PT Bumi Resources Minerals Tbk.
Paparan Publik Tahunan
24 Agustus 2023
SG000UM7_AP_0810
Page 2
Struktur Perusahaan BRM
PT Bumi Resources Minerals Tbk,
99,90%
PT Multi Capital
96,97% 100% 98,04 % 49%
1,96 %
PT Citra Palu Minerals International Minerals PT Bumi Sumberdaya PT Dairi Prima Mineral
(Gold) Company LLC Semesta (Zinc & Lead)
80%
78% 60,86%
SGQ Singapore
PT Gorontalo Minerals PT Andalan Anugerah
Projects Holding
(Copper & Gold) Company Pte, Ltd Sekarbumi
90% 99,67%
PT Suma Heksa Sinergi PT Linge Mineral
”Kerta Project” Resources
(Gold) (Gold)
Notes:
▪ PT Aneka Tambang Tbk (ANTM) memiliki 20% saham di PT Gorontalo Minerals.
▪ China Nonferrous Metal Industry’s Foreign Engineering & Construction Co Ltd. (NFC China) memiliki 51% saham di PT Dairi Prima Mineral.
SG000UM7_AP_0810
Page 3
Asset Portfolio
Linge Mineral Resources Gorontalo Minerals
Stake: 60,66%. Stake: 80%
Type: Gold. Type: Copper & Gold.
Reserve (100%): 2.3 mio ton ore. Reserve (100%): 105.4 mio ton (Sungai Mak).
Grade: 1.8 g/ton Au. Grade: 0.7% Cu, 0.33 g/ton Au.
Resource (100%): 6.8 mio ton ore. Resource (100%) : 392.3 mio ton (Sungai Mak & Cabang
Grade: 1.58 g/ton Au. Kiri, Motomboto North, Motomboto East & Kayubulan)
Medan Grade: 0.49% Cu, 0.43 g/ton Au.
Celebes Sea
Duri
Kalimantan
Molucca Sea
INDONESIA
Java
Sea Citra Palu Minerals
Stake: 96.97%
Banda Sea Type: Gold.
Indian JAKARTA
Reserves (100%): 22.8 mio ton ore (Poboya).
Ocean
Grade: 2.4 g/ton Au.
Dairi Prima Mineral Sumbawa
Timor Sea
Resource (100%): 28.4 mio ton ore (Poboya).
Grade: 2.4 g/ton Au.
Stake: 49%.
Type: Zinc & lead
Reserve (100%): 11 mio ton ore (Anjing Hitam & Lae Jahe). Suma Heksa Sinergi
Grade: 11.5% Zn, 6.8% Pb.
Resource (100%): 25 mio ton ore (Anjing Hitam, Lae Jahe, Stake: 70%.
Base Camp). Type: Gold.
Grade: 10.1% Zn, 6.0% Pb. Reserve (100%): 18.4 mio ton ore.
Grade: 1.07 g/ton Au.
Resource (100%): 75.3 mio ton ore.
Source: BRM.
Grade: 0.85 g/ton Au.
SG000UM7_AP_0810
2
Page 4
Tim Manajemen BRM
Agoes Projosasmito Suseno Kramadibrata Adrian Wicaksono
• Berpengalaman lebih dari 31 tahun di pasar
modal dan menjabat sebagai Direktur Utama • Berpengalaman lebih dari 38 tahun • Pendiri dari PT Tri Karya
di Danareksa Securities, Wakil Direktur dalam operasi penambangan dan Teslatama ( Distributor aksesoris
Utama di DBS Securities, Direktur di
Merincorp Securities.
manajemen dari Bukit Asam, Rio kelistrikan untuk saluran
Tinto, Kaltim Prima Coal, transmisi & gardu induk
• Berpengalam lebih dari 15 tahun di industry
Pertambangan yang mana saat ini menjabat • VP Asia di International Society for tegangan tinggi ).
sebagai Komisaris Utama di Amman
Mineral International, wakil Direktur di
Rock Mechanics & Rock
Engineering (ISRM). • Berpengalaman 5 tahun di pasar
Amman Mineral Nusa Tenggara, Direktur
Utama di Ithaca Resources dan sebagai
modal sebagai Analyst di sektor
Direktur Wakil
Komisaris Utama di Maduma Coal Energy. • Presiden di Indonesian Rock Direktur Perbankan, minyak saw it and
Utama Direktur Utama
• Anggota Dewan Ekonomi – Komite Standar Mechanics Society (IRMS) mineral batubara di PT Nusantara
Prof esi Pasar Modal. asosiasi dengan ISRM. Capital Sekuritas
Herwin Wahyu Hidayat Muhammad Sulthon Fuad Helmy
• Berpengalaman lebih dari 18 tahun • Berpengalaman lebih dari 17 tahun • Berpengalaman lebih dari 15 tahun
di bidang keuangan dan Investor sebagai Head of Legal Counsel sebagai Bisnis Analis dan Chief
Relations dalam industri minyak & dan Corporate Secretary di sektor Finance Officer di industri
gas dan pertambangan. industri pertambangan. pertambangan.
• Pernah bekerja lebih dari 6 tahun • Pernah bekerja sebagai Senior • Berpengalaman lebih dari 7 tahun
sebagai Corporate Bankers di ABN Legal Officer di PT Arutmin dalam konsultasi keuangan dan
Amro dan Citibank. Indonesia selama 5 tahun. sektor perbankan dari Bank
Danamon dan BC Nusantara.
Direktur Direktur Direktur
Adhika Andrayudha Bakrie Adika Aryasthana Bakrie
• Berpengalama n lebih dari 8 tahun di • Berpengalaman sebagai Assistant
industry miny ak sawit sebagai Direktur Investment Analyst di Alta Verde
di Bakrie Sumatra Plantations. Group (California, USA) pada
tahun 2010.
• Pernah bekerja lebih dari 7 tahun di
industry batubara sebagai Direktur di • Pernah bekerja sebegai Chief
Arutmin Indonesia.
Executive of Service & Support
• Memiliki pengalaman 5 tahun (2015 –
Division di bisnis Perkebunan
2020) sebagai Direktur di Kaltim Prima Kelapa Saw it di tahun 2016.
Direktur Direktur
Coal.
SG000UM7_AP_0810
3
Page 5
Operation Team
Damar Kusumanto Yan Adriansyah Agus Sitindaon
• Berpengalaman lebih dari 16 • Berpengalama n lebih dari 26 tahun
▪ Berpengalaman lebih dari 25 tahun sebagai metallurgy di industri mineral
sebagai Senior Ahli Geologi dan tahun sebagai teknik geotechnical processing baik keahlian teknis
pimpinan proyek eksplorasi dari & hydrogeological di berbagai maupun pengalaman operasional.
pekerjaanya di Aneka Tambang , perusahaan tambang terbuka.
Austindo Resources, Mine Serve • Berpengalama n dalam peny elesaian &
International (Freeport Grup). pengoperasian semua peralatan terkait
• Pernah bekerja di : Arutmin pabrik pengolahan mineral.
Indonesia, Adaro Indonesia,
▪ Competent Person di Indonesia Kaltim Prima Coal, Amman
Direktur Utama Direktur • Pernah bekerj a di : Freepo rt Indonesia,
untuk melaporkan hasil eksplorasi Direktur
PT Citra Palu Minerals Mineral Nusa Tenggara, dan PT Citra Palu Minerals Berkat Maju Teknik, Wilson Walton
(mineral emas dan pengikutnya). PT Citra Palu Minerals
(Gold project) Berau Coal. (Gold project) Indonesia, dan Central Trust Indonesia.
(Gold project)
Charles Daniel Gobel Hary Irmawan Mizal Ardhian
• Berpengalaman lebih dari 11 tahun • Berpengalaman lebih dari 21 tahun
di sector pertambangan. Pernah sebagai Teknik pertambangan yang • Berpengalaman lebih dari 16 tahun
bekerja di: Amman Mineral Group, berfokus pada projek tembaga, sebagai Teknik Pertambangan yang
PT Bormindo Nusantara, PT emas, perak dan batubara. berfokus pada proyek emas,
Ancora Indonesia Resources Tbk. tembaga, bijih besi dan batubara.
• Pernah bekerja di : Archi Indonesia,
• Berpengalaman lebih dari 10 tahun • Pernah bekerja di : Pinang Coal
Sarawak Energy Berhad (Malaysia), Indonesia (Noble Energy group),
di Industri Pasar Modal. Pernah Discovery Metals Limited
bekerja di: PT Danasakti securities Danmar Explorido Consultant, Ratu
Direktur Chief Operating Officer (Bostwana), Newmont Nusa Manager Samban Mining, dan Tamagot BUMI
Indonesia, Latham Capital Partners Tenggara, dan PT Vietmindo Mine Engineering
PT Citra Palu Minerals PT Gorontalo Minerals SA, (Mauritania ,Afrika).
Ltd. Arapima Fund L.P., (Singapur), (Copper & Gold Project) Energitama (Vietnam).
(Gold Project) PT Gorontalo Minerals
(Copper & Gold Project)
Indra Yogasurya Rimayansyah Ali Rahman Haris Yusuf
• Berpengalaman lebih dar i 14 • Berpengalaman lebih dari 17 ▪ Berpengalaman lebih dari 30 tahun
tahun sebagai mining Engineer di Industri Pertambangan, termasuk
tahun sebagai ahli Geologi di
yang berfokus pada Emas, pertambangan baw ah tanah,
proyek tembagan dan emas di
Tembaga, Bauxite, Timah, kosntruksi sipil dan penyelesaian
Gorontalo, Sulaw esi.
Nickel and Batubara. pabrik.
• Berpengalaman 3 tahun sebagai • Pernah bekerja di : Harita Prima ▪ Pernah bekerja di : Aneka
ahli Geologi di pr oyek bijih bes i di Abadi Mineral, Trinergy Mandiri
Manager Tambang, Austindo Resources,
Geology & Development Mauritania & Madagscar (Afrika). Direktur International, dan Sitrade Direktur
PT Gorontalo Minerals PT Suma Heksa Sinergi PT Linge Mineral Gamma Epsilon.
(Copper & Gold Project) (Gold Project - Kerta) Nusaglobus. Resources
(Gold Project))
SG000UM7_AP_0810
4
Page 6
Citra Palu Minerals (CPM)
Proyek Emas
◼ Memiliki hak konsesi pertambangan seluas 85.180
hektar di Sulawesi Tengah dan Sulawesi Selatan.
◼ Izin konstruksi dan produksi telah disetujui oleh
Pemerintah Indonesia pada November 2017 dengan
periode konstruksi 3 tahun dan periode produksi 30
tahun (hingga tahun 2050).
◼ Pabrik pengolahan bijih emas pertama (500 ton /hari)
sudah beroperasi sejak Q1 2020.
◼ Menyelesaikan pembangunan pabrik emas CIL ke 2
(4.000 ton per hari) pada Kuartal IV 2022 (pabrik
selesai pada bulan November 2022).
◼ Rencana untuk menyelesaikan pembangunan pabrik
emas ke-3 di tahun 2024 (Prospektus PUT- 1 tanggal
18 Maret 2021).
Produksi Emas BRMS
FY 2020 FY 2021 FY 2022 1H 2023
73 Kg 139 Kg 174 Kg 236 Kg
Produksi Emas
2,271 oz 4,328 oz 5,415 oz 7,611 oz
* Nilai-nilai dalam tabel ini telah dilaporkan ke angka penting y ang sesuai; karena itu; mungkin ada perbedaan
• The KCMI standard Resource was completed by a Competent Person - Ndaru Cahyono dalam nilai total.
(CPI-154) In 2022.
• The KCMI standard Reserve was completed by a Consultant Competent Person - Join
Damanik (PERHAPI CP.130.12.2016) In 2022.
Source: BRM.
SG000UM7_AP_0810
5
Page 7
Citra Palu Minerals
Area Konsesi
Kontrak Karya Blok 1 Poboya
Block IV Block V
Anggasan Moutong
Block VI
Roto
Block I
Poboya
Block II
Winehi
SG000UM7_AP_0810
6
Page 8
Citra Palu Minerals
Alur Proses Pengolahan Bijih Emas
Gold Processing Flowsheet
SG000UM7_AP_0810
7
Page 9
Citra Palu Minerals
Pabrik Pengolahan Bijih Emas 500 ton /hari
Plant
Jaw Area
Crusher Sag Mill & Ball Mill
1 2
Cyclone Thickener
3 4
SG000UM7_AP_0810
Source: Citra Palu Minerals 8
Page 10
Citra Palu Minerals
Pabrik Pengolahan Bijih Emas 500 ton /hari
Carbon
Plant
in Leach
Area Tank Elution & Electrowinning
5 6
Furnace Dore Bullion
77 8
SG000UM7_AP_0810
Source: Citra Palu Minerals 9
Page 11
Citra Palu Minerals
Pabrik Pengelolaan Bijih Emas 4.000 ton per hari
SG000UM7_AP_0810
Source: Citra Palu Minerals 10
Page 12
Citra Palu Minerals
Area Pabrik Pengolahan bijih emas 1 & 2 di Blok-1 (Poboya, Palu)
SG000UM7_AP_0810
11
Page 13
Citra Palu Minerals
Lokasi Pabrik Pengolahan Bijih Emas 500 ton /hari dan fasilitas baru
1. Plant 500 tpd
2. Basecam p
SG000UM7_AP_0810
Source: Citra Palu Minerals
12
Page 14
Citra Palu Minerals
Aktivitas Pemboran dan Coreshed
Aktivitas Pemboran Aktiivitas di Coreshed
SG000UM7_AP_0810
Source: Citra Palu Minerals
13
Page 15
Gorontalo Minerals (GM)
Proyek Tembaga dan Emas
Metal Grade Metal Contet
Range Million Tones
Ore Type Cu Au Ag Cu Au Ag Class
%Cu (Mt)
◼ Memiliki hak konsesi Kontrak Karya untuk (%) g/t g/t (kton) (koz) (koz)
pertambangan seluas 24.995 hektar yang terletak di Low Grade 0.2-0.45 37 0.32 0.17 1.02 93 121 871
kabupaten Bone Bolango, Provinsi Gorontalo. Medium Grade 0.45-0.08 37.4 0.61 0.31 1.57 183 239 1,426
Probable
High Grade > 0.80 31 1.27 0.54 2.39 337 399 1,986
TOTAL RESERVES 105.4 0.7 0.33 1.62 613 759 4,283
◼ Studi Kelayakan pada proyek Sungai Mak telah disetujui
oleh Pemerintah Indonesia pada tahun 2014 dengan Site CoG
Million Tones
Cu (%) Au (g/t) Ag (g/t)
(Mt)
cadangan bijih 105 Mt @ 0.70% Cu dan 0.33 g/t Au
Sungai Mak 0.2 g/t Au & 0.2 % Cu 165.1 0.55 0.30 1.49
berdasarkan KCMI & JORC.
Cabang Kiri 0.2 g/t Au & 0.2 % Cu 151.0 0.40 0.55 -
Motomboto North 0.5 g/t Au 4.0 1.04 2.57 55.12
◼ Perkiraan sumber daya 392,3 Mt bijih @ 0,49% Cu dan Motomboto East 0.5 g/t Au 6.1 0.33 1.12 29.92
0,43 g/t Au dari Sungai Mak, Cabang Kiri, Motomboto Kayubulan 0.3 % Cu 66.2 0.52 0.29 -
Timur, Motomboto Utara & Kayubulan berdasarkan Total Resources (SMak, Cbg Kiri, Kybulan, MBN & MBE) 392.3 0.49 0.43 1.60
KCMI.
Location
◼ Izin Konstruksi dan Produksi disetujui oleh Pemerintah
pada Februari 2019 dengan periode konstruksi 3 tahun
dan periode produksi 30 tahun (hingga tahun 2052).
◼ Rencana untuk mengembangkan prospek emas
termasuk aktivitas pemboran dan konstruksi
infrastruktur.
• The JORC, KCMI standard Reserve was completed by Independent consultant - Iwan
Munajat (CPI-019; AusIMM 306293) in 2014.
• The KCMI standard Resource was completed by The Competent Person – Heru Pratomo
(CPI-027) & Dedy Hendrawan (CPI–018) in 2013.
Source: BRM.
SG000UM7_AP_0810
14
Page 16
Gorontalo Minerals
Lokasi & Prospek
SG000UM7_AP_0810
15
Page 17
Gorontalo Minerals
Infrastruktur & Aktivitas Pemboran
Area Kantor Aktivitas Pemboran di Motomboto (Proyek Emas)
Core Shed Base Camp di Cabang Kiri (Proyek Tembaga)
SG000UM7_AP_0810
Source: Gorontalo Minerals
16
Page 18
Gorontalo Minerals
Aktivitas & Progres Pengembangan Infrastruktur
Pioneering road at Segment 1
(Sta 5+400) Infrastructure Plan
Pioneering road construction at Pioneering road construction at
Segm ent 2, Cabang Kiri Segm ent 2, Cabang Kiri
SG000UM7_AP_0810
Source: Gorontalo Minerals
17
Page 19
Suma Heksa Sinergi (SHS) – Kerta Project
Proyek Emas
Kerta - Reserves / Cadangan*
Overview
Tonnage Grade Metal Content
Prospect Classification
◼ Proyek Kerta memiliki Izin Usaha (Mton) Au (g/t) Ag (g/t) Au (oz) Ag (oz)
Pertambangan (“IUP”) untuk konsesi tambang Cisadang Central Probable 11.8 1.07 14.76 406,800 5,611,800
seluas 7.291 hektar yang berlokasi di Lebak, Cisadang West Probable 6.6 1.07 14.72 227,500 3,130,500
Banten. Total Reserves 18.4 1.07 14.75 634,300 8,742,300
Kerta - Resources / Sumberdaya*
◼ Izin Lingkungan sudah disetujui oleh
Tonnage Grade Metal Content
Pemerintah pada bulan Mei 2019. Prospect Classification
(Mton) Au (g/t) Ag (g/t) Au (oz) Ag (oz)
Indicated 14.5 1.01 14.05 469,000 6,549,600
◼ Studi Kelayakan di Proyek Kerta sudah Cisadang Central
Inferred 6.5 0.97 13.13 201,700 2,743,700
(Upper Domain)
disetujui oleh Pemerintah pada bulan Juni 2019. Sub Total 21.0 1.00 13.77 670,700 9,293,300
Indicated 3.0 1.01 11.36 96,800 1,095,600
Cisadang Central
◼ Izin Operasi Produksi disetujui oleh Pemerintah (Lower Domain)
Inferred 20.0 0.76 8.77 488,500 5,639,000
pada bulan November 2019 dengan periode Sub Total 23.0 0.79 9.11 585,300 6,734,600
Indicated 11.9 0.93 13.81 359,900 5,283,400
produksi 20 tahun (sampai 2039). Cisadang
Inferred 19.4 0.71 10.92 440,900 6,810,700
West
Sub Total 31.3 0.79 12.02 800,800 12,094,100
◼ Sumberdaya mineral dan Cadangan bijih sudah Total Indicated 29.1 0.98 13.68 925,700 12,928,600
memenuhi standar KCMI 2016. Total Inferred 45.9 0.77 10.30 1,131,100 15,193,400
Total Resources 75.3 0.85 11.62 2,056,800 28,122,000
• The K CMI standard Resou rces was completed by Co mpetent Person – Ron ald Sibara ni
(PERHAPI 9100137,012) in 2016,
• The K CMI standard Reserve was co mpl eted by Co mpetent Person – Iwan Munajat ( CPI019,
AusIMM:306293) in 2016,
• The values in this table have been reported to ap propriate significant figures; therefore, there
may be discrepancies in the totaled values
SG000UM7_AP_0810
18
Page 20
Suma Heksa Sinergi (SHS) – Proyek Kerta
Gold Mine Project
SG000UM7_AP_0810
19
Page 21
Linge Mineral Resources (LMR)
Proyek Emas
Linge Abong Gold Project - RESERVE
Overview
Tonnage Grade Metal Content
Clarification
(million)
◼ Linge Mineral Resouces memiliki Izin Au (g/t) Ag (g/t) Au (Oz) Ag (Oz)
Proven 0.66 1.88 7.40 35.782 141.000
Usaha Pertambangan (“IUP”) untuk Probable 1.66 1.76 6.98 84.841 335.908
Total Reserve 2.32 1.80 7.10 120.624 476.908
konsesi tambang seluas 36.420 hektar
Linge Abong Gold Project - RESOURCE
yang berlokasi di Linge, Aceh. Tonnage Grade Metal Content
Prospect Classification
(Million) Au (g/t) Ag (g/t) Au (Oz) Ag (Oz)
◼ Projek pengembangan meliputi: Inferred 2.39 1.54 6.77 118,785 521,136
Bul an Indicated 2.09 1.8 6.77 120,855 455,676
Aktivitas pengeboran, survei Mea s ured 0.73 1.95 7.48 45,603 175,179
Inferred 0.48 1.2 8.3 18,408 127,376
elektromagnetik, tes metalurgi, Bi ntang 1 Indicated 0.29 1.32 8.97 12,208 82,935
Mea s ured 0.1 1.36 8.7 4,268 27,231
pekerjaan desain tambang, dan
Inferred 0.65 1.06 6.94 22,142 145,531
persetujuan studi kelayakan. Bi ntang 2 Indicated 0.07 1.24 4.94 2,684 10,658
Mea s ured 0.01 0.92 2.91 153 484
Total Resource 6.8 1.58 7.07 345,107 1,154,207
◼ Saat ini dalam proses untuk R
Location
mendapatkan persetujuan Pemerintah
untuk Analisa Mengenai Dampak
Lingkungan (AMDAL) dan izin
Produksi (20 tahun).
PT LMR
- The JORC and KCMI/ SNI standars Reserve and Resource was
complete by PT Mamberamo Mineral Service (PT MMS) in 2019.
SG000UM7_AP_0810
20
Sumber : Linge Mineral Resources
Page 22
Linge Mineral Resources
Konstruksi – Tata Letak Infrastruktur
Lokasi Infrastruktur
SG000UM7_AP_0810
21
Page 23
Linge Mineral Resources
Eksplorasi – Kegiatan pengambilan sampel dan fasilitas Coresheed
Density Analysis Core Management
Base camp Ore Sample Testing
SG000UM7_AP_0810
22
Page 24
Linge Mineral Resources
Eksplorasi – Drilling Campaign
Rig Movement Reverse Circulation Drilling
Diamond Drilling Sampel Core
SG000UM7_AP_0810
Source: Linge Mineral Resources
23
Page 25
Dairi Prima Mineral (DPM)
Proyek Seng dan Timah Hitam
Sites Combined Reserves
◼ Dairi merupakan tambang seng dengan kualitas yang
Proven 4.95 Mt at 14.8% Zn, 9.1% Pb
tinggi yang terletak di Sumatera Utara dan akan Anjing Hitam
dikembangkan dengan operasi penambangan bawah Probable 0.90 Mt at 11.3% Zn, 7.0% Pb
tanah (konsesi tambang seluas 24.636 Ha).
Lae Jahe Probable 5.20 Mt at 8.4% Zn, 4.5% Pb
◼ Studi Kelayakan Proyek Anjing Hitam telah disetujui TOTAL RESERVES 11.05 Mt at 11.5% Zn, 6.8% Pb
pada tahun 2015.
Sites Combined Minerals Resources
◼ Izin Produksi telah disetujui oleh Pemerintah pada
Desember 2017 dengan periode produksi selama 30 Anjing Hitam 8.10 Mt at 14.6% Zn, 9.1% Pb
tahun (sampai tahun 2047).
Lae Jahe 16.20 Mt at 8.2% Zn, 4.5% Pb
◼ Total Cadangan 11 Mt bijih berdasarkan JORC Base Camp 0.80 Mt at 5.0% Zn, 5.0% Pb
dengan Umur Tambang 15 tahun. Total Sumber Daya TOTAL RESOURCE 25.10 Mt at 10.1% Zn, 6.0% Pb
25 Mt bijih berdasarkan JORC.
◼ Tingkat deposit seng terbaik ketiga di Dunia (Grade
11,5% Zn, 6,8% Pb).
◼ Saat ini dalam masa konstruksi fasilitas infrastruktur
dan finalisasi pendanaan untuk kegiatan
penambangan di lokasi tambang Anjing Hitam.
• Standarisasi sumberdaya dan cadangan JORC telah diselesaikan oleh CSA Global
(Australia) pada Okt 2010 dan Mining Plus Pty. Ltd pada Feb 2011
SG000UM7_AP_0810
24
Page 26
Dairi Prima Mineral (Lokasi & Prospek)
SG000UM7_AP_0810
25
Page 27
Dairi Prima Mineral
Konstruksi Portal Penambangan Bawah Tanah
Konstruksi Portal Penambangan Bawah Tanah
1 2
3 4
SG000UM7_AP_0810
26
Page 28
Dairi Prima Mineral
Konstruksi Portal Penambangan Bawah Tanah
Konstruksi Portal Penambangan Bawah Tanah
SG000UM7_AP_0810
27
Page 29
Dairi Prima Mineral
Floatation Tanks, Power Generator & Batching Plant
Floatation Tanks, Generator & Batching Plant
Floatation Tanks
Generator
Batching Plant
SG000UM7_AP_0810
28
Page 30
Dairi Prima Mineral
Unit Operasi - Pembangunan
Unit Operasi - Pembangunan
Warehouse
Temporary Camp Sidiangkat office
SG000UM7_AP_0810
29
Page 31
Dairi Prima Mineral
Peralatan Tambang Bawah Tanah
Peralatan Tambang Bawah Tanah
Mobile Crane
Trucks, LHD, Jumbo Drill,
SG000UM7_AP_0810
30
Page 32
KINERJA KEUANGAN & PRODUKSI
SG000UM7_AP_0810
31
Page 33
SG000UM7_AP_0810
Terima Kasih
32
Names mentioned 0 people and organisations named in the text · linked when the evidence is strong
The name pass has not read this document yet.
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
No extraction attempted yet.