Skip to content
Back to announcement

20230704_NSSS_Laporan Penggunaan Dana Hasil Penawaran Umum_31336454.pdf

Other Text extracted NSSS

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 14

Page 1
Go To English Page

 Nomor Surat                              070/NSS/SK/VII/2023

 Nama Perusahaan                          PT Nusantara Sawit Sejahtera Tbk

 Kode Emiten                              NSSS

 Lampiran                                 2

 Perihal                                  Laporan Penggunaan Dana Hasil Penawaran Umum


Dana yang diperoleh dari Penawaran Umum IDR

                                                                                       Rencana      Realisasi
                                                Jumlah
                                                               Biaya        Hasil     Penggunaa Penggunaa
                                                  Hasil
  Jenis                                                     Penawaran Realisasi         n Dana       n Dana     Sisa Dana
                               Tanggal         Penawaran
Penawaran Nama Emisi                                          Umum         Bersih      Menurut      Menurut      (satuan
                                Efektif          Umum
  Umum                                                     (satuan mata (satuan       Prospektus Prospektus mata uang)
                                                (satuan
                                                               uang)     mata uang)     (satuan      (satuan
                                               mata uang)
                                                                                      mata uang) mata uang)
                               10 Maret       453.165.883. 22.652.110.4 430.513.772. 430.513.772. 163.419.861. 267.093.910
IPO Saham            NSSS
                                 2023             100           64          636           636          932         .704

Penempatan Sisa Dana

     Jenis
                      Kode Nama
   Penawaran                                                             Penempatan List
                         Efek
     Umum
                                       Sisa Dana                                                            Hubungan
                                                   Tingkat Bunga/                          Jangka Waktu
                                     (satuan mata                   Penempatan                               dengan
                                                      Bagi Hasil                           Penyimpanan
                                         uang)                                                             Perusahaan
  IPO Saham             NSSS        253.785.293.32
                                                       0,5       % Rekening Giro                0           pihak Tiga
                                           8
                                    13.308.617.376          2,25     %      Deposito         1 bulan        pihak Tiga
Page 2
Rincian Rencana Penawaran Umum

    Jenis
               Kode Nama
  Penawaran                 Tanggal Efektif   Rencana List
                  Efek
    Umum
Page 3
  Jenis
            Kode Nama
Penawaran               Tanggal Efektif                        Rencana List
               Efek
  Umum
                                              Hasil
                                            Realisasi                     Jumlah
                                             Bersih       Uraian       (satuan mata    Persentase
                                          (satuan mata                     uang)
                                              uang)
                                                     PT. Borneo Sawit
                                                     Perdana - untuk
                                                     kebutuhan biaya
                                                           belanja
                                                        modal/capital
                                      430.513.772.63                    128.293.104.24 29,7999992
                                                         expenditure                              %
                                            6                                  6        37060547
                                                       (CAPEX) BSP
                                                            dalam
                                                        membangun
                                                       fasilitas pabrik
                                                        kelapa sawit
                                                     PT. Borneo Sawit
                                                     Perdana - untuk
                                                     kebutuhan biaya
                                                           belanja
                                                        modal/capital
                                      430.513.772.63                                   3,20000004
                                                         expenditure    13.776.440.724            %
                                            6                                            7683716
                                                       (CAPEX) BSP
                                                            dalam
                                                        membangun
                                                       pembangunan
                                                      terminal khusus
                                                     PT. Borneo Sawit
                                                     Perdana - untuk
                                                         pemenuhan
IPO Saham     NSSS      10 Maret 2023                modal kerja BSP
                                      430.513.772.63                                   9,39999961
                                                     dalam pembelian 40.468.294.628               %
                                            6                                            8530273
                                                          pupuk dan
                                                        agrochemical
                                                     atau bahan kimia
                                                          pertanian
                                                     PT. Bina Sarana
                                                       Sawit Utama -
                                                             untuk
                                      430.513.772.63                                   15,6999998
                                                        melanjutkan 67.590.662.304                %
                                            6                                           09265137
                                                           proses
                                                        pembebasan
                                                             lahan
                                                     PT. Bina Sarana
                                                       Sawit Utama -
                                                             untuk
                                      430.513.772.63 pembiayaan
                                                                        32.288.532.948     7,5    %
                                            6              proses
                                                         pembibitan
                                                     tanaman kelapa
                                                             sawit
                                                     PT. Bina Sarana
                                                       Sawit Utama -
                                                             untuk
                                      430.513.772.63                    102.462.277.88 23,7999992
                                                     pembiayaan dan                               %
                                            6                                  7        37060547
                                                         pemupukan
                                                     tanaman selama
                                                        periode TBM
Page 4
  Jenis
            Kode Nama
Penawaran               Tanggal Efektif                          Rencana List
               Efek
  Umum
                                               Hasil
                                             Realisasi                      Jumlah
                                              Bersih         Uraian      (satuan mata    Persentase
                                           (satuan mata                      uang)
                                               uang)
                                                           PT. Prasetya
                                                           Mitra Muda -
                                                               untuk
                                                            pemenuhan
                                          430.513.772.63 modal kerja PMM                 10,6000003
                                                                          45.634.459.899            %
                                                6        dalam pembelian                  81469727
                                                             pupuk dan
                                                           agrochemical
                                                         atau bahan kimia
                                                             pertanian
Page 5
Rincian Realisasi Penawaran Umum

    Jenis
                Kode Nama
  Penawaran                   Tanggal Efektif                        Realisasi List
                   Efek
    Umum
                                                    Hasil
                                                  Realisasi                      Jumlah
                                                   Bersih       Uraian        (satuan mata   Persentase
                                                (satuan mata                      uang)
                                                    uang)
                                                           PT. Borneo Sawit
                                                           Perdana - untuk
                                                           kebutuhan biaya
                                                                belanja
                                                             modal/capital
                                            430.513.772.63                                  20,447000
                                                              expenditure    88.025.932.353             %
                                                  6                                          50354004
                                                            (CAPEX) BSP
                                                                 dalam
                                                             membangun
                                                            fasilitas pabrik
                                                             kelapa sawit
                                                           PT. Borneo Sawit
                                                           Perdana - untuk
                                                              pemenuhan
                                                           modal kerja BSP
                                            430.513.772.63                                  9,3999996
                                                           dalam pembelian 40.468.294.628               %
  IPO Saham        NSSS       10 Maret 2023       6                                          18530273
                                                               pupuk dan
                                                             agrochemical
                                                           atau bahan kimia
                                                               pertanian
                                                           PT. Bina Sarana
                                                            Sawit Utama -
                                                                  untuk                     0,1400000
                                            430.513.772.63
                                                              melanjutkan     602.770.000 005960464     %
                                                  6
                                                                proses                          5
                                                             pembebasan
                                                                  lahan
                                                             PT. Prasetya
                                                             Mitra Muda -
                                                                  untuk
                                                              pemenuhan
                                            430.513.772.63 modal kerja PMM                  7,9730000
                                                                             34.322.864.951             %
                                                  6        dalam pembelian                  495910645
                                                               pupuk dan
                                                             agrochemical
                                                           atau bahan kimia
                                                               pertanian
Page 6
Rincian Biaya Penawaran Umum

   Jenis                                             Jumlah                                   Jumlah
                                     Tanggal                                                            Persenta
 Penawaran        Kode Efek                           Hasil              Uraian            (Satuan Mata
                                      Efektif                                                              se
   Umum                                             Penawaran                                  Uang)
 IPO Saham          NSSS           10 Maret 2023 453.165.883.10a. biaya jasa penjaminan
                                                       0       (underwriting fee);
                                                                                           3.429.141.732   0,76    %


                                                                b. biaya jasa
                                                                penyelenggaraan
                                                                                           6.797.488.247   1,5     %
                                                                (management fee);

                                                                c. biaya jasa penjualan
                                                                (selling fee);
                                                                                           3.368.346.514   0,74    %


                                                                d. biaya jasa profesi
                                                                penunjang pasar modal;
                                                                                           4.372.000.000   0,96    %


                                                                e. biaya jasa lembaga
                                                                penunjang pasar modal;
                                                                                           120.000.000     0,03    %
                                                                dan

                                                                f. biaya jasa konsultasi
                                                                keuangan (financial
                                                                                           2.410.829.416   0,53    %
                                                                advisory fee).

                                                                g. Biaya lain-lain yang
                                                                dapat diatribusikan
                                                                                           2.154.304.555   0,48    %
                                                                langsung sebagai biaya
                                                                emisi***)

Demikian untuk diketahui.


Hormat Kami,
PT Nusantara Sawit Sejahtera Tbk




Teguh Patriawan

Direktur Utama




PT Nusantara Sawit Sejahtera Tbk
Menara Imperium LT20, Suite C
Telepon : (+62 21) 8354 045, Fax : (+62 21) 8317 688, www.nssgroup.id



Nama Pengirim                      Teguh Patriawan

Jabatan                            Direktur Utama
Tanggal dan Waktu                  07-07-2023 17:45
Page 7
Lampiran                        1. Surat Pengantar LRPD NSS per 30 Juni 2023.pdf


                                2. Lampiran LRPD NSSS per 30 Juni 2023.pdf


 Dokumen ini merupakan dokumen resmi PT Nusantara Sawit Sejahtera Tbk yang tidak memerlukan tanda tangan
     karena dihasilkan secara elektronik oleh sistem pelaporan elektronik. PT Nusantara Sawit Sejahtera Tbk
                   bertanggung jawab penuh atas informasi yang tertera didalam dokumen ini.
Page 8
Go To Indonesian Page

 Announcement Number                     070/NSS/SK/VII/2023

 Issuer Name                             PT Nusantara Sawit Sejahtera Tbk

 Issuer Code                             NSSS

 Attachment                              2

 Subject                                 Laporan Penggunaan Dana Hasil Penawaran Umum


Fund received form the public offering            IDR


                                        Amount of                                Plan for use Realized
                                         Proceed      Cost of                     of proceed Use of Fund
   Type of                                                             Net                                  Remaining
                Name of                  from the      Public                   according to according to
    public                 Listing Date                            Realization                               Fund (in
                Issuance                   Public    Offering (in                     the          the
   offering                                                       (in Currency)                             Currency)
                                        Offering (in Currency)                   Prospectus Prospectus
                                        Currency)                               (in Currency) (in Currency)

                                             453,165,883, 22,652,110,4 430,513,772, 430,513,772, 163,419,861, 267,093,910
IPO Saham         NSSS
                                                 100           64          636          636          932          ,704


Allocation of Remaining Fund


 Type of public Name / Code of
                                                                        List of allocation
    offering      Securities

                                  Remaining Fund Interest/Yield                                                 Relationship with
                                                                           Allocation        Retention Period
                                   (in Currency)      Rate                                                       the company
  IPO Saham             NSSS      253,785,293,32
                                                            0.5     %   Rekening Giro               0              pihak Tiga
                                        8
                                  13,308,617,376           2.25     %      Deposito              1 bulan           pihak Tiga
Page 9
Details of Public Offering Plan


 Type of public Name / Code of
                                  Listing date   List of plans
    offering      Securities
Page 10
Type of public Name / Code of
                                Listing date                            List of plans
   offering      Securities



                                               Net Realization                    Amount (in
                                                                 Description                    Percentage
                                                (in Currency)                     Currency)


                                                              PT. Borneo Sawit
                                                              Perdana - untuk
                                                              kebutuhan biaya
                                                                    belanja
                                                                 modal/capital
                                               430,513,772,63                    128,293,104,24 29.7999992
                                                                  expenditure                              %
                                                     6                                  6        37060547
                                                                (CAPEX) BSP
                                                                     dalam
                                                                 membangun
                                                                fasilitas pabrik
                                                                 kelapa sawit
                                                              PT. Borneo Sawit
                                                              Perdana - untuk
                                                              kebutuhan biaya
                                                                    belanja
                                                                 modal/capital
                                               430,513,772,63                                   3.20000004
                                                                  expenditure    13,776,440,724            %
                                                     6                                            7683716
                                                                (CAPEX) BSP
                                                                     dalam
                                                                 membangun
                                                                pembangunan
                                                               terminal khusus
                                                              PT. Borneo Sawit
                                                              Perdana - untuk
                                                                  pemenuhan
 IPO Saham         NSSS                                       modal kerja BSP
                                               430,513,772,63                                   9.39999961
                                                              dalam pembelian 40,468,294,628               %
                                                     6                                            8530273
                                                                   pupuk dan
                                                                 agrochemical
                                                              atau bahan kimia
                                                                   pertanian
                                                              PT. Bina Sarana
                                                                Sawit Utama -
                                                                      untuk
                                               430,513,772,63                                   15.6999998
                                                                 melanjutkan 67,590,662,304                %
                                                     6                                           09265137
                                                                    proses
                                                                 pembebasan
                                                                      lahan
                                                              PT. Bina Sarana
                                                                Sawit Utama -
                                                                      untuk
                                               430,513,772,63 pembiayaan
                                                                                 32,288,532,948     7.5    %
                                                     6              proses
                                                                  pembibitan
                                                              tanaman kelapa
                                                                      sawit
                                                              PT. Bina Sarana
                                                                Sawit Utama -
                                                                      untuk
                                               430,513,772,63                    102,462,277,88 23.7999992
                                                              pembiayaan dan                               %
                                                     6                                  7        37060547
                                                                  pemupukan
                                                              tanaman selama
                                                                 periode TBM
Page 11
Type of public Name / Code of
                                Listing date                            List of plans
   offering      Securities



                                               Net Realization                    Amount (in
                                                                 Description                   Percentage
                                                (in Currency)                     Currency)


                                                                PT. Prasetya
                                                                Mitra Muda -
                                                                    untuk
                                                                 pemenuhan
                                               430,513,772,63 modal kerja PMM                 10.6000003
                                                                               45,634,459,899            %
                                                     6        dalam pembelian                  81469727
                                                                  pupuk dan
                                                                agrochemical
                                                              atau bahan kimia
                                                                  pertanian
Page 12
Details of Public Offering Realization


 Type of Public Name / Code of
                                     Listing Date                          Realization Plan
    Offering      Securities



                                                    Net Realization                   Amount (in
                                                                      Description                   Percentage
                                                     (in Currency)                    Currency)


                                                                   PT. Borneo Sawit
                                                                   Perdana - untuk
                                                                   kebutuhan biaya
                                                                        belanja
                                                                     modal/capital
                                                    430,513,772,63                                  20.4470005
                                                                      expenditure    88,025,932,353            %
                                                          6                                           0354004
                                                                    (CAPEX) BSP
                                                                         dalam
                                                                     membangun
                                                                    fasilitas pabrik
                                                                     kelapa sawit
                                                                   PT. Borneo Sawit
                                                                   Perdana - untuk
                                                                      pemenuhan
                                                                   modal kerja BSP
                                                    430,513,772,63                                  9.39999961
  IPO Saham            NSSS                                        dalam pembelian 40,468,294,628              %
                                                          6                                           8530273
                                                                       pupuk dan
                                                                     agrochemical
                                                                   atau bahan kimia
                                                                       pertanian
                                                                   PT. Bina Sarana
                                                                    Sawit Utama -
                                                                          untuk
                                                    430,513,772,63                                  0.14000000
                                                                      melanjutkan     602,770,000              %
                                                          6                                         059604645
                                                                        proses
                                                                     pembebasan
                                                                          lahan
                                                                     PT. Prasetya
                                                                     Mitra Muda -
                                                                          untuk
                                                                      pemenuhan
                                                    430,513,772,63 modal kerja PMM                  7.97300004
                                                                                     34,322,864,951            %
                                                          6        dalam pembelian                   95910645
                                                                       pupuk dan
                                                                     agrochemical
                                                                   atau bahan kimia
                                                                       pertanian
Page 13
Details of Cost of Public Offering

                                                      Amount of
Type of Public                                                                                  Amount (in   Percenta
                  Securities Code    Listing Date   Proceed for the     Description
   Offering                                                                                     Currency)       ge
                                                    Public Offering
  IPO Saham            NSSS                         453,165,883,10a. Underwriting fee
                                                           0
                                                                                               3,429,141,732 0.76       %


                                                                  b. Management fee
                                                                                               6,797,488,247 1.5        %


                                                                  c. Selling fee
                                                                                               3,368,346,514 0.74       %


                                                                  d. Capital Market
                                                                  Supporting Profession
                                                                                               4,372,000,000 0.96       %
                                                                  fee

                                                                  e. Capital Market
                                                                  Supporting Institution fee
                                                                                               120,000,000 0.03         %


                                                                  f. Financial advisory fee
                                                                                               2,410,829,416 0.53       %


                                                                  g. Other fees which can
                                                                  be directly attributed as
                                                                                            2,154,304,555 0.48          %
                                                                  securities issuance fees


Thus to be informed accordingly.


 Respectfully,
 PT Nusantara Sawit Sejahtera Tbk




 Teguh Patriawan

 Direktur Utama




 PT Nusantara Sawit Sejahtera Tbk
 Menara Imperium LT20, Suite C
 Phone : (+62 21) 8354 045, Fax : (+62 21) 8317 688, www.nssgroup.id



 Sender Name                         Teguh Patriawan

 Function                            Direktur Utama

 Date and Time                       07-07-2023 17:45
Page 14
Attachment                        1. Surat Pengantar LRPD NSS per 30 Juni 2023.pdf


                                  2. Lampiran LRPD NSSS per 30 Juni 2023.pdf


   This is an official document of PT Nusantara Sawit Sejahtera Tbk that does not require a signature as it was
 generated electronically by the electronic reporting system. PT Nusantara Sawit Sejahtera Tbk is fully responsible
                                 for the information contained within this document.

File

File Open PDF
Source IDX
Size0.03 MB
Published7 Jul 2023
Pages14
Characters35,469
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 0 people and organisations named in the text · linked when the evidence is strong

The name pass has not read this document yet.

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result