Skip to content
Back to announcement

20230714_BALI_Laporan Penggunaan Dana Hasil Penawaran Umum_31341715_lamp2.pdf

Other Text extracted BALI

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 95

Page 1

          
Page 2

          
Page 3
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

         TANGGAL                     NOMOR
       PENGELUARAN               REKENING BANK
          DI BANK  REKENING BANK      YANG                                                             NILAI MUTASI                     NILAI YANG DIBAYARKAN
 NO.    STATEMENT YANG DIGUNAKAN   DIGUNAKAN                NAMA VENDOR DAN KETERANGAN                    BANK             DPP            PPN            PPh        NET DIBAYARKAN
                                                        YANTJE TAMAWIWY, Biaya Activation For
  1       19-Dec-22       SINARMAS         00002999994 New Services Corporate Delivery                     4,250,610       4,359,600            -        108,990          4,250,610
                                                        BANGUN KELOLA SWADAYA, PT, Tagihan
                                                        Pelunasan 70% Penarikan Kabel FTTH
  2       20-Dec-22        MANDIRI        1220011559559 cluster 10 Site                                 9,359,988,977   8,638,660,800   950,252,688   228,924,511     9,359,988,977
                                                        DIRGA BAHARI PERKASA, PT, Pengadaan
                                                        CCTV DS-2CD3027G0E-LUF Hikvision
                                                        sebanyak 215 Unit dan CCTV DS-
  3       22-Dec-22        MANDIRI        1220011559559 2CD3063G0-I Hikvision sebanyak 6 Unit            147,359,228     132,756,061     14,603,167           -         147,359,228
                                                        DIRGA BAHARI PERKASA, PT, Pengadaan
                                                        CCTV DS-2CD3027G0E-LUF Hikvision
                                                        sebanyak 215 Unit dan CCTV DS-
  4       22-Dec-22        MANDIRI        1220011559559 2CD3063G0-I Hikvision sebanyak 6 Unit            284,085,461     255,932,848     28,152,613           -         284,085,461
                                                        CORPORATE BUILDING & IN HOUSE
                                                        PROJECT, Pengajuan Biaya Supervisi
                                                        Pekerjaan Penarikan Kabel Tenant PT.
                                                        CHAMP RESTO INDONESIA (MONSIEUR
  5       22-Dec-22        MANDIRI        1220011559559 SPOON MALL TAMA                                      636,300         636,300            -             -            636,300
                                                        BANGUN KELOLA SWADAYA, PT, Tagihan
                                                        DP 30% Pekerjaan Penarikan Kabel FTTH
  6       23-Dec-22        MANDIRI        1220011559559 10.000 HP                                       9,653,985,000   8,910,000,000   980,100,000   236,115,000     9,653,985,000
                                                        MONETI INDO TEKNO, PT, Pembelian
                                                        Philips LED Trunk Linea Trunkable Linea T5
  7       23-Dec-22        MANDIRI        1220011559559 13 Watt - Warna Putih Sebanyak 11 Pcs              1,758,240       1,584,000       174,240            -           1,758,240
                                                        MONETI INDO TEKNO, PT, Pembelian OTB
                                                        Indoor 24 Core 1U PAZ Include Pigtail
  8       23-Dec-22        MANDIRI        1220011559559 SC/UPC Dia 2mm Sebanyak 10 Unit                    8,769,000       7,900,000       869,000            -           8,769,000
                                                        MONETI INDO TEKNO, PT, Pembelian OTB
                                                        Indoor 24 Core 1U PAZ Include Pigtail
  9       23-Dec-22        MANDIRI        1220011559559 SC/UPC Dia 2mm Sebanyak 10 Unit                    7,972,797       7,182,700       790,097            -           7,972,797
                                                        MONETI INDO TEKNO, PT, Pembelian POE
                                                        Injector 12V to 48V Sebanyak 40 Pcs, Kabel
  10      23-Dec-22        MANDIRI        1220011559559 Ties 30cm Black Sebanyak 1.500 Pcs                 6,893,100       6,210,000       683,100            -           6,893,100
                                                        NOKIA SOLUTIONS and NETWORK
                                                        INDONESIA, PT, Pelunasan 90% atas
                                                        Pengadaan Switch 7210SAS-D MPLS 1GE
                                                        SYS-6F4T-ETR DC48V Nokia sebanyak 30
  11      26-Dec-22       SINARMAS          0000240408 Unit                                              255,955,788     230,590,800     25,364,988           -         255,955,788
                                                        NOKIA SOLUTIONS and NETWORK
                                                        INDONESIA, PT, Pengadaan Switch 100GE
                                                        MPLS Nokia 7210 Sas-Sx PS DC48V
  12      26-Dec-22       SINARMAS          0000240408 sebanyak 19 unit                                   30,783,196      27,732,610      3,050,586           -          30,783,196
                                                        PLN PERSERO, PT, Biaya Penyambungan
                                                        Daya PLN Site Pulo Gebang RW08 - FTTH
  13      28-Dec-22          BCA            3193058058 Project                                             8,474,800       8,474,800            -             -           8,474,800
                                                        CIPTA KARYA TECHNOLOGY, PT, Tagihan
                                                        100% atas Pekerjaan Instalasi Kabel Rumah
  14      03-Jan-23        MANDIRI        1220011559559 Batch 17 untuk 60 Sales Order                     14,952,300      13,800,000      1,518,000      365,700         14,952,300
                                                        CIPTA KARYA TECHNOLOGY, PT, Tagihan
                                                        100% atas Pekerjaan Instalasi Kabel Rumah
  15      03-Jan-23        MANDIRI        1220011559559 Batch 17 untuk 60 Sales Order                     14,952,300      13,800,000      1,518,000      365,700         14,952,300
                                                        CIPTA KARYA TECHNOLOGY, PT, Tagihan
                                                        100% atas Pekerjaan Instalasi Kabel Rumah
  16      03-Jan-23        MANDIRI        1220011559559 Batch 17 untuk 60 Sales Order                     14,952,300      13,800,000      1,518,000      365,700         14,952,300
                                                        MONETI INDO TEKNO, PT, Pembelian SFP
                                                        Copper 1GB 10 KM FCLF8522P2BTL Finisar
  17      03-Jan-23        MANDIRI        1220011559559 Sebanyak 10 Pcs                                    1,443,000       1,300,000       143,000            -           1,443,000
                                                        MONETI INDO TEKNO, PT, Pembelian SFP
                                                        Copper 1GB 10 KM FCLF8522P2BTL Finisar
  18      03-Jan-23        MANDIRI        1220011559559 Sebanyak 10 Pcs                                      932,400         840,000        92,400            -            932,400
                                                        MONETI INDO TEKNO, PT, Pembelian SFP
                                                        Copper 1GB 10 KM FCLF8522P2BTL Finisar
  19      03-Jan-23        MANDIRI        1220011559559 Sebanyak 10 Pcs                                    3,607,500       3,250,000       357,500            -           3,607,500

                                                        MONETI INDO TEKNO, PT, Pembelian POE
                                                        Spliter Male to Female 2 IN +1 Sebanyak 40
  20      03-Jan-23        MANDIRI        1220011559559 Pcs, Power Supply 12v 5A Sebanyak 20 Unit         31,468,500      28,350,000      3,118,500           -          31,468,500

                                                        MONETI INDO TEKNO, PT, Pembelian POE
                                                        Spliter Male to Female 2 IN +1 Sebanyak 40
  21      03-Jan-23        MANDIRI        1220011559559 Pcs, Power Supply 12v 5A Sebanyak 20 Unit          4,866,240       4,384,000       482,240            -           4,866,240
                                                        BERGAS PAMUNGKAS, Tagihan 100% atas
                                                        Pekerjaan Perbaikan Tiang Miring di
                                                        Cipinang Muara RW03 site MP Cipinang
  22      03-Jan-23        MANDIRI        1220011559559 Besar Selatan-002                                  1,409,994       1,446,147            -         36,153          1,409,994

                                                        BERGAS PAMUNGKAS, Tagihan 100% atas
                                                        Pekerjaan Perbaikan Tiang Miring Jl. Srikaya
  23      03-Jan-23        MANDIRI        1220011559559 5 RW09 Harapan Baru site Kranji-001                1,871,754       1,919,747            -         47,993          1,871,754
                                                        BERGAS PAMUNGKAS, Tagihan 100% atas
                                                        Pekerjaan Pemindahan Tiang Karet Tengsin
  24      03-Jan-23        MANDIRI        1220011559559 RW05 kantor Penjernihan                            2,298,804       2,357,747            -         58,943          2,298,804
                                                        BERGAS PAMUNGKAS, Tagihan 100% atas
                                                        Pekerjaan Perbaikan Tiang Rubuh site
                                                        Apartement Pluit Sea View site MP Ancol-
  25      03-Jan-23        MANDIRI        1220011559559 001                                                1,815,594       1,862,147            -         46,553          1,815,594
                                                        BERGAS PAMUNGKAS, Tagihan 100% atas
                                                        Pekerjaan Pemindahan FAT Pedestal FAT-
                                                        02-032 PBU RW09 site MCP Kembangan
  26      03-Jan-23        MANDIRI        1220011559559 Utara-015                                          1,907,049       1,955,947            -         48,898          1,907,049
Page 4
        TANGGAL                     NOMOR
      PENGELUARAN               REKENING BANK
         DI BANK  REKENING BANK      YANG                                                 NILAI MUTASI                  NILAI YANG DIBAYARKAN
NO.    STATEMENT YANG DIGUNAKAN   DIGUNAKAN        NAMA VENDOR DAN KETERANGAN                BANK          DPP            PPN            PPh       NET DIBAYARKAN
                                               BERGAS PAMUNGKAS, Tagihan 100% atas
                                               Pekerjaan Jumper Kabel Feeder New
27      03-Jan-23    MANDIRI     1220011559559 Cluster MCP Cilangkap-010                      2,723,514     2,793,347           -         69,833         2,723,514
                                               BERGAS PAMUNGKAS, Tagihan 100% atas
                                               Pekerjaan Pemindahan FAT Pedestal FAT-
                                               01-004 Cluster Meruya Residence site MP
28      03-Jan-23    MANDIRI     1220011559559 Meruya Selatan-001                             2,245,374     2,302,947           -         57,573         2,245,374
                                               FTTX OPERATION, Uang Muka Beban
                                               Umum atas Biaya Relokasi Kabel Fiber
29      04-Jan-23    MANDIRI     1220011559559 Optik Apartemen Hampton's Park - Trf           5,463,500     5,463,500           -            -           5,463,500
                                               BERGAS PAMUNGKAS, Tagihan 100% atas
                                               Pekerjaan Perbaikan Microsubduct Landai
                                               PBU RW11 Complain dari pengelola site
30      05-Jan-23    MANDIRI     1220011559559 MCP Kembangan Utara-022                        4,268,178     4,377,618           -        109,440         4,268,178
                                               BIBIT, Mr, Biaya Paket Pekerjaan
                                               Penambahan 2 titik CCTV Diskominfo
                                               Kabupaten Gianyar dan Pekerjaan FO Link
31      06-Jan-23    SINARMAS     0002999994 New Customer PT. Dimensi Media Solusi            4,165,956     4,294,800           -        128,844         4,165,956
                                               MDT TOTAL SOLUTION, PT, Biaya
                                               Pembelian Joint Closure 96 Core NWC,
                                               Protection Sleeve dan Pigtail SM SC/UPC
32      09-Jan-23    MANDIRI     1220011559559 (PO Rp.18.159.600,- PPN Rp.1.799.600,- )      18,159,600    16,360,000     1,799,600          -          18,159,600
                                               TELCO ABADI JAYA, CV, Pembelian Joint
                                               Closure 24 Core Full Set Spare Stok
                                               Werehouse Bali Sebanyak 10 Unit, Joint
                                               Closure 24 Core NWC Full Set Sebanyak 4
33      09-Jan-23    MANDIRI     1220011559559 Unit                                             338,328      304,800        33,528           -            338,328
                                               TELCO ABADI JAYA, CV, Pembelian Joint
                                               Closure 24 Core Full Set Spare Stok
                                               Werehouse Bali Sebanyak 10 Unit, Joint
                                               Closure 24 Core NWC Full Set Sebanyak 4
34      09-Jan-23    MANDIRI     1220011559559 Unit                                           7,609,050     6,855,000      754,050           -           7,609,050
                                               TELCO ABADI JAYA, CV, Pembelian Joint
                                               Closure 24 Core Full Set Spare Stok
                                               Werehouse Bali Sebanyak 10 Unit, Joint
                                               Closure 24 Core NWC Full Set Sebanyak 4
35      09-Jan-23    MANDIRI     1220011559559 Unit                                           3,651,345     3,289,500      361,845           -           3,651,345
                                               TELCO ABADI JAYA, CV, Pembelian Joint
                                               Closure 24 Core Full Set Spare Stok
                                               Werehouse Bali Sebanyak 10 Unit, Joint
                                               Closure 24 Core NWC Full Set Sebanyak 4
36      09-Jan-23    MANDIRI     1220011559559 Unit                                          11,555,100    10,410,000     1,145,100          -          11,555,100
                                               TELCO ABADI JAYA, CV, Pembelian Joint
                                               Closure 24 Core Full Set Spare Stok
                                               Werehouse Bali Sebanyak 10 Unit, Joint
                                               Closure 24 Core NWC Full Set Sebanyak 4
37      09-Jan-23    MANDIRI     1220011559559 Unit                                           1,914,750     1,725,000      189,750           -           1,914,750
                                               TELCO ABADI JAYA, CV, Pembelian Joint
                                               Closure 24 Core Full Set Spare Stok
                                               Werehouse Bali Sebanyak 10 Unit, Joint
                                               Closure 24 Core NWC Full Set Sebanyak 4
38      09-Jan-23    MANDIRI     1220011559559 Unit                                          15,850,800    14,280,000     1,570,800          -          15,850,800
                                               ALPHA CIPTA COMPUTINDO, PT, Pembelian
                                               Mikrotik Router CCR1036-8G-2S+ Sebanyak
39      09-Jan-23    MANDIRI     1220011559559 2 Unit                                        37,629,000    33,900,000     3,729,000          -          37,629,000
                                               ALPHA CIPTA COMPUTINDO, PT,
                                               Pembelian Bracket Dead End Noise D 70-
40      09-Jan-23    MANDIRI     1220011559559 95MM 96 Core 30 Unit,                         18,370,500    16,550,000     1,820,500          -          18,370,500
                                               ASIA TELCO NETWORKS, PT, Pembelian
                                               Connector SC/APC Fast Connector untuk
41      09-Jan-23    MANDIRI     1220011559559 Kebutuhan IKR Sebanyak 15.984                 15,318,000    13,800,000     1,518,000          -          15,318,000
                                               ASIA TELCO NETWORKS, PT, Pembelian
                                               Connector SC/APC Fast Connector untuk
42      09-Jan-23    MANDIRI     1220011559559 Kebutuhan IKR Sebanyak 15.984                 37,430,088    33,720,800     3,709,288          -          37,430,088
                                               ASIA TELCO NETWORKS, PT, Pembelian
                                               Connector SC/APC Fast Connector untuk
43      09-Jan-23    MANDIRI     1220011559559 Kebutuhan IKR Sebanyak 15.984                157,693,029   142,065,792    15,627,237          -         157,693,029

                                               DIAN MUSTIKA AGUNG, PT, Pembelian
                                               Smart Mini OTDR AUA900D VFL OPM Fiber
44      09-Jan-23    MANDIRI     1220011559559 Optic Tester COMPTYCO Sebanyak 4 Unit         23,976,000    21,600,000     2,376,000          -          23,976,000

                                               DIAN MUSTIKA AGUNG, PT, Pembelian
                                               Smart Mini OTDR AUA900D VFL OPM Fiber
45      09-Jan-23    MANDIRI     1220011559559 Optic Tester COMPTYCO Sebanyak 4 Unit          5,521,140     4,974,000      547,140           -           5,521,140
                                               KALIABANG JAYA PRATAMA, PT, Tagihan
                                               Retensi 10% atas Pekerjaan Penarikan
                                               Kabel Tanam Final di PT Lancar Laju
46      09-Jan-23    MANDIRI     1220011559559 Membangun                                      1,344,699     1,241,070      136,517        32,888         1,344,699
                                               KALIABANG JAYA PRATAMA, PT, Tagihan
                                               Retensi 10% atas Pekerjaan Penarikan
                                               Kabel Tanam Final di PT Lancar Laju
47      09-Jan-23    MANDIRI     1220011559559 Membangun                                      1,032,142      952,600       104,786        25,244         1,032,142
                                               KALIABANG JAYA PRATAMA, PT, Tagihan
                                               Retensi 10% atas Pekerjaan Penarikan
                                               Kabel Tanam Final di PT Lancar Laju
48      09-Jan-23    MANDIRI     1220011559559 Membangun                                        598,154      552,058        60,726        14,630          598,154
                                               SEMBILAN BELAS MULTI USAHA, PT,
                                               Tagihan Retensi 10% atas Pekerjaan
49      09-Jan-23    MANDIRI     1220011559559 Penarikan Kabel Udara Final                      796,047      734,700        80,817        19,470          796,047
                                               SEMBILAN BELAS MULTI USAHA, PT,
                                               Tagihan Retensi 10% atas Pekerjaan
                                               Penarikan Kabel Udara Final di Taman
50      09-Jan-23    MANDIRI     1220011559559 Anggrek Superhero                                967,199      892,662        98,193        23,656          967,199
Page 5
        TANGGAL                     NOMOR
      PENGELUARAN               REKENING BANK
         DI BANK  REKENING BANK      YANG                                                        NILAI MUTASI                     NILAI YANG DIBAYARKAN
NO.    STATEMENT YANG DIGUNAKAN   DIGUNAKAN          NAMA VENDOR DAN KETERANGAN                     BANK             DPP            PPN            PPh       NET DIBAYARKAN
                                                 SEMBILAN BELAS MULTI USAHA, PT,
                                                 Tagihan Retensi 10% atas Pekerjaan
51      09-Jan-23     MANDIRI      1220011559559 Penarikan Kabel Udara Final                         1,202,102       1,109,462       122,041        29,401         1,202,102
                                                 SEMBILAN BELAS MULTI USAHA, PT,
                                                 Tagihan Retensi 10% atas Pekerjaan
52      09-Jan-23     MANDIRI      1220011559559 Penarikan Kabel Udara Final                           995,173         918,480       101,033        24,340          995,173
                                                 SEMBILAN BELAS MULTI USAHA, PT,
                                                 Tagihan Retensi 10% atas Pekerjaan
53      09-Jan-23     MANDIRI      1220011559559 Penarikan Kabel Udara Final                         1,077,562         994,520       109,397        26,355         1,077,562
                                                 SEMBILAN BELAS MULTI USAHA, PT,
                                                 Tagihan Retensi 10% atas Pekerjaan
54      09-Jan-23     MANDIRI      1220011559559 Penarikan Kabel Udara Final                           931,811         860,000        94,601        22,790          931,811
                                                 SEMBILAN BELAS MULTI USAHA, PT,
                                                 Tagihan Retensi 10% atas Pekerjaan
55      09-Jan-23     MANDIRI      1220011559559 Penarikan Kabel Udara Final                         1,456,531       1,344,284       147,871        35,624         1,456,531
                                                 TELCO ABADI JAYA, CV, Pembelian C-Clamp
                                                 6MM Fort Pengadaan Material Aksesoris
                                                 IKR Q4 2022 untuk 13.500 Home Connect
56      09-Jan-23     MANDIRI      1220011559559 Sebanyak 96.800 Pcs                                 1,414,140       1,274,000       140,140           -           1,414,140
                                                 TELCO ABADI JAYA, CV, Pembelian C-Clamp
                                                 6MM Fort Pengadaan Material Aksesoris
                                                 IKR Q4 2022 untuk 13.500 Home Connect
57      09-Jan-23     MANDIRI      1220011559559 Sebanyak 96.800 Pcs                                 1,332,000       1,200,000       132,000           -           1,332,000
                                                 TELCO ABADI JAYA, CV, Pembelian C-Clamp
                                                 6MM Fort Pengadaan Material Aksesoris
                                                 IKR Q4 2022 untuk 13.500 Home Connect
58      09-Jan-23     MANDIRI      1220011559559 Sebanyak 96.800 Pcs                                   355,200         320,000        35,200           -            355,200
                                                 TELCO ABADI JAYA, CV, Pembelian C-Clamp
                                                 6MM Fort Pengadaan Material Aksesoris
                                                 IKR Q4 2022 untuk 13.500 Home Connect
59      09-Jan-23     MANDIRI      1220011559559 Sebanyak 96.800 Pcs                                   399,600         360,000        39,600           -            399,600
                                                 TELCO ABADI JAYA, CV, Pembelian C-Clamp
                                                 6MM Fort Pengadaan Material Aksesoris
                                                 IKR Q4 2022 untuk 13.500 Home Connect
60      09-Jan-23     MANDIRI      1220011559559 Sebanyak 96.800 Pcs                                 6,446,880       5,808,000       638,880           -           6,446,880
                                                 MDT TOTAL SOLUTION, PT, Pembelian SFP
                                                 SM 1G 20KM 2 Unit, SFP SM 10G 40KM 1
61      09-Jan-23     MANDIRI      1220011559559 Unit, SFP SM 10G 20KM 2 Unit                        2,775,000       2,500,000       275,000           -           2,775,000
                                                 MDT TOTAL SOLUTION, PT, Pembelian SFP
                                                 SM 1G 20KM 2 Unit, SFP SM 10G 40KM 1
62      09-Jan-23     MANDIRI      1220011559559 Unit, SFP SM 10G 20KM 2 Unit                        4,329,000       3,900,000       429,000           -           4,329,000
                                                 KALIABANG JAYA PRATAMA, PT, Tagihan
                                                 100% atas Pekerjaan Swap Box Panel &
                                                 Mikrotik Jakwifi 10 Site : Kebayoran Lama
                                                 Selatan RW06,Pesanggrahan RW01,Cipete
                                                 Selatan RW06,Cipete Utara
                                                 RW10,RW06,Pisangan Timur
                                                 RW15,Pisangan Timur RW14Pd.Kopi
63      09-Jan-23     MANDIRI      1220011559559 RW1,R.BadakSelatanRW10,Koja RW6                    12,063,689      11,134,000      1,224,740      295,051        12,063,689
                                                 KALIABANG JAYA PRATAMA, PT, Tagihan
                                                 100% atas Pekerjaan Swap Box Panel &
                                                 Mikrotik Jakwifi 10 Site : Kebayoran Lama
                                                 Selatan RW04,Kalibata RW05,Cipete Utara
                                                 RW04,Batu Ampar RW06,Cakung Timur
                                                 RW05,RW07,Klender RW03,Rawa Terate
                                                 RW05,Cipinang Besar
64      09-Jan-23     MANDIRI      1220011559559 SelatanRW09,K.Bawang RW2                           17,778,068      16,408,000      1,804,880      434,812        17,778,068
                                                 NOKIA SOLUTIONS and NETWORK
                                                 INDONESIA, PT, Pelunasan 90% atas
                                                 Pengadaan Wifi Beacon Dual Band AC1200
                                                 2XGE EUPLUG HA-020W-B Nokia sebanyak
                                                 4.500unit (Pelunasan oleh SKBDN
65      10-Jan-23    SINARMAS       0000240408 0622/001/0876/L)                                   2,776,654,566   2,501,490,600   275,163,966          -       2,776,654,566

                                                 DIRGA BAHARI PERKASA, PT, DP 30% atas
                                                 Pengadaan CCTV DS-2CT4T43G2-IS
                                                 Hikvision sebanyak 200 unit dan DS-
66      11-Jan-23     MANDIRI      1220011559559 2CT4051G0-I Hikvision sebanyak 2.000 Unit          83,601,652              -      83,601,652          -          83,601,652

                                                 DIRGA BAHARI PERKASA, PT, DP 30% atas
                                                 Pengadaan CCTV DS-2CT4T43G2-IS
                                                 Hikvision sebanyak 200 unit dan DS-
67      11-Jan-23     MANDIRI      1220011559559 2CT4051G0-I Hikvision sebanyak 2.000 Unit         760,015,020     760,015,020            -            -         760,015,020
                                                 BANGUN KELOLA SWADAYA, PT, Tagihan
                                                 Penarikan Kabel FTTH cluster Dukuh
                                                 Kupang RW07 (237HP), Putat Jaya RW08
                                                 (406HP), Lebak Bulus RW 08 (114HP),
                                                 Kampung Malang Tengah RW05 (283),
                                                 Ciracas RW010 (252HP), Ciracas RW04
68      17-Jan-23     MANDIRI      1220011559559 (308HP) dan Limo RW07 (258HP)                     500,000,000     461,467,467     50,761,421   12,228,888       500,000,000

                                                 ST ENGINEERING ADVANCED NETWORKS &
                                                 SENSORS PTE LTD, DP 30% atas Pengadaan
                                                 Cable Optical Drop 1 Core With Messenger
                                                 80M sebanyak 2532 Unit, 120M sebanyak
69      19-Jan-23   SINARMAS CNY    0037837897 2734Pcs dan sebanyak 755550Mtr                      895,548,915     895,548,915            -            -         895,548,915
                                                 PRYSMIAN CABLES INDONESIA, PT, Uang
                                                 Muka Beban Umum atas Pengajuan Giro
                                                 mundur 180 hari untuk pembelian Kabel
70      23-Jan-23     MANDIRI      1220011559559 Prysmian PO : 1010031689 - Trf                    365,079,000     328,900,000     36,179,000          -         365,079,000
                                                 DANANG DWI YUNAWANTO, Pekerjaan
                                                 Activation For New Services Corporate
                                                 Delivery PT. Propertindo Indah Lestari (Villa
71      24-Jan-23    SINARMAS       0002999994 Kaba-Kaba Resort)                                     2,535,192       2,613,600            -         78,408         2,535,192
Page 6
        TANGGAL                     NOMOR
      PENGELUARAN               REKENING BANK
         DI BANK  REKENING BANK      YANG                                                   NILAI MUTASI                     NILAI YANG DIBAYARKAN
NO.    STATEMENT YANG DIGUNAKAN   DIGUNAKAN        NAMA VENDOR DAN KETERANGAN                  BANK             DPP            PPN            PPh       NET DIBAYARKAN
                                               BANGUN KELOLA SWADAYA, PT, Tagihan
                                               Penarikan Kabel FTTH cluster Dukuh
                                               Kupang RW07 (237HP), Putat Jaya RW08
                                               (406HP), Lebak Bulus RW 08 (114HP),
                                               Kampung Malang Tengah RW05 (283),
                                               Ciracas RW010 (252HP), Ciracas RW04
72      25-Jan-23    MANDIRI     1220011559559 (308HP) dan Limo RW07 (258HP)                 3,406,302,677   3,143,795,733   345,817,531   83,310,587     3,406,302,677
                                               INDOKARYA SUKSES BERSAMA, PT, Biaya
                                               Supervisi Batch 5 sebanyak 33 SO di
73      25-Jan-23    MANDIRI     1220011559559 Apartement East Casablanca                       9,074,984      10,083,316            -      1,008,332         9,074,984
                                               CIPTA SEDAYU ELEKTRINDO, PT, Tagihan
                                               100% atas Paket Pekerjaan Pengadaan
                                               Sertifikat Laik Operasi (SLO) 55 Site Kota
74      25-Jan-23    MANDIRI     1220011559559 Bandung                                         13,114,063      12,031,250      1,323,438      240,625        13,114,063
                                               BIBIT, Mr, Biaya Pekerjaan Penarikan Kabel
                                               UTP Link Akses to 818059 Pengadilan
75      26-Jan-23    SINARMAS      0002999994 Negeri kab.Buleleng                               1,664,520       1,716,000            -         51,480         1,664,520
                                               YANTJE TAMAWIWY, Biaya Pekerjaan
                                               Penarikan Kabel UTP Link Akses to 818067
76      26-Jan-23    SINARMAS      0002999994 PT.Vilo Kreasi Rasa (Vilo Gelato) di DSM            911,040         934,400            -         23,360          911,040
                                               NOKIA SOLUTIONS and NETWORK
                                               INDONESIA, PT, Pelunasan 90% atas
                                               Pengadaan ONT GPON 1GE SC/APC Batch 1
                                               Project FTTX IKR sebanyak 4500Pcs
77      30-Jan-23    SINARMAS      0000240408 (Pelunasan oleh SKBDN 0622/001/0875/L          1,527,157,314   1,375,817,400   151,339,914          -       1,527,157,314
                                               ASIA TELCO NETWORKS, PT, Pembelian
                                               Connector SC/APC Fast Connector
78      31-Jan-23    MANDIRI     1220011559559 Sebanyak 13.803 Pcs                            136,175,981     122,681,064     13,494,917          -         136,175,981
                                               INFRA YES SOLUSINDO, PT, Jasa Penarikan
                                               dan Supervisi 12 SO Batch 27 di
79      31-Jan-23    MANDIRI     1220011559559 Apartement Green Pramuka                         4,116,000       4,200,000            -         84,000         4,116,000
                                               INFRA YES SOLUSINDO, PT, Jasa Penarikan
                                               dan Supervisi 12 SO Batch 27 di
80      31-Jan-23    MANDIRI     1220011559559 Apartement Green Pramuka                         4,116,000       4,200,000            -         84,000         4,116,000
                                               INFRA YES SOLUSINDO, PT, Jasa Penarikan
                                               dan Supervisi 12 SO Batch 27 di
81      31-Jan-23    MANDIRI     1220011559559 Apartement Green Pramuka                         4,116,000       4,200,000            -         84,000         4,116,000
                                               PRIMACOM INTERBUANA, PT, Biaya
                                               Instalasi Sewa Local Loop 25 Mbps
                                               Diskominfo Kota Bandung CCTV sebanyak
82      31-Jan-23    MANDIRI     1220011559559 54 Titik                                       147,150,000     135,000,000     14,850,000    2,700,000       147,150,000
                                               SUMADI, Pekerjaan Activation For New
                                               Services Corporate Delivery PT. Prasetia
83     02-Feb-23     SINARMAS     00002999994 Dwi Dharma                                        3,363,339       3,467,360            -        104,021         3,363,339
                                               BERCA HARDAYAPERKASA, PT, Pembelian
                                               Connector RJ-45 Cat 6 200 Pcs, Cable
                                               Optical Drop SM 4Core With Mesenger
84     02-Feb-23     MANDIRI     1220011559559 1.000 M 6.000 Mtr                               13,071,804      11,776,400      1,295,404          -          13,071,804
                                               BERCA HARDAYAPERKASA, PT, Pembelian
                                               Connector RJ-45 Cat 6 200 Pcs, Cable
                                               Optical Drop SM 4Core With Mesenger
85     02-Feb-23     MANDIRI     1220011559559 1.000 M 6.000 Mtr                                1,426,905       1,285,500       141,405           -           1,426,905
                                               DANANG DWI YUNAWANTO, Pekerjaan
                                               Activation For New Services Corporate
                                               Delivery PT. Idreamland Management
86     02-Feb-23     SINARMAS     00002999994 Dunia (The Rich Prada Bali)                       2,501,436       2,578,800            -         77,364         2,501,436
                                               SANTA MULTI SEMESTA, PT, Tagihan 100%
                                               atas Pekerjaan Relokasi Tiang Jakwifi
                                               Diskominfo AP RW08 Kedaung Kaliangke,
87     03-Feb-23     MANDIRI     1220011559559 Cengkareng, Jakbar                               2,773,716       2,592,258       285,148       103,690         2,773,716
                                               SANTA MULTI SEMESTA, PT, Tagihan 100%
                                               atas Pekerjaan FO Cut dan Restorasi
                                               Permanent Impact Pembuatan Saluran Air
88     03-Feb-23     MANDIRI     1220011559559 Dinas SDA Site MMR Batu Ceper                    2,235,962       2,089,684       229,865        83,587         2,235,962
                                               SANTA MULTI SEMESTA, PT, Tagihan 100%
                                               atas Pekerjaan Relokasi Tiang Jakwifi
                                               Diskominfo AP RW03 Rawa Badak Utara,
89     03-Feb-23     MANDIRI     1220011559559 Koja, Jakut Batch-II                             3,126,282       2,921,759       321,393       116,870         3,126,282
                                               FURUKAWA OPTICAL SOLUTIONS
                                               INDONESIA, PT, Tagihan 100% atas
                                               Pengadaan Optical Drop Cable 1 Core with
                                               Messanger untuk kebutuhan IKR sebanyak
90     03-Feb-23     MANDIRI     1220011559559 156.000 Mtr                                    363,636,000     327,600,000     36,036,000          -         363,636,000

                                               PURIAMPERA INTIPRATAMA, PT, Biaya
                                               Supervisi Pekerjaan Penarikan Kabel Tenant
91     03-Feb-23     MANDIRI     1220011559559 PT Sonar Analitika Indonesia di AD Premier         505,000         500,000        55,000        50,000          505,000
                                               BERGAS PAMUNGKAS, Tagihan 100% atas
                                               Pekerjaan Pemindahan Tiang Cipinang
                                               Muara Impact Pembangunan SDA site
92     03-Feb-23     MANDIRI     1220011559559 Cipinang Besar Selatan-006                       1,813,254       1,859,747            -         46,493         1,813,254
                                               BERGAS PAMUNGKAS, Tagihan 100% atas
                                               Pekerjaan Pemindahan Tiang Cipinang
                                               Muara Impact Pembangunan SDA site
93     03-Feb-23     MANDIRI     1220011559559 Cipinang Besar Selatan-006                       2,492,634       2,556,547            -         63,913         2,492,634
                                               BERGAS PAMUNGKAS, Tagihan 100% atas
                                               Pekerjaan Pemindahan Tiang Cipinang
                                               Muara Impact Pembangunan SDA site
94     03-Feb-23     MANDIRI     1220011559559 Cipinang Besar Selatan-006                       1,499,694       1,538,147            -         38,453         1,499,694
                                               NOKIA SOLUTIONS and NETWORK
                                               INDONESIA, PT, Pengadaan Switch 100GE
                                               MPLS SYS-64SFP+4QSFP28 7210 Sas-Sx
                                               Nokia sebanyak 17 unit (Pelunasan oleh
95     06-Feb-23     SINARMAS     0000240408 SKBDN 0422/001/0864/L)                           599,177,940     539,799,946     59,377,994          -         599,177,940
Page 7
        TANGGAL                     NOMOR
      PENGELUARAN               REKENING BANK
         DI BANK  REKENING BANK      YANG                                                    NILAI MUTASI                   NILAI YANG DIBAYARKAN
NO.    STATEMENT YANG DIGUNAKAN   DIGUNAKAN       NAMA VENDOR DAN KETERANGAN                    BANK           DPP            PPN            PPh       NET DIBAYARKAN
                                               BANGUN KELOLA SWADAYA, PT, Tagihan
                                               100% Pekerjaan Penarikan Kabel FTTH
96     07-Feb-23     MANDIRI     1220011559559 untuk 10 Site                                   600,000,000    553,760,960    60,913,706   14,674,665       600,000,000
                                               BANGUN KELOLA SWADAYA, PT, Tagihan
                                               100% Pekerjaan Penarikan Kabel FTTH
97     07-Feb-23     MANDIRI     1220011559559 untuk 10 Site                                  1,000,000,000   922,934,933   101,522,843   24,457,776     1,000,000,000

                                               FIBER TEKNOLOGI INOVASI, PT, Biaya
                                               Pembelian material Dropcore 1 core 1000m
                                               steel wire fiber tekno untuk troubleshoot
98     07-Feb-23     MANDIRI     1220011559559 Team FTTX (Inv: 075/FT-INV/XI/22)                   821,400       740,000        81,400           -            821,400
                                               NOKIA SOLUTIONS and NETWORK
                                               INDONESIA, PT, DP 10% atas Pengadaan
                                               Wifi Nokia Beacon 2 1 Pack 2XGE UNI EU
99     07-Feb-23     MANDIRI     1220011559559 Plug sebanyak 2.000 Unit                         17,311,338            -      17,311,338          -          17,311,338
                                               NOKIA SOLUTIONS and NETWORK
                                               INDONESIA, PT, DP 10% atas Pengadaan
                                               Wifi Nokia Beacon 2 1 Pack 2XGE UNI EU
100    07-Feb-23     MANDIRI     1220011559559 Plug sebanyak 2.000 Unit                        157,375,800    157,375,800           -            -         157,375,800
                                               DJAJA LISTRIK, PT, Pembelian Mechanical
101    08-Feb-23     MANDIRI     1220011559559 Tools Kit 78 Pcs Untuk Team FTTX                  3,996,000      3,600,000      396,000           -           3,996,000
                                               MONETI INDO TEKNO, PT, Pembelian
                                               Rossette 4 Core SC/UPC With Adaptor With
102    08-Feb-23     MANDIRI     1220011559559 Pigtail Sebanyak 10 Unit                            721,500       650,000        71,500           -            721,500
                                               MONETI INDO TEKNO, PT, Pembelian Aalat
                                               Ukur OTDR Jointwit JW 3302 S 3 Unit,
                                               Bracket Dead end Noise D 25-50 MM 24
103    08-Feb-23     MANDIRI     1220011559559 Core 30 Unit                                        574,425       517,500        56,925           -            574,425
                                               MONETI INDO TEKNO, PT, Pembelian Aalat
                                               Ukur OTDR Jointwit JW 3302 S 3 Unit,
                                               Bracket Dead end Noise D 25-50 MM 24
104    08-Feb-23     MANDIRI     1220011559559 Core 30 Unit                                     46,242,600     41,660,000     4,582,600          -          46,242,600
                                               MONETI INDO TEKNO, PT, Pembelian Aalat
                                               Ukur OTDR Jointwit JW 3302 S 3 Unit,
                                               Bracket Dead end Noise D 25-50 MM 24
105    08-Feb-23     MANDIRI     1220011559559 Core 30 Unit                                     31,863,660     28,706,000     3,157,660          -          31,863,660
                                               PANCA PUTRA SOLUSINDO, PT, Pembelian
                                               HDD Surveillance 8 TB untuk Kebutuhan
106    08-Feb-23     MANDIRI     1220011559559 Project CCTV Bandung Sebanyak 6 Unit             20,646,000     18,600,000     2,046,000          -          20,646,000
                                               YANTJE TAMAWIWY, Biaya pekerjaan
                                               Activation For New Services Corporate
                                               Delivery CV. Galeria Maju Abadi (Dr. Specs)
107    09-Feb-23     SINARMAS     00002999994 di Mall Bali Galeria                                 746,970       766,123            -        19,153           746,970
                                               BANGUN KELOLA SWADAYA, PT, Tagihan
                                               100% Pekerjaan Penarikan Kabel FTTH
108    09-Feb-23     MANDIRI     1220011559559 untuk 10 Site                                   350,008,073    323,034,677    35,533,815    8,560,419       350,008,073
                                               DIAN MUSTIKA AGUNG, PT, Pembelian
                                               Cleaner Optic Fiber E501 Pollykote
                                               Sebanyak 20 Pcs, Pembelian ATK Tape
                                               Label Printer TZE-231 12 MM Hitam Label
109    09-Feb-23     MANDIRI     1220011559559 Putih Sebanyak 20 Pcs                             4,773,000      4,300,000      473,000           -           4,773,000

                                               DIAN MUSTIKA AGUNG, PT, Pembelian
                                               Cable Power NYAF 10MM Red Supreme
                                               Sebanyak 1.000 MTR, Cable Power NYAF
110    09-Feb-23     MANDIRI     1220011559559 10MM Black Supreme Sebanyak 1.000 MTR            53,280,000     48,000,000     5,280,000          -          53,280,000
                                               DIAN MUSTIKA AGUNG, PT, Pembelian
                                               Cleaner Optic Fiber E501 Pollykote
                                               Sebanyak 20 Pcs, Pembelian ATK Tape
                                               Label Printer TZE-231 12 MM Hitam Label
111    09-Feb-23     MANDIRI     1220011559559 Putih Sebanyak 20 Pcs                             4,773,000      4,300,000      473,000           -           4,773,000
                                               BANGUN KELOLA SWADAYA, PT, Penarikan
                                               Kabel FTTH cluster Kedoya Utara RW06
112    13-Feb-23     MANDIRI     1220011559559 (347HP)                                        1,000,000,000   922,934,933   101,522,843   24,457,776     1,000,000,000
                                               MDT TOTAL SOLUTION, PT, Pembelian Joint
                                               Closure 96 Core 10 Unit, Joint Closure 24
                                               Core 5 Unit, Joint Closure 24 Core 5 Unit,
113    14-Feb-23     MANDIRI     1220011559559 Joint Closure 48 Core 5 Unit                     11,044,500      9,950,000     1,094,500          -          11,044,500
                                               MDT TOTAL SOLUTION, PT, Pembelian Joint
                                               Closure 96 Core 10 Unit, Joint Closure 24
                                               Core 5 Unit, Joint Closure 24 Core 5 Unit,
114    14-Feb-23     MANDIRI     1220011559559 Joint Closure 48 Core 5 Unit                      1,964,700      1,770,000      194,700           -           1,964,700
                                               MDT TOTAL SOLUTION, PT, Pembelian Joint
                                               Closure 96 Core 10 Unit, Joint Closure 24
                                               Core 5 Unit, Joint Closure 24 Core 5 Unit,
115    14-Feb-23     MANDIRI     1220011559559 Joint Closure 48 Core 5 Unit                      2,664,000      2,400,000      264,000           -           2,664,000
                                               BANGUN KELOLA SWADAYA, PT, Penarikan
                                               Kabel FTTH cluster Kedoya Utara RW06
116    14-Feb-23     MANDIRI     1220011559559 (347HP)                                        1,000,000,000   922,934,933   101,522,843   24,457,776     1,000,000,000
                                               DIRGA BAHARI PERKASA, PT, Tagihan 100%
                                               atas Pengadaan NVR 64 Channel DS-9664NI-
117    14-Feb-23     MANDIRI     1220011559559 I16 Hikvision sebanyak 2 Unit                    67,595,015     60,896,410     6,698,605          -          67,595,015
                                               ASIA TELCO NETWORKS, PT, Pembelian
                                               QSFP28 SM 100 GBASE LR4 10 km untuk
                                               Pengadaan Material Kebutuhan Program
118    14-Feb-23     MANDIRI     1220011559559 Swap Sas-SX Sebanyak 11 Unit                    142,857,000    128,700,000    14,157,000          -         142,857,000
                                               PLN PERSERO, PT, Biaya pasang baru daya
119    14-Feb-23     MANDIRI     1220011559559 PLN                                               1,421,500      1,421,500           -            -           1,421,500
                                               PLN PERSERO, PT, Biaya pasang baru daya
120    14-Feb-23     MANDIRI     1220011559559 PLN                                               1,421,500      1,421,500           -            -           1,421,500
                                               PLN PERSERO, PT, Biaya pasang baru daya
121    14-Feb-23     MANDIRI     1220011559559 PLN                                               1,421,500      1,421,500           -            -           1,421,500
                                               PLN PERSERO, PT, Biaya pasang baru daya
122    14-Feb-23     MANDIRI     1220011559559 PLN                                               1,421,500      1,421,500           -            -           1,421,500
Page 8
        TANGGAL                     NOMOR
      PENGELUARAN               REKENING BANK
         DI BANK  REKENING BANK      YANG                                                      NILAI MUTASI                     NILAI YANG DIBAYARKAN
NO.    STATEMENT YANG DIGUNAKAN   DIGUNAKAN         NAMA VENDOR DAN KETERANGAN                    BANK             DPP            PPN            PPh       NET DIBAYARKAN
                                                PLN PERSERO, PT, Biaya pasang baru daya
123    14-Feb-23     MANDIRI      1220011559559 PLN                                                1,421,500       1,421,500            -            -           1,421,500
                                                PLN PERSERO, PT, Biaya pasang baru daya
124    14-Feb-23     MANDIRI      1220011559559 PLN                                                1,421,500       1,421,500            -            -           1,421,500
                                                PLN PERSERO, PT, Biaya pasang baru daya
125    14-Feb-23     MANDIRI      1220011559559 PLN                                                1,421,500       1,421,500            -            -           1,421,500
                                                PLN PERSERO, PT, Biaya pasang baru daya
126    14-Feb-23     MANDIRI      1220011559559 PLN                                                1,421,500       1,421,500            -            -           1,421,500
                                                PLN PERSERO, PT, Biaya pasang baru daya
127    14-Feb-23     MANDIRI      1220011559559 PLN                                                1,421,500       1,421,500            -            -           1,421,500
                                                PLN PERSERO, PT, Biaya pasang baru daya
128    14-Feb-23     MANDIRI      1220011559559 PLN                                                1,421,500       1,421,500            -            -           1,421,500
                                                PLN PERSERO, PT, Biaya pasang baru daya
129    14-Feb-23     MANDIRI      1220011559559 PLN                                                1,421,500       1,421,500            -            -           1,421,500
                                                PLN PERSERO, PT, Biaya pasang baru daya
130    14-Feb-23     MANDIRI      1220011559559 PLN                                                1,421,500       1,421,500            -            -           1,421,500
                                                PLN PERSERO, PT, Biaya pasang baru daya
131    14-Feb-23     MANDIRI      1220011559559 PLN                                                1,421,500       1,421,500            -            -           1,421,500
                                                PLN PERSERO, PT, Biaya pasang baru daya
132    14-Feb-23     MANDIRI      1220011559559 PLN                                                1,421,500       1,421,500            -            -           1,421,500
                                                AURORA MULIA SAMBARU, PT, Tagihan
                                                100% atas Pekerjaan Instalasi Kabel Rumah
133    16-Feb-23     MANDIRI      1220011559559 Batch 07 untuk 95 Sales Order                     24,727,700      23,110,000      2,542,100      924,400        24,727,700
                                                AURORA MULIA SAMBARU, PT, Tagihan
                                                100% atas Pekerjaan Instalasi Kabel Rumah
134    16-Feb-23     MANDIRI      1220011559559 Batch 07 untuk 95 Sales Order                     24,770,500      23,150,000      2,546,500      926,000        24,770,500
                                                PUTERATEL ANDALAN SUKSES, PT, Tagihan
                                                100% atas Pekerjaan Instalasi Kabel Rumah
135    16-Feb-23     MANDIRI      1220011559559 Batch 18 untuk 80 Sales Order                     19,936,400      18,400,000      2,024,000      487,600        19,936,400
                                                PUTERATEL ANDALAN SUKSES, PT, Tagihan
                                                100% atas Pekerjaan Instalasi Kabel Rumah
136    16-Feb-23     MANDIRI      1220011559559 Batch 18 untuk 80 Sales Order                     20,185,605      18,630,000      2,049,300      493,695        20,185,605
                                                BANGUN KELOLA SWADAYA, PT, Penarikan
                                                Kabel FTTH cluster Kedoya Utara RW06
137    16-Feb-23     MANDIRI      1220011559559 (347HP)                                         1,483,715,574   1,369,372,934   150,631,023   36,288,383     1,483,715,574
                                                BANGUN KELOLA SWADAYA, PT, Tagihan
                                                Pelunasan 70% Penarikan Kabel FTTH
                                                cluster Gondrong RW04 (420HP) dan
                                                Rusunawa Cengkareng Tower Dahlia
138    16-Feb-23     MANDIRI      1220011559559 (480HP)                                         1,000,000,000    922,934,933    101,522,843   24,457,776     1,000,000,000

                                                BLAO PRIMA PERKASA, PT, Tagihan 100%
                                                atas Pekerjaan Relokasi Jaringan Utilitas di
139    16-Feb-23     MANDIRI      1220011559559 Kawasan Hotel Shangrila site Wisma Keiai          57,209,855      52,366,000      5,760,260      916,405        57,209,855
                                                DJAJA LISTRIK, PT, Pembelian Joint Closure
                                                96 Core Untuk Kebutuhan Spare Tower
140    20-Feb-23     MANDIRI      1220011559559 Operation Sebanyak 5 Unit                          6,937,500       6,250,000       687,500           -           6,937,500
                                                NOKIA SOLUTIONS and NETWORK
                                                INDONESIA, PT, Tagihan Pelunasan 90%
                                                atas Pengadaan ONT GPON 1GE SC/APC
                                                Project FTTX IKR sebanyak 4500Pcs
141    20-Feb-23     SINARMAS      0000240408 (Pelunasan oleh SKBDN 0722/001/0888/L)            1,527,157,314   1,375,817,400   151,339,914          -       1,527,157,314
                                                ST ENGINEERING ADVANCED NETWORKS &
                                                SENSORS PTE LTD, Pelunasan 70% atas
                                                Pengadaan Fiber Access Terminal sebanyak
                                                2620Pcs (Pelunasan oleh LC
142    20-Feb-23   SINARMAS CNY    0037837897 0722/001/1988)                                    2,902,761,712   2,902,761,712           -            -       2,902,761,712
                                                CORPORATE BUILDING & IN HOUSE
                                                PROJECT, Biaya Supervisi Pekerjaan
                                                Penarikan Kabel Tenant MAP AKTIF
                                                ADIPERKASA TBK, PT (STORE PUMA)
143    24-Feb-23     MANDIRI      1220011559559 Gedung Mall Taman Anggrek - Trf                      636,300         636,300            -            -            636,300
                                                PLN PERSERO, PT, Biaya Penyambungan
                                                Daya PLN Site Rusunawa Cengkareng -
144    24-Feb-23     MANDIRI      1220011559559 FTTH Project                                       7,497,900       7,497,900            -            -           7,497,900
                                                PLN PERSERO, PT, Biaya Penyambungan
145    24-Feb-23     MANDIRI      1220011559559 Daya PLN                                           1,421,500       1,421,500            -            -           1,421,500
                                                PLN PERSERO, PT, Biaya Penyambungan
146    24-Feb-23     MANDIRI      1220011559559 Daya PLN                                           1,421,500       1,421,500            -            -           1,421,500
                                                PLN PERSERO, PT, Biaya Penyambungan
147    24-Feb-23     MANDIRI      1220011559559 Daya PLN                                           1,421,500       1,421,500            -            -           1,421,500
                                                PLN PERSERO, PT, Biaya Penyambungan
148    24-Feb-23     MANDIRI      1220011559559 Daya PLN                                           1,421,500       1,421,500            -            -           1,421,500
                                                PLN PERSERO, PT, Biaya Penyambungan
149    24-Feb-23     MANDIRI      1220011559559 Daya PLN                                           1,421,500       1,421,500            -            -           1,421,500
                                                PLN PERSERO, PT, Biaya Penyambungan
150    24-Feb-23     MANDIRI      1220011559559 Daya PLN                                           1,421,500       1,421,500            -            -           1,421,500
                                                PLN PERSERO, PT, Biaya Penyambungan
151    24-Feb-23     MANDIRI      1220011559559 Daya PLN                                           1,421,500       1,421,500            -            -           1,421,500
                                                NOKIA SOLUTIONS and NETWORK
                                                INDONESIA, PT, Pelunasan 90% Pengadaan
                                                Switch 100GE MPLS Nokia 7210SAS-Sx PS
152    27-Feb-23     SINARMAS      0000240408 DC48V 5unit,                                       188,113,431     169,471,560     18,641,871          -         188,113,431
                                                BANGUN KELOLA SWADAYA, PT, Tagihan
                                                Pelunasan 70% Penarikan Kabel FTTH
                                                cluster Gondrong RW04 (420HP) dan
                                                Rusunawa Cengkareng Tower Dahlia
153    28-Feb-23     MANDIRI      1220011559559 (480HP)                                          892,181,060     823,425,067     90,576,757   21,820,764       892,181,060
Page 9
        TANGGAL                     NOMOR
      PENGELUARAN               REKENING BANK
         DI BANK  REKENING BANK      YANG                                                     NILAI MUTASI                     NILAI YANG DIBAYARKAN
NO.    STATEMENT YANG DIGUNAKAN   DIGUNAKAN          NAMA VENDOR DAN KETERANGAN                  BANK             DPP            PPN            PPh       NET DIBAYARKAN

                                               BANGUN KELOLA SWADAYA, PT, Tagihan
                                               Pelunasan 70% Penarikan Kabel FTTH
                                               cluster Kebayoran Lama Selatan
                                               RW03&RW04 (224HP), Jalan Jembatan Besi
                                               RW02 (171HP), Rempoa RW01 (321HP),
                                               Rangkap Jaya RW01 (504HP), Rangka Jaya
154    01-Mar-23     MANDIRI     1220011559559 RW03 (280HP) dan Rawasari RW02 (191HP)          2,200,000,000   2,030,456,853   223,350,254   53,807,107     2,200,000,000
                                               PRYSMIAN CABLES INDONESIA, PT, Uang
                                               Muka Beban Umum atas Giro Mundur 180
                                               Hari untuk pengadaan Kabel ADSS untuk
                                               kebutuhan FTTX Project - PO : 1010031761 -
155    01-Mar-23     MANDIRI     1220011559559 Trf                                              871,421,040     871,421,040            -            -         871,421,040
                                               PUTERATEL ANDALAN SUKSES, PT, Tagihan
                                               100% atas Pekerjaan Instalasi Kabel Rumah
156    01-Mar-23     MANDIRI     1220011559559 Batch 22 untuk 81 Sales Order                     20,185,605      18,630,000      2,049,300      493,695        20,185,605

                                               PUTERATEL ANDALAN SUKSES, PT,
                                               Pembelian Optical Drop With Messenger 4
157    01-Mar-23     MANDIRI     1220011559559 Core 1000M untuk Troubleshoot Corporate           15,318,000      13,800,000      1,518,000          -          15,318,000
                                               PUTERATEL ANDALAN SUKSES, PT, Tagihan
                                               100% atas Pekerjaan Instalasi Kabel Rumah
158    01-Mar-23     MANDIRI     1220011559559 Batch 20 untuk 81 Sales Order                     20,185,605      18,630,000      2,049,300      493,695        20,185,605
                                               PUTERATEL ANDALAN SUKSES, PT, Tagihan
                                               100% atas Pekerjaan Instalasi Kabel Rumah
159    01-Mar-23     MANDIRI     1220011559559 Batch 21 untuk 81 Sales Order                     20,185,605      18,630,000      2,049,300      493,695        20,185,605
                                               TADYA MANDIRI SINERGI, PT, Tagihan 90%
                                               atas Pekerjaan Penarikan Kabel Udara Final
                                               Kota Bandung - Diskominfo Kota Bandung -
160    01-Mar-23     MANDIRI     1220011559559 CCTV Jl.Braga                                      5,240,260       4,897,440       538,718       195,898         5,240,260
                                               TADYA MANDIRI SINERGI, PT, Tagihan 90%
                                               atas Pekerjaan Penarikan Kabel Udara Final
                                               Kota Cirebon-816985 CSR Diskominfo
161    01-Mar-23     MANDIRI     1220011559559 Cirebon                                            7,226,352       6,753,600       742,896       270,144         7,226,352

                                               TADYA MANDIRI SINERGI, PT, Tagihan 90%
                                               atas Pekerjaan Penarikan Kabel Udara Final
162    01-Mar-23     MANDIRI     1220011559559 di DPRD Cipinang Melayu RW02                       6,307,433       5,894,798       648,427       235,792         6,307,433
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Jl. Tentara Pelajar-C01 - CCTV
163    01-Mar-23     MANDIRI     1220011559559 Project DKI                                        1,421,500       1,421,500            -            -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Harmoni-C02 - CCTV Project
164    01-Mar-23     MANDIRI     1220011559559 DKI                                                1,421,500       1,421,500            -            -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Harmoni-C01 - CCTV Project
165    01-Mar-23     MANDIRI     1220011559559 DKI                                                1,421,500       1,421,500            -            -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Jl. Strategi Raya-C01 - CCTV
166    01-Mar-23     MANDIRI     1220011559559 Project DKI                                        1,421,500       1,421,500            -            -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Gg. Koba-C01 - CCTV Project
167    01-Mar-23     MANDIRI     1220011559559 DKI                                                1,421,500       1,421,500            -            -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Jl. Masjid Al-Makmur-C01 -
168    01-Mar-23     MANDIRI     1220011559559 CCTV Project DKI                                   1,421,500       1,421,500            -            -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Jl. Dermaga Ujung-C01 -
169    01-Mar-23     MANDIRI     1220011559559 CCTV Project DKI                                   1,421,500       1,421,500            -            -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Jl. Pondok Karya-C01 - CCTV
170    01-Mar-23     MANDIRI     1220011559559 Project DKI                                        1,421,500       1,421,500            -            -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Pasar Tanah Abang-C05 -
171    01-Mar-23     MANDIRI     1220011559559 CCTV Project DKI                                   1,421,500       1,421,500            -            -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Pasar Tanah Abang-C04 -
172    01-Mar-23     MANDIRI     1220011559559 CCTV Project DKI                                   1,421,500       1,421,500            -            -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Pasar Tanah Abang-C03 -
173    01-Mar-23     MANDIRI     1220011559559 CCTV Project DKI                                   1,421,500       1,421,500            -            -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Pasar Tanah Abang-C02 -
174    01-Mar-23     MANDIRI     1220011559559 CCTV Project DKI                                   1,421,500       1,421,500            -            -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Pasar Tanah Abang-C01 -
175    01-Mar-23     MANDIRI     1220011559559 CCTV Project DKI                                   1,421,500       1,421,500            -            -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Halte Stasiun Pal Merah-C01 -
176    01-Mar-23     MANDIRI     1220011559559 CCTV Project DKI                                   1,421,500       1,421,500            -            -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Glodok-C03 - CCTV Project
177    01-Mar-23     MANDIRI     1220011559559 DKI                                                1,421,500       1,421,500            -            -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Jl. Binawarga-C01 - CCTV
178    01-Mar-23     MANDIRI     1220011559559 Project DKI                                        1,421,500       1,421,500            -            -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Jl. Swadarma-C02 - CCTV
179    01-Mar-23     MANDIRI     1220011559559 Project DKI                                        1,421,500       1,421,500            -            -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Jl. Swadarma-C01 - CCTV
180    01-Mar-23     MANDIRI     1220011559559 Project DKI                                        1,421,500       1,421,500            -            -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Seskoal-C01 - CCTV Project
181    01-Mar-23     MANDIRI     1220011559559 DKI                                                1,421,500       1,421,500            -            -           1,421,500
Page 10
        TANGGAL                     NOMOR
      PENGELUARAN               REKENING BANK
         DI BANK  REKENING BANK      YANG                                                     NILAI MUTASI                       NILAI YANG DIBAYARKAN
NO.    STATEMENT YANG DIGUNAKAN   DIGUNAKAN        NAMA VENDOR DAN KETERANGAN                    BANK             DPP              PPN            PPh       NET DIBAYARKAN
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Jl. Tentara Pelajar-C02 - CCTV
182    01-Mar-23     MANDIRI     1220011559559 Project DKI                                        1,421,500       1,421,500               -           -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Jl. Pulo Raya IV-C01 - CCTV
183    01-Mar-23     MANDIRI     1220011559559 Project DKI                                        1,421,500       1,421,500               -           -           1,421,500
                                               ANDALAN KREATIF UTAMA, PT, Tagihan
                                               Retensi 10% atas Pekerjaan Penarikan
                                               Kabel Tanam Final untuk Dinas Komunikasi,
                                               Informatika dan Statistik Provinsi DKI
                                               Jakarta (Penyedia Internet untuk Publik) -
184    02-Mar-23     MANDIRI     1220011559559 (Gedung PPOP Ragunan)                              7,525,708       7,033,372          773,671      281,335         7,525,708
                                               MONETI INDO TEKNO, PT, Pembelian
                                               Fusion Spalicer (Alat Sambung Kabel FO
185    02-Mar-23     MANDIRI     1220011559559 INNO View 3) Sebanyak 9 Unit                     383,616,000     345,600,000       38,016,000          -         383,616,000

                                               SIGMA DAYA RAMADHAN, PT, Tagihan 90%
                                               atas Pekerjaan Penarikan Kabel Udara Final
186    02-Mar-23     MANDIRI     1220011559559 Jakarta Pusat - Rajawali Putra Mahkota             8,106,896       7,420,500          816,255      129,859         8,106,896

                                               SIGMA DAYA RAMADHAN, PT, Tagihan 90%
                                               atas Pekerjaan Penarikan Kabel Udara Final
187    02-Mar-23     MANDIRI     1220011559559 DKI Jakarta - Tamansari Parama                    11,682,976      10,693,800         1,176,318     187,142        11,682,976
                                               ASIA TELCO NETWORKS, PT, Pembelian
                                               Panel Box KWH & CCTV L 400MM W
188    03-Mar-23     MANDIRI     1220011559559 250MM H 500 MM Sebanyak 15 Unit                   14,568,750      13,125,000         1,443,750         -          14,568,750
                                               COMMUNICATION CABLE SYSTEMS
                                               INDONESIA, PT, Uang Muka Beban Umum
                                               atas Pembayaran DP untuk pengadaan
                                               kabel ADSS vendor PT CCSI - PO :
189    03-Mar-23     MANDIRI     1220011559559 1010035412 - Trf                                 673,339,320     606,612,000       66,727,320          -        673,339,320
                                               FURUKAWA OPTICAL SOLUTIONS
                                               INDONESIA, PT, Tagihan 100% atas
                                               Pengadaan Optical Drop Cable 1 Core with
                                               Messanger untuk kebutuhan IKR sebanyak
190    03-Mar-23     MANDIRI     1220011559559 84.000 Mtr                                       195,804,000     176,400,000       19,404,000          -        195,804,000
                                               TADYA MANDIRI SINERGI, PT, Tagihan 90%
                                               atas Pekerjaan Penarikan Kabel Udara Final
                                               Kota Bandung - CCTV Bandung -
                                               (Monitoring ke Gedung Kominfo Kota
191    03-Mar-23     MANDIRI     1220011559559 Bandung)                                           4,204,121       3,929,085          432,199      157,163         4,204,121
                                               ALIP PUTRA, CV, Biaya Pembelian 100 Buah
                                               Plate Wifi Aluminium untuk keperluan sign
192    06-Mar-23     MANDIRI     1220011559559 Free Wifi area Bandung                             5,000,000       5,000,000               -           -           5,000,000
                                               NOKIA SOLUTIONS and NETWORK
                                               INDONESIA, PT, Pelunasan 90% atas
                                               Pengadaan Wifi Beacon Dual Band AC1200
                                               2XGE EUPLUG HA-020W-B Nokia Project
                                               FTTX IKR sebanyak 4500 Unit (Pelunasan
193    06-Mar-23     SINARMAS     0000240408 oleh SKBDN 0722/001/0889/L)                       2,776,654,566   2,501,490,600   275,163,966.00         -       2,776,654,566
                                               PLN PERSERO, PT, Biaya Pasang baru Daya
194    06-Mar-23     MANDIRI     1220011559559 1300VA PLN Site Perempatan Pemda                   1,421,500       1,421,500               -           -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Stasiun Juanda-C02 - CCTV
195    06-Mar-23     MANDIRI     1220011559559 Project DKI                                        1,421,500       1,421,500               -           -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Jl. Cempaka Putih Barat-C01 -
196    06-Mar-23     MANDIRI     1220011559559 CCTV Project DKI                                   1,421,500       1,421,500               -           -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Bulungan-C01 - CCTV Project
197    06-Mar-23     MANDIRI     1220011559559 DKI                                                1,421,500       1,421,500               -           -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Gg. Jenggot-C01 - CCTV
198    06-Mar-23     MANDIRI     1220011559559 Project DKI                                        1,421,500       1,421,500               -           -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Jl. Lingkungan-C01 - CCTV
199    06-Mar-23     MANDIRI     1220011559559 Project DKI                                        1,421,500       1,421,500               -           -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Stasiun Gambir-C01 - CCTV
200    06-Mar-23     MANDIRI     1220011559559 Project DKI                                        1,421,500       1,421,500               -           -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Glodok-C04 - CCTV Project
201    06-Mar-23     MANDIRI     1220011559559 DKI                                                1,421,500       1,421,500               -           -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Kavling Hankam Joglo-C01 -
202    06-Mar-23     MANDIRI     1220011559559 CCTV Project DKI                                   1,421,500       1,421,500               -           -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Sarinah-C01 - CCTV Project
203    06-Mar-23     MANDIRI     1220011559559 DKI                                                1,421,500       1,421,500               -           -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Pasar Warung Buncit-C01 -
204    06-Mar-23     MANDIRI     1220011559559 CCTV Project DKI                                   1,421,500       1,421,500               -           -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Jl. Bang Pitung-C01 - CCTV
205    06-Mar-23     MANDIRI     1220011559559 Project DKI                                        1,421,500       1,421,500               -           -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Marunda Pulo-C01 - CCTV
206    06-Mar-23     MANDIRI     1220011559559 Project DKI                                        1,421,500       1,421,500               -           -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Gandaria City-C01 - CCTV
207    06-Mar-23     MANDIRI     1220011559559 Project DKI                                        1,421,500       1,421,500               -           -           1,421,500
Page 11
        TANGGAL                     NOMOR
      PENGELUARAN               REKENING BANK
         DI BANK  REKENING BANK      YANG                                                   NILAI MUTASI                     NILAI YANG DIBAYARKAN
NO.    STATEMENT YANG DIGUNAKAN   DIGUNAKAN        NAMA VENDOR DAN KETERANGAN                  BANK             DPP            PPN            PPh       NET DIBAYARKAN
                                               YANTJE TAMAWIWY, Paket Pekerjaan
                                               Activation For New Services Corporate
                                               Delivery Mitra Sukses Multikreasi
                                               DSM,Mevui Kuta Beachfront DSM ,PT.
                                               Global Teknologi Niaga (Samsung) (PO
                                               Rp.2.614.124,- Potongan PPh 21(2.5%)
208    07-Mar-23     SINARMAS     00002999994 Rp.65.353,- )                                     2,548,771       2,614,124            -         65,353        2,548,771
                                               BANGUN KELOLA SWADAYA, PT, Tagihan
                                               100% Pekerjaan Pembangunan Pondasi
209    07-Mar-23     MANDIRI     1220011559559 ODC cluster ODC SRBY09 dan SRBY10               68,592,545      63,306,456      6,963,710    1,677,621       68,592,545

                                               BANGUN KELOLA SWADAYA, PT, Tagihan
                                               Pelunasan 70% Penarikan Kabel FTTH
                                               cluster Kebayoran Lama Selatan
                                               RW03&RW04 (224HP), Jalan Jembatan Besi
                                               RW02 (171HP), Rempoa RW01 (321HP),
                                               Rangkap Jaya RW01 (504HP), Rangka Jaya
210    07-Mar-23     MANDIRI     1220011559559 RW03 (280HP) dan Rawasari RW02 (191HP)        1,355,197,969   1,250,759,547   137,583,550   33,145,128     1,355,197,969
                                               KALYANA MITRA LESTARI, PT, Tagihan 90%
                                               atas Pekerjaan Penarikan Kabel Udara Final
211    07-Mar-23     MANDIRI     1220011559559 di PT BGR Logistik Indonesia                     7,041,053       6,444,900       708,939       112,786         7,041,053
                                               KALYANA MITRA LESTARI, PT, Tagihan 90%
                                               atas Pekerjaan Penarikan Kabel Tanam
                                               Final untuk Jakarta Timur di Kalbe Farma
212    07-Mar-23     MANDIRI     1220011559559 International                                   32,762,972      29,988,990      3,298,789      524,807       32,762,972
                                               INFRA YES SOLUSINDO, PT, Jasa Penarikan
                                               dan Supervisi 12 SO Batch 31 di
213    08-Mar-23     MANDIRI     1220011559559 Apartement Green Pramuka                         4,116,000       4,200,000            -         84,000         4,116,000
                                               INFRA YES SOLUSINDO, PT, Jasa Penarikan
                                               dan Supervisi 12 SO Batch 30 di
214    08-Mar-23     MANDIRI     1220011559559 Apartement Green Pramuka                         4,116,000       4,200,000            -         84,000         4,116,000
                                               INFRA YES SOLUSINDO, PT, Jasa Penarikan
                                               dan Supervisi 12 SO Batch 32 di
215    08-Mar-23     MANDIRI     1220011559559 Apartement Green Pramuka                         4,116,000       4,200,000            -         84,000         4,116,000
                                               PANCA PUTRA SOLUSINDO, PT, Pembelian
                                               NVR Hikvision 64 Channel Sebanyak1 LUMP
                                               SUM, Seagate Skyhawk Sebanyak 7 LUMP
216    08-Mar-23     MANDIRI     1220011559559 SUM                                             75,102,600      67,660,000      7,442,600          -          75,102,600
                                               BANGUN KELOLA SWADAYA, PT, Tagihan
                                               Pelunasan 70% Penarikan Kabel FTTH
                                               Rangkap Jaya RW02(294HP),Meruyung
                                               RW11(631HP),Beji Timur
                                               RW03(168HP),BejiTimur
                                               RW01(238HP),Kreo RW007(226HP),Kreo
                                               RW013 (154HP),Kreo
                                               RW009(224HP)JalanJembatanBesi
217    09-Mar-23     MANDIRI     1220011559559 RW03(200HP),Kreo RW06&RW10                    1,600,000,000   1,476,695,893   162,436,548   39,132,441     1,600,000,000
                                               FURUKAWA OPTICAL SOLUTIONS
                                               INDONESIA, PT, Tagihan 100% atas
                                               Pengadaan Optical Drop Cable 1 Core with
                                               Messanger untuk kebutuhan IKR sebanyak
218    10-Mar-23     MANDIRI     1220011559559 60.000 Mtr                                     139,860,000     126,000,000     13,860,000          -        139,860,000
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Jl. Buluh-C01 - CCTV Project
219    10-Mar-23     MANDIRI     1220011559559 DKI                                              1,421,500       1,421,500            -            -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Jl. Jatinegara Kaum-C01 -
220    10-Mar-23     MANDIRI     1220011559559 CCTV Project DKI                                 1,421,500       1,421,500            -            -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Jl. Cipinang Baru Raya-C01 -
221    10-Mar-23     MANDIRI     1220011559559 CCTV Project DKI                                 1,421,500       1,421,500            -            -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Jl. Sodong Raya-C01 - CCTV
222    10-Mar-23     MANDIRI     1220011559559 Project DKI                                      1,421,500       1,421,500            -            -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Komplek Joglo Baru-C01 -
223    10-Mar-23     MANDIRI     1220011559559 CCTV Project DKI                                 1,421,500       1,421,500            -            -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site JPO Senayan-C01 - CCTV
224    10-Mar-23     MANDIRI     1220011559559 Project DKI                                      1,421,500       1,421,500            -            -           1,421,500
                                               MONETI INDO TEKNO, PT, Pembelian Joint
                                               Closure 96 Core 3 Unit, Joint Closure 24
                                               Core 3 Unit, Joint Closure 48 Core 2 Unit,
225    13-Mar-23     MANDIRI     1220011559559 Cable Ties Nylon 50 cm 400 Pcs                   8,524,800       7,680,000       844,800           -          8,524,800

                                               ALPHA CIPTA COMPUTINDO, PT, Pembelian
                                               Rack Close Wallmount 19 Inch 4U Depth
226    13-Mar-23     MANDIRI     1220011559559 450 MM Indoor Sebanyak 5 Unit                    8,602,500       7,750,000       852,500           -          8,602,500

                                               ALPHA CIPTA COMPUTINDO, PT, Pembelian
                                               Cable Network UTP CAT-5E Pengadaan
                                               Aksesoris IKR Q4 2022 Untuk 13500 Home
                                               Connect 7.015 MTR, Connector RJ_45 Cat 5
227    13-Mar-23     MANDIRI     1220011559559 Commscope 4.550 Pcs                             46,422,420      41,822,000      4,600,420          -         46,422,420
                                               ALPHA CIPTA COMPUTINDO, PT, Pembelian
                                               TP-LINK Archer T2U Nano AC600 Nano
                                               Wireless USB Adapter WIFI Dual Band
228    13-Mar-23     MANDIRI     1220011559559 Sebanyak 5 Pcs                                     832,500         750,000        82,500           -            832,500
                                               MONETI INDO TEKNO, PT, Pembelian Cable
                                               Network UTP Cat 6 With Connector 3M
229    13-Mar-23     MANDIRI     1220011559559 Sebanyak 100 Unit                                7,770,000       7,000,000       770,000           -          7,770,000
Page 12
        TANGGAL                     NOMOR
      PENGELUARAN               REKENING BANK
         DI BANK  REKENING BANK      YANG                                                    NILAI MUTASI                       NILAI YANG DIBAYARKAN
NO.    STATEMENT YANG DIGUNAKAN   DIGUNAKAN        NAMA VENDOR DAN KETERANGAN                   BANK             DPP              PPN            PPh         NET DIBAYARKAN
                                               BANGUN KELOLA SWADAYA, PT, Tagihan
                                               Pelunasan 70% Penarikan Kabel FTTH
                                               Rangkap Jaya RW02(294HP),Meruyung
                                               RW11(631HP),Beji Timur
                                               RW03(168HP),BejiTimur
                                               RW01(238HP),Kreo RW007(226HP),Kreo
                                               RW013 (154HP),Kreo
                                               RW009(224HP)JalanJembatanBesi
230    14-Mar-23     MANDIRI     1220011559559 RW03(200HP),Kreo RW06&RW10                     3,000,000,000   2,768,804,799     304,568,528     73,373,327     3,000,000,000
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Jl. Manggarai Utara 2-C01 -
231    14-Mar-23     MANDIRI     1220011559559 CCTV Project DKI                                  1,421,500       1,421,500               -             -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Stasiun Juanda-C01 - CCTV
232    14-Mar-23     MANDIRI     1220011559559 Project DKI                                       1,421,500       1,421,500               -             -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Jl. Amalia-C01 - CCTV Project
233    14-Mar-23     MANDIRI     1220011559559 DKI                                               1,421,500       1,421,500               -             -           1,421,500
                                               KALIABANG JAYA PRATAMA, PT, Tagihan
                                               100% atas Pekerjaan Swap Box Panel &
                                               Mikrotik Jakwifi Site Pejaten Timur
                                               RW07,Cakung Timur RW08,Rawa Badak
                                               Utara RW05,Pegangsaan Dua
                                               RW03,Cilincing RW08 & RW09,Kalibaru
                                               RW15,Ancol RW04,Tugu Selatan
234    16-Mar-23     MANDIRI     1220011559559 RW03,Papango RW05                                21,587,654      19,924,000         2,191,640      527,986         21,587,654
                                               KALIABANG JAYA PRATAMA, PT, Tagihan
                                               100% atas Pekerjaan Swap Box Panel &
                                               Mikrotik Jakwifi Site Pasar Manggis
                                               RW06,Kebayoran Lama Selatan RW11,Bale
                                               Kambang RW05,Kayu Putih
                                               RW16,Penggilingan RW07 &
                                               RW05,Sukapura RW01,Rawa Badak Selatan
235    16-Mar-23     MANDIRI     1220011559559 RW09,Tugu Utara RW06                             15,873,275      14,650,000         1,611,500      388,225         15,873,275
                                               BANGUN KELOLA SWADAYA, PT, Tagihan
                                               100% Pekerjaan Upgrading Infrastruktur
236    17-Mar-23     MANDIRI     1220011559559 FTTH sebanyak 79.217 HP                        7,000,000,000   6,460,544,532   710,659,898.48   171,204,430     7,000,000,000
                                               BANGUN KELOLA SWADAYA, PT, Tagihan
                                               Pelunasan 70% Penarikan Kabel FTTH
                                               Rangkap Jaya RW02(294HP),Meruyung
                                               RW11(631HP),Beji Timur
                                               RW03(168HP),BejiTimur
                                               RW01(238HP),Kreo RW007(226HP),Kreo
                                               RW013 (154HP),Kreo
                                               RW009(224HP)JalanJembatanBesi
237    17-Mar-23     MANDIRI     1220011559559 RW03(200HP),Kreo RW06&RW10                      933,578,389     861,632,108       94,779,532     22,833,251       933,578,389
                                               BANGUN KELOLA SWADAYA, PT, Tagihan
                                               100% Pekerjaan Upgrading Infrastruktur
238    20-Mar-23     MANDIRI     1220011559559 FTTH sebanyak 79.217 HP                         500,000,000     461,467,467       50,761,421     12,228,888       500,000,000
                                               BANGUN KELOLA SWADAYA, PT, Tagihan
                                               100% Pekerjaan Upgrading Infrastruktur
239    20-Mar-23     MANDIRI     1220011559559 FTTH sebanyak 79.217 HP                        7,000,000,000   6,460,544,532     710,659,898    171,204,430     7,000,000,000
                                               CIPTA KARYA TECHNOLOGY, PT, Tagihan
                                               100% atas Pekerjaan Instalasi Kabel Rumah
240    20-Mar-23     MANDIRI     1220011559559 Batch 18 untuk 60 Sales Order                    14,952,300      13,800,000         1,518,000      365,700         14,952,300
                                               CIPTA KARYA TECHNOLOGY, PT, Tagihan
                                               100% atas Pekerjaan Instalasi Kabel Rumah
241    20-Mar-23     MANDIRI     1220011559559 Batch 21 untuk 60 Sales Order                    14,952,300      13,800,000         1,518,000      365,700         14,952,300
                                               SKALA GLOBAL SEJATI, PT, Pembelian CCTV -
                                               Hikvision - DS - 2CD2725FWD IZS Sebanyak
242    20-Mar-23     MANDIRI     1220011559559 4 LUMP SUM                                       12,498,600      11,260,000         1,238,600           -          12,498,600
                                               INDOKARYA SUKSES BERSAMA, PT, Biaya
                                               Supervisi Batch 5 sebanyak 33 SO di
243    20-Mar-23     MANDIRI     1220011559559 Apartement Paradise Mansion                       4,950,010       5,500,011               -        550,001          4,950,010
                                               ACA PACIFIC, PT, DP 50% atas Pengadaan
                                               Firewall SRX4200 Juniper dan Router
244    21-Mar-23     MANDIRI     1220011559559 MX204 Juniper sebanyak 1 Unit                   244,900,000     244,900,000               -             -         244,900,000
                                               ACA PACIFIC, PT, DP 50% atas Pengadaan
                                               Firewall SRX4200 Juniper dan Router
245    21-Mar-23     MANDIRI     1220011559559 MX204 Juniper sebanyak 1 Unit - PPN              26,939,000              -        26,939,000            -          26,939,000
                                               DIRGA BAHARI PERKASA, PT, Tagihan
                                               Pelunasan 70% atas Pengadaan CCTV DS-
                                               2CT4T43G2-IS Hikvision sebanyak 200 unit
                                               dan DS-2CT4051G0-I Hikvision sebanyak
246    21-Mar-23     MANDIRI     1220011559559 2.000 Unit                                     1,968,438,902   1,773,368,380     195,070,522            -       1,968,438,902
                                               KONSTRUKSI BAJA CIKANDE, PT, Tagihan
                                               100% atas Pengadaan Tiang Penyangga
247    21-Mar-23     MANDIRI     1220011559559 Kabel Optik 9M sebanyak 50 Unit                 113,497,500     102,250,000       11,247,500            -         113,497,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Stasiun Jl. Tanah Pasir-C01 -
248    21-Mar-23     MANDIRI     1220011559559 CCTV Project DKI                                  1,421,500       1,421,500               -             -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Stasiun JIS-C02 - CCTV
249    21-Mar-23     MANDIRI     1220011559559 Project DKI                                       1,421,500       1,421,500               -             -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Stasiun Gg. Printis-C01 -
250    21-Mar-23     MANDIRI     1220011559559 CCTV Project DKI                                  1,421,500       1,421,500               -             -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Stasiun Jl. Pakin-C01 - CCTV
251    21-Mar-23     MANDIRI     1220011559559 Project DKI                                       1,421,500       1,421,500               -             -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Stasiun Jl. Tongkol-C01 -
252    21-Mar-23     MANDIRI     1220011559559 CCTV Project DKI                                  1,421,500       1,421,500               -             -           1,421,500
Page 13
        TANGGAL                     NOMOR
      PENGELUARAN               REKENING BANK
         DI BANK  REKENING BANK      YANG                                                     NILAI MUTASI                     NILAI YANG DIBAYARKAN
NO.    STATEMENT YANG DIGUNAKAN   DIGUNAKAN        NAMA VENDOR DAN KETERANGAN                    BANK             DPP            PPN            PPh        NET DIBAYARKAN
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Stasiun Jl. Krapu -C01 - CCTV
253    21-Mar-23     MANDIRI     1220011559559 Project DKI                                        1,421,500       1,421,500            -             -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Stasiun Jl. Muara Baru Ujung-
254    21-Mar-23     MANDIRI     1220011559559 C01 - CCTV Project DKI                             1,421,500       1,421,500            -             -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Stasiun Jl. Pulo Gundul II-C01
255    21-Mar-23     MANDIRI     1220011559559 - CCTV Project DKI                                 1,421,500       1,421,500            -             -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Stasiun Jl. Pluit Raya-C01 -
256    21-Mar-23     MANDIRI     1220011559559 CCTV Project DKI                                   1,421,500       1,421,500            -             -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Stasiun Jl. H. Ipin-C01 - CCTV
257    21-Mar-23     MANDIRI     1220011559559 Project DKI                                        1,421,500       1,421,500            -             -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Stasiun ITC Mangga Dua-C03 -
258    21-Mar-23     MANDIRI     1220011559559 CCTV Project DKI                                   1,421,500       1,421,500            -             -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Stasiun Cawang-C01 - CCTV
259    21-Mar-23     MANDIRI     1220011559559 Project DKI                                        1,421,500       1,421,500            -             -           1,421,500
                                               BINTANG MAS UTAMA, CV, Biaya
                                               Pembelian TP-Link MC 210 CS Media
                                               Converter (PO Rp.1.387.500,- PPN
260    24-Mar-23     SINARMAS     00002999994 Rp.137.500,- )                                      1,387,500       1,250,000       137,500            -           1,387,500
                                               BANGUN KELOLA SWADAYA, PT, Tagihan
                                               100% Pekerjaan Upgrading Infrastruktur
261    24-Mar-23     SINARMAS      0000240408 FTTH sebanyak 79.217 HP                          2,000,000,000   1,845,869,866   203,045,685    48,915,551     2,000,000,000
                                               COMMUNICATION CABLE SYSTEMS
                                               INDONESIA, PT, Uang Muka Beban Umum
                                               atas Pembayaran Cek/Giro Mundur 30 Hari
                                               untuk pengadaan kabel ADSS - PO :
262    24-Mar-23     MANDIRI     1220011559559 1010035412 - Trf                                1,293,705,000   1,165,500,000   128,205,000           -       1,293,705,000
                                               BANGUN KELOLA SWADAYA, PT, Tagihan
                                               100% Pekerjaan Upgrading Infrastruktur
263    27-Mar-23     MANDIRI     1220011559559 FTTH sebanyak 79.217 HP                         8,391,169,655   7,744,503,604   851,895,396   205,229,346     8,391,169,655
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Jl. Kp. Bandan-C01 - CCTV
264    27-Mar-23     MANDIRI     1220011559559 Project DKI                                        1,421,500       1,421,500            -             -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Jl. Pulo Mas-C01 - CCTV
265    27-Mar-23     MANDIRI     1220011559559 Project DKI                                        1,421,500       1,421,500            -             -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Jl. Pulo Nangka-C01 - CCTV
266    27-Mar-23     MANDIRI     1220011559559 Project DKI                                        1,421,500       1,421,500            -             -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Jl. Raya Bogor-C02 - CCTV
267    27-Mar-23     MANDIRI     1220011559559 Project DKI                                        1,421,500       1,421,500            -             -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Jl. Raya Bogor-C04 - CCTV
268    27-Mar-23     MANDIRI     1220011559559 Project DKI                                        1,421,500       1,421,500            -             -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Jl. Raya Bogor-C07 - CCTV
269    27-Mar-23     MANDIRI     1220011559559 Project DKI                                        1,421,500       1,421,500            -             -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Jl. Raya Kalibata-C01 - CCTV
270    27-Mar-23     MANDIRI     1220011559559 Project DKI                                        1,421,500       1,421,500            -             -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Stasiun Sudirman-C01 - CCTV
271    27-Mar-23     MANDIRI     1220011559559 Project DKI                                        1,421,500       1,421,500            -             -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Jl. Pahlawan-C01 - CCTV
272    27-Mar-23     MANDIRI     1220011559559 Project DKI                                        1,421,500       1,421,500            -             -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Jl. Balap Sepeda IV -C01 -
273    27-Mar-23     MANDIRI     1220011559559 CCTV Project DKI                                   1,421,500       1,421,500            -             -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Jl. Jemb. Besi VII -C01 - CCTV
274    27-Mar-23     MANDIRI     1220011559559 Project DKI                                        1,421,500       1,421,500            -             -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Jl. Kapuk Kb. Jahe-C01 - CCTV
275    27-Mar-23     MANDIRI     1220011559559 Project DKI                                        1,421,500       1,421,500            -             -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Jl. Raya Casablanca-C01 -
276    27-Mar-23     MANDIRI     1220011559559 CCTV Project DKI                                   1,421,500       1,421,500            -             -           1,421,500
                                               PLN PERSERO, PT, Biaya Penyambungan
                                               Daya PLN Site Stasiun Tebet-C01 - CCTV
277    27-Mar-23     MANDIRI     1220011559559 Project DKI                                        1,421,500       1,421,500            -             -           1,421,500
                                               MONETI INDO TEKNO, PT, Pembelian Lan
                                               Testes Punkal TCT 1620 1 Unit, Cable Slitter
                                               Fiber Optic ADSS Tool 1 Pcs, Protection
                                               Sleeve Dw Diameter 5 mm Panjang 6 cm
278    28-Mar-23     MANDIRI     1220011559559 200 Pcs,dll                                        3,230,100       2,910,000       320,100            -           3,230,100
                                               ASIA TELCO NETWORKS, PT, Cable Network
                                               UTP Cat-6 No Connector 12.200 mtr, Cable
                                               Network UTP Cat 6 With Connector 3M 50
279    28-Mar-23     MANDIRI     1220011559559 Unit                                             102,972,203      92,767,750     10,204,453           -         102,972,203

                                               MEDIA SOLUSI NETWORK, PT, Tagihan 90%
                                               atas Pekerjaan Penarikan Kabel Udara Final
                                               Kota Bandung - AP Cihampelas (4 Titik) &
280    28-Mar-23     MANDIRI     1220011559559 AP Segmen Braga (18 Titik)                        42,337,481      39,567,739      4,352,451     1,582,709        42,337,481
Page 14
        TANGGAL                     NOMOR
      PENGELUARAN               REKENING BANK
         DI BANK  REKENING BANK      YANG                                                      NILAI MUTASI                        NILAI YANG DIBAYARKAN
NO.    STATEMENT YANG DIGUNAKAN   DIGUNAKAN         NAMA VENDOR DAN KETERANGAN                    BANK              DPP              PPN            PPh       NET DIBAYARKAN
                                                MONETI INDO TEKNO, PT, Pembelian Cable
                                                Ties 10 cm White 950 Pcs, Cable Ties 10 cm
                                                Black 2.500 Pcs, Cable Ties 10 cm Black
281    28-Mar-23     MANDIRI      1220011559559 Outdoor 950 Pcs, dll                               3,038,625        2,737,500          301,125          -            3,038,625
                                                MONETI INDO TEKNO, PT, Pembelian
                                                Schoen BC Aluminium Insulated Ring 10
282    28-Mar-23     MANDIRI      1220011559559 mm Yellow Sebanyak 400 Pcs                         1,043,400          940,000          103,400          -            1,043,400
                                                MONETI INDO TEKNO, PT, Pembelian POE 8
                                                Port Injector Power Supply 12 V to 48 V 50
283    28-Mar-23     MANDIRI      1220011559559 pcs                                                8,325,000        7,500,000          825,000          -            8,325,000
                                                TELCO ABADI JAYA, PT, Pembelian
                                                Patchcord SM Duplex LC/UPC-SC/APC 2MM
284    28-Mar-23     MANDIRI      1220011559559 3M Sebanyak 5 Pcs                                    249,750          225,000           24,750          -              249,750
                                                TELCO ABADI JAYA, PT, Pembelian Cable
                                                Network UTP CAT-5E Sebanyak 3.660 Mtr,
                                                Cable Network UTP CAT-6 No Connector
285    28-Mar-23     MANDIRI      1220011559559 Sebanyak 3.050 Mtr                                44,677,500       40,250,000         4,427,500         -           44,677,500
                                                NOKIA SOLUTIONS and NETWORK
                                                INDONESIA, PT, Pelunasan 90% atas
                                                Pengadaan Mini OLT sebanyak 24unit
286    29-Mar-23   SINARMAS IDR    0000240408 (Pelunasan oleh SKBDN 1022/001/0907/L)            1,185,369,130    1,067,900,117   117,469,012.88         -         1,185,369,130
                                                NOKIA SOLUTIONS and NETWORK
                                                INDONESIA, PT, Pelunasan 90% atas
                                                Pengadaan ONT GPON 1GE SC/APC Batch 2
                                                sebanyak 2668Pcs (Pelunasan oleh SKBDN
287    29-Mar-23     SINARMAS      0000240408 1022/001/0906/L)                                   928,217,861      836,232,307     91,985,553.79         -          928,217,861
                                                NOKIA SOLUTIONS and NETWORK
                                                INDONESIA, PT, Pelunasan 90% atas
                                                Pengadaan ONT GPON 1GE SC/APC
                                                sebanyak 1.832unit (Pelunasan oleh SKBDN
288    29-Mar-23     SINARMAS      0000240408 0922/001/0902/L)                                   606,055,290      545,995,757     60,059,533.24         -          606,055,290
                                                NOKIA SOLUTIONS and NETWORK
                                                INDONESIA, PT, Tagihan Pelunasan 90%
                                                atas Pengadaan OLT 7360 FX-4 ISAM FX
289    29-Mar-23     SINARMAS      0000240408 (Pelunasan oleh SKBDN 0123/001/0929/L)             843,577,260      759,979,514     83,597,746.49         -          843,577,260
                                                NOKIA SOLUTIONS and NETWORK
                                                INDONESIA, PT, Pelunasan 90% atas
                                                Pengadaan ONT GPON 1GE SC/APC
                                                sebanyak 2.668unit (Pelunasan oleh SKBDN
290    29-Mar-23     SINARMAS      0000240408 0922/001/0902/L)                                   959,529,558      864,441,043     95,088,514.76         -          959,529,558
                                                NOKIA SOLUTIONS and NETWORK
                                                INDONESIA, PT, Pelunasan 90% atas
                                                Pengadaan ONT GPON 1GE SC/APC Batch 2
                                                sebanyak 1832Pcs (Pelunasan oleh SKBDN
291    29-Mar-23     SINARMAS      0000240408 1022/001/0906/L)                                   637,366,987      574,204,493     63,162,494.21         -          637,366,987
                                                PLN PERSERO, PT, Biaya Penyambungan
                                                Daya PLN Site ITC Cipulir-C01 - CCTV
292    29-Mar-23     MANDIRI      1220011559559 Project DKI                                        1,420,500        1,420,500               -           -             1,420,500

                                                MDT TOTAL SOLUTION, PT, Pembelian Joint
                                                Closure 96 Core 50 Unit, Joint Closure 24
293    30-Mar-23     MANDIRI      1220011559559 Core 20 Unit, Joint Closure 48 Core 30 Pcs        47,508,000       42,800,000         4,708,000         -           47,508,000
                                                SIGMA DAYA RAMADHAN, PT, Tagihan 90%
                                                atas Pekerjaan Penarikan Kabel Udara Final
294    30-Mar-23     MANDIRI      1220011559559 di PT Angkasa Pura Hotel                           6,184,643        5,661,000          622,710       99,067          6,184,643
                                                TADYA MANDIRI SINERGI, PT, Tagihan
                                                Retensi 10% Pekerjaan Penarikan Kabel
                                                Udara Final di Kampung Rawa RW07 -
295    30-Mar-23     MANDIRI      1220011559559 Mushola Al Hikmah                                    547,922          512,077           56,328       20,483            547,922
                                                TADYA MANDIRI SINERGI, PT, Tagihan
                                                Retensi 10% Pekerjaan Penarikan Kabel
                                                Udara Final di Galur RW0304 - Masjid Nurul
296    30-Mar-23     MANDIRI      1220011559559 Ishlah                                               469,706          438,978           48,287       17,559            469,706
                                                TADYA MANDIRI SINERGI, PT, Tagihan
                                                Retensi 10% Pekerjaan Penarikan Kabel
297    30-Mar-23     MANDIRI      1220011559559 Udara Final di Murti Indah Sentosa                 1,352,823        1,264,320          139,075       50,572          1,352,823
                                                TADYA MANDIRI SINERGI, PT, Tagihan
                                                Retensi 10% Pekerjaan Penarikan Kabel
298    30-Mar-23     MANDIRI      1220011559559 Udara Final di DPRD Duren Tiga RW04                  590,830          552,178           60,739       22,087            590,830
                                                TADYA MANDIRI SINERGI, PT, Tagihan
                                                Retensi 10% Pekerjaan Penarikan Kabel
                                                Udara Final di AP CSR DPRD - Kampung
299    30-Mar-23     MANDIRI      1220011559559 Rawa RW01 - Masjid Nurul Aini                        418,774          391,378           43,051       15,655            418,774
                                                TADYA MANDIRI SINERGI, PT, Tagihan
                                                Retensi 10% Pekerjaan Penarikan Kabel
                                                Udara Final di Tanah Tinggi RW07 - Rumah
300    30-Mar-23     MANDIRI      1220011559559 Quran Yulidar                                        464,356          433,978           47,737       17,359            464,356
                                                TADYA MANDIRI SINERGI, PT, Tagihan 90%
                                                atas Pekerjaan Penarikan Kabel Udara Final
                                                Kota Bandung - Kota Bandung Alun Alun
301    30-Mar-23     MANDIRI      1220011559559 Bandung                                            3,618,955        3,382,201          372,042      135,288          3,618,955
                                                TADYA MANDIRI SINERGI, PT, Tagihan
                                                Retensi 10% atas Pekerjaan Penarikan
                                                Kabel Udara Final Kota Bandung - Kota
302    30-Mar-23     MANDIRI      1220011559559 Bandung Alun Alun Bandung                            402,106          375,800           41,338       15,032            402,106
                                                TADYA MANDIRI SINERGI, PT, Tagihan
                                                Retensi 10% atas Pekerjaan Penarikan
                                                Kabel Udara Final as Build Kab.Bantul -
303    30-Mar-23     MANDIRI      1220011559559 Akses Site - Ngestiharjo-009                       2,794,599        2,611,774          287,295      104,470          2,794,599
                                                TADYA MANDIRI SINERGI, PT, Deduction
                                                Material PT Tadya Mandiri Sinergi - 005/BA
304    30-Mar-23     MANDIRI      1220011559559 I-PROJECT/II/2023                          -      12,770,400 -     12,770,400               -           -     -     12,770,400
Page 15
        TANGGAL                     NOMOR
      PENGELUARAN               REKENING BANK
         DI BANK  REKENING BANK      YANG                                                    NILAI MUTASI                       NILAI YANG DIBAYARKAN
NO.    STATEMENT YANG DIGUNAKAN   DIGUNAKAN          NAMA VENDOR DAN KETERANGAN                 BANK             DPP              PPN            PPh        NET DIBAYARKAN

                                                TADYA MANDIRI SINERGI, PT, Tagihan
                                                Retensi 10% Pekerjaan Penarikan Kabel
305    30-Mar-23     MANDIRI      1220011559559 Udara Final di DPRD Cipinang Melayu RW02           700,826         654,978           72,047       26,199           700,826
                                                COMMUNICATION CABLE SYSTEMS
                                                INDONESIA, PT, Uang Muka Beban Umum
                                                atas Pembayaran Cek/Giro Mundur 30 Hari
                                                untuk pengadaan kabel ADSS - PO :
306    31-Mar-23     MANDIRI      1220011559559 1010035412 - Trf                              1,716,841,440   1,546,704,000     170,137,440           -       1,716,841,440
                                                ALPHA CIPTA COMPUTINDO, PT, Pembelian
                                                OTB Indoor 24 Core SC/UPC Full Set 5 Unit,
                                                Cable Network Connector RJ-45 Cat-6 500
                                                Pcs, Power Outlet Strip 6 Port Stop Kontak
307    04-Apr-23    MANDIRI IDR   1220011559559 6 Lubang 20 Unit                                10,783,650       9,715,000         1,068,650          -          10,783,650
                                                ALPHA CIPTA COMPUTINDO, PT, Pembelian
                                                Mikrotik CCR 1036-8G-2S+EM v2 - Mikrotik
308    04-Apr-23    MANDIRI IDR   1220011559559 Sebanyak 2 Unit                                 48,285,000      43,500,000         4,785,000          -          48,285,000
                                                ALPHA CIPTA COMPUTINDO, PT, Pembelian
                                                Mikrotik Router CCR 1036 8G 2S+ untuk
                                                Kebutuhan Jiexpo FTTX Ops Sebanyak 1
309    04-Apr-23    MANDIRI IDR   1220011559559 Unit                                            22,144,500      19,950,000         2,194,500          -          22,144,500
                                                ALPHA CIPTA COMPUTINDO, PT, Pembelian
                                                POE Injector With Adaptor 1 Port 30 W
310    04-Apr-23    MANDIRI IDR   1220011559559 Tenda Sebanyak 60 Unit                          13,986,000      12,600,000         1,386,000          -          13,986,000
                                                MONETI INDO TEKNO, PT, Pembelian Cable
                                                Network STP Cat 6 Belden 1.525 Meter,
                                                Cable Network UTP Cat 6 Belden 6.100
                                                Meter, Cable Network UTP Cat With
311    04-Apr-23    MANDIRI IDR   1220011559559 Connector 3M Sebanyak 30 unit                   80,773,312      72,768,750         8,004,562          -          80,773,312
                                                NOBI PUTRA ANGKASA, PT, Tagihan 100%
                                                atas Pengadaan Pole CCTV Octagonal 10M
312    04-Apr-23    MANDIRI IDR   1220011559559 HDG sebanyak 1 Unit                              6,993,000       6,300,000          693,000           -           6,993,000
                                                KALIABANG JAYA PRATAMA, PT, Tagihan
                                                100% atas Pekerjaan Swap Box Panel &
                                                Mikrotik Jakwifi Site Rawa Terate
                                                RW02,Klender RW04,Kayu Putih
                                                RW15,Rawa Badak Utara RW08 &
                                                RW03,Pegangsaan Dua RW04,Marunda
                                                RW02 & RW01,Kalibaru RW13,Sunter Jaya
313    04-Apr-23    MANDIRI IDR   1220011559559 RW02                                            16,508,206      15,236,000         1,675,960     403,754         16,508,206
                                                MULIA INTIPELANGI, PT, Biaya supervisi
                                                pekerjaan troubleshoot BaliFiber tgl
                                                01022023 di Mall Taman Anggrek (Inv:
314    05-Apr-23    MANDIRI IDR   1220011559559 2023022020)                                        181,800         180,000           19,800       18,000           181,800
                                                MULIA INTIPELANGI, PT, Biaya supervisi
                                                pekerjaan troubleshoot BaliFiber tgl
                                                02022023 di Mall Taman Anggrek (Inv:
315    05-Apr-23    MANDIRI IDR   1220011559559 2023020232)                                         90,900          90,000            9,900        9,000            90,900
                                                MULIA INTIPELANGI, PT, Biaya supervisi
                                                pekerjaan troubleshooting ganguan
                                                intrenet BaliFiber tgl 31 Jan 2023 di Mall
316    05-Apr-23    MANDIRI IDR   1220011559559 Taman Anggrek (Inv: 2023020221)                    181,800         180,000           19,800       18,000           181,800

                                                PLN PERSERO, PT, Biaya Pasang Baru Daya
317    06-Apr-23    MANDIRI IDR   1220011559559 1300VA PLN 30 Titik Project CCTV Bandung        42,645,000      42,645,000               -            -          42,645,000
                                                I NENGAH SUSASTRA, Biaya Pekerjaan
                                                Activation For New Services Corporate
                                                Delivery PT. Idreamland Management
                                                Dunia Baru (The Rich Prada)Upgrade)(PO
                                                Rp.4.130.800,- Potongan PPh 21(2.5%)
318    06-Apr-23   SINARMAS IDR    0002999994 Rp.103.270,- )                                     4,027,530       4,130,800               -       103,270          4,027,530
                                                I NENGAH SUSASTRA, Biaya Pekerjaan
                                                Activation For New Services Corporate
                                                Delivery Smart Media Cellular (PO
                                                Rp.2.407.200,- Potongan PPh 21(2.5%)
319    06-Apr-23   SINARMAS IDR    0002999994 Rp.60.180,- )                                      2,347,020       2,407,200               -        60,180          2,347,020
                                                FURUKAWA OPTICAL SOLUTIONS
                                                INDONESIA, PT, Tagihan 100% atas
                                                Pengadaan Optical Drop Cable 1 Core with
                                                Messanger untuk kebutuhan IKR sebanyak
320    07-Apr-23    MANDIRI IDR   1220011559559 84.000 Mtr                                     195,804,000     176,400,000       19,404,000           -         195,804,000
                                                FURUKAWA OPTICAL SOLUTIONS
                                                INDONESIA, PT, Tagihan 100% atas
                                                Pengadaan Optical Drop Cable 1 Core with
                                                Messanger untuk kebutuhan IKR sebanyak
321    07-Apr-23    MANDIRI IDR   1220011559559 36.000 Mtr                                      83,916,000      75,600,000         8,316,000          -          83,916,000
                                                BANGUN KELOLA SWADAYA, PT, Tagihan
                                                Pelunasan 70% Pekerjaan Penarikan Kabel
                                                FTTH cluster Jatiluhur RW005 (336HP),
                                                Mojo RW008 (339HP) dan Pegadungan
322    10-Apr-23    MANDIRI IDR   1220011559559 RW006 (325HP)                                 2,000,000,000   1,845,869,866   203,045,685.28   48,915,551     2,000,000,000
                                                YANTJE TAMAWIWY, Pekerjaan Activation
                                                For New Services Corporate Delivery PT.
                                                PC24 Telekomunikasi Indonesia (Watson) -
                                                Discovery Shooping Mall (PO Rp.724.000,-
323    11-Apr-23   SINARMAS IDR    0002999994 Potongan PPh 21(2.5%) Rp.18.100,- )                  705,900         724,000               -        18,100           705,900
                                                YANTJE TAMAWIWY, Pekerjaan Activation
                                                For New Services Corporate Delivery PT.
                                                Mitra Pasti Sukses - Discovery Shooping
                                                Mall (PO Rp.1.427.600,- Potongan PPh
324    11-Apr-23   SINARMAS IDR    0002999994 21(2.5%) Rp.35.690,- )                             1,391,910       1,427,600               -        35,690          1,391,910
Page 16
        TANGGAL                     NOMOR
      PENGELUARAN               REKENING BANK
         DI BANK  REKENING BANK      YANG                                                     NILAI MUTASI                       NILAI YANG DIBAYARKAN
NO.    STATEMENT YANG DIGUNAKAN   DIGUNAKAN         NAMA VENDOR DAN KETERANGAN                   BANK             DPP              PPN            PPh        NET DIBAYARKAN
                                                YANTJE TAMAWIWY, Pekerjaan Activation
                                                For New Services Corporate Delivery PT.
                                                PC24 Telekomunikasi Indonesia ? Matahari
                                                (PO Rp.949.200,- Potongan PPh 21(2.5%)
325    11-Apr-23   SINARMAS IDR    0002999994 Rp.23.730,- )                                         925,470         949,200               -        23,730           925,470
                                                BANGUN KELOLA SWADAYA, PT, Tagihan
                                                Pelunasan 70% Penarikan Kabel FTTH
326    11-Apr-23    MANDIRI IDR   1220011559559 sebanyak 11 cluster 3177HP                     3,000,000,000   2,768,804,799   304,568,527.92   73,373,327     3,000,000,000
                                                BANYU MANUNGGAL SEJAHTERA, PT,
                                                Tagihan 90% atas Pekerjaan Penarikan
                                                Kabel Udara Final Kota Bandung -
                                                Diskominfo Kota Bandung (CCTV 55 Titik) -
327    11-Apr-23    MANDIRI IDR   1220011559559 untuk 30 Site                                   150,882,616     139,254,837       15,318,032     3,690,253       150,882,616
                                                KALYANA MITRA LESTARI, PT, Tagihan 90%
                                                atas Pekerjaan Penarikan Kabel Udara Final
                                                Jakarta Timur - Kalbe Farma
328    11-Apr-23    MANDIRI IDR   1220011559559 International_Temporary                          10,726,077       9,817,920         1,079,971     171,814         10,726,077
                                                PLN PERSERO, PT, Biaya Penyambungan
                                                Daya PLN Site Glodok-C02 - CCTV Project
329    12-Apr-23    MANDIRI IDR   1220011559559 DKI                                               1,421,500       1,421,500               -            -           1,421,500
                                                PLN PERSERO, PT, Biaya Penyambungan
330    12-Apr-23    MANDIRI IDR   1220011559559 Daya PLN Site JIS-C01 - CCTV Project DKI          1,421,500       1,421,500               -            -           1,421,500
                                                PLN PERSERO, PT, Biaya Penyambungan
                                                Daya PLN Site Jl. Juanda-C01 - CCTV Project
331    12-Apr-23    MANDIRI IDR   1220011559559 DKI                                               1,421,500       1,421,500               -            -           1,421,500
                                                PLN PERSERO, PT, Biaya Penyambungan
                                                Daya PLN Site Monas-C01 - CCTV Project
332    12-Apr-23    MANDIRI IDR   1220011559559 DKI                                               1,421,500       1,421,500               -            -           1,421,500
                                                PLN PERSERO, PT, Biaya Penyambungan
                                                Daya PLN Site Jl. Tj. Lengkong-C01 - CCTV
333    12-Apr-23    MANDIRI IDR   1220011559559 Project DKI                                       1,421,500       1,421,500               -            -           1,421,500
                                                PLN PERSERO, PT, Biaya Penyambungan
                                                Daya PLN Site Jl. Ps. Timbul Benat-C01 -
334    12-Apr-23    MANDIRI IDR   1220011559559 CCTV Project DKI                                  1,421,500       1,421,500               -            -           1,421,500
                                                PLN PERSERO, PT, Biaya Penyambungan
                                                Daya PLN Site Kota Tua-C01 - CCTV Project
335    12-Apr-23    MANDIRI IDR   1220011559559 DKI                                               1,421,500       1,421,500               -            -           1,421,500
                                                PLN PERSERO, PT, Biaya Penyambungan
                                                Daya PLN Site Kota Tua-C02 - CCTV Project
336    12-Apr-23    MANDIRI IDR   1220011559559 DKI                                               1,421,500       1,421,500               -            -           1,421,500
                                                PLN PERSERO, PT, Biaya Penyambungan
                                                Daya PLN Site Kota Tua-C03 - CCTV Project
337    12-Apr-23    MANDIRI IDR   1220011559559 DKI                                               1,421,500       1,421,500               -            -           1,421,500
                                                PLN PERSERO, PT, Biaya Penyambungan
                                                Daya PLN Site Kota Tua-C04 - CCTV Project
338    12-Apr-23    MANDIRI IDR   1220011559559 DKI                                               1,421,500       1,421,500               -            -           1,421,500
                                                PLN PERSERO, PT, Biaya Penyambungan
                                                Daya PLN Site Kota Tua-C05 - CCTV Project
339    12-Apr-23    MANDIRI IDR   1220011559559 DKI                                               1,421,500       1,421,500               -            -           1,421,500
                                                PLN PERSERO, PT, Biaya Penyambungan
                                                Daya PLN Site Kota Tua-C06 - CCTV Project
340    12-Apr-23    MANDIRI IDR   1220011559559 DKI                                               1,421,500       1,421,500               -            -           1,421,500
                                                PLN PERSERO, PT, Biaya Penyambungan
                                                Daya PLN Site Kota Tua-C07 - CCTV Project
341    12-Apr-23    MANDIRI IDR   1220011559559 DKI                                               1,421,500       1,421,500               -            -           1,421,500
                                                PLN PERSERO, PT, Biaya Penyambungan
                                                Daya PLN Site Kota Tua-C08 - CCTV Project
342    12-Apr-23    MANDIRI IDR   1220011559559 DKI                                               1,421,500       1,421,500               -            -           1,421,500
                                                PLN PERSERO, PT, Biaya Penyambungan
                                                Daya PLN Site Kota Tua-C09 - CCTV Project
343    12-Apr-23    MANDIRI IDR   1220011559559 DKI                                               1,421,500       1,421,500               -            -           1,421,500
                                                PLN PERSERO, PT, Biaya Penyambungan
                                                Daya PLN Site Taman Cilandak-C01 - CCTV
344    12-Apr-23    MANDIRI IDR   1220011559559 Project DKI                                       1,421,500       1,421,500               -            -           1,421,500
                                                PLN PERSERO, PT, Biaya Penyambungan
                                                Daya PLN Site Taman Literasi-C01 - CCTV
345    12-Apr-23    MANDIRI IDR   1220011559559 Project DKI                                       1,421,500       1,421,500               -            -           1,421,500
                                                PLN PERSERO, PT, Biaya Penyambungan
                                                Daya PLN Site Tebet Eco Park-C01 - CCTV
346    12-Apr-23    MANDIRI IDR   1220011559559 Project DKI                                       1,421,500       1,421,500               -            -           1,421,500
                                                PLN PERSERO, PT, Biaya Penyambungan
                                                Daya PLN Site Tebet Eco Park-C02 - CCTV
347    12-Apr-23    MANDIRI IDR   1220011559559 Project DKI                                       1,421,500       1,421,500               -            -           1,421,500
                                                PLN PERSERO, PT, Biaya Penyambungan
                                                Daya PLN Site Tebet Eco Park-C03 - CCTV
348    12-Apr-23    MANDIRI IDR   1220011559559 Project DKI                                       1,421,500       1,421,500               -            -           1,421,500
                                                PLN PERSERO, PT, Biaya Penyambungan
                                                Daya PLN Site Taman Pegangsaan Indah-
349    12-Apr-23    MANDIRI IDR   1220011559559 C01 - CCTV Project DKI                            1,421,500       1,421,500               -            -           1,421,500
                                                PLN PERSERO, PT, Biaya Penyambungan
                                                Daya PLN Site Tebet Eco Park-C04 - CCTV
350    12-Apr-23    MANDIRI IDR   1220011559559 Project DKI                                       1,421,500       1,421,500               -            -           1,421,500
                                                PLN PERSERO, PT, Biaya Penyambungan
                                                Daya PLN Site Jl. Rawajati Barat-C01 - CCTV
351    12-Apr-23    MANDIRI IDR   1220011559559 Project DKI                                       1,421,500       1,421,500               -            -           1,421,500
                                                PLN PERSERO, PT, Biaya Penyambungan
                                                Daya PLN Site Terminal Terpadu
352    12-Apr-23    MANDIRI IDR   1220011559559 Pulogebang-C01 - CCTV Project DKI                 1,421,500       1,421,500               -            -           1,421,500
                                                PLN PERSERO, PT, Biaya Penyambungan
                                                Daya PLN Site Terminal Rawamangun-C01 -
353    12-Apr-23    MANDIRI IDR   1220011559559 CCTV Project DKI                                  1,421,500       1,421,500               -            -           1,421,500
                                                PLN PERSERO, PT, Biaya Penyambungan
                                                Daya PLN Site Tebet Eco Park-C05 - CCTV
354    12-Apr-23    MANDIRI IDR   1220011559559 Project DKI                                       1,421,500       1,421,500               -            -           1,421,500
Page 17
        TANGGAL                     NOMOR
      PENGELUARAN               REKENING BANK
         DI BANK  REKENING BANK      YANG                                                        NILAI MUTASI                       NILAI YANG DIBAYARKAN
NO.    STATEMENT YANG DIGUNAKAN   DIGUNAKAN           NAMA VENDOR DAN KETERANGAN                    BANK             DPP              PPN            PPh        NET DIBAYARKAN
                                                  BANGUN KELOLA SWADAYA, PT, Tagihan
                                                  Pelunasan 70% Penarikan Kabel FTTH
355    13-Apr-23      MANDIRI IDR   1220011559559 sebanyak 11 cluster 3177HP                      1,679,399,142   1,549,976,135   170,497,374.82   41,074,368     1,679,399,142

                                                   DJAJA LISTRIK, PT, Pembelian Joint Closure
                                                   96 Core NWC Sebanyak 5 Pcs, Sandisk Ultra
356    14-Apr-23      MANDIRI IDR    1220011559559 SDHC 16 GB 80 Mbps Sebanyak 1 Pcs                 7,048,500       6,350,000          698,500           -           7,048,500
                                                   BANYU MANUNGGAL SEJAHTERA, PT,
                                                   Tagihan Retensi 10% atas Pekerjaan
                                                   Penarikan Kabel Udara Final Bandung -
                                                   Pintu Masuk dan Pintu Keluar Pendopo(2
357    14-Apr-23      MANDIRI IDR    1220011559559 Titik)                                            1,126,461       1,039,650          114,361       27,550          1,126,461
                                                   CIPTA KARYA TECHNOLOGY, PT, Tagihan
                                                   100% atas Pekerjaan Instalasi Kabel Rumah
358    14-Apr-23      MANDIRI IDR    1220011559559 Batch 22 untuk 60 Sales Order                    14,952,300      13,800,000         1,518,000     365,700         14,952,300
                                                   CIPTA KARYA TECHNOLOGY, PT, Tagihan
                                                   100% atas Pekerjaan Instalasi Kabel Rumah
359    14-Apr-23      MANDIRI IDR    1220011559559 Batch 23 untuk 60 Sales Order                    14,952,300      13,800,000         1,518,000     365,700         14,952,300
                                                   CIPTA KARYA TECHNOLOGY, PT, Tagihan
                                                   100% atas Pekerjaan Instalasi Kabel Rumah
360    14-Apr-23      MANDIRI IDR    1220011559559 Batch 24 untuk 60 Sales Order                    14,952,300      13,800,000         1,518,000     365,700         14,952,300
                                                   CIPTA KARYA TECHNOLOGY, PT, Tagihan
                                                   100% atas Pekerjaan Instalasi Kabel Rumah
361    14-Apr-23      MANDIRI IDR    1220011559559 Batch 25 untuk 60 Sales Order                    14,952,300      13,800,000         1,518,000     365,700         14,952,300
                                                   CIPTA KARYA TECHNOLOGY, PT, Tagihan
                                                   100% atas Pekerjaan Instalasi Kabel Rumah
362    14-Apr-23      MANDIRI IDR    1220011559559 Batch 26 untuk 60 Sales Order                    14,952,300      13,800,000         1,518,000     365,700         14,952,300
                                                   DJAJA LISTRIK, PT, Pembelian BSIDE FWT 81
                                                   Cable Tracker Network Wire Tester LAN
363    14-Apr-23      MANDIRI IDR    1220011559559 Kabe Finder RJ45 Sebanyak 4 Unit                  2,353,200       2,120,000          233,200           -           2,353,200
                                                   FURUKAWA OPTICAL SOLUTIONS
                                                   INDONESIA, PT, Tagihan 100% atas
                                                   Pengadaan Cable Optical Drop SM 1 Core
364    14-Apr-23      MANDIRI IDR    1220011559559 with Mesenger sebanyak 108.000 Mtr              251,748,000     226,800,000       24,948,000           -         251,748,000
                                                   INDONESIA TEKNOLOGI BARU, PT, Tagihan
                                                   90% atas Pekerjaan Penarikan Kabel Udara
                                                   Final DKI Jakarta - PT Biro Klasifikasi
365    14-Apr-23      MANDIRI IDR    1220011559559 Indonesia                                         8,251,494       7,552,854          830,814      132,174          8,251,494
                                                   KALYANA MITRA LESTARI, PT, Tagihan
                                                   Retensi 10% atas Pekerjaan Penarikan
                                                   Kabel Udara Final Jakarta Timur - Kalbe
366    14-Apr-23      MANDIRI IDR    1220011559559 Farma International - Temporary                   1,191,786       1,090,880          119,996       19,090          1,191,786
                                                   KONSTRUKSI BAJA CIKANDE, PT, Tagihan
                                                   100% atas Pengadaan Pole Fiber Optic
367    14-Apr-23      MANDIRI IDR    1220011559559 Round 9M sebanyak 120 Unit                      272,394,000     245,400,000       26,994,000           -         272,394,000
                                                   MONETI INDO TEKNO, PT, Pembelian
                                                   Connector RJ-45 CAT 6 (Commscope)
368    14-Apr-23      MANDIRI IDR    1220011559559 Sebanyak 150 Pcs                                  3,246,750       2,925,000          321,750           -           3,246,750
                                                   MONETI INDO TEKNO, PT, Pembelian OTB
                                                   Rack 24 Core PAZ 1U With Adaptor SC/UPC
369    14-Apr-23      MANDIRI IDR    1220011559559 Sebanyak 40 Pcs                                  35,076,000      31,600,000         3,476,000          -          35,076,000
                                                   MONETI INDO TEKNO, PT, Pembelian Cable
                                                   Ties Steel 68 Cm Stainless Sebanyak 500
                                                   Pcs, Tank Krimping Skun Hydarulic 4-700
370    14-Apr-23      MANDIRI IDR    1220011559559 mm Sebanyak 4 Unit                                3,574,200       3,220,000          354,200           -           3,574,200
                                                   MONETI INDO TEKNO, PT, Pembelian
                                                   Scotch Rubber 3M Super 33+ Sebanyak 50
                                                   Pcs, Pengikat & Perekat Lakban Listrik
371    14-Apr-23      MANDIRI IDR    1220011559559 Scotch 3 M Super 33+ Sebanyak 25 Pcs              3,330,000       3,000,000          330,000           -           3,330,000
                                                   MONETI INDO TEKNO, PT, Pembelian
                                                   Switch Mikrotik Router RB960PGS
372    14-Apr-23      MANDIRI IDR    1220011559559 Sebanyak 10 Unit                                 17,538,000      15,800,000         1,738,000          -          17,538,000
                                                   PRYSMIAN CABLES INDONESIA, PT, Uang
                                                   Muka Beban Umum atas Kebutuhan Giro
                                                   Mundur 180 Hari untuk Pengadaan Kabel
373    14-Apr-23      MANDIRI IDR    1220011559559 ADSS 96 Core - PO : 1010032927 - Trf            255,555,300     230,230,000       25,325,300           -         255,555,300
                                                   PUTERATEL ANDALAN SUKSES, PT, Tagihan
                                                   100% atas Pekerjaan Instalasi Kabel Rumah
374    14-Apr-23      MANDIRI IDR    1220011559559 Batch 26 untuk 78 Sales Order                    19,437,990      17,940,000         1,973,400     475,410         19,437,990
                                                   PUTERATEL ANDALAN SUKSES, PT, Tagihan
                                                   100% atas Pekerjaan Instalasi Kabel Rumah
375    14-Apr-23      MANDIRI IDR    1220011559559 Batch 23 untuk 75 Sales Order                    18,690,375      17,250,000         1,897,500     457,125         18,690,375
                                                   PUTERATEL ANDALAN SUKSES, PT, Tagihan
                                                   100% atas Pekerjaan Instalasi Kabel Rumah
376    14-Apr-23      MANDIRI IDR    1220011559559 Batch 25 untuk 75 Sales Order                    18,690,375      17,250,000         1,897,500     457,125         18,690,375
                                                   PUTERATEL ANDALAN SUKSES, PT, Tagihan
                                                   100% atas Pekerjaan Instalasi Kabel Rumah
377    14-Apr-23      MANDIRI IDR    1220011559559 Batch 24 untuk 75 Sales Order                    18,690,375      17,250,000         1,897,500     457,125         18,690,375
                                                   WAHANA MANDIRI, TOKO, Pembelian
                                                   Visual Fault Locator Range 20 Km Jointwit
                                                   14 Unit, Portable Optical Power Meter Dual
                                                   Port SC F2H Grandway untuk Kebutuhan
378    14-Apr-23      MANDIRI IDR    1220011559559 IKR Project Delivery 3 Unit                      12,887,100      11,610,000         1,277,100          -          12,887,100
                                                   PLN PERSERO, PT, Biaya Penyambungan
                                                   Daya PLN Site Jl. Balai Rakyat-C01 - CCTV
379    14-Apr-23   MANDIRI IDR      1220011559559 Project DKI                                        1,421,500       1,421,500               -            -           1,421,500
                                                   PLN PERSERO, PT, Biaya Penyambungan
                                                   Daya PLN Site Jl. Balap Sepeda-C01 - CCTV
380    14-Apr-23   MANDIRI IDR      1220011559559 Project DKI                                        1,421,500       1,421,500               -            -           1,421,500
                                                   BERGAS PAMUNGKAS, Tagihan 100% atas
                                                   Pekerjaan Pemindahan Tiang site MP
381    14-Apr-23      MANDIRI IDR    1220011559559 Cipedak-001                                       2,040,686       2,206,147               -       165,461          2,040,686
                                                   BERGAS PAMUNGKAS, Tagihan 100% atas
                                                   Pekerjaan Perbaikan Hasil Patroli Kabel dan
382    14-Apr-23      MANDIRI IDR    1220011559559 Tiang Miring site Kapuk-009                       3,416,346       3,693,347               -       277,001          3,416,346
Page 18
        TANGGAL                     NOMOR
      PENGELUARAN               REKENING BANK
         DI BANK  REKENING BANK      YANG                                                   NILAI MUTASI                       NILAI YANG DIBAYARKAN
NO.    STATEMENT YANG DIGUNAKAN   DIGUNAKAN         NAMA VENDOR DAN KETERANGAN                 BANK             DPP              PPN            PPh        NET DIBAYARKAN
                                                MULIA INTIPELANGI, PT, Biaya supervisi
                                                atas pekerjaan troubleshoot BaliFiber tgl
383    17-Apr-23    MANDIRI IDR   1220011559559 21/3/23 di MTA (Inv: 2023030584)                   90,900          90,000            9,900        9,000            90,900
                                                MULIA INTIPELANGI, PT, Biaya Supervisi
                                                Pekerjaan Penarikan Kabel atas Tenant PT.
                                                Karada Indonesia Satu di Gedung Mall
                                                Taman Anggrek (Inv: 2023020525 &
384    17-Apr-23    MANDIRI IDR   1220011559559 2023020521)                                       727,200         720,000           79,200       72,000           727,200
                                                TOKOPEDIA, PT, Biaya Pembelian Poe
                                                Injector Untuk Kebutuhan Dept Access
385    17-Apr-23    MANDIRI IDR   1220011559559 Point sebanyak 2 unit                           4,530,540       4,530,540               -            -           4,530,540
                                                YANTJE TAMAWIWY, Biaya pekerjaan
                                                Activation For New Services Corporate
                                                Delivery PT. Aura Cantik Retailindo (PO
                                                Rp.782.000,- Potongan PPh 21(2.5%)
386    18-Apr-23   SINARMAS IDR    0002999994 Rp.762.450,-)                                       762,450         782,000               -        19,550           762,450
                                                ALPHA CIPTA COMPUTINDO, PT, Pembelian
                                                Cable Network UTP Cat 5E Sebanyak 915
387    26-Apr-23    MANDIRI IDR   1220011559559 MTR                                             4,895,100       4,410,000          485,100           -           4,895,100
                                                ALPHA CIPTA COMPUTINDO, PT, Pembelian
                                                Cable Networks STP Cat 5E untuk
                                                Kebutuhan Project CCTV 343 Sebanyak
388    26-Apr-23    MANDIRI IDR   1220011559559 3.965 MTR                                      36,002,850      32,435,000         3,567,850          -          36,002,850

                                                ASIA TELCO NETWORKS, PT, Pembelian
                                                Patchcord SM Simplex LC/APC-SC/APC
                                                2MM 1.5M 125 Unit, Patchcord SM Simplex
389    26-Apr-23    MANDIRI IDR   1220011559559 LC/UPC-SC/APC 2MM 1.5M 6 Unit, dll              6,870,456       6,189,600          680,856           -           6,870,456
                                                ASIA TELCO NETWORKS, PT, Pembelian
                                                Adapter FC/UPC 15 Pcs, Adapter LC/UPC 40
                                                Pcs, Adapter SC/APC 900 Pcs, Adapter
                                                SC/UPC 20 Pcs, Adaptor SC/UPC 60 Pcs,
390    26-Apr-23    MANDIRI IDR   1220011559559 Adaptor LC/APC 60 Pcs                           1,443,955       1,300,860          143,095           -           1,443,955
                                                AURORA MULIA SAMBARU, PT, Tagihan
                                                100% atas Pekerjaan Instalasi Kabel Rumah
391    26-Apr-23    MANDIRI IDR   1220011559559 Batch 08 untuk 80 Sales Order                  26,176,300      23,960,000         2,635,600     419,300         26,176,300
                                                AURORA MULIA SAMBARU, PT, Tagihan
                                                100% atas Pekerjaan Instalasi Kabel Rumah
392    26-Apr-23    MANDIRI IDR   1220011559559 Batch 09 untuk 79 Sales Order                  23,521,525      21,530,000         2,368,300     376,775         23,521,525
                                                BANGUN KELOLA SWADAYA, PT, Tagihan
                                                Pelunasan 70% Penarikan Kabel FTTH
393    26-Apr-23    MANDIRI IDR   1220011559559 sebanyak 11 cluster 3177HP                   2,000,000,000   1,845,869,866   203,045,685.28   48,915,551     2,000,000,000
                                                BERCA HARDAYAPERKASA, PT, Pembelian
                                                Router L3MPLS CCR1036-8G 2S EM
394    26-Apr-23    MANDIRI IDR   1220011559559 Mikrotik Snapdragon Sebanyak 5 Unit           126,534,450     113,995,000       12,539,450           -         126,534,450
                                                BERCA HARDAYAPERKASA, PT, Pembelian
                                                CCTV DS-2DE4225IW DE T5 Hikvision
395    26-Apr-23    MANDIRI IDR   1220011559559 Sebanyak 3 Unit                                15,980,670      14,397,000         1,583,670          -          15,980,670
                                                BERGAS PAMUNGKAS, Tagihan 100% atas
                                                Pekerjaan Penarikan kabel FO Cut Impact
                                                Tertabrak Truck site PT Central Creative
396    26-Apr-23    MANDIRI IDR   1220011559559 Solution (Graha Sentana)                        1,911,926       2,066,947               -       155,021          1,911,926
                                                BERGAS PAMUNGKAS, Tagihan 100% atas
                                                Pekerjaan Penarikan kabel FO Cut Impact
                                                Tertabrak Truck site PT Qlue Performa
397    26-Apr-23    MANDIRI IDR   1220011559559 Indonesia                                       1,686,966       1,823,747               -       136,781          1,686,966
                                                DIAN MUSTIKA AGUNG, PT, Pembelian
                                                Cable Power NYAF 10 MM Black Supreme
                                                200 MTR, Cable Power NYAF 10 MM RED
                                                200 MTR, Cable NYAF 10MM Yellow
398    26-Apr-23    MANDIRI IDR   1220011559559 Supreme 200 MTR                                15,984,000      14,400,000         1,584,000          -          15,984,000
                                                INDOKARYA SUKSES BERSAMA, PT, Biaya
                                                Jasa Penarikan dan Supervisi Batch 6
                                                sebanyak 25 SO di Apartement Casablanca
399    26-Apr-23    MANDIRI IDR   1220011559559 East Residences II                              6,874,988       7,638,875               -       763,887          6,874,988
                                                INFRA YES SOLUSINDO, PT, Jasa Penarikan
                                                dan Supervisi 12 SO Batch 34 di
400    26-Apr-23    MANDIRI IDR   1220011559559 Apartement Green Pramuka                        4,116,000       4,200,000               -        84,000          4,116,000
                                                INFRA YES SOLUSINDO, PT, Jasa Penarikan
                                                dan Supervisi 12 SO Batch 33 di
401    26-Apr-23    MANDIRI IDR   1220011559559 Apartement Green Pramuka                        4,116,000       4,200,000               -        84,000          4,116,000
                                                INFRA YES SOLUSINDO, PT, Jasa Penarikan
                                                dan Supervisi 12 SO Batch 36 di
402    26-Apr-23    MANDIRI IDR   1220011559559 Apartement Green Pramuka                        4,116,000       4,200,000               -        84,000          4,116,000
                                                INFRA YES SOLUSINDO, PT, Jasa Penarikan
                                                dan Supervisi 12 SO Batch 35 di
403    26-Apr-23    MANDIRI IDR   1220011559559 Apartement Green Pramuka                        4,116,000       4,200,000               -        84,000          4,116,000
                                                MDT TOTAL SOLUTION, PT, Pembelian Joint
                                                Closure 24 Core Sebanyak 30 Unit, Joint
                                                Closure 48 Core 30 Pcs, Joint Closure 96
404    26-Apr-23    MANDIRI IDR   1220011559559 Core Sebanyak 50 Unit                          50,616,000      45,600,000         5,016,000          -          50,616,000
                                                MDT TOTAL SOLUTION, PT, Pembelian Joint
                                                Closure 96 core Untuk Kebutuhan Stock
                                                Tower Operation Q4 Batch 02 2022 40 Unit,
                                                Joint Closure 48 Core Untuk Kebutuhan
                                                Stock Tower Operation Q4 Batch 02 2022
405    26-Apr-23    MANDIRI IDR   1220011559559 30 Unit                                        34,965,000      31,500,000         3,465,000          -          34,965,000
                                                MONETI INDO TEKNO, PT, Pembelian Tas
                                                Kerja Mekanik Tool Sebanyak 10 Unit,
                                                Rubber Speed Bump Heavy Duty 1 Meter -
                                                OsanO Polisi Tidur Tools 12 A Sebanyak 20
406    26-Apr-23    MANDIRI IDR   1220011559559 Unit                                           33,688,500      30,350,000         3,338,500          -          33,688,500
Page 19
        TANGGAL                     NOMOR
      PENGELUARAN               REKENING BANK
         DI BANK  REKENING BANK      YANG                                                      NILAI MUTASI                  NILAI YANG DIBAYARKAN
NO.    STATEMENT YANG DIGUNAKAN   DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                 BANK          DPP            PPN            PPh       NET DIBAYARKAN
                                                  MONETI INDO TEKNO, PT, Pembelian Racor
                                                  Filter Catride Type 1000 FG ukuran 30
                                                  Micro 4 Pcs, Reducer 1 Inch x 1/2 Inch
407    26-Apr-23      MANDIRI IDR   1220011559559 Stainless Steel 4 Pcs, dll                       3,577,530     3,223,000      354,530           -           3,577,530
                                                  MONETI INDO TEKNO, PT, Pembelian
                                                  Telescopic Ladeder L 4.4 Meter Sebanyak 6
408    26-Apr-23      MANDIRI IDR   1220011559559 Unit                                            10,589,400     9,540,000     1,049,400          -          10,589,400
                                                  MONETI INDO TEKNO, PT, Pembelian Kabel
                                                  Ties Nylon 30 Cm Hitam 5 Pak, Kabel Ties
                                                  Nylon Putih 5 Pak, Radio Walkie Talkie HT
409    26-Apr-23      MANDIRI IDR   1220011559559 Alinco 3 Set, dll                                4,240,200     3,820,000      420,200           -           4,240,200

                                                  NOKIA SOLUTIONS and NETWORK
                                                  INDONESIA, PT, DP 10% atas Pengadaan
                                                  ONT GPON 1GE SC/APC sebanyak 2.540Pcs
                                                  dan Nokia Wifi Beacon Dual Band AX1800
410    26-Apr-23      MANDIRI IDR   1220011559559 2XGE sebanyak 2.540 Unit - PPN                  31,705,054           -      31,705,054          -          31,705,054
                                                  NOKIA SOLUTIONS and NETWORK
                                                  INDONESIA, PT, DP 10% atas Pengadaan
                                                  ONT GPON 1GE SC/APC sebanyak 2.540Pcs
                                                  dan Nokia Wifi Beacon Dual Band AX1800
411    26-Apr-23      MANDIRI IDR   1220011559559 2XGE sebanyak 2.540 Unit                       288,227,770   288,227,770           -            -         288,227,770
                                                  TELCO ABADI JAYA, PT, Pembelian Rossette
                                                  8 Core SC/UPC With Adaptor With Pigtail
412    26-Apr-23      MANDIRI IDR   1220011559559 Sebanyak 50 Pcs                                  7,215,000     6,500,000      715,000           -           7,215,000

                                                  TELCO ABADI JAYA, PT, Pembelian Cable
                                                  Network Connector RJ-45 Cat 5E Sebanyak
                                                  1.500 Unit, Rossette 8 Core SC/UPC With
413    26-Apr-23      MANDIRI IDR   1220011559559 Adaptor With Pigtail Sebanyak 40 Pcs             9,934,500     8,950,000      984,500           -           9,934,500
                                                  ALPHA CIPTA COMPUTINDO, PT, Pembelian
                                                  Cable Networks Coaxial RG-8 Untuk
                                                  Kebutuhan Pekerjaan Reroute Link MW
414    26-Apr-23      MANDIRI IDR   1220011559559 Sebanyak 915 MTR                                44,455,500    40,050,000     4,405,500          -          44,455,500

                                                   TELCO ABADI JAYA, PT, Pembelian OTB
415    26-Apr-23      MANDIRI IDR    1220011559559 Indoor 2U 48 Core SC/UPC Sebanyak 2 Unit        5,072,700     4,570,000      502,700           -           5,072,700
                                                   BERGAS PAMUNGKAS, Tagihan 100% atas
                                                   Pekerjaan Pemindahan Box FAT-01-015
                                                   Cluster Cipinang Jaya site MP Cipinang
416    26-Apr-23      MANDIRI IDR    1220011559559 Besar Selatan-002                               1,118,461     1,209,147           -         90,686         1,118,461
                                                   BERGAS PAMUNGKAS, Tagihan 100% atas
                                                   Pekerjaan Perbaikan Tiang Miring dan
                                                   pemindahan Tiang Komplain Pihak
                                                   Kelurahan Jl. Pangeran Antasari site MCP
417    26-Apr-23      MANDIRI IDR    1220011559559 Cipete Utara-008                                2,299,686     2,486,147           -        186,461         2,299,686
                                                   BERGAS PAMUNGKAS, Tagihan 100% atas
                                                   Pekerjaan Penarikan kabel FO Cut Impact
418    26-Apr-23   MANDIRI IDR      1220011559559 Tertabrak Truck site MP Suka Pura-001            1,917,846     2,073,347           -        155,501         1,917,846
                                                   BERGAS PAMUNGKAS, Tagihan 100% atas
                                                   Pekerjaan Penarikan Kabel FO Cut Impact
419    26-Apr-23   MANDIRI IDR      1220011559559 Pembangunan Jalan Toll site Cinere-014           2,789,751     3,015,947           -        226,196         2,789,751
                                                   BERGAS PAMUNGKAS, Tagihan 100% atas
                                                   Pekerjaan Penarikan kabel FO Cut Impact
420    26-Apr-23   MANDIRI IDR      1220011559559 Tertabrak Truck site MP Kalideres-001            1,618,886     1,750,147           -        131,261         1,618,886

                                                  BERGAS PAMUNGKAS, Tagihan 100% atas
                                                  Pekerjaan Penarikan kabel FO Cut Impact
421    26-Apr-23   MANDIRI IDR      1220011559559 Tertabrak Truck site MP Cilandak Timur-002       1,725,446     1,865,347           -        139,901         1,725,446
                                                  BERGAS PAMUNGKAS, Tagihan 100% atas
                                                  Pekerjaan Penarikan Kabel FO Cut Impact
                                                  Kebakaran Konsleting Listrik site MP Pasar
422    26-Apr-23   MANDIRI IDR      1220011559559 Minggu-001                                       1,725,446     1,865,347           -        139,901         1,725,446

                                                  PLANET TECHNOLOGY CORPORATION,
                                                  Uang Muka Beban Umum atas Pembayaran
                                                  Pengadaan Switch Planet IGS-4215-8P2T2S
                                                  untuk Kebutuhan Project CCTV 343 [264
423    28-Apr-23     SINARMAS USD    0000670707 Unit] - PO : 1010035575 - Trf                    967,217,856   967,217,856           -            -         967,217,856
                                                  BIBIT, Mr, Pekerjaan Perbaikan FO Cut
                                                  Feeder Cluster Puri Nusa Dua dan Kabel
                                                  distribusi Cluster Taman Mumbul yang
                                                  terbakar karena arus pendek listrik (PO
                                                  Rp.4.404.505,- Potongan PPh 21(3%)
424    02-May-23     SINARMAS IDR    0002999994 Rp.132.135,- )                                     4,272,370     4,404,505           -        132,135         4,272,370
                                                  CIPTA SEDAYU ELEKTRINDO, PT, Tagihan
                                                  100% atas Pekerjaan Pengadaan Sertifikat
425    02-May-23      MANDIRI IDR   1220011559559 Laik Operasi & NIDI 10 Site                      2,384,375     2,187,500      240,625        43,750         2,384,375
                                                  CIPTA SEDAYU ELEKTRINDO, PT, Tagihan
                                                  100% atas Pekerjaan Pengadaan Sertifikat
426    02-May-23      MANDIRI IDR   1220011559559 Laik Operasi & NIDI 10 Site                      2,384,375     2,187,500      240,625        43,750         2,384,375
                                                  CIPTA SEDAYU ELEKTRINDO, PT, Tagihan
                                                  100% atas Pekerjaan Pengadaan Sertifikat
427    02-May-23      MANDIRI IDR   1220011559559 Laik Operasi & NIDI 10 Site                      2,384,375     2,187,500      240,625        43,750         2,384,375
                                                  CIPTA SEDAYU ELEKTRINDO, PT, Tagihan
                                                  100% atas Pekerjaan Pengadaan Sertifikat
428    02-May-23      MANDIRI IDR   1220011559559 Laik Operasi & NIDI 14 Site                      3,338,125     3,062,500      336,875        61,250         3,338,125
                                                  BERGAS PAMUNGKAS, Tagihan 100% atas
                                                  Pekerjaan Penarikan Kabel FO Cut Impact
429    04-May-23      MANDIRI IDR   1220011559559 Tertabrak Truck site Duri Kepa-022               1,587,066     1,715,747           -        128,681         1,587,066

                                                  BERGAS PAMUNGKAS, Tagihan 100% atas
                                                  Pekerjaan Perbaikan Hasil Patroli Kampung
430    04-May-23      MANDIRI IDR   1220011559559 Rambutan RW06 site MP Rambutan-001               1,215,586     1,314,147           -         98,561         1,215,586
Page 20

          
Page 21
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan MCP

         TANGGAL        REKENING       NOMOR                                                                                       NILAI YANG DIBAYARKAN
       PENGELUARAN     BANK YANG    REKENING BANK                                                                                                                NET
NO.       DI BANK      DIGUNAKAN        YANG            NAMA VENDOR DAN KETERANGAN                NILAI MUTASI BANK   DPP            PPN           PPh       DIBAYARKAN

                                                   HERY SETYAWAN SLAMET - Tagihan 100%
                                                   atas Pekerjaan Install/Upgrade Daya PLN
  1      22-Dec-22      MANDIRI      1220011559559 site 730836 Ngertiharjo-009 - Kab. Bantul             25,837,500   26,500,000           -       662,500     25,837,500
                                                   IMAM TAUFIK, Pemindahan jalur FO Link
                                                   Site_01 Labuan Sait to Site_10 Pura
                                                   Selonding terkait comcase di pantai
  2      21-Dec-22      SINARMAS      00002999994 Suluban                                                 1,343,787    1,385,347           -        41,560      1,343,787

                                                   PLN PERSERO, PT - Biaya Penyambungan
                                                   Daya PLN Site Kota Baru-006 Priority
  3      22-Dec-22      MANDIRI      1220011559559 Smartfren- MCP Project                                14,982,300   14,982,300           -             -     14,982,300
                                                   YUYUN MUNADHI - Tagihan 100% atas
                                                   Pekerjaan Peninggian Hand Hole Jalur site
  4      22-Dec-22      MANDIRI      1220011559559 Jagalan-009                                            1,504,919    1,543,506           -        38,587      1,504,919

                                                   SITAC CELLULAR - Uang Muka Beban
                                                   Umum atas Biaya kontribusi lingkungan
                                                   jalur feeder cluster Dukuh Kupang RW02
  5      22-Dec-22      MANDIRI      1220011559559 wilayah Surabaya - PR : 5010008001 - Trf               1,000,000    1,000,000           -             -      1,000,000

                                                   KALIABANG JAYA PRATAMA, PT - Tagihan
                                                   100% atas Relokasi 1 Pekerjaan ME
                                                   Grounding & Accessories Telematika
  6      23-Dec-22      MANDIRI      1220011559559 Tiang Beton 14/900 Site Klego-003                     16,303,643   15,047,202     1,655,192     398,751     16,303,643

                                                     KALIABANG JAYA PRATAMA, PT - Tagihan
                                                     100% atas Relokasi 1 Pekerjaan ME
                                                     Grounding & Accessories Telematika
  7      23-Dec-22      MANDIRI      1220011559559   Tiang Beton 14/900 Site Klego-003                   17,020,279   15,708,610     1,727,947     416,278     17,020,279
                                                     SYMMETRY CONTRACTING INDONESIA,
                                                     PT - Tagihan 100% atas Pekerjaan Instalasi
                                                     Tiang & ME Grounding Pole Steel
  8      23-Dec-22      MANDIRI      1220011559559   Octagonal 21 M Site Keputih-026                     32,232,230   29,748,251     3,272,308     788,329     32,232,230
                                                     ASIA TELCO NETWORKS, PT, Pembelian
                                                     pengadaan SFP 100G QSFP 10 km untuk
                                                     Kebutuhan Stock Tower Operation
  9      23-Dec-22      MANDIRI      1220011559559   Sebanyak 4 Unit                                       582,750      525,000        57,750            -        582,750
                                                     MONETI INDO TEKNO, PT, Pembelian
 10      23-Dec-22      MANDIRI      1220011559559   Cable Network                                       11,100,000   10,000,000     1,100,000           -     11,100,000
                                                     MONETI INDO TEKNO, PT, Pembelian
 11      23-Dec-22      MANDIRI      1220011559559   Cable Network                                        8,103,000    7,300,000      803,000            -      8,103,000
                                                     MONETI INDO TEKNO, PT, Pembelian
 12      23-Dec-22      MANDIRI      1220011559559   Cable Network                                        2,464,200    2,220,000      244,200            -      2,464,200
                                                     MONETI INDO TEKNO, PT, Pembelian
 13      23-Dec-22      MANDIRI      1220011559559   Cable Network                                       10,350,750    9,325,000     1,025,750           -     10,350,750
                                                     MONETI INDO TEKNO, PT, Pembelian
 14      23-Dec-22      MANDIRI      1220011559559   Cable Network                                        5,061,600    4,560,000      501,600            -      5,061,600
                                                     ASIA TELCO NETWORKS, PT, Pembelian
                                                     pengadaan SFP 100G QSFP 10 km untuk
                                                     Kebutuhan Stock Tower Operation
 15      23-Dec-22      MANDIRI      1220011559559   Sebanyak 4 Unit                                     51,948,000   46,800,000     5,148,000           -     51,948,000
                                                     ASIA TELCO NETWORKS, PT, Pembelian
                                                     pengadaan SFP 100G QSFP 10 km untuk
                                                     Kebutuhan Stock Tower Operation
 16      23-Dec-22      MANDIRI      1220011559559   Sebanyak 4 Unit                                     31,746,000   28,600,000     3,146,000           -     31,746,000
                                                     ASIA TELCO NETWORKS, PT, Pembelian
                                                     pengadaan SFP 100G QSFP 10 km untuk
                                                     Kebutuhan Stock Tower Operation
 17      23-Dec-22      MANDIRI      1220011559559   Sebanyak 4 Unit                                     18,644,825   16,797,140     1,847,685           -     18,644,825
                                                     AURORA MULIA SAMBARU, PT, Tagihan
                                                     Retensi 10% atas Pekerjaan Penarikan
                                                     Kabel FO Final as Build Kab.Tangerang -
 18      23-Dec-22      MANDIRI      1220011559559   Akses Site - Cluster Suka Bakti-004                 24,344,116   22,751,510     2,502,666     910,060     24,344,116
                                                     AURORA MULIA SAMBARU, PT, Tagihan
                                                     Retensi 10% atas Pekerjaan Penarikan
                                                     Kabel FO Final as Build Kab.Tangerang -
 19      23-Dec-22      MANDIRI      1220011559559   Akses Site - Cluster Suka Bakti-004                  3,431,846    3,207,333      352,806      128,293      3,431,846
                                                     RAJA AMERTHA DEWATA, PT, Biaya
                                                     Pekerjaan FTTB 816697 DP3AP2KB -
                                                     DINAS KOMUNIKASI DAN INFORMATIKA
 20      27-Dec-22      SINARMAS      00002999994    KABUPATEN GIANYAR                                    3,012,753    2,780,575      305,863       73,685      3,012,753
                                                     RAJA AMERTHA DEWATA, PT, Biaya
                                                     Pekerjaan FTTB 816704 Dinas Sosial -
                                                     DINAS KOMUNIKASI DAN INFORMATIKA
 21      27-Dec-22      SINARMAS      00002999994    KABUPATEN GIANYAR                                    2,794,970    2,579,576      283,753       68,359      2,794,970
                                                     RAJA AMERTHA DEWATA, PT, Biaya
                                                     Pekerjaan FTTB 816701 Dinas Pariwisata -
                                                     DINAS KOMUNIKASI DAN INFORMATIKA
 22      27-Dec-22      SINARMAS      00002999994    KABUPATEN GIANYAR                                    5,876,444    5,423,576      596,593      143,725      5,876,444
                                                     RAJA AMERTHA DEWATA, PT, Biaya
                                                     Pekerjaan FTTB 816699 Badan
                                                     Kesbangpol - DINAS KOMUNIKASI DAN
 23      27-Dec-22      SINARMAS      00002999994    INFORMATIKA KABUPATEN GIANYAR                        2,872,982    2,651,576      291,673       70,267      2,872,982

                                                   WHIDIA BHARAYA, PT, Jasa Soil Test site
 24      28-Dec-22      MANDIRI      1220011559559 Bunulrejo-001 MP 26M Malang Jatim                      4,200,000    4,000,000      440,000      240,000      4,200,000
Page 22
        TANGGAL      REKENING      NOMOR                                                                                       NILAI YANG DIBAYARKAN
      PENGELUARAN   BANK YANG   REKENING BANK                                                                                                                 NET
NO.      DI BANK    DIGUNAKAN       YANG           NAMA VENDOR DAN KETERANGAN            NILAI MUTASI BANK        DPP            PPN           PPh        DIBAYARKAN
                                                PUSAT PENGELOLAAN KOMPLEK
                                                KEMAYORAN, Sewa Lahan untuk
                                                Penempatan BTS Hotel sebanyak 26 Titik
                                                di Kawasan Komplek Kemayoran periode
25     29-Dec-22     MANDIRI    1220011559559   01 Nov 2022 - 31 Okt 2023                        952,382,000    858,002,000     94,380,000           -     952,382,000
                                                DUTA HITA JAYA, PT, DP 30% atas
                                                Pengadaan Temporary Tower Support MP
26      03-Jan-23    MANDIRI    1220011559559   30M 3 System sebanyak 2 Set - PPN                    725,335             -        725,335            -         725,335
                                                KESA UTAMA SEJAHTERA, PT, Biaya
                                                Pembuatan Pondasi dan Pemindahan
                                                perangkat di Site M_11 Villa Lumbung (PO
                                                Rp.15.468.052,- PPN Rp.1.532.870,-
27      03-Jan-23    MANDIRI    1220011559559   Potongan PPh 4(2) 4% Rp.557.407,- )               14,910,645     13,935,182      1,532,870     557,407      14,910,645
                                                KESA UTAMA SEJAHTERA, PT, Biaya
                                                Pembuatan Pondasi dan Pemindahan
                                                perangkat di Site M_11 Villa Lumbung (PO
                                                Rp.15.468.052,- PPN Rp.1.532.870,-
28      03-Jan-23    MANDIRI    1220011559559   Potongan PPh 4(2) 4% Rp.557.407,- )               89,249,890     83,411,112      9,175,222    3,336,444     89,249,890
                                                ZTE INDONESIA, PT, DP 10% Battery
                                                Lithium 48V 100AH ZXDC48 FB100B3 ZTE
29      03-Jan-23    MANDIRI    1220011559559   Batch-2 sebanyak 1000 unit                     1,741,545,000   1,741,545,000           -             -    1,741,545,000
                                                ZTE INDONESIA, PT, DP 10% Battery
                                                Lithium 48V 100AH ZXDC48 FB100B3 ZTE
30      03-Jan-23    MANDIRI    1220011559559   Batch-2 sebanyak 1000 unit                       191,569,950             -     191,569,950           -     191,569,950

                                              BERCA HARDAYAPERKASA, PT, Pembelian
                                              Adaptor CCTV 12 V 2 Ampere 5 Pcs, Box
                                              Sekering 1 Pcs, TP-Link TL-SF 1005D
31      03-Jan-23    MANDIRI    1220011559559 Switch Hub 5 Port 1 Pcs, dll                        4,910,640       4,424,000       486,640            -       4,910,640
                                              BERCA HARDAYAPERKASA, PT, Pembelian
                                              Switch Mikrotik RB960PGS - hEX-PoE
32      03-Jan-23    MANDIRI    1220011559559 Sebanyak 10 Unit                                   14,820,720      13,352,000      1,468,720           -      14,820,720

                                              BERCA HARDAYAPERKASA, PT, Pembelian
                                              Wsitch Mikrotik RB 960 PGS (hEX-PoE)
33      03-Jan-23    MANDIRI    1220011559559 Sebanyak 10 UnitTP-Link TL-SF                      14,820,720      13,352,000      1,468,720           -      14,820,720
                                              HANDASA KONSULTAN, PT, DP 40%
                                              untuk PO 2010008418 Pekerjaan
                                              Pengurusan SLF 13 Site di Kabupaten
34      03-Jan-23    MANDIRI    1220011559559 Badung dan Gianyar                                 57,200,000      57,200,000            -             -      57,200,000
                                              GIGA DATACOM, PT, Tagihan 100% atas
                                              Pekerjaan Penarikan Kabel FO Final as
                                              Build Jakarta Barat - Akses Site - Grogol
35      03-Jan-23    MANDIRI    1220011559559 Utara-034                                          26,485,918      24,243,404      2,666,774     424,260      26,485,918

                                                MALAKA KARYA UTAMA, PT, Tagihan
                                                Retensi 10% atas Pekerjaan Penarikan
                                                Kabel FO Final as Build Jakarta Selatan -
36      03-Jan-23    MANDIRI    1220011559559   Akses Site - Kahfi POI ISAT (Proteksi Link)       3,995,702       3,687,773       405,655       97,726       3,995,702
                                                REKAYASA TECHNOLOGY PERSADA, PT,
                                                Tagihan 90% atas Pekerjaan Penarikan
                                                Kabel FO Final as Build Kota Bekasi - Akses
37      03-Jan-23    MANDIRI    1220011559559   Site - Jatisampurna-010                         145,821,445     134,583,705     14,804,208    3,566,468    145,821,445
                                                IWAN SOFYAN, Tagihan 100% atas
                                                Pekerjaan Perbaikan Tiang FO Link MP
38      03-Jan-23    MANDIRI    1220011559559   Larangan-008 Cirebon                                706,875         725,000            -        18,125         706,875
                                                IWAN SOFYAN, Tagihan 100% atas
                                                Pekerjaan Perbaikan Tiang FO Link MP
39      03-Jan-23    MANDIRI    1220011559559   Larangan-008 Cirebon                                706,875         725,000            -        18,125         706,875
                                                IWAN SOFYAN, Tagihan 100% atas
                                                Pekerjaan Perbaikan Tiang FO Link MP
40      03-Jan-23    MANDIRI    1220011559559   Larangan-008 Cirebon                                706,875         725,000            -        18,125         706,875
                                                TADYA MANDIRI SINERGI, PT, Tagihan
                                                100% atas Pekerjaan Penarikan Kabel FO
                                                as Build Kota Semarang - Akses Site -
41      05-Jan-23    MANDIRI    1220011559559   Karangtempel-001                                 23,425,333      21,892,835      2,408,211     875,713      23,425,333
                                                IMAM TAUFIK, Biaya pekerjaan perbaikan
                                                FO Cut TT.H1106-002 FO Link BLL_16 to
                                                BLL_08 Jln Raya Bedugul Singaraja desa
42      06-Jan-23   SINARMAS     0002999994     Pegayaman                                         2,138,850       2,205,000            -        66,150       2,138,850
                                                IMAM TAUFIK, Biaya pekerjaan perbaikan
                                                FO Cut TT.H1030-002 FO Link S05 to S05
                                                Jln Bypass Ngurah Rai - Jimbaran
43      06-Jan-23   SINARMAS     0002999994                                                         868,150         895,000            -        26,850         868,150
                                                IMAM TAUFIK, Biaya pekerjaan perbaikan
                                                verticality P7_27 Link Site_16 to Site_13
44      06-Jan-23   SINARMAS     0002999994     Jln. Raya Uluwatu                                770,128.59         793,947            -        23,818         770,129
                                                IMAM TAUFIK, Biaya Perbaikan Verticality
                                                pole P7_48 FO link S41 to S02 dan
                                                pengamanan HDPE Jln Bypass Ngurah Rai
45      06-Jan-23   SINARMAS     0002999994                                                       1,512,567       1,559,347            -        46,780       1,512,567
                                                IMAM TAUFIK, Biaya pekerjaan perbaikan
                                                FO Cut TT.H1101-010-FO link BLL_16 to
                                                BLL_08 Jln Raya Gitgit - Sukasada
46      06-Jan-23   SINARMAS     0002999994                                                       2,773,424       2,859,200            -        85,776       2,773,424
                                                IMAM TAUFIK, Biaya Pekerjaan Perbaikan
                                                Kabel dan Tiang FO Miring site M_90
                                                dampak Tertimpa pohon Jln. Uluwatu
47      06-Jan-23   SINARMAS     0002999994     Jimbaran                                          1,152,619       1,188,267            -        35,648       1,152,619
Page 23
        TANGGAL      REKENING      NOMOR                                                                                     NILAI YANG DIBAYARKAN
      PENGELUARAN   BANK YANG   REKENING BANK                                                                                                               NET
NO.      DI BANK    DIGUNAKAN       YANG           NAMA VENDOR DAN KETERANGAN              NILAI MUTASI BANK    DPP            PPN           PPh        DIBAYARKAN
                                                IMAM TAUFIK, Biaya pekerjaan perbaikan
                                                kabel FO link site_31 to BLL_08 sec1
                                                P7_207 tertimpa pohon di Jln Luwus
48      06-Jan-23   SINARMAS     0002999994     Tabanan                                            1,633,079     1,683,587           -        50,508       1,633,079
                                                IMAM TAUFIK, Biaya pekerjaan relokasi
                                                pole FO Akses BLL_02 Banjar Tegal
                                                Selatan impact rehabilitasi Jln Banyupoh -
49      06-Jan-23    MANDIRI     0002999994     Kerta kawat Singaraja                              5,034,288     5,189,988           -       155,700       5,034,288

                                                ALPHA CIPTA COMPUTINDO, PT,
                                                Pembelian Radio R5AC Lite Ubiquiti
                                                Rocket 5AC 10 Unit, Rocket Dish 5G 30dBi
                                                Light Weight RD 5G30-LW 10 Unit, Router
50      09-Jan-23    MANDIRI    1220011559559   Wireless 300 MBPS 5 Unit, dll                    39,862,875     35,912,500     3,950,375           -      39,862,875
                                                NOBI PUTRA ANGKASA, PT, Tagihan 100%
                                                atas Pengadaan ODC 64U Rack 19 Inch
                                                sebanyak 5 Unit dan Modular ACPDB
51      09-Jan-23    MANDIRI    1220011559559   DCPDB 3 Phase sebanyak 5 Unit                    26,640,000     24,000,000     2,640,000           -      26,640,000
                                                NOBI PUTRA ANGKASA, PT, Tagihan 100%
                                                atas Pengadaan ODC 64U Rack 19 Inch
                                                sebanyak 5 Unit dan Modular ACPDB
52      09-Jan-23    MANDIRI    1220011559559   DCPDB 3 Phase sebanyak 5 Unit                       643,800       580,000        63,800            -         643,800
                                                NOBI PUTRA ANGKASA, PT, Tagihan 100%
                                                atas Pengadaan ODC 64U Rack 19 Inch
                                                sebanyak 5 Unit dan Modular ACPDB
53      09-Jan-23    MANDIRI    1220011559559   DCPDB 3 Phase sebanyak 5 Unit                   218,670,000    197,000,000    21,670,000           -     218,670,000
                                                TELCO ABADI JAYA, CV, Pembelian
                                                Patchcord SM Duplex SC/APC-SC/UPC
                                                2MM 3M Sebanyak 10 Unit, Patchcord
                                                SM Duplex LC/UPC-SC/IPC 2MM 3M
                                                Sebanyak 20 Unit, Poe Injector With
54      09-Jan-23    MANDIRI    1220011559559   Adaptor 1 Port 30W Sebanyak 40 Unit              11,643,900     10,490,000     1,153,900           -      11,643,900
                                                TELCO ABADI JAYA, CV, Pembelian
                                                Patchcord SM Simplex FC/UPC 3MM 3M
55      09-Jan-23    MANDIRI    1220011559559   Sebanyak 30 Unit                                    566,100       510,000        56,100            -         566,100
                                                BANYU MANUNGGAL SEJAHTERA, PT,
                                                Tagihan 100% atas Pekerjaan ME
                                                Grounding & Accessories Telematika
                                                Tiang Beton 14/900 Site Pisangan Timur-
56      09-Jan-23    MANDIRI    1220011559559   014                                              18,928,054     17,469,362     1,921,630     462,938      18,928,054

                                              BANYU MANUNGGAL SEJAHTERA, PT,
                                              Tagihan 100% atas Relokasi 2 Pekerjaan
                                              ME Grounding & Accessories Telematika
57      09-Jan-23    MANDIRI    1220011559559 Tiang Beton 14/900 Site Marga Jaya-008             19,448,134     17,949,362     1,974,430     475,658      19,448,134

                                              BANYU MANUNGGAL SEJAHTERA, PT,
                                              Tagihan 100% atas Pekerjaan ME
                                              Grounding & Accessories Telematika
                                              Tiang Beton 14/900 (12 + 9 M Extension)
58      09-Jan-23    MANDIRI    1220011559559 + Strengthening Site Sumur Batu-006                17,778,903     16,408,770     1,804,965     434,832      17,778,903
                                              BANYU MANUNGGAL SEJAHTERA, PT,
                                              Tagihan 100% atas Pekerjaan Dismantle
                                              ME Telematika & Accessories Telamatika
59      09-Jan-23    MANDIRI    1220011559559 14/900 Site Cisarua-008                             8,209,734      7,577,050      833,476      200,792       8,209,734
                                              KALIABANG JAYA PRATAMA, PT, Tagihan
                                              100% atas Pekerjaan Rektifikasi HH05
60      09-Jan-23    MANDIRI    1220011559559 Jalur Bangilan-003 Pasuruan                         5,525,850      5,100,000      561,000      135,150       5,525,850

                                              KALIABANG JAYA PRATAMA, PT, Tagihan
                                              100% atas Relokasi 1 (Dismantle & Re-
                                              Install) Perangkat Tenant Pole Octagonal
61      09-Jan-23    MANDIRI    1220011559559 21 M Site Sunter Agung-023                         22,641,095     20,896,258     2,298,588     553,751      22,641,095

                                              KALIABANG JAYA PRATAMA, PT, Tagihan
                                              100% atas Relokasi 1 (Dismantle & Re-
                                              Install) Perangkat Tenant Pole Beton
62      09-Jan-23    MANDIRI    1220011559559 14/900 daN Site Gambir-027                          9,064,825      8,366,244      920,286      221,705       9,064,825
                                              SYMMETRY CONTRACTING INDONESIA,
                                              PT, Tagihan 100% atas Addwork
                                              Pekerjaan Instalasi Monopole 21 M
                                              (Modifikasi Monopole Octagonal 26 M)
63      09-Jan-23    MANDIRI    1220011559559 Site Keputih-026                                    1,515,655      1,398,851      153,874       37,070       1,515,655
                                              SYMMETRY CONTRACTING INDONESIA,
                                              PT, Tagihan 100% atas Pekerjaan Instalasi
                                              Monopole Oktagonal 26 M Site
64      09-Jan-23    MANDIRI    1220011559559 Kedungturi-005                                     38,514,428     35,546,311     3,910,094     941,977      38,514,428

                                              SYMMETRY CONTRACTING INDONESIA,
                                              PT, Tagihan 100% atas Addwork
                                              Pekerjaan Instalasi Mini Tower 16 M -
65      09-Jan-23    MANDIRI    1220011559559 Tower Triangle Rooftop Site Buduran-001             1,083,500      1,000,000      110,000       26,500       1,083,500

                                              KALIABANG JAYA PRATAMA, PT, Tagihan
66      09-Jan-23    MANDIRI    1220011559559 100% atas Pekerjaan Penarikan Kabel FO             15,101,996     13,938,160     1,533,197     369,361      15,101,996

                                              KALIABANG JAYA PRATAMA, PT, Tagihan
67      09-Jan-23    MANDIRI    1220011559559 100% atas Pekerjaan Penarikan Kabel FO             14,443,163     13,330,100     1,466,311     353,248      14,443,163
                                              CIRCLECOM NUSANTARA INDONESIA, PT,
                                              Sewa Lahan di Kawasan Pantai Indah
68      11-Jan-23    MANDIRI    1220011559559 Kapuk site Kapuk Muara-043                        181,800,000    180,000,000    19,800,000   18,000,000    181,800,000
Page 24
        TANGGAL      REKENING      NOMOR                                                                                        NILAI YANG DIBAYARKAN
      PENGELUARAN   BANK YANG   REKENING BANK                                                                                                                 NET
NO.      DI BANK    DIGUNAKAN       YANG           NAMA VENDOR DAN KETERANGAN                NILAI MUTASI BANK     DPP            PPN           PPh       DIBAYARKAN
                                                JASA KELISTRIKAN INDONESIA, PT, Biaya
                                                SLO dan NIDI persyaratan registrasi
                                                penyambungan baru di Gardu Bali
69      12-Jan-23   SINARMAS     0002999994     Collection                                           2,817,500      2,875,000           -        57,500      2,817,500
                                                DUTA HITA JAYA, PT, Pelunasan 70%
                                                Pengadaan Commy Body Pole, Ring
                                                Mounting, Bordest 1 dan Bordest 2,
                                                Anchor M24 dan Accessories MP36
70      17-Jan-23    MANDIRI    1220011559559   sebanyak 1set                                      240,941,476    240,941,476           -             -    240,941,476
                                                HUME SAKTI INDONESIA, PT, Tagihan
                                                100% atas Pekerjaan Instalasi Tiang
                                                Sementara Beton 13/350 Sementara Site
71      17-Jan-23    MANDIRI    1220011559559   Sukasari-003                                         2,996,000      2,800,000      308,000      112,000      2,996,000
                                                HUME SAKTI INDONESIA, PT, Pekerjaan
72      17-Jan-23    MANDIRI    1220011559559   Instalasi Tiang Telematika Beton                       (37,800)       74,200            -       112,000        (37,800)
                                                HUME SAKTI INDONESIA, PT, Tagihan
                                                100% atas Pekerjaan Instalasi Tiang
                                                Sementara Beton 13/350 Sementara Site
73      17-Jan-23    MANDIRI    1220011559559   Sukasari-003                                         2,996,000      2,800,000      308,000      112,000      2,996,000
                                                HUME SAKTI INDONESIA, PT, Tagihan
                                                100% atas Pekejaan Dismantle Tiang
                                                Beton Telematika 14/900 Site Pondok
74      17-Jan-23    MANDIRI    1220011559559   Bambu-013                                            9,073,600      8,480,000      848,000      254,400      9,073,600
                                                HUME SAKTI INDONESIA, PT, Tagihan
                                                100% atas Pekerjaan Dismantle Tiang
                                                Beton Telematika 14/900 Site Pasar Baru-
75      17-Jan-23    MANDIRI    1220011559559   001                                                  9,073,600      8,480,000      848,000      254,400      9,073,600
                                                HUME SAKTI INDONESIA, PT, Tagihan
                                                100% atas Pekerjaan Dismantle Tiang
                                                Beton Telematika - 14/900 Site Lubang
76      17-Jan-23    MANDIRI    1220011559559   Buaya-006                                            9,073,600      8,480,000      848,000      254,400      9,073,600

                                                HUME SAKTI INDONESIA, PT, Tagihan
                                                100% atas Paket Pekerjaan Installasi Tiang
77      17-Jan-23    MANDIRI    1220011559559   Beton site Randusari Pasuruan-002                    7,313,450      6,835,000      683,500      205,050      7,313,450
                                                HUME SAKTI INDONESIA, PT, Tagihan
                                                100% atas Paket Pekerjaan Installasi Tiang
78      17-Jan-23    MANDIRI    1220011559559   Beton site Purworejo-001                             7,313,450      6,835,000      683,500      205,050      7,313,450
                                                HUME SAKTI INDONESIA, PT, Tagihan
                                                100% atas Paket Pekerjaan Installasi Tiang
79      17-Jan-23    MANDIRI    1220011559559   Beton site Kepuh Kiriman-003                         7,313,450      6,835,000      683,500      205,050      7,313,450
                                                HUME SAKTI INDONESIA, PT, Tagihan
                                                100% atas Paket Pekerjaan Installasi Tiang
80      17-Jan-23    MANDIRI    1220011559559   Beton site Banjarkemantren-003                       7,313,450      6,835,000      683,500      205,050      7,313,450
                                                HUME SAKTI INDONESIA, PT, Tagihan
                                                100% atas Paket Pekerjaan Installasi Tiang
81      17-Jan-23    MANDIRI    1220011559559   Beton site Wadungasri-002                            7,313,450      6,835,000      683,500      205,050      7,313,450
                                                HUME SAKTI INDONESIA, PT, Tagihan
                                                100% atas Pekerjaan Dismantle Tiang
                                                Beton Telematika - 14/900 Site
82      17-Jan-23    MANDIRI    1220011559559   Cengkareng Timur-029                                 9,073,600      8,480,000      848,000      254,400      9,073,600
                                                HUME SAKTI INDONESIA, PT, Tagihan
                                                100% atas Pekerjaan Dismantle Tiang
                                                Beton Telematika - 14/900 Site Bangka-
83      17-Jan-23    MANDIRI    1220011559559   027                                                  9,073,600      8,480,000      848,000      254,400      9,073,600
                                                HUME SAKTI INDONESIA, PT, Tagihan
                                                100% atas Paket Pekerjaan Installasi Tiang
84      17-Jan-23    MANDIRI    1220011559559   Beton site Tanjung Priuk-004                         7,313,450      6,835,000      683,500      205,050      7,313,450
                                                HUME SAKTI INDONESIA, PT, Tagihan
                                                100% atas Paket Pekerjaan Installasi Tiang
85      17-Jan-23    MANDIRI    1220011559559   Beton site Jatinegara Kaum-001                       7,313,450      6,835,000      683,500      205,050      7,313,450
                                                HUME SAKTI INDONESIA, PT, Tagihan
                                                100% atas Paket Pekerjaan Installasi Tiang
86      17-Jan-23    MANDIRI    1220011559559   Beton site Pancoran-001                              7,313,450      6,835,000      683,500      205,050      7,313,450
                                                HUME SAKTI INDONESIA, PT, Tagihan
                                                100% atas Paket Pekerjaan Installasi Tiang
87      17-Jan-23    MANDIRI    1220011559559   Beton site Kedoya Utara-005                          7,313,450      6,835,000      683,500      205,050      7,313,450
                                                HUME SAKTI INDONESIA, PT, Tagihan
                                                100% atas Paket Pekerjaan Installasi Tiang
88      17-Jan-23    MANDIRI    1220011559559   Beton site Meruya Utara-009                          7,313,450      6,835,000      683,500      205,050      7,313,450
                                                HUME SAKTI INDONESIA, PT, Tagihan
                                                100% atas Paket Pekerjaan Installasi Tiang
89      17-Jan-23    MANDIRI    1220011559559   Beton site Srengseng-017                             7,313,450      6,835,000      683,500      205,050      7,313,450
                                                HUME SAKTI INDONESIA, PT, Tagihan
                                                100% atas Paket Pekerjaan Installasi Tiang
90      17-Jan-23    MANDIRI    1220011559559   Beton site Pasar Minggu-018                          7,313,450      6,835,000      683,500      205,050      7,313,450
                                                HUME SAKTI INDONESIA, PT, Tagihan
                                                100% atas Paket Pekerjaan Installasi Tiang
91      17-Jan-23    MANDIRI    1220011559559   Beton site Pegangsaan Dua-075                        7,313,450      6,835,000      683,500      205,050      7,313,450
                                                RAJA AMERTHA DEWATA, PT, Tagihan
                                                90% Pekerjaan FTTB 816696 Dinas
                                                Perhubungan - DINAS KOMUNIKASI DAN
                                                INFORMATIKA KABUPATEN GIANYAR
92      18-Jan-23    MANDIRI    1220011559559                                                       27,939,778     25,786,597     2,836,526     683,345     27,939,778
                                                RAJA AMERTHA DEWATA, PT, Tagihan
                                                90% Pekerjaan FTTB 816696 Dinas
                                                Perhubungan - DINAS KOMUNIKASI DAN
                                                INFORMATIKA KABUPATEN GIANYAR
93      18-Jan-23    MANDIRI    1220011559559                                                       14,930,630     13,780,000     1,515,800     365,170     14,930,630
Page 25
        TANGGAL      REKENING      NOMOR                                                                                        NILAI YANG DIBAYARKAN
      PENGELUARAN   BANK YANG   REKENING BANK                                                                                                                  NET
NO.      DI BANK    DIGUNAKAN       YANG           NAMA VENDOR DAN KETERANGAN             NILAI MUTASI BANK        DPP            PPN           PPh        DIBAYARKAN
                                                CIPTABUANA TRANS ABADI, PT, Tagihan
                                                100% Paket Pekerjaan FO Network
94      24-Jan-23    MANDIRI    1220011559559   Optimization 24.165m                            2,299,742,435   2,105,027,400   231,553,014   36,837,979   2,299,742,435
                                                CAKRAWALA ENERGI NUSANTARA, PT,
95      24-Jan-23    MANDIRI    1220011559559   Penarikan Kabel FO Final                           52,745,181     49,294,563      5,422,401    1,971,783     52,745,181
                                                CAKRAWALA ENERGI NUSANTARA, PT,
96      24-Jan-23    MANDIRI    1220011559559   Penarikan Kabel FO Final                           68,156,806     63,697,950      7,006,774    2,547,918     68,156,806
                                                BALAI BESAR PELAKSANAAN JALAN
                                                NASIONAL VIII, Uang Muka Beban Umum
                                                atas Pengajuan Sewa Lahan untuk Proyek
                                                Link Fo Ruas Jalan Nasional Beringkit
97      25-Jan-23    MANDIRI    1220011559559   selama 3 Tahun                                     96,840,000     96,840,000            -             -      96,840,000
                                                BIBIT, Mr, Biaya Pekerjaan Relokasi Pole
                                                P7_79 Link FO DPS_02 to MCP
                                                Sukawati_002 Jln. WR Supratman
98      26-Jan-23   SINARMAS     0002999994     Denpasar, Bali)                                     1,020,195      1,051,747            -        31,552       1,020,195
                                                CIPTABUANA TRANS ABADI, PT, Tagihan
                                                100% Paket Pekerjaan FO Network
99      26-Jan-23    MANDIRI    1220011559559   Optimization 22.588m                            2,142,793,972   1,961,367,479   215,750,423   34,323,930   2,142,793,972
                                                RAJA AMERTHA DEWATA, PT, Biaya
                                                penarikan kabel pekerjaan Activation for
                                                New Service Corporate Delivery -816702
                                                Inspectorat -Dinas Komunikasi dan
100     26-Jan-23   SINARMAS     0002999994     Informatika Kabupaten Gianyar                       4,812,447      4,441,576       488,573      117,702       4,812,447
                                                RAJA AMERTHA DEWATA, PT, Biaya
                                                penarikan kabel pekerjaan Activation for
                                                New Service Corporate Delivery -816698
                                                Satpol PP-Dinas Komunikasi dan
101     26-Jan-23   SINARMAS     0002999994     Informatika Kabupaten Gianyar                       2,610,775      2,409,576       265,053       63,854       2,610,775
                                                RAJA AMERTHA DEWATA, PT, Biaya
                                                penarikan kabel pekerjaan Activation for
                                                New Service Corporate Delivery -816700
                                                DPRD-Dinas Komunikasi dan Informatika
102     26-Jan-23   SINARMAS     0002999994     Kabupaten Gianyar                                   2,737,544      2,526,575       277,923       66,954       2,737,544
                                                TOWER OPERATION, Uang Muka Beban
                                                Umum atas FPU Biaya Normalisasi
                                                Pemasangan KWH Impact KWH Stolen-
103     30-Jan-23    MANDIRI    1220011559559   Hilang Site 701420 Papango-016 - Trf                  607,381        607,381            -             -         607,381
                                                SITAC CELLULAR, Biaya Akuisisi (Sewa)
                                                Lahan Tahun Kedua Site Cipinang Melayu-
104     31-Jan-23    MANDIRI    1220011559559   007                                                27,735,000     27,735,000            -             -      27,735,000
                                                SYMMETRY CONTRACTING INDONESIA,
                                                PT, Tagihan 100% atas Pekerjaan Instalasi
                                                Mini Tower 16 M - Tower Triangle
105     31-Jan-23    MANDIRI    1220011559559   Rooftop Site Buduran-001                           78,781,594     72,710,286      7,998,131    1,926,823     78,781,594
                                                MEDIA FIROPTIX NUSANTARA, PT,
                                                Tagihan Retensi 10% atas Pekerjaan
                                                Penarikan Kabel Tanam & Udara FO 24
106     31-Jan-23    MANDIRI    1220011559559   Core - MCP Denpasar Section 2                      22,482,424     21,011,611      2,311,277     840,464      22,482,424

                                                MONDIAL TEKNOLOGI INDONESIA, PT,
                                                Tagihan 100% atas Pekerjaan Penarikan
                                                Relokasi Kabel FO Non SJUT (Relokasi FO) -
107     31-Jan-23    MANDIRI    1220011559559   Relokasi Jl. Raya Condet - Jl. Dewi Sartika      18,812,377       17,362,600      1,909,886     460,109      18,812,377
                                                DOVANEGA REKATAMA CIPTA, PT,
                                                Tagihan Term II & III 70% atas Paket
                                                Pekerjaan Fiber Optic - Cluster Veteran
108     31-Jan-23    MANDIRI    1220011559559   MP Kota Surakarta                                56,267,202       52,586,170      5,784,479    2,103,447     56,267,202
                                                JASA KELISTRIKAN INDONESIA, PT,
                                                Pegurusan NIDI dan SLO Daya 7700 VA
                                                untuk Site 751032 Legian-002 dan Site
109    02-Feb-23    SINARMAS     00002999994    751096 Kerobokan-004                               1,372,000       1,400,000            -        28,000       1,372,000
                                                MDT TOTAL SOLUTION, PT, Biaya
                                                pembelian patchord SM Simplex 2MM
110    02-Feb-23    SINARMAS     00002999994    dan Duplex 3MM                                      810,300          730,000        80,300            -         810,300
                                                DUTA HITA JAYA, PT, DP 30% atas
                                                Pengadaan Steel Pole 21M sebanyak 10
111    02-Feb-23     MANDIRI    1220011559559   Set                                             335,652,001      335,652,001            -             -     335,652,001
                                                BERGAS PAMUNGKAS, Tagihan 100% atas
                                                Pekerjaan Penarikan Tiang FO dan Kabel
                                                Landai Site Jovis SF Batch 7 Site MP-
112    03-Feb-23     MANDIRI    1220011559559   Bangka-001                                         2,172,053       2,227,747            -        55,694       2,172,053
                                                BERGAS PAMUNGKAS, Tagihan 100% atas
                                                Pekerjaan Penarikan Tiang FO dan Kabel
                                                Landai Site Jovis SF Batch 7 Site MP-
113    03-Feb-23     MANDIRI    1220011559559   Bangka-001                                         1,930,254       1,979,747            -        49,493       1,930,254

                                              PEMERINTAH PROVINSI BANTEN, Uang
                                              Muka Beban Umum atas Biaya Retribusi
                                              Pemanfaatan Tanah Milik Pemerintah
                                              Daerah Provinsi Banten untuk
114    03-Feb-23     MANDIRI    1220011559559 Pemasangan Utilitas Tahun 2022-2023                59,450,000       59,450,000            -             -      59,450,000
                                              SANTA MULTI SEMESTA, PT, Tagihan
                                              100% atas Pekerjaan Install Tiang FO 9mtr
                                              Crossing Road dan Perbaikan Kabel Landai
115    03-Feb-23     MANDIRI    1220011559559 Site Cilodong-010                                  12,566,744       11,744,621      1,291,908     469,785      12,566,744
                                              SANTA MULTI SEMESTA, PT, Tagihan
                                              100% atas Pekerjaan Rektifikasi Jalur
                                              Permanent FOC Link Bacep - Cideng
116    03-Feb-23     MANDIRI    1220011559559 Impact Proyek SDA Site MP-Cideng-002                 5,610,742       5,243,684       576,805      209,747       5,610,742
Page 26
        TANGGAL      REKENING      NOMOR                                                                                       NILAI YANG DIBAYARKAN
      PENGELUARAN   BANK YANG   REKENING BANK                                                                                                                NET
NO.      DI BANK    DIGUNAKAN       YANG         NAMA VENDOR DAN KETERANGAN                   NILAI MUTASI BANK   DPP            PPN           PPh       DIBAYARKAN
                                              SANTA MULTI SEMESTA, PT, Tagihan
                                              100% atas Pekerjaan Pemasangan Tiang
                                              FO Crossing dan Perbaikan Kabel Landai
117    03-Feb-23     MANDIRI    1220011559559 Site Lebak Bulus-005                                   12,768,546   11,933,221     1,312,654     477,329     12,768,546
                                              SANTA MULTI SEMESTA, PT, Tagihan
                                              100% atas Pekerjaan Pemasangan Tiang
                                              FO dan Perbaikan Kabel Landai Site
118    03-Feb-23     MANDIRI    1220011559559 Sepanjang Jaya-003                                      3,975,568    3,715,484      408,703      148,619      3,975,568
                                              SANTA MULTI SEMESTA, PT, Tagihan
                                              100% atas Pekerjaan Penarikan Kabel FO
119    03-Feb-23     MANDIRI    1220011559559 Bending Site Babat-004                                  2,745,282    2,565,684      282,225      102,627      2,745,282

                                                SANTA MULTI SEMESTA, PT, Tagihan
                                                100% atas Pekerjaan Pemasangan Tiang
                                                FO 9mtr Crossing Road dan Perbaikan
120    03-Feb-23     MANDIRI    1220011559559   Kabel FO Site MP-Duri Kosambi-001                    18,911,844   17,674,621     1,944,208     706,985     18,911,844
                                                SANTA MULTI SEMESTA, PT, Tagihan
                                                100% atas Pekerjaan Dismantle Kabel dan
                                                Tiang FO Relokasi Jl.Antara - Pasar Baru
121    03-Feb-23     MANDIRI    1220011559559   Site Pasar Baru-003                                   4,988,216    4,661,884      512,807      186,475      4,988,216
                                                SANTA MULTI SEMESTA, PT,Tagihan 100%
                                                atas Pekerjaan Perbaikan Kabel FO dan
                                                Pemasangan Accessories Site Jovis Batch
122    03-Feb-23     MANDIRI    1220011559559   7 Site MP-Kebon Jeruk-001                            10,233,074    9,563,621     1,051,998     382,545     10,233,074
                                                SANTA MULTI SEMESTA, PT, Tagihan
                                                100% atas Pekerjaan Perbaikan Tiang FO
                                                dan Kabel Landai Cluster Rorotan - Roa
123    03-Feb-23     MANDIRI    1220011559559   Malaka Site MP-Suka Pura-001                         12,157,362   11,362,021     1,249,822     454,481     12,157,362

                                              SANTA MULTI SEMESTA, PT, Tagihan
                                              100% atas Pekerjaan Pembuatan Hand
                                              Hole (HH) Concrete Impact Pembangunan
124    03-Feb-23     MANDIRI    1220011559559 Trotoar Site Pegangsaan-005                             7,247,842    6,773,684      745,105      270,947      7,247,842

                                                SANTA MULTI SEMESTA, PT, Tagihan
                                                100% atas Pekerjaan Perbaikan Kabel FO
                                                dan Pemasangan Accessories Site Jovis
125    03-Feb-23     MANDIRI    1220011559559   Batch 7 Site MP-Cempaka Baru-001                      5,313,496    4,965,884      546,247      198,635      5,313,496
                                                PLN PERSERO, PT, Biaya Penyambungan
                                                Daya PLN Site Kerobokan-004 - Project
126    07-Feb-23     MANDIRI    1220011559559   Bali                                                  8,745,300    8,745,300           -             -      8,745,300
                                                PLN PERSERO, PT, Biaya Penyambungan
127    07-Feb-23     MANDIRI    1220011559559   Daya PLN Site Legian-002 - Project Bali               8,745,300    8,745,300           -             -      8,745,300
                                                TOWER OPERATION, Uang Muka Beban
                                                Umum atas Biaya Upgrade PLN Site
                                                Roomo-003 & Sekarkurung-002 Region
128    07-Feb-23     MANDIRI    1220011559559   Jawa Timur - PR : 1010032014 - Trf                   12,879,000   12,879,000           -             -     12,879,000
                                                DJAJA LISTRIK, PT, Pembelian Accu Genset
                                                N70Z 12V Biasa 6 Unit, Swaden KWH
                                                Digital 1 Phase D1M 125 Series Smartfren
                                                10 Pcs, Adaptor CCTV 12 Vdc 2 Amp 15
129    08-Feb-23     MANDIRI    1220011559559   Unit                                                 16,372,500   14,750,000     1,622,500           -     16,372,500
                                                MONETI INDO TEKNO, PT, Pembelian
                                                Material Bangun List Siku Aluminium 5
130    08-Feb-23     MANDIRI    1220011559559   Btg, Plat Talang Zincalum 10 Mtr, dll                 8,694,630    7,833,000      861,630            -      8,694,630
                                                KALIABANG JAYA PRATAMA, PT, Tagihan
                                                100% atas Relokasi 1 Pekerjaan Civil Work
                                                Telematika Tiang Beton 14/900 Site
131    08-Feb-23     MANDIRI    1220011559559   Gambir-027                                           16,980,036   15,671,469     1,723,861     415,294     16,980,036
                                                KALIABANG JAYA PRATAMA, PT, Tagihan
                                                100% atas Relokasi 1 Pekerjaan Civil Work
                                                Telematika Tiang Beton 14/900 Site
132    08-Feb-23     MANDIRI    1220011559559   Gambir-027                                            1,874,983    1,730,488      190,353       45,858      1,874,983

                                                KALIABANG JAYA PRATAMA, PT, Tagihan
                                                100% atas Pekerjaan Instalasi Asesoris
133    08-Feb-23     MANDIRI    1220011559559   dan CCTV Pole 21 M Site Pucangsawit-003               1,857,728    1,714,563      188,601       45,436      1,857,728
                                                KALIABANG JAYA PRATAMA, PT, Tagihan
                                                100% atas Relokasi 1 Pekerjaan Civil Work
                                                Telematika Tiang Beton 14/900 Site
134    08-Feb-23     MANDIRI    1220011559559   Gambir-027                                           16,980,036   15,671,469     1,723,861     415,294     16,980,036
                                                KALIABANG JAYA PRATAMA, PT, Tagihan
                                                100% atas Relokasi 1 Pekerjaan Civil Work
                                                Telematika Tiang Beton 14/900 Site
135    08-Feb-23     MANDIRI    1220011559559   Maphar-002                                           16,980,036   15,671,469     1,723,861     415,294     16,980,036
                                                KALIABANG JAYA PRATAMA, PT, Tagihan
                                                100% atas Pekerjaan Penarikan Kabel FO
                                                Final as Build Jakarta Timur - Akses Site -
136    08-Feb-23     MANDIRI    1220011559559   Pondok Ranggon-004                                   12,219,063   11,277,400     1,240,514     298,851     12,219,063
                                                KALIABANG JAYA PRATAMA, PT, Tagihan
                                                100% atas Pekerjaan Penarikan Kabel FO
                                                Final as Build Jakarta Timur - Akses Site -
137    08-Feb-23     MANDIRI    1220011559559   Klender-008                                          11,662,794   10,764,000     1,184,040     285,246     11,662,794
                                                KALIABANG JAYA PRATAMA, PT, Tagihan
                                                100% atas Pekerjaan Penarikan Kabel FO
                                                Final as Build Kota Bekasi - Akses Site -
138    08-Feb-23     MANDIRI    1220011559559   OLT Kota Baru-006                                     6,758,223    6,237,400      686,114      165,291      6,758,223
Page 27
        TANGGAL      REKENING      NOMOR                                                                                        NILAI YANG DIBAYARKAN
      PENGELUARAN   BANK YANG   REKENING BANK                                                                                                                  NET
NO.      DI BANK    DIGUNAKAN       YANG           NAMA VENDOR DAN KETERANGAN                 NILAI MUTASI BANK    DPP            PPN           PPh        DIBAYARKAN

                                                KALIABANG JAYA PRATAMA, PT, Tagihan
                                                100% atas Pekerjaan Penarikan Kabel FO
                                                Final as Build Jakarta Timur - Akses Site -
139    08-Feb-23     MANDIRI    1220011559559   Proteksi OLT Lubang Buaya-006                        10,216,538     9,429,200     1,037,212     249,874      10,216,538
                                                KALIABANG JAYA PRATAMA, PT, Tagihan
                                                100% atas Pekerjaan Penarikan Kabel FO
                                                Final as Build Kota Bandung - Akses Site
                                                RK0004 - Office Bandung - (Relokasi FO
                                                KU ke KT Jl Ir H Juanda (Crossing
140    08-Feb-23     MANDIRI    1220011559559   Cikapayang))                                          2,304,349     2,126,764      233,944       56,359       2,304,349
                                                NOBI PUTRA ANGKASA, PT, Tagihan 100%
                                                atas Pengadaan ODC 64U Rack 19" dan
                                                Modular ACPDB DCPDB 3 Phase masing-
141    08-Feb-23     MANDIRI    1220011559559   masing sebanyak 4 Unit                              174,936,000   157,600,000    17,336,000           -     174,936,000
                                                DJAJA LISTRIK, PT, Pembelian CCTV 2MP
                                                PTZ Solar Panel Camera Wistino Sebanyak
142    08-Feb-23     MANDIRI    1220011559559   10 Unit                                              36,075,000    32,500,000     3,575,000           -      36,075,000
                                                CAKRAWALA ENERGI NUSANTARA, PT,
                                                Tagihan 90% atas Pekerjaan Penarikan
                                                Kabel FO Final as Build Kab.Tangerang -
143    08-Feb-23     MANDIRI    1220011559559   Akses Site - Teluk Naga-004                          69,235,037    64,705,643     7,117,620    2,588,226     69,235,037
                                                BALAI BESAR PELAKSANAAN JALAN
                                                NASIONAL DKI JAKARTA - JAWA BARAT,
                                                Uang Muka Beban Umum atas Biaya Sewa
                                                Lahan Site Batuceper-001 (BPJN) Kota
                                                Tangerang Tahun 2022-2027 - PR :
144    09-Feb-23     MANDIRI    1220011559559   1010031937 - Trf                                     54,500,000    54,500,000           -             -      54,500,000
                                                DUTA HITA JAYA, PT, Tagihan Pelunasan
                                                70% atas Pengadaan Monopole 21M Steel
145    09-Feb-23     MANDIRI    1220011559559   sebanyak 5 Set                                      378,629,244   378,629,244           -             -     378,629,244
                                                POLA REKAYASA UTAMA, PT, Jasa
                                                Analysis Foundation Monopole 26M site
146    09-Feb-23     MANDIRI    1220011559559   Bunulrejo-001                                         1,612,500     1,500,000      165,000       52,500       1,612,500
                                                TOWER OPERATION, Uang Muka Beban
                                                Umum atas FPU Biaya UJL
                                                Migrasi&Upgrade Daya KWH Prabayar ke
                                                Pascabayar Batch 1 (2023) Site Gelora-
147    09-Feb-23     MANDIRI    1220011559559   006 & Bangka-014 - Trf                                8,946,400     8,946,400           -             -       8,946,400
                                                BINTANG MAS UTAMA, CV, Pembelian
                                                Tang Ampere fluke untuk penggantian
                                                kerusakan Milik team Buleleng dan
                                                Pembelian Kontactor ATS Genset untuk
148    14-Feb-23     MANDIRI    1220011559559   disite 07 kampial                                     9,490,500     8,550,000      940,500            -       9,490,500
                                                TELCO ABADI JAYA, CV, Pembelian SFP
                                                FTLX1471D3BNL 10 GB 1310NM DDm LC
149    14-Feb-23     MANDIRI    1220011559559   10KM Sebanyak 4 Unit                                  3,441,000     3,100,000      341,000            -       3,441,000
                                                TELCO ABADI JAYA, CV, Pembelian
                                                Patchcord SM Simplex SC/UPC-SC/UPC
                                                2MM 3M Sebanyak 30 Unit, Pigtail SM
                                                SC/APC 1M Patchcord Untuk TS FDT/OTB
150    14-Feb-23     MANDIRI    1220011559559   250 Unit, dll                                         6,834,270     6,157,000      677,270            -       6,834,270
                                                TELCO ABADI JAYA, CV, Pembelian Media
                                                Converter FO TO LAN UTP 2 Core
151    14-Feb-23     MANDIRI    1220011559559   Sebanyak 20 Unit                                      7,392,600     6,660,000      732,600            -       7,392,600
                                                CAKRAWALA ENERGI NUSANTARA, PT,
                                                Tagihan 90% atas Pekerjaan Penarikan
                                                Kabel FO Final as Build Kab.Sleman Akses
152    14-Feb-23     MANDIRI    1220011559559   Site - Catur Tunggal-029                            217,214,103   203,003,835    22,330,421    8,120,153    217,214,103
                                                TOWER OPERATION, Biaya Jasa
                                                Pengurusan NIDI dan SLO PLN Upgrade
                                                Daya 5500 VA to 11000 VA Site Roomo-
                                                003 & Site Sekarkurung-002 keperluan
153    14-Feb-23     MANDIRI    1220011559559   aktivitas H3I SWAP & ADD RRU                           934,000       934,000            -             -         934,000

                                              BANYU MANUNGGAL SEJAHTERA, PT,
                                              Tagihan 100% atas Relokasi 1 Pekerjaan
                                              ME Grounding & Accessories Telematika
154    16-Feb-23     MANDIRI    1220011559559 Tiang Beton 14/900 Site Marga Jaya-003                  8,544,302     7,885,835      867,442      208,975       8,544,302

                                              BANYU MANUNGGAL SEJAHTERA, PT,
                                              Tagihan 100% atas Relokasi 1 Pekerjaan
                                              ME Grounding & Accessories Telematika
155    16-Feb-23     MANDIRI    1220011559559 Tiang Beton 14/900 Site Marga Jaya-003                  3,083,208     2,845,600      313,016       75,408       3,083,208

                                              BANYU MANUNGGAL SEJAHTERA, PT,
                                              Tagihan 100% atas Relokasi 1 Pekerjaan
                                              ME Grounding & Accessories Telematika
156    16-Feb-23     MANDIRI    1220011559559 Tiang Beton 14/900 Site Marga Jaya-003                 16,980,037    15,671,469     1,723,862     415,294      16,980,037

                                              BANYU MANUNGGAL SEJAHTERA, PT,
                                              Tagihan 100% atas Relokasi 1 Pekerjaan
                                              ME Grounding & Accessories Telematika
157    16-Feb-23     MANDIRI    1220011559559 Tiang Beton 14/900 Site Marga Jaya-003                 19,448,134    17,949,362     1,974,430     475,658      19,448,134
                                              TOWER OPERATION, Uang Muka Beban
                                              Umum atas FPU Biaya UJL Migrasi KWH
                                              Prabayar ke Pascabayar Batch 2 (2023) -
                                              Site : Pondok Labu-018 & Pasar
158    16-Feb-23     MANDIRI    1220011559559 Minggu006 - Trf                                         3,640,000     3,640,000           -             -       3,640,000
Page 28
        TANGGAL      REKENING      NOMOR                                                                                            NILAI YANG DIBAYARKAN
      PENGELUARAN   BANK YANG   REKENING BANK                                                                                                                      NET
NO.      DI BANK    DIGUNAKAN       YANG            NAMA VENDOR DAN KETERANGAN                  NILAI MUTASI BANK      DPP            PPN           PPh        DIBAYARKAN
                                                 AREA KOTA BEKASI, Pelunasan Biaya
                                                 Akuisisi (Sewa Lahan) Site Kota Baru-006/
                                                 710060 Priority Smartfren - Kota Bekasi
159    17-Feb-23     MANDIRI    1220011559559    Selama 10 Tahun                                      136,000,000    136,000,000            -             -     136,000,000
                                                 HANDASA KONSULTAN, PT, Jasa Soil Test
160    20-Feb-23     MANDIRI    1220011559559    dan Kajian Teknis site Arjosari-001                   16,662,500     15,500,000      1,705,000     542,500      16,662,500
                                                 CIPTABUANA TRANS ABADI, PT, Tagihan
                                                 100% Paket Pekerjaan FO Network
161    21-Feb-23     MANDIRI    1220011559559    Optimization 23.298m                               2,254,879,665   2,063,963,080   227,035,939   36,119,354   2,254,879,665
                                                 WAWAN HERMAWAN, Biaya Pekerjaan
                                                 Perbaikan FO Cut Link MCP Gianyar-004
                                                 to MCP Abianbase-001 dan Link MCP
162    22-Feb-23    SINARMAS     00002999994     Unggasan-001 to Site_02 Unud                           4,732,131      4,853,468            -       121,337       4,732,131
                                                 CIPTABUANA TRANS ABADI, PT, Tagihan
                                                 100% Paket Pekerjaan FO Network
163    24-Feb-23     MANDIRI    1220011559559    Optimization 13.272m                               1,696,228,325   1,552,611,739   170,787,291   27,170,705   1,696,228,325

                                              TOWER OPERATION, FPU Biaya Upgrade
164    24-Feb-23     MANDIRI    1220011559559 Daya KWH Pascabayar Tambora-003                           3,896,200      3,896,200            -             -       3,896,200
                                              AREA BADUNG, Biaya budget IW
                                              kontribusi Banjar Taman Griya MCP
165    27-Feb-23    SINARMAS     00002999994 Jimbaran-015 selama 10 tahun                               8,000,000      8,000,000            -             -       8,000,000
                                              AREA BADUNG, Biaya budget IW
                                              kontribusi Banjar dan Penyanding MCP
166    27-Feb-23    SINARMAS     00002999994 site Canggu-007 selama 10 tahun                           21,000,000     21,000,000            -             -      21,000,000
                                              BIBIT, Mr, Biaya pekerjaan relokasi pole
                                              BTS-01-029-2017 FO link site_18 to site
167    27-Feb-23    SINARMAS     00002999994 25 Jl Gunung Sanghyang, DPS                                 956,563         986,147            -        29,585         956,563
                                              BIBIT, Mr, Biaya pekerjaan relokasi pole
                                              P7_05 FO link site 05 to site 47 Jl
168    27-Feb-23    SINARMAS     00002999994 Merdeka, Kuta Badung                                        956,563         986,147            -        29,585         956,563

                                                 PEMERINTAH KOTA MALANG, Biaya Sewa
                                                 Lahan 3 site (Arjosari-001,Jatimulyo-
                                                 004,Kasin-003) wilayah Kota Malang
                                                 selama 10 tahun (Pembayaran Termin II) -
169    27-Feb-23     MANDIRI    1220011559559    PR : 1010031918 - Trf                                270,000,000    270,000,000            -             -     270,000,000
                                                 ASIA TELCO NETWORKS, PT, Pembelian
                                                 Patchcord SM Duplex LC/UPC-SC/UPC
                                                 2MM 5M 30 Unit, Patchcord SM Duplex
170    01-Mar-23     MANDIRI    1220011559559    FC/UPC-LC/UPC 2MM 5M 10 Unit, dll                      6,414,135      5,778,500       635,635            -       6,414,135
                                                 ASIA TELCO NETWORKS, PT, Pembelian
                                                 Fast Connector SC/APC Sebanyak 2.500
171    01-Mar-23     MANDIRI    1220011559559    Pcs                                                   24,664,200     22,220,000      2,444,200           -      24,664,200
                                                 TADYA MANDIRI SINERGI, PT, Tagihan
                                                 100% atas Pekerjaan Penarikan Kabel FO
                                                 Final as Build Kota Surakarta - Akses Site -
172    01-Mar-23     MANDIRI    1220011559559    MP POPDA                                               4,578,530      4,279,000       470,690      171,160       4,578,530
                                                 AREA KAB GRESIK, Uang Muka Beban
                                                 Umum atas Biaya Sewa (Akuisisi) Lahan
                                                 Site Dahanrejo-002/741705 Priority H3I
                                                 Kab. Gresik (Periode 2023-2026) - PR :
173    02-Mar-23     MANDIRI    1220011559559    1010032430 - Trf                                      36,000,000     36,000,000            -             -      36,000,000
                                                 HANDASA KONSULTAN, PT, Jasa Soil Test
174    02-Mar-23     MANDIRI    1220011559559    site Bukit Tumpeng                                     3,762,500      3,500,000       385,000      122,500       3,762,500
                                                 HANDASA KONSULTAN, PT, Jasa Soil Test
175    02-Mar-23     MANDIRI    1220011559559    dan Kajian Teknis site Kasin-003                      16,662,500     15,500,000      1,705,000     542,500      16,662,500

                                              HANDASA KONSULTAN, PT, Jasa Soil Test
176    02-Mar-23     MANDIRI    1220011559559 dan Kajian Teknis site Jatimulyo-004                     16,662,500     15,500,000      1,705,000     542,500      16,662,500

                                              HANDASA KONSULTAN, PT, Jasa Soil Test
177    02-Mar-23     MANDIRI    1220011559559 dan Kajian Teknis site Tamantirto-005                    15,050,000     14,000,000      1,540,000     490,000      15,050,000

                                              HANDASA KONSULTAN, PT, Jasa Soil Test
178    02-Mar-23     MANDIRI    1220011559559 dan Kajian Teknis site Ngestiharjo-009                   15,050,000     14,000,000      1,540,000     490,000      15,050,000
                                              ANDALAN KREATIF UTAMA, PT, Tagihan
                                              Retensi 10% atas Pekerjaan Penarikan
                                              Kabel FO di POI ISAT Kota Cimahi,POI SF
                                              KOL Masturi,POI XL HUT Cimahi,Baros-
                                              003,Cibabat-004,Cipageran-
179    02-Mar-23     MANDIRI    1220011559559 015,Setiamanah-004                                       14,915,538     13,939,755      1,533,373     557,590      14,915,538
                                              ANDALAN KREATIF UTAMA, PT, Tagihan
                                              Retensi 10% atas Pekerjaan Penarikan
                                              Kabel FO di MP-Utama-003,MP-
180    02-Mar-23     MANDIRI    1220011559559 Setiamanah-007,MP-Daeng Mohamad                       38,718,940.00     36,185,925      3,980,452    1,447,437   38,718,940.00

                                              PEMERINTAH KOTA TANGGERANG, Uang
                                              Muka Beban Umum atas Biaya Retribusi
                                              Pemanfaatan Lahan Kabel Fiber Optik di 2
                                              Ruas Kota Tangerang Periode Tahun 2023 -
181    02-Mar-23     MANDIRI    1220011559559 PR : 1010032368 - Trf                                    57,390,000     57,390,000            -             -      57,390,000
                                              SANTA MULTI SEMESTA, PT, Tagihan
                                              100% atas Pekerjaan Rektifikasi Penarikan
                                              Kabel FO Link BB MP-Rawa Barat - Cyber
182    03-Mar-23     MANDIRI    1220011559559 Site MP-Rawa Barat-001                                    3,494,282      3,265,684       359,225      130,627       3,494,282
                                              SANTA MULTI SEMESTA, PT, Tagihan
                                              100% atas Pekerjaan Perbaikan FO Cluster
                                              site Jovis SF Batch 7 site Kuningan Timur-
183    03-Mar-23     MANDIRI    1220011559559 018                                                       5,409,301      5,055,421       556,096      202,216       5,409,301
Page 29
        TANGGAL      REKENING      NOMOR                                                                                     NILAI YANG DIBAYARKAN
      PENGELUARAN   BANK YANG   REKENING BANK                                                                                                               NET
NO.      DI BANK    DIGUNAKAN       YANG            NAMA VENDOR DAN KETERANGAN            NILAI MUTASI BANK     DPP            PPN           PPh        DIBAYARKAN
                                                SANTA MULTI SEMESTA, PT, Tagihan
                                                100% atas Pekerjaan Rektifikasi FO
                                                Ducting Impact Normalisasi Saluran Air
184    03-Mar-23     MANDIRI    1220011559559   site Marunda-004                                   9,529,082     8,905,684      979,625      356,227       9,529,082
                                                SANTA MULTI SEMESTA, PT, Tagihan
                                                100% atas Pekerjaan Pemasangan Tiang
                                                FO Akses dan Perbaikan Kabel Landai site
185    03-Mar-23     MANDIRI    1220011559559   Babat-004                                         13,159,311    12,298,421     1,352,826     491,936      13,159,311
                                                SANTA MULTI SEMESTA, PT, Tagihan
                                                100% atas Pekerjaan Rektifikasi Jalur FO
                                                Ducting dan Pembuatan HH Concrete Site
186    03-Mar-23     MANDIRI    1220011559559   Bali Mester-005                                   17,457,568    16,315,484     1,794,703     652,619      17,457,568
                                                SANTA MULTI SEMESTA, PT, Tagihan
                                                100% atas Pekerjaan Rektifikasi FO
                                                Ducting Impact Pembangunan Trotoar
187    03-Mar-23     MANDIRI    1220011559559   Jl.Raden Saleh Site MP-Cikini-001                 23,328,016    21,801,884     2,398,207     872,075      23,328,016
                                                SANTA MULTI SEMESTA, PT, Tagihan
                                                100% atas Pekerjaan Rektifikasi FO
                                                Ducting Bending Impact HDPE Timbul Site
188    03-Mar-23     MANDIRI    1220011559559   MP-Duri Kepa-001                                  15,086,662    14,099,684     1,550,965     563,987      15,086,662
                                                SANTA MULTI SEMESTA, PT, Tagihan
                                                100% atas Pekerjaan Install Tiang FO 9mtr
                                                dan Perapihan Kabel FO Landai Site Pluit-
189    03-Mar-23     MANDIRI    1220011559559   024                                               10,375,170     9,696,421     1,066,606     387,857      10,375,170

                                                SANTA MULTI SEMESTA, PT, Tagihan
                                                100% atas Pekerjaan Pemasangan Tiang
                                                FO dan Perbaikan Kabel FO Landai Site MP-
190    03-Mar-23     MANDIRI    1220011559559   Kelapa Gading Barat-001                          12,093,444     11,302,284     1,243,251     452,091      12,093,444
                                                SANTA MULTI SEMESTA, PT, Tagihan
                                                100% atas Pekerjaan Pemasangan Tiang
                                                FO 9mtr dan Perbaikan Kabel FO Site MP-
191    03-Mar-23     MANDIRI    1220011559559   Gambir-001                                        6,315,590      5,902,421      649,266      236,097       6,315,590
                                                SANTA MULTI SEMESTA, PT, Tagihan
                                                100% atas Pekerjaan Pemasangan Tiang
                                                FO 9mtr dan Rektifikasi Kabel FO Site
192    03-Mar-23     MANDIRI    1220011559559   Sawangan Baru-001                                12,577,512     11,754,684     1,293,015     470,187      12,577,512
                                                SANTA MULTI SEMESTA, PT, Tagihan
                                                100% atas Pekerjaan Relokasi Tiang FO
                                                Impact SDA dan Perbaikan Kabel FO
193    03-Mar-23     MANDIRI    1220011559559   Landai Site Meruya Selatan-004                    3,610,912      3,374,684      371,215      134,987       3,610,912
                                                SANTA MULTI SEMESTA, PT, Tagihan
                                                100% atas Pekerjaan Tarik Mundur Kabel
                                                FO Ext Impact Relokasi MCP Lama ke MCP
194    03-Mar-23     MANDIRI    1220011559559   Baru site Gambir-027                              2,657,542      2,483,684      273,205       99,347       2,657,542
                                                SANTA MULTI SEMESTA, PT, Tagihan
                                                100% atas Pekerjaan Rektifikasi FO
                                                Ducting Impact HDPE Terbakar site Suka
195    03-Mar-23     MANDIRI    1220011559559   Damai-006                                         4,320,322      4,037,684      444,145      161,507       4,320,322
                                                ASSALAMAH CAHAYA SAKTI , PT, Tagihan
                                                100% atas Pekerjaan Penarikan Kabel FO
                                                Final as Build Kota Bandung - Akses Site -
                                                Gedung Science and Techno Park (STP)
196    03-Mar-23     MANDIRI    1220011559559   ITB                                              10,319,460      9,445,730     1,039,030     165,300      10,319,460

                                              ASSALAMAH CAHAYA SAKTI , PT, Tagihan
                                              100% atas Pekerjaan Penarikan Kabel FO
                                              Final as Build Kota Bandung - Akses Site
                                              RK0004 Office Bandung - Relok FO KU ke
197    03-Mar-23     MANDIRI    1220011559559 KT Jl.Juanda (Crossing Cikapayang)                 14,625,729     13,387,395     1,472,613     234,279      14,625,729
                                              AREA BADUNG, Biaya akuisisi sewa lahan
                                              site Jimbaran-015 dengan luas lahan 4
                                              m2,dengan jangka waktu selama 10
                                              tahun periode 2023-2033 (PO
                                              Rp.177.777.777,- Potongan PPh 4(2) 10%
198    06-Mar-23     MANDIRI    1220011559559 Rp.17.777.777,- )                                 160,000,000    177,777,777           -     17,777,777    160,000,000
                                              CIRCLECOM NUSANTARA INDONESIA, PT,
                                              Sewa Lahan site Kapuk Muara-020
                                              periode 11/12/2022 - 10/12/2023, site
                                              Kamal Muara-035 periode 18/10/2022 -
                                              17/10/2023 dan site Kapuk Muara-016
                                              periode 20/10/2022 - 19/10/2023, Site
                                              Kamal Muara-025 periode 14/11/22 -
199    07-Mar-23     MANDIRI    1220011559559 13/11/2023                                        242,400,000    240,000,000    26,400,000   24,000,000    242,400,000

                                                POLA REKAYASA UTAMA, PT, Jasa Survey,
                                                Soil Test, Analisa Capacity, Analisa
                                                Strengthening, dan Perkuatan Foundation
200    08-Mar-23     MANDIRI    1220011559559   Kamuflase 15m site Bali Collection               16,662,500     15,500,000     1,705,000     542,500      16,662,500
                                                POLA REKAYASA UTAMA, PT, Jasa Survey,
                                                Soil Test, Analisa Capacity dan Analisa
                                                Strengthening Foundation MP 30m site
201    08-Mar-23     MANDIRI    1220011559559   Jimbaran Uluwatu                                 16,662,500     15,500,000     1,705,000     542,500      16,662,500
                                                POLA REKAYASA UTAMA, PT, Jasa Survey,
                                                Analisa Capacity dan Analisa
                                                Strengthening Foundation MP 30m site
202    08-Mar-23     MANDIRI    1220011559559   Panji Dalung                                     11,825,000     11,000,000     1,210,000     385,000      11,825,000
                                                POLA REKAYASA UTAMA, PT, Jasa Survey,
                                                Soil Test, Analisa Capacity, Analisa
                                                Strengthening, dan Perkuatan Foundation
203    08-Mar-23     MANDIRI    1220011559559   MP 30m site Kori                                 16,662,500     15,500,000     1,705,000     542,500      16,662,500
Page 30
        TANGGAL      REKENING      NOMOR                                                                                          NILAI YANG DIBAYARKAN
      PENGELUARAN   BANK YANG   REKENING BANK                                                                                                                     NET
NO.      DI BANK    DIGUNAKAN       YANG            NAMA VENDOR DAN KETERANGAN             NILAI MUTASI BANK        DPP              PPN           PPh        DIBAYARKAN
                                                AREA BADUNG, Biaya akuisisi sewa lahan
                                                Site Benoa 016 dengan luas lahan 4
                                                m2,dengan jangka waktu selama 10
                                                tahun periode 2023-2033 (PO
                                                Rp.166.666.666,- Potongan PPh 4(2) 10%
204    09-Mar-23     MANDIRI    1220011559559   Rp.16.666.666 )                                   150,000,000     166,666,666              -     16,666,666     150,000,000
                                                DJAJA LISTRIK, PT, Pembelian Steel Plate L
                                                2.400MM W 1.200 MM T 1.2MM
205    09-Mar-23     MANDIRI    1220011559559   Sebanyak 4 Lbr                                      6,105,000        5,500,000        605,000            -         6,105,000
                                                KESA UTAMA SEJAHTERA, PT, Tagihan
                                                90% Biaya pekerjaan Collocation XL Site
                                                M_42 Tibubeneng (PO Rp.5.507.132,-
                                                PPN Rp.491.177,- Potongan PPh 4(2)
206    09-Mar-23    SINARMAS     00002999994    1.75% Rp.78.142,- )                                 4,878,277        4,465,242        491,177       78,142         4,878,277
                                                ASIA TELCO NETWORKS, PT, Pembelian
                                                Patchcord SM Simplex LC/UPC-SC/APC
207    09-Mar-23     MANDIRI    1220011559559   2MM 1.5M Sebanyak 50 Unit                           1,005,938         906,250          99,688            -         1,005,938
                                                ASIA TELCO NETWORKS, PT, Patchcord
                                                SM Simplex LC/UPC-SC/UPC 2MM 3M
208    09-Mar-23     MANDIRI    1220011559559   Sebanyak 100 Unit                                   1,942,500        1,750,000        192,500            -         1,942,500
                                                ASIA TELCO NETWORKS, PT, Pembelian
                                                Patchcord SM Duplex SC/UPC-LC/UPC
                                                3MM 5M 20 Pcs, Patchcord SM Duplex
209    09-Mar-23     MANDIRI    1220011559559   SC/UPC-SC/UPC 3MM 3M 15 Unit, dll                   5,077,001        4,573,875        503,126            -         5,077,001
                                                AREA BADUNG, Biaya akuisisi sewa lahan
                                                site Canggu -007 dengan luas lahan 1
                                                m2,dengan jangka waktu selama 10
                                                tahun periode 2023-2033 (PO
                                                Rp.111.111.111,- Potongan PPh 4(2) 10%
210    10-Mar-23     MANDIRI    1220011559559   Rp.11.111.111,- )                                 100,000,000     111,111,111              -     11,111,111     100,000,000
                                                AREA BADUNG, Biaya akuisisi sewa lahan
                                                Site Kerobokan Kelod 021 dengan luas
                                                lahan 4 m2,dengan jangka waktu selama
                                                10 tahun periode 2023-2033 (PO
                                                Rp.222.222.222,- Potongan PPh 4(2) 10%
211    13-Mar-23     MANDIRI    1220011559559   Rp.22.222.222,- )                                 200,000,000     222,222,222              -     22,222,222     200,000,000
                                                NOBI PUTRA ANGKASA, PT, Tagihan 100%
                                                atas Pengadaan Modular DC XL 3 System
212    13-Mar-23     MANDIRI    1220011559559   sebanyak 10 Set                                   110,833,500      99,850,000      10,983,500            -      110,833,500
                                                HUME SAKTI INDONESIA, PT, Tagihan
                                                100% atas Pekerjaan Instalasi Tiang
                                                Telematika Beton 14/900 Site Kelapa
213    13-Mar-23     MANDIRI    1220011559559   Gading Timur-016                                    7,405,722        6,835,000        751,850      181,128         7,405,722
                                                HUME SAKTI INDONESIA, PT, Tagihan
                                                100% atas Relokasi 1 Pekerjaan Instalasi
                                                Telematika Tiang Beton 14/900 Site
214    13-Mar-23     MANDIRI    1220011559559   Klender-020                                        15,531,972      14,335,000       1,576,850      379,878       15,531,972
                                                HUME SAKTI INDONESIA, PT, Tagihan
                                                100% atas Pekerjaan Dismantle Tiang
                                                Beton Telematika 14/900 site Mekargalih
215    13-Mar-23     MANDIRI    1220011559559   Purwakarta-001                                     14,605,580      13,480,000       1,482,800      357,220       14,605,580
                                                KALIABANG JAYA PRATAMA, PT, Tagihan
                                                100% atas Pekerjaan Penarikan Kabel FO
                                                Final as Build Kab.Sidoarjo - Akses Site -
216    13-Mar-23     MANDIRI    1220011559559   Tawangsari Sidoarjo-006                           108,053,883      99,726,704      10,969,937     2,642,758     108,053,883

                                                ZTE INDONESIA, PT, Tagihan Pelunasan
                                                90% Battery Lithium 48V 100AH ZXDC48
217    14-Mar-23     MANDIRI    1220011559559   FB100B3 ZTE Batch-1 sebanyak 1000 unit        17,398,034,550    15,673,905,000   1,724,129,550           -    17,398,034,550
                                                DUTA HITA JAYA, PT, Tagihan Pelunasan
                                                70% atas Pengadaan 2nd Bordes MCP
                                                21M for Maintenance OPS sebanyak 55
218    15-Mar-23     MANDIRI    1220011559559   Set                                              77,889,081        77,889,081              -             -       77,889,081
                                                DUTA HITA JAYA, PT, Tagihan Pelunasan
                                                70% atas Pengadaan Plate Setting
                                                sebanyak 10Pcs dan Anchor sebanyak
219    15-Mar-23     MANDIRI    1220011559559   80Pcs                                            12,964,756        12,964,756              -             -       12,964,756
                                                KOMANG PARSUDA YASADANA, Biaya
                                                pekerjaan perbaikan Kabel FO Link BLL_15
                                                Lokapaksa to BSC Seririt.(PO
                                                Rp.3.892.628,- Potongan PPh 21(3%)
220    16-Mar-23    SINARMAS     00002999994    Rp.116.779,- )                                     3,775,849         3,892,628             -       116,779         3,775,849
                                                MAREJANI, PT, Tagihan 90% Pekerjaan
                                                CCTV Diskominfo Kabupaten Badung
                                                (Segment Site_45 Sri Rama to Site_46
                                                Legian) (PO Rp.23.496.702,- PPN
                                                Rp.2.095.652,- Potongan PPh 4(2) 1.75%
221    16-Mar-23     MANDIRI    1220011559559   Rp.333.399,- )                                   20,813,633        19,051,380       2,095,652      333,399       20,813,633
                                                CAKRAWALA ENERGI NUSANTARA, PT,
                                                Tagihan 100% atas Pekerjaan Penarikan
                                                Kabel FO Final as Build Jakarta Timur -
                                                Akses Relokasi FO Site Jl.Raden Inten II
                                                Segmen 2 (Simpang Jl Taman Malaka
222    16-Mar-23     MANDIRI    1220011559559   Selatan                                         226,097,206       211,305,800      23,243,638     8,452,232     226,097,206
                                                KALIABANG JAYA PRATAMA, PT, Tagihan
                                                100% atas Pekerjaan Penarikan Kabel FO
                                                Final as Build Jakarta Timur - Akses Site -
223    16-Mar-23     MANDIRI    1220011559559   Proteksi OLT Cipayung-018                        14,220,721        13,124,800       1,443,728      347,807        14,220,721
Page 31
        TANGGAL      REKENING      NOMOR                                                                                       NILAI YANG DIBAYARKAN
      PENGELUARAN   BANK YANG   REKENING BANK                                                                                                                 NET
NO.      DI BANK    DIGUNAKAN       YANG         NAMA VENDOR DAN KETERANGAN               NILAI MUTASI BANK       DPP            PPN           PPh        DIBAYARKAN
                                              KALIABANG JAYA PRATAMA, PT, Tagihan
                                              90% atas Pekerjaan Penarikan Kabel FO
                                              Final as Build Kota Jakarta Timur - Akses
                                              Site - Proteksi OLT Cipinang Besar Selatan-
224    16-Mar-23     MANDIRI    1220011559559 006                                                 13,424,632     12,390,063      1,362,906     328,337        13,424,632
                                              KALIABANG JAYA PRATAMA, PT, Tagihan
                                              100% atas Pekerjaan Penarikan Kabel FO
                                              Final as Build Kota Bekasi - Akses Site -
225    16-Mar-23     MANDIRI    1220011559559 Proteksi OLT JTASH-1                                 6,121,775      5,650,000       621,500      149,725         6,121,775

                                              KALIABANG JAYA PRATAMA, PT, Tagihan
                                              100% atas Pekerjaan Penarikan Kabel FO
                                              Final as Build Jakarta Timur - Akses Site -
226    16-Mar-23     MANDIRI    1220011559559 Proteksi OLT Kampung Melayu-015                    20,914,584      19,302,800      2,123,308     511,524        20,914,584
                                              CIPTABUANA TRANS ABADI, PT, Tagihan
                                              100% Paket Pekerjaan FO Network
227    17-Mar-23     MANDIRI    1220011559559 Optimization 16.335m                             1,960,637,901   1,794,634,234   197,409,766   31,406,099    1,960,637,901
                                              DUTA HITA JAYA, PT, DP 30% Atas
                                              Pengadaan Material Requirement
                                              Strengthening MP 30M 3 System
228    20-Mar-23     MANDIRI    1220011559559 sebanyak 3 Set                                     83,812,784      83,812,784            -             -       83,812,784

                                              DUTA HITA JAYA, PT, Tagihan Pelunasan
                                              70% atas Pengadaan Monopole 21M Steel
229    20-Mar-23     MANDIRI    1220011559559 sebanyak 5 Set - PPN                               41,649,216              -      41,649,216           -       41,649,216
                                              DUTA HITA JAYA, PT, DP 30% atas
                                              Pengadaan Steel Pole 21M sebanyak 10
230    20-Mar-23     MANDIRI    1220011559559 Set - PPN                                          36,921,720              -      36,921,720           -       36,921,720
                                              DUTA HITA JAYA, PT, Pelunasan 70%
                                              Pengadaan Commy Body Pole, Ring
                                              Mounting, Bordest 1 dan Bordest 2,
                                              Anchor M24 dan Accessories MP36
231    20-Mar-23     MANDIRI    1220011559559 sebanyak 1set - PPN                                26,503,562              -      26,503,562           -       26,503,562

                                              DUTA HITA JAYA, PT, DP 30% atas
                                              Pengadaan 2nd Bordes MCP 21M for
232    20-Mar-23     MANDIRI    1220011559559 Maintenance OPS sebanyak 55 Set - PPN                3,671,913             -       3,671,913           -         3,671,913
                                              MEDIA FIROPTIX INDONESIA, PT, Tagihan
                                              100% atas Pekerjaan Penarikan Kabel FO
                                              Final as Build Jakarta Selatan - Akses Site -
                                              Relokasi Pembangunan Waduk Brigif
233    20-Mar-23     MANDIRI    1220011559559 (Jalan Moh Kahfi 1)                                39,821,625      36,450,000      4,009,500     637,875       39,821,625

                                                  AMARTA JAYA TELEKOMINDO, PT,
                                                  Tagihan Retensi 10% atas Pekerjaan
                                                  Penarikan Kabel FO Plan Kabupaten
                                                  Gresik MP-KH Syahfi, MP-Sukorame-008,
234    21-Mar-23     MANDIRI    1220011559559     MP-Klangonan-002,MP-Usman Sadar             131,897,077.00    120,729,590     13,280,255    2,112,768   131,897,077.00
                                                  DPO FPU, Biaya Pembayaran Untuk
                                                  Penyambungan PLN Sementara Site
                                                  701478 Sunter Agung-023 akibat
235    21-Mar-23     MANDIRI    1220011559559     pencurian box KWH                                4,668,016      4,668,016            -             -         4,668,016
                                                  DANANG DWI YUNAWANTO, Pekerjaan
                                                  penambahan 3 titik akses point di Badan
                                                  Pertanahan Kabupaten Badung(PO
                                                  Rp.1.640.000,- Potongan PPh 21(3%)
236    24-Mar-23    SINARMAS     00002999994      Rp.49.200,- )                                    1,590,800      1,640,000            -        49,200         1,590,800
                                                  JASA KELISTRIKAN INDONESIA, PT, Jasa
                                                  Pengurusan NIDI dan SLO Daya 3500 Site
                                                  M_331 Hotel Harris dan SLO Daya 16.500
                                                  Site M_332 AP Bali-Area Parkir (PO
                                                  Rp.2.562.500,- Potongan PPh 23(2%)
237    24-Mar-23    SINARMAS     00002999994      Rp.51.250,- )                                    2,511,250      2,562,500            -        51,250         2,511,250
                                                  JASA KELISTRIKAN INDONESIA, PT, Jasa
                                                  Pengurusan NIDI dan SLO Daya 33.000 VA
                                                  Site M_335 Angkasa Pura Bali Area Cargo
                                                  (PO Rp.4.125.000,- Potongan PPh 23(2%)
238    24-Mar-23    SINARMAS     00002999994      Rp.82.500,- )                                    4,042,500      4,125,000            -        82,500         4,042,500
                                                  BIBIT, Mr, Biaya Pekerjaan Perbaikan
                                                  Tiang miring P7_13 FO Aksess M_10 Jln.
                                                  Sawangan - Nusa Dua (PO Rp.951.147,-
239    24-Mar-23    SINARMAS     00002999994      Potongan PPh 21(3%) Rp.28.534,41,-)            922,612.59         951,147            -        28,534       922,612.59
                                                  WAWAN HERMAWAN, Biaya Pekerjaan
                                                  Penyambungan FO Cut Link M_29 Pura
                                                  Uluwatu TT. I0124-014 dan Perbaikan FO
                                                  Cut CCTV KRBKL_015 TT. I0118-008(PO
                                                  Rp.3.711.348,- Potongan PPh 21(2.5%)
240    24-Mar-23    SINARMAS     00002999994      Rp.92.784,- )                                    3,618,564      3,711,348            -        92,784         3,618,564
                                                  WAWAN HERMAWAN, Biaya Pekerjaan
                                                  Perbaikan FO Cut Link Redundat RNC
                                                  Tabanan (PO Rp.4.815.108,- Potongan
241    24-Mar-23    SINARMAS     00002999994      PPh 21(2.5%) Rp.120.378,-)                       4,694,730      4,815,108            -       120,378         4,694,730
                                                  CIPTABUANA TRANS ABADI, PT, Tagihan
                                                  100% Paket Pekerjaan FO Network
242    24-Mar-23     MANDIRI    1220011559559     Optimization 18.271m                         2,341,132,270   2,142,912,832   235,720,412   37,500,974    2,341,132,270
                                                  BANYU MANUNGGAL SEJAHTERA, PT,
                                                  Tagihan 100% atas Relokasi 1 Pekerjaan
                                                  ME Grounding & Accessories Telamatia
                                                  Tiang Beton 14/900 Site MP-Sunter Agung-
243    28-Mar-23     MANDIRI    1220011559559     001                                              8,544,301      7,885,833       867,442      208,974         8,544,301
Page 32
        TANGGAL      REKENING        NOMOR                                                                                         NILAI YANG DIBAYARKAN
      PENGELUARAN   BANK YANG     REKENING BANK                                                                                                                  NET
NO.      DI BANK    DIGUNAKAN         YANG             NAMA VENDOR DAN KETERANGAN               NILAI MUTASI BANK     DPP            PPN           PPh       DIBAYARKAN
                                                   BANYU MANUNGGAL SEJAHTERA, PT,
                                                   Tagihan 100% atas Relokasi 1 Pekerjaan
                                                   Civil Work Telematika Tiang Beton 14/900
244    28-Mar-23      MANDIRI     1220011559559    Site Kebon Kelapa-005                                16,980,038    15,671,469     1,723,862     415,293     16,980,038
                                                   SWARA UTAMA GLOBAL, PT, Tagihan
                                                   100% atas Pekerjaan Instalasi Asesoris &
                                                   CCTV Tiang Telematika Tiang Beton
245    28-Mar-23      MANDIRI     1220011559559    14/900 Site Setabelan-004                             1,390,023     1,282,900      141,119       33,996      1,390,023
                                                   SWARA UTAMA GLOBAL, PT, Tagihan
                                                   100% atas Pekerjaan Instalasi Asesoris &
                                                   CCTV Tiang Telematika Tiang Beton
246    28-Mar-23      MANDIRI     1220011559559    14/900 Site Mangkubumen-010                           1,390,023     1,282,900      141,119       33,996      1,390,023
                                                   SWARA UTAMA GLOBAL, PT, Tagihan
                                                   100% atas Pekerjaan Instalasi Asesoris &
                                                   CCTV Tiang Telematika Tiang Beton
247    28-Mar-23      MANDIRI     1220011559559    14/900 Site Panularan-008                             1,390,023     1,282,900      141,119       33,996      1,390,023
                                                   SWARA UTAMA GLOBAL, PT, Tagihan
                                                   100% atas Pekerjaan Instalasi Asesoris &
                                                   CCTV Tiang Telematika Tiang Beton
248    28-Mar-23      MANDIRI     1220011559559    14/900 Site Timuran-003                               1,390,023     1,282,900      141,119       33,996      1,390,023
                                                   SWARA UTAMA GLOBAL, PT, Tagihan
                                                   100% atas Pekerjaan Instalasi Asesoris &
                                                   CCTV Tiang Telematika Tiang Beton
249    28-Mar-23      MANDIRI     1220011559559    14/900 Site Setabelan-001                             1,390,023     1,282,900      141,119       33,996      1,390,023
                                                   SWARA UTAMA GLOBAL, PT, Tagihan
                                                   100% atas Pekerjaan Instalasi Asesoris &
                                                   CCTV Tiang Telematika Tiang Beton
250    28-Mar-23      MANDIRI     1220011559559    14/900 Site Punggawan-001                             1,390,023     1,282,900      141,119       33,996      1,390,023
                                                   SWARA UTAMA GLOBAL, PT, Tagihan
                                                   100% atas Pekerjaan Instalasi Asesoris &
                                                   CCTV Tiang Telematika Tiang Beton
251    28-Mar-23      MANDIRI     1220011559559    14/900 Site Tipes-008                                 1,390,023     1,282,900      141,119       33,996      1,390,023
                                                   MALAKA KARYA UTAMA, PT, Tagihan
                                                   Retensi 10% Pekerjaan Penarikan Kabel
                                                   FO Final as Build Kota Bekasi - Akses Site -
252    28-Mar-23      MANDIRI     1220011559559    Sumur Batu Bantargebang-001                           6,660,979     6,147,650      676,241      162,912      6,660,979
                                                   MDT TOTAL SOLUTION, PT, Pembelian
                                                   Patchcord SM Duplex SC/APC-SC/UPC
253    30-Mar-23      MANDIRI     1220011559559    2MM 3M Sebanyak 30 Pcs                                  965,700      870,000        95,700            -        965,700
                                                   PLN PERSERO, PT, Biaya pasang baru
                                                   Listrik PLN Daya 7700 VA Site Kerobokan
254    30-Mar-23     SINARMAS       00002999994    Kelod-020.                                            8,741,800     8,741,800           -             -      8,741,800
                                                   NOBI PUTRA ANGKASA, PT, Tagihan 100%
                                                   atas Pengadaan Modular ACPDB DCPDB 3
255    04-Apr-23    MANDIRI IDR   1220011559559    Phase sebanyak 24 Unit                              262,404,000   236,400,000    26,004,000           -    262,404,000

                                                ECRAFT TELEMATIKA MEDIA, PT, Tagihan
                                                100% atas Pekerjaan ME Goruding &
                                                Accessories Telematika Tiang Beton
256    04-Apr-23    MANDIRI IDR   1220011559559 14/900 Site Kebondalem-001                            18,030,368      16,850,811     1,853,589     674,032     18,030,368

                                                ECRAFT TELEMATIKA MEDIA, PT, Tagihan
                                                100% atas Pekerjaan ME Goruding &
                                                Accessories Telematika Tiang Beton
257    04-Apr-23    MANDIRI IDR   1220011559559 14/900 Site Mulyoharjo-006                            18,030,368      16,850,811     1,853,589     674,032     18,030,368

                                                ECRAFT TELEMATIKA MEDIA, PT, Tagihan
                                                100% atas Pekerjaan ME Goruding &
                                                Accessories Telematika Tiang Beton
258    04-Apr-23    MANDIRI IDR   1220011559559 14/900 Site Kebondalem-002                            18,030,368      16,850,811     1,853,589     674,032     18,030,368

                                                ECRAFT TELEMATIKA MEDIA, PT, Tagihan
                                                100% atas Pekerjaan ME Goruding &
                                                Accessories Telematika Tiang Beton
259    04-Apr-23    MANDIRI IDR   1220011559559 14/900 Site Mulyoharjo-005                            18,030,368      16,850,811     1,853,589     674,032     18,030,368
                                                ECRAFT TELEMATIKA MEDIA, PT, Tagihan
                                                100% atas Pekerjaan ME Goruding &
                                                Accessories Telematika Tiang Beton
260    04-Apr-23    MANDIRI IDR   1220011559559 14/900 Site Pelutan-003                               18,030,368      16,850,811     1,853,589     674,032     18,030,368

                                                ECRAFT TELEMATIKA MEDIA, PT, Tagihan
                                                100% atas Pekerjaan ME Goruding &
                                                Accessories Telematika Tiang Beton
261    04-Apr-23    MANDIRI IDR   1220011559559 14/900 Site Mulyoharjo-001                            18,030,368      16,850,811     1,853,589     674,032     18,030,368

                                               KALIABANG JAYA PRATAMA, PT, Tagihan
                                               100% atas Pekerjaan Relokasi 1
                                               (Dismantle & Re-Install) Perangkat Tenant
262    04-Apr-23     MANDIRI IDR 1220011559559 Pole Beton 14/900 Site Klego-003                       24,815,404      22,903,004     2,519,330     606,930     24,815,404
                                               KALIABANG JAYA PRATAMA, PT, Tagihan
                                               100% atas Pekerjaan Pemindahan dan
                                               Penambahan Tiang Jalur BB FO Site
263    04-Apr-23     MANDIRI IDR 1220011559559 Gedangan-003                                           12,705,121      11,726,000     1,289,860     310,739     12,705,121
                                               BIBIT, Mr, Biaya Perbaikan FO Cut
                                               TT.H1226-007 FO link GNY_04 to
                                               Sukawati_002 Jln. Raya Ubud dengan
                                               Metode Relokasi ke BOX SJUT Ubud(PO
                                               Rp.17.706.675,- Potongan PPh 21(3%)
264    06-Apr-23    SINARMAS IDR 0002999994    Rp.Rp.531.200,25)                                      17,175,475      17,706,675           -       531,200     17,175,475
Page 33
        TANGGAL      REKENING         NOMOR                                                                                          NILAI YANG DIBAYARKAN
      PENGELUARAN   BANK YANG      REKENING BANK                                                                                                                    NET
NO.      DI BANK    DIGUNAKAN          YANG       NAMA VENDOR DAN KETERANGAN                     NILAI MUTASI BANK      DPP            PPN           PPh        DIBAYARKAN
                                               CIPTABUANA TRANS ABADI, PT, Tagihan
                                               100% Paket Pekerjaan FO Network
265    10-Apr-23    MANDIRI IDR 1220011559559 Optimization 16.372m                                   2,127,077,832   1,946,981,996   214,168,020   34,072,184   2,127,077,832
                                               BIBIT, Mr, Biaya Perbaikan Peninggian
                                               HH_02 Grahadi (include penggantian
                                               tutup HH) dan HH_03 Graha Asih FO Link
                                               Site_05 to Site_06 Jl. Bypass Ngurah Ray -
                                               Badung (PO Rp.7.083.747,- Potongan PPh
266    11-Apr-23    SINARMAS IDR 0002999994    21(3%) Rp.212.512,-)                                      6,871,235      7,083,747            -       212,512       6,871,235
                                               IMAM TAUFIK, Biaya Perbaikan FO Cut
                                               Link Site_35 to Site_39 (TT. I0310-005) Jl.
                                               I Gusti Ngurah Rai, Carang Sari -Badung
                                               (PO Rp.1.942.900,- Potongan PPh 21(3%)
267    11-Apr-23    SINARMAS IDR 0002999994    Rp.58.287,-)                                              1,884,613      1,942,900            -        58,287       1,884,613
                                               REKAYASA TECHNOLOGY PERSADA, PT,
                                               Tagihan 90% atas Pekerjaan Penarikan
                                               Kabel FO Final as Build Kab.Tangerang -
                                               Akses Site - Cluster Backbone Sukabakti
268    11-Apr-23    MANDIRI IDR 1220011559559 Section C (Punchlist)                                    111,043,110    102,485,565     11,273,412    2,715,867    111,043,110
                                               DINAMIKA MAJU SELARAS, PT, Uang
                                               Muka Beban Umum atas Biaya Akuisisi
                                               Sewa Lahan Site Kapuk-052 792431 /
                                               Priority SF Jakarta Bara 03 Jan 2023 - 02
269    12-Apr-23     MANDIRI IDR 1220011559559 Jan 2028 - Trf                                           80,800,000     80,800,000            -             -      80,800,000
                                               CIPTABUANA TRANS ABADI, PT, Tagihan
                                               100% Paket Pekerjaan FO Network
270    12-Apr-23    MANDIRI IDR 1220011559559 Optimization 14.493m                                   1,914,168,456   1,752,099,273   192,730,920   30,661,737   1,914,168,456
                                               DIAN MUSTIKA AGUNG, PT, Pembelian
                                               Maktec MT90 Mesin Gerinda Tangan 1
                                               Unit, Mesin Bor Maktec MT60 10mm 3/8
271    14-Apr-23    MANDIRI IDR 1220011559559 1 Unit, dll                                                2,136,750      1,925,000       211,750            -       2,136,750

                                                    DJAJA LISTRIK, PT, Pembelian Cat Nippe
                                                    2.000 Matt Black 4 Kaleng, Masker Sensi
                                                    Earloop 4 Ply 2 Pcs, Sock Drat Luar Rucika
                                                    aw abu 4 Pcs, Sarung Tangan Nitrile non
272    14-Apr-23    MANDIRI IDR 1220011559559       Powder isi 50 pcs size L 2 Pak,dll                  12,186,579     10,978,900      1,207,679           -      12,186,579
                                                    SANTA MULTI SEMESTA, PT, Tagihan
                                                    100% atas Pekerjaan Penarikan Kabel FO
                                                    Final as Build Kota Jakarta Utara - Akses
                                                    Site - Kelapa Gading Barat-028 (Restorasi
273    14-Apr-23    MANDIRI IDR 1220011559559       FO)                                                 17,655,575     16,500,537      1,815,059     660,021      17,655,575
                                                    SANTA MULTI SEMESTA, PT, Tagihan
                                                    100% atas Pekerjaan Penarikan Kabel FO
                                                    Final as Build Kota Jakarta Barat - Akses
274    14-Apr-23    MANDIRI IDR 1220011559559       Site - Maphar-002 (Relokasi MCP)                     7,056,222      6,594,600       725,406      263,784       7,056,222
                                                    SANTA MULTI SEMESTA, PT, Tagihan
                                                    100% atas Pekerjaan Penarikan Kabel FO
                                                    Final as Build Kota Jakarta Pusat - Akses
275    14-Apr-23    MANDIRI IDR 1220011559559       Site - Gambir-027 (Relokasi MCP)                    13,269,926     12,401,800      1,364,198     496,072      13,269,926
                                                    PLN PERSERO, PT, Biaya Upgrade Daya
                                                    721905 Kebondalem-001 Priority XL -
                                                    Project Microcell Jawa Tengah Dibayarkan
276    14-Apr-23    MANDIRI IDR 1220011559559       langsung ke PLN                                      4,201,200      4,201,200            -             -       4,201,200

                                                 CIPTA SEDAYU ELEKTRINDO, PT, Tagihan
                                                 100% atas Pekerjaan Pengadaan Sertifikat
277    14-Apr-23    MANDIRI IDR    1220011559559 Laik Operasi (SLO) 10 Site                              6,812,500      6,250,000       687,500      125,000       6,812,500

                                                 CIPTA SEDAYU ELEKTRINDO, PT, Tagihan
                                                 100% atas Pekerjaan Pengadaan Sertifikat
278    14-Apr-23    MANDIRI IDR    1220011559559 Laik Operasi (SLO) 10 Site                              5,515,400      5,060,000       556,600      101,200       5,515,400

                                                 CIPTA SEDAYU ELEKTRINDO, PT, Tagihan
                                                 100% atas Pekerjaan Pengadaan Sertifikat
279    14-Apr-23    MANDIRI IDR    1220011559559 Laik Operasi (SLO) 10 Site                              5,515,400      5,060,000       556,600      101,200       5,515,400

                                              CIPTA SEDAYU ELEKTRINDO, PT, Tagihan
                                              100% atas Pekerjaan Pengadaan Sertifikat
280    14-Apr-23    MANDIRI IDR 1220011559559 Laik Operasi (SLO) 10 Site                                 5,054,330      4,637,000       510,070       92,740       5,054,330
                                              MEDIA FIROPTIX INDONESIA, PT, Tagihan
                                              100% atas Pekerjaan Penarikan Kabel FO
                                              Final as Build Jakarta Selatan - Akses Site -
281    14-Apr-23    MANDIRI IDR 1220011559559 Relokasi Jalan Moh Kahfi 1                                24,839,736     22,736,600      2,501,026     397,890      24,839,736
                                              SANTA MULTI SEMESTA, PT, Tagihan
                                              100% atas Pekerjaan Penarikan Kabel FO
                                              Final as Build Kota Bekasi - Akses Site -
282    14-Apr-23    MANDIRI IDR 1220011559559 Proteksi OLT Margahayu-008                                 8,228,300      7,690,000       845,900      307,600       8,228,300
                                              SANTA MULTI SEMESTA, PT, Tagihan
                                              100% atas Pekerjaan Penarikan Kabel FO
                                              Final as Build Kota Jakarta Selatan - Akses
283    14-Apr-23    MANDIRI IDR 1220011559559 Site - Proteksi OLT Karet-004                              9,909,912      9,261,600      1,018,776     370,464       9,909,912

                                                 SANTA MULTI SEMESTA, PT, Tagihan
                                                 100% atas Pekerjaan Penarikan Kabel FO
                                                 Final as Build Kota Jakarta Timur - Akses
284    14-Apr-23    MANDIRI IDR    1220011559559 Site - Proteksi OLT Malaka Jaya-001                     5,767,300      5,390,000       592,900      215,600       5,767,300
                                                 DUTA HITA JAYA, PT, Tagihan Pelunasan
                                                 70% atas Pengadaan 2nd Bordes MCP
                                                 21M for Maintenance OPS sebanyak 55
285    17-Apr-23    MANDIRI IDR    1220011559559 Set - PPN                                               8,567,798             -       8,567,798           -       8,567,798
Page 34
        TANGGAL      REKENING         NOMOR                                                                                        NILAI YANG DIBAYARKAN
      PENGELUARAN   BANK YANG      REKENING BANK                                                                                                                  NET
NO.      DI BANK    DIGUNAKAN          YANG       NAMA VENDOR DAN KETERANGAN                     NILAI MUTASI BANK    DPP            PPN           PPh        DIBAYARKAN
                                               DUTA HITA JAYA, PT, DP 30% Atas
                                               Pengadaan Material Requirement
                                               Strengthening MP 30M 3 System
286    17-Apr-23     MANDIRI IDR 1220011559559 sebanyak 3 Set - PPN                                      9,219,406           -       9,219,406           -       9,219,406
                                               DUTA HITA JAYA, PT, Tagihan Pelunasan
                                               70% atas Pengadaan Plate Setting
                                               sebanyak 10Pcs dan Anchor sebanyak
287    17-Apr-23     MANDIRI IDR 1220011559559 80Pcs - PPN                                               1,426,123           -       1,426,123           -       1,426,123
                                               PLN PERSERO, PT, Biaya Pasang Baru Site
                                               721050 Kradenan-004 Priority Indosat -
                                               Project Microcell Jawa Tengah
288    17-Apr-23    MANDIRI IDR 1220011559559 (dibayarkan langsung ke PLN)                              11,672,500    11,672,500           -             -      11,672,500
                                               PLN PERSERO, PT, Biaya Talangan atas
                                               Upgrade Daya PLN Site Kedanyang-002
289    17-Apr-23     MANDIRI IDR 1220011559559 dari 13200VA ke 16500VA                                   3,743,950     3,743,950           -             -       3,743,950
                                               EDI SLAMET, Biaya New Collocation
                                               Telkomsel Site_21 Celagi Basur (PO
                                               Rp.9.171.618,- Potongan PPh 21(2.5%)
290    18-Apr-23    SINARMAS IDR   0002999994  Rp.229.290,-                                              8,942,328     9,171,618           -       229,290       8,942,328
                                               EDI SLAMET, Biaya New Collocation
                                               Telkomsel Site_14 Pererenan (PO
                                               Rp.12.956.156,- Potongan PPh 21(2.5%)
291    18-Apr-23    SINARMAS IDR   0002999994  Rp.323.904,-                                             12,632,252    12,956,156           -       323,904      12,632,252

                                                    HANDASA KONSULTAN, PT, Termin II 40%
                                                    Untuk jasa Pengurusan Sertifikat Laik
                                                    Fungsi (SLF ) Site Dauh Puri Kelod 010 (PO
                                                    Rp.12.210.000,- PPN Rp.484.000,-
292    18-Apr-23    SINARMAS IDR    0002999994      Potongan PPh 4(2) 3.5% Rp.154.000,- )                4,730,000     4,300,000      430,000            -       4,730,000
                                                    PLN PERSERO, PT, Biaya Pasang Baru
                                                    Listrik PLN 7.700 VA Site Kerobokan Kelod-
293    18-Apr-23    SINARMAS IDR    0002999994      021                                                  7,671,300     7,671,300           -             -       7,671,300
                                                    PLN PERSERO, PT, Biaya Pasang Baru
294    18-Apr-23    SINARMAS IDR    0002999994      Listrik PLN 7.700 VA Site Jimbaran-015               7,671,300     7,671,300           -             -       7,671,300
                                                    PLN PERSERO, PT, Biaya Pasang Baru
295    18-Apr-23    SINARMAS IDR    0002999994      Listrik PLN 7.700 VA Site Canggu-007                 7,671,300     7,671,300           -             -       7,671,300
                                                    PLN PERSERO, PT, "Biaya Pasang Baru
296    18-Apr-23    SINARMAS IDR    0002999994      Listrik PLN 7.700 VA Site Benoa-016                  7,671,300     7,671,300           -             -       7,671,300
                                                    PLN PERSERO, PT, Biaya registrasi PLN site
297    18-Apr-23    SINARMAS IDR    0002999994      (Seminyak-001).                                      7,671,300     7,671,300           -             -       7,671,300

                                               MAJU BERSAMA SOLUSINDO, PT, Tagihan
                                               100% atas Pekerjaan Relokasi Jl.R.A
298    18-Apr-23     MANDIRI IDR 1220011559559 Fadillah Jakarta Timur Site MP-Baru-002                 138,064,989   127,425,001    14,016,750    3,376,762    138,064,989
                                               BIBIT, Mr, Biaya Perbaikan FO Cut Link
                                               DPS_02 to Sukawati_002 (TT. I0318-006)
                                               Jl. Raya Sukawati-Gianyar (PO
                                               Rp.1.674.900,- Potongan PPh 21(3%)
299    18-Apr-23    SINARMAS IDR 0002999994    Rp.50.247,- )                                             1,624,653     1,674,900           -        50,247       1,624,653
                                               CAKRAWALA ENERGI NUSANTARA, PT,
                                               Tagihan 100% atas Pekerjaan Perbaikan
                                               Hand Hole bersama Impact Pekerjaan
300    18-Apr-23    MANDIRI IDR 1220011559559 Trotoar Site MP-Pegangsaan-001                            25,223,842    23,573,684     2,593,105     942,947      25,223,842
                                               IMAM TAUFIK, Biaya Perbaikan FO Cut
                                               Link BLL_08 Beratan to BLL_16
                                               Pegayaman (TT. I0323-008) - Jl. Raya
                                               Gitgit - Buleleng (PO Rp.2.253.300,-
301    18-Apr-23    SINARMAS IDR 0002999994    Potongan PPh 21(3%) Rp.67.599,- )                         2,185,701     2,253,300           -        67,599       2,185,701
                                               JASA KELISTRIKAN INDONESIA, PT, Jasa
                                               pengurusan NIDI dan SLO daya 7700 VA
                                               untuk site Kerobokan Kelod 020 (PO
                                               Rp.700.000,- Potongan PPh 23(2%)
302    18-Apr-23    SINARMAS IDR    0002999994 Rp.14.000,- )                                              686,000       700,000            -        14,000         686,000
                                               JASA KELISTRIKAN INDONESIA, PT, Jasa
                                               pengurusan NIDI dan SLO daya 7700 VA
                                               untuk site Benoa_016, Site
                                               Canggu_007,Site Jimbaran 015 dan Site
                                               Kerobokan Kelod 021(PO Rp.2.800.000,-
303    18-Apr-23    SINARMAS IDR    0002999994 Potongan PPh 23(2%) Rp.56.000,- )                         2,744,000     2,800,000           -        56,000       2,744,000
                                               DUTA HITA JAYA, PT, Tagihan Pelunasan
                                               70% atas Pengadaan Steel Pole 21M
304    20-Apr-23     MANDIRI IDR 1220011559559 sebanyak 10 Set                                         783,188,001   783,188,001           -             -     783,188,001

                                                 DUTA HITA JAYA, PT, Tagihan Pelunasan
                                                 70% atas Pengadaan Temporary Tower
305    26-Apr-23    MANDIRI IDR    1220011559559 Support MP 30M 3 System sebanyak 2 Set                 15,385,903    15,385,903           -             -      15,385,903
                                                 POLA REKAYASA UTAMA, PT, Jasa Analisa
                                                 Dinding Penahan Tanah dan Perbaikan
                                                 Pagar dan Pondasi site 72 / Bukit
306    26-Apr-23    MANDIRI IDR    1220011559559 Tumpeng                                                 2,150,000     2,000,000      220,000       70,000       2,150,000

                                                 POLA REKAYASA UTAMA, PT, Jasa Survey,
                                                 Analisa Capacity, Analisa Strengthening
307    26-Apr-23    MANDIRI IDR    1220011559559 MP 30m site By Pass Nusa Dua                           11,825,000    11,000,000     1,210,000     385,000      11,825,000
                                                 TELCO ABADI JAYA, PT, Pembelia
                                                 Patchcord SM Duplex SC/UPC-SC/UPC
308    26-Apr-23    MANDIRI IDR    1220011559559 2MM 3 M Sebanyak 10 Pcs                                  499,500       450,000        49,500            -         499,500
                                                 TELCO ABADI JAYA, PT, Pembelian Cable
                                                 Grondong BCC Nya 4MM Green-Yellow
                                                 100 Mtr, Optical Splitter Blade 1:8 SC/APC
309    26-Apr-23    MANDIRI IDR    1220011559559 20 Unit, dll                                            8,469,300     7,630,000      839,300            -       8,469,300
Page 35
        TANGGAL      REKENING        NOMOR                                                                                  NILAI YANG DIBAYARKAN
      PENGELUARAN   BANK YANG     REKENING BANK                                                                                                              NET
NO.      DI BANK    DIGUNAKAN         YANG         NAMA VENDOR DAN KETERANGAN             NILAI MUTASI BANK    DPP            PPN           PPh          DIBAYARKAN
                                                KESA UTAMA SEJAHTERA, PT, Tagihan
                                                100% atas Pekerjaan Civil Work Tiang Pole
310    26-Apr-23    MANDIRI IDR   1220011559559 Octagonal Site Dauh Puri Klod-010                 25,625,126   23,455,493     2,580,104     410,471        25,625,126

                                                MAHAGA PRATAMA, PT, Tagihan 100%
                                                atas Pekerjaan Penarikan FO Cut Impact
311    26-Apr-23    MANDIRI IDR   1220011559559 Pekerjaan PU Site MP-Kalideres-001                 2,300,460    2,105,684      231,625       36,849         2,300,460

                                                   MAHAGA PRATAMA, PT, Tagihan 100%
                                                   atas Pekerjaan Penarikan FO Cut Impact
312    26-Apr-23    MANDIRI IDR   1220011559559    Pembangunan Toll Site Jatibening-017           10,021,813    9,173,284     1,009,061     160,532        10,021,813
                                                   MAHAGA PRATAMA, PT, Tagihan 100%
                                                   atas Pekerjaan Rektifikasi FO Ducting
                                                   Impact Pelebaran Jalan Site Marga Jaya-
313    26-Apr-23    MANDIRI IDR   1220011559559    008                                             7,308,480    6,689,684      735,865      117,069         7,308,480
                                                   MAHAGA PRATAMA, PT, Tagihan 100%
                                                   atas Pekerjaan Kabel Power Tanah Impact
                                                   Pembangunan Halte Sarinah Site
314    26-Apr-23    MANDIRI IDR   1220011559559    Gondangdia-001                                  5,642,418    5,164,684      568,115       90,381         5,642,418
                                                   SWARA UTAMA GLOBAL, PT, Tagihan
                                                   100% atas Pekerjaan Dismantle ME
                                                   Telematika & Accessories Telematika
315    26-Apr-23    MANDIRI IDR   1220011559559    14/900 Site Kebon Jeruk-024                     7,865,994    7,259,800      798,578      192,384         7,865,994
                                                   SWARA UTAMA GLOBAL, PT, Tagihan
                                                   100% atas Pekerjaan Additional ME
                                                   Grounding & Accessories Telematika
316    26-Apr-23    MANDIRI IDR   1220011559559    14/900 Site Sunter Jaya-022                     1,101,283    1,016,412      111,805       26,934         1,101,283
                                                   SWARA UTAMA GLOBAL, PT, Tagihan
                                                   100% atas Pekerjaan Additional ME
                                                   Grounding & Accessories Telematika
317    26-Apr-23    MANDIRI IDR   1220011559559    14/900 Site Pisangan Timur-005                  1,101,283    1,016,412      111,805       26,934         1,101,283
                                                   SWARA UTAMA GLOBAL, PT, Tagihan
                                                   100% atas Pekerjaan Additional ME
                                                   Grounding & Accessories Telematika
318    26-Apr-23    MANDIRI IDR   1220011559559    14/900 Site Cakung Timur-007                    1,101,283    1,016,412      111,805       26,934         1,101,283
                                                   SWARA UTAMA GLOBAL, PT, Tagihan
                                                   100% atas Pekerjaan Additional ME
                                                   Grounding & Accessories Telematika
319    26-Apr-23    MANDIRI IDR   1220011559559    14/900 Site Bidara Cina-006                     1,101,283    1,016,412      111,805       26,934         1,101,283
                                                   SWARA UTAMA GLOBAL, PT, Tagihan
                                                   100% atas Pekerjaan Additional ME
                                                   Grounding & Accessories Telematika
320    26-Apr-23    MANDIRI IDR   1220011559559    14/900 Site Limo-004                            1,101,283    1,016,412      111,805       26,934         1,101,283
                                                   SWARA UTAMA GLOBAL, PT, Tagihan
                                                   100% atas Relokasi 1 Pekerjaan Civil Work
                                                   Telematika Tiang Beton 14/900 Site
321    26-Apr-23    MANDIRI IDR   1220011559559    Marga Jaya-003                                 16,980,038   15,671,469     1,723,862     415,293        16,980,038
                                                   SWARA UTAMA GLOBAL, PT, Tagihan
                                                   100% atas Pekerjaan Additional ME
                                                   Grounding & Accessories Telematika
322    26-Apr-23    MANDIRI IDR   1220011559559    14/900 Site Jatimulya-006                       1,101,283    1,016,412      111,805       26,934         1,101,283
                                                   GIGA DATACOM, PT, Tagihan 90% atas
                                                   Pekerjaan Activation For New Services
                                                   Corporate Delivery - PT. Graha Bali
323    26-Apr-23    MANDIRI IDR   1220011559559    Samudera (White Rock Beach Club)               12,215,013   11,180,790     1,229,886     195,663        12,215,013
                                                   ASSALAMAH CAHAYA SAKTI , PT, Tagihan
                                                   90% atas Pekerjaan Penarikan Kabel FO
                                                   Final as Build Kota Bandung - Akses Site
324    26-Apr-23    MANDIRI IDR   1220011559559    RK0004 - Office Bandung                        21,715,211   19,876,623     2,186,428     347,840        21,715,211
                                                   IWAN SOFYAN, Tagihan 100% atas
                                                   Pekerjaan Relokasi site 816769 OPD
325    26-Apr-23    MANDIRI IDR   1220011559559    Disdukcapil Cirebon                             5,792,748    5,941,280           -       148,532         5,792,748

                                                   HANDASA KONSULTAN, PT, DP 40%
                                                   Pekerjaan Jasa Kajian Sertifikat Laik Fungsi
                                                   (SLF) 14 Site di Kabupaten Badung (PO
                                                   Rp.170.940.000,- PPN Rp.6.776.000,-
326    28-Apr-23      BCA IDR      3193058058      Potongan PPh 4(2) 3.5% Rp.2.156.000,- )        61,600,000   61,600,000           -             -        61,600,000

                                                   HANDASA KONSULTAN, PT, PPN DP 40%
                                                   Pekerjaan Jasa Kajian Sertifikat Laik Fungsi
                                                   (SLF) 14 Site di Kabupaten Badung (PO
                                                   Rp.170.940.000,- PPN Rp.6.776.000,-
327    28-Apr-23      BCA IDR      3193058058      Potongan PPh 4(2) 3.5% Rp.2.156.000,- )         6,776,000    6,776,000           -             -         6,776,000

                                                HANDASA KONSULTAN, PT, Potongan PPh
                                                4(2) 3.5% DP 40% Pekerjaan Jasa Kajian
                                                Sertifikat Laik Fungsi (SLF) 14 Site di
                                                Kabupaten Badung (PO Rp.170.940.000,-
                                                PPN Rp.6.776.000,- Potongan PPh 4(2)
328    28-Apr-23      BCA IDR       3193058058  3.5% Rp.2.156.000,- )                      -       2,156,000          -             -      2,156,000 -      2,156,000
                                                PLN PERSERO, PT, Biaya Upgrade Daya
                                                PLN 1 Site Curug Wetan-009 Priority XL -
329    28-Apr-23    MANDIRI IDR   1220011559559 MCP Project                                        6,250,500    6,250,500           -             -         6,250,500
                                                PLN PERSERO, PT, Biaya Upgrade Daya
                                                PLN 1 Site Pasirjaya-001 Priority XL - MCP
330    28-Apr-23    MANDIRI IDR   1220011559559 Project                                            6,704,100    6,704,100           -             -         6,704,100
                                                PLN PERSERO, PT, Biaya Upgrade Daya
                                                PLN 1 Site Ciketingudik-001 Priority XL -
331    28-Apr-23    MANDIRI IDR   1220011559559 MCP Project                                        3,745,700    3,745,700           -             -         3,745,700
Page 36
        TANGGAL      REKENING         NOMOR                                                                                      NILAI YANG DIBAYARKAN
      PENGELUARAN   BANK YANG      REKENING BANK                                                                                                                 NET
NO.      DI BANK    DIGUNAKAN          YANG          NAMA VENDOR DAN KETERANGAN                NILAI MUTASI BANK    DPP             PPN           PPh        DIBAYARKAN
                                                 PLN PERSERO, PT, Biaya Upgrade Daya
                                                 PLN 1 Site Jatake-006 Priority XL - MCP
332    28-Apr-23    MANDIRI IDR    1220011559559 Project                                               9,992,700     9,992,700            -             -       9,992,700
                                                 PLN PERSERO, PT, Biaya Pasang Baru site
                                                 725223 Semanggi 005 Priority XL -
333    28-Apr-23    MANDIRI IDR    1220011559559 Project Microcell Jawa Tengah                         8,474,800     8,474,800            -             -       8,474,800
                                                 PLN PERSERO, PT, Biaya Pasang Baru 3
                                                 site Pabean-001, Panjang Baru-001, &
                                                 Kabunan-001 Priority XL - Project
334    28-Apr-23    MANDIRI IDR    1220011559559 Microcell Jawa Tengah                                25,424,400    25,424,400            -             -      25,424,400

                                                 CIPTA SEDAYU ELEKTRINDO, PT, Tagihan
                                                 100% atas Pekerjaan Pengadaan Sertifikat
335    02-May-23    MANDIRI IDR    1220011559559 Laik Operasi (SLO) 10 Site                            6,712,765     6,158,500       677,435      123,170       6,712,765

                                                 CIPTA SEDAYU ELEKTRINDO, PT, Tagihan
                                                 100% atas Pekerjaan Pengadaan Sertifikat
336    02-May-23    MANDIRI IDR    1220011559559 Laik Operasi (SLO) 10 Site                            6,812,500     6,250,000       687,500      125,000       6,812,500

                                                 CIPTA SEDAYU ELEKTRINDO, PT, Tagihan
                                                 100% atas Pekerjaan Pengadaan Sertifikat
337    02-May-23    MANDIRI IDR    1220011559559 Laik Operasi (SLO) 10 Site                            7,500,290     6,881,000       756,910      137,620       7,500,290

                                                 CIPTA SEDAYU ELEKTRINDO, PT, Tagihan
                                                 100% atas Pekerjaan Pengadaan Sertifikat
338    02-May-23    MANDIRI IDR    1220011559559 Laik Operasi (SLO) 10 Site                            8,183,175     7,507,500       825,825      150,150       8,183,175

                                                 CIPTA SEDAYU ELEKTRINDO, PT, Tagihan
                                                 100% atas Pekerjaan Pengadaan Sertifikat
339    02-May-23    MANDIRI IDR    1220011559559 Laik Operasi (SLO) 10 Site                            8,856,250     8,125,000       893,750      162,500       8,856,250

                                                 CIPTA SEDAYU ELEKTRINDO, PT, Tagihan
                                                 100% atas Pekerjaan Pengadaan Sertifikat
340    02-May-23    MANDIRI IDR    1220011559559 Laik Operasi (SLO) 10 Site                            8,856,250     8,125,000       893,750      162,500       8,856,250

                                                 AREA BADUNG, Akuisisi untuk sewa lahan
                                                 site 751154 Jimbaran-014 seluas 4
                                                 m2,jangka waktu 20 tahun periode April
                                                 2023 - April 2043(PO Rp. 277.777.777,-
341    03-May-23    MANDIRI IDR    1220011559559 Potongan PPh 4(2) 10% Rp.27.777.777,- )             250,000,000   277,777,777            -     27,777,777    250,000,000
                                                 AREA BADUNG, Akuisisi untuk sewa lahan
                                                 site 751150 Mekar Bhuana_002 01
                                                 seluas 4 m2,jangka waktu 15 tahun
                                                 periode pril 2023-april 2038(PO Rp.
                                                 241.666.666,- Potongan PPh 4(2) 10%
342    03-May-23    MANDIRI IDR    1220011559559 Rp.24.166.666,- )                                   217,500,000   241,666,666            -     24,166,666    217,500,000

                                                 AREA BADUNG, Akuisisi untuk sewa lahan
                                                 site 751208 Site Kuta-025 seluas 4
                                                 m2,jangka waktu 10 tahun periode April
                                                 2023-april 2033(PO Rp. 177.777.777,-
343    04-May-23    MANDIRI IDR    1220011559559 Potongan PPh 4(2) 10% Rp.17.777.777,- )             160,000,000   177,777,777            -     17,777,777    160,000,000

                                                 NATA JAYA ELEKTRO, PT, Tagihan 90%
                                                 biaya pekerjaan pemindahaan perangkat
                                                 tenant DPS 03 batanta to Dauh Puri Kelod
                                                 010 (PO Rp.75.881.238,- PPN
                                                 Rp.6.767.786,- Potongan PPh 4(2) 1.75%
344    04-May-23    MANDIRI IDR    1220011559559 Rp.1.076.693,- )                                     67,216,421    61,525,328     6,767,786     1,076,693     67,216,421
                                                 TOTAL ABADI INNOVATION, PT, Biaya
                                                 Perbaikan Site M 201 Padma Utara (PO
                                                 Rp.16.142.899,- PPN Rp.1.599.747,-
345    04-May-23    MANDIRI IDR    1220011559559 Potongan PPh 4(2) 4% Rp.581.726,- )                  15,561,173    14,543,152   1,599,747.00     581,726      15,561,173
                                                 SWARA UTAMA GLOBAL, PT, Tagihan
                                                 100% atas Pekerjaan Additional ME
                                                 Grounding & Accessories Telematika
346    04-May-23    MANDIRI IDR    1220011559559 14/900 Site Curug-001                                 1,101,283     1,016,412       111,805       26,934       1,101,283

                                                 CIPTA SEDAYU ELEKTRINDO, PT, Tagihan
                                                 100% atas Pekerjaan Pengadaan Sertifikat
                                                 Laik Operasi & NIDI 2 Site Rusunawa
347    04-May-23    MANDIRI IDR    1220011559559 Cengkareng & Pulo Gebang RW08                          981,981       900,900         99,099       18,018         981,981

                                                 HANDASA KONSULTAN, PT, Termin II 40%
                                                 untuk Jasa Pengurusan Sertifikat Laik
                                                 Fungsi (SLF) 13 Site di wilayah Kabupaten
                                                 Badung dan Kabupaten Gianyar (PO
                                                 Rp.158.730.000,- PPN Rp.6.292.000,-
348    05-May-23    MANDIRI IDR    1220011559559 Potongan PPh 4(2) 3.5% Rp.2.002.000,-)               61,490,000    57,200,000     6,292,000     2,002,000     61,490,000
                                                 PLN PERSERO, PT, Biaya Pasang Baru 1
                                                 site 720049 Miroto-006 Priority XL -
349    05-May-23    MANDIRI IDR    1220011559559 Project Microcell Jawa Tengah                         8,474,800     8,474,800            -             -       8,474,800

                                                   BIBIT, Mr, Biaya perbaikan Pole dan Jalur
                                                   FO BLL Sec 1 dan BLL sec 2 Jln Denpasar
                                                   Singaraja ? Tabanan (PO Rp.3.620.347,-
350    08-May-23    SINARMAS IDR    0002999994     Potongan PPh 21(3%) Rp.108.610,- )                  3,511,737     3,620,347            -       108,610       3,511,737
                                                   BIBIT, Mr, Biaya relokasi Pole P7_25 FO
                                                   DPS 02 to Sukawati 002 Jln. WR
                                                   Supratman Denpasar (PO Rp.1.494.147,-
351    08-May-23    SINARMAS IDR    0002999994     Potongan PPh 21(3%) Rp.44.824,- )                   1,449,323     1,494,147            -        44,824       1,449,323
Page 37
        TANGGAL      REKENING         NOMOR                                                                                      NILAI YANG DIBAYARKAN
      PENGELUARAN   BANK YANG      REKENING BANK                                                                                                                NET
NO.      DI BANK    DIGUNAKAN          YANG            NAMA VENDOR DAN KETERANGAN             NILAI MUTASI BANK     DPP            PPN           PPh        DIBAYARKAN
                                                    IMAM TAUFIK, Biaya pekerjaan perbaikan
                                                    pole P7_22 FO Aksess M 181 Rock Bar Jln.
                                                    Tegal Wangi Kuta Selatan, Badung(PO
                                                    Rp.2.540.107,- Potongan PPh 21(3%)
352    08-May-23    SINARMAS IDR    0002999994      Rp.76.203,- )                                      2,463,904     2,540,107           -        76,203       2,463,904
                                                    IMAM TAUFIK, Biaya relokasi pole
                                                    P7_163#4 dan P7_164#4 Link MCP
                                                    750627 to MCP 750654 Jln. Udayana-
                                                    Gianyar (PO Rp.1.800.387,- Potongan PPh
353    08-May-23    SINARMAS IDR    0002999994      2193%) Rp.54.012,- )                               1,746,375     1,800,387           -        54,012       1,746,375
                                                    PLN PERSERO, PT, Biaya Upgrade Daya
                                                    PLN 1 Site Duri Kosambi-027 Priority XL -
354    08-May-23    MANDIRI IDR    1220011559559    MCP Project                                        6,250,500     6,250,500           -             -       6,250,500
                                                    PLN PERSERO, PT, Biaya Upgrade Daya
                                                    PLN Site Duri Kosambi-031 Priority XL -
355    08-May-23    MANDIRI IDR    1220011559559    MCP Project                                        6,250,500     6,250,500           -             -       6,250,500
                                                    PLN PERSERO, PT, Biaya Upgrade Daya
                                                    PLN 1 Site Ciracas-006 Priority XL - MCP
356    08-May-23    MANDIRI IDR    1220011559559    Project                                            6,250,500     6,250,500           -             -       6,250,500
                                                    PLN PERSERO, PT, Biaya Upgrade Daya
                                                    PLN 1 Site Kebayoran Lama Utara-004
357    08-May-23    MANDIRI IDR    1220011559559    Priority XL - MCP Project                          6,250,500     6,250,500           -             -       6,250,500
                                                    PLN PERSERO, PT, Biaya Upgrade Daya
                                                    PLN 1 Site Buaran Indah-005 Priority XL -
358    08-May-23    MANDIRI IDR    1220011559559    MCP Project                                        6,250,500     6,250,500           -             -       6,250,500
                                                    NOBI PUTRA ANGKASA, PT, Tagihan 100%
                                                    atas Pengadaan Panel Modular ACPDB
359    09-May-23    MANDIRI IDR    1220011559559    Outdoor sebanyak 5 Unit                            8,452,650     7,615,000    837,650.00           -       8,452,650
                                                    NOBI PUTRA ANGKASA, PT, Tagihan 100%
                                                    atas Pengadaan Box KWH Meter 1 Phase
360    09-May-23    MANDIRI IDR    1220011559559    sebanyak 40 Unit                                  35,520,000    32,000,000     3,520,000           -      35,520,000
                                                    NOBI PUTRA ANGKASA, PT, Tagihan 100%
                                                    atas Pengadaan ODC 64U Rack 19 Inch
                                                    sebanyak 5 Unit dan Modular ACPDB
361    09-May-23    MANDIRI IDR    1220011559559    DCPDB 3 Phase sebanyak 5 Unit                    218,670,000   197,000,000    21,670,000           -     218,670,000
                                                    NOBI PUTRA ANGKASA, PT, Tagihan 100%
                                                    atas Pengadaan Material Requirement
                                                    Add Work ME ODC 15U dan Instalasi
362    09-May-23    MANDIRI IDR    1220011559559    sebanyak 3 Set                                     1,275,300     1,170,000      128,700       23,400       1,275,300
                                                    KESA UTAMA SEJAHTERA, PT, Tagihan
                                                    90% Pekerjaan Penarikan Kabel Udara 24
                                                    core - FO Link GNY_77 Samu Singapadu to
                                                    Site_37 Samu (PO Rp.35.620.853,- PPN
                                                    Rp.3.176.995,- Potongan PPh 4(2) 1.75%
363    10-May-23    MANDIRI IDR    1220011559559    Rp.505.431,- )                                    31,553,337    28,881,773     3,176,995     505,431      31,553,337
                                                    KESA UTAMA SEJAHTERA, PT, Tagihan
                                                    90% atas Pekerjaan Instalasi Tiang & ME
                                                    Grounding & Accessories Pole Octagonal
364    10-May-23    MANDIRI IDR    1220011559559    21M Site Dauh Puri Klod-010                       27,830,907    25,474,515     2,802,196     445,804      27,830,907
                                                    MONETI INDO TEKNO, PT, Pembelian SFP
                                                    FTLF 1318P3BTL 1 Gbps 10 KM Finisar 5
                                                    Pcs, SFP FCLF 8521P2BTL Cooper 1 Gbps
                                                    10 KM Finisar 5 Pcs untuk Spare Tower
365    10-May-23    MANDIRI IDR    1220011559559    Operation                                         11,544,000    10,400,000     1,144,000           -      11,544,000

                                               AREA BADUNG, Akuisisi untuk sewa lahan
                                               site 751156 Jimbaran_016 seluas 4
                                               m2,jangka waktu 10 tahun periode Mei
                                               2023-Mei 2033 (PO Rp.166.666.666,-
366    12-May-23     MANDIRI IDR 1220011559559 Potongan PPh 4(2) 10% Rp.16.666.666 )                150,000,000    166,666,666           -     16,666,666    150,000,000
                                               JASA KELISTRIKAN INDONESIA, PT,
                                               Pengurusan NIDI dan SLO Daya 7.700 VA
                                               Site Seminyak-001 (PO Rp.700.000,-
367    12-May-23    SINARMAS IDR   0002999994  Potongan PPh 23(2%) Rp.14.000,- )                        686,000       700,000            -        14,000         686,000

                                                 POLA REKAYASA UTAMA, PT, Jasa Survey,
                                                 Analisa Capacity, Analisa Pondasi, Analisa
                                                 Strengthening, dan Perkuatan Foundation
368    12-May-23    MANDIRI IDR    1220011559559 site Sanggar Buana - LP Radome 20m                  11,825,000     11,000,000     1,210,000     385,000      11,825,000

                                                    POLA REKAYASA UTAMA, PT, Jasa Survey,
                                                    Analisa Capacity, Analisa Strengthening,
                                                    dan Perkuatan Foundation site Pasar Ikan
369    12-May-23    MANDIRI IDR    1220011559559    Kedonganan - LP Radome 20m                       11,825,000     11,000,000     1,210,000     385,000      11,825,000
                                                    MAHAGA PRATAMA, PT, Tagihan 100%
                                                    atas Pekerjaan Rektifikasi FO &
                                                    Pemasangan Accessories Site Jovis SF
370    12-May-23    MANDIRI IDR    1220011559559    Batch 7 Site MP-Semper Timur-001                 16,603,252     15,197,484     1,671,723     265,955      16,603,252
                                                    MAHAGA PRATAMA, PT, Tagihan 100%
                                                    atas Pekerjaan FO Cut Restorasi Link
                                                    Impact Pembangunan Tower Sutet Site
371    12-May-23    MANDIRI IDR    1220011559559    MP-Semper Timur-001                              11,427,205     10,459,684     1,150,565     183,044      11,427,205
                                                    PLN PERSERO, PT, Biaya Upgrade Daya
                                                    PLN Site Paledang-001 Priority XL - MCP
372    15-May-23    MANDIRI IDR    1220011559559    Project                                           9,992,700      9,992,700           -             -       9,992,700
                                                    MEDIA FIROPTIX NUSANTARA, PT,
                                                    Tagihan Retensi 10% atas Pekerjaan
                                                    Penarikan Kabel FO 24 & 96 Core - Tsel
                                                    RNC TAB_033 New Tabanan Main Link &
373    16-May-23    MANDIRI IDR    1220011559559    Redundant Link                                   74,035,458     69,192,017     7,611,121    2,767,680     74,035,458
Page 38

          
Page 39
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Modal Kerja


       TANGGAL
     PENGELUARAN                        NOMOR REKENING
        DI BANK  REKENING BANK            BANK YANG                                                                 NILAI MUTASI                   NILAI YANG DIBAYARKAN
 NO.  STATEMENT YANG DIGUNAKAN            DIGUNAKAN                   NAMA VENDOR DAN KETERANGAN                       BANK          DPP           PPN             PPh       NET DIBAYARKAN
                                                            SERPONG CIPTA KREASI, PT, Biaya atas Pemakaian
  1     16-Dec-22        MANDIRI          1220011559559     Listrik di Gedung Serpong M-Town Residence                  1,126,231     1,115,079     122,659        111,507         1,126,231
                                                            SERPONG CIPTA KREASI, PT, Biaya atas Pemakaian
  2     16-Dec-22        MANDIRI          1220011559559     Listrik di Gedung Serpong M-Town Residence                  1,106,252     1,095,298     120,483        109,529         1,106,252
                                                            LINK NET TBK, PT, Link Net IDC D3 Jakarta to NIX Bali
  3     16-Dec-22        MANDIRI          1220011559559     B00573-009 10Gbps periode Nov 2022                        201,650,000   185,000,000   20,350,000     3,700,000       201,650,000

                                                            LINK NET TBK, PT, Sewa Crossconnect 10 Mbps Fiber
  4     16-Dec-22        MANDIRI          1220011559559     Optic Tenant PT. Bank Keb Hana periode Okt 2022             9,810,000     9,000,000     990,000        180,000         9,810,000

                                                            LINK NET TBK, PT, Sewa Crossconnect 10 Mbps Fiber
  5     16-Dec-22        MANDIRI          1220011559559     Optic Tenant PT. Bank Keb Hana periode Okt 2022             2,725,000     2,500,000     275,000         50,000         2,725,000
                                                            INDONESIA COMNETS PLUS, PT, Sewa Local Loop 5
  6     16-Dec-22        MANDIRI          1220011559559     Mbps Diskominfo Kab. Purwakarta Warudoyong                 12,304,610    11,288,632    1,241,750       225,772        12,304,610
                                                            AP FIELD OPERATION & OPTIMIZING, Kompensasi
                                                            Listrik Project Jakwifi Batch 3 ( 227 AP-227 Warga)
  7     16-Dec-22       SINARMAS           0000240408       Tahap ke 5 periode 2022-2023                               46,900,000    46,900,000          -             -          46,900,000
                                                            BALI PECATU GRAHA, PT, Pembayaran tagihan listrik
                                                            dan IPL BPG Bulan Desember 2022 (Pemakaian bulan
  8     19-Dec-22       SINARMAS           00002999994      November 2022)                                             12,853,138    12,853,138          -             -          12,853,138
                                                            I WAYAN SELAMET, SH, Biaya penyusunan akta
  9     19-Dec-22       SINARMAS           00002999994      Perjanjian perpanjangan sewa lahan site 51 Pelaga           1,400,000     1,435,897          -          35,897         1,400,000
                                                            NI PUTU DHIAN IRMASARI, SH.,M.Kn, Mrs., Biaya
                                                            penyusunan akta perjanjian perpanjangan sewa
 10     19-Dec-22       SINARMAS           00002999994      lahan site 10 Pura Selonding                                1,500,000     1,538,462          -          38,462         1,500,000
                                                            BIBIT, Mr, Pekerjaan Perbaikan Kabel Landai di
                                                            Cluster Banjar Kertha Graha, Sekar Tunjung dan
                                                            Perbaikan Tiang Miring dan pondasi pecah Kantor
 11     19-Dec-22       SINARMAS           00002999994      Camat Mengwi                                                1,286,812     1,326,610          -          39,798         1,286,812
                                                            SMARTFREN TELECOM TBK, PT, Internet Bandwith 31
 12     20-Dec-22        MANDIRI          1220011559559     site @50 Mbps (I: 8000001058)                             929,070,000   837,000,000   92,070,000           -         929,070,000
                                                            SMARTFREN TELECOM TBK, PT, Internet Bandwith 31
 13     20-Dec-22        MANDIRI          1220011559559     site @50 Mbps (I: 8000001058)                              89,910,000    81,000,000    8,910,000           -          89,910,000
                                                            SMARTFREN TELECOM TBK, PT, Internet Bandwith 31
 14     20-Dec-22        MANDIRI          1220011559559     site @50 Mbps (I: 8000001058)                              29,970,000    27,000,000    2,970,000           -          29,970,000
                                                            FIBER NETWORKS INDONESIA, PT, Sewa Local Loop
                                                            30 Mbps - Pergudangan Puninar Yusen Periode 17
 15     20-Dec-22        MANDIRI          1220011559559     Mei 2022 sd. 31 Okt 2022                                   23,909,678    21,935,484    2,412,903       438,709        23,909,678
                                                            FIBER NETWORKS INDONESIA, PT, Sewa Local Loop
                                                            30 Mbps - Pergudangan Puninar Yusen Periode 17
 16     20-Dec-22        MANDIRI          1220011559559     Mei 2022 sd. 31 Okt 2022                                    4,360,000     4,000,000     440,000         80,000         4,360,000
                                                            PLN PERSERO, PT, Pengajuan Token Pulsa Listrik
 17     20-Dec-22        MANDIRI          1220011559559     Phase 21 Periode Desember 2022                            217,257,000   217,257,000          -             -         217,257,000
                                                            DITJEN POSTEL, BHP Frekuensi Periode 31 Desember
                                                            2022 s.d 30 Desember 2023 - No. Aplikasi :
 18     21-Dec-22        MANDIRI          1220011559559     2487452122021                                              14,102,124    14,102,124          -             -          14,102,124
                                                            TELEKOMUNIKASI SELULAR, PT, Biaya pengisian top
 19     21-Dec-22        MANDIRI          1220011559559     up paket data mikrotik                                       102,000       102,000           -             -             102,000
                                                            TELEKOMUNIKASI SELULAR, PT, Biaya pengisian top
 20     21-Dec-22        MANDIRI          1220011559559     up paket data mikrotik                                       100,000       100,000           -             -             100,000

 21     21-Dec-22        MANDIRI          1220011559559     XL AXIATA TBK, PT, Biaya pengisian top up paket data           61,500       61,500           -             -              61,500
 22     21-Dec-22        MANDIRI          1220011559559     PLN PERSERO, PT, Biaya pengisian Token Listrik PLN             53,500       53,500           -             -              53,500
                                                            DPO FPU, Biaya Jaminan Pelaksanaan Pekerjaan
                                                            Perpanjangan Sewa Jaringan Komunikasi Wide Area
                                                            Network (WAN) BNI Pejompongan Periode Tahun
 23     21-Dec-22        MANDIRI          1220011559559     2022- 2025                                                  2,250,000     2,250,000          -             -           2,250,000
                                                            EQUINIX SINGAPORE PTE LTD, Biaya Sewa Rack
                                                            Colocation dan Interkoneksi Equinix Singapore
 24     21-Dec-22       SINARMAS           0000240408       periode Nov 2022                                          108,581,764   108,581,764          -             -         108,581,764
                                                            DPO FPU, Biaya pengisian token PLN atas 3 site Pluit-
 25     21-Dec-22        MANDIRI          1220011559559     024, Halim Perdana Kusuma-007                                900,000       900,000           -             -             900,000
                                                            AP FIELD OPERATION & OPTIMIZING, Uang Muka
                                                            Beban Umum atas Kompensasi Listrik Warga Project
                                                            Jakwifi Batch 2 ( 748 Pole - Penerima Kompensasi
 26     21-Dec-22       SINARMAS           0000240408       783 Warga ) Tahap ke 7 periode 2023                       136,500,000   136,500,000          -             -         136,500,000
                                                            I WAYAN SELAMET, SH, Biaya penyusunan akta
 27     21-Dec-22       SINARMAS           0002999994       perjanjian perpanjangan sewa lahan site 37 Samu             1,000,000     1,025,641          -          25,641         1,000,000
                                                            I WAYAN SELAMET, SH, Biaya penyusunan akta
                                                            perpanjangan perjanjian sewa lahan site 31 Werdhi
 28     21-Dec-22       SINARMAS           00002999994      Bhuana                                                      1,250,000     1,282,051          -          32,051         1,250,000
                                                            BIBIT, Mr, Biaya Pekerjaan Perbaikan Kabel FO - Link
 29     21-Dec-22       SINARMAS           00002999994      M_187 Villa Puri Canggu                                     1,841,824     1,898,788          -          56,964         1,841,824
                                                            IMAM TAUFIK, Biaya Pekerjaan Perbaikan FO Cut
                                                            Link Backbone Site_31 Werdhi Buana to BLL_08
 30     21-Dec-22       SINARMAS           00002999994      Beratan Section 2                                           2,037,532     2,100,548          -          63,016         2,037,532

                                                            MULIA INTIPELANGI, PT, Biaya atas Pemakaian Listrik
 31     22-Dec-22          BCA             3193058058       Mall Taman Anggrek (GL-L5) Periode Nov 2022                 3,873,700     3,835,346     421,888        383,534         3,873,700
                                                            SERPONG CIPTA KREASI, PT, Biaya atas Pemakaian
                                                            Listrik di Gedung Serpong M-Town Residence Periode
 32     22-Dec-22          BCA             3193058058       November 2022                                               1,086,803     1,076,042     118,365        107,604         1,086,803
                                                            SERPONG CIPTA KREASI, PT, Biaya atas Pemakaian
                                                            Listrik di Plaza Summarecon Serpong periode Nov
                                                            2022, Biaya atas Pemakaian Listrik di Plaza
 33     22-Dec-22          BCA             3193058058       Summarecon Serpong periode Oct 2022                          998,398       988,513      108,736         98,851           998,398
                                                            SERPONG CIPTA KREASI, PT, Biaya atas Pemakaian
                                                            Listrik di Plaza Summarecon Serpong periode Nov
                                                            2022, Biaya atas Pemakaian Listrik di Plaza
 34     22-Dec-22          BCA             3193058058       Summarecon Serpong periode Oct 2022                          951,473       942,052      103,626         94,205           951,473
Page 40
      TANGGAL
    PENGELUARAN                 NOMOR REKENING
       DI BANK  REKENING BANK     BANK YANG                                                              NILAI MUTASI                 NILAI YANG DIBAYARKAN
NO.  STATEMENT YANG DIGUNAKAN     DIGUNAKAN                NAMA VENDOR DAN KETERANGAN                       BANK         DPP          PPN             PPh       NET DIBAYARKAN
                                                 GRIYA MURIA KENCANA, PT, Biaya atas Pemakaian
                                                 Listrik di Gedung Prince Center periode 26 Okt 2022 -
35    22-Dec-22     BCA           3193058058     25 Nov 2022                                                  737,300      730,000      80,300         73,000           737,300
                                                 SUMMARECON AGUNG, PT, Biaya atas Pemakaian
                                                 Listrik di The Springlake Apartement periode Nov
36    22-Dec-22     BCA           3193058058     2022                                                         540,928      535,687      57,646         52,405           540,928
                                                 GRIYA MURIA KENCANA, PT, Biaya atas Pemakaian
                                                 Listrik di Gedung Prince Center periode 26 Okt 2022 -
37    22-Dec-22     BCA           3193058058     25 Nov 2022                                                  234,463      232,141      25,536         23,214           234,463
                                                 KHARISMA INTAN PROPERTI, PT, Biaya atas
                                                 Pemakaian Listrik di Scientia Business Park periode
38    22-Dec-22     BCA           3193058058     Oct 2022                                                     181,340      179,544      19,750         17,954           181,340
                                                 SUMMARECON AGUNG, PT, Biaya atas Pemakaian
39    22-Dec-22     BCA           3193058058     Listrik di The Kensington periode November 2022              168,600      166,975      17,868         16,243           168,600
                                                 PPPSRSS SAHID SUDIRMAN CENTER, Tagihan
                                                 Revenue Sharing Bali Fiber di Sahid Sudirman Center
40    22-Dec-22    MANDIRI       1220011559559   periode April 2022 - Juni 2022                             23,328,246   23,097,273   2,540,700     2,309,727        23,328,246
                                                 BANGUNMUSTIKA INTIPERSADA, PT, Biaya atas
                                                 Pemakaian Listrik di ITC Cipulir Mas Lt 4/F.035 (IKR)
41    22-Dec-22    MANDIRI       1220011559559   Periode 18 Oktober 2022 - 17 November 2022                 13,648,141   15,164,601         -       1,516,460        13,648,141
                                                 NUSA KIRANA REAL ESTATE, PT, Biaya Sewa
                                                 Penempatan Perangkat Telekomunikasi di Gedung
                                                 Kirana Boutique Berdasarkan Penggunaan Jaringan
42    22-Dec-22    MANDIRI       1220011559559   Internet periode November - Desember 2022                   9,241,500    9,150,000   1,006,500       915,000         9,241,500
                                                 RULLY JATI WIBAWA, Uang Muka Beban Umum atas
                                                 Jasa Pembuatan Video Konten Motion Marketing
43    22-Dec-22    MANDIRI       1220011559559   Balifiber (30 Hari) - December 2022                         8,580,000    8,580,000         -             -           8,580,000
                                                 FREIGHT LINER INDONESIA, PT, Biaya Pengiriman
                                                 Material Access Point Lite-On O-90 sebanyak
44    22-Dec-22    MANDIRI       1220011559559   1.647Pcs dari Taiwan ke Jakarta                             5,355,706    5,355,706     62,150         62,150         5,355,706

                                                 PERHIMPUNAN PENGHUNI GEDUNG PERKANTORAN
                                                 KIRANA TWO, Biaya Sewa Penempatan Perangkat
                                                 Telekomunikasi di Gedung Kirana Two Berdasarkan
45    22-Dec-22    MANDIRI       1220011559559   Profit Sharing periode Juli - September 2022                5,351,225    5,945,806         -         594,581         5,351,225
                                                 GRAHA MENARA HIJAU, PT, Biaya Sewa Penempatan
                                                 Perangkat Telekomunikasi di Gedung Menara Hijau
                                                 berdasarkan Profit Sharing periode Juli - September
46    22-Dec-22    MANDIRI       1220011559559   2022                                                        4,538,980    4,494,039    494,344        449,403         4,538,980
                                                 PRABA KUMALA SAJATI, PT, Biaya Management Fee
                                                 atas Revenue Sharing periode November 2021 - April
47    22-Dec-22    MANDIRI       1220011559559   2022 di Gedung Park23 Bali Mall                             2,783,813    2,756,250    303,188        275,625         2,783,813
                                                 BANGUNMUSTIKA INTIPERSADA, PT, Biaya atas
                                                 Pemakaian Listrik di ITC Cipulir Mas Lt 4/F.035 (IKR)
48    22-Dec-22    MANDIRI       1220011559559   Periode 18 Oktober 2022 - 17 November 2022                  1,907,751    2,119,723         -         211,972         1,907,751
                                                 XL AXIATA TBK, PT, Biaya Tagihan Pasca Bayar
                                                 Pembelian Pulsa XL Mikrotik (Monitoring NOC)
                                                 Periode November 2022 (Pemakaian Oktober 2022-
49    22-Dec-22    MANDIRI       1220011559559   Jabodetabek Area (10 Site)                                  1,010,100     910,000     100,100            -           1,010,100
50    22-Dec-22    MANDIRI       1220011559559   MAKMUR ORIENT JAYA, PT, Biaya Pemakaian Listrik               551,230     545,772      60,035         54,577           551,230
51    22-Dec-22    MANDIRI       1220011559559   MAKMUR ORIENT JAYA, PT, Biaya Pemakaian Listrik               474,537     469,838      51,682         46,983           474,537
52    22-Dec-22    MANDIRI       1220011559559   MAKMUR ORIENT JAYA, PT, Biaya Pemakaian Listrik               334,412     331,101      36,421         33,110           334,412
                                                 MENARA THAMRIN, PT, Biaya atas Pemakaian Listrik
                                                 di Gedung Menara Thamrin Suite 21 & 6 periode
53    22-Dec-22    MANDIRI       1220011559559   Oktober 2022                                                 209,513      207,438      22,818         20,743           209,513
                                                 PERMADANI PROPERTINDO DEVELOPMENT, PT,
                                                 Biaya atas Pemakaian Listrik di Wisma Kodel periode
54    22-Dec-22    MANDIRI       1220011559559   Okt 2022                                                     205,030      203,000      22,330         20,300           205,030
55    22-Dec-22    MANDIRI       1220011559559   MAKMUR ORIENT JAYA, PT, Biaya Pemakaian Listrik              175,336      173,600      19,096         17,360           175,336
56    22-Dec-22    MANDIRI       1220011559559   MAKMUR ORIENT JAYA, PT, Biaya Pemakaian Listrik              161,762      160,160      17,618         16,016           161,762
                                                 SMART TELECOM, PT, Tagihan Telepon Divisi Call
                                                 Center, Product & Marketing dan FTTx Opr Bulan Nov
57    22-Dec-22    MANDIRI       1220011559559   2022                                                         157,374      141,778      15,596            -             157,374
58    22-Dec-22    MANDIRI       1220011559559   MAKMUR ORIENT JAYA, PT, Biaya Pemakaian Listrik              151,308      149,810      16,479         14,981           151,308
59    22-Dec-22    MANDIRI       1220011559559   MAKMUR ORIENT JAYA, PT, Biaya Pemakaian Listrik              136,960      135,604      14,916         13,560           136,960
60    22-Dec-22    MANDIRI       1220011559559   MAKMUR ORIENT JAYA, PT, Biaya Pemakaian Listrik              104,552      103,516      11,387         10,351           104,552
                                                 MENARA CAPITAL INDONUSA, PT, Biaya atas
                                                 Pemakaian Listrik Gedung Palma Tower lt. B1
61    22-Dec-22    MANDIRI       1220011559559   periode Nov 2022                                             103,048      102,027      11,223         10,202           103,048
                                                 MENARA CAPITAL INDONUSA, PT, Biaya atas
                                                 Pemakaian Listrik Gedung Palma Tower lt. B1
62    22-Dec-22    MANDIRI       1220011559559   periode Nov 2022                                             103,048      102,027      11,223         10,202           103,048
                                                 SMARTFREN TELECOM TBK, PT, Tagihan Telepon
                                                 Divisi Call Center dan Product & Marketing Bulan Nov
63    22-Dec-22    MANDIRI       1220011559559   2022                                                           99,089      89,269       9,820            -              99,089
                                                 FREIGHT LINER INDONESIA, PT, Biaya Pengiriman
                                                 Material Access Point Lite-On O-90 sebanyak
64    22-Dec-22    MANDIRI       1220011559559   1.647Pcs dari Taiwan ke Jakarta                            18,977,650   19,150,000    210,650        383,000        18,977,650
                                                 INTERNETINDO DATA CENTRA INDONESIA, PT, Sewa
                                                 Crossconnect 3D 6 UTP dan 3D 3 FO periode Nov
65    22-Dec-22      BCA          3193058058     2022                                                        3,597,000    3,300,000    363,000         66,000         3,597,000
                                                 WAHANA MULTI LOGISTIK, PT, Biaya Pengiriman
                                                 Material Kabel 12 & 32 Core dari PT Furukawa ke PT
66    22-Dec-22    MANDIRI       1220011559559   Rosalindo Bhatara Sakti                                     1,436,950    1,450,000     15,950         29,000         1,436,950
                                                 WAHANA MULTI LOGISTIK, PT, Biaya Pengiriman
                                                 Material Kabel 12 & 32 Core dari PT Furukawa ke PT
67    22-Dec-22    MANDIRI       1220011559559   Rosalindo Bhatara Sakti                                      594,600      600,000       6,600         12,000           594,600
                                                 CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                 Material Switch, Modular, Battery dari WH Serpong
68    22-Dec-22    MANDIRI       1220011559559   ke WH Penjernihan                                            495,500      500,000       5,500         10,000           495,500
                                                 CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                 Material Switch, Modular, Battery dari WH Serpong
69    22-Dec-22    MANDIRI       1220011559559   ke WH Penjernihan                                            495,500      500,000       5,500         10,000           495,500
Page 41
      TANGGAL
    PENGELUARAN                 NOMOR REKENING
       DI BANK  REKENING BANK     BANK YANG                                                             NILAI MUTASI                  NILAI YANG DIBAYARKAN
NO.  STATEMENT YANG DIGUNAKAN     DIGUNAKAN              NAMA VENDOR DAN KETERANGAN                        BANK          DPP          PPN             PPh       NET DIBAYARKAN
                                                 PERSADA BATAVIA MANDIRI, PT, Biaya Pengiriman
                                                 Material Relokasi SJUT Jl. Mampang Prapatan dari PT
70    22-Dec-22      BCA          3193058058     Prysmian Cable ke PT Kaliabang Jaya Pratama                 495,500       500,000       5,500         10,000           495,500
                                                 WAHANA MULTI LOGISTIK, PT, Biaya Pengiriman
                                                 Material Kabel 12 & 32 Core dari PT Furukawa ke PT
71    22-Dec-22    MANDIRI       1220011559559   Rosalindo Bhatara Sakti                                     495,500       500,000       5,500         10,000           495,500
                                                 SUBURMITRA GRAFISTAMA, PT, Pembelian Sticker
                                                 Tambahan Site id-site Mame 10,5 x 14,8 cm
                                                 Sebanyak 4.132 Pcs, Sticker Utama 10,5 x 14,8 cm
72    22-Dec-22     BCA           3193058058     Sebanyak 6.120 Pcs                                        15,593,540    14,306,000   1,573,660       286,120        15,593,540
                                                 BENTENG ANUGERAH ASIH, PT, Biaya Pengiriman
                                                 Material Kabel 42 Core & Subduct dari WH Serpong
73    22-Dec-22     BCA           3193058058     ke PT Kaliabang Jaya Pratama                               9,810,900     9,900,000    108,900        198,000         9,810,900
                                                 BENTENG ANUGERAH ASIH, PT, Biaya Pengiriman
                                                 Material Kabel 42 Core & Subduct dari WH Serpong
74    22-Dec-22     BCA           3193058058     ke PT Kaliabang Jaya Pratama                               4,459,500     4,500,000     49,500         90,000         4,459,500
                                                 BENTENG ANUGERAH ASIH, PT, Biaya Pengiriman
                                                 Material Kabel 42 Core & Subduct dari WH Serpong
75    22-Dec-22     BCA           3193058058     ke PT Kaliabang Jaya Pratama                               3,666,700     3,700,000     40,700         74,000         3,666,700
                                                 PERSADA BATAVIA MANDIRI, PT, Biaya Pengiriman
                                                 Material Relokasi SJUT Jl. Mampang Prapatan dari PT
76    22-Dec-22     BCA           3193058058     Prysmian Cable ke PT Kaliabang Jaya Pratama                1,189,200     1,200,000     13,200         24,000         1,189,200
                                                 PERSADA BATAVIA MANDIRI, PT, Biaya Pengiriman
                                                 Material Relokasi SJUT Jl. Mampang Prapatan dari PT
77    22-Dec-22     BCA           3193058058     Prysmian Cable ke PT Kaliabang Jaya Pratama                 941,450       950,000      10,450         19,000           941,450
                                                 ANGKUT TEKNOLOGI INDONESIA, PT, Driver
                                                 Reimbursement Pengiriman Barang Melalui Aplikasi
78    22-Dec-22     BCA           3193058058     Deliveree periode Nov 2022                                  414,992       380,726      41,880          7,614           414,992
                                                 CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                 Material Switch, Modular, Battery dari WH Serpong
79    22-Dec-22    MANDIRI       1220011559559   ke WH Penjernihan                                           743,250       750,000       8,250         15,000           743,250
                                                 CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                 Material Switch, Modular, Battery dari WH Serpong
80    22-Dec-22    MANDIRI       1220011559559   ke WH Penjernihan                                           594,600       600,000       6,600         12,000           594,600
                                                 CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                 Material Switch, Modular, Battery dari WH Serpong
81    22-Dec-22    MANDIRI       1220011559559   ke WH Penjernihan                                           594,600       600,000       6,600         12,000           594,600
                                                 BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
82    22-Dec-22    MANDIRI       1220011559559   FO Cut Site Kembangan Utara-022                            1,238,526     1,338,947         -         100,421         1,238,526

                                                 INFRASTRUKTUR BISNIS SEJAHTERA, PT, Jasa Penguat
                                                 Sinyal untuk Tenant di Gedung The Plaza Shopping
83    23-Dec-22    MANDIRI       1220011559559   Center Berdasarkan Profit Sharing Oktober 2022            21,645,000    19,500,000   2,145,000           -          21,645,000
                                                 PRATAMA INTI SORSING, PT, Reimbursement Insentif
                                                 Outsource Div. Direct Sales Regional Bali periode
84    23-Dec-22    MANDIRI       1220011559559   Sept 2022                                                  5,855,877     5,817,096     47,399          8,618         5,855,877

                                                 SUKA DUKA RAYA KAMPIAL, Biaya Management Fee
                                                 atas Revenue Sharing periode Oktober 2022 di Suka
85    23-Dec-22    MANDIRI       1220011559559   Duka Raya Kampial - Perumahan Raya Kampial                 3,868,694     4,029,890         -         161,196         3,868,694
                                                 SUKA DUKA GIRI HILL, Biaya Management Fee atas
                                                 Revenue Sharing periode Oktober 2022 di Suka Duka
86    23-Dec-22    MANDIRI       1220011559559   Raya Kampial - Perumahan Giri Hill                         2,215,239     2,307,540         -          92,301         2,215,239
                                                 PERHIMPUNAN PEMILIK DAN PENGHUNI SATUAN
                                                 RUMAH SUSUN HUNIAN DAN NON HUNIAN MAL &
                                                 KONDOMINIUM TAMAN ANGGREK, Biaya Sewa
                                                 Penempatan Perangkat Telekomunikasi di Mall &
                                                 Kondominium Taman Anggrek Berdasarkan Profit
87    23-Dec-22    MANDIRI       1220011559559   Sharing Periode November 2022                             14,305,109    15,894,566         -       1,589,457        14,305,109
                                                 AP FIELD OPERATION & OPTIMIZING, Kompensasi
                                                 Listrik Warga Project Jakwifi Batch 1 ( 634 Pole -
                                                 Penerima Kompensasi 635 Warga ) Tahap ke 10
88    23-Dec-22   SINARMAS        0000240408     Periode 2023                                             115,150,000   115,150,000         -             -         115,150,000
                                                 TRIMITRA PUTRA MANDIRI, PT, Reimbursement
                                                 Insentif Outsource Div. Direct Sales periode Okt NOV
89    27-Dec-22    MANDIRI       1220011559559   2022                                                     124,854,048   124,027,200   1,010,592       183,744       124,854,048
                                                 DANAMAS INSAN KREASI ANDALAN, PT,
                                                 Reimbursement Salary Outsource Div. Direct Sales
90    27-Dec-22    MANDIRI       1220011559559   Periode Nov 2022 dan Insentif Periode Okt 2022            54,447,263    54,086,685    440,706         80,128        54,447,263
                                                 ARYAVENTURA REALTY, PT, Sewa Penempatan
                                                 Perangkat di Gedung Ventura periode 01 Nov 2022 -
91    27-Dec-22    MANDIRI       1220011559559   31 Okt 2023                                               32,080,125    31,762,500   3,493,875     3,176,250        32,080,125
                                                 TRIMITRA PUTRA MANDIRI, PT, Reimbursement
                                                 Insentif Outsource Div. Direct Sales periode Okt NOV
92    27-Dec-22    MANDIRI       1220011559559   2022                                                      29,634,782    29,438,526    239,869         43,613        29,634,782
                                                 PPPRS KEBAGUSAN CITY, Sewa Penempatan
                                                 Perangkat di Apartement Kebagusan City periode 01
93    27-Dec-22    MANDIRI       1220011559559   Jan 2022 - 31 Des 2022                                    13,500,000    15,000,000         -       1,500,000        13,500,000
                                                 ASOSIASI PENYELENGGARA JASA INTERNET
                                                 INDONESIA, Biaya Fasilitas Anggota Atas
                                                 Penggunaan/Penempatan SCL periode 06 Des 2022 -
94    27-Dec-22    MANDIRI       1220011559559   05 Des 2023                                               13,080,000    12,000,000   1,320,000       240,000        13,080,000
                                                 ASOSIASI PENYELENGGARA JASA INTERNET
                                                 INDONESIA, Biaya Fasilitas Anggota Atas
                                                 Penggunaan/Penempatan SCL periode 06 Des 2022 -
95    27-Dec-22    MANDIRI       1220011559559   05 Des 2023                                               10,900,000    10,000,000   1,100,000       200,000        10,900,000
                                                 MOXCAL TEKNOLOGI, PT, Tagihan Sewa Modul
                                                 Aplikasi Call Center Centerix periode 17 Nov 2022 -
96    27-Dec-22    MANDIRI       1220011559559   16 Des 2022 (Additional 10qty)                            10,900,000    10,000,000   1,100,000       200,000        10,900,000
                                                 MOXCAL TEKNOLOGI, PT, Tagihan Sewa Modul
                                                 Aplikasi Call Center Centerix periode 17 Nov 2022 -
97    27-Dec-22    MANDIRI       1220011559559   16 Des 2022 (Additional 10qty)                            10,900,000    10,000,000   1,100,000       200,000        10,900,000
                                                 MOXCAL TEKNOLOGI, PT, Tagihan Sewa Modul
                                                 Aplikasi Call Center Centerix periode 17 Nov 2022 -
98    27-Dec-22    MANDIRI       1220011559559   16 Des 2022 (Additional 10qty)                             5,450,000     5,000,000    550,000        100,000         5,450,000
Page 42
      TANGGAL
    PENGELUARAN                 NOMOR REKENING
       DI BANK  REKENING BANK     BANK YANG                                                             NILAI MUTASI                NILAI YANG DIBAYARKAN
NO.  STATEMENT YANG DIGUNAKAN     DIGUNAKAN              NAMA VENDOR DAN KETERANGAN                        BANK         DPP         PPN             PPh       NET DIBAYARKAN

                                                 INTILAND DEVELOPMENT TBK, PT (SURABAYA), Sewa
                                                 Penempatan Perangkat Telekomunikasi Server MMR
99    27-Dec-22    MANDIRI       1220011559559   B1 di Gedung Intiland periode Des 2022                     4,040,000   4,000,000    440,000        400,000         4,040,000
                                                 WIJAYA KARYA REALTY, PT, Biaya atas Pemakaian
                                                 Listrik di Gedung Tamansari Parama Periode 01
100   27-Dec-22    MANDIRI       1220011559559   November 2022 - 30 November 2022                           1,206,697   1,231,323        -           24,626         1,206,697
                                                 SUMMARECON AGUNG, PT, Biaya atas Pemakaian
101   27-Dec-22    MANDIRI       1220011559559   Listrik di The Springlake View periode Nov 2022             909,305     900,485      97,013         88,193           909,305
                                                 PENGELOLA PUSAT BELANJA, PT, Biaya atas
                                                 Pemakaian Listrik di Mall Bassura periode 16 Okt
102   27-Dec-22    MANDIRI       1220011559559   2022 - 15 Nov 2022                                          857,664     849,172      93,409         84,917           857,664
                                                 SUGIH BERKAT, PT, Biaya atas Pemakaian Listrik di
                                                 Gedung Menara Citicon periode 27 Oktober 2022 -
103   27-Dec-22    MANDIRI       1220011559559   27 November 2022                                            707,000     700,000      77,000         70,000           707,000
                                                 INTILAND DEVELOPMENT TBK, PT (SURABAYA), Biaya
                                                 atas Pemakaian Listrik di Gedung Intiland Surabaya
104   27-Dec-22    MANDIRI       1220011559559   periode Nov 2022                                            656,682     729,646         -           72,964           656,682
                                                 PLAZA INDONESIA REALTY TBK, PT, Biaya atas
                                                 Pemakaian Listrik di Plaza Indonesia periode Nov
105   27-Dec-22    MANDIRI       1220011559559   2022                                                        641,718     635,364      69,890         63,536           641,718

                                                 TOWER OPERATION, Uang Muka Beban Umum atas
                                                 Biaya Pascabayar Paket Data Mikrotik Regional Jawa
106   27-Dec-22    MANDIRI       1220011559559   Timur Periode Desember 2022 - PR : 1010031647               582,750     582,750         -              -             582,750
                                                 MULIA CEMERLANG DIAN PERSADA, PT, Biaya atas
                                                 Pemakaian Listrik di Wisma GKBI periode November
107   27-Dec-22    MANDIRI       1220011559559   2022                                                        557,816     552,293      60,752         55,229           557,816
                                                 NICO CENTRAL, PT, Biaya atas Pemakaian Listrik di
108   27-Dec-22    MANDIRI       1220011559559   Gedung Sona Topas Tower Periode Nov 2022                    365,721     362,100      39,831         36,210           365,721
                                                 DONNELLY PARAMITA UTAMA, PT, Biaya atas
                                                 Pemakaian Listrik di Gedung Transavia Land/Graha
109   27-Dec-22    MANDIRI       1220011559559   Paramita periode November 2022                              305,498     302,473      33,272         30,247           305,498

                                                 TRI PURA INDAH PERSADA, PT, Biaya atas Pemakaian
110   27-Dec-22    MANDIRI       1220011559559   Listrik Gd. Wirausaha Kuningan Periode Nov 2022             295,343     292,418      32,166         29,241           295,343
                                                 MEKAR PRANA INDAH, PT, Biaya atas Pemakaian
111   27-Dec-22    MANDIRI       1220011559559   Listrik di Menara Bidakara 2 periode Nov 2022               272,253     269,557      29,651         26,955           272,253
                                                 MENARA THAMRIN, PT, Biaya atas Pemakaian Listrik
                                                 di Gedung Menara Thamrin Suite 21 & 6 periode
112   27-Dec-22    MANDIRI       1220011559559   November 2022                                               232,735     230,431      25,347         23,043           232,735
                                                 GRAHANIAGA TATAUTAMA, PT, Biaya atas
                                                 pemakaian Listrik di Gedung Graha Niaga Tatautama
113   27-Dec-22    MANDIRI       1220011559559   Periode 21/10/2022 - 20/11/2022                             232,658     230,354      25,339         23,035           232,658
                                                 PPPSRSS SAHID SUDIRMAN CENTER, Biaya atas
                                                 Pemakaian Listrik di Sahid Sudirman Centre Lt. 46
114   27-Dec-22    MANDIRI       1220011559559   periode 21 Okt 2022 - 20 Nov 2022                           231,020     228,733      25,160         22,873           231,020
                                                 PURIAMPERA INTIPRATAMA, PT, Biaya atas
                                                 Pemakaian Listrik di Gedung Ad Premier Periode Nov
115   27-Dec-22    MANDIRI       1220011559559   2022                                                        228,078     225,820      24,840         22,582           228,078
                                                 PPPSRSS SAHID SUDIRMAN CENTER, Biaya atas
                                                 Pemakaian Listrik di Sahid Sudirman Centre Lt. 46
116   27-Dec-22    MANDIRI       1220011559559   periode 21 Okt 2022 - 20 Nov 2022                           215,843     213,706      23,507         21,370           215,843
                                                 PPPSRSS SAHID SUDIRMAN CENTER, Biaya atas
                                                 Pemakaian Listrik di Sahid Sudirman Centre Lt. 46
117   27-Dec-22    MANDIRI       1220011559559   periode 21 Okt 2022 - 20 Nov 2022                           215,843     213,706      23,507         21,370           215,843
                                                 ARYAVENTURA REALTY, PT, Biaya atas Pemakaian
118   27-Dec-22    MANDIRI       1220011559559   Listrik di Gedung Aryaventura periode Nov 2022              206,161     204,120      22,453         20,412           206,161
                                                 RAJAWALI ADIWISMA, PT, Biaya atas Pemakaian
119   27-Dec-22    MANDIRI       1220011559559   Listrik di Menara Rajawali Periode Nov 2022                 187,751     185,892      20,448         18,589           187,751
                                                 PENGELOLA MASPION PLAZA GUNUNG SAHARI,
                                                 Biaya atas Pemakaian Listrik di Gedung Maspion
120   27-Dec-22    MANDIRI       1220011559559   Plaza Lt. 5A periode November 2022                          186,391     207,101         -           20,710           186,391
                                                 MUSTIKA RATU CENTRE, PT, Biaya atas Pemakaian
                                                 Listrik di Gedung Mustika Ratu Centre periode Nov
121   27-Dec-22    MANDIRI       1220011559559   2022                                                        173,176     171,461      18,861         17,146           173,176
                                                 BALI UTAMA CAKRAWALA, PT, Biaya atas Pemakaian
                                                 Listrik di Gedung Discovery Shopping Mall Periode 29
122   27-Dec-22    MANDIRI       1220011559559   Oct 2022 - 28 Nov 2022                                      164,716     163,086      17,938         16,308           164,716
                                                 ISMAWA TRIMITRA, PT, Biaya atas Pemakaian Listrik
                                                 di Graha Iskandarsyah periode 21 Okt 2022 - 20 Nov
123   27-Dec-22    MANDIRI       1220011559559   2022                                                        161,431     159,832      17,582         15,983           161,431
                                                 PENGELOLA LANDMARK PLUIT, PT, Biaya atas
                                                 Pemakaian Listrik Landmark Pluit (GF-E) periode 16
124   27-Dec-22    MANDIRI       1220011559559   Oktober 2022 - 15 November 2022                             151,599     150,097      16,511         15,009           151,599
                                                 PENGELOLA LANDMARK PLUIT, PT, Biaya atas
                                                 Pemakaian Listrik Landmark Pluit (GF-E) periode 16
125   27-Dec-22    MANDIRI       1220011559559   Oktober 2022 - 15 November 2022                             147,477     146,016      16,062         14,601           147,477
                                                 PERHIMPUNAN PEMILIK DAN PENGHUNI SATUAN
                                                 RUMAH RUSUN SPAZIO, Biaya atas Pemakaian Listrik
                                                 & Admin di Rusun Spazio periode 21 Oktober 2022 -
126   27-Dec-22    MANDIRI       1220011559559   20 November 2022                                            146,603     146,870         -             267            146,603
                                                 PENGELOLA LANDMARK PLUIT, PT, Biaya atas
                                                 Pemakaian Listrik Landmark Pluit (GF-E) periode 16
127   27-Dec-22    MANDIRI       1220011559559   Oktober 2022 - 15 November 2022                             133,434     132,113      14,532         13,211           133,434
                                                 PERHIMPUNAN PENGHUNI WISMA STACO, Biaya
                                                 atas Pemakaian Listrik di Wisma Staco periode Nov
128   27-Dec-22    MANDIRI       1220011559559   2022                                                        131,456     146,062         -           14,606           131,456
                                                 GRAHA IRAMA, PT, Biaya atas Pemakaian Listrik di
                                                 Gedung Graha Irama periode 01 Nov 2022 - 01 Des
129   27-Dec-22    MANDIRI       1220011559559   2022                                                        130,185     144,649         -           14,464           130,185
                                                 PENGELOLA LANDMARK PLUIT, PT, Biaya atas
                                                 Pemakaian Listrik Landmark Pluit (GF-E) periode 16
130   27-Dec-22    MANDIRI       1220011559559   Oktober 2022 - 15 November 2022                             121,375     120,173      13,219         12,017           121,375
Page 43
      TANGGAL
    PENGELUARAN                 NOMOR REKENING
       DI BANK  REKENING BANK     BANK YANG                                                             NILAI MUTASI                 NILAI YANG DIBAYARKAN
NO.  STATEMENT YANG DIGUNAKAN     DIGUNAKAN                NAMA VENDOR DAN KETERANGAN                      BANK         DPP          PPN             PPh       NET DIBAYARKAN
                                                 DWIBINA PRIMA, PT, Biaya atas Pemakaian Listrik di
131   27-Dec-22    MANDIRI       1220011559559   Wisma BSG periode Nov 2022                                    87,679      86,811       9,549          8,681            87,679
                                                 SAINATH REALINDO, PT, Biaya atas Pemakaian Listrik
132   27-Dec-22    MANDIRI       1220011559559   di Gedung Sainath Tower periode Nov 2022                      77,895      86,549          -           8,654            77,895
                                                 INTILAND DEVELOPMENT TBK, PT (SURABAYA), Biaya
                                                 atas Pemakaian Listrik di Gedung Intiland Surabaya
133   27-Dec-22    MANDIRI       1220011559559   periode Nov 2022                                              73,695      72,965       8,026          7,296            73,695
                                                 PLN PERSERO, PT, Biaya pembelian token pulsa
134   27-Dec-22   SINARMAS        00002999994    prabayar di 8 site pemakaian bulan Januari 2023           12,237,500   12,237,500         -             -          12,237,500
                                                 PLN PERSERO, PT, Biaya Penyambungan Baru Gardu
                                                 Bali Collection (KA277) untuk BTDC19 Melia Resort
135   27-Dec-22   SINARMAS        00002999994    dan BTDC14 Melia & Nusa Dua Beach).                       26,092,000   26,092,000         -             -          26,092,000
                                                 LINK NET TBK, PT, Link Net IDC Duren Tiga (3D) to
                                                 Omadata Intiland Surabaya Tower LT.3 B00573-014
136   27-Dec-22    MANDIRI       1220011559559   5Gbps periode Nov 2022                                    30,520,000   28,000,000   3,080,000       560,000        30,520,000
                                                 CYBER NETWORK INDONESIA, PT, Sewa Colocation
                                                 Rack IU OTB (MMR) periode Des 2022, Biaya Sewa
137   27-Dec-22    MANDIRI       1220011559559   Collocation OTB Nix Bali periode Des 2022                  3,270,000    3,000,000    330,000         60,000         3,270,000
                                                 CYBER NETWORK INDONESIA, PT, Sewa Colocation
                                                 Rack IU OTB (MMR) periode Des 2022, Biaya Sewa
138   27-Dec-22    MANDIRI       1220011559559   Collocation OTB Nix Bali periode Des 2022                  2,997,500    2,750,000    302,500         55,000         2,997,500
                                                 LINK NET TBK, PT, Link Net IDC Duren Tiga (3D) to
                                                 Omadata Intiland Surabaya Tower LT.3 B00573-014
139   27-Dec-22    MANDIRI       1220011559559   5Gbps periode Nov 2022                                     2,725,000    2,500,000    275,000         50,000         2,725,000
                                                 SCG BARITO LOGISTICS, PT, Biaya Pengiriman
                                                 Material Switch, JC 24 & 48 Core, Bracket, SFP dari
140   27-Dec-22    MANDIRI       1220011559559   WH Serpong ke WH Matraman                                   545,000      500,000      55,000         10,000           545,000
                                                 SCG BARITO LOGISTICS, PT, Biaya Pengiriman
                                                 Material Switch, JC 24 & 48 Core, Bracket, SFP dari
141   27-Dec-22    MANDIRI       1220011559559   WH Serpong ke WH Matraman                                   545,000      500,000      55,000         10,000           545,000
                                                 JASATAMA DIRGANTARA EKSPRESS LOGISTIK, PT,
                                                 Biaya Pengiriman Material CSR JW Batch 3 dari PT
142   27-Dec-22    MANDIRI       1220011559559   Furukawa ke PT Rosalindo Bhatara Sakti                      495,500      500,000       5,500         10,000           495,500
                                                 JASATAMA DIRGANTARA EKSPRESS LOGISTIK, PT,
                                                 Biaya Pengiriman Material CSR JW Batch 3 dari PT
143   27-Dec-22    MANDIRI       1220011559559   Furukawa ke PT Rosalindo Bhatara Sakti                      495,500      500,000       5,500         10,000           495,500
                                                 JASATAMA DIRGANTARA EKSPRESS LOGISTIK, PT,
                                                 Biaya Pengiriman Material CSR JW Batch 3 dari PT
144   27-Dec-22    MANDIRI       1220011559559   Furukawa ke PT Rosalindo Bhatara Sakti                      495,500      500,000       5,500         10,000           495,500
                                                 TIRTA INDORAYA LOGISTICS, PT, Biaya Pengiriman
                                                 Material Cable 32 Core dari PT Prysmian Cable ke PT
145   27-Dec-22    MANDIRI       1220011559559   Kaliabang Jaya Pratama                                     1,035,500     950,000     104,500         19,000         1,035,500
                                                 AREA JEMBRANA, Biaya retribusi menara
                                                 telekomunikasi untuk site yang beralokasi di
146   27-Dec-22   SINARMAS        00002999994    kabupaten Jembrana                                         9,741,600    9,741,600         -             -           9,741,600

                                                 BIBIT, Mr, Biaya Perbaikan FO Cut di Summarecon
                                                 Samasta Jimbaran dan Perbaikan Kabel Kendor dan
147   27-Dec-22   SINARMAS        00002999994    Pondasi Tiang yang hancur di Cluster Teras Hijau           2,165,244    2,232,210         -          66,966         2,165,244
                                                 IMAM TAUFIK, Biaya Pekerjaan Relokasi Kabel FO
148   27-Dec-22   SINARMAS        00002999994    Link M_07 Ocean CCTV Area Pantai Seminyak                  2,685,658    2,768,720         -          83,062         2,685,658
                                                 PPPSRS CIBUBUR VILLAGE APARTMENT, Sewa
                                                 Penempatan Perangkat di Apartement Cibubur
149   28-Dec-22    MANDIRI       1220011559559   Village periode 31 Agust 2022 - 30 Agust 2023             45,000,000   50,000,000         -       5,000,000        45,000,000
                                                 WISMA KEIAI INDONESIA, PT, Tagihan Profit Sharing
                                                 Penempatan Perangkat Telekomunikasi di Gedung
150   28-Dec-22    MANDIRI       1220011559559   Wisma Keiai periode Juli - September 2022                 30,680,542   30,376,774   3,341,445     3,037,677        30,680,542
                                                 PRATAMA INTI SORSING, PT, Reimbursement Salary
                                                 Outsource Div. Direct Sales Area Bali Periode Okt
151   28-Dec-22    MANDIRI       1220011559559   2022                                                      15,839,985   15,735,084    128,212         23,311        15,839,985
                                                 QUIROS NETWORKS, PT, Biaya Pemakaian Telepon
152   28-Dec-22    MANDIRI       1220011559559   Call Center Bulan Nov 2022                                12,738,212   11,475,867   1,262,345           -          12,738,212
                                                 PPPSRS APARTEMENT PERMATA SURYA 1, Tagihan
                                                 Revenue Sharing Bali Fiber di Apartement Permata
153   28-Dec-22    MANDIRI       1220011559559   Surya I periode Juli - September 2022                      6,657,072    7,396,747         -         739,675         6,657,072
                                                 DUTA TELEKOMINDO NUSANTARA, PT, Tagihan
                                                 Revenue Sharing Penempatan Jaringan dan Layanan
                                                 Bali Fiber di Apartement Citylofts Sudirman periode
154   28-Dec-22    MANDIRI       1220011559559   Juli - September 2022                                      4,081,799    4,041,386    444,552        404,139         4,081,799

                                                 SUKA DUKA RAYA KAMPIAL, Biaya Management Fee
                                                 atas Revenue Sharing periode September 2022 di
155   28-Dec-22    MANDIRI       1220011559559   Suka Duka Raya Kampial - Perumahan Raya Kampial            3,814,149    3,973,072         -         158,923         3,814,149
                                                 DUTA TELEKOMINDO NUSANTARA, PT, Tagihan
                                                 Revenue Sharing Penempatan Jaringan dan Layanan
                                                 Bali Fiber di Apartement Citylofts Sudirman periode
156   28-Dec-22    MANDIRI       1220011559559   Juli - September 2022                                      2,109,954    2,089,063    229,797        208,906         2,109,954
                                                 BENDARA SARANA ABADI, PT, Tagihan Revenue
                                                 Sharing Bali Fiber di Apartement City Light periode
157   28-Dec-22    MANDIRI       1220011559559   Juli - September 2022                                      1,961,960    2,002,000         -          40,040         1,961,960

                                                 SERPONG MAS TELEMATIKA, PT, Biaya Management
                                                 Fee atas Revenue Sharing Residential periode
158   28-Dec-22    MANDIRI       1220011559559   September 2022 di Kawasan Bumi Serpong Damai               1,379,243    1,265,360    139,190         25,307         1,379,243
                                                 MENARA PRAMBANAN, PT, Tagihan Sharing Revenue
                                                 Bali Fiber di Apartement Poins Square periode Juli -
159   28-Dec-22    MANDIRI       1220011559559   September 2022                                             1,204,360    1,192,436    131,168        119,244         1,204,360

                                                 PPPSRS 1 PARK RESIDENCES, Tagihan Sharing
                                                 Revenue Bali Fiber di Apartement 1Park Residences
160   28-Dec-22    MANDIRI       1220011559559   periode Februari 2020 - September 2022                     1,176,177    1,200,181         -          24,004         1,176,177
                                                 INTI ALGORITMA PERDANA, PT, Tagihan
                                                 Management Fee atas Revenue Sharing periode
                                                 Januari 2022 - September 2022 di Apartement
161   28-Dec-22    MANDIRI       1220011559559   Regatta 2                                                  1,174,748    1,077,750    118,553         21,555         1,174,748
Page 44
      TANGGAL
    PENGELUARAN                 NOMOR REKENING
       DI BANK  REKENING BANK     BANK YANG                                                              NILAI MUTASI                   NILAI YANG DIBAYARKAN
NO.  STATEMENT YANG DIGUNAKAN     DIGUNAKAN                NAMA VENDOR DAN KETERANGAN                       BANK          DPP           PPN             PPh       NET DIBAYARKAN
                                                 INTI ALGORITMA PERDANA, PT, Tagihan
                                                 Management Fee atas Revenue Sharing periode
                                                 Januari 2022 - September 2022 di Apartement
162   28-Dec-22    MANDIRI       1220011559559   Regatta 2                                                    337,634       309,756       34,073          6,195           337,634
                                                 PPPSRS CBD PLUIT, Biaya atas Pemakaian Listrik CBD
163   28-Dec-22    MANDIRI       1220011559559   Pluit periode November 2022                                  332,111       332,111           -             -             332,111
                                                 BUMI MULIA PERKASA DEVELOPMENT, PT, Biaya atas
                                                 Pemakaian Listrik di Gedung Atrium Mulia periode
164   28-Dec-22    MANDIRI       1220011559559   November 2022                                                232,423       230,122       25,313         23,012           232,423
                                                 MENARA PRAMBANAN, PT, Biaya atas Pemakaian
                                                 Listrik di Apartement Poins Square periode
165   28-Dec-22    MANDIRI       1220011559559   November 2022                                                232,319       258,132           -          25,813           232,319
                                                 BANGUNMUSTIKA INTIPERSADA, PT, Tagihan Sewa &
                                                 Service Charge Kantor Call Center & Acces Point Lt. 4
166   28-Dec-22    MANDIRI       1220011559559   Cipulir periode Jan - Mar 2023                            202,925,160   200,916,000   22,100,760    20,091,600       202,925,160
                                                 SMARTFREN TELECOM TBK, PT, Internet Bandwith 15
167   28-Dec-22    MANDIRI       1220011559559   site @50 Mbps (I: 8000001057)                             449,550,000   405,000,000   44,550,000           -         449,550,000
                                                 INFRA SOLUSINDO, PT, Biaya Management Fee atas
                                                 Revenue Sharing periode Oktober 2022 di
168   28-Dec-22    MANDIRI       1220011559559   Apartement Green Pramuka                                   31,591,307    28,982,850    3,188,114       579,657        31,591,307
                                                 MEGA TELEKOMUNIKASI INDONESIA, PT, Biaya
                                                 Penempatan Sewa Perangkat Telekomunikasi
                                                 berdasarkan Revenue Sharing periode Juli -
169   28-Dec-22    MANDIRI       1220011559559   September 2022 di Gedung Metropolitan Tower                18,821,187    18,634,839    2,049,832     1,863,484        18,821,187
                                                 MULIA INTIPELANGI, PT, Biaya Sewa Penempatan
                                                 Perangkat Telekomunikasi di Mall Taman Anggrek
                                                 Berdasarkan Profit Sharing periode Juli - September
170   28-Dec-22    MANDIRI       1220011559559   2022                                                       13,756,914    13,620,707    1,498,278     1,362,071        13,756,914
171   28-Dec-22     BCA           3193058058     POWER TELECOM, PT, Sewa dark fiber                         10,192,776     9,351,170    1,028,629       187,023        10,192,776
172   28-Dec-22     BCA           3193058058     POWER TELECOM, PT, Sewa dark fiber                          9,679,200     8,880,000      976,800       177,600         9,679,200
173   28-Dec-22     BCA           3193058058     POWER TELECOM, PT, Sewa dark fiber                          6,356,880     5,832,000      641,520       116,640         6,356,880
174   28-Dec-22     BCA           3193058058     POWER TELECOM, PT, Sewa dark fiber                          4,692,450     4,305,000      473,550        86,100         4,692,450
175   28-Dec-22     BCA           3193058058     POWER TELECOM, PT, Sewa dark fiber                          3,683,642     3,379,487      371,744        67,589         3,683,642
176   28-Dec-22     BCA           3193058058     POWER TELECOM, PT, Sewa dark fiber                          3,025,295     2,775,500      305,305        55,510         3,025,295
                                                 PERHIMPUNAN PEMILIK & PENGHUNI SATUAN
                                                 RUMAH SUSUN APARTEMEN 1@CIKDITIRO, Biaya
                                                 Sewa Penempatan Perangkat Telekomunikasi di
                                                 Apartemen Cikditiro berdasarkan Profit Sharing
177   28-Dec-22    MANDIRI       1220011559559   Periode Januari - September 2021                            2,231,709     2,479,677         -          247,968         2,231,709
178   28-Dec-22     BCA           3193058058     POWER TELECOM, PT, Sewa dark fiber                          1,732,010     1,589,000     174,790         31,780         1,732,010
                                                 SERPONG MAS TELEMATIKA, PT, Biaya Sewa Core FO
                                                 2 core HH Pos Polisi - German Center periode Okt
179   28-Dec-22      BCA          3193058058     2022                                                        1,635,000     1,500,000     165,000         30,000         1,635,000

                                                 SERPONG MAS TELEMATIKA, PT, Biaya Management
                                                 Fee atas Revenue Sharing Residential periode
180   28-Dec-22    MANDIRI       1220011559559   September 2022 di Kawasan Bumi Serpong Damai                1,487,153     1,364,360      150,080        27,287         1,487,153
181   28-Dec-22     BCA           3193058058     POWER TELECOM, PT, Sewa dark fiber                          1,009,569       926,210      101,883        18,524         1,009,569
182   28-Dec-22     BCA           3193058058     POWER TELECOM, PT, Sewa dark fiber                         20,339,400    18,660,000    2,052,600       373,200        20,339,400
                                                 PEMERINTAH KOTA PEKALONGAN, Biaya Retribusi
                                                 Pengendalian Menara Telekomunikasi site Panjang
                                                 Wetan-003 Wilayah Kota Pekalongan periode 2020,
183   28-Dec-22    MANDIRI       1220011559559   2021 dan 2022                                               7,687,500     7,687,500          -             -           7,687,500
                                                 KEMENTERIAN SEKRETARIS NEGARA RI PUSAT
                                                 PENGELOLAAN KOMPLEK GELORA BUNG KARNO,
                                                 Tagihan Sharing Revenue Bali Fiber di Komplek
                                                 Gelora Bung Karno periode November 2021 - Juli
184   29-Dec-22    MANDIRI       1220011559559   2022                                                       98,475,000    97,500,000   10,725,000     9,750,000        98,475,000
                                                 DATAMEDIA MAKMUR PRATAMA, PT, Biaya Layanan
                                                 Content TV 42 Channel untuk Tenant RS Atma Jaya
185   29-Dec-22    MANDIRI       1220011559559   Pluit periode Des 2022                                     12,935,000    13,000,000          -          65,000        12,935,000
                                                 MOXCAL TEKNOLOGI, PT, Tagihan Sewa Modul
186   29-Dec-22    MANDIRI       1220011559559   Aplikasi Call Center Centerix periode Des 2022             10,900,000    10,000,000    1,100,000       200,000        10,900,000
                                                 LINK NET TBK, PT, Sewa Crossconnect 35 Mbps dari
                                                 Omadata Wisma Dharmala Intiland Local Loop (PO
187   29-Dec-22    MANDIRI       1220011559559   Tenant Intiland) periode Nov 2022                           9,810,000     9,000,000     990,000        180,000         9,810,000
                                                 CHINA MOBILE INTERNATIONAL LTD, IP Transit
                                                 Equinix SG 50Mbps Periode Nov 2022 & IP Transit
188   30-Dec-22   SINARMAS        0000240408     Equinix SG 20Mbps Periode Nov 2022                         10,167,288    10,167,288          -             -          10,167,288
                                                 CHINA MOBILE INTERNATIONAL LTD, IP Transit
                                                 Equinix SG 50Mbps Periode Nov 2022 & IP Transit
189   30-Dec-22   SINARMAS        0000240408     Equinix SG 20Mbps Periode Nov 2022                          7,329,180     7,329,180          -             -           7,329,180
                                                 AMAZANA KENCANA, PT, Biaya atas Pemakaian
190   03-Jan-23    MANDIRI       1220011559559   Listrik Apartemen Amazana Periode Nov 2022                   386,116       354,235       38,965          7,084           386,116
                                                 ASSET PACIFIC, PT, Biaya atas Pemakaian Listrik di
191   03-Jan-23    MANDIRI       1220011559559   Gedung Menara Salemba periode Nov 2022                       121,338       120,136       13,215         12,013           121,338
                                                 CHALISTA JAYA UTAMA, PT, Pembelian House Clamp
                                                 4 Inch 400 Pcs, Cable Network UTP Cat 5E 610 Mtr,
                                                 Cable Ties Stainless Panduit 681mm x 7.9mm
192   03-Jan-23    MANDIRI       1220011559559   Sebanyak 2 Pcs                                              3,420,000     3,420,000          -             -           3,420,000
                                                 CITRA KIRANA HIJAU RETAIL, PT, Biaya atas
                                                 Pemakaian Listrik di Gedung Green Sedayu Mall
193   03-Jan-23    MANDIRI       1220011559559   General 2 Lt.GF periode Nov 2022                             236,947       217,382       23,912          4,347           236,947
                                                 CITRA KIRANA HIJAU RETAIL, PT, Biaya atas
                                                 Pemakaian Listrik di Gedung Green Sedayu Mall
194   03-Jan-23    MANDIRI       1220011559559   General 2 Lt.GF periode Nov 2022                             374,914       343,958       37,835          6,879           374,914
                                                 CITRA KIRANA HIJAU RETAIL, PT, Biaya atas
                                                 Pemakaian Listrik di Gedung Green Sedayu Mall
195   03-Jan-23    MANDIRI       1220011559559   General 2 Lt.GF periode Nov 2022                             408,953       375,186       41,270          7,503           408,953
                                                 CITRA KIRANA HIJAU RETAIL, PT, Biaya atas
                                                 Pemakaian Listrik di Gedung Green Sedayu Mall
196   03-Jan-23    MANDIRI       1220011559559   General 2 Lt.GF periode Nov 2022                               98,580       90,440        9,948          1,808            98,580
                                                 DUNIA MAKMUR PROPERTI, PT, Biaya atas
                                                 Pemakaian Listrik di Plaza Summarecon Bekasi
197   03-Jan-23    MANDIRI       1220011559559   Periode Nov 2022                                             767,179       759,583       83,554         75,958           767,179
Page 45
      TANGGAL
    PENGELUARAN                 NOMOR REKENING
       DI BANK  REKENING BANK     BANK YANG                                                             NILAI MUTASI                 NILAI YANG DIBAYARKAN
NO.  STATEMENT YANG DIGUNAKAN     DIGUNAKAN               NAMA VENDOR DAN KETERANGAN                       BANK         DPP          PPN             PPh       NET DIBAYARKAN
                                                 GRAHA MEGAH SEJAHTERA, PT, Biaya Management
                                                 Fee atas Revenue Sharing periode Juli - September
198   03-Jan-23    MANDIRI       1220011559559   2022 di Gedung Plaza Timor 2                               2,229,050    2,045,000    224,950         40,900         2,229,050

                                                 JAKARTA INTILAND, PT, Biaya atas Pemakaian Listrik
199   03-Jan-23    MANDIRI       1220011559559   di Ramayana Karawang Periode Desember 2022                  484,594      479,797      52,776         47,979           484,594

                                                 JAKARTA INTILAND, PT, Biaya atas Pemakaian Listrik
200   03-Jan-23    MANDIRI       1220011559559   di Ramayana Karawang Periode Desember 2022                  286,919      284,078      31,248         28,407           286,919
                                                 LESTARI MAHADIBYA, PT, Biaya Pemakaian Listrik di
                                                 Summarecon Digital Centre (SDC) Serpong periode
201   03-Jan-23    MANDIRI       1220011559559   11 Okt 2022 - 10 Nov 2022                                   295,475      292,549      32,180         29,254           295,475
                                                 LESTARI MAHADIBYA, PT, Biaya Pemakaian Listrik di
                                                 Summarecon Digital Centre (SDC) Serpong periode
202   03-Jan-23    MANDIRI       1220011559559   11 Okt 2022 - 10 Nov 2022                                     85,262      84,417       9,286          8,441            85,262

                                                 LIZA CHRISTINA GARMENT INDUSTRY, PT, Biaya atas
203   03-Jan-23    MANDIRI       1220011559559   Pemakaian Listrik di Unity Building periode Nov 2022        505,000      500,000      55,000         50,000           505,000
                                                 MEGA PLAZA, PT, Biaya atas Pemakaian Listrik di
204   03-Jan-23    MANDIRI       1220011559559   Gedung Mega Plaza periode Nov 2022                          154,802      153,270      16,859         15,327           154,802
                                                 MEGA TELEKOMUNIKASI INDONESIA, PT, Sewa
                                                 Penempatan Perangkat di Gedung Metropolitan
205   03-Jan-23    MANDIRI       1220011559559   Tower periode 15 Nov 2022 - 14 Nov 2023                   21,210,000   21,000,000   2,310,000     2,100,000        21,210,000
                                                 MENARA DUTA, PT, Biaya atas Pemakaian Listrik
206   03-Jan-23    MANDIRI       1220011559559   Menara Duta Periode Nov 2022                                128,406      127,134      13,985         12,713           128,406
                                                 MONETI INDO TEKNO, PT, Pembelian Cable Ties 10
                                                 cm Black HZ 103.100 Pcs, Cables Ties 10 cm White HZ
207   03-Jan-23    MANDIRI       1220011559559   72.400 Pcs                                                 1,431,900    1,290,000    141,900            -           1,431,900
                                                 MONETI INDO TEKNO, PT, Pembelian Cable Ties 10
                                                 cm Black HZ 103.100 Pcs, Cables Ties 10 cm White HZ
208   03-Jan-23    MANDIRI       1220011559559   72.400 Pcs                                                  199,800      180,000      19,800            -             199,800
                                                 MONETI INDO TEKNO, PT, Pembelian Cable Ties 10
                                                 cm Black HZ 103.100 Pcs, Cables Ties 10 cm White HZ
209   03-Jan-23    MANDIRI       1220011559559   72.400 Pcs                                                26,671,635   24,028,500   2,643,135           -          26,671,635
                                                 OMADATA PADMA INDONESIA, PT, Biaya Sewa
                                                 Management Cable MMR 1U Open Rack Periode Des
                                                 2022, Biaya Sewa Management Cable - MMR 1U OTB
210   03-Jan-23    MANDIRI       1220011559559   Periode Des 2022 (Omadata)                                 2,180,000    2,000,000    220,000         40,000         2,180,000
                                                 OMADATA PADMA INDONESIA, PT, Biaya Sewa
                                                 Management Cable MMR 1U Open Rack Periode Des
                                                 2022, Biaya Sewa Management Cable - MMR 1U OTB
211   03-Jan-23    MANDIRI       1220011559559   Periode Des 2022 (Omadata)                                 1,635,000    1,500,000    165,000         30,000         1,635,000
                                                 PERHIMPUNAN PENGHUNI MENARA KADIN
                                                 INDONESIA, Biaya atas Pemakaian Listrik di Gedung
212   03-Jan-23    MANDIRI       1220011559559   Menara Kadin periode Nov 2022                               350,541      389,489          -          38,948           350,541
                                                 PETARUNG TANGGUH PERSADA, PT, Biaya atas
                                                 Pemakaian Listrik di Mal Bali Galeria periode Nov
213   03-Jan-23    MANDIRI       1220011559559   2022                                                        528,021      522,793      57,507         52,279           528,021
                                                 PUALAM KENCANA GEMILANG JAKARTA, PT, Biaya
                                                 atas Pemakaian Listrik di Gedung Perwata Tower
214   03-Jan-23    MANDIRI       1220011559559   periode 27 Sept 2022 - 26 Okt 2022                          610,975      604,926      66,541         60,492           610,975
                                                 PUALAM KENCANA GEMILANG JAKARTA, PT, Biaya
                                                 atas Pemakaian Listrik di Gedung Perwata Tower
215   03-Jan-23    MANDIRI       1220011559559   periode 27 Sept 2022 - 26 Okt 2022                          609,557      603,522      66,387         60,352           609,557
                                                 TECHNOLOGY DATA INDONESIA, PT, Tagihan
                                                 Reimbursement Listrik Rack No. Summer 243
216   03-Jan-23    MANDIRI       1220011559559   Periode Okt 2022                                            763,000      700,000      77,000         14,000           763,000
                                                 VIFA INDO SUKSES, PT, Pembelian Wire Rope 5 MM
                                                 1.000 Mtr, Wire Rope 3MM 1.000 Mtr untuk
217   03-Jan-23    MANDIRI       1220011559559   Kebutuhan Stock Tower Operation                            7,873,230    7,093,000    780,230            -           7,873,230
                                                 VIFA INDO SUKSES, PT, Pembelian Wire Rope 5 MM
                                                 1.000 Mtr, Wire Rope 3MM 1.000 Mtr untuk
218   03-Jan-23    MANDIRI       1220011559559   Kebutuhan Stock Tower Operation                            2,153,411    1,940,010    213,401            -           2,153,411
                                                 WAHANARIA CEMERLANG, PT, Biaya Listrik di Hotel
                                                 Ibis Styles Yogyakarta Lantai 6 site Sosromenduran
219   03-Jan-23    MANDIRI       1220011559559   002 periode November 2022                                  2,696,026    2,995,584         -         299,558         2,696,026

                                                 WISMA KEIAI INDONESIA, PT, Biaya Tagihan Listrik di
                                                 Wisma Keiai Lt. 22 periode Nov 2022, Biaya Tagihan
220   03-Jan-23    MANDIRI       1220011559559   Listrik di Wisma Keiai Lt. 21 periode Nov 2022             1,597,746    1,581,927    174,011        158,192         1,597,746

                                                 WISMA KEIAI INDONESIA, PT, Biaya Tagihan Listrik di
                                                 Wisma Keiai Lt. 22 periode Nov 2022, Biaya Tagihan
221   03-Jan-23    MANDIRI       1220011559559   Listrik di Wisma Keiai Lt. 21 periode Nov 2022              286,854      284,014      31,241         28,401           286,854
                                                 ALITA PRAYA MITRA, PT, Sewa Link FO Per 2 Core
                                                 HUT Malang POI XL periode 01/04/2022 -
222   03-Jan-23    MANDIRI       1220011559559   30/06/2022                                                 1,568,782    1,439,250    158,317         28,785         1,568,782
                                                 ALITA PRAYA MITRA, PT, Sewa Link FO Per 2 Core
                                                 HUT Malang POI XL periode 01/07/2022 -
223   03-Jan-23    MANDIRI       1220011559559   30/09/2022                                                 1,568,782    1,439,250    158,317         28,785         1,568,782
                                                 ALITA PRAYA MITRA, PT, Sewa Link FO Per 2 Core
224   03-Jan-23    MANDIRI       1220011559559   Mojolangu-004 periode 01/07/2022 - 30/09/2022             11,152,335   10,231,500   1,125,465       204,630        11,152,335
                                                 ALITA PRAYA MITRA, PT, Sewa Link FO Per 2 Core
225   03-Jan-23    MANDIRI       1220011559559   Mojolangu-004 periode 01/04/2022 - 30/06/2022             11,152,335   10,231,500   1,125,465       204,630        11,152,335

                                                 DIRGA BAHARI PERKASA, PT, Jasa Trainning Hikvision
226   03-Jan-23    MANDIRI       1220011559559   Certified Security Associate sebanyak 25 Peserta          55,481,982   50,900,901   5,599,099     1,018,018        55,481,982
                                                 INDONESIA COMNETS PLUS, PT, Sewa Local Loop 5
227   03-Jan-23    MANDIRI       1220011559559   Mbps Diskominfo Kab. Purwakarta Warudoyong                12,550,330   11,514,064   1,266,547       230,281        12,550,330
                                                 INTERNETINDO DATA CENTRA INDONESIA, PT,
                                                 Tagihan Kelebihan Pemakaian Listrik Rack No Winter
228   03-Jan-23    MANDIRI       1220011559559   233 Per 1 - 30 Nov 2022 (IDC Indonesia)                   11,445,000   10,500,000   1,155,000       210,000        11,445,000
                                                 INTERNETINDO DATA CENTRA INDONESIA, PT, Biaya
                                                 Sewa Penambahan Redundant Power Source Rack
229   03-Jan-23    MANDIRI       1220011559559   Winter 233 periode Des 2022                                2,180,000    2,000,000    220,000         40,000         2,180,000
Page 46
      TANGGAL
    PENGELUARAN                 NOMOR REKENING
       DI BANK  REKENING BANK     BANK YANG                                                              NILAI MUTASI                 NILAI YANG DIBAYARKAN
NO.  STATEMENT YANG DIGUNAKAN     DIGUNAKAN               NAMA VENDOR DAN KETERANGAN                        BANK         DPP          PPN             PPh       NET DIBAYARKAN
                                                 PERHIMNI WESTMARK, Sewa Penempatan Perangkat
                                                 di Apartement Perhimni Westmark periode 10 Jul
230   03-Jan-23    MANDIRI       1220011559559   2022 - 09 Jul 2023                                         22,500,000   25,000,000         -       2,500,000        22,500,000
                                                 PERHIMPUNAN PEMILIK DAN PENGHUNI SATUAN
                                                 RUMAH SUSUN KOMERSIAL CAMPURAN
                                                 SEMENTARA APARTEMENT SATU8 RESIDENCE,
                                                 Tagihan Revenue Sharing Bali Fiber di Apartement
231   03-Jan-23    MANDIRI       1220011559559   Satu8 Periode Oktober - Desember 2021                       2,990,694    3,051,728         -          61,034         2,990,694
                                                 PPPSRS APARTEMEN REGATTA VA, Sewa
                                                 Penempatan Perangkat di Apartement Regatta
232   03-Jan-23    MANDIRI       1220011559559   periode 01 Des 2022 - 30 Nov 2023                           1,782,000    1,980,000         -         198,000         1,782,000
                                                 TIRTA INDORAYA LOGISTICS, PT, Biaya Pengiriman
                                                 Material Cable Optical Drop SM 1 Core dari PT
233   03-Jan-23    MANDIRI       1220011559559   Furukawa ke WH Serpong                                      1,308,000    1,200,000    132,000         24,000         1,308,000
                                                 TIRTA INDORAYA LOGISTICS, PT, Biaya Pengiriman
                                                 Material Cable Optical Drop SM 1 Core dari PT
234   03-Jan-23    MANDIRI       1220011559559   Furukawa ke WH Serpong                                      2,398,000    2,200,000    242,000         44,000         2,398,000
                                                 TRANS INDONESIA SUPERKORIDOR, PT, Biaya Sewa
                                                 Intercity Jakarta - Diskominfo Cirebon 500Mbps
235   03-Jan-23    MANDIRI       1220011559559   periode 01 - 30 Nov 2022                                    8,933,313    8,195,700    901,527        163,914         8,933,313
                                                 TRANS INDONESIA SUPERKORIDOR, PT, Biaya Sewa
                                                 Intercity Jakarta - Diskominfo Cirebon 500Mbps
236   03-Jan-23    MANDIRI       1220011559559   periode 01 - 30 Nov 2022                                    8,912,004    8,176,150    899,377        163,523         8,912,004
                                                 TRI PURA INDAH PERSADA, PT, Sewa Penempatan
                                                 Perangkat di Gedung Wirausaha periode 01 Des 2022
237   03-Jan-23    MANDIRI       1220011559559   - 30 Nov 2023                                              25,250,000   25,000,000   2,750,000     2,500,000        25,250,000
                                                 WAHANA KARYA HUTAMA, PT, Sewa Penempatan
                                                 Perangkat di Gedung Pengelola Komp. Simprug
238   03-Jan-23    MANDIRI       1220011559559   Gallery                                                     6,060,000    6,000,000    660,000        600,000         6,060,000
                                                 XL AXIATA TBK, PT, Biaya Tagihan Pasca Bayar
                                                 Pembelian Pulsa XL Mikrotik (Monitoring NOC)
                                                 Periode Desember 2022 (Pemakaian November 2022-
239   03-Jan-23    MANDIRI       1220011559559   Jabodetabek Area (10 Site)                                  1,010,100     910,000     100,100            -           1,010,100
                                                 DAIDAN UTAMA PIALANG ASURANSI, PT, Biaya
                                                 Premi Asuransi PAR & EQ Add 8 site MCP Non Bank
240   03-Jan-23    MANDIRI       1220011559559   periode 31 Des 2021 - 31 Des 2022                           1,228,562    1,228,562         -             -           1,228,562
                                                 MEDIA NUSANTARA DATA GLOBAL, PT, Sewa
                                                 Crossconnect Fiber Optic in Data Center CDCI - 1 Port
241   03-Jan-23    MANDIRI       1220011559559   REQ/21FEB19/00000008 periode Nov 2022                       1,635,000    1,500,000    165,000         30,000         1,635,000
                                                 MEDIA NUSANTARA DATA GLOBAL, PT, Sewa Full
                                                 Rack Server Cabinet 45U periode Nov 2022, Biaya
                                                 Sewa Penempatan OTB fiber in NER periode Nov
242   03-Jan-23    MANDIRI       1220011559559   2022                                                        2,180,000    2,000,000    220,000         40,000         2,180,000
                                                 MEDIA NUSANTARA DATA GLOBAL, PT, Sewa Full
                                                 Rack Server Cabinet 45U periode Nov 2022, Biaya
                                                 Sewa Penempatan OTB fiber in NER periode Nov
243   03-Jan-23    MANDIRI       1220011559559   2022                                                       10,900,000   10,000,000   1,100,000       200,000        10,900,000
                                                 SERPONG MAS TELEMATIKA, PT, Sewa Local Loop
                                                 Dedicated dan Broadband West BSD untuk 44 Tenant
244   03-Jan-23    MANDIRI       1220011559559   periode Okt 2022                                           62,727,320   57,548,000   6,330,280     1,150,960        62,727,320
                                                 FABCO GLOBAL INDONESIA, PT, Pembelian
                                                 Pengadaan Kaos Orange untuk Support Sales
                                                 Residential Periode November 2022 ukuran S
245   03-Jan-23    MANDIRI       1220011559559   Sebanyak 4 Pcs, ukuran M Sebanyak 5 Pcs                     2,205,000    2,250,000         -          45,000         2,205,000

                                                 BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
                                                 Penarikan Kabel FO Cut Impact Tertabrak Truck dan
246   03-Jan-23    MANDIRI       1220011559559   Ditimpa Tiang site Jatirasa-005,                            1,931,034    1,980,547         -          49,513         1,931,034

                                                 BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
                                                 Penarikan Kabel FO Cut Impact Tertabrak Truck site
247   03-Jan-23    MANDIRI       1220011559559   Diskominfo AP RW01, Pegangsaan, Menteng, Jakpus             1,925,574    1,974,947         -          49,373         1,925,574
                                                 BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
                                                 Penarikan Kabel FO Cut Impact Kabel Tertabrak Truck
248   03-Jan-23    MANDIRI       1220011559559   site MP Cipete Utara-001                                    1,987,194    2,038,147         -          50,953         1,987,194
                                                 BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
                                                 Penarikan Kabel FO Cut Impact Pembangunan Jalan
249   03-Jan-23    MANDIRI       1220011559559   Toll site MP Cipedak-001                                    2,380,314    2,441,347         -          61,033         2,380,314
                                                 BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
                                                 Penarikan Kabel FO Cut Impact Tertabrak Truck site
250   03-Jan-23    MANDIRI       1220011559559   Duri Kepa-017                                               2,280,474    2,338,947         -          58,473         2,280,474
                                                 BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
                                                 Penarikan Kabel FO Cut Impact Tertabrak Truck site
                                                 Diskominfo AP RW01, Tanjung Duren Selatan, Grogol
251   03-Jan-23    MANDIRI       1220011559559   Petamburan, Jakbar                                          1,700,934    1,744,547         -          43,613         1,700,934

                                                 BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
                                                 Penarikan Kabel FO Cut Impact Tertabrak Truck site
252   03-Jan-23    MANDIRI       1220011559559   Diskominfo AP RW13, kalideres, Jakbar                       1,959,114    2,009,347         -          50,233         1,959,114
                                                 BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
                                                 Penarikan Kabel FO Cut Impact Tertabrak kendaraan
253   03-Jan-23    MANDIRI       1220011559559   site MP Ragunan-001                                         1,491,894    1,530,147         -          38,253         1,491,894

                                                 BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
                                                 Penarikan Kabel FO Cut Impact Tertabrak Truck site
254   03-Jan-23    MANDIRI       1220011559559   Rumah Pompa Baru Jl. H RW08                                 1,526,994    1,566,147         -          39,153         1,526,994
                                                 BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
                                                 Penarikan Kabel FO Cut Impact Tertabrak Kendaraan
255   03-Jan-23    MANDIRI       1220011559559   site Klender-008                                            1,888,914    1,937,347         -          48,433         1,888,914
                                                 BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
                                                 Penarikan Kabel FO Cut Impact Tertimpa Pohon
256   03-Jan-23    MANDIRI       1220011559559   Tumbang site Bintaro-010                                    2,183,754    2,239,747         -          55,993         2,183,754
Page 47
      TANGGAL
    PENGELUARAN                 NOMOR REKENING
       DI BANK  REKENING BANK     BANK YANG                                                              NILAI MUTASI                   NILAI YANG DIBAYARKAN
NO.  STATEMENT YANG DIGUNAKAN     DIGUNAKAN              NAMA VENDOR DAN KETERANGAN                         BANK          DPP           PPN             PPh       NET DIBAYARKAN

                                                 BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
                                                 Penarikan Kabel FO Cut Impact Kabel Tertabrak Truck
257   03-Jan-23    MANDIRI       1220011559559   Pengangkut Barang site MP Cipedak-001                       1,442,754     1,479,747          -          36,993         1,442,754
                                                 BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
                                                 Penarikan Kabel FO Cut Impact Kabel Tertabrak Truck
258   03-Jan-23    MANDIRI       1220011559559   site MP Pondok Pinang-001                                   1,818,714     1,865,347          -          46,633         1,818,714
                                                 BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
                                                 Penarikan Kabel FO Cut Impact Kabel digigit Hewan
259   03-Jan-23    MANDIRI       1220011559559   site Grogol Utara-003                                       2,083,914     2,137,347          -          53,433         2,083,914
                                                 PENGEMBANGAN PARIWISATA INDONESIA, PT,
                                                 Tagihan Kompensasi Persentase Revenue Sharing
                                                 Triwulan III/2021 Periode 01 Juli - 30 September
260   04-Jan-23    MANDIRI       1220011559559   2021                                                       70,252,147    69,556,581    7,651,224     6,955,658        70,252,147
                                                 INDOSAT TBK, PT, Biaya Sewa Domestic Ethernet Link
                                                 (MPLS) MSC Gatsu Denpasar Bali to KPPTI Lt. 6
261   04-Jan-23    MANDIRI       1220011559559   Jakarta periode Nov 2022                                  114,450,000   105,000,000   11,550,000     2,100,000       114,450,000

                                                 MEGA AKSES PERSADA, PT, Sewa Layanan Jabalink
                                                 1Gbps P2P dari IDC Duren Tiga ke Jabalink Bali Tower
262   04-Jan-23    MANDIRI       1220011559559   Surabaya Omadata Center periode Des 2022                   25,070,000    23,000,000    2,530,000       460,000        25,070,000
263   04-Jan-23    MANDIRI       1220011559559   NTT INDONESIA, PT, Sewa NTT Fiber Connect                  14,715,000    13,500,000    1,485,000       270,000        14,715,000
264   04-Jan-23    MANDIRI       1220011559559   NTT INDONESIA, PT, Sewa NTT Fiber Connect                  10,900,000    10,000,000    1,100,000       200,000        10,900,000
265   04-Jan-23    MANDIRI       1220011559559   NTT INDONESIA, PT, Sewa NTT Fiber Connect                   7,085,000     6,500,000      715,000       130,000         7,085,000
266   04-Jan-23    MANDIRI       1220011559559   NTT INDONESIA, PT, Sewa NTT Fiber Connect                  43,600,000    40,000,000    4,400,000       800,000        43,600,000
267   04-Jan-23    MANDIRI       1220011559559   NTT INDONESIA, PT, Sewa NTT Fiber Connect                   7,085,000     6,500,000      715,000       130,000         7,085,000
268   04-Jan-23    MANDIRI       1220011559559   NTT INDONESIA, PT, Sewa NTT Fiber Connect                  38,150,000    35,000,000    3,850,000       700,000        38,150,000
                                                 ASOSIASI PENYELENGGARA JASA INTERNET
                                                 INDONESIA, Uang Muka Beban Umum atas Iuran
                                                 Keanggotaan APJII Periode Januari-Desember 2023
269   05-Jan-23    MANDIRI       1220011559559   No. No. 23/01/0528 PI (ISP)                                 3,000,000     3,000,000          -             -           3,000,000
                                                 GRIYA MURIA KENCANA, PT, Biaya atas Pemakaian
                                                 Listrik di Gedung Prince Center periode 26 Nov 2022 -
270   05-Jan-23    MANDIRI       1220011559559   26 Dec 2022                                                  234,134       231,816       25,499         23,181           234,134
                                                 INTILAND DEVELOPMENT TBK, PT (JAKARTA), Biaya
                                                 atas Pemakaian Listrik di Gedung Intiland Jakarta
271   05-Jan-23    MANDIRI       1220011559559   periode 26 Oct 2022 - 25 Nov 2022                            574,218       638,019           -          63,801           574,218
                                                 ISMAWA TRIMITRA, PT, Biaya atas Pemakaian Listrik
                                                 di Graha Iskandarsyah periode 21 Nov 2022 - 21 Des
272   05-Jan-23    MANDIRI       1220011559559   2022                                                         151,812       150,308       16,534         15,030           151,812
                                                 KRAKATAU SARANA PROPERTI, PT, Biaya atas
                                                 Pemakaian Listrik di Krakatau Steel Group periode
273   05-Jan-23    MANDIRI       1220011559559   Nov 2022                                                       37,864       37,488        4,124          3,748            37,864
                                                 PERMADANI PROPERTINDO DEVELOPMENT, PT,
                                                 Biaya atas Pemakaian Listrik di Wisma Kodel periode
274   05-Jan-23    MANDIRI       1220011559559   Nov 2022                                                     212,100       210,000       23,100         21,000           212,100
                                                 CYBERINDO ADITAMA, PT, Biaya Crossconnect FO
                                                 CBN Tenant PT Keb Hana Bank KCP Central Park
275   05-Jan-23    MANDIRI       1220011559559   Bulan Des 2022                                              3,052,000     2,800,000     308,000         56,000         3,052,000
                                                 FIBER NETWORKS INDONESIA, PT, Sewa Local Loop
                                                 30 Mbps - Pergudangan Puninar Yusen Periode Des
276   05-Jan-23    MANDIRI       1220011559559   2022                                                        4,360,000     4,360,000          -             -           4,360,000
                                                 INDOSAT TBK, PT, Sewa Domestik Link Platinum 20
277   05-Jan-23    MANDIRI       1220011559559   Mbps periode Okt 2022                                       4,905,000     4,500,000     495,000         90,000         4,905,000
                                                 ITS TEKNO SAINS, PT, Tagihan Kompesansi Dasar
                                                 Kerjasama Operasi Penyedia, Pembangunan dan
                                                 Komersialisasi Infrastuktur Telekomunikasi periode
278   05-Jan-23    MANDIRI       1220011559559   Oct 2021 - Oct 2022                                       590,583,810   584,736,445   64,321,009    58,473,644       590,583,810
                                                 MEGA AKSES PERSADA, PT, Sewa Layanan Jabalink
                                                 500Mbps (Fiberstar) Intercity Jakarta - Diskominfo
279   05-Jan-23    MANDIRI       1220011559559   Cirebon periode Des 2022                                    8,720,000     8,000,000     880,000        160,000         8,720,000
                                                 PENGEMBANGAN PARIWISATA INDONESIA, PT,
                                                 Penggantian Biaya Listrik Bulan Oktober dan
280   05-Jan-23    MANDIRI       1220011559559   November 2022 site BTDC                                    17,492,442    17,492,442          -             -          17,492,442
                                                 JALA LINTAS MEDIA, PT, Sewa Local Loop IDC to PT.
                                                 Darya Varia Laboratoria 10 Mbps VLAN/LAN Baru
281   05-Jan-23    MANDIRI       1220011559559   Periode Des 2022                                            2,180,000     2,000,000     220,000         40,000         2,180,000
                                                 TOWER OPERATION, Uang Muka Beban Umum atas
                                                 Biaya Paket Data Pascabayar Telkomsel Mikrotik
                                                 untuk Monitoring Alarm. Periode Januari 2023 Jawa
282   05-Jan-23    MANDIRI       1220011559559   Tengah - Trf                                                1,609,500     1,609,500          -             -           1,609,500
                                                 BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
                                                 Penarikan Kabel FO Cut Impact Penebangan Pohon
283   05-Jan-23    MANDIRI       1220011559559   site MP Jatinegara-001                                      2,044,134     2,096,547          -          52,413         2,044,134
                                                 BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
                                                 Penarikan Kabel FO Cut Impact Kabel Tertabrak Truck
284   05-Jan-23    MANDIRI       1220011559559   site MP Cipete Utara-001                                    1,987,194     2,038,147          -          50,953         1,987,194
                                                 BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
                                                 Penarikan Kabel FO Cut Impact Kabel Tertabrak Truck
285   05-Jan-23    MANDIRI       1220011559559   site Tugu Selatan-003                                       2,043,354     2,095,747          -          52,393         2,043,354
                                                 BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
                                                 Penarikan Kabel FO Cut Impact Tertabrak kendaraan
286   05-Jan-23    MANDIRI       1220011559559   site MP Ragunan-001                                         1,491,894     1,530,147          -          38,253         1,491,894
                                                 CHALISTA JAYA UTAMA, PT, Biaya pembelian 40 pcs
287   06-Jan-23   SINARMAS        0002999994     carabiner galvanized 10mm                                   1,350,000     1,350,000          -             -           1,350,000
                                                 FPU PENJAGA SITE, Pembayaran Penjaga Site dan
288   06-Jan-23   SINARMAS        0002999994     Uang Canang Bulan Desember 2022                             2,400,000     2,400,000          -             -           2,400,000
                                                 JEJARING ULTRA PRIMA, PT, Biaya Sewa Penempatan
                                                 Perangkat Telekomunikasi di Kawasan Summarecon
                                                 Residential Berdasarkan Profit Sharing Oktober 2021 -
289   06-Jan-23     BCA           3193058058     Desember 2021                                             127,687,713   126,423,478   13,906,583    12,642,348       127,687,713
                                                 IRWAN PRADNYA DESIGN, Ud, Biaya Cetak Spanduk
                                                 ,mini x Banner dan biaya Cetak roll up banner untuk
290   06-Jan-23   SINARMAS        0002999994     Promosi                                                     1,862,250     1,910,000          -          47,750         1,862,250
Page 48
      TANGGAL
    PENGELUARAN                 NOMOR REKENING
       DI BANK  REKENING BANK     BANK YANG                                                            NILAI MUTASI                   NILAI YANG DIBAYARKAN
NO.  STATEMENT YANG DIGUNAKAN     DIGUNAKAN               NAMA VENDOR DAN KETERANGAN                      BANK          DPP           PPN             PPh       NET DIBAYARKAN
                                                 MULIA INTIPELANGI, PT, Biaya supervisi pekerjaan
                                                 troubleshoot di ruang servis Mall Taman Anggrek tgl
291   06-Jan-23    MANDIRI       1220011559559   10 Nov 2022 (Inv: 2022110275 & 2022110276)                 272,700       279,900       19,800         27,000           272,700
                                                 AREA GIANYAR, Biaya Retribusi desa Kenderan
292   06-Jan-23   SINARMAS        0002999994     periode Desember 2022 site GNY08 Gentong                  1,000,000     1,000,000          -             -           1,000,000
                                                 NI PUTU DHIAN IRMASARI, SH.,M.Kn, Mrs., Biaya
                                                 penyusunan akta perjanjian perpanjangan sewa
293   06-Jan-23   SINARMAS        0002999994     lahan site 41 Ritz Carlton                                1,500,000     1,538,462          -          38,462         1,500,000
                                                 NI PUTU DHIAN IRMASARI, SH.,M.Kn, Mrs., Biaya
                                                 penyusunan akta perjanjian perpanjangan sewa
294   06-Jan-23   SINARMAS        0002999994     lahan site 14 Pererenan                                   1,500,000     1,538,462          -          38,462         1,500,000
                                                 NI PUTU DHIAN IRMASARI, SH.,M.Kn, Mrs., Biaya
                                                 penyusunan akta perjanjian perpanjangan sewa
295   06-Jan-23   SINARMAS        0002999994     lahan site 35 Sangeh                                      1,500,000     1,538,462          -          38,462         1,500,000
                                                 DIAN MUSTIKA AGUNG, PT, Pembelian Cable Ties
                                                 Nylon 9x550MM Black 6 Pcs, Kuas Roll Cat Besar 9
296   09-Jan-23    MANDIRI       1220011559559   Inch 10 Pcs, Bak Cat Roll besar 9 Inch 5 Pcs              1,365,300     1,230,000     135,300            -           1,365,300
                                                 BENTENG ANUGERAH ASIH, PT, Biaya Pengiriman
                                                 Material Return FO JW B2 dari PT Blao Prima Perkasa
297   09-Jan-23    MANDIRI       1220011559559   ke WH Serpong                                             1,436,950     1,450,000      15,950         29,000         1,436,950
                                                 IPROAD INTERNASIONAL INDONESIA, PT, Biaya
298   09-Jan-23    MANDIRI       1220011559559   Service ONT Alcatel Lucent sebanyak 552 Unit            135,378,000   124,200,000   13,662,000     2,484,000       135,378,000
                                                 PERSADA BATAVIA MANDIRI, PT, Biaya Pengiriman
                                                 Material ONT dari WH Serpong ke WH Cipulir, Ruko
299   09-Jan-23    MANDIRI       1220011559559   Green Mansion dan WH Matraman                             1,436,950     1,450,000      15,950         29,000         1,436,950
                                                 PERSADA BATAVIA MANDIRI, PT, Biaya Pengiriman
                                                 Material ONT dari WH Serpong ke WH Cipulir, Ruko
300   09-Jan-23    MANDIRI       1220011559559   Green Mansion dan WH Matraman                             1,288,300     1,300,000      14,300         26,000         1,288,300
                                                 PERSADA BATAVIA MANDIRI, PT, Biaya Pengiriman
                                                 Material ONT dari WH Serpong ke WH Cipulir, Ruko
301   09-Jan-23    MANDIRI       1220011559559   Green Mansion dan WH Matraman                             1,189,200     1,200,000      13,200         24,000         1,189,200
                                                 CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                 Material Cable dari WH Serpong ke WH Cipulir dan
302   09-Jan-23    MANDIRI       1220011559559   Ruko Green Mansion                                         743,250       750,000        8,250         15,000           743,250
                                                 CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                 Material Cable dari WH Serpong ke WH Cipulir dan
303   09-Jan-23    MANDIRI       1220011559559   Ruko Green Mansion                                         495,500       500,000        5,500         10,000           495,500
                                                 CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                 Material Plate Setting, Anchor dari PT DHJ ke WH
304   09-Jan-23    MANDIRI       1220011559559   Serpong                                                    495,500       500,000        5,500         10,000           495,500
                                                 JASATAMA DIRGANTARA EKSPRESS LOGISTIK, PT,
                                                 Biaya Pengiriman Material Cable Network UTP dari
305   09-Jan-23    MANDIRI       1220011559559   WH Serpong ke WH Penjernihan                               495,500       500,000        5,500         10,000           495,500
                                                 PERSADA BATAVIA MANDIRI, PT, Biaya Pengiriman
                                                 Material Rectifier & CCTV dari WH Serpong ke WH
306   09-Jan-23    MANDIRI       1220011559559   Bali                                                      6,590,150     6,650,000      73,150        133,000         6,590,150
                                                 SANTA MULTI SEMESTA, PT, Tagihan 100% atas
307   09-Jan-23    MANDIRI       1220011559559   Pekerjaan Penarikan Kabel FO                              2,930,393     2,738,685     301,255        109,547         2,930,393
                                                 SANTA MULTI SEMESTA, PT, Tagihan 100% atas
308   09-Jan-23    MANDIRI       1220011559559   Pekerjaan Penarikan Kabel FO                              3,870,494     3,617,284     397,901        144,691         3,870,494
                                                 SANTA MULTI SEMESTA, PT, Tagihan 100% atas
309   09-Jan-23    MANDIRI       1220011559559   Pekerjaan Penarikan Kabel FO                              3,927,204     3,670,284     403,731        146,811         3,927,204
                                                 SANTA MULTI SEMESTA, PT, Tagihan 100% atas
310   09-Jan-23    MANDIRI       1220011559559   Pekerjaan Penarikan Kabel FO                              3,635,094     3,397,284     373,701        135,891         3,635,094
                                                 SANTA MULTI SEMESTA, PT, Tagihan 100% atas
311   09-Jan-23    MANDIRI       1220011559559   Pekerjaan Penarikan Kabel FO                              2,364,362     2,209,684     243,065         88,387         2,364,362
                                                 SANTA MULTI SEMESTA, PT, Pekerjaan Penarikan
312   09-Jan-23    MANDIRI       1220011559559   Jalur FO Ducting dan Site Patroli Jovis SF                2,872,398     2,684,484     295,293        107,379         2,872,398
                                                 SANTA MULTI SEMESTA, PT, Pekerjaan Penarikan
313   09-Jan-23    MANDIRI       1220011559559   Jalur FO Ducting dan Site Patroli Jovis SF                2,234,892     2,088,684     229,755         83,547         2,234,892
                                                 SANTA MULTI SEMESTA, PT, Pekerjaan Penarikan
314   09-Jan-23    MANDIRI       1220011559559   Jalur FO Ducting dan Site Patroli Jovis SF               21,254,570    19,864,084    2,185,049       794,563        21,254,570
                                                 SANTA MULTI SEMESTA, PT, Tagihan 100% atas
315   09-Jan-23    MANDIRI       1220011559559   Pekerjaan Penarikan Kabel FO                              2,599,762     2,429,684     267,265         97,187         2,599,762
                                                 SANTA MULTI SEMESTA, PT, Tagihan 100% atas
316   09-Jan-23    MANDIRI       1220011559559   Pekerjaan Penarikan Kabel FO                              2,730,302     2,551,684     280,685        102,067         2,730,302
                                                 SANTA MULTI SEMESTA, PT, Tagihan 100% atas
317   09-Jan-23    MANDIRI       1220011559559   Pekerjaan Penarikan Kabel FO                              3,096,242     2,893,684     318,305        115,747         3,096,242
                                                 TOWER OPERATION, Uang Muka Beban Umum atas
                                                 Biaya Tagihan Susulan P2TL Karena Pergantian KWH
                                                 yang rusak site Panjang wetan-001 Jawa Tengah (Ada
318   09-Jan-23    MANDIRI       1220011559559   Pemasangan CCTV) - Trf                                     710,359       710,359           -             -             710,359
                                                 SANTA MULTI SEMESTA, PT, Tagihan 100% atas
319   09-Jan-23    MANDIRI       1220011559559   Pekerjaan Pemasangan Tiang FO                             4,235,792     3,958,684     435,455        158,347         4,235,792
                                                 SANTA MULTI SEMESTA, PT, Tagihan 100% atas
320   09-Jan-23    MANDIRI       1220011559559   Pekerjaan Pemasangan Tiang FO                            18,051,419    16,870,485    1,855,753       674,819        18,051,419
                                                 SANTA MULTI SEMESTA, PT, Tagihan 100% atas
321   09-Jan-23    MANDIRI       1220011559559   Pekerjaan Pemasangan Tiang FO                             2,260,572     2,112,684     232,395         84,507         2,260,572
                                                 SANTA MULTI SEMESTA, PT, Tagihan 100% atas
322   09-Jan-23    MANDIRI       1220011559559   Pekerjaan Pemasangan Tiang FO                            13,864,722    12,957,684    1,425,345       518,307        13,864,722
                                                 SANTA MULTI SEMESTA, PT, Tagihan 100% atas
323   09-Jan-23    MANDIRI       1220011559559   Pekerjaan Pemasangan Tiang FO                             5,303,156     4,956,221     545,184        198,249         5,303,156
                                                 SANTA MULTI SEMESTA, PT, Tagihan 100% atas
324   09-Jan-23    MANDIRI       1220011559559   Pekerjaan Pemasangan Tiang FO                            12,005,850    11,220,421    1,234,246       448,817        12,005,850
                                                 SANTA MULTI SEMESTA, PT, Tagihan 100% atas
325   09-Jan-23    MANDIRI       1220011559559   Pekerjaan Pemasangan Tiang FO                            10,258,112     9,587,021    1,054,572       383,481        10,258,112
                                                 SANTA MULTI SEMESTA, PT, Tagihan 100% atas
326   09-Jan-23    MANDIRI       1220011559559   Pekerjaan Pemasangan Tiang FO                             5,838,224     5,456,284     600,191        218,251         5,838,224
                                                 SANTA MULTI SEMESTA, PT, Tagihan 100% atas
327   09-Jan-23    MANDIRI       1220011559559   Pekerjaan Pemasangan Tiang FO                             6,768,268     6,325,484     695,803        253,019         6,768,268
                                                 SANTA MULTI SEMESTA, PT, Tagihan 100% atas
328   09-Jan-23    MANDIRI       1220011559559   Pekerjaan Pemasangan Tiang FO                             2,118,262     1,979,684     217,765         79,187         2,118,262
                                                 SANTA MULTI SEMESTA, PT, Tagihan 100% atas
329   09-Jan-23    MANDIRI       1220011559559   Pekerjaan Pemasangan Tiang FO                            27,629,202    25,821,684    2,840,385     1,032,867        27,629,202
Page 49
      TANGGAL
    PENGELUARAN                 NOMOR REKENING
       DI BANK  REKENING BANK     BANK YANG                                                            NILAI MUTASI                 NILAI YANG DIBAYARKAN
NO.  STATEMENT YANG DIGUNAKAN     DIGUNAKAN              NAMA VENDOR DAN KETERANGAN                       BANK         DPP          PPN             PPh       NET DIBAYARKAN
                                                 SANTA MULTI SEMESTA, PT, Tagihan 100% atas
330   09-Jan-23    MANDIRI       1220011559559   Pekerjaan Pemasangan Tiang FO                             8,027,590    7,502,421    825,266        300,097         8,027,590
                                                 SANTA MULTI SEMESTA, PT, Tagihan 100% atas
331   09-Jan-23    MANDIRI       1220011559559   Pekerjaan Pemasangan Tiang FO                             7,082,206    6,618,884    728,077        264,755         7,082,206
                                                 SANTA MULTI SEMESTA, PT, Tagihan 100% atas
332   09-Jan-23    MANDIRI       1220011559559   Pekerjaan Pemasangan Tiang FO                             6,468,882    6,045,684    665,025        241,827         6,468,882
                                                 SANTA MULTI SEMESTA, PT, Tagihan 100% atas
333   09-Jan-23    MANDIRI       1220011559559   Pekerjaan Pemasangan Tiang FO                             4,123,442    3,853,684    423,905        154,147         4,123,442
                                                 SANTA MULTI SEMESTA, PT, Tagihan 100% atas
334   09-Jan-23    MANDIRI       1220011559559   Pekerjaan Pemasangan Tiang FO                             5,778,000    5,400,000    594,000        216,000         5,778,000
                                                 SANTA MULTI SEMESTA, PT, Tagihan 100% atas
335   09-Jan-23    MANDIRI       1220011559559   Pekerjaan Pemasangan Tiang FO                             2,554,822    2,387,684    262,645         95,507         2,554,822
                                                 BENTENG ANUGERAH ASIH, PT, Biaya Pengiriman
                                                 Material Subduct HDPE 40/34 dari PT Alpha Cikupa
336   09-Jan-23    MANDIRI       1220011559559   Makmur ke WH Serpong                                      1,025,685    1,035,000     11,385         20,700         1,025,685

                                                 TECHNICAL, Uang Muka Beban Umum atas Biaya
                                                 Operasional Pembelian Kebutuhan Trial CCTV 3MP
337   09-Jan-23    MANDIRI       1220011559559   dan 5MP di Jakarta (IM : 001/R&D/IM/XII/2022) - Trf      10,000,000   10,000,000         -             -          10,000,000
                                                 FPU PENJAGA SITE, Pembayaran Penjaga Site dan
                                                 Uang Canang Bulan Desember 2022 (Transfer Bank
338   10-Jan-23   SINARMAS        0000240408     Sinarmas di 65 Site BTS)                                 38,200,000   38,200,000         -             -          38,200,000
                                                 BUMI MULIA PERKASA DEVELOPMENT, PT, Biaya atas
                                                 Pemakaian Listrik di Gedung Atrium Mulia periode
339   10-Jan-23    MANDIRI       1220011559559   Desember 2022                                              232,423      230,122      25,313         23,012           232,423
                                                 CYBER TEKNOLOGI PUTRAWAN, PT, Tagihan Revenue
                                                 Sharing atas Pendapatan Penggunaan Jaringan Kabel
                                                 Fiber Optik periode Juni - November 2022 di Bali
340   10-Jan-23    MANDIRI       1220011559559   Pecatu Graha New Kuta Beach                              24,481,400   22,460,000   2,470,600       449,200        24,481,400
                                                 GRIYA MURIA KENCANA, PT, Tagihan Revenue
                                                 Sharing periode November 2022 atas Penempatan
341   10-Jan-23    MANDIRI       1220011559559   Perangkat Telekomunikasi di Gedung Prince Center           737,300      730,000      80,300         73,000           737,300
                                                 LESTARI MAHADIBYA, PT, Biaya Pemakaian Listrik di
                                                 Summarecon Mal Serpong 2 periode 11 Okt 2022 -
342   10-Jan-23    MANDIRI       1220011559559   10 Nov 2022                                                287,059      284,216      31,264         28,421           287,059
                                                 LESTARI MAHADIBYA, PT, Biaya Pemakaian Listrik di
                                                 Summarecon Mal Serpong 2 periode 11 Okt 2022 -
343   10-Jan-23    MANDIRI       1220011559559   10 Nov 2022                                                337,584      334,241      36,767         33,424           337,584
                                                 LESTARI MAHADIBYA, PT, Biaya Pemakaian Listrik di
                                                 Summarecon Mal Serpong 2 periode 11 Okt 2022 -
344   10-Jan-23    MANDIRI       1220011559559   10 Nov 2022                                                340,641      337,268      37,099         33,726           340,641
                                                 LESTARI MAHADIBYA, PT, Biaya Pemakaian Listrik di
                                                 Summarecon Mal Serpong 2 periode 11 Okt 2022 -
345   10-Jan-23    MANDIRI       1220011559559   10 Nov 2022                                                284,946      282,124      31,034         28,212           284,946
                                                 LESTARI MAHADIBYA, PT, Biaya Pemakaian Listrik di
                                                 Summarecon Mal Serpong 2 periode 11 Okt 2022 -
346   10-Jan-23    MANDIRI       1220011559559   10 Nov 2022                                               1,009,964     999,964     109,996         99,996         1,009,964
                                                 LESTARI MAHADIBYA, PT, Biaya Pemakaian Listrik di
                                                 Summarecon Mal Serpong 2 periode 11 Okt 2022 -
347   10-Jan-23    MANDIRI       1220011559559   10 Nov 2022                                                706,073      699,082      76,899         69,908           706,073
                                                 LESTARI MAHADIBYA, PT, Biaya Pemakaian Listrik di
                                                 Summarecon Mal Serpong 2 periode 11 Okt 2022 -
348   10-Jan-23    MANDIRI       1220011559559   10 Nov 2022                                                993,281      983,446     108,179         98,344           993,281
                                                 LESTARI MAHADIBYA, PT, Biaya Pemakaian Listrik di
                                                 Summarecon Mal Serpong 2 periode 11 Okt 2022 -
349   10-Jan-23    MANDIRI       1220011559559   10 Nov 2022                                                  83,719      82,889       9,118          8,288            83,719
                                                 MAKMUR ORIENT JAYA, PT, Biaya Pemakaian Listrik
                                                 di Gedung Sentra Summarecon Bekasi Ruang Panel
350   10-Jan-23    MANDIRI       1220011559559   BZ3 periode 13 Nov 2022 - 12 Dec 2022                      460,157      455,601      50,116         45,560           460,157
                                                 MAKMUR ORIENT JAYA, PT, Biaya Pemakaian Listrik
                                                 di Gedung Sentra Summarecon Bekasi Ruang Panel
351   10-Jan-23    MANDIRI       1220011559559   BZ3 periode 13 Nov 2022 - 12 Dec 2022                      146,643      145,191      15,971         14,519           146,643
                                                 MAKMUR ORIENT JAYA, PT, Biaya Pemakaian Listrik
                                                 di Gedung Sentra Summarecon Bekasi Ruang Panel
352   10-Jan-23    MANDIRI       1220011559559   BZ3 periode 13 Nov 2022 - 12 Dec 2022                      159,216      157,640      17,340         15,764           159,216
                                                 MAKMUR ORIENT JAYA, PT, Biaya Pemakaian Listrik
                                                 di Gedung Sentra Summarecon Bekasi Ruang Panel
353   10-Jan-23    MANDIRI       1220011559559   BZ3 periode 13 Nov 2022 - 12 Dec 2022                      323,564      320,360      35,240         32,036           323,564
                                                 MAKMUR ORIENT JAYA, PT, Biaya Pemakaian Listrik
                                                 di Gedung Sentra Summarecon Bekasi Ruang Panel
354   10-Jan-23    MANDIRI       1220011559559   BZ3 periode 13 Nov 2022 - 12 Dec 2022                      135,040      133,703      14,707         13,370           135,040
                                                 MAKMUR ORIENT JAYA, PT, Biaya Pemakaian Listrik
                                                 di Gedung Sentra Summarecon Bekasi Ruang Panel
355   10-Jan-23    MANDIRI       1220011559559   BZ3 periode 13 Nov 2022 - 12 Dec 2022                      172,508      170,800      18,788         17,080           172,508
                                                 MAKMUR ORIENT JAYA, PT, Biaya Pemakaian Listrik
                                                 di Gedung Sentra Summarecon Bekasi Ruang Panel
356   10-Jan-23    MANDIRI       1220011559559   BZ3 periode 13 Nov 2022 - 12 Dec 2022                      535,252      529,952      58,295         52,995           535,252
                                                 MAKMUR ORIENT JAYA, PT, Biaya Pemakaian Listrik
                                                 di Gedung Sentra Summarecon Bekasi Ruang Panel
357   10-Jan-23    MANDIRI       1220011559559   BZ3 periode 13 Nov 2022 - 12 Dec 2022                      103,726      102,698      11,297         10,269           103,726
                                                 MENARA PRAMBANAN, PT, Biaya atas Pemakaian
                                                 Listrik di Apartement Poins Square periode
358   10-Jan-23    MANDIRI       1220011559559   Desember 2022                                              234,124      260,137          -          26,013           234,124
                                                 PERHIMPUNAN PEMILIK DAN PENGHUNI SATUAN
                                                 RUMAH RUSUN SPAZIO, Biaya atas Pemakaian Listrik
                                                 & Admin di Rusun Spazio periode 21 November 2022
359   10-Jan-23    MANDIRI       1220011559559   - 20 Desember 2022                                         146,603      146,870          -            267            146,603
                                                 PERHIMPUNAN PENGHUNI KONDOMINIUM
                                                 PERKANTORAN GRAHA SURVEYOR INDONESIA, Biaya
                                                 atas Pemakaian Listrik di Gedung Surveyor Lt. P2
360   10-Jan-23    MANDIRI       1220011559559   periode22 Nov 2022 - 22 Dec 2022                           319,821      355,356          -          35,535           319,821
                                                 PERHIMPUNAN PENGHUNI KONDOMINIUM
                                                 PERKANTORAN GRAHA SURVEYOR INDONESIA, Biaya
                                                 atas Pemakaian Listrik di Gedung Surveyor Lt. P2
361   10-Jan-23    MANDIRI       1220011559559   periode22 Nov 2022 - 22 Dec 2022                           314,235      349,149          -          34,914           314,235
Page 50
      TANGGAL
    PENGELUARAN                 NOMOR REKENING
       DI BANK  REKENING BANK     BANK YANG                                                              NILAI MUTASI                   NILAI YANG DIBAYARKAN
NO.  STATEMENT YANG DIGUNAKAN     DIGUNAKAN              NAMA VENDOR DAN KETERANGAN                         BANK          DPP           PPN             PPh       NET DIBAYARKAN

                                                 INFRASTRUKTUR BISNIS SEJAHTERA, PT, Jasa Penguat
                                                 Sinyal untuk Tenant di Gedung The Gedung MSIG,
                                                 The Plaza Office Tower, The Plaza Shopping Center
362   10-Jan-23    MANDIRI       1220011559559   Berdasarkan Profit Sharing November 2022                   35,575,500    32,050,000    3,525,500           -          35,575,500

                                                 INFRASTRUKTUR BISNIS SEJAHTERA, PT, Jasa Penguat
                                                 Sinyal untuk Tenant di Gedung The Gedung MSIG,
                                                 The Plaza Office Tower, The Plaza Shopping Center
363   10-Jan-23    MANDIRI       1220011559559   Berdasarkan Profit Sharing November 2022                   20,753,419    18,696,774    2,056,645           -          20,753,419

                                                 INFRASTRUKTUR BISNIS SEJAHTERA, PT, Jasa Penguat
                                                 Sinyal untuk Tenant di Gedung The Gedung MSIG,
                                                 The Plaza Office Tower, The Plaza Shopping Center
364   10-Jan-23    MANDIRI       1220011559559   Berdasarkan Profit Sharing November 2022                   36,312,218    32,713,710    3,598,508           -          36,312,218
                                                 JELAJAH DATA SEMESTA, PT, Dedicated Internet
365   10-Jan-23   SINARMAS        0000240408     Bandwidth periode Des 2022                                539,550,000   495,000,000   54,450,000     9,900,000       539,550,000
                                                 CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                 Material dari PT Assalamah Cahaya Sakti ke WH
                                                 Serpong, Biaya Pengiriman Material CCTV dari PT
366   10-Jan-23    MANDIRI       1220011559559   Prysmian Cable ke PT Morasha Inti                           2,477,500     2,500,000      27,500         50,000         2,477,500
                                                 CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                 Material dari PT Assalamah Cahaya Sakti ke WH
                                                 Serpong, Biaya Pengiriman Material CCTV dari PT
367   10-Jan-23    MANDIRI       1220011559559   Prysmian Cable ke PT Morasha Inti                            991,000      1,000,000      11,000         20,000           991,000
                                                 CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                 Material dari PT Assalamah Cahaya Sakti ke WH
                                                 Serpong, Biaya Pengiriman Material CCTV dari PT
368   10-Jan-23    MANDIRI       1220011559559   Prysmian Cable ke PT Morasha Inti                            495,500       500,000        5,500         10,000           495,500
                                                 CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                 Material dari PT Assalamah Cahaya Sakti ke WH
                                                 Serpong, Biaya Pengiriman Material CCTV dari PT
369   10-Jan-23    MANDIRI       1220011559559   Prysmian Cable ke PT Morasha Inti                            495,500       500,000        5,500         10,000           495,500
                                                 CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                 Material dari PT Assalamah Cahaya Sakti ke WH
                                                 Serpong, Biaya Pengiriman Material CCTV dari PT
370   10-Jan-23    MANDIRI       1220011559559   Prysmian Cable ke PT Morasha Inti                            495,500       500,000        5,500         10,000           495,500
                                                 CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                 Material dari PT Assalamah Cahaya Sakti ke WH
                                                 Serpong, Biaya Pengiriman Material CCTV dari PT
371   10-Jan-23    MANDIRI       1220011559559   Prysmian Cable ke PT Morasha Inti                            495,500       500,000        5,500         10,000           495,500
                                                 CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                 Material dari PT Assalamah Cahaya Sakti ke WH
                                                 Serpong, Biaya Pengiriman Material CCTV dari PT
372   10-Jan-23    MANDIRI       1220011559559   Prysmian Cable ke PT Morasha Inti                            495,500       500,000        5,500         10,000           495,500

                                                 BALI PECATU GRAHA, PT, Biaya pembayaran tagihan
373   12-Jan-23   SINARMAS        0002999994     listrik dan IPL BPG pemakaian bulan Desember 2022          12,655,066    12,655,066          -             -          12,655,066
                                                 BALI PECATU GRAHA, PT, Pembayaran tagihan pajak
                                                 PBB site M_101 Puncak Nuri dan M_102 Wuku Hotel
374   12-Jan-23   SINARMAS        0002999994     BPG Tahun 2017-2022                                         5,013,902     5,013,902          -             -           5,013,902

                                                 MULIA INTIPELANGI, PT, Biaya atas Pemakaian Listrik
375   12-Jan-23    MANDIRI       1220011559559   Mall Taman Anggrek (GL-L5) Periode Dec 2022                 3,896,910     3,858,326     424,416        385,832         3,896,910
                                                 SENAYAN TRIKARYA SEMPANA, PT, Biaya Pemakaian
376   12-Jan-23    MANDIRI       1220011559559   Listrik                                                      405,192       401,180       44,130         40,118           405,192
                                                 SENAYAN TRIKARYA SEMPANA, PT, Biaya Pemakaian
377   12-Jan-23    MANDIRI       1220011559559   Listrik                                                        87,031       86,170        9,478          8,617            87,031
                                                 SENAYAN TRIKARYA SEMPANA, PT, Biaya Pemakaian
378   12-Jan-23    MANDIRI       1220011559559   Listrik                                                        76,861       76,100        8,371          7,610            76,861
                                                 BIBIT, Mr, Biaya Pekerjaan Perbaikan Kabel Landai
379   12-Jan-23   SINARMAS        0002999994     karena asesoris terlepas di Cluster Teras Hijau             1,068,266     1,101,305          -          33,039         1,068,266
                                                 AMAZANA KENCANA, PT, Biaya atas Pemakaian
380   13-Jan-23     BCA           3193058058     Listrik Apartemen Amazana Periode Dec 2022                   369,577       339,062       37,296          6,781           369,577
                                                 DUNIA MAKMUR PROPERTI, PT, Biaya atas
                                                 Pemakaian Listrik di Plaza Summarecon Bekasi
381   13-Jan-23     BCA           3193058058     Periode Dec 2022                                             630,404       624,162       68,658         62,416           630,404
                                                 INDOKARYA SUKSES BERSAMA, PT, Biaya atas
                                                 pemakaian listrik di apartement pluit sea 21 nov 22 -
382   13-Jan-23    MANDIRI       1220011559559   26 dec 22                                                   1,351,749     1,501,943          -         150,194         1,351,749
                                                 KHARISMA INTAN PROPERTI, PT, Biaya atas
                                                 Pemakaian Listrik di Scientia Business Park periode
383   13-Jan-23     BCA           3193058058     Dec 2022                                                     179,584       177,805       19,559         17,780           179,584
                                                 MENARA CAPITAL INDONUSA, PT, Biaya atas
                                                 Pemakaian Listrik Gedung Palma Tower lt. B1
384   13-Jan-23    MANDIRI       1220011559559   periode Dec 2022                                             103,048       102,027       11,223         10,202           103,048
                                                 MENARA CAPITAL INDONUSA, PT, Biaya atas
                                                 Pemakaian Listrik Gedung Palma Tower lt. B1
385   13-Jan-23    MANDIRI       1220011559559   periode Dec 2022                                             103,048       102,027       11,223         10,202           103,048
                                                 MUSTIKA RATU CENTRE, PT, Biaya atas Pemakaian
                                                 Listrik di Gedung Mustika Ratu Centre periode Dec
386   13-Jan-23    MANDIRI       1220011559559   2022                                                         151,706       150,204       16,522         15,020           151,706
                                                 NICO CENTRAL, PT, Biaya pemakaian listrik di
387   13-Jan-23    MANDIRI       1220011559559   Gedung Sona Topas tower Des 2022                             337,390       334,050       36,745         33,405           337,390
                                                 PENGELOLA PUSAT BELANJA, PT, Biaya atas
                                                 Pemakaian Listrik di Mall Bassura periode 16 Nov
388   13-Jan-23    MANDIRI       1220011559559   2022 - 15 Dec 2022                                           891,308       882,482       97,074         88,248           891,308
                                                 PPPSRSS SAHID SUDIRMAN CENTER, Biaya atas
389   13-Jan-23    MANDIRI       1220011559559   Pemakaian Listrik                                            215,843       213,706       23,507         21,370           215,843
                                                 PPPSRSS SAHID SUDIRMAN CENTER, Biaya atas
390   13-Jan-23    MANDIRI       1220011559559   Pemakaian Listrik                                            215,843       213,706       23,507         21,370           215,843
                                                 PPPSRSS SAHID SUDIRMAN CENTER, Biaya atas
391   13-Jan-23    MANDIRI       1220011559559   Pemakaian Listrik                                            224,888       222,662       24,492         22,266           224,888
Page 51
      TANGGAL
    PENGELUARAN                 NOMOR REKENING
       DI BANK  REKENING BANK     BANK YANG                                                            NILAI MUTASI                     NILAI YANG DIBAYARKAN
NO.  STATEMENT YANG DIGUNAKAN     DIGUNAKAN              NAMA VENDOR DAN KETERANGAN                       BANK            DPP           PPN             PPh       NET DIBAYARKAN
                                                 PLN PERSERO, PT, Biaya Tagihan Listrik PLN
                                                 Autodebet untuk 264 site are Bali periode Januari
392   16-Jan-23    MANDIRI       1220011559559   2023                                                  1,250,036,356   1,250,036,356          -             -        1,250,036,356
                                                 PLN PERSERO, PT, Pengajuan Token Pulsa Listrik
393   16-Jan-23    MANDIRI       1220011559559   Phase 01 Region Jawa Barat Periode Januari 2023          43,245,000     43,245,000           -             -          43,245,000
                                                 PLN PERSERO, PT, Biaya PLN Auto Debet Region Jawa
394   16-Jan-23    MANDIRI       1220011559559   Barat Periode Januari 2023                               63,732,485     63,732,485           -             -          63,732,485
                                                 PLN PERSERO, PT, Biaya Tagihan KWH PLN
                                                 Pascabayar Region Jawa Tengah Periode Januari
395   16-Jan-23    MANDIRI       1220011559559   2023                                                    165,195,502    165,195,502           -             -         165,195,502
                                                 PLN PERSERO, PT, Biaya PLN Autodebet Jawa Timur
396   16-Jan-23    MANDIRI       1220011559559   Periode Januari 2023                                    182,579,195    182,579,195           -             -         182,579,195
                                                 PLN PERSERO, PT, Biaya Tagihan KWH PLN Pasca
397   16-Jan-23    MANDIRI       1220011559559   Bayar Region Jabodetabek Periode Januari 2023         2,532,444,571   2,532,444,571          -             -        2,532,444,571
                                                 TOWER OPERATION, Uang Muka Beban Umum atas
                                                 Biaya Paket Broadband Indihome for Monitoring
                                                 (CSR) CCTV, FO not ready. Periode Januari 2023 area
398   16-Jan-23    MANDIRI       1220011559559   Yogyakarta - Trf                                          1,275,400      1,275,400           -             -           1,275,400
                                                 DUTA HITA JAYA, PT, DP 30% atas Pengadaan 2nd
                                                 Bordes MCP 21M for Maintenance OPS sebanyak 55
399   17-Jan-23    MANDIRI       1220011559559   Set                                                      33,381,035     33,381,035           -             -          33,381,035
                                                 DWIBINA PRIMA, PT, Biaya atas Pemakaian Listrik di
400   17-Jan-23    MANDIRI       1220011559559   Wisma BSG periode Dec 2022                                   87,679         86,811        9,549          8,681            87,679

                                                 GERAI LISTRIK PASAR MOBIL KEMAYORAN, Biaya
                                                 Tagihan Pascabayar untuk Site 70035 Gunung Sahari
                                                 Utara-008,700414 Gunung Sahari Utara-009 dan
401   17-Jan-23     BCA           3193058058     701015 Danau Sunter DII-003 Periode Januari 2023          5,527,129      5,639,927           -         112,798         5,527,129
                                                 GRAHA IRAMA, PT, Biaya atas Pemakaian Listrik di
                                                 Gedung Graha Irama periode 01 Dec 2022 - 01 Jan
402   17-Jan-23    MANDIRI       1220011559559   2023                                                       130,185         144,649           -          14,464           130,185
                                                 KHARISMA INTAN PROPERTI, PT, Biaya atas
                                                 Pemakaian Listrik di Scientia Business Park periode
403   17-Jan-23    MANDIRI       1220011559559   Nov 2022                                                   178,770         177,000       19,470         17,700           178,770
                                                 MULIA CEMERLANG DIAN PERSADA, PT, Biaya atas
                                                 Pemakaian Listrik di Wisma GKBI periode Desember
404   17-Jan-23    MANDIRI       1220011559559   2022                                                       517,973         512,844       56,413         51,284           517,973
                                                 PENGELOLA LANDMARK PLUIT, PT, Biaya atas
                                                 Pemakaian Listrik Landmark Pluit (GF-B) periode 16
405   17-Jan-23    MANDIRI       1220011559559   November 2022 - 15 December 2022                           122,291         121,080       13,319         12,108           122,291
                                                 PENGELOLA LANDMARK PLUIT, PT, Biaya atas
                                                 Pemakaian Listrik Landmark Pluit (GF-B) periode 16
406   17-Jan-23    MANDIRI       1220011559559   November 2022 - 15 December 2022                           154,499         152,968       16,827         15,296           154,499
                                                 PENGELOLA LANDMARK PLUIT, PT, Biaya atas
                                                 Pemakaian Listrik Landmark Pluit (GF-B) periode 16
407   17-Jan-23    MANDIRI       1220011559559   November 2022 - 15 December 2022                           135,418         134,077       14,748         13,407           135,418
                                                 PENGELOLA MASPION PLAZA GUNUNG SAHARI,
                                                 Biaya atas Pemakaian Listrik di Gedung Maspion
408   17-Jan-23    MANDIRI       1220011559559   Plaza Lt. 5A periode December 2022                         168,917         187,685           -          18,768           168,917

                                                 PERHIMPUNAN PENGHUNI GEDUNG PERKANTORAN
                                                 KIRANA TWO, Biaya atas Pemakaian Listrik di Gedung
409   17-Jan-23    MANDIRI       1220011559559   Kirana Two periode 21 Nov 2022 - 20 Dec 2022               647,878         719,864           -          71,986           647,878
                                                 PERHIMPUNAN PENGHUNI WISMA STACO, Biaya
                                                 atas Pemakaian Listrik di Wisma Staco periode Dcc
410   17-Jan-23    MANDIRI       1220011559559   2022                                                       133,102         147,891           -          14,789           133,102
                                                 PLAZA INDONESIA REALTY TBK, PT, Biaya atas
                                                 Pemakaian Listrik di Plaza Indonesia periode Dec
411   17-Jan-23     BCA           3193058058     2022                                                       659,453         652,924       71,821         65,292           659,453
                                                 PPPSRS CBD PLUIT, Biaya atas Pemakaian Listrik CBD
412   17-Jan-23    MANDIRI       1220011559559   Pluit periode Desember 2022                                332,111         332,111           -             -             332,111
                                                 PURIAMPERA INTIPRATAMA, PT, Biaya atas
                                                 Pemakaian Listrik di Gedung Ad Premier Periode Dec
413   17-Jan-23    MANDIRI       1220011559559   2022                                                       233,382         231,072       25,417         23,107           233,382
                                                 SERPONG CIPTA KREASI, PT, Biaya atas Pemakaian
                                                 Listrik di Plaza Summarecon Serpong periode Dec
414   17-Jan-23    MANDIRI       1220011559559   2022                                                       950,654         941,241      103,537         94,124           950,654
                                                 SUMMARECON AGUNG, PT, Biaya atas Pemakaian
415   17-Jan-23     BCA           3193058058     Listrik di The Kensington periode Desember 2022            174,669         172,939       19,023         17,293           174,669

                                                 TRI PURA INDAH PERSADA, PT, Biaya atas Pemakaian
416   17-Jan-23    MANDIRI       1220011559559   Listrik Gd. Wirausaha Kuningan Periode Dec 2022            307,202         304,160       33,458         30,416           307,202
                                                 WIJAYA KARYA REALTY, PT, Biaya atas Pemakaian
                                                 Listrik di Gedung Tamansari Parama Periode 01
417   17-Jan-23    MANDIRI       1220011559559   December 2022 - 31 December 2022                          1,206,697      1,231,323           -          24,626         1,206,697
                                                 WIJAYA KARYA REALTY, PT, Tagihan Revenue Sharing
                                                 di Gedung Tamansari Parama Boutique Office
418   17-Jan-23    MANDIRI       1220011559559   periode September 2022                                     376,050         345,000       37,950          6,900           376,050

                                                 INFRASTRUKTUR BISNIS SEJAHTERA, PT, Jasa Penguat
                                                 Sinyal untuk Tenant di Gedung The Gedung MSIG
419   17-Jan-23   SINARMAS        0000240408     Berdasarkan Profit Sharing Oktober 2022                  67,210,500     60,550,000     6,660,500           -          67,210,500

                                                 INFRASTRUKTUR BISNIS SEJAHTERA, PT, Jasa Penguat
                                                 Sinyal untuk Tenant di Gedung The Gedung MSIG
420   17-Jan-23   SINARMAS        0000240408     Berdasarkan Profit Sharing Oktober 2022                  91,954,250     82,841,667     9,112,583           -          91,954,250
                                                 PGAS TELEKOMUNIKASI NUSANTARA, PT, Tagihan
                                                 Sewa IPLC Jakarta - Equinix Singapore periode Des
421   17-Jan-23    MANDIRI       1220011559559   2022                                                    359,700,000    330,000,000    36,300,000     6,600,000       359,700,000
                                                 INTI ALGORITMA PERDANA, PT, Tagihan
                                                 Management Fee atas Revenue Sharing periode
                                                 Januari - September 2022 di Apartement 1Park
422   18-Jan-23    MANDIRI       1220011559559   Avenue                                                    3,409,212      3,127,717      344,049         62,554         3,409,212
                                                 MONETI INDO TEKNO, PT, Pembelian Bracket Dead
423   18-Jan-23    MANDIRI       1220011559559   End Noise D 70-95MM 96 Core Sebanyak 30 Set                461,760         416,000       45,760            -             461,760
Page 52
      TANGGAL
    PENGELUARAN                  NOMOR REKENING
       DI BANK  REKENING BANK      BANK YANG                                                            NILAI MUTASI                   NILAI YANG DIBAYARKAN
NO.  STATEMENT YANG DIGUNAKAN      DIGUNAKAN               NAMA VENDOR DAN KETERANGAN                      BANK          DPP           PPN             PPh       NET DIBAYARKAN
                                                  MONETI INDO TEKNO, PT, Pembelian Bracket Dead
424   18-Jan-23     MANDIRI       1220011559559   End Noise D 70-95MM 96 Core Sebanyak 30 Set               3,829,500     3,450,000     379,500            -           3,829,500
                                                  MONETI INDO TEKNO, PT, Pembelian Bracket Dead
425   18-Jan-23     MANDIRI       1220011559559   End Noise D 70-95MM 96 Core Sebanyak 30 Set                488,400       440,000       48,400            -             488,400
                                                  MONETI INDO TEKNO, PT, Pembelian Bracket Dead
426   18-Jan-23     MANDIRI       1220011559559   End Noise D 70-95MM 96 Core Sebanyak 30 Set               1,232,100     1,110,000     122,100            -           1,232,100
                                                  MONETI INDO TEKNO, PT, Pembelian Bracket Dead
427   18-Jan-23     MANDIRI       1220011559559   End Noise D 70-95MM 96 Core Sebanyak 30 Set                477,300       430,000       47,300            -             477,300
                                                  PENGEMBANGAN PARIWISATA INDONESIA, PT,
                                                  Tagihan Kompensasi atas Pemasangan Kabel Fiber
                                                  dan Monopole Triwulan IV/2022 Periode Okt-Des
428   18-Jan-23     MANDIRI       1220011559559   2022 - PPN                                               58,577,978           -     58,577,978           -          58,577,978
                                                  PENGEMBANGAN PARIWISATA INDONESIA, PT,
                                                  Tagihan Kompensasi atas Pemasangan Kabel Fiber
                                                  dan Monopole Triwulan IV/2022 Periode Okt-Des
429   18-Jan-23     MANDIRI       1220011559559   2022 - PPN                                                8,092,814           -      8,092,814           -           8,092,814
                                                  PENGEMBANGAN PARIWISATA INDONESIA, PT,
                                                  Tagihan Kompensasi atas Pemasangan Kabel Fiber
                                                  dan Monopole Triwulan IV/2022 Periode Okt-Des
430   18-Jan-23    SINARMAS        0000670707     2022                                                    563,304,653   625,894,058          -      62,589,406       563,304,653
                                                  EQUINIX SINGAPORE PTE LTD, Biaya Sewa Rack
                                                  Colocation dan Interkoneksi Equinix Singapore
431   18-Jan-23    SINARMAS        0000240408     periode Des 2022                                        107,970,433   107,970,433          -             -         107,970,433
                                                  PPPRS KEBAGUSAN CITY, Tagihan Revenue Sharing
                                                  periode Januari - Februari 2022 di Apartement
432   18-Jan-23     MANDIRI       1220011559559   Kebagusan City                                             910,446      1,011,607          -         101,161           910,446
                                                  TELIA CARRIER SINGAPORE PTE LTD, Biaya Sewa Telia
433   18-Jan-23   SINARMAS USD     0000670707     IP Transit 3Gbps                                         36,878,400    36,878,400          -             -          36,878,400
                                                  TELIA CARRIER SINGAPORE PTE LTD, Biaya Sewa Telia
434   18-Jan-23   SINARMAS USD     0000670707     IP Transit 3Gbps                                         36,878,400    36,878,400          -             -          36,878,400
435   19-Jan-23      MANDIRI      1220011559559   DITJEN POSTEL, BHP Frekuensi radio                        7,437,182     7,437,182          -             -           7,437,182
436   19-Jan-23      MANDIRI      1220011559559   DITJEN POSTEL, BHP Frekuensi radio                        7,043,602     7,043,602          -             -           7,043,602
437   19-Jan-23      MANDIRI      1220011559559   DITJEN POSTEL, BHP Frekuensi radio                        7,043,602     7,043,602          -             -           7,043,602
438   19-Jan-23      MANDIRI      1220011559559   DITJEN POSTEL, BHP Frekuensi radio                        9,867,407     9,867,407          -             -           9,867,407
439   19-Jan-23      MANDIRI      1220011559559   DITJEN POSTEL, BHP Frekuensi radio                        9,867,407     9,867,407          -             -           9,867,407
440   19-Jan-23      MANDIRI      1220011559559   DITJEN POSTEL, BHP Frekuensi radio                        7,572,048     7,572,048          -             -           7,572,048
441   19-Jan-23      MANDIRI      1220011559559   DITJEN POSTEL, BHP Frekuensi radio                        7,572,048     7,572,048          -             -           7,572,048
442   19-Jan-23      MANDIRI      1220011559559   DITJEN POSTEL, BHP Frekuensi radio                        7,552,352     7,552,352          -             -           7,552,352
443   19-Jan-23      MANDIRI      1220011559559   DITJEN POSTEL, BHP Frekuensi radio                        7,552,352     7,552,352          -             -           7,552,352
444   19-Jan-23      MANDIRI      1220011559559   DITJEN POSTEL, BHP Frekuensi radio                        9,897,468     9,897,468          -             -           9,897,468
445   19-Jan-23      MANDIRI      1220011559559   DITJEN POSTEL, BHP Frekuensi radio                        9,897,468     9,897,468          -             -           9,897,468
446   19-Jan-23      MANDIRI      1220011559559   DITJEN POSTEL, BHP Frekuensi radio                        9,837,346     9,837,346          -             -           9,837,346
447   19-Jan-23      MANDIRI      1220011559559   DITJEN POSTEL, BHP Frekuensi radio                        9,837,346     9,837,346          -             -           9,837,346
448   19-Jan-23      MANDIRI      1220011559559   DITJEN POSTEL, BHP Frekuensi radio                        9,837,346     9,837,346          -             -           9,837,346
449   19-Jan-23      MANDIRI      1220011559559   DITJEN POSTEL, BHP Frekuensi radio                        9,837,346     9,837,346          -             -           9,837,346
450   19-Jan-23      MANDIRI      1220011559559   DITJEN POSTEL, BHP Frekuensi radio                        9,897,468     9,897,468          -             -           9,897,468
451   19-Jan-23      MANDIRI      1220011559559   DITJEN POSTEL, BHP Frekuensi radio                        9,897,468     9,897,468          -             -           9,897,468
452   19-Jan-23      MANDIRI      1220011559559   DITJEN POSTEL, BHP Frekuensi radio                        9,897,468     9,897,468          -             -           9,897,468
453   19-Jan-23      MANDIRI      1220011559559   DITJEN POSTEL, BHP Frekuensi radio                        9,897,468     9,897,468          -             -           9,897,468
454   19-Jan-23      MANDIRI      1220011559559   DITJEN POSTEL, BHP Frekuensi radio                        7,501,452     7,501,452          -             -           7,501,452
455   19-Jan-23      MANDIRI      1220011559559   DITJEN POSTEL, BHP Frekuensi radio                        7,526,330     7,526,330          -             -           7,526,330
456   19-Jan-23      MANDIRI      1220011559559   DITJEN POSTEL, BHP Frekuensi radio                        9,837,346     9,837,346          -             -           9,837,346
457   19-Jan-23      MANDIRI      1220011559559   DITJEN POSTEL, BHP Frekuensi radio                        9,837,346     9,837,346          -             -           9,837,346
458   19-Jan-23      MANDIRI      1220011559559   DITJEN POSTEL, BHP Frekuensi radio                        7,441,328     7,441,328          -             -           7,441,328
                                                  INFRA SOLUSINDO, PT, Biaya Management Fee atas
                                                  Revenue Sharing periode November 2022 di
459   19-Jan-23       BCA          3193058058     Apartement Green Pramuka                                 33,943,920    31,141,211    3,425,533       622,824        33,943,920

                                                  TOWER OPERATION, Uang Muka Beban Umum atas
                                                  Biaya Pascabayar Paket Data Mikrotik Regional Jawa
460   19-Jan-23     MANDIRI       1220011559559   Timur Periode Januari 2023 - PR : 1010031960 - Trf         582,750       582,750           -             -             582,750
                                                  PLN PERSERO, PT, Pengajuan Token Pulsa Listrik
461   20-Jan-23     MANDIRI       1220011559559   Phase 01 Region Jawa Tengah Periode Januari 2023        158,274,500   158,274,500          -             -         158,274,500
                                                  PLN PERSERO, PT, Pengajuan Token Pulsa Listrik
462   20-Jan-23     MANDIRI       1220011559559   Phase 01 Region Jabotabek Periode Januari 2023          298,228,500   298,228,500          -             -         298,228,500
                                                  PLN PERSERO, PT, Biaya Pengisian Token Listrik KWH
                                                  PLN site Sangkrah-001 Tenant H3I Periode Desember
463   20-Jan-23     MANDIRI       1220011559559   2022 Region Jawa Tengah                                    503,500       503,500           -             -             503,500
                                                  PLN PERSERO, PT, Biaya Pengisian Token Listrik KWH
                                                  PLN site Sangkrah-001 Tenant H3I Periode Desember
464   20-Jan-23     MANDIRI       1220011559559   2022 Region Jawa Tengah                                    407,000       407,000           -             -             407,000
                                                  TELEKOMUNIKASI SELULAR, PT, Biaya Top up Paket
                                                  Data Mikrotik site MP-Daeng Mohamad Ardiwinata
                                                  & Sriwijaya MP area West Java Periode Desember
465   20-Jan-23     MANDIRI       1220011559559   2022                                                       200,000       200,000           -             -             200,000
                                                  MULIA INTIPELANGI, PT, Biaya supervisi pekerjaan
466   20-Jan-23     MANDIRI       1220011559559   trobleshoot pengecekan perangkat OLT                         90,900       90,000        9,900          9,000            90,900
                                                  MULIA INTIPELANGI, PT, Biaya supervisi pekerjaan
467   20-Jan-23     MANDIRI       1220011559559   trobleshoot pengecekan perangkat OLT                       181,800       180,000       19,800         18,000           181,800
                                                  XL AXIATA TBK, PT, Biaya Top up Paket Data Mikrotik
                                                  site Tawangsari-008 Tenant Smartfren Periode
468   20-Jan-23     MANDIRI       1220011559559   Desember 2022 Region Jawa Tengah                             61,500       61,500           -             -              61,500
                                                  ANGKASA PURA SUPPORT, PT, Pembayaran Tagihan
469   24-Jan-23     MANDIRI       1220011559559   Listrik Angkasa pura                                    167,372,999   153,553,210   16,890,853     3,071,064       167,372,999
                                                  ANGKASA PURA SUPPORT, PT, Pembayaran Tagihan
470   24-Jan-23     MANDIRI       1220011559559   Listrik Angkasa pura                                     13,124,148    12,040,503    1,324,455       240,810        13,124,148
                                                  AWAN KILAT SEMESTA, PT, Tagihan Revenue Sharing
                                                  periode November 2022 atas penjualan produk
471   24-Jan-23     MANDIRI       1220011559559   BaliCloud Tenant PT Adia Pradipta Lestari                30,605,400    31,230,000          -         624,600        30,605,400

                                                  ENLIG MANDIRI SEJAHTERA, PT, Reimbursement
472   24-Jan-23     MANDIRI       1220011559559   Salary Outsource Div. Direct Sales Periode Nov 2022       3,261,600     3,240,000      26,400          4,800         3,261,600

                                                  ENLULU SUKSES MAKMUR, PT, Reimbursement
473   24-Jan-23     MANDIRI       1220011559559   Salary Outsource Div. Direct Sales Periode Des 2022      12,915,936    12,830,400     104,544         19,008        12,915,936
Page 53
      TANGGAL
    PENGELUARAN                 NOMOR REKENING
       DI BANK  REKENING BANK     BANK YANG                                                                NILAI MUTASI                   NILAI YANG DIBAYARKAN
NO.  STATEMENT YANG DIGUNAKAN     DIGUNAKAN              NAMA VENDOR DAN KETERANGAN                           BANK          DPP           PPN             PPh       NET DIBAYARKAN

                                                 ENLULU SUKSES MAKMUR, PT, Reimbursement
474   24-Jan-23    MANDIRI       1220011559559   Salary Outsource Div. Direct Sales Periode Des 2022           7,011,092     6,964,661      56,749         10,318         7,011,092
                                                 JAKARTA INTERNATIONAL EXPO, PT, Revenue Sharing
                                                 Internet Bali Towerindo periode Juli - September
475   24-Jan-23    MANDIRI       1220011559559   2022 di JIEXPO                                               76,036,587    75,283,750    8,281,212     7,528,375        76,036,587
                                                 JELAJAH DATA SEMESTA, PT, Dedicated Internet
476   24-Jan-23    MANDIRI       1220011559559   Bandwidth periode Jan 2023                                  539,550,000   495,000,000   54,450,000     9,900,000       539,550,000
                                                 PERHIMPUNAN PEMILIK DAN PENGHUNI SATUAN
                                                 RUMAH SUSUN KOMERSIAL CAMPURAN
                                                 SEMENTARA APARTEMENT SATU8 RESIDENCE,
477   24-Jan-23    MANDIRI       1220011559559   Revenue Sharing Bali Fiber                                    2,711,189     2,766,519          -          55,330         2,711,189
                                                 PERHIMPUNAN PEMILIK DAN PENGHUNI SATUAN
                                                 RUMAH SUSUN KOMERSIAL CAMPURAN
                                                 SEMENTARA APARTEMENT SATU8 RESIDENCE,
478   24-Jan-23    MANDIRI       1220011559559   Revenue Sharing Bali Fiber                                    2,542,333     2,594,217          -          51,884         2,542,333
479   24-Jan-23    MANDIRI       1220011559559   PPPRS KEBAGUSAN CITY, Tagihan Revenue Sharing                 1,052,152     1,169,058          -         116,906         1,052,152
480   24-Jan-23    MANDIRI       1220011559559   PPPRS KEBAGUSAN CITY, Tagihan Revenue Sharing                 1,588,903     1,765,448          -         176,545         1,588,903
                                                 AREA DENPASAR, Biaya retribusi banjar Adat Bumi
                                                 Asri periode Desember 2022 s.d Desember 2023 site
481   24-Jan-23   SINARMAS        0002999994     750225 Dauh Puri Klod 010                                     6,000,000     6,000,000          -             -           6,000,000
                                                 AREA GIANYAR, Biaya retribusi pungutan desa Petak
482   24-Jan-23   SINARMAS        0002999994     kaja tahun 2023_GNY 68 Petak                                  1,500,000     1,500,000          -             -           1,500,000
                                                 AREA GIANYAR, Biaya retribusi desa adat Petak
483   24-Jan-23   SINARMAS        0002999994     periode bulan Januari s.d Juni 2023_GNY 68 Petak.             4,500,000     4,500,000          -             -           4,500,000
                                                 I WAYAN SELAMET, SH, Biaya penyusunan akta
484   24-Jan-23   SINARMAS        0002999994     perjanjian perpanjangan sewa lahan M 24 BTDC01                 875,000       897,436           -          22,436           875,000
                                                 BIBIT, Mr, Biaya Pekerjaan Perbaikan FO Cut Link
                                                 Site_35 Sangeh to M_67 Taman Sangeh & Site_22
485   24-Jan-23   SINARMAS        0002999994     Bongkasa Kambang                                              2,832,400     2,920,000          -          87,600         2,832,400
486   25-Jan-23    MANDIRI       1220011559559   DITJEN POSTEL, BHP Frekuensi radio                            7,501,452     7,501,452          -             -           7,501,452
487   25-Jan-23    MANDIRI       1220011559559   DITJEN POSTEL, BHP Frekuensi radio                            7,501,452     7,501,452          -             -           7,501,452
488   25-Jan-23    MANDIRI       1220011559559   DITJEN POSTEL, BHP Frekuensi radio                            7,501,452     7,501,452          -             -           7,501,452
489   25-Jan-23    MANDIRI       1220011559559   DITJEN POSTEL, BHP Frekuensi radio                            7,012,504     7,012,504          -             -           7,012,504
490   25-Jan-23    MANDIRI       1220011559559   DITJEN POSTEL, BHP Frekuensi radio                            7,012,504     7,012,504          -             -           7,012,504
491   25-Jan-23    MANDIRI       1220011559559   DITJEN POSTEL, BHP Frekuensi radio                            7,526,330     7,526,330          -             -           7,526,330
492   25-Jan-23    MANDIRI       1220011559559   DITJEN POSTEL, BHP Frekuensi radio                            7,526,330     7,526,330          -             -           7,526,330
493   25-Jan-23    MANDIRI       1220011559559   DITJEN POSTEL, BHP Frekuensi radio                            7,526,330     7,526,330          -             -           7,526,330
                                                 ARYAVENTURA REALTY, PT, Biaya atas Pemakaian
494   25-Jan-23    MANDIRI       1220011559559   Listrik di Gedung Aryaventura periode Dec 2022                 180,493       178,706       19,657         17,870           180,493
                                                 BALI UTAMA CAKRAWALA, PT, Biaya atas Pemakaian
                                                 Listrik di Gedung Discovery Shopping Mall Periode 29
495   25-Jan-23    MANDIRI       1220011559559   Nov 2022 - 28 Dec 2022                                         189,306       187,433       20,616         18,743           189,306
                                                 BANGUNMUSTIKA INTIPERSADA, PT, Biaya atas
                                                 Pemakaian Listrik di ITC Cipulir Mas Lt. Dasar - LT. 4
496   25-Jan-23    MANDIRI       1220011559559   periode 18 Nov 2022 - 17 Dec 2022                             1,206,663     1,340,736          -         134,073         1,206,663
                                                 BANGUNMUSTIKA INTIPERSADA, PT, Biaya atas
                                                 Pemakaian Listrik dan Air di ITC CIpulir Mas Lt.
                                                 4/B.071 (Call Center) Periode 18 November 2022 - 17
497   25-Jan-23    MANDIRI       1220011559559   Desember 2022                                                 2,048,789     2,276,432          -         227,643         2,048,789
                                                 BANGUNMUSTIKA INTIPERSADA, PT, Biaya atas
                                                 Pemakaian Listrik dan Air di ITC CIpulir Mas Lt.
                                                 4/B.071 (Call Center) Periode 18 November 2022 - 17
498   25-Jan-23    MANDIRI       1220011559559   Desember 2022                                                 9,198,180    10,220,199          -       1,022,019         9,198,180
                                                 CITRA KIRANA HIJAU RETAIL, PT, Biaya atas
                                                 Pemakaian Listrik di Gedung Green Sedayu Mall
499   25-Jan-23    MANDIRI       1220011559559   General 2 Lt.GF periode Dec 2022                               232,747       213,529       23,488          4,270           232,747
                                                 CITRA KIRANA HIJAU RETAIL, PT, Biaya atas
                                                 Pemakaian Listrik di Gedung Green Sedayu Mall
500   25-Jan-23    MANDIRI       1220011559559   General 2 Lt.GF periode Dec 2022                               376,240       345,174       37,969          6,903           376,240
                                                 CITRA KIRANA HIJAU RETAIL, PT, Biaya atas
                                                 Pemakaian Listrik di Gedung Green Sedayu Mall
501   25-Jan-23    MANDIRI       1220011559559   General 2 Lt.GF periode Dec 2022                                 97,918       89,832        9,882          1,796            97,918
                                                 CITRA KIRANA HIJAU RETAIL, PT, Biaya atas
                                                 Pemakaian Listrik di Gedung Green Sedayu Mall
502   25-Jan-23    MANDIRI       1220011559559   General 2 Lt.GF periode Dec 2022                               412,711       378,633       41,650          7,572           412,711
                                                 DONNELLY PARAMITA UTAMA, PT, Biaya atas
                                                 Pemakaian Listrik di Gedung Transavia Land/Graha
503   25-Jan-23    MANDIRI       1220011559559   Paramita periode December 2022                                 305,498       302,473       33,272         30,247           305,498
                                                 DUTA TELEKOMINDO NUSANTARA, PT, Tagihan
                                                 Revenue Sharing Penempatan Jaringan dan Layanan
                                                 Bali Fiber di Apartement Tifolia Pulomas periode Juli -
504   25-Jan-23    MANDIRI       1220011559559   September 2022                                               11,818,670    11,701,654    1,287,182     1,170,166        11,818,670

                                                 LIZA CHRISTINA GARMENT INDUSTRY, PT, Biaya atas
505   25-Jan-23    MANDIRI       1220011559559   Pemakaian Listrik di Unity Building periode Dec 2022           505,000       500,000       55,000         50,000           505,000
                                                 NUSA KIRANA REAL ESTATE, PT, Biaya Sewa
                                                 Penempatan Perangkat Telekomunikasi di Gedung
                                                 Kirana Boutique Berdasarkan Penggunaan Jaringan
506   25-Jan-23    MANDIRI       1220011559559   Internet periode Januari - Juni 2021                         25,434,889    25,183,059    2,770,136     2,518,306        25,434,889
                                                 PERHIMPUNAN PENGHUNI MENARA KADIN
                                                 INDONESIA, Biaya atas Pemakaian Listrik di Gedung
507   25-Jan-23    MANDIRI       1220011559559   Menara Kadin periode Dec 2022                                  350,541       389,489           -          38,948           350,541
                                                 PUALAM KENCANA GEMILANG JAKARTA, PT, Biaya
                                                 atas Pemakaian Listrik di Gedung Perwata Tower
508   25-Jan-23    MANDIRI       1220011559559   periode 26 Nov 2022 - 23 Dec 2022                              594,245       588,362       64,719         58,836           594,245
                                                 QUIROS NETWORKS, PT, Biaya Pemakaian Telepon
509   25-Jan-23    MANDIRI       1220011559559   Call Center Bulan Des 2022                                   12,247,440    11,033,730    1,213,710           -          12,247,440
                                                 SAINATH REALINDO, PT, Biaya atas Pemakaian Listrik
510   25-Jan-23    MANDIRI       1220011559559   di Gedung Sainath Tower periode Dec 2022                         77,322       85,913           -           8,591            77,322
                                                 TERAS NIRWANA BALI, PT, Biaya atas Pemakaian
                                                 Listrik di The CEO Building Periode 20 November
511   25-Jan-23    MANDIRI       1220011559559   2022 - 19 December 2022                                        131,199       129,900       14,289         12,990           131,199
Page 54
      TANGGAL
    PENGELUARAN                 NOMOR REKENING
       DI BANK  REKENING BANK     BANK YANG                                                            NILAI MUTASI                 NILAI YANG DIBAYARKAN
NO.  STATEMENT YANG DIGUNAKAN     DIGUNAKAN                NAMA VENDOR DAN KETERANGAN                     BANK         DPP          PPN             PPh       NET DIBAYARKAN
                                                 WAHANARIA CEMERLANG, PT, Biaya Listrik di Hotel
                                                 Ibis Styles Yogyakarta Lantai 6 site Sosromenduran
512   25-Jan-23    MANDIRI       1220011559559   002 periode December 2022                                 2,699,367    2,999,296         -         299,929         2,699,367
                                                 INTERNETINDO DATA CENTRA INDONESIA, PT, Sewa
                                                 Crossconnect 3D 6 UTP dan 3D 3 FO periode Des
513   25-Jan-23    MANDIRI       1220011559559   2022                                                      3,597,000    3,300,000    363,000         66,000         3,597,000
                                                 INTI ALGORITMA PERDANA, PT, Sewa Alat / kabel
                                                 Fiber Optic Pass Through PT Darya Varia Laboratoria
514   25-Jan-23    MANDIRI       1220011559559   periode Apr - Jun &Jul - Sept2022                        32,700,000   30,000,000   3,300,000       600,000        32,700,000
                                                 INTI ALGORITMA PERDANA, PT, Sewa Alat / kabel
                                                 Fiber Optic Pass Through PT Darya Varia Laboratoria
515   25-Jan-23    MANDIRI       1220011559559   periode Apr - Jun &Jul - Sept2022                        32,700,000   30,000,000   3,300,000       600,000        32,700,000
                                                 PERSADA BATAVIA MANDIRI, PT, Biaya Pengiriman
                                                 Material Cable dari PT Furukawa ke Ruko Green
516   25-Jan-23    MANDIRI       1220011559559   Mansion                                                    941,450      950,000      10,450         19,000           941,450
                                                 PPPSRSS SAHID SUDIRMAN CENTER, Tagihan
                                                 Revenue Sharing Bali Fiber di Sahid Sudirman Center
517   25-Jan-23    MANDIRI       1220011559559   periode Juli 2022 - September 2022                       59,232,190   58,645,733   6,451,030     5,864,573        59,232,190
                                                 SERPONG MAS TELEMATIKA, PT, Biaya Sewa Core FO
                                                 2 core HH Pos Polisi - German Center periode Nov
518   25-Jan-23    MANDIRI       1220011559559   2022                                                      1,635,000    1,635,000         -             -           1,635,000
                                                 TOWER BERSAMA, PT, Sewa Local Loop Metro E 100
                                                 Mbps Kawasan Nusa Dua Bali (Tower Bersama
519   25-Jan-23    MANDIRI       1220011559559   Group) periode 24 Des 2022 - 23 Jan 2023                  9,374,000    8,600,000    946,000        172,000         9,374,000
                                                 CYBER NETWORK INDONESIA, PT, Sewa Colocation
520   25-Jan-23    MANDIRI       1220011559559   Rack IU OTB (MMR) periode Jan 2023                        3,270,000    3,000,000    330,000         60,000         3,270,000
                                                 JALA LINTAS MEDIA, PT, Crossconnect Jala Lintas
                                                 Media Local Loop Cyber APJII to BSD Taman Tekno
521   25-Jan-23    MANDIRI       1220011559559   25 Mbps periode Des 2022                                  7,085,000    6,500,000    715,000        130,000         7,085,000
                                                 CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                 Material CCTV dari WH Serpong ke PT Kaliabang Jaya
                                                 Pratama, PT Morasha Inti Shabrina & PT Media Solusi
522   25-Jan-23    MANDIRI       1220011559559   Network,                                                  1,238,750    1,250,000     13,750         25,000         1,238,750
                                                 CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                 Material CCTV dari WH Serpong ke PT Kaliabang Jaya
                                                 Pratama, PT Morasha Inti Shabrina & PT Media Solusi
523   25-Jan-23    MANDIRI       1220011559559   Network,                                                   495,500      500,000       5,500         10,000           495,500
                                                 CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                 Material CCTV dari WH Serpong ke PT Kaliabang Jaya
                                                 Pratama, PT Morasha Inti Shabrina & PT Media Solusi
524   25-Jan-23    MANDIRI       1220011559559   Network,                                                   594,600      600,000       6,600         12,000           594,600
                                                 CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                 Material CCTV dari WH Serpong ke PT Kaliabang Jaya
                                                 Pratama, PT Morasha Inti Shabrina & PT Media Solusi
525   25-Jan-23    MANDIRI       1220011559559   Network,                                                   594,600      600,000       6,600         12,000           594,600
                                                 CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                 Material CCTV dari WH Serpong ke PT Kaliabang Jaya
                                                 Pratama, PT Morasha Inti Shabrina & PT Media Solusi
526   25-Jan-23    MANDIRI       1220011559559   Network,                                                   495,500      500,000       5,500         10,000           495,500
                                                 CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                 Material CCTV dari WH Serpong ke PT Kaliabang Jaya
                                                 Pratama, PT Morasha Inti Shabrina & PT Media Solusi
527   25-Jan-23    MANDIRI       1220011559559   Network,                                                   495,500      500,000       5,500         10,000           495,500
                                                 CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                 Material CCTV dari WH Serpong ke PT Kaliabang Jaya
                                                 Pratama, PT Morasha Inti Shabrina & PT Media Solusi
528   25-Jan-23    MANDIRI       1220011559559   Network,                                                   495,500      500,000       5,500         10,000           495,500
                                                 CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                 Material CCTV dari WH Serpong ke PT Kaliabang Jaya
                                                 Pratama, PT Morasha Inti Shabrina & PT Media Solusi
529   25-Jan-23    MANDIRI       1220011559559   Network,                                                   495,500      500,000       5,500         10,000           495,500
                                                 CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                 Material CCTV dari WH Serpong ke PT Kaliabang Jaya
                                                 Pratama, PT Morasha Inti Shabrina & PT Media Solusi
530   25-Jan-23    MANDIRI       1220011559559   Network,                                                   991,000     1,000,000     11,000         20,000           991,000
                                                 CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                 Material CCTV dari WH Serpong ke PT Kaliabang Jaya
                                                 Pratama, PT Morasha Inti Shabrina & PT Media Solusi
531   25-Jan-23    MANDIRI       1220011559559   Network,                                                   495,500      500,000       5,500         10,000           495,500
                                                 CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                 Material CCTV dari WH Serpong ke PT Kaliabang Jaya
                                                 Pratama, PT Morasha Inti Shabrina & PT Media Solusi
532   25-Jan-23    MANDIRI       1220011559559   Network,                                                   495,500      500,000       5,500         10,000           495,500
                                                 CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                 Material CCTV dari WH Serpong ke PT Kaliabang Jaya
                                                 Pratama, PT Morasha Inti Shabrina & PT Media Solusi
533   25-Jan-23    MANDIRI       1220011559559   Network,                                                   495,500      500,000       5,500         10,000           495,500
                                                 CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                 Material CCTV dari WH Serpong ke PT Kaliabang Jaya
                                                 Pratama, PT Morasha Inti Shabrina & PT Media Solusi
534   25-Jan-23    MANDIRI       1220011559559   Network,                                                   495,500      500,000       5,500         10,000           495,500
                                                 CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                 Material CCTV dari WH Serpong ke PT Kaliabang Jaya
                                                 Pratama, PT Morasha Inti Shabrina & PT Media Solusi
535   25-Jan-23    MANDIRI       1220011559559   Network,                                                   495,500      500,000       5,500         10,000           495,500
                                                 CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                 Material CCTV dari WH Serpong ke PT Kaliabang Jaya
                                                 Pratama, PT Morasha Inti Shabrina & PT Media Solusi
536   25-Jan-23    MANDIRI       1220011559559   Network,                                                  4,310,850    4,350,000     47,850         87,000         4,310,850
                                                 CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                 Material CCTV dari WH Serpong ke PT Kaliabang Jaya
                                                 Pratama, PT Morasha Inti Shabrina & PT Media Solusi
537   25-Jan-23    MANDIRI       1220011559559   Network,                                                  2,477,500    2,500,000     27,500         50,000         2,477,500
Page 55
      TANGGAL
    PENGELUARAN                 NOMOR REKENING
       DI BANK  REKENING BANK     BANK YANG                                                              NILAI MUTASI                   NILAI YANG DIBAYARKAN
NO.  STATEMENT YANG DIGUNAKAN     DIGUNAKAN              NAMA VENDOR DAN KETERANGAN                         BANK          DPP           PPN             PPh       NET DIBAYARKAN
                                                 CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                 Material CCTV dari WH Serpong ke PT Kaliabang Jaya
                                                 Pratama, PT Morasha Inti Shabrina & PT Media Solusi
538   25-Jan-23    MANDIRI       1220011559559   Network,                                                    2,477,500     2,500,000      27,500         50,000         2,477,500
                                                 CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                 Material CCTV dari WH Serpong ke PT Kaliabang Jaya
                                                 Pratama, PT Morasha Inti Shabrina & PT Media Solusi
539   25-Jan-23    MANDIRI       1220011559559   Network,                                                     792,800       800,000        8,800         16,000           792,800
                                                 CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                 Material CCTV dari WH Serpong ke PT Kaliabang Jaya
                                                 Pratama, PT Morasha Inti Shabrina & PT Media Solusi
540   25-Jan-23    MANDIRI       1220011559559   Network,                                                     495,500       500,000        5,500         10,000           495,500

                                                 DITJEN POSTEL, BHP Frekuensi Radio Periode 26 Feb
541   26-Jan-23    MANDIRI       1220011559559   2023 s.d 25 Feb 2024 - No. Aplikasi : 00026022014          59,954,436    59,954,436          -             -          59,954,436

                                                 ENLIG MANDIRI SEJAHTERA, PT, Reimbursement
542   26-Jan-23     BCA           3193058058     Insentif Outsource Div. Direct Sales Periode Okt 2022        908,717       902,699        7,355          1,337           908,717
                                                 P3SRS SEMENTARA MEGA GLODOK KEMAYORAN,
543   26-Jan-23    MANDIRI       1220011559559   Biaya atas Pemakaian Listrik di MGK Kemayoran                143,838       143,838           -             -             143,838
                                                 P3SRS SEMENTARA MEGA GLODOK KEMAYORAN,
544   26-Jan-23    MANDIRI       1220011559559   Biaya atas Pemakaian Listrik di MGK Kemayoran                139,339       139,339           -             -             139,339
                                                 PERMATA INDO SEJAHTERA, PT, Reimbursement
545   26-Jan-23    MANDIRI       1220011559559   Insentif Outsource Div. Direct Sales                       41,332,911    41,059,183     334,557         60,829        41,332,911
                                                 PERMATA INDO SEJAHTERA, PT, Reimbursement
546   26-Jan-23    MANDIRI       1220011559559   Insentif Outsource Div. Direct Sales                       95,134,765    94,504,733     770,039        140,007        95,134,765
                                                 RAJAWALI ADIWISMA, PT, Biaya atas Pemakaian
547   26-Jan-23    MANDIRI       1220011559559   Listrik di Menara Rajawali Periode Dec 2022                  184,197       182,373       20,061         18,237           184,197

                                                 INDONESIA COMNETS PLUS, PT, Sewa Crossconnect
                                                 5 Mbps CCTV Purwakarta - Pertigaan Wanayasa,
548   26-Jan-23    MANDIRI       1220011559559   Pertigaan Cianting, Situ Wanayasa periode Sept 2022         6,540,000     6,540,000          -             -           6,540,000
                                                 LINK NET TBK, PT, Link Net IDC Duren Tiga (3D) to
                                                 Omadata Intiland Surabaya Tower LT.3 B00573-014
549   26-Jan-23     BCA           3193058058     2Gbps periode Des 2022                                     30,520,000    28,000,000    3,080,000       560,000        30,520,000
                                                 NTT INDONESIA, PT, Biaya Cross-Connect Rack S2
                                                 APJII Lantai 1 ke NTT Lantai 3A (Interkoneksi
550   26-Jan-23     BCA           3193058058     Facebook) periode Des 2022                                 10,900,000    10,000,000    1,100,000       200,000        10,900,000
                                                 PERHIMPUNAN PEMILIK DAN PENGHUNI SATUAN
                                                 RUMAH SUSUN HUNIAN DAN NON HUNIAN MAL &
                                                 KONDOMINIUM TAMAN ANGGREK, Biaya Sewa
                                                 Penempatan Perangkat Telekomunikasi di Mall &
                                                 Kondominium Taman Anggrek Berdasarkan Profit
551   26-Jan-23     BCA           3193058058     Sharing Periode Desember 2022                              13,602,929    15,114,366          -       1,511,437        13,602,929
                                                 SUKA DUKA GIRI HILL, Biaya Management Fee atas
                                                 Revenue Sharing periode November 2022 di Suka
552   26-Jan-23    MANDIRI       1220011559559   Duka Raya Kampial - Perumahan Giri Hill                     2,283,885     2,379,047         -           95,162         2,283,885
553   26-Jan-23     BCA           3193058058     POWER TELECOM, PT, Biaya Sewa Dark Fiber 4core              1,732,010     1,589,000     174,790         31,780         1,732,010
554   26-Jan-23     BCA           3193058058     POWER TELECOM, PT, Biaya Sewa Dark Fiber 4core              9,679,200     8,880,000     976,800        177,600         9,679,200
555   26-Jan-23     BCA           3193058058     POWER TELECOM, PT, Biaya Sewa Dark Fiber 4core              1,036,154       950,600     104,566         19,012         1,036,154
556   26-Jan-23     BCA           3193058058     POWER TELECOM, PT, Biaya Sewa Dark Fiber 4core              3,714,284     3,407,600     374,836         68,152         3,714,284
                                                 BIBIT, Mr, Biaya Pekerjaan Perbaikan FO Cut Link
                                                 Sukawati-002 to Abianbase-001 (TT H1212-023) Jl
557   26-Jan-23   SINARMAS        0002999994     Blahbatu Gianyar - Bali                                     2,090,956     2,155,625          -          64,669         2,090,956
                                                 BIBIT, Mr, Biaya Pekerjaan Perbaikan FO Cut (TT
                                                 H1209-003) FO Link Sukawati_002 - to
558   26-Jan-23   SINARMAS        0002999994     Abianbase_001 GNY_04 Jln Raya Sukawati                      2,788,023     2,874,250          -          86,228         2,788,023
                                                 MORA TELEMATIKA INDONESIA, PT, Sewa Dark Core
559   27-Jan-23    MANDIRI       1220011559559   MTI Asia Retail                                            74,964,750    68,775,000    7,565,250     1,375,500        74,964,750
                                                 MORA TELEMATIKA INDONESIA, PT, Sewa Dark Core
560   27-Jan-23    MANDIRI       1220011559559   MTI Asia Retail                                            74,964,750    68,775,000    7,565,250     1,375,500        74,964,750
                                                 MORA TELEMATIKA INDONESIA, PT, Sewa Dark Core
561   27-Jan-23    MANDIRI       1220011559559   MTI Asia Retail                                            74,964,750    68,775,000    7,565,250     1,375,500        74,964,750
                                                 PENGEMBANGAN PARIWISATA INDONESIA, PT,
                                                 Tagihan Kompensasi atas Pemasangan Kabel Fiber
                                                 dan Monopole Triwulan I/2023 Periode Jan-Mar
562   30-Jan-23   SINARMAS        0000670707     2023                                                      548,567,670   609,519,634          -      60,951,963       548,567,670
                                                 PENGEMBANGAN PARIWISATA INDONESIA, PT,
                                                 Tagihan Kompensasi atas Pemasangan Kabel Fiber
                                                 dan Monopole Triwulan I/2023 Periode Jan-Mar
563   30-Jan-23    MANDIRI       1220011559559   2023 - PPN                                                  8,512,139           -      8,512,139           -           8,512,139
                                                 PENGEMBANGAN PARIWISATA INDONESIA, PT,
                                                 Tagihan Kompensasi atas Pemasangan Kabel Fiber
                                                 dan Monopole Triwulan I/2023 Periode Jan-Mar
564   30-Jan-23    MANDIRI       1220011559559   2023 - PPN                                                 61,613,168           -     61,613,168           -          61,613,168
                                                 JEJARING ULTRA PRIMA, PT, Biaya Sewa Penempatan
                                                 Perangkat Telekomunikasi di Kawasan Summarecon
                                                 Residential Berdasarkan Profit Sharing April 2022 -
565   31-Jan-23    MANDIRI       1220011559559   Juni 2022                                                 142,453,282   141,042,853   15,514,714    14,104,285       142,453,282
                                                 JEJARING ULTRA PRIMA, PT, Biaya Sewa Penempatan
                                                 Perangkat Telekomunikasi di Kawasan Summarecon
                                                 Residential Berdasarkan Profit Sharing April 2022 -
566   31-Jan-23    MANDIRI       1220011559559   Juni 2022                                                  98,512,596    97,537,223   10,729,095     9,753,722        98,512,596
                                                 MEKAR PRANA INDAH, PT, Biaya atas Pemakaian
567   31-Jan-23    MANDIRI       1220011559559   Listrik di Menara Bidakara 2 periode Dec 2022                271,298       268,612       29,547         26,861           271,298
                                                 INDOSAT TBK, PT, Biaya Sewa Domestic Ethernet Link
                                                 (MPLS) MSC Gatsu Denpasar Bali to KPPTI Lt. 6
568   31-Jan-23    MANDIRI       1220011559559   Jakarta periode Des 2022                                  114,450,000   105,000,000   11,550,000     2,100,000       114,450,000
                                                 PERHIMPUNAN PEMILIK DAN PENGHUNI SATUAN
                                                 RUMAH SUSUN KOMERSIAL CAMPURAN
                                                 SEMENTARA APARTEMENT SATU8 RESIDENCE,
                                                 Tagihan Revenue Sharing Bali Fiber di Apartement
569   31-Jan-23    MANDIRI       1220011559559   Satu8 Periode Juli - September 2022                         1,907,987     1,946,925          -          38,938         1,907,987
Page 56
      TANGGAL
    PENGELUARAN                 NOMOR REKENING
       DI BANK  REKENING BANK     BANK YANG                                                              NILAI MUTASI                   NILAI YANG DIBAYARKAN
NO.  STATEMENT YANG DIGUNAKAN     DIGUNAKAN              NAMA VENDOR DAN KETERANGAN                         BANK          DPP           PPN             PPh       NET DIBAYARKAN

                                                 SERPONG MAS TELEMATIKA, PT, Biaya Management
                                                 Fee atas Revenue Sharing Residential periode
570   31-Jan-23    MANDIRI       1220011559559   November 2022 di Kawasan Bumi Serpong Damai                 1,595,063     1,463,360     160,970         29,267         1,595,063
                                                 TEKNOVATUS SOLUSI SEJAHTERA, PT, Sewa
                                                 Colocation Rack & MMR Connect untuk Tenant PT
                                                 Wirecard Technologies Indonesia periode 01 - 30 Nov
571   31-Jan-23    MANDIRI       1220011559559   2022                                                         635,834       583,333       64,167         11,666           635,834
                                                 TEKNOVATUS SOLUSI SEJAHTERA, PT, Sewa
                                                 Colocation Rack & MMR Connect untuk Tenant PT
                                                 Wirecard Technologies Indonesia periode 01 - 30 Nov
572   31-Jan-23    MANDIRI       1220011559559   2022                                                         635,834       583,333       64,167         11,666           635,834
                                                 TEKNOVATUS SOLUSI SEJAHTERA, PT, Sewa
                                                 Colocation Rack & MMR Connect untuk Tenant PT
                                                 Wirecard Technologies Indonesia periode 01 - 30 Nov
573   31-Jan-23    MANDIRI       1220011559559   2022                                                        6,022,250     5,525,000     607,750        110,500         6,022,250
                                                 TEKNOVATUS SOLUSI SEJAHTERA, PT, Tagihan Sewa
                                                 Collocation Rack 47 U 19" periode Des 2022 dan
574   31-Jan-23    MANDIRI       1220011559559   Kelebihan Pemakaian Listrik periode Nov 2022               28,183,233    25,390,300    2,792,933           -          28,183,233
                                                 TEKNOVATUS SOLUSI SEJAHTERA, PT, Sewa
                                                 Colocation Rack & MMR Connect untuk Tenant PT
                                                 Wirecard Technologies Indonesia periode 01 - 31 Des
575   31-Jan-23    MANDIRI       1220011559559   2022                                                        6,022,250     5,525,000     607,750        110,500         6,022,250

                                                 ZENZIVA ZETTA INDONESIA, PT, Uang Muka Beban
                                                 Umum atas Topup SMS Credit utk Info & Reminder
576   31-Jan-23    MANDIRI       1220011559559   Tagihan pelanggan FTTX 24 Jan s/d 24 Mei 2023 - Trf         4,469,000     4,469,000          -             -           4,469,000
                                                 JALA LINTAS MEDIA, PT, Sewa Local Loop 10 Mbps &
                                                 20 Mbps Tenant Citeureup dan Gunung Putri (VLAN)
577   31-Jan-23    MANDIRI       1220011559559   periode Des 2022                                            9,265,000     8,500,000     935,000        170,000         9,265,000
                                                 LINK NET TBK, PT, Link Net IDC D3 Jakarta to NIX Bali
578   01-Feb-23     BCA           3193058058     B00573-009 10Gbps periode Des 2022                        201,650,000   185,000,000   20,350,000     3,700,000       201,650,000
579   01-Feb-23     BCA           3193058058     POWER TELECOM, PT, Biaya sewa dark fiber core               6,356,880     5,832,000      641,520       116,640         6,356,880
580   01-Feb-23     BCA           3193058058     POWER TELECOM, PT, Biaya sewa dark fiber core              20,339,400    18,660,000    2,052,600       373,200        20,339,400
581   01-Feb-23     BCA           3193058058     POWER TELECOM, PT, Biaya sewa dark fiber core              10,203,981     9,361,450    1,029,760       187,229        10,203,981
                                                 PLN PERSERO, PT, Biaya pembelian token pulsa
582   02-Feb-23   SINARMAS        00002999994    prabayar di 7 site pemakaian bulan Februari 2023           11,032,500    11,032,500          -             -          11,032,500
                                                 PPRS KEBON KACANG, Sewa Penempatan Perangkat
                                                 di Rusun Kebon Kacang periode 01 Okt 2022 - 30
583   02-Feb-23    MANDIRI       1220011559559   Sept 2023                                                   6,750,000     7,500,000          -         750,000         6,750,000
                                                 NOKIA SOLUTIONS and NETWORK INDONESIA, PT,
                                                 Jasa Maintenance OLT FX-4 Period Q1 24 Okt 2022 -
584   02-Feb-23    MANDIRI       1220011559559   23 Jan 2023                                               308,079,544   282,641,783   31,090,596     5,652,835       308,079,544
                                                 BINTANG SEMPURNA, PT, Pembelian Flyer
                                                 November Pamer Inet Only Sebanyak 5.000 Pcs,
585   03-Feb-23    MANDIRI       1220011559559   Pembelian Wall Sticker CBD Pluit Sebanyak 1 Set              991,573       909,700      100,067         18,194           991,573
                                                 BINTANG SEMPURNA, PT, Pembelian Flyer
                                                 November Pamer Inet Only Sebanyak 5.000 Pcs,
586   03-Feb-23    MANDIRI       1220011559559   Pembelian Wall Sticker CBD Pluit Sebanyak 1 Set             2,519,862     2,311,800     254,298         46,236         2,519,862
                                                 BINTANG SEMPURNA, PT, Pembelian Flyer
                                                 November Pamer Inet Only Sebanyak 5.000 Pcs,
587   03-Feb-23    MANDIRI       1220011559559   Pembelian Wall Sticker CBD Pluit Sebanyak 1 Set             1,362,500     1,250,000     137,500         25,000         1,362,500
                                                 BINTANG SEMPURNA, PT, Pembelian Flyer
                                                 November Pamer Inet Only Sebanyak 5.000 Pcs,
588   03-Feb-23    MANDIRI       1220011559559   Pembelian Wall Sticker CBD Pluit Sebanyak 1 Set                65,400       60,000        6,600          1,200            65,400
                                                 BINTANG SEMPURNA, PT, Pembelian Flyer
                                                 November Pamer Inet Only Sebanyak 5.000 Pcs,
589   03-Feb-23    MANDIRI       1220011559559   Pembelian Wall Sticker CBD Pluit Sebanyak 1 Set             5,995,000     5,500,000     605,000        110,000         5,995,000
                                                 BUMI MULIA PERKASA DEVELOPMENT, PT, Sewa
                                                 Penempatan Perangkat di Gedung Atrium Mulia
590   03-Feb-23    MANDIRI       1220011559559   periode 01 Feb 2023 - 31 Jan 2024                          60,600,000    60,000,000    6,600,000     6,000,000        60,600,000
                                                 CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                 Material OTB Outdoor 24 Core, Cable Network dari
591   03-Feb-23    MANDIRI       1220011559559   WH Serpong ke WH Bali                                       5,995,550     6,050,000      66,550        121,000         5,995,550
                                                 CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                 Material OTB Outdoor 24 Core, Cable Network dari
592   03-Feb-23    MANDIRI       1220011559559   WH Serpong ke WH Bali                                       1,238,750     1,250,000      13,750         25,000         1,238,750
                                                 CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                 Material OTB Outdoor 24 Core, Cable Network dari
593   03-Feb-23    MANDIRI       1220011559559   WH Serpong ke WH Bali                                        743,250       750,000        8,250         15,000           743,250
                                                 CYBER NETWORK INDONESIA, PT, Biaya Sewa
594   03-Feb-23    MANDIRI       1220011559559   Collocation OTB Nix Bali periode Jan 2023                   2,997,500     2,750,000     302,500         55,000         2,997,500
                                                 TECHNOLOGY DATA INDONESIA, PT, Biaya Sewa Rack
                                                 Summer 243 IDC Duren Tiga (Colocation 1/2 Rack)
595   03-Feb-23    MANDIRI       1220011559559   Periode 1 s/d 30 Nov 2022                                   7,630,000     7,000,000     770,000        140,000         7,630,000
                                                 TECHNOLOGY DATA INDONESIA, PT, Biaya Sewa Rack
                                                 Summer 243 IDC Duren Tiga (Colocation 1/2 Rack)
596   03-Feb-23    MANDIRI       1220011559559   Periode 1 s/d 30 Nov 2022                                   7,630,000     7,000,000     770,000        140,000         7,630,000
                                                 TECHNOLOGY DATA INDONESIA, PT, Tagihan
                                                 Reimbursement Listrik Rack No. Summer 243
597   03-Feb-23    MANDIRI       1220011559559   Periode Nov 2022                                             763,000       700,000       77,000         14,000           763,000
                                                 TIRTA INDORAYA LOGISTICS, PT, Biaya Pengiriman
                                                 Material Cable Optical Drop SM 1 Core dari PT
598   03-Feb-23    MANDIRI       1220011559559   Furukawa ke WH Serpong                                      2,398,000     2,200,000     242,000         44,000         2,398,000

                                                 VIFA INDO SUKSES, PT, Pembelian Bracket Dead End
                                                 Noise D 50-70 MM 48 Core untuk Kebutuhan Stock
599   03-Feb-23    MANDIRI       1220011559559   Tower Operation Q4 Batch 02 2022 Sebanyak 30 Set            1,132,200     1,020,000     112,200            -           1,132,200

                                                 IPROAD INTERNASIONAL INDONESIA, PT, Jasa Service
600   03-Feb-23    MANDIRI       1220011559559   ONT Alcatel Lucent G-241W-A sebanyak 10 Unit                 763,000       700,000       77,000         14,000           763,000
                                                 SUBURMITRA GRAFISTAMA, PT, Pembelian Biaya
                                                 Flyer Promo Akhir Tahun Desember periode
601   03-Feb-23    MANDIRI       1220011559559   November 2022                                              14,922,100    13,690,000    1,505,900       273,800        14,922,100
Page 57
      TANGGAL
    PENGELUARAN                 NOMOR REKENING
       DI BANK  REKENING BANK     BANK YANG                                                              NILAI MUTASI                 NILAI YANG DIBAYARKAN
NO.  STATEMENT YANG DIGUNAKAN     DIGUNAKAN               NAMA VENDOR DAN KETERANGAN                        BANK         DPP          PPN             PPh       NET DIBAYARKAN
                                                 SANTA MULTI SEMESTA, PT, Tagihan 100% atas
                                                 Pekerjaan Penarikan FO Cut Impact Hit by Truck Site
602   03-Feb-23    MANDIRI       1220011559559   MP-Tambora-001                                              3,034,182    2,835,684    311,925        113,427         3,034,182
                                                 SANTA MULTI SEMESTA, PT, Tagihan 100% atas
                                                 Pekerjaan Penarikan FO Cut Impact Kabel Eksisting
603   03-Feb-23    MANDIRI       1220011559559   Hanyut Terbawa Banjir Site Pasir Putih-005                  1,935,292    1,808,684    198,955         72,347         1,935,292
                                                 SANTA MULTI SEMESTA, PT, Tagihan 100% atas
                                                 Pekerjaan Penarikan Kabel FO Cut Impact Kabel FO
604   03-Feb-23    MANDIRI       1220011559559   Landai Corp PT Nico Central                                 2,609,392    2,438,684    268,255         97,547         2,609,392
                                                 BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
605   03-Feb-23    MANDIRI       1220011559559   FO Cut site Rawa Buaya-002                                  1,638,144    1,680,147         -          42,003         1,638,144

                                                 BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
                                                 Penarikan Kabel FO Cut Impact tertabrak Truck
606   03-Feb-23    MANDIRI       1220011559559   Dishub Jl. Hayam Wuruk - Jl. Sawah Besar (Ketapang)         1,678,314    1,721,347         -          43,033         1,678,314
                                                 NTT INDONESIA, PT, Sewa NTT Fiber Connect (XC
607   06-Feb-23     BCA           3193058058     Inter DC Akamai - APJII) periode Des 2022                   7,085,000    6,500,000    715,000        130,000         7,085,000
                                                 POWER TELECOM, PT, Biaya Sewa Dark Fiber Section
                                                 25 3.965KM Pasirjaya-001 - Paledang-001 periode
608   06-Feb-23     BCA           3193058058     Jan 2023                                                    3,025,295    2,775,500    305,305         55,510         3,025,295
                                                 PLN PERSERO, PT, Biaya Swap KWH PLN Site 22
609   07-Feb-23    MANDIRI       1220011559559   Lambing SST 50 - Project Bali                                605,989      605,989          -             -             605,989

610   07-Feb-23    MANDIRI       1220011559559   PLN PERSERO, PT, Biaya pengisian token KWH Listrik           103,500      103,500          -             -             103,500

611   07-Feb-23    MANDIRI       1220011559559   PLN PERSERO, PT, Biaya pengisian token KWH Listrik           500,000      500,000          -             -             500,000

612   07-Feb-23    MANDIRI       1220011559559   PLN PERSERO, PT, Biaya pengisian token KWH Listrik           500,000      500,000          -             -             500,000

613   07-Feb-23    MANDIRI       1220011559559   PLN PERSERO, PT, Biaya pengisian token KWH Listrik             20,000      20,000          -             -              20,000

614   07-Feb-23    MANDIRI       1220011559559   PLN PERSERO, PT, Biaya pengisian token KWH Listrik           103,500      103,500          -             -             103,500
                                                 TELEKOMUNIKASI SELULAR, PT, Biaya pengisian top
                                                 up Paket Data Mikrotik site MP-Daeng Mohamad
615   07-Feb-23    MANDIRI       1220011559559   Ardiwinata West Java Periode Januari 2023                    124,000      124,000          -             -             124,000

                                                 XL AXIATA TBK, PT, Biaya Pengisian Top up Paket
                                                 Data Mikrotik site Tawangsari-008 Tenant Smartfren
616   07-Feb-23    MANDIRI       1220011559559   Periode Januari 2023 Region Jawa Tengah                        61,500      61,500          -             -              61,500
                                                 TOWER OPERATION, Uang Muka Beban Umum atas
                                                 FPU Biaya Pembelian Token Urgent 1 Site 702751
                                                 Pegadungan-027 (Site Tidak Terproposed di Phase 01
617   07-Feb-23    MANDIRI       1220011559559   (2023)) - Trf                                               3,010,500    3,010,500         -             -           3,010,500
                                                 DAIDAN UTAMA PIALANG ASURANSI, PT, Biaya
                                                 Premi Asuransi General Liability Tower Micro Pole
618   08-Feb-23    MANDIRI       1220011559559   sebanyak 276 site Penambahan 3 Site                          257,771      257,771          -             -             257,771
                                                 BENTENG ANUGERAH ASIH, PT, Biaya Pengiriman
                                                 Material Switch, SFP, CCTV dari WH Serpong ke WH
619   08-Feb-23    MANDIRI       1220011559559   Bali                                                       13,081,200   13,200,000    145,200        264,000        13,081,200
                                                 BENTENG ANUGERAH ASIH, PT, Biaya Pengiriman
                                                 Material Switch, SFP, CCTV dari WH Serpong ke WH
620   08-Feb-23    MANDIRI       1220011559559   Bali                                                        2,229,750    2,250,000     24,750         45,000         2,229,750
                                                 BENTENG ANUGERAH ASIH, PT, Biaya Pengiriman
                                                 Material Switch, SFP, CCTV dari WH Serpong ke WH
621   08-Feb-23    MANDIRI       1220011559559   Bali                                                       12,040,650   12,150,000    133,650        243,000        12,040,650
                                                 BENTENG ANUGERAH ASIH, PT, Biaya Pengiriman
                                                 Material Switch, SFP, CCTV dari WH Serpong ke WH
622   08-Feb-23    MANDIRI       1220011559559   Bali                                                       16,747,900   16,900,000    185,900        338,000        16,747,900
                                                 BENTENG ANUGERAH ASIH, PT, Biaya Pengiriman
                                                 Material Return JW & JSC dari PT Immobi Solusi
623   08-Feb-23    MANDIRI       1220011559559   Prima ke WH Serpong                                         5,252,300    5,300,000     58,300        106,000         5,252,300
                                                 BENTENG ANUGERAH ASIH, PT, Biaya Pengiriman
                                                 Material Return JW & JSC dari PT Immobi Solusi
624   08-Feb-23    MANDIRI       1220011559559   Prima ke WH Serpong                                        16,847,000   17,000,000    187,000        340,000        16,847,000
                                                 BENTENG ANUGERAH ASIH, PT, Biaya Pengiriman
                                                 Material Return JW & JSC dari PT Immobi Solusi
625   08-Feb-23    MANDIRI       1220011559559   Prima ke WH Serpong                                         9,364,950    9,450,000    103,950        189,000         9,364,950
                                                 BENTENG ANUGERAH ASIH, PT, Biaya Pengiriman
                                                 Material Return JW & JSC dari PT Immobi Solusi
626   08-Feb-23    MANDIRI       1220011559559   Prima ke WH Serpong                                         6,788,350    6,850,000     75,350        137,000         6,788,350
                                                 BUMI MULIA PERKASA DEVELOPMENT, PT, Biaya atas
                                                 Pemakaian Listrik di Gedung Atrium Mulia periode
627   08-Feb-23    MANDIRI       1220011559559   Jan 2023                                                     232,423      230,122      25,313         23,012           232,423
                                                 GRIYA MURIA KENCANA, PT, Biaya atas Pemakaian
                                                 Listrik di Gedung Prince Center periode 27 Dec 2022 -
628   08-Feb-23    MANDIRI       1220011559559   25 Jan 2023                                                  227,543      225,290      24,782         22,529           227,543
                                                 INTERNETINDO DATA CENTRA INDONESIA, PT,
                                                 Tagihan Kelebihan Pemakaian Listrik Rack No Winter
629   08-Feb-23    MANDIRI       1220011559559   233 Per 1 - 31 Des 2022 (IDC Indonesia)                    10,682,000    9,800,000   1,078,000       196,000        10,682,000
                                                 INTERNETINDO DATA CENTRA INDONESIA, PT,
                                                 Tagihan Kelebihan Pemakaian Listrik Rack No Winter
630   08-Feb-23    MANDIRI       1220011559559   233 Per 1 - 31 Des 2022 (IDC Indonesia)                     2,943,000    2,700,000    297,000         54,000         2,943,000
                                                 INTERNETINDO DATA CENTRA INDONESIA, PT,
                                                 Tagihan Kelebihan Pemakaian Listrik Rack No Winter
631   08-Feb-23    MANDIRI       1220011559559   233 Per 1 - 31 Des 2022 (IDC Indonesia)                     2,180,000    2,000,000    220,000         40,000         2,180,000
                                                 MOXCAL TEKNOLOGI, PT, Tagihan Sewa Modul
                                                 Aplikasi Call Center Centerix periode Jan 2023
632   08-Feb-23    MANDIRI       1220011559559   (Additional 10qty)                                         10,900,000   10,000,000   1,100,000       200,000        10,900,000
                                                 MOXCAL TEKNOLOGI, PT, Tagihan Sewa Modul
                                                 Aplikasi Call Center Centerix periode Jan 2023
633   08-Feb-23    MANDIRI       1220011559559   (Additional 10qty)                                         10,900,000   10,000,000   1,100,000       200,000        10,900,000
                                                 MOXCAL TEKNOLOGI, PT, Tagihan Sewa Modul
                                                 Aplikasi Call Center Centerix periode Jan 2023
634   08-Feb-23    MANDIRI       1220011559559   (Additional 10qty)                                           654,000      600,000      66,000         12,000           654,000
Page 58
      TANGGAL
    PENGELUARAN                 NOMOR REKENING
       DI BANK  REKENING BANK     BANK YANG                                                              NILAI MUTASI                   NILAI YANG DIBAYARKAN
NO.  STATEMENT YANG DIGUNAKAN     DIGUNAKAN                NAMA VENDOR DAN KETERANGAN                       BANK          DPP           PPN             PPh       NET DIBAYARKAN
                                                 MOXCAL TEKNOLOGI, PT, Tagihan Sewa Modul
                                                 Aplikasi Call Center Centerix periode Jan 2023
635   08-Feb-23    MANDIRI       1220011559559   (Additional 10qty)                                          5,450,000     5,000,000     550,000        100,000         5,450,000
                                                 MOXCAL TEKNOLOGI, PT, Tagihan Sewa Modul
                                                 Aplikasi Call Center Centerix periode Jan 2023
636   08-Feb-23    MANDIRI       1220011559559   (Additional 10qty)                                         10,900,000    10,000,000    1,100,000       200,000        10,900,000
                                                 PERHIMPUNAN PENGHUNI KONDOMINIUM
                                                 PERKANTORAN GRAHA SURVEYOR INDONESIA,
637   08-Feb-23    MANDIRI       1220011559559   Pemakaian Listrik di Gedung Surveyor                         336,580       373,977           -          37,397           336,580
                                                 PERHIMPUNAN PENGHUNI KONDOMINIUM
                                                 PERKANTORAN GRAHA SURVEYOR INDONESIA,
638   08-Feb-23    MANDIRI       1220011559559   Pemakaian Listrik di Gedung Surveyor                         343,434       381,593           -          38,159           343,434
                                                 PPPSRS CBD PLUIT, Biaya atas Pemakaian Listrik CBD
639   08-Feb-23    MANDIRI       1220011559559   Pluit periode Januari 2023                                   316,296       316,296           -             -             316,296
                                                 SARANA UTAMA ADIMANDIRI, PT, Sewa Penempatan
                                                 Perangkat si Gedung Plaza SUA periode 03 Des 2022 -
640   08-Feb-23    MANDIRI       1220011559559   02 Des 2023                                                12,120,000    12,000,000    1,320,000     1,200,000        12,120,000
                                                 THE CLOVER TOWER, Sewa Penempatan Perangkat si
                                                 Gedung The Clover periode 15 Feb 2023 - 14 Feb
641   08-Feb-23    MANDIRI       1220011559559   2024                                                       12,000,000    13,333,333          -       1,333,333        12,000,000
                                                 AP FIELD OPERATION & OPTIMIZING, Biaya
                                                 Kompensasi Listri Warga Project Jakwifi Batch 1 ( 809
                                                 Pole - 812 Penerima Kompensasi ) Periode 11 ,
642   08-Feb-23   SINARMAS        0000240408     Februari - Mei 2023 - Trf                                 444,150,000   444,150,000          -             -         444,150,000
                                                 KALIABANG JAYA PRATAMA, PT, Tagihan 100% atas
                                                 Pekerjaan Geser Tiang BB Protect SRBY 03 to Kantor
643   08-Feb-23    MANDIRI       1220011559559   Pucang Cluster Darmo RW05                                    732,787       676,315       74,394         17,922           732,787
                                                 BALI PECATU GRAHA, PT, Biaya pembayaran tagihan
                                                 listrik dan IPL BPG bulan Februari 2023(pemakaian
644   09-Feb-23   SINARMAS        00002999994    bulan Januari 2023)                                        12,968,680    12,968,680          -             -          12,968,680
                                                 ASSET PACIFIC, PT, Biaya atas Pemakaian Listrik di
645   09-Feb-23    MANDIRI       1220011559559   Gedung Menara Salemba periode Dec 2022                       121,338       120,136       13,215         12,013           121,338
                                                 DANAMAS INSAN KREASI ANDALAN, PT,
                                                 Reimbursement Salary Outsource Div. Direct Sales
646   09-Feb-23    MANDIRI       1220011559559   Periode Des 2022 dan Insentif Periode Nov 2022             68,283,344    67,831,137     552,698        100,491        68,283,344
                                                 DATAMEDIA MAKMUR PRATAMA, PT, Biaya Layanan
                                                 Content TV 42 Channel untuk Tenant RS Atma Jaya
647   09-Feb-23    MANDIRI       1220011559559   Pluit periode Jan 2023                                     12,740,000    13,000,000          -         260,000        12,740,000
                                                 HIJAU TEDUH SAKA PERSADA, PT, Biaya atas
                                                 Pemakaian Listrik di Gedung Sastra Graha Periode 10
648   09-Feb-23    MANDIRI       1220011559559   December 2022 - 10 Januari 2022                              130,449       144,943           -          14,494           130,449
                                                 HIJAU TEDUH SAKA PERSADA, PT, Biaya atas
                                                 Pemakaian Listrik di Gedung Sastra Graha Periode 10
649   09-Feb-23    MANDIRI       1220011559559   December 2022 - 10 Januari 2022                              145,260       161,400           -          16,140           145,260
                                                 INDOKARYA SUKSES BERSAMA, PT, Biaya atas
                                                 Pemakaian Listrik di Apartemen Pluit Sea View
650   09-Feb-23    MANDIRI       1220011559559   Periode 26 Dec 2022 - 25 Jan 2023                           1,099,674     1,221,860          -         122,186         1,099,674
                                                 INDOSAT TBK, PT, Biaya Sewa Domestic Ethernet Link
                                                 (MPLS) MSC Gatsu Denpasar Bali to KPPTI Lt. 6
651   09-Feb-23    MANDIRI       1220011559559   Jakarta periode Jan 2023                                  114,460,000   105,010,000   11,550,000     2,100,000       114,460,000
                                                 INDOSAT TBK, PT, Biaya Sewa Domestic Ethernet Link
                                                 (MPLS) MSC Gatsu Denpasar Bali to KPPTI Lt. 6
652   09-Feb-23    MANDIRI       1220011559559   Jakarta periode Jan 2023                                    4,360,000     4,000,000     440,000         80,000         4,360,000
                                                 INDOSAT TBK, PT, Biaya Sewa Domestic Ethernet Link
                                                 (MPLS) MSC Gatsu Denpasar Bali to KPPTI Lt. 6
653   09-Feb-23    MANDIRI       1220011559559   Jakarta periode Jan 2023                                    4,360,000     4,000,000     440,000         80,000         4,360,000
                                                 INTILAND DEVELOPMENT TBK, PT (JAKARTA), Biaya
                                                 atas Pemakaian Listrik di Gedung Intiland Jakarta
654   09-Feb-23    MANDIRI       1220011559559   periode 26 Nov 2022 - 25 Dec 2022                            551,535       612,816           -          61,281           551,535

                                                 JAKARTA INTILAND, PT, Biaya atas Pemakaian Listrik
655   09-Feb-23    MANDIRI       1220011559559   di Ramayana Jatinegara Periode Januari 2023                  386,681       382,853       42,113         38,285           386,681
                                                 KRAKATAU SARANA PROPERTI, PT, Biaya atas
                                                 Pemakaian Listrik di Krakatau Steel Group periode
656   09-Feb-23    MANDIRI       1220011559559   Dec 2022                                                       37,864       37,488        4,124          3,748            37,864
                                                 LESTARI MAHADIBYA, PT, Biaya Pemakaian Listrik di
                                                 Summarecon Mal Serpong 2 periode 11 Dec 2022 -
657   09-Feb-23    MANDIRI       1220011559559   10 Jan 2023                                                  705,772       698,784       76,866         69,878           705,772
                                                 LESTARI MAHADIBYA, PT, Biaya Pemakaian Listrik di
                                                 Summarecon Mal Serpong 2 periode 11 Dec 2022 -
658   09-Feb-23    MANDIRI       1220011559559   10 Jan 2023                                                  953,604       944,162      103,858         94,416           953,604
                                                 LESTARI MAHADIBYA, PT, Biaya Pemakaian Listrik di
                                                 Summarecon Mal Serpong 2 periode 11 Dec 2022 -
659   09-Feb-23    MANDIRI       1220011559559   10 Jan 2023                                                  284,891       282,069       31,028         28,206           284,891
                                                 LESTARI MAHADIBYA, PT, Biaya Pemakaian Listrik di
                                                 Summarecon Mal Serpong 2 periode 11 Dec 2022 -
660   09-Feb-23    MANDIRI       1220011559559   10 Jan 2023                                                  330,312       327,041       35,975         32,704           330,312
                                                 LINK NET TBK, PT, Link Net IDC D3 Jakarta to NIX Bali
661   09-Feb-23     BCA           3193058058     B00573-009 10Gbps periode Jan 2023                        201,650,000   185,000,000   20,350,000     3,700,000       201,650,000
                                                 LINK NET TBK, PT, Link Net IDC D3 Jakarta to NIX Bali
662   09-Feb-23     BCA           3193058058     B00573-009 10Gbps periode Jan 2023                          9,810,000     9,000,000     990,000        180,000         9,810,000
                                                 LINK NET TBK, PT, Link Net IDC D3 Jakarta to NIX Bali
663   09-Feb-23     BCA           3193058058     B00573-009 10Gbps periode Jan 2023                          2,725,000     2,500,000     275,000         50,000         2,725,000
                                                 MEDIA NUSANTARA DATA GLOBAL, PT, Sewa
                                                 Crossconnect Fiber Optic in Data Center CDCI - 1 Port
664   09-Feb-23    MANDIRI       1220011559559   REQ/21FEB19/00000008 periode Des 2022                       1,635,000     1,500,000     165,000         30,000         1,635,000
                                                 MEDIA NUSANTARA DATA GLOBAL, PT, Sewa Full
                                                 Rack Server Cabinet 45U periode Des 2022, Biaya
                                                 Sewa Penempatan OTB fiber in NER periode Des
665   09-Feb-23    MANDIRI       1220011559559   2022                                                        2,180,000     2,000,000     220,000         40,000         2,180,000
                                                 MEDIA NUSANTARA DATA GLOBAL, PT, Sewa Full
                                                 Rack Server Cabinet 45U periode Des 2022, Biaya
                                                 Sewa Penempatan OTB fiber in NER periode Des
666   09-Feb-23    MANDIRI       1220011559559   2022                                                       10,900,000    10,000,000    1,100,000       200,000        10,900,000
Page 59
      TANGGAL
    PENGELUARAN                 NOMOR REKENING
       DI BANK  REKENING BANK     BANK YANG                                                               NILAI MUTASI                   NILAI YANG DIBAYARKAN
NO.  STATEMENT YANG DIGUNAKAN     DIGUNAKAN              NAMA VENDOR DAN KETERANGAN                          BANK          DPP           PPN             PPh       NET DIBAYARKAN
                                                 MEGA AKSES PERSADA, PT, Sewa Layanan Jabalink
                                                 1Gbps P2P dari IDC Duren Tiga ke Jabalink Bali Tower
667   09-Feb-23    MANDIRI       1220011559559   Surabaya Omadata Center periode Jan 2023                     8,720,000     8,000,000     880,000        160,000         8,720,000
                                                 MEGA AKSES PERSADA, PT, Sewa Layanan Jabalink
                                                 1Gbps P2P dari IDC Duren Tiga ke Jabalink Bali Tower
668   09-Feb-23    MANDIRI       1220011559559   Surabaya Omadata Center periode Jan 2023                    25,070,000    23,000,000    2,530,000       460,000        25,070,000
                                                 MEGA PLAZA, PT, Biaya atas Pemakaian Listrik di
669   09-Feb-23    MANDIRI       1220011559559   Gedung Mega Plaza periode Dec 2022                            168,189       166,524       18,317         16,652           168,189
                                                 MENARA DUTA, PT, Biaya atas Pemakaian Listrik
670   09-Feb-23    MANDIRI       1220011559559   Menara Duta Periode Dec 2022                                  128,406       127,134       13,985         12,713           128,406
                                                 MENARA THAMRIN, PT, Biaya atas Pemakaian Listrik
                                                 di Gedung Menara Thamrin Suite 21 & 6 periode
671   09-Feb-23    MANDIRI       1220011559559   December 2022                                                 209,513       207,438       22,818         20,743           209,513

                                                 MULIA INTIPELANGI, PT, Biaya atas Pemakaian Listrik
672   09-Feb-23    MANDIRI       1220011559559   Mall Taman Anggrek (GL-L5) Periode Jan 2023                  3,786,217     3,748,729     412,360        374,872         3,786,217
                                                 PENGELOLA LANDMARK PLUIT, PT, Biaya atas
                                                 Pemakaian Listrik Landmark Pluit (GF-A) periode 16
673   09-Feb-23    MANDIRI       1220011559559   November 2022 - 15 December 2022                              155,873       154,329       16,976         15,432           155,873
                                                 PERMADANI PROPERTINDO DEVELOPMENT, PT,
                                                 Biaya atas Pemakaian Listrik di Wisma Kodel periode
674   09-Feb-23    MANDIRI       1220011559559   Dec 2022                                                      229,775       227,500       25,025         22,750           229,775
                                                 PERSADA BATAVIA MANDIRI, PT, Biaya Pengiriman
                                                 Material Door Sensor, Door Lock, ODC, Modular dari
675   09-Feb-23    MANDIRI       1220011559559   PT Nobi Putra Angkasa ke WH Serpong                          1,025,685     1,035,000      11,385         20,700         1,025,685
                                                 PGAS TELEKOMUNIKASI NUSANTARA, PT, Tagihan
                                                 Sewa IPLC Jakarta - Equinix Singapore periode Jan
676   09-Feb-23    MANDIRI       1220011559559   2023                                                       359,720,000   330,020,000   36,300,000     6,600,000       359,720,000
                                                 PPPSRS SEMENTARA PERKANTORAN EKSEKUTIF
                                                 SATRIO TOWER, Biaya atas Pemakaian Listrik di
677   09-Feb-23    MANDIRI       1220011559559   Gedung Satrio Tower periode November 2022                     229,905       227,628       25,039         22,762           229,905
                                                 PPPSRS SEMENTARA PERKANTORAN EKSEKUTIF
                                                 SATRIO TOWER, Biaya atas Pemakaian Listrik di
678   09-Feb-23    MANDIRI       1220011559559   Gedung Satrio Tower periode November 2022                     245,382       242,953       26,724         24,295           245,382
                                                 PRIMACOM INTERBUANA, PT, Sewa Local Loop 25
                                                 Mbps Diskominfo Kota Bandung CCTV sebanyak 54
679   09-Feb-23    MANDIRI       1220011559559   Titik periode Des 2022                                      58,860,000    54,000,000    5,940,000     1,080,000        58,860,000
                                                 PRIMACOM INTERBUANA, PT, Sewa Local Loop 25
                                                 Mbps Diskominfo Kota Bandung CCTV sebanyak 54
680   09-Feb-23    MANDIRI       1220011559559   Titik periode Des 2022                                       7,848,000     7,200,000     792,000        144,000         7,848,000
                                                 SEDHANA SARI BALI, PT, Tagihan Pemakaian Listrik
                                                 Site M-39 Pantai Berawa Periode Bulan Juli 2022 -
681   09-Feb-23    MANDIRI       1220011559559   Desember 2022                                               47,388,373    47,388,373          -             -          47,388,373
                                                 SENAYAN TRIKARYA SEMPANA, PT, Biaya Pemakaian
                                                 Listrik di Plaza Senayan Arcadia periode 28 Nov 2022 -
682   09-Feb-23    MANDIRI       1220011559559   28 Dec 2022                                                     91,264       90,360        9,940          9,036            91,264
                                                 SENAYAN TRIKARYA SEMPANA, PT, Biaya Pemakaian
                                                 Listrik di Sentral Senayan I Periode 28 Nov 2022 - 28
683   09-Feb-23    MANDIRI       1220011559559   Dec 2022                                                        73,114       72,390        7,963          7,239            73,114
                                                 SERPONG CIPTA KREASI, PT, Biaya atas Pemakaian
                                                 Listrik di Gedung Serpong M-Town Residence Periode
684   09-Feb-23    MANDIRI       1220011559559   December 2022                                                 949,428       940,027      103,403         94,002           949,428
                                                 SERPONG MAS TELEMATIKA, PT, Sewa Local Loop
                                                 Dedicated dan Broadband West BSD untuk 44 Tenant
685   09-Feb-23    MANDIRI       1220011559559   periode Nov 2022                                            64,678,068    59,337,677    6,527,144     1,186,753        64,678,068
                                                 SMART TELECOM, PT, Tagihan Telepon Divisi Call
                                                 Center, Product & Marketing dan FTTx Opr Bulan Jan
686   09-Feb-23    MANDIRI       1220011559559   2023                                                          176,064       158,616       17,448            -             176,064
                                                 SMARTFREN TELECOM TBK, PT, Tagihan Telepon
                                                 Divisi Call Center dan Product & Marketing Bulan Jan
687   09-Feb-23    MANDIRI       1220011559559   2023                                                          116,738       105,169       11,569            -             116,738
                                                 TOWER BERSAMA, PT, Sewa Local Loop Metro E 100
                                                 Mbps Kawasan Nusa Dua Bali (Tower Bersama
688   09-Feb-23    MANDIRI       1220011559559   Group) periode 24 Jan 2023 - 23 Feb 2023                     9,374,000     8,600,000     946,000        172,000         9,374,000
                                                 TRIMITRA PUTRA MANDIRI, PT, Reimbursement
                                                 Salary Outsource Div. Direct Sales Periode Des 2022,
                                                 Reimbursement Insentif Outsource Div. Direct Sales
689   09-Feb-23    MANDIRI       1220011559559   periode Nov 2022                                           121,983,840   121,176,000     987,360        179,520       121,983,840
                                                 TRIMITRA PUTRA MANDIRI, PT, Reimbursement
                                                 Salary Outsource Div. Direct Sales Periode Des 2022,
                                                 Reimbursement Insentif Outsource Div. Direct Sales
690   09-Feb-23    MANDIRI       1220011559559   periode Nov 2022                                            25,145,316    24,978,791     203,531         37,006        25,145,316
                                                 FPU PENJAGA SITE, Pembayaran penjaga site dan
                                                 uang canang bulan Januari 2023( Non tansfer Bank
691   09-Feb-23   SINARMAS        00002999994    Sinarmas di 3 site BTS )                                     2,400,000     2,400,000          -             -           2,400,000
                                                 INDONESIA COMNETS PLUS, PT, Sewa Local Loop 5
692   09-Feb-23    MANDIRI       1220011559559   Mbps Diskominfo Kab. Purwakarta Warudoyong                   2,991,179     2,744,201     301,862         54,884         2,991,179
                                                 INDONESIA COMNETS PLUS, PT, Sewa Local Loop 5
693   09-Feb-23    MANDIRI       1220011559559   Mbps Diskominfo Kab. Purwakarta Warudoyong                  12,561,215    11,524,050    1,267,646       230,481        12,561,215
                                                 JALA LINTAS MEDIA, PT, Sewa Local Loop 30Mbps -
                                                 BOD PT Darya Varia Laboratories periode 13 -16 Sept
694   09-Feb-23    MANDIRI       1220011559559   2022                                                         1,635,000     1,500,000     165,000         30,000         1,635,000
                                                 LOGISTIC, Uang Muka Beban Umum atas Biaya TKBM
                                                 unloading 250 tiang 7 meter PO Pembelian
                                                 1010025773 Vendor PT Solo Dunia Baja di Gudang
695   09-Feb-23    MANDIRI       1220011559559   Serpong - Trf                                                1,000,000     1,000,000          -             -           1,000,000
                                                 PERSADA BATAVIA MANDIRI, PT, Biaya Pengiriman
                                                 Material Kabel ADSS 96 Core dari PT Prysmian Cable
696   09-Feb-23    MANDIRI       1220011559559   ke PT Kaliabang Jaya Pratama                                 4,459,500     4,500,000      49,500         90,000         4,459,500
                                                 PERSADA BATAVIA MANDIRI, PT, Biaya Pengiriman
                                                 Material Kabel ADSS 96 Core dari PT Prysmian Cable
697   09-Feb-23    MANDIRI       1220011559559   ke PT Kaliabang Jaya Pratama                                 1,436,950     1,450,000      15,950         29,000         1,436,950
                                                 PERSADA BATAVIA MANDIRI, PT, Biaya Pengiriman
                                                 Material Kabel ADSS 96 Core dari PT Prysmian Cable
698   09-Feb-23    MANDIRI       1220011559559   ke PT Kaliabang Jaya Pratama                                 1,436,950     1,450,000      15,950         29,000         1,436,950
Page 60
      TANGGAL
    PENGELUARAN                 NOMOR REKENING
       DI BANK  REKENING BANK     BANK YANG                                                             NILAI MUTASI                     NILAI YANG DIBAYARKAN
NO.  STATEMENT YANG DIGUNAKAN     DIGUNAKAN                NAMA VENDOR DAN KETERANGAN                      BANK            DPP           PPN             PPh       NET DIBAYARKAN
                                                 PERSADA BATAVIA MANDIRI, PT, Biaya Pengiriman
                                                 Material Kabel ADSS 96 Core dari PT Prysmian Cable
699   09-Feb-23    MANDIRI       1220011559559   ke PT Kaliabang Jaya Pratama                               1,189,200      1,200,000       13,200         24,000         1,189,200
                                                 SUBURMITRA GRAFISTAMA, PT, Pembelian Flyer
                                                 Promo Serbu Awal Tahun Periode Desember untuk
                                                 Keperluan Branding dan Support Sales Sebanyak
700   09-Feb-23    MANDIRI       1220011559559   44.900                                                    17,618,760     16,164,000     1,778,040       323,280        17,618,760
                                                 SUBURMITRA GRAFISTAMA, PT, Pembelian Flyer
                                                 Promo Serbu Awal Tahun Periode Desember untuk
                                                 Keperluan Branding dan Support Sales Sebanyak
701   09-Feb-23    MANDIRI       1220011559559   44.900                                                      283,400         260,000       28,600          5,200           283,400
                                                 BIBIT, Mr, Biaya Perbaikan Kabel Kendor karena
                                                 aksesoris tiang terlepas di Cluster Banjar Taman
                                                 Griya dan Pekerjaan Relokasi P07_18 Link Office
702   09-Feb-23   SINARMAS        00002999994    Marlboro                                                   1,570,828      1,619,410           -          48,582         1,570,828
                                                 PLN PERSERO, PT, Biaya Pembelian Token Pulsa
                                                 Listrik Phase 02 Region Jawa Barat Periode February
703   10-Feb-23    MANDIRI       1220011559559   2023                                                      66,094,000     66,094,000           -             -          66,094,000
                                                 FPU PENJAGA SITE, Pembayaran penjaga site dan
                                                 uang canang bulan Januari 2023 (Transfer Bank
704   10-Feb-23   SINARMAS        0000240408     Sinarmas di 65 site BTS )                                 38,200,000     38,200,000           -             -          38,200,000
                                                 AP FIELD OPERATION & OPTIMIZING, Uang Muka
                                                 Beban Umum atas Biaya Kompensasi Listrik Project
                                                 Jakwifi Batch 2 ( 1692 Pole -1747 Penerima
705   13-Feb-23   SINARMAS        0000240408     Kompensasi) Periode 8, Februari - Mei 2023 - Trf         888,600,000    888,600,000           -             -         888,600,000
                                                 AMAZANA KENCANA, PT, Tagihan Revenue Sharing
                                                 Bali Fiber di Apartement Amazana Periode Oktober -
706   14-Feb-23    MANDIRI       1220011559559   Desember 2022                                              4,196,831      3,850,304      423,533         77,006         4,196,831
                                                 INFRA YES SOLUSINDO, PT, Uang Muka Beban Umum
                                                 atas Open Booth Green Pramuka City (15 Januari - 14
707   14-Feb-23    MANDIRI       1220011559559   Februari 2023) - PR : 1010032294 - Trf                     3,920,000      3,920,000           -             -           3,920,000
                                                 OMADATA PADMA INDONESIA, PT, Biaya Sewa
                                                 Management Cable MMR 1U Open Rack Periode Jan
                                                 2023, Biaya Sewa Management Cable - MMR 1U OTB
708   14-Feb-23    MANDIRI       1220011559559   Periode Jan 2023 (Omadata)                                 1,635,000      1,500,000      165,000         30,000         1,635,000
                                                 OMADATA PADMA INDONESIA, PT, Biaya Sewa
                                                 Management Cable MMR 1U Open Rack Periode Jan
                                                 2023, Biaya Sewa Management Cable - MMR 1U OTB
709   14-Feb-23    MANDIRI       1220011559559   Periode Jan 2023 (Omadata)                                 2,180,000      2,000,000      220,000         40,000         2,180,000

                                                 PERHIMPUNAN PEMILIK DAN PENGHUNI SATUAN
                                                 RUMAH SUSUN APARTEMENT THE ELEMENTS, Biaya
                                                 Management Fee atas Revenue Sharing periode
710   14-Feb-23    MANDIRI       1220011559559   Febaruari 2022 di Apartement The Element                   1,447,770      1,477,316           -          29,546         1,447,770

                                                 PPPSRS CBD PLUIT, Tagihan Revenue Sharing periode
711   14-Feb-23    MANDIRI       1220011559559   Oktober - Desember 2022 di Apartement CBD Pluit           95,083,452     97,023,930           -       1,940,478        95,083,452

                                                 QONTAK TUMBUH MAKMUR, PT, Sewa Software For
                                                 Call Center Qontak - Whatsapp Enterprise Package
712   14-Feb-23    MANDIRI       1220011559559   30 Agent periode 26 Des 2022 - 25 Des 2023                70,632,000     64,800,000     7,128,000     1,296,000        70,632,000
                                                 SUMBER BERKAT JAYA ABADI, PT, Biaya IPL untuk
                                                 Ruko BizHub Serpong untuk unit 18 periode Februari
713   14-Feb-23    MANDIRI       1220011559559   2023 - Desember 2023                                      13,212,500     13,212,500           -             -          13,212,500
                                                 SUMBER BERKAT JAYA ABADI, PT, Biaya IPL untuk
                                                 Ruko BizHub Serpong untuk unit 18 periode Februari
714   14-Feb-23    MANDIRI       1220011559559   2023 - Desember 2023                                       8,812,500      8,812,500           -             -           8,812,500
                                                 SUMBER BERKAT JAYA ABADI, PT, Biaya IPL untuk
                                                 Ruko BizHub Serpong untuk unit 18 periode Februari
715   14-Feb-23    MANDIRI       1220011559559   2023 - Desember 2023                                       8,820,000      8,820,000           -             -           8,820,000
                                                 TIGA KREASI KOMUNIKA, PT, Pembelian Kalender
                                                 2023 Periode Desember 2022 keperluan Branding
716   14-Feb-23    MANDIRI       1220011559559   dan Support Sales Residential Sebanyak 500 Pcs            14,715,000     13,500,000     1,485,000       270,000        14,715,000
                                                 BERUANG ADVERTISING SOLUSINDO, PT, Pembelian
                                                 Spanduk General New Area RFS Periode Januari 2023
                                                 keperluan Branding dan Support Sales Residential
717   14-Feb-23    MANDIRI       1220011559559   Sebanyak 100 Pcs                                           3,270,000      3,000,000      330,000         60,000         3,270,000
                                                 GERAI LISTRIK PASAR MOBIL KEMAYORAN, Biaya
                                                 Tagihan Listrik site Gunung Sahari Utara-008, Gunung
                                                 Sahari Utara-009, & Danau Sunter dll-003 periode
718   15-Feb-23    MANDIRI       1220011559559   Januari 2023                                               5,354,182      5,463,451           -         109,269         5,354,182

                                                 PLN PERSERO, PT, Pengajuan Token Pulsa Listrik
719   15-Feb-23    MANDIRI       1220011559559   Phase 02 Region Jawa Tengah Periode Februari 2023        136,252,000    136,252,000           -             -         136,252,000
                                                 IRWAN PRADNYA DESIGN, Ud, jasa desain aksara Bali
720   15-Feb-23   SINARMAS        00002999994    visual utk 31 ID site BTS                                  1,511,250      1,550,000           -          38,750         1,511,250
                                                 ZAENAL ABIDIN, Mr., Biaya cetak Vinil untuk 32 site
721   15-Feb-23   SINARMAS        00002999994    BTS (Bahan Frontlite Korea)                                2,893,800      2,968,000           -          74,200         2,893,800
                                                 PLN PERSERO, PT, Biaya Tagihan PLN Autodebet
722   16-Feb-23    MANDIRI       1220011559559   untuk 264 site area Bali periode Februari 2023         1,257,898,762   1,257,898,762          -             -        1,257,898,762
                                                 AP FIELD OPERATION & OPTIMIZING, Kompensasi
723   16-Feb-23   SINARMAS        0000240408     Listrik Warga Project Jakwifi Batch 3                    139,350,000    139,350,000           -             -         139,350,000
                                                 PLN PERSERO, PT, Biaya PLN Autodebet Jawa Timur
724   16-Feb-23    MANDIRI       1220011559559   Periode Februari 2023                                    182,625,385    182,625,385           -             -         182,625,385
                                                 PLN PERSERO, PT, Biaya Tagihan KWH PLN
                                                 Pascabayar Region Jawa Tengah Periode Februari
725   16-Feb-23    MANDIRI       1220011559559   2023                                                     159,580,223    159,580,223           -             -         159,580,223
                                                 PLN PERSERO, PT, Biaya Tagihan KWH PLN Pasca
726   16-Feb-23    MANDIRI       1220011559559   Bayar Region Jabodetabek Periode Februari 2023         2,438,097,206   2,438,097,206          -             -        2,438,097,206
                                                 PLN PERSERO, PT, Biaya PLN Auto Debet Region Jawa
727   16-Feb-23    MANDIRI       1220011559559   Barat Periode February 2023                               61,425,149     61,425,149           -             -          61,425,149
                                                 JELAJAH DATA SEMESTA, PT, Dedicated Internet
728   17-Feb-23    MANDIRI       1220011559559   Bandwidth periode Feb 2023                               539,550,000    495,000,000    54,450,000     9,900,000       539,550,000
Page 61
      TANGGAL
    PENGELUARAN                 NOMOR REKENING
       DI BANK  REKENING BANK     BANK YANG                                                              NILAI MUTASI                   NILAI YANG DIBAYARKAN
NO.  STATEMENT YANG DIGUNAKAN     DIGUNAKAN                NAMA VENDOR DAN KETERANGAN                       BANK          DPP           PPN             PPh       NET DIBAYARKAN
                                                 MENARA DUTA, PT, Uang Muka Beban Umum atas
                                                 BIaya Open Booth Balifiber di Menara Duta periode
729   17-Feb-23    MANDIRI       1220011559559   22 Februari 2023 - Trf                                      1,010,000     1,010,000          -             -           1,010,000
                                                 PLN PERSERO, PT, Pengajuan Biaya Pengisian
                                                 Token/Stroom untuk 25 site CCTV Bandung - PO :
                                                 1010034407 - Trf - Sudah dibayarkan ADV-
730   17-Feb-23    MANDIRI       1220011559559   FPU/JABAR/22/XI/004                                            62,750       62,750           -             -              62,750
                                                 QONTAK TUMBUH MAKMUR, PT, Uang Muka Beban
                                                 Umum atas Biaya Top Up Whatsapp (WA)
731   17-Feb-23    MANDIRI       1220011559559   Conversation Credit (Prepaid) Februari 2023 - Trf           6,540,000     6,540,000          -             -           6,540,000
                                                 TELEKOMUNIKASI SELULAR, PT, Biaya Paket Data
                                                 Pascabayar Telkomsel Mikrotik untuk Monitoring
                                                 Alarm. Periode Februari 2023 Jawa Tengah sebanyak
732   17-Feb-23    MANDIRI       1220011559559   10 MSISDN                                                   1,054,500     1,054,500          -             -           1,054,500
                                                 TELEKOMUNIKASI SELULAR, PT, Biaya Paket Data
                                                 Pascabayar Telkomsel Mikrotik untuk Monitoring
                                                 Alarm. Periode Februari 2023 Jawa Tengah sebanyak
733   17-Feb-23    MANDIRI       1220011559559   7 MSISDN                                                     555,000       555,000           -             -             555,000
                                                 TELKOM INDONESIA, PT, Biaya Paket Broadband
                                                 Indihome for Monitoring (CSR) CCTV, FO not ready.
734   17-Feb-23    MANDIRI       1220011559559   Periode Februari 2023 area Yogyakarta                       1,265,400     1,265,400          -             -           1,265,400
                                                 PLN PERSERO, PT, Biaya Pengisian Token Listrik KWH
735   17-Feb-23    MANDIRI       1220011559559   PLN Site Pegadungan-027                                      500,000       500,000           -             -             500,000
                                                 TOWER OPERATION, Uang Muka Beban Umum atas
                                                 FPU Biaya Pembelian Top Up Kuota XL Mikrotik
                                                 Monitoring NOC Periode Pemakaian Untuk Maret
736   20-Feb-23    MANDIRI       1220011559559   2023 - Trf                                                   313,500       313,500           -             -             313,500
                                                 AMAZANA KENCANA, PT, Biaya atas Pemakaian
737   20-Feb-23    MANDIRI       1220011559559   Listrik Apartemen Amazana Periode Jan 2023                   373,516       342,675       37,694          6,853           373,516
                                                 BANGUNMUSTIKA INTIPERSADA, PT, Biaya atas
                                                 Pemakaian Listrik dan Air di ITC CIpulir Mas Lt.
                                                 4/B.071 (Call Center) Periode 18 Desember 2022 - 17
738   20-Feb-23    MANDIRI       1220011559559   Januari 2022                                               11,333,612    12,592,902          -       1,259,290        11,333,612
                                                 GRAHA IRAMA, PT, Sewa Penempatan Perangkat di
                                                 Gedung Graha Irama periode 01 Mar 2023 - 29 Feb
739   20-Feb-23    MANDIRI       1220011559559   2024                                                       35,000,000    38,888,888          -       3,888,888        35,000,000
                                                 INFRA YES SOLUSINDO, PT, Biaya Management Fee
                                                 atas Revenue Sharing periode Desember 2022 di
740   20-Feb-23    MANDIRI       1220011559559   Apartement Green Pramuka                                   32,477,899    33,140,713          -         662,814        32,477,899
                                                 MULIA CEMERLANG DIAN PERSADA, PT, Biaya atas
                                                 Pemakaian Listrik di Wisma GKBI periode Januari
741   20-Feb-23    MANDIRI       1220011559559   2022                                                         557,816       552,293       60,752         55,229           557,816
                                                 PERHIMPUNAN PEMILIK DAN PENGHUNI SATUAN
                                                 RUMAH SUSUN HUNIAN DAN NON HUNIAN MAL &
                                                 KONDOMINIUM TAMAN ANGGREK, Biaya Sewa
                                                 Penempatan Perangkat Telekomunikasi di Mall &
                                                 Kondominium Taman Anggrek Berdasarkan Profit
742   20-Feb-23    MANDIRI       1220011559559   Sharing Periode Januari 2023                               13,891,162    15,434,624          -       1,543,462        13,891,162
                                                 PPRSP VICTORIA, Sewa Penempatan Perangkat di
743   20-Feb-23    MANDIRI       1220011559559   Gedung Victoria periode 18 Jan 2023 - 17 Jan 2024          12,150,000    13,500,000          -       1,350,000        12,150,000
                                                 IOT PLUS TEKNOLOGI, PT, DP 30% atas Pengadaan
                                                 Server Inspur NMS NSP - NF5280M6, Waranty
                                                 Service dan Hardware Installation Server NMS NSP
744   20-Feb-23    MANDIRI       1220011559559   sebanyak 4 Unit                                           204,676,646   184,504,554   20,295,500       123,408       204,676,646
                                                 AWAN KILAT SEMESTA, PT, Tagihan Revenue Sharing
                                                 periode Desember 2022 atas penjualan produk
745   22-Feb-23    MANDIRI       1220011559559   BaliCloud Tenant PT Adia Pradipta Lestari                  30,605,400    31,230,000          -         624,600        30,605,400
                                                 BANGUNMUSTIKA INTIPERSADA, PT, Biaya atas
                                                 Pemakaian Listrik di ITC Cipulir Mas Lt 4/F.035 (IKR)
746   22-Feb-23    MANDIRI       1220011559559   Periode 18 Desember 2022 - 17 Januari 2022                  1,775,667     1,972,963          -         197,296         1,775,667
                                                 DUTA TELEKOMINDO NUSANTARA, PT, Tagihan
                                                 Revenue Sharing Penempatan Jaringan dan Layanan
                                                 Bali Fiber di Gedung Chase Plaza periode periode
747   22-Feb-23    MANDIRI       1220011559559   Oktober 2022 - Desember 2022                                1,590,750     1,575,000     173,250        157,500         1,590,750
                                                 DUTA TELEKOMINDO NUSANTARA, PT, Tagihan
                                                 Revenue Sharing Penempatan Jaringan dan Layanan
                                                 Bali Fiber di Gedung Chase Plaza periode periode
748   22-Feb-23    MANDIRI       1220011559559   Oktober 2022 - Desember 2022                                 519,499       514,355       56,579         51,435           519,499
                                                 DUTA TELEKOMINDO NUSANTARA, PT, Tagihan
                                                 Revenue Sharing Penempatan Jaringan dan Layanan
                                                 Bali Fiber di Gedung Chase Plaza periode periode
749   22-Feb-23    MANDIRI       1220011559559   Oktober 2022 - Desember 2022                                1,262,500     1,250,000     137,500        125,000         1,262,500
                                                 DWIBINA PRIMA, PT, Biaya atas Pemakaian Listrik di
750   22-Feb-23    MANDIRI       1220011559559   Wisma BSG periode Jan 2023                                     87,679       86,811        9,549          8,681            87,679
                                                 GOVERNMENT RELATIONS, Uang Muka Beban Umum
                                                 atas Biaya Pembelian Materai sebanyak 100 buah
                                                 untuk keperluan Administrasi Govrel - PR :
751   22-Feb-23    MANDIRI       1220011559559   1010032362 - Trf                                            1,000,000     1,000,000          -             -           1,000,000
                                                 GRAHA LESTARI INTERNUSA, PT, Tagihan Revenue
                                                 Sharing 30% Jasa Koneksi Internet Wework di
                                                 Gedung Noble House periode Oktober - Desember
752   22-Feb-23    MANDIRI       1220011559559   2022                                                       33,342,120    33,012,000    3,631,320     3,301,200        33,342,120

                                                 LIZA CHRISTINA GARMENT INDUSTRY, PT, Biaya atas
753   22-Feb-23    MANDIRI       1220011559559   Pemakaian Listrik di Unity Building periode Jan 2023         505,000       500,000       55,000         50,000           505,000
                                                 MAKMUR ORIENT JAYA, PT, Biaya Kehandalan Atas
                                                 Pemakaian Listrik di Gedung Sentra Summarecon
                                                 Bekasi Ruang Panel BZ2 periode 13 Dec 2022 - 12
754   22-Feb-23    MANDIRI       1220011559559   Jan 2023                                                     162,044       160,440       17,648         16,044           162,044
                                                 MENARA PRAMBANAN, PT, Tagihan Sharing Revenue
                                                 Bali Fiber di Apartement Poins Square periode
755   22-Feb-23    MANDIRI       1220011559559   Oktober 2022 - Desember 2022                                1,252,703     1,240,300     136,433        124,030         1,252,703
                                                 MUSTIKA RATU CENTRE, PT, Biaya atas Pemakaian
                                                 Listrik di Gedung Mustika Ratu Centre periode Jan
756   22-Feb-23    MANDIRI       1220011559559   2023                                                         215,642       213,506       23,486         21,350           215,642
Page 62
      TANGGAL
    PENGELUARAN                 NOMOR REKENING
       DI BANK  REKENING BANK     BANK YANG                                                               NILAI MUTASI                 NILAI YANG DIBAYARKAN
NO.  STATEMENT YANG DIGUNAKAN     DIGUNAKAN                NAMA VENDOR DAN KETERANGAN                        BANK         DPP          PPN             PPh       NET DIBAYARKAN
                                                 PENGELOLA LANDMARK PLUIT, PT, Biaya atas
                                                 Pemakaian Listrik Landmark Pluit (GF-E) periode 16
757   22-Feb-23    MANDIRI       1220011559559   December 2022 - 15 Januari 2023                               137,708      136,344      14,998         13,634           137,708
                                                 PENGELOLA LANDMARK PLUIT, PT, Biaya atas
                                                 Pemakaian Listrik Landmark Pluit (GF-E) periode 16
758   22-Feb-23    MANDIRI       1220011559559   December 2022 - 15 Januari 2023                               124,276      123,045      13,535         12,304           124,276
                                                 PENGELOLA LANDMARK PLUIT, PT, Biaya atas
                                                 Pemakaian Listrik Landmark Pluit (GF-E) periode 16
759   22-Feb-23    MANDIRI       1220011559559   December 2022 - 15 Januari 2023                               159,994      158,409      17,425         15,840           159,994
                                                 PENGELOLA LANDMARK PLUIT, PT, Biaya atas
                                                 Pemakaian Listrik Landmark Pluit (GF-E) periode 16
760   22-Feb-23    MANDIRI       1220011559559   December 2022 - 15 Januari 2023                               158,315      156,747      17,242         15,674           158,315
                                                 PENGELOLA PUSAT BELANJA, PT, Biaya atas
                                                 Pemakaian Listrik di Mall Bassura periode 16 Dec
761   22-Feb-23    MANDIRI       1220011559559   2022 - 15 Jan 2023                                            792,540      784,693      86,316         78,469           792,540
                                                 SUKA DUKA GIRI HILL, Biaya Management Fee atas
                                                 Revenue Sharing periode Desember 2022 di Suka
762   22-Feb-23    MANDIRI       1220011559559   Duka Raya Kampial - Perumahan Giri Hill                      2,276,801    2,371,668        -           94,867         2,276,801
                                                 SUMMARECON AGUNG, PT, Biaya atas Pemakaian
763   22-Feb-23    MANDIRI       1220011559559   Listrik di The Kensington periode Januari 2023                131,487      130,185      14,320         13,018           131,487

                                                 TRI PURA INDAH PERSADA, PT, Biaya atas Pemakaian
764   22-Feb-23    MANDIRI       1220011559559   Listrik Gd. Wirausaha Kuningan Periode Jan 2023               286,188      283,354      31,169         28,335           286,188
                                                 IMAM TAUFIK, Biaya Pekerjaan Perbaikan FO Cut
                                                 Link Site_13 Pecatu to Site_16 GWK (TT. H1222-010)
765   22-Feb-23   SINARMAS        00002999994    Jl. Pecatu Uluwatu                                           1,824,376    1,880,800        -           56,424         1,824,376
                                                 NI PUTU DHIAN IRMASARI, SH.,M.Kn, Mrs., Biaya
                                                 Penyusunan Akta Perjanjian Perpanjangan Sewa
766   22-Feb-23   SINARMAS        00002999994    lahan site_06 By Pass                                        1,500,000    1,538,462        -           38,462         1,500,000
                                                 IMAM TAUFIK, Biaya Pekerjaan Perbaikan Pole
                                                 Miring P7_511 SS FO Link Backbone Site_31 to
767   22-Feb-23   SINARMAS        00002999994    BLL_08 Sec#1 Jl Baturiti Bedugul Tabanan-Bali)               1,104,872    1,139,043        -           34,172         1,104,872
                                                 BINTANG MAS UTAMA, CV, Biaya Penggantian
                                                 Kerusakan 1 Unit Tang Ampere Fluke 319 True RMS -
768   22-Feb-23   SINARMAS        00002999994    TX OPS Base Selatan                                          3,940,500    3,550,000    390,500            -           3,940,500
                                                 ANGKUT TEKNOLOGI INDONESIA, PT, Biaya
                                                 Pengiriman Barang Melalui Aplikasi Deliveree
769   24-Feb-23    MANDIRI       1220011559559   periode Jan 2023                                             1,181,472    1,083,919    119,231         21,678         1,181,472
                                                 ANGKUT TEKNOLOGI INDONESIA, PT, Biaya
                                                 Pengiriman Barang Melalui Aplikasi Deliveree
770   24-Feb-23    MANDIRI       1220011559559   periode Jan 2023                                             5,479,581    5,479,581        -              -           5,479,581
                                                 BANGUNMUSTIKA INTIPERSADA, PT, Biaya atas
                                                 Pemakaian Listrik di ITC Cipulir Mas Lt. Dasar - LT. 4
771   24-Feb-23    MANDIRI       1220011559559   periode 18 Dec 2022 - 17 Jan 2023                            1,232,780    1,369,755        -          136,975         1,232,780

                                                 BINAJASA SUMBER SARANA, PT, Reimbursement
772   24-Feb-23    MANDIRI       1220011559559   Insentif Outsource Div. Direct Sales periode Des 2022       95,588,970   94,955,931    773,715        140,676        95,588,970

                                                 BINAJASA SUMBER SARANA, PT, Reimbursement
773   24-Feb-23    MANDIRI       1220011559559   Insentif Outsource Div. Direct Sales periode Des 2022       95,401,306   94,769,509    772,196        140,399        95,401,306

                                                 BINAJASA SUMBER SARANA, PT, Reimbursement
774   24-Feb-23    MANDIRI       1220011559559   Insentif Outsource Div. Direct Sales periode Des 2022       31,495,316   31,286,738    254,929         46,351        31,495,316
                                                 ENLULU SUKSES MAKMUR, PT, Reimbursement
775   24-Feb-23    MANDIRI       1220011559559   Salary Outsource Div. Direct Sales Periode Jan 2023          8,941,367    8,882,153     72,373         13,159         8,941,367
                                                 ENLULU SUKSES MAKMUR, PT, Reimbursement
776   24-Feb-23    MANDIRI       1220011559559   Salary Outsource Div. Direct Sales Periode Jan 2023         13,046,400   12,960,000    105,600         19,200        13,046,400
                                                 GRAHA IRAMA, PT, Biaya atas Pemakaian Listrik di
                                                 Gedung Graha Irama periode 01 Jan 2022 - 01 Feb
777   24-Feb-23    MANDIRI       1220011559559   2023                                                          130,185      144,649         -           14,464           130,185
                                                 ISMAWA TRIMITRA, PT, Biaya atas Pemakaian Listrik
                                                 di Graha Iskandarsyah periode 21 Dec 2022 - 20 Jan
778   24-Feb-23    MANDIRI       1220011559559   2023                                                          155,115      153,578      16,894         15,357           155,115
                                                 KHARISMA INTAN PROPERTI, PT, Biaya atas
                                                 Pemakaian Listrik di Scientia Business Park periode
779   24-Feb-23    MANDIRI       1220011559559   Jan 2023                                                      188,112      186,249      20,487         18,624           188,112
                                                 MAKMUR ORIENT JAYA, PT, Biaya Pemakaian Listrik
                                                 di Gedung Sentra Summarecon Bekasi Ruang Panel
780   24-Feb-23    MANDIRI       1220011559559   BZ3 periode 13 Dec 2022 - 12 Jan 2023                         551,230      545,772      60,035         54,577           551,230
                                                 MAKMUR ORIENT JAYA, PT, Biaya Pemakaian Listrik
                                                 di Gedung Sentra Summarecon Bekasi Ruang Panel
781   24-Feb-23    MANDIRI       1220011559559   BZ3 periode 13 Dec 2022 - 12 Jan 2023                         476,134      471,420      51,856         47,142           476,134
                                                 MAKMUR ORIENT JAYA, PT, Biaya Pemakaian Listrik
                                                 di Gedung Sentra Summarecon Bekasi Ruang Panel
782   24-Feb-23    MANDIRI       1220011559559   BZ3 periode 13 Dec 2022 - 12 Jan 2023                         328,709      325,454      35,800         32,545           328,709
                                                 MAKMUR ORIENT JAYA, PT, Biaya Pemakaian Listrik
                                                 di Gedung Sentra Summarecon Bekasi Ruang Panel
783   24-Feb-23    MANDIRI       1220011559559   BZ3 periode 13 Dec 2022 - 12 Jan 2023                         135,950      134,604      14,806         13,460           135,950
                                                 MAKMUR ORIENT JAYA, PT, Biaya Pemakaian Listrik
                                                 di Gedung Sentra Summarecon Bekasi Ruang Panel
784   24-Feb-23    MANDIRI       1220011559559   BZ3 periode 13 Dec 2022 - 12 Jan 2023                         104,806      103,768      11,414         10,376           104,806
                                                 MAKMUR ORIENT JAYA, PT, Biaya Pemakaian Listrik
                                                 di Gedung Sentra Summarecon Bekasi Ruang Panel
785   24-Feb-23    MANDIRI       1220011559559   BZ3 periode 13 Dec 2022 - 12 Jan 2023                         152,747      151,234      16,636         15,123           152,747
                                                 MAKMUR ORIENT JAYA, PT, Biaya Pemakaian Listrik
                                                 di Gedung Sentra Summarecon Bekasi Ruang Panel
786   24-Feb-23    MANDIRI       1220011559559   BZ3 periode 13 Dec 2022 - 12 Jan 2023                         175,336      173,600      19,096         17,360           175,336
                                                 MENARA CAPITAL INDONUSA, PT, Biaya atas
                                                 Pemakaian Listrik Gedung Palma Tower lt. 11
787   24-Feb-23    MANDIRI       1220011559559   periode Jan 2023                                              103,048      102,027      11,223         10,202           103,048
                                                 MENARA CAPITAL INDONUSA, PT, Biaya atas
                                                 Pemakaian Listrik Gedung Palma Tower lt. B1
788   24-Feb-23    MANDIRI       1220011559559   periode Jan 2023                                              103,048      102,027      11,223         10,202           103,048
Page 63
      TANGGAL
    PENGELUARAN                 NOMOR REKENING
       DI BANK  REKENING BANK     BANK YANG                                                              NILAI MUTASI                     NILAI YANG DIBAYARKAN
NO.  STATEMENT YANG DIGUNAKAN     DIGUNAKAN                NAMA VENDOR DAN KETERANGAN                       BANK            DPP           PPN             PPh       NET DIBAYARKAN
                                                 MORA TELEMATIKA INDONESIA, PT, Biaya
                                                 Aktivasi/OTC Sewa Metro-E 1.5 Gbps NDC Jatinegara -
789   24-Feb-23    MANDIRI       1220011559559   Pop BTS Karawang                                            5,450,000      5,000,000      550,000        100,000          5,450,000
                                                 MULTI USAHA SEJAHTERA BERSAMA, PT,
                                                 Reimbursement Salary Outsource Div. Direct Sales
790   24-Feb-23    MANDIRI       1220011559559   Periode Jan 2023 dan Insentif Periode Des 2022            171,421,529    170,286,287     1,387,518       252,276       171,421,529
                                                 MULTI USAHA SEJAHTERA BERSAMA, PT,
                                                 Reimbursement Salary Outsource Div. Direct Sales
791   24-Feb-23    MANDIRI       1220011559559   Periode Jan 2023 dan Insentif Periode Des 2022          1,041,134,426   1,034,243,846    8,421,821     1,531,241      1,041,134,426
                                                 NICO CENTRAL, PT, Biaya atas Pemakaian Listrik di
792   24-Feb-23    MANDIRI       1220011559559   Gedung Sona Topas Tower Periode Jan 2023                     363,145         359,550       39,550         35,955           363,145
                                                 PENGELOLA MASPION PLAZA GUNUNG SAHARI,
                                                 Biaya atas Pemakaian Listrik di Gedung Maspion
793   24-Feb-23    MANDIRI       1220011559559   Plaza Lt. 5A periode Januari 2023                            189,304         210,337           -          21,033           189,304
                                                 PERHIMPUNAN PEMILIK DAN PENGHUNI SATUAN
                                                 RUMAH RUSUN SPAZIO, Biaya atas Pemakaian Listrik
                                                 & Admin di Rusun Spazio periode 21 December 2022 -
794   24-Feb-23    MANDIRI       1220011559559   20 Januari 2023                                              146,603         133,518       13,352           267            146,603

                                                 PERHIMPUNAN PENGHUNI GEDUNG PERKANTORAN
                                                 KIRANA TWO, Biaya atas Pemakaian Listrik di Gedung
795   24-Feb-23    MANDIRI       1220011559559   Kirana Two periode 20 Dec 2022 - 21 Jan 2023                 684,513         760,570           -          76,057           684,513
                                                 PERHIMPUNAN PENGHUNI WISMA STACO, Biaya
                                                 atas Pemakaian Listrik di Wisma Staco periode Jan
796   24-Feb-23    MANDIRI       1220011559559   2023                                                         133,350         148,166           -          14,816           133,350
                                                 PLN PERSERO, PT, Pengajuan Token Pulsa Listrik
797   24-Feb-23    MANDIRI       1220011559559   Phase 02 Region Jabotabek Periode Februari 2023           227,595,500    227,595,500           -             -         227,595,500
                                                 PPPSRS SEMENTARA PERKANTORAN EKSEKUTIF
                                                 SATRIO TOWER, Biaya atas Pemakaian Listrik di
798   24-Feb-23    MANDIRI       1220011559559   Gedung Satrio Tower periode Januari 2023                     215,184         213,054       23,435         21,305           215,184
                                                 PUALAM KENCANA GEMILANG JAKARTA, PT, Sewa
                                                 Penempatan Perangkat di Gedung Perwata Tower
799   24-Feb-23    MANDIRI       1220011559559   periode 14 Des 2022 - 13 Des 2023                          30,300,000     30,000,000     3,300,000     3,000,000        30,300,000
                                                 PURIAMPERA INTIPRATAMA, PT, Biaya atas
                                                 Pemakaian Listrik di Gedung Ad Premier Periode Jan
800   24-Feb-23    MANDIRI       1220011559559   2023                                                         254,233         251,716       27,688         25,171           254,233
                                                 SAINATH REALINDO, PT, Biaya atas Pemakaian Listrik
801   24-Feb-23    MANDIRI       1220011559559   di Gedung Sainath Tower periode Jan 2023                       72,883         80,981           -           8,098            72,883
                                                 SENAYAN TRIKARYA SEMPANA, PT, Biaya Pemakaian
                                                 Listrik di Plaza Senayan periode 28 Nov 2022 - 28 Dec
802   24-Feb-23    MANDIRI       1220011559559   2022                                                         489,930         485,080       53,358         48,508           489,930
                                                 SERPONG CIPTA KREASI, PT, Biaya atas Pemakaian
                                                 Listrik di Plaza Summarecon Serpong periode Jan
803   24-Feb-23    MANDIRI       1220011559559   2023                                                         994,666         984,817      108,330         98,481           994,666
                                                 SMART MILENIUM EFFISIENSI, PT, Biaya Pemakaian
                                                 Pulsa Telepon Pelanggan Corporate periode Des
804   24-Feb-23    MANDIRI       1220011559559   2022                                                        2,018,280      1,818,271      200,009            -            2,018,280
                                                 SUGIH BERKAT, PT, Biaya atas Pemakaian Listrik di
                                                 Gedung Menara Citicon periode 27 Desember 2022 -
805   24-Feb-23    MANDIRI       1220011559559   27 Januari 2023                                              707,000         700,000       77,000         70,000           707,000

                                                 TRIMITRA PUTRA MANDIRI, PT, Reimbursement
806   24-Feb-23    MANDIRI       1220011559559   Insentif Outsource Div. Direct Sales Periode Des 2022      24,505,361     24,343,074      198,351         36,064        24,505,361

                                                 TRIMITRA PUTRA MANDIRI, PT, Reimbursement
807   24-Feb-23    MANDIRI       1220011559559   Insentif Outsource Div. Direct Sales Periode Des 2022     123,679,872    122,860,800     1,001,088       182,016       123,679,872
                                                 WIJAYA KARYA REALTY, PT, Biaya atas Pemakaian
                                                 Listrik di Gedung Tamansari Parama Periode 01
808   24-Feb-23    MANDIRI       1220011559559   Januari 2023 - 31 Januari 2023                              1,206,697      1,231,323           -          24,626          1,206,697
                                                 BIBIT, Mr, Biaya Perbaikan FO Cut Link BLL_08
809   27-Feb-23   SINARMAS        00002999994    Beratan to BLL_01 Pemaron Tukad Mungga                      2,328,873      2,400,900           -          72,027          2,328,873
                                                 BIBIT, Mr, Biaya Pekerjaan Perbaikan FO Cut Link
810   27-Feb-23   SINARMAS        00002999994    Aksess M_05 Benesari Street                                 1,164,000      1,200,000           -          36,000          1,164,000
                                                 BIBIT, Mr, Biaya Pekerjaan Perbaikan FO Cut
                                                 Protection Link SF Gadjah Mada to SF Monang -
811   27-Feb-23   SINARMAS        00002999994    Maning                                                      1,107,837      1,142,100           -          34,263          1,107,837
                                                 MORA TELEMATIKA INDONESIA, PT, Biaya Sewa Dark
                                                 Core FO dari MTI Graha 9 ke NDC Jatinegara periode
812   02-Mar-23    MANDIRI       1220011559559   26.10.2022 - 25.11.2022                                     8,011,500      7,350,000      808,500        147,000          8,011,500
                                                 MORA TELEMATIKA INDONESIA, PT, Biaya Sewa Dark
                                                 Core FO dari MTI Graha 9 ke NDC Jatinegara periode
813   02-Mar-23    MANDIRI       1220011559559   26.09.2022 - 25.10.2022                                     8,011,500      7,350,000      808,500        147,000          8,011,500
                                                 SMARTFREN TELECOM TBK, PT, Internet Bandwith 15
814   02-Mar-23    MANDIRI       1220011559559   site @50 Mbps (I: 8000001063)                             441,450,000    405,000,000    44,550,000     8,100,000        441,450,000
                                                 SMARTFREN TELECOM TBK, PT, Internet Bandwith 5
815   02-Mar-23    MANDIRI       1220011559559   site @50 Mbps (I: 8000001062)                             147,150,000    135,000,000    14,850,000     2,700,000        147,150,000
                                                 SMARTFREN TELECOM TBK, PT, Internet Bandwith 27
816   02-Mar-23    MANDIRI       1220011559559   site @50 Mbps (I: 8000001068)                             794,610,000    729,000,000    80,190,000    14,580,000        794,610,000
                                                 TIRTA INDORAYA LOGISTICS, PT, Biaya Pengiriman
                                                 Material Battery Lithium 80 AH Narada dari PT Kado
817   02-Mar-23    MANDIRI       1220011559559   Global Indo Makmur ke WH Serpong                            3,052,000      2,800,000      308,000         56,000          3,052,000
                                                 TIRTA INDORAYA LOGISTICS, PT, Biaya Pengiriman
                                                 Material Subduct HDPE 40/34 dari PT Alpha Cikupa
818   02-Mar-23    MANDIRI       1220011559559   Makmur ke WH Serpong                                        1,128,150      1,035,000      113,850         20,700          1,128,150
                                                 TIRTA INDORAYA LOGISTICS, PT, Biaya Pengiriman
                                                 Material Kabel Duct 32 Core dari WH Serpong ke PT
819   02-Mar-23    MANDIRI       1220011559559   Simetrik Integrasi                                          1,128,150      1,035,000      113,850         20,700          1,128,150
                                                 TIRTA INDORAYA LOGISTICS, PT, Biaya Pengiriman
                                                 Material ONT dari WH Serpong ke WH Cipulir, Ruko
820   02-Mar-23    MANDIRI       1220011559559   Green Mansion dan WH Matraman                               1,580,500      1,450,000      159,500         29,000          1,580,500
                                                 TIRTA INDORAYA LOGISTICS, PT, Biaya Pengiriman
                                                 Material Cable Optical Drop SM 1 Core dari PT
821   02-Mar-23    MANDIRI       1220011559559   Furukawa ke WH Serpong                                      2,398,000      2,200,000      242,000         44,000          2,398,000
Page 64
      TANGGAL
    PENGELUARAN                 NOMOR REKENING
       DI BANK  REKENING BANK     BANK YANG                                                            NILAI MUTASI                 NILAI YANG DIBAYARKAN
NO.  STATEMENT YANG DIGUNAKAN     DIGUNAKAN                NAMA VENDOR DAN KETERANGAN                     BANK         DPP          PPN             PPh       NET DIBAYARKAN
                                                 WAHANARIA CEMERLANG, PT, Biaya Listrik di Hotel
                                                 Ibis Styles Yogyakarta Lantai 6 site Sosromenduran
822   02-Mar-23      MANDIRI     1220011559559   002 periode Januari 2023                                  2,804,602    3,116,224        -          311,622         2,804,602
                                                 BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
                                                 Perbaikan Tiang FO Miring dan Kabel FO Landai site
823   02-Mar-23      MANDIRI     1220011559559   Roa Malaka-005                                            2,136,954    2,191,747        -           54,793         2,136,954

                                                 BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
                                                 Pemindahan Tiang yang Menghalangi Pembangunan
824   02-Mar-23      MANDIRI     1220011559559   Rumah Area Bintara Jaya site MP Pondok Kelapa-001         1,506,714    1,545,347        -           38,633         1,506,714
         02-Mar-23                               CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
825                  MANDIRI     1220011559559   Material ONT dari WH Serpong ke WH Matraman                495,500      500,000       5,500         10,000           495,500
        02-Mar-23                                CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                 Material Meja dan Kursi Kerja dari Kantor Wisma
826                  MANDIRI     1220011559559   Keiai ke Kantor Bali                                      7,333,400    7,400,000     81,400        148,000         7,333,400
        02-Mar-23                                CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                 Material Nut Bolt, MCP 21M, Bracket CCTV dari PT
827                  MANDIRI     1220011559559   Konstruksi Baja Cikande ke WH Serpong                     1,025,685    1,035,000     11,385         20,700         1,025,685
        02-Mar-23                                CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                 Material Cable Optical SM ADSS 24 Core dari PT
828                  MANDIRI     1220011559559   Prysmian Cable ke WH Bali                                12,734,350   12,850,000    141,350        257,000        12,734,350
        02-Mar-23                                CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                 Material Foundation, MP 30M, Nut Bolt dari PT DHJ
829                  MANDIRI     1220011559559   ke WH Bali                                                7,036,100    7,100,000     78,100        142,000         7,036,100
        02-Mar-23                                CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                 Material Tiang 7M dari PT DHJ ke PT Kaliabang Jaya
830                  MANDIRI     1220011559559   Pratama                                                   9,067,650    9,150,000    100,650        183,000         9,067,650
        02-Mar-23                                CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                 Material Return MW ex. Dismantle dari PT Citra
831                  MANDIRI     1220011559559   Teknik Nusantara ke WH Serpong                             594,600      600,000       6,600         12,000           594,600
        02-Mar-23                                CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                 Material Kabel Duct 32 Core dari WH Serpong ke PT
832                  MANDIRI     1220011559559   Santa Multi Semesta                                        495,500      500,000       5,500         10,000           495,500
        02-Mar-23                                CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                 Material Cable ADSS dan Duct 32 Core dari WH
833                  MANDIRI     1220011559559   Serpong ke PT Kaliabang Jaya Pratama                       495,500      500,000       5,500         10,000           495,500
        02-Mar-23                                CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                 Material Cable ADSS 24 Core dari WH Serpong ke PT
834                  MANDIRI     1220011559559   Quadra Indonesia Utama                                     495,500      500,000       5,500         10,000           495,500
        02-Mar-23                                CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                 Material Cable ADSS 32 Core dari WH Serpong ke PT
835                  MANDIRI     1220011559559   Pandetel Utama Mandiri                                     495,500      500,000       5,500         10,000           495,500
        02-Mar-23                                CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                 Material Cable Optical AM 1 Core dari WH Serpong
836                  MANDIRI     1220011559559   ke Office Matraman                                         495,500      500,000       5,500         10,000           495,500
        02-Mar-23                                CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                 Material Cable ADSS 48 Core dari PT Prysmian Cable
837                  MANDIRI     1220011559559   ke WH Matraman                                             594,600      600,000       6,600         12,000           594,600
        02-Mar-23                                CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                 Material Battery Lithium 48V dari WH Serpong ke
838                  MANDIRI     1220011559559   WH Matraman                                                495,500      500,000       5,500         10,000           495,500

                                                 BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
                                                 Penarikan Kabel FO Cut Impact Tertabrak Truck site
839   02-Mar-23      MANDIRI     1220011559559   Diskominfo AP RW11, Jati, Pulo Gadung                     2,032,434    2,084,547        -           52,113         2,032,434

                                                 BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
                                                 Penarikan Kabel FO Cut Impact Tertabrak Truck site
840   02-Mar-23      MANDIRI     1220011559559   Rumah Pompa Baru Jl. H RW08                               1,526,994    1,566,147        -           39,153         1,526,994

                                                 BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
                                                 Penarikan Kabel FO Cut Impact Kabel Sobek site
841   02-Mar-23      MANDIRI     1220011559559   Rumah Pompa RW08 Kedaung Kali Angke                       1,346,034    1,380,547        -           34,513         1,346,034

                                                 BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
                                                 Penarikan Kabel FO Cut Impact Tertabrak Truck site
842   02-Mar-23      MANDIRI     1220011559559   Diskominfo AP RW02, Rawa Badak Utara, Koja, Jak-ut        1,818,714    1,865,347        -           46,633         1,818,714
                                                 BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
                                                 Penarikan Kabel FO Cut Impact Tertabrak Truck site
843   02-Mar-23      MANDIRI     1220011559559   PT Nico Central (Sona Topas)                              2,022,294    2,074,147        -           51,853         2,022,294
                                                 BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
                                                 Penarikan Kabel FO Cut Impact Tertabrak Truck site
844   02-Mar-23      MANDIRI     1220011559559   MP Cipedak-001                                            1,741,494    1,786,147        -           44,653         1,741,494

                                                 BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
                                                 Penarikan Kabel FO Cut Impact Tertabrak Truck site
845   02-Mar-23      MANDIRI     1220011559559   MP Cipinang Besar Selatan-002                             1,672,854    1,715,747        -           42,893         1,672,854
                                                 BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
                                                 Penarikan Kabel FO Cut Impact Tertabrak Kendaraan
846   02-Mar-23      MANDIRI     1220011559559   site MP Marga Mulya-001                                   1,807,794    1,854,147        -           46,353         1,807,794
                                                 BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
                                                 Penarikan Kabel FO Cut Impact Pembangunan Jalan
847   02-Mar-23      MANDIRI     1220011559559   Toll site MP Cipedak-001                                  2,380,314    2,441,347        -           61,033         2,380,314
                                                 BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
                                                 Penarikan Kabel FO Cut Impact terbakar Konsleting
848   02-Mar-23      MANDIRI     1220011559559   site MP Manggarai Selatan-001                             1,902,954    1,951,747        -           48,793         1,902,954
                                                 BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
                                                 Penarikan Kabel FO Cut Impact Kabel tertarik
849   02-Mar-23      MANDIRI     1220011559559   kendaraan site MP Pondok Pinang-001                       1,776,594    1,822,147        -           45,553         1,776,594
                                                 BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
                                                 Penarikan Kabel FO Cut Impact Kabel Tertabrak Bus
850   02-Mar-23      MANDIRI     1220011559559   site MP Ciracas-001                                       1,672,854    1,715,747        -           42,893         1,672,854
                                                 BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
                                                 Penarikan Kabel FO Cut Impact Kabel Tertarik Karena
851   02-Mar-23      MANDIRI     1220011559559   Tiang dicabut site Rawa Barat-001                         1,818,714    1,865,347        -           46,633         1,818,714
Page 65
      TANGGAL
    PENGELUARAN                     NOMOR REKENING
       DI BANK  REKENING BANK         BANK YANG                                                            NILAI MUTASI                  NILAI YANG DIBAYARKAN
NO.  STATEMENT YANG DIGUNAKAN         DIGUNAKAN               NAMA VENDOR DAN KETERANGAN                      BANK          DPP          PPN             PPh       NET DIBAYARKAN
                                                     PENGEMBANGAN PARIWISATA INDONESIA, PT,
                                                     Tagihan Kompensasi Persentase Revenue Sharing
                                                     Triwulan IV/2021 Periode 01 Oktober - Desember
852   03-Mar-23        MANDIRI       1220011559559   2021                                                     75,683,946    74,934,600   8,242,806     7,493,460        75,683,946
                                                     BALI UTAMA CAKRAWALA, PT, Biaya Promotion Levy
                                                     Sewa Unit di LG 2 seluas 22 m2 di Discovery
853   03-Mar-23        MANDIRI       1220011559559   Shopping Mall periode 01 Jan 2023 - 31 Mar 2023            333,300       330,000      36,300         33,000           333,300
                                                     BALI UTAMA CAKRAWALA, PT, Biaya Service Charge
                                                     Sewa Unit di LG 2 seluas 22 m2 di Discovery
854   03-Mar-23        MANDIRI       1220011559559   Shopping Mall periode 01 Jan 2023 - 31 Mar 2023           8,332,500     8,250,000    907,500        825,000          8,332,500
                                                     CHINA MOBILE INTERNATIONAL LTD, IP Transit
855   03-Mar-23      SINARMAS USD     0000670707     Equinix SG 50Mbps Periode Des 2022                        9,901,924     9,901,924         -             -            9,901,924
                                                     CHINA MOBILE INTERNATIONAL LTD, IP Transit
856   03-Mar-23      SINARMAS USD     0000670707     Equinix SG 20Mbps Periode Des 2022                        7,137,890     7,137,890         -             -            7,137,890
                                                     EQUINIX SINGAPORE PTE LTD, Biaya Sewa Rack
                                                     Colocation dan Interkoneksi Equinix Singapore
857   03-Mar-23       SINARMAS        0000240408     periode Jan 2023                                        109,575,388   109,575,388         -             -          109,575,388
                                                     FIBER NETWORKS INDONESIA, PT, Sewa Local Loop
                                                     30 Mbps - Pergudangan Puninar Yusen Periode Jan
858   03-Mar-23          BCA          3193058058     2023                                                      4,360,000     4,000,000    440,000         80,000          4,360,000
                                                     INTI ALGORITMA PERDANA, PT, Tagihan
                                                     Management Fee atas Profit Sharing periode Juli -
859   03-Mar-23        MANDIRI       1220011559559   September 2022 di Gedung South Quarter                   73,996,843    67,887,012   7,467,571     1,357,740         73,996,843
                                                     INTI ALGORITMA PERDANA, PT, Tagihan
                                                     Management Fee atas Profit Sharing periode April -
860   03-Mar-23        MANDIRI       1220011559559   Juni 2022 di Gedung South Quarter                        66,444,953    60,958,672   6,705,454     1,219,173         66,444,953
                                                     JALA LINTAS MEDIA, PT, Crossconnect Jala Lintas
                                                     Media Local Loop Cyber APJII to BSD Taman Tekno
861   03-Mar-23        MANDIRI       1220011559559   25 Mbps periode Jan 2023                                  7,085,000     6,500,000    715,000        130,000          7,085,000
                                                     POWER TELECOM, PT, Sewa Dark Fiber Segmen 11
                                                     (2.037KM) dan (2.038KM) Tegal Gundil-010 - Tanah
                                                     Sareal-005, Section 10 (2.830KM) & (2.831KM)
862   03-Mar-23          BCA          3193058058     Narasoma - Tanah Sareal-005 periode Feb 2023              3,714,284     3,407,600    374,836         68,152          3,714,284
                                                     POWER TELECOM, PT, Biaya Sewa Dark Fiber Section
                                                     26 2.270KM Cikaret-001 - Pasir Jaya-001 periode Feb
863   03-Mar-23          BCA          3193058058     2023                                                      1,732,010     1,589,000    174,790         31,780          1,732,010
                                                     POWER TELECOM, PT, Biaya Sewa Dark Fiber 2core
                                                     segmen HH Jl. Raya Serpong - HH Apartement
864   03-Mar-23          BCA          3193058058     Amazana Residence periode Feb 2023                        6,356,880     5,832,000    641,520        116,640          6,356,880
                                                     POWER TELECOM, PT, Biaya Sewa Dark Fiber 4core
                                                     segmen Mall Karawang - Karawang Regency periode
865   03-Mar-23          BCA          3193058058     Feb 2023                                                  9,679,200     8,880,000    976,800        177,600          9,679,200
                                                     POWER TELECOM, PT, Biaya Sewa Dark Fiber Section
                                                     25 3.965KM Pasirjaya-001 - Paledang-001 periode
866   03-Mar-23          BCA          3193058058     Feb 2023                                                  3,025,295     2,775,500    305,305         55,510          3,025,295
                                                     POWER TELECOM, PT, Sewa Dark Fiber Section 29
                                                     1.359KM Tanah Baru-007 - Tegalgundil-010 periode
867   03-Mar-23          BCA          3193058058     Feb 2023                                                  1,036,154      950,600     104,566         19,012          1,036,154
                                                     TEKNOVATUS SOLUSI SEJAHTERA, PT, Biaya Sewa
                                                     MMR Switch ISP to Rack Bali Tower Periode 01 - 31
868   03-Mar-23        MANDIRI       1220011559559   Jan 2023                                                   635,834       583,333      64,167         11,666           635,834
                                                     TEKNOVATUS SOLUSI SEJAHTERA, PT, Sewa
                                                     Colocation Rack & MMR Connect untuk Tenant PT
                                                     Wirecard Technologies Indonesia periode 01 - 31 Jan
869   03-Mar-23        MANDIRI       1220011559559   2023                                                      6,022,250     5,525,000    607,750        110,500          6,022,250

                                                     TELEKOMUNIKASI SELULAR, PT, Biaya Paket Data
870   03-Mar-23        MANDIRI       1220011559559   Mikrotik Regional Jawa Timur Periode Februari 2023         582,750       525,000      57,750            -             582,750
                                                     TELIA CARRIER SINGAPORE PTE LTD, Biaya Sewa Telia
871   03-Mar-23      SINARMAS USD     0000670707     IP Transit 3Gbps Periode Jan 2023                        36,448,800    36,448,800         -             -           36,448,800
                                                     TOWER OPERATION, Uang Muka Beban Umum atas
                                                     FPU Biaya Migrasi&Upgrade KWH Prabayar ke
872   03-Mar-23        MANDIRI       1220011559559   Pascabayar 1 Site 702739 Meruya Utara-025 - Trf           4,468,200     4,468,200         -             -            4,468,200
         03-Mar-23                                   CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                     Material Kabel ADSS 32 Core dari WH Serpong ke PT
873                    MANDIRI       1220011559559   Quadra Indonesia Utama                                     495,500       500,000       5,500         10,000           495,500
        03-Mar-23                                    CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                     Material Sofa, Kursi & Meja dari Kantor Wisma Keiai
874                    MANDIRI       1220011559559   ke Kantor Batu Ceper                                      1,620,285     1,635,000     17,985         32,700          1,620,285
                                                     SANTA MULTI SEMESTA, PT, Tagihan 100% atas
                                                     Pekerjaan Penarikan Kabel FO Cut Impact dari kabel
                                                     Landai site Diskominfo AP RW07 Penggilingan,
875   03-Mar-23        MANDIRI       1220011559559   Cakung, Jaktim                                            2,726,023     2,547,685    280,245        101,907          2,726,023
                                                     SANTA MULTI SEMESTA, PT, Tagihan 100% atas
                                                     Pekerjaan Penarikan Kabel FO Cut Impact Kabel
                                                     Landai site Diskominfo AP RW06, kedaung Kaliangke,
876   03-Mar-23        MANDIRI       1220011559559   Cengkareng Jakbar                                         3,215,013     3,004,685    330,515        120,187          3,215,013
                                                     SANTA MULTI SEMESTA, PT, Tagihan 100% atas
                                                     Pekerjaan Relokasi Tiang Jakwifi Diskominfo AP
877   03-Mar-23        MANDIRI       1220011559559   RW03 Rawa Badak Utara, Koja, Jakut Batch-II               3,126,282     2,921,759    321,393        116,870          3,126,282
                                                     SANTA MULTI SEMESTA, PT, Tagihan 100% atas
                                                     Pekerjaan Relokasi Pole 18 Jakwifi Diskominfo AP
878   03-Mar-23        MANDIRI       1220011559559   RW11, Pela Mampang, Mampang Prapatan, Jaksel              3,434,548     3,209,858    353,084        128,394          3,434,548
                                                     SANTA MULTI SEMESTA, PT, Tagihan 100% atas
                                                     Pekerjaan Relokasi Tiang Jakwifi Diskominfo AP
879   03-Mar-23        MANDIRI       1220011559559   RW02 Krukut Taman Sari Jakbar                             2,957,221     2,763,758    304,013        110,550          2,957,221
                                                     SANTA MULTI SEMESTA, PT, Tagihan 100% atas
                                                     Pekerjaan Penarikan Kabel FO Cut Impact Hit by
880   03-Mar-23        MANDIRI       1220011559559   Truck site MP Cibubur-001                                 1,846,482     1,725,684    189,825         69,027          1,846,482
                                                     SANTA MULTI SEMESTA, PT, Tagihan 100% atas
                                                     Pekerjaan Penarikan FO Cut Ducting Impact Proyek
881   03-Mar-23        MANDIRI       1220011559559   SDA Site MP-Gambir-001                                    9,582,582     8,955,684    985,125        358,227          9,582,582
                                                     SANTA MULTI SEMESTA, PT, Tagihan 100% atas
                                                     Pekerjaan Penarikan Kabel FO Cut Impact Hit by
882   03-Mar-23        MANDIRI       1220011559559   Truck Site Pegangsaan Dua-075                             3,251,392     3,038,684    334,255        121,547          3,251,392
Page 66
      TANGGAL
    PENGELUARAN                 NOMOR REKENING
       DI BANK  REKENING BANK     BANK YANG                                                            NILAI MUTASI                 NILAI YANG DIBAYARKAN
NO.  STATEMENT YANG DIGUNAKAN     DIGUNAKAN               NAMA VENDOR DAN KETERANGAN                      BANK         DPP          PPN             PPh       NET DIBAYARKAN
                                                 SANTA MULTI SEMESTA, PT, Tagihan 100% atas
                                                 Pekerjaan Penarikan Kabel FO Cut Crossing Impact
883   03-Mar-23    MANDIRI       1220011559559   Hit by Truck Site MP-Kedaung Kali Angke-001               3,797,734    3,549,284    390,421        141,971         3,797,734
                                                 SANTA MULTI SEMESTA, PT, Tagihan 100% atas
                                                 Pekerjaan Penarikan FO Cut Ducting Impact HDPE
884   03-Mar-23    MANDIRI       1220011559559   Site Curug-006                                            5,878,242    5,493,684    604,305        219,747         5,878,242
                                                 SANTA MULTI SEMESTA, PT, Tagihan 100% atas
                                                 Pekerjaan Penarikan Kabel FO Cut Impact Kabel
885   03-Mar-23    MANDIRI       1220011559559   Terbakar site Pela Mampang-002                            2,333,332    2,180,684    239,875         87,227         2,333,332
                                                 DITJEN POSTEL, BHP Frekuensi Radio Periode 10 Mar
                                                 2023 s.d 09 Mar 2024 - No. Aplikasi :
886   06-Mar-23    MANDIRI       1220011559559   02336071032021                                            9,892,281    9,892,281         -             -           9,892,281
                                                 DITJEN POSTEL, BHP Frekuensi Radio Periode 10 Mar
                                                 2023 s.d 09 Mar 2024 - No. Aplikasi :
887   06-Mar-23    MANDIRI       1220011559559   02336070032021                                            9,892,281    9,892,281         -             -           9,892,281
                                                 DITJEN POSTEL, BHP Frekuensi Radio Periode 10 Mar
                                                 2023 s.d 09 Mar 2024 - No. Aplikasi :
888   06-Mar-23    MANDIRI       1220011559559   02336069032021                                            9,892,281    9,892,281         -             -           9,892,281
                                                 DITJEN POSTEL, BHP Frekuensi Radio Periode 10 Mar
                                                 2023 s.d 09 Mar 2024 - No. Aplikasi :
889   06-Mar-23    MANDIRI       1220011559559   02336068032021                                            9,892,281    9,892,281         -             -           9,892,281
                                                 DITJEN POSTEL, BHP Frekuensi Radio Periode 10 Mar
                                                 2023 s.d 09 Mar 2024 - No. Aplikasi :
890   06-Mar-23    MANDIRI       1220011559559   02335932032021                                            7,050,966    7,050,966         -             -           7,050,966
                                                 DITJEN POSTEL, BHP Frekuensi Radio Periode 10 Mar
                                                 2023 s.d 09 Mar 2024 - No. Aplikasi :
891   06-Mar-23    MANDIRI       1220011559559   02335931032021                                            7,050,966    7,050,966         -             -           7,050,966
                                                 DITJEN POSTEL, BHP Frekuensi Radio Periode 10 Mar
                                                 2023 s.d 09 Mar 2024 - No. Aplikasi :
892   06-Mar-23    MANDIRI       1220011559559   02335940032021                                            9,892,281    9,892,281         -             -           9,892,281
                                                 DITJEN POSTEL, BHP Frekuensi Radio Periode 10 Mar
                                                 2023 s.d 09 Mar 2024 - No. Aplikasi :
893   06-Mar-23    MANDIRI       1220011559559   02335939032021                                            9,892,281    9,892,281         -             -           9,892,281
                                                 DITJEN POSTEL, BHP Frekuensi Radio Periode 10 Mar
                                                 2023 s.d 09 Mar 2024 - No. Aplikasi :
894   06-Mar-23    MANDIRI       1220011559559   02335938032021                                            9,892,281    9,892,281         -             -           9,892,281
                                                 DITJEN POSTEL, BHP Frekuensi Radio Periode 10 Mar
                                                 2023 s.d 09 Mar 2024 - No. Aplikasi :
895   06-Mar-23    MANDIRI       1220011559559   02335937032021                                            9,892,281    9,892,281         -             -           9,892,281
                                                 DITJEN POSTEL, BHP Frekuensi Radio Periode 10 Mar
                                                 2023 s.d 09 Mar 2024 - No. Aplikasi :
896   06-Mar-23    MANDIRI       1220011559559   02335936032021                                            7,102,692    7,102,692         -             -           7,102,692
                                                 DITJEN POSTEL, BHP Frekuensi Radio Periode 10 Mar
                                                 2023 s.d 09 Mar 2024 - No. Aplikasi :
897   06-Mar-23    MANDIRI       1220011559559   02335832032021                                            7,077,295    7,077,295         -             -           7,077,295
                                                 DITJEN POSTEL, BHP Frekuensi Radio Periode 10 Mar
                                                 2023 s.d 09 Mar 2024 - No. Aplikasi :
898   06-Mar-23    MANDIRI       1220011559559   02335831032021                                            7,077,295    7,077,295         -             -           7,077,295
                                                 DITJEN POSTEL, BHP Frekuensi Radio Periode 10 Mar
                                                 2023 s.d 09 Mar 2024 - No. Aplikasi :
899   06-Mar-23    MANDIRI       1220011559559   02335830032021                                            9,900,574    9,900,574         -             -           9,900,574
                                                 DITJEN POSTEL, BHP Frekuensi Radio Periode 10 Mar
                                                 2023 s.d 09 Mar 2024 - No. Aplikasi :
900   06-Mar-23    MANDIRI       1220011559559   02335829032021                                            9,900,574    9,900,574         -             -           9,900,574
                                                 DITJEN POSTEL, BHP Frekuensi Radio Periode 10 Mar
                                                 2023 s.d 09 Mar 2024 - No. Aplikasi :
901   06-Mar-23    MANDIRI       1220011559559   02335834032021                                            9,900,574    9,900,574         -             -           9,900,574
                                                 APLIKANUSA LINTASARTA, PT, Sewa Crossconnect
                                                 Lintas Arta For IBM Indonesia - Collocation Rack
                                                 MMR, MMR UTP MRC 1, Meet Me Romm UTP
902   06-Mar-23    MANDIRI       1220011559559   Taman Tekno BSD periode Des 2022 - Feb 2023              26,160,000   24,000,000   2,640,000       480,000        26,160,000
                                                 DPO FPU, Biaya Material Project Jakwifi Dept. Gove
                                                 Ops untuk installasi Site klender RW 01 dan Klender
903   06-Mar-23    MANDIRI       1220011559559   RW 04                                                     1,453,500    1,453,500         -             -           1,453,500
                                                 MORA TELEMATIKA INDONESIA, PT, Biaya
                                                 Interkoneksi dari OTB BTS ke Rack BTS NDC
904   06-Mar-23    MANDIRI       1220011559559   Jatinegara periode 01.11.2022 - 30.11.2022                1,090,000    1,000,000    110,000         20,000         1,090,000
                                                 MORA TELEMATIKA INDONESIA, PT, Sewa Core FO
                                                 dari MP Pegangsaan Dua ke NDC Jatinegara periode
905   06-Mar-23    MANDIRI       1220011559559   13.09.2022 - 12.10.2022                                   4,578,000    4,200,000    462,000         84,000         4,578,000
                                                 MORA TELEMATIKA INDONESIA, PT, Biaya
                                                 Interkoneksi dari OTB BTS ke Rack BTS NDC
906   06-Mar-23    MANDIRI       1220011559559   Jatinegara periode 01.09.2022 - 30.09.2022                1,090,000    1,000,000    110,000         20,000         1,090,000
                                                 MORA TELEMATIKA INDONESIA, PT, Biaya Sewa Dark
                                                 Core FO dari MTI Graha 9 ke NDC Jatinegara periode
907   06-Mar-23    MANDIRI       1220011559559   26.11.2022 - 25.12.2022                                   8,011,500    7,350,000    808,500        147,000         8,011,500
                                                 MORA TELEMATIKA INDONESIA, PT, Sewa Core FO
                                                 dari MP Pegangsaan Dua ke NDC Jatinegara periode
908   06-Mar-23    MANDIRI       1220011559559   13.10.2022 - 12.11.2022                                   4,578,000    4,200,000    462,000         84,000         4,578,000
                                                 MORA TELEMATIKA INDONESIA, PT, Tagihan
                                                 Supernet IP Transit NDC Jatinegara 1 Gbps periode
909   06-Mar-23    MANDIRI       1220011559559   01.08.2022 - 24.08.2022                                  11,307,872   10,374,194   1,141,161       207,483        11,307,872
                                                 MORA TELEMATIKA INDONESIA, PT, Sewa Dark Core
                                                 MTI Asia Retail - POP BTS Karawang end to end
910   06-Mar-23    MANDIRI       1220011559559   periode 15.07.2022 - 17.07.2022                           7,254,653    6,655,644    732,121        133,112         7,254,653
                                                 MORA TELEMATIKA INDONESIA, PT, Sewa Core FO
                                                 IDC Duren Tiga ke NDC Jatinegara periode
911   06-Mar-23    MANDIRI       1220011559559   28.09.2022 - 27.10.2022                                   9,156,000    8,400,000    924,000        168,000         9,156,000
                                                 MORA TELEMATIKA INDONESIA, PT, Sewa Core FO
                                                 IDC Duren Tiga ke NDC Jatinegara periode
912   06-Mar-23    MANDIRI       1220011559559   28.10.2022 - 27.11.2022                                   9,156,000    8,400,000    924,000        168,000         9,156,000
                                                 MORA TELEMATIKA INDONESIA, PT, Sewa Core FO
                                                 dari MP Kampung Melayu ke NDC Jatinegara periode
913   06-Mar-23    MANDIRI       1220011559559   15.09.2022 - 14.10.2022                                   8,011,500    7,350,000    808,500        147,000         8,011,500
Page 67
      TANGGAL
    PENGELUARAN                 NOMOR REKENING
       DI BANK  REKENING BANK     BANK YANG                                                             NILAI MUTASI                 NILAI YANG DIBAYARKAN
NO.  STATEMENT YANG DIGUNAKAN     DIGUNAKAN              NAMA VENDOR DAN KETERANGAN                        BANK         DPP          PPN             PPh       NET DIBAYARKAN
                                                 MORA TELEMATIKA INDONESIA, PT, Sewa Core FO
                                                 dari MP Kampung Melayu ke NDC Jatinegara periode
914   06-Mar-23    MANDIRI       1220011559559   15.10.2022 - 14.11.2022                                    8,011,500    7,350,000    808,500        147,000         8,011,500
                                                 MORA TELEMATIKA INDONESIA, PT, Biaya
                                                 Interkoneksi dari OTB BTS ke Rack BTS NDC
915   06-Mar-23    MANDIRI       1220011559559   Jatinegara periode 01.10.2022 - 31.10.2022                 1,090,000    1,000,000    110,000         20,000         1,090,000
                                                 XL AXIATA TBK, PT, Biaya Tagihan Pasca Bayar
                                                 Pembelian Pulsa XL Mikrotik (Monitoring NOC)
                                                 Periode Januari 2023 (Pemakaian Desember 2022-
916   06-Mar-23    MANDIRI       1220011559559   Jabodetabek Area (10 Site)                                  999,000      900,000      99,000            -             999,000
                                                 PLN PERSERO, PT, Biaya Pembelian token PLN di 7
917   07-Mar-23   SINARMAS        00002999994    site KWH prabayar pemakaian bulan Maret 2023              11,037,500   11,037,500         -             -          11,037,500

                                                 LINK NET TBK, PT, Sewa Crossconnect 10 Mbps Fiber
918   07-Mar-23     BCA           3193058058     Optic Tenant PT. Bank Keb Hana periode Jan 2023            2,725,000    2,500,000    275,000         50,000         2,725,000
                                                 TOWER OPERATION, Uang Muka Beban Umum atas
                                                 FPU Biaya Normalisasi Pergantian Kwh Stolen (kwh
919   07-Mar-23    MANDIRI       1220011559559   AMR) Site 701478 Sunter Agung-023 - Trf                    5,149,650    5,149,650         -             -           5,149,650
                                                 BIBIT, Mr, Biaya Pekerjaan Perbaikan FO Cut Link
                                                 Aksess GNY_77 Samu Singapadu (TT I0201-002) Jl
                                                 Lod Tunduh ? Gianyar.(PO Rp.1.261.900,- Potongan
920   07-Mar-23   SINARMAS        00002999994    PPh 21(3%) Rp.37.857,- )                                   1,224,043    1,261,900         -          37,857         1,224,043
                                                 ARYAVENTURA REALTY, PT, Biaya atas Pemakaian
921   08-Mar-23    MANDIRI       1220011559559   Listrik di Gedung Aryaventura periode Jan 2023              191,831      189,932      20,892         18,993           191,831
                                                 BALI UTAMA CAKRAWALA, PT, Biaya Penempatan
                                                 Sewa Perangkat Telekomunikasi di Discovery
                                                 Shopping Mall berdasarkan Revenue Sharing periode
922   08-Mar-23    MANDIRI       1220011559559   Oktober - Desember 2022                                   12,670,287   12,544,838   1,379,932     1,254,483        12,670,287
                                                 BALI UTAMA CAKRAWALA, PT, Biaya atas Pemakaian
                                                 Listrik di Gedung Discovery Shopping Mall Periode 29
923   08-Mar-23    MANDIRI       1220011559559   Dec 2022 - 28 Jan 2023                                      191,488      189,594      20,853         18,959           191,488
                                                 CITRA KIRANA HIJAU RETAIL, PT, Biaya atas
                                                 Pemakaian Listrik di Gedung Green Sedayu Mall
924   08-Mar-23    MANDIRI       1220011559559   General 2 Lt.GF periode Jan 2023                            431,277      395,667      43,523          7,913           431,277
                                                 CITRA KIRANA HIJAU RETAIL, PT, Biaya atas
                                                 Pemakaian Listrik di Gedung Green Sedayu Mall
925   08-Mar-23    MANDIRI       1220011559559   General 1 BSM periode Jan 2023                                98,802      90,643       9,971          1,812            98,802
                                                 CITRA KIRANA HIJAU RETAIL, PT, Biaya atas
                                                 Pemakaian Listrik di Gedung Green Sedayu Mall
926   08-Mar-23    MANDIRI       1220011559559   General 3 Lt.1 periode Jan 2023                             393,924      361,397      39,754          7,227           393,924
                                                 CITRA KIRANA HIJAU RETAIL, PT, Biaya atas
                                                 Pemakaian Listrik di Gedung Green Sedayu Mall
927   08-Mar-23    MANDIRI       1220011559559   General 4 Lt.2 periode Jan 2023                             242,693      222,654      24,492          4,453           242,693
                                                 CYBER NETWORK INDONESIA, PT, Sewa Colocation
928   08-Mar-23    MANDIRI       1220011559559   Rack IU OTB (MMR) periode Feb 2023                         3,270,000    3,000,000    330,000         60,000         3,270,000
                                                 CYBER NETWORK INDONESIA, PT, Biaya Sewa
929   08-Mar-23    MANDIRI       1220011559559   Collocation OTB Nix Bali periode Feb 2023                  2,997,500    2,750,000    302,500         55,000         2,997,500
                                                 DANAMAS INSAN KREASI ANDALAN, PT,
                                                 Reimbursement Salary Outsource Div. Direct Sales
930   08-Mar-23    MANDIRI       1220011559559   Periode Jan 2023 dan Insentif Periode Des 2022            81,022,077   80,485,507    655,808        119,238        81,022,077
                                                 DATAMEDIA MAKMUR PRATAMA, PT, Biaya Layanan
                                                 Content TV 42 Channel untuk Tenant RS Atma Jaya
931   08-Mar-23    MANDIRI       1220011559559   Pluit periode Feb 2023                                    12,740,000   13,000,000         -         260,000        12,740,000
                                                 DONNELLY PARAMITA UTAMA, PT, Biaya atas
                                                 Pemakaian Listrik di Gedung Transavia Land/Graha
932   08-Mar-23    MANDIRI       1220011559559   Paramita periode Januari 2023                               305,498      302,473      33,272         30,247           305,498
                                                 FIBER NETWORKS INDONESIA, PT, Sewa Local Loop
                                                 30 Mbps - Pergudangan Puninar Yusen Periode Feb
933   08-Mar-23    MANDIRI       1220011559559   2023                                                       4,360,000    4,000,000    440,000         80,000         4,360,000
                                                 HIJAU TEDUH SAKA PERSADA, PT, Biaya atas
                                                 Pemakaian Listrik di Gedung Sastra Graha Periode 11
934   08-Mar-23    MANDIRI       1220011559559   Januari 2023 - 10 Februari 2023                             160,072      177,857          -          17,785           160,072
                                                 INDOKARYA SUKSES BERSAMA, PT, Biaya atas
                                                 Pemakaian Listrik di Apartemen Pluit Sea View
935   08-Mar-23    MANDIRI       1220011559559   Periode 25 Jan 2023 - 23 Feb 2023                          1,068,165    1,186,850         -         118,685         1,068,165
                                                 INFRA YES SOLUSINDO, PT, Biaya Open Booth dan
                                                 Penempatan Banner Balifiber di Apartement Green
936   08-Mar-23    MANDIRI       1220011559559   Pramuka City periode 15 Sept 2022 - 14 Jan 2023           17,640,000   18,000,000         -         360,000        17,640,000
                                                 INTILAND DEVELOPMENT TBK, PT (JAKARTA), Biaya
                                                 atas Pemakaian Listrik di Gedung Intiland Jakarta
937   08-Mar-23    MANDIRI       1220011559559   periode 26 Dec 2022 - 25 Jan 2023                           624,626      694,028          -          69,402           624,626

                                                 INTILAND DEVELOPMENT TBK, PT (SURABAYA), Sewa
                                                 Penempatan Perangkat Telekomunikasi Server MMR
938   08-Mar-23    MANDIRI       1220011559559   B1 di Gedung Intiland periode Jan 2023                     4,040,000    4,000,000    440,000        400,000         4,040,000

                                                 INTILAND DEVELOPMENT TBK, PT (SURABAYA), Sewa
                                                 Penempatan Perangkat Telekomunikasi Server MMR
939   08-Mar-23    MANDIRI       1220011559559   B1 di Gedung Intiland periode Feb 2023                     4,040,000    4,000,000    440,000        400,000         4,040,000
                                                 ISMAWA TRIMITRA, PT, Biaya atas Pemakaian Listrik
                                                 di Graha Iskandarsyah periode 20 Jan 2023 - 20 Feb
940   08-Mar-23    MANDIRI       1220011559559   2023                                                        155,115      153,578      16,894         15,357           155,115

                                                 JALA LINTAS MEDIA, PT, Sewa Local Loop 10Mbps
941   08-Mar-23    MANDIRI       1220011559559   IDC to PT Darya Varia Laboratoria periode Feb 2023         2,180,000    2,000,000    220,000         40,000         2,180,000
                                                 JALA LINTAS MEDIA, PT, Sewa Local Loop 10Mbps
942   08-Mar-23    MANDIRI       1220011559559   IDC to PT Darya Varia Laboratoria periode Jan 2023         2,180,000    2,000,000    220,000         40,000         2,180,000
                                                 JALA LINTAS MEDIA, PT, Sewa Local Loop 10 Mbps &
                                                 20 Mbps Tenant Citeureup dan Gunung Putri (VLAN)
943   08-Mar-23    MANDIRI       1220011559559   periode Jan 2023                                           9,265,000    8,500,000    935,000        170,000         9,265,000
                                                 JALA LINTAS MEDIA, PT, Crossconnect Jala Lintas
                                                 Media Local Loop Cyber APJII to BSD Taman Tekno
944   08-Mar-23    MANDIRI       1220011559559   25 Mbps periode Feb 2023                                   7,085,000    6,500,000    715,000        130,000         7,085,000
Page 68
      TANGGAL
    PENGELUARAN                 NOMOR REKENING
       DI BANK  REKENING BANK     BANK YANG                                                               NILAI MUTASI                 NILAI YANG DIBAYARKAN
NO.  STATEMENT YANG DIGUNAKAN     DIGUNAKAN                NAMA VENDOR DAN KETERANGAN                        BANK         DPP          PPN             PPh       NET DIBAYARKAN
                                                 KARYAGRAHA NUSANTARA, PT, Sewa Subduct FO
                                                 96core Handhole depan Gedung Cyber 1 to XL Lt.5
945   08-Mar-23    MANDIRI       1220011559559   periode 31 May 2022 - 30 May 2023                           35,350,000   35,000,000   3,850,000     3,500,000        35,350,000
                                                 LESTARI MAHADIBYA, PT, Biaya Kehandalan atas
                                                 Pemakaian Listrik di Summarecon Digital Centre
946   08-Mar-23    MANDIRI       1220011559559   (SDC) Serpong periode 11 Dec 2022 - 10 Jan 2023                 85,124      84,281       9,271          8,428            85,124
                                                 LESTARI MAHADIBYA, PT, Biaya Pemakaian Listrik di
                                                 Summarecon Digital Centre (SDC) Serpong periode
947   08-Mar-23    MANDIRI       1220011559559   11 Dec 2022 - 10 Jan 2023                                     294,724      291,805      32,099         29,180           294,724
                                                 LESTARI MAHADIBYA, PT, Biaya Kehandalan atas
                                                 Pemakaian Listrik di Summarecon Mal Serpong 1
948   08-Mar-23    MANDIRI       1220011559559   periode 11 Jan 2023 - 10 Feb 2023                             290,896      288,015      31,682         28,801           290,896
                                                 LESTARI MAHADIBYA, PT, Biaya Pemakaian Listrik di
                                                 Summarecon Mal Serpong 1 periode 11 Jan 2023 - 10
949   08-Mar-23    MANDIRI       1220011559559   Feb 2023                                                      738,536      731,223      80,435         73,122           738,536
                                                 MEDIA NUSANTARA DATA GLOBAL, PT, Sewa
                                                 Crossconnect Fiber Optic in Data Center CDCI - 1 Port
950   08-Mar-23    MANDIRI       1220011559559   REQ/21FEB19/00000008 periode Jan 2023                        1,635,000    1,635,000         -             -           1,635,000
                                                 MEDIA NUSANTARA DATA GLOBAL, PT, Sewa Full
951   08-Mar-23    MANDIRI       1220011559559   Rack Server Cabinet 45U periode Jan 2023                    10,900,000   10,000,000   1,100,000       200,000        10,900,000
                                                 MEDIA NUSANTARA DATA GLOBAL, PT, Biaya Sewa
952   08-Mar-23    MANDIRI       1220011559559   Penempatan OTB Fiber in NER periode Jan 2023                 2,180,000    2,000,000    220,000         40,000         2,180,000
                                                 MEKAR PRANA INDAH, PT, Biaya atas Pemakaian
953   08-Mar-23    MANDIRI       1220011559559   Listrik di Menara Bidakara 2 periode Jan 2022                 263,979      261,365      28,750         26,136           263,979
                                                 MENARA DUTA, PT, Biaya atas Pemakaian Listrik
954   08-Mar-23    MANDIRI       1220011559559   Menara Duta Periode Jan 2023                                  131,761      130,456      14,350         13,045           131,761
                                                 MENARA THAMRIN, PT, Sewa Penempatan
                                                 Perangkat di Gedung Menara Thamrin periode 20
955   08-Mar-23    MANDIRI       1220011559559   Feb 2023 - 19 Feb 2024                                      10,100,000   10,000,000   1,100,000     1,000,000        10,100,000
                                                 MENARA THAMRIN, PT, Biaya atas Pemakaian Listrik
                                                 di Gedung Menara Thamrin Suite 21 & 6 periode
956   08-Mar-23    MANDIRI       1220011559559   Januari 2023                                                  209,513      207,438      22,818         20,743           209,513
                                                 MOXCAL TEKNOLOGI, PT, Tagihan Sewa Modul
                                                 Aplikasi Call Center Centerix periode Feb 2023
957   08-Mar-23    MANDIRI       1220011559559   (Additional 10qty)                                          10,900,000   10,000,000   1,100,000       200,000        10,900,000
                                                 MOXCAL TEKNOLOGI, PT, Tagihan Sewa Modul
                                                 Aplikasi Call Center Centerix periode 17 Jan 2023 - 16
958   08-Mar-23    MANDIRI       1220011559559   Feb 2023 (Additional 10qty)                                 10,900,000   10,000,000   1,100,000       200,000        10,900,000
                                                 MOXCAL TEKNOLOGI, PT, Jasa Whatsapp Service API
959   08-Mar-23    MANDIRI       1220011559559   Client periode 15 Feb 2023 - 14 Mar 2023                      654,000      600,000      66,000         12,000           654,000
                                                 MOXCAL TEKNOLOGI, PT, Tagihan Sewa Modul
960   08-Mar-23    MANDIRI       1220011559559   Aplikasi Call Center Centerix periode Feb 2023              10,900,000   10,000,000   1,100,000       200,000        10,900,000
                                                 MOXCAL TEKNOLOGI, PT, Tagihan Sewa Modul
                                                 Aplikasi Call Center Centerix periode Feb 2023
961   08-Mar-23    MANDIRI       1220011559559   (Additional 5qty)                                            5,450,000    5,000,000    550,000        100,000         5,450,000
                                                 OMADATA PADMA INDONESIA, PT, Biaya Sewa
                                                 Management Cable MMR 1U Open Rack Periode Feb
962   08-Mar-23    MANDIRI       1220011559559   2023                                                         2,180,000    2,000,000    220,000         40,000         2,180,000
                                                 OMADATA PADMA INDONESIA, PT, Biaya Sewa
                                                 Management Cable - MMR 1U OTB Periode Feb 2023
963   08-Mar-23    MANDIRI       1220011559559   (Omadata)                                                    1,635,000    1,500,000    165,000         30,000         1,635,000

                                                 PERHIMPUNAN PENGHUNI GEDUNG PERKANTORAN
                                                 KIRANA TWO, Biaya atas Pemakaian Listrik di Gedung
964   08-Mar-23    MANDIRI       1220011559559   Kirana Two periode 21 Jan 2022 - 20 Feb 2023                  674,873      749,858          -          74,985           674,873
                                                 PERHIMPUNAN PENGHUNI MENARA KADIN
                                                 INDONESIA, Biaya atas Pemakaian Listrik di Gedung
965   08-Mar-23    MANDIRI       1220011559559   Menara Kadin periode Jan 2023                                 350,541      389,489          -          38,948           350,541
                                                 PETARUNG TANGGUH PERSADA, PT, Biaya atas
                                                 Pemakaian Listrik di Mal Bali Galeria periode Dec
966   08-Mar-23    MANDIRI       1220011559559   2022                                                          511,110      506,049      55,665         50,604           511,110
                                                 PETARUNG TANGGUH PERSADA, PT, Sewa
                                                 Penempatan Perangkat di Gedung Mall Bali Galeria
967   08-Mar-23    MANDIRI       1220011559559   periode 24 Agust 2022 - 23 Agust 2023                       15,150,000   15,000,000   1,650,000     1,500,000        15,150,000
                                                 PETARUNG TANGGUH PERSADA, PT, Biaya atas
                                                 Pemakaian Listrik di Mal Bali Galeria periode Jan
968   08-Mar-23    MANDIRI       1220011559559   2023                                                          588,152      582,328      64,056         58,232           588,152
                                                 POWER TELECOM, PT, Biaya Sewa Dark Fiber 2Core
                                                 Segmen Tangerang HH Plaza SumMarecon - HH
                                                 Teknovatus, HH Teknovatus - MP Pondok Pinang
969   08-Mar-23    MANDIRI       1220011559559   periode Feb 2023                                            20,118,626   18,457,455   2,030,320       369,149        20,118,626

                                                 POWER TELECOM, PT, Biaya Sewa Dark Fiber Section
                                                 20 (2.562KM) Kedungbadak-008 - Tanah sareal-005,
                                                 Section 12 (1.780KM) Kencana-001 - Tanah Sareal-
                                                 005, Section 16 (1KM) Tanah Sareal-002 - Tanah
970   08-Mar-23    MANDIRI       1220011559559   Sareal-005, Section 17 (6.090KM) periode Feb 2023           10,203,981    9,361,450   1,029,760       187,229        10,203,981
                                                 PPPSRS CBD PLUIT, Biaya atas Pemakaian Listrik CBD
971   08-Mar-23    MANDIRI       1220011559559   Pluit periode Februari 2023                                   316,296      316,296          -             -             316,296
                                                 PRABA KUMALA SAJATI, PT, Biaya Management Fee
                                                 atas Revenue Sharing periode September -
972   08-Mar-23    MANDIRI       1220011559559   Desember 2022 di Gedung Park23 Bali Mall                      795,375      787,500      86,625         78,750           795,375
                                                 PURIAMPERA INTIPRATAMA, PT, Biaya Sewa
                                                 Penempatan Perangkat Telekomunikasi di Gedung
                                                 Ad Premier Berdasarkan Profit Sharing periode
973   08-Mar-23    MANDIRI       1220011559559   Oktober - Desember 2022                                      6,120,600    6,060,000    666,600        606,000         6,120,600
                                                 RAJAWALI ADIWISMA, PT, Biaya atas Pemakaian
974   08-Mar-23    MANDIRI       1220011559559   Listrik di Menara Rajawali Periode Jan 2023                   185,973      184,132      20,254         18,413           185,973
                                                 SERPONG MAS TELEMATIKA, PT, Biaya Sewa Core FO
                                                 2 core HH Pos Polisi - German Center periode Des
975   08-Mar-23    MANDIRI       1220011559559   2022                                                         1,635,000    1,500,000    165,000         30,000         1,635,000
                                                 SUMMARECON AGUNG, PT, Biaya atas Pemakaian
976   08-Mar-23    MANDIRI       1220011559559   Listrik di The Springlake View periode Jan 2023               835,632      827,358      91,009         82,735           835,632
                                                 SUMMARECON AGUNG, PT, Biaya atas Pemakaian
977   08-Mar-23    MANDIRI       1220011559559   Listrik di The Springlake View periode Dec 2022               696,627      689,729      75,870         68,972           696,627
Page 69
      TANGGAL
    PENGELUARAN                  NOMOR REKENING
       DI BANK  REKENING BANK      BANK YANG                                                            NILAI MUTASI                 NILAI YANG DIBAYARKAN
NO.  STATEMENT YANG DIGUNAKAN      DIGUNAKAN                NAMA VENDOR DAN KETERANGAN                     BANK         DPP          PPN             PPh       NET DIBAYARKAN
                                                  SUMMARECON AGUNG, PT, Biaya atas Pemakaian
                                                  Listrik di The Springlake Apartement periode Jan
978    08-Mar-23      MANDIRI     1220011559559   2023                                                       529,294      524,053      57,646         52,405           529,294
                                                  SUMMARECON AGUNG, PT, Biaya atas Pemakaian
                                                  Listrik di The Springlake Apartement periode Dec
979    08-Mar-23      MANDIRI     1220011559559   2022                                                       529,294      524,053      57,646         52,405           529,294
                                                  TECHNOLOGY DATA INDONESIA, PT, Biaya Sewa Rack
                                                  Summer 243 IDC Duren Tiga (Colocation 1/2 Rack)
980    08-Mar-23      MANDIRI     1220011559559   Periode 1 s/d 31 Jan 2023                                 7,630,000    7,000,000    770,000        140,000         7,630,000
                                                  TEKNOVATUS SOLUSI SEJAHTERA, PT, Tagihan Sewa
                                                  Collocation Rack 47 U 19" periode Jan 2023 dan
981    08-Mar-23      MANDIRI     1220011559559   Kelebihan Pemakaian Listrik periode Des 2022             29,088,310   27,152,400   2,986,764     1,050,854        29,088,310
                                                  TOWER BERSAMA, PT, Sewa Local Loop Metro E 100
                                                  Mbps Kawasan Nusa Dua Bali (Tower Bersama
982    08-Mar-23      MANDIRI     1220011559559   Group) periode 24 Feb 2023 - 23 Mar 2023                  9,374,000    8,600,000    946,000        172,000         9,374,000

                                                  BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
                                                  Pemindahan Tiang di Jl. Pahlawan Rempoa Impact
983    08-Mar-23      MANDIRI     1220011559559   Pekerjaan Saluran Air site Bintaro-010                    2,516,424    2,580,947         -          64,523         2,516,424
                                                  BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
                                                  Pemindahan Tiang di Jl. Pertanian 2 Tanah Baru
984    08-Mar-23      MANDIRI     1220011559559   Depok site MP Cipedak-001                                 1,479,024    1,516,947         -          37,923         1,479,024
                                                  BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
                                                  Repair Tiang Miring dan perapihan Kabel di Jl.
985    08-Mar-23      MANDIRI     1220011559559   Penggilingan site MP Penggilingan-001                     4,344,978    4,456,387         -         111,409         4,344,978
                                                  BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
                                                  Penarikan Kabel FO Cut Impact Tertabrak Truck
986    08-Mar-23      MANDIRI     1220011559559   Dishub Jl. Marunda Kebantenan                             1,520,754    1,559,747         -          38,993         1,520,754
                                                  BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
                                                  Penarikan kabel FO Cut Impact Tertabrak Truck site
                                                  Diskominfo AP RW02, Kramat Pela, Kebayoran Bayu,
987    08-Mar-23      MANDIRI     1220011559559   Jak-Sel                                                   1,729,014    1,773,347         -          44,333         1,729,014
                                                  BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
                                                  Penarikan Kabel FO Cut Impact Tertabrak Truck site
988    08-Mar-23      MANDIRI     1220011559559   MP Cipedak-001                                            2,686,074    2,754,947         -          68,873         2,686,074

                                                  BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
                                                  Penarikan Kabel FO Cut Impact Kebakaran Sampah
989    08-Mar-23      MANDIRI     1220011559559   site MP Gunung Sahari Selatan-001                         1,235,274    1,266,947         -          31,673         1,235,274
                                                  FPU PENJAGA SITE, Pembayaran penjaga site dan
                                                  uang canang bulan Februari 2023 (nonTrf Bank
990    09-Mar-23      SINARMAS     00002999994    Sinarmas di 3 site BTS)                                   2,400,000    2,400,000         -             -           2,400,000
                                                  BENTENG ANUGERAH ASIH, PT, Biaya Pengiriman
                                                  Material Kabel dan Subduct dari PT Saka Jagad
991    09-Mar-23      MANDIRI     1220011559559   Pratama ke WH Serpong                                     2,279,300    2,300,000     25,300         46,000         2,279,300
                                                  SUBURMITRA GRAFISTAMA, PT, Pembelian Flyer
                                                  Promo februasik Periode Januari 2023 untuk
                                                  Keperluan Branding & Support Sales Area Jadetabek
                                                  30.900 Lbr, Flyer Promo Februasik Periode Januari
                                                  2023 untuk Keperluan Branding & Sales Area Bali-SBY
992    09-Mar-23      MANDIRI     1220011559559   4.000 Lbr                                                14,455,580   13,262,000   1,458,820       265,240        14,455,580
          09-Mar-23                               CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                  Material Cable dari WH Serpong ke WH Cipulir & WH
993                   MANDIRI     1220011559559   Green Mansion                                              743,250      750,000       8,250         15,000           743,250
         09-Mar-23                                CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
994                   MANDIRI     1220011559559   Material ONT dari WH Serpong ke WH Matraman                495,500      500,000       5,500         10,000           495,500
         09-Mar-23                                CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
995                   MANDIRI     1220011559559   Material ONT dari WH Serpong ke WH Matraman                495,500      500,000       5,500         10,000           495,500
         09-Mar-23                                CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                  Material Cable ADSS 24 Core dari PT Prysmian Cable
996                   MANDIRI     1220011559559   ke PT Kaliabang Jaya Pratama                               594,600      600,000       6,600         12,000           594,600
         09-Mar-23                                CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                  Material JC96 & 24Core, Battery ZTE dari WH
997                   MANDIRI     1220011559559   Serpong ke Office Matraman                                 495,500      500,000       5,500         10,000           495,500
         09-Mar-23                                CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                  Material ONT dari WH Serpong ke WH Cipulir & Ruko
998                   MANDIRI     1220011559559   Green Mansion                                              743,250      750,000       8,250         15,000           743,250
         09-Mar-23                                CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                  Material CCTV dari WH Serpong ke PT Simetrik
999                   MANDIRI     1220011559559   Integrasi                                                  495,500      500,000       5,500         10,000           495,500
         09-Mar-23                                CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
1000                  MANDIRI     1220011559559   Material ONT dari WH Serpong ke WH Cipulir                 495,500      500,000       5,500         10,000           495,500
         09-Mar-23                                DJAJA LISTRIK, PT, Pembelian Alat Kebersihan Blower
                                                  Kabel 2.3 CMM 2 Unit, Perkakas Fiber Optik Konektor
1001                  MANDIRI     1220011559559   2 Unit, dll                                               1,711,620    1,542,000    169,620            -           1,711,620
         09-Mar-23                                PERSADA BATAVIA MANDIRI, PT, Biaya Pengiriman
                                                  Material Cable Optical dari WH Serpong ke Office
1002                  MANDIRI     1220011559559   Surabaya & WH Bali                                        6,986,550    7,050,000     77,550        141,000         6,986,550
         09-Mar-23
                                                  PERSADA BATAVIA MANDIRI, PT, Biaya Pengiriman
                                                  Material Cable & Tiang dari PT Duta Anugrah Damai
1003                  MANDIRI     1220011559559   Sejahtera & PT Johnson Com ke WH Serpong                  2,477,500    2,500,000     27,500         50,000         2,477,500
                                                  BIBIT, Mr, Biaya Perbaikan FO Cut Link M_314 to
                                                  M_303 (TT. I0204-007) Kawasan ITDC - Badung (PO
1004   09-Mar-23      SINARMAS     00002999994    Rp.732.000,- Potongan PPh 21(3%) Rp.21.960,- )             710,040      732,000          -          21,960           710,040
                                                  BIBIT, Mr, Biaya Perbaikan FO Cut Link Aksess MCP
                                                  750213 Padang Sambian Klod-008 (TT. I0215-002) Jl.
                                                  Kunti II Seminyak - Badung.(PO Rp.3.775.170,-
1005   09-Mar-23      SINARMAS     00002999994    Potongan PPh 21(3%) Rp.113.255,10,- )                     3,661,915    3,775,170         -         113,255         3,661,915
                                                  BIBIT, Mr, Biaya Perbaikan FO Cut Link Aksess
                                                  GNY_77 Samu Singapadu (TT. I0212-008). Jl Raya
                                                  Samu, Singapadu ? Gianyar (PO Rp.1.769.725,-
1006   09-Mar-23      SINARMAS     00002999994    Potongan PPh 21(3%) Rp.53.091,75,- )                      1,716,633    1,769,725         -          53,092         1,716,633
Page 70
      TANGGAL
    PENGELUARAN                 NOMOR REKENING
       DI BANK  REKENING BANK     BANK YANG                                                               NILAI MUTASI                 NILAI YANG DIBAYARKAN
NO.  STATEMENT YANG DIGUNAKAN     DIGUNAKAN                NAMA VENDOR DAN KETERANGAN                        BANK         DPP          PPN             PPh       NET DIBAYARKAN
                                                 BIBIT, Mr, Biaya Pekerjaan Perbaikan FO Cut Link
                                                 Site_07 Kampial to Site_16 GWK (TT. I0203-005) Jl.
                                                 Pura Batu Pageh Ungasan - Badung (PO
1007   09-Mar-23   SINARMAS       00002999994    Rp.1.979.500,- Potongan PPh 21(3%) Rp.59.385,- )             1,920,115    1,979,500         -          59,385         1,920,115
                                                 BIBIT, Mr, Biaya Perbaikan FO Cut Link BLL_08
                                                 Beratan to BLL_16 Pegayaman (TT. I0205-012) Jl.
                                                 Raya Gitgit - Buleleng (PO Rp.1.737.400,- Potongan
1008   09-Mar-23   SINARMAS       00002999994    PPh 21(3%) Rp.52.122,- )                                     1,685,278    1,737,400         -          52,122         1,685,278
                                                 FPU PENJAGA SITE, Pembayaran penjaga site dan
                                                 uang canang bulan Februari 2023 (Trf Bank Sinarmas
1009   10-Mar-23   SINARMAS       0000240408     di 65 site BTS)                                             38,200,000   38,200,000         -             -          38,200,000
                                                 ASSET PACIFIC, PT, Biaya atas Pemakaian Listrik di
1010   10-Mar-23   MANDIRI       1220011559559   Gedung Menara Salemba periode Jan 2023                        121,338      120,136      13,215         12,013           121,338
                                                 INDOSAT TBK, PT, Sewa Domestik Link Platinum 10
1011   10-Mar-23   MANDIRI       1220011559559   Mbps periode Jan 2023                                        3,778,667    3,466,667    381,333         69,333         3,778,667
                                                 LINK NET TBK, PT, Sewa Crossconnect 35 Mbps dari
                                                 Omadata Wisma Dharmala Intiland Local Loop (PO
1012   10-Mar-23     BCA          3193058058     Tenant Intiland) periode Jan 2023                            9,810,000    9,000,000    990,000        180,000         9,810,000
                                                 LINK NET TBK, PT, Link Net IDC Duren Tiga (3D) to
                                                 Omadata Intiland Surabaya Tower LT.3 B00573-014
1013   10-Mar-23     BCA          3193058058     2Gbps periode Jan 2023                                      30,520,000   28,000,000   3,080,000       560,000        30,520,000

                                                 MULIA INTIPELANGI, PT, Biaya atas Pemakaian Listrik
1014   10-Mar-23     BCA          3193058058     Mall Taman Anggrek (GL-L5) Periode Feb 2023                  3,875,486    3,837,114    422,083        383,711         3,875,486
                                                 NTT INDONESIA, PT, Biaya Cross-Connect Rack S2
                                                 APJII Lantai 1 ke NTT Lantai 3A (Interkoneksi
1015   10-Mar-23   MANDIRI       1220011559559   Facebook) periode Jan 2023                                  10,900,000   10,000,000   1,100,000       200,000        10,900,000
                                                 NTT INDONESIA, PT, Sewa Crossconnect Establish
                                                 NTT Ether 150 Mbps At Cargill Level 26 W 46 periode
1016   10-Mar-23   MANDIRI       1220011559559   Jan 2023                                                    14,715,000   13,500,000   1,485,000       270,000        14,715,000
                                                 NTT INDONESIA, PT, Sewa NTT Fiber Connect (XC
1017   10-Mar-23   MANDIRI       1220011559559   Inter DC Akamai - APJII) periode Jan 2023                    7,085,000    6,500,000    715,000        130,000         7,085,000
                                                 NTT INDONESIA, PT, Sewa Crossconnect Establish
                                                 NTT Ether 150 Mbps At Cargill Level 26 W 46 periode
1018   10-Mar-23   MANDIRI       1220011559559   Des 2022                                                    14,715,000   13,500,000   1,485,000       270,000        14,715,000
                                                 PLAZA INDONESIA REALTY TBK, PT, Biaya atas
                                                 Pemakaian Listrik di Plaza Indonesia periode Jan
1019   10-Mar-23   MANDIRI       1220011559559   2023                                                          633,656      627,382      69,012         62,738           633,656
                                                 PPPSRSS SAHID SUDIRMAN CENTER, Biaya atas
                                                 Pemakaian Listrik di Sahid Sudirman Centre Lt. 29
1020   10-Mar-23   MANDIRI       1220011559559   periode 21 Dec 2022 - 20 Jan 2023                             215,843      213,706      23,507         21,370           215,843
                                                 PPPSRSS SAHID SUDIRMAN CENTER, Biaya atas
                                                 Pemakaian Listrik di Sahid Sudirman Centre Lt. 46
1021   10-Mar-23   MANDIRI       1220011559559   periode 21 Dec 2022 - 20 Jan 2023                             215,843      213,706      23,507         21,370           215,843
                                                 PPPSRSS SAHID SUDIRMAN CENTER, Biaya atas
                                                 Pemakaian Listrik di Sahid Sudirman Centre Lt. 11
1022   10-Mar-23   MANDIRI       1220011559559   periode 21 Dec 2022 - 20 Jan 2023                             232,553      230,251      25,327         23,025           232,553
                                                 SENAYAN TRIKARYA SEMPANA, PT, Biaya Pemakaian
                                                 Listrik di Sentral Senayan I Periode 28 Dec 2022 - 28
1023   10-Mar-23   MANDIRI       1220011559559   Jan 2023                                                        80,063      79,270       8,720          7,927            80,063
                                                 SENAYAN TRIKARYA SEMPANA, PT, Biaya Pemakaian
                                                 Listrik di Plaza Senayan periode 28 Dec 2022 - 28 Jan
1024   10-Mar-23   MANDIRI       1220011559559   2023                                                          437,351      433,020      47,633         43,302           437,351
                                                 SENAYAN TRIKARYA SEMPANA, PT, Biaya Pemakaian
                                                 Listrik di Plaza Senayan Arcadia periode 28 Dec 2022 -
1025   10-Mar-23   MANDIRI       1220011559559   28 Jan 2023                                                     67,276      66,610       7,327          6,661            67,276
                                                 SERPONG CIPTA KREASI, PT, Biaya atas Pemakaian
                                                 Listrik di Gedung Serpong M-Town Residence Periode
1026   10-Mar-23     BCA          3193058058     Januari 2023                                                 1,247,516    1,235,164    135,868        123,516         1,247,516

                                                 SUKA DUKA RAYA KAMPIAL, Biaya Management Fee
                                                 atas Revenue Sharing periode Desember 2022 di
1027   10-Mar-23   MANDIRI       1220011559559   Suka Duka Raya Kampial - Perumahan Raya Kampial              3,980,686    4,146,547         -         165,861         3,980,686

                                                 SUKA DUKA RAYA KAMPIAL, Biaya Management Fee
                                                 atas Revenue Sharing periode November 2022 di
1028   10-Mar-23   MANDIRI       1220011559559   Suka Duka Raya Kampial - Perumahan Raya Kampial              4,030,130    4,198,052         -         167,922         4,030,130
                                                 BENDARA SARANA ABADI, PT, Tagihan Revenue
                                                 Sharing Bali Fiber di Apartement City Light periode
1029   14-Mar-23   MANDIRI       1220011559559   Oktober - Desember 2022                                      2,038,400    2,080,000         -          41,600         2,038,400
                                                 GERAI LISTRIK PASAR MOBIL KEMAYORAN, Biaya
                                                 Tagihan Pascabayar untuk Site 70035 Gunung Sahari
                                                 Utara-008,700414 Gunung Sahari Utara-009 dan
                                                 701015 Danau Sunter DII-003 Periode Maret 2023
1030   14-Mar-23   MANDIRI       1220011559559   (Pemakaian Februari 2023)                                    4,795,074    4,892,932         -          97,858         4,795,074
                                                 GRIYA MURIA KENCANA, PT, Tagihan Revenue
                                                 Sharing periode Desember 2022 atas Penempatan
1031   14-Mar-23   MANDIRI       1220011559559   Perangkat Telekomunikasi di Gedung Prince Center              737,300      730,000      80,300         73,000           737,300
                                                 INDOKARYA SUKSES BERSAMA, PT, Biaya Sewa
                                                 Penempatan Perangkat Telekomunikasi di
                                                 Apartemen Paradise Mansion berdasarkan Profit
1032   14-Mar-23   MANDIRI       1220011559559   Sharing periode Juli - September 2022                        3,899,017    4,332,241         -         433,224         3,899,017
                                                 INDOKARYA SUKSES BERSAMA, PT, Biaya Sewa
                                                 Penempatan Perangkat Telekomunikasi di
                                                 Apartemen Paradise Mansion berdasarkan Profit
1033   14-Mar-23   MANDIRI       1220011559559   Sharing periode Oktober - Desember 2022                      2,598,923    2,887,692         -         288,769         2,598,923

                                                 INFRASTRUKTUR BISNIS SEJAHTERA, PT, Jasa Penguat
                                                 Sinyal untuk Tenant di Gedung The Plaza Office
1034   14-Mar-23   MANDIRI       1220011559559   Tower Berdasarkan Profit Sharing Desember 2022              50,431,777   45,434,033   4,997,744           -          50,431,777

                                                 INFRASTRUKTUR BISNIS SEJAHTERA, PT, Jasa Penguat
                                                 Sinyal untuk Tenant di Gedung The Gedung MSIG
1035   14-Mar-23   MANDIRI       1220011559559   Berdasarkan Profit Sharing Desember 2022                    91,273,331   82,228,226   9,045,105           -          91,273,331
Page 71
      TANGGAL
    PENGELUARAN                 NOMOR REKENING
       DI BANK  REKENING BANK     BANK YANG                                                           NILAI MUTASI                 NILAI YANG DIBAYARKAN
NO.  STATEMENT YANG DIGUNAKAN     DIGUNAKAN              NAMA VENDOR DAN KETERANGAN                      BANK         DPP          PPN             PPh       NET DIBAYARKAN

                                                 INFRASTRUKTUR BISNIS SEJAHTERA, PT, Jasa Penguat
                                                 Sinyal untuk Tenant di Gedung The Plaza Shopping
1036   14-Mar-23   MANDIRI       1220011559559   Center Berdasarkan Profit Sharing Desember 2022         21,653,952   19,508,065   2,145,887           -          21,653,952
                                                 KEMENTERIAN SEKRETARIS NEGARA RI PUSAT
                                                 PENGELOLAAN KOMPLEK GELORA BUNG KARNO,
                                                 Tagihan Sharing Revenue Bali Fiber di Komplek
1037   14-Mar-23   MANDIRI        0000670707     Gelora Bung Karno periode Juli - Desember 2022          68,004,648   61,265,449   6,739,199           -          68,004,648
                                                 PERHIMPUNAN PEMILIK DAN PENGHUNI SATUAN
                                                 RUMAH SUSUN APARTEMENT THE ELEMENTS, Biaya
                                                 Management Fee atas Revenue Sharing periode
                                                 Maret 2022 dan April 2022 di Apartemen The
1038   14-Mar-23   MANDIRI       1220011559559   Element                                                  3,525,200    3,597,142         -          71,942         3,525,200

                                                 PERHIMPUNAN PEMILIK DAN PENGHUNI SATUAN
                                                 RUMAH SUSUN APARTEMENT THE ELEMENTS, Biaya
                                                 Management Fee atas Revenue Sharing periode Mei
1039   14-Mar-23   MANDIRI       1220011559559   s/d Agustus 2022 di Apartemen The Element               10,480,170   10,694,051         -         213,881        10,480,170
                                                 SENAYAN TRIKARYA SEMPANA, PT, Biaya
                                                 Penempatan Sewa Perangkat Telekomunikasi
                                                 berdasarkan Revenue Sharing periode Okt - Des 2022
1040   14-Mar-23   MANDIRI       1220011559559   di Gedung Sentral Senayan I                               613,086      607,015      66,772         60,701           613,086
                                                 TOWER OPERATION, Uang Muka Beban Umum atas
                                                 FPU Biaya Pembelian Top Up Kuota XL Mikrotik
                                                 Monitoring NOC Periode Pemakaian Untuk April
1041   14-Mar-23   MANDIRI       1220011559559   2023 - Trf                                                313,500      313,500          -             -             313,500
                                                 XL AXIATA TBK, PT, Biaya Tagihan Pasca Bayar
                                                 Pembelian Pulsa XL Mikrotik (Monitoring NOC)
                                                 Periode Februari 2023 (Pemakaian Januari 2023-
1042   14-Mar-23   MANDIRI       1220011559559   Jabodetabek Area (10 Site)                               1,010,100     910,000     100,100            -           1,010,100

                                                 DITJEN POSTEL, BHP Frekuensi Periode 7 Maret 2023
1043   15-Mar-23   MANDIRI       1220011559559   s.d 6 Maret 2024 - No. Aplikasi : 02804014032023         9,838,382    9,838,382         -             -           9,838,382

                                                 DITJEN POSTEL, BHP Frekuensi Periode 7 Maret 2023
1044   15-Mar-23   MANDIRI       1220011559559   s.d 6 Maret 2024 - No. Aplikasi : 02804013032023         9,838,382    9,838,382         -             -           9,838,382
                                                 DITJEN POSTEL, BHP Frekuensi Periode 17 Februari
                                                 2023 s.d 16 Februari 2024 - No. Aplikasi :
1045   15-Mar-23   MANDIRI       1220011559559   02785949022023                                           9,891,252    9,891,252         -             -           9,891,252
                                                 DITJEN POSTEL, BHP Frekuensi Periode 17 Februari
                                                 2023 s.d 16 Februari 2024 - No. Aplikasi :
1046   15-Mar-23   MANDIRI       1220011559559   02785947022023                                           9,891,252    9,891,252         -             -           9,891,252
                                                 DITJEN POSTEL, BHP Frekuensi Radio Periode 17 Mar
                                                 2023 s.d 16 Mar 2024 - No. Aplikasi :
1047   15-Mar-23   MANDIRI       1220011559559   02339268032021                                           9,892,281    9,892,281         -             -           9,892,281
                                                 DITJEN POSTEL, BHP Frekuensi Radio Periode 17 Mar
                                                 2023 s.d 16 Mar 2024 - No. Aplikasi :
1048   15-Mar-23   MANDIRI       1220011559559   02339267032021                                           9,892,281    9,892,281         -             -           9,892,281
                                                 DITJEN POSTEL, BHP Frekuensi Radio Periode 17 Mar
                                                 2023 s.d 16 Mar 2024 - No. Aplikasi :
1049   15-Mar-23   MANDIRI       1220011559559   02339266032021                                           9,892,281    9,892,281         -             -           9,892,281
                                                 DITJEN POSTEL, BHP Frekuensi Radio Periode 17 Mar
                                                 2023 s.d 16 Mar 2024 - No. Aplikasi :
1050   15-Mar-23   MANDIRI       1220011559559   02339265032021                                           9,892,281    9,892,281         -             -           9,892,281
                                                 DITJEN POSTEL, BHP Frekuensi Radio Periode 17 Mar
                                                 2023 s.d 16 Mar 2024 - No. Aplikasi :
1051   15-Mar-23   MANDIRI       1220011559559   02339264032021                                           9,862,220    9,862,220         -             -           9,862,220
                                                 DITJEN POSTEL, BHP Frekuensi Radio Periode 17 Mar
                                                 2023 s.d 16 Mar 2024 - No. Aplikasi :
1052   15-Mar-23   MANDIRI       1220011559559   02339263032021                                           9,862,220    9,862,220         -             -           9,862,220
                                                 DITJEN POSTEL, BHP Frekuensi Radio Periode 17 Mar
                                                 2023 s.d 16 Mar 2024 - No. Aplikasi :
1053   15-Mar-23   MANDIRI       1220011559559   02339262032021                                           9,862,220    9,862,220         -             -           9,862,220
                                                 DITJEN POSTEL, BHP Frekuensi Radio Periode 17 Mar
                                                 2023 s.d 16 Mar 2024 - No. Aplikasi :
1054   15-Mar-23   MANDIRI       1220011559559   02339261032021                                           9,862,220    9,862,220         -             -           9,862,220
                                                 DITJEN POSTEL, BHP Frekuensi Radio Periode 30 Mar
                                                 2023 s.d 29 Mar 2024 - No. Aplikasi :
1055   15-Mar-23   MANDIRI       1220011559559   02347403032021                                           9,922,342    9,922,342         -             -           9,922,342
                                                 DITJEN POSTEL, BHP Frekuensi Radio Periode 30 Mar
                                                 2023 s.d 29 Mar 2024 - No. Aplikasi :
1056   15-Mar-23   MANDIRI       1220011559559   02347404032021                                           9,922,342    9,922,342         -             -           9,922,342
                                                 DITJEN POSTEL, BHP Frekuensi Radio Periode 30 Mar
                                                 2023 s.d 29 Mar 2024 - No. Aplikasi :
1057   15-Mar-23   MANDIRI       1220011559559   02347405032021                                           9,922,342    9,922,342         -             -           9,922,342
                                                 DITJEN POSTEL, BHP Frekuensi Radio Periode 30 Mar
                                                 2023 s.d 29 Mar 2024 - No. Aplikasi :
1058   15-Mar-23   MANDIRI       1220011559559   02347406032021                                           9,922,342    9,922,342         -             -           9,922,342

                                                 DITJEN POSTEL, BHP Frekuensi Radio Periode 19 Mar
1059   15-Mar-23   MANDIRI       1220011559559   2023 s.d 18 Mar 2024 - No. Aplikasi : 020196032014      14,087,204   14,087,204         -             -          14,087,204

                                                 DITJEN POSTEL, BHP Frekuensi Radio Periode 19 Mar
1060   15-Mar-23   MANDIRI       1220011559559   2023 s.d 18 Mar 2024 - No. Aplikasi : 020197032014      28,112,212   28,112,212         -             -          28,112,212

                                                 DITJEN POSTEL, BHP Frekuensi Radio Periode 19 Mar
1061   15-Mar-23   MANDIRI       1220011559559   2023 s.d 18 Mar 2024 - No. Aplikasi : 020198032014      72,953,712   72,953,712         -             -          72,953,712

                                                 DITJEN POSTEL, BHP Frekuensi Radio Periode 19 Mar
1062   15-Mar-23   MANDIRI       1220011559559   2023 s.d 18 Mar 2024 - No. Aplikasi : 020199032014       9,814,540    9,814,540         -             -           9,814,540

                                                 DITJEN POSTEL, BHP Frekuensi Radio Periode 19 Mar
1063   15-Mar-23   MANDIRI       1220011559559   2023 s.d 18 Mar 2024 - No. Aplikasi : 020199032014       9,814,540    9,814,540         -             -           9,814,540
Page 72
      TANGGAL
    PENGELUARAN                 NOMOR REKENING
       DI BANK  REKENING BANK     BANK YANG                                                              NILAI MUTASI                     NILAI YANG DIBAYARKAN
NO.  STATEMENT YANG DIGUNAKAN     DIGUNAKAN              NAMA VENDOR DAN KETERANGAN                         BANK            DPP           PPN             PPh       NET DIBAYARKAN

                                                 DITJEN POSTEL, BHP Frekuensi Radio Periode 19 Mar
1064   15-Mar-23   MANDIRI       1220011559559   2023 s.d 18 Mar 2024 - No. Aplikasi : 020199032014          7,012,504      7,012,504           -             -            7,012,504

                                                 DITJEN POSTEL, BHP Frekuensi Radio Periode 19 Mar
1065   15-Mar-23   MANDIRI       1220011559559   2023 s.d 18 Mar 2024 - No. Aplikasi : 020199032014          7,012,504      7,012,504           -             -            7,012,504

                                                 DITJEN POSTEL, BHP Frekuensi Radio Periode 19 Mar
1066   15-Mar-23   MANDIRI       1220011559559   2023 s.d 18 Mar 2024 - No. Aplikasi : 020199032014          9,814,540      9,814,540           -             -            9,814,540

                                                 DITJEN POSTEL, BHP Frekuensi Radio Periode 19 Mar
1067   15-Mar-23   MANDIRI       1220011559559   2023 s.d 18 Mar 2024 - No. Aplikasi : 020199032014          9,814,540      9,814,540           -             -            9,814,540
                                                 BALI PECATU GRAHA, PT, Biaya pembayaran tagihan
                                                 listrik dan IPL BPG Bulan Maret 2023(pemakaian
1068   16-Mar-23   SINARMAS       00002999994    bulan Februari 2023)                                       12,787,114     12,787,114           -             -           12,787,114
                                                 JEJARING ULTRA PRIMA, PT, Biaya Sewa Penempatan
                                                 Perangkat Telekomunikasi di Kawasan Summarecon
                                                 Corporate Berdasarkan Profit Sharing Juli 2022 -
1069   16-Mar-23   MANDIRI       1220011559559   September 2022                                             84,271,034     83,436,668     9,178,033     8,343,667         84,271,034
                                                 JEJARING ULTRA PRIMA, PT, Biaya Sewa Penempatan
                                                 Perangkat Telekomunikasi di Kawasan Summarecon
                                                 Residential Berdasarkan Profit Sharing Juli -
1070   16-Mar-23   MANDIRI       1220011559559   September 2022                                            145,811,127    144,367,452    15,880,420    14,436,745        145,811,127
                                                 PLN PERSERO, PT, Pengajuan Token Pulsa Listrik
1071   16-Mar-23   MANDIRI       1220011559559   Phase 03 Region Jawa Tengah Periode Maret 2023            109,717,000    109,717,000           -             -          109,717,000
                                                 WWW.RUMAHWEB.COM, Uang Muka Beban Umum
                                                 atas Biaya Renewal SSL balifiber.co.id (Periode April
1072   16-Mar-23   MANDIRI       1220011559559   2023-April 2024) - Trf                                       830,056         830,056           -             -             830,056

                                                 I WAYAN SELAMET, SH, Biaya penyusunan akta
                                                 perjanjian sewa lahan site 751155 Jimbaran 015 (PO
1073   16-Mar-23   SINARMAS       00002999994    Rp.820.513,- Potongan PPh 21(2.5%) Rp.20.513,- )             800,000         820,513           -          20,513           800,000
                                                 I WAYAN SELAMET, SH, Biaya penyusunan akta
                                                 perjanjian sewa lahan site 751152 Benoa 016 (PO
1074   16-Mar-23   SINARMAS       00002999994    Rp.769.230,- Potongan PPh 21(2.5%) Rp.19.230,- )             750,000         769,230           -          19,230           750,000
                                                 PLN PERSERO, PT, Biaya Tagihan Listrik PLN
1075   17-Mar-23   MANDIRI       1220011559559   Pascabayar BTS Region Bali Periode Maret 2023           1,158,854,910   1,158,854,910          -             -        1,158,854,910
                                                 PLN PERSERO, PT, Biaya PLN Autodebet Jawa Timur
1076   17-Mar-23   MANDIRI       1220011559559   Periode Maret 2023                                        166,782,677    166,782,677           -             -          166,782,677
                                                 PLN PERSERO, PT, 315 - Biaya PLN Auto Debet Region
1077   17-Mar-23   MANDIRI       1220011559559   Jawa Barat Periode Maret 2023                              54,569,769     54,569,769           -             -           54,569,769

                                                 PLN PERSERO, PT, Biaya Tagihan KWH PLN
1078   17-Mar-23   MANDIRI       1220011559559   Pascabayar Region Jawa Tengah Periode Maret 2023          144,960,317    144,960,317           -             -          144,960,317
                                                 PLN PERSERO, PT, Biaya Tagihan KWH PLN Pasca
1079   17-Mar-23   MANDIRI       1220011559559   Bayar Region Jabodetabek Periode Maret 2023             2,224,258,904   2,224,258,904          -             -        2,224,258,904
                                                 ADHI PERSADA PROPERTY, PT, Tagihan Revenue
                                                 Sharing Bali Fiber di Apartement Grand Dhika City
1080   20-Mar-23   MANDIRI       1220011559559   Periode Juni - September 2020                                122,580         122,580           -             -             122,580
                                                 API METRA GRAHA, PT, Tagihan Revenue Sharing
                                                 Minimum di Gedung Energy periode Oktober -
1081   20-Mar-23   MANDIRI       1220011559559   Desember 2022 (PKS Lampiran 1)                             21,210,000     21,000,000     2,310,000     2,100,000         21,210,000
                                                 CYBER NETWORK INDONESIA, PT, Biaya Sewa
1082   20-Mar-23   MANDIRI       1220011559559   Collocation OTB Nix Bali periode Mar 2023                   2,997,500      2,750,000      302,500         55,000          2,997,500
                                                 CYBER NETWORK INDONESIA, PT, Sewa Colocation
1083   20-Mar-23   MANDIRI       1220011559559   Rack IU OTB (MMR) periode Mar 2023                          3,270,000      3,000,000      330,000         60,000          3,270,000
                                                 DUTA TELEKOMINDO NUSANTARA, PT, Tagihan
                                                 Revenue Sharing Penempatan Jaringan dan Layanan
                                                 Bali Fiber di Apartement Tifolia periode periode
1084   20-Mar-23   MANDIRI       1220011559559   Oktober - Desember 2022                                    12,396,654     12,273,914     1,350,131     1,227,391         12,396,654
                                                 DUTA TELEKOMINDO NUSANTARA, PT, Tagihan
                                                 Revenue Sharing Penempatan Jaringan dan Layanan
                                                 Bali Fiber di Apartement Callia Pulomas periode
1085   20-Mar-23   MANDIRI       1220011559559   Oktober - Desember 2022                                     3,998,952      3,959,358      435,529        395,935          3,998,952
                                                 DUTA TELEKOMINDO NUSANTARA, PT, Tagihan
                                                 Revenue Sharing Penempatan Jaringan dan Layanan
                                                 Bali Fiber di Apartement Citylofts Sudirman periode
1086   20-Mar-23   MANDIRI       1220011559559   Oktober - Desember 2022                                     2,580,550      2,555,000      281,050        255,500          2,580,550
                                                 GRAHA MEGAH SEJAHTERA, PT, Biaya Management
                                                 Fee atas Revenue Sharing periode Oktober -
1087   20-Mar-23   MANDIRI       1220011559559   Desember 2022 di Gedung Plaza Timor 2                       2,235,379      2,050,806      225,589         41,016          2,235,379
                                                 GRAHA MENARA HIJAU, PT, Biaya Sewa Penempatan
                                                 Perangkat Telekomunikasi di Gedung Menara Hijau
                                                 berdasarkan Profit Sharing periode Oktober -
1088   20-Mar-23   MANDIRI       1220011559559   Desember 2022                                               3,982,632      3,943,200      433,752        394,320          3,982,632

                                                 INFRASTRUKTUR BISNIS SEJAHTERA, PT, Jasa Penguat
                                                 Sinyal untuk Tenant di Gedung The Plaza Office
1089   20-Mar-23   MANDIRI       1220011559559   Tower Berdasarkan Profit Sharing Januari 2023             132,157,528    119,060,836    13,096,692           -          132,157,528

                                                 INFRASTRUKTUR BISNIS SEJAHTERA, PT, Jasa Penguat
                                                 Sinyal untuk Tenant di Gedung The Plaza Shopping
1090   20-Mar-23   MANDIRI       1220011559559   Center Berdasarkan Profit Sharing Januari 2023             20,555,588     18,518,548     2,037,040           -           20,555,588

                                                 INFRASTRUKTUR BISNIS SEJAHTERA, PT, Jasa Penguat
                                                 Sinyal untuk Tenant di Gedung The Gedung MSIG
1091   20-Mar-23   MANDIRI       1220011559559   Berdasarkan Profit Sharing Januari 2023                    29,470,500     26,550,000     2,920,500           -           29,470,500
                                                 INTERNETINDO DATA CENTRA INDONESIA, PT, Biaya
                                                 Sewa Penambahan Redundant Power Source Rack
1092   20-Mar-23   MANDIRI       1220011559559   Winter 233 periode Feb 2023                                 2,180,000      2,000,000      220,000         40,000          2,180,000
                                                 INTERNETINDO DATA CENTRA INDONESIA, PT, Sewa
                                                 Crossconnect 3D 4 UTP dan 3D 3 FO periode Feb
1093   20-Mar-23   MANDIRI       1220011559559   2023                                                        2,943,000      2,700,000      297,000         54,000          2,943,000
Page 73
      TANGGAL
    PENGELUARAN                 NOMOR REKENING
       DI BANK  REKENING BANK     BANK YANG                                                           NILAI MUTASI                  NILAI YANG DIBAYARKAN
NO.  STATEMENT YANG DIGUNAKAN     DIGUNAKAN               NAMA VENDOR DAN KETERANGAN                     BANK          DPP          PPN             PPh       NET DIBAYARKAN
                                                 INTERNETINDO DATA CENTRA INDONESIA, PT,
                                                 Tagihan Kelebihan Pemakaian Listrik Rack No Winter
1094   20-Mar-23      MANDIRI    1220011559559   233 Per 1 - 31 Jan 2023 (IDC Indonesia)                 10,682,000     9,800,000   1,078,000       196,000         10,682,000
                                                 MENARA PRAMBANAN, PT, Tagihan Sharing Revenue
                                                 Bali Fiber di Mall Poins Square periode Oktober -
1095   20-Mar-23      MANDIRI    1220011559559   Desember 2022                                             676,700       670,000      73,700         67,000           676,700
                                                 NUSA KIRANA REAL ESTATE, PT, Biaya Sewa
                                                 Penempatan Perangkat Telekomunikasi di Gedung
                                                 Kirana Boutique Berdasarkan Penggunaan Jaringan
1096   20-Mar-23      MANDIRI    1220011559559   Internet periode Oktober - Desember 2023                12,953,250    12,825,000   1,410,750     1,282,500         12,953,250
                                                 NUSA KIRANA REAL ESTATE, PT, Biaya Sewa
                                                 Penempatan Perangkat Telekomunikasi di Gedung
                                                 Kirana Boutique Berdasarkan Penggunaan Jaringan
1097   20-Mar-23      MANDIRI    1220011559559   Internet periode Juli - September 2022                  13,121,733    12,991,815   1,429,099     1,299,181         13,121,733
                                                 OMADATA PADMA INDONESIA, PT, Biaya Sewa
                                                 Management Cable - MMR 1U OTB Periode Mar
1098   20-Mar-23      MANDIRI    1220011559559   2023 (Omadata)                                           1,635,000     1,500,000    165,000         30,000          1,635,000
                                                 OMADATA PADMA INDONESIA, PT, Biaya Sewa
                                                 Management Cable MMR 1U Open Rack Periode Mar
1099   20-Mar-23      MANDIRI    1220011559559   2023                                                     2,180,000     2,000,000    220,000         40,000          2,180,000
                                                 PAKARTI JAYA, PT, Biaya Penempatan Sewa
                                                 Perangkat Telekomunikasi berdasarkan Revenue
                                                 Sharing periode Oktober - Desember 2022 di Gedung
1100   20-Mar-23      MANDIRI    1220011559559   Pakarti Center                                            915,600       840,000      92,400         16,800           915,600

                                                 PERHIMPUNAN PENGHUNI GEDUNG PERKANTORAN
                                                 KIRANA TWO, Biaya Sewa Penempatan Perangkat
                                                 Telekomunikasi di Gedung Kirana Two Berdasarkan
1101   20-Mar-23      MANDIRI    1220011559559   Profit Sharing periode Oktober - Desember 2022           5,184,000     5,760,000         -         576,000          5,184,000
                                                 PERHIMPUNAN PENGHUNI RUMAH SUSUN
                                                 HAMPTONS PARK, Tagihan Revenue Sharing Bali
                                                 Fiber di Apartement Hamptons Park periode Oktober
1102   20-Mar-23      MANDIRI    1220011559559   - Desember 2022                                          1,067,693     1,089,482         -          21,789          1,067,693
                                                 PLN PERSERO, PT, Pengajuan Token Pulsa Listrik
1103   20-Mar-23      MANDIRI    1220011559559   Phase 03 Region Jawa Barat Periode Maret 2023           42,876,500    42,876,500         -             -           42,876,500
                                                 PLN PERSERO, PT, Pengajuan Token Pulsa Listrik
1104   20-Mar-23      MANDIRI    1220011559559   Phase 03 Region Jabotabek Periode Maret 2023           243,939,000   243,939,000         -             -          243,939,000
                                                 PPPSRS APARTEMENT PERMATA SURYA 1, Tagihan
                                                 Revenue Sharing Bali Fiber di Apartement Permata
1105   20-Mar-23      MANDIRI    1220011559559   Surya I periode Oktober - Desember 2022                  5,234,878     5,816,531         -         581,653          5,234,878
                                                 ROYAL ORIENTAL, PT, Sewa Penempatan Perangkat
                                                 di Gedung Dimo Space Tahun Ke-3 periode 19 Jun
1106   20-Mar-23      MANDIRI    1220011559559   2022 - 18 Jun 2023                                      10,708,929    10,602,900   1,166,319     1,060,290         10,708,929

                                                 SERPONG MAS TELEMATIKA, PT, Biaya Management
                                                 Fee atas Revenue Sharing Residential periode
1107   20-Mar-23      MANDIRI    1220011559559   Desember 2022 di Kawasan Bumi Serpong Damai              1,595,063     1,463,360    160,970         29,267          1,595,063
                                                 TECHNOLOGY DATA INDONESIA, PT, Biaya Sewa Rack
                                                 Summer 243 IDC Duren Tiga (Colocation 1/2 Rack)
1108   20-Mar-23      MANDIRI    1220011559559   Periode 1 s/d 28 Feb 2023                                7,630,000     7,000,000    770,000        140,000          7,630,000
                                                 TECHNOLOGY DATA INDONESIA, PT, Tagihan
                                                 Reimbursement Listrik Rack No. Summer 243
1109   20-Mar-23      MANDIRI    1220011559559   Periode Jan 2023                                          763,000       700,000      77,000         14,000           763,000
                                                 TECHNOLOGY DATA INDONESIA, PT, Tagihan
                                                 Reimbursement Listrik Rack No. Summer 243
1110   20-Mar-23      MANDIRI    1220011559559   Periode Des 2022                                          763,000       700,000      77,000         14,000           763,000
                                                 TEKNOVATUS SOLUSI SEJAHTERA, PT, Tagihan Sewa
                                                 Collocation Rack 47 U 19" periode Feb 2023 dan
1111   20-Mar-23      MANDIRI    1220011559559   Kelebihan Pemakaian Listrik periode Jan 2023            29,433,924    27,003,600   2,970,396       540,072         29,433,924
                                                 TIRTA INDORAYA LOGISTICS, PT, Biaya Pengiriman
                                                 Material Cable Optical Drop SM 1 Core dari PT
1112   20-Mar-23      MANDIRI    1220011559559   Furukawa ke WH Serpong                                   2,398,000     2,200,000    242,000         44,000          2,398,000
                                                 TRANS INDONESIA SUPERKORIDOR, PT, Biaya Sewa
                                                 Intercity Jakarta - Diskominfo Cirebon 500Mbps
1113   20-Mar-23      MANDIRI    1220011559559   periode 01 - 31 Des 2022                                 9,265,000     8,500,000    935,000        170,000          9,265,000
                                                 TRANS INDONESIA SUPERKORIDOR, PT, Sewa
                                                 Intercity IDC Duren Tiga - RK0004 Office Gatot
1114   20-Mar-23      MANDIRI    1220011559559   Subroto periode 01 - 31 Jan 2023                         9,201,072     8,441,350    928,549        168,827          9,201,072
                                                 TRANS INDONESIA SUPERKORIDOR, PT, Sewa
                                                 Intercity IDC Duren Tiga - RK0004 Office Gatot
1115   20-Mar-23      MANDIRI    1220011559559   Subroto periode 01 - 31 Des 2022                         9,265,000     8,500,000    935,000        170,000          9,265,000
                                                 VIFA INDO SUKSES, PT, Pembelian Genset Portable
                                                 Super Silent 2.000 Watt Krisbow Genset untuk
                                                 Keperluan Preventive Maintenace FTTX Ops
1116   20-Mar-23      MANDIRI    1220011559559   Sebanyak 1 Unit                                         13,161,825    11,857,500   1,304,325           -           13,161,825
          20-Mar-23                              CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                 Material JC 96 & 48 Core, Cable NYAF, Battery
1117                  MANDIRI    1220011559559   Lithium 48V dari WH Serpong ke Office Matraman            495,500       500,000       5,500         10,000           495,500
         20-Mar-23                               CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                 Material Cable Duct 32 Core dari WH Serpong ke PT
1118                  MANDIRI    1220011559559   Mahaga Pratama                                            495,500       500,000       5,500         10,000           495,500
         20-Mar-23                               CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                 Material Cable Duct 32 Core dari WH Serpong ke PT
1119                  MANDIRI    1220011559559   Kaliabang Jaya Pratama                                    495,500       500,000       5,500         10,000           495,500
         20-Mar-23                               CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                 Material JC 96 & 24 Core, Battery ZTE dari WH
1120                  MANDIRI    1220011559559   Serpong ke Office Matraman                                495,500       500,000       5,500         10,000           495,500
         20-Mar-23                               CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                 Material Cable dari WH Serpong ke WH Cipulir &
1121                  MANDIRI    1220011559559   Ruko Green Mansion                                        743,250       750,000       8,250         15,000           743,250
         20-Mar-23                               CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                 Material CCTV dari PT Siri Solusi Nusantara ke WH
1122                  MANDIRI    1220011559559   Serpong                                                  2,973,000     3,000,000     33,000         60,000          2,973,000
Page 74
      TANGGAL
    PENGELUARAN                    NOMOR REKENING
       DI BANK     REKENING BANK     BANK YANG                                                             NILAI MUTASI                 NILAI YANG DIBAYARKAN
NO.  STATEMENT YANG DIGUNAKAN        DIGUNAKAN               NAMA VENDOR DAN KETERANGAN                       BANK         DPP          PPN             PPh       NET DIBAYARKAN
         20-Mar-23                                  CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                    Material CCTV dari WH Serpong ke PT Morasha Inti
1123                 MANDIRI        1220011559559   Shabira                                                    2,180,200    2,200,000     24,200         44,000         2,180,200
         20-Mar-23                                  CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                    Material Cable ADSS 96 Core dari WH Serpong ke PT
1124                 MANDIRI        1220011559559   Rosalindo Bhatara Sakti                                     495,500      500,000       5,500         10,000           495,500
         20-Mar-23                                  CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                    Material Kabel dari PT Prysmian Cable ke PT Andalan
1125                 MANDIRI        1220011559559   Kreatif Utama                                               594,600      600,000       6,600         12,000           594,600
         20-Mar-23                                  CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
1126                 MANDIRI        1220011559559   Material Cable dari WH Serpong ke Office Cipulir            495,500      500,000       5,500         10,000           495,500
         20-Mar-23                                  CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                    Material Kabel ADSS 24 & 32 Core dari WH Serpong
1127                 MANDIRI        1220011559559   ke PT Pandatel Utama Mandiri                                495,500      500,000       5,500         10,000           495,500
         20-Mar-23                                  CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                    Material Cable ADSS 24 Core dari PT Prysmian Cable
1128                 MANDIRI        1220011559559   ke WH Matraman                                              594,600      600,000       6,600         12,000           594,600
         20-Mar-23                                  CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                    Material Battery Lithium 48V 100AH ZTE dari WH
1129                 MANDIRI        1220011559559   Serpong ke Office Bandung                                   991,000     1,000,000     11,000         20,000           991,000
         20-Mar-23                                  CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
1130                 MANDIRI        1220011559559   Material CCTV dari Office Bandung ke WH Serpong            1,288,300    1,300,000     14,300         26,000         1,288,300
         20-Mar-23                                  CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                    Material Battery Lithium 48V 100AH ZTE dari WH
1131                 MANDIRI        1220011559559   Serpong ke WH Matraman                                      495,500      500,000       5,500         10,000           495,500
         20-Mar-23                                  CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                    Material Rectifier, JC 24 & 96 Core dari WH Serpong
1132                 MANDIRI        1220011559559   ke WH matraman                                              495,500      500,000       5,500         10,000           495,500
         20-Mar-23                                  CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
1133                 MANDIRI        1220011559559   Material Cable dari WH Serpong ke WH Matraman               495,500      500,000       5,500         10,000           495,500
                                                    CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                    Material Pole Fiber Optic Round 7M dari PT DHJ ke
1134   20-Mar-23     MANDIRI        1220011559559   WH Serpong                                                 3,220,750    3,250,000     35,750         65,000         3,220,750
                                                    CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                    Material CCTV Hikvision dari WH Serpong ke WH
1135   20-Mar-23     MANDIRI        1220011559559   Penjernihan                                                 495,500      500,000       5,500         10,000           495,500
                                                    CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                    Material Door Sensor, Frame SLA dari WH Serpong
1136   20-Mar-23     MANDIRI        1220011559559   ke PT Nobi Putra Angkasa                                    495,500      500,000       5,500         10,000           495,500
                                                    CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                    Material CCTV, Cable, Speaker dari WH Penjernihan
1137   20-Mar-23     MANDIRI        1220011559559   ke WH Serpong                                               495,500      500,000       5,500         10,000           495,500

                                                    BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
                                                    Penarikan Kabel FO Cut Impact tertabrak Truck site
1138   20-Mar-23     MANDIRI        1220011559559   Diskominfo AP RW15, Cililitan, Kramat Jati, Jak-tim        1,730,405    1,778,947         -          48,542         1,730,405
                                                    BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
1139   20-Mar-23     MANDIRI        1220011559559   FO Cut Site Curug-006                                      1,584,846    1,713,347         -         128,501         1,584,846
                                                    ASOSIASI PENYELENGGARA JASA INTERNET
                                                    INDONESIA, Uang Muka Beban Umum atas Biaya
                                                    Sewa IP Public (IP ADD/21 per April 2023 - Maret
1140   21-Mar-23       BCA           3193058058     2024) APJII - PR : 1010032635 - Trf                       11,990,000   11,990,000         -             -          11,990,000
                                                    INDOSAT TBK, PT, Sewa Domestik Link Platinum 10
1141   21-Mar-23     MANDIRI        1220011559559   Mbps periode Feb 2023                                      4,360,000    4,000,000    440,000         80,000         4,360,000
                                                    LINK NET TBK, PT, Link Net IDC Duren Tiga (3D) to
                                                    Omadata Intiland Surabaya Tower LT.3 B00573-014
1142   21-Mar-23     MANDIRI        1220011559559   2Gbps periode Feb 2023                                    30,520,000   28,000,000   3,080,000       560,000        30,520,000
                                                    MEGA AKSES PERSADA, PT, Sewa Layanan Jabalink
                                                    500Mbps (Fiberstar) Jakarta - Bandung periode Feb
1143   21-Mar-23     MANDIRI        1220011559559   2023                                                       9,265,000    8,500,000    935,000        170,000         9,265,000
                                                    MEGA AKSES PERSADA, PT, Biaya Instalasi & Sewa
                                                    Layanan Jabalink 500Mbps (Fiberstar) Jakarta -
1144   21-Mar-23     MANDIRI        1220011559559   Bandung periode 17 - 31 Jan 2023                           8,843,064    8,112,903    892,419        162,258         8,843,064
                                                    MEGA AKSES PERSADA, PT, Sewa Layanan Jabalink
                                                    500Mbps (Fiberstar) Intercity Jakarta - Diskominfo
1145   21-Mar-23     MANDIRI        1220011559559   Cirebon periode Feb 2023                                   8,720,000    8,000,000    880,000        160,000         8,720,000

                                                    MEGA AKSES PERSADA, PT, Sewa Layanan Jabalink
                                                    1Gbps P2P dari IDC Duren Tiga ke Jabalink Bali Tower
1146   21-Mar-23     MANDIRI        1220011559559   Surabaya Omadata Center periode Feb 2023                  25,070,000   23,000,000   2,530,000       460,000        25,070,000
                                                    NTT INDONESIA, PT, Biaya Cross-Connect Rack S2
                                                    APJII Lantai 1 ke NTT Lantai 3A (Interkoneksi
1147   21-Mar-23       BCA           3193058058     Facebook) periode Feb 2023                                10,900,000   10,000,000   1,100,000       200,000        10,900,000
                                                    NTT INDONESIA, PT, Sewa NTT Fiber Connect (XC
1148   21-Mar-23       BCA           3193058058     Inter DC Akamai - APJII) periode Feb 2023                  7,085,000    6,500,000    715,000        130,000         7,085,000
                                                    PENGELOLA MASPION PLAZA GUNUNG SAHARI,
                                                    Biaya open booth Balifiber di Maspion Plaza tgl 25
1149   21-Mar-23     MANDIRI        1220011559559   Jan 2023                                                    180,000      200,000          -          20,000           180,000
                                                    PLN PERSERO, PT, Biaya Pembelian Token kwh Listrik
1150   21-Mar-23     MANDIRI        1220011559559   PLN Site Braga 1 Kota Bandung                                 43,000      43,000          -             -              43,000
                                                    PLN PERSERO, PT, Biaya Pembelian Token kwh Listrik
1151   21-Mar-23     MANDIRI        1220011559559   PLN Site Timuran-003                                        103,500      103,500          -             -             103,500
                                                    RAJAWALI ADIWISMA, PT, Tagihan Revenue Sharing
                                                    periode September - Desember 2022 atas Sewa
                                                    Penempatan Perangkat Telekomunikasi di Gedung
1152   21-Mar-23     MANDIRI        1220011559559   Menara Rajawali                                            6,049,900    5,990,000    658,900        599,000         6,049,900
                                                    SMARTFREN TELECOM TBK, PT, Tagihan Telepon
1153   21-Mar-23     MANDIRI        1220011559559   Divisi Marketing Communications Bulan Feb 2023                11,261      10,145       1,116            -              11,261
                                                    TELEKOMUNIKASI SELULAR, PT, Biaya Top Up Paket
                                                    Data Mikrotik site Nageri Kaler-008, Sriwijaya-MP, &
1154   21-Mar-23     MANDIRI        1220011559559   MP Daeng Mohamad Ardiwinata                                 304,500      304,500          -             -             304,500
                                                    TELEKOMUNIKASI SELULAR, PT, Biaya Paket Data
                                                    Pascabayar Telkomsel Mikrotik untuk Monitoring
                                                    Alarm. Periode Maret 2023 Jawa Tengah sebanyak 7
1155   21-Mar-23     MANDIRI        1220011559559   MSISDN                                                      555,000      500,000      55,000            -             555,000
Page 75
      TANGGAL
    PENGELUARAN                 NOMOR REKENING
       DI BANK  REKENING BANK     BANK YANG                                                                NILAI MUTASI                   NILAI YANG DIBAYARKAN
NO.  STATEMENT YANG DIGUNAKAN     DIGUNAKAN               NAMA VENDOR DAN KETERANGAN                          BANK          DPP           PPN             PPh       NET DIBAYARKAN
                                                 TELEKOMUNIKASI SELULAR, PT, Biaya Paket Data
                                                 Pascabayar Telkomsel Mikrotik untuk Monitoring
                                                 Alarm. Periode Maret 2023 Jawa Tengah sebanyak
1156   21-Mar-23   MANDIRI       1220011559559   10 MSISDN                                                     1,054,500      950,000      104,500            -            1,054,500
                                                 TELKOM INDONESIA, PT, Biaya Paket Broadband
                                                 Indihome for Monitoring (CSR) CCTV, FO not ready.
1157   21-Mar-23   MANDIRI       1220011559559   Periode Maret 2023 area Yogyakarta                            1,265,400     1,140,000     125,400            -            1,265,400
                                                 TOKOPEDIA, PT, Biaya Pembelian Alat Ukur
                                                 Ketebalan Digital GM100 untuk keperluan tim
1158   21-Mar-23   MANDIRI       1220011559559   Planning & Engineering                                        1,238,200     1,238,200          -             -            1,238,200
                                                 XL AXIATA TBK, PT, Biaya Top Up Paket Data Mikrotik
                                                 site Tawangsari-008 Tenant Smartfren Periode
1159   21-Mar-23   MANDIRI       1220011559559   Februari 2023 Region Jawa Tengah                                 61,500       61,500           -             -              61,500
                                                 BINTANG MAS UTAMA, CV, Pembelian Cable Ties 30
                                                 cm hitam,Isolasi Scotch Super 3M 33+,Connector
                                                 RJ45 Cat 5e AMP Compscope,Cable Ties 50 cm
                                                 hitam,Imundex Round Cable, Tenda POE Injector dan
                                                 TP Link Media Converter (PO Rp.4.065.375,- PPN
1160   24-Mar-23   SINARMAS       00002999994    Rp.402.875,-)                                                 4,065,375     3,662,500     402,875            -            4,065,375
                                                 HARMAS JALESVEVA, PT, Tagihan Revenue Sharing
                                                 Bali Fiber di Mall One Belpark periode Oktober -
1161   24-Mar-23   MANDIRI       1220011559559   Desember 2022                                                 3,810,225     3,772,500     414,975        377,250          3,810,225
                                                 I WAYAN SELAMET, SH, Biaya penyusunan akta
                                                 perjanjian sewa lahan site 751159 Canggu_007 (PO
1162   24-Mar-23   SINARMAS       00002999994    Rp.512.820,- Potongan PPh 21(2.5%) 12.820,-)                   500,000       512,820           -          12,820           500,000
                                                 I WAYAN SELAMET, SH, Biaya penyusunan akta
                                                 perjanjian sewa lahan site 751163 Kerobokan
                                                 Kelod_021 (PO Rp.1.025.641,- Potongan PPh
1163   24-Mar-23   SINARMAS       00002999994    21(2.5%) Rp.25.641,- )                                        1,000,000     1,025,641          -          25,641          1,000,000
                                                 BIBIT, Mr, Biaya Perbaikan FO Cut Link Site_27
                                                 Beringkit to Site_49 Lukluk (TT. I0227-007) Jl. Raya
                                                 Kapal, Mengwi - Badung.(PO Rp.878.000,- Potongan
1164   24-Mar-23   SINARMAS       00002999994    PPh 21(3%) Rp.26.340,-)                                        851,660       878,000           -          26,340           851,660
                                                 BIBIT, Mr, Biaya pekerjaan perbaikan FO Cut TT.I0301-
                                                 001 link Site 16 GWK to Site 07 kampial Jln Uluwatu
                                                 Ungasan, Badung.(PO Rp.2.295.000,- Potongan PPh
1165   24-Mar-23   SINARMAS       00002999994    21(3%) Rp.68.850,-)                                           2,226,150     2,295,000          -          68,850          2,226,150
                                                 BIBIT, Mr, Biaya Pekerjaan Perbaikan FO Cut Feeder
                                                 Link Cluster Banjar Kertha Graha dan Dismantle
                                                 Kabel Feeder Link Cluster Banjar Kertha Graha-
                                                 DPS_41 (PO Rp.4.816.210,- Potongan PPh 21(3%)
1166   24-Mar-23   SINARMAS       00002999994    Rp.144.486,- )                                                4,671,724     4,816,210          -         144,486          4,671,724
                                                 BIBIT, Mr, Biaya Perbaikan FO Cut Link Aksess
                                                 GNY_77 (TT. I0226-010 & TT. I0226-011) Jl. Raya
                                                 Samu, Singapadu - Gianyar.(PO Rp.1.773.900,-
1167   24-Mar-23   SINARMAS       00002999994    Potongan PPh 21(3%) Rp.53.217,- )                             1,720,683     1,773,900          -          53,217          1,720,683
                                                 IMAM TAUFIK, Biaya Perbaikan FO Cut Link Aksess
                                                 Site_20 Bali Clift (TT.I0221-001) Jl. Pura Batu Pageh -
                                                 Ungasan, Badung (PO Rp.2.273.400,- Potongan PPh
1168   24-Mar-23   SINARMAS       00002999994    21(3%) Rp.68.202,-)                                           2,205,198     2,273,400          -          68,202          2,205,198
                                                 IMAM TAUFIK, Biaya Pekerjaan Perbaikan FO Cut
                                                 Link Site_05 to DPS_27 & 750035 (TT. I0215-012) Jl.
                                                 By Pass Ngurah Rai(PO Rp.1.576.000,- Potongan PPh
1169   24-Mar-23   SINARMAS       00002999994    21(3%) Rp.47.280,-)                                           1,528,720     1,576,000          -          47,280          1,528,720

                                                 ENLULU SUKSES MAKMUR, PT, Reimbursement
1170   27-Mar-23   MANDIRI       1220011559559   Salary Outsource Div. Direct Sales Periode Feb 2023          13,046,400    12,960,000     105,600         19,200         13,046,400

                                                 ENLULU SUKSES MAKMUR, PT, Reimbursement
1171   27-Mar-23   MANDIRI       1220011559559   Insentif Outsource Div. Direct Sales periode Jan 2023         8,435,341     8,379,478      68,277         12,414          8,435,341
                                                 LINK NET TBK, PT, Link Net IDC D3 Jakarta to NIX Bali
1172   27-Mar-23   MANDIRI       1220011559559   B00573-009 10Gbps periode Feb 2023                          201,650,000   185,000,000   20,350,000     3,700,000        201,650,000
                                                 MORA TELEMATIKA INDONESIA, PT, Sewa
                                                 Colocation, Kabel Shaft, Colocation OTB 2U & Biaya
                                                 Interkoneksi antar Rak MMR periode 01.12.2022 -
1173   27-Mar-23   MANDIRI       1220011559559   31.12.2022                                                    9,265,000     8,500,000     935,000        170,000          9,265,000
                                                 MORA TELEMATIKA INDONESIA, PT, Sewa Core FO
                                                 dari MP Antosari ke MP Beringkit periode 05.09.2022
1174   27-Mar-23   MANDIRI       1220011559559   - 04.10.2022                                                 28,955,850    26,565,000    2,922,150       531,300         28,955,850
                                                 MORA TELEMATIKA INDONESIA, PT, Sewa Core FO
                                                 dari MP Antosari ke MP Beringkit periode 05.10.2022
1175   27-Mar-23   MANDIRI       1220011559559   - 04.11.2022                                                 28,955,850    26,565,000    2,922,150       531,300         28,955,850
                                                 MORA TELEMATIKA INDONESIA, PT, Sewa Core FO
                                                 dari MP Antosari ke MP Beringkit periode 05.11.2022
1176   27-Mar-23   MANDIRI       1220011559559   - 04.12.2022                                                 28,955,850    26,565,000    2,922,150       531,300         28,955,850
                                                 MORA TELEMATIKA INDONESIA, PT, Sewa Metro-E
                                                 1.5 Gbps NDC Jatinegara - Pop BTS Karawang periode
1177   27-Mar-23   MANDIRI       1220011559559   18.07.2022 - 17.08.2022                                      42,510,000    39,000,000    4,290,000       780,000         42,510,000
                                                 MORA TELEMATIKA INDONESIA, PT, Sewa Metro-E
                                                 1.5 Gbps NDC Jatinegara - Pop BTS Karawang periode
1178   27-Mar-23   MANDIRI       1220011559559   18.08.2022 - 17.09.2022                                      42,510,000    39,000,000    4,290,000       780,000         42,510,000
                                                 MORA TELEMATIKA INDONESIA, PT, Sewa Metro-E
                                                 1.5 Gbps NDC Jatinegara - Pop BTS Karawang periode
1179   27-Mar-23   MANDIRI       1220011559559   18.09.2022 - 17.10.2022                                      42,510,000    39,000,000    4,290,000       780,000         42,510,000
                                                 MORA TELEMATIKA INDONESIA, PT, Sewa Metro-E
                                                 1.5 Gbps NDC Jatinegara - Pop BTS Karawang periode
1180   27-Mar-23   MANDIRI       1220011559559   18.10.2022 - 17.11.2022                                      42,510,000    39,000,000    4,290,000       780,000         42,510,000
                                                 MORA TELEMATIKA INDONESIA, PT, Sewa Core FO
                                                 dari MP Kampung Melayu ke NDC Jatinegara periode
1181   27-Mar-23   MANDIRI       1220011559559   15.11.2022 - 14.12.2022                                       8,011,500     7,350,000     808,500        147,000          8,011,500
                                                 MORA TELEMATIKA INDONESIA, PT, Sewa Core FO
                                                 IDC Duren Tiga ke NDC Jatinegara periode
1182   27-Mar-23   MANDIRI       1220011559559   28.11.2022 - 27.12.2022                                       9,156,000     8,400,000     924,000        168,000          9,156,000
Page 76
      TANGGAL
    PENGELUARAN                  NOMOR REKENING
       DI BANK  REKENING BANK      BANK YANG                                                               NILAI MUTASI                   NILAI YANG DIBAYARKAN
NO.  STATEMENT YANG DIGUNAKAN      DIGUNAKAN                NAMA VENDOR DAN KETERANGAN                        BANK          DPP           PPN             PPh       NET DIBAYARKAN
                                                  MORA TELEMATIKA INDONESIA, PT, Sewa
                                                  Colocation, Kabel Shaft, Colocation OTB 2U & Biaya
                                                  Interkoneksi antar Rak MMR periode 01.11.2022 -
1183   27-Mar-23    MANDIRI       1220011559559   30.11.2022                                                   9,265,000     8,500,000     935,000        170,000          9,265,000
                                                  PERHIMPUNAN PEMILIK DAN PENGHUNI SATUAN
                                                  RUMAH SUSUN HUNIAN DAN NON HUNIAN MAL &
                                                  KONDOMINIUM TAMAN ANGGREK, Biaya Sewa
                                                  Penempatan Perangkat Telekomunikasi di Mall &
                                                  Kondominium Taman Anggrek Berdasarkan Profit
1184   27-Mar-23    MANDIRI       1220011559559   Sharing Periode Februari 2023                               13,107,416    14,563,795          -       1,456,379         13,107,416
                                                  PGAS TELEKOMUNIKASI NUSANTARA, PT, Tagihan
                                                  Sewa IPLC Jakarta - Equinix Singapore periode Feb
1185   27-Mar-23    MANDIRI       1220011559559   2023                                                       359,710,000   330,010,000   36,300,000     6,600,000        359,710,000
                                                  SUMMARECON AGUNG, PT, Biaya atas Pemakaian
1186   27-Mar-23    MANDIRI       1220011559559   Listrik di The Springlake View periode Feb 2023               749,193       741,775       81,595         74,177           749,193
                                                  SUMMARECON AGUNG, PT, Biaya atas Pemakaian
                                                  Listrik di The Springlake Apartement periode Feb
1187   27-Mar-23    MANDIRI       1220011559559   2023                                                          529,294       524,053       57,646         52,405           529,294

                                                  ANGKASA PURA SUPPORT, PT, Pembayaran Tagihan
                                                  Listrik Angkasa pura untuk site M_335 area Kargo,
                                                  M_334 AP Bali -Kantor Imigrasi, M_331 AP Bali -Hotel
                                                  Haris, M_332 AP Bali-Area Parkir, dan M_333 AP Bali -
1188   28-Mar-23   MANDIRI IDR    1220011559559   Departure Area periode Jan 2022 - Jan 2023                   5,523,703     5,067,617     557,438        101,352          5,523,703
                                                  AMAZANA KENCANA, PT, Biaya atas Pemakaian
1189   28-Mar-23    MANDIRI       1220011559559   Listrik Apartemen Amazana Periode Feb 2023                    371,310       340,652       37,471          6,813           371,310
                                                  ANGKUT TEKNOLOGI INDONESIA, PT, Driver
                                                  Reimbursement Pengiriman Barang Melalui Aplikasi
1190   28-Mar-23       BCA         3193058058     Deliveree periode Feb 2023                                   5,415,826     5,415,826          -             -            5,415,826
                                                  BANGUNMUSTIKA INTIPERSADA, PT, Tagihan Sewa &
                                                  Service Charge Kantor Call Center & Acces Point Lt. 4
1191   28-Mar-23    MANDIRI       1220011559559   Cipulir periode Apr - Jun 2023                             202,925,160   200,916,000   22,100,760    20,091,600        202,925,160
                                                  BANGUNMUSTIKA INTIPERSADA, PT, Biaya atas
                                                  Pemakaian Listrik di ITC Cipulir Mas Lt. Dasar - LT. 4
1192   28-Mar-23    MANDIRI       1220011559559   periode 18 Jan 2022 - 17 Feb 2023                            1,266,361     1,407,067          -         140,706          1,266,361
                                                  BANGUNMUSTIKA INTIPERSADA, PT, Biaya atas
                                                  Pemakaian Listrik di ITC Cipulir Mas Lt 4/F.035 (IKR)
1193   28-Mar-23    MANDIRI       1220011559559   Periode 18 Januari 2023 - 17 Februari 2023                   2,006,253     2,229,170          -         222,917          2,006,253
                                                  BANGUNMUSTIKA INTIPERSADA, PT, Biaya atas
                                                  Pemakaian Listrik dan Air di ITC CIpulir Mas Lt.
                                                  4/B.071 (Call Center) Periode 18 Januari 2023 - 17
1194   28-Mar-23    MANDIRI       1220011559559   Februari 2023                                               11,498,985    12,776,649          -       1,277,664         11,498,985
                                                  BUMI MULIA PERKASA DEVELOPMENT, PT, Biaya atas
                                                  Pemakaian Listrik di Gedung Atrium Mulia periode
1195   28-Mar-23    MANDIRI       1220011559559   Feb 2023                                                      232,423       230,122       25,313         23,012           232,423
                                                  CENTRA SARANA DATA, PT, Tagihan Revenue Sharing
                                                  Bali Fiber di Gedung UOB Plaza (Chubb Square)
1196   28-Mar-23    MANDIRI       1220011559559   periode Juli - September 2022                                8,717,820     7,998,000     879,780        159,960          8,717,820
                                                  DAIDAN UTAMA PIALANG ASURANSI, PT, Biaya
                                                  Premi Asuransi PAR & EQ Renewal FTTH Part 3
1197   28-Mar-23       BCA         3193058058     periode 31 Des 2022 - 30 Nov 2023                            7,068,046     7,068,046          -             -            7,068,046
                                                  DONNELLY PARAMITA UTAMA, PT, Biaya atas
                                                  Pemakaian Listrik di Gedung Transavia Land/Graha
1198   28-Mar-23    MANDIRI       1220011559559   Paramita periode Februari 2023                                305,498       302,473       33,272         30,247           305,498
                                                  DWIBINA PRIMA, PT, Biaya atas Pemakaian Listrik di
1199   28-Mar-23    MANDIRI       1220011559559   Wisma BSG periode Feb 2023                                      86,330       85,475        9,402          8,547            86,330
                                                  GRAHA ARJANI AULIA DEKORTAMA, PT, Pembelian
                                                  Set alat Live Digital Campaign Marcom Periode
1200   28-Mar-23    MANDIRI       1220011559559   Desember 2022 Sebanyak 1 Pcs                                 6,271,500     5,650,000     621,500            -            6,271,500
                                                  GRAHA IRAMA, PT, Biaya atas Pemakaian Listrik di
                                                  Gedung Graha Irama periode 01 Feb 2022 - 01 Mar
1201   28-Mar-23    MANDIRI       1220011559559   2023                                                          130,185       144,649           -          14,464           130,185
                                                  GRIYA MURIA KENCANA, PT, Biaya atas Pemakaian
                                                  Listrik di Gedung Prince Center periode 26 Jan 2023 -
1202   28-Mar-23    MANDIRI       1220011559559   24 Feb 2023                                                   225,402       223,169       24,549         22,316           225,402
                                                  INDOSAT TBK, PT, Biaya Sewa Domestic Ethernet Link
                                                  (MPLS) MSC Gatsu Denpasar Bali to KPPTI Lt. 6
1203   28-Mar-23    MANDIRI       1220011559559   Jakarta periode Feb 2023                                   114,460,000   105,010,000   11,550,000     2,100,000        114,460,000

                                                  JAKARTA INTILAND, PT, Biaya atas Pemakaian Listrik
1204   28-Mar-23       BCA         3193058058     di Ramayana Karawang Periode Februari 2023                    575,188       569,494       62,643         56,949           575,188

                                                  JAKARTA INTILAND, PT, Biaya atas Pemakaian Listrik
1205   28-Mar-23       BCA         3193058058     di Ramayana Jatinegara Periode Februari 2023                  339,623       336,261       36,988         33,626           339,623
                                                  JAKARTA INTILAND, PT, Biaya atas Pemakaian Listrik
1206   28-Mar-23       BCA         3193058058     di Ramayana Karawang Periode Januari 2023                     637,360       631,050       69,415         63,105           637,360
                                                  KHARISMA INTAN PROPERTI, PT, Biaya atas
                                                  Pemakaian Listrik di Scientia Business Park periode
1207   28-Mar-23    MANDIRI       1220011559559   Feb 2023                                                      183,673       181,854       20,004         18,185           183,673
                                                  KRAKATAU SARANA PROPERTI, PT, Biaya atas
                                                  Pemakaian Listrik di Krakatau Steel Group periode
1208   28-Mar-23    MANDIRI       1220011559559   Jan 2023                                                        37,864       37,488        4,124          3,748            37,864

                                                  LIZA CHRISTINA GARMENT INDUSTRY, PT, Biaya atas
1209   28-Mar-23    MANDIRI       1220011559559   Pemakaian Listrik di Unity Building periode Feb 2023          505,000       500,000       55,000         50,000           505,000
                                                  MAKMUR ORIENT JAYA, PT, Biaya Kehandalan Atas
                                                  Pemakaian Listrik di Gedung Sentra Summarecon
                                                  Bekasi Ruang Panel BZ2 periode 13 Jan 2023 - 12 Feb
1210   28-Mar-23    MANDIRI       1220011559559   2023                                                          162,327       160,720       17,679         16,072           162,327
                                                  MAKMUR ORIENT JAYA, PT, Biaya Pemakaian Listrik
                                                  di Gedung Sentra Summarecon Bekasi Ruang Panel
1211   28-Mar-23    MANDIRI       1220011559559   BZ3 periode 13 Jan 2023 - 12 Feb 2023                         543,241       537,862       59,165         53,786           543,241
Page 77
      TANGGAL
    PENGELUARAN                 NOMOR REKENING
       DI BANK  REKENING BANK     BANK YANG                                                            NILAI MUTASI                NILAI YANG DIBAYARKAN
NO.  STATEMENT YANG DIGUNAKAN     DIGUNAKAN              NAMA VENDOR DAN KETERANGAN                       BANK         DPP         PPN             PPh       NET DIBAYARKAN

                                                 MAKMUR ORIENT JAYA, PT, Biaya Pemakaian Listrik
                                                 di Gedung Sentra Summarecon Bekasi Ruang Panel 1
1212   28-Mar-23   MANDIRI       1220011559559   Zona 1 periode 13 Jan 2023 - 12 Feb 2023                   324,059     320,850      35,294         32,085           324,059
                                                 MAKMUR ORIENT JAYA, PT, Biaya Pemakaian Listrik
                                                 di Gedung Sentra Summarecon Bekasi Parkir DTW
1213   28-Mar-23   MANDIRI       1220011559559   periode 13 Jan 2023 - 12 Feb 2023                          152,299     150,791      16,587         15,079           152,299

                                                 MAKMUR ORIENT JAYA, PT, Biaya Kehandalan Atas
                                                 Pemakaian Listrik di Gedung Sentra Summarecon
1214   28-Mar-23   MANDIRI       1220011559559   Bekasi Parkir DTW periode 13 Jan 2023 - 12 Feb 2023        104,727     103,690      11,406         10,369           104,727
                                                 MAKMUR ORIENT JAYA, PT, Biaya Kehandalan Atas
                                                 Pemakaian Listrik di Gedung Sentra Summarecon
                                                 Bekasi Ruang Panel 1 Zona 1 periode 13 Jan 2023 -
1215   28-Mar-23   MANDIRI       1220011559559   12 Feb 2023                                                135,128     133,790      14,717         13,379           135,128
                                                 MAKMUR ORIENT JAYA, PT, Biaya Kehandalan Atas
                                                 Pemakaian Listrik di Gedung Sentra Summarecon
                                                 Bekasi Ruang Panel BZ3 periode 13 Jan 2023 - 12 Feb
1216   28-Mar-23   MANDIRI       1220011559559   2023                                                       173,922     172,200      18,942         17,220           173,922
                                                 MAKMUR ORIENT JAYA, PT, Biaya Pemakaian Listrik
                                                 di Gedung Sentra Summarecon Bekasi Ruang Panel
1217   28-Mar-23   MANDIRI       1220011559559   BZ2 periode 13 Jan 2023 - 12 Feb 2023                      477,732     473,002      52,030         47,300           477,732
                                                 MENARA CAPITAL INDONUSA, PT, Biaya atas
                                                 Pemakaian Listrik Gedung Palma Tower lt. B1
1218   28-Mar-23   MANDIRI       1220011559559   periode Feb 2023                                           103,048     102,027      11,223         10,202           103,048
                                                 MENARA CAPITAL INDONUSA, PT, Biaya atas
                                                 Pemakaian Listrik Gedung Palma Tower lt. 11
1219   28-Mar-23   MANDIRI       1220011559559   periode Feb 2023                                           103,048     102,027      11,223         10,202           103,048
                                                 MENARA PRAMBANAN, PT, Biaya atas Pemakaian
                                                 Listrik di Apartement Poins Square periode Januari
1220   28-Mar-23   MANDIRI       1220011559559   2023                                                       239,538     266,153         -           26,615           239,538
                                                 MULIA CEMERLANG DIAN PERSADA, PT, Biaya atas
                                                 Pemakaian Listrik di Wisma GKBI periode Februari
1221   28-Mar-23   MANDIRI       1220011559559   2023                                                       501,371     496,406      54,605         49,640           501,371
                                                 MUSTIKA RATU CENTRE, PT, Biaya atas Pemakaian
                                                 Listrik di Gedung Mustika Ratu Centre periode Feb
1222   28-Mar-23   MANDIRI       1220011559559   2023                                                       173,966     172,243      18,947         17,224           173,966
                                                 NICO CENTRAL, PT, Biaya atas Pemakaian Listrik di
1223   28-Mar-23   MANDIRI       1220011559559   Gedung Sona Topas Tower Periode Feb 2023                   399,202     395,250      43,477         39,525           399,202
                                                 PENGELOLA LANDMARK PLUIT, PT, Biaya atas
                                                 Pemakaian Listrik Landmark Pluit (GF-D) periode 16
1224   28-Mar-23   MANDIRI       1220011559559   Januari 2022 - 15 Februari 2023                            122,139     120,929      13,302         12,092           122,139
                                                 PENGELOLA LANDMARK PLUIT, PT, Biaya atas
                                                 Pemakaian Listrik Landmark Pluit (GF-E) periode 16
1225   28-Mar-23   MANDIRI       1220011559559   Januari 2022 - 15 Februari 2023                            160,757     159,165      17,508         15,916           160,757
                                                 PENGELOLA LANDMARK PLUIT, PT, Biaya atas
                                                 Pemakaian Listrik Landmark Pluit (GF-B) periode 16
1226   28-Mar-23   MANDIRI       1220011559559   Januari 2022 - 15 Februari 2023                            135,113     133,775      14,715         13,377           135,113
                                                 PENGELOLA LANDMARK PLUIT, PT, Biaya atas
                                                 Pemakaian Listrik Landmark Pluit (GF-A) periode 16
1227   28-Mar-23   MANDIRI       1220011559559   Januari 2022 - 15 Februari 2023                            155,719     154,177      16,959         15,417           155,719
                                                 PENGELOLA PUSAT BELANJA, PT, Biaya atas
                                                 Pemakaian Listrik di Mall Bassura periode 16 Jan
1228   28-Mar-23   MANDIRI       1220011559559   2022 - 15 Feb 2023                                         925,190     916,030     100,763         91,603           925,190
                                                 PERHIMPUNAN PEMILIK DAN PENGHUNI SATUAN
                                                 RUMAH RUSUN SPAZIO, Biaya atas Pemakaian Listrik
                                                 & Admin di Rusun Spazio periode 21 Jan 2022 - 20
1229   28-Mar-23   MANDIRI       1220011559559   Feb 2023                                                   146,603     133,518      13,352           267            146,603
                                                 PERHIMPUNAN PEMILIK DAN PENGHUNI SATUAN
                                                 RUMAH SUSUN KOMERSIAL CAMPURAN
                                                 SEMENTARA APARTEMENT SATU8 RESIDENCE,
                                                 Tagihan Revenue Sharing Bali Fiber di Apartement
1230   28-Mar-23   MANDIRI       1220011559559   Satu8 Periode Oktober - Desember 2022                     1,135,354   1,158,524        -           23,170         1,135,354
                                                 PLAZA INDONESIA REALTY TBK, PT, Biaya atas
                                                 Pemakaian Listrik di Plaza Indonesia periode Feb
1231   28-Mar-23   MANDIRI       1220011559559   2023                                                       522,403     517,231      56,895         51,723           522,403
                                                 POWER TELECOM, PT, Biaya Sewa Dark Fiber Section
                                                 25 3.965KM Pasirjaya-001 - Paledang-001 periode
1232   28-Mar-23    BCA           3193058058     Mar 2023                                                  3,025,295   2,775,500    305,305         55,510         3,025,295
                                                 POWER TELECOM, PT, Sewa Dark Fiber Section 29
                                                 1.359KM Tanah Baru-007 - Tegalgundil-010 periode
1233   28-Mar-23    BCA           3193058058     Mar 2023                                                  1,036,154    950,600     104,566         19,012         1,036,154
                                                 POWER TELECOM, PT, Sewa Dark Fiber Segmen 11
                                                 (2.037KM) dan (2.038KM) Tegal Gundil-010 - Tanah
                                                 Sareal-005, Section 10 (2.830KM) & (2.831KM)
1234   28-Mar-23    BCA           3193058058     Narasoma - Tanah Sareal-005 periode Mar 2023              3,714,284   3,407,600    374,836         68,152         3,714,284
                                                 POWER TELECOM, PT, Biaya Sewa Dark Fiber Section
                                                 26 2.270KM Cikaret-001 - Pasir Jaya-001 periode Mar
1235   28-Mar-23    BCA           3193058058     2023                                                      1,732,010   1,589,000    174,790         31,780         1,732,010
                                                 POWER TELECOM, PT, Biaya Sewa Dark Fiber 2core
                                                 segmen HH Jl. Raya Serpong - HH Apartement
1236   28-Mar-23    BCA           3193058058     Amazana Residence periode Mar 2023                        6,356,880   5,832,000    641,520        116,640         6,356,880
                                                 POWER TELECOM, PT, Biaya Sewa Dark Fiber 4core
                                                 segmen Mall Karawang - Karawang Regency periode
1237   28-Mar-23    BCA           3193058058     Mar 2023                                                  9,679,200   8,880,000    976,800        177,600         9,679,200
                                                 PPPSRS PERKANTORAN EKSEKUTIF SATRIO TOWER,
                                                 Biaya atas Pemakaian Listrik di Gedung Satrio Tower
1238   28-Mar-23   MANDIRI       1220011559559   periode Februari 2023                                      201,830     199,832      21,981         19,983           201,830
                                                 PPPSRSS SAHID SUDIRMAN CENTER, Biaya atas
                                                 Pemakaian Listrik di Sahid Sudirman Centre Lt. 29
1239   28-Mar-23   MANDIRI       1220011559559   periode 21 Jan 2023 - 20 Feb 2023                          215,843     213,706      23,507         21,370           215,843
                                                 PPPSRSS SAHID SUDIRMAN CENTER, Biaya atas
                                                 Pemakaian Listrik di Sahid Sudirman Centre Lt. 46
1240   28-Mar-23   MANDIRI       1220011559559   periode 21 Jan 2023 - 20 Feb 2023                          215,843     213,706      23,507         21,370           215,843
Page 78
      TANGGAL
    PENGELUARAN                   NOMOR REKENING
       DI BANK  REKENING BANK       BANK YANG                                                              NILAI MUTASI                  NILAI YANG DIBAYARKAN
NO.  STATEMENT YANG DIGUNAKAN       DIGUNAKAN                NAMA VENDOR DAN KETERANGAN                       BANK          DPP          PPN             PPh       NET DIBAYARKAN
                                                   PPPSRSS SAHID SUDIRMAN CENTER, Biaya atas
                                                   Pemakaian Listrik di Sahid Sudirman Centre Lt. 11
1241   28-Mar-23     MANDIRI       1220011559559   periode 21 Jan 2023 - 20 Feb 2023                            232,553       230,251      25,327         23,025           232,553
                                                   PUALAM KENCANA GEMILANG JAKARTA, PT, Biaya
                                                   atas Pemakaian Listrik di Gedung Perwata Tower
1242   28-Mar-23     MANDIRI       1220011559559   periode 26 Jan 2023 - 23 Feb 2023                            602,752       596,784      65,646         59,678           602,752
                                                   PUALAM KENCANA GEMILANG JAKARTA, PT, Biaya
                                                   atas Pemakaian Listrik di Gedung Perwata Tower
1243   28-Mar-23     MANDIRI       1220011559559   periode 24 Dec 2022 - 25 Jan 2023                            640,180       633,842      69,722         63,384           640,180
                                                   PURIAMPERA INTIPRATAMA, PT, Biaya atas
                                                   Pemakaian Listrik di Gedung Ad Premier Periode Feb
1244   28-Mar-23     MANDIRI       1220011559559   2023                                                         223,506       221,293      24,342         22,129           223,506
                                                   SAINATH REALINDO, PT, Biaya atas Pemakaian Listrik
1245   28-Mar-23     MANDIRI       1220011559559   di Gedung Sainath Tower periode Feb 2023                       81,331       90,367          -           9,036            81,331
                                                   SERPONG CIPTA KREASI, PT, Biaya atas Pemakaian
                                                   Listrik di Plaza Summarecon Serpong periode Feb
1246   28-Mar-23     MANDIRI       1220011559559   2023                                                         989,876       980,075     107,808         98,007           989,876
                                                   SUGIH BERKAT, PT, Biaya atas Pemakaian Listrik di
                                                   Gedung Menara Citicon periode 27 Januari 2023 - 26
1247   28-Mar-23     MANDIRI       1220011559559   Februari 2023                                                707,000       700,000      77,000         70,000           707,000
                                                   SUMMARECON AGUNG, PT, Biaya atas Pemakaian
1248   28-Mar-23       BCA          3193058058     Listrik di The Kensington periode Februari 2023              213,069       210,959      23,205         21,095           213,069
                                                   TOKOPEDIA, PT, Biaya Pembelian material Box
                                                   Container sebanyak 20 box untuk kebutuhan
1249   28-Mar-23     MANDIRI       1220011559559   operasional FTTX                                            4,139,600     4,139,600         -             -            4,139,600

                                                   TRI PURA INDAH PERSADA, PT, Biaya atas Pemakaian
1250   28-Mar-23     MANDIRI       1220011559559   Listrik Gd. Wirausaha Kuningan Periode Feb 2023              259,973       257,398      28,314         25,739           259,973
                                                   WIJAYA KARYA REALTY, PT, Biaya atas Pemakaian
                                                   Listrik di Gedung Tamansari Parama Periode 01
1251   28-Mar-23     MANDIRI       1220011559559   Februari 2023 - 28 Februari 2023                            1,206,697     1,231,323         -          24,626          1,206,697

                                                   BINAJASA SUMBER SARANA, PT, Reimbursement
1252   29-Mar-23     MANDIRI       1220011559559   Insentif Outsource Div. Direct Sales Periode Jan 2023      37,069,185    36,823,693    300,045         54,553         37,069,185

                                                   BINAJASA SUMBER SARANA, PT, Reimbursement
1253   29-Mar-23     MANDIRI       1220011559559   Salary Outsource Div. Direct Sales Periode Feb 2023        86,734,990    86,160,586    702,049        127,645         86,734,990
                                                   CHINA MOBILE INTERNATIONAL LTD, IP Transit
1254   29-Mar-23   SINARMAS USD     0000670707     Equinix SG 20Mbps Periode Feb 2023                          7,214,030     7,214,030         -             -            7,214,030
                                                   CHINA MOBILE INTERNATIONAL LTD, IP Transit
1255   29-Mar-23   SINARMAS USD     0000670707     Equinix SG 20Mbps Periode Jan 2023                          7,214,030     7,214,030         -             -            7,214,030
                                                   CHINA MOBILE INTERNATIONAL LTD, IP Transit
1256   29-Mar-23   SINARMAS USD     0000670707     Equinix SG 50Mbps Periode Jan 2023                         10,007,548    10,007,548         -             -           10,007,548
                                                   CHINA MOBILE INTERNATIONAL LTD, IP Transit
1257   29-Mar-23   SINARMAS USD     0000670707     Equinix SG 50Mbps Periode Feb 2023                         10,007,548    10,007,548         -             -           10,007,548
                                                   DANAMAS INSAN KREASI ANDALAN, PT,
                                                   Reimbursement Salary Outsource Div. Direct Sales
1258   29-Mar-23     MANDIRI       1220011559559   Periode Feb 2023 dan Insentif Periode Jan 2023             83,638,531    83,084,633    676,986        123,088         83,638,531
                                                   EQUINIX SINGAPORE PTE LTD, Biaya Sewa Rack
                                                   Colocation dan Interkoneksi Equinix Singapore
1259   29-Mar-23    SINARMAS        0000240408     periode Feb 2023                                          109,555,146   109,555,146         -             -          109,555,146
                                                   TELIA CARRIER SINGAPORE PTE LTD, Biaya Sewa Telia
1260   29-Mar-23   SINARMAS USD     0000670707     IP Transit 3Gbps Periode Feb 2023                          36,837,600    36,837,600         -             -           36,837,600

                                                   TRIMITRA PUTRA MANDIRI, PT, Reimbursement
1261   29-Mar-23     MANDIRI       1220011559559   Salary Outsource Div. Direct Sales Periode Feb 2023       133,365,667   132,482,450   1,079,487       196,270        133,365,667

                                                   TRIMITRA PUTRA MANDIRI, PT, Reimbursement
1262   29-Mar-23     MANDIRI       1220011559559   Insentif Outsource Div. Direct Sales Periode Jan 2023      26,294,002    26,119,869    212,829         38,696         26,294,002
                                                   PLN PERSERO, PT, Biaya pembelian token PLN di 11
1263   30-Mar-23    SINARMAS        00002999994    Site KWH prabayar pemakaian bulan April 2023               12,447,500    12,447,500         -             -          12,447,500
                                                   ANGKUT TEKNOLOGI INDONESIA, PT, Biaya
                                                   Pengiriman Barang Melalui Aplikasi Deliveree
1264   30-Mar-23       BCA          3193058058     periode Feb 2023                                            1,278,978     1,173,374    129,071         23,467          1,278,978
                                                   CYBERINDO ADITAMA, PT, Biaya Crossconnect FO
                                                   CBN Tenant PT Keb Hana Bank KCP Central Park
1265   30-Mar-23       BCA         1220011559559   Bulan Feb 2023                                              3,052,000     3,052,000         -             -            3,052,000
                                                   DATAMEDIA MAKMUR PRATAMA, PT, Biaya Layanan
                                                   Content TV 42 Channel untuk Tenant RS Atma Jaya
1266   30-Mar-23     MANDIRI       1220011559559   Pluit periode Mar 2023                                     12,740,000    13,000,000         -         260,000         12,740,000
                                                   FIBER NETWORKS INDONESIA, PT, Sewa Local Loop
                                                   30 Mbps - Pergudangan Puninar Yusen Periode Mar
1267   30-Mar-23     MANDIRI       1220011559559   2023                                                        4,360,000     4,000,000    440,000         80,000          4,360,000
                                                   INDONESIA COMNETS PLUS, PT, Sewa Local Loop 5
                                                   Mbps Diskominfo Kab. Purwakarta Warudoyong -
                                                   Dinas Cipta Karya, Pertigaan Wanayasa, Pertigaan
                                                   Cianting, Situ Wanayasa, 15 Mbps site Nageri Kidul-
1268   30-Mar-23     MANDIRI       1220011559559   004 periode Feb 2023                                       11,940,403    10,954,497   1,204,995       219,089         11,940,403
                                                   INDONESIA COMNETS PLUS, PT, Sewa Local Loop 5
                                                   Mbps Diskominfo Kab. Purwakarta Warudoyong -
                                                   Dinas Cipta Karya, Pertigaan Wanayasa, Pertigaan
                                                   Cianting, Situ Wanayasa, 15 Mbps site Nageri Kidul-
1269   30-Mar-23     MANDIRI       1220011559559   004 periode Jan 2023                                       12,515,929    11,482,504   1,263,075       229,650         12,515,929
                                                   INTERNETINDO DATA CENTRA INDONESIA, PT,
                                                   Tagihan Kelebihan Pemakaian Listrik Rack No Winter
1270   30-Mar-23     MANDIRI       1220011559559   233 Per 1 - 28 Feb 2023 (IDC Indonesia)                    10,682,000     9,800,000   1,078,000       196,000         10,682,000
                                                   INTERNETINDO DATA CENTRA INDONESIA, PT, Biaya
                                                   Sewa Penambahan Redundant Power Source Rack
1271   30-Mar-23     MANDIRI       1220011559559   Winter 233 periode Mar 2023                                 2,180,000     2,000,000    220,000         40,000          2,180,000

                                                   INTILAND DEVELOPMENT TBK, PT (SURABAYA), Sewa
                                                   Penempatan Perangkat Telekomunikasi Server MMR
1272   30-Mar-23     MANDIRI       1220011559559   B1 di Gedung Intiland periode Mar 2023                      4,040,000     4,000,000    440,000        400,000          4,040,000
Page 79
      TANGGAL
    PENGELUARAN                  NOMOR REKENING
       DI BANK  REKENING BANK      BANK YANG                                                             NILAI MUTASI                 NILAI YANG DIBAYARKAN
NO.  STATEMENT YANG DIGUNAKAN      DIGUNAKAN              NAMA VENDOR DAN KETERANGAN                        BANK         DPP          PPN             PPh       NET DIBAYARKAN
                                                  JALA LINTAS MEDIA, PT, Sewa Local Loop 10 Mbps &
                                                  20 Mbps Tenant Citeureup dan Gunung Putri (VLAN)
1273   30-Mar-23      MANDIRI     1220011559559   periode Feb 2023                                           9,265,000    8,500,000    935,000        170,000         9,265,000

                                                  LINK NET TBK, PT, Sewa Crossconnect 10 Mbps Fiber
1274   30-Mar-23        BCA        3193058058     Optic Tenant PT. Bank Keb Hana periode Feb 2023            2,725,000    2,500,000    275,000         50,000         2,725,000
                                                  LINK NET TBK, PT, Sewa Crossconnect 35 Mbps dari
                                                  Omadata Wisma Dharmala Intiland Local Loop (PO
1275   30-Mar-23        BCA        3193058058     Tenant Intiland) periode Feb 2023                          9,810,000    9,000,000    990,000        180,000         9,810,000
                                                  MEDIA NUSANTARA DATA GLOBAL, PT, Sewa Full
1276   30-Mar-23      MANDIRI     1220011559559   Rack Server Cabinet 45U periode Feb 2023                  10,900,000   10,000,000   1,100,000       200,000        10,900,000
                                                  MEDIA NUSANTARA DATA GLOBAL, PT, Biaya Sewa
1277   30-Mar-23      MANDIRI     1220011559559   Penempatan OTB Fiber in NER periode Feb 2023               2,180,000    2,000,000    220,000         40,000         2,180,000
                                                  MEDIA SOLUSI NETWORK, PT, Biaya Instalasi & Sewa
1278   30-Mar-23      MANDIRI     1220011559559   Link Metro-E site Bapenda Kota Bandung                    58,782,143   53,928,571   5,932,143     1,078,571        58,782,143
                                                  MOXCAL TEKNOLOGI, PT, Tagihan Sewa Modul
                                                  Aplikasi Call Center Centerix periode 17 Feb 2023 -
1279   30-Mar-23      MANDIRI     1220011559559   16 Mar 2023 (Additional 10qty)                            10,900,000   10,000,000   1,100,000       200,000        10,900,000
                                                  MOXCAL TEKNOLOGI, PT, Tagihan Sewa Modul
                                                  Aplikasi Call Center Centerix periode Mar 2023
1280   30-Mar-23      MANDIRI     1220011559559   (Additional 10qty)                                        10,900,000   10,000,000   1,100,000       200,000        10,900,000
                                                  MOXCAL TEKNOLOGI, PT, Tagihan Sewa Modul
                                                  Aplikasi Call Center Centerix periode Mar 2023
1281   30-Mar-23      MANDIRI     1220011559559   (Additional 5qty)                                          5,450,000    5,000,000    550,000        100,000         5,450,000
                                                  MOXCAL TEKNOLOGI, PT, Tagihan Sewa Modul
1282   30-Mar-23      MANDIRI     1220011559559   Aplikasi Call Center Centerix periode Mar 2023            10,900,000   10,000,000   1,100,000       200,000        10,900,000
                                                  MOXCAL TEKNOLOGI, PT, Jasa Whatsapp Service API
1283   30-Mar-23      MANDIRI     1220011559559   Client periode 15 Mar 2023 - 14 Apr 2023                    654,000      600,000      66,000         12,000           654,000
                                                  NTT INDONESIA, PT, Sewa Crossconnect Establish
                                                  NTT Ether 150 Mbps At Cargill Level 26 W 46 periode
1284   30-Mar-23      MANDIRI     1220011559559   Feb 2023                                                  14,715,000   13,500,000   1,485,000       270,000        14,715,000

                                                  POWER TELECOM, PT, Biaya Sewa Dark Fiber Section
                                                  20 (2.562KM) Kedungbadak-008 - Tanah sareal-005,
                                                  Section 12 (1.780KM) Kencana-001 - Tanah Sareal-
                                                  005, Section 16 (1KM) Tanah Sareal-002 - Tanah
1285   30-Mar-23        BCA        3193058058     Sareal-005, Section 17 (6.090KM) periode Mar 2023         10,203,981    9,361,450   1,029,760       187,229        10,203,981
                                                  POWER TELECOM, PT, Biaya Sewa Dark Fiber 2Core
                                                  Segmen Tangerang HH Plaza SumMarecon - HH
                                                  Teknovatus, HH Teknovatus - MP Pondok Pinang
1286   30-Mar-23        BCA        3193058058     periode Mar 2023                                          20,339,400   18,660,000   2,052,600       373,200        20,339,400
                                                  PRIMACOM INTERBUANA, PT, Sewa Local Loop 25
                                                  Mbps Diskominfo Kota Bandung CCTV sebanyak 54
1287   30-Mar-23      MANDIRI     1220011559559   Titik periode Feb 2023                                    58,860,000   54,000,000   5,940,000     1,080,000        58,860,000
                                                  PRIMACOM INTERBUANA, PT, Sewa Local Loop 25
                                                  Mbps Diskominfo Kota Bandung CCTV sebanyak 54
1288   30-Mar-23      MANDIRI     1220011559559   Titik periode Jan 2023                                    58,860,000   54,000,000   5,940,000     1,080,000        58,860,000
                                                  SERPONG MAS TELEMATIKA, PT, Biaya Sewa Core FO
                                                  2 core HH Pos Polisi - German Center periode Jan
1289   30-Mar-23      MANDIRI     1220011559559   2023                                                       1,635,000    1,500,000    165,000         30,000         1,635,000
                                                  SERPONG MAS TELEMATIKA, PT, Sewa Local Loop
                                                  Dedicated dan Broadband West BSD untuk 45 Tenant
1290   30-Mar-23      MANDIRI     1220011559559   periode Des 2022                                          62,648,840   57,476,000   6,322,360     1,149,520        62,648,840
                                                  SMART TELECOM, PT, Tagihan Telepon Divisi Call
                                                  Center, Marketing & Communications dan FTTx Opr
1291   30-Mar-23      MANDIRI     1220011559559   Bulan Feb 2023                                              162,460      146,360      16,100            -             162,460
                                                  TECHNOLOGY DATA INDONESIA, PT, Biaya Sewa Rack
                                                  Summer 243 IDC Duren Tiga (Colocation 1/2 Rack)
1292   30-Mar-23      MANDIRI     1220011559559   Periode 1 s/d 31 Mar 2023                                  7,630,000    7,000,000    770,000        140,000         7,630,000
                                                  TEKNOVATUS SOLUSI SEJAHTERA, PT, Sewa
                                                  Colocation Rack & MMR Connect untuk Tenant PT
                                                  Wirecard Technologies Indonesia periode 01 - 28 Feb
1293   30-Mar-23      MANDIRI     1220011559559   2023                                                       6,022,250    5,525,000    607,750        110,500         6,022,250
                                                  TEKNOVATUS SOLUSI SEJAHTERA, PT, Biaya Sewa
                                                  MMR Switch ISP to Rack Bali Tower Periode 01 - 28
1294   30-Mar-23      MANDIRI     1220011559559   Feb 2023                                                    635,834      583,333      64,167         11,666           635,834
                                                  TELEKOMUNIKASI SELULAR, PT, Biaya Pascabayar
                                                  Paket Data Mikrotik Regional Jawa Timur Periode
                                                  Maret 2023 dengan nomor virtual account mandiri
1295   30-Mar-23      MANDIRI     1220011559559   880445190587647                                             582,750      525,000      57,750            -             582,750
                                                  TOWER BERSAMA, PT, Sewa Local Loop Metro E 100
                                                  Mbps Kawasan Nusa Dua Bali (Tower Bersama
1296   30-Mar-23      MANDIRI     1220011559559   Group) periode 24 Mar 2023 - 23 Apr 2023                   9,374,000    8,600,000    946,000        172,000         9,374,000
          30-Mar-23                               CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                  Material Relokasi Jl. Pulomas Utara dari PT Prysmian
1297                  MANDIRI     1220011559559   Cable ke PT Arkon Global Indonesia                          594,600      600,000       6,600         12,000           594,600
         30-Mar-23                                CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                  Material Kabel Duct 32 Core dari WH Serpong ke PT
1298                  MANDIRI     1220011559559   Prabakara Usahatama                                         495,500      500,000       5,500         10,000           495,500
         30-Mar-23                                CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                  Material Kabel dari PT Furukawa Optical ke PT
1299                  MANDIRI     1220011559559   Andalan Kreatif Utama                                       495,500      500,000       5,500         10,000           495,500
                                                  BIBIT, Mr, Biaya Perbaikan FO Cut TT.I0308-006 FO
                                                  link DPS_02 to MCP Sukawati_002 Jln. Raya
                                                  Batubulan Gianyar) (PO Rp.2.111.175,- Potongan PPh
1300   30-Mar-23      SINARMAS     00002999994    21(3%) Rp.63.335,25,-)                                     2,047,840    2,111,175         -          63,335         2,047,840
                                                  BIBIT, Mr, Biaya Perbaikan FO Cut TT.I0307-003,
                                                  I00307-002 FO Link Site_16 to Site_07 Jln. Uluwatu,
                                                  Ungasan - Badung) (PO Rp.2.360.400,- Potongan PPh
1301   30-Mar-23      SINARMAS     00002999994    21(3%) Rp.70.812,- )                                       2,289,588    2,360,400         -          70,812         2,289,588

                                                  IMAM TAUFIK, Biaya Perbaikan FO Cut TT.I0311-007
                                                  FO Link BLL_08 to BLL_16 Pegayaman Buleleng) (PO
1302   30-Mar-23      SINARMAS     00002999994    Rp.2.328.225,- Potongan PPh 21(3%) Rp.69.846.76,- )        2,258,378    2,328,225         -          69,847         2,258,378
Page 80
      TANGGAL
    PENGELUARAN                  NOMOR REKENING
       DI BANK  REKENING BANK      BANK YANG                                                             NILAI MUTASI                NILAI YANG DIBAYARKAN
NO.  STATEMENT YANG DIGUNAKAN      DIGUNAKAN              NAMA VENDOR DAN KETERANGAN                        BANK         DPP         PPN             PPh       NET DIBAYARKAN
                                                  BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
                                                  Penarikan Kabel FO Cut Impact Tertabrak Truck site
1303   30-Mar-23    MANDIRI       1220011559559   Cipinang Besar Utara-001                                   1,997,766   2,159,747        -          161,981         1,997,766

                                                  BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
                                                  Penarikan Kabel FO Cut Impact Kerusakan Oknum
1304   30-Mar-23    MANDIRI       1220011559559   site MP Kelapa Gading Barat-001                            1,448,686   1,566,147        -          117,461         1,448,686
                                                  BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
                                                  Penarikan Kabel FO Cut Impact Penebangan Pohon
1305   30-Mar-23    MANDIRI       1220011559559   site MP Tugu Utara-001                                     1,560,426   1,686,947        -          126,521         1,560,426
                                                  DITJEN POSTEL, BHP Frekuensi Radio Periode 26 Apr
                                                  2023 s.d 25 Apr 2024 - No. Aplikasi :
1306   03-Apr-23   MANDIRI IDR    1220011559559   02360365042021                                             7,569,868   7,569,868        -              -           7,569,868
                                                  DITJEN POSTEL, BHP Frekuensi Radio Periode 26 Apr
                                                  2023 s.d 25 Apr 2024 - No. Aplikasi :
1307   03-Apr-23   MANDIRI IDR    1220011559559   02360366042021                                             7,569,868   7,569,868        -              -           7,569,868
                                                  DITJEN POSTEL, BHP Frekuensi Radio Periode 26 Apr
                                                  2023 s.d 25 Apr 2024 - No. Aplikasi :
1308   03-Apr-23   MANDIRI IDR    1220011559559   02360367042021                                             7,569,868   7,569,868        -              -           7,569,868
                                                  DITJEN POSTEL, BHP Frekuensi Radio Periode 26 Apr
                                                  2023 s.d 25 Apr 2024 - No. Aplikasi :
1309   03-Apr-23   MANDIRI IDR    1220011559559   02360368042021                                             7,569,868   7,569,868        -              -           7,569,868
                                                  DITJEN POSTEL, BHP Frekuensi Radio Periode 19 Apr
                                                  2023 s.d 18 Apr 2024 - No. Aplikasi :
1310   03-Apr-23   MANDIRI IDR    1220011559559   02356874042021                                             9,900,574   9,900,574        -              -           9,900,574
                                                  DITJEN POSTEL, BHP Frekuensi Radio Periode 19 Apr
                                                  2023 s.d 18 Apr 2024 - No. Aplikasi :
1311   03-Apr-23   MANDIRI IDR    1220011559559   02356875042021                                             7,102,692   7,102,692        -              -           7,102,692
                                                  DITJEN POSTEL, BHP Frekuensi Radio Periode 19 Apr
                                                  2023 s.d 18 Apr 2024 - No. Aplikasi :
1312   03-Apr-23   MANDIRI IDR    1220011559559   02356876042021                                             7,077,295   7,077,295        -              -           7,077,295
                                                  DITJEN POSTEL, BHP Frekuensi Radio Periode 19 Apr
                                                  2023 s.d 18 Apr 2024 - No. Aplikasi :
1313   03-Apr-23   MANDIRI IDR    1220011559559   02356878042021                                             9,862,220   9,862,220        -              -           9,862,220
                                                  DITJEN POSTEL, BHP Frekuensi Radio Periode 19 Apr
                                                  2023 s.d 18 Apr 2024 - No. Aplikasi :
1314   03-Apr-23   MANDIRI IDR    1220011559559   02356880042021                                             9,862,220   9,862,220        -              -           9,862,220

                                                  DITJEN POSTEL, BHP Frekuensi Radio Periode 15 Apr
1315   03-Apr-23   MANDIRI IDR    1220011559559   2023 s.d 14 Apr 2024 - No. Aplikasi : 022540032015         7,012,504   7,012,504        -              -           7,012,504

                                                  DITJEN POSTEL, BHP Frekuensi Radio Periode 15 Apr
1316   03-Apr-23   MANDIRI IDR    1220011559559   2023 s.d 14 Apr 2024 - No. Aplikasi : 022539032015         7,012,504   7,012,504        -              -           7,012,504

                                                  DITJEN POSTEL, BHP Frekuensi Radio Periode 07 Apr
1317   03-Apr-23   MANDIRI IDR    1220011559559   2023 s.d 06 Apr 2024 - No. Aplikasi : 022829032016         9,897,468   9,897,468        -              -           9,897,468

                                                  DITJEN POSTEL, BHP Frekuensi Radio Periode 07 Apr
1318   03-Apr-23   MANDIRI IDR    1220011559559   2023 s.d 06 Apr 2024 - No. Aplikasi : 022827032016         7,501,452   7,501,452        -              -           7,501,452

                                                  DITJEN POSTEL, BHP Frekuensi Radio Periode 07 Apr
1319   03-Apr-23   MANDIRI IDR    1220011559559   2023 s.d 06 Apr 2024 - No. Aplikasi : 022830032016         9,897,468   9,897,468        -              -           9,897,468

                                                  DITJEN POSTEL, BHP Frekuensi Radio Periode 07 Apr
1320   03-Apr-23   MANDIRI IDR    1220011559559   2023 s.d 06 Apr 2024 - No. Aplikasi : 022828032016         7,501,452   7,501,452        -              -           7,501,452
                                                  DITJEN POSTEL, BHP Frekuensi Radio Periode 19 Apr
                                                  2023 s.d 18 Apr 2024 - No. Aplikasi :
1321   03-Apr-23   MANDIRI IDR    1220011559559   02356872042021                                             9,900,574   9,900,574        -              -           9,900,574

                                                  DITJEN POSTEL, BHP Frekuensi Periode 9 Maret 2023
1322   03-Apr-23   MANDIRI IDR    1220011559559   s.d 8 Maret 2024 - No. Aplikasi : 02805682032023           9,891,252   9,891,252        -              -           9,891,252

                                                  DITJEN POSTEL, BHP Frekuensi Periode 8 Maret 2023
1323   03-Apr-23   MANDIRI IDR    1220011559559   s.d 7 Maret 2024 - No. Aplikasi : 02805463032023           9,891,252   9,891,252        -              -           9,891,252
                                                  DITJEN POSTEL, BHP Frekuensi Radio Periode 26 Apr
                                                  2023 s.d 25 Apr 2024 - No. Aplikasi :
1324   03-Apr-23   MANDIRI IDR    1220011559559   02360370042021                                             7,569,868   7,569,868        -              -           7,569,868
                                                  DITJEN POSTEL, BHP Frekuensi Radio Periode 26 Apr
                                                  2023 s.d 25 Apr 2024 - No. Aplikasi :
1325   03-Apr-23   MANDIRI IDR    1220011559559   02360373042021                                             7,569,868   7,569,868        -              -           7,569,868
                                                  DITJEN POSTEL, BHP Frekuensi Radio Periode 19 Apr
                                                  2023 s.d 18 Apr 2024 - No. Aplikasi :
1326   03-Apr-23   MANDIRI IDR    1220011559559   02356873042021                                             9,900,574   9,900,574        -              -           9,900,574
                                                  DITJEN POSTEL, BHP Frekuensi Radio Periode 26 Apr
                                                  2023 s.d 25 Apr 2024 - No. Aplikasi :
1327   03-Apr-23   MANDIRI IDR    1220011559559   02360372042021                                             7,569,868   7,569,868        -              -           7,569,868
                                                  ALPHA CIPTA COMPUTINDO, PT, Pembelian Cable
1328   04-Apr-23   MANDIRI IDR    1220011559559   UTP Cat 5E Straight Belden Sebanyak 1.220 Mtr              6,549,000   5,900,000    649,000            -           6,549,000
                                                  ALPHA CIPTA COMPUTINDO, PT, Pembelian Cable
1329   04-Apr-23   MANDIRI IDR    1220011559559   Network UTP Cat 5E Sebanyak 915 MTR                        4,945,050   4,455,000    490,050            -           4,945,050
                                                  ALPHA CIPTA COMPUTINDO, PT, Pembelian Cable
1330   04-Apr-23   MANDIRI IDR    1220011559559   UTP Cat 5E Straight Belden Sebanyak 610 Mtr                3,274,500   2,950,000    324,500            -           3,274,500
                                                  ARYAVENTURA REALTY, PT, Biaya atas Pemakaian
1331   04-Apr-23   MANDIRI IDR    1220011559559   Listrik di Gedung Aryaventura periode Feb 2023              188,682     186,814      20,549         18,681           188,682
                                                  BALI UTAMA CAKRAWALA, PT, Biaya atas Pemakaian
                                                  Listrik di Gedung Discovery Shopping Mall Periode 29
1332   04-Apr-23   MANDIRI IDR    1220011559559   Jan 2023 - 28 Feb 2023                                      187,523     185,667      20,422         18,566           187,523
                                                  CITRA KIRANA HIJAU RETAIL, PT, Biaya atas
                                                  Pemakaian Listrik di Gedung Green Sedayu Mall
1333   04-Apr-23   MANDIRI IDR    1220011559559   General 1 BSM periode Feb 2023                                98,802     90,643       9,971          1,812            98,802
                                                  CITRA KIRANA HIJAU RETAIL, PT, Biaya atas
                                                  Pemakaian Listrik di Gedung Green Sedayu Mall
1334   04-Apr-23   MANDIRI IDR    1220011559559   General 4 Lt.2 periode Feb 2023                             243,134     223,059      24,536          4,461           243,134
Page 81
      TANGGAL
    PENGELUARAN                     NOMOR REKENING
       DI BANK  REKENING BANK         BANK YANG                                                            NILAI MUTASI                   NILAI YANG DIBAYARKAN
NO.  STATEMENT YANG DIGUNAKAN         DIGUNAKAN                 NAMA VENDOR DAN KETERANGAN                    BANK          DPP           PPN             PPh       NET DIBAYARKAN
                                                      CITRA KIRANA HIJAU RETAIL, PT, Biaya atas
                                                      Pemakaian Listrik di Gedung Green Sedayu Mall
1335   04-Apr-23     MANDIRI IDR      1220011559559   General 3 Lt.1 periode Feb 2023                           393,702       361,194       39,731          7,223           393,702
                                                      CITRA KIRANA HIJAU RETAIL, PT, Biaya atas
                                                      Pemakaian Listrik di Gedung Green Sedayu Mall
1336   04-Apr-23     MANDIRI IDR      1220011559559   General 2 Lt.GF periode Feb 2023                          431,719       396,072       43,568          7,921           431,719
                                                      CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                      Material Kabel dari PT Furukawa Optical ke PT Bayu
1337   04-Apr-23     MANDIRI IDR      1220011559559   Manunggal Sejahtera                                       495,500       500,000        5,500         10,000           495,500
                                                      DUNIA MAKMUR PROPERTI, PT, Biaya atas
                                                      Pemakaian Listrik di Plaza Summarecon Bekasi
1338   04-Apr-23     MANDIRI IDR      1220011559559   Periode Jan 2023                                          748,965       741,549       81,570         74,154           748,965
                                                      DUNIA MAKMUR PROPERTI, PT, Biaya atas
                                                      Pemakaian Listrik di Plaza Summarecon Bekasi
1339   04-Apr-23     MANDIRI IDR      1220011559559   Periode Feb 2023                                          838,660       830,356       91,339         83,035           838,660
                                                      INTILAND DEVELOPMENT TBK, PT (JAKARTA), Biaya
                                                      atas Pemakaian Listrik di Gedung Intiland Jakarta
1340   04-Apr-23     MANDIRI IDR      1220011559559   periode 26 Jan 2023 - 25 Feb 2023                         567,665       630,738           -          63,073           567,665
                                                      INTILAND DEVELOPMENT TBK, PT (SURABAYA), Biaya
                                                      Admin atas Pemakaian Listrik di Gedung Intiland
1341   04-Apr-23     MANDIRI IDR      1220011559559   Surabaya periode Feb 2023                                   70,783       70,082        7,709          7,008            70,783
                                                      INTILAND DEVELOPMENT TBK, PT (SURABAYA), Biaya
                                                      atas Pemakaian Listrik di Gedung Intiland Surabaya
1342   04-Apr-23     MANDIRI IDR      1220011559559   periode Feb 2023                                          630,742       700,824           -          70,082           630,742
                                                      LESTARI MAHADIBYA, PT, Biaya Pemakaian Listrik di
                                                      Summarecon Mal Serpong 2 periode 11 Jan 2023 -
1343   04-Apr-23     MANDIRI IDR      1220011559559   10 Feb 2023                                               951,199       941,781      103,596         94,178           951,199
                                                      LESTARI MAHADIBYA, PT, Biaya Kehandalan atas
                                                      Pemakaian Listrik di Summarecon Mal Serpong 2
1344   04-Apr-23     MANDIRI IDR      1220011559559   periode 11 Jan 2023 - 10 Feb 2023                         329,870       326,604       35,926         32,660           329,870
                                                      LESTARI MAHADIBYA, PT, Biaya Pemakaian Listrik di
                                                      Summarecon Digital Centre (SDC) Serpong periode
1345   04-Apr-23     MANDIRI IDR      1220011559559   11 Jan 2023 - 10 Feb 2023                                 304,643       301,626       33,179         30,162           304,643
                                                      LESTARI MAHADIBYA, PT, Biaya Kehandalan atas
                                                      Pemakaian Listrik di Summarecon Digital Centre
1346   04-Apr-23     MANDIRI IDR      1220011559559   (SDC) Serpong periode 11 Jan 2023 - 10 Feb 2023             86,942       86,081        9,469          8,608            86,942
                                                      MEKAR PRANA INDAH, PT, Biaya atas Pemakaian
1347   04-Apr-23     MANDIRI IDR      1220011559559   Listrik di Menara Bidakara 2 periode Feb 2023             268,276       265,619       29,218         26,561           268,276
                                                      MENARA DUTA, PT, Biaya atas Pemakaian Listrik
1348   04-Apr-23     MANDIRI IDR      1220011559559   Menara Duta Periode Feb 2023                              134,096       132,768       14,604         13,276           134,096
                                                      MENARA THAMRIN, PT, Biaya atas Pemakaian Listrik
                                                      di Gedung Menara Thamrin Suite 21 & 6 periode
1349   04-Apr-23     MANDIRI IDR      1220011559559   Februari 2023                                             209,513       207,438       22,818         20,743           209,513
                                                      PENGELOLA MASPION PLAZA GUNUNG SAHARI,
                                                      Biaya atas Pemakaian Listrik di Gedung Maspion
1350   04-Apr-23     MANDIRI IDR      1220011559559   Plaza Lt. 5A periode Februari 2023                        189,304       210,337           -          21,033           189,304
                                                      PERHIMPUNAN PENGHUNI KONDOMINIUM
                                                      PERKANTORAN GRAHA SURVEYOR INDONESIA, Biaya
                                                      atas Pemakaian Listrik di Gedung Surveyor Lt. 11
1351   04-Apr-23     MANDIRI IDR      1220011559559   periode 22 Jan 2023 - 22 Feb 2023                         313,982       348,868           -          34,886           313,982
                                                      PERHIMPUNAN PENGHUNI KONDOMINIUM
                                                      PERKANTORAN GRAHA SURVEYOR INDONESIA, Biaya
                                                      atas Pemakaian Listrik di Gedung Surveyor Lt. P2
1352   04-Apr-23     MANDIRI IDR      1220011559559   periode 22 Jan 2023 - 22 Feb 2023                         321,599       357,332           -          35,733           321,599
                                                      PERHIMPUNAN PENGHUNI MENARA KADIN
                                                      INDONESIA, Biaya atas Pemakaian Listrik di Gedung
1353   04-Apr-23     MANDIRI IDR      1220011559559   Menara Kadin periode Feb 2023                             350,541       389,489           -          38,948           350,541
                                                      PERHIMPUNAN PENGHUNI WISMA STACO, Biaya
                                                      atas Pemakaian Listrik di Wisma Staco periode Feb
1354   04-Apr-23     MANDIRI IDR      1220011559559   2023                                                      124,377       138,196           -          13,819           124,377
                                                      PETARUNG TANGGUH PERSADA, PT, Biaya atas
                                                      Pemakaian Listrik di Mal Bali Galeria periode Feb
1355   04-Apr-23     MANDIRI IDR      1220011559559   2023                                                      494,198       489,305       53,823         48,930           494,198

                                                      IPROAD INTERNASIONAL INDONESIA, PT, Jasa Service
1356   04-Apr-23   MANDIRI IDR     1220011559559      ONT Alcatel Lucent G-241W-A sebanyak 773 Unit          189,578,250   173,925,000   19,131,750     3,478,500       189,578,250

                                                      KERETA API INDONESIA (PERSERO) DAERAH OPERASI
                                                      1 JAKARTA, PT, Uang Muka Beban Umum atas Biaya
                                                      Pengawasan Keamanan Operasional FO Crossing KAI
1357   04-Apr-23   MANDIRI IDR     1220011559559      (KM. 23+5/6 antara Stasiun Cakung-Kranji)              175,718,900   161,210,000   17,733,100     3,224,200       175,718,900
                                                      DITJEN POSTEL, BHP Frekuensi Periode 09 Maret
                                                      2023 s.d 08 Maret 2024 - No. Aplikasi :
1358   05-Apr-23     MANDIRI IDR      1220011559559   02805688032023                                           9,836,308     9,836,308          -             -           9,836,308
                                                      DITJEN POSTEL, BHP Frekuensi Periode 09 Maret
                                                      2023 s.d 08 Maret 2024 - No. Aplikasi :
1359   05-Apr-23     MANDIRI IDR      1220011559559   02805690032023                                           9,836,308     9,836,308          -             -           9,836,308
                                                      PENGEMBANGAN PARIWISATA INDONESIA, PT,
                                                      Tagihan Kompensasi atas Pemasangan Kabel Fiber
                                                      dan Monopole Triwulan II/2023 Periode Apr-Jun
1360   05-Apr-23    SINARMAS USD       0000670707     2023                                                   552,160,268   539,040,513   74,470,896    61,351,141       552,160,268
                                                      PENGEMBANGAN PARIWISATA INDONESIA, PT,
                                                      Tagihan Kompensasi atas Pemasangan Kabel Fiber
                                                      dan Monopole Triwulan II/2023 Periode Apr-Jun
1361   05-Apr-23     MANDIRI IDR      1220011559559   2023 - PPN1                                              8,263,590     8,263,590          -             -           8,263,590
                                                      PENGEMBANGAN PARIWISATA INDONESIA, PT,
                                                      Tagihan Kompensasi atas Pemasangan Kabel Fiber
                                                      dan Monopole Triwulan II/2023 Periode Apr-Jun
1362   05-Apr-23     MANDIRI IDR      1220011559559   2023 - PPN                                              59,814,100    59,814,100          -             -          59,814,100
                                                      CHINA MOBILE INTERNATIONAL LTD, IP Transit
1363   05-Apr-23    SINARMAS USD       0000670707     Equinix SG 50Mbps Periode Mar 2023                       9,820,424     9,820,424          -             -           9,820,424
                                                      CHINA MOBILE INTERNATIONAL LTD, IP Transit
1364   05-Apr-23    SINARMAS USD       0000670707     Equinix SG 20Mbps Periode Mar 2023                       7,079,140     7,079,140          -             -           7,079,140
                                                      JAKARTA INTILAND, PT, Biaya atas Pemakaian Listrik
1365   05-Apr-23     MANDIRI IDR      1220011559559   di Ramayana Jatinegara PeriodeMaret 2023                  311,389       308,306       33,913         30,830           311,389
Page 82
      TANGGAL
    PENGELUARAN                      NOMOR REKENING
       DI BANK  REKENING BANK          BANK YANG                                                                  NILAI MUTASI                       NILAI YANG DIBAYARKAN
NO.  STATEMENT YANG DIGUNAKAN          DIGUNAKAN                 NAMA VENDOR DAN KETERANGAN                          BANK              DPP           PPN             PPh           NET DIBAYARKAN
                                                       JAKARTA INTILAND, PT, Biaya atas Pemakaian Listrik
1366   05-Apr-23     MANDIRI IDR       1220011559559   di Ramayana Karawang Periode Maret 2023                         534,332           529,043       58,193         52,904               534,332
                                                       JELAJAH DATA SEMESTA, PT, Dedicated Internet
1367   05-Apr-23     MANDIRI IDR       1220011559559   Bandwidth periode Mar 2023                                   539,550,000      495,000,000    54,450,000     9,900,000           539,550,000
                                                       PLN PERSERO, PT, Biaya Pembelian Token Listrik Kwh
1368   05-Apr-23     MANDIRI IDR       1220011559559   PLN Site 704725 Cipinang Campedak-016                             51,750           51,750           -             -                  51,750
                                                       PLN PERSERO, PT, Biaya Pembelian Token Kwh Listrik
1369   05-Apr-23     MANDIRI IDR       1220011559559   PLN Site 702751-Pegadungan-027                                  102,500           102,500           -             -                 102,500
                                                       RAJAWALI ADIWISMA, PT, Biaya atas Pemakaian
1370   05-Apr-23     MANDIRI IDR       1220011559559   Listrik di Menara Rajawali Periode Feb 2023                     182,419           180,613       19,867         18,061               182,419
                                                       SERPONG CIPTA KREASI, PT, Biaya atas Pemakaian
                                                       Listrik di Gedung Serpong M-Town Residence Periode
1371   05-Apr-23     MANDIRI IDR       1220011559559   Februari 2023                                                   945,008           935,651      102,922         93,565               945,008
                                                       SENAYAN TRIKARYA SEMPANA, PT, Biaya Pemakaian
                                                       Listrik di Sentral Senayan I Periode 28 Jan 2023 - 28
1372   05-Apr-23   MANDIRI IDR      1220011559559      Feb 2023                                                          82,729           81,910        9,010          8,191                82,729
                                                       SENAYAN TRIKARYA SEMPANA, PT, Biaya Pemakaian
                                                       Listrik di Plaza Senayan Arcadia periode 28 Jan 2023 -
1373   05-Apr-23   MANDIRI IDR      1220011559559      28 Feb 2023                                                       88,062           87,190        9,591          8,719                88,062
                                                       SENAYAN TRIKARYA SEMPANA, PT, Biaya Pemakaian
                                                       Listrik di Plaza Senayan periode 28 Jan 2023 - 28 Feb
1374   05-Apr-23   MANDIRI IDR      1220011559559      2023                                                            481,962           477,190       52,491         47,719               481,962
                                                       FPU PENJAGA SITE, Biaya penjaga site dan uang
                                                       canang bulan Maret 2023 di 3 site BTS (Nontrf Bank
1375   06-Apr-23     SINARMAS IDR       0002999994     Sinarmas)                                                      2,400,000        2,400,000           -             -               2,400,000
                                                       PARAMITRA MEDIA INTERAKTIF, PT, Bali Fiber IPTV
1376   06-Apr-23       BCA IDR          3193058058     Revenues Sharing periode Oktober 2020                         50,000,000       51,020,408           -       1,020,408            50,000,000
                                                       PPPRS KEBAGUSAN CITY, Tagihan Revenue Sharing
                                                       periode Oktober - Desember 2022 di Apartement
1377   06-Apr-23     MANDIRI IDR       1220011559559   Kebagusan City                                                 1,507,653        1,675,170           -         167,517             1,507,653
                                                       BIBIT, Mr, Biaya Pekerjaan untuk FO Cut Feeder
                                                       Cluster Taman Werdi yang terbakar akibat arus
                                                       pendek dan FO Cut Distribusi Cluster Taman Mumbul
                                                       (PO Rp.4.719.410,- Potongan PPh 21(3%) Rp.141.582,-
1378   06-Apr-23     SINARMAS IDR       0002999994     )                                                              4,577,828        4,719,410           -         141,582             4,577,828
                                                       BIBIT, Mr, Biaya pekerjaan perbaikan tiang miring di
                                                       Cluster Taman Mumbul (PO Rp.3.280.905,- Potongan
1379   06-Apr-23     SINARMAS IDR       0002999994     PPh 21(3%) Rp.98.427,- )                                       3,182,478        3,280,905           -          98,427             3,182,478
                                                       FPU PENJAGA SITE, Biaya penjaga site dan uang
                                                       canang bulan Maret 2023 di 65 site BTS (Trf Bank
1380   10-Apr-23     SINARMAS IDR       0000240408     Sinarmas)                                                     38,200,000       38,200,000           -             -              38,200,000
                                                       PGAS TELEKOMUNIKASI NUSANTARA, PT, Tagihan
                                                       Sewa IPLC Jakarta - Equinix Singapore periode Mar
1381   10-Apr-23     MANDIRI IDR       1220011559559   2023                                                         359,710,000      330,010,000    36,300,000     6,600,000           359,710,000
                                                       SMARTFREN TELECOM TBK, PT, Restitusi Periode Juni
1382   10-Apr-23     MANDIRI IDR       1220011559559   dan Sept 2022                                          -       2,837,969 -      2,837,969           -             -     -         2,837,969
                                                       SMARTFREN TELECOM TBK, PT, Internet Bandwith
1383   10-Apr-23     MANDIRI IDR       1220011559559   17site @50 Mbps (I: 8000001085)                              500,310,000      459,000,000    50,490,000     9,180,000           500,310,000
                                                       SMARTFREN TELECOM TBK, PT, Internet Bandwith
1384   10-Apr-23     MANDIRI IDR       1220011559559   22site @50 Mbps (I: 8000001078)                              647,460,000      594,000,000    65,340,000    11,880,000           647,460,000
                                                       SMARTFREN TELECOM TBK, PT, Internet Bandwith 1
1385   10-Apr-23     SINARMAS IDR       0000240408     site @50 Mbps (I: 1000055196)                                 29,430,000       27,000,000     2,970,000       540,000            29,430,000
                                                       SMARTFREN TELECOM TBK, PT, Internet Bandwith 4
1386   10-Apr-23     SINARMAS IDR       0000240408     site @50 Mbps (I: 8000001079)                                117,720,000      108,000,000    11,880,000     2,160,000           117,720,000
                                                       BALI PECATU GRAHA, PT, Pembayaran tagihan listrik
                                                       IPL dan BPG Bulan April 2023 (pemakaian bulan
1387   11-Apr-23     SINARMAS IDR       0002999994     Maret 2023)                                                   12,159,886       12,159,886           -             -              12,159,886
                                                       INFRA YES SOLUSINDO, PT, Biaya Management Fee
                                                       atas Revenue Sharing periode Februari 2023 di
1388   11-Apr-23     MANDIRI IDR       1220011559559   Apartement Green Pramuka                                      34,823,596       35,534,281           -         710,685            34,823,596
                                                       INFRA YES SOLUSINDO, PT, Biaya Management Fee
                                                       atas Revenue Sharing periode Januari 2023 di
1389   11-Apr-23     MANDIRI IDR       1220011559559   Apartement Green Pramuka                                      31,959,195       32,611,423           -         652,228            31,959,195

                                                       PERMATA INDO SEJAHTERA, PT, Reimbursement
1390   11-Apr-23     MANDIRI IDR       1220011559559   Insentif Outsource Div. Direct Sales Periode Jan 2023         29,620,155       29,423,995      239,751         43,591            29,620,155

                                                       PERMATA INDO SEJAHTERA, PT, Reimbursement
1391   11-Apr-23     MANDIRI IDR       1220011559559   Salary Outsource Div. Direct Sales Periode Feb 2023           88,672,032       88,084,800      717,728        130,496            88,672,032
                                                       PLN PERSERO, PT, Biaya Tagihan Listrik PLN
1392   13-Apr-23     MANDIRI IDR       1220011559559   Pascabayar BTS Region Bali Periode April 2023              1,258,746,692     1,258,746,692          -             -            1,258,746,692
                                                       PLN PERSERO, PT, Pengajuan Token Pulsa Listrik
1393   13-Apr-23     MANDIRI IDR       1220011559559   Phase 04 Region Jawa Tengah Periode April 2023               126,259,000      126,259,000           -             -             126,259,000
                                                       PLN PERSERO, PT, Pengajuan Token Pulsa Listrik
1394   13-Apr-23     MANDIRI IDR       1220011559559   Phase 04 Region Jawa Barat Periode April 2023                 48,833,000       48,833,000           -             -              48,833,000
                                                       PLN PERSERO, PT, Biaya Tagihan KWH PLN
1395   13-Apr-23     MANDIRI IDR       1220011559559   Pascabayar Region Jawa Tengah Periode April 2023             151,209,461      151,209,461           -             -             151,209,461
                                                       PLN PERSERO, PT, Biaya PLN Auto Debet Region Jawa
1396   13-Apr-23     MANDIRI IDR       1220011559559   Barat Periode April 2023                                      60,845,556       60,845,556           -             -              60,845,556
                                                       PLN PERSERO, PT, Biaya PLN Autodebet Jawa Timur
1397   13-Apr-23     MANDIRI IDR       1220011559559   Periode April 2023                                           179,548,134      179,548,134           -             -             179,548,134
                                                       PLN PERSERO, PT, Biaya Tagihan KWH PLN Pasca
1398   13-Apr-23     MANDIRI IDR       1220011559559   Bayar Region Jabodetabek Periode April 2023                2,340,591,223     2,340,591,223          -             -            2,340,591,223
                                                       PPPSRS CBD PLUIT, Biaya atas Pemakaian Listrik CBD
1399   13-Apr-23     MANDIRI IDR       1220011559559   Pluit periode Mar 2023                                          316,296           316,296           -             -                 316,296
                                                       SUGIH BERKAT, PT, Biaya atas Pemakaian Listrik di
                                                       Gedung Menara Citicon periode 26 Februari 2023 -
1400   13-Apr-23     MANDIRI IDR       1220011559559   27 Maret 2023                                                   707,000           700,000       77,000         70,000               707,000

                                                       MULIA INTIPELANGI, PT, Biaya atas Pemakaian Listrik
1401   13-Apr-23   MANDIRI IDR      1220011559559      Mall Taman Anggrek (GL-L5) Periode Mar 2023                    3,625,529        3,589,632      394,860        358,963             3,625,529
                                                       AMAZANA KENCANA, PT, Biaya atas Pemakaian
1402   14-Apr-23     MANDIRI IDR       1220011559559   Listrik Apartemen Amazana Periode Mar 2023                      385,171           353,368       38,870          7,067               385,171
                                                       ASSET PACIFIC, PT, Biaya atas Pemakaian Listrik di
1403   14-Apr-23     MANDIRI IDR       1220011559559   Gedung Menara Salemba periode Feb 2023                          121,338           120,136       13,215         12,013               121,338
Page 83
      TANGGAL
    PENGELUARAN                  NOMOR REKENING
       DI BANK  REKENING BANK      BANK YANG                                                               NILAI MUTASI                 NILAI YANG DIBAYARKAN
NO.  STATEMENT YANG DIGUNAKAN      DIGUNAKAN              NAMA VENDOR DAN KETERANGAN                          BANK         DPP          PPN             PPh       NET DIBAYARKAN
                                                  BANGUNMUSTIKA INTIPERSADA, PT, Biaya atas
                                                  Pemakaian Listrik dan Air di ITC CIpulir Mas Lt.
                                                  4/B.071 (Call Center) Periode 18 Feb 2022 - 17 Mar
1404   14-Apr-23   MANDIRI IDR    1220011559559   2023                                                        10,035,163   11,150,181         -       1,115,018        10,035,163
                                                  BANGUNMUSTIKA INTIPERSADA, PT, Biaya atas
                                                  Pemakaian Listrik di ITC Cipulir Mas Lt 4/F.035 (IKR)
1405   14-Apr-23   MANDIRI IDR    1220011559559   Periode 18 Feb 2022 - 17 Mar 2023                            1,847,305    2,052,561         -         205,256         1,847,305
                                                  BANGUNMUSTIKA INTIPERSADA, PT, Biaya atas
                                                  Pemakaian Listrik di ITC Cipulir Mas Lt. Dasar - LT. 4
1406   14-Apr-23   MANDIRI IDR    1220011559559   periode 18 Feb 2022 - 17 Mar 2023                            1,215,990    1,351,099         -         135,109         1,215,990
                                                  BENTENG ANUGERAH ASIH, PT, Biaya Pengiriman
                                                  Material FO Backbone P2 Kota Bandung dari PT
1407   14-Apr-23   MANDIRI IDR    1220011559559   Prysmian Cable ke PT Sembilan Belas Multi Usaha              2,873,900    2,900,000     31,900         58,000         2,873,900
                                                  BENTENG ANUGERAH ASIH, PT, Biaya Pengiriman
                                                  Material Kabel dari PT tadya Mandiri Sinergi ke WH
1408   14-Apr-23   MANDIRI IDR    1220011559559   Serpong                                                      3,765,800    3,800,000     41,800         76,000         3,765,800
                                                  BENTENG ANUGERAH ASIH, PT, Biaya Pengiriman
                                                  Material Kabel, Tiang Dll dari PT Puteratel Andalan
1409   14-Apr-23   MANDIRI IDR    1220011559559   Sukses ke WH Serpong                                         5,450,500    5,500,000     60,500        110,000         5,450,500

                                                  BINAMITRA MEGAWARNA, PT, Pembelian Flyer
                                                  Promo Ramadhan Berkah Periode Februari 2023
                                                  Area Jadetabek 30.000 Lbr, Flyer Promo Ramadhan
1410   14-Apr-23   MANDIRI IDR    1220011559559   Berkah Periode Februari 2023 Area SBY 4.000 Lbr             11,325,100   10,390,000   1,142,900       207,800        11,325,100
                                                  CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                  Material ONT dari WH Serpong ke WH Cipulir dan
1411   14-Apr-23   MANDIRI IDR    1220011559559   WH Matraman                                                   743,250      750,000       8,250         15,000           743,250
                                                  CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                  Material Cable Optical ADSS 96 Core dari PT
1412   14-Apr-23   MANDIRI IDR    1220011559559   Prysmian Cable ke WH Serpong                                  594,600      600,000       6,600         12,000           594,600
                                                  CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                  Material Kabel dari PT Furukawa ke PT Sembilan
1413   14-Apr-23   MANDIRI IDR    1220011559559   belas Multi Usaha                                             495,500      500,000       5,500         10,000           495,500

                                                  CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
1414   14-Apr-23   MANDIRI IDR    1220011559559   Material Cable dari WH Serpong ke Office Matraman             495,500      500,000       5,500         10,000           495,500
                                                  CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                  Material Rectifier, JC, Battery, ODB dari WH Serpong
1415   14-Apr-23   MANDIRI IDR    1220011559559   ke Office Matraman                                            495,500      500,000       5,500         10,000           495,500

                                                  CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
1416   14-Apr-23   MANDIRI IDR    1220011559559   Material ONT dari WH Serpong ke Office Matraman               495,500      500,000       5,500         10,000           495,500
                                                  CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                  Material Non SJUT Jl. Gusti Ngurahrai dari WH
1417   14-Apr-23   MANDIRI IDR    1220011559559   Serpong ke PT Fiber Buana Indonesia                           495,500      500,000       5,500         10,000           495,500
                                                  DIAN MUSTIKA AGUNG, PT, Pembelian Aquaproff 1
                                                  Kg Pengadaan Material Stock Buffer Q1 Regional
1418   14-Apr-23   MANDIRI IDR    1220011559559   Jabo Sebanyak 40 Unit                                        2,664,000    2,400,000    264,000            -           2,664,000
                                                  DUNIA MAKMUR PROPERTI, PT, Biaya atas
                                                  Pemakaian Listrik di Plaza Summarecon Bekasi
1419   14-Apr-23   MANDIRI IDR    1220011559559   Periode Mar 2023                                              683,155      676,391      74,403         67,639           683,155
                                                  FABCO GLOBAL INDONESIA, PT, Pembelian Sticker
                                                  Sandblast 120 cm x 140cm , 120x102 cm Sebanyak 1
1420   14-Apr-23   MANDIRI IDR    1220011559559   LUMP SUM                                                      294,000      300,000          -           6,000           294,000
                                                  GAPURA INTIUTAMA, PT, Tagihan Revenue Sharing
                                                  periode Juni - Agustus 2022 di Apartement Mount
1421   14-Apr-23   MANDIRI IDR    1220011559559   Blanc                                                        6,132,344    5,626,004    618,860        112,520         6,132,344
                                                  GERAI LISTRIK PASAR MOBIL KEMAYORAN, Biaya
                                                  Tagihan Pascabayar untuk Site 70035 Gunung Sahari
                                                  Utara-008,700414 Gunung Sahari Utara-009 dan
                                                  701015 Danau Sunter DII-003 Periode April 2023
1422   14-Apr-23   MANDIRI IDR    1220011559559   (Pemakaian Maret 2023)                                       5,439,418    5,550,426         -         111,008         5,439,418
                                                  GRAHA IRAMA, PT, Biaya atas Pemakaian Listrik di
                                                  Gedung Graha Irama periode 01 Mar 2022 - 01 Apr
1423   14-Apr-23   MANDIRI IDR    1220011559559   2023                                                          130,185      144,649          -          14,464           130,185
                                                  GRIYA MURIA KENCANA, PT, Tagihan Revenue
                                                  Sharing periode Januari 2023 atas Penempatan
1424   14-Apr-23   MANDIRI IDR    1220011559559   Perangkat Telekomunikasi di Gedung Prince Center              737,300      730,000      80,300         73,000           737,300
                                                  GRIYA MURIA KENCANA, PT, Biaya atas Pemakaian
                                                  Listrik di Gedung Prince Center periode 25 Feb 2023 -
1425   14-Apr-23   MANDIRI IDR    1220011559559   24 Mar 2023                                                   214,032      211,913      23,310         21,191           214,032
                                                  HIJAU TEDUH SAKA PERSADA, PT, Biaya atas
                                                  Pemakaian Listrik di Gedung Sastra Graha Periode 11
1426   14-Apr-23   MANDIRI IDR    1220011559559   Feb 2023 - 10 Mar 2023                                        126,483      140,536          -          14,053           126,483
                                                  ISMAWA TRIMITRA, PT, Biaya atas Pemakaian Listrik
                                                  di Graha Iskandarsyah periode 20 Feb 2023 - 20 Mar
1427   14-Apr-23   MANDIRI IDR    1220011559559   2023                                                          148,223      146,755      16,143         14,675           148,223
                                                  KRAKATAU SARANA PROPERTI, PT, Biaya atas
                                                  Pemakaian Listrik di Krakatau Steel Group periode
1428   14-Apr-23   MANDIRI IDR    1220011559559   Feb 2023                                                        37,864      37,488       4,124          3,748            37,864
                                                  LESTARI MAHADIBYA, PT, Biaya Kehandalan atas
                                                  Pemakaian Listrik di Summarecon Digital Centre
1429   14-Apr-23   MANDIRI IDR    1220011559559   (SDC) Serpong periode 11 Feb 2023 - 10 Mar 2023                 80,028      79,235       8,716          7,923            80,028
                                                  LESTARI MAHADIBYA, PT, Biaya Pemakaian Listrik di
                                                  Summarecon Digital Centre (SDC) Serpong periode
1430   14-Apr-23   MANDIRI IDR    1220011559559   11 Feb 2023 - 10 Mar 2023                                     277,285      274,539      30,199         27,453           277,285
                                                  LESTARI MAHADIBYA, PT, Biaya Kehandalan atas
                                                  Pemakaian Listrik di Summarecon Mal Serpong 2
1431   14-Apr-23   MANDIRI IDR    1220011559559   periode 11 Feb 2023 - 10 Mar 2023                             311,389      308,305      33,914         30,830           311,389
                                                  LESTARI MAHADIBYA, PT, Biaya Kehandalan atas
                                                  Pemakaian Listrik di Summarecon Mal Serpong 1
1432   14-Apr-23   MANDIRI IDR    1220011559559   periode 11 Feb 2023 - 10 Mar 2023                             277,454      274,706      30,218         27,470           277,454
                                                  LESTARI MAHADIBYA, PT, Biaya Pemakaian Listrik di
                                                  Summarecon Mal Serpong 1 periode 11 Feb 2023 -
1433   14-Apr-23   MANDIRI IDR    1220011559559   10 Mar 2023                                                   691,026      684,184      75,260         68,418           691,026
Page 84
      TANGGAL
    PENGELUARAN                  NOMOR REKENING
       DI BANK  REKENING BANK      BANK YANG                                                           NILAI MUTASI                 NILAI YANG DIBAYARKAN
NO.  STATEMENT YANG DIGUNAKAN      DIGUNAKAN              NAMA VENDOR DAN KETERANGAN                      BANK         DPP          PPN             PPh       NET DIBAYARKAN
                                                  LESTARI MAHADIBYA, PT, Biaya Pemakaian Listrik di
                                                  Summarecon Mal Serpong 2 periode 11 Feb 2023 -
1434   14-Apr-23   MANDIRI IDR    1220011559559   10 Mar 2023                                               883,376      874,630      96,209         87,463           883,376
                                                  MAKMUR ORIENT JAYA, PT, Biaya Pemakaian Listrik
                                                  di Gedung Sentra Summarecon Bekasi Parkir DTW
1435   14-Apr-23   MANDIRI IDR    1220011559559   periode 13 Feb 2023 - 12 Mar 2023                         137,616      136,253      14,988         13,625           137,616
                                                  MAKMUR ORIENT JAYA, PT, Biaya Kehandalan Atas
                                                  Pemakaian Listrik di Gedung Sentra Summarecon
                                                  Bekasi Ruang Panel BZ2 periode 13 Feb 2023 - 12
1436   14-Apr-23   MANDIRI IDR    1220011559559   Mar 2023                                                  153,843      152,320      16,755         15,232           153,843
                                                  MAKMUR ORIENT JAYA, PT, Biaya Kehandalan Atas
                                                  Pemakaian Listrik di Gedung Sentra Summarecon
                                                  Bekasi Ruang Panel 1 Zona 1 periode 13 Feb 2023 -
1437   14-Apr-23   MANDIRI IDR    1220011559559   12 Mar 2023                                               129,673      128,388      14,123         12,838           129,673
                                                  MAKMUR ORIENT JAYA, PT, Biaya Kehandalan Atas
                                                  Pemakaian Listrik di Gedung Sentra Summarecon
                                                  Bekasi Parkir DTW periode 13 Feb 2023 - 12 Mar
1438   14-Apr-23   MANDIRI IDR    1220011559559   2023                                                      102,128      101,116      11,123         10,111           102,128

                                                  MAKMUR ORIENT JAYA, PT, Biaya Pemakaian Listrik
                                                  di Gedung Sentra Summarecon Bekasi Ruang Panel 1
1439   14-Apr-23   MANDIRI IDR    1220011559559   Zona 1 periode 13 Feb 2023 - 12 Mar 2023                  293,239      290,335      31,937         29,033           293,239
                                                  MAKMUR ORIENT JAYA, PT, Biaya Kehandalan Atas
                                                  Pemakaian Listrik di Gedung Sentra Summarecon
                                                  Bekasi Ruang Panel BZ3 periode 13 Feb 2023 - 12
1440   14-Apr-23   MANDIRI IDR    1220011559559   Mar 2023                                                  166,004      164,360      18,080         16,436           166,004
                                                  MAKMUR ORIENT JAYA, PT, Biaya Pemakaian Listrik
                                                  di Gedung Sentra Summarecon Bekasi Ruang Panel
1441   14-Apr-23   MANDIRI IDR    1220011559559   BZ3 periode 13 Feb 2023 - 12 Mar 2023                     498,503      493,567      54,292         49,356           498,503
                                                  MAKMUR ORIENT JAYA, PT, Biaya Pemakaian Listrik
                                                  di Gedung Sentra Summarecon Bekasi Ruang Panel
1442   14-Apr-23   MANDIRI IDR    1220011559559   BZ2 periode 13 Feb 2023 - 12 Mar 2023                     429,800      425,544      46,810         42,554           429,800
                                                  MEGA PLAZA, PT, Biaya atas Pemakaian Listrik di
1443   14-Apr-23   MANDIRI IDR    1220011559559   Gedung Mega Plaza periode Feb 2023                        139,185      137,807      15,158         13,780           139,185
                                                  MEGA PLAZA, PT, Biaya atas Pemakaian Listrik di
1444   14-Apr-23   MANDIRI IDR    1220011559559   Gedung Mega Plaza periode Jan 2023                        164,928      163,295      17,962         16,329           164,928
                                                  NUSA KIRANA REAL ESTATE, PT, Biaya Sewa
                                                  Penempatan Perangkat Telekomunikasi di Gedung
                                                  Kirana Boutique Berdasarkan Penggunaan Jaringan
1445   14-Apr-23   MANDIRI IDR    1220011559559   Internet periode Januari 2022 - Maret 2022              12,426,421   12,303,387   1,353,372     1,230,338        12,426,421

                                                  PERHIMPUNAN PENGHUNI GEDUNG PERKANTORAN
                                                  KIRANA TWO, Biaya atas Pemakaian Listrik di Gedung
1446   14-Apr-23   MANDIRI IDR    1220011559559   Kirana Two periode 21 Feb 2022 - 20 Mar 2023              605,457      672,730          -          67,273           605,457
                                                  PERHIMPUNAN PENGHUNI KONDOMINIUM
                                                  PERKANTORAN GRAHA SURVEYOR INDONESIA, Biaya
                                                  atas Pemakaian Listrik di Gedung Surveyor Lt. 11
1447   14-Apr-23   MANDIRI IDR    1220011559559   periode 22 Feb 2023 - 22 Mar 2023                         326,423      362,692          -          36,269           326,423
                                                  PERHIMPUNAN PENGHUNI KONDOMINIUM
                                                  PERKANTORAN GRAHA SURVEYOR INDONESIA, Biaya
                                                  atas Pemakaian Listrik di Gedung Surveyor Lt. P2
1448   14-Apr-23   MANDIRI IDR    1220011559559   periode 22 Feb 2023 - 22 Mar 2023                         315,251      350,278          -          35,027           315,251
                                                  PLN PERSERO, PT, Biaya PLN Autodebet Jawa Timur
1449   14-Apr-23   MANDIRI IDR    1220011559559   Periode April 2023                                       6,615,409    6,615,409         -             -           6,615,409
                                                  SUKA DUKA GIRI HILL, Biaya Management Fee atas
                                                  Revenue Sharing periode Januari 2023 di Suka Duka
1450   14-Apr-23   MANDIRI IDR    1220011559559   Raya Kampial - Perumahan Giri Hill                       2,297,062    2,392,772         -          95,710         2,297,062

                                                  TELEKOMUNIKASI SELULAR, PT, Biaya Paket Data
                                                  Pascabayar Telkomsel Mikrotik untuk Monitoring
1451   14-Apr-23   MANDIRI IDR    1220011559559   Alarm Area Jawa Tengah 7 MSISDN Periode Apr 2023          555,000      500,000      55,000            -             555,000
                                                  TELEKOMUNIKASI SELULAR, PT, Biaya Paket Data
                                                  Pascabayar Telkomsel Mikrotik untuk Monitoring
                                                  Alarm Area Jawa Tengah sebanyak 10 MSISDN
1452   14-Apr-23   MANDIRI IDR    1220011559559   Periode Apr 2023                                         1,054,500     950,000     104,500            -           1,054,500
                                                  TELKOM INDONESIA, PT, Biaya Paket Broadband
                                                  Indihome for Monitoring (CSR) CCTV, FO Not Ready
1453   14-Apr-23   MANDIRI IDR    1220011559559   Area Yogyakarta Periode Apr 2023                         1,265,400    1,140,000    125,400            -           1,265,400
                                                  TIRTA INDORAYA LOGISTICS, PT, Biaya Pengiriman
                                                  Material Kabel dari PT Furukawa ke PT Simetrik
1454   14-Apr-23   MANDIRI IDR    1220011559559   Integrasi                                                1,035,500     950,000     104,500         19,000         1,035,500
                                                  TIRTA INDORAYA LOGISTICS, PT, Biaya Pengiriman
                                                  Material Kabel dari PT Furukawa ke PT Santa Multi
1455   14-Apr-23   MANDIRI IDR    1220011559559   Semesta                                                  1,035,500     950,000     104,500         19,000         1,035,500
                                                  TIRTA INDORAYA LOGISTICS, PT, Biaya Pengiriman
                                                  Material Subduct HDPE 40/34 dari PT Alpha Cikupa
1456   14-Apr-23   MANDIRI IDR    1220011559559   Makmur ke WH Serpong                                     1,035,500     950,000     104,500         19,000         1,035,500
                                                  TIRTA INDORAYA LOGISTICS, PT, Biaya Pengiriman
                                                  Material Kabel dari WH Serpong ke PT Bayu
1457   14-Apr-23   MANDIRI IDR    1220011559559   Manunggal Sejahtera                                      4,087,500    3,750,000    412,500         75,000         4,087,500

                                                  WISMA KEIAI INDONESIA, PT, Tagihan Profit Sharing
                                                  Penempatan Perangkat Telekomunikasi di Gedung
1458   14-Apr-23   MANDIRI IDR    1220011559559   Wisma Keiai periode Oktober 2022 - Desember 2022        38,511,300   38,130,000   4,194,300     3,813,000        38,511,300
                                                  BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
                                                  Penarikan kabel FO Cut Impact Tertabrak Truck site
                                                  Diskominfo AP RW01, Meruya Selatan, Kembangan,
1459   14-Apr-23   MANDIRI IDR    1220011559559   Jakbar                                                   2,648,966    2,863,747         -         214,781         2,648,966
                                                  BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
                                                  Penarikan kabel FO Cut Impact Tertabrak Truck site
                                                  Diskominfo AP RW02, Kedaung Kaliangke,
1460   14-Apr-23   MANDIRI IDR    1220011559559   Cengkareng, JakBar                                       1,453,866    1,571,747         -         117,881         1,453,866
Page 85
      TANGGAL
    PENGELUARAN                      NOMOR REKENING
       DI BANK  REKENING BANK          BANK YANG                                                               NILAI MUTASI                   NILAI YANG DIBAYARKAN
NO.  STATEMENT YANG DIGUNAKAN          DIGUNAKAN               NAMA VENDOR DAN KETERANGAN                         BANK          DPP           PPN             PPh       NET DIBAYARKAN

                                                       BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
                                                       Penarikan kabel FO Cut Impact Tertabrak Truck site
1461   14-Apr-23     MANDIRI IDR       1220011559559   Diskominfo AP RW07, kalibaru, Cilingcing, Jakut             1,800,186     1,946,147          -         145,961         1,800,186
                                                       BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
                                                       Penarikan kabel FO Cut Impact Tertabrak Truck site
                                                       Diskominfo AP RW02, Rawa Buaya, Cengkareng,
1462   14-Apr-23     MANDIRI IDR       1220011559559   JakBar                                                      1,025,406     1,108,547          -          83,141         1,025,406
                                                       SANTA MULTI SEMESTA, PT, Tagihan 90% atas
                                                       Pekerjaan Penarikan Kabel Udara Final Jakarta Utara
1463   14-Apr-23     MANDIRI IDR       1220011559559   di Espay Debit Indonesia Koe                               12,611,448    11,786,400    1,296,504       471,456        12,611,448
                                                       SANTA MULTI SEMESTA, PT, Tagihan 90% atas
                                                       Pekerjaan Penarikan Kabel Tanam Final Jakarta Utara
1464   14-Apr-23     MANDIRI IDR       1220011559559   di Info Helmet Gallery                                     17,954,172    16,779,600    1,845,756       671,184        17,954,172
                                                       SANTA MULTI SEMESTA, PT, Tagihan 90% atas
                                                       Pekerjaan Penarikan Kabel Udara Final Jakarta
1465   14-Apr-23     MANDIRI IDR       1220011559559   Selatan di YAY.Bharata Monde (Saka Academy)                 4,968,117     4,643,100     510,741        185,724         4,968,117
                                                       BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
                                                       Penarikan Kabel FO Cut Impact Pohon Tumbang site
1466   14-Apr-23   MANDIRI IDR      1220011559559      MP Cilangkap-001                                            1,685,486     1,822,147          -         136,661         1,685,486
                                                       BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
                                                       Penarikan Kabel FO Cut Impact Kabel Tertabrak Truck
1467   14-Apr-23   MANDIRI IDR      1220011559559      site MP Gunung-001                                          1,753,566     1,895,747          -         142,181         1,753,566
                                                       BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
                                                       Penarikan kabel FO Cut Impact Kabel PLN Konslet
1468   14-Apr-23   MANDIRI IDR      1220011559559      site MP Cipinang Besar Selatan-002                          1,448,686     1,566,147          -         117,461         1,448,686
                                                       BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
                                                       Penarikan Kabel FO Cut Impact Kabel Crossing
1469   14-Apr-23   MANDIRI IDR      1220011559559      Tertabrak Truck site Bintaro-010                            1,415,386     1,530,147          -         114,761         1,415,386
                                                       BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
                                                       Penarikan Kabel FO Cut Impact Kabel Crossing Jatuh
1470   14-Apr-23   MANDIRI IDR      1220011559559      site MP Pulo Gebang-001                                     1,587,066     1,715,747          -         128,681         1,587,066
                                                       BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
                                                       Penarikan Kabel FO Cut Impact Kabel Tertabrak Truck
1471   14-Apr-23   MANDIRI IDR      1220011559559      site Bintaro-010                                            1,805,366     1,951,747          -         146,381         1,805,366
                                                       BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
                                                       Penarikan Kabel FO Cut Impact Kabel Tertabrak Truck
1472   14-Apr-23   MANDIRI IDR      1220011559559      site MP Cilandak Timur-002                                  2,056,966     2,223,747          -         166,781         2,056,966
                                                       JELAJAH DATA SEMESTA, PT, Dedicated Internet
1473   17-Apr-23     MANDIRI IDR       1220011559559   Bandwidth periode Apr 2023                                539,550,000   495,000,000   54,450,000     9,900,000       539,550,000
                                                       NOKIA SOLUTIONS and NETWORK INDONESIA, PT,
                                                       Jasa Maintenance OLT FX-4 Period Q2 24 Jan 2023 -
1474   17-Apr-23     MANDIRI IDR       1220011559559   23 Apr 2023                                               308,079,543   282,641,782   31,090,596     5,652,835       308,079,543
                                                       PLN PERSERO, PT, Pengajuan Token Pulsa Listrik
1475   17-Apr-23     MANDIRI IDR       1220011559559   Phase 04 Region Jabotabek Periode April 2023              447,001,500   447,001,500          -             -         447,001,500
                                                       PLN PERSERO, PT, Biaya Pembelian Token Kwh Listrik
1476   17-Apr-23     MANDIRI IDR       1220011559559   PLN Site Timuran-003                                         503,500       503,500           -             -             503,500
                                                       TELEKOMUNIKASI SELULAR, PT, Biaya Top Up Paket
                                                       Data Mikrotik site Nageri Kaler-008, Sriwijaya-MP, &
                                                       MP Daeng Mohamad Ardiwinata West Java Periode
1477   17-Apr-23     MANDIRI IDR       1220011559559   Maret 2023                                                   281,500       281,500           -             -             281,500

                                                       BIBIT, Mr, Biaya Pekerjaan Perbaikan Tiang Miring di
                                                       Cluster Mutiara Kampial dan Pekerjaan Perbaikan
                                                       Kabel Kendor karena aksesoris yang lepas di Cluster
                                                       Banjar Taman Griya dan Nuansa Bukit (PO
1478   18-Apr-23     SINARMAS IDR       0002999994     Rp.2.549.010,- Potongan PPh 21(3%) Rp.76.470,-              2,472,540     2,549,010          -          76,470         2,472,540
                                                       IMAM TAUFIK, Biaya Penggantian Pole P7_164 Rusak
                                                       Link Site_31 to BLL_08 Sec_1 Jln. Raya Perean
                                                       Baturiti - Tabanan (PO Rp.1.157.747,- Potongan PPh
1479   18-Apr-23     SINARMAS IDR       0002999994     21(3%) Rp.34.732,- )                                        1,123,015     1,157,747          -          34,732         1,123,015
                                                       BINAMITRA MEGAWARNA, PT, Pembelian Form
                                                       Work Order Kertas NCR Pengadaan Material
                                                       Aksesoris IKR Q1 2023 3.500 Set, Form Dismantle
                                                       NCR Pengadaan Materia Aksesoris IKR Q1 2023 6.000
1480   26-Apr-23     MANDIRI IDR       1220011559559   Set                                                         8,450,225     7,752,500     852,775        155,050         8,450,225
                                                       CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                       Material Cable ADSS 96 Core dari WH Serpong ke
1481   26-Apr-23     MANDIRI IDR       1220011559559   Office Matraman                                              495,500       500,000        5,500         10,000           495,500
                                                       CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                       Material Panel Box KWH dari PT Nobi Putra Angkasa
1482   26-Apr-23     MANDIRI IDR       1220011559559   ke Office Matraman                                           495,500       500,000        5,500         10,000           495,500
                                                       GARAMA PROPERTY, PT, Sewa Penempatan
                                                       Perangkat di Gedung Inti Center dan Wisma
1483   26-Apr-23     MANDIRI IDR       1220011559559   Anugraha periode 19 Mar 2023 - 18 Mar 2024                 24,250,000    24,010,000    2,640,000     2,400,000        24,250,000
                                                       INDOKARYA SUKSES BERSAMA, PT, Biaya atas
                                                       Pemakaian Listrik di Apartemen Pluit Sea View
1484   26-Apr-23     MANDIRI IDR       1220011559559   Periode 23 Feb 2023 - 27 Mar 2023                           1,066,544     1,185,048          -         118,504         1,066,544
                                                       INTERNETINDO DATA CENTRA INDONESIA, PT, Sewa
                                                       Crossconnect 3D 4 UTP dan 3D 3 FO periode Mar
1485   26-Apr-23     MANDIRI IDR       1220011559559   2023                                                        2,943,000     2,700,000     297,000         54,000         2,943,000
                                                       INTILAND DEVELOPMENT TBK, PT (SURABAYA), Sewa
                                                       Penempatan Perangkat Shaft Kabel FO 4 Core di
                                                       Gedung Intiland Surabaya periode 01 Nov 2022 - 31
1486   26-Apr-23     MANDIRI IDR       1220011559559   Okt 2023                                                    2,777,500     2,750,000     302,500        275,000         2,777,500

                                                       JALA LINTAS MEDIA, PT, Sewa Local Loop 10Mbps
1487   26-Apr-23     MANDIRI IDR       1220011559559   IDC to PT Darya Varia Laboratoria periode Mar 2023          2,180,000     2,000,000     220,000         40,000         2,180,000
                                                       JALA LINTAS MEDIA, PT, Sewa Local Loop 10 Mbps &
                                                       20 Mbps Tenant Citeureup dan Gunung Putri (VLAN)
1488   26-Apr-23     MANDIRI IDR       1220011559559   periode Mar 2023                                            9,265,000     8,500,000     935,000        170,000         9,265,000
                                                       MEDIA NUSANTARA DATA GLOBAL, PT, Sewa
                                                       Crossconnect Fiber Optic in Data Center CDCI - 1 Port
1489   26-Apr-23     MANDIRI IDR       1220011559559   REQ/21FEB19/00000008 periode Feb 2023                       1,635,000     1,500,000     165,000         30,000         1,635,000
Page 86
      TANGGAL
    PENGELUARAN                     NOMOR REKENING
       DI BANK  REKENING BANK         BANK YANG                                                               NILAI MUTASI                     NILAI YANG DIBAYARKAN
NO.  STATEMENT YANG DIGUNAKAN         DIGUNAKAN               NAMA VENDOR DAN KETERANGAN                         BANK            DPP           PPN             PPh       NET DIBAYARKAN
                                                      PERSADA BATAVIA MANDIRI, PT, Biaya Pengiriman
                                                      Material Cable, Plate Setting, Switch DCN dari WH
1490   26-Apr-23     MANDIRI IDR      1220011559559   Serpong ke Office Sidoarjo & WH Bali                        7,407,725      7,475,000       82,225        149,500         7,407,725
                                                      PERSADA BATAVIA MANDIRI, PT, Biaya Pengiriman
                                                      Material Subduct 40/34MM dari WH Serpong ke WH
1491   26-Apr-23     MANDIRI IDR      1220011559559   Bali                                                        6,243,300      6,300,000       69,300        126,000         6,243,300
                                                      PPPSRS PERKANTORAN EKSEKUTIF SATRIO TOWER,
                                                      Sewa Penempatan Perangkat di Gedung Satrio Tower
1492   26-Apr-23     MANDIRI IDR      1220011559559   periode 08 Des 2022 - 07 Des 2023                          75,760,000     75,010,000     8,250,000     7,500,000        75,760,000
                                                      PRIMACOM INTERBUANA, PT, Biaya Instalasi Sewa
                                                      Layanan Koneksi Backhaul 1500Mbps Wisma
1493   26-Apr-23     MANDIRI IDR      1220011559559   Bumiputera (BBU) - Balitower Regional Jawa Barat            3,270,000      3,000,000      330,000         60,000         3,270,000
                                                      PRIMACOM INTERBUANA, PT, Sewa Layanan Koneksi
                                                      Backhaul 1500Mbps Wisma Bumiputera (BBU) -
                                                      Balitower Regional Jawa Barat periode 18 - 30 Nov
1494   26-Apr-23     MANDIRI IDR      1220011559559   2022 dan Des 2022                                           4,687,000      4,300,000      473,000         86,000         4,687,000

                                                      PRIMACOM INTERBUANA, PT, Sewa Layanan Koneksi
                                                      Backhaul 1500Mbps Wisma Bumiputera (BBU) -
1495   26-Apr-23     MANDIRI IDR      1220011559559   Balitower Regional Jawa Barat periode Feb 2023              3,270,000      3,000,000      330,000         60,000         3,270,000

                                                      PRIMACOM INTERBUANA, PT, Sewa Layanan Koneksi
                                                      Backhaul 1500Mbps Wisma Bumiputera (BBU) -
1496   26-Apr-23     MANDIRI IDR      1220011559559   Balitower Regional Jawa Barat periode Jan 2023              3,270,000      3,000,000      330,000         60,000         3,270,000
                                                      SERPONG MAS TELEMATIKA, PT, Sewa Local Loop
                                                      Dedicated dan Broadband West BSD untuk 46 Tenant
1497   26-Apr-23     MANDIRI IDR      1220011559559   periode Jan 2023                                           63,412,544     58,176,645     6,399,431     1,163,532        63,412,544

                                                      SMART MILENIUM EFFISIENSI, PT, Biaya Pemakaian
1498   26-Apr-23     MANDIRI IDR      1220011559559   Pulsa Telepon Pelanggan Corporate periode Jan 2023          1,942,149      1,749,685      192,464            -           1,942,149
                                                      TEKNOVATUS SOLUSI SEJAHTERA, PT, Biaya Sewa
                                                      MMR Connect Equipment Rack to MMR Rack 5
1499   26-Apr-23     MANDIRI IDR      1220011559559   periode 14 Agust 2022 - 13 Agust 2023                       3,270,000      3,000,000      330,000         60,000         3,270,000
                                                      TEKNOVATUS SOLUSI SEJAHTERA, PT, Biaya Sewa
                                                      MMR Connect Equipment Rack to OTB periode Juni
1500   26-Apr-23     MANDIRI IDR      1220011559559   2022 - Mei 2023                                             3,270,000      3,000,000      330,000         60,000         3,270,000
                                                      TIRTA INDORAYA LOGISTICS, PT, Biaya Pengiriman
                                                      Material Battery 48V 80AH Narada dari Nexwave ke
1501   26-Apr-23     MANDIRI IDR      1220011559559   Office Pluit                                                5,886,000      5,400,000      594,000        108,000         5,886,000
                                                      BERGAS PAMUNGKAS, Tagihan 100% atas Pekerjaan
                                                      Perapihan Kabel dan Tiang Hasil Survey Patroli
                                                      Cluster Cipinang Muara RW03 site MP Cipinang Besar
1502   26-Apr-23     MANDIRI IDR      1220011559559   Selatan-002                                                 1,624,066      1,755,747           -         131,681         1,624,066
                                                      BENTENG ANUGERAH ASIH, PT, Biaya Pengiriman
                                                      Material Pole Fiber Optic Round 9M dari PT
1503   26-Apr-23   MANDIRI IDR     1220011559559      Konstruksi Baja Cikande ke WH Bali                         12,337,950     12,450,000      136,950        249,000        12,337,950
                                                      KEMENTERIAN KOMUNIKASI DAN INFORMATIKA RI,
                                                      Pembayaran Kewajiban Kontribusi KPU/USO Tahun
1504   27-Apr-23     MANDIRI IDR      1220011559559   Buku 2022                                               7,645,939,554   7,645,939,554          -             -        7,645,939,554
                                                      KEMENTERIAN KOMUNIKASI DAN INFORMATIKA RI,
                                                      Pembayaran Kewajiban BHP Telekomunikasi Tahun
1505   27-Apr-23     MANDIRI IDR      1220011559559   Buku 2022                                               3,058,375,821   3,058,375,821          -             -        3,058,375,821
                                                      ASOSIASI PENYELENGGARA JASA INTERNET
                                                      INDONESIA, Biaya Penempatan Rak (S2) di APJII
1506   28-Apr-23     MANDIRI IDR      1220011559559   Periode Apr 2023                                           10,900,000     10,000,000     1,100,000       200,000        10,900,000

                                                      BINAJASA SUMBER SARANA, PT, Reimbursement
1507   28-Apr-23     MANDIRI IDR      1220011559559   Salary Outsource Div. Direct Sales Periode Mar 2023        71,258,978     70,787,064      576,783        104,869        71,258,978

                                                      BINAJASA SUMBER SARANA, PT, Reimbursement
1508   28-Apr-23     MANDIRI IDR      1220011559559   Insentif Outsource Div. Direct Sales Periode Feb 2023      31,047,554     30,841,940      251,305         45,691        31,047,554
                                                      CIRCLECOM NUSANTARA INDONESIA, PT, Biaya
                                                      Tagihan Revenue Sharing di Kawasan Kelapa Gading
                                                      Square (MOI) Berdasarkan Penggunaan Jaringan
                                                      Internet Residential periode Juli - Sept 2022 dan
1509   28-Apr-23     MANDIRI IDR      1220011559559   Corporate Agust 2021 - Sept 2022                            4,232,541      3,883,065      427,137         77,661         4,232,541
                                                      DITJEN POSTEL, BHP Frekuensi Radio Periode 28 Mei
                                                      2023 s.d 27 Mei 2024 - No. Aplikasi :
1510   28-Apr-23     MANDIRI IDR      1220011559559   02377189052021                                             14,203,714     14,203,714           -             -          14,203,714
                                                      DWIBINA PRIMA, PT, Biaya atas Pemakaian Listrik di
1511   28-Apr-23     MANDIRI IDR      1220011559559   Wisma BSG periode Mar 2023                                     86,329         85,474        9,402          8,547            86,329
                                                      EQUINIX SINGAPORE PTE LTD, Biaya Sewa Rack
                                                      Colocation dan Interkoneksi Equinix Singapore
1512   28-Apr-23    SINARMAS IDR       0000240408     periode Mar 2023                                          105,993,160    105,993,160           -             -         105,993,160
                                                      INDOSAT TBK, PT, Sewa Domestik Link Platinum 10
1513   28-Apr-23     MANDIRI IDR      1220011559559   Mbps periode Mar 2023                                       4,360,000      4,000,000      440,000         80,000         4,360,000
                                                      JAKARTA INTILAND, PT, Sewa Penempatan Perangkat
                                                      di Gedung Mall Ramayana Karawang periode 22 Apr
1514   28-Apr-23       BCA IDR         3193058058     2023 - 21 Apr 2024                                         10,110,000     10,010,000     1,100,000     1,000,000        10,110,000
                                                      LINK NET TBK, PT, Link Net IDC D3 Jakarta to NIX Bali
1515   28-Apr-23     MANDIRI IDR      1220011559559   B00573-009 10Gbps periode Mar 2023                        201,650,000    185,000,000    20,350,000     3,700,000       201,650,000
                                                      LINK NET TBK, PT, Link Net IDC Duren Tiga (3D) to
                                                      Omadata Intiland Surabaya Tower LT.3 B00573-014
1516   28-Apr-23     MANDIRI IDR      1220011559559   2Gbps periode Mar 2023                                     30,520,000     28,000,000     3,080,000       560,000        30,520,000
                                                      MEGA AKSES PERSADA, PT, Sewa Layanan Jabalink
                                                      500Mbps (Fiberstar) Intercity Jakarta - Diskominfo
1517   28-Apr-23     MANDIRI IDR      1220011559559   Cirebon periode Mar 2023                                    8,720,000      8,000,000      880,000        160,000         8,720,000

                                                      MEGA AKSES PERSADA, PT, Sewa Layanan Jabalink
                                                      1Gbps P2P dari IDC Duren Tiga ke Jabalink Bali Tower
1518   28-Apr-23     MANDIRI IDR      1220011559559   Surabaya Omadata Center periode Mar 2023                   25,070,000     23,000,000     2,530,000       460,000        25,070,000
                                                      MEGA AKSES PERSADA, PT, Sewa Layanan Jabalink
                                                      500Mbps (Fiberstar) Jakarta - Bandung periode Mar
1519   28-Apr-23     MANDIRI IDR      1220011559559   2023                                                        9,265,000      8,500,000      935,000        170,000         9,265,000
Page 87
      TANGGAL
    PENGELUARAN                   NOMOR REKENING
       DI BANK  REKENING BANK       BANK YANG                                                              NILAI MUTASI                   NILAI YANG DIBAYARKAN
NO.  STATEMENT YANG DIGUNAKAN       DIGUNAKAN               NAMA VENDOR DAN KETERANGAN                        BANK          DPP           PPN             PPh       NET DIBAYARKAN
                                                   MENARA CAPITAL INDONUSA, PT, Biaya atas
                                                   Pemakaian Listrik Gedung Palma Tower lt. 11
1520   28-Apr-23   MANDIRI IDR     1220011559559   periode Mar 2023                                             103,048       102,027       11,223         10,202           103,048
                                                   MENARA CAPITAL INDONUSA, PT, Biaya atas
                                                   Pemakaian Listrik Gedung Palma Tower lt. B1
1521   28-Apr-23   MANDIRI IDR     1220011559559   periode Mar 2023                                             103,048       102,027       11,223         10,202           103,048
                                                   MORA TELEMATIKA INDONESIA, PT, Sewa New Link
                                                   IDREN 100Mbps - NDC Jatinegara periode 07.02.2023
1522   28-Apr-23   MANDIRI IDR     1220011559559   - 06.03.2023                                                9,810,000     9,000,000     990,000        180,000         9,810,000
                                                   MORA TELEMATIKA INDONESIA, PT, Sewa New Link
                                                   IDREN 100Mbps - NDC Jatinegara periode 07.01.2023
1523   28-Apr-23   MANDIRI IDR     1220011559559   - 06.02.2023                                                9,810,000     9,000,000     990,000        180,000         9,810,000
                                                   MORA TELEMATIKA INDONESIA, PT, Sewa New Link
                                                   IDREN 100Mbps - NDC Jatinegara periode 07.12.2022
1524   28-Apr-23   MANDIRI IDR     1220011559559   - 06.01.2023                                                9,810,000     9,000,000     990,000        180,000         9,810,000
                                                   NTT INDONESIA, PT, Biaya Cross-Connect Rack S2
                                                   APJII Lantai 1 ke NTT Lantai 3A (Interkoneksi
1525   28-Apr-23   MANDIRI IDR     1220011559559   Facebook) periode Mar 2023                                 10,900,000    10,000,000    1,100,000       200,000        10,900,000
                                                   NTT INDONESIA, PT, Sewa NTT Fiber Connect (XC
1526   28-Apr-23   MANDIRI IDR     1220011559559   Inter DC Akamai - APJII) periode Mar 2023                   7,085,000     6,500,000     715,000        130,000         7,085,000
                                                   NTT INDONESIA, PT, Sewa Crossconnect Establish
                                                   NTT Ether 150 Mbps At Cargill Level 26 W 46 periode
1527   28-Apr-23   MANDIRI IDR     1220011559559   Mar 2023                                                   14,715,000    13,500,000    1,485,000       270,000        14,715,000
                                                   PENGELOLA PUSAT BELANJA, PT, Biaya atas
                                                   Pemakaian Listrik di Mall Bassura periode 16 Feb
1528   28-Apr-23   MANDIRI IDR     1220011559559   2022 - 15 Mar 2023                                           756,976       749,479       82,444         74,947           756,976
                                                   POWER TELECOM, PT, Biaya Sewa Dark Fiber 2Core
                                                   Segmen Tangerang HH Plaza SumMarecon - HH
                                                   Teknovatus, HH Teknovatus - MP Pondok Pinang
1529   28-Apr-23   MANDIRI IDR     1220011559559   periode Apr 2023                                           20,339,400    18,660,000    2,052,600       373,200        20,339,400

                                                   POWER TELECOM, PT, iaya Sewa Dark Fiber Section
                                                   20 (2.562KM) Kedungbadak-008 - Tanah sareal-005,
                                                   Section 12 (1.780KM) Kencana-001 - Tanah Sareal-
                                                   005, Section 16 (1KM) Tanah Sareal-002 - Tanah
1530   28-Apr-23   MANDIRI IDR     1220011559559   Sareal-005, Section 17 (6.090KM) periode Apr 2023          10,203,981     9,361,450    1,029,760       187,229        10,203,981
                                                   POWER TELECOM, PT, Biaya Sewa Dark Fiber Section
                                                   25 3.965KM Pasirjaya-001 - Paledang-001 periode
1531   28-Apr-23     BCA IDR        3193058058     Apr 2023                                                    3,025,295     2,775,500     305,305         55,510         3,025,295
                                                   POWER TELECOM, PT, Sewa Dark Fiber Section 29
                                                   1.359KM Tanah Baru-007 - Tegalgundil-010 periode
1532   28-Apr-23     BCA IDR        3193058058     Apr 2023                                                    1,036,154      950,600      104,566         19,012         1,036,154
                                                   POWER TELECOM, PT, Biaya Sewa Dark Fiber Section
                                                   26 2.270KM Cikaret-001 - Pasir Jaya-001 periode Apr
1533   28-Apr-23     BCA IDR        3193058058     2023                                                        1,732,010     1,589,000     174,790         31,780         1,732,010
                                                   POWER TELECOM, PT, Biaya Sewa Dark Fiber 2core
                                                   segmen HH Jl. Raya Serpong - HH Apartement
1534   28-Apr-23     BCA IDR        3193058058     Amazana Residence periode Apr 2023                          6,356,880     5,832,000     641,520        116,640         6,356,880
                                                   POWER TELECOM, PT, Biaya Sewa Dark Fiber 4core
                                                   segmen Mall Karawang - Karawang Regency periode
1535   28-Apr-23     BCA IDR        3193058058     Apr 2023                                                    9,679,200     8,880,000     976,800        177,600         9,679,200
                                                   PPPSRSS SAHID SUDIRMAN CENTER, Biaya atas
                                                   Pemakaian Listrik di Sahid Sudirman Centre Lt. 29
1536   28-Apr-23   MANDIRI IDR     1220011559559   periode 21 Feb 2023 - 20 Mar 2023                            215,843       213,706       23,507         21,370           215,843
                                                   PPPSRSS SAHID SUDIRMAN CENTER, Tagihan
                                                   Revenue Sharing Bali Fiber di Sahid Sudirman Center
1537   28-Apr-23   MANDIRI IDR     1220011559559   periode Oktober 2022 - Desember 2022                       32,894,373    32,568,686    3,582,555     3,256,868        32,894,373
                                                   PPPSRSS SAHID SUDIRMAN CENTER, Biaya atas
                                                   Pemakaian Listrik di Sahid Sudirman Centre Lt. 46
1538   28-Apr-23   MANDIRI IDR     1220011559559   periode 21 Feb 2023 - 20 Mar 2023                            215,843       213,706       23,507         21,370           215,843
                                                   PPPSRSS SAHID SUDIRMAN CENTER, Biaya atas
                                                   Pemakaian Listrik di Sahid Sudirman Centre Lt. 11
1539   28-Apr-23   MANDIRI IDR     1220011559559   periode 21 Feb 2023 - 20 Mar 2023                            215,843       213,706       23,507         21,370           215,843
                                                   PRATAMA INTI SORSING, PT, Reimbursement Salary
                                                   Outsource Div. Direct Sales Area Bali Periode Jan
1540   28-Apr-23   MANDIRI IDR     1220011559559   2023                                                        3,219,509     3,198,188      26,059          4,738         3,219,509
                                                   PRATAMA INTI SORSING, PT, Reimbursement Insentif
                                                   Outsource Div. Direct Sales Area Bali Periode Des
1541   28-Apr-23   MANDIRI IDR     1220011559559   2022                                                        1,141,539     1,133,978       9,240          1,679         1,141,539
                                                   QUIROS NETWORKS, PT, Biaya Pemakaian Telepon
1542   28-Apr-23     BCA IDR        3193058058     Call Center Bulan Feb 2023                                 11,852,282    10,677,732    1,174,550           -          11,852,282
                                                   SMART MILENIUM EFFISIENSI, PT, Biaya Pemakaian
                                                   Pulsa Telepon Pelanggan Corporate periode Feb
1543   28-Apr-23   MANDIRI IDR     1220011559559   2023                                                        1,904,384     1,715,662     188,722            -           1,904,384
                                                   SMARTFREN TELECOM TBK, PT, Internet Bandwith
1544   28-Apr-23   MANDIRI IDR     1220011559559   5site @50 Mbps (I: 8000001096)                            147,150,000   135,000,000   14,850,000     2,700,000       147,150,000
                                                   SMARTFREN TELECOM TBK, PT, Internet Bandwith
1545   28-Apr-23   MANDIRI IDR     1220011559559   5site @50 Mbps (I: 8000001093)                            147,150,000   135,000,000   14,850,000     2,700,000       147,150,000
                                                   SMARTFREN TELECOM TBK, PT, Tagihan Telepon
                                                   Divisi Marketing Communications dan Contact
1546   28-Apr-23   MANDIRI IDR     1220011559559   Center Bulan Mar 2023                                          40,123       36,147        3,976            -              40,123
                                                   SUKA DUKA GIRI HILL, Biaya Management Fee atas
                                                   Revenue Sharing periode Februari 2023 di Suka Duka
1547   28-Apr-23   MANDIRI IDR     1220011559559   Raya Hill - Perumahan Giri Hill                             2,317,061     2,413,605          -          96,544         2,317,061

                                                   SUKA DUKA RAYA KAMPIAL, Biaya Management Fee
                                                   atas Revenue Sharing periode Januari 2023 di Suka
1548   28-Apr-23   MANDIRI IDR     1220011559559   Duka Raya Kampial - Perumahan Raya Kampial                  4,115,854     4,287,347          -         171,493         4,115,854
                                                   TELEKOMUNIKASI SELULAR, PT, Biaya Paket Data
1549   28-Apr-23   MANDIRI IDR     1220011559559   Mikrotik Regional Jawa Timur Periode April 2023              582,750       525,000       57,750            -             582,750
                                                   TELIA CARRIER SINGAPORE PTE LTD, Biaya Sewa Telia
1550   28-Apr-23   SINARMAS USD     0000670707     IP Transit 3Gbps Periode Mar 2023                          35,455,200    35,455,200          -             -          35,455,200

                                                   TRIMITRA PUTRA MANDIRI, PT, Reimbursement
1551   28-Apr-23   MANDIRI IDR     1220011559559   Insentif Outsource Div. Direct Sales Periode Feb 2023      33,904,254    33,679,722     274,427         49,895        33,904,254
Page 88
      TANGGAL
    PENGELUARAN                     NOMOR REKENING
       DI BANK  REKENING BANK         BANK YANG                                                             NILAI MUTASI                   NILAI YANG DIBAYARKAN
NO.  STATEMENT YANG DIGUNAKAN         DIGUNAKAN               NAMA VENDOR DAN KETERANGAN                       BANK          DPP           PPN             PPh       NET DIBAYARKAN

                                                      TRIMITRA PUTRA MANDIRI, PT, Reimbursement
1552   28-Apr-23     MANDIRI IDR      1220011559559   Salary Outsource Div. Direct Sales Periode Mar 2023     126,530,292   125,692,342    1,024,160       186,210       126,530,292
                                                      CYBERINDO ADITAMA, PT, Biaya Crossconnect FO
                                                      CBN Tenant PT Keb Hana Bank KCP Central Park
1553   28-Apr-23   MANDIRI IDR     1220011559559      Bulan Mar 2023                                            3,052,000     2,800,000     308,000         56,000         3,052,000
                                                      CYBERINDO ADITAMA, PT, Biaya Instalasi Sewa Local
                                                      Loop 100Mbps site Menara Jamsostek untuk Tenant
1554   28-Apr-23   BCA IDR         3193058058         PT Pamerindo Indonesia periode Mar 2023                  10,900,000    10,000,000    1,100,000       200,000        10,900,000
                                                      CYBERINDO ADITAMA, PT, Biaya Crossconnect FO
                                                      CBN Tenant PT Keb Hana Bank KCP Central Park
1555   28-Apr-23   BCA IDR         3193058058         Bulan Jan 2023                                            3,052,000     2,800,000     308,000         56,000         3,052,000
                                                      MORA TELEMATIKA INDONESIA, PT, Sewa
                                                      Colocation, Kabel Shaft, Colocation OTB 2U & Biaya
                                                      Interkoneksi antar Rak MMR periode 01.02.2023 -
1556   28-Apr-23   MANDIRI IDR     1220011559559      28.02.2023                                                9,265,000     8,500,000     935,000        170,000         9,265,000
                                                      MORA TELEMATIKA INDONESIA, PT, Sewa
                                                      Colocation, Kabel Shaft, Colocation OTB 2U & Biaya
                                                      Interkoneksi antar Rak MMR periode 01.01.2023 -
1557   28-Apr-23   MANDIRI IDR     1220011559559      31.01.2023                                                9,265,000     8,500,000     935,000        170,000         9,265,000
                                                      MORA TELEMATIKA INDONESIA, PT, Biaya
                                                      Interkoneksi dari OTB BTS ke Rack BTS NDC
1558   28-Apr-23   MANDIRI IDR     1220011559559      Jatinegara periode 01.02.2023 - 28.02.2023                1,090,000     1,000,000     110,000         20,000         1,090,000
                                                      MORA TELEMATIKA INDONESIA, PT, Biaya
                                                      Interkoneksi dari OTB BTS ke Rack BTS NDC
1559   28-Apr-23   MANDIRI IDR     1220011559559      Jatinegara periode 01.01.2023 - 31.01.2023                1,090,000     1,000,000     110,000         20,000         1,090,000
                                                      MORA TELEMATIKA INDONESIA, PT, Biaya
                                                      Interkoneksi dari OTB BTS ke Rack BTS NDC
1560   28-Apr-23   MANDIRI IDR     1220011559559      Jatinegara periode 01.12.2022 - 31.12.2022                1,090,000     1,000,000     110,000         20,000         1,090,000
                                                      MORA TELEMATIKA INDONESIA, PT, Biaya Sewa Dark
                                                      Core FO dari MTI Graha 9 ke NDC Jatinegara periode
1561   28-Apr-23   MANDIRI IDR     1220011559559      26.12.2022 - 25.01.2023                                   8,011,500     7,350,000     808,500        147,000         8,011,500
                                                      MORA TELEMATIKA INDONESIA, PT, Sewa Core FO
                                                      dari MP Pegangsaan Dua ke NDC Jatinegara periode
1562   28-Apr-23   MANDIRI IDR     1220011559559      13.11.2022 - 12.12.2022                                   4,578,000     4,200,000     462,000         84,000         4,578,000
                                                      MORA TELEMATIKA INDONESIA, PT, Sewa Metro-E
                                                      1.5 Gbps NDC Jatinegara - Pop BTS Karawang periode
1563   28-Apr-23   MANDIRI IDR     1220011559559      18.12.2022 - 17.01.2023                                  42,510,000    39,000,000    4,290,000       780,000        42,510,000
                                                      MORA TELEMATIKA INDONESIA, PT, Sewa Metro-E
                                                      1.5 Gbps NDC Jatinegara - Pop BTS Karawang periode
1564   28-Apr-23   MANDIRI IDR     1220011559559      18.11.2022 - 17.12.2022                                  42,510,000    39,000,000    4,290,000       780,000        42,510,000
                                                      MORA TELEMATIKA INDONESIA, PT, Biaya Instalasi
1565   28-Apr-23   MANDIRI IDR     1220011559559      New Link IDREN 100Mbps - NDC Jatinegara                   3,270,000     3,000,000     330,000         60,000         3,270,000
                                                      POWER TELECOM, PT, Sewa Dark Fiber Segmen 11
                                                      (2.037KM) dan (2.038KM) Tegal Gundil-010 - Tanah
                                                      Sareal-005, Section 10 (2.830KM) & (2.831KM)
1566   28-Apr-23   BCA IDR         3193058058         Narasoma - Tanah Sareal-005 periode Apr 2023              3,714,284     3,407,600     374,836         68,152         3,714,284
                                                      SENAYAN TRIKARYA SEMPANA, PT, Biaya
                                                      Penempatan Sewa Perangkat Telekomunikasi
                                                      berdasarkan Revenue Sharing periode Okt - Des 2022
1567   28-Apr-23   MANDIRI IDR     1220011559559      di Gedung Plaza Senayan                                  21,935,816    21,718,629    2,389,049     2,171,862        21,935,816
                                                      ADHI PERSADA PROPERTY, PT, Tagihan Revenue
                                                      Sharing Bali Fiber di Apartement Grand Dhika City
1568   02-May-23     MANDIRI IDR      1220011559559   Periode Juli 2022 - September 2022                        1,155,292     1,059,901     116,589         21,198         1,155,292
                                                      ADHI PERSADA PROPERTY, PT, Tagihan Revenue
                                                      Sharing Bali Fiber di Apartement Grand Dhika City
1569   02-May-23     MANDIRI IDR      1220011559559   Periode Juni 2021 - September 2021                         164,746       151,142       16,626          3,022           164,746
                                                      ADHI PERSADA PROPERTY, PT, Tagihan Revenue
                                                      Sharing Bali Fiber di Apartement Grand Dhika City
1570   02-May-23     MANDIRI IDR      1220011559559   Periode Februari 2021 - Mei 2021                           139,084       127,600       14,036          2,552           139,084
                                                      ADHI PERSADA PROPERTY, PT, Tagihan Revenue
                                                      Sharing Bali Fiber di Apartement Grand Dhika City
1571   02-May-23     MANDIRI IDR      1220011559559   Periode Oktober 2020 - Januari 2021                        267,315       245,242     26,977.00         4,904           267,315
                                                      ADHI PERSADA PROPERTY, PT, Tagihan Revenue
                                                      Sharing Bali Fiber di Apartement Grand Dhika City
1572   02-May-23     MANDIRI IDR      1220011559559   Periode April 2022 - Juni 2022                             555,688       509,805     56,079.00        10,196           555,688
                                                      ADHI PERSADA PROPERTY, PT, Tagihan Revenue
                                                      Sharing Bali Fiber di Apartement Grand Dhika City
1573   02-May-23     MANDIRI IDR      1220011559559   Periode Oktober 2021 - Desember 2021                       314,574       288,599     31,746.00         5,771           314,574
                                                      ADHI PERSADA PROPERTY, PT, Tagihan Revenue
                                                      Sharing Bali Fiber di Apartement Grand Dhika City
1574   02-May-23     MANDIRI IDR      1220011559559   Periode Oktober 2022 - Desember 2022                      1,025,699      941,008    103,511.00        18,820         1,025,699
                                                      ADHI PERSADA PROPERTY, PT, Tagihan Revenue
                                                      Sharing Bali Fiber di Apartement Grand Dhika City
1575   02-May-23     MANDIRI IDR      1220011559559   Periode Januari 2022 - Maret 2022                          490,944       450,407       49,545          9,008           490,944
                                                      BUMI MULIA PERKASA DEVELOPMENT, PT, Biaya atas
                                                      Pemakaian Listrik di Gedung Atrium Mulia periode
1576   02-May-23     MANDIRI IDR      1220011559559   Mar 2023                                                   232,423       230,122       25,313         23,012           232,423
                                                      CENTRA SARANA DATA, PT, Tagihan Revenue Sharing
                                                      Bali Fiber di Gedung UOB Plaza (Chubb Square)
1577   02-May-23     MANDIRI IDR      1220011559559   periode Oktober - Desember 2022                           7,586,400     6,960,000     765,600        139,200         7,586,400
                                                      GRIYA MURIA KENCANA, PT, Tagihan Revenue
                                                      Sharing periode Februari 2023 atas Penempatan
1578   02-May-23     MANDIRI IDR      1220011559559   Perangkat Telekomunikasi di Gedung Prince Center           737,300       730,000       80,300         73,000           737,300
                                                      INDOBUZZ REPUBLIK DIGITAL, PT, Biaya Buzzer
                                                      Instagram & Facebook Balifiber periode Jan - Feb
1579   02-May-23     MANDIRI IDR      1220011559559   2023                                                      4,360,000     4,000,000     440,000         80,000         4,360,000

                                                      INDOBUZZ REPUBLIK DIGITAL, PT, Biaya Buzzer
1580   02-May-23     MANDIRI IDR      1220011559559   Instagram Balifiber sebanyak 152 Comment Organik           497,040       456,000       50,160          9,120           497,040

                                                      INFRASTRUKTUR BISNIS SEJAHTERA, PT, Jasa Penguat
                                                      Sinyal untuk Tenant di Gedung The Plaza Shopping
1581   02-May-23     MANDIRI IDR      1220011559559   Center Berdasarkan Profit Sharing Februari 2023          23,088,000    20,800,000    2,288,000           -          23,088,000
Page 89
      TANGGAL
    PENGELUARAN                   NOMOR REKENING
       DI BANK  REKENING BANK       BANK YANG                                                             NILAI MUTASI                 NILAI YANG DIBAYARKAN
NO.  STATEMENT YANG DIGUNAKAN       DIGUNAKAN              NAMA VENDOR DAN KETERANGAN                        BANK         DPP          PPN             PPh       NET DIBAYARKAN
                                                   INTI ALGORITMA PERDANA, PT, Sewa Alat / kabel
                                                   Fiber Optic Pass Through PT Darya Varia Laboratoria
1582   02-May-23   MANDIRI IDR     1220011559559   periode Okt - Des 2022                                    32,700,000   30,000,000   3,300,000       600,000        32,700,000
                                                   KHARISMA INTAN PROPERTI, PT, Biaya atas
                                                   Pemakaian Listrik di Scientia Business Park periode
1583   02-May-23   MANDIRI IDR     1220011559559   Mar 2023                                                    175,381      173,644      19,101         17,364           175,381

                                                   LIZA CHRISTINA GARMENT INDUSTRY, PT, Biaya atas
1584   02-May-23   MANDIRI IDR     1220011559559   Pemakaian Listrik di Unity Building periode Mar 2023        505,000      500,000      55,000         50,000           505,000
                                                   MEKAR PRANA INDAH, PT, Biaya atas Pemakaian
1585   02-May-23   MANDIRI IDR     1220011559559   Listrik di Menara Bidakara 2 periode Mar 2023               270,821      268,139      29,495         26,813           270,821
                                                   MENARA DUTA, PT, Biaya atas Pemakaian Listrik
1586   02-May-23   MANDIRI IDR     1220011559559   Menara Duta Periode Mar 2023                                128,406      127,134      13,985         12,713           128,406
                                                   MOXCAL TEKNOLOGI, PT, Tagihan Sewa Modul
                                                   Aplikasi Call Center Centerix periode 17 Mar 2023 -
1587   02-May-23   MANDIRI IDR     1220011559559   16 Apr 2023 (Additional 10qty)                            10,900,000   10,000,000   1,100,000       200,000        10,900,000
                                                   MOXCAL TEKNOLOGI, PT, Tagihan Sewa Modul
1588   02-May-23   MANDIRI IDR     1220011559559   Aplikasi Call Center Centerix periode Apr 2023            10,900,000   10,000,000   1,100,000       200,000        10,900,000
                                                   MOXCAL TEKNOLOGI, PT, Tagihan Sewa Modul
                                                   Aplikasi Call Center Centerix periode Apr 2023
1589   02-May-23   MANDIRI IDR     1220011559559   (Additional 5qty)                                          5,450,000    5,000,000    550,000        100,000         5,450,000
                                                   MOXCAL TEKNOLOGI, PT, Tagihan Sewa Modul
                                                   Aplikasi Call Center Centerix periode Apr 2023
1590   02-May-23   MANDIRI IDR     1220011559559   (Additional 10qty)                                        10,900,000   10,000,000   1,100,000       200,000        10,900,000
                                                   MUGI GRIYATAMA, PT, Sewa Penempatan Perangkat
                                                   di Gedung Mugi Griyatama periode 01 Feb 2023 - 31
1591   02-May-23   MANDIRI IDR     1220011559559   Jan 2024                                                  18,341,500   18,160,000   1,996,500     1,815,000        18,341,500

                                                   MULIA CEMERLANG DIAN PERSADA, PT, Biaya atas
1592   02-May-23   MANDIRI IDR     1220011559559   Pemakaian Listrik di Wisma GKBI periode Maret 2023          581,059      575,305      63,284         57,530           581,059
                                                   MUSTIKA RATU CENTRE, PT, Biaya atas Pemakaian
                                                   Listrik di Gedung Mustika Ratu Centre periode Mar
1593   02-May-23   MANDIRI IDR     1220011559559   2023                                                        179,490      177,713      19,548         17,771           179,490
                                                   NICO CENTRAL, PT, Biaya atas Pemakaian Listrik di
1594   02-May-23   MANDIRI IDR     1220011559559   Gedung Sona Topas Tower Periode Mar 2023                    352,843      349,350      38,428         34,935           352,843
                                                   PENGELOLA LANDMARK PLUIT, PT, Biaya atas
                                                   Pemakaian Listrik Landmark Pluit (GF-B) periode 16
1595   02-May-23   MANDIRI IDR     1220011559559   Februari 2022 - 15 Maret 2023                               132,366      131,055      14,416         13,105           132,366
                                                   PENGELOLA LANDMARK PLUIT, PT, Biaya atas
                                                   Pemakaian Listrik Landmark Pluit (GF-A) periode 16
1596   02-May-23   MANDIRI IDR     1220011559559   Februari 2022 - 15 Maret 2023                               152,056      150,550      16,561         15,055           152,056
                                                    PENGELOLA LANDMARK PLUIT, PT, Biaya atas
                                                   Pemakaian Listrik Landmark Pluit (GF-D) periode 16
1597   02-May-23   MANDIRI IDR     1220011559559   Februari 2022 - 15 Maret 2023                               120,307      119,115      13,103         11,911           120,307
                                                   PENGELOLA LANDMARK PLUIT, PT, Biaya atas
                                                   Pemakaian Listrik Landmark Pluit (GF-E) periode 16
1598   02-May-23   MANDIRI IDR     1220011559559   Februari 2022 - 15 Maret 2023                               156,635      155,084      17,059         15,508           156,635
                                                   PENGELOLA MASPION PLAZA GUNUNG SAHARI,
                                                   Biaya atas Pemakaian Listrik di Gedung Maspion
1599   02-May-23   MANDIRI IDR     1220011559559   Plaza Lt. 5A periode Maret 2023                             177,655      197,394          -          19,739           177,655
                                                   PERHIMPUNAN PEMILIK DAN PENGHUNI SATUAN
                                                   RUMAH SUSUN HUNIAN DAN NON HUNIAN MAL &
                                                   KONDOMINIUM TAMAN ANGGREK, Biaya Sewa
                                                   Penempatan Perangkat Telekomunikasi di Mall &
                                                   Kondominium Taman Anggrek Berdasarkan Profit
1600   02-May-23   MANDIRI IDR     1220011559559   Sharing Periode Maret 2023                                13,712,579   15,236,198         -       1,523,619        13,712,579
                                                   PERHIMPUNAN PENGHUNI WISMA STACO, Biaya
                                                   atas Pemakaian Listrik di Wisma Staco periode Mar
1601   02-May-23   MANDIRI IDR     1220011559559   2023                                                        132,526      147,251          -          14,725           132,526
                                                   BIBIT, Mr, pekerjaan Relokasi Kabel FO Koperasi Giri
                                                   Kusuma Sari karena renovasi di jalur kabel existing
                                                   (PO Rp.4.024.555,-Potongan PPh 21(3%) Rp.120.737,-
1602   02-May-23   SINARMAS IDR     0002999994     )                                                          3,903,818    4,024,555         -         120,737         3,903,818
                                                   DITJEN POSTEL, BHP Frekuensi Radio Periode 28 Mei
                                                   2023 s.d 27 Mei 2024 - No. Aplikasi :
1603   04-May-23   MANDIRI IDR     1220011559559   02377237052021                                             7,569,868    7,569,868         -             -           7,569,868
                                                   DITJEN POSTEL, BHP Frekuensi Radio Periode 09 Mei
                                                   2023 s.d 08 Mei 2024 - No. Aplikasi :
1604   04-May-23   MANDIRI IDR     1220011559559   02004060052019                                             7,103,726    7,103,726         -             -           7,103,726
                                                   DITJEN POSTEL, BHP Frekuensi Radio Periode 09 Mei
                                                   2023 s.d 08 Mei 2024 - No. Aplikasi :
1605   04-May-23   MANDIRI IDR     1220011559559   02004059052019                                             7,103,726    7,103,726         -             -           7,103,726
                                                   DITJEN POSTEL, BHP Frekuensi Radio Periode 09 Mei
                                                   2023 s.d 08 Mei 2024 - No. Aplikasi :
1606   04-May-23   MANDIRI IDR     1220011559559   02004062052019                                             7,103,726    7,103,726         -             -           7,103,726
                                                   DITJEN POSTEL, BHP Frekuensi Radio Periode 28 Mei
                                                   2023 s.d 27 Mei 2024 - No. Aplikasi :
1607   04-May-23   MANDIRI IDR     1220011559559   02377236052021                                             7,077,295    7,077,295         -             -           7,077,295
                                                   DITJEN POSTEL, BHP Frekuensi Radio Periode 28 Mei
                                                   2023 s.d 27 Mei 2024 - No. Aplikasi :
1608   04-May-23   MANDIRI IDR     1220011559559   02377238052021                                             9,848,748    9,848,748         -             -           9,848,748
                                                   DITJEN POSTEL, BHP Frekuensi Radio Periode 09 Mei
                                                   2023 s.d 08 Mei 2024 - No. Aplikasi :
1609   04-May-23   MANDIRI IDR     1220011559559   02004061052019                                             7,103,726    7,103,726         -             -           7,103,726
                                                   CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                   Material JC, Battery, Cable Power, NFA dari WH
1610   04-May-23   MANDIRI IDR     1220011559559   Serpong ke Office Matraman                                  644,150      650,000       7,150         13,000           644,150
                                                   CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
1611   04-May-23   MANDIRI IDR     1220011559559   Material ONT dari WH Serpong ke WH Matraman                 495,500      500,000       5,500         10,000           495,500
                                                   CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                   Material Battery ZTE 100AH dari WH Serpong ke
1612   04-May-23   MANDIRI IDR     1220011559559   Office Semarang, Office Sidoarjo dan WH Bali              13,328,950   13,450,000    147,950        269,000        13,328,950
                                                   CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                   Material JC 96 Core dari WH Serpong ke Office
1613   04-May-23   MANDIRI IDR     1220011559559   Matraman                                                    495,500      500,000       5,500         10,000           495,500
Page 90
      TANGGAL
    PENGELUARAN                   NOMOR REKENING
       DI BANK  REKENING BANK       BANK YANG                                                              NILAI MUTASI                     NILAI YANG DIBAYARKAN
NO.  STATEMENT YANG DIGUNAKAN       DIGUNAKAN              NAMA VENDOR DAN KETERANGAN                         BANK            DPP           PPN             PPh       NET DIBAYARKAN
                                                   CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                   Material Rectifier dan Battery dari WH Serpong ke
1614   04-May-23   MANDIRI IDR     1220011559559   Office Matraman                                              495,500         500,000        5,500         10,000           495,500
                                                   CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                   Material Kabel ADSS 24 Core dari PT Furukawa ke PT
1615   04-May-23   MANDIRI IDR     1220011559559   Quadra Indonesia Utama                                       495,500         500,000        5,500         10,000           495,500

                                                   GRAHA ARJANI AULIA DEKORTAMA, PT, Pembelian
                                                   Beban O dan P Material Consumable Baterai Charger
1616   04-May-23   MANDIRI IDR     1220011559559   Energizer AA 2.300 mAh 2 Pcs Sebanyak 8 Pak                 1,021,200        920,000      101,200            -           1,021,200
                                                   INFRASTRUKTUR BISNIS SEJAHTERA, PT, Jasa Penguat
                                                   Sinyal untuk Tenant di Gedung MSIG Berdasarkan
1617   04-May-23   MANDIRI IDR     1220011559559   Profit Sharing Februari 2023                               83,055,750     74,825,000     8,230,750           -          83,055,750

                                                   INTI ALGORITMA PERDANA, PT, Tagihan
                                                   Management Fee atas Profit Sharing periode
1618   04-May-23   MANDIRI IDR     1220011559559   Oktober - Desember 2022 di Gedung South Quarter            91,211,506     83,680,280     9,204,831     1,673,605        91,211,506
                                                   JAKARTA INTERNATIONAL EXPO, PT, Revenue Sharing
                                                   Internet Bali Towerindo periode Oktober - Desember
1619   04-May-23   MANDIRI IDR     1220011559559   2022 di JIEXPO                                            117,895,321    116,728,041    12,840,084    11,672,804       117,895,321
                                                   JELAJAH DATA SEMESTA, PT, Dedicated Internet
1620   04-May-23   MANDIRI IDR     1220011559559   Bandwidth 20Gbps periode Mei 2023                         300,000,000    275,229,358    30,275,229     5,504,587       300,000,000
                                                   MULIA INTIPELANGI, PT, Biaya Sewa Penempatan
                                                   Perangkat Telekomunikasi di Mall Taman Anggrek
                                                   Berdasarkan Profit Sharing periode Oktober -
1621   04-May-23   MANDIRI IDR     1220011559559   Desember 2022                                              12,298,598     12,176,830     1,339,451     1,217,683        12,298,598
                                                   ANGKASA PURA SUPPORT, PT, Pembayaran Tagihan
                                                   Listrik Angkasa pura untuk site M_335 area Kargo,
                                                   M_334 AP Bali -Kantor Imigrasi, M_331 AP Bali -Hotel
                                                   Haris, M_332 AP Bali-Area Parkir, dan M_333 AP Bali -
1622   05-May-23   MANDIRI IDR     1220011559559   Departure Area periode Februari 2023                       11,519,837     10,568,658     1,162,552       211,373        11,519,837
                                                   IRWAN PRADNYA DESIGN, Ud, Biaya pengadaan roll
                                                   up banner Marcom (PO Ro.1.550.000,- Potongan PPh
1623   08-May-23   SINARMAS IDR     0002999994     21(2.5%) Rp.38.750,- )                                      1,511,250      1,550,000           -          38,750         1,511,250
                                                   PLN PERSERO, PT, Pembelian Token PLN pada 7 Site
1624   08-May-23   SINARMAS IDR     0002999994     KWH Prabayar Pemakaian Bulan Mei 2023.                      7,830,000      7,830,000           -             -           7,830,000
                                                   ANGKUT TEKNOLOGI INDONESIA, PT, Biaya
                                                   Pengiriman Barang Melalui Aplikasi Deliveree
1625   09-May-23   MANDIRI IDR     1220011559559   periode Mar 2023                                             305,647         280,410       30,845          5,608           305,647
                                                   ANGKUT TEKNOLOGI INDONESIA, PT, Driver
                                                   Reimbursement Pengiriman Barang Melalui Aplikasi
1626   09-May-23   MANDIRI IDR     1220011559559   Deliveree periode Mar 2023                                  1,333,590      1,333,590           -             -           1,333,590

                                                   AP FIELD OPERATION & OPTIMIZING, Uang Muka
                                                   Beban Umum atas Kompensasi Listrik Warga Project
                                                   Jakwifi Batch 2 ( 1690 Pole - 1745 Penerima
1627   09-May-23   MANDIRI IDR     1220011559559   Kompensasi ) Periode 20 Mei - 20 Agustus 2023 - Trf       824,250,000    824,250,000           -             -         824,250,000

                                                   AP FIELD OPERATION & OPTIMIZING, Uang Muka
                                                   Beban Umum atas Kompensasi Listrik Warga Project
                                                   Jakwifi Batch 2 ( 1690 Pole - 1745 Penerima
1628   09-May-23   MANDIRI IDR     1220011559559   Kompensasi ) Periode 20 Mei - 20 Agustus 2023 - Trf        63,750,000     63,750,000           -             -          63,750,000

                                                   MDT TOTAL SOLUTION, PT, Pembelian Patchcord SM
1629   09-May-23   MANDIRI IDR     1220011559559   Duplex LC/UPC-LC/UPC 3MM 15 M Sebanyak 5 Unit                294,150         265,000       29,150            -             294,150
                                                   FPU PENJAGA SITE, Pembayaran penjaga site dan
                                                   uang canang bulan April 2023 (Transfer Bank
1630   10-May-23   MANDIRI IDR     1220011559559   Sinarmas di 65 Site BTS )                                  38,200,000     38,200,000           -             -          38,200,000
                                                   CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                   Material Kabel dari PT Furukawa ke PT Morasha Inti
1631   10-May-23   MANDIRI IDR     1220011559559   Shabrina                                                     495,500         500,000        5,500         10,000           495,500
                                                   DIAN MUSTIKA AGUNG, PT, Pembelian Kabel Ties
1632   10-May-23   MANDIRI IDR     1220011559559   Nylon 4.8 x 300 MM Hitam Sebanyak 30 Pcs                    1,332,000      1,200,000      132,000            -           1,332,000
                                                   GRIYA MURIA KENCANA, PT, Tagihan Revenue
                                                   Sharing periode Maret 2023 atas Penempatan
1633   10-May-23   MANDIRI IDR     1220011559559   Perangkat Telekomunikasi di Gedung Prince Center             737,300         730,000       80,300         73,000           737,300

                                                   INFRASTRUKTUR BISNIS SEJAHTERA, PT, Jasa Penguat
                                                   Sinyal untuk Tenant di Gedung The Plaza Office
1634   10-May-23   MANDIRI IDR     1220011559559   Tower Berdasarkan Profit Sharing Februari 2023             44,400,000     40,000,000     4,400,000           -          44,400,000
                                                   INFRASTRUKTUR BISNIS SEJAHTERA, PT, Jasa Penguat
                                                   Sinyal untuk Tenant di Gedung Thamrin Nine
1635   10-May-23   MANDIRI IDR     1220011559559   Berdasarkan Profit Sharing Februari 2023                    7,456,276      6,717,366      738,910            -           7,456,276
                                                   MULIA CEMERLANG DIAN PERSADA, PT, Sewa
                                                   Penempatan Perangkat di Gedung Wisma GKBI
1636   10-May-23   MANDIRI IDR     1220011559559   periode 01 Mar 2023 - 29 Feb 2024                         127,260,000    126,000,000    13,860,000    12,600,000       127,260,000
                                                   NICO CENTRAL, PT, Sewa Penempatan Perangkat di
                                                   Gedung Sona Topas periode 01 Mei 2023 - 30 Apr
1637   10-May-23   MANDIRI IDR     1220011559559   2024                                                       67,670,000     67,000,000     7,370,000     6,700,000        67,670,000
                                                   PAKARTI JAYA, PT, Biaya Penempatan Sewa
                                                   Perangkat Telekomunikasi berdasarkan Revenue
                                                   Sharing periode Januari - Maret 2023 di Gedung
1638   10-May-23   MANDIRI IDR     1220011559559   Pakarti Center                                               915,600         840,000       92,400         16,800           915,600
                                                   PLN PERSERO, PT, Biaya Tagihan Listrik PLN
1639   11-May-23   MANDIRI IDR      0000240408     Pascabayar BTS Region Bali Periode Mei 2023             1,205,140,534   1,205,140,534          -             -        1,205,140,534
                                                   AP FIELD OPERATION & OPTIMIZING, Uang Muka
                                                   Beban Umum atas Biaya Kompensasi Listrik Warga
                                                   Jakwifi Batch 1 ( 809 Pole-812 Penerima Kompensasi
1640   11-May-23   MANDIRI IDR     1220011559559   ) Periode 20 Mei-20 Agustus 2023 - Trf                    412,650,000    412,650,000           -             -         412,650,000
                                                   AP FIELD OPERATION & OPTIMIZING, Uang Muka
                                                   Beban Umum atas Biaya Kompensasi Listrik Warga
                                                   Jakwifi Batch 1 ( 809 Pole-812 Penerima Kompensasi
1641   11-May-23   MANDIRI IDR     1220011559559   ) Periode 20 Mei-20 Agustus 2023 - Trf                     31,500,000     31,500,000           -             -          31,500,000
Page 91
      TANGGAL
    PENGELUARAN                   NOMOR REKENING
       DI BANK  REKENING BANK       BANK YANG                                                              NILAI MUTASI                    NILAI YANG DIBAYARKAN
NO.  STATEMENT YANG DIGUNAKAN       DIGUNAKAN                 NAMA VENDOR DAN KETERANGAN                      BANK            DPP          PPN             PPh       NET DIBAYARKAN
                                                   ASOSIASI PENYELENGGARA JASA INTERNET
                                                   INDONESIA, Uang Muka Beban Umum atas Biaya
                                                   Perpanjangan Biaya Sewa IP Public (IP ADD/22 per
1642   11-May-23   MANDIRI IDR     1220011559559   Juni 2023 - Mei 2024) APJII - PR : 1010033282 - Trf         9,265,000      9,265,000          -             -           9,265,000
                                                   DINAS PERUMAHAN, PERMUKIMAN, CIPTA KARYA
                                                   DAN TATA RUANG KABUPATEN SIDOARJO, Uang
                                                   Muka Beban Umum atas Biaya Retribusi
                                                   Pengendalian Menara Telekomunikasi Wilayah
                                                   Kabupaten Sidoarjo Tahun 2022 site Gedangan-003 -
1643   11-May-23   MANDIRI IDR     1220011559559   PR : 1010033256 - Trf                                       1,366,000      1,366,000          -             -           1,366,000
                                                   PERHIMPUNAN PENGHUNI MENARA KADIN
                                                   INDONESIA, Uang Muka Beban Umum atas
                                                   Pengajuan Biaya Perbaikan Firestop Tenant PT
                                                   ABHINAWA SUMBERDAYA ASIA Gedung Menara
1644   11-May-23   MANDIRI IDR     1220011559559   Kadin - Trf                                                 2,700,000      2,700,000          -             -           2,700,000
                                                   PLN PERSERO, PT, Biaya Tagihan KWH PLN Pasca
1645   11-May-23   MANDIRI IDR     1220011559559   Bayar Region Jabodetabek Periode Mei 2023               2,273,051,042   2,273,051,042         -             -        2,273,051,042
                                                   BALI PECATU GRAHA, PT, Biaya pembayaran tagihan
                                                   listrik IPL dan BPG bulan Mei 2023 (Pemakaian bulan
1646   12-May-23   SINARMAS IDR     0002999994     April 2023)                                                12,704,584     12,704,584          -             -          12,704,584
                                                   FPU PENJAGA SITE, Pembayaran penjaga site dan
                                                   uang canang bulan April 2023 ( Non Transfer Bank
1647   12-May-23   SINARMAS IDR     0002999994     Sinarmas di 3 Site BTS )                                    2,400,000      2,400,000          -             -           2,400,000

                                                   AP FIELD OPERATION & OPTIMIZING, Uang Muka
                                                   Beban Umum atas Biaya Kompensasi Listrik Warga
                                                   Project Jakwifi Batch 3 ( 225 Pole-225 Penerima
1648   12-May-23   MANDIRI IDR     1220011559559   Kompensasi ) Periode 20 Mei - 20 Agustus 2023 - Trf        10,500,000     10,500,000          -             -          10,500,000

                                                   AP FIELD OPERATION & OPTIMIZING, Uang Muka
                                                   Beban Umum atas Biaya Kompensasi Listrik Warga
                                                   Project Jakwifi Batch 3 ( 225 Pole-225 Penerima
1649   12-May-23   MANDIRI IDR     1220011559559   Kompensasi ) Periode 20 Mei - 20 Agustus 2023 - Trf       128,850,000    128,850,000          -             -         128,850,000
                                                   ASOSIASI PENYELENGGARA JASA INTERNET
                                                   INDONESIA, Biaya Penempatan Rak (S2) di APJII
1650   12-May-23   MANDIRI IDR     1220011559559   Periode Mei 2023                                           10,900,000     10,000,000    1,100,000       200,000        10,900,000
                                                   AWAN KILAT SEMESTA, PT, Tagihan Revenue Sharing
                                                   periode Maret 2023 atas penjualan produk BaliCloud
1651   12-May-23   MANDIRI IDR     1220011559559   Tenant PT Adia Pradipta Lestari                            30,605,400     31,230,000          -         624,600        30,605,400
                                                   AWAN KILAT SEMESTA, PT, Tagihan Revenue Sharing
                                                   periode Januari 2023 atas penjualan produk
1652   12-May-23   MANDIRI IDR     1220011559559   BaliCloud Tenant PT Adia Pradipta Lestari                  30,605,400     31,230,000          -         624,600        30,605,400
                                                   AWAN KILAT SEMESTA, PT, Tagihan Revenue Sharing
                                                   periode Februari 2023 atas penjualan produk
1653   12-May-23   MANDIRI IDR     1220011559559   BaliCloud Tenant PT Adia Pradipta Lestari                  30,605,400     31,230,000          -         624,600        30,605,400
                                                   CYBER NETWORK INDONESIA, PT, Biaya Sewa
1654   12-May-23   MANDIRI IDR     1220011559559   Collocation OTB Nix Bali periode Apr 2023                   2,997,500      2,750,000     302,500         55,000         2,997,500
                                                   CYBER NETWORK INDONESIA, PT, Sewa Colocation
1655   12-May-23   MANDIRI IDR     1220011559559   Rack IU OTB (MMR) periode Apr 2023                          3,270,000      3,000,000     330,000         60,000         3,270,000
                                                   DATAMEDIA MAKMUR PRATAMA, PT, Biaya Layanan
                                                   Content TV 42 Channel untuk Tenant RS Atma Jaya
1656   12-May-23   MANDIRI IDR     1220011559559   Pluit periode Apr 2023                                     12,740,000     13,000,000          -         260,000        12,740,000
                                                   INDONESIA COMNETS PLUS, PT, Sewa Local Loop 5
                                                   Mbps Diskominfo Kab. Purwakarta Warudoyong -
                                                   Dinas Cipta Karya, Pertigaan Wanayasa, Pertigaan
                                                   Cianting, Situ Wanayasa, 15 Mbps site Nageri Kidul-
1657   12-May-23   MANDIRI IDR     1220011559559   004 periode Mar 2023                                       12,615,074     11,573,462    1,273,081       231,469        12,615,074
                                                   INFRA YES SOLUSINDO, PT, Biaya Management Fee
                                                   atas Revenue Sharing periode Maret 2023 di
1658   12-May-23   MANDIRI IDR     1220011559559   Apartement Green Pramuka                                   33,671,287     34,358,456          -         687,169        33,671,287
                                                   MEGA PLAZA, PT, Sewa Penempatan Perangkat di
                                                   Gedung Mega Plaza periode 01 Apr 2023 - 31 Mar
1659   12-May-23   MANDIRI IDR     1220011559559   2024                                                       20,462,500     20,260,000    2,227,500     2,025,000        20,462,500
                                                   PERHIMPUNAN PEMILIK DAN PENGHUNI SATUAN
                                                   RUMAH SUSUN KLENDER, Sewa Penempatan
                                                   Perangkat di Gedung Rumah Susun Klender periode
1660   12-May-23   MANDIRI IDR     1220011559559   30 Jan 2023 - 29 Jan 2024                                  24,750,000     27,500,000          -       2,750,000        24,750,000
                                                   GERAI LISTRIK PASAR MOBIL KEMAYORAN, Biaya
                                                   Tagihan Pascabayar untuk Site 70035 Gunung Sahari
                                                   Utara-008,700414 Gunung Sahari Utara-009 dan
                                                   701015 Danau Sunter DII-003 Periode Mei 2023
1661   15-May-23   MANDIRI IDR     1220011559559   (Pemakaian April 2023)                                      4,866,803      4,966,125          -          99,322         4,866,803
                                                   ANGKUT TEKNOLOGI INDONESIA, PT, Driver
                                                   Reimbursement Pengiriman Barang Melalui Aplikasi
1662   16-May-23   MANDIRI IDR     1220011559559   Deliveree periode Apr 2023                                  2,088,789      2,088,789          -             -           2,088,789
                                                   ARYAVENTURA REALTY, PT, Biaya atas Pemakaian
1663   16-May-23   MANDIRI IDR     1220011559559   Listrik di Gedung Aryaventura periode Mar 2023               208,680         206,614      22,727         20,661           208,680
                                                   ASSET PACIFIC, PT, Biaya atas Pemakaian Listrik di
1664   16-May-23   MANDIRI IDR     1220011559559   Gedung Menara Salemba periode Mar 2023                       121,338         120,136      13,215         12,013           121,338
                                                   BALI UTAMA CAKRAWALA, PT, Biaya atas Pemakaian
                                                   Listrik di Gedung Discovery Shopping Mall Periode 01
1665   16-May-23   MANDIRI IDR     1220011559559   Mar 2023 - 28 Mar 2023                                       165,113         163,479      17,981         16,347           165,113
                                                   BANGUNMUSTIKA INTIPERSADA, PT, Biaya atas
                                                   Pemakaian Listrik di ITC Cipulir Mas Lt 4/F.035 (IKR)
1666   16-May-23   MANDIRI IDR     1220011559559   Periode 18 Mar 2022 - 17 Apr 2023                           2,326,389      2,584,876          -         258,487         2,326,389
                                                   BUMI MULIA PERKASA DEVELOPMENT, PT, Biaya atas
                                                   Pemakaian Listrik di Gedung Atrium Mulia periode
1667   16-May-23   MANDIRI IDR     1220011559559   Apr 2023                                                     232,423         230,122      25,313         23,012           232,423
                                                   DATAMEDIA MAKMUR PRATAMA, PT, Biaya Layanan
                                                   Content TV 42 Channel untuk Tenant RS Atma Jaya
1668   16-May-23   MANDIRI IDR     1220011559559   Pluit periode Mei 2023                                     12,740,000     13,000,000          -         260,000        12,740,000

                                                   DITJEN POSTEL, BHP Frekuensi Radio Periode 03 Juni
1669   16-May-23   MANDIRI IDR     1220011559559   2023 s.d 02 Juni 2024 - No. Aplikasi : 2380499062021       17,690,733     17,690,733          -             -          17,690,733
Page 92
      TANGGAL
    PENGELUARAN                  NOMOR REKENING
       DI BANK  REKENING BANK      BANK YANG                                                            NILAI MUTASI                   NILAI YANG DIBAYARKAN
NO.  STATEMENT YANG DIGUNAKAN      DIGUNAKAN               NAMA VENDOR DAN KETERANGAN                      BANK          DPP           PPN             PPh       NET DIBAYARKAN
                                                  DONNELLY PARAMITA UTAMA, PT, Biaya atas
                                                  Pemakaian Listrik di Gedung Transavia Land/Graha
1670   16-May-23   MANDIRI IDR    1220011559559   Paramita periode Mar 2023                                  326,504       323,271       35,560         32,327           326,504
                                                  GRAHANIAGA TATAUTAMA, PT, Biaya atas
                                                  pemakaian Listrik di Gedung Graha Niaga Tatautama
1671   16-May-23   MANDIRI IDR    1220011559559   Periode 21/11/2022 - 20/12/2022                            232,658       230,354       25,339         23,035           232,658
                                                  INDOKARYA SUKSES BERSAMA, PT, Biaya atas
                                                  Pemakaian Listrik di Apartemen Pluit Sea View
1672   16-May-23   MANDIRI IDR    1220011559559   Periode 27 Mar 2023 - 17 Apr 2023                          736,556       818,395           -          81,839           736,556
                                                  INDOSAT TBK, PT, Biaya Sewa Domestic Ethernet Link
                                                  (MPLS) MSC Gatsu Denpasar Bali to KPPTI Lt. 6
1673   16-May-23   MANDIRI IDR    1220011559559   Jakarta periode Mar 2023                                114,460,000   105,010,000   11,550,000     2,100,000       114,460,000
                                                  INTERNETINDO DATA CENTRA INDONESIA, PT, Sewa
                                                  Crossconnect 3D 5 UTP dan 3D 3 FO periode Apr
1674   16-May-23   MANDIRI IDR    1220011559559   2023                                                      3,270,000     3,000,000     330,000         60,000         3,270,000
                                                  INTERNETINDO DATA CENTRA INDONESIA, PT,
                                                  Tagihan Kelebihan Pemakaian Listrik Rack No Winter
1675   16-May-23   MANDIRI IDR    1220011559559   233 Per 1 - 31 Mar 2023 (IDC Indonesia)                  10,682,000     9,800,000    1,078,000       196,000        10,682,000
                                                  INTERNETINDO DATA CENTRA INDONESIA, PT, Biaya
                                                  Sewa Penambahan Redundant Power Source Rack
1676   16-May-23   MANDIRI IDR    1220011559559   Winter 233 periode Apr 2023                               2,180,000     2,000,000     220,000         40,000         2,180,000
                                                  INTILAND DEVELOPMENT TBK, PT (JAKARTA), Biaya
                                                  atas Pemakaian Listrik di Gedung Intiland Jakarta
1677   16-May-23   MANDIRI IDR    1220011559559   periode 26 Feb 2023 - 25 Mar 2023                          548,006       608,895           -          60,889           548,006
                                                  INTILAND DEVELOPMENT TBK, PT (SURABAYA), Biaya
                                                  Admin atas Pemakaian Listrik di Gedung Intiland
1678   16-May-23   MANDIRI IDR    1220011559559   Surabaya periode Mar 2023                                    76,146       75,392        8,293          7,539            76,146
                                                  INTILAND DEVELOPMENT TBK, PT (SURABAYA), Biaya
                                                  atas Pemakaian Listrik di Gedung Intiland Surabaya
1679   16-May-23   MANDIRI IDR    1220011559559   periode Mar 2023                                           678,526       753,917           -          75,391           678,526
                                                  KRAKATAU SARANA PROPERTI, PT, Biaya atas
                                                  Pemakaian Listrik di Krakatau Steel Group periode
1680   16-May-23   MANDIRI IDR    1220011559559   Mar 2023                                                     43,439       43,008        4,731          4,300            43,439
                                                  MDT TOTAL SOLUTION, PT, Pembelian Joint Closure
                                                  24 Core untuk Kebutuhan Stock Ops 3 Bulan Area
                                                  Jatim Sebanyak 10 Pcs, Joint Closure 48 Core untuk
                                                  Kebutuhan Stock Ops 3 Bulan Area Jatim Sebanyak
1681   16-May-23   MANDIRI IDR    1220011559559   10 Pcs                                                    6,327,000     5,700,000     627,000            -           6,327,000
                                                  MEDIA NUSANTARA DATA GLOBAL, PT, Sewa Full
1682   16-May-23   MANDIRI IDR    1220011559559   Rack Server Cabinet 45U periode Mar 2023                 10,900,000    10,000,000    1,100,000       200,000        10,900,000
                                                  MEGA PLAZA, PT, Biaya atas Pemakaian Listrik di
1683   16-May-23   MANDIRI IDR    1220011559559   Gedung Mega Plaza periode Mar 2023                         159,780       158,198       17,401         15,819           159,780
                                                  MENARA THAMRIN, PT, Biaya atas Pemakaian Listrik
                                                  di Gedung Menara Thamrin Suite 21 & 6 periode
1684   16-May-23   MANDIRI IDR    1220011559559   Maret 2023                                                 243,489       241,078       26,518         24,107           243,489
                                                  MORA TELEMATIKA INDONESIA, PT, Biaya
                                                  Interkoneksi dari OTB BTS ke Rack BTS NDC
1685   16-May-23   MANDIRI IDR    1220011559559   Jatinegara periode 01.04.2023 - 30.04.2023                1,090,000     1,000,000     110,000         20,000         1,090,000
                                                  MORA TELEMATIKA INDONESIA, PT, Biaya
                                                  Interkoneksi dari OTB BTS ke Rack BTS NDC
1686   16-May-23   MANDIRI IDR    1220011559559   Jatinegara periode 01.03.2023 - 31.03.2023                1,090,000     1,000,000     110,000         20,000         1,090,000
                                                  MORA TELEMATIKA INDONESIA, PT, Biaya Sewa Dark
                                                  Core FO dari MTI Graha 9 ke NDC Jatinegara periode
1687   16-May-23   MANDIRI IDR    1220011559559   26.01.2023 - 25.02.2023                                   8,011,500     7,350,000     808,500        147,000         8,011,500
                                                  MORA TELEMATIKA INDONESIA, PT, Sewa
                                                  Colocation, Kabel Shaft, Colocation OTB 2U & Biaya
                                                  Interkoneksi antar Rak MMR periode 01.03.2023 -
1688   16-May-23   MANDIRI IDR    1220011559559   31.03.2023                                                9,265,000     8,500,000     935,000        170,000         9,265,000
                                                  MORA TELEMATIKA INDONESIA, PT, Sewa
                                                  Colocation, Kabel Shaft, Colocation OTB 2U & Biaya
                                                  Interkoneksi antar Rak MMR periode 01.04.2023 -
1689   16-May-23   MANDIRI IDR    1220011559559   30.04.2023                                                9,265,000     8,500,000     935,000        170,000         9,265,000

                                                  MULIA INTIPELANGI, PT, Biaya atas Pemakaian Listrik
1690   16-May-23   MANDIRI IDR    1220011559559   Mall Taman Anggrek (GL-L5) Periode Apr 2023               3,621,961     3,586,099     394,471        358,609         3,621,961
                                                  NTT INDONESIA, PT, Sewa Crossconnect Establish
                                                  NTT Ether 150 Mbps At Cargill Level 26 W 46 periode
1691   16-May-23   MANDIRI IDR    1220011559559   Apr 2023                                                 14,715,000    13,500,000    1,485,000       270,000        14,715,000
                                                  NUSA KIRANA REAL ESTATE, PT, Biaya Sewa
                                                  Penempatan Perangkat Telekomunikasi di Gedung
                                                  Kirana Boutique Berdasarkan Penggunaan Jaringan
1692   16-May-23   MANDIRI IDR    1220011559559   Internet periode April 2022 - Juni 2022                  11,481,811    11,368,129    1,250,494     1,136,812        11,481,811
                                                  P3SRS SEMENTARA MEGA GLODOK KEMAYORAN,
                                                  Biaya atas Pemakaian Listrik di MGK Kemayoran
1693   16-May-23   MANDIRI IDR    1220011559559   periode 20 Jan 2023 - 20 Feb 2023                          141,026       141,026           -             -             141,026
                                                  P3SRS SEMENTARA MEGA GLODOK KEMAYORAN,
                                                  Biaya atas Pemakaian Listrik di MGK Kemayoran
1694   16-May-23   MANDIRI IDR    1220011559559   periode 20 Feb 2023 - 20 Mar 2023                          132,028       132,028           -             -             132,028
                                                  P3SRS SEMENTARA MEGA GLODOK KEMAYORAN,
                                                  Biaya atas Pemakaian Listrik di MGK Kemayoran
1695   16-May-23   MANDIRI IDR    1220011559559   periode 20 Dec 2022 - 20 Jan 2023                          142,713       142,713           -             -             142,713
                                                  PERHIMPUNAN PEMILIK DAN PENGHUNI SATUAN
                                                  RUMAH RUSUN SPAZIO, Biaya atas Pemakaian Listrik
                                                  & Admin di Rusun Spazio periode 21 Feb 2023 - 20
1696   16-May-23   MANDIRI IDR    1220011559559   Mar 2023                                                   146,603       146,870           -            267            146,603
                                                  PERHIMPUNAN PENGHUNI MENARA KADIN
                                                  INDONESIA, Biaya atas Pemakaian Listrik di Gedung
1697   16-May-23   MANDIRI IDR    1220011559559   Menara Kadin periode Mar 2023                              350,541       389,489           -          38,948           350,541
                                                  PETARUNG TANGGUH PERSADA, PT, Biaya atas
                                                  Pemakaian Listrik di Mal Bali Galeria periode Mar
1698   16-May-23   MANDIRI IDR    1220011559559   2023                                                       544,933       539,537       59,349         53,953           544,933
                                                  JELAJAH DATA SEMESTA, PT, Dedicated Internet
1699   19-May-23   MANDIRI IDR    1220011559559   Bandwidth 20Gbps periode Mei 2023                       681,000,000   624,770,642   68,724,771    12,495,413       681,000,000
Page 93
      TANGGAL
    PENGELUARAN                  NOMOR REKENING
       DI BANK  REKENING BANK      BANK YANG                                                               NILAI MUTASI                 NILAI YANG DIBAYARKAN
NO.  STATEMENT YANG DIGUNAKAN      DIGUNAKAN              NAMA VENDOR DAN KETERANGAN                          BANK         DPP          PPN             PPh       NET DIBAYARKAN

                                                  MULIA CEMERLANG DIAN PERSADA, PT, Biaya atas
1700   19-May-23   MANDIRI IDR    1220011559559   Pemakaian Listrik di Wisma GKBI periode April 2023            493,071      488,188      53,701         48,818           493,071
                                                  PERHIMPUNAN PEMILIK DAN PENGHUNI SATUAN
                                                  RUMAH SUSUN HUNIAN DAN NON HUNIAN MAL &
                                                  KONDOMINIUM TAMAN ANGGREK, Biaya Denda
                                                  Keterlambatan Tagihan Profit Sharing di PP Mal &
                                                  Kondominium Taman Anggrek Periode April 2023
1701   22-May-23   MANDIRI IDR    1220011559559   (No Invoice : 2023040037)                                       40,630      40,630          -             -              40,630
                                                  AMAZANA KENCANA, PT, Biaya atas Pemakaian
1702   24-May-23   MANDIRI IDR    1220011559559   Listrik Apartemen Amazana Periode Apr 2023                    379,343      348,021      38,282          6,960           379,343
                                                  ARYAVENTURA REALTY, PT, Biaya atas Pemakaian
1703   24-May-23   MANDIRI IDR    1220011559559   Listrik di Gedung Aryaventura periode Apr 2023                193,564      191,647      21,081         19,164           193,564
                                                  BANGUNMUSTIKA INTIPERSADA, PT, Biaya atas
                                                  Pemakaian Listrik di ITC Cipulir Mas Lt. Dasar - LT. 4
1704   24-May-23   MANDIRI IDR    1220011559559   periode 18 Mar 2023 - 17 Apr 2023                            1,326,060    1,473,399         -         147,339         1,326,060
                                                  BANGUNMUSTIKA INTIPERSADA, PT, Biaya atas
                                                  Pemakaian Listrik dan Air di ITC CIpulir Mas Lt.
                                                  4/B.071 (Call Center) Periode 18 Mar 2022 - 17 Apr
1705   24-May-23   MANDIRI IDR    1220011559559   2023                                                        11,960,450   13,289,388         -       1,328,938        11,960,450
                                                  DIAN MUSTIKA AGUNG, PT, Pembelian Dyna Bolt D
                                                  8MM P 40MM Sebanyak 135 Pcs, Mur Baut D 10MM
1706   24-May-23   MANDIRI IDR    1220011559559   P 100MM Sebanyak 70 Pcs, dll                                 6,030,907    5,433,250    597,657            -           6,030,907
                                                  FIBER NETWORKS INDONESIA, PT, Sewa Local Loop
                                                  30 Mbps - Pergudangan Puninar Yusen Periode Apr
1707   24-May-23   MANDIRI IDR    1220011559559   2023                                                         4,360,000    4,000,000    440,000         80,000         4,360,000
                                                  GRAHA IRAMA, PT, Biaya atas Pemakaian Listrik di
                                                  Gedung Graha Irama periode 01 Apr 2022 - 01 Mei
1708   24-May-23   MANDIRI IDR    1220011559559   2023                                                          130,185      144,649          -          14,464           130,185
                                                  GRIYA MURIA KENCANA, PT, Biaya atas Pemakaian
                                                  Listrik di Gedung Prince Center periode 25 Mar 2023 -
1709   24-May-23   MANDIRI IDR    1220011559559   25 Apr 2023                                                   244,514      242,093      26,630         24,209           244,514

                                                  INTILAND DEVELOPMENT TBK, PT (SURABAYA), Sewa
                                                  Penempatan Perangkat Telekomunikasi Server MMR
1710   24-May-23   MANDIRI IDR    1220011559559   B1 di Gedung Intiland periode Apr 2023                       4,040,000    4,000,000    440,000        400,000         4,040,000
                                                  ISMAWA TRIMITRA, PT, Biaya atas Pemakaian Listrik
                                                  di Graha Iskandarsyah periode 20 Mar 2023 - 27 Apr
1711   24-May-23   MANDIRI IDR    1220011559559   2023                                                          171,336      169,639      18,660         16,963           171,336
                                                  JALA LINTAS MEDIA, PT, Crossconnect Jala Lintas
                                                  Media Local Loop Cyber APJII to BSD Taman Tekno
1712   24-May-23   MANDIRI IDR    1220011559559   25 Mbps periode Mar 2023                                     7,085,000    6,500,000    715,000        130,000         7,085,000
                                                  MEDIA NUSANTARA DATA GLOBAL, PT, Sewa
                                                  Crossconnect Fiber Optic in Data Center CDCI - 1 Port
1713   24-May-23   MANDIRI IDR    1220011559559   REQ/21FEB19/00000008 periode Mar 2023                        1,635,000    1,500,000    165,000         30,000         1,635,000
                                                  MEDIA NUSANTARA DATA GLOBAL, PT, Biaya Sewa
1714   24-May-23   MANDIRI IDR    1220011559559   Penempatan OTB Fiber in NER periode Mar 2023                 2,180,000    2,000,000    220,000         40,000         2,180,000
                                                  MUSTIKA RATU CENTRE, PT, Biaya atas Pemakaian
                                                  Listrik di Gedung Mustika Ratu Centre periode Apr
1715   24-May-23   MANDIRI IDR    1220011559559   2023                                                          201,434      199,439      21,938         19,943           201,434
                                                  NICO CENTRAL, PT, Biaya atas Pemakaian Listrik di
1716   24-May-23   MANDIRI IDR    1220011559559   Gedung Sona Topas Tower Periode Apr 2023                      247,248      244,800      26,928         24,480           247,248
                                                  OMADATA PADMA INDONESIA, PT, Biaya Sewa
                                                  Management Cable - MMR 1U OTB Periode Apr 2023
1717   24-May-23   MANDIRI IDR    1220011559559   (Omadata)                                                    1,635,000    1,500,000    165,000         30,000         1,635,000
                                                  PENGELOLA LANDMARK PLUIT, PT, Biaya atas
                                                  Pemakaian Listrik Landmark Pluit (GF-A) periode 16
1718   24-May-23   MANDIRI IDR    1220011559559   Maret 2023 - 15 April 2023                                    153,430      151,911      16,710         15,191           153,430
                                                  PENGELOLA LANDMARK PLUIT, PT, Biaya atas
                                                  Pemakaian Listrik Landmark Pluit (GF-E) periode 16
1719   24-May-23   MANDIRI IDR    1220011559559   Maret 2023 - 15 April 2023                                    154,803      153,270      16,860         15,327           154,803
                                                  PENGELOLA LANDMARK PLUIT, PT, Biaya atas
                                                  Pemakaian Listrik Landmark Pluit (GF-D) periode 16
1720   24-May-23   MANDIRI IDR    1220011559559   Maret 2023 - 15 April 2023                                    122,291      121,080      13,319         12,108           122,291
                                                  PENGELOLA LANDMARK PLUIT, PT, Biaya atas
                                                  Pemakaian Listrik Landmark Pluit (GF-B) periode 16
1721   24-May-23   MANDIRI IDR    1220011559559   Maret 2023 - 15 April 2023                                    135,266      133,926      14,732         13,392           135,266

                                                  PERHIMPUNAN PENGHUNI GEDUNG PERKANTORAN
                                                  KIRANA TWO, Biaya atas Pemakaian Listrik di Gedung
1722   24-May-23   MANDIRI IDR    1220011559559   Kirana Two periode 21 Mar 2023 - 20 Apr 2023                  672,945      747,716          -          74,771           672,945
                                                  PERHIMPUNAN PENGHUNI WISMA STACO, Biaya
                                                  atas Pemakaian Listrik di Wisma Staco periode Apr
1723   24-May-23   MANDIRI IDR    1220011559559   2023                                                          127,670      141,855          -          14,185           127,670
                                                  DITJEN POSTEL, BHP Frekuensi Radio Periode 28 Mei
                                                  2023 s.d 27 Mei 2024 - No. Aplikasi :
1724   25-May-23   MANDIRI IDR    1220011559559   02377187052021                                              17,690,733   17,690,733         -             -          17,690,733
                                                  INDOSAT TBK, PT, Sewa Domestik Link Platinum
                                                  Wisma Barito To IDC/ Cyber APJII 10 Mbps periode
1725   25-May-23   MANDIRI IDR    1220011559559   Apr 2023                                                     4,370,000    4,010,000    440,000         80,000         4,370,000

                                                  MEGA AKSES PERSADA, PT, Sewa Layanan Jabalink
                                                  1Gbps P2P dari IDC Duren Tiga ke Jabalink Bali Tower
1726   25-May-23   MANDIRI IDR    1220011559559   Surabaya Omadata Center periode Apr 2023                    25,070,000   23,000,000   2,530,000       460,000        25,070,000
                                                  MEGA AKSES PERSADA, PT, Sewa Layanan Jabalink
                                                  500Mbps (Fiberstar) Intercity Jakarta - Diskominfo
1727   25-May-23   MANDIRI IDR    1220011559559   Cirebon periode Apr 2023                                     8,720,000    8,000,000    880,000        160,000         8,720,000
                                                  MEGA AKSES PERSADA, PT, Sewa Layanan Jabalink
                                                  500Mbps (Fiberstar) Jakarta - Bandung periode Apr
1728   25-May-23   MANDIRI IDR    1220011559559   2023                                                         9,265,000    8,500,000    935,000        170,000         9,265,000
                                                  MENARA CAPITAL INDONUSA, PT, Biaya atas
                                                  Pemakaian Listrik Gedung Palma Tower lt. 11
1729   25-May-23   MANDIRI IDR    1220011559559   periode Apr 2023                                              103,048      102,027      11,223         10,202           103,048
Page 94
      TANGGAL
    PENGELUARAN                       NOMOR REKENING
       DI BANK  REKENING BANK           BANK YANG                                                              NILAI MUTASI                  NILAI YANG DIBAYARKAN
NO.  STATEMENT YANG DIGUNAKAN           DIGUNAKAN                NAMA VENDOR DAN KETERANGAN                       BANK          DPP          PPN             PPh       NET DIBAYARKAN
                                                        MENARA CAPITAL INDONUSA, PT, Biaya atas
                                                        Pemakaian Listrik Gedung Palma Tower lt. B.1
1730   25-May-23     MANDIRI IDR       1220011559559    periode Apr 2023                                            103,048       102,027      11,223         10,202           103,048
                                                        PERHIMPUNAN PENGHUNI KONDOMINIUM
                                                        PERKANTORAN GRAHA SURVEYOR INDONESIA, Biaya
                                                        atas Pemakaian Listrik di Gedung Surveyor Lt.P2
1731   25-May-23     MANDIRI IDR       1220011559559    periode 22 Mar 2023 - 22 Apr 2023                           343,689       381,876          -          38,187           343,689
                                                        PERHIMPUNAN PENGHUNI KONDOMINIUM
                                                        PERKANTORAN GRAHA SURVEYOR INDONESIA, Biaya
                                                        atas Pemakaian Listrik di Gedung Surveyor Lt. 11
1732   25-May-23     MANDIRI IDR       1220011559559    periode 22 Mar 2023 - 22 Apr 2023                           316,013       351,125          -          35,112           316,013
                                                        BIBIT, Mr, Perbaikan FO Cut TT.I0407-001 & I0407-
                                                        003 site 06 to site 34 dan akses M99 Jln Bypass
                                                        Ngurah Rai (PO Rp.2.982.160,-Potongan PPh 21(3%)
1733   25-May-23     SINARMAS IDR        0002999994     Rp.89.465,-)                                               2,892,695     2,982,160         -          89,465         2,892,695
                                                        BIBIT, Mr, Biaya Perbaikan FO Cut TT.I0412-007 link
                                                        site_16 GWK to site_07 Kampial Jl Balicliff, Ungasan
                                                        (PO Rp.1.371.000,- Potongan PPh 21(3%) Rp.41.130,-
1734   25-May-23     SINARMAS IDR        0002999994     )                                                          1,329,870     1,371,000         -          41,130         1,329,870
                                                        PENGEMBANGAN PARIWISATA INDONESIA, PT,
                                                        Penggantian Biaya Listrik Bulan Desember 2022 site
1735   26-May-23     MANDIRI IDR       1220011559559    BTDC                                                       9,299,486     9,299,486         -             -           9,299,486
                                                        BINAJASA SUMBER SARANA, PT, Reimbursement
                                                        Insentif Outsource Div. Direct Sales periode Mar
                                                        2023 dan Insentif Bonus Ketupat periode Jun 2022 -
1736   26-May-23     MANDIRI IDR       1220011559559    Mar 2023                                                  62,664,962    62,249,962    507,222         92,222        62,664,962

                                                        BINAJASA SUMBER SARANA, PT, Reimbursement
1737   26-May-23     MANDIRI IDR       1220011559559    Salary Outsource Div. Direct Sales periode Apr 2023       68,810,913    68,355,211    556,968        101,266        68,810,913
                                                        CHINA MOBILE INTERNATIONAL LTD, IP Transit
1738   26-May-23    SINARMAS USD       1220011559559    Equinix SG 20Mbps Periode Apr 2023                         6,991,252     6,991,252         -             -           6,991,252
                                                        CHINA MOBILE INTERNATIONAL LTD, IP Transit
1739   26-May-23    SINARMAS USD       1220011559559    Equinix SG 50Mbps Periode Apr 2023                         9,698,503     9,698,503         -             -           9,698,503
                                                        EQUINIX SINGAPORE PTE LTD, Biaya Sewa Rack
                                                        Colocation dan Interkoneksi Equinix Singapore
1740   26-May-23SINARMAS IDR 0000240408 1220011559559   periode Apr 2023                                         106,599,660   106,599,660         -             -         106,599,660
                                                        MULTI USAHA SEJAHTERA BERSAMA, PT,
                                                        Reimbursement Salary Outsource All Dept periode
1741   26-May-23     MANDIRI IDR       1220011559559    Apr 2023 dan Insentif All Dept periode Mar 2023          915,418,356   909,364,819   7,398,767     1,345,230       915,418,356

                                                        MULTI USAHA SEJAHTERA BERSAMA, PT,
                                                        Reimbursement Salary Outsource Div. Direct Sales
                                                        periode Apr 2023, Insentif periode Mar 2023 dan
1742   26-May-23     MANDIRI IDR       1220011559559    Insentif Bonus Ketupat periode Jun 2022 - Mar 2023       205,582,850   204,221,374   1,664,026       302,550       205,582,850
                                                        PERMATA INDO SEJAHTERA, PT, Reimbursement
                                                        Salary Outsource Div. Direct Sales periode Apr 2023,
                                                        Insentif periode Mar 2023 dan Insentif Bonus
1743   26-May-23     MANDIRI IDR       1220011559559    Ketupat periode Jun 2022 - Mar 2023                      133,423,558   132,539,958   1,079,955       196,355       133,423,558
                                                        AMAZANA KENCANA, PT, Tagihan Revenue Sharing
                                                        Bali Fiber di Apartement Amazana Periode Januari -
1744   29-May-23     MANDIRI IDR       1220011559559    Maret 2023                                                 4,600,357     4,220,511    464,256         84,410         4,600,357
                                                        AP-CCTV FIELD OPERATION, Uang Muka Beban
                                                        Umum atas kompensasi listrik warga project jakwifi
                                                        batch 2 (2 penerima kompensasi) periode 20 Mei-20
1745   29-May-23     MANDIRI IDR       1220011559559    Agustus 2023 - Trf                                          900,000       900,000          -             -             900,000
                                                        API METRA GRAHA, PT, Tagihan Revenue Sharing
                                                        Minimum di Gedung Energy periode Januari - Maret
1746   29-May-23     MANDIRI IDR       1220011559559    2023 (PKS Lampiran 1)                                     21,210,000    21,000,000   2,310,000     2,100,000        21,210,000
                                                        BALI UTAMA CAKRAWALA, PT, Biaya Penempatan
                                                        Sewa Perangkat Telekomunikasi di Discovery
                                                        Shopping Mall berdasarkan Revenue Sharing periode
1747   29-May-23     MANDIRI IDR       1220011559559    Januari - Maret 2023                                      13,371,255    13,238,866   1,456,275     1,323,886        13,371,255
                                                        BENTENG ANUGERAH ASIH, PT, Biaya Pengiriman
                                                        Material Cable ADSS 48 Core dari PT Prysmian Cable
1748   29-May-23     MANDIRI IDR       1220011559559    ke PT Kaliabang Jaya Pratama                               1,189,200     1,200,000     13,200         24,000         1,189,200
                                                        BENTENG ANUGERAH ASIH, PT, Biaya Pengiriman
                                                        Material Pole FO Round 7 Black Painting dari PT Bayu
1749   29-May-23     MANDIRI IDR       1220011559559    Manunggal Sejahtera ke WH Serpong                          7,680,250     7,750,000     85,250        155,000         7,680,250
                                                        BIROTIKA SEMESTA, PT, Biaya Pengiriman Material
1750   29-May-23     MANDIRI IDR       1220011559559    dari Shenzen China ke Jakarta                             14,296,403    14,426,239    158,688        288,524        14,296,403
                                                        CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                        Material Battery 48V 100AH ZTE dari WH Serpong ke
1751   29-May-23     MANDIRI IDR       1220011559559    Office Matraman                                             644,150       650,000       7,150         13,000           644,150
                                                        CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                        Material Kabel ADSS 24 Core dari WH Serpong ke PT
1752   29-May-23     MANDIRI IDR       1220011559559    Kaliabang Jaya Pratama                                      495,500       500,000       5,500         10,000           495,500
                                                        CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                        Material Battery 48V 100AH ZTE dari WH Serpong ke
1753   29-May-23     MANDIRI IDR       1220011559559    Office Matraman                                             644,150       650,000       7,150         13,000           644,150
                                                        CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                        Material Kabel dari WH Serpong ke PT Simetrik
1754   29-May-23     MANDIRI IDR       1220011559559    Integrasi                                                   495,500       500,000       5,500         10,000           495,500
                                                        CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                        Material Cable ADSS 48 Core dari PT Prysmian Cable
1755   29-May-23     MANDIRI IDR       1220011559559    ke Office Matraman                                          594,600       600,000       6,600         12,000           594,600
                                                        CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
1756   29-May-23     MANDIRI IDR       1220011559559    Material Kabel dari PT CCSI ke PT Giga Datacom              743,250       750,000       8,250         15,000           743,250
                                                        CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                        Material Kabel ADSS 32 Core dari PT CCSI ke PT
1757   29-May-23     MANDIRI IDR       1220011559559    Mahaga Pratama                                              743,250       750,000       8,250         15,000           743,250
                                                        CITRA NIAGA LOGISTIK, PT, Biaya Pengiriman
                                                        Material Battery 48V 100AH ZTE dari WH Serpong ke
1758   29-May-23     MANDIRI IDR       1220011559559    Office Bandung                                             1,139,650     1,150,000     12,650         23,000         1,139,650
Page 95

          

File

File Open PDF
Source IDX
Size2.61 MB
Published14 Jul 2023
Pages95
Characters992,638
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 0 people and organisations named in the text · linked when the evidence is strong

The name pass has not read this document yet.

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result