Skip to content
Back to announcement

20230713_HALO_Laporan Penggunaan Dana Hasil Penawaran Umum_31341417.pdf

Other Text extracted HALO

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 14

Page 1
Go To English Page

 Nomor Surat                        062/HJ-Tbk/VII/2023

 Nama Perusahaan                    PT Haloni Jane Tbk

 Kode Emiten                        HALO

 Lampiran                           1

 Perihal                            Laporan Penggunaan Dana Hasil Penawaran Umum


Dana yang diperoleh dari Penawaran Umum IDR

                                                                          Rencana      Realisasi
                                   Jumlah
                                                  Biaya        Hasil     Penggunaa Penggunaa
                                     Hasil
   Jenis                                       Penawaran Realisasi         n Dana       n Dana     Sisa Dana
                      Tanggal     Penawaran
Penawaran Nama Emisi                             Umum         Bersih      Menurut      Menurut      (satuan
                       Efektif      Umum
  Umum                                        (satuan mata (satuan       Prospektus Prospektus mata uang)
                                   (satuan
                                                  uang)     mata uang)     (satuan      (satuan
                                  mata uang)
                                                                         mata uang) mata uang)
                     08 Februari 113.000.000. 3.356.350.00 109.643.650. 109.643.650. 92.893.008.7 16.750.641.
IPO Saham   HALO
                        2023         000            0          000           000           36         264
                     08 Februari 113.000.000. 3.356.350.00 109.643.650. 109.643.650. 92.893.008.7 16.750.641.
IPO Saham   HALO
                        2023         000            0          000           000           36         264

Penempatan Sisa Dana

     Jenis
                     Kode Nama
   Penawaran                                                       Penempatan List
                        Efek
     Umum
                                    Sisa Dana                                                        Hubungan
                                                  Tingkat Bunga/                     Jangka Waktu
                                  (satuan mata                      Penempatan                        dengan
                                                     Bagi Hasil                      Penyimpanan
  IPO Saham            HALO           uang)                                                         Perusahaan
                                 16.750.641.264       0      % 16.750.641.264             0         pihak Tiga
                                    Sisa Dana                                                        Hubungan
                                                  Tingkat Bunga/                     Jangka Waktu
                                  (satuan mata                      Penempatan                        dengan
                                                     Bagi Hasil                      Penyimpanan
  IPO Saham            HALO           uang)                                                         Perusahaan
                                 16.750.641.264       0      % 16.750.641.264             0         pihak Tiga
Page 2
Rincian Rencana Penawaran Umum

    Jenis
               Kode Nama
  Penawaran                 Tanggal Efektif                           Rencana List
                  Efek
    Umum
                                                    Hasil
                                                  Realisasi                      Jumlah
                                                   Bersih         Uraian      (satuan mata    Persentase
                                                (satuan mata                      uang)
                                                    uang)
                                                              pembelian bahan
                                               109.643.650.00 baku dan bahan
                                                                               65.786.190.000     58,5   %
                                                     0            penunjang
                                                                   produksi
                                                              pembayaran gaji
                                               109.643.650.00 karyawan pabrik                 17,5499992
                                                                               19.735.857.000            %
                                                     0          dan karyawan                   37060547
                                                                    kantor
                                               109.643.650.00 pembelian bahan
                                 08 Februari                                   10.964.365.000     9,75   %
  IPO Saham       HALO                               0          bakar / energi
                                    2023       109.643.650.00 pemeliharaan                    4,88000011
                                                                                5.482.182.500            %
                                                     0           mesin pabrik                   4440918
                                                               perbaikan dan
                                                              pembelian spare
                                               109.643.650.00                                 2,93000006
                                                                  part (suku    3.289.309.500            %
                                                     0                                          6757202
                                                              cadang) mesin di
                                                                    pabrik
                                                                pemeliharaan
                                                               dan perbaikan
                                               109.643.650.00                                 1,95000004
                                                                  kendaraan     2.192.873.000            %
                                                     0                                         76837158
                                                                 operasional
                                                                    pabrik
                                                                    Biaya
                                               109.643.650.00                                 1,95000004
                                                              transportasi dan 2.192.873.000             %
                                                     0                                         76837158
                                                                 pengiriman
Page 3
  Jenis
            Kode Nama
Penawaran               Tanggal Efektif                          Rencana List
               Efek
  Umum
                                               Hasil
                                             Realisasi                      Jumlah
                                              Bersih         Uraian      (satuan mata    Persentase
                                           (satuan mata                      uang)
                                               uang)
                                                         pembelian bahan
                                          109.643.650.00 baku dan bahan
                                                                          65.786.190.000     58,5   %
                                                0            penunjang
                                                              produksi
                                                         pembayaran gaji
                                          109.643.650.00 karyawan pabrik                 17,5499992
                                                                          19.735.857.000            %
                                                0          dan karyawan                   37060547
                                                               kantor
                                          109.643.650.00 pembelian bahan
                         08 Februari                                      10.964.365.000     9,75   %
IPO Saham     HALO                              0          bakar / energi
                            2023          109.643.650.00 pemeliharaan                    4,88000011
                                                                           5.482.182.500            %
                                                0           mesin pabrik                   4440918
                                                          perbaikan dan
                                                         pembelian spare
                                          109.643.650.00                                 2,93000006
                                                             part (suku    3.289.309.500            %
                                                0                                          6757202
                                                         cadang) mesin di
                                                               pabrik
                                                           pemeliharaan
                                                          dan perbaikan
                                          109.643.650.00                                 1,95000004
                                                             kendaraan     2.192.873.000            %
                                                0                                         76837158
                                                            operasional
                                                               pabrik
                                                               Biaya
                                          109.643.650.00                                 1,95000004
                                                         transportasi dan 2.192.873.000             %
                                                0                                         76837158
                                                            pengiriman
Page 4
Rincian Realisasi Penawaran Umum

    Jenis
                Kode Nama
  Penawaran                   Tanggal Efektif                           Realisasi List
                   Efek
    Umum
                                                     Hasil
                                                   Realisasi                        Jumlah
                                                    Bersih         Uraian        (satuan mata   Persentase
                                                 (satuan mata                        uang)
                                                     uang)
                                                               pembelian bahan
                                                109.643.650.00 baku dan bahan
                                                                                65.786.190.000     100     %
                                                      0            penunjang
                                                                    produksi
                                                               pembayaran gaji
                                                109.643.650.00 karyawan pabrik                 76,980003
                                                                                15.192.710.944             %
                                                      0          dan karyawan                    3569336
                                                                     kantor
                                                109.643.650.00 pembelian bahan                 75,839996
                                                                                 8.315.154.502             %
                               08 Februari            0          bakar / energi                 33789062
  IPO Saham        HALO
                                  2023          109.643.650.00 pemeliharaan                    1,4500000
                                                                                   79.468.000              %
                                                      0           mesin pabrik                 476837158
                                                                perbaikan dan
                                                               pembelian spare
                                                109.643.650.00                                 40,360000
                                                                   part (suku    1.327.683.432             %
                                                      0                                         61035156
                                                               cadang) mesin di
                                                                     pabrik
                                                                 pemeliharaan
                                                                dan perbaikan
                                                109.643.650.00                                 2,1600000
                                                                   kendaraan       47.345.960              %
                                                      0                                        858306885
                                                                  operasional
                                                                     pabrik
                                                                     Biaya
                                                109.643.650.00                                 97,790000
                                                               transportasi dan 2.144.455.897              %
                                                      0                                         91552734
                                                                  pengiriman
Page 5
  Jenis
            Kode Nama
Penawaran               Tanggal Efektif                           Realisasi List
               Efek
  Umum
                                               Hasil
                                             Realisasi                        Jumlah
                                              Bersih         Uraian        (satuan mata   Persentase
                                           (satuan mata                        uang)
                                               uang)
                                                         pembelian bahan
                                          109.643.650.00 baku dan bahan
                                                                          65.786.190.000     100     %
                                                0            penunjang
                                                              produksi
                                                         pembayaran gaji
                                          109.643.650.00 karyawan pabrik                 76,980003
                                                                          15.192.710.944             %
                                                0          dan karyawan                    3569336
                                                               kantor
                                          109.643.650.00 pembelian bahan                 75,839996
                                                                           8.315.154.502             %
                         08 Februari            0          bakar / energi                 33789062
IPO Saham     HALO
                            2023          109.643.650.00 pemeliharaan                    1,4500000
                                                                             79.468.000              %
                                                0           mesin pabrik                 476837158
                                                          perbaikan dan
                                                         pembelian spare
                                          109.643.650.00                                 40,360000
                                                             part (suku    1.327.683.432             %
                                                0                                         61035156
                                                         cadang) mesin di
                                                               pabrik
                                                           pemeliharaan
                                                          dan perbaikan
                                          109.643.650.00                                 2,1600000
                                                             kendaraan       47.345.960              %
                                                0                                        858306885
                                                            operasional
                                                               pabrik
                                                               Biaya
                                          109.643.650.00                                 97,790000
                                                         transportasi dan 2.144.455.897              %
                                                0                                         91552734
                                                            pengiriman
Page 6
Rincian Biaya Penawaran Umum

   Jenis                                               Jumlah                                   Jumlah
                                       Tanggal                                                            Persenta
 Penawaran         Kode Efek                            Hasil              Uraian            (Satuan Mata
                                        Efektif                                                              se
   Umum                                               Penawaran                                  Uang)
 IPO Saham           HALO            08 Februari    113.000.000.00a. biaya jasa penjaminan
                                        2023              0       (underwriting fee);
                                                                                             409.310.976     0,36    %


                                                                  b. biaya jasa
                                                                  penyelenggaraan
                                                                                             1.009.633.740   0,89    %
                                                                  (management fee);

                                                                  c. biaya jasa penjualan
                                                                  (selling fee);
                                                                                             100.053.794     0,09    %


                                                                  d. biaya jasa profesi
                                                                  penunjang pasar modal;
                                                                                             1.573.573.306   1,39    %


                                                                  e. biaya jasa lembaga
                                                                  penunjang pasar modal;
                                                                                             109.149.593     0,1     %
                                                                  dan

                                                                  f. biaya jasa konsultasi
                                                                  keuangan (financial
                                                                                                  0           0      %
                                                                  advisory fee).

                                                                  g. Biaya lain-lain yang
                                                                  dapat diatribusikan
                                                                                             154.628.591     0,14    %
                                                                  langsung sebagai biaya
                                                                  emisi***)

Demikian untuk diketahui.


Hormat Kami,
PT Haloni Jane Tbk




Juliana

Direktur




PT Haloni Jane Tbk
Jl Raya Serang km. 13,8
Telepon : +62 21 596 2435, Fax : , http://halonijane.co.id/



Nama Pengirim                        Juliana

Jabatan                              Direktur
Tanggal dan Waktu                    14-07-2023 15:37

Lampiran                            1. Laporan Realisasi per 30 Juni 2023 sent.pdf
Page 7
   Dokumen ini merupakan dokumen resmi PT Haloni Jane Tbk yang tidak memerlukan tanda tangan karena
dihasilkan secara elektronik oleh sistem pelaporan elektronik. PT Haloni Jane Tbk bertanggung jawab penuh atas
                                    informasi yang tertera didalam dokumen ini.
Page 8
Go To Indonesian Page

 Announcement Number                     062/HJ-Tbk/VII/2023

 Issuer Name                             PT Haloni Jane Tbk

 Issuer Code                             HALO

 Attachment                              1

 Subject                                 Laporan Penggunaan Dana Hasil Penawaran Umum


Fund received form the public offering            IDR


                                        Amount of                                Plan for use Realized
                                         Proceed      Cost of                     of proceed Use of Fund
   Type of                                                             Net                                  Remaining
                Name of                  from the      Public                   according to according to
    public                 Listing Date                            Realization                               Fund (in
                Issuance                   Public    Offering (in                     the          the
   offering                                                       (in Currency)                             Currency)
                                        Offering (in Currency)                   Prospectus Prospectus
                                        Currency)                               (in Currency) (in Currency)

                                             113,000,000, 3,356,350,00 109,643,650, 109,643,650, 92,893,008,7 16,750,641,
IPO Saham         HALO
                                                 000            0          000          000           36          264
                                             113,000,000, 3,356,350,00 109,643,650, 109,643,650, 92,893,008,7 16,750,641,
IPO Saham         HALO
                                                 000            0          000          000           36          264


Allocation of Remaining Fund


 Type of public Name / Code of
                                                                        List of allocation
    offering      Securities

                                  Remaining Fund Interest/Yield                                                 Relationship with
                                                                           Allocation        Retention Period
                                   (in Currency)      Rate                                                       the company
  IPO Saham             HALO

                                  16,750,641,264            0       % 16.750.641.264                0              pihak Tiga

                                  Remaining Fund Interest/Yield                                                 Relationship with
                                                                           Allocation        Retention Period
                                   (in Currency)      Rate                                                       the company
  IPO Saham             HALO

                                  16,750,641,264            0       % 16.750.641.264                0              pihak Tiga
Page 9
Details of Public Offering Plan


 Type of public Name / Code of
                                  Listing date                            List of plans
    offering      Securities



                                                 Net Realization                    Amount (in
                                                                   Description                   Percentage
                                                  (in Currency)                     Currency)


                                                                pembelian bahan
                                                 109,643,650,00 baku dan bahan
                                                                                 65,786,190,000     58.5   %
                                                       0            penunjang
                                                                     produksi
                                                                pembayaran gaji
                                                 109,643,650,00 karyawan pabrik                 17.5499992
                                                                                 19,735,857,000            %
                                                       0          dan karyawan                   37060547
                                                                      kantor
                                                 109,643,650,00 pembelian bahan
                                                                                 10,964,365,000     9.75   %
  IPO Saham            HALO                            0          bakar / energi
                                                 109,643,650,00 pemeliharaan                    4.88000011
                                                                                  5,482,182,500            %
                                                       0           mesin pabrik                   4440918
                                                                 perbaikan dan
                                                                pembelian spare
                                                 109,643,650,00                                 2.93000006
                                                                    part (suku    3,289,309,500            %
                                                       0                                          6757202
                                                                cadang) mesin di
                                                                      pabrik
                                                                  pemeliharaan
                                                                 dan perbaikan
                                                 109,643,650,00                                 1.95000004
                                                                    kendaraan     2,192,873,000            %
                                                       0                                         76837158
                                                                   operasional
                                                                      pabrik
                                                                      Biaya
                                                 109,643,650,00                                 1.95000004
                                                                transportasi dan 2,192,873,000             %
                                                       0                                         76837158
                                                                   pengiriman
Page 10
Type of public Name / Code of
                                Listing date                            List of plans
   offering      Securities



                                               Net Realization                    Amount (in
                                                                 Description                   Percentage
                                                (in Currency)                     Currency)


                                                              pembelian bahan
                                               109,643,650,00 baku dan bahan
                                                                               65,786,190,000     58.5   %
                                                     0            penunjang
                                                                   produksi
                                                              pembayaran gaji
                                               109,643,650,00 karyawan pabrik                 17.5499992
                                                                               19,735,857,000            %
                                                     0          dan karyawan                   37060547
                                                                    kantor
                                               109,643,650,00 pembelian bahan
                                                                               10,964,365,000     9.75   %
 IPO Saham         HALO                              0          bakar / energi
                                               109,643,650,00 pemeliharaan                    4.88000011
                                                                                5,482,182,500            %
                                                     0           mesin pabrik                   4440918
                                                               perbaikan dan
                                                              pembelian spare
                                               109,643,650,00                                 2.93000006
                                                                  part (suku    3,289,309,500            %
                                                     0                                          6757202
                                                              cadang) mesin di
                                                                    pabrik
                                                                pemeliharaan
                                                               dan perbaikan
                                               109,643,650,00                                 1.95000004
                                                                  kendaraan     2,192,873,000            %
                                                     0                                         76837158
                                                                 operasional
                                                                    pabrik
                                                                    Biaya
                                               109,643,650,00                                 1.95000004
                                                              transportasi dan 2,192,873,000             %
                                                     0                                         76837158
                                                                 pengiriman
Page 11
Details of Public Offering Realization


 Type of Public Name / Code of
                                     Listing Date                          Realization Plan
    Offering      Securities



                                                    Net Realization                   Amount (in
                                                                      Description                  Percentage
                                                     (in Currency)                    Currency)


                                                                   pembelian bahan
                                                    109,643,650,00 baku dan bahan
                                                                                    65,786,190,000     100    %
                                                          0            penunjang
                                                                        produksi
                                                                   pembayaran gaji
                                                    109,643,650,00 karyawan pabrik                 76.9800033
                                                                                    15,192,710,944            %
                                                          0          dan karyawan                    569336
                                                                         kantor
                                                    109,643,650,00 pembelian bahan                 75.8399963
                                                                                     8,315,154,502            %
  IPO Saham            HALO                               0          bakar / energi                  3789062
                                                    109,643,650,00 pemeliharaan                    1.45000004
                                                                                       79,468,000             %
                                                          0           mesin pabrik                  76837158
                                                                    perbaikan dan
                                                                   pembelian spare
                                                    109,643,650,00                                 40.3600006
                                                                       part (suku    1,327,683,432            %
                                                          0                                          1035156
                                                                   cadang) mesin di
                                                                         pabrik
                                                                     pemeliharaan
                                                                    dan perbaikan
                                                    109,643,650,00                                 2.16000008
                                                                       kendaraan       47,345,960             %
                                                          0                                         58306885
                                                                      operasional
                                                                         pabrik
                                                                         Biaya
                                                    109,643,650,00                                 97.7900009
                                                                   transportasi dan 2,144,455,897             %
                                                          0                                          1552734
                                                                      pengiriman
Page 12
Type of Public Name / Code of
                                Listing Date                          Realization Plan
   Offering      Securities



                                               Net Realization                   Amount (in
                                                                 Description                  Percentage
                                                (in Currency)                    Currency)


                                                              pembelian bahan
                                               109,643,650,00 baku dan bahan
                                                                               65,786,190,000     100    %
                                                     0            penunjang
                                                                   produksi
                                                              pembayaran gaji
                                               109,643,650,00 karyawan pabrik                 76.9800033
                                                                               15,192,710,944            %
                                                     0          dan karyawan                    569336
                                                                    kantor
                                               109,643,650,00 pembelian bahan                 75.8399963
                                                                                8,315,154,502            %
 IPO Saham         HALO                              0          bakar / energi                  3789062
                                               109,643,650,00 pemeliharaan                    1.45000004
                                                                                  79,468,000             %
                                                     0           mesin pabrik                  76837158
                                                               perbaikan dan
                                                              pembelian spare
                                               109,643,650,00                                 40.3600006
                                                                  part (suku    1,327,683,432            %
                                                     0                                          1035156
                                                              cadang) mesin di
                                                                    pabrik
                                                                pemeliharaan
                                                               dan perbaikan
                                               109,643,650,00                                 2.16000008
                                                                  kendaraan       47,345,960             %
                                                     0                                         58306885
                                                                 operasional
                                                                    pabrik
                                                                    Biaya
                                               109,643,650,00                                 97.7900009
                                                              transportasi dan 2,144,455,897             %
                                                     0                                          1552734
                                                                 pengiriman
Page 13
Details of Cost of Public Offering

                                                       Amount of
Type of Public                                                                                   Amount (in   Percenta
                  Securities Code     Listing Date   Proceed for the     Description
   Offering                                                                                      Currency)       ge
                                                     Public Offering
  IPO Saham            HALO                          113,000,000,00a. Underwriting fee
                                                            0
                                                                                                409,310,976 0.36         %


                                                                   b. Management fee
                                                                                                1,009,633,740 0.89       %


                                                                   c. Selling fee
                                                                                                100,053,794 0.09         %


                                                                   d. Capital Market
                                                                   Supporting Profession
                                                                                                1,573,573,306 1.39       %
                                                                   fee

                                                                   e. Capital Market
                                                                   Supporting Institution fee
                                                                                                109,149,593 0.1          %


                                                                   f. Financial advisory fee
                                                                                                      0       0          %


                                                                   g. Other fees which can
                                                                   be directly attributed as
                                                                                                154,628,591 0.14         %
                                                                   securities issuance fees


Thus to be informed accordingly.


 Respectfully,
 PT Haloni Jane Tbk




 Juliana

 Direktur




 PT Haloni Jane Tbk
 Jl Raya Serang km. 13,8
 Phone : +62 21 596 2435, Fax : , http://halonijane.co.id/



 Sender Name                         Juliana

 Function                            Direktur

 Date and Time                       14-07-2023 15:37

 Attachment                          1. Laporan Realisasi per 30 Juni 2023 sent.pdf
Page 14
 This is an official document of PT Haloni Jane Tbk that does not require a signature as it was generated
electronically by the electronic reporting system. PT Haloni Jane Tbk is fully responsible for the information
                                        contained within this document.

File

File Open PDF
Source IDX
Size0.04 MB
Published14 Jul 2023
Pages14
Characters42,964
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 0 people and organisations named in the text · linked when the evidence is strong

The name pass has not read this document yet.

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result