Skip to content
Back to announcement

20260929_GTBO_Laporan Informasi dan Fakta Material_32161915_lamp1.pdf

Other Text extracted GTBO

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 1

Page 1 OCR 0.935
PT GARDA TUJUH BUANA Tbk

Coal Mining and Mining Services

Jakarta, 29 Juni 2026
No.: 038/GTB-JKT/IX/2026

Kepada Yth:

Otoritas Jasa Keuangan

Gedung Soemitro Djojohadikusumo
Jalan Lapangan Banteng Timur No.2-4
Jakarta 10710

U.p: Yth. Kepala Eksekutif Pengawas Pasar Modal
Perihal: Keterbukaan Informasi : RKAB
Dengan hormat,

PT Garda Tujuh Buana Tbk. (“GTBO”) menyampaikan
beberapa perkembangan terkait Perusahaan sebagai
berikut:

1. Rercana Kerja dan Anggaran Biaya (RKAB) telah
disetujui oleh Kementerian Energi dan Sumber Daya
Mineral Republik Indonesia, Direktoran Jenderal
Mineral dan Batubara dengan Surat Nomor: T-
247.RKAB/MB.05/DJB.B/2026 tanggal 25 September
2026,

2. Produksi Batubara GTBO tahun 2026 diberikan
maksimal 817.900 ton:

3. GTBO akan mulai produksi kembali pada minggu ke-1
atau ke-2 bulan Oktober.2026,

4. Estimasi produksi Batubara GTBO sampai dengan
Desember 2026 sebesar 400.000-500.000 ton,

5.  GTBO memiliki 3 kontrak penjualan Batubara yaitu 2
kontak jangka panjang dan 1 kontrak jangka pendek,

6. GTBO berencana memenuhi kepatuhan Domestic
Market Obligation (DMO) sebesar 2596 dengan
melakukan penjualan domestik.

Atas perhatian dan kerjasamanya diucapkan terima kasih.

Kepada Yth:

Direktur Bursa Efek Indonesia
Gedung Bursa Efek Indonesia Tower I
JL Jend. Sudirman Kav. 51-53
Jakarta 12190

U.p: Yth. Direktur Penilaian Perusahaan

PT Garda Tujuh Buana Tbk. (“GTBO”) shares some
Updates related to the Company as follows:

The Ministry of Energy and Mineral Resources of the
Republic of Indonesia, Directorate Generalof Minerals and
Coal, approved the Work Plan and Budget (RKAB) with
Letter Number: T-2247.RKAB/MB.05/DJB.B/2026 dated
September 25, 2026.

The authorities set the cap for GTBO coal production at
817,900 tons in 2026.

GTBO will start production again in the 1" or 2"4 week of
October 2026:

The estimated GTBO coal production until December
2026 is around 400,000-500,000 tons,

GTBO has 3 coal sales contracts, which are 2 long-term
contracts and 1 short-term contract,

GTBO plans to meet the 2546 Domestic Market Obligation
(DMO) compliance by making domestic sales.

Hormat kami / With regards,

Yanry Musa
Direktur

Jakarta Office: Gd. Permata Kuningan Lantai 8, Jalan Kuningan Mulia Kav. 9C,
Guntur, Setiabudi, Jakarta Selatan 12980, Indonesia, (021) 3970 6652
Site Office: Mining Site PT. Garda Tujuh Buana, Tbk. Sei Tapa Pulau Bunyu, Bulungan, Kalimantan Utara

File

File Open PDF
Source IDX
Size0.07 MB
Published29 Sep 2026
Pages1
Characters2,432
Text sourceOCR
OCR confidence0.935

Names mentioned 0 people and organisations named in the text · linked when the evidence is strong

The name pass has not read this document yet.

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

Other files in this announcement 1

↑↓ select ↵ open ⇧↵ see every result