Skip to content
Back to announcement

20260929_TBIG_Penyampaian Prospektus//Informasi Tambahan_32161920.pdf

Other Text extracted TBIG

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 2

Page 1
Go To English Page

 Nomor Surat                       6727/TBIG-TBI-00/CSI/05/IX/2026

 Nama Perusahaan                   PT Tower Bersama Infrastructure Tbk

 Kode Emiten                       TBIG

 Lampiran                          2

 Perihal                           Penyampaian Prospektus

Sehubungan dengan Penawaran Umum Perdana, perseroan menyampaikan Prospektus dan/atau Term Sheet yang
telah mendapatkan persetujuan dari Otoritas Jasa Keuangan sebagaimana terlampir.


Informasi Lain

Penyampaian Informasi Tambahan Ringkas Dalam Rangka Penawaran Umum Berkelanjutan Obligasi Berkelanjutan VII
Tower Bersama Infrastructure Tahap V Tahun 2026 dan Sukuk Ijarah Berkelanjutan I Tower Bersama Infrastructure
Tahap V Tahun 2026



 Demikian untuk diketahui.


 Hormat Kami,
 PT Tower Bersama Infrastructure Tbk




 Helmy Yusman Santoso

 CFO/ Corporate Secretary




 PT Tower Bersama Infrastructure Tbk
 Gedung The Convergence Indonesia, Lt. 11, Kaw. Rasuna Epicentrum, Jl. HR.
 Telepon : +62 21 2924 8900, Fax : +62 21 2157 2015, https://www.tower-bersama.



 Nama Pengirim                     Helmy Yusman Santoso

 Jabatan                           CFO/ Corporate Secretary
 Tanggal dan Waktu                 29-09-2026 20:22

 Lampiran                         1. 6727 29Sept26 Pengantar InTam Ringkas.pdf


                                  2. TBIG 7.5 - Intam Ringkas 29092026.pdf


 Dokumen ini merupakan dokumen resmi PT Tower Bersama Infrastructure Tbk yang tidak memerlukan tanda tangan
     karena dihasilkan secara elektronik oleh sistem pelaporan elektronik. PT Tower Bersama Infrastructure Tbk
                     bertanggung jawab penuh atas informasi yang tertera didalam dokumen ini.
Page 2
Go To Indonesian Page

 Letter / Announcement No.           6727/TBIG-TBI-00/CSI/05/IX/2026

 Issuer Name                         PT Tower Bersama Infrastructure Tbk

 Issuer Code                         TBIG

 Attachment                          2

 Subject                             Penyampaian Prospektus

In accordance with the Initial Public Offering, The Issuer had submitted the Company's Prospectus and/or Term Sheet
that has been approved by the Indonesia Financial Service Authority, as attached.


Other Information:

Submission of Brief Additional Information in the context of the Continuous Public Offering of Continuous Bonds VII
Tower Bersama Infrastructure Phase V 2026 and Continuous Sukuk Ijarah I Tower Bersama Infrastructure Phase V
2026.



Thus to be informed accordingly.


Respectfully,
PT Tower Bersama Infrastructure Tbk




Helmy Yusman Santoso

CFO/ Corporate Secretary




PT Tower Bersama Infrastructure Tbk
Gedung The Convergence Indonesia, Lt. 11, Kaw. Rasuna Epicentrum, Jl. HR.
Phone : +62 21 2924 8900, Fax : +62 21 2157 2015, https://www.tower-bersama.com



Sender Name                          Helmy Yusman Santoso

Function                             CFO/ Corporate Secretary

Date and Time                        29-09-2026 20:22

Attachment                          1. 6727 29Sept26 Pengantar InTam Ringkas.pdf


                                    2. TBIG 7.5 - Intam Ringkas 29092026.pdf


    This is an official document of PT Tower Bersama Infrastructure Tbk that does not require a signature as it was
       generated electronically by the electronic reporting system. PT Tower Bersama Infrastructure Tbk is fully
                             responsible for the information contained within this document.

File

File Open PDF
Source IDX
Size0.01 MB
Published29 Sep 2026
Pages2
Characters3,472
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 0 people and organisations named in the text · linked when the evidence is strong

The name pass has not read this document yet.

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result