Back to announcement
20230718_ISSP_Penyampaian Prospektus//Informasi Tambahan_31342463.pdf
Other Text extracted ISSPSource file signed link, expires in 15 minutes
Extracted text 2
Page 1
Go To English Page
Nomor Surat 075/VII/CS-ISSP/2023
Nama Perusahaan PT Steel Pipe Industry of Indonesia Tbk
Kode Emiten ISSP
Lampiran 2
Perihal Penyampaian Prospektus
Sehubungan dengan Penawaran Umum Perdana, perseroan menyampaikan Prospektus dan/atau Term Sheet yang
telah mendapatkan persetujuan dari Otoritas Jasa Keuangan sebagaimana terlampir.
Demikian untuk diketahui.
Hormat Kami,
PT Steel Pipe Industry of Indonesia Tbk
Felicia Priska
Asc. Corporate Secretary
PT Steel Pipe Industry of Indonesia Tbk
Jl. Kalibutuh 189-191 Surabaya 60173-Jawa Timur
Telepon : (031) 5320921, 5316921 , Fax : (031) 5310712, 5320290 , www.spindo.
Nama Pengirim Felicia Priska
Jabatan Asc. Corporate Secretary
Tanggal dan Waktu 18-07-2023 11:09
Lampiran 1. 075 Pengantar Intam 2-2.pdf
2. 20230717 - Draft Intam Ringkas_v2 (clean).pdf
Dokumen ini merupakan dokumen resmi PT Steel Pipe Industry of Indonesia Tbk yang tidak memerlukan tanda
tangan karena dihasilkan secara elektronik oleh sistem pelaporan elektronik. PT Steel Pipe Industry of Indonesia
Tbk bertanggung jawab penuh atas informasi yang tertera didalam dokumen ini.
Page 2
Go To Indonesian Page
Letter / Announcement No. 075/VII/CS-ISSP/2023
Issuer Name PT Steel Pipe Industry of Indonesia Tbk
Issuer Code ISSP
Attachment 2
Subject Submission of Company Prospectus
In accordance with the Initial Public Offering, The Issuer had submitted the Company's Prospectus and/or Term Sheet
that has been approved by the Indonesia Financial Service Authority, as attached.
Thus to be informed accordingly.
Respectfully,
PT Steel Pipe Industry of Indonesia Tbk
Felicia Priska
Asc. Corporate Secretary
PT Steel Pipe Industry of Indonesia Tbk
Jl. Kalibutuh 189-191 Surabaya 60173-Jawa Timur
Phone : (031) 5320921, 5316921 , Fax : (031) 5310712, 5320290 , www.spindo.com
Sender Name Felicia Priska
Function Asc. Corporate Secretary
Date and Time 18-07-2023 11:09
Attachment 1. 075 Pengantar Intam 2-2.pdf
2. 20230717 - Draft Intam Ringkas_v2 (clean).pdf
This is an official document of PT Steel Pipe Industry of Indonesia Tbk that does not require a signature as it was
generated electronically by the electronic reporting system. PT Steel Pipe Industry of Indonesia Tbk is fully
responsible for the information contained within this document.
Names mentioned 0 people and organisations named in the text · linked when the evidence is strong
The name pass has not read this document yet.
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
No extraction attempted yet.