding the Letter of Offer for
        Penawaran Pemberian Kredit, telah ditentukan               Credit, it has been determined as follows:
        sebagai berikut:
        1. Tujuan Penggunaan                                       1. Purpose of Use
           Pengalihan hak tagih dalam rangka                         Transfer of billing rights in the context of
            pelaksanaan Perjanjian Perdamaian PT                     implementing the PT Waskita Beton Precast
            Waskita Beton Precast Tbk (WSBP) dari 26                 Tbk (WSBP) Settlement Agreement from 26
            Supplier/Sub Kontraktor kepada PT Bank                   Suppliers/Sub-Contractors to PT Bank Mandiri
            Mandiri atas invoice yang telah dibiayai                 for invoices that have been financed with the
            dengan     fasilitas Accepted       Invoice              Accepted Invoice Financing facility.
            Financing.
        2. Fitur dan Ketentuan                                     2. Features and Conditions
           Fitur dan ketentuan fasilitas kredit WSBP                 Features and conditions of the WSBP credit
            sesuai dengan Skema Tranche A:                           facility in accordance with the Tranche A
                                                                     Scheme:

            No                 Ketentuan/Terms                           Keterangan/Description
             1    Jenis Fasilitas/Facility Type              KMK Post Financing
             2    Jangka Waktu/Time Period                   20 September 2022 sd 20 September 2039
                                                             (17 Tahun sejak Tanggal Berlaku Perjanjian WSBP)/
                                                             17 Years from the Effective Date of the WSBP
                                                             Agreement
            3     Pokok/Principal                            Rp270.691.905.539
            4     Bunga     sebelum   Efektif Perjanjian     Jenis Bunga/Interest         Biaya         Bunga/
                  Perdamaian WSBP/Interest before the        Type                         Interest Expense
                  Effectiveness of the WSBP Settlement
                  Agreement
                                                             Bunga sd jatuh tempo           :            21.316.590.997
                                                             invoice yang dilaporkan
                                                             kepada pengurus PKPU
                                                             (10.5% p.a)/ Interest
                                                             until the due date of the
                                                             invoice reported to the
                                                             PKPU        management
                                                             (10.5% p.a)


                                                      101
Page 105
                                                                          The original financial statements included herein are in
                                                                                                        the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                               PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                       NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022             JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                          30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                             ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                            (UNAUDITED)

                                                             Bunga              setelah :             13.290.009.918
                                                             homologasi       sd     19
                                                             September 2022 10.5%
                                                             p.a)/     Interest    after
                                                             homologation          until
                                                             September 19, 2022
                                                             10.5% p.a)
                                                             Jumlah Bunga/Total :                     34.606.600.915
                                                             Interest
            5    Mekasnisme      Pembayaran      Bunga       Seluruh Bunga Tertunggak baik sebelum maupun
                 sebelum Eektif Perjanjian Perdamaian        pada saat proses PKPU berjalan akan ditangguhkan
                 WSBP/Mechanism of Interest Payment          (deferred) dan akan dibayarkan sesuai mekanisme
                 before the Effectiveness of the WSBP        Tranche A, termasuk bunga sejak putusan
                 Settlement Agreement                        pengesahan Perjanjian Perdamaian sapai dengan
                                                             putusan kasasi/ All outstanding interest both before
                                                             and during the PKPU process will be deferred and
                                                             will be paid according to the Tranche A mechanism,
                                                             including interest since the decision to ratify the
                                                             Settlement Agreement until the cassation decision.
            6    Bunga    setelah  efektif    Perjanjian     Berdasarkan Perjanjian Perdamaian WSBP, tingkat
                 Perdamaian WSBP/Interest after effective    suku bunga yang berlaku sesuai jangka waktu
                 WSBP Settlement Agreement                   pelaksanaan Perjanjian Perdamaian WSBP dengan
                                                             debitur atas nama WSBP sebagai berikut/ Based on
                                                             the WSBP Settlement Agreement, the interest rate
                                                             that applies according to the implementation period
                                                             of the WSBP Settlement Agreement with debtors on
                                                             behalf of WSBP is as follows:
                                                                    Tahun/Year                           %
                                                             Tahun ke 1 sd ke 9                2% pa
                                                             Tahun ke 10 sd ke 13              3% pa
                                                             Diatas tahun ke 13/               4% pa
                                                             Over 13th year
            7    Mekanisme pembayarn bunga setelah            • Pembayaran bunga akan dilakukan pada tanggal
                 efektif Perjanjian Perdamaian WSBP/              25yang jatuh tempo pada setiap 6 bulan dari
                 Interest payment mechanism after the             tahun berjalan setelah tanggal berlaku diawali
                 WSBP Settlement Agreement becomes                sejak bulan Maret 2023/Interest payments will be
                 effective                                        made on the 25th which is due every 6 months of
                                                                  the current year after the effective date starting
                                                                  from March 2023
                                                              • Dalam hal tanggal pembayaran bunga tersebut
                                                                  bertepatan dengan hari libur termasuk hari Sabtu
                                                                  atau hari libur nasional, pembayaran bunga
                                                                  tersebut akan dilakukan pada hari kerja
                                                                  berikutnya/ In the event that the interest payment
                                                                  date coincides with a holiday including Saturday
                                                                  or a national holiday, the interest payment will be
                                                                  made on the following business day
            8    Koreksi bunga dan denda sebelum efektif     Bunga, denda dan biaya lainnya dari 26 Supplier
                 Perjanjian Perdamaian WSBP/Correction       WSBP dilakukan koreksi dan dicatat disisi WSBP
                 of interest and penalties prior to the      sebagai/nterest, fines and other fees from 26 WSBP
                 effectiveness of the WSBP Settlement        Suppliers are corrected and recorded on the WSBP
                 Agreement                                   side as:
                                                             • Terhadap bunga sebelum tanggal efektif berlaku
                                                                  Perjanjian Perdamaian WSBP dilakukan
                                                                  koreksi/For interest before the effective date of
                                                                  the WSBP Settlement Agreement, corrections
                                                                  are made.
                                                             • Seluruh benda dan biaya lainnya yang terdahulu
                                                                  dihapuskan/all objects and other costs that were
                                                                  previously written off
            9    Pembentukan fasilitas baru WSBP dan         • Fasilitas baru dibentuk atas nama WSBP yang
                 mekanisme Pengalihan/Establishment of            mencakup pokok sebesar Rp270.691.05.539
                                                102
Page 106
                                                                              The original financial statements included herein are in
                                                                                                            the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                   PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                           NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                 JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                              30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                 ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                (UNAUDITED)

                  a new WSBP        facility   and   transfer         dan bunga dicatat sesuai ketentuan pada
                  mechanism                                           Perjanjian Perdamaian WSBP/ A new facility was
                                                                      formed on behalf of WBP which includes a
                                                                      principal amounting to Rp270,691,05,539 and
                                                                      interest is recorded in accordance with the
                                                                      provisions of the WSBP Settlement Agreement
                                                                 • Terhadap biaya buga, denda dan biaya lainnya
                                                                      pada Supplier/Sub Kontraktor akan dikorekso
                                                                      sesuai Perjanjian Perdamaian WSBP dan dicatat
                                                                      di sisi WSBP/ Interest costs, fines and other
                                                                      costs to the Supplier/Sub-Contractor will be
                                                                      corrected according to the WSBP Amicable
                                                                      Agreement and recorded on the WSBP side.
                                                                 • Mekanisme pengalihan dilakukan secara
                                                                      bertahap sebagai pembentukan fasilitas kredit
                                                                      WSBP sesuai ketentuan yang berlaku di Bank
                                                                      Mandiri      dengan     total   fasilitas  senilai
                                                                      Rp270.691.905.539 dalam rangka pelaksanaan
                                                                      Perjanjian Perdamaian/The transfer mechanism
                                                                      is carried out in stages as the establishment of a
                                                                      WSBP credit facility in accordance with the
                                                                      applicable provisions at Bank Mandiri with a total
                                                                      facility of Rp270,691,905,539 in the context of
                                                                      implementing the Settlement Agreement
            10    Mekanisme Pembayaran Pokok/Principal           Pembayaran pokok dilakukan secara bullet payment
                  Payment Mechanism                              pada tahun ke 17 sejak tanggal berlaku Perjanjian
                                                                 Perdamaian WSBP/Principal payments are made in
                                                                 bullet payments in the 17th year from the effective
                                                                 date of the WSBP Settlement Agreement
            11    Pelunasan dipercepat/Expedited payment         Dimungkinkan        percepatan     pembayaran      (pre
                                                                 payment) pada tahun ke 10 sejak tanggal berlaku
                                                                 apabila hasil pemeriksaan dan evaluasi pada tahun
                                                                 ke 7sejak tanggal berlaku oleh Agen Pemantau
                                                                 Independen menunkukkan bahwa WSBP memiliki
                                                                 kemampuan keuangan untuk menyelesaikan
                                                                 kewajibannya/It is possible to accelerate payment
                                                                 (prepayment) in the 10th year from the effective date
                                                                 if the results of the inspection and evaluation in the
                                                                 7th year from the effective date by the Independent
                                                                 Monitoring Agent show that the WSBP has the
                                                                 financial capacity to complete its obligations

     Berdasarkan Surat Keterangan No. 143/III/SK/23                Based on Statement Letter No. 143/III/SK/23 dated
     tanggal 24 Maret 2023 dari notaris Siti Rohmah                March 24, 2023, from Notary Siti Rohmah Cahyana,
     Cahyana, SH telah dibuatkan Akta pada tanggal                 SH, a deed was made on March 24, 2023, in
     24 Maret 2023 sehubungan dengan fasilitas kredit              connection with the credit facility received by the
     yang diterima oleh Perusahaan dari PT Bank                    Company from PT Bank Mandiri (Persero) Tbk in the
     Mandiri (Persero) Tbk berupa Perjanjian Modal                 form of an Agreement Working capital No.
     Kerja    No.     RCO.BKS/KMK/2023        senilai              RCO.BKS/KMK/2023             amounting            to
     Rp270.691.905.539.                                            Rp270,691,905,539.

     Pada tanggal 30 Juni 2023, 31 Desember 2022                   As of June 30, 2023, December 31, 2022 and June
     dan 30 Juni 2022, saldo pinjaman bank jangka                  30, 2022, the balance of the Company's short-term
     panjang Perusahaan kepada PT Bank Mandiri                     bank loans to PT Bank Mandiri (Persero) Tbk
     (Persero) Tbk sebesar Rp305.298.506.454, nihil                amounted to Rp305,298,506,454, nil and nil,
     dan nihil.                                                    respectively.

     Berdasarkan hasil putusan PKPU, Pinjaman                      Based on the results of the PKPU decision, the
     Mandiri   dengan   nilai   tercatat  sebesar                  Mandiri Loans with a carrying amount of
     Rp270.691.905.539 dan utang bunga sebesar                     Rp270,691,905,539 and interest payable of
     Rp34.606.600.915   direstrukturisasi sebagai                  Rp34,606,600,915 were restructured as long-term
     pinjaman bank jangka Panjang (Catatan 43).                    bank loans (Note 43). The difference of
                                                      103
Page 107
                                                                                               The original financial statements included herein are in
                                                                                                                             the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                             PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                                     NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                           JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                        30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                           ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                          (UNAUDITED)

           Selisih sebesar Rp193.806.067.881 antara nilai                       Rp193,806,067,881 between the fair value of the new
           wajar pinjaman baru sebesar Rp111.492.438.573                        loan amounting to Rp110,492,438,573 (including
           (termasuk utang bunga) dengan nilai tercatat                         interest payable) and the carrying value of the loan
           pinjaman (termasuk utang bunga) diakui sebagai                       (including interest payable) is recognized as a gain on
           keuntungan atas modifikasi utang pada                                debt modification in “other income – net” in profit or
           “pendapatan lain-lain – bersih” dalam laba rugi                      loss (Note 32).
           (Catatan 32).

           Pinjaman Mandiri akan jatuh tempo pada tahun ke                      Mandiri Loans will mature in the 17th year from the
           17 sejak Tanggal Efektif.                                            Effective Date.

           Amortisasi diskonto untuk tahun yang berakhir                        Discount amortization for the years ended June 30,
           pada 30 Juni 2023 dan 31 Desember 2022                               2023, and December 31, 2022, amounting to
           masing-masing sebesar Rp4.338.809.571 dan                            Rp4,338,809,571 and nil, respectively, which was
           nihil, yang diakui sebagai bagian dari beban                         recognized as part of finance charges in the
           keuangan pada laporan laba rugi dan penghasilan                      statements of profit or loss and other comprehensive
           komprehensif lain.                                                   income.

      Penjelasan terkait restrukturisasi tertuang didalam                      The explanation regarding the restructuring is
      Perjanjian Perdamaian yang ditetapkan dalam Surat                        contained in the Settlement Agreement which is
      Pengadilan Negeri Jakarta Pusat Klas IA Khusus                           stipulated in the Special IA Class Central Jakarta
      No.     W10.U1.2868.Ht.03.VI.2022.RIN       tanggal                      District          Court         Letter         No.
      30 Juni 2022 perihal Pemberitahuan dan                                   W10.U1.2868.Ht.03.VI.2022.RIN date June 30, 2022
      Penyampaian Salinan Penetapan Perkara Niaga                              regarding Notification and Submission of a Copy of
      No. 497/Pdt.Sus/PKPU/2021/ PN.Niaga.Jkt.Pst                              Commercial        Case       Determination     No.
      (Catatan 44).                                                            497/Pdt.Sus/PKPU/2021/PN.Niaga.Jkt.Pst (Note 44).


16.   UTANG USAHA                                                        16. ACCOUNTS PAYABLE

      a.    Rincian berdasarkan pemasok                                         a.      Details by suppliers

                                                    30 Juni/         31 Desember/          30 Juni/
                                                    June 30,         December 31,          June 30,
                                                      2023               2022                2022
                                                       Rp                 Rp                  Rp
             Pihak Berelasi (Catatan 37)                                                                                          Related Parties (Note 37)
               PT Wijaya Karya Beton Tbk            31.541.213.356     32.103.016.138      30.914.826.058                      PT Wijaya Karya Beton Tbk
               Lain-lain (dibawah Rp10 Miliar)      15.511.035.112     16.361.672.890      28.800.991.703                      Others (below Rp10 Billion)
               Jumlah Pihak Berelasi                47.052.248.468     48.464.689.028      59.715.817.761                             Total Related Parties


             *) Disajikan Kembali pada Catatan 45                                                                                   *) As restated in Note 45




                                                                 104
Page 108
                                                                                                         The original financial statements included herein are in
                                                                                                                                       the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                                       PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                                               NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                                     JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                                  30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                                     ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                                    (UNAUDITED)

                                                           30 Juni/          31 Desember/            30 Juni/
                                                           June 30,          December 31,            June 30,
                                                             2023                2022                  2022
                                                              Rp                  Rp                    Rp

       Pihak Ketiga                                                                                                                                          Third Parties
         PT Intiniaga Sukses Abadi                        360.132.254.452      395.565.886.139     379.198.386.362                           PT Intiniaga Sukses Abadi
         PT Sinar Indahjaya Kencana                       164.172.068.224      139.695.657.354     169.889.285.983                         PT Sinar Indahjaya Kencana
         PT Sumiden Serasi Wire Products                  111.223.617.365      127.581.397.218     124.497.583.963                    PT Sumiden Serasi Wire Products
         PT Intiroda Makmur                                82.821.971.520       88.293.365.552      79.621.169.167                                  PT Intiroda Makmur
         PT Kingdom Indah                                  76.822.028.062       76.688.526.417      71.513.898.264                                   PT Kingdom Indah
         PT Jaya Makmur Eka Lestari                        72.944.941.426       84.518.901.603      63.484.369.507                         PT Jaya Makmur Eka Lestari
         PT Multi Welindo                                  66.287.393.466      105.766.806.447      82.416.482.056                                     PT Multi Welindo
         PT Janti Sarana Material Beton                    66.093.346.784       67.528.897.418      77.138.107.727                      PT Janti Sarana Material Beton
         PT Tiga Sekawan Serasi                            54.382.285.462       79.663.775.558      79.763.993.858                             PT Tiga Sekawan Serasi
         CV Djasa Autotruck                                51.011.091.470       51.908.948.835      48.617.346.565                                  CV Djasa Autotruck
         The Master Steel MFG                              48.852.112.793       61.137.218.430                   --                              The Master Steel MFG
         PT Putra Utama                                    43.429.026.327       40.395.918.474      50.051.471.885                                      PT Putra Utama
         PT Kimia Konstruksi Indonesia                     38.588.673.823       56.914.158.150      59.641.662.822                       PT Kimia Konstruksi Indonesia
         PT Jui Shin Indonesia                             38.506.829.461       31.926.955.278      28.103.563.448                                PT Jui Shin Indonesia
         PT Intim Putra Perkasa                            36.938.803.052       36.379.068.668      43.754.272.043                               PT Intim Putra Perkasa
         PT Bangun Djaja Mandiri                           35.688.875.737       37.982.640.170      36.318.736.432                             PT Bangun Djaja Mandiri
         PT Sino Persada Indonesia                         33.491.473.168       40.330.100.548      38.989.397.496                          PT Sino Persada Indonesia
         PT Batu Sarana Persada                            26.682.568.503       43.965.146.470      41.827.182.481                             PT Batu Sarana Persada
         PT Wirya Krenindo Perkasa                         26.425.602.050       26.761.427.659      18.707.920.007                          PT Wirya Krenindo Perkasa
         PT Nexco Indonesia                                25.920.828.030       25.573.918.136      26.310.394.368                                 PT Nexco Indonesia
         PT Solusi Bangun Andalas                          24.830.179.057       24.877.415.258      19.218.685.806                           PT Solusi Bangun Andalas
         PT Solusi Bangun Beton                            23.457.451.160       26.221.361.384      25.028.321.852                             PT Solusi Bangun Beton
         PT Hanil Jaya Steel                               22.918.803.198       18.419.300.000      19.672.844.194                                  PT Hanil Jaya Steel
         PT Bumi Nusaraya Utama                            22.477.523.934       41.778.464.329      42.734.520.456                           PT Bumi Nusaraya Utama
         PT Beton Prima Inti                               21.472.391.117       21.890.377.900      25.052.116.399                                  PT Beton Prima Inti
         PT Batu Alam Seiwampu                             21.202.532.657       21.251.474.570      21.306.365.020                             PT Batu Alam Seiwampu
         PT Sigma Cipta Caraka                             19.392.691.642       17.138.025.408                   --                             PT Sigma Cipta Caraka
         PT Mortar Nasional Indonesia                      18.716.606.339       12.160.419.698                   --                       PT Mortar Nasional Indonesia
         PT Adil Jaya                                      18.298.599.432       32.858.184.294      31.656.316.594                                          PT Adil Jaya
         PT Sumber Prima Teknik                            18.266.840.201       19.418.490.821      19.410.444.657                             PT Sumber Prima Teknik
         PT Watu Lawang                                    17.921.187.016       19.868.635.434      23.537.198.307                                     PT Watu Lawang
         PT Kencana Cakra Buana                            17.521.867.490                    --                                              PT Kencana Cakra Buana
         PT Concrete Technology Indonesia                  17.049.986.132       24.288.626.116      25.026.167.058                   PT Concrete Technology Indonesia
         PT Delta Systech Indonesia                        16.144.892.448       16.156.693.908                   --                         PT Delta Systech Indonesia
         PT Bumi Steel Indonesia                           15.110.831.627                    --                  --                            PT Bumi Steel Indonesia
         PT Indoutama Metal Works                          14.552.669.976       16.147.399.760                   --                         PT Indoutama Metal Works
         PT United Tractors                                14.440.000.000       14.440.000.000      22.440.000.000                                   PT United Tractors
         PT Karsa Prima Permata Nusa                       14.312.488.681       14.575.418.630      12.029.528.375                       PT Karsa Prima Permata Nusa
         PT Trikusuma Jaya Perkasa                         14.259.601.263       14.300.756.905      12.234.780.000                         PT Trikusuma Jaya Perkasa
         PT Anita Jaya                                     13.809.348.497       15.306.516.637      15.895.686.392                                        PT Anita Jaya
         PT Sumatera Teknindo                              12.991.798.286       13.187.651.612      12.361.885.113                               PT Sumatera Teknindo
         PT Trijaya Agung Makmur                           12.467.758.600       14.078.169.504      11.342.514.273                           PT Trijaya Agung Makmur
         PT Doraja Indo Sukses                             11.663.068.334       12.348.346.408                   --                              PT Doraja Indo Sukses
         PT Cemindo Cemerlang                              11.618.040.400       11.829.378.524      12.692.240.487                              PT Cemindo Cemerlang
         PT Anggie Jaya Bersama                            11.363.088.468       12.500.210.184                   --                           PT Anggie Jaya Bersama
         PT Detede                                         10.791.758.501       17.736.681.315      17.298.678.870                                            PT Detede
         PT Hanwa Indonesia                                10.429.070.276       10.202.656.244      10.202.656.244                                 PT Hanwa Indonesia
         PT Wahana Anugerah Pratama                        10.355.044.066       10.368.953.217      10.368.953.217                      PT Wahana Anugerah Pratama
         PT Angkasa Pura Logistik                          10.163.204.400                    --                  --                           PT Angkasa Pura Logistik
         PT Pulau Indah Dirgantara                         10.004.318.389       21.362.096.760      17.200.576.701                           PT Pulau Indah Dirgantara
         PT Inti Bumi Energy                                9.723.699.228       16.801.551.472      15.321.827.437                                  PT Inti Bumi Energy
         PT Kordon Putra                                    9.670.047.426       21.164.689.166      18.438.137.226                                      PT Kordon Putra
         PT Maritim Polikaryatama                           9.579.985.799       12.632.830.945                   --                           PT Maritim Polikaryatama
         PT Daya Mitra Sarana                               8.356.234.594       11.381.133.601                   --                               PT Daya Mitra Sarana
         PT Mitra Karya Prospekta                           6.144.316.328       19.933.425.348      19.933.425.348                            PT Mitra Karya Prospekta
         PT Delplast Pratama Putra                          5.281.107.019       16.105.728.305      15.219.868.573                           PT Delplast Pratama Putra
         PT Bumi Galba Nusantara                            5.044.900.461       11.365.327.217      12.437.779.540                           PT Bumi Galba Nusantara
         PT Caraka Anugrah Santoso                          4.893.617.850       11.195.230.972      13.945.296.090                         PT Caraka Anugrah Santoso
         PT Citra Baru Steel                                2.769.261.360       21.435.257.301      36.006.656.053                                   PT Citra Baru Steel
         PT Perusahaan Angkutan Darat Samudera Perdana      2.631.865.480        2.655.500.000       2.576.000.000     PT Perusahaan Angkutan Darat Samudera Perdana
         PT Existama Putranindo                                         --      10.407.931.814      10.814.915.034                             PT Existama Putranindo
         PT Straba Jasa Prima                                           --      11.413.784.764                   --                               PT Straba Jasa Prima
         Lainnya (dibawah Rp10 miliar)                    760.015.820.909      952.125.513.925     941.226.114.806                          Others (below Rp10 Billion)
       Jumlah Pihak Ketiga                               2.762.530.289.215   3.231.908.324.174    3.126.128.777.066                                    Total Third Parties
       Jumlah                                            2.809.582.537.683   3.280.373.013.202    3.185.844.594.827                                                  Total


       *) Disajikan Kembali pada Catatan 45                                                                                                       *) As restated in Note 45


                                                                         105
Page 109
                                                                                                           The original financial statements included herein are in
                                                                                                                                         the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                                      PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                                              NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                                    JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                                 30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                                    ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                                   (UNAUDITED)


   b.     Rincian berdasarkan umur adalah sebagai                                        b.     Aging of accounts payable is as follows:
          berikut:

                                                         30 Juni/            31 Desember/             30 Juni/
                                                         June 30,            December 31,             June 30,
                                                           2023                  2022                   2022
                                                            Rp                    Rp                     Rp


              > 30 - 90 hari                            272.202.461.013       381.928.597.015        211.929.952.658                                    > 30 - 90 days
              > 90 - 180 hari                           105.726.615.211       150.445.802.004        244.863.498.515                                   > 90 - 180 days
              > 180 - 360 hari                          179.210.228.403        92.391.835.203        142.632.129.150                                  > 180 - 360 days
              > 360 hari                              2.252.443.233.056     2.655.606.778.980      2.586.419.014.504                                       > 360 days
            Jumlah                                    2.809.582.537.683     3.280.373.013.202      3.185.844.594.827                                                Total


            *) Disajikan Kembali pada Catatan 45                                                                                                 *) As restated in Note 45

   Semua utang usaha dalam mata uang Rupiah.                                             All accounts payable are denominated in Rupiah.

   Jangka waktu kredit dari pembelian bahan baku                                         Purchases of raw materials have credit terms of 30
   utama berkisar 30 hari.                                                               days.

   Tidak ada bunga yang dibebankan pada utang usaha                                      No interest is charged for overdue accounts payable.
   yang telah jatuh tempo.

   Utang usaha dengan nilai tercatat sebesar                                             Accounts payable with carrying amount of
   Rp1.431.365.371.970 akan direstrukturisasi sebagai                                    Rp1,431,365,371,970 will be restructured as other
   ekuitas   lainnya  berdasarkan      hasil    PKPU                                     equity based on PKPU result (Note 43).
   (Catatan 43).

17. UTANG LAIN-LAIN                                                               17. OTHER PAYABLES

                                                    30 Juni/               31 Desember/               30 Juni/
                                                    June 30,               December 31,               June 30,
                                                      2023                     2022                     2022
                                                       Rp                       Rp                       Rp
   Pihak Berelasi                                                                                                                                     Related Parties
   Lain-lain                                       20.260.904.180           17.951.130.090           77.127.711.007                                            Others
   Jumlah Pihak Berelasi                           20.260.904.180           17.951.130.090           77.127.711.007                            Total Related Parties

   Pihak Ketiga                                                                                                                                     Third Parties
   Jamsostek                                        1.695.576.695               768.792.351             445.285.249                                   Jamsostek
   Dana Pensiun Lembaga Keuangan                      330.363.219               226.682.359             110.814.046               Dana Pensiun Lembaga Keuangan
   Lain-lain                                           55.895.000                55.895.000              55.895.000                                        Others
   Jumlah Pihak Ketiga                              2.081.834.914            1.051.369.710              611.994.295                               Total Third Parties
   Jumlah                                          22.342.739.094           19.002.499.800           77.739.705.302                                                 Total




18. UTANG PAJAK                                                                   18. TAXES PAYABLE

                                                         30 Juni/               31 Desember/               30 Juni/
                                                         June 30                December 31,               June 30
                                                          2023                      2022                    2022
                                                           Rp                        Rp                      Rp

   Pajak atas Jasa Konstruksi                           40.916.572.167           43.343.881.519            54.375.932.593                    Construction Tax Payable
   Pajak Penghasilan Pasal 21                              858.320.512              626.009.091               974.964.972                        Income Tax Article 21
   Pajak Penghasilan Pasal 4 (2) - Final                   405.103.502              962.239.012               388.781.386                Income Tax Article 4 (2) - Final
   Pajak Penghasilan Pasal 23                              930.283.459              950.105.785               992.901.079                        Income Tax Article 23
   Pajak Penghasilan Badan                                           --                       --              604.022.782                       Corporate Income Tax
   Jumlah                                               43.110.279.640           45.882.235.407            57.336.602.812                                           Total


                                                                          106
Page 110
                                                                                               The original financial statements included herein are in
                                                                                                                             the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                             PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                                     NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                           JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                        30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                           ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                          (UNAUDITED)

19. BEBAN AKRUAL                                                         19. ACCRUED EXPENSES

                                        30 Juni/               31 Desember/                30 Juni/
                                        June 30,               December 31,                June 30,
                                          2023                     2022                      2022
                                           Rp                       Rp                        Rp

   Beban Aset Tetap                    143.293.839.345          143.293.839.345           145.901.205.145         Property, Plant, and Equipment Expenses
   Beban Produksi                      131.418.470.067          133.667.842.610            77.887.310.892                              Production Expenses
   Beban Konstruksi                     60.249.957.966          137.293.465.234           145.818.203.222                            Construction Expenses
   Beban Kantor                         36.116.749.634           41.464.375.197            24.102.288.884                                   Office Expenses
   Beban Pegawai                        27.918.386.799           30.909.276.753            13.471.520.114                               Employee Expenses
   Beban Bunga                          19.743.537.393           17.461.021.011                         --                                Interest Expenses
   Jasa Produksi                        18.787.554.848           26.390.176.539            19.952.370.896                                 Production Benefit
   Beban Ekspedisi                       4.132.471.889           10.254.925.668                         --                             Expedition Expenses
   Tantiem                               4.098.658.427            4.707.367.624            17.930.018.382                                           Tantiem
   Beban Umum                            2.265.266.726            2.863.056.490             2.676.084.574                                General Expenses
   Lain-lain                            22.155.220.299           30.456.180.981            25.004.679.017                                            Others
   Jumlah                              470.180.113.393          578.761.527.452           472.743.681.126                                              Total


   Aset Tetap                                                                  Property and Equipment

   Merupakan akrual atas aset tetap yang masih dalam                           Property, Plant and Equipment payables that are still
   proses commissioning dan belum dilakukan                                    in the commissioning process and and have not yet
   penagihan dari pihak ketiga.                                                been billed from third parties.

   Akrual Beban Konstruksi                                                     Construction Expenses

   Beban konstruksi merupakan akrual atas progress                             Construction espense repredetepresents accrual for
   konstruksi yang belum ditagihkan oleh pihak ketiga.                         construction progress that has not been billed by third
                                                                               parties.

   Akrual Produksi                                                             Production Accrual

   Merupakan akrual atas pelaksanaan pekerjaan yang                            Represents accruals for the execution of work that
   belum ditagihkan oleh pihak ketiga maupun tenaga                            has not been billed by third parties or labor.
   kerja.

20. UANG MUKA DARI PELANGGAN                                             20. ADVANCES FROM CUSTOMERS

                                                   30 Juni/            31 Desember/             30 Juni/
                                                   June 30,            December 31,             June 30,
                                                     2023                  2022                   2022
                                                      Rp                    Rp                     Rp

   Pihak Berelasi (Catatan 37)                                                                                                    Related Parties (Note 37)
      PT Waskita Karya (Persero) Tbk               21.037.902.785       21.217.368.434          49.403.794.450            PT Waskita Karya (Persero) Tbk
      Waskita - Nindya - Modern KSO                 9.056.476.614                    --                      --            Waskita - Nindya - Modern KSO
      PT Kresna Kusuma Dyandra Marga                4.934.146.243        6.395.330.727           6.395.330.727          PT Kresna Kusuma Dyandra Marga
      Waskita - Nindya KSO                          2.130.379.800                    --                      --
      Waskita BRP KSO                               1.204.235.700        2.610.582.800                       --                         Waskita BRP KSO
      Waskita - Utama KSO                           1.004.344.875        1.004.344.875                       --                     Waskita - Utama KSO
      Lainnya (di bawah Rp 1 Miliar)                1.308.760.233        1.208.437.878             106.162.500                  Others (below Rp 1 Billion)
   Jumlah Pihak Berelasi                           40.676.246.251       32.436.064.714          55.905.287.677                        Total Related Parties
   Pihak Ketiga                                                                                                                                 Third Parties
      PT Duta Graha Karya                          19.392.282.744       21.819.053.868          27.861.340.186                        PT Duta Graha Karya
      JGC Indonesia                                 8.590.784.420                    --                      --                              JGC Indonesia
      PT Dadi Develop Indonesia                     1.609.200.000        2.353.500.000           1.609.200.000                 PT Dadi Develop Indonesia
      PT Yasa Patria Perkasa                        1.276.210.000        1.445.100.000                       --                    PT Yasa Patria Perkasa
      PT Inti Karya Persada Tehnik                  1.364.934.150        1.364.934.150           1.364.934.150                PT Inti Karya Persada Tehnik
      PT Dharma Subur Satya                         1.002.680.400                    --                      --                    PT Dharma Subur Satya
      PT Gunakarya Nusantara                                    --       6.131.420.000                       --                   PT Gunakarya Nusantara
      Lainnya (di bawah Rp1 Miliar)                 4.370.004.527        8.051.836.600           4.295.474.934                   Others (below Rp1 Billion)
   Jumlah Pihak Ketiga                             37.606.096.241       41.165.844.618          35.130.949.270                           Total Third Parties
   Jumlah                                          78.282.342.492       73.601.909.332          91.036.236.947                                         Total


                                                                 107
Page 111
                                                                                      The original financial statements included herein are in
                                                                                                                    the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                       PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                               NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                     JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                  30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                     ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                    (UNAUDITED)

21. UTANG OBLIGASI                                                  21. BONDS PAYABLE

                                                30 Juni/          31 Desember/           30 Juni/
                                                June 30,          December 31,           June 30,
                                                  2023                2022                 2022
                                                   Rp                  Rp                   Rp
   Utang Obligasi Jangka Pendek                                                                                      Short-term Bonds Payable
   Obligasi Tahap 1 Tahun 2019                  457.614.726.667     457.614.726.667     445.556.423.610                       Bond 1 Year 2019
   Obligasi Tahap 2 Tahun 2019                1.393.155.194.444   1.393.155.194.444   1.358.220.312.500                       Bond 2 Year 2019
   Jumlah                                     1.850.769.921.111   1.850.769.921.111   1.803.776.736.110                                  Total


   *) Disajikan Kembali pada Catatan 45                                                                                 *) As restated in Note 45

                                                 30 Juni/         31 Desember/           30 Juni/
                                                 June 30,         December 31,           June 30,
                                                   2023               2022                 2022
                                                    Rp                 Rp                   Rp
   Utang Obligasi Jangka Panjang                                                                                     Long-term Bonds Payable
   Obligasi Tahap 1 Tahun 2019                  80.755.540.000      80.755.540.000      78.627.604.166                       Bond 1 Year 2019
   Obligasi Tahap 2 Tahun 2019                 245.850.916.667     245.850.916.667     239.685.937.500                       Bond 2 Year 2019
   Jumlah                                      326.606.456.667     326.606.456.667     318.313.541.666                                  Total
   Diskonto yang belum diamortisasi           (106.480.555.202)   (114.860.517.297)   (115.918.375.518)                   Less: Current Maturity
   Jumlah                                      220.125.901.465     211.745.939.370     202.395.166.148                                     Total


   *) Disajikan Kembali pada Catatan 45                                                                                 *) As restated in Note 45


    Berdasarkan Akta Perjanjian Perwaliamanatan                            Based on the Trustee Agreement Deed No. 37 dated
    No. 37 tanggal 15 April 2019 yang dibuat dihadapan                     April 15, 2019 of Fathiah Helmi, S.H., Notary in
    Fathiah Helmi, S.H., Notaris di Jakarta. Perusahaan                    Jakarta, the Company issued Waskita Beton Precast
    menerbitkan Obligasi Berkelanjutan I Waskita Beton                     Phase I Year 2019 Sustainable Bonds, with a fixed
    Precast Tahap I Tahun 2019, dengan tingkat bunga                       interest rate of 9.95% per annum and a face value of
    tetap    9,95%     per     tahun     dengan     nilai                  Rp500,000,000,000.
    Rp500.000.000.000.

   Berdasarkan Akta Perjanjian Perwaliamanatan                             Based on the Trustee Agreement Deed No. 47 dated
   No. 47 tanggal 8 Oktober 2019 yang dibuat                               October 8, 2019 of Jose Dima Satria, S.H., Notary in
   dihadapan Jose Dima Satria, S.H., Notaris di                            Jakarta, the Company issued Waskita Beton Precast
   Jakarta.   Perusahaan     menerbitkan    Obligasi                       Phase II year 2019 Sustainable Bonds, with a fixed
   Berkelanjutan I Waskita Beton Precast Tahap II                          interest rate of 9.75% per annum and a face value of
   Tahun 2019, dengan tingkat bunga tetap 9,75% per                        Rp1,500,000,000,000.
   tahun dengan nilai Rp1.500.000.000.000.

   Berdasarkan surat No. 230/WBP/DIR/2021 tanggal                          Based on letter No. 230/WBP/DIR/2021 dated
   16 September 2021 kepada Otoritas Jasa Keuangan                         September 16, 2021 to the Financial Services
   perihal Penyampaikan bukti iklan hasil pemeringkat                      Authority regarding Submission of proof of
   perusahaan, telah ditetapkan peringkat Perusahaan                       advertising results from Company ratings, it has
   adalah BBB-.                                                            been determined that the Company's bond rating is
                                                                           BBB-.

   Berdasarkan surat No. 163/WBP/CORSEC/2022                               Based on letter No. 163/WBP/CORSEC/2022 dated
   tanggal 16 September 2022 kepada Otoritas Jasa                          September 16, 2022 to the Financial Services
   Keuangan perihal Penyampaikan bukti iklan hasil                         Authority regarding Submission of proof of
   pemeringkat perusahaan, telah ditetapkan peringkat                      advertising results from Company ratings, it has
   Perusahaan adalah D.                                                    been determined that the Company's bond rating is
                                                                           D.

   Berdasarkan surat dari PT Pefindo dengan nomor                          Based on a letter from PT Pefindo with letter number
   surat RC-252/PEF-DIR/III2023 tanggal 21 Maret                           RC-252/PEF-DIR/III2023 dated March 21, 2023
   2023 perihal Sertifikat Pemeringkat atas Obligasi dan                   regarding Rating Certificates for PT Waskita Beton
   Obligasi Wajib Konversi PT Waskita Beton Precast                        Precast Tbk's Bonds and Compulsory Convertible
   Tbk menyatakan bahwa Sertifikat Hasil Pemeringkat                       Bonds stated that the Rating Certificates for Waskita
   atas Obligasi Waskita Beton Precast I Tahun 2022,                       Beton Precast I Year 2022 Bonds, Bonds
                                                            108
Page 112
                                                                                     The original financial statements included herein are in
                                                                                                                   the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                       PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                               NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                     JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                  30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                     ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                    (UNAUDITED)

   Obligasi Wajib Konversi Waskita Beton Precast I                         Compulsory Conversion of Waskita Beton Precast I
   Tahun 2023, Obligasi Waskita Beton Precast II Tahun                     Year 2023, Waskita Beton Precast II Bonds Year
   2022 dan Obligasi Wajib Konversi Waskita Beton                          2022 and Waskita Beton Precast II Compulsory
   Precast II Tahun 2023 telah diputuskan peringkatnya                     Conversion Bonds Year 2023 have been assigned a
   menjadi B (Single B).                                                   B (Single B) rating.

   Berdasarkan hasil PKPU, utang obligasi dengan nilai                     Based on PKPU results, bonds payable with
   tercatat Rp326.606.456.667 merupakan 15% dari                           carrying amount of Rp326,606,456,667, which is
   total nilai tercatat utang obligasi lama sebesar                        equivalent to 15% of the total carrying amount of the
   Rp2.000.000.000.000 ditambah accrued bunga                              old        bonds       payable     amounting        to
   sebesar Rp177.376.377.781 yang direstrukturisasi                        Rp2,000,000,000,000 plus accrued interest of
   menjadi utang obligasi jangka panjang dan sisanya                       Rp177,376,377,781, were restructured as long-term
   sebesar Rp1.850.769.921.111 sebagai utang obligasi                      bonds payable and the remaining balance
   jangka         pendek.        Selisih        sebesar                    amounting to Rp1,850,769,921,111 as short-term
   Rp106.480.555.199 antara nilai wajar utang obligasi                     bonds         payable.     The      difference      of
   baru sebesar Rp220.125.901.468 dan nilai tercatat                       Rp106,480,555,199 between the fair value of the
   utang obligasi lama diakui sebagai keuntungan atas                      new         bonds      payable      amounting       to
   modifikasi utang pada “pendapatan lain-lain – bersih”                   Rp220,125,901,468 and the carrying amount of the
   dalam laba rugi (Catatan 32).                                           new bonds payable was recognized as gain on
                                                                           modification of debt under “other income – net” in
                                                                           profit or loss (Note 32).

   Amortisasi diskonto untuk tahun yang berakhir pada                      Amortization of discount for the year ended June 30,
   30 Juni 2023 dan 31 Desember 2022 masing-masing                         2023 and December 31, 2022 amounted to
   sebesar Rp12.457.802.536 dan Rp4.077.840.438,                           Rp12,457,802,536         and       Rp4,077,840,438,
   yang diakui sebagai bagian dari beban keuangan                          respectively, which is recognized as part of finance
   pada laporan laba rugi dan penghasilan                                  charges in the statement of profit or loss and other
   komprehensif lain.                                                      comprehensive income.

   Utang obligasi akan jatuh tempo pada tahun ke 6                         Bonds payable will be due on the 6th year from
   sejak Tanggal Efektif dengan tingkat bunga 2% per                       Effective Date with interest rate of 2% per annum.
   tahun.

22. LIABILITAS SEWA                                                       22. LEASE LIABILITIES

                                          30 Juni/           31 Desember/                30 Juni/
                                          June 30,           December 31,                June 30,
                                            2023                 2022                      2022
                                             Rp                   Rp                        Rp

   Tanah                                  3.880.564.720            3.880.564.720         5.268.658.334                                 Land
   Kendaraan                              6.073.994.890            6.073.995.042         9.828.931.485                              Vehicles
   Jumlah                                 9.954.559.610            9.954.559.762        15.097.589.819                                Total
   Bagian yang jatuh tempo dalam
     waktu satu tahun                    (2.971.809.989)          (2.971.809.989)       (5.297.362.269)                   Current maturity

   Liabilitas sewa jangka panjang         6.982.749.621            6.982.749.773         9.800.227.550        Non-current lease liabilities


   Rincian liabilitas sewa berdasarkan nama penyewa:                       Details of lease liabilities by lessor:

                                         30 Juni/           31 Desember/               30 Juni/
                                         June 30,            December 31              June 30,
                                           2023                    2022                 2022
                                            Rp                      Rp                    Rp


   Burhanuddin Nasution                  4.647.825.000           4.647.825.000        4.647.825.000                  Burhanuddin Nasution
   Koperasi Waskita                      4.843.971.792           4.843.971.943        9.828.931.484                       Koperasi Waskita
   Lain-lain                              462.762.818             462.762.819           620.833.335                                  Others

   Liabilitas sewa                       9.954.559.610           9.954.559.762       15.097.589.819                       Lease liabilities



                                                           109
Page 113
                                                                                          The original financial statements included herein are in
                                                                                                                        the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                            PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                                    NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                          JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                       30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                          ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                         (UNAUDITED)

23. MODAL SAHAM              DAN         TAMBAHAN     MODAL              23. SHARE CAPITAL AND ADDITIONAL PAID-IN
    DISETOR                                                                  CAPITAL

   a.   Modal Saham                                                           a.     Share Capital

                                            30 Juni/June 30 , 2023 dan/and 31 Desember/December 31 , 2022
                                                                 30 Juni/June 30, 2022
                                                                     Persentase          Jumlah Modal
                                                 Jumlah             Kepemilikan/            Disetor/
                                                 Saham/              Percentage          Total Paid-Up
                                                  Total             of ownership            Capital
                                                 Shares                   %                    Rp

        PT Waskita Karya (Persero) Tbk          15.816.680.599              60,00%       1.581.668.059.900       PT Waskita Karya (Persero) Tbk
        Koperasi Waskita                                13.935               0,00%               1.393.500                    Koperasi Waskita
        PT Waskita Beton Precast tbk             1.845.281.000               7,00%         184.528.100.000         PT Waskita Beton Precast tbk
        Masyarakat                               8.699.182.000              33,00%         869.918.200.000                               Public
        Jumlah                                  26.361.157.534                100%       2.636.115.753.400                                  Total


        Berdasarkan Akta keputusan sirkuler sebagai                                Based on Deed of Circular Resolution of the
        pengganti RUPS No. 7 tanggal 10 Februari 2016                              Shareholders in lieu of GMS No. 7 dated
        yang dibuat dihadapan Notaris Yusdim Fahim,                                February 10, 2016 as notarized by Notary Yusdim
        S.H, pemegang saham setuju untuk meningkatkan                              Fahim, S.H, the shareholders of the Company
        modal ditempatkan dan disetor Perusahaan                                   agreed to increase the Company's subscribed and
        dari    Rp835.056.000.000     atau    menjadi                              paid-up capital from Rp835,056,000,000 to
        Rp1.135.056.000.000 atau 1.135.056 lembar                                  Rp1,135,056,000,000 or 1,135,056 shares.
        saham.

        Berdasarkan Akta Rapat Umum Pemegang                                       Based on Deed of Extraordinary General Meeting
        Saham Luar Biasa (RUPSLB) No. 23 tanggal                                   of Shareholders (EGMS) No. 23 dated
        8 Juni 2016, pemegang saham menyetujui                                     June 8, 2016, the shareholders approved to
        peningkatan modal dasar Perusahaan dari                                    increase the Company’s authorized capital from
        Rp2.470.288.000.000 yang terdiri dari 2.470.288                            Rp2,470,288,000,000 consisting of 2,470,288
        lembar    saham     dengan     nilai      nominal                          shares with par value per share of Rp1,000,000 to
        per lembar saham Rp1.000.000, menjadi                                      become Rp6,326,677,813,600 consisting of
        Rp6.326.677.813.600     yang      terdiri    dari                          63,266,778,136 shares with par value of
        63.266.778.136 lembar saham dengan nilai                                   Rp100 per share.
        nominal per lembar Rp100.

        Berdasarkan Akta RUPSLB No. 55 tanggal                                     Based on Deed of EGMS No. 55 dated
        21 Desember 2016, pemegang saham                                           December 21, 2016, the shareholders increased
        Perusahaan meningkatkan dan melakukan                                      and performed stock split of the subscribed and
        pemecahan saham untuk modal ditempatkan dan                                paid-in capital from 1,135,056 shares with par
        disetor penuh dari semula 1.135.056 saham                                  value per share of Rp1,000,000 (nominal value of
        dengan nilai nominal per lembar saham sebesar                              Rp1,135,056,000,000) to 26,361,157,534 shares
        Rp1.000.000 (jumlah nilai nominal sebesar                                  with par value per share of Rp100 (nominal value
        Rp1.135.056.000.000) menjadi 26.361.157.534                                of      Rp2,636,115,753,400).      This    deed
        saham      dengan     nilai  nominal   Rp100                               was        approved      by     the      Ministry
        dengan     (jumlah   nilai  nominal   sebesar                              of     Law    and    Human     Rights   of   the
        Rp2.636.115.753.400). Akta ini telah mendapat                              Republic       of    Indonesia     based      on
        pengesahan dari Kementerian Hukum dan Hak                                  letter   No.      AHU-AH.01.03-0110448     dated
        Asasi Manusia Republik Indonesia dengan                                    December 21, 2016.
        berdasar surat No. AHU-AH.01.03-0110448
        tanggal 21 Desember 2016.




                                                                 110
Page 114
                                                                                                      The original financial statements included herein are in
                                                                                                                                    the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                                PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                                        NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                              JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                           30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                              ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                             (UNAUDITED)

       Ringkasan setoran modal yang dilakukan adalah                                          A summary of capital contributions made are as
       sebagai berikut:                                                                       follows:
                                                     30 Juni/            31 Desember/              30 Juni/
                                                     June 30,            December 31               June 30,
                                                       2023                  2022                    2022
                                                        Rp                    Rp                      Rp
       Modal Saham                                                                                                                                           Authorized Capital
        Modal Dasar - 63.266.778.136 saham                                                                                          Authorized Capital 63,266,778,136 shares
         per 30 Juni 2023 dan 31 Desember 2022                                                                               as of June 30, 2023 and December 31, 2022,
          nilai nominal Rp100 per saham                                                                                                      par value of Rp100 per share
          pada 30 Juni 2023 dan 31 Desember 2022    6.326.677.813.600     6.326.677.813.600      6.326.677.813.600            as of June 30, 2023 and December 31, 2022

       Penyertaan Modal                                                                                                                                          Paid-up Capital
         PT Waskita Karya (Persero) Tbk                                                                                                     PT Waskita Karya (Persero) Tbk
          Modal Disetor dan Ditempatkan             1.260.457.453.403     1.260.457.453.403      1.260.457.453.403                                         Paid-up Capital
          Inbreng Aset Tetap                                                                                                       Inbreng Property, Plant and Equipment
          dan Persediaan Tahap I :                                                                                                              and Inventories Phase I :
          Persediaan                                  30.702.000.000         30.702.000.000         30.702.000.000                                             Inventories
          Aset Tetap :                                                                                                                    Property, Plant and Equipment:
          Tanah                                       46.074.000.000        46.074.000.000          46.074.000.000                                                   Land
          Bangunan dan Gedung                          9.227.000.000         9.227.000.000           9.227.000.000                                                Building
          Peralatan Proyek Golongan I dan II         152.724.000.000       152.724.000.000         152.724.000.000                             Project Equipment I and II
         Jumlah                                     1.499.184.453.403     1.499.184.453.403      1.499.184.453.403                                                        Total

         Inbreng Aset Tetap                                                                                                           Inbreng Property, Plant and Equipment
           dan Persediaan Tahap II :                                                                                                           and Inventories Phase II :
         Tanah                                        33.670.000.000         33.670.000.000         33.670.000.000                                                     Land
         Bangunan dan Gedung                          37.021.000.000         37.021.000.000         37.021.000.000                                                  Building
         Peralatan Proyek Golongan I dan II           11.793.000.000         11.793.000.000         11.793.000.000                                Project Equipment I and II
         Jumlah                                       82.484.000.000         82.484.000.000         82.484.000.000                                                        Total

         Jumlah Penyertaan Modal                                                                                                                   Total Paid-up Capital of
          PT Waskita Karya (Persero) Tbk            1.581.668.059.900     1.581.668.059.900      1.581.668.059.900                       PT Waskita Karya (Persero) Tbk
          Koperasi Waskita                                  1.393.500             1.393.500              1.393.500                                    Koperasi Waskita
          PT Waskita Beton Precast tbk                184.528.100.000       184.528.100.000        184.528.100.000                         PT Waskita Beton Precast tbk
          Masyarakat (<5%)                            869.918.200.000       869.918.200.000        869.918.200.000                                         Public (<5%)
       Jumlah                                       2.636.115.753.400     2.636.115.753.400      2.636.115.753.400                                                            Total


  b. Tambahan Modal Disetor                                                          b.       Additional Paid-in Capital
                                                     30 Juni/            31 Desember/             30 Juni/
                                                     June 30,            December 31              June 30,
                                                       2023                  2022                   2022
                                                        Rp                    Rp                     Rp

       Jumlah Saham yang Dikeluarkan                   10.544.463.000        10.544.463.000         10.544.463.000                                     Number of shares issued
       Nilai Jual Perdana per Saham                               490                   490                    490                                    Initial sale value per share
       Nilai Nominal per Saham                                    100                   100                    100                                                       Par value
       Agio per Saham                                             390                   390                    390                                                 Agio per shares
       Jumlah Agio Saham                           4.112.340.570.000     4.112.340.570.000      4.112.340.570.000                                             Total Paid in Capital
       Biaya Emisi Saham                             (94.256.955.187)      (94.256.955.187)       (94.256.955.187)                                          Share issuance costs
       Bersih                                      4.018.083.614.813     4.018.083.614.813      4.018.083.614.813                                                              Net
       Penyesuaian atas transaksi                                                                                                     Adjustment from restructuring transaction
         restrukturisasi entitas pengendali          (73.554.205.952)      (73.554.205.952)       (73.554.205.952)                        of entities under common Control
       Jumlah                                      3.944.529.408.861     3.944.529.408.861       3.944.529.408.861                                                           Total


      Biaya emisi saham merupakan biaya yang                                            Share issuance costs are costs related to the
      berkaitan dengan penerbitan efek ekuitas                                          issuance of equity securities. These costs include
      Perusahaan atau perusahaan publik. Biaya ini                                      fees and commissions paid to the underwriter,
      mencakup fee dan komisi yang dibayarkan kepada                                    supporting institutions and professionals in capital
      penjamin emisi, lembaga dan profesi penunjang                                     markets, and the registration document printing costs,
      pasar modal, dan biaya pencetakan dokumen                                         cost of equity securities listing on the stock exchange,
      pernyataan pendaftaran, biaya pencatatan efek                                     as well as promotional cost in accordance with the
      ekuitas dibursa efek, serta biaya promosi sesuai                                  Decision of the Chairman of the Capital Market Board
      dengan Keputusan Ketua Badan Pasar Modal                                          No. Kep-347/BL/2012 dated June 25, 2012,
      No. Kep-347/BL/2012 tanggal 25 Juni 2012,                                         regulation No. VIII.G.7 on guidelines for the
      peraturan No. VIII.G.7 tentang pedoman penyajian                                  preparation of financial statements. Share issuance
      laporan keuangan. Biaya emisi efek ekuitas                                        costs originated from the initial public offering in 2016.
      berasal dari penawaran perdana tahun 2016.

                                                                   111
Page 115
                                                                                                         The original financial statements included herein are in
                                                                                                                                       the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                                       PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                                               NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                                     JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                                  30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                                     ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                                    (UNAUDITED)

       Pada tahun 2014 dan 2015, Perusahaan menerima                                    In 2014 and 2015, the non-cash assets of a division
       setoran modal non-kas (inbreng) dari entitas induk                               of the Company’s Parent Company (WSKT) was
       (WSKT). Transaksi ini merupakan kombinasi bisnis                                 transferred to the Company. These transactions
       entitas sepengendali. Perusahaan mencatat selisih                                constitute a business combination involving entities
       antara nilai wajar aset tetap dan persediaan yang                                under common control. The Company recorded the
       dialihkan dengan nilai tercatatnya pada pos                                      difference between the fair value of assets of the
       tambahan modal disetor dengan rincian sebagai                                    division transferred and their carrying amount as part
       berikut:                                                                         of additional paid-in capital with details as follows:

                                                Nilai Tercatat/             Nilai Wajar/                     Selisih/
                                               Carrying Amount              Fair Value                      Difference
                                                      Rp                         Rp                             Rp

       Tanah                                       18.336.222.851           79.744.000.000                (61.407.777.149)                                Land
       Gedung                                      45.827.683.787           46.248.000.000                   (420.316.213)                             Buliding
       Peralatan                                  154.409.555.664          164.404.000.000                 (9.994.444.336)                          Equipment
       Kendaraan                                        9.654.688              113.000.000                   (103.345.312)                              Vehicle
       Persediaan                                  29.073.677.059           30.702.000.000                 (1.628.322.941)                          Inventories
       Jumlah                                     247.656.794.048          321.211.000.000                (73.554.205.952)                                 Total

24. SAHAM DIPEROLEH KEMBALI                                                         24. TREASURY STOCKS

   Berdasarkan Akta (RUPSLB) No. 59 tanggal                                            Based on Deed of EGMS No. 59 dated July 26, 2017,
   26 Juli 2017, Undang-Undang Nomor 40 Tahun 2007                                     Law Number 40 Year 2007 Article 37 regarding
   tentang     Perusahaan    Terbatas    Pasal     37                                  Limited Liability Company (“Law No. 40 Year 2007”)
   (“UU No. 40 Tahun 2007”) dan lampiran Keputusan                                     and Attachment of Decree of Chairman of Capital
   Ketua Badan Pengawas Pasar Modal dan Lembaga                                        Market Supervisory Agency and Financial Institution
   Keuangan No. KEP-105/BL/2010 Peraturan XI.B.2:                                      No. KEP-105/BL/2010 of Regulation XI.B.2:
   Pembelian Kembali Saham Yang Dikeluarkan Oleh                                       Repurchase of Shares Issued by Issuers or Public
   Perusahaan atau Perusahaan Publik, Perusahaan                                       Companies, the Company decided to conduct shares
   memutuskan untuk melaksanakan pembelian                                             buyback up to a maximum of 7% of subscribed and
   kembali saham (buyback) maksimum sebesar 7%                                         paid-up shares or 1,845,281,000 shares with a
   dari seluruh saham yang telah dikeluarkan dan                                       buyback period of 18 months from July 27, 2017 until
   disetor penuh atau sebesar 1.845.281.000 saham                                      January       27,     2019.    Based       on     POJK
   dengan periode buyback selama 18 bulan sejak                                        No. 30/POJK.04/2017 dated June 21, 2017, Article
   tanggal 27 Juli 2017 sampai dengan tanggal                                          15, the transfer of shares takes a maximum period of
   27 Januari 2019. Sesuai POJK No. 30/POJK.04/2017                                    3 years from the completion of the buyback, and is
   tanggal 21 Juni 2017, Pasal 15, Pengalihan saham                                    obliged to transfer shares from the buyback within 2
   dilakukan jangka waktu paling lama 3 tahun sejak                                    years. Under Article 16, if the transfer cannot be
   selesainya buyback, dan wajib melakukan                                             completed then it will get an additional time of 1 year,
   pengalihan saham hasil buyback dalam waktu 2                                        so that the total time becomes 6 years, and will expire
   tahun. Pada pasal 16, apabila pengalihan tersebut                                   on January 8, 2024.
   belum dapat diselesaikan maka akan mendapatkan
   penambahan waktu lagi 1 tahun, sehingga total waktu
   menjadi 6 tahun, akan berakhir pada tanggal
   8 Januari 2024.

   Saham yang diperoleh kembali tersebut dicatat pada                                  Reacquired shares are recorded at cost and are
   biaya perolehan dan disajikan sebagai pengurang                                     presented as deduction from equity with the following
   akun modal sebagai berikut:                                                         details:

                                                                  Jumlah saham/        Nilai perolehan
                                                                    Number of              kembali/
                              Uraian                                 shares            Buyback value                               Description

   Periode buyback saham Perusahaan                                                                                                  The Company's buyback period
     terhitung sejak tanggal 27 Juli 2017 sampai dengan                                                                                     from July 27, 2017 until
     tanggal 30 Juni 2023, 31 Desember 2022 dan 30 Juni 2022        1.845.281.000      775.953.722.340         June 30, 2023, December 31, 2022 and June 30, 2022

                                                                        112
Page 116
                                                                                                               The original financial statements included herein are in
                                                                                                                                             the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                                             PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                                                     NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                                           JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                                        30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                                           ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                                          (UNAUDITED)

25. SALDO LABA                                                                           25. RETAINED EARNINGS

                                                     30 Juni/                31 Desember/                  30 Juni/
                                                     June 30,                December 31                   June 30,
                                                       2023                      2022                        2022
                                                        Rp                        Rp                          Rp
   Telah ditentukan Penggunaannya                                                                                                                                 Appropriated
   Saldo Awal                                       272.173.444.924             272.173.444.924            272.173.444.924                                Beginning Balance
   Penambahan Dana Cadangan                                       --                          --                         --                       Addition on Reserved Fund
                                                    272.173.444.924             272.173.444.924            272.173.444.924


   Belum ditentukan Penggunaannya                                                                                                                              Unappropriated
   Saldo Awal                                    (8.462.237.614.484)        (9.137.558.180.060)         (9.137.558.180.060)                                   Beginning Balance
   Laba (Rugi) Bersih Periode Berjalan             (263.760.697.631)            675.769.677.491           1.427.732.833.242                          Profit (Loss) for the Period
   Pengukuran Kembali Kewajiban Imbalan Kerja                     --              (449.111.915)               2.117.375.695   Remeasurement of Defined Benefit Obligation
   Saldo Akhir                                   (8.725.998.312.115)        (8.462.237.614.484)         (7.707.707.971.123)                                    Ending Balance




26. PENDAPATAN USAHA                                                                     26. REVENUES

                                                                        30 Juni/             30 Juni/
                                                                        June 30,             June 30,
                                                                          2023                 2022
                                                                           Rp                   Rp

   Berdasarkan Produk                                                                                                                                            By Product
   Readymix dan Quarry                                                 308.328.273.918     146.838.920.483                                               Readymix and Quarry
   Precast                                                             195.950.561.759     295.101.285.837                                                           Precast
   Jasa konstruksi                                                     137.399.551.288     301.848.701.953                                                      Construction
   Jumlah                                                              641.678.386.965     743.788.908.273                                                                Total



                                                                        30 Juni/             30 Juni/
                                                                        June 30,             June 30,
                                                                          2023                 2022
                                                                           Rp                   Rp

   Berdasarkan Pelanggan                                                                                                                                         By Customers
   Pihak Berelasi (Catatan 37)                                                                                                                        Related Parties (Note 37)
      PT Waskita Karya (Persero) Tbk                                   343.840.255.828      411.258.164.816                                 PT Waskita Karya (Persero) Tbk
      PT Cimanggis Cibitung Tollways                                    85.575.565.080       83.561.526.419                                 PT Cimanggis Cibitung Tollways
      Adhi-Minarta KSO                                                  56.584.800.000                    --                                               Adhi-Minarta KSO
      PT Hutama Karya (Persero)                                         23.338.930.509                    --                                     PT Hutama Karya (Persero)
      Waskita - Nindya - Modern KSO                                     13.687.881.500                    --                                 Waskita - Nindya - Modern KSO
      Waskita - Basuki JO                                               10.574.695.000                    --                                            Waskita - Basuki JO
      PT Pembangunan Perumahan (Persero) Tbk                             6.796.184.600       10.940.528.600                      PT Pembangunan Perumahan (Persero) Tbk
      Waskita Karya - Ricky Kencana Sukses KSO                           5.235.061.500                    --                     Waskita Karya - Ricky Kencana Sukses KSO
      Waskita Karya - Basuki Rahmanta PU                                 4.408.130.000                    --                          Waskita Karya - Basuki Rahmanta PU
      Waskita - Utama KSO                                                4.196.447.505                    --                                           Waskita - Utama KSO
      Waskita - Guntur KSO                                               4.168.166.438                    --                                           Waskita - Guntur KSO
      Wika - Hutama KSO                                                  2.839.200.000                    --                                            Wika - Hutama KSO
      PT Brantas Abipraya (Persero)                                      2.276.524.500           33.373.300                                   PT Brantas Abipraya (Persero)
      PT Hakaaston                                                       2.255.238.500       24.686.914.100                                                    PT Hakaaston
      Shimizu - Adhi Karya                                               1.510.909.197                    --                                            Shimizu - Adhi Karya
      Waskita - SMJ - Utama KSO                                          1.239.983.000                    --                                     Waskita - SMJ - Utama KSO
      PP - Utama KSO                                                     1.230.562.500                    --                                                PP - Utama KSO
      PT Adhi Karya (Persero) Tbk                                          829.808.350        1.682.927.980                                     PT Adhi Karya (Persero) Tbk
      KSO Waskita Bersama Vision First                                     335.760.270       22.559.821.534                               KSO Waskita Bersama Vision First
      Waskita - HK - BRP KSO                                                         --       1.528.623.370                                        Waskita - HK - BRP KSO
      PT Kresna Kusuma Dyandra Marga                                                 --      39.496.618.935                              PT Kresna Kusuma Dyandra Marga
      PT PP Presisi                                                                  --       3.620.376.000                                                    PT PP Presisi
      PT Adhi Persada Beton                                                          --       1.084.711.904                                          PT Adhi Persada Beton
      PP DIU KSO                                                                     --       2.269.440.000                                                     PP DIU KSO
      Lain-lain (Dibawah Rp1 Milyar)                                     5.570.285.337        2.382.494.800                                        Others (Below Rp1 Billion)
   Jumlah Pihak Berelasi                                               576.494.389.614      605.105.521.758                                              Total Related Parties




                                                                           113
Page 117
                                                                                                The original financial statements included herein are in
                                                                                                                              the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                             PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                                     NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                           JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                        30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                           ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                          (UNAUDITED)

                                                           30 Juni/           30 Juni/
                                                           June 30,           June 30,
                                                             2023               2022
                                                              Rp                 Rp

   Pihak Ketiga                                                                                                                                  Third Parties
      PT Duta Graha Karya                               13.416.786.304        18.296.470.382                                           PT Duta Graha Karya
      PT Gunakarya Nusantara                             7.425.425.000                     --                                     PT Gunakarya Nusantara
      Yasa Patria Perkasa                                5.182.500.000                     --                                           Yasa Patria Perkasa
      PT Hans Enjiniring Dan Konstruksi                  4.609.000.000                     --                            PT Hans Enjiniring Dan Konstruksi
      PT Hijau Lestari Raya Fibreboard                   2.456.298.000                     --                             PT Hijau Lestari Raya Fibreboard
      PT Sumber Urip Sejati                              2.292.500.000         1.210.410.753                                         PT Sumber Urip Sejati
      PT Rama Mutiara Hafidz                             2.067.000.000                     --                                      PT Rama Mutiara Hafidz
      PT Riau Andalan Pulp & Paper                       2.043.360.000                     --                               PT Riau Andalan Pulp & Paper
      Sumber Sinar KSO                                   1.959.052.500                     --                                            Sumber Sinar KSO
      PT Riau Andalan Pulp & Paper                       1.671.840.000                     --                               PT Riau Andalan Pulp & Paper
      PT Banyuasin Industri Lestari                      1.295.757.000                     --                                 PT Banyuasin Industri Lestari
      PT Sasmito                                         1.212.120.000                     --                                                   PT Sasmito
      PT Indo Bharat Rayon                               1.158.389.500                     --                                         PT Indo Bharat Rayon
      PT Adira Makmur Abadi                              1.144.850.700                     --                                       PT Adira Makmur Abadi
      CV Praja Perkasa Bersatu                           1.079.467.240           334.870.000                                     CV Praja Perkasa Bersatu
      PT Peteka Karya Jala                               1.024.505.378         2.338.091.795                                          PT Peteka Karya Jala
      PT Panahome Deltamas Indonesia                       623.296.400         5.468.671.286                             PT Panahome Deltamas Indonesia
      PT Kukuh Mandiri Lestari                             374.320.000         4.968.667.420                                      PT Kukuh Mandiri Lestari
      PT Kapuk Naga Indah                                  372.089.400        28.591.952.907                                          PT Kapuk Naga Indah
      PT Nusa Raya Cipta, TBk                               38.208.650         1.739.028.800                                     PT Nusa Raya Cipta, TBk
      PT Inti Karya Persada Tehnik                          53.306.100         2.212.074.600                                  PT Inti Karya Persada Tehnik
      PT Semen Indogreen Sentosa                                     --        6.433.407.500                                 PT Semen Indogreen Sentosa
      PT Bumi Serpong Damai                                          --        5.700.000.000                                      PT Bumi Serpong Damai
      PT Rekagunatek Persada                                         --        4.872.411.100                                     PT Rekagunatek Persada
      Kine Project JO                                                --        4.769.393.432                                                Kine Project JO
      KSO STC NRC                                                    --        3.540.420.000                                                KSO STC NRC
      Indonesia Pondasi Raya                                         --        1.132.560.000                                       Indonesia Pondasi Raya
      Jayapattra - Cakrawala KSO                                     --        1.074.527.900                                   Jayapattra - Cakrawala KSO
      PT Hein Global Utama                                           --        2.034.381.000                                          PT Hein Global Utama
      PT Penta Ocean Construction                                    --        2.203.550.000                                 PT Penta Ocean Construction
      Hasta Prajatama                                                --        1.676.400.000                                               Hasta Prajatama
      Indo Karya Elektrik Mandiri                                    --        1.676.400.000                                    Indo Karya Elektrik Mandiri
      Encona Inti Industri                                           --        5.687.450.000                                             Encona Inti Industri
      Lainnya (di bawah Rp 1 Miliar)                    13.683.925.179        32.722.247.640                                     Others (below Rp1 Billion)
   Jumlah Pihak Ketiga                                  65.183.997.351       138.683.386.515                                              Total Third Parties
   Jumlah                                              641.678.386.965       743.788.908.273                                                            Total


   Rincian pemberi kerja dengan nilai kontribusi                              Details of revenues from project owners which
   pendapatan melebihi 10% dari total pendapatan                              represents more than 10% of the total revenues for
   usaha Perusahaan untuk tahun-tahun yang berakhir                           the years ended June 30, 2023, and 2022 are as
   30 Juni 2023 dan 2022 sebagai berikut:                                     follows:

                                                           30 Juni/           30 Juni/
                                                           June 30,           June 30,
                                                             2023               2022
                                                              Rp                 Rp

   PT Waskita Karya (Persero) Tbk                      343.840.255.828       411.258.164.816                                  PT Waskita Karya (Persero) Tbk
   PT Cimanggis Cibitung Tollways                       85.575.565.080        83.561.526.419                                  PT Cimanggis Cibitung Tollways
   Jumlah                                              429.415.820.908       494.819.691.235                                                            Total



27. BEBAN POKOK PENDAPATAN                                            27. COST OF REVENUES
                                                30 Juni/                    30 Juni/
                                                June 30,                    June 30,
                                                  2023                        2022
                                                   Rp                          Rp

   Persediaan Barang Jadi Awal                  141.300.668.890              252.634.588.132                    Beginning Balance of Finished Goods
   Beban Pokok Produksi                         448.945.498.802              423.539.609.411                            Cost of Goods Manufactured
   Persediaan Barang Jadi Akhir (Catatan 8)   (172.714.991.795)            (304.235.266.809)              Ending Balance of Finished Goods (Notes 8)
   Beban Pokok Penjualan                       417.531.175.897              371.938.930.734                                        Cost of Goods Sold

   Beban Bahan Baku                            382.052.405.410              335.245.654.375                                          Raw Material Costs
   Beban Tenaga Kerja                            8.639.106.968                8.837.190.513                                               Labour Costs
   Beban Overhead                               26.839.663.519               27.856.084.846                                            Overhead Costs
   Beban Pokok Penjualan                       417.531.175.897              371.938.929.734                                        Cost of Goods Sold
   Beban Jasa Konstruksi                       127.510.067.968              267.368.471.414                           Cost of Construction Services
   Beban Pokok Pendapatan                      545.041.243.865              639.307.401.148                                          Cost of Revenues



                                                             114
Page 118
                                                                                             The original financial statements included herein are in
                                                                                                                           the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                          PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                                  NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                        JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                     30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                        ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                       (UNAUDITED)

   Tidak terdapat pembelian bahan baku dari vendor                             There are no purchases of raw materials from
   yang melebihi 10% dari total beban pokok                                    vendors which represents more than 10% of the
   pendapatan Perusahaan untuk tahun-tahun yang                                total cost of revenues for the years ended
   berakhir 30 Juni 2023 dan 2022                                              June 30, 2023 and 2022.

28. BEBAN PENJUALAN                                                   28. SELLING EXPENSES

                                                           30 Juni/June 30,
                                                    2023                       2022
                                                     Rp                         Rp

   Beban Penjualan                                                                                                                   Selling Expenses
   Beban Pemasaran                                 39.197.243.392         40.667.623.957                                             Marketing Expense
   Beban Iklan                                        625.757.441            640.682.972                                            Advertising Expense
   Jumlah                                          39.823.000.833         41.308.306.929                                                            Total



29. BEBAN UMUM DAN ADMINSTRASI                                        29. GENERAL AND ADMINISTRATIVE EXPENSES

                                                            30 Juni/June 30,
                                                     2023                       2022
                                                      Rp                         Rp
   Provisi (Pemulihan) atas                                                                                                        Provision (Reversal) of
     Penurunan Nilai (Catatan 6 dan 9)                                                                                Impairment Losses (Notes 6 and 9)
     Piutang Usaha dan                                                                                                           Account Receivables and
     Tagihan Bruto                                  23.526.439.225        314.633.871.442                              Gross Amount Due from Customers
     Persediaan                                     40.581.306.447                      --                                                      Inventories
     Aset Tetap                                     36.302.178.368                      --                           Property, Plant, and Equipment - Net
   Beban Produksi Tidak Teralokasi                  86.386.621.527         95.748.758.272                               Unallocated Production Expenses
   Beban Pegawai                                    60.752.454.208         53.030.139.508                                              Employee Expense
   Beban Penyusutan (Catatan 12)                    35.805.007.029          1.147.275.227                                Depreciation Expense (Notes 12)
   Beban Umum                                       20.708.163.617         54.632.642.066                                                General Expense
   Beban Amortisasi Aset Lainnya (Catatan 14)        6.650.088.082          7.282.146.744                Amortization of Other Asset Expenses (Note 14)
   Beban Gedung                                      6.070.302.924          5.549.438.282                                                Building Expense
   Beban Amortisasi Sewa Guna Usaha (Catatan 13)     4.487.141.367          5.280.786.237           Amortization of Right of Use Asset Expenses(Note 13)
   Beban Kantor                                      3.972.652.589          2.999.073.264                                                  Office Expense
   Beban Perjalanan/Kendaraan                        3.428.164.365          5.048.197.921                                         Travel/Vehicle Expense
   Beban Lainnya                                     3.749.571.344          1.551.660.669

   Jumlah                                          332.420.091.092        546.903.989.632                                                            Total


   Beban produksi tidak teralokasi merupakan beban                             Unallocated production expenses represent general
   umum dan administrasi unit bisnis yang tidak                                and administrative expenses of a business unit that
   berdampak secara langsung terhadap proses                                   does not have a direct impact on the production
   produksi seperti beban gaji, beban jamuan tamu,                             process such as salary expenses, guest expenses,
   beban operasional, pembelian bahan bakar                                    operational expenses, purchase of vehicle fuel and
   kendaraan dan lain-lain.                                                    others.

30. BEBAN NON-CONTRIBUTING PLANT                                      30. NON-CONTRIBUTING PLANT EXPENSES

   Beban non-contributing plant merupakan evaluasi                             Non-contributing plant expenses represent abnormal
   atas jumlah normal atau tidak normal atas                                   amounts of wasted materials, labor or other product
   pemborosan biaya produksi, yang meliputi jumlah                             costs, storage costs unless these costs are required
   yang tidak normal atas pemborosan bahan, tenaga                             in the production process before proceeding to the
   kerja atau biaya produk lainnya, biaya penyimpanan                          next production stage, and general and administrative
   kecuali biaya tersebut diperlukan dalam proses                              costs, which do not contribute to making the inventory
   produksi sebelum dilanjutkan pada tahap produksi                            in its current condition and location. Total expenses
   selanjutnya, biaya administrasi dan umum yang tidak                         for     the    years    ended     June    30,    2023
   memberikan kontribusi untuk membuat persediaan                              and 2022 amounted to Rp166,348,854,745 and
   berada dalam kondisi dan lokasi saat ini. Jumlah                            Rp145,970,025,395, respectively.
   beban untuk tahun-tahun yang berakhir pada
   30 Juni 2023 dan 2022 masing-masing sebesar
   Rp166.348.854.745 dan Rp145.970.025.395.
                                                      115
Page 119
                                                                                           The original financial statements included herein are in
                                                                                                                         the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                         PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                                 NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                       JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                    30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                       ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                      (UNAUDITED)

31. PENDAPATAN BUNGA                                                 31. INTEREST INCOME

                                                            30 Juni/June 30,
                                                     2023                      2022
                                                      Rp                        Rp
   Jasa Giro                                        1.308.208.713               659.953.627                                     Current Accounts
   Deposito Berjangka                                  32.521.915                         --                                      Time Deposits
   Jumlah                                           1.340.730.628               659.953.627                                                 Total



32. PENDAPATAN LAIN-LAIN - BERSIH                                    32. OTHER INCOME - NET

                                                            30 Juni/June 30,
                                                     2023                      2022
                                                      Rp                        Rp

   Keuntungan atas modifikasi utang               328.712.924.251      2.380.844.226.477                             Gain on modification of debt
   Lain-Lain - bersih                              (2.278.706.890)       (36.727.285.369)                                           Others - net
   Jumlah                                         326.434.217.361      2.344.116.941.108                                                    Total



33. BEBAN KEUANGAN                                                   33. FINANCE CHARGES

                                                          30 Juni/June 30,
                                                      2023                 2022
                                                       Rp                   Rp

   Beban Bunga dari Utang:                                                                                                    Interest Expense on:
     Utang Bank                                                                                                                     Bank Loans
        Biaya pinjaman                              90.489.739.825      181.345.599.464                                         Borrowing costs
        Amortisasi biaya transaksi (Catatan 15)     44.264.485.548                    --             Amortization of transaction costs (Note 15)
     Utang Obligasi                                                                                                              Bonds Payable
        Biaya pinjaman                               3.266.064.565       98.000.000.000                                         Borrowing costs
        Amortisasi biaya transaksi (Catatan 21)      8.379.962.098                    --             Amortization of transaction costs (Note 21)
     Lainnya                                         2.290.251.325              630.094                                                  Others
   Jumlah                                          148.690.503.360      279.346.229.558                                                     Total



34. PAJAK PENGHASILAN                                                34. INCOME TAX

   Pendapatan pajak tangguhan Perusahaan untuk                             Income tax expense of the Company for years ended
   tahun-tahun yang berakhir pada 30 Juni 2023 dan                         June 30, 2023 and 2022 is nil.
   2022 adalah nihil.

   Rekonsiliasi antara laba sebelum pajak menurut                          Reconciliation between profit (loss) before tax per
   laporan laba rugi dan penghasilan komprehensif lain                     statements of profit or loss and other comprehensive
   dengan laba kena pajak adalah sebagai berikut:                          income and fiscal loss income is as follows:




                                                             116
Page 120
                                                                                  The original financial statements included herein are in
                                                                                                                the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                 PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                         NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022               JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                            30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                               ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                              (UNAUDITED)

                                                         30 Juni/June 30
                                                  2023                     2022
                                                   Rp                       Rp

   Laba (Rugi) Sebelum Pajak                  (263.760.697.631)     1.427.732.833.242                           Profit (Loss) Before Tax

   Perbedaan Waktu                                                                                                Timing Differences
     Penyisihan kerugian piutang usaha         100.385.819.274        314.633.871.443                 Allowance for Impairment Loss
     Liabilitas imbalan kerja                      183.720.579          2.081.741.482                            Employee Benefits

   Jumlah                                      100.569.539.853        316.715.612.925                                              Total

   Perbedaan Tetap                                                                                            Permanent Differences
     Gaji dan tunjangan                                       --         2.892.490.148                          Employee expenses
     Beban kantor                                   184.918.850          2.479.652.456                              Office expenses
     Pendapatan bunga                           (1.081.032.792)          (554.645.408)                              Interest income
     Beban representasi                                       --            32.687.788                       Representation expense
     Sumbangan                                      518.415.053            571.401.189                           Donation expenses
     Pendapatan jasa konstruksi                  60.862.253.008        159.371.887.934                          Construction income
     Pendapatan lain-lain                     (272.338.764.458)    (2.248.487.541.057)                                 Other income
   Jumlah                                     (211.854.210.339)    (2.083.694.066.950)                                             Total
   Rugi Kena Pajak                            (375.045.368.117)      (339.245.620.783)                                      Fiscal Loss

   Kompensasi Rugi Fiskal                                                                                 Fiscal Losses Carryforward
     Juni 2023                                (375.045.368.117)                         --                                 June 2023
     2022                                     (557.761.630.412)      (339.245.620.783)                                           2022
     2021                                     (730.194.666.410)      (730.194.666.410)                                           2021
     2020                                     (856.320.160.345)      (856.320.160.345)                                           2020

   Akumulasi Rugi Fiskal                    (2.519.321.825.284)    (1.925.760.447.538)                    Accumulated Fiscal Losses
   Uang muka pajak                                                                                                         Prepaid Tax
       Pajak Penghasilan pasal 22                1.419.334.452             9.679.410.116                          Income Tax Article 22
       Pajak Penghasilan pasal 23                             --             49.716.664                           Income Tax Article 23
       Pajak Penghasilan pasal 28A                            --       18.817.960.064                           Income Tax Article 28A
   Jumlah pajak dibayar dimuka                   1.419.334.452         28.547.086.844                                Total Prepaid Tax
   Pajak Penghasilan Pasal 28A                   1.419.334.452         28.547.086.844                          Income Tax Article 28A



   Laba kena pajak hasil rekonsiliasi diatas menjadi               The taxable income resulting from the above
   dasar dalam pengisian SPT Tahunan PPh Badan.                    reconciliation is the basis for filling in the Annual
                                                                   Corporate Income Tax Return.
   Pajak Tangguhan                                                 Deffered Tax

   Perusahaan yang mempunyai perbedaan temporer                    The Company has deductible temporary differences
   dan akumulasi rugi fiskal yang dapat dikurangkan                and fiscal losses carryforward for which no deferred
   dimana tidak ada aset pajak penghasilan tangguhan               tax assets were recognized as management believes
   yang diakui sebagaimana manajemen berpendapat                   that the Company will not be able to generate
   bahwa Perusahaan tidak akan dapat menghasilkan                  sufficient future taxable profits to allow all or part of its
   laba kena pajak masa depan yang memadai untuk                   deferred tax assets to be utilized. Temporary
   memungkinkan seluruh atau sebagian aset pajak                   differences and fiscal losses carryforwad for which
   tangguhan untuk dimanfaatkan. Perbedaan temporer                deferred tax assets were not recognized and the
   dan akumulasi rugi fiskal yang aset pajak                       related deferred tax assets are as follows:


                                                     117
Page 121
                                                                                                            The original financial statements included herein are in
                                                                                                                                          the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                                         PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                                                 NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                                       JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                                    30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                                       ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                                      (UNAUDITED)

   tangguhannya diakui dan jumlah                         aset      pajak
   tangguhannya adalah sebagai berikut:

                                                 30 Juni/June 30, 2023                    31 Desember/December 31, 2022
                                                                   Aset Pajak                                Aset Pajak
                                       Dasar Pengenaan            Tangguhan/          Dasar Pengenaan        Tangguhan/
                                            Pajak/                Deffered Tax             Pajak/           Deffered Tax
                                          Tax Base                   Assets              Tax Base               Assets
                                              Rp                       Rp                    Rp                   Rp

   Penyisihan kerugian                                                                                                                       Allowance for impairment losses
      penurunan nilai                                    -                       -      3.631.185.604.960        798.860.833.091                             of receivables
   Penyisihan penurunan nilai                                                                                                           Allowance for decline in market value
      pasar dan keusangan persediaan        40.581.306.447           8.927.887.418         49.737.760.986         10.942.307.417           and obsolescence of inventories
   Penyisihan kerugian penurunan                                                                                                             Allowance for impairment losses
      nilai aset dalam pelaksanaan          36.302.178.368           7.986.479.241         57.035.602.069         12.547.832.455                   construction in progress
   Liabilitas Imbalan Kerja                 17.372.141.941           3.821.871.227         17.372.141.941          3.821.871.227                  Employee Benefit Liabilities
   Sewa                                      9.954.559.610           2.190.003.114          3.704.263.180            814.937.900                                       Leases
   Akumulasi rugi fiskal                 2.519.321.825.284         554.250.801.563      2.144.276.457.167        471.740.820.577                  Fiscal Losses Carryforward
   Jumlah                                2.623.532.011.650         577.177.042.563      5.903.311.830.303       1.298.728.602.667                                       Total


   Surat Ketetapan Pajak                                                                   Tax Assessment Letter

   Berikut ini adalah surat ketetapan berdasarkan hasil                                    The following is an assessment letter based on the
   Pemeriksaan atau Penelitian dari Direktorat Jenderal                                    results of the Audit or Research from the Directorate
   Pajak terhadap kewajiban perpajakan perusahaan                                          General of Taxation on company tax obligations in the
   dalam rangka pengajuan Restitusi Pajak Penghasilan                                      context of filing for Income Tax Restitution and Value
   dan Pajak Pertambahan Nilai tahun pajak 2020:                                           Added Tax during 2020:


                                           No. Surat Ketetapan Pajak/                                             Tanggal Penerbitan/
     No              Jenis/ Type              Tax Assessment No.                 Masa Pajak/ Tax Period            Publication Date                   Jumlah/ Total
            PPh Badan/
      1     Corporate Income Tax               00036/406/20/093/22                   Desember 2020                     13 Mei 2022                        24.032.121.738
            PPh Pasal 21/
      2     Tax Article 21                     00033/201/20/093/22                   Desember 2020                     13 Mei 2022                           (783.909.175)
            PPh Pasal 23/
      3     Tax Article 23                     00029/203/20/093/22                   Desember 2020                     13 Mei 2022                         (1.383.424.712)
            PPh Final Pasal 4 (2)/
      4     Tax Article 4 (2)                  00036/240/20/093/22                   Desember 2020                     13 Mei 2022                         (4.126.615.392)
            Pajak Pertambahan Nilai/
      5     Value Added Tax                    00207/207/20/093/22                    Januari 2020                     13 Mei 2022                         (1.338.450.778)
            Pajak Pertambahan Nilai/
      6     Value Added Tax                    00208/207/20/093/22                    Februari 2020                    13 Mei 2022                         (1.991.709.414)
            Pajak Pertambahan Nilai/
      7     Value Added Tax                    00209/207/20/093/22                     Maret 2020                      13 Mei 2022                         (1.581.549.321)
            Pajak Pertambahan Nilai/
      8     Value Added Tax                    00210/207/20/093/22                     April 2020                      13 Mei 2022                           (637.557.162)
            Pajak Pertambahan Nilai/
      9     Value Added Tax                    00211/207/20/093/22                      Mei 2020                       13 Mei 2022                           (888.485.288)
            Pajak Pertambahan Nilai/
     10     Value Added Tax                    00212/207/20/093/22                     Juni 2020                       13 Mei 2022                         (1.099.866.934)
            Pajak Pertambahan Nilai/
     11     Value Added Tax                    00213/207/20/093/22                      Juli 2020                      13 Mei 2022                           (493.688.200)
            Pajak Pertambahan Nilai/
     12     Value Added Tax                    00214/207/20/093/22                    Agustus 2020                     13 Mei 2022                           (814.448.360)
            Pajak Pertambahan Nilai/
     13     Value Added Tax                    00215/207/20/093/22                   September 2020                    13 Mei 2022                         (1.612.644.474)
            Pajak Pertambahan Nilai/
     14     Value Added Tax                    00216/207/20/093/22                    Oktober 2020                     13 Mei 2022                           (483.394.735)
            Pajak Pertambahan Nilai/
     15     Value Added Tax                    00217/207/20/093/22                       Nov-20                        13 Mei 2022                           (344.546.022)
            Pajak Pertambahan Nilai/
     16     Value Added Tax                    00218/207/20/093/22                   Desember 2020                     13 Mei 2022                           (243.288.489)
                                                                                                                                                            6.208.543.282


                                                                            118
Page 122
                                                                          The original financial statements included herein are in
                                                                                                        the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                               PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                       NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022             JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                          30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                             ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                            (UNAUDITED)

   Pada tanggal 22 Februari 2023, Perusahaan                    On February 22, 2023, the Company received the Tax
   menerima Putusan Pengadilan Pajak atas Pengajuan             Court's Decision on Submission of an Appeal against
   Banding terhadap hasil Pemeriksaan PPN Tahun                 the VAT Audit results for the 2018 Fiscal Year.
   Pajak 2018.

                                                                     Putusan Banding
           Masa        Tahun     Jenis                                                                   PPN terutang
   No.                                                                     PPN yang Terutang
           Pajak       Pajak     Pajak                  Nomor                                             berdasarkan
                                                                                Semula
                                                                                                        Putusan Banding
      1 April          2018      PPN        PUT-007105.16/2021/PP/M.XB             2.773.482.602              492.753.906
      2 Mei            2018      PPN        PUT-007106.16/2021/PP/M.XB             1.446.882.280              461.367.284
      3 Juni           2018      PPN        PUT-007107.16/2021/PP/M.XB             1.429.150.966            1.335.294.118
      4 Juli           2018      PPN        PUT-007108.16/2021/PP/M.XB             5.597.983.998            4.760.410.998
      5 Agustus        2018      PPN        PUT-007109.16/2021/PP/M.XB             1.082.601.168            1.082.601.168
      6 September      2018      PPN        PUT-007110.16/2021/PP/M.XB             1.527.401.162            1.527.401.162
      7 Oktober        2018      PPN        PUT-007111.16/2021/PP/M.XB             5.165.633.090            5.011.308.610
                                         Total                                    19.023.135.266           14.671.137.246

   Pada 13 Mei 2022, Perusahaan menerima surat                  On May 13, 2022, the Company received tax
   ketetapan pajak untuk tahun pajak yang berakhir              assessment letters for the fiscal year ended
   pada tanggal 31 Desember 2020 yang menyatakan                December 31, 2020 confirming overpayment of
   lebih bayar pajak penghasilan badan sebesar                  corporate income tax of Rp6,208,543,282 out of
   Rp6.208.543.282         dari    Rp24.174.392.710.            Rp24,174,392,710. The Company agreed with this
   Perusahaan menyetujui ketetapan ini dan menerima             assessment and received net refund amounting to
   pengembalian bersih sebesar Rp6.208.543.282 dan               Rp6,208,543,282 and recognized tax expense from
   juga mengakui beban pajak dari pemotongan pajak              tax penalty amounting to Rp17,823,578,456 on
   sebesar Rp17.823.578.456 pada 6 Juni 2022 yang               June 6, 2022 which is recorded in “other expenses”.
   dicatat pada “beban lain-lain”.
   Pengembalian Pendahuluan Kelebihan Pembayaran                Preliminary Refund of Tax Overpayment
   Pajak
   Berdasarkan Surat Keputusan Direktur Jenderal                Based on the Decree of the Director General of
   Pajak No. KEP-00110/SKPPKP/KPP.190403/2022                   Taxation No. KEP-00110/SKPPKP/KPP.190403/
   tanggal 24 Oktober 2022 tentang Pengembalian                 2022 dated October 24, 2022 concerning Preliminary
   Pendahuluan    Kelebihan  Pembayaran    Pajak                Refund of Value Added Tax Overpayment for the
   Pertambahan Nilai Masa Pajak November 2021                   November 2021 Tax Period amounting to
   sebesar Rp1.775.116.472, diputuskan diberikan                Rp1,775,116,472, it was decided to give a refund of
   pengembalian    kelebihan pembayaran    Pajak                the overpayment of Value Added Tax for November
   Pertambahan Nilai Masa November 2021 sebesar                 2021 amounting to Rp1,713,335,904.
   Rp1.713.335.904.
   Berdasarkan Surat Keputusan Direktur Jenderal                Based on the Decree of the Director General of Taxes
   Pajak      Nomor    KEP-00095/SKPPKP/WPJ.19/                 No.     KEP-00095/SKPPKP/WPJ.19/KP.0403/2022
   KP.0403/2022 tanggal 26 September 2022 tentang               dated September 26, 2022 concerning Preliminary
   Pengembalian Pendahuluan Kelebihan Pembayaran                Refund of Value Added Tax Overpayment for the
   Pajak Pertambahan Nilai Masa Pajak Desember                  December 2021 Tax Period of Rp3,632,483,644, it
   2021     sebesar  Rp3.632.483.644,  diputuskan               was decided to give a refund of the overpayment of
   diberikan pengembalian kelebihan pembayaran                  Value Added Tax for the December 2021 amounting
   Pajak Pertambahan Nilai Masa Desember 2021                   to Rp3,546,465,590.
   sebesar Rp3.546.465.590.
   Perubahan tarif pajak badan                                  Changes in tax rates
   Pada bulan Oktober 2021, Pemerintah Indonesia                In October 2021, the Government of Indonesia
   mengesahkan Undang-Undang No. 7 Tahun 2021                   approved the Law No. 7 Year 2021 (“Law No.
   (“UU No.7/2021”) tentang harmonisasi peraturan               7/2021”) related to harmonisation of tax regulations.
   perpajakan. Beberapa tujuan UU No.7/2021 adalah              Some purposes of Law No.7/2021 are to increase
   untuk meningkatkan pertumbuhan perekonomian                  sustainable economic growth and support the
   yang berkelanjutan dan mendukung percepatan                  acceleration of economic recovery, realize a tax
   pemulihan ekonomi, mewujudkan sistem perpajakan              system that is more just with legal certainty,
   yang lebih berkeadilan dan berkepastian hukum,               implement administrative reforms, consolidated
   melaksanakan reformasi administrasi, kebijakan               taxation policies, and expansion of the tax base, as
   perpajakan yang konsolidatif, dan perluasan basis            well as increasing Taxpayer voluntary compliance.
   pajak, serta meningkatkan kepatuhan sukarela Wajib
   Pajak.

                                                    119
Page 123
                                                                                     The original financial statements included herein are in
                                                                                                                   the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                     PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                             NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                   JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                   ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                  (UNAUDITED)

35. LABA (RUGI) PER SAHAM                                        35. EARNINGS (LOSS) PER SHARE

   Berikut adalah data yang digunakan untuk                            Data used for calculation of basic and diluted
   perhitungan laba (rugi) per saham dasar dan dilusian                earnings (loss) per share are as follows:
   sebagai berikut:

                                                           30 Juni/June 30 ,
                                                       2023                  2022
                                                        Rp                    Rp

   Laba (rugi) bersih periode berjalan             (263.760.697.631)   1.427.732.833.242                        Net profit (loss) for the periods
   Rata-rata tertimbang jumlah                                                                                  Weighted average number of
      saham biasa yang beredar                                                                                 outstanding common share
      yang digunakan dalam perhitungan                                                                           for purpose of basic and
       laba (rugi) per saham dasar dan dilusian      24.515.876.534      24.515.876.534                   diluted earning (loss) per share
   Laba (Rugi) Per Saham Dasar dan Dilusian                  (10,76)                58,24        Basic and Diluted Earnings (Loss) per Share



36. LIABILITAS IMBALAN PASCAKERJA                                36. EMPLOYEE BENEFITS OBLIGATIONS

   Perusahaan mengakui kewajiban imbalan kerja yang                    The Company recognized unfunded employee
   tidak didanai sesuai dengan Peraturan Pemerintah                    benefits liability in accordance with Government
   No. 35 Tahun 2021 (PP 35/2021) yang menerapkan                      Regulation No. 35 Year 2021 (PP 35/2021) that
   pengaturan Perppu No. 2/2022 tentang Cipta Kerja                    implement the provisions of Perppu No. 2/2022 on
   pada tahun 2022 dan Undang-undang No.11/2020                        Job Creation in 2022 and Law No. 11/2020 on Job
   tentang Cipta Kerja pada tahun 2021.                                Creation in 2021.

   Program pensiun imbalan pasti memberikan                            The defined benefit pension plan typically exposes
   eksposur Perusahaan terhadap risiko aktuarial                       the Company to actuarial risks such as interest rate
   seperti risiko tingkat bunga, risiko harapan hidup dan              risk, longevity risk and salary risk.
   risiko gaji.

   Risiko tingkat bunga                                                Interest risk

   Penurunan suku bunga obligasi akan meningkatkan                     A decrease in the bond interest rate will increase the
   liabilitas program.                                                 plan liability.

   Risiko harapan hidup                                                Longevity risk

   Nilai kini kewajiban imbalan pasti dihitung dengan                  The present value of the defined benefit plan liability
   mengacu pada estimasi terbaik dari mortalitas                       is calculated by reference to the best estimate of the
   peserta program baik selama dan setelah kontrak                     mortality of plan participants both during and after
   kerja. Peningkatan harapan hidup peserta program                    their employment. An increase in the life expectancy
   akan meningkatkan liabilitas program.                               of the plan participants will increase the plan’s liability.

   Risiko gaji                                                         Salary risk

   Nilai kini kewajiban imbalan pasti dihitung dengan                  The present value of the defined benefit plan liability
   mengacu pada gaji masa depan peserta program.                       is calculated by reference to the future salaries of plan
   Dengan demikian, kenaikan gaji peserta program                      participants. As such, an increase in the salary of the
   akan meningkatkan liabilitas program itu.                           plan participants will increase the plan’s liability.

   Penilaian aktuaris atas estimasi manfaat karyawan                   Actuarial valuations of post-employment and other
   pasca kerja dan imbalan jangka panjang lainnya                      long-term benefits as at June 30, 2023 and December
   tanggal 30 Juni 2023 dan 31 Desember 2022,                          31, 2022 were conducted by the actuarial consulting
   dilakukan oleh perusahaan konsultan aktuaria                        firm    PT Praptasentosa       Gunajasa.    Actuarial
   PT Praptasentosa Gunajasa. Asumsi aktuarial pada                    assumptions as of June 30, 2023, and December 31,
   tanggal 30 Juni 2023 dan 31 Desember 2022 sebagai                   2022, were as follows:
   berikut:


                                                         120
Page 124
                                                                                                                      The original financial statements included herein are in
                                                                                                                                                    the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                                                  PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                                                          NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                                                JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                                             30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                                                ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                                               (UNAUDITED)

                                                      30 Juni/                        31 Desember/                      30 Juni/
                                                      June 30,                        December 31,                      June 30,
                                                        2023                              2022                            2022

   Tingkat Kematian                                  TMI IV 2019                      TMI IV 2019                     TMI IV 2019                                          Mortality Rate
   Tingkat Kenaikan Gaji - per Tahun                      5%                               5%                              5%                              Salary Increment per annum
   Tingkat Diskonto                                     7,87%                            7,57%                           7,87%                                            Discount Rate
   Umur pensiun normal (tahun)                            56                               56                              56                               Normal pension age (years)
   Tingkat cacat per tahun                       5,00% of TMI IV 2019             5,00% of TMI IV 2019            5,00% of TMI IV 2019                        Disability rate per annum
   Tingkat pengunduran diri                                                                                                                              Future pension increment rate
      20 tahun dan menurun secara linier                                                                                                               20 year and declining linearly
      sampai dengan usia 50 tahun                        2%                                 2%                              2%                                    until age 50 years

   Beban imbalan pasca kerja yang diakui pada laporan                                                  Amounts recognized in the statements of profit or loss
   laba rugi dan penghasilan komprehensif lain adalah                                                  and other comprehensive income in respect of these
   sebagai berikut:                                                                                    employee benefits are as follows:
                                                                             30 Juni/June 30 , 2023
                                                                                    Imbalan
                                                          Imbalan                pasti lainnya/
                                                          pensiun/             Other long-term            Jumlah/
                                                        Pension plan               benefits                Total
                                                             Rp                        Rp                   Rp

   Biaya jasa kini                                         2.844.446.697              450.297.054          3.294.743.751                                              Current service cost
   Biaya jasa lalu dan (keuntungan) kerugian                                                                                                             Past service cost and (gain) loss
     atas kurtailment dan penyelesaian                    (1.557.505.660)                        --       (1.557.505.660)                             from curtailment and settlement
   (Keuntungan) kerugian aktuarial atas OLTEB                           --           (697.468.208)          (697.468.208)                            Actuarial (gains) losses from OLTEB
   Beban bunga                                                904.401.736              202.831.555          1.107.233.291                                                 Interest expense
   Penyesuaian atas perubahan metode atribus              (5.168.349.444)                        --       (5.168.349.444)          Adjustment due to changes in attribution method
   Komponen dari biaya imbalan pasti yang                                                                                                         Components of defined benefits cost
     diakui dalam laba rugi                               (2.977.006.671)             (44.339.599)        (3.021.346.270)                              recognized in profit or loss

   Pengukuran kembali liabilitas imbalan                                                                                                             Remearsurement on the net defined
     pasti - neto                                                                                                                                                       benefit liability
     (Keuntungan) kerugian aktuarial yang                                                                                                         Actuarial (gains) losses arising from
       timbul dari perubahan asumsi demografik                165.572.059                        --          165.572.059                     changes in demographic assumptions
     (Keuntungan) kerugian aktuarial yang                                                                                                         Actuarial (gains) losses arising from
       timbul dari perubahan asumsi keuangan                  284.081.033                        --          284.081.033                         changes in financial assumptions
     (Keuntungan) kerugian aktuarial yang                                                                                                         Actuarial (gains) losses arising from
       timbul dari penyesuaian atas pengalaman                   (541.177)                       --            (541.177)                        changes in experience adjustment
   Komponen dari biaya imbalan pasti yang                                                                                                        Components of defined benefits cost
     diakui dalam komprehensif lain                           449.111.915                        --          449.111.915                   recognized other comprehensive income
   Jumlah                                                 (2.527.894.756)             (44.339.599)        (2.572.234.355)                                                           Total



                                                                    31 Desember/December 31 , 2022
                                                                               Imbalan
                                                          Imbalan           pasti lainnya/
                                                          pensiun/         Other long-term         Jumlah/
                                                        Pension plan           benefits             Total
                                                             Rp                   Rp                 Rp

   Biaya jasa kini                                          2.844.446.697              450.297.054          3.294.743.751                                              Current service cost
   Biaya jasa lalu dan (keuntungan) kerugian                                                                                                              Past service cost and (gain) loss
     atas kurtailment dan penyelesaian                    (1.557.505.660)                        --       (1.557.505.660)                              from curtailment and settlement
   (Keuntungan) kerugian aktuarial atas OLTEB                           --           (697.468.208)          (697.468.208)                             Actuarial (gains) losses from OLTEB
   Beban bunga                                                904.401.736              202.831.555          1.107.233.291                                                  Interest expense
   Penyesuaian atas perubahan metode atribus              (5.168.349.444)                        --       (5.168.349.444)          Adjustment due to changes in attribution method
   Komponen dari biaya imbalan pasti yang                                                                                                          Components of defined benefits cost
     diakui dalam laba rugi                               (2.977.006.671)             (44.339.599)        (3.021.346.270)                               recognized in profit or loss

   Pengukuran kembali liabilitas imbalan                                                                                                               Remearsurement on the net defined
     pasti - neto                                                                                                                                                         benefit liability
     (Keuntungan) kerugian aktuarial yang                                                                                                           Actuarial (gains) losses arising from
       timbul dari perubahan asumsi demografik                165.572.059              --                    165.572.059                      changes in demographic assumptions
     (Keuntungan) kerugian aktuarial yang                                                                                                           Actuarial (gains) losses arising from
       timbul dari perubahan asumsi keuangan                  284.081.033              --                    284.081.033                           changes in financial assumptions
     (Keuntungan) kerugian aktuarial yang                                                                                                           Actuarial (gains) losses arising from
       timbul dari penyesuaian atas pengalaman                   (541.177)                        --            (541.177)                changes in experience adjustment
   Komponen dari biaya imbalan pasti yang                                                                                                          Components of defined benefits cost
     diakui dalam komprehensif lain                           449.111.915                         --         449.111.915                    recognized other comprehensive income
   Jumlah                                                 (2.527.894.756)             (44.339.599)        (2.572.234.355)                                                             Total




                                                                                   121
Page 125
                                                                                                               The original financial statements included herein are in
                                                                                                                                             the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                                           PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                                                   NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                                         JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                                      30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                                         ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                                        (UNAUDITED)

   Mutasi nilai kini kewajiban imbalan pasti adalah                                             Movements in the present value of the defined benefit
   sebagai berikut:                                                                             obligation are as follows:

                                                                      30 Juni/June 30 , 2023
                                                                             Imbalan
                                                   Imbalan                pasti lainnya/
                                                   pensiun/             Other long-term             Jumlah/
                                                 Pension plan               benefits                 Total
                                                      Rp                        Rp                    Rp

   Kewajiban imbalan pasti - awal                  17.264.963.410             2.679.412.886         19.944.376.296                            Opening defined benefit obligation
   Biaya jasa kini                                  2.844.446.697               450.297.054          3.294.743.751                                           Current service cost
   Biaya jasa lalu dan (keuntungan) kerugian                                                                                                    Past service cost and (gain) loss
     atas kurtailment dan penyelesaian             (1.557.505.660)                         --       (1.557.505.660)                          from curtailment and settlement
   (Keuntungan) kerugian aktuarial atas OLTEB                    --            (697.468.208)          (697.468.208)                         Actuarial (gains) losses from OLTEB
   Beban bunga                                         904.401.736               202.831.555          1.107.233.291                                              Interest expense
   Penyesuaian atas perubahan metode atribus       (5.168.349.444)                         --       (5.168.349.444)         Adjustment due to changes in attribution method
   Pengukuran kembali (keuntungan) kerugian:                                                                                                     Remearsurement (gains) losses:
     (Keuntungan) kerugian aktuarial yang                                                                                                 Actuarial (gains) losses arising from
       timbul dari perubahan asumsi demografik        165.572.059                          --          165.572.059                   changes in demographic assumptions
     (Keuntungan) kerugian aktuarial yang                                                                                                 Actuarial (gains) losses arising from
       timbul dari perubahan asumsi keuangan          284.081.033                          --          284.081.033                       changes in financial assumptions
     (Keuntungan) kerugian aktuarial yang                                                                                                 Actuarial (gains) losses arising from
       timbul dari penyesuaian atas pengalaman           (541.177)                         --             (541.177)                     changes in experience adjustment
   Kewajiban imbalan pasti - akhir                 14.737.068.654             2.635.073.287         17.372.141.941                          Closing defined benefit obligation


                                                             31 Desember/December 3 1, 2022
                                                                        Imbalan
                                                   Imbalan           pasti lainnya/
                                                   pensiun/         Other long-term         Jumlah/
                                                 Pension plan           benefits             Total
                                                      Rp                   Rp                 Rp

   Kewajiban imbalan pasti - awal                  17.264.963.410             2.679.412.886         19.944.376.296                            Opening defined benefit obligation
   Biaya jasa kini                                  2.844.446.697               450.297.054          3.294.743.751                                           Current service cost
   Biaya jasa lalu dan (keuntungan) kerugian                                                                                                    Past service cost and (gain) loss
     atas kurtailment dan penyelesaian             (1.557.505.660)                         --       (1.557.505.660)                          from curtailment and settlement
   (Keuntungan) kerugian aktuarial atas OLTEB                    --            (697.468.208)          (697.468.208)                         Actuarial (gains) losses from OLTEB
   Beban bunga                                         904.401.736               202.831.555          1.107.233.291                                              Interest expense
   Penyesuaian atas perubahan metode atribus       (5.168.349.444)                         --       (5.168.349.444)         Adjustment due to changes in attribution method
   Pengukuran kembali (keuntungan) kerugian:                                                                                                     Remearsurement (gains) losses:
     (Keuntungan) kerugian aktuarial yang                                                                                                 Actuarial (gains) losses arising from
       timbul dari perubahan asumsi demografik        165.572.059                          --          165.572.059                   changes in demographic assumptions
     (Keuntungan) kerugian aktuarial yang                                                                                                 Actuarial (gains) losses arising from
       timbul dari perubahan asumsi keuangan          284.081.033                          --          284.081.033                       changes in financial assumptions
     (Keuntungan) kerugian aktuarial yang                                                                                                 Actuarial (gains) losses arising from
       timbul dari penyesuaian atas pengalaman           (541.177)                         --             (541.177)                     changes in experience adjustment
   Kewajiban imbalan pasti - akhir                 14.737.068.654             2.635.073.287         17.372.141.941                          Closing defined benefit obligation


                                                                      30 Juni/June 30 , 2022
                                                   Imbalan                   Imbalan
                                                   pensiun/             Other long-term            Jumlah/
                                                 Pension plan               benefits                Total
                                                      Rp                       Rp                    Rp

   Kewajiban imbalan pasti - awal                  17.264.963.410            2.679.412.886         19.944.376.296                            Opening defined benefit obligation
   Biaya jasa kini                                  1.723.746.638              217.563.914          1.941.310.552                                           Current service cost
   Biaya jasa lalu dan (keuntungan) kerugian                                                                                                   Past service cost and (gain) loss
     atas kurtailment dan penyelesaian                157.680.597                         --          157.680.597                           from curtailment and settlement
   (Keuntungan) kerugian aktuarial atas OLTEB                   --            (766.488.338)         (766.488.338)                          Actuarial (gains) losses from OLTEB
   Beban bunga                                        647.822.894               101.415.777           749.238.671                                               Interest expense
   Penyesuaian atas perubahan metode atribus                    --                        --                    --         Adjustment due to changes in attribution method
   Pengukuran kembali (keuntungan) kerugian:                                                                                                  Remearsurement (gains) losses:
     (Keuntungan) kerugian aktuarial yang                                                                                               Actuarial (gains) losses arising from
       timbul dari perubahan asumsi demografik            728.488                         --              728.488                  changes in demographic assumptions
     (Keuntungan) kerugian aktuarial yang                                                                       --                      Actuarial (gains) losses arising from
       timbul dari perubahan asumsi keuangan        (585.586.050)                         --        (585.586.050)                      changes in financial assumptions
     (Keuntungan) kerugian aktuarial yang                                                                                               Actuarial (gains) losses arising from
       timbul dari penyesuaian atas pengalaman     (1.532.518.133)                       --        (1.532.518.133)                    changes in experience adjustment
   Kewajiban imbalan pasti - akhir                 17.676.837.844            2.231.904.239         19.908.742.083                         Closing defined benefit obligation


                                                                            122
Page 126
                                                                            The original financial statements included herein are in
                                                                                                          the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                 PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                         NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022               JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                            30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                               ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                              (UNAUDITED)

   Asumsi aktuarial yang signifikan untuk penentuan              Significant    actuarial   assumptions       for  the
   kewajiban imbalan pasti adalah tingkat diskonto,              determination of the defined obligation are discount
   kenaikan gaji yang diharapkan dan mortalitas.                 rate, expected salary increase and mortality. The
   Sensitivitas analisis di bawah ini ditentukan                 sensitivity analyses below have been determined
   berdasarkan masing-masing perubahan asumsi yang               based on reasonably possible changes of the
   mungkin terjadi pada akhir periode pelaporan,                 respective assumptions occurring at the end of the
   dengan semua asumsi lain konstan.                             reporting period, while holding all other assumptions
                                                                 constant.

   •   Jika tingkat diskonto lebih tinggi (lebih rendah)         •   If the discount rate is 100% basis points higher
       100% basis poin, kewajiban imbalan pasti akan                 (lower), the defined benefit obligation would
       berkurang sebesar Rp1.240.434.493 (meningkat                  decrease by Rp1,240,434,493 (increase by
       sebesar)         Rp1.419.899.417            untuk             Rp1,419,899,417) for June 30, 2023 and for
       30 Juni 2023 dan untuk 31 Desember 2022.                      December 31, 2022. The defined benefit
       Kewajiban imbalan pasti akan berkurang                        obligation would decrease by Rp1,971,438,504
       sebesar Rp1.971.438.504 meningkat sebesar                     (increase by Rp2,367,119,723) for June 30,
       Rp2.367.119.723 untuk 30 Juni 2022.                           2022.

   •   Jika pertumbuhan gaji yang diharapkan naik                •   If the expected salary growth increases
       (turun) sebesar 100% basis poin, kewajiban                    (decreases) by 100% basis points, the
       imbalan     pasti   akan      naik    sebesar                 defined benefit obligation would increase
       Rp1.393.377.392         (turun        sebesar                 by       Rp1,393,377,392     (decrease    by
       Rp1.240.072.820) untuk 30 Juni 2023 dan untuk                 Rp1,240,072,820) for June 30, 2023, and for
       31 Desember 2022. Kewajiban imbalan pasti                     December 31, 2022. The defined benefit
       akan naik sebesar Rp2.412.513.447 (turun                      obligation would increase by Rp2,412,513,447
       sebesar Rp 2.037.805.294) untuk 30 Juni 2022                  (decrease by Rp2,037,805,294) for June 30,
                                                                     2022.

   •   Jika harapan hidup meningkat (turun) dalam satu           •   If the life expectancy increases (decreases) by
       tahun untuk pria dan wanita, kewajiban imbalan                one year for both men and women, the defined
       pasti akan meningkat nihil (turun sebesar                     benefit obligation would increase by nil (decrease
       nihil) untuk 30 Juni 2023 dan 31 Desember 2022.               by nil) for June 30, 2023, and for December 31,
       kewajiban imbalan pasti akan meningkat                        2022. the defined benefit obligation would
       Rp1.941.310.552            (turun       sebesar               increase by Rp1,941,310,552 (decrease by
       Rp1.941.310.552) untuk 30 Juni 2022                           Rp1,941,310,552) for June 30, 2022.

   Analisis sensitivitas yang disajikan di atas mungkin          The sensitivity analysis presented above may not be
   tidak mewakili perubahan yang sebenarnya dalam                representative of the actual change in the defined
   kewajiban imbalan pasti mengingat bahwa                       benefits obligation as it is unlikely that the change in
   perubahan asumsi terjadinya tidak terisolasi satu             assumptions would occur in isolation of one another
   sama lain karena beberapa asumsi tersebut mungkin             as some of the assumptions may be correlated.
   berkorelasi.

   Selanjutnya, dalam menyajikan analisis sensitivitas di        Furthermore, in presenting the above sensitivity
   atas, nilai kini kewajiban imbalan pasti dihitung             analysis, the present value of the defined benefits
   dengan menggunakan metode Projected Unit Credit               obligation has been calculated using the Projected
   pada akhir periode pelaporan, yang sama dengan                Unit Credit method at the end of the reporting period,
   yang diterapkan dalam menghitung kewajiban                    which is the same as that applied in calculating the
   imbalan pasti yang diakui dalam laporan posisi                defined benefits obligation recognized in the
   keuangan.                                                     statement of financial position.

   Tidak ada perubahan dalam metode dan asumsi yang              There was no change in the methods and
   digunakan dalam penyusunan analisis sensitivitas              assumptions used in preparing the sensitivity analysis
   dari tahun sebelumnya.                                        from prior years.
   Durasi rata-rata dari kewajiban imbalan pada tanggal          The average duration of the benefit obligation at June
   30 Juni 2023 dan 31 Desember 2022 masing-masing               30, 2023 and December 31, 2022 each 20.50 years.
   adalah 20,50 tahun.

37. SIFAT DAN TRANSAKSI PIHAK BERELASI                        37. NATURE AND TRANSACTIONS WITH RELATED
                                                                  PARTIES

   Sifat Pihak Berelasi:                                         Nature of Relationship:
                                                        123
Page 127
                                                                         The original financial statements included herein are in
                                                                                                       the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                               PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                       NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022             JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                          30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                             ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                            (UNAUDITED)


   a.   Pemerintah    Republik   Indonesia       adalah       a.   The Government of Indonesia is the ultimate
        pengendali utama Perusahaan.                               controlling party of the Company.

   b.   WSKT adalah entitas induk dan pemegang                b.   WSKT is the parent and majority shareholder of
        saham mayoritas Perusahaan.                                the Company.

   c.   Pihak yang pengendali utamanya sama dengan            c.   Parties which have the same ultimate controlling
        Perusahaan adalah BTN, BRI, BNI, Bank                      party as the Company are BTN, BRI, BNI, Bank
        Mandiri, BSI, Bank Raya, WBW, KSO Waskita                  Mandiri, BSI, Bank Raya, WBW, KSO Waskita
        Bersama Vision First, PT PP (Persero) Tbk,                 Bersama Vision First, PT PP (Persero) Tbk,
        Hutama Waskita KSO, PT Hakaaston, Waskita                  Hutama Waskita KSO, PT Hakaaston, Waskita
        Agung KSO, Waskita - Adhi KSO, KSO Waskita                 Agung KSO, Waskita - Adhi KSO, KSO Waskita
        Acset, Adhi Persada Beton, KSO Waskita - Wika,             Acset, Adhi Persada Beton, KSO Waskita - Wika,
        Waskita - HK - BRP KSO, JO MCC - WIKA -                    Waskita - HK - BRP KSO, JO MCC - WIKA -
        Nindya - Waskita, PT Perusahaan Pengelola                  Nindya - Waskita, PT Perusahaan Pengelola
        Aset, PP Presisi, PP DIU KSO dan Waskita - HK              Aset, PP Presisi, PP DIU KSO and Waskita - HK
        – BRP                                                      - BRP

   d. Manajemen kunci meliputi anggota Dewan                  d. Key     management       personnel     includes
        Komisaris dan Direksi Perusahaan.                          Commissioners and Directors of the Company.

   Transaksi-transaksi Pihak Berelasi                         Transactions with Related Parties

   Dalam kegiatan usahanya, Perusahaan melakukan              In the normal course of business, the Company
   transaksi tertentu dengan pihak berelasi, yang             entered into certain transactions with related parties,
   meliputi antara lain:                                      including the following:

   a.   Perusahaan menyediakan manfaat            pada        a.   The Company provides benefits to the
        Komisaris dan Direktur Perusahaan.                         Commissioners and Directors of the Company.

        Jumlah remunerasi yang diterima oleh Dewan                 The total remuneration received by the
        Komisaris untuk tahun-tahun yang berakhir                  Commissioners   for     the   years   ended
        30   Juni    2023   dan     2022    masing-                June 30, 2023, and 2022 amounted to
        masing    sebesar   Rp4.728.064.622    dan                 Rp4,728,064,622     and     Rp2,481,103,116,
        Rp2.481.103.116.                                           respectively.

        Jumlah remunerasi yang diterima oleh Direksi               The total remuneration received by the Directors
        untuk tahun-tahun yang berakhir 30 Juni 2023               for the years ended June 30, 2023, and 2022
        dan      2022     masing-masing      sebesar               amounted       to     Rp7,899,580,930       and
        Rp7.899.580.930 dan Rp3.920.532.330.                       Rp3,920,532,330, respectively.

   b.   Jumlah pendapatan usaha kepada pihak berelasi         b.   Total revenues to related parties constituted 90%
        sebesar 90% dan 81% dari jumlah pendapatan                 and 81%, respectively of the total net revenues
        masing-masing untuk tahun-tahun yang berakhir              for years ended June 30, 2023 and 2022,
        30 Juni 2023 dan 2022 merupakan penjualan                  respectively (Note 37). At reporting date, the
        kepada pihak berelasi (Catatan 37). Pada                   receivables from these revenues were presented
        tanggal pelaporan, piutang atas pendapatan                 as accounts receivable and gross amounts due
        tersebut dicatat sebagai bagian dari piutang               from customers, which constituted 18% and 14%
        usaha dan tagihan bruto, yang masing-masing                fot Account Receivables and 6% and 12% for
        meliputi 18% dan 14% untuk piutang usaha dan               Gross Amiunt Due from Customer, of the total
        6% dan 12% untuk tagihan bruto dari jumlah aset            assets as at June 30, 2023 and December 31,
        masing-masing pada tanggal 30 Juni 2023 dan                2022, respectively (Notes 6 and 9).
        31 Desember 2022 (Catatan 6 dan 9).

   c.   Perusahaan menandatangani perjanjian fasilitas        c.   The Company entered into working capital loan
        kredit modal kerja dengan BRI, BSI, Bank                   agreements with BRI, BSI, Bank Mandiri and BNI
        Mandiri dan BNI (Catatan 15).                              (Note 15).

   d.   Rincian saldo pihak-pihak     berelasi   adalah       d.   Details of outstanding account balances with
        sebagai berikut:                                           related parties are as follows:


                                                      124
Page 128
                                                                                                                                              The original financial statements included herein are in
                                                                                                                                                                            the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                                                                        PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                                                                                NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                                                                      JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                                                                   30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                                                                      ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                                                                     (UNAUDITED)

                                                          30 Juni/June 30 , 2023                       31 Desember/December 31 , 2022                30 Juni/June 30 , 2022
                                                                            % terhadap                                   % terhadap                                    % terhadap
                                                                           jumlah aset/                                  jumlah aset/                                 jumlah aset/
                                                         Rp             % to total assets                  Rp          % to total assets            Rp             % to total assets

         Aset                                                                                                                                                                                                                Assets

           Kas dan Setara Kas (Catatan 5)             51.368.680.049                   0,96%           178.448.953.356                2,99%     163.154.121.995                   2,50%     Cash and Cash Equivalents (Note 5)
           Piutang Usaha (Catatan 6)                 752.425.610.883                  14,05%           621.213.457.310               10,42%     745.822.974.420                  11,45% Trade Account Receivable - Net (Note 6)
           Piutang Lain-lain (Catatan 7)              17.791.338.563                   0,33%            17.050.686.215                0,29%       5.666.001.800                   0,09%             Other Receivables (Note 7)
           Tagihan Bruto -                                                                                                                                                                             Gross Amount due from
           Berelasi (Catatan 9)                       305.764.642.434                     5,71%         514.751.692.232               8,63%     460.732.521.403                   7,07%              customers - Net (Note 9)
         Jumlah                                     1.127.350.271.928                     21,0%       1.331.464.789.113              22,33%   1.375.375.619.618                   21,1%                                  Total


                                                          30 Juni/June 30 , 2023                      31 Desember/December 31, 2022                 30 Juni/June 30 , 2023
                                                                            % terhadap                                  % terhadap                                    % terhadap
                                                                        jumlah liabilitas/                            jumlah liabilitas/                          jumlah liabilitas/
                                                         Rp            % to total liabilities             Rp         % to total liabilities        Rp            % to total liabilities
         Liabilitas                                                                                                                                                                                                     Liabilities

           Utang Bank                                                                                                                                                                             Current Maturity of Long-Term
             Jangka Pendek (Catatan 15)                            --                     --                        --                   --                  --                     --                   Bank Loans (Note 15)
           Utang Usaha (Catatan 16)                   47.052.248.468                  0,61%            48.464.689.028                0,60%      59.715.817.761                  0,76%               Account Payables (Note 16)
           Utang lain-lain (Catatan 17)               20.260.904.180                  0,26%            17.951.130.090                0,22%      77.127.711.007                  0,98%                  Other Payables (Note 17)
           Uang Muka dari Pelanggan (Catatan 20)      40.676.246.251                  0,53%            32.436.064.714                0,40%      55.905.287.677                  0,71%        Advances from Customers (Note 20)
           Utang Bank Jangka Panjang (Catatan 15)    877.641.008.816                 11,36%           677.672.349.774                8,40%     656.859.372.080                  8,35%          Long-Term Bank Loans (Note 15)
         Jumlah                                      985.630.407.715                 12,76%           776.524.233.606                9,63%     849.608.188.525                 10,80%                                        Total


                                                                                                     30 Juni/June 30
                                                                                          2023                                    2022
                                                                                            Rp                                     Rp


   Pendapatan Usaha                                                                                                                                                                                           Revenues

        Pendapatan Usaha (Catatan 26)                                              576.494.389.614                         605.105.521.758                                                 Revenues (Note 26)


38. SEGMEN OPERASI                                                                                                  38. OPERATING SEGMENT

   Perusahaan melaporkan segmen -                                                   segmen                                   The Companys’s reportable segments are based on
   berdasarkan divisi - divisi operasi berikut:                                                                              the following operating divisions:

   1.    Precast                                                                                                             1.       Precast
   2.    Readymix                                                                                                            2.       Readymix
   3.    Jasa konstruksi                                                                                                     3.       Construction service

   Segmen precast, readymix dan jasa konstruksi                                                                              The manufacturing of precast and readymix, and
   dianggap sebagai segmen operasi terpisah oleh                                                                             construction service are considered as separate
   pengambil keputusan operasional.                                                                                          operating segment by the chief operating decision
                                                                                                                             maker.

   a.    Informasi berdasarkan Produksi dan Jasa                                                                             a.      Information by Product and Services

                                                                                                      30 Juni/June 30 , 2023
                                                                        Precast/                Readymix/          Konstruksi/                Jumlah/
                                                                        Precast                 Readymix          Construction                 Total
                                                                          Rp                       Rp                   Rp                      Rp

         Pendapatan Usaha                                            195.950.561.759          308.328.273.918         137.399.551.288           641.678.386.965                                                        Revenues
         Beban Pokok Pendapatan                                    (146.367.131.168)        (271.164.044.729)       (127.510.067.968)         (545.041.243.865)                                                Cost of Revenues
         Laba Bruto                                                     49.583.430.591            37.164.229.189          9.889.483.320         96.637.143.100                                                Gross Profit (Loss)
         Beban Penjualan, umum dan administrasi                                      --                        --                    --       (372.243.091.925)                     Selling, General and Administrative Expenses
         Non Contributing Plant Expenses                                             --                        --                    --       (166.348.854.745)                                 Non-Contributing Plant Expenses
         Beban Pajak Penghasilan Final                                               --                        --                    --           (804.841.160)                                        Final Income Tax Expense
         Penghasilan lain-lain Bersih                                                --                        --                    --         327.689.450.459                                                Other Income - Net
         Rugi Sebelum Pajak dan Beban Keuangan                                       --                        --                    --       (115.070.194.271)                           Loss Before Finance Charges and Tax
         Beban Keuangan                                                              --                        --                    --       (148.690.503.360)                                                 Finance Charges
         Rugi Sebelum Pajak                                                          --                        --                    --       (263.760.697.631)                                                   Loss before tax
         Beban Pajak Penghasilan                                                     --                        --                    --                        --                                                     Income Tax
         Rugi Bersih Periode Berjalan                                                                                                         (263.760.697.631)                                              Loss for the Period



                                                                                                       125
Page 129
                                                                                                                              The original financial statements included herein are in
                                                                                                                                                            the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                                                       PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                                                               NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                                                     JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                                                  30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                                                     ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                                                    (UNAUDITED)

                                                                                   30 Juni/June 30 , 2023
                                                        Precast/             Readymix           Konstruksi                  Jumlah
                                                        Precast              Readymix          Construction                  Total
                                                          Rp                    Rp                   Rp                       Rp

       Aset                                                                                                                                                                              Assets
         Piutang Usaha                                                                                                                                                Accounts Receivable - Net
            Berelasi                                  321.209.338.217        180.680.252.747       250.536.019.918          752.425.610.883                                    Related Parties
            Pihak Ketiga                              120.262.128.015         67.647.479.045         4.739.190.435          192.648.797.496                                      Third Parties
         Tagihan Bruto                                                                                                                                   Gross Amount Due from Customers - Net
            Berelasi                                    59.394.593.181        55.452.780.883       190.917.268.369           305.764.642.434                                   Related Parties
            Pihak Ketiga                                31.435.038.287         2.384.321.056         4.178.967.062            37.998.326.405                                     Third Parties
         Persediaan                                    198.489.340.650       106.582.942.688        17.759.902.871           322.832.186.209                                         Inventories
         Aset Tetap - bersih                         2.613.449.917.295       802.649.416.328        54.108.409.219         3.470.207.742.842                 Property Plant and Equipment - Net
         Aset yang Tidak Dapat Dialokasikan                          --                    --                    --          274.303.994.886                                 Unallocated Assets
                                                                                                                                            ,
       Jumlah Aset                                                                                                         5.356.181.301.154                                         Total Assets

       Liabilitas                                                                                                                                                                      Liabilities
          Liabilitas yang Tidak Dapat Dialokasikan                   --                    --                    --        7.723.150.498.209                                Unallocated Liabilities
       Jumlah Liabilitas                                                                                                   7.723.150.498.209                                      Total Liabilities


                                                                               31 Desember/December 31 , 2022
                                                        Precast/              Readymix         Konstruksi                   Jumlah
                                                        Precast               Readymix        Construction                   Total
                                                          Rp                     Rp               Rp                          Rp

       Aset                                                                                                                                                                                Assets
         Piutang Usaha                                                                                                                                                 Accounts Receivable - Net
            Berelasi                                   216.101.740.302       115.087.222.893       290.024.494.115           621.213.457.310                                     Related Parties
            Pihak Ketiga                               117.532.121.296        89.366.259.317         5.154.303.088           212.052.683.701                                       Third Parties
         Tagihan Bruto                                                                                                                                   Gross Amount Due from Customers - Net
            Berelasi                                    69.221.230.578        44.220.898.636       401.309.563.018           514.751.692.232                                     Related Parties
            Pihak Ketiga                               106.981.680.093        66.483.848.916         5.737.066.433           179.202.595.442                                       Third Parties
         Persediaan                                    196.397.288.283       128.004.379.727        21.791.636.398           346.193.304.408                                           Inventories
         Aset Tetap - bersih                         2.796.537.674.478       762.728.957.938       121.634.923.977         3.680.901.556.393                 Property, Plant, and Equipment - Net
         Aset yang Tidak Dapat Dialokasikan                                                                                  409.342.662.392                                   Unallocated Assets

       Jumlah Aset                                                                                                         5.963.657.951.878                                         Total Assets

       Liabilitas                                                                                                                                                                       Liabilities
          Liabilitas yang Tidak Dapat Dialokasikan                    --                    --                       --    8.066.866.451.302                                 Unallocated Liabilities

       Jumlah Liabilitas                                                                                                   8.066.866.451.302                                      Total Liabilities


                                                                                   30 Juni/June 30 , 2022
                                                       Precast/              Readymix           Konstruksi                Jumlah/
                                                       Precast               Readymix          Construction                Total
                                                         Rp                     Rp                   Rp                     Rp

       Pendapatan Usaha                                295.101.285.837       146.838.920.483       301.848.701.953          743.788.908.273                                           Revenues
       Beban Pokok Pendapatan                        (246.205.449.819)     (125.733.479.915)     (267.368.471.414)        (639.307.401.148)                                  Cost of Goods Sold
       Laba Bruto                                      48.895.836.018        21.105.440.568        34.480.230.539           104.481.507.125                                          Gross Profit
       Beban Penjualan, umum dan administrasi                       --                    --                    --        (588.212.296.561)        Selling, General and Administrative Expenses
       Beban - Non Contributing Plant                                                                                     (145.970.025.395)                    Non-Contributing Plant Expenses
       Beban Pajak Final                                            --                    --                    --           (8.129.316.242)                          Final Income Tax Expense
       Penghasilan (Beban) Lain-lain Bersih                         --                    --                    --        2.344.909.193.873                                  Others Income - Net
       Laba Sebelum Pajak dan Beban Keuangan                        --                    --                    --        1.707.079.062.800       Loss Before Finance Charges and Income Tax
       Beban Keuangan                                               --                    --                    --        (279.346.229.558)                                  Finance Charges
       Laba Sebelum Pajak                                           --                    --                    --        1.427.732.833.242                                     Loss Before Tax
       Beban Pajak Penghasilan                                      --                    --                    --                        --                                         Income Tax
       Laba Bersih Periode Berjalan                                                                                       1.427.732.833.242                                Profit for the Period




                                                                                     126
Page 130
                                                                                                                      The original financial statements included herein are in
                                                                                                                                                    the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                                                PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                                                        NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                                              JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                                           30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                                              ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                                             (UNAUDITED)

                                                                                 30 Juni/June 30 , 2022
                                                       Precast/            Readymix           Konstruksi                Jumlah
                                                       Precast             Readymix          Construction                Total
                                                         Rp                   Rp                   Rp                     Rp

        Aset                                                                                                                                                                        Assets
          Piutang Usaha                                                                                                                                         Accounts Receivable - Net
             Berelasi                                 430.099.073.287     241.930.728.723     73.793.172.410            745.822.974.420                                   Related Parties
             Pihak Ketiga                             129.428.150.775      72.803.334.811      3.347.980.742            205.579.466.328                                     Third Parties
          Tagihan Bruto                                                                                                                           Gross Amount Due from Customers - Net
             Berelasi                                  84.063.670.056       91.068.975.893   285.599.875.454             460.732.521.403                                  Related Parties
             Pihak Ketiga                              34.706.117.090       37.598.293.513    44.829.561.082             117.133.971.685                                    Third Parties
          Persediaan                                  386.163.777.740      141.511.213.518   161.312.043.387             688.987.034.645                                        Inventories
          Aset Tetap - bersih                         605.749.208.729    3.098.962.759.060   250.599.838.315           3.955.311.806.104              Property, Plant, and Equipment - Net
          Aset yang Tidak Dapat Dialokasikan                                                                             341.327.656.405                                Unallocated Assets

        Jumlah Aset                                                                                                    6.514.895.430.991                                     Total Assets


        Liabilitas                                                                                                                                                              Liabilities
           Liabilitas yang Tidak Dapat Dialokasikan                --                   --                  --         7.863.574.287.054                             Unallocated Liabilities

        Jumlah Liabilitas                                                                                              7.863.574.287.054                                  Total Liabilities


   b.   Informasi berdasarkan wilayah geografis                                                    b.       Information by geographical location

                                                              30 Juni/              31 Desember/                 30 Juni/
                                                              June 30,              December 31,                 June 30,
                                                                2023                    2022                       2022
                                                                 Rp                      Rp                         Rp

        Aset                                                                                                                                                                     Assets
          Pulau Jawa                                        4.013.303.584.507       4.049.266.405.990        6.004.782.339.288                                             Java Island
          Luar Pulau Jawa                                   1.342.877.716.647       1.914.391.545.888          510.113.091.703                                    Outside Java Islands
        Jumlah                                              5.356.181.301.154       5.963.657.951.878        6.514.895.430.991                                                       Total

                                                              30 Juni/              31 Desember/                 30 Juni/
                                                              June 30,              December 31                  June 30,
                                                                2023                    2022                       2022
                                                                 Rp                      Rp                         Rp
        Liabilitas                                                                                                                                                            Liabilities
          Pulau Jawa                                        6.794.869.159.839       6.954.187.661.699        6.293.410.150.218                                             Java Island
          Luar Pulau Jawa                                     928.281.338.370       1.112.678.789.603        1.570.164.136.836                                    Outside Java Islands

        Jumlah                                              7.723.150.498.209       8.066.866.451.302        7.863.574.287.054                                                       Total

                                                                                30 Juni/June 30 ,
                                                                         2023                    2022
                                                                          Rp                      Rp
        Pendapatan Usaha                                                                                                                                                Revenues
          Pulau Jawa                                                378.202.729.437             506.430.653.044                                                      Java Island
          Luar Pulau Jawa                                           263.475.657.529             237.358.255.229                                             Outside Java Islands

        Jumlah                                                      641.678.386.965             743.788.908.273                                                                    Total



                                                                                127
Page 131
                                                                                                                                                               The original financial statements included herein are in
                                                                                                                                                                                             the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                                                                                           PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                                                                                                   NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                                                                                         JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                                                                                      30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                                                                                         ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                                                                                        (UNAUDITED)

39. BANK GARANSI                                                                                                                      39. BANK GUARANTEE

   Pada tanggal 30 Juni 2023 dan 31 Desember 2022,                                                                                                 As of June 30, 2023 and December 31, 2022, the
   Perusahaan menggunakan bank garansi sebagai                                                                                                     Company has given bank guarantees as follows:
   berikut:

                                                                                                                                                                 30 Juni/                                            31 Desember/
                                                                                                                                                                 June 30,                                            December 31,
                                                                                                                                                                   2023                                                  2022
                                                                      Bank                                                                                          Rp                                                    Rp
   PT AIA Indonesia                                                                                                                                              27.861.340.186                                         27.861.340.186
   PT Bank BRI (Persero) Tbk                                                                                                                                     23.661.541.095                                                     --
   PT Bank Mandiri (Persero) Tbk                                                                                                                                 20.885.512.224                                           567.889.100
   PT Penjaminan Jamkrindo Syariah                                                                                                                                9.403.435.480                                                     --
   PT Asuransi Jasaraharja Putera                                                                                                                                 8.139.254.318                                                     --
   PT Bosowa Insurance                                                                                                                                            3.086.893.800                                        10.140.000.000
   PT Bank Tabungan Negara (Persero) Tbk                                                                                                                                                    --                            2.718.334.370




40. IKATAN                                                                                                                             40. COMMITMENTS

    No                                           Proyek / Project                                               Pemilik Proyek / Project Owners            Nilai Kontrak / Contract Value               Periode Perjanjian / Period of Agreement
    1                 Proyek Jalan Tol Kayu Agung - Palembang - Betung 4 Seksi 3B (ADD-V)                   PT Waskita Karya (Infrastructure 3 Division)           5.697.354.000                 23 December 2022      s.d./ until       31 May 2023
    2                                    Tol Inderapura - Kisaran (ADD-6)                                                PT HAKAASTON                             38.560.539.500                 30 December 2022      s.d./ until    28 February 2023
    3                              Proyek Penanganan Muara Sungai Cidurian                                           PT Gunakarya Nusantara                        4.535.340.000                  24 October 2022      s.d./ until      31 March 2023
    4                               Proyek Penanganan Muara Sungai Ciujung                                           PT Gunakarya Nusantara                        7.727.500.000                  24 October 2022      s.d./ until      31 March 2023
    5                       Proyek Tol Tebing Tinggi Serbelawan - Pematang Siantar                                       PT Hutama Karya                           4.073.600.000                 16 December 2022      s.d./ until    15 February 2023
            Proyek Design & Build Pembangunan Bangunan Gedung Sekretariat Presiden dan Bangunan
    6                                                                                                          PT Waskita Karya (Building Division)               55.598.863.600                  09 January 2023      s.d./ until    30 December 2023
                        Pendukung pada Kawasan Istana Kepresidenan di Ibukota Negara
    7                         Kayu Agung - Palembang - Betung II Seksi 2 (ADD-III)                          PT Waskita Karya (Infrastructure 3 Division)          50.901.108.200                   09 March 2023       s.d./ until     31 August 2023
    8                          Kayu Agung - Palembang - Betung II Seksi 3 (ADD-III)                         PT Waskita Karya (Infrastructure 3 Division)          60.736.676.900                   06 March 2023       s.d./ until     31 August 2023
    9                        Kayu Agung - Palembang - Betung IV Seksi 3B (ADD-III)                          PT Waskita Karya (Infrastructure 3 Division)          15.365.630.700                 20 February 2023      s.d./ until     31 August 2023
    10                       Kayu Agung - Palembang - Betung IV Seksi 2A (ADD-III)                          PT Waskita Karya (Infrastructure 3 Division)          71.078.977.700                   07 March 2023       s.d./ until     31 August 2023
    11                                       Jembatan Musi (ADD-II)                                         PT Waskita Karya (Infrastructure 1 Division)          51.109.192.600                  03 January 2023      s.d./ until     31 August 2023
    12                    Proyek Tol IKN SP. Tempadung - Jembatan Pulau Balang Girder                            Waskita - Nindya - Modern KSO                    14.856.000.000                 20 December 2022      s.d./ until    28 February 2023
    13                  Proyek Tol IKN SP. Tempadung - Jembatan Pulau Balang Readymix                            Waskita - Nindya - Modern KSO                    86.146.897.635                 13 December 2022      s.d./ until      22 June 2023
    14        Proyek Tol Tebing Tinggi Parapat - Tahap I Ruas Serbelawan - Siantar (Seksi 4) (ADD-II)                    PT Hutama Karya                          43.102.538.172                 08 February 2023      s.d./ until      15 June 2023
    15                Proyek Jalan Tol Kayu Agung - Palembang - Betung II Seksi 3 (ADD-VI)                  PT Waskita Karya (Infrastructure 3 Division)          12.991.920.000                 20 December 2022      s.d./ until      31 March 2023
    16                       Jalan Tol Jakarta - Cikampek II Selatan Paket 3 (ADD-XI)                       PT Waskita Karya (Infrastructure 2 Division)          382.378.479.960                31 December 2022      s.d./ until      31 March 2023
    17                               Proyek Jalan Tol Paspro Seksi 4 (ADD-V)                                PT Waskita Karya (Infrastructure 2 Division)          64.774.366.980                   24 March 2023       s.d./ until      29 April 2023
    18                                 Jalan Tol Indrapura - Kuala Tanjung                                               PT Hutama Karya                          25.203.536.000                 06 December 2022      s.d./ until     31 January 2023
    19                       Proyek Tol Tebing Tinggi - Serbelawan (Seksi 3) (ADD-III)                                   PT Hutama Karya                          31.682.361.900                 06 December 2022      s.d./ until     03 January 2023
    20                            Proyek Pengaman Pantai KEK Tanjung Lesung                                 PT Waskita Karya (Infrastructure 1 Division)           3.486.700.000                 04 November 2022      s.d./ until    26 December 2022
    21                     Proyek Kayu Agung - Palembang - Betung II Seksi 2 (ADD-II)                       PT Waskita Karya (Infrastructure 3 Division)          36.241.502.240                 15 February 2023      s.d./ until      30 June 2023
    22                                     Flyover Sekip Ujung (ADD-II)                                              Waskita - Kencana KSO                        16.485.000.000                 01 February 2023      s.d./ until     21 August 2023
    23                                     Flyover Sekip Ujung (ADD-I)                                               Waskita - Kencana KSO                        12.783.620.000                 01 September 2022     s.d./ until    25 November 2023
    24                                         Flyover Sekip Ujung                                                   Waskita - Kencana KSO                        13.440.000.000                 01 February 2023      s.d./ until    18 December 2023
    25                              Proyek Jembatan Musi Non PMN (ADD-V)                                              Infrastructure 1 Division                    6.945.422.900                 13 February 2023      s.d./ until      30 June 2023
    26                                 Proyek Jembatan Musi PMN (ADD-V)                                               Infrastructure 1 Division                    3.808.780.300                 13 February 2023      s.d./ until      30 June 2023
    27   Pembangunan Fasilitas Perkeretaapian untuk Manggarai sd Jatinegara (Paket A) (Tahap II) (ADD-II)             Waskita - Utama KSO                          8.076.752.000                 22 February 2023      s.d./ until    23 December 2023
    28                   Proyek Tol IKN SP. Tempadung - Jembatan Pulau Balang (ADD-I)                            Waskita - Nindya - Modern KSO                    86.146.897.635                 01 February 2023      s.d./ until      22 June 2023
    29                   Proyek Tol IKN SP. Tempadung - Jembatan Pulau Balang (ADD-I)                            Waskita - Nindya - Modern KSO                    14.856.000.000                 23 February 2023      s.d./ until      30 April 2023
    30             Proyek Jalan Tol Kayu Agung - Palembang - Betung Paket II Seksi 3 (ADD-VI)                         Infrastructure 3 Division                    6.172.133.500                   23 March 2023       s.d./ until       31 May 2023
    31                            Kayu Agung - Palembang - Betung IV Seksi 3B                                         Infrastructure 3 Division                   26.460.968.900                   01 March 2023       s.d./ until     31 August 2023
    32                                 Proyek Selatox Biopharma Jababeka                                        PT Hans Enjiniring dan Konstruksi                  4.528.040.000                   06 March 2023       s.d./ until       31 May 2023
    33               Proyek Pembangunan Pengaman Pantai di Teluk Jakarta Tahap 6 Paket 3                                Adhi - Minarta KSO                        49.798.800.000                 01 February 2023      s.d./ until       30 July 2023
    34               Proyek Pembangunan Pabrik Kelapa Sawit PT Banyuasin Industri Lestari                          PT Banyuasin Industri Lestari                   1.295.757.000                 16 February 2023      s.d./ until       17 May 2023
            Proyek Design & Build Pembangunan Bangunan Gedung Sekretariat Presiden dan Bangunan
    35                                                                                                                   Building Division                        55.598.863.600                  09 January 2023      s.d./ until    30 December 2023
                        Pendukung pada Kawasan Istana Kepresidenan di Ibukota Negara
    36                       Rentang Irrigation Modernization Project Paket LMS-03                                    Infrastructure 1 Division                    9.243.568.833                 24 November 2022      s.d./ until    30 December 2023
    37   Proyek Pembangunan Jalan Kerja Logistik IKN Paket Pembangunan Jalan Lingkar Sepaku Segmen 4                  Waskita - Guntur KSO                         6.365.896.875                  12 October 2022      s.d./ until       31 May 2023
    38                                       RSUD Tigaraksa (ADD-I)                                                      Building Division                         6.090.280.800                   13 March 2023       s.d./ until       31 May 2023
    39                               Proyek PT Hijau Lestari Raya Fibreboard                                     PT Hijau Lestari Raya Fibreboard                  7.138.950.000                   15 March 2023       s.d./ until     13 August 2023
    40                              Proyek Gedung Perkuliahan UIN Bandung                                                Building Division                         6.652.440.000                   31 March 2023       s.d./ until       01 May 2023
    41                        Proyek Jalan Tol Jakarta - Cikampek II Selatan Paket 3                        PT Waskita Karya (Infrastructure 2 Division)          30.742.000.000                  27 October 2022      s.d./ until      30 March 2023
    42                    Proyek Jalan Tol Jakarta - Cikampek II Selatan Paket 3 (ADD-I)                    PT Waskita Karya (Infrastructure 2 Division)          58.975.249.975                 30 December 2022      s.d./ until      30 March 2023
    43                                Pembangunan Jalan Tol Becakayu 2B                                     PT Waskita Karya (Infrastructure 2 Division)          256.584.551.000                  03 June 2021        s.d./ until      03 June 2023
    44                                    Pengadaan CCSP Loji Banger                                        PT Waskita Karya (Infrastructure 2 Division)          44.754.000.000                 31 December 2021      s.d./ until    28 February 2023
    45                                 Pemancangan Spun Pile Loji Banger                                    PT Waskita Karya (Infrastructure 2 Division)           4.000.000.000                 31 December 2021      s.d./ until    28 February 2023
    46                                   Pemancangan CCSP Loji Banger                                       PT Waskita Karya (Infrastructure 1 Division)           3.585.260.000                    02 July 2021       s.d./ until    28 February 2023




                                                                                                                      128
Page 132
                                                                                                                                        The original financial statements included herein are in
                                                                                                                                                                      the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                                                               PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                                                                       NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                                                             JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                                                          30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                                                             ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                                                            (UNAUDITED)

41. REKONSILIASI LIABILITAS YANG TIMBUL DARI                                                              41. RECONCILIATION OF LIABILITIES                                              ARISING
    AKTIVITAS PENDANAAN                                                                                       FROM FINANCING ACTIVITIES

   Tabel di bawah ini menjelaskan perubahan dalam                                                                 The table below details changes in the Company’s
   liabilitas yang timbul dari aktivitas pendanaan,                                                               liabilities arising from financing activities, including
   termasuk perubahan yang timbul dari arus kas dan                                                               both cash and non-cash changes. Liabilities arising
   perubahan nonkas. Liabilitas yang timbul dari                                                                  from financing activities are those for which cash
   aktivitas pendanaan adalah liabilitas yang arus kas,                                                           flows were, or future cash flows will be, classified in
   atau arus kas masa depannya, diklasifikasikan dalam                                                            the statement of cash flows as cash flows from
   laporan arus kas sebagai arus kas dari aktivitas                                                               financing activities.
   pendanaan.

                                                                                               30 Juni/June 30, 2023
                                                                                                                Perubahan Transaksi Non-Kas/
                                                                                                                     Non-Cash Changes
                                                                                             Amortisasi atas
                                                                                            beban penerbitan
                                             Arus Kas dari          Penyesuaian                 obligasi/          Amortisasi atas
                     1 Januari/          Aktivitas Pendanaan/        nilai wajar/            Amortization of         nilai wajar/                                     30 Juni/
                     January 1,            Financing Cash            Fair value              bond issuance         Amortization of           Lain-lain/              June 30,
                        2023                     Flows               adjustment                   cost               fair value               Others                   2023
                         Rp                        Rp                     Rp                       Rp                     Rp                    Rp                      Rp



   Utang Bank        1.979.402.703.925                       --     (2.638.754.057.799)                      --      47.289.614.784           2.813.491.700.870      2.201.429.961.780       Bank Loans
   Utang Obligasi    2.062.515.860.484                        --      (117.504.317.182)                      --        9.589.721.428            116.294.557.846      2.070.895.822.576     Bonds Payable
   Liabilitas Sewa       9.954.559.610                        --                     --                      --                    --                                    9.954.559.610    Lease Liabilities
                     4.051.873.124.019                          -   (2.756.258.374.981)                     -        56.879.336.212           2.929.786.258.716      4.282.280.343.966


                                                                                          31 Desember/December 31 , 2022
                                                                                                             Perubahan Transaksi Non-Kas/
                                                                                                                    Non-Cash Changes
                                                                                             Amortisasi atas
                                                                                            beban penerbitan
                                             Arus Kas dari          Penyesuaian                 obligasi/        Amortisasi atas
                     1 Januari/          Aktivitas Pendanaan/        nilai wajar/            Amortization of        nilai wajar/                                   31 Desember/
                     January 1,            Financing Cash            Fair value              bond issuance      Amortization of           Lain-lain/               December 31,
                        2022                     Flows               adjustment                   cost               fair value            Others                      2022
                         Rp                        Rp                     Rp                       Rp                    Rp                  Rp                         Rp



   Utang Bank        3.865.231.347.315                      --      (2.317.051.206.228)                     --       18.035.456.901             413.187.105.937      1.979.402.703.925       Bank Loans
   Utang Obligasi    1.997.171.930.923                       --       (118.938.357.735)         2.828.069.077          4.077.840.437            177.376.377.782      2.062.515.860.484     Bonds Payable
   Liabilitas Sewa      17.118.044.665         (5.359.613.880)                       --                     --                     --            (1.803.871.023)         9.954.559.762    Lease Liabilities
                     5.879.521.322.903         (5.359.613.880)      (2.435.989.563.963)         2.828.069.077        22.113.297.338             588.759.612.696      4.051.873.124.171


                                                                                             30 Juni/June 30 , 2022
                                                                                                                Perubahan Transaksi Non-Kas/
                                                                                                                     Non-Cash Changes
                                                                                            Amortisasi atas
                                                                                           beban penerbitan
                                             Arus Kas dari          Penyesuaian                obligasi/           Amortisasi atas
                     1 Januari/          Aktivitas Pendanaan/        nilai wajar/           Amortization of          nilai wajar/                                    30 Juni/
                     January 1,            Financing Cash            Fair value             bond issuance          Amortization of           Lain-lain/             June 30,
                        2022                     Flows               adjustment                  cost                fair value               Others                  2022
                         Rp                        Rp                     Rp                      Rp                      Rp                    Rp                     Rp


   Utang Bank        3.865.231.347.315                      --      (2.264.925.850.959)                     --                     --          337.389.735.525      1.937.695.231.881       Bank Loans
   Utang Obligasi    1.997.171.930.923                       --       (115.918.375.518)         2.828.069.077                      --          122.090.277.776      2.006.171.902.258     Bonds Payable
   Liabilitas Sewa      17.118.044.665         (2.020.454.846)                       --                     --                     --                        --        15.097.589.819    Lease Liabilities

                     5.879.521.322.903         (2.020.454.846)      (2.380.844.226.477)        2.828.069.077                       -           459.480.013.301      3.958.964.723.958



                                                                                              129
Page 133
                                                                                                                       The original financial statements included herein are in
                                                                                                                                                     the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                                                 PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                                                         NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                                               JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                                            30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                                               ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                                              (UNAUDITED)

   Untuk tahun yang berakhir 30 Juni 2023, 31                                                       During the years ended June 30, 2023, December 31,
   Desember 2022 dan 30 Juni 2022, Perusahaan                                                       2022 and June 30, 2022, the Company has investing
   mempunyai transaksi investasi dan pendanaan yang                                                 and financing activities that did not affect cash and
   tidak mempengaruhi kas dan setara kas dan tidak                                                  cash equivalents, hence, were not included in the
   termasuk dalam laporan arus kas dengan rincian                                                   statements of cash flows with details as follows:
   sebagai berikut:

                                                             30 Juni/              31 Desember/                30 Juni/
                                                             June 30,              December 31,                June 30,
                                                               2023                    2022                      2022
                                                                Rp                      Rp                        Rp

   Peningkatan utang bank dan                                                                                                                                     Increase in bank loans and
     Utang obligasi dari restrukturisasi                                                                                                                 bonds payable from restructuring
     beban akrual atas bunga                               2.929.786.258.716         590.563.483.719          459.480.013.299                                             of accrued interest
   Amortisasi atas penyesuaian nilai wajar                                                                                                              Amortization of fair value adjustments
     atas restrukturisasi utang bank dan utang obligasi       56.879.336.212          22.113.297.338                                 on the restructuring of bank loans and bonds payable
   Amortisasi atas biaya                                                                                                                                                        Amortization of
     penerbitan obligasi                                                   --          2.828.069.077            2.828.069.077                                            bond issuance cost
   Penyesuaian nilai wajar atas restrukturisasi                                                                                                  Fair value adjusment due to restructuring of
     utang bank dan utang obligasi                        (2.756.258.374.981)     (2.435.989.563.963)      (2.380.844.226.477)                               bank loans and bonds payable
   Penambahan Aset Tetap Melalui
     Utang Usaha                                                           --                      --             820.699.996

42. INSTRUMEN KEUANGAN, MANAJEMEN RISIKO                                                     42. FINANCIAL INSTRUMENTS, FINANCIAL RISK
    KEUANGAN DAN MODAL                                                                           AND CAPITAL MANAGEMENT

   a.      Kategori dan Kelas Instrumen Keuangan                                                    a.      Categories and                   Classes               of        Financial
                                                                                                            Instruments

                                                               30 Juni/                31 Desember/                30 Juni/
                                                               June 30,                December 31,                June 30,
                                                                 2023                      2022                      2022
                                                                  Rp                        Rp                        Rp
           Aset keuangan diukur pada                                                                                                                      Financial assets measured at
              biaya perolehan diamortisasi                                                                                                                               amortized cost
           Kas dan setara kas                                    64.594.984.458          238.946.856.294          174.247.058.692                             Cash and cash equivalents
           Piutang usaha - Bersih                                                                                                                             Accounts receivables - Net
              Pihak berelasi                                    752.425.610.883          621.213.457.310          745.822.974.420                                      Related parties
              Pihak ketiga                                      192.648.797.495          212.052.683.701          205.579.466.328                                        Third parties
           Piutang lain-lain                                                                                                                                            Others receivable
              Pihak berelasi                                     17.791.338.563           17.050.686.215            5.666.001.800                                      Related parties
              Pihak ketiga                                        5.586.223.270            8.038.207.739            3.350.661.482                                        Third parties
           Tagihan bruto - Bersih                                                                                                                  Gross amount due from customers - Net
              Berelasi                                          305.764.642.434          514.751.692.232          460.732.521.403                                      Related parties
              Pihak ketiga                                       37.998.326.405          179.202.595.442          117.133.971.685                                        Third parties
           Aset Lain-lain - Bersih                                2.739.826.454              419.400.666            3.904.744.624                                      Other Assets - Net
           Jumlah Aset Keuangan                               1.379.549.749.962        1.791.675.579.599        1.716.437.400.434                                    Total Financial Assets


           Liabilitas pada biaya perolehan diamortisasi                                                                                             Financial liabilities at amortized cost
           Utang bank                                                                                                                                                             Bank loans
              Pihak berelasi                                    877.641.008.816          677.672.349.774          656.859.372.080                                         Related parties
              Pihak ketiga                                    1.323.788.952.964        1.301.730.354.151        1.280.835.859.801                                            Third parties
           Utang usaha                                                                                                                                                   Accounts payables
              Pihak berelasi                                     47.052.248.468           48.464.689.028           59.715.817.762                                         Related parties
              Pihak ketiga                                    2.762.530.289.215        3.231.908.324.174        3.126.128.777.065                                            Third parties
           Utang lain-lain                                                                                                                                                    Other payables
              Pihak berelasi                                     20.260.904.180           17.951.130.090           77.127.711.007                                         Related parties
              Pihak ketiga                                        2.081.834.914            1.051.369.710              611.994.295                                            Third parties
           Beban akrual                                         470.180.113.393          578.761.527.449          472.743.681.126                                           Accrual expense
           Utang obligasi                                     2.070.895.822.576        2.062.515.860.484        2.006.171.902.258                                             Bonds payable
           Liabilitas Sewa                                        9.954.559.610            9.954.559.762           15.097.589.819                                            Lease Liabilities
           Jumlah Liabilitas Keuangan                         7.584.385.734.136        7.930.010.164.622        7.695.292.705.212                                Total Financial Liabilities



                                                                                  130
Page 134
                                                                                 The original financial statements included herein are in
                                                                                                               the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                    PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                            NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                  JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                               30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                  ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                 (UNAUDITED)

   b.   Tujuan dan Kebijakan Manajemen Risiko                      b.     Financial Risk Management Objectives and
        Keuangan                                                          Policies

        Tujuan dan kebijakan manajemen risiko                             The     Company’s         overall     financial     risk
        keuangan        Perusahaan        adalah     untuk                management and policies seek to ensure that
        memastikan bahwa sumber daya keuangan yang                        adequate financial resources are available for the
        memadai       tersedia     untuk    operasi    dan                operation and development of its business, while
        pengembangan bisnis, serta untuk mengelola                        managing its exposure to foreign exchange risk,
        risiko mata uang asing, tingkat bunga, risiko                     interest rate risk, credit risk and liquidity risk. The
        kredit dan risiko likuiditas. Tujuan dan kebijakan                following are the Company’s financial risk
        manajemen risiko keuangan Perusahaan adalah                       management objectives and policies:
        sebagai berikut:

         i.     Manajemen Risiko Mata Uang Asing                         i.    Foreign Exchange Risk Management

                Perusahaan tidak terekspos secara                              The Company is not significantly exposed to
                signifikan terhadap pengaruh fluktuasi nilai                   the effect of foreign exchange rate
                tukar mata uang asing dikarenakan hampir                       fluctuations because most of its transactions
                semua transaksi dilakukan dalam mata                           are denominated in Rupiah.
                uang Rupiah.

        ii.     Manajemen Risiko Tingkat Suku Bunga                     ii.    Interest Rate Risk Management

                Risiko suku bunga merujuk kepada risiko                        Interest rate risk refers to the risk that the fair
                dimana nilai wajar atau aliran kas                             value or future cash flows of a financial
                mendatang dari suatu instrumen keuangan                        instrument will fluctuate because of changes
                akan berfluktuasi karena perubahan suku                        in market interest rate. Interest rate risk
                bunga pasar. Risiko suku bunga timbul dari                     arises     on     interest-bearing       financial
                instrumen keuangan yang menghasilkan                           instruments that are recognized in the
                bunga yang diakui pada laporan perubahan                       statements of financial position (e.g. debt
                posisi keuangan (contohnya: instrumen                          instruments acquired or issued), and some
                utang yang diperoleh atau diterbitkan), dan                    financial instruments that are not recognized
                beberapa instrumen keuangan yang tidak                         in the statements of financial position (e.g.
                diakui dalam laporan posisi keuangan                           some loan commitments).
                (contohnya: beberapa perjanjian pinjaman).

                Kebijakan Perusahaan adalah untuk                              The Company’s policy is to obtain the most
                memperoleh tingkat bunga yang paling                           favourable interest rates available in the
                menguntungkan yang tersedia di pasar.                          market. Management believes that the
                Manajemen berpendapat bahwa risiko                             interest rate risk pertaining to fair value is
                terhadap nilai wajar dapat dikelola dengan                     manageable.
                baik.

                Perusahaan tidak menyiapkan analisis                           No sensitivity analysis is prepared as the
                sensitivitas dikarenakan tidak terdapat                        Company does not expect any material
                dampak yang material terhadap laba rugi                        effect on the Company’s profit or loss arising
                Perusahaan yang timbul dari dampak                             from the effects of reasonably possible
                perubahan yang secara wajar terhadap                           changes to interest rate on interest-bearing
                suku bunga instrument keuangan yang                            financial instruments at the end of the
                berbunga tetap dan dinilai pada biaya                          reporting period as its interest-bearing
                diamortisasi pada akhir periode pelaporan.                     instrument carry fixed interest and are
                                                                               measured at amortized cost.

         iii.   Manajemen Risiko Kredit                                 iii.   Credit Risk Management

                Risiko kredit mengacu pada risiko rekanan                      Credit risk refers to the risk that counterparty
                gagal    dalam    memenuhi      kewajiban                      will default on its contractual obligation
                kontraktualnya    yang    mengakibatkan                        resulting in a loss to the Company.
                kerugian bagi Perusahaan.

                Risiko kredit Perusahaan terutama melekat                      The Company’s credit risk is primarily
                pada rekening bank, piutang usaha, piutang                     attributable to its cash in banks, accounts

                                                           131
Page 135
                                                                          The original financial statements included herein are in
                                                                                                        the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                 PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                         NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022               JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                            30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                               ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                              (UNAUDITED)

             lain-lain dan tagihan bruto. Perusahaan                     receivable, other receivables and gross
             menempatkan saldo Bank pada institusi                       amount due from customers. The Company
             keuangan yang layak serta terpercaya.                       places its bank balances with credit worthy
             Piutang usaha dan piutang lain – lain                       financial institutions. Accounts receivable
             dilakukan dengan pihak ketiga yang                          and other receivable are entered with
             terpercaya dan pihak berelasi. Eksposur                     respected and credit worthy third parties and
             Perusahaan dan counterparties dimonitor                     related parties. The Company’s exposures
             secara terus menerus dan nilai agregat                      and its counterparties are continuously
             transaksi terkait tersebar di antara                        monitored and the aggregate value of
             counterparties yang telah disetujui.                        transactions concluded is spread among
                                                                         approved counterparties.

             Nilai tercatat aset keuangan pada laporan                   The carrying amount of financial assets
             keuangan setelah dikurangi dengan                           recorded in the financial statements, net of
             penyisihan untuk kerugian penurunan nilai                   any allowance for impairment losses
             mencerminkan       eksposur   Perusahaan                    represents the Company’s maximum
             terhadap risiko kredit.                                     exposure to credit risk.

             Piutang usaha merupakan pendapatan                          Accounts receivable includes revenues from
             penjualan dari precast dan readymix                         sale of precast and readymix from WSKT
             kepada WSKT (entitas induk) dan                             (the parent of the Company) and revenues
             pendapatan usaha precast dan jasa                           sale of precast and construction services
             konstruksi kepada CCTW (Catatan 6 dan                       from CCTW (Notes 6 and 27). Ongoing
             27). Evaluasi kredit berjalan dilakukan                     credit evaluation is performed on the
             terhadap kondisi keuangan Perusahaan                        financial condition of the counterparties,
             dan bila memungkinkan, penjualan atau                       where appropriate, sales on credit should be
             pendapatan kredit harus dijamin dengan                      covered by guarantee insurance or by letter
             asuransi penjaminan atau dengan letter                      credit and bank gurantee and also require
             credit dan bank garansi serta dengan                        payment of advances from customers
             meminta pembayaran uang muka dari                           (Note 20).
             pelanggan (Catatan 20).

             Meskipun WSKT, CCTW dan KKDM                                Although WSKT, CCTW and KKDM are the
             merupakan pelanggan utama perusahaan                        main customers of the Company (Note 26),
             (Catatan 26), Perusahaan masih dapat                        the Company is able to manage the
             mengelola eksposur atas konsentrasi risiko                  concentration of credit risk, since the
             kreditnya karena Perusahaan akan dapat                      Company is able to get new customers or
             dengan mudah untuk mencari pelanggan                        generate new sales to related parties such
             baru atau melakukan penjualan ke pihak                      as other companies under WTR Company
             berelasi antara lain perusahaan lain dalam                  and also other state-owned construction
             WTR      Perusahaan dan perusahaan                          companies and also from other third party
             konstruksi BUMN lainnya serta perusahaan                    construction       companies.        Although
             konstruksi pihak ketiga lainnya. Meskipun                   concentration of credit risk from accounts
             konsentrasi risiko kredit terkait dengan                    receivable from WSKT CCTW dan KKDM
             piutang usaha dari WSKT CCTW dan                            which accounts to more than 10% of its total
             KKDM yang melebihi 10% dari jumlah                          accounts receivables, the risk is still
             piutang usaha, risiko ini masih dapat                       manageable       since     its   related   to
             dikelola karena piutang usaha ini terkait                   infrastructure project with the Government.
             dengan proyek – proyek infrastruktur
             Pemerintah.

       iv.   Manajemen Risiko Likuiditas                           iv.   Liquidity Risk Management

             Tanggung jawab utama manajemen risiko                       The ultimate responsibility for liquidity risk
             likuiditas terletak pada Dewan Direksi, yang                management rests with the Board of
             telah membangun kerangka manajemen                          Directors, which has built an appropriate
             risiko likuiditas yang sesuai untuk                         liquidity risk management framework for the
             persyaratan manajemen likuiditas dan                        management of the Company’s short,
             pendanaan jangka pendek, menengah dan                       medium and long-term funding and liquidity
             jangka panjang Perusahaan. Perusahaan                       management requirements. The Company
             mengelola risiko likuiditas dengan menjaga                  manages liquidity risk by maintaining
             kecukupan simpanan, fasilitas bank dan                      adequate reserves, banking facilities and

                                                        132
Page 136
                                                                                                             The original financial statements included herein are in
                                                                                                                                           the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                                       PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                                               NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                                     JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                                  30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                                     ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                                    (UNAUDITED)

           fasilitas simpan pinjam dengan terus                                                           matching the maturity profiles of financial
           menerus memonitor perkiraan dan arus kas                                                       assets and liabilities.
           aktual dan mencocokkan profil jatuh tempo
           aset dan liabilitas keuangan.

           Perusahaan memelihara kecukupan dana                                                           The Company maintains sufficient funds to
           untuk membiayai kebutuhan modal kerja                                                          finance its ongoing working capital
           yang berkelangsungan.                                                                          requirements.

           Tabel risiko likuiditas dan suku bunga                                                         Liquidity and interest risk tables

           Tabel berikut merinci sisa jatuh tempo                                                         The following tables detail the Company’s
           kontraktual untuk liabilitas keuangan                                                          remaining contractual maturity for its non-
           nonderivatif dengan periode pembayaran                                                         derivative financial liabilities with agreed
           yang disepakati Perusahaan. Tabel telah                                                        repayment periods. The tables have been
           disusun berdasarkan arus kas yang tak                                                          drawn up based on the undiscounted cash
           terdiskonto   dari   liabilitas   keuangan                                                     flows of financial liabilities based on the
           berdasarkan tanggal terawal di mana                                                            earliest date on which the Company can be
           Perusahaan      dapat      diminta    untuk                                                    required to pay. The tables include both
           membayar. Tabel mencakup arus kas                                                              interest and principal cash flows. To the
           bunga dan pokok. Untuk arus bunga tingkat                                                      extent that interest flows are floating rate, the
           mengambang jumlah tidak didiskontokan                                                          undiscounted amount is derived from
           berasal dari kurva suku bunga pada akhir                                                       interest rate curves at the end of the
           periode pelaporan. Jatuh tempo kontraktual                                                     reporting period. The contractual maturity is
           didasarkan pada tanggal terawal di mana                                                        based on the earliest date on which the
           Perusahaan      dapat      diminta    untuk                                                    Company may be required to pay.
           membayar.
                                         Tingkat bunga
                                            rata-rata
                                           tertimbang
                                             efektif/
                                            Weighted         Kurang dari
                                            average          satu tahun/                                   Diatas
                                            effective        Less than            1-5 tahun/              5 tahun/              Jumlah/
                                          interest rate        1 year             1-5 years               5+ year                Total
                                                %                Rp                   Rp                     Rp                   Rp
           30 Juni 2023                                                                                                                                          June 30, 2023
           Tanpa bunga                                                                                                                                      Non-interest bearing
             Utang Usaha                                                                                                                                       Other Payables
               Pihak Berelasi                  --             47.052.248.468                     --                    --       47.052.248.468              Related Parties
               Pihak Ketiga                    --          2.762.530.289.215                     --                    --    2.762.530.289.215                Third Parties
             Utang Lain-lain                                                                                                                                   Other Payables
               Pihak Berelasi                  --            20.260.904.180                      --                    --      20.260.904.180               Related Parties
               Pihak Ketiga                    --             2.081.834.914                      --                    --       2.081.834.914                 Third Parties
             Beban Akrual                      --           470.180.113.393                      --                    --     470.180.113.393               Accrued Expenses

           Instrumen suku bunga tetap                                                                                                             Fixed interest rate instruments
             Utang Bank                     2%-4%            671.127.052.204                  --      1.530.302.909.576      2.201.429.961.780                       Bank Loans
             Utang Obligasi                  2%            1.850.769.921.111                  --        220.125.901.465      2.070.895.822.576                   Bonds Payable
             Liabilitas Sewa                 7%                2.971.809.989      6.982.749.621                        --        9.954.559.610                  Lease Liabilities
           Jumlah                                          5.826.974.173.474      6.982.749.621       1.750.428.811.041      7.584.385.734.136                            Total


                                        Tingkat bunga
                                           rata-rata
                                          tertimbang
                                            efektif/
                                           Weighted         Kurang dari
                                           average          satu tahun/                                   Diatas
                                           effective        Less than            1-5 tahun/              5 tahun/              Jumlah/
                                         interest rate        1 year             1-5 years               5+ year                Total
                                               %                Rp                   Rp                     Rp                   Rp
          31 Desember 2022                                                                                                                                 December 31, 2022
          Tanpa bunga                                                                                                                                      Non-interest bearing
            Utang Usaha                                                                                                                                       Other Payables
              Pihak Berelasi                  --             48.464.689.028                    --                     --       48.464.689.028              Related Parties
              Pihak Ketiga                    --          3.231.908.324.174                    --                     --    3.231.908.324.174                Third Parties
            Utang Lain-lain                                                                                                                                   Other Payables
              Pihak Berelasi                  --            17.951.130.090                     --                     --      17.951.130.090               Related Parties
              Pihak Ketiga                    --             1.051.369.710                     --                     --       1.051.369.710                 Third Parties
            Beban Akrual                      --           578.761.527.452                     --                     --     578.761.527.452               Accrued Expenses

          Instrumen suku bunga tetap                                                                                                             Fixed interest rate instruments
            Utang Bank                     2%-4%            671.127.052.204                  --       1.308.275.651.721     1.979.402.703.925                       Bank Loans
            Utang Obligasi                  2%            1.850.769.921.111                  --         211.745.939.370     2.062.515.860.481                   Bonds Payable
            Liabilitas Sewa                 7%                2.971.809.989      6.982.749.773                        --        9.954.559.762                  Lease Liabilities
          Jumlah                                          6.403.005.823.758      6.982.749.773        1.520.021.591.091     7.930.010.164.622                             Total




                                                                           133
Page 137
                                                                                                                      The original financial statements included herein are in
                                                                                                                                                    the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                                              PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                                                      NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                                            JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                                         30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                                            ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                                           (UNAUDITED)

                                                Tingkat bunga
                                                   rata-rata
                                                  tertimbang
                                                    efektif/
                                                   Weighted          Kurang dari
                                                   average           satu tahun/                                   Diatas
                                                   effective         Less than          1-5 tahun/                5 tahun/                   Jumlah/
                                                 interest rate         1 year           1-5 years                 5+ year                     Total
                                                       %                 Rp                 Rp                       Rp                        Rp
              30 Juni 2022                                                                                                                                                  June 30, 2022
              Tanpa bunga                                                                                                                                              Non-interest bearing
                Utang Usaha                                                                                                                                               Other Payables
                  Pihak Berelasi                      --             59.715.817.762                   --                         --          59.715.817.762            Related Parties
                  Pihak Ketiga                        --          3.126.128.777.065                   --                         --       3.126.128.777.065              Third Parties
                Utang Lain-lain                                                                                                                                           Other Payables
                  Pihak Berelasi                      --             77.127.711.007                   --                         --         77.127.711.007             Related Parties
                  Pihak Ketiga                        --                611.994.295                   --                         --            611.994.295               Third Parties
                Beban Akrual                          --            472.743.681.126                   --                         --        472.743.681.126             Accrued Expenses

              Instrumen suku bunga tetap
                Utang Bank                         2%-4%             661.614.800.319                 --        1.276.080.431.562          1.937.695.231.881                  Bank Loans
                Utang Obligasi                      2%             1.803.776.736.110                 --          202.395.166.148          2.006.171.902.258                Bonds Payable
                Liabilitas Sewa                     7%                 5.297.362.269     9.800.227.550                          --           15.097.589.819               Lease Liabilities

              Jumlah                                              6.207.016.879.952     9.800.227.550          1.478.475.597.710          7.695.292.705.212                          Total



    c.   Manajemen Risiko Modal                                                                      c. Capital Risk Management
         Perusahaan mengelola risiko modal untuk                                                           The Company manages capital risk to ensure
         memastikan bahwa mereka akan mampu untuk                                                          that it will be able to continue as going concern,
         melanjutkan keberlangsungan hidup, selain                                                         in addition to maximizing the profits of the
         memaksimalkan keuntungan para pemegang                                                            shareholders through the optimization of the
         saham melalui optimalisasi saldo utang dan                                                        balance of debt and equity. The Company's
         ekuitas. Struktur modal Perusahaan terdiri dari                                                   capital structure consisted of bank loans
         utang bank (Catatan 15), utang obligasi                                                           (Note 15), bonds payable (Note 21) and lease
         (Catatan 21) dan liabilitas sewa (Catatan 22)                                                     liabilities (Note 22) offset by cash and cash
         diimbangi dengan kas dan setara kas (Catatan                                                      equivalents (Note 5), equity consisting of paid-up
         5), dan ekuitas yang terdiri dari modal yang                                                      share capital stock (Note 23), additional pain-in
         ditempatkan dan disetor (Catatan 23),                                                             capital (Note 23), retained earnings or deficit
         tambahan modal disetor (Catatan 23), saldo                                                        (Note 25), and other component of equity.
         laba (Catatan 25) dan komponen ekuitas
         lainnya.

         Dewan Direksi Perusahaan secara berkala                                                           The Directors of the Company periodically review
         melakukan    telaah    struktur  permodalan                                                       the Company's capital structure. As part of this
         Perusahaan. Sebagai bagian dari telaah ini,                                                       review, the Directors consider the cost of capital
         Dewan Direksi mempertimbangkan biaya                                                              and related risk.
         permodalan dan risiko yang berhubungan.

         Gearing ratio pada tanggal 30 Juni 2023, 31                                                       The gearing ratio as at June 30, 2023, December
         Desember 2022 dan 30 Juni 2022 adalah                                                             31, 2022 and June 30, 2022 is as follows:
         sebagai berikut:

                                                                   30 Juni/             31 Desember/                  30 Juni/
                                                                   June 30,             December 31,                  June 30,
                                                                     2023                   2022                        2022
                                                                      Rp                     Rp                          Rp


         Total Liabilitas                                         7.723.150.498.209     8.066.866.451.302          7.863.574.287.054                                             Total Liability

         Total Ekuitas                                           (2.366.969.197.055)   (2.103.208.499.424)        (1.348.678.856.063)                         Total Equity (Capital Deficiency)

         Rasio Pinjaman Bersih terhadap Modal                                 (3,26)                  (3,84)                     (5,83)                               Net Debt to Equity Ratio


    d.   Risiko Legal                                                                                d. Legal Risk

         Risiko legal berupa tuntutan pidana maupun                                                        Legal risks in the form of criminal charges or civil
         gugatan perdata dapat terjadi apabila terdapat                                                    suits can occur if there is (or is fulfilled) an
         (atau terpenuhinya) unsur perbuatan melawan                                                       element of illegal acts. Actions against the law
                                                      134
Page 138
                                                                            The original financial statements included herein are in
                                                                                                          the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                 PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                         NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022               JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                            30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                               ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                              (UNAUDITED)

         hukum. Perbuatan melawan hukum adalah                        are actions taken by the Company in carrying out
         tindakan yang dilakukan oleh Perusahaan                      operational activities and / or corporate actions
         dalam menjalankan kegiatan operasi dan/atau                  that are contrary to applicable regulations.
         aksi korporasi yang bertentangan dengan
         regulasi yang berlaku.

         Upaya mitigasi yang telah dan akan tetap                     Mitigation efforts that have been and will continue
         dilakukan oleh Perusahaan untuk menghindari                  to be carried out by the Company to avoid illegal
         terjadinya perbuatan melawan hukum adalah                    acts are to review every operational activity and /
         melakukan review atas setiap kegiatan operasi                or corporate action based on applicable
         dan/atau aksi korporasi berdasarkan regulasi                 regulations before deciding to carry out a
         yang      berlaku     sebelum     memutuskan                 transaction. To ensure a controlled legal risk
         menjalankan transaksi. Untuk memastikan                      framework and maintain business continuity, the
         kerangka risiko legal yang terkendali dan tetap              Company carries out:
         menjaga keberlangsungan usaha, Perusahaan
         melakukan:

          − Analisis risiko atas suatu transaksi yang                 − Risk analysis of a transaction to be carried
            akan dilakukan, dan                                         out, and
          − Review atas perjanjian yang akan ditanda-                 − Review of the agreement to be signed.
            tangani.

         Kegiatan review tersebut dapat dilakukan                     The review activity can be carried out in-house or
         secara in-house atau dengan melibatkan                       by involving an external legal consultant.
         konsultan hukum eksternal.

   e.   Pengukuran Nilai Wajar                                   e.   Fair Value Measurements


        Manajemen berpendapat bahwa nilai tercatat                    Management considers the carrying amounts of
        aset dan liabilitas keuangan yang dicatat sebesar             financial assets and financial liabilities recorded
        biaya perolehan diamortisasi dalam laporan                    at amortized cost in the financial statements
        keuangan mendekati nilai wajarnya karena jatuh                approximate their fair values either because of
        tempo dalam jangka pendek, menggunakan                        their short-term maturities, they carry market
        suku bunga pasar, atau dampak diskonto tidak                  rates of interest, or impact of discounting is not
        material.                                                     material.


43. HAL PENTING LAINNYA                                       43. OTHER SIGNIFICANT MATTER

   Berdasarkan Penetapan Sementara PKPU tanggal                  Based on Temporary Decision PKPU dated January
   27 Januari 2022, pengadilan memutuskan                        27, 2022, the Court granted the Company a
   Perusahaan berstatus Penundaan Kewajiban                      Temporary Suspension of Debt Payment Obligations
   Pembayaran Utang (PKPU) Sementara selama                      (PKPU) for 45 (forty-five) days effective from the
   jangka waktu 45 (empat puluh lima) hari sejak tanggal         decision date and has appointed several individuals
   putusan dan telah diangkat beberapa orang oleh                as its administrators. Notwithstanding the PKPU, the
   pengadilan sebagai pengurus WBP. Meskipun                     Company will still be able to continue its operation
   Perusahaan telah berstatus PKPU, Perusahan tetap              under the supervision of the appointed administrators.
   tetap dapat beroperasional dibawah pengawasan                 The Company will continue its effort to reach an
   pengurus yang ditunjuk pengadilan tersebut.                   agreement to provide room for negotiation for both the
   Perusahaan akan melakukan upaya homologasi,                   Company and the vendors to ensure that the
   sehingga dapat memberi ruang kepada Perusahaan                Company will be able to continue as a going concern.
   dan para vendor untuk melakukan negosiasi kepada
   kreditur untuk memastikan kelangsungan usaha
   Perusahaan.

   Pada tanggal 10 Maret 2022, Hakim Pengawas                    On March 10, 2022, the Court granted a permanent
   mengabulkan permohonan perpanjangan masa                      extension of the PKPU period for 75 (seventy-five)
   PKPU Tetap selama 75 (tujuh puluh lima) hari sejak            days from March 10, 2022 until May 24, 2022.
   10 Maret 2022 sampai dengan 24 Mei 2022.



                                                        135
Page 139
                                                                          The original financial statements included herein are in
                                                                                                        the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                        NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022              JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                           30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                              ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                             (UNAUDITED)

   Pada tanggal 24 Mei 2022, Hakim Pengawas                    On May 24, 2022, the Court granted a permanent
   mengabulkan permohonan perpanjangan masa                    extension of the PKPU period for 30 (thirty) days from
   PKPU Tetap selama 30 (tiga puluh) hari sejak                May 24, 2022 until June 24, 2022.
   24 Mei 2022 sampai dengan 24 Juni 2022.

   Berdasarkan Surat Putusan dari Pengadilan                   Based on Decision Letter from the Special Class IA
   Negeri   Jakarta   Pusat   Kelas   IA   Khusus              District Court of Central Jakarta with decision
   No.    W10.U1.2868.Ht.03.VI.2022.RIN    tanggal             letter No. W10.U1.2868.Ht.03.VI.2022.RIN dated
   30 Juni 2022 perihal Pemberitahuan dan                      June 30, 2022, regarding Notification and Submission
   Penyampaian Salinan Penetapan Perkara Niaga                 of Copies of Commercial Case Determinations
   No.      497/Pdt.Sus/PKPU/2021/PN.Niaga.Jkt.Pst,            No. 497/Pdt.Sus/PKPU/2021/ PN.Niaga.Jkt.Pst, the
   Pengadilan telah menyatakan bahwa keadaan                   Court has decided that the Company’s state of
   Penundaan Kewajiban Pembayaran Utang (“PKPU”)               Postponement of Debt Payment Obligations
   Perusahaan telah berakhir dengan restrukturisasi            (“PKPU”) has ended through the restructuring of the
   utang Perusahaan.                                           Company’s debts.

   Berikut ini merupakan ketentuan dan kondisi untuk           The following are the terms and conditions for the
   atas utang retrukturisasi Perusahaan berdasarkan            restructuring of the Company’s debts based on above
   surat keputusan diatas:                                     decision letter:

   Sumber Pelunasan utang dan skema penyelesaian               Sources of debt settlement and settlement schemes
   kepada Kreditur terdiri dari Setiap kas yang tersedia       to creditors consist of any available cash in the
   pada Rekening Penampungan akan dibagikan                    Escrow Account to be distributed to all creditors
   kepada seluruh Kreditur (CFADS) sesuai dengan               (CFADS) in accordance with the cash waterfall
   prinsip cash waterfall berdasarkan urutan yang diatur       principle in the order stipulated in the conciliation
   dalam Perjanjian Perdamaian; Penjualan aset-aset            agreement; sales of the Company's assets;
   Perseroan; Konversi utang Kreditur menjadi Other            conversion of creditors' debts into Other equitys;
   equity; Konversi utang Kreditur menjadi ekuitas atau        conversion of creditor's debt into equity or share
   kepemilikan saham di Perseroan selambat-                    ownership in the Company no later than 6 months
   lambatnya dalam jangka waktu 6 bulan sejak Tanggal          from the Effective Date.
   Berlaku.

   Tranche A                                                   Tranche A

   Skema penyelesaian:                                         Settlement scheme:

   Penyelesaian atas Kreditur dalam golongan Tranche           Settlement of Creditors in the Tranche A class will be
   A akan dilakukan melalui skema Long-Term Loan.              carried out through the Long-Term Loan scheme.

   Golongan Tranche A terdiri dari Kreditur Finansial          Tranche A group consists of Financial Creditors who
   yang hadir dan menyetujui Perjanjian Perdamaian             are present and agree to the Peace Agreement with
   dengan skema penyelesaian sebagai berikut:                  the following settlement scheme:

   1.   Total utang Kreditur Finansial dalam golongan          1.   The total debt of Financial Creditors in the
        Tranche A (“Utang Tranche A Kreditur Finansial”)            Tranche A class (“Tranche A Financial
        akan direstrukturisasi dan diselesaikan oleh                Creditors”) will be restructured and settled by the
        Perseroan melalui skema Long Term Loan                      Company through the Long Term Loan scheme
        dengan pembayaran secara “bullet payment”                   with a “bullet payment” payment in the 17th year
        pada tahun ke-17 sejak Tanggal Berlaku                      from the Effective Date (“Tranche Debt
        (“Jangka Waktu Penyelesaian Utang Tranche A                 Settlement Period” A Financial Creditor”).
        Kreditur Finansial”).

        Perseroan akan mencatatkan Utang Tranche A                  The Company will record the Financial Creditor's
        Kreditur Finansial sebesar nilai wajar sesuai               Tranche A Payable at fair value in accordance
        dengan nilai tahun berjalan. Nilai 14 pencatatan            with the current year's value. The value of the
        Perseroan ini akan dikonfirmasi dengan                      Company's 14 records will be confirmed by
        pencatatan yang dilakukan oleh masing-masing                recordings made by each Financial Creditor in
        Kreditur Finansial sesuai dengan standar                    accordance     with    applicable   accounting
        akuntansi yang berlaku.                                     standards.

        Agen    Pemantau  bersama-sama  dengan                      The Monitoring Agent together with the Company
        Perseroan dan Kreditur Finansial akan                       and the Financial Creditors will conduct an
        melakukan pemeriksaan dan evaluasi atas                     examination and evaluation of the Company's
                                                       136
Page 140
                                                                            The original financial statements included herein are in
                                                                                                          the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                 PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                         NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022               JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                            30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                               ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                              (UNAUDITED)

        kemampuan keuangan Perseroan pada tahun                      financial capability in the 7th year from the
        ke-7 sejak Tanggal Berlaku guna mengetahui                   Effective Date in order to determine the
        kemampuan Perseroan untuk melaksanakan                       Company's ability to pay the Tranche A Payables
        pembayaran Utang Tranche A Kreditur Finansial.               of the Financial Creditors.
        Perseroan      memiliki     opsi     percepatan              The Company has the option of accelerating
        pembayaran (pre-payment) pada tahun ke-10                    payments (pre-payment) in the 10th year from
        sejak Tanggal Berlaku apabila hasil pemeriksaan              the Effective Date if the results of the
        dan evaluasi pada tahun ke-7 sejak Tanggal                   examination and evaluation in the 7th year from
        Berlaku menunjukkan bahwa Perseroan memiliki                 the Effective Date show that the Company has
        kemampuan keuangan untuk menyelesaikan                       the financial capacity to fully settle its obligations
        kewajibannya terhadap Utang Tranche A                        to Financial Creditors' Tranche A Payables.
        Kreditur Finansial secara menyeluruh.

   2.   Seluruh bunga tertunggak baik sebelum maupun            2.   All interest in arrears both before and during the
        pada saat proses PKPU berjalan akan                          PKPU process will be deferred and will be paid
        ditangguhkan (deferred) dan akan dibayarkan                  during the Financial Creditor's Tranche A Debt
        pada Jangka Waktu Penyelesaian Utang                         Settlement Period.
        Tranche A Kreditur Finansial.

   3.   Seluruh denda tertagih terdahulu         kepada         3.   All fines previously billed to Financial Creditors
        Kreditur Finansial akan dihapuskan.                          will be written off.

   4.   Setiap jaminan yang dimiliki oleh Kreditur              4.   Any collateral held by the Financial Creditors in
        Finansial sesuai dengan fasilitas pinjaman                   accordance with the previous loan facility is still
        sebelumnya masih tetap berlaku dan menjadi                   valid and becomes an integral part of this
        satu kesatuan dari Perjanjian Perdamaian ini.                Reconciliation Agreement.

   5.   Perseroan akan melakukan peningkatan atas               5.   The Company will increase the fiduciary security
        jaminan fidusia hak tagih (piutang) yang                     of claims (receivables) which have decreased
        mengalami penurunan pada sampai Perseroan                    until the Company is declared in the PKPU to
        dinyatakan dalam PKPU untuk menjaga nilai                    maintain the guaranteed value of the Financial 15
        terjamin dari Kreditur 15 Finansial pada keadaan             Creditors in their original state in accordance with
        semula sesuai dengan ketentuan yang diatur di                the provisions stipulated in the relevant fiduciary
        akta jaminan fidusia yang relevan setelah                    guarantee deed after the Effective Date.
        Tanggal Berlaku.

   6.   Kreditur Finansial akan diberikan bunga (atau           6.   Financial Creditors will be given interest (or other
        istilah lain yang mana berlaku untuk Kreditur                terms which apply to Financial Creditors who
        Finansial yang menjalankan kegiatan usahanya                 carry out their business activities based on sharia
        berdasarkan prinsip syariah) yang berlaku                    principles) which are valid during the
        selama pelaksanaan Perjanjian Perdamaian ini                 implementation of this Reconciliation Agreement
        yang akan dibayarkan sesuai dengan CFADS                     which will be paid in accordance with CFADS
        dengan ketentuan sebagai berikut: i. Pada tahun              with the following conditions: i. In the 1st to 9th
        ke 1 sampai 9 setelah Tanggal Berlaku, sebesar               year after the Effective Date, 2% per annum of
        2% pertahun dari Utang Tranche A Kreditur                    the Financial Creditor's Tranche A Payable; ii. In
        Finansial; ii. Pada tahun ke 10 sampai 13 setelah            the 10th to 13th years after the Effective Date,
        Tanggal Berlaku, sebesar 3% per-tahun dari                   3% per annum of the Financial Creditor's
        Utang Tranche A Kreditur Finansial; dan iii. Di              Tranche A Payable; and iii. Over the 14th year
        atas tahun ke 14 setelah Tanggal Berlaku,                    after the Effective Date, 4% per annum of
        sebesar 4% per-tahun dari Utang Tranche A                    Financial Creditor Tranche A Payable. The
        Kreditur Finansial. Pembayaran bunga di atas                 above interest payments will be made on the
        akan dilakukan pada tanggal 25 yang jatuh pada               25th which falls on every 6 months of the current
        setiap 6 bulan dari tahun berjalan setelah                   year after the Effective Date subject to the
        Tanggal Berlaku dengan tunduk pada                           availability of CFADS owned by the Company. In
        ketersediaan CFADS yang dimiliki oleh                        the event that the interest payment date
        Perseroan. Dalam hal tanggal pembayaran                      coincides with a holiday including Saturday or a
        bunga tersebut bertepatan dengan hari libur                  national holiday, the interest payment will be
        termasuk hari Sabtu atau hari libur nasional,                made on the next working day.
        pembayaran bunga tersebut akan dilakukan
        pada hari kerja berikutnya.



                                                        137
Page 141
                                                                           The original financial statements included herein are in
                                                                                                         the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                 PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                         NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022               JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                            30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                               ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                              (UNAUDITED)

       i.    Pada tahun ke 1 sampai 9 setelah Tanggal                i.iv. In the 1st to 9th year after the Effective Date,
             Berlaku, sebesar 2% pertahun dari Utang                       2% per annum of the Financial Creditor's
             Tranche A Kreditur Finansial                                  Tranche A Payable
       ii.   Pada tahun ke 10 sampai 13 setelah                      ii. In the 10th to 13th years after the Effective
             Tanggal Berlaku, sebesar 3% per-tahun dari                    Date, 3% per annum of the Financial
             Utang Tranche A Kreditur Finansial; dan                       Creditor's Tranche A Payable; and
      iii.   Di atas tahun ke 14 setelah Tanggal                    iii. Over the 14th year after the Effective Date,
             Berlaku, sebesar 4% per-tahun dari Utang                      4% per annum of Financial Creditor Tranche
             Tranche A Kreditur Finansial.                                 A Payable.

       Pembayaran bunga di atas akan dilakukan pada                 The above interest payments will be made on the
       tanggal 25 yang jatuh pada setiap 6 bulan dari               25th which falls on every 6 months of the current
       tahun berjalan setelah Tanggal Berlaku dengan                year after the Effective Date subject to the
       tunduk pada ketersediaan CFADS yang dimiliki                 availability of CFADS owned by the Company. In
       oleh Perseroan. Dalam hal tanggal pembayaran                 the event that the interest payment date
       bunga tersebut bertepatan dengan hari libur                  coincides with a holiday including Saturday or a
       termasuk hari Sabtu atau hari libur nasional,                national holiday, the interest payment will be
       pembayaran bunga tersebut akan dilakukan                     made on the next working day.
       pada hari kerja berikutnya.

       Tranche B                                                    Tranche B

       Skema penyelesaian:                                          Settlement scheme:

       Penyelesaian atas Kreditur dalam golongan                    Settlement of Creditors in the Tranche B class
       Tranche B akan dibayarkan secara tunai dengan                will be paid in cash with payments sourced from
       pembayaran yang bersumber dari CFADS.                        CFADS.
       Golongan Tranche B terdiri dari sebagai berikut:             The Tranche B group consists of the following:

        i.   Kreditur Pemegang Obligasi yang tidak                   i.   Bondholder Creditors who do not agree to
             menyetujui Perjanjian Perdamaian ini;                        this Reconciliation Agreement;
       ii.   Kreditur Dagang Aktif;                                 ii.   Active Trade Creditors;
      iii.   Kreditur Dagang Terdahulu; dan                        iii.   Former Trade Creditors; and
      iv.    Kreditur Finansial yang tidak hadir dan/atau          iv.    Financial Creditors who are not present
             tidak menyetujui Perjanjian Perdamaian                       and/or do not agree to the Reconciliation
             (“Kreditur Finansial Lain”),                                 Agreement (“Other Financial Creditors”),

       yang akan diselesaikan dengan              skema             which will be solved by the following settlement
       penyelesaian sebagai berikut:                                scheme:

       Kreditur Pemegang Obligasi                                   Bondholder Creditors

       1.    Total utang Kreditur Pemegang Obligasi                 1.    The total debt of the Bondholders Creditors
             yang akan dibayarkan melalui golongan                        to be paid through the Tranche B class is
             Tranche B adalah sebesar 15% dari total                      15% of the total portion of the debts of the
             porsi utang Kreditur Pemegang Obligasi                       Bondholders Creditors (“Tranche B Debts of
             (“Utang Tranche B Kreditur Pemegang                          the Bondholders Creditors”).
             Obligasi”).
       2.    Kewajiban      dari    Perseroan      atas             2.    The obligation of the Company for
             penyelesaian atas Utang Tranche B Kreditur                   settlement of the Tranche B Debt of the
             Pemegang Obligasi akan dilakukan pada                        Bondholder Creditors will be carried out in
             tahun ke-5 sejak Tanggal Berlaku dan akan                    the 5th year from the Effective Date and will
             diselesaikan oleh Perseroan pada tahun ke                    be settled by the Company in the 6th year
             6 sejak Tanggal Berlaku yang akan                            from the Effective Date which will be sourced
             bersumber dari CFADS.                                        from CFADS.
       3.    Atas Utang Tranche B Kreditur Pemegang                 3.    On Tranche B Loans, Bondholders will be
             Obligasi akan diberikan bunga sebesar 2%                     given an interest of 2% per annum during the
             per-tahun selama pelaksanaan Perjanjian                      implementation of this Reconciliation
             Perdamaian ini yang akan dibayarkan                          Agreement which will be paid in accordance
             sesuai dengan CFADS.                                         with CFADS.



                                                        138
Page 142
                                                                         The original financial statements included herein are in
                                                                                                       the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                        NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022              JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                           30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                              ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                             (UNAUDITED)

       4.   Sisa total Utang Tranche B Kreditur                    4.   The remaining total Loans of Tranche B
            Pemegang Obligasi akan diselesaikan                         Creditors of Bondholders will be settled
            melalui Tranche C di bawah.                                 through Tranche C below.

       Kreditur Dagang Aktif                                       Active Trade Creditors

       1.   Total utang Kreditur Dagang Terdahulu yang             1.   The total debt of the Past Trade Creditors to
            akan dibayarkan melalui golongan Tranche                    be paid through the Tranche B class is 5%
            B adalah sebesar 5% dari total porsi utang                  of the total portion of the debts of the
            Kreditur Dagang Terdahulu (“Utang Tranche                   Previous Trade Creditors (“Tranche B
            B Kreditur Dagang Terdahulu”).                              Payables of Previous Trade Creditors”).
       2.   Kewajiban       dari    Perseroan       atas           2.   The Company's obligations for settlement of
            penyelesaian atas Utang Tranche B Kreditur                  the Tranche B Payables of Previous Trade
            Dagang Terdahulu akan diselesaikan oleh                     Creditors will be settled by the Company
            Perseroan dalam jangka waktu 5 tahun                        within 5 years from the Effective Date which
            sejak Tanggal Berlaku yang akan                             will be sourced from CFADS.
            bersumber dari CFADS.
       3.   Sisa total porsi utang dari Kreditur Dagang            3.   The remaining total debt portion of the
            Terdahulu akan diselesaikan melalui                         Former Trade Creditors will be settled
            Tranche D di bawah.                                         through Tranche D below.

       Kreditur Dagang Terdahulu                                   Former Trade Creditors

       1. Total utang Kreditur Dagang Terdahulu yang               1. The total debt of the Past Trade Creditors to
          akan dibayarkan melalui golongan Tranche                    be paid through the Tranche B class is 5% of
          B adalah sebesar 5% dari total porsi utang                  the total portion of the debts of the Previous
          Kreditur Dagang Terdahulu (“Utang Tranche                   Trade Creditors (“Tranche B Payables of
          B Kreditur Dagang Terdahulu”).                              Previous Trade Creditors”).
       2. Kewajiban dari Perseroan atas penyelesaian               2. The Company's obligations for settlement of
          atas Utang Tranche B Kreditur Dagang                        the Tranche B Payables of Previous Trade
          Terdahulu akan diselesaikan oleh Perseroan                  Creditors will be settled by the Company
          dalam jangka waktu 5 tahun sejak Tanggal                    within 5 years from the Effective Date which
          Berlaku yang akan bersumber dari CFADS.                     will be sourced from CFADS.
       3. Sisa total porsi utang dari Kreditur Dagang              3. The remaining total debt portion of the
          Terdahulu akan diselesaikan melalui                         Former Trade Creditors will be settled
          Tranche D di bawah.                                         through Tranche D below.

       Kreditur Finansial Lain                                     Other Financial Creditors

       1.   Total utang Kreditur Finansial Lain yang               1.   The total debt of Other Financial Creditors to
            akan dibayarkan melalui golongan Tranche                    be paid through the Tranche B class is 15%
            B adalah sebesar 15% dari total porsi utang                 of the total portion of the debt to Other
            Kreditur Finansial Lain (“Utang Tranche B                   Financial Creditors (“Tranche B Payables to
            Kreditur Finansial Lain”).                                  Other Financial Creditors”).
       2.   Kewajiban      dari      Perseroan     atas            2.   The obligation of the Company for
            penyelesaian atas Utang Tranche B Kreditur                  settlement of the Tranche B Debt of Other
            Finansial Lain akan dilakukan pada tahun                    Financial Creditors will be carried out in the
            ke-5 sejak Tanggal Berlaku dan akan                         5th year from the Effective Date and will be
            diselesaikan oleh Perseroan dalam jangka                    settled by the Company within 6 years from
            waktu 6 tahun sejak Tanggal Berlaku yang                    the Effective Date which will be sourced from
            akan bersumber dari CFADS.                                  CFADS.
       3.   Sisa total Utang Tranche B Kreditur                    3.   The remaining total Debt of Tranche B Other
            Finansial Lain akan diselesaikan melalui                    Financial Creditors will be settled through
            Tranche C di bawah.                                         Tranche C below.

       Tranche C                                                   Tranche C

       Skema penyelesaian:                                         Settlement scheme:

       Penyelesaian atas Kreditur dalam golongan                   Tranche C Settlement of Creditors in the Tranche
       Tranche C dilakukan melalui konversi utang                  C class is carried out through the conversion of
       menjadi MCB.                                                debt into MCB.

                                                       139
Page 143
                                                                        The original financial statements included herein are in
                                                                                                      the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                               PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                       NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022             JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                          30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                             ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                            (UNAUDITED)


       Golongan Tranche C terdiri dari sebagai berikut:           Tranche C group consists of the following:

       1.   Kreditur Pemegang Obligasi; dan                       1.   Bond Holder Creditors; and
       2.   Kreditur Finansial Lain,                              2.   Other Financial Creditors,

       yang akan diselesaikan dengan            skema             which will be solved by the following settlement
       penyelesaian sebagai berikut:                              scheme:

       Kreditur Pemegang Obligasi                                 Bondholder Creditors

       1.   Total utang Kreditur Pemegang Obligasi                1.   The total debt of the Bondholders Creditors
            yang akan dibayarkan melalui golongan                      to be paid through the Tranche C class is
            Tranche C adalah sebesar 85% dari total                    85% of the total portion of the debts of the
            porsi utang Kreditur Pemegang Obligasi                     Bondholders Creditors (“Tranche C Debts of
            (“Utang Tranche C Kreditur Pemegang                        the Bondholders Creditors”).
            Obligasi”).

       2.   Perseroan akan merubah total jumlah utang             2.   The Company will change the total amount
            tertunggak dari Utang Tranche C Kreditur                   of debt in arrears from Tranche C Debt to
            Pemegang Obligasi menjadi instrumen MCB                    Bondholders'     Creditors      into     MCB
            yang memiliki opsi konversi menjadi saham                  instruments which have the option of
            baru yang diterbitkan oleh Perseroan (“MCB                 conversion into new shares issued by the
            Tranche C Kreditur Pemegang Obligasi”).                    Company ("MCB Tranche C. Bondholders'
            Perseroan berhak untuk mengkonversi MCB                    Creditors"). The Company has the right to
            Tranche C Kreditur Pemegang Obligasi                       convert MCB Tranche C Bondholders
            menjadi saham baru yang diterbitkan oleh                   Creditors into new shares issued by the
            Perseroan dalam jangka waktu 10 tahun                      Company within a period of 10 years from
            sejak Perseroan mendapatkan seluruh                        the time the Company obtains all required
            persetujuan korporasi yang dibutuhkan                      corporate approvals ("Term of MCB Tranche
            (“Jangka Waktu MCB Tranche C Kreditur                      C     Bondholders     Creditors")    ("Shares
            Pemegang Obligasi”) (“Saham Hasil                          Converted by Creditors to Bondholders") ").
            Konversi Kreditur Pemegang Obligasi”).

       3.   Perseroan dan/atau suatu pihak ketiga                 3.   The Company and/or a third party may
            dapat melakukan pembelian kembali atas                     repurchase MCB Tranche C Bondholders,
            MCB Tranche C Kreditur Pemegang                            either partially or wholly.
            Obligasi, baik sebagian maupun seluruhnya.

       4.   Pada saat Perseroan hendak melaksanakan               4.   When the Company wishes to convert MCB
            konversi atas MCB Tranche C Kreditur                       Tranche C from Bondholders into Shares
            Pemegang Obligasi menjadi Saham Hasil                      from     the    Converted    Creditors   to
            Konversi Kreditur Pemegang Obligasi, nilai                 Bondholders, the nominal value of the
            nominal dari Saham Hasil Konversi Kreditur                 Converted Shares from Bondholders
            Pemegang Obligasi pada Jangka Waktu                        Creditors during the MCB Tranche C Period
            MCB Tranche C Kreditur Pemegang                            of Bondholders will be calculated based on
            Obligasi akan dihitung berdasarkan volume                  the volume weighted average price (VWAP)
            weighted average price (VWAP) selama 45                    for 45 days before the Tranche C Loans of
            hari sebelum Utang Tranche C Kreditur                      the Bondholders Creditors have been
            Pemegang Obligasi telah secara efektif                     effectively converted into MCB Tranche C of
            dikonversi menjadi MCB Tranche C Kreditur                  the Bondholders' Creditors.
            Pemegang Obligasi.

       5.   Dengan tetap mempertimbangkan kondisi                 5.   By taking into account the conditions of the
            dari Perseroan, pada tahun ke-10 sejak                     Company, in the 10th year since the
            instrumen MCB Tranche C Kreditur                           issuance of the Bondholder Creditor MCB
            Pemegang Obligasi diterbitkan, Perseroan                   Tranche C instrument, the Company has the
            berhak untuk mengkonversi MCB Tranche C                    right to convert the Bondholder Creditor's
            Kreditur Pemegang Obligasi menjadi Saham                   MCB Tranche C into Convertible Shares
            Hasil Konversi Kreditur Pemegang Obligasi.                 from the Bondholder Creditor.



                                                      140
Page 144
                                                                         The original financial statements included herein are in
                                                                                                       the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                        NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022              JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                           30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                              ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                             (UNAUDITED)

       6.   Kreditur   Pemegang    Obligasi    dapat               6.   The Bondholder Creditors may transfer the
            mengalihkan MCB Tranche C Kreditur                          Bondholder Creditor MCB Tranche C to a
            Pemegang Obligasi kepada pihak ketiga                       third party during the MCB Tranche C
            selama Jangka Waktu MCB Tranche C                           Bondholder Creditor period, either partially
            Kreditur Pemegang Obligasi baik sebagian                    or completely.
            maupun seluruhnya.

       Kreditur Finansial Lain                                     Other Financial Creditors

       1.   Total utang Kreditur Finansial Lain yang               1.   The total debt of Other Financial Creditors to
            akan dibayarkan melalui golongan Tranche                    be paid through the Tranche C class is 85%
            C adalah sebesar 85% dari total porsi utang                 of the total portion of the debt of Other
            Kreditur Finansial Lain (“Utang Tranche C                   Financial Creditors (“Tranche C Payables of
            Kreditur Finansial Lain”).                                  Other Financial Creditors”).

       2.   Perseroan akan merubah total jumlah utang              2.   The Company will change the total amount
            tertunggak dari Utang Tranche C Kreditur                    of outstanding debt from Tranche C
            Finansial Lain menjadi instrumen MCB yang                   Payables to Other Financial Creditors into
            memiliki opsi konversi menjadi saham baru                   MCB instruments which have the option of
            yang diterbitkan oleh Perseroan (“MCB                       conversion into new shares issued by the
            Tranche C Kreditur Finansial Lain”).                        Company (“MCB Tranche C Other Financial
            Perseroan berhak untuk mengkonversi MCB                     Creditors”). The Company has the right to
            Tranche C Kreditur Finansial Lain menjadi                   convert MCB Tranche C Other Financial
            saham baru yang diterbitkan oleh Perseroan                  Creditors into new shares issued by the
            dalam jangka waktu 10 tahun sejak                           Company within a period of 10 years from
            Perseroan        mendapatkan       seluruh                  the time the Company obtains all required
            persetujuan korporasi yang dibutuhkan                       corporate approvals (“Term of MCB Tranche
            (“Jangka Waktu MCB Tranche C Kreditur                       C Other Financial Creditors”) (“Shares
            Finansial Lain”) (“Saham Hasil Konversi                     Conversion of Other Financial Creditors”).
            Kreditur Finansial Lain”).

       3.   Perseroan dan/atau suatu pihak ketiga                  3.   The Company and/or a third party may
            dapat melakukan pembelian kembali atas                      repurchase MCB Tranche C Other Financial
            MCB Tranche C Kreditur Finansial Lain, baik                 Creditors, either partially or wholly.
            sebagian maupun seluruhnya.

       4.   Pada saat Perseroan hendak melaksanakan                4.   When the Company wishes to convert MCB
            konversi atas MCB Tranche C Kreditur                        Tranche C Other Financial Creditors into
            Finansial Lain menjadi Saham Hasil                          Shares from the Conversion of 21 Other
            Konversi 21 Kreditur Finansial Lain, nilai                  Financial Creditors, the nominal value of the
            nominal dari Saham Hasil Konversi Kreditur                  Convertible Shares from Other Financial
            Finansial Lain pada Jangka Waktu MCB                        Creditors during the MCB Tranche C Period
            Tranche C Kreditur Finansial Lain akan                      of Other Financial Creditors will be
            dihitung berdasarkan volume-weighted                        calculated based on the volume-weighted
            average price (VWAP) selama 45 hari                         average price (VWAP) ) for 45 days before
            sebelum Utang Tranche C Kreditur Finansial                  the Tranche C Payables of Other Financial
            Lain telah secara efektif dikonversi menjadi                Creditors have been effectively converted
            MCB Tranche C Kreditur Finansial Lain.                      into MCB Tranche C Other Financial
                                                                        Creditors.

       5.   Dengan tetap mempertimbangkan kondisi                  5.   Taking into account the condition of the
            dari Perseroan, pada tahun ke-10 sejak                      Company, in the 10th year since the
            instrumen MCB Tranche C Kreditur                            issuance of the MCB Tranche C Other
            Finansial Lain diterbitkan, Perseroan berhak                Financial Creditor instrument, the Company
            untuk mengkonversi MCB Tranche C                            has the right to convert the MCB Tranche C
            Kreditur Finansial Lain menjadi Saham Hasil                 Other Financial Creditor into Shares from
            Konversi Kreditur Finansial Lain.                           the Conversion of Other Financial Creditors.

       6.   Kreditur Finansial Lain dapat mengalihkan              6.   Other Financial Creditors may transfer MCB
            MCB Tranche C Kreditur Finansial Lain                       Tranche C Other Financial Creditors to third
            kepada pihak ketiga selama Jangka Waktu                     parties during the Term of MCB Tranche C
            MCB Tranche C Kreditur Finansial Lain baik                  Other Financial Creditors either partially or
            sebagian maupun seluruhnya.                                 completely.
                                                       141
Page 145
                                                                       The original financial statements included herein are in
                                                                                                     the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                              PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                      NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022            JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                         30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                            ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                           (UNAUDITED)


       Tranche D                                                 Tranche D

       Skema penyelesaian:                                       Settlement scheme:

       Penyelesaian atas Kreditur dalam golongan                 Tranche D Settlement of Creditors in the Tranche
       Tranche D dilakukan melalui Konversi Ekuitas.             D class is carried out through Equity Conversion.

       Golongan Tranche D terdiri dari sebagai berikut:          Tranche D group consists of the following:

       1)   Kreditur Dagang Aktif; dan                           1)   Active Trade Creditors; and
       2)   Kreditur Dagang Terdahulu,                           2)   Former Trade Creditors,

       yang akan diselesaikan dengan            skema            which will be solved by the following settlement
       penyelesaian sebagai berikut:                             scheme:

       Kreditur Dagang Aktif                                     Active Trade Creditors

       1.   Total utang Kreditur Dagang Aktif yang akan          1.   The total debt of Active Trade Creditors to be
            dibayarkan melalui golongan Tranche D                     paid through the Tranche D class is 65% of
            adalah sebesar 65% dari total porsi utang                 the total portion of the debts of Active Trade
            Kreditur Dagang Aktif (“Utang Tranche D                   Creditors (“Tranche D of Active Trade
            Kreditur Dagang Aktif”).                                  Creditors”).

       2.   Perseroan akan merubah jumlah utang                  2.   The Company will change the amount of
            tertunggak dari Utang Tranche D Kreditur                  debt in arrears from Tranche D Loans of
            Dagang Aktif melalui Konversi Ekuitas                     Active Trade Creditors through Equity
            segera setelah Perseroan mendapatkan                      Conversion as soon as the Company
            seluruh   persetujuan   korporasi  yang                   obtains all required corporate approvals.
            dibutuhkan.

       3.   Kreditur Dagang Aktif memiliki opsi untuk            3.   Active Trade Creditors have the option to
            meningkatkan porsi penyelesaian Konversi                  increase the portion of the Equity
            Ekuitas menjadi di atas 65% dari Utang                    Conversion settlement to above 65% of
            Tranche D Kreditur Dagang Aktif. Apabila                  Active Trade Creditors' Tranche D Payables.
            Kreditur Dagang Aktif hendak untuk                        If the Active Trading Creditor wishes to
            meningkatkan porsi penyelesaian Konversi                  increase the portion of the Equity
            Ekuitas sebagaimana disebutkan di atas,                   Conversion settlement as stated above, the
            Kreditur Dagang Aktif tersebut wajib                      Active Trading Creditor is required to send a
            mengirimkan suatu surat permintaan tertulis               written request to the Company within a
            kepada Perseroan dalam jangka waktu                       period of no later than 60 days after the
            paling lambat 60 hari setelah Tanggal                     Effective Date.
            Berlaku.

       4.   Harga saham per-lembarnya sehubungan                 4.   The share price per share in connection with
            dengan Konversi Ekuitas dari Utang                        the Equity Conversion of Active Trade
            Tranche D Kreditur Dagang Aktif akan                      Lenders Tranche D Payables will be
            dihitung berdasarkan volume-weighted                      calculated based on 45 days volume-
            average price (VWAP) selama 45 hari.                      weighted average price (VWAP).

       Kreditur Dagang Terdahulu                                 Former Trade Creditors

       1.   Total utang Kreditur Dagang Terdahulu yang           1.   The total debt of the Past Trade Creditors to
            akan dibayarkan melalui golongan Tranche                  be paid through the Tranche D class is 95%
            D adalah sebesar 95% dari total porsi utang               of the total portion of the debts of the
            Kreditur Dagang Terdahulu (“Utang Tranche                 Previous Trade Creditors (“Tranche D of
            D Kreditur Dagang Terdahulu”).                            Previous Trade Creditors”).

       2.   Perseroan akan merubah jumlah utang                  2.   The Company will change the amount of
            tertunggak dari Utang Tranche D Kreditur                  outstanding debt from the Tranche D
            Dagang Terdahulu melalui Konversi Ekuitas                 Payable of the Former Trade Creditors
            segera setelah Perseroan mendapatkan                      through Equity Conversion as soon as the
            seluruh   persetujuan   korporasi   yang                  Company obtains all required corporate
            dibutuhkan                                                approvals.
                                                     142
Page 146
                                                                        The original financial statements included herein are in
                                                                                                      the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                              PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                      NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022            JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                         30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                            ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                           (UNAUDITED)


       3.   Harga saham per-lembarnya sehubungan                  3.   The share price per share in connection with
            dengan Konversi Ekuitas dari Utang                         the Equity Conversion of the Tranche D Debt
            Tranche D Kreditur Dagang Terdahulu akan                   of Former Trade Lenders will be calculated
            dihitung berdasarkan volume-weighted                       based on 45 days volume-weighted average
            average price (VWAP) selama 45 hari.                       price (VWAP).

       Tranche E                                                  Tranche E

       Skema penyelesaian:                                        Settlement scheme:

       Penyelesaian atas Kreditur dalam golongan                  Tranche E Settlement of Creditors in the Tranche
       Tranche E akan direstrukturisasi menjadi obligasi          E class will be restructured into long-term bonds.
       jangka panjang.

       Golongan Tranche E terdiri dari Kreditur                   The Tranche E group consists of Bondholder
       Pemegang Obligasi yang mendukung Perjanjian                Creditors who support this Settlement
       Perdamaian ini akan diselesaikan dengan skema              Agreement which will be settled with the following
       penyelesaian sebagai berikut:                              settlement scheme:

       1.   Total utang Kreditur Pemegang Obligasi                1.   The total debt of the Bondholder Creditors in
            dalam golongan Tranche E (“Utang Tranche                   the Tranche E class (“Tranche E Loans to
            E Kreditur Pemegang Obligasi”) akan                        the Bondholder Creditors”) will be
            direstrukturisasi menjadi obligasi jangka                  restructured into long-term bonds and
            panjang dan diselesaikan oleh Perseroan                    settled by the Company with a “bullet
            dengan      pembayaran    secara    “bullet                payment” in the 17th year from the Effective
            payment” pada tahun ke-17 sejak Tanggal                    Date (“Term of Debt Tranche E Bondholders
            Berlaku (“Jangka Waktu Utang Tranche E                     Creditors”).
            Kreditur Pemegang Obligasi”).

       2.   Agen Pemantau bersama-sama dengan                     2.   The Monitoring Agent together with the
            Perseroan dan Kreditur Pemegang Obligasi                   Company and the Bondholders' Creditors
            akan melakukan pemeriksaan dan evaluasi                    will conduct an examination and evaluation
            atas kemampuan keuangan Perseroan pada                     of the Company's financial capability in the
            tahun ke-7 sejak Tanggal Berlaku guna                      7th year from the Effective Date in order to
            mengetahui kemampuan Perseroan untuk                       determine the Company's ability to pay the
            melaksanakan pembayaran Utang Tranche                      Tranche E Debts of the Bondholders'
            E Kreditur Pemegang Obligasi. Perseroan                    Creditors. The Company has the option of
            memiliki opsi percepatan pembayaran (pre-                  accelerating payments (pre-payment) in the
            payment) pada tahun ke-10 sejak Tanggal                    10th year from the Effective Date if the
            Berlaku apabila hasil pemeriksaan dan                      results of the examination and evaluation in
            evaluasi pada tahun ke-7 sejak Tanggal                     the 7th year from the Effective Date show
            Berlaku menunjukkan bahwa Perseroan                        that the Company has the financial capacity
            memiliki kemampuan keuangan untuk                          to settle its obligations to the Tranche E Debt
            menyelesaikan kewajibannya terhadap                        of the Bondholders, either partially or
            Utang Tranche E Kreditur Pemegang                          entirely.
            Obligasi baik sebagian maupun seluruhnya.

       3.   Kreditur  Pemegang      Obligasi    dalam             3.   The Bondholder Creditors in the Tranche E
            golongan Tranche E akan diberikan bunga                    class will be given an interest of 1% per year
            sebesar 1% per-tahun dari Utang Tranche E                  from the Tranche E Loans of the Bondholder
            Kreditur Pemegang Obligasi selama                          Creditors during the implementation of this
            pelaksanaan Perjanjian Perdamaian ini                      Reconciliation Agreement which will be paid
            yang akan dibayarkan sesuai dengan                         in accordance with CFADS.
            CFADS.


44. KELANGSUNGAN         USAHA      DAN     RENCANA        44. GOING CONCERN AND MANAGEMENT’S PLAN
    MANAJEMEN

   Total liabilitas jangka pendek Perusahaan telah            The Company’s total current liabilities exceeded total
   melampaui total aset sebesar Rp337.710.525.649             assets by Rp337,710,525,649 resulting to a capital
   sehingga       menyebabkan     defisiensi  modal           deficiency amounting to Rp2,086,767,027,693 as oft
   sebesar      Rp2.086.767.027.693    pada  tanggal          June 30, 2023. These conditions arose due to several
                                                   143
Page 147
                                                                          The original financial statements included herein are in
                                                                                                        the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                        NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022              JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                           30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                              ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                             (UNAUDITED)

   30 Juni 2023. Kondisi ini timbul akibat dari beberapa       problematic projects that required funding from debt,
   proyek bermasalah yang memerlukan pendanaan                 which necessitated the restructuring of loans and
   dari utang, sehingga diperlukan restrukturisasi             entering into a standstill period and cash waterfall
   pinjaman, dan memasuki masa standstill dan                  arrangements by the Company.
   pengaturan cash waterfall oleh Perusahaan.

   Kondisi tersebut, antara lain, mengindikasikan              These conditions, among others, indicate the
   adanya ketidakpastian material yang dapat                   existence of a material uncertainty that may cast
   menimbulkan       keraguan  signifikan   terhadap           significant doubt on the Company’s ability to continue
   kemampuan       Perusahaan   untuk     melanjutkan          as a going concern and, therefore, it may be unable
   kelangsungan usahanya dan, oleh karena itu,                 to realize its assets and discharge its liabilities in the
   Perusahaan mungkin tidak dapat merealisasikan aset          normal course of business. The financial statements
   dan melunasi kewajibannya dalam kegiatan usaha              do not include any adjustments that might result from
   normal. Laporan keuangan tidak mencakup                     the outcome of this uncertainty.
   penyesuaian yang mungkin timbul sebagai akibat dari
   ketidakpastian tersebut.

   Manajemen Perusahaan secara aktif memantau                  Management is actively monitoring the Company’s
   situasi di atas dan mengeksplorasi dan menjalankan          financial condition and performance while continually
   strategi-strategi berikut sebagai upaya dalam               exploring and implementing strategies in an effort to
   mengatasi potensi dampak buruk pada kinerja                 overcome potential adverse impacts on the Group’s
   keuangan dan keberlangsungan usaha Perusahaan,              financial performance and business continuity,
   antara lain sebagai berikut:                                including the following:

   −   Melakukan efisiensi biaya dan optimalisasi               −   Carry out cost efficiency measures and optimize
       belanja modal (capital expenditure);                         capital expenditures;
   −   Memaksimalkan penyelesaian sisa nilai kontrak            −   Maximizing the completion of the remaining
       tahun 2022 yang belum dikerjakan Perusahaan                  contract value in 2022 that has not been
       sebesar Rp1,1 triliun di tahun 2023;                         executed by the Company amounting to
                                                                    Rp1.1 trillion in 2023;
   −   Perusahaan      menetapkan       target    untuk         −   Pursuing a target of new contract value in 2023
       mendapatkan Nilai Kontrak Baru tahun 2023                    of Rp3.8 trillion. During the first quarter (Q1) of
       sebesar Rp3,8 triliun. Pada TW 1 2023                        2023, the Company has obtained new contract
       perusahaan telah mendapatakan nilai kontrak                  value amounting to Rp411 billion, achieving the
       baru sebesar Rp411 miliar telah mencapai target              Q1 target of Rp371 billion. The composition of
       dari TW I sebesar Rp371 miliar. Komposisi                    the new project segment and the value of
       segmen proyek baru dan nilai kontrak dikelola                contracts that will be managed by the Company
       Perusahaan tahun 2023 terdiri dari proyek                    in 2023 consists of external and internal
       eksternal dan internal. Proyek internal adalah               projects. Internal projects are projects carried
       proyek yang dikerjakan oleh Perusahaan,                      out by the Company, wherein the project owner
       dimana pemberi kerja berasal dari PT Waskita                 is PT Waskita Karya (Persero) Tbk or any
       Karya (Persero) Tbk. Sedangkan proyek                        entities within its group. Meanwhile, external
       eksternal adalah proyek yang dikerjakan oleh                 projects are projects undertaken by the
       Perusahaan, dimana pemberi kerja proyek                      Company, wherein the project owner is not PT
       bukan berasal dari PT Waskita Karya (Persero)                Waskita Karya (Persero) Tbk or any entities
       Tbk seperti pihak Swasta, Kementrian Pekerjaan               within its group, such as the private sector, the
       Umum dan Perumahan Rakyat (KPUPR),                           Ministry for Publik Works and Human
       Kementerian Badan Usaha Milik Negara                         Settlements (KPUPR), the Ministry of Ministry of
       (KBUMN) dan Badan Usaha Milik Daerah                         State-owned       Enterprises (KBUMN)          and
       (BUMD);                                                      Regional Owned Enterprises (BUMD);
   −   Menggarap Pasar Eksternal dengan menangkap               −    Working on the external market by seizing
       peluang dari Swasta, BUMN dan anak                           opportunities from the private sector, BUMN and
       Perusahaannya serta meningkatkan partisipasi                 its subsidiaries and increasing participation in
       di proyek Pemerintah;                                        government projects;
   −   Menjual competitiveness dengan pasar potensial           −   Selling competitiveness with potential markets,
       khususnya dengan skema kerja sama dengan                     especially with cooperation schemes with
       anak       perusahaan        BUMN,       potensi             BUMN subsidiaries, the potential for developing
       pengembangan mobile plant pada project-based                 mobile plants on project-based plant and having
       plant serta memiliki unit produksi dengan pabrik             production units with a factory that has low-cost
       yang Cost Of Good Material (COGM) murah                      Cost of Good Material (COGM) at West Java
       pada Program Integrasi Plant Jawa Barat dan                  Plant Integration Program and lower distribution
                                                                    costs at Bojonegara Pier Program;
                                                       144
Page 148
                                                                           The original financial statements included herein are in
                                                                                                         the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                        NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022              JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                           30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                              ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                             (UNAUDITED)

       biaya distribusinya murah pada Program
       Dermaga Bojonegara;
   −   Meningkatkan agilitas dan daya saing degan               −    Increase agility and competitiveness by
       meningkatkan digitalisasi di proses bisnis (SAP),             increasing digitalization in business processes
       melakukan desentralisasi dan divestasi plant dan              (SAP), decentralizing and divesting plants and
       batching plant;                                               batching plants;
   −   Perusahaan akan mengembangkan produk baru                −    The Company will develop new products that are
       yang market-fit secara nasional (bangunan                     market-fit nationally (modular buildings, RC Pipe
       modular, RC Pipe Sewerage), meningkatkan                      Sewerage), increase excellence through locally
       keunggulan melalui produk yang unik secara                    unique products (Box Culvert, U-ditch), and
       lokal (Box Culvert, U-ditch), dan memasarkan                  market new products (SPRIG-WBP, BJR, power
       produk baru (SPRIG-WBP, BJR, Tiang Listrik);                  pole);
   −   Perusahaan melakukan kolaborasi dengan                   −    The Company collaborates by improving the
       meningkatkan pengelolaan shared resources                     management of shared resources with external
       dengan eksternal dan meningkatkan sinergi                     partners and increasing cross-divisional
       lintas divisi;                                                synergies;
   −   Menjaga arus kas operasional positif.                    −    Maintain positive operating cash flows.
   −   Melakukan konversi utang usaha dan utang                 −    Converting accounts payable and bonds
       obligasi ke ekuitas sesuai amanat putusan                     payable to equity according to the mandate of
       homologasi untuk memperbaiki ekuitas.                         the homologation decision to improve the
                                                                     Company’s financial position.

   Kemampuan Perusahaan untuk mempertahankan                    The Company’s ability to maintain its business as a
   kelangsungan usahanya dan menghadapi tantangan               going concern and face external challenges depends
   eksternal bergantung pada kemampuan Perusahaan               on the Company’s ability to generate sufficient cash
   untuk menghasilkan arus kas yang cukup untuk                 flow to meet its liabilities on a timely basis, as well as
   memenuhi kewajibannya secara tepat waktu, serta              the Company’s ability to have future profitable
   kemampuan Perusahaan untuk memiliki kegiatan                 operations and improve its financial position.
   operasi yang menguntukan di masa depan dan
   memperbaiki posisi keuangannya.

   Laporan keuangan disusun berdasarkan basis                   The financial statements have been prepared on a
   akuntansi      kelangsungan        usaha        yang         going concern basis which assumes that the
   mengasumsikan bahwa Perusahaan akan dapat                    Company will be able to realize its assets and
   merealisasikan asetnya dan melunasi kewajibannya             discharge its liabilities in the normal course of
   dalam kegiatan usaha normal di masa mendatang.               business in the foreseeable future. The going concern
   Asumsi kelangsungan usaha tergantung pada risiko             assumption is subject to risks and uncertainties as
   dan ketidakpastian yang dijelaskan di atas, sehingga         described above, hence there is possibility that
   terdapat kemungkinan bahwa perubahan keadaan                 adverse changes in circumstances may have an
   yang     merugikan    dapat     berdampak       pada         impact on the Company’s going concern. If a change
   kelangsungan usaha Perusahaan. Jika terjadi                  in such circumstances occurs, the Company’s going
   perubahan keadaan tersebut, asumsi kelangsungan              concern assumption may be changed.
   usaha Perusahaan dapat berubah.


45. PENYAJIAN KEMBALI LAPORAN KEUANGAN                       45. RESTATEMENTS OF FINANCIAL STATEMENTS

  Perusahaan melakukan penyajian kembali                        The Company restated the Interim financial
  laporan keuangan Interim untuk periode enam                   statements for the six month periods ended June 30,
  bulan yang berakhir pada tanggal 30 Juni 2022,                2022, based on a letter from OJK Number S-
  berdasarkan surat dari OJK Nomor S-                           480/PM.21/2023 dated March 17, 2023 regarding
                                                                Certain Action Orders to PT Waskita Beton Precast
  480/PM.21/2023 tanggal 17 Maret 2023 perihal                  Tbk, referring to POJK 23/2021, the Company were
  Perintah Tindakan Tertentu kepada PT Waskita                  asked to make corrections to the mispresentation of
  Beton Precast Tbk, merujuk pada POJK                          the MCB post because the MCB post could not meet
  23/2021, Perseroan diminta untuk melakukan                    the criteria for early recognition of financial
  perbaikan atas kesalahan penyajian pos OWK                    instruments based on PSAK 50. Reclassification was
  karena pos OWK belum dapat memenuhi kriteria                  carried out in the June 30 2022 financial statements
  pengakuan     awal     instrumen    keuangan                  and the 2023 LKTT comparison period by making
  berdasarkan PSAK 50. Reklasifikasi dilakukan                  adjustments to the MCB post.
  pada laporan keuangan 30 Juni 2022 dan

                                                       145
Page 149
                                                                                           The original financial statements included herein are in
                                                                                                                         the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                            PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                                    NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                          JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                       30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                          ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                         (UNAUDITED)

  periode pembanding LKTT 2023                dengan
  melakukan penyesuaian pos OWK.

                                                            30 Juni/June 30, 2022
                                                               Penyesuaian
                                       Sebagaimana           Penyajian Kembali/      Sebagaimana
                                        dilaporkan                                     disajikan
                                        sebelumnya                                     kembali/
                                   As previously reported      Restatement            As restated
                                            Rp                      Rp                    Rp
   ASET                                                                                                                                       ASSETS
   ASET LANCAR                                                                                                                     CURRENT ASSETS
   Kas dan Setara Kas                   174.247.058.692                       --     174.247.058.692                        Cash and Cash Equivalents
   Piutang Usaha                                                                                                                  Account Receivables
    Pihak Berelasi                      745.822.974.420                       --     745.822.974.420                                  Related Parties
    Pihak Ketiga                        205.579.466.328                       --     205.579.466.328                                    Third Parties
   Piutang Lain-lain                                                                                                                Other Receivables
    Pihak Berelasi                        5.666.001.800                       --       5.666.001.800                                  Related Parties
    Pihak Ketiga                          3.350.661.482                       --       3.350.661.482                                    Third Parties
   Persediaan                           688.987.034.645                       --     688.987.034.645                                       Inventories
   Tagihan bruto                                                                                                                        Gross amount
    Pihak Berelasi                      460.732.521.403                       --     460.732.521.403                                  Related Parties
    Pihak Ketiga                        117.133.971.685                       --     117.133.971.685                                    Third Parties
   Pajak Dibayar di Muka                 31.441.803.836                       --      31.441.803.836                                   Prepaid Taxes
   Uang Muka kepada Pihak Ketiga            205.362.090                       --         205.362.090                         Advances to Third Parties
   Biaya Dibayar di Muka                20.071.198.049                        --      20.071.198.049                                Prepaid Expenses
   JUMLAH ASET LANCAR                 2.453.238.054.430                       --    2.453.238.054.430                       TOTAL CURRENT ASSETS
   ASET TIDAK LANCAR                                                                                                          NON CURRENT ASSETS
   Aset Tetap                         3.955.311.806.104                       --    3.955.311.806.104                    Property Plant and Equipments
   Aset Hak Guna - Bersih                17.497.981.319                       --       17.497.981.319                                Deferred Tax Asset
   Aset Lain-lain                       88.847.589.138                        --       88.847.589.138                                      Other Assets
                                                                                                     -
   JUMLAH ASET TIDAK LANCAR           4.061.657.376.561                       --     4.061.657.376.561                 TOTAL NON CURRENT ASSETS
                                                                                                     -
   JUMLAH ASET                        6.514.895.430.991                       --     6.514.895.430.991                                 TOTAL ASSETS




                                                            146
Page 150
                                                                                                              The original financial statements included herein are in
                                                                                                                                            the Indonesian language.


        PT WASKITA BETON PRECAST Tbk                                                           PT WASKITA BETON PRECAST Tbk
 CATATAN ATAS LAPORAN KEUANGAN INTERIM                                                   NOTES TO THE INTERIM FINANCIAL STATEMENTS
30 JUNI 2023, 31 DESEMBER 2022 DAN 30 JUNI 2022                                         JUNE 30, 2023 AND DECEMBER 31, 2022 AND JUNE
      SERTA UNTUK PERIODE ENAM BULAN                                                      30, 2022 AND FOR THE SIX-MONTH PERIODS
     YANG BERAKHIR 30 JUNI 2023 DAN 2022                                                         ENDED JUNE 30, 2023 AND 2022
                  (TIDAK DIAUDIT)                                                                        (UNAUDITED)

                                                                           30 Juni/June 30 , 2022
                                                                               Penyesuian
                                                     Sebagaimana            Penyajian Kembali/          Sebagaimana
                                                      dilaporkan                                          disajikan
                                                      sebelumnya                                          kembali/
                                                 As previously reported        Restatement               As restated
                                                          Rp                       Rp                        Rp
   LIABILITAS DAN EKUITAS                                                                                                                           LIABILITIES AND EQUITY
   LIABILITAS                                                                                                                                                    LIABILITIES
   LIABILITAS JANGKA PENDEK                                                                                                                           CURRENT LIABILITIES
   Utang Bank Jangka Pendek                                                                                                                          Short Term Bank Loans
      Pihak Berelasi                                                  --                    --                         --                                   Related Parties
      Pihak Ketiga                                                    --      661.614.800.319            661.614.800.319                                      Third Parties
   Utang Usaha                                                                                                                                             Account Payables
    Pihak Berelasi                                     21.986.055.648           37.729.762.114            59.715.817.762                                    Related Parties
    Pihak Ketiga                                    1.787.165.102.213        1.338.963.674.852         3.126.128.777.065                                      Third Parties
   Utang Lain-lain                                                                                                                                           Other Liabilities
    Pihak Berelasi                                     77.127.711.007                        --          77.127.711.007                                     Related Parties
    Pihak Ketiga                                          611.994.295                        --             611.994.295                                       Third Parties
   Utang Pajak                                         57.336.602.812                        --          57.336.602.812                                        Tax Payables
   Beban Akrual                                       472.743.681.126                        --         472.743.681.126                                  Accrued Expenses
   Uang Muka dari Pelanggan                                                                                                                        Advances from Customers
    Pihak Berelasi                                      55.905.287.677                       --          55.905.287.677                                     Related Parties
    Pihak Ketiga                                        35.130.949.270                       --          35.130.949.270                                       Third Parties
   Liabilitas Jangka Panjang yang Jatuh Tempo                                                                                                              Current Maturity of
    dalam Satu Tahun                                                                                                                                   Long-Term Liabilities
    Utang Obligasi - Bersih                                         --       1.803.776.736.110         1.803.776.736.110                                Bonds Payable - Net
    Liabilitas Sewa                                     5.297.362.269                        --            5.297.362.269                                    Lease Liabilities
   JUMLAH LIABILITAS JANGKA PENDEK                  2.513.304.746.317        3.842.084.973.394         6.355.389.719.711                      TOTAL CURRENT LIABILITIES
   LIABILITAS JANGKA PANJANG                                                                                                                     NON CURRENT LIABILITIES
   Utang Bank Jangka Panjang                                                                                                                         Long Term Bank Loans
      Pihak Berelasi                                  656.859.372.080                        --         656.859.372.080                                    Related Parties
      Pihak Ketiga                                    619.221.059.482                        --         619.221.059.482                                       Third Parties
   Utang Obligasi                                     202.395.166.148                        --         202.395.166.148                                      Bond Liabilities
   Liabilitas Sewa Guna Usaha                           9.800.227.550                        --           9.800.227.550                                     Lease Liabilities
   Liabilitas Imbalan Kerja                           19.908.742.083                         --          19.908.742.083                           Employee Benefit Liabilities
   JUMLAH LIABILITAS JANGKA PANJANG                 1.508.184.567.343                        --        1.508.184.567.343                 TOTAL NON CURRENT LIABILITIES
   JUMLAH LIABILITAS                                4.021.489.313.660        3.842.084.973.394         7.863.574.287.054                             TOTAL LIABILITIES
   EKUITAS                                                                                                                                                             EQUITY
   Modal Saham - Nilai Nominal Rp100 per saham                                                                                      Share Capital - Rp100 par Value per Share
    Modal Dasar - 63.266.778.136 lembar saham                                                                                      Authorized - 63266778136 Shares of Stock
    Modal Ditempatkan dan disetor Penuh                                                                                                                 Issued and Fully Paid
    26.361.157.534 Lembar Saham                     2.636.115.753.400                       --         2.636.115.753.400                           26361157534 Shares as of
   Tambahan Modal Disetor                           3.944.529.408.861                       --         3.944.529.408.861                              Additional Paid In Capital
   Saham Diperoleh Kembali                          (775.953.722.340)                       --          (775.953.722.340)                                       Treasury Stock
   Obligasi wajib Konversi                          3.842.084.973.394      (3.842.084.973.394)                         --                         Mandatory Convertible Bond
   Saldo Laba                                                                                                                                                Retained Earnings
    Telah Ditentukan Penggunaannya                     272.173.444.924                       --          272.173.444.924                                         Appropriated
    Belum Ditentukan Penggunaannya                 (7.707.707.971.123)                       --       (7.707.707.971.123)                                     Unappropriated
   Komponen Ekuitas Lainnya                           282.164.230.215                        --          282.164.230.215                            Other Component of Equity
   JUMLAH EKUITAS                                   2.493.406.117.331      (3.842.084.973.394)        (1.348.678.856.063)                                   TOTAL EQUITY
   JUMLAH LIABILITAS DAN EKUITAS                    6.514.895.430.991                       --          6.514.895.430.991                   TOTAL LIABILITIES AND EQUITY




46. TANGGUNG    JAWAB   MANAJEMEN   DAN                                               46. MANAGEMENT       RESPONSIBILITY    AND
    PERSETUJUAN ATAS LAPORAN KEUANGAN                                                     APPROVAL OF THE FINANCIAL STATEMENTS

   Penyusunan dan penyajian wajar laporan keuangan                                               The preparation and fair presentation of the financial
   dari halaman 1 sampai 147 merupakan tanggung                                                  statements on pages 1 to 147 were the
   jawab manajemen, dan telah disetujui oleh Direktur                                            responsibilities of the management, and were
   untuk diterbitkan pada tanggal 18 Agustus 2023.                                               approved by the Directors and authorized for issue on
                                                                                                 August 18, 2023.




                                                                           147

File

File Open PDF
Source IDX
Size2.54 MB
Published18 Aug 2023
Pages150
Characters1,126,187
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 0 people and organisations named in the text · linked when the evidence is strong

The name pass has not read this document yet.

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

Other files in this announcement 5

inlineXBRL.zip done
FinancialStatement-2023-II-WSBP.xlsx done
↑↓ select ↵ open ⇧↵ see every result