(SP BRM PT Bumi Resources Minerals Tbk. Bakrie Tower, 6 & 10" Floor Komplek Rasuna Epicentrum Jl. H.R. Rasuna Said, Kuningan Jakarta Selatan 12940 Indonesia T 462 21 5794 5698 F 462 2157945687 www.bumiresourcesminerals.com LAPORAN TENTANG AKTIVITAS EKSPLORASI OLEH ANAK PERUSAHAAN PT BUMI RESOURCES MINERALS TBK. (REPORT ON EXPLORATION ACTIVITIES BY SUBSIDIARIES OF PT BUMI RESOURCES MINERALS TBK.) PT Citra Palu Minerals Nama Perusahaan (Name of Company Tahap Kegiatan KK (Phase of Activity of Contract of Work) Laporan Eksplorasi Periode (Period of Exploration Report PT Citra Palu Minerals (“PT CPM”) Operasi Produksi (Production Operation) April - Juni (April - June) 2023 A. | Daerah Eksplorasi Exploration Areas 1. Blok I, Sulawesi Tengah (Operasi Produksi) 1. Block 1, Central Sulawesi (Production Operation) 2. Blok II, Sulawesi Selatan (Eksplorasi) 2. Block II, South Sulawesi (Exploration) 3. Blok IV, Sulawesi Tengah (Eksplorasi) 3. Block IV, Central Sulawesi (Exploration) 4. Blok V, Sulawesi Tengah (Eksplorasi) 4. Block V, Central Sulawesi (Exploration) 5. Blok VI, Sulawesi Tengah (Eksplorasi) 5. Block VI, Central Sulawesi (Exploration) B. | Biaya Eksplorasi Exploration Cost 738.968,47 Dollar AS USD738,968.47 C. | Bentuk Kegiatan Eksplorasi Form of Exploration Activities 1. Melanjutkan kegiatan pengeboran sumber daya di Prospek River Reef, Blok I Poboya, dengan total kedalaman sebesar 43.073,90 meter dari target sebesar 46.916 meter. 2. Melanjutkan kegiatan pengeboran sumber daya di Prospek Hill Reef 1, Blok I Poboya, dengan total kedalaman sebesar 14.350,05 meter dari target sebesar 14.445 meter. 3. Melanjutkan kegiatan pengeboran sumber daya di area Watu Putih, Blok I Poboya, dengan total kedalaman sebesar 6.231,45 meter dari target sebesar 10.000 meter. 4. Melanjutkan kegiatan pengeboran eksplorasi di area Prospek Hill Reef 2, Blok | Poboya, dengan total kedalaman 1.006,20 meter dari target 29.450 meter 1. Continuing the resources drilling program in River Reef Prospect, Block 1 Poboya, with total depth of 43,073.90 metres from target amount of 46,916 metres. 2. Continuing the resources drilling program in Hill Reef 1 Prospect, Block I Poboya, with total depth of 14,350.05 metres from target amount of 14,445 metres. 3. Continuing the resources drilling program in Watu Putih area, Block 1 Poboya, with a total depth of 6,231.45 metres from target amount of 10,000 metres. 4. Continuing exploration drilling in Hill Reef 2 Prospect, Blok 1 Poboya, with a total depth 1,006.20 metres from target amount of 29,450 metres.
Page 2 OCR 0.921
(SP BRM . Melanjutkan kegiatan pemetaan geologi di area Malomba dan Anggasan, Blok IV dengan total 55 sampel batuan dan 191 sampel tanah Total sampel pengeboran Prospek River Reef Blok | Poboya yaitu sebanyak 37.133 sampel dikirimkan ke Laboratorium PT Geoservices untuk dianalisis geokima (Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Hg dan kombinasi Au 4 ICP 42 unsur), 229 sampel untuk analisis AAT (Air Asam Tambang), serta dilakukan uji geoteknik terhadap 132 sampel pada Laboratorium Geomekanika dan Peralatan Tambang, Institut Teknologi Bandung (ITB). Selain itu, sebanyak 74 sampel dikumpulkan dan dikomposit menjadi 6 sampel domain untuk pengujian metalurgi di Laboratorium PT Indo Mineral Research Total sampel pengeboran di area Prospek Hill Reef 1 Blok | Poboya yaitu sebanyak 12.699 sampel dikirimkan ke Laboratorium PT Geoservices untuk dianalisis geokima (Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Hg dan kombinasi Au # ICP 42 unsur), 218 sampel untuk analisis AAT (Air Asam Tambang), serta 108 sampel untuk pengujian metalurgi. Selain itu, sebanyak 25 sampel dikumpulkan dan dikirimkan untuk dilakukan pengujian geoteknik pada Laboratorium Geomekanika dan Peralatan Tambang, Institut Teknologi Bandung (ITB) Total sampel pengeboran eksplorasi Prospek Watu Putih (Scout Drill) Blok | Poboya sebanyak 3.489 sampel dikirimkan ke Laboratorium PT Geoservices untuk dianalisis geokimia (Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Hg dan kombinasi Au 4 ICP 42 unsur) serta 44 sampel untuk analisis AAT (Air Asam Tambang). Total sampel pengeboran eksplorasi Prospek Hill Reef 2 (Scout Drill), Blok I Poboya sebanyak 1.160 sampel dikirimkan ke Laboratorium PT Geoservices untuk dianalisis geokimia (Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Hg dan kombinasi Au 4 ICP 42 unsur) serta 27 sampel untuk analisis AAT Continuing geological mapping activity at Malomba and Anggasan Areas, Block IV with ad total of collected samples of 55 rock samples and 191 soil samples. Total samples collected from drilling program in River Reef Prospect of Block 1 Poboya were 32,133 samples and sent to PT Geoservices Laboratory to conduct geochemical analysis (Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Hg and combination Of Au # ICPOES 42 elements), 229 samples for ARD (Acid Rock Drainage) Analysis, and also geotechnical test had been done to 132 samples to the Geomechanics and Mining Egutoment Laboratory, Bandung Institute of Technology (ITB). Moreover, a total of 74 samples were collected and composited into 6 sample domains for metallurgical test in PT Indo Mineral Research's Laboratory. Total samples collected from drilling program in HINI Reef 1 Prospect, Block 1 Poboya, were 12699 samples and sent to PT Geoservices Laboratory to conduct geochemical analysis (Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Hg and combination of Au # ICPOES 42 elements), 218 samples for ARD (Acid Rock Drainage) Analysis, and 108 samples for metallurgical test. Moreover, a total of 25 samples were collected for geotechnical testing at the Geomechanics and Mining Eguipment Laboratory, Bandung Institute of Technology (ITB). Total samples collected from exploration drilling program in Watu Putih Prospect (Scout Drill) of Block I Poboya were 3,489 samples and sent to PT Geoservices Laboratory to conduct geochemical analysis (Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Hg and combination of Au # ICPOES 42 elements) also 44 samples for ARD (Acid Rock Drainage) Analysis. Total samples collected from exploration drilling program in Hill Reef 2 Prospect (Scout Drill) of Block I Poboya were 1,160 samples and sent to PT Geoservices Laboratory to conduct geochemical analysis (Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Hg and combination of Au # ICPOES 42 A
Page 3 OCR 0.893
(SP BRM 10 (Air Asam Tambang). Total sampel pengeboran eksplorasi Prospek Barako (Scout Drill), Blok | Poboya sebanyak 221 sampel dikirimkan ke Laboratorium PT Geoservices untuk dianalisis geokimia (Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Hg dan kombinasi Au 4 ICP 42 unsur) serta 7 sampel untuk analisis AAT (Air Asam Tambang) elements) also 27 samples for ARD (Acid Rock Drainage) Analysis. 10. Total samples collected from exploration drilling program in Barako Prospect (Scout Drill) of Block 1 Poboya were 221 samples and sent to PT Geoservices Laboratory to conduct geochemical analysis (Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Hg and combination of Au 4 ICPOES 42 elements) also 7 samples for ARD (Acid Rock Drainage) Analysis. Pihak-Pihak yang Terlibat Involved Parties 1. Laboratorium PT CPM 1. Internal PT CPM Laboratory 2. PT Sumagud Sapta Sinar 2. PT Sumagud Sapta Sinar 3. Laboratorium PT Geoservices 3. PT Geoservices Laboratory 4. Bureau Varitas — PT IOL Indonesia 4. Bureau Varitas — PT IOL Indonesia 5. PT Pos Indonesia 5. PT Pos Indonesia 6. PT Intertek Utama Service 6. PT Intertek Utama Service 7. Laboratorium Geomekanika dan Peralatan 7. Geomechanics and Mining Eguipment Tambang ITB Laboratory, Bandung Institute of Technology 8. PT Indo Mineral Research 8. PT Indo Mineral Research Metode Pengujian dan Pemilihan Areal Testing Method and Selection Area 1. AAS 1. AAS 2. Spedfic Gravity 2. Specific Gravity 3. Fire Assay 3. Fire Assay 4. Agua Regia Digest 4. Agua Regia Digest 5. Hg Analisis 5. Hg Analysis 6. ICP OES 42 unsur 6. ICP OES 42 elements 7. Natural density, dry density, saturated density, | Z. Natural density, dry density, saturated density, Brazillian test, direct shear, ultrasonic velocity, Brazillian test, direct shear, ultrasonic velocity, UCS UCS 8. Analisis Air Asam Tambang ARD Test 9. Uji Physical Properties (PP), Uji Uniaxial| 9 Physical Properties Test (PP) Uniaxial Compressive Strength (UCS), Uji Triaxial Compressive Strength (UCS) Test, Triaxial Test 10. Pengujian kominusi (Abrasion Index, BRMI, SMC, | 70. JKBMM), Head Grade, Sianidasi, Column Test Comminution Test (Abrasion Index BRMi, SMC, IKBMM), Head Grade, Cyanidation, Column Test Kemajuan Eksplorasi Terhadap Kegiatan Triwulan Sebelumnya Exploration Progress towards Guarters Activities the Preceding 1 Pengeboran sumber daya di Prospek River Reef dilakukan dengan menggunakan 4 rig. Total 212 titik bor dengan total kedalaman 43.073,90 meter sampai akhir bulan Juni 2023. Terdapat 1. Resources drilling program in Poboya River Reef Prospect Block I was conducted using 4 rigs. A total of 212 drill holes with total depth of 43,073.90 metres has been achieved by the end Of June 2023. There are additional 23 drill holes Aa
Page 4 OCR 0.923
(SP BRM penambahan 23 titik bor dengan jumlah kedalaman 5.406,70 meter dari periode sebelumnya. Pengeboran sumber daya di Prospek Hill Reef 1 Poboya sepanjang periode AprilJuni 2023 dilakukan dengan menggunakan 1 rig. Total 151 titik bor dengan total kedalaman 14.350,05 meter telah dibor sampai akhir bulan Juni 2023. Terdapat penambahan 3 titik bor dengan jumlah kedalaman 188,60 meter dari periode sebelumnya. Pengeboran eksplorasi di Prospek Watu Putih dilanjutkan dengan menggunakan 2 rig. Total 8 titik bor dengan total kedalaman 6.231,45 meter sampai akhir bulan Juni 2023. Terdapat penambahan 3 titik bor dengan jumlah kedalaman 2.746,55 meter dari periode sebelumnya. Pengeboran eksplorasi di Prospek Hill Reef 2 dilanjutkan dengan menggunakan 1 rig. Total 7 titik bor dengan total kedalaman 1.066,20 meter sampai akhir bulan Juni 2023. Terdapat penambahan 1 titik bor dengan jumlah kedalaman 153,60 meter dari periode sebelumnya. Penambahan jumlah sampel sebanyak 3.220 sampel hasil pengeboran Prospek River Reef Blok | Poboya yang dikirim ke Laboratorium PT Geoservices untuk dianalisis geokimia (Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Hg dan kombinasi Au 4 ICP 42 unsur), 18 sampel untuk analisis AAT (Air Asam Tambang), 12 sampel untuk analisis metalurgi, serta 26 sampel untuk analisis geoteknik. Penambahan jumlah sampel sebanyak 475 sampel hasil pengeboran Prospek Hill Reef 1 Blok | Poboya yang dikirim ke Laboratorium PT Geoservices untuk dianalisis geokimia (Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Hg dan kombinasi Au 4 ICP 42 unsur dan 2 sampel untuk analisis geoteknik. Penambahan jumlah sampel sebanyak 2.068 sampel hasil pengeboran Prospek Watu Putih Blok | Poboya yang dikirim ke Laboratorium PT with total depth of 5,406.70 metres from the previous period, Resources drilling program in Pobaya Hill Reef | Prospect during the period of April-June 2023 was conducted using 1 rig. A total of drill holes with total depth of 14,350.05 metres has been achieved by the end of June 2023. There are additional 3 drill holes with total depth of 188.60 metres from the prewous period, Exploration drilling program in Watu Putih Prospect was continued using 2 rigs. A total of 8 drill holes with total depth of 6,231.45 metres has been achieved by the end of June 2023. There are additional 3 drill holes with total depth of 2,746.55 metres from the previous period. Exploration drilling program in Hill Reef 2 Prospect was continued using 1 rig. A total of 7 drill holes with total depth of 1,066.20 metres has been achieved by the end of June 2023. There is additional 1 drill hole with total depth of 153.60 metres from previous period. Additional 3,220 drill core samples from River Reef Prospect of Block I Poboya drilling program have been sent to PT Geoservices Laboratory to be analyzed (Au, Ag, u, Pb, Zn, As, Sb, Mo, Hg and combination of Au # ICP 42 elements), 18 samples for ARD (Acid Rock Drainage), 12 samples for metalurgical test, and also 26 samples for geotechnical test. Additional 475 drill core samples from Hill Reef 1 Prospect of Block I Poboya drilling program have been sent to PT Geoservices Laboratory to be analyzed (Au, Ag, u, Pb, Zn, As, Sb, Mo, Hg and combination of Au 4 ICP 42 elements) and 2 samples for geotechnical test. Additional 2068 drill core samples from Watu Putih Prospect of Block 1 Poboya drilling program have been sent to PT Geoservices
Page 5 OCR 0.916
(PP BRM Geoservices untuk dianalisis geokimia (Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Hg dan kombinasi Au 4 ICP 42 unsur dan 20 sampel untuk analisis air asam tambang. 8. Total penambahan sebanyak 6 sampel batuan dan 167 sampel tanah berasal dari kegiatan pemetaan geologi di Area Anggasan dan Malomba, Blok IV Laboratory to be analyzed (Au, Ag, u, Pb, Zn, As, Sb, Mo, Hg and combination of Au # ICP 42 elements) and 20 samples for ARD (Acid Rock Drainage). 8. Total additional of 6 rock samples and 167 soil samples were collected from geological mapping activity at Anggasan dan Malomba Areas, Block IV. Rencana Selanjutnya Next Plan 1. Melanjutkan kegiatan pengeboran di Prospek River Reef, Blok I Poboya dengan tujuan untuk menambah sumber daya di Prospek River Reef. 2. Melanjutkan kegiatan pengeboran di Prospek Watu Putih Blok I Poboya dengan tujuan untuk mendefinisikan sumber daya di Prospek River Reef. 3. Melanjutkan kegiatan pengeboran eksplorasi di Prospek Hill Reef 2, Blok | Poboya dengan tujuan untuk mengetahui kemenerusan mineralisasi di bawah permukaan 4. Melanjutkan pemetaan geologi detail di Area Malomba dan Taanes - Ogowele, Blok IV. 1. Continue resources drilling program in River Reef Prospect of Block I Poboya Prospect with Objectives to add resources in River Reef Prospect. 2. Continue resources drilling program in Watu Putih Prospect of Block I Poboya Prosoect with the objective of resources definition in Watu Putih Prospect. 3. Continue exploration drilling program in Hill Reef 2 Prospect of Block I Poboya Prospect with the objective of testing the mineralization continuity below the surface. 4. Continue geological detailed mapping at Malomba and Taanes - Ogowele Area, Block IV. Hambatan Eksplorasi Barriers to Exploration 1. Kegiatan penambangan tanpa izin (PETI) oleh masyarakat sekitar. 2. Pembebasan lahan. 1. Ilegal mining activities by locals. 2. land acguisition. Perizinan/ Persetujuan Baru Yang Diperoleh New Permits/Approvals Acguired
Page 6 OCR 0.913
1 (SP BRM PT Dairi Prima Mineral Nama Perusahaan (Name of Company Tahap Kegiatan KK (Phase of Activity of Contract of Work) Laporan Eksplorasi Periode (Period of Exploration Report) PT Dairi Prima Mineral (“PT DPM") Operasi Produksi (Production Operation) April - Juni (April - June) 2023 A. | Daerah Eksplorasi Exploration Areas Kegiatan eksplorasi pada Prospek Anjing Hitam | Exoloration actiuities in Anjing Hitam Prospect sudah selesai dilakukan dan saat ini prospek | have already been completed. The prospect tersebut memasuki tahap Operasi Produksi currently is in Production Operation stage. Selain Prospek Anjing Hitam, di dalam wilayah | Besides Anjing Hitam Prospect, there are some Kontrak Karya DPM masih terdapat prospek- | other prospect areas within DPM Contract of prospek lainnya dengan tahap kegiatan yang | Work tenement. The prospects' work progresses berbeda-beda dari eksplorasi regional hingga | are in different stages, ranging from regional pengeboran deliniasi sumberdaya. exploration to delineation resource drilling. Salah satu prospek yang paling maju | Lae Jehe Prospect is the most advantageous pengerjaannya adalah Prospek Lae Jehe yang | exploration — prospect which — is located terletak sekitar 200 meter di sebelah barat laut | approximately 200 meters toward northwest from Prospek Anjing Hitam. Prospek ini sudah | Anjing Hitam Prospect. This prospect work stage is memasuki tahap pengeboran deliniasi | im resource delineation drilling and will be sumberdaya dan masih akan dikembangkan | developed to get final mineral resource value with hingga didapatkan sumber daya mineral | dominant measured and indicated mineral dengan klasifikasi terukur dan tertunjuk yang | resources dassification. lebih dominan. B. | Biaya Eksplorasi Exploration Cost 21.036,11 Dollar AS USD21,036.11 C. | Bentuk Kegiatan Eksplorasi Form of Exploration Activities Selama bulan April hingga Juni 2023, tidak | In the period of April to June 2023, there was no terdapat kegiatan eksplorasi yang dilakukan exploration activity being carried out. D. | Pihak-Pihak yang Terlibat Involved Parties E. | Metode Pengujian dan Pemilihan Areal Testing Method and Selection of Area F. | Kemajuan Eksplorasi Terhadap Kegiatan | Exploration Progress relative to Preceding Triwulan Sebelumnya Guarter's Activities G. | Rencana Pengeboran Selanjutnya Next Drilling Plan Pengeboran sumberdaya pada Prospek Lae Jehe. Resource drilling at the Lae Jehe Prospect.
Page 7 OCR 0.900
(PP BRM Hambatan Eksplorasi Barriers to Exploration Perizinan/Persetujuan Baru Yang Diperoleh New Permits/Approvals Acguired Persetujuan Rencana Kerja dan Anggaran Biaya (RKAB) DPM No. B-793/MB.04/DJB.M/2023 tertanggal 15 Maret 2023 Approval of DPM' Work and Budget Plan (RKAB) No. B-793/MB.04/DJB.M/2023 dated 15 March 2023.
Page 8 OCR 0.876
(S BRM PT Gorontalo Minerals Nama Perusahaan (Warne of Company Tahap Kegiatan KK (Phase of Activity of Contract of Work) Laporan Eksplorasi Periode (Period of Exploration Report) PT Gorontalo Minerals (“PT GM”) Operasi Produksi (Production Operation) April - Juni (April - June) 2023 A. | Daerah Eksplorasi Exploration Areas 1. Prospek Sungai Mak, Blok 1 (Tombulilato), | 1. Sungai Mak Prospect, Block 1 (Tombulilato), Gorontalo Gorontalo 2. Prospek Motomboto North, Blok 1|2 Motomboto North Prospect, Block 1 (Tombulilato), Gorontalo (Tombulilato), Gorontalo 3. Prospek Motomboto — East, Blok 1| 3 Motomboto East Prospect, Block 1 (Tombulilato), Gorontalo (Tombulilato), Gorontalo B. | Biaya Eksplorasi Exploration Cost 195.957,28 Dollar AS USD195,957.28 C. | Bentuk Kegiatan Eksplorasi Form of Exploration Activities 1 Pengeboran eksplorasi di area Prospek Motomboto North, Blok | Tombulilato dengan kemajuan kedalaman pemboran sebesar 14.786,50 meter dari total rencana terbaru sebesar 18.213,85 meter dan telah menyelesaikan 91 lubang bor dari total 105 rencana lubang bor telah selesai dilakukan. Total — sampel pengeboran — Prospek Motomboto North, Blok 1 Tombulilato sebanyak 9.107 conto inti bor telah dikirimkan ke Laboratorium PT Geoservices untuk analisis geokimia. Melakukan analisis 19 sampel petrografi dan 18 sampel mineragrafi dari Prospek Motomboto North, Blok 1 Tombulilato di Laboratorium LAPI-TB. Melanjutkan pengeboran eksplorasi di area Prospek Motomboto East, Blok | Tombulilato dengan kemajuan kedalaman pemboran sebesar 10.200,40 meter dari total rencana terbaru sebesar 13.406,75 meter dan telah menyelesaikan 58 lubang bor dari total 77 rencana lubang bor. 1. Exploration drilling in Motomboto North Prospect area, Block / Tombulilato with drilling progress of 14,786.50 metres from a total newest plan of 18,213.85 metres and already completed 91 drill holes of a total of 105 planned drill holes had been carried out. 2. A total of 9107 core samples from Motomboto North Prospect, Block 1 Tombulilato have been sent to the PT Geoservices Laboratory for geochemical analysis. 3. Conducting sample analysis of 19 petrograohy samples and 18 mineragraphy from the Motomboto North Prospect, Block 1 Tombulilato in LAPI-ITB Laboratory. 4. Continuing exploration drilling in Motomboto East Prospect area, Block 1 Tombulilato with drilling progress of 10.200,40 metres from & total newest plan of 13.406,75 metres and already completed 58 drill holes of a total of 77 planned drill holes.
Page 9 OCR 0.892
(SP BRM 5. Total sampel pengeboran Prospek | 5 A4 total of 8&741 core samples from Motomboto East, Blok | Tombulilato Motomboto East Prospect, Block 1 Tombulilato sebanyak 8.741 conto inti bor telah have been sent to the PT Geoservices dikirimkan ke Laboratorium PT Geoservices Laboratory for geochemical analysis. untuk analisis geokimia. 6. Melakukan pengeboran hidrologi dan | & Conducting hydrology and hidrogeology hidrogeologi pada Prospek Motomboto drilling in Motomboto East Prospect, Block 1 East, Blok | Tombulilato, Tombulilato. 7. Melakukan pengujian dan studi Air Asam | 2. Conducting Acid Rock Drainage analysis and Tambang sebanyak 29 sampel dari Prospek study for 29 samples from Motomboto East Motomboto East di Laboratorium Teknik Prospect in the Environmental Engineering Lingkungan ITENAS Bandung. Laboratory of ITENAS Bandung. 8. Melakukan pemetaan geologi dan | & Conducting geological mapping and surface pengambilan sampel batuan permukaan di rock sampling in Kayu Bulan Prospect, Kayu area Prospek Kayu Bulan, Kayu Bulan Bulan South, Sungai Mak, and the pioneering South, Sungai Mak, dan jalan perintis road to Tombulilato. menuju Tombulilato. 9. Total sampel batuan permukaan sebanyak | 9. A4 total of 452 surface rocks sample from 452 sampel dari Kompleks Motomboto dan Motomboto complex and other mapping area pemetaan lainnya telah dikirim ke areas have been sent to the PT Geoservices Laboratorium PT Geoservices untuk analisis Laboratory for geochemical analysis. geokimia. 10. Menyelesaikan pengujian dan analisis | 70. Finishing metallurgical testing and analysis for metalurgi untuk Domain Oxide-Au pada Oxide-Au Domain of Sungai Mak Prospect in prospek Sungai Mak di Laboratorium Geoservices Laboratory under Metso-Outotec Geoservices dibawah pengawasan Metso- supervision. Outotec. 11. Melakukan pengiriman sebanyak 54 | 77. Shipping 54 rock samples from Motomboto sampel batuan dari Prospek Motomboto East Prospect, Block I Tombulilato to the ITB East, Blok | Tombulilato ke Laboratorium Geomechanics Laboratory for geotechnical Geomekanika ITB untuk analisis geoteknik. analysis. Pihak-Pihak yang Terlibat Involved Parties 1. PT Sumagud Sapta Sinar 1. PT Sumagud Sapta Sinar 2. PT Darma Henwa 2. PT Darma Henwa 3. Laboratorium PT Geoservices 3. PT Geoservices' Laboratory 4. Laboratorium Geomekanika ITB 4. ITB Geomechanics' Laboratory 5. Laboratorium Teknik Lingkungan ITENAS 5. ITENAS Environmental Technic's Laboratory 6. PT Adiprotek Envirodunia 6. PT Adiprotek Envirodunia
Page 10 OCR 0.886
(SP BRM TK: 8. PT ITS Tekno Sains PT LAPI ITB Z 8. PT ITS Tekno Sains PT LAPI ITB Metode Pengujian dan Pemilihan Areal Testing Method and Selection of Area Kemajuan Triwulan Sebelumnya Eksplorasi Terhadap Kegiatan Exploration Progress toward Previous Guarter's Activities 1 Kemajuan aktivitas pengeboran di Prospek Motomboto North mencakup penambahan 1 lubang bor dengan total kedalaman sebesar 359,5 meter. 1 The progress of drilling activities in the Motomboto North Prospect induded the addition of 1 drill hole with total depth of 359.5 metres. fase keempat untuk Domain Supergen dari 2. Penambahan jumlah sampel sebanyak 243 | 2. The adoltion Of 293 samples rom sampel dari hasil pengeboran pada Prospek Motomboto North drilling sent 10 the Motomboto North yang dikirim ke Geoservices Laboratory for analysis. Laboratorium Geoservices untuk dianalisis. 3. Kemajuan aktivitas pengeboran di Prospek | 3. The progress of drilling activities in the Motomboto East mencakup penambahan Motomboto East Prospect induded the 20 lubang bor dengan total kedalaman adaition of 20 drill holes with total depth of sebesar 3.267,15 meter Meet mala 4. Penambahan jumlah sampel sebanyak | 4 The addition of 3966 samples rom 3.966 sampel dari hasil pengeboran pada Motomboto East drilling sent H0 the Prospek Motomboto East yang dikirim ke Geoservices Laboratory for analysis. Laboratorium Geoservices untuk dianalisis. 5. Melakukan pengujian dan analisis sampel | 5. Conducting testing and analysis of GAGC assay @GAOC pada laboratorium sekunder assay samples in the secondary laboratory to untuk membandingkan hasil analisis yang compare the results of the analysis that has telah dilakukan oleh laboratorium been carried out by the Geoservices Geoservices sebagai laboratorium primer. laboratory as the primary laboratory. Rencana Selanjutnya Next Plan 1. Melanjutkan pengeboran eksplorasi di | 7. Continuing exploration drilling in Motomboto Prospek Motomboto East. East Prospect. 2. Melanjutkan kegiatan pemetaan geologi | 2 Continuing geological mapping and surface dan pengambilan sampel batuan rock sampling in Kayu Bulan Prospect, Kayu permukaan di area Prospek Kayu Bulan, Bulan South, Sungai Mak, and the pioneering Kayu Bulan South, Sungai Mak, dan jalan road to Tombulilato. perintis menuju Tombulilato. 3. Melakukan penyusunan Studi Kelayakan | 3. Conducting Feasibility Study for North untuk Prospek Motomboto North Motomboto Prosoect. 4. Melakukan pengujian dan analisis metalurgi | & Continuing metallurgical testing and analysis for Supergene Domain of Sungai Mak
Page 11 OCR 0.914
(SP BRM Prospek Sungai Mak di Laboratorium Geoservices dibawah pengawasan Metso- Outotec. Melakukan pengujian dan analisa metalurgi untuk sampel komposit dari Prospek Motomboto North dan Prospek Motomboto East. Melanjutkan estimasi cadangan mineral pada Prospek Motomboto North. Prospect to the fourth phase in Geoservices Laboratory under Metso-Outotec's supervision. Conducting metallurgical testing and analysis for composite sample of Motomboto North Prospect and Motomboto East Prospect. 6. Continuing mineral reserves estimation of Motomboto North Prospect. Hambatan Eksplorasi Barriers to Exploration 1. Adanya aktivitas Penambangan Tanpa Izin (PETI) di area rencana pengeboran Prospek Motomboto: LA An Illegal Mining Activity (PETI) in the drilling planned area of the Motomboto Prospect. 2. Munculnya aktivitas Penambangan Tanpa | 2. Mew Illegal Mining Activity (PETI) in the Izin (PETI) baru di area sepanjang jalur opening area alongside the pioneering road bukaan jalan perintis construction. Perizinan/Persetujuan Baru Yang Diperoleh New Permits/Approvals Acguired
Page 12 OCR 0.922
(SS BRM IV. PT Linge Mineral Resources Nama Perusahaan (Name of Company) Tahap Kegiatan IUP (Phase of Activity of Mining Permit) Laporan Eksplorasi Periode (Period of Exploration Reporh PT Linge Mineral Resources (“PT LMR”) Eksplorasi (Exploration) April - Juni (April - June) 2023 AA. | Daerah Eksplorasi Exploration Areas 1. Prospek Bulan (Proyek Abong) 1. Bulan Prospect (Abong Project) 2. Prospek Bintang 1 (Proyek Abong) 2. Bintang 1 Prospect (Abong Project) 3. Prospek Bintang 2 (Proyek Abong) 3. Bintang 2 Prospect (Abong Project) B. | Biaya Eksplorasi Exploration Cost 40.210 Dollar AS USD40,210 C. | Bentuk Kegiatan Eksplorasi Form of Exploration Activities 1. Pada periode ini, PT LMR tidak melakukan | 7. During this period, PT LMR did not conduct kegiatan eksplorasi di lapangan. Adapun exploration activities in the field. The activities kegiatan yang dilakukan sebatas melakukan which had been carried out were limited to pemeliharaan camp dan aset camps and assets maintenance. 2. Pada periode ini, PT LMR masih dalam | 2. During this period, PT LMR was still in the proses penyelesaian studi AMDAL. process of completing an AMDAL study. 3. Pada periode ini, PT LMR masih dalam | 3. During this period, PT LMR was still in the proses Permohonan Persetujuan Teknis process of appiying for Technical Approval for Penimbunan Limbah Bahan Berbahaya dan the Stockpiling of Hazardous and Toxic Waste Beracun kepada Kementerian Lingkungan to the Ministry of Environment and Forestry. Hidup dan Kehutanan. 4. Pada periode ini, PT LMR masih dalam | 4 puring this period PT LMR was still in the proses permohonan perpanjangan process of appiying for an extension of the Persetujuan Penggunaan Kawasan Hutan Approval for the Use of Forest Areas for untuk Kegiatan Survei Pendahuluan kepada Preliminary Survey Activities to the Ministry of Kementerian Lingkungan Hidup dan Environment and Forestry according to letter Kehutanan sesuai surat Nomor: Number: 02INAMR/2023 dated 5 May 2023. 021N//LMR/2023 tanggal 5 Mei 2023. D. | Pihak-Pihak yang Terlibat Involved Parties PT Bahtera Ratu Engineering PT Bahtera Ratu Engineering E. | Metode Pengujian dan Pemilihan Areal Testing Method and Selection of Area Amdal Scope Amdal Scope
Page 13 OCR 0.902
(SP BRM Kemajuan Eksplorasi Terhadap Kegiatan Triwulan Sebelumnya Exploration Progress toward Previous Guarters Activities Pada periode ini, PT LMR dalam proses penyelesaian Dokumen ANDAL dan RKL-RPL During this period, PT LMR was in the process of finalizing the ANDAL and RKL-RPL Documents. Rencana Selanjutnya Next Plan Melanjutkan penyelesaian studi AMDAL sampai ke tahap Operasi Produksi. Continue the completion of AMDAL study up to the Operation Production Phase. Hambatan Eksplorasi Barriers to Exploration 1. Adanya tumpang tindih dengan pihak ketiga (IUP-HHK Tusam Hutan Lestari) 2. Adanya kegiatan Penambangan Tanpa Izin (PETI) di Prospek Bulan. 1. There is overlap with the third party (IUP-HAK Tusam Hutan Lestari) 2 There are Illegal Mining (PETI) activities in Bulan Prospect. Perizinan/Persetujuan Baru Yang Diperoleh New Permits/Approvals Acguired 1. PT LMR telah mendapatkan Persetujuan Teknis Pemenuhan Baku Mutu Air Limbah yang Dibuang ke Badan Air Permukaan dari Direktur Jenderal Pengendalian Pencemaran dan Kerusakan Lingkungan sesuai surat Nomor: S.41W/PPKL/PDA/PKL.2/5/2023 tanggal 29 Mei 2023. 2. PT LMR telah mendapatkan Persetujuan Rencana Kerja dan Anggaran Biaya Tahun 2023 dari Direktur Jenderal Mineral dan Batubara sesuai surat Nomor: T- 1269/MB.04/DJB.M/2023 tanggal 31 Mei 2023. 3. PT LMR telah mendapatkan Persetujuan Perpanjangan Suspensi dari Direktur Jenderal Mineral dan Batubara sesuai surat Nomor: T-1390/MB.04/DJB.M/2023 tanggal 23 Juni 2023. 1. PT LMR has obtained the Technical Approval for Compliance with Guality Standards for Wastewater Discharged into Surface Water Bodies from the Director General for Pollution Control — and Environmental — Damage according to letter Number: S410/PPKL/PDAVPKL.2/5/2023 dated 29 May 2023. 2. PT LMR has obtained approval for the 2023 Work Plan and Budget from the Director General of Minerals and Coal according to letter Number: T-1264/MB.04/DJB.M/2023 dated 31 May 2023. 3. PT LMR has obtained Suspension Extension Approval from the Director General of Minerals and Coal according to letter Number, T-1390/MB.04/DJB.M/2023 dated 23 June 2023.
Page 14 OCR 0.912
(SP BRM V. PT Suma Heksa Sinergi Nama Perusahaan (Name of Company Tahap Kegiatan IUP (Phase of Activity of Mining Permity Laporan Eksplorasi Periode (Period of Exploration Report) PT Suma Heksa Sinergi (“PT SHS") Operasi Produksi (Production Operation Phase) April - Juni (April - June) 2023 A. | Daerah Eksplorasi Exploration Areas 1. Prospek Cisadang Central 2. Prospek Cisadang West 3. Prospek Leuwikopo 1. Cisadang Central Prospect 2. Cisadang West Prospect 3. Leuwikopo Prospect B. | Biaya Eksplorasi Exploration Cost 3.922.620.427 Rupiah 1DR3.922.620.-427 C. | Bentuk Kegiatan Eksplorasi Form of Exploration Activities 1. Melakukan pemetaan topografi LiDAR seluas 7.291 Ha pada seluruh prospek dalam Wilayah PT SHS. 1 Conducting LIDAR topographical mapping of Z291 Ha in all prospects within PT SHS area. 2. Melanjutkan perbaikan infrastruktur | 2 Continuing the restoration of supporting pendukung antara lain mess karyawan dan Infrastructure, Indluding employee mess and gudang core shed. core shed warehouse. 3. Memulai kegiatan pemetaan geologi di | 3. Starting geological mapping activities in the Prospek Cisadang Central, Cisadang West, Cisadang Central, Cisadang West, and dan Leuwikopo Leuwikapo prospects. 4. Melakukan kegiatan rekonstruksi core| 4 Conducting core drilling — reconstruction pengeboran. activities. 5. Penyusunan laporan pengelolaan dan | 5. Preparation of environmental management pemantauan lingkungan Semester | 2023. and monitoring reports for the first semester Of 2023. 6. Penyusunan Rencana Induk Program | & Preparation of a Master Plan for Community Pengembangan dan Pemberdayaan Development and Empowerment Programs Masyarakat (RIPPM) (RIPPM) 7. Pengajuan area IPPKH untuk eksplorasi | 7 Submission of IPPKH area for further lanjutan exploration. D. | Pihak-Pihak yang Terlibat Involved Parties PT Tigenco Graha Persada PT Tigenco Graha Persada E. | Metode Pengujian dan Pemilihan Areal Testing Method and Selection of Area
Page 15 OCR 0.888
(PP BRM Kemajuan Eksplorasi Terhadap Kegiatan Triwulan Sebelumnya Exploration Progress toward Previous Guarter's Activities 1 3. Pemetaan — topografi LIDAR telah diselesaikan seluas 7.291 Ha pada seluruh prospek dalam wilayah PT SHS Kegiatan rekontruksi core pemboran telah diselesaikan sebanyak 80 lubang bor Penambahan mess karyawan 1. LIDAR topographical mapping has been completed covering an area of 7,291 Ha in all prospects within the PT SHS area. 2. Drilling core reconstruction activities have been completed in 80 drill holes. 3. Addition of employee's mess. Rencana Selanjutnya Next Plan 1. Melanjutkan pemetaan geologi di Prospek Cisadang — Central, — Cisadang — West, Leuwikopo, dan Gunung Batu Melakukan kegiatan pengeboran untuk studi metalurgi, geoteknik, dan geohidrologi di Prospek Cisadang Central 1. Continuing geological mapping at Cisadang Central, Cisadang West, Leuwikopo, and Gunung Batu Prospects. 2. Conducting drilling activities for metallurgy, geotechnical, and geohyarology studies at the Cisadang Central and Cisadang West dan Cisadang West Prospects. Hambatan Eksplorasi Barriers to Exploration Perizinan/Persetujuan Baru Yang Diperoleh New Permits/Approvals Acguired
Names mentioned 0 people and organisations named in the text · linked when the evidence is strong
The name pass has not read this document yet.
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
No extraction attempted yet.