Skip to content
Back to announcement

20261005_GTBO_Tanggapan atas Permintaan Penjelasan Bursa_32163439_lamp1.pdf

Other Text extracted GTBO

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 12

Page 1
Jakarta, 5 Oktober 2026
No.: 040/GTB-JKT/X/2026

Kepada Yth.
PT Bursa Efek Indonesia
Gedung Bursa Efek Indonesia, Tower I, Lantai 6
Jl. Jend. Sudirman Kav. 52-53, Jakarta 12190
Indonesia

U.p: Yth. Divisi Penilaian Perusahaan 3

Perihal: Tanggapan atas Permintaan Penjelasan                   Re: Response to the Exchange's Request for
Bursa Nomor S-12631/BEI.PP3/10-2026                             Explanation No. S-12631/BEI.PP3/10-2026

Dengan hormat,                                                  Dear Sir/Madam,
Menunjuk surat PT Bursa Efek Indonesia ("Bursa")                With reference to the letter of PT Indonesia Stock
Nomor S-12631/BEI.PP3/10-2026 tanggal 1 Oktober                 Exchange (the "Exchange") No. S-12631/BEI.PP3/10-
2026 perihal Permintaan Penjelasan, PT Garda Tujuh              2026 dated 1 October 2026 regarding Request for
Buana Tbk ("Perseroan") dengan ini menyampaikan                 Explanation, PT Garda Tujuh Buana Tbk (the "Company")
penjelasan sesuai urutan pertanyaan Bursa sebagai               hereby submits its explanation in the order of the
berikut:                                                        Exchange's questions as follows:

1. Dokumen Pendukung Persetujuan RKAB                           1. Supporting Documents for RKAB Approval
Pertanyaan Bursa No. 1: Berdasarkan Keterbukaan                 Exchange's Question No. 1: Based on the Disclosure of
Informasi yang disampaikan oleh Perseroan pada 29               Information submitted by the Company on 29
September 2026, disampaikan bahwa RKAB                          September 2026, it was stated that the Company's
Perseroan telah disetujui oleh Kementerian Energi dan           RKAB has been approved by the Ministry of Energy and
Sumber Daya Mineral (Kementerian ESDM) dengan                   Mineral Resources (MEMR) by letter No. T-
surat nomor T-247.RKAB/MB.05/DJB.B/2026 tanggal                 247.RKAB/MB.05/DJB.B/2026 dated 25 September
25 September 2026. Atas hal tersebut agar dapat                 2026. In this regard, please submit the supporting
disampaikan dokumen pendukung terkait persetujuan               documents relating to the RKAB approval granted by the
RKAB yang diberikan oleh Kementerian ESDM.                      MEMR.
Jawaban: Perseroan melampirkan salinan surat                    Answer: The Company attaches a copy of the letter of
Direktorat Jenderal Mineral dan Batubara Kementerian            the Directorate General of Minerals and Coal, Ministry of
ESDM      Nomor      T-247.RKAB/MB.05/DJB.B/2026                Energy     and    Mineral     Resources,      No.      T-
tanggal 25 September 2026 tentang Persetujuan RKAB              247.RKAB/MB.05/DJB.B/2026 dated 25 September
Tahun 2026.                                                     2026 concerning the Approval of the 2026 RKAB.

2. Rencana Produksi Kembali dan Ketenagakerjaan                 2. Production Restart Plan and Workforce
Pertanyaan Bursa No. 2: Berdasarkan: a.                         Exchange's Question No. 2: Based on: a. The
Keterbukaan Informasi yang disampaikan oleh                     Disclosure of Information submitted by the Company on
Perseroan pada 29 September 2026 disampaikan                    29 September 2026, stating that the Company will
bahwa Perseroan akan memulai produksi kembali                   restart production in the 1st or 2nd week of October
pada minggu ke-1 atau minggu ke-2 bulan Oktober                 2026. b. The Company's response to point 6b, stating
2026. b. Tanggapan Perseroan pada poin 6b,                      that the number of employees in the operational and
disampaikan bahwa jumlah karyawan yang di                       mining department or function was only 4 as of 31 March
departemen atau fungsi operasional dan tambang                  2026, compared with 97 as of 31 March 2025. In this
hanya sebanyak 4 orang per 31 Maret 2026 sedangkan              regard, please explain the following:

                Jakarta Office: Gedung Permata Kuningan Lantai 8, Jalan Kuningan Mulia Kav. 9C, Guntur, Setiabudi,
                                   Jakarta Selatan, DKI Jakarta, Indonesia, 12980, (021) 3970 6652
            Site Office: Mining Site PT. Garda Tujuh Buana, Tbk. Sei Tapa Pulau Bunyu Kab. Bulungan, Kalimantan Utara
Page 2
per 31 Maret 2025 sebanyak 97 orang. Atas hal
tersebut, agar dapat disampaikan beberapa hal
berikut:
2.a. Latar belakang Perseroan baru akan memulai                2.a. The background of the Company only restarting
produksi kembali pada minggu ke-1 atau minggu ke-2             production in the 1st or 2nd week of October 2026.
bulan Oktober 2026.
Jawaban: Produksi Kembali membutuhkan persiapan                Answer: Resuming production will require preparations
sewa peralatan dan perlengkapan produksi seperti               for the rental of production equipment and facilities,
alat berat, jetty, Conveyor belt dan perangkat                 such as heavy equipment, jetty facilities, conveyor belts,
pendukung produksi.                                            and other supporting production equipment.
2.b. Tahapan dan proses yang perlu dilakukan agar              2.b. The stages and processes required for the Company
Perseroan dapat memulai produksi kembali.                      to restart production.
Jawaban: Tahapan menuju produksi kembali adalah                Answer: The stages towards restarting production are
sebagai berikut:                                               as follows:
1. Penyelesaian administrasi pasca-persetujuan                  1. Completion of post-RKAB approval administration
    RKAB
2. Penandatanganan/aktivasi kembali kontrak jasa                2. Re-signing and reactivation of mining service
    pertambangan dengan kontraktor alat berat, kapal               contracts with contractors for heavy equipment,
    tongkang, dan solar sebagai penunjang                          barges, and fuel supply to support the Company’s
    operasional.                                                   operations.
3. Mobilisasi alat berat dan tenaga kerja kontraktor            3. Mobilisation of heavy equipment and contractor
    ke lokasi site.                                                workforce to the site.
4. Pemeriksaan kesiapan K3, perbaikan jalan                     4. OHS readiness inspection, repair of hauling roads
    tambang (hauling road) dan sarana penunjang.                   and supporting facilities.
5. Pengupasan tanah penutup (overburden) pada                   5. Overburden stripping at the planned mining blocks.
    blok penambangan yang direncanakan.
6. Penambangan dan pengangkutan batubara ke                     6. Coal mining and hauling to the stockpile/port.
    stockpile/pelabuhan.
2.c. Jumlah karyawan untuk departemen atau fungsi              2.c. The current number of employees in the operational
operasional atau tambang terkini.                              or mining department or function.
Jawaban: Per 31 Maret 2026 jumlah karyawan                     Answer: As of March 31, 2026 the Company had 36
Perseroan seluruhnya sebanyak 36 orang (Catatan 1b             employees in total (Note 1b to the FS). The decrease
LK). Penurunan dari 97 orang (31 Maret 2025) terjadi           from 97 employees (31 March 2025) was due to the
karena kegiatan produksi dihentikan sementara                  temporary suspension of production while the 2026
selama RKAB 2026 belum disetujui.                              RKAB had not been approved.
2.d. Strategi atau upaya yang akan dilakukan oleh              2.d. The strategy or efforts to be undertaken by the
Perseroan agar karyawan Perseroan dapat mencukupi              Company so that its workforce is sufficient for the
kebutuhan kegiatan produksi yang akan dilakukan                production activities to be resumed.
kembali.
Jawaban: Kegiatan penambangan, pengangkutan dan                Answer: Answer: Mining, hauling, and loading
pemuatan dilaksanakan oleh kontraktor jasa                     operations are carried out by mining service contractors
pertambangan yang membawa tenaga kerja dan                     who provide their own workforce and equipment. The
peralatannya sendiri. Karyawan Perseroan berperan              Company’s employees handle technical supervision,
pada fungsi pengawasan teknis, K3, perencanaan                 occupational health and safety (OHS), mine planning,
tambang dan administrasi. Perseroan akan merekrut              and administrative functions. The Company will conduct
kembali untuk tahap persiapan produksi.                        further recruitment for the production preparation
                                                               phase.

               Jakarta Office: Gedung Permata Kuningan Lantai 8, Jalan Kuningan Mulia Kav. 9C, Guntur, Setiabudi,
                                  Jakarta Selatan, DKI Jakarta, Indonesia, 12980, (021) 3970 6652
           Site Office: Mining Site PT. Garda Tujuh Buana, Tbk. Sei Tapa Pulau Bunyu Kab. Bulungan, Kalimantan Utara
Page 3
3. Penjualan Persediaan Sebelum Produksi Kembali                3. Sale of Inventory Before Production Restart
Pertanyaan Bursa No. 3: Berdasarkan: a. Tanggapan               Exchange's Question No. 3: Based on: a. The
Perseroan pada poin 4a, disampaikan bahwa                       Company's response to point 4a, stating that the
Perseroan tidak melakukan penjualan meskipun                    Company did not make any sales despite having
terdapat persediaan karena RKAB tahun 2026 belum                inventory because the 2026 RKAB had not been
disetujui. b. Keterbukaan Informasi yang disampaikan            approved. b. The Disclosure of Information submitted by
oleh Perseroan pada 29 September 2026,                          the Company on 29 September 2026, stating that the
disampaikan bahwa RKAB Perseroan telah disetujui                Company's RKAB was approved by the MEMR on 25
oleh Kementerian ESDM tanggal 25 September 2026.                September 2026. In this regard, please explain whether
Atas hal tersebut, agar dapat dijelaskan apakah                 the Company will first sell its coal inventory before
Perseroan akan melakukan penjualan persediaan batu              restarting production.
bara terlebih dahulu sebelum Perseroan memulai
produksi kembali.
Jawaban: Ya. Per 31 Maret 2026 Perseroan memiliki               Answer: Yes. As of March 31, 2026, the Company holds
persediaan batubara dengan nilai tercatat                       coal inventory with a carrying value of US$1,752,368
US$1.752.368 (Catatan 7 LK). Dengan telah                       (Note 7 to the Financial Statements). Following the
disetujuinya RKAB 2026, persediaan tersebut akan                approval of the 2026 RKAB (Work Plan and Budget), this
dijual terlebih dahulu pada awal bulan Oktober2026              inventory will be sold in early October 2026 to PT Niaga
kepada PT Niaga Energi Dunia dan hasilnya digunakan             Energi Dunia, and the proceeds will be used as a source
sebagai salah satu sumber pendanaan awal kegiatan               of initial funding for production activities. This sales
produksi. Volume penjualan ini diperhitungkan dalam             volume is accounted for within the 2026 RKAB quota.
kuota RKAB 2026.

4. Estimasi Produksi 48,91%–61,13% dari Kuota                   4. Production Estimate of 48.91%–61.13% of Quota
Pertanyaan Bursa No. 4: Berdasarkan Keterbukaan                 Exchange's Question No. 4: Based on the Disclosure of
Informasi yang disampaikan Perseroan pada 29                    Information submitted by the Company on 29
September 2026, disampaikan bahwa estimasi                      September 2026, it was stated that estimated coal
produksi batubara sampai dengan Desember 2026                   production up to December 2026 is 400,000 to 500,000
yaitu sebesar 400.000 s.d. 500.000 MT sedangkan                 MT, whereas the approved coal production is a
persetujuan produksi batubara yang diberikan                    maximum of 817,900 MT. In this regard, please explain
maksimal 817.900 ton. Atas hal tersebut, agar dapat             the background of the Company only estimating
disampaikan bahwa latar belakang Perseroan hanya                production of 48.91% to 61.13% of the approved
mengestimasikan produksi sebesar 48,91% s.d.                    volume.
61,13% dari persetujuan yang diberikan.
Jawaban: Kuota 817.900 MT merupakan kuota untuk                 Answer: The 817,900 MT quota is a full-year quota,
1(satu) tahun penuh, sedangkan persetujuan 25                   whereas approval was only received at September 25,
September 2026. Efektif, Perseroan hanya memiliki               2026. Effectively, the Company has only about 2.5
waktu produksi sekitar 2,5 bulan (pertengahan                   months of production time (mid-October–December
Oktober–Desember 2026), termasuk masa mobilisasi                2026), including contractor mobilisation and ramp-up.
dan ramp-up kontraktor. Periode Oktober–Desember                October–December is also the rainy season, which
juga merupakan musim hujan yang mengurangi hari                 reduces effective working days. The estimate is
kerja efektif. Estimasi disusun secara konservatif              prepared conservatively based on contractor equipment
berdasarkan kapasitas alat kontraktor.                          capacity.

5. Rincian Kontrak Penjualan                                    5. Details of Sales Contracts
Pertanyaan Bursa No. 5: Berdasarkan Keterbukaan                 Exchange's Question No. 5: Based on the Disclosure of
Informasi yang disampaikan pada 29 September 2026,              Information submitted on 29 September 2026, it was
disampaikan bahwa Perseroan memiliki 3 kontrak                  stated that the Company has 3 sales contracts,
penjualan dengan rincian 1 kontrak jangka panjang dan           consisting of 1 long-term contract and 2 short-term
                Jakarta Office: Gedung Permata Kuningan Lantai 8, Jalan Kuningan Mulia Kav. 9C, Guntur, Setiabudi,
                                   Jakarta Selatan, DKI Jakarta, Indonesia, 12980, (021) 3970 6652
            Site Office: Mining Site PT. Garda Tujuh Buana, Tbk. Sei Tapa Pulau Bunyu Kab. Bulungan, Kalimantan Utara
Page 4
2 kontrak jangka pendek. Atas hal tersebut, agar dapat contracts. In this regard, please provide the contract
disampaikan rincian kontrak dengan keterangan details as follows: Counterparty, Term, Contract Value.
sebagai berikut: Nama Pihak, Jangka Waktu, Nilai
Kontrak.

          Nama Pihak                                       Jangka Waktu                                   Kontrak
          Counterparty                                         Term                                   Contract Quantity
GMR Infrastructure (Singapore) LTD               Desember 2026 s.d.Maret 2027                                           150.000 MT
PT Niaga Energi Dunia                        September 2026 s.d. September 2027                                         200.000 MT
Phu Thai Global Corporation                   November 2026 s.d. Desember 2029                                     1.650.000 MT

Nilai kontrak bersifat indikatif karena harga mengacu Contract values are indicative since prices refer to the
pada formula HBA/Indonesian Coal Index (ICI) dan HBA/Indonesian Coal Index (ICI) formula and the actual
kualitas aktual batubara yang dikirim.                quality of coal delivered.

6. Piutang Lain-lain atas Pengembalian Dana                     6. Other Receivables from the Refund of Investment
Investasi (Massicot Trade Limited)                              (Massicot Trade Limited)
Pertanyaan Bursa No. 6: Sehubungan dengan                       Exchange's Question No. 6: In relation to the
tanggapan Perseroan pada poin 3 terkait piutang lain-           Company's response to point 3 regarding other
lain hasil dari pengembalian pembelian wilayah                  receivables arising from the refund of the purchase of
konsesi pertambangan di Indonesia dan/atau Afrika,              mining concession areas in Indonesia and/or Africa,
agar dapat disampaikan beberapa hal berikut:                    please explain the following:
Sebagai latar belakang, pada 30 November 2013                   By way of background, on 30 November 2013 the
Perseroan       memberikan       pinjaman    sebesar            Company extended a loan of US$42,500,000 to
US$42.500.000 kepada Massicot Trade Limited                     Massicot Trade Limited ("Massicot") to fund, among
("Massicot") untuk, antara lain, pendanaan pembelian            others, the acquisition of gold mining concession areas
wilayah konsesi tambang emas di Sudan ("Proyek                  in Sudan (the "Sudan Project"). Under Addendum No.
Sudan"). Berdasarkan Addendum Nomor MT-                         MT-PTGTB/LOAN/2013/ADDENDUM/02122025 dated
PTGTB/LOAN/2013/ADDENDUM/02122025 tanggal                       2 December 2025 (the "Addendum"), the parties agreed
2 Desember 2025 ("Addendum"), para pihak                        on a full and final settlement of obligations of
menyepakati penyelesaian menyeluruh dan final atas              US$45,000,000 (the "Settlement Amount"), payable by
kewajiban sebesar US$45.000.000 ("Jumlah                        Energy Coal Resources Pte. Ltd.
Penyelesaian"), yang dibayarkan oleh Energy Coal
Resources Pte. Ltd.
6.a. Latar belakang Perseroan menyetujui pelunasan              6.a. The background of the Company agreeing to the
Piutang Lain-Lain sampai dengan tahun 2035.                     settlement of Other Receivables until 2035.
Jawaban:                                                        Answer:
Perseroan menyetujui skema pelunasan bertahap                   The Company agreed to the instalment settlement
sampai dengan tahun 2035 dengan pertimbangan                    scheme until 2035 based on the following
sebagai berikut:                                                considerations:
(i) Proyek Sudan mengalami kendala akibat kondisi               (i) The Sudan Project has experienced challenges due to
     keamanan dan konflik bersenjata di Sudan sejak                  the security situation and armed conflict in Sudan
     15 April 2023, yang berdampak terhadap kegiatan                 since 15 April 2023, which have affected
     operasional, akses ke wilayah konsesi, serta                    operations, access to the concession area, as well
     kondisi sistem perbankan dan penerapan sanksi                   as the banking system and the implementation of
     internasional.                                                  international sanctions.


                Jakarta Office: Gedung Permata Kuningan Lantai 8, Jalan Kuningan Mulia Kav. 9C, Guntur, Setiabudi,
                                   Jakarta Selatan, DKI Jakarta, Indonesia, 12980, (021) 3970 6652
            Site Office: Mining Site PT. Garda Tujuh Buana, Tbk. Sei Tapa Pulau Bunyu Kab. Bulungan, Kalimantan Utara
Page 5
(ii) Dengan mempertimbangkan kondisi dan kendala (ii) Taking into consideration the circumstances
      yang dihadapi dalam pelaksanaan Proyek Sudan,          encountered in the implementation of the Sudan
      skema penyelesaian secara bertahap dipandang           Project, the Company considers the phased
      dapat memberikan dasar yang lebih terukur bagi         settlement arrangement to be one of the more
      proses pemulihan dana Perseroan. Skema                 measurable alternatives for the recovery of the
      tersebut juga mempertimbangkan aspek waktu,            Company’s funds. The arrangement was agreed
      biaya, dan kompleksitas apabila penyelesaian           upon taking into consideration the circumstances of
      dilakukan melalui penagihan sekaligus atau upaya       the parties, as well as the time, costs, and
      hukum lintas yurisdiksi.                               complexities that may arise if the settlement were
                                                             pursued through a lump-sum collection or legal
                                                             proceedings across jurisdictions.
(iii) Jumlah Penyelesaian US$45.000.000 lebih tinggi (iii) The settlement amount of US$45,000,000 exceeds
      dari nilai piutang yang harus dikembalikan yang        the amount of receivables to be recovered and
      merupakan kompensasi atas kegagalan investasi          includes compensation of US$1,250,000 in relation
      US$1.250.000 (Pasal 3.2(b)).                           to the unsuccessful investment, as stipulated in
                                                             Article 3.2(b).
(iv) Pembayaran telah mulai direalisasikan, yaitu (iv) Payments have already commenced, amounting to
      sebesar US$846.709 pada triwulan I 2026                US$846,709 in the first quarter of 2026 (Statement
      (Laporan Arus Kas dan Catatan 5), lebih awal dari      of Cash Flows and Note 5), ahead of the first
      jadwal cicilan pertama 15 Mei 2026.                    instalment date of 15 May 2026.
6.b. Ada/tidaknya penalti yang dikenakan kepada 6.b. Whether any penalty was imposed on Massicot
Massicot Trade Limited akibat investasi yang dilakukan Trade Limited because the investment made by the
oleh Perseroan sejak tahun 2013 tidak dapat Company since 2013 could not be carried out, together
dilaksanakan serta penjelasan lebih lanjut mengenai with further explanation thereof.
hal tersebut.
Jawaban:                                                 Answer:
Tidak terdapat penalti dalam bentuk denda. No penalty in the form of a fine was imposed. Under
Berdasarkan Pasal 2.1 dan 2.2 Addendum, para pihak Clauses 2.1 and 2.2 of the Addendum, the parties
mengakui bahwa kegagalan Proyek Sudan disebabkan acknowledge that the failure of the Sudan Project was
keadaan kahar dan bukan merupakan wanprestasi, caused by force majeure and does not constitute a
sehingga tidak ada pihak yang dapat mengajukan default; accordingly, neither party may assert claims
tuntutan di luar kewajiban yang diatur dalam beyond the obligations set out in the Addendum.
Addendum. Sebagai gantinya, Perseroan memperoleh Instead, the Company obtained an additional
tambahan nilai sebesar US$2.500.000 di atas pokok US$2,500,000 above the loan principal, consisting of
pinjaman, yaitu imbalan tambahan US$1.250.000 dan additional consideration of US$1,250,000 and
kompensasi US$1.250.000. Bunga atas pinjaman compensation of US$1,250,000. Interest on the loan
telah dihapuskan sejak Addendum 28 Juni 2024 has been waived since the Addendum dated 28 June
(Recital C dan Pasal 3.4). Ketentuan cidera janji (event 2024 (Recital C and Clause 3.4). The event of default
of default) dan jaminan saham dalam Perjanjian awal and share security provisions of the Original Agreement
tetap berlaku apabila Massicot lalai membayar sesuai remain in force should Massicot fail to pay according to
jadwal (Pasal 8.1).                                      schedule (Clause 8.1).
6.c. Latar belakang nilai Piutang Lain-Lain per 31 Maret 6.c. The background of the Other Receivables balance
2026 sebesar AS$39.769.364 berbeda dengan nilai as of 31 March 2026 of US$39,769,364 differing from
yang tertera di Addendum Perjanjian nomor MT- the amount stated in Addendum Agreement No. MT-
PTGTB/LOAN/2013/ADDENDUM/02122025 tanggal PTGTB/LOAN/2013/ADDENDUM/02122025 dated 2
2 Desember 2025 sebesar AS$45.000.000 dengan December 2025 of US$45,000,000, with the following
rincian rekonsiliasi sebagai berikut, sehingga terdapat reconciliation, resulting in a difference of US$3,883,927.
selisih AS$3.883.927.


                Jakarta Office: Gedung Permata Kuningan Lantai 8, Jalan Kuningan Mulia Kav. 9C, Guntur, Setiabudi,
                                   Jakarta Selatan, DKI Jakarta, Indonesia, 12980, (021) 3970 6652
            Site Office: Mining Site PT. Garda Tujuh Buana, Tbk. Sei Tapa Pulau Bunyu Kab. Bulungan, Kalimantan Utara
Page 6
Keterangan (rekonsiliasi Bursa)           Nilai (AS$)             Description (Exchange's                      Amount (US$)
Nilai pokok berdasarkan                       43.750.000          reconciliation)
addendum perjanjian                                               Principal per addendum agreement                   43,750,000
Kompensasi berdasarkan                          1.250.000         Compensation per addendum                              1,250,000
addendum perjanjian                                               agreement
Dikurangi: Cadangan penurunan                    (500.000)        Less: Allowance for impairment                         (500,000)
nilai                                                             Less: Payments made                                    (846,709)
Dikurangi: Pembayaran yang                       (846.709)        Remaining other receivables                       43,653,291
sudah dilakukan
                                                                  Other receivables balance per FS                   39,769,364
Sisa piutang lain-lain                        43.653.291          as of 31 March 2026
Saldo piutang lain-lain                       39.769.364          Difference                                         3,883,927
berdasarkan LK per 31 Maret 2026
Selisih                                         3.883.927
Jawaban:                                                         Answer:
Perseroan menyampaikan bahwa saldo piutang lain-                 The Company submits that the other receivables
lain menurut Laporan Keuangan Konsolidasian Interim              balance per the Interim Consolidated Financial
per 31 Maret 2026 (Catatan 5) adalah                             Statements as of 31 March 2026 (Note 5) is
US$42.403.291, bukan US$39.769.364, yang terdiri                 US$42,403,291, not US$39,769,364, consisting of a
dari bagian lancar US$4.153.291 dan bagian tidak                 current portion of US$4,153,291 and a non-current
lancar US$38.250.000. Dengan saldo tersebut, tidak               portion of US$38,250,000. On that basis, there is no
terdapat selisih antara Addendum dan LK setelah                  difference between the Addendum and the FS after
memperhitungkan kompensasi yang belum diakui.                    taking into account the unrecognised compensation.
Rekonsiliasinya adalah sebagai berikut:                          The reconciliation is as follows:
Keterangan                                US$                     Description                                  US$
Komponen Penyelesaian Pinjaman                  43.750.000        Loan Settlement Component                          43,750,000
Kompensasi (Pasal 3.2(b)) — dibayar              1.250.000        Compensation (Clause 3.2(b)) —                         1,250,000
akhir 2035                                                        payable end of 2035
Jumlah Penyelesaian sesuai                      45.000.000        Settlement Amount per Addendum                     45,000,000
Addendum                                                          Less: compensation not yet recognised              (1,250,000)
Dikurangi: kompensasi yang belum                (1.250.000)       Receivable recognised as of 31                     43,750,000
diakui                                                            December 2025
Piutang diakui per 31 Desember                  43.750.000        Less: payments received in Q1 2026                      (846,709)
2025
                                                                  Gross receivable as of 31 March                    42,903,291
Dikurangi: pembayaran diterima                   (846.709)        2026
triwulan I 2026
                                                                  Less: allowance for impairment losses                   (500,000)
Piutang bruto per 31 Maret 2026                 42.903.291
                                                                  Net receivable as of 31 March 2026                 42,403,291
Dikurangi: cadangan kerugian                     (500.000)
penurunan nilai                                                   FS balance — current portion                           4,153,291

Piutang neto per 31 Maret 2026                  42.403.291        FS balance — non-current portion                   38,250,000
Saldo LK — bagian lancar                         4.153.291        Balance per FS as of 31 March 2026                 42,403,291

Saldo LK — bagian tidak lancar                  38.250.000        Difference                                                      -

Saldo menurut LK 31 Maret 2026                  42.403.291
Selisih                                                    -



                 Jakarta Office: Gedung Permata Kuningan Lantai 8, Jalan Kuningan Mulia Kav. 9C, Guntur, Setiabudi,
                                    Jakarta Selatan, DKI Jakarta, Indonesia, 12980, (021) 3970 6652
             Site Office: Mining Site PT. Garda Tujuh Buana, Tbk. Sei Tapa Pulau Bunyu Kab. Bulungan, Kalimantan Utara
Page 7
Dengan demikian, selisih US$3.883.927 dalam                     Accordingly, the difference of US$3,883,927 in the
perhitungan Bursa terdiri dari: (i) kompensasi                  Exchange's computation consists of: (i) the
US$1.250.000 yang belum diakui Perseroan; dan (ii)              compensation of US$1,250,000 not yet recognised by
US$2.633.927 yang merupakan perbedaan antara                    the Company; and (ii) US$2,633,927, being the
saldo US$39.769.364 dengan saldo sebenarnya                     difference between the balance of US$39,769,364 the
dalam LK sebesar US$42.403.291.                                 actual FS balance of US$42,403,291.
Bagian lancar US$4.153.291 merupakan cicilan tahun              The current portion of US$4,153,291 represents the
2026 sebesar US$5.000.000 dikurangi pembayaran                  2026 instalment of US$5,000,000 less payments
yang telah diterima US$846.709. Bagian tidak lancar             received of US$846,709. The non-current portion of
US$38.250.000 merupakan cicilan tahun 2027–2035                 US$38,250,000 represents the 2027–2035 instalments
sebesar US$38.750.000 dikurangi cadangan kerugian               of US$38,750,000 less the allowance for impairment
penurunan nilai US$500.000.                                     losses of US$500,000.
Kompensasi         US$1.250.000      belum      diakui.         Compensation of US$1,250,000 not yet recognised.
Kompensasi tersebut baru jatuh tempo dan                        The compensation only falls due and is payable in a
dibayarkan sekaligus pada akhir tahun 2035 (Pasal               single sum at the end of 2035 (Clauses 3.2(b) and
3.2(b) dan 4.3(b)), setelah seluruh cicilan pokok               4.3(b)), after all principal instalments have been settled,
dilunasi, atau hampir 10 tahun dari tanggal pelaporan,          nearly 10 years from the reporting date, and bears no
dan tidak dikenakan bunga (Pasal 3.4). Mengingat                interest (Clause 3.4). Given the very long period and that
jangka waktu yang sangat panjang dan realisasinya               its realisation depends on fulfilment of the entire
bergantung pada pemenuhan seluruh jadwal cicilan,               instalment schedule, management has, on a prudent
manajemen dengan pertimbangan kehati-hatian                     basis, not yet recognised the compensation as a
belum mengakui kompensasi tersebut sebagai piutang              receivable or as income. The compensation will be
maupun pendapatan. Kompensasi akan diakui pada                  recognised when its collectability is assured.
saat ketika ketertagihannya telah dapat dipastikan.
6.d. Latar belakang Perseroan mengakui cadangan                 6.d. The background of the Company recognising an
kerugian penurunan nilai sebesar AS$500.000.                    allowance for impairment losses of US$500,000.
Jawaban:                                                        Answer:
Dasar standar akuntansi. Piutang kepada Massicot                Accounting standard basis. The receivable from
merupakan aset keuangan yang diukur pada biaya                  Massicot is a financial asset measured at amortised
perolehan diamortisasi. PSAK 109 "Instrumen                     cost. SFAS 109 "Financial Instruments" paragraph 5.5.1
Keuangan" paragraf 5.5.1 mewajibkan entitas                     requires an entity to recognise a loss allowance for
mengakui cadangan kerugian atas kerugian kredit                 expected credit losses (ECL) on such financial assets,
ekspektasian (KKE) untuk aset keuangan tersebut, dan            and paragraph 5.5.17 requires ECL to reflect an
paragraf 5.5.17 mensyaratkan pengukuran KKE                     unbiased probability-weighted amount, the time value of
mencerminkan jumlah tertimbang probabilitas, nilai              money, and reasonable and supportable information
waktu uang, serta informasi yang wajar dan terdukung            about past events, current conditions and forecasts of
tentang kondisi masa lalu, kini dan prakiraan masa              future conditions. In line with the Company's accounting
depan. Sesuai kebijakan akuntansi Perseroan (Catatan            policies (Notes 2f and 3 to the FS), the Company applies
2f dan Catatan 3 LK), Perseroan menerapkan                      a forward-looking ECL approach to other receivables.
pendekatan KKE berbasis informasi masa depan untuk
piutang lain-lain.
Perhitungan. Cadangan sebesar US$500.000 dihitung               Computation. The allowance of US$500,000 is
sebesar 10% dari cicilan tahun 2026 sebesar                     calculated as 10% of the 2026 instalment of
US$5.000.000, dan telah diakui dalam laporan                    US$5,000,000, was recognised in the audited financial
keuangan per 31 Desember 2025 yang telah diaudit                statements as of 31 December 2025 and remained
serta tidak berubah per 31 Maret 2026. Cadangan ini             unchanged as of 31 March 2026. The allowance is also
juga diperlakukan sebagai koreksi fiskal positif                treated as a positive fiscal correction (Note 14d to the
(Catatan 14d LK).                                               FS).


                Jakarta Office: Gedung Permata Kuningan Lantai 8, Jalan Kuningan Mulia Kav. 9C, Guntur, Setiabudi,
                                   Jakarta Selatan, DKI Jakarta, Indonesia, 12980, (021) 3970 6652
            Site Office: Mining Site PT. Garda Tujuh Buana, Tbk. Sei Tapa Pulau Bunyu Kab. Bulungan, Kalimantan Utara
Page 8
Pertimbangan manajemen:                                         Management's considerations:
(i) Tahun 2026 merupakan tahun pertama                          (i) 2026 is the first year of the instalment schedule under
      pelaksanaan jadwal         cicilan  berdasarkan                the Addendum and therefore the nearest period with
      Addendum, sehingga merupakan periode dengan                    the highest uncertainty regarding payment
      ketidakpastian kinerja pembayaran yang paling                  performance.
      tinggi dan paling dekat.
(ii) Massicot telah menunjukkan komitmen dengan                 (ii) Massicot has demonstrated its commitment by
      membayar US$846.709 pada triwulan I 2026,                       paying US$846,709 in the first quarter of 2026,
      sebelum tanggal cicilan pertama 15 Mei 2026.                    before the first instalment date of 15 May 2026.
(iii) Piutang dijamin dengan gadai saham yang baru              (iii) The receivable is secured by a share charge to be
      dilepaskan setelah pelunasan penuh (Pasal 6.2),                 released only upon full settlement (Clause 6.2), and
      dan Massicot tetap bertanggung jawab secara                     Massicot remains primarily liable for payment
      utama atas pembayaran (Pasal 5.3).                              (Clause 5.3).
(iv) Riwayat kegagalan Proyek Sudan sejak 2013 dan              (iv) The history of the Sudan Project's failure since 2013
      kondisi geopolitik dipertimbangkan sebagai                      and geopolitical conditions are considered as credit
      indikator risiko kredit.                                        risk indicators.
Perseroan akan mengevaluasi kecukupan cadangan                  The Company will assess the adequacy of the
pada setiap tanggal pelaporan berdasarkan realisasi             allowance at each reporting date based on actual
pembayaran, termasuk realisasi cicilan 2026 sampai              payments, including the realisation of the 2026
dengan 31 Desember 2026.                                        instalment up to 31 December 2026.
6.e. Sehubungan dengan nilai piutang lain-lain atas             6.e. In relation to other receivables from the refund of
pengembalian dana investasi sebesar 104,57% dari                investment amounting to 104.57% of total equity as of
total ekuitas per 31 Desember 2025, agar dapat                  31 December 2025, please state whether the decision
disampaikan apakah keputusan pengembalian dana                  on such refund of investment complied with Article 6
investasi tersebut telah memenuhi pasal 6 ayat (2)              paragraph (2) point d of POJK No. 17/POJK.04/2020 on
poin d POJK nomor 17/POJK.04/2020 tentang                       Material Transactions and Changes in Business
Transaksi Material dan Perubahan Kegiatan Usaha                 Activities, namely having been approved in advance by
dimana telah disetujui oleh Rapat Umum Pemegang                 the General Meeting of Shareholders (GMS). The
Saham (RUPS) sebelumnya. Agar Perseroan                         Company is requested to coordinate with OJK before
melakukan koordinasi dengan OJK sebelum menjawab                answering this question.
pertanyaan ini.
Jawaban:                                                        Answer:
Perseroan akan melakukan koordinasi dan konsultasi              The Company will coordinate and consult with the
dengan Otoritas terkait untuk memperoleh arahan                 relevant authorities to obtain guidance regarding
mengenai pemenuhan ketentuan yang berlaku,                      compliance with the applicable requirements, including
termasuk mengenai kebutuhan persetujuan RUPS                    whether shareholders’ approval is required in
sehubungan dengan laporan keuangan Perseroan                    connection with the Company’s financial statements for
untuk tahun yang berakhir pada 31 Desember 2025                 the year ended 31 December 2025 scheduled for 18
yang direncanakan pada 18 November 2026.                        November 2026

7. Dukungan Pendanaan Pemegang Saham                            7. Funding Support from the Controlling Shareholder
Pengendali
Pertanyaan Bursa No. 7: Berdasarkan tanggapan                   Exchange's Question No. 7: Based on the Company's
Perseroan pada poin 11, disampaikan bahwa salah                 response to point 11, it was stated that one of the steps
satu langkah yang ditempuh oleh manajemen dalam                 taken by management to meet short-term obligations
upaya pemenuhan kewajiban jangka pendek dan                     and operational needs is funding support from the
kebutuhan operasional yaitu dukungan pendanaan dari             controlling shareholder. In this regard, please describe
pemegang saham pengendali. Atas hal tersebut agar               the form of funding support from the controlling

                Jakarta Office: Gedung Permata Kuningan Lantai 8, Jalan Kuningan Mulia Kav. 9C, Guntur, Setiabudi,
                                   Jakarta Selatan, DKI Jakarta, Indonesia, 12980, (021) 3970 6652
            Site Office: Mining Site PT. Garda Tujuh Buana, Tbk. Sei Tapa Pulau Bunyu Kab. Bulungan, Kalimantan Utara
Page 9
dapat disampaikan bentuk dukungan pendanaan dari                shareholder received by the Company, the amount of
pemegang saham pengendali yang telah diterima oleh              funding received, and whether there is any limit on the
Perseroan dan nilai pendanaan yang telah diterima,              controlling shareholder's funding support commitment.
serta ada/tidaknya batasan komitmen dukungan
pendanaan dari pemegang saham pengendali
tersebut.
Jawaban: Dukungan yang diberikan oleh pemegang                  Answer: The support provided by the controlling
saham pengendali kepada Perseroan tidak hanya                   shareholder to the Company is not limited to funding
berupa dukungan pendanaan dalam bentuk setoran                  support in the form of direct cash injections, but also
dana secara langsung, namun juga berupa dukungan                includes support in expediting the settlement and
dalam upaya mempercepat penyelesaian dan                        collection of other receivables, including assisting the
penerimaan pembayaran atas piutang lain-lain,                   Company in communicating and negotiating with
termasuk membantu Perseroan dalam melakukan                     relevant parties. Accordingly, as of the date of this
komunikasi dan negosiasi dengan pihak-pihak terkait.            response, the support provided by the controlling
Dengan demikian, dukungan pemegang saham                        shareholder has primarily been in the form of non-cash
pengendali yang telah diberikan sampai dengan                   support through facilitating the acceleration of
tanggal tanggapan ini terutama berupa dukungan non-             collection and settlement of other receivables, as well
cash dalam bentuk fasilitasi percepatan penagihan               as providing support in the communication and
dan penyelesaian piutang lain-lain serta dukungan               negotiation process with relevant parties. Such support
dalam proses komunikasi dan negosiasi dengan pihak-             has contributed to strengthening the Company’s
pihak terkait, yang manfaatnya mendukung penguatan              liquidity, although its benefits are not entirely reflected
likuiditas Perseroan namun tidak seluruhnya tercermin           as direct cash receipts into the Company’s bank
sebagai penerimaan dana secara langsung pada                    accounts.
rekening Perseroan.

8. Pendanaan Kegiatan Produksi                                  8. Funding of Production Activities
Pertanyaan Bursa No. 8: Strategi dan upaya konkret              Exchange's Question No. 8: The Company's concrete
yang dilakukan Perseroan dalam mendanai rencana                 strategy and efforts to fund the planned production
kegiatan produksi yang akan dilakukan dalam 2 minggu            activities to be carried out in the next 2 weeks, given that
kedepan mengingat aset lancar Perseroan jauh lebih              the Company's current assets are significantly lower
rendah dibandingkan dengan liabilitas jangka pendek             than its current liabilities.
Perseroan.
Jawaban: Perseroan mendanai kegiatan produksi                   Answer: The Company funds production activities
melalui sumber-sumber berikut:                                  through the following sources:
1. Sisa cicilan piutang tahun 2026 sebesar                      1. The remaining instalment of the receivable for
    US$4.153.291 per 31 Maret 2026 yang wajib                        2026 amounted to US$4,153,291 as of 31 March
    diterima paling lambat 31 Desember 2026.                         2026, which is due to be received no later than 31
                                                                     December 2026.
2. Penjualan persediaan batubara dengan nilai                   2. Sale of coal inventory with a carrying amount of
   tercatat US$1.752.368 (lihat jawaban No. 3).                      US$1,752,368 (see answer No. 3).
3. Skema pembayaran kontraktor berbasis volume                  3. Volume-based contractor payment terms (cost
   (cost per ton) yang dibayarkan setelah batubara                   per ton) payable after the coal is sold, so upfront
   terjual, sehingga kebutuhan modal kerja di muka                   working capital needs are relatively small.
   relatif kecil.
4. Uang muka dari pembeli berdasarkan kontrak 4.                      Advance payments from buyers under the sales
   penjualan apabila disepakati.                                      contracts if agreed.
5. Dukungan pendanaan pemegang saham 5.                               Funding support from the controlling shareholder
   pengendali sebagaimana dijelaskan pada jawaban                     as described in answer No. 7.
   No. 7.
                Jakarta Office: Gedung Permata Kuningan Lantai 8, Jalan Kuningan Mulia Kav. 9C, Guntur, Setiabudi,
                                   Jakarta Selatan, DKI Jakarta, Indonesia, 12980, (021) 3970 6652
            Site Office: Mining Site PT. Garda Tujuh Buana, Tbk. Sei Tapa Pulau Bunyu Kab. Bulungan, Kalimantan Utara
Page 10
Demikian kami sampaikan. Atas perhatian dan Thank you for the attention and cooperation.
kerjasamanya, kami ucapkan terima kasih.

                                            Hormat kami/ Yours faithfully



                                                      Yanry Musa
                                                   Direktur / Director

Lampiran/ Attachments:
Salinan surat persetujuan RKAB 2026 Nomor T
247.RKAB/MB.05/DJB.B/2026/ Copy of 2026 RKAB
approval letter No. T-247.RKAB/MB.05/DJB.B/2026;




              Jakarta Office: Gedung Permata Kuningan Lantai 8, Jalan Kuningan Mulia Kav. 9C, Guntur, Setiabudi,
                                 Jakarta Selatan, DKI Jakarta, Indonesia, 12980, (021) 3970 6652
          Site Office: Mining Site PT. Garda Tujuh Buana, Tbk. Sei Tapa Pulau Bunyu Kab. Bulungan, Kalimantan Utara
Page 11
                             KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA        T.   (021) 8295608

                             DIREKTORAT JENDERAL MINERAL DAN BATUBARA                             E.   djmb@esdm.go.id

                             Jalan Prof. Dr. Soepomo, S.H. No. 10 Jakarta 12870                   W.   www.esdm.go.id




Nomor             :    T-2247.RKAB/MB.05/DJB.B/2026                                         25 September 2026

Sifat             :    Segera
Lampiran          :    Satu Berkas
Perihal           :    Persetujuan RKAB IUP Tahap OPERASI PRODUKSI PT
                       GARDA TUJUH BUANA Tahun 2026



Yang Terhormat,
Direksi PT GARDA TUJUH BUANA
MENARA HIJAU LT. 5 RUANG 501A. JL. MT. HARYONO KAVLING 33,
JAKARTA SELATAN 12470


          Berdasarkan hasil evaluasi atas dokumen Rencana Kerja dan Anggaran Biaya (RKAB)
Tahun 2026 PT GARDA TUJUH BUANA, bersama ini kami sampaikan bahwa RKAB dimaksud dapat
disetujui dengan ketentuan jumlah produksi Batubara tahun 2026 maksimal sebesar 817.900 ton
dengan pokok-pokok kegiatan sebagaimana terlampir.

          RKAB Tahun 2026 yang telah disetujui ini agar dipergunakan sebagai acuan bagi Saudara
dalam melaksanakan kegiatan usaha pertambangan selama Tahun 2026 dengan ketentuan:

        1. Persetujuan RKAB ini diberikan berdasarkan hasil evaluasi atas data dan informasi dari
            dokumen RKAB serta dokumen pendukung yang telah disampaikan.
        2. Persetujuan RKAB ini dilarang disalahgunakan untuk kegiatan usaha pertambangan
            yang tidak sesuai dengan ketentuan peraturan perundang-undangan.

          Segala akibat hukum yang timbul di kemudian hari atas ketidaksesuaian atau
ketidakbenaran        data     dan      informasi dalam            permohonan RKAB   yang   disampaikan        atau
penyalahgunaan        persetujuan RKAB ini, sepenuhnya menjadi tanggung jawab Saudara dan
persetujuan RKAB ini dapat dibatalkan.

          Apabila terdapat kekeliruan dalam persetujuan RKAB, maka akan dilakukan perbaikan
persetujuan sesuai dengan ketentuan peraturan perundang-undangan.
Page 12
      Demikian untuk dilaksanakan dengan sebaik-baiknya. Atas perhatian Saudara, kami
sampaikan terimakasih.

                                                a.n. Menteri Energi dan Sumber Daya Mineral
                                                     Direktur Jenderal Mineral dan Batubara,




                                                     Tri Winarno


Tembusan:


  1. Menteri Energi dan Sumber Daya Mineral
  2. Menteri Kehutanan
  3. Menteri Lingkungan Hidup
  4. Gubernur Kalimantan Utara
  5. Direktur Jenderal Pajak, Kementerian Keuangan
  6. Sekretaris Direktorat Jenderal Mineral dan Batubara
  7. Direktur Pembinaan Program Mineral dan Batubara
  8. Direktur Pembinaan Pengusahaan Batubara
  9. Direktur Teknik dan Lingkungan Mineral dan Batubara
 10. Direktur Penerimaan Mineral dan Batubara

File

File Open PDF
Source IDX
Size0.61 MB
Published5 Oct 2026
Pages12
Characters48,790
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 0 people and organisations named in the text · linked when the evidence is strong

The name pass has not read this document yet.

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result