Skip to content
Back to announcement

20230714_ANTM_Laporan Penggunaan Dana Hasil Penawaran Umum_31341894.pdf

Other Text extracted ANTM

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 6

Page 1
Go To English Page

 Nomor Surat                        2057/692/KAT/2023

 Nama Perusahaan                    Aneka Tambang Tbk.

 Kode Emiten                        ANTM

 Lampiran                           1

 Perihal                            Laporan Penggunaan Dana Hasil Penawaran Umum


Dana yang diperoleh dari Penawaran Umum IDR

                                                                         Rencana      Realisasi
                                   Jumlah
                                                 Biaya        Hasil     Penggunaa Penggunaa
                                     Hasil
   Jenis                                      Penawaran Realisasi         n Dana       n Dana     Sisa Dana
                      Tanggal    Penawaran
Penawaran Nama Emisi                            Umum         Bersih      Menurut      Menurut      (satuan
                       Efektif      Umum
  Umum                                       (satuan mata (satuan       Prospektus Prospektus mata uang)
                                   (satuan
                                                 uang)     mata uang)     (satuan      (satuan
                                 mata uang)
                                                                        mata uang) mata uang)
                     22 Oktober 5.376.645.14 22.399.124.6 5.354.246.02 5.354.246.02 4.521.109.41 833.136.604
Right Issue ANTM-R
                        2015        5.725         45         1.080         1.080        6.903        .177

Penempatan Sisa Dana

     Jenis
                     Kode Nama
   Penawaran                                                      Penempatan List
                        Efek
     Umum
                                    Sisa Dana                                                       Hubungan
                                                Tingkat Bunga/                      Jangka Waktu
                                  (satuan mata                     Penempatan                        dengan
                                                   Bagi Hasil                       Penyimpanan
                                      uang)                                                        Perusahaan
                                 130.000.000.00                     Bank BTN -
                                                     5        %                       1 Bulan        Afiliasi
                                        0                            Deposito
                                 91.240.043.097     1,9     % Bank BRI - Giro            -           Afiliasi
   Right Issue        ANTM-R
                                  646.551.600      0,035    % Bank BNI - Giro            -           Afiliasi
                                 206.250.000.00                    Bank BRI -
                                                    1,75    %                         6 Bulan        Afiliasi
                                       0                            Deposito
                                 225.000.000.00                   Bank Mandiri -
                                                    1,75    %                         6 Bulan        Afiliasi
                                       0                            Deposito
                                 180.000.000.00                   Bank Mandiri -
                                                    1,75    %                         6 Bulan        Afiliasi
                                       0                            Deposito
Page 2
Rincian Rencana Penawaran Umum

    Jenis
                   Kode Nama
  Penawaran                     Tanggal Efektif                       Rencana List
                      Efek
    Umum
                                                      Hasil
                                                    Realisasi                     Jumlah
                                                     Bersih      Uraian        (satuan mata   Persentase
                                                  (satuan mata                     uang)
                                                      uang)
                                                                    Proyek
                                               3.494.820.000.0 Pembangunan 3.494.820.000.0
                                                                                               65      %
                                                      00       Pabrik Feronikel    00
                                                                Haltim Tahap I
  Right Issue        ANTM-R    22 Oktober 2015                   Pembiayaan
                                                                 Modal Kerja
                                                                 Perseroan /
                                                                    Proyek
                                               1.859.426.021.0 Pengembangan 1.859.426.021.0
                                                                                               35      %
                                                      80            Lainnya        80
                                                                  (termasuk
                                                                Proyek Anode
                                                              Slime & Precious
                                                               Metals Refinery)

Rincian Realisasi Penawaran Umum

    Jenis
                   Kode Nama
  Penawaran                     Tanggal Efektif                       Realisasi List
                      Efek
    Umum
                                                      Hasil
                                                    Realisasi                     Jumlah
                                                     Bersih      Uraian        (satuan mata   Persentase
                                                  (satuan mata                     uang)
                                                      uang)
                                                                    Proyek
                                               3.494.820.000.0 Pembangunan 3.494.788.116.4 99,989997
                                                                                                      %
                                                      00       Pabrik Feronikel    02       86376953
                                                                Haltim Tahap I
  Right Issue        ANTM-R    22 Oktober 2015                   Pembiayaan
                                                                 Modal Kerja
                                                                 Perseroan /
                                                                    Proyek
                                               1.859.426.021.0 Pengembangan 1.026.321.300.5 55,200000
                                                                                                      %
                                                      80            Lainnya        01       76293945
                                                                  (termasuk
                                                                Proyek Anode
                                                              Slime & Precious
                                                               Metals Refinery)

 Demikian untuk diketahui.


 Hormat Kami,
 Aneka Tambang Tbk.




 Syarif Faisal Alkadrie

 Corporate Secretary Division Head
Page 3
Aneka Tambang Tbk.
Gedung. Aneka Tambang
Telepon : 021-7805119; 021-7891234 ; 021-7812635



Nama Pengirim                    Syarif Faisal Alkadrie

Jabatan                          Corporate Secretary Division Head
Tanggal dan Waktu                14-07-2023 17:18

Lampiran                         1. 2057 - Laporan Rights Issue 1H23.pdf


   Dokumen ini merupakan dokumen resmi Aneka Tambang Tbk. yang tidak memerlukan tanda tangan karena
dihasilkan secara elektronik oleh sistem pelaporan elektronik. Aneka Tambang Tbk. bertanggung jawab penuh atas
                                     informasi yang tertera didalam dokumen ini.
Page 4
Go To Indonesian Page

 Announcement Number                     2057/692/KAT/2023

 Issuer Name                             Aneka Tambang Tbk.

 Issuer Code                             ANTM

 Attachment                              1

 Subject                                 Laporan Penggunaan Dana Hasil Penawaran Umum


Fund received form the public offering            IDR


                                         Amount of                                Plan for use Realized
                                          Proceed      Cost of                     of proceed Use of Fund
   Type of                                                              Net                                  Remaining
                 Name of                  from the      Public                   according to according to
    public                  Listing Date                            Realization                               Fund (in
                 Issuance                   Public    Offering (in                     the          the
   offering                                                        (in Currency)                             Currency)
                                         Offering (in Currency)                   Prospectus Prospectus
                                         Currency)                               (in Currency) (in Currency)

                                             5,376,645,14 22,399,124,6 5,354,246,02 5,354,246,02 4,521,109,41 833,136,604
Right Issue      ANTM-R
                                                 5,725         45         1,080        1,080        6,903         ,177


Allocation of Remaining Fund


 Type of public Name / Code of
                                                                        List of allocation
    offering      Securities

                                  Remaining Fund Interest/Yield                                                 Relationship with
                                                                           Allocation        Retention Period
                                   (in Currency)      Rate                                                       the company
                                   130,000,000,00                         Bank BTN -
                                                            5       %                            1 Bulan             Afiliasi
                                         0                                 Deposito
                                   91,240,043,097           1.9     % Bank BRI - Giro               -                Afiliasi
   Right Issue          ANTM-R
                                    646,551,600            0.035    % Bank BNI - Giro               -                Afiliasi
                                   206,250,000,00                        Bank BRI -
                                                           1.75     %                            6 Bulan             Afiliasi
                                         0                                Deposito
                                   225,000,000,00                       Bank Mandiri -
                                                           1.75     %                            6 Bulan             Afiliasi
                                         0                                Deposito
                                   180,000,000,00                       Bank Mandiri -
                                                           1.75     %                            6 Bulan             Afiliasi
                                         0                                Deposito
Page 5
Details of Public Offering Plan


 Type of public Name / Code of
                                     Listing date                            List of plans
    offering      Securities



                                                    Net Realization                    Amount (in
                                                                      Description                   Percentage
                                                     (in Currency)                     Currency)


                                                                         Proyek
                                                    3,494,820,000,0 Pembangunan 3,494,820,000,0
                                                                                                     65      %
                                                           00       Pabrik Feronikel    00
                                                                     Haltim Tahap I
  Right Issue        ANTM-R                                           Pembiayaan
                                                                      Modal Kerja
                                                                      Perseroan /
                                                                         Proyek
                                                    1,859,426,021,0 Pengembangan 1,859,426,021,0
                                                                                                     35      %
                                                           80            Lainnya        80
                                                                       (termasuk
                                                                     Proyek Anode
                                                                   Slime & Precious
                                                                    Metals Refinery)

Details of Public Offering Realization


 Type of Public Name / Code of
                                     Listing Date                          Realization Plan
    Offering      Securities



                                                    Net Realization                    Amount (in
                                                                      Description                   Percentage
                                                     (in Currency)                     Currency)


                                                                         Proyek
                                                    3,494,820,000,0 Pembangunan 3,494,788,116,4 99.9899978
                                                                                                            %
                                                           00       Pabrik Feronikel    02        6376953
                                                                     Haltim Tahap I
  Right Issue        ANTM-R                                           Pembiayaan
                                                                      Modal Kerja
                                                                      Perseroan /
                                                                         Proyek
                                                    1,859,426,021,0 Pengembangan 1,026,321,300,5 55.2000007
                                                                                                            %
                                                           80            Lainnya        01        6293945
                                                                       (termasuk
                                                                     Proyek Anode
                                                                   Slime & Precious
                                                                    Metals Refinery)

Thus to be informed accordingly.


 Respectfully,
 Aneka Tambang Tbk.




 Syarif Faisal Alkadrie

 Corporate Secretary Division Head
Page 6
Aneka Tambang Tbk.
Gedung. Aneka Tambang
Phone : 021-7805119; 021-7891234 ; 021-7812635



Sender Name                         Syarif Faisal Alkadrie

Function                            Corporate Secretary Division Head

Date and Time                       14-07-2023 17:18

Attachment                         1. 2057 - Laporan Rights Issue 1H23.pdf


     This is an official document of Aneka Tambang Tbk. that does not require a signature as it was generated
    electronically by the electronic reporting system. Aneka Tambang Tbk. is fully responsible for the information
                                             contained within this document.

File

File Open PDF
Source IDX
Size0.02 MB
Published14 Jul 2023
Pages6
Characters16,560
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 0 people and organisations named in the text · linked when the evidence is strong

The name pass has not read this document yet.

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result