Skip to content
Back to announcement

20230705_MDKA_Laporan Bulanan Aktivitas Eksplorasi_31337323_lamp2.pdf

Other Text extracted MDKA

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 10

Page 1
 PT Merdeka Copper Gold Tbk
 Treasury Tower Lantai 67 – 68, District 8 SCBD Lot 28
 Jl. Jend Sudirman Kav 52-53, Senayan, Kebayoran Baru
 Jakarta Selatan 12190, DKI Jakarta, Indonesia
 Phone: +62 21 3952 5580
 Fax: +62 21 3952 5589
 www.merdekacoppergold.com



Exploration Report – Quarter 2 2023

Summary: PT Merdeka Copper Gold Tbk (Merdeka) continues exploration activities at 3 locations in
Indonesia (Tujuh Bukit in East Java, Wetar Island in Southwest Maluku and Pani in Gorontalo), as shown
in Figure 1 below. In Tujuh Bukit the focus is on a copper-gold resource and gold-silver resources, in Wetar
the focus is on copper resources and in Pani the company is exploring a gold resource.

The total spending on exploration in Indonesia by Merdeka in Quarter 2 2023 is approximately Rp341.4
billion.




                                      Figure 1: Merdeka Exploration Project Locations



Copper and Gold: Tujuh Bukit Project

A. Expenditure:
   The total expenditure for exploration-related activities for the Tujuh Bukit Copper Project in Quarter
   2 2023 is Rp162.7 billion consisting of decline maintenance, underground resource definition drilling,
   and associated test work.
B. Area:
   Tujuh Bukit copper and gold resource, Banyuwangi, East Java.
C. Exploration Party:
Page 2
PT Merdeka Copper Gold Tbk
Treasury Tower Lantai 67 – 68, District 8 SCBD Lot 28
Jl. Jend Sudirman Kav 52-53, Senayan, Kebayoran Baru
Jakarta Selatan 12190, DKI Jakarta, Indonesia
Phone: +62 21 3952 5580
Fax: +62 21 3952 5589
www.merdekacoppergold.com



   All work was completed through a contracting agreement between Merdeka and PT Merdeka Mining
   Services.
D. Assessment Method:
   Drilling from underground and surface with associated test work.

E. Election of Assessment Area:
   The selected area for the current drilling program is an area of the Tujuh Bukit porphyry deposit that
   contains the largest zone of high-grade drilling results for copper and gold to date, and is well
   positioned for drilling from the current decline location.
F. Results of Exploration:
   6 underground rigs conducted Resource Definition drilling totalling 6,291.1 metres as shown in
   Table 1.
G. Action Plan:
   Diamond drilling will continue, with another underground diamond drill rig being added from the
   1st July.

                       Table 1: Tujuh Bukit copper project drilling statistics Quarter 2 2023

                                 Hole ID                From    To       Interval   Comments
                                 UHGZ-23-135A           613.7   938      324.3      UG
                                 UHGZ-23-145            0       455      455        UG
                                 UHGZ-23-137            409.9   917      507.1      UG
                                 UHGZ-23-143            0       589.9    589.9      UG
                                 UHGZ-23-143W           382.9   411.8    28.9       UG
                                 UHGZ-23-134            806.3   810.1    3.8        UG
                                 UHGZ-23-140            0       752.5    752.5      UG
                                 UHGZ-23-144            0       592.5    592.5      UG
                                 UHGZ-23-138            444.5   592.3    147.8      UG
                                 UHGZ-23-138W           268.3   785.8    517.5      UG
                                 UHGZ-23-136            659.5   860.5    201        UG
                                 UHGZ-23-141            0       942.6    942.6      UG
                                 UHGZ-23-139            564.7   1217.5   652.8      UG
                                 UHGZ-23-142            0       575.4    575.4      UG
Page 3
 PT Merdeka Copper Gold Tbk
 Treasury Tower Lantai 67 – 68, District 8 SCBD Lot 28
 Jl. Jend Sudirman Kav 52-53, Senayan, Kebayoran Baru
 Jakarta Selatan 12190, DKI Jakarta, Indonesia
 Phone: +62 21 3952 5580
 Fax: +62 21 3952 5589
 www.merdekacoppergold.com




                           Figure 2: Tujuh Bukit – underground drill holes – Quarter 2 2023



Gold and Silver: Tujuh Bukit Project

A. Expenditure:
   The total expenditure for exploration related activities for the Tujuh Bukit gold and silver project in
   Quarter 2 2023 is Rp45 billion consisting of life of mine resource definition drilling and regional
   exploration work.
B. Area:
   Tujuh Bukit gold and silver project, Banyuwangi, East Java.
C. Exploration Party:
   All work was completed through a contracting agreement between Merdeka and PT Merdeka Mining
   Servis.
D. Assessment Method:
   Drilling from surface, regional mapping, sampling and geophysical surveys.
E. Election of Assessment Area:
   The areas were selected for the life of mine drilling programs and for the regional work as they are
   near the current pits and with anomalous geochemical results.
F. Results of Exploration:
Page 4
PT Merdeka Copper Gold Tbk
Treasury Tower Lantai 67 – 68, District 8 SCBD Lot 28
Jl. Jend Sudirman Kav 52-53, Senayan, Kebayoran Baru
Jakarta Selatan 12190, DKI Jakarta, Indonesia
Phone: +62 21 3952 5580
Fax: +62 21 3952 5589
www.merdekacoppergold.com



   1 reverse circulation (RC) rig and 3 diamond drill (DD) rigs conducted drilling with a total of 12,618.2
   metres.
G. Action Plan:
   Life of Mine drilling will continue using 3 DD rigs and 1 RC rig.




                       Table 2: Tujuh Bukit surface drilling project statistics Quarter 2 2023

                                 Hole_ID                From    To      Interval   Comments
                                 GTD-23-747             124.5   354     229.5      Surface
                                 GTD-23-748             0       396.4   396.4      Surface
                                 GTD-23-749             0       250.7   250.7      Surface
                                 GTD-23-750             0       305.6   305.6      Surface
                                 GTD-23-751             0       381.2   381.2      Surface
                                 GTD-23-752             0       464.6   464.6      Surface
                                 GTD-23-753             0       164.7   164.7      Surface
                                 GTD-23-754             0       109.5   109.5      Surface
                                 GTR-23-597             0       350     350        Surface
                                 GTR-23-599             0       290     290        Surface
                                 GTR-23-600             0       280     280        Surface
                                 GTR-23-601             0       200     200        Surface
                                 GTR-23-602             0       250     250        Surface
                                 GTR-23-604             30      200     170        Surface
                                 GTR-23-606             0       250     250        Surface
                                 GTR-23-608             0       270     270        Surface
                                 GTR-23-609             0       350     350        Surface
                                 GTR-23-610             0       400     400        Surface
                                 GTR-23-611             0       270     270        Surface
                                 GTR-23-612             0       350     350        Surface
                                 GTR-23-613             0       350     350        Surface
                                 GTR-23-614             0       350     350        Surface
                                 GTR-23-615             0       350     350        Surface
                                 GTR-23-616             0       380     380        Surface
                                 GTR-23-617             0       350     350        Surface
                                 GTR-23-618             0       325     325        Surface
                                 GTR-23-619             0       12      12         Surface
                                 GTR-23-619A            0       220     220        Surface
                                 GTR-23-620             0       30      30         Surface
                                 GTR-23-620A            0       380     380        Surface
Page 5
PT Merdeka Copper Gold Tbk
Treasury Tower Lantai 67 – 68, District 8 SCBD Lot 28
Jl. Jend Sudirman Kav 52-53, Senayan, Kebayoran Baru
Jakarta Selatan 12190, DKI Jakarta, Indonesia
Phone: +62 21 3952 5580
Fax: +62 21 3952 5589
www.merdekacoppergold.com



                                 Hole_ID                From   To    Interval   Comments
                                 GTR-23-621             0      325   325        Surface
                                 GTR-23-622             0      220   220        Surface
                                 GTR-23-623             0      260   260        Surface
                                 GTR-23-624             0      300   300        Surface
                                 GTR-23-625             0      180   180        Surface
                                 GTR-23-626             0      115   115        Surface
                                 GTR-23-627             0      120   120        Surface
                                 GTR-23-628             0      115   115        Surface
                                 GTR-23-629             0      200   200        Surface
                                 GTR-23-630             0      100   100        Surface
                                 GTR-23-631             0      220   220        Surface
                                 GTR-23-632             0      210   210        Surface
                                 GTR-23-633             0      180   180        Surface
                                 GTR-23-635             0      200   200        Surface
                                 GTR-23-636             0      204   204        Surface
                                 GTR-23-637             0      200   200        Surface
                                 GTR-23-638             0      200   200        Surface
                                 GTR-23-639             0      120   120        Surface
                                 GTR-23-640             0      200   200        Surface
                                 GTR-23-641             0      200   200        Surface
                                 GTR-23-642             0      120   120        Surface
                                 GTR-23-643             0      150   150        Surface
Page 6
 PT Merdeka Copper Gold Tbk
 Treasury Tower Lantai 67 – 68, District 8 SCBD Lot 28
 Jl. Jend Sudirman Kav 52-53, Senayan, Kebayoran Baru
 Jakarta Selatan 12190, DKI Jakarta, Indonesia
 Phone: +62 21 3952 5580
 Fax: +62 21 3952 5589
 www.merdekacoppergold.com




                               Figure 3: Tujuh Bukit surface drilling map – Quarter 2 2023




Copper: Wetar Project

A. Expenditure:
   Total estimated exploration cost for the Wetar Project in Quarter 2 2023 is Rp39.6 billion.
B. Area:
   Wetar Project, Wetar Island, West Maluku.
C. Exploration Party:
   All work was completed through a contracting agreement between Merdeka and PT Merdeka Mining
   Servis.
D. Assessment Method:
   Geological interpretation, geochemical surveys, geophysical surveys and previous drilling.
E. Election of Assessment Area:
Page 7
PT Merdeka Copper Gold Tbk
Treasury Tower Lantai 67 – 68, District 8 SCBD Lot 28
Jl. Jend Sudirman Kav 52-53, Senayan, Kebayoran Baru
Jakarta Selatan 12190, DKI Jakarta, Indonesia
Phone: +62 21 3952 5580
Fax: +62 21 3952 5589
www.merdekacoppergold.com



   The exploration areas were selected from the previous significant drill intersections, ground and
   airborne electromagnetic (EM) geophysical surveys and historical mining activity which identified
   features with potential for VMS deposits.
F. Results of Exploration:
   2 drill rigs operated during the quarter with 79 drill holes completed (including 7 metallurgical holes)
   for a total drilled depth of 11,724.45 metres in Partolang.
G. Action Plan:
   Infill and extension resource drilling will continue in the Partolang area, included metallurgical drilling
   utilising 1 DD and 1RC rig.


                                  Table 3: Wetar project drilling statistics Quarter 2 2023


                               Holes              Metres
       Drill Type                                                       HoleID                          Details
                             Completed           Drilled (m)

                                                                                      Extension drilling to
                                                               PTDM0129,   PTDM0131-
                                                                                      define resources. 7holes
                                                               PTDM0136,    PTDR0130,
   DD Partolang              12                 2,115.45                              drilled for metallurgical
                                                               PTDR0137-PTDR0139,
                                                                                      and 2holes drilled as
                                                               BMDR0052
                                                                                      twin holes

                                                                                              Infill drilling and extension
   RC Partolang              67                 9,609          PTRR0336-PTRR0402
                                                                                              drilling in Partolang

   Totals                    79                 11,724.45
Page 8
 PT Merdeka Copper Gold Tbk
 Treasury Tower Lantai 67 – 68, District 8 SCBD Lot 28
 Jl. Jend Sudirman Kav 52-53, Senayan, Kebayoran Baru
 Jakarta Selatan 12190, DKI Jakarta, Indonesia
 Phone: +62 21 3952 5580
 Fax: +62 21 3952 5589
 www.merdekacoppergold.com




                      Figure 4: Drilling status for DD & RC holes in Partolang - Quarter 2 2023

Gold: Pani Project

A. Expenditure:
   Total estimated exploration costs for the Pani Project in Quarter 2 2023 is Rp94.1 billion.
B. Area:
   Pani Project, Gorontalo Province, Sulawesi.
C. Exploration Party:
     All work was completed through a contracting agreement between Merdeka and PT Merdeka
   Mining Servis.
D. Assessment Method:
   Diamond drilling with 12 drill rigs, relogging historical drill core, geological mapping and alteration
   mineral analysis by LIBS and XRF.
E. Election of Assessment Area:
   The area selected for drilling was chosen as there is a gap between historical drilling within the IUP
   and that of the adjoining CoW.
F. Results of Exploration:
Page 9
PT Merdeka Copper Gold Tbk
Treasury Tower Lantai 67 – 68, District 8 SCBD Lot 28
Jl. Jend Sudirman Kav 52-53, Senayan, Kebayoran Baru
Jakarta Selatan 12190, DKI Jakarta, Indonesia
Phone: +62 21 3952 5580
Fax: +62 21 3952 5589
www.merdekacoppergold.com



    151 drill holes were completed for total of 20,434.80 metres during Quarter 2 2023, for resource
    definition, metallurgy and sterilisation drilling programs. The progress of the current drilling program
    is shown in Figure 5.


G. Action Plan:
    The diamond drilling program will continue using 12 diamond drill rigs for resource definition and
    sterilisation drilling programs.


                                  Table 4: Pani project drilling statistics Quarter 2 2023

       Campaign               Holes                 Metres
                                                                      Hole_ID                       Details
                            Completed               Drilled
    GSM Resource
                  13                            2,297.90      GSDR0011-GSDR0023              Infill Drilling
    Definition
    GSM
                  18                            2,583.10      GSDS0018-GSDS0035              Sterilisation Drilling
    Sterilisation

    PETS Resource                                             PEDR0060-PEDR0177,
                  120                           15,553.80                                    Infill Drilling
    Definition                                                PEDR0179, PEDR0186

    Totals                  151                 20,434.80
Page 10
PT Merdeka Copper Gold Tbk
Treasury Tower Lantai 67 – 68, District 8 SCBD Lot 28
Jl. Jend Sudirman Kav 52-53, Senayan, Kebayoran Baru
Jakarta Selatan 12190, DKI Jakarta, Indonesia
Phone: +62 21 3952 5580
Fax: +62 21 3952 5589
www.merdekacoppergold.com




       Figure 5: Pani Proposed and Completed Drill Holes Overlain on Topography – Quarter 2 2023

File

File Open PDF
Source IDX
Size0.83 MB
Published10 Jul 2023
Pages10
Characters16,798
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 0 people and organisations named in the text · linked when the evidence is strong

The name pass has not read this document yet.

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result