Skip to content
Back to announcement

LK Konsolidasian Interim 30 Juni 2023 WSKT.pdf

Financial statement Text extracted WSKT

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 233

Page 1
PT WASKITA KARYA (PERSERO) TBK              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                       AND ITS SUBSIDIARIES


LAPORAN KEUANGAN KONSOLIDASIAN INTERIM      INTERIM CONSOLIDATED FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2023 DAN 31 DESEMBER 2022       AS OF JUNE 30, 2023 AND DECEMBER 31, 2022
DAN UNTUK PERIODE-PERIODE ENAM BULAN                    AND FOR THE SIX MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2023 DAN 2022                          ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT)                                                          (2022 – AUDITED)
Page 2
PT WASKITA KARYA (PERSERO) TBK                                 PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                           AND ITS SUBSIDIARIES
LAPORAN KEUANGAN KONSOLIDASIAN INTERIM               INTERIM CONSOLIDATED FINANCIAL STATEMENTS
TANGGAL 30 JUNI 2023 DAN 31 DESEMBER 2022                      AS OF JUNE 30, 2023 AND DECEMBER 31, 2022
DAN UNTUK PERIODE-PERIODE ENAM BULAN                                   AND FOR THE SIX MONTHS PERIODS
YANG BERAKHIR 30 JUNI 2023 DAN 2022                                        ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT)                                                                         (2022 – AUDITED)




  Daftar Isi                                        Halaman/                                      Table of Contents
                                                     Pages


  Surat Pernyataan Direksi                                                                Directors’ Statement Letter

  Laporan Posisi Keuangan Konsolidasian Interim        1        Interim Consolidated Statements of Financial Position

  Laporan Laba Rugi dan Penghasilan Komprehensif       3            Interim Consolidated Statements of Profit or Loss
  Lain Konsolidasian Interim                                                      and Other Comprehensive Income

  Laporan Perubahan Ekuitas Konsolidasian Interim      4              Interim Consolidated Statements of Changes in
                                                                                                             Equity

  Laporan Arus Kas Konsolidasian Interim               5             Interim Consolidated Statements of Cash Flows

  Catatan atas Laporan Keuangan Konsolidasian          6                  Notes to the Interim Consolidated Financial
  Interim                                                                                                 Statements
Page 3
dtl PT. WASKITA KARYA
wASxxTA INDUSTRI KONSTRUKSI
                                                                               (Persero) Tbk
                                                                                                                                KANTOR PUSAT

G€duns waskita. Jr M T Haryono Kav No 10. cawans'Jakatu   l334t,Jfijrljtjtjl]ljEo 8520. Faks (021) 850 8506. waskita@waskira co d. www waskrta.co id

                                             TENTANG
                   TANGGUNG JAWAB ATAS LAPORAN KEUANGAN INTERIM KONSOLIDASIAII
                       UNTUK PERIODE.PERIODE ENAM BULAN YANG BERAKHIR PADA
                           TANGGAL 30.JU!!2!?3 qDAK DIAUD|T)DAN 2022 (D|AUDIT)
                        DAN TAHUN.TAHUN YANG BERAKHTR 31 DESEMBER 2d22 (DlAdDlT)
                             pT WASKTTA IGRyA (percero)
                                                        Tbk dan ENTTTAS ANAK
                                        BOARD OF ARECTOR'S SIAIET'E,VT LETIER
                                           REI,,.TINGfO
               fHE RESPONSIBIUrY ON THE INTERIU CONSOUDATED HNANCIALSIATEME'',IS
                                          FOR THE SIX'TONTH PERIODS ENDED
                                      JUNF30,2023 (UNAUDTTED) AND 2022 (AUD|TED)
                             AND FOR THE YE-,/.RS ENDED DECEiIBER 31, 2022 (AUD|TED)
                                PT WASKTA leRyA (percero) Ibk and SUBSIDIARIES
 Kami yang berhnda hngan dibawah ini/ We,             tn undeaignd:
                  Nama/I\/ame                                                 Munsld
                  Alamat kantor/Ofl?ce Address                                Jl. MT Haryono Kav. No. 10 Cawang Jakarta 133140
                  Alamat domisili sesuai KTP/                                 Jl. Ouren lll/5, RT 014/008, Rawamangun, puto Gadung,
                  Domicib w stated in lD Card                                 Jakarta Timur
                  Nomor Telepon/Pho ne Number                                 021- 8508510
                  Jabatan/Posifion                                            Direktur Utama/ Prcsident Direc{or

             2. Nama/ /Vame                                                   Wwi Suprihatno
                  Alamat kantor/Ofibe Address                                Jl. MT Haryono Kav. No. 10 Cawang Jakarta 13340
                  Alamat domisili sesuai lfiP/                               Jl. Pangrango V Blok 9 N0.10, RT 002018, Kayuringin
                  Dunicile as stated in lD Cad                               Jaya, Bekasi &latan, Jawa Barat
                  Nomor Telepon/ Ph @e Numhr                                 021- 8508510
                  Jabatan/Posrtion                                           Dircktur Keuangan dan lvlanajemen Risikoi
                                                                             Arcdu ot Finane and Risk Mmagment
    Menyatakan bahwa :                                                         state lhal:
    1. Kami bertanggung jawab atas penyusunan dan                              1. We are responsib/e fot he prepantion atd
         penyaiian laporan keuangan konsolidasian;                                  presentdion of the wrsolidated finncial statements;
    2. Laponan keuangan interim konsolidasian telah                            2. The interim consolidated finmcid statements have
         disusun dan disajikan sesuai dengan Standar                              been prepared ild presented in onfomity wilh
         Akuntansi Keuangan di lndonesia;                                           the lndonesian Financial Aa:,ounting Stmdards;
   3.    a. Semua informasidalam laporan keuangan interim                      3. a. Hl infornation in the interim consdidatd ftnanciat
            konsolidasian blah dimuat secara lengkap dan                               slafements haye been disclosed in a wnptete and
           bena[                                                                       truhfulmmner;
         b. Laporan keuangan interim konsolidasian tidak                           b. The interim ansdidded financiat statenents do
          mengandung informasi atau hkta material yang                                not M ain any mMeding mdeid intomatim or
          tidak benar, dan tidak menghilangkan informasi                              fxts, aN do not onit matetial infomation or
          atau faKa material; dan                                                     fnts; and
   4.   Kami bertanggung iawab atas sistem pengendalian                       4. We are rcsputsible fot intemal @ntrcl system within
        intem dalam Perseroan dan Entitas Anak.                                     frte Company and its subsidrbnes.
        Demikian pemyataan ini dibud dengan sebenamya.                              This statenent letter b made truthfutty.
                                                Jakarta, 31 Juti2023l luly31, 2023
                                    Direktur Utama/                             Direktur Keuangan dan Manajemen Risiko/
                                  President Director                            Dircdot ol Finan@                md Risk Managment

                                                                   ,.)             €
                                             Murcyid                                      Wiwi Suprihatno
                                                                  -? .rq                                                717.7 rl
Page 4
                                                                                        The original consolidated financial statements included herein are in
                                                                                                                                   the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                                PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                                               AND ITS SUBSIDIARIES
LAPORAN POSISI KEUANGAN                                                                  INTERIM CONSOLIDATED STATEMENTS OF
KONSOLIDASIAN INTERIM                                                                                             FINANCIAL POSITION
Tanggal 30 Juni 2023 dan 31 Desember 2022                                                         As of June 30, 2023 and December 31, 2022
(2022 – Diaudit)                                                                                                            (2022 – Audited)
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                                          (Expressed in full Rupiah amount, unless otherwise stated)

                                                               30 Juni/                  31 Desember/
                                               Catatan/     June 30, 2023             December 31, 2022*)
                                                Notes            Rp                           Rp


ASET                                                                                                                                                             ASSETS
ASET LANCAR                                                                                                                                           CURRENT ASSETS
Kas dan Setara Kas                              3, 54             1.724.079.213.820        2.221.541.281.141                                  Cash and Cash Equivalents
Kas yang Dibatasi Penggunaannya                 3, 54             4.941.020.399.324        6.852.531.796.345                                              Restricted Cash
Investasi Jangka-Pendek                           4                   8.448.200.000            8.448.200.000                                      Short-Term Investments
Piutang Usaha - Bersih                                                                                                                         Accounts Receivable - Net
   Pihak Berelasi                               5, 54             1.665.237.750.198        1.416.358.282.935                                            Related Parties
   Pihak Ketiga                                   5                 488.602.135.296          450.935.922.784                                               Third Parties
Piutang Retensi - Bersih                                                                                                                      Retention Receivables - Net
   Pihak Berelasi                               7, 54             1.285.912.597.974        1.257.150.648.923                                            Related Parties
   Pihak Ketiga                                   7                 249.699.023.954          206.601.822.823                                               Third Parties
Piutang Lain-lain lancar - Bersih                                                                                                         Other Current Receivables - Net
   Pihak Berelasi                               8, 54               832.514.488.027        6.851.200.149.571                                            Related Parties
   Pihak Ketiga                                   8                 320.391.848.839          315.450.751.904                                               Third Parties
Piutang Ventura Bersama                         6, 54               238.610.627.020          248.477.981.675                                    Joint Ventures Receivable
Persediaan - Bersih                               9               4.098.020.420.562        4.283.460.177.987                                             Inventories - Net
Tagihan Bruto Kepada Pengguna Jasa - Bersih                                                                                   Gross Amounts Due From Customers - Net
    Pihak Berelasi                              10, 54            4.116.681.255.068        6.334.181.533.279                                            Related Parties
    Pihak Ketiga                                  10              1.860.170.234.614        1.543.483.209.458                                               Third Parties
Aset Keuangan Atas Proyek Konsesi                                                                                              Financial Asset From Concession Project -
   Bagian Lancar                                 21                  26.597.797.052           25.000.237.835                                            Current Portion
Pajak Dibayar Dimuka                             11a              1.133.211.960.159          584.026.841.825                                               Prepaid Taxes
Uang Muka dan Biaya Dibayar Dimuka               12               1.176.215.752.573          831.394.085.964                                 Advances and Prepayments
TOTAL ASET LANCAR                                                24.165.413.704.480       33.430.242.924.449                                TOTAL CURRENT ASSETS

ASET TIDAK LANCAR                                                                                                                               NON-CURRENT ASSETS
Investasi Pada Entitas Asosiasi dan                                                                                                         Investment in Associates and
   Ventura Bersama                               13               2.356.024.634.316        2.608.505.681.094                                             Joint Ventures
Piutang Lain-lain Tidak Lancar - Bersih                                                                                             Other Non-Current Receivables - Net
   Pihak Berelasi                               8, 54             8.243.687.329.934        1.937.590.465.399                                            Related Parties
Properti Investasi                               14                 317.540.434.513          317.540.434.513                                        Investment Properties
Investasi Jangka Panjang Lainnya                 15                 869.738.189.820          869.738.189.820                               Other Long-Term Investments
Aset Tetap - Bersih                              16               5.845.564.187.012        6.137.155.474.852                                           Fixed Assets - Net
Aset Hak Guna - Bersih                           17                  27.712.828.407           39.630.661.357                                    Right-of-Use Assets - Net
Goodwill                                         18               4.025.903.165.936        4.025.903.165.936                                                      Goodwill
Aset Tak Berwujud                                                                                                                                        Intangible Assets
   Hak Pengusahaan Jalan Tol                     20              48.651.414.597.542       47.516.603.311.042                              Toll Road Concession Rights
Aset Keuangan atas Proyek Konsesi                21                 299.766.867.393          313.400.181.972                    Financial Assets from Concession Project
Aset Pajak Tangguhan                             11d                 14.694.446.202           14.692.805.654                                         Deferred Tax Assets
Aset Lain-lain                                   19               1.503.271.262.187        1.021.313.332.758                                                 Other Assets
TOTAL ASET TIDAK LANCAR                                          72.155.317.943.262       64.802.073.704.397                          TOTAL NON-CURRENT ASSETS
TOTAL ASET                                                       96.320.731.647.742       98.232.316.628.846                                            TOTAL ASSETS

*) Direklasifikasi pada Catatan 58                                                                                                            *) As reclassified in Note 58




Catatan terlampir merupakan bagian yang tidak terpisahkan dari                                        The accompanying notes form an integral part of these
laporan keuangan konsolidasian.                                                                                         consolidated financial statements.


d6/February 5, 2014                                                      1                                                            paraf:
Page 5
                                                                                         The original consolidated financial statements included herein are in
                                                                                                                                    the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                                 PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                                                AND ITS SUBSIDIARIES
LAPORAN POSISI KEUANGAN                                                                   INTERIM CONSOLIDATED STATEMENTS OF
KONSOLIDASIAN INTERIM                                                                                              FINANCIAL POSITION
Tanggal 30 Juni 2023 dan 31 Desember 2022                                                          As of June 30, 2023 and December 31, 2022
(2022 – Diaudit)                                                                                                             (2022 – Audited)
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                                          (Expressed in full Rupiah amount, unless otherwise stated)

                                                                  30 Juni/               31 Desember/
                                                    Catatan/   June 30, 2023          December 31, 2022*)
                                                     Notes          Rp                        Rp


LIABILITAS DAN EKUITAS                                                                                                                            LIABILITIES AND EQUITY
LIABILITAS JANGKA PENDEK                                                                                                                             CURRENT LIABILITIES
Utang Usaha                                           22         7.179.063.756.744         7.449.149.336.334                                            Accounts Payable
Utang Bank Jangka Pendek                                                                                                                          Short-Term Bank Loans
   Pihak Ketiga                                       23           801.127.052.202           814.050.356.046                                              Third Parties
Utang Bruto Subkontraktor Jangka Pendek               25           950.702.469.036         1.416.572.543.120              Short-Term Gross Amounts Due to Subcontractors
Biaya yang Masih Harus Dibayar                        27         1.645.385.484.033         1.037.950.981.271                                          Accrued Expenses
Utang Pajak Jangka Pendek                             11b        2.870.446.447.774         3.390.069.013.227                                 Short-Term Taxes Payables
Uang Muka Kontrak Jangka Pendek                                                                                                         Advances on Short-Term Contracts
   Pihak Berelasi                                    26, 54          1.366.379.858             1.366.379.858                                            Related Parties
   Pihak Ketiga                                        26          896.450.409.024           794.891.016.374                                              Third Parties
Liabilitas Jangka Panjang yang Jatuh Tempo                                                                                                           Current Maturities of
   dalam Satu Tahun:                                                                                                                              Long-Term Liabilities:
      Utang Bank                                      31           868.374.290.640           278.498.960.269                                             Bank Loans
      Liabilitas Sewa Guna Usaha                      35             5.574.946.312             5.947.090.064                                         Lease Liabilities
      Surat Utang Jangka Menengah                     28           250.000.000.000           250.000.000.000                                    Medium Term Notes
      Utang Obligasi - Bersih                         29         6.566.269.921.111         5.203.935.622.504                                    Bonds Payable - Net
Liabilitas Jangka Pendek Lainnya                      30           757.376.661.067           810.455.086.223                                   Other Short-Term Liabilities
TOTAL LIABILITAS JANGKA PENDEK                                  22.792.137.817.801        21.452.886.385.290                                 TOTAL CURRENT LIABILITIES
LIABILITAS JANGKA PANJANG                                                                                                                   NON-CURRENT LIABILITIES
Utang Bank Jangka Panjang                                                                                                                          Long-Term Bank Loans
   Pihak Berelasi                                    31, 54     27.573.412.612.393        27.748.731.006.482                                            Related Parties
   Pihak Ketiga                                        31       18.569.906.710.815        18.722.152.107.875                                               Third Parties
Utang Ventura Bersama Jangka Panjang                   32          974.810.132.968         1.001.768.560.417                            Long-Term Joint Venture Payables
Utang Lembaga Keuangan Non Bank Jangka Panjang                                                                               Long-Term Non-Bank Financial Institution Loans
   Pihak Berelasi                                    24, 54      4.200.286.302.648         3.442.555.944.889                                            Related Parties
   Pihak Ketiga                                        24        1.155.086.946.521         1.096.291.023.651                                               Third Parties
Utang Bruto Jangka Panjang                                                                                                 Long-Term Gross Amounts Due to Subcontractors
   Pihak Ketiga                                       25           704.600.517.050           726.133.597.759                                               Third Parties
Uang Muka Kontrak Jangka Panjang                                                                                                        Advances on Long-Term Contracts
   Pihak Berelasi                                    34, 54         25.860.136.407            42.525.879.475                                            Related Parties
   Pihak Ketiga                                        34          620.819.717.192           646.114.112.796                                               Third Parties
Liabilitas Pajak Tangguhan                            11d            6.613.660.175             6.100.593.183                                        Deferred Tax Liabilities
Utang Pajak Jangka Panjang                            11b          283.619.686.764           395.990.566.546                                   Long-Term Taxes Payable
Utang Lain-lain Jangka Panjang                                                                                                                Other Long-Term Payables
   Pihak Ketiga                                       33         1.615.730.914.845         1.557.883.427.681                                               Third Parties
Liabilitas Jangka Panjang - Setelah Dikurangi                                                                                                       Long-Term Liabilities -
   Bagian Jatuh Tempo dalam Satu Tahun:                                                                                                     Net of Current Maturities:
      Liabilitas Sewa Guna Usaha                      35            24.370.225.076            32.463.806.486                                          Lease Liabilities
      Surat Utang Jangka Menengah                     28           475.000.000.000           475.000.000.000                                    Medium Term Notes
      Utang Obligasi - Bersih                         29         4.102.994.911.054         5.455.451.204.965                                    Bonds Payable - Net
Sukuk Mudharabah                                      29         1.144.962.917.523         1.144.905.871.186                                           Sukuk Mudharabah
Liabilitas Imbalan Kerja                              36            40.677.859.399            40.677.859.399                                   Employee Benefit Liabilities
TOTAL LIABILITAS JANGKA PANJANG                                 61.518.753.250.830        62.534.745.562.790                           TOTAL NON-CURRENT LIABILITIES
TOTAL LIABILITAS                                                84.310.891.068.631        83.987.631.948.080                                             TOTAL LIABILITIES

EKUITAS                                                                                                                                                               EQUITY
Modal Saham                                                                                                                                                      Share Capital
Modal Saham - Nilai Nominal Rp 100 per Saham                                                                                      Share Capital - Rp 100 par Value per Share
  Modal Dasar - 1 Saham Seri A Dwi Warna dan                                                                          Authorized Capital - 1 Dwi Warna Serie A Shares and
    54.295.803.999 Saham Seri B pada 30 Juni 2023                                                                      54,295,803,999 Serie B Shares at June 30, 2023
    dan 31 Desember 2022                                                                                                                         and December 31, 2022
  Modal Ditempatkan dan Disetor Penuh -                                                                                                   Subscribed and Fully Paid Capital
    1 Saham Seri A Dwi Warna dan 28.806.807.015                                                                        1 Dwi Warna Serie A Shares and 28,806,807,015
    Saham Seri B pada 30 Juni 2023                                                                                                      Serie B Shares at June 30, 2023
    dan 31 Desember 2022                              37         2.880.680.701.600         2.880.680.701.600                                     and December 31, 2022
Tambahan Modal Disetor                                38        13.565.914.226.785        13.565.914.226.785                                         Additional Paid-in Capital
Saldo Laba (Defisit)                                  39                                                                                           Retained Earnings (Deficit)
  Telah Ditentukan Penggunaannya                                  1.725.598.750.818         1.725.598.750.818                                                 Appropriated
  Belum Ditentukan Penggunaannya                               (12.012.837.745.957)       (9.940.244.897.000)                                               Unappropriated
Komponen Ekuitas Lainnya                                            867.035.749.725           867.396.329.210                                     Other Components of Equity
Jumlah Ekuitas yang Dapat Diatribusikan                                                                                                          Total Equity Attributable to
  Kepada Pemilik Perusahaan                                      7.026.391.682.971         9.099.345.111.413                                     Owners of the Company
Kepentingan Non-Pengendali                            46         4.983.448.896.140         5.145.339.569.353                                         Non-Controlling Interests
JUMLAH EKUITAS                                                  12.009.840.579.111        14.244.684.680.766                                                 TOTAL EQUITY
JUMLAH LIABILITAS DAN EKUITAS                                   96.320.731.647.742        98.232.316.628.846                              TOTAL LIABILITIES AND EQUITY

*) Direklasifikasi pada Catatan 58                                                                                                                *) As reclassified in Note 58




Catatan terlampir merupakan bagian yang tidak terpisahkan dari                                         The accompanying notes form an integral part of these
laporan keuangan konsolidasian.                                                                                          consolidated financial statements.


d6/February 5, 2014                                                      2                                                                  paraf:
Page 6
                                                                                          The original consolidated financial statements included herein are in
                                                                                                                                     the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                                 PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                                              AND ITS SUBSIDIARIES
LAPORAN LABA RUGI DAN                                                                     INTERIM CONSOLIDATED STATEMENTS OF
PENGHASILAN KOMPREHENSIF LAIN                                                                                  PROFIT OR LOSS AND
KONSOLIDASIAN INTERIM                                                                             OTHER COMPREHENSIVE INCOME
Untuk Periode-periode Enam Bulan yang Berakhir                                                            For the Six Months Periods Ended
30 Juni 2023 dan 2022 (2022 – Diaudit)                                                              June 30, 2023 and 2022 (2022 – Audited)
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                                             (Expressed in full Rupiah amount, unless otherwise stated)

                                                                          30 Juni/ June 30,
                                             Catatan/            2023                           2022*)
                                              Notes               Rp                             Rp


Pendapatan Usaha                               40, 54        5.272.672.423.294                  6.090.381.322.156                                            Revenues
Beban Pokok Pendapatan                           41        (4.810.088.511.668)                (5.433.200.906.305)                                    Cost of Revenues
LABA BRUTO                                                       462.583.911.626                 657.180.415.851                                      GROSS PROFIT

Beban Penjualan                                 42            (52.692.580.323)                   (57.793.331.517)                                    Selling Expenses
Beban Umum dan Administrasi                     42         (1.054.048.713.613)                 (887.819.343.035)                  General and Administrative Expenses
Beban Pajak Final                               11            (90.972.366.135)                 (131.256.123.586)                                  Final Tax Expenses
Pendapatan Bunga                                               537.531.816.214                   565.605.514.693                                       Interest Income
Keuntungan Selisih Kurs - Bersih                                (5.049.753.986)                   (1.471.685.934)                     Gain on Foreign Exchange - Net
Pendapatan Lain - lain - Bersih                 43             349.217.386.098                 2.487.519.828.584                                  Other Income - Net

LABA SEBELUM BEBAN KEUANGAN                                                                                                  PROFIT BEFORE FINANCIAL CHARGES
  DAN LABA (RUGI) BERSIH                                                                                                    AND EQUITY IN NET PROFIT (LOSS) OF
   ENTITAS ASOSIASI DAN VENTURA BERSAMA                          146.569.699.881               2.631.965.275.056            ASSOCIATES AND JOINT VENTURES

Beban Keuangan                                  44         (2.079.553.962.639)                (1.966.459.822.098)                                     Finance Charges
Bagian Laba (Rugi) Bersih                                                                                                                    Equity in Net Profit (Loss)
  Entitas Asosiasi dan Ventura Bersama          45           (228.996.976.527)                 (213.549.974.494)                    of Associates and Joint Ventures
LABA (RUGI) SEBELUM PAJAK                                  (2.161.981.239.285)                   451.955.478.464                       PROFIT (LOSS) BEFORE TAX

Beban Pajak Penghasilan                         11               (72.414.485.066)              (158.035.141.851)                                 Income Tax Expenses
LABA (RUGI) PERIODE BERJALAN                               (2.234.395.724.351)                   293.920.336.613                   PROFIT (LOSS) FOR THE PERIOD

PENGHASILAN (BEBAN) KOMPREHENSIF LAIN                                                                                      OTHER COMPREHENSIVE INCOME (LOSS)
Pos-pos yang Tidak Akan                                                                                                            Items that Will Not Be Reclassified
  Direklasifikasi Kemudian ke Laba Rugi                                                                                              Subsequently to Profit or Loss
  Pengukuran Kembali Program                                                                                                              Remeasurement of Defined
    Imbalan Pasti - Bersih                                              87.797.819                (3.863.272.912)                          Benefit Obligations - Net

Pos yang Akan Direklasifikasi                                                                                                         Item that May Be Reclassified
  Kemudian ke Laba Rugi                                                                                                             Subsequently to Profit or Loss
  Selisih Kurs Penjabaran                                                                                                       Exchange Differences on Transalation
    Laporan Keuangan dari Kegiatan                                                                                                      of Financial Statements of
       Operasi Luar Negeri                                         (448.377.304)                         (543.130)                           Foreign Operations

Total Beban Komprehensif Lain                                                                                                               Total Other Comprehensive
  Periode Berjalan                                                 (360.579.485)                  (3.863.816.042)                                Loss For The Period
TOTAL LABA (RUGI) KOMPREHENSIF                                                                                             TOTAL COMPREHENSIVE INCOME (LOSS)
 PADA PERIODE BERJALAN                                     (2.234.756.303.836)                   290.056.520.571                           FOR THE PERIOD


LABA (RUGI) YANG DAPAT DIATRIBUSIKAN KEPADA:                                                                                     PROFIT (LOSS) ATTRIBUTABLE TO:
  Pemilik Perusahaan                                       (2.072.505.051.138)                 (236.517.657.332)                           Owners of the Company
  Kepentingan Non-Pengendali                    46           (161.890.673.213)                   530.437.993.945                            Non-Controlling Interest

LABA (RUGI) PERIODE BERJALAN                               (2.234.395.724.351)                   293.920.336.613                   PROFIT (LOSS) FOR THE PERIOD

JUMLAH LABA (RUGI) KOMPREHENSIF YANG DAPAT                                                                                 TOTAL COMPREHENSIVE INCOME (LOSS)
  DIATRIBUSIKAN KEPADA:                                                                                                                   ATTRIBUTABLE TO:
    Pemilik Perusahaan                                     (2.072.865.630.623)                 (240.381.473.374)                      Owners of the Company
    Kepentingan Non-Pengendali                  46           (161.890.673.213)                   530.437.993.945                       Non-Controlling Interest

JUMLAH LABA (RUGI) KOMPREHENSIF                                                                                            TOTAL COMPREHENSIVE INCOME (LOSS)
  PADA PERIODE BERJALAN                                    (2.234.756.303.836)                   290.056.520.571                           FOR THE PERIOD


Rugi per saham                                                                                                                                          Loss per share
 Dasar                                          47                         (71,94)                          (8,21)                                             Basic

*) Direklasifikasi pada Catatan 58                                                                                                          *) As reclassified in Note 58




Catatan terlampir merupakan bagian yang tidak terpisahkan dari                                            The accompanying notes form an integral part of these
laporan keuangan konsolidasian.                                                                                             consolidated financial statements.


d6/February 5, 2014                                                       3                                                              paraf:
Page 7
                                                                                                                                                                                                                                                     The original consolidated financial statements included herein are in
                                                                                                                                                                                                                                                                                                the Indonesian language.

PT WASKITA KARYA (PERSERO) TBK                                                                                                                                                                                                  PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                                                                                                                                                                                     AND ITS SUBSIDIARIES
LAPORAN PERUBAHAN EKUITAS KONSOLIDASIAN INTERIM                                                                                                                                                INTERIM CONSOLIDATED STATEMENTS OF CHANGES IN EQUITY
Untuk Periode-periode Enam Bulan yang Berakhir 30 Juni 2023 dan 2022 (2022 – Diaudit)                                                                                                                 For the Six Months Periods Ended June 30, 2023 and 2022 (2022 – Audited)
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                                                                                                                                                                      (Expressed in full Rupiah amount, unless otherwise stated)
                                                                                                      Dapat Diatribusikan kepada Pemilik Entitas Induk/ Attributable to the Owners of the Company
                                                                                                                                                                                       Komponen Ekuitas Lainnya/
                                                                                                                                                                                       Other Components of Equity
                                                                            Tambahan Modal                    Saldo Laba (Defisit)/ Retained Earnings (Deficit)               Selisih Kurs Penjabaran      Surplus (Defisit)                               Kepentingan
                                                                                 Disetor/               Ditentukan          Belum Ditentukan                                    Laporan Keuangan/             Revaluasi/                                  Non-Pengendali/        Jumlah Ekuitas/
                                                       Modal Saham/         Additional Paid-In        Penggunaannya/         Penggunaannya/               Jumlah/                Foreign Currency           Revaluation                Jumlah/            Non-Controlling            Total
                                            Catatan/   Share Capital             Capital               Appropriated          Unappropriated                 Total             Translation Adjustment      Surplus (Deficit)             Total                Interests              Equity
                                             Notes          Rp                     Rp                       Rp                       Rp                      Rp                          Rp                      Rp                      Rp                     Rp                    Rp

SALDO PER 31 DESEMBER 2021                             2.631.588.647.500      12.495.837.749.847       1.732.187.379.878      (7.693.325.785.145)     (5.961.138.405.267)                  6.605.043.161      896.880.334.034       10.069.773.369.275     5.391.659.874.555     15.461.433.243.830             BALANCE AS OF DECEMBER 31, 2021

Penambahan Modal melalui Transaksi HMETD     37, 38      249.092.054.100       1.295.278.681.320                       --                      --                      --                             --                       --    1.544.370.735.420                     --     1.544.370.735.420             Additional Capital with Pre- Emptive Rights
Obligasi Wajib Konversi dari Entitas Anak                              --                      --                      --                      --                      --                             --                       --                    --    3.842.084.973.394      3.842.084.973.394             Mandatory Convertible Bond of Subsidiary
Rugi Periode Berjalan                                                  --                      --                      --       (236.517.657.332)       (236.517.657.332)                             --                       --    (236.517.657.332)       530.437.993.945        293.920.336.613                                      Loss for the Period
Penyesuaian atas Perubahan Kepemilikan                                                                                                                                                                                                                                                                               Adjustment for Changes in Ownership
 Entitas Anak                                 46                       --            900.000.000                       --       (212.834.264.120)       (212.834.264.120)                             --                       --    (211.934.264.120)      (988.929.617.819)    (1.200.863.881.939)                                     in Subsidiaries
Pengukuran Kembali Program Imbalan Pasti                                                                                                                                                                                                                                                                                      Remeasurement of Defined
  Bersih                                                               --                        --                    --            162.623.128              162.623.128                             --       (3.863.272.912)          (3.700.649.784)                     --       (3.700.649.784)                    Benefits Obligations Plan - Net
Selisih Kurs Penjabaran Laporan Keuangan                                                                                                                                                                                                                                                                               Exchange Difference on translation
 dari Kegiatan Usaha Luar Negeri                                       --                        --                    --                      --                       --                     (543.130)                       --            (543.130)                      --            (543.130)     of Financial Statements of Foreign Operations
SALDO PER 30 JUNI 2022                                 2.880.680.701.600      13.792.016.431.167       1.732.187.379.878      (8.142.515.083.469)     (6.410.327.703.591)                  6.604.500.031      893.017.061.122       11.161.990.990.329     8.775.253.224.075     19.937.244.214.404                    BALANCE AS OF JUNE 30, 2022
Reklasifikasi Obligasi Wajib Konversi                                                                                                                                                                                                                                                                     Reclassification of Mandatory Convertible Bond
   dari Entitas anak                                                   --                        --                    --                      --                       --                            --                       --                    --   (3.842.084.973.394)    (3.842.084.973.394)                                        of Subsidiary

SALDO PER 30 JUNI 2022                                                                                                                                                                                                                                                                                                 BALANCE AS OF JUNE 30, 2022
   (Setelah Reklasifikasi)                             2.880.680.701.600      13.792.016.431.167       1.732.187.379.878      (8.142.515.083.469)     (6.410.327.703.591)                  6.604.500.031      893.017.061.122       11.161.990.990.329     4.933.168.250.681     16.095.159.241.010                        (After Reclassification)

SALDO PER 31 DESEMBER 2022                             2.880.680.701.600      13.565.914.226.785       1.725.598.750.818      (9.940.244.897.000)     (8.214.646.146.182)                  5.809.453.285      861.586.875.925        9.099.345.111.413     5.145.339.569.353     14.244.684.680.766             BALANCE AS OF DECEMBER 31, 2022

Rugi Periode Berjalan                                                  --                        --                    --     (2.072.505.051.138)     (2.072.505.051.138)                             --                       --   (2.072.505.051.138)     (161.890.673.213)    (2.234.395.724.351)                                   Loss for the Period
Pengukuran Kembali Program Imbalan Pasti                                                                                                                                                                                                                                                                                     Remeasurement of Defined
    Bersih                                                             --                        --                    --            (87.797.819)            (87.797.819)                             --           87.797.819                        --                     --                     --                       Benefits Obligations - Net
Selisih Kurs Penjabaran Laporan Keuangan                                                                                                                                                                                                                                                                           Exchange of Differences on translation
    dari Kegiatan Usaha Luar Negeri                                    --                        --                    --                      --                       --                 (448.377.304)                       --        (448.377.304)                      --        (448.377.304)     of Financial Statements of Foreign Operations
SALDO PER 30 JUNI 2023                                 2.880.680.701.600      13.565.914.226.785       1.725.598.750.818     (12.012.837.745.957)    (10.287.238.995.139)                  5.361.075.981      861.674.673.744        7.026.391.682.971     4.983.448.896.140     12.009.840.579.111                    BALANCE AS OF JUNE 30, 2023




Catatan terlampir merupakan bagian yang tidak terpisahkan dari                                                                                                                                                                                                        The accompanying notes form an integral part of these
laporan keuangan konsolidasian.                                                                                                                                                                                                                                                         consolidated financial statements.
d6/February 5, 2014                                                                                                                                                          4                                                                                                                                     paraf:
Page 8
                                                                                    The original consolidated financial statements included herein are in
                                                                                                                               the Indonesian language.

PT WASKITA KARYA (PERSERO) TBK                                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                                            AND ITS SUBSIDIARIES
LAPORAN ARUS KAS                                                                          INTERIM CONSOLIDATED STATEMENTS
KONSOLIDASIAN INTERIM                                                                                               OF CASH FLOWS
Untuk Periode-periode Enam Bulan yang Berakhir                                                          For the Six Months Periods Ended
30 Juni 2023 dan 2022 (2022 – Diaudit)                                                            June 30, 2023 and 2022 (2022 – Audited)
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                                      (Expressed in full Rupiah amount, unless otherwise stated
                                                                         30 Juni/ June 30,
                                                 Catatan/         2023                        2022*)
                                                  Notes            Rp                          Rp

ARUS KAS DARI AKTIVITAS OPERASI                                                                                      CASH FLOWS FROM OPERATING ACTIVITIES

Penerimaan Kas dari Pelanggan                                 7.003.902.231.017            6.428.116.786.145                         Cash Receipts from Customers
Pengeluaran Kas kepada Pemasok                              (5.512.894.514.950)          (4.441.532.039.799)                                 Cash Paid to Suppliers
Pengeluaran Kas kepada Karyawan dan Direksi                   (445.799.651.811)            (393.071.247.913)                   Cash Paid to Employees and Directors

Kas Dihasilkan dari Operasi                                   1.045.208.064.256            1.593.513.498.433                         Cash Generated from Operations
Pembayaran Beban Keuangan                                     (607.739.071.685)          (1.075.175.614.373)                            Payment of Finance Charges
Penerimaan Restitusi Pajak                         11            11.898.940.732              254.657.777.436                            Receipt from Tax Restitutions
Pembayaran Pajak                                            (1.437.701.309.326)            (195.811.472.263)                                       Payment of Taxes
Kas Bersih (Digunakan untuk) Diperoleh Dari                                                                                          Net Cash (Used in) Provided by
 Aktivitas Operasi                                           (988.333.376.023)               577.184.189.233                                  Operating Activities

ARUS KAS DARI AKTIVITAS INVESTASI                                                                                     CASH FLOWS FROM INVESTING ACTIVITIES

Penerimaan dari Ventura Bersama                                    39.684.328.415               98.680.603.293                            Receipt from Joint Ventures
Penempatan pada Ventura Bersama                                  (33.291.330.958)            (114.375.411.273)                            Placement of Joint Ventures
Perolehan Aset Tetap                                             (21.723.600.953)            (159.285.396.938)                             Acquisition of Fixed Assets
Penerimaan Penjualan Aset Tetap                                     4.597.669.351                            --                    Proceed from Sale of Fixed Assets
Penerimaan atas Pengembalian Pinjaman                            184.168.799.025                             --                      Receipt from Loans Repayment
Penerimaan atas Pelepasan Penyertaan                                                                                              Receipt from Disposal of Investment
 Pada Entitas Anak dan Asosiasi                                              --              625.195.052.060                          In Subsidiaries and Associates
Perolehan Aset Tak Berwujud                                 (1.240.897.567.877)            (419.805.747.890)                           Acquisition of Intangible Assets
Pinjaman Diberikan kepada Entitas Asosiasi                    (142.930.100.408)          (3.250.465.811.099)                           Additional Loans to Associates
Kas Bersih Digunakan untuk Aktivitas Investasi              (1.210.391.803.405)          (3.220.056.711.847)                  Net Cash Used in Investing Activities

ARUS KAS DARI AKTIVITAS PENDANAAN                                                                                    CASH FLOWS FROM FINANCING ACTIVITIES

Pelunasan Utang Obligasi                           50                         --         (1.394.000.000.000)                                Payment of Bonds Payable
Penerimaan Pendapatan Bunga                                      24.692.835.754               79.973.926.150                              Receipt from Interest Income
Pembayaran Beban Keuangan                                    (681.741.247.236)           (1.039.964.248.135)                            Payment for Finance Charges
Pembayaran Emisi Obligasi                          50                         --              (8.766.125.000)                       Payment of Bond Issuance Costs
Pembayaran Emisi Sukuk Mudharabah                  50                         --              (3.336.771.580)                   Payment of Sukuk Mudharabah Costs
Penerimaan Penerbitan Obligasi                     50                         --           2.127.300.000.000                               Receipt from Bond Issuance
Penerimaan Penerbitan Sukuk Mudharabah             50                         --           1.148.100.000.000               Receipt from Sukuk Mudharabah Issuance
Penerimaan Pinjaman Bank Janka Pendek              50            12.000.000.000               77.284.443.053                    Receipt from Short-Term Bank Loans
Penerimaan Pinjaman Bank Janka Panjang             50          622.653.667.389             3.942.971.194.799                     Receipt from Long-Term Bank Loans
Pembayaran Pinjaman Bank Jangka Pendek             50          (24.923.303.844)            (325.000.000.000)                      Payment of Short-Term Bank Loans
Pembayaran Pinjaman Bank Jangka Panjang            50        (531.755.322.595)           (5.666.307.679.589)                       Payment of Long-Term Bank Loans
Penerimaan Penerbitan Modal Saham                                             --           1.544.370.735.420                      Receipt from Share Capital Issuance
Penerimaan Pinjaman Lembaga Keuangan Non-Bank      50          816.526.280.629                95.991.424.539         Receipt from Non Bank Financial Institution Loans
Pembayaran Liabilitas Sewa                         50          (10.619.530.907)               (1.423.527.252)                              Payment of Lease Liabilities
Penurunan Kas yang dibatasi penggunaanya                     1.468.267.081.553                21.448.626.049                              Decrease in Restricted Cash
Kas Bersih (Digunakan untuk)                                                                                                            Net Cash (Used in) Provided
 Diperoleh dari Aktivitas Pendanaan                          1.695.100.460.743                598.641.998.454                               by Financing Activities

KENAIKAN (PENURUNAN) BERSIH KAS DAN                                                                                    NET INCREASE (DECREASE) IN CASH AND
 SETARA KAS                                                  (503.624.718.685)           (2.044.230.524.160)                            CASH EQUIVALENTS

KEUNTUNGAN (KERUGIAN) SELISIH KURS YANG                                                                                              UNREALIZED GAIN (LOSS) ON
 BELUM DIREALISASI                                                6.162.651.364                (1.280.270.181)                        FOREIGN EXCHANGE RATE


EFEK DIVESTASI                                                                --              (17.506.578.510)                            EFFECT OF DIVESTMENT


KAS DAN SETARA KAS                                                                                                                CASH AND CASH EQUIVALENTS
 PADA AWAL TAHUN                                            2.221.541.281.141            13.165.761.250.874                        AT THE BEGINNING OF YEAR

KAS DAN SETARA KAS                                                                                                                CASH AND CASH EQUIVALENTS
 PADA AKHIR TAHUN                                   3       1.724.079.213.820            11.102.743.878.023                              AT THE END OF YEAR



*) Direklasifikasi pada Catatan 58                                                                                                       *) As reclassified in Note 58




Catatan terlampir merupakan bagian yang tidak terpisahkan dari                                    The accompanying notes form an integral part of these
laporan keuangan konsolidasian.                                                                                     consolidated financial statements.
d6/February 5, 2014                                                      5                                                                     paraf:
Page 9
                                                                       The original consolidated financial statements included herein are in
                                                                                                                  the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                       AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT)                                                                            (2022 – AUDITED)
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)              (Expressed in full Rupiah amount, unless otherwise stated)

1.   UMUM                                                       1.     GENERAL

     a.   Pendirian dan Informasi Umum                                 a.    Establishment and General Information

          Perusahaan       Negara      Waskita      Karya                    The State-owned entity Waskita Karya
          (“Perusahaan”) didirikan pada tanggal 1 Januari                    (“the Company”) was established on January 1,
          1961 berdasarkan Peraturan Pemerintah No. 62                       1961 based on Government Regulation No. 62
          tahun 1961, dari Perusahaan asing bernama                          year 1961, from a foreign company named
          "Volker Aanemings Maatschappij NV" yang                            "Volker Aanemings Maatschappij NV" which was
          dinasionalisasi Pemerintah Republik Indonesia.                     nationalized by the Government of the Republic
          Perusahaan       memulai     kegiatan     usaha                    of Indonesia. The Company started its
          komersialnya pada tanggal 1 Januari 1961.                          commercial operations on January 1, 1961.

          Berdasarkan Peraturan Pemerintah No. 40 tahun                      According to Government Regulation No. 40 year
          1970 status Perusahaan berubah dari Perusahaan                     1970, the Company’s status was changed from
          Negara (PN) menjadi Perseroan (Persero).                           State Enterprise into Perseroan (Persero).
          Selanjutnya, Perusahaan dinamakan PT Waskita                       Furthermore, the Company was named as
          Karya (Persero) berdasarkan Akta Perseroan                         PT Waskita Karya (Persero) in accordance with
          Terbatas No. 80 tanggal 15 Maret 1973, yang                        the Deed of Limited Liability Corporation No. 80
          dibuat di hadapan Kartini Mulyadi, S.H., Notaris di                dated March 15, 1973 of Kartini Mulyadi, S.H.,
          Jakarta. Akta Perseroan Terbatas tersebut telah                    Notary in Jakarta. The deed was approved by
          disahkan oleh Menteri Kehakiman pada tanggal                       the Minister of Law on August 20, 1973 in his
          20 Agustus 1973 dengan Surat Keputusan                             Decree No. 4.a.5/310/3 and stated on State
          No. 4.a.5/310/3 serta diumumkan dalam Berita                       Gazette of Republic of Indonesia No. 82 on
          Negara Republik Indonesia No. 82 tanggal                           November 13, 1973, Supplement No. 91.
          13 November 1973, Tambahan Berita Negara
          No. 91.

          Anggaran Dasar Perusahaan telah beberapa kali                      The Company's Articles of Association has been
          mengalami perubahan, terakhir berdasarkan akta                     amended several times, most recently by notarial
          notaris No. 6 tanggal 21 Januari 2022 yang dibuat                  deed No. 6 dated January 21, 2022 by Notary
          dihadapan Notaris Ashoya Ratam, S.H., M.Kn., di                    Ashoya Ratam, S.H., M.Kn., in Jakarta, which has
          Jakarta, yang telah mendapatkan Persetujuan                        obtained Approval for Amendment to the
          Perubahan Anggaran Dasar Perseroan No. AHU-                        Company's Articles of Association No. AHU-
          0014815.AH.01.11 tanggal 21 Januari 2022 dan                       0014815.AH.01.11 dated January 21, 2022 and
          Penerimaan Pemberitahuan Perubahan Anggaran                        Acceptance of Notification of Amendment to
          Dasar dari Kementerian Hukum dan Hak Asasi                         the Articles of Association from the Ministry of
          Manusia Republik Indonesia No. AHU-AH.01.03-                       Law and Human Rights of the Republic of
          0048528 tanggal 22 Januari 2022. Anggaran                          Indonesia No. AHU-AH.01.03-0048528 dated
          Dasar Perusahaan mengalami perubahan terkait                       January 22, 2022. The Company's Articles of
          pasal 4 ayat 2 dan 3 tentang persetujuan                           Association have been amended related to article
          pemegang saham Perseroan untuk meningkatkan                        4 paragraphs 2 and 3 regarding approval of the
          modal ditempatkan dan disetor sejumlah sejumlah                    Company's shareholders to increase the issued
          2.490.920.541 saham baru seri B yang merupakan                     and paid-up capital by 2,490,920,541 new series
          saham baru hasil pelaksanaan Hak Memesan                           B shares which are new shares resulted from the
          Efek    Terlebih    Dahulu,    sehingga    modal                   exercise of Pre-emptive Rights, so that the new
          ditempatkan dan disetor dari yang semula sebesar                   issued and paid-up capital of the original
          Rp2.631.588.647.500       yang     terbagi   atas                  amounting to Rp2,631,588,647,500 which is
          26.315.886.475 lembar saham yang terdiri dari                      divided into 26,315,886,475 shares consisting of
          1 saham Seri A Dwiwarna atau setara dengan                         1 Series A Dwiwarna share or equivalent to
          Rp100 dan 26.315.886.474 saham Seri B atau                         Rp100 and 26,315,886.474 Series B shares or
          setara dengan Rp2.631.588.647.400 menjadi                          equivalent     to    Rp2,631,588,647,400      to
          sebesar Rp2.880.680.701.600 yang terbagi atas                      Rp2,880,680,701,600 which is divided into
          28.806.807.016 lembar saham yang terdiri dari                      28,806,807,016 shares consisting of 1 Dwiwarna
          1 saham Seri A Dwiwarna atau setara dengan                         Series A share or equivalent to Rp100 and
          Rp100 dan 28.806.807.015 saham Seri B atau                         28,806,807,015 Series B shares or equivalent to
          setara dengan Rp2.880.680.701.500.                                 Rp2,880,680,701,500.

          Perusahaan berkedudukan di Jakarta, dengan                         The Company is domiciled in Jakarta, with
          kantor pusat beralamat di Jl. MT Haryono Kav. No.                  the head office located at Jl. MT Haryono Kav.
          10 Cawang, Jakarta 13340.                                          No. 10 Cawang, Jakarta 13340.

                                                           6
Page 10
                                                                                                         The original consolidated financial statements included herein are in
                                                                                                                                                    the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                                               PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                                                         AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                           NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                                                     FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                                            AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                                                   MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                                                       (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                                               (Expressed in full Rupiah amount, unless otherwise stated)

    b. Entitas Anak                                                                                       b.      Subsidiaries

         Grup memiliki kepemilikan langsung dan tidak                                                             The Group has more than 50% direct and indirect
         langsung lebih dari 50% saham pada entitas anak                                                          ownership interest in subsidiaries and/or has
         dan/atau mempunyai kendali atas manajemen                                                                control over consolidated subsidiaries as follows:
         entitas anak yang dikonsolidasi sebagai berikut:

         a.    Kepemilikan Langsung                                                                               a.           Direct Ownership

                                                                                                                                                   Sebelum Eliminasi/ Before Elimination
                                                                                                                                                           30 Juni/ June 30, 2023
                                                                                                                                   Persentase                                Jumlah Laba
                                                                                                                                   Kepemilikan/                              (Rugi) Bersih
                                                                                                                                   Percentage                             Periode Berjalan/
                                                                                                                                       of         Jumlah Aset/         Total Net Income (Loss)
                           Entitas Anak/         Domisili/        Jenis Usaha/                   Tahun Operasi Komersial/          Ownerships     Total Assets                for the Year
                           Subsidiaries         Domiciled      Nature of Business             Start of Commercial Operations           %               Rp                          Rp
               PT Waskita Toll Road              Jakarta         Jalan Tol/ Toll Road                     2014                        92,53       64.789.554.149.855           (435.778.784.440)
               PT Waskita Beton Precast Tbk      Jakarta          Industri Pabrikasi/                     2014                        59,99        5.356.181.301.154           (263.760.697.631)
                                                                     Fabrication
               PT Waskita Karya Realty           Jakarta          Properti/ Property                      2015                        99,99       6.090.607.042.315             (30.927.484.720)
               PT Waskita Karya Infrastruktur    Jakarta        Industri Pabrikasi dan                    2016                        99,99         820.732.278.160             (38.410.416.218)
                                                             Investasi/ Fabrication and
                                                                     Investment
                                                                                                                                                   Sebelum Eliminasi/ Before Elimination
                                                                                                                                                     31 Desember/ December 31, 2022
                                                                                                                                   Persentase                               Jumlah Laba
                                                                                                                                   Kepemilikan/                             (Rugi) Bersih
                                                                                                                                   Percentage                            Periode Berjalan/
                                                                                                                                       of         Jumlah Aset/        Total Net Income (Loss)
                           Entitas Anak/         Domisili/        Jenis Usaha/                   Tahun Operasi Komersial/          Ownerships     Total Assets               for the Year
                           Subsidiaries         Domiciled      Nature of Business             Start of Commercial Operations           %               Rp                         Rp
               PT Waskita Toll Road              Jakarta         Jalan Tol/ Toll Road                     2014                        92,31       63.033.591.627.563            512.106.010.863
               PT Waskita Beton Precast Tbk      Jakarta          Industri Pabrikasi/                     2014                        59,99        5.963.657.951.878            675.769.677.491
                                                                     Fabrication
               PT Waskita Karya Realty           Jakarta          Properti/ Property                      2015                        99,99       6.078.762.058.291               11.387.290.720
               PT Waskita Karya Infrastruktur    Jakarta        Industri Pabrikasi dan                    2016                        99,99         858.816.949.482             (39.982.789.141)
                                                             Investasi/ Fabrication and
                                                                     Investment


        b.    Kepemilikan Tidak Langsung                                                                         b.      Indirect Ownership

                                                                                                                                                   Sebelum Eliminasi/ Before Elimination
                                                                                                                                                           30 Juni/ June 30, 2023
                                                                                                                                   Persentase                                Jumlah Laba
                                                                                                                                   Kepemilikan/                              (Rugi) Bersih
                                                                                                                                   Percentage                             Periode Berjalan/
                                                                                                                                       of         Jumlah Aset/         Total Net Income (Loss)
                           Entitas Anak/         Domisili/        Jenis Usaha/                   Tahun Operasi Komersial/          Ownerships     Total Assets                for the Year
                           Subsidiaries         Domiciled      Nature of Business             Start of Commercial Operations           %               Rp                          Rp
               PT Waskita Sangir Energi          Jakarta          Energi/ Energy                          2016                        94,70         375.228.241.021                  729.269.336
               PT Waskita Wado Energi            Jakarta          Energi/ Energy               Dalam Tahap Pengembangan/              99,99          32.082.781.958              (2.098.691.609)
                                                                                                   Development Stage
               PT Trans Jabar Tol                Jakarta       Jalan Tol/ Toll Road                       2019                        99,99        7.053.674.292.421            (15.582.364.771)
               PT Pemalang Batang Toll Road      Jakarta       Jalan Tol/ Toll Road                       2018                        60,00        7.688.784.644.988            (59.946.439.629)
               PT Waskita Sriwijaya Tol         Palembang      Jalan Tol/ Toll Road                       2020                        99,49       17.803.079.144.924            (22.649.400.708)
               PT Waskita Bumi Wira               Gresik       Jalan Tol/ Toll Road                       2020                        99,91       12.149.317.159.299           (326.236.516.296)
               PT Waskita Transjawa Toll Road    Jakarta       Jalan Tol/ Toll Road                       2015                        87,80        9.741.343.776.376               2.756.876.119
               PT Transjawa Paspro jalan Tol     Jakarta       Jalan Tol/ Toll Road                       2019                        99,99        5.829.847.862.363           (173.021.650.197)
               PT Tol Teluk Balikpapan          Balikpapan     Jalan Tol/ Toll Road            Dalam Tahap Pengembangan/                              32.472.448.530                     284.335
                                                                                                                                      80,00
                                                                                                   Development Stage
               PT Waskita Fim Perkasa Realti     Jakarta         Properti/ Property                       2018                        90,00        1.329.800.374.677               7.914.231.360
               PT Waskita Modern Realty          Jakarta         Properti/ Property                       2018                        60,00          286.887.905.823             (2.530.466.335)




                                                                                          7
Page 11
                                                                                                   The original consolidated financial statements included herein are in
                                                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                                         PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                                                   AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                     NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                                               FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                                      AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                                             MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                                                 (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                                        (Expressed in full Rupiah amount, unless otherwise stated)

                                                                                                                                        Sebelum Eliminasi/ Before Elimination
                                                                                                                                          31 Desember/ December 31, 2022
                                                                                                                        Persentase                               Jumlah Laba
                                                                                                                        Kepemilikan/                             (Rugi) Bersih
                                                                                                                        Percentage                            Periode Berjalan/
                                                                                                                            of         Jumlah Aset/        Total Net Income (Loss)
                         Entitas Anak/          Domisili/      Jenis Usaha/               Tahun Operasi Komersial/      Ownerships     Total Assets               for the Year
                         Subsidiaries          Domiciled    Nature of Business         Start of Commercial Operations       %               Rp                         Rp
              PT Waskita Sangir Energi          Jakarta       Energi/ Energy                        2016                   94,70         380.634.017.221             22.669.154.621
              PT Waskita Wado Energi            Jakarta       Energi/ Energy            Dalam Tahap Pengembangan/          99,99          29.297.924.665                    886.180
                                                                                            Development Stage
              PT Trans Jabar Tol                Jakarta     Jalan Tol/ Toll Road          Februari/ February 2019          99,99        6.747.463.642.252          (148.467.978.284)
              PT Pemalang Batang Toll Road      Jakarta     Jalan Tol/ Toll Road         November/ November 2018           60,00        7.676.847.270.566          (161.165.210.669)
              PT Waskita Sriwijaya Tol         Palembang    Jalan Tol/ Toll Road                    2020                   99,49       16.902.395.548.206          (150.239.913.543)
              PT Waskita Bumi Wira               Gresik     Jalan Tol/ Toll Road         Desember/ December 2020           99,91       12.202.518.654.204          (919.547.059.365)
              PT Waskita Transjawa Toll Road    Jakarta     Jalan Tol/ Toll Road                    2015                   87,80        9.879.442.319.163          (141.950.708.613)
              PT Transjawa Paspro jalan Tol     Jakarta     Jalan Tol/ Toll Road                    2019                   99,99        5.626.504.169.008          (273.881.818.964)
              PT Tol Teluk Balikpapan          Balikpapan   Jalan Tol/ Toll Road        Dalam Tahap Pengembangan/                          32.562.815.362                (5.834.785)
                                                                                                                           80,00
                                                                                            Development Stage
              PT Waskita Fim Perkasa Realti     Jakarta      Properti/ Property                     2018                   90,00        1.329.084.382.920            14.763.406.709
              PT Waskita Modern Realty          Jakarta      Properti/ Property                     2018                   60,00          471.363.395.194            (3.139.263.770)


              PT Waskita Toll Road (WTR)                                                                           PT WaskitaToll Road (WTR)

              Pendirian WTR (entitas anak) adalah sesuai                                                           The establishment of WTR (subsidiary) was
              dengan akta notaris No. 62 tanggal 19 Juni                                                           based on notarial deed No. 62 dated June
              2014 dari notaris Fathiah Helmi, S.H. Akta                                                           19, 2014 of notary Fathiah Helmi, S.H.
              pendirian ini telah mendapat persetujuan oleh                                                        The deed was approved by the Minister of
              Menteri Hukum dan Hak Asasi Manusia                                                                  Law    and    Human      Rights   through
              melalui surat keputusan No. AHU-14734.                                                               the decision letter No. AHU-14734.40.10.
              40.10.2014 tanggal 25 Juni 2014.                                                                     2014 dated June 25, 2014.

              Anggaran Dasar WTR telah beberapa kali                                                               WTR's Articles of Association have been
              mengalami perubahan, terakhir berdasarkan                                                            amended several times, most recently based
              akta notaris No. 12 tanggal 27 Januari 2023                                                          on notarial deed No. 12 dated January 27,
              oleh Zulkifli Harahap, S.H., dimana                                                                  2023 by Zulkifli Harahap, S.H., wherein
              Perusahaan        meningkatkan       modal                                                           the Company increased its issued and paid-
              ditempatkan dan disetor kepada WTR                                                                   up capital in WTR amounting to
              sebesar     Rp762.777.735.984     sehingga                                                           Rp762,777,735,984 so the Company
              kepemilikan Perusahaan berubah menjadi                                                               ownership change to 92,53%.
              92,53%.

              PT Waskita Beton Precast Tbk (WBP)                                                                   PT Waskita Beton Precast Tbk (WBP)

              PT Waskita Beton Precast Tbk (Perusahaan)                                                            PT     Waskita     Beton    Precast    Tbk
              didirikan berdasarkan Akta No. 10 tanggal                                                            (the “Company”) was established based on
              7 Oktober 2014 dari Fathiah Helmi, S.H.,                                                             notarial deed No. 10 dated October 7, 2014
              notaris publik di Jakarta dan telah mendapat                                                         by Fathiah Helmi, S.H., public notary in
              pengesahan dari Menteri Hukum dan Hak                                                                Jakarta, and has been approved by
              Asasi Manusia Republik Indonesia melalui                                                             the Minister of Law and Human Rights of
              surat keputusan No. AHU-29347.40.10.2014                                                             the Republic of Indonesia through his
              tanggal 14 Oktober 2014 serta diumumkan                                                              decision letter No. AHU-29347.40.10.2014
              dalam Berita Negara Republik Indonesia                                                               dated October 14, 2014 and was published
              No. 60221 Tambahan No. 103 tanggal                                                                   in the State Gazette of the Republic of
              26 Desember 2014.                                                                                    Indonesia No. 60221 Supplement No. 103
                                                                                                                   dated December 26, 2014.

              Anggaran Dasar WBP telah beberapa kali                                                               WBP’s Articles of Association had been
              mengalami perubahan, terakhir berdasarkan                                                            amended several times, most recently based
              Akta Pernyataan Keputusan Rapat Umum                                                                 on the Extraordinary General Meeting’ of
              Pemegang Saham Luar Biasa No. 45 tanggal                                                             Shareholders’ Deed of Decision No. 45 dated
              20 Desember 2022 dari Ashoya Ratam S.H.,                                                             December 20, 2022 by Ashoya Ratam S.H.,
              M.Kn. Akta ini telah mendapat pengesahan                                                             M.Kn. This deed has been approved by
              dari Kementerian Hukum dan Hak Asasi                                                                 the Minister of Law and Human Rights of
              Manusia      Republik    Indonesia   dengan                                                          the Republic of Indonesia based on Decree
              surat No. AHU-AH.01.09-0090639 tanggal                                                               No.      AHU-AH.01.09-0090639         dated
              20 Desember 2022. Amendemen tersebut                                                                 December 20, 2022. The amendments
              terkait atas persetujuan Perubahan Anggaran                                                          include, among others, the approval of

                                                                                   8
Page 12
                                                                    The original consolidated financial statements included herein are in
                                                                                                               the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                               PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                         AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                           NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                     FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                            AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                   MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                       (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)           (Expressed in full Rupiah amount, unless otherwise stated)

              Dasar Perusahaan untuk menyesuaikan                               Amendments to the Company's Articles of
              dengan Peraturan Otoritas Jasa Keuangan                           Association to conform to the Financial
              (POJK).                                                           Services Authority Regulations (POJK).

              PT Waskita Karya Realty (WKR)                                     PT Waskita Karya Realty (WKR)

              Pendirian WKR (entitas anak) adalah sesuai                        The establishment of WKR (subsidiary) was
              dengan akta notaris No. 27 tanggal                                based on notarial deed No. 27 dated October
              16 Oktober 2014 dari notaris Fathiah Helmi,                       16, 2014 of notary Fathiah Helmi, S.H.
              S.H. Akta pendirian ini telah mendapat                            The deed was approved by the Minister of
              persetujuan oleh Menteri Hukum dan Hak                            Law and Human Rights through the decision
              Asasi Manusia melalui surat keputusan                             letter No. AHU-54929. AH.01.02 dated
              No.      AHU-54929.AH.01.02,        tanggal                       October 23, 2014.
              23 Oktober 2014.
              Anggaran Dasar WKR telah mengalami                                WKR's Articles of Association has been
              beberapa kali perubahan, terakhir dengan akta                     amended for several times, most recently by
              No. 9 tanggal 19 April 2022 dari Vita Cahyojati,                  the notarial deed No. 9 on April 19, 2022 of
              S.H. M.H., Notaris di Jakarta, tentang                            notary Vita Cahyojati, S.H. M.H., about
              pernyataan keputusan para pemegang saham.                         the statement of shareholders decision.
              Akta perubahan ini telah memperoleh                               Which has been approved by the Minister of
              persetujuan dari Menteri Kehakiman dan Hak                        Law and Human Rights through Decision
              Asasi Manusia Republik Indonesia dengan                           Letter No. AHU-AH.01.09-0006747 dated
              Surat Keputusannya No. AHU-AH.01.09-                              April 20, 2022.
              0006747 tanggal 20 April 2022.

              PT Waskita Karya Infrastruktur (WKI)                              PT Waskita Karya Infrastruktur (WKI)

              Pendirian WKI (entitas anak) adalah sesuai                        The establishment of WKI (subsidiary) was
              dengan akta notaris No. 05 tanggal 4 Maret                        based on notarial deed No. 05 dated
              2016 dari notaris Fathiah Helmi S.H. Akta                         March 4, 2016 of notary Fathiah Helmi, S.H.
              pendirian ini telah mendapat persetujuan oleh                     The deed was approved by the Minister of
              Menteri Hukum dan Hak Asasi Manusia                               Law and Human Rights through the decision
              melalui surat keputusan No. AHU-0019486.                          letter No. AHU-0019486.AH.01.01.Tahun
              AH.01.01.Tahun 2016. Anggaran Dasar WKI                           2016. The WKI's Articles of Association has
              telah beberapa kali mengalami perubahan,                          been amended several times, most recently
              terakhir berdasarkan akta notaris No. 109                         by notarial deed No. 109 on February 26,
              tanggal 26 Februari 2019 dari Jose Dima                           2019 of notary Jose Dima Satria, S.H.,
              Satria, SH., M.Kn., yang telah disetujui                          M.Kn., which has been approved by
              oleh Menteri Hukum dan Hak Asasi                                  the Minister of Law and Human Rights
              Manusia        dengan      surat    keputusan                     through the decision letter No. AHU-
              No.      AHU-AH.01.03-0117125          tanggal                    AH.01.03-0117125 dated February 26, 2019.
              26 Februari 2019. Nama Perusahaan berubah                         The Company's name changed to
              menjadi PT Waskita Karya Infrastruktur (WKI)                      PT Waskita Karya Infrastruktur (WKI) based
              berdasarkan akta notaris No. 109 tanggal 26                       on notarial deed No. 109 dated February 26,
              Februari 2019 dari Jose Dima Satria, SH.,                         2019 of notary Jose Dima Satria, S.H.,
              M.Kn., dan telah disetujui oleh Menteri Hukum                     M.Kn., which has been approved by
              dan Hak Asasi Manusia dengan surat                                the Minister of Law and Human Rights
              keputusan No. AHU-0010491.AH.01.02.                               through the decision letter No. AHU-
              Tahun 2019 tanggal 26 Februari 2019.                              0010491.AH.01.02.Tahun       2019     dated
                                                                                February 26, 2019.

              PT Waskita Sangir Energi (WSE)                                    PT Waskita Sangir Energi (WSE)

              Pendirian WSE (kepemilikan tidak langsung                         The establishment of WSE (indirect
              melalui WKI) adalah sesuai dengan akta                            ownership through WKI) was based on
              notaris No. 22 tanggal 11 Juli 2013 dari                          notarial deed No. 22 dated July 11, 2013 of
              notaris Fathiah Helmi, S.H. Akta pendirian ini                    notary Fathiah Helmi, S.H. The deed was
              telah mendapat persetujuan oleh Menteri                           approved by the Minister of Law and Human
              Hukum dan Hak Asasi Manusia melalui surat                         Rights through the decision letter No. AHU-
              keputusan No. AHU-40852.AH.01.01.Tahun                            40852.AH.01.01. Tahun 2013.
              2013.

                                                            9
Page 13
                                                                    The original consolidated financial statements included herein are in
                                                                                                               the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                               PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                         AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                           NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                     FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                            AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                   MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                       (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)           (Expressed in full Rupiah amount, unless otherwise stated)

              Anggaran dasar WSE telah mengalami                                WSE's Articles of Association have been
              beberapa      kali   perubahan,     terakhir                      amended several times, most recently by
              berdasarkan Akta Notaris No. 15 tanggal 21                        Notarial Deed No. 15 dated December 21,
              Desember 2017 dari Kokoh Henry, S.H.,                             2017 by Kokoh Henry, S.H., M.Kn, notary in
              M.Kn., notaris di Jakarta, dalam rangka                           Jakarta, regarding additional issuance of
              penambahan modal Perusahaan. Akta                                 capital of the Company. The above deed was
              tersebut diatas telah diberitahukan kepada                        notified to the Minister of Law and Human
              Menteri Hukum dan Hak Asasi Manusia dan                           Rights and was received pursuant to
              diterima      berdasarkan       Penerimaan                        the Acceptance of Information No. AHU-
              Pemberitahuan No. AHU-AH.01.03-0204677                            AH.01.03-0204677 and registered in Legal
              dan dicatat di dalam Sistem Administrasi                          Entities Administration System of Minister of
              Badan Hukum Kementerian Hukum dan Hak                             Law and Human Rights of the Republic of
              Asasi Manusia Republik Indonesia melalui                          Indonesia through the Company Registration
              Daftar Perseroan No.AHU0164421.AH.01.11.                          No. AHU0164421. AH.01.11.Tahun 2017
              Tahun 2017 tanggal 22 Desember 2017.                              dated December 22, 2017.

              PT Waskita Wado Energi (WWE)                                      PT Waskita Wado Energi (WWE)

              PT Waskita Wado Energi didirikan                                  PT Waskita Wado Energi was established
              berdasarkan akta No. 15 tanggal 19                                based on notarial deed No. 15 dated
              Desember 2016 dari Kokoh Henry, S.H.,                             December 19, 2016 by Kokoh Henry, S.H.,
              M.Kn.,    notaris   di    Jakarta.    Dengan                      M.Kn., notary in Jakarta. With ownership
              kepemilikan saham sebesar 99,95% saham                            interest of 99.95% shares and the rest is
              dan sisanya dimiliki oleh Koperasi Waskita.                       owned by Koperasi Waskita. The Deed of
              Akta pendirian ini disahkan oleh Menteri                          Establishment was approved by the Minister
              Hukum dan Hak Asasi Manusia Republik                              of Law and Human Rights of the Republic of
              Indonesia    dengan      Surat     Keputusan                      Indonesia through the Decision Letter
              No.     AHU-0056418.AH.01.01          tanggal                     No.      AHU-0056418.AH.01.01         dated
              21 Desember 2016 serta diumumkan dalam                            December 21, 2016, and was published in
              Berita    Negara       Republik     Indonesia                     State Gazette of the Republic Indonesia No.
              No. 2364/2017 tanggal 7 Februari 2017,                            2364/2017 dated February 7, 2017,
              Tambahan No. 11.                                                  Supplement No. 11.

              Anggaran Dasar WWE telah beberapa kali                            WWE’s Articles of Association has been
              mengalami perubahan, terakhir berdasarkan                         amended for several times, most recently by
              akta No. 142 tanggal 22 Juli 2019 oleh notaris                    the notarial deed No. 142 on July 22, 2019 of
              Jose Dima Satria, S.H., M.Kn. yang telah                          notary Jose Dima Satria S.H., M.Kn., which
              disetujui oleh Menteri Hukum dan Hak Asasi                        has been approved by the Minister of Law
              Manusia dengan Surat Keputusan No. AHU-                           and Human Rights throught the Decision
              AH.01.03-0306571 tanggal 31 Juli 2019.                            Letter No. AHU-AH.01.03-0306571 dated
              Perubahan yang dimaksud antara lain terkait                       July 31, 2019. Changed referred to between
              perubahan ketentuan Pasal 3 yakni terkait                         others related to changes in provisions of
              maksud dan tujuan serta kegiatan usaha                            Article 3 related to the Company’s purpose
              Perusahaan.                                                       and objectives and the business activities

              PT Trans Jabar Tol (TJT)                                          PT Trans Jabar Tol (TJT)

              Pendirian TJT (kepemilikan tidak langsung                         The establishment of TJT (indirect ownership
              melalui WTR) adalah sesuai dengan akta                            through WTR) was based on notarial deed
              notaris No. 79 tanggal 19 Juli 2007 dari notaris                  No. 79 dated July 19, 2007 of notary
              Humberg Lie, S.H., M.Kn. Akta pendirian ini                       Humberg Lie, S.H., M.Kn. This notarial deed
              telah mendapat persetujuan oleh Menteri                           has been approved by the Minister of Law
              Hukum dan Hak Asasi Manusia melalui                               and Human Rights through the decision
              surat keputusan No. W29-01398-HT.01.01-                           letter No. W29-01398-HT.01.01-TH.2007.
              TH.2007.




                                                            10
Page 14
                                                                  The original consolidated financial statements included herein are in
                                                                                                             the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                             PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                       AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                         NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                   FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                          AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                 MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                     (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)         (Expressed in full Rupiah amount, unless otherwise stated)

              Akuisisi TJT oleh WTR sesuai dengan akta                        Acquisition of TJT by WTR was in
              notaris Jose Dima Satria, S.H., M.Kn No. 44                     accordance with the deed of notary Jose
              tanggal 22 Desember 2015. Akta ini telah                        Dima Satria, S.H., M.Kn No. 44 dated
              mendapat persetujuan oleh Menteri Hukum                         December 22, 2015. This deed was
              dan Hak Asasi Manusia melalui surat                             approved by the Minister of Law and Human
              No. AHU-AH.01.03-0990894.                                       Rights through the decision letter No. AHU-
                                                                              AH.01.03-0990894.

              Anggaran Dasar TJT telah beberapa kali                          TJT's Articles of Association has been
              mengalami perubahan, terakhir berdasarkan                       amended several times, most recently by
              Akta notaris No. 68 tanggal 29 Juli 2020 dari                   notarial deed No. 68 dated July 29, 2020 of
              notaris Febby Rubein Hidayat S.H., yang                         notary Febby Rubein Hidayat, S.H., which
              telah disetujui oleh Menteri Hukum dan Hak                      has been approved by the Minister of Law
              Asasi Manusia dengan Surat Keputusan No.                        and Human Rights through the Decision
              AHU-AH.01.03-0317110 tanggal 29 Juli 2020                       Letter No. AHU-AH. 01.03-0317110 dated
              tentang Penambahan Modal.                                       July 29, 2020 related to additional capital.

              Berdasarkan Keputusan Sirkuler para                             Based on the Circular Decision of
              pemegang saham TJT yang diaktakan melalui                       the shareholders of TJT which was notarized
              Akta      Notaris     No.     39       tanggal                  through Notarial Deed. 39 dated March 16,
              16 Maret 2022 yang dibuat dihadapan H.                          2022, drawn up before H. Feby Rubein
              Feby Rubein Hidayat, S.H., Notaris di Jakarta.                  Hidayat, S.H., Notary in Jakarta. Whereas
              Bahwa WTR selaku pemegang saham                                 WTR as the majority shareholder approved
              mayoritas menyetujui rencana penggunaan                         the     plan     to   use     and    increase
              dan peningkatan modal ditempatkan dan                           the first phase of issued and paid-up capital
              disetor     tahap       pertama       sebesar                   of Rp84,353,000,000 for construction
              Rp84.353.000.000 untuk modal kerja                              working capital, development investment,
              konstruksi, investasi pembangunan, dan                          and retention of toll roads as well as
              retensi ruas tol serta pemenuhan dukungan                       fulfillment of cash deficiency support
              atas kekurangan kas.

              Berdasarkan Keputusan Sirkuler para                             Based on the Circular Decision of
              pemegang saham TJT yang diaktakan melalui                       the shareholders of TJT which was notarized
              Akta Notaris No. 13 tanggal 7 Juni 2022 yang                    through Notarial Deed No. 13 dated June 7,
              dibuat dihadapan H. Feby Rubein Hidayat,                        2022, drawn up before H. Feby Rubein
              S.H., Notaris di Jakarta. Bahwa WTR selaku                      Hidayat, S.H., Notary in Jakarta. Whereas
              pemegang saham mayoritas menyetujui                             WTR as the majority shareholder approved
              rencana penggunaan dan peningkatan modal                        the plan to use and increase the first phase
              ditempatkan dan disetor tahap pertama                           of issued and paid-up capital of
              sebesar Rp6.823.000.000 untuk modal kerja                       Rp6,823,000,000 for construction working
              konstruksi, investasi pembangunan, dan                          capital, development investment, and
              retensi ruas tol serta pemenuhan dukungan                       retention of toll roads as well as fulfillment of
              atas kekurangan kas.                                            cash deficiency support

              Berdasarkan Keputusan Sirkuler para                             Based on the Circular Decision of
              pemegang saham TJT yang diaktakan melalui                       the shareholders of TJT which was notarized
              Akta Notaris No. 48 tanggal 22 Juni 2022 yang                   through Notarial Deed No. 48 dated June 22,
              dibuat dihadapan H. Feby Rubein Hidayat,                        2022, drawn up before H. Feby Rubein
              S.H., Notaris di Jakarta. Bahwa WTR selaku                      Hidayat, S.H., Notary in Jakarta. Whereas
              pemegang saham mayoritas menyetujui                             WTR as the majority shareholder approved
              rencana penggunaan dan peningkatan modal                        the plan to use and increase the first phase
              ditempatkan dan disetor tahap pertama                           of issued and paid-up capital of
              sebesar Rp31.249.000.000 untuk modal kerja                      Rp31,249,000,000 for construction working
              konstruksi, investasi pembangunan, dan                          capital, development investment, and
              retensi ruas tol serta pemenuhan dukungan                       retention of toll roads as well as fulfillment of
              atas kekurangan kas.                                            cash deficiency support.




                                                          11
Page 15
                                                                  The original consolidated financial statements included herein are in
                                                                                                             the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                             PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                       AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                         NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                   FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                          AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                 MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                     (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)         (Expressed in full Rupiah amount, unless otherwise stated)

              Berdasarkan Keputusan Sirkuler para                             Based on the Circular Decision of
              pemegang saham TJT pada tanggal 28 Juni                         the shareholders of TJT on June 28, 2022.
              2022. Bahwa WTR selaku pemegang saham                           That WTR as the majority shareholder
              mayoritas menyetujui rencana penggunaan                         approved the plan to use and increase
              dan peningkatan modal ditempatkan dan                           the issued and paid-up capital for the first
              disetor      tahap    pertama    sebesar                        phase of Rp21,256,000,000 for construction
              Rp21.256.000.000 untuk modal kerja                              working capital, development investment,
              konstruksi, investasi pembangunan, dan                          and retention of toll roads as well as
              retensi ruas tol serta pemenuhan cash                           fulfillment of cash deficiency support.
              deficiency support. Keputusan Sirkuler                          The Circular Decisian was notarized through
              tersebut diaktakan melalui Akta Notaris                         Notarial Deed. 19 dated July 11, 2022, drawn
              No. 19 tanggal 11 Juli 2022 yang dibuat                         up before H. Feby Rubein Hidayat, S.H.,
              dihadapan H. Feby Rubein Hidayat, S.H.,                         Notary in Jakarta.
              Notaris di Jakarta.

              Berdasarkan Keputusan Sirkuler para                             Based on the Circular Decision of
              pemegang saham PT TJT yang diaktakan                            the shareholders of PT TJT which was
              melalui Akta Notaris No. 02 tanggal                             notarized through Notarial Deed No. 02
              2 Agustus 2022 yang dibuat dihadapan H.                         dated August 2, 2022, by H. Feby Rubein
              Feby Rubein Hidayat, S.H., Notaris di Jakarta.                  Hidayat, S.H., Notary in Jakarta. Whereas
              Bahwa Perusahaan selaku pemegang saham                          the Company as the majority shareholder
              mayoritas menyetujui rencana penggunaan                         approved the plan to use and increase
              dan peningkatan modal ditempatkan dan                           the first phase of issued and paid-up capital
              disetor     tahap       pertama       sebesar                   of Rp53,545,000,000 for construction
              Rp53.545.000.000 untuk modal kerja                              working capital, development investment,
              konstruksi, investasi pembangunan, dan                          and retention of toll roads as well as
              retensi ruas tol serta pemenuhan CDS. Akta                      fulfillment of CDS. This Notarial Deed was
              ini telah mendapat persetujuan oleh Menteri                     approved by the Minister of Law and Human
              Hukum dan Hak Asasi Manusia Republik                            Rights through decision letter No. AHU-
              Indonesia melalui surat No. AHU-AH.01.03-                       AH.01.03-0273929 dated August 2, 2022.
              0273929 tanggal 2 Agustus 2022.

              Berdasarkan Keputusan Sirkuler para                             Based on the Circular Decision of
              pemegang saham PT TJT yang diaktakan                            the shareholders of PT TJT which was
              melalui Akta Notaris No. 64 tanggal                             notarized through Notarial Deed No. 64
              30 Agustus 2022 yang dibuat dihadapan H.                        dated August 30, 2022, by H. Feby Rubein
              Feby Rubein Hidayat, S.H., Notaris di Jakarta.                  Hidayat, S.H., Notary in Jakarta. WTR as
              Bahwa Perusahaan selaku pemegang saham                          the      majority    shareholder   approved
              mayoritas menyetujui rencana penggunaan                         the     plan      to  use    and    increase
              dan peningkatan modal ditempatkan dan                           the first phase of issued and paid-up capital
              disetor     tahap       pertama       sebesar                   of Rp34,012,000,000 for construction
              Rp34.012.000.000 untuk modal kerja                              working capital, development investment,
              konstruksi, investasi pembangunan, dan                          and retention of toll roads as well as
              retensi ruas tol serta pemenuhan CDS. Akta                      fulfillment of CDS. This Notarial Deed was
              ini telah mendapat persetujuan oleh Menteri                     approved by the Minister of Law and Human
              Hukum dan Hak Asasi Manusia Republik                            Rights through decision letter No. AHU-
              Indonesia melalui surat No. AHU-AH.01.03-                       AH.01.03-0285183 dated August 30, 2022.
              0285183 tanggal 30 Agustus 2022.

              Berdasarkan Keputusan para pemegang                             Based on the decision of the shareholders
              saham diluar Rapat Umum Pemegang Saham                          outside the Extraordinary General Meeting of
              Luar Biasa PT TJT yang diaktakan melalui                        Shareholders of PT TJT which was notarized
              Akta Notaris No. 48 tanggal 27 September                        through Notarial Deed No. 48 dated
              2022 yang dibuat dihadapan Ir. Nanette                          September 27, 2022 by Ir. Nanette Cahyanie
              Cahyanie Handari Adi Warsito S.H., Notaris di                   Handari Adi Warsito S.H., Notary in Jakarta,
              Jakarta.    Bahwa    Perusahaan      selaku                     WTR as the majority shareholder approved
              pemegang saham mayoritas menyetujui                             the plan to use and increase the issued and
              rencana penggunaan dan peningkatan modal                        paid-up capital of Rp90,776,000,000 for
              ditempatkan     dan    disetor      sebesar                     construction working capital, development
              Rp90.776.000.000 untuk modal kerja                              investment, and retention of toll roads as well
              konstruksi, investasi pembangunan, dan                          as the fulfillment of CDS. This deed has been

                                                          12
Page 16
                                                                  The original consolidated financial statements included herein are in
                                                                                                             the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                             PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                       AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                         NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                   FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                          AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                 MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                     (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)         (Expressed in full Rupiah amount, unless otherwise stated)

              retensi ruas tol serta pemenuhan CDS. Akta                      approved by the Minister of Law and Human
              ini telah mendapat persetujuan oleh Menteri                     Rights of the Republic of Indonesia through
              Hukum dan Hak Asasi Manusia Republik                            letter No. AHU-AH.01.03-0296441 dated
              Indonesia melalui surat No. AHU-AH.01.03-                       September 29, 2022.
              0296441 tanggal 29 September 2022.

              Berdasarkan Keputusan para pemegang                             Based on the decision of the shareholders
              saham diluar Rapat Umum Pemegang Saham                          outside the Extraordinary General Meeting of
              Luar Biasa PT TJT yang diaktakan melalui                        Shareholders of TJT which was notarized
              Akta      Notaris       No.   42    tanggal                     through Notary Deed No. 42 dated October
              24 Oktober 2022 yang dibuat dihadapan                           24, 2022 by Ir. Nanette Cahyanie Handari
              Ir. Nanette Cahyanie Handari Adi Warsito                        Adi Warsito S.H., Notary in Jakarta, WTR as
              S.H., Notaris di Jakarta. Bahwa Perusahaan                      the majority shareholder approved the plan
              selaku     pemegang       saham   mayoritas                     to use and increase the issued and paid-up
              menyetujui rencana penggunaan dan                               capital of Rp44,298,000,000 for construction
              peningkatan modal ditempatkan dan disetor                       working capital, construction investment, and
              sebesar Rp44.298.000.000 untuk modal kerja                      retention of toll roads and fulfillment of CDS.
              konstruksi, investasi pembangunan, dan
              retensi ruas tol serta pemenuhan CDS.

              Berdasarkan Keputusan para pemegang                             Based on the decision of the shareholders
              saham diluar Rapat Umum Pemegang Saham                          outside the Extraordinary General Meeting of
              Luar Biasa PT TJT yang diaktakan melalui                        Shareholders of PT TJT which was notarized
              Akta      Notaris       No.      41  tanggal                    through Notary Deed No. 41 dated 29
              29 November 2022 yang dibuat dihadapan Ir.                      November           2022      made         before
              Nanette Cahyanie Handari Adi Warsito S.H.,                      Ir. Nanette Cahyanie Handari Adi Warsito
              Notaris di Jakarta. Bahwa Perusahaan selaku                     S.H., Notary in Jakarta, WTR as the majority
              pemegang saham mayoritas menyetujui                             shareholder approved the plan to use and
              rencana penggunaan dan peningkatan modal                        increase the issued and paid-up capital of
              ditempatkan        dan      disetor sebesar                     Rp30,018,000,000 for construction working
              Rp30.018.000.000 untuk modal kerja                              capital, construction investment, and
              konstruksi, investasi pembangunan, dan                          retention of toll roads and fulfillment of CDS.
              retensi ruas tol serta pemenuhan CDS.

              Berdasarkan Keputusan Sirkuler para                             Based on the Circular Resolution of
              pemegang saham sebagai pengganti dari                           the shareholders as a substitute for
              Rapat Umum Pemegang Saham Luar Biasa                            the Extraordinary General Meeting of
              PT TJT yang diaktakan melalui Akta Notaris                      Shareholders of PT TJT which was notarized
              No. 47 tanggal 29 Desember 2022 yang                            through Notary Deed No. 47 dated 29
              dibuat dihadapan Ir. Nanette Cahyanie                           December 2022 made before Ir. Nanette
              Handari Adi Warsito, S.H., Notaris di Jakarta.                  Cahyanie Handari Adi Warsito, S.H., Notary
              Bahwa PT TJT selaku pemegang saham                              in Jakarta. Whereas the TJT as the majority
              mayoritas menyetujui rencana penggunaan                         shareholder approved the plan to use and
              dan peningkatan modal ditempatkan dan                           increase the tenth phase of issued and paid-
              disetor     tahap      kesepuluh      sebesar                   up capital of Rp7,748,000,000 for
              Rp7.748.000.000       untuk   modal      kerja                  construction working capital, construction
              konstruksi, investasi pembangunan dan                           investment and toll road retention and
              retensi ruas tol serta pemenuhan CDS. Akta                      fulfillment of CDS. This deed was approved
              ini telah mendapat persetujuan oleh Menteri                     by the Minister of Law and Human Rights of
              Hukum dan Hak Asasi Manusia Republik                            the Republic of Indonesia through
              Indonesia melalui surat No. AHU-AH.01.03-                       letter No. AHU-AH.01.03-0497727 dated
              0497727 tanggal 30 Desember 2022.                               December 30, 2022.

              Berdasarkan Keputusan para pemegang                             Based on the decision of the shareholders
              saham diluar Rapat Umum Pemegang Saham                          outside the Extraordinary General Meeting of
              Luar Biasa PT TJT yang diaktakan melalui                        Shareholders of PT TJT which was notarized
              Akta Notaris No. 34 tanggal 24 Januari 2023                     through Notary Deed No. 34 dated January
              yang dibuat dihadapan Ir. Nanette Cahyanie                      24, 2023 made before Ir. Nanette Cahyanie
              Handari Adi Warsito S.H., Notaris di Jakarta.                   Handari Adi Warsito S.H., Notary in Jakarta.
              Bahwa Perusahaan selaku pemegang saham                          Whereas the Company as the majority
              mayoritas menyetujui rencana penggunaan                         shareholder approved the plan to use and

                                                          13
Page 17
                                                                  The original consolidated financial statements included herein are in
                                                                                                             the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                             PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                       AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                         NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                   FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                          AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                 MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                     (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)         (Expressed in full Rupiah amount, unless otherwise stated)

              dan peningkatan modal ditempatkan dan                           increase the issued and paid-up capital of
              disetor sebesar Rp19.168.000.000 untuk                          IDR 19,168,000,000 for construction working
              modal     kerja  konstruksi,   investasi                        capital, construction investment, and
              pembangunan, dan retensi ruas tol serta                         retention of toll roads and fulfillment of CDS.
              pemenuhan CDS.

              Berdasarkan Keputusan sirkuler para                             Based on the circular decision of the
              pemegang saham diluar Rapat Umum                                shareholders outside the Extraordinary
              Pemegang Saham Luar Biasa TJT tanggal 26                        General Meeting of Shareholders of TJT
              Juni 2023, bahwa Perusahaan selaku                              dated 26 June 2023, that the Company as
              pemegang saham mayoritas menyetujui                             the majority shareholder approved the plan
              rencana penggunaan dan peningkatan modal                        to use and increase the issued and paid up
              ditempatkan       dan     disetor  sebesar                      capital       of          Rp178,622,000,000.
              Rp178.622.000.000 untuk modal kerja                             For     construction       working   capital,
              konstruksi, investasi pembangunan, dan                          development investment, and retention of toll
              retensi ruas tol serta pemenuhan CDS.                           roads as well as fulfillment of CDS.

              Berdasarkan Keputusan sirkuler para                             Based on the circular decision of the
              pemegang saham diluar Rapat Umum                                shareholders outside the TJT Extraordinary
              Pemegang Saham Luar Biasa TJT yang                              General Meeting of Shareholders which was
              diaktakan melalui Akta Notaris No. 30 tanggal                   notarized through Notarial Deed No. 30
              27 Juni 2023 yang dibuat dihadapan H. Feby                      dated 27 June 2023 which was made before
              Rubein Hidayat, S.H, Notaris di Jakarta dan                     H. Feby Rubein Hidayat, S.H, Notary in
              telah mendapat pengesahan dari Menteri                          Jakarta and has been approved by
              Hukum dan Hak Asasi Manusia Republik                            the Minister of Law and Human Rights of
              Indonesia, dengan surat keputusan No. AHU-                      the Republic of Indonesia, by decree no.
              AH.01.03-0085141 tanggal 28 Juni 2023,                          AHU-AH.01.03-0085141 dated 28 June
              bahwa Perusahaan selaku pemegang saham                          2023, that the Company as the majority
              mayoritas menyetujui rencana penggunaan                         shareholder approved the plan to use and
              dan peningkatan modal ditempatkan dan                           increase the issued and paid-up capital of
              disetor sebesar Rp23.717.000.000 untuk                          Rp23,717,000,000 for construction working
              modal      kerja    konstruksi,     investasi                   capital, development investment, and
              pembangunan, dan retensi ruas tol serta                         retention of toll roads and fulfillment of CDS
              pemenuhan CDS.

              PT Pemalang Batang Tol Road (PBTR)                              PT Pemalang Batang Tol Road (PBTR)

              Pendirian PBTR, (kepemilikan tidak langsung                     The establishment of PBTR, (indirect
              melalui WTR) adalah sesuai dengan akta                          ownership through WTR) was based on
              notaris No. 10 tanggal 15 Juni 2006 dari                        notarial deed No. 10 dated June 15, 2006 of
              notaris Bonardo Nasution S.H. Akta pendirian                    notary Bonardo Nasution, S.H. The deed
              ini telah mendapat persetujuan dari Menteri                     was approved by the Minister of Law and
              Hukum dan Hak Asasi Manusia melalui surat                       Human Rights through the decision letter
              keputusan No. C-20478 HT.01.01.Tahun                            No. C-20478 HT.01.01.Tahun 2006 dated
              2006 tanggal 13 Juli 2006.                                      July 13, 2006.

              Selanjutnya peralihan pemegang saham                            The change in ownership of PBTR to WTR
              PBTR ke dalam WTR berdasarkan akta                              was based on notarial deed No. 57 dated
              notaris No. 57 tanggal 15 Februari 2016 dari                    February 15, 2016 of notary Jose Dima
              notaris Jose Dima Satria S.H., M.Kn. Akta ini                   Satria S.H., M.Kn. The deed was approved
              telah mendapat persetujuan oleh Menteri                         by Minister of Law and Human Rights
              Hukum dan Hak Asasi Manusia melalui surat                       through     the   decision   letter  No.
              keputusan No. AHU-AH.01.03-0982070.                             AHU-AH.01.03-0982070.

              Anggaran Dasar PBTR telah beberapa kali                         PBTR's Articles of Association has been
              mengalami perubahan, terakhir berdasarkan                       amended several times, most recently by
              akta    notaris   No.      46     tanggal                       notarial deed No. 46 on December 21, 2018
              21 Desember 2018 dari notaris Catur Virgo                       of notary Catur Virgo, S.H., M.H., which has
              S.H., M.H., yang telah disetujui oleh                           been approved by the Minister of Law and
              Menteri Hukum dan Hak Asasi Manusia                             Human Rights through the Decision Letter
              dengan Surat Keputusan No. AHU-

                                                          14
Page 18
                                                                  The original consolidated financial statements included herein are in
                                                                                                             the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                             PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                       AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                         NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                   FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                          AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                 MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                     (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)         (Expressed in full Rupiah amount, unless otherwise stated)

              0177882.AH.01.11.Tahun        2018     tanggal                  No. AHU-0177882.AH.01.11.Tahun 2018
              27 Desember 2018.                                               dated December 27, 2018.

              PT Waskita Sriwijaya Tol (WST)                                  PT Waskita Sriwijaya Tol (WST)

             Pendirian WST (kepemilikan tidak langsung                        The establishment of WST (indirect
             melalui WTR) adalah sesuai dengan akta                           ownership through WTR) was based on
             notaris No. 51 tanggal 18 November 2011 dari                     notarial deed No. 51 dated November 18,
             notaris Ilmiawan Dekrit Supatmo S.H., M.H.                       2011 of notary Ilmiawan Dekrit Supatmo
             Akta pendirian ini telah mendapat pengesahan                     S.H., M.H. This notarial deed was
             Menteri Hukum dan Hak Asasi Manusia                              approved by the Minister of Law and Human
             sesuai dengan Surat Keputusan No. AHU-                           Rights through the decision letter No. AHU-
             56876.A.H.01.01.Tahun 2011 tanggal 21                            56876.A.H.01.01. Tahun 2011, dated
             November 2011.                                                   November 21, 2011.

             Akuisisi WST oleh WTR berdasarkan akta                           The acquisition of WST by WTR is based on
             notaris No. 26 dan No. 27 tanggal 12 Mei 2016                    notarial deed No. 26 and No. 27 dated
             dari notaris Fathiah Helmi, S.H.                                 May 12, 2016 of notary Fathiah Helmi, S.H.

             Berdasarkan akta notaris No. 51 tanggal                          Based on notarial deed No. 51 dated April
             27 April 2017 dari notaris Fathiah Helmi S.H.,                   27, 2017 by notary Fathiah Helmi S.H., WTR
             WTR membeli saham milik PT Persada                               purchased the shares owned by PT Persada
             Tanjung Api-Api sebesar Rp146.250.000.000                        Tanjung Api – Api amounting to
             atau sebesar        29,25%,     saham milik                      Rp146,250,000,000 or equivalent to 29.25%,
             PT       Kayson        Company        sebesar                    shares owned by PT Kayson Company
             Rp23.750.000.000 atau sebesar 4,75% dan                          amounting      to   Rp23,750,000,000     or
             saham milik PT Sriwijaya Marga Persada                           equivalent to 4.75% and shares owned by PT
             sebesar Rp20.000.000.000 atau sebesar 4%,                        Sriwijaya Marga Persada amounting to
             sehingga penyertaan WTR meningkat menjadi                        Rp20,000,000,000 or equivalent to 4%,
             75,57%.                                                          which increased the WTR’s ownership to
                                                                              75.57%.

             Berdasarkan akta notaris No. 11 tanggal                          Based on the notarial deed No. 11 dated
             8 Juni 2018 dari notaris Catur Virgo, S.H.,                      June 8, 2018 of notary Catur Virgo S.H.,
             M.H., kepemilikan WTR di WST berubah                             M.H., the ownership of WTR in WST
             menjadi    Rp112.700.000.000      sehingga                       increased to Rp112,700,000,000 which
             penyertaan Perusahaan meningkat menjadi                          increased the WTR’s ownership to 98.99%.
             98,99%.

             Berdasarkan akta notaris No. 49 tanggal                          Based on notarial deed No. 49 dated
             21 Desember 2018 dibuat oleh notaris Catur                       December 21, 2018 made by notary Catur
             Virgo, S.H.,M.H berkedudukan di Jakarta                          Virgo, S.H., M.H based in West Jakarta and
             Barat dan mendapatkan pengesahan dari                            approved by the Minister of Law and Human
             Menteri Hukum dan Hak Asasi Manusia                              Rights through the Decision Letter No. AHU-
             melalui Surat Keputusan No. AHU-                                 0000072.AH.01.02 dated January 2, 2019,
             0000072.AH.01.02 tanggal 2 Januari 2019                          the name of PT Sriwijaya Markmore Persada
             mengenai perubahan nama PT Sriwijaya                             was changed into PT Waskita Sriwijaya Tol
             Markmore Persada menjadi PT Waskita                              abbreviated as WST.
             Sriwijaya Tol disingkat WST.

              Anggaran Dasar WST telah beberapa kali                          WST's Articles of Association has been
              mengalami perubahan, terakhir berdasarkan                       amended several times, most recently by
              akta notaris No. 35 tanggal 24 September                        notarial deed No. 35 dated September 24,
              2019 dari notaris Catur Virgo S.H., M.H., yang                  2019 of notary Catur Virgo, S.H., M.H.,
              telah disetujui oleh Menteri Hukum dan Hak                      which      has     been     approved    by
              Asasi Manusia dengan Surat Keputusan                            the Minister of Law and Human Rights
              No.       AHU-0074036.AH.01.02Tahun2019                         through        the      Decision     Letter
              tanggal 24 September 2019.                                      No. AHU-0074036.AH. 01.02Tahun2019
                                                                              dated September 24, 2019.



                                                          15
Page 19
                                                                  The original consolidated financial statements included herein are in
                                                                                                             the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                             PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                       AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                         NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                   FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                          AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                 MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                     (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)         (Expressed in full Rupiah amount, unless otherwise stated)

              Berdasarkan Keputusan Sirkular Rapat                            Based on the Circular Decision of
              Umum Pemegang Saham (RUPS) tanggal                              the General Meeting of Shareholders (GMS)
              7 Maret 2022, WTR menambah penyertaan                           dated March 7, 2022, WTR increased
              pada WST sebesar Rp1.551.340.000.000.                           its   investment   in    WST     amounting
              WST telah melakukan peningkatan modal                           to    Rp1,551,340,000,000.     WST    has
              dasar    dari     sebelumnya   sebesar                          increased     its     authorized    capital
              Rp1.000.000.000.000    menjadi sebesar                          from         Rp1,000,000,000,000         to
              Rp6.000.000.000.000.                                            Rp6,000,000,000,000.

              Berdasarkan Keputusan Sirkuler para                             Based on the Circular Decision of
              pemegang saham WST yang diaktakan                               the shareholders of WST which was
              melalui Akta Notaris No. 15 tanggal 7 Maret                     notarized through Notarial Deed. 15 dated
              2022 yang dibuat dihadapan Ir. Nanette C.H.                     March 7, 2022 made before Ir. Nanette C.H.
              Adi Warsito, S.H., Notaris di Jakarta. Bahwa                    Adi Warsito, S.H., Notary in Jakarta, WTR,
              WTR selaku pemegang saham mayoritas                             as the majority shareholder approved
              menyetujui rencana penggunaan dan                               the plan to use and increase the issued and
              peningkatan    modal      ditempatkan    dan                    paid-up capital for the first phase of
              disetor     tahap      pertama        sebesar                   Rp1,551,340,000,000 for the construction
              Rp1.551.340.000.000      untuk     kebutuhan                    needs of the toll road owned by WST.
              pembangunan jalan tol milik WST.

              Berdasarkan Keputusan Sirkuler para                             Based on the Circular Decision of
              pemegang saham PT WST yang diaktakan                            the shareholders of PT WST which is
              melalui Akta Notaris No. 40 tanggal                             notarized through Notarial Deed. 40 dated
              20 Oktober 2022 yang dibuat dihadapan                           October 20, 2022 by Ir. Nanette C.H. Adi
              Ir. Nanette C.H. Adi Warsito, S.H., Notaris di                  Warsito, S.H., Notary in Jakarta, WTR as
              Jakarta.    Bahwa     Perusahaan       selaku                   the majority shareholder approved the plan
              pemegang saham mayoritas menyetujui                             to use and increase the issued and paid-up
              rencana penggunaan dan peningkatan modal                        capital for the second phase of
              ditempatkan dan disetor tahap kedua sebesar                     Rp716,732,000,000 for the construction
              Rp716.732.000.000       untuk      kebutuhan                    needs of PT WST's toll road. This deed has
              pembangunan jalan tol milik PT WST. Akta ini                    been approved by the Minister of Law and
              telah mendapat persetujuan oleh Menteri                         Human Rights of the Republic of Indonesia
              Hukum dan Hak Asasi Manusia Republik                            through letter No. AHU-AH.01.03-0305312
              Indonesia melalui surat No. AHU-AH.01.03-                       October 24, 2022.
              0305312 tanggal 24 Oktober 2022.

              Berdasarkan Keputusan para pemegang                             Based on the decision of the shareholders
              saham diluar Rapat Umum Pemegang Saham                          outside the Extraordinary General Meeting of
              Luar Biasa PT WST yang diaktakan melalui                        Shareholders of PT WST which was
              Akta Notaris No. 22 tanggal 7 Februari 2023                     notarized through Notary Deed No. 22 dated
              yang dibuat dihadapan Ir. Nanette Cahyanie                      7 February 2023 made before Ir. Nanette
              Handari Adi Warsito S.H., Notaris di Jakarta.                   Cahyanie Handari Adi Warsito S.H., Notary
              Bahwa Perusahaan selaku pemegang saham                          in Jakarta. Whereas the Company as
              mayoritas menyetujui rencana penggunaan                         the majority shareholder approved the plan
              dan peningkatan modal ditempatkan dan                           to use and increase the issued and paid-up
              disetor sebesar Rp462.619.000.000. Akta ini                     capital of Rp.462,619,000,000. This deed
              telah mendapat persetujuan oleh Menteri                         was approved by the Minister of Law and
              Hukum dan Hak Asasi Manusia Republik                            Human Rights of the Republic of Indonesia
              Indonesia melalui surat No. AHU-AH.01.03-                       through letter No. AHU-AH.01.03-0024406
              0024406 tanggal 10 Februari 2023.                               dated 10 February 2023.

              PT Waskita Bumi Wira (WBW)                                      PT Waskita Bumi Wira (WBW)

              WBW (kepemilikan tidak langsung melalui                         WBW (indirect ownership through WTR) was
              WTR) didirikan berdasarkan Akta No. 48                          established based on Deed No. 48 dated
              tanggal 20 Agustus 2014 oleh Jose Dima                          August 20, 2014 by Jose Dima Satria, S.H.,
              Satria, S.H., M.Kn., Notaris di Jakarta, dan                    M.Kn., Notary in Jakarta, and has been
              telah medapatkan pengesahan dari Menteri                        approved by the Minister of Law
              Hukum dan dan Hak Asasi Manusia                                 and Human Rights through decision
              sesuai     dengan      Surat      Keputusan                     letter No. AHU-22261.40.10.2014, dated
              tanggal 28 Agustus 2014 No. AHU-                                August 28, 2014.
              22261.40.10.2014.


                                                          16
Page 20
                                                                  The original consolidated financial statements included herein are in
                                                                                                             the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                             PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                       AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                         NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                   FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                          AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                 MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                     (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)         (Expressed in full Rupiah amount, unless otherwise stated)

              WTR memiliki penyertaan sebesar 48% atas                        WTR had an initial ownership interest of 48%
              modal disetor WBW (kepemilikan tidak                            on the paid up capital of WBW (indirect
              langsung melalui WTR) atau sebesar                              ownership through WTR) amounting to
              Rp7.500.000.000, berdasarkan akta notaris                       Rp7,500,000,000, based on the notarial
              Jose Dima Satria, S.H., M. Kn. No. 43                           deed of Jose Dima Satria, S.H., M. Kn. No.
              tanggal 28 Oktober 2014.                                        43 dated October 28, 2014.

              Pada tanggal 9 Mei 2016, berdasarkan                            On May 9, 2016, based on the Decree of
              Keputusan Sirkular Rapat Umum Pemegang                          the Circular Resolution of General Meeting
              Saham (RUPS) tangal 3 Mei 2016, WTR                             of Shareholders (RUPS) dated May 3, 2016,
              membeli saham milik PT Energi Bumi Mining                       WTR bought the shares owned by
              sebesar    Rp1.094.000.000,     sehingga                        PT Energi Bumi Mining amounting to
              penyertaan Perusahaan meningkat menjadi                         Rp1,094,000,000, which increased WTR’s
              55%.                                                            ownership to 55%.

              Berdasarkan akta notaris No. 5 tanggal                          Based on notarial deed No. 5 dated April 4,
              4 April 2016, PT Energi Bumi Mining memiliki                    2016, PT Energi Bumi Mining has share
              opsi saham untuk membeli kembali transfer                       option to buy back the 7% ownership
              kepemilikan 7% dari WBW sampai dengan                           transfered to WBW until December 31, 2016.
              31 Desember 2016. Opsi saham tersebut                           The share option expired and WBW was
              berakhir dan WBW dikonsolidasi WTR.                             consolidated by WTR.

              Berdasarkan akta notaris No. 13 tanggal                         Based on the notarial deed No. 13 dated
              8 Desember 2017 dari notaris Zulkifli Harahap                   December 8, 2017, by notary Zulkifli
              S.H., Modal Dasar WBW yang sebelumnya                           Harahap S.H., the authorized capital of WBW
              berjumlah 50.000 lembar saham menjadi                           changed from 50,000 shares to 1,000,000
              1.000.000 lembar saham dan peningkatan                          shares and the issued and fully capital paid
              modal      ditempatkan      dan        disetor                  increased   from     Rp7,500,000,000         to
              yang semula Rp7.500.000.000 menjadi                             Rp554,957,000,000 which increased WTR’s
              Rp554.957.000.000 sehingga penyertaan                           ownership to 76.06%. This deed was
              WTR meningkat menjadi 76,06%. Akta ini                          approved by the Ministry of Law and Human
              telah mendapat pengesahan dari Menteri                          Rights through the          decision     letter
              Hukum dan Hak Asasi Manusia, dengan Surat                       No. AHU-0156761.        AH.01.11        dated
              Keputusan No.       AHU-0156761.AH.01.11                        December 11, 2017.
              tanggal 11 Desember 2017.

             Berdasarkan surat keterangan notaris Zulkifli                    Based on the letter of notary Zulkifli Harahap
             Harahap S.H., No. 364/NZH/PT/II/2018 tanggal                     S.H., No. 364/NZH/PT/II/2018 dated
             1 Februari 2018 sehubungan dengan Rapat                          February 1, 2018 in connection with
             Umum Pemegang Saham Luar Biasa                                   the Extraordinary General Shareholders
             (RUPSLB), WTR menambah penyertaan pada                           Meeting (RUPSLB), WTR made additional
             WBW sebesar Rp826.718.000.000. Perubahan                         investment in WBW amounting to
             ini telah disahkan sesuai dengan akta notaris                    Rp826,718,000,000. This amendment has
             Zulkifli Harahap, S.H No. 10 tanggal 9 Februari                  been ratified in accordance with notarial
             2018.                                                            deed of Zulkifli Harahap, S.H No. 10 dated
                                                                              February 9, 2018.

             Berdasarkan Akta No. 2 tanggal 4 Mei 2018                        Based on Deed No. 2 dated May 4, 2018 by
             dari Zulkifli Harahap S.H., penyertaan                           Zulkifli Harahap S.H., WTR increased its
             Perusahaan meningkat menjadi 99,90%. Akta                        participation to 99.90%. This Deed was
             ini telah mendapat pengesahan dari Menteri                       approved by Ministry of Justice and Human
             Hukum dan Hak Asasi Manusia, dengan Surat                        Rights through decision letter No. AHU-
             Keputusan     No.   AHU-AH.01.03-0179800                         AH.01.03-0179800 dated May 7, 2018.
             tanggal 7 Mei 2018.

             Anggaran Dasar WBW telah beberapa kali                           WBW's Articles of Association has been
             diubah, dan perubahan terakhir dilakukan                         amended several times, most recently by
             berdasarkan Akta No. 63 tanggal 29 Agustus                       Deed No. 63 dated August 29, 2019 of
             2019 yang dibuat dihadapan Ashoya Ratam                          Ashoya Ratam S.H., M.Kn., Notary in
             S.H., M.Kn., Notaris di Jakarta, mengenai                        Jakarta, regarding changes in the address of
             perubahan alamat WBW dan perubahan                               WBW and changes to Article 3 of the Articles
             Pasal 3 Anggaran Dasar yaitu maksud dan                          of Association, namely the purposes and
             tujuan serta kegiatan usaha Perusahaan dan                       objectives and business activities of the
             telah mendapat pengesahan dari Menteri                           Company and was approved by the Minister

                                                          17
Page 21
                                                                  The original consolidated financial statements included herein are in
                                                                                                             the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                             PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                       AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                         NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                   FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                          AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                 MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                     (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)         (Expressed in full Rupiah amount, unless otherwise stated)

             Hukum dan Hak Asasi Manusia dengan Surat                         of Law and Human Rights through the
             Keputusan     No.   AHU-AH.01.03-0326920                         Decision Letter No. AHU-AH.01.03-0326920
             tanggal 5 September 2019.                                        dated September 5, 2019.

             Berdasarkan Keputusan para pemegang                              Based on the decision of the shareholders
             saham diluar Rapat Umum Pemegang Saham                           outside the Extraordinary General Meeting of
             Luar Biasa WBW yang diaktakan melalui Akta                       Shareholders of WBW which was notarized
             Notaris No. 55 tanggal 30 Maret 2022 yang                        through Notarial Deed. 55 dated March 30,
             dibuat dihadapan Ir. Nanette Cahyanie                            2022 drawn up before Ir. Nanette Cahyanie
             Handari Adi Warsito S.H., Notaris di Jakarta.                    Handari Adi Warsito S.H., Notary in Jakarta.
             Bahwa WTR selaku pemegang saham                                  Whereas WTR as the majority shareholder
             mayoritas menyetujui rencana penggunaan                          approved the plan to use and increase
             dan peningkatan modal ditempatkan dan                            the    issued      and     paid-up   capital
             disetor sebesar Rp26.591.000.000 yang akan                       of Rp26,591,000,000 which will be
             digunakan untuk pendanaan Investasi dan                          used for investment funding and Cash
             Cash Deficiency Support (CDS). WBW telah                         Deficiency Support (CDS). WBW has
             melakukan peningkatan modal dasar dari                           increased      its     authorized    capital
             sebelumnya sebesar Rp3.500.000.000.000                           from         Rp3,500,000,000,000          to
             menjadi sebesar Rp4.046.371.000.000.                             Rp4,046,371,000,000.

             Berdasarkan Keputusan para pemegang                              Based on the decision of the shareholders
             saham diluar Rapat Umum Pemegang Saham                           outside the Extraordinary General Meeting of
             Luar Biasa WBW yang diaktakan melalui Akta                       Shareholders of WBW which was notarized
             Notaris No. 42 tanggal 14 April 2022 yang                        through Notarial Deed. 42 dated April 14,
             dibuat dihadapan Ir. Nanette Cahyanie                            2022 drawn up before Ir. Nanette Cahyanie
             Handari Adi Warsito S.H., Notaris di Jakarta.                    Handari Adi Warsito S.H., Notary in Jakarta.
             Bahwa WTR selaku pemegang saham                                  Whereas WTR as the majority shareholder
             mayoritas menyetujui rencana penggunaan                          approved the plan to use and increase
             dan peningkatan modal ditempatkan dan                            the issued and paid-up capital of
             disetor sebesar Rp258.924.000.000 yang                           Rp258,924,000,000 which will be used for
             akan digunakan untuk pembangunan jalan tol                       the construction of the Krian – Legundi –
             Krian – Legundi – Bunder – Manyar.                               Bunder – Manyar toll road.

             Berdasarkan Keputusan para pemegang                              Based on the decision of the shareholders
             saham diluar Rapat Umum Pemegang Saham                           outside the Extraordinary General Meeting of
             Luar Biasa WBW yang diaktakan melalui Akta                       Shareholders of WBW which was notarized
             Notaris No. 15 tanggal 17 Mei 2022 yang                          through Notarial Deed. 15 dated May 17,
             dibuat dihadapan Ir. Nanette Cahyanie                            2022 drawn up before Ir. Nanette Cahyanie
             Handari Adi Warsito S.H., Notaris di Jakarta.                    Handari Adi Warsito S.H., Notary in Jakarta,
             Bahwa WTR selaku pemegang saham                                  WTR, as the majority shareholder approved
             mayoritas menyetujui rencana penggunaan                          the plan to use and increase the issued and
             dan peningkatan modal ditempatkan dan                            paid-up capital of Rp62,308,000,000 which
             disetor sebesar Rp62.308.000.000 yang akan                       will be used for the construction of the Krian
             digunakan untuk pembangunan jalan tol Krian                      – Legundi – Bunder – Manyar toll road.
             – Legundi – Bunder – Manyar.

             Berdasarkan Keputusan para pemegang                              Based on the decision of the shareholders
             saham diluar Rapat Umum Pemegang Saham                           outside the Extraordinary General Meeting of
             Luar Biasa WBW yang diaktakan melalui Akta                       Shareholders of WBW which was notarized
             Notaris No. 69 tanggal 21 Juli 2022 yang dari                    through Notarial Deed No. 69 dated July 21,
             notaris Ir. Nanette Cahyanie Handari Adi                         2022 by Notary Ir. Nanette Cahyanie Handari
             Warsito S.H., Notaris di Jakarta. Bahwa WTR                      Adi Warsito S.H., Notary in Jakarta, WTR, as
             selaku     pemegang       saham     mayoritas                    the     majority    shareholder     approved
             menyetujui peningkatan modal ditempatkan                         the increase in issued and paid-up capital of
             dan disetor sebesar Rp22.000.000.000 yang                        Rp22,000,000,000 which will be used for
             akan digunakan untuk Cash Deficiency                             Cash Deficiency Support (CDS).
             Support (CDS).

              Berdasarkan Keputusan Sirkuler para                             Based on the Circular Decision of
              pemegang saham WBW tanggal 29 Juli 2022,                        the shareholders of WBW dated July 29,
              WTR meningkatkan modal ditempatkan dan                          2022, WTR increased its issued and paid-up
              disetor    kepada   WBW        sebesar                          capital   in    WBW       amounting      to


                                                          18
Page 22
                                                                  The original consolidated financial statements included herein are in
                                                                                                             the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                             PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                       AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                         NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                   FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                          AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                 MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                     (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)         (Expressed in full Rupiah amount, unless otherwise stated)

              Rp62.600.000.000 atau sebanyak 62.600                           Rp62,600,000,000 or equivalent to 62,600
              lembar saham.                                                   shares.

              Berdasarkan Keputusan Sirkuler para                             Based     on      the    Circular   Decision
              pemegang      saham      WBW       tanggal                      of the shareholders of WBW dated
              2 September 2022, WTR meningkatkan                              Sepember 2, 2022, WTR increased its
              modal ditempatkan dan disetor kepada WBW                        issued and paid-up capital to WBW
              sebesar Rp38.150.000.000 atau sebanyak                          amounting      to     Rp38,150,000,000    or
              38.150 lembar saham.                                            equivalent to 38,150 shares.

              Berdasarkan Keputusan Sirkuler para                             Based on the Circular Decision of
              pemegang      saham      WBW       tanggal                      the shareholders of WBW dated Sepember
              28 September 2022, WTR meningkatkan                             28, 2022, WTR increased its issued and
              modal ditempatkan dan disetor kepada WBW                        paid-up capital to WBW amounting to
              sebesar Rp35.262.000.000 atau sebanyak                          Rp35,262,000,000     or  equivalent  to
              35.262 lembar saham.                                            35,262 shares.

             Berdasarkan Keputusan Sirkuler para                              Based on the Circular Decision of
             pemegang       saham     WBW       tanggal                       the shareholders of WBW dated Sepember
             28 September 2022, WTR meningkatkan                              28, 2022, WTR increased its issued and
             modal ditempatkan dan disetor kepada WBW                         paid-up capital in WBW amounting to
             sebesar Rp69.713.000.000 atau sebanyak                           Rp69,713,000,000 or equivalent to 69,713
             69.713 lembar saham.                                             shares.

             Berdasarkan Keputusan para pemegang                              Based on the decision of the shareholders
             saham diluar Rapat Umum Pemegang Saham                           outside the Extraordinary General Meeting of
             Luar Biasa PT WBW yang diaktakan melalui                         Shareholders of WBW which was notarized
             Akta Notaris No. 20 tanggal 13 Oktober 2022                      through Notarial Deed No. 20 dated Oktober
             yang dibuat dihadapan Ir. Nanette Cahyanie                       13, 2022 by Ir. Nanette Cahyanie Handari
             Handari Adi Warsito S.H., Notaris di Jakarta.                    Adi Warsito S.H., Notary in Jakarta, WTR, as
             Bahwa PT Waskita Toll Road (WTR) selaku                          the majority shareholder approved the plan
             pemegang saham mayoritas menyetujui                              to use and increase of issued and paid-up
             rencana penggunaan dan peningkatan modal                         capital of Rp69,713,000,000 which will be
             ditempatkan      dan     disetor      sebesar                    used for the construction of the Krian –
             Rp69.713.000.000 yang akan digunakan                             Legundi – Bunder – Manyar toll road.
             untuk      pembangunan          jalan      tol                   deed      has     been       approved     by
             Krian – Legundi – Bunder – Manyar. Akta ini                      the Minister of Law and Human Rights of
             telah mendapat persetujuan oleh Menteri                          the Republic of Indonesia through
             Hukum dan Hak Asasi Manusia Republik                             letter No. AHU-AH.01.03-0302666 dated
             Indonesia melalui surat No. AHU-AH.01.03-                        October 15, 2022.
             0302666 tanggal 15 Oktober 2022.

             Berdasarkan Keputusan para pemegang                              Based on the decision of the shareholders
             saham diluar Rapat Umum Pemegang Saham                           outside the Extraordinary General Meeting of
             Luar Biasa WBW yang diaktakan melalui Akta                       Shareholders of WBW which was notarized
             Notaris No. 40 tanggal 29 November 2022                          through Notary Deed No. 40 dated
             yang dibuat dihadapan Ir. Nanette Cahyanie                       November 29, 2022 by Ir. Nanette Cahyanie
             Handari Adi Warsito S.H., Notaris di Jakarta.                    Handari Adi Warsito S.H., Notary in Jakarta,
             Bahwa WTR selaku pemegang saham                                  WTR, as the majority shareholder approved
             mayoritas menyetujui rencana penggunaan                          the plan to use and increase the issued and
             dan peningkatan modal ditempatkan dan                            paid-up capital of Rp38,061,000,000 which
             disetor sebesar Rp38.061.000.000 yang akan                       will be used for the construction of the Krian
             digunakan untuk pembangunan jalan tol Krian                      - Legundi - Bunder - Manyar toll road. This
             – Legundi – Bunder – Manyar. Akta ini telah                      deed was approved by the Minister of Law
             mendapat persetujuan oleh Menteri Hukum                          and Human Rights of the Republic of
             dan Hak Asasi Manusia Republik Indonesia                         Indonesia through letter No. AHU-AH.01.03-
             melalui surat No. AHU-AH.01.03-0320042                           0320042 dated December 1, 2022.
             tanggal 1 Desember 2022.

             Berdasarkan Keputusan para pemegang                              Based on the decision of the shareholders
             saham diluar Rapat Umum Pemegang Saham                           outside the Extraordinary General Meeting of

                                                          19
Page 23
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

             Luar Biasa WBW yang diaktakan melalui Akta                        Shareholders of WBW which was notarized
             Notaris No. 20 tanggal 14 Desember 2022                           through Notary Deed No. 20 dated
             yang dibuat dihadapan Ir. Nanette Cahyanie                        December 14, 2022 by Ir. Nanette Cahyanie
             Handari Adi Warsito S.H., Notaris di Jakarta.                     Handari Adi Warsito S.H., Notary in Jakarta,
             Bahwa WTR selaku pemegang saham                                   WTR, as the majority shareholder approved
             mayoritas menyetujui rencana peningkatan                          the plan to increase the issued and paid-up
             modal ditempatkan dan disetor sebesar                             capital of Rp75,343,000,000 which will be
             Rp75.343.000.000 yang akan digunakan                              used for the construction of the Krian -
             untuk pembangunan jalan tol Krian – Legundi                       Legundi - Bunder - Manyar toll road.
             – Bunder – Manyar. Akta ini telah mendapat                        This deed was approved by the Minister of
             persetujuan oleh Menteri Hukum dan Hak                            Law and Human Rights of the Republic of
             Asasi Manusia Republik Indonesia melalui                          Indonesia through letter No. AHU-AH.01.03-
             surat No. AHU-AH.01.03-0327095 tanggal 16                         0327095 dated December 16, 2022.
             Desember 2022.

             Berdasarkan Keputusan para pemegang                               Based on the decision of the shareholders
             saham diluar Rapat Umum Pemegang Saham                            outside the Extraordinary General Meeting of
             Luar Biasa WBW yang diaktakan melalui Akta                        Shareholders of WBW which was notarized
             Notaris No. 48 tanggal 29 Desember 2022                           through Notary Deed No. 48 dated
             yang dibuat dihadapan Ir. Nanette Cahyanie                        December 29, 2022 by Ir. Nanette Cahyanie
             Handari Adi Warsito S.H., Notaris di Jakarta.                     Handari Adi Warsito S.H., Notary in Jakarta,
             Bahwa WTR selaku pemegang saham                                   WTR, as the majority shareholder approved
             mayoritas menyetujui rencana peningkatan                          the plan to increase the issued and paid-up
             modal ditempatkan dan disetor sebesar                             capital of Rp129,950,000,000 which will be
             Rp129.950.000.000 yang akan digunakan                             used for the construction of the Krian -
             untuk pembangunan jalan tol Krian – Legundi                       Legundi - Bunder - Manyar toll road.
             – Bunder – Manyar. Akta ini telah mendapat                        This deed was approved by the Minister of
             persetujuan oleh Menteri Hukum dan Hak                            Law and Human Rights of the Republic of
             Asasi Manusia Republik Indonesia melalui                          Indonesia through letter No. AHU-AH.01.03-
             surat No. AHU-AH.01.03-0497730 tanggal 30                         0497730 dated December 30, 2022.
             Desember 2022.

              PT Tol Teluk Balikpapan (TTB)                                    PT Tol Teluk Balikpapan (TTB)

              Pendirian TTB (kepemilikan tidak langsung                        The establishment of TTB (indirect ownership
              melalui WTR) adalah sesuai dengan akta                           through WTR) was based on notarial deed
              notaris No. 42 tanggal 16 September                              No. 42 dated September 16, 2016 of notary
              2016 dari notaris Yeti Liana, S.Psi., S.H.,                      Yeti Liana, S. Psi., S.H., M.Kn. The deed of
              M.Kn. Akta pendirian ini telah mendapat                          establishment was approved by the Minister of
              persetujuan oleh Menteri Hukum dan                               Law and Human Rights through the decision
              Hak     Asasi   Manusia    melalui    surat                      letter   dated     September     21,   2016
              keputusan tanggal 21 September 2016                              No. AHU-0041732.AH.01.01.Tahun 2016.
              No. AHU-0041732.AH.01.01.Tahun 2016.                             WTR, a subsidiary, holds a 60% interest in
              WTR, entitas anak, memiliki penyertaan                           TTB or equivalent to Rp12,000,000,000.
              sebesar 60% pada TTB atau setara
              Rp12.000.000.000.

              Anggaran Dasar Perusahaan telah beberapa                         TTB Articles of Association has been
              kali    mengalami      perubahan,      terakhir                  amended several times, most recently by the
              berdasarkan akta notaris No. 27 tanggal                          notarial deed No. 27 dated September 18,
              18 September 2019 dari notaris Ir. Nanette                       2019 of Ir. Nanette C.H. Adi Warsito, S.H.,
              C.H. Adi Warsito, S.H., yang telah disetujui                     which      has       been      approved      by
              oleh Menteri Hukum dan Hak Asasi Manusia                         the Minister of Law and Human Rights through
              dengan Surat Keputusan No. AHU-0072820.                          the Decision Letter No. AHU-0072
              AH.01.02.Tahun 2019 tanggal 20 September                         820.AH.01.02.Tahun 2019 dated September
              2019. Perubahan yang dimaksud antara lain                        20, 2019. The changes referred to
              terkait perubahan ketentuan Pasal 3 ayat 2                       amongothers related to changes in
              yakni terkait maksud dan tujuan serta kegiatan                   the provisions of Article 3 paragraph 2 related
              usaha Perusahaan.                                                to the TTB's purpose and objectives and
                                                                               business activities.




                                                           20
Page 24
                                                                  The original consolidated financial statements included herein are in
                                                                                                             the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                             PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                       AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                         NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                   FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                          AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                 MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                     (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)         (Expressed in full Rupiah amount, unless otherwise stated)

              PT Waskita Transjawa Toll Road (WTTR)                           PT Waskita Transjawa Toll Road (WTTR)

              Pendirian PT Waskita MNC Transjawa Toll                         The establishment of PT Waskita MNC
              Road (kepemilikan tidak langsung melalui                        Transjawa Toll Road (indirect ownership
              WTR) adalah sesuai dengan akta notaris                          through WTR) was based on notarial deed
              Fathiah Helmi, S.H., No. 25 tanggal                             No. 25 dated September 28, 2015 of notary
              28 September 2015. Akta pendirian ini telah                     Fathiah Helmi, S.H. This notarial deed has
              mendapat pengesahan Menteri Hukum dan                           been approved by The Minister of Law
              Hak Asasi Manusia sesuai dengan Surat                           and Human Rights through decision letter
              Keputusan No. AHU-2458481.AH.01.01.                             No. AHU-2458481.AH.01.01. TH.2015 dated
              TH.2015 tanggal 29 September 2015.                              September 29, 2015.

              Berdasarkan akta notaris Catur Virgo, S.H.,                     Based on notarial deed Catur Virgo, S.H.,
              M.H., No. 32 tanggal 27 Mei 2016 telah                          M.H., No. 32 dated May 27, 2016 changed
              disetujui perubahan nama dari “PT Waskita                       the name of “PT Waskita MNC Transjawa
              MNC Transjawa Toll Road” menjadi                                Toll Road” into “PT Waskita Transjawa Toll
              “PT Waskita Transjawa Toll Road”. Akta                          Road”. The deed was approved by
              tersebut telah disahkan oleh Menteri Hukum                      the Minister of Law and Human Rights
              dan Hak Asasi Manusia dalam surat                               through decision letter No. AHU-AH.01.03-
              keputusan No. AHU-AH.01.03-005.3.001                            005.3.001 dated May 31, 2016.
              tanggal 31 Mei 2016.

              Berdasarkan akta notaris No. 23 tanggal                         Based on notarial deed No. 23 dated April
              10 April 2018 oleh Ir. Nanette Cahyanie                         10, 2018 by Ir. Nanette Cahyanie Handari
              Handari Adi Warsito, S.H., WTR menjual                          Adi Warsito, S.H., WTR sold its 57.14%
              57,14% kepemilikan saham di WTTR dengan                         ownership    WTTR     at    a   price  of
              harga     sebesar      Rp2.857.143.347.539.                     Rp2,857,143,347,539 to Limited Investment
              Kepemilikan saham WTR di WTTR menjadi                           Fund (RDPT). WTR’s share ownership in
              sebesar 42,85% setelah penjualan tersebut.                      WTTR became 42.85% after the sale of
              Akta tersebut telah disahkan oleh Menteri                       transaction. The deed was approved by
              Hukum dan Hak Asasi Manusia dalam Surat                          the Minister of Law and Human Rights
              Keputusan No.        AHU-0050658.AH.01.11                       through    decision  letter   No.    AHU-
              tanggal 11 April 2018.                                          0050658.AH.01.11 dated April 11, 2018.

              Berdasarkan akta notaris No. 26 tanggal                         Based on notarial deed No. 26 dated April
              11 April 2018 oleh Ir. Nanette Cahyanie                         11, 2018 by Ir. Nanette Cahyanie Handari
              Handari Adi Warsito, S.H., kepemilikan                          Adi Warsito, S.H., WTR’s share ownership in
              saham WTR di WTTR menjadi sebesar                               WTTR became 29.99%. The deed was
              29,99%. Akta tersebut telah disahkan oleh                       approved by the Minister of Law and Human
              Menteri Hukum dan Hak Asasi Manusia                             Rights through decision letter No. AHU-
              dalam Surat Keputusan No. AHU-AH.01.03-                         AH.01.03-0144385 dated April 12, 2018.
              0144385 tanggal 12 April 2018.

              WTR melakukan Put Option atas Kepemilikan                       WTR performed a Put Option on Shares
              saham di WTTR sebesar 4,75%, sesuai                             Ownership in WTTR of 4.75%, based on
              dengan Perjanjian Antar Pemegang Saham                          shareholders agreement No. 25 dated April
              No. 25 tanggal 10 April 2018 Pasal 6.3 perihal                  10, 2018 Article 6.3 regarding the transfer of
              Pengalihan Saham – Put Option dan Call                          shares – Put Option and Call Option
              Option     sebesar       Rp420.070.567.530,                     amounting to Rp420,070,567,530, thereby
              kepemilikan saham WTR di WTTR menjadi                           WTR’s share ownership in WTTR became
              sebesar 34,75%.                                                 34.75%.

              WTR melakukan Put Option Tahun II atas                          WTR performed a Put Option Tahun II on
              Kepemilikan saham di WTTR sebesar 4,75%,                        Shares Ownership in WTTR of 4.75%, based
              sesuai dengan Akta Notaris No. 01 tanggal 1                     on Notarial Deed No. 1 dated April 1, 2020 of
              April 2020 dari Notaris Ir. Nanette C.H. Adi                    Notary Ir. Nanette C.H. Adi Warsito, S.H.
              Warsito, S.H. sebesar Rp467.433.619.437,                        amounting to Rp467,433,619,437, WTR’s
              kepemilikan saham WTR di WTTR menjadi                           share ownership in WTTR became 39.10%.
              sebesar 39,10%.

              Berdasarkan Dokumen Berita Acara Rapat                          Based on the Minutes of the General Meeting
              Umum Pemegang Unit Penyertaan Terbatas                          of the Holders of the Trans Java
              Ekuitas Danareksa Infrastruktur Trans Jawa                      Infrastructure Limited Equity Participation
              No. 89 tanggal 27 Juli 2022, Group                              Unit No. 89 dated July 27, 2022, the Group


                                                          21
Page 25
                                                                  The original consolidated financial statements included herein are in
                                                                                                             the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                             PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                       AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                         NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                   FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                          AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                 MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                     (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)         (Expressed in full Rupiah amount, unless otherwise stated)

              melakukan pelunasan secara bertahap                             paid off the unit ownership in stages
              kepemilikan           unit      sebesar                         amounting to Rp5,256,112,000,000 or
              Rp5.256.112.000.000 atau setara dengan                          equivalent to 80.2% share ownership of
              80,2% kepemilikan saham RDPT di WTTR                            RDPT in WTTR which was implemented on
              yang dilaksanakan pada 30 Agustus 2022.                         August 30, 2022. On this basis,
              atas    dasar    tersebut,  WTR    telah                        WTR has controlled the WTTR which was
              mengendalikan     WTTR     yang  semula                         previously controlled by the RDPT.
              dikendalikan oleh RDPT. Sehingga WTTR                           Accordingly WTTR is consolidated as of
              terkonsolidasi per 31 Agustus 2022.                             August 31, 2022. WTR will buy the remaining
              Perusahaan akan membeli sisa unit                               RDPT participation units when it has
              penyertaan RDPT apabila sudah memiliki                          available funds.
              ketersediaan dana.
              Berdasarkan pernyataan keputusan para                           Based on the statement of decisions of
              pemegang saham diluar Rapat Umum                                the shareholders outside the Extraordinary
              Pemegang Saham Luar Biasa PT Waskita                            General Meeting of Shareholders of
              Toll Road yang diaktakan melalui Akta Notaris                   PT Waskita Toll Road which was notarized
              No 60 tanggal 26 Agustus 2022 yang dibuat                       through Deed No. 60 dated 26 August 2022
              dihadapan Ir. Nanette Cahyanie Handari Adi                      made before Ir. Nanette Cahyanie Handari
              Warsito, S.H., Notaris di Jakarta. Bahwa para                   Adi Warsito, S.H., Notary in Jakarta.
              pemegang saham menyetujui tindakan WTR                          Whereas the shareholders agreed to
              untuk melaksanakan Call Option saham                            the WTR's action to carry out the Call Option
              RDPT di PT WTTR melalui mekanisme                               for RDPT shares in PT WTTR through
              pembelian unit penyertaan dengan harga                          the mechanism of purchasing an investment
              sebesar    Rp6.546.570.473.856.       Dengan                    unit at a price of Rp6,546,570,473,856.
              demikian, kepemilikan WTR di WTTR                               Accordingly, WTR’s ownership in WTTR
              meningkat menjadi sebesar 88,08%.                               increased to 88.08%.

              PT Transjawa Paspro Jalan Tol (TJPJT)                           PT Transjawa Paspro Jalan Tol (TJPJT)

              Pendirian TJPJT (kepemilikan tidak langsung                     The establishment of TJPJT (indirect
              melalui WTR) sesuai dengan Akta Notaris No.                     ownership through WTR) was based on
              22 tanggal 21 Mei 2007 oleh Humberg Lie,                        Notarial Deed No.22 dated May 21, 2007 by
              S.H., M.Kn., Akta pendirian ini telah mendapat                  Humberg Lie, S.H, M.Kn., The Deed of
              persetujuan oleh Menteri Hukum dan Hak                          established was approved by the Minister of
              Asasi Manusia melalui Surat Keputusan No.                       Law and Human Rights through Decision
              W29-01201HT.01.01-TH.2007.                                      Letter No. W29-01201HT.01.01-TH.2007.
              Akuisisi dari TPJT oleh WTTR sesuai dengan                      Acquisition of TPJT by WTTR is in
              akta notaris No. 135 tanggal 28 September                       accordance with the deed No. 135 of
              2015 dari notaris Humberg Lie, S.H., M.Kn.                      September 28, 2015 of notary Humberg Lie,
              Akta ini telah mendapat persetujuan oleh                        S.H., M.Kn. This deed was approved by
              Menteri Hukum dan Hak Asasi Manusia                             The Minister of Law and Human
              melalui No. AHU-AH.01.03-0969717.                               Rightsthrough its letter No. AHU - AH.01.03-
                                                                              0969717.
              Perjanjian Pengusahaan Jalan Tol ruas                           The Concession Agreements for Pasuruan -
              Pasuruan - Probolinggo telah mengalami                          Probolinggo Toll Road have been amended,
              perubahan, berdasarkan Akta Notaris No. 8                       by notarial deed No. 8 dated February 18,
              tanggal 18 Februari 2020 oleh Rina Utami                        2020 by Rina Utami Djauhari S.H., notary in
              Djauhari S.H., notaris di Jakarta, terdapat                     Jakarta, the concession period for Pasuruan
              perubahan masa konsesi atas ruas tol                            – Probolinggo toll road becomes 50 years,
              Pasuruan – Probolinggo menjadi 50 tahun,                        most recent by Notarial Deed No. 16 dated
              terakhir berdasarkan Akta Notaris No. 16                        June 18, 2021 by Rina Utami Djauhari S.H.,
              tanggal 18 Juni 2021 oleh Rina Utami                            Notary in Jakarta. In the most recent
              Djauhari S.H., Notaris di Jakarta. Pada                         amendment, the principal payment period for
              perubahan terakhirnya, masa pembayaran                          land acquisition by the Company for
              pokok dana pengadaan tanah oleh                                 the Pasuruan - Probolinggo toll road was
              Perusahaan atas ruas tol Pasuruan -                             adjusted because it passed the time limit
              Probolinggo disesuaikan karena telah                            determined by the previous Toll Road
              melewati batasan waktu yang ditentukan oleh                     Concession Agreement.
              Perjanjian    Pengusahaan      Jalan    Tol
              sebelumnya.

                                                          22
Page 26
                                                                  The original consolidated financial statements included herein are in
                                                                                                             the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                             PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                       AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                         NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                   FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                          AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                 MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                     (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)         (Expressed in full Rupiah amount, unless otherwise stated)

              PT Waskita Fim Perkasa Realti (WFPR)                            PT Waskita Fim Perkasa Realti (WFPR)

              Pendirian WFPR (kepemilikan tidak langsung                      The establishment of WFPR (indirect
              melalui WKR) adalah sesuai dengan akta                          ownership through WKR) was based on
              notaris No. 122 tanggal 31 Mei 2018 dari                        notarial deed No. 122 dated May 31, 2018 of
              notaris Rosida Rajagukguk Siregar. Akta                         notary Rosida Rajagukguk Siregar. The deed
              pendirian ini telah mendapat persetujuan oleh                   of establishment was approved by
              Menteri Hukum dan Hak Asasi Manusia                             the Minister of Law and Human Rights
              melalui surat keputusan tanggal 31 Mei 2018                     through decision letter dated May 31, 2018
              No. AHU-0075663.AH.01.11.Tahun 2018.                            No. AHU-0075663.AH.01.11.Tahun 2018.

              Anggaran dasar WFPR telah mengalami                             The WFPR’s Articles of Association have
              beberapa kali perubahan, terakhir dengan                        been amended several times, most recently
              akta No. 223 tanggal 22 September 2022 dari                     by Notarial Deed No. 223 dated September
              Rosida Rajagukguk Siregar, S.H., M.Kn.,                         22, 2022 of Rosida Rajagukguk Siregar,
              Notaris di Jakarta tentang pernyataan                           S.H., M.Kn., public Notary in Jakarta,
              keputusan sirkuler Rapat Umum Pemegang                          regarding the circular decision statement of
              Saham. Akta perubahan ini telah memperoleh                      the General Meeting of Shareholders.
              persetujuan dari Menteri Kehakiman dan Hak                      This amendment was acknowledged by
              Asasi Manusia Republik Indonesia dengan                         the Ministry of Law and Human Rights of
              Surat Keputusannya No. AHU-AH.01.09-                            the Republic of Indonesia in its Decision
              0058201 tanggal 23 September 2022.                              Letter No. AHU- AH.01.09-0058201 dated
                                                                              September 23, 2022.

              PT Waskita Modern Realti (WMR)                                  PT Waskita Modern Realti (WMR)

              Pendirian WMR (kepemilikan tidak langsung                       The establishment of WMR (indirect
              melalui WKR) adalah sesuai dengan akta                          ownership through WKR) was based on
              notaris No. 7 tanggal 17 Mei 2018 dari notaris                  notarial deed No. 7 dated May 17, 2018 of
              Dewi Tenti Septi Artiany S.H., M.H., M.Kn.                      notary Dewi Tenti Septi Artiany S.H., M.H.,
              Akta pendirian ini telah mendapat persetujuan                   M.Kn. The deed of establishment was
              oleh Menteri Hukum dan Hak Asasi Manusia                        approved by the Minister of Law and Human
              melalui surat keputusan tanggal 17 Mei 2018                     Rights through the decision letter dated May
              No. AHU-0069024.AH.01.11.Tahun 2018.                            17, 2018 No. AHU-0069024. AH.01.11.
                                                                              Tahun 2018.

              Anggaran dasar WMR telah mengalami                              The WMR’s Articles of Association have
              beberapa kali perubahan, terakhir dengan                        been amended several times, most recently
              akta No. 475 tanggal 31 Mei 2022 dari Tiara                     by Notarial Deed No. 475 dated May 31,
              Vita, S.H., M.Kn. Notaris di Kota Bekasi                        2022 of Tiara VIta, S.H., M.Kn. public Notary
              tentang persetujuan anggota Direksi dan                         in Bekasi, regarding the approval of
              Komisaris. Akta perubahan ini telah                             the members of the Board of Directors and
              memperoleh persetujuan dari Menteri                             Commissioners. This amendment was
              Kehakiman dan Hak Asasi Manusia Republik                        acknowledged by the Ministry of Law and
              Indonesia dengan Surat Keputusannya No.                         Human Rights of the Republic of Indonesia
              AHU-AH.01.09-0019573 tanggal 8 Juni 2022.                       in its Decision Letter No. AHU-AH.01.09-
                                                                              0019573 dated June 8, 2022.

              Perusahaan dan entitas anak selanjutnya                         The Company and its subsidiaries
              secara bersama-sama disebut sebagai                             hereinafter will be referred as “the Group”.
              “Grup”.

   c.   Penawaran Umum Efek Grup                                  c.    The Public Offering of the Group's Securities

        Saham                                                           Shares

        Pada tanggal 10 Desember 2012, Perusahaan                       On December 10, 2012, the Company’s obtained
        memperoleh pernyataan efektif dari Ketua Badan                  an effective statement from the Chairman of
        Pengawas Pasar Modal dan Lembaga Keuangan                       the Capital Market and Financial Institution
        (Bapepam-LK) berdasarkan surat keputusan No.                    Supervisory Agency (Bapepam-LK) through
        S-14012/BL/2012.                                                the decision letter No. S-14012/ BL/2012.

                                                          23
Page 27
                                                                  The original consolidated financial statements included herein are in
                                                                                                             the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                             PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                       AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                         NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                   FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                          AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                 MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                     (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)         (Expressed in full Rupiah amount, unless otherwise stated)

        Pada tanggal 17 Desember 2012 berdasarkan                      On December 17, 2012, according to letter
        surat No. S-08414/BEI.PPJ/12-2012 Bursa Efek                   No. S-08414/BEI.PPJ/12-2012, Indonesian Stock
        Indonesia (BEI) menyetujui penawaran efek                      Exchange (IDX) agreed to the public offering of
        Perusahaan di BEI kepada masyarakat atas                       the Company on IDX for 3,082,315,000 of
        3.082.315.000 saham biasa dengan nilai nominal                 common stock with the par value Rp100 per share
        Rp100 per saham dan harga penawaran Rp380 per                  and the offering price Rp380 per share.
        saham.

        Dari jumlah saham yang ditawarkan dalam                        From the number of shares offered in the public
        penawaran umum kepada masyarakat sebesar                       offering of 6.25% or 192,644,000 of new ordinary
        6,25% atau sebanyak 192.644.000 saham biasa                    shares is allocated to the employees through
        atas nama baru dijatahkan kepada karyawan                      the allocation shares program of the Company
        Perusahaan melalui program penjatahan saham                    (Employee Stock Allocation/ ESA).
        untuk pegawai Perusahaan (Employee Stock
        Allocation/ ESA).

        Pada tanggal 19 Desember 2012, seluruh saham                   On December 19, 2012, a total of 9,632,236,000
        Perusahaan sebanyak 9.632.236.000 saham telah                  shares of the Company were listed on the IDX. On
        tercatat pada BEI. Pada tanggal 10 Juni 2015,                  June 10, 2015, the Company obtained an effective
        Perusahaan memperoleh pernyataan efektif dari                  statement from The Board of Commissioners
        Dewan Komisioner Otoritas Jasa Keuangan (OJK)                  of the Financial Services Authority (OJK)
        atas Pernyataan Pendaftaran dalam rangka                       of the Registration Statement in the Limited Public
        Penawaran Umum Terbatas I (PUT I) berdasarkan                  Offering I (LPO I) through the decision letter No. S-
        surat keputusan No. S-238/D.04/2015.                           238/D.04/2015.

        Pada tanggal 7 Juli 2015, seluruh saham                         On July 7, 2015, all the Company’s shares through
        Perusahaan     melalui   PUT    I   sebanyak                    the LPO I amounting to 3,653,498,200 shares that
        3.653.498.200 saham telah tercatat pada BEI,                    have been listed in the IDX, bringing the number of
        sehingga jumlah keseluruhan saham Perusahaan                    shares of the Company after the LPO I amounting
        setelah PUT I menjadi sebesar 13.567.473.560                    to 13,567,473,560 shares.
        saham.

        Pada tanggal 16 Desember 2021, Perusahaan                       On December 16, 2021, the Company obtained an
        memperoleh pernyataan efektif dari Dewan                        effective statement from the Board of
        Komisioner Otoritas Jasa Keuangan (OJK) atas                    Commissioners of the Financial Services Authority
        Pernyataan Pendaftaran dalam rangka Penawaran                   (OJK) on the Registration Statement for the Limited
        Umum Terbatas II (PUT II) Kepada Para                           Public      Offering     II    (LPO       II)    to
        Pemegang Saham Perusahaam Dalam Rangka                          the Shareholders of the Company for the Pre-
        Hak Memesan Edek Terlebih Dahulu (HMETD)                        emptive Rights Order (HMETD) based on decision
        berdasarkan           surat          keputusan                  letter No. S-236/D.04/2021.
        No. S-236/D.04/2021.

        Pada tanggal 30 Desember 2021, jumlah                           As of December 30, 2021, the total number of
        keseluruhan saham Perusahaan setelah hasil                      shares of the Company after the results of
        pelaksanaan Hak Memesan Efek Terlebih Dahulu                    the exercise of the Pre-emptive Rights shares and
        bagian dan disetor oleh Negara Republik Indonesia               is paid up by the Republic of Indonesia amounting
        menjadi sebesar 26.315.886.475 saham.                           to 26,315,886,475 shares.

        Pada tanggal 6 Januari 2022, jumlah keseluruhan                 As of January 6, 2022, the total number of shares
        saham Perusahaan setelah hasil pelaksanaan Hak                  of the Company after the results of the exercise of
        Memesan Efek Terlebih Dahulu bagian dan disetor                 the Pre-emptive Rights shares and is paid up by
        oleh Masyarakat menjadi sebesar 28.806.807.016                  Public amounting to 28,806,807,016 shares.
        saham.

        Obligasi dan Sukuk                                              Bonds and Sukuk

        Perusahaan telah menerbitkan obligasi dengan                    The company has issued bonds for working capital
        tujuan untuk dana kerja dan pengembangan jalan                  and toll road development. The bonds are listed on
        tol. Obligasi dicatatkan di BEI dengan rincian                  the IDX with the following details:
        sebagai berikut:


                                                          24
Page 28
                                                                                                                              The original consolidated financial statements included herein are in
                                                                                                                                                                         the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                                                                    PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                                                                              AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                                                NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                                                                          FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                                                                 AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                                                                        MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                                                                            (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                                                                     (Expressed in full Rupiah amount, unless otherwise stated)

                                Obligasi/                    Amount             Tahun/         Tanggal Penerbitan/                         Jatuh Tempo/                                                          Wali Amanat/
            No                   Bonds                         Rp               Years           Date of Issuance                             Due Date                                    Status                   Trustee
            1    Berkelanjutan II Tahap III Seri B/
                 Shelf II Phase III Tranche B              910.000.000.000          5      21 Februari/ February 21, 2017          21 Februari/ February 21, 2022       Lunas/ Settled                     PT Bank Mega Tbk
            2    Berkelanjutan III Tahap I Seri B/
                 Shelf III Phase I Tranche B              1.631.000.000.000         5        6 Oktober/ October 6, 2017              06 Oktober/ October 6, 2022        Lunas/ Settled                     PT Bank Mega Tbk
            3    Berkelanjutan III Tahap II Seri B/
                 Shelf III Phase II Tranche B             2.276.500.000.000         5      23 Februari/ February 23, 2018              16 Juni/ June 16, 2023           Sudah Jatuh Tempo/ Expired         PT Bank Mega Tbk
            4    Berkelanjutan III Tahap III Seri B/
                 Shelf III Phase III Tranche B             941.750.000.000          5    28 September/ September 28, 2018        28 September/ September 28, 2023       Belum Jatuh Tempo/ Outstanding     PT Bank Mega Tbk
            5    Berkelanjutan III Tahap IV Seri A/
                 Shelf III Phase IV Tranche A              484.000.000.000          3          16 Mei/ May 16, 2019                     16 Mei/ May 16, 2022            Lunas/ Settled                     PT Bank Mega Tbk
            6    Berkelanjutan III Tahap IV Seri B/
                 Shelf III Phase IV Tranche B             1.361.750.000.000         5          16 Mei/ May 16, 2019                     16 Mei/ May 16, 2024            Belum Jatuh Tempo/ Outstanding     PT Bank Mega Tbk
            7    Berkelanjutan IV Tahap I/
                 Shelf IV Phase I                          135.500.000.000          3        6 Agustus/ August 6, 2020                6 Agustus/ August 6, 2023         Belum Jatuh Tempo/ Outstanding     PT Bank Mega Tbk
            8    Obligasi III Seri A/
                 Bond III Tranche A                        722.000.000.000          5    24 September/ September 24, 2021        24 September/ September 24, 2026       Belum Jatuh Tempo/ Outstanding     PT Bank Mega Tbk
            9    Obligasi III Seri B/
                 Bond III Tranche B                       1.051.000.000.000         7    24 September/ September 24, 2021        24 September/ September 24, 2028       Belum Jatuh Tempo/ Outstanding     PT Bank Mega Tbk
            10   Obligasi IV Seri A/
                 Bond IV Tranche A                         658.000.000.000          5          12 Mei/ May 12, 2022                     12 Mei/ May 12, 2027            Belum Jatuh Tempo/ Outstanding     PT Bank KB Bukopin Tbk
            11   Obligasi IV Seri B/
                 Bond IV Tanche B                         1.469.300.000.000         7          12 Mei/ May 12, 2022                     12 Mei/ May 12, 2029            Belum Jatuh Tempo/ Outstanding     PT Bank KB Bukopin Tbk




        WBP telah menerbitkan obligasi dengan rincian                                                                               WBP has issued bonds with the following details
        sebagai berikut:                                                                                                            are as follows:
                                                          Jumlah/
                            Obligasi/                     Amount           Tahun/           Tanggal Penerbitan/                         Jatuh Tempo/                                                          Wali Amanat/
       No                      Bonds                         Rp               Years           Date of Issuance                             Due Date                                 Status                      Trustee

                                                                                                                                   Sesuai Ketentuan Skema
       1     Berkelanjutan I Tahap I/                   500.000.000.000         3             5 Juli/ July 5, 2019            Perdamaian/According to the terms of   Direstrukturisasi/ Restructured     PT Bank Mega Tbk
                                                                                                                                   the reconciliation scheme
             Shelf I Phase I
                                                                                                                                   Sesuai Ketentuan Skema
       2     Berkelanjutan I Tahap II/                 1.500.000.000.000                                                      Perdamaian/According to the terms of   Direstrukturisasi/ Restructured     PT Bank Mega Tbk
                                                                                3        30 Oktober/ October 30, 2019              the reconciliation scheme
             Shelf I Phase II


       Berdasarkan Perjanjian Perdamaian yang                                                                                     Based on the Reconciliation Agreement stipulated
       ditetapkan dalam Surat Pengadilan Negeri Jakarta                                                                           in the Special Class IA Central Jakarta District
       Pusat       Kelas       IA      Khusus        No                                                                           Court No. W10.U1.2868.Ht.03.VI. 2022.RIN dated
       W10.U1.2868.Ht.03.VI.2022.RIN tanggal 30 Juni                                                                              June 30, 2022 regarding Notification and
       2022 perihal Pemberitahuan dan Penyampaian                                                                                 Submission of Copies of Commercial Case
       Salinan    Penetapan      Perkara   Niaga     No                                                                           Determination No. 497/Pdt.Sus/PKPU/2021/PN.
       497/Pdt.Sus/PKPU/2021/ PN.Niaga.Jkt.Pst, telah                                                                             Niaga.Jkt.Pst, special provisions for restructuring
       ditetapkan ketentuan khusus restrukturisasi untuk                                                                          have been set for bondholders, whereby the total
       pemegang obligasi, dimana jumlah utang Kreditur                                                                            debt to the Bondholder Creditors will be paid
       Pemegang Obligasi yang akan dibayarkan melalui                                                                             through the Tranche B class, which is 15%
       golongan Tranche B adalah sebesar 15% dari total                                                                           of the total portion of the debts to the Bondholder
       porsi utang Kreditur Pemegang Obligasi (“Utang                                                                             Creditors ("Tranche B debts to the Bondholder
       Tranche B Kreditur Pemegang Obligasi”),                                                                                    Creditors"), the settlement of the Tranche B Debt
       Kewajiban dari Perseroan atas penyelesaian atas                                                                            to the Bondholders Creditors will be made
       Utang Tranche B Kreditur Pemegang Obligasi                                                                                 on the 5th year from the Effective Date and will be
       akan dilakukan pada tahun ke-5 sejak tanggal                                                                               settled by the Company on the 6th year from the
       Berlaku dan akan diselesaikan oleh Perseroan                                                                               Effective Date which will be sourced from Cash
       pada tahun ke-6 sejak tanggal berlaku yang akan                                                                            Flow Available for Debt Services (CFADS).
       bersumber dari Cash Flow Available for Debt                                                                                Tranche B Debt to Bondholders will bear an
       Services (CFADS). Atas Utang Tranche B Kreditur                                                                            interest     of     2%     per     annum     during
       Pemegang Obligasi akan diberikan bunga sebesar                                                                             the implementation of this Reconciliation
       2% per-tahun selama pelaksanaan Perjanjian                                                                                 Agreement which will be paid in accordance with
       Perdamaian ini yang akan dibayarkan sesuai                                                                                 CFADS and the remaining portion of the total debt
       dengan CFADS dan sisa total utang akan                                                                                     will be settled through Tranche C.
       diselesaikan melalui Tranche C.




                                                                                                          25
Page 29
                                                                                                      The original consolidated financial statements included herein are in
                                                                                                                                                 the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                                                 PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                                                           AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                                                       FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                                              AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                                                     MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                                                         (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                                             (Expressed in full Rupiah amount, unless otherwise stated)

       Perusahaan      telah    menerbitkan sukuk                                                        The Company has issued sukuk mudharabah for
       mudharabah dengan tujuan untuk dana kerja                                                         working capital and toll road development with
       dengan rincian sebagai berikut:                                                                   the following details:
                                             Jumlah/
                         Sukuk/              Amount           Tahun/     Tanggal Penerbitan/                  Jatuh Tempo/                                              Wali Amanat/
        No               Sukuk                 Rp             Years       Date of Issuance                      Due Date                       Status                    Trustee

         1   Sukuk Mudharabah I Seri A/     383.000.000.000     5        12 Mei/ May 12, 2022              12 Mei/ May 12, 2027   Belum Jatuh Tempo/ Outstanding   PT Bank KB Bukopin Tbk
             Sukuk Mudharabah I Tranche A
         2   Sukuk Mudharabah I Seri B/     765.100.000.000     7      12 Mei 2022/ May 12, 2022           12 Mei/ May 12, 2029   Belum Jatuh Tempo/ Outstanding   PT Bank KB Bukopin Tbk
             Sukuk Mudharabah I Tranche B


  d.   Bidang Usaha                                                                                 d.   The Scope of Business

       Sesuai dengan pasal 3 Anggaran Dasar                                                              In accordance with article 3 of the Company’s
       Perusahaan, maksud dan tujuan Perusahaan                                                          Articles     of    Association,     the    objectives
       adalah melakukan usaha di bidang industri                                                         of the Company are to conduct business in
       konstruksi, industri pabrikasi, jasa penyewaan,                                                   construction industry, manufacturing industry,
       jasa keagenan, investasi, agro industri, pekerjaan                                                leasing service, agency services, investment, agro
       terintegrasi (Engineering, Procurement and                                                        industry,      integrated    work       (Engineering,
       Construction: EPC), perdagangan, pengelolaan                                                      Procurement and Construction: EPC), trade, area
       kawasan, layanan jasa peningkatan kemampuan                                                       management, construction improvement services,
       di bidang konstruksi, teknologi informasi serta                                                   information technology and tourism as well as
       kepariwisataan serta optimalisasi pemanfaatan                                                     optimizing the utilization of resources owned by
       sumber daya yang dimiliki Perusahaan untuk                                                        the Company to produce high quality and strong
       menghasilkan barang dan/atau jasa yang bermutu                                                    competitive goods and/or services to gain/pursue
       tinggi dan berdaya saing kuat, untuk                                                              profit to increase the Company's value by applying
       mendapat/mengejar          keuntungan        guna                                                 the principles of Limited Liability Company.
       meningkatkan      nilai   Perusahaan       dengan
       menerapkan prinsip-prinsip Perseroan Terbatas.

       Untuk mencapai maksud dan tujuan tersebut di                                                      In order to achieve these objectives, the Company
       atas, Perusahaan dapat melaksanakan kegiatan                                                      engaged in activities such as Construction
       usaha yaitu Pekerjaan pelaksanaan konstruksi,                                                     execution work, mining services, integrated EPC,
       jasa pertambangan, pekerjaan terintegrasi EPC,                                                    design and build, building management, building
       rancang bangun, manajemen gedung, pabrikasi                                                       components and raw material fabrication,
       bahan dan komponen bangunan, pabrikasi                                                            component and construction tools fabrication,
       komponen dan peralatan konstruksi, pabrikasi                                                      metals, woods, rubber, and plastic fabrication,
       barang logam, kayu, karet dan plastik, penyewaan                                                  agency services for raw materials, building
       peralatan konstruksi, layanan jasa keagenan                                                       components       and construction       equipment,
       bahan dan komponen bangunan serta peralatan                                                       investment and/or business management in area
       konstruksi, investasi dan/atau pengelolaan usaha                                                  of basic facility and infrastructure and industry,
       di bidang prasarana dan sarana dasar serta                                                        export-import,     general     trading,     system
       industri, ekspor-impor, perdagangan umum,                                                         development, area management, and property
       system development, pengelolaan kawasan, dan                                                      and realty development. In addition to the main
       pengembangan properti dan realti. Selain kegiatan                                                 business activities, the Company also carries out
       usaha utama, Perusahaan juga melakukan                                                            supporting     business    activities    such    as
       kegiatan usaha pendukung yakni layanan jasa                                                       management consulting services, conducting
       konsultasi (konsultan) manajemen, melakukan                                                       business in the field of agro industry, and
       usaha di bidang agro industri, dan layanan jasa                                                   information technology and tourism services.
       bidang teknologi informasi dan kepariwisataan.

       Kegiatan usaha Perusahaan yang saat ini telah                                                     The Company's current business activities
       dijalankan   Perusahaan      adalah     kegiatan                                                  are construction activities and integrated EPC.
       pelaksanaan konstruksi dan pekerjaan terintegrasi
       EPC.




                                                                                    26
Page 30
                                                                                             The original consolidated financial statements included herein are in
                                                                                                                                        the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                                  PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                                            AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                                        FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                               AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                                      MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                                          (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                                 (Expressed in full Rupiah amount, unless otherwise stated)

  e.   Organisasi                                                                       e.      Organization

       Struktur Organisasi                                                                      Organization Structure

       Berdasarkan Surat Keputusan Menteri Negara                                               According to the Decree of State Ministry of State
       Badan Usaha Milik Negara (BUMN) dalam Rapat                                              Owned Enterprise (BUMN) during the General
       Umum Pemegang Saham (RUPS) Perusahaan                                                    Meeting of Shareholders (GMS) of the Company
       tanggal 25 Mei 2023, menetapkan 7 (tujuh)                                                dated May 25, 2023, appointed 7 (seven) directors
       anggota direksi Perusahaan yaitu seorang direktur                                        of the Company consisting of a president director
       utama dan 6 (enam) direktur.                                                             and 6 (six) directors.

       Wilayah     kerja     Perusahaan      ditentukan                                         The Company’s work areas are according to
       berdasarkan      Surat    Keputusan       Direksi                                        the       Decision       Letter of     Directors
       No. 11/SK/WK/2023 tanggal 28 Maret 2023                                                  No. 11/SK/WK/2023 dated March 28, 2023
       tentang    Perubahan      Struktur    Organisasi                                         concerning Changes in the Organizational
       Perusahaan. Unit bisnis memiliki 5 (lima) divisi,                                        Structure of the Company. The business unit have
       sebagai berikut:                                                                         5 (five) divisions, as follows:


                 Unit Bisnis/                                                Wilayah Operasi/                                               Kedudukan/
                Business Unit                                                  Work Areas                                                    Location

                Divisi Gedung/           Daerah operasional meliputi seluruh Indonesia, berkedudukan di Jakarta dengan                         Jakarta
               Building Division         melaksanakan kegiatan Perusahaan dalam bidang pemasaran sampai dengan produksi
                                         untuk pekerjaan proyek gedung, bandara, Light Rail Transit (LRT), jalur kereta api,
                                         pengembangan kawasan, dan lain-lain termasuk proyek-proyek investasi dan
                                         pengembangan terpilih yang ditetapkan Direksi dengan nilai kontrak > Rp 100 Miliar.

                                         Operational area covers the whole area of Indonesia, domiciled in Jakarta to perform
                                         its activities in marketing to production for the entire building project for the works of
                                         buildings, airports, Light Rail Transit (LRT), railway, area development, and others as
                                         well as selected investment and development projects established by the Board of
                                         Directors with contract value > Rp 100 Billion.

              Divisi Infrastruktur I/    Daerah operasional meliputi seluruh Indonesia, berkedudukan di Jakarta dengan                         Jakarta
           Infrastructure I Division     melaksanakan kegiatan Perusahaan dalam bidang pemasaran sampai dengan produksi
                                         untuk pekerjaan proyek-proyek infrastruktur sipil non jalan dan jembatan seperti
                                         bendungan, irigasi, bangunan air, pelabuhan, dermaga, pengaman pantai dan lain-lain
                                         termasuk proyek-proyek investasi dan pengembangan terpilih yang ditetapkan oleh
                                         Direksi dengan nilai kontrak > Rp 100 Miliar.

                                         Operational area covers the whole are of Indonesia, domiciled in Jakarta to perform its
                                         activities in marketing to production for non-road and bridge civil infrastructure
                                         projects, such as dams, irrigation, water building, port, piers, revetment and others as
                                         well as selected investment and development projects established by the Board of
                                         Directors with contract value > Rp 100 Billion.

              Divisi Infrastruktur II/   Daerah operasional meliputi seluruh Indonesia, berkedudukan di Jakarta dengan                         Jakarta
           Infrastructure II Division    melaksanakan kegiatan Perusahaan dalam bidang pemasaran sampai dengan produksi
                                         untuk pekerjaan proyek-proyek infratruktur sipil jalan dan jembatan termasuk proyek-
                                         proyek investasi dan pengembangan terpilih yang ditetapkan oleh Direksi dengan nilai
                                         kontrak > Rp 100 Miliar.


                                         Operational area covers the whole area of Indonesia, domiciled in Jakarta to perform
                                         its activities in marketing to production for road and bridge civil infrastructure projects
                                         such as road including selected investment and development projects established by
                                         the Board of Directors with contract value > Rp 100 Billion.




                                                                            27
Page 31
                                                                                            The original consolidated financial statements included herein are in
                                                                                                                                       the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                                    PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                                              AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                                          FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                                 AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                                        MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                                            (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                                  (Expressed in full Rupiah amount, unless otherwise stated)

                    Unit Bisnis/                                                 Wilayah Operasi/                                              Kedudukan/
                   Business Unit                                                   Work Areas                                                   Location


              Divisi Infrastruktur III/    Daerah operasional meliputi seluruh Indonesia, berkedudukan di Jakarta dengan                         Jakarta
                Infra III Division         melaksanakan kegiatan Perusahaan dalam bidang pemasaran sampai dengan produksi
                                           untuk pekerjaan proyek-proyek EPC seperti power plant, industrial plant, smelter,
                                           transmisi-distribusi air, sewerage, sistem penyedia air minum, oil dan gas, dan lain-lain
                                           termasuk proyek-proyek investasi dan pengembangan terpilih yang ditetapkan oleh
                                           Direksi, dengan dengan nilai kontrak > Rp 100 Miliar.

                                           Operational area covers the whole area of Indonesia, domiciled in Jakarta to perform
                                           its activities in marketing to production for EPC projects such as power plant, industrial
                                           plant, smelter, transmission-distribution of water, sewerage, drinking water distribution
                                           system, oil and gas, and others as well as selected investment and development
                                           projects established by the Board of Directors, with with contract value > Rp 100
                                           Billion.
              Divisi Luar Negeri/          Daerah operasional luar negeri meliputi Middle East Asia, South East Asia, South Asia ,               Jakarta
              Overseas Division            dan Africa , berkedudukan di Jakarta dengan melaksanakan kegiatan Perusahaan dalam
                                           bidang pemasaran sampai dengan produksi untuk pekerjaan proyek-proyek di luar
                                           negeri baik gedung, infrastruktur dan EPC termasuk proyek-proyek investasi dan
                                           pengembangan terpilih yang ditetapkan oleh Direksi, dengan tidak ada batasan nilai
                                           kontrak.

                                           Operational area covers overseas such as Middle East Asia, South East Asia, South
                                           Asia, and Africa, domiciled in Jakarta to perform its activities in marketing to
                                           production for pojects in overseas include building, infrastructure, and EPC including
                                           selected investment and development projects established by the Board of Directors,
                                           with no contract restriction.


   f.   Susunan Dewan                     Komisaris,        Direksi          dan            f.       The   Composition      of    Boards    of
        Karyawan                                                                                     Commissioners, Directors, and Employees

        Susunan Komisaris dan Direksi pada tanggal                                                  The composition of Boards of Commissioners
        30 Juni 2023 dan 31 Desember 2022 ditetapkan                                                and Directors as of June 30, 2023 and
        berdasarkan akta notaris No. 8 tanggal 8 Juni 2023                                          December 31, 2022, was based on notarial deed
        yang dibuat dihadapan notaris Ashoya Ratam, S.H.,                                           No. 8 dated June 8, 2023 of notary Ashoya
        M.Kn., yang telah disetujui oleh Menteri Hukum dan                                          Ratam, S.H., M.Kn., which has been approved
        Hak Asasi Manusia dengan Surat Keputusan No.                                                by the Minister of Law and Human Rights in his
        AHU-AH.01.09-0125514 tanggal 9 Juni 2023.                                                   Decision Letter No. AHU-AH.01.09-0125514
                                                                                                    dated June 9, 2023.

        Susunan pengurus Dewan Komisaris dan Direksi                                                The composition of the Company’s Boards of
        Perusahaan pada tanggal 30 Juni 2023 dan                                                    Commissioners    and    Directors as    of
        31 Desember 2022 adalah sebagai berikut:                                                    June 30, 2023 and December 31, 2022 is as
                                                                                                    follows:

                                                                30 Juni/                             31 Desember/
                                                             June 30, 2023                         December 31, 2022
        Komisaris Utama/ Independen                          Heru Winarko                            Heru Winarko                President/ Independent Commissioner
        Komisaris Independen                               Muhammad Salim                          Muhammad Salim                        Independent Commissioners
                                                                Muradi                                 Muradi
                                                           Addin Jauharudin
        Komisaris                                             T Iskandar                               T Iskandar                                    Commissioners
                                                           Dedi Syarif Usman                       Ahmad Erani Yustika
                                                        I Gde Made Kartikajaya                      Dedi Syarif Usman
                                                                                                 I Gde Made Kartikajaya

                                                                30 Juni/                             31 Desember/
                                                             June 30, 2023                         December 31, 2022
        Direktur Utama                                         Mursyid                       Destiawan Soewardjono                                 President Director
        Direktur                                             Ratna Ningrum                            Mursyid                                               Directors
                                                            Wiwi Suprihatno                       Wiwi Suprihatno
                                                      I Ketut Pasek Senjaya Putra           I Ketut Pasek Senjaya Putra
                                                              Rudi Purnomo                        Bambang Rianto
                                                             Dhetik Ariyanto                 Septiawan Andri Purwanto
                                                                 Warjo                                 Warjo



                                                                              28
Page 32
                                                                          The original consolidated financial statements included herein are in
                                                                                                                     the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                     PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                               AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                 NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                           FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                  AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                         MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                             (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                 (Expressed in full Rupiah amount, unless otherwise stated)

         Komite Audit diangkat melalui surat keputusan                         The Audit Committee was appointed through
         Dewan Komisaris No. 07/SK/WK/DK/2023 tanggal                          the decision letter of the Board of Commissioners
         31 Mei 2023.                                                          No. 07/SK/WK/DK/2023 dated May 31, 2023.

         Susunan Komite Audit Perusahaan pada tanggal                           The composition of the Company’s Audit
         30 Juni 2023 dan 31 Desember 2022 adalah                               Committee as of June 30, 2023 and December
         sebagai berikut:                                                       31, 2022 are as follows:

                                                     30 Juni/                       31 Desember/
                                                  June 30, 2023                   December 31, 2022
          Ketua                                  Muhammad Salim                   Muhammad Salim                                           Head
          Anggota                                    Muradi                       Ihda Muktiyanto                                       Members
                                                 Ihda Muktiyanto                 Yodi Armawidiatmo
                                                  Djoko Wibowo


         Komite Pemantau Manajemen Risiko diangkat                             The Risk Management Monitoring Committee was
         melalui surat keputusan Dewan Komisaris                               appointed through the decision letter of
         No. 08/SK/WK/DK/2023 tanggal 6 Juni 2023                              the       Board      of        Commissioners
         mengenai Perubahan Keanggotaan Komite                                 No. 08/SK/WK/DK/2023 dated June 6, 2023
         Pemantau Manajemen Risiko.                                            regarding the Changes in the Member of
                                                                               the Risk Management Monitoring Committee.

         Susunan Komite Pemantau Manajemen Risiko                               The composition of the Company’s Risk
         Perusahaan pada tanggal 30 Juni 2023 dan                               Management Monitoring Committee as of
         31 Desember 2022 adalah sebagai berikut:                               June 30, 2023 and December 31, 2022 are as
                                                                                follows:

                                                     30 Juni/                      31 Desember/
                                                  June 30, 2023                  December 31, 2022
          Ketua                                    T. Iskandar                         Muradi                                              Head
          Anggota                               Dedi Syarif Usman               Ahmad Erani Yustika                                    Members
                                                 Dedy Gunawan                    Djaka Kusmartata
                                                Addin Jauharudin                 Dedi Syarif Usman
                                                 Mohamad Nasir                    Dedy Gunawan


         Komite Nominasi dan Remunerasi diangkat melalui                        The Nomination and Remuneration Committee
         surat    keputusan      Dewan        Komisaris                         was appointed through the decision letter of
         No. 12/SK/WK/DK/2023 tanggal 27 Juni 2023                              the       Board      of      Commissioners
         mengenai Pemberhentian dan Pengangkatan                                No. 12/SK/WK/DK/2021 dated June 27, 2023
         Anggota Nominasi dan Remunerasi.                                       regarding the Dismissal and Appointment of
                                                                                Members of the Nomination and Remuneration
                                                                                Committee.

         Susunan Komite Nominasi dan Remunerasi                                 The composition of the Company’s Nomination
         Perusahaan pada tanggal 30 Juni 2023 dan                               and      Remuneration  Committee   as     of
         31 Desember 2022 adalah sebagai berikut:                               June 30, 2023 and December 31, 2022 are as
                                                                                follows:

                                                     30 Juni/                      31 Desember/
                                                  June 30, 2023                  December 31, 2022
          Ketua                                   Heru Winarko                     Heru Winarko                                            Head
          Anggota                                    Zamroni                         T. Iskandar                                       Members
                                              I Gde Made Kartikajaya                  Zamroni
                                                                               I Gde Made Kartikajaya

         Internal Audit Perusahaan diangkat melalui surat                       The Company’s Internal Audit was appointed
         keputusan         Dewan       Direksi       No.                        throuh the decision letter of the Board of Directors
         14/SK/WK/PEN/2023 tanggal 19 Januari 2023                              No. 14/SK/WK/PEN/2023 dated January 19, 2023
         mengenai Pemberhentian dan Pengangkatan                                regarding the Dismissal and Appointment of
         Pejabat     Struktural.  Corporate    Secretary                        Structural Officials. The Company’s Corporate
         Perusahaan diangkat melalui surat keputusan                            Secretary was appointed throuh the decision
         Dewan Direksi No. 14/SK/WK/PEN/2023 tanggal                            letter of the Board of Directors No.

                                                                  29
Page 33
                                                                                       The original consolidated financial statements included herein are in
                                                                                                                                  the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                              (Expressed in full Rupiah amount, unless otherwise stated)

         19 Januari 2023 mengenai Pemberhentian dan                                          14/SK/WK/PEN/2023 dated January 19, 2023
         Pengangkatan Pejabat Struktural.                                                    regarding the Dismissal and Appointment of
                                                                                             Structural Officials.

         Senior Vice President Internal Audit dan Corporate                                  The Company’s Senior Vice President for Internal
         Secretary tanggal 30 Juni 2023 dan 31 Desember                                      Audit and Corporate Secretary as of June 30,
         2022 adalah sebagai berikut:                                                        2023 and December 31, 2022 are as follows:

                                                                30 Juni/                       31 Desember/
                                                             June 30, 2023                   December 31, 2022
          Senior Vice President Internal Audit           AS Wisnu Wijayanto                 Dwi Agus Rahsetiyo                    Senior Vice Precident Internal Audit
          Corporate Secretary                            Ermy Puspa Yunita                  Novianto Ari Nugroho                                 Corporate Secretary


         Jumlah remunerasi yang diterima oleh Dewan                                         The total remuneration received by the Board of
         Komisaris untuk periode-periode enam bulan yang                                    Commissioners      for    the    six    months
         berakhir 30 Juni 2023 dan 2022 masing-                                             periods ended June 30, 2023 and 2022
         masing     sebesar      Rp5.665.205.764     dan                                    amounting      to      Rp5,665,205,764     and
         Rp6.306.974.561.                                                                   Rp6,306,974,561, respectively.

         Jumlah remunerasi yang diterima oleh Direksi                                       The     total    remuneration    received    by
         untuk periode-periode enam bulan yang berakhir                                     the Directors for the six months periods ended
         30 Juni 2023 dan 2022 masing - masing sebesar                                      June 30, 2023 and 2022 amounting to
         Rp10.740.443.080 dan Rp11.967.425.000.                                             Rp10,740,443,080      and     Rp11,967,425,000,
                                                                                            respectively.

         Grup memiliki karyawan tetap (tidak diaudit)                                       The Group has an average number of 2,745 and
         masing-masing sebesar 2.745 dan 2.857 orang                                        2,857     employees   (unaudited)    as   of
         pada tanggal 30 Juni 2023 dan 31 Desember 2022.                                    June 30, 2023 and December 31, 2022,
                                                                                            respectively

2.   IKHTISAR   KEBIJAKAN                        AKUNTANSI       YANG           2.    SUMMARY                 OF   SIGNIFICANT             ACCOUNTING
     SIGNIFIKAN                                                                       POLICIES

     a. Pernyataan Kepatuhan                                                          a.    Statement of Compliance

        Laporan keuangan konsolidasian Grup disusun dan                                      The consolidated financial statements of
        disajikan sesuai dengan Standar Akuntansi                                            the Group have been prepared and presented in
        Keuangan di Indonesia yang mencakup Pernyataan                                       accordance to Indonesian Financial Accounting
        dan Interpretasi yang diterbitkan oleh Dewan                                         Standards which include Statements and
        Standar Akuntansi Keuangan Ikatan Akuntan                                            Interpretations issued by the Financial Accounting
        Indonesia dan peraturan regulator pasar modal yaitu                                  Standards       Board     of    the     Indonesian
        Peraturan No. VIII.G.7 tentang Penyajian dan                                         Institute of Accountants and regulations of capital
        Pengungkapan Laporan Keuangan Emiten atau                                            market       regulator,     namely      Regulation
        Perusahan Publik.                                                                    No. VIII.G.7 regarding Presentation and
                                                                                             Disclosure of Financial Statements of the Issuer
                                                                                             or Public Company.

     b. Dasar Pengukuran dan Penyusunan Laporan                                       b.    The Basis of Measurement and Preparation of
        Keuangan Konsolidasian                                                              Consolidated Financial Statements

        Dasar pengukuran dalam penyusunan laporan                                           The basic measurement in the preparation of
        keuangan konsolidasian ini adalah konsep biaya                                      these consolidated financial statements is
        perolehan (historical cost), kecuali untuk akun aset                                the historical cost method, except for
        tetap yang telah dinilai kembali (revaluasi) di tahun                               the revaluation of fixed assets in year 2021,
        2021, investasi dalam efek tertentu yang dicatat                                    investments in shares of stock which are carried at
        sebesar nilai wajarnya atau dicatat menggunakan                                     its fair value or accounted for under
        metode ekuitas, persediaan yang dinyatakan                                          the equity method, and inventories which
        sebesar nilai yang lebih rendah antara harga                                        are carried at the lower of cost and net realizable
        perolehan dan nilai realisasi bersih (the lower of cost                             value. The consolidated financial statements are
        or net realizable value). Laporan keuangan                                          prepared based on going concern using
        konsolidasian    disusun      berdasarkan      asumsi


                                                                           30
Page 34
                                                                  The original consolidated financial statements included herein are in
                                                                                                             the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                             PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                       AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                         NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                   FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                          AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                 MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                     (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)         (Expressed in full Rupiah amount, unless otherwise stated)

        kelangsungan usaha serta menggunakan metode                    the accrual method, except for the consolidated
        akrual kecuali untuk laporan arus kas konsolidasian.           statements of cash flows.

        Laporan arus kas konsolidasian disusun dengan                   The consolidated statements of cash flows are
        menggunakan metode langsung (direct method)                     prepared using the direct method by classifying
        dengan mengelompokkan arus kas ke dalam                         cash flows into operating, investing and financing
        aktivitas operasi, investasi dan pendanaan.                     activities.

        Mata uang penyajian yang digunakan dalam                        The presentation currency used in the preparation
        penyusunan laporan keuangan konsolidasian ini                   of the consolidated financial statements is
        adalah Rupiah (Rp) yang merupakan mata uang                     Indonesian Rupiah (Rp) which is the functional
        fungsional Grup. Setiap entitas di dalam Grup                   currency of the Group. Each entity in the Group
        menetapkan mata uang fungsional sendiri dan                     determines its own functional currency and items
        unsur-unsur dalam laporan keuangan konsolidasian                included in the consolidated financial statements
        dari setiap entitas diukur berdasarkan mata uang                of each entity are measured using that functional
        fungsional tersebut.                                            currency.

   c. Prinsip-Prinsip Konsolidasian                               c.   Principles of Consolidation

        Laporan keuangan konsolidasian mencakup                        The consolidated financial statements incorporate
        laporan keuangan Perusahaan dan entitas-entitas                the financial statements of the Company and its
        anak seperti disebutkan pada Catatan 1.b.                      subsidiaries as described in Note 1.b.

        Entitas anak adalah entitas yang dikendalikan oleh             A subsidiary is an entity controlled by
        Grup, yakni Grup terekspos, atau memiliki hak, atas            the Group, i.e. the Group is exposed, or has rights,
        imbal hasil variabel dari keterlibatannya dengan               to variable returns from its involvement with
        entitas   dan      memiliki   kemampuan       untuk            the entity and has the ability to affect those returns
        mempengaruhi imbal hasil tersebut melalui                      through its current ability to direct the entity’s
        kemampuan kini untuk mengarahkan aktivitas                     relevant activities (power over the investee).
        relevan dari entitas (kekuasaan atas investee).

        Keberadaan dan dampak dari hak suara potensial                 The existence and effect of substantive potential
        dimana Grup memiliki kemampuan praktis untuk                   voting rights where the Group has the practical
        melaksanakan       (yakni   hak     substantif)                ability to execute (i.e. substantive rights)
        dipertimbangkan saat menilai apakah Grup                       are considered when assessing whether the
        mengendalikan entitas lain.                                    Group controls another entity.

        Laporan keuangan konsolidasian Grup mencakup                   The Group’s consolidated financial statements
        hasil usaha, arus kas, aset dan liabilitas dari                incorporate the results, cash flows, assets and
        Perusahaan dan seluruh entitas anak yang secara                liabilities of the Company and all of its subsidiaries
        langsung dan tidak langsung dikendalikan oleh                  are directly and indirectly controll. Subsidiaries
        Perusahaan. Entitas anak dikonsolidasikan sejak                are consolidated from the effective date of
        tanggal efektif akuisisi, yaitu tanggal dimana Grup            acquisition, which is the date on which the Group
        secara efektif memperoleh pengendalian atas bisnis             effectively obtains control of the acquired
        yang diakuisisi, sampai tanggal kehilangan                     business, until that control is lost.
        pengendalian.

        Entitas induk menyusun laporan keuangan                        A parent prepares consolidated financial
        konsolidasian dengan menggunakan kebijakan                     statements using uniform accounting policies for
        akuntansi yang sama untuk transaksi dan peristiwa              transactions and other events in similar
        lain dalam keadaan yang serupa. Seluruh transaksi,             circumstances. All intragroup transactions,
        saldo, penghasilan, beban, dan arus kas dalam intra            balances, income, expenses and cash flows
        kelompok usaha terkait dengan transaksi antar                  relating to transaction between entities of
        entitas dalam grup dieliminasi secara penuh.                   the group are fully eliminated.

        Grup mengatribusikan laba rugi dan setiap                      The Group attributes the profit and loss and each
        komponen dari penghasilan komprehensif lain                    component of other comprehensive income to
        kepada pemilik entitas induk dan kepentingan non-              the owners of the parent and non-controlling
        pengendali meskipun hal tersebut mengakibatkan                 interest even though this results in the non-
        kepentingan non-pengendali memiliki saldo defisit.             controlling interests having a deficit balance.
        Grup menyajikan kepentingan non-pengendali di                  The Group presents non-controlling interest in
        ekuitas   dalam      laporan   posisi   keuangan               equity in the consolidated statement of financial


                                                          31
Page 35
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

        konsolidasian, terpisah dari ekuitas pemilik entitas            position, separately from the equity owners of the
        induk.                                                          parent.

       Perubahan dalam bagian kepemilikan entitas induk                 Changes in the parent’s ownership interest in a
       pada entitas anak yang tidak mengakibatkan                       subsidiary that do not result in loss of control are
       hilangnya pengendalian adalah transaksi ekuitas                  equity transactions (i.e. transactions with owners
       (yaitu transaksi dengan pemilik dalam kapasitasnya               in their capacity as owners). When the proportion
       sebagai pemilik). Ketika proporsi ekuitas yang                   of equity held by non-controlling interest change,
       dimiliki oleh kepentingan non-pengendali berubah,                the Group adjusts the carrying amounts of
       Grup menyesuaikan jumlah tercatat kepentingan                    the controlling interest and non-controlling interest
       pengendali dan kepentingan non-pengendali untuk                  to reflect the changes in their relative interest in
       mencerminkan perubahan kepemilikan relatifnya                    the subsidiaries. Any difference between
       dalam entitas anak. Selisih antara jumlah dimana                 the amount by which the non-controlling interests
       kepentingan non-pengendali disesuaikan dan nilai                 are adjusted and the fair value of the consideration
       wajar dari jumlah yang diterima atau dibayarkan                  paid or received is recognized directly in equity
       diakui langsung dalam ekuitas dan diatribusikan                  and attributed to the owners of the parent.
       pada pemilik dari entitas induk.

       Jika Grup kehilangan pengendalian, maka Grup:                    If the Group loses control, the Group:

       •    Menghentikan pengakuan aset (termasuk                       •     Derecognizes the assets (including goodwill)
            goodwill) dan liabilitas entitas anak pada jumlah                 and liabilities of the subsidiary at their carrying
            tercatatnya ketika pengendalian hilang;                           amounts at the date when control is lost;
       •    Menghentikan pengakuan jumlah tercatat                      •     Derecognizes the carrying amount of any non-
            setiap kepentingan non-pengendali pada                            controlling interests in the former subsidiary at
            entitas anak terdahulu ketika pengendalian                        the date when control is lost (including any
            hilang (termasuk setiap komponen penghasilan                      components of other comprehensive income
            komprehensif lain yang diatribusikan pada                         attributable to them);
            kepentingan non-pengendali);
       •    Mengakui nilai wajar pembayaran yang diterima               •     Recognizes        the      fair     value  of
            (jika ada) dari transaksi, peristiwa, atau                        the consideration received, (if any) from
            keadaan yang mengakibatkan hilangnya                              the transaction, event or circumstances that
            pengendalian;                                                     resulted in the loss of control;
       •    Mengakui sisa investasi pada entitas anak                   •     Recognizes any investment retained in
            terdahulu pada nilai wajarnya pada tanggal                        the former subsidiary at fair value at
            hilangnya pengendalian;                                           the date when control is lost;
       •    Mereklasifikasi ke laba rugi, atau mengalihkan              •     Reclassifies to profit or loss, or transfer
            secara langsung ke saldo laba jika disyaratkan                    directly to retained earnings if required by
            oleh SAK lain, jumlah yang diakui dalam                           other PSAKs, the amount recognized in other
            penghasilan komprehensif lain dalam kaitan                        comprehensive income in relation to
            dengan entitas anak; dan                                          the subsidiary; and
       •    Mengakui perbedaan apapun yang dihasilkan                   •     Recognizes any resulting difference as a gain
            sebagai keuntungan atau kerugian dalam laba                       or loss attributable to the parent.
            rugi yang diatribusikan kepada entitas induk.

   d. Perubahan Kebijakan Akuntansi                                d.   Adoption of New / Revised Standards

       Amendemen/Penyesuaian Standar yang Berlaku                       Amendments/Improvements to                         Standards
       Efektif pada Periode Berjalan                                    Effective in the Current Period

       Pada periode ini, Grup telah mengaplikasikan                     In the current period, the Group has applied a
       beberapa amendemen/penyesuaian atas beberapa                     number of amendments/improvements to PSAKs
       PSAK yang relevan terhadap operasional, dan                      that are relevant to its operations and effective for
       berlaku efektif untuk akuntansi periode yang dimulai             accounting period beginning on or after January 1,
       pada atau setelah tanggal 1 Januari 2023, sebagai                2023 as follows:
       berikut:

        •   PSAK 73 (Amendemen) “Sewa”: Konsesi Sewa                    •    PSAK 73 (Amendment), “Leases”: Covid-19-
            terkait Covid-19 setelah 30 Juni 2021                            related lease concession beyond June 30,
                                                                             2021



                                                          32
Page 36
                                                                  The original consolidated financial statements included herein are in
                                                                                                             the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                             PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                       AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                         NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                   FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                          AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                 MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                     (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)         (Expressed in full Rupiah amount, unless otherwise stated)

            Amendemen         tersebut    memperpanjang                     The amendment extends the availability of
            kebijakan praktis konsesi sewa terkait Covid-19                 the practical expedient for Covid-19 related
            dimana      segala     bentuk     pengurangan                   lease concessions for which any reduction in
            pembayaran sewa hanya memengaruhi                               lease payments affects only payments
            pembayaran sewa pada atau sebelum tanggal                       originally due on or before June 30, 2022.
            30 Juni 2022.
                                                                       •    PSAK      22      (amendment)    Business
        •   PSAK 22 (Amendemen), “Kombinasi Bisnis”:                        Combinations       on    References    to
            Referensi ke Kerangka Konseptual                                the Conceptual Framework

                                                                            This PSAK 22 amendment clarifies the
            Amendemen PSAK 22 ini mengklarifikasi                           interaction between PSAK 22, PSAK 57, ISAK
            interaksi antara PSAK 22, PSAK 57, ISAK 30                      30 and the Conceptual Framework for
            dan Kerangka Konseptual Pelaporan Keuangan                      Financial    Reporting  without   changing
            tanpa mengubah persyaratan akuntansi untuk                      the accounting requirements for business
            kombinasi bisnis.                                               combinations.

        •   PSAK 57 (amendemen) Provisi, Liabilitas                    •    PSAK 57 (amendment) Provisions, Contingent
            Kontinjensi dan Aset Kontinjensi tentang                        Liabilities and Contingent Assets: Onerous
            Kontrak Memberatkan - Biaya Memenuhi                            Contracts - Cost of Fulfilling the Contracts
            Kontrak

            Amendemen ini mengklarifikasi biaya untuk                       This amendment clarifies the cost of fulfilling a
            memenuhi suatu kontrak dalam kaitannya dalam                    contract in relation to determining whether a
            menentukan apakah suatu kontrak merupakan                       contract is a onerous contract.
            kontrak memberatkan.

            Amendemen PSAK 57 mengatur bahwa biaya                          Amendments to PSAK 57 provide that
            untuk memenuhi kontrak terdiri dari biaya yang                  the costs to fulfill the contract consist of costs
            berhubungan langsung dengan kontrak. Biaya                      directly related to the contract. Costs directly
            yang berhubungan langsung dengan kontrak                        related to the contract consist of both
            terdiri dari biaya inkremental untuk memenuhi                   incremental costs of fulfilling that contract
            kontrak tersebut (misalnya tenaga kerja                         (examples would be direct labor or materials)
            langsung atau material) dan alokasi biaya lain                  and an allocation of other costs that relate
            yang berhubungan langsung untuk memenuhi                        directly to fulfilling contracts (an example
            kontrak (misalnya alokasi biaya penyusutan atas                 would be the allocation of the depreciation
            aset tetap yang digunakan dalam memenuhi                        charge for an item of property, plant and
            kontrak tersebut).                                              equipment used in fulfilling the contract).

        •   PSAK 71 Instrumen Keuangan (Penyesuaian                    •    PSAK 71 Financial Instruments (2020 Annual
            Tahunan 2020)                                                   Improvements)

            PSAK 71 (Penyesuaian 2020) mengklarifikasi                      PSAK 71 (2020 Annual Improvements)
            fee (imbalan) yang diakui oleh peminjam terkait                 clarifies fee recognized by the borrower in
            penghentian pengakuan liabilitas keuangan.                      relation to derecognition of financial liabilities.
            Dalam menentukan fee (imbalan) yang                             In determining the fee to be paid after
            dibayarkan setelah dikurangi fee (imbalan) yang                 deducting the fee received, entity includes only
            diterima, peminjam hanya memasukkan fee                         fees paid or received between the entity (the
            (imbalan) yang dibayarkan atau diterima antara                  borrower) and the lender, including fees paid
            peminjam dan pemberi pinjaman, termasuk fee                     or received by either the entity or the lender on
            (imbalan) yang dibayar atau diterima baik                       the other’s behalf.
            peminjam atau pemberi pinjaman atas nama
            pihak lain.

        •   PSAK 73 Sewa (Penyesuaian Tahunan 2020)                    •    PSAK 73 Leases (2020 Annual Improvements)

            PSAK 73 (Penyesuaian Tahunan 2020)                              PSAK 73 (2020 Annual Improvements)
            menghilangkan dari contoh ilustrasi penggantian                 removes from the example the illustration of
            biaya properti sewaan dari pesewa untuk                         the reimbursement of leasehold improvements
            mengatasi    potensi    kebingungan      terkait                by the lessor in order to resolve any potential
            perlakuan insentif sewa yang mungkin timbul                     confusion regarding the treatment of lease

                                                          33
Page 37
                                                                    The original consolidated financial statements included herein are in
                                                                                                               the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                               PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                         AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                           NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                     FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                            AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                   MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                       (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)           (Expressed in full Rupiah amount, unless otherwise stated)

            karena bagaimana insentif sewa diilustrasikan                     incentives that might arise because of how
            dalam contoh tersebut.                                            lease incentives are illustrated in that example.

        Penerapan      atas    PSAK     baru/revisi   tidak              The adoption of these revised PSAK does not
        mengakibatkan       perubahan    atas    kebijakan               result in changes to the Group’s accounting
        akuntansi Grup dan tidak memiliki dampak material                policies and has no material effect on
        terhadap jumlah yang dilaporkan pada tahun                       the amounts reported for the current or prior years.
        berjalan atau tahun-tahun sebelumnya.

       Standar,     Amendemen/Penyesuaian     dan                        Standards, Amendments/Improvements and
       Interpretasi Standar Telah Diterbitkan Tapi                       Interpretations to Standards Issued not yet
       Belum Diterapkan                                                  Adopted

       Pada tanggal persetujuan laporan keuangan                         At the date of authorization of these consolidated
       konsolidasian amendemen-amendemen atas PSAK                       financial statements, the following amendments to
       yang relevan bagi Grup, yang telah diterbitkan                    PSAKs relevant to the Group were issued but not
       namun belum berlaku efektif, dengan penerapan dini                effective, with early application permitted:
       diizinkan, adalah sebagai berikut:
       Efektif untuk periode yang dimulai pada atau setelah              Effective for periods beginning on or after January
       tanggal 1 Januari 2023                                            1, 2023

        •   PSAK 1 (amendemen) Penyajian Laporan                         •    PSAK 1 (amendment) Presentation of financial
            Keuangan: Klasifikasi Liabilitas sebagai Jangka                   statements: Classification of Liabilities as
            Pendek atau Jangka Panjang                                        Current or Non-currrent
            Amendemen PSAK 1, “Penyajian Laporan                              The narrow-scope amendments to PSAK 1,
            Keuangan” mengklarifikasi bahwa kewajiban                         “Presentation of Financial Statements” clarify
            diklasifikasikan sebagai lancar atau tidak lancar,                that liabilities are classified as either current or
            berdasarkan pada hak yang ada pada akhir                          non-current, depending on the rights that exist
            periode pelaporan. Klasifikasi tidak terpengaruh                  at the end of the reporting period. Classification
            oleh ekspektasi entitas atau peristiwa setelah                    is unaffected by the expectations of the entity
            tanggal pelaporan (misalnya penerimaan waiver                     or events after the reporting date
            atau pelanggaran perjanjian). Amendemen                           (e.g the receipt of a waiver or a breach of
            tersebut juga mengklarifikasi apa yang                            covenant). The amendments also clarify what
            dimaksud PSAK 1 perihal 'penyelesaian'                            PSAK 1 means when it refers to
            liabilitas.                                                       the ‘settlement’ of a liability.
        •   PSAK 16 (amendemen) Aset Tetap: Hasil                        •    PSAK 16 (amendment) Property, Plant and
            Sebelum Penggunaan yang Diintensikan                              Equipment: Proceeds before Intended Use
        •   PSAK 25 (Amendemen) Kebijakan Akuntansi,                     •    PSAK 25 (Amendment) Accounting Policies,
            Perubahan Estimasi Akuntansi, dan Kesalahan:                      Changes in Accounting Estimates and Errors:
            Definisi Estimasi Akuntansi                                       Definition of Accounting Estimates
        •   PSAK 1 (Amendemen) Penyajian Laporan                         •    Amendments to PSAK 1 (Amendment)
            Keuangan: Pengungkapan Kebijakan Akuntansi                        Presentation    of   Financial    Statements:
                                                                              Disclosure of Accounting Policies
            Amendemen ini memberikan panduan dan                              This amendment provides guidance and
            contoh untuk membantu entitas menerapkan                          examples to help entities apply materiality
            pertimbangan materialitas dalam pengungkapan                      judgments to accounting policy disclosures.
            kebijakan akuntansi. Amendemen tersebut                           The amendment aims to help entities provide
            bertujuan untuk membantu entitas menyediakan                      accounting policy disclosures that are more
            pengungkapan kebijakan akuntansi yang lebih                       useful by replacing the requirement for entities
            berguna dengan mengganti persyaratan untuk                        to disclose their ‘significant’ accounting
            mengungkapkan kebijakan akuntansi 'signifikan                     policies with a requirement to disclose their
            entitas      dengan     persyaratan     untuk                     ‘material’ accounting policies and adding
            mengungkapkan kebijakan akuntansi 'material'                      guidance on how entities apply the concept of
            entitas dan menambahkan panduan tentang                           materiality in making decisions about
            bagaimana entitas menerapkan konsep                               accounting policy disclosures
            materialitas dalam membuat keputusan tentang
            pengungkapan kebijakan akuntansi.

                                                           34
Page 38
                                                                  The original consolidated financial statements included herein are in
                                                                                                             the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                             PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                       AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                         NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                   FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                          AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                 MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                     (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)         (Expressed in full Rupiah amount, unless otherwise stated)

       Efektif untuk periode yang dimulai pada atau setelah            Effective for periods beginning on or after January
       tanggal 1 Januari 2025                                          1, 2025

        •   PSAK 74 Kontrak Asuransi                                   •    PSAK 74 Insurance Contracts

            PSAK 74 mengatur relaksasi beberapa                            PSAK 74 regulates the relaxation of several
            ketentuan antara lain berupa penambahan                        provisions, including the addition of scope
            pengecualian ruang lingkup, penyesuaian                        exceptions, adjustments to the presentation of
            penyajian laporan keuangan, penerapan opsi                     financial statements, application of risk
            mitigasi risiko dan beberapa modifikasi pada                   mitigation options and some modifications to
            ketentuan transisi. PSAK 74 juga mensyaratkan                  transitional provisions. PSAK 74 also requires
            pemisahan yang jelas antara pendapatan yang                    a clear separation between income generated
            dihasilkan dari bisnis asuransi dengan yang                    from the insurance business and from
            berasal dari kegiatan investasi.                               investment activities.

       Sampai dengan tanggal penerbitan laporan                        As of the issuance date of the consolidated
       keuangan konsolidasian, dampak dari penerapan                   financial statements, the effects of adopting these
       amendemen-amendemen terhadap PSAK terhadap                      standards and        amendments to          PSAKs
       laporan keuangan konsolidasian tidak dapat                      on the consolidated financial statements are not
       diketahui atau diestimasi oleh manajemen.                       known nor reasonably estimable by management.

   e. Transaksi dan Penjabaran Laporan Keuangan                   e.   Foreign     Currency      Transactions                      and
      dalam Mata Uang Asing                                            Translation of Financial Statements

        Dalam       menyiapkan    laporan     keuangan                 In preparing consolidated financial statements,
        konsolidasian,    Grup     mencatat     dengan                 the Group record by using the currency of the
        menggunakan mata uang dari lingkungan ekonomi                  primary economic environment where the entity
        utama di mana entitas beroperasi (“mata uang                   operates     (“the    functional     currency”).
        fungsional”). Mata uang fungsional Grup adalah                 The functional currency of the Group
        Rupiah (Rp).                                                   is Rupiah (Rp).

        Mata uang fungsional kantor cabang di Dubai,                   The functional currency of branch offices in Dubai,
        Malaysia dan Timor Leste, adalah Arab Emirat                   Malaysia and Timor Leste are Arab Emirat Dirham
        Dirham (AED), Saudi Arab Riyall (SAR), Ringgit                 (AED), Saudi Arab Riyall (SAR), Ringgit (MYR)
        (MYR) dan Dolar Amerika Serikat (USD). Untuk                   and United States Dollar (USD), respectively. For
        tujuan penyajian laporan keuangan konsolidasian,               presentation purposes of consolidated financial
        aset dan liabilitas Kantor cabang di Dubai dan Timor           statements, assets and liabilities of branches in
        Leste, pada tanggal laporan dijabarkan ke Rupiah               Dubai and Timor Leste at reporting date are
        (Rp) menggunakan kurs penutup yang berlaku pada                translated to Rupiah (Rp) at the closing rate at
        tanggal laporan posisi keuangan, sedangkan                     statement of financial position date, while
        pendapatan dan beban dijabarkan dengan                         revenues and expenses are translated using
        menggunakan kurs rata-rata. Untuk tujuan                       average rate for the period. For combining
        penggabungan, laporan keuangan kantor cabang                   purposes, the financial statements of the branch
        luar negeri dijabarkan dalam Rupiah (Rp) dengan                office are translated into Rupiah (Rp) based on
        kurs Reuters, sedangkan kantor cabang Malaysia                 Reuters Rate, while Malaysia and Timor Leste
        dan Timor Leste menggunakan mata uang Ringgit                  Branch maintained in Ringgit and United Stated
        dan Dolar Amerika Serikat (USD) dengan kurs Bank               Dollar (USD) using Bank Indonesia (BI) rate.
        Indonesia (BI). Selisih kurs yang dihasilkan diakui            All resulting exchange differences shall be
        dalam penghasilan komprehensif lain.                           recognized in other comprehensive income.

        Dalam penyusunan laporan keuangan setiap entitas               In preparing the financial statements of each
        individual grup, transaksi dalam mata uang asing               individual group entity, transactions in currencies
        selain mata uang fungsional entitas (mata uang                 other than the entity’s functional currency (foreign
        asing) diakui pada kurs yang berlaku pada tanggal              currencies) are recognized at the rates of
        transaksi. Pada akhir periode pelaporan, pos                   exchange      prevailing    at    the    dates     of
        moneter dalam mata uang asing dijabarkan ke                    the transactions. At the end of reporting period,
        dalam Rupiah (Rp) menggunakan kurs penutup,                    foreign currency monetary items are translated to
        yaitu kurs tengah BI pada tanggal 30 Juni 2023 dan             Rupiah (Rp) using the closing rate, i.e middle rate
        31 Desember 2022 sebagai berikut:                              of BI as of June 30, 2023 and December 31, 2022
                                                                       as follows:


                                                          35
Page 39
                                                                             The original consolidated financial statements included herein are in
                                                                                                                        the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                        PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                                  AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                    NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                              FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                     AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                            MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                                (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                    (Expressed in full Rupiah amount, unless otherwise stated)

                                                          30 Juni/             31 Desember/
                                                       June 30, 2023         December 31, 2022
                                                            Rp                        Rp

        Dolar Amerika Serikat (USD)                              15.026                     15.731                             U.S Dollar (USD)
        Dolar Singapura (SGD)                                    11.102                     11.659                      Singapore Dollar (SGD)
        Euro Eropa (EUR)                                         16.374                     16.713                        European Euro (EUR)
        Ringgit Malaysia (MYR)                                    3.213                      3.556                     Malaysian Ringgit (MYR)
        Riyal Arab Saudi (SAR)                                    4.006                      4.184                    Saudi Arabian Riyal (SAR)
        Yen Jepang (JPY)                                            105                        118                          Japanese Yen (JPY)

        Pos-pos non-moneter yang diukur pada nilai wajar                          Non-monetary items carried at fair value that
        dalam valuta asing dijabarkan kembali pada kurs                           are denominated in foreign currencies are
        yang berlaku pada tanggal ketika nilai wajar                              retranslated at the rates prevailing at the date
        ditentukan. Pos non-moneter yang diukur dalam                             when the fair value was determined. Non-
        biaya historis dalam valuta asing tidak dijabarkan                        monetary items that are measured in terms of
        kembali.                                                                  historical cost in a foreign currency are not
                                                                                  retranslated.

        Selisih kurs atas pos moneter diakui dalam laba rugi                      Exchange differences on monetary items
        pada periode saat terjadinya kecuali untuk:                               are recognized in profit or loss in the period in
                                                                                  which they arise except for:

         −        Selisih kurs atas pinjaman valuta asing yang                    −    Exchange differences on foreign currency
                  berkaitan dengan aset dalam konstruksi untuk                         borrowings relating to assets under
                  penggunaan yang produktif di masa depan,                             construction for future productive use, which
                  termasuk dalam biaya perolehan aset tersebut                         are included in the cost of those assets when
                  ketika dianggap sebagai penyesuaian atas                             they are regarded as an adjustment to interest
                  biaya bunga atas pinjaman valuta asing.                              costs on those foreign currency borrowing.
         −        Selisih kurs atas transaksi yang ditetapkan                     −    Exchange differences on transaction entered
                  untuk tujuan lindung nilai risiko valuta asing                       into in order to hedge certain foreign currency
                  tertentu.                                                            risks.
         −        Selisih kurs atas pos moneter piutang atau                      −    Exchange differences on monetary items
                  utang dari kegiatan usaha luar negeri yang                           receivable from or payable to a foreign
                  penyelesaiannya tidak direncanakan atau                              operation for which settlement is neither
                  tidak mungkin terjadi (membentuk bagian dari                         planned nor likely to occur (therefore forming
                  investasi bersih dalam kegiatan usaha luar                           part of the net investment in the foreign
                  negeri), yang pada awalnya diakui pada                               operation), which are recognized initially in
                  penghasilan       komprehensif     lain    dan                       other comprehensive income and reclassified
                  direklasifikasi dari ekuitas ke laba rugi pada                       from equity to profit or loss on repayment of the
                  pembayaran kembali pos moneter.                                      monetary items.

   f.   Transaksi dan Saldo dengan Pihak Berelasi                           f.    Related Party Transactions and Balances

        Pihak berelasi adalah orang atau entitas yang                             A related party is a person or an entity that
        terkait dengan entitas pelapor:                                           is related to the Group:

        a) Orang atau anggota keluarga dekatnya                                   a) A person or a close member of that person’s
           mempunyai relasi dengan entitas pelapor jika                              family is related to a reporting entity if that
           orang tersebut:                                                           person:

             i.   Memiliki pengendalian atau pengendalian                              i.   Has control or joint control over
                  bersama atas entitas pelapor;                                             the reporting entity;
             ii. Memiliki pengaruh signifikan atas entitas                             ii. Has significant influence over the reporting
                  pelapor; atau                                                             entity; or
             iii. Merupakan personil manajemen kunci                                   iii. Is a member of the key management
                  entitas pelapor atau entitas induk dari entitas                           personnel of the reporting entity or of
                  pelapor.                                                                  a parent of the reporting entity.




                                                                 36
Page 40
                                                                      The original consolidated financial statements included herein are in
                                                                                                                 the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                 PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                           AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                       FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                              AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                     MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                         (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)             (Expressed in full Rupiah amount, unless otherwise stated)

        b) Suatu entitas berelasi dengan entitas pelapor                   b) An entity is related to the reporting entity if any
           jika memenuhi salah satu hal berikut:                              of the following conditions applies:

           i.    Entitas dan entitas pelapor adalah anggota                    i.   The entity and the reporting entity
                 dari kelompok usaha yang sama (artinya                             are members of the same group (which
                 entitas induk, entitas anak, dan entitas anak                      means that each parent, subsidiary and
                 berikutnya saling berelasi dengan entitas                          fellow subsidiary is related to the others);
                 lain);
           ii. Satu entitas adalah entitas asosiasi atau                       ii. One entity is an associate or joint venture
                 ventura bersama dari entitas lain (atau                           of the other entity (or an associate or joint
                 entitas asosiasi atau ventura bersama yang                        venture of a member of a group of which
                 merupakan anggota suatu kelompok usaha,                           the other entity is a member);
                 yang mana entitas lain tersebut adalah
                 anggotanya);
           iii. Kedua entitas tersebut adalah ventura                          iii. Both entities are joint ventures of the same
                 bersama dari pihak ketiga yang sama;                               third party;
           iv. Satu entitas adalah ventura bersama dari                        iv. One entity is a joint venture of a third entity
                 entitas ketiga dan entitas yang lain adalah                        and the other entity is an associate of
                 entitas asosiasi dari entitas ketiga;                              the third entity;
           v. Entitas tersebut adalah suatu program                            v. The entity is a post-employment benefit
                 imbalan pasca kerja untuk imbalan kerja dari                       plan for the benefit of employees of either
                 salah satu entitas pelapor atau entitas yang                       the reporting entity, or an entity related to
                 terkait dengan entitas pelapor. Jika entitas                       the reporting entity. If the reporting entity is
                 pelapor       adalah        entitas       yang                     the entity that organized the plan,
                 menyelenggarakan program tersebut, maka                            the sponsoring employers are also related
                 entitas sponsor juga berelasi dengan entitas                       to the reporting entity;
                 pelapor;
           vi. Entitas yang dikendalikan atau dikendalikan                     vi. The entity is controlled or jointly controlled
                 bersama oleh orang yang diidentifikasi                            by a person identified in (a);
                 dalam huruf (a);
           vii. Orang yang diidentifikasi dalam huruf (a) (i)                  vii. A person identified in (a) (i) has significant
                 memiliki pengaruh signifikan atas entitas                           influence over the entity or is a member of
                 atau merupakan personil manajemen kunci                             the key management personnel of
                 entitas (atau entitas induk dari entitas); atau                     the entity (or a parent of the entity); or
           viii. Entitas, atau anggota dari kelompok yang                      viii. The entity, or any member of a group of
                 mana entitas merupakan bagian dari                                  which it is a part, provides key management
                 kelompok tersebut, menyediakan jasa                                 personnel services to the reporting entity or
                 personil manajemen kunci kepada entitas                             to the parent of the reporting entity.
                 pelapor atau kepada entitas induk dari
                 entitas pelapor.

        Entitas yang berelasi dengan Pemerintah adalah                     A Government-related entity is an entity that is
        entitas yang dikendalikan, dikendalikan bersama,                   controlled, jointly controlled or significantly
        atau dipengaruhi oleh Pemerintah. Pemerintah                       influenced by the government. Government refers
        mengacu kepada pemerintah, instansi Pemerintah                     to Government, Government agencies and similar
        dan badan yang serupa baik lokal, nasional                         bodies whether local, national or international.
        maupun internasional.

        Entitas yang berelasi dengan Pemerintah dapat                      Government-related entity can be an entity that is
        berupa entitas yang dikendalikan oleh Pemerintah                   controlled by the Government of Republic of
        Republik Indonesia melalui Kementerian BUMN                        Indonesia, represented by the BUMN’s Ministry as
        sebagai kuasa pemegang saham.                                      a shareholder’s representative.

        Transaksi signifikan yang dilakukan dengan pihak-                  Significant transactions with related parties,
        pihak berelasi, baik dilakukan dengan kondisi dan                  whether or not made at similar terms and
        persyaratan yang sama dengan pihak ketiga                          conditions as those done with third parties,
        maupun tidak, diungkapkan pada laporan                             are disclosed in the consolidated financial
        keuangan konsolidasian (Catatan 54).                               statements (Note 54).




                                                              37
Page 41
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

    g.   Aset Keuangan dan Liabilitas Keuangan                     g.   Financial Assets and Financial Liabilities

         Aset keuangan Grup terutama terdiri dari kas dan               The Group’s financial assets mainly consist of
         setara kas, piutang usaha, piutang retensi, piutang            cash and cash equivalents, accounts receivable,
         lain-lain, tagihan bruto kepada pengguna jasa dan              retention receivables, other receivables, gross
         aset keuangan atas proyek konsesi kepada                       amounts due from customers and financial assets
         pengguna.                                                      from concession project.
         Liabilitas keuangan Grup terutama terdiri dari utang           The Group’s financial liabilities mainly consist of
         usaha, utang bruto subkontraktor, utang bank,                  accounts payables, gross amount due to third
         utang lembaga keuangan non-bank, biaya yang                    parties, bank loans, loan to financial institution
         masih harus dibayar, surat utang jangka                        non-bank, accrued expenses, medium term
         menengah, utang obligasi, liabilitas jangka pendek             notes, bonds payable, other short-term liabilities
         lainnya dan utang lain-lain pada awalnya diukur                and other payables are initially measured at fair
         pada nilai wajar, setelah dikurangi biaya transaksi,           value, net of transaction costs, and subsequently
         dan selanjutnya diukur pada biaya perolehan yang               measured at amortized cost using the effective
         diamortisasi menggunakan metode suku bunga                     interest method.
         efektif.

         Instrumen Keuangan                                             Financial Instruments

         PSAK 71 menggantikan PSAK 55 “Instrumen                        PSAK 71 replaces PSAK 55 “Financial
         Keuangan: Pengakuan dan Pengukuran” dan                        Instruments: Recognition and Measurement” and
         memperkenalkan pengaturan baru untuk klasifikasi               introduces new requirements for classification and
         dan pengukuran instrumen keuangan berdasarkan                  measurement for financial instruments based on
         penilaian atas model bisnis dan arus kas                       business model and contractual cashflow
         kontraktual, pengakuan dan pengukuran cadangan                 assessment, recognition and measurement for
         kerugian penurunan nilai instrumen keuangan                    allowance for impairment losses for financial
         dengan menggunakan model kerugian kredit                       instruments using the expected credit loss model,
         ekspektasian, yang menggantikan model kerugian                 which replaced the incurred credit loss model and
         kredit yang terjadi serta memberikan pendekatan                also provides simplified approach to hedge
         yang lebih sederhana untuk akuntansi lindung nilai.            accounting.

         Sesuai dengan persyaratan transisi pada PSAK 71,               In accordance with the transition requirements in
         Grup memilih penerapan secara retrospektif                     PSAK 71, the Group elected to apply
         dengan dampak kumulatif pada awal penerapan                    retrospectively with the cumulative effect of initial
         diakui pada tanggal 1 Januari 2020 dan tidak                   implementation recognized at January 1,
         menyajikan kembali informasi komparatif. Grup                  2020 and not restate comparative information.
         telah melakukan penyesuaian pada saldo laba                    The Group has adjusted the beginning
         awal tahun 2020 sebesar Rp2.390.286.004.446                    2020     retained     earnings      amounting      to
         yang berasal dari kenaikan cadangan kerugian                   Rp2,390,286,004,446 which from increase in
         penurunan nilai instrumen keuangan.                            allowance for losses for financial instruments.

         Klasifikasi Aset dan Liabilitas Keuangan                       Classification         of    Financial        Assets        and
                                                                        Liabilities

         Sesuai dengan PSAK 71, terdapat tiga klasifikasi               In accordance with PSAK 71, there are three
         pengukuran aset keuangan:                                      measurement classifications for financial assets:
          i.    Biaya perolehan diamortisasi;                            i.    Amortized cost;
         ii.    Diukur pada nilai wajar melalui penghasilan             ii.    Fair value through other comprehensive
                komprehensif lain (FVOCI);                                     income (FVOCI);
         iii.   Diukur pada nilai wajar melalui laba rugi               iii.   Fair value through profit or loss (FVTPL).
                (FVTPL).

         Aset keuangan diklasifikasikan menjadi kategori                Financial assets are classified into these
         tersebut di atas berdasarkan model bisnis dimana               categories based on the business model within
         aset keuangan tersebut dimiliki dan karakteristik              which they are held and their contractual cash
         arus     kas    kontraktualnya.   Model     bisnis             flow characteristics. The business model reflects
         merefleksikan     bagaimana     kelompok      aset             how groups of financial assets are managed to
         keuangan dikelola untuk mencapai tujuan bisnis                 achieve a particular business objective.
         tertentu.

                                                           38
Page 42
                                                                  The original consolidated financial statements included herein are in
                                                                                                             the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                             PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                       AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                         NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                   FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                          AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                 MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                     (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)         (Expressed in full Rupiah amount, unless otherwise stated)

        i.    Aset keuangan dapat diukur dengan biaya                   i.    A financial asset is measured at amortized
              perolehan diamortisasi hanya jika memenuhi                      cost    only     if  it    meets    both    of
              kedua kondisi berikut dan tidak ditetapkan                      the following conditions and it is not
              sebagai FVTPL:                                                  designated as of FVTPL:
              − Aset keuangan dikelola dalam model                            − The financial assets is held within
                 bisnis yang bertujuan untuk memiliki aset                        a business model whose objective is to
                 keuangan untuk tujuan mendapatkan arus                           hold the asset to collect contractual cash
                 kas kontraktual (held to collect); dan                           flows (held to collect); and
              − Kriteria kontraktual dari aset keuangan                       − Its contractual terms give rise on
                 yang pada tanggal tertentu menghasilkan                          specified dates to cash flows that are
                 arus kas yang merupakan pembayaran                               solely payments of principal and interest
                 pokok dan bunga semata (SPPI – Solely                            (SPPI) on the principal amount
                 Payments of Principle and Interest) dari                         outstanding.
                 jumlah pokok terutang.

        ii.   Suatu instrumen utang diukur pada FVOCI,                 ii.    A debt instruments measured at FVOCI only
              hanya jika memenuhi kedua kondisi berikut                       if it meets both of the following conditions
              dan tidak ditetapkan sebagai FVTPL:                             and is not designated as of FVTPL:

              −   Aset keuangan dikelola dalam model                          − The financial asset is held within
                  bisnis yang tujuan tercapai dengan                            a business model whose objective
                  mendapatkan arus kas kontraktual dan                          is achieved by both collecting contractual
                  menjual aset keuangan (held to collect                        cash flows and selling the financial asset
                  and sell); dan                                                (held to collect and sell); and
              −   Kriteria kontraktual dari aset keuangan                     − Its contractual terms give rise on
                  yang menghasilkan arus kas yang                               specified dates to cash flows that are
                  merupakan pembayaran pokok dan bunga                          solely payments of principal and interest
                  semata dari jumlah pokok terutang.                            on the principal amount outstanding.

       iii.   Seluruh      aset   keuangan     yang tidak              iii.   All financial assets not classified as
              diklasifikasikan sebagai diukur dengan biaya                    measured at amortized cost or FVOCI as
              perolehan      diamortisasi   atau   FVOCI                      described above are measured at FVTPL.
              sebagaimana ketentuan di atas diukur
              dengan FVTPL.

        Aset dapat dijual dari portofolio hold to collect              Assets may be sold out of hold to collect
        ketika terdapat peningkatan risiko kredit.                     porotfolios where there is an increase in credit
        Penghentian untuk alasan lain diperbolehkan                    risk. Disposals for other reasons are permitted but
        namun jumlah penjualan tersebut harus tidak                    such sales should be insignificant in value or
        signifikan jumlahnya atau tidak sering.                        infrequent in nature.

        Laba rugi yang belum direalisasi atas aset                     Unrealized gains or losses of financial assets held
        keuangan yang diklasifikasikan sebagai FVOCI                   at FVOCI deferred in other comprehensive
        ditangguhkan di pendapatan komprehensif lain                   income until the asset is derecognized.
        sampai aset tersebut dihentikan.

        Aset keuangan dapat ditetapkan sebagai FVTPL                   Financial assets may be designated at FVTPL
        hanya jika ini dapat mengeliminasi atau                        only if doing so eliminates or reduces accounting
        mengurangi accounting mismatch.                                mismatch

        Penilaian Apakah Arus Kas Kontraktual Hanya                    Assessment of Whether Contractual Cash
        Merupakan Pembayaran Pokok dan Bunga                           Flows are Solely Payments of Principal and
        Semata                                                         Interest

        Untuk tujuan penilaian ini, pokok didefinisikan                For the purposes of this assessment, principle is
        sebagai nilai wajar dari aset keuangan pada                    defined as the fair value of the financial asset on
        pengakuan awal. Bunga didefinisikan sebagai                    initial recognition. Interest is defined as
        imbalan untuk nilai waktu atas uang dan untuk                  consideration for the time value of money and for
        risiko kredit yang terkait dengan jumlah pokok yang            the credit risk associated with the principal
        terutang selama periode waktu tertentu dan untuk               amount outstanding during a particular period of
        risiko dan biaya pinjaman dasar lainnya (misalnya              time and for other basic lending risks and costs


                                                          39
Page 43
                                                                     The original consolidated financial statements included herein are in
                                                                                                                the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                          AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                      FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                             AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                    MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                        (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)            (Expressed in full Rupiah amount, unless otherwise stated)

        risiko likuiditas dan biaya administrasi), serta marjin           (e.g. liquidity risk and administrative costs), as
        keuntungan.                                                       well as profit margin.

        Dalam menilai apakah arus kas kontraktual adalah                  In assessing whether the contractual cash flows
        SPPI, Perusahaan mempertimbangkan ketentuan                       are SPPI, the Company considers the contractual
        kontraktual instrumen tersebut. Hal ini termasuk                  terms of the instrument. This includes assessing
        menilai apakah aset keuangan mengandung                           whether the financial asset contains a contractual
        ketentuan kontraktual yang dapat mengubah waktu                   term that could change the timing or amount of
        atau jumlah arus kas kontraktual sehingga tidak                   contractual cash flows such that it would not meet
        memenuhi kondisi ini. Dalam melakukan penilaian,                  this condition. In making the assessment,
        Perusahaan mempertimbangkan:                                      the Company considers:

        −   Kejadian kontijensi yang akan mengubah                        −    Contingent events that would change
            jumlah dan waktu arus kas;                                         the amount and timing of cash flows;
        −   Fitur leverage;                                               −    Leverage features;
        −   Persyaratan     pelunasan dipercepat        dan               −    Prepayment and extension terms;
            perpanjangan fasilitas;
        −   Ketentuan yang membatasi klaim Perusahaan                     −    Terms that limit the Company’s claim to cash
            atas arus kas dari aset tertentu (seperti                          flows from specified assets (e.g. non-recourse
            pinjaman non-recourse); dan                                        loans); and
        −   Fitur yang memodifikasi imbalan dari nilai waktu              −    Features that modify consideration of
            atas uang (seperti penepatan ulang suku bunga                      the time value of money (e.g. periodical reset
            berkala).                                                          of interest rates).

        Penilaian Model Bisnis                                            Business Model Assessment

        Model bisnis mengacu pada bagaimana aset                          Business model refers to how financial assets are
        keuangan dikelola bersama untuk menghasilkan                      managed together to generate cash flows for
        arus kas untuk Perusahaan. Arus kas mungkin                       the Company. This may be collecting contractual
        dihasilkan dengan menerima arus kas kontraktual,                  cash flows, selling financial assets or both.
        menjual aset keuangan atau keduanya. Model                        Business models are determined at a level of
        bisnis ditentukan pada tingkat agregasi di mana                   aggregation where groups of assets are managed
        kelompok aset dikelola bersama untuk mencapai                     together to achieve a particular objective and do
        tujuan tertentu dan tidak bergantung pada niat                    not depend on management's intentions for
        manajamen pada instrumen individual.                              individual instruments.

        Perusahaan menilai model bisnis pada aset                         The Company assesses the business model of
        keuangan setidaknya pada tingkat lini bisnis atau                 financial assets at least at business line level or
        pada di mana terdapat variasi mandat/tujuan dalam                 where there are various mandates or objectives
        lini bisinis, pada lini bisnis produk atau pada tingkat           within a business line, at a more granular product
        desk yang lebih granular (misalnya sub-portofolio                 business line or desk level (i.e. sub-portfolios or
        atau sub-lini bisnis).                                            sub-business lines).

        Penentuan model bisnis dilakukan dengan                           Business model determinations are made
        mempertimbangkan semua bukti relevan yang                         considering all relevant evidence that is available
        tersedia pada tanggal penilaian. Ini termasuk,                    at the date of the assessment. This includes, but
        tetapi tidak terbatas pada:                                       is not limited to:

        −   Bagaimana kinerja bisnis dan aset keuangan                    −    How the performance of the business and
            yang ada di dalam unit bisnis itu dievaluasi dan                   the financial assets held within that business
            dilaporkan kepada manajemen. Tingkat                               unit are evaluated and reported to
            pemisahan yang diidentifikasi PSAK 71 harus                        management. The level of segregation
            konsisten dengan bagaimana portofolio aset                         identified for PSAK 71 classification should be
            dipisahkan dan dilaporkan kepada manajemen;                        consistent with how asset portfolios are
                                                                               segregated      and   reported      to   senior
                                                                               management.

        −   Risiko yang mempengaruhi kinerja unit bisnis                  −    The risks that affect the performance of
            dan aset keuangan yang dimiliki dalam unit                         the business unit and the financial assets held
            bisnis itu dan khususnya bagaimana risiko itu                      within that business unit and in particular
            dikelola; dan                                                      the way those risks are managed; and

                                                             40
Page 44
                                                                    The original consolidated financial statements included herein are in
                                                                                                               the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                               PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                         AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                           NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                     FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                            AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                   MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                       (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)           (Expressed in full Rupiah amount, unless otherwise stated)

        −   Bagaimana manajer unit bisnis dikompensasi                   −    How managers of the business unit
            (misalnya, apakah kompensasi didasarkan                           are compensated (for example, whether
            pada nilai wajar dari aset yang dikelola atau                     the compensation is based on the fair value of
            pada arus kas kontraktual yang dikumpulkan).                      the assets managed or on the contractual
                                                                              cash flows collected).

        Penentuan model bisnis dilakukan berdasarkan                     Business model determinations are made on
        skenario yang diperkirakan akan terjadi oleh                     the basis of scenarios that the Company
        Perusahaan dan tidak dalam kondisi sangat                        reasonably expects to occur and not under highly
        tertekan atau kondisi terburuk. Jika aset dijual                 stressed or 'worst case' conditions. Where assets
        dalam kondisi yang tidak diharapkan oleh                         are disposed of under conditions that
        Perusahaan untuk berlaku ketika aset diakui,                     the Company did not reasonably expect to prevail
        klasifikasi aset keuangan yang ada dalam                         when      the     assets     were      recognized,
        portofolio tidak disajikan secara tidak akurat, tetapi           the classification of existing financial assets in
        kondisi tersebut harus dipertimbangkan untuk aset                the portfolio are not rendered inaccurate but
        yang diperoleh di masa mendatang.                                the conditions in question should be considered
                                                                         for any assets acquired going forward.

        Perubahan pada model bisnis atau pengenalan                      Changes to business models or the introduction of
        model bisnis baru ditentukan melalui proses                      new business models are determined through
        persetujuan unit bisnis baru.                                    the new business unit approval process.

        Grup dapat mereklasifikasi seluruh aset keuangan                The Group can reclassify all of its financial assets
        yang terpengaruh jika dan hanya jika, model bisnis              when and only, its business model for managing
        untuk pengelolaan aset keuangan berubah.                        those financial assets changes.

        Pengakuan                                                       Recognition

        Semua aset dan liabilitas keuangan lainnya pada                 All other financial assets and liabilities are initially
        awalnya diakui pada tanggal pengakuan di mana                   recognized on the trade date at which
        Perusahaan menjadi suatu pihak dalam ketentuan                  the Company becomes a party to the contractual
        kontraktual instrumen tersebut.                                 provisions of the instruments.

        Pada saat pengakuan awal, aset keuangan atau                    A financial asset or financial liability is initially
        liabilitas keuangan diukur pada nilai wajar                     measured at fair value plus/less (for an item not
        ditambah/dikurangi (untuk item yang tidak diukur                subsequently measured at fair value through profit
        pada nilai wajar melalui laba rugi setelah                      or loss) transaction costs that are directly
        pengakuan awal) biaya transaksi yang dapat                      attributable to the acquisition of a financial asset or
        diatribusikan secara langsung atas perolehan                    issuance of a financial liability. The subsequent
        aset keuangan atau penerbitan liabitas keuangan.                measurement of financial assets and financial
        Pengukuran aset keuangan dan liabilitas                         liabilities depends on their classification.
        keuangan         setelah      pengakuan     awal
        tergantung pada klasifikasi aset keuangan dan
        liabilitas keuangan tersebut.

        Biaya transaksi hanya meliputi biaya-biaya yang                 Transaction costs include only those costs that
        dapat diatribusikan secara langsung untuk                       are directly attributable to the acquisition of
        perolehan suatu aset keuangan atau penerbitan                   a financial asset or issuance of a financial liability
        suatu liabilitas keuangan dan merupakan biaya                   and are incremental costs that would not have
        tambahan yang tidak akan terjadi apabila                        been incurred if the instrument had not been
        instrumen keuangan tersebut tidak diperoleh atau                acquired or issued.
        diterbitkan.

        Aset keuangan yang diukur pada nilai wajar melalui              Financial assets carried at fair value through profit
        laporan laba rugi pada awalnya dicatat sebesar                  or loss are initially recognized at fair value and
        nilai wajar dan biaya transaksinya dibebankan                   transaction costs are expensed in the profit or loss.
        pada laporan laba rugi. Aset keuangan tersedia                  Available-for-sale financial assets, FVOCI and
        untuk dijual, FVOCI dan aset keuangan yang diukur               financial assets at fair value through profit or loss
        pada nilai wajar melalui laporan laba rugi                      are subsequently carried at fair value.
        selanjutnya dicatat sebagai nilai wajar.


                                                            41
Page 45
                                                                    The original consolidated financial statements included herein are in
                                                                                                               the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                               PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                         AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                           NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                     FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                            AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                   MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                       (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)           (Expressed in full Rupiah amount, unless otherwise stated)

        Untuk liabilitas keuangan, biaya transaksi                      For financial liabilities, transaction costs
        dikurangkan dari jumlah utang yang diakui pada                  are deducted from the amount of debt initially
        pengakuan awal liabilitas. Biaya transaksi tersebut             recognized. Such transactions costs are amortized
        diamortisasi selama umur instrumen berdasarkan                  over the terms of the instruments based on
        metode suku bunga efektif dan dicatat sebagai                   the effective interest rate method and are recorded
        bagian dari beban bunga.                                        as part of interest expense.

        Pengukuran Biaya Perolehan Diamortisasi                         Amortized Cost Measurement

        Biaya perolehan diamortisasi dari aset keuangan                 The amortized cost of a financial asset or financial
        atau liabilitas keuangan adalah jumlah aset atau                liability is the amount at which the financial asset
        liabilitas keuangan yang diukur pada saat                       or liability is measured at initial recognition, less
        pengakuan awal, dikurangi pembayaran pokok,                     principal repayments, plus or less the cumulative
        ditambah atau dikurangi dengan amortisasi                       amortisation using the effective interest method of
        kumulatif dengan menggunakan metode suku                        any difference between the initial amount
        bunga efektif yang dihitung dari selisih antara nilai           recognized and the maturity amount and minus
        awal dan nilai jatuh temponya dan dikurangi                     any allowance for impairment losses.
        cadangan kerugian penurunan nilai.

        Kerugian penurunan nilai dilaporkan sebagai                     The impairment loss is reported as a deduction
        pengurang dari nilai tercatat dari aset keuangan                from the carrying value of the financial assets
        dalam kelompok biaya perolehan diamortisasi, dan                classified as amortized cost and recognized in
        diakui di dalam laporan laba rugi konsolidasian                 the consolidated statement of profit or loss as
        sebagai kerugian penurunan nilai aset keuangan.                 impairment losses on financial assets.

        Tingkat suku bunga efektif adalah suku bunga yang               The effective interest rate is the rate that exactly
        secara tepat mendiskontokan estimasi arus kas di                discounts the estimated future cash flows through
        masa datang selama perkiraan umur dari aset                     the expected life of the financial asset or financial
        keuangan atau liabilitas keuangan (atau jika lebih              liability (or, where appropriate, a shorter period) to
        tepat, digunakan periode lain yang lebih singkat)               the net carrying amount at initial recognition. When
        untuk memperoleh nilai tercatat bersih pada saat                calculating the effective interest rate, the Company
        pengakuan awal. Pada saat menghitung tingkat                    estimates future cash flows considering all
        suku bunga efektif, Perusahaan mengestimasi arus                contractual terms of the financial instrument.
        kas di masa datang dengan mempertimbangkan
        seluruh persyaratan kontraktual dalam instrumen
        keuangan tersebut.

        Pengukuran Nilai Wajar                                          Fair Value Measurement

        Nilai wajar adalah harga yang akan diterima untuk               Fair value is the price that would be received to sell
        menjual suatu aset atau harga yang akan dibayar                 an asset or paid to transfer a liability in an orderly
        untuk mengalihkan suatu liabilitas dalam transaksi              transaction between market participants at
        teratur (orderly transaction) antara pelaku pasar               the measurement date in the principal market or,
        (market participants) pada tanggal pengukuran di                in its absence, the most advantageous market to
        pasar utama atau, jika tidak terdapat pasar utama,              which the Group has access at that date.
        di pasar yang paling menguntungkan dimana Grup
        memiliki akses pada tanggal tersebut.

        Jika tersedia, Grup mengukur nilai wajar instrumen              When available, the Group measures the fair value
        keuangan dengan menggunakan harga kuotasian                     of a financial instrument using the quoted price in
        di pasar aktif untuk instrumen tersebut. Suatu pasar            an active market for that instrument. A market is
        dianggap aktif jika transaksi atas aset dan liabilitas          regarded as active if transactions for the asset or
        terjadi dengan frekuensi dan informasi penentuan                liability take place with sufficient frequency and
        harga secara berkelanjutan.                                     volume to provide pricing information on an
                                                                        ongoing basis.

        Bukti terbaik atas nilai wajar instrumen keuangan               The best evidence of the fair value of a financial
        pada saat pengakuan awal adalah harga transaksi,                instrument at initial recognition is normally
        yaitu nilai wajar dari pembayaran yang diberikan                the transaction price, i.e., the fair value of
        atau diterima. Jika Grup menetapkan bahwa nilai                 the consideration given or received. If the Group
        wajar pada pengakuan awal berbeda dengan                        determines that the fair value at initial recognition

                                                            42
Page 46
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

        harga transaksi dan nilai wajar tidak dapat                    differs from the transaction price and the fair value
        dibuktikan dengan harga kuotasian di pasar aktif               is evidenced neither by a quoted price in an active
        untuk aset atau liabilitas yang identik atau                   market for an identical asset or liability nor based
        berdasarkan teknik penilaian yang hanya                        on a valuation technique that uses only data from
        menggunakan data dari pasar yang dapat                         observable markets, then the financial instrument
        diobservasi, maka nilai wajar instrumen keuangan               is initially measured at fair value, adjusted to defer
        pada saat pengakuan awal disesuaikan untuk                     the difference between the fair value at initial
        menangguhkan perbedaan antara nilai wajar pada                 recognition      and     the     transaction    price.
        saat pengakuan awal dan harga transaksi. Setelah               Subsequently, that difference is recognized in
        pengakuan awal, perbedaan tersebut diakui dalam                profit or loss on an appropriate basis over the life
        laba rugi berdasarkan umur dari instrumen tersebut             of the instrument but no later than when
        namun tidak lebih lambat dari saat penilaian                   the valuation is wholly supported by observable
        tersebut didukung sepenuhnya oleh pasar yang                   market data, or the transaction is closed out.
        dapat diobservasi atau saat transaksi ditutup.

        Penghentian Pengakuan                                          Derecognition

        Grup menghentikan pengakuan aset keuangan                      The Group derecognizes a financial asset when
        pada saat hak kontraktual atas arus kas yang                   the contractual rights to the cash flows from
        berasal dari aset keuangan tersebut kadaluwarsa                the financial asset expire, or when it transfers
        atau Perusahaan mentransfer seluruh hak untuk                  the rights to receive the contractual cash flows on
        menerima arus kas kontraktual dari aset keuangan               the financial asset in a transaction in which
        dalam transaksi dimana Perusahaan secara                       substantially all the risks and rewards of ownership
        substansial telah mentransfer seluruh risiko dan               of the financial asset are transferred. Any interest
        manfaat atas kepemilikan aset keuangan yang                    in transferred financial assets that is created or
        ditransfer. Setiap hak atau liabilitas atas aset               retained by the Group is recognized as a separate
        keuangan yang ditransfer yang timbul atau yang                 asset or liability.
        masih dimiliki oleh Grup diakui sebagai aset atau
        liabilitas secara terpisah.

        Dalam transaksi dimana Grup secara substansial                 In transactions in which the Group neither retains
        tidak memiliki atau tidak mentransfer seluruh risiko           nor transfers substantially all the risks and rewards
        dan manfaat atas kepemilikan aset keuangan,                    of ownership of a financial asset, the Group
        Grup menghentikan pengakuan aset tersebut jika                 derecognizes the asset if it does not retain control
        Grup tidak lagi memiliki pengendalian atas aset                over the asset. The rights and obligations retained
        tersebut. Hak dan kewajiban yang masih dimiliki                in the transfer are recognized separately as assets
        dalam transfer tersebut diakui secara terpisah                 and liabilities as appropriate. In transfers in which
        sebagai aset atau liabilitas. Dalam transfer dimana            control over the asset is retained, the Group
        pengendalian atas aset masih dimiliki, Grup tetap              continues to recognise the asset to the extent of its
        mengakui aset yang ditransfer tersebut sebesar                 continuing involvement, determined by the extent
        keterlibatan    keberlanjutan,    dimana      tingkat          to which it is exposed to changes in the value of
        keberlanjutan Perusahaan dalam aset yang                       the transferred asset.
        ditransfer adalah sebesar perubahan nilai aset
        yang ditransfer.

        Grup menghapusbukukan aset keuangan dan                        The Group writes off a financial asset and any
        cadangan kerugian penurunan nilai terkait, pada                related allowance for impairment losses, when the
        saat Grup menentukan bahwa aset keuangan                       Group determines that the financial asset is
        tersebut tidak dapat ditagih seluruhnya.                       completely uncollectible.

        Saling Hapus                                                   Offsetting

        Aset    keuangan      dan     liabilitas  keuangan             Financial assets and liabilities are offset and
        disalinghapuskan dan jumlah netonya dilaporkan                 the net amount is reported in the consolidated
        pada laporan posisi keuangan konsolidasian ketika              statement of financial position when there is a
        terdapat hak yang berkekuatan hukum untuk                      legally    enforceable      right     to    offset
        melakukan saling hapus atas jumlah yang telah                  the recognized amounts and there is an intention
        diakui tersebut dan adanya niat untuk                          to settle on a net basis, or realize
        menyelesaikan liabilitas secara bersamaan. Hak                 the asset and settle the liability simultaneously.
        saling hapus tidak kontinjen atas peristiwa di masa            The legally enforceable right must not be
        depan dan dapat dipaksakan secara hukum dalam                  contingent on future events and must be

                                                           43
Page 47
                                                                    The original consolidated financial statements included herein are in
                                                                                                               the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                               PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                         AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                           NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                     FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                            AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                   MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                       (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)           (Expressed in full Rupiah amount, unless otherwise stated)

        situasi bisnis yang normal dan dalam peristiwa                  enforceable    in the  normal  course of
        gagal bayar, atau peristiwa kepailitan atau                     business and in the event of default in
        kebangkrutan Perusahaan atau pihak lawan.                       solvency or bankruptcy or the Company or
                                                                        the counterparty.

        Pendapatan dan beban disajikan dalam jumlah                     Income and expenses are presented on a net
        bersih hanya jika diperkenankan oleh standar                    basis only when permitted by accounting
        akuntansi.                                                      standards.

        Identifikasi dan         Pengukuran        Kerugian              Identification  and                  Measurement              of
        Penurunan Nilai                                                  Impairment Losses

        PSAK 71 mengharuskan cadangan kerugian diakui                   PSAK 71 requires a loss allowance to be
        sebesar kerugian kredit ekspektasian 12 bulan (12-              recognized at an amount equal to either 12-
        month ECL) atau kerugian kredit ekspektasian                    month or lifetime Expected Credit Losses (ECLs).
        sepanjang umur aset keuangan (lifetime ECL).                    Lifetime ECLs are the ECLs that result from all
        Lifetime ECL adalah kerugian kredit ekspektasian                possible default events over the expected life of a
        yang berasal dari semua kemungkinan kejadian                    financial instrument, whereas 12-month ECLs
        gagal bayar sepanjang umur ekspektasian suatu                   are the portion of ECLs that result from default
        instrumen keuangan, sedangkan ECL 12 bulan                      events that are possible within the 12 months after
        adalah porsi dari kerugian kredit ekspektasian yang             reporting date.
        berasal dari kemungkinan kejadian gagal bayar
        dalam 12 bulan setelah tanggal pelaporan.

        Kerugian kredit ekspektasian atau ECL diakui                    ECLs are recognized for all account receivables
        untuk seluruh instrumen piutang usaha dan                       and financial guarantees that are classified as hold
        jaminan keuangan yang diklasifikasikan sebagai                  to collect/hold to collect and sell and have cash
        hold to collect/hold to collect and sell dan memiliki           flows that are solely payments of principal and
        arus kas SPPI. Kerugian kredit ekspektasian tidak               interest. Expected credit losses are not recognized
        diakui untuk instrumen ekuitas yang ditetapkan                  for equity instruments designated at FVOCI.
        sebagai FVOCI.

        Model ECL yang digunakan Perusahaan adalah                      The ECL model used by the Company is a model
        model yang menggunakan matriks probability of                   that uses a probability of default (PD) matrix which
        default (PD) yang didiskontokan dengan                          is discounted using the effective interest rate.
        menggunakan suku bunga efektif. Probabilitas                    The probability at a point in time that a
        yang timbul di suatu waktu dimana debitur                       counterparty will default, calibrated over up to 12
        mengalami gagal bayar, dikalibrasikan sampai                    months from the reporting date (Stage 1) or over
        dengan 12 bulan setelah tanggal pelaporan (stage                the lifetime of the product (Stage 2 and 3) and
        1) atau sepanjang umur (Stage 2 dan 3) dan                      incorporating the impact of forward-looking
        digabungkan pada dampak asumsi ekonomi masa                     economic assumptions that have an effect on
        depan yang memiliki risiko kredit. PD diestimasikan             credit risk. PD is estimated at a point in time that
        pada point in time dimana hal ini berfluktuasi                  means it will fluctuate in line with the economic
        sejalan dengan siklus ekonomi.                                  cycle.

        Kerugian     Kredit    Ekspektasian      12    Bulan            12   Months             Expected          Credit        Losses
        (Stage 1)                                                       (Stage 1)

        Kerugian kredit ekspektasian diakui pada saat                   Expected credit losses are recognized at
        pengakuan awal instrumen keuangan dan                           the time of initial recognition of a financial
        merepresentasikan kekurangan kas sepanjang                      instrument and represent the lifetime cash
        umur aset yang timbul dari kemungkinan gagal                    shortfalls arising from possible default events up to
        bayar di masa yang akan datang dalam kurun                      twelve months after the reporting date. Expected
        waktu 12 bulan setelah tanggal pelaporan.                       credit losses continue to be determined on this
        Kerugian kredit ekspektasian terus ditentukan oleh              basis until there is either a significant increase in
        dasar ini sampai timbul peningkatan risiko kredit               the credit risk of an instrument or the instrument
        yang signifikan pada instrumen tersebut atau                    becomes credit impaired. If an instrument is no
        instrumen tersebut telah mengalami penurunan                    longer considered to exhibit a significant increase
        nilai kredit. Jika suatu Instrumen tidak lagi dianggap          in credit risk, expected credit losses will revert to
        menunjukkan peningkatan risiko kredit yang                      being determined on a twelve month basis after
        signifikan, maka kerugian kredit ekspektasian                   the reporting date.

                                                            44
Page 48
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

        dihitung kembali berdasarkan basis 12 bulan
        setelah tanggal pelaporan.

        Peningkatan Risiko Kredit yang Signifikan                      Significant Increase in Credit Risk (Stage 2)
        (Stage 2)

        Jika aset keuangan mengalami peningkatan risiko                If a financial asset experiences a significant
        kredit yang signifikan sejak pengakuan awal,                   increase in credit risk since initial recognition, an
        kerugian kredit ekspektasian diakui atas kejadian              expected credit loss provision is recognized for
        gagal bayar yang mungkin terjadi sepanjang umur                default    events     that     may      occur    over
        aset. Peningkatan signifikan dalam risiko kredit               the lifetime of the asset. Significant increase in
        dinilai dengan membandingkan risiko gagal bayar                credit risk is assessed by comparing the risk of
        atas eksposur pada tanggal pelaporan dengan                    default of an exposure at the reporting date to the
        risiko gagal bayar saat pengakuan awal (setelah                risk of default at origination (after taking into
        memperhitungkan perjalanan waktu dari akun                     account the passage of time). Significant does not
        tersebut). Signifikan tidak berarti signifikan secara          mean statistically significant nor is assessed in the
        statistik, juga tidak dinilai dalam konteks perubahan          context of changes in expected credit loss.
        dalam cadangan kerugian kredit ekspektasian.

        Eksposur yang Mengalami Penurunan Nilai                        Credit Impaired (or Defaulted) Exposures
        Kredit atau Gagal Bayar (Stage 3)                              (Stage 3)

        Aset keuangan yang mengalami penurunan nilai                   Financial assets that are credit impaired (or in
        (atau gagal bayar) merupakan aset yang                         default) represent those that are at least 420 days
        setidaknya telah memiliki tunggakan lebih dari 420             past due after the reporting date. Financial assets
        hari setelah tanggal pelaporan. Aset keuangan                  are also considered to be credit impaired where
        juga dianggap mengalami penurunan nilai kredit                 the debtors are unlikely to pay on the occurrence
        dimana debitur kemungkinan besar tidak akan                    of one or more observable events that have
        membayar dengan terjadinya satu atau lebih                     a detrimental impact on the estimated future cash
        kejadian yang teramati yang memiliki dampak                    flows of the financial asset. Loss provisions
        menurunkan jumlah estimasi arus kas masa depan                 against credit impaired financial assets are
        dari aset keuangan tersebut. Cadangan kerugian                 determined based on an assessment of the
        penurunan nilai terhadap aset keuangan yang                    recoverable cash flows under a range of
        mengalami        penurunan      nilai     ditentukan           scenarios, including the realization of any
        berdasarkan penilaian terhadap arus kas yang                   collateral held where appropriate. The ECL will
        dapat dipulihkan berdasarkan sejumlah skenario,                reflect weighted average of the scenarios based
        termasuk realisasi jaminan yang dimiliki jika                  on the probability of the relevant scenario to occur.
        memungkinkan. ECL akan mencerminkan rata-rata                  The      loss     provisions      held     represent
        tertimbang dari skenario berdasarkan probabilitas              the difference between the present value of
        dari skenario yang relevan untuk terjadi. Cadangan             the cash flows expected to be recovered,
        kerugian penurunan nilai merupakan selisih antara              discounted at the instruments original effective
        nilai sekarang dari arus kas yang diperkirakan akan            interest rate, and the gross carrying value of
        dipulihkan, didiskontokan pada suku bunga efektif              the instrument prior to any credit impairment.
        awal, dan nilai tercatat bruto instrumen sebelum
        penurunan nilai kredit.

        Periode yang diperhitungkan ketika mengukur                     The period considered when measuring expected
        kerugian kredit ekspektasian adalah periode yang                credit loss is the shorter of the expected life and
        lebih pendek antara umur ekspektasian dan                       the contractual term of the financial asset.
        periode kontrak aset keuangan. Umur ekspektasian                The expected life may be impacted by
        dapat dipengaruhi oleh pembayaran dimuka dan                    prepayments and the maximum contractual term
        periode kontrak maksimum           melalui   opsi               by extension options.
        perpanjangan kontrak.

        Untuk aset yang diukur pada biaya perolehan                     For assets measured at amortized cost,
        diamortisasi, saldo di laporan posisi keuangan                  the consolidated statement of financial position
        konsolidasian mencerminkan aset bruto dikurangi                 amount reflects the gross asset less the expected
        kerugian kredit ekspektasian. Untuk instrumen                   credit losses. For debt instruments held at FVOCI,
        utang dalam kategori FVOCI, saldo di laporan                    the consolidated statement of financial position
        posisi keuangan konsolidasian mencerminkan nilai                amount reflects the instruments fair value, with
        wajar dari instrumen, dengan cadangan kerugian                  the expected credit loss allowance held as a

                                                           45
Page 49
                                                                  The original consolidated financial statements included herein are in
                                                                                                             the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                             PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                       AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                         NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                   FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                          AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                 MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                     (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)         (Expressed in full Rupiah amount, unless otherwise stated)

         kredit ekspektasian dibukukan terpisah sebagai                separate reserve within other comprehensive
         cadangan pada pendapatan komprehensif lain.                   income.

         Untuk menentukan kerugian kredit ekspektasian                 To determine the expected credit loss, these
         komponen-komponen ini akan diperhitungkan                     components are multiplied together and
         secara bersama-sama dan didiskontokan ke                      discounted to the reporting date using
         tanggal laporan keuangan menggunakan diskonto                 the effective interest rate as the discount rate.
         berdasarkan suku bunga efektif.

    h. Kas dan Setara Kas                                         h. Cash and Cash Equivalents

         Kas dan setara kas termasuk kas, kas di bank                  Cash and cash equivalents are cash on hand,
         (rekening giro), dan deposito berjangka yang jatuh            cash in banks (demand deposits) and time
         tempo dalam jangka waktu tiga bulan atau kurang               deposits with maturity periods of three months or
         pada saat penempatan yang tidak digunakan                     less at the time of placement that are not used as
         sebagai      jaminan     atau     tidak   dibatasi            collateral or are not restricted.
         penggunaannya.

         Rekening yang dibatasi penggunaannya dan atau                 Current accounts which are restricted and or used
         digunakan sebagai jaminan diklasifikasi sebagai               as security are classified as current assets when
         bagian aset lancar jika jatuh temponya kurang dari            the maturities are less than 12 months after
         12 bulan setelah akhir periode pelaporan.                     the end of reporting period.

    i.   Investasi Jangka Pendek                                  i.   Short-Term Investment

         Deposito berjangka yang jatuh temponya kurang                 Time deposits with maturity of less than three
         dari tiga bulan pada saat penempatan namun                    months from the date of placement and pledged
         dijaminkan, atau telah ditentukan penggunaannya               as collateral, or restricted and time deposits with
         dan deposito berjangka yang jatuh temponya lebih              maturity of more than three months from the date
         dari tiga bulan setelah tanggal penempatan                    of placement is presented as short-term
         disajikan sebagai investasi jangka pendek.                    investment. The time deposits are presented
         Deposito berjangka disajikan berdasarkan nilai                using par value.
         nominal.

    j.   Piutang Retensi                                          j.   Retention Receivables

         Piutang retensi merupakan piutang Grup kepada                 Retention receivable represents the Group’s
         pemberi kerja yang akan dilunasi setelah                      receivable from the owner of the project which will
         penyelesaian kontrak atau pemenuhan kondisi                   be paid after completion of the contract or
         yang ditentukan kontrak. Piutang retensi dicatat              fulfillment of certain conditions in the contract.
         pada saat pemotongan sejumlah persentase                      Retention receivable is recorded at certain
         tertentu dari setiap tagihan termin untuk ditahan             percentage applied in every account receivable’s
         oleh pemberi kerja sampai suatu kondisi setelah               claim which is retained by the owner of the project
         penyelesaian kontrak dipenuhi.                                up to certain condition after completion of
                                                                       the contract has been met.

    k. Tagihan Bruto kepada Pengguna Jasa                         k.   Gross Amount Due from Customers

         Tagihan bruto kepada pemberi kerja merupakan                  Gross amount due from customers represents
         piutang Grup yang berasal dari pekerjaan kontrak              the Group’s receivable originated from
         konstruksi yang dilakukan namun pekerjaan yang                construction contract in progress. Gross amount
         dilakukan masih dalam pelaksanaan. Tagihan bruto              due from customers is presented as the net
         disajikan sebesar selisih antara biaya yang terjadi           amount of costs incurred plus recognized profits,
         ditambah laba yang diakui dikurangi dengan                    minus the sum of recognized losses and progress
         kerugian yang diakui dan termin.                              billings.

         Tagihan bruto diakui sebagai pendapatan sesuai                Gross amount due from customers is recognized
         dengan metode persentase penyelesaian yang                    as revenue based on the percentage of
         dinyatakan dalam berita acara penyelesaian                    completion method which is stated on
         pekerjaan, dimana faktur belum dapat ditagihkan               the certificate of work completion, while the
         karena perbedaan antara tanggal berita acara                  invoice is still unbilled due to the difference

                                                          46
Page 50
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

        kemajuan (progress) fisik dengan pengajuan                      between the date of physical progress certificates
        penagihan pada tanggal laporan posisi keuangan                  and the submission of billing on the consolidated
        konsolidasian.                                                  statement of financial position date.

    l. Biaya Dibayar Dimuka                                        l.   Prepaid Expenses

        Biaya dibayar dimuka merupakan biaya yang telah                 Prepaid expenses are in costs that have been paid
        dibayar namun pembebanannya baru akan                           but will be incurred future periods, such as prepaid
        dilakukan pada periode yang akan datang, seperti                insurance premiums, prepaid interest and rent
        premi asuransi dibayar dimuka, bunga dibayar                    paid in advance. Prepaid expenses are amortized
        dimuka, dan sewa dibayar dimuka. Biaya dibayar                  over the periods of benefit using the straight-line
        dimuka diamortisasi sesuai dengan masa                          method.
        manfaatnya dengan menggunakan metode garis
        lurus.

   m. Persediaan                                                   m. Inventories

        Persediaan dinyatakan berdasarkan jumlah                        Inventories are carried at the lower of cost and net
        terendah antara biaya perolehan dan nilai realisasi             realizable value. The cost of inventories
        neto. Biaya perolehan terdiri dari seluruh biaya lain           comprises all costs incurred in bringing
        yang timbul sampai persediaan berada dalam                      the inventories to their present location and
        kondisi dan lokasi saat ini. Biaya perolehan                    condition. Cost is determined using first-in first-out
        ditentukan dengan metode masuk pertama keluar                   method (FIFO). Net realizable value is
        pertama (FIFO). Nilai realisasi neto merupakan                  the estimated selling price in the ordinary course
        taksiran harga jual dalam kegiatan usaha biasa                  of business minus the estimated costs of
        dikurangi estimasi biaya penyelesaian dan estimasi              completion and the estimated costs necessary to
        biaya yang diperlukan untuk membuat penjualan.                  make the sale.The cost of precast inventories
        Biaya persediaan produk pracetak terdiri dari                   comprises of cost of purchases, cost of
        seluruh biaya pembelian, biaya konversi, tenaga                 conversion, direct labor and attributable
        kerja langsung, dan biaya overhead produksi                     production overheads based on normal levels of
        berdasarkan tingkat aktivitas normal.                           activity.

        Sebelum tahun 2021 Grup mengakui biaya                          Prior to 2021, Group recognized the cost of
        persediaan terdiri dari seluruh biaya pembelian,                inventories consisting of all purchase costs,
        biaya konversi, biaya tenaga kerja langsung dan                 conversion costs, direct labor costs and
        biaya overhead produksi berdasarkan tingkat                     production overhead costs based on normal
        aktivitas normal.                                               activity levels.

        Pada tahun 2021 Grup mengganti metode biaya                     In 2021, the Group will replaced the inventory cost
        persediaan yaitu menggunakan teknik pengukuran                  method by using the inventory cost measurement
        biaya persediaan dengan metode biaya standar.                   technique with the standard cost method.
        Beban varians dari biaya standar merupakan                      The variance of standard costs is an evaluation of
        evaluasi atas jumlah normal atau tidak normal atas              the normal or abnormal amount of wasted
        pemborosan biaya produksi. Selanjutnya beban                    production costs. Furthermore, the variance
        varians dari persediaan dikeluarkan dari beban                  expense from inventories is removed from
        persediaan dan diakui sebagai beban usaha dalam                 the cost of inventories and recognized as
        periode terjadinya meliputi:                                    operating expenses in the period in which they are
                                                                        incurred, including:

         a.   Jumlah yang tidak normal atas pemborosan                   a. Abnormal amounts of wasted materials, labor
              bahan, tenaga kerja atau biaya produksi                       or other production costs.
              lainnya.
         b.   Biaya penyimpanan kecuali biaya tersebut                   b. Storage costs unless these costs are needed
              diperlukan dalam proses produksi sebelum                      in the production process before proceeding
              dilanjutkan pada tahap produksi selanjutnya.                  to the next stage of production.
         c.   Biaya administrasi dan umum yang tidak                     c. General and administrative expenses that do
              memberikan konstribusi untuk membuat                          not contribute to keeping the inventory in its
              persediaan berada dalam kondisi dan lokasi                    current state and location.
              saat ini.
         d.   Biaya penjualan.                                           d. Sales costs



                                                           47
Page 51
                                                                    The original consolidated financial statements included herein are in
                                                                                                               the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                             PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                       AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                         NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                   FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                          AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                 MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                     (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

        Grup mencatat perubahan kebijakan akuntansi                        The Group recorded for the changes in accounting
        tersebut dengan menerapkan perubahan secara                        policy by applying the changes retrospectively.
        retrospektif.

        Persediaan tanah kavling untuk usaha sarana                        Inventory of plots of land for housing facilities
        perumahan dinilai dengan menggunakan harga beli                    business are assessed using the acquisition cost
        ditambah dengan biaya lain-lain yang dikeluarkan                   plus other expenditures incurred to make the land
        sampai dengan tanah tersebut siap dijual                           ready for sale (with certificate).
        (bersertifikat).

        Persediaan material dinyatakan sebesar nilai yang                  Material inventories and precast inventories
        lebih rendah antara harga perolehan dengan nilai                   are stated at the lower of the cost or net realizable
        realisasi bersih dan persediaan precast pun                        value.
        menggunakan metode yang sama.

        Penyisihan penurunan nilai persediaan diakui                       Allowance for decline in value of inventories
        berdasarkan kondisi fisik persediaan dan                           is recognized based on physical conditions of
        persediaan yang bergerak lambat dengan                             the inventories and slow-moving inventories
        mempertimbangkan manfaat masa depan dan nilai                      taking into account future benefits and net
        realisasi bersih.                                                  realizable value.

   n.   Aset Tetap                                                 n.      Fixed Assets

        Aset    tetap dipertanggungjawabkan dengan                         Fixed assets are accounted for using cost model
        menggunakan model biaya dan dinyatakan                             and is stated based on acquisition cost minus
        berdasarkan biaya perolehan setelah dikurangi                      the accumulated depreciation and accumulated
        akumulasi penyusutan. Aset tetap, kecuali tanah,                   impairment losses, if any. Fixed assets, except for
        disusutkan dengan metode saldo menurun ganda                       land, are depreciated using the double-declining
        dan garis lurus (untuk gedung dan bangunan).                       method and straight-line method (for plants and
                                                                           buildings).

        Aset tetap tanah dan bangunan dinyatakan                           Land and buildings are stated at their revalued
        berdasarkan nilai revaluasi yang merupakan nilai                   amounts, being the fair value at the date of
        wajar pada tanggal revaluasi dikurangi akumulasi                   revaluation, less any subsequent accumulated
        penyusutan dan akumulasi rugi penurunan nilai                      depreciation and subsequent accumulated
        yang terjadi setelah tanggal revaluasi. Revaluasi                  impairment losses. Revaluation is made with
        dilakukan dengan keteraturan yang memadai untuk                    sufficient regularity to ensure that the carrying
        memastikan bahwa jumlah tercatat tidak berbeda                     amount does not differ materially from
        secara material dari jumlah yang ditentukan dengan                 the amount determined using fair value at
        menggunakan nilai wajar pada tanggal laporan.                      the reporting date.

        Kenaikan yang berasal dari revaluasi tanah dan                     Any     revaluation     increase      arising      on
        bangunan diakui pada penghasilan komprehensif                      the revaluation of such land and buildings is
        lain dan terakumulasi dalam ekuitas pada bagian                    recognized in other comprehensive income and
        surplus revaluasi, kecuali sebelumnya penurunan                    accumulated in equity under revaluation surplus,
        revaluasi atas aset yang sama pernah diakui dalam                  except to the extent that it reverses a revaluation
        laba rugi, dalam hal ini kenaikan revaluasi hingga                 decrease, for the same asset which was
        sebesar penurunan nilai aset akibat revaluasi                      previously recognized in profit or loss, in this case
        tersebut, dikreditkan dalam laba rugi. Penurunan                   the increase is credited to profit or loss to
        jumlah tercatat yang berasal dari revaluasi tanah                  the extent of the decrease previously charged.
        dan bangunan dibebankan dalam laba rugi apabila                    A decrease in carrying amount arising on
        penurunan tersebut melebihi saldo surplus                          the revaluation of such land and buildings is
        revaluasi aset yang bersangkutan, jika ada.                        charged to profit or loss to the extent that it
                                                                           exceeds the balance, if any.

        Aset tetap tanah tidak disusutkan. Sedangkan aset                  Fixed asset lands are not depreciated. While
        tetap gedung disusutkan dengan metode garis lurus                  building    assets     are  depreciated     using
        selama masa manfaat aset tersebut, sebagai                         the straight line method based on their estimated
        berikut:                                                           useful lives, as follows:

                                                          Masa Manfaat/
                                                          Useful Lives

        Gedung dan Pabrik                                 20 Tahun/ Year                                           Buildings and Plant


                                                          48
Page 52
                                                                       The original consolidated financial statements included herein are in
                                                                                                                  the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                          AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                      FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                             AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                    MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                        (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)              (Expressed in full Rupiah amount, unless otherwise stated)

         Aset tetap kecuali tanah dan bangunan dinyatakan                   Fixed assets except for land and buildings are
         berdasarkan biaya perolehan dikurangi akumulasi                    accounted for using cost less accumulated
         penyusutan, dan akumulasi penurunan nilai jika                     depreciation and accumulated impairment losses,
         ada, dan disusutkan dengan menggunakan metode                      if there is any, and depreciated using the double
         saldo menurun berganda selama taksiran masa                        declining method based on the estimated useful
         manfaat ekonomis aset tetap sebagai berikut:                       life of the fixed assets as follows:
                                                           Masa Manfaat/
                                                           Useful Lives

        Kendaraan                                           8 Tahun/ Year                                                       Vehicles
        Perlengkapan Kantor                               2 - 8 Tahun/ Year                                              Office Supplies
        Peralatan Proyek                                  4 - 16 Tahun/ Year                                          Project Equipment

         Beban pemeliharaan dan perbaikan dibebankan                           The cost of maintenance and repairs is charged
         pada laporan laba rugi pada saat terjadinya. Biaya-                   to profit or loss as incurred. Other costs incurred
         biaya lain yang terjadi selanjutnya yang timbul untuk                 subsequently to add to, replace part of, or service
         menambah, mengganti atau memperbaiki aset                             an item of property, plant and equipment, are
         tetap dicatat sebagai biaya perolehan aset jika dan                   recognized as asset if, and only if it is probable
         hanya jika besar kemungkinan manfaat ekonomis di                      that future economic benefits associated with the
         masa depan berkenaan dengan aset tersebut akan                        item will flow to the entity and the cost of the item
         mengalir ke entitas dan biaya perolehan aset dapat                    can be measured reliably.
         diukur secara andal.

         Jumlah      tercatat    aset    tetap    dihentikan                   The carrying amount of fixed assets
         pengakuannya pada saat dilepaskan atau saat tidak                     is derecognized upon disposal or when no future
         ada manfaat ekonomis masa depan yang                                  economic benefits are expected from its use or
         diharapkan dari penggunaan atau pelepasannya.                         disposal. Any profit or loss arising on
         Laba atau rugi yang timbul dari penghentian                           derecognition of the asset (calculated as
         pengakuan aset (dihitung sebagai perbedaan                            the difference between the net disposal proceeds
         antara jumlah neto hasil pelepasan dan jumlah                         and the carrying amount of the asset) is included
         tercatat dari aset) dimasukkan dalam laba rugi pada                   in the profit or loss for the period when the assets
         periode aset tersebut dihentikan pengakuannya.                        are derecognized.

         Pada akhir periode/ tahun buku pelaporan, Grup                        At the end of reporting period the Group
         melakukan penelaahan berkala atas masa manfaat                        periodically reviews the useful lives of the assets,
         ekonomis aset, nilai residu, metode penyusutan,                       asset’s residual value, depreciation method and
         dan sisa umur pemakaian berdasarkan spesifikasi                       the remaining usage expectation based on
         teknis.                                                               technical specification.

         Aset dalam penyelesaian dinyatakan sebesar biaya                      Construction in progress is stated at cost and will
         perolehan, dan akan dipindahkan ke aset tetap                         be reclassified to the respective fixed assets
         pada saat sudah selesai pembangunannya dan siap                       when completed and ready to use.
         digunakan.

   o.    Properti Investasi                                           o.       Investment Properties

         Properti investasi adalah properti (tanah atau                        Investment properties are properties (land or
         bangunan atau bagian dari suatu bangunan atau                         a building or part of a building or both) held by
         kedua-duanya) yang dikuasai oleh pemilik atau                         the owner or the lessee under a finance lease to
         penyewa melalui sewa pembiayaan untuk                                 earn rentals or for capital appreciation or both,
         menghasilkan sewa atau untuk kenaikan nilai atau                      rather than for use in the production or supply of
         kedua-duanya, dan tidak untuk digunakan dalam                         goods or services or for administrative purposes;
         produksi atau penyediaan barang atau jasa atau                        or sale in daily business activities.
         untuk tujuan administratif; atau dijual dalam
         kegiatan usaha sehari-hari.

         Properti investasi diakui sebagai aset jika dan hanya                 Investment property is recognized as an asset
         jika besar kemungkinan manfaat ekonomi masa                           when, and only when it is probable that the future
         depan yang terkait dengan properti investasi akan                     economic benefits that are associated with
         mengalir ke entitas; dan biaya perolehan properti                     the investment property will flow to the entity; and
         investasi dapat diukur dengan andal.                                  the cost of the investment property can be
                                                                               measured reliably.



                                                           49
Page 53
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

        Properti investasi pada awalnya diukur sebesar                   An investment property shall be measured initially
        biaya perolehan, meliputi harga harga pembelian                  at its cost, which comprises its purchase price
        dan setiap pengeluaran yang dapat diatribusikan                  and any directly attributable expenditure
        secara langsung (biaya jasa hukum, pajak                         (professional fees for legal services, property
        pengalihan properti dan biaya transaksi lain). Biaya             transfer taxes and other transaction costs).
        transaksi termasuk dalam pengukuran awal                         Transaction costs are included in the initial
        tersebut.                                                        measurement.

        Setelah    pengakuan      awal,    Grup    memilih              After initial recognition, the Group chooses to use
        menggunakan model nilai wajar dan mengukur                      fair value model and measure all of its investment
        seluruh properti investasi berdasarkan nilai wajar.             property at fair value. A gain or loss arising from
        Keuntungan atau kerugian yang timbul dari                       a change in the fair value of investment property
        perubahan nilai wajar properti investasi diakui                 is recognized in profit or loss for the period in
        dalam laba rugi pada periode terjadinya.                        which it arises.

        Penentuan nilai wajar investasi didasarkan pada                 The fair value of investment property is based on
        penilaian oleh penilai independen yang mempunyai                a valuation by an independent appraiser who
        kualifikasi profesional yang telah diakui dan relevan           holds a recognized and relevant professional
        serta memiliki pengalaman terkini di lokasi dan                 qualification and has recent experience in
        kategori properti investasi yang dinilai.                       the location and category of the investment
                                                                        property being valued.

        Pengalihan ke properti investasi dilakukan, jika dan            The transfer to investment property is made,
        hanya jika, terdapat perubahan penggunaan yang                  if and only if, there is a change in use, evidenced
        ditunjukkan dengan berakhirnya pemakaian oleh                   by the end of owner-occupation and
        pemilik dan dimulainya sewa operasi kepada pihak                commencement of an operating lease to another
        lain.                                                           party.

        Pengalihan dari properti investasi dilakukan, jika              The transfer from investment property is made,
        dan hanya jika, terdapat perubahan penggunaan                   if and only if, there is a change in use, evidenced
        yang ditunjukkan dengan dimulainya penggunaan                   by the commencement of owner-occupation and
        oleh pemilik dan dimulainya pengembangan untuk                  commencement of development with a view to
        dijual.                                                         sell.

        Properti investasi dihentikan pengakuannya pada                 An investment property is derecognized on
        saat dilepaskan atau ketika tidak digunakan lagi                disposal or when the investment property
        secara permanen dan tidak memiliki manfaat                      is permanently withdrawn from use and no future
        ekonomi masa depan yang diperkirakan dari                       economic benefits are expected from its disposal.
        pelepasannya. Keuntungan atau kerugian yang                     Gains or losses arising from the retirement or
        timbul dari penghentian atau pelepasan ditentukan               disposal are determined as the difference
        dari selisih antara hasil neto pelepasan dan jumlah             between the net disposal proceeds and
        tercatat aset, dan diakui dalam laba rugi pada                  the carrying amount of the asset, and
        periode terjadinya penghentian atau pelepasan.                  are recognized in profit or loss in the period of
                                                                        the retirement or disposal.

   p.   Aset Lain-lain                                             p.   Other Assets

        Akun-akun yang tidak dapat digolongkan dalam                    Accounts that cannot be classified into current
        aset lancar, investasi, maupun aset tidak berwujud              assets, investment, or intangible assets
        disajikan dalam aset lain-lain.                                 are presented as other assets.

        Beban tangguhan berupa hak atas tanah dicatat                   Deferred expense such as land right is recorded
        sebesar biaya perolehan hak atau biaya                          at cost of acquisition or cost of renewal right.
        pembaharuan hak. Semua beban tangguhan terkait                  All deferred expense of right is amortized over
        hak diamortisasi sepanjang umur hukum hak atau                  useful life or economic life of land, whichever is
        umur ekonomis aset tanah, yang mana yang lebih                  shorter.
        pendek.




                                                          50
Page 54
                                                                    The original consolidated financial statements included herein are in
                                                                                                               the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                               PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                         AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                           NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                     FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                            AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                   MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                       (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)           (Expressed in full Rupiah amount, unless otherwise stated)

   q.   Perjanjian Konsesi Jasa                                     q.   Service Concession Arrangement

        Grup telah menerapkan ISAK 16, “Perjanjian                       The Group has adopted ISAK 16, “Service
        Konsesi Jasa” (ISAK 16) dan ISAK 22, “Perjanjian                 Concession Arrangement” (ISAK 16) and
        Konsesi Jasa Pengungkapan” (ISAK 22).                            ISAK 22, “Service Concession Arrangement:
                                                                         Disclosure” (ISAK 22).

        ISAK 16 mengatur prinsip umum dalam pengakuan                    ISAK 16 determines the general principles in
        dan pengukuran hak dan kewajiban terkait dengan                  the recognition and measurement of rights and
        perjanjian konsesi jasa. ISAK 16 mengatur bahwa                  liabilities related to service concession
        infrastruktur tidak diakui sebagai aset tetap operator           arrangement. ISAK 16 regulates that an operator
        (pihak penerima konsesi jasa) karena perjanjian                  (concession right beneficiary) does not recognize
        jasa kontraktual tidak memberikan hak kepada                     any infrastructure assets because the contractual
        operator untuk mengendalikan penggunaan                          service arrangement does not convey the right to
        infrastruktur jasa publik. Operator memiliki akses               control the use of the public service infrastructure
        untuk     mengoperasikan       infrastruktur    dalam            to the operator. The operator has access to
        menyediakan jasa publik untuk kepentingan                        operate the infrastructure to provide public
        pemberi konsesi sesuai dengan persyaratan yang                   service on behalf of the grantor in accordance
        ditentukan dalam kontrak.                                        with the terms specified in the contract.

        ISAK 22 memberikan panduan spesifik mengenai                     ISAK 22 provides specific guidance for
        pengungkapan yang diperlukan atas perjanjian                     the required disclosures regarding the service
        konsesi jasa.                                                    concession arrangement.

        Grup membukukan perjanjian konsesi jasa sebagai                  The Group accounts for its service concession
        model aset tak berwujud karena memiliki hak                      arrangement under the intangible asset
        (lisensi) untuk membebankan pengguna jasa publik.                model as it receives the right (license) to charge
        Pada saat pengakuan awal, aset konsesi dicatat                   users of public service. At initial recognition,
        pada nilai wajar dari imbalan yang diterima atau                 concession assets are recorded at the fair value
        akan diterima. Aset konsesi ini adalah aset hak                  of the benefit received or to be received. These
        pengelolaan jalan tol yang akan diamortisasi selama              concession assets are toll road concession rights
        sisa masa hak konsesi sejak tanggal pengoperasian                which will be amortized over the remaining
        ruas jalan tol. Selama masa konstruksi, akumulasi                concession period from the date of operation of
        biaya perolehan dan konstruksi jalan tol diakui                  the toll road. During the construction period,
        sebagai aset konsesi dalam penyelesaian.                         the accumulated toll road construction cost is
        Amortisasi mulai dibebankan pada saat aset                       recognized as concession assets in progress.
        konsesi tersebut siap digunakan.                                 The amortization of the cost starts when
                                                                         the concession assets are ready to be operated.

        Aset konsesi akan dihentikan pengakuannya pada                   The concession assets are derecognized at
        saat berakhirnya masa konsesi. Tidak akan ada                    the end of the concession period. There will be no
        keuntungan atau kerugian saat penghentian                        gain or loss upon derecognition as the concession
        pengakuan karena aset konsesi diharapkan telah                   assets which are expected to be fully amortized
        diamortisasi secara penuh, akan diserahkan                       by then, will be handed over to the Badan
        kepada Badan Pengatur Jalan Tol (BPJT)                           Pengatur Jalan Tol (BPJT) with no consideration.
        tanpa syarat.

        Aset konsesi yang diberikan kepada Grup dapat                    Concession assets granted to the Group
        dipindahkan dengan persetujuan Pemerintah/BPJT.                  are     transferrable    with    approval    from
        Aset    konsesi     ini   akan    diserahkan     ke              the Government /BPJT. These concession right
        Pemerintah/BPJT pada saat akhir masa konsesi                     assets will be transferred to the Government/
        dan, pada saat itu, seluruh akun yang berhubungan                BPJT at the end of the concession period and, at
        dengan     aset      konsesi    akan     dihentikan              that time, all accounts related to the concession
        pengakuannya.                                                    rights assets will be derecognized.

        Selama periode hak pengusahaan jalan tol, aset                   During the toll road concession rights period,
        hak pengusahaan jalan tol dapat dikeluarkan dari                 the concession rights assets may be
        laporan posisi keuangan konsolidasian Grup jika                  derecognized from the consolidated statement of
        jalan tol diserahkan (dikuasakan) kepada pihak lain              financial position of the Group if the toll road is
        atau Pemerintah/BPJT mengubah status jalan tol                   transferred to another party or the Government
        menjadi jalan non-tol atau tidak ada manfaat                     /BPJT changes the status of the toll road to non-
        ekonomi       yang     dapat    diharapkan     dari              toll road or if there is no economic benefit
        penggunaannya. Keuntungan atau kerugian yang                     expected from usage of the toll road. Gain or loss

                                                           51
Page 55
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

        timbul dari penghentian atau pelepasan aset                     from the discontinuance or disposal of concession
        konsesi diakui sebagai keuntungan atau kerugian                 assets is recognized in the consolidated
        dalam laporan laba rugi konsolidasian dan                       statement of profit or loss and other consolidated
        penghasilan komprehensif lain konsolidasian.                    comprehensive income.

        Selain itu, Grup mengakui dan mengukur                          In addition, the Group recognizes and measures
        pendapatan konstruksi sesuai dengan PSAK 72                     construction revenues in accordance with PSAK
        “Pendapatan dari Kontrak dengan Pelanggan”.                     72, “Revenue from Contracts with Customers”.
        Ketika Grup menyediakan jasa konstruksi atau                    When the Group provides construction services
        peningkatan kemampuan, imbalan yang diterima                    or upgrades services, the consideration received
        atau akan diterima oleh Grup diakui pada nilai wajar.           or to be received by the Group is recognized at its
                                                                        fair value.

        Kontrak konstruksi meliputi seluruh biaya konstruksi            Construction contract comprises all the amounts
        pembangunan jalan tol atau peningkatan kapasitas                of toll road construction costs or toll road capacity
        jalan tol yang meliputi pengadaan tanah, studi                  improvement consisting of land acquisition cost,
        kelayakan dan biaya-biaya lain yang berhubungan                 feasibility study cost and other costs that
        langsung dengan pembangunan jalan tol, termasuk                 are directly attributable to the toll road
        biaya pembangunan jalan akses ke jalan tol, jalan               construction, including construction costs for
        alternatif dan fasilitas jalan umum yang disyaratkan,           access roads, alternative roads and required
        ditambah biaya pinjaman lain yang secara langsung               public road facilities, interest and other borrowing
        maupun tidak langsung digunakan untuk mendanai                  costs, either directly or indirectly used for
        proses pembangunan aset tersebut. Biaya                         financing the development of assets. These costs
        pinjaman dikapitalisasi sampai dengan saat proses               are capitalized until the construction is completed
        pembangunan tersebut telah selesai dan aset                     and the concession assets are ready to be
        konsesi telah siap untuk dioperasikan.                          operated.

        Grup mengakui biaya jasa konstruksi dan                         The Group recognizes construction services and
        peningkatan kemampuan aset konsesi sebagai aset                 increased capacity of concession asset as
        tak berwujud dimana Grup menerima hak (lisensi)                 intangible assets in which the Group receives
        untuk membebankan pengguna jasa publik. Suatu                   the rights (license) to charge users of public
        hak untuk membebankan pengguna jasa publik                      services. A right to charge users of public services
        bukan merupakan hak tanpa syarat untuk menerima                 is not an unconditional right to receive cash
        kas karena jumlahnya bergantung pada sejauh                     because the amounts depend on the extent of the
        mana publik menggunakan jasa. Selama periode                    public using the service. During the construction
        konstruksi, Grup mencatat aset tak berwujud dan                 period, the Group records intangible assets, and
        mengakui pendapatan dan biaya konstruksi sesuai                 recognizes revenues and costs of construction in
        dengan kontraknya. Biaya konstruksi merupakan                   accordance to the contract. Construction cost is
        nilai dari jumlah perolehan kontrak konstruksi.                 the value of acquisition of a construction contract.

        Biaya bunga dan biaya pinjaman lainnya, seperti                 Interests and other borrowing costs, such as
        diskonto baik yang secara langsung ataupun tidak                discount fees on loans either directly or indirectly
        langsung digunakan untuk mendanai proses                        used in financing the construction of a qualifying
        pembangunan aset kualifikasian (qualifying assets),             asset, are capitalized up to the date when
        dikapitalisasi sampai saat proses pembangunannya                the construction is completed. For borrowings
        selesai. Untuk pinjaman yang dapat dihubungkan                  directly attributable to a qualifying asset,
        secara langsung dengan suatu aset tertentu, jumlah              the amount allowed to be capitalized
        yang dapat dikapitalisasi adalah sebesar biaya                  is determined as the actual borrowing costs
        pinjaman yang terjadi dalam periode berjalan,                   incurred during the period, less any investment
        dikurangi dengan penghasilan investasi sementara                income earned from the temporary investment of
        dari pinjaman tersebut.                                         such borrowings.

        Provisi Pelapisan Jalan Tol                                     Provision for Toll Road Overlay

        Dalam pengoperasian jalan tol, Grup mempunyai                   In operating toll roads, the Group is obligated to
        kewajiban untuk menjaga kualitas sesuai dengan                  maintain quality in accordance with the SPM
        Standar Pelayanan Minimum (SPM)yang ditetapkan                  (Minimum Service Standards) established by
        oleh Kementerian Pekerjaan Umum Republik                        the Ministry of Public Works of the Republic of
        Indonesia, yaitu antara lain dengan melakukan                   Indonesia, i.e., by perfoming toll road overlay
        pelapisan ulang jalan tol secara berkala. Biaya                 regularly. The cost of this overlay is periodically
        pelapisan ini akan dicadangkan secara berkala                   provided based on estimated utilization of toll road
        berdasarkan estimasi penggunaan jalan tol oleh                  by customers. The estimated net provision for toll

                                                          52
Page 56
                                                                  The original consolidated financial statements included herein are in
                                                                                                             the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                             PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                       AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                         NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                   FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                          AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                 MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                     (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)         (Expressed in full Rupiah amount, unless otherwise stated)

        pelanggan. Provisi pelapisan ulang jalan tol diukur            road overlay is discounted to its present value that
        dengan nilai kini atas estimasi manajemen terhadap             reflects management estimates against cost
        pengeluaran yang diperlukan untuk menyelesaikan                incurred to settle current provision.
        liabilitas kini.

        Aset jalan tol terdiri dari jalan dan jembatan,                Toll road assets consisting of roads and bridges,
        gerbang dan bangunan pelengkap jalan tol dan                   gates and complementary building toll roads and
        sarana pelengkap jalan tol dicatat sebagai aset hak            toll supplementary facilities are recorded as toll
        pengusahaan jalan tol yang dinyatakan sebesar                  road concession rights which are stated at fair
        nilai wajar pada tanggal revaluasian dikurangi                 value at the revaluation date less accumulated
        akumulasi penyusutan dan akumulasi rugi                        depreciation and accumulated impairment losses
        penurunan nilai yang terjadi setelah tanggal                   that occur after the date of revaluation.
        revaluasi.

        Amortisasi aset jalan dan jembatan dilakukan                   Amortization of asset roads and bridges
        dengan menggunakan metode unit produksi (jumlah                is calculated using the unit of production
        lalu lintas kendaraan kendaraan) selama masa hak               (the amount of vehicle traffic vehicles) during
        pengusahaan jalan tol (masa konsesi). Sedangkan                the period of the concession (concession period).
        aset hak pengusahaan jalan tol selain jalan dan                While the toll road concession rights assets other
        jembatan diamortisasi selama periode yang lebih                than roads and bridges are amortized over
        pendek antara masa hak pengusahaan jalan tol                   the shorter period between the period of
        (masa konsesi) dan umur manfaat aset.                          concession (concession period) and the useful life
                                                                       of the asset.

        Aset tak berwujud dihentikan pengakuannya jika                 Intangible assets are derecognized when
        dilepas atau ketika tidak terdapat lagi manfaat                removed or when there are no further future
        ekonomi masa depan yang diperkirakan dari                      economic benefits are expected from its use or
        penggunaannya atau pelepasannya. Keuntungan                    disposal. Gains or losses arising from
        atau kerugian yang muncul dari penghentian                     derecognition of an intangible asset is determined
        pengakuan aset tak berwujud ditentukan sebagai                 as the difference between the net disposal
        selisih antara hasil neto pelepasan (jika ada) dan             proceeds (if any) and the carrying amount of
        jumlah tercatat aset. Keuntungan atau kerugian                 assets. Gains or losses are recognized in profit or
        diakui dalam laba rugi ketika aset tersebut                    loss when the asset is derecognized. Gains or
        dihentikan pengakuannya. Keuntungan atau                       loses are recognized as other income.
        kerugian diakui sebagai pendapatan lain-lain.

   r.   Penurunan       Aset     Non-Keuangan        kecuali      r.   Impairment of Non-Financial Assets except
        Goodwill                                                       Goodwill

        Kebijakan akuntansi untuk penurunan nilai aset                 The accounting policy for impairment of financial
        keuangan dijelaskan dalam Catatan 2g; penurunan                assets is discussed in Note 2g; while impairment
        nilai untuk goodwill dijelaskan dalam Catatan 2x.              for goodwill is discussed in Note 2x.

   s.   Aset Keuangan dari Perjanjian Jasa Konsesi                s.   Financial Asset from Service Concession
                                                                       Arrangements

        WSE menerapkan ISAK 16 “Perjanjian Konsesi                     WSE applies ISAK 16 “Service Concession
        Jasa” atas Perjanjian Jual Beli Listrik (PPA) dengan           Arrangements” on its Power Purchase Agreement
        PT Perusahaan Listrik Negara (Persero) (PLN).                  (PPA) with PT Perusahaan Listrik Negara
                                                                       (Persero) (PLN).

        Perjanjian konsesi jasa adalah perjanjian dimana               Service          concession            arrangements
        pemerintah atau badan lainnya (pemberi konsesi)                are arrangements whereby a government or
        memberikan kontrak untuk penyediaan layanan                    another body (the “grantor”) grants contracts for
        publik ke entitas sektor swasta (“operator”).                  the supply of public services to a private sector
        Perjanjian tersebut sering disebut sebagai                     entity (the “operator”). This is often referred to as
        perjanjian 'publik-ke-swasta'.                                 a 'public-to-private' arrangement.

        Dalam perjanjian ini, operator membangun                       In this type of arrangement, an operator
        infrastruktur  yang akan digunakan untuk                       constructs the infrastructure that will be used to
        menyediakan jasa publik dan mengoperasikan serta               provide the public service and operates and
        mengelola infrastruktur tersebut untuk jangka waktu            maintains that infrastructure for a specified period


                                                          53
Page 57
                                                                  The original consolidated financial statements included herein are in
                                                                                                             the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                             PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                       AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                         NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                   FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                          AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                 MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                     (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)         (Expressed in full Rupiah amount, unless otherwise stated)

        tertentu. Operator dibayar untuk jasa yang                     of time. The operator is paid for the services over
        dibayarkan selama periode perjanjian. Perjanjian               the period of the arrangement. A contract sets out
        diatur oleh suatu kontrak yang menetapkan standar              performance standards, pricing mechanisms, and
        kinerja, mekanisme penyesuaian harga, dan                      arrangements for arbitrating disputes. In some
        pengaturan untuk menengahi perselisihan. Dalam                 cases, the operator may upgrade the existing
        beberapa kasus, operator dapat meningkatkan                    infrastructure.
        infrastruktur yang ada.

        Beberapa ciri umum dari perjanjian konsesi jasa                Some common features of service concession
        meliputi:                                                      arrangements include:

        •    Pemberi konsesi merupakan entitas sektor                   •      The grantor is a public sector entity,
             publik, termasuk badan pemerintah, atau                           including a governmental body, or a private
             entitas sektor swasta yang telah diberikan                        sector entity to which the responsibility for
             tanggung jawab atas layanan tersebut.                             the service has been devolved.
        •    Operator bertanggung jawab setidaknya atas                 •      The operator is responsible for at least
             sebagian pengelolaan infrastruktur dan jasa                       some       of     the      management      of
             terkait dan tidak hanya bertindak sebagai agen                    the infrastructure and related services and
             atas kepentingan pemberi konsesi.                                 does not merely act as an agent on behalf
                                                                               of the grantor.
        •    Kontrak menetapkan harga awal yang akan                    •      The contract sets the initial prices to be
             dikenakan oleh operator dan mengatur                              levied by the operator and regulates price
             perubahan harga selama periode perjanjian                         revisions over the period of the service
             jasa.                                                             arrangement.
        •    Operator diwajibkan untuk menyerahkan                      •      The operator is obligated to hand over
             infrastruktur kepada pemberi konsesi pada                         the infrastructure to the grantor in a
             akhir periode perjanjian dalam kondisi yang                       specified condition at the end of the period
             telah ditentukan, dengan sedikit atau tanpa                       of the arrangement, for little or no
             imbalan tambahan, terlepas dari pihak yang                        incremental consideration irrespective of
             awalnya mendanai infrastruktur.                                   which party initially financed it.

        Perjanjian Jual Beli Listrik (PPA) yang diungkapkan            The Power Purchase Agreement (PPA) disclosed
        pada Catatan 57 antara PLN dan WSE memenuhi                    in Note 57 between PLN and WSE meets
        definisi sebagai perjanjian konsesi jasa dimana PLN            the definition of a service concession
        bertindak sebagai pemberi konsesi dan WSE                      arrangement, where PLN acts as a grantor and
        bertindak sebagai operator. WSE setuju untuk                   WSE acts as the operator. WSE agrees to design,
        merancang, membiayai, membangun, memiliki dan                  finance, construct, own and operate a mini hydro
        mengoperasikan fasilitas pembangkit listrik tenaga             power generating facility (the “infrastructure”) and
        mini hidro (“infrastruktur”) dan menjual kepada PLN            sell to PLN the power generated therefrom on
        energi yang dihasilkan darinya dengan syarat dan               terms and conditions as agreed in the PPA.
        kondisi sebagaimana disepakati dalam PPA.                      The infrastructure is used for its entire useful life
        Infrastruktur digunakan untuk seluruh masa                     for the purpose of the service concession
        manfaatnya untuk tujuan pengaturan layanan                     arrangement.
        konsesi.

        Dalam ISAK 16 mengatur prinsip umum dalam                      Under ISAK 16 determines the general principles
        pengakuan hak dan kewajiban terkait dengan                     in the recognition and measurement of liabilities
        konsesi jasa, WSE tidak mengakui infrastruktur                 and rights related to service concession, WSE
        sebagai aset tetap namun mengakui sebagai aset                 does not recognize the infrastructure as property
        keuangan, karena WSE memiliki hak tanpa syarat                 and equipment but recognizes it as a financial
        untuk menerima kas dari PLN melalui pembayaran                 asset, as WSE has an unconditional right to
        kapasitas berdasarkan PPA. Aset keuangan dicatat               receive cash from PLN through the capacity
        sebagai “pinjaman yang diberikan dan piutang”                  payments under the PPA. The financial asset
        sesuai dengan PSAK 71, “Instrumen Keuangan”.                   is accounted as a “loans and receivables” in
                                                                       accordance to PSAK 71, “Financial Instruments”.

        ISAK 22 memberikan panduan spesifik mengenai                   ISAK 22 provides specific guidance for
        pengungkapan yang diperlukan atas perjanjian                   the required disclosures regarding the service
        konsesi jasa.                                                  concession agreement.



                                                          54
Page 58
                                                                  The original consolidated financial statements included herein are in
                                                                                                             the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                             PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                       AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                         NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                   FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                          AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                 MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                     (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)         (Expressed in full Rupiah amount, unless otherwise stated)

        WSE menghitung pendapatan yang terkait dengan                  WSE accounts for revenue relating to operation
        jasa operasi sesuai dengan PSAK 72, “Pendapatan                services in accordance with PSAK 72, “Revenue
        dari Kontrak dengan Pelanggan”. WSE mencatat                   from Contracts with Customer”. WSE accounts for
        kewajiban kontraktual untuk memelihara atau                    the contractual obligations to maintain or restore
        mengembalikan infrastruktur di lokasi operasi                  the infrastructure in the plant operations in
        sesuai dengan PSAK 57, Provisi, Kewajiban                      accordance to PSAK 57, Provisions, Contingent
        Kontinjensi dan Aktiva Kontinjensi.                            Liabilities and Contingent Assets.

   t.   Utang Bruto kepada Subkontraktor                          t.   Gross Amount Due to Subcontractors

        Utang bruto kepada subkontraktor diakui atas dasar             Gross      amount    due     to   subcontractors
        akrual yang merupakan utang prestasi kerja                     is recognized on accrual basis which represents
        subkontraktor yang belum diberitaacarakan, baik                the uncertified subcontractor’s working progress,
        dari subkontraktor atau material yang diakui sebagai           either from subcontractor or materials which
        prestasi karena belum           memenuhi syarat                are recognized as progress as it has not fulfilled
        pembayaran sesuai kontrak. Utang bruto kepada                  the certain payment condition as stated in
        subkontraktor disajikan sebesar selisih antara biaya           the contract. Gross amount due to subcontractor
        yang terjadi ditambah laba atau dikurangi kerugian             is presented as the differences between costs
        yang diakui.                                                   occurred added by income or deducted by
                                                                       realized loss.

   u.   Pengakuan Pendapatan dan Beban                            u.   Revenue and Expense Recognition

        PSAK 72 menentukan pengakuan pendapatan,                       PSAK 72 determines that the revenue
        yaitu terjadi ketika pengendalian atas barang telah            is recognized when control of goods has been
        dialihkan atau pada saat (atau selama) jasa                    transferred or when (or during) the rendering of
        diberikan (kewajiban pelaksanaan telah dipenuhi).              services (performance obligation is satisfied).
        Pendapatan usaha konstruksi yang telah diterbitkan             Revenues from the construction business for
        Berita Acara Prestasi Proyek dan fakturnya diakui              which the Minutes of Project Achievement have
        sebagai piutang usaha, sedangkan yang belum                    been issued and invoices are recognized as trade
        diterbitkan fakturnya diakui sebagai tagihan bruto             receivables, while those whose invoices have not
        pemberi kerja. Pendapatan usaha yang belum                     been issued are recognized as employer gross
        diterbitkan faktur nya dan belum ada Berita Acara              invoices. Business income for which invoices
        Prestasi Proyek diakui sebagai pekerjaan dalam                 have not been issued and there is no Minutes of
        proses Penerapan standar ini mempengaruhi                      Project Achievement are recognized as work in
        pengakuan pendapatan pada bisnis properti pada                 progress.The implementation of this standard
        WKR (Entitas Anak), yaitu pendapatan diakui ketika             affects the recognition of revenue in the WKR’s
        unit properti diserahkan kepada pelanggan, dimana              (Subsidiary) property business, by which
        sebelumnya telah diakui sesuai dengan metode                   the revenue is recognized when the property unit
        persentase penyelesaian.                                       is handed-over to the customer, that previously
                                                                       recognized based on the percentage of
                                                                       completion method.

        Dalam menentukan pengakuan pendapatan, Grup                    In determining revenue recognition, the Group
        melakukan analisa transaksi melalui pendekatan                 performs       analysis     transaction through
        lima langkah berikut:                                          the following five steps of assessment:

        1. Mengidentifikasi kontrak dengan pelanggan,                  1. Identify contracts with customers with certain
           dengan kriteria sebagai berikut:                               criteria as follows:
            − Kontrak telah disetujui oleh pihak-pihak                     − The contract has been agreed by
               terkait dalam kontrak                                             the parties involved in the contract
            − Grup bisa mengidentifikasi hak dari pihak-                   − The Group can identify the rights of
               pihak      terkait  dan      jangka   waktu                       relevant parties and the term of payment
               pembayaran dari barang atau jasa yang                             for the goods or services to be
               akan dialihkan                                                    transferred
            − Kontrak memiliki substansi komersial                         − The contract has commercial substance
            − Besar        kemungkinan       entitas  akan                 − It is probable that the Group will receive
               menerima imbalan atas barang atau jasa                            benefits for the goods or services
               yang dialihkan                                                    transferred.



                                                          55
Page 59
                                                                  The original consolidated financial statements included herein are in
                                                                                                             the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                             PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                       AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                         NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                   FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                          AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                 MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                     (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)         (Expressed in full Rupiah amount, unless otherwise stated)

        2. Mengidentifikasi kewajiban pelaksanaan dalam                2. Identify the performance obligations in
           kontrak, untuk menyerahkan barang atau jasa                    the contract, to transfer distinctive goods or
           yang memiliki karakteristik yang berbeda ke                    services to the customer.
           pelanggan.
        3. Menentukan harga transaksi, setelah dikurangi               3. Determine the transaction price, net of sales
           potongan penjualan dan pajak pertambahan                       discounts and value added tax, which an
           nilai, yang berhak diperoleh suatu entitas                     entity expects to be entitled in exchange for
           sebagai kompensasi atas diserahkannya                          transferring promised goods or services to
           barang atau jasa yang dijanjikan ke pelanggan.                 customer.
        4. Mengalokasikan harga transaksi kepada setiap                4. Allocate the transaction price to each
           kewajiban pelaksanaan dengan menggunakan                       performance obligation on the basis of
           dasar harga jual dari setiap barang atau jasa                  the selling prices of each goods or services
           yang dijanjikan di kontrak.                                    promised in the contract.
        5. Mengakui pendapatan ketika kewajiban                        5. Recognize revenue when performance
           pelaksanaan telah dipenuhi yaitu dengan                        obligations is satisfied non distinct method or
           metode sepanjang waktu atau dengan metode                      distinct method.
           pada suatu waktu tertentu.

        Pembayaran harga transaksi berbeda untuk setiap                Payment of the transaction price differs for each
        kontrak. Aset kontrak diakui apabila kewajiban                 contracts. Contract asset is recognises when
        pelaksanaan yang telah dipenuhi melebihi                       performance obligation satisfied is more than
        pembayaran yang dilakukan oleh pelanggan.                      the payments by customer. Contract liability is
        Liabilitas kontrak diakui ketika pembayaran yang               recognized when the payments by customer is
        dilakukan oleh pelanggan melebihi kewajiban                    more than the performance obligation satisfied.
        pelaksanaan yang telah dipenuhi. Aset kontrak                  Contract assets are presented under gross
        disajikan dalam tagihan bruto kepada pengguna                  amounts due from customers, and contract
        jasa, dan liabilitas kontrak disajikan dalam utang             liabilities are presented under gross amount due
        bruto kepada subkontraktor.                                    to subcontractors.
        Kriteria tertentu juga harus terpenuhi untuk setiap            The specific criteria also must be met for each of
        aktivitas Grup seperti dijelaskan di bawah:                    the Group’s activities as described below:

        −   Pendapatan dari jasa konstruksi diakui dengan              −    Revenue from construction services are
            metode persentase penyelesaian berdasarkan                      recognized based on the percentage of
            kemajuan fisik proyek pada tanggal pelaporan.                   completion method, determined using
                                                                            physical progress of the projects at
                                                                            the reporting date.
        −   Pendapatan jasa operasi dan pemeliharaan                   −    Revenue       relating   to   operation    and
            atas perjanjian konsesi jasa diakui pada saat                   maintenance        service   under      service
            pelanggan menerima dan mengonsumsi                              concession arrangements is recognized when
            manfaat dari jasa tersebut.                                     the customer has received and consumed
                                                                            the benefit from the services.
        −   Pendapatan dari penjualan real estat diakui                −    Revenue from the sale of real estate
            pada saat pengendalian atas real estat telah                    is recognized when the control of real estate
            dialihkan kepada pelanggan.                                     have been transferred to customers.
        −   Pendapatan dari penjualan beton pracetak,                  −    Revenue from the sale of precast, readymix
            readymix dan baja diakui pada saat                              and steel is recognized when the control of
            pengendalian atas barang telah berpindah                        goods has been transferred to the customer.
            kepada pelanggan.

        Beban diakui pada saat          terjadinya,   dengan           Expenses are recognized as incurred on an
        menggunakan dasar akrual.                                      accruals basis.

   v.   Sewa                                                      v.   Leases

        Grup sebagai pihak penyewa mengakui aset hak-                   Group as lessee recognized right-of-use assets
        guna dan liabilitas sewa terkait dengan sewa,                   and leases liabilities related to leases, except for
        kecuali atas sewa jangka pendek atau sewa dengan                short-term leases or leases with low value assets.
        aset yang bernilai rendah. Liabilitas sewa diukur               These lease liabilities were measured at
        pada nilai kini dari sisa pembayaran sewa, yang                 the present value of the remaining lease
        didiskontokan dengan menggunakan suku bunga                     payments, discounted using the incremental

                                                          56
Page 60
                                                                  The original consolidated financial statements included herein are in
                                                                                                             the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                             PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                       AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                         NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                   FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                          AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                 MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                     (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)         (Expressed in full Rupiah amount, unless otherwise stated)

        pinjaman inkremental. Dalam menentukan suku                     borrowing rate. In determining incremental
        bunga      pinjaman      inkremental,   Grup                    borrowing rate, the Group considers the following
        mempertimbangkan faktor-faktor utama berikut:                   main factors; the Goup’s corporate credit risk,
        risiko kredit korporat Grup, jangka waktu                       the lease term, the lease payment term,
        sewa, jangka waktu pembayaran sewa, waktu                       the time at which the lease is entered into, and
        dimana sewa dimasukkan, dan mata uang dimana                    the currency in which the lease payments
        pembayaran sewa ditentukan.                                     are denominated.

        Grup mencatat sewa yang diklasifikasikan menjadi               The Company accounts for leases classified
        sebagai berikut:                                               became as follow:

        a. Mencatat aset hak guna dan liabilitas sewa                   a. Recognises right-of-use assets and lease
           dalam laporan posisi keuangan, yang diukur                      liabilities in the statement of financial position,
           pada nilai kini dari pembayaran sewa masa                       initially measured at the present value of
           depan;                                                          the future lease payments;
        b. Mencatat penyusutan aset hak guna dan bunga                  b. Recognises depreciation of right-of-use
           atas liabilitas sewa dalam laporan laba rugi;                   assets and interest on lease liabilities in profit
                                                                           or loss;
        c. Memisahkan jumlah total pembayaran sewa ke                   c. Separates the total amount of cash paid into a
           bagian pokok dan bunga pada laporan arus kas                    principal portion (presented within financing
           yang disajikan dalam aktivitas pendanaan.                       activities) and interest (presented within
                                                                           financing activities) in the consolidated
                                                                           statement of cash flows.

   w. Biaya Pinjaman                                              w. Borrowing Costs

        Biaya pinjaman yang dapat diatribusikan langsung               Borrowing costs that are directly attributable to
        dengan perolehan, pembangunan atau pembuatan                   the acquisition, construction or production of a
        aset kualifikasian, dikapitalisasi sebagai bagian              qualifying asset, are capitalized as part of
        biaya perolehan aset tersebut. Biaya pinjaman                  the cost of asset. Other borrowing costs
        lainnya diakui sebagai beban pada saat terjadi.                are recognized as an expense when incurred.
        Biaya pinjaman dapat mencakup beban bunga,                     Borrowing costs may include interest expense,
        beban keuangan dalam sewa pembiayaan atau                      finance charges in respect of finance leases, or
        selisih kurs yang berasal dari pinjaman dalam mata             exchange differences arising from foreign
        uang asing sepanjang selisih kurs tersebut                     currency borrowings to the extent that they
        diperlakukan sebagai penyesuaian atas biaya                    are regarded as an adjustment to interest costs.
        bunga.

        Kapitalisasi biaya pinjaman dimulai pada saat Grup             Capitalization of borrowing costs commences
        telah melakukan aktivitas yang diperlukan untuk                when the Group undertakes activities necessary
        mempersiapkan aset agar dapat digunakan atau                   to prepare the asset for its intended use or sale
        dijual sesuai dengan intensinya serta pengeluaran              and expenditures for the asset and its borrowing
        untuk aset dan biaya pinjamannya telah terjadi.                costs has been incurred. Capitalization of
        Kapitalisasi biaya pinjaman dihentikan ketika secara           borrowing costs ceases when substantially all
        substansial seluruh aktivitas yang diperlukan untuk            the activities necessary to prepare the qualifying
        mempersiapkan aset kualifikasian agar dapat                    assets for its intended use or sale are complete.
        digunakan atau dijual sesuai dengan intensinya
        telah selesai.

        Konstruksi yang termasuk dalam perolehan aset                  Construction included in acquisition of certain
        tertentu adalah proyek-proyek pre-financing yang               assets is the pre-financing projects whose
        pembangunannya membutuhkan waktu lebih dari                    constructions time is required more than one year.
        satu tahun.

   x.   Kombinasi Bisnis                                          x.   Business Combinations

        Kombinasi bisnis adalah suatu transaksi atau                   Business combination is a transaction or other
        peristiwa lain dimana pihak pengakuisisi                       events in which an acquirer obtains control of one
        memperoleh pengendalian atas satu atau lebih                   or more businesses. Business combination is
        bisnis.  Kombinasi   bisnis  dicatat dengan                    accounted for by applying the acquisition method.
        menggunakan metode akuisisi. Imbalan yang                      The consideration transferred in a business

                                                          57
Page 61
                                                                    The original consolidated financial statements included herein are in
                                                                                                               the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                               PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                         AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                           NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                     FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                            AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                   MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                       (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)           (Expressed in full Rupiah amount, unless otherwise stated)

        dialihkan dalam suatu kombinasi bisnis diukur pada               combination is measured at fair value, which is
        nilai wajar, yang dihitung sebagai hasil penjumlahan             computed as the sum of the fair value of
        dari nilai wajar seluruh aset yang dialihkan oleh                the assets transferred by the Group at acquisition
        Grup pada tanggal akuisisi, liabilitas yang diakui               date, liabilities recognized by the Group to former
        oleh Grup kepada pemilik sebelumnya dari pihak                   owners of the acquiree, and the equity interests
        yang diakuisisi, dan kepentingan ekuitas yang                    issued by the Group in exchange for control of the
        diterbitkan     oleh    Grup    dalam      pertukaran            acquiree.       Acquisition-related   costs     are
        pengendalian dari pihak yang diakuisisi. Biaya-                  recognized as expenses in the period in which
        biaya terkait akuisisi diakui sebagai beban pada                 the costs are incurred and the services are
        periode saat biaya tersebut terjadi dan jasa diterima.           rendered.

        Pada tanggal akuisisi, aset teridentifikasi yang                 At the acquisition date, the identifiable assets
        diperoleh dan liabilitas yang diambil alih diakui pada           acquired and the liabilities assumed are
        nilai wajar kecuali untuk aset dan liabilitas tertentu           recognized at the fair value except for certain
        yang diukur sesuai dengan SAK yang relevan.                      assets and liabilities that are measured in
                                                                         accordance with the relevant SAK.

        Komponen kepentingan non-pengendali pada pihak                   Components of non-controlling interests of
        yang diakuisisi diukur baik pada nilai wajar ataupun             the acquiree are measured either at fair value or
        pada bagian proporsional instrumen kepemilikan                   according to proportional share of the equity
        yang ada dalam jumlah yang diakui atas aset neto                 instruments in the recognized amounts of
        teridentifikasi dari pihak diakuisisi.                           the acquiree’s identifiable net assets.

        Bila suatu kombinasi bisnis dilakukan secara                     When a business combination is achieved in
        bertahap, kepemilikan terdahulu Grup atas pihak                  stages, the Group’s previously held equity interest
        terakuisisi diukur kembali ke nilai wajar pada                   in the acquiree is remeasured at its fair value at
        tanggal akuisisi dan keuntungan atau kerugiannya,                the acquisition date and the resulting gain or loss,
        jika ada, diakui dalam laba rugi. Apabila dalam                  if there is any, is recognized in profit or loss. If in
        periode sebelumnya, perubahan nilai wajar yang                   prior periods, changes in fair value of its equity
        berasal dari kepentingan ekuitasnya sebelum                      interest in the acquiree prior to the acquisition
        tanggal akuisisi telah diakui dalam penghasilan                  date      had     been    recognized      in    other
        komprehensif lain, jumlah tersebut diakui dengan                 comprehensive income, that amount shall be
        dasar yang sama sebagaimana dipersyaratkan jika                  recognized with the same basis as would be
        Grup telah melepas secara langsung kepentingan                   required had the Group disposed of the previously
        ekuitas yang dimiliki sebelumnya.                                held equity interest directly.

        Jika akuntansi awal untuk kombinasi bisnis belum                 If the initial accounting for a business combination
        selesai pada akhir periode pelaporan saat                        is incomplete by the end of the reporting period in
        kombinasi terjadi, Grup melaporkan jumlah                        which the combination occurs, the Group reports
        sementara        untuk    pos-pos    yang   proses               provisional amounts for the items for which
        akuntansinya belum selesai dalam laporan                         the      accounting      is    incomplete.    During
        keuangannya. Selama periode pengukuran, Grup                     the measurement period, the Group shall
        menyesuaikan         secara    retrospektif jumlah               retrospectively adjust those provisional amounts
        sementara tersebut, dan mengakui tambahan aset                   and recognize additional assets or liabilities, to
        atau liabilitas, untuk mencerminkan informasi baru               reflect new information obtained about facts and
        yang diperoleh tentang fakta dan keadaan yang ada                circumstances that existed as of the acquisition
        pada tanggal akuisisi, yang jika diketahui, akan                 date that, if known, would have resulted in
        menyebabkan pengakuan aset dan liabilitas yang                   the recognition of those assets and liabilities as of
        dimaksud pada tanggal tersebut.                                  that date.

        Pada tanggal akuisisi, Grup mengakui goodwill yang               At acquisition date, the Group recognizes
        diukur sebagai selisih lebih antara (a) nilai                    goodwill which is measured as the excess of (a)
        gabungan dari imbalan yang dialihkan, jumlah                     the aggregate of the consideration transferred,
        setiap kepentingan non-pengendali, dan jika                      the amount of any non-controlling interest, and in
        kombinasi bisnis dilakukan secara bertahap, nilai                a business combination achieved in stages,
        wajar pada tanggal akuisisi kepentingan ekuitas                  the acquisition-date fair value of the Group’s
        yang sebelumnya dimiliki Grup atas pihak yang                    previously held equity interest in the acquiree; and
        diakuisisi; dan (b) selisih jumlah dari aset                     (b) the net of the acquisition-date amounts of
        teridentifikasi yang diperoleh dan liabilitas yang               the identifiable assets acquired and liabilities
        diambil alih pada tanggal akuisisi. Jika imbalan                 assumed. If this consideration is lower than
        tersebut kurang dari nilai wajar aset neto pihak yang            the fair value of the net assets of the acquiree,

                                                           58
Page 62
                                                                      The original consolidated financial statements included herein are in
                                                                                                                 the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                 PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                           AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                       FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                              AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                     MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                         (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)             (Expressed in full Rupiah amount, unless otherwise stated)

        diakuisisi, selisih tersebut diakui dalam laporan laba             the difference is recognized in profit or loss as
        rugi sebagai keuntungan dari akuisisi setelah                      gain on bargain purchase after previously the
        sebelumnya manajemen menilai kembali apakah                        management reassesses whether it has correctly
        telah mengidentifikasi dengan tepat seluruh aset                   identified all the assets acquired and all
        yang diperoleh dan liabilitas yang diambil alih serta              the liabilities assumed and recognize any
        mengakui setiap aset atau liabilitas tambahan yang                 additional assets or liabilities that are identified in
        dapat diidentifikasi dalam penelaahan tersebut.                    that review.

        Setelah pengakuan awal, goodwill diukur pada                       Subsequent             to     initial     recognition,
        jumlah tercatat dikurangi akumulasi kerugian                       goodwill is measured at cost less any
        penurunan nilai. Untuk tujuan pengujian penurunan                  accumulated           impairment      losses.      For
        nilai, goodwill yang diperoleh dari suatu kombinasi                the      purposes         of   impairment     testing,
        bisnis, sejak tanggal akuisisi, dialokasikan kepada                goodwill acquired in a business combination,
        setiap Unit Penghasil Kas dari Grup yang                           from the acquisition date, is allocated to each of
        diperkirakan akan memberikan manfaat dari sinergi                  the      Group’s        Cash     Generating     Units
        kombinasi bisnis tersebut, terlepas dari apakah aset               that       is    expected       to    benefit    from
        atau liabilitas lain dari pihak yang diakuisisi                    the synergies of business combinations,
        ditempatkan dalam Unit Penghasil Kas tersebut.                     regardless         of     whether     other    assets
                                                                           or liabilities of the acquiree are assigned to those
                                                                           Cash Generating Units.

        Jika goodwill telah dialokasikan pada suatu Unit                   If goodwill was allocated to a Cash Generating
        Penghasil Kas dan operasi tertentu atas Unit                       Unit and certain operations on the Cash
        Penghasil Kas tersebut dilepaskan, maka goodwill                   Generating Unit are disposed, the goodwill
        yang terkait dengan operasi yang dilepaskan                        associated with the disposed operation
        tersebut termasuk dalam jumlah tercatat operasi                    is included in the carrying amount of the operation
        tersebut ketika menentukan keuntungan atau                         when determining the gain or losses on disposal.
        kerugian dari pelepasan. Goodwill yang dilepaskan                  The disposed goodwill is measured on the basis
        tersebut diukur berdasarkan nilai relatif operasi                  of relative values of the disposed operation and
        yang dihentikan dan porsi Unit Penghasil Kas yang                  the portion of the Cash Generating Units retained.
        ditahan.

        Goodwill awalnya diukur pada harga perolehan,                      Goodwill is initially measured at historical cost,
        yang merupakan selisih lebih dari nilai agregat                    the excess of the aggregate of the consideration
        imbalan yang dialihkan dan nilai yang diakui oleh                  transferred and the amount recognized for non-
        kepentingan non-pengendali dan nilai kepentingan                   controlling interests, and any previous interest
        ekuitas yang dimiliki sebelumnya, atas jumlah neto                 held, over the net identifiable assets acquired and
        dari aset teridentifikasi yang diperoleh dan liabilitas            liabilities assumed. If the fair value of net assets
        yang diambil alih. Jika nilai wajar dari jumlah neto               acquired is in excess of the aggregate
        aset yang diakuisisi melebihi nilai agregat imbalan                consideration transferred, the Group reassesses
        yang dialihkan, Grup menilai kembali apakah semua                  whether it has correctly identified all of the assets
        aset yang diakuisisi dan liabilitas yang diambil alih              acquired and all of the liabilities assumed and
        sudah diidentifikasi dengan benar dan memeriksa                    reviews the procedures used to measure
        prosedur yang digunakan untuk mengukur nilai                       the amounts to be recognized at the acquisition
        yang harus diakui pada tanggal akuisisi. Jika hasil                date. If the reassessment still results in an excess
        penilaian kembali tersebut masih menghasilkan                      of the fair value of net assets acquired over
        selisih lebih atas nilai wajar dari aset neto diakuisisi           the aggregate consideration transferred, then
        atas nilai agregat imbalan yang dialihkan, maka                    the gain is recognized in profit or loss.
        keuntungan diakui pada laba rugi.

        Saat penentuan imbalan dari kombinasi bisnis                       When the determination of consideration from
        termasuk imbalan kontinjensi, imbalan kontinjensi                  a business combination includes contingent
        ini diukur pada nilai wajar saat tanggal akuisisi.                 consideration, it is measured at its fair value on
        Imbalan kontinjensi diklasifikasikan sebagai ekuitas               acquisition date. Contingent consideration is
        atau      liabilitas   keuangan.      Jumlah   yang                classified either as equity or a financial liability.
        diklasifikasikan     sebagai   liabilitas  keuangan                Amounts classified as a financial liability are
        selanjutnya diukur kembali pada nilai wajar dimana                 subsequently remeasured to fair value with
        perubahan pada nilai wajar tersebut diakui dalam                   changes in fair value recognized in profit or loss
        laba rugi atau ketika penyesuaian dicatat diluar                   when adjustments are recorded outside
        periode pengukuran. Perubahan pada nilai wajar                     the measurement period. Changes in the fair
        imbalan kontinjensi yang memenuhi persyaratan                      value of the contingent consideration that qualify

                                                             59
Page 63
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

        sebagai     penyesuaian     periode     pengukuran,             as measurement period adjustments are adjusted
        disesuaikan       secara    retrospektif,    dengan             retrospectively, with corresponding adjustments
        penyesuaian        terkait   terhadap      goodwill.            made against goodwill. Measurement period
        Penyesuaian        periode   pengukuran       adalah            adjustments are adjustments that arise from
        penyesuaian yang timbul dari informasi tambahan                 additional     information    obtained    during
        yang didapat selama periode pengukuran, yang                    the measurement period, which cannot exceed
        tidak boleh melebihi satu tahun dari tanggal akusisi,           one year from the acquisition date, about facts
        tentang fakta dan kondisi yang ada pada saat                    and circumstances that existed at the acquisition
        tanggal akuisisi.                                               date.

        Dalam suatu kombinasi bisnis yang dilakukan                     In a business combination that is achieved in
        secara bertahap, pihak pengakuisisi mengukur                    stages, the acquirer remeasures its previously
        kembali kepentingan ekuitas yang dimiliki                       held equity interest in the acquiree at
        sebelumnya pada pihak diakuisisi pada nilai wajar               its acquisition-date fair value and recognizes gain
        tanggal akuisisi dan mengakui keuntungan atau                   or loss resulting, if there is any, in profit or loss.
        kerugian yang dihasilkan, jika ada, dalam laba rugi.

   y.   Pajak Penghasilan                                          y.   Income Taxes

        Beban pajak adalah jumlah gabungan pajak kini dan               Tax expense is the aggregate amount included in
        pajak tangguhan yang diperhitungkan dalam                       the determination of profit or loss for
        menentukan laba rugi pada suatu periode. Pajak                  the period in respect of the current tax and
        kini dan pajak tangguhan diakui dalam laba rugi,                deferred tax. Current tax and deferred tax
        kecuali pajak penghasilan yang timbul dari transaksi            is recognized in profit or loss, except for income
        atau peristiwa yang diakui dalam penghasilan                    tax arising from transactions or events that are
        komprehensif lain atau secara langsung di ekuitas.              recognized in other comprehensive income or
        Dalam hal ini, pajak tersebut masing-masing diakui              directly in equity. In this case, the tax is recognized
        dalam penghasilan komprehensif lain atau ekuitas.               in other comprehensive income or equity,
                                                                        respectively.

        Beban pajak kini ditentukan berdasarkan laba kena               Current tax expense is determined based on
        pajak dalam periode yang bersangkutan yang                      the taxable income for the year computed using
        dihitung berdasarkan tarif pajak yang berlaku.                  prevailing tax rates.

        Jumlah pajak kini untuk periode berjalan dan                    The amount of unpaid current tax for current and
        periode sebelumnya yang belum dibayar diakui                    prior periods is recognized as a liability.
        sebagai liabilitas. Jika jumlah pajak yang telah                If the amount already paid in respect of current
        dibayar untuk periode berjalan dan periode-periode              and prior periods exceeds the amount due for
        sebelumnya melebihi jumlah pajak yang terutang                  those periods, the excess shall be recognized as
        untuk periode tersebut, maka kelebihannya diakui                an asset. Current tax liabilities (assets) for
        sebagai aset. Liabilitas (aset) pajak kini untuk                the current and prior periods shall be measured at
        periode berjalan dan periode sebelumnya diukur                  the amount expected to be paid to (recovered
        sebesar jumlah yang diperkirakan akan dibayar                   from) the taxation authorities, using the tax rates
        kepada (direstitusi dari) otoritas perpajakan, yang             (and tax laws) that have been enacted or
        dihitung menggunakan tarif pajak (dan undang-                   substantively enacted by the end of the reporting
        undang pajak) yang telah berlaku atau secara                    period.
        substantif telah berlaku pada akhir periode
        pelaporan.

        Manfaat terkait dengan rugi pajak yang dapat ditarik            Tax benefits relating to tax loss that can be carried
        untuk memulihkan pajak kini dari periode                        forward to recover the current tax of previous
        sebelumnya diakui sebagai aset. Aset pajak                      periods is recognized as an asset. Deferred tax
        tangguhan diakui untuk akumulasi rugi pajak belum               asset is recognized for the carry forward of unused
        dikompensasi dan kredit pajak belum dimanfaatkan                tax losses and unused tax credit to the extent that
        sepanjang kemungkinan besar laba kena pajak                     it is probable that future taxable profit will be
        masa depan akan tersedia untuk dimanfaatkan                     available against which the unused tax losses and
        dengan rugi pajak belum dikompensasi dan kredit                 unused tax credits can be utilized.
        pajak belum dimanfaatkan.




                                                          60
Page 64
                                                                  The original consolidated financial statements included herein are in
                                                                                                             the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                             PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                       AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                         NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                   FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                          AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                 MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                     (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)         (Expressed in full Rupiah amount, unless otherwise stated)

        Seluruh perbedaan temporer kena pajak diakui                   A deferred tax liability shall be recognized for all
        sebagai liabilitas pajak tangguhan, kecuali                    taxable temporary differences, except to all
        perbedaan temporer kena pajak yang berasal dari:               taxable temporary differences arising from:

        a)    Pengakuan awal goodwill; atau                             a)    The initial recognition of goodwill; or
        b)    Pengakuan awal aset atau liabilitas dari                  b)    The initial recognition of an asset or liability
              transaksi yang bukan kombinasi bisnis dan                       in a transaction which is not a business
              pada saat transaksi tidak mempengaruhi laba                     combination and at the time of
              akuntansi atau laba kena pajak (rugi pajak).                    the transaction, does not affect neither
                                                                              accounting profit nor taxable profit (tax loss).

       Aset pajak tangguhan diakui untuk seluruh perbedaan               A deferred tax asset shall be recognized for all
       temporer dapat dikurangkan sepanjang kemungkinan                  deductible temporary differences to the extent
       besar laba kena pajak akan tersedia sehingga                      that it is probable that taxable profit will be
       perbedaan temporer dapat dimanfaatkan untuk                       available against which the deductible
       mengurangi laba dimaksud, kecuali jika aset pajak                 temporary difference can be utilized, unless
       tangguhan timbul dari pengakuan awal aset atau                    the deferred tax asset arises from the initial
       pengakuan awal liabilitas dalam transaksi yang bukan              recognition of an asset or liability in
       kombinasi bisnis dan pada saat transaksi tidak                    a transaction that is not a business combination
       mempengaruhi laba akuntansi atau laba kena pajak                  and at the time of the transaction does not affect
       (rugi pajak).                                                     neither the accounting profit nor taxable profit
                                                                         (tax loss).

       Aset dan liabilitas pajak tangguhan diukur dengan                 Deferred tax assets and liabilities are measured
       menggunakan tarif pajak yang diharapkan berlaku                   at the tax rates that are expected to apply when
       ketika aset dipulihkan atau liabilitas diselesaikan,              the asset is realized or the liability is settled,
       berdasarkan tarif pajak (dan peraturan pajak) yang                based on tax rates (and tax laws) that have been
       telah berlaku atau secara substantif telah berlaku                enacted or substantively enacted by the end of
       pada akhir periode pelaporan. Pengukuran aset dan                 the reporting period. The measurement of
       liabilitas    pajak    tangguhan      mencerminkan                deferred tax assets and liabilities shall reflect
       konsekuensi pajak yang sesuai dengan cara Grup                    the tax consequences that would follow from
       memperkirakan, pada akhir periode pelaporan, untuk                the manner in which the Group expects,
       memulihkan atau menyelesaikan jumlah tercatat aset                at the end of the reporting period, to recover or
       dan liabilitasnya.                                                settle the carrying amount of its assets and
                                                                         liabilities.

       Jumlah tercatat aset pajak tangguhan ditelaah ulang               The carrying amount of a deferred tax asset is
       pada akhir periode pelaporan. Grup mengurangi                     reviewed at the end of each reporting period.
       jumlah tercatat aset pajak tangguhan jika                         The Group shall reduce the carrying amount of
       kemungkinan besar laba kena pajak tidak lagi                      a deferred tax asset if there is a high probability
       tersedia dalam jumlah yang memadai untuk                          that sufficient taxable profit will no longer be
       mengkompensasikan sebagian atau seluruh aset                      available to allow the benefit of part or all of that
       pajak tangguhan tersebut. Setiap pengurangan                      deferred tax asset to be utilised. Any such
       tersebut dilakukan pembalikan atas aset pajak                     reduction shall be reversed to the extent that
       tangguhan hingga kemungkinan besar laba kena                      it becomes probable that sufficient taxable profit
       pajak yang tersedia jumlahnya memadai.                            will be available.

       Grup melakukan saling hapus aset pajak tangguhan                  The Group offsets deferred tax assets and
       dan liabilitas pajak tangguhan jika dan hanya jika:               deferred tax liabilities if, and only if:

       a)    Grup memiliki hak yang dapat dipaksakan secara              a)    The Group has a legally enforceable right
             hukum untuk melakukan saling hapus aset pajak                     to offset deferred tax assets against
             tangguhan terhadap liabilitas pajak tangguhan;                    deferred tax liabilities; and
             dan
       b)    Aset pajak tangguhan dan liabilitas pajak                   b)    The deferred tax assets and liabilities are
             tangguhan terkait dengan pajak penghasilan                        related to the income taxes levied by
             yang dikenakan oleh otoritas perpajakan yang                      the same taxation authority on either:
             sama atas:




                                                          61
Page 65
                                                                    The original consolidated financial statements included herein are in
                                                                                                               the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                               PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                         AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                           NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                     FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                            AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                   MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                       (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)           (Expressed in full Rupiah amount, unless otherwise stated)

            i. entitas kena pajak yang sama; atau                                i. the same taxable entities; or
            ii. entitas kena pajak yang berbeda yang                             ii. different taxable entities that are
                bermaksud untuk memulihkan aset dan                                  intended to recover current tax assets
                liabilitas pajak kini dengan dasar neto, atau                        and liabilities with a net basis, or
                merealisasikan aset dan menyelesaikan                                to realize the assets and settle
                liabilitas secara bersamaan, pada setiap                             the liabilities simultaneously, in each
                periode masa depan dimana jumlah                                     future period in which significant
                signifikan atas aset atau liabilitas pajak                           amounts of deferred tax assets or
                tangguhan diperkirakan untuk diselesaikan                            liabilities are expected to be settled or
                atau dipulihkan.                                                     recovered.

       Grup melakukan saling hapus atas aset pajak kini dan                The Group offsets the current tax assets and
       liabilitas pajak kini jika dan hanya jika:                          current tax liabilities if, and only if:

       a)   Memiliki hak yang dapat dipaksakan secara                      a)    Has legally enforceable rights to offset
            hukum untuk melakukan saling hapus atas                              the recognized amounts; and
            jumlah yang diakui; dan
       b)   Bermaksud untuk menyelesaikan dengan dasar                     b)    Intends either to settle on a net basis, or to
            neto    atau    merealisasikan      aset   dan                       realize the assets and settle liabilities
            menyelesaikan liabilitas secara bersamaan.                           simultaneously.

  z.   Sukuk                                                          z.    Sukuk

       Sukuk adalah efek syariah berupa sertifikat atau                     Sukuk are sharia securities represented by a
       bukti kepemilikan yang bernilai sama dan mewakili                    certificate or evidence of ownership of equal
       bagian yang tidak tertentu (tidak terpisahkan atau                   denomination and representing individual
       tidak terbagi) atas: (a). aset berwujud tertentu; (b).               ownership interest in (not separated or
       manfaat atas aset berwujud tertentu baik yang                        divided): (a). particular intangible assets;
       sudah ada maupun yang akan ada; (c). jasa yang                       (b).existing or future benefits of particular
       sudah ada maupun yang akan ada; (d). aset proyek                     intangible assets; (c).existing or future
       tertentu; atau (e). kegiatan investasi yang telah                    services; (d).particular project assets; or
       ditentukan.                                                          (e).determined investment activity.

       Sukuk   mudharabah   adalah           sukuk        yang               Sukuk mudharabah is                  a    sukuk      using
       menggunakan akad mudharabah.                                          a mudharabah’s contract.

       Sukuk mudharabah diakui saat Perusahaan menjadi                       Sukuk mudharabah is recognized when
       pihak yang terikat dengan ketentuan penerbitan                        the Company becomes a party bound by
       sukuk mudharabah. Sukuk mudharabah diakui                             the provisions of sukuk mudharabah
       sebesar nilai nominal.                                                issuance. Sukuk mudharabah is recognized at
                                                                             its nominal amount.

       Biaya transaksi diakui secara terpisah dari sukuk                     A transaction cost is recognized separately
       mudharabah dan disajikan dalam aset sebagai                           from sukuk mudarabah and is presented in
       beban tangguhan, bukan sebagai pos lawan dari                         assets as deferred expense, rather than a
       sukuk mudharabah. Biaya transaksi diamortisasi                        contra account of sukuk mudarabah.
       secara garis lurus selama jangka waktu sukuk                          Transaction cost is amortized on straight-line
       mudharabah.                                                           basis over the terms of sukuk mudharabah.

  aa. Liabilitas Imbalan Kerja                                        aa. Employee Benefits Liabilities

       Imbalan Kerja Jangka Pendek                                          Short-Term Employee Benefits

       Imbalan kerja jangka pendek diakui ketika pekerja                    Short-term employee benefits are recognized
       telah memberikan jasanya dalam suatu periode                         when     an    employee     has    rendered
       akuntansi, sebesar jumlah tidak terdiskonto dari                     service during accounting period, at
       imbalan kerja jangka pendek yang diharapkan akan                     the undiscounted amount of short-term
       dibayar sebagai imbalan atas jasa tersebut.                          employee benefits expected to be paid in
                                                                            exchange for that service.



                                                            62
Page 66
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

       Imbalan kerja jangka pendek mencakup antara lain                    Short-term employee benefits include such as
       upah, gaji, bonus dan insentif.                                     wages, salaries, bonus and incentive.

       Imbalan Pasca Kerja                                                 Post-Employment Benefits

       Imbalan pasca kerja seperti pensiun, uang pisah dan                 Post-employment benefits such as retirement,
       uang penghargaan masa kerja dihitung berdasarkan                    severance and service payments are
       Undang-Undang       Ketenagakerjaan     No. 13/2003                 calculated    based    on    Labor      Law
       (“UU No. 13/2003”).                                                 No. 13/2003 (“Law No. 13/2003”).

       Grup mengakui jumlah liabilitas imbalan pasti neto                  The Group recognizes the amount of the net
       sebesar nilai kini kewajiban imbalan pasti pada akhir               defined benefit liability at the present value of
       periode pelaporan dikurangi nilai wajar aset program                the defined benefit obligation at the end of
       yang dihitung oleh aktuaris independen dengan                       the reporting period less fair value of plan
       menggunakan metode Projected Unit Credit. Nilai kini                assets which is calculated by independent
       kewajiban imbalan pasti ditentukan dengan                           actuaries using the Projected Unit Credit
       mendiskontokan imbalan tersebut.                                    method. Present value of the benefit obligation
                                                                           determined is by discounting the benefit.

       Grup mencatat tidak hanya kewajiban hukum                           The Group not only records its legal obligation
       berdasarkan persyaratan formal program imbalan                      under the formal terms of a defined benefit
       pasti, tetapi juga kewajiban konstruktif yang timbul                obligation, but also for any constructive
       dari praktik informal entitas.                                      obligation that arises from the entity’s informal
                                                                           practices.

       Biaya jasa kini, biaya jasa lalu dan keuntungan atau                Current service cost, past service cost and
       kerugian atas penyelesaian, serta bunga neto atas                   gain or loss on settlement, and net interets on
       liabilitas (aset) imbalan pasti neto diakui dalam laba              the net defined benefit liability (asset) are
       rugi.                                                               recognized in profit or loss.

       Pengukuran kembali atas liabilitas (aset) imbalan                   The remeasurement of the net defined benefit
       pasti neto yang terdiri dari keuntungan dan kerugian                liabilities (assets) comprises actuarial gains
       aktuarial, imbalan hasil atas aset program dan setiap               and losses, the return on plan assets and any
       perubahan dampak atas aset diakui sebagai                           change in effect of the asset are recognized in
       penghasilan komprehensif lain.                                      other comprehensive income.

       Pesangon                                                            Termination Benefits

       Grup mengakui pesangon sebagai liabilitas dan                       The Group recognizes liability and expense for
       beban pada tanggal yang lebih awal di antara:                       termination benefits at the earlier of
                                                                           the following dates:

       (a)   Ketika Grup tidak dapat lagi menarik tawaran                  (a)    When the Group no longer can withdraw
             atas imbalan tersebut; dan                                           the offer of those benefits; and
       (b)   Ketika     Grup     mengakui     biaya     untuk              (b)    When the Group recognizes costs for a
             restrukturisasi yang berada dalam ruang lingkup                      restructuring within the scope of PSAK
             PSAK No. 57 dan melibatkan pembayaran                                No. 57 and involves payment of
             pesangon.                                                            termination benefits.

       Grup mengukur pesangon pada saat pengakuan                          The Group measures termination benefits on
       awal, dan mengukur dan mengakui perubahan                           initial recognition, and measures and
       selanjutnya, sesuai dengan sifat imbalan kerja.                     recognizes    subsequent     changes,    in
                                                                           accordance with the nature of the employee
                                                                           benefits.

       Grup mengikuti program asuransi pensiun yang                        The Group has a pension insurance program
       diselenggarakan oleh PT Asuransi Jiwasraya                          which is organized by PT Asuransi Jiwasraya
       (Persero). Sesuai dengan UU No. 13/2003, Grup                       (Persero). In accordance with the Law
       berkewajiban menutupi kekurangan pembayaran                         No. 13/2003, the Group is obligated to cover
                                                                           the shortage of pension payments when


                                                          63
Page 67
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

       pensiun bila program yang ada sekarang belum                        the pension plans is currently not sufficient to
       cukup menutupi kewajiban.                                           cover liabilities.

       Imbalan Kerja Jangka Panjang Lainnya                                Other Long-Term Employee Benefits

       Imbalan jangka panjang lain seperti cuti berimbalan                 Other long-term benefits such as long service
       jangka panjang dihitung dengan metode projected                     leave is calculated using the projected unit
       unit credit dan didiskontokan ke nilai kini.                        credit method and discounted to present value.


  bb. Investasi pada Entitas Asosiasi dan Ventura                     bb. Investment           in    Associates         and      Joint
      Bersama                                                             Venture

       Entitas Asosiasi                                                    Associates

       Investasi Grup pada entitas asosiasi diukur dengan                  The Group's investment in associates is
       menggunakan metode ekuitas. Entitas asosiasi                        measured using the equity method. An
       adalah suatu entitas dimana Grup mempunyai                          associate       is    an    entity    in   which
       pengaruh signifikan atau kepemilikan saham lebih                    the Group has significant influence or share
       dari 20% hak suara. Pengakuan awal investasi pada                   ownership of more than 20% of the voting
       entitas asosiasi diakui sebesar biaya perolehan dan                 rights. The initial recognition of investments in
       jumlah tercatat tersebut ditambah atau dikurangkan                  associates is recognized at cost and
       untuk mengakui bagian Perusahaan atas laba rugi                     the carrying amount is increased or decreased
       entitas asosiasi setelah tanggal perolehan. Bagian                  to recognize the Group's share in
       Grup atas laba rugi entitas asosiasi diakui dalam laba              the associates' profit or loss after
       rugi Grup. Penerimaan distribusi dari entitas asosiasi              the acquisition date. The Company's share in
       mengurangi nilai tercatat investasi.                                the profit or loss of associates is recognized in
                                                                           the Group's profit or loss. Receipt of
                                                                           distributions      from   associates     reduces
                                                                           the carrying amount of the investment.

       Laporan laba rugi dan penghasilan komprehensif lain                 The consolidated statements of profit or loss
       konsolidasian mencerminkan bagian atas hasil                        and other comprehensive income reflect
       operasi entitas asosiasi. Bila terdapat perubahan                   the share of the results of operations of
       yang diakui langsung pada ekuitas entitas asosiasi,                 the associates. If there is a change that is
       Grup mengakui bagiannya atas perubahan tersebut                     recognized directly in the equity of
       dan mengungkapkan hal ini, jika sebagai hasil                       the associate, the Group recognizes its share
       transaksi-transaksi antara Grup dan entitas asosiasi                of the change and discloses this, if as a result
       dielimininasi pada jumlah sesuai dengan kepentingan                 of transactions between the Group and
       Grup dalan entitas asosiasi.                                        the associate are eliminated at amount in
                                                                           accordance with the Group's interest in
                                                                           the associate.

       Setelah menerapkan metode ekuitas, Grup                             After    applying     the   equity    method,
       menentukan apakah diperlukan untuk mengakui                         the Group determines whether it is necessary
       tambahan laba rugi penurunan nilai atas investasi                   to recognize additional impairment gain or loss
       Grup dalam entitas asosiasi. Grup menentukan pada                   on the Group's investment in associates.
       setiap tanggal pelaporan apakah terdapat bukti yang                 The Group determines at each reporting date
       objektif yang mengindikasikan bahwa investasi dalam                 whether there is objective evidence that
       entitas asosiasi mengalami penurunan nilai. Dalam                   indicates that the investment in the associate
       hal ini, Perusahaan menghitung jumlah penurunan                     is impaired. If this is the case, the Group
       berdasarkan selisih jumlah terpulihkan atas investasi               calculates the amount of impairment based on
       dalam entitas asosiasi dan nilai tercatatnya dan                    the difference between the recoverable
       mengakuinya dalam laporan laba rugi dan                             amount of the investment in associated
       penghasilan komprehensif lain konsolidasian.                        companies and its carrying value and
                                                                           recognizes the amount in the consolidated
                                                                           statement of profit or loss and other
                                                                           comprehensive income.




                                                          64
Page 68
                                                                     The original consolidated financial statements included herein are in
                                                                                                                the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                          AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                      FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                             AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                    MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                        (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)            (Expressed in full Rupiah amount, unless otherwise stated)

       Grup menghentikan penggunaan metode ekuitas                            The Group discontinues the use of the equity
       sejak tanggal ketika investasinya berhenti menjadi                     method from the date when its investment
       investasi pada entitas asosiasi sebagai berikut:                       ceases to be an associate as follows:

       (a)    Jika investasi menjadi entitas anak, dan                       (a) If the investment becomes a subsidiary,
                                                                                 and
       (b)    Jika sisa kepentingan dalam entitas asosiasi                   (b) If the retained interest in the former
              merupakan aset keuangan, maka Grup                                 associate is a financial asset, the Group
              mengukur sisa kepentingan tersebut pada nilai                      measures the retained interest at fair
              wajar.                                                             value.

       Ketika Grup menghentikan penggunaan metode                            When the Group discontinues the use of
       ekuitas, Grup mencatat seluruh jumlah yang                            the equity method, the Group accounts for all
       sebelumnya telah diakui dalam penghasilan                             amounts previously recognized in other
       komprehensif lain yang terkait dengan investasi                       comprehensive income in relation to that
       tersebut menggunakan dasar perlakuan yang sama                        investment on the same basis as would have
       dengan yang disyaratkan jika investee telah                           been required if the investee had directly
       melepaskan secara langsung aset dan liabilitas                        disposed of the related assets or liabilities.
       terkait.

       Pengaturan Bersama                                                    Joint Arrangement

       Pengaturan bersama adalah pengaturan atas dua                         Joint arrangement is an arrangement is which
       atau lebih pihak yang memiliki pengendalian                           two or more parties have joint control, i.e.
       bersama, yaitu persetujuan kontraktual untuk berbagi                  the contractually agreed sharing of control of
       pengendalian atas suatu pengaturan, yang hanya ada                    an arrangement, which exists only when
       ketika keputusan mengenai aktivitas relevan                           decisions about the relevant activities require
       mensyaratkan persetujuan dengan suara bulat dari                      the unanimous consent of the parties sharing
       seluruh pihak yang berbagi pengendalian.                              control.

       Grup mengklasifikasikan         pengaturan     bersama                The Group classifies joint arrangement as:
       sebagai:

       1) Operasi Bersama                                                    1) Joint Operation

             Merupakan pengaturan bersama yang mengatur                           Represents joint arrangement whereby
             bahwa para pihak yang memiliki pengendalian                          the parties that have joint control of
             bersama atas pengaturan memiliki hak atas aset                       the    arrangement         have     rights  to
             dan kewajiban terhadap liabilitas, terkait dengan                    the     assets,      and     obligations   for
             pengaturan tersebut. Para pihak tersebut disebut                     the liabilities, relating to the arrangement.
             operator bersama.                                                    Those parties are called joint operator.

             Operator bersama mengakui hal berikut terkait                        A joint operator recognizes in relation to its
             dengan kepentingannya dalam operasi bersama:                         interest in a joint operation:

             (a) Aset, mencakup bagiannya atas setiap aset                        (a) Assets, including its share of any
                 yang dimiliki bersama;                                               assets held jointly;
             (b) Liabilitas, mencakup bagiannya atas liabilitas                   (b) Liabilities, including its share of any
                 yang terjadi bersama;                                                liabilities incurred jointly;
             (c) Pendapatan dari penjualan bagiannya atas                         (c) Revenue from the sale of its share of
                 output yang dihasilkan dari operasi bersama;                         the output arising from the joint
                                                                                      operation;
             (d) Bagian atas pendapatan dari penjualan                            (d) Share of the revenue from the sale of
                 output oleh operasi bersama; dan                                     the output by the joint operation; and
             (e) Beban, mencakup bagiannya atas setiap                            (e) Expenses, including its share of any
                 beban yang terjadi secara bersama-sama.                              expenses incurred jointly.

       2) Ventura Bersama                                                    2) Joint Venture

             Grup mengklasifikasikan pengaturan bersama                           The Group classifies joint arrangement as
             sebagai ventura bersama yang mengatur bahwa                          a joint venture whereby the parties that

                                                            65
Page 69
                                                                  The original consolidated financial statements included herein are in
                                                                                                             the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                             PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                       AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                         NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                   FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                          AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                 MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                     (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)         (Expressed in full Rupiah amount, unless otherwise stated)

           para pihak yang memiliki pengendalian bersama                       have joint control of the arrangement
           atas pengaturan memiliki hak atas aset neto                         have rights to the net assets of
           pengaturan tersebut. Para pihak tersebut disebut                    the arrangement. Those parties are called
           sebagai venturer bersama.                                           joint venturers.

           Venturer bersama mengakui kepentingannya                            A joint venturer recognizes its interest in
           dalam ventura bersama sebagai investasi dan                         a joint venture as an investment and
           mencatat     investasi  tersebut    dengan                          account for that investment using
           menggunakan metode ekuitas.                                         the equity method.

           Bagian Grup atas laba atau rugi entitas asosiasi                    The Group’s share of post-acquisition
           pasca akuisisi diakui dalam laporan laba rugi dan                   profits or losses is recognized in the profit
           bagian atas mutasi penghasilan komprehensif                         or loss and its share of post-acquisition
           lain-lain pasca akuisisi diakui di dalam                            movements in other comprehensive
           penghasilan komprehensif lain dan diikuti dengan                    income       is   recognized      in    other
           penyesuaian pada jumlah tercatat investasi.                         comprehensive            income          with
           Dividen yang akan diterima dari entitas asosiasi                    a corresponding adjustment to the carrying
           diakui sebagai pengurang jumlah tercatat                            amount of the investment. Dividends
           investasi. Jika bagian Grup atas kerugian entitas                   receivable      from       joint     ventures
           asosiasi     sama     dengan    atau    melebihi                    are recognized as a reduction in the
           kepentingannya pada entitas asosiasi, termasuk                      carrying amount of the investment. When
           piutang tanpa agunan, Grup menghentikan                             the Group’s share of losses in a joint
           pengakuan bagian kerugiannya, kecuali Grup                          venture equal or exceeds its interest in
           memiliki kewajiban atau melakukan pembayaran                        the associate, including any other
           atas nama entitas asosiasi.                                         unsecured receivables, the Group does not
                                                                               recognize further losses, unless it has
                                                                               incurred legal or constructive obligations or
                                                                               made       payments       on     behalf    of
                                                                               the associates.

           Kerugian yang melebihi nilai tercatat investasi                     Loss exceeding the carrying value of
           tidak diakui, kecuali bila Grup mempunyai                           the investment is not recognized, unless
           komitmen untuk memberikan bantuan keuangan                          the Group has committed to provide
           atau menjamin kewajiban entitas asosiasi.                           financial    support      or  guarantee
                                                                               the associates’ obligation.

           Laba dan rugi yang dihasilkan dari transaksi hulu                   Profits and losses resulting from upstream
           dan hilir antara Grup dengan entitas asosiasi                       and downstream transactions between
           diakui dalam laporan keuangan konsolidasian                         the Group and its joint ventures
           Grup hanya sebesar bagian investor lain dalam                       are recognized in the Group’s consolidated
           entitas asosiasi.                                                   financial statements only to the extent of
                                                                               the unrelated investor’s interests in
                                                                               the joint ventures.

           Dalam akuntansi metode ekuitas, kepentingan                         Under the equity method of accounting,
           dalam ventura bersama diakui pada biaya                             interests in joint ventures are initially
           perolehan dan disesuaikan selanjutnya untuk                         recognized at cost and adjusted thereafter
           mengakui bagian Grup atas laba rugi dan                             to recognize the Group’s share of profits or
           penghasilan komperhensif lain pasca perolehan.                      losses and other comprehensive income
           Ketika bagian grup atas rugi dalam ventura                          post acquisition. When the Group’s share
           bersama     sama    dengan     atau   melebihi                      of losses in a joint venture equals or
           kepentingannya dalam ventura bersama (dimana                        exceeds its interests in the joint ventures
           termasuk kepentingan jangka panjang, dalam                          (which includes any long-term interests
           substansinya membentuk bagian dari investasi                        that, in substance, form part of the Group’s
           bersih Grup dalam ventura bersama), Grup tidak                      net investment in the joint ventures),
           mengakui kerugian selanjutnya, kecuali telah                        the Group does not recognize further
           menjadi kewajiban atau telah melakukan                              losses, unless it has incurred obligations or
           pembayaran atas nama ventura bersama.                               made payments on behalf of the joint
                                                                               ventures.

           Keuntungan yang belum terealisasi atas                              Unrealized gains on transactions between
           transaksi antara Grup dan ventura bersama                           the Group and its joint ventures

                                                          66
Page 70
                                                                  The original consolidated financial statements included herein are in
                                                                                                             the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                             PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                       AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                         NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                   FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                          AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                 MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                     (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)         (Expressed in full Rupiah amount, unless otherwise stated)

             dieliminasi sebesar kepentingan Grup dalam                        are eliminated to the extent of the group’s
             ventura bersama. Kerugian yang belum                              interest in the joint ventures. Unrealized
             terealisasi juga dieliminasi kecuali transaksi                    losses are also eliminated unless
             tersebut memberikan bukti adanya penurunan                        the transaction provides evidence of
             nilai aset yang dialihkan. Kebijakan akuntansi                    an impairment of the asset transferred.
             ventura bersama telah diubah jika diperlukan                      Accounting policies of the joint ventures
             untuk memastikan konsistensi dari kebijakan                       have been changed where necessary to
             yang diterapkan oleh Grup.                                        ensure consistency with the policies
                                                                               adopted by the Group.

  cc. Obligasi Wajib Konversi                                        cc. Mandatory Convertible Bond

       Sesuai PSAK 50 Instrumen Keuangan pada paragraf                    In accordance with PSAK 50 Financial
       11 disebutkan ketika penerbit menerapkan definisi                  Instruments in paragraph 11, when the issuer
       untuk menentukan apakah instrumen keuangan                         applies the definition to determine whether
       merupakan instrumen ekuitas, dan bukan merupakan                   a financial instrument is an equity instrument,
       liabiltas keuangan, maka instrumen tersebut                        and not a financial liability, the instrument is an
       merupakan instrumen ekuitas jika dan hanya jika                    equity instrument if and only if both conditions
       kedua kondisi terpenuhi:                                           are met:

        a.    Instrumen tersebut tidak memiliki kewajiban                 a.   The instrument            has     no     contractual
              kontraktual:                                                     obligation:

              •   untuk menyerahkan kas atau aset keuangan                     •    to deliver cash or other financial assets
                  lain kepada entitas lain; atau                                    to another entity; or
              •   untuk mempertukarkan aset keuangan atau                      •    to exchange financial assets or
                  liabilitas keuangan dengan entitas lain                           financial liabilities with other entities on
                  dengan kondisi baik yang berpotensi tidak                         favorable terms that are potentially
                  menguntungkan penerbit.                                           unfavorable to the issuer.

        b.    Jika instrumen tersebut akan atau mungkin                   b.   If the instrument will or may be settled in
              diselesaikan dengan instrumen ekuitas yang                       the entity's own equity instruments,
              diterbitkan  entitas,  instrumen   tersebut                      the instrument is:
              merupakan:

              •   Nonderivatif yang tidak dimiliki kewajiban                   •    Non-derivatives that do not have a
                  kontraktual     bagi  penerbitnya   untuk                         contractual obligation for the issuer to
                  menyerahkan suatu jumlah yang bervariasi                          deliver a variable number of
                  dari instrumen ekuitas yang diterbitkan                           the entity's own equity instruments; or
                  entitas; atau
              •   Derivatif yang akan diselesaikan hanya                       •    A derivative that will be settled only by
                  dengan mempertukarkan sejumlah tertentu                           exchanging a specified amount of cash
                  kas atau aset keuangan lain dengan                                or another financial asset for a
                  sejumlah tertentu instrumen ekuitas yang                          specified number of equity instruments
                  diterbitkan entitas.                                              issued by the entity.

  dd. Investasi Jangka Panjang Lainnya                               dd. Other Long-Term Investment

       Merupakan investasi saham dengan kepemilikan                       Represent a shares investment with an
       kurang dari 20% atau tidak memiliki pengaruh                       ownership less than 20% or does not have
       signifikan yang pada awalnya diakui sebesar nilai                  significant influence that are recognized
       wajar sesuai dengan PSAK 71. Bukti terbaik dari nilai              initially at fair value according to PSAK 71.
       wajar adalah harga kuotasi di pasar aktif.                         The best evidence of fair value is the current
                                                                          market price quotations.

   ee. Laba per Saham                                                ee. Earnings per Share

       Laba per saham dasar dihitung dengan membagi laba                  Basic earnings per share is computed by
       bersih diatribusikan kepada pemegang saham biasa                   dividing net income attributable to the owner of
       entitas induk dengan jumlah rata-rata tertimbang                   the common shareholders parent entity by
       saham yang beredar dalam satu periode.

                                                          67
Page 71
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

                                                                            the weighted average number of shares
                                                                            outstanding during the period.

       Jika jumlah saham biasa atau instrumen keuangan                      If the number of ordinary shares or potential
       berpotensi saham biasa yang beredar meningkat                        financial instruments to be ordinary shares
       sebagai akibat dari kapitalisasi, penerbitan saham                   outstanding increases as a result of
       bonus atau pemecahan saham, atau menurun                             capitalisation, bonus issue or share split, or
       sebagai akibat dari penggabungan saham,                              decreases as a result of a reverse share split,
       perhitungan laba per saham dasar dan dilusian untuk                  the calculation of basic and diluted earnings
       seluruh periode yang disajikan harus disesuaikan                     per share for all periods presented shall be
       secara retrospektif.                                                 adjusted retrospectively.

       Jumlah rata-rata tertimbang saham beredar untuk                      The number of weighted average shares
       perhitungan laba per saham dasar adalah sebesar                      outstanding for the calculation of basic
       28.806.807.016 lembar pada tanggal 30 Juni 2023                      earnings    per   share     amounting      to
       dan 31 Desember 2022 (Catatan 47).                                   28,806,807,016 as of June 30, 2023 and
                                                                            December 31, 2022, respectively (Note 47).

   ff. Biaya Emisi Obligasi dan Saham                                 ff.   Bond and Shares Issuance Costs

       Biaya emisi obligasi merupakan biaya transaksi yang                  Bond issuance costs are transaction costs to
       harus dikurangkan langsung dari hasil emisi dalam                    be deducted from the proceeds in order to
       rangka menentukan hasil emisi bersih obligasi.                       determine the net proceeds of bonds.
       Selisih antara hasil emisi bersih dengan nilai nominal               The difference between the net proceeds and
       merupakan diskonto atau premium dan diamortisasi                     the nominal value is a discount or premium
       selama jangka waktu obligasi yang bersangkutan.                      and will be amortized over the term of
                                                                            the bonds.

       Biaya emisi saham disajikan sebagai bagian                           Share issuance costs are presented as a
       tambahan modal disetor dan tidak diamortisasi. Biaya                 deduction from the additional paid-in capital
       emisi saham disajikan sebagai pengurang dari                         and not amortized.
       tambahan modal disetor dan tidak diamortisasi.

   gg. Segmen Operasi                                                 gg. Operating Segment

       Grup menyajikan segmen operasi berdasarkan                           The Group presented operating segments
       informasi keuangan yang digunakan oleh pengambil                     based on the financial information used by
       keputusan operasional dalam menilai kinerja segmen                   the chief operating decision maker in
       dan menentukan alokasi sumber daya yang                              assessing the performance of segments and
       dimilikinya. Segmen didasarkan pada aktivitas dari                   in the allocation of resources. The segments
       setiap kegiatan operasi entitas legal di dalam Grup.                 are based on the activities of each operating
                                                                            legal entities within the Group.

       Segmen operasi adalah suatu komponen dari entitas:                   An operating segment is a component of
                                                                            the entity:

       •    yang terlibat dalam aktivitas bisnis yang                       •     that engages in business activities from
            memperoleh pendapatan dan menimbulkan                                 which it may earn revenues and incur
            beban (termasuk pendapatan dan beban yang                             expenses (including revenues and
            terkait dengan transaksi dengan komponen lain                         expenses relating to the transactions with
            dari entitas yang sama);                                              other components of the same entity);
       •    yang hasil operasinya dikaji ulang secara regular               •     whose operating results are regularly
            oleh pengambil keputusan operasional untuk                            reviewed by chief operating decision
            membuat keputusan tentang sumber daya yang                            maker to make decisions about resources
            dialokasikan pada segmen tersebut dan menilai                         to be allocated to the segment and
            kinerjanya; dan                                                       assesses its performance; and
       •    yang informasi keuangan yang terpisah miliknya                  •     for which separate financial information is
            tersedia.                                                             available.




                                                          68
Page 72
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

  hh. Sumber     Ketidakpastian    Estimasi               dan      hh. Source of Estimation Uncertainty                           and
      Pertimbangan Akuntansi Penting                                   Critical Accounting Judgements

       Dalam penerapan kebijakan akuntansi Grup diatas,                   In the application of the Group’s accounting
       Direksi diwajibkan untuk membuat penilaian, estimasi               policies above, the Directors are required to
       dan asumsi tentang jumlah tercatat aset dan liabilitas             make judgments, estimates and assumptions
       yang tidak tersedia dari sumber lain. Estimasi dan                 about the carrying amounts of assets and
       asumsi yang terkait didasarkan pada pengalaman                     liabilities that are not readily apparent from
       historis dan faktor-faktor lain yang dianggap relevan.             other sources. The estimates and associated
       Hasil aktualnya mungkin berbeda dari estimasi                      assumptions are based on historical
       tersebut.                                                          experience and other factors that are
                                                                          considered to be relevant. Actual results may
                                                                          differ from these estimates.

       Estimasi dan asumsi yang mendasari ditelaah secara                 The estimates and underlying assumptions are
       berkelanjutan. Revisi estimasi akuntansi diakui dalam              reviewed on an ongoing basis. Revisions to
       periode yang perkiraan tersebut direvisi jika revisi               accounting estimates are recognized in
       hanya mempengaruhi periode itu, atau pada periode                  the period which the estimate is revised if
       revisi dan periode masa depan jika revisi                          the revision affects only that period, or in the
       mempengaruhi kedua periode saat ini dan masa                       period of the revision and future periods if the
       depan.                                                             revision affects both current and future periods.

       Pertimbangan Kritis dalam Penerapan Kebijakan                      Critical Judgments in Applying Accounting
       Akuntansi                                                          Policies

       Dalam proses penerapan kebijakan akuntansi yang                    In the process of applying the accounting
       dijelaskan diatas, terdapat pertimbangan kritis yang               policies as described above, management has
       memiliki dampak signifikan pada jumlah yang diakui                 made any critical judgments that has significant
       dalam laporan keuangan konsolidasian, selain dari                  impact on the amounts recognized in
       penyajian perkiraan yang diatur di bawah ini.                      the consolidated financial statements, apart
                                                                          from those involving estimates, which are dealt
                                                                          with below.

       Perjanjian Konsesi Jasa                                            Service Concession Arrangement

        ISAK    16    menjelaskan      pendekatan    untuk                ISAK 16 outlines an approach to account for
       membukukan perjanjian konsesi jasa akibat dari                     service concession arrangement arising from
       penyediaan jasa kepada publik. ISAK 16 mengatur                    entities providing public services. It provides
       bahwa operator (pihak penerima konsesi jasa) tidak                 that the operator (concession right beneficiary)
       membukukan infrastruktur sebagai aset tetap, namun                 should not account for the infrastructure as
       diakui sebagai aset keuangan dan/atau aset tak                     property and equipment, but should be
       berwujud. Badan Pengatur Jalan Tol (BPJT)                          recognized as a financial asset and/or an
       memberikan hak, kewajiban dan keistimewaan                         intangible asset. Indonesia Toll Road Authority
       kepada Grup termasuk kewenangan dalam                              (BPJT) granted the Group the rights, obligations
       pendanaan, desain, konstruksi, operasi dan                         and privileges including the authority to finance,
       pemeliharaan jalan tol. Pada akhir masa konsesi jasa,              design, construct, operate and maintain the toll
       Grup harus menyerahkan jalan tol kepada BPJT                       roads. Upon expiry of the service concession
       tanpa biaya, dalam keadaan beroperasional dan                      period, the Group shall handover the toll roads
       kondisi yang baik, termasuk setiap dan semua tanah                 to the BPJT without cost, fully operational and
       yang diperlukan, pekerjaan, fasilitas jalan dan                    in good working condition, including any and all
       peralatan tol yang secara langsung berkaitan dan                   existing land, works, toll road facilities and
       berhubungan dengan pengoperasian fasilitas jalan                   equipment found therein directly related to, and
       tol.   Grup    berpendapat      bahwa     Perjanjian               in connection with, the operation of the toll road
       Pengusahaan Jalan Tol (PPJT) memenuhi kriteria                     facilities. The Group has made judgment that
       sebagai model aset tak berwujud, di mana aset                      the Toll Road Concession Agreement (PPJT)
       konsesi diakui sebagai aset tak berwujud sesuai                    qualifies under the intangible asset model,
       dengan PSAK 19, “Aset Tak Berwujud”.                               wherein the concession asset is recognized as
                                                                          an intangible asset in accordance with PSAK
                                                                          19, “Intangible Assets”.




                                                          69
Page 73
                                                                      The original consolidated financial statements included herein are in
                                                                                                                 the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                 PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                           AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                       FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                              AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                     MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                         (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)             (Expressed in full Rupiah amount, unless otherwise stated)

       WTR (entitas anak) yang memiliki hak pengusahaan                      WTR (subsidiary) who has the toll road
       jalan tol diharuskan oleh ISAK 16 untuk menyajikan                    concession is required by ISAK 16 to present an
       unsur pendapatan yang merefleksikan pendapatan                        income line reflecting the income from
       dari jasa konstruksi atas aset konsesi atau                           construction or improvements to concession
       peningkatan kemampuan aset konsesi yang                               assets    made       during the      period    in
       dilakukan selama periode berjalan pada laporan laba                   the consolidated statement of profit or loss and
       rugi     dan      penghasilan     komprehensif       lain             other comprehensive income. WTR recognizes
       konsolidasian.       WTR     mengakui       pendapatan                construction revenues of concession asset and
       konstruksi aset konsesi dan biaya konstruksi sesuai                   construction costs in accordance with PSAK 72.
       dengan PSAK 72. Entitas anak, WTR mengukur                            Subsidiary, WTR measures construction
       pendapatan konstruksi atas aset konsesi dengan                        revenues at cost with zero margin based on
       menggunakan metode biaya dengan marjin nol                            management estimation calculated by a certain
       berdasarkan estimasi terbaik manajemen yang                           model, in determining the initial toll road tariff
       dihitung dengan model tertentu pada saat penentuan                    before the toll road is operated.
       tarif awal jalan tol sebelum jalan tol dioperasikan.

       Sumber Ketidakpastian Estimasi                                        Key Sources of Estimation Uncertainty

       Rugi Penurunan Nilai Pinjaman yang Diberikan dan                     Impairment Loss on Loans and Receivables
       Piutang

       Grup menilai penurunan nilai pinjaman yang diberikan                 The Group assesses its loans and receivables
       dan piutang pada setiap tanggal pelaporan. Nilai                     for impairment at each reporting date. The fair
       wajar piutang ditentukan dengan memperhitungkan                      value of accounts receivable is determined by
       penurunan nilai yang bersifat permanen dan nilai                     calculating the permanent impairment and
       tercatatnya dikurangi untuk mengakui penurunan                       the carrying value is reduced to recognize
       tersebut. Asumsi yang digunakan untuk menentukan                     the decline. The assumptions used to determine
       penyisihan penurunan nilai piutang didasarkan                        the allowance for impairment of receivables
       penilaian secara individual atas piutang masing-                     based on an individual assessment of each
       masing debitur (pemberi kerja).                                      receivable debtor (employer).

       Taksiran Masa Manfaat Ekonomis Aset Tetap                            Estimated Useful            Lives     of    Property      and
                                                                            Equipment

        Masa manfaat setiap aset tetap Grup ditentukan                      The useful life of each item of the Group’s
       berdasarkan kegunaan yang diharapkan dari                            property and equipment are estimated based on
       penggunaan aset tersebut. Estimasi ini ditentukan                    the period over which the asset is expected to be
       berdasarkan evaluasi teknis internal dan pengalaman                  available for use. Such estimation is based on
       atas aset sejenis. Masa manfaat setiap aset direviu                  internal technical evaluation and experience with
       secara periodik dan disesuaikan apabila prakiraan                    similar assets. The estimated useful life of each
       berbeda dengan estimasi sebelumnya karena                            asset is reviewed periodically and updated if
       keausan, keusangan teknis dan komersial, hukum                       expectations differ from previous estimates due
       atau keterbatasan lainnya atas pemakaian aset.                       to physical wear and tear, technical or
       Namun terdapat kemungkinan bahwa hasil operasi                       commercial obsolescence and legal or other
       dimasa mendatang dapat dipengaruhi secara                            limits on the use of the asset. It is possible,
       signifikan oleh perubahan atas jumlah serta periode                  however, that future results of operations could
       pencatatan biaya yang diakibatkan oleh perubahan                     be materially affected by changes in
       faktor yang disebutkan di atas.                                      the amounts and timing of recorded expenses
                                                                            brought about by changes in the factors
                                                                            mentioned above.

       Perubahan masa manfaat aset tetap dapat                              A change in the estimated useful life of any item
       mempengaruhi jumlah biaya penyusutan yang diakui                     of property and equipment would affect
       dan penurunan nilai tercatat aset tetap.                             the recorded depreciation expense and
                                                                            decrease in the carrying values of property and
                                                                            equipment.




                                                            70
Page 74
                                                                  The original consolidated financial statements included herein are in
                                                                                                             the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                             PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                       AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                         NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                   FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                          AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                 MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                     (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)         (Expressed in full Rupiah amount, unless otherwise stated)

       Provisi Pelapisan Jalan Tol                                      Provision for Overlay

       Biaya pelapisan ini akan dicadangkan secara berkala              The provision for overlay is detemined
       berdasarkan estimasi seiring dengan penggunaan                   periodically based on the estimated utilization of
       jalan tol oleh pelanggan. Provisi diukur dengan nilai            toll road by customers. This provision is
       kini atas estimasi manajemen terhadap pengeluaran                measured using the present value of
       yang diperlukan untuk menyelesaikan liabilitas kini              the management‘s estimate of the expenditures
       pada tanggal pelaporan.                                          required to settle present obligation at the
                                                                        reporting date.

       Liabilitas Imbalan Pasca Kerja                                   Post-Employment Benefits Obligation

       Nilai kini liabilitas imbalan pasca kerja tergantung             The present value of post-employment benefit
       pada beberapa faktor yang ditentukan dengan dasar                liabilities depends on several factors which are
       aktuarial berdasarkan beberapa asumsi. Asumsi yang               determined by actuarial basis based on several
       digunakan untuk menentukan biaya (penghasilan)                   assumptions. Assumptions used to determine
       pensiun neto mencakup tingkat diskonto. Perubahan                pensions cost (benefits) covered discount rate.
       asumsi ini akan mempengaruhi jumlah tercatat                     The changes of assumptions might affect
       imbalan pasca kerja.                                             carrying value of post-employment benefits.

       Grup menentukan tingkat diskonto yang sesuai pada                The Group determines the appropriate discount
       akhir pelaporan, dengan mempertimbangkan tingkat                 rate at the final reporting, by considering
       suku bunga obligasi pemerintah yang didenominasi                 the discount rate of government’s bond which
       dalam mata uang imbalan yang akan dibayar dan                    denominated in benefit’s currency that will be
       memiliki jangka waktu yang serupa dengan jangka                  paid and have a similar term with the terms of
       waktu liabilitas yang terkait.                                   the related liabilities.

       Pajak Penghasilan Final                                          Final Income Tax

       Pajak penghasilan dari aktivitas jasa konstruksi                 Income tax from construction is computed based
       dihitung berdasarkan Peraturan Pemerintah (PP)                   on    the    Government      Regulation   (PP)
       No. 40 tahun 2009 mengenai perubahan atas                        No. 40 year 2009 concerning amendments of
       PP No. 51 tahun 2008 tentang pajak penghasilan atas              Government Regulation No. 51 year 2008
       penghasilan dari usaha jasa konstruksi yang berlaku              concerning income tax from the construction
       efektif mulai tanggal 1 Agustus 2008, dimana                     business that is effective starting August 1,
       perlakuan pengenaan pajak final dikenakan atas                   2008, where the final tax at 3% is applied for
       kontrak sebesar 3% yang diperoleh mulai tanggal                  contract signed starting August 1, 2008.
       1 Agustus 2008.

       Pada tahun 2022, Pemerintah mengeluarkan                         In 2022, the Indonesian Government issued
       Peraturan Pemerintah Nomor 9 Tahun 2022 tentang                  Government Regulation No. 9 Year 2022
       Perubahan Kedua atas Peraturan Pemerintah Nomor                  (“PP No. 9/2022”) concerning Second
       51 Tahun 2008 tentang Pajak Penghasilan atas                     Amendment of Government Regulation No. 51
       Penghasilan dari Usaha Jasa Konstruksi. Melalui                  Year 2008 concerning Income Tax on Income
       peraturan ini, Pemerintah memutuskan beberapa                    from     Construction     Services       Business.
       kebijakan baru dan salah satunya terkait dengan                  Through this regulation, the Government issued
       penyesuaian tarif pajak penghasilan final menjadi                some new policies, one of which is
       sebesar 2,65% yang mulai berlaku pada tanggal 21                 related to the adjustment of the final income tax
       Februari 2022 dan seterusnya.                                    rate to 2.65% which is effective on February 21,
                                                                        2022 onwards.

       Pajak penghasilan final disajikan di luar beban pajak            Final income tax is presented outside of
       penghasilan pada laba rugi.                                      the income tax expenses in profit or loss.

       Perbedaan nilai tercatat aset atau liabilitas yang               The difference between the final income tax
       berhubungan dengan pajak penghasilan final dengan                carrying amounts of existing assets and
       dasar pengenaan pajaknya tidak diakui sebagai aset               liabilities, and their respective final tax bases are
       atau liabilitas pajak tangguhan.                                 not recognized as deferred tax assets or
                                                                        liabilities.



                                                          71
Page 75
                                                                  The original consolidated financial statements included herein are in
                                                                                                             the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                             PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                       AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                         NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                   FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                          AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                 MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                     (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)         (Expressed in full Rupiah amount, unless otherwise stated)

       Penurunan Nilai atas Goodwill                                    Impairment of Goodwill

       Uji penurunan nilai goodwill wajib dilakukan                     Impairment testing of goodwill is required to be
       sedikitnya setahun sekali tanpa memperhatikan                    performed at least annually irrespective of
       apakah telah terjadi indikasi penurunan nilai.                   whether or not there are indications of
       Penentuan nilai pakai aset tak berwujud                          impairment. Determining the value in use of
       membutuhkan estimasi arus kas yang diharapkan                    intangible assets requires the estimation of cash
       akan dihasilkan dari pemakaian berkelanjutan dan                 flows expected to be generated from
       pelepasan akhir atas aset tersebut serta tingkat                 the continued use and ultimate disposition of
       diskonto yang tepat untuk menghitung nilai kini.                 such assets and a suitable discount rate in order
                                                                        to calculate the present value.

       Manajemen berkeyakinan bahwa asumsi-asumsi                        While it is believed that the assumptions used in
       yang digunakan dalam estimasi nilai pakai dalam                   the estimation of the value in use of assets
       laporan keuangan konsolidasian adalah tepat dan                   reflected in the consolidated financial
       wajar, namun demikian, perubahan signifikan dalam                 statements are appropriate and reasonable,
       asumsi-asumsi tersebut dapat berdampak signifikan                 significant changes in this assumptions may
       pada jumlah nilai terpulihkan dan jumlah kerugian                 materially affect the assessment of recoverable
       penurunan nilai yang terjadi mungkin berdampak                    values and any resulting impairment loss could
       material pada hasil operasi Grup.                                 have a material adverse impact on the results of
                                                                         Group’s operations.

       Penilaian Instrumen Keuangan                                      Valuation of Financial Instruments

       Seperti dijelaskan dalam Catatan 56, Grup                         As described in Note 56, the Group uses
       menggunakan teknik penilaian yang meliputi input                  valuation techniques that include inputs that are
       yang tidak didasarkan pada data pasar yang dapat                  not based on observable market data to
       diobservasi untuk mengestimasi nilai wajar dari                   estimate the fair value of certain types of
       beberapa jenis instrumen keuangan.                                financial instruments.

       Direksi berpendapat bahwa teknik penilaian yang                   The directors believe that the chosen valuation
       dipilih dan asumsi yang digunakan adalah tepat                    techniques and assumptions used are
       dalam menentukan nilai wajar dari instrumen                       appropriate in determining the fair value of
       keuangan.                                                         financial instruments.

       Arus Kas Masa Depan dari Perjanjian Jasa Konsesi                  Future Cash Flows from Service Concession
                                                                         Arrangement

       WSE menilai aset keuangannya dari proyek konsesi                  WSE assesses its financial asset from
       pada setiap tanggal pelaporan. Manajemen membuat                  concession project at each reporting date.
       penilaian mengenai metodologi dan asumsi untuk                    Management makes judgment as to the
       memperkirakan jumlah dan waktu arus kas masa                      methodology and assumptions for estimating
       depan dari pembayaran kapasitas. Nilai tercatat aset              the amount and timing of future cash flows of
       keuangan dari proyek konsesi diungkapkan pada                     capacity payments. The carrying amount of
       Catatan 21.                                                       financial asset from concession project is
                                                                         disclosed in Note 21.




                                                          72
Page 76
                                                                                      The original consolidated financial statements included herein are in
                                                                                                                                 the Indonesian language.


 PT WASKITA KARYA (PERSERO) TBK                                                              PT WASKITA KARYA (PERSERO) TBK
 DAN ENTITAS ANAK                                                                                        AND ITS SUBSIDIARIES
 CATATAN ATAS LAPORAN KEUANGAN                                                          NOTES TO THE INTERIM CONSOLIDATED
 KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
 31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                           AND DECEMBER 31, 2022 AND FOR THE SIX
 ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
 (2022 – DIAUDIT) – Lanjutan                                                                      (2022 – AUDITED) – Continued
 (Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                          (Expressed in full Rupiah amount, unless otherwise stated)

3.   KAS DAN SETARA KAS DAN KAS YANG DIBATASI                                    3.    CASH AND CASH                        EQUIVALENTS             AND
     PENGGUNAANNYA                                                                     RESTRICTED CASH

                                                                                                               30 Juni/               31 Desember/
                                                                                                            June 30, 2023          December 31, 2022 *)
                                                                                                                 Rp                        Rp

      Kas/ Cash on Hand                                                                                          2.543.363.303              2.478.108.219
      Bank/ Cash in Banks
       Pihak Berelasi/ Related Parties
        Rupiah Indonesia/ Indonesian Rupiah
         PT Bank Negara Indonesia (Persero) Tbk                                                                447.803.724.756           218.509.480.344
         PT Bank Rakyat Indonesia (Persero) Tbk                                                                323.437.035.289            49.410.874.740
         PT Bank Tabungan Negara (Persero) Tbk                                                                 209.499.688.255            80.578.756.742
         PT Bank Mandiri (Persero) Tbk                                                                         152.139.953.553           346.621.217.654
         PT Bank Syariah Indonesia Tbk (d/h/ formerly PT Bank Syariah Mandiri)                                   2.779.636.353             1.333.861.986
         Bank Tabungan Negara Syariah                                                                               96.447.323                         --
         PT Bank Syariah Indonesia Tbk (d/h/ formerly PT Bank BNI Syariah)                                          59.373.944                72.945.895
         PT Bank Syariah Indonesia Tbk (d/h/ formerly PT Bank BRI Syariah Tbk)                                      11.063.592                11.093.592
        Dolar Amerika Serikat/ United States Dollar
         PT Bank Mandiri (Persero) Tbk                                                                         256.108.514.669             81.691.702.820
         PT Bank Rakyat Indonesia (Persero) Tbk                                                                 51.885.347.185                982.325.756
         PT Bank Negara Indonesia (Persero) Tbk                                                                    200.281.404                564.529.747
        Yen Jepang/ Japanese Yen
         PT Bank Negara Indonesia (Persero) Tbk                                                                 29.752.296.389             35.809.130.827
        Euro
         PT Bank Mandiri (Persero) Tbk                                                                                9.020.928                56.980.208
      Sub Jumlah/ Sub Total                                                                                  1.473.782.383.640           815.642.900.310
       Pihak Ketiga/ Third Parties
       Rupiah Indonesia/ Indonesian Rupiah
        PT Bank Central Asia Tbk                                                                                19.040.435.020            13.344.638.427
        PT Bank Pembangunan Daerah Jawa Barat dan Banten Tbk                                                    15.665.250.848           406.666.351.737
        PT Bank CIMB Niaga Tbk                                                                                   2.815.297.630            22.182.108.527
        Bank Artha Graha Internasional                                                                           2.494.395.593             2.494.575.593
        PT Bank Permata Tbk                                                                                        491.722.760                 6.312.135
        PT Bank OCBC NISP Tbk                                                                                      314.634.931                77.915.235
        Kospin Jasa                                                                                                189.170.303                         --
        BPD Sulsel                                                                                                 176.330.631                         --
        PT Bank DKI                                                                                                 70.546.202                71.081.452
        PT Bank BCA Syariah                                                                                         53.366.149                53.310.388
        PT Bank Jtrust Indonesia Tbk                                                                                51.852.737                52.027.430
        PT Bank UOB Indonesia                                                                                       44.851.120               368.774.036
        PT Bank ICBC Indonesia                                                                                      40.870.967                40.645.111
        PT Bank Mestika Dharma Tbk                                                                                  33.497.367                33.842.263
        PT Bank Maybank Indonesia Tbk                                                                               23.674.489             1.294.367.436
        PT Bank Pembangunan Daerah Bali                                                                             22.031.114                         --
        Bank BPR Intidana                                                                                            9.102.037                         --
        PT Bank Woori Saudara Indonesia 1906 Tbk                                                                     5.846.000                         --
        PT Bank KB Bukopin Tbk                                                                                       5.208.977            20.092.647.457
        PT Bank Mega Tbk                                                                                             4.729.691                 5.029.264
        PT Bank CTBC Indonesia                                                                                       2.864.964                 3.145.091
        Bank Sumitomo Mitsui Indonesia                                                                                 726.319                   777.928
        PT Bank CIMB Niaga Tbk - Unit Usaha/ Business Unit Syariah                                                           --              122.221.011
        PT Bank KB Bukopin Syariah                                                                                           --                2.948.654
        PT Bank DBS Indonesia                                                                                                --           16.739.543.842
        PT Bank Danamon Tbk                                                                                                  --               30.752.929
       Riyal Arab Saudi/ Saudi Arabian Riyal
        The National Commercial Bank - Jeddah                                                                        41.353.012                          --
       Ringgit Malaysia/ Malaysian Ringgit
        PT Bank Maybank Indonesia Tbk                                                                                12.328.016                12.328.016
      Sub Jumlah/ Sub Total                                                                                     41.610.086.877           483.695.343.962
      Deposito Berjangka/ Time Deposits
       Pihak Berelasi/ Related Parties (Note 54)
        Rupiah Indonesia/ Indonesian Rupiah
         PT Bank Mandiri Taspen                                                                                 85.000.000.000                         --
         PT Bank Rakyat Indonesia (Persero) Tbk                                                                 47.700.000.000           489.406.548.650
         PT Bank Tabungan Negara (Persero) Tbk- Unit Usaha Syariah                                              23.000.000.000                         --
         PT Bank Mandiri (Persero) Tbk                                                                          15.005.000.000            78.005.000.000
         PT Bank Tabungan Negara (Persero) Tbk                                                                  10.313.380.000             3.000.000.000
         PT Bank Negara Indonesia (Persero) Tbk                                                                    125.000.000           342.313.380.000
      Sub Jumlah/ Sub Total                                                                                    181.143.380.000           912.724.928.650




                                                                         73
Page 77
                                                                                       The original consolidated financial statements included herein are in
                                                                                                                                  the Indonesian language.


 PT WASKITA KARYA (PERSERO) TBK                                                               PT WASKITA KARYA (PERSERO) TBK
 DAN ENTITAS ANAK                                                                                         AND ITS SUBSIDIARIES
 CATATAN ATAS LAPORAN KEUANGAN                                                           NOTES TO THE INTERIM CONSOLIDATED
 KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                                     FINANCIAL STATEMENTS AS OF JUNE 30, 2023
 31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                            AND DECEMBER 31, 2022 AND FOR THE SIX
 ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                                   MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
 (2022 – DIAUDIT) – Lanjutan                                                                       (2022 – AUDITED) – Continued
 (Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                            (Expressed in full Rupiah amount, unless otherwise stated)

                                                                                                                30 Juni/                 31 Desember/
                                                                                                             June 30, 2023            December 31, 2022 *)
                                                                                                                  Rp                          Rp
      Pihak Ketiga/ Third Parties
       Rupiah Indonesia/ Indonesian Rupiah
        Kospin Jasa                                                                                              19.000.000.000                            --
        PT Bank Pembangunan Daerah Jawa Barat dan Banten Tbk                                                      3.000.000.000                7.000.000.000
        PT Bank Woori Saudara Indonesia 1906 Tbk.                                                                 3.000.000.000                            --
      Sub Jumlah/ Sub Total                                                                                      25.000.000.000                7.000.000.000
      Jumlah/ Total                                                                                           1.724.079.213.820           2.221.541.281.141
      Tingkat Suku Bunga Deposito Berjangka per Tahun (%)/
       Interest Rate of Time Deposits per Annum (%)                                                            1,9% - 2,75%                 1,9% - 4,5%
      Jangka Waktu/ Time Period                                                                            1 - 3 Bulan/ Months          1 - 3 Bulan/ Months

                                                                                                                30 Juni/                 31 Desember/
                                                                                                             June 30, 2023            December 31, 2022*)
                                                                                                                  Rp                          Rp
      Kas yang Dibatasi Penggunaannya/ Restricted of Cash
       Pihak Berelasi/ Related Parties
        Rupiah Indonesia/ Indonesian Rupiah
         PT Bank Mandiri (Persero) Tbk                                                                        1.868.394.560.353           1.985.823.404.202
         PT Bank Negara Indonesia (Persero) Tbk                                                               1.513.444.954.446           2.000.577.710.300
         PT Bank Rakyat Indonesia (Persero) Tbk                                                               1.386.739.512.350           2.411.190.936.708
         PT Bank Syariah Indonesia Tbk                                                                          158.619.797.749             176.746.993.569
         Indonesia Eximbank                                                                                           3.053.266                  98.663.648
         PT Bank Tabungan Negara (Persero) Tbk                                                                                --            260.915.617.997
      Jumlah/ Total                                                                                           4.927.201.878.164           6.835.353.326.425
       Pihak Ketiga/ Third Parties
       Rupiah Indonesia/ Indonesian Rupiah
        PT Bank DKI                                                                                               6.171.996.926                5.045.643.573
        PT Bank UOB Indonesia                                                                                     4.460.558.069                8.453.587.301
        PT Bank Maybank Indonesia Tbk                                                                             1.305.120.883                1.301.153.436
        PT Bank Pembangunan Daerah Jawa Barat dan Banten Tbk                                                        840.130.279                1.329.776.837
        PT Bank KB Bukopin Tbk                                                                                      338.301.334                   70.926.413
        PT Bank of China                                                                                            303.898.242                  302.743.972
        PT Bank CIMB Niaga Tbk - Unit Usaha/ Business Unit Syariah                                                  122.010.687                            --
        PT Bank Mega Tbk                                                                                             77.134.705                   56.795.725
        PT Bank OCBC NISP Tbk                                                                                        52.014.834                            --
        PT Bank Permata Tbk                                                                                          46.139.182                  536.012.011
        PT Bank CIMB Niaga Tbk                                                                                       44.640.426                            --
        PT Bank KB Bukopin Syariah                                                                                   40.471.735                   23.831.374
        PT Bank Pan Indonesia Tbk                                                                                    16.031.114                   16.561.114
        PT Bank BTPN Tbk                                                                                                 72.744                       85.152
       Riyal Arab Saudi/ Saudi Arabian Riyal
        The National Commercial Bank - Jeddah                                                                                    --               41.353.012
      Sub Jumlah/ Sub Total                                                                                      13.818.521.160               17.178.469.920
      Jumlah/ Total                                                                                           4.941.020.399.324           6.852.531.796.345


4.   INVESTASI JANGKA PENDEK                                                      4.   SHORT-TERM INVESTMENTS

                                                                30 Juni/             31 Desember/
                                                             June 30, 2023         December 31, 2022
                                                                  Rp                      Rp
      Deposito yang Dibatasi Penggunaannya                                                                                       Restricted of Time Deposit
       PT Bank Mandiri (Persero) Tbk                              8.448.200.000            8.448.200.000                     PT Bank Mandiri (Persero) Tbk
      Jumlah                                                      8.448.200.000            8.448.200.000                                                Total


     Deposito berjangka yang dibatasi penggunaannya                                     Restricted time deposits due three months until
     sampai dengan setahun dan sertifikat deposito berjangka                            one year and certificates of time deposits
     yang dijadikan jaminan atas pinjaman bank jangka                                   are pledged as collateral for long term bank loans
     panjang yaitu sebagai deposito yang dibatasi                                       (Note 31).
     penggunaannya (Catatan 31).




                                                                             74
Page 78
                                                                                         The original consolidated financial statements included herein are in
                                                                                                                                    the Indonesian language.


 PT WASKITA KARYA (PERSERO) TBK                                                                 PT WASKITA KARYA (PERSERO) TBK
 DAN ENTITAS ANAK                                                                                           AND ITS SUBSIDIARIES
 CATATAN ATAS LAPORAN KEUANGAN                                                             NOTES TO THE INTERIM CONSOLIDATED
 KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                                       FINANCIAL STATEMENTS AS OF JUNE 30, 2023
 31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                              AND DECEMBER 31, 2022 AND FOR THE SIX
 ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                                     MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
 (2022 – DIAUDIT) – Lanjutan                                                                         (2022 – AUDITED) – Continued
 (Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                             (Expressed in full Rupiah amount, unless otherwise stated)

5.   PIUTANG USAHA – BERSIH                                                         5.    ACCOUNTS RECEIVABLES – NET

                                                                  30 Juni/             31 Desember/
                                                               June 30, 2023         December 31, 2022
                                                                    Rp                      Rp
      Pihak Berelasi                                                                                                                              Related Parties
      Piutang Usaha Jasa Konstruksi - Bersih                    1.694.818.620.600         1.569.266.628.933                Construction Service Receivables - Net
      Dikurangi: Aset Keuangan                                                                                                              Less: Financial Asset
       Saling Hapus                                             (358.766.136.453)         (358.766.136.453)                                               Offset
      Piutang Dagang - Bersih                                     329.185.266.051           205.857.790.455                              Trade Receivables - Net
      Sub Jumlah                                                1.665.237.750.198         1.416.358.282.935                                            Sub Total
      Pihak Ketiga                                                                                                                                 Third Parties
      Piutang Usaha Jasa Konstruksi - Bersih                      249.380.993.800          196.936.902.199                 Construction Service Receivables - Net
      Piutang Dagang - Bersih                                     235.059.412.863          251.221.395.599                               Trade Receivables - Net
      Piutang Sewa                                                  4.161.728.633            2.777.624.986                                      Rent Receivables
      Sub Jumlah                                                  488.602.135.296          450.935.922.784                                             Sub Total
      Jumlah                                                    2.153.839.885.494         1.867.294.205.719                                                Total


     Rincian saldo piutang usaha jasa konstruksi tanpa                               The details of construction service receivables gross of
     cadangan kerugian penurunan nilai adalah sebagai                                allowance for impairment losses are as follows:
     berikut:

                                                                                                           30 Juni/                      31 Desember/
                                                                                                        June 30, 2023                  December 31, 2022
                                                                                                             Rp                               Rp
     Pihak Berelasi/ Related Parties
     PT Kresna Kusuma Dyandra Marga                                                                            460.867.784.183                 460.867.784.183
     PT Hutama Karya (Persero)                                                                                 417.278.604.078                 358.766.136.453
     PT Cibitung Tanjung priok Port Tollways                                                                   323.818.203.677                 164.958.420.369
     PT Hutama Marga Waskita                                                                                   274.625.938.636                 274.625.938.636
     PT Citra Karya Jabar Tol                                                                                  187.272.727.273                 187.272.727.273
     PT Cimanggis Cibitung Tollways                                                                            103.526.393.366                  42.235.388.903
     PT Kertas Leces (Persero)                                                                                  68.612.544.049                  68.612.544.049
     PT Angkasa Pura I (Persero)                                                                                47.750.228.772                  76.880.558.272
     PT Dok dan Perkapalan Kodja Bahari (Persero)                                                               26.260.305.600                  26.260.305.600
     PT Istaka Karya (Persero)                                                                                  22.527.353.440                  22.527.353.440
     Lain-lain/ Others (di bawah/ below Rp 20 Milyar/ Billion )                                                 62.513.680.501                  61.216.582.145
     Dikurangi: Penyisihan Kerugian Ekspektasian Penurunan Nilai Piutang Usaha/
      Less: Allowance For Impairment Expected Credit of Account Receivables                                   (300.235.142.975)               (174.957.110.390)
     Sub Jumlah/ Sub Total                                                                                    1.694.818.620.600              1.569.266.628.933
     Pihak Ketiga/ Third Parties
     Kementerian Pekerjaan Umum dan Perumahan Rakyat/
      The Ministry of Public Works and Housing                                                                 138.883.652.221                  54.297.887.218
     PT Broadbiz Asia                                                                                          106.596.781.459                 106.596.781.459
     PT Trikarya Graha Utama                                                                                   100.650.939.502                 100.650.939.502
     PT Bangun Investa Graha                                                                                    93.137.768.963                  93.137.768.963
     Pemerintah Daerah/ District Governments                                                                    53.710.681.966                  53.710.681.966
     Bin Ladin Contractor Group LLC                                                                             53.000.910.398                  53.000.910.398
     PT Amman Mineral Nusa Tenggara                                                                             30.291.174.713
     The Special Administrative Region of Oenuno - Timor Leste                                                  29.976.140.488                               --
     PT Royal Abadi Dentalindo                                                                                  28.286.313.824                  28.286.313.824
     Crown Prince Court                                                                                         13.363.666.936                  89.942.860.388
     Lain-lain/ Others (di bawah/ below Rp 20 Milyar/ Billion )                                                156.902.243.764                 160.101.863.105
     Dikurangi: Penyisihan Kerugian Ekspektasian Penurunan Nilai Piutang Usaha/
      Less: Allowance For Impairment Expected Credit of Account Receivables                                   (555.419.280.434)               (542.789.104.624)
     Sub Jumlah/ Sub Total                                                                                     249.380.993.800                 196.936.902.199
     Jumlah/ Total                                                                                            1.944.199.614.400              1.766.203.531.132




                                                                            75
Page 79
                                                                                      The original consolidated financial statements included herein are in
                                                                                                                                 the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                               PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                                         AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                           NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                                     FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                            AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                                   MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                                       (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                             (Expressed in full Rupiah amount, unless otherwise stated)

   Mutasi cadangan kerugian penurunan nilai piutang                                  The movements in allowance for impairment losses on
   usaha jasa konstruksi adalah sebagai berikut:                                     construction service receivables are as follows:

                                                              30 Juni/             31 Desember/
                                                           June 30, 2023         December 31, 2022
                                                                Rp                      Rp
    Saldo Awal                                              (717.746.215.014)       (1.088.340.052.860)                                  Beginning Balance
    Penambahan PSAK 71 Tahun Berjalan                        (47.558.169.452)          (31.057.411.804)                 Addition of PSAK 71 for Current Year
    Pemulihan PSAK 71 Tahun Berjalan                            8.831.398.262           444.759.701.488                Recovery of PSAK 71 for Current Year
    Pelepasan Entitas Anak                                                  --         (43.108.451.838)                           Divestment of Subsidiaries
    Reklasifikasi                                            (99.181.437.205)                         --                                   Reclassification
    Saldo Akhir                                             (855.654.423.409)        (717.746.215.014)                                      Ending Balance


   Pada tanggal 30 Juni 2023, terdapat penambahan                                    As of June 30, 2023, the additional value of allowance
   cadangan kerugian penurunan nilai piutang usaha jasa                              for impairment losses on construction services
   konstruksi yang berasal dari penambahan PSAK 71                                   receivable was came from addition related to PSAK 71
   tahun berjalan sebesar Rp47.558.169.452 dan                                       for current year amounting to Rp47,558,169,452, and
   pemulihan PSAK 71 tahun berjalan sebesar                                          recovery value of PSAK 71 for current year amounting
   Rp8.831.398.262 (Catatan 43).                                                     to Rp8,831,398,262, (Note 43).

   Pada tanggal 31 Desember 2022, terdapat                                           As of December 31, 2022, the additional value of
   penambahan cadangan kerugian penurunan nilai                                      allowance for impairment losses on construction
   piutang usaha jasa konstruksi yang berasal dari                                   services receivable was came from addition related to
   penambahan PSAK 71 tahun berjalan sebesar                                         PSAK 71 for current year amounting to
   Rp31.057.411.804 dan pemulihan PSAK 71 tahun                                      Rp31,057,411,804 and recovery value of PSAK 71 for
   berjalan sebesar Rp444.759.701.488 (Catatan 43).                                  current year amounting to Rp444,759,701,488
                                                                                     (Note 43).
   Manajemen berpendapat bahwa cadangan penurunan                                    The management believes that allowance for
   nilai piutang usaha jasa konstruksi adalah cukup untuk                            impairment losses on construction service receivables
   menutupi kerugian yang mungkin timbul dari tidak                                  is sufficient to cover the possible losses on
   tertagihnya piutang tersebut. Manajemen juga                                      uncollectible receivables. The management also
   berpendapat bahwa tidak terdapat risiko yang                                      believes that there is no significant risk concentration
   terkonsentrasi secara signifikan atas piutang usaha                               of credit risk on accounts receivable from one single
   pada satu pelanggan.                                                              customer.

   Rincian saldo piutang dagang - bersih sebagai berikut:                            The details of trade receivables - net are as follows:

                                                                                                              30 Juni/                31 Desember/
                                                                                                           June 30, 2023            December 31, 2022
                                                                                                                Rp                         Rp
     Pihak Berelasi/ Related Parties
      PT Kresna Kusuma Dyandra Marga                                                                          389.586.746.824             375.069.878.979
      PT Cimanggis Cibitung Tollways                                                                          141.304.953.567             187.243.533.947
      PT Hakaaston                                                                                             75.088.280.446              69.516.182.011
      PT Hutama Karya (Persero)                                                                                37.281.484.271              31.787.664.601
      KSO Adhi - Minarta                                                                                       29.799.570.600                           --
      PT Cibitung Tanjung Priok Tollways                                                                       19.231.943.021              35.367.504.982
      KSO/JO Waskita - Agung                                                                                    4.836.581.447              43.295.218.794
      Lain-lain/ Others (dibawah/ below Rp 20 Milyar/ Billion )                                               135.818.265.851             114.168.870.385
      Dikurangi: Penyisihan Kerugian Ekspektasian Penurunan Nilai Piutang Dagang/
       Less: Allowance For Impairment Expected Credit of Trade Receivables                                   (503.762.559.976)          (650.591.063.244)
     Sub Jumlah/ Sub Total                                                                                     329.185.266.051            205.857.790.455
     Pihak Ketiga/ Third Parties
      PT Semutama Langgeng                                                                                    435.000.000.000             435.000.000.000
      KSO/ JO RDMP Balikpapan                                                                                  26.839.562.704              26.839.562.704
      Pelanggan dari/ Customer from Solterra                                                                   25.501.849.794              25.022.978.395
      Pelanggan dari/ Customer from Teraskita Hotel & Office Cawang                                            12.943.118.930              18.430.843.908
      Lain-lain/ Others (dibawah/ below Rp 20 Milyar/ Billion )                                               248.104.553.702             248.207.996.243
      Dikurangi: Penyisihan Kerugian Ekspektasian Penurunan Nilai Piutang Dagang/
       Less: Allowance For Impairment Expected Credit of Trade Receivables                                   (513.329.672.267)          (502.279.985.651)
     Sub Jumlah/ Sub Total                                                                                    235.059.412.863             251.221.395.599
     Jumlah/ Total                                                                                            564.244.678.914             457.079.186.054




                                                                         76
Page 80
                                                                             The original consolidated financial statements included herein are in
                                                                                                                        the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                     PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                               AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                 NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                           FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                  AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                         MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                             (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                 (Expressed in full Rupiah amount, unless otherwise stated)

   Mutasi cadangan kerugian penurunan nilai piutang                           The movements in allowance for impairment losses
   dagang adalah sebagai berikut:                                             on trade receivables are as follows:

                                                    30 Juni/             31 Desember/
                                                 June 30, 2023         December 31, 2022
                                                      Rp                      Rp

       Saldo Awal                               (1.152.871.048.895)          (844.391.546.281)                                  Beginning Balance
       Pemulihan PSAK 71 Tahun Berjalan              36.597.379.447            390.679.081.161                Recovery of PSAK 71 for Current Year
       Penambahan PSAK 71 Tahun Berjalan                          --         (594.988.843.580)                 Addition of PSAK 71 for Current Year
       Pelepasan Entitas Anak                                     --         (104.169.740.195)                           Divestment of Subsidiaries
       Reklasifikasi                                 99.181.437.205                          --                                    Reclassification
       Saldo Akhir                              (1.017.092.232.243)         (1.152.871.048.895)                                    Ending Balance


   Pada tanggal 30 Juni 2023, tidak terdapat penambahan                       As of June 30, 2023, there is no additional value of
   cadangan kerugian penurunan nilai piutang dagang yang                      allowance for impairment losses on trade receivable
   berasal dari penambahan PSAK 71 tahun berjalan dan                         was came from addition related to PSAK 71 for
   nilai pemulihan PSAK 71 tahun berjalan adalah sebesar                      current year and recovery related to PSAK 71 for
   Rp36.597.379.447 (Catatan 43).                                             current year amounting to Rp36,597,379,447,
                                                                              (Note 43).

   Pada tanggal 31 Desember 2022, terdapat penambahan                         As of December 31, 2022, the additional value of
   cadangan kerugian penurunan nilai piutang dagang yang                      allowance for impairment losses on trade receivable
   berasal dari penambahan PSAK 71 tahun berjalan                             was came from addition related to PSAK 71 for
   sebesar Rp594.988.843.580 dan nilai pemulihan PSAK                         current year amounting to Rp594.988.843.580 and
   71 tahun berjalan adalah sebesar Rp390.679.081.161                         recovery related to PSAK 71 for current year
   (Catatan 43).                                                              amounting to Rp390,679,081,161 (Note 43).

   Analisa piutang usaha berdasarkan umur adalah sebagi                       The analyses of accounts receivable based on age
   berikut:                                                                   are as follow:

                                                    30 Juni/             31 Desember/
                                                 June 30, 2023         December 31, 2022
                                                      Rp                      Rp

       Belum Jatuh Tempo                         2.287.332.459.332          2.076.031.303.646                                           Not Yet Due
       Sudah Jatuh Tempo                                                                                                                   Past Due
        Sampai dengan 12 Bulan                    109.487.208.963              23.212.573.936                                      Up to 12 Months
        > 13 - 24 Bulan                           441.055.208.321             701.073.958.828                                      >13 - 24 Months
        > 25 - 36 Bulan                           603.948.645.078             380.152.879.103                                      >25 - 36 Months
        > 36 Bulan                                584.763.019.452             557.440.754.115                                          >36 Months
       Jumlah                                    4.026.586.541.146          3.737.911.469.628                                                  Total


   Piutang usaha dijaminkan pada bank-bank pemberi                       Account receivables are pledge as a collateral for long-
   pinjaman jangka panjang (Catatan 31), dengan rincian                  term bank loans (Note 31), with details as follows :
   sebagai berikut:

   •     PT Bank Negara Indonesia (Persero) Tbk, piutang                •      PT Bank Negara Indonesia (Persero) Tbk,
         usaha yang dijaminkan terhadap proyek yaitu                           accounts receivable which are used as collateral
         tagihan termin atas Proyek Bendungan Jlantah                          consisting of terms of bill from Jlantah Dam Project
         sebesar Rp230.257.771.096, Proyek Light Rail                          amounting to Rp230,257,771,096, Light Rail Transit
         Transit    di  Sumatera     Selatan    sebesar                        Project in South Sumatra amounting to
         Rp266.561.080.687, Proyek Jalan Tol Jakarta -                         Rp266,561,080,687, Jakarta - Cikampek II Sisi
         Cikampek II Sisi Selatan - Induk sebesar                              Selatan - Induk Toll Road Project amounting to
         Rp1.801.679.984.829, Proyek Jalan Tol Jakarta -                       Rp1,801,679,984,829, Jakarta - Cikampek II Toll
         Cikampek II Sisi Selatan - Peralatan sebesar                          Road Project Sisi Selatan - Peralatan
         Rp10.253.234.179, Proyek Jalan Tol Prabumulih –                       Rp10,253,234,179, Prabumulih – Muara Enim Toll
         Muara Enim sebesar Rp19.010.198.413 dan                               Road Project amounting to Rp19,010,198,413, and
         Proyek Pembangunan Jalan Tol Cibitung –                               Cibitung - Cilincing Toll Road Development Project
         Cilincing     sebesar       Rp881.950.875.747                         amounting to Rp881,950,875,747, (Note 31).
         (Catatan 31).




                                                              77
Page 81
                                                                    The original consolidated financial statements included herein are in
                                                                                                               the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                             PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                       AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                         NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                   FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                          AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                 MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                     (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)         (Expressed in full Rupiah amount, unless otherwise stated)

   •   PT Bank Mandiri (Persero) Tbk, piutang usaha             •     PT Bank Mandiri (Persero) Tbk, accounts
       yang dijaminkan terhadap proyek yaitu tagihan                  receivable which are used as collateral consisting
       termin atas Proyek Jalan Tol KAPB Paket I Seksi                of terms of bill from KAPB Toll Road Project
       1A sebesar Rp1.089.017.601.000, Proyek Jalan                   Package      I   Section     1A    amounting    to
       Tol KAPB Paket I Seksi 1B sebesar                              Rp1,089,017,601,000, KAPB Toll Road Project
       Rp570.893.009.427, Proyek Tol Bekasi Cawang                    Package      I   Section     1B    amounting    to
       Kp. Melayu seksi 2A sebesar Rp121.403.124.972,                 Rp570,893,009,427, Bekasi Cawang Toll Road
       Proyek     Tol    PPKA      Seksi    3  sebesar                Project Kp, Melayu section 2A amounting to
       Rp14.916.472.468, Proyek Rentang Irrigation                    Rp121,403,124,972, PPKA Toll Road Project
       Modernization            Project        sebesar                Section 3 amounting to Rp14,916,472,468, Range
       Rp160.304.328.136, Proyek Toll Cimanggis-                      Irrigation Modernization Project Project amounting
       Cibitung Seksi 2 sebesar Rp1.511.406.501.311,                  to Rp160,304,328,136, Cimanggis-Cibitung Toll
       Proyek Jembatan Kramasan - Kapal Betung                        Project      Section      2       amounting     to
       sebesar Rp445.196.463.277, Proyek Jembatan                     Rp1,511,406,501,311, Kramasan - Kapal Betung
       Musi      Tol      Kapal      Betung    sebesar                Bridge         Project        amounting         to
       Rp506.803.211.568, Proyek Tol Jakarta -                        Rp445,196,463,277, Musi Bridge Kapal Betung Toll
       Cikampek         II       Elevated      sebesar                Project amounting to Rp506,803,211,568, Jakarta -
       Rp82.720.926.414, Proyek Apron Bandara Sultan                  Cikampek II Elevated Toll Road Project amounting
       Hasanudin sebesar Rp11.565.656.418, Proyek                     to Rp82,720,926,414, Sultan Hasanudin Airport
       Crossing Taman Mekar- Sadang sebesar                           Apron          Project        amounting         to
       Rp3.115.078.700, Proyek Jalan & Kawasan                        Rp11,565,656,418, Crossing Taman Mekar –
       Industri Sadai sebesar Rp13.892.121.400, Proyek                Sadnagn          Project        amounting       to
       Tol Bakauheni – Terbanggi Besar Seksi 2 sebesar                Rp3,115,078,700, Sadai Road & Industrial Area
       Rp37.019.826.564 dan Proyek Rest Area Bakter                   Project     amounting     to     Rp13,892,121,400,
       Paket 2 sebesar Rp15.018.978.636 (Catatan 31).                 Bakauheni – Terbanggi Besar Toll Road Section 2
                                                                      Project amounting to Rp37,019,826,564 and Bakter
                                                                      Rest Area Project Package 2 amounting to
                                                                      Rp15,018,978,636 (Note 31).

   •    PT Bank Rakyat Indonesia (Persero) Tbk, piutang         •      PT Bank Rakyat Indonesia (Persero) Tbk,
        usaha yang dijaminkan terhadap proyek yaitu                    accounts receivable which are used as collateral
        tagihan termin atas Proyek Jalan SP. Blusuh –                  consisting of terms of bill from SP Road Project.
        Batas      Kalimantan       Tengah      sebesar                Blusuh – Batas Central Kalimantan amounting to
        Rp8.258.383.546, Proyek Jalan Tol KAPB Paket IV                Rp8,258,383,546, KAPB Package IV Section 2A
        Seksi 2A sebesar Rp96.535.240.128, Proyek Jalan                Toll     Road      Project       amounting     to
        Tol Terbanggi Besar - Kayu Agung (Zona KLB-2)                  Rp96,535,240,128, Terbanggi Besar - Kayu
        sebesar Rp129.527.863.157, Proyek Bandara                      Agung Toll Road Project (KLB-2 Zone) amounting
        Depati Amir sebesar Rp83.499.612.059, Proyek                   to Rp129,527,863,157, Depati Amir Airport
        Jalan Tol Becakayu Seksi 2a - Ujung sebesar                    Project    amounting     to     Rp83,499,612,059,
        Rp279.490.152.312, Proyek Koneksi Tol Becakayu                 Becakayu Toll Road Project Section 2a - Ujung
        - Wiyoto Wiyono sebesar Rp164.739.332.570,                     amounting to Rp279,490,152,312, Becakayu -
        Proyek    Infrastruktur   Pascapanen    sebesar                Wiyoto Wiyono Toll Road Connection Project
        Rp18.456.288.927, Proyek Jambi Sewer Sistem B2                 amounting to Rp164,739,332,570, Postharvest
        sebesar Rp149.883.916.202, Proyek Jalan Tol                    Infrastructure     Project       amounting     to
        TBPP        VGF         Cisumdawu       sebesar                Rp18,456,288,927, Jambi Sewer System B2
        Rp331.818.181.818, Proyek Pengaman Pantai                      Project     Rp149,883,916,202,      TBPP     VGF
        KEK Tanjung Lesung Paket 1 sebesar                             Cisumdawu Toll Road Project amounting to
        Rp74.387.719.818, Proyek Jalan Tol Terbanggi                   Rp331,818,181,818, Package 1 SEZ Tanjung
        Besar - Kayu Agung (Zona KLB-1) sebesar                        Lesung Beach Protection Project amounting to
        Rp110.617.880.130, Proyek Apartement Solterra                  Rp74,387,719,818, Terbanggi Besar - Kayu
        Place sebesar Rp249.652.173.940 dan Proyek                     Agung Toll Road Project (KLB-1 Zone) amounting
        Jalan Tol Kayu Agung Palembang Betung Paket II                 to Rp110,617,880,130, Solterra Place Apartment
        Seksi     2A      sebesar     Rp781.958.527.716                Project amounting to Rp249,652,173,940, and
        (Catatan 31).                                                  Toll Road Project Kayu Agung Palembang Betung
                                                                       Package II Section 2A amounting to
                                                                       Rp781,958,527,716 (Note 31).




                                                          78
Page 82
                                                                     The original consolidated financial statements included herein are in
                                                                                                                the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                             PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                       AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                         NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                   FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                          AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                 MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                     (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)         (Expressed in full Rupiah amount, unless otherwise stated)

  •    PT Bank Syariah Indonesia Tbk piutang usaha yang          •       PT Bank Syariah Indonesia Tbk (formerly
       dijaminkan terhadap proyek yaitu tagihan termin atas              PT Bank Syariah Mandiri) accounts receivable
       Proyek         Apartemen      Solterra      sebesar               which are used as collateral consisting of terms of
       Rp249.652.173.940, Proyek Apartemen Yukata                        bill from Solterra Apartment Project amounting to
       Alam Sutera sebesar Rp31.855.680.790, Proyek                      Rp249,652,173,940, Yukata Alam Sutera
       Bandara Depati Amir sebesar Rp83.499.612.059,                     Apartment         Project      amounting         to
       Proyek Bendungan Bener Paket II (100%) sebesar                    Rp31,855,680,790, Depati Amir Airport Project
                                                                         amounting to Rp83.499.612.059, Bener Dam
       Rp341.811.934.864, Proyek Bendungan Jlantah
                                                                         Package II Project (100%) amounting to
       (65%)     sebesar     Rp230.257.771.096,     Proyek
                                                                         Rp341,811,934,864, Jlantah Dam Project (65%)
       Bendungan        Jragung    Paket      1    sebesar               amounting to Rp230,257,771,096, Jragung
       Rp568.484.258.621, Proyek Bendungan Rukoh                         Package 1 Dam Project amounting to
       sebesar      Rp348.505.907.888,     Proyek     IPAL               Rp568,484,258,621,        Rukoh    Dam      Project
       Palembang B2B sebesar Rp19.160.756.127, Proyek                    amounting to Rp348,505,907,888, , Palembang
       Jalan Tol Kayu Agung-Palembang-Betung II (Seksi 1                 B2B       WWTP       Project     amounting       to
       / Induk) sebesar Rp3.325.917.209.320, Proyek Jalan                Rp19.160.756.127, Kayu Agung-Palembang-
       Tol Kayu Agung-Palembang-Betung II (Seksi 2)                      Betung II Toll Road Project (Section 1 / Main)
       sebesar Rp1.646.239.879.277, Proyek Jalan Tol                     amounting to Rp3,325,917,209,320, Kayu Agung-
       Kayu Agung-Palembang-Betung IV (Seksi 2A)                         Palembang-Betung II Toll Road Project (Section
       sebesar Rp96.535.240.128, Proyek Jalan Tol Kayu                   2) amounting to Rp1,646,239,879,277, Kayu
       Agung-Palembang-Betung Paket I Seksi 1A sebesar                   Agung-Palembang-Betung IV Toll Road Project
       Rp1.089.017.601.000, Proyek Jalan Tol KLBM Seksi                  (Section 2A) amounting to Rp96,535,240,128,
       1 sebesar Rp214.060.503.948, Proyek Jalan Tol                     Kayu Agung-Palembang-Betung Toll Road
                                                                         Project Package I Section 1A amounting to
       KLBM Seksi 2 sebesar Rp551.199.789.419, Proyek
                                                                         Rp1,089,017,601,000, KLBM Toll Road Project
       Jalan Tol Pasuruan - Probolinggo (General) sebesar
                                                                         Section 1 amounting to Rp214.060.503.948,
       Rp79.972.476.773, Proyek Jalan Tol Pasuruan -                     KLBM Toll Road Project Section 2 amounting to
       Probolinggo (Seksi 2) sebesar Rp34.122.500.372,                   Rp551.199.789.419, Pasuruan - Probolinggo
       Proyek Jalan Tol Ruas Colomadu – Karanganyar                      (General) Toll Road Project amounting to
       sebesar Rp530.074.185, Proyek Jembatan Ogan -                     Rp79,972,476,773, Pasuruan - Probolinggo Toll
       Kapal Betung sebesar Rp1.264.362.283.911, Proyek                  Road Project (Section 2) amounting to
       Jln Tol Tebing Tinggi - Parapat tahap 1 (Zona 1)                  Rp34,122,500,372, Colomadu - Karanganyar Toll
       sebesar Rp111.696.745.293, Proyek Jln Tol Tebing                  Road Project amounting to Rp530,074,185, The
       Tinggi - Parapat tahap 1 (Zona 1A) sebesar                        Ogan - Kapal Betung Bridge Project amounting to
       Rp146.719.896.908, Proyek Jln Tol Tebing Tinggi -                 Rp1,264,362,283,911, Tebing Tinggi - Parapat
       Parapat      tahap     1   (Zona      2)    sebesar               Toll Road Project phase 1 (Zone 1) amounting to
       Rp108.362.365.041, Proyek Jln Tol Tebing Tinggi -                 Rp111,696,745,293, Tebing Tinggi - Parapat Toll
       Parapat      tahap     1   (Zona      3)    sebesar               Road Project phase 1 (Zone 1A) amounting to
       Rp147.723.739.892, Proyek Jln Tol Tebing Tinggi -                 Rp146,719,896,908, Tebing Tinggi - Parapat Toll
                                                                         Road Project phase 1 (Zone 2) amounting to
       Parapat      tahap     1   (Zona      4)    sebesar
                                                                         Rp108,362,365,041, Tebing Tinggi - Parapat Toll
       Rp200.543.683.620, Proyek Jln Tol Terbanggi -
                                                                         Road Project phase 1 (Zone 3) amounting to
       Pematang Panggang (VGF JJS 1) sebesar                             Rp147,723,739,892, Tebing Tinggi Toll Road -
       Rp70.654.401.064, Proyek Jln Tol Terbanggi -                      Parapat Project stage 1 (Zone 4) amounting to
       Pematang Panggang (VGF JJS 2) sebesar                             Rp200,543,683,620, Terbanggi - Pematang
       Rp90.659.605.938, Proyek LRT Sumsel (General)                     Panggang Toll Road Project (VGF JJS 1)
       sebesar Rp266.561.080.687, Proyek Nines Plaza &                   amounting to Rp70,654,401,064, Terbanggi -
       Residence sebesar Rp337.942.464.435, Proyek                       Pematang Panggang Toll Road Project (VGF JJS
       Pabrik Baja WKI Cikande – Serang sebesar                          2) amounting to Rp90,659,605,938, South
       Rp13.709.293.296, Proyek Pembangunan Gardu                        Sumatra LRT Project (General) amounting to
       Induk Tegangan Ekstra Tinggi 500 KV Peranap                       Rp266,561,080,687, Nines Plaza & Residence
       (46%)      sebesar     Rp29.217.603.854,     Proyek               Project amounting to Rp337,942,464,435, WKI
       Perluasan Terminal T1 Bandara Juanda sebesar                      Cikande – Serang Steel Factory Project
       Rp95.043.965.331, Proyek Paket 1 Transmisi 500                    amounting to Rp13,709,293,296, 500 KV Peranap
       KV: New Aur Duri – Peranap (Atas) sebesar                         (46%)      Extra    High    Voltage     Substation
                                                                         Development         Project     amounting        to
       Rp250.398.538.484, Proyek Pkt. 2 Trans. 500 KV:
                                                                         Rp29,217,603,854, Expansion Terminal T1
       Peranap       -    Perawang    (Tanah)      sebesar
                                                                         Juanda      Airport    Project    amounting      to
       Rp12.922.554.175, Proyek Rest Area Bakter Paket 2                 Rp95,043,965,331, Transmission 500 KV: New
       sebesar Rp15.018.978.636, Proyek SUTT 150 KV                      Aur Duri - Peranap (Above) Project Package 1
       Sangatta      -    Maloy   Section     3    sebesar               amounting to Rp250,398,538,484, Project

                                                          79
Page 83
                                                                  The original consolidated financial statements included herein are in
                                                                                                             the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                             PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                       AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                         NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                   FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                          AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                 MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                     (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)         (Expressed in full Rupiah amount, unless otherwise stated)

       Rp50.748.354.004, Proyek Terminal Bandara                      Transmission 500 KV: Peranap - Perawang
       Internasional         Minangkabau            sebesar           (Land)      Package       2     amounting       to
       Rp129.069.031.660, Proyek Tol Becakayu Koneksi                 Rp12,922,554,175, Bakter Rest Area Project
       Wiyoto Wiyono sebesar Rp164.739.332.572, Proyek                Package 2 amounting to Rp15,018,978,636,
       Tol      Becakayu        Seksi      2A       sebesar           SUTT 150 kV Sangatta - Maloy Project Section 3
       Rp121.403.124.974, Proyek Tol Becakayu Seksi 2A                amounting to Rp50,748,354,004, Minangkabau
       Ujung sebesar Rp279.490.152.312, Proyek Tol                    International Airport Terminal Project amounting
                                                                      to     Rp129,069,031,660,      Wiyoto      Wiyono
       Ciawi     -    Sukabumi      Seksi     2     sebesar
                                                                      Connection Becakayu Toll Road Project
       Rp1.758.862.573.023, Proyek Tol          Cibitung -
                                                                      amounting to Rp164,739,332,572, Becakayu Toll
       Cilincing Seksi 1 sebesar Rp349.622.715.534,                   Road Section 2A Project amounting to
       Proyek Tol Cibitung - Cilincing Seksi 2 sebesar                Rp121,403,124,974, Becakayu Toll Road Project
       Rp532.328.160.213, Proyek Tol Cimanggis -                      Section      2A       Ujung     amounting       to
       Cibitung Seksi 2 sebesar Rp1.511.406.501.311,                  Rp279,490,152,312, Ciawi - Sukabumi Toll Project
       Proyek Tol Jakarta - Cikampek II Elevated sebesar              Section 2 amounting to Rp1,758,862,573,023,
       Rp82.720.926.414, Proyek Tol Jakarta - Cikampek II             Cibitung - Cilincing Toll Road Project Section 1
       Sisi Selatan – Induk sebesar Rp1.801.679.984.829,              amounting to Rp349,622,715,534, Cibitung -
       Proyek Tol Jorr II Paket 1 Kunciran – Parigi sebesar           Cilincing Toll Road Section 2 amounting to
       Rp33.985.678.044, Proyek Tol Kuala Tanjung -                   Rp532,328,160,213, Cimanggis - Cibitung Toll
       Inderapura (Zona 2) sebesar Rp41.259.625.534,                  Project      Section      2     amounting       to
       Proyek Underpass MM2100 – Cibitung sebesar                     Rp1,511,406,501,311, Jakarta - Cikampek II Toll
       Rp3.135.000.001 (Catatan 31).                                  Road Project Elevated Rp82,720,926,414, Jakarta -
                                                                      Cikampek II Toll Road Project Sisi Selatan – Induk
                                                                      amounting to Rp1,801,679,984,829, Jorr II Package
                                                                      1 Toll Road Project Kunciran - Parigi amounting to
                                                                      Rp33,985,678,044, Kuala Tanjung - Inderapur Toll
                                                                      Project a (Zone 2) amounting to Rp41,259,625,534,
                                                                      MM2100 – Cibitung Underpass Project amounting to
                                                                      Rp3,135,000,001 (Note 31).

   •   PT Bank Pan Indonesia Tbk, piutang usaha                   •   PT Bank Pan Indonesia Tbk, accounts receivable
        yang dijaminkan terhadap proyek yaitu tagihan                 which are used as collateral consisting of terms of
       termin atas Proyek Pembangunan Jalan Tol Kayu                  bill from The Kayu Agung - Palembang - Betung
       Agung - Palembang - Betung Paket II seksi 2 sebesar            Toll Road Development Project Package II
       Rp1.646.239.879.277 dan Proyek Junction Tebing                 section 2 amounting to Rp1,646,239,879,277, and
       Tinggi sebesar Rp10.507.261.550 (Catatan 31).                  Tebing Tinggi Junction Project amounting to
                                                                      Rp10,507,261,550 (Note 31).

   •   PT Bank Pembangunan Daerah Jawa Barat dan                  •   PT Bank Pembangunan Daerah Jawa Barat dan
       Banten Tbk, piutang yang dijaminkan terhadap                   Banten Tbk, accounts receivable which are used
       Proyek yaitu tagihan termin atas Proyek Jalan                  as collateral consisting of terms of bill from Ciawi
       Tol Ciawi – Sukabumi Seksi 2 sebesar                           – Sukabumi Section 2 Project Toll Road
       Rp1.758.862.573.023 (Catatan 31).                              amounting to Rp1,758,862,573,023 (Note 31).

   •   PT Bank UOB Indonesia, piutang usaha yang                  •   PT Bank UOB Indonesia, accounts receivable
       dijaminkan terhadap proyek yaitu tagihan termin atas           which are used as collateral consisting of terms of
       Proyek Tol Kuala Tanjung - Inderapura (Zona 1)                 bill from Kuala Tanjung - Inderapura Toll Project
       sebesar Rp34.233.496.112, Proyek Tol Kuala                     (Zone 1) amounting to Rp34,233,496,112, Kuala
       Tanjung - Inderapura (Zona 2) sebesar                          Tanjung - Inderapura Toll Project (Zone 2)
       Rp41.259.625.534, Proyek TPA Sampah Regional                   amounting to Rp41,259,625,534, Manado
       Manado Minahasa sebesar Rp30.655.256.418                       Minahasa Regional Waste TPA Project
       (Catatan 31).                                                  amounting to Rp30,655,256,418 (Note 31).

   •   PT Bank BTPN Tbk, piutang usaha yang dijaminkan            •   PT Bank BTPN Tbk, accounts receivable which
       terhadap proyek yaitu tagihan termin atas Proyek               are used as collateral consisting of terms of bill
       Jembatan Jalan Tol Kapal Betung (Ogan) sebesar                 from Kapal Betung (Ogan) Toll Road Bridge
       Rp1.264.362.283.911 (Catatan 31).                              Project amounting to Rp1,264,362,283,911
                                                                      (Note 31).
   •   PT Bank Maybank Indonesia Tbk, piutang usaha               •   PT Bank Maybank Indonesia Tbk, accounts
       yang dijaminkan terhadap proyek yaitu tagihan termin           receivable which are used as collateral consisting


                                                          80
Page 84
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

       atas Proyek Bendungan Rukoh Paket II sebesar                    of terms of bill from Rukoh Dam Project Package
       Rp348.505.907.888 (Catatan 31).                                 II amounting to Rp348,505,907,888, (Note 31).

   •   Bank of China Ltd, piutang usaha yang                       •   Bank of China Ltd, accounts receivable which are
       dijaminkan terhadap proyek yaitu tagihan termin atas            used as collateral consisting of terms of bill from
       Proyek GI. PLTU Kaltim - GI. New Balikpapan 150KV               GI. PLTU East Kalimantan - GI. New Balikpapan
       sebesar Rp3.902.194.105, Proyek Terminal Bandara                150KV Project amounting to Rp3,902,194,105,
       Internasional        Minangkabau            sebesar             Internatiaonal Minangkabau Airport Terminal
       Rp129.069.031.660, Proyek Makassar Sewerage C2                  Project     amounting       toRp129,069,031,660,
       sebesar Rp9.455.543.781, Proyek Makassar                        Makassar Sewerage C2 Project amounting to
       Sewerage B2 sebesar Rp26.171.013.316 dan Proyek                 Rp9,455,543,781, Makassar Sewerage B2
       SUTT 150 KV Sangatta - Maloy seksi 2 sebesar                    Project amounting to Rp26,171,013,316, and 150
       Rp27.385.563.456 (Catatan 31).                                  KV Sangatta - Maloy section 2 SUTT Project
                                                                       amounting to Rp27,385,563,456, (Note 31).

   •   PT Bank BNP Paribas Indonesia, piutang usaha yang           •   PT Bank BNP Paribas Indonesia, accounts
       dijaminkan terhadap proyek yaitu tagihan termin atas            receivable which are used as collateral consisting
       Proyek Jalan Tol KAPB Paket IV Seksi 3B sebesar                 of terms of bill from KAPB Package IV Toll Road
       Rp76.609.516.590 dan Proyek Pembangunan Gardu                   Project     Section      3B    amounting        to
       Induk Tegangan Ekstra Tinggi 500 KV Peranap                     Rp76,609,516,590 and 500 KV Peranap (46%)
       (46%) sebesar Rp29.217.603.854 (Catatan 31).                    Extra High Voltage Substation Construction
                                                                       Project    amounting      to  Rp29,217,603,854
                                                                       (Note 31).

   •   Sindikasi PT Bank BTPN Tbk, Bank of China (Hong             •   Syndication of PT Bank BTPN Tbk, Bank of China
       Kong) Limited Jakarta Branch, PT Bank KEB Hana                  (Hong      Kong)    Limited     Jakarta   Branch,
       Indonesia, PT Bank Permata Tbk, PT Bank OCBC                    PT Bank KEB Hana Indonesia, PT Bank Permata
       NISP Tbk, PT Bank China Construction Bank                       Tbk, PT Bank OCBC NISP Tbk, PT Bank China
       Indonesia Tbk, PT Bank CTBC Indonesia,                          Construction Bank Indonesia Tbk, PT Bank CTBC
       PT Bank Shinhan Indonesia, PT Bank SBI Indonesia,               Indonesia, PT Bank Shinhan Indonesia, PT Bank
       piutang usaha yang dijaminkan terhadap proyek yaitu             SBI Indonesia, accounts receivable which are
       tagihan termin atas Proyek Jalan Tol Kayu Agung -               used as collateral consisting of terms of bill from
       Palembang - Betung II Seksi 1, Proyek Bendungan                 constuction contract of Kayu Agung - Palembang
       Temef NTT, Proyek Pembangunan Gedung Rektorat,                  - Betung II Toll Road Project Section 1, Temef
       Proyek Gedung Fakultas & Kawasan 3 Pilar Kampus                 NTT Dam Project, Construction of Rectorate
       Universitas Islam Internasional Indonesia (UIII) Paket          Building, Faculty & Area Building 3 Campus Pillars
       I dan Proyek Bendungan Marga Tiga sebesar total                 of Islam Internasional Indonesia University (UIII)
       Rp3.325.917.209.320 (Catatan 31).                               Package I and Marga Tiga Dam Project
                                                                       amounting to Rp3,325,917,209,320 (Note 31).

   •   Sindikasi PT Bank BTPN Tbk, PT Bank Permata Tbk,            •   Syndication of PT Bank BTPN Tbk, PT Bank
       PT Bank Resona Perdania, PT Bank Shinhan                        Permata Tbk, PT Bank Resona Perdania,
       Indonesia, PT Bank QNB Indonesia, piutang usaha                 PT Bank Shinhan Indonesia, PT Bank QNB
       yang dijaminkan terhadap proyek yaitu tagihan termin            Indonesia, accounts receivable which are used as
       atas Proyek Jln Tol Tebing Tinggi - Parapat tahap 1             collateral consisting of terms of bill from Tebing
       (Zona 1) sebesar Rp111.696.745.293, Proyek Jln Tol              Tinggi - Parapat Toll Road Project phase 1 (Zone
       Tebing Tinggi - Parapat tahap 1 (Zona 1A) sebesar               1) amounting to Rp111,696,745,293, Tebing
       Rp146.719.896.908, Proyek Jln Tol Tebing Tinggi -               Tinggi - Parapat Toll Road Project phase 1 (Zone
       Parapat     tahap     1    (Zona     2)     sebesar             1A) amounting to Rp146,719,896,908, Tebing
       Rp112.762.274.961, Proyek Jln Tol Tebing Tinggi -               Tinggi - Parapat Toll Road Project phase 1 (Zone
       Parapat     tahap     1    (Zona     3)     sebesar             2) ) amounting to Rp112,762,274,961, Tebing
       Rp147.723.739.892, Proyek Jln Tol Tebing Tinggi -               Tinggi - Parapat Toll Road Project phase 1 (Zone
       Parapat     tahap     1    (Zona     4)     sebesar             3) amounting to Rp147,723,739,892, Tebing
       Rp200.543.683.620 dan Proyek Nines Plaza dan                    Tinggi - Parapat Toll Road Project phase 1 (Zone
       Residence sebesar Rp337.942.464.435 (Catatan                    4) amounting to Rp200,543,683,620 and Nines
       31).                                                            Plaza and Residence Project amounting to
                                                                       Rp337,942,464,435 (Note 31).




                                                          81
Page 85
                                                                                              The original consolidated financial statements included herein are in
                                                                                                                                         the Indonesian language.


 PT WASKITA KARYA (PERSERO) TBK                                                                  PT WASKITA KARYA (PERSERO) TBK
 DAN ENTITAS ANAK                                                                                            AND ITS SUBSIDIARIES
 CATATAN ATAS LAPORAN KEUANGAN                                                              NOTES TO THE INTERIM CONSOLIDATED
 KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                                        FINANCIAL STATEMENTS AS OF JUNE 30, 2023
 31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                               AND DECEMBER 31, 2022 AND FOR THE SIX
 ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                                      MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
 (2022 – DIAUDIT) – Lanjutan                                                                          (2022 – AUDITED) – Continued
 (Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                                 (Expressed in full Rupiah amount, unless otherwise stated)

6. PIUTANG VENTURA BERSAMA                                                             6.      JOINT VENTURES RECEIVABLES

                                                                                                                         30 Juni/              31 Desember/
                      Kemitraan/                                        Nama Proyek/                                  June 30, 2023          December 31, 2022
                       Venturer                                         Project Name                                       Rp                       Rp


    Waskita - Arkitek Team Empat                Revitalisasi Pusat Olahraga Ragunan                                        83.178.377.013           82.058.061.313
    Waskita - Baswara Sinar Mulia               Jalan SP.Blusuh - BTS Kalteng                                              24.508.994.780           15.897.239.049
    KSO/JO Waskita - WIKA                       Jalan Tol Seksi-1 Ciawi - Cigombong/Lido (Paket 1)                         17.559.988.285           27.404.329.772
    Lain-lain/ Others
     (di bawah/ below Rp 20 Milyar/ Billion )                                                                            113.363.266.942           123.118.351.541
    Jumlah/Total                                                                                                         238.610.627.020           248.477.981.675


  Piutang ventura bersama merupakan pinjaman dan biaya                                      Joint venture receivables represent loan and advance
  ventura bersama yang dibayarkan terlebih dahulu oleh                                      payment of joint venture’s expenses paid by
  Grup.                                                                                     the Group.

  Piutang ventura bersama tidak dikenakan bunga. Piutang                                    Joint venture receivables were not subjected to
  ini tidak memiliki jaminan dan akan dilunasi pada saat                                    interest. These accounts have no collateral and are
  diminta.                                                                                  repayable on demand.

  Manajemen berpendapat bahwa piutang ventura                                               Management believes that balances of joint venture
  bersama dapat ditagihkan. Tidak memerlukan cadangan                                       receivables are collectible. No allowance for
  penurunan nilai, sebab manajemen berpendapat bahwa                                        impairment loss was provided as management
  piutang ventura bersama dapat ditagihkan.                                                 believes that balances of joint venture receivables are
                                                                                            collectible.

7. PIUTANG RETENSI – BERSIH                                                         7.       RETENTION RECEIVABLES – NET

                                                                30 Juni/                31 Desember/
                                                             June 30, 2023            December 31, 2022
                                                                  Rp                         Rp
    Pihak Berelasi                                            1.864.944.617.158             1.836.182.668.107                                        Related Parties
    Dikurangi: Aset Keuangan                                                                                                                   Less: Financial Asset
     Saling Hapus                                              (579.032.019.184)             (579.032.019.184)                                               Offset
    Sub Jumlah                                                1.285.912.597.974             1.257.150.648.923                                             Sub Total
    Pihak Ketiga                                                249.699.023.954              206.601.822.823                                           Third Parties
    Sub Jumlah                                                  249.699.023.954              206.601.822.823                                              Sub Total
    Jumlah                                                    1.535.611.621.928             1.463.752.471.746                                                 Total


  Rincian saldo piutang retensi adalah sebagai berikut:                                     The details of retention receivables are as follows:

                                                                                                                    30 Juni/                  31 Desember/
                                                                                                                 June 30, 2023              December 31, 2022
                                                                                                                      Rp                           Rp
    Pihak Berelasi/ Related Parties
     PT Hutama Karya (Persero)                                                                                      665.334.767.252              665.334.767.252
     PT Cibitung Tanjung Priok Port Tollways                                                                        413.931.960.528              397.152.055.072
     PT Jasamarga Japek Selatan                                                                                     296.565.268.819              267.774.895.299
     PT Cimanggis Cibitung Tollways                                                                                 169.061.726.407              156.333.464.800
     PT Jasamarga Jalan Layang Cikampek                                                                             115.772.753.279              155.946.375.632
     PT Kresna Kusuma Dyandra Marga                                                                                 104.764.824.782              104.764.824.782
     PT Jasamarga Solo Ngawi                                                                                         83.509.371.758               83.509.371.758
     PT Marga Trans Nusantara                                                                                        33.985.678.043               33.985.678.043
     PT Angkasa Pura II (Persero)                                                                                    23.055.357.030               22.397.388.278
     Lain-lain/ Others (di bawah/ below Rp 20 Milyar/ Billion )                                                      51.419.211.212               56.046.987.612
     Dikurangi: Penyisihan Kerugian Ekspektasian Penurunan Nilai Piutang Retensi/
      Less: Allowance For Impairment Expected Credit of Retention Receivables                                       (92.456.301.952)           (107.063.140.421)
    Sub Jumlah/ Sub Total                                                                                         1.864.944.617.158            1.836.182.668.107




                                                                             82
Page 86
                                                                                     The original consolidated financial statements included herein are in
                                                                                                                                the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                               PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                                         AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                           NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                                     FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                            AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                                   MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                                       (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                           (Expressed in full Rupiah amount, unless otherwise stated)

                                                                                                           30 Juni/                 31 Desember/
                                                                                                        June 30, 2023             December 31, 2022
                                                                                                             Rp                          Rp
 Pihak Ketiga/ Third Parties
  Kementerian Pekerjaan Umum dan Perumahan Rakyat/
   The Ministry of Public Works and Housing                                                               142.852.671.166              109.026.893.703
  Kementerian Pekerjaan Umum Republik
  Demokrasi Timor Leste/ Ministry of Public Works
   of the Democratic Republic of Timor Leste                                                               62.532.406.615               62.532.406.615
  Crown Prince Court                                                                                       29.723.105.829               29.723.105.829
  Bin Ladin Contractor Group LLC                                                                           27.707.741.349               27.707.741.349
  Pemerintah Daerah/ District Governments                                                                  23.756.393.105               30.713.381.459
  PT Pardika Wisthi Sarana                                                                                 23.431.420.350               23.431.420.350
  Kementerian Transportasi dan Komunikasi Republik
  Demokrasi Timor Leste/ Ministry of Transport and Communication
   of the Democratic Republic of Timor Leste                                                               22.962.827.497               22.962.827.497
  Lain-lain/ Others (di bawah/ below Rp 20 Milyar/ Billion )                                              138.358.860.613              122.706.092.247
  Dikurangi: Penyisihan Kerugian Ekspektasian Penurunan Nilai Piutang Retensi/
   Less: Allowance For Impairment Expected Credit of Retention Receivables                              (221.626.402.570)            (222.202.046.226)
 Sub Jumlah/ Sub Total                                                                                    249.699.023.954              206.601.822.823
 Jumlah/ Total                                                                                          2.114.643.641.112            2.042.784.490.930


 Mutasi cadangan kerugian penurunan nilai piutang                                  The movements in allowance for impairment losses on
 retensi adalah sebagai berikut:                                                   retention receivables are as follows:

                                                           30 Juni/                 31 Desember/
                                                        June 30, 2023             December 31, 2022
                                                             Rp                          Rp

   Saldo Awal                                             (329.265.186.647)           (259.471.125.495)                              Beginning Balance
   Penambahan PSAK 71 Tahun Berjalan                       (10.041.263.487)           (190.288.422.071)             Addition of PSAK 71 for Current Year
   Pemulihan PSAK 71 Tahun Berjalan                          25.223.745.612             120.494.360.919            Recovery of PSAK 71 for Current Year
   Saldo Akhir                                            (314.082.704.522)           (329.265.186.647)                                  Ending Balance


 Pada tanggal 30 Juni 2023, terdapat penambahan                                    As of June 30, 2023, the additional allowance for
 cadangan kerugian penurunan nilai piutang retensi yang                            impairment losses on retention receivables came from
 berasal dari penambahan PSAK 71 tahun berjalan                                    addition PSAK 71 for current year amounting to
 sebesar Rp10.041.263.487 dan terdapat pemulihan                                   Rp10,041,263,487, and recovery PSAK 71 for current
 PSAK 71 tahun berjalan sebesar Rp25.223.745.612                                   year amounting to Rp25,223,745,612, (Note 43).
 (Catatan 43).

 Pada tanggal 31 Desember 2022, terdapat penambahan                                As of December 31, 2022, the additional allowance for
 cadangan kerugian penurunan nilai piutang retensi yang                            impairment losses on retention receivables came from
 berasal dari penambahan PSAK 71 tahun berjalan                                    addition PSAK 71 for current year amounting to
 sebesar Rp190.288.422.069 dan terdapat pemulihan                                  Rp190,288,422,069 and recovery PSAK 71 for current
 PSAK 71 tahun berjalan sebesar Rp120.494.360.919                                  year amounting to Rp120,494,360,919 (Note 43).
 (Catatan 43).

 Manajemen berpendapat bahwa cadangan kerugian                                     The management believes that allowance for
 penurunan nilai piutang retensi adalah cukup untuk                                impairment losses on retention receivables is sufficient
 menutupi kemungkinan tidak tertagihnya piutang retensi                            to cover the possible losses on the uncollectible
 di kemudian hari. Manajemen juga berpendapat bahwa                                retention receivables in the future. The management
 tidak terdapat risiko yang terkonsentrasi secara                                  also believes that there is no significant concentration
 signifikan atas piutang retensi pada satu pelanggan.                              of credit risk on retention receivables from one single
                                                                                   customer.




                                                                        83
Page 87
                                                                                        The original consolidated financial statements included herein are in
                                                                                                                                   the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                            (Expressed in full Rupiah amount, unless otherwise stated)

8. PIUTANG LAIN-LAIN – BERSIH                                                   8. OTHER RECEIVABLES – NET

  a. Piutang Lain-lain Lancar – Bersih                                                  a. Other Current Receivables – Net

                                                                                                                30 Juni/                31 Desember/
                                                                                                             June 30, 2023            December 31, 2022
                                                                                                                  Rp                         Rp

      Pihak Berelasi/ Related Parties
       KSO/JO WKR - Darmo Permai                                                                                322.432.921.888             317.004.170.877
       KSO/JO WKR - Asiana Senopati                                                                             300.677.369.863             300.677.369.863
       PT Hutama Karya (Persero)                                                                                 58.309.004.704              62.783.380.704
       PT Asuransi Jiwasraya (Persero)                                                                           38.419.167.364              37.128.905.341
       KSO/JO Waskita - Vision First                                                                             35.388.726.126               1.707.762.198
       PT Jasamarga Solo Ngawi                                                                                   23.358.564.278              23.448.088.604
       PT Prima Multi Terminal                                                                                    9.332.050.441               9.332.050.441
       PT Cimanggis Cibitung Tollways                                                                             1.090.311.143           3.749.163.273.250
       PT Kresna Kusuma Dyandra Marga                                                                               493.743.494           2.141.387.858.462
       PT Perusahaan Listrik Negara (Persero)                                                                                 --            184.168.799.025
       Lain-lain/ Others (dibawah/ below Rp 20 Milyar/ Billion )                                                 61.719.121.205              87.524.840.683
       Dikurangi: Penyisihan Kerugian Ekspektasian Penurunan Nilai Piutang Lain-lain/
        Less: Allowance For Expected Credit of Other Receivables                                               (18.706.492.479)            (63.126.349.877)
      Sub Jumlah/ Sub Total                                                                                     832.514.488.027           6.851.200.149.571
      Pihak Ketiga/ Third Parties
       Kementerian Pekerjaan Umum dan Perumahan Rakyat                                                         299.400.089.732             205.273.528.886
       Lembaga Manajemen Aset Negara                                                                            140.405.496.006             137.478.396.006
       PT Yasa Patria Perkasa                                                                                    59.579.039.079             151.699.370.469
       Lain-lain/ Others (dibawah/ below Rp 20 Milyar/ Billion )                                                  4.344.672.178               4.336.904.698
       Dikurangi: Penyisihan Kerugian Ekspektasian Penurunan Nilai Piutang Lain-lain/
        Less: Allowance For Expected Credit of Other Receivables                                              (183.337.448.156)           (183.337.448.155)
      Sub Jumlah/ Sub Total                                                                                     320.391.848.839             315.450.751.904
      Jumlah/ Total                                                                                           1.152.906.336.866           7.166.650.901.475


     Piutang lain-lain merupakan biaya yang dibayar terlebih                                Other current receivables consist of expenses paid
     dahulu oleh Grup untuk pembebasan lahan.                                               in advance by the Group for land acquisition.

     KSO WKR – Darmo Permai                                                                 KSO WKR – Darmo Permai

     Piutang KSO WKR - Darmo Permai ini merupakan                                           The receivable from KSO WKR - Darmo Permai
     piutang terhadap KSO WKR - Darmo Permai sebesar                                        amounting to Rp172,500,000,000 is based on
     Rp172.500.000.000 berdasarkan perjanjian No. 003/P.                                    agreement No. 003/P.WKR/2017, where in the
     WKR/2017, Perusahaan juga mempunyai hak                                                Company has right to reimburs ofVAT for
     pengembalian uang atas penyetoran PPN Masukan                                          acquisition of land by the Company behalf of
     pada saat akuisisi tanah perusahaan ke KSO sebesar                                     the joint venture amounting to Rp21,731,737,500,
     Rp21.731.737.500 dan penggantian biaya operasional                                     and reimbursement of operational expense of
     KSO WKR – Darmo permai sebesar Rp66.061.481.668.                                       KSO WKR - Darmo Permai amounting to
                                                                                            Rp66,061,481,668.

     KSO WKR – Asiana Senopati                                                              KSO WKR – Asiana Senopati

     Pada tanggal 11 April 2019, Perusahaan membuat                                         On April 11, 2019, the Company entered into final
     perjanjian pengakhiran kerja sama operasi dengan                                       joint operation agreement with PT Asiana
     PT Asiana Senopati atas Proyek KSO WKR-Asiana                                          Senopati regarding project KSO WKR-Asiana
     Senopati dengan Akta Notaris oleh Ariani L. Rachim No.                                 Senopati based on Notarial Deed No. 002 of Ariani
     002 tanggal 12 Desember 2019 dan menyetujui hak dan                                    L. Rachim dated December 12, 2019 where in
     kewajibannya untuk mengembalikan investasinya                                          both parties agreed to return each of their
     masing-masing dan PT Asiana Senopati mengakui                                          investment to PT Asiana Senopati to disclaim its
     utang atas pengembalian investasi WKR.                                                 obligation to WKR.

     PT Perusahaan Listrik Negara (Persero)                                                 PT Perusahaan Listrik Negara (Persero)

     Piutang lain-lain kepada PT Perusahaan Listrik Negara                                  Other receivables from PT Perusahaan Listrik
     (Persero) merupakan piutang atas bunga ekuitas yang                                    Negara (Persero) represent receivables on equity
     dibebankan kepada PT Perusahaan Listrik Negara                                         interest charged to PT Perusahaan Listrik Negara
     (Persero)     akibat   penggunaan    dana      ekuitas                                 (Persero) due to the use of equity funds as stated
     sebagaimana tertuang dalam Perjanjian Penggunaan                                       in the Agreement on Use and Refund of Equity

                                                                        84
Page 88
                                                                  The original consolidated financial statements included herein are in
                                                                                                             the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                             PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                       AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                         NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                   FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                          AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                 MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                     (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)         (Expressed in full Rupiah amount, unless otherwise stated)

     dan Pengembalian Dana Ekuitas untuk Pekerjaan                    Funds for Work Package 1: 500 Kv Sumatera
     Paket 1: Pengadaan Transmisi 500 Kv Sumatera, New                Transmission Procurement, New Aur Duri -
     Aur Duri – Peranap No. 19.3/P/WK/2016 tanggal                    Peranap No. 19.3/P/WK/2016 dated May 23, 2016
     23 Mei 2016 dan Perjanjian Penggunaan dan                        and Agreement on the Use and Refund of Equity
     Pengembalian Dana Ekuitas untuk Pekerjaan Paket 2:               Funds for Work Package 2: 500 Kv Sumatera
     Pengadaan Transmisi 500 Kv Sumatera, Peranap –                   Transmission Procurement, Peranap - Perawang
     Perawang No. L.19.4/P/WK/2016 tanggal 23 Mei 2016.               No. L.19.4/P/WK/2016 dated May 23, 2016.

     PT Hutama Karya (Persero)                                        PT Hutama Karya (Persero)

     Piutang kepada PT Hutama Karya (Persero) digunakan               Other receivables from PT Hutama Karya
     untuk memberikan dana talangan tanah ruas Jalan Tol              (Persero) were used to provide land bailouts for
     Ruas Terbanggi Besar – Pematang Panggang –                       the Terbanggi Besar - Pematang Panggang -
     Kayuagung sesuai dengan Perjanjian Fasilitas                     Kayuagung Toll Road section in accordance with
     Pinjaman No. DU/TAW.1614/S.Perj.29/2017 tanggal 19               the Loan Facility Agreement No. DU/TAW.1614/
     Juni 2017.                                                       S.Perj.29/2017 dated June 19, 2017.

     Lembaga Manajemen Aset Negara                                    Lembaga Manajemen Aset Negara

     Piutang lain-lain kepada Lembaga Manajemen Aset                  Other current receivables from                      Lembaga
     Negara merupakan:                                                Manajemen Aset Negara represent:

     1. Piutang atas Dana Dukungan          Pemerintah                1. Receivables of Government Support Fund
        berdasarkan    Amendemen       VII    Perjanjian                 based on Amendment VII Concession
        Pengusahaan Jalan Tol Ruas Jalan Cimanggis –                     Agreement Cimanggis-Cibitung Toll Road
        Cibitung sesuai akta notaris No. 3 tanggal                       according to notarial deed No. 3 dated
        10 Februari 2020 dibuat dihadapan Notaris Rina                   February 10, 2020 by Rina Utami Djauhari,
        Utami Djauhari, S.H., dengan jumlah dana                         S.H., with the total maximum amount of
        pengadaan tanah yang harus disediakan adalah                     land    funds   to    be   provided   is
        maksimum sebesar Rp6,696.410.547.856.                            Rp6,696,410,547,856.

     2. Piutang atas Dana Dukungan Pemerintah                         2. Receivables of Government Support Fund
        berdasarkan     Amendemen      VI     Perjanjian                 based on Amandment VI Concession
        Pengusahaan Jalan Tol Ruas Jalan Cibitung –                      Agreement Cibitung-Cilincing Toll Road
        Cilincing sesuai akta notaris No. 17 tanggal                     according to notarial deed No. 17 dated May
        31 Mei 2018 dibuat dihadapan Notaris Rina Utami                  31, 2018 of notary Rina Utami Djauhari, S.H.,
        Djauhari, S.H., dengan jumlah dana pengadaan                     with the total maximum amount of land funds
        tanah yang harus disediakan adalah maksimum                      to be provided is Rp4,028,212,083,253.
        sebesar Rp4.028.212.083.253.

     3. Piutang atas Dana Dukungan Pemerintah                         3. Receivables of Government Support Fund
        berdasarkan Amendemen I Perjanjian Pengusahaan                   based on Amandment I Concession
        Jalan Tol Ruas Jalan Krian-Legundi-Bunder-Manyar                 Agreement      Krian-Legundi-Bunder-Manyar
        sesuai akta notaris No. 3 tanggal 15 Desember 2017               Toll Road according to notarial deed
        dibuat dihadapan Notaris Rina Utami Djauhari, S.H.,              No. 3 dated December 15, 2017 of notary Rina
        dengan jumlah dana pengadaan tanah yang                          Utami Djauhari, S.H., with the total maximum
        harus disediakan adalah maksimum sebesar                         amount of land funds to be provided is
        Rp1.700.000.000.000.                                             Rp1,700,000,000,000.

     4. Piutang     atas    dana     dukungan   Pemerintah            4. Receivables of Government support fund
        berdasarkan Perjanjian Pengusahaan Jalan Tol Ruas                based on Concession Agreement Bekasi –
        Jalan Bekasi -Cawang – Kampung Melayu sesuai                     Cawang – Kampung Melayu Toll Road
        akta notaris No. 09 tanggal 16 Desember 2011 dibuat              according to notarial deed No. 09 dated
        dihadapan Notaris Rina Utami Djauhari, S.H.                      December 16, 2011 of notary Rina Utami
                                                                         Djauhari, S.H.

     5. Piutang atas Dana Dukungan Pemerintah                         5. Receivables of Government Support Fund
        berdasarkan perjanjian Pengusahaan Jalan Tol Ruas                based on Concession Agreement Pemalang -
        Jalan Pemalang – Batang sesuai akta notaris No. 6                Batang Toll Road according to notarial deed
        tanggal 31 Agustus 2018 dibuat dihadapan Notaris                 No. 6 dated August 31, 2018 of notary Rina
        Rina Utami Djauhari, S.H., dengan jumlah dana                    Utami Djauhari, S.H., with the total amount of
        pengadaan tanah yang harus disediakan adalah                     land funds to be provided maximum is
        maksimum sebesar Rp1.400.000.000.000.                            Rp1,400,000,000,000.


                                                          85
Page 89
                                                                                 The original consolidated financial statements included herein are in
                                                                                                                            the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                            PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                                      AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                                  FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                         AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                                MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                                    (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                        (Expressed in full Rupiah amount, unless otherwise stated)

     6. Piutang atas Dana Dukungan Pemerintah                                        6. Receivables of Government Support Fund
        berdasarkan Amendemen V Perjanjian Pengusahaan                                  based on Amandment V Concession
        Jalan Tol Ruas Jalan Ciawi – Sukabumi sesuai akta                               Agreement Ciawi - Sukabumi Toll Road
        notaris No. 18 tanggal 31 Mei 2018 dibuat dihadapan                             according tonotarial deed No. 18 dated May
        Notaris Rina Utami Djauhari, S.H.                                               31, 2018 of notary Rina Utami Djauhari, S.H.

     Piutang lain-lain ini dikenakan bunga berdasarkan BI 7                          These other receivable bear interest based on BI
     days Repo Rate pada tanggal dimulainya perhitungan                              7 days Repo Rate on the start date of
     biaya dana.                                                                     the calculation of the cost of funds.

     Piutang Lembaga Manajemen Aset Negara sebesar                                   Receivable from Lembaga Manajemen Aset
     Rp266.114.970.050 adalah piutang TJPJT untuk                                    Negara amounting to Rp266,114,970,050 is a
     Dana Talangan Tanah sampai dengan nilai                                         loan from TJPJT for a Land Transfer Fund up to
     Rp2.129.911.539.815 sesuai dengan Amendemen VIII                                Rp2,129,911,539,815 in accordance with
     Perjanjian Pengusahaan Jalan Tol No. 8 tanggal                                  the Amendment VIII of Toll Road Concession
     18    Februari    2020.   Berdasarkan     Perjanjian                            Agreement No. 8 dated February 18, 2020. Based
     Pengusahaan Jalan Tol Amendemen IX tanggal                                      on result of Toll Road Concession Agreement No.
     18 Juni 2021, menyatakan bahwa Pemerintah akan                                  IX dated June 18, 2021, the Government will
     memastikan bahwa pembayaran kembali jumlah Dana                                 ensure the repayment of the principal amount of
     Pengadaan Tanah oleh Badan Usaha Jalan Tol                                      the Land Acquisition Fund by the Badan Usaha
     (“BUJT”) yang telah terpakai dilaksanakan oleh                                  Jalan Tol ("BUJT") that has been used by
     Lembaga Manajemen Aset Negara (“LMAN”). Grup                                    Lembaga Manajemen Aset Negara (“LMAN”).
     membiayai terlebih dahulu kenaikan harga tanah dan                              The Group paid in advance the appreciation price
     selanjutnya akan mengajukan permohonan dana                                     of land and subsequently will be reimbursed by the
     kepada Pemerintah.                                                              Government.

     PT Yasa Patria Perkasa                                                          PT Yasa Patria Perkasa

     Berdasarkan perjanjian No. 06/Kontrak-S1-C/2015                                 Based on Agreement No. 06/Kontrak-S1-C/2015
     tanggal 23 November 2015, yang telah diubah dengan                              dated November 23, 2015, which was amended
     kontrak No. 023/ADD/KONTRAK-S1-C/2016 tanggal                                   by contract No. 023/ADD/ KONTRAK-S1-C/2016
     1    September   2016,     Perusahaan     menunjuk                              dated September 1, 2016, the Company
     PT Yasa Patria Perkasa sebagai kontraktor untuk                                 appointed PT Yasa Patria Perkasa as
     melaksanakan pekerjaan struktur tanah Seksi 1-C: Sta                            the contractor for land structure work of Section 1-
     9+000 - Sta 13+400 ruas jalan tol Kayuagung-                                    C: Sta 9+000 – Sta 13+400 of Kayuagung-
     Palembang-Betung dengan dengan nilai kontrak                                    Palembang-Betung toll road with contract value
     sebesar Rp398.521.411.000 (termasuk PPN).                                       amounting            to         Rp398,521,411,000
                                                                                     (including VAT).

     Berdasarkan perjanjian No.01/KONTRAK.S1-A.B.C-                                  Based on Agreement No. 01/KONTRAK.S1
     YPP/2016 tanggal 24 Februari 2016, Perusahaan                                   A.B.C-YPP/2016 dated February 24, 2016,
     menunjuk PT Yasa Patria Perkasa sebagai kontraktor                              the Company appointed PT Yasa Patria Perkasa
     untuk melaksanakan pekerjaan struktur tanah Seksi                               the contractor for land structure work of section 1-
     1-A.B.C: Sta 00+000-Sta 13+400 ruas jalan tol                                   A.B.C: Sta 00+000-Sta 13+400 of Kayuagung-
     Kayuagung- Palembang-Betung dengan dengan nilai                                 Palembang-Betung toll road with contract value
     kontrak sebesar Rp554.410.156.000 (termasuk PPN).                               amounting            to         Rp554,410,156,000
                                                                                     (including VAT).

 b. Piutang Lain-lain Tidak Lancar - Bersih                                      b. Other Non-Current Receivables - Net

                                                                                                        30 Juni/                 31 Desember/
                                                                                                     June 30, 2023             December 31, 2022
                                                                                                          Rp                          Rp

     Pihak Berelasi/ Related Parties
      PT Kresna Kusuma Dyandra Marga                                                                  3.945.976.647.652                            --
      PT Cimanggis Cibitung Tollways                                                                  2.349.820.978.805                            --
      Indonesia Investment Authority (INA)                                                            2.004.379.730.079            1.951.418.786.970
      PT Istaka Karya (Persero)                                                                          74.914.307.748               74.914.307.748
      Lain-lain/ Others (dibawah/ below Rp 20 Milyar/ Billion)                                           9.009.648.894                             --
     Dikurangi: Penyisihan Kerugian Penurunan Nilai Piutang Lain-lain/
        Less: Allowance for Losses of Other Receivables                                                (140.413.983.244)             (88.742.629.319)
     Jumlah/ Total                                                                                    8.243.687.329.934            1.937.590.465.399



                                                                         86
Page 90
                                                                  The original consolidated financial statements included herein are in
                                                                                                             the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                             PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                       AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                         NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                   FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                          AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                 MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                     (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)         (Expressed in full Rupiah amount, unless otherwise stated)

     PT Kresna Kusuma Dyandra Marga (KKDM)                            PT Kresna Kusuma Dyandra Marga (KKDM)

     Piutang lain-lain kepada PT KKDM digunakan untuk                 Other receivable from PT KKDM was used for
     kebutuhan investasi dan operasional. Pada tanggal 29             the purpose of investment and operations.
     Desember 2022, WTR dan PT. KKDM menandatangani                   On December 29, 2022, WTR and PT. KKDM
     Perjanjian Fasilitas Pinjaman Pemegang Saham No.                 entered into Shareholder Loan Facility Agreement
     ADD/17.14/WTR/1222 dengan tingkat suku bunga                     No. ADD/17.14/WTR/1222 with interest rates
     sebesar 12-12,65% per tahun, dan akan jatuh tempo                12-12.65% per annum and will be due
     pada tanggal 30 Desember 2023.                                   on December 30, 2023.

     Perjanjian fasilitas pinjaman pemegang saham                     Shareholder loan facility agreement for investing
     untuk kebutuhan        investasi  telah mengalami                has been amended, most recently by addendum
     perubahan     terakhir     berdasarkan    addendum               No. ADD/08.23/WTR/0523. The working capital
     No.    ADD/08.22/WTR/0523.       Pinjaman   tersebut             loans bear an interest at 8.5% per annum, with
     dikenakan bunga 8,5% per tahun, yang jatuh tempo                 maturity date on May 3, 2028.
     pada tanggal 3 Mei 2028.

     PT Cimanggis Cibitung Tollways (CCT)                             PT Cimanggis Cibitung Tollways (CCT)

     Berdasarkan Perjanjian Fasilitas Pinjaman Pemegang               Based on Shareholder Loan Facility Agreement
     Saham No. 6/FPPS/WTR/2016 tanggal 24 Mei 2016,                   No. 6/FPPS/WTR/2016 dated May 24, 2016, the
     Group memberikan pinjaman kepada CCT dengan nilai                Group provided a loan to CCT amounting to
     sebesar Rp1.036.287.057.882. Pinjaman ini digunakan              Rp1,036,287,057,882. The purpose of the loan
     untuk pembebasan tanah. Pinjaman ini berjangka                   facility is for land acquisition. This credit facility is
     waktu 6 bulan sejak tanggal pencairan pinjaman dan               repayable in 6 months from the date of drawdrown
     dikenakan bunga 9,5% per tahun dengan metode                     and bears interest of 9.5% per annum on a
     perhitungan compound interest. Pada 27 Desember                  compounding interest method. On December 27,
     2017, Perusahaan dan WTR setuju untuk melakukan                  2017, the Company and WTR agreed to extend
     perpanjangan      atas       perjanjian      pinjaman            the       loan      agreement        amounting         to
     sebesar    Rp4.530.551.044.573        melalui     Akta           Rp4,530,551,044,573              through          Deed
     No. 33/ADD/FPPS/WTR/2017 dengan bunga yang                       No. 33/ADD/FPPS/WTR/2017 bearing interest of
     dikenakan sebesar Lembaga Penjamin Simpanan                      Lembaga Penjamin Simpanan (LPS) + 1% per
     (LPS) + 1% per tahun. Sesuai adendum                             annum.        According      to    the    amendment
     No. ADD/21.5/WTR/1221 tanggal 29 Desember 2021,                  No. ADD/21.5/WTR/1221 dated December 29,
     masa berlaku perjanjian diperpanjang sampai dengan               2021, the term of this agreement is valid until
     31 Desember 2022.                                                December 31, 2022.

     Berdasarkan Fasilitas Pinjaman Pemegang Saham                    Based on Shareholder Loan Facility Agreement
     No. 2/FPPS/WTR/2015 tanggal 11 Juli 2015, Grup                   No. 2/FPPS/WTR/2015 dated July 11, 2015,
     memberikan pinjaman dengan nilai sebesar                         The Group provided a loan to CCT amounting to
     Rp1.043.842.500. Pinjaman ini digunakan untuk                    Rp1,043,842,500. The purpose of the loan facility
     operasional.                                                     is for CCT’s operations.

     Sesuai adendum No. ADD/20.1/ WTR/1222 tanggal 29                 According to amendment No. ADD/20.1/
     Desember 2022, jangka waktu pinjaman ini berlaku                 WTR/1222 dated December 29, 2022, the term of
     sampai dengan tanggal 30 Desember 2023 dan                       this agreement is valid until December 30, 2023,
     dikenakan bunga 8,50% per tahun.                                 and bearing interest of 8.50% per annum.

     Perjanjian fasilitas pinjaman pemegang saham                     Shareholder loan facility agreement for investing
     untuk kebutuhan         investasi  telah mengalami               has been amended, most recently by addendum
     perubahan      terakhir     berdasarkan    addendum              No. ADD/08.30/WTR/0523. The working capital
     No.    ADD/08.30/WTR/0523.        Pinjaman   tersebut            loans bear an interest at 9% per annum, with
     dikenakan bunga 9% per tahun, yang jatuh tempo pada              maturity date on May 3, 2028.
     tanggal 3 Mei 2028.




                                                          87
Page 91
                                                                  The original consolidated financial statements included herein are in
                                                                                                             the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                             PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                       AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                         NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                   FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                          AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                 MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                     (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)         (Expressed in full Rupiah amount, unless otherwise stated)

     PT Istaka Karya (Persero)                                        PT Istaka Karya (Persero)

     Piutang lain-lain PT Istaka Karya (Persero) sebesar              Other receivables from PT Istaka Karya (Persero)
     Rp64.169.976.914 merupakan piutang Perusahaan                    amounting to Rp64,169,976,914 were receivables
     yang diberikan berdasarkan keputusan para                        given in accordance with the Decision of the
     Pemegang Saham Perusahaan di luar RUPS No. KEP-                  Shareholders of the Company outside of the GMS
     83/MBU/2011 dan No. KEP-PS04/PPA/0411 tanggal 1                  No.    KEP-83/MBU/2011       and    No.    KEP-
     April 2011. Pada tanggal 21 Mei 2011, Perusahaan                 PS04/PPA/0411 dated April 1, 2011. On May 21,
     menerima          Surat       Pengakuan       Utang              2011, the Company received a Letter of Debt
     No. L.05B/P/WK/2011      dan    No. DU-SP/2011.01B               Acknowledgement No. L.05B/P/ WK/2011 and No.
     dari    PT    Istaka    Karya    (Persero)  sebesar              DU-SP/2011.01B from PT Istaka Karya (Persero)
     Rp64.169.976.914.                                                amounting to Rp64,169,976,914.

     Pada tanggal 12 April 2011, PT Istaka Karya (Persero)            On April 12, 2011, PT Istaka Karya (Persero)
     memohon kepada Perusahaan sesuai surat                           requested to the Company through letter
     No. DK/2011-323 untuk menerbitkan garansi bank                   No. DK/2011-323 to issue a bank guarantee for
     proyek   Bandar       Lampung      bypass    sebesar             Bandar Lampung bypass project amounting to
     Rp10.661.885.000 dan biaya provisi untuk penerbitan              Rp10,661,885,000 and the cost of provision for
     garansi bank sebesar Rp312.445.834. Pada                         bank guarantee issuance amounting to
     tanggal    30    Maret      2012,    bank     garansi            Rp312,445,834. On March 30, 2012, the bank
     No. 2011/JPU/GB/068/6148/Monday telah dicairkan                  guarantee No. 2011/JPU/GB/068/6148/Monday
     oleh pemilik proyek, sehingga piutang Perusahaan                 has been executed by the owner of the project, so
     kepada PT Istaka Karya (Persero) menjadi sebesar                 that the receivables of the Company from
     Rp75.144.307.748.                                                PT Istaka Karya (Persero) amounting to
                                                                      Rp75,144,307,748.

     Ketidakmampuan PT Istaka Karya (Persero) dalam                   Inability of PT Istaka Karya (Persero) in fulfilling
     memenuhi pembayaran utangnya menyebabkan                         its debt payments, caused the settlement of debt
     penyelesaian utang dilakukan dengan cara Debt to                 using Debt to Equity Swap to solve its debt, which
     Equity Swap, yaitu para kreditur mendapatkan posisi              means the creditors get a position as an equity
     sebagai pemegang ekuitas PT Istaka Karya (Persero)               holder of PT Istaka Karya (Persero) in line of
     sebagai pengganti pembayaran atas utang PT Istaka                payment for a debt of PT Istaka Karya (Persero)
     Karya (Persero) kepada para kreditur. Pembayaran                 to the creditors. The payment of receivables will
     piutang akan dilakukan secara bertahap ditahun ke 9              be settled partially on the 9th year for a maximum
     sampai maksimal 5 tahun.                                         of 5 years.

     Berdasarkan surat dari Perusahaan No. 483/WK/                    According to the Company’s letters No. 483/WK/
     Dir/2013 tanggal 7 Mei 2013 tentang Pelaksanaan                  Dir/2013 dated May 7, 2013 thats concerning
     Putusan Pengesahan Perdamaian (Homologasi)                       the Execution of Decision to Ratification of Peace
     No. 23/PKPU/ 2012/PN.Niaga.JKT.PST. Perusahaan                   (Homologation)         No.         23/PKPU/2012/
     meminta PT Istaka Karya (Persero) untuk                          PN.Niaga.JKT.PST. The Company asked
     menyelesaikan utangnya dengan skema penyelesaian                 PT Istaka Karya (Persero) to resolve the debt with
     sebagai berikut:                                                 the following settlement scheme:

    1. Pembayaran awal senilai 3% atau sebesar                        1. The initial payment valued at 3% or amounting
       Rp2.549.586.465.                                                  to Rp2,549,586,465.
    2. Pemenuhan sisa pembayaran senilai 97% dari                     2. The fulfillment of the remaining payment
       jumlah utang dalam bentuk penyertaan saham                        valued at 97% from the total debt in the form
       sementara (Debt to Equity Swap) sebesar                           of temporary investments in share of stocks
       Rp82.436.629.045.                                                 (Debt to Equity Swap) for Rp82,436,629,045.

     Berdasarkan surat di atas, Perusahaan menerima                   Based on the above letters, the Company has
     jawaban PT Istaka Karya (Persero) dengan surat                   received the response from PT Istaka Karya
     No. DU/2013-131 tanggal 15 Mei 2013 yang berisi:                 (Persero) with the letter No. DU/2013-131 dated
                                                                      May 15, 2013 that contains:

    1. Pembayaran awal 3% bersumber dari pencairan                    1. The    initial  payment      of   3%     from
       piutang atas eskalasi proyek SKSD.                                the   disbursement    of     receivables    of
                                                                         the escalation SKSD project.



                                                          88
Page 92
                                                                         The original consolidated financial statements included herein are in
                                                                                                                    the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                    PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                              AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                          FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                 AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                        MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                            (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                (Expressed in full Rupiah amount, unless otherwise stated)

    2. Sisa pembayaran sebesar 97% dalam bentuk                              2. The remaining payment of 97% in the form of
       penyertaan saham, sedang dilakukan kajian oleh                           investments in share of stocks, is being
       Kementrian Keuangan dan instansi terkait.                                reviewed by the Ministry of Finance and
                                                                                related institutions.

     Sampai dengan tanggal pelaporan, PT Istaka Karya                        Until the date of the report, PT Istaka Karya
     (Persero) belum memenuhi sisa pembayaran senilai                        (Persero) has not fulfilled the remaining payment
     97% dari jumlah utang dalam bentuk penyertaan                           valued at 97% from the total debt in the form of
     saham sementara (Debt to Equity Swap) sehingga                          temporary investments in shares of stock (Debt to
     Perusahaan membukukan        cadangan kerugian                          Equity Swap) thus the Company provided
     penurunan piutang kepada PT Istaka Karya (Persero)                      allowance for impairment loss on receivable from
     sebesar Rp74.914.307.748 atau sebesar 100% dari                         PT Istaka Karya (Persero) amounting to
     nilai piutang. Tidak ada perubahan piutang pada                         Rp74,914,307,748 or 100% of the receivable.
     30 Juni 2023.                                                           There is no change in the balance of
                                                                             the receivable as of June 30, 2023.
     Indonesia Investment Authority (INA)                                    Indonesia Investment Authority (INA)

     Piutang lain-lain kepada kepada Indonesia Investment                    Other receivables from Indonesia Investment
     Authority    (INA)    merupakan    piutang   kepada                     Authority (INA) represent receivable from
     PT Pejagan Pemalang Toll Road dan PT Semesta                            PT Pejagan Pemalang Toll Road and
     Marga Raya yang dinovasikan dengan bunga 5,5%                           PT Semesta Marga Raya which are novated with
     dengan jangka waktu pembayaran 10 tahun.                                5.5% interest with a tenor of 10 years.

     Mutasi penyisihan kerugian penurunan nilai piutang                      The movements in allowance for impairment
     lain-lain adalah sebagai berikut:                                       losses on other receivables are as follows:

                                                    30 Juni/             31 Desember/
                                                 June 30, 2023         December 31, 2022
                                                      Rp                      Rp

      Saldo Awal                                  (335.206.427.351)       (399.631.219.058)                              Beginning Balance
      Penambahan PSAK 71 Tahun Berjalan             (7.251.496.528)        (13.828.321.570)             Addition of PSAK 71 for Current Year
      Pemulihan PSAK 71 Tahun Berjalan                           --         104.847.710.220            Recovery of PSAK 71 for Current Year
      Pelepasan Entitas Anak                                     --        (26.594.596.943)                       Divestment of Subsidiaries
      Saldo Akhir                                 (342.457.923.879)       (335.206.427.351)                                  Ending Balance


     Manajemen berkeyakinan bahwa jumlah cadangan                          The management believes that the allowance for
     kerugian penurunan nilai piutang lain-lain cukup                      impairment losses on other receivables is sufficient
     untuk menutupi kemungkinan tidak tertagihnya                          to cover the possible losses on the uncollectible
     piutang lain-lain di kemudian hari.                                   other receivables in the future.

     Pada tanggal 30 Juni 2023, tidak terdapat pemulihan                   As of June 30, 2023, there is no recovery of
     cadangan kerugian penurunan nilai piutang lain-lain                   allowance for impairment losses on other
     yang berasal pemulihan PSAK 71 tahun berjalan dan                     receivables came from recovery related to PSAK 71
     penambahan cadangan kerugian penurunan nilai                          for current year and addition allowance for
     PSAK 71 tahun berjalan sebesar Rp7.251.496.528                        impairment losses related to PSAK 71 amounting to
     (Catatan 43).                                                         Rp7,251,496,528 (Note 43).

     Pada tanggal 31 Desember 2022, pemulihan                              As of December 31, 2022, recovery of allowance for
     cadangan kerugian penurunan nilai piutang lain-lain                   impairment losses on other receivables came from
     yang berasal pemulihan PSAK 71 tahun berjalan                         recovery related to PSAK 71 for current year
     adalah    sebesar     Rp104.847.710.220        dan                    amounting to Rp104,847,710,220 and addition
     penambahan cadangan kerugian penurunan nilai                          allowance for impairment losses related to PSAK 71
     PSAK      71      tahun     berjalan      sebesar                     amounting to Rp13,828,321,570 (Note 43).
     Rp13.828.321.570 (Catatan 43).




                                                            89
Page 93
                                                                                The original consolidated financial statements included herein are in
                                                                                                                           the Indonesian language.


 PT WASKITA KARYA (PERSERO) TBK                                                     PT WASKITA KARYA (PERSERO) TBK
 DAN ENTITAS ANAK                                                                               AND ITS SUBSIDIARIES
 CATATAN ATAS LAPORAN KEUANGAN                                                 NOTES TO THE INTERIM CONSOLIDATED
 KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                           FINANCIAL STATEMENTS AS OF JUNE 30, 2023
 31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                  AND DECEMBER 31, 2022 AND FOR THE SIX
 ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                         MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
 (2022 – DIAUDIT) – Lanjutan                                                             (2022 – AUDITED) – Continued
 (Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                      (Expressed in full Rupiah amount, unless otherwise stated)

 9.      PERSEDIAAN - BERSIH                                                  9. INVENTORIES - NET

                                                       30 Juni/                   31 Desember/
                                                     June 30, 2023              December 31, 2022
                                                          Rp                           Rp
         Bahan Baku                                                                                                                        Raw Materials
          Konstruksi                                       403.804.336.674          366.269.646.540                                        Construction
          Beton Precast                                    192.347.044.662          212.277.810.494                                    Precast Concrete
          Produk Baja                                       25.433.735.781           23.327.098.155                                      Steel Products
         Sub Jumlah                                        621.585.117.117          601.874.555.189                                           Sub Total

         Persediaan dalam Pengembangan                                                                                                 Work in Progress
          Aset Real Estat                               3.286.025.519.453         3.488.147.286.439                                  Real Estate Assets
          Tanah yang Belum Dikembangkan                       795.739.844               795.739.844                                  Undeveloped Land
         Sub Jumlah                                     3.286.821.259.297         3.488.943.026.283                                            Sub Total

         Persediaan untuk Dijual                                                                                             Inventory Available for Sale
          Beton Precast                                    219.913.556.162          183.653.254.900                                    Precast Concrete
          Tanah Kavling Siap Dijual                            598.345.228              598.345.228                         Lots of Land Ready for Sale
          Produk Baja                                       58.530.557.373           58.128.757.373                                      Steel Products
         Sub Jumlah                                        279.042.458.763          242.380.357.501                                            Sub Total
         Jumlah                                         4.187.448.835.177         4.333.197.938.973                                                 Total
         Dikurangi: Penyisihan penurunan nilai                                                                     Less: Allowance for decline in Value of
          Persediaan                                       (89.428.414.615)         (49.737.760.986)                                          Inventories
         Jumlah                                         4.098.020.420.562         4.283.460.177.987                                                 Total


      Bahan baku konstruksi merupakan persediaan material                         Raw construction materials represents construction
      dan perlengkapan proyek yang masih tersedia di gudang                       materials and equipment supply projects that are
      proyek yang dimiliki oleh Grup. Persediaan material                         still available at the warehouse of existing projects
      terdiri dari persediaan besi, semen, solar, tiang pancang,                  owned by the Group. The raw materials consist of
      keramik/ marmer, traveler form, geotextile, aspal, dan                      iron, cement, diesel, pile, ceramic/ marble, traveler
      batu.                                                                       form, geotextile, asphalt, and stone.

      Beton precast merupakan persediaan produk beton unit                        Precast concrete represents the inventory of
      usaha precast yang terdiri dari persediaan barang jadi                      concrete products of precast business units
      produk beton, persediaan bahan baku, dan bahan                              consisting of concrete finished goods, raw materials
      penolong.                                                                   and supporting materials.

      Aset real estat merupakan bangunan apartemen yang                           Real estate assets represent apartment units ready
      siap dijual, tanah yang sedang dikembangkan dan                             for sale, land under development and buildings
      bangunan yang sedang dikonstruksi.                                          under construction.

      Berdasarkan penelaahan atas kondisi persediaan pada                         Based on the review of the condition of inventories
      akhir perode pelaporan, manajemen membentuk                                 at the end of the reporting period, management
      cadangan untuk penurunan nilai persediaan per                               provide an allowance for decline in value of
      30 Juni 2023 dan 31 Desember 2022 sebesar                                   inventories at June 30, 2023 and December 31,
      Rp89.428.414.615 dan Rp49.737.760.986.                                      2022 amounting to Rp89,428,414,615 and
                                                                                  Rp49,737,760,986.

10. TAGIHAN BRUTO KEPADA PENGGUNA JASA -                                 10. GROSS AMOUNTS DUE FROM CUSTOMERS -
    BERSIH                                                                   NET

                                                     30 Juni/              31 Desember/
                                                  June 30, 2023          December 31, 2022
                                                       Rp                       Rp
      Pihak Berelasi                               4.217.308.441.683           6.434.808.719.894                                       Related Parties
      Dikurangi: Aset Keuangan                                                                                                   Less: Financial Asset
       Saling Hapus                                (100.627.186.615)           (100.627.186.615)                                               Offset
      Sub Jumlah                                   4.116.681.255.068           6.334.181.533.279                                              Sub Total

      Pihak Ketiga                                 1.860.170.234.614           1.543.483.209.458                                           Third Parties
      Sub Jumlah                                   1.860.170.234.614           1.543.483.209.458                                              Sub Total
      Jumlah                                       5.976.851.489.682           7.877.664.742.737                                                   Total




                                                                90
Page 94
                                                                                   The original consolidated financial statements included herein are in
                                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                            PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                                      AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                                  FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                         AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                                MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                                    (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                          (Expressed in full Rupiah amount, unless otherwise stated)

   Rincian saldo tagihan bruto kepada pengguna jasa                                  The details of gross amount due from customers are
   adalah sebagai berikut:                                                           as follows:

                                                                                                           30 Juni/                31 Desember/
                                                                                                        June 30, 2023            December 31, 2022
                                                                                                             Rp                         Rp
     Pihak Berelasi/
      Related Parties
      PT Perusahaan Listrik Negara (Persero)                                                              1.906.329.680.401          3.580.819.758.064
      PT Jasamarga Japek Selatan                                                                            996.862.157.396          1.136.216.402.300
      PT Cimanggis Cibitung Tollways                                                                        710.364.806.901            950.459.342.956
      PT Hutama Marga Waskita                                                                               510.781.227.794            510.781.227.794
      PT Cibitung Tanjung Priok Port Tollways                                                               156.865.760.611            289.879.781.101
      PT Citra Karya Jabar Tol                                                                              144.545.454.545            144.545.454.545
      PT Hutama Karya (Persero)                                                                             115.543.659.083            186.628.482.271
      PT Angkasa Pura I (Persero)                                                                           105.264.893.851             58.785.518.783
      PT Kresna Kusuma Dyandra Marga                                                                         96.393.027.068            111.004.871.902
      PT Pelindo III (Persero)                                                                               69.812.676.326             85.021.629.056
      PT Angkasa Pura II (Persero)                                                                           51.465.575.377             64.624.950.380
      Lain-lain/ Others (di bawah/ below Rp 50 Milyar/ Billion )                                            122.313.727.910            150.757.952.987
      Dikurangi: Penyisihan Kerugian Ekspektasian Penurunan Nilai Tagihan Bruto/
       Less: Allowance For Impairment Expected Credit of Gross Amount due to from Customer                (769.234.205.580)           (834.716.652.245)
     Sub Jumlah/ Sub Total                                                                                4.217.308.441.683          6.434.808.719.894

                                                                                                           30 Juni/                31 Desember/
                                                                                                        June 30, 2023            December 31, 2022
                                                                                                             Rp                         Rp
     Pihak Ketiga/
      Third Parties
      Kementerian Pekerjaan Umum dan Perumahan Rakyat/
       The Ministry of Public Works and Housing                                                           1.322.674.587.676          1.075.519.621.979
      Pemerintah Daerah/ District Governments                                                               177.379.147.340            156.519.350.902
      PT Sulsel Citra Indonesia                                                                             137.685.920.529            137.685.920.529
      Lain-lain/ Others (di bawah/ below Rp 50 Milyar/ Billion )                                          1.381.454.688.827          1.300.237.755.908
      Dikurangi: Penyisihan Kerugian Ekspektasian Penurunan Nilai Tagihan Bruto/
       Less: Allowance For Impairment Expected Credit of Gross Amount due to from Customer              (1.159.024.109.758)         (1.126.479.439.860)
     Sub Jumlah/ Sub Total                                                                                1.860.170.234.614          1.543.483.209.458
     Jumlah/ Total                                                                                        6.077.478.676.297          7.978.291.929.352


    Informasi penting lainnya yang berkaitan dengan                                      Other important information regarding gross
    tagihan bruto kepada pengguna jasa adalah sebagai                                    amount due from customers are as follows:
    berikut:

     1. PT Perusahaan Listrik Negara (Persero) (PLN) –                                   1. PT Perusahaan Listrik Negara (Persero)
        Proyek Transmisi Sumatera 500 KVA                                                   (PLN) - Sumatera Transmission 500 KVA
                                                                                            Project

         Perusahaan mengadakan kontrak pekerjaan untuk                                       The Company entered into a construction
         Pembangunan Transmisi Sumatera 500 kVA                                              contract for the Sumatera Transmission 500
         Paket 1    No.     0532.PJ/DAN.02.02/DIR/2015,                                      kVA      Package      1    No.     0532.PJ/
         Paket 2 No. ADD3-0533.PJ/ DAN.02.02/DIR/2015,                                       DAN.02.02/DIR/ 2015, Package 2 No. ADD3-
         dan Paket 3 No. ADD1-0372-I.PJ/DAN.02.02/                                           0533.PJ/DAN. 02.02/DIR/2015, and Package
         DIR/2017    dengan    nilai   kontrak    masing-                                    3 No. ADD1-0372-I.PJ/DAN.02.02/DIR/2017
         masing       sebesar        Rp4.026.285.529.669,                                    with       a      contract     value     of
         Rp2.680.113.182.455 dan Rp2.684.429.824.467.                                        Rp4,026,285,529,669, Rp2,680,113,182,455
                                                                                             and Rp2,684,429,824,467, respectively.

     2. PT Jasamarga Japek Selatan – Proyek Jalan Tol                                    2. PT Jasamarga Japek Selatan – Jakarta
        Jakarta Cikampek II Selatan Paket III                                               Cikampek II Selatan Package III Toll Road
                                                                                            Project

         Perusahaan mengadakan kontrak pekerjaan untuk                                       The Company entered into a construction
         pembangunan Jalan Tol Jakarta – Cikampek II                                         contract for the Jakarta – Cikampek II Selatan
         Selatan Paket III dengan nomor kontrak                                              Package III Toll Road Project with contract


                                                                       91
Page 95
                                                                    The original consolidated financial statements included herein are in
                                                                                                               the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                               PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                         AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                           NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                     FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                            AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                   MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                       (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)           (Expressed in full Rupiah amount, unless otherwise stated)

        03/KONTRAK.JJS/2019 dengan             nilai   kontrak               No. 03/KONTRAK.JJS/2019 with a contract
        sebesar Rp3.493.213.750.909.                                         value of Rp3,493,213,750,909.

     3. PT Cimanggis Cibitung Tollways – Jalan Tol                       3. PT Cimanggis Cibitung Tollways – Jalan
        Cimanggis Cibitung Seksi I                                          Tol Cimanggis Cibitung Seksi I

        Perusahaan mengadakan kontrak pekerjaan untuk                        The Company entered into a construction
        pembangunan Jalan Tol Cimanggis Cibitung Seksi I                     contract for the Cimanggis Cibitung Section I
        No. 17/ADD-XVII/JKP/CCT/2020 pada tanggal                            Toll Road Project No. 17/ADDXVII/
        9 Oktober 2015 dengan nilai kontrak sebesar                          JKP/CCT/2020 dated October 9, 2015 with a
        Rp818.561.982.727 (tanpa PPN).                                       contract value of Rp818,561,982,727.

     4. PT Hutama Marga Waskita – Proyek Jalan Tol                       4. PT Hutama Marga Waskita – Tebing Tinggi
        Tebing Tinggi – Parapat                                             - Parapat Toll Road Project

        Perusahaan mengadakan kontrak pekerjaan untuk                        The Company entered into a construction
        pembangunan Jalan Tol Tebing Tinggi – Parapat                        contract for the Tebing Tinggi – Parapat Toll
        No. 006/ADD.KONTRAK-HMW/VIII/2020 dengan                             Road Project No. 006/ADD.KONTRAK-
        nilai kontrak sebesar Rp2.197.007.509.090.                           HMW/VIII/2020 with a contract value of
                                                                             Rp2,197,007,509,090.

     5. PT Cibitung Tanjung Priok Port Tollways –                        5. PT Cibitung Tanjung Priok Port Tollways –
        Proyek Jalan Tol Cibitung Cilincing                                 Cibitung Cilincing Toll Road Project

        Perusahaan mengadakan kontrak pekerjaan untuk                        The Company entered into a construction
        pembangunan Jalan tol Cibitung CIlincing                             contract for the Cibitung Cilincing Toll Road
        sesuai     dengan      addendum     perjanjian                       Project in accordance with the addendum of
        No.      007/ADD.IX/KONTRAK/WK-CTP/VI/2020                           agreement No. 007/ADD.IX/KONTRAK/WK-
        dengan        nilai      kontrak      sebesar                        CTP/VI/2020 with the contract value of
        Rp6.665.967.025.715 (tanpa PPN).                                     Rp6,665,967,025,715 (excluding VAT).

     6. PT Hutama Karya (Persero) – Proyek                               6. PT   Hutama    Karya    (Persero)   –
        Pembangunan Jalan Tol Terbanggi Besar-                              The Development of Terbanggi Besar –
        Pematang Panggang                                                   Pematang Panggang Toll Road Project

        Perusahaan mengadakan kontrak pekerjaan                              The Company entered into a construction
        No. PBJT/AF.3459/S.Perj/59/2019 dengan nilai                         contract No. PBJT/AF.3459/S.Perj/59/2019
        kontrak   sebesar   Rp442.499.784.161   untuk                        amounted      to    Rp442,499,784,161    for
        pembangunan Jalan Tol Terbanggi Besar-                               the development of Terbanggi Besar –
        Pematang       Panggang       Zona     HK-1,                         Pematang Panggang Zona HK-1 Toll Road
        Rp1.778.742.359.383 untuk pembangunan Jalan                          Project, amounted to Rp1,778,742,359,383
        Tol Terbanggi Besar- Pematang Panggang Zona                          for the development of Terbanggi Besar –
        HK-2, Rp856.654.890.679 untuk pembangunan                            Pematang Panggang Zona HK-2 Toll
        Jalan Tol Terbanggi Besar- Pematang Panggang                         Road        Project,      Rp856,654,890,679
        Zona HK-3, dan Rp185.741.098.521 untuk                               for the development of Terbanggi Besar –
        pembangunan Jalan Tol Terbanggi Besar-                               Pematang Panggang Zona HK-3 Toll Road
        Pematang Panggang Zona HK-4 Jembatan Sodong.                         Project,       and        Rp185,741,098,521
                                                                             for the development of Terbanggi Besar –
                                                                             Pematang Panggang Zona HK-4 Sodong
                                                                             Bridge Toll Road Project.

     7. PT Hutama Karya (Persero) – Proyek Pematang                      7. PT Hutama Karya (Persero) – Pematang
        Panggang – Kayu Agung                                               Panggang – Kayu Agung Project

        Perusahaan memperoleh kontrak pekerjaan                              The Company entered into a construction
        No.     PBJT/AF.3459/S.Perj/59/2019   untuk                          contract No. PBJT/AF.3459/S.Perj/59/2019
        pembangunan Jalan Tol Pematang Panggang –                            for the development of Pematang Panggang
        Kayu Agung dengan nilai kontrak sebesar                              – Kayu Agung Toll Road with a contract value
        Rp622.703.919.383 untuk Seksi 1, sebesar                             of Rp622,703,919,383 for Section 1,
        Rp434.890.726.064 untuk Seksi 1a, sebesar                            Rp434,890,726,064      for   Section     1a,
        Rp1.827.814.190.904 untuk Seksi 2, sebesar                           Rp1,827,814,190,904      for   Section     2,
        Rp1.020.944.279.465 untuk Seksi 2a, sebesar                          Rp1,020,944,279,465 for Section 2a,

                                                           92
Page 96
                                                                  The original consolidated financial statements included herein are in
                                                                                                             the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                             PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                       AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                         NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                   FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                          AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                 MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                     (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)         (Expressed in full Rupiah amount, unless otherwise stated)

        Rp506.693.608.324 untuk Seksi 2b, sebesar                          Rp506,693,608,324   for   Section  2b,
        Rp2.105.066.823.305      untuk    Seksi 3,                         Rp2,105,066,823,305   for  Section  3,
        Rp1.388.581.735.869 untuk Seksi 4, dan                             Rp1,388,581,735,869   for  Section  4,
        Rp517.365.548.368 untuk Seksi 4a.                                  and amounted to Rp517,365,548,368 for
                                                                           Section 4a.

     8. PT Kresna Kusuma Dyandra Marga – Proyek                        8. PT Kresna Kusuma Dyandra Marga –
        Jalan Tol Bekasi Cawang Kampung Melayu                            Bekasi Cawang Kampung Melayu Toll
                                                                          Road Project

        Perusahaan mengadakan kontrak pekerjaan untuk                     The Company entered into a construction
        pembangunan Jalan tol Bekasi Cawang Kampung                       contract for the Bekasi Cawang Kampung
        Melayu sesuai dengan addendum perjanjian                          Melayu Toll Road Project in accordance with
        No. 250/ADD-IV/S.Per/KKDM/V/2020 dengan nilai                     the addendum of agreement No. 250/ADD-
        kontrak sebesar Rp772.934.636.364 (tanpa PPN),                    IV/S.Per/KKDM/V/2020 with a contract value
        No. 320/ADD-IX/SP/KKDM/VIII/2020 dengan nilai                     of Rp772,934,636,364 (excluding VAT), No.
        kontrak sebesar Rp383.324.235.111 (tanpa PPN),                    320/ADD-IX/SP/KKDM/ VIII/2020 with a
        dan No. 331/AD-VIII/SP/KKDM/IX/2020 dengan nilai                  contract   value    of   Rp383,324,235,111
        kontrak sebesar Rp996.645.639.091 (tanpa PPN).                    (excluding    VAT),    and   No.    331/AD-
                                                                          VIII/SP/KKDM/IX/2020 with a contract value of
                                                                          Rp996,645,639,091 (excluding VAT).
     9. PT Sulsel Citra Indah – Pembangungan Twin                      9. PT Sulsel Citra Indah - The Development of
        Tower Makassar                                                     Twin Tower Makassar

        Perusahaan mengadakan kontrak pekerjaan untuk                      The Company entered into a construction
        pembangunan proyek Pembangunan Twin Tower                          contract on the development of Twin Tower
        Makassar No. 011/PJA-PT.SCI/DB-TTM/11/2020                         Makassar            No. 011/PJA-PT.SCI/DB-
        pada tanggal 01 Agustus 2017 dengan nilai kontrak                  TTM/11/2020 dated August 1, 2017 with
        sebesar Rp1.728.686.086.000.                                       contract value of Rp1,728,686,086,000.

     10. Kementerian Pekerjaan Umum dan Perumahan                      10. Ministry of Public Works and Housing –
         Rakyat – Proyek Pembangunan Pengaman                              The Development of Tanjung Lesung
         Pantai Kawasan Ekonomi Khusus Tanjung                             Special    Economic     Zone   Coastal
         Lesung                                                            Development Project

        Perusahaan mengadakan kontrak pekerjaan untuk                      The Company entered into a construction
        Proyek Pembangunan Pengaman Pantai Kawasan                         contract for the Tanjung Lesung Special
        Ekonomi         Khusus       Tanjung       Lesung                  Economic Zone Coastal Development Project
        No. HK.02.03/09-ADD II/APBN/SP.II/2021 dengan                      No. HK.02.03/09-ADD II/APBN/SP.II/2021
        nilai kontrak sebesar Rp227.194.050.000 (termasuk                  with a contract value of Rp227,194,050,000
        PPN).                                                              (including VAT).

     11. Kementerian Pekerjaan Umum dan Perumahan                      11. Ministry of Public Works and Housing –
         Rakyat – Proyek Pembangunan Bendungan                             The Development of Bener Dam Package II
         Bener Paket II

        Perusahaan mengadakan kontrak pekerjaan untuk                      The Company entered into a construction
        pembangunan Bendungan Bener Paket II                               contract for the development of Bener Dam
        No. Add 03/KSO-WSKTJATIWANGI/BENER-02/                             Package       II    No.    Add     03/KSO-
        2020    dengan     nilai  kontrak     sebesar                      WSKTJATIWANGI/BENER-02/2020            with
        Rp557.877.638.182.                                                 a contract value of Rp557,877,638,182.

     12. Kementerian Pekerjaan Umum dan Perumahan                      12. Ministry of Public Works and Housing –
         Rakyat – Proyek Pembangunan Bendungan                             The Development of Rukoh Dam Package
         Rukoh Paket II                                                    II

        Perusahaan mengadakan kontrak pekerjaan untuk                      The Company entered into a construction
        pembangunan Bendungan Rukoh Paket II Add IV                        contract for the development of Rukoh Dam
        No.   HK.01.02/Bws1.8.3/304   pada    tanggal                      Package         II     Add      IV     No.
        27 Agustus 2020 dengan nilai kontrak sebesar                       HK.01.02/Bws1.8.3/304 dated August 27,
        Rp595.368.766.619.                                                 2020     with      a  contract   value  of
                                                                           Rp595,368,766,619.

                                                          93
Page 97
                                                                             The original consolidated financial statements included herein are in
                                                                                                                        the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                       PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                                 AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                   NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                             FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                    AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                           MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                               (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                    (Expressed in full Rupiah amount, unless otherwise stated)

   Mutasi cadangan kerugian penurunan nilai tagihan bruto                      The movements in allowance for impairment losses
   kepada pengguna jasa dan pekerjaan dalam proses                             on gross amount due from customers and work in
   adalah sebagai berikut:                                                     progress are as follows:

                                                     30 Juni/               31 Desember/
                                                  June 30, 2023           December 31, 2022
                                                       Rp                        Rp

    Saldo Awal                                    (1.961.196.092.105)       (1.766.233.738.470)                                  Beginning Balance
    Penambahan PSAK 71 Tahun Berjalan               (159.428.249.877)         (532.913.464.204)                 Addition of PSAK 71 for Current Year
    Pemulihan PSAK 71 Tahun Berjalan                  192.366.026.644           384.518.998.345                Recovery of PSAK 71 for Current Year
    Pelepasan Entitas Anak                                          --         (46.567.887.776)                           Divestment of Subsidiaries
    Saldo Akhir/ Ending Balance                   (1.928.258.315.338)       (1.961.196.092.105)


   Manajemen berpendapat bahwa cadangan kerugian                              The management believes that allowance for
   penurunan nilai tagihan bruto kepada pengguna jasa                         impairment losses of gross amount due from
   adalah cukup untuk menutupi kemungkinan tidak                              customers is sufficient to cover the possible losses
   tertagihnya tagihan bruto di kemudian hari.                                on the uncollectible gross amount due from
                                                                              customers in the future.

   Pada tanggal 30 Juni 2023, terdapat penambahan                             As of June 30, 2023, the addition to allowance for
   cadangan kerugian penurunan nilai tagihan bruto kepada                     impairment losses on gross amount due from
   pengguna jasa yang berasal dari penambahan PSAK 71                         customers came from addition related to PSAK 71
   tahun berjalan sebesar Rp159.428.249.877 dan                               for current year amounting to Rp159,428,249,877
   pemulihan tahun berjalan sebesar Rp192.366.026.644                         and recovery in current year amounting to
   (Catatan 43).                                                              Rp192,366,026,644 (Note 43).

   Pada tanggal 31 Desember 2022, terdapat penambahan                         As of December 31, 2022, the addition to allowance
   cadangan kerugian penurunan nilai tagihan bruto kepada                     for impairment losses on gross amount due from
   pengguna jasa yang berasal dari penambahan PSAK 71                         customers came from addition related to PSAK 71
   tahun berjalan sebesar Rp532.913.464.204 dan                               for current year amounting to Rp532,913,464,204
   pemulihan tahun berjalan sebesar Rp384.518.998.345                         and recovery in current year amounting to
   (Catatan 43).                                                              Rp384,518,998,345 (Note 43).

   Analisa tagihan bruto kepada pengguna jasa kepada                          The analysis of gross amount due from customers
   pelanggan dan pekerjaan dalam proses berdasarkan                           and work in progress based on age are as follows:
   umur adalah sebagai berikut:

                                                    30 Juni/                31 Desember/
                                                 June 30, 2023            December 31, 2022
                                                      Rp                         Rp

    Belum Jatuh Tempo                              4.290.254.337.956         6.248.208.161.645                                         Not Yet Due
    Sudah Jatuh Tempo                                                                                                                      Past Due
     Sampai dengan 180 Hari                        1.129.540.479.168         1.003.393.779.620                                     Up to 180 Days
     > 181 - 360 Hari                              1.160.432.792.248           879.183.452.561                                    > 181 - 360 Days
     > 360 Hari                                    1.425.509.382.263         1.708.075.441.016                                         > 360 Days
    Jumlah                                         8.005.736.991.635         9.838.860.834.842                                                Total




                                                               94
Page 98
                                                                                  The original consolidated financial statements included herein are in
                                                                                                                             the Indonesian language.


 PT WASKITA KARYA (PERSERO) TBK                                                       PT WASKITA KARYA (PERSERO) TBK
 DAN ENTITAS ANAK                                                                                 AND ITS SUBSIDIARIES
 CATATAN ATAS LAPORAN KEUANGAN                                                   NOTES TO THE INTERIM CONSOLIDATED
 KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                             FINANCIAL STATEMENTS AS OF JUNE 30, 2023
 31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                    AND DECEMBER 31, 2022 AND FOR THE SIX
 ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                           MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
 (2022 – DIAUDIT) – Lanjutan                                                               (2022 – AUDITED) – Continued
 (Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                        (Expressed in full Rupiah amount, unless otherwise stated)

11. PERPAJAKAN                                                                 11. TAXES

     a. Pajak Dibayar Dimuka                                                       a. Prepaid Taxes

                                                        30 Juni/                    31 Desember/
                                                      June 30, 2023               December 31, 2022
                                                           Rp                            Rp
         Pasal 4 (2)                                                      --            18.395.208.545                                      Article 4(2)
         Pasal 22                                                                                                                            Article 22
          2023                                             5.600.354.773                             --                                           2023
          2022                                                         --                5.706.465.792                                            2022
         Pasal 23                                                                                                                            Article 23
          2023                                            41.763.558.226                             --                                           2023
          2022                                             2.944.124.878                 2.944.124.878                                            2022
          2021                                           165.336.230.217               165.336.230.217                                            2021
         Pasal 28A                                                                                                                          Article 28A
          2023                                               924.109.342                             --                                           2023
          2022                                               354.467.231                   354.467.231                                            2022
          2021                                             1.446.929.181                 1.446.929.181                                            2021
         Pajak Penghasilan atas Tanah dan Bangunan                                                                    Income Tax on Land and Buildings
          2023                                            16.528.840.109                              --                                          2023
         Pajak Pertambahan Nilai                                                                                                      Value Added Tax
          2023                                           508.469.930.221                             --                                           2023
          2022                                            71.945.695.932                71.945.695.932                                            2022
          2021                                            27.311.057.453                27.311.057.453                                            2021
          2020                                           282.498.701.271               282.498.701.271                                            2020
          2019                                             8.087.961.325                 8.087.961.325                                            2019
         Jumlah                                        1.133.211.960.159               584.026.841.825                                            Total


     b. Utang Pajak                                                                b. Taxes Payables

                                                        30 Juni/                    31 Desember/
                                                      June 30, 2023               December 31, 2022
                                                           Rp                            Rp
         Utang Pajak Jangka Pendek                                                                                          Short-Term Taxes Payable
          Pasal 21                                        12.426.270.459                61.854.137.577                                         Article 21
          Pasal 22                                         5.225.784.679                26.688.367.907                                         Article 22
          Pasal 23                                         4.248.845.512                13.639.784.600                                         Article 23
          Pajak Final Konstruksi                         751.680.496.136               686.117.504.155                           Construction Final Tax
          Pajak Pertambahan Nilai                      2.048.359.879.678             1.875.446.228.774                                Value Added Tax
          Pasal 4 (2) - Final                             11.775.538.269                63.423.400.302                               Article 4 (2) - Final
          Pasal 29                                        33.863.201.547               662.899.589.912                                         Article 29
          Pajak Daerah                                     1.607.499.118                             --                                         Local tax
          Pajak Penghasilan atas Tanah dan Bangunan        1.258.932.376                             --              Income Tax on Land and Buildings
         Total Utang Pajak Jangka Pendek               2.870.446.447.774             3.390.069.013.227                Total Short-Term Taxes Payable
         Utang Pajak Jangka Panjang                                                                                         Long-Term Taxes Payable
          Pajak Final Konstruksi                         283.619.686.764               395.990.566.546                         Construction Final Tax
         Total Utang Pajak Jangka Panjang                283.619.686.764               395.990.566.546                Total Long-Term Taxes Payable
         Jumlah                                        3.154.066.134.538             3.786.059.579.773                                           Total


     c. Beban (Manfaat) Pajak Penghasilan                                           c. Income Tax Expenses (Benefit)

                                                                30 Juni/ June 30,
                                                         2023                          2022
                                                          Rp                            Rp
         Beban Pajak Kini                                                                                                        Current Tax Expense
          Perusahaan                                                 --              14.132.032.075                                   The Company
          Entitas Anak                                  71.903.058.622              143.035.578.954                                      Subsidiaries
         Beban (Manfaat) Pajak Tangguhan                   511.426.444                  867.530.822                    Deferred Tax Expense (Benefit)
         Jumlah                                         72.414.485.066              158.035.141.851                                                Total




                                                                95
Page 99
                                                                                             The original consolidated financial statements included herein are in
                                                                                                                                        the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                                   PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                                             AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                                         FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                                AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                                       MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                                           (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                                    (Expressed in full Rupiah amount, unless otherwise stated)

    d. Pajak Tangguhan                                                                        d. Deferred Tax                                                     f.
                                                                                                                                                                  g.
                                                                                              (Dibebankan)               Dikreditkan (Dibebankan)
                                                                                              Dikreditkan ke                  ke Penghasilan
                                                                                           Laba Rugi/(Charged)              Komprehensif Lain/
                                               1 Januari/            Penyesuaian/            Credited to Profit                 Credited to                   30 Juni/
                                             January 1, 2023          Adjustment                 or Loss               Other Comprehensive Income          June 30, 2023
                                                   Rp                     Rp                        Rp                              Rp                          Rp
        Aset Pajak Tangguhan/
          Deferred Tax Assets
          TJT                                         379.438.312                    --                          --                                 --             379.438.312
          WTR                                      12.208.180.052                    --                          --                                 --          12.208.180.052
          WTTR                                         12.960.498                    --                          --                                 --              12.960.498
          WBW                                       2.002.543.709                    --                  1.640.548                                  --           2.004.184.257
          PBTR                                         67.978.740                    --                          --                                 --              67.978.740
          WST                                          21.704.343                    --                          --                                 --              21.704.343
        Jumlah Aset Pajak Tangguhan/
        Total Deferred Tax Assets                  14.692.805.654                    --                  1.640.548                                  --          14.694.446.202

        Liabilitas Pajak Tangguhan/
          Deferred Tax Liabilities
          WKR                                       6.100.593.183                    --              (513.066.992)                                  --           6.613.660.175
        Jumlah Liabilitas Pajak Tangguhan/
        Total Deferred Tax Liabilities              6.100.593.183                    --              (513.066.992)                                  --           6.613.660.175


                                                                                               (Dibebankan)              Dikreditkan (Dibebankan)
                                                                                               Dikreditkan ke                 ke Penghasilan
                                                                                            Laba Rugi/(Charged)             Komprehensif Lain/
                                               1 Januari/            Penyesuaian/             Credited to Profit                Credited to                 31 Desember/
                                             January 1, 2022          Adjustment                  or Loss              Other Comprehensive Income         December 31, 2022
                                                   Rp                     Rp                         Rp                             Rp                           Rp
        Aset Pajak Tangguhan/
          Deferred Tax Assets
          TJT                                         334.765.004            24.763.487                  19.909.821                                  --              379.438.312
          CCT                                         918.000.073         (918.000.073)                           --                                 --                        --
          WTR                                      33.805.094.879          (13.237.113)            (21.583.677.714)                                  --           12.208.180.052
          WTTR                                                  --           19.114.432                 (6.153.934)                                  --               12.960.498
          TTB                                           5.608.433                     --                (5.608.433)                                  --                        --
          WBW                                       2.001.643.235                     --                    900.474                                  --            2.002.543.709
          PBTR                                        331.314.320          (26.985.507)               (236.350.073)                                  --               67.978.740
          WST                                          12.918.350                     --                  8.785.993                                  --               21.704.343
        Jumlah Aset Pajak Tangguhan/
        Total Deferred Tax Assets                  37.409.344.294         (914.344.774)            (21.802.193.866)                                  --           14.692.805.654

        Liabilitas Pajak Tangguhan/
          Deferred Tax Liabilities
          WST                                          21.238.972                    --                  21.238.972                                  --                        --
          PBTR                                         26.985.507          (26.985.507)                           --                                 --                        --
          WKI                                          42.066.782          (42.066.782)                           --                                 --                        --
          WKR                                       5.578.955.869         (732.269.650)             (1.253.906.964)                                  --            6.100.593.183
        Jumlah Liabilitas Pajak Tangguhan/
        Total Deferred Tax Liabilities              5.669.247.130         (801.321.939)             (1.232.667.992)                                  --            6.100.593.183




                                                                           96
Page 100
                                                                         The original consolidated financial statements included herein are in
                                                                                                                    the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                 PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                           AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                       FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                              AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                     MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                         (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                (Expressed in full Rupiah amount, unless otherwise stated)

    e. Surat Ketetapan Pajak                                               e. Tax Assessment Letters                                     g.

       Perusahaan menerima Surat Tagihan Pajak sebesar                          The Company has received Tax Collection
       Rp5.279.569.187 terkait denda pajak, sebagai                             Letter amounting to Rp5.279.569.187 related to
       berikut:                                                                 administrative sanction of tax, as follows:
                 Jenis Pajak/      Masa Pajak/                                                                                     Terima (Bayar)/
                   Type of         Tax Period               Nomor STP/                   Tanggal/             STP/                  Cash Receipt
         No         Taxes                                   STP Number                    Date        Tax Collection Letter          (Payment)
          1      PPh Pasal 4(2)      01/2021              00002/140/21/093/23             14-Mar-23                  (6.157.332)       Bayar/ Paid
          2      PPh Pasal 4(2)      05/2021              00003/140/21/093/23             14-Mar-23                (38.051.478)        Bayar/ Paid
          3      PPh Pasal 4(2)      10/2020              00004/140/20/093/23             14-Mar-23               (143.857.162)        Bayar/ Paid
          4      PPh Pasal 4(2)      06/2021              00004/140/21/093/23             14-Mar-23                (22.585.091)        Bayar/ Paid
          5      PPh Pasal 4(2)      09/2020              00005/140/20/093/23             14-Mar-23               (244.109.429)        Bayar/ Paid
          6      PPh Pasal 4(2)      07/2021              00005/140/21/093/23             14-Mar-23                (15.533.005)        Bayar/ Paid
          7      PPh Pasal 4(2)      08/2020              00006/140/20/093/23             14-Mar-23               (223.706.642)        Bayar/ Paid
          8      PPh Pasal 21        11/2022              00202/101/22/408/23             14-Mar-23                   (477.989)        Bayar/ Paid
          9      PPh Pasal 21        12/2022              00138/101/22/922/23             16-Mar-23                   (100.000)        Bayar/ Paid
         10      PPh Pasal 23        01/2022              00002/103/22/307/23             17-Mar-23                     (28.982)       Bayar/ Paid
         11      PPh Pasal 21        12/2022              00061/101/22/307/23             17-Mar-23                   (197.973)        Bayar/ Paid
         12      PPh Pasal 21        11/2022              00062/101/22/307/23             17-Mar-23                   (151.257)        Bayar/ Paid
         13      PPh Pasal 21        10/2022              00063/101/22/307/23             17-Mar-23                   (153.442)        Bayar/ Paid
         14      PPh Pasal 21        09/2022              00064/101/22/307/23             17-Mar-23                   (224.763)        Bayar/ Paid
         15      PPh Pasal 21        08/2022              00065/101/22/307/23             17-Mar-23                   (146.986)        Bayar/ Paid
         16      PPh Pasal 21        07/2022              00066/101/22/307/23             17-Mar-23                   (802.714)        Bayar/ Paid
         17      PPh Pasal 21        06/2022              00067/101/22/307/23             17-Mar-23                   (489.471)        Bayar/ Paid
         18      PPh Pasal 21        05/2022              00068/101/22/307/23             17-Mar-23                  (1.399.582)       Bayar/ Paid
         19      PPh Pasal 21        04/2022              00069/101/22/307/23             17-Mar-23                  (5.026.116)       Bayar/ Paid
         20      PPh Pasal 21        03/2022              00070/101/22/307/23             17-Mar-23                  (1.935.325)       Bayar/ Paid
         21      PPh Pasal 21        04/2022              00037/101/22/513/23             21-Mar-23                   (250.564)        Bayar/ Paid
         22          PPN             03/2018              00023/187/20/093/23             28-Mar-23                (43.301.057)        Bayar/ Paid
         23          PPN             04/2018              00022/187/18/093/23             28-Mar-23               (233.089.566)        Bayar/ Paid
         24          PPN             10/2020              00024/187/20/093/23             28-Mar-23                (36.480.210)        Bayar/ Paid
         25          PPN             12/2020              00020/187/21/093/23             28-Mar-23                (17.234.601)        Bayar/ Paid
         26          PPN             01/2021              00021/187/18/093/23             28-Mar-23               (173.373.141)        Bayar/ Paid
         27          PPN             05/2021              00019/187/21/093/23             28-Mar-23                (64.151.468)        Bayar/ Paid
         28          PPN             05/2018              00024/187/18/093/23             31-Mar-23               (238.441.937)        Bayar/ Paid
         29          PPN             06/2018              00023/187/18/093/23             31-Mar-23               (196.839.342)        Bayar/ Paid
         30          PPN             7/2018               00025/187/18/093/23             18-Apr-23               (102.372.407)        Bayar/ Paid
         31          PPN             8/2018               00026/187/18/093/23             18-Apr-23                (63.495.300)        Bayar/ Paid
         32          PPN             9/2018               00027/187/18/093/23             18-Apr-23               (106.991.945)        Bayar/ Paid
         33          PPN             10/2018              00028/187/18/093/23             18-Apr-23               (138.643.758)        Bayar/ Paid
         34      PPh Pasal 21        2/2022               00124/101/22/093/23             18-Apr-23                (83.266.540)        Bayar/ Paid
         35      PPh Pasal 21        4/2020               00196/101/20/609/23             18-Apr-23                  (1.159.317)       Bayar/ Paid
         36      PPh Pasal 21        5/2020               00191/101/20/609/23             18-Apr-23                   (447.448)        Bayar/ Paid
         37      PPh Pasal 21        10/2022              00077/101/22/922/23             18-Apr-23                  (2.055.923)       Bayar/ Paid
         38      PPh Pasal 21        12/2022              00078/101/22/922/23             18-Apr-23                  (1.697.171)       Bayar/ Paid
         39      PPh Pasal 21        6/2020               00184/101/20/609/23             18-Apr-23                   (406.233)        Bayar/ Paid
         40      PPh Pasal 21        7/2020               00179/101/20/609/23             18-Apr-23                   (976.267)        Bayar/ Paid
         41       PPh Pasal 23       8/2021               00003/103/21/646/23             22-Apr-23                   (105.790)        Bayar/ Paid
         42       PPh Pasal 23       7/2021               00004/103/21/646/23             22-Apr-23                   (101.567)        Bayar/ Paid
         43       PPh Pasal 23       6/2021               00005/103/21/646/23             22-Apr-23                   (101.567)        Bayar/ Paid
         44       PPh Pasal 23       5/2021               00006/103/21/646/23             22-Apr-23                   (103.135)        Bayar/ Paid
         45       PPh Pasal 23       4/2021               00007/103/21/646/23             22-Apr-23                   (100.000)        Bayar/ Paid
         46       PPh Pasal 23       3/2021               00008/103/21/646/23             22-Apr-23                   (100.000)        Bayar/ Paid
         47       PPh Pasal 23       2/2021               00009/103/21/646/23             22-Apr-23                   (100.000)        Bayar/ Paid
         48       PPh Pasal 23       1/2021               00010/103/21/646/23             22-Apr-23                   (100.000)        Bayar/ Paid
         49       PPh Pasal 21       9/2021               00056/101/21/646/23             22-Apr-23                   (106.798)        Bayar/ Paid
         50       PPh Pasal 21       5/2021               00058/101/21/646/23             22-Apr-23                   (114.563)        Bayar/ Paid
         51       PPh Pasal 21       8/2021               00059/101/21/646/23             22-Apr-23                   (111.144)        Bayar/ Paid
         52       PPh Pasal 21       10/2021              00060/101/21/646/23             22-Apr-23                   (104.882)        Bayar/ Paid
         53       PPh Pasal 21       12/2022              00438/101/22/721/23             22-Apr-23                   (100.000)        Bayar/ Paid




                                                           97
Page 101
                                                                          The original consolidated financial statements included herein are in
                                                                                                                     the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                  PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                            AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                        FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                               AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                      MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                          (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                (Expressed in full Rupiah amount, unless otherwise stated)

                 Jenis Pajak/      Masa Pajak/                                                                                     Terima (Bayar)/
                   Type of         Tax Period               Nomor STP/                    Tanggal/             STP/                 Cash Receipt
         No         Taxes                                   STP Number                     Date        Tax Collection Letter         (Payment)
         48       PPh Pasal 23       1/2021               00010/103/21/646/23              22-Apr-23                   (100.000)      Bayar/ Paid
         49       PPh Pasal 21       9/2021               00056/101/21/646/23              22-Apr-23                   (106.798)      Bayar/ Paid
         50       PPh Pasal 21       5/2021               00058/101/21/646/23              22-Apr-23                   (114.563)      Bayar/ Paid
         51       PPh Pasal 21       8/2021               00059/101/21/646/23              22-Apr-23                   (111.144)      Bayar/ Paid
         52       PPh Pasal 21       10/2021              00060/101/21/646/23              22-Apr-23                   (104.882)      Bayar/ Paid
         53       PPh Pasal 21       12/2022              00438/101/22/721/23              22-Apr-23                   (100.000)      Bayar/ Paid
         54       PPh Pasal 21       8/2020               00032/101/20/322/23              22-Apr-23                   (720.779)      Bayar/ Paid
         55       PPh Pasal 21       2/2023               00005/101/23/307/23              22-Apr-23                   (116.382)      Bayar/ Paid
         56       PPh Pasal 21       10/2019              00179/101/19/115/23              22-Apr-23                   (100.000)      Bayar/ Paid
         57       PPh Pasal 21       9/2019               00182/101/19/115/23              22-Apr-23                   (100.000)      Bayar/ Paid
         58      PPh Pasal 22        3/2022               00001/102/22/093/23              12-Mei-23                (34.590.995)      Bayar/ Paid
         59      PPh Pasal 22        2/2022               00002/102/22/093/23              12-Mei-23                (52.351.429)      Bayar/ Paid
         60      PPh Pasal 22        1/2022               00003/102/22/093/23              12-Mei-23                (84.484.628)      Bayar/ Paid
         61        PPh Final         1/2022               00002/140/22/093/23              12-Mei-23               (134.845.463)      Bayar/ Paid
         62        PPh Final         3/2022               00003/140/22/093/23              12-Mei-23                (68.193.579)      Bayar/ Paid
         63        PPh Final         2/2022               00004/140/22/093/23              12-Mei-23                (86.420.587)      Bayar/ Paid
         64        PPh Final         7/2022               00001/140/22/093/23              12-Mei-23               (422.338.077)      Bayar/ Paid
         65      PPh Pasal 23        7/2022               00008/103/22/093/23              12-Mei-23                (53.383.431)      Bayar/ Paid
         66          PPN             12/2022              00095/107/22/093/23              12-Mei-23                 (2.566.831)      Bayar/ Paid
         67      PPh Pasal 23        9/2020               00082/103/20/502/23              24-Mei-23                   (151.084)      Bayar/ Paid
         68      PPh Pasal 23        12/2020              00084/103/20/502/23              24-Mei-23                   (100.000)      Bayar/ Paid
         69      PPh Pasal 23        8/2020               00085/103/20/502/23              24-Mei-23                   (186.321)      Bayar/ Paid
         70      PPh Pasal 23        10/2020              00086/103/20/502/23              24-Mei-23                   (136.360)      Bayar/ Paid
         71      PPh Pasal 23        11/2020              00087/103/20/502/23              24-Mei-23                   (107.238)      Bayar/ Paid
         72       PPh Pasal 21       9/2020               00239/101/20/502/23              24-Mei-23                   (454.269)      Bayar/ Paid
         73       PPh Pasal 21       10/2020              00240/101/20/502/23              24-Mei-23                   (336.018)      Bayar/ Paid
         74       PPh Pasal 21       8/2020               00245/101/20/502/23              24-Mei-23                 (1.142.808)      Bayar/ Paid
         75       PPh Pasal 21       1/2023               00002/101/23/437/23              24-Mei-23                   (100.000)      Bayar/ Paid
         76       PPh Pasal 21       2/2023               00003/101/23/437/23              24-Mei-23                   (100.000)      Bayar/ Paid
         77       PPh Pasal 21       11/2022              00044/101/22/437/23              24-Mei-23                   (302.676)      Bayar/ Paid
         78       PPh Pasal 21       10/2022              00045/101/22/437/23              24-Mei-23                   (721.946)      Bayar/ Paid
         79       PPh Pasal 21       6/2022               00046/101/22/437/23              24-Mei-23                 (1.274.378)      Bayar/ Paid
         80       PPh Pasal 21       7/2022               00047/101/22/437/23              24-Mei-23                 (1.094.796)      Bayar/ Paid
         81       PPh Pasal 21       8/2022               00048/101/22/437/23              24-Mei-23                   (693.454)      Bayar/ Paid
         82       PPh Pasal 21       9/2022               00049/101/22/437/23              24-Mei-23                   (992.493)      Bayar/ Paid
         83       PPh Pasal 21       12/2022              00050/101/22/437/23              24-Mei-23                   (288.739)      Bayar/ Paid
         84       PPh Pasal 21       1/2023               00008/101/23/108/23              26-Mei-23                   (100.000)      Bayar/ Paid
         85       PPh Pasal 21       3/2023               00009/101/23/108/23              26-Mei-23                    (53.694)      Bayar/ Paid
         86       PPh Pasal 21       2/2023               00010/101/23/108/23              26-Mei-23                   (100.000)      Bayar/ Paid
         87       PPh Pasal 21       11/2022              00119/101/22/108/23              26-Mei-23                   (157.463)      Bayar/ Paid
         88       PPh Pasal 21       12/2022              00120/101/22/108/23              26-Mei-23                   (159.084)      Bayar/ Paid
         89       PPh Pasal 23       6/2021               00060/103/21/502/23              26-Mei-23                   (107.315)      Bayar/ Paid
         90       PPh Pasal 23       7/2021               00061/103/21/502/23              26-Mei-23                   (107.315)      Bayar/ Paid
         91       PPh Pasal 23       5/2021               00062/103/21/502/23              26-Mei-23                   (114.630)      Bayar/ Paid
         92       PPh Pasal 23       8/2021               00063/103/21/502/23              26-Mei-23                   (157.904)      Bayar/ Paid
         93       PPh Pasal 21       6/2022               00153/101/22/502/23              26-Mei-23                   (110.372)      Bayar/ Paid
         94       PPh Pasal 21       3/2019               00280/101/19/502/23              26-Mei-23                 (2.722.619)      Bayar/ Paid
         95       PPh Pasal 21       12/2019              00281/101/19/502/23              26-Mei-23                 (1.316.587)      Bayar/ Paid
         96       PPh Pasal 21       9/2019               00282/101/19/502/23              26-Mei-23                       (399)      Bayar/ Paid
         97       PPh Pasal 21       11/2019              00283/101/19/502/23              26-Mei-23                   (224.732)      Bayar/ Paid
         98       PPh Pasal 21       10/2019              00284/101/19/502/23              26-Mei-23                   (351.945)      Bayar/ Paid
         99       PPh Pasal 21       1/2019               00285/101/19/502/23              26-Mei-23                    (16.209)      Bayar/ Paid
         100      PPh Pasal 21       2/2019               00286/101/19/502/23              26-Mei-23                (13.864.425)      Bayar/ Paid
         101      PPh Pasal 21       6/2022               00153/101/22/502/23'             29-Mei-23                       (360)      Bayar/ Paid
         102      PPh Pasal 21       10/2021              00157/101/21/502/23              29-Mei-23                   (210.047)      Bayar/ Paid
         103      PPh Pasal 21       10/2021              00066/103/21/502/23              29-Mei-23                   (100.000)      Bayar/ Paid
         104      PPh Pasal 21       8/2021               00154/101/21/502/23              29-Mei-23                   (349.471)      Bayar/ Paid
         105      PPh Pasal 21       9/2021               00155/101/21/502/23              29-Mei-23                   (241.222)      Bayar/ Paid
         106      PPh Pasal 21       6/2021               00156/101/21/502/23              29-Mei-23                   (100.000)      Bayar/ Paid
         107         PPN             12/2020              00084/107/19/093/23              21-Jun-23                   (100.000)      Bayar/ Paid
         108         PPN             6/2019               00085/107/19/093/23              21-Jun-23                   (500.000)      Bayar/ Paid




                                                           98
Page 102
                                                                         The original consolidated financial statements included herein are in
                                                                                                                    the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                 PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                           AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                       FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                              AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                     MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                         (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                (Expressed in full Rupiah amount, unless otherwise stated)

                 Jenis Pajak/      Masa Pajak/                                                                                      Terima (Bayar)/
                   Type of         Tax Period               Nomor STP/                   Tanggal/               STP/                 Cash Receipt
         No         Taxes                                   STP Number                    Date          Tax Collection Letter         (Payment)
         103      PPh Pasal 21       10/2021              00066/103/21/502/23             29-Mei-23                     (100.000)      Bayar/ Paid
         104      PPh Pasal 21       8/2021               00154/101/21/502/23             29-Mei-23                     (349.471)      Bayar/ Paid
         105      PPh Pasal 21       9/2021               00155/101/21/502/23             29-Mei-23                     (241.222)      Bayar/ Paid
         106      PPh Pasal 21       6/2021               00156/101/21/502/23             29-Mei-23                     (100.000)      Bayar/ Paid
         107         PPN             12/2020              00084/107/19/093/23             21-Jun-23                     (100.000)      Bayar/ Paid
         108         PPN             6/2019               00085/107/19/093/23             21-Jun-23                     (500.000)      Bayar/ Paid
         109         PPN             7/2019               00086/107/19/093/23             21-Jun-23                     (500.000)      Bayar/ Paid
         110         PPN             8/2019               00087/107/19/093/23             21-Jun-23                     (500.000)      Bayar/ Paid
         111         PPN             9/2019               00088/107/19/093/23             21-Jun-23                     (500.000)      Bayar/ Paid
         112         PPN             10/2019              00090/107/19/093/23             21-Jun-23                     (500.000)      Bayar/ Paid
         113         PPN             3/2019               00110/107/20/093/23             21-Jun-23                     (500.000)      Bayar/ Paid
         114         PPN             9/2020               00139/107/18/093/22             21-Jun-23                     (500.000)      Bayar/ Paid
         115         PPN             2/2018               00140/107/18/093/22             21-Jun-23                     (500.000)      Bayar/ Paid
         116         PPN             3/2018               00141/107/18/093/22             21-Jun-23                     (500.000)      Bayar/ Paid
         117         PPN             4/2018               00142/107/18/093/22             21-Jun-23                     (500.000)      Bayar/ Paid
         118      PPh Pasal 21       1/2018               00153/101/20/093/22             21-Jun-23                     (500.000)      Bayar/ Paid
         119      PPh Pasal 22       7/2022               00004/102/22/093/23             27-Jun-23                 (226.446.398)      Bayar/ Paid
         120      PPh Pasal 21       2/2023               00047/101/23/093/23             27-Jun-23                   (1.189.485)      Bayar/ Paid
         121      PPh Pasal 21       1/2023               00048/101/23/093/23             27-Jun-23                  (12.139.773)      Bayar/ Paid
         122      PPh Pasal 21       1/2022               00246/101/22/093/23             27-Jun-23                 (305.191.530)      Bayar/ Paid
         123      PPh Pasal 21       1/2022               00247/101/22/093/23             27-Jun-23                  (41.339.033)      Bayar/ Paid
         124      PPh Pasal 21       1/2022               00248/101/22/093/23             27-Jun-23                 (115.470.352)      Bayar/ Paid
         125      PPh Pasal 21       1/2022               00249/101/22/093/23             27-Jun-23                  (52.080.989)      Bayar/ Paid
         126      PPh Pasal 21       8/2022               00250/101/22/093/23             27-Jun-23                 (136.513.563)      Bayar/ Paid
         127      PPh Pasal 21       7/2022               00251/101/22/093/23             27-Jun-23                 (273.645.602)      Bayar/ Paid
         128      PPh Pasal 21       6/2022               00252/101/22/093/23             27-Jun-23                 (172.272.721)      Bayar/ Paid
         129      PPh Pasal 21       5/2022               00253/101/22/093/23             27-Jun-23                 (146.269.408)      Bayar/ Paid
         130      PPh Pasal 21       4/2022               00254/101/22/093/23             27-Jun-23                 (593.697.387)      Bayar/ Paid
         131      PPh Pasal 21       1/2019               00349/101/19/911/23             23-Jun-23                     (100.000)      Bayar/ Paid
         132      PPh Pasal 21       1/2020               00349/101/20/911/23             23-Jun-23                     (100.000)      Bayar/ Paid
         133      PPh Pasal 21       8/2020               00206/101/20/513/23              03-Jul-23                    (321.559)      Bayar/ Paid
         134      PPh Pasal 21       9/2020               00207/101/20/513/23              03-Jul-23                    (243.703)      Bayar/ Paid
         135      PPh Pasal 21       1/2020               00208/101/20/513/23              03-Jul-23                    (220.498)      Bayar/ Paid
         136      PPh Pasal 21       8/2022               00226/101/22/513/23              03-Jul-23                    (125.359)      Bayar/ Paid
         137      PPh Pasal 21       7/2022               00227/101/22/513/23              03-Jul-23                    (161.932)      Bayar/ Paid
         138      PPh Pasal 21       9/2022               00228/101/22/513/23              03-Jul-23                    (122.887)      Bayar/ Paid
         139      PPh Pasal 21       1/2022               00229/101/22/513/23              03-Jul-23                    (101.979)      Bayar/ Paid
         140      PPh Pasal 21       6/2022               00231/101/22/513/23              03-Jul-23                    (159.564)      Bayar/ Paid
         141      PPh Pasal 21       5/2022               00232/101/22/513/23              03-Jul-23                    (148.786)      Bayar/ Paid
         142      PPh Pasal 21       1/2022               00233/101/22/513/23              03-Jul-23                    (160.510)      Bayar/ Paid
         143      PPh Pasal 21       4/2022               00273/101/22/513/23              03-Jul-23                    (100.000)      Bayar/ Paid
         144      PPh Pasal 21       1/2023               00042/101/23/322/23              03-Jul-23                    (101.911)      Bayar/ Paid
         145      PPh Pasal 21       5/2020               00228/101/20/646/23              04-Jul-23                    (100.000)      Bayar/ Paid
         146      PPh Pasal 23       5/2019               00135/103/19/911/23              04-Jul-23                    (100.000)      Bayar/ Paid
         147      PPh Pasal 21       2/2019               00620/101/19/503/23              04-Jul-23                    (355.313)      Bayar/ Paid
         148      PPh Pasal 21       9/2022               00766/101/22/408/23              04-Jul-23                  (1.355.695)      Bayar/ Paid
         149      PPh Pasal 21       5/2022               00767/101/22/408/23              04-Jul-23                  (1.558.315)      Bayar/ Paid
         150      PPh Pasal 21       6/2022               00770/101/22/408/23              04-Jul-23                  (1.405.202)      Bayar/ Paid
         151      PPh Pasal 21       7/2022               00772/101/22/408/23              04-Jul-23                  (1.262.293)      Bayar/ Paid
         152      PPh Pasal 21       8/2022               00775/101/22/408/23              04-Jul-23                  (1.735.231)      Bayar/ Paid
         153      PPh Pasal 21       1/2022               00779/101/22/408/23              04-Jul-23                  (1.497.340)      Bayar/ Paid
         154      PPh Pasal 21       4/2022               00788/101/22/408/23              04-Jul-23                  (5.955.935)      Bayar/ Paid
                                                                                        Jumlah/ Total             (5.279.569.187)




                                                           99
Page 103
                                                                            The original consolidated financial statements included herein are in
                                                                                                                       the Indonesian language.


 PT WASKITA KARYA (PERSERO) TBK                                                     PT WASKITA KARYA (PERSERO) TBK
 DAN ENTITAS ANAK                                                                               AND ITS SUBSIDIARIES
 CATATAN ATAS LAPORAN KEUANGAN                                                 NOTES TO THE INTERIM CONSOLIDATED
 KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                           FINANCIAL STATEMENTS AS OF JUNE 30, 2023
 31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                  AND DECEMBER 31, 2022 AND FOR THE SIX
 ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                         MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
 (2022 – DIAUDIT) – Lanjutan                                                             (2022 – AUDITED) – Continued
 (Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                 (Expressed in full Rupiah amount, unless otherwise stated)

12. UANG MUKA DAN BIAYA DIBAYAR DIMUKA                                  12. ADVANCES AND PREPAYMENTS

                                                     30 Juni/              31 Desember/
                                                   June 30, 2023         December 31, 2022
                                                        Rp                      Rp

     PPN Keluaran Yang Belum Diterima                 344.434.254.134         262.685.873.866                             VAT Out Not Yet Received
     Uang Muka Investasi                              280.000.000.000         280.000.000.000                              Advances for Investment
     Uang Muka Kontrak                                387.405.325.146         217.960.395.792                               Advances for Contracts
     Biaya Dibayar Dimuka                             160.633.247.866          68.030.033.768                                   Prepaid Expenses
     Uang Muka Beban Umum                                                                                                     Advances for General
      dan Administrasi                                    427.132.651              23.148.148                                  and Administration
     Lain-lain                                          3.315.792.776           2.694.634.390                                               Others
     Jumlah                                         1.176.215.752.573         831.394.085.964                                                Total


    Pajak Pertambahan Nilai (PPN) Keluaran yang belum                      Value Added Tax (VAT) Out which are not yet
    diterima merupakan pengakuan PPN keluaran atas                         received represents recognition of VAT output on
    termin yang telah ditagihkan, namun belum dibayar                      receivables, for which the project owner have not yet
    oleh pemberi kerja.                                                    paid.

    Biaya dibayar dimuka merupakan biaya yang                              Prepayments represent the cost incurred for projects
    dikeluarkan untuk proyek-proyek belum berjalan, biaya                  not yet started, the provision cost of Letter of Credit
    provisi Letter of Credit (L/C) dan Surat Kredit                        (L/C) and Surat Kredit Berdokumen Dalam Negeri
    Berdokumen Dalam Negeri (SKBDN). Penyelesaian                          (SKBDN). The Completion prepayments is calculated
    biaya dibayar dimuka diperhitungkan pada saat proyek                   when the projects start, while provision fee
    sudah berjalan, untuk biaya provisi diakui setiap bulan.               is recognized every month.

    Uang muka kontrak diberikan kepada subkontraktor,                      Advances for contracts represent payment to
    pemasok dan mandor borong yang bekerja pada                            subcontractors, suppliers and the entire stock who
    proyek yang dilaksanakan oleh Grup. Penyelesaian                       worked on the Group’s projects. The settlement of
    uang muka akan diperhitungkan dengan termin yang                       advance will be calculated based on the invoice that
    akan dibayarkan kepada pihak ketiga yang                               will be paid related to third parties concerned.
    bersangkutan.

    Uang muka investasi merupakan pembayaran kepada                        Advances for investment represent payments to
    PT Asuransi Jiwasraya (Persero) atas surat penawaran                   PT Asuransi Jiwasraya (Persero) for the offering letter
    kerjasama aset properti investasi melalui konsorsium                   of joint investment property assets through
    Perusahaan, PT Wijaya Karya (Persero) Tbk,                             a consortium of the Company, PT Wijaya Karya
    PT Pembangunan Perumahan (Persero) Tbk, PT Adhi                        (Persero) Tbk, PT Pembangunan Perumahan
    Karya (Persero) Tbk, dan PT Hutama Karya (Persero).                    (Persero) Tbk, PT Adhi Karya (Persero) Tbk, and
    Perjanjian konsorsium tersebut terbentuk untuk                         PT Hutama Karya (Persero). The Consortium
    melakukan optimalisasi properti (tanah dan bangunan)                   agreement was formed to optimize the property (land
    milik PT Asuransi Jiwasraya (Persero) sesuai dengan                    and building) owned by PT Asuransi Jiwasraya
    Perjanjian No. 161.SJ.U.1018 dan No. TP.01.03/A.DIR.                   (Persero) in accordance with agreement No.
    16877/ 2018 tanggal 11 Oktober 2018.                                   161.SJ.U.1018 and No. TP.01.03/A.DIR. 16877/2018
                                                                           dated October 11, 2018.

    Sesuai dengan perjanjian pendahuluan antara                            In accordance with the preliminary agreements
    PT Asuransi Jiwasraya (Persero) dengan konsorsium                      between PT Asuransi Jiwasraya (Persero) with
    BUMN Karya bahwa tanda minat atas rencana                              a consortium of BUMN Karya that the sign of interest
    pengembangan atau pengalihan hak atas obyek                            in the development plan or transfer of rights to
    optimalisasi adalah sebesar Rp1.400.000.000.000.                       the optimization object is Rp1,400,000,000,000. The
    Jumlah pembagian porsi untuk masing-masing BUMN                        number of servings for each BUMN Karya is 20%,
    Karya adalah 20%, sehingga jumlah penyertaan                           so the amount of company's inclusion in
    Perusahaan dalam konsorsium tersebut adalah                            the consortium is Rp280,000,000,000.
    Rp280.000.000.000.




                                                              100
Page 104
                                                                                                               The original consolidated financial statements included herein are in
                                                                                                                                                          the Indonesian language.


 PT WASKITA KARYA (PERSERO) TBK                                                                                  PT WASKITA KARYA (PERSERO) TBK
 DAN ENTITAS ANAK                                                                                                            AND ITS SUBSIDIARIES
 CATATAN ATAS LAPORAN KEUANGAN                                                                              NOTES TO THE INTERIM CONSOLIDATED
 KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                                                        FINANCIAL STATEMENTS AS OF JUNE 30, 2023
 31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                                               AND DECEMBER 31, 2022 AND FOR THE SIX
 ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                                                      MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
 (2022 – DIAUDIT) – Lanjutan                                                                                          (2022 – AUDITED) – Continued
 (Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                                                     (Expressed in full Rupiah amount, unless otherwise stated)

13. INVESTASI PADA ENTITAS                                 ASOSIASI                 DAN             13. INVESTMENT                            IN    ASSOCIATES                           AND        JOINT
    VENTURA BERSAMA                                                                                     VENTURES

     Rincian saldo investasi pada entitas asosiasi dan                                                        The details of investments in associates and joint
     ventura bersama adalah sebagai berikut:                                                                  ventures are as follows:

                                                                                                                                                        30 Juni/                          31 Desember/
                                                                                                                                                      June 30, 2023                     December 31, 2022
                                                                                                                                                           Rp                                  Rp
    Investasi pada Entitas Asosiasi/ Investments in Associates                                                                                           154.967.571.760                    169.985.604.707
    Investasi pada Ventura Bersama/ Investments in Joint Ventures                                                                                      2.201.057.062.556                  2.438.520.076.387
    Jumlah/ Total                                                                                                                                      2.356.024.634.316                  2.608.505.681.094


   Investasi pada Asosiasi                                                                                       Investment in Associates

   Rincian saldo investasi pada asosiasi adalah sebagai                                                          Details of investments in associates are as follows:
   berikut:

                                                                                    30 Juni/                      31 Desember/
                                                                                  June 30, 2023                 December 31, 2022                   Aktivitas utama/                        Kedudukan/
                                                                                       Rp                              Rp                           Principal activity                       Domicile
    PT Cimanggis Cibitung Tollways                                                    135.183.785.418                   150.223.355.789 Operator Jalan Tol/ Toll operator                     Indonesia
    PT Hotel Karya Indonesia                                                           16.033.786.342                    16.012.248.918 Hotel/ Hotel                                          Indonesia
    PT Waskita Bali Mandara                                                             3.750.000.000                     3.750.000.000 Operator Jalan Tol/ Toll operator                     Indonesia
    Jumlah/ Total                                                                     154.967.571.760                   169.985.604.707


     Rincian dan mutasi investasi pada entitas asosiasi pada                                                     The details of ownership interest and movements of
     tanggal 30 Juni 2023 dan 31 Desember 2022 adalah                                                            investment in associates entities as of
     sebagai berikut:                                                                                            June 30, 2023 and December 31, 2022 are as
                                                                                                                 follows:

                                                                                                                     30 Juni/ June 30, 2023
                                                                                                                   Bagian laba (rugi)
                                                            Saldo awal/                                             entitas asosiasi/
                                                            Beginning                 Penambahan/             Equity in net income profit     Pengurangan/          Penyesuaian/             Saldo akhir/
                                                 %           balance                    Addition                 (loss) of associates          Deduction             Adjustment             Ending balance
                                                                Rp                        Rp                               Rp                     Rp                     Rp                       Rp

    PT Cimanggis Cibitung Tollways              35,00         150.223.355.789                           --                (15.039.570.371)                   --                     --           135.183.785.418
    PT Hotel Karya Indonesia                    25,00          16.012.248.918                           --                     21.537.424                    --                     --            16.033.786.342
    PT Waskita Bali Mandara                     60,00           3.750.000.000                           --                              --                   --                     --             3.750.000.000
    Jumlah/ Total                                              169.985.604.707                          --                (15.018.032.947)                   --                     --           154.967.571.760


                                                                                                               31 Desember/ December 31, 2022
                                                                                                                   Bagian laba (rugi)
                                                            Saldo awal/                                             entitas asosiasi/
                                                            Beginning                 Penambahan/             Equity in net income profit    Pengurangan/          Penyesuaian/              Saldo akhir/
                                                 %           balance                    Addition                 (loss) of associates         Deduction             Adjustment              Ending balance
                                                                Rp                        Rp                               Rp                    Rp                     Rp                        Rp
    PT Cimanggis Cibitung Tollways              35,00                        --          166.980.255.210                    (16.756.899.421)                 --                    --           150.223.355.789
    PT Hotel Karya Indonesia                    25,00           15.944.464.191                         --                        67.784.727                  --                    --            16.012.248.918
    PT Waskita Bali Mandara                     60,00            3.750.000.000                         --                                 --                 --                    --              3.750.000.000
    PT Waskita Transjawa Toll Road              39,50        1.136.212.147.356                         --                 1.480.888.235.930                  --   (2.617.100.383.286)                          --
    Jumlah/ Total                                             1.155.906.611.547          166.980.255.210                  1.464.199.121.236                  --   (2.617.100.383.286)           169.985.604.707


     PT Cimanggis Cibitung Tollways (CCT)                                                                        PT Cimanggis Cibitung Tollways (CCT)

     Pendirian PT CCT (kepemilikan tidak langsung melalui                                                         The establishment of PT CCT (indirect ownership
     WTR) adalah sesuai dengan akta notaris No. 52 tanggal                                                        through WTR) was based on notarial deed No. 52
     22 Februari 2008 dari notaris Agus Madjid, S.H. M.Kn.                                                        dated February 22, 2008 of notary Agus Madjid,
     Akta pendirian ini telah mendapat persetujuan oleh                                                           S.H. M.Kn. The deed was approved by
     Menteri Hukum dan Hak Asasi Manusia melalui surat                                                            the Minister of Law and Human Rights through
     keputusan    No.     AHU-09738.AH.01.01.Tahun.2008                                                           decision     letter  No.     AHU-09738.AH.01.
     tanggal 27 Februari 2008.                                                                                    01.Tahun.2008 dated February 27, 2008.



                                                                                         101
Page 105
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

   Selanjutnya, peralihan pemegang saham PT. CCT                     Furthermore, the change in ownership of PT CCT
   kepada WTR dilakukan berdasarkan dengan akta notaris              to WTR was based on notarial deed No. 30 dated
   No. 30 tanggal 13 Juli 2015 dari notaris Jose Dima Satria,        July 13, 2015 of notary Jose Dima Satria, S.H.
   S.H. M.Kn.                                                        M.Kn.

   Anggaran Dasar Perusahaan telah beberapa kali                     The Company's Articles of Association has been
   mengalami perubahan. Berdasarkan Akta No. 06                      amended several times. Based on Deed No. 6
   Perubahan tanggal 2 Oktober 2019 oleh Shasa Adisa                 dated October 2, 2019 by Shasa Adisa Putrianti,
   Putrianti, S.H., M.H., Notaris di Jakarta dan telah               S.H., M.H., Notary in Jakarta, which has been
   mendapat pengesahan dari Menteri Hukum dan Hak                    approved by the Minister of Law and Human Rights
   Asasi Manusia melalui Surat Keputusan No. AHU-                    in his Decision Letter No. AHU-0078654.AH. 01.02
   0078654.AH. 01.02 tanggal 4 Oktober 2019. Perubahan               dated October 4, 2019, amendment to the CCT’s
   anggaran dasar terakhir tersebut berkaitan dengan tugas           articles of association is related to duties and
   dan wewenang direksi.                                             authority of the directors.

   Berdasarkan akta No. 67 tanggal 30 Juni 2022 oleh                 Based on Notarial Deed No. 67 dated June 30,
   Lestiani Wang, S.H., M.Kn., WTR melepas saham                     2022 by Lestiani Wang, S.H. M.Kn., WTR sold its
   di CCT kepada PT Sarana Multi Infrastruktur dengan                ownership or equivalent to 44,000,000 shares in
   harga sebesar Rp44.000.000.000 atau setara dengan                 shares at CCT to PT Sarana Multi Infrastruktur
   44.000.000 lembar saham. Kepemilikan saham WTR di                 amounting to consideration of Rp44,000,000,000.
   PT. CCT menjadi sebesar 35% dari modal yang disetor.              WTR's share ownership in CCT was reduced to
   Grup mengakui keuntungan dari penjualan sebagian                  35%. The Group recognized a gain on partial
   CCT sebesar Rp76.602.456.099 sebagai pendapatan                   disposal of CCT amounting to Rp76,602,456,099
   (beban) lain-lain - bersih.                                       which is included on other income (expense) - net.

   PT Hotel Karya Indonesia (HKI)                                    PT Hotel Karya Indonesia (HKI)

   Pendirian PT HKI adalah sesuai dengan akta notaris No.            The establishment of PT HKI was in accordance
   10 Cintya Ayu Rashanty, S.H., M.Kn., tanggal 29 Oktober           with notarial deed No. 10 of Cintya Ayu Rashanty,
   2018. Akta ini telah mendapat pengesahan Menteri                  S.H., M.Kn., dated October 29, 2018. This deed has
   Hukum dan Hak Asasi Manusia dalam surat keputusan                 been approved by the Minister of Law and Human
   No. AHU-0053574.AH.01.01 Tahun 2018 tanggal 9                     Rights in his decree No. AHU-0053574.AH.01.01
   November 2018.                                                    2018 dated November 9, 2018.

   Berdasarkan akta notaris Cintya Ayu Rishanty, S.H.,               Based on notarial deed No. 15 of Cintya Ayu
   M.Kn., No. 15 tanggal 28 Januari 2019, WKR memiliki               Rishanty, S.H., dated January 28, 2019, WKR
   penyertaan di HKI sebesar Rp15.525.000.000, Akta ini              has    investment     in   HKI   amounting    to
   telah mendapat pengesahan Menteri Hukum dan Hak                   Rp15,525,000,000. This deed has been approved
   Asasi Manusia sesuai dengan Surat Keputusan                       by the Minister of Law and Human Rights based on
   No. AHU-0017985.AH.01.11.Tahun 2019 tanggal                       decree No. AHU-0017985.AH.01.11.Tahun 2019
   4 Februari 2019.                                                  dated February 4, 2019.

   PT Waskita Bali Mandara (WBM)                                     PT Waskita Bali Mandara (WBM)

   WTR, entitas anak, memiliki penyertaan sebesar 60%                WTR, a subsidiary, has 60% ownership in WBM.
   pada WBM. WBM didirikan sesuai Akta Pendirian No. 6               WBM was established under the Deed of
   tanggal 13 November 2015 dari Notaris Jose Dima                   Establishment No. 6 dated November 13, 2015 of
   Satria, S.H., M.Kn. WBM belum memiliki hak                        Notary Jose Dima Satria, S.H., M.Kn. WBM has no
   pengusahaan jalan tol.                                            toll road concession right.

   PT Waskita Transjawa Toll Road (WTTR)                             PT Waskita Transjawa Toll Road (WTTR)

   Pendirian PT Waskita MNC Transjawa Toll Road adalah               The establishment of PT Waskita MNC Transjawa
   sesuai dengan akta notaris Fathiah Helmi, S.H., No. 25            Toll Road was based on notarial deed No. 25 dated
   tanggal 28 September 2015. Akta pendirian ini telah               September 28, 2015 of notary Fathiah Helmi, S.H.
   mendapat pengesahan Menteri Hukum dan Hak Asasi                   This notarial deed has been approved by The
   Manusia     sesuai    dengan      Surat    Keputusan              Minister of Law and Human Rights through decision
   No.      AHU-2458481.AH.01.01.TH.2015          tanggal            letter No. AHU-2458481.AH.01.01. TH.2015 dated
   29 September 2015.                                                September 29, 2015.



                                                          102
Page 106
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

   Berdasarkan akta notaris No. 32 Catur Virgo, S.H., M.H.,          Based on notarial deed No. 32 of Catur Virgo, S.H.,
   tanggal 27 Mei 2016 telah disetujui perubahan nama dari           M.H., dated May 27, 2016, the name of
   “PT Waskita MNC Transjawa Toll Road” menjadi                      “PT Waskita MNC Transjawa Toll Road” was
   “PT Waskita Transjawa Toll Road”. Akta tersebut telah             changed into “PT Waskita Transjawa Toll Road”.
   disahkan oleh Menteri Hukum dan Hak Asasi Manusia                 The deed was approved by the Minister of Law and
   dalam surat keputusan No. AHU-AH.01.03-005.3.001                  Human Rights through decision letter No. AHU-
   tanggal 31 Mei 2016.                                              AH.01.03-005.3.001 dated May 31, 2016.

   Berdasarkan akta notaris No. 23 tanggal 10 April 2018             Based on notarial deed No. 23 dated April 10, 2018,
   oleh Ir. Nanette Cahyanie Handari Adi Warsito, S.H.,              by Ir. Nanette Cahyanie Handari Adi Warsito, S.H.,
   WTR menjual 57,14% kepemilikan saham di WTTR                      WTR sold its 57.14% ownership WTTR at a price of
   dengan harga sebesar Rp2.857.143.347.539 kepada                   Rp2,857,143,347,539 to Limited Investment Fund
   RDPT. Kepemilikan saham WTR di WTTR menjadi                       (RDPT). WTR’s share ownership in WTTR became
   sebesar 42,85% setelah penjualan tersebut. Akta                   42.85% after the sale of transaction. The deed was
   tersebut telah disahkan oleh Menteri Hukum dan Hak                approved by the Minister of Law and Human Rights
   Asasi Manusia dalam Surat Keputusan No. AHU-                      through decision letter No. AHU-0050658.AH.01.11
   0050658.AH.01.11 tanggal 11 April 2018.                           dated April 11, 2018.

   Berdasarkan akta notaris No. 26 tanggal 11 April 2018             Based on notarial deed No. 26 dated April 11, 2018,
   oleh Ir. Nanette Cahyanie Handari Adi Warsito, S.H.,              by Ir. Nanette Cahyanie Handari Adi Warsito, S.H.,
   kepemilikan saham WTR di WTTR menjadi sebesar                     WTR’s share ownership in WTTR became 29.99%.
   29,99%. Akta tersebut telah disahkan oleh Menteri                 The        deed      was        approved         by
   Hukum dan Hak Asasi Manusia dalam Surat Keputusan                 the Minister of Law and Human Rights through
   No. AHU-AH.01.03-0144385 tanggal 12 April 2018.                   decision letter No. AHU-AH.01.03-0144385 dated
                                                                     April 12, 2018.

   WTR melakukan Put Option atas Kepemilikan                         WTR performed a Put Option on Shares Ownership
   saham di WTTR sebesar 4,75%, sesuai dengan                        in WTTR of 4.75%, based on shareholders
   Perjanjian Antar Pemegang Saham No. 25                            agreement No. 25 dated April 10, 2018 Article 6.3
   tanggal 10 April 2018 Pasal 6.3 perihal Pengalihan                regarding         the         transfer         of
   Saham – Put Option dan Call Option sebesar                        shares – Put Option and Call Option amounting to
   Rp420.070.567.530,   kepemilikan    saham    WTR                  Rp420,070,567,530,    thereby    WTR’s     share
   di WTTR menjadi sebesar 34,75%.                                   ownership in WTTR became 34.75%.

   WTR melakukan Put Option Tahun II atas Kepemilikan                WTR performed a Put Option Tahun II on Shares
   saham di WTTR sebesar 4,75%, sesuai dengan Akta                   Ownership in WTTR of 4.75%, based on Notarial
   Notaris No. 01 tanggal 1 April 2020 dari Notaris                  Deed No. 1 dated April 1, 2020, of Notary
   Ir. Nanette C.H. Adi Warsito, S.H. sebesar                        Ir. Nanette C.H. Adi Warsito, S.H. thereby
   Rp467.433.619.437, kepemilikan saham WTR di WTTR                  amounting to Rp467,433,619,437, WTR’s share
   menjadi sebesar 39,10%.                                           ownership in WTTR became 39.10%.

   Berdasarkan Dokumen Berita Acara Rapat Umum                       Based on the Minutes of the General Meeting of the
   Pemegang Unit Penyertaan Terbatas Ekuitas Danareksa               Holders of the Trans Java Infrastructure Limited
   Infrastruktur    Trans   Jawa     No.   89     tanggal            Equity Participation Unit No. 89 dated
   27     Juli   2022,    Grup   melakukan     pelunasan             July 27, 2022, the Group paid off the unit ownership
   secara      bertahap    kepemilikan   unit    sebesar             in stages amounting to Rp5,256,112,000,000 or
   Rp5.256.112.000.000 atau setara dengan 80,2%                      equivalent to 80.2% share ownership of RDPT in
   kepemilikan saham RDPT di WTTR yang dilaksanakan                  WTTR which was implemented on August 30, 2022.
   pada 30 Agustus 2022. atas dasar tersebut, Group telah            On this basis, the Group has controlled the WTTR
   mengendalikan WTTR yang semula dikendalikan oleh                  which was previously controlled by the RDPT.
   RDPT. Sehingga WTTR terkonsolidasi per 31 Agustus                 Accordingly, that WTTR is consolidated as of
   2022.                                                             August 31, 2022.

   Manajemen berpendapat bahwa tidak terdapat                        Management believes there is no impairment on
   penurunan nilai atas investasi pada entitas asosiasi.             investment in associates.




                                                          103
Page 107
                                                                                                     The original consolidated financial statements included herein are in
                                                                                                                                                the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                                         PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                                                   AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                     NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                                               FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                                      AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                                             MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                                                 (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                                         (Expressed in full Rupiah amount, unless otherwise stated)

   Jumlah aset, liabilitas, aset, dan laba/rugi entitas asosiasi                                       Total assets, liabilities, revenues and income/loss of
   adalah sebagai berikut:                                                                             associates are as follows:

                                                                                                          30 Juni/ June 30, 2023
                                                                   Aset/                        Liabilitas/                   Pendapatan/                                 Laba (Rugi)/
                                                                  Assets                        Liabilities                    Revenue                                    Profit (Loss)
                                                                    Rp                             Rp                             Rp                                           Rp
    PT Waskita Bali Mandara                                         4.117.021.417                       1.000.000                                       --                            28.801.650
    PT Hotel Karya Indonesia                                       58.492.292.342                   4.382.057.317                                       --                            86.149.695
    PT Cimanggis Cibitung Tollways                             10.420.082.217.608               8.204.333.491.320                         594.999.576.486                       (42.970.201.056)

                                                                                                   31 Desember/ December 31, 2022
                                                                   Aset/                        Liabilitas/              Pendapatan/                                      Laba (Rugi)/
                                                                  Assets                        Liabilities               Revenue                                         Profit (Loss)
                                                                    Rp                             Rp                         Rp                                               Rp

    PT Waskita Transjawa Toll Road                             15.726.652.560.041            13.064.727.878.110                        1.073.315.115.601                       (442.590.524.888)
    PT Waskita Bali Mandara                                         4.002.313.139                     1.000.000                                        --                             27.895.731
    PT Hotel Karya Indonesia                                       68.227.334.527                 4.363.956.614                                        --                            285.303.677

   Investasi pada Ventura Bersama                                                                      Investment in Joint Ventures

   Rincian saldo investasi ventura bersama adalah sebagai                                              Details of investment in joint ventures are as
   berikut:                                                                                            follows:

                                                                                                       30 Juni/ June 30, 2023
                                                                                                                                  Setoran (Penarikan)/   Pengakuan Laba
                                                                                                                                  Koreksi/ Placement         (Rugi)/
                                                                                       Persentase/           Saldo Awal/             (Withdrawal)/         Gain (Loss)            Saldo Akhir/
                                                                                       Percentage         Beginning Balance           Correction           Recognition           Ending Balance
                                                        Proyek/ Project                    %                     Rp                        Rp                  Rp                      Rp
     Pihak Berelasi/ Related Parties
      WKR - RNI                        RNI Office Park                                    96%                  266.562.767.380                      --           48.522.694         266.611.290.074
      Brantas - Waskita                Bendungan Tapin                                    49%                   66.645.493.877                      --                    --         66.645.493.877
      Waskita - NK                     Jalan Batu Aji Kuaro                               60%                   38.473.287.580                      --                    --         38.473.287.580
      Waskita - Wika                   Jalan Tol Ciawi Sukabumi seksi 1                   51%                   17.964.836.939                      --                    --         17.964.836.939
      Waskita - Adhi                   Bendungan Margatiga                                65%                   16.635.139.914                      --        1.216.637.388          17.851.777.302
      Kresna Kusuma Dyandra Marga      Jalan Tol Bekasi Cawang Kampung Melayu             74%                  271.729.357.786                      --    (255.206.388.634)          16.522.969.152
      Waskita - Yodya Karya            Bandara Husein                                     99%                    7.849.919.710                      --                    --          7.849.919.710
      Waskita - Wika - PP - HK         Jatigede Sumedang                                  25%                    7.448.173.986                      --                    --          7.448.173.986
      Waskita - HK                     Sal Induk Sidorejo                                 51%                    7.348.709.249                      --                    --          7.348.709.249
      Waskita - PP                     Kamijoro                                           51%                    5.678.543.341                      --                    --          5.678.543.341
      Wika - Waskita - Nindya          Soker MYC                                          31%                    5.215.697.790                      --                    --          5.215.697.790
      Waskita - PP - Wika              Jembatan Merah Putih                               34%                    4.182.650.808                      --              607.828           4.183.258.636
      Waskita - Adhi                   Bendungan Way Sekampung (Paket 2)                  63%                    1.262.699.663                      --          826.012.420           2.088.712.083
      Waskita - Wika                   Irigasi Batang Sinamar                             60%                    1.691.371.060                      --                    --          1.691.371.060
      Waskita - Adhi                   Pengaman Pantai Jakarta Tahap 2 Paket 1            60%                    1.198.606.264                      --                    --          1.198.606.264
      Wika - Waskita                   RSUD Pasar Minggu                                  40%                      271.701.933                      --                    --            271.701.933
      Waskita - Nindya                 Kantor Kementerian Koordinator 3                   51%                                --                     --          170.618.686             170.618.686
      Waskita - Adhi                   Bendungan Leuwi Keris Paket 2                      70%                    2.596.649.439         (2.594.642.362)                    --              2.007.077
     Sub Jumlah/ Sub Total                                                                                     722.755.606.719         (2.594.642.362)    (252.943.989.618)         467.216.974.739




                                                                                 104
Page 108
                                                                                                               The original consolidated financial statements included herein are in
                                                                                                                                                          the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                                                   PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                                                             AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                                                         FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                                                AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                                                       MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                                                           (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                                                    (Expressed in full Rupiah amount, unless otherwise stated)

                                                                                                                30 Juni/ June 30, 2023
                                                                                                                                            Setoran (Penarikan)/    Pengakuan Laba
                                                                                                                                            Koreksi/ Placement          (Rugi)/
                                                                                                 Persentase/          Saldo Awal/              (Withdrawal)/          Gain (Loss)             Saldo Akhir/
                                                                                                 Percentage        Beginning Balance            Correction            Recognition            Ending Balance
                                                            Proyek/ Project                          %                    Rp                         Rp                   Rp                       Rp
    Pihak Ketiga/ Third Parties
     WKR - Darmo Permai                    Segi 88 Avenue                                           51%                  297.078.554.244                       --           1.512.799.450        298.591.353.694
     Waskita - Acset                       Jalanlayang Cikampek                                     51%                  285.235.466.002                       --              38.224.351        285.273.690.353
     Waskita - Triniti                     Alam Sutra                                               51%                  166.030.020.301                       --              24.385.921        166.054.406.222
     WKR - Sirius                          Yukata Suites                                            51%                  127.775.368.668                       --           (766.251.266)        127.009.117.402
     Waskita - Bahagia Bangun Nusa         Bendungan Temef (Paket 1)                                78%                  119.554.911.418                       --                       --       119.554.911.418
     Metallurgical - Wika - NK - Waskita   Jl Tol Cisumdawu Phase 2                                  8%                  109.581.243.263           1.965.713.887              156.393.576        111.703.350.726
     Waskita - Gorip Nanda Guna            Jl. Gempor Paket 2 Porong-Kejapan                        60%                   94.269.521.263         (3.250.000.000)                        --        91.019.521.263
     Dalawa - WKR                          Zallaka - Batu Tumpeng                                   41%                   65.390.707.789                       --                       --        65.390.707.789
     Waskita - JPC                         SMM Muara Teweh Div.Sipil                                68%                   53.230.724.936                       --                       --        53.230.724.936
     WKR - Permata Hijau                   WKR - Permata Hijau                                      51%                   42.926.919.852                       --                 817.416         42.927.737.268
     Daelim - Wika - Waskita               Karian Multipurpose Dam Project                          22%                   40.296.040.231                       --           1.790.214.767         42.086.254.998
     Waskita - Yasa                        Jl. Galing Aruk                                          100%                  38.918.539.425                       --                       --        38.918.539.425
     Waskita - Abdi Mulia Berkah           Sal Primer Jabung II                                     70%                   33.808.507.543                       --                       --        33.808.507.543
     Waskita - Arkonin                     Revitalisasi TPA Regional Sarbagita Suwing (MYC)         92%                   32.553.342.664                       --                       --        32.553.342.664
     Waskita - BRP                         Sedimentasi Bendungan Sumbawa                            65%                   18.228.928.625         (4.719.953.412)          18.560.205.180          32.069.180.393
     Waskita - Citra Mandiri               Jaringan Irigasi D.I Air Lakitan                         70%                   30.368.509.867                       --                       --        30.368.509.867
     Waskita - Bawakaraeng                 Irigasi D.I. Batang Alai                                 70%                   29.947.164.581                       --                       --        29.947.164.581
     Waskita - Guntur                      Tol IKN Tempadung-Pulau Balang                           50%                    1.488.791.675                       --         27.428.720.794          28.917.512.469
     Waskita - Jakon - Sagna               Bendungan Tiga Dihaji                                    57%                   26.200.114.917                       --           (604.857.357)         25.595.257.560
     Waskita - Penta                       Lansekap Bandara Soetta                                  98%                   15.893.747.018                       --                       --        15.893.747.018
     Waskita - Taruna Putra Pertiwi        Jaringan Irigasi D.I Colo (MYC)                          70%                   15.245.087.088                       --                       --        15.245.087.088
     Waskita - Gala Karya                  JDU SPAM Regional Durolis                                70%                   15.252.926.255         (4.011.917.666)                        --        11.241.008.589
     Waskita - Wika - PP - Jaya            Gd. Terminal 3                                           45%                    8.477.877.216                       --                       --         8.477.877.216
     Waskita - Wika - Shanghai             Jl Tol Cisumdawu Phase 1                                 10%                    6.476.285.760                       --                       --         6.476.285.760
     Waskita - Amarta                      Gedung GIK UGM                                           65%                       35.665.116                       --           4.750.287.513          4.785.952.629
     Waskita - Pijar                       Double Track Manggarai                                   65%                    5.211.844.294                       --           (560.591.748)          4.651.252.546
     Waskita - Riki Kencana                FO Sekip Ujung                                           65%                    9.455.741.654                       --         (5.143.134.242)          4.312.607.412
     Waskita - KMP                         Rekonstruksi Jalan Kwatisore - Kamp Muri                 70%                      972.834.968                       --           2.778.486.608          3.751.321.576
     Waskita - Matra                       Pembangunan PJUTS Wilayah 4                              90%                                --                      --           2.651.031.595          2.651.031.595
     Waskita - Adhi - Jaya                 Bayung Lencir - Tempino Seksi 1                          40%                                --            432.200.000                        --           432.200.000
     Waskita - Cempaka                     Bendung Baliase                                          55%                      341.026.402                       --                       --           341.026.402
     WKR - Ekatama                         Apartemen Pejaten                                        60%                      291.033.379                       --                       --           291.033.379
     Waskita - Sumber                      Pelabuhan SKPT Morotai                                   70%                                --                      --             150.657.757            150.657.757
     Waskita - Surya Bakti                 Jalan Pendekat Mahakam IV Sisi Samarinda Kota (MYC)      60%                      119.208.279                       --                       --           119.208.279
     KSO WKR - Vision First                JPM Dukuh Atas                                           92%                   25.107.814.975        (25.107.814.975)                        --                     --
     Waskita - PAL                         PLTU 2X3 MW Malinau                                      100%                               --          2.021.111.667          (2.021.111.667)                      --
     Waskita - Nindya - Modern             Jalan IKN Sepaku Segmen 4                                70%                                --          3.287.138.117          (3.287.138.117)                      --
     Waskita - Bersinar                    Pembangunan IPAL 1,2,3 IKN                               70%                                --          6.634.084.724          (6.634.084.724)                      --
     Waskita - Rinenggo - Antaraksa        Proyek Bangunan Stasiun Medan                            40%                                --          1.860.009.770          (1.860.009.770)
    Sub Jumlah/ Sub Total                                                                                              1.715.764.469.668        (20.889.427.889)          38.965.046.038        1.733.840.087.817
    Jumlah/ Total                                                                                                      2.438.520.076.387        (23.484.070.251)        (213.978.943.580)       2.201.057.062.556


                                                                                                            31 Desember/ December 31, 2022
                                                                                                                                         Setoran (Penarikan)/             Pengakuan Laba
                                                                                                                                         Koreksi/ Placement                   (Rugi)/
                                                                                                   Persentase/         Saldo Awal/          (Withdrawal)/                   Gain (Loss)            Saldo Akhir/
                                                                                                   Percentage       Beginning Balance        Correction                     Recognition           Ending Balance
                                                             Proyek/ Project                           %                   Rp                     Rp                            Rp                      Rp
    Pihak Berelasi/ Related Parties
     Kresna Kusuma Dyandra Marga            Jalan Tol Bekasi Cawang Kampung Melayu                     74%                  668.186.925.855          52.872.587.893        (449.330.155.962)         271.729.357.786
     WKR - RNI                              RNI Office Park                                            96%                  261.531.303.315            3.668.010.959           1.363.453.106         266.562.767.380
     Brantas - Waskita                      Bendungan Tapin                                            49%                   67.487.640.293                        --          (842.146.416)          66.645.493.877
     Waskita - NK                           Jalan Batu Aji Kuaro                                       60%                   38.473.287.580                        --                      --         38.473.287.580
     Waskita - Wika                         Jalan Tol Ciawi Sukabumi seksi 1                           51%                   17.964.649.354                  187.585                       --         17.964.836.939
     Waskita - Adhi                         Bendungan Margatiga                                        65%                   19.811.651.809          (3.250.000.000)              73.488.105          16.635.139.914
     Waskita - Yodya Karya                  Bandara Husein                                             99%                    7.849.919.710                        --                      --          7.849.919.710
     Waskita - Wika - PP - HK               Jatigede Sumedang                                          25%                    7.448.173.986                        --                      --          7.448.173.986
     Waskita - HK                           Sal Induk Sidorejo                                         51%                    7.348.709.249                        --                      --          7.348.709.249
     Waskita - PP                           Kamijoro                                                   51%                    5.678.543.341                        --                      --          5.678.543.341
     Wika - Waskita - Nindya                Soker MYC                                                  31%                    4.182.838.393            1.032.859.397                       --          5.215.697.790
     Waskita - PP - Wika                    Jembatan Merah Putih                                       34%                    5.215.697.790          (1.033.046.982)                       --          4.182.650.808
     Waskita - Adhi                         Bendungan Leuwi Keris Paket 2                              70%                    5.089.333.653          (6.242.123.526)           3.749.439.312           2.596.649.439
     Waskita - Wika                         Irigasi Batang Sinamar                                     60%                    1.691.371.060                        --                      --          1.691.371.060
     Waskita - Adhi                         Bendungan Way Sekampung (Paket 2)                          63%                    8.423.784.001          (6.542.329.783)           (618.754.555)           1.262.699.663
     Waskita - Adhi                         Pengaman Pantai Jakarta Tahap 2 Paket 1                    60%                    1.198.606.264                        --                      --          1.198.606.264
     Wika - Waskita                         RSUD Pasar Minggu                                          40%                      271.701.933                        --                      --            271.701.933
     HK - Waskita                           Manado - Bitung (Air Madidi)                               45%                           29.999                  (29.999)                      --                      --
     Waskita - HK - BRP                     Leuwi Keris Paket 4                                        43%                      595.000.000            (595.000.000)                       --                      --
    Sub Jumlah/ Sub Total                                                                                                 1.128.449.167.585          39.911.115.544        (445.604.676.410)         722.755.606.719




                                                                                          105
Page 109
                                                                                                            The original consolidated financial statements included herein are in
                                                                                                                                                       the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                                                  PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                                                            AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                                                        FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                                               AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                                                      MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                                                          (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                                                   (Expressed in full Rupiah amount, unless otherwise stated)

                                                                                                          31 Desember/ December 31, 2022
                                                                                                                                       Setoran (Penarikan)/     Pengakuan Laba
                                                                                                                                       Koreksi/ Placement           (Rugi)/
                                                                                                 Persentase/         Saldo Awal/          (Withdrawal)/           Gain (Loss)         Saldo Akhir/
                                                                                                 Percentage       Beginning Balance        Correction             Recognition        Ending Balance
                                                            Proyek/ Project                          %                   Rp                     Rp                    Rp                   Rp
    Pihak Ketiga/ Third Parties
     WKR - Darmo Permai                    Segi 88 Avenue                                          51%                 298.621.559.182      (9.303.458.333)         7.760.453.395      297.078.554.244
     Waskita - Acset                       Jalanlayang Cikampek                                    51%                 272.985.319.025       12.149.992.505           100.154.472      285.235.466.002
     Waskita - Triniti                     Alam Sutra                                              51%                 165.856.965.215                     --         173.055.086      166.030.020.301
     WKR - Sirius                          Yukata Suites                                           51%                 131.219.195.305      (1.123.238.245)       (2.320.588.392)      127.775.368.668
     Waskita - Bahagia Bangun Nusa         Bendungan Temef (Paket 1)                               78%                 100.627.312.747                     --      18.927.598.671      119.554.911.418
     Metallurgical - Wika - NK - Waskita   Jl Tol Cisumdawu Phase 2                                 8%                  81.018.606.176      (1.635.466.496)        30.198.103.583      109.581.243.263
     Waskita - Gorip Nanda Guna            Jl. Gempor Paket 2 Porong-Kejapan                       60%                  94.269.521.263                     --                   --      94.269.521.263
     Dalawa - WKR                          Zallaka - Batu Tumpeng                                  41%                  64.545.360.861          845.346.928                     --      65.390.707.789
     Waskita - JPC                         SMM Muara Teweh Div.Sipil                               68%                 103.606.186.795     (50.375.461.859)                     --      53.230.724.936
     WKR - Permata Hijau                   WKR - Permata Hijau                                     51%                  50.834.456.365      (7.951.297.878)            43.761.365       42.926.919.852
     Daelim - Wika - Waskita               Karian Multipurpose Dam Project                         22%                  31.930.821.565                     --       8.365.218.666       40.296.040.231
     Waskita - Yasa                        Jl. Galing Aruk                                         100%                 39.303.948.460                     --       (385.409.035)       38.918.539.425
     Waskita - Abdi Mulia Berkah           Sal Primer Jabung II                                    70%                  33.808.507.543                     --                   --      33.808.507.543
     Waskita - Arkonin                     Revitalisasi TPA Regional Sarbagita Suwing (MYC)        92%                  32.553.342.664                     --                   --      32.553.342.664
     Waskita - Citra Mandiri               Jaringan Irigasi D.I Air Lakitan                        70%                  30.368.509.867                     --                   --      30.368.509.867
     Waskita - Bawakaraeng                 Irigasi D.I. Batang Alai                                70%                  29.947.164.581                     --                   --      29.947.164.581
     Waskita - Jakon - Sagna               Bendungan Tiga Dihaji                                   57%                  29.466.336.535                     --     (3.266.221.618)       26.200.114.917
     KSO WKR - Vision First                JPM Dukuh Atas                                          92%                   5.192.000.000       19.915.941.860             (126.885)       25.107.814.975
     Waskita - BRP                         Sedimentasi Bendungan Sumbawa                           65%                               --       4.277.000.000        13.951.928.625       18.228.928.625
     Waskita - Penta                       Lansekap Bandara Soetta                                 98%                  15.893.747.018                     --                   --      15.893.747.018
     Waskita - Gala Karya                  JDU SPAM Regional Durolis                               70%                  25.752.926.255     (10.500.000.000)                     --      15.252.926.255
     Waskita - Taruna Putra Pertiwi        Jaringan Irigasi D.I Colo (MYC)                         70%                  15.245.087.088                     --                   --      15.245.087.088
     Waskita - Riki Kencana                FO Sekip Ujung                                          65%                               --                    --       9.455.741.654        9.455.741.654
     Waskita - Wika - PP - Jaya            Gd. Terminal 3                                          45%                   8.477.877.216                     --                   --       8.477.877.216
     Waskita - Wika - Shanghai             Jl Tol Cisumdawu Phase 1                                10%                   3.614.891.032        2.861.394.728                     --       6.476.285.760
     Waskita - Pijar                       Double Track Manggarai                                  65%                   4.414.768.178             2.000.000          795.076.116        5.211.844.294
     Waskita - Guntur                      Tol IKN Tempadung-Pulau Balang                          50%                               --                    --       1.488.791.675        1.488.791.675
     Waskita - KMP                         Rekonstruksi Jalan Kwatisore - Kamp Muri                70%                               --                    --         972.834.968          972.834.968
     Waskita - Cempaka                     Bendung Baliase                                         55%                     341.026.402                     --                   --         341.026.402
     WKR - Ekatama                         Apartemen Pejaten                                       60%                     291.033.379                     --                   --         291.033.379
     Waskita - Surya Bakti                 Jalan Pendekat Mahakam IV Sisi Samarinda Kota (MYC)     60%                     119.208.279                     --                   --         119.208.279
     Waskita - Amarta                      Gedung GIK UGM                                          65%                               --                    --          35.665.116           35.665.116
     Waskita - PAL                         PLTU 2X3 MW Malinau                                     100%                 46.070.456.488     (24.083.874.618)      (21.986.581.870)                    --
     Waskita - Nindya - Modern             Jalan IKN Sepaku Segmen 4                               70%                               --       2.423.396.345       (2.423.396.345)                    --
     Waskita - Rinenggo - Antaraksa        Proyek Bangunan Stasiun Medan                           40%                               --       2.632.573.066       (2.632.573.066)                    --
     WKR - Asiana                          Two Senopati                                            51%                       4.598.428           (4.598.428)                    --                   --
    Sub Jumlah/ Sub Total                                                                                            1.716.380.733.912     (59.869.750.425)        59.253.486.181    1.715.764.469.668
    Jumlah/ Total                                                                                                    2.844.829.901.497     (19.958.634.881)     (386.351.190.229)    2.438.520.076.387



   PT Kresna Kusuma Dyandra Marga (KKDM) – (WTR –                                                              PT Kresna Kusuma Dyandra Marga (KKDM) –
   RDPT)                                                                                                       (WTR – RDPT)

   Pendirian KKDM (kepemilikan tidak langsung melalui                                                         The estabilishment of KKDM (indirect ownership
   WTR) adalah sesuai Akta Pendirian dari Notaris Mudofir                                                     through WTR) was based on notarial deed
   Hadi S.H, No. 94 tanggal 20 Desember 1996. WTR                                                             No. 94 dated December 20, 1996 of notary Mudofir
   memiliki penyertaan 60% dari modal disetor KKDM.                                                           Hadi, S.H. WTR owns 60% of paid up capital of
                                                                                                              KKDM.

   Berdasarkan akta notaris tanggal 8 Juni 2017 dari notaris                                                  Based on notarial deed No. 25 dated June 8, 2017
   Jose Dima Satria, S.H., M.Kn. No. 25, WTR membeli                                                          of notary Jose Dima Satria, S.H., M.Kn., WTR
   kepemilikan minoritas pada saham KKDM senilai                                                              purchased a minority interest in KKDM amounting
   Rp525.000.000.000 atau setara dengan 38,97%,                                                               to Rp525,000,000,000 or equivalent to 38.97%,
   sehingga kepemilikan WTR menjadi 98,97%.                                                                   bringing the ownership of WTR to 98.97%.

   Berdasarkan   akta    notaris   No.     17    tanggal                                                      Based on notarial deed No. 17 dated December 20,
   20 Desember 2017 dari notaris Ariani L. Rachim, S.H.,                                                      2017 by notary Ariani L. Rachim, S.H., WTR bought
   WTR membeli penerbitan saham KKDM sebesar 0,57%                                                            0.57% of KKDM shares bringing WTR’s ownership
   sehingga kepemilikan WTR atas KKDM menjadi 99,54%.                                                         in KKDM to 99.54%.

   Berdasarkan     akta   notaris   No.    3    tanggal                                                       Based on notarial deed No. 3 dated February 9,
   9 Februari 2018 dari notaris Ariani L. Rachim, S.H.,                                                       2018 of notary Ariani L. Rachim, S.H., regarding
   perihal Keputusan Sirkular Rapat Umum Pemegang                                                             the Circular Resolution of General Meeting of
   Saham (RUPS) tanggal 24 Januari 2018, WTR                                                                  Shareholders (GMS) dated January 24, 2018, WTR
   menambah      penyertaan   pada     KKDM    sebesar                                                        increased its ownership in KKDM amounting to
   Rp73.476.879.000.                                                                                          Rp73,476,879,000.




                                                                                          106
Page 110
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

   Berdasarkan akta notaris No. 4 tanggal 5 Juni 2018 dari           Based on notarial deed No. 4 dated June 5, 2018 of
   notaris Ariani L. Rachim, S.H., WTR menambah                      notary Ariani L. Rachim, S.H., WTR increased its
   penyertaan pada KKDM sebesar Rp49.124.000.000,                    ownership      in    KKDM        amounting      to
   sehingga kepemilikan WTR menjadi 99,64%, yang telah               Rp49,124,000,000, bringing the ownership of WTR
   disetujui oleh Menteri Hukum dan Hak Asasi Manusia                to 99.64%, which has been approved by
   dengan Surat Keputusan No. AHU-AH.01.03-0216005                   the Minister of Law and Human Rights through
   tanggal 26 Juni 2018.                                             Decision Letter No. AHU-AH.01.03-0216005 dated
                                                                     June 26, 2018.

   Berdasarkan Akta Notaris No. 40 tanggal 11 Oktober                Based on Notarial Deed No. 40 dated October 11,
   2018 dari Notaris Ariani L. Rachim, S.H., Perusahaan              2018 of Notary Ariani L. Rachim, S.H.,
   menambah     penyertaan      pada   KKDM     sebesar              the Company increased its ownership in KKDM
   Rp110.428.000.000, sehingga kepemilikan Perusahaan                amounting to Rp110,428,000,000, bringing
   menjadi 99,70%, yang telah disetujui oleh Menteri                 the ownership of the Company to 99.70%, which
   Hukum     dan     Hak     Asasi   Manusia     dengan              has been approved by the Minister of Law
   Surat Keputusan No. AHU-AH.01.03-0254272 tanggal                  and Human Rights in his Decision Letter
   18 Oktober 2018.                                                  No. AHU-AH.01.03-0254272 dated October 18,
                                                                     2018.

   Berdasarkan Akta Notaris No. 37 tanggal 18 November               Based on Notarial Deed No. 37 dated
   2020 oleh Ir. Nanette Cahyanie Handari Adi Warsito,               November 18, 2020 by Ir. Nanette Cahyanie
   S.H., WTR menjual 30% kepemilikan saham di KKDM                   Handari Adi Warsito, S.H., WTR sold its 30%
   kepada      RDPT       dengan      harga     sebesar              ownership KKDM to Limited Investment Fund
   Rp550.000.000.000. Perusahaan mengakui keuntungan                 (RDPT) at a price of Rp550,000,000,000.
   dari penjualan tersebut sebesar Rp104.611.720.601                 The Company’s gain on sale amounting to
   sebagai penghasilan lainnya. Kepemilikan saham WTR                Rp104,611,720,601 which was recorded as other
   di KKDM menjadi sebesar 70% setelah penjualan                     income. WTR share ownership in KKDM becomes
   tersebut.                                                         70% after the sale of shares transaction.

   Pemegang saham sepakat bahwa pengelolaan KKDM                     Shareholders agree that the management of KKDM
   dikelola secara bersama oleh RDPT dan WTR sesuai                  managed jointly by RDPT and WTR in accordance
   dengan Perubahan Pertama atas Perjanjian antar                    with      the      First      Amendment      on
   Pemegang Saham PT Kresna Kusuma Dyandra Marga                     the Agreement between the shareholders
   tanggal 17 November 2020. Berdasarkan kesepakatan                 of PT Kresna Kusuma Dyandra Marga on
   bahwa KKDM dikelola bersama, maka WTR tidak                       November 17, 2020. Based on the agreement that
   melakukan konsolidasi terhadap laporan keuangan                   KKDM is jointly managed, WTR does not
   KKDM.                                                             consolidate KKDM's financial statements.

   Berdasarkan Akta Jual Beli Saham No. 39 dari Notaris              Based on the Deed of Sale and Purchase of Shares
   Insinyur Nanette Cahyanie Handari Adi Warsito tanggal             No. 39 from Notary Engineer Nanette Cahyanie
   18 November 2021. Berdasarkan Akta Jual beli saham                Handari Adi Warsito dated November 18, 2021.
   tersebut, WTR memiliki opsi beli atas saham                       Based on the Deed of Sale and Purchase of shares,
   KKDM yang dimiliki oleh Reksa Dana Penyertaan                     WTR has a purchase option on KKDM shares
   Terbatas Ekuitas Danareksa Toll Road (RDPT EDTR).                 owned by the Danareksa Toll Road Equity Limited
   Pelaksanaan opsi beli tahun I sebanyak 53.785.872                 Participation Mutual Fund (RDPT EDTR). The
   lembar saham atau 2,1% saham kepemilikan RDPT                     exercise of the buy option in the first year was
   EDTR       dengan     nilai    transaksi     sebesar              53,785,872 shares or 2.1% of the shares owned by
   Rp47.391.269.678.                                                 RDPT EDTR with a transaction value of
                                                                     Rp47,391,269,678.

   Berdasarkan Akta Jual Beli Saham No. 21 dari Notaris              Based on the Deed of Sale and Purchase of Shares
   Insinyur Nanette Cahyanie Handari Adi Warsito tanggal             No. 21 from Notary Engineer Nanette Cahyanie
   17 November 2022. Berdasarkan Akta Jual beli saham                Handari Adi Warsito dated November 17, 2022.
   tersebut, WTR memiliki opsi beli atas saham KKDM yang             Based on the Deed of Sale and Purchase of shares,
   dimiliki oleh Reksa Dana Penyertaan Terbatas Ekuitas              WTR has a purchase option on KKDM shares
   Danareksa Toll Road (RDPT EDTR). Pelaksanaan opsi                 owned by the Danareksa Toll Road Equity Limited
   beli tahun II sebanyak 53.785.872 lembar saham atau               Participation Mutual Fund (RDPT EDTR). The
   2,1% saham kepemilikan RDPT EDTR dengan nilai                     exercise of the buy option in the first year was
   transaksi sebesar Rp52.872.587.893.                               53,785,872 shares or 2.1% of the shares owned by
                                                                     RDPT EDTR with a transaction value of
                                                                     Rp52,872,587,893.

                                                          107
Page 111
                                                                          The original consolidated financial statements included herein are in
                                                                                                                     the Indonesian language.


 PT WASKITA KARYA (PERSERO) TBK                                                  PT WASKITA KARYA (PERSERO) TBK
 DAN ENTITAS ANAK                                                                            AND ITS SUBSIDIARIES
 CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
 KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                        FINANCIAL STATEMENTS AS OF JUNE 30, 2023
 31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                               AND DECEMBER 31, 2022 AND FOR THE SIX
 ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                      MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
 (2022 – DIAUDIT) – Lanjutan                                                          (2022 – AUDITED) – Continued
 (Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)               (Expressed in full Rupiah amount, unless otherwise stated)

    Operasi bersama                                                         Joint Operation

    Perusahaan mempunyai 15% bagian dalam Perjanjian                        The Company has a 15% share in the Consortium
    Pembentukan Konsorsium dalam Rangka Pelaksanaan                         Agreement for the Construction of Multipurpose
    Pekerjaan Pembangunan Terminal Multipurpose dan                         Port and Support Facilities at the Port of Kuala
    Fasilitas Pendukung di Pelabuhan Kuala Tanjung                          Tanjung      in    North   Sumatera      Province.
    di Propinsi Sumatera Utara. Perusahaan berhak atas                      The Company is entitled to a proportionate share of
    proporsi bagian dari penghasilan dan dikenakan proporsi                 the income and bears a proportionate share of the
    bagian dari biaya operasi bersama.                                      joint operating expenses.

    Perusahaan mempunyai bagian dalam perjanjian                            The Company have shares in the joint operation for
    pelaksanaan pekerjaan pembangunan Jalan Tol Jakarta                     the construction work of Jakarta Cikampek II Toll
    Cikampek II Elevated ruas Cikunir s.d Karawang Barat sta                Road Elevated Cikunir to West Karawang
    9+500 - sta 28+480.(Catatan 57)                                         sta 9 + 500 - sta 28 + 480.(Note 57)

14. PROPERTI INVESTASI                                                14. INVESTMENT PROPERTIES

                                                    30 Juni/           31 Desember/
                                                  June 30, 2023      December 31, 2022
                                                       Rp                   Rp
    Harga Perolehan                                                                                                            Acquisition Cost
     Tanah                                          72.307.454.963       72.307.454.963                                                  Land
     Bangunan                                      219.315.019.119      219.315.019.119                                               Building
    Jumlah Harga Perolehan                         291.622.474.082      291.622.474.082                                 Total Acquisition Cost

    Nilai Wajar                                                                                                                      Fair Value
     Tanah                                          86.682.474.975       86.682.474.975                                                   Land
     Bangunan                                      230.857.959.538      230.857.959.538                                               Building
    Total Nilai Wajar                              317.540.434.513      317.540.434.513                                        Total Fair Value
    Jumlah Properti Investasi                      317.540.434.513      317.540.434.513                            Total Investment Properties


    Properti   investasi  merupakan    proyek    gedung                    Investment properties consist of office building and
    perkantoran dan hotel Cawang, yang berlokasi di Jalan                  Cawang hotel project, located in Jalan MT Haryono
    MT Haryono Cawang, dengan luas lahan sebesar 3.650                     Cawang, lying on a land area of 3,650 m2.
    m 2.

    Pada tanggal 30 Juni 2023 dan 31 Desember 2022 nilai                   As of June 30, 2023 and December 31, 2022, the fair
    wajar properti investasi adalah masing-masing sebesar                  value of the investment properties amounting to
    Rp317.540.434.513.                                                     Rp317,540,434,513.

15. INVESTASI JANGKA PANJANG LAINNYA                                  15. OTHER LONG-TERM INVESTMENTS

                                                                                            30 Juni/                   31 Desember/
                                                                                          June 30, 2023              December 31, 2022
                                                                                               Rp                           Rp

   PT Citra Waspphutowa                                                                      328.859.297.616              328.859.297.616
   PT Prima Multi Terminal                                                                   302.622.000.000              302.622.000.000
   PT Citra Karya Jabar Tol                                                                  131.250.000.000              131.250.000.000
   PT Hutama Marga Waskita                                                                    79.402.869.204               79.402.869.204
   PT PP Sinergi Banjaratma                                                                   12.684.923.000               12.684.923.000
   PT Jasamarga Jogja Bawen                                                                   13.500.000.000               13.500.000.000
   PT Jasamarga Gedebage Cilacap                                                               1.219.100.000                1.219.100.000
   PT Jasamarga Probolinggo Banyuwangi                                                           200.000.000                  200.000.000
   Jumlah/ Total                                                                             869.738.189.820              869.738.189.820




                                                            108
Page 112
                                                                                    The original consolidated financial statements included herein are in
                                                                                                                               the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                           PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                                     AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                       NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                                 FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                        AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                               MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                                   (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                          (Expressed in full Rupiah amount, unless otherwise stated)

   Rincian mutasi investasi jangka panjang lainnya sebagai                           The details of movement in other long-term
   berikut:                                                                          investments are as follows:

                                                                                      30 Juni/ June 30, 2023
                                         Persentase
                                        Kepemilikan/                                  Penambahan
                                        Percentage of       Saldo Awal/              (Pengurangan)/             Reklasifikasi/          Saldo Akhir/
                                         Ownership       Beginning Balance         Addition (Deduction)        Reclassification        Ending Balance
                                             %                  Rp                          Rp                       Rp                      Rp

  PT Citra Waspphutowa                           13,47        328.859.297.616                             --                      --      328.859.297.616
  PT Prima Multi Terminal                         1,01        302.622.000.000                             --                      --      302.622.000.000
  PT Citra Karya Jabar Tol                       15,00        131.250.000.000                             --                      --      131.250.000.000
  PT Hutama Marga Waskita                         0,63         79.402.869.204                             --                      --       79.402.869.204
  PT PP Sinergi Banjaratma                       20,00         12.684.923.000                             --                      --       12.684.923.000
  PT Jasamarga Jogja Bawen                       12,50         13.500.000.000                             --                      --       13.500.000.000
  PT Jasamarga Gedebage Cilacap                  20,00          1.219.100.000                             --                      --        1.219.100.000
  PT Jasamarga Probolinggo Banyuwangi             0,15            200.000.000                             --                      --          200.000.000
  Jumlah/ Total                                               869.738.189.820                             --                      --      869.738.189.820


                                                                                 31 Desember/ December 31, 2022
                                         Persentase
                                        Kepemilikan/                                  Penambahan
                                        Percentage of       Saldo Awal/              (Pengurangan)/             Reklasifikasi/          Saldo Akhir/
                                         Ownership       Beginning Balance         Addition (Deduction)        Reclassification        Ending Balance
                                             %                  Rp                          Rp                       Rp                      Rp
  PT Citra Waspphutowa                           13,47        328.859.297.616                           --                        --      328.859.297.616
  PT Prima Multi Terminal                         1,01        302.622.000.000                           --                        --      302.622.000.000
  PT Citra Karya Jabar Tol                       15,00        131.250.000.000                           --                        --      131.250.000.000
  PT Hutama Marga Waskita                         0,63         79.402.869.204                           --                        --       79.402.869.204
  PT PP Sinergi Banjaratma                       20,00         12.684.923.000                           --                        --       12.684.923.000
  PT Jasamarga Jogja Bawen                       12,50         13.500.000.000                           --                        --       13.500.000.000
  PT Jasamarga Gedebage Cilacap                  20,00                      --              1.219.100.000                         --        1.219.100.000
  PT Jasamarga Probolinggo Banyuwangi             0,15            200.000.000                           --                        --          200.000.000
  Jumlah/ Total                                               868.519.089.820               1.219.100.000                         --      869.738.189.820


   PT Citra Waspphutowa (CW)                                                         PT Citra Waspphutowa (CW)

   WTR memiliki penyertaan sebesar 12,5% dari                                        WTR has a participation of 12.5% of the paid-in
   modal PT Citra Waspphutowa atau sebesar                                           capital of PT Citra Waspphutowa amounting to
   Rp125.000.000.000. PT Citra Waspphutowa didirikan                                 Rp125,000,000,000. PT Citra Waspphutowa was
   sesuai Akta Pendirian No.10 dari Notaris Drs. Soegeng                             established based on Notarial Deed No.10 by
   Santosa, S.H., M.H., tanggal 13 Januari 2006, bergerak                            Drs. Soegeng Santosa, S.H., M.H., dated
   di bidang pengusahaan jalan tol.                                                  January 13, 2006 and is engaged in toll road
                                                                                     actvities.

   Pada tanggal 5 April 2017 sesuai dengan Akta No. 13 dari                          On April 5, 2017, based on Notarial Deed
   Notaris Irma Devita Purnamasari, S.H., M.Kn., WTR                                 No. 13 by Irma Devita Purnamasari, S.H., M.Kn.,
   membeli saham PT Citra Waspphutowa yang dimiliki oleh                             WTR bought the shares of PT Citra Waspphutowa
   PT     Waskita   Karya      (Persero)   Tbk    sebesar                            owned by PT Waskita Karya (Persero) Tbk
   Rp132.000.000.000 dengan disagio saham sebesar                                    amounting to Rp132,000,000,000 with a share
   Rp63.467.953.607 sehingga kepemilikan WTR menjadi                                 disagio of Rp63,467,953,607. This increased WTR’s
   25%.                                                                              participation to 25%.

   WTR menambah penyertaan pada PT Citra                                             WTR increased its investment in PT Citra
   Waspphutowa berdasarkan Akta No. 95 dari Notaris                                  Waspphutowa based on notarial deed No. 95 by
   Justriany Koni S.H., tanggal 28 Mei 2019 pada sebesar                             Justriany Koni S.H dated May 28, 2019 amounting
   Rp61.000.000.000.                                                                 to Rp61,000,000,000.

   WTR menambah penyertaan pada PT Citra                                             WTR increased its investment in PT Citra
   Waspphutowa berdasarkan Akta No. 04 dari Notaris                                  Waspphutowa based on notarial deed No. 04 by
   Dewantari Handayani S.H, MPA., tanggal 28 Februari                                Dewantari Handayani S.H, MPA dated February 28,
   2020 sebesar Rp80.750.000.000.                                                    2020 amounting to Rp80,750,000,000.




                                                                  109
Page 113
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

   Berdasarkan Surat No. D/73.3/WTR-DU/1220 tanggal                 Based on letter No. D/73.3/WTR-DU/1220 dated
   8 Desember 2020, WTR tidak setuju atas penambahan                December 8, 2020, WTR disagreed to additional
   modal ditempatkan dan disetor PT Citra Washpphutowa              paid-in capital in PT Citra Washpphutowa amounting
   sebesar Rp793.000.0000.000, sehingga kepemillikan                to Rp793,000,000,000, therefore WTR participation
   WTR menjadi 18,2% dan pada tanggal 31 Desember                   became 18.2% and on December 31, 2020, this
   2020, entitas asosiasi ini direklasifikasi dari investasi        associate was reclassified from investment in
   entitas asosiasi menjadi investasi jangka panjang lainnya.       associate to other long-term investment.

   Berdasarkan akta No. 24 tanggal 13 Oktober 2022 dari             Based on deed No. 24 dated October 13, 2022 by
   Notaris Herdimansyah Chaidirsyah, S.H., perihal                  Notary Herdimansyah Chaidirsyah, S.H., regarding
   tambahan modal ditempatkan dan disetor PT Citra                  the additional issued and paid-up capital of
   Waspphutowa. WTR tidak melakukan setoran modal                   PT Citra Waspphutowa, WTR did not make capital
   kepada PT Citra Waspphutowa, sebagai akibat hal                  injections to PT Citra Waspphutowa, as a result of
   tersebut kepemilikan saham WTR terdilusi menjadi                 this, WTR share ownership was diluted to 13.47%
   sebesar 13,47%.                                                  .

   PT Prima Multi Terminal (PMT)                                    PT Prima Multi Terminal (PMT)

   Perusahaan memiliki penyertaan sebesar 20% pada PMT              The Company has 20% investment in PMT or
   atau setara Rp26.100.000.000. Perusahaan ini didirikan           equivalent to Rp26,100,000,000. PMT was
   sesuai Akta Pendirian No. 4 tanggal 26 September 2014            established under Notarial deed of Establishment
   dari Notaris Tuti Sumarni, S.H., M.H., bergerak di bidang        No. 4 dated September 26, 2014 of Notary Tuti
   perdagangan dan jasa.                                            Sumarni, S.H., M.H., and is engaged in trading and
                                                                    services.

   Berdasarkan Akta No. 6 tanggal 16 Desember 2015 dari             Based on Notarial deed No. 6 dated December 16,
   notaris Tuti Sumarni, S.H., M.H., PT Pembangunan                 2015 of notary Tuti Sumarni, S.H., M.H.,
   Perumahan Tbk melakukan penjualan sebagian saham                 PT Pembangunan Perumahan Tbk sold some of its
   sebesar Rp9.150.000.000 yang dimiliki di dalam PMT               own shares in PMT amounting to Rp9,150,000,000
   atau sebanyak 5%.                                                or equivalent to 5%.

   Pada tanggal 14 Desember 2017, Perusahaan                        On December 14, 2017, the Company increased its
   menambah       penyertaan        di   PMT        sebesar         investment in PMT amounting to Rp60,000,000,000.
   Rp60.000.000.000. Kepemilikan Perusahaan menjadi                 The Company’s ownership became 20% according
   sebesar 20%, berdasarkan akta notaris No. 9 tanggal              to notarial deed No. 9 dated February 23, 2018 of
   23 Februari 2018 dari notaris Risna Rahmi Arifa, S.H.            notary Risna Rahmi Arifa, S.H.

   Pada Desember 2018, Perusahaan menambah                          In     December         2018,   the    Company
   penyertaan di PMT sebesar Rp30.000.000.000.                      increased its investments in PMT amounting to
   Kepemilikan Perusahaan menjadi sebesar 20%,                      Rp30,000,000,000. The Company’s ownership
   berdasarkan akta notaris No. 13 tanggal 18 Maret 2019            became 20% according to notarial deed No. 13
   dari notaris Risna Rahmi Arifa, S.H. Manajemen                   dated March 18, 2019 of notary Risna Rahmi Arifa,
   berpendapat penyertaan di PMT belum memiliki                     S.H. The management has assessed that the
   pengaruh signifikan sampai dengan tanggal pelaporan.             ownership in PMT does not have significant
                                                                    influence up to reporting date.

   Berdasarkan Akta No. 18 tanggal 24 Oktober 2022 oleh             Based on Notarial deed No. 18 dated October 24,
   notaris Nanda Fauzan Iwan, PMT meningkatkan modal                2022 by notary Nanda Fauzan Iwan, PMT increased
   disetor dan ditempatkan yang seluruhnya diambil bagian           the paid-in and issued capital which was entirely
   oleh Pelindo dengan cara konversi pinjaman pemegang              paid up by Pelindo by converting a shareholder loan
   saham sebesar Rp466.878.000.000 dan penyetoran                   amounting to Rp466,878,000,000 and paid-in capital
   modal tunai sebesar Rp2.750.123.049.346. Kepemilikan             in cash amounting to Rp2,750,123,049,346.
   Perusahaan di PMT menjadi 1,01%.                                 Company’s ownership in PMT became 1.01%.




                                                          110
Page 114
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

   PT Citra Karya Jabar Tol (CKJT)                                  PT Citra Karya Jabar Tol (CKJT)

   WTR memiliki penyertaan sebesar 15% dari modal CKJT              WTR has 15% investment in CKJT’s paid-in capital
   atau setara dengan Rp15.000.000.000. CKJT didirikan              or equivalent to Rp15,000,000,000. CKJT was
   sesuai Akta Pendirian No. 18 tanggal 30 Januari 2017 dari        established based on the notarial deed No. 18 dated
   notaris Dessi, S.H., M.Kn., bergerak di bidang                   January 30, 2017 by notary Dessi, S.H., M.Kn. and
   pengusahaan jalan tol.                                           engaged in toll road concession.

   WTR menambah penyertaan pada CKJT sebesar                        WTR increased its investment in CKJT amounting to
   Rp30.000.000.000 pada tanggal 1 November 2018.                   Rp30,000,000,000 on November 1, 2018.

   WTR menambah penyertaan pada CKJT sebesar                        WTR increased its investment in CKJT amounting to
   Rp86.250.000.000 berdasarkan Keputusan Sirkuler di               Rp86,250,000,000 based on the decree of the
   luar RUPS pada tanggal 13 September 2019.                        Circular outside of GMS dated September 13, 2019.

  PT PP Sinergi Banjaratma                                          PT PP Sinergi Banjaratma

   Perusahaan memiliki penyertaan sebesar 20% pada                  The     Company has       20%     investment   in
   PT PP Sinergi Banjaratma atau setara dengan                      PT PP Sinergi Banjaratma or equivalent to
   Rp12.684.923.000. PT PP Sinergi Banjartama didirikan             Rp12,684,923,000. PT PP Sinergi Banjartama was
   sesuai Akta Pendirian No. 2 tanggal 7 Februari 2019 dari         established under Notarial deed of Establishment
   Notaris Ni Nyoman Rai Sumawati, S.H., M.Kn.                      No. 2 dated February 7, 2019 of Notary Ni Nyoman
                                                                    Rai Sumawati, S.H., M.Kn.

   PT Jasamarga Jogja Bawen                                         PT Jasamarga Jogja Bawen

   Perusahaan memiliki penyertaan sebesar 12,50% pada               The Company has 12.50% investments in
   PT Jasamarga Jogja Bawen atau setara dengan                      PT Jasamarga Jogja Bawen or equivalent to
   Rp4.625.000.000. PT Jasamarga Jogja Bawen didirikan              Rp4,625,000,000. PT Jasamarga Jogja Bawen was
   sesuai Akta Pendirian No. 11 tanggal 11 November 2020            established under Notarial deed of Establishment
   dari Notaris Ni Nyoman Rai Sumawati, S.H., M.Kn.                 No. 11 dated November 11, 2020 of Notary Ni
                                                                    Nyoman Rai Sumawati, S.H., M.Kn.

   Berdasarkan keputusan Para Pemegang Saham di Luar                Based on the decision of the Shareholders outside
   Rapat Umum Pemegan Saham yang ditandatangani                     the General Meeting of Shareholders signed on
   pada 29 September 2021, Perusahaan menambah                      September 29, 2021, the Company increased its
   penyertaan pada PT Jasamarga Jogja Bawen sebesar                 investment in PT Jasamarga Jogja Bawen
   Rp4.500.000.000.                                                 amounting to Rp4,500,000,000.

   Berdasarkan keputusan Para Pemegang Saham di Luar                Based on the decision of the Shareholders outside
   Rapat Umum Pemegan Saham yang ditandatangani                     the General Meeting of Shareholders signed on
   pada 29 Desember 2021, Perusahaan menambah                       December 29, 2021, the Company increased its
   penyertaan pada PT Jasamarga Jogja Bawen sebesar                 investment in PT Jasamarga Jogja Bawen
   Rp4.375.000.000.                                                 amounting to Rp4,375,000,000.

  PT Jasamarga Probolinggo Banyuwangi (JPB)                         PT Jasamarga Probolinggo Banyuwangi (JPB)

   WTR, entitas anak, memiliki penyertaan sebesar 40%               WTR, a subsidiary, has 40% investment in JPB or
   pada JPB setara Rp200.000.000, berdasarkan Akta                  equivalent to Rp200,000,000, based on Notarial
   notaris No. 21 tanggal 29 Desember 2017 dari Notaris Ni          deed No. 21 dated December 29, 2017 of Notary Ni
   Nyoman Rai Sumawati, SH., M.Kn.                                  Nyoman Rai Sumawati, SH., M.Kn.

   Berdasarkan akta berita acara RUPS Notaris                       Based on GMS of Notary Ni Nyoman Rai Sumawati,
   Ni Nyoman Rai Sumawati, S.H., M.Kn. No. 23 tanggal               S.H., M.Kn. No. 23 dated January 24, 2018, WTR
   24 Januari 2018, kepemilikan WTR pada JPB menjadi                has ownership in JPB of 0.34%.
   0,34%.

   Berdasarkan akta Notaris No. 30 tanggal 17 Juli 2018 dari        Based on Notarial Deed No. 30 dated July 17, 2018
   Notaris Ashoya Ratam, S.H., M.Kn., kepemilikan WTR               of Notary Ashoya Ratam, S.H., M.Kn., WTR has
   pada JPB menjadi 0,15%.                                          ownership in JPB of 0.15%.


                                                          111
Page 115
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

   PT Hutama Marga Waskita (HMW)                                    PT Hutama Marga Waskita (HMW)

   WTR, entitas anak, memiliki penyertaan sebesar 30% dari          WTR, a subsidiary, has 30% investment in HMW or
   modal HMW atau setara dengan Rp4.500.000.000. HMW                equivalent to Rp4,500,000,000. HMW was
   didirikan sesuai Akta Pendirian No. 24 tanggal 20                established based on Notarial deed No. 24 dated
   Februari 2017 dari Notaris Ni Nyoman Rai Sumawati,               February 20, 2017 by Notary Ni Nyoman Rai
   S.H., M.Kn, bergerak di bidang pengusahaan jalan tol.            Sumawati, S.H., M.Kn and is engaged in toll road
                                                                    concession.

   WTR menambah penyertaan pada HMW sebesar                         WTR increased its investment in HMW amounting to
   Rp22.800.000.000 berdasarkan Keputusan Sirkular                  Rp22,800,000,000, based on the decree of the
   RUPS tanggal 24 Mei 2018 berdasarkan Akta No. 13 dari            Circular of GMS dated May 24, 2018, based on
   Notaris Ni Nyoman Rai Sumawati, S.H., M.Kn., tanggal 8           notarial deed No. 13 by Ni Nyoman Rai Sumawati,
   Juni 2018.                                                       S.H., M.Kn., dated June 8, 2018.

   WTR menambah penyertaan pada HMW sebesar                         WTR increased its investment in HMW amounting to
   Rp25.710.000.000 berdasarkan Keputusan Sirkuler di               Rp25,710,000,000, based on the decree of the
   luar RUPS tanggal 19 Desember 2019.                              Circular outside of GMS dated December 19, 2019.

   Berdasarkan akta No. 07 oleh Notaris Ni Nyoman Rai               Based on deed No. 07 by Notary Ni Nyoman Rai
   Sumawati, S.H., M.Kn., tanggal 11 Oktober 2021,                  Sumawati, S.H., M.Kn., dated October 11, 2021,
   penyertaan WTR pada HMW menjadi 2,96% akibat                     WTR's investment in HMW became 2.96% due to an
   peningkatan modal disetor dan ditempatkan oleh                   increase in paid-in and issued capital by the majority
   pemegang saham mayoritas. Utang HMW kepada WTR                   shareholder. HMW's debt to WTR amounting to
   sebesar Rp550.000.000 dikonversi menjadi penyertaan              Rp550,000,000 was converted into equity
   modal.                                                           participation.

   Berdasarkan akta No. 09 oleh Notaris Ni Nyoman Rai               Based on deed No. 09 by Notary Ni Nyoman Rai
   Sumawati, S.H., M.Kn., tanggal 30 Desember 2022,                 Sumawati, S.H., M.Kn., dated December 30, 2022,
   penyertaan WTR pada HMW menjadi 0,63% akibat                     WTR's investment in HMW became 0,63% due to an
   peningkatan modal disetor dan ditempatkan oleh                   increase in paid-in and issued capital by the majority
   pemegang saham mayoritas.                                        shareholder.

   PT Jasamarga Gedebage Cilacap (JGC)                              PT Jasamarga Gedebage Cilacap (JGC)

   Pendirian PT Jasamarga Gedebage Cilacap adalah                    The establishment of PT Jasamarga Gedebage
   sesuai dengan akta notaris Ni Nyoman Rai Sukmawati,               Cilacap was based on notarial deed No. 8 dated
   S.H., M.Kn. No. 8 tanggal 28 Januari 2022. Akta pendirian         January 28, 2022 of notary Ni Nyoman Rai
   ini telah mendapat pengesahan Menteri Hukum dan Hak               Sukmawati, S.H., M.Kn. This notarial deed has
   Asasi Manusia sesuai dengan Surat Keputusan No. AHU-              been approved by the Minister of Law and Human
   0007639.AH.0101 TAHUN 2022 tanggal 29 Januari 2022.               Rights through decision letter No. AHU-
   Perusahaan memiliki penyertaan sebesar 20% pada JGC               0007639.AH.0101 TAHUN 2022 dated January 29,
   atau setara Rp1.219.100.000.                                      2022. The Company has 20% investment in JCG or
                                                                     equivalent to Rp1,219,100,000.

   Manajemen berpendapat bahwa tidak terdapat                       Management believes that there is no significant
   perbedaan yang signifikan antara jumlah tercatat dengan          difference between book value and the fair value.
   nilai wajarnya.




                                                          112
Page 116
                                                                                                                                  The original consolidated financial statements included herein are in
                                                                                                                                                                             the Indonesian language.


 PT WASKITA KARYA (PERSERO) TBK                                                                                                     PT WASKITA KARYA (PERSERO) TBK
 DAN ENTITAS ANAK                                                                                                                               AND ITS SUBSIDIARIES
 CATATAN ATAS LAPORAN KEUANGAN                                                                                                 NOTES TO THE INTERIM CONSOLIDATED
 KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                                                                           FINANCIAL STATEMENTS AS OF JUNE 30, 2023
 31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                                                                  AND DECEMBER 31, 2022 AND FOR THE SIX
 ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                                                                         MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
 (2022 – DIAUDIT) – Lanjutan                                                                                                             (2022 – AUDITED) – Continued
 (Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                                                                     (Expressed in full Rupiah amount, unless otherwise stated)

16. ASET TETAP - BERSIH                                                                                                   16. FIXED ASSETS - NET
                                                                                                         30 Juni/ June 30, 2023
                                                                                                                                    Aset Diklasifikasi
                                                                                                                                  Dimiliki Untuk Dijual/
                                       Saldo Awal/           Penambahan/          Reklasifikasi/            Pengurangan/             Assets as Held              Revaluasi/          Saldo Akhir/
                                    Beginning Balance          Addition          Recassification             Deduction                  for Sale                Revaluation         Ending Balance
                                           Rp                    Rp                    Rp                       Rp                          Rp                      Rp                    Rp

    Biaya Perolehan                                                                                                                                                                                                 Acquisition Cost
     Tanah                             2.264.204.161.364          404.000.000                     --                        --                         --                     --       2.264.608.161.364                       Land
     Gedung                            1.624.189.439.820          740.450.000           479.303.350                         --                         --                     --       1.625.409.193.170                    Building
     Pabrik                            1.197.112.272.174                    --                                              --                         --                     --       1.197.112.272.174                       Plant
     Perlengkapan Kantor                 113.780.591.564        2.921.236.994        (1.951.689.525)                        --                         --                     --         114.750.139.033             Office Supplies
     Peralatan Proyek                  5.081.554.489.149        6.650.336.554                     --           42.161.983.554                          --                     --       5.046.042.842.149         Project Equipments
     Kendaraan                            12.148.619.323                    --                    --                        --                         --                     --          12.148.619.323                    Vehicles
    Jumlah                           10.292.989.573.394        10.716.023.548        (1.472.386.175)           42.161.983.554                          --                     --     10.260.071.227.213                         Total
    Aset dalam Pembangunan                                                                                                                                                                                       Assets in Progress
     Gedung, Pabrik, dan                                                                                                                                                                                              Building, Plant
      Peralatan Proyek                  200.896.888.113          913.147.405         (3.782.775.205)                        --                         --                     --        198.027.260.313         Project Equipments
    Akumulasi Penyusutan                                                                                                                                                                                    Accumulated Depreciation
     Gedung                              253.775.588.668       28.273.626.950                     --                        --                         --                     --         282.049.215.618                    Building
     Pabrik                              300.991.262.423       24.713.342.295                     --                        --                         --                     --         325.704.604.718                       Plant
     Perlengkapan Kantor                  97.463.837.012          667.782.994        (5.255.161.380)                        --                         --                     --          92.876.458.626             Office Supplies
     Peralatan Proyek                  3.636.006.348.550      212.890.361.627                     --           42.056.447.838                          --                     --       3.806.840.262.339         Project Equipments
     Kendaraan                            11.458.347.933          267.630.843                     --                        --                         --                     --          11.725.978.776                    Vehicles
    Jumlah                             4.299.695.384.586      266.812.744.709        (5.255.161.380)           42.056.447.838                          --                     --       4.519.196.520.077                        Total
    Akumulasi Penurunan Nilai                                                                                                                                                                               Accumulated Impairment
     Biaya Perolehan                                                                                                                                                                                               Acquisition Cost
      Pabrik                              6.962.153.326                     --                      --                      --                         --                     --          6.962.153.326                        Plant
      Peralatan Proyek                                --       36.302.178.368                       --                      --                         --                     --         36.302.178.368         Project Equipments
    Aset Tetap Dalam Penyelesaian                                                                                                                                                                           Construction in Progress
     Gedung, Pabrik, dan                                                                                                                                                                                             Building, Plant
      Peralatan Proyek                   50.073.448.743                     --                      --                      --                         --                     --         50.073.448.743        Project Equipments
      Jumlah                             57.035.602.069        36.302.178.368                       --                      --                         --                     --         93.337.780.437                         Total
    Nilai Buku                         6.137.155.474.852                                                                                               --                              5.845.564.187.012                  Book Value




                                                                                                   31 Desember/ December 31, 2022
                                                                                                                               Aset Diklasifikasi
                                                                                                                             Dimiliki Untuk Dijual/
                                       Saldo Awal/           Penambahan/          Reklasifikasi/            Pengurangan/             Assets as Held              Revaluasi/           Saldo Akhir/
                                    Beginning Balance          Addition          Recassification              Deduction                  for Sale               Revaluation          Ending Balance
                                           Rp                    Rp                   Rp                         Rp                         Rp                      Rp                     Rp
    Biaya Perolehan                                                                                                                                                                                                  Acquisition Cost
     Tanah                             2.264.204.161.364        1.484.485.393        57.401.960.589                          --        (455.410.891.727)                       --       2.264.204.161.364                      Land
     Gedung                            1.624.189.439.820           96.630.348       939.956.544.195                 38.810.635           897.353.566.506                       --       1.624.189.439.820                   Building
     Pabrik                            1.197.112.272.174                    --                                               --        (619.006.030.652)                       --       1.197.112.272.174                      Plant
     Perlengkapan Kantor                 113.780.591.564        2.163.136.995         15.699.645.433             5.578.110.894             3.829.570.240                       --         113.780.591.564            Office Supplies
     Peralatan Proyek                  5.081.554.489.149        1.434.227.400          3.642.558.041            28.510.975.924         (660.047.532.183)                       --       5.081.554.489.149        Project Equipments
     Kendaraan                            12.148.619.323                    --                     --                        --                        --                      --          12.148.619.323                   Vehicles
    Jumlah                            10.292.989.573.394        5.178.480.136                                   34.127.897.453         (833.281.317.816)                       --     10.292.989.573.394                        Total
    Aset dalam Pembangunan                                                                                                                                                                                        Assets in Progress
     Gedung, Pabrik, dan                                                                                                                                                                                              Building, Plant
      Peralatan Proyek                    64.905.780.398      148.995.345.195    (1.138.754.667.464)                         --       1.125.750.429.984                        --        200.896.888.113         Project Equipments
    Akumulasi Penyusutan                                                                                                                                                                                    Accumulated Depreciation
     Gedung                              166.432.649.685       68.720.827.717        18.636.622.731                 14.511.465                        --                       --         253.775.588.668                  Building
     Pabrik                              130.884.890.933       39.891.437.105                     --                         --         130.214.934.385                        --         300.991.262.423                     Plant
     Perlengkapan Kantor                  86.421.558.861       13.762.123.471        (3.081.880.597)             5.511.016.581            5.873.051.858                        --          97.463.837.012           Office Supplies
     Peralatan Proyek                  2.728.770.944.020      379.407.347.947       147.751.058.760             27.927.129.833          408.004.127.656                        --       3.636.006.348.550       Project Equipments
     Kendaraan                            11.202.929.702          255.418.231          (172.999.474)                         --             172.999.474                        --          11.458.347.933                  Vehicles
    Jumlah                             3.123.712.973.201      502.037.154.471                                   33.452.657.879          544.265.113.373                        --       4.299.695.384.586                       Total

    Akumulasi Penurunan Nilai                                                                                                                                                                                 Accumulated Impairment
     Biaya Perolehan                                                                                                                                                                                                 Acquisition Cost
      Pabrik                                            --      6.962.153.326                       --                       --                            --                  --           6.962.153.326                        Plant
    Aset Tetap Dalam Penyelesaian                                                                                                                                                                             Construction in Progress
     Gedung, Pabrik, dan                                                                                                                                                                                               Building, Plant
      Peralatan Proyek                                  --     50.073.448.743                       --                       --                            --                  --         50.073.448.743         Project Equipments
      Jumlah                                            --     57.035.602.069                       --                       --                            --                  --         57.035.602.069                          Total
    Nilai Buku                         7.234.182.380.591                                                                               (251.796.001.205)                                6.137.155.474.852                 Book Value




                                                                                                          113
Page 117
                                                                      The original consolidated financial statements included herein are in
                                                                                                                 the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                 PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                           AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                       FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                              AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                     MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                         (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)             (Expressed in full Rupiah amount, unless otherwise stated)

   Aset tetap, berupa tanah, pabrik, kendaraan dan gedung              Fixed assets in the form of land, plants, vehicles and
   dijadikan jaminan atas perolehan kredit jangka panjang              buildings are used as collateral for Long-Term bank
   MRA dari bank. Sebagian tanah berikut gedungnya                     loans MRA. Some land and buildings above are
   dijadikan jaminan kepada PT Bank Mandiri (Persero) Tbk,             used as collaterals to PT Bank Mandiri (Persero)
   PT Bank Negara Indonesia (Persero) Tbk, dan                         Tbk, PT Bank Negara Indonesia (Persero) Tbk, and
   PT Bank Rakyat Indonesia (Persero) Tbk masing-masing                PT Bank Rakyat Indonesia (Persero) Tbk
   sebesar Rp79.700.000.000, Rp541.247.689.363, dan                    amounting             to          Rp79,700,000,000,
   Rp25.000.000.000,      dengan       nilai   keseluruhan             Rp541.247.689.363,       and      Rp25,000,000,000,
   Rp645.947.689.363 dengan nilai wajar tanah dan gedung               respectively,    with    a     total    amount       of
   yang      dijaminkan    sebesar      Rp717.808.875.983              Rp645.947.689.363 with the fair value of the land
   (Catatan 31).                                                       and buildings as collateral amounting to
                                                                       Rp717,808,875,983 (Note 31).

   Gedung, pabrik dan peralatan dalam pembangunan pada                 The buildings, plants and equipment under
   30 Juni 2023 sebesar Rp198.621.115.663 terutama                     construction as of December 31, 2022 amounting to
   terdiri dari bangunan dalam penyelesaian dari WKI,                  Rp198,621,115,663 mainly consisted of buildings in
   sebesar Rp15.678.910.701, pabrik beton dalam                        progress which belonging to WKI, amounting to
   penyelesaian sebesar Rp172.200.168.783 dan peralatan                Rp15,678,910,701, precast plant in progress
   dan      renovasi   gedung     Perusahaan   sebesar                 amounting       to    Rp172,200,168,783       and
   Rp10.148.180.829.                                                   the Company’s equipment and building renovation
                                                                       amounting to Rp10,148,180,829.

   Berikut presentase dan estimasi penyelesaian aset dalam             The following are the percentages and estimated
   pembangunan pada tanggal 30 Juni 2023:                              date of completion of assets under construction as
                                                                       of June 30, 2023:
                                             Proyek/                                                   Penyelesaian/
                                             Project                                             Percentage of Completion

     Pembangunan Plant Bojonegoro                                                                          95,26%
     Pembangunan Plant Gasing                                                                              99,53%
     Pembangunan Proyek Penajam                                                                            75,73%
     Pembangunan Plant Cikopo                                                                              84,90%
     Proyek Pembangunan Dormitory Karawang                                                                 91,92%

   Tidak ada kemajuan progres atas proyek di atas sejak                There is no progress on the projects above since
   tahun lalu.                                                         prior year.

   Gedung, pabrik dan peralatan dalam pembangunan pada                 The buildings, plants and equipment under
   31 Desember 2022 sebesar Rp200.896.888.113                          construction as of December 31, 2022 amounting to
   terutama terdiri dari bangunan dalam penyelesaian dari              Rp200,896,888,113 mainly consisted of buildings in
   WKI, sebesar Rp15.678.910.701, pabrik beton dalam                   progress which belonging to WKI, amounting to
   penyelesaian sebesar Rp172.200.168.783 dan peralatan                Rp15,678,910,701, precast plant in progress
   dan    renovasi       gedung   Perusahaan     sebesar               amounting       to    Rp172,200,168,783       and
   Rp13.017.808.629.                                                   the Company’s equipment and building renovation
                                                                       amounting to Rp13,017,808,629.

   Revaluasi aset tetap dilakukan secara berkala setiap tiga           Revaluation of fixed assets will be done periodically
   (3) tahun.                                                          every three (3) years.

   Berdasarkan keputusan Dewan Komisaris PT Waskita                    Based on decision of Board of Comisioner
   Beton Precast Tbk No. 60/WBP/DK/2021, tanggal                       PT    Waskita      Beton   Precast    Tbk    No.
   24 Juni 2021 mengenai persetujuan penjualan aset tetap              60/WBP/DK/2021, dated June 24, 2021 regarding
   atas Pabrik Gasing, Karawang, Cibitung dan Klaten                   approval of the sale of fixed assets of Gasing,
   dengan nilai buku sebesar Rp1.414.766.634.427. Sesuai               Karawang, Cibitung, and Klaten Plant with book
   surat persetujuan Dewan Komisaris maka aset tetap                   value of Rp1,414,766,634,427. In accordance with
   tersebut direklasifikasi menjadi aset diklasifikasikan              the approval letter from the Board of
   untuk dijual.                                                       Commissioners, the fixed assets were reclassified
                                                                       as Assets Held for Sale.

   Berdasarkan keputusan Dewan Komisaris PT Waskita                    Based on decision of Board of Comisioners of
   Beton Precast Tbk No. 28/WBP/DK/2022, tanggal                       PT Waskita Beton Precast Tbk No. 28/WBP/2022,
   24 Juni 2022 mengenai penjualan aset tetap WBP, aset                dated June 24, 2022 regarding thex` sale of WBP's
   dimiliki untuk dijual tersebut direklasifikasi ke aset tetap.       fixed assets, the assets held for sale were
                                                                       reclassified to fixed assets.

                                                            114
Page 118
                                                                                                                                            The original consolidated financial statements included herein are in
                                                                                                                                                                                       the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                                                                                 PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                                                                                           AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                                                                                       FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                                                                              AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                                                                                     MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                                                                                         (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                                                                                 (Expressed in full Rupiah amount, unless otherwise stated)

   Beban penyusutan dialokasikan sebagai berikut:                                                                                             Depreciation expenses are allocated as follows:

                                                                                                          30 Juni/                         30 Juni/
                                                                                                       June 30, 2023                    June 30, 2022
                                                                                                            Rp                               Rp

    Beban Pokok Pendapatan (Catatan 42)                                                                      191.061.238.034                 32.643.037.376                                                         Cost of Revenues (Note 42)
    Beban Umum dan Administrasi                                                                                                                                                                                     General and Administrative
     (Catatan 43)                                                                                             75.751.506.675                 95.020.217.594                                                                Expenses (Note 43)
    Jumlah                                                                                                   266.812.744.709               127.663.254.970                                                                                            Total


   Pada tanggal 30 Juni 2023, gedung, pabrik, peralatan                                                                                    As of June 30, 2023, buildings, plants, project
   proyek dan kendaraan untuk seluruh unit bisnis serta                                                                                    equipments and vehicles for all business units and
   kantor pusat telah diasuransikan dengan nilai                                                                                           head office were insured as follows:
   pertanggungan dan risiko sebagai berikut:

                Nama Asuradur/                                           Jenis Aset/                                                                 Periode Asuransi/                                    Nilai Pertanggungan/             Perusahaan/
                   Insurer                                             Type of Assets                                                                Insurance Period                                       The Sum Insured                 Company
                                                                                                                                                                                                                    Rp
     PT Asuransi Kredit Indonesia (Persero)   Asuransi Risiko Properti/ Property All Risk Insurance                   1 Februari/ February 1, 2023     s.d/ to        1 Februari/ February 1, 2024             220.026.000.000   PT Waskita Beton Precast Tbk
     PT Asuransi Kredit Indonesia (Persero)   Asuransi Gempa Bumi/ Earthquake Insurance                               1 Februari/ February 1, 2023     s.d/ to        1 Februari/ February 1, 2024             220.026.000.000   PT Waskita Beton Precast Tbk
     PT Asuransi Kredit Indonesia (Persero)   Asuransi Risiko Properti/ Property All Risk Insurance                      4 Maret/ March 4, 2023        s.d/ to           4 Maret/ March 4, 2024                173.860.000.000   PT Waskita Beton Precast Tbk
     PT Asuransi Kredit Indonesia (Persero)   Asuransi Gempa Bumi/ Earthquake Insurance                                  4 Maret/ March 4, 2023        s.d/ to           4 Maret/ March 4, 2024                173.860.000.000   PT Waskita Beton Precast Tbk
     PT Asuransi Kredit Indonesia (Persero)   Asuransi Risiko Properti/ Property All Risk Insurance                   18 Januari/ January 18, 2023     s.d/ to        18 Januari/ January 18, 2024              96.379.000.000   PT Waskita Beton Precast Tbk
     PT Asuransi Kredit Indonesia (Persero)   Asuransi Gempa Bumi/ Earthquake Insurance                               18 Januari/ January 18, 2023     s.d/ to        18 Januari/ January 18, 2024              96.379.000.000   PT Waskita Beton Precast Tbk
     PT BRI Asuransi Indonesia                Asuransi Risiko Properti/ Property All Risk Insurance                   18 Januari/ January 18, 2023     s.d/ to        18 Januari/ January 18, 2024              86.743.000.000   PT Waskita Beton Precast Tbk
     PT BRI Asuransi Indonesia                Asuransi Gempa Bumi/ Earthquake Insurance                               18 Januari/ January 18, 2023     s.d/ to        18 Januari/ January 18, 2024              86.743.000.000   PT Waskita Beton Precast Tbk
     PT Asuransi Central Asia (ACA)           Asuransi Contractor's All Risk                                          30 Januari/ Januari 30, 2023     s.d/ to           30 Juni/ June 30, 2023              2.525.965.112.965   PT Waskita Beton Precast Tbk
     PT Asuransi Jasindo (Persero)            Contractor's All Risk Including Third Party Legal Liability          09 Desember/ December 09, 2016      s.d/ to     09 Desember/ December 09, 2023            4.274.484.619.000   PT Waskita Beton Precast Tbk
     PT Asuransi Tri Pakarta                  Asuransi Risiko Properti/ Property All Risk Insurance                    1 Agustus/ August 1, 2022       s.d/ to         1 Agustus/ August 1, 2023                67.429.710.000   PT Waskita Karya (Persero) Tbk
     PT Asuransi Tri Pakarta                  Asuransi Gempa Bumi/ Earthquake Insurance                                1 Agustus/ August 1, 2022       s.d/ to         1 Agustus/ August 1, 2023                67.429.710.000   PT Waskita Karya (Persero) Tbk
     PT Asuransi Jasindo (Persero)            Asuransi Gempa Bumi/ Earthquake Insurance                                1 Agustus/ August 1, 2022       s.d/ to         1 Agustus/ August 1, 2023                 2.452.470.000   PT Waskita Karya (Persero) Tbk
     PT Asuransi Jasindo (Persero)            Asuransi Kebakaran/ Fire Insurance                                       2 Agustus/ August 2, 2022       s.d/ to         2 Agustus/ August 2, 2023                 2.452.470.000   PT Waskita Karya (Persero) Tbk
     PT Asuransi Aspan                        Asuransi Risiko Properti/ Property All Risk Insurance                       25 Mei/ May 25, 2023         s.d/ to            25 Mei/ May 25, 2024                   2.022.226.500   PT Waskita Karya (Persero) Tbk
     PT Asuransi Jasindo (Persero)            Asuransi Kebakaran/ Fire Insurance                                       12 Maret/ March 12, 2023        s.d/ to         12 Maret/ March 12, 2024                  1.269.270.000   PT Waskita Karya (Persero) Tbk
     PT Asuransi Jasindo (Persero)            Asuransi Gempa Bumi/ Earthquake Insurance                                12 Maret/ March 12, 2023        s.d/ to         12 Maret/ March 12, 2024                  1.269.270.000   PT Waskita Karya (Persero) Tbk
     PT Asuransi Tri Pakarta                  Asuransi Gempa Bumi/ Earthquake Insurance & Risiko Industri/         23 November/ November 23, 2022      s.d/ to     23 November/ November 23, 2023              205.595.378.570   PT Waskita Karya Infrastruktur
                                              Industrial All Risk
     PT Asuransi Tri Pakarta                  Asuransi Kerusakan Mesin/ Machinery Breakdown Insurance               23 November/ November 23, 2022     s.d/ to      23 November/ November 23, 2023             55.677.339.062    PT Waskita Karya Infrastruktur
     PT Asuransi Tri Pakarta                  Polis Liabilitas Publik/ Public Liability Policy                      23 November/ November 23, 2022     s.d/ to      23 November/ November 23, 2023              1.000.000.000    PT Waskita Karya Infrastruktur
     PT Asuransi Bangun Askrida               Asuransi Risiko Properti/ Property All Risk Insurance                 12 November/ November 12, 2022     s.d/ to      12 November/ November 12, 2023            141.136.800.000    PT Waskita Karya Infrastruktur
     PT Sunday Insurance Indonesia            Asuransi Risiko Properti/ Property All Risk Insurance                      26 Juni/ June 26, 2023        s.d/ to           26 Juni/ June 26, 2024               123.683.628.714    PT Waskita Karya Realty
     PT Sunday Insurance Indonesia            Asuransi Gempa Bumi/ Earthquake Insurance                                  26 Juni/ June 26, 2023        s.d/ to           26 Juni/ June 26, 2024               123.683.628.714    PT Waskita Karya Realty
     PT Sunday Insurance Indonesia            Asuransi Kerusakan Mesin/ Machinery Breakdown Insurance                    26 Juni/ June 26, 2023        s.d/ to           26 Juni/ June 26, 2024                20.000.000.000    PT Waskita Karya Realty
     PT Sunday Insurance Indonesia            Polis Liabilitas Publik/ Public Liability Policy                           26 Juni/ June 26, 2023        s.d/ to           26 Juni/ June 26, 2024                 5.000.000.000    PT Waskita Karya Realty
     PT Sunday Insurance Indonesia            Business Interruption Insurance (PAR)                                      26 Juni/ June 26, 2023        s.d/ to           26 Juni/ June 26, 2024                25.000.000.000    PT Waskita Karya Realty
     PT Sunday Insurance Indonesia            Business Interruption Insurance (MB)                                       26 Juni/ June 26, 2023        s.d/ to           26 Juni/ June 26, 2024                20.000.000.000    PT Waskita Karya Realty
     PT Sunday Insurance Indonesia            Business Interruption Insurance (EQVET)                                    26 Juni/ June 26, 2023        s.d/ to           26 Juni/ June 26, 2024                25.000.000.000    PT Waskita Karya Realty
     PT Sunday Insurance Indonesia            Personal Accident                                                          26 Juni/ June 26, 2023        s.d/ to           26 Juni/ June 26, 2024                     5.056.000    PT Waskita Karya Realty
                                                                                                                                                                                          Jumlah/ Total      8.844.572.689.525


   Pada tanggal 31 Desember 2022, gedung, pabrik,                                                                                          As of December 31, 2022, buildings, plants, project
   peralatan proyek dan kendaraan untuk seluruh unit bisnis                                                                                equipments and vehicles for all business units and
   serta kantor pusat telah diasuransikan dengan nilai                                                                                     head office were insured as follows:
   pertanggungan dan risiko sebagai berikut:




                                                                                                                     115
Page 119
                                                                                                                                        The original consolidated financial statements included herein are in
                                                                                                                                                                                   the Indonesian language.


 PT WASKITA KARYA (PERSERO) TBK                                                                                                            PT WASKITA KARYA (PERSERO) TBK
 DAN ENTITAS ANAK                                                                                                                                      AND ITS SUBSIDIARIES
 CATATAN ATAS LAPORAN KEUANGAN                                                                                                        NOTES TO THE INTERIM CONSOLIDATED
 KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                                                                                  FINANCIAL STATEMENTS AS OF JUNE 30, 2023
 31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                                                                         AND DECEMBER 31, 2022 AND FOR THE SIX
 ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                                                                                MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
 (2022 – DIAUDIT) – Lanjutan                                                                                                                    (2022 – AUDITED) – Continued
 (Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                                                                            (Expressed in full Rupiah amount, unless otherwise stated)

                  Nama Asuradur/                                    Jenis Aset/                                                                Periode Asuransi/                                     Nilai Pertanggungan/             Perusahaan/
                     Insurer                                      Type of Assets                                                               Insurance Period                                        The Sum Insured                 Company
                                                                                                                                                                                                               Rp
       PT Asuransi Jasindo (Persero)     Asuransi Risiko Properti/ Property All Risk Insurance                  18 Januari/ January 18, 2022      s.d/ to        18 Januari/ January 18, 2023             323.373.000.000   PT Waskita Beton Precast Tbk
       PT Asuransi Jasindo (Persero)     Asuransi Gempa Bumi/ Earthquake Insurance                              18 Januari/ January 18, 2022      s.d/ to        18 Januari/ January 18, 2023             323.373.000.000   PT Waskita Beton Precast Tbk
       PT Asuransi Jasindo (Persero)     Asuransi Risiko Properti/ Property All Risk Insurance                  1 Februari/ February 1, 2022      s.d/ to        1 Februari/ February 1, 2023             220.026.000.000   PT Waskita Beton Precast Tbk
       PT Asuransi Jasindo (Persero)     Asuransi Gempa Bumi/ Earthquake Insurance                              1 Februari/ February 1, 2022      s.d/ to        1 Februari/ February 1, 2023             220.026.000.000   PT Waskita Beton Precast Tbk
       PT Asuransi Jasindo (Persero)     Asuransi Risiko Properti/ Property All Risk Insurance                  18 Januari/ January 18, 2022      s.d/ to        18 Januari/ January 18, 2023             196.956.000.000   PT Waskita Beton Precast Tbk
       PT Asuransi Jasindo (Persero)     Asuransi Gempa Bumi/ Earthquake Insurance                              18 Januari/ January 18, 2022      s.d/ to        18 Januari/ January 18, 2023             196.956.000.000   PT Waskita Beton Precast Tbk
       PT Asuransi Jasindo (Persero)     Asuransi Risiko Properti/ Property All Risk Insurance                     4 Maret/ March 4, 2022         s.d/ to           4 Maret/ March 4, 2023                173.860.000.000   PT Waskita Beton Precast Tbk
       PT Asuransi Jasindo (Persero)     Asuransi Gempa Bumi/ Earthquake Insurance                                 4 Maret/ March 4, 2022         s.d/ to           4 Maret/ March 4, 2023                173.860.000.000   PT Waskita Beton Precast Tbk
       PT Asuransi Jasindo (Persero)     Asuransi Risiko Properti/ Property All Risk Insurance                  18 Januari/ January 18, 2022      s.d/ to        18 Januari/ January 18, 2023              96.379.000.000   PT Waskita Beton Precast Tbk
       PT Asuransi Jasindo (Persero)     Asuransi Gempa Bumi/ Earthquake Insurance                              18 Januari/ January 18, 2022      s.d/ to        18 Januari/ January 18, 2023              96.379.000.000   PT Waskita Beton Precast Tbk
       PT Asuransi Jasindo (Persero)     Asuransi Risiko Properti/ Property All Risk Insurance                  1 Februari/ February 1, 2022      s.d/ to        1 Februari/ February 1, 2023              88.105.000.000   PT Waskita Beton Precast Tbk
       PT Asuransi Jasindo (Persero)     Asuransi Gempa Bumi/ Earthquake Insurance                              1 Februari/ February 1, 2022      s.d/ to        1 Februari/ February 1, 2023              88.105.000.000   PT Waskita Beton Precast Tbk
       PT Asuransi Jasindo (Persero)     Asuransi Risiko Properti/ Property All Risk Insurance                  18 Januari/ January 18, 2022      s.d/ to        18 Januari/ January 18, 2023              86.743.000.000   PT Waskita Beton Precast Tbk
       PT Asuransi Jasindo (Persero)     Asuransi Gempa Bumi/ Earthquake Insurance                              18 Januari/ January 18, 2022      s.d/ to        18 Januari/ January 18, 2023              86.743.000.000   PT Waskita Beton Precast Tbk
       PT Asuransi Jasindo (Persero)     Asuransi Risiko Properti/ Property All Risk Insurance                  1 Februari/ February 1, 2022      s.d/ to        1 Februari/ February 1, 2023              60.921.000.000   PT Waskita Beton Precast Tbk
       PT Asuransi Jasindo (Persero)     Asuransi Gempa Bumi/ Earthquake Insurance                              1 Februari/ February 1, 2022      s.d/ to        1 Februari/ February 1, 2023              60.921.000.000   PT Waskita Beton Precast Tbk
       PT Asuransi Purna Artha Nugraha   Asuransi Contractor's All Risk                                          30 Mei 2022/ May 30, 2022        s.d/ to     31 Desember/ December 31, 2022               75.793.497.302   PT Waskita Beton Precast Tbk
       PT Asuransi Purna Artha Nugraha   Asuransi Contractor's All Risk                                        18 Oktober/ October 18, 2021       s.d/ to           11 April/ April 11, 2023               91.322.772.103   PT Waskita Beton Precast Tbk
       PT Asuransi Central Asia (ACA)    Asuransi Contractor's All Risk                                      21 Desember/ December 21, 2020       s.d/ to        30 Januari/ Januari 30, 2023           2.442.660.241.478   PT Waskita Beton Precast Tbk
       PT Asuransi Tri Pakarta           Asuransi Risiko Properti/ Property All Risk Insurance                    1 Agustus/ August 1, 2022       s.d/ to         1 Agustus/ August 1, 2023                67.429.710.000   PT Waskita Karya (Persero) Tbk
       PT Asuransi Tri Pakarta           Asuransi Gempa Bumi/ Earthquake Insurance                                1 Agustus/ August 1, 2022       s.d/ to         1 Agustus/ August 1, 2023                67.429.710.000   PT Waskita Karya (Persero) Tbk
       PT Asuransi Jasindo (Persero)     Asuransi Gempa Bumi/ Earthquake Insurance                                1 Agustus/ August 1, 2022       s.d/ to         1 Agustus/ August 1, 2023                 2.452.470.000   PT Waskita Karya (Persero) Tbk
       PT Asuransi Jasindo (Persero)     Asuransi Kebakaran/ Fire Insurance                                       2 Agustus/ August 2, 2022       s.d/ to         2 Agustus/ August 2, 2023                 2.452.470.000   PT Waskita Karya (Persero) Tbk
       PT Asuransi Aspan                 Asuransi Risiko Properti/ Property All Risk Insurance                      25 Mei/ May 25, 2022          s.d/ to           25 Mei/ May 25, 2023                    2.022.226.500   PT Waskita Karya (Persero) Tbk
       PT Asuransi Jasindo (Persero)     Asuransi Kebakaran/ Fire Insurance                                       12 Maret/ March 12, 2022        s.d/ to          12 Maret/ March 12, 2023                   539.800.000   PT Waskita Karya (Persero) Tbk
       PT Asuransi Tri Pakarta           Asuransi Gempa Bumi/ Earthquake Insurance & Risiko Industri/        23 November/ November 23, 2022       s.d/ to     23 November/ November 23, 2023              205.595.378.570   PT Waskita Karya Infrastruktur
                                         Industrial All Risk
       PT Asuransi Tri Pakarta           Asuransi Kerusakan Mesin/ Machinery Breakdown Insurance             23 November/ November 23, 2022       s.d/ to     23 November/ November 23, 2023              55.677.339.062    PT Waskita Karya Infrastruktur
       PT Asuransi Tri Pakarta           Polis Liabilitas Publik/ Public Liability Policy                    23 November/ November 23, 2022      s.d/ to      23 November/ November 23, 2023               1.000.000.000    PT Waskita Karya Infrastruktur
       PT Asuransi Bangun Askrida        Asuransi Risiko Properti/ Property All Risk Insurance               12 November/ November 12, 2022      s.d/ to      12 November/ November 12, 2023             141.136.800.000    PT Waskita Karya Infrastruktur
       PT Asuransi Binagriya Upakara     Asuransi Risiko Properti/ Property All Risk Insurance                  16 Januari/ January 16, 2022     s.d/ to        16 Januari/ January 16, 2023             109.686.499.024    PT Waskita Karya Realty
       PT Asuransi Binagriya Upakara     Asuransi Gempa Bumi/ Earthquake Insurance                              16 Januari/ January 16, 2022     s.d/ to        16 Januari/ January 16, 2023             109.686.499.024    PT Waskita Karya Realty
       PT Asuransi Binagriya Upakara     Asuransi Kerusakan Mesin/ Machinery Breakdown Insurance                16 Januari/ January 16, 2022     s.d/ to        16 Januari/ January 16, 2023              30.000.000.000    PT Waskita Karya Realty
       PT Asuransi Binagriya Upakara     Polis Liabilitas Publik/ Public Liability Policy                       16 Januari/ January 16, 2022     s.d/ to        16 Januari/ January 16, 2023               5.000.000.000    PT Waskita Karya Realty
       PT Asuransi Binagriya Upakara     Business Interruption Insurance (PAR)                                  16 Januari/ January 16, 2022     s.d/ to        16 Januari/ January 16, 2023              25.000.000.000    PT Waskita Karya Realty
       PT Asuransi Binagriya Upakara     Business Interruption Insurance (MB)                                   16 Januari/ January 16, 2022     s.d/ to        16 Januari/ January 16, 2023              20.000.000.000    PT Waskita Karya Realty
                                                                                                                                                                                     Jumlah/ Total      5.947.611.413.063


    Manajemen berpendapat bahwa nilai pertanggungan                                                                                        The management believes that insurance coverage
    atas aset tetap yang diasuransikan adalah cukup untuk                                                                                  for fixed assets which have been insured
    menutup kemungkinan kerugian yang terjadi.                                                                                             are adequate to cover the possible losses.

17. ASET HAK GUNA USAHA - BERSIH                                                                                                 17. RIGHT-OF-USE ASSETS - NET

    Di bawah ini adalah jumlah yang tercatat aset hak guna                                                                                 Below are the carrying amounts of right-of-use
    yang diakui dan mutasinya selama periode berjalan:                                                                                     assets recognized and the movements during
                                                                                                                                           the period:

                                                              1 Januari/                           Penambahan/                    Pengurangan/                           30 Juni/
                                                            Januari 1, 2023                         Additions                      Deductions                         June 30, 2023
                                                                 Rp                                    Rp                             Rp                                   Rp
    Aset Guna Usaha                                                                                                                                                                                                                         Leased Assets
     Tanah                                                         36.849.513.052                                    --                        245.000.000                  36.604.513.052                                                          Land
     Bangunan                                                       9.907.863.466                                    --                        238.602.179                   9.669.261.287                                                       Building
     Kendaraan                                                    137.053.091.510                        2.153.805.745                                   --                139.206.897.255                                                       Vehicles
     Peralatan                                                      5.929.211.568                                    --                                  --                  5.929.211.568                                                     Equipment
    Jumlah Harga Perolehan                                        189.739.679.596                        2.153.805.745                         483.602.179                 191.409.883.162                                       Total Acquisition Cost

    Akumulasi Depresiasi                                                                                                                                                                                                     Accumulated Depreciation
     Tanah                                                         24.841.616.308                        2.161.334.354                          97.959.180                  26.904.991.482                                                     Land
     Bangunan                                                       8.725.623.081                          381.914.647                                   --                  9.107.537.728                                                  Building
     Kendaraan                                                    111.713.959.790                       11.142.746.695                                   --                122.856.706.485                                                  Vehicles
     Peralatan                                                      4.827.819.060                                    --                                  --                  4.827.819.060                                                Equipment
    Total                                                         150.109.018.239                       13.685.995.696                          97.959.180                 163.697.054.755                                                                   Total
    Jumlah Aset Guna Usaha                                          39.630.661.357                                                                                          27.712.828.407                                         Total Leased Assets




                                                                                                                 116
Page 120
                                                                                                        The original consolidated financial statements included herein are in
                                                                                                                                                   the Indonesian language.


 PT WASKITA KARYA (PERSERO) TBK                                                                            PT WASKITA KARYA (PERSERO) TBK
 DAN ENTITAS ANAK                                                                                                      AND ITS SUBSIDIARIES
 CATATAN ATAS LAPORAN KEUANGAN                                                                        NOTES TO THE INTERIM CONSOLIDATED
 KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                                                  FINANCIAL STATEMENTS AS OF JUNE 30, 2023
 31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                                         AND DECEMBER 31, 2022 AND FOR THE SIX
 ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                                                MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
 (2022 – DIAUDIT) – Lanjutan                                                                                    (2022 – AUDITED) – Continued
 (Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                                             (Expressed in full Rupiah amount, unless otherwise stated)

                                            1 Januari/                 Penambahan/                  Pengurangan/            31 Desember/
                                          Januari 1, 2022               Additions                    Deductions           December 31, 2022
                                               Rp                          Rp                           Rp                       Rp
     Aset Guna Usaha                                                                                                                                                        Leased Assets
      Tanah                                    92.479.148.996                          --               55.629.635.944           36.849.513.052                                     Land
      Bangunan                                 16.315.793.851                803.617.169                 7.211.547.554            9.907.863.466                                  Building
      Kendaraan                               140.482.142.658              9.682.183.986                13.111.235.134          137.053.091.510                                  Vehicles
      Peralatan                                 5.940.745.693                          --                   11.534.125            5.929.211.568                                Equipment
     Jumlah Harga Perolehan                   255.217.831.198             10.485.801.155                75.963.952.757          189.739.679.596                      Total Acquisition Cost

     Akumulasi Depresiasi                                                                                                                                          Accumulated Depreciation
      Tanah                                    71.887.029.072               9.274.763.624               56.320.176.388           24.841.616.308                                      Land
      Bangunan                                 15.000.867.720                 936.302.915                7.211.547.554            8.725.623.081                                   Building
      Kendaraan                                94.674.690.088             26.569.770.285                 9.530.500.583          111.713.959.790                                   Vehicles
      Peralatan                                 4.827.819.060                           --                           --           4.827.819.060                                 Equipment
     Total                                    186.390.405.940             36.780.836.824                73.062.224.525          150.109.018.239                                        Total
     Jumlah Aset Guna Usaha                    68.827.425.258                                                                     39.630.661.357                       Total Leased Assets


    Grup menyewa beberapa aset termasuk tanah,                                                            The Group leases several assets including land,
    bangunan, kendaraan dan peralatan. Rata – rata masa                                                   buildings, vehicles and equipment. The average
    sewa adalah 2,5 tahun.                                                                                lease term is 2.5 years.

    Beban amortisasi aset hak guna usaha dicatat sebagai                                                  Amortization expense of right of use assets
    beban umum dan administrasi.                                                                          recorded in general and administrative expense.

    Berikut adalah jumlah laba rugi yang diakui dalam laba                                               The following are the amounts recognized in profit
    rugi:                                                                                                or loss:

                                                                      30 Juni/                         30 Juni/
                                                                   June 30, 2023                    June 30, 2022
                                                                        Rp                               Rp
      Beban penyusutan aset hak guna                                     4.431.123.076                  6.828.662.169                     Depreciation expense of right-of-use assets
      Beban bunga liabilitas sewa                                          552.047.016                  1.690.257.238                            Interest expense on lease liabilities

     Jumlah yang diakui dalam laba rugi                                  4.983.170.092                  8.518.919.407                         Total amount recognized in profit or loss


    Pada tanggal 30 Juni 2023 dan 31 Desember 2022 total                                                 In June 30, 2023 and December 31, 2022
    pengeluaran kas untuk sewa adalah sebesar                                                            the total cash disbursements for leases amounting
    Rp10.619.530.907 dan Rp37.595.618.302.                                                               to Rp10,619,530,907, and Rp37,595,618,302,
                                                                                                         respectively.

18. GOODWILL                                                                                        18. GOODWILL

                                                                                         2023
                                                   1 Januari/            Penambahan/                Pengurangan/           30 Juni/
                                                   January 1,             Additions                  Deduction             June 30,
                                                       Rp                    Rp                         Rp                    Rp

     Biaya Perolehan                              4.025.903.165.936                      --                        --     4.025.903.165.936                                Acquisition Cost
     Nilai Buku                                   4.025.903.165.936                      --                        --     4.025.903.165.936                                Net Book Value


                                                                                             2022
                                                   1 Januari/             Penambahan/               Pengurangan/          31 Desember/
                                                   January 1,              Additions                 Deduction            December 31,
                                                       Rp                     Rp                        Rp                     Rp

     Biaya Perolehan                               1.393.315.461.804      3.099.202.962.876         (466.615.258.744)     4.025.903.165.936                                  Acquisition Cost
     Nilai Buku                                    1.393.315.461.804      3.099.202.962.876         (466.615.258.744)     4.025.903.165.936                                 Net Book Value




                                                                                  117
Page 121
                                                                                   The original consolidated financial statements included herein are in
                                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                            PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                                      AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                                  FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                         AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                                MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                                    (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                          (Expressed in full Rupiah amount, unless otherwise stated)

   Rincian nilai tercatat goodwill adalah sebagai berikut:                          The details of goodwill are as follows:

    Entitas Pengakuisisi/                      Perolehan Saham pada/                        Tahun Perolehan/                Nilai Neto/ Net Value
      Acquirer Entity                           Share Acquisition in                       Year of Acquisition             30 Juni/ June 30, 2023
                                                                                                                      31 Desember/ December 31, 2022
                                                                                                                                     Rp

   PT Waskita Toll Road     PT Waskita Transjawa Toll Road                                        2022                                 3.099.202.962.876
   PT Waskita Toll Road     PT Pemalang Batang Toll Road (PBTR)                                   2016                                   183.723.536.629
   PT Waskita Toll Road     PT Waskita Sriwijaya Tol (WST)                                        2016                                    58.782.241.692
   PT Waskita Toll Road     PT Trans Jabar Tol (TJT)                                              2015                                   684.194.424.739
   Jumlah/ Total                                                                                                                       4.025.903.165.936


   Akuisisi WTTR                                                                   WTTR Acquisition

   Pada tanggal 31 Desember 2021, WTR memiliki                                      As of December 31, 2021 WTR has a 35.5% interest
   kepemilikan sebesar 35,5% di WTTR dan mencatat                                   in WTTR and recorded the investment as an
   investasi tersebut sebagai investasi asosiasi.                                   investment in associates.

   Berdasarkan Berita Acara RUPUP Reksa Dana                                        Based on the Minutes of RUPUP Equity Limited
   Penyertaan Terbatas Ekuitas Danareksa Infrastruktur                              Participation Mutual Fund Danareksa Trans Java
   Trans Jawa (“RDPT EDITJ”) No. 89 tanggal 27 Juli 2022                            Infrastructure (“RDPT EDITJ”) No. 89 dated
   oleh Notaris Ir Nanette Cahyanie Handari Adi Warsito,                            July 27, 2022 by Notary Ir Nanette Cahyanie Handari
   WTR melakukan pelunasan secara bertahap terhadap                                 Adi Warsito, WTR will pay off in stages
   unit penyertaan para pemegang unit RDPT sekitar 80%                              the participation units of RDPT unit holders of
   dari total unit yang dimiliki investor RDPT yaitu sebesar                        around 80% of the total units owned by RDPT
   Rp5.256.112.000.000. Pelaksanaan pelunasan bertahap                              investors,      which    is    Rp5,256,112,000,000.
   tersebut dilakukan paling lambat Agustus 2022. WTR                               The gradual redemption will be carried out no later
   akan membeli sisa unit penyertaan apabila sudah                                  than August 2022. WTR will buy the remaining units
   memiliki ketersediaan dana dengan estimasi nilai sebesar                         if it has available funds with an estimated value of
   Rp1.300.000.000.000.                                                             Rp1,300,000,000,000

  Berdasarkan akta No. 60 tanggal 26 Agustus 2022 yang                              Based on deed No. 60 dated 26 August 2022 made
  dibuat dihadapan Ir. Nanette Cahyanie Handari Adi                                 before Ir. Nanette Cahyanie Handari Adi Warsito,
  Warsito, bahwa para pemegang saham menyetujui                                     whereas the shareholders agreed to WTR's action to
  tindakan WTR melakukan Call Option saham RDPT di                                  make a Call Option for RDPT shares in WTTR
  WTTR melalui pembelian unit penyertaan (Subscription)                             through the purchase of a participation unit
  dengan harga sebesar Rp6.546.570.473.856.                                         (Subscription) at a price of Rp6,546,570,473,856.

   Berdasarkan      surat     konfirmasi   pembelian                                Based     on   purchase    confirmation   letter
   No. CPD1906FXQ37565 tanggal 30 Agustus 2022, WTR                                 No. CPD1906FXQ37565 dated August 30, 2022,
   telah melakukan pembelian 80% penyertaan RDPT                                    WTR has purchased 80% investment in RDPT in the
   sebesar Rp5.256.112.000.000.                                                     amount of Rp5,256,112,000,000.

   Nilai wajar aset yang diperoleh dan kewajiban yang                               The fair values of the assets acquired and liabilities
   dialihkan pada tanggal akuisisi adalah sebagai berikut:                          assumed at the acquisition date were as follows:

   Kas dan Setara Kas                                                  592.155.597.432                                       Cash and Cash Equivalents
   Kas yang Dibatasi Penggunaannya                                       37.152.657.435                                                  Restricted Cash
   Piutang lain-lain                                                 3.933.193.897.861                                                Other Receivables
   Uang Muka dan Biaya Dibayar di Muka                                 159.705.967.881                                  Advances and Prepaid Expense
   Pajak Dibayar Dimuka                                                   1.291.833.496                                                     Prepaid Tax
   Aset Tetap                                                               711.370.880                                                      Fixed Asset
   Aset Takberwujud - Hak Pengusahaan Jalan Tol                      4.758.609.943.178                   Intangible Assets - Toll Road Concession Right
   Aset Hak Guna                                                          2.112.797.313                                               Right of Use Asset
   Aset Pajak Tangguhan                                                      19.114.431                                              Deferred Tax Asset
   Utang Usaha                                                       (228.094.511.490)                                                    Trade Payable
   Biaya yang Masih Harus Dibayar                                       (2.289.316.663)                                                Accrual Expenses
   Utang Pajak                                                       (574.687.217.350)                                                      Tax Payable
   Utang Bank                                                      (2.728.861.984.472)                                                        Bank Loan
   Provisi pelapisan jalan tol                                         (66.277.758.922)                                             Provision for overlay
   Liabilitas Sewa                                                      (2.377.739.580)                                                 Lease Liabilities
   Liabilitas Lain-lain                                              (462.281.294.927)                                                   Other Liabilities
   Nilai Wajar Aset Bersih Teridentifikasi                                                                                     Fair Value of Identifiable
    yang Diperoleh                                                     5.420.083.356.506                                           Net Asset Acquired




                                                                       118
Page 122
                                                                        The original consolidated financial statements included herein are in
                                                                                                                   the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                 PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                           AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                       FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                              AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                     MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                         (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)               (Expressed in full Rupiah amount, unless otherwise stated)

   Goodwill dan arus kas keluar bersih yang timbul dari                 Goodwill and net cash outflow arising from such
   akuisisi adalah sebagai berikut:                                     acquisition are as follows:
   Imbalan kas yang dialihkan                              5.256.112.000.000                                 Cash consideration transferred
   Kepentingan non-pengendali                                646.073.936.094                                        Non-controlling interest
   Investasi Asosiasi                                      2.617.100.383.287                                       Investment in associate
   Sub jumlah                                              8.519.286.319.381                                                        Subtotal
   Nilai Wajar Aset Bersih teridentifikasi                                                                          Fair Value of identifiable
    yang diperoleh                                        (5.420.083.356.506)                                            net asset acquired
   Goodwill yang timbul dari akuisisi                      3.099.202.962.875                             Goodwill arising from acquisition


   Akuisisi WST                                                         WST Acquisition

   Nilai wajar aset yang diperoleh dan kewajiban yang                    The fair values of the assets acquired and liabilities
   dialihkan pada tanggal akuisisi adalah sebagai berikut:               assumed at the acquisition date were as follows:
   Kas dan Setara Kas                                        303.517.604.893                                    Cash and Cash Equivalents
   Aset Pajak Tangguhan                                         1.232.557.000                                          Deferred Tax Assets
   Proyek Dalam Pelaksanaan                                  135.758.968.659                                           Project on Progress
   Aset Tetap                                                      36.876.125                                                 Fixed Assets
   Utang Pajak                                                (6.050.791.698)                                                Tax Payables
   Utang Pihak Berelasi                                       (3.471.807.800)                                      Related Parties Payable
   Liabilitas Imbalan Kerja                                   (3.993.810.000)                                     Post-Employment Benefit
   Nilai Wajar Aset Bersih Teridentifikasi                                                                        Fair Value of Identifiable
    yang Diperoleh                                           427.029.597.179                                          Net Asset Acquired
   Nilai Wajar Aset Kepentingan Nonpengendali              (170.811.838.872)                           Fair value of Non-Controlling Interest
   Goodwill                                                   58.782.241.693                                                        Goodwill
   Nilai Wajar Imbalan yang Dialihkan                        315.000.000.000                     Fair Value of Consideration Transferred


   Pada tanggal 19 Mei 2016, WTR dan PT Persada                          On May 19, 2016, WTR and PT Persada Tanjung
   Tanjung Api-api menandatangani perjanjian pembelian                   Api-api entered into an agreement to purchase 60%
   60% kepemilikan PT WST dengan harga perolehan                         ownership interest in PT WST amounting to
   sebesar Rp315.000.000.000.                                            Rp315,000,000,000.

   Akuisisi PBTR                                                         PBTR Acquisition

  Nilai wajar aset yang diperoleh dan kewajiban yang                     The fair values of the assets acquired and liabilities
  dialihkan pada tanggal akuisisi adalah sebagai berikut:                assumed at the acquisition date were as follows:
   Kas dan Setara Kas                                          1.283.729.504                                    Cash and Cash Equivalents
   Pajak Dibayar di Muka                                         576.893.132                                                      Prepaid Tax
   Aset Takberwujud - Hak Pengusahaan Jalan Tol             109.002.363.811                 Intangible Assets - Toll Road Concession Right
   Utang Pajak                                                   (39.261.438)                                                   Tax Payables
   Beban Akrual                                                (816.220.871)                                             Accrued Expenses
   Liabilitas Lain-lain Jangka Pendek                            (43.804.858)                                      Other Liabilities - Current
   Liabilitas Lain-lain Jangka Panjang                      (49.502.926.995)                                  Other Liabilities - Non Current
   Nilai Wajar Aset Bersih Teridentifikasi                                                                        Fair Value of Identifiable
    yang Diperoleh                                            60.460.772.285                                          Net Asset Acquired
   Nilai Wajar Aset Kepentingan Nonpengendali               (24.184.308.914)                           Fair value of Non-Controlling Interest
   Goodwill                                                 183.723.536.629                                                         Goodwill
   Nilai Wajar Imbalan yang Dialihkan                        220.000.000.000                     Fair Value of Consideration Transferred


   Pada tanggal 15 Februari 2016, WTR dan                                On     February     15,   2016,   WTR       and
   PT Langkah Utama Perkasa, Countryside Investment                      PT Langkah Utama Perkasa, Countryside
   Corporation dan PT Sumber Mitra Jaya menandatangani                   Investment Corporation and PT Sumber Mitra Jaya
   perjanjian pembelian 60% kepemilikan PT PBTR dengan                   entered into an agreement to purchase
   harga perolehan sebesar Rp220.000.000.000.                            60% ownership in PT PBTR amounted to
                                                                         Rp220,000,000,000.




                                                           119
Page 123
                                                                                          The original consolidated financial statements included herein are in
                                                                                                                                     the Indonesian language.


 PT WASKITA KARYA (PERSERO) TBK                                                                PT WASKITA KARYA (PERSERO) TBK
 DAN ENTITAS ANAK                                                                                          AND ITS SUBSIDIARIES
 CATATAN ATAS LAPORAN KEUANGAN                                                            NOTES TO THE INTERIM CONSOLIDATED
 KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                                      FINANCIAL STATEMENTS AS OF JUNE 30, 2023
 31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                             AND DECEMBER 31, 2022 AND FOR THE SIX
 ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                                    MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
 (2022 – DIAUDIT) – Lanjutan                                                                        (2022 – AUDITED) – Continued
 (Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                                (Expressed in full Rupiah amount, unless otherwise stated)

    Akuisisi TJT                                                                            TJT Acquisition

    Nilai wajar aset yang diperoleh dan kewajiban yang                                      The fair values of the assets acquired and liabilities
    dialihkan pada tanggal akuisisi adalah sebagai berikut:                                 assumed at the acquisition date were as follows:

    Kas dan Setara Kas                                                       4.525.513.134                                      Cash and Cash Equivalents
    Piutang Lain Lain                                                       55.380.122.729                                              Other Receivables
    Uang Muka dan Biaya Dibayar di Muka                                    210.596.774.983                                   Advances and Prepaid Expense
    Aset Tetap                                                             761.525.928.371                                                    Fixed Assets
    Utang Usaha                                                          (544.722.104.382)                                               Accounts Payable
    Utang Bank                                                           (168.360.859.675)                                                      Bank Loan
    Utang Pajak                                                                (40.926.508)                                                  Tax Payables
    Liabilitas Lainnya                                                         (80.750.000)                                                Other Liabilities
    Nilai Wajar Aset Bersih Teridentifikasi                                                                                          Fair Value of Identifiable
     yang Diperoleh                                                        318.823.698.652                                               Net Asset Acquired
    Nilai Wajar Aset Kepentingan Nonpengendali                             (58.504.123.391)                             Fair value of Non-Controlling Interest
    Goodwill                                                               684.194.424.739                                                           Goodwill
    Nilai Wajar Imbalan yang Dialihkan                                     944.514.000.000                         Fair Value of Consideration Transferred


    Pada tanggal 22 Desember 2015, WTR bersama dengan                                       On December 22, 2015, WTR, PT Bukaka Teknik
    PT           Bukaka         Teknik         Utama,                                       Utama, PT Graha Multitama Sejahtera and PT Karya
    PT Graha Multitama Sejahtera dan PT Karya Perkasa                                       Perkasa Insani entered into an agreement to
    Insani menandatangani perjanjian pembelian 81,65%                                       purchase 81.65% ownership in PT TJT amounted to
    kepemilikan PT TJT dengan harga perolehan sebesar                                       Rp944,514,000,000.
    Rp944.514.000.000.

    Goodwill yang sebelumnya diakui oleh Grup telah                                        The previously goodwill has been recognized by
    diperhitungkan dalam keuntungan penjualan dan                                          the Group is included in Gain of sale the investments
    investasi dan nilai investasi pada entitas asosiasi                                    and the value of investment in associated entities.

19. ASET LAIN-LAIN                                                                    19. OTHER ASSETS

                                                                  30 Juni/                 31 Desember/
                                                                June 30, 2023            December 31, 2022
                                                                     Rp                         Rp
    Aset Lain-lain - Bagi Hasil                                     218.287.489.233           194.736.942.548                         Other Assets - Profit Sharing
    Kas yang Dibatasi Penggunaannya - Jangka Panjang                159.284.364.664           152.352.431.268                       Restricted Cash - Long - Term
    Beban Kontrak Ditangguhkan                                       69.453.743.475            25.199.639.931                          Contract Deferred Charges
    Tanah dan Bangunan                                               71.217.404.049            68.179.173.110                                  Land and Buildings
    Perangkat Lunak - Bersih                                         53.320.590.510            85.449.857.717                                        Software - net
    Uang Jaminan                                                    480.005.809.623            43.693.427.551                                             Warranty
    Aset Tidak Lancar Lainnya                                       781.512.004.363           781.512.004.363                            Other Non-current Assets
    Dikurangi: Penyisihan Kerugian Penurunan Nilai                (329.810.143.730)         (329.810.143.730)              Less: Allowance for Impairment Losses
    Jumlah                                                       1.503.271.262.187          1.021.313.332.758                                                 Total


   Beban kontrak yang ditangguhkan merupakan beban                                          Contract deferred charges represent deferred
   yang ditangguhkan atas proyek-proyek yang dalam                                          expense of the projects’ preparation, which will be
   persiapan, yang akan dibebankan sebagai beban kontrak                                    charged as expense when the project contract
   pada saat proyek tersebut dilaksanakan.                                                  is executed.

   Perangkat Lunak terdiri dari:                                                            Software consists of:

                                                                                                           30 Juni/ June 30, 2023
                                                                                Harga Perolehan/           Akumulasi Amortisasi/                Nilai Buku/
                                                                                 Historical Cost         Accumulated Amortication               Book Value
                                                                                       Rp                            Rp                             Rp

    SAP S/4 Hana                                                                      128.906.470.280                  84.900.213.253               44.006.257.027
    Building Information Modelling                                                      7.462.259.602                   3.352.238.528                4.110.021.074
    ERP MS Dynamics AX2012                                                             49.421.936.841                  49.421.936.841                            --
    Waskita Employee Self Service Technology (WEST)                                       822.180.000                     822.180.000                            --
    Lain-lain/ Other s (dibawah/ below Rp 500 Juta/ Million )                           5.242.984.406                      38.671.997                5.204.312.409
    Jumlah/ Total                                                                     191.855.831.129                 138.535.240.619               53.320.590.510




                                                                         120
Page 124
                                                                          The original consolidated financial statements included herein are in
                                                                                                                     the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                   PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                             AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                         FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                       MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                           (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                (Expressed in full Rupiah amount, unless otherwise stated)

                                                                                       31 Desember/ December 31, 2022
                                                                Harga Perolehan/            Akumulasi Amortisasi/           Nilai Buku/
                                                                 Historical Cost          Accumulated Amortication          Book Value
                                                                       Rp                            Rp                         Rp

   SAP S/4 Hana                                                      130.450.129.426                   54.325.043.953           76.125.085.473
   Building Information Modelling                                      7.462.259.602                    2.363.550.946            5.098.708.656
   ERP MS Dynamics AX2012                                             49.421.936.841                   49.327.082.323               94.854.518
   Waskita Employee Self Service Technology (WEST)                       822.180.000                      822.180.000                        --
   Lain-lain/ Others (dibawah/ below Rp 500 Juta/ Million )            4.449.278.906                      318.069.836            4.131.209.070
   Jumlah/ Total                                                     192.605.784.775                  107.155.927.058           85.449.857.717


   Aset lain-lain tanah dan bangunan adalah sebagai                        Other assets land and buildings as follows:
   berikut:

  1.     Tanah di Cengkareng yang dibeli oleh Perusahaan                    1. Land located in Cengkareng which was
         pada tanggal 21 Mei 1991. Selanjutnya, di tahun                       purchased by the Company on May 21, 1991.
         1996, Perusahaan menyampaikan Surat kepada                            Furthermore, in 1996, the Company submitted a
         Kepala Dinas Tata Kota Jakarta Barat mengenai                         letter to the Head of City Planning, West Jakarta
         peruntukkan tanah tersebut. Kemudian Perusahaan                       regarding the designation of the land. Then the
         memperoleh jawaban berdasarkan Surat Pemerintah                       Company received the answer by letter from the
         Kotamadya Jakarta Barat Suku Dinas Tata Kota No.                      Sub Department of City Planning, West Jakarta
         288/17125 tanggal 18 Juli 1996, yang menyebutkan                      District No. 288/17125 dated July 18, 1996,
         sesuai dengan Rencana Bagian Wilayah Kota                             which stated that in accordance with the
         Kecamatan Kalideres tahun 2005 lokasi tanah                           planning of the Kalideres District year 2005, the
         tersebut diperuntukan untuk Penyempurnaan Hijau                       land is allocated for the Public Green
         Umum (PHU). Sehingga Perusahaan tidak dapat                           Improvement. Hence the Company can not
         memproses sertifikat kepemilikan lebih lanjut.                        process the certificated ownership further.

         Perusahaan telah memperoleh sertifikat Hak Guna                           The company has obtained The Right of
         Bangunan No 10451 pada tanggal 7 September                                Building certificate No 10451 on September 7,
         2022. Berdasarkan hal tersebut, Perusahan                                 2022. Based on this, the Company reclassified
         mereklasifikasi aset tanah di Cengkareng menjadi                          land assets in Cengkareng to Fixed Assets
         Aset Tetap.

  2.     Apartemen sejumlah 50 unit yang merupakan                          2. Apartments with a total of 50 units which are
         pembayaran berupa aset atas piutang usaha dan                         asset settlement for accounts receivables and
         retensi dari PT Ade Pede Realty pada tanggal 24 Mei                   retention receivables from PT Ade Pede Realty
         2022.                                                                 on May 24, 2022.

   Perusahaan tidak menggunakan tanah dan apartemen                        The Company does not use the land and the
   tersebut     dalam    kegiatan    operasional  ataupun                  apartments in its operations or rental to the third
   menyewakannya kepada pihak ketiga, sehubungan aset                      parties in line with those assets is not
   tersebut tidak terkait dengan kegiatan utama                            related to the main activities of the Company.
   Perusahaan.       Perusahaan     berpendapat    bahwa                   The management believes that the land and
   apartemen tanah tersebut tidak memenuhi kriteria untuk                  the apartments do not meet the criteria to be
   diklasifikasikan sebagai aset tetap, sehingga mencatat                  classified as fixed assets, so that those assets are
   aset tersebut diatas sebagai aset lain-lain.                            recorded as other assets.

   Aset lain-lain – Bagi Hasil terdiri dari:                               Other assets – Profit Sharing consists of:

                                                                           Harga Perolehan/
                                                                            Historical Cost
                        Nama Proyek Bagi Hasil/                   30 Juni/                  31 Desember/                     Lokasi/
                        Name of Profit Sharing Project         June 30, 2023              December 31, 2022                 Location
                                                                    Rp                           Rp


         1 Teraskita Bandung                                         91.143.019.386               80.977.940.617            Bandung
         2 Teraskita Makasar                                        127.144.469.847              113.759.001.931            Makasar
       Jumlah/ Total                                                218.287.489.233              194.736.942.548




                                                              121
Page 125
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

   Aset lain-lain – bagi hasil merupakan penambahan dari            Other assets – profit sharing are the addition of
   konstruksi dalam penyelesaian Hotel Dafam Teraskita di           construction completion of Hotel Dafam Teraskita
   Bandung dan Makassar sebesar Rp218.287.489.233 dan               in Bandung and Makassar amounting to
   Rp194.736.942.548 pada tanggal 30 Juni 2023 dan 31               Rp218,287,489,233 and Rp194,736,942,548 as of
   Desember 2022.                                                   June 30, 2023 and 31 Desember 2022, respectively.

   Berdasarkan Surat Pernyataan Direksi tanggal                     Based on the Board of Directors' Statement dated
   18 April 2017, Perusahaan memberikan hak                         April    18,    2017,     the   Company      granted
   pengembangan tanah seluas 1.535 M2 yang terletak di Jl.          the development rights of 1,535 sqm of land located
   Asia Afrika No. 55 RT 003 RW 03 Kelurahan Kebon                  at Jl. Asia Africa No. 55 RT 003 RW 03 Kebon
   Pisang Kecamatan Sumur Bandung dengan bukti                      Pisang Village, Sumur Bandung District with proof
   kepemilikan SHGB No. 655 atas nama Perusahaan                    of ownership of SHGB No. 655 on behalf of the
   kepada PT Waskita Karya Realty. Berdasarkan Surat                Company to PT Waskita Karya Realty. Based on
   Pernyataan No. 81/SPN/WK/2017 tanggal 29 September               Statement No. 81/SPN/WK/2017 dated September
   2017, Perusahaan memberikan hak pengembangan                     29, 2017, the Company provided development
   tanah seluas 1.661 m2 berdasarkan SHGB No. 20407 dan             rights to land covering an area of 1,661 sqm based
   seluas 168 m2 berdasarkan SHGB No. 20403 atas nama               on SHGB No. 20407 and an area of 168 sqm based
   Perusahaan, yang terletak di Jalan Jl. A.P. Pettarani 88         on SHGB No. 20403 on behalf of the Company,
   RT 002 RW 02 Kelurahan Buakana Kecamatan                         located at Jalan Jl. A.P. Pettarani 88 RT 002 RW 02
   Rappocini Kota Makassar.                                         Village Buakana Rappocini District, Makassar City.

   Aset Tidak Lancar Lainnya                                        Other Non-current Assets

   Berdasarkan Berita Acara Evaluasi Perubahan Rencana              Based on the Minutes of Evaluation of Changes to
   Usaha Pengusahaan Jalan Tol Krian – Legundi – Bunder             the Krian - Legundi - Bunder - Manyar Toll Road
   – Manyar No. 57/BA/Pt.6/2022 tanggal 19 Juli 2022,               Concession Business Plan No. 57/BA/Pt.6/2022
   WBW dan BPJT sepakat melakukan penyesuaian                       dated July 19, 2022, WBW and BPJT agreed to
   Rencana Usaha Jalan Tol KLBM, yang mengakibatkan                 make adjustments to the KLBM Toll Road Business
   konstruksi dan pengusahaan Seksi IV (Bunder-Manyar)              Plan, which resulted in the construction and
   sepanjang 9,39 km di bundling dengan pengusahaan                 concession of 9.39 km Section IV (Bunder-Manyar)
   jalan tol Tuban-Gresik. Berdasarkan hal tersebut, WBW            being bundling with the concession of the Tuban-
   melakukan reklasifikasi dari Aset Dalam Penyelesaian             Gresik toll road. Based on the foregoing, WBW
   Aset Tak Berwujud – Hak Pengusahaan Jalan Tol ke aset            reclassified from Intangible Assets - Toll Road
   lain-lain sebesar Rp781.512.004.363.                             Concession Rights to other assets in the amount of
                                                                    Rp781,512,004,363.

   WBW melakukan pencadangan beban kerugian                         WBW provided allowance for impairment losses on
   penurunan nilai atas potensi kemungkinan aset dalam              potential assets under construction that cannot be
   penyelesaian yang tidak dapat terpulihkan sebesar                recovered amounting to Rp329,810,143,730, which
   Rp329.810.143.730 yang tercatat sebagai Pendapatan               was recorded as Other Income (Expenses) – Net
   (Beban) Lain – lain – Bersih (Catatan 43).                       (Notes 43)




                                                          122
Page 126
                                                                                                            The original consolidated financial statements included herein are in
                                                                                                                                                       the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                                                  PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                                                            AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                                                        FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                                               AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                                                      MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                                                          (2022 – AUDITED) – Continued
 (Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                                                 (Expressed in full Rupiah amount, unless otherwise stated)

20. ASET TAK BERWUJUD – HAK PENGUSAHAAN                                                               20. INTANGIBLE  ASSETS                                    –          TOLL          ROAD
    JALAN TOL                                                                                             CONCESSION RIGHTS
                                                                                     30 Juni/ June 30, 2023
                                  Saldo Awal/          Penambahan/           Pengurangan/               Reklasifikasi/          Penyesuaian/         Saldo Akhir/
                               Beginning Balance        Additions             Deductions             Reclassification            Adjustment         Ending Balance
                                      Rp                   Rp                    Rp                          Rp                      Rp                   Rp
    Biaya Perolehan                                                                                                                                                                 Acquisition Cost
     Ruas Jalan Tol :                                                                                                                                                             Toll Road Section :
      Krian-Legundi-Bunder       10.796.542.312.941                     --                     --                        --                          10.796.542.312.941       Krian-Legundi-Bunder
      Pemalang - Batang           7.869.740.216.309                     --                     --                        --                    --     7.869.740.216.309          Pemalang - Batang
      Ciawi - Sukabumi            4.605.402.061.725                     --                     --                        --                    --     4.605.402.061.725            Ciawi - Sukabumi
      Kayu Agung -                                                                                                       --                                                            Kayu Agung -
       Palembang - Betung         3.076.660.137.454                     --                     --                        --                    --     3.076.660.137.454        Palembang - Betung
      Pasuruan - Probolinggo      4.176.882.493.840                     --                     --                        --                    --     4.176.882.493.840      Pasuruan - Probolinggo
                                 30.525.227.222.269                     --                     --                        --                    --    30.525.227.222.269
    Aset Dalam Penyelesaian                                                                                                                                                 Construction in Progress
     Ruas Jalan Tol :                                                                                                                                                            Toll Road Section :
      Kayu Agung -                                                                                                                                                                    Kayu Agung -
      Palembang - Betung         13.373.450.893.251       801.116.680.494                      --                        --                    --    14.174.567.573.745        Palembang - Betung
     Ciawi - Sukabumi             2.182.608.557.843       180.584.930.004                      --                        --                    --     2.363.193.487.847            Ciawi - Sukabumi
     Pasuruan - Probolinggo       1.189.424.872.407       256.125.839.027                      --                        --                    --     1.445.550.711.434      Pasuruan - Probolinggo
     Krian-Legundi-Bunder           877.846.492.601           129.088.757                      --                        -- 0                  --       877.975.581.358       Krian-Legundi-Bunder
                                 17.623.330.816.102     1.237.956.538.282                      --                        --                    --    18.861.287.354.384
    Akumulasi                                                                                                                                                                           Accumulated
     Amortisasi                                                                                                                                                                          Amortization
     Ruas Jalan Tol :                                                                                                                                                             Toll Road Section :
      Pemalang - Batang             326.407.370.251       46.169.876.254                       --                        --                    --      372.577.246.505           Pemalang - Batang
      Kayu Agung -                                                                                                                                                                     Kayu Agung -
       Palembang - Betung            58.643.526.581        8.754.884.299                       --                        --                    --       67.398.410.880         Palembang - Betung
      Krian-Legundi-Bunder           81.913.759.242       20.676.682.077                       --                        --                    --      102.590.441.319        Krian-Legundi-Bunder
      Ciawi - Sukabumi              115.412.148.619       20.387.412.518                       --                        --                    --      135.799.561.137             Ciawi - Sukabumi
      Pasuruan - Probolinggo         49.577.922.636        7.156.396.634                       --                        --                    --       56.734.319.270       Pasuruan - Probolinggo
                                    631.954.727.329      103.145.251.782                       --                        --                    --       735.099.979.111
    Nilai Tercatat               47.516.603.311.042                                                                                                  48.651.414.597.542               Carrying Value


                                                                                31 Desember/ December 31, 2022
                                  Saldo Awal/          Penambahan/           Pengurangan/           Reklasifikasi/              Penyesuaian/         Saldo Akhir/
                               Beginning Balance        Additions             Deductions           Reclassification              Adjustment         Ending Balance
                                      Rp                   Rp                     Rp                      Rp                         Rp                   Rp
    Biaya Perolehan                                                                                                                                                                 Acquisition Cost
     Ruas Jalan Tol :                                                                                                                                                             Toll Road Section :
      Krian-Legundi-Bunder       10.796.542.312.941                     --                     --                        --                          10.796.542.312.941       Krian-Legundi-Bunder
      Pemalang - Batang           7.869.740.216.309                     --                     --                        --                    --     7.869.740.216.309          Pemalang - Batang
      Ciawi - Sukabumi            4.605.402.061.725                     --                     --                        --                    --     4.605.402.061.725            Ciawi - Sukabumi
      Kayu Agung -                                                                                                       --                                                            Kayu Agung -
       Palembang - Betung                         --                    --                    --         3.076.660.137.454                     --     3.076.660.137.454        Palembang - Betung
      Pasuruan - Probolinggo                      --    4.176.882.493.840                     --                         --                    --     4.176.882.493.840      Pasuruan - Probolinggo
      Cimanggis - Cibitung        2.062.350.940.365                     --    2.100.203.212.875             37.852.272.510                     --                     --       Cimanggis - Cibitung
                                 25.334.035.531.340     4.176.882.493.840                      --        3.114.512.409.964                     --    30.525.227.222.269
    Aset Dalam Penyelesaian                                                                                                                                                 Construction in Progress
     Ruas Jalan Tol :                                                                                                                                                            Toll Road Section :
      Kayu Agung -                                                                                                                                                                    Kayu Agung -
      Palembang - Betung         13.929.995.828.455     2.520.115.202.250                     --       (3.076.660.137.454)                     --    13.373.450.893.251        Palembang - Betung
     Cimanggis - Cibitung         6.417.925.099.524                     --    6.380.072.827.014           (37.852.272.510)                     --                     --       Cimanggis - Cibitung
     Ciawi - Sukabumi             1.675.865.428.743       506.743.129.100                     --                        --                     --     2.182.608.557.843            Ciawi - Sukabumi
     Pasuruan - Probolinggo                       --    1.189.424.872.407                     --                        --                     --     1.189.424.872.407      Pasuruan - Probolinggo
     Krian-Legundi-Bunder         1.204.597.030.534      454.761.466.430        781.512.004.363                          --                    --      877.846.492.601        Krian-Legundi-Bunder
                                 23.228.383.387.256     4.671.044.670.187     7.161.584.831.377        (3.114.512.409.964)                     --    17.623.330.816.102
    Akumulasi                                                                                                                                                                           Accumulated
     Amortisasi                                                                                                                                                                          Amortization
     Ruas Jalan Tol :                                                                                                                                                             Toll Road Section :
      Pemalang - Batang             238.478.512.859       87.928.857.392                       --                        --                    --      326.407.370.251           Pemalang - Batang
      Kayu Agung -                                                                                                                                                                     Kayu Agung -
       Palembang - Betung            36.161.563.604       22.481.962.977                      --                         --                    --       58.643.526.581         Palembang - Betung
      Krian-Legundi-Bunder           42.065.162.835       39.848.596.407                      --                         --                    --       81.913.759.242        Krian-Legundi-Bunder
      Ciawi - Sukabumi               84.163.636.312       31.248.512.307                      --                         --                    --      115.412.148.619             Ciawi - Sukabumi
      Pasuruan - Probolinggo                      --      49.577.922.636                      --                         --                    --       49.577.922.636       Pasuruan - Probolinggo
      Cimanggis - Cibitung           17.639.565.048                    --        17.639.565.048                          --                    --                    --       Cimanggis - Cibitung
                                    418.508.440.658      231.085.851.719                       --                        --                    --      631.954.727.329
    Nilai Tercatat               48.143.910.477.938                                                                                                  47.516.603.311.042               Carrying Value



     Aset dalam penyelesaian direklasifikasi menjadi biaya                                                      Construction in progress reclassified as acquisition
     perolehan hak pengusahaan jalan tol ketika masa                                                            cost of toll road concession rights when toll road
     konstruksi telah selesai dan mulai beroperasi.                                                             construction has completed and start operating.
     Penyesuaian pada hak pengusahaan jalan tol                                                                 Adjustment on toll road concession rights is due to
     disebabkan oleh revaluasi hak pengusahaan jalan tol.                                                       revaluation. Amortization expense of toll road
     Beban amortisasi hak pengusahaan jalan tol dicatat                                                         consession rights recorded in cost of revenues toll
     sebagai beban pokok pendapatan jalan tol.                                                                  road.


                                                                                        123
Page 127
                                                                                       The original consolidated financial statements included herein are in
                                                                                                                                  the Indonesian language.


 PT WASKITA KARYA (PERSERO) TBK                                                              PT WASKITA KARYA (PERSERO) TBK
 DAN ENTITAS ANAK                                                                                        AND ITS SUBSIDIARIES
 CATATAN ATAS LAPORAN KEUANGAN                                                          NOTES TO THE INTERIM CONSOLIDATED
 KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
 31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                           AND DECEMBER 31, 2022 AND FOR THE SIX
 ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
 (2022 – DIAUDIT) – Lanjutan                                                                      (2022 – AUDITED) – Continued
 (Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                             (Expressed in full Rupiah amount, unless otherwise stated)

21. ASET KEUANGAN ATAS PROYEK KONSESI                                            21. FINANCIAL              ASSETS         FROM        CONCESSION
                                                                                     PROJECT

                                                                        30 Juni/           31 Desember/
                                                                     June 30, 2023       December 31, 2022
                                                                          Rp                    Rp

      Pembayaran Kapasitas Minimum di Masa Depan:                                                                         Future Minimum Capacity Payment:
       Tidak Lebih dari Satu Tahun                                     73.952.831.040         73.952.831.040                         Not Later than One Year
       Lebih dari Satu Tahun Tetapi Tidak Lebih Dari Lima Tahun       215.695.757.200        226.874.673.520        Later than One Year Later than Five Year
       Lebih dari Lima Tahun                                          434.257.903.204        460.055.402.404                             Later than Five Year
      Jumlah Pembayaran Kapasitas Minimum di Masa Depan               723.906.491.444        760.882.906.964        Total Future Minimum Capacity Payments

      Pendapatan Keuangan yang Belum Diterima                         397.541.826.999        422.482.487.157                Less Unearned Financial Income
      Nilai Sekarang dari Pembayaran Kapasitas Masa Depan             326.364.664.445        338.400.419.807      Present Value of Future Capacity Payments
      Dikurangi: Bagian yang Jatuh Tempo Dalam Satu Tahun              26.597.797.052         25.000.237.835                                 Current Portion
      Bagian Jangka Panjang                                           299.766.867.393        313.400.181.972                           Non-Current Portion


    Akun ini merupakan piutang tidak lancar dari PLN                                     This account represents non-current receivable
    sehubungan dengan pembayaran kapasitas minimum                                       from PLN in relation to the future minimum capacity
    masa depan yang tercantum dalam PPA yang telah                                       payments set forth in PPA that have been
    diklasifikasikan sebagai aset keuangan sebagai hasil                                 classified as financial asset as a result of adoption
    penerapan ISAK 16.                                                                   of ISAK 16.

    Pada tanggal 9 Desember 2016, WSE memulai operasi                                    On December 9, 2016, WSE had its commercial
    komersial (COD) untuk proyek konsesi ini. Pada                                       operation date (COD) on this concession project.
    30 Juni 2023 dan 2022, WSE mengakui pendapatan                                       As of June 30, 2023 and 2022, WSE recognized the
    konsesi masing-masing sebesar Rp18.288.151.659                                       concession       revenues      amounting      to
    dan Rp30.470.977.921                                                                 Rp18,288,151,659      and      Rp30,470,977,921,
                                                                                         respectively.

    Fasilitas pembangkit tenaga mini hidro (infrastruktur)                               Mini hydro power generating facility (infrastructure)
    telah dijadikan jaminan untuk pinjaman jangka panjang                                has been pledged as collateral for long-term loan
    dari pihak ketiga (Catatan 24).                                                      from the third party (Note 24).

22. UTANG USAHA                                                                  22. ACCOUNTS PAYABLE

                                                               30 Juni/                31 Desember/
                                                            June 30, 2023            December 31, 2022
                                                                 Rp                         Rp
      Pemasok                                                4.181.730.775.919          4.562.241.771.175                                       Suppliers
      Subkontraktor                                          2.251.890.533.019          2.260.384.280.322                                 Subcontractors
      Sewa Alat                                                352.882.079.043            286.274.088.719                               Rental Equipment
      Upah Kerja                                               201.568.409.213            181.760.522.013                                         Wages
      Lain-lain                                                190.991.959.550            158.488.674.105                                          Others
      Jumlah                                                 7.179.063.756.744          7.449.149.336.334                                            Total


    Tidak ada bunga yang dibebankan pada utang usaha                                     No interest is charged to the accounts payable due.
    yang sudah jatuh tempo.

23. UTANG BANK JANGKA PENDEK                                                     23. SHORT-TERM BANK LOANS

                                                                                                            30 Juni/                 31 Desember/
                                                                                                         June 30, 2023             December 31, 2022
                                                                                                              Rp                          Rp
      Pihak Ketiga/ Third Parties
       Entitas Anak/ Subsidiary Entity - WBP
        PT Bank DKI                                                                                         671.127.052.202              671.127.052.202
       Entitas Anak/ Subsidiary Entity - WKR
        PT Bank Pembangunan Daerah
         Jawa Barat dan Banten Tbk                                                                          100.000.000.000              100.000.000.000
        PT BPR Inti Dana Sukses Makmur                                                                       30.000.000.000               18.000.000.000
       Entitas Anak/ Subsidiary Entity - WKI
        PT Bank Pembangunan Daerah
         Jawa Barat dan Banten Tbk                                                                                           --           24.923.303.844
      Jumlah/ Total                                                                                         801.127.052.202              814.050.356.046



                                                                        124
Page 128
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

   Entitas Anak – WBP                                               Subsidiary – WBP

   PT Bank DKI                                                   6. PT Bank DKI
                                                                 7.
   Berdasarkan Surat No. 36/SPPK/910/III/2022 tanggal            8. Based on Letter No. 36/SPPK/910/III/2022 dated
   30 Maret 2022 mengenai Surat Pemberitahuan                        March 30, 2022 regarding Credit Approval
   Persetujuan Kredit (SPPK), WBP mendapatkan fasilitas              Notification Letter, WBP received restructuring KMK
   KMK restrukturisasi I sebesar Rp684.000.000.000 dan               I facility amounting to Rp684,000,000,000 and
   KMK restrukturisasi II sebesar Rp14.988.751.911.                  restructuring      KMK       II     amounting       to
   Jangka waktu pinjaman sampai dengan 31 Oktober                    Rp14,988,751,911. The loan period is until October
   2022. Suku bunga sebesar 9,50% per tahun.                         31, 2022. The interest rate of 9.50% per annum.
                                                                 9.
   Pembatasan:                                                   10. Negative Covenant:
                                                                 11.
   1. Mengalihkan hak atas agunan yang sudah dijaminkan          12. 1. Transferring the right to collateral that has been
      ke Bank DKI kepada pihak lain.                                    pledged to Bank DKI to another party.

   2. Mengikatkan diri sebagai penjamin hutang atau              13. 2. Binding themselves as guarantor of debt or
      menjaminkan harta kekayaan Perusahaan yang                        pledging the Company's assets that have been
      sudah dijaminkan ke Bank DKI kepada pihak lain.                   pledged to Bank DKI to other parties.

   3. Mengalihkan/menyerahkan kepada pihak lain,                 14. 3. Transferring / surrendering to other parties, in
      sebagian atau seluruhnya atas hak dan kewajiban                    part or in whole for rights and obligations arising
      yang timbul berkaitan dengan fasilitas kredit Debitur              in connection with Debtor credit facilities at Bank
      di Bank DKI.                                                       DKI.
                                                                 15.
   Bank DKI pada tanggal 5 Juli 2022 mengajukan kasasi           16. Bank DKI on July 5, 2022, filed a cassation to the
   kepada Mahkamah Agung Republik Indonesia dengan                   Supreme Court of the Republic of Indonesia with
   register perkara No. 1455 K/Pdt.Sus-Pailit/2022                   case register No. 1455 K/Pdt.Sus-Pailit/2022
   (“Permohonan Kasasi”) atas pengesahan (homologasi)                (“Cassation Application”) on the ratification
   Perjanjian Perdamaian oleh Majelis Hakim pada                     (homologation) of the Reconciliation Agreement by
   Pengadilan Niaga pada Pengadilan Negeri Jakarta Pusat             the Panel of Judges at the Commercial Court at the
   pada perkara No.497/Pdt.Sus-PKPU/2021/PN.Niaga.                   Central      Jakarta    District   Court     in    case
   Jkt.Pst (“Perjanjian Perdamaian”).                                No.       497/Pdt.Sus-PKPU/2021/PN.Niaga.Jkt.Pst
                                                                     (“Reconciliation Agreement”).
                                                                 17.
   Berdasarkan website Kepaniteraan Mahkamah Agung               18. Based on the website of the Registrar's Office of the
   Republik Indonesia, Mahkamah Agung telah menolak                  Supreme Court of the Republic of Indonesia,
   Permohonan Kasasi pada tanggal 20 September 2022.                 Supreme Court of the Republic of Indonesia has
   Namun, sampai dengan saat ini, Mahkamah Agung                     rejected the Cassation Application on September
   Republik Indonesia belum menyediakan salinan putusan              20, 2022. However, to date, Supreme Court of
   Permohonan Kasasi kepada WBP.                                     Republic of Indonesia has not yet provided the copy
                                                                     of the decision on the Cassation Application to
                                                                     WBP.
                                                                 19.
   Berdasarkan Perjanjian Perdamaian, penyelesaian utang         20. According to the Composition Plan, debt settlement
   Bank DKI akan diselesaikan melalui Golongan Tranche               of Bank DKI shall be settled through Tranche B and
   B dan Tranche C dari Perjanjian Perdamaian sebagai                Tranche C of the Reconciliation Agreement as
   berikut:                                                          follows:
                                                                 21.
   Tranche B:                                                    22. Tranche B:
                                                                 23.
   15% dari total porsi utang Bank DKI akan diselesaikan         24. 15% of the total debt portion of Bank DKI will be
   pada tahun ke-5 dan akan diselesaikan oleh WBP dalam              settled in the 5th year and will be settled by
   jangka waktu 6 tahun yang akan bersumber dari Cash                the WBP within 6 years which will be sourced from
   Flow Available Debt Service (CFADS).                              Cash Flow Available Debt Service (CFADS).
                                                                 25.




                                                          125
Page 129
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

   Tranche C:                                                    26. Tranche C:
                                                                 27.
   85% dari total porsi utang Bank DKI akan diubah menjadi       28. 85% of the total debt portion of Bank DKI will be
   menjadi instrumen Mandatory Convertible Bond (“MCB”)               converted into Mandatory Convertible Bond
   yang memiliki opsi konversi menjadi saham baru yang                (“MCB”) instruments which have the option to
   diterbitkan oleh WBP dalam jangka waktu 10 tahun sejak             convert into new shares issued by the WBP within
   WBP mendapatkan seluruh persetujuan korporasi yang                 10 years from the time the WBP obtains all required
   dibutuhkan, dengan nilai nominal saham akan dihitung               corporate approvals, with a nominal value of shares
   berdasarkan volume-weighted average price (VWAP)                   will be calculated based on the volume-weighted
   selama 45 hari sebelum total porsi utang Bank DKI                  average price (VWAP) for 45 days before said total
   tersebut telah secara efektif dikonversi menjadi MCB.              debt portion of Bank DKI is effectively converted
                                                                      into MCB.
                                                                 29.
  Berdasarkan Memori Kasasi terhadap Putusan                     30. Based on the Memorandum of Cassation against
  Pengesahan Perdamaian (Homologasi) Pengadilan                      the Commercial Court Ratification of Peace
  Niaga pada Pengadilan Negeri Jakarta Pusat                         (Homologation) Decision at the Central Jakarta
  No.      497/PDT.SUS-PKPU/2021/PN.NIAGA/JKY.PST                    District       Court       No.       497/PDT.SUS-
  antara PT Bank DKI (Pemohon Kasasi) melawan                        PKPU/2021/PN.NIAGA/JKY. PST between PT
  PT Waskita Beton Precast Tbk (dalam PKPU) (Termohon                Bank DKI (the Petitioner for Cassation) and PT
  Kasasi) No 177/BDKI-WSBP/DS-WS/VII/2022 tanggal 5                  Waskita Beton Precast Tbk (in PKPU) (Respondent
  Juli 2022, PT Bank DKI sebagai pemohon kasasi                      for     Cassation)     No.     177/BDKI-WSBP/DS-
  menyampaikan memori kasasi ke Mahkamah Agung RI                    WS/VII/2022 dated July 5, 2022, PT Bank DKI as
  melalui kepaniteraan Pengadilan Niaga pada Pengadilan              the applicant for cassation submitted a
  Negeri Jakarta Pusat yaitu Permohonan Pembatalan                   memorandum of cassation to the Supreme Court of
  Putusan Pengesahan Perdamaian (Homologasi)                         the Republic of Indonesia through the clerk of
  PT Waskita Beton Precast Tbk (dalam PKPU)                          the Commercial Court at the Central Jakarta District
                                                                     Court, namely the Application for Cancellation
                                                                     Decision on Ratification of Peace (Homologation) of
                                                                     PT Waskita Beton Precast Tbk (in PKPU).
                                                                 31.
  Pada tanggal 30 Juni 2023 dan 31 Desember 2022, saldo          32. As of June 30, 2023 and December 31, 2022,
  pinjaman jangka pendek WBP kepada PT Bank DKI                      the balance of short-term loan of WBP to PT Bank
  masing-masing sebesar Rp671.127.052.202.                           DKI amounting to Rp671,127,052,202, respectively.
                                                                 33.
  Berdasarkan Perjanjian Perdamaian dalam PKPU                   34. Based on the Reconciliation Agreement in PKPU
  fasilitas pinjaman ini direstrukturisasi menjadi Utang             this loan facility was restructured into Long-Term
  Bank        Jangka     Panjang.       Pada      tanggal            Bank Loans and. As of June 30, 2023 and
  30 Juni 2023 dan 31 Desember 2022, saldo pinjaman                  December 31, 2022, the balance of long-term loan
  jangka panjang WBP kepada PT Bank DKI masing-                      of WBP to PT Bank DKI amounting to
  masing         sebesar     Rp83.587.993.910        dan             Rp83,587,993,910,        and     Rp67,527,683,680,
  Rp67.527.683.680 (Catatan 31).                                     respectively (Notes 31)
                                                                 35.
  Entitas Anak – WKR                                                 Subsidiary – WKR

  PT Bank Pembangunan Jawa Barat dan Banten                         PT Bank Pembangunan Jawa Barat dan Banten

  Pada       tanggal   29    September     2022,    WKR             On September 29, 2022, WKR obtained contract
  menandatangani kontrak perjanjian No. 042/TSE-                    agreement No. 042/TSE-KOM/SPPK/IX/2022 with
  KOM/SPPK/IX/2022 dengan PT Bank Pembangunan                       PT Bank Pembangunan Daerah Jawa Barat dan
  Daerah Jawa Barat dan Banten Tbk terkait dengan                   Banten Tbk Tbk related to loan facility amounting to
  fasilitas pinjaman sebesar Rp100.000.000.000. Fasilitas           Rp100,000,000,000. This loan facility is used as
  pinjaman ini merupakah fasilitas modal kerja. Jangka              working capital. The term of the loan is 12 months
  waktu fasilitas pinjaman adalah 12 bulan dengan tingkat           after signing of the contract with interest rate of
  suku bunga 1,75% per tahun. Pinjaman tersebut dijamin             1.75% per annum. The credit facilities are
  dengan deposito ditahan sebesar Rp100.000.000.000.                secured by restricted deposit amounting to
                                                                    Rp100,000,000,000.

  Pada tanggal 30 Juni 2023 dan 31 Desember 2022, saldo             As of June 30, 2023 and December 31, 2022,
  pinjaman WKR kepada PT Bank Pembangunan Jawa                      the balance of loan of WKR to PT Bank
  Barat    dan     Banten     masing-masing    sebesar              Pembangunan Jawa Barat dan Banten amounting
  Rp100.000.000.000.                                                to Rp100,000,000,000, respectively.

                                                          126
Page 130
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

  PT BPR Intidana Sukses Makmur                                     PT BPR Intidana Sukses Makmur

  Pada tanggal 28 Desember 2022, WKR menandatangani                 On December 28, 2022, WKR obtained contract
  kontrak     perjanjian     No.   0114/ISMSME/-SPPK-               agreement No. 0114/ISM-SME/SPPKKMKDL/1222
  KMKDL/1222 denganPT BPR Intidana Sukses Makmur                    with PT BPR Intidana Sukses Makmur related to
  terkait    dengan      fasilitas  pinjaman  sebesar               loan facility amounting to Rp15,000,000,000.
  Rp15.000.000.000. Fasilitas pinjaman ini merupakah                This loan facility is used as working capital with term
  fasilitas modal kerja dengan jangka waktu fasilitas               12 months after signing of the contract with interest
  pinjaman adalah 12 bulan dengan tingkat suku bunga                rate of 16.00% per annum. The credit facilities are
  16,00% per tahun. Pinjaman tersebut dijamin dengan                secured by land square of 1.546 m2 located at
  tanah seluas 1.546 m2 di lokasi proyek pembangunan                project development of Vasaka Solterra.
  Vasaka Solterra.

  Pada      tanggal    28   Desember      2022,    WFPR             On December 28, 2022, WFPR obtained contract
  menandatangani kontrak perjanjian No. 153 dengan                  agreement No. 153 with PT BPR Intidana Sukses
  PT BPR Intidana Sukses Makmur terkait dengan fasilitas            Makmur related to loan facility amounting to
  pinjaman sebesar Rp10.000.000.000. Fasilitas pinjaman             Rp10,000,000,000. This loan facility is used as
  ini merupakah fasilitas modal kerja dengan jangka waktu           working capital with term 12 months after signing of
  fasilitas pinjaman adalah 12 bulan dengan tingkat suku            the contract with interest rate of 16.00% per annum.
  bunga 16,00% per tahun. Pinjaman tersebut dijamin                 The credit facilities are secured by land located at
  dengan tanah di lokasi proyek pembangunan Vasaka                  project development of Vasaka Solterra.
  Solterra.

  Pada tanggal 30 Juni 2023 dan 31 Desember 2022, saldo             As of June 30, 2023 and December 31, 2022, the
  pinjaman Grup kepada PT BPR Intidana Sukses Makmur                balance of loan of Group to PT BPR Intidana
  masing-masing     sebesar    Rp30.000.000.000    dan              Sukses Makmur amounting to Rp30,000,000,000
  Rp18.000.000.000.                                                 and Rp18,000,000,000, respectively.

  Entitas Anak – WKI                                                Subsidiary – WKI

  PT Bank Pembangunan Daerah Jawa Barat dan                         PT Bank Pembangunan Daerah Jawa Barat dan
  Banten Tbk                                                        Banten Tbk

  WKI memperoleh fasilitas dari PT Pembangunan Jawa                 WKI obtained the credit facilities from PT Bank Jawa
  Barat dan Banten sebagai berikut :                                Barat dan Banten as follows:

   a. Fasilitas Kredit KMK Cash Collateral sebesar                  a.    Working Capital Cash Collateral Credit Facility
      Rp15.000.000.000 dengan tingkat suku bunga 0,5%                     amounting to Rp15,000,000,000 with an
      p.a efektif. Jangka waktu fasilitas sampai dengan 11                effective interest rate 0.5% p.a. Facility period
      Januari 2023. Faslitas ini sudah dilunasi pada                      is up to January 11, 2023. This facility has
      tanggal 13 Januari 2023                                             been fully paid on January 13, 2022.
   b. Fasilitas Kredit KMK R/C terbatas sebesar                     b.    KMK R/C Credit Facility Limited amounting to
      Rp38.885.462.165 dengan tingkat suku bunga                          Rp38,885,462,165, with an effective interest
      sebesar 10% p.a efektif. Jangka waktu fasilitas                     rate 10% p.a. Facility period is up to May 20,
      sampai dengan 20 Mei 2023. Faslitas ini sudah                       2023. This facility has been fully paid
      dilunasi pada April 2023                                            in April 2023.

  Pada tanggal 30 Juni 2023 dan 31 Desember 2022, saldo             As of June 30, 2023 and December 31, 2022, the
  pinjaman WKI dari PT Bank Pembangunan Jawa Barat                  balance of loan of WKI from PT Bank Jawa Barat
  dan Banten masing-masing sebesar Nihil dan                        dan Banten amounting Nil and Rp24,923,303,844,
  Rp24.923.303.844.                                                 respectively.




                                                          127
Page 131
                                                                               The original consolidated financial statements included herein are in
                                                                                                                          the Indonesian language.


 PT WASKITA KARYA (PERSERO) TBK                                                         PT WASKITA KARYA (PERSERO) TBK
 DAN ENTITAS ANAK                                                                                   AND ITS SUBSIDIARIES
 CATATAN ATAS LAPORAN KEUANGAN                                                     NOTES TO THE INTERIM CONSOLIDATED
 KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                               FINANCIAL STATEMENTS AS OF JUNE 30, 2023
 31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                      AND DECEMBER 31, 2022 AND FOR THE SIX
 ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                             MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
 (2022 – DIAUDIT) – Lanjutan                                                                 (2022 – AUDITED) – Continued
 (Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                     (Expressed in full Rupiah amount, unless otherwise stated)

24. UTANG LEMBAGA KEUANGAN NON-BANK                                         24. LOANS     FROM               NON-BANK              FINANCIAL
                                                                                INSTITUTION

   Jangka Panjang                                                               Long-Term

                                                                                                  30 Juni/                  31 Desember/
                                                                                               June 30, 2023              December 31, 2022
                                                                                                    Rp                           Rp

    Pihak Berelasi/ Related Parties
      Entitas anak/ Subsidiary - WTR
        PT Sarana Multi Infrastruktur (Persero) (SMI) - WTTR                                   1.582.664.472.160              1.095.861.652.258
        PT Sarana Multi Infrastruktur (Persero) (SMI) - WBW                                    1.143.291.083.303              1.494.032.028.694
        PT Sarana Multi Infrastruktur (Persero) (SMI) - WST                                      813.000.000.000                200.000.000.000
        PT Sarana Multi Infrastruktur (Persero) (SMI) - PBTR                                     368.472.557.775                359.804.074.527
        PT Sarana Multi Infrastruktur (Persero) (SMI) Unit Syariah - WTTR                        292.858.189.410                292.858.189.410
      Sub Jumlah/ Sub Total                                                                    4.200.286.302.648              3.442.555.944.889

    Pihak Ketiga/ Third Parties
      Entitas anak/ Subsidiary - WKR
        PT Tez Capital Finance                                                                     39.178.637.696                29.633.546.093
        Kospin Jasa                                                                                19.000.000.000                             --
      Entitas anak/ Subsidiary - WSE
        PT Indonesia Infrastructure Finance (IIF)                                                108.740.733.498                114.398.150.702
      Entitas anak/ Subsidiary - WTR
        PT Indonesia Infrastructure Finance (IIF) - PBTR                                         988.167.575.327                952.259.326.856
      Sub Jumlah/ Sub Total                                                                    1.155.086.946.521              1.096.291.023.651
    Jumlah/ Total                                                                              5.355.373.249.169              4.538.846.968.540


    Pihak Berelasi                                                               Related Parties

    Entitas anak – WTR                                                           The Subsidiary – WTR

    Kredit Sindikasi WBW                                                         Syndication Loan WBW

    Berdasarkan akta perjanjian kredit sindikasi No. 53,                          Based on the syndicated credit agreement deed
    tanggal 21 Desember 2018, WBW telah menandatangani                            No. 53, dated December 21, 2018, WBW entered
    perjanjian Kredit Sindikasi dengan PT Sarana Multi                            into Loan Syndication with PT Sarana Multi
    Infrastruktur (Persero) dan lembaga keuangan bank                             Infrastruktur (Persero), and other banking financial
    lainnya (Catatan 31).                                                         institution (Note 31).

    Sesuai keputusan kreditur sindikasi untuk partisipasi                         In accordance with the decision of the syndicated
    dalam pembiayaan sindikasi WBW untuk keperluan                                creditors for participation in syndicated financing of
    kredit investasi pembiayaan pembangunan dengan limit                          WBW for credit purposes development financing
    fasilitas kredit investasi sebesar Rp5.360.084.000.000                        investment with an investment credit facility limit of
    dengan jangka waktu maksimum 180 bulan sejak                                  Rp5,360,084,000,000 with a maximum period of
    Penandatangan perjanjian kredit termasuk Grace Period                         180 months from the signing of the credit
    dengan suku bunga masa konstruksi adalah Reference                            agreement including the Grace Period with the
    Rate+.                                                                        construction interest rate is the Reference Rate+.

    Margin eqv 10,50% untuk Tranche 1A dan 1B dan                                 Margin eqv. of 10.50% for Tranche 1A and 1B and
    Reference Rate+ Margin eqv 11,50% untuk Tranche 1C                            Reference Rate+ Margin eqv. of 11.50% for
    dan 1D.                                                                       Tranche 1C and 1D.

    Perjanjian ini telah mengalami perubahan berdasarkan                          The agreement has undergone a change in
    perjanjian kredit sindikasi No. 39 tanggal 26 Februari                        the syndicated credit agreement No. 39 dated
    2019 di Jakarta dengan menyepakati dan menyetujui                             February 26, 2019 in Jakarta by agreeing with and
    memasukkan PT Bank Negara Indonesia (Persero) Tbk                             agreeing to enter PT Bank Negara Indonesia
    sebagai kreditur baru dalam perjanjian kredit dan tanggal                     (Persero) Tbk as the new creditor in the credit
    pembayaran bunga perjanjian kredit untuk fasilitas                            agreement and the date of interest payment of
    Tranche 1A dan fasilitas Tranche 1B dilakukan pada                            the credit agreement for facilities of Tranche 1A
    tanggal 25 pada tiap bulan serta untuk fasilitas Tranche                      and the facilities of Tranche 1B conducted on
    1C dan fasilitas Tranche 1D dilakukan pada tanggal 25                         the 25th of each month as well as for facilities of
    setiap bulan.                                                                 the Tranche 1C and the Tranche 1D facilitiy on
                                                                                  the 25th of each month.

                                                                    128
Page 132
                                                                     The original consolidated financial statements included herein are in
                                                                                                                the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                          AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                      FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                             AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                    MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                        (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)            (Expressed in full Rupiah amount, unless otherwise stated)

   Berdasarkan pemberitahuan pernyataan penundukan diri                 Based on the notice of the statement of
   dari PT Bank Panin Indonesia Tbk sebagai pemberi                     the submission of PT Bank Panin Indonesia Tbk as
   tambahan pinjaman tanggal 23 Agustus 2019 perihal                    an additional lender on August 23, 2019 regarding
   pernyataan pemberi pinjaman untuk tunduk pada seluruh                the lender statement to submit to the entire
   dokumen perjanjian pemberian fasilitas pinjaman kepada               agreement document granting the loan facility to
   debitur dengan jumlah fasilitas tambahan pinjaman yang               debtor with the amount of additional loan facility
   diberikan adalah sebesar Rp750.000.000.000 dan                       given is Rp750,000,000,000 and will be specifically
   secara khusus hanya akan dialokasikan untuk fasilitas                allocated for facilities of Tranche 1A and facilities
   Tranche 1A dan fasilitas Tranche 1B.                                 of Tranche 1B.

   Berdasarkan pemberitahuan pernyataan penundukan diri                 Based on the notice of the statement of
   dari PT Bank Pembangunan Daerah Lampung sebagai                      the submission of PT Bank Pembangunan Daerah
   pemberi tambahan pinjaman tanggal 28 Februari 2020                   Lampung as an additional lender on February 28,
   perihal pernyataan pemberi pinjaman untuk tunduk pada                2020 regarding the lender statement to submit to
   seluruh dokumen perjanjian pemberian fasilitas pinjaman              the entire agreement document granting the loan
   kepada debitur dengan jumlah fasilitas tambahan                      facility to debtor with the amount of additional loan
   pinjaman      yang    diberikan    adalah       sebesar              facility given is Rp100,000,000,000 and will be
   Rp100.000.000.000 dan secara khusus hanya akan                       specifically allocated for facilities for Tranche 1A
   dialokasikan untuk fasilitas Tranche 1A dan fasilitas                and facilities of Tranche 1B.
   Tranche 1B.

   Berdasarkan pemberitahuan pernyataan penundukan diri                 Based on the notice of the statement of
   dari PT Bank ICBC Indonesia sebagai pemberi tambahan                 the submission of PT Bank ICBC Indonesia as an
   pinjaman tanggal 8 April 2020 perihal pernyataan                     additional lender on April 8, 2020 regarding
   pemberi pinjaman untuk tunduk pada seluruh dokumen                   the lender statement to submit to the entire
   perjanjian pemberian fasilitas pinjaman kepada debitur               agreement document granting the loan facility to
   dengan jumlah fasilitas tambahan pinjaman yang                       debtor with the amount of additional loan facility
   diberikan adalah sebesar Rp300.000.000.000 dan                       given is Rp300,000,000,000 and will be specifically
   secara khusus hanya akan dialokasikan untuk fasilitas                allocated for facilities of Tranche 1A and facilities
   Tranche 1A dan fasilitas Tranche 1B.                                 of Tranche 1B.

   Pada tanggal 30 Juni 2023 dan 31 Desember 2022,                     As of June 30, 2023 and December 31, 2022,
   saldo   pinjaman     kredit    investasi  WBW     dari              the balance of WBW investment credit loan from
   PT Sarana Multi Infrastruktur (Persero) adalah sebesar              PT Sarana Multi Infrastruktur (Persero) amounting
   Rp922.522.827.094 dan Rp808.635.092.060.                            to Rp922,522,827,094, and Rp808,635,092,060.

   Pada tanggal 30 Juni 2023 dan 31 Desember 2022,                     As of June 30, 2023 and December 31, 2022,
   saldo pinjaman kredit IDC WBW dari PT Sarana                        the balance of WBW IDC credit loan from
   Multi  Infrastruktur  (Persero)  adalah  sebesar                    PT Sarana Multi Infrastruktur (Persero) amounting
   Rp220.768.256.209 dan Rp287.226.560.198.                            to Rp220,768,256,209, and Rp287,226,560,198.

   Kredit Sindikasi PBTR                                               Syndication Loan PBTR

   Berdasarkan surat persetujuan perubahan fasilitas kredit            Based on the approval letter for changes to
   sindikasi No. SSK/3.2/4251, PBTR menyetujui fasilitas               the syndicated credit facility No. SSK/3.2/4251,
   kredit dari PT Sarana Multi Infrastruktur Syariah. Fasilitas        PBTR approved the credit facilities from PT Sarana
   tersebut berupa fasilitas pembayaran kontraktor sebesar             Multi Infrastruktur Syariah. These facilities are in
   Rp352.000.000.000 dan pembayaran Utang BLU dan                      the form of a contractor payment facility of
   biaya pemliharaan jalan tol sebesar Rp148.000.000.000               Rp352,000,000,000 and payment of BLU
   dengan jangka waktu hingga tahun 2038 dan tingkat bagi              Debt and toll road maintenance costs of
   hasil sebesar Reference Rate + Margin.                              Rp148,000,000,000 with a period of up to 2038 and
                                                                       profit-sharing rate of Reference Rate + Margin.

   Pada tanggal 30 Juni 2023 dan 31 Desember 2022, saldo               As of June 30, 2023 and December 31, 2022,
   pinjaman kredit PBTR dari PT Sarana Multi Infrastruktur             the balance of PBTR credit loan from PT Sarana
   (Persero) adalah sebesar Rp368.752.084.775 dan                      Multi Infrastruktur (Persero) amounting to
   Rp359.804.074.527.                                                  Rp368,752,084,775, and Rp359,804,074,527,
                                                                       respectively.




                                                           129
Page 133
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

   Waskita Trans Jawa Toll Road (WTTR)                               Waskita Trans Jawa Toll Road (WTTR)

   Berdasarkan Akta Notaris No. 3 dan 4 pada tanggal                 Based on Notarial Deed No. 3 and 4 dated October
   5 Oktober 2018 oleh Efran Yuniarto S.H., M.Kn., Notaris           5, 2018, by Efran Yuniarto S.H., M.Kn., in Jakarta,
   di kota Jakarta, WTTR telah menandatangani perjanjian             WTTR entered into Loan Syndication with PT
   Kredit Sindikasi dengan PT Sarana Multi Infrastruktur Unit        Sarana Multi Infrastruktur Unit Usaha Syariah and
   Usaha Syariah dan PT Sarana Multi Infrastruktur. Kedua            PT Sarana Multi Infrastruktur. Both non-bank
   lembaga keuangan non bank tersebut memberikan                     financial institutions are providing a credit facility
   fasilitas kredit maksimum Rp1.293.201.000.000. Fasilitas          with a credit ceiling of Rp1,293,201,000,000.
   pinjaman ini digunakan Perusahaan untuk dana                      The facilities are provided for the development of
   operasional pembangunan jalan tol Pasuruan-                       Pasuruan-Probolinggo Toll Road.
   Probolinggo.

   Pinjaman ini dikenakan bunga sebesar 6,25% pertahun               The loans bear interest of 6.25% per annum for
   untuk Tranche A2 dan 10,5% pertahun untuk Tranche B.              Tranche A2 and 10.5% per annum for Tranche B.

   Pada tanggal 30 Juni 2023 dan 31 Desember 2022, saldo             As of June 30, 2023 and December 31, 2022,
   pinjaman kredit WTTR dari PT Sarana Multi Infrastruktur           the balance of WTTR credit loan from PT Sarana
   (Persero) adalah sebesar Rp1.582.664.472.160 dan                  Multi Infrastruktur (Persero) amounting to
   Rp1.494.032.028.694.                                              Rp1,582,664,472,160 and Rp1,494,032,028,694,
                                                                     respectively.

   Pada tanggal 30 Juni 2023 dan 31 Desember 2022, saldo             As of June 30, 2023 and December 31, 2022,
   pinjaman kredit WTTR kepada PT Sarana Multi                       the balance of WTTR credit loan from
   Infrastruktur (Persero) – Unit Syariah adalah sebesar             PT Sarana Multi Infrastruktur (Persero) – Unit
   Rp292.858.189.410.                                                Syariah amounting to Rp292,858,189,410,
                                                                     respectively.

   Waskita Sriwijaya Tol (WST)                                       Waskita Sriwijaya Tol (WST)

   Berdasarkan Akta notaris No. 50 Nanette Cahyanie, S.H.,           Based on Deed No. 50 of notary Nanette
   tanggal 27 Juni 2022 antara WST dengan                            Cahyanie, S.H., dated June 27, 2022 WST entered
   PT Sarana Multi Infrastruktur (Persero) Tbk perihal               into       Financing        Agreement       with
   Perjanjian    Pembiayaan       ke     WST     sebesar             PT Sarana Multi Infrastruktur amounting
   Rp2.900.000.000.000. Pada 7 November 2022. Pinjaman               Rp2,900,000,000,000. On November 7, 2022. This
   ini dikenakan bunga sebesar JIBOR + margin dengan                 loan bears interest at JIBOR + margin with
   jatuh tempo selama 15 tahun. Pinjaman ini dapat                   a maturity of 15 years. This loan can be used by
   digunakan oleh WST untuk penyelesaian proyek jalan tol            WST for the completion of the KAPB toll road
   KAPB.                                                             project.

   Pada tanggal 30 Juni 2023 dan 31 Desember 2022, saldo             As of June 30, 2023 and December 31, 2022,
   pinjaman kredit WST kepada PT Sarana Multi                        the balance of WST credit loan from PT Sarana
   Infrastruktur     (Persero)       adalah     sebesar              Multi Infrastruktur (Persero) amounting to
   Rp813.000.000.000 dan Rp200.000.000.000.                          Rp813,000,000,000 and Rp200,000,000,000,
                                                                     respectively.

   Pihak Ketiga                                                      Third Parties

   Entitas anak (kepemilikan tidak langsung)– WSE                    The Subsidiary (indirect ownership) – WSE

   •   PT Indonesia Infrastructure Finance (IIF)                     •    PT Indonesia Infrastructure Finance (IIF)

       Pada tanggal 8 Maret 2016, WSE memperoleh                          On March 8, 2016, WSE obtained a long-term
       fasilitas pinjaman berjangka panjang dari IIF sejumlah             loan facility from IIF amounting to
       Rp175.000.000.000 yang terdiri dari fasilitas Kredit               Rp175,000,000,000, which consists of
       Investasi (KI) dan Interest During Construction (IDC)              Investment Credit facility and Interest During
       sebesar Rp10.400.000.000.                                          Construction (IDC) facility amounting to
                                                                          Rp10,400,000,000.

       Pinjaman ini dibayarkan secara cicilan sampai                      The loan is paid in installments until December
       dengan bulan Desember 2026 dengan masa                             2026 with grace period of 12 months.
       tenggang 12 bulan. Fasilitas pinjaman berjangka                    This senior term loan facility was obtained by
       senior ini diperoleh WSE untuk pembiayaan proyek                   WSE to finance the construction of 2X5 MW


                                                          130
Page 134
                                                                     The original consolidated financial statements included herein are in
                                                                                                                the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

       pembangunan pembangkit listrik tenaga mini hydro                     mini-hydro power plant with interest rate of
       2X5 MW dengan tingkat bunga per tahun sebesar                        9.5% per year. WSE appointed PT Bank
       9,5%. WSE menunjuk PT Bank Negara Indonesia                          Negara Indonesia (Persero) Tbk as
       (Persero) Tbk sebagai agen jaminan.                                  a guarantee agent.

       Pinjaman tersebut diatas dijamin dengan piutang                      The loan is collateralized with accounts
       usaha dan aset tetap termasuk fasilitas pembangkit                   receivable and property and equipment
       listrik tenaga hidro (infrastruktur) (Catatan 21).                   including minihydro power generating facility
                                                                            (infrastructure) (Note 21).

       Perjanjian pinjaman mencakup persyaratan tertentu                    The loan agreements include certain
       yang mengharuskan WSE mempertahankan rasio                           requirements for WSE to maintain certain
       keuangan tertentu yang dihitung berdasarkan laporan                  financial ratios calculated based on
       keuangan konsolidasian dan persyaratan lainnya.                      the consolidated financial statements and
                                                                            other requirements.

       Pada tanggal 30 Juni 2023 dan 31 Desember 2022,                      As of June 30, 2023 and December 31, 2022,
       WSE sudah memakai Fasilitas pinjaman tersebut                        the balance of WSE Loan Facilities
       masing – masing sebesar Rp108.740.733.498 dan                        amounting to Rp108,740,733,498, and
       Rp114.398.150.702.                                                   Rp114,398,150,702, respectively.

   Entitas Anak – WTR                                            b     The Subsidiary – WTR

   •   Kredit Sindikasi PBTR                                           •   Syndication Loan PBTR

       Berdasarkan Akta Notaris No. 23 tanggal                             Based on Notarial Deed No.23 dated October
       23 Oktober 2019 oleh Ariani Lakhsmijati Rachim,                     23, 2019 by Ariani Lakhsmijati Rachim S.H.,
       S.H., Notaris di Jakarta, PBTR dan Indonesia                        Notary in Jakarta, PBTR and Indonesia
       Infrastruture Finance mengadakan perjanjian fasilitas               Infrastruture Finance entered into a Cash
       Cash Deficiency Support (CDS) dengan jumlah                         Deficiency Support (CDS) facility agreement
       fasilitas kredit sebesar Rp600.000.000.000. Fasilitas               with a total credit facility amounting to
       kredit ini dikenakan bunga sebesar LPS + 6,75% per                  Rp600,000,000,000. This credit facility bears
       tahun. Dari tingkat suku bunga, Perusahaan wajib                    interest of LPS + 6.75% per annum. From
       membayarkan sebesar 3% per tahun dari baki debet.                   the interest rate, the Company is required to pay
       Adapun tingkat suku bunga yang belum dibayarkan                     3% per annum from the debit balance.
       sebesar LPS + 3,75% per tahun atas saldo debet,                     The unpaid interest rate is LPS + 3.75% per
       akan ditangguhkan pembayarannya dan dikenakan                       annum on the debit balance, payment will be
       bunga majemuk sebesar tingkat suku bunga yang                       deferred and subject to compound interest at
       dihitung pada setiap tanggal pembayaran bunga                       the interest rate calculated on each interest
       sampai dengan fasilitas Kredit Sindikasi lunas. Pada                payment date until the Syndicated Credit facility
       tahun 2020, Perusahaan telah menarik seluruh                        is paid off. In 2020, the Company has drawn
       plafon fasilitas sebesar Rp600.000.000.000.                         down the entire facility ceiling amounting to
                                                                           Rp600,000,000,000.

       Pada tanggal 30 Juni 2023 dan 31 Desember 2022,                     As of June 30, 2023 and December 31, 2022,
       saldo pinjaman kredit investasi PBTR dari IIF masing-               the PBTR investment credit loan balances from
       masing      sebesar      Rp988.167.575.327       dan                IIF amounting to Rp988,167,575,327 and
       Rp952.259.326.856.                                                  Rp952,259,326,856, respectively.

   Entitas Anak – WKR                                                  The Subsidiary – WKR

   PT Tez Capital Finance                                              PT Tez Capital Finance

   Pada     tanggal    15     November     2022,       WKR             On November 15, 2022, WKR entered into a
   menandatangani kontrak perjanjian No. 8 dengan                      contract agreement No. 8 with PT Tez Capital
   PT Tez Capital Finance terkait dengan fasilitas pinjaman            Finance related to loan facility amounting to
   sebesar Rp30.000.000.000. Fasilitas pinjaman ini hanya              Rp30,000,000,000. This loan facility will be used
   dapat digunakan untuk modal kerja dengan jangka waktu               specifically for working capital with term of
   12 bulan dan tingkat suku bunga 20,00% per tahun.                   12 months and interest rate of 20.00% per annum.




                                                          131
Page 135
                                                                                   The original consolidated financial statements included herein are in
                                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                          (Expressed in full Rupiah amount, unless otherwise stated)

   Pinjaman tersebut dijamin dengan sertifkat hak guna                               The credit facilities are secured by building rights
   bangunan No. 00305/Batubulan, Sukawati, Gianyar, Bali                             title located at No. 00305/Batubulan, Sukawati,
   seluas 26.211 m2.                                                                 Gianyar, Bali with an area of 26.211 m2.

   Fasilitas ini mensyaratkan Perusahaan                                untuk        These facilities require the Company to maintain
   memelihara rasio keuangan sebagai berikut:                                        financial ratios as follows:

    a.     Current ratio > 1x                                                         a. Current ratio at > 1x
    b.     Debt to equity ratio < 5x                                                  b. Debt to equity ratio < 5x
    c.     Rasio modal disetor                  terhadap        total   utang         c. Ratio from fully paid capital to total bank loan
           minimal 10%                                                                   minimum 10%

   Pada tanggal 30 Juni 2023 dan 31 Desember 2022,                                   As of June 30, 2023 and December 31, 2022, WKR
   saldo pinjaman kredit WKR dari PT Tez Capital Finance                             credit loan balances from PT Tez Capital Finance
   masing-masing     sebesar   Rp39.178.637.696      and                             amounting       to     Rp39,178,637,696      and
   Rp29.633.546.093.                                                                 Rp29,633,546,093, respectively.

   Koperasi Simpan Pinjam Jasa                                                       Koperasi Simpan Pinjam Jasa

    Pada tanggal 12 Mei 2023, Entitas menandatangani                                 On May 12, 2023, the Company entered debt
    perjanjian No. 86 dengan Koperasi Simpan Pinjam Jasa                             agreement No. 86 with Koperasi Simpan Pinjam
    terkait    dengan     fasilitas  pinjaman    sebesar                             Jasa related to loan facility amounting to
    Rp19.000.000.000. Fasilitas pinjaman ini hanya dapat                             Rp19,000,000,000. This loan facility will be used
    digunakan untuk modal kerja dengan jangka waktu 3                                specifically for working capital with term of 3
    bulan dan tingkat suku bunga 11,00% per tahun.                                   months and interest rate of 11.00% per annum.

    Pada tanggal 30 Juni 2023 dan 31 Desember 2022,                                  As of June 30, 2023 and December 31, 2022, WKR
    saldo pinjaman kredit WKR dari Koperasi Simpan                                   credit loan balances from Koperasi Simpan Pinjam
    Pinjam      Jasa      masing-masing     sebesar                                  Jasa amounting to Rp19,000,000,000 and
    Rp19.000.000.000 and Nihil.                                                      Nil, respectively.

25. UTANG BRUTO SUBKONTRAKTOR                                                   25. GROSS AMOUNT DUE TO SUBCONTRACTORS

    Utang bruto subkontraktor merupakan utang kerja                                Gross amount due to subcontractors represents
    subkontraktor yang belum diberita acarakan, baik dari                          payable for uncertified subcontractor’s working
    subkontraktor atau material yang diakui sebagai prestasi                       progress, either from subcontractor or materials
    karena belum memenuhi syarat pembayaran sesuai                                 which are recognized as progress but have not
    kontrak.                                                                       fulfilled certain payment condition as stated in the
                                                                                   contract.

    Rincian utang bruto subkontraktor jangka pendek                                The details of short-term gross amount due to
    berdasarkan unit kerja adalah sebagai berikut:                                 subcontractors based on business units are as
                                                                                   follows:

                                                                                                             30 Juni/             31 Desember/
                                                                                                          June 30, 2023         December 31, 2022
                                                                                                               Rp                      Rp
     Perusahaan/ The Company
      Divisi Infrastruktur II/ Division Infrastructure II - Jakarta                                        341.014.089.057          585.065.767.111
      Divisi Gedung/ Division Building - Jakarta                                                           276.678.427.622          334.329.442.917
      Divisi Infrastruktur III/ Division Infrastructure III - Jakarta                                      103.094.405.943          186.130.611.941
      Divisi Infrastruktur I/ Division Infrastructure I - Jakarta                                           86.952.949.803          216.593.761.233
      Divisi Overseas/ Division Overseas - Jakarta                                                          17.652.484.700           11.938.824.500
     Sub Jumlah/ Sub-Total                                                                                 825.392.357.125         1.334.058.407.702
     Entitas Anak/ Subsidiary
      PT Waskita Beton Precast Tbk                                                                         123.680.367.317            78.245.691.215
      PT Waskita Karya Infrastruktur                                                                         1.629.744.594             4.268.444.203
     Sub Jumlah/ Sub-Total                                                                                 125.310.111.911            82.514.135.418
     Jumlah/ Total                                                                                         950.702.469.036         1.416.572.543.120




                                                                          132
Page 136
                                                                                  The original consolidated financial statements included herein are in
                                                                                                                             the Indonesian language.


 PT WASKITA KARYA (PERSERO) TBK                                                            PT WASKITA KARYA (PERSERO) TBK
 DAN ENTITAS ANAK                                                                                      AND ITS SUBSIDIARIES
 CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO THE INTERIM CONSOLIDATED
 KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                                  FINANCIAL STATEMENTS AS OF JUNE 30, 2023
 31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                         AND DECEMBER 31, 2022 AND FOR THE SIX
 ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                                MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
 (2022 – DIAUDIT) – Lanjutan                                                                    (2022 – AUDITED) – Continued
 (Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                        (Expressed in full Rupiah amount, unless otherwise stated)

    Rincian utang bruto subkontraktor jangka panjang                               The details of long-term gross amount due to
    adalah sebagai berikut:                                                        subcontractors are as follows:

                                                                                                              30 Juni/            31 Desember/
                                                                                                           June 30, 2023        December 31, 2022
                                                                                                                Rp                     Rp

      Pihak Ketiga/ Third Parties
      Perusahaan/ The Company
       Divisi Gedung/ Division Building - Jakarta                                                           192.362.865.487         222.467.883.802
       Divisi Infrastruktur III/ Division Infrastructure III - Jakarta                                      296.223.793.081         294.823.121.183
       Divisi Infrastruktur II/ Division Infrastructure II - Jakarta                                        162.296.805.617         137.458.400.917
       Divisi Infrastruktur I/ Division Infrastructure I - Jakarta                                           51.943.180.877          70.819.074.740
       Divisi Luar Negeri/ Division Overseas - Jakarta                                                        1.773.871.988             565.117.117
      Jumlah/ Total                                                                                   \     704.600.517.050         726.133.597.759


26. UANG MUKA KONTRAK JANGKA PENDEK                                            26. ADVANCES ON SHORT-TERM CONTRACTS

    Uang muka kontrak jangka pendek merupakan uang                                 Advances on short-term contracts represents
    muka pelaksanaan proyek yang diterima dari pemberi                             advance received from the owners of projects on
    kerja sesuai kontrak pekerjaan konstruksi jangka                               short-term construction contracts. The advances will
    pendek; uang muka tersebut akan dikompensasikan                                be offset with the progress of work and terms of
    dengan progress pekerjaan dan termin pembayaran                                payment in accordance with the progress of work.
    sesuai dengan progress lapangan.

    Rincian uang muka kontrak jangka pendek berdasarkan                            The details of advances on short-term contracts
    unit kerja adalah sebagai berikut:                                             based on business unit are as follows:

                                                                                                        30 Juni/                31 Desember/
                                                                                                     June 30, 2023            December 31, 2022
                                                                                                          Rp                         Rp
    Perusahaan/ The Company
     Divisi Gedung/ Division Building - Jakarta                                                           389.513.449.933           347.988.270.282
     Divisi Infrastruktur I/ Division Infrastructure I - Jakarta                                           51.355.846.360            47.309.365.759
     Divisi Infrastruktur II/ Division Infrastructure II - Jakarta                                         33.883.057.192             2.012.207.303
     Divisi Infrastruktur III/ Division Infrastructure III - Jakarta                                       49.078.690.503            34.404.017.891
    Sub Jumlah/ Sub-Total                                                                                 523.831.043.988           431.713.861.235
    Entitas Anak/ Subsidiaries
     PT Waskita Karya Realty                                                                              309.553.187.895           305.365.577.373
     PT Waskita Beton Precast Tbk                                                                          56.766.276.684            52.739.177.698
     PT Waskita Karya Infrastruktur Tbk                                                                     7.666.280.315             6.438.779.926
    Sub Jumlah/ Sub-Total                                                                                 373.985.744.894           364.543.534.997
    Jumlah/ Total                                                                                         897.816.788.882           796.257.396.232


    Uang muka kontrak jangka pendek berdasarkan pihak-                             Advances on short-term contracts based on
    pihak pemberi kerja sebagai berikut:                                           the owners of the projects are as follows:

                                                                                                        30 Juni/                31 Desember/
                                                                                                     June 30, 2023            December 31, 2022
                                                                                                          Rp                         Rp
    Pihak Berelasi/ Related Parties
     Lain-lain/ Others (di bawah/ below Rp 20 Milyar/ Billion )                                             1.366.379.858              1.366.379.858
    Sub Jumlah/ Sub-Total                                                                                   1.366.379.858              1.366.379.858
    Pihak Ketiga/ Third Parties
     Kementerian Pekerjaan Umum dan Perumahan Rakyat/
      The Ministry of Public Works and Housing                                                            337.180.200.823           248.491.933.103
     PT Sintesis Kreasi Bersama                                                                            70.000.000.000                         --
     Pemerintah Daerah/ District Governments                                                               25.647.197.501                         --
     Kementerian Perhubungan/ The Ministry of Transportation                                               22.093.193.633            15.294.648.648
     Crown Prince Court (CPC)                                                                               1.700.644.170             1.700.644.170
     Lain-lain/ Others (di bawah/ below Rp 20 Milyar/ Billion )                                           439.829.172.897           529.403.790.453
    Sub Jumlah/ Sub-Total                                                                                 896.450.409.024           794.891.016.374
    Jumlah/ Total                                                                                         897.816.788.882           796.257.396.232



                                                                         133
Page 137
                                                                          The original consolidated financial statements included herein are in
                                                                                                                     the Indonesian language.


 PT WASKITA KARYA (PERSERO) TBK                                                   PT WASKITA KARYA (PERSERO) TBK
 DAN ENTITAS ANAK                                                                             AND ITS SUBSIDIARIES
 CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
 KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                         FINANCIAL STATEMENTS AS OF JUNE 30, 2023
 31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                AND DECEMBER 31, 2022 AND FOR THE SIX
 ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                       MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
 (2022 – DIAUDIT) – Lanjutan                                                           (2022 – AUDITED) – Continued
 (Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                (Expressed in full Rupiah amount, unless otherwise stated)

    Uang muka pada WKR, entitas anak, merupakan uang                       Advances to WKR, a subsidiary, represent
    muka yang diterima atas hasil penjualan unit apartemen.                advances received from the sale of apartment units.

    Uang muka pada WBP, entitas anak, merupakan uang                       Advances to WBP, a subsidiary, represent advances
    muka yang diterima atas pesanan beton precast dari                     received on precast concrete orders from
    pelanggan.                                                             customers.

    Uang muka pada WKI, entitas anak, merupakan uang                       Advances to WKI, a subsidiary, represent advances
    muka yang diterima atas hasil penjualan baja.                          received from the sale of steel.

27. BIAYA YANG MASIH HARUS DIBAYAR                                    27. ACCRUED EXPENSES

                                                    30 Juni/            31 Desember/
                                                 June 30, 2023        December 31, 2022
                                                      Rp                     Rp
    Beban Bunga                                    871.738.450.789         275.053.586.195                                      Interest Expenses
    Beban Umum                                     394.285.490.240         530.973.539.337                                     General Expenses
    Beban Bunga Obligasi                           243.775.802.565          50.387.023.441                              Bond Interest Expenses
    Beban Pegawai                                   80.707.442.594         112.273.840.804                                  Employee Expenses
    Beban Kantor                                    32.742.763.948          44.652.713.273                                        Office Expenses
    Utang Bagi Hasil                                10.866.732.917          10.866.732.917                               Profit Sharing Payables
    Beban Gedung                                     3.809.139.956           2.875.920.253                                    Building Expenses
    Beban Operasional Proyek                           937.548.639             694.280.253                          Project Operational Charges
    Lain-lain                                        6.522.112.385          10.173.344.798                                                  Others
    Jumlah                                        1.645.385.484.033      1.037.950.981.271                                                  Total


   Biaya yang masih harus dibayar untuk beban operasional                   Accrued expenses for projects operational charges
   proyek adalah utang kepada pihak ketiga sehubungan                       represent payables to third parties in line with
   dengan kegiatan operasional proyek Perusahaan, beban                     the project operations of the Group are for building
   gedung, beban kantor, beban pegawai dan beban umum.                      expenses, office expenses, employee expense and
                                                                            general expenses.

   Pada tanggal 30 Juni 2023, beban bunga obligasi yang                     As of June 30, 2023, accrued bonds interest
   masih harus dibayar merupakan beban bunga atas                           expenses represent interest expenses on
   obligasi Perusahaan yang belum dibayar sebagai berikut:                  the Group’s bonds that were not yet paid as follows:

    •    Periode tanggal 23 – 30 Juni 2023 untuk obligasi                   •    Period of June 23 – 30, 2023 for bonds year
         tahun 2018 Berkelanjutan III Tahap II Seri B;                           2018 Shelf III Phase II Tranche B;
    •    Periode tanggal 28 – 30 Juni 2023 untuk obligasi                   •    Period of June 28 – 30, 2023 for bonds year
         tahun 2018 Berkelanjutan III Tahap III Seri B;                          2018 Shelf III Phase III Tranche B;
    •    Periode tanggal 16 – 30 Juni 2023 untuk obligasi                   •    Period of June 16 – 30, 2023 for Bonds year
         tahun 2019 Berkelanjutan III Tahap IV;                                  2019 Shelf III Phase IV;
    •    Periode tanggal 6 – 30 Juni 2023 untuk obligasi tahun              •    Period of June 6 – 30, 2023 for Bonds year 2020
         2020 Berkelanjutan IV Tahap I;                                          Shelf IV Phase I;
    •    Periode tanggal 24 – 30 Juni 2023 untuk Obligasi III               •    Period of June 24 – 30, 2023 for Bonds III year
         tahun 2021 ;                                                            2021;
    •    Periode tanggal 12 – 30 Juni 2023 untuk Obligasi IV                •    Period of June 12 – 30, 2023 for Bonds IV year
         tahun 2022 ;                                                            2022;
    •    Periode tanggal 5 – 30 Juni 2023 untuk obligasi tahun              •    Period of June 5 – 30, 2023 for Bonds year 2019
         2019 Berkelanjutan I Tahap I (Entitas Anak –                            Shelf     I    Phase      I   (Subsidiaries   –
         PT Waskita Beton Precast Tbk); dan                                      PT Waskita Beton Precast Tbk); and
    •    Periode tanggal 30 Juni 2023 untuk obligasi tahun                  •    Period of June 30, 2023 for Bonds year 2019
         2019 Berkelanjutan I Tahap II (Entitas Anak –                           Shelf    I    Phase      II   (Subsidiaries   –
         PT Waskita Beton Precast Tbk).                                          PT Waskita Beton Precast Tbk).

   Pada tanggal 30 Juni 2023, bagi hasil yang masih harus                   As of June 30, 2023, accrued profit sharing
   dibayar merupakan bagi hasil atas sukuk Perusahaan                       payables represent profit sharing on the Company’s
   yang belum dibayar sebagai berikut:                                      sukuk that were not yet paid as follows:

    •    Periode tanggal 6 – 30 Juni 2023 untuk Sukuk                       •    Period of June 6 – 30, 2023 for Sukuk
         Mudharabah I tahun 2022.                                                Mudharabah I year 2022.



                                                             134
Page 138
                                                                              The original consolidated financial statements included herein are in
                                                                                                                         the Indonesian language.


 PT WASKITA KARYA (PERSERO) TBK                                                      PT WASKITA KARYA (PERSERO) TBK
 DAN ENTITAS ANAK                                                                                AND ITS SUBSIDIARIES
 CATATAN ATAS LAPORAN KEUANGAN                                                  NOTES TO THE INTERIM CONSOLIDATED
 KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                            FINANCIAL STATEMENTS AS OF JUNE 30, 2023
 31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                   AND DECEMBER 31, 2022 AND FOR THE SIX
 ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                          MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
 (2022 – DIAUDIT) – Lanjutan                                                              (2022 – AUDITED) – Continued
 (Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                  (Expressed in full Rupiah amount, unless otherwise stated)

   Pada tanggal 31 Desember 2022, beban bunga obligasi                          As of December 31, 2022, accrued bonds interest
   yang masih harus dibayar merupakan beban bunga atas                          expenses represent interest expenses on
   obligasi Perusahaan yang belum dibayar sebagai berikut:                      the Group’s bonds that were not yet paid as follows:

    •   Periode tanggal 23 – 31 Desember 2022 untuk                            •      Period of December 23 – 31, 2022 for bonds
        obligasi tahun 2018 Berkelanjutan III Tahap II Seri B;                        year 2018 Shelf III Phase II Tranche B;
    •   Periode tanggal 28 – 31 Desember 2022 untuk                            •      Period of December 28 – 31, 2022 for bonds
        obligasi tahun 2018 Berkelanjutan III Tahap III Seri B;                       year 2018 Shelf III Phase III Tranche B;
    •   Periode tanggal 16 – 31 Desember 2022 untuk                            •      Period of December 16 – 31, 2022 for Bonds
        obligasi tahun 2019 Berkelanjutan III Tahap IV;                               year 2019 Shelf III Phase IV;
    •   Periode tanggal 6 – 31 Desember 2022 untuk obligasi                    •      Period of December 6 – 31, 2022 for Bonds year
        tahun 2020 Berkelanjutan IV Tahap I;                                          2020 Shelf IV Phase I;
    •   Periode tanggal 24 – 31 Desember 2022 untuk                            •      Period of December 24 – 31, 2022 for Bonds III
        Obligasi III tahun 2021 ;                                                     year 2021;
    •   Periode tanggal 12 – 31 Desember 2022 untuk                            •      Period of December 12 – 31, 2022 for Bonds IV
        Obligasi IV tahun 2022 ;                                                      year 2022;
    •   Periode tanggal 5 – 31 Desember 2022 untuk obligasi                    •      Period of December 5 – 31, 2022 for Bonds year
        tahun 2019 Berkelanjutan I Tahap I (Entitas Anak –                            2019 Shelf I Phase I (Subsidiaries –
        PT Waskita Beton Precast Tbk); dan                                            PT Waskita Beton Precast Tbk); and
    •   Periode tanggal 30 – 31 Desember 2022 untuk                            •      Period of December 30 – 31, 2022 for Bonds
        obligasi tahun 2019 Berkelanjutan I Tahap II (Entitas                         year 2019 Shelf I Phase II (Subsidiaries –
        Anak – PT Waskita Beton Precast Tbk).                                         PT Waskita Beton Precast Tbk).

   Pada tanggal 31 Desember 2022, bagi hasil yang masih                         As of December 31, 2022, accrued profit sharing
   harus dibayar merupakan bagi hasil atas sukuk                                payables represent profit sharing on the Company’s
   Perusahaan yang belum dibayar sebagai berikut:                               sukuk that were not yet paid as follows:

    •   Periode tanggal 6 – 31 Desember 2022 untuk Sukuk                       •      Period of December 6 – 31, 2022 for Sukuk
        Mudharabah I tahun 2022.                                                      Mudharabah I year 2022.

    Pembayaran bunga atas semua obligasi yang diterbitkan                       Interest payments on all bonds issued by
    Perusahaan dibayarkan setiap tiga bulanan sesuai                            the Group are paid quarterly according to
    dengan tanggal penerbitan masing-masing obligasi.                           the issuance date of each bond.

28. SURAT UTANG JANGKA MENENGAH                                          28. MEDIUM TERM NOTES

                                                            30 Juni/                 31 Desember/
                                                         June 30, 2023             December 31, 2022
                                                              Rp                          Rp

   Surat Utang Jangka Menengah                                                                                               Medium Term Notes
    PT Waskita Karya Realty                                 725.000.000.000             725.000.000.000                  PT Waskita Karya Realty
   Dikurangi: Bagian yang Jatuh Tempo dalam Satu Tahun    (250.000.000.000)           (250.000.000.000)                         Less: Short-Term
   Jumlah                                                  475.000.000.000             475.000.000.000                                       Total


   PT Waskita Karya Realty (WKR)                                               PT Waskita Karya Realty (WKR)

   Pada tanggal 24 Agustus 2022, WKR menandatangani                            On August 24, 2022, WKR entered into contract
   kontrak perjanjian No. 17 untuk menerbitkan Surat Utang                     agreement No. 17 to issue Medium Term Notes III
   Jangka Menengah (Medium Term Notes III Waskita Karya                        Waskita Karya Realty Tahun 2022 with facility
   Realty Tahun 2022) dengan fasilitas pinjaman sebesar                        amounting to Rp475,000,000,000. This loan facility
   Rp475.000.000.000. Fasilitas pinjaman ini diterbitkan                       bears 12.1% annual interest rate. This loan facility will
   dengan tingkat bunga 12,1% per tahun. Fasilitas                             be used for working capital and/or refinancing of debt.
   peminjaman ini digunakan untuk modal kerja dan/atau                         The issuance of Medium Term Notes was rated by
   pembayaran kembali utang usaha. Penerbitan Surat                            PT Pemeringkat Efek Indonesia with BB (idn) rate.
   Utang Jangka menengah ini memperoleh hasil                                  The term of this loan facilty is 36 months.
   pemeringkatan dari PT Pemeringkat Efek Indonesia
   dengan peringkat BB (idn). Jangka waktu fasilitas
   pinjaman adalah 36 bulan.




                                                               135
Page 139
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

  Pada tanggal 8 Juli 2022, WKR menandatangani kontrak              On July 8, 2022, WKR entered into contract
  perjanjian No. 05 untuk menerbitkan Surat Utang Jangka            agreement No. 05 to issue Medium Term Notes IV
  Menengah (Medium Term Notes IV Waskita Karya Realty               Waskita Karya Realty Tahun 2022 with facility
  Tahun 2022) dengan fasilitas pinjaman sebesar                     amounting to Rp85,000,000,000. This loan facility
  Rp85.000.000.000. Fasilitas pinjaman ini diterbitkan              bears 11.41% annual interest rate. This loan facility
  dengan tingkat bunga 11,41% per tahun. Fasilitas                  will be used for working capital and/or refinancing of
  peminjaman ini digunakan untuk modal kerja dan/atau               Medium Term Notes PT Waskita Realty Tahun 2021.
  pembayaran kembali Medium Term Notes PT Waskita                   The issuance of Medium-Term Notes was rated by
  Realty Tahun 2021. Penerbitan Surat Utang Jangka                  PT Pemeringkat Efek Indonesia with BB (idn) rate.
  menengah ini memperoleh hasil pemeringkatan dari PT               The term of this loan facility is 370 days.
  Pemeringkat Efek Indonesia dengan peringkat BB (idn).
  Jangka waktu fasilitas pinjaman adalah 370 hari.

  WKR telah menunjuk Wali Amanat sebagai perantara                  WKR engaged Trustees to act as the intermediary
  WKR dengan pemegang MTN. Adapun wali amanat untuk                 between WKR and MTN holders. The Trustees for
  MTN adalah PT Bank Pembangunan Daerah Jawa Barat                  MTN issuance is PT Bank Pembangunan Daerah
  (Persero) Tbk.                                                    Jawa Barat (Persero) Tbk.

  PT Waskita Fim Perkasa Realti (WFPR)                              PT Waskita Fim Perkasa Realti (WFPR)

  Pada tanggal 8 Juli 2022, WFPR menandatangani kontrak             On July 8, 2022, the Company entered into contract
  perjanjian No. 07 untuk menerbitkan Surat Utang Jangka            agreement No. 07 to issue Medium Term Notes II
  Menengah (Medium Term Notes II Waskita Fim Perkasa                Waskita Fim Perkasa Realti Tahun 2022 with facility
  Realti Tahun 2022) dengan fasilitas pinjaman sebesar              amounting to Rp165,000,000,000.
  Rp165.000.000.000.
  Fasilitas peminjaman ini digunakan untuk refinancing              This loan facility bears 13.06% annual interest rate.
  Medium Term Notes PT Waskita Fim Perkasa Realti                   This loan facility will be used for refinancing of
  Tahun 2021. Penerbitan Surat Utang Jangka menengah                Medium Term Notes PT Waskita Fim Perkasa Realti
  ini memperoleh hasil pemeringkatan dari PT Pemeringkat            Tahun 2021. The issuance of Medium Term Notes
  Efek Indonesia dengan peringkat BB (idn). Jangka waktu            was rated by PT Pemeringkat Efek Indonesia with BB
  fasilitas pinjaman adalah 370 hari.                               (idn) rate. The term of this loan facilty is 370 days.

  WFPR telah menunjuk Wali Amanat sebagai perantara                 WFPR engaged Trustees to act as the intermediary
  WFPR dengan pemegang MTN. Adapun wali amanat                      between WFPR and MTN holders. The Trustees for
  untuk MTN adalah PT Bank Pembangunan Daerah Jawa                  MTN issuance is PT Bank Pembangunan Daerah
  Barat (Persero) Tbk.                                              Jawa Barat (Persero) Tbk.

  Berdasarkan syarat-syarat dan kondisi-kondisi dari                Under the terms and conditions of these long-term
  perjanjian sehubungan dengan kewajiban jangka panjang             obligation, WKR are subjects to various covenants as
  tersebut, WKR harus mematuhi pembatasan antara lain               follow as obtaining debt with new issuance of debts
  memperoleh pinjaman dengan cara penerbitan utang baru             with others method which is have senior level than
  dengan cara lainnya yang mempunyai batasan lebih tinggi           MTN before issuance of MTN, guarantee and make
  dari penerbitan MTN sebelum adanya MTN, menjamin                  expense from assets within 50% from total asset of
  atau membebani aset WKR lebih besar dari 50% dari total           WKR, issued guarantee of WKR except concerned of
  aset WKR, memberikan jaminan WKR kecuali untuk                    WKR and subsidiary operation, mergers and
  kegiatan usaha dan anak WKR,               melakukan              acquisition with others Company which have a bad
  penggabungan, pengambilalihan dengan WKR lain yang                influence to going concern, change majority
  mempunyai dampak negatif terhadap kelangsungan                    composition, sell and disposal of fixed asset more
  usaha, merubah komposisi pemegang saham mayoritas,                than 50% from total asset within 1 current year
  menjual atau mengalihkan aset tetap WKR sebanyak                  period, giving another loan to other third parties
  lebih dari 50% dari total aset dalam 1 tahun periode              except regarding to business facility development,
  berjalan, memberikan pinjaman kepada pihak lain kecuali           employees loan, and cooperation, changing main
  berkaitan dengan sehubungan pembangunan fasilitas                 business activity, and reducing of authorized, issued,
  usaha, pinjaman karyawan, dan koperasi, mengubah                  and fully paid capital of WKR.
  bentuk usaha WKR, dan mengurangi modal dasar,
  ditempatkan, dan modal dasar WKR.




                                                          136
Page 140
                                                                                      The original consolidated financial statements included herein are in
                                                                                                                                 the Indonesian language.


 PT WASKITA KARYA (PERSERO) TBK                                                               PT WASKITA KARYA (PERSERO) TBK
 DAN ENTITAS ANAK                                                                                         AND ITS SUBSIDIARIES
 CATATAN ATAS LAPORAN KEUANGAN                                                           NOTES TO THE INTERIM CONSOLIDATED
 KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                                     FINANCIAL STATEMENTS AS OF JUNE 30, 2023
 31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                            AND DECEMBER 31, 2022 AND FOR THE SIX
 ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                                   MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
 (2022 – DIAUDIT) – Lanjutan                                                                       (2022 – AUDITED) – Continued
 (Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                            (Expressed in full Rupiah amount, unless otherwise stated)

29. UTANG OBLIGASI                    –     BERSIH        DAN     SUKUK           29. BOND PAYABLE                    –     NET        AND        SUKUK
    MUDHARABAH                                                                        MUDHARABAH

                                                               30 Juni/              31 Desember/
                                                            June 30, 2023          December 31, 2022
                                                                 Rp                       Rp
    Nominal                                                 10.686.695.822.576       10.678.315.860.482                                          Face Value
    Biaya Emisi Obligasi                                       (25.197.515.556)         (25.688.628.397)                                 Bond Issuance Cost
    Akumulasi Amortisasi                                          7.766.525.145            6.759.595.384                            Accumulated Amortization
    Dikurangi: Bagian yang Jatuh Tempo dalam Satu Tahun     (6.566.269.921.111)      (5.203.935.622.504)                               Less: Current Maturity
    Bagian Jangka Panjang                                    4.102.994.911.054        5.455.451.204.965                                Non - Current Portion
    Sukuk Mudharabah                                         1.148.100.000.000        1.148.100.000.000                                  Sukuk Mudharabah
    Biaya Emisi Sukuk Mudharabah                                (3.336.771.580)          (3.336.771.580)                     Sukuk Mudharabah Issuance Cost
    Akumulasi Amortisasi                                            199.689.103              142.642.766                            Accumulated Amortization
    Sub Jumlah                                               1.144.962.917.523        1.144.905.871.186                                            Sub-Total
    Jumlah                                                  5.247.957.828.577        6.600.357.076.151                                                 Total

    Biaya Emisi Obligasi                                        28.534.287.136           29.025.399.977                                  Bonds Issuance Cost
    Dikurangi: Akumulasi Amortisasi                             (7.966.214.248)          (6.902.238.150)                       Less: Accumulated Amortization
    Biaya Emisi Obligasi Belum Diamortisasi                     20.568.072.888           22.123.161.827                    Unamortized Bond Issuance Costs


    Obligasi dan Sukuk yang diterbitkan Perusahaan:                                     Bonds and Sukuk issued by the Company:

    a. Berdasarkan Akta Perubahan IV (Keempat)                                          a. Based on the Deed of Amendment IV (Fourth)
       Perjanjian Perwaliamanatan Obligasi IV Waskita                                      Trusteeship Agreement Deed Shelf Registration
       Karya Tahun 2022 No. 47 pada tanggal 22 April 2022                                  Bond       IV      Waskita      Karya     2022
       yang dibuat di hadapan Notaris Ashoya Ratam, S.H.,                                  No. 47 dated April 22, 2022 from Notary Ashoya
       m.Kn., Perusahaan telah menerbitkan Obligasi IV                                     Ratam, S.H., M.Kn., the Company issued Shelf
       Waskita Karya Tahun 2022 dengan jumlah pokok                                        Registration Bond IV Waskita Karya Year 2022
       obligasi sebesar Rp2.127.300.000.000 yang dibagi                                    amounting to Rp2,127,300,000,000 which
       dalam dua seri:                                                                     consists of two tranches:

         •     Seri A dengan tingkat bunga tetap 6,65% per                                   • Tranche A with fixed interest rate of 6.65%
               tahun dengan nilai Rp658.000.000.000.                                            p.a. with face value of Rp658,000,000,000.

         •     Seri B dengan tingkat bunga tetap 7,55% per                                   • Tranche B with fixed interest rate of
               tahun dengan nilai Rp1.469.300.000.000.                                          7.55%    p.a   with  face  value  of
                                                                                                Rp1,469,300,000,000.

         Utang obligasi ini mensyaratkan Perusahaan untuk                                    The Bonds payable require the Company to
         mempertahankan rasio keuangan sebagai berikut:                                      maintain financial ratios as follows:

         •    Current ratio tidak kurang dari 0,5 : 1 (nol koma                              • Current ratio is not less than 0.5 : 1 (zero point
              lima berbanding satu);                                                            five is to one);
         •    Debt to Equity a.d interest bearing debt tidak lebih                           • Debt to Equity a.d interest bearing debt is no
              dari 5 : 1 (lima berbanding satu);                                                more than 5 : 1 (five is to one); and
         •    Earning Before Interest, Tax, Depreciation and                                 • Earnings Before Interest, Tax, Depreciation
              Amortization (EBITDA) dengan Beban Bunga                                          and Amortization (EBITDA) to Interest
              Pinjaman tidak kurang dari 0,8 : 1 (nol koma                                      Expense is not less than 0.8 : 1 (zero point
              delapan berbanding satu).                                                         eight is to one).

             Obligasi ini dijamin dengan Penjaminan Pemerintah                                  These bonds are guaranteed by Govermnent
             berdasarkan Peraturan Menteri Keuangan Republik                                    Guarantee based on Regulation of
             Indonesia Nomor 211/PMK.08/2020 tanggal 22                                         The Minister of Finance of Republic Indonesia
             Desember 2020 dan Surat Persetujuan Prinsip                                        Number 211/PMK.08/2020 dated December
             Penjaminan       Pemerintah     dari  Kementerian                                  22, 2020 and Letter of Approval for
             Keuangan         Republik     Indonesia   Nomor                                    Government Guarantee Principles from
             S-159/PR/2022 tanggal 8 April 2022.                                                The Ministry of Finance of Republic Indonesia
                                                                                                Number S-159/PR/2022 dated April 8, 2022.



                                                                        137
Page 141
                                                                     The original consolidated financial statements included herein are in
                                                                                                                the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                          AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                      FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                             AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                    MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                        (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)            (Expressed in full Rupiah amount, unless otherwise stated)

       Pada tanggal 28 April 2022 Perusahaan memperoleh                        On April 28, 2022, the Company obtained an
       pernyataan efektif dari OJK atas Atas Pernyataan                        effective statement from the OJK on
       Pendaftaran Dalam Rangka Penawaran Umum                                 the Registration Statement for the Public
       Obligasi IV PT Waskita Karya Tahun 2022 Dan                             Offering of PT Waskita Karya Bonds IV Year
       Penawaran     Umum       Sukuk    Mudharabah    I                       2022 and the Public Offering of Sukuk
       berdasarkan Surat Keputusan No. S-75/D.04/2022.                         Mudharabah I based on Decree No. S-
                                                                               75/D.04/2022.

   b. Berdasarkan Akta Perubahan IV (Keempat)                          b. Based on the Deed of Amendment IV (Fourth)
      Perjanjian Perwaliamanatan Sukuk Mudharabah I                       Trusteeship Agreement Deed Shelf Registration
      Waskita Karya Tahun 2022 No. 50 pada tanggal                        Sukuk Mudharabah I Waskita Karya 2022 No.
      22 April 2022 yang dibuat di hadapan Notaris Ashoya                 50 dated April 22, 2022 from Notary Ashoya
      Ratam, S.H., m.Kn., Perusahaan telah menerbitkan                    Ratam, S.H., M.Kn., the Company issued Shelf
      Sukuk Mudharabah Waskita Karya Tahun 2022                           Registration Sukuk Mudharabah I Waskita
      dengan jumlah pokok sebesar Rp1.148.100.000.000                     Karya      Year    2022     amounting      to
      yang dibagi dalam dua seri:                                         Rp1,148,100,000,000 which consists of two
                                                                          tranches:

       •   Seri A dengan tingkat bagi hasil tetap 6,65% per                • Tranche A with profit sharing rate of 6.65%
           tahun dengan nilai Rp383.000.000.000.                              p.a. with face value of Rp383,000,000,000.
       •   Seri B dengan tingkat bagi hasil tetap 7,55% per                • Tranche B with profit sharing rate of 7.55%
           tahun dengan nilai Rp765.100.000.000.                              p.a with face value of Rp765,100,000,000.

       Utang sukuk ini mensyaratkan Perusahaan untuk                       Sukuk payables require the Company to
       mempertahankan rasio keuangan sebagai berikut:                      maintain financial ratios as follows:

       •   Current ratio tidak kurang dari 0,5 : 1 (nol koma               •    Current ratio is not less than 0.5 : 1 (zero
           lima berbanding satu);                                               point five is to one);
       •   Debt to Equity a.d interest bearing debt tidak lebih            •    Debt to Equity a.d interest bearing debt is no
           dari 5 : 1 (lima berbanding satu);                                   more than 5 : 1 (five is to one); and
       •   Earning Before Interest, Tax, Depreciation and                  •    Earnings Before Interest, Tax, Depreciation
           Amortization (EBITDA) dengan Beban Bunga                             and Amortization (EBITDA) to Interest
           Pinjaman tidak kurang dari 0,8 : 1 (nol koma                         Expense is not less than 0.8 : 1 (zero point
           delapan berbanding satu).                                            eight is to one).

       Sukuk ini dijamin dengan Penjaminan Pemerintah                      These sukuk are guaranteed by Govermnent
       berdasarkan Peraturan Menteri Keuangan Republik                     Guarantee based on Regulation of The Minister
       Indonesia    Nomor    211/PMK.08/2020 tanggal                       of Finance of Republic Indonesia Number
       22 Desember 2020 dan Surat Persetujuan Prinsip                      211/PMK.08/2020 dated December 22, 2020
       Penjaminan Pemerintah dari Kementerian Keuangan                     and Letter of Approval for Government
       Republik Indonesia Nomor S-159/PR/2022 tanggal 8                    Guarantee Principles from the Ministry of
       April 2022. Pada tanggal 28 April 2022 Perusahaan                   Finance of Republic Indonesia Number S-
       memperoleh pernyataan efektif dari OJK atas Atas                    159/PR/2022 dated April 8, 2022. On April 28,
       Pernyataan Pendaftaran Dalam Rangka Penawaran                       2022, the Company obtained an effective
       Umum Obligasi IV PT Waskita Karya Tahun 2022                        statement from the OJK on the Registration
       Dan Penawaran Umum Sukuk Mudharabah I                               Statement for the Public Offering of PT Waskita
       berdasarkan Surat Keputusan No. S-75/D.04/2022.                     Karya Bonds IV Year 2022 and the Public
                                                                           Offering of Sukuk Mudharabah I based on
                                                                           Decree No. S-75/D.04/2022.

   c. Berdasarkan Akta Perubahan II (Kedua) Perjanjian                 c. Based on the Deed of Amendment II (Second)
      Perwaliamanatan Obligasi III Waskita Karya Tahun                    Trusteeship Agreement Deed Shelf Registration
      2021 No. 36 pada tanggal 16 September 2021 yang                     Bond III Waskita Karya 2021 No. 36 dated
      dibuat di hadapan Notaris Ashoya Ratam, S.H.,                       September 16, 2021 from Notary Ashoya
      M.Kn., Perusahaan telah menerbitkan Obligasi III                    Ratam, S.H., M.Kn., the Company issued Shelf
      Waskita Karya Tahun 2021 dengan jumlah pokok                        Registration Bond III Waskita Karya Year 2021
      obligasi sebesar Rp1.773.000.000.000 yang dibagi                    amounting to Rp1,773,000,000,000 which
      dalam dua seri:                                                     consists of two tranches:

       •   Seri A dengan tingkat bunga tetap 6,10% per                     •    Tranche A with fixed interest rate of 6.10%
           tahun dengan nilai Rp722.000.000.000.                                p.a. with face value of Rp722,000,000,000

                                                           138
Page 142
                                                                     The original consolidated financial statements included herein are in
                                                                                                                the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                          AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                      FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                             AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                    MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                        (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)            (Expressed in full Rupiah amount, unless otherwise stated)

       •   Seri B dengan tingkat bunga tetap 6,80% per                     •    Tranche B with fixed interest rate of 6.80%
           tahun dengan nilai Rp1.051.000.000.000.                              p.a with face value of Rp1,051,000,000,000.

       Utang obligasi ini mensyaratkan Perusahaan untuk                    Bonds payable require the Company to maintain
       mempertahankan rasio keuangan sebagai berikut:                      financial ratios as follows:

       •   Current ratio tidak kurang dari 0,5 : 1 (nol koma               •    Current ratio is not less than 0.5 : 1 (zero
           lima berbanding satu);                                               point five is to one);
       •   Debt to Equity a.d interest bearing debt tidak lebih            •    Debt to Equity a.d interest bearing debt is no
           dari 5 : 1 (lima berbanding satu); dan                               more than 5 : 1 (five is to one); and
       •   Earning Before Interest, Tax, Depreciation and                  •    Earnings Before Interest, Tax, Depreciation
           Amortization (EBITDA) dengan Beban Bunga                             and Amortization (EBITDA) to Interest
           Pinjaman tidak kurang dari 0,8 : 1 (nol koma                         Expense is not less than 0.8 : 1 (zero point
           delapan berbanding satu).                                            eight is to one).

       Obligasi ini dijamin dengan Penjaminan Pemerintah                   These bonds are guaranteed by Govermnent
       berdasarkan Peraturan Menteri Keuangan Republik                     Guarantee     based    on    Regulation    of
       Indonesia     Nomor     211/PMK.08/2020 tanggal                     The Minister of Finance of Republic Indonesia
       22 Desember 2020 dan Surat Persetujuan                              Number 211/PMK.08/202 dated December 22,
       Prinsip       Penjaminan      Pemerintah      dari                  2020     and    Letter   of   Approval    for
       Kementerian      Keuangan    Republik    Indonesia                  Government Guarantee Principles from the
       Nomor S-261/PR/2021 tanggal 21 Juni 2021.                           Ministry of Finance of Republic Indonesia
                                                                           Number S-261/PR/2021 dated June 21, 2021.

   d. Berdasarkan Akta Perubahan IV (Keempat)                          d. Based on the Deed of Amendment IV (Fourth)
      Perjanjian Perwaliamanatan Obligasi Berkelanjutan                   Trusteeship Agreement Deed Shelf Registration
      IV Waskita Karya Tahap I tahun 2020 No. 21 pada                     Bond IV Waskita Karya Phase I 2020 No. 21
      tanggal 21 Juli 2020 yang dibuat di hadapan Notaris                 dated July 21, 2020 from Notary Ashoya Ratam,
      Ashoya Ratam, S.H., M.Kn., Perusahaan telah                         S.H., M.Kn., the Company issued Shelf
      menerbitkan Obligasi Berkelanjutan IV Waskita Karya                 Registration Bond IV Waskita Karya Phase I
      Tahap I Tahun 2020 dengan jumlah pokok obligasi                     Year 2020 amounting to Rp135,500,000,000
      sebesar Rp135.500.000.000 dengan jangka waktu 3                     with fixed interest rate of 10.75% p.a.
      (tiga) tahun dan tingkat bunga tetap 10,75% per
      tahun.

       Utang obligasi ini mensyaratkan Perusahaan untuk                    Bonds payable require the Company to maintain
       mempertahankan rasio keuangan sebagai berikut:                      financial ratios as follows:

       • Current ratio tidak kurang dari 1 : 1 (satu berbanding            • Current ratio is not less than 1 : 1 (one is to
         satu);                                                              one);
       • Debt to Equity a.d interest bearing debt tidak lebih              • Debt to Equity a.d interest bearing debt is no
         dari 4 : 1 (empat berbanding satu); dan                             more than 4 : 1 (four is to one); and
       • Earning Before Interest, Tax, Depreciation and                    • Earnings Before Interest, Tax, Depreciation
         Amortization (EBITDA) dengan Beban Bunga                            and Amortization (EBITDA) to Interest
         Pinjaman tidak kurang dari 1,5 : 1 (satu koma lima                  Expense is not less than 1.5 : 1 (one point five
         berbanding satu).                                                   is to one).

   e. Berdasarkan Akta Perjanjian Perwaliamanatan                      e. Based on the Trusteeship Agreement Deed
      Obligasi Berkelanjutan III Waskita Karya Tahap IV                   Shelf Registration Bond III Waskita Karya Phase
      tahun 2019 No. 53 pada tanggal 26 April 2019 yang                   IV 2019 No. 53 dated April 26, 2019 from Notary
      dibuat di hadapan Notaris Fathiah Helmi, S.H.,                      Fathiah Helmi, S.H., the Company issued Shelf
      Perusahaan       telah     menerbitkan    Obligasi                  Registration Bond III Waskita Karya Phase IV
      Berkelanjutan III Waskita Karya Tahap IV Tahun                      Year 2019 amounting to Rp1,845,750,000,000
      2019 dengan jumlah pokok obligasi sebesar                           which consists of two tranches:
      Rp1.845.750.000.000 yang dibagi dalam dua seri:

       • Seri A dengan dengan tingkat bunga tetap 9,00%                    • Tranche A with fixed interest rate of 9.00% p.a.
         per tahun dengan nilai Rp484.000.000.000 dan                        with face value of Rp484,000,000,000 and
         sudah dibayar lunas pada 16 Mei 2022.                               have been paid in full on May 16, 2022.



                                                           139
Page 143
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

       • Seri B dengan dengan tingkat bunga tetap 9,75%                   • Tranche B with fixed interest rate of 9.75% p.a.
         per tahun dengan nilai Rp1.361.750.000.000.                        with face value of Rp1,361,750,000,000.

   f. Berdasarkan Akta Perubahan I            Perjanjian             f.   Based on Deed of Amendment I of Trustee
      Perwaliamanatan      No.    82     pada   tanggal                   Agreement No. 82 on September 26, 2018 from
      26 September 2018 yang dibuat di hadapan Notaris                    Notary Fathiah Helmi, SH, the Company issued
      Fathiah Helmi, S.H., Perusahaan telah menerbitkan                   Shelf Registration Bond III Waskita Karya Phase
      Obligasi Berkelanjutan III Waskita Karya Tahap III                  III Year 2018 with a principal amount of
      Tahun 2018 dengan jumlah pokok obligasi sebesar                     Rp1,702,750,000,000 divided into two tranches:
      Rp1.702.750.000.000 yang dibagi dalam dua seri:

       • Seri A dengan tingkat bunga tetap 9,00% per tahun                • Tranche A with a fixed interest rate of 9.00%
         dengan nilai Rp761.000.000.000 dan telah dibayar                   per annum with a face value of
         lunas pada tanggal 27 September 2021.                              Rp761,000,000,000 and has been paid in full
                                                                            on September 27, 2021.
       • Seri B dengan tingkat bunga tetap 9,75% per tahun                • Tranche B with a fixed interest rate of 9.75%
         dengan nilai Rp941.750.000.000.                                    per   year   with    a     face    value    of
                                                                            Rp941,750,000,000.

   g. Berdasarkan Akta Perjanjian Perwaliamanatan                    g. Based on the Trusteeship Agreement Deed No.
      No. 12 tanggal 6 Februari 2018 yang dibuat                        12 dated February 6, 2018 from Fathiah Helmi,
      dihadapan Fathiah Helmi, S.H., Notaris di Jakarta.                S.H., Notary in Jakarta. The Company issued
      Perusahaan menerbitkan Obligasi Berkelanjutan III                 Shelf Registration Bond III Waskita Karya Phase
      Waskita Karya Tahap II Tahun 2018 sebesar                         II     Year        2018       amounting      to
      Rp3.451.500.000.000 yang dibagi dalam dua seri:                   Rp3,451,500,000,000 which consists of two
                                                                        tranches:

       • Seri A dengan tingkat bunga tetap 7,75% per tahun                • Tranche A with fixed interest rate of 7.75% per
         dengan nilai Rp1.175.000.000.000. Obligasi ini                     annum        with      face       value      of
         sudah      dibayar     lunas     pada      tanggal                 Rp1,175,000,000,000. These bonds have
         22 Februari 2021.                                                  been paid in full on February 22, 2021.
       • Seri B dengan tingkat bunga tetap 8,25% per tahun                • Tranche B with fixed interest rate of 8.25% per
         dengan nilai Rp2.276.500.000.000. Bedasarkan                       annum        with      face       value      of
         hasil Keputusan Rapat Umum Pemegang Obligasi                       Rp2,276,500,000,000. Based on the results of
         Berkelanjutan III Waskita Karya Tahap II Tahun                     the Resolution of the General Meeting of
         2018 tanggal 16 Februari 2023, para pemegang                       Shareholders of Shelf-Registration Bonds III
         obligasi telah menyetujui     perubahan tanggal                    Waskita Karya Phase II Year 2018 dated
         pelunasan pokok Obligasi Berkelanjutan III Waskita                 February 16, 2023, the bondholders have
         Karya Tahap II Tahun 2018 Seri B dari semula                       agreed change in the principal repayment date
         tanggal 23 Februari 2023 menjadi tanggal 16 Juni                   of Waskita Karya Shelf-Registration Bond III
         2023.                                                              Year 2018 Series B from February 23, 2023 to
                                                                            June 16, 2023.

         Sesuai Surat Keterangan Notaris Dewantari                          According to the Notary Statement Letter of
         Handayani, S.H., M.PA., No. 113/NOT/SK/WK-                         Dewantari     Handayani,     S.H.,   M.PA.,
         RUPO 2/VI/2023 tanggal 14 Juni 2023,                               No. 113/NOT/SK/WK-RUPO 2/VI/2023 dated
         berdasarkan kuorum pengambilan keputusan                           June 14, 2023, based on the quorum for
         RUPO Pemegang Obligasi Berkelanjutan III                           decision-making RUPO of Shelf-Registration
         Waskita Karya Tahap II Tahun 2018, Pemegang                        Bonds III Waskita Karya Phase II Year 2018,
         Obligasi tidak menyetujui usulan Perseroan dalam                   the    Bondholders    did    not   approve
         RUPO tersebut.                                                     the Company's proposal in the RUPO.

       Berdasarkan Surat dari Otoritas Jasa Keuangan                      Based on Letter from Otoritas Jasa Keuangan
       (OJK) ke Direksi Perusahaan No. S-420/D.04/2017                    (OJK) to Company's Board of Directors
       tanggal 28 September 2017 Perusahan efektif                        No. S-420/D.04/2017 dated September 28,
       mendaftarkan Obligasi Berkelanjutan III Waskita                    2017. The Company has effectively registered
       Karya Tahap II 2018 (Obligasi).                                    the Waskita Karya Shelf III Phase II 2018
                                                                          (Bonds).




                                                          140
Page 144
                                                                    The original consolidated financial statements included herein are in
                                                                                                               the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                               PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                         AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                           NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                     FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                            AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                   MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                       (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)           (Expressed in full Rupiah amount, unless otherwise stated)

   Berdasarkan pemeringkatan yang diterbitkan oleh                   Based        on     the    ratings    issued       by
   PT Pemeringkat Efek Indonesia (Pefindo) tanggal 20 Juni           PT Pemeringkat Efek Indonesia (Pefindo) dated
   2023, peringkat Obligasi Berkelanjutan III Tahap III Seri B       June 20, 2023, the rating of Shelf Registration Bond
   Tahun 2018, Obligasi Berkelanjutan III Tahap IV Seri A            III Phase III B Series Years 2018, Shelf Registration
   dan B Tahun 2019 adalah idCCC. Peringkat obligasi III             Bond III Phase IV A and B Series Year 2019 are
   Seri A dan B Tahun 2021, Obligasi IV seri A dan B adalah          idCCC. The Rating of Bond III Tranche A and B and
   idAAA. Peringkat Obligasi Berkelanjutan III Tahap II Seri         Bond IV Tranche A and B Year 2021 is idAAA.
   B Tahun 2018 dan Obligasi Berkelanjutan IV Tahap I                The Rating of Company's Shelf Registration Bond III
   Tahun 2020 Perusahaan adalah idD.                                 Phase II B Series Year 2018 and Shelf Registration
                                                                     Bond IV Phase I Year 2020 is idD.

   Utang obligasi ini mensyaratkan Perusahaan untuk                  Bonds payable require the Company to mantain
   mempertahankan rasio keuangan sebagai berikut:                    financial ratios as follows:
   • Current ratio tidak kurang dari 1 : 1 (satu berbanding           • Current ratio is not less than 1 : 1 (one is to one);
      satu);
   • Debt to Equity a.d interest bearing debt tidak lebih dari        •   Debt to Equity a.d interest bearing debt is no
      3 : 1 (tiga berbanding satu); dan                                   more than 3 : 1 (three is to one); and
   • Earning Before Interest, Tax, Depreciation and                   •   Earnings Before Interest, Tax, Depreciation and
      Amortization (EBITDA) dengan Beban Bunga                            Amortization (EBITDA) to Interest Expense is
      Pinjaman tidak kurang dari 1,5 : 1 (satu koma lima                  not less than 1.5 : 1 (one point five is to one).
      berbanding satu).

   Evaluasi pemenuhan atas persyaratan rasio dari                    The evaluation of the fulfillment of these
   penerbitan obligasi dilakukan pada setiap akhir tahun.            requirements is held on each year end. For Bonds
   Untuk utang Obligasi III Tahun 2021, Obligasi IV Tahun            Payable III in 2021, Bonds Payable IV in 2022 and
   2022 dan Sukuk Mudharabah I Tahun 2022 dijamin oleh               Sukuk Mudharabah I Tahun 2022, these are
   Pemerintah.                                                       guaranteed by government.

   Obligasi yang diterbitkan entitas anak – WBP:                     Bonds issued by subsidiary - WBP:

   Berdasarkan Akta Perjanjian Perwaliamanatan No. 37                Based on the Trustee Agreement Deed No. 37 dated
   tanggal 15 April 2019 yang dibuat dihadapan Fathiah               April 15, 2019 by notary Fathiah Helmi, S.H., Notary
   Helmi, S.H., Notaris di Jakarta, WBP menerbitkan                  in Jakarta, WBP issued Shelf Registration Bond I
   Obligasi Berkelanjutan I Waskita Beton Precast Tahap I            Waskita Beton Precast Phase I Year 2019, with a
   Tahun 2019, dengan tingkat bunga tetap 9,95% per tahun            fixed interest rate at 9.95% per annum with face
   dengan nilai Rp500.000.000.000.                                   value of Rp500,000,000,000.

   Berdasarkan Akta Perjanjian Perwaliamanatan No. 47                Based on the Trustee Agreement Deed No. 47 dated
   tanggal 8 Oktober 2019 yang dibuat dihadapan Jose                 October 8, 2019 by notary Jose Dima Satria, S.H.,
   Dima Satria, S.H., Notaris di Jakarta, WBP menerbitkan            Notary in Jakarta, WBP issued Shelf Registration
   Obligasi Berkelanjutan I Waskita Beton Precast Tahap II           Bond I Waskita Beton Precast Phase II Year 2019,
   Tahun 2019, dengan tingkat bunga tetap 9,75% per tahun            with a fixed interest rate at 9.75% per annum with
   dengan nilai Rp1.500.000.000.000.                                 value of Rp1,500,000,000,000.

   Berdasarkan pemeringkatan yang diterbitkan oleh                   Based on the rating issued by PT Pemeringkat
   PT Pemeringkat Efek Indonesia tanggal 14 September                Efek Indonesia dated September 14, 2022,
   2022, peringkat obligasi adalah D(idn).                           the bonds rating is D(idn).

   Utang obligasi ini mensyaratkan WBP untuk                         These bonds require WBP                           to    maintain
   mempertahankan rasio keuangan sebagai berikut:                    the following financial ratios:

   •   Current ratio minimal 1.0 x (satu kali)                        •   Current ratio of at least 1.0 x (one time)
   •   Debt to equity ratio (DER) maksimal 2,5 (dua koma              •   Maximum Debt to equity ratio (DER) is 2.5 (two
       lima)                                                              point five)
   •   Debt Service Coverage (DSC) minimal 100%                       •   Debt Service Coverage (DSC) of at least 100%
       (seratus persen)                                                   (one hundred percent)

   Utang obligasi akan jatuh tempo pada tahun ke 6 sejak               Bonds payable will be due on the 6th year from
   Tangga Efektif dengan tingkat bunga 2% per tahun                    Effective Date with interest rate of 2% per annum.



                                                          141
Page 145
                                                                                   The original consolidated financial statements included herein are in
                                                                                                                              the Indonesian language.


 PT WASKITA KARYA (PERSERO) TBK                                                            PT WASKITA KARYA (PERSERO) TBK
 DAN ENTITAS ANAK                                                                                      AND ITS SUBSIDIARIES
 CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO THE INTERIM CONSOLIDATED
 KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                                  FINANCIAL STATEMENTS AS OF JUNE 30, 2023
 31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                         AND DECEMBER 31, 2022 AND FOR THE SIX
 ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                                MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
 (2022 – DIAUDIT) – Lanjutan                                                                    (2022 – AUDITED) – Continued
 (Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                        (Expressed in full Rupiah amount, unless otherwise stated)

30. LIABILITAS JANGKA PENDEK LAINNYA                                           30. OTHER SHORT-TERM LIABILITIES

                                                           30 Juni/                31 Desember/
                                                        June 30, 2023            December 31, 2022
                                                             Rp                         Rp

      Insentif Kerja                                         27.839.093.369             36.209.941.333                                       Incentives
      Iuran Dana Pensiun                                    117.977.657.319             81.313.906.828                        Pension Fund Contribution
      Jamsostek                                              11.426.364.087              9.991.458.237                                      Jamsostek
      Lain-lain                                           1.638.558.888.544          1.721.365.122.077                                           Others
      Dikurangi: Liabilitas Keuangan                                                                                            Less: Financial Liability
       Saling Hapus                                      (1.038.425.342.252)        (1.038.425.342.252)                                          Offset
      Jumlah                                                757.376.661.067            810.455.086.223                                             Total


    Liabilitas jangka pendek lainnya – lain-lain merupakan                          Other short-term liabilities – others represent
    beban akrual denda pajak dan beban pemeliharan                                  accruals for tax penalties and project maintenance
    proyek.                                                                         expenses.

31. UTANG BANK JANGKA PANJANG                                                  31. LONG-TERM BANK LOANS

                                                                                                         30 Juni/                  31 Desember/
                                                                                                      June 30, 2023              December 31, 2022
                                                                                                           Rp                           Rp
      Pihak Berelasi/ Related Parties
        Perusahaan/ The Company
          Perjanjian Restrukturisasi Induk/ Master Restructuring Agreement
            PT Bank Negara Indonesia (Persero) Tbk                                                        7.526.905.037.356          7.496.588.650.843
            PT Bank Mandiri (Persero) Tbk                                                                 4.555.366.264.204          4.554.941.232.258
            PT Bank Rakyat Indonesia (Persero) Tbk                                                        2.695.686.687.518          2.663.789.519.937
            PT Bank Syariah Indonesia                                                                     2.035.361.522.506          2.036.409.513.872
          Sindikasi Modal Kerja/ Working Capital Syndication
             PT Bank Mandiri (Persero) Tbk                                                                3.394.448.115.562          2.457.367.990.065
             PT Bank Rakyat Indonesia (Persero) Tbk                                                       1.191.071.578.925          1.830.326.590.007
             PT Bank Negara Indonesia (Persero) Tbk                                                         312.864.920.200            422.238.336.697
        Entitas anak/ Subsidiaries
          WTR Grup/Group
          Non Sindikasi Modal Kerja/ Working Capital Non Syndication
             TJT, CTP, WST dan/and WBW
             PT Bank Rakyat Indonesia (Persero) Tbk
               Kredit Investasi/Investment Credit                                                         1.763.352.111.497          1.783.008.602.759
               Kredit IDC/IDC Credit                                                                        113.513.922.643            113.703.922.643
          Sindikasi Modal Kerja/ Working Capital Syndication
             WTTR, PBTR, CCT, WBW, dan/and CTP
             PT Bank Negara Indonesia (Persero) Tbk
               Kredit Investasi/Investment Credit                                                         1.574.863.282.314          1.576.472.703.038
               Kredit IDC/IDC Credit                                                                        137.067.122.693            135.998.058.605
             PT Bank Rakyat Indonesia (Persero) Tbk
               Kredit Investasi/Investment Credit                                                          159.131.671.543             159.308.671.543
               Kredit IDC/IDC Credit                                                                        34.168.989.302              33.300.008.543
             PT Bank Syariah Indonesia (d/h PT Bank BNI Syariah)
               Kredit Investasi/Investment Credit                                                          192.935.570.091             192.979.274.197
             PT Bank Syariah Indonesia Tbk (d/h PT Bank Mandiri Syariah)
               Kredit Investasi/Investment Credit                                                          749.123.100.050             750.746.200.100
          WKR
          Modal Kerja/ Working Capital
             PT Bank Tabungan Negara (Persero) Tbk                                                        1.096.714.067.782          1.114.270.315.745
          WBP
             PT Bank Rakyat Indonesia (Persero) Tbk                                                         315.243.369.529            307.953.591.213
             PT Bank Syariah Indonesia (d/h PT Bank BRI Syariah)                                            255.064.672.653            178.930.675.660
             PT Bank Negara Indonesia (Persero) Tbk                                                         195.840.528.061            190.788.082.901
             PT Bank Mandiri (Persero) Tbk                                                                  111.492.438.573                          --
          Dikurangi: Bagian yang Jatuh Tempo dalam Satu Tahun/ Less: Current Maturities                   (836.802.360.609)          (250.390.934.144)
        Sub Jumlah/ Sub-Total                                                                         27.573.412.612.393           27.748.731.006.482




                                                                        142
Page 146
                                                                                The original consolidated financial statements included herein are in
                                                                                                                           the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                           PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                                     AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                       NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                                 FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                        AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                               MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                                   (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                       (Expressed in full Rupiah amount, unless otherwise stated)

                                                                                                     30 Juni/                   31 Desember/
                                                                                                  June 30, 2023               December 31, 2022
                                                                                                       Rp                            Rp
     Pihak Ketiga/ Third Parties
       Perusahaan/ The Company
         Perjanjian Restrukturisasi Induk/ Master Restructuring Agreement
            PT Bank BTPN Tbk                                                                        2.276.032.811.377            2.276.032.811.377
            PT Bank Pan Indonesia Tbk                                                               1.937.854.730.295            1.941.293.233.348
            Bank of China Ltd                                                                       1.140.424.112.008            1.140.424.112.008
            PT Bank Pembangunan Daerah
             Jawa Barat dan Banten Tbk                                                                998.222.785.772            1.001.276.551.888
            PT Bank UOB Indonesia                                                                     251.102.529.990              264.290.837.080
            PT Shinhan Bank Indonesia                                                                 238.064.217.020              238.064.217.020
            PT Bank Maybank Indonesia Tbk                                                             500.000.000.000              500.000.000.000
            PT Bank Permata Tbk                                                                       699.599.183.062              699.599.183.062
            Bank QNB Indonesia                                                                        417.796.279.058              417.796.279.058
            PT Bank KEB Hana Indonesia                                                                281.805.760.004              281.805.760.004
            PT Bank OCBC NISP Tbk                                                                     281.805.760.004              279.549.549.429
            PT Bank DKI                                                                               235.000.000.000              235.000.000.000
            PT Bank China Construction Bank Indonesia Tbk                                             225.444.608.003              225.444.608.003
            PT Bank CTBC Indonesia                                                                    169.083.456.002              169.083.456.002
            PT Bank BNP Paribas Indonesia                                                             154.781.999.763              154.781.999.763
            PT Bank Resona Perdania Indonesia                                                         167.137.162.274              167.137.162.274
            PT Bank SBI Indonesia                                                                      84.541.728.001               84.541.728.001
         Sindikasi Modal Kerja/ Working Capital Syndication
            PT Bank Pembangunan Daerah
             Jawa Barat dan Banten Tbk                                                                190.116.968.257              332.737.785.378
            PT Bank Pembangunan Daerah Sumatera Utara                                                 189.632.090.304              332.737.785.390
       Entitas anak/ Subsidiaries
         WTR
         Sindikasi Modal Kerja/ Working Capital Syndication
            WTTR, PBTR, CCT, WBW, dan/and CTP
            PT CIMB Niaga Tbk - Unit Usaha/ Business Unit Syariah
              Kredit Investasi/Investment Credit                                                      504.907.385.495              505.507.385.495
              Kredit IDC/IDC Credit                                                                    21.589.902.007               32.161.075.297
            PT Bank Aceh Syariah
              Kredit Investasi/Investment Credit                                                      385.871.229.326              385.958.620.142
            PT Bank Pembangunan Daerah Riau Kepri - Unit Usaha/
              Business Unit Syariah
              Kredit Investasi/Investment Credit                                                       72.350.872.217               72.367.254.734
            PT Bank Bank Pembangunan Daerah DIY - Unit Usaha/
              Business Unit Syariah
              Kredit Investasi/Investment Credit                                                       48.233.887.733               48.244.813.505
            PT Bank Pembangunan Daerah Jawa Barat dan Banten Tbk
              - Unit Usaha/ Business Unit Syariah
              Kredit Investasi/Investment Credit                                                       98.175.438.344               98.294.571.048
            PT Bank Pembangunan Daerah Jawa Timur Tbk - Unit Usaha/
              Business Unit Syariah
              Kredit Investasi/Investment Credit                                                       84.151.230.915               84.251.230.915
              Kredit IDC/IDC Credit                                                                   121.885.062.680                5.360.179.216
            PT Bank Pembangunan Daerah Kalimantan Barat
              Kredit Investasi/Investment Credit                                                      170.325.365.599              170.497.064.599
              Kredit IDC/IDC Credit                                                                    39.315.983.695               38.372.270.809
            PT Bank Kalimantan Selatan - Unit Usaha/ Business Unit Syariah
              Kredit Investasi/Investment Credit                                                       48.233.913.826               48.244.836.488
            PT Bank Pembangunan Daerah Sumatera Utara
              Kredit Investasi/Investment Credit                                                      135.788.244.525              135.927.724.289
              Kredit IDC/IDC Credit                                                                    11.601.224.475               11.601.224.475
            PT Bank Pembangunan Daerah Jambi
              Kredit Investasi/Investment Credit                                                      135.788.244.525              135.927.724.289
              Kredit IDC/IDC Credit                                                                    18.279.256.699               15.824.288.164
            PT Bank Pembangunan Daerah Bengkulu
              Kredit Investasi/Investment Credit                                                       80.909.003.845               80.994.852.845
              Kredit IDC/IDC Credit                                                                    17.214.749.112               16.773.593.717




                                                                     143
Page 147
                                                                            The original consolidated financial statements included herein are in
                                                                                                                       the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                   PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                             AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                         FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                       MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                           (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                 (Expressed in full Rupiah amount, unless otherwise stated)

                                                                                                 30 Juni/                  31 Desember/
                                                                                              June 30, 2023              December 31, 2022
                                                                                                   Rp                           Rp
          PT Bank Pembangunan Daerah Lampung
            Kredit Investasi/Investment Credit                                                     81.950.321.874               82.036.170.874
            Kredit IDC/IDC Credit                                                                  10.696.567.103               10.282.167.199
          PT Bank Pembangunan Daerah DIY
            Kredit Investasi/Investment Credit                                                     45.262.748.175               45.309.241.429
             Kredit IDC                                                                             6.093.085.569                5.274.762.723
          PT Bank Pembangunan Daerah Bali
            Kredit Investasi/Investment Credit                                                    148.802.634.239              148.958.223.128
             Kredit IDC                                                                            26.354.869.327               24.686.229.666
          PT Bank Pembangunan Daerah Kalimantan Tengah
            Kredit Investasi/Investment Credit                                                    135.788.244.525              135.927.724.289
            Kredit IDC/IDC Credit                                                                  18.279.256.699               15.824.288.164
          PT Bank Pembangunan Daerah Kalimantan Selatan
            Kredit Investasi/Investment Credit                                                    216.697.248.370              216.922.577.134
            Kredit IDC/IDC Credit                                                                  35.494.005.811               32.597.881.880
          PT Bank Pembangunan Daerah Sulawesi Tengah
            Kredit Investasi/Investment Credit                                                     45.262.748.175               45.309.241.429
            Kredit IDC/IDC Credit                                                                   6.093.085.569                5.274.762.723
          PT Bank Pembangunan Daerah Sulawesi Selatan dan Sulawesi Barat
            Kredit Investasi/Investment Credit                                                     67.893.630.394               67.963.370.283
            Kredit IDC/IDC Credit                                                                   9.140.120.215                7.912.635.949
          PT Bank Pembangunan Daerah Sumatera Selatan dan Bangka Belitung
            Kredit Investasi/Investment Credit                                                    341.003.133.574              341.350.150.294
            Kredit IDC/IDC Credit                                                                  53.897.934.885               52.954.221.999
          PT Bank Pembangunan Daerah Riau dan Kepulauan Riau
            Kredit Investasi/Investment Credit                                                    331.425.651.118              331.763.644.781
            Kredit IDC/IDC Credit                                                                  46.889.259.213               46.181.475.897
          PT Bank Pembangunan Daerah Papua
            Kredit Investasi/Investment Credit                                                    492.525.936.638              493.030.224.944
            Kredit IDC/IDC Credit                                                                  74.496.631.054               66.659.871.791
          PT Bank Pembangunan Daerah Maluku dan Maluku Utara
            Kredit Investasi/Investment Credit                                                    100.618.318.395              100.720.613.649
            Kredit IDC/IDC Credit                                                                  18.907.203.432               17.781.999.256
          PT Bank Pembangunan Daerah Nusa Tenggara Timur
            Kredit Investasi/Investment Credit                                                    167.550.315.347              167.722.014.347
            Kredit IDC/IDC Credit                                                                  33.322.225.331               32.419.730.407
          PT Bank Pembangunan Daerah Jawa Timur Tbk
            Kredit Investasi/Investment Credit                                                    721.476.645.616              722.336.928.956
            Kredit IDC/IDC Credit                                                                 136.264.726.424              132.855.833.976
          PT Bank Nagari
            Kredit Investasi/Investment Credit                                                    181.050.008.962              181.235.982.001
            Kredit IDC/IDC Credit                                                                  15.469.283.038               15.469.283.038
          PT Bank Pan Indonesia Tbk
            Kredit Investasi/Investment Credit                                                    955.779.585.129              953.386.305.539
            Kredit IDC/IDC Credit                                                                 117.582.796.369              114.362.518.914
          PT Bank ICBC Indonesia
            Kredit Investasi/Investment Credit                                                    181.486.954.332              181.744.502.332
            Kredit IDC/IDC Credit                                                                  19.029.583.474               18.135.787.595
          PT Bank Artha Graha International Tbk
            Kredit Investasi/Investment Credit                                                    135.788.244.525              135.927.724.289
            Kredit IDC/IDC Credit                                                                  18.279.256.700               15.824.288.162
          PT Bank Pembangunan Daerah Jawa Tengah
            Kredit Investasi/Investment Credit                                                    226.313.740.876              226.546.207.167
            Kredit IDC/IDC Credit                                                                  19.335.374.124               19.335.374.124




                                                              144
Page 148
                                                                                 The original consolidated financial statements included herein are in
                                                                                                                            the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                          PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                                    AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                                FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                       AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                              MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                                  (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                        (Expressed in full Rupiah amount, unless otherwise stated)

                                                                                                     30 Juni/                  31 Desember/
                                                                                                  June 30, 2023              December 31, 2022
                                                                                                       Rp                           Rp
           PT Bank Mega Syariah
              Kredit investasi                                                                         99.883.080.008              100.099.493.347
         WKR
           PT J Trust Bank                                                                             60.937.500.000               65.000.000.000
         WKI
           Kredit Investasi/Investment Credit
           PT Bank Pembangunan Daerah Jawa Barat dan Banten Tbk                                       112.627.609.265              114.627.609.265
         WBP
           PT Bank DKI                                                                                  71.241.706.282               67.527.683.680
           PT Bank Tabungan Pensiunan Nasional Tbk                                                    224.282.219.784              218.460.388.244
           PT Bank Permata Tbk                                                                        167.987.139.724              160.941.525.993
           PT Bank CTBC Indonesia                                                                     118.926.914.746              115.644.797.398
           PT BCA Syariah                                                                               40.543.363.898               39.073.560.073
           PT Bank ICBC Indonesia                                                                       29.680.556.326               28.955.346.560
         Dikurangi: Bagian yang Jatuh Tempo dalam Satu Tahun/ Less: Current Maturities                (31.571.930.031)             (28.108.026.125)
       Sub Jumlah/ Sub Total                                                                       18.569.906.710.815           18.722.152.107.875
     Jumlah                                                                                        46.143.319.323.208           46.470.883.114.357


   Suku bunga kontraktual per tahun sebagai berikut:                                Contractual interest rate per annum are as follow:

                                                                                                   30 Juni/                    31 Desember/
                                                                                                 June 30, 2023               December 31, 2022

   Perusahaan/ The Company
     PT Bank Negara Indonesia (Persero) Tbk                                                          5,50%                           5,50%
     PT Bank Rakyat Indonesia (Persero) Tbk                                                          5,50%                           5,50%
     PT Bank Mandiri (Persero) Tbk                                                                   5,50%                           5,50%
     PT Bank Pan Indonesia Tbk                                                                       5,50%                           5,50%
     PT Bank BTPN Tbk                                                                                5,50%                           5,50%
     PT Bank UOB Indonesia                                                                           5,50%                           5,50%
     PT Bank DKI                                                                                     5,50%                           5,50%
     PT Bank Syariah Indonesia Tbk (d/h/ formerly PT Bank Syariah Mandiri,
     PT Bank BNI Syariah, dan PT Bank BRIsyariah Tbk)                                                5,50%                           5,50%
     PT Bank BNP Paribas Indonesia                                                                   5,50%                           5,50%
     PT Bank Pembangunan Daerah
       Jawa Barat dan Banten Tbk                                                                     5,50%                           5,50%
     PT Bank Maybank Indonesia Tbk                                                                   5,50%                           5,50%
     PT Bank BTPN Tbk,
       Bank of China (Hong Kong) Limited Jakarta Branch, PT Bank KEB Hana
       Indonesia, PT Bank Permata Tbk., PT Bank OCBC NISP Tbk., PT Bank China
       Construction Bank Indonesia Tbk., PT Bank CTBC Indonesia,
       PT Bank Shinhan Indonesia, dan PT Bank SBI Indonesia                                          5,50%                           5,50%
     Bank of China Ltd                                                                               5,50%                           5,50%
     PT Bank BTPN Tbk,
       PT Bank Permata Tbk., PT Bank Shinhan Indonesia, dan PT Bank Resona Perdania                  5,50%                           5,50%
     PT Bank Mandiri (Persero) Tbk,
       PT Bank Negara Indonesia (Persero) Tbk, PT Bank Rakyat Indonesia (Persero) Tbk                5,40%                           5,40%
   Entitas anak/ Subsidiary Entity - WBP
     PT Bank Permata Tbk                                                                             2,00%                           2,00%
     PT Bank Mandiri (Persero) Tbk                                                                   2,00%                           2,00%
     PT Bank ICBC Indonesia                                                                          2,00%                           2,00%
     PT Bank CTBC Indonesia                                                                          2,00%                           2,00%
     PT Bank Negara Indonesia (Persero) Tbk                                                          2,00%                           2,00%
     PT Bank BCA Syariah                                                                             2,00%                           2,00%
     PT Bank Rakyat Indonesia (Persero) Tbk                                                          2,00%                           2,00%
     PT Bank Syariah Indonesia
         (d/h/ formerly PT Bank BRI Syariah dan PT Bank BNI Syariah)                                 2,00%                           2,00%
     PT Bank BTPN Tbk                                                                                2,00%                           2,00%




                                                                    145
Page 149
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

   Pihak Berelasi                                                    Related Parties

   Perusahaan                                                        The Company

   1. Perjanjian Restrukturisasi Induk                           2. 1.    Master Restructuring Agreement

       Berdasarkan Akta Notaris Ashoya Ratam S.H., M.Kn,                 Based on the Notary Deed of Ashoya Ratam
       No. 40 tanggal 25 Agustus 2021, Perusahaan                        S.H., M.Kn, No. 40 dated August 25, 2021,
       menandatangani perjanjian dengan PT Bank Mandiri                  the Company signed agreements with PT Bank
       (Persero) Tbk, PT Bank Rakyat Indonesia (Persero)                 Mandiri (Persero) Tbk, PT Bank Rakyat
       Tbk, PT Bank Negara Indonesia (Persero) Tbk,                      Indonesia (Persero) Tbk, PT Bank Negara
       PT Bank DKI, PT Bank Pembangunan Daerah Jawa                      Indonesia (Persero) Tbk, PT Bank DKI,
       Barat dan Banten Tbk, PT Bank Syariah Indonesia                   PT Bank Pembangunan Daerah Jawa Barat and
       Tbk dan PT Bank BTPN Tbk untuk merestrukturisasi                  Banten Tbk, PT Bank Syariah Indonesia Tbk
       kewajiban Perusahaan. Pihak-pihak Bank setuju                     and PT Bank BTPN Tbk to restructure
       melakukan resrukturisasi atas kewajiban-kewajiban                 the Company's obligations. The Bank's parties
       pembayaran Perusahaan sehubungan dengan                           agreed to restructure the Company's payment
       fasilitas-fasilitas pembiayaan yang diberikan oleh                liabilities in relation to the financing facilities
       pihak-pihak bank dengan jumlah keseluruhan                        provided by the banks with total amount of
       sebesar Rp29.252.309.664.899. Restrukturisasi                     Rp29,252,309,664,899. The restructuring of
       kewajiban Perusahaan tersebut dibagi menjadi                      the Company's liabilities was divided into
       2 (dua) Tranches, yaitu:                                          2 (two) tranches, namely:

       a. Fasilitas Kredit                                                a.    Credit Facility
          - Fasilitas    Kredit  Tranche   A    sebesar                         - Tranche A credit facility amounting to
            Rp13.422.237.848.046, dengan fixed rate                               Rp13,422,237,848,046, with a fixed rate
            sebesar 5,5% dan fixed rate 8% untuk fasilitas                        of 5.5% and a fixed rate of 8% for
            Tranche Revolving A;                                                  the Tranche Revolving A facility;
          - Fasilitas    Kredit  Tranche   B    sebesar                         - Tranche B credit facility amounting to
            Rp13.616.139.687.859, dengan fixed rate                               Rp13,616,139,687,859, with a fixed rate
            sebesar 5,5%.                                                         of 5.5%.
       b. Fasilitas Pembiayaan Syariah                                    b.    Sharia Financing Facilities
          - Fasilitas Pembiayaan Syariah Tranche A                              - Tranche A Sharia Financing Facility
            sebesar Rp307.100.787.816;                                            amounting to Rp307,100,787,816;
          - Fasilitas Pembiayaan Syariah Tranche B                              - Tranche B Sharia Financing Facility
            sebesar Rp1.906.831.341.177.                                          amounting to Rp1,906,831,341,177.

       Jatuh tempo pembayaran pinjaman pada tanggal                       The maturity date of the loan payment is on
       31 Desember 2026. Terdapat opsi perpanjangan                       December 31, 2026. There is an option to
       waktu pada fasilitas kredit tranche B2 paling lama                 extend the term of the tranche B2 credit facility
       sampai tanggal 31 Desember 2031. Jaminan atas                      up to December 31, 2031. The collateral for
       masing-masing fasilitas kredit ini tetap tunduk pada               each of these credit facilities is still subject to
       dokumen-dokumen jaminan yang telah dibuat dan                      the collateral documents that have been made
       ditandatangani atau yang akan dibuat dan                           and signed or to be made and signed by
       ditandatangi para Pihak (Catatan 5 dan 16).                        the Parties (Notes 5 and 16).

       Perusahaan diwajibkan mempertahankan rasio                         Companies are required to maintain financial
       keuangan sebagai berikut: Current ratio minimal                    ratios as follows: Current ratio of at least
       1 (satu) kali, interest service coverage rasio (ISCR)              1 (one) time, interest service coverage ratio of
       minimal 1,0 kali yang berlaku per laporan keungan 31               at least 1.0 time applicable per financial report
       Desember 2022, Interest Service Coverage Ratio                     December 31, 2022, Interest Service Coverage
       minimal 1,1 (satu koma satu) kali yang berlaku per                 Ratio (ISCR) at least 1.1 (one point one)
       laporan keungan 31 Desember 2023, dan Ekuitas                      time applicable per financial statement
       minimal Rp3.000.000.000.000.                                       December 31, 2023, and a minimum Equity of
                                                                          Rp3,000,000,000,000.

       Berdasarkan Perjanjian Aksesi pada tanggal                         Based on the Accession Agreement as
       15 September 2021, Pihak-pihak yang melakukan                      September 15, 2021, the Parties carrying out
       Aksesi, yang terdiri dari PT Bank BNP Paribas                      the Accession, consist of PT Bank BNP Paribas
       Indonesia, PT Bank BTPN Tbk, PT Bank China                         Indonesia, PT Bank BTPN Tbk, PT Bank China
       Construction Bank Indonesia Tbk, PT Bank CTBC                      Construction Bank Indonesia Tbk, PT Bank

                                                          146
Page 150
                                                                    The original consolidated financial statements included herein are in
                                                                                                               the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                               PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                         AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                           NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                     FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                            AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                   MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                       (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)           (Expressed in full Rupiah amount, unless otherwise stated)

       Indonesia, PT Bank KEB Hana Indonesia,                              CTBC Indonesia, PT Bank KEB Hana
       PT Maybank Indonesia Tbk, PT Bank OCBC NISP                         Indonesia, PT Maybank Indonesia Tbk,
       Tbk, Bank of China Ltd, PT Bank Pan Indonesia Tbk,                  PT Bank OCBC NISP Tbk, Bank of China Ltd,
       PT Bank Permata Indonesia Tbk, PT Bank QNB                          PT Bank Pan Indonesia Tbk, PT Bank Permata
       Indonesia Tbk, PT Bank Resona Perdania, PT Bank                     Indonesia Tbk, PT Bank QNB Indonesia Tbk,
       SBI Indonesia, PT Bank Shinhan Indonesia dan PT                     PT Bank Resona Perdania, PT Bank SBI
       Bank UOB Indonesia, menyatakan untuk menjadi                        Indonesia, PT Bank Shinhan Indonesia and
       pihak dalam Perjanjian Restrukturisasi Induk dan                    PT Bank UOB Indonesia, declared to be parties
       berjanji untuk melaksanakan seluruh kewajiban yang                  to the Master Restructuring Agreement and
       dinyatakan dalam Perjanjian Restrukturisasi Induk.                  promised to carry out all the obligations stated
       Terkhusus Perjanjian Aksesi Bank UOB menyatakan                     in the Master Restructuring Agreement. In
       bahwa jumlah pokok fasilitas pembiayaan yang belum                  particular, the UOB Bank Accession Agreement
       terbayarkan adalah sebesar Rp859.000.000.000.                       states that the principal amount of the unpaid
                                                                           financing facility is Rp859,000,000,000.

       Perjanjian kredit ini dijamin dan diikat dengan piutang            The credit agreement is secured and bounded
       usaha Perusahaan (Catatan 5). Selain itu, perjanjian               with the Company’s account receivables
       kredit ini juga dijamin dan diikat dengan aset tetap               (Note 5). In addition, this credit agreement is
       Perusahaan, dengan rincian sebagai berikut:                        also guaranteed and bound by The Company’s
                                                                          fixed assets, with detalis as follows:

   •   PT Bank Mandiri (Persero) Tbk, jaminan berupa                  •   PT Bank Mandiri (Persero) Tbk, collateral in
       3 (tiga) bidang tanah berikut bangunan kantor cabang               the form of 3 (three) plots of land and buildings
       Pekanbaru, 1 (satu) bidang tanah yang berlokasi di                 at Pekanbaru Branch office, 1 (one) plot of land
       Karawang, 13 (tiga belas) bidang tanah yang                        at Karawang, 13 (thirteen) plots of land at
       berlokasi di Cileungsi, 2 (dua) bidang tanah yang                  Cileungsi, 2 (two) plots of land at Makasar, and
       beralokasi di Makassar, dan 2 (dua) bidang tanah                   2 (two) plots of land at Bali which have been
       yang berlokasi di Bali yang telah diserahkan dan telah             submitted and tied with guarantee rights
       diikat hak tanggungan (HT) dengan nilai                            amounting to Rp79,700,000,000 (Note 16).
       Rp79.700.000.000 (Catatan 16).

   •   PT Bank Negara Indonesia (Persero) Tbk, jaminan                •   PT Bank Negara Indonesia (Persero) Tbk,
       berupa:                                                            jaminan berupa:

       a. Persediaan yang telah diikat akta fidusia No. 5                 a. Inventory which has been tied by fiduciary
          tanggal 13 Agustus 1998 dan telah didaftarkan di                   deed No. 5 dated August 13, 1998 and was
          Kantor Pendaftaran Fidusia; Sertifikat Jaminan                     registered at the Fiduciary Registration
          Fidusia No. C2-4831 HT.04.06. TH.2001/NTSD                         Office; the Fiduciary Certificate No. C2-4831
          tanggal     26     Januari     2001       senilai                  HT.04.06.TH. 2001/NTSD dated January
          Rp8.268.049.363 (Catatan 9).                                       26, 2001 amounting to Rp8,268,049,363
                                                                             (Note 9).

       b. Satu bidang tanah SHGB No. 724 tanggal                          b. A plot of land SHGB No. 724 dated March
          29 Maret 1988 sampai dengan 1 Desember 2027                        29, 1988 until December 1, 2027, an area of
          seluas 2.098 m2 terletak di Kelurahan Cipinang                     2,098 sqm located in Kelurahan Cipinang
          Cempedak, Kecamatan Jatinegara, Jakarta                            Cempedak, Kecamatan Jatinegara, East
          Timur,   atas     nama     Perusahaan    senilai                   Jakarta on behalf of the Company
          Rp1.500.000.000      sesuai     dengan     SHT                     amounting to Rp1,500,000,000 according to
          No. 397/T/1988, senilai Rp31.000.000.000 sesuai                    SHT No. 397/T/1988, amounting to
          dengan     SHT.II    No.    408/2004,    senilai                   Rp31,000,000,000 according to SHT.II
          Rp48.320.400.000 sesuai dengan SHT III                             No.       408/2004,     amounting        to
          No. 06386/2014 dan senilai Rp11.120.940.000                        Rp48,320,400,000 according to SHT III
          sesuai dengan SHT IV N0. 01623/2015                                No.      06386/2014,     amounting       to
          dan senilai Rp250.208.660.000 sesuai dengan                        Rp11,120,940,000 according to SHT IV No.
          SHT V No. 03630/2021 (Catatan 16).                                 01623/2015       and     amounting       to
                                                                             Rp250,208,660,000 according to SHT V No.
                                                                             03630/2021 (Note 16).




                                                          147
Page 151
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

       c. Satu bidang tanah SHGB No. 38, tanggal 21 April                c. A plot of land with SHGB No. 38, April 21,
          2003 sampai dengan 20 April 2022, seluas 1.332                    2003 until April 20, 2022, an area of 1,332
          m2 dan No. 69 tanggal 20 Februari 1998 sampai                     sqm and No. 69, February 20, 1998 until
          dengan 24 September 2027 seluas 1.495 m2                          September 24, 2027, an area of 1,495 sqm,
          terletak di Jl. Langko Kelurahan Ampenan                          located at Jl. Langko Kelurahan Ampenan
          Selatan, Kecamatan Ampenan, Mataram, Nusa                         Selatan, Kecamatan Ampenan, Mataram,
          Tenggara Barat, atas nama Perusahaan Cabang                       West Nusa Tenggara, on behalf of
          NTB senilai Rp1.332.000.000 sesuai dengan                         the Company NTB Branch amounting to
          SHT.I No. 687/2007, senilai Rp1.860.010.000                       Rp1,332,000,000 according to SHT.I
          sesuai dengan SHT II No. 30/2016 dan senilai                      No. 687/2007, amounting Rp1,860,010,000
          Rp31.509.990.000 sesuai dengan SHT III                            according to SHT II No. 30/2016 and
          No. 01882/2021 (Catatan 16).                                      amounting to Rp31,509,990,000 according
                                                                            to SHT III No. 01882/2021 (Note 16).

       d. Satu bidang tanah SHGB No. 2001 tanggal                        d. A plot of land with SHGB No. 2001 dated
          1 Juni 2006 sampai dengan tanggal 1 Januari                       June 1, 2006 until on January 1, 2026, an
          2026, seluas 5.798 m2, terletak di Kelurahan Kuta                 area of 5,798 sqm, located in Kelurahan
          Alam, Banda Aceh, Aceh, atas nama Perusahaan                      Kuta Alam, Banda Aceh, Aceh, on behalf
          senilai Rp5.191.600.000 sesuai dengan SHT I                       of    the     Company      amounting    to
          No. 323, senilai Rp9.779.660.000 sesuai SHT                       Rp5,191,600,000 according to SHT I
          IINo. 1375/2015 dan senilai Rp11.398.740.000                      No. 323, amounting Rp9,779,660,000
          sesuai dengan SHT III No. 00884/2021                              according to SHT II No. 1375/2015 and
          (Catatan 16).                                                     amounting to Rp11,398,740,000 according
                                                                            to SHT III No. 00884/2021 (Note 16).

       e. Satu    bidang   tanah     SHGB     No.     4                  e. A plot of land with SHGB No. 4 dated
          tanggal 10 November 1998 sampai dengan                            November 10, 1998 until December 15,
          15 Desember 2036 seluas 2.511 m2, terletak di                     2036    an    area    of   2,511    sqm,
          Desa/Kelurahan   Betung-Tebal,    Kecamatan                       located in Desa/Kelurahan Betung-Tebal,
          Lubuk-Begalung, Padang, Sumatera Barat, atas                      Kecamatan Lubuk-Begalung, Padang, West
          nama Perusahaan senilai Rp651.430.000, senilai                    Sumatera, on behalf of the Company
          Rp6.321.020.000      sesuai      SHT        II                    amounting to Rp651,430,000, amounting
          No. 169/2016 dan senilai Rp2.012.550.000                          Rp6,321,020,000 according to SHT II
          sesuai dengan SHT III No. 01795/2021                              No.    169/2016    and    amounting   to
          (Catatan 16).                                                     Rp2,012,550,000 according to SHT III
                                                                            No. 01795/2021 (Note 16).

       f. Satu bidang tanah SHGB No. 7 tanggal                           f.   A plot of land with SHGB No. 7 dated
          10 Februari 1993 sampai dengan 7 Februari 2013                      February 10, 1993 until February 7, 2013, an
          seluas 806 m2, terletak di Kelurahan Belakanolo,                    area of 806 sqm, located in Kelurahan
          Kecamatan Padang Barat, Padang, Sumatera                            Belakanolo, Kecamatan Padang Barat,
          Barat,   atas     nama     Perusahaan     senilai                   Padang, West Sumatera, on behalf of
          Rp1.270.880.000 sesuai dengan SHT I                                 the      Company         amounting        to
          No. 3129/2001, senilai Rp460.020.000 sesuai                         Rp1,270,880,000 according to SHT I
          dengan SHT II No. 1151/2007. SHGB tersebut                          No.129/2001, amounting to Rp460,020,000
          telah diperpanjang sampai dengan 7 Februari                         according to SHT II No. 1151/2007. The land
          2033, senilai Rp3.474.910.000 sesuai SHT III No.                    right (SHGB) has been extended until
          1846/2016 dan senilai Rp2.489.190.000 sesuai                        February     7,   2033,     amounting     to
          dengan SHT IV No. 01734/2021 (Catatan 16).                          Rp3,474,910,000 according to SHT III No
                                                                              1846/2016       and       amounting       to
                                                                              Rp2,489,190,000 according to SHT IV No.
                                                                              01734/2021 (Note 16).

       g. Satu bidang tanah SHGB No. 436 tanggal                         g. A plot of land with SHGB No. 436 dated
          10 Maret 1998 sampai dengan 19 Juni 2032,                         March 10, 1998 until June 19, 2032, an area
          seluas 1.004 m2, terletak di Desa Sungai Raya,                    of 1,004 sqm, located in Desa Sungai Raya,
          Pontianak, Kalimantan Barat, atas nama                            Pontianak, West Kalimantan, on behalf of
          Perusahaan senilai Rp464.850.000 sesuai                           the Company amounting to Rp464,850,000
          dengan     SHT     I    No. 356/2001,   senilai                   according to SHT I No. 356/2001, amounting
          Rp747.850.000     sesuai     dengan   SHT II                      to Rp747,850,000 according to SHT II
                                                                            No. 169/2007,      and     amounting     to

                                                          148
Page 152
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

            No. 169/2007 dan senilai Rp3.595.940.000                          Rp3,595,940,000 according to SHT III
            sesuai dengan SHT III No. 36/2016 (Catatan 16).                   No. 36/2016 (Note 16).

       h. Satu bidang tanah SHGB No. 1085 tanggal                        h. A plot of land with SHGB No. 1085 dated
          18 Desember 2006 sampai dengan 23 November                        December 18, 2006 until November 23,
          2026, seluas 1.404 m2, terletak di Kelurahan                      2026, an area of 1,404 sqm, located in
          Jemur    Wonosari,     Kecamatan     Wonocolo,                    Kelurahan Jemur Wonosari, Kecamatan
          Surabaya, Jawa Timur, atas nama Perusahaan                        Wonocolo, Surabaya, East Java, on
          senilai Rp2.665.700.000 sesuai dengan SHT I                       behalf of the Company amounting
          No. 2952/2007, senilai Rp 8.333.860.000 sesuai                    to    Rp2,665,700,000      according   to
          SHT II No. 333/2016 dan senilai Rp3.012.440.000                   SHT     I    No. 2952/2007,     amounting
          sesuai dengan SHT III No. 02656/2021 (Catatan                     Rp 8,333,860,000 according to SHT II
          16).                                                              No. 333/2016      and     amounting    to
                                                                            Rp3,012,440,000 according to SHT III
                                                                            No. 02656/2021 (Note 16).

       i.   Satu bidang tanah SHGB No. 82 tanggal                        i.   A plot of land with SHGB No. 82 dated
            20 Oktober 1988 sampai dengan 13 April 2028,                      October 20, 1988 to April 13, 2028, an area
            seluas 2.013 m2, terletak di Kelurahan                            of 2,013 sqm, located in Kelurahan
            Kalirungkut, Kota Surabaya, Jawa Timur, atas                      Kalirungkut, Surabaya City, East Java, on
            nama Perusahaan senilai Rp2.027.710.000                           behalf of the Company amounting to
            sesuai dengan SHT I No. 4772/2001, senilai                        Rp2,027,710,000 according to SHT I
            Rp2.474.390.000 sesuai dengan SHT II                              No.      4772/2001,       amounting      to
            No. 2948/2007, senilai Rp10.571.030.000 sesuai                    Rp2,474,390,000 according to SHT II
            dengan SHT III No. 00621/2016 dan senilai                         No.      2948/2007,       amounting      to
            Rp13.097.870.000 sesuai dengan SHT IV No.                         Rp10,571,030,000 according to SHT III
            02087/2021 (Catatan 16).                                          No. 00621/2016 and amounting to
                                                                              Rp13,097,870,000 according to SHT IV No.
                                                                              02087/2021 (Note 16).

       j.   Satu bidang tanah SHGB No. 2 tanggal                         j.   A plot of land with SHGB No. 2 dated
            25 Juni 1997 sampai dengan 7 Oktober 2036,                        June 25, 1997 until October 7, 2036, an area
            seluas 1.000 m2, terletak di Kelurahan Pasir                      of 1,000 sqm, located in Kelurahan Pasir
            Panjang, Kecamatan Kelapa Lima, Kota Kupang,                      Panjang, Kecamatan Kelapa Lima, Kupang
            Nusa Tenggara Timur, atas nama Perusahaan                         City, East Nusa Tenggara, on behalf of
            senilai Rp402.860.000 sesuai dengan SHT I                         the Company amounting to Rp402,860,000
            No. 390/2001 dan senilai Rp636.540.000 sesuai                     according to SHT I No. 390/2001 and
            dengan     SHT    II    No. 239/2007   senilai                    amount to Rp636,540,000 according to SHT
            Rp3.085.070.000 sesuai dengan SHT III                             II     No. 239/2007       amounting       to
            No. 1387/2015 dan senilai Rp2.359.530.000                         Rp3,085,070,000 according to SHT III
            sesuai dengan SHT IV No. 00968/2021                               No. 1387/2015       and    amounting      to
            (Catatan 16).                                                     Rp2,359,530,000 according to SHT IV No.
                                                                              00968/2021 (Note 16).

       k. Satu bidang tanah SHGB No. 24 tanggal                          k. A plot of land with SHGB No. 24 dated
          24 Oktober 1997 sampai dengan 7 Oktober 2037,                     October 24, 1997 until October 7, 2037, an
          seluas 595 m2, terletak di Kelurahan Oesapa,                      area of 595 sqm, located in Kelurahan
          Kecamatan Kelapa Lima, Kota Kupang, Nusa                          Oesapa, Kecamatan Kelapa Lima, Kupang
          Tenggara Timur, atas nama Perusahaan senilai                      City, East Nusa Tenggara, on behalf of
          Rp49.260.000     sesuai     dengan   SHT    I                     the Company amounting to Rp49,260,000
          No. 374/2001 dan senilai Rp39.740.000 sesuai                      according to SHT I No. 374/2001, amounting
          dengan SHT II No. 240/2007 dan senilai                            to Rp39,740,000 according to SHT II
          Rp538.000.000 sesuai dengan SHT III                               No. 240/2007      and     amounting      to
          No. 0970/2021 (Catatan 16).                                       Rp538,000,000 according to SHT III
                                                                            No. 0970/2021 (Note 16).

       l.   Satu bidang tanah SHGB No. 13 tanggal 22 Juli                l.   A plot of land with SHGB No. 13 dated
            1993 sampai dengan 22 Juli 2023, seluas                           July 22, 1993 until July 22, 2023, an area of
            4.830 m2, terletak di Jl. Eltari II Kecamatan                     4,830 sqm, located at Jl. Eltari II, Kecamatan
            Kupang Tengah, Kupang, Nusa Tenggara Timur,                       Kupang Tengah, Kupang, East Nusa
            atas nama Perusahaan senilai Rp457.590.000                        Tenggara, on behalf of the Company
                                                                              amounting     to     Rp457,590,000         dan

                                                          149
Page 153
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

           dan Rp288.000.000 sesuai dengan SHT I                              Rp288.000.000 according                  to    SHT       I
           No. 375/2001 (Catatan 16).                                         No. 375/2001 (Note 16).

       m. Satu bidang tanah SHGB No. 14 tanggal 22 Juli                  m. A plot of land with SHGB No. 14 dated
          1993 sampai dengan 22 Juli 2023, seluas                           July 22, 1993 until July 22, 2023, an area of
          4.800 m2, terletak di Jl. Eltari II Kecamatan                     4,800 sqm, located at Jl. Eltari II, Kecamatan
          Kupang Tengah, Kupang, Nusa Tenggara Timur,                       Kupang Tengah, Kupang, East Nusa
          atas nama Perusahaan senilai 457.590.000 dan                      Tenggara, on behalf of the Company
          Rp288.000.000 sesuai SHT I No. 375/2001,                          amounting     to     Rp457,590,000         and
          senilai Rp602.410.000 sesuai dengan SHT II                        Rp288,000,000 accoding to SHT I
          No. 238/2007 dan senilai Rp7.828.880.000                          No. 375/2011, Rp602,410,000 according to
          sesuai dengan SHT III No. 1386/2015 dan senilai                   SHT II No. 238/2007 and amounting
          Rp4.552.120.000 sesuai dengan SHT IV No.                          Rp7,828,880,000 according to SHT III
          00969/2021 (Catatan 16).                                          No.    1386/2015      and amounting to
                                                                            Rp4,552,120,000 according to SHT IV
                                                                            No. 00969/2021 (Note 16).

       n. Satu bidang tanah SHGB No. 24 tanggal                          n. A plot of land with SHGB No. 24 dated June
          11 Juni 1993 sampai dengan 25 Mei 2013, seluas                    11, 1993 until May 25, 2013, an area of 276
          276 m2, terletak di Kelurahan Tikala Ares,                        sqm, located in Kelurahan Tikala Ares,
          Kecamatan Wenang, Kota Manado, Sulawesi                           Kecamatan Wenang, Manado, North
          Utara,     atas     nama Perusahaan     senilai                   Sulawesi, on behalf of the Company
          Rp263.530.000,     sesuai    dengan   SHT I                       amounting to Rp263,530,000 according to
          No. 737/2001 dan senilai Rp121.670.000, sesuai                    SHT I No. 737/2001 and amounting to
          dengan SHT II No. 667/2007. SHGB tersebut                         Rp121,670,000 according to SHT II
          telah diperpanjang sampai dengan 25 Mei 2033                      No. 667/2007. The land right (SHGB) has
          dan senilai Rp1.704.800.000 sesuai dengan SHT                     been extended until May 25, 2033 and
          III No. 00984/2021 (Catatan 16).                                  amounting to Rp1,704,800,000 according to
                                                                            SHT III No. 00984/2021 (Note 16).

       o. Satu bidang tanah SHGB No. 1 tanggal                           o. A plot of land with SHGB No. 1 dated
          7 Januari 1992 sampai dengan 28 Desember                          January 7, 1992 until December 28, 2040,
          2040, seluas 4.040 m2, terletak di Desa Cileunyi                  an area of 4,040 sqm, located in Desa
          Wetan,    Kecamatan      Cileunyi,   Kabupaten                    Cileunyi Wetan, Kecamatan Cileunyi,
          Bandung, Jawa Barat, atas nama Perusahaan                         Kabupaten Bandung, West Java, on
          senilai Rp1.516.520.000, sesuai dengan SHT I                      behalf of the Company amounting
          No. 2927/2001, senilai Rp994.180.000 sesuai                       to     Rp1,516,520,000        according     to
          dengan SHT II No. 1613/2007 dan senilai                           SHT I No. 2927/2001, amounting to
          Rp3.182.880.000 sesuai dengan SHT III                             Rp994,180,000 according to SHT II
          No. 10710/2015 dan senilai Rp5.806.420.000                        No. 1613/2007       and      amounting      to
          sesuai dengan SHT IV No. 07540/2021. Tanah                        Rp3,182,880,000 according to SHT III
          yang dijaminkan termasuk bangunan dan segala                      No. 10710/2015 and amounting to
          sesuatu yang berada di atas tanah tersebut baik                   Rp5,806,420,000 according to SHT IV
          yang telah ada maupun yang akan ada (Catatan                      No. 07540/2021. Land which is pledged as
          16).                                                              collateral consisted of buildings and related
                                                                            things already existing in the land, or to will
                                                                            be exist there (Note 16).

       p. Satu bidang tanah SHGB No. 30 tanggal                          p. A plot of land with SHGB No. 30 dated
          26 Januari 2007 sampai dengan 26 Januari 2027,                    January 26, 2007 until January 26, 2027, an
          seluas 1.250 m2, terletak di Kelurahan Sumerta,                   area of 1,250 sqm, located in Kelurahan
          Kecamatan Denpasar Timur, Bali, atas nama                         Sumerta, Kecamatan Denpasar Timur,
          Perusahaan senilai Rp3.404.000.000 sesuai                         Bali, on behalf of the Company amounting to
          dengan     SHT     I    No. 2012/2007    senilai                  Rp3,404,000,000 according to SHT I
          Rp18.705.400.000 sesuai dengan SHT II                             No. 2012/2007            amounting         to
          No. 01546/2015 dan senilai Rp38.600.000 sesuai                    Rp18,705,400,000 according to SHT II
          dengan SHT III No. 03339/2021. Tanah yang                         No. 01546/2015 and amounting to
          dijaminkan termasuk bangunan dan segala                           Rp38,600,000 according to SHT III
          sesuatu yang berada di atas tanah tersebut, baik                  No. 03339/2021. Land which is pledged as
          yang telah ada maupun yang akan ada (Catatan                      collateral consisted of buildings and related
          16).

                                                          150
Page 154
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

                                                                              things already existing in the land, or to will
                                                                              be exist there (Note 16).

       q. Satu bidang tanah SHGB No. 1 tanggal                           q. A plot of land with SHGB No. 1 dated
          13 November 1987 sampai dengan 13 Oktober                         November 13, 1987 until October 13, 2027,
          2027, seluas 1.905 m2, terletak di Jl. P. Antasari                an area of 1,905 sqm, located in Jl. P.
          No. 1/4, Tanjung Baru, Bandar Lampung atas                        Antasari No. 1/4, Tanjung Baru, Bandar
          nama Perusahaan senilai Rp30.000.000 sesuai                       Lampung, on behalf of the Company
          dengan S. Hip No. 3181 tanggal 13 September                       amounting to Rp30,000,000 according to S.
          1989 , senilai Rp2.222.100.000 sesuai dengan                      Hip No. 3181 dated September 13, 1989,
          SHT     II    No. 01057/2007       dan     senilai                amounting to Rp2,222,100,000 according to
          Rp3.642.670.000 sesuai dengan SHT III                             SHT II No. 01057/2007 and amounting to
          No. 02119/2016 dan senilai Rp2.993.230.000                        Rp3,642,670,000 according to SHT III
          sesuai dengan SHT IV No. 01882/2021                               No. 02119/2016 and amounting to
          (Catatan 16).                                                     Rp2,993,230,000 according to SHT IV
                                                                            No. 01882/2021 (Note 16).

       r. Kendaraan bermotor yang terdiri dari 1 (satu) unit             r. Vehicles consisting of 1 (one) unit VW
          VW Caravelle 2.0 tahun 2012, yang diikat fidusia                  Caravelle 2.0 year 2012 tied by fiduciary in
          sesuai Akta Pemberian Jaminan Fidusia Atas                        accordance to Fiduciary Guarantee Deed
          Kendaraan No. W.10.00426020. AH.05.01                             No.    W.10.00426020.AH.05.01         dated
          tanggal    26      Oktober      2015       senilai                October    26,    2015     amounting      to
          Rp620.000.000 (Catatan 16).                                       Rp620,000,000 (Note 16).

   •   PT Bank Rakyat Indonesia (Persero) Tbk, jaminan               •   PT Bank Rakyat Indonesia (Persero) Tbk,
       berupa sebidang tanah dengan SHGB No. 655                         collateral in the form of a piece of land with land
       dengan masa berlaku dari tanggal 7 Januari 1992                   right (SHGB) No. 655 dated January 7, 1992
       sampai dengan 8 Mei 2033 yang telah diikat hak                    until May 8, 2033 that have been tied with its
       tanggungan    dengan   nilai  Rp25.000.000.000                    guarantee          rights      amounting          to
       (Catatan 16).                                                     Rp25,000,000,000 (Note 16).

       Pada tangal 30 Juni 2023, saldo pinjaman                          As of June 30, 2023, the Company's loan
       Perusahaan dari PT Bank Mandiri (Persero) Tbk                     balance from PT Bank Mandiri (Persero) Tbk
       adalah sebesar Rp4.555.366.264.204; PT Bank                       amounting to Rp4,555,366,264,204; PT Bank
       Rakyat     Indonesia    (Persero)  Tbk    sebesar                 Rakyat Indonesia (Persero) Tbk amounting to
       Rp2.695.686.687.518; PT Bank Negara Indonesia                     Rp2,695,686,687,518; PT Bank Negara
       (Persero) Tbk sebesar Rp7.526.905.037.356;                        Indonesia (Persero) Tbk amounting to
       PT      Bank     Syariah     Indonesia    sebesar                 Rp7,526,905,037,356; PT Bank Syariah
       Rp2.035.361.522.506, PT Bank BTPN Tbk adalah                      Indonesia amounting to Rp2,035,361,522,506,
       sebesar Rp2.276.032.811.377; PT Bank Pan                          PT    Bank    BTPN    Tbk    amounting   to
       Indonesia Tbk sebesar Rp1.937.854.730.295; Bank                   Rp2,276,032,811,377; PT Bank Pan Indonesia
       of China Ltd sebesar Rp1.140.424.112.008; PT Bank                 Tbk amounting to Rp1,937,854,730,295; Bank
       Pembangunan Daerah Jawa Barat dan Banten Tbk                      of     China      Ltd      amounting     to
       sebesar Rp998.222.785.772; PT Shinhan Bank                        Rp1,140,424,112,008; PT Bank Pembangunan
       Indonesia sebesar Rp238.064.217.020; PT Bank                      Daerah Jawa Barat dan Banten Tbk amounting
       UOB Indonesia sebesar Rp251.102.529.990; PT                       to Rp998,222,785,772; PT Shinhan Bank
       Bank     Maybank      Indonesia    Tbk    sebesar                 Indonesia amounting to 251,102,529,990;
       Rp500.000.000.000; PT Bank Permata Tbk sebesar                    PT Bank UOB Indonesia amounting to
       Rp 699.599.183.062; Bank QNB Indonesia sebesar                    Rp238,064,217,020; PT Bank Maybank
       Rp 417.796.279.058; PT Bank KEB Hana Indonesia                    Indonesia       Tbk       amounting      to
       sebesar Rp 281.805.760.004; PT Bank OCBC NISP                     Rp500,000,000,000; PT Bank Permata Tbk
       Tbk sebesar Rp281.805.760.004; PT Bank DKI                        amounting to Rp699,599,183,062; Bank QNB
       sebesar Rp235.000.000.000; PT Bank China                          Indonesia amounting to Rp417,796,279,058;
       Construction Bank Indonesia Tbk sebesar                           PT Bank KEB Hana Indonesia amounting to
       Rp225.444.608.003; PT Bank CTBC Indonesia                         Rp281,805,760,004; PT Bank OCBC NISP Tbk
       sebesar Rp169.083.456.002; PT Bank BNP Paribas                    amounting to Rp281,805,760,004; PT Bank DKI
       Indonesia adalah sebesar Rp154.781.999.763; PT                    amounting to Rp235,000,000,000; PT Bank
       Bank Resona Perdania Indonesia sebesar                            China Construction Bank Indonesia Tbk
       Rp167.137.162.274; PT Bank SBI Indonesia sebesar                  amounting to Rp225,444,608,003; PT Bank
       Rp84.541.728.001.                                                 CTBC        Indonesia      amounting     to
                                                                         Rp169,083,456,002; PT Bank BNP Paribas

                                                          151
Page 155
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

                                                                         Indonesia     adalah     amounting      to
                                                                         Rp154,781,999,763; PT Bank Resona Perdania
                                                                         Indonesia amounting to Rp167,137,162,274;
                                                                         PT Bank SBI Indonesia amounting to
                                                                         Rp84,541,728,001.

       Pada    tangal    31   Desember    2022,    saldo                 As of December 31, 2022, the Company's loan
       pinjaman Perusahaan dari PT Bank Mandiri                          balance from PT Bank Mandiri (Persero) Tbk
       (Persero) Tbk adalah sebesar Rp4.554.941.232.258;                 amounting to Rp4,554,941,232,258; PT Bank
       PT Bank Rakyat Indonesia (Persero) Tbk sebesar                    Rakyat Indonesia (Persero) Tbk amounting to
       Rp2.663.789.519.937; PT Bank Negara Indonesia                     Rp2,663,789,519,937; PT Bank Negara
       (Persero) Tbk sebesar Rp7.526.905.037.356; PT                     Indonesia (Persero) Tbk amounting to
       Bank      Syariah    Indonesia    Tbk     sebesar                 Rp7,526,905,037,356; PT Bank Syariah
       Rp2.035.361.522.506.                                              Indonesia      Tbk        amounting      to
                                                                         Rp2,035,361,522,506.

   2. Sindikasi Kredit Modal Kerja PT Bank Mandiri                  2.    Working   Capital    Syndication   Credit
      (Persero) Tbk, PT Bank BNI (Persero) Tbk dan                        PT   Bank     Mandiri    (Persero)  Tbk,
      PT Bank BRI (Persero) Tbk                                           PT Bank BNI (Persero) Tbk dan
                                                                          PT Bank BRI (Persero) Tbk

       Berdasarkan akta Notaris Ashoya Ratam, S.H., M.Kn                 Based on the deed of Notary Ashoya Ratam,
       No. 38 tanggal 25 Oktober 2021, Perusahaan                        S.H., M.Kn. No. 38 dated October 25, 2021,
       menandatangani perjanjian Kredit Sindikasi dengan                 the Company signed a Syndicated Loan
       PT Bank Mandiri (Persero) Tbk, PT Bank BNI                        agreement with PT Bank Mandiri (Persero) Tbk,
       (Persero) Tbk dan PT Bank BRI (Persero) Tbk. Bank                 PT Bank BNI (Persero) Tbk and PT Bank BRI
       Kreditur tersebut memberikan fasilitas kredit sebesar             (Persero) Tbk. The creditor bank provides a
       Rp8.076.463.000.000 dengan sublimit Non Cash                      credit facility of Rp8,076,463,000,000 with a
       Loan sampai dengan Rp6.268.359.000.000 dan                        Non-Cash       Loan    sublimit     of   up   to
       Supplier       Financing      sampai          dengan              Rp6,268,359,000,000 and Supplier Financing
       Rp6.268.359.000.000. Jangka waktu pinjaman ini                    sublimit of up to Rp6,268,359,000,000.
       maksimal tiga tahun sejak penandatanganan kontrak                 The term of this loan is a maximum of three
       perjanjian dan suku bunga sebesar referance rate                  years from the signing of the contract agreement
       ditambah margin. Fasilitas Kredit ini diberikan                   and the interest rate is the reference rate plus
       Kreditur untuk digunakan sebagai modal kerja untuk                margin. This credit facility is provided by
       pelaksaan Proyek dalam rangka Program Pemulihan                   creditors to be used as working capital for
       Ekonomi      Nasional.   Pinjaman       ini    dijamin            project implementation in the context of the
       oleh Jaminan Pemerintah sesuai ketentuan                          National Economic Recovery Program. This
       Peraturan Menteri Keuangan Republik Indonesia                     loan is guaranteed by Government Guarantee in
       No. 211/PMK.08/2020.                                              accordance with the Regulation of the Minister
                                                                         of Finance of the Republic of Indonesia
                                                                         No. 211/PMK.08/2020.

       Berdasarkan akta pemindahan tanggal 28 Juni 2022,                 Based on the deed of transfer dated June 28,
       PT Bank BNI (Persero) Tbk mengalihkan sebagian                    2022, PT Bank BNI (Persero) Tbk transferred its
       hak-haknya dan kewajibannya bedasarkan Perjanjian                 rights and obligations based on the Syndicated
       Kredit Sindikasi kepada Bank Pembangunan Daerah                   Credit Agreement to Bank Pembangunan
       Jawa Barat dan Banten Tbk dan PT Bank Sumut.                      Daerah Jawa Barat Tbk and PT Bank Sumut.
       Kewajiban dan hak yang diambil alih Bank                          Obligations and rights taken over by Bank
       Pembangunan Daerah Jawa Barat dan Banten Tbk.                     Pembangunan Daerah Jawa Barat Tbk mainly
       terutama meliputi komitmen berdasarkan Perjanjian                 include commitments under the Syndicated
       Kredit Sindikasi sebesar Rp118.608.226.840, hak                   Credit      Agreement        amounting       to
       atas jumlah pinjaman yang telah dicairkan dan belum               Rp118,608,226,840, the rights to the loan
       dibayarkan Perusahaan sebesar Rp131.391.773.160                   amount that have been disbursed and have not
       dan bunga berdasarkan perjanjian Kredit Sindikasi.                been paid by the Company amounting to
       Kewajiban dan hak yang diambil alih PT Bank Sumut                 Rp131,391,773,160 and interest based on
       terutama meliputi komitmen berdasarkan Perjanjian                 the      Syndicated      Credit     agreement.
       Kredit Sindikasi sebesar Rp35.754.841.279, hak atas               The obligations and rights taken over by
       jumlah pinjaman yang telah dicairkan dan belum                    PT Bank Sumut mainly include commitments
       dibayarkan Perusahaan sebesar Rp64.245.158.721                    under the Syndicated Credit Agreement
       dan bunga berdasarkan perjanjian Kredit Sindikasi.                amounting to Rp35,754,841,279, rights to the

                                                          152
Page 156
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

                                                                         loan amount that has been disbursed and has
                                                                         not been paid by the Company amounting to
                                                                         Rp64,245,158,721 and interest based on
                                                                         the Syndicated Credit agreement.

        Pada tanggal 30 Juni 2023, saldo pinjaman                        As of June 30, 2023, the Company's loan
        Perusahaan dari PT Bank Mandiri (Persero) Tbk                    balance from PT Bank Mandiri (Persero) Tbk
        adalah sebesar Rp3.394.448.115.562; PT Bank                      amounting to Rp3,394,448,115,562; PT Bank
        Rakyat    Indonesia    (Persero)  Tbk    sebesar                 Rakyat Indonesia (Persero) Tbk amounting to
        Rp1.191.071.578.925; PT Bank Negara Indonesia                    Rp1,191,071,578,925; PT Bank Negara
        (Persero) Tbk sebesar Rp312.864.920.200; PT Bank                 Indonesia (Persero) Tbk amounting to
        Pembangunan Daerah Jawa Barat dan Banten Tbk                     Rp312,864,920,200. PT Bank Pembangunan
        sebesar      Rp190.116.968.257;     PT      Bank                 Daerah Jawa Barat dan Banten Tbk amounting
        Pembangunan Daerah Sumatera Utara sebesar                        to Rp190,116,968,257; PT Bank Pembangunan
        Rp189.632.090.304.                                               Daerah Sumatera Utara amounting to
                                                                         Rp189,632,090,304.

        Pada tanggal 31 Desember 2022, saldo                             As of December 31, 2022, the Company's loan
        pinjaman Perusahaan dari PT Bank Mandiri                         balance from PT Bank Mandiri (Persero) Tbk
        (Persero) Tbk adalah sebesar Rp2.457.367.990.065;                amounting      to      Rp2,457,367,990,065;
        PT Bank Rakyat Indonesia (Persero) Tbk sebesar                   PT Bank Rakyat Indonesia (Persero) Tbk
        Rp1.830.326.590.007; PT Bank Negara Indonesia                    amounting      to      Rp1,830,326,590,007;
        (Persero) Tbk sebesar Rp422.238.336.697.                         PT Bank Negara Indonesia (Persero) Tbk
                                                                         amounting to Rp422,238,336,697.

   Entitas Anak – WTR                                                Subsidiary – WTR

   Perjanjian Kredit Modal Kerja Non Sindikasi                       Non Syndication              Working         Capital      Credit
                                                                     Agreement

   1.   PT Bank Rakyat Indonesia (Persero) Tbk                      1.    PT Bank Rakyat Indonesia (Persero) Tbk

        a. Kredit Non Sindikasi TJT                                      a. Non-Syndicated Credit TJT

           Berdasarkan Akta No. 86 tanggal 29 Mei 2015                        Based on Deed No. 86 dated May 29,
           dari Muchlis Patahna, S.H., MKn, Notaris di                        2015 of Muchlis Patahna, S.H., MKn, Notary
           Jakarta, TJT dan PT Bank Rakyat Indonesia                          in Jakarta, TJT and PT Bank Rakyat
           (Persero) Tbk menandatangani perjanjian kredit                     Indonesia (Persero) Tbk signed a loan
           dengan fasilitas kredit maksimum sebesar                           agreement providing a loan facilities
           Rp1.915.000.000.000 yang terdiri dari kredit                       with a maximum of Rp1,915,000,000,000
           investasi dan kredit bunga masa konstruksi                         which consists of investment and
           masing-masing sebesar Rp1.754.000.000.000                          interest      credit  during     constructions
           dan Rp161.000.000.000. Kedua fasilitas tersebut                    amounting to Rp1,754,000,000,000 and
           diberikan untuk keperluan pembangunan Jalan                        Rp161,000,000,000, respectively. Both of
           Tol Ruas Ciawi - Sukabumi seksi 1 (Ciawi -                         loan facilities were provided for construction
           Cigombong) 15,35 Km.                                               of Ciawi-Sukabumi Toll Road section 1
                                                                              (Ciawi-Cigombong) 15.35 Km.

           Berdasarkan addendum terakhir sesuai dengan                        Based on latest addendum as stated in
           Akta No. 23 tanggal 28 Juli 2020 oleh Dr. Dewi                     Notarial Deed No. 23 dated July 28, 2020 by
           Tenty Septi Artiany S.H., M.H., M.Kn., di Jakarta,                 Dr. Dewi Tenty Septu Artianty, S.H., M.Kn.,
           TJT dan PT Bank Rakyat Indonesia (Persero)                         in Jakarta, TJT and PT Bank Rakyat
           sepakat untuk mengubah beberapa ketentuan                          Indonesia (Persero) Tbk agreed to change
           diantaranya:                                                       clauses as follow:

           a) Mengubah suku bunga fasilitas Kredit                           a) Changing loan interest of Investment
              Investasi dan Interest During Construction                        Credit and Interest During Construction to
              menjadi 9% terhitung sejak addendum ini                           9% starting from the signing of this
              ditandatangani hingga 31 Desember 2020,                           addendum until December 31, 2020, and
              dan    menetapkan suku       bunga   10%                          will apply 10% (reviewable) of interest
              (reviewable) mulai tanggal 1 Januari 2021

                                                          153
Page 157
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

               sampai dengan jatuh tempo fasilitas kredit,                       rate starting January 1, 2021 until
               dan                                                               the maturity of the credit facility, and
            b) Angsuran pokok jatuh tempo Agustus 2028                        b) The principal installment is due in August
               dan membayar angsuran sesuai dengan                               2028 and pays the installments according
               jadwal yang ditentukan                                            to the specified schedule

            Berdasarkan addendum terakhir sesuai dengan                       Based on the latest addendum in
            Akta No. 24 Notaris Desi Tenty Septi Artianty                     accordance with Deed No. 24 Notary Desi
            S.H., M.H., M.Kn., tanggal 28 Juli 2021 kedua                     Tenty Septi Artianty S.H., M.H., M.Kn., dated
            belah pihak menyetujui untuk mengubah                             July 28, 2021, both parties agreed to amend
            ketentuan diantaranya:                                            the provisions including:

            •
            Plafond              Efektif         sebesar                      •  Effective            Ceiling             of
            Rp1.825.334.314.130;                                                 Rp1,825,334,314,130;
         • Suku bunga 9% p.a dengan ketentuan sebagai                         • Interest rate of 9% p.a with the following
            berikut:                                                             conditions:
            - 3% (tiga persen) p.a berlaku sampai                                - 3% (three percent) p.a valid until
                 dengan 30 Maret 2022. Pembayaran                                     March 30, 2022. Interest payments
                 bunga dilakukan setiap triwulan yaitu di                             are made quarterly in June 2021,
                 bulan Juni 2021, September 2021,                                     September 2021, December 2021
                 Desember 2021 dan Maret 2022.                                        and March 2022.
            - 6% (enam persen) p.a ditunda sampai                                - 6% (six percent) p.a postponed until
                 dengan 30 Maret 2022 dan dibayar setiap                              March 30, 2022 and paid quarterly
                 triwulan mulai Juni 2022 sampai dengan                               from June 2022 to March 2025 on a
                 Maret 2025 secara pro rate.                                          pro rate basis.
       Suku bunga bersifat reviewable, ketentuan suku                     Interest rates are reviewable, these interest rate
       bunga ini mulai berlaku sejak 1 Mei 2021.                          provisions come into effect from May 1, 2021.

       Pada tanggal 21 November 2022, berdasarkan surat                   On November 21, 2022, based on letter number
       nomor R.II.228-CRO/COD/11/2022, PT Bank Rakyat                     R.II.228-CRO/COD/11/2022, PT Bank Rakyat
       Indonesia (Persero) Tbk memberikan putusan                         Indonesia (Persero) Tbk gave a credit
       persetujuan restrukturisasi kredit kepada PT TJT                   restructuring approval decision to PT TJT with
       dengan syarat-syarat kredit sebagai berikut:                       the following credit terms:

        •        Plafond efektif sebesar Rp1.822.612.814.130;             •     Effective ceiling of Rp1,822,612,814,130;
        •        Penjadwalan kembali angsuran pokok;                      •     Rescheduling Principal Installment
        •        Suku bunga dengan skema Staging Interest                 •     Staging Interest with following conditions :
                 dengan ketentuan:                                             - 3% effective September 2022 – Maret
                - 3% berlaku September 2022 – Maret 2023;                           2023;
                - 3.5% berlaku April 2023 – Desember 2023;                     - 3,5% effective April 2023 – December
                - 4% berlaku selama tahun 2024;                                     2023;
                - 4.5% berlaku selama tahun 2025;                              - 4% effective during 2024;
                - 5.5% berlaku selama tahun 2026;                              - 4,5% effective during 2025;
                - 6.5% berlaku selama tahun 2027;                              - 5,5% effective during 2026;
                - 7.5% berlaku selama tahun 2028;                              - 6,5% effective during 2027;
                - 12.85% berlaku selama tahun 2029 – 2038.                     - 7,5% effective during 2028;
        •        Jangka waktu perjanjian diperpanjang hingga                   - 12,85% effective during 2029 – 2038.
                 2038.                                                    •     Extent the maturity date until 2038.

       Suku bunga bersifat reviewable, ketentuan suku                     Interest rates are reviewable, these interest rate
       bunga ini mulai berlaku sejak September 2022.                      provisions come into effect from September
                                                                          2022.

       Berdasarkan Akta notaris Sriyani Burlian, S.H                      Based on Notarial deed No. 34 of Sriyani
       No. 34 tanggal 31 Mei 2018, TJT memperoleh                         Burlian, S.H., dated May 31, 2018, TJT obtained
       Fasilitas Pinjaman non-revolving dengan pagu                       nonrevolving credit facility with a maximum
       pinjaman sebesar Rp2.078.065.000.000 yang                          credit of Rp2,078,065,000,000 which consist of
       terdiri dari Tranche I Rp500.000.000.000 dan                       Tranch I Rp500,000,000,000 and Tranch II of


                                                          154
Page 158
                                                                    The original consolidated financial statements included herein are in
                                                                                                               the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                               PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                         AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                           NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                     FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                            AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                   MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                       (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)           (Expressed in full Rupiah amount, unless otherwise stated)

         Tranche     II   Rp1.578.065.000.000.       Fasilitas             Rp1,578,065,000,000. The purpose of this
         pinjaman ini diberikan untuk dana talangan                        credit is for bailout of land acquisition. The loan
         pembebasan tanah. Jangka waktu fasilitas kredit                   facility terms valid from the signing date of
         terhitung sejak ditandatanganinya akta sampai                     agreement and will last until May 31, 2020 for
         dengan tanggal 31 Mei 2020 untuk Tranch I dan                     Tranch I and November 28, 2020 for Tranch II
         28 November 2020 untuk Tranch II dengan tingkat                   with bearing interest at 8.25% per annum.
         suku bunga sebesar 8,25% per tahun. Berdasarkan                   Based on Deed No.24 dated July 28, 2020 by
         akta No. 24 tanggal 28 Juli 2020 oleh Notaris                     Notary Dr. Dewi Tenty Sept Artiany, SH, Mh,
         Dr. Dewi Tenty Septi Artiany, SH, Mh, M.Kn di Jakarta             M.Kn in Jakarta, the term agreement for Tranch
         jangka waktu fasilitas pinjaman Tranch II                         II has been extended until November 28, 2021.
         diperpanjang hingga 28 November 2021.

         Pada tanggal 30 Juni 2023 dan 31 Desember 2022,                  As of June 30, 2023 and December 31, 2022,
         saldo kredit investasi TJT dari PT Bank Rakyat                   the balance of investment credit of TJT from PT
         Indonesia (Persero) Tbk masing-masing sebesar                    Bank Rakyat Indonesia (Persero) Tbk
         Rp1.763.352.111.497 dan Rp1.783.008.602.759.                     amounting to Rp1,763,352,111,497 and
                                                                          Rp1,783,008,602,759, respectively.

         Pada tanggal 30 Juni 2023 dan 31 Desember 2022,                  As of June 30, 2023 and December 31, 2022,
         saldo kredit IDC dari TJT dari PT Bank Rakyat                    the balance of IDC credit loan of TJT from
         Indonesia (Persero) Tbk masing-masing sebesar                    PT Bank Rakyat Indonesia (Persero) Tbk
         Rp113.513.922.643 dan Rp113.703.922.643.                         amounting    to   Rp113,513,922,643    and
                                                                          Rp113,703,922,643, respectively.

   Perjanjian Kredit Modal Kerja Sindikasi                            Syndication Working Capital Credit Agreement

   1.    PT Bank Negara Indonesia (Persero) Tbk                      1.    PT Bank Negara Indonesia (Persero) Tbk

    a.    Kredit Bank Sindikasi PBTR                                  a. Syndication Bank Credit PBTR

         Berdasarkan Akta Notaris Ariani Lakhsmijati Rachim,              Based on Notarial Deed No.37 dated May 24,
         S.H., No. 37 tanggal 24 Mei 2017 dan Akta Notaris                Based on Notarial Deed No. 37 of Ariani
         Ariani Lakhsmijati Rachim, S.H., No. 48 tanggal 27               Lakhsmijati Rachim, S.H., dated May 24, 2017
         Agustus 2018, PBTR telah menandatangani                          and Notarial Deed No. 48 of Ariani Lakhsmijati
         perjanjian Kredit Sindikasi dengan PT Bank Negara                Rachim S.H., dated August 27, 2018, PBTR
         Indonesia (Persero) Tbk, PT Bank Panin Tbk,                      entered into Syndicated Loan Agreement with
         PT Bank Papua, PT Bank Pembangunan Daerah                        PT Bank Negara Indonesia (Persero) Tbk,
         Sulawesi     Selatan     dan      Sulawesi    Barat,             PT Bank Panin Tbk, PT Bank Papua, PT Bank
         PT Bank Arta Graha Internasional Tbk,                            Pembangunan Daerah Sulawesi Selatan dan
         PT Bank Pembangunan Daerah Maluku dan Maluku                     Sulawesi Barat, PT Bank Arta Graha
         Utara, PT Bank Pembangunan Daerah Daerah                         Internasional Tbk, PT Bank Pembangunan
         Istimewa Yogyakarta, PT Bank Pembangunan                         Daerah     Maluku    dan     Maluku     Utara,
         Daerah Jambi, PT Bank Nagari, PT Bank                            PT Bank Pembangunan Daerah Daerah
         Pembangunan        Daerah     Kalimantan    Tengah,              Istimewa Yogyakarta, PT Bank Pembangunan
         PT      Bank      Pembangunan        Daerah    Bali,             Daerah      Jambi,    PT     Bank     Nagari,
         PT Bank Pembangunan Daerah Sumatera Utara,                       PT Bank Pembangunan Daerah Kalimantan
         PT Bank Pembangunan Daerah Jawa Tengah,                          Tengah, PT Bank Pembangunan Daerah Bali,
         PT Bank Negara Indonesia Syariah, PT Bank Jabar                  PT Bank Pembangunan Daerah Sumatera
         Banten Syariah, PT Bank Aceh Syariah,                            Utara, PT Bank Pembangunan Daerah Jawa
         PT Indonesia Infrastructure Finance, PT Bank Riau                Tengah, PT Bank Negara Indonesia Syariah,
         Kepri, Bank Sumsel Babel, PT Pembangunan                         PT Bank Jabar Banten Syariah, PT Bank Aceh
         Daerah Kalimantan Selatan, PT Pembangunan                        Syariah, PT Indonesia Infrastructure Finance,
         Daerah Sulawesi Tengah, PT Bank Pembangunan                      PT Bank Riau Kepri, Bank Sumsel Babel,
         Daerah Istimewa Yogyakarta Syariah, PT Bank Riau                 PT Pembangunan Daerah Kalimantan Selatan,
         Kepri Syariah dan PT Bank Kalsel Syariah.                        PT Pembangunan Daerah Sulawesi Tengah,
                                                                          PT Bank Pembangunan Daerah Istimewa
                                                                          Yogyakarta Syariah, PT Bank Riau Kepri
                                                                          Syariah dan PT Bank Kalsel Syariah.

         Jangka waktu kredit investasi dan kredit interest                 The investment credit and interest during
         during construction (IDC) adalah 162 bulan atau                   construction credit term loan was 162 months or

                                                          155
Page 159
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

       14 tahun termasuk masa tenggang 24 bulan atau                      14 years including a grace period of
       2 tahun sejak tanggal efektif. Suku bunga yang                     24 months or 2 years from the effective date.
       dikenakan adalah sebesar 10% per tahun yang                        The interest rate of this loan is 10% p.a which
       merupakan rata-rata tertimbang atas dasar suku                     represents the weighted average interest rate
       bunga yaitu Reference Rate (LPS) ditambah dengan                   based on the Reference Rate (LPS) plus
       Margin.                                                            Margin.

       Keduapuluh empat bank tersebut memberikan                          These twenty four banks provided a credit
       fasilitas     kredit     maksimum       sebesar                    facility with a maximum credit facility limit of
       Rp5.248.541.000.000 yang terdiri dari Kredit                       Rp5,248,541,000,000           which     consists
       Investasi dan Kredit Bunga masa Konstruksi (IDC)                   of      Investment     Credit     and    Interest
       masing-masing sebesar Rp4.919.070.000.000 dan                      During      Construction     (IDC)    amounting
       Rp329.471.000.000. Kedua fasilitas tersebut                        to            Rp4,919,070,000,000            and
       diberikan untuk keperluan pembangunan Jalan Tol                    Rp329,471,000,000, respectively. Both facilities
       Ruas Pemalang – Batang.                                            are provided for the development of Pemalang -
                                                                          Batang Toll Road.

       Pada tanggal 21 Desember 2021, PT Bank Negara                      On December 21, 2021, PT Bank Negara
       Indonesia Persero (Tbk) memberikan surat dengan                    Indonesia Persero (Tbk) issued a letter
       No: SSK/3.2/4251 mengenai Persetujuan Perubaha                     No: SSK/3.2/4251 regarding the approval of
       Fasilitas Kredit Sindikasi proyeksi jalan Tol Ruas                 the change in the projected syndicated credit
       Pemalang     Batang dengan ketentuan           dan                 facility for the Pemalang Batang Toll Road with
       persyaratan sebagai berikut:                                       the following terms and conditions:

        1.   Project Cost : Maksimal Rp7.406.794.586.675.                1. Project          Cost         :        Maximum
                                                                            Rp7,406,794,586,675.
        2.   Komposisi pembiayaan : KI : Self financing =                2. Financing Material : KI : Self-financing =
             74,63% : 25,37%.                                               74.63% : 25.37%.
        3.   Tujuan pembiayaan :                                         3. Purpose of financing:
             - Restrukturisasi pinjaman debitur yang                        - Debtor credit restructuring used to
                 digunakan untuk membiayai 74,63% Biaya                         finance 74.63% of the investment costs
                 Investasi Proyek Pembangunan Jalan Tol                         for the Pemalang – Batang Toll Road
                 Ruas Pemalang – Batang.                                        Construction Project.
             - Pembayaran utang kontraktor dan/atau                         - Payment of contractor debt and/or BLU
                 utang BLU dan/atau biaya pemeliharaan                          debt and/or road maintenance costs in
                 jalan tol sehubungan dengan pengelolaan                        connection with the management of
                 jalan tol ruas Pemalang – Batang sepanjang                     the Pemalang – Batang toll road along ±
                 ± 39,2 KM (“Proyek”).                                          39.2KM (the “Project”).
        4.   Fasilitas pembiayaan : Kredit Investasi yang                4. Financing facilities: Investment Credit which
             terdiri dari 3 Tranchers yaitu :                               consists of 3 stages, namely:
             a. Tranche A : pembiayaan investasi dengan                     a. Tranche A: investment financing with a
                 skema staging interest (skema bunga                            staging interest scheme (tiered interest
                 berjenjang).                                                   scheme).
             b. Tranche B : pembiayaan investasi dengan                     b. Tranche B : investment financing with
                 skema deferred interest (penundaan bunga                       deferred interest scheme (partial interest
                 sebagian).                                                     deferral).
             c. Tranche C : pembiayaan baru dari SMI                        c. Tranche C : new financing from SMI
                 Syariah untuk keperluan pembiayaan                             Syariah for investment purposes with a
                 investasi dengan skema bagi hasil step up                      profitsharing scheme to increase
                 dan ditangguhkan sebagian.                                     financing and partly.
        5.   Limit fasititas : Total limit KI dan KI IDC                 5. Facility limit: The total limit of KI and KI IDC
             maksimal sebesar 74,63% dari Project Cost.                     is a maximum of 74.63% of the Project Cost.
             Sesuai outstanding pokok pinjaman sindikasi                    In accordance with the principal of
             dan adanya tambahan fasilitas dari SMI Syariah                 the syndicated loan and additional facilities
             atau               maksimal            sebesar                 from SMI Syariah or a maximum of
             Rp5.649.094.903.160.                                           Rp5,649.094,903,160.
        6.   Jangka Waktu Fasilitas :                                    6. Term of Facility:
             - Tranche A dan Tranche B                                      - Tranche A and Tranche B
                 Maksimal 15 tahun sejak penandatangan                          Maximum of 15 years since the signing
                 Amendemen perjanjian kredit atau berakhir                      of the credit agreement amendment or
                 pada tahun 2036.                                               ending in 2036.

                                                          156
Page 160
                                                                      The original consolidated financial statements included herein are in
                                                                                                                 the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                 PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                           AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                       FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                              AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                     MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                         (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)             (Expressed in full Rupiah amount, unless otherwise stated)

              -  Tranche C                                                       - Tranche C
                 Maksimal 18 tahun sejak penandatangan                             Maximum 18 years from the signing of
                 Amendeman perjanjian pembiayaan atau                              the Amendment to the financing
                 berakhir pada tahun 2039.                                         agreement or ending in 2039.
        7.    Grace Period : Tranche C 6 tahun sejak di                     7. Grace Period: Tranche C 6 years from
              tandatangani perjanjian kredit pembiayaan                        the signing of the financing credit agreement
              hingga Oktober 2027.                                             until October 2027.
        8.    Masa Penarikan : Tranche C 4 tahun sejak                      8. Withdrawal Period: Tranche C 4 years from
              penandatangan perjanjian pembiayaan atau                         the signing of the financing agreement or
              sesuai pembayaran utang BLU, dipilih mana                        according to the payment of BLU debt,
              yang lebih dahulu terjadi.                                       whichever occurs first.
        9.    Suku bunga/ Bagi Hasil :                                      9. Interest rate/ Profit Sharing :
              a. Bunga berjenjang dengan rincian :                              a. Tiered interest with details:
                 - Tahun 2021 sampai dengan 2023                                     - Year 2021 to 2023 by 5%.
                     sebesar 5%.                                                     - Year 2024 to 2025 amounting to
                 - Tahun 2024 sampai dengan 2025                                         6.25% p.a.
                     sebesar 6,25% p.a.
              b. Untuk periode selanjutnya tahun 2026                                b.   For the next period from 2026 to 2036
                 sampai dengan 2036 bunga berjenjang                                      the    tiered    interest   will   be
                 menjadi sebesar Reference Rate+Margin                                    the Reference Rate+Margin or equal to
                 atau sama dengan (10,63).                                                (10.63).

       Pinjaman tersebut di atas dijamin dengan seluruh hak                  The above loans are collateralized by all of toll
       konsesi pengusahaan jalan tol, seluruh tagihan dan                    road concessions rights, all invoices and
       pendapatan operational dari pengelolaan jalan tol                     operating revenues from toll road management
       dan usaha usaha lain terkait dengan pengelolaan                       and other business ventures related to toll road
       jalan tol, escrow account, tagihan atas pendapatan                    management, escrow accounts, claims for
       dari hasil klaim asuransi, klaim bank garansi, dan                    income from insurance claims, bank guarantee
       penggantian dana dari pemerintah, gadai saham                         claims and reimbursement of funds from
       milik pemegang saham, serta company guarantee                         the government, the shareholders' pledge of
       dari para pemegang saham. Perjanjian pinjaman juga                    shares, and the company guarantee of
       mencakup persyaratan tertentu antara lain:                            the shareholders. The loan agreement also
       membatasi hak Perusahaan untuk memperoleh                             covers certain requirements such as: limiting
       kredit/fasilitas baru, mengubah sususan pemegang                      the Company's right to obtain new credits/
       saham, melakukan perubahan PPJT dan atau                              facilities, changing shareholder structure,
       business plan, serta mengharuskan Perusahaan                          making changes to the PPJT and/or business
       untuk mempertahankan rasio keuangan tertentu                          plan, and requires the Company to maintain
       yang dihitung berdasarkan laporan keuangan                            certain financial ratios calculated based on
       Perusahaan.                                                           the Company financial statement.

       Pembatasan penting dalam perjanjian pinjaman                          The major covenant of this financing include
       sindikasi ini adalah:                                                 the following:

       ▪     Debt to equity ratio (DER) maksimal 3,5 kali.                  ▪    Debt to equity ratio (DER) a maximum of 3,5
                                                                                 times
       ▪     Debt service coverage ratio (DSCR) lebih dari 1,0              ▪    Debt service coverage ratio (DSCR) more
             (satu koma nol) kali selama masa operasi.                           than 1.0 (one point zero) times during
                                                                                 the operational period.
       ▪     Debt service coverage ratio (DSCR) minimal                     ▪    Debt service coverage ratio (DSCR) is at
             100% mulai tahun 2022. Jika DSCR kurang dari 1                      least 100% starting in 2022. If the DSCR is
             kali dan pemegang saham melakukan top up atau                       less than 1 time and the shareholders top up
             terdapat saldo kas akhir tahun sebelumnya                           or there is a cash balance at the end of the
             sehingga Debitur tidak mengalami keterlambatan                      previous year so that the debtor does not
             pembayaran kewajiban, maka debitur tidak                            experience delays in payment of obligations,
             dianggap melakukan pelanggaran covenant                             then the debtor is not considered to have
             DSCR.                                                               violated the DSCR covenant.
       ▪     Menjaga ekuitas selalu positif.                                ▪    Maintain positif balance of equity.

       Pada tanggal 30 Juni 2023 dan 31 Desember 2022,                       As of June 30, 2023 and December 31, 2022,
       saldo pinjaman kredit investasi PBTR dari                             the balance of PBTR investment credit loan
       PT Bank Negara Indonesia (Persero) Tbk masing-                        from PT Bank Negara Indonesia (Persero) Tbk

                                                             157
Page 161
                                                                    The original consolidated financial statements included herein are in
                                                                                                               the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                               PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                         AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                           NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                     FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                            AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                   MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                       (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)           (Expressed in full Rupiah amount, unless otherwise stated)

         masing    sebesar    Rp1.375.511.817.750         dan              amounting to Rp1,375,511,817,750                         dan
         Rp1.377.290.472.974.                                              Rp1,377,290,472,974, respectively.

         Pada tanggal 30 Juni 2023 dan 31 Desember 2022,                   As of June 30, 2023 and December 31, 2022,
         saldo pinjaman kredit IDC PBTR dari PT Bank                       the balance of PBTR IDC credit loan from
         Negara Indonesia (Persero) Tbk masing-masing                      PT Bank Negara Indonesia (Persero) Tbk
         sebesar Rp97.999.014.750 dan Rp103.353.479.894.                   amounting    to    Rp97,999,014,750   and
                                                                           Rp103,353,479,894, respectively.

    b.    Kredit Bank Sindikasi WBW                                   b. Syndication Bank Credit WBW

         Berdasarkan akta perjanjian kredit sindikasi No.53,               Based on the syndicated credit agreement deed
         tanggal 21 Desember 2018, WBW telah                               No. 53, dated December 21, 2018, WBW
         menandatangani perjanjian Kredit Sindikasi dengan                 entered    into   Loan     Syndication    with
         PT Bank Negara Indonesia (Persero) Tbk,                           PT Bank Negara Indonesia (Persero) Tbk,
         PT Bank Rakyat Indonesia (Persero) Tbk,                           PT Bank Rakyat Indonesia (Persero) Tbk,
         PT     Sarana     Multi  Infrastruktur    (Persero),              PT Sarana Multi Infrastruktur (Persero),
         PT Bank Pembangunan Daerah Jawa Timur Tbk, PT                     PT Bank Pembangunan Daerah Jawa Timur
         Bank     Pembangunan      Daerah      Riau    Kepri,              Tbk, PT Bank Pembangunan Daerah Riau
         PT Bank Pembangunan Daerah Nusa Tenggara                          Kepri, PT Bank Pembangunan Daerah Nusa
         Timur, PT Bank Pembangunan Daerah Maluku dan                      Tenggara Timur, PT Bank Pembangunan
         Maluku Utara, PT Bank Pembangunan Daerah                          Daerah Maluku and Maluku Utara, PT Bank
         Kalimantan Selatan, PT Bank Pembangunan Daerah                    Pembangunan Daerah Kalimantan Selatan,
         Sumatera     Selatan    dan    Bangka      Belitung,              PT Bank Pembangunan Daerah Sumatera
         PT Bank Pembangunan Daerah Kalimantan Barat,                      Selatan dan Bangka Belitung, PT Bank
         PT Bank Pembangunan Daerah Bengkulu,                              Pembangunan Daerah Kalimantan Barat,
         PT     Bank      Pembangunan       Daerah       Bali,             PT Bank Pembangunan Daerah Bengkulu,
         PT     Pembangunan      Daerah      Bank     Papua,               PT Bank Pembangunan Daerah Bali,
         PT Bank CIMB Niaga Tbk Unit usaha Syariah, dan                    PT Pembangunan Daerah Bank Papua,
         PT Bank Pembangunan Daerah Jawa Timur Tbk Unit                    PT Bank CIMB Niaga Tbk Business Unit
         Usaha Syariah dan Lembaga keuangan non bank                       Syariah, and PT Bank Pembangunan Daerah
         lainnya (Catatan 24)                                              Jawa Timur Tbk Business Unit Syariah
                                                                           and other non banking financial institution
                                                                           (Note 24).

         Berdasarkan akta No. 49 dan No. 50 tanggal                       Based on deed No. 49 and No. 50 dated August
         30 Agustus 2018 oleh H. Bambang Suprianto, S.H.,                 30, 2018 by H. Bambang Suprianto, S.H., SpN.,
         SpN., MH, WBW telah menandatangani perjanjian                    MH, WBW entered into Loan Agreement with
         Kredit dengan PT Bank Tabungan Negara (Persero)                  PT Bank Tabungan Negara (Persero) Tbk.
         Tbk. Bank tersebut memberikan fasilitas kredit                   These banks provided a credit Working Capital
         sebesar Rp400.000.000.000 dan maksimum sebesar                   Loan Rp400,000,000,000 and maximum credit
         Rp1.125.000.000.000 yang merupakan Kredit Modal                  facility limit of Rp1,125,000,000,000. There
         Kerja (KMK). Fasilitas tersebut diberikan untuk                  facilities are provided for the land acquisition
         pembiayaan dana talangan pengadaan tanah proyek                  bailout for the development of Krian–Legundi–
         Jalan Tol Krian–Legundi–Bunder–Manyar (KLBM).                    Bunder–Manyar (KLBM).

         Jangka waktu Kredit Modal Kerja (KMK) adalah                     A credit term loan of 24 months from dated of
         24 bulan sejak tanggal penandatangan perjanjian                  Signing of a credit agreement. The interest rate
         kredit. Suku bunga efektif per tahun adalah 8,25%                of this loan is 8.25% effective p.a –adjustable
         dan dapat disesuaikan. Berdasarkan surat dari                    rate. Based on the letter from PT Bank
         PT Bank Tabungan Negara (Persero) Tbk tanggal 28                 Tabungan Negara (Persero) Tbk dated June 28,
         Juni 2019 suku bunga kredit disesuaikan menjadi                  2019 interest rates adjusted to 8.50%.
         8,50%.

         Berdasarkan Akta No. 12 tanggal 29 Desember 2020                 Based on Deed No. 12 date December 29, 2020
         oleh notaris Gamal Wahidin, S.H., Perusahaan telah               by notary Gamal Wahidin, SH., the Company
         menandatangani      perjanjian    Kredit  dengan                 has signed a credit agreement with PT Bank
         PT Bank Tabungan Negara (Persero) Tbk. Bank                      Tabungan Negara (Persero) Tbk. The bank
         tersebut memberikan fasilitas kredit revolving                   provides a revolving credit facility of
         sebesar Rp250.000.000.000 dan maksimum sebesar                   Rp250,000,000,000     and       maximum      of
         Rp368.000.000.000 yang merupakan Kredit Modal                    Rp368,000,000,000 which is a Working Capital
         Kerja (KMK). Fasilitas tersebut diberikan untuk                  Credit (KMK). There facilities are provided for


                                                          158
Page 162
                                                                      The original consolidated financial statements included herein are in
                                                                                                                 the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

       pembiayaan dana talangan pengadaan tanah proyek                      the land acquisition bailout for the development
       Jalan Tol Krian-Legundi-Bunder-Manyar (KLBM).                        of Krian-Legundi-Bunder-Manyar (KLBM).

       Jangka waktu Kredit Modal Kerja (KMK) adalah                         Working Capital Credit (KMK) is 24 months from
       24 bulan sejak tanggal penandatangan perjanjian                      he date of signing the credit agreement.
       kredit. Suku bunga efektif per tahun adalah 8,75%                    Effective interest rate per year is 8.75% and in
       dan apabila terjadi penunggakan dikenakan denda                      the event of arrears, a fine of 2% is imposed
       2% diatas suku bunga kredit yang berlaku.                            above the prevailing credit interest rate.

       Pada tanggal 30 Juni 2023 dan 31 Desember 2022,                      As of June 30, 2023 and December 31, 2022,
       saldo pinjaman kredit investasi WBW dari                             the balance of WBW investment credit loan from
       PT Bank Negara Indonesia (Persero) Tbk adalah                        PT Bank Negara Indonesia (Persero) Tbk
       sebesar          Rp198.967.607.064          dan                      amounting      to Rp198,967,607,064        and
       Rp199.182.230.064.                                                   Rp199,182,230,064, respectively.

       Pada tanggal 30 Juni 2023 dan 31 Desember 2022,                      As of June 30, 2023 and December 31, 2022,
       saldo   pinjaman     kredit  IDC   WBW      dari                     the balance of WBW IDC credit loan from
       PT Bank Negara Indonesia (Persero) Tbk masing-                       PT Bank Negara Indonesia (Persero) Tbk
       masing adalah sebesar Rp39.068.107.944 dan                           amounting    to    Rp39,068,107,944,   and
       Rp37.999.043.855.                                                    Rp37,999,043,855, respectively.

2. PT Bank Rakyat Indonesia (Persero) Tbk                         2. PT Bank Rakyat Indonesia (Persero) Tbk

       Kredit Bank Sindikasi WBW                                            Syndication Bank Credit WBW

       WBW telah menandatangani perjanjian Kredit                           WBW obtained a syndication loan agreement
       Sindikasi dengan PT Bank Rakyat Indonesia                            with PT Bank Rakyat Indonesia (Persero) Tbk
       (Persero) Tbk dan lembaga keuangan perbankan dan                     and other banking and non banking financial
       non perbankan lainnya (Catatan 24 dan                                institutions (Note 24 and 31 Syndication
       31 Kredit Modal Kerja Sindikasi 1.c).                                Working Capital Loan 1.c).

       Pada tanggal 30 Juni 2023 dan 31 Desember 2022,                      As of June 30, 2023 and December 31, 2022,
       saldo kredit investasi WBW dari PT Bank Rakyat                       the balance of investment credit of WBW from
       Indonesia (Persero) Tbk masing-masing sebesar                        PT Bank Rakyat Indonesia (Persero) Tbk
       Rp159.131.671.543 dan Rp159.308.671.543.                             amounting     to   Rp159,131,671,543     and
                                                                            Rp159,131,671,543, respectively.

       Pada tanggal 30 Juni 2023 dan 31 Desember 2022,                      As of June 30, 2023 and December 31, 2022,
       saldo kredit IDC dari WBW dari PT Bank Rakyat                        the balance of IDC credit loan of WBW from
       Indonesia (Persero) Tbk masing-masing sebesar                        PT Bank Rakyat Indonesia (Persero) Tbk
       Rp34.168.989.302 dan Rp33.300.008.543.                               amounting    to    Rp34,168,989,302    and
                                                                            Rp33,300,008,543, respectively.

3. PT Bank BNI Syariah                                           3.
                                                                 3.      PT Bank BNI Syariah

       Kredit Bank Sindikasi PBTR                                           Syndication Bank Credit PBTR

       PBTR telah menandatangani perjanjian Kredit                          PBTR obtained a syndication loan agreement
       Sindikasi dengan PT Bank BNI Syariah dan lembaga                     with PT Bank BNI Syariah and other banking
       keuangan perbankan lainnya (Catatan 31 Kredit                        financial institutions (Note 31 Syndication
       Modal Kerja Sindikasi 1.a).                                          Working Capital Loan 1.a).

       Pada tanggal 30 Juni 2023 dan 31 Desember 2022,                      As of June 30, 2023 and December 31, 2022,
       jumlah yang terhutang kepada PT Bank BNI Syariah                     the outstanding amount from PT Bank BNI
       adalah    sebesar      Rp192.935.570.091    dan                      Syariah amounting to Rp192,935,570,091, and
       Rp192.979.274.197.                                                   Rp192,979,274,197, respectively.




                                                          159
Page 163
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

   4. PT Bank Syariah Mandiri                                       4. PT Bank Syariah Mandiri

       Kredit Bank Sindikasi WTTR                                         Syndication Bank Credit WTTR

        Berdasarkan Akta No. 3 dan 4 tanggal 5 Oktober                    Based on Deed No. 3 and 4x dated October 5,
        2018 oleh Efran Yuniarto, S.H., M.Kn., Notaris di                 2018 by Efran Yuniarto, S.H., M.Kn., Notary in
        Jakarta, WTTR dan PT Sarana Multi Infrastruktur                   Jakarta, WTTR and PT Sarana Multi
        (Persero) – Unit Usaha Syariah, PT Bank Syariah                   Infrastruktur (Persero) – Unit Usaha Syariah,
        Mandiri, PT Bank BPD Jawa Timur – Unit Usaha                      PT Bank Syariah Mandiri, PT Bank BPD Jawa
        Syariah, PT Bank Mega Syariah, PT Bank BJB                        Timur – Unit Usaha Syariah, PT Bank Mega
        Syariah menandatangani Perjanjian Kredit dengan                   Syariah, PT Bank BJB Syariah entered into
        fasilitas    kredit     maksimum         sebesar                  Loan Agreement providing loan facilities with
        Rp1.293.201.000.000. Fasilitas tersebut diberikan                 ceiling of Rp1,293,201,000,000. Loan facilities
        untuk keperluan pembangunan Jalan Tol Ruas                        are provided for development of Pasuruan -
        Pasuruan - Probolinggo.                                           Probolinggo Toll Road.
        Pinjaman ini dikenakan bunga sebesar 11% per                      This loan bears interest at 11% per annum for
        tahun untuk Tranche A1.                                           Tranche A1.
        Pinjaman tersebut di atas dijamin dengan seluruh                  The above loans are collateralized by all of toll
        hak konsesi pengusahaan jalan tol, seluruh tagihan                road concessions rights, all invoices and
        dan pendapatan operasional dari pengelolaan jalan                 operating revenues from toll road management
        tol dan usaha-usaha lain terkait dengan pengelolaan               and other business ventures related to toll road
        jalan tol, escrow account, tagihan atas pendapatan                management, escrow accounts, claims for
        dari hasil klaim asuransi, klaim bank garansi,                    income from insurance claims, bank guarantee
        penggantian dana dari pemerintah, gadai saham                     claims and reimbursement of funds from the
        milik pemegang saham, serta company gurantee dari                 government, the shareholders’ pledge of
        para pemegang saham. Perjanjian pinjaman juga                     shares, and the company gurantee of the
        mencakup persyaratan tertentu antara lain:                        shareholders. The loan agreement also covers
                                                                          certain requirements such as:

        •    Membatasi hak Perusahaan untuk memperoleh                    •     Limiting the Company's right to obtain new
             kredit/ fasilitas baru, mengubah susunan                           credits/ facilities, changing shareholder
             pemegang saham, melakukan perubahan PPJT                           struture, making changes to the PPJT and
             dan atau business plan, serta mengharuskan                         or business plan and requires WTTR to
             WTTR untuk mempertahankan rasio keuangan                           maintain certain financial ratios calculated
             tertentu yang dihitung berdasarkan laporan                         based on WTTR financial statement.
             keuangan WTTR.

        •    Pembatasan penting dalam perjanjian pinjaman                 •     The major covenant of this financing
             ini adalah:                                                        include the following:

             a. Debt to equity ratio (DER) mencerminkan                         a. Debt to equity ratio (DER) reflecting the
                rasio pembiayaan bank dan self financing                           ratio of bank financing and self
                dengan komposisi 60:40. Dan Perusahaan                             financing with the composition of 60:40.
                harus menjaga seluruh posisi DER tidak                             And the Company must maintain all
                lebih besar dari 500%, jika DER lebih besar                        DER position not greater than 500%, if
                dari 500% maka Perusahaan harus                                    DER      is   greater    than     500%,
                melakukan penambahan modal atau                                    the     Company        must     increase
                pengurangan/ pembayaran hutang.                                    the additional capital paid up or
                                                                                   reduce/repay the debt.
             b. Debt service coverage ratio (DSCR) lebih                        b. Debt service coverage ratio (DSCR)
                dari 1,0 (satu koma nol) kali selama masa                          above 1.0 (one point zero) times during
                operasi.                                                           the operation period.
             c. Menjaga ekuitas selalu positif.                                 c. Maintain positif balance of equity.
             d. Rasio modal disetor terhadap total utang di                     d. The ratio of paid up capital to the total
                bank minimal sebesar 10%.                                          debt in the bank is minimum 10%.

        Pada tanggal 30 Juni 2023 dan 31 Desember 2021,                   As of June 30, 2023 and December 31, 2022,
        saldo pinjaman kredit investasi WTTR ke PT Bank                   the balance of WTTR investment credit loan
        Mandiri    Syariah      masing-masing    sebesar                  from PT Bank Mandiri Syariah amounting to
        Rp749.123.100.049 dan Rp750.746.200.100.                          Rp749,123,100,049 and Rp750,746,200,100,
                                                                          respectively.

                                                          160
Page 164
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

   Entitas Anak – WKR                                              Subsidiary – WKR

   PT Bank Tabungan Negara (Persero) Tbk.                          PT Bank Tabungan Negara (Persero) Tbk.

   KMK Bridging Loan                                               KMK Bridging Loan
   Pada tanggal 22 Februari 2021, WKR menandatangani               On February 22, 2021, WKR obtained contract
   kontrak perjanjian No. 17 dengan PT Bank Tabungan               agreement No.17 with PT Bank Tabungan Negara
   Negara (Persero) Tbk terkait dengan fasilitas pinjaman          (Persero) Tbk related to loan facility amounting to
   sebesar Rp275.000.000.000. Fasilitas pinjaman ini               Rp275,000,000,000. This loan facility is Bridging
   merupakah fasilitas Bridging Loan untuk pembayaran              Loan Facility for will be used specifically for debt
   hutang. Pada Februari 2022, Perusahaan memperoleh               refinancing. On February 2022, the Company
   persetujuan perpanjangan periode fasilitas menjadi 36           obtained        approval     for      extension      of
   bulan dengan jatuh tempo 22 Februari 2025.                      the facility periods are 36 months with a maturity date
                                                                   till February 22, 2025.

   Perjanjian ini telah addendum tanggal 29 Desember               This aggrement has amandment on December 29,
   2022 pada perjanjian kredit No. 114, memperoleh                 2022 based on contract aggrement No. 114,
   persetujuan perpanjangan periode fasilitas menjadi 36           the Company obtained approval for extension of
   bulan dengan jatuh tempo 22 Februari 2025 dengan                the facility periods are 36 months with a maturity date
   tingkat suku bunga 9,50% per tahun.                             till February 22, 2025 with interest rate of 9.50%
                                                                   per annum.

   KMK Kemitraan                                                   KMK Kemitraan
   Pada tanggal 22 Februari 2020, WKR menandatangani               On February 22, 2020, WKR entered contract
   kontrak perjanjian No. 5 dengan PT Bank Tabungan                agreement No. 5 with PT Bank Tabungan Negara
   Negara (Persero) Tbk terkait dengan fasilitas pinjaman          (Persero) Tbk related to loan facility amounting to
   sebesar Rp100.000.000.000. Fasilitas pinjaman ini               Rp100,000,000,000. This loan facility for will be used
   hanya dapat digunakan untuk pembiayaan modal kerja              specifically for working capital with term of 36 months
   dengan jangka waktu fasilitas pinjaman adalah 36 bulan          after signing contract with interest rate of 9.50% per
   setelah penandatanganan kontrak perjanjian dengan               annum.
   tingkat suku bunga 9,50% per tahun.

   KMK Nines                                                       KMK Nines
   Pada tanggal 14 Agustus 2020, WKR menandatangani                On August 14, 2020, WKR entered contract
   kontrak perjanjian No. 1 dengan PT Bank Tabungan                agreement No. 1 with PT Bank Tabungan Negara
   Negara (Persero) Tbk terkait dengan fasilitas pinjaman          (Persero) Tbk related to loan facility amounting to
   sebesar Rp400.000.000.000. Fasilitas pinjaman ini               Rp400,000,000,000. This loan facility will be used
   hanya dapat digunakan untuk pembiayaan konstruksi               specifically for the construction of unit of apartment in
   pembangunan unit apartemen di proyek Vasaka Nines,              Vasaka Nines Project, in BSD-Banten. with term of 60
   di BSD-Banten dengan jangka waktu fasilitas pinjaman            months after signing contract with interest rate of
   adalah 60 bulan setelah penandatanganan kontrak                 9.90% per annum. The credit facilities are secured by
   perjanjian dengan tingkat suku bunga 9,90% per tahun.           land square of 8.922 m2 located on project
   Pinjaman tersebut dijamin dengan tanah seluas 8.922             development of Vasaka Nines BSD and cessie of unit
   m2 di lokasi proyek pembangunan Vasaka Nines BSD                apartment from customers.
   dan agunan pokok kredit unit apartemen dengan
   asuransi kerugian.

   KMK 88 Avenue                                                   KMK 88 Avenue
   Pada tanggal 29 Mei 2017, WKR menandatangani                    On May 29, 2017, WKR entered contract agreement
   kontrak perjanjian No. 53 dengan PT Bank Tabungan               No. 53 with PT Bank Tabungan Negara (Persero) Tbk
   Negara (Persero) Tbk terkait dengan fasilitas pinjaman          related     to   loan     facility  amounting       to
   sebesar Rp300.000.000.000. Fasilitas pinjaman ini               Rp300,000,000,000. This loan facility will be used
   hanya dapat digunakan untuk pembiayaan konstruksi               specifically for the construction of hardcost
   hardcost pembangunan SOHO dan Apartemen 88                      development of SOHO and Apartment 88 Avenue,
   Avenue, proyek KSO Waskita – Darmo, di Surabaya                 owned by KSO Waskita – Darmo, in Surabaya with
   dengan jangka waktu fasilitas pinjaman adalah 60 bulan          term of 60 months after signing contract with interest
   setelah penandatanganan kontrak perjanjian dengan               rate of 9.75% per annum. The credit facilities are
   tingkat suku bunga 9,75% per tahun. Pinjaman tersebut           secured by land and building owned by KSO Waskita
   dijamin dengan tanah dan bangunan yang ada diatasnya            – Darmo.
   milik KSO Waskita – Darmo.


                                                          161
Page 165
                                                                     The original consolidated financial statements included herein are in
                                                                                                                the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                          AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                      FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                             AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                    MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                        (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)            (Expressed in full Rupiah amount, unless otherwise stated)

   Perjanjian ini telah addendum tanggal 27 April 2022 pada          This aggrement has amandment on April 27 2022
   perjanjian kredit No.15, WKR memperpanjang fasilitas              based on contract aggrement No.15, WKR extended
   dengan jangka waktu 24 bulan dengan fasilitas pinjaman            the facility with obtained approval for extension of the
   sebesar Rp190.000.000.000.                                        facility periods are 24 months with oustanding plafond
                                                                     amounting Rp190,0000,000,000.

   KMK Reiz Condo                                                    KMK Reiz Condo
   Pada tanggal 18 Desember 2017, WKR menandatangani                 On December 18, 2017, WKR entered contract
   kontrak perjanjian No. 28 dengan PT Bank Tabungan                 agreement No. 28 with PT Bank Tabungan Negara
   Negara (Persero) Tbk terkait dengan fasilitas pinjaman            (Persero) Tbk related to loan facility amounting to
   sebesar Rp340.000.000.000. Fasilitas pinjaman ini                 Rp340,000,000,000. This loan facility will be used
   hanya dapat digunakan untuk pembiayaan konstruksi                 specifically for the construction of 610 units of
   pembangunan 610 unit apartemen di proyek The Reiz                 apartment in The Reiz Condo Project owned
   Condo PT Waskita Karya Realty, di Medan.                          PT Waskita Karya Realty, in Medan.

   Saldo pokok terutang dari fasilitas ini sebesar                   The outstanding principal balance amounting to
   Rp340.000.000.000 dengan jangka waktu penarikan                   Rp340,000,000,000 with term of withdrawal 60
   fasilitas pinjaman      adalah   60   bulan    setelah            months after signing contract with interest rate of 9.25
   penandatanganan kontrak perjanjian dengan tingkat                 % per annum. The credit facilities are secured by land
   suku bunga 9,25 % per tahun. Pinjaman tersebut dijamin            square of 7,856 m2 located on project development of
   dengan tanah seluas 7.856 m2 di lokasi proyek                     The Reiz Condo Medan and cessie of unit apartment
   pembangunan The Reiz Condo Medan dan agunan                       from customers.
   pokok kredit unit apartemen dengan asuransi kerugian.

   Perjanjian ini telah addendum tanggal 29 Desember                 This aggrement has amandment on December 29,
   2022 pada perjanjian kredit No. 114, Perusahaan                   2022 based on contract aggrement No. 114, The
   memperpanjang fasilitas dengan jangka waktu.                      Company extended the facility with obtained approval
                                                                     for extension of the facility periods.

   WFPR                                                              WFPR
   Pada tanggal 15 Januari 2020, WFPR menandatangani                 On January 15, 2020, WFPR entered contract
   kontrak perjanjian No. 41 dengan PT Bank Tabungan                 agreement No. 41 with PT Bank Tabungan Negara
   Negara (Persero) Tbk terkait dengan fasilitas pinjaman            (Persero) Tbk related to loan facility amounting to
   sebesar Rp258.000.000.000. Fasilitas pinjaman ini                 Rp258,000,000,000. This loan facility will be used
   hanya dapat digunakan untuk pembiayaan konstruksi                 specifically for the construction of unit of apartment in
   pembangunan unit apartemen di proyek Vasaka Solterra              Vasaka Solterra Project owned PT Waskita Fim
   PT Waskita Fim Perkasa Realti, di Pejaten Jakarta                 Perkasa Realti, in Pejaten Jakarta with term of 60
   dengan jangka waktu fasilitas pinjaman adalah 60 bulan            months after signing contract with interest rate of
   setelah penandatanganan kontrak perjanjian dengan                 9.50% per annum..
   tingkat suku bunga 9,50% per tahun.

   Perjanjian ini telah melakukan addendum tanggal 11 Mei            This aggrement has amandment on May 11, 2023
   2023 pada perjanjian kredit No. 60, Perusahaan                    based on contract aggrement No. 60, The Company
   memperpanjang fasilitas dengan jangka waktu menjadi               extended the facility with obtained approval for
   tanggal 15 Januari 2027.                                          extension of the facility to January 15, 2027.

   Pinjaman tersebut dijamin dengan tanah seluas 11.233              The credit facilities are secured by land square of
   m2 di lokasi proyek pembangunan Vasaka Solterra                   11,233 m2 located on project development of Vasaka
   Pejaten dan agunan pokok kredit unit apartemen dengan             Solterra Pejaten and cessie of unit apartment from
   asuransi kerugian.                                                customers.

   Fasilitas ini   mensyaratkan     Perusahaan            untuk      These facilities require the Company to maintain
   memelihara rasio keuangan tertentu:                               financial ratio.

   a. Current ratio > 1x                                             a.     Current ratio at > 1x
   b. Debt to equity ratio < 5x                                      b.     Debt to equity ratio < 5x
   c. Rasio modal disetor terhadap total utang di bank min           c.     Ratio from paid fully paid capital to total bank
      10%                                                                   loan min 10%
   d. EBITDA bernilai positif                                        d.     EBITDA has positive



                                                            162
Page 166
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

   Pada tanggal 30 Juni 2023 dan 31 Desember 2022, saldo           As of June 30, 2023 and December 31, 2022,
   pinjaman jangka panjang WKR dari PT Bank Tabungan               the balance of long-term loan of WKR from PT Bank
   Negara (Persero) Tbk masing-masing sebesar                      Tabungan Negara (Persero) Tbk amounting to
   Rp1.096.714.067.782 dan Rp1.114.270.315.745.                    Rp1,096,968,067,782 and Rp1,114,270,315,745,
                                                                   respectively.

   Pada tanggal 30 Juni 2023 dan 31 Desember 2022,                 As of June 30, 2023 and December 31, 2022, WKR
   terdapat saldo pinjaman WKR yang jatuh tempo dalam              current portion of long-terms loan balance from
   setahun dari PT Bank Tabungan Negara (Persero) Tbk              PT Bank Tabungan Negara (Persero) Tbk amounting
   sebesar Rp286.818.750.000 dan Rp163.125.000.000.                to Rp286.818.750.000 and Rp163,125,000,000.

   Entitas Anak – WBP                                              Subsidiary – WBP

  1.   PT Bank Rakyat Indonesia (Persero) Tbk.                      1.   PT Bank Rakyat Indonesia (Persero) Tbk.

       Berdasarkan Surat dari Bank BRI No. R.IV.45-                      Based on the Letter from Bank BRI
       CRO/BCO/08/2021 tanggal 20 Agustus 2021                           No. R.IV.45-CRO/BCO/08/2021 dated August
       mengenai penawaran putusan kredit, telah disetujui                20, 2021 regarding credit decision offer,
       fasilitas Modal Kerja Konstruksi (KMKK) dengan                    the Construction Working Capital Facility has
       plafond sebesar Rp1.000.000.000.000 dan fasilitas                 been     approved     with  a    ceiling     of
       SCF       sebesar   Rp250.000.000.000      bersifat               Rp1,000,000,000,000 with KMKK facitlity and
       interchangeable dengan fasilitas KMKK, dengan suku                the SCF facility of Rp250,000,000,000 is
       bunga 9,00% p.a. dan jangka waktu 30 Agustus 2021                 interchangeable with the KMKK facility, with an
       sampai dengan 30 November 2021.                                   interest rate of 9% p.a. and the period from
                                                                         August 30, 2021 to November 30, 2021.

       Fasilitas pinjaman ini dijamin dengan piutang usaha               This loan facility is secured by trade receivables
       yang diikatkan secara cessie minimal meng-cover                   tied in cessie at least to cover 120% of
       sebesar 120% dari outstanding pinjaman dan agunan                 outstanding loans and collateral according to
       sesuai SHT 209/2017 di Desa Gasing Kecamatan                      SHT 209/2017 in Gasing Village, Talang Kelapa
       Talang Kelapa, Kabupaten Banyuasin, Provinsi                      District, Banyuasin Regency, South Sumatra
       Sumatera Selatan senilai Rp41.651.000.000.                        Province amounting to Rp41,651,000,000. As
       Sebagai tambahan informasi, WBP telah menerima                    additional information, WBP has received a
       surat Review Pengikatan Agunan Fasilitas Pinjaman                 Letter of Review on the Bonding of Loan Facility
       dari Bank BRI nomor: B.13a-ITG/CON/01/2022                        Collateral from Bank BRI number: B.13a-
       tanggal 12 Januari 2022 sehubungan dengan                         ITG/CON/01/2022 dated January 12, 2022 in
       pengikatan jaminan aset Perusahaan.                               connection with the binding of collateral for the
                                                                         Company's assets.

       Adapun perubahan atas negative covenants yang                     The changes to the negative covenants that are
       diatur adalah tanpa terlebih dahulu memperoleh                    regulated are that without first obtaining written
       persetujuan tertulis dari BRI, debitur tidak                      approval from BRI, debtors are not allowed,
       diperkenankan antara lain tetapi tidak terbatas pada              among others, but not limited to receiving new
       menerima pinjaman/ pembiayaan baru dari Bank atau                 loans/financing from Banks or Other Financial
       Lembaga Keuangan Lainnya yang menyebabkan                         Institutions which causes the Company's DER
       rasio DER Perusahaan melebihi 300%.                               ratio to exceed 300%.

       Pembatasan terhadap tindakan:                                     Restriction of covenant:

       1.   Mengikatkan diri sebagai penjamin terhadap                    1.    Binds itself as a collateral against
            pihak lain dan/atau menjaminkan kekayaan                            the other party and/or pledging Debtor
            debitur kepada pihak lain, kecuali yang sudah                       wealth to other parties, except those
            ada saat ini.                                                       already existing.
       2.   Mengajukan permohonan pernyataan pailit                       2.    Filing for bankruptcy declaration to
            kepada Pengadilan Niaga untuk menyatakan                            the Commercial Court to declare itself
            pailit debitur sendiri.                                             insolvent debtor.
       3.   Menyewakan aset yang dijaminkan di bank atau                  3.    Lease the tangible assets in banks or other
            lembaga keuangan lainnya.                                           financial institutions.
       4.   Melunasi/membayar utang kepada pemegang                       4.    Repay the debt to shareholders/limited
            saham/utang persero sebelum utang di bank                           company's debt before the bank repays the
            dilunasi terlebih dahulu.                                           debt in advance.

                                                          163
Page 167
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

       5.   Melakukan tindakan merger, akuisisi, go public                5.    Perform mergers, acquisitions, go public
            dan penjualan aset Perusahaan. Menerima                             and sell the Company’s assets;
            pinjaman/pembayaran baru dari BRI atau
            lembaga keuangan lainnya.

       Berdasarkan Perjanjian Perdamaian dalam PKPU                      Based on the Reconciliation Agreement in
       fasilitas pinjaman ini direstrukturisasi menjadi Utang            PKPU this loan facility was restructured into
       Bank Jangka Panjang. Pada tanggal 30 Juni 2023                    Long-Term Bank Loans. As of June 30, 2023
       dan 31 Desember 2022, saldo pinjaman jangka                       and December 31, 2022, the balance of long-
       Panjang WBP kepada PT Bank Rakyat Indonesia                       term loan of WBP to PT Bank Rakyat Indonesia
       (Persero)       Tbk       masing-masing       sebesar             (Persero) Tbk amounting to Rp311,006,819,095
       Rp311.006.819.095 dan Rp307.953.591.213.                          and Rp307,953,591,213, respectively.

       Pinjaman BRI akan jatuh tempo pada tahun ke 17                    BRI loans will be due on the 17th year from
       sejak Tanggal Efektif.                                            Effective Date

  2.   PT Bank Syariah Indonesia (d/h PT Bank Mandiri              2.    PT Bank Syariah Indonesia (formerly
       Syariah,  PT     Bank    BNI    Syariah   dan                     PT Bank Mandiri Syariah, PT Bank BNI
       PT Bank BRI Syariah)                                              Syariah and PT Bank BRI Syariah)

       Berdasarkan perjanjian pemberian line facility                    Based       Musyarakah         facility   agreement
       Musyarakah No. 13 tanggal 17 Oktober 2016 dan                     No. 13 dated October 17, 2016, and this
       fasilitas ini telah diperpanjang berdasarkan surat No.            facility has recently been extended based
       B.04/SP3/FSD/01-2021 tanggal 27 Januari 2021,                     on the letter No. B.04/SP3/FSD/01-2021 dated
       dengan kondisi dan persyaratan sebagai berikut Line               January 27, 2021, with the following conditions
       Facility         Musyarakah        dengan       plafon            Line Facility Musyarakah with ceiling of
       Rp470.000.000.000, jatuh tempo fasilitas sampai                   Rp470,000,000,000, facility maturity date up to
       dengan 27 Februari 2022, nisbah bagi hasil akan                   February 27, 2022, the profit sharing ratio will be
       ditentukan kemudian saat pencairan dengan indikasi                determined later when disbursing with an
       expense yield Bank saat ini sebesar 8% efektif per                indication that the current bank yield is 8%
       tahun. Sampai dengan tanggal pelaporan, pinjaman                  effective per year. As of the date of reporting,
       ini masih dalam proses perpanjangan.                              this loan is still in the process of being extended.

       Selama masa pembiayaan di PT Bank Syariah                         During the financing period at PT Bank BRI
       Indonesia Tbk (BSI) berlangsung maka WBP tidak                    syariah Tbk (BRIS), WBP are not permitted to
       diperkenankan melakukan tindakan-tindakan di                      carry out the following actions without written
       bawah ini tanpa persetujuan tertulis dari BSI:                    consent from BRIS:

       a.   Mengadakan merger dengan Perusahaan lain;                     a.    Hold a merger with another company;
       b.   Membayar/melunasi sebagian atau seluruh                       b.    Pay/pay off part or all of the loan
            pinjaman dari pemegang saham;                                       from the shareholders;
       c.   Mengubah bentuk atau status badan hukum                       c.    Change the form or status of the legal
            Perseroan,      merubah     anggaran     dasar                      entity of the Company, amending
            Perusahaan, memindahtangankan penerima                              the Company's articles of association,
            atau saham baik antar pemegang saham                                transferring recipients or shares both
            maupun pihak lain;                                                  among shareholders and other parties;
       d.   Mengagunkan, menyewakan dan mengalihkan                       d.    Appoint, lease and transfer assets
            aset yang dijaminkan kepada kreditur atau pihak                     guaranteed to creditors or other parties;
            lainnya;
       e.   Melakukan investasi baru pada bidang usaha                    e.    Make new investments in business fields
            yang tidak secara langsung berkaitan dengan                         that are not directly related to
            bisnis inti nasabah;                                                the customer's core business;
       f.   Menjual      sebagian   atau   seluruh     aset               f.    Sells part or all of the Company's assets,
            Perusahaan, di luar kegiatan operasional                            excluding the Company's operational
            Perusahaan;                                                         activities.
       g.   Mengajukan pailit atau penundaan pembayaran;                  g.    File a bankruptcy or delay in payment;
       h.   Menarik kembali modal yang telah disetor oleh                 h.    Withdrawing capital paid by shareholders;
            para pemegang saham;
       i.   Merubah       pemegang     saham     mayoritas                i.    Change the majority               shareholder        of
            Perseroan.                                                          the Company.


                                                          164
Page 168
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

       Fasilitas ini dijaminkan dengan:                                  This loan facility are secured with:
        1. Jumlah tagihan (seluruh hak, wewenang,                        1. The amount of the bill (all rights, powers,
             tagihan serta klaim-klaim) yang dimiliki                          bills and claims) that the Company has to
             Perusahaan kepada bouwheer atas kontrak-                          the bouwheer for the work contracts
             kontrak pekerjaan yang menjadi underlying                         underlying the disbursement in BSI.
             pencairan di BSI.
        2. Persediaan berupa barang jadi (Beton Precast)                  2.    Inventories in the form of finished goods
             dan/atau bahan material berupa pasir, batu,                        (Precast Concrete) and/or material
             semen, besi/baja, dan lain-lain.                                   materials in the form of sand, stone,
                                                                                cement, iron/steel, and others.

       Nilai fidusia atas jaminan berupa tagihan dan                      Fiduciary value with                collateralized        bill
       persediaan adalah senilai Rp750.000.000.000.                       and     inventory  are                amounting            to
                                                                          Rp750,000,000,000.

       WBP diwajibkan untuk menjaga Debt service                         WBP should maintain Debt service coverage
       coverage ratio (EBITDA dibandingkan total                         ratio (EBITDA compared to the Bank's total
       kewajiban Bank) minimal 1,1 kali dan Leverage                     liabilities) at least 1.1 times and maximum
       maksimal 5 kali.                                                  leverage of 5 times.

       Berdasarkan Surat dari BSI nomor 03/026-3/CMG                     Based on the Letter from BSI number 03/026-
       tanggal 24 Maret 2023 perihal Surat penyampaian                   3/CMG dated March 24, 2023 regarding the
       tagihan kewajiban PT Waskita Beton Precast Tbk                    Letter of submission of PT Waskita Beton
       (WSBP) ke PT Bank Syariah Indonesia Tbk (BSI)                     Precast Tbk (WSBP) liability bills to PT Bank
       atas fasilitas supplier financing yang masuk dalam                Syariah Indonesia Tbk (BSI) for supplier
       kategori kreditur kongkuren sesuai Putusan                        financing facilities that fall into the category of
       Homologasi No. 497/Pdt.SusPKPU/2021/PN.Niaga.                     congruent creditors according to the Decision
       Jkt.Pst, dengan ini disampaikan hal-hal berikut:                  Homologation No. 497/Pdt.SusPKPU/2021/
                                                                         PN.Niaga.Jkt.Pst, we hereby submit the
                                                                         following:

       1.   Total tagihan kepada BSI sebagai Kreditur                     1.    Total claims to BSI as Concurrent Creditors
            Konkuren (Fasilitas SCF) adalah sebesar                             (SCF         Facility)    amounted         to
            Rp187.665.894.478.                                                  Rp187,665,894,478.
       2.   Tunggakan Kewajiban sebelum Putusan                           2.    Arrears of Liability prior to Homologation
            Homologasi sebesar Rp9.984.667.552                                  Decision of Rp9,984,667,552
       3.   Pembayaran kewajiban PT Waskita Beton                         3.    Payment of obligations of PT Waskita
            Precast Tbk ke PT Bank Syariah Indonesia atas                       Beton Precast Tbk to PT Bank Syariah
            fasilitas Supplier Financing kami tagihkan                          Indonesia for the Supplier Financing facility
            sebesar Rp284.119.681.211 (sesuai skedul                            of Rp284,119,681,211 (according to the
            yang tertera pada surat).                                           schedule stated in the letter).
       4.   Atas pembayaran tagihan ujrah pada bulan                      4.    For payment of ujrah bills in March 2023 in
            Maret 2023 sebesar Rp1.913.420.518 agar                             the amount of Rp1,913,420,518 to be
            dicadangkan oleh PT Waskita Beton Precast ke                        reserved by PT Waskita Beton Precast to
            rekening escrow BSI 7231185636 a.n.                                 the BSI escrow account 7231185636 a.n.
            PT Waskita Beton Precast.                                           PT Waskita Beton Precast.
       5.   Pendebetan atas ujrah tersebut akan dilakukan                 5.    The debit for the ujrah will be carried out
            setelah proses novasi atas fasilitas SCF di BSI                     afterthe novation process for the SCF
            terselesaikan.                                                      facility at BSI iscompleted.

       Berdasarkan Perjanjian Perdamaian dalam PKPU                      Based on the Reconciliation Agreement in
       fasilitas pinjaman ini direstrukturisasi menjadi Utang            PKPU this loan facility was restructured into
       Bank Jangka Panjang. Pada tanggal 30 Juni 2023                    Long-Term Bank Loans. As of June 30, 2023
       dan 31 Desember 2022 saldo pinjaman jangka                        and December 31, 2022, the balance of long-
       panjang WBP sebesarr Rp251.726.795.570 and                        term loan of WBP to PT Bank BRIsyariah
       Rp178.930.675.660.                                                amounting   to    Rp251,726,795,570      and
                                                                         Rp178,930,675,660, respectively.

       Pinjaman BSI akan jatuh tempo pada tahun ke 17                    BSI loans will be due on the 17th year from
       sejak Tanggal Efektif.                                            Effective Date


                                                          165
Page 169
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

  3.   PT Bank Negara Indonesia (Persero) Tbk                    . 3.    PT Bank Negara Indonesia (Persero) Tbk

       Berdasarkan surat No. KPS3/4.1/140/R tanggal                      According to letter No. KPS3/4.1/058/R dated
       23 Juni 2022, Perusahaan memperoleh fasilitas                     June    23,   2022,      WBP     entered into
       kredit dari PT Bank Negara Indonesia (Persero) Tbk                the credit facilities from PT Bank Negara
       sebagai berikut:                                                  Indonesia (Persero) Tbk as follows:

       •   Kredit modal kerja Revolving Rp50.000.000.000,                •     Revolving      working capital         loan of
           jangka waktu pinjaman diperpanjang sementara                        Rp50,000,000,000,          the      term    of
           sampai dengan tanggal 26 September 2022                             the loan is temporarily extended until
           dengan perubahan suku bunga efektif sebesar                         September 26, 2022 with change in
           8,00% p.a.                                                          the effective interest rate to 8.00% p.a..
       •   Kredit modal transaksional Rp300.000.000.000,                 •     Transactional        capital       loan     of
           jangka waktu pinjaman diperpanjang sementara                        Rp300,000,000,000,          the      term   of
           sampai dengan tanggal 26 September 2022                             the loan is temporarily extended until
           dengan perubahan suku bunga efektif sebesar                         September 26, 2022 with change in
           8,00% p.a                                                           the effective interest rate to 8.00% p.a.

       •   Kredit modal kerja post financing sebesar                     •     Post-financing      working      capital  loan
           Rp214.949.532.620, jangka waktu pinjaman                            amounting to Rp214,949.532,620, the term
           diperpanjang sementara sampai dengan tanggal                        of the loan is temporarily extended until
           31 Desember 2022 dengan perubahan suku                              December 31, 2022 with a change in
           bunga efektif sebesar 8,00% p.a.                                    the effective interest rate to 8.00% p.a.

           Fasilitas pinjaman ini dijamin dan diikat dengan:                   The loan facilities are collateralized and
                                                                               bounded with:

           •   Tagihan term-in atas proyek yang dibiayai                        •    Term-in bills on financed projects
           •   Tanah dan Bangunan yang terletak di                              •    Land and Buildings located on
               Jl. Raya Sadang – Subang No.28 KM 15,                                 Jl. Raya Sadang – Subang No.28 KM
               Kampung Mekarsari, RT 05 RW 02, Desa                                  15, Mekarsari Village, RT 05 RW 02,
               Cibatu, Kecamatan Cibatu, Kabupaten                                   Cibatu    Village,    Cibatu    District,
               Purwakarta, Jawa Barat sesuai SHT                                     Purwakarta Regency, West Java
               No.2342/2015 dan SHT No.02440/2021                                    according to SHT No.2342/2015 and
               sebesar Rp168.487.004.000.                                            SHT No.02440/2021 amounting to
                                                                                     Rp168,487,004,000.
           •   Tanah dan Bangunan yang terletak di Jl.                          •    Land and Buildings located at
               Imam Bonjol No.52, Desa Kalijaya, Kec.                                Jl. Imam Bonjol No. 52, Kalijaya
               Cikarang Barat, (dhi. Cibitung), Kab. Bekasi,                         Village, West Cikarang District,
               Jawa Barat sesuai SHT. 03410/2016 sebesar                             (formerly Cibitung), Bekasi Regency,
               Rp58.218.498.201.                                                     West Java according to SHT.
                                                                                     03410/2016 of Rp58,218,498,201.

       Sebagai tambahan informasi, WBP telah menerima                    As additional information, WBP has received a
       Surat       Keputusan         Kredit       (SKK)                  letter from BNI No. KPS3/2.2/204 dated
       No. KPS3/2.2/204 tanggal 19 Mei 2021 sehubungan                   May 19, 2021 regarding the binding of
       dengan pengikatan jaminan aset Perusahaan.                        the Company's asset collateral.

       Pembatasan terhadap tindakan:                                     Restriction of covenant:

       1. Melakukan         perubahan kegiatan usaha                      1.    Change the business activities as stated in
          sebagaimana tercantum dalam anggaran dasar                            the Articles of Association that can reduce
          yang dapat mengurangi kemampuan melunasi                              the Company’s ability to pay off the credit
          fasilitas kredit.                                                     facility.

       2. Menjual     atau   memindahkan     hak   atau                  2. Sell or transfer all of the assets of
          mengalihkan seluruh atau sebagian kekayaan/                       the Company in a single transaction or in
          aset dalam satu transaksi atau dalam beberapa                     multiple transactions, except:
          transaksi kecuali:



                                                          166
Page 170
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

           •   Menjual atau mengalihkan aset dengan                           •   Selling or transferring assets under
               ketentuan yang bersifat arm’s length dan                           arragement that are at arm’s length and
               dalam rangka menjalankan usaha sehari-hari.                        in order to run the daily business
                                                                                  activities
           •   Menjual atau dengan cara lain mengalihkan                      •   Selling or transferring assets as a
               aset sebagai ganti atau digantikan aset                            replacement or to be replaced with
               lainnya yang sebanding atau lebih baik tipe,                       another comparable assets or better in
               sifat dan kualitasnya.                                             type, nature, and quality
           •   Menjual atau mengalihkan aset dalam rangka                     •   Selling or transferring assets for
               pelaksanaan reorgarnisasi oleh Pemerintah                          the       purpose      of     Government
               Republik Indonesia sepanjang penjualan aset                        reorganization of Republic of Indonesia
               tersebut tidak mempunyai akibat material dan                       as long as the sale of assets did not have
                                                                                  a material result; and.
           •   Menjual atau mengalihkan aset yang sudah                       •   Selling or transferring assets that are not
               tidak berguna atau tidak dipakai lagi dengan                       useful or not used with the requirements
               ketentuan yang bersifat arm’s length.                              of arm’s length

       3. Mengubah usaha yang sekarang dijalankan/                       3. Change the operation of current business
          diusahakan yang dapat menimbulkan akibat                          that may cause material impact unless
          material, kecuali dipersyaratkan oleh perundang-                  required by applicable law.
          undangan yang berlaku.

       4. Melakukan         peleburan,      penggabungan,                4. Merger, business combination, separation,
          pemisahan, pembubaran Perseroan maupun                            liquidation or corporate reorganization
          rekonstruksi (tindakan korporasi), kecuali:                       (corporate action), except:

           •   Reorganisasi yang dapat dilakukan oleh                         •   Reorganization can be done by
               Pemerintah Republik Indonesia sepanjang                            the Government of Republic Indonesia as
               tidak memiliki akibat material.                                    long as the impact is not material
           •   Tindakan korporasi dengan anggota lain                    •    •   The corporate actions with other
               dalam grup dengan ketentuan bahwa                                  members in The Company with
               tindakan korporasi tersebut dilakukan.                             the provision following the requirements
           •   Tindakan korporasi yang dipersyaratkan oleh               •    •   The Company will be the resurviving
               peraturan      perundang-undangan      yang                        legal entity and will have the legal status
               berlaku.                                                           after the corporate action; and.
           •   Pemisahan dimana Perusahaan menjadi                       •    •   Separation in which the Company will be
               pemegang saham mayoritas.                                          the majority shareholder.

       5. Melakukan perubahan anggaran dasar yang                        5. Changes in the Articles of Association that
          dapat menimbulkan akibat material.                                can lead to a material impact; and.

       6. Mengajukan permohonan pailit atau permohonan                   6. Propose to file bankruptcy or postponement
          penundaan kewajiban pembayaran utang kepada                       of debt payment to authorized parties
          instansi yang berwenang.

       7. Memperoleh pinjaman dari bank atau lembaga                     7. Obtain or add a loan from a bank or other
          keuangan lain.                                                    financial institution.

       Berdasarkan Perjanjian Perdamaian dalam PKPU                       Based on the Reconciliation Agreement in
       fasilitas pinjaman ini direstrukturisasi menjadi Utang             PKPU this loan facility was restructured into
       Bank Jangka Panjang. Pada tanggal 30 Juni 2023                     Long-Term Bank Loans. As of June 30, 2023
       dan 31 Desember 2022, saldo pinjaman jangka                        and December 31, 2022, the balance of long-
       panjang WBP kepada PT Bank Negara Indonesia                        term loan of WBP to PT Bank Negara Indonesia
       (Persero)       Tbk       masing-masing       sebesar              (Persero)      Tbk        amounting        to
       Rp193.208.630.440 dan Rp190.788.082.901.                           Rp193,208,630,440 and Rp190,788,082,901,
                                                                          respectively.

       Pinjaman BNI akan jatuh tempo pada tahun ke 17                     BNI loans will be due on the 17th year from
       sejak Tanggal Efektif.                                             Effective Date.



                                                          167
Page 171
                                                                       The original consolidated financial statements included herein are in
                                                                                                                  the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)              (Expressed in full Rupiah amount, unless otherwise stated)

  4.   PT Bank Mandiri (Persero) Tbk                             .      4.    PT Bank Mandiri (Persero) Tbk

       Berdasarkan Surat dari PT Bank Mandiri (Persero)                      Based on a Letter from PT Bank Mandiri
       Tbk No 4.Ar.JPK/SME/SPPK/0076/ 2023 tanggal 6                         (Persero)       Tbk      No.     4.Ar.JPK/SME/
       Maret 2023 perihal Surat Penawaran Pemberian                          SPPK/0076/2023 dated 6 March 2023 regarding
       Kredit, telah ditentukan sebagai berikut:                             the Letter of Offer for Credit, it has been
                                                                             determined as follows:
       1. Tujuan Penggunaan                                                  1. Purpose of Use
           Pengalihan hak tagih dalam rangka pelaksanaan                        Transfer of billing rights in the context of
           Perjanjian Perdamaian PT Waskita Beton Precast                       implementing the PT Waskita Beton Precast
           Tbk (WSBP) dari 26 Supplier/Sub Kontraktor                           Tbk (WSBP) Settlement Agreement from 26
           kepada PT Bank Mandiri atas invoice yang telah                       Suppliers/Sub-Contractors to PT Bank
           dibiayai dengan fasilitas Accepted Invoice                           Mandiri for invoices that have been financed
           Financing.                                                           with the Accepted Invoice Financing facility.
       2. Fitur dan Ketentuan                                                2. Features and Conditions
           Fitur dan ketentuan fasilitas kredit WSBP sesuai                     Features and conditions of the WSBP credit
           dengan Skema Tranche A:                                              facility in accordance with the Tranche A
                                                                                Scheme:

             No                 Ketentuan/Terms                             Keterangan/Description
              1    Jenis Fasilitas/Facility Type                KMK Post Financing
              2    Jangka Waktu/Time Period                     20 September 2022 sd 20 September 2039
                                                                (17 Tahun sejak Tanggal Berlaku Perjanjian WSBP)/
                                                                17 Years from the Effective Date of the WSBP
                                                                Agreement
              3    Pokok/Principal                              Rp270.691.905.539
              4    Bunga     sebelum   Efektif Perjanjian       Jenis Bunga/Interest         Biaya         Bunga/
                   Perdamaian WSBP/Interest before the          Type                         Interest Expense
                   Effectiveness of the WSBP Settlement
                   Agreement
                                                                Bunga sd jatuh tempo :               21.316.590.997
                                                                invoice yang dilaporkan
                                                                kepada pengurus PKPU
                                                                (10.5% p.a)/ Interest
                                                                until the due date of the
                                                                invoice reported to the
                                                                PKPU        management
                                                                (10.5% p.a)
                                                                Bunga             setelah :          13.290.009.918
                                                                homologasi      sd     19
                                                                September 2022 10.5%
                                                                p.a)/    Interest    after
                                                                homologation         until
                                                                September 19, 2022
                                                                10.5% p.a)
                                                                Jumlah Bunga/Total :                 34.606.600.915
                                                                Interest
              5    Mekasnisme      Pembayaran      Bunga        Seluruh Bunga Tertunggak baik sebelum maupun
                   sebelum Eektif Perjanjian Perdamaian         pada saat proses PKPU berjalan akan ditangguhkan
                   WSBP/Mechanism of Interest Payment           (deferred) dan akan dibayarkan sesuai mekanisme
                   before the Effectiveness of the WSBP         Tranche A, termasuk bunga sejak putusan
                   Settlement Agreement                         pengesahan Perjanjian Perdamaian sapai dengan
                                                                putusan kasasi/ All outstanding interest both before
                                                                and during the PKPU process will be deferred and
                                                                will be paid according to the Tranche A mechanism,
                                                                including interest since the decision to ratify the
                                                                Settlement Agreement until the cassation decision.
              6    Bunga    setelah  efektif    Perjanjian      Berdasarkan Perjanjian Perdamaian WSBP, tingkat
                   Perdamaian WSBP/Interest after effective     suku bunga yang berlaku sesuai jangka waktu
                   WSBP Settlement Agreement                    pelaksanaan Perjanjian Perdamaian WSBP dengan


                                                          168
Page 172
                                                                    The original consolidated financial statements included herein are in
                                                                                                               the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)           (Expressed in full Rupiah amount, unless otherwise stated)

                                                                debitur atas nama WSBP sebagai berikut/ Based on
                                                                the WSBP Settlement Agreement, the interest rate
                                                                that applies according to the implementation period
                                                                of the WSBP Settlement Agreement with debtors on
                                                                behalf of WSBP is as follows:
                                                                       Tahun/Year                            %
                                                                Tahun ke 1 sd ke 9                2% pa
                                                                Tahun ke 10 sd ke 13              3% pa
                                                                Diatas tahun ke 13/               4% pa
                                                                Over 13th year
              7    Mekanisme pembayarn bunga setelah             • Pembayaran bunga akan dilakukan pada tanggal
                   efektif Perjanjian Perdamaian WSBP/               25yang jatuh tempo pada setiap 6 bulan dari
                   Interest payment mechanism after                  tahun berjalan setelah tanggal berlaku diawali
                   the WSBP Settlement Agreement                     sejak bulan Maret 2023/Interest payments will be
                   becomes effective                                 made on the 25th which is due every 6 months of
                                                                     the current year after the effective date starting
                                                                     from March 2023
                                                                 • Dalam hal tanggal pembayaran bunga tersebut
                                                                     bertepatan dengan hari libur termasuk hari Sabtu
                                                                     atau hari libur nasional, pembayaran bunga
                                                                     tersebut akan dilakukan pada hari kerja
                                                                     berikutnya/ In the event that the interest payment
                                                                     date coincides with a holiday including Saturday
                                                                     or a national holiday, the interest payment will be
                                                                     made on the following business day.
              8    Koreksi bunga dan denda sebelum efektif      Bunga, denda dan biaya lainnya dari 26 Supplier
                   Perjanjian Perdamaian WSBP/Correction        WSBP dilakukan koreksi dan dicatat disisi WSBP
                   of interest and penalties prior to the       sebagai/nterest, fines and other fees from 26 WSBP
                   effectiveness of the WSBP Settlement         Suppliers are corrected and recorded on the WSBP
                   Agreement                                    side as:
                                                                • Terhadap bunga sebelum tanggal efektif berlaku
                                                                     Perjanjian Perdamaian WSBP dilakukan koreksi
                                                                     /For interest before the effective date of the
                                                                     WSBP Settlement Agreement, corrections are
                                                                     made.
                                                                • Seluruh benda dan biaya lainnya yang terdahulu
                                                                     dihapuskan/all objects and other costs that were
                                                                     previously written off
              9    Pembentukan fasilitas baru WSBP dan          • Fasilitas baru dibentuk atas nama WSBP yang
                   melnisme Pengalihan/Establishment of a            medncakup pokok sebesar Rp270.691.05.539
                   new WSBP facility and transfer                    dan bunga dicatat sesuai ketentuan pada
                   mechanism                                         Perjanjian Perdamaian WSBP/ A new facility was
                                                                     formed on behalf of WBP which includes a
                                                                     principal amounting to Rp270,691,05,539 and
                                                                     interest is recorded in accordance with
                                                                     the provisions of the WSBP Settlement
                                                                     Agreement
                                                                • Terhadap biaya buga, denda dan biaya lainnya
                                                                     pada Supplier/Sub Kontraktor akan dikorekso
                                                                     sesuai Perjanjian Perdamaian WSBP dan dicatat
                                                                     di sisi WSBP/ Interest costs, fines and other
                                                                     costs to the Supplier/Sub-Contractor will be
                                                                     corrected according to the WSBP Amicable
                                                                     Agreement and recorded on the WSBP side.
                                                                • Mekanisme pengalihan dilakukan secara
                                                                     bertahap sebagai pembentukan fasilitas kredit
                                                                     WSBP sesuai ketentuan yang berlaku di Bank
                                                                     Mandiri     dengan       total   fasilitas   senilai
                                                                     Rp270.691.905.539 dalam rangka pelaksanaan
                                                                     Perjanjian Perdamaian/The transfer mechanism

                                                          169
Page 173
                                                                    The original consolidated financial statements included herein are in
                                                                                                               the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)           (Expressed in full Rupiah amount, unless otherwise stated)

                                                                    is carried out in stages as the establishment of a
                                                                    WSBP credit facility in accordance with
                                                                    the applicable provisions at Bank Mandiri with a
                                                                    total facility of IDR 270,691,905,539 in
                                                                    the context of implementing the Settlement
                                                                    Agreement
             10    Mekanisme Pembayaran Pokok/Principal         Pembayaran pokok dilakukan secara bullet payment
                   Payment Mechanism                            pada tahun ke 17 sejak tanggal berlaku Perjanjian
                                                                Perdamaian WSBP/Principal payments are made in
                                                                bullet payments in the 17th year from the effective
                                                                date of the WSBP Settlement Agreement
             11    Pelunasan dipercepat/Expedited payment       Dimungkinkan            percepatan          pembayaran
                                                                (pre payment) pada tahun ke 10 sejak tanggal
                                                                berlaku apabila hasil pemeriksaan dan evaluasi pada
                                                                tahun ke 7sejak tanggal berlaku oleh Agen
                                                                Pemantau Independen menunkukkan bahwa WSBP
                                                                memiliki       kemampuan          keuangan        untuk
                                                                menyelesaikan kewajibannya/It is possible to
                                                                accelerate payment (prepayment) in the 10th year
                                                                from the effective date if the results of the inspection
                                                                and                     evaluation                     in
                                                                the 7th year from the effective date by the
                                                                Independent Monitoring Agent show that the WSBP
                                                                has the financial capacity to complete its obligations

        Berdasarkan Surat Keterangan No. 143/III/SK/23                     Based on Statement Letter No. 143/III/SK/23
        tanggal 24 Maret 2023 dari notaris Siti Rohmah                     dated March 24, 2023 from Notary Siti Rohmah
        Cahyana, SH telah dibuatkan Akta pada tanggal 24                   Cahyana, SH, a deed was made on March 24,
        Maret 2023 sehubungan dengan fasilitas kredit                      2023 in connection with the credit facility
        yang      diterima   oleh    Perusahaan     dari                   received by the Company from PT Bank
        PT Bank Mandiri (Persero) Tbk berupa Perjanjian                    Mandiri (Persero) Tbk in the form of an
        Modal       Kerja    No.    RCO.BKS/KMK/2023                       Agreement           Working            capital
        senilai Rp270.691.905.539.                                         No. RCO.BKS/KMK/2023 amounting to
                                                                           Rp270,691,905,539.

        Pada tanggal 30 Juni 2023 dan 31 Desember 2022,                    As of June 30, 2023 and December 31, 2022,
        saldo WBP ke PT Bank Mandiri (Persero) Tbk                         the balance of WBP loan from PT Bank Mandiri
        masing-masing sebesar Rp109.994.093.534 dan                        (Persero)       Tbk        amounting     to
        Nihil.                                                             Rp109,994,093,534 and Nil, respectively.

        Pinjaman Mandiri akan jatuh tempo pada tahun ke 17                 Mandiri loans will be due on the 17th year from
        sejak Tanggal Efektif.                                             Effective Date.

  Pihak Ketiga                                                       Third Parties

  Perusahaan                                                         The Company

   1.   Perjanjian Restrukturisasi Induk                             1.    Master Restructuring Agreement

        Berdasarkan Akta Notaris Ashoya Ratam S.H., M.Kn,                  Based on the Notary Deed of Ashoya Ratam
        No. 40 tanggal 25 Agustus 2021, Perusahaan                         S.H., M.Kn, No. 40 dated August 25, 2021,
        menandatangani perjanjian dengan PT Bank Mandiri                   the Company signed agreements with
        (Persero) Tbk, PT Bank Rakyat Indonesia (Persero)                  PT Bank Mandiri (Persero) Tbk, PT Bank
        Tbk, PT Bank Negara Indonesia (Persero) Tbk, PT                    Rakyat Indonesia (Persero) Tbk, PT Bank
        Bank DKI, PT Bank Pembangunan Daerah Jawa                          Negara Indonesia (Persero) Tbk, PT Bank DKI,
        Barat dan Banten Tbk, PT Bank Syariah Indonesia                    PT Bank Pembangunan Daerah Jawa Barat
        Tbk dan PT Bank BTPN Tbk untuk merestrukturisasi                   and Banten Tbk, PT Bank Syariah Indonesia
        kewajiban Perusahaan.                                              Tbk and PT Bank BTPN Tbk to restructure the
                                                                           Company's obligations.




                                                          170
Page 174
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

       Pihak-pihak Bank setuju melakukan resrukturisasi                   The Bank's parties agreed to restructure the
       atas kewajiban-kewajiban pembayaran Perusahaan                     Company's payment liabilities in relation to the
       sehubungan dengan fasilitas-fasilitas pembiayaan                   financing facilities provided by the banks with
       yang diberikan oleh pihak-pihak bank dengan jumlah                 total amount of Rp29,252,309,664,899.
       keseluruhan sebesar Rp29.252.309.664.899.

       Berdasarkan Perjanjian Aksesi pada tanggal                         Based on the Accession Agreement as
       15 September 2021, Pihak-pihak yang melakukan                      September 15, 2021, the Parties carrying out
       Aksesi, yang terdiri dari PT Bank BNP Paribas                      the Accession, consist of PT Bank BNP Paribas
       Indonesia, PT Bank BTPN Tbk, PT Bank China                         Indonesia,     PT      Bank     BTPN      Tbk,
       Construction Bank Indonesia Tbk, PT Bank CTBC                      PT Bank China Construction Bank Indonesia
       Indonesia, PT Bank KEB Hana Indonesia,                             Tbk, PT Bank CTBC Indonesia, PT Bank KEB
       PT Maybank Indonesia Tbk, PT Bank OCBC NISP                        Hana Indonesia, PT Maybank Indonesia Tbk,
       Tbk, Bank of China Ltd, PT Bank Pan Indonesia Tbk,                 PT Bank OCBC NISP Tbk, Bank of China Ltd,
       PT Bank Permata Indonesia Tbk, PT Bank QNB                         PT Bank Pan Indonesia Tbk, PT Bank Permata
       Indonesia Tbk, PT Bank Resona Perdania, PT Bank                    Indonesia Tbk, PT Bank QNB Indonesia Tbk,
       SBI Indonesia, PT Bank Shinhan Indonesia dan                       PT        Bank         Resona         Perdania,
       PT Bank UOB Indonesia, menyatakan untuk menjadi                    PT Bank SBI Indonesia, PT Bank Shinhan
       pihak dalam Perjanjian Restrukturisasi Induk dan                   Indonesia and PT Bank UOB Indonesia,
       berjanji untuk melaksanakan seluruh kewajiban yang                 declares to be a party to the Master
       dinyatakan dalam Perjanjian Restrukturisasi Induk                  Restructuring Agreement and undertakes to
       (Catatan 31.1 Perjanjian Restrukturisasi Induk).                   carry out all obligations stated in the Master
                                                                          Restructuring Agreement (Note 31.1 Master
                                                                          Restructuring Agreement).

       Pada tanggal 30 Juni 2023, saldo pinjaman                          As of June 30, 2023, the Company's loan
       Perusahaan dari PT Bank BTPN Tbk adalah sebesar                    balance from PT Bank BTPN Tbk amounting to
       Rp2.276.032.811.377; PT Bank Pan Indonesia Tbk                     Rp2,276,032,811,377; PT Bank Pan Indonesia
       sebesar Rp1.937.854.730.295; Bank of China Ltd                     Tbk amounting to Rp1,937,854,730,295; Bank
       sebesar      Rp1.140.424.112.008;   PT     Bank                    of     China      Ltd     amounting     to
       Pembangunan Daerah Jawa Barat dan Banten Tbk                       Rp1,140,424,112,008; PT Bank Pembangunan
       sebesar Rp998.222.785.772; PT Shinhan Bank                         Daerah Jawa Barat dan Banten Tbk amounting
       Indonesia sebesar Rp238.064.217.020; PT Bank                       to Rp998,222,785,772; PT Shinhan Bank
       UOB Indonesia sebesar Rp251.102.529.990;                           Indonesia amounting to 251,102,529,990;
       PT Bank Maybank Indonesia Tbk sebesar                              PT Bank UOB Indonesia amounting to
       Rp500.000.000.000; PT Bank Permata Tbk sebesar                     Rp238,064,217,020; PT Bank Maybank
       Rp699.599.183.062; Bank QNB Indonesia sebesar                      Indonesia       Tbk      amounting      to
       Rp417.796.279.058; PT Bank KEB Hana Indonesia                      Rp500,000,000,000; PT Bank Permata Tbk
       sebesar Rp281.805.760.004; PT Bank OCBC NISP                       amounting to Rp699,599,183,062; Bank QNB
       Tbk sebesar Rp281.805.760.004; PT Bank DKI                         Indonesia amounting to Rp417,796,279,058;
       sebesar Rp235.000.000.000; PT Bank China                           PT Bank KEB Hana Indonesia amounting to
       Construction   Bank Indonesia     Tbk sebesar                      Rp281,805,760,004; PT Bank OCBC NISP Tbk
       Rp225.444.608.003; PT Bank CTBC Indonesia                          amounting to Rp281,805,760,004; PT Bank
       sebesar Rp169.083.456.002; PT Bank BNP Paribas                     DKI   amounting to      Rp235,000,000,000;
       Indonesia adalah sebesar Rp154.781.999.763;                        PT Bank China Construction Bank Indonesia
       PT Bank Resona Perdania Indonesia sebesar                          Tbk amounting to        Rp225,444,608,003;
       Rp167.137.162.274; PT Bank SBI Indonesia sebesar                   PT Bank CTBC Indonesia amounting to
       Rp84.541.728.001.                                                  Rp169,083,456,002; PT Bank BNP Paribas
                                                                          Indonesia      adalah     amounting     to
                                                                          Rp154,781,999,763;    PT    Bank    Resona
                                                                          Perdania     Indonesia     amounting    to
                                                                          Rp167,137,162,274; PT Bank SBI Indonesia
                                                                          amounting to Rp84,541,728,001.




                                                          171
Page 175
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

        Pada tanggal 31 Desember 2022, saldo pinjaman                     As of December 31, 2022, the Company's loan
        Perusahaan dari PT Bank BTPN Tbk adalah sebesar                   balance from PT Bank BTPN Tbk amounting to
        Rp2.276.032.811.377; PT Bank Pan Indonesia Tbk                    Rp2,276,032,811,377; PT Bank Pan Indonesia
        sebesar Rp1.941.293.233.348; Bank of China Ltd                    Tbk amounting to Rp1,941,293,233,348; Bank
        sebesar      Rp1.140.424.112.008;   PT     Bank                   of     China         Ltd     amounting     to
        Pembangunan Daerah Jawa Barat dan Banten Tbk                      Rp1,140,424,112,008; PT Bank Pembangunan
        sebesar Rp1.001.276.551.888; PT Shinhan Bank                      Daerah Jawa Barat dan Banten Tbk amounting
        Indonesia sebesar Rp238.064.217.020; PT Bank                      to Rp1,001,276,551,888; PT Shinhan Bank
        UOB Indonesia sebesar Rp264.290.837.080;
        PT Bank Maybank Indonesia Tbk sebesar                             Indonesia amounting to 238,064,217,020;
        Rp500.000.000.000; PT Bank Permata Tbk sebesar                    PT Bank UOB Indonesia amounting to
        Rp699.599.183.062; Bank QNB Indonesia sebesar                     Rp264,290,837,080; PT Bank Maybank
        Rp417.796.279.058; PT Bank KEB Hana Indonesia                     Indonesia        Tbk        amounting      to
        sebesar Rp281.805.760.004; PT Bank OCBC NISP                      Rp500,000,000,000; PT Bank Permata Tbk
        Tbk sebesar Rp279.549.549.429; PT Bank DKI                        amounting to Rp699,599,183,062; Bank QNB
        sebesar Rp235.000.000.000; PT Bank China                          Indonesia amounting to Rp417,796,279,058;
        Construction   Bank Indonesia     Tbk sebesar                     PT Bank KEB Hana Indonesia amounting to
        Rp225.444.608.003; PT Bank CTBC Indonesia                         Rp281,805,760,004; PT Bank OCBC NISP Tbk
        sebesar Rp169.083.456.002; PT Bank BNP Paribas                    amounting         to       Rp279,549,549,429;
        Indonesia adalah sebesar Rp154.781.999.763;                       PT      Bank        DKI      amounting     to
        PT Bank Resona Perdania Indonesia sebesar                         Rp235,000,000,000;       PT     Bank    China
        Rp167.137.162.274; PT Bank SBI Indonesia sebesar                  Construction Bank Indonesia Tbk amounting to
        Rp84.541.728.001.                                                 Rp225,444,608,003; PT Bank CTBC Indonesia
                                                                          amounting to Rp169,083,456,002; PT Bank
                                                                          BNP Paribas Indonesia adalah amounting to
                                                                          Rp154,781,999,763;       PT    Bank   Resona
                                                                          Perdania      Indonesia       amounting    to
                                                                          Rp167,137,162,274; PT Bank SBI Indonesia
                                                                          amounting to Rp84,541,728,001.

   2.   Sindikasi Kredit Modal Kerja PT Bank Mandiri                2.    Working     Capital  Syndication   Credit
        (Persero) Tbk, PT Bank BNI (Persero) Tbk dan PT                   PT    Bank     Mandiri   (Persero)   Tbk,
        Bank BRI (Persero) Tbk                                            PT Bank BNI (Persero) Tbk dan PT Bank BRI
                                                                          (Persero) Tbk

        Berdasarkan akta Notaris Ashoya Ratam, S.H., M.Kn                Based on the deed of Notary Ashoya Ratam,
        No. 38 tanggal 25 Oktober 2021, Perusahaan                       S.H., M.Kn. No. 38 dated October 25, 2021, the
        menandatangani perjanjian Kredit Sindikasi dengan                Company signed a Syndicated Loan agreement
        PT Bank Mandiri (Persero) Tbk, PT Bank BNI                       with PT Bank Mandiri (Persero) Tbk, PT Bank
        (Persero) Tbk dan PT Bank BRI (Persero) Tbk. Bank                BNI (Persero) Tbk and PT Bank BRI (Persero)
        Kreditur tersebut memberikan fasilitas kredit sebesar            Tbk. The creditor bank provides a credit facility
        Rp8.076.463.000.000 dengan sublimit Non Cash                     of Rp8,076,463,000,000 with a Non-Cash Loan
        Loan     sampai     dengan    Rp6.268.359.000.000                sublimit of up to Rp6,268,359,000,000 and
        dan     Supplier    Financing     sampai      dengan             Supplier Financing sublimit of up to
        Rp6.268.359.000.000. Jangka waktu pinjaman ini                   Rp6,268,359,000,000. The term of this loan is a
        maksimal tiga tahun sejak penandatanganan kontrak                maximum of three years from the signing of
        perjanjian dan suku bunga sebesar referance rate                 the contract agreement and the interest rate is
        ditambah margin. Fasilitas Kredit ini diberikan                  the reference rate plus margin. This credit facility
        Kreditur untuk digunakan sebagai modal kerja untuk               is provided by creditors to be used as working
        pelaksaan Proyek dalam rangka Program Pemulihan                  capital for project implementation in the context
        Ekonomi Nasional. Pinjaman ini dijamin oleh Jaminan              of the National Economic Recovery Program.
        Pemerintah sesuai ketentuan Peraturan Menteri                    This loan is guaranteed by Government
        Keuangan Republik Indonesia No. 211/PMK.08/2020.                 Guarantee in accordance with the Regulation of
                                                                         the Minister of Finance of the Republic of
                                                                         Indonesia No. 211/PMK.08/2020.




                                                          172
Page 176
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

       Berdasarkan akta pemindahan tanggal 28 Juni 2022,                 Based on the deed of transfer dated June 28,
       PT Bank BNI (Persero) Tbk mengalihkan sebagian                    2022, PT Bank BNI (Persero) Tbk transferred its
       hak-haknya dan kewajibannya bedasarkan Perjanjian                 rights and obligations based on the Syndicated
       Kredit Sindikasi kepada Bank Pembangunan Daerah                   Credit Agreement to Bank Pembangunan
       Jawa Barat dan Banten Tbk dan PT Bank Sumut.                      Daerah Jawa Barat Tbk and PT Bank Sumut.
       Kewajiban dan hak yang diambil alih Bank                          Obligations and rights taken over by Bank
       Pembangunan Daerah Jawa Barat dan Banten Tbk.                     Pembangunan Daerah Jawa Barat Tbk mainly
       terutama meliputi komitmen berdasarkan Perjanjian                 include commitments under the Syndicated
       Kredit Sindikasi sebesar Rp118.608.226.840, hak                   Credit      Agreement        amounting       to
       atas jumlah pinjaman yang telah dicairkan dan belum               Rp118,608,226,840, the rights to the loan
       dibayarkan Perusahaan sebesar Rp131.391.773.160                   amount that have been disbursed and have not
       dan bunga berdasarkan perjanjian Kredit Sindikasi.                been paid by the Company amounting to
       Kewajiban dan hak yang diambil alih PT Bank Sumut                 Rp131,391,773,160 and interest based on
       terutama meliputi komitmen berdasarkan Perjanjian                 the      Syndicated      Credit     agreement.
       Kredit Sindikasi sebesar Rp35.754.841.279, hak atas               The obligations and rights taken over by
       jumlah pinjaman yang telah dicairkan dan belum                    PT Bank Sumut mainly include commitments
       dibayarkan Perusahaan sebesar Rp64.245.158.721                    under the Syndicated Credit Agreement
       dan bunga berdasarkan perjanjian Kredit Sindikasi                 amounting to Rp35,754,841,279, rights to
       (Catatan 31.2 2. Sindikasi Kredit Modal Kerja                     the loan amount that has been disbursed and
       PT Bank Mandiri (Persero) Tbk, PT Bank BNI                        has not been paid by the Company amounting
       (Persero) Tbk dan PT Bank BRI (Persero) Tbk).                     to Rp64,245,158,721 and interest based on
                                                                         the Syndicated Credit agreement (Note 31.2 2
                                                                         Working Capital Syndication Credit Kerja
                                                                         PT Bank Mandiri (Persero) Tbk, PT Bank BNI
                                                                         (Persero) Tbk dan PT Bank BRI (Persero) Tbk)

       Pada tanggal 30 Juni 2023 dan 31 Desember 2022,                   As of June 30, 2023 and December 31, 2022,
       saldo pinjaman Perusahaan dari Bank Pembangunan                   the Company's loan balance from Bank
       Daerah Jawa Barat dan Banten Tbk adalah sebesar                   Pembangunan Daerah Jawa Barat dan Banten
       Rp190.116.968.257     dan      Rp332.737.785.378;                 Tbk amounting to Rp190,116,968,257 and
       PT Bank Sumut sebesar Rp189.632.090.304                           Rp332,737,785,378; PT Bank Sumut amounting
       dan Rp332.737.785.390.                                            to Rp189,632,090.304 and Rp332,737,785,390,
                                                                         respectively.

   Entitas Anak – WTR                                                Subsidiary – WTR

   a. Kredit Bank Sindikasi PBTR                                    a.    Syndication Bank Credit PBTR

       Berdasarkan Akta Notaris No. 37 tanggal 24 Mei 2017                Based on Notarial Deed No.37 dated May 24,
       oleh Ariani Lakhsmijati Rachim, S.H., Notaris di                   2017 by Ariani Lakhsmijati Rachim S.H., Notary
       Jakarta,    Perusahaan       telah    menandatangani               in Jakarta, the Company entered into Loan
       perjanjian Kredit Sindikasi dengan PT Bank Negara                  Syndication with PT Bank Negara Indonesia
       Indonesia (Persero) Tbk, PT Bank Panin Indonesia                   (Persero) Tbk, PT Bank Panin Indonesia Tbk,
       Tbk,       PT       Bank         ICBC      Indonesia,              PT         Bank           ICBC          Indonesia,
       PT Bank Pembangunan Daerah Sulawesi Selatan                        PT Bank Pembangunan Daerah Sulawesi
       dan Sulawesi Barat, PT Bank Arta Graha                             Selatan dan Sulawesi Barat, PT Bank Arta
       Internasional Tbk, PT Bank Pembangunan Daerah                      Graha     Internasional      Tbk,     PT       Bank
       Maluku dan Maluku Utara, PT Bank Pembangunan                       Pembangunan Daerah Maluku dan Maluku
       Daerah       Daerah        Istimewa       Yogyakarta,              Utara, PT Bank Pembangunan Daerah Daerah
       PT Bank Pembangunan Daerah Jambi, PT Bank                          Istimewa Yogyakarta, PT Bank Pembangunan
       Nagari, PT Bank Pembangunan Daerah Kalimantan                      Daerah Jambi, PT Bank Nagari, PT Bank
       Tengah PT Bank Pembangunan Daerah Bali,                            Pembangunan Daerah Kalimantan Tengah,
       PT Bank Pembangunan Daerah Sumatera Utara,                         PT Bank Pembangunan Daerah Bali,
       PT Bank Pembangunan Daerah Jawa Tengah,                            PT Bank Pembangunan Daerah Sumatera
       PT Bank Negara Indonesia Syariah, PT Bank Jabar                    Utara, PT Bank Pembangunan Daerah Jawa
       Banten Syariah dan PT Bank Aceh Syariah. Keenam                    Tengah, PT Bank Negara Indonesia Syariah,
       belas bank tersebut memberikan fasilitas kredit                    PT Bank Jabar Banten Syariah dan PT Bank
       maksimum sebesar Rp3.220.000.000.000 yang                          Aceh Syariah. These sixteen banks are
       terdiri dari kredit investasi dan kredit bunga                     providing a credit facility with a credit ceiling of
       masa      konstruksi     masing-masing        sebesar              Rp3,220,000,000,000 which consists of
       Rp3.006.150.000.000      dan       Rp213.850.000.000.              investment credit and interest during

                                                          173
Page 177
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

       Kedua fasilitas tersebut diberikan untuk keperluan                 construction              amounting              to
       pembangunan Jalan Tol Ruas Pemalang – Batang                       Rp3,006,150,000,000 and Rp213,850,000,000,
       (Catatan 31 Kredit Modal Kerja Sindikasi 1.a).                     respectively. Both facilities are provided for the
                                                                          development of Pemalang – Batang Toll Road
                                                                          (Note 31 Syndication Working Capital
                                                                          Loan 1.a).

   b. Kredit Bank Sindikasi WBW                                   b. b.   Syndication Bank Credit WBW

       Berdasarkan akta perjanjian kredit sindikasi No. 53,               Based on the syndicated credit agreement deed
       tanggal 21 Desember 2018, WBW telah                                No. 53, dated December 21, 2018, WBW
       menandatangani perjanjian Kredit Sindikasi dengan                  entered into Loan Syndication with PT Bank
       PT Bank Negara Indonesia (Persero) Tbk, PT Bank                    Negara Indonesia (Persero) Tbk, PT Bank
       Rakyat Indonesia (Persero) Tbk, PT Sarana Multi                    Rakyat Indonesia (Persero) Tbk, PT Sarana
       Infrastruktur (Persero) PT Bank Pembangunan                        Multi Infrastruktur (Persero), PT Bank
       Daerah Jawa Timur Tbk, PT Bank Pembangunan                         Pembangunan Daerah Jawa Timur Tbk,
       Daerah Riau Kepri, PT Bank Pembangunan Daerah                      PT Bank Pembangunan Daerah Riau Kepri,
       Nusa Tenggara Timur, PT Bank Pembangunan                           PT Bank Pembangunan Daerah Nusa
       Daerah Maluku dan Maluku Utara, PT Bank                            Tenggara Timur, PT Bank Pembangunan
       Pembangunan Daerah Kalimantan Selatan, PT Bank                     Daerah Maluku and Maluku Utara, PT Bank
       Pembangunan Daerah Sumatera Selatan dan                            Pembangunan Daerah Kalimantan Selatan,
       Bangka Belitung, PT Bank Pembangunan Daerah                        PT Bank Pembangunan Daerah Sumatera
       Kalimantan Barat, PT Bank Pembangunan Daerah                       Selatan dan Bangka Belitung, PT Bank
       Bengkulu, PT Bank Pembangunan Daerah Bali, PT                      Pembangunan Daerah Kalimantan Barat, PT
       Pembangunan Daerah Bank Papua,PT Bank CIMB                         Bank Pembangunan Daerah Bengkulu, PT
       Niaga Tbk Unit usaha Syariah, dan PT Bank                          Bank Pembangunan Daerah Bali, PT
       Pembangunan Daerah Jawa Timur Tbk Unit Usaha                       Pembangunan Daerah Bank Papua, PT Bank
       Syariah dan Lembaga keuangan non bank lainnya                      CIMB Niaga Tbk Business Unit Syariah, and PT
       (Catatan 24 dan 31 Kredit Modal Kerja Sindikasi 1.c).              Bank Pembangunan Daerah Jawa Timur Tbk
                                                                          Business Unit Syariah and other non banking
                                                                          financial institution (Note 24 and 31 Syndication
                                                                          Working Capital Loan 1.c).

   c. Kredit Bank Sindikasi CTP                                      c. Kredit Bank Sindikasi CTP

       Berdasarkan Akta Notaris Perjanjian Kredit Sindikasi               Based on the Syndicated Credit Agreement
       No. 45 tanggal 21 Desember 2018 oleh Ariani L.                     Notarial Deed No.45 dated December 21, 2018
       Rachim, S.H., Notaris di Jakarta yang dinyatakan                   by Ariani L.Rachim, S.H., a Notary in Jakarta
       kembali berdasarkan akta Pernyataan Kembali atas                   which was restated based on the deed of
       Perjanjian Kredit Sindikasi No. 30 tanggal                         Restatement of the Syndicated Credit
       26 Pebruari 2019 oleh Ariani L. Rachim, S.H., Notaris              Agreement No.30 dated February 26, 2019 by
       di Jakarta, CTP telah menandatangani Perjanjian                    Ariani L. Rachim, S.H., a Notary in Jakarta, CTP
       Kredit Sindikasi dengan PT Bank Rakyat Indonesia                   entered into a Loan Syndicated with
       (Persero) Tbk, PT Bank Mandiri (Persero) Tbk, PT                   PT Bank Rakyat Indonesia (Persero) Tbk,
       Sarana     Multi   Infrastruktur   (Persero)    Tbk,               PT      Bank     Mandiri      (Persero)      Tbk,
       PT Bank CIMB Niaga Tbk, PT Bank Negara Indonesia                   PT Sarana Multi Infrastruktur (Persero) Tbk,
       (Persero) Tbk, PT Bank Pan Indonesia Tbk, PT Bank                  PT Bank CIMB Niaga Tbk, PT Bank Negara
       Pembangunan Daerah Jawa Timur Tbk, dan PT Bank                     Indonesia (Persero) Tbk, PT Bank Pan
       DKI (Catatan 24 dan 31 Kredit Modal Kerja Sindikasi                Indonesia Tbk, PT Bank Pembangunan Daerah
       1.d).                                                              Jawa Timur Tbk, and PT Bank DKI (Note 24 and
                                                                          31 Syndication Working Capital Loan 1.d).

   d. Kredit Bank Sindikasi WTTR                                     d. Syndication Bank Credit WTTR

       Berdasarkan Akta No. 3 tanggal 5 Oktober 2018 oleh                 Based on Deed No. 3 dated October 5, 2018 by
       Efran Yuniarto, S.H., M.Kn., Notaris di Jakarta, WTTR              Efran Yuniarto, S.H., M.Kn., Notary in Jakarta,
       dan PT Sarana Multi Infrastruktur (Persero) – Unit                 WTTR and PT Sarana Multi Infrastruktur
       Usaha Syariah, PT Bank Syariah Mandiri, PT Bank                    (Persero) – Unit Usaha Syariah, PT Bank
       BPD Jawa Timur – Unit Usaha Syariah,                               Syariah Mandiri, PT Bank BPD Jawa Timur –
       PT Bank Mega Syariah, PT Bank BJB Syariah                          Unit Usaha Syariah, PT Bank Mega Syariah


                                                          174
Page 178
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

       menandatangani Perjanjian Kredit dengan fasilitas                  , PT Bank BJB Syariah entered into Loan
       kredit maksimum sebesar Rp1.293.201.000.000.                       Agreement providing loan facilities with ceiling
       Fasilitas tersebut diberikan untuk keperluan                       of Rp1,293,201,000,000. Loan facilities are
       pembangunan Jalan Tol Ruas Pasuruan –                              provided for development of Pasuruan -
       Probolinggo (Catatan 31 Kredit Modal Kerja                         Probolinggo Toll Road. (Note 31 Syndication
       Sindikasi).                                                        Working Capital Loan)

       Pada tanggal 30 Juni 2023 saldo pinjaman                           As of June 30, 2023, the Company's loan
       Perusahaan dari PT Bank CIMB Niaga Tbk – Unit                      balance from PT Bank CIMB Niaga Tbk –
       Usaha Syariah sebesar            Rp526.497.287.502,                Business       Unit      Syariah       sebesar
       PT Bank Aceh – Unit Usaha Syariah sebesar                          Rp526,497,287,502, PT Bank Aceh – Business
       Rp385.871.229.326, PT Bank Pembangunan Daerah                      Unit Syariah amounting to Rp385,871,229,326,
       Riau Kepri – Unit Usaha Syariah sebesar                            PT Bank Pembangunan Daerah Riau Kepri –
       Rp72.350.872.217, PT Bank Pembangunan Daerah                       Business    Unit    Syariah    amounting    to
       DIY     –     Unit    Usaha       Syariah    sebesar               Rp72,350,872,217, PT Bank Pembangunan
       Rp48.233.887.733, PT Bank Pembangunan Daerah                       Daerah DIY – Business Unit Syariah amounting
       Jawa Barat dan Banten Tbk - Unit Usaha Syariah                     to Rp48,233,887,733, PT Bank Pembangunan
       sebesar Rp98.175.438.344, PT Bank Pembangunan                      Daerah Jawa Barat dan Banten Tbk - Business
       Daerah Jawa Timur Tbk – Unit Usaha Syariah                         Unit Syariah amounting to Rp98,175,438,344,
       sebesar      Rp206.036.293.595,         PT     Bank                PT Bank Pembangunan Daerah Jawa Timur
       Pembangunan Daerah Kalimantan Barat sebesar                        Tbk – Business Unit Syariah amounting to
       Rp209.641.349.294, PT Bank Kalimantan Selatan -                    Rp206,036,293,595, PT Bank Pembangunan
       Unit Usaha Syariah sebesar Rp48.233.913.826,                       Daerah Kalimantan Barat amounting to
       PT Bank Pembangunan Daerah Sumatera Utara                          Rp209,641,349,294, PT Bank Kalimantan
       sebesar      Rp147.389.469.000,         PT     Bank                Selatan - Business Unit Syariah amounting to
       Pembangunan         Daerah        Jambi      sebesar               Rp48,233,913,826, PT Bank Pembangunan
       Rp154.067.501.224, PT Bank Pembangunan Daerah                      Daerah Sumatera Utara amounting to
       Bengkulu sebesar Rp98.123.752.957, PT Bank                         Rp147,389,469,000, PT Bank Pembangunan
       Pembangunan        Daerah      Lampung       sebesar               Daerah        Jambi        amounting        to
       Rp92.646.888.977, PT Bank Pembangunan Daerah                       Rp154,067,501,224, PT Bank Pembangunan
       DIY   sebesar      Rp51.355.833.744,      PT   Bank                Daerah       Bengkulu        amounting      to
       Pembangunan          Daerah        Bali      sebesar               Rp98,123,752,957, PT Bank Pembangunan
       Rp175.157.503.566, PT Bank Pembangunan Daerah                      Daerah       Lampung         amounting      to
       Kalimantan Tengah sebesar Rp154.067.501.224,                       Rp92,646,888,977, PT Bank Pembangunan
       PT Bank Pembangunan Daerah Kalimantan Selatan                      Daerah DIY amounting to Rp51,355,833,744,
       sebesar      Rp252.191.254.181,         PT     Bank                PT Bank Pembangunan Daerah Bali amounting
       Pembangunan Daerah Sulawesi Tengah sebesar                         to Rp175,157,503,566, PT Bank Pembangunan
       Rp51.355.833.744, PT Bank Pembangunan Daerah                       Daerah Kalimantan Tengah amounting to
       Sulawesi Selatan dan Sulawesi Barat sebesar                        Rp154,067,501,224, PT Bank Pembangunan
       Rp77.033.750.609, PT Bank Pembangunan Daerah                       Daerah Kalimantan Selatan amounting to
       Sumatera Selatan dan Bangka Belitung sebesar                       Rp252,191,254,181, PT Bank Pembangunan
       Rp394.901.068.459, PT Bank Pembangunan Daerah                      Daerah Sulawesi Tengah amounting to
       Riau      dan      Kepulauan        Riau     sebesar               Rp51,355,833,744, PT Bank Pembangunan
       Rp378.314.910.331, PT Bank Pembangunan Daerah                      Daerah Sulawesi Selatan dan Sulawesi Barat
       Papua sebesar Rp567.022.567.692, PT Bank                           amounting to Rp77,033,750,609, PT Bank
       Pembangunan Daerah Maluku dan Maluku Utara                         Pembangunan Daerah Sumatera Selatan dan
       sebesar      Rp119.525.521.827,         PT     Bank                Bangka        Belitung       amounting      to
       Pembangunan Daerah Nusa Tenggara Timur                             Rp394,901,068,459, PT Bank Pembangunan
       sebesar      Rp200.872.540.678,         PT     Bank                Daerah Riau dan Kepulauan Riau amounting to
       Pembangunan Daerah Jawa Timur Tbk sebesar                          Rp378,314,910,331, PT Bank Pembangunan
       Rp857.741.372.040, PT Bank Nagari sebesar                          Daerah        Papua         amounting       to
       Rp196.519.292.000, PT Bank Pan Indonesia Tbk                       Rp567,022,567,692, PT Bank Pembangunan
       sebesar Rp1.073.362.381.498, PT Bank ICBC                          Daerah Maluku dan Maluku Utara amounting to
       Indonesia sebesar Rp200.516.537.806, PT Bank                       Rp119,525,521,827, PT Bank Pembangunan
       Artha     Graha     International    Tbk     sebesar               Daerah Nusa Tenggara Timur amounting to
       Rp154.067.501.225, PT Bank Pembangunan Daerah                      Rp200,872,540,678, PT Bank Pembangunan
       Jawa Tengah sebesar Rp245.649.115.000 dan                          Daerah Jawa Timur Tbk amounting to
       PT Bank Mega Syariah sebesar Rp99.883.080.008.                     Rp857,741,372,040,      PT     Bank     Nagari
                                                                          amounting to Rp196,519,292,000, PT Bank Pan
                                                                          Indonesia        Tbk       amounting        to
                                                                          Rp1,073,362,381,498,      PT    Bank     ICBC

                                                          175
Page 179
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

                                                                          Indonesia amounting to Rp200,516,537,806,
                                                                          PT Bank Artha Graha International Tbk
                                                                          amounting to Rp154,067,501,225, PT Bank
                                                                          Pembangunan      Daerah    Jawa     Tengah
                                                                          amounting to Rp245,649,115,000 and PT Bank
                                                                          Mega Syariah amounting to Rp99,883,080,008.

       Pada tanggal 31 Desember 2022 saldo pinjaman                       As of December 31, 2022, the Company's loan
       Perusahaan dari PT Bank CIMB Niaga Tbk – Unit                      balance from PT Bank CIMB Niaga Tbk –
       Usaha Syariah sebesar             Rp537.668.460.792,               Business    Unit   Syariah    amounting     to
       PT Bank Aceh – Unit Usaha Syariah sebesar                          Rp537,668,460,792, PT Bank Aceh - Business
       Rp385.958.620.142, PT Bank Pembangunan Daerah                      Unit       Syariah        amounting         to
       Riau Kepri – Unit Usaha Syariah sebesar                            Rp385,958,620,142, PT Bank Pembangunan
       Rp72.367.254.734, PT Bank Pembangunan Daerah                       Daerah Riau Kepri - Business Unit Syariah
       DIY     –     Unit     Usaha       Syariah    sebesar              amounting to Rp72,367,254,734, PT Bank
       Rp48.244.813.505, PT Bank Pembangunan Daerah                       Pembangunan Daerah DIY - Business Unit
       Jawa Barat dan Banten Tbk Unit Usaha Syariah                       Syariah amounting to Rp48.244.813.505,
       sebesar Rp98.294.571.048, PT Bank Pembangunan                      PT Bank Pembangunan Daerah Jawa Barat dan
       Daerah Jawa Timur Tbk – Unit Usaha Syariah                         Banten Tbk - Business Unit Syariah amounting
       sebesar                             Rp89.611.410.131,              to Rp98,294,571,048, PT Bank Pembangunan
       PT Bank Pembangunan Daerah Kalimantan Barat                        Daerah Jawa Timur Tbk - Business Unit Syariah
       sebesar Rp208.869.335.408, PT Bank Kalimantan                      amounting to Rp89,611,410,131, PT Bank
       Selatan    –    Unit     Usaha      Syariah   sebesar              Pembangunan Daerah Kalimantan Barat
       Rp48.244.836.488, PT Bank Pembangunan Daerah                       amounting to Rp208,869,335,408, PT Bank
       Sumatera Utara sebesar Rp147.528.948.764,                          Kalimantan Selatan - Business Unit Syariah
       PT Bank Pembangunan Daerah Jambi sebesar                           amounting to Rp48,244,836,488, PT Bank
       Rp151.752.012.453, PT Bank Pembangunan Daerah                      Pembangunan Daerah Sumatera Utara
       Bengkulu          sebesar           Rp97.768.446.562,              amounting to Rp147,528,948,764, PT Bank
       PT Bank Pembangunan Daerah Lampung sebesar                         Pembangunan Daerah Jambi amounting to
       Rp92.318.338.073, PT Bank Pembangunan Daerah                       Rp151,752,012,453, PT Bank Pembangunan
       DIY            sebesar              Rp50.584.004.152,              Daerah       Bengkulu       amounting       to
       PT Bank Pembangunan Daerah Bali sebesar                            Rp97,768,446,562, PT Bank Pembangunan
       Rp173.644.452.794, PT Bank Pembangunan Daerah                      Daerah      Lampung         amounting       to
       Kalimantan               Tengah               sebesar              Rp92,318,338,073, PT Bank Pembangunan
       Rp151.752.012.453, PT Bank Pembangunan Daerah                      Daerah DIY amounting to Rp50,584,004,152,
       Kalimantan               Selatan              sebesar              PT Bank Pembangunan Daerah Bali amounting
       Rp249.520.459.014, PT Bank Pembangunan Daerah                      to Rp173,644,452,794, PT Bank Pembangunan
       Sulawesi                Tengah                sebesar              Daerah Kalimantan Tengah amounting to
       Rp50.584.004.152, PT Bank Pembangunan Daerah                       Rp151.752.012.453, PT Bank Pembangunan
       Sulawesi Selatan dan Sulawesi Barat sebesar                        Daerah Kalimantan Selatan amounting to
       Rp75.876.006.232, PT Bank Pembangunan Daerah                       Rp249,520,459,014, PT Bank Pembangunan
       Sumatera Selatan dan Bangka Belitung sebesar                       Daerah Sulawesi Tengah amounting to
       Rp394.304.372.293, PT Bank Pembangunan Daerah                      Rp50,584,004,152, PT Bank Pembangunan
       Riau      dan      Kepulauan         Riau     sebesar              Daerah Sulawesi Selatan dan Sulawesi Barat
       Rp377.945.120.678, PT Bank Pembangunan Daerah                      amounting to Rp75,876,006,232, PT Bank
       Papua sebesar Rp559.690.096.735, PT Bank                           Pembangunan Daerah Sumatera Selatan dan
       Pembangunan Daerah Maluku dan Maluku Utara                         Bangka       Belitung       amounting       to
       sebesar      Rp118.502.612.905,          PT     Bank               Rp394,304,372,293, PT Bank Pembangunan
       Pembangunan Daerah Nusa Tenggara Timur                             Daerah Riau dan Kepulauan Riau amounting to
       sebesar      Rp200.141.744.754,          PT     Bank               Rp377,945,120,678, PT Bank Pembangunan
       Pembangunan Daerah Jawa Timur Tbk sebesar                          Daerah        Papua        amounting        to
       Rp855.192.762.932, PT Bank Nagari sebesar                          Rp559,690,096,735, PT Bank Pembangunan
       Rp196.705.265.039, PT Bank Pan Indonesia Tbk                       Daerah     Maluku     dan    Maluku     Utara
       sebesar Rp1.067.748.824.453, PT Bank ICBC                          amounting to Rp118,502,612,905, PT Bank
       Indonesia sebesar Rp199.880.289.927, PT Bank                       Pembangunan Daerah Nusa Tenggara Timur
       Artha     Graha      International    Tbk     sebesar              amounting to Rp200,141,744,754, PT Bank
       Rp151.752.012.451, PT Bank Pembangunan Daerah                      Pembangunan Daerah Jawa Timur Tbk
       Jawa Tengah sebesar Rp245.881.581.291 dan                          amounting to Rp855,192,762,932, PT Bank
       PT Bank Mega Syariah sebesar Rp100.099.493.347.                    Nagari amounting to Rp196,705,265,039,
                                                                          PT Bank Pan Indonesia Tbk amounting to
                                                                          Rp1,067,748,824,453,     PT    Bank     ICBC

                                                          176
Page 180
                                                                    The original consolidated financial statements included herein are in
                                                                                                               the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                               PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                         AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                           NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                     FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                            AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                   MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                       (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)           (Expressed in full Rupiah amount, unless otherwise stated)

                                                                            Indonesia amounting to Rp199,880,289,927,
                                                                            PT Bank Artha Graha International Tbk
                                                                            amounting to Rp151,752,012,451, PT Bank
                                                                            Pembangunan       Daerah   Jawa     Tengah
                                                                            amounting to Rp245,881,581,291 and PT Bank
                                                                            Mega        Syariah      amounting       to
                                                                            Rp100,099,493,347.

   Entitas Anak – WKR                                                 Subsidiary – WKR

   PT Bank Jtrust Indonesia Tbk                                       PT Bank Jtrust Indonesia Tbk

   Pada tanggal 30 November 2021, Grup menandatangani                 On November 30, 2021, the Company entered
   kontrak perjanjian No. 131 dengan PT Bank Jtrust                   contract agreement No. 131 with PT Bank Jtrust
   Indonesia Tbk terkait dengan fasilitas pinjaman sebesar            Indonesia Tbk related to loan facility amounting to
   Rp65.000.000.000. Fasilitas pinjaman ini hanya dapat               Rp65,000,000,000. This loan facility will be used
   digunakan untuk modal kerja WKR di Vasaka Residential              specifically for working capital owned WKR, in
   Bali, Denpasar. Saldo pokok terutang dari fasilitas ini            Vasaka        Residential     Bali,      Denpasar.
   sebesar Rp65.000.000.000 dengan jangka waktu fasilitas             The outstanding principal balance amounting to
   pinjaman adalah 60 bulan setelah penandatanganan                   Rp65,000,000,000 with term of 60 months after
   kontrak perjanjian dengan tingkat suku bunga 10,55% per            signing contract with interest rate of 10,55% per
   tahun.                                                             annum.

   Pinjaman tersebut dijamin dengan tanah seluas 11.657               The credit facilities are secured by land square of
   m2 di lokasi proyek pembangunan Vasaka Residential                 11,657 m2 located on project development of
   Bali dan agunan fidusia berupa piutang usaha.                      Vasaka Residential Bali and cessie of receivables
                                                                      from customers.

   Fasilitas ini mensyaratkan Perusahaan untuk memelihara             These facilities require the Company to maintain
   rasio keuangan tertentu:                                           financial ratio.

    a.   Current ratio > 1x                                            a.    Current ratio at > 1x
    b.   Debt to equity ratio < 5x                                     b.    Debt to equity ratio < 5x
    c.   Rasio modal disetor terhadap total utang di bank              c.    Ratio from fully paid capital to total bank loan
         min 10%                                                             min 10%
    d.   EBITDA bernilai positif                                       d.    EBITDA has positive

   Pada tanggal 30 Juni 2023 dan 31 Desember 2022,                    As of June 30, 2023 and December 31, 2022,
   terdapat saldo pinjaman WKR dari PT Bank Jtrust                    the balance of WKR’s loan balance from PT Bank
   Indonesia Tbk sebesar Rp60.937.500.000 dan                         Jtrust     Indonesia   Tbk     amounting     to
   Rp65.000.000.000.                                                  Rp60,937,500,000,     and     Rp65,000,000,000,
                                                                      repectively.

   Entitas Anak – WKI                                                 Subsidiary – WKI

   PT Bank Pembangunan Daerah Jawa Barat dan                          PT Bank Pembangunan Daerah Jawa Barat dan
   Banten Tbk                                                         Banten Tbk

   Berdasarkan        Penawaran         Pemberian      Kredit         Based on Credit Offering No. 115/KKO-KO2/2019
   No. 115/KKO-KO2/2019 tanggal 30 Oktober 2019,                      dated October 30, 2019, PT Waskita Karya
   PT Waskita Karya Infrastruktur memperoleh fasilitas                Infrastruktur obtained credit facilities from PT Bank
   kredit dari PT Bank Pembangunan Daerah Jawa Barat                  Pembangunan Daerah Jawa Barat dan Banten Tbk
   dan Banten Tbk berupa:                                             in the form of:
   a. Fasilitas Kredit Investasi I dengan maksimal pinjaman           a. Investment Credit Facility I with a maximum loan
      Rp142.395.000.000 dengan tingkat suku bunga                         of Rp142,395,000,000 with an interest rate of
      10,50% p.a efektif floating rate. Jangka waktu fasilitas            10.50% p.a effective floating rate. Duration of
      sampai dengan 12 Agustus 2025.                                      facility until August 12, 2025.




                                                          177
Page 181
                                                                    The original consolidated financial statements included herein are in
                                                                                                               the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                               PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                         AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                           NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                     FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                            AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                   MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                       (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)           (Expressed in full Rupiah amount, unless otherwise stated)

   b. Fasilitas Kredit 2 – KI IDC dengan maksimal pinjaman            b. Credit Facility 2 - KI IDC with a maximum loan
      Rp2.123.000.000 dengan tingkat suku bunga 10,50%                   of Rp2,123,000,000 with an effective interest
      p.a efektif floating rate. Jangka waktu fasilitas sampai           rate of 10.50% p.a effective floating rate.
      dengan 12 Agustus 2025.                                            Duration of facility until August 12, 2025.
   c. Fasilitas Kredit KMK R/C Terbatas Swicthable Non                c. KMK R/C Credit Facility Limited Swicthable Non
      Cash Loan (SCF) dengan maksimal pinjaman                           Cash Loan (SCF) with a maximum loan
      Rp50.000.000.000 dengan tingkat suku bunga                         Rp50,000,000,000 with an effective interest rate
      10,00% p.a efektif floating rate. Jangka waktu fasilitas           of 10.00% p.a floating rate. Facility period is up
      sampai dengan 11 November 2021.                                    to November 11, 2021.

   Pinjaman ini dijamin dengan sebidang tanah dan                     This loan is secured by a plot of land and a building
   bangunan dengan estimasi luas tanah 51.848 m 2 dan                 with an estimated land area of 51,848 m2 and a
   luas bangunan 8.000 m2, mesin-mesin dengan nilai                   building area of 8,000 m2, machines with a value of
   sebesar Rp58.300.000.000, piutang usaha sebesar                    Rp58,300,000,000, both existing and accounts
   Rp95.000.000.000, dan letter of undertaking notary dari            receivable amounting to Rp95,000,000,000, and a
   pemegang saham.                                                    letter of undertaking notary from the shareholders.

   Pembatasan terhadap pinjaman ini antara lain:                      Restrictions on this loan include:

   a. Memindahtangankan agunan;                                       a. Transferring collaterall;
   b. Memperoleh fasilitas kredit untuk proyek yang sama              b. Obtain credit facilities for the same project that
      yang sudah dibiayai oleh bank;                                     has been financed by the bank;
   c. Menjaminkan harta kekayaan perusahaan yang                      c. Securing company assets pledged to other
      dijaminkan kepada pihak lain;                                      parties;
   d. Mengajukan permohonan dan atau menyuruh pihak                   d. Submit an application and or order another party
      lain mengajukan permohonan kepada pengadilan                       to submit an application to the court to be
      untuk dinyatakan pailit atau penundaan pembayaran                  declared bankrupt or postpone payment of debt;
      utang;                                                          e. Give up part or all of the rights and or obligations
   e. Menyerahkan sebagian atau seluruh hak dan atau                     of WKI for credit facilities to other parties.
      kewajiban WKI atas fasilitas kredit kepada pihak lain.

   Pada tanggal 30 Juni 2023 dan 31 Desember 2022, saldo              As of June 30, 2023 and December 31, 2022,
   pinjaman WKI dari PT Bank Pembangunan Daerah Jawa                  the balance of WKI’s loan from PT Bank
   Barat dan Banten Tbk masing-masing sebesar                         Pembangunan Daerah Jawa Barat dan Banten Tbk
   Rp112.627.609.265 dan Rp114.627.609.265.                           amounting    to     Rp112,627,609,265,   and
                                                                      Rp114,627,609,265, respectively.

   Pada tanggal 30 Juni 2023 dan 31 Desember 2022,                    As of June 30, 2023 and December 31, 2022, WKI’s
   terdapat saldo pinjaman WKI yang jatuh tempo dalam                 current portion of long-term loan balance from
   setahun kepada PT Bank Pembangunan Daerah Jawa                     PT Bank Pembangunan Daerah Jawa Barat dan
   Barat dan Banten Tbk sebesar 18.080.000.000 dan                    Banten Tbk amounting to Rp18,080,000,000 and
   Rp8.000.000.000.                                                   Rp8,000,000,000, respectively.

   Entitas Anak – WBP                                                 Subsidiary – WBP

   1. PT Bank BTPN Tbk                                                1. PT Bank BTPN Tbk

       Berdasarkan  perubahan      Perjanjian     Fasilitas               Based on the amendment to Facility Agreement
       No. L/2020/WBG/X/07 tanggal 12 Oktober 2020,                       No. L/2020/WBG/X/07 dated October 12, 2020,
       WBP      memperoleh    fasilitas    kredit     dari                WBP obtained a credit facility from PT Bank
       PT Bank BTPN Tbk (Catatan 23) sebagai berikut:                     BTPN Tbk (Note 23) as follows:

        1.   Pinjaman untuk tujuan modal kerja sebesar                   1.    Loan for working capital purposes
             Rp250.000.000.000, dengan jangka waktu                            amounting to Rp250,000,000,000, with a
             sampai dengan tanggal 30 April 2021 dengan                        term until April 30, 2021 with an interest rate
             suku bunga 9% per tahun.                                          of 9% per annum




                                                          178
Page 182
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

        2.   Commercial LC untuk tujuan impor atau                      2.    Commercial LC for purposes of importing or
             pembelian lokal atas bahan baku atau peralatan                   local purchasing of raw materials or
             untuk kegiatan bisnis WBP melalui penerbitan                     equipment for WBP business activities
             LC dan LC usance lokal, sight, LC usance,                        through the issuance of LC and LC local
             payable at sight (LC UPAS), LC usance payable                    usance, sight, LC usance, payable
             at    usance        (LC    UPAU)      sebesar                    at sight (LC UPAS), LC usance payable
             Rp850.000.000.000, dengan jangka waktu                           at usance (LC UPAU) amounting to
             sampai dengan tanggal 30 April 2021                              Rp850,000,000,000, with the term until April
                                                                              30, 2021

        3.   Acceptance untuk tujuan akseptasi LC usance                 3. Acceptance for purposes of LC usance or
             ataupun LC lokal sebesar Rp850.000.000.000,                    local LC of Rp850,000,000,000, with
             dengan jangka waktu enam (6) bulan.                            the term of six (6) months.

        4.   Loan on note trust receipt untuk tujuan                     4. Loan on note trust receipt for payment of LC
             pembayaran LC ataupun LC lokal sebesar                         or local LC of Rp850,000,000,000, with a
             Rp850.000.000.000, dengan jangka waktu                         term of three (3) months from the LC due
             selama tiga (3) bulan sejak tanggal jatuh tempo                date or if shorter and may be extended to six
             LC atau apabila lebih singkat dapat                            (6) months from the date of issuance of LC
             diperpanjang hingga enam (6) bulan dari                        or local LC with interest rate of 9% per
             tanggal penerbitan LC ataupun LC lokal, dengan                 annum.
             suku bunga 9% per tahun.

        5.   Guarantee untuk tujuan penerbitan bank garansi              5. Guarantee for issuance of bank guarantee in
             dalam bentuk payment bond, bid bond,                           the form of payment bond, bid bond,
             performance bond, dan maintenance bond,                        performance bond, and maintenance bond,
             sehubungan dengan bisnis peminjam, sebesar                     in connection with the borrower's business
             Rp850.000.000.000, dengan jangka waktu                         amounting to Rp850,000,000,000, with a
             selama 12 bulan namun tidak termasuk periode                   period of 12 months but excluding
             klaim 30 hari kalender.                                        the 30-days calendar claim period.

        6.   Loan on note account payable financing untuk                6. Loan on note account payable financing
             tujuan pembiayaan terkait dengan pembayaran                    for     financing  purposes      related   to
             kepada      supplier    peminjam     sebesar                   payments to the borrower's suppliers of
             Rp850.000.000.000, dengan jangka waktu                         Rp850,000,000,000, with a maximum period
             maksimum selama enam (6) bulan dan bersifat                    of six (6) months and is non-rolloverable and
             non-rolloverable, dengan suku bunga 8,8% per                   interest rate 8.8% per annum.
             tahun.
                                                                         7. Loan on note discounted account payable
        7.   Loan on note discounted account payable                        financing for financing purposes related to
             financing untuk tujuan pembiayaan terkait                      payments to the borrower's suppliers of
             dengan pembayaran kepada supplier peminjam                     Rp850,000,000,000, with a maximum period
             sebesar Rp850.000.000.000, dengan jangka                       of six (6) months and is nonextendable and
             waktu maksimum selama enam (6) bulan dan                       interest rate 8.8% per annum.
             bersifat non-rolloverable, dengan suku bunga
             8,8% per tahun.

        8.   Loan on Note Account Receivable Financing                   8. Loan on Note Account Receivable Financing
             untuk tujuan pembiayaan terkait piutang-piutang                for financing purposes related to borrower's
             peminjam     terhadap pelanggan sebesar                        receivables to customers amounting to
             Rp500.000.000.000, dengan jangka waktu                         Rp500,000,000,000,000, with a maximum
             maksimum selama 4 (empat) bulan dan bersifat                   term of 4 (four) months and non-rolloverable,
             non-rolloverable, dengan suku bunga 8,8% per                   with an interest rate of 8.8% per annum.
             tahun.

       Fasilitas pinjaman ini dijamin oleh piutang usaha saat     36.   These loan facilites are collaterized by all current
       ini atau akan datang dengan nilai penjaminan                     or future accounts receivable with minimum
       minimum sebesar Rp1.495.103.746.768 atau 125%                    collateral       value         amounting          to
       dari limit gabungan yang sudah diikat secara fidusia.            Rp1,495,103,746,768 or 125% of the combined
                                                                        limit and which has been tied by fiduciary.


                                                          179
Page 183
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

       Pembatasan:                                                37.     Negative covenants:
                                                                  38.
       1. Memasang atau mengizinkan adanya atau                   39.     1. Installing or permitting the presence or
          dipasangnya Hak Jaminan atas aset-asetnya;                         installation of security rights over its assets;

       2. Menjual, mengalihkan, atau melepaskan aset-                     2. Sell, transfer, or otherwise dispose of its
          asetnya dengan ketentuan-ketentuan dimana                          assets with the provisions in which these
          aset-aset tersebut dapat disewakan atau dibeli                     assets can be leased or bought back by
          kembali oleh Peminjam;                                             the Borrower;

       3. Menjual,   mengalihkan,    atau        melepaskan               3. Sell, transfer, or dispose of its receivables
          piutangnya dengan hak regres;                                      with resource;

       4. Mengadakan pengaturan apapun dimana uang                        4. Entered into any arrangement where
          atau manfaat bank atau rekening lain dapat                         the money or the benefits of a bank or other
          digunakan   untuk   pembayaran,     dilakukan                      account may be used for payments, made
          kompensasi (set off) atau dimungkinkannya                          compensation (set off) or the possibility of
          penggabungan beberapa rekening; atau                               combining multiple accounts;

       5. Mengadakan pengaturan prioritas penerimaan                      5. Hold priority setting receipts have the same
          pembayaran yang memiliki dampak yang sama.                         effect.

       Berdasarkan Perjanjian Perdamaian dalam PKPU                       Based on the Reconciliation Agreement in
       fasilitas pinjaman ini direstrukturisasi menjadi Utang             PKPU this loan facility was restructured into
       Bank Jangka Panjang. Pada tanggal 30 Juni 2023                     Long-Term Bank Loans. As of June 30, 2023
       dan 31 Desember 2022 saldo pinjaman jangka                         and December 31, 2022, the balance of loan of
       panjang WBP kepada PT Bank BTPN Tbk masing-                        WBP to PT Bank BTPN Tbk amounting to
       masing        sebesar      Rp221.268.094.738       dan             Rp221,268,094,738 and Rp218,460,388,244,
       Rp218.460.388.244.                                                 respectively

       Pinjaman BTPN akan jatuh tempo pada tahun ke 17                    BTPN loans will be due on the 17th year from
       sejak Tanggal Efektif                                              Effective Date

   2. PT Bank Permata Tbk                                               2. PT Bank Permata Tbk

       Berdasarkan         Perjanjian          Pembiayaan                 Based      on     the   Financing   Agreement
       No.    451/BP/LOO/CRC-JKT/WB/VIII/2021        pada                 No. 451/BP/LOO/CRC-JKT/WB/VIII/2021 On
       tanggal 13 Agustus 2021, WBP memperoleh fasilitas                  August 13, 2021, WBP obtained an Omnibus
       pembiayaan Omnibus sebesar Rp400.000.000.000                       financing facility of Rp400,000,000,000 with a
       dengan jangka waktu sampai dengan tanggal 26 Juli                  term of up to July 26, 2022, with the following
       2022, dengan sub limit sebagai berikut:                            sub-limits:

        1.   LC/SKBDN/PIF/BG untuk pembelian bahan                         1.    LC/SKBDN/PIF/BG for the purchase of
             baku, peralatan-peralatan, dan pembayaran                           raw materials, equipment, and sub-
             sub-kontraktor yang dibutuhkan sehubungan                           contractor payments needed in connection
             dengan proyek Nasabah, untuk pembiayaan                             with the Customer's project, for financing
             LC/SKBDN Nasabah yang jatuh tempo, serta                            the Customer's LC/SKBDN that is due, as
             untuk memenuhi kebutuhan BG atas proyek                             well as to meet BG needs for the project
             yang      didapatkan    Nasabah       sebesar                       obtained by the Customer amounting to
             Rp400.000.000.000 dengan suku bunga                                 Rp400,000,000,000 with an interest rate of
             sebesar 9,5% per tahun dan 10% per tahun                            9.5% per annum and 10% per annum for
             untuk PIF.                                                          PIF.
        2.   Payable Services untuk membiayai tagihan atau                 2.   Payable Services to finance Non-LC/non-
             transaksi      Non-LC/non-SKBDN          atas                      SKBDN invoices or transactions for trade in
             perdagangan barang terkait dengan proyek-                          goods related to projects undertaken by
             proyek yang dikerjakan Nasabah sebesar                             the Customer in the amount of
             Rp400.000.000.000 dengan suku bunga                                Rp400,000,000,000 with an interest rate of
             sebesar 10% per tahun.                                             10% per annum.




                                                          180
Page 184
                                                                    The original consolidated financial statements included herein are in
                                                                                                               the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

        3.   Musyarakah     Mutanaqisah    (MMQ)    atau                   3.  Musyarakah Mutanaqisah (MMQ) or
             Revolving Financing iB merupakan pembiayaan                       Revolving Financing iB is financing for
             kebutuhan umum modal kerja sehubungan                             general working capital needs in
             dengan aktivitas usaha Nasabah sebesar                            connection with the Customer's business
             Rp300.000.000.000 dengan suku bunga                               activities of Rp300,000,000,000 with an
             sebesar 11% per tahun.                                            interest rate of 11% per annum.
        4.   Revolving Loan untuk pembiayaan kebutuhan                      4. Revolving Loan to finance general working
             umum modal kerja sehubungan dengan aktivitas                       capital needs in connection with the
             usaha Nasabah sebesar Rp100.000.000.000                            Customer's      business   activities   of
             dengan suku bunga sebesar 10,5% per tahun.                         Rp100,000,000,000 with an interest rate of
                                                                                10.5% per annum.
                                                                  40.
       Penggunaan Limit dan Sub Limit secara keseluruhan          41.     The use of Limit and Sub Limit as a whole may
       tidak boleh melebihi RP400.000.000.000.                            not exceed Rp400,000,000,000.

       Pembatasan terhadap tindakan:                              42.     Restriction of covenant:
                                                                  43.

       1. Bertindak sebagai penjamin terhadap hutang              44.     1. Binds itself as surety against the other party,
          pihak lain, kecuali hutang dagang yang dibuat                      except in order to perform daily business
          dalam rangka menjalankan usaha sehari-hari;                        activites;
       2. Mengubah sifat dan kegiatan usaha yang sedang                   2. Change the business activities or run
          dijalankan atau melakukan kegiatan usaha diluar                    the new business opening other than an
          kegiatan usahanya sehari-hari;                                     existing business;

       3. Menjaminkan,  mengalihkan,   menyewakan,                        3. Mortgaging, transferring, leasing, submitting
          menyerahkan kepada pihak lain atas barang                          collateral to the other party;
          jaminan.

       4. Memberikan pinjaman maupun fasilitas keuangan                   4. Provide loans or other financial facility to or
          kepada atau dari pihak lain kecuali dalam jangka                   from the other party except for short-term
          pendek dan dalam rangka menunjang kegiatan                         and in order to drive the daily business
          usahanya sehari-hari;                                              activities;

       5. Melakukan penyertaan yang              berpengaruh              5. Make new investments that could affect to
          terhadap kemampuan membayar;                                       the payment quality;

       6. Melakukan tindakan lainnya yang dapat                           6. Taking      actions    that             could        affect
          menyebabkan atau terganggunya kewajiban yang                       the obligation to the bank;
          terhutang kepada bank;

       7. Melakukan pembubaran, penggabungan usaha                        7. Liquidation  of   corporate,  business
          dan/ atau peleburan dengan Perusahaan lain atau                    combination, and/ or merger with other
          memperoleh sebagian besar dari aset dari                           Company or obtain the part of other
          Perusahaan lain atau bentuk perubahan usaha                        Company’s assets or other business
          lainnya;                                                           changes;

       8. Mengubah susunan dan jumlah kepemilikan                         8. Change the form and quantities of
          pemegang saham tertutup dan/ atau pemegang                         the shareholder (except Stated Owned
          saham pengendali Perusahaan terbuka (kecuali                       Enterprise)
          BUMN);

       9. Membayar atau menyatakan dapat dibayar suatu                    9. Pay or declare of dividend or distribute the
          dividen atau pembagian keuntungan berupa                           gain in any form of shares issued;
          apapun juga atas saham yang dikeluarkan;

       10. Membayar kembali tagihan atau piutang berupa                   10. Repay the bills or receivables that will given
           apapun juga yang sekarang telah dan/ atau                          now and/ or later from shareholders.
           dikemudian hari akan diberikan oleh pemegang
           saham.



                                                          181
Page 185
                                                                    The original consolidated financial statements included herein are in
                                                                                                               the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                               PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                         AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                           NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                     FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                            AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                   MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                       (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)           (Expressed in full Rupiah amount, unless otherwise stated)

       Berdasarkan Perjanjian Perdamaian dalam PKPU                        Based on the Reconciliation Agreement in
       fasilitas pinjaman ini direstrukturisasi menjadi Utang              PKPU this loan facility was restructured into
       Bank Jangka Panjang. Pada tanggal 30 Juni 2023                      Long-Term Bank Loans. As of June 30, 2023
       dan 31 Desember 2022, saldo pinjaman jangka                         and December 31, 2022, the balance of long-
       panjang WBP kepada PT Bank Permata Tbk masing-                      term loan of WBP to PT Bank Permata Tbk
       masing        sebesar      Rp165.729.563.328       dan              amounting    to   Rp165,729,563,328      and
       Rp160.941.525.993.                                                  Rp160,941,525,993, respectively.

       Pinjaman PT Bank Permata Tbk akan jatuh tempo                       PT Bank Permata Tbk loans will be due on
       pada tahun ke 17 sejak Tanggal Efektif                              the 17th year from Effective Date

   3. PT Bank CTBC Indonesia                                             3. PT Bank CTBC Indonesia

       Fasilitas pinjaman ini dijamin oleh piutang usaha dari      45.     This loan facility is colaterallized by trade
       proyek Perusahaan untuk proyek Pemerintah                           accounts receivable from the Company project
       minimal 125% dari pinjaman yang beredar saat ini                    for a Government project for minimum of 125%
       yang sudah diikat secara fidusia.                                   of current outstanding loan which ties by
                                                                           fiduciary.
                                                                   46.
       Pembatasan terhadap tindakan:                               47.     Negative covenants or restrictions:
                                                                   48.
       1. Mengubah    kegiatan  usaha    sebagaimana               49.     1. Changing the business activities as stated in
          tercantum dalam anggaran dasar yang dapat                           the Company’s article of association that
          mengurangi kemampuan melunasi fasilitas kredit.                     could reduce the ability to pay off the credit
                                                                              facility.
       2. Menjual atau mengalihkan seluruh aset                    50.     2. Sell or transfer all of assets of the Company
          Perusahaan dalam satu transaksi atau dalam                          in a single transaction or in multiple
          beberapa transaksi, kecuali:                                        transactions, except:

           -   Menjual atau mentransfer aset dibawah                           •    Selling or transferring assets under
               ketentuan arm’s length dan dengan tujuan                             arrangement that are at arm’s length and
               melakukan kegiatan usaha;                                            in order to run the daily business
                                                                                    activities;
           -   Menjual atau mentransfer aset sebagai                           •    Selling or transferring assets as a replace
               pengganti atau diganti dengan aset lain yang                         or to be replaced with another
               sebanding atau lebih baik menurut jenis, sifat,                      comparable assets or better in type,
               kualitas;                                                            nature, quality;
           -   Menjual atau mengalihkan aset untuk                             •    Selling or transferring assets for
               keperluan reorganisasi pemerintah Republik                           the       purpose       of     government
               Indonesia selama penjualan aset tidak                                reorganization of the Republic of
               memiliki hasil material;                                             Indonesia as long as the sale of assets
                                                                                    did not have a material result;
           -   Menjual atau mentransfer aset yang tidak                        •    Selling or transferring assets that are not
               berguna atau tidak digunakan dengan                                  useful or are not anymore used with
               persyaratan arm’s length; dan                                        the requirements of arm’s length; and
           -   Penjualan pengalihan aset per tahun melebihi                    •    Selling of transferring assets per year
               Rp500.000.000.000.                                                   exceeding of Rp500,000,000,000.

       3. Mengubah operasional bisnis saat ini yang dapat          51.     3. Changing the operation of current business
          menyebabkan hasil material kecuali diwajibkan                       that may cause material impact unless
          oleh hukum yang berlaku;                                            required by appllicable law

       4. Penggabungan, pemisahan, likuidasi atau                  52.     4. Merging, business combination, separation,
          rekonstruksi Perusahaan kecuali persyaratan                         liquidation or corporate reorganization
          sebagai berikut:                                                    except the following requirements:

           •   Reorganisasi    dapat    dilakukan    oleh                      •    Reorganization can be done by
               Pemerintah Republik Indonesia selama tidak                           the Government of the Republic of
               memiliki dampak yang material;                                       Indonesia as long as the impact is not
                                                                                    material;


                                                          182
Page 186
                                                                     The original consolidated financial statements included herein are in
                                                                                                                the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                          AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                      FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                             AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                    MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                        (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)            (Expressed in full Rupiah amount, unless otherwise stated)

           •   Tindakan Perusahaan dengan anggota lain                          •    The       corporate       actions       with
               dalam kelompok dengan ketentuan mengikuti                             other    members       in     the     group
               persyaratan;                                                          with      the     provision       following
                                                                                     the requirements;
           •   Perusahaan akan bertahan sebagai badan                           •    The Company will survive as legal entity
               hukum dan akan memiliki status hukum                                  and will have the legal status after
               setelah tindakan korporasi; dan                                       the corporate action; and
           •   Pemisahan dimana Perusahaan menjadi                              •    Separation which the Company becomes
               pemegang saham terbesar.                                              the mayor shareholder.

       5. Perubahan Anggaran Dasar              yang      dapat     53.     5. Changes in the Articles of Association that
          menimbulkan akibat material;                                         can lead to material impact;

       6. Mengikat dirinya sendiri sebagai jaminan                  54.     6. Bind itself as a collateral against the other
          terhadap pihak lain dan/ atau menjamin kekayaan                      party and/ or pledging the Company’s assets
          Perusahaan kepada pihak lain, kecuali yang                           to other parties, except those that are
          sudah ada;                                                           already existing;

       7. Usulkan berkas kebangkrutan atau penundaan                55.     7. Proposing a file of bankruptcy or
          pembayaran utang kepada pihak yang                                   postponement of debt payment to authorized
          berwenang; dan                                                       parties; and

       8. Melunasi utang kepada pemegang saham/utang                56.     8. Repay the debt to shareholders/ limited
          Perusahaan terbatas sebelum bank melunasi                            company’s debt before the bank repays the
          utangnya terlebih dahulu.                                            debt in advance.

       Berdasarkan surat No. MKT/EXT/063/III/2022 tanggal                   Based on letter No. MKT/EXT/063/III/2022
       30 Maret 2022, WBP memperoleh fasilitas kredit dari                  dated March 30, 2022, WBP obtained credit
       CTBC berupa kredit modal kerja sebesar                               facility from CTBC in the form of working capital
       Rp285.000.000.000 dengan jangka waktu jatuh                          loan amounting to Rp285,000,000,000, with
       tempo sampai dengan tanggal 31 Desember 2022                         maturity period until December 31, 2022 with an
       dengan suku bunga JIBOR+4% per tahun atau                            interest rate of JIBOR+4% per annum or
       minimal 10% per tahun (Catatan 23).                                  minimum 10% per annum (Notes 23).


       Berdasarkan Perjanjian Perdamaian dalam PKPU                         Based on the Reconciliation Agreement in
       fasilitas pinjaman ini direstrukturisasi menjadi Utang               PKPU this loan facility was restructured into
       Bank Jangka Panjang. Pada tanggal 30 Juni 2023                       Long-Term Bank Loans. As of June 30, 2023
       dan 31 Desember 2022, saldo pinjaman jangka                          and December 31, 2022, the balance of lon-term
       panjang WBP kepada PT Bank CTBC Indonesia                            loan of WBP to PT Bank CTBC Indonesia
       masing-masing sebesar Rp117.328.657.904 dan                          amounting   to    Rp117,328,657,904        and
       Rp115.644.797.398.                                                   Rp115,644,797,398, respectively.

       Pinjaman CTBC akan jatuh tempo pada tahun ke 17                      CTBC loans will be due on the 17th year from
       sejak Tanggal Efektif.                                               Effective Date.

   4. PT Bank BCA Syariah                                                 4. PT Bank BCA Syariah

       Berdasarkan surat No. 0285/PRBH-BCAS/III/2022                        Based on letter No. 0285/PRBH-BCAS/III/2022
       tanggal 23 Maret 2022 terkait Perubahan Akad                         dated         March     23,     2022    regarding
       Pembiayaan Musyarakah, WBP memperoleh fasilitas                      the Amendment to Musyarakah Financing
       kredit dari PT Bank BCA Syariah berupa                               Agreement, WBP obtained a credit facility from
       PMK       Musyarakah      (Revolving),     sebesar                   PT Bank BCA Syariah in the form of PMK
       Rp100.000.000.000, dengan jangka waktu pinjaman                      Musyarakah         (Revolving),    amounting   to
       sampai dengan tanggal 6 Juni 2022. Sampai dengan                     Rp100,000,000,000, with a loan term of up to
       tanggal pelaporan, pinjaman ini masih dalam proses                   June 6 2022. As of the reporting date, this loan
       perpanjangan.                                                        is still in the process of being renewed.

       Fasilitas ini dijaminkan dengan Piutang Usaha senilai                This loan facility is secured with account
       Rp120.000.000.000.                                                   receivable amounting to Rp120,000,000,000.


                                                            183
Page 187
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

       Pembatasan:                                                      Negative Covenant:
       WBP sebelum atau sesudah pinjaman diberikan oleh                 WBP before or after the facility provided by
       bank, juga mempunyai utang kepada pihak ketiga dan               the bank, having loan to the third party that not
       hal yang demikian tidak diberitahukan kepada bank.               inform to the bank.

       Berdasarkan Perjanjian Perdamaian dalam PKPU                      Based on the Reconciliation Agreement in
       fasilitas pinjaman ini direstrukturisasi menjadi Utang            PKPU this loan facility was restructured into
       Bank Jangka Panjang. Pada tanggal 30 Juni 2023                    Long-Term Bank Loans. As of June 30, 2023
       dan 31 Desember 2022, saldo pinjaman jangka                       and December 31, 2022, the balance of long –
       panjang WBP kepada PT Bank BCA Syariah masing-                    term loan of WBP to PT Bank BCA Syariah
       masing        sebesar      Rp47.170.581.240        and            amounting    to    Rp47,170,581,240      and
       Rp39.073.560.073.                                                 Rp39,073,560,073, respectively.

       Pinjaman PT Bank BCA Syariah akan jatuh tempo                     PT Bank BCA Syariah loans will be due on the
       pada tahun ke 17 sejak Tanggal Efektif.                           17th year from Effective Date.

   5. PT Bank ICBC Indonesia                                         5. PT Bank ICBC Indonesia

       Berdasarkan Perjanjian Kredit No. 152/LOD-                        Based on the Credit Agreement No. 152/LOD-
       CBII/XII/2021 tanggal 10 Desember 2021, WBP                       CBII/XII/2021 dated December 10, 2021, WBP
       mendapatkan kredit modal kerja dari PT Bank ICBC                  obtained a working capital loan from PT Bank
       Indonesia dengan jumlah fasilitas sebesar                         ICBC Indonesia with total facility amounting to
       Rp73.523.809.678, jangka waktu pinjaman sampai                    Rp73.523.809.678, with loan period until March
       dengan 31 Maret 2022 dengan suku bunga sebesar                    31, 2022 and the interest rate amounting to
       9,75% per tahun (Catatan 23).                                     9.75% per annum (Notes 23).

       Fasilitas pinjaman ini dijamin dengan:                            This loan facility is collateralized by:

       1.    Piutang usaha WBP yang diikat secara fidusia                1.      Trade accounts receivable of WBP bound
                                                                                 under fiduciary.
       2.    Sisa nilai atau omzet kontrak WBP - kontraktor              2.      Future receivables value or turnover
             harus dengan PT Waskita Karya (Persero) Tbk                         of WBP - contractors must by PT Waskita
                                                                                 Karya (Persero) Tbk.

       Pembatasan:                                                       Negative Covenant:

       Menjaminkan aset kepada pihak lain, kecuali                       Assuring assets to other parties, except when
       bilamana WBP menjaga DER pada maksimal sebesar                    WBP maintains DER at a maximum of 3x during
       3x selama periode pinjaman.                                       the loan period.

       Berdasarkan Perjanjian Perdamaian dalam PKPU                      Based on the Reconciliation Agreement in
       fasilitas pinjaman ini direklasifikasi menjadi Utang              PKPU this loan facility was restructured into
       Bank Jangka Panjang. Pinjaman ICBC akan jatuh                     Long-Term Bank Loans. ICBC Loans will mature
       tempo pada tahun ke 17 sejak tanggal Perjanjian                   in the 17th year from the Date of the
       Perdamaian Berkekuatan Hukum Tetap. Pada                          Reconciliation Agreement with Permanent Legal
       tanggal 30 Juni 2023 dan 31 Desember 2022, saldo                  Force. As of June 30, 2023 and December 31,
       pinjaman WBP kepada PT Bank ICBC Indonesia                        2022, the balance of loan of WBP to PT Bank
       masing-masing sebesar Rp29.281.679.817 dan                        ICBC        Indonesia       amounting      to
       Rp28.955.346.560.                                                 Rp29.281.679.817 and Rp28,955,346,560,
                                                                         respectively.




                                                          184
Page 188
                                                                      The original consolidated financial statements included herein are in
                                                                                                                 the Indonesian language.


 PT WASKITA KARYA (PERSERO) TBK                                                PT WASKITA KARYA (PERSERO) TBK
 DAN ENTITAS ANAK                                                                          AND ITS SUBSIDIARIES
 CATATAN ATAS LAPORAN KEUANGAN                                            NOTES TO THE INTERIM CONSOLIDATED
 KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                      FINANCIAL STATEMENTS AS OF JUNE 30, 2023
 31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                             AND DECEMBER 31, 2022 AND FOR THE SIX
 ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                    MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
 (2022 – DIAUDIT) – Lanjutan                                                        (2022 – AUDITED) – Continued
 (Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)            (Expressed in full Rupiah amount, unless otherwise stated)

32. UTANG VENTURA BERSAMA JANGKA PANJANG                           32. LONG-TERM JOINT VENTURES PAYABLES
                                                                                            30 Juni/                31 Desember/
                                                                                         June 30, 2023            December 31, 2022
                                                                                              Rp                         Rp
      Ventura Bersama/ Joint Ventures                                                       974.810.132.968           1.001.768.560.417
      Jumlah/ Total                                                                         974.810.132.968           1.001.768.560.417


    Akun ini merupakan penerimaan termin dari ventura                 This account represents the accounts receivables
    bersama yang diterima oleh Perusahaan dan akan                    collection that is received by the Company and will be
    diperhitungkan pada saat penutupan kerjasama operasi              settled at the end of those joint operations.
    tersebut.

33. UTANG LAIN-LAIN JANGKA PANJANG                                 33. OTHER LONG-TERM PAYABLES

                                                                                          30 Juni/                    31 Desember/
                                                                                       June 30, 2023                December 31, 2022
                                                                                            Rp                             Rp

       Pihak Ketiga/ Third Parties
        Kementerian Pekerjaan Umum dan Perumahan Rakyat/
         The Ministry of Public Works and Housing                                         1.298.326.622.311              1.301.716.023.789
        Provisi Pelapisan Jalan Tol/ Provision For Overlay                                  285.646.557.914                242.420.946.927
        Lain-lain/ Others                                                                    31.757.734.620                 13.746.456.965
       Jumlah/ Total                                                                      1.615.730.914.845              1.557.883.427.681


    Utang lain-lain kepada Kementerian Pekerjaan Umum                  Other payables to the Ministry of Public Works and
    dan Perumahahan Rakyat merupakan:                                  Housing represent:

    1. PT TJT                                                           1. PT TJT

        PT     TJT      telah   menerima   pinjaman   dari                  PT TJT has received borrowing from
        Kementerian Pekerjaan Umum dan Perumahan                            the Ministry of Public Work and Housing,
        Rakyat Bidang Pendanaan Kementerian Pekerjaan                       Financing Section of the Ministry of Public Work.
        Umum. Pinjaman tersebut digunakan sebagai uang                      The borrowing is used as compensation of land
        ganti rugi pembelian tanah Jalan Tol Ciawi –                        acquisition for Ciawi – Sukabumi Toll Road.
        Sukabumi. Pinjaman ini dikenakan bunga LPS +1%                      The loan bears interest at LPS +1% per annum
        per tahun dan akan jatuh tempo pada kondisi yang                    and will due when the land acquisition is
        lebih dahulu dicapai yaitu pada saat lahan selesai                  completed or the toll road has been operated,
        atau jalan tol telah dioperasikan.                                  whichever is earlier.

    2. PT PBTR                                                          2. PT PBTR
       Berdasarkan Akta Notaris No. 3 tanggal 8 Mei 2013                   Based on Notarial Deed No. 3 dated May 8,
       oleh Trie Sulistiowarni, S.H., Notaris di Jakarta, PBTR             2013 by Trie Sulistiowarni, S.H., Notary in
       memperoleh fasilitas pinjaman dari Kementerian                      Jakarta, PBTR received loan facility from
       Pekerjaan Umum dan Perumahan Rakyat yang                            Ministry of Public Work and Public Housing
       diwakili oleh Badan Layanan Umum (“BLU”) Badan                      represented by Badan Layanan Umum (“BLU”)
       Pengatur Jalan Tol Bidang Pendanaan Departemen                      - Toll Road Regulatory Agency Financing
       Pekerjaan Umum dan Perumahan Rakyat untuk                           Section of Ministry of Public Work and Public
       keperluan uang ganti rugi pembelian lahan Jalan Tol                 Housing used as compensation of land
       Pemalang - Batang dengan nilai maksimum pinjaman                    acquisition for Pemalang - Batang toll road with
       sebesar Rp180.168.000.000 dan dikenakan suku                        maximum            loan        amounted        to
       bunga sebesar LPS + 1% dan akan jatuh tempo pada                    Rp180,168,000,000 and beared interest of LPS
       akhir tahun 2018. Sampai dengan tanggal laporan                     + 1% and will be mature at the end of 2018. Up
       audit, perusahaan masih menunggu surat dari BLU                     to the date of this audit report, the company still
       terkait tanggal jatuh tempo pelunasan pokok                         awaiting a letter from BLU regarding the due
       pinjaman yaitu paling lambat enam bulan sejak surat                 date of repayment principal which is no later
       diterima PBTR.                                                      than six months since the PBTR received
                                                                           the letter.




                                                             185
Page 189
                                                                                      The original consolidated financial statements included herein are in
                                                                                                                                 the Indonesian language.


 PT WASKITA KARYA (PERSERO) TBK                                                              PT WASKITA KARYA (PERSERO) TBK
 DAN ENTITAS ANAK                                                                                        AND ITS SUBSIDIARIES
 CATATAN ATAS LAPORAN KEUANGAN                                                          NOTES TO THE INTERIM CONSOLIDATED
 KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
 31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                           AND DECEMBER 31, 2022 AND FOR THE SIX
 ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
 (2022 – DIAUDIT) – Lanjutan                                                                      (2022 – AUDITED) – Continued
 (Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                            (Expressed in full Rupiah amount, unless otherwise stated)

         Provisi pelapisan jalan tol merupakan beban akrual                                  Provision for Toll Road Overlay represents
         pelapisan jalan tol yang dicadangkan secara berkala                                 accruals for the cost of toll road overlay that is
         berdasarkan estimasi penggunaan jalan tol oleh                                      periodically provided based on estimated
         pelanggan.                                                                          utilization of toll road by customers.

34. UANG MUKA KONTRAK JANGKA PANJANG                                              34. ADVANCES ON LONG-TERM CONTRACTS

    Rincian saldo uang muka kontrak jangka panjang                                     The details of outstanding advances on long-term
    sebagai berikut:                                                                   contract were as follows:

                                                                                                              30 Juni/              31 Desember/
                                                                                                           June 30, 2023          December 31, 2022
                                                                                                                Rp                       Rp
      Pihak Berelasi/ Related Parties
       PT Pelabuhan Indonesia III (Persero)                                                                    21.666.000.000            36.110.000.000
       Lain-lain/ Others (di bawah/ below Rp 20 Milyar/ Billion )                                               4.194.136.407             6.415.879.475
      Sub Jumlah/ Sub Total                                                                                    25.860.136.407            42.525.879.475
      Pihak Ketiga/ Third Parties
       Kementerian Pekerjaan Umum dan Perumahan Rakyat/
        The Ministry of Public Works and Housing                                                              336.892.807.469           305.859.599.090
       The Special Administrative Region of Oenuno- Timor Leste                                               150.643.499.302            78.654.999.716
       PT Duta Graha Karya                                                                                     93.115.802.806            97.588.025.263
       Tokyu Construction Co Ltd                                                                               23.915.407.706            35.782.302.706
       Pemerintah Daerah/ District Governments                                                                  5.480.033.985            85.638.964.026
       Lain-lain/ Others (di bawah/ below Rp 20 Milyar/ Billion )                                              10.772.165.924            42.590.221.995
      Sub Jumlah/ Sub Total                                                                                   620.819.717.192           646.114.112.796
      Jumlah/ Total                                                                                           646.679.853.599           688.639.992.271


35. LIABILITAS SEWA GUNA USAHA                                                    35. LEASE LIABILITIES
                                                               30 Juni/            31 Desember/
                                                            June 30, 2023        December 31, 2022
                                                                 Rp                     Rp

   Liabilitas Guna Usaha                                                                                                                Leased Liabilities
    Tanah                                                        4.797.480.939          3.990.456.100                                                Land
    Bangunan                                                       261.295.224            188.679.330                                            Building
    Kendaraan                                                  24.886.395.225         34.231.761.120                                             Vehicles
   Dikurangi: Bagian Lancar                                    (5.574.946.312)        (5.947.090.064)                                 Less: Current Portion
   Jumlah Harga Perolehan                                      24.370.225.076         32.463.806.486                                Total Acquisition Cost


    Liabilitas sewa guna usaha Perusahaan dijamin dengan                               The Group’s lease liabilities are secured by
    aset sewaan milik penyewa.                                                         the lessor’s leased assets.

36. LIABILITAS IMBALAN KERJA                                                      36. EMPLOYEE BENEFIT LIABILITIES

    Rincian kewajiban imbalan pasca kerja sesuai UU                                    The details of post-employment benefits under
    Ketenagakerjaan No. 13/2003 dan kewajiban manfaat                                  Labor Law No 13/2003 and other long-term benefit
    jangka panjang lainnya berdasarkan entitas yang                                    based on its entities that is presented in consolidated
    disajikan dalam laporan keuangan konsolidasian adalah                              statements of financial position are as follows:
    sebagai berikut:
                                                                                                           30 Juni/                31 Desember/
                                                                                                        June 30, 2023            December 31, 2022
                                                                                                             Rp                         Rp

   Perusahaan/ the Company                                                                                   17.731.402.606              17.731.402.606
   Entitas Anak/ Subsidiaries
    PT Waskita Beton Precast Tbk                                                                             17.372.141.941              17.372.141.941
    PT Trans Jabar Tol                                                                                        2.226.174.075               2.226.174.075
    PT Waskita Toll Road                                                                                      2.184.316.596               2.184.316.596
    PT Waskita Karya Realty                                                                                   1.163.824.181               1.163.824.181
   Jumlah/ Total                                                                                             40.677.859.399              40.677.859.399




                                                                        186
Page 190
                                                                               The original consolidated financial statements included herein are in
                                                                                                                          the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                        PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                                  AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                    NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                              FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                     AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                            MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                                (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                     (Expressed in full Rupiah amount, unless otherwise stated)

   Program Pensiun Iuran Pasti                                                  Defined Benefit Plans

   Perusahaan menyelenggarakan program pensiun                                  The Company provides a defined benefit and other
   imbalan pasti dan imbalan kerja jangka panjang lainnya                       long-terms benefit covering all the qualified
   untuk semua karyawan yang memenuhi persyaratan.                              employees.

   Nilai kewajiban yang termasuk dalam laporan posisi                           The      amount    of   liabilities included     in
   keuangan konsolidasian dari manfaat pasca-kerja di                           the consolidated statements of financial position
   bawah UU Ketenagakerjaan No. 13/2003 dan kewajiban                           arising from post employment benefits under Labor
   manfaat jangka panjang lainnya adalah sebagai berikut:                       Law No. 13/2003 and other long-term benefit are as
                                                                                follows:

                                                        30 Juni/            31 Desember/
                                                     June 30, 2023        December 31, 2022
                                                          Rp                     Rp
  Imbalan pascakerja sesuai                                                                                             Post-employment benefits under
    UU Ketenagakerjaan No.13/2003                                    --                     --                                 Labor Law No. 13/2003
  Manfaat jangka panjang lainnya                        17.731.402.606         17.731.402.606                                   Other long-term benefit
  Nilai Kini Kewajiban Imbalan Kerja - Akhir            17.731.402.606         17.731.402.606                 Present Value Benefit Obligation - Ending


   Dana pensiun ini dikelola oleh PT Asuransi Jiwasraya                         The pension plan is managed by PT Asuransi
   (Persero) yang akta pendiriannya telah disahkan oleh                         Jiwasraya (Persero), the deed of establishment of
   Menteri Keuangan Republik Indonesia dengan                                   which was approved by the Minister of Finance of
   KEP-84/MK/IV/2/1973 tanggal 28 Februari 1973. Pada                           the Republic of Indonesia in his decision letter KEP-
   tahun 2006, Perusahaan menandatangani perjanjian                             84/MK/IV/2/1973 dated February 28, 1973. In 2006,
   kerja   sama     No.    WK:     L.20/P/WK/2006   dan                         the Company signed a cooperation agreement No.
   No. AJS: 079.SJ.U.076 tanggal 28 Juli 2006 tentang                           WK:L.20/P/WK/2006 and No. AJS: 079.SJ.U.076
   Pengelolaan Program Asuransi Pesangon Kumpulan dan                           dated July 28, 2006 concerning to Management of
   Addendum I Perjanjian Kerjasama No. L.20/P/WK/2006;                          Severance Group Insurance Program and
   No. 079 SJ. U. 0706 tanggal 25 April 2008.                                   Addendum        I  to   Cooperation       Agreement
                                                                                No. L.20/P/WK/2006; No. 079 SJ. U. 0706 dated
                                                                                April 25, 2008.

   a. Program Imbalan Pasca Kerja                                                a. Post-employment Benefit Plan

        Imbalan kerja memberikan eksposur Perusahaan                                  Employee benefit typically exposes the
        terhadap risiko aktuarial seperti risiko investasi, risiko                    Company to actuarial risks such as investment
        tingkat bunga, risiko harapan hidup dan risiko gaji.                          risk, interest rate risk, longevity risk and salary
                                                                                      risk.

        Risiko Investasi                                                              Investment risk

        Nilai kini kewajiban imbalan pasti dihitung                                   The present value of the defined benefit plan
        menggunakan tingkat diskonto yang ditetapkan                                  liability is calculated using a discount rate
        dengan mengacu pada imbal hasil obligasi korporasi                            determined by reference to high quality
        berkualitas tinggi; jika pengembalian aset program di                         corporate bond yields; if the return on plan asset
        bawah tingkat tersebut, hal itu akan mengakibatkan                            is below this rate, it will create a plan deficit.
        defisit program. Saat ini program tersebut memiliki                           Currently, the plan has a relatively balanced
        investasi yang relatif seimbang pada efek ekuitas,                            investment in equity securities, debt instruments
        instrumen utang dan real estate. Karena sifat jangka                          and real estates. Due to the long-term nature of
        panjang dari liabilitas program, dewan dana pensiun                           the plan liabilities, the board of the pension fund
        perlu menetapkan bahwa bagian wajar dari aset                                 considers it appropriate that a reasonable
        program harus diinvestasikan pada efek ekuitas dan                            portion of the plan assets should be invested in
        real estate untuk meningkatkan imbal hasil yang                               equity securities and in real estate to leverage
        dihasilkan oleh dana.                                                         the return generated by the fund.

        Risiko Tingkat Bunga                                                          Interest Risk

        Penurunan suku bunga obligasi akan meningkatkan                               A decrease in the bond interest rate will increase
        liabilitas program; namun, sebagian akan saling                               the plan liability; however, this will be partially
        hapus oleh peningkatan imbal hasil atas investasi                             offset by an increase in the return on the plan’s
        instrumen utang.                                                              debt investments.


                                                                187
Page 191
                                                                             The original consolidated financial statements included herein are in
                                                                                                                        the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                        PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                                  AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                    NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                              FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                     AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                            MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                                (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                    (Expressed in full Rupiah amount, unless otherwise stated)

       Risiko Harapan Hidup                                                        Longevity risk

       Nilai kini kewajiban imbalan pasti dihitung dengan                          The present value of the defined benefit plan
       mengacu pada estimasi terbaik dari mortalitas                               liability is calculated by reference to the best
       peserta program baik selama dan setelah kontrak                             estimate of the mortality of plan participants both
       kerja. Peningkatan harapan hidup peserta program                            during and after their employment. An increase
       akan meningkatkan liabilitas program.                                       in the life expectancy of the plan participants will
                                                                                   increase the plan’s liability.

       Risiko Gaji                                                                 Salary Risk

       Nilai kini kewajiban imbalan pasti dihitung dengan                          The present value of the defined benefit plan
       mengacu pada gaji masa depan peserta program.                               liability is calculated by reference to the future
       Dengan demikian, kenaikan gaji peserta program                              salaries of plan participants. As such, an
       akan meningkatkan liabilitas program itu.                                   increase in the salary of the plan participants will
                                                                                   increase the plan’s liability.

       Perusahaan menyelenggarakan program pensiun                                 The Company established defined benefit
       imbalan pasti mencakup semua karyawan tetap lokal.                          pension plan covering all the local permanent
       Program      ini memberikan     imbalan pensiun                             employees. This plan provides pension benefits
       berdasarkan penghasilan dasar pensiun dan masa                              based on years of service and salaries of
       kerja karyawan. Perusahaan telah membukukan                                 the employees. The Company has recorded
       liabilitas manfaat karyawan sesuai dengan Undang-                           liabilities of employee benefits in accordance
       Undang       No.    13    Tahun    2003    tentang                          with Law No. 13 Year 2003 regarding to
       Ketenagakerjaan, menggunakan teknik aktuarial,                              pertaining to man power, using actuarial
       dalam rangka penerapan PSAK No. 24 (Revisi 2013)                            techniques, within the framework of the
       tentang Imbalan Kerja.                                                      implementation of Indonesian PSAK No. 24
                                                                                   (Revised 2013) of Employee Benefits.

       Liabilitas   imbalan    pasca-kerja    Perusahaan                           The amounts included in the statement of
       sehubungan dengan program pensiun yang termasuk                             financial position arising from the Company’s
       dalam laporan posisi keuangan konsolidasian adalah                          obligation in respect of the defined benefits plan
       sebagai berikut:                                                            is as follows:

                                                       30 Juni/              31 Desember/
                                                    June 30, 2023          December 31, 2022
                                                         Rp                       Rp

      Nilai Kini Kewajiban                           247.722.505.129          247.722.505.129                         Present Value of Obligations
      Nilai Wajar Aset Program                      (315.211.030.360)        (315.211.030.360)                           Fair Value of Plan Assets
      Dampak Pembatasan Aset                          67.488.525.231           67.488.525.231                           Impact of Asset Restriction

      Liabilitas Bersih yang Timbul                                                                                      Net Liability Arising from
       dari Kewajiban Imbalan Pasti                                  --                        --                    Defined Benefits Obligation


       Mutasi nilai kini liabilitas imbalan pasti adalah sebagai                   Movements in the present value of
       berikut:                                                                    the defined benefit liabilities were as follows:

                                                        30 Juni/              31 Desember/
                                                     June 30, 2023          December 31, 2022
                                                          Rp                       Rp
        Saldo Awal Nilai Kini Liabilitas               272.527.301.107          272.527.301.107                                  Beginning Balance
        Biaya Jasa Kini                                  19.792.584.872           19.792.584.872                               Current Service Cost
        Biaya Bunga                                      18.976.258.471           18.976.258.471                                        Interest Cost
        (Keuntungan) Kerugian Kurtailment               (8.977.415.258)          (8.977.415.258)                       (Gain) Loss from Curtailment
        Imbalan yang Dibayarkan                        (43.647.064.081)         (43.647.064.081)                                  Benefits Payment
        Pengukuran Kembali Liabilitas (Aset)                                                                     Remeasurement on the Net Defined
         Imbalan Pasti Neto:                                                                                                Benefit (Asset) Liability:
         (Keuntungan) Kerugian Aktuarial yang                                                                      Actuarial (Gains)/Losses Arising
          Timbul dari Penyesuaian Pengalaman           (10.949.159.982)         (10.949.159.982)                     from Experience Adjustment
        Saldo Akhir Nilai Kini Liabilitas              247.722.505.129          247.722.505.129       Ending Balance of Present Value Obligation




                                                             188
Page 192
                                                                                 The original consolidated financial statements included herein are in
                                                                                                                            the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                            PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                                      AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                                  FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                         AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                                MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                                    (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                        (Expressed in full Rupiah amount, unless otherwise stated)

        Mutasi nilai wajar dari aset program adalah sebagai                             Movements in the fair value of the plan assets
        berikut:                                                                        were as follows:

                                                             30 Juni/           31 Desember/
                                                          June 30, 2023       December 31, 2022
                                                               Rp                    Rp

       Nilai wajar aset program- awal                      311.705.859.874        311.705.859.874                     Opening fair value of plan assets
       Pengukuran kembali keuntungan (kerugian):                                                                          Remeasurement gain (loss):
        Imbal hasil aset program (tidak termasuk jumlah                                                     Return
                                                                                                            Return on
                                                                                                                   on plan
                                                                                                                      plan assets
                                                                                                                            assets (excluding
                                                                                                                                   (excluding amounts
                                                                                                                                               amounts
        yang dimasukkan dalam beban bunga neto)              23.596.133.592         23.596.133.592                   included in net interest expense)
       (Kerugian) Aktuarial atas Aset Program              (20.090.963.106)       (20.090.963.106)                Actuarial (Loss) on Assets Programs
       Nilai Wajar Aset Program - Akhir                    315.211.030.360        315.211.030.360          Closing Fair Value of Plan Assets - Ending


        Asumsi aktuarial yang signifikan untuk penentuan                                Significant    actuarial    assumptions       for
        kewajiban imbalan pasti adalah tingkat diskonto,                                the determination of the defined obligation are
        kenaikan gaji yang diharapkan dan mortalitas.                                   discount rates expected salary increase and
        Sensitivitas analisis di bawah ini ditentukan                                   mortality. The sensitivity analysis below have
        berdasarkan masing-masing perubahan asumsi yang                                 been determined based on reasonably possible
        mungkin terjadi pada akhir periode pelaporan,                                   changes of the respective assumptions
        dengan semua asumsi lain konstan.                                               occurring at the end of the reporting period,
                                                                                        while holding all other assumptions constant.

        Berikut adalah analisa sensitivitas atas asumsi                                 The followings is the sensitivity analysis of
        signifikan yang mempengaruhi nilai kini kewajiban                               significant assumptions that affect the present
        dan biaya jasa kini:                                                            value of obligations and current service costs:

                                                                                           Nilai Kini Kewajiban/
                                                                                            Present Value of                Biaya Jasa Kini/
                                                                                                 Obligation               Current Service Cost

          31 Desember/ December 31, 2022:
          Perubahan Tingkat Diskonto/
           Changes in Discounted Rate
          Naik Menjadi/ Increase to 8,54%                                                            235.975.126.899                 18.217.677.911
          Tingkat Diskonto/ Discounted Rate 7,40%                                                    247.722.505.129                 19.792.584.872
          Turun Menjadi/ Decrease to 6,54%                                                           260.883.138.891                 21.628.344.788
          Perubahan Tingkat Kenaikan Upah/
           Changes in Wages Rate
          Naik Menjadi/ Increase to 6,00%                                                            260.014.099.930                 21.568.583.767
          Tingkat Kenaikan Upah/ Wages Increase Rate 5,00%                                           247.722.505.129                 19.792.584.872
          Turun Menjadi/ Decrease to 4,00 %                                                          236.576.479.952                 18.242.267.629


        Durasi rata-rata dari kewajiban imbalan pada                               , The average duration of the benefit obligation at
        31 Desember 2022 adalah 18,29 tahun.                                       d December 31, 2022is 18.29 years.

  b.    Manfaat Jangka Panjang Lainnya                                             b. Other Long-term Benefits                  c.

        Perusahaan juga menyediakan manfaat cuti besar                                  The Company also provides long service leaves
        untuk karyawan yang telah bekerja selama 6 tahun                                to the employee who have already rendered 6
        dalam bentuk satu kali gaji.                                                    years of service in the form of cash amounting
                                                                                        to one month salary.

        Mutasi nilai kini manfaat jangka panjang lainnya                                Movements in the present value of other long-
        adalah sebagai berikut:                                                         term benefits were as follows:




                                                                    189
Page 193
                                                                                   The original consolidated financial statements included herein are in
                                                                                                                              the Indonesian language.


 PT WASKITA KARYA (PERSERO) TBK                                                          PT WASKITA KARYA (PERSERO) TBK
 DAN ENTITAS ANAK                                                                                    AND ITS SUBSIDIARIES
 CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO THE INTERIM CONSOLIDATED
 KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                                FINANCIAL STATEMENTS AS OF JUNE 30, 2023
 31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                       AND DECEMBER 31, 2022 AND FOR THE SIX
 ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                              MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
 (2022 – DIAUDIT) – Lanjutan                                                                  (2022 – AUDITED) – Continued
 (Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                         (Expressed in full Rupiah amount, unless otherwise stated)

                                                              30 Juni/             31 Desember/
                                                           June 30, 2023         December 31, 2022
                                                                Rp                      Rp
         Saldo Awal Nilai Kewajiban Manfaat                                                                                Beginning Balance Long-Term
          Jangka Panjang Lainnya                              19.193.098.311           19.193.098.311                                 Benefits Obligation
         Biaya Jasa Kini                                       2.131.146.683            2.131.146.683                                Current Service Cost
         Biaya Bunga                                           1.449.390.379            1.449.390.379                                        Interest Cost
         Imbalan Kerja yang Sudah Tercatat                                                                                  Recorded Employee Benefits
          Bagi Pegawai Keluar                                 (6.013.429.640)          (6.013.429.640)                          for Outgoing Employees
         (Keuntungan) Kerugian Kurtailmen                         971.196.873              971.196.873                      (Gain) Loss from Curtailment
         Saldo Akhir Nilai Kewajiban Manfaat                                                                                 Ending Balance Long-Term
          Jangka Panjang Lainnya                              17.731.402.606           17.731.402.606                              Benefits Obligation


        Perhitungan imbalan pasca-kerja dihitung oleh                                      The cost of providing post-employment benefits
        aktuaris independen PT Praptasentosa Gunajasa.                                     is calculated by independent actuary,
        Asumsi akuarial pada tanggal 30 Juni 2023 dan                                      PT    Praptasentosa      Gunajasa.   Actuarial
        31 Desember 2022 sebagai berikut:                                                  assumptions as of June 30, 2023 and December
                                                                                           31, 2022 are as follows:

                                                            30 Juni/              31 Desember/
                                                         June 30, 2023          December 31, 2022

       Tingkat Diskonto                                     7,40%                     7,40%                                               Discount Rate
       Tingkat Kenaikan Gaji                                5,00%                     5,00%                               Annual Salary Increasing Rate
       Tingkat Mortalitas                                 TMI IV 2019               TMI IV 2019                                           Mortality Rate
       Tingkat Cacat                                  5,00% of TMI IV 2019      5,00% of TMI IV 2019                                     Disability Rate
       Umur Pensiun Normal (tahun)                             56                        56                               Normal Retirement Age (years)


37. MODAL SAHAM                                                                 37. SHARE CAPITAL

    a. Modal Saham                                                                   a. Share Capital

       Sesuai daftar pemegang saham yang dikeluarkan oleh                                  According to the shareholders list from Biro
       Biro Administrasi Efek, PT Datindo Entrycom, susunan                                Adminstrasi Efek, PT Datindo Entrycom,
       pemegang saham Perusahaan adalah sebagai                                            the composition of the Company’s capital were
       berikut:                                                                            as follows:

                                                                  30 Juni/ June 30, 2023
                                                             31 Desember/ December 31, 2022
                                                                        Persentase          Jumlah Modal
                                                                       Kepemilikan/           Disetor/
                                               Jumlah Saham/          Percentage of         Total Paid In
                                                Total Shares            Ownership             Capital
      Modal Dasar                                 54.295.804.000                               5.429.580.400.000                          Authorized Capital

      Modal Ditempatkan dan Disetor Penuh:                                                                                Subscribed and Fully Paid Capital:
       Saham Preferen (Seri A Dwiwarna)                                                                                 Preferred Stock (Dwi Warna Serie A)
        Pemerintah Republik Indonesia                          1                   0,00%                    100       Government of Republic of Indonesia
       Saham Biasa (Seri B)                                                                                                        Common Stock (Serie B)
        Pemerintah Republik Indonesia              21.705.633.361                 75,35%       2.170.563.336.100      Government of Republic of Indonesia
       Masyarakat (kepemilikan <0,5%)               7.101.173.654                 24,65%         710.117.365.400                Public (each holding <0.5%)
      Jumlah Modal Ditempatkan                                                                                                                  Total Issued
       dan Disetor Penuh                           28.806.807.016                100,00%       2.880.680.701.600                            and Fully Paid


        Dibawah ini merupakan Akta Notaris terkait modal                                   Below are the Notarial Deed related to share
        saham:                                                                             capital:

        •    Berdasarkan      Akta     No.     46     tanggal                              •   Based on the Deed No. 46 dated May 26,
             26 Mei 2015 oleh Fathiah Helmi, S.H., Notaris di                                  2015 of Fathiah Helmi, S.H., Notary in
             Jakarta,    pemegang       saham      menyetujui                                  Jakarta, the Company’s shareholders
             peningkatan modal disetor sebanyak 186.471.154                                    approved the increase in the Company’s to
             lembar. Modal disetor semula 9.727.504.205                                        186,471,154 shares. Paid up capital
             lembar atau setara dengan Rp972.750.420.500                                       from     9,727,504,205       shares    or
             menjadi 9.913.975.359 lembar atau setara                                          Rp972,750,420,500     to    9,913,975,359
             Rp991.397.535.900. Perubahan tersebut telah                                       shares or Rp991,397,535,900. This change
             disahkan oleh Kementerian Hukum dan Hak Asasi                                     has been approved by the Ministry of Law
             Manusia No. AHU-AH.01.03/0934821 tanggal 26                                       and     Human      Rights     No.   AHU-
             Mei 2015. Berdasarkan Akta No. 37 tanggal                                         AH.01.03/0934821 dated May, 26, 2015.
             30 Juli 2015 dari Fathiah Helmi, S.H., Notaris di                                 Based on the Deed No. 37 from dated

                                                                    190
Page 194
                                                                     The original consolidated financial statements included herein are in
                                                                                                                the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                          AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                      FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                             AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                    MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                        (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)            (Expressed in full Rupiah amount, unless otherwise stated)

           Jakarta, terdapat penambahan jumlah modal                            July 30, 2015 Notary Fathiah Helmi, S.H.,
           disetor sebanyak 3.653.498 lembar, semula                            Notary in Jakarta, there was an
           9.913.975.360       lembar    atau      setara                       increasing number of paid-in capital
           Rp991.397.536.000 menjadi 13.567.473.559                             as    much      as   3,653,498    shares,
           lembar atau setara dengan Rp1.356.747.356.000                        paid up capital from 9,913,975,360
           Perubahan tersebut disahkan oleh Kementerian                         shares or Rp991,397,536,000 become
           Hukum dan Hak Asasi Manusia No. AHU-                                 13,567,473,559          shares         or
           3536245.AH.01.11 tanggal 30 Juli 2015.                               Rp1,356,747,356,000. This change has
                                                                                been approved by the Ministry of Law and
                                                                                Human Rights No. AHU-3536245.AH.01.11
                                                                                dated July 30, 2015.

       •   Berdasarkan Akta Keputusan Rapat Pemegang                       •    Based on the Deed No. 6 of General
           Saham No. 6 tanggal 4 Februari 2016 dari Fathiah                     Shareholders Meeting dated February 4,
           Helmi, S.H., Notaris di Jakarta, pemegang saham                      2016 from Fathiah Helmi, S.H., Notary in
           menyetujui penambahan jumlah modal disetor                           Jakarta,   the shareholders       approved
           sebanyak 5.019.750 lembar saham, semula                              the increase in the Company’s paid-in capital
           13.567.473.559 lembar saham atau setara                              of 5,019,750 shares, from 13,567,473,559
           Rp1.356.747.356.000 menjadi 13.572.493.310                           shares equal to Rp1,356,747,356,000 to
           lembar saham atau setara Rp1.357.249.331.000.                        13,572,493,310       shares    equal       to
           Perubahan tersebut telah disahkan oleh                               Rp1,357,249,331,000. This change has
           Kementerian Hukum dan Hak Asasi Manusia                              been approved by the Ministry of Law and
           No. AHU-0016611-AH.01.03 tanggal 5 Februari                          Human Rights in its decree No. AHU-
           2016.                                                                0016611-AH.01.03 dated February 5, 2016.

       •   Berdasarkan Akta Keputusan Rapat Pemegang                       •    Based on the Deed No. 50 of General
           Saham No. 50 tanggal 25 November 2016 dari                           Shareholders Meeting dated November 25,
           Fathiah Helmi, S.H., Notaris di Jakarta, pemegang                    2016 from Fathiah Helmi, S.H., Notary in
           saham menyetujui penambahan modal disetor                            Jakarta,   the shareholders       approved
           sebanyak 842.439 lembar saham, semula                                the increase in the Company’s paid-in capital
           13.572.493.310 lembar saham atau setara                              of 842,439 shares, from 13,572,493,310
           dengan        Rp1.357.249.331.000          menjadi                   shares or equal to Rp1,357,249,331,000 to
           13.573.335.750 lembar saham atau setara                              13,573,335,750 shares or equal to
           dengan      Rp1.357.333.575.000.        Perubahan                    Rp1,357,333,575,000. This change has
           tersebut telah disahkan oleh Kementerian Hukum                       been approved by the Ministry of Law and
           dan Hak Asasi Manusia No. AHU-AH.01.03-                              Human Rights of the Republic of Indonesia
           0102149 tanggal 25 November 2016.                                    in its decree No. AHU-AH.01.03-0102149
                                                                                dated November 25, 2016.

       •   Sesuai dengan Akta No. 19 tahun 2018 tanggal                    -    Based on the Deed No. 19 of 2018 dated
           6 April 2018 tentang perubahan peningkatan                           April 6, 2018 regarding the Amendment of
           modal ditempatkan/disetor pasal 4 ayat 3 yang                        the Issuance of Paid-up Capital of Article 4
           telah disetujui oleh Menteri Hukum dan Hak Asasi                     paragraph 3 which has been approved by
           Manusia         dengan        Surat     Keputusan                    the Minister of Law and Human Rights in
           No. AHU-AH.01.03-0137350 Tahun 2018 tanggal                          Decision Letter No. AHU-AH.01.03-0137350
           6 April 2018 menerangkan bahwa dengan adanya                         Year 2018 date April 6, 2018 explains that
           pelaksanaan MESOP sebanyak 24.200 (Dua                               with the implementation of MESOP 24,200
           Puluh Empat Ribu Dua Ratus) saham seri B                             (Twenty Four Thousand Two Hundred) of
           masing-masing saham dengan nilai nominal                             Series B shares each with nominal value of
           sebesar Rp100,00 (seratus Rupiah) atau dengan                        Rp100.00 (one hundred Rupiah) or with a
           jumlah nilai nominal sebesar Rp2.420.000,00                          total nominal value of Rp2,420,000.00 (two
           (dua juta empat ratus dua puluh ribu rupiah) maka                    million four hundred and twenty thousand
           jumlah modal ditempatkan dan disetor Perseroan                       Rupiah), the total issued and paid up capital
           meningkat dari 13.573.878.400 (tiga belas milyar                     of    the    Company       increased     from
           lima ratus tujuh puluh tiga juta delapan ratus tujuh                 13,573,878,400 (thirteen billion five hundred
           puluh delapan ribu empat ratus) saham menjadi                        seventy three million eight hundred seventy
           13.573.902.600 (tiga belas milyar lima ratus tujuh                   eight thousand four hundred) shares to
           puluh tiga juta sembilan ratus dua ribu enam                         13,573,902,600 (thirteen billion five hundred
           ratus) saham.                                                        seventy three million nine hundred two
                                                                                thousand and six hundred) shares.

       •   Sesuai dengan Akta No. 9 tahun 2019 tanggal                     -    Based on the Deed No. 9 of 2019 dated
           8 Januari 2019 tentang perubahan peningkatan                         January 8, 2019 regarding the Amendment
           modal ditempatkan/disetor pasal 4 ayat 2 dan 3                       of the Issuance of Paid-up Capital of Article

                                                           191
Page 195
                                                                    The original consolidated financial statements included herein are in
                                                                                                               the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                               PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                         AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                           NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                     FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                            AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                   MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                       (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)           (Expressed in full Rupiah amount, unless otherwise stated)

           yang telah disetujui oleh Menteri Hukum dan Hak                     4 paragraph 2 and 3 which has been
           Asasi Manusia dengan Surat Keputusan                                approved by the Minister of Law and Human
           No. AHU-AH.01.03-0010978 tanggal 9 Januari                          Rights in Decision Letter No. AHU-
           2019 menerangkan bahwa dengan adanya                                AH.01.03-0010978 dated January 9, 2019
           pelaksanaan MESOP sebanyak 48.400 (Empat                            explains that with the implementation of
           Puluh Delapan Ribu Empat Ratus) saham seri B                        MESOP 48,400 (Fourty Eight Thousand
           masing-masing saham dengan nilai nominal                            Four Hundred) of Series B shares each with
           sebesar Rp100,00 (seratus Rupiah) atau dengan                       nominal value of Rp100.00 (one hundred
           jumlah nilai nominal sebesar Rp4.840.000,00                         Rupiah) or with a total nominal value of
           (empat juta delapan ratus empat puluh ribu                          Rp4,840,000.00 (four million eight hundred
           rupiah) maka jumlah modal ditempatkan dan                           and fourty thousand Rupiah), the total
           disetor Perseroan meningkat dari 13.573.902.600                     issued and paid up capital of the Company
           (tiga belas milyar lima ratus tujuh puluh tiga juta                 increased from 13,573,902,600 (thirteen
           sembilan ratus dua ribu enam ratus) saham                           billion five hundred seventy three million
           menjadi 13.573.951.000 (tiga belas milyar lima                      nine hundred two thousand and six hundred)
           ratus tujuh puluh tiga juta sembilan ratus lima                     shares to 13,573,951,000 (thirteen billion
           puluh satu ribu) saham.                                             five hundred seventy three million nine
                                                                               hundred fifty one thousand) shares.

       •   Berdasarkan Akta No. 11 tahun 2021 tanggal                     -    Based on Deed No. 11 of 2021 dated
           7 Oktober 2021 tentang perubahan peningkatan                        October 7, 2021 regarding changes to
           Modal Dasar Perusahaan pasal 4 ayat 1 yang                          the increase in the Company's Authorized
           telah disetujui oleh Menteri Hukum dan Hak Asasi                    Capital Article 4 paragraph 1 which has been
           Manusia         dengan       Surat    Keputusan                     approved by the Minister of Law
           No. AHU-0056001.AH.01.02 tanggal 11 Oktober                         and     Human       Rights    with   Decree
           2021 menyetujui peningkatan Modal Dasar                             No. AHU-0056001.AH.01.02 dated October
           Perseroan semula 26.000.000.000 lembar saham                        11, 2021, approved an increase in
           atau setara dengan Rp2.600.000.000.000                              the Company's Authorized Capital from
           menjadi 54.295.804.000 lembar saham atau                            26,000,000,000 shares or equal to
           setara dengan Rp5.429.580.400.000.                                  Rp2,600,000,000,000 to 54,295,804,000
                                                                               shares or equal to Rp5,429,580,400,000.

       •   Berdasarkan Akta Pernyataan Keputusan Rapat                    -    Based on the Deed of Decision of
           Pemegang Saham No. 88 tanggal 30 Desember                           the Shareholders Meeting No. 88 dated
           2021 dari Ashoya Ratam, S.H.,M.Kn., Notaris di                      December 30, 2021 from Ashoya Ratam,
           Jakarta,     pemegang      saham     menyetujui                     S.H., M.Kn., Notary in Jakarta, the
           penambahan        modal     disetor    sebanyak                     shareholders agreed to increase the paid-in
           12.741.935.475      lembar    saham,     semula                     capital of 12,741,935,475 shares, from
           13.573.951.000 lembar saham atau setara                             13,573,951,000 shares or equivalent to
           dengan        Rp1.357.395.100.000       menjadi                     Rp1,357,395,100,000 to 26,315,886,475
           26.315.886.475 lembar saham atau setara                             shares        or       equivalent        to
           dengan      Rp2.631.588.647.500.     Perubahan                      Rp2,631,588,647,500. The amendment has
           tersebut telah disahkan oleh Kementerian Hukum                      been approved by the Ministry of Law and
           dan Hak Asasi Manusia No. AHU-AH.01.03-                             Human Rights No. AHU-AH.01.03-0494676
           0494676 tanggal 31 Desember 2021.                                   dated December 31, 2021.

       •   Berdasarkan Akta No. 06 tanggal 21 Januari 2022                -    Based on Deed No. 06 dated January 21,
           dari Ashoya Ratam, S.H., M.Kn., Notaris di                          2022 from Ashoya Ratam, SH, M.Kn.,
           Jakarta, Keputusan Rapat Pemegang Saham                             Notary in Jakarta, the Resolution of
           Luar Biasa menyetujui penambahan modal                              the Extraordinary Meeting of Shareholders
           disetor dan ditempatkan sebanyak 2.490.920.541                      approved the addition of 2,490,920,541
           lembar saham Seri B yang merupakan saham                            Series B shares which are new shares
           baru hasil Hak Memesan Efek Terlebih Dahulu.                        resulting from Pre-emptive Rights. So that
           Sehingga modal ditempatkan dan disetor                              the issued and paid-up capital of the
           Perusahaan       mengalami     perubahan    dari                    Company       was   changed     from    to
           26.315.886.475 lembar saham atau setara                             26,315,886,475 shares or equivalent to
           dengan        Rp2.631.588.647.500       menjadi                     Rp2,631,588,647,500 to 28,806,807,016
           28.806.807.016 lembar saham atau setara                             shares         or      equivalent       to
           dengan      Rp2.880.680.701.600.     Perubahan                      Rp2,880,680,701,600. The amendment has
           tersebut telah disahkan oleh Kementerian Hukum                      been approved by the Ministry of Law and


                                                          192
Page 196
                                                                                                             The original consolidated financial statements included herein are in
                                                                                                                                                        the Indonesian language.


 PT WASKITA KARYA (PERSERO) TBK                                                                                     PT WASKITA KARYA (PERSERO) TBK
 DAN ENTITAS ANAK                                                                                                               AND ITS SUBSIDIARIES
 CATATAN ATAS LAPORAN KEUANGAN                                                                                 NOTES TO THE INTERIM CONSOLIDATED
 KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                                                           FINANCIAL STATEMENTS AS OF JUNE 30, 2023
 31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                                                  AND DECEMBER 31, 2022 AND FOR THE SIX
 ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                                                         MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
 (2022 – DIAUDIT) – Lanjutan                                                                                             (2022 – AUDITED) – Continued
 (Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                                                  (Expressed in full Rupiah amount, unless otherwise stated)

              dan Hak Asasi Manusia No. AHU-AH.01.03-                                                                          Human Rights No. AHU-AH.01.03-0048528
              0048528 tanggal 21 Januari 2022.                                                                                 dated January 21, 2022.

38. TAMBAHAN MODAL DISETOR                                                                              38. ADDITIONAL PAID-IN CAPITAL

                                                                                     30 Juni/             31 Desember/
                                                                                  June 30, 2023         December 31, 2022
                                                                                       Rp                      Rp
     Agio Saham                                                                                                                                                                          Premium on Share
      Tambahan modal disetor dari penawaran umum saham                                                                                                        Additional paid-in capital of a public offering
       Perusahaan kepada masyarakat sebesar 3.082.315.000                                                                                                of shares to the public at 3,082,315,000 shares
        saham dengan nilai nominal Rp 100 per saham, yang                                                                                                       with a nominal value of Rp 100 per share,
       ditawarkan Rp 380 per saham                                                  863.048.200.000         863.048.200.000                                               which offered Rp 380 per share
      Tambahan modal disetor dari eksekusi opsi saham karyawan                      118.826.375.828         118.826.375.828        Additional paid-in capital from the exercise of employee stock options
      Tambahan modal disetor dari Penawaran Umum Terbatas I (PUT I)                                                                         Additional paid-in capital of a Limited Public Offering (LOP I)
       Perusahaan kepada masyarakat sebesar 3.653.498.200 saham dengan                                                                              of shares to the public at 3,653,498,200 shares with
       nilai nominal Rp 100 per saham, yang ditawarkan Rp 1.450 per saham          4.969.551.418.508      4.969.551.418.508                    par value Rp 100 per share, offered Rp 1,450 per share
      Tambahan modal disetor dari Hak Memesan Efek Terlebih Dahulu                                                                   Additional paid-in capital of a Pre-Emptive Right share and paid up
      bagian dan disetor Negara Republik Indonesia sebesar 12.741.935.475 saham                                                      by the Republic of Indonesia amounted to 12,741,935,475 shares
        dengan nilai nominal Rp 100 per saham, yang ditawarkan Rp 620 per saham    6.625.806.447.000      6.625.806.447.000                      par value Rp 100 per share, offered Rp 620 per share
      Tambahan modal disetor dari Hak Memesan Efek Terlebih Dahulu                                                                   Additional paid-in capital of a Pre-Emptive Right share and paid up
      bagian dan disetor Masyarakat sebesar 2.490.920.541 saham                                                                       by the Republic of Indonesia amounted to 2,490,920,541 shares
        dengan nilai nominal Rp 100 per saham, yang ditawarkan Rp 620 per saham    1.295.278.681.320      1.295.278.681.320                      par value Rp 100 per share, offered Rp 620 per share
      Dikurangi dengan biaya emisi saham                                             (31.910.365.455)       (31.910.365.455)                                                    Less: Share Issuance Cost
      Dikurangi dengan biaya emisi saham penawaran umum terbatas                     (54.741.313.477)       (54.741.313.477)                       Less: Share Issuance Cost on Limited Public Offering
      Penyesuaian atas Perubahan Kepemilikan                                                                                                                            Adjustment for Changing Ownership
        atas Entitas Anak                                                          (219.945.216.939)      (219.945.216.939)                                                               in Subsidiaries
      Saldo Tambahan modal disetor                                                13.565.914.226.785     13.565.914.226.7850                                                          Total Paid In Capital


    Tambahan modal disetor – agio saham merupakan agio                                                         Additional paid in capital – premium on share
    saham yang berasal dari penawaran umum saham                                                               represent share premium resulting from public
    Perusahaan setelah dikurangi dengan biaya emisi                                                            offering by the Company net off share issuance cost.
    saham.

    Biaya emisi efek ekuitas merupakan biaya yang                                                              Share issuance costs are payments related to
    berkaitan dengan penerbitan efek ekuitas Perusahaan.                                                       the issuance of Company’s equity securities. These
    Biaya ini mencakup fee dan komisi yang dibayarkan                                                          costs include fees and commissions paid to
    kepada penjamin emisi, lembaga dan profesi penunjang                                                       the underwriter, supporting institutions and
    pasar modal, dan biaya pencetakan dokumen                                                                  professionals      in     capital   markets,       and
    pernyataan pendaftaran, biaya pencatatan efek ekuitas                                                      the registration document printing costs, cost of
    dibursa efek, serta biaya promosi sesuai dengan                                                            equity securities listing on the stock exchange, as
    Keputusan       Ketua     Badan      Pasar     Modal                                                       well as promotional cost in accordance with
    No. Kep-97/PM/1996 tanggal 28 Mei 1996 yang diubah                                                         the Decision of the Chairman of the Capital Market
    dengan Kep-06/PM/2000 tanggal 13 Maret 2000,                                                               Board No. Kep-97/PM/1996 dated May 28, 1996 as
    peraturan No. VIII.G.7 tentang Pedoman Penyajian                                                           amended by Kep-06/PM/2000 dated March 13,
    Laporan Keuangan Bab Ekuitas pasal Tambahan Modal                                                          2000, regulation No. VIII.G.7 of Guidelines for
    Disetor. Biaya Emisi Efek Ekuitas berasal dari                                                             the Preparation of Financial Statements Chapter
    penawaran       perdana    tahun     2012    sebesar                                                       Equity article Additional Paid-in Capital. Share
    Rp31.910.365.455, penawaran umum terbatas I tahun                                                          issuance costs derived from the initial public offering
    2015 sebesar Rp37.328.848.507 dan penawaran umum                                                           in 2012 amounting to Rp31,910,365,455, limited
    terbatas II 2021 sebesar Rp17.412.464.970.                                                                 public offering I year 2015 amounting to
                                                                                                               Rp37,328,848,507 and limited public offer II year
                                                                                                               2021 amounting to Rp17,412,464,970.




                                                                                           193
Page 197
                                                                                               The original consolidated financial statements included herein are in
                                                                                                                                          the Indonesian language.


 PT WASKITA KARYA (PERSERO) TBK                                                                        PT WASKITA KARYA (PERSERO) TBK
 DAN ENTITAS ANAK                                                                                                  AND ITS SUBSIDIARIES
 CATATAN ATAS LAPORAN KEUANGAN                                                                    NOTES TO THE INTERIM CONSOLIDATED
 KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                                              FINANCIAL STATEMENTS AS OF JUNE 30, 2023
 31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                                     AND DECEMBER 31, 2022 AND FOR THE SIX
 ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                                            MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
 (2022 – DIAUDIT) – Lanjutan                                                                                (2022 – AUDITED) – Continued
 (Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                                    (Expressed in full Rupiah amount, unless otherwise stated)

39. SALDO LABA                                                                             39. RETAINED EARNINGS

                                                                         30 Juni/             31 Desember/
                                                                      June 30, 2023         December 31, 2022
                                                                           Rp                      Rp
      Telah Ditentukan Penggunaannya                                                                                                                        Appropriated
      Saldo Awal                                                      1.725.598.750.818       1.732.187.379.878                                       Beginning Balance
      Penambahan Dana Cadangan                                                        --         (6.588.629.060)                              Addition to Reserved Fund
      Saldo Akhir                                                     1.725.598.750.818       1.725.598.750.818                                           Ending Balance

      Belum Ditentukan Penggunaannya                                                                                                                        Unappropiated
      Saldo Awal Tahun                                               (9.940.244.897.000)     (7.693.325.785.145)                                        Beginning Balance
       Laba yang Dapat Diatribusikan Kepada Pemilik Entitas Induk    (2.072.505.051.138)     (1.899.817.183.583)         Profit Attributable to Owners of the Parent Entity
       Pengukuran Kembali Program                                                                                                              Remeasurement of Defined
        Imbalan Pasti                                                       (87.797.819)                      --                                             Benefit Plans
       Pembentukan Cadangan Umum                                                      --          6.588.629.060                             Allocation to General Reserve
       Penyesuaian atas Perubahan Kepemilikan                                                                                          Adjustment for Changes Ownership
         Entitas Anak                                                                 --      (353.690.557.332)                                            in Subsidiaries
      Saldo Akhir Tahun                                             (12.012.837.745.957)     (9.940.244.897.000)                                         Ending Balance


    Perusahaan dan entitas anak membuat penyisihan untuk                                        The     Company and subsidiaries provided
    cadangan umum sesuai dengan UU No. 40 tahun 2007                                            appropriation to general reserve in accordance with
    mengenai Perusahaan Terbatas. UU tersebut                                                   Law No. 40 year 2007 concerning Limited Company.
    mengharuskan Perusahaan di Indonesia untuk membuat                                          The law requires companies in Indonesia to provide
    penyisihan cadangan umum sekurang-kurangnya 20%                                             a general reserve at least 20% of the issued and fully
    dari jumlah modal yang ditempatkan dan disetor penuh.                                       paid capital. Reserve funds should be maintained to
    Dana cadangan diadakan untuk menutupi kerugian yang                                         cover suffered losses and can be used as working
    diderita dan dapat dipergunakan sebagai modal kerja                                         capital and other purposes by the decision of the
    dan tujuan lain menurut keputusan RUPS.                                                     AGS.
40. PENDAPATAN USAHA                                                                       40. REVENUES
                                                                                                                                30 Juni/ June 30,
                                                                                                                        2023                             2022
                                                                                                                         Rp                               Rp

     Jasa Konstruksi/ Construction Services                                                                         4.347.670.316.359               5.383.918.367.844
     Bunga dari Jasa Konstruksi/ Interest from Construction Services                                                   23.857.116.421                  32.023.451.209
     Penjualan Precast/ Precast Sales                                                                                 194.413.812.105                  30.683.581.504
     Pendapatan Jalan Tol/ Toll Road Revenue                                                                          548.373.867.905                 459.556.621.089
     Pendapatan Property / Property Revenue                                                                            83.914.498.463                 103.920.950.225
     Penjualan Infrastruktur Lainnya/ Other Infrastructure Revenue                                                     28.758.379.946                  43.453.240.883
     Pendapatan Hotel/ Hotel Revenue                                                                                   41.045.655.932                  34.159.440.657
     Sewa Gedung dan Peralatan/ Buildings and Equipment Rental                                                          4.638.776.163                   2.665.668.745
     Jumlah/ Total                                                                                                  5.272.672.423.294               6.090.381.322.156


    Rincian pendapatan usaha adalah sebagai berikut:                                                The details of the revenues are as follows:
                                                                                                                               30 Juni/ June 30,
                                                                                                                        2023                             2022
                                                                                                                         Rp                               Rp

    Pihak Berelasi/ Related Parties
     PT Jasamarga Japek Selatan                                                                                       487.399.306.725                 582.517.033.605
     PT Cibitung Tanjung Priok Port Tollways                                                                          202.584.088.660                 597.277.504.125
     PT Cimanggis Cibitung Tollways                                                                                   219.860.698.421                 218.833.488.369
     PT Angkasa Pura I (Persero)                                                                                      156.816.495.268                   4.923.046.861
     PT Pelabuhan Indonesia III (Persero)                                                                              61.947.040.382                  10.522.454.000
     PT Trans Jawa Paspro Jalan Tol                                                                                                 --                236.103.509.768
     PT Kresna Kusuma Dyandra Marga                                                                                                 --                223.564.234.975
     Lain-lain/ Others (di bawah/ below Rp 50 Milyar/ Billion )                                                       316.551.567.884                 285.963.156.821
    Sub Jumlah/ Sub Total                                                                                           1.445.159.197.340               2.159.704.428.524




                                                                                194
Page 198
                                                                                The original consolidated financial statements included herein are in
                                                                                                                           the Indonesian language.


 PT WASKITA KARYA (PERSERO) TBK                                                        PT WASKITA KARYA (PERSERO) TBK
 DAN ENTITAS ANAK                                                                                  AND ITS SUBSIDIARIES
 CATATAN ATAS LAPORAN KEUANGAN                                                    NOTES TO THE INTERIM CONSOLIDATED
 KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                              FINANCIAL STATEMENTS AS OF JUNE 30, 2023
 31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                     AND DECEMBER 31, 2022 AND FOR THE SIX
 ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                            MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
 (2022 – DIAUDIT) – Lanjutan                                                                (2022 – AUDITED) – Continued
 (Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                     (Expressed in full Rupiah amount, unless otherwise stated)

                                                                                                                30 Juni/ June 30,
                                                                                                         2023                         2022
                                                                                                          Rp                           Rp
    Pihak Ketiga/ Third Parties
     Kementerian Pekerjaan Umum dan Perumahan Rakyat/
      The Ministry of Public Works and Housing                                                       1.411.494.238.488                947.435.711.475
     BPJT - PT Waskita Sriwijaya Tol                                                                   897.515.837.996              1.087.461.122.614
     BPJT - PT Waskita Transjawa Tol Road                                                              333.593.116.462                              --
     BPJT - PT Pemalang Batang Toll Road                                                               264.827.962.393                214.186.419.821
     BPJT - PT Trans Jabar Tol                                                                         246.572.053.066                243.693.862.089
     The Special Adminstrative Region of Oe-Cusse Ambeno of Oenuno                                     107.339.059.431                              --
     Pemerintah Daerah/ District Governments                                                            99.391.815.977                              --
     BPJT - PT Waskita Bumi Wira                                                                        43.821.436.257                215.573.790.604
     Kementerian Agama/ The Ministry of Religious Affairs                                               26.089.973.362                136.364.531.162
     BPJT - PT Cimanggis Cibitung Tollways                                                                           --               543.426.258.830
     Lain-lain/ Others (di bawah/ below Rp 50 Milyar/ Billion )                                        396.867.732.522                542.535.197.037
    Sub Jumlah/ Sub Total                                                                            3.827.513.225.954              3.930.676.893.632

    Jumlah/ Total                                                                                    5.272.672.423.294              6.090.381.322.156


    Rincian pemberi kerja dengan nilai kontribusi pendapatan                     Details of the project owners with contribution value
    melebihi 10% dari pendapatan usaha Grup untuk 30 Juni                        exceeding 10% of the Group revenues for
    2023 dan 2022 sebagai berikut:                                               June 30, 2023 and 2022 are as follows:

                                                                                                                30 Juni/ June 30,
                                                                                                         2023                          2022
                                                                                                          Rp                            Rp
    Kementerian Pekerjaan Umum dan Perumahan Rakyat/
     The Ministry of Public Works and Housing                                                        1.411.494.238.488            947.435.711.475
    BPJT - PT Waskita Sriwijaya Tol                                                                    897.515.837.996          1.087.461.122.614
    PT Jasamarga Japek Selatan                                                                         487.399.306.725            582.517.033.605
    PT Cibitung Tanjung Priok Port Tollways                                                                          --           597.277.504.125
    Jumlah/ Total                                                                                    2.796.409.383.209          3.214.691.371.819


41. BEBAN POKOK PENDAPATAN                                                 41. COST OF REVENUES

                                                                 30 Juni/ June 30,
                                                          2023                         2022
                                                           Rp                           Rp
      Jasa Konstruksi                                                                                                          Construction Services
        Bahan Baku                                     1.635.723.112.805             1.803.540.029.288                               Raw Material
        Subkontraktor                                  1.353.284.367.134             1.824.355.374.313                              Subcontractor
        Upah                                             374.615.360.712               351.017.819.621                                     Wages
        Beban Tidak Langsung                             924.833.517.374             1.067.683.153.769                              Indirect Costs
      Jumlah Jasa Konstruksi                           4.288.456.358.025             5.046.596.376.991                  Total Constructions Services

      Jalan Tol                                          236.126.356.915              203.208.248.882                                        Toll Roads

      Properti dan Hotel                                 101.022.324.996              130.360.347.781                               Property and Hotel

      Infrastruktur Lainnya                               23.513.346.008               27.217.030.912                           Others Infrastructure
      Produk Beton                                                                                                                 Concrete Products
        Persediaan Awal                                  203.147.938.680               200.651.057.585                         Beginning Balance
        Pembelian                                        173.081.239.335                29.809.241.730                                 Purchases
        Barang tersedia untuk Dijual                     376.229.178.015               230.460.299.315                   Goods Available for Sale
        Persediaan Akhir - Pihak Ketiga                  228.937.125.871               206.583.139.869                Ending Balance - Third Party
        Beban Bahan Baku                                 147.292.052.144                23.877.159.446                     Raw Material Expenses
        Beban Upah                                         3.330.621.077                   614.110.430                    Direct Labour Expenses
        Beban Overhead                                    10.347.452.503                 1.327.631.863                        Overhead Expenses
      Jumlah Produk Beton                                160.970.125.724                25.818.901.739                       Total Concrete Products
      Jumlah Beban Pokok Pendapatan                    4.810.088.511.668             5.433.200.906.305                      Total Cost of Revenues




                                                                     195
Page 199
                                                                                           The original consolidated financial statements included herein are in
                                                                                                                                      the Indonesian language.


 PT WASKITA KARYA (PERSERO) TBK                                                                 PT WASKITA KARYA (PERSERO) TBK
 DAN ENTITAS ANAK                                                                                           AND ITS SUBSIDIARIES
 CATATAN ATAS LAPORAN KEUANGAN                                                             NOTES TO THE INTERIM CONSOLIDATED
 KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                                       FINANCIAL STATEMENTS AS OF JUNE 30, 2023
 31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                              AND DECEMBER 31, 2022 AND FOR THE SIX
 ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                                     MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
 (2022 – DIAUDIT) – Lanjutan                                                                         (2022 – AUDITED) – Continued
 (Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                               (Expressed in full Rupiah amount, unless otherwise stated)

42. BEBAN PENJUALAN DAN BEBAN UMUM DAN                                               42. SELLING EXPENSES AND GENERAL AND
    ADMINISTRASI                                                                         ADMINISTRATIVE EXPENSES

                                                                                                                          30 Juni/ June 30,
                                                                                                                 2023                            2022
                                                                                                                  Rp                              Rp

      Beban Penjualan/ Selling Expenses
       Tender/ Tender                                                                                             6.571.824.639                    1.338.250.714
       Pemasaran/ Marketing                                                                                      44.725.982.759                   46.528.198.691
       Iklan/ Advertising                                                                                         1.394.772.925                    9.926.882.112
      Sub Jumlah/ Sub Total                                                                                      52.692.580.323                   57.793.331.517
      Beban Umum dan Administrasi/ General and Administrative Expenses
       Gaji Pegawai/ Employee's Salaries                                                                        294.138.791.771                 269.246.873.767
       Umum/ General                                                                                            207.570.614.681                 195.688.229.253
       Beban - Non-contributing Plant / Non-contributing Plant - Expenses                                       166.348.854.745                 146.035.457.887
       Penyusutan (Catatan 16)/ Depreciation (Note 16)                                                           75.751.506.675                  95.020.217.594
       Gedung/ Building                                                                                          31.134.595.104                  26.666.833.785
       Kantor/ Office                                                                                            20.154.566.108                  25.601.988.998
       Perjalanan Dinas/ Travelling                                                                              20.276.215.759                  18.895.143.022
       THR/ THR Allowance                                                                                        25.167.774.626                  27.994.391.161
       Jamsostek/ Jamsostek                                                                                      12.808.282.359                  10.699.864.620
       Pesangon/ Severance                                                                                       94.926.687.204                  52.351.816.489
       DPLK/ DPLK                                                                                                             --                    145.233.002
       Provisi atas Penurunan Nilai Persediaan dan Aset Tetap/
        Provision of Impairment Losses Inventories and Property, Plant and Equipment                             76.883.484.815                               --
       Lain-lain/ Others                                                                                         28.887.339.766                  19.473.293.457
                                                                                                                                                              --
      Sub Jumlah/ Sub Total                                                                                   1.054.048.713.613                 887.819.343.035
      Jumlah/ Total                                                                                           1.106.741.293.936                 945.612.674.552

      *) Direklasifikasi pada Catatan 58                                                                                             *) As reclassified in Note 58


    Beban – Non-contributing Plant merupakan evaluasi atas                                  Non-contributing     Plant   Expenses     represent
    jumlah normal atau tidak normal atas pemborosan biaya                                   abnormal amounts of wasted materials, labor or
    produksi, yang meliputi jumlah yang tidak normal atas                                   other product costs, storage costs unless these
    pemborosan bahan, tenaga kerja atau biaya produk                                        costs are required in the production process before
    lainnya, biaya penyimpanan kecuali biaya tersebut                                       proceeding to the next production stage, and
    diperlukan dalam proses produksi sebelum dilanjutkan                                    general and administrative costs, which do not
    pada tahap produksi selanjutnya, biaya administrasi dan                                 contribute to making the inventory in its current
    umum yang tidak memberikan kontribusi untuk membuat                                     condition and location.
    persediaan berada dalam kondisi dan lokasi saat ini.

    Beban umum dan administrasi – lain-lain merupakan                                       General and administrative expenses – others
    amortisasi atas aset lain – lain dan aset tak berwujud.                                 represent the amortization of other assets and
                                                                                            intangible assets.

43. PENDAPATAN (BEBAN) LAIN-LAIN - BERSIH                                            43. OTHER INCOME (EXPENSES) – NET

                                                                                                                           30 Juni/ June 30,
                                                                                                                   2023                           2022
                                                                                                                    Rp                             Rp

      Keuntungan dari Divestasi Entitas Anak dan Asosiasi/
       Gain on Divesment of Subsidiary and Associates                                                                           --                76.602.456.099
      Keuntungan atas Modifikasi Utang/ Gain on Modification of Debt                                              329.025.074.090              2.380.844.226.478
      Pemulihan (Penyisihan) Kerugian Ekpektasian Penurunan Nilai (Catatan 5, 7, 8, 10)/
       Recovery (Allowance) For Impairment Expected Credit Losses (Notes 5, 7, 8, 10)                               46.585.826.516                131.504.071.503
      Pendapatan (Beban) Lain-lain Proyek/ Others Revenue (Expenses) Project                                       (7.724.707.534)                  1.528.403.954
      Pendapatan (Beban) Lain-lain KSO/ Others Revenue (Expenses) JV                                              (22.240.777.136)                 10.428.969.140
      Pendapatan (Beban) Lain-lain/ Others Revenue (Expense)                                                         3.571.970.162              (113.388.298.590)
      Jumlah/ Total                                                                                               349.217.386.098              2.487.519.828.584


    Pendapatan (beban) lain-lain – lain-lain merupakan                                      Other income (expenses) - others represent non
    pendapatan non-operasional yang berasal dari                                            operating income from restructuring of bank loan
    restrukturisasi utang bank dan utang obligasi pada entitas                              and bonds payable in subsidiary, completed
    anak, proyek yang sudah selesai, selisih dari estimasi                                  projects, others JV, difference between estimated
    akrual dibandingkan dengan realisasi yang disajikan                                     accruals compared to realization which is presented

                                                                           196
Page 200
                                                                                                    The original consolidated financial statements included herein are in
                                                                                                                                               the Indonesian language.


 PT WASKITA KARYA (PERSERO) TBK                                                                           PT WASKITA KARYA (PERSERO) TBK
 DAN ENTITAS ANAK                                                                                                     AND ITS SUBSIDIARIES
 CATATAN ATAS LAPORAN KEUANGAN                                                                       NOTES TO THE INTERIM CONSOLIDATED
 KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                                                 FINANCIAL STATEMENTS AS OF JUNE 30, 2023
 31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                                        AND DECEMBER 31, 2022 AND FOR THE SIX
 ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                                               MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
 (2022 – DIAUDIT) – Lanjutan                                                                                   (2022 – AUDITED) – Continued
 (Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                                         (Expressed in full Rupiah amount, unless otherwise stated)

    bersih dengan beban lain-lain proyek selesai, laba atas                                            net of other expenses for completed projects, profit
    divestasi, dan lain-lain KSO.                                                                      on divestment, and others JV

44. BEBAN KEUANGAN                                                                             44. FINANCIAL CHARGES

    Akun ini merupakan beban bunga atas utang bank/ non-                                               This account represents group’s interest expenses
    bank, beban provisi, dan beban administrasi bank yang                                              on bank loans/ non-banks, provision fees, and
    terkait dengan perolehan pinjaman Grup selama periode                                              administrative expenses related to the acquisition of
    berjalan setelah dikurangi biaya bunga yang secara                                                 bank loans during the current period after deducting
    langsung dapat diatribusikan dengan biaya perolehan                                                the interest costs which are directly attributable to
    suatu proyek tertentu yang memenuhi syarat dan beban                                               the cost of a qualifying project and the interest
    bunga atas utang obligasi Perusahaan.                                                              expense on debt Corporate bonds

45. BAGIAN LABA (RUGI) BERSIH ENTITAS ASOSIASI                                                 45. EQUITY IN NET INCOME (LOSS)                                                  OF
    DAN VENTURA BERSAMA                                                                            ASSOCIATES AND JOINT VENTURES

                                                                                   30 Juni/ June 30,
                                                                           2023                        2022
                                                                            Rp                          Rp
    Bagian Laba Bersih Ventura                                                                                                                          Equity in Net Income of
     Bersama Konstruksi (Catatan 13)                                    (213.978.943.580)          (178.093.633.926)                   Construction Joint Ventures (Note 13)
    Bagian Laba (Rugi) Bersih                                                                                                                    Equity in Net Income (Loss) of
     Entitas Asosiasi (Catatan 13)                                       (15.018.032.947)           (35.456.340.568)                           Associates Entities (Note 13)
    Jumlah                                                              (228.996.976.527)          (213.549.974.494)                                                          Total


46. KEPENTINGAN NON-PENGENDALI                                                                 46. NON-CONTROLLING INTEREST

                                                                                                                      30 Juni/ June 30, 2023
                                                                                                                     Bagian Laba (Rugi)         Penambahan
                                                                                                Nilai Awal/           Tahun Berjalan/          (Pengurangan)/         Nilai Akhir/
                                                                             Kepemilikan/       Beginning              Profit (Loss)              Additional           Ending
                                                                              Ownership          Balance               Current Year              (Deduction)           Balance
                                                                                 %                  Rp                      Rp                       Rp                   Rp

      PT Dana Tabungan dan Asuransi Negeri (Persero) (Untuk/ for WTR)             7,90%         2.033.632.643.095        (32.541.269.452)                       --   2.001.091.373.643
      Masyarakat Umum (Untuk/ for WBP)                                            40,00%        1.851.509.003.354       (105.504.278.916)                       --   1.746.004.724.438
      RDPT WTTR (Untuk/ for WTTR)                                                 11,92%          629.153.411.627             328.619.633                       --     629.482.031.260
      PT Sumber Mitra Jaya (Untuk/ for PBTR)                                      40,00%          371.350.414.458        (23.978.575.852)                       --     347.371.838.606
      PT Bagasasi Inti Pratama (untuk/ for WMR)                                   40,00%          161.634.455.696           (272.656.572)                       --     161.361.799.124
      PT Graha Jasa Ekatama (Untuk/ for WFPR)                                     40,00%           70.978.163.796             382.535.268                       --      71.360.699.064
      PT Shalawat Power (Untuk/ for WSE)                                          6,00%            18.951.626.603              38.684.228                       --      18.990.310.831
      Perusahaan Daerah Prodexim (Untuk/ for WST)                                 0,81%             3.329.677.373            (33.860.253)                       --       3.295.817.120
      PT Kaltim Binasarana Konstruksi (Untuk/ for TTB)                            20,00%            1.633.633.428                   56.867                      --       1.633.690.295
      PT Panca Wira Usaha (Untuk/ for WBW)                                        0,19%             1.452.888.533           (267.862.751)                       --       1.185.025.782
      Perusda Benuo Taka (Untuk/ for TTB)                                         15,00%            1.225.225.070                   42.650                      --       1.225.267.720
      Perusda Komaba (Untuk/ for TTB)                                             5,00%               408.408.358                   14.217                      --         408.422.575
      Perusahaan Daerah Bende Seguguk (Untuk/ for WST)                            1,00%                83.562.318            (41.648.111)                       --          41.914.207
      Koperasi Waskita (Untuk/ for WKR)                                           0,01%                  1.416.744                (30.927)                      --            1.385.817
      Koperasi Waskita (Untuk/ for WTR)                                           0,01%                  1.003.938                       --                     --            1.003.938
      Koperasi Waskita (Untuk/ for PT WKI)                                        0,01%                    510.123              (128.035)                       --              382.088
      Koperasi Waskita (Untuk/ for WBP)                                           0,01%                  (407.261)              (139.429)                       --            (546.690)
      Koperasi Waskita (Untuk/ for WWE)                                           0,05%                  (997.753)              (148.738)                       --          (1.146.491)
      Koperasi Waskita (Untuk/ for TJT)                                           0,00%                (5.070.147)                (27.040)                      --          (5.097.187)
      Jumlah/ Total                                                                             5.145.339.569.353       (161.890.673.213)                       --   4.983.448.896.140




                                                                                      197
Page 201
                                                                                                     The original consolidated financial statements included herein are in
                                                                                                                                                the Indonesian language.


 PT WASKITA KARYA (PERSERO) TBK                                                                            PT WASKITA KARYA (PERSERO) TBK
 DAN ENTITAS ANAK                                                                                                      AND ITS SUBSIDIARIES
 CATATAN ATAS LAPORAN KEUANGAN                                                                        NOTES TO THE INTERIM CONSOLIDATED
 KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                                                  FINANCIAL STATEMENTS AS OF JUNE 30, 2023
 31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                                         AND DECEMBER 31, 2022 AND FOR THE SIX
 ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                                                MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
 (2022 – DIAUDIT) – Lanjutan                                                                                    (2022 – AUDITED) – Continued
 (Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                                          (Expressed in full Rupiah amount, unless otherwise stated)

                                                                                                                   31 Desember/ December 31, 2022
                                                                                                                       Bagian Laba (Rugi)       Penambahan
                                                                                                Nilai Awal/             Tahun Berjalan/        (Pengurangan)/           Nilai Akhir/
                                                                               Kepemilikan/     Beginning                Profit (Loss)            Additional             Ending
                                                                                Ownership         Balance                Current Year            (Deduction)             Balance
                                                                                    %               Rp                         Rp                    Rp                     Rp
      PT Dana Tabungan dan Asuransi Negeri (Persero) (Untuk/ for WTR)             7,90%         1.994.270.708.458            39.361.934.637                      --   2.033.632.643.095
      Masyarakat Umum (Untuk/ for WBP)                                           40,00%         1.581.201.173.055           270.307.830.299                      --   1.851.509.003.354
      RDPT WTTR (Untuk/ for WTTR)                                                11,92%                          --        (16.920.524.467)        646.073.936.094      629.153.411.627
      PT Sumber Mitra Jaya (Untuk/ for PBTR)                                     40,00%           435.816.498.720          (64.466.084.262)                      --     371.350.414.458
      PT Bagasasi Inti Pratama (untuk/ for WMR)                                  40,00%           162.890.161.204            (1.255.705.508)                     --     161.634.455.696
      PT Graha Jasa Ekatama (Untuk/ for WFPR)                                    40,00%           197.582.755.175              3.943.408.621     (130.548.000.000)       70.978.163.796
      PT Shalawat Power (Untuk/ for WSE)                                          6,00%            17.655.114.324              1.296.512.279                     --      18.951.626.603
      Perusahaan Daerah Prodexim (Untuk/ for WST)                                 0,81%             3.590.336.602              (260.659.229)                     --        3.329.677.373
      PT Kaltim Binasarana Konstruksi (Untuk/ for TTB)                           20,00%             1.634.800.385                 (1.166.957)                    --        1.633.633.428
      PT Panca Wira Usaha (Untuk/ for WBW)                                        0,19%             2.207.900.289              (755.011.756)                     --        1.452.888.533
      Perusda Benuo Taka (Untuk/ for TTB)                                        15,00%             1.226.100.288                   (875.218)                    --        1.225.225.070
      Perusda Komaba (Untuk/ for TTB)                                             5,00%               408.700.097                   (291.739)                    --          408.408.358
      Perusahaan Daerah Bende Seguguk (Untuk/ for WST)                            1,00%               404.173.170              (320.610.852)                     --           83.562.318
      Koperasi Waskita (Untuk/ for WKR)                                           0,01%                  1.405.357                     11.387                    --             1.416.744
      Koperasi Waskita (Untuk/ for WTR)                                           0,01%                  1.003.938                          --                   --             1.003.938
      Koperasi Waskita (Untuk/ for PT WKI)                                        0,01%                    643.399                  (133.276)                    --               510.123
      PT Sarana Multi Infrastruktur (Untuk/ for WTR)                             10,62%           992.629.901.949                           --   (992.629.901.949)                      --
      PT Bakrie and Brothers Tbk (Untuk/ for CCT)                                 5,00%                72.522.799                           --         (72.522.799)                     --
      PT Bakrie Toll Indonesia (Untuk/ for CCT)                                   5,00%                72.522.799                           --         (72.522.799)                     --
      Efek Divestasi                                                              0,00%                          --          (3.845.329.728)         3.845.329.728                      --
      Koperasi Waskita (Untuk/ for WBP)                                           0,01%                  (764.485)                    357.224                    --             (407.261)
      Koperasi Waskita (Untuk/ for WWE)                                           0,05%                  (997.874)                        121                    --             (997.753)
      Koperasi Waskita (Untuk/ for TJT)                                           0,00%                (4.785.094)                  (285.053)                    --           (5.070.147)
      Jumlah/ Total                                                                             5.391.659.874.555           227.083.376.523      (473.403.681.725)    5.145.339.569.353


47. LABA (RUGI) PER SAHAM                                                                       47. EARNING (LOSS) PER SHARE

    Berikut ini adalah data yang digunakan untuk perhitungan                                            Following the details of the calculation of basic
    laba (rugi) per saham dasar:                                                                        earning (loss) per share:

                                                                                    30 Juni/ June 30,
                                                                             2023                       2022
                                                                              Rp                         Rp
    Laba Bersih yang Diatribusikan                                                                                                                        Net Income Attributable
     Kepada Entitas Induk                                               (2.072.505.051.138)       (236.517.657.332)                                           to Parent Entity
    Rata - rata Bertimbang Saham                                             28.806.807.016          28.806.807.016                                   Weighted Average of Shares
    Laba (Rugi) Per Saham Dasar                                                      (71,94)                     (8,21)                       Basic Earning (Loss) Per Shares


48. BANK GARANSI DAN LETTER OF CREDIT                                                           48. BANK GUARANTEE AND LETTER OF CREDIT

    Pada tanggal 30 Juni 2023 dan 31 Desember 2022,                                                     As of June 30, 2023 and December 31, 2022,
    Perusahaan telah mendapatkan fasilitas bank garansi,                                                the Company has obtained the bank guarantees, LC
    L/C dan SKBDN sebagai berikut:                                                                      and SKBDN facility as follows:

                                                                                                                                 30 Juni/                      31 Desember/
                                                                                                                              June 30, 2023                  December 31, 2022
                                                                                                                                   Rp                               Rp
    Pihak Berelasi/ Related Parties
     Perusahaan/ the Company
      PT Bank Rakyat Indonesia (Persero) Tbk                                                                                    1.700.000.000.000                 3.890.000.000.000
      PT Bank Mandiri (Persero) Tbk                                                                                             1.700.000.000.000                 1.700.000.000.000
      PT Bank Negara Indonesia (Persero) Tbk                                                                                      645.000.000.000                 1.290.000.000.000
      Indonesia Eximbank                                                                                                          147.643.640.349                                 --
    Pihak Ketiga/ Third Parties
     Perusahaan/ the Company
      PT Bank Pan Indonesia Tbk                                                                                                                       --          2.500.000.000.000
      PT Bank Mizuho Indonesia                                                                                                                        --          1.000.000.000.000
      PT Bank BTPN Tbk                                                                                                                                --            950.000.000.000
      PT Bank UOB Indonesia                                                                                                                           --          1.200.000.000.000
      PT Bank HSBC Indonesia                                                                                                                          --            250.000.000.000
      PT Bank BNP Paribas Indonesia                                                                                                                   --            500.000.000.000
      PT Bank Maybank Indonesia Tbk                                                                                                                   --            175.000.000.000
    Jumlah/ Total                                                                                                               4.192.643.640.349               13.455.000.000.000




                                                                                       198
Page 202
                                                                                                                                          The original consolidated financial statements included herein are in
                                                                                                                                                                                     the Indonesian language.


 PT WASKITA KARYA (PERSERO) TBK                                                                                                             PT WASKITA KARYA (PERSERO) TBK
 DAN ENTITAS ANAK                                                                                                                                       AND ITS SUBSIDIARIES
 CATATAN ATAS LAPORAN KEUANGAN                                                                                                         NOTES TO THE INTERIM CONSOLIDATED
 KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                                                                                   FINANCIAL STATEMENTS AS OF JUNE 30, 2023
 31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                                                                          AND DECEMBER 31, 2022 AND FOR THE SIX
 ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                                                                                 MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
 (2022 – DIAUDIT) – Lanjutan                                                                                                                     (2022 – AUDITED) – Continued
 (Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                                                                             (Expressed in full Rupiah amount, unless otherwise stated)

     Perusahaan juga memiliki fasilitas bank garansi, L/C dan                                                                               The Company also obtained bank guarantess, L/C
     SKBDN yang telah digunakan sebagai berikut:                                                                                            and SKBDN facilities with the total usage as follows:

                                                                                                                                                                               30 Juni/                               31 Desember/
                                                                                                                                                                            June 30, 2023                           December 31, 2022
                                                                                                                                                                                 Rp                                        Rp
      Pihak Berelasi/ Related Parties
       Perusahaan/ the Company
        PT Bank Rakyat Indonesia (Persero) Tbk                                                                                                                                   692.499.196.597                         2.444.048.859.176
        PT Bank Mandiri (Persero) Tbk                                                                                                                                            739.086.962.983                         1.186.233.152.675
        PT Bank Negara Indonesia (Persero) Tbk                                                                                                                                   252.385.569.261                           637.181.126.115
        Indonesia Eximbank                                                                                                                                                       147.643.640.349                                         --
      Jumlah/ Total                                                                                                                                                           1.831.615.369.190                          4.267.463.137.966


49. SUPPLY CHAIN FINANCING (SCF)                                                                                                  49. SUPPLY CHAIN FINANCING (SCF)

    Perusahaan dan entitas anak memiliki fasilitas SCF yang                                                                                  The Company and a subsidiary obtained SCF
    digunakan untuk membayar tagihan mitra kerja sebagai                                                                                     facilities were used to pay working partners’ bill as
    berikut:                                                                                                                                 follows:

                                                                                                                                                                              30 Juni/                                31 Desember/
                                                                                                                                                                           June 30, 2023                            December 31, 2022
                                                                                                                                                                                Rp                                         Rp
    PT Bank Syariah Indonesia (d/h PT Bank Mandiri Syariah) - SCF                                                                                                               485.928.232.951                            491.955.599.510
    Jumlah/ Total                                                                                                                                                               485.928.232.951                            491.955.599.510


50. REKONSILIASI LIABILITAS YANG TIMBUL DARI                                                                                     50. RECONCILIATION OF LIABILITIES                                                                    ARISING
    AKTIVITAS PENDANAAN                                                                                                              FROM FINANCING ACTIVITIES

     Tabel di bawah ini menjelaskan perubahan dalam                                                                                          The table below explains the changes in
     liabilitas Grup yang timbul dari aktivitas pendanaan,                                                                                   the Group’s liabilities arising from financing
     termasuk perubahan yang timbul dari arus kas dan                                                                                        activities, including both cash and non-cash
     perubahan nonkas. Liabilitas yang timbul dari aktivitas                                                                                 changes. Liabilities arising from financing activities
     pendanaan adalah liabilitas yang arus kas, atau arus kas                                                                                are those for which cash flows were, or future cash
     masa depannya, diklasifikasikan dalam laporan arus kas                                                                                  flows will be, classified in the Group’s consolidated
     konsolidasian Grup sebagai arus kas dari aktivitas                                                                                      statement of cash flows as cash flows from financing
     pendanaan.                                                                                                                              activities.

                                                                        Arus Kas dari Aktivitas Pendanaan/                                  Perubahan Transaksi non Kas/
                                       1 Januari/                             Financing Cash Flows                                               Non-cash Changes                                30 Juni/
                                       January 1,           Penambahan/           Pembayaran/              Biaya Emisi/         Amortisasi/        Restrukturisasi/      Sewa Pembiayaan/        June 30,
                                          2023               Additional             Payment               Issuance cost        Amortization       Restructurisation        Finance Lease           2023
                                           Rp                   Rp                     Rp                      Rp                  Rp                    Rp                     Rp                  Rp
    Pinjaman Bank                     47.563.432.430.672      634.653.667.389       (556.678.626.439)                     --                   --      171.413.194.428                    --   47.812.820.666.050                                 Bank Loans
    Utang Lembaga Keuangan Non-Bank    4.538.846.968.540      816.526.280.629                      --                     --                   --                    --                   --    5.355.373.249.169     Loan to Financial Institution Non-Bank
    Utang Obligasi                    10.659.386.827.469                    --                     --                     --       9.878.004.696                     --                   --   10.669.264.832.165                             Bonds Payable
    Utang Sukuk Mudharabah             1.144.905.871.186                    --                     --                     --          57.046.337                     --                   --    1.144.962.917.523               Sukuk Mudharabah Payable
    Surat Utang Jangka Menengah          725.000.000.000                    --                     --                     --                   --                    --                   --      725.000.000.000                       Medium Term Notes
    Liabilitas Sewa                       38.410.896.550                    --       (10.619.530.907)                     --                   --                    --       2.153.805.745        29.945.171.388                             Lease Liabilities
    Jumlah                            64.669.982.994.417    1.451.179.948.018       (567.298.157.346)                     --       9.935.051.033       171.413.194.428        2.153.805.745    65.737.366.836.295                                        Total


                                                                        Arus Kas dari Aktivitas Pendanaan/                                  Perubahan Transaksi non Kas/
                                       1 Januari/                             Financing Cash Flows                                               Non-cash Changes                              31 Desember/
                                       January 1,           Penambahan/           Pembayaran/              Biaya Emisi/         Amortisasi/         Utang Bank/          Sewa Pembiayaan/      December 31,
                                          2021               Additional             Payment               Issuance cost        Amortization          Bank Loan             Finance Lease           2022
                                           Rp                   Rp                     Rp                      Rp                  Rp                    Rp                     Rp                  Rp
    Pinjaman Bank                     53.697.455.801.667    5.041.750.181.172     (8.062.519.411.327)                     --                   --   (3.113.254.140.840)                   --   47.563.432.430.672                                 Bank Loans
    Utang Lembaga Keuangan Non-Bank    2.360.440.508.707      448.832.866.347                      --                     --                   --     1.729.573.593.486                   --    4.538.846.968.540     Loan to Financial Institution Non-Bank
    Utang Obligasi                    11.497.555.639.886    2.127.300.000.000     (3.025.000.000.000)        (9.339.320.000)      14.273.440.486         54.597.067.097                   --   10.659.386.827.469                             Bonds Payable
    Utang Sukuk Mudharabah                             --   1.148.100.000.000                      --        (3.336.771.580)         142.642.766                      --                  --    1.144.905.871.186               Sukuk Mudharabah Payable
    Surat Utang Jangka Menengah          250.000.000.000      725.000.000.000       (250.000.000.000)                     --                   --                     --                  --      725.000.000.000                       Medium Term Notes
    Liabilitas Sewa                       65.520.713.697                    --       (37.595.618.302)                     --                   --                     --     10.485.801.155        38.410.896.550                             Lease Liabilities
    Jumlah                            67.870.972.663.957    9.490.983.047.519    (11.375.115.029.629)       (12.676.091.580)      14.416.083.252    (1.329.083.480.257)      10.485.801.155    64.669.982.994.417                                        Total




                                                                                                                    199
Page 203
                                                                                                                                       The original consolidated financial statements included herein are in
                                                                                                                                                                                  the Indonesian language.


 PT WASKITA KARYA (PERSERO) TBK                                                                                                           PT WASKITA KARYA (PERSERO) TBK
 DAN ENTITAS ANAK                                                                                                                                     AND ITS SUBSIDIARIES
 CATATAN ATAS LAPORAN KEUANGAN                                                                                                       NOTES TO THE INTERIM CONSOLIDATED
 KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                                                                                 FINANCIAL STATEMENTS AS OF JUNE 30, 2023
 31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                                                                        AND DECEMBER 31, 2022 AND FOR THE SIX
 ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                                                                               MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
 (2022 – DIAUDIT) – Lanjutan                                                                                                                   (2022 – AUDITED) – Continued
 (Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                                                                           (Expressed in full Rupiah amount, unless otherwise stated)

    Pengungkapan tambahan atas aktivitas investasi non-                                                                                  Supplemental disclosures on non-cash investing
    kas:                                                                                                                                 activities:

                                                                                   30 Juni/                                       31 Desember/
                                                                                June 30, 2023                                   December 31, 2022
                                                                                     Rp                                                Rp

   Penambahan Aset Tetap Melalui                                                                                                                                                         Acquisition of Fixed Asset Through
    Utang Usaha                                                                                                       --                     10.094.430.000                                                 Accounts Payable
   Penambahan Aset Tak Berwujud Melalui                                                                                                                                               Acquisition of Intangible Asset Through
    Liabilitas dan Akuisisi                                                                 2.941.029.595                             3.465.359.532.489                                            Liabilities and Acquisition
   Penambahan Aset Hak Guna Melalui                                                                                                                                                     Acquisition of Lease Assets Through
    Sewa Pembiayaan                                                                         2.153.805.745                                10.485.801.155                                                        Finance Lease
   Jumlah                                                                                   5.094.835.340                             3.485.939.763.644                                                                  Total


51. ASET DAN LIABILITAS MONETER DALAM MATA                                                                                      51. MONETARY ASSETS                                             AND           LIABILITIES                        IN
    UANG ASING                                                                                                                      FOREIGN CURRENCY

    Pada tanggal 30 Juni 2023 dan 31 Desember 2022,                                                                                      As of June 30, 2023 and December 31, 2022,
    Perusahaan mempunyai aset dan liabilitas moneter                                                                                     the Company have monetary assets and liabilities
    dalam mata uang asing sebagai berikut:                                                                                               denominated in foreign currencies were as follows:

                                                                                                               30 Juni/ June 30, 2023                                                 31 Desember/ December 31, 2022
                                                                                                      Mata Uang Asing/           Ekuivalen/                                      Mata Uang Asing/         Ekuivalen/
                                                                                                      Foreign Currency           Equivalent                                      Foreign Currency         Equivalent
   Aset/ Assets
    Kas dan Setara Kas/
     Cash and Cash Equivalents                                                   USD                                    20.510.724                  308.194.143.258                            5.291.371                       83.238.558.323
                                                                                 YEN                                   283.573.420                   29.752.296.389                          304.585.789                       35.809.130.827
                                                                                EURO                                           551                        9.020.928                                3.409                           56.980.208
                                                                                 SAR                                        10.324                       41.353.012                                9.883                           41.353.012
                                                                                 MYR                                         3.837                       12.328.016                                3.467                           12.328.016
   Piutang Usaha/
    Accounts Receivable                                                          SAR                                     13.231.538                   53.000.910.398                           12.666.507                      53.000.910.398
                                                                                 USD                                      2.538.596                   38.144.936.424                              519.280                       8.168.795.936
   Piutang Retensi/
    Retention Receivables                                                        SAR                                       6.917.165                  27.707.741.349                            6.621.779                      27.707.741.349
                                                                                 USD                                       6.214.536                  93.379.620.635                            5.434.825                      85.495.234.112
   Tagihan Bruto Kepada Pengguna Jasa/
    Gross Amount Due From Customers                                              USD                                       3.324.451                  49.953.207.072                            1.397.464                      21.983.511.313
   Jumlah/ Total                                                                                                                                    600.195.557.481                                                          315.514.543.494


52. SEGMEN OPERASI                                                                                                              52. OPERATION SEGMENT

     a. Informasi tentang Produk dan Jasa                                                                                                a. Information Related to Products and Services

         Segmen operasi Perusahaan dikelompokkan                                                                                               The Company’s operation segment is grouped
         berdasarkan pekerjaan yang dilakukan.                                                                                                 based on the work performed.

         Informasi Segmen berdasarkan jenis usaha/ produk                                                                                      Details of information of segment based on
         adalah sebagai berikut:                                                                                                               the type of business/ product were as follows:

                                                                                                                     30 Juni/ June 30, 2023
                                                 Konstruksi/         Sewa Gedung/           Properti & Hotel/          Beton Pracetak/ Infrastruktur Lainnya/          Tol/                Jumlah/
                                                Constructions        Building Rental        Property & Hotel              Precast           Others Infrastructure      Toll                 Total
                                                     Rp                     Rp                    Rp                          Rp                     Rp                 Rp                   Rp
        Pendapatan Usaha                        4.371.527.432.780        4.638.776.163        124.960.154.395              194.413.812.105        28.758.379.946    548.373.867.905      5.272.672.423.294                                   Revenues
        Beban Pokok Pendapatan                  4.288.456.358.025                    --       101.022.324.996              160.970.125.724        23.513.346.008    236.126.356.915      4.810.088.511.668                           Cost of Revenues
        Laba Bruto                                 83.071.074.755        4.638.776.163         23.937.829.399               33.443.686.381         5.245.033.938    312.247.510.990        462.583.911.626                                 Gross Profit
        Tidak Dapat Dialokasikan:                                                                                                                                                                                                          Unallocated:
        Beban Usaha                                             --                     --                       --                      --                     --                --     (1.106.741.293.936)                        Operating Expenses
        Penghasilan Lain-lain - Bersih                          --                     --                       --                      --                     --                --         790.727.082.191                       Other Revenues - Net
        Laba Sebelum Pajak dan Beban Keuangan                   --                     --                       --                      --                     --                --         146.569.699.881   Income Before Tax and Financial Charges
        Beban Keuangan                                          --                     --                       --                      --                     --                --     (2.079.553.962.639)                           Financial Charges
        Bagian Rugi Bersih Entitas Asosiasi                                                                                                                                                                            Equity in Net Loss of Associates
          dan Ventura Bersama                                   --                     --                       --                      --                     --                --       (228.996.976.527)                        and Joint Ventures
        Laba Sebelum Pajak                                      --                     --                       --                      --                     --                --     (2.161.981.239.285)                          Income Before Tax
        Beban Pajak Penghasilan                                 --                     --                       --                      --                     --                --        (72.414.485.066)                      Income Tax Expenses
        Laba Bersih Periode Berjalan                                                                                                                                                    (2.234.395.724.351)               Net Profit in Current Period




                                                                                                           200
Page 204
                                                                                                                                             The original consolidated financial statements included herein are in
                                                                                                                                                                                        the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                                                                                PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                                                                                          AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                                                                                      FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                                                                             AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                                                                                    MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                                                                                        (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                                                                                   (Expressed in full Rupiah amount, unless otherwise stated)

                                                                                                                          30 Juni/ June 30, 2022
                                                    Konstruksi/         Sewa Gedung/            Properti & Hotel/           Beton Pracetak/ Infrastruktur Lainnya/              Tol/                   Jumlah/
                                                   Constructions        Building Rental         Property & Hotel               Precast           Others Infrastructure          Toll                    Total
                                                        Rp                     Rp                     Rp                           Rp                     Rp                     Rp                      Rp
      Pendapatan Usaha                             5.415.941.819.053        2.665.668.745          138.080.390.882             30.683.581.504             43.453.240.883     459.556.621.089         6.090.381.322.156                                   Revenues
      Beban Pokok Pendapatan                       5.046.596.376.991                    --         130.360.347.781             25.818.901.739             27.217.030.912     203.208.248.882         5.433.200.906.305                           Cost of Revenues
      Laba Bruto                                     369.345.442.062        2.665.668.745            7.720.043.101              4.864.679.765             16.236.209.971     256.348.372.207           657.180.415.851                                 Gross Profit
      Tidak Dapat Dialokasikan:                                                                                                                                                                                                                        Unallocated:
      Beban Usaha                                                  --                     --                        --                        --                        --                 --         (945.612.674.552)                        Operating Expenses
      Penghasilan Lain-lain - Bersih                               --                     --                        --                        --                        --                 --         2.920.397.533.757                       Other Revenues - Net
      Laba Sebelum Pajak dan Beban Keuangan                        --                     --                        --                        --                        --                 --         2.631.965.275.056   Income Before Tax and Financial Charges
      Beban Keuangan                                               --                     --                        --                        --                        --                 --       (1.966.459.822.098)                           Financial Charges
      Bagian Rugi Bersih Entitas Asosiasi                                                                                                                                                                                          Equity in Net Loss of Associates
        dan Ventura Bersama                                        --                     --                        --                        --                        --                 --         (213.549.974.494)                        and Joint Ventures
      Laba Sebelum Pajak                                           --                     --                        --                        --                        --                 --           451.955.478.464                          Income Before Tax
      Beban Pajak Penghasilan                                      --                     --                        --                        --                        --                 --         (158.035.141.851)                      Income Tax Expenses
      Laba Bersih Periode Berjalan                                                                                                                                                                      293.920.336.613               Net Profit in Current Period


                                                                                                                          30 Juni/ June 30, 2023
                                                    Konstruksi/         Sewa Gedung/             Properti & Hotel/          Beton Pracetak/         Infrastruktur Lainnya/       Tol/                   Jumlah/
                                                   Constructions        Building Rental         Property & Hotel                Precast             Others Infrastructure        Toll                    Total
                                                        Rp                     Rp                     Rp                          Rp                         Rp                   Rp                      Rp
      Aset                                                                                                                                                                                                                                                 Assets
        Piutang Usaha                              1.585.433.477.947        4.161.728.633                        --            564.244.678.914                          --                     --     2.153.839.885.494                    Accounts Receivable
        Piutang Retensi                            1.535.611.621.928                    --                       --                          --                         --                     --     1.535.611.621.928                   Retention Receivable
        Tagihan Bruto Kepada Pengguna Jasa         5.976.851.489.682                    --                       --                          --                         --                     --     5.976.851.489.682       Gross Amount Due from Customers
        Persediaan                                   403.804.336.674                    --       3.476.435.303.445             192.347.044.662             25.433.735.781                      --     4.098.020.420.562                             Inventories
        Aset yang Tidak Dapat Dialokasikan                         --                   --                       --                          --                         --                     --    82.556.408.230.076                     Unallocated Assets
      Jumlah Aset                                                                                                                                                                                    96.320.731.647.742                             Total Assets
      Liabilitas                                                                                                                                                                                                                                        Liabilities
        Utang Usaha                                7.179.063.756.744                       --                        --                      --                         --                     --     7.179.063.756.744                      Accounts Payable
        Utang Bruto Subkontraktor                  1.529.992.874.175                       --                        --        123.680.367.317              1.629.744.594                      --     1.655.302.986.086      Gross Amount Due to Subcontractors
        Liabilitas yang Tidak Dapat Dialokasikan                   --                      --                        --                      --                         --                     --    75.476.524.325.801                   Unallocated Liabilities
      Jumlah Liabilitas                                                                                                                                                                              84.310.891.068.631                           Total Liabilities


                                                                                                               31 Desember/ December 31, 2022
                                                    Konstruksi/         Sewa Gedung/            Properti & Hotel/          Beton Pracetak/         Infrastruktur Lainnya/       Tol/                  Jumlah/
                                                   Constructions        Building Rental         Property & Hotel               Precast             Others Infrastructure       Toll                     Total
                                                        Rp                     Rp                     Rp                         Rp                         Rp                  Rp                       Rp
      Aset                                                                                                                                                                                                                                               Assets
        Piutang Usaha                              1.407.437.394.679        2.777.624.986                       --            457.079.186.054                          --                 --         1.867.294.205.719                   Accounts Receivable
        Piutang Retensi                            1.463.752.471.746                    --                      --                          --                         --                 --         1.463.752.471.746                  Retention Receivable
        Tagihan Bruto Kepada Pengguna Jasa         7.877.664.742.737                    --                      --                          --                         --                 --         7.877.664.742.737      Gross Amount Due from Customers
        Persediaan                                   366.269.646.540                    --      3.681.585.622.798             212.277.810.494             23.327.098.155                  --         4.283.460.177.987                            Inventories
        Aset yang Tidak Dapat Dialokasikan                         --                   --                      --                          --                         --                 --        82.740.145.030.657                    Unallocated Assets
      Jumlah Aset                                                                                                                                                                                   98.232.316.628.846                            Total Assets
      Liabilitas                                                                                                                                                                                                                                      Liabilities
        Utang Usaha                                7.449.149.336.334                      --                        --                      --                         --                 --         7.449.149.336.334                     Accounts Payable
        Utang Bruto Subkontraktor                  2.060.192.005.461                      --                        --         78.245.691.215              4.268.444.203                  --         2.142.706.140.879     Gross Amount Due to Subcontractors
        Liabilitas yang Tidak Dapat Dialokasikan                   --                     --                        --                      --                         --                 --        74.395.776.470.867                  Unallocated Liabilities
      Jumlah Liabilitas                                                                                                                                                                             83.987.631.948.080                          Total Liabilities




                                                                                                                201
Page 205
                                                                                       The original consolidated financial statements included herein are in
                                                                                                                                  the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                               PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                                         AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                           NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                                     FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                            AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                                   MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                                       (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                           (Expressed in full Rupiah amount, unless otherwise stated)

   b. Informasi tentang Wilayah Geografis                                         b.     Information Related to the Geographic

       Grup beroperasi di lima wilayah geografis utama                                  The Group’s operation are located in five principal
       yang berlokasi di Jakarta (Catatan 1). Informasi                                 geographical areas which located in Jakarta
       segmen berdasarkan daerah geografis adalah                                       (Note 1). Information segment based on
       sebagai berikut:                                                                 geographical area were as follows:

                                                                                                               30 Juni/                31 Desember/
                                                                                                            June 30, 2023            December 31, 2022
                                                                                                                 Rp                         Rp

        Aset/Assets
         Konstruksi/Constructions
         Divisi Infrastruktur II/ Division Infrastructure II - Jakarta                                        27.750.280.478.716         36.728.409.181.593
         Divisi Infrastruktur I/ Division Infrastructure I - Jakarta                                          14.020.137.164.381         13.942.897.490.768
         Divisi Gedung/ Division Building - Jakarta                                                            6.481.548.084.243          6.761.856.278.285
         Divisi Infrastruktur III/ Division Infrastructure III - Jakarta                                      28.315.372.941.381          7.291.602.532.237
         Divisi Luar Negeri/ Division Overseas - Jakarta                                                         768.757.765.798             99.193.273.570
                                                                                                              77.336.096.434.519         64.823.958.756.453
         Properti/ Property
         WKR - Jakarta                                                                                         6.090.607.042.316          5.805.123.054.207
                                                                                                               6.090.607.042.316          5.805.123.054.207

         Kantor Pusat/ Head Office - Jakarta                                                                  58.997.177.237.261         59.851.366.893.690
                                                                                                              58.997.177.237.261         59.851.366.893.690
         Beton Precast/ Precast
         WBP - Jakarta                                                                                         5.517.717.480.175          6.882.077.282.335
                                                                                                               5.517.717.480.175          6.882.077.282.335
         Infrastruktur Lainnya/ Other Infrastructure
         WKI - Jakarta                                                                                           820.732.278.160            966.204.650.981
                                                                                                                 820.732.278.160            966.204.650.981
         Jalan Tol/ Toll Road
         WTR - Jakarta                                                                                        64.789.554.149.855         59.271.666.492.780
                                                                                                              64.789.554.149.855         59.271.666.492.780
         Jumlah Sebelum Eliminasi/ Total Before Elimination                                                  213.551.884.622.286       197.600.397.130.446
         Eliminasi/ Elimination                                                                            (117.231.152.974.544)       (99.368.080.501.600)
        Jumlah Setelah Eliminasi/ Total After Elimination                                                     96.320.731.647.742         98.232.316.628.846


                                                                                                              30 Juni/                 31 Desember/
                                                                                                           June 30, 2023             December 31, 2022
                                                                                                                Rp                          Rp
        Liabilitas dan Ekuitas/ Liabilities and Equities
         Konstruksi/Constructions
         Divisi Infrastruktur II/ Division Infrastructure II - Jakarta                                       27.750.280.478.716         36.728.409.181.593
         Divisi Infrastruktur I/ Division Infrastructure I - Jakarta                                         14.020.137.164.381         13.942.897.490.768
         Divisi Gedung/ Division Building - Jakarta                                                           6.481.548.084.243          6.761.856.278.285
         Divisi Infrastruktur III/ Division Infrastructure III - Jakarta                                     28.315.372.941.381          7.291.602.532.237
         Divisi Luar Negeri/ Division Overseas - Jakarta                                                        768.757.765.798             99.193.273.570
                                                                                                             77.336.096.434.519         64.823.958.756.453
         Properti/ Property
         WKR - Jakarta                                                                                         6.090.607.042.316         5.805.123.054.207
                                                                                                               6.090.607.042.316         5.805.123.054.207

         Kantor Pusat - Jakarta                                                                              58.997.177.237.261         59.851.366.893.690
                                                                                                             58.997.177.237.261         59.851.366.893.690
         Beton Precast/ Precast
         WBP - Jakarta                                                                                         5.517.717.480.175         6.882.077.282.335
                                                                                                               5.517.717.480.175         6.882.077.282.335
         Infrastruktur Lainnya/ Other Infrastructure
         WKI - Jakarta                                                                                          820.732.278.160            966.204.650.981
                                                                                                                820.732.278.160            966.204.650.981
         Jalan Tol/ Toll Road
         WTR - Jakarta                                                                                       64.789.554.149.855         59.271.666.492.780
                                                                                                             64.789.554.149.855         59.271.666.492.780
         Jumlah Sebelum Eliminasi/ Total Before Elimination                                                  213.551.884.622.286       197.600.397.130.446
         Eliminasi/ Elimination                                                                            (117.231.152.974.544)       (99.368.080.501.600)
        Jumlah Setelah Eliminasi/ Total After Elimination                                                    96.320.731.647.742         98.232.316.628.846




                                                                           202
Page 206
                                                                                        The original consolidated financial statements included herein are in
                                                                                                                                   the Indonesian language.


 PT WASKITA KARYA (PERSERO) TBK                                                                  PT WASKITA KARYA (PERSERO) TBK
 DAN ENTITAS ANAK                                                                                            AND ITS SUBSIDIARIES
 CATATAN ATAS LAPORAN KEUANGAN                                                              NOTES TO THE INTERIM CONSOLIDATED
 KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                                        FINANCIAL STATEMENTS AS OF JUNE 30, 2023
 31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                               AND DECEMBER 31, 2022 AND FOR THE SIX
 ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                                      MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
 (2022 – DIAUDIT) – Lanjutan                                                                          (2022 – AUDITED) – Continued
 (Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                              (Expressed in full Rupiah amount, unless otherwise stated)

                                                                                                                        30 Juni/ June 30,
                                                                                                                 2023                           2022
                                                                                                                  Rp                             Rp
        Pendapatan Usaha/Sales
         Konstruksi/Constructions
         Divisi Infrastruktur II/ Division Infrastructure II - Jakarta                                         1.288.244.525.495             2.671.588.484.785
         Divisi Gedung/ Division Building - Jakarta                                                              729.315.313.946               605.415.619.539
         Divisi Infrastruktur III/ Division Infrastructure III - Jakarta                                         976.138.234.760               162.374.347.571
         Divisi Luar Negeri/ Division Overseas - Jakarta                                                         169.286.099.813                51.478.416.000
         Divisi Infrastruktur I/ Division Infrastructure I - Jakarta                                             657.568.354.508               968.399.306.402
         WTR - Jakarta                                                                                         1.237.956.538.269             1.844.784.832.869
                                                                                                               5.058.509.066.791             6.304.041.007.166
        Properti/ Property
        WKR - Jakarta                                                                                            129.178.792.028               138.080.390.882
                                                                                                                 129.178.792.028               138.080.390.882

        Kantor Pusat - Jakarta                                                                                     6.752.747.330                 2.665.668.745
                                                                                                                   6.752.747.330                 2.665.668.745
        Beton Precast/ Precast
        WBP - Jakarta                                                                                            641.678.386.965               743.788.908.273
                                                                                                                 641.678.386.965               743.788.908.273
        Infrastruktur Lainnya/ Other Infrastructure
        WKI - Jakarta                                                                                             56.637.697.501                54.996.183.342
                                                                                                                  56.637.697.501                54.996.183.342
        Jalan Tol/ Toll Road
        WTR - Jakarta                                                                                             548.373.867.905               459.556.621.089
                                                                                                                  548.373.867.905               459.556.621.089
         Jumlah Sebelum Eliminasi/ Total Before Elimination                                                     6.441.130.558.520             7.703.128.779.497
         Eliminasi/ Elimination                                                                               (1.168.458.135.226)           (1.612.747.457.341)
        Jumlah Setelah Eliminasi/ Total After Elimination                                                       5.272.672.423.294             6.090.381.322.156


53. PERKARA HUKUM                                                                    53. LEGAL CASES

   1.   Perkara Gugatan Melawan Hukum Proyek Tol                                        1.    Lawsuits Against the Law of the Becakayu Toll
        Becakayu                                                                              Road Project

        Roswinawaty Sitompul mengajukan gugatan ke                                            Roswinawaty Sitompul filed a lawsuit with
        Pengadilan Negeri Jakarta Timur dengan Perkara                                        the East Jakarta District Court           with
        No. 502/Pdt.G/2018/PN.Jkt.Tim dengan tergugat:                                        Case No. 502/Pdt.G/2018/PN.Jkt.Tim with
                                                                                              the defendant:
        −       Ahli Waris Alm H Asmawih (Tergugat I)                                         − The Heir of Alm H Asmawih (Defendant I)
        −       Kementrian PUPR (Tergugat II)                                                 − Ministry of PUPR (Defendant II)
        −       Pemerintah Provinsi DKI Jakarta Cq Panitia                                    − DKI Jakarta Provincial Government Cq Land
                Pengadaan Tanah untuk Kepentingan Umum                                           Procurement Committee for Public Interest
                (Tergugat III)                                                                   (Defendant III)
        −       Perusahaan Umum Jasa Tirta II (Tergugat IV)                                   − Jasa Tirta II Public Company (Defendant IV)
        −       Badan Pertanahan Nasional RI (Tergugat V)                                     − Indonesian National Land Agency (Defendant
                                                                                                 V)
        −       Pemprov Jakarta Cq Kecamatan Makasar                                          − Jakarta Provincial Government Cq Makasar
                (Tergugat VI)                                                                    District (Defendant VI)
        −       Pemprov Jakarta Cq Kelurahan Cipinang                                         − Jakarta Provincial Government Cq Cipinang
                (Tergugat VII)                                                                   Village (Defendant VII)
        −       Perusahaan (Tergugat VIII)                                                    − The Company (Defendant VIII)

        Nilai   Gugatan                    yang           diajukan         sebesar            The value of lawsuit                  filed    amounting to
        Rp6.428.796.000.                                                                      Rp6,428,796,000.

        Pada tanggal 25 November 2021 diterima                                                On November 25, 2021, a Notice of Cassation
        Pemberitahuan Pernyataan Kasasi dan Memori                                            Statement and a Memorandum of Cassation was
        Kasasi terkait perkara a quo.                                                         received regarding the a quo case.

        Pada tanggal 7 Desember 2021 telah diterima relaas                                    On December 7, 2021, it has been accepted that
        penyerahan kontra memori kasasi atas perkara a                                        the submission of the counter memorandum of
        quo.                                                                                  cassation for the a quo case has been received.
        Sampai dengan tanggal pelaporan Perusahaan                                            As of the reporting date, the Company is still
        masih memonitor putusan kasasi.                                                       monitoring cassation decision.



                                                                               203
Page 207
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

  2.   Perkara Wanprestasi Bank Jatim dengan Asuransi               2.   Case of Default Bank Jatim with Pan Pacific
       Pan Pacific Insurance                                             Insurance Insurance

       PT    Bank      Pembangunan   Daerah    Jawa                      PT Bank Pembangunan Daerah Jawa Timur Tbk
       Timur     Tbk     mengajukan   gugatan    ke                      filed a lawsuit to Surabaya District Court with
       Pengadilan Negeri Surabaya dengan Perkara                         Case No. 1048/Pdt.G/2019/PN.Sby with the
       No. 1048/Pdt.G/2019/PN.Sby dengan Perusahaan                      Company as Co-Defendant II.
       sebagai Turut Tergugat II.

       Nilai Gugatan kerugian materiil yang diajukan                     The value of the claim for material loss
       sebesar Rp109.254.590.243.                                        amounting to Rp109,254,590,243.

       Putusan Pengadilan Negeri Surabaya Nomor                          The decision of the Surabaya District Court
       1048/Pdt.G/2019/PN.Sby yang dibacakan pada                        Number 1048/Pdt.G/2019/PN.Sby which was
       sidang tanggal 26 Oktober 2020 menyatakan                         read out at the hearing on October 26, 2022
       Tergugat telah melakukan Wanprestasi dan                          stated that the Defendant had defaulted and
       menghukum           Tergugat      membayar                        ordered      the    Defendant    to     pay
       Rp207.754.590.243                                                 Rp207,754,590,243

       Putusan Banding Pengadilan Tinggi tanggal 14 Juni                 Decision of the High Court of Appeal dated 14
       2021 diterima relaas Pemberitahuan Putusan                        June 2021 was accepted by the release of
       Banding perkara a quo. Pada tanggal 29 November                   Notification of the Appeal Decision in the a quo
       2021 diterima relaas pemberitahuan penyerahan                     case. On November 29, 2021, a notification was
       kontra memori kasasi beserta memori kasasi atas                   received regarding the submission of the counter
       perlara a quo.                                                    memorandum of cassation along with the
                                                                         memorandum of cassation for the a quo case.

        Isi putusan kasasi adalah sebagai berikut:                       The content of the cassation decision is as
                                                                         follows:
           - Menolak permohonan kasasi dari pemohon                       - Rejected the cassation request from the
             kasasi PT Pan Pacific Insurance;                                 cassation applicant PT Pan Pacific Insurance;
           - Menghukum       Pemohon       Kasasi    untuk                - Ordered the Cassation Petitioner to pay the
             membayaran biaya perkara dalam tingkat kasasi                    court fees at this cassation level for
             ini sejumlah Rp500.000                                           Rp500,000

  3.   Perkara Gugatan Perbuatan Melawan Hukum Ganti                3.   Lawsuit Against the Law on Unlawful Indemnity
       Rugi atas Pembangunan Proyek Jalan Tol                            for the Construction of the Cimanggis Cibitung II
       Cimanggis Cibitung II                                             Toll Road Project

       PT Agung Graha Persada Utama mengajukan                           PT Agung Graha Persada Utama filed a lawsuit
       gugatan ke Pengadilan Negeri Jakarta Selatan                      to Jakarta Selatan District Court with Case No.
       dengan Perkara No. 641/Pdt.g/2020/PN.Jkt.Sel                      641/Pdt.g/2020/PN.Jkt.Sel with the Company as
       dengan Perusahaan sebagai Turut Tergugat II.                      co-Defendant II.

       Pada tanggal 11 Oktober 2021 diadakan sidang                      On October 11, 2021, a session will be held with
       dengan agenda Pembacaan Putusan Sela yang                         the agenda for Reading the Interlocutory
       amarnya sebagai berikut:                                          Decision, the order of which is as follows:

       -      Mengabulkan Eksepsi Tergugat II tentang                     -     Granted Defendant II's Exception regarding
              kompetensi relatif.                                               relative competence.
       -      Menyatakan bahwa Pengadilan Negeri Jakarta                  -     To declare that the South Jakarta District
              Selatan tidak berwenang secara relatif untuk                      Court has no relative authority to examine
              memeriksa dan mengadili Perkara a quo.                            and adjudicate the a quo case.
       -      Menghukum Penggugat untuk membayar biaya                    -     Sentencing the Plaintiff to pay the costs
              yang timbul dari Perkara ini sejumlah                             arising from this case amounting to
              Rp3.708.800.                                                      Rp3,708,800.

       Telah diterima Salinan Putusan Resmi Pengadilan                   A copy of the official decision of the District Court
       Negeri atas Perkara a quo pada tanggal                            on the a quo case has been received on
       3 November 2021.                                                  November 3, 2021.


                                                          204
Page 208
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

       Pada tanggal 6 Juli 2022 diterima relaas                          On July 6, 2022, a notification of the submission
       pemberitahuan penyampaian Memori Banding atas                     of a Memorandum of Appeal for the a quo case
       Perkara a quo.                                                    was received.

       Pada tanggal 2 Februari 2023 agenda pembacaan                     On February 2, 2023, the agenda for reading
       Putusan Banding dengan amar sebagai berikut:                      the Appeal Decision is as follows:

         - Menerima       permohonan     banding    dari                    - Received the original Appellant's appeal
           Pembanding semula Penggugat;                                       from the Plaintiff;
         - Menguatkan putusan Pengadilan Negeri Jakarta                     - Strengthening the decision of the South
           Selatan Nomor 641/Pdt.G/2020/PN Jkt.Sel                            Jakarta      District      Court      Number
           tanggal 11 Oktober 2021;                                           641/Pdt.G/2020/PN Jkt.Sel dated 11
         - Menghukum Pembanding semula Penggugat                              October 2021;
           untuk membayar biaya perkara dalam kedua                         - Sentenced the plaintiff's original appellant to
           tingkat peradilan, yang dalam tingkat banding                      pay the costs of the case at both court levels,
           sebesar Rp150.000.                                                 which at the appeal level amounted to
                                                                              Rp150,000.

  4.   Perkara Perdata Gugatan Perbuatan Melawan                    4.   Civil Lawsuit Case against the Law in
       Hukum dalam pembangunan Proyek Ruas Jalan Tol                     the construction of the Tebing Tinggi - Kuala
       Tebing Tinggi – Kuala Tanjung                                     Tanjung Toll Road Project

       Bambang Irwansyah dkk mengajukan gugatan ke                       Bambang Irwansyah et al filed a lawsuit to
       Pengadilan Negeri Kisaran dengan Perkara                          Kisaran    District  Court     with  Cases
       No. 2/Pdt.G/2021/PN.Kis dengan Perusahaan                         No. 2/Pdt.G/2021/PN.Kis with the Company as
       sebagai Tergugat. Nilai Gugatan materiil yang                     Defendant. The value of the material claim
       diajukan sebesar Rp42.517.386.977 dan imateriil                   amounting to Rp42,517,386,977 and imaterial
       sebesar Rp17.000.000.000.                                         amounting to Rp17,000,000,000.

       Pada tanggal 28 Oktober 2021 diadakan sidang                      On October 28, 2021, a hearing will be held with
       dengan agenda pembacaan Putusan Banding oleh                      the agenda of reading the Appeal Decision by
       Pengadilan tinggi atas Perkara a quo dengan                       the High Court on the a quo case with the
       amarnya sebagai berikut :                                         following ruling:

         -    Menerima pemohonan banding yang diajukan                         -     Received the appeal filed by the original
              oleh Para Pembanding semula para                                       Comparators of the Plaintiffs.
              Penggugat.
         -    Menguatkan Putusan Pengadilan Negeri                             -     Strengthening the Decision of the
              Kisaran Nomor : 2/Pdt.G/2021/PN.Kis tanggal                            Kisaran      District  Court    Number:
              5 Juli 2021 yang dimohonkan Banding.                                   2/Pdt.G/2021/PN.Kis dated July 5,
                                                                                     2021, which is being appealed.
         -    Menghukum Para Pembanding semula para                            -     Sentencing the original Appellants of
              Penggugat untuk membayar biaya perkara                                 the Plaintiffs to pay court fees at both
              dalam kedua tingkat pengadilan yang dalam                              levels of court which in the appeal level
              tingkat  banding     ditetapkan  sejumlah                              was     set      at   a    number      of
              Rp150.000.                                                             Rp150,000.

       Pada tanggal 13 Januari 2022 telah disampaikan                    On January 13, 2022, a memorandum of
       kontra Memori Kasasi atas perkara a quo.                          cassation was submitted against the a quo case.

       Pada tanggal 26 Januari 2022 masih dalam tahap                    On January 26, 2022, it is still in the process of
       pengiriman berkas kasasi dari kepada seluruh pihak.               sending the cassation file from all Parties..

  5.   Perkara Gugatan Perdata Wanprestasi pada Proyek              5.   Civil Default Case on the Brooklyn Apartment
       Apartment Brooklyn                                                Project

       Heliana Ghozali mengajukan gugatan ke Pengadilan                  Heliana      Ghozali    filed  a     lawsuit    to
       Negeri      Tangerang       dengan         Perkara                the Tangerang District Court with the case
       No. 864/Pdt.G/2021/PN.Tng dengan Perusahaan                       No. 864/Pdt.G/2021/PN.Tng with the Company
       sebagai Tergugat. Nilai Gugatan materiil yang                     as the Defendant. The value of the material
       diajukan sebesar Rp4.800.000 dan imateriil sebesar                lawsuit filed is Rp4,800,000 and the immaterial is


                                                          205
Page 209
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

       Rp200.000.000. Pada tanggal 22 Desember 2021                      Rp200,000,000. On December 22, 2021,
       diadakan sidang dengan agenda Duplik.                             a hearing will be held with a Duplic agenda.

       Pada tanggal 29 Juni 2022 diterima Relaas                         On June 29, 2022, the notice of submission of
       Pemberitahuan Penyampaian Banding atas perkara                    appeal was received on the a quo case.
       a quo.

       Pada tanggal 8 Agustus 2022 telah diserahkan                      On August 8, 2022, a Counter Memorandum of
       Kontra Memori banding atas perkara a quo.                         Appeal was submitted for the a quo case.

       Pada tanggal 10 Agustus 2022 diadakan sidang                      On August 10, 2022 a hearing was held with
       dengan agenda pembacaan putusan Banding atas                      the agenda for reading the decision on
       Perkara a quo dengan amarnya sebagai berikut:                     the appeal against the a quo case with
                                                                         the following orders:
       -   Menerima permohonan Banding dari Pembanding                    - Received an appeal from the plaintiff's
           semula Penggugat.                                                  original appellant.
                                                                          - Strengthening         the Decision   of
       -   Menguatkan     Putusan   Pengadilan    Negeri
                                                                              the Tangerang District Court Number
           Tangerang     Nomor    864/Pdt.g/2021/PN.Tng
                                                                              864/Pdt.g/2021/PN.Tng dated May 25,
           tanggal 25 Mei 2022.
                                                                              2022.

  6.   Perkara Perbuatan Melawan Hukum Proyek PLTU                  6.   Cases of Unlawful Acts of PLTU Kaltim Project -
       Kaltim - GI New Balikpapan                                        GI New Balikpapan

       Idris Candra mengajukan gugatan ke Pengadilan                     Idris Candra filed a lawsuit to the Balikpapan
       Negeri      Balikpapan      dengan        Perkara                 District      Court        with   Case      No.
       No. 245/Pdt.G/2021/PN.Bpp dengan Perusahaan                       245/Pdt.G/2021/PN.Bpp with the Company as
       sebagai Tergugat. Nilai Gugatan materiil yang                     the Defendant. The value of the material lawsuit
       diajukan sebesar Rp43.762.000.000 dan imateriil                   filed is Rp43,762,000,000 and the immaterial is
       sebesar     Rp150.000.000.      Pada      tanggal                 Rp150,000,000. On December 15, 2021, the
       15 Desember 2021 diterima relaas panggilan sidang                 report for the first court summons was received
       pertama yang diadakan pada tanggal 23 Desember                    which was held on December 23, 2021 with the
       2021 dengan agenda pemanggilan para pihak.                        agenda of calling the parties.

       Pada tanggal 7 Desember 2022 diadakan sidang                      On December 7, 2022 a hearing was held with
       dengan agenda pembacaan putusan dengan                            the agenda for reading the decision with
       amarnya sebagai berikut :                                         the following orders:
       -   Mengabulkan Eksepsi Tergugat I dan Tergugat                    -   Granted the exceptions of Defendant I and
           II perihal gugatan Penggugat Kurang Pihak                          Defendant II regarding the lawsuit of
           (Plurium Litis Consortium).                                        the Less Party Plaintiff (Plurium Litis
                                                                              Consortium).

  7.   Perkara Perbuatan Melawan Hukum Proyek                      7.    Cases of Unlawful Acts of New Balikpapan -
       Pembangunan Jaringan SUTT 150 kV New                              PLTU Karingau 150 kV SUTT Network
       Balikpapan - PLTU Karingau                                        Development Project

       Robby Suleman Runtu dkk mengajukan gugatan ke                     Robby Suleman Runtu et al filed a lawsuit to
       Pengadilan Negeri Balikpapan dengan Perkara                       the Balikpapan District Court with Case
       No. 28/Pdt.G/2022/PN.Bpp dengan Perusahaan                        No. 28/Pdt.G/2021/PN.Bpp with the Company as
       sebagai Tergugat. Nilai Gugatan materiil yang                     the Defendant. The value of the material lawsuit
       diajukan sebesar Rp399.044.000.                                   filed is Rp399,044,000.

       Putusan Pengadilan Negeri tanggal 7 September                     The District Court's decision on September 7,
       2022 amarnya sebagai berikut:                                     2022 ruled as follows:

       Dalam Eksepsi                                                     In Exception
       -   Menolak eksepsi Tergugat dan Turut Tergugat I                 -    Rejected the exceptions of the Defendant
           untuk seluruhnya;                                                  and Co-Defendant I in their entirety;




                                                          206
Page 210
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

       Dalam Pokok Perkara                                               In the Matter
       -   Mengabulkan Gugatan Penggugat untuk                           -    Granted the Plaintiff's lawsuit in part;
           sebagian;
       -   Menyatakan sah dan mengikat Surat Perjanjian                   -     Declare the valid and binding Letter of
           tertanggal 18 Februari 2021 dan Surat                                Agreement dated February 18, 2021 and
           Perjanjian Pembayaran tertanggal 22 Juni 2021;                       the Payment Agreement dated June 22,
       -   Menyatakan Tergugat melakukan Wanprestasi;                           2021;
       -   Menghukum Tergugat melunasi pembayaran                         -     Declare the Defendant to have defaulted;
           sisa hutang sebesar Rp2.100.000.000 kepada                     -     Punish      the  Defendant      in   paying
           Penggugat;                                                           the remaining debt of Rp2,100,000,000 to
                                                                                the Plaintiff;
       -    Menghukum Turut Tergugat I dan Turut                          -     Punish Co-Defendant I and Co-Defendant II
            Tergugat II untuk tunduk dan patuh terhadap                         to submit and comply with this decision;
            putusan ini;
       -    Menolak gugatan Penggugat selain dan                          -     Rejecting the Plaintiff's lawsuit other than
            selebihnya;                                                         and the rest;

       Pada tanggal 17 November 2022 diadakan sidang                     On November 17, 2022 a hearing was held with
       dengan agenda pembacaan putusan banding                           the agenda for reading the appeal decision with
       dengan amarnya sebagai berikut:                                   the following orders:
                                                                          - Receive appeals from the original appellant of
       -   Menerima permohonan banding dari para                            plaintiffs in the convention/defendants
           Pembanding semula para Penggugat Dalam                           in the convention;
           Konvensi/para Tergugat Dalam Rekonvensi
           tersebut;                                                         - Strengthening the Balikpapan District Court
       -   Menguatkan Putusan Pengadilan Negeri                                Decision Number 28/Pdt.G/2022/PN Bpp
           Balikpapan Nomor 28/Pdt.G/ 2022/PN Bpp                              dated 14 September 2022 which was filed for
           tanggal 14 September 2022 yang dimohonkan                           appeal.
           banding.

  8.   Perkara Perbuatan Melawan Hukum Proyek PLTM                 8.    Unlawful Acts of the Lebak Tundun PLTM Project
       Lebak Tundun

       Kaiyata mengajukan gugatan ke Pengadilan                          Kaiyata files a lawsuit to the Court The State of
       Negeri    Jakarta   Timur     dengan     Perkara                  East      Jakarta    with     the    Case    No.
       No. 174/Pdt.G/2022/PN.Jkt.Tim dengan Perusahaan                   174/Pdt.G/2022/PN.Jkt.Tim with the Company
       sebagai Tergugat. Nilai Gugatan materiil yang                     as the Defendant. The value of the material
       diajukan sebesar Rp847.788.880 dan imateriil                      lawsuit filed is Rp847,788,880 and the immaterial
       sebesar Rp10.000.000.000.                                         is Rp10,000,000,000.

       Putusan PN Jakarta Timur tanggal 6 Maret 2023,                    East Jakarta District Court Decision dated March
       amarnya adalah sebagai berikut:                                   6 2023, the order is as follows:

       -   Dalam Eksepsi: Menyatakan mengabulkan                         -      In Exception: Declare that Defendant I
           eksepsi Tergugat I;                                                  grants the exception;
       -   Dalam Pokok Perkara: Menyatakan gugatan                       -      In the Main Case: Declare that the Plaintiff's
           Penggugat tidak dapat diterima;                                      lawsuit cannot be accepted;
       -   Dalam Rekonvensi: Menyatakan gugatan                          -      In Countermeasures: Declare counterclaims
           rekonvensi dari Penggugat Rekonvensi tidak                           from the Plaintiffs against Counterclaims
           dapat diterima;                                                      cannot be accepted;
       -   Dalam Konvensi dan Rekonvensi: Menghukum                      -      In the Convention and Convention: Punish
           Penggugat Konvensi/ Tergugat Rekonvensi                              the Plaintiff of the Convention/ Reconvention
           untuk membayar biaya perkara yang hingga kini                        Defendant to pay court fees which until now
           ditetapkan sejumlah Rp6.455.000.                                     have been set at Rp6,455,000.

  9.   Perkara   Gugatan      Wanprestasi             Proyek       9.    Cases of Default for the Basko Padang Hotel
       Pembangunan Hotel Basko Padang                                    Development Project

       Perusahaan mengajukan gugatan ke Pengadilan                       The company files a lawsuit to the Court State of
       Negeri   Jakarta   Timur   dengan   Perkara                       East      Jakarta      with       the      Case
       No. 23/Pdt.G/PN.Pdg/2022 dengan Perusahaan                        No. 23/Pdt.G/PN.Pdg/2022 with the Company as

                                                          207
Page 211
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

       sebagai Tergugat. Nilai Gugatan materiil yang                     the Defendant. The value of the material lawsuit
       diajukan sebesar Rp28.941.135.946 dan imateriil                   filed is Rp28,941,135,946 and the immaterial
       sebesar Rp25.000.000.000.                                         is Rp25,000,000,000.

       Putusan Pengadilan Negeri Padang Pada tanggal 26                  Padang District Court Decision on October 26,
       Oktober 2022 dengan menghukum Tergugat untuk                      2022 by ordering the Defendant to pay
       membayar        ganti      kerugian     sebesar                   compensation      in    the     amount     of
       Rp23.111.553.117 termasuk PPN 10%.                                Rp23,111,553,117 including 10% VAT.

       Pada tanggal 11 Januari 2023 Pengadilan Negeri                    On January 11, 2023 the Padang High Court was
       Padang dalam proses penetapan Majelis Hakim dan                   in the process of determining the Panel of Judges
       penunjukan kembali Panitera pengganti.                            and reappointing a replacement Registrar.

       Pengadilan Tinggi Padang telah mengeluarkan                       The Padang High Court has issued an Appeal
       Putusan Banding dan salinan Putusan telah                         Decision and a copy of the Decision has been
       dikirimkan kepada PN Padang pada tanggal 14 Feb                   sent to the Padang District Court on 14 Feb 2023
       2023 dengan amar putusannya:                                      with the following verdict:
       -     Menerima       permohonan     banding     dari              -    Received an appeal from the Defendant's
             Pembanding semula Tergugat;                                      original Appellant;
       -     Menguatkan Putusan Pengadilan Negeri                        -    Strengthening the Decision of the Padang
             Padang tanggal 26 Oktober 2022 Nomor                             District Court dated 26 October 2022
             23/Pdt.G/2022 PN Pdg, yang dimohonkan                            Number 23/Pdt.G/2022 PN Pdg, which the
             banding tersebut;                                                appeal was filed for;
       -     Menghukum Pembanding semula Tergugat                        -    Sentenced      the     Defendant's    original
             untuk membayar biaya perkara dalam kedua                         appellant to pay the costs of the case at both
             tingkat pengadilan, yang dalam tingkat banding                   court levels, which at the appeal level was
             ditetapkan sejumlah Rp150.000.                                   set at Rp150,000

  10. Perkara Pengadilan Hubungan Industrial eks                   10. Case of the Industrial Relations Court of
      Pegawai Waskita Permasalahan PHK Pegawai                         the former Waskita Employee on the issue of
                                                                       employee layoffs

       Dwi Wahyuningsih mengajukan gugatan ke                            Dwi Wahyuningsih filed a lawsuit to the Medan
       Pengadilan Negeri Medan dengan Perkara                            District Court with Case No. 170/Pdt.Sus-
       No.     170/Pdt.Sus-PHI/2022/PN.Mdn      dengan                   PHI/2022/PN.Mdn with the Company as the
       Perusahaan sebagai Tergugat. Nilai Gugatan yang                   Defendant. The value of the lawsuit filed is
       diajukan sebesar Rp468.141.789.                                   Rp468,141,789.

       Putusan Pengadilan Hubungan Industrial Medan                      The decision of the Medan Industrial Relations
       Pada tanggal 10 Oktober 2022 dengan amarnya                       Court on October 10, 2022, with its ruling was to
       adalah mengabulkan Gugatan untuk sebagian dan                     grant the lawsuit in part and order the Defendant
       menghukum Tergugat untuk membayarkan Hak-hak                      to pay the Plaintiff's rights of Rp60,919,352.
       Penggugat dengan total sebesar Rp60.919.352.

       Pada tanggal 1 November 2022 Penggugat telah                      On November 1, 2022, the Plaintiff filed an
       mengajukan Kasasi atas Putusan Pengadilan                         appeal against the Medan Industrial Relations
       Hubungan Industrial Medan Perkara a quo.                          Court's decision on the a quo case.

       Pada tanggal 26 Januari 2023 dilakukan pengiriman                 On January 26, 2023, the Medan District Court
       Berkas Kasasi oleh Pengadilan Negeri Medan.                       sent the Cassation File.

  11. Perkara Gugatan Perdata Wanprestasi pada Proyek              11. Civil Default Case on the Brooklyn Apartment
      Apartment Brooklyn                                               Project

       Fifi Setyawati mengajukan gugatan ke Pengadilan                   Fifi   Setyawati     filed   a   lawsuit   to
       Negeri       Tangerang      dengan      Perkara                   the Tangerang District Court with the case
       No. 740/Pdt.G/2022/PN.Tng dengan Perusahaan                       No. 740/Pdt.G/2022/PN.Tng with the Company
       sebagai Tergugat. Nilai Gugatan materiil yang                     as the Defendant. The value of the material
       diajukan sebesar Rp5.243.145.035 dan imateriil                    lawsuit filed is Rp5.243.145.035 and the
       sebesar      Rp500.000.000.    Pada     tanggal                   immaterial is Rp500,000,000. On September 23,


                                                          208
Page 212
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

       23 September 2022 diadakan sidang dengan agenda                   2022, a hearing will be held with a Answer
       Jawaban.                                                          agenda.

       Pada 13 Desember 2022 Penggugat telah                             On December 13, 2022, the Plaintiff filed a
       melakukan Permohonan Banding atas Putusan                         Request for an Appeal on the Decision of the
       Pengadilan Negeri Perkara a quo.                                  District Court in the a quo case.

       Kontra Memori Banding telah disampaikan pada                      Counter Memorandum of Appeal was submitted
       24 Februari 2023.                                                 on 24 February 2023.

  12. Perkara Gugatan Perbuatan Melawan Hukum                      12. Case of Unlawful Acts of Law Land Dispute
      Sengketa Tanah Pembangunan Pabrik Patun                          Construction of Makateks Patun Factory
      Makateks

       Husain dan H. Nanring mengajukan gugatan ke                       Husain dan H.Nanring filed a lawsuit to
       Pengadilan Negeri Makassar dengan Perkara                         the Makassar District Court with the case
       No. 315/Pdt.G/2022/Pn.Mks dengan Perusahaan                       No. 315/Pdt.G/2022/Pn.Mks with the Company
       sebagai Tergugat. Penggugat menyatakan tanah                      as the Defendant. The Plaintiff stated that the
       yang disengketakan adalah milik Penggugat.                        disputed land belonged to the Plaintiff.

       Pada tanggal 16 Januari 2023 diadakan sidang                      On January 16, 2023 a hearing was held with
       dengan agenda Pembacaan Putusan Sela.                             the agenda for Reading the Interlocutory
                                                                         Decision.
       Amar Putusan Sela:                                                Interlocutory Judgement:
       -  Mengabulkan permohonan gugatan intervensi                      -    Granted the request for an intervention
          untuk masuk dalam perkara sebagai pihak                             lawsuit to enter into the case as an
          intervensi.                                                         intervening party.
       -  Menghukum Para Penggugat dan Para                              -    Sentenced the Plaintiffs and Defendants to
          Tergugat membayar biaya perkara yang                                pay court costs which amounted to nil.
          jumlahnya nihil.

  13. Perkara Gugatan Perbuatan Melawan               Hukum        13. Case of Unlawful Actions in a Land Dispute with
      Sengketa Tanah dengan Walikota Palu                              the Mayor of Palu

       Andi Endang Djanggola mengajukan gugatan ke                       Andi Endang Djanggola filed a lawsuit with
       Pengadilan     Negeri    Palu   dengan Perkara                    the Palu District Court with a case
       No. 126/Pdt.g/2022/PN.Pal dengan Perusahaan                       No. 126/Pdt.g/2022/PN.Pal with the Company as
       sebagai Tergugat. Nilai Gugatan materiil yang                     Defendant. The value of the material lawsuit filed
       diajukan sebesar Rp3.750.000.000 dan gugatan                      is Rp3,750,000,000 and the immaterial lawsuit
       imateriil sebesar Rp10.000.000.000.                               filed is Rp10,000,000,000.

       Pada tanggal 3 Maret 2023 Majelis Hakim pemeriksa                 On March 3, 2023 the Panel of Judges examining
       perkara telah mengeluarkan putusan Nomor:                         the case issued a decision Number:
       126/Pdt.G/2022/PN Palu, dengan amar putusan:                      126/Pdt.G/2022/PN Palu, with the verdict:
       -   Menyatakan eksepsi Tergugat I dapat diterima;                 -   Declare Defendant I exception acceptable;
       -   Menyatakan gugatan penggugat tidak dapat                      -   Declare the plaintiff's claim unacceptable
           diterima (NO);                                                    (NO);
       -   Menghukum penggugat untuk membayar biaya                      -    Ordered the plaintiff to pay court costs.
           perkara.

  14. Perkara Gugatan Perbuatan Melawan Hukum                      14. Case of Unlawful Acts of the Tebing Tinggi Toll
      Proyek Pembangunan Jalan Tol Tebing Tinggi –                     Road Development Project - Prapat - Sibolga
      Prapat - Sibolga

       Edy Syahputra Saragih dkk mengajukan gugatan ke                   Edy Syahputra Saragih et al filed a lawsuit with
       Pengadilan Negeri Sei Rampah dengan Perkara                       the Sei Rampah District Court with a case
       No. 55/Pdt.G/2022/PN.Srh dengan Perusahaan                        No. 55/Pdt.G/2022/PN.Srh with the Company as
       sebagai Tergugat. Nilai Gugatan materiil yang                     Defendant. The value of the material lawsuit filed
       diajukan sebesar Rp7.239.150.000 dan gugatan                      was Rp7,239,150,000 and the immaterial filed
       imateriil sebesar Rp600.000.000.                                  was Rp600,000,000.


                                                          209
Page 213
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

       Pada tanggal 26 Juni 2023 diadakan sidang dengan                  On June 26, 2023 a hearing was held with an
       agenda pembacaan kesimpulan.                                      agenda for reading the conclusions.

       Sampai dengan tanggal pelaporan Perusahaan                        As of the reporting date, the Company is still
       masih memonitor pelaksanaan sidang selanjutnya.                   monitoring the implementation of the next trial.

  15. Perkara Gugatan Melawan Hukum Proyek                         15. Case of Unlawful Acts of the Cibitung – Cilincing
      Pembangunan Jalan Tol Cibitung – Cilincing II                    II Tol Development Project

       Tio Melya mengajukan gugatan ke Pengadilan                        Tio Melya filed a lawsuit with the North Jakarta
       Negeri    Jakarta    Utara    dengan    Perkara                   District   Court     with     a     case    No.
       No. 644/Pdt.g/2022/PN.Jkt.Ut dengan Perusahaan                    644/Pdt.g/2022/PN.Jkt.Ut with the Company as
       sebagai Tergugat. Nilai Gugatan materiil yang                     Defendant. The material lawsuit filed was
       diajukan sebesar Rp7.730.828.601 dan imateriil                    Rp7,730,828,601 and the immaterial filed was
       sebesar Rp2.000.000.000.                                          Rp2,000,000,000.

       Pada tanggal 31 Mei 2023 diadakan sidang dengan                   On May 31, 2023 a hearing was held with the
       agenda pembacaan putusan Pengadilan Negeri                        agenda for reading the decision of the North
       Jakarta Utara dengan amarnya sebagai berikut :                    Jakarta District Court with the following orders:
       -   Mengabulkan Gugatan Para Penggugat untuk                      -   Granted the Plaintiffs' Claim in part;
           sebagian;                                                     -   Declare that Defendant 1 and Defendant 2
       -   Menyatakan Tergugat 1 dan Tergugat 2 telah                        have committed an unlawful act which is
           melakukan perbuatan melawan hukum yang                            detrimental to the Plaintiff;
           merugikan Penggugat;
       -   Menghukum Tergugat 2 untuk membayar ganti                     -     Sentenced Defendant 2 to pay land
           kerugian tanah atas penggunaan dan/atau                             compensation     for   the    use     and/or
           pengadaan tanah untuk Proyek Jalan Tol                              procurement of land for the Cibitung-
           Cibitung-Cilincing kepada Penggugat 1 sebesar                       Cilincing Toll Road Project to Plaintiff 1 in
           Rp7.367.497.782.                                                    the amount of Rp7,367,497,782.
       -   Menghukum Tergugat 2 untuk membayar ganti                     -     Ordered Defendant 2 to pay land
           kerugian tanah atas penggunaan dan/atau                             compensation     for   the    use     and/or
           pengadaan tanah untuk Proyek Jalan Tol                              procurement of land for the Cibitung-
           Cibitung-Cilincing kepada Penggugat 2 sebesar                       Cilincing Toll Road Project to Plaintiff 2 in
           Rp363.330.819.                                                      the amount of Rp363,330,819.

       Pada tanggal 13 Juni 2023 Permohonan Banding                      On June 13, 2023 the Appeal was filed by
       telah diajukan oleh Tergugat I dan II.                            Defendants I and II.

  16. Perkara Gugatan Perbuatan Melawan Hukum                      16. Case of Unlawful Accidents on the Kayuagung -
      Kecelakaan di Ruas Tol Kayuagung - Mesuji                        Mesuji Toll Road

       Sukandar dan dkk mengajukan gugatan ke                            Sukandar el al filed a lawsuit with the Kayuagung
       Pengadilan Negeri Kayuagung dengan Perkara                        District     Court         with        a     case
       No. 2/Pdt.G/2023/PN.Kag dengan Perusahaan                         No. 2/Pdt.G/2023/PN.Kag with the Company as
       sebagai Tergugat. Nilai Gugatan materiil yang                     Defendant. The material lawsuit filed was
       diajukan sebesar Rp1.897.242.828 dan imateriil                    Rp1,897,242,828 and the immaterial filed was
       sebesar Rp10.000.000.000.                                         Rp10,000,000,000.

       Pada tanggal 21 Juni 2023 diadakan sidang dengan                  On June 21, 2023 a trial was held with an agenda
       agenda pemeriksaan saksi.                                         for examining witnesses.
       Sampai dengan tanggal pelaporan Perusahaan                        As of the reporting date, the Company is still
       masih memonitor pelaksanaan sidang selanjutnya.                   monitoring the implementation of the next trial.

  17. Perkara Gugatan Perbuatan Melawan Hukum                      17. Lawsuit for Unlawful Accidents on the Pejagan -
      Kecelakaan di Ruas Tol Pejagan - Pemalang                        Pemalang Toll Road

       Teddy Robin mengajukan gugatan ke Pengadilan                      Teddy Robinn filed a lawsuit with the East
       Negeri    Jakarta   Timur     dengan    Perkara                   Jakarta District Court with a case No.
       No. 33/Pdt.G/2023/PN.Jkt.Tim dengan Perusahaan                    33/Pdt.G/2023/PN.Jkt.Tim with the Company as
       sebagai Tergugat. Nilai Gugatan materiil yang                     Defendant. The value of the material lawsuit filed


                                                          210
Page 214
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

       diajukan sebesar Rp560.000.000          dan imateriil             is Rp560,000,000             and     the     immaterial       is
       sebesar Rp10.000.000.000.                                         Rp10,000,000,000.

       Pada tanggal 25 Mei 2023 diadakan sidang dengan                   On May 25, 2023 a trial was held with the agenda
       agenda putusan yang amarnya sebagai berikut :                     for the decision as follows:

         -   Mengabulkan       permohonan      pencabutan                -     Granted the request for revocation of the
             perkara gugatan Nomor : 33/Pdt.G/2023/PN                          lawsuit case Number: 33/Pdt.G/2023/PN
             Jkt.Tim yang dimohonkan oleh Penggugat;                           Jkt.Tim requested by the Plaintiff;
         -   Memerintahkan Panitera Pengadilan Negeri                    -     Order the Registrar of the East Jakarta
             Jakarta Timur atau Pejabat yang ditunjuk untuk                    District Court or an official appointed to do
             itu, untuk mencatat pencabutan perkara                            so, to record the revocation of the lawsuit
             gugatan Nomor : 33/Pdt.G/2023/PN Jkt.Tim                          case Number: 33/Pdt.G/2023/PN Jkt.Tim, in
             tersebut, dalam register yang sedang berjalan;                    the ongoing register;

       Menghukum Penggugat untuk membayar biaya                          Ordered the Plaintiff to pay the court fee of
       perkara ini sebesar Rp680.000.                                    Rp680,000.

  18. Perkara Gugatan Melawan Hukum Proyek SUTT                    18. Lawsuit against the law for the New Balikpapan
      150 Kv New Balikpapan - PLTU Kariangau                           150 Kv SUTT Project - PLTU Kariangau

       Robby Suleman Runtu dkk mengajukan gugatan ke                     Robby Suleman Runtu filed a lawsuit with the
       Pengadilan Negeri Balikpapan dengan Perkara                       Balikpapan District Court with a case
       No. 53/Pdt.G/2023/PN.Bpp dengan Perusahaan                        No. 53/Pdt.G/2023/PN.Bpp with the Company as
       sebagai Tergugat. Penggugat Menyatakan Secara                     Defendant. The Plaintiff stated that legally the
       hukum kepemilikan yang di miliki oleh Para                        ownership owned by the Plaintiffs was legally
       Penggugat sah secara hukum dan berhak atas uang                   valid and entitled to compensation in the amount
       Kornpensasi sebesar Rp. 368.861.000                               of Rp368,861,000

       Pada tanggal 20 Juni 2023 diadakan sidang dengan                  On June 20 2023 a meeting was held with the
       agenda Replik.                                                    Replik agenda.

       Sampai dengan tanggal pelaporan Perusahaan                        As of the reporting date, the Company is still
       masih memonitor pelaksanaan sidang selanjutnya.                   monitoring the implementation of the next trial.

  19. Gugatan Perbuatan Melawan Hukum Proyek ITC                   19. Lawsuit on Unlawful Acts of the ITC Polonia
      Polonia Medan                                                    Medan Project

       PT ITC Polonia mengajukan gugatan ke Pengadilan                   PT ITC Polonia filed a lawsuit with the Medan
       Negeri       Medan        dengan        Perkara                   District    Court       with       a     case
       No. 279/Pdt.g/2023/PN.Mdn dengan Perusahaan                       No. 279/Pdt.g/2023/PN.Mdn with the Company
       sebagai Tergugat. Nilai Gugatan materiil yang                     as Defendant. The material claim value was
       diajukan sebesar Rp40.660.793.864 dan imateriil                   Rp40,660,793,864 and the immaterial claim was
       sebesar Rp15.000.000.000.                                         Rp15,000,000,000.

       Pada tanggal 8 Mei 2023 diadakan sidang dengan                    On May 8, 2023 a trial was held with the agenda
       agenda sidang pertama                                             for the first session

       Sampai dengan tanggal pelaporan Perusahaan                        As of the reporting date, the Company is still
       masih memonitor pelaksanaan sidang selanjutnya.                   monitoring the implementation of the next trial.

  20. Gugatan Pembatalan Putusan BANI Proyek ITC                   20. Lawsuit for Cancellation of BANI's Decision on
      Polonia Medan                                                    the ITC Polonia Medan Project

       PT ITC Polonia mengajukan gugatan ke Pengadilan                   PT ITC Polonia filed a lawsuit with the Medan
       Negeri        Medan         dengan        Perkara                 District      Court        with       a      case
       No. 326/Pdt.g/2023/PN.Mdn dengan Perusahaan                       No. 326/Pdt.g/2023/PN.Mdn with the Company
       sebagai Tergugat. PT ITC Polonia menuntut Putusan                 as Defendant. PT ITC Polonia demands
       Arbitrase No. 1371 B/Pdt.Sus-Arbt/2022 tanggal 20                 Arbitration Award No. 1371 B/Pdt.Sus-Arbt/2022
       September 2022 telah melanggar ketentuan Pasal                    dated 20 September 2022 has violated the
                                                                         provisions of Article 70 letter c Law No. 30 Year

                                                          211
Page 215
                                                                    The original consolidated financial statements included herein are in
                                                                                                               the Indonesian language.


 PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
 DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
 CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
 KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
 31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
 ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
 (2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
 (Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

         70 huruf c UU No. 30 tahun 1999 tentang Arbitrase                 1999 concerning Arbitration and Alternative
         dan Alternatif Penyelesaian Sengketa.                             Dispute Resolution.

         Pada tanggal 17 Mei 2023 diadakan sidang dengan                   On May 17, 2023 a trial was held with the agenda
         agenda sidang pertama                                             for the first session

         Sampai dengan tanggal pelaporan Perusahaan                        As of the reporting date, the Company is still
         masih memonitor pelaksanaan sidang selanjutnya.                   monitoring the implementation of the next trial.

   21. Perkara Gugatan Perbuatan Melawan               Hukum        21. Lawsuit of Unlawful Actions at Brooklyn Alam
       Apartemen Brooklyn Alam Sutera                                   Sutera Apartment

         Dr. Endrina Diah Nurmeirini mengajukan gugatan ke                 Dr. Endrina Diah Nurmeirini filed a lawsuit at
         Pengadilan Negeri Tangerang dengan Perkara                        the Tangerang District Court with a case
         No. 568/Pdt.g/2023/PN.Tng dengan Perusahaan                       No. 568/Pdt.g/2023/PN.Tng with the Company
         sebagai Tergugat. Nilai Gugatan materiil yang                     as Defendant. The material claim value was
         diajukan sebesar Rp2.516.950.245 dan imateriil                    Rp2,516,950,245 and the immaterial claim was
         sebesar Rp5.000.000.000.                                          Rp5,000,000,000.

         Pada tanggal 7 Juni 2023 Gugatan atas Perkara a                   On June 7, 2023 the lawsuit against the a quo
         quo didaftarkan ke Pengadilan Negeri Tangerang.                   case was registered with the Tangerang District
                                                                           Court.

         Sampai dengan tanggal pelaporan Perusahaan                        As of the reporting date, the Company is still
         masih memonitor pelaksanaan sidang selanjutnya.                   monitoring the implementation of the next trial.

   22. Perkara Permohonan Donny Hartanto Laksamana                  22. Donny Hartanto Laksamana's case of application
       kepada PT Waskita Karya (Persero) Tbk                            to PT Waskita Karya (Persero) Tbk

         Donny Hartanto Laksamana sebagai pemohon                          Donny Hartanto Laksamana as the applicant filed
         mengajukan permohonan Penundaan Kewajiban                         an application for Suspension of Payment of Debt
         Pembayaran       Utang     dengan        Perkara                  in a Case No. 185/Pdt.Sus/PKPU/2023/
         No.      185/Pdt.Sus/PKPU/2023/PN.Niaga.Jkt.Pst                   PN.Niaga.Jkt.Pst with the Company as
         dengan Perusahaan sebagai Termohon. Sidang                        Respondent. The first trial was held on 11 July
         pertama diadakan pada tanggal 11 Juli 2023 di PN                  2023 at the Central Jakarta PN Niaga.
         Niaga Jakarta Pusat.

54. SIFAT DAN TRANSAKSI PIHAK-PIHAK BERELASI                     54. NATURE AND TRANSACTIONS WITH RELATED
                                                                     PARTIES

    Sifat hubungan berelasi                                           Nature of relationship

    a.    Pemerintah       Republik     Indonesia     melalui         a.    The Government of the Republic of Indonesia
          Kementerian Keuangan adalah pemegang saham                        represented by the Ministry of Finance,
          utama Perusahaan.                                                 is the Company’s main shareholder.
    b.    Seluruh entitas yang dimiliki dan dikendalikan oleh         b.    All entities that are owned and controlled by
          Kementerian Keuangan Pemerintah Republik                          the Ministry of Finance of the Republic of
          Indonesia serta entitas dimana Kementerian                        Indonesia including entities where the Ministry
          Keuangan Pemerintah Republik Indonesia memiliki                   of Finance Republic of Indonesia have
          pengaruh signifikan: Badan Usaha Milik Negara                     significant influence: State-owned Enterprise
          (BUMN).                                                           (SOE).
    c.    Pihak berelasi yang pemegang saham utamanya                 c.    Related parties which main shareholder is
          sama dengan Grup.                                                 the same with the Group.
    d.    Pihak berelasi yang merupakan Perusahaan                    d.    Related parties which are associates of
          asosiasi dari entitas anak.                                       the Company’s subsidiaries.
    e.    Manajemen kunci yang meliputi anggota dewan                 e.    Key      management      personnel    includes
          Komisaris dan Direksi Perusahaan.                                 Commissioners and Directors of the Company.




                                                           212
Page 216
                                                                                                                                  The original consolidated financial statements included herein are in
                                                                                                                                                                             the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                                                                       PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                                                                                 AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                                                   NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                                                                             FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                                                                    AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                                                                           MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                                                                               (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                                                                       (Expressed in full Rupiah amount, unless otherwise stated)

   Transaksi pihak berelasi                                                                                                             Transactions with related parties

   Berikut ini adalah transaksi dengan entitas berelasi:                                                                                The following are transactions with related parties:
     Pihak-pihak Berelasi/ Related Parties                                                   Transaksi                                                                              Transactions
     PT Bank Negara Indonesia (Persero) Tbk         Kas dan Setara Kas, Investasi Jangka Pendek, Utang Bank Jangka Panjang, Bank               Cash and Cash Equivalent, Short Term Investments, Long Term Bank Loan, Bank
                                                    Garansi/LC/SKBDN                                                                           Guarantee/LC/SKBDN
     PT Bank Rakyat Indonesia (Persero) Tbk         Kas dan Setara Kas, Investasi Jangka Pendek, Utang Bank Jangka Panjang, Bank               Cash and Cash Equivalent, Short Term Investments, Long Term Bank Loan, Bank
                                                    Garansi/LC/SKBDN                                                                           Guarantee/LC/SKBDN
     PT Bank Tabungan Negara (Persero) Tbk          Kas dan Setara Kas, Utang Bank Jangka Panjang, Investasi Jangka Pendek, Utang Bank         Cash and Cash Equivalent, Long Term Bank Loan, Short Term Investments, Long Term
                                                    Jangka Pendek                                                                              Bank Loan
     PT Bank Mandiri (Persero) Tbk                  Kas dan Setara Kas, Investasi Jangka Pendek, Utang Bank Jangka Panjang, Bank               Cash and Cash Equivalent, Short Term Investments, Long Term Bank Loan, Bank
                                                    Garansi/LC/SKBDN                                                                           Guarantee/LC/SKBDN
     PT Bank Syariah Indonesia Tbk (d/h/ formerly   Kas dan Setara Kas, Supply Chain Financing                                                 Cash and Cash Equivalent, Supply Chain Financing
     PT Bank Syariah Mandiri)
     PT Bank Syariah Indonesia Tbk (d/h/ formerly   Kas dan Setara Kas, Utang Bank Jangka Panjang, Supply Chain Financing                      Cash and Cash Equivalent, Long Term Bank Loan, Supply Chain Financing
     PT Bank BNI Syariah)
     Indonesia Eximbank                             Kas dan Setara Kas, Bank Garansi/LC/SKBDN                                                  Cash and Cash Equivalent, Bank Guarantee/LC/SKBDN
     PT Bank Syariah Indonesia Tbk (d/h/ formerly   Kas dan Setara Kas, Utang Bank Jangka Panjang                                              Cash and Cash Equivalent, Long Term Bank Loan
     PT Bank BRIsyariah Tbk)
     PT Trans Jawa Paspro Jalan Tol                 Piutang Retensi, Pendapatan                                                                Retention Receivable, Revenue
     PT Jasamarga Solo Ngawi                        Piutang Lain-lain, Piutang Retensi                                                         Others Receivable, Retention Receivable
     PT Pejagan Pemalang Tol Road                   Piutang Lain-lain, Piutang Retensi                                                         Others Receivable, Retention Receivable
     PT Hutama Karya (Persero)                      Piutang Usaha, Piutang Lain-lain, Piutang Retensi, Tagihan Bruto                           Accounts Receivable, Others Receivable, Retention Receivable, Gross Amount due to from
                                                                                                                                               Customer
     PT Kertas Leces (Persero)                      Piutang Usaha                                                                              Accounts Receivable
     PT Istaka Karya (Persero)                      Piutang Usaha, Piutang Lain-lain                                                           Accounts Receivable, Others Receivable
     PT Perusahaan Listrik Negara (Persero)         Tagihan Bruto, Piutang Lain-lain, Pendapatan                                               Gross Amount due to from Customer, Others Receivable, Revenues
     KSO/JO Waskita - Arkitek Team Empat            Piutang Ventura Bersama                                                                    Joint Ventures Receivables
     KSO/JO Waskita - Adhi                          Investasi pada Ventura Bersama, Piutang Ventura Bersama                                    Investment in Joint Ventures, Joint Ventures Receivables
     KSO/JO Waskita - Wika                          Investasi pada Ventura Bersama, Piutang Ventura Bersama                                    Investment in Joint Ventures, Joint Ventures Receivables
     Waskita - HK - BRP                             Piutang Ventura Bersama, Investasi pada Ventura Bersama                                    Joint Ventures Receivables, Investment in Joint Ventures
     Waskita - Baswara Sinar Mulia                  Piutang Ventura Bersama                                                                    Joint Ventures Receivables
     KSO/JO Hutama - Waskita                        Piutang Dagang, Investasi pada Ventura Bersama                                             Trade Receivable, Investment in Joint Ventures
     PT Pembangunan Perumahan (Persero) Tbk         Piutang Dagang                                                                             Trade Receivable
     KSO/JO WKR - Asiana Senopati                   Piutang Lain-lain                                                                          Others Receivable
     PT Jasamarga Semarang Batang                   Pendapatan                                                                                 Revenues
     PT Cinere Serpong Jaya                         Tagihan Bruto, Pendapatan, Piutang Retensi, Piutang Usaha                                  Gross Amount due to from Customer, Revenues, Retention Receivable, Accounts
                                                                                                                                               Receivable
     KSO/JO WKR - Darmo Permai                      Piutang Lain-lain, Investasi pada Ventura Bersama                                          Others Receivable, Investment in Joint Ventures
     PT Prima Multi Terminal                        Piutang Lain-lain, Investasi Jangka Panjang Lainnya                                        Others Receivable, Other Long-term Investments
     PT Hutama Marga Waskita                        Tagihan Bruto, Piutang Usaha, Investasi Jangka Panjang Lainnya                             Gross Amount due to from Customer, Accounts Receivable, Other Long-term Investments
     PT Jasamarga Japek Selatan                     Piutang Usaha, Piutang Retensi, Tagihan Bruto, Pendapatan                                  Accounts Receivable, Retention Receivable, Gross Amount due to from Customer,
                                                                                                                                               Revenues
     PT Jasamarga Jalan Layang Cikampek             Piutang Retensi                                                                            Retention Receivable
     PT Angkasa Pura I (Persero)                    Tagihan Bruto, Piutang Usaha                                                               Gross Amount due to from Customer, Accounts Receivable
     PT Angkasa Pura II (Persero)                   Tagihan Bruto, Piutang Retensi, Piutang Usaha, Pendapatan                                  Gross Amount due to from Customer, Retention Receivable, Accounts Receivable,
                                                                                                                                               Revenue
     PT Sarana Multi Infrastruktur (Persero)        Lembaga Keuangan Non Bank                                                                  Loan to Financial Institution Non Bank
     KSO/JO Waskita - Brantas                       Investasi pada Ventura Bersama                                                             Investment in Joint Ventures
     KSO/JO Waskita - HK                            Investasi pada Ventura Bersama                                                             Investment in Joint Ventures
     KSO/JO Waskita - PP                            Investasi pada Ventura Bersama                                                             Investment in Joint Ventures
     KSO/JO Wika - Waskita - Nindya                 Investasi pada Ventura Bersama                                                             Investment in Joint Ventures
     KSO/JO Wika - Waskita                          Investasi pada Ventura Bersama                                                             Investment in Joint Ventures
     KSO/JO Waskita - PP - Wika                     Investasi pada Ventura Bersama                                                             Investment in Joint Ventures
     KSO/ JO Waskita - Nindya                       Investasi pada Ventura Bersama                                                             Investment in Joint Ventures
     KSO/ JO WKR - RNI                              Investasi pada Ventura Bersama                                                             Investment in Joint Ventures
     Waskita - Yodya Karya                          Investasi pada Ventura Bersama                                                             Investment in Joint Ventures
     Waskita - Wika - PP - HK                       Investasi pada Ventura Bersama                                                             Investment in Joint Ventures
     PT Dok dan Perkapalan Kodja Bahari (Persero)   Piutang Usaha                                                                              Accounts Receivable
     PT Kresna Kusuma Dyandra Marga                 Piutang Usaha, Piutang Dagang, Tagihan Bruto, Piutang Lain-lain, Piutang Retensi,          Accounts Receivable, Trade Receivable, Gross Amount due to from Customer, Others
                                                    Pendapatan, Uang Muka Kontrak Jangka Pendek, Investasi pada Ventura Bersama                Receivable, Retention Receivable, Revenues, Advances on Short-Term, Investment in Joint
                                                                                                                                               Ventures
     Perum Bulog                                    Tagihan Bruto, Pendapatan, Piutang Usaha                                                   Gross Amount due to from Customer, Revenues, Account Receivable
     PT Hakaaston                                   Piutang Dagang, Pendapatan, Utang Usaha                                                    Trade Receivable, Revenues, Accounts Payable
     PT Pelabuhan Indonesia III                     Piutang Usaha, Uang Muka Kontrak Jangka Panjang, Pendapatan                                Accounts Receivable, Advances on Long-Term, Revenue
     PT Cibitung Tanjung Priok Port Toll Ways       Tagihan Bruto, Pendapatan, Piutang Retensi, Piutang Dagang                                 Gross Amount due to from Customer, Revenues, Retention Receivable, Trade Receivable
     PT Citra Karya Jabar Tol                       Tagihan Bruto                                                                              Gross Amount due to from Customer
     PT Cimanggis Cibitung Tollways                 Piutang Usaha, Piutang Lain-lain, Piutang Retensi, Tagihan Bruto, Pendapatan, Piutang      Accounts Receivable, Others Receivable, Retention Receivable, Gross Amount due to from
                                                    Dagang                                                                                     Customer, Revenues, Trade Receivable
     Waskita - Acset                                Piutang Ventura Bersama                                                                    Joint Ventures Receivables
     PT Marga Trans Nusantara                       Piutang Retensi                                                                            Retention Receivable
     PT Rafflesia Investasi Indonesia               Piutang Lain-lain                                                                          Others Receivable
     PT Semesta Marga Raya                          Pendapatan                                                                                 Revenue
     PT Len Industri                                Utang Usaha, Utang Bruto                                                                   Accounts Payable,Short-Term Gross Amount Due to Subcontractors
     PT Krakatau Steel                              Utang Usaha                                                                                Accounts Payable
     PT Wijaya Karya Beton                          Utang Usaha, Utang Bruto                                                                   Accounts Payable,Short-Term Gross Amount Due to Subcontractors



  Rincian item yang terkait dengan transaksi pihak-pihak                                                                             The details of items associated with the related
  yang berelasi sebagai berikut:                                                                                                     parties transaction are as follows:

                                                             30 Juni/                      31 Desember/                          30 Juni/               31 Desember/
                                                          June 30, 2023                  December 31, 2022                    June 30, 2023           December 31, 2022
                                                               Rp                               Rp                                  %                        %
   Aset                                                                                                                                                                                                              Assets
    Kas dan Setara kas                                      1.654.925.763.640                 1.728.367.828.960                    1,72%                       1,76%                            Cash and Cash Equivalents
    Piutang Usaha                                           1.665.237.750.198                 1.416.358.282.935                    1,73%                       1,44%                                  Accounts Receivable
    Piutang Retensi                                         1.285.912.597.974                 1.257.150.648.923                    1,34%                       1,28%                                  Retention Receivable
    Piutang Lain-lain                                       9.076.201.817.961                 8.788.790.614.970                    9,42%                       8,95%                                     Others Receivable
    Tagihan Bruto                                           4.116.681.255.068                 6.334.181.533.279                    4,27%                       6,45%                     Gross Amount due to from Customer
    Aset Ventura Bersama                                      467.216.974.739                   722.755.606.719                    0,49%                       0,74%                                  Joint Ventures Assets


                                                                                                            213
Page 217
                                                                                                                                      The original consolidated financial statements included herein are in
                                                                                                                                                                                 the Indonesian language.


 PT WASKITA KARYA (PERSERO) TBK                                                                                                             PT WASKITA KARYA (PERSERO) TBK
 DAN ENTITAS ANAK                                                                                                                                       AND ITS SUBSIDIARIES
 CATATAN ATAS LAPORAN KEUANGAN                                                                                                         NOTES TO THE INTERIM CONSOLIDATED
 KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                                                                                   FINANCIAL STATEMENTS AS OF JUNE 30, 2023
 31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                                                                          AND DECEMBER 31, 2022 AND FOR THE SIX
 ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                                                                                 MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
 (2022 – DIAUDIT) – Lanjutan                                                                                                                     (2022 – AUDITED) – Continued
 (Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                                                                          (Expressed in full Rupiah amount, unless otherwise stated)

   Persentase di atas merupakan perbandingan dengan                                                                                     The percentage above is a comparison with
   jumlah aset.                                                                                                                         the total of assets.

                                                                      30 Juni/                 31 Desember/                         30 Juni/                     31 Desember/
                                                                   June 30, 2023             December 31, 2022                   June 30, 2023                 December 31, 2022
                                                                        Rp                          Rp                                 %                              %
   Liabilitas                                                                                                                                                                                                               Liabilities
    Utang Bank                                                     27.573.412.612.393           27.748.731.006.482                  32,70%                              33,04%                                             Bank Loan
    Uang Muka Kontrak                                                  27.226.516.265               43.892.259.333                  0,03%                               0,05%                                     Advance on Contract


   Persentase di atas merupakan perbandingan dengan                                                                                     The percentage above is a comparison with
   jumlah liabilitas.                                                                                                                   the total of liabilities.

                                                                                 30 Juni/ June 30,                                             30 Juni/ June 30,
                                                                          2023                         2022                           2023                                2022
                                                                           Rp                           Rp                             %                                   %
   Pendapatan Usaha                                                 1.445.159.197.340            2.159.704.428.524                                27,41%                            35,46%                                     Revenue


   Persentase di atas merupakan perbandingan dengan total                                                                                The percentage above is a comparison with the total
   pendapatan usaha.                                                                                                                     of revenue.

55. PERJANJIAN                                                                                                                  55. AGREEMENTS

      a.         Kontrak Konstruksi                                                                                                      a. Construction Contract

           Pada tanggal 30 Juni 2023, berikut perikatan dan                                                                                       As of June 30, 2023 following the details of
           perjanjian dalam rangka aktivitas konstruksi:                                                                                          commitments and agreement related to
                                                                                                                                                  construction activity:
                                                                                                                                                                                              Jangka Waktu/ Time Period
                                                                                                                                 Nilai Kontrak/                    Pemberi Kerja/               Mulai/         Selesai/       Keterangan/
           No.                           Nama Proyek/ Project Name                         Nomor Kontrak/ Contract Number        Contract Value                       Owner                      Start          Finish         Remark

                                                                                                                                                                                                                          Belum Jatuh Tempo/
           1     Jalan Tol Kayu Agung - Palembang - Betung Paket II Seksi 1              01/ADD/Kontrak.S1.S2.S3-WK/2022          3.979.452.524.000 PT Waskita Sriwijaya Tol                  30-Mei-16       31-Agu-23
                                                                                                                                                                                                                          Not Due Yet
                                                                                                                                                                                                                          Addendum      Dalam
           2     Pembangunan Twin Tower Makassar                                         011/PJA-PT.SCI/DB-TTM/11/2020            1.728.686.086.000 PT Sulses Citra Indah (Perseroda)         04-Nov-20       15-Apr-23   Proses/ Addendum in
                                                                                                                                                                                                                          Process
                                                                                                                                                   Kementerian Pekerjaan Umum dan
                                                                                                                                                                                                                          Belum Jatuh Tempo/
           3     Bendungan Jragung Paket 1                                               KU 03.01/Ao.8.2/IX/01/AD-IV               733.024.019.131 Perumahan Rakyat/ The Ministry of Public   14-Okt-20       31-Des-25
                                                                                                                                                                                                                          Not Due Yet
                                                                                                                                                   Works and Housing
                                                                                                                                                   Kementerian Pekerjaan Umum dan
                                                                                                                                                                                                                          Belum Jatuh Tempo/
           4     Bendungan Rukoh Paket II                                                HK.01.02/Bws1.8.3/139                     595.368.766.709 Perumahan Rakyat/ The Ministry of Public   31-Des-18       25-Nov-23
                                                                                                                                                                                                                          Not Due Yet
                                                                                                                                                   Works and Housing
                                                                                                                                                   Kementerian Pekerjaan Umum dan
                                                                                         HK.02.03/PKK/PPK.BEND.II/2021/01.Ad                                                                                              Belum Jatuh Tempo/
           5     Proyek Pembangunan Bendungan Bener Paket II                                                                       574.055.507.273 Perumahan Rakyat/ The Ministry of Public   29-Okt-18       26-Sep-24
                                                                                         d.V                                                                                                                              Not Due Yet
                                                                                                                                                   Works and Housing
                                                                                                                                                   Kementerian Pekerjaan Umum dan                                         Addendum      Dalam
           6     Bendungan Jlantah (65%)                                                 Hk.02.03-An/PPKBII/JLT/Add.9/09           570.259.894.918 Perumahan Rakyat/ The Ministry of Public    26-Jul-19      31-Des-22   Proses/ Addendum in
                                                                                                                                                   Works and Housing                                                      Process
                                                                                                                                                   Kementerian Pekerjaan Umum dan
                                                                                                                                                                                                                          Belum Jatuh Tempo/
           7     Rentang Irrigation Modernization Project                                HK.02.03-At/3.3/32/Add.VI                 553.997.191.671 Perumahan Rakyat/ The Ministry of Public   19-Agu-20       16-Feb-25
                                                                                                                                                                                                                          Not Due Yet
                                                                                                                                                   Works and Housing
                                                                                                                                                                                                                          Belum Jatuh Tempo/
           8     Tol Kataraja Zona 3                                                     DGK/PO/01/22/00001                        539.526.000.000 PT Duta Graha Karya                        20-Jan-22       11-Nov-23
                                                                                                                                                                                                                          Not Due Yet
                                                                                                                                                   Kementerian Pekerjaan Umum dan
                                                                                         HK.02.03/SNVT/PB.II         BWS   NT                                                                                             Belum Jatuh Tempo/
           9     Bendungan Mbay JOP 70%                                                                                            445.897.448.490 Perumahan Rakyat/ The Ministry of Public   19-Agu-21       31-Des-24
                                                                                         II/KB/117/VIII/2021                                                                                                              Not Due Yet
                                                                                                                                                   Works and Housing
                                                                                                                                                   Kementerian Pekerjaan Umum dan
                                                                                                                                                                                                                          Belum Jatuh Tempo/
           10    Bangunan Pengarah Bendungan Rukoh                                       PB.02.01-Bws1.8.2/676                     415.192.000.012 Perumahan Rakyat/ The Ministry of Public   09-Sep-21       27-Nov-23
                                                                                                                                                                                                                          Not Due Yet
                                                                                                                                                   Works and Housing




                                                                                                                     214
Page 218
                                                                                                                                 The original consolidated financial statements included herein are in
                                                                                                                                                                            the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                                                                          PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                                                                                    AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                                                      NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                                                                                FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                                                                       AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                                                                              MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                                                                                  (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                                                                      (Expressed in full Rupiah amount, unless otherwise stated)

                                                                                                                                                                                          Jangka Waktu/ Time Period
                                                                                                                             Nilai Kontrak/                   Pemberi Kerja/                Mulai/         Selesai/         Keterangan/
         No.                             Nama Proyek/ Project Name                       Nomor Kontrak/ Contract Number      Contract Value                      Owner                       Start          Finish           Remark
                                                                                                                                                                                                                        Addendum      Dalam
         11     PLTM BATANG TORU 3                                                     001/TGRA-WSKT/EPC/IV/2021               377.250.000.000 PT Energi Alam Sentosa                     14-Jan-21       14-Apr-23     Proses/ Addendum in
                                                                                                                                                                                                                        Process
                                                                                                                                               PPK Pelaksanaan Pembangunan Terpadu
                                                                                       HK.02.03/AMD/PPK PEL PTPIN-SNVT                                                                                                  Belum Jatuh Tempo/
         12     Perkuatan Pantai Paket 2                                                                                       310.159.833.865 Pesisir Ibukota Negara SNVT Pembangunan    03-Sep-20       31-Des-23
                                                                                       PTPIN/IV/109                                                                                                                     Not Due Yet
                                                                                                                                               Terpadu Pesisir Ibukota Negara
                                                                                                                                                                                                                        Addendum      Dalam
         13     Tol Kataraja Zona 1                                                    DGK/PO/01/22/00001                      296.823.520.348 PT Duta Graha Karya                        20-Jan-22       11-Nov-23     Proses/ Addendum in
                                                                                                                                                                                                                        Process
                                                                                                                                               Kementerian Pekerjaan Umum dan
                                                                                                                                                                                                                        Belum Jatuh Tempo/
         14     Pengendalian Banjir Sungai Loji-Banger I                               KU.03.01/Ao.7.2/KNT/07/2021             251.318.181.381 Perumahan Rakyat/ The Ministry of Public   04-Okt-21       23-Sep-23
                                                                                                                                                                                                                        Not Due Yet
                                                                                                                                               Works and Housing
                                                                                                                                                                                                                        Belum Jatuh Tempo/
         15     Jalan Tol Kayu Agung - Palembang - Betung Paket IV Seksi 2A            02/ADD/Kontrak S2.S3-WK/2022            249.050.259.246 PT Waskita Sriwijaya Tol                   20-Des-16       31-Agu-23
                                                                                                                                                                                                                        Not Due Yet
                                                                                                                                               Kementerian Pekerjaan Umum dan
                                                                                                                                                                                                                        Belum Jatuh Tempo/
         16     Proyek Makassar Sewerage B2                                            HK.02.03/Cb29.5.2/Add-IV/2021/49        237.859.989.000 Perumahan Rakyat/ The Ministry of Public   14-Nov-19       26-Jan-24
                                                                                                                                                                                                                        Not Due Yet
                                                                                                                                               Works and Housing
                                                                                                                                                                                                                        Addendum      Dalam
                                                                                       HK0201/KONTRAK/SATKER-PPP-                                PUPR Cipta Karya Balai Prasarana
         17     Jambi Sewer Sistem B2                                                                                          227.392.201.000                                            09-Okt-20       06-Mar-23     Proses/ Addendum in
                                                                                       JBI/PLP/5                                                 Permukiman Wilaya
                                                                                                                                                                                                                        Process
                                                                                                                                               Kementerian Pekerjaan Umum dan
                                                                                                                                                                                                                        Belum Jatuh Tempo/
         18     Pengaman Pantai KEK Tanjung Lesung                                     HK.02.03/09-ADD II/APBN/SP.II/2021      227.194.050.000 Perumahan Rakyat/ The Ministry of Public   30-Nov-20       15-Nov-23
                                                                                                                                                                                                                        Not Due Yet
                                                                                                                                               Works and Housing
                                                                                                                                                                                                                        Addendum      Dalam
         19     PLTM Sisira 2 x 4,9 Mw                                                 001/TGRA-WSKT/EPC/IV/2021               225.500.000.000 PT Energi Alam Sentosa                     14-Apr-21       14-Apr-23     Proses/ Addendum in
                                                                                                                                                                                                                        Process
                                                                                                                                                                                                                        Belum Jatuh Tempo/
         20     Tol Kataraja Zona 2                                                    DGK/PO/01/22/00001                      214.084.398.652 PT Duta Graha Karya                        20-Jan-22       11-Nov-23
                                                                                                                                                                                                                        Not Due Yet
                                                                                                                                               Kementerian Pekerjaan Umum dan
                                                                                                                                                                                                                        Belum Jatuh Tempo/
         21     Proyek Makassar Sewerage C2                                            HK.02.03/Cb29.5.2/Add-V/2021/02         149.830.540.000 Perumahan Rakyat/ The Ministry of Public   10-Jan-20       02-Sep-23
                                                                                                                                                                                                                        Not Due Yet
                                                                                                                                               Works and Housing


    b.        Kontrak Konsesi Pengusahaan Jalan Tol                                                                          a. b. Consession Toll Road Right Contract
                                Perusahaan/                              Ruas Tol/                       Mitra Kerja/                                   Isi Perjanjian/                               Jangka Waktu/ Period
         No
                               The Company                              Toll Section                        Partners                             Content of the Agreement                     Mulai/ Start            Selesai/ Finish


          1       PT Trans Jabar Tol (TJT)                       Ciawi - Sukabumi        Kementerian Pekerjaan Umum dan              Hak konsesi pengusahaan jalan tol selama 45                  2015                     2060
                                                                                         Perumahan Rakyat/ The Ministry of           tahun/ Toll road concession rights for 45
                                                                                         Public Works and Housing                    years
          2       PT Pemalang Batang Toll Road                   Pemalang - Batang       Kementerian Pekerjaan Umum dan              Hak konsesi pengusahaan jalan tol selama 40                  2017                     2057
                  (PBTR)                                                                 Perumahan Rakyat/ The Ministry of           tahun/ Toll road concession rights for 40
                                                                                         Public Works and Housing                    years
          3       PT Waskita Sriwijaya Tol (WST)                 Kayu Agung -            Kementerian Pekerjaan Umum dan              Hak konsesi pengusahaan jalan tol selama 45                  2017                     2062
                                                                 Palembang - Betung      Perumahan Rakyat/ The Ministry of           tahun/ Toll road concession rights for 45
                                                                                         Public Works and Housing                    years
          4       PT Waskita Bumi Wira (WBW)                     Krian - Legundi -       Kementerian Pekerjaan Umum dan              Hak konsesi pengusahaan jalan tol selama 45                  2016                     2061
                                                                 Bunder - Manyar         Perumahan Rakyat/ The Ministry of           tahun/ Toll road concession rights for 45
                                                                                         Public Works and Housing                    years
          5       PT Tol Teluk Balikpapan                        Penajam -               Kementerian Pekerjaan Umum dan              Hak konsesi pengusahaan jalan tol selama 40                  2011                     2051
                                                                 Balikpapan              Perumahan Rakyat/ The Ministry of           tahun/ Toll road concession rights for 40
                                                                                         Public Works and Housing                    years
          6       PT Tol Transjawa Paspro Jalan Tol Pasuruan -                           Kementerian Pekerjaan Umum dan              Hak konsesi pengusahaan jalan tol selama 40                  2011                     2056
                                                    Probolinggo                          Perumahan Rakyat/ The Ministry of           tahun/ Toll road concession rights for 40
                                                                                         Public Works and Housing                    years


    c.         Kontrak Lain-lain                                                                                                    c. Others Contract

         Reksa Dana Penyertaan Terbatas (RDPT)                                                                                                Reksa Dana Penyertaan Terbatas (RDPT)

         KKDM                                                                                                                                 KKDM

         Berdasarkan Akta Notaris No. 37 tanggal                                                                                              Based on the Notarial Deed No. 37 dated
         18 November 2020 oleh Ir. Nanette Cahyanie                                                                                           November 18, 2020 by Ir. Nanette Cahyanie
         Handari Adi Warsito, S.H., menyatakan bahwa WTR                                                                                      Handari Adi Warsito, SH, stated that WTR has
         telah mengalihkan atau menjual kepemilikan                                                                                           transferred or sold its share ownership in KKDM
         sahamnya di KKDM atau sebanyak 768.369.600                                                                                           or as much as 768,369,600 shares with par
         lembar    saham       dengan     harga   sebesar                                                                                     value of Rp550,000,000,000 which represents
         Rp550.000.000.000 yang mewakili 30% dari total                                                                                       30% of the total shares issued by KKDM to
         saham yang telah dikeluarkan KKDM kepada                                                                                             PT Danareksa Investment Management as
         PT Danareksa Investment Management selaku                                                                                            investment manager of RDPT, hereinafter
         manajer investasi dari RDPT yang selanjutnya                                                                                         referred to as PT Bank Central Asia Tbk as the
         diatasnamakan PT Bank Central Asia Tbk selaku                                                                                        Custodian       Bank      of    RDPT.       Thus,



                                                                                                               215
Page 219
                                                                                          The original consolidated financial statements included herein are in
                                                                                                                                     the Indonesian language.


 PT WASKITA KARYA (PERSERO) TBK                                                                   PT WASKITA KARYA (PERSERO) TBK
 DAN ENTITAS ANAK                                                                                             AND ITS SUBSIDIARIES
 CATATAN ATAS LAPORAN KEUANGAN                                                               NOTES TO THE INTERIM CONSOLIDATED
 KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                                         FINANCIAL STATEMENTS AS OF JUNE 30, 2023
 31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                                AND DECEMBER 31, 2022 AND FOR THE SIX
 ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                                       MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
 (2022 – DIAUDIT) – Lanjutan                                                                           (2022 – AUDITED) – Continued
 (Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                               (Expressed in full Rupiah amount, unless otherwise stated)

        Bank Kustodian dari RDPT. Dengan demikan porsi                                           the share of WTR ownership in KKDM becomes
        kepemilikan WTR di KKDM menjadi 70%.                                                     70%.

        Pemegang saham sepakat bahwa pengelolaan                                                 Shareholders agree that the management of
        KKDM dikelola secara bersama oleh RDPT dan WTR                                           KKDM managed jointly by RDPT and WTR in
        sesuai dengan Perubahan Pertama atas Perjanjian                                          accordance with the First Amendment on
        antar Pemegang Saham PT KKDM tanggal 17                                                  the Agreement between the shareholders of
        November 2020.                                                                           PT KKDM Marga on November 17, 2020.

56. MANAJEMEN RISIKO KEUANGAN                                                         56. FINANCIAL RISKS MANAGEMENT

   Dalam pengelolaan keuangan, Grup telah melakukan                                        In financial management, the Group has conducted
   analisa risiko terhadap persaingan dan ketidakpastian                                   a risk analysis on competition and uncertainties that
   yang dapat berpengaruh pada aset keuangan dan                                           could affect the financial assets and financial
   liabilitas keuangan sebagai berikut:                                                    liabilities as follows:

   a. Klasifikasi Aset dan Liabilitas Keuangan                                             a.    Classification        of    Financial           Assets           and
                                                                                                 Liabilities

       Perbedaan nilai wajar dengan nilai tercatat pada                                          The difference between the fair value and
       30 Juni 2023 dan 31 Desember 2022 tidak signifikan.                                       the carrying value at June 30, 2023 and
                                                                                                 December 31, 2022 was not significant.

                                                                    30 Juni/             31 Desember/
                                                                 June 30, 2023         December 31, 2022
                                                                      Rp                      Rp
      Aset Keuangan - pada                                                                                                                          Financial Assets- at
        Biaya Perolehan diamortisasi                                                                                                                 Amortiozed Cost
        Kas dan Setara Kas                                        1.724.079.213.820       2.221.541.281.141                               Cash and Equivalents Cash
        Kas yang Dibatasi Penggunaannya                           4.941.020.399.324       6.852.531.796.345                                           Restricted Cash
        Investasi Jangka Pendek                                       8.448.200.000           8.448.200.000                                    Short-Term Investments
        Piutang Usaha                                             2.153.839.885.494       1.867.294.205.719                                       Accounts Receivable
        Piutang Retensi                                           1.535.611.621.928       1.463.752.471.746                                      Retention Receivable
        Piutang Lain-lain                                         9.396.593.666.800       9.104.241.366.874                                         Other Receivables
        Piutang Ventura Bersama                                     238.610.627.020         248.477.981.675                                Joint Ventures Receivables
        Tagihan Bruto kepada Pengguna Jasa                        5.976.851.489.682       7.877.664.742.737                       Gross Amount Due from Customers
        Aset Keuangan atas Proyek Konsesi                           326.364.664.445         338.400.419.807                  Financial Assets from Concession Project
      Aset Keuangan yang Dimiliki untuk diperdagangkan                                                                                    For Trading Financial Assets
        Investasi Jangka Panjang Lainnya                           869.738.189.820          869.738.189.820                              Other Long-Term Investments
      Jumlah                                                     27.171.157.958.333      30.852.090.655.864                                                         Total

      Liabiltas Keuangan - pada                                                                                                                  Financial Liabilities- at
        Biaya perolehan diamortisasi                                                                                                                    Amortized cost
        Utang Usaha                                               7.179.063.756.744       7.449.149.336.334                                         Accounts Payables
        Utang Bruto Subkontraktor                                 1.655.302.986.086       2.142.706.140.879                        Gross Amount Due to Third Parties
        Utang Bank                                               47.812.820.666.050      47.563.432.430.672                                                   Bank Loan
        Utang Lembaga Keuangan Non-Bank                           5.355.373.249.169       4.538.846.968.540                     Loan to Financial Institution Non-Bank
        Biaya yang Masih Harus Dibayar                            1.645.385.484.033       1.037.950.981.271                                         Accrued Expenses
        Utang Ventura Bersama                                       974.810.132.968       1.001.768.560.417                                     Joint Venture Payable
        Utang Obligasi                                           10.669.264.832.165      10.659.386.827.469                                              Bonds Payable
        Surat Utang Jangka Menengah                                 725.000.000.000         725.000.000.000                                       Medium Term Notes
        Utang Lain-lain - Jangka Panjang                          1.615.730.914.845       1.557.883.427.681                               Other Payables - Long Term
      Jumlah                                                     77.632.752.022.060      76.676.124.673.263                                                          Total


   b. Tujuan dan                  Kebijakan          Manajemen      Risiko                b.     Financial Risk Management Objectives and
      Keuangan                                                                                   Policies

       Bisnis Grup mencakup aktivitas pengambilan risiko                                          The Group's business includes risk-taking
       dengan sasaran tertentu dengan pengelolaan yang                                            activities with specific objectives with
       profesional. Fungsi utama dari manajemen risiko Grup                                       professional management. The main function of
       adalah untuk mengidentifikasi seluruh risiko kunci,                                        the Group's risk management is to identify all
       mengukur risiko-risiko ini dan mengelola posisi risiko.                                    key risks, measure these risks and manage risk
       Grup secara rutin menelaah kebijakan dan sistem                                            positions. The Group regularly reviews policies
       manajemen risiko untuk menyesuaikan dengan                                                 and risk management system to adjust to
       perubahan di pasar, produk dan praktek pasar terbaik.                                      changes in markets, products and best market
                                                                                                  practices.



                                                                          216
Page 220
                                                                        The original consolidated financial statements included herein are in
                                                                                                                   the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                   PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                             AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                         FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                       MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                           (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)               (Expressed in full Rupiah amount, unless otherwise stated)

      Grup mendefinisikan risiko keuangan sebagai                              The Group defines financial risk as the
      kemungkinan kerugian atau laba yang hilang, yang                         possibility of loss or lost profit, caused by both
      disebabkan oleh faktor internal maupun faktor                            internal and external factors that potentially
      eksternal yang berpotensi negatif terhadap                               have a negative impact on the achievement of
      pencapaian tujuan Grup.                                                  Group goals.

      Tujuan Grup dalam mengelola risiko keuangan adalah                       The purpose of the Group in managing financial
      untuk mencapai keseimbangan yang sesuai antara                           risks is to achieve an appropriate balance
      risiko dan tingkat pengembalian serta meminimalisasi                     between risk and returns and minimize potential
      potensi efek memburuknya kinerja keuangan Grup.                          adverse effects of the Group's financial
                                                                               performance.

      Risiko keuangan utama yang dihadapi Grup adalah                         The main financial risks facing the Group are
      risiko kredit, risiko suku bunga, risiko likuiditas, risiko             credit risk, interest rate risk, liquidity risk, foreign
      nilai tukar mata uang asing dan risiko perubahan                        currency exchange rates and the risk of changes
      kebijakan pemerintah, kondisi ekonomi dan sosial                        in government policy, socio-economic and
      politik. Perhatian atas pengelolaan risiko ini telah                    political     conditions.     Attention       to     risk
      meningkat           secara     signifikan         dengan                management has increased significantly and
      mempertimbangan perubahan dan volatilitas pasar                         considered changer and volatility of financial
      keuangan di Indonesia dan internasional.                                markets in Indonesia and internationally.

      (i)   Risiko Kredit                                                     (i) Credit Risk

            Risiko kredit adalah kerugian yang timbul dari                         Credit risk is the loss arising from customers
            pelanggan yang gagal memenuhi kewajiban                                who fail to meet their contractual obligations.
            kontraktual mereka.

            Instrumen keuangan Grup yang mempunyai                                 The Group's financial instruments that have
            potensi atas risiko kredit terdiri dari kas dan setara                 the potential for credit risk consist of cash
            kas, piutang usaha, piutang retensi, tagihan bruto                     and cash equivalents, accounts receivable,
            dan piutang lain-lain. Jumlah eksposur risiko                          retention, gross amount due from customers
            kredit maksimum sama dengan nilai tercatat atas                        and other receivables. Total maximum credit
            akun-akun tersebut. Rincian umur piutang usaha                         risk exposure equal to the carrying value of
            dapat dilihat pada Catatan dalam laporan                               these accounts. The aging of trade
            keuangan konsolidasian. Pada tanggal 30 Juni                           receivables can be seen on notes to
            2023 dan 31 Desember 2022 piutang usaha Grup                           consolidated financial statements. On June
            tidak terkonsentrasi pada pelanggan tertentu.                          30, 2023 and December 31, 2022 accounts
                                                                                   receivable of the Group is not concentrated
                                                                                   on a particular customer.

            Grup mengelola risiko kredit dengan menetapkan                         The Group manages credit risk by setting
            batasan jumlah risiko yang dapat diterima untuk                        limits of acceptable risk for each customer
            masing-masing pelanggan dan lebih selektif dalam                       and be more selective in the choice of banks
            pemilihan bank dan institusi keuangan, yaitu hanya                     and financial institutions, that is, only banks
            bank-bank dan institusi keuangan ternama dan                           and financial institutions are predicated
            yang berpredikat baik yang dipilih.                                    famous and well chosen.

      (ii) Risiko Suku Bunga                                                  (ii) Interest Rate Risk

            Risiko tingkat bunga arus kas adalah risiko dimana                     Cash flow interest rate risk is the risk that
            arus kas masa depan dari suatu instrumen                               future cash flows of a financial instrument
            keuangan berfluktuasi karena perubahan suku                            fluctuate due to changes in market interest
            bunga pasar. Grup memiliki pinjaman jangka                             rates. The Group has short-term loans with
            pendek dengan bunga mengambang. Tingkat                                floating interest. The interest rate that are
            suku bunga yang cukup tinggi dan terjadi secara                        quite high and occurs suddenly can effect the
            tiba-tiba dapat berpengaruh terhadap menurunnya                        decline in the Group’s income.
            laba Grup.




                                                              217
Page 221
                                                                                The original consolidated financial statements included herein are in
                                                                                                                           the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                        PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                                  AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                    NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                              FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                     AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                            MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                                (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                       (Expressed in full Rupiah amount, unless otherwise stated)

          Berikut ini merupakan rincian dari liabilitas                                     The following is a breakdown of financial
          keuangan berdasarkan jenis tingkat suku bunga:                                    liabilities based on the type of interest rate:

                                                             30 Juni/            31 Desember/
                                                          June 30, 2023        December 31, 2022
                                                               Rp                     Rp
          Liabilitas Keuangan                                                                                                         Financial Liabilities
            Suku bunga mengambang                           801.127.052.202       4.210.231.347.315                                Floating Interest Rate


          Analisis sensitivitas suku bunga                                                  Interest rate sensitivity analysis

          Analisis sensitivitas di bawah ini telah ditentukan                               The sensitivity analysis below have been
          berdasarkan eksposur suku bunga untuk kedua                                       determined based on the exposure to
          instrumen derivatif dan non- derivatif pada akhir                                 interest rates for both derivatives and non-
          periode pelaporan. Untuk liabilitas tingkat bunga                                 derivative instruments at the end of
          mengambang, analisis tersebut disusun dengan                                      the reporting period. For floating rate
          asumsi jumlah liabilitas terutang pada akhir                                      liabilities, the analysis is prepared assuming
          periode pelaporan itu terutang sepanjang tahun.                                   the amount of the payable liability at the end
          Kenaikan atau penurunan 0,5 basis poin                                            of the reporting period will remain for
          digunakan ketika melaporkan risiko suku bunga                                     the whole year. A 0.5 basis points increase
          secara internal kepada karyawan kunci dan                                         or decrease is used when reporting interest
          merupakan penilaian manajemen terhadap                                            rate risk internally to key management
          perubahan yang mungkin terjadi pada suku                                          personnel and represents management's
          bunga.                                                                            assessment of the reasonably possible
                                                                                            change in interest rates.

          Jika suku bunga lebih tinggi/rendah 50 basis poin                                 If interest rates had been 50 basis points
          dan semua variabel lainnya tetap konstan, laba                                    higher/lower and all other variables
          pada tanggal 30 Juni 2023 dan 31 Desember 2022                                    were held constant, profit as of
          akan     turun/naik   masing-masing      sebesar                                  June 30, 2023 and December 31, 2022
          Rp328.536.852.420 dan Rp323.157.860.489. Hal                                      would           decrease/increase        by
          ini terutama disebabkan oleh eksposur Grup                                        Rp328,536,852,420,                      and
          terhadap suku bunga atas pinjamannya dengan                                       Rp323,157,860,489, respectively. This is
          suku bunga mengambang.                                                            mainly attributable to the Group’s exposure
                                                                                            to interest rates on its floating rate
                                                                                            borrowings.

      (iii) Risiko Likuiditas                                                         (iii) Liquidity Risk

          Risiko likuiditas adalah risiko di mana posisi arus                               Liquidity risk is the risk in which the positions
          kas menunjukkan pendapatan jangka pendek                                          of cash flows show short-term revenues are
          tidak cukup untuk menutupi pengeluaran jangka                                     not sufficient to cover short- term expenses.
          pendek.

          Eksposur risiko likuiditas berupa kesulitan Grup                                  Liquidity risk is an exposure of the Group
          dalam memenuhi kewajiban keuangan yang                                            difficulties in meeting financial obligations
          harus dibayar dengan kas atau aset keuangan                                       that must be paid with cash or other financial
          lainnya. Grup diharapkan dapat membayar                                           assets. The Group is expected to pay all its
          seluruh kewajibannya sesuai dengan jatuh tempo                                    obligations in accordance with contractual
          kontraktual. Dalam memenuhi liabilitas tersebut,                                  maturities. In fulfilling this obligation,
          maka Grup harus menghasilkan arus kas masuk                                       the Group must generate sufficient cash
          yang cukup.                                                                       inflows.

          Berikut ini merupakan liabilitas keuangan non-                                    These are non-derivative financial liabilities
          derivatif berdasarkan nilai sisa jatuh tempo yang                                 based on residual maturity value which was
          tidak didiskonto:                                                                 not discounted:




                                                                218
Page 222
                                                                                                                                                   The original consolidated financial statements included herein are in
                                                                                                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                                                                                      PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                                                                                                AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                                                                  NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                                                                                            FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                                                                                   AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                                                                                          MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                                                                                              (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                                                                                          (Expressed in full Rupiah amount, unless otherwise stated)

                                                                                                                              30 Juni/ June 30, 2023
                                                Tingkat bunga rata-rata
                                                   tertimbang efektif/            < 1 Tahun/          >1-2 Tahun/            >2-3 Tahun/               >3 Tahun/            Jumlah/            Biaya Emisi/         Nilai Tercatat/
                                                   Weighted average                < 1 Year           >1-2 Years             >2-3 Years                >3 Years              Total           Issuance Costs        Carrying Amount
                                                 effective interest rate              Rp                   Rp                    Rp                       Rp                  Rp                   Rp                     Rp

          Tanpa Bunga                                                                                                                                                                                                                                        Non-interest bearing
             Utang Usaha                                                   --    4.861.329.068.251     2.656.735.674.729    (339.000.986.236)                      --    7.179.063.756.744                    --    7.179.063.756.744                        Accounts Payable
             Utang Bruto Subkontraktor                                     --      950.702.469.036       704.600.517.050                   --                      --    1.655.302.986.086                    --    1.655.302.986.086    Gross Amount Due to Subcontractors
             Biaya yang Masih Harus Dibayar                                --    1.645.385.484.033                     --                  --                      --    1.645.385.484.033                    --    1.645.385.484.033                       Accrued Expenses
             Liabilitas Sewa Guna Usaha                                    --        5.574.946.312        24.370.225.076                   --                      --       29.945.171.388                    --       29.945.171.388                           Lease Liabilities
             Utang Ventura Bersama                                         --                    --      974.810.132.968                   --                      --      974.810.132.968                    --      974.810.132.968                   Joint Venture Payable
             Utang Lain-lain Jangka Panjang                                --                    --    1.615.730.914.845                   --                      --    1.615.730.914.845                    --    1.615.730.914.845              Other Long-Term Payables
          Instrumen tingkat bunga variabel                                                                                                                                                                                                       Variable interest rate instrument
             Utang Lembaga Keuangan Non Bank                         10,50                       --    5.355.373.249.169                    --                     --    5.355.373.249.169                    --    5.355.373.249.169   Loan to Financial Institution Non Bank
          Instrumen suku bunga tetap                                                                                                                                                                                                               Fixed interest rate instruments
             Utang Bank Jangka Pendek                                0 - 11        801.127.052.202                     --                   --                     --   801.127.052.202                      --       801.127.052.202                  Short-Term Bank Loans
             Utang Bank Jangka Panjang                         5,40 - 5,50          31.571.930.031    28.095.220.828.114                    --    18.048.098.495.094 46.174.891.253.239                      --    46.174.891.253.239                  Long-Term Bank Loans
             Surat Utang Jangka Menengah                                 10        250.000.000.000       475.000.000.000                    --                     --   725.000.000.000                      --       725.000.000.000                     Medium Term Notes
             Utang Obligasi                                   6,10 - 11,10       6.566.269.921.111     (857.124.098.535)    1.077.250.000.000      3.900.300.000.000 10.686.695.822.576        (17.430.990.411)    10.669.264.832.165                            Bonds Payable
             Sukuk Mudharabah                                 6,10 - 11,10                       --                    --                   --     1.148.100.000.000 1.148.100.000.000          (3.137.082.477)     1.144.962.917.523                      Sukuk Mudharabah
             Liabilitas Jangka Pendek Lainnya                             --       757.376.661.067                     --                   --                     --   757.376.661.067                      --       757.376.661.067              Other Short-Term Liabilities
            Jumlah Liabilitas Keuangan                                          15.869.337.532.043    39.044.717.443.416     738.249.013.764      23.096.498.495.094    78.748.802.484.317     (20.568.072.888)    78.728.234.411.429               Total Financial Liabilities


                                                                                                                                       31 Desember/ December 31, 2022
                                                Tingkat bunga rata-rata
                                                   tertimbang efektif/            < 1 Tahun/          >1-2 Tahun/            >2-3 Tahun/               >3 Tahun/            Jumlah/            Biaya Emisi/         Nilai Tercatat/
                                                   Weighted average                < 1 Year           >1-2 Years             >2-3 Years                >3 Years              Total           Issuance Costs        Carrying Amount
                                                 effective interest rate              Rp                   Rp                    Rp                       Rp                  Rp                   Rp                     Rp
          Tanpa Bunga                                                                                                                                                                                                                                        Non-interest bearing
             Utang Usaha                                                   --    5.758.363.676.394     1.844.269.439.249                    --                     --    7.602.633.115.643                    --    7.602.633.115.643                        Accounts Payable
             Utang Bruto Subkontraktor                                     --    1.441.438.956.960       621.583.465.598                    --                     --    2.063.022.422.558                    --    2.063.022.422.558    Gross Amount Due to Subcontractors
             Biaya yang Masih Harus Dibayar                                --    2.919.371.738.728                     --                   --                     --    2.919.371.738.728                    --    2.919.371.738.728                       Accrued Expenses
             Liabilitas Sewa Guna Usaha                                    --        4.659.389.210        60.861.324.487                    --                     --       65.520.713.697                    --       65.520.713.697                           Lease Liabilities
             Utang Ventura Bersama                                         --                    --    1.043.542.990.231                    --                     --    1.043.542.990.231                    --    1.043.542.990.231                   Joint Venture Payable
             Utang Lain-lain Jangka Panjang                                --                    --    1.525.808.998.059                    --                     --    1.525.808.998.059                    --    1.525.808.998.059              Other Long-Term Payables
          Instrumen tingkat bunga variabel                                                                                                                                                                                                       Variable interest rate instrument
             Utang Lembaga Keuangan Non Bank                         10,50                       --    2.360.440.508.707                    --                     --    2.360.440.508.707                    --    2.360.440.508.707   Loan to Financial Institution Non Bank
          Instrumen suku bunga tetap                                                                                                                                                                                                               Fixed interest rate instruments
             Utang Bank Jangka Pendek                                0 - 11      4.210.231.347.315                     --                   --                     --    4.210.231.347.315                   --     4.210.231.347.315                  Short-Term Bank Loans
             Utang Bank Jangka Panjang                         5,40 - 5,50         315.275.858.301    26.599.520.941.348                    --    22.572.427.654.703    49.487.224.454.352                   --    49.487.224.454.352                  Long-Term Bank Loans
             Surat Utang Jangka Menengah                                 10                      --      250.000.000.000                    --                     --      250.000.000.000                   --       250.000.000.000                     Medium Term Notes
             Utang Obligasi                                   6,10 - 11,10       7.020.963.643.191     4.476.591.996.695                    --                     --   11.497.555.639.886     (33.136.680.825)    11.464.418.959.061                            Bonds Payable
             Liabilitas Jangka Pendek Lainnya                             --       653.230.951.539                     --                   --                     --      653.230.951.539                   --       653.230.951.539              Other Short-Term Liabilities
            Jumlah Liabilitas Keuangan                                          22.323.535.561.638    38.782.619.664.374                    --    22.572.427.654.703    83.678.582.880.715     (33.136.680.825)    83.645.446.199.890               Total Financial Liabilities


           Grup mengelola risiko likuiditas dengan                                                                                                                      The Group manages liquidity risk by
           mempertahankan kas dan setara kas yang                                                                                                                       maintaining cash and cash equivalents
           mencukupi dalam memenuhi komitmen Grup                                                                                                                       sufficient to meet the commitments of
           untuk operasi normal dan secara rutin                                                                                                                        the Group for normal operation and regularly
           mengevaluasi proyeksi arus kas dan arus kas                                                                                                                  evaluates cash flow projections and actual
           aktual, serta jadwal tanggal jatuh tempo aset dan                                                                                                            cash flows, and the schedule date of maturity
           liabilitas keuangan.                                                                                                                                         of assets and financial liabilities.

      (iv) Risiko Nilai Tukar Mata Uang Asing                                                                                                                (iv) Foreign Exchange Risk Foreign Currency

           Eksposur risiko nilai tukar mata uang asing                                                                                                                  Risk exposure of foreign currency exchange
           merupakan bagian dari kegiatan operasi normal                                                                                                                rate is part of normal operations of
           Perusahaan dan cabang Luar Negeri.                                                                                                                           the Company and the Foreign branches.

           Pengaruh dari selisih nilai tukar mata uang asing                                                                                                            The effect of foreign exchange currency
           tidak signifikan.                                                                                                                                            differences is not significant.

      (v) Risiko Perubahan Kebijakan Pemerintah,                                                                                                              (v) Risk of Changes in Government Policy,
          Kondisi Ekonomi dan Sosial Politik.                                                                                                                     Economic and Social Politics.

           Kebijakan Pemerintah baik yang menyangkut                                                                                                                    Government policies concerning economic
           ekonomi dan moneter, serta kondisi sosial dan                                                                                                                and monetary, and social and political
           politik yang kurang kondusif akan berakibat                                                                                                                  conditions that are less conducive will result
           menurunnya investasi dan pembangunan. Hal ini                                                                                                                in the decreasing of investment and

                                                                                                                        219
Page 223
                                                                                The original consolidated financial statements included herein are in
                                                                                                                           the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                          PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                                    AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                                FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                       AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                              MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                                  (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                       (Expressed in full Rupiah amount, unless otherwise stated)

             dapat mengakibatkan tertundanya proyek-proyek                                   development. This can lead to delays in
             yang telah maupun akan diperoleh Grup.                                          projects that have been or will be acquired by
                                                                                             the Group.

             Risiko ini merupakan risiko yang bersifat sistemik                              This risk is a systemic risk whereby if this
             dimana bila risiko ini terjadi maka akan                                        happens then the risk will negatively affect all
             mempengaruhi secara negatif seluruh variabel                                    the    variables     involved,   this    make
             yang terlibat, sehingga membuat kinerja Grup                                    the performance of the Group decrease.
             menurun. Diversifikasi risiko ini pun belum                                     Even risk diversification is not able to
             mampu menghilangkan risiko ini.                                                 eliminate this risk.

  c. Manajemen Risiko Modal                                                      c.    Capital Risk Management Policy

      Tujuan dari Grup dalam mengelola permodalan adalah                                The purpose of the Group in managing capital is
      untuk melindungi kemampuan Grup              dalam                                to protect the ability of the Group in maintaining
      mempertahankan kelangsungan usaha, sehingga                                       business continuity, so the Group can still deliver
      Grup dapat tetap memberikan hasil bagi pemegang                                   results for shareholders and benefits for other
      saham dan manfaat bagi pemangku kepentingan                                       stakeholders, and to provide adequate returns to
      lainnya, dan untuk memberikan imbal hasil yang                                    shareholders by pricing products and services
      memadai kepada pemegang saham dengan                                              that are commensurate with the level of risk.
      menentukan harga produk dan jasa yang sepadan
      dengan tingkat risiko.

      Grup menetapkan sejumlah modal sesuai proporsi                                    The Group set a number of capital in proportion
      terhadap risiko. Grup mengelola struktur modal dan                                to the risk. The Group manages its capital
      membuat penyesuaian dengan memperhatikan                                          structure and makes adjustments taking into
      perubahan kondisi ekonomi dan karakteristik risiko                                account changes in economic conditions and
      aset yang mendasari.                                                              risk characteristics of the underlying asset.

      Konsisten dengan Perusahaan lain dalam industri,                                  Consistent with other companies in the industry,
      Grup memonitor modal dengan dasar rasio utang                                     the Group monitors capital on the basis of
      terhadap modal yang disesuaikan. Rasio ini dihitung                               the debt ratio of to adjusted capital. This ratio is
      sebagai berikut: utang neto dibagi modal yang                                     calculated as follows: net debt divided by
      disesuaikan. Utang neto merupakan total liabiltas                                 adjusted capital. Net debt is total liabilities (as
      (sebagaimana jumlah dalam laporan posisi keuangan)                                the amount in the statement of financial position)
      dikurangi kas dan setara kas.                                                     minus cash and cash equivalents.

     Strategi Grup untuk mempertahankan rasio utang                                     The Group's strategy is to maintain ratio of
     terhadap modal yang disesuaikan pada batas bawah                                   the debt to adjusted capital at the lower limit with
     dari kisaran 2 Rasio utang terhadap modal yang                                     the range of 2 Debt to capital ratio as of June 30,
     disesuaikan pada tanggal 30 Juni 2023 dan                                          2023 and December 31, 2022 are as follows:
     31 Desember 2022 adalah sebagai berikut:

                                                        30 Juni/               31 Desember/
                                                     June 30, 2023           December 31, 2022
                                                          Rp                        Rp
    Liabilitas Keuangan                                                                                                                 Financial Liabilities
      Suku bunga mengambang                            801.127.052.202          4.210.231.347.315                                    Floating Interest Rate


    Total Liabilitas                                 84.310.891.068.631        83.987.631.948.080                                           Total Liabilities
    Dikurang: Kas dan Setara Kas                      1.724.079.213.820         2.221.541.281.141                        Deduct: Cash and Cash Equivalents
    Liabilitas Bersih                                82.586.811.854.811        81.766.090.666.939                                            Net Liabilities
    Total Ekuitas                                    12.009.840.579.111        15.461.433.243.830                                               Total Equity
    Rasio Utang terhadap Modal                                       6,88                   5,29                                     Net Debt to Equity Ratio


  d. Risiko Legal                                                                 d.    Legal Risk

     Risiko legal berupa tuntutan pidana maupun gugatan                                  Legal risks in the form of criminal charges or
     perdata dapat terjadi apabila terdapat (atau                                        civil suits can occur if there is (or is fulfilled) an
     terpenuhinya) unsur Perbuatan Melawan Hukum.                                        element of illegal acts. Actions against the law
     Perbuatan melawan hukum adalah tindakan yang                                        are actions taken by the Company in carrying
     dilakukan oleh Perusahaan dalam menjalankan                                         out operational activities and/or corporate


                                                               220
Page 224
                                                                      The original consolidated financial statements included herein are in
                                                                                                                 the Indonesian language.


 PT WASKITA KARYA (PERSERO) TBK                                                PT WASKITA KARYA (PERSERO) TBK
 DAN ENTITAS ANAK                                                                          AND ITS SUBSIDIARIES
 CATATAN ATAS LAPORAN KEUANGAN                                            NOTES TO THE INTERIM CONSOLIDATED
 KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                      FINANCIAL STATEMENTS AS OF JUNE 30, 2023
 31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                             AND DECEMBER 31, 2022 AND FOR THE SIX
 ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                    MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
 (2022 – DIAUDIT) – Lanjutan                                                        (2022 – AUDITED) – Continued
 (Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)            (Expressed in full Rupiah amount, unless otherwise stated)

        kegiatan operasi dan/atau aksi korporasi           yang              actions that         are    contrary      to    applicable
        bertentangan dengan regulasi yang berlaku.                           regulations.

        Upaya mitigasi yang telah dan akan tetap dilakukan oleh              Mitigation efforts that have been and will
        Perusahaan untuk menghindari terjadinya perbuatan                    continue to be carried out by the Company to
        melawan hukum adalah melakukan review atas setiap                    avoid illegal acts are to review every operational
        kegiatan operasi dan/atau aksi korporasi berdasarkan                 activity and/ or corporate action based on
        regulasi yang berlaku sebelum memutuskan                             applicable regulations before deciding to carry
        menjalankan transaksi. Untuk memastikan kerangka                     out a transaction. To ensure a controlled legal
        risiko legal yang terkendali dan tetap menjaga                       risk framework and maintain business
        keberlangsungan usaha, Perusahaan melakukan:                         continuity, the Company carries out:

         •   Analisis risiko atas suatu transaksi yang akan                 •    Risk analysis of a transaction to be carried
             dilakukan, dan                                                      out, and
         •   Review atas perjanjian yang akan ditanda-                      •    Review of the agreement to be signed.
             tangani.

        Kegiatan review tersebut dapat dilakukan secara in-                  The review activity can be carried out in-house
        house atau dengan melibatkan Konsultan Hukum                         or by involving a Company Legal Consultant.
        Perusahaan.

57.   KOMITMEN DAN KONTINJENSI                                     57. COMMITMENT AND CONTINGENCY

      Perusahaan                                                       The Company

      Berdasarkan akta notaris Euis Budiarti Afandi, Sarjana           Based on notarial deed of Euis Budiarti Afandi,
      Hukum,     Spesialis   Notaris   No.    02/WASKITA-              Bachelor       of     Law,      Notary  Specialist
      ACSET/KSO/2017, tanggal 19 Januari 2017 telah                    No. 02/WASKITA-ACSET/KSO/2017, dated January
      dibentuk Kerjasama Operasi (KSO) antara Perusahaan               19, 2017 has been established Joint Operation (JO)
      dengan PT Acset Indonusa Tbk dengan nama Waskita                 between the Company with PT Acset Indonusa Tbk
      – Acset KSO untuk pelaksanaan pekerjaan                          under the name of JO Waskita - Acset for the
      pembangunan Jalan Tol Jakarta Cikampek II Elevated               engagement of Jakarta Cikampek II Toll Road
      ruas      Cikunir      s.d      Karawang         Barat           Elevated      Cikunir      to    West   Karawang
      (sta 9+500 s.d sta 47+500).                                      (sta 9 + 500 s.d sta 47 + 500).

      Perusahaan mempunyai porsi yang dikerjakan secara                The Company has a portion of joint operation for
      porsi untuk pelaksanaan pekerjaan pembangunan Jalan              the engagement of the construction work of Jakarta
      Tol Jakarta Cikampek II Elevated ruas Cikunir s.d                Cikampek II Toll Road Elevated Cikunir to West
      Karawang Barat sta 9+500 - sta 28+480 berdasarkan                Karawang sta 9 + 500 - sta 28 + 480 based on
      perjanjian      kerja    sama      operasi    (KSO)              cooperation agreement (KSO) No: 01/WASKITA-
      No: 01/WASKITA-ACSET/JOA/2017. Sisa pekerjaan                    ACSET/JOA/2017. The rest of the construction work
      pembangunan Jalan Tol Jakarta Cikampek II Elevated               of the Jakarta Cikampek II Toll Road Elevated Cikunir
      ruas Cikunir s.d Karawang Barat (sta 9+500 s.d sta               to West Karawang segment (sta 9 + 500 s.d sta 47 +
      47+500) dilaksanakan secara ventura bersama (Catatan             500) is worked by joint venture (Note 13).
      13).

      Entitas Anak dari PT Waskita Karya Infrastruktur                 Subsidiary of PT Waskita Karya Infrastruktur
      (WKI), PT Waskita Sangir Energy (WSE)                            (WKI), PT Waskita Sangir Energy (WSE)

      WSE menandatangani Power Purchase Agreement                      WSE entered into Power Purchase Agreement
      (PPA) pada tanggal 23 Maret 2015 dengan PLN.                     (PPA) on March 23, 2015 with PLN. Under
      Berdasarkan ketentuan PPA, PLN telah berkomitmen                 the terms of the PPA, PLN has committed to
      untuk membeli kapasitas pembangkit listrik WSE dan               purchase the available capacity of the WSE’s power
      seluruh hasil listrik selama dua puluh tahun sampai 2036.        stations and all generated of electricity for a period
                                                                       of twenty years until 2036.

      WSE telah membangun, memiliki dan mengoperasikan                 WSE has build, owned and operated the plant
      fasilitas pabrik yang berlokasi di Solok Selatan, Sumatera       facilities at site which is located at South Solok, West
      Barat.                                                           Sumatera.



                                                             221
Page 225
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

   Setelah beroperasi secara komersial dalam proyek, WSE            Upon commercial operation of the Project, WSE is
   berkewajiban menyediakan kepada PLN keluaran listrik             obligated to make available to PLN the net electrical
   bersih dari fasilitas proyek, yang akan dibeli oleh PLN          output of the project's plant facilities, which will be
   pada jumlah yang ditentukan berdasarkan formula yang             purchased by PLN at amounts determined under
   tercantum dalam PJBL. Jumlah yang harus dibayar oleh             formula set forth in the PJBL. The amount to be paid
   PLN adalah jumlah keluaran listrik bersih yang dihasilkan.       by PLN is the amount of net electrical output
   Jangka     waktu      PPA      dimulai   pada     tanggal        produced. The term of the PPA commenced on
   9 Desember 2016 dan akan berakhir pada tanggal                   December 9, 2016 and will expire on December 9,
   9 Desember 2036, kecuali diakhiri lebih awal sesuai              2036, unless terminated earlier in accordance with
   dengan ketentuan PPA, sebagaimana telah diubah.                  the terms of the PPA, as amended.

   Seluruh pihak sepakat harga energi listrik terukur pada          All parties agreed electricity price estimated on
   titik transaksi, yaitu:                                          transaction points as stated:

   i.   Rp1.182,50 per kWh untuk tahun ke-1 sampai dengan           i.   Rp1,182.50 per kWh for year-1 through year-8
        tahun ke-8 sejak tanggal operasi komersial                       since the date of plant’s commercial operation;
        pembangkit; dan                                                  and

   ii. Rp825 per kWh untuk tahun ke-9 sampai dengan                 ii. Rp825 per kWh for year-9 through year-20 since
       tahun ke-20 sejak tanggal operasi komersial                      the date of plant’s commercial operation.
       pembangkit.
   PLN memiliki opsi untuk membeli hak, kepemilikan, dan            PLN has an option to purchase the WSE's right, title
   kepentingan WSE dalam proyek dengan nilai terminasi              and interest in the project for a termination value
   berdasarkan formula tertentu yang tercantum dalam PPA.           based on a certain formula set forth in
   Harga beli yang harus dibayar oleh PLN, dalam hal PLN            the PPA. The purchase price to be paid by PLN, in
   melakukan opsi pembelian, mengalami penurunan seiring            case PLN exercises the purchase option, decreases
   menjelang berakhirnya PPA.                                       as the end of the PPA approaches.

   Pada tanggal 1 Juni 2016, WSE dan PLN                            On June 1, 2016, WSE and PLN entered into
   menandatangani amendemen PPA terkait kewajiban dan               the amendment to the PPA regarding obligation and
   tanggung jawab para pihak, pembangunan pembangkit                responsibilities of both parties, construction of power
   dan pembayaran yang diizinkan berdasarkan PPA awal,              plants and payment, which is allowed under
   jika disetujui kedua belah pihak. Di bawah PPA, kedua            the original PPA, if agreed by both parties. Under
   belah pihak sepakat untuk mengubah hal-hal tertentu dari         the PPA, both parties agreed to amend certain
   PPA awal.                                                        matters of the original PPA.

   Entitas Anak, PT Waskita Karya Realty (WKR)                      Subsidiary, PT Waskita Karya Realty (WKR)

   Dalam rangka melakukan kegiatan usaha, WKR                       In connection with its operations, WKR entered into
   memiliki perjanjian-perjanjian penting. Perjanjian dan           significant agreements. The significant agreements
   ikatan penting yang masih berlaku sampai dengan                  and commitments applied until December 31, 2022
   tanggal 31 Desember 2022 adalah sebagai berikut:                 are as follows:

   Perjanjian dengan PT Dafam Hotel Management                      Agreement with PT Dafam Hotel Management

   Pada tanggal 24 Maret 2016, WKR menandatangani                   Based on the Deed No. 2 dated March 24, 2016,
   perjanjian No. 2 dengan PT Dafam Hotel Management                WKR entered into management agreement with
   (Operator). Berdasarkan perjanjian tersebut, PT Dafam            PT Dafam Hotel Management (the Operator). Based
   Hotel Management bertanggungjawab sebagai operator               on the agreement, PT Dafam Hotel Management is
   atas Hotel Dafam Teraskita milik WKR.                            responsible as the operator of Hotel Dafam
                                                                    Teraskita owned by WKR.

   Jangka waktu perjanjian adalah 10 (sepuluh) tahun                The period of the agreement is 10 (ten) years since
   sejak ditandatanganinya perjanjian dan dapat                     the signing date of this agreement and could be
   diperpanjang jika disetujui oleh kedua belah pihak paling        renewed if agreed upon by both parties at least 90
   lambat 90 hari kerja sebelum tanggal berakhirnya.                working days before the expiration date.

   Berdasarkan perjanjian tersebut, para pihak menyetujui           Based on those agreements, all parties agreed that
   bahwa PT Dafam Hotel Management sebagai Operator                 PT Dafam Hotel Management as Operator entitled
   berhak menerima:                                                 to receive:



                                                          222
Page 226
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

   1.   Technical Assistant Fee sebesar Rp600.000.000               1. Technical Assistant Fee amounting to
        yang dibayarkan pada tanggal 26 Mei 2015.                      Rp600,000,000 which has been paid on May 26,
                                                                       2015.

   2.   Base fee sebesar 2% pada tahun pertama dan 2,5%             2. Base fee of 2% for the first year and 2,5% for
        di tahun-tahun berikutnya dari Total Pendapatan                following years from of Total Operating
        Operasional.                                                   Revenue.

   3.   Incentive Fee berdasarkan tinggi rendahnya Gross            3. Incentive Fee based on high and low of Gross
        Operating Profit (GOP) :                                       Operating Profit (“GOP”) :

        a.   0% dari GOP apabila GOP kurang dari 35% dari               a. 0% of GOP if GOP is less than 35% of Total
             Pendapatan Hotel Total;                                       Revenue Hotel;
        b.   5% dari GOP apabila GOP lebih dari 35% dan                 b. 5% of GOP if GOP is more than 35% and less
             kurang dari atau sama dengan 45% dari                         than or equivalent with 45% of Total Revenue
             Pendapatan Hotel Total; dan                                   Hotel; and
        c.   7% dari GOP apabila GOP lebih dari 45% dari                c. 7% of GOP if GOP is more than 45% of Total
             Pendapatan Hotel Total.                                       Revenue Hotel.

   4.   Sales and marketing fee adalah 1% dari pendapatan           4. Sales and marketing fee are 1% of the gross
        kotor kamar per bulan.                                         revenue room per month.

   Perjanjian KSO dengan PT Sirius Terang Cemerlang                 Joint Venture Agreement with PT Sirius Terang
                                                                    Cemerlang

   Pada tanggal 26 Mei 2015, WKR menandatangani kontrak             On May 26, 2015, WKR entered into joint venture
   perjanjian KSO No. 166 dengan PT Perintis Triniti Properti       agreement No. 166 with PT Perintis Triniti Properti
   dan PT Perintis Trusmi Properti dalam rangka                     and PT Perintis Trusmi Properti in order to develop
   pengembangan tanah seluas 5.000 m2 yang terletak di              5,000       sqm      land       areas      at     Jalan
   Jalan Sutera Boulevard, Alam Sutera, Tangerang.                  Sutera Boulevard, Alam Sutera, Tangerang.
   Perjanjian ini berakhir apabila pelaksanaan pekerjaan            The agreement ends when the execution of
   proyek KSO telah selesai dengan dibuktikannya telah              the joint venture’s project work has been completed
   habisnya masa pemeliharaan pekerjaan kontraktor dan              demonstrated        with      the      expiration     of
   KSO, serta seluruh hak dan kewajiban antara KSO                  the maintenance work of the contractor and joint
   dengan pembeli, pihak ketiga, Instansi Pemerintah yang           venture, as well as all rights and obligations between
   terkait dan berwenang dalam rangka pelaksanaan dan               the joint venture and a buyer, a third party,
   penyelesaian KSO telah terpenuhi semuanya tanpa                  government agencies involved and is competent in
   menimbulkan tunggakan kewajiban.                                 the implementation and completion of the joint
                                                                    venture has been fulfilled without causing arrears of
                                                                    obligations.

   Komposisi penyertaan saham terdiri dari WKR sebesar              The composition of shareholders consists of
   40,8%, PT Perintis Triniti Properti sebesar 39,2%, dan           WKR at 40.8%, PT Perintis Properti Triniti at 39.2%,
   PT Perintis Trusmi Properti sebesar 20% dengan modal             and PT Perintis Trusmi Properti at 20% with an initial
   awal sebesar Rp125.000.000.000.                                  capital of Rp125,000,000,000.

   Pada tanggal 30 Oktober 2015, terdapat pembaruan                 On October 30, 2015, there is a renewal of
   perjanjian KSO Waskita Triniti II. Disepakati bahwa              the KSO Waskita Triniti II agreement. It was agreed
   posisi PT Perintis Triniti Properti digantikan oleh              that the position PT Perintis Triniti Properti is
   PT Sirius Terang Cemerlang. Seluruh hak dan kewajiban            replaced by PT Sirius Terang Cemerlang. All rights
   PT Perintis Triniti Properti dialihkan kepada PT Sirius          and obligations of PT Perintis Triniti Properti is
   Terang Cemerlang.                                                transferred to PT Sirius Terang Cemerlang.

   Berdasarkan Akta No. 9 tanggal 3 Oktober 2016,                   Based on the Deed No. 9 dated October 3, 2016,
   terdapat perubahan perjanjian KSO Waskita Triniti II             there is a change of the KSO Waskita Triniti II
   yang berisi komposisi penyertaan saham yang baru,                agreement which contains the composition of
   yaitu   WKR      sebesar     50,8%    atau   senilai             investments in new shares, namely WKR of 50.8%
   Rp69.646.800.000 dan PT Sirius Terang Cemerlang                  or    equivalent   to   Rp69,646,800,000     and
   sebesar 49,2% atau senilai Rp67.453.200.000.                     PT Sirius Terang Cemerlang by 49.2% or equivalent
                                                                    to Rp67,453,200,000.



                                                          223
Page 227
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

   Perjanjian KSO dengan PT Darmo Permai                            Joint Venture Agreement with PT Darmo Permai

   Pada tanggal 21 Mei 2014, WKR menandatangani                     On May 21, 2014, WKR entered into KSO
   kontrak perjanjian KSO No. 6 dengan PT Darmo Permai              agreement No. 6 with PT Darmo Permai in order to
   dalam rangka pengembangan tanah seluas 34.089 m2                 develop 34,089 sqm land areas at Segi 8 Darmo
   yang terletak di Segi 8 Darmo Jalan Raya Darmo Permai            Jalan Raya Darmo Permai III, Surabaya Barat.
   III, Surabaya Barat.

   Perjanjian ini berakhir apabila pelaksanaan pekerjaan            The agreement ends when the execution of the joint
   proyek KSO telah selesai dengan dibuktikannya telah              venture’s project work has been completed
   habisnya masa pemeliharaan pekerjaan kontraktor dan              demonstrated       with       the      expiration   of
   KSO, serta seluruh hak dan kewajiban antara KSO                  the maintenance work of the contractor and joint
   dengan pembeli, pihak ketiga, Instansi Pemerintah yang           venture, as well as all rights and obligations between
   terkait dan berwenang dalam rangka pelaksanaan dan               the joint venture and a buyer, a third party,
   penyelesaian KSO telah terpenuhi semuanya tanpa                  government agencies involved and is competent in
   menimbulkan tunggakan kewajiban.                                 the implementation and completion of the joint
                                                                    venture has been fulfilled without causing arrears of
                                                                    obligations.

   Komposisi penyertaan saham terdiri dari WKR sebesar              The composition of shareholders consists of
   51%, PT Darmo Permai sebesar 49% dengan modal                    WKR at 51%, PT Darmo Permai at 49% with an
   awal sebesar Rp426.112.500.000.                                  initial capital of Rp426,112,500,000.

   Perjanjian KSO dengan PT Graha Jasa Ekatama                      Joint Venture Agreement with PT Graha Jasa
                                                                    Ekatama

   Pada tanggal 6 Juni 2016, WKR menandatangani                     On June 6, 2016, WKR entered into KSO agreement
   kontrak perjanjian KSO No. 17 dengan PT Graha Jasa               No. 17 with PT Graha Jasa Ekatama in order to
   Ekatama dalam rangka pengembangan tanah seluas                   develop 11,090 sqm at West Pejaten, South Jakarta.
   11.090 m2 di Pejaten Barat, Jakarta Selatan. Perjanjian          The agreement ends when the execution of the joint
   ini berakhir apabila pelaksanaan pekerjaan proyek KSO            venture’s project work has been completed
   telah selesai dengan dibuktikannya telah habisnya masa           demonstrated with the expiration of the maintenance
   pemeliharaan pekerjaan kontraktor dan KSO, serta                 work of the contractor and joint venture, as well as
   seluruh hak dan kewajiban antara KSO dengan pembeli,             all rights and obligations between the joint venture
   pihak ketiga, Instansi Pemerintah yang terkait dan               and a buyer, a third party, government agencies
   berwenang       dalam     rangka   pelaksanaan     dan           involved and is competent in the implementation and
   penyelesaian KSO telah terpenuhi semuanya tanpa                  completion of the joint venture has been fulfilled
   menimbulkan       tunggakan     kewajiban.   Komposisi           without     causing     arrears    of    obligations.
   penyertaan saham di dalam KSO Waskita Ekatama                    The composition of the shareholder in the Waskita
   terdiri dari WKR sebesar 60%, PT Graha Jasa Ekatama              Ekatama joint venture consists of WKR at 60%,
   sebesar      40%    dengan modal        awal sebesar             PT Graha Jasa Ekatama at 40% with initial capital of
   Rp331.000.000.000.                                               Rp331,000,000,000.

   Perjanjian KSO dengan PT Rajawali Nusantara                      Joint Venture Agreement with PT Rajawali
   Indonesia                                                        Nusantara Indonesia

   Pada tanggal 10 Oktober 2016, WKR menandatangani                 On October 10, 2016, WKR entered into KSO
   kontrak perjanjian KSO No. 2079 dengan PT Rajawali               agreement No. 2079 with PT Rajawali Nusantara
   Nusantara Indonesia dalam rangka pengembangan                    Indonesia in order to develop 7,025 sqm of land at
   tanah seluas 7.025 m2 di Jalan MT. Haryono Kav 12-13,            Jalan MT. Haryono Kav 12-13, East Jakarta.
   Jakarta Timur. Jangka waktu operasi berlaku selama 48            The operating periods is valid for 48 months and
   bulan dan perjanjian ini berakhir apabila pelaksanaan            the agreement ends when the execution of
   pekerjaan proyek KSO telah selesai dengan                        the joint venture’s project work has been completed,
   dibuktikannya telah habisnya masa pemeliharaan                   demonstrated with the expiration of the maintenance
   pekerjaan kontraktor dan KSO, serta seluruh hak dan              work of the contractor and joint venture, as well as
   kewajiban antara KSO dengan pembeli, pihak ketiga,               all rights and obligations between the joint venture
   Instansi Pemerintah yang terkait dan berwenang dalam             and a buyer, a third party, government agencies
   rangka pelaksanaan dan penyelesaian KSO telah                    involved and is competent in the implementation and
   terpenuhi semuanya tanpa menimbulkan tunggakan                   completion of the joint venture has been fulfilled
   kewajiban.                                                       without causing arrears of obligations.


                                                          224
Page 228
                                                                       The original consolidated financial statements included herein are in
                                                                                                                  the Indonesian language.


 PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
 DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
 CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
 KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
 31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
 ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
 (2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
 (Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

      Komposisi penyertaan modal di dalam KSO RNI –                    The composition of the capital investment in the KSO
      Waskita terdiri dari RNI berupa tanah seluas 7.052 m 2,          RNXI - Waskita consists of RNI with land areas of
      dan    WKR        berupa     modal    kerja    sebesar           7,052sqm and WKR with initial capital of
      Rp361.912.928.457.                                               Rp361,912,928,457.

      Pada akhir periode perjanjian KSO, RNI akan menerima             At the end of joint venture agreement, RNI will
      bagi hasil senilai Rp367.544.705.882.                            receive   profit    sharing    amounting    to
                                                                       Rp367,544,705,882.

      Perjanjian Dengan PT Kereta Api Indonesia (Persero)              Agreement          with PT         Kereta      Api     Indonesia
                                                                       (Persero)

      Pada tanggal 30 November 2017, Perusahaan                        On November 30, 2017, the Company entered into
      menandatangani perjanjian Kerja Sama Usaha (KSU)                 agreement with PT Kereta Api Indonesia (Persero)
      dengan PT Kereta Api Indonesia (Persero)                         No.    007/P.WKR/2017       related  to    Transit
      No. 007/P.WKR/2017         terkait   dengan    Transit           Development Orientation Project in Bogor. Both
      Development Orientation Project di Bogor. Kedua belah            parties agreed to develop the utilization of land
      pihak secara bersama-sama sepakat untuk melakukan                owned by PT Kereta Api Indonesia (Persero) in
      kerjasama terkait dengan pemanfaatan lahan milik                 Bogor station area. This agreement will be due on
      PT Kereta Api Indonesia (Persero) di kawasan stasiun             November 2070.
      Bogor. Perjanjian ini berakhir pada November 2070.

      Perjanjian KSO RNI – WSKT                                         Agreement KSO RNI - WSKT

      Pada tanggal 20 November 2017, KSO RNI – Waskita                  On November 20, 2017, KSO RNI - Waskita entered
      membuat perjanjian Pengikatan Jual Beli (PPJB) dengan             into agreement with WSKT No. 04 on sale of office
      WSKT No. 04 tentang penjualan ruang perkantoran pada              space owned by KSO RNI Waskita project
      proyek KSO RNI Waskita dengan nilai jual                          amounting to Rp563,310,000,000 before VAT
      Rp563.310.000.000 sebelum PPN dan terakhir dilakukan              and         has       been        revised      with
      amendemen dengan No: 01/AMD/PPJB/KSO/RNI-                         No. 01/AMD/PPJB/KSO/RNI-WASKITA/2018 dated
      WASKITA/2018 tanggal 13 Juli 2018. Pembayaran atas                July 13, 2018. The payment made by installment
      penjualan ini dilakukan secara bertahap sampai dengan             basis untill the completion of development and Buy
      penyelesaian pembangunan dan Akta Jual Beli                       and Sell Deed signed between both of sides.
      ditandatangani kedua belah pihak.

58.   REKLASIFIKASI AKUN                                         58.     RECLASSIFICATION OF ACCOUNTS

      Reklasifikasi tertentu telah dilakukan terhadap laporan           Certain reclassifications have been made to
      keuangan konsolidasian periode sebelumnya untuk                   the prior year’s consolidated financial statements to
      meningkatkan       keterbandingan     dengan    laporan           enhance comparability with the current period’s
      keuangan konsolidasian periode berjalan.                          consolidated financial statements.

      Akibatnya, pos-pos tertentu telah diubah di laporan laba          As a result, certain items have been amended in the
      rugi dan penghasilan komprehensif lain dan catatan atas           consolidated statement of profit or loss and other
      laporan keuangan konsolidasian terkait. Angka                     comprehensive income and the related notes to the
      komparatif telah disesuaikan dengan penyajian periode             consolidated financial statements. Comparative
      berjalan.                                                         figures have been adjusted to conform in the
                                                                        Current Period.

      Grup melakukan reklasifikasi laporan keuangan Interim             The Group reclass the Interim financial statements
      untuk periode enam bulan yang berakhir pada tanggal               for the six month periods ended June 30, 2022,
      30 Juni 2022, berdasarkan surat dari OJK Nomor                    based on a letter from OJK Number
      S-480/PM.21/2023 tanggal 17 Maret 2023 perihal                    S-480/PM.21/2023 dated March 17, 2023 regarding
      Perintah Tindakan Tertentu kepada PT Waskita Beton                Certain Action Orders to PT Waskita Beton Precast
      Precast Tbk, merujuk pada POJK 23/2021, WSBP                      Tbk, referring to POJK 23/2021, WSBP were asked
      diminta untuk melakukan perbaikan atas kesalahan                  to make corrections to the mispresentation of the
      penyajian pos OWK karena pos OWK belum dapat                      MCB post because the MCB post could not meet the
      memenuhi kriteria pengakuan awal instrumen keuangan               criteria for early recognition of financial instruments
      berdasarkan PSAK 50. Reklasifikasi dilakukan pada                 based on PSAK 50. Reclassification was carried out
      laporan keuangan 30 Juni 2022 dan periode                         in the June 30 2022 financial statements and the


                                                           225
Page 229
                                                                                                  The original consolidated financial statements included herein are in
                                                                                                                                             the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                                         PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                                                   AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                     NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                                               FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                                      AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                                             MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                                                 (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                                        (Expressed in full Rupiah amount, unless otherwise stated)

    pembanding    LKTT   2023                   dengan             melakukan                           2023 LKTT comparison period                           by       making
    penyesuaian pos OWK.                                                                               adjustments to the MCB post.

                                                                     31 Desember/ December 31, 2022
                                                 Sebelum Reklasifikasi/      Reklasifikasi/       Setelah Reklasifikasi/
                                                  Before Reclassified       Reclassification        As Reclassified
                                                          Rp                       Rp                      Rp

    ASET                                                                                                                                                               ASSETS
    ASET LANCAR                                                                                                                                             CURRENT ASSETS
    Kas dan Setara Kas                                8.945.714.916.516         (6.724.173.635.375)          2.221.541.281.141                        Cash and Cash Equivalents
    Kas yang Dibatasi Penggunaannya                                   --          6.852.531.796.345          6.852.531.796.345                                  Restricted Cash
    Investasi Jangka-Pendek                             136.806.360.970           (128.358.160.970)              8.448.200.000                           Short-Term Investments

                                                                              30 Juni/ June 30, 2022
                                                 Sebelum Reklasifikasi/           Reklasifikasi/            Setelah Reklasifikasi/
                                                  Before Reclassified            Reclassification             As Reclassified
                                                          Rp                            Rp                           Rp
    Beban Penjualan                                       (18.462.645.115)           (39.330.686.402)               (57.793.331.517)                            Selling Expenses
    Beban Umum dan Administrasi                       (1.274.674.969.002)             386.855.625.967             (887.819.343.035)           General and Administrative Expenses
    Pendapatan (Beban) Lain - lain - Bersih             2.835.044.768.149           (347.524.939.565)             2.487.519.828.584                  Other Income (Expense) - Net

                                                                              30 Juni/ June 30, 2022
                                                 Sebelum Reklasifikasi/           Reklasifikasi/            Setelah Reklasifikasi/
                                                  Before Reclassified            Reclassification             As Reclassified
                                                          Rp                            Rp                           Rp
    Penerimaan Investasi Jangka Pendek                   21.448.626.049               (21.448.626.049)                           --            Receipt from Short-Term Investments
    Penurunan Kas yang dibatasi penggunaanya                          --                21.448.626.049              21.448.626.049                      Decrease in Restricted Cash

                                                                             30 Juni/ June 30, 2022
                                               Sebelum Reklasifikasi/            Reklasifikasi/             Setelah Reklasifikasi/
                                                Before Reclassified             Reclassification              As Reclassified
                                                        Rp                             Rp                            Rp

    ASET                                                                                                                                                                 ASSETS
    ASET LANCAR                                                                                                                                              CURRENT ASSETS
    Kas dan Setara Kas                              11.102.743.878.023                                 --        11.102.743.878.023                  Cash and Cash Equivalents
    Investasi Jangka-Pendek                             25.831.595.675                                 --            25.831.595.675                      Short-Term Investments
    Piutang Usaha - Bersih                                                                                                                            Accounts Receivables - Net
       Pihak Berelasi                                2.664.836.145.969                                 --         2.664.836.145.969                             Related Parties
       Pihak Ketiga                                    322.381.305.270                                 --           322.381.305.270                                Third Parties
    Piutang Retensi - Bersih                                                                                                                         Retention Receivables - Net
       Pihak Berelasi                                1.470.725.621.773                                 --         1.470.725.621.773                             Related Parties
       Pihak Ketiga                                    172.502.597.707                                 --           172.502.597.707                                Third Parties
    Piutang Lain-lain lancar - Bersih                                                                                                              Other Current Receivable - Net
       Pihak Berelasi                                9.699.235.381.329                                 --         9.699.235.381.329                             Related Parties
       Pihak Ketiga                                    159.624.980.666                                 --           159.624.980.666                                Third Parties
    Piutang Ventura Bersama                            331.554.295.581                                 --           331.554.295.581                   Joint Ventures Receivables
    Persediaan                                       4.537.269.898.426                                 --         4.537.269.898.426                                    Inventories
    Tagihan Bruto Kepada Pengguna Jasa                                                                                                      Gross Amount Due From Customers
        Pihak Berelasi                               9.184.658.351.062                                 --         9.184.658.351.062                           Related Parties
        Pihak Ketiga                                 1.196.368.934.742                                 --         1.196.368.934.742                             Third Parties
    Aset Keuangan Atas Proyek Konsesi                                                                                                  Financial Asset From Concession Project -
       Bagian Lancar                                    12.637.087.862                                 --            12.637.087.862                             Current Portion
    Pajak Dibayar Dimuka                             1.317.484.801.495                                 --         1.317.484.801.495                                Prepaid Taxes
    Uang Muka dan Biaya Dibayar Dimuka               1.256.017.325.249                                 --         1.256.017.325.249                  Advances and Prepayments
    TOTAL ASET LANCAR                               43.453.872.200.829                                 --        43.453.872.200.829                 TOTAL CURRENT ASSETS

    ASET TIDAK LANCAR                                                                                                                                 NON-CURRENT ASSETS
    Investasi Pada Entitas Asosiasi dan                                                                                                            Investment in Associates and
       Ventura Bersama                               3.943.579.757.016                                 --         3.943.579.757.016                              Joint Ventures
    Properti Investasi                                 317.540.434.513                                 --           317.540.434.513                        Investment Properties
    Investasi Jangka Panjang Lainnya                   868.519.089.820                                 --           868.519.089.820                Other Long-Term Investments
    Aset Tetap - Bersih                              6.572.425.422.193                                 --         6.572.425.422.193                           Fixed Assets - Net
    Aset Hak Guna - Bersih                              51.009.534.853                                 --            51.009.534.853                    Right of Use Assets - Net
    Goodwill                                           926.700.203.060                                 --           926.700.203.060                                      Goodwill
    Aset Tak Berwujud                                                                                                                                           Intangible Assets
       Hak Pengusahaan Jalan Tol                    40.154.500.245.429                                 --        40.154.500.245.429             Toll Road Concession Rights
    Aset Keuangan atas Proyek Konsesi                  329.703.044.449                                 --           329.703.044.449    Financial Assets from Concession Project
    Aset Pajak Tangguhan                                36.285.678.632                                 --            36.285.678.632                          Deferred Tax Assets
    Aset Lain-lain                                     489.801.861.384                                 --           489.801.861.384                                  Other Assets
    TOTAL ASET TIDAK LANCAR                         53.690.065.271.349                                 --        53.690.065.271.349           TOTAL NON-CURRENT ASSETS
    TOTAL ASET                                      97.143.937.472.178                                 --        97.143.937.472.178                             TOTAL ASSETS




                                                                                226
Page 230
                                                                                                       The original consolidated financial statements included herein are in
                                                                                                                                                  the Indonesian language.


 PT WASKITA KARYA (PERSERO) TBK                                                                             PT WASKITA KARYA (PERSERO) TBK
 DAN ENTITAS ANAK                                                                                                       AND ITS SUBSIDIARIES
 CATATAN ATAS LAPORAN KEUANGAN                                                                         NOTES TO THE INTERIM CONSOLIDATED
 KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                                                   FINANCIAL STATEMENTS AS OF JUNE 30, 2023
 31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                                                          AND DECEMBER 31, 2022 AND FOR THE SIX
 ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                                                 MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
 (2022 – DIAUDIT) – Lanjutan                                                                                     (2022 – AUDITED) – Continued
 (Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                                            (Expressed in full Rupiah amount, unless otherwise stated)

                                                                                  30 Juni/ June 30, 2022
                                                       Sebelum Reklasifikasi/         Reklasifikasi/              Setelah Reklasifikasi/
                                                        Before Reclassified          Reclassification               As Reclassified
                                                                Rp                          Rp                             Rp
      LIABILITAS DAN EKUITAS                                                                                                                                       LIABILITIES AND EQUITY
      LIABILITAS JANGKA PENDEK                                                                                                                                       CURRENT LIABILITIES
      Utang Usaha                                                                                                                                                          Accounts Payable
        Pihak Berelasi                                         164.481.653.591                                            164.481.653.591                                  Related Parties
        Pihak Ketiga                                         5.521.304.263.106          1.376.693.436.965               6.897.997.700.071                                     Third Parties
      Utang Bank Jangka Pendek                                                                                                                                       Short-Term Bank Loans
        Pihak Berelasi                                          35.000.000.000            661.614.800.319                 696.614.800.319                                  Related Parties
        Pihak Ketiga                                            62.284.443.053                                             62.284.443.053                                     Third Parties
      Utang Bruto Subkontraktor Jangka Pendek                                                                                                 Short-Term Gross Amount Due to Subcontractors
        Pihak Berelasi                                          67.854.222.564                             --              67.854.222.564                                  Related Parties
        Pihak Ketiga                                         1.570.360.048.409                             --           1.570.360.048.409                                     Third Parties
      Biaya yang Masih Harus Dibayar                         1.441.026.216.050                             --           1.441.026.216.050                                 Accrued Expenses
      Utang Pajak Jangka Pendek                              2.786.388.459.612                             --           2.786.388.459.612                       Short-Term Taxes Payables
      Uang Muka Kontrak Jangka Pendek                                                                                                                       Advances on Short-Term Contract
        Pihak Berelasi                                           2.994.643.035                             --               2.994.643.035                                  Related Parties
        Pihak Ketiga                                           711.789.926.789                             --             711.789.926.789                                     Third Parties
      Utang Bank Jangka Panjang                                                                                                                                         Current Maturities of
        yang Jatuh Tempo dalam Setahun                       3.533.192.945.676                             --           3.533.192.945.676                           Long-Term Bank Loan
      Liabilitas Sewa Guna Usaha Jangka Panjang                                                                                                                         Current Maturities of
        yang Jatuh Tempo dalam Setahun                           3.235.861.958                             --               3.235.861.958                      Long-Term Lease Liabilities
      Surat Utang Jangka Menengah                                            --                                                         --                               Medium Term Notes
      Utang Obligasi Jangka Pendek - Bersih                  3.903.210.188.891          1.803.776.736.110               5.706.986.925.001                    Short-Term Bonds Payable - Net
      Liabilitas Jangka Pendek Lainnya                         650.510.765.637                          --                650.510.765.637                         Other Short-Term Liabilities
      TOTAL LIABILITAS JANGKA PENDEK                        20.453.633.638.371          3.842.084.973.394              24.295.718.611.765                    TOTAL CURRENT LIABILITIES
      LIABILITAS JANGKA PANJANG                                                                                                                                NON-CURRENT LIABILITIES
      Utang Bank Jangka Panjang                                                                                                                                       Long-Term Bank Loans
        Pihak Berelasi                                      28.152.678.647.822                             --          28.152.678.647.822                                   Related Parties
        Pihak Ketiga                                        14.277.486.509.138                             --          14.277.486.509.138                                     Third Parties
      Utang Ventura Bersama Jangka Panjang                                                                                                                  Long-Term Joint Venture Payable
        Pihak Berelasi                                         231.673.760.052                             --             231.673.760.052                                   Related Parties
        Pihak Ketiga                                           891.854.692.000                             --             891.854.692.000                                     Third Parties
      Utang Lembaga Keuangan Non Bank Jangka Panjang                                                                                         Long-Term Loan to Financial Non-Bank Institutions
        Pihak Berelasi                                       1.405.891.831.352                             --           1.405.891.831.352                                   Related Parties
        Pihak Ketiga                                         1.050.540.101.894                             --           1.050.540.101.894                                     Third Parties
      Utang Bruto Jangka Panjang                                                                                                               Long-Term Gross Amount Due to Subcontractors
        Pihak Ketiga                                           463.706.968.943                             --             463.706.968.943                                     Third Parties
      Uang Muka Kontrak Jangka Panjang                                                                                                                      Advances on Long-Term Contract
        Pihak Berelasi                                          10.959.005.525                             --              10.959.005.525                                   Related Parties
        Pihak Ketiga                                           446.651.410.408                             --             446.651.410.408                                     Third Parties
      Liabilitas Pajak Tangguhan                                 5.561.231.317                             --               5.561.231.317                             Deferred Tax Liabilities
      Utang Pajak Jangka Panjang                               439.836.681.434                             --             439.836.681.434                          Long-Term Taxes Payable
      Liabilitas Sewa Guna Usaha Jangka Panjang                 50.147.559.677                             --              50.147.559.677                         Long-Term Lease Liabilities
      Utang Lain-lain Jangka Panjang                                                                                                                               Other Long-Term Payables
        Pihak Ketiga                                         1.312.812.352.669                             --           1.312.812.352.669                                     Third Parties
      Surat Utang Jangka Menengah Jangka Panjang               250.000.000.000                             --             250.000.000.000                     Long-Term Medium Term Notes
      Utang Obligasi Jangka Panjang - Bersih                 6.534.580.815.021                             --           6.534.580.815.021                     Long-Term Bonds Payable - Net
      Sukuk Mudharabah                                       1.148.100.000.000                             --           1.148.100.000.000                                 Sukuk Mudharabah
      Liabilitas Imbalan Kerja                                  80.578.052.151                             --              80.578.052.151                         Employee Benefit Liabilities
      TOTAL LIABILITAS JANGKA PANJANG                       56.753.059.619.403                             --          56.753.059.619.403               TOTAL NON-CURRENT LIABILITIES

      TOTAL LIABILITAS                                      77.206.693.257.774          3.842.084.973.394              81.048.778.231.168                                TOTAL LIABILITIES

      EKUITAS                                                                                                                                                                        EQUITY
      Modal Saham                                            2.880.680.701.600                             --           2.880.680.701.600                                       Share Capital
      Tambahan Modal Disetor                                13.792.016.431.167                             --          13.792.016.431.167                           Additional Paid-in Capital
      Saldo Laba (Defisit)                                                                                                                                         Retained Earnings (Deficit)
        Telah Ditentukan Penggunaannya                        1.732.187.379.878                            --           1.732.187.379.878                                      Appropriated
        Belum Ditentukan Penggunaannya                      (8.142.515.083.469)                            --         (8.142.515.083.469)                                   Unappropriated
      Komponen Ekuitas Lainnya                                  899.621.561.153                            --             899.621.561.153                         Other Components of Equity
      Jumlah Ekuitas yang Dapat Diatribusikan                                                                                                                     Total Equity Attributable to
        Kepada Pemilik Entitas Induk                        11.161.990.990.329                          --             11.161.990.990.329                            Owners of the Parent
      Kepentingan Non-Pengendali                             8.775.253.224.075         (3.842.084.973.394)              4.933.168.250.681                             Non-Controlling Interest
      JUMLAH EKUITAS                                        19.937.244.214.404         (3.842.084.973.394)             16.095.159.241.010                                     TOTAL EQUITY
      JUMLAH LIABILITAS DAN EKUITAS                         97.143.937.472.178                             --          97.143.937.472.178                  TOTAL LIABILITIES AND EQUITY



59.   KELANGSUNGAN USAHA                                                                        59.             GOING CONCERN

      Pada tahun 2022, Grup telah mengalami kerugian                                                            The Group incurred losses amounting to
      sebesar Rp1.672.733.807.060, yang mengakibatkan                                                           Rp1,672,733,807,060 in 2022, which resulted to a
      defisit sebesar Rp8.214.646.146.182 pada 31                                                               deficit of Rp8,214,646,146,182 as at December
      Desember 2022. Selain itu, Grup mengalami                                                                 31, 2022. Furthermore, the Group sustained
      kekurangan arus kas dari aktivitas operasi sebesar                                                        shortage of cash flows from operating activities
      Rp106.580.889.785. Kondisi ini timbul akibat dari                                                         amounting to Rp106,580,889,785 during the year.
      beberapa proyek bermasalah yang memerlukan                                                                These conditions arose due to several problematic
      pendanaan dari utang, sehingga Grup perlu melakukan                                                       projects that required funding from debt, which
      restrukturisasi perjanjian utang, dan memasuki masa                                                       necessitated the restructuring of loans and
      standstill dan pengaturan cash waterfall.                                                                 entering into a standstill period and cash waterfall
                                                                                                                arrangements by the Group.




                                                                                     227
Page 231
                                                                   The original consolidated financial statements included herein are in
                                                                                                              the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
(2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)          (Expressed in full Rupiah amount, unless otherwise stated)

    Faktor-faktor ini, antara lain, menunjukkan adanya                These conditions, among others, indicate
    ketidakpastian material yang dapat menimbulkan                    the existence of a material uncertainty that may
    keraguan signifikan pada kemampuan Grup untuk                     cast significant doubt on the Group’s ability to
    melanjutkan kelangsungan usahanya dan, oleh karena                continue as a going concern and, therefore, it may
    itu, mungkin tidak dapat merealisasikan asetnya dan               be unable to realize its assets and discharge its
    melunasi kewajibannya dalam kegiatan bisnis normal.               liabilities in the normal course of business.
    Laporan keuangan tidak termasuk penyesuaian yang                  The consolidated financial statements do not
    mungkin timbul dari hasil ketidakpastian ini.                     include any adjustments that might result from
                                                                      the outcome of this uncertainty.

    Manajemen secara aktif memantau kondisi keuangan                  Management is actively monitoring the Group’s
    dan kinerja Grup serta mengeksplorasi dan                         financial condition and performance while
    menjalankan strategi-strategi berikut sebagai upaya               continually exploring and implementing strategies
    dalam mengatasi potensi dampak buruk pada kinerja                 in an effort to overcome potential adverse impacts
    keuangan dan keberlangsungan usaha Grup. antara                   on the Group’s financial performance and
    lain sebagai berikut:                                             business continuity, including the following:

    1.   Melaksanakan standstill yang telah disetujui oleh            1.    Implement a standstill as approved by bank
         bank-bank kreditur pada tanggal 20 Maret 2023,                     creditors on March 20, 2023 wherein principal
         dimana penundaan pembayaran pokok dan bunga                        and interest payments of MRA loan facility will
         fasilitas pinjaman MRA, berlaku mulai tanggal 7                    be postponed from February 7 to June 15,
         Februari sampai dengan tanggal 15 Juni 2023 atau                   2023 or until the effective date of the loan
         sampai dengan tanggal efektif perjanjian                           restructuring process is completed. On 30
         restrukturisasi selesai. Pada 30 Juni 2023,                        June 2023, the Company is in the process of
         Perusahaan sedang dalam proses mengajukan                          applying for an extension of the standstill
         perpanjangan masa standstill yang dimulai dari                     period     starting from     16   June      to
         periode 16 Juni sd 11 Agustus 2023.                                11 August 2023.

    2.   Melaksanakan Rapat Umum Pemegang Obligasi                    2.    Implementation of a General Meeting of
         (RUPO) pada tanggal 5 dan 6 September 2023                         Bondholders (RUPO) on September 5 and 6,
         dalam rangka penyampaian skema restrukturisasi                     2023, to submit a restructuring scheme to
         kepada pemegang obligasi.                                          bondholders.

    3.   Menyelesaikan proses reviu MRA bersama dengan                3.    Completed the MRA review process together
         konsorsium konsultan dalam rangka mengkaji                         with a consortium of consultants in order to
         kembali ketentuan-ketentuan yang ada pada                          review the provisions contained in the MRA
         perjanjian MRA menyesuaikan dengan kondisi                         agreement in accordance with the Company's
         terkini Perseroan.                                                 current conditions.

    4.   Mendapatkan persetujuan dari kreditur MRA atas               4.    Obtain approval from MRA creditors for
         proposal skema restrukturisasi.                                    the proposed restructuring scheme.

    5.   Menghentikan        pekerjaan      proyek-proyek             5.    Temporarily suspend work on problematic
         bermasalah sampai diperoleh kejelasan atas                         projects until a definite plan is obtained on
         keberlanjutan dan kelayakan proyek tersebut untuk                  the sustainability and feasibility of such
         menghindari kerugian lebih lanjut.                                 projects to avoid further losses.

    6.   Mengajukan kepada Kantor Pajak permohonan                    6.    Apply for suspension and relief to Tax Office
         penangguhan dan keringanan dalam penyelesaian                      on the settlement of VAT obligations for fiscal
         kewajiban PPN untuk periode 2021 dan 2022.                         years 2021 and 2022.

    Kemampuan         Grup     untuk   mempertahankan                 The Group’s ability to maintain its business as a
    kelangsungan usahanya dan menghadapi tantangan                    going concern and face external challenges
    eksternal bergantung pada kemampuan Grup untuk                    depends on the Group’s ability to generate
    menghasilkan arus kas yang cukup untuk memenuhi                   sufficient cash flow to meet its liabilities on a timely
    liabilitasnya secara tepat waktu, serta kemampuan                 basis, as well as the Group’s ability to have future
    Grup untuk menjalankan operasi yang menguntungkan                 profitable operations and improve its financial
    di masa depan dan meningkatkan posisi keuangannya.                position.

    Laporan keuangan disusun berdasarkan kelangsungan                 The consolidated financial statements have been
    usaha yang mengasumsikan bahwa Grup akan mampu                    prepared on a going concern basis which

                                                          228
Page 232
                                                                         The original consolidated financial statements included herein are in
                                                                                                                    the Indonesian language.


 PT WASKITA KARYA (PERSERO) TBK                                              PT WASKITA KARYA (PERSERO) TBK
 DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
 CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
 KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2023 DAN                    FINANCIAL STATEMENTS AS OF JUNE 30, 2023
 31 DESEMBER 2022 DAN UNTUK PERIODE-PERIODE                           AND DECEMBER 31, 2022 AND FOR THE SIX
 ENAM BULAN YANG BERAKHIR 30 JUNI 2023 DAN 2022                  MONTHS PERIODS ENDED JUNE 30, 2023 AND 2022
 (2022 – DIAUDIT) – Lanjutan                                                      (2022 – AUDITED) – Continued
 (Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)               (Expressed in full Rupiah amount, unless otherwise stated)

      merealisasikan asetnya dan melunasi liabilitasnya                     assumes that the Group will be able to realize its
      dalam kegiatan bisnis normal di masa mendatang.                       assets and discharge its liabilities in the normal
      Asumsi kelangsungan usaha tunduk pada risiko dan                      course of business in the foreseeable future.
      ketidakpastian seperti yang dijelaskan di atas, sehingga              The going concern assumption is subject to risks
      ada kemungkinan bahwa perubahan keadaan yang                          and uncertainties as described above, hence
      merugikan dapat berdampak pada kelangsungan usaha                     there is possibility that adverse changes in
      Grup. Jika perubahan keadaan tersebut terjadi, asumsi                 circumstances may have an impact on
      kelangsungan usaha Grup dapat berubah. Laporan                        the Group’s going concern. If a change in such
      keuangan tidak mencakup penyesuaian yang mungkin                      circumstances occurs, the Group’s going concern
      timbul dari hasil ketidakpastian di atas.                             assumption may be changed.

60.   TANGGUNG     JAWAB             MANAJEMEN  DAN                60. MANAGEMENT      RESPONSIBILITY  AND
      PERSETUJUAN ATAS             LAPORAN KEUANGAN                    APPROVAL     OF  THE   CONSOLIDATED
      KONSOLIDASIAN                                                    FINANCIAL STATEMENTS

      Penyusunan dan penyajian wajar laporan keuangan                      The preparation and fair presentation of
      konsolidasian interim dari halaman 1 sampai 229                      the interim consolidated financial statements on
      merupakan tanggung jawab manajemen, dan telah                        pages 1 to 229 were the responsibilities of
      disetujui oleh Direktur untuk diterbitkan pada tanggal               the management and were approved by
      31 Juli 2023.                                                        the Directors and authorized for issue on
                                                                           July 31, 2023.

                                                             *******




                                                           229
Page 233

          

File

File Open PDF
Source IDX
Size4.13 MB
Published1 Aug 2023
Pages233
Characters1,874,894
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 0 people and organisations named in the text · linked when the evidence is strong

The name pass has not read this document yet.

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

Other files in this announcement 6

↑↓ select ↵ open ⇧↵ see every result