Back to announcement
20230713_HALO_Laporan Penggunaan Dana Hasil Penawaran Umum_31341417.pdf
Other Text extracted HALOSource file signed link, expires in 15 minutes
Extracted text 14
Page 1
Go To English Page
Nomor Surat 062/HJ-Tbk/VII/2023
Nama Perusahaan PT Haloni Jane Tbk
Kode Emiten HALO
Lampiran 1
Perihal Laporan Penggunaan Dana Hasil Penawaran Umum
Dana yang diperoleh dari Penawaran Umum IDR
Rencana Realisasi
Jumlah
Biaya Hasil Penggunaa Penggunaa
Hasil
Jenis Penawaran Realisasi n Dana n Dana Sisa Dana
Tanggal Penawaran
Penawaran Nama Emisi Umum Bersih Menurut Menurut (satuan
Efektif Umum
Umum (satuan mata (satuan Prospektus Prospektus mata uang)
(satuan
uang) mata uang) (satuan (satuan
mata uang)
mata uang) mata uang)
08 Februari 113.000.000. 3.356.350.00 109.643.650. 109.643.650. 92.893.008.7 16.750.641.
IPO Saham HALO
2023 000 0 000 000 36 264
08 Februari 113.000.000. 3.356.350.00 109.643.650. 109.643.650. 92.893.008.7 16.750.641.
IPO Saham HALO
2023 000 0 000 000 36 264
Penempatan Sisa Dana
Jenis
Kode Nama
Penawaran Penempatan List
Efek
Umum
Sisa Dana Hubungan
Tingkat Bunga/ Jangka Waktu
(satuan mata Penempatan dengan
Bagi Hasil Penyimpanan
IPO Saham HALO uang) Perusahaan
16.750.641.264 0 % 16.750.641.264 0 pihak Tiga
Sisa Dana Hubungan
Tingkat Bunga/ Jangka Waktu
(satuan mata Penempatan dengan
Bagi Hasil Penyimpanan
IPO Saham HALO uang) Perusahaan
16.750.641.264 0 % 16.750.641.264 0 pihak Tiga
Page 2
Rincian Rencana Penawaran Umum
Jenis
Kode Nama
Penawaran Tanggal Efektif Rencana List
Efek
Umum
Hasil
Realisasi Jumlah
Bersih Uraian (satuan mata Persentase
(satuan mata uang)
uang)
pembelian bahan
109.643.650.00 baku dan bahan
65.786.190.000 58,5 %
0 penunjang
produksi
pembayaran gaji
109.643.650.00 karyawan pabrik 17,5499992
19.735.857.000 %
0 dan karyawan 37060547
kantor
109.643.650.00 pembelian bahan
08 Februari 10.964.365.000 9,75 %
IPO Saham HALO 0 bakar / energi
2023 109.643.650.00 pemeliharaan 4,88000011
5.482.182.500 %
0 mesin pabrik 4440918
perbaikan dan
pembelian spare
109.643.650.00 2,93000006
part (suku 3.289.309.500 %
0 6757202
cadang) mesin di
pabrik
pemeliharaan
dan perbaikan
109.643.650.00 1,95000004
kendaraan 2.192.873.000 %
0 76837158
operasional
pabrik
Biaya
109.643.650.00 1,95000004
transportasi dan 2.192.873.000 %
0 76837158
pengiriman
Page 3
Jenis
Kode Nama
Penawaran Tanggal Efektif Rencana List
Efek
Umum
Hasil
Realisasi Jumlah
Bersih Uraian (satuan mata Persentase
(satuan mata uang)
uang)
pembelian bahan
109.643.650.00 baku dan bahan
65.786.190.000 58,5 %
0 penunjang
produksi
pembayaran gaji
109.643.650.00 karyawan pabrik 17,5499992
19.735.857.000 %
0 dan karyawan 37060547
kantor
109.643.650.00 pembelian bahan
08 Februari 10.964.365.000 9,75 %
IPO Saham HALO 0 bakar / energi
2023 109.643.650.00 pemeliharaan 4,88000011
5.482.182.500 %
0 mesin pabrik 4440918
perbaikan dan
pembelian spare
109.643.650.00 2,93000006
part (suku 3.289.309.500 %
0 6757202
cadang) mesin di
pabrik
pemeliharaan
dan perbaikan
109.643.650.00 1,95000004
kendaraan 2.192.873.000 %
0 76837158
operasional
pabrik
Biaya
109.643.650.00 1,95000004
transportasi dan 2.192.873.000 %
0 76837158
pengiriman
Page 4
Rincian Realisasi Penawaran Umum
Jenis
Kode Nama
Penawaran Tanggal Efektif Realisasi List
Efek
Umum
Hasil
Realisasi Jumlah
Bersih Uraian (satuan mata Persentase
(satuan mata uang)
uang)
pembelian bahan
109.643.650.00 baku dan bahan
65.786.190.000 100 %
0 penunjang
produksi
pembayaran gaji
109.643.650.00 karyawan pabrik 76,980003
15.192.710.944 %
0 dan karyawan 3569336
kantor
109.643.650.00 pembelian bahan 75,839996
8.315.154.502 %
08 Februari 0 bakar / energi 33789062
IPO Saham HALO
2023 109.643.650.00 pemeliharaan 1,4500000
79.468.000 %
0 mesin pabrik 476837158
perbaikan dan
pembelian spare
109.643.650.00 40,360000
part (suku 1.327.683.432 %
0 61035156
cadang) mesin di
pabrik
pemeliharaan
dan perbaikan
109.643.650.00 2,1600000
kendaraan 47.345.960 %
0 858306885
operasional
pabrik
Biaya
109.643.650.00 97,790000
transportasi dan 2.144.455.897 %
0 91552734
pengiriman
Page 5
Jenis
Kode Nama
Penawaran Tanggal Efektif Realisasi List
Efek
Umum
Hasil
Realisasi Jumlah
Bersih Uraian (satuan mata Persentase
(satuan mata uang)
uang)
pembelian bahan
109.643.650.00 baku dan bahan
65.786.190.000 100 %
0 penunjang
produksi
pembayaran gaji
109.643.650.00 karyawan pabrik 76,980003
15.192.710.944 %
0 dan karyawan 3569336
kantor
109.643.650.00 pembelian bahan 75,839996
8.315.154.502 %
08 Februari 0 bakar / energi 33789062
IPO Saham HALO
2023 109.643.650.00 pemeliharaan 1,4500000
79.468.000 %
0 mesin pabrik 476837158
perbaikan dan
pembelian spare
109.643.650.00 40,360000
part (suku 1.327.683.432 %
0 61035156
cadang) mesin di
pabrik
pemeliharaan
dan perbaikan
109.643.650.00 2,1600000
kendaraan 47.345.960 %
0 858306885
operasional
pabrik
Biaya
109.643.650.00 97,790000
transportasi dan 2.144.455.897 %
0 91552734
pengiriman
Page 6
Rincian Biaya Penawaran Umum
Jenis Jumlah Jumlah
Tanggal Persenta
Penawaran Kode Efek Hasil Uraian (Satuan Mata
Efektif se
Umum Penawaran Uang)
IPO Saham HALO 08 Februari 113.000.000.00a. biaya jasa penjaminan
2023 0 (underwriting fee);
409.310.976 0,36 %
b. biaya jasa
penyelenggaraan
1.009.633.740 0,89 %
(management fee);
c. biaya jasa penjualan
(selling fee);
100.053.794 0,09 %
d. biaya jasa profesi
penunjang pasar modal;
1.573.573.306 1,39 %
e. biaya jasa lembaga
penunjang pasar modal;
109.149.593 0,1 %
dan
f. biaya jasa konsultasi
keuangan (financial
0 0 %
advisory fee).
g. Biaya lain-lain yang
dapat diatribusikan
154.628.591 0,14 %
langsung sebagai biaya
emisi***)
Demikian untuk diketahui.
Hormat Kami,
PT Haloni Jane Tbk
Juliana
Direktur
PT Haloni Jane Tbk
Jl Raya Serang km. 13,8
Telepon : +62 21 596 2435, Fax : , http://halonijane.co.id/
Nama Pengirim Juliana
Jabatan Direktur
Tanggal dan Waktu 14-07-2023 15:37
Lampiran 1. Laporan Realisasi per 30 Juni 2023 sent.pdf
Page 7
Dokumen ini merupakan dokumen resmi PT Haloni Jane Tbk yang tidak memerlukan tanda tangan karena
dihasilkan secara elektronik oleh sistem pelaporan elektronik. PT Haloni Jane Tbk bertanggung jawab penuh atas
informasi yang tertera didalam dokumen ini.
Page 8
Go To Indonesian Page
Announcement Number 062/HJ-Tbk/VII/2023
Issuer Name PT Haloni Jane Tbk
Issuer Code HALO
Attachment 1
Subject Laporan Penggunaan Dana Hasil Penawaran Umum
Fund received form the public offering IDR
Amount of Plan for use Realized
Proceed Cost of of proceed Use of Fund
Type of Net Remaining
Name of from the Public according to according to
public Listing Date Realization Fund (in
Issuance Public Offering (in the the
offering (in Currency) Currency)
Offering (in Currency) Prospectus Prospectus
Currency) (in Currency) (in Currency)
113,000,000, 3,356,350,00 109,643,650, 109,643,650, 92,893,008,7 16,750,641,
IPO Saham HALO
000 0 000 000 36 264
113,000,000, 3,356,350,00 109,643,650, 109,643,650, 92,893,008,7 16,750,641,
IPO Saham HALO
000 0 000 000 36 264
Allocation of Remaining Fund
Type of public Name / Code of
List of allocation
offering Securities
Remaining Fund Interest/Yield Relationship with
Allocation Retention Period
(in Currency) Rate the company
IPO Saham HALO
16,750,641,264 0 % 16.750.641.264 0 pihak Tiga
Remaining Fund Interest/Yield Relationship with
Allocation Retention Period
(in Currency) Rate the company
IPO Saham HALO
16,750,641,264 0 % 16.750.641.264 0 pihak Tiga
Page 9
Details of Public Offering Plan
Type of public Name / Code of
Listing date List of plans
offering Securities
Net Realization Amount (in
Description Percentage
(in Currency) Currency)
pembelian bahan
109,643,650,00 baku dan bahan
65,786,190,000 58.5 %
0 penunjang
produksi
pembayaran gaji
109,643,650,00 karyawan pabrik 17.5499992
19,735,857,000 %
0 dan karyawan 37060547
kantor
109,643,650,00 pembelian bahan
10,964,365,000 9.75 %
IPO Saham HALO 0 bakar / energi
109,643,650,00 pemeliharaan 4.88000011
5,482,182,500 %
0 mesin pabrik 4440918
perbaikan dan
pembelian spare
109,643,650,00 2.93000006
part (suku 3,289,309,500 %
0 6757202
cadang) mesin di
pabrik
pemeliharaan
dan perbaikan
109,643,650,00 1.95000004
kendaraan 2,192,873,000 %
0 76837158
operasional
pabrik
Biaya
109,643,650,00 1.95000004
transportasi dan 2,192,873,000 %
0 76837158
pengiriman
Page 10
Type of public Name / Code of
Listing date List of plans
offering Securities
Net Realization Amount (in
Description Percentage
(in Currency) Currency)
pembelian bahan
109,643,650,00 baku dan bahan
65,786,190,000 58.5 %
0 penunjang
produksi
pembayaran gaji
109,643,650,00 karyawan pabrik 17.5499992
19,735,857,000 %
0 dan karyawan 37060547
kantor
109,643,650,00 pembelian bahan
10,964,365,000 9.75 %
IPO Saham HALO 0 bakar / energi
109,643,650,00 pemeliharaan 4.88000011
5,482,182,500 %
0 mesin pabrik 4440918
perbaikan dan
pembelian spare
109,643,650,00 2.93000006
part (suku 3,289,309,500 %
0 6757202
cadang) mesin di
pabrik
pemeliharaan
dan perbaikan
109,643,650,00 1.95000004
kendaraan 2,192,873,000 %
0 76837158
operasional
pabrik
Biaya
109,643,650,00 1.95000004
transportasi dan 2,192,873,000 %
0 76837158
pengiriman
Page 11
Details of Public Offering Realization
Type of Public Name / Code of
Listing Date Realization Plan
Offering Securities
Net Realization Amount (in
Description Percentage
(in Currency) Currency)
pembelian bahan
109,643,650,00 baku dan bahan
65,786,190,000 100 %
0 penunjang
produksi
pembayaran gaji
109,643,650,00 karyawan pabrik 76.9800033
15,192,710,944 %
0 dan karyawan 569336
kantor
109,643,650,00 pembelian bahan 75.8399963
8,315,154,502 %
IPO Saham HALO 0 bakar / energi 3789062
109,643,650,00 pemeliharaan 1.45000004
79,468,000 %
0 mesin pabrik 76837158
perbaikan dan
pembelian spare
109,643,650,00 40.3600006
part (suku 1,327,683,432 %
0 1035156
cadang) mesin di
pabrik
pemeliharaan
dan perbaikan
109,643,650,00 2.16000008
kendaraan 47,345,960 %
0 58306885
operasional
pabrik
Biaya
109,643,650,00 97.7900009
transportasi dan 2,144,455,897 %
0 1552734
pengiriman
Page 12
Type of Public Name / Code of
Listing Date Realization Plan
Offering Securities
Net Realization Amount (in
Description Percentage
(in Currency) Currency)
pembelian bahan
109,643,650,00 baku dan bahan
65,786,190,000 100 %
0 penunjang
produksi
pembayaran gaji
109,643,650,00 karyawan pabrik 76.9800033
15,192,710,944 %
0 dan karyawan 569336
kantor
109,643,650,00 pembelian bahan 75.8399963
8,315,154,502 %
IPO Saham HALO 0 bakar / energi 3789062
109,643,650,00 pemeliharaan 1.45000004
79,468,000 %
0 mesin pabrik 76837158
perbaikan dan
pembelian spare
109,643,650,00 40.3600006
part (suku 1,327,683,432 %
0 1035156
cadang) mesin di
pabrik
pemeliharaan
dan perbaikan
109,643,650,00 2.16000008
kendaraan 47,345,960 %
0 58306885
operasional
pabrik
Biaya
109,643,650,00 97.7900009
transportasi dan 2,144,455,897 %
0 1552734
pengiriman
Page 13
Details of Cost of Public Offering
Amount of
Type of Public Amount (in Percenta
Securities Code Listing Date Proceed for the Description
Offering Currency) ge
Public Offering
IPO Saham HALO 113,000,000,00a. Underwriting fee
0
409,310,976 0.36 %
b. Management fee
1,009,633,740 0.89 %
c. Selling fee
100,053,794 0.09 %
d. Capital Market
Supporting Profession
1,573,573,306 1.39 %
fee
e. Capital Market
Supporting Institution fee
109,149,593 0.1 %
f. Financial advisory fee
0 0 %
g. Other fees which can
be directly attributed as
154,628,591 0.14 %
securities issuance fees
Thus to be informed accordingly.
Respectfully,
PT Haloni Jane Tbk
Juliana
Direktur
PT Haloni Jane Tbk
Jl Raya Serang km. 13,8
Phone : +62 21 596 2435, Fax : , http://halonijane.co.id/
Sender Name Juliana
Function Direktur
Date and Time 14-07-2023 15:37
Attachment 1. Laporan Realisasi per 30 Juni 2023 sent.pdf
Page 14
This is an official document of PT Haloni Jane Tbk that does not require a signature as it was generated
electronically by the electronic reporting system. PT Haloni Jane Tbk is fully responsible for the information
contained within this document.
Names mentioned 0 people and organisations named in the text · linked when the evidence is strong
The name pass has not read this document yet.
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
No extraction attempted yet.