Skip to content
Back to announcement

20261005_MANG_Laporan Penggunaan Dana Hasil Penawaran Umum_32163285.pdf

Other Text extracted MANG

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 8

Page 1
Go To English Page

 Nomor Surat                      379/CORSEC-MPR/X/2026

 Nama Perusahaan                  PT Manggung Polahraya Tbk

 Kode Emiten                      MANG

 Lampiran                         1

 Perihal                          Laporan Penggunaan Dana Hasil Penawaran Umum

Mengoreksi surat kami nomor : 266/CORSEC-MPR/VII/2026 tanggal 16 Juli 2026 perihal Laporan Penggunaan Dana
Hasil Penawaran Umum, dengan ini perseroan menyampaikan hal sebagai berikut:

Dana yang diperoleh dari Penawaran Umum IDR

                                                                         Rencana      Realisasi
                                   Jumlah
                                                 Biaya        Hasil     Penggunaa Penggunaa
                                     Hasil
   Jenis                                      Penawaran Realisasi         n Dana       n Dana    Sisa Dana
                      Tanggal    Penawaran
Penawaran Nama Emisi                            Umum         Bersih      Menurut      Menurut     (satuan
                       Efektif      Umum
  Umum                                       (satuan mata (satuan       Prospektus Prospektus mata uang)
                                   (satuan
                                                 uang)     mata uang)     (satuan      (satuan
                                 mata uang)
                                                                        mata uang) mata uang)
                     11 Januari 76.250.000.0 2.859.618.25 73.390.381.7 73.390.381.7 73.390.381.7
IPO Saham   MANG                                                                                     0
                       2024           00           2           48            48           48

Penempatan Sisa Dana

     Jenis
                     Kode Nama
   Penawaran                                                     Penempatan List
                        Efek
     Umum
                                   Sisa Dana                                                       Hubungan
                                                Tingkat Bunga/                     Jangka Waktu
                                 (satuan mata                     Penempatan                        dengan
                                                   Bagi Hasil                      Penyimpanan
  IPO Saham           MANG           uang)                                                        Perusahaan
                                      0             0      %           0                0         pihak Tiga
Page 2
Rincian Rencana Penawaran Umum

    Jenis
               Kode Nama
  Penawaran                 Tanggal Efektif                          Rencana List
                  Efek
    Umum
                                                  Hasil
                                                Realisasi                        Jumlah
                                                 Bersih         Uraian        (satuan mata     Persentase
                                              (satuan mata                        uang)
                                                  uang)
                                                               100% untuk
                                                               modal kerja
                                                            antara lain biaya
                                                           pokok Konstruksi
                                                               Gedung dan
                                                                Bangunan,
                                                             Pembangunan
                                                               Infrastruktur
                                                            Jalan, Produksi
                                                              Aspal Hot Mix
                                                              dan Produksi
                                                              Beton Ready
  IPO Saham       MANG      11 Januari 2024                   Mix, Gaji dan
                                                                Tunjangan
                                                                (100% for
                                            73.390.381.748                    73.390.381.748    100     %
                                                            working capital,
                                                           including, among
                                                              others, direct
                                                           costs for building
                                                              and structure
                                                              construction,
                                                                   road
                                                              infrastructure
                                                              development,
                                                             hot-mix asphalt
                                                             and ready-mix
                                                                 concrete
                                                             production, as
                                                             well as salaries
                                                            and allowances)
Page 3
Rincian Realisasi Penawaran Umum

    Jenis
                Kode Nama
  Penawaran                    Tanggal Efektif                              Realisasi List
                   Efek
    Umum
                                                      Hasil
                                                    Realisasi                            Jumlah
                                                     Bersih            Uraian         (satuan mata       Persentase
                                                  (satuan mata                            uang)
                                                      uang)
                                                                 Konstruksi
                                                                Gedung dan
                                                                                             7,6199998
                                               73.390.381.748    Bangunan      5.591.143.120           %
                                                                                              85559082
                                                                  (Building
  IPO Saham        MANG        11 Januari 2024                  Construction)
                                                               Produksi Aspal
                                                                   Beton
                                                                                             1,8799999
                                               73.390.381.748 (Production of 1.382.997.200             %
                                                                                             952316284
                                                                Asphalt and
                                                                  Concrete)
                                                                 Uang Muka
                                               73.390.381.748                 66.416.241.428    90,5   %
                                                              (Down Payment)
                                                 73.390.381.748         Total       73.390.381.748        100        %


Rincian Biaya Penawaran Umum

    Jenis                                           Jumlah                                      Jumlah
                                    Tanggal                                                               Persenta
  Penawaran       Kode Efek                          Hasil                 Uraian            (Satuan Mata
                                     Efektif                                                                 se
    Umum                                           Penawaran                                     Uang)
 IPO Saham         MANG         11 Januari 202476.250.000.000a. biaya jasa penjaminan
                                                             (underwriting fee);
                                                                                             912.500.000        31,91    %


                                                                  b. biaya jasa
                                                                  penyelenggaraan
                                                                                                     0           0       %
                                                                  (management fee);

                                                                  c. biaya jasa penjualan
                                                                  (selling fee);
                                                                                                     0           0       %


                                                                  d. biaya jasa profesi
                                                                  penunjang pasar modal;
                                                                                             1.449.523.615      50,69    %


                                                                  e. biaya jasa lembaga
                                                                  penunjang pasar modal;
                                                                                             152.600.000        5,34     %
                                                                  dan

                                                                  f. biaya jasa konsultasi
                                                                  keuangan (financial
                                                                                                     0           0       %
                                                                  advisory fee).

                                                                  g. Biaya lain-lain yang
                                                                  dapat diatribusikan
                                                                                             344.994.637        12,06    %
                                                                  langsung sebagai biaya
                                                                  emisi***)
Page 4
Dana yang diperoleh dari Konversi Waran dan Konversi efek Lainnya

                                                                                    Rencana Realisasi
                                                                          Jumlah
                                                                                    Pengguna Pengguna
                                         Total efek                      Efek yang                      Sisa Dana
                             Tanggal                                                 an Dana an Dana
 No Jenis Efek Kode Efek                    yang       Harga     Nilai     belum                           Hasil
                            Penerbitan                                               Menurut Menurut
                                         diterbitkan                     dikonversi                      Konversi
                                                                                    Prospektu Prospektu
                                                                            kan
                                                                                        s         s
                            11 Januari 228.750.0               28.593.75 228.646.1 12.981.87           12.981.87
 1     Waran     MANG-W                                125                                       0
                              2024        00                     0.000      45         5                   5

Demikian untuk diketahui.


Hormat Kami,
PT Manggung Polahraya Tbk




Mohamad Raviali

Direktur Utama




PT Manggung Polahraya Tbk
Kantor Pusat:
Telepon : (021) 765 1344, Fax : , www.manggungpolahraya.co.id



Nama Pengirim                       Mohamad Raviali

Jabatan                             Direktur Utama
Tanggal dan Waktu                   05-10-2026 17:33

Lampiran                           1. LRPD Per 30 Juni 2026 (Koreksi).pdf


 Dokumen ini merupakan dokumen resmi PT Manggung Polahraya Tbk yang tidak memerlukan tanda tangan karena
   dihasilkan secara elektronik oleh sistem pelaporan elektronik. PT Manggung Polahraya Tbk bertanggung jawab
                               penuh atas informasi yang tertera didalam dokumen ini.
Page 5
Go To Indonesian Page

 Announcement Number                     379/CORSEC-MPR/X/2026

 Issuer Name                             PT Manggung Polahraya Tbk

 Issuer Code                             MANG

 Attachment                              1

 Subject                                 Laporan Penggunaan Dana Hasil Penawaran Umum

Correction to our previous announcement number : 266/CORSEC-MPR/VII/2026 dated 16 July 2026 with the subject of
Laporan Penggunaan Dana Hasil Penawaran Umum, the company hereby submit the following information :

Fund received form the public offering            IDR


                                        Amount of                                Plan for use Realized
                                         Proceed      Cost of                     of proceed Use of Fund
   Type of                                                             Net                                  Remaining
                Name of                  from the      Public                   according to according to
    public                 Listing Date                            Realization                               Fund (in
                Issuance                   Public    Offering (in                     the          the
   offering                                                       (in Currency)                             Currency)
                                        Offering (in Currency)                   Prospectus Prospectus
                                        Currency)                               (in Currency) (in Currency)

                                             76,250,000,0 2,859,618,25 73,390,381,7 73,390,381,7 73,390,381,7
IPO Saham         MANG                                                                                                    0
                                                  00            2           48           48           48


Allocation of Remaining Fund


 Type of public Name / Code of
                                                                        List of allocation
    offering      Securities

                                  Remaining Fund Interest/Yield                                                 Relationship with
                                                                           Allocation        Retention Period
                                   (in Currency)      Rate                                                       the company
  IPO Saham             MANG

                                              0              0      %          0                    0              pihak Tiga
Page 6
Details of Public Offering Plan


 Type of public Name / Code of
                                  Listing date                             List of plans
    offering      Securities



                                                 Net Realization                     Amount (in
                                                                   Description                      Percentage
                                                  (in Currency)                      Currency)


                                                                    100% untuk
                                                                    modal kerja
                                                                 antara lain biaya
                                                                pokok Konstruksi
                                                                    Gedung dan
                                                                     Bangunan,
                                                                  Pembangunan
                                                                    Infrastruktur
                                                                 Jalan, Produksi
                                                                   Aspal Hot Mix
                                                                   dan Produksi
                                                                   Beton Ready
  IPO Saham           MANG                                         Mix, Gaji dan
                                                                     Tunjangan
                                                                     (100% for
                                                 73,390,381,748                    73,390,381,748    100     %
                                                                 working capital,
                                                                including, among
                                                                   others, direct
                                                                costs for building
                                                                   and structure
                                                                   construction,
                                                                        road
                                                                   infrastructure
                                                                   development,
                                                                  hot-mix asphalt
                                                                  and ready-mix
                                                                      concrete
                                                                  production, as
                                                                  well as salaries
                                                                 and allowances)
Page 7
Details of Public Offering Realization


 Type of Public Name / Code of
                                     Listing Date                                  Realization Plan
    Offering      Securities



                                                        Net Realization                        Amount (in
                                                                            Description                          Percentage
                                                         (in Currency)                         Currency)


                                                                          Konstruksi
                                                                         Gedung dan
                                                                                                      7.61999988
                                                        73,390,381,748    Bangunan      5,591,143,120            %
                                                                                                        5559082
                                                                           (Building
  IPO Saham           MANG                                               Construction)
                                                                        Produksi Aspal
                                                                            Beton
                                                                                                      1.87999999
                                                        73,390,381,748 (Production of 1,382,997,200              %
                                                                                                       52316284
                                                                         Asphalt and
                                                                           Concrete)
                                                                          Uang Muka
                                                        73,390,381,748                 66,416,241,428     90.5   %
                                                                       (Down Payment)
                                                        73,390,381,748          Total       73,390,381,748        100        %


Details of Cost of Public Offering

                                                          Amount of
Type of Public                                                                                          Amount (in   Percenta
                  Securities Code        Listing Date   Proceed for the     Description
   Offering                                                                                             Currency)       ge
                                                        Public Offering
  IPO Saham            MANG                             76,250,000,000a. Underwriting fee
                                                                                                       912,500,000 31.91         %


                                                                          b. Management fee
                                                                                                             0       0           %


                                                                          c. Selling fee
                                                                                                             0       0           %


                                                                          d. Capital Market
                                                                          Supporting Profession
                                                                                                       1,449,523,615 50.69       %
                                                                          fee

                                                                          e. Capital Market
                                                                          Supporting Institution fee
                                                                                                       152,600,000 5.34          %


                                                                          f. Financial advisory fee
                                                                                                             0       0           %


                                                                          g. Other fees which can
                                                                          be directly attributed as
                                                                                                       344,994,637 12.06         %
                                                                          securities issuance fees
Page 8
Funds received from warrant conversion and conversion from other securities

                                                                                                           Amount of
                                                                                     Plan of Realized
                                                                        Amount of                            Fund
                                     Total                                         use of fund use of fund
       Type of Securities Issuance                                      Securities                         Remaining
 No                                Securities        Price     Value                according according
      Securities Code       date                                         not yet                            after the
                                    Issued                                            to the     to the
                                                                        converted                          Conversio
                                                                                   prospectus prospectus
                                                                                                                n
                                       228,750,0             28,593,75 228,646,1 12,981,87                12,981,87
  1     Waran     MANG-W                              125                                          0
                                          00                   0,000      45         5                        5

Thus to be informed accordingly.


 Respectfully,
 PT Manggung Polahraya Tbk




 Mohamad Raviali

 Direktur Utama




 PT Manggung Polahraya Tbk
 Kantor Pusat:
 Phone : (021) 765 1344, Fax : , www.manggungpolahraya.co.id



 Sender Name                        Mohamad Raviali

 Function                           Direktur Utama

 Date and Time                      05-10-2026 17:33

 Attachment                        1. LRPD Per 30 Juni 2026 (Koreksi).pdf


   This is an official document of PT Manggung Polahraya Tbk that does not require a signature as it was generated
       electronically by the electronic reporting system. PT Manggung Polahraya Tbk is fully responsible for the
                                       information contained within this document.

File

File Open PDF
Source IDX
Size0.02 MB
Published5 Oct 2026
Pages8
Characters25,990
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 0 people and organisations named in the text · linked when the evidence is strong

The name pass has not read this document yet.

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result