INVESTOR UPDATE
SIMC 2026
PT. Trimegah Bangun Persada Tbk | NCKL.JK
HARITA NICKEL
HPAL Project at Harita Nickel
Investor Update - SIMC 2026
Page 2
DISCLAIMER
By attending the meeting where this presentation is made, or by reading the presentation materials, you are agreeing to maintain absolute confidentiality regarding the information disclosed in this document and to be bound by
the following limitations:
You must read the following before continuing. The following applies to the confidential information following this page, any oral presentation of such information and other materials distributed at, or in connection with, the
following, and you (each referred to hereafter as a “Recipient”) are therefore advised to read this carefully before reading, accessing or making any other use of these materials. In accessing these materials, each Recipient agrees
to maintain strictest confidentiality regarding such information disclosed and to be bound by the following terms and conditions. Any failure to comply with these terms and conditions may constitute a violation of applicable
securities laws.
This following presentation has been prepared by PT Trimegah Bangun Persada Tbk (the “Company”) solely for selected recipients for information purposes. Information contained in this document is highly confidential and is
being made available and intended solely for the personal reference and information of a Recipient. Neither this document nor any part thereof may be retained by the Recipient nor may any portion thereof by shared, copied,
reproduced or redistributed to any other person in any manner.
The information contained in these materials has not been independently verified, approved or endorsed and is subject to material changes. The information and opinions in this document is subject to change without notice, its
accuracy is not guaranteed and it may not contain all material information concerning the Company. Neither the Company nor any of its affiliates (together with the Company, the “Group”), make any representation, express or
implied, regarding, and assumes any responsibility or liability whatsoever (in negligence or otherwise) for, the fairness, accuracy or completeness of, or any errors or omissions in, any information contained herein nor for any loss
howsoever arising from any use of these materials.
Certain statements in these materials constitute “forward-looking statements” and information with respect to the future financial condition, results of operations and certain plans and objects of management of the Company
and the Group. Forward-looking statements may include words or phrases such as the Company or any of its business components, or its management “believes”, “expects”, “anticipates”, “intends”, “plans”, “foresees”, or other
words or phrases of similar import. Similarly, statements that describe the Company's objectives, plans or goals both for itself and for any of its business components also are forward- looking statements. Such forward- looking
statements are made based on management’s current expectations or beliefs as well as assumptions made by, and information currently available to, management. Neither the Company nor any of its advisers assumes any
responsibility to update forward-looking statements or to adapt them to future events or developments. These forward-looking statements speak only as at the date of this presentation and nothing contained in this presentation
is or should be relied upon as a promise or representation as to the future. There is no obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise. These
forward-looking statements are based on the Company’s current views concerning future events, and necessarily involve and are subject to risks, uncertainties and assumptions and other matters beyond the control of the
Company. Actual future performance could differ materially from these forward-looking statements, and a Recipient should not place any undue reliance on these forward-looking statements, which speak only as of the date of
these materials. The information in these materials is provided as at the date of this document (unless stated otherwise) and is subject to change without notice. No representation is being made that such forward-looking
statements and information will actually be achieved. The Recipient should carefully consider such forward-looking statements and information (as well as the information in this presentation generally) and should not place
undue reliance on these forward-looking statements.
To the extent available, the industry, market and competitive position data contained in this presentation has come from official or third party sources. Third party industry publications, studies and surveys generally state that the
data contained therein have been obtained from sources believed to be reliable, but that there is no guarantee of the accuracy or completeness of such data. While the Company believes that each of these publications, studies
and surveys has been prepared by a reputable source, the Company has not independently verified the data contained therein. In addition, certain industry, market and competitive position data contained in this presentation
come from the Company's own internal research and estimates based on the knowledge and experience of the Company's management in the market in which the Group operates. While the Company believes that such research
and estimates are reasonable and reliable, they, and their underlying methodology and assumptions, have not been verified by any independent source for accuracy or completeness and are subject to change without notice.
Accordingly, undue reliance should not be placed on any of the industry, market or competitive position data contained in this presentation. No representation or warranty, expressed or implied, is made as to, and no reliance
should be placed on, the fairness, accuracy, completeness or correctness of, the information (including certain data that was obtained from various external data sources, and which have not been verified with independent
sources) or otherwise made available or opinions or as to the reasonableness of any assumption contained herein. This information and materials should not be regarded by Recipients as a substitute for the exercise of their own
judgment. Recipients and other parties must exercise their own judgment and make their own investigations as to the suitability of any potential investment in the Company.
It is not the intention to provide, and the Recipient may not rely on these materials as providing, a complete or comprehensive analysis of the financial or trading position or prospects of the Company and the Group. This
presentation is a summary only and does not purport to contain all of the information on the Company, particularly with respect to the risks and special considerations involved with an investment in the securities of the Company.
The information contained in these materials includes historical information about, and relevant to the assets of, the Company and the Group that should not be regarded as an indication of the future performance or results of
such assets.
2 | Investor Update - SIMC 2026
Page 3
Table of Content
01 Industry Overview 04
02 Harita Nickel at a Glance 06
03 ESG & Sustainability 10
Shipment activities at Harita Nickel
3 | Investor Update - SIMC 2026
Page 4
1. Industry Overview
Indonesia dominates the global nickel market, accounting for over half
of global mining production, primarily driven by its massive laterite ore
reserves. Demand for refined nickel remains robust and is projected to
stay strong in the years ahead, primarily driven by its extensive use in
the construction sector for stainless steel, while the battery industry
for electric vehicles (EVs) is expected to recover post-destocking amid
varied metal content across battery types.
CKM Project at Harita Nickel
Investor Update - SIMC 2026
Page 5
NICKEL ECOSYSTEM IN INDONESIA
Construction Household
SS Welded
SS Slab SS HRC/CRC
Pipe
NPI /
SS Seamless Building Industrial
Ferronickel
Pipe Materials Tools
RKEF SS Billet SS Rod Bar
Saprolite Ore SS Bolt &
Nuts
SS Based
Nickel Matte Pure Nickel Electronic
Alloy Railways
Laterite Components
Nickel Mining Plating
Pure Cobalt Automotive
HPAL Ship Building
Nickel Components
Limonite Ore MHP
Sulphate Battery Cathode Nickelbased
Cobalt Precursor Materials Battery
Sulphate
Electrolytic
Electric Vehicle Energy Storage
Cobalt
Electrolytic
Nickel
Battery Charging Agriculture
Station Equipment
Key Activities
Upstream Midstream Downstream
RKEF Stainless Steel
Saprolite Ferronickel
Nickel Matte
Cathode
Nickel Sulfate
Industrial
HPAL MHP Zone
Limonite Precusors
(Mixed Hydroxide Percipitate) Cobalt Sulfate
EV Battery
Electrolytic Cobalt Recycling
Not Implemented Future Opportunities Planned
5 | Investor Update - SIMC 2026
Page 6
2. Harita Nickel at a Glance
Harita Nickel is a globally recognized, integrated, and responsible
nickel mining and processing company from Indonesia. Established
under the name PT Trimegah Bangun Persada Tbk, Harita Nickel is part
of the Harita Group. Through continuous improvement of people and
processes, Harita Nickel are committed to optimizing the value of
resources and delivering positive outcomes to Shareholders,
Stakeholders, and Community.
HPAL Project at Harita Nickel
Investor Update - SIMC 2026
Page 7
TBP is a pure-play integrated nickel mining and processing operator that produces the largest
amount of diversified set of nickel products in Indonesia from RKEF and HPAL facilities
Scaled Nickel Reserves & Resources Vertically Integrated Nickel Operations with
Sustainability First Philosophy Embedded into
Harita Nickel has ample nickel reserves and Strategy
resources to support all of its operations, across all
the JV projects (RKEF and HPAL plants). Presence from upstream mining to midstream
nickel processing and investment in planned
industrial park operation through subsidiaries and
associated companies.
Diversified Nickel Products Offering Leveraging Unique Geographical Advantage with Operational
RKEF and HPAL technologies Synergies
Diversified product portfolio, including ferronickel, All projects are strategically planned on Obi Island,
MHP, nickel & cobalt sulphate and electrolytic achieving further operational efficiency.
cobalt provides exposure to stainless steel, battery
materials, and broader industrial applications.
Low Mining and Processing Cash Cost 1 Pioneer in HPAL technology
Achieved low cash cost(1) for both mining and Indonesia’s first nickel processor to construct HPAL
processing activities and ranked as one of the technology in 2018 and started operations in 2021,
lowest cost player in Indonesia. leading the local nickel processing industry through
effective utilization of limonite overburden for
productive use to improve profitability.
Strong Support from Sponsor and Partners Committed to Sustainable Development
Strategic synergies from local sponsor and global First mining Company in Indonesia to voluntarily
partners – Harita Group with local knowledge and undergo IRMA assessment and has invested in
global partners with technological know-how. various environmental management and
sustainability initiatives.
Source: Company Filling.
Notes: (1) According to AME.
7 | Investor Update - SIMC 2026
Page 8
FROM OBI, FOR INDONESIA
>26,000 >85% 45%
Employees Indonesians Employees from North Maluku
Mining HPAL RKEF
HPL MSP HJF
TBP GPS GTS
JMP & OAM
ONC KPS
8 | Investor Update - SIMC 2026
Page 9
TBP COMPETITIVE ADVANTAGE
Integrated Facilities and Strategic Location
Integrated Operations
Vertically integrated operations that
provides synergy & more efficient
operations from mining to processing.
Close Proximity to End Buyers
All facilities and infrastructures are
strategically planned & build on west
part of Obi Island, North Maluku – that
give close proximity to biggest
China consumers of nickel products.
Dedicated Ports & Jetties
Special Terminals are in operation to
cater export – import activities.
03
Reserves & Resources Dedicated Power Plants
Harita Nickel has ample nickel reserves and Power Plants used to ensure
resources to support all of its operations, across sustainable operations and support
Obi all the JV projects (RKEF and HPAL plants).
02 04 production capacity expansion.
Jakarta
Total Mining Area Road Infrastructure
Consist of 5 IUP that located in 01 01 05 Concrete Roads to support
Obi Island. land transport activities.
9 | Investor Update - SIMC 2026
Page 10
3. ESG & Sustainability
The Company recognizes the importance of protecting the natural
environment and supporting local communities in order to build a
sustainable future. Environmental, Social, and Governance (ESG)
awareness has recently emerged as a growing trend among Investors,
Customers, and other Stakeholders. ESG represent a key component of
corporate responsibility and business sustainability.
Soligi Village at Obi Island
Investor Update - SIMC 2026
Page 11
ALIGNMENT WITH GOLD STANDARD MARKET REQUIREMENTS:
IRMA, RMAP, and RMAP+
The 1st in Indonesia & Asia Ensuring Continued Market Access
IRMA Audit RMAP & RMAP+ Certification
Responsible Mining Assurance. Alignment with Market Traceability Requirements.
Harita Nickel is the first company globally to release public update on RMAP compliance advantages:
Corrective Action Plan to demonstrate transparency and inform risk Ensured responsible sourcing through industry-leading annual
assessments to markets and Stakeholders. audits.
Current Updates: RMAP+ ensured continue access to Chinese & EU markets by
Focused on performing several studies & Stakeholders verifying supplier compliance with relevant regulations:
engagement. China’s EV Battery "Digital ID" mandate.
1. Engaging community to communicate recent project updates. EU Battery Regulation Due Diligence requirement and EU
2. Performing cumulative impact assessment, biodiversity Corporate Sustainability Due Diligence Directive (CSDDD).
implementation independent review, completing management
system for environment, and community health impact Current Updates:
assessment. RMAP on-site audits completed for HJF operations and re-
Submitting documentation for site audit preparation. certification completed for HPL & ONC operations.
Preparing corrective action period after on-site audit. RMAP+ on-site audits completed for HPL & ONC.
Addressing Preliminary Finding Assessments (PFAs) via Corrective
1. Administration preparation & arrangements.
Action Plan (CAP).
2. Internal audits & progress tracking of corrective actions.
11 | Investor Update - SIMC 2026
Page 12
WASTE MANAGEMENT
Nickel Slag ex RKEF Process
Nickel Slag
Wastewater treatment plant Tailing transport
Bricks Reef Cubes Drainage
Leachate Pond
Tailing ex HPAL Process Soil Ameliorant Road Construction
Dry Stack Tailing Facility
DSTF method is best practice in Regular tailings toxicity tests.
tailing management. Regular facility stability
2-step process: neutralize wet monitoring.
tailing then drying process Drainage system; water diverted Drainage Construction
Concrete Road in PT HJF Area Concrete Road in PT HPL Area in the Industrial area
through filter press. to leachate treatment ponds.
Dried tailing is backfilled to ex Water monitoring and treatment
mined out pit. at pond outflow. TBP does not adopt Deep Sea Tailing Placement (DSTP) method.
12 | Investor Update - SIMC 2026
Page 13
Solar Panel Project
This project is one of Harita Nickel’s initiatives
to reduce carbon emissions by utilizing solar
energy and to ensure sustainable business
operations. The solar panel are located in
several key areas.
13 | Investor Update - SIMC 2026
Page 14
Steam Power Plant Project
Steam power plant utilizes the excess steam
produced by sulfuric acid plant in HPAL area to
generate electricity. Through this project, the
Company expect to consume green energy and
improve cost efficiency.
14 | Investor Update - SIMC 2026
Page 15
New Kawasi Settlement
Religious worship facilities.
4 types of housing units.
Concrete roads with widths Integrated agricultural area
of 7 meters and 5 meters. (Salam Kawasi): training and
Integrated waste development of high-value
management system. agricultural commodities.
Integrated economic facilities Public service facilities: village
(kiosk unit and Harita Nickel- office, village-owned enterprise
empowered SMEs (BUMDes), multi-function hall,
Center). health center, and a children’s
playground.
Sports facilities for students 24-hours access to electricity
and the community. and clean water.
Educational facilities: early childhood education, islamic
elementary, junior high, and senior high schools.
15 | Investor Update - SIMC 2026
Page 16
ADDITIONAL FACILITIES
IN NEW KAWASI
SETTLEMENT Community Health Center
Wastewater Management Plant Primary School Canteen
Economic Area Bus Shelter
Boarding Houses
16 | Investor Update - SIMC 2026
Page 17
Community Development & Empowerment Program
Health Service Education Socio Culture
Free health services ensure that everyone Free education provides equal learning Socio-cultural aspects shape the values,
in the community receives essential opportunities for everyone in the traditions, and interactions within a
medical care. These services help prevent community. It helps reduce poverty, community. They influence how people
diseases, reduce stunting, and promote empowers individuals, and builds a live, communicate, and work together,
overall well-being, making healthcare brighter future for all. fostering a shared identity and social
accessible to all. harmony.
17 | Investor Update - SIMC 2026
Page 18
Community Development & Empowerment Program
18 | Investor Update - SIMC 2026
Page 19
2026 CHALLENGES
The Company continues to maintain strong resilience amid uncertain market dynamics this year.
Macroeconomics Capital Market
Geopolitical tensions between China & Russia and MSCI’s freeze on listings and weight increases due
USA & Europe drive tariff wars and impact to to free float concerns, which limits foreign inflows
critical minerals market. and caps large-cap upside until the next update.
Meanwhile, negative outlooks from Moody’s and
The war in Middle East impacted to higher fuel,
Fitch over government policy uncertainty, fiscal
sulfur, and coal prices.
deficits, and a weaker exchange rate raise
Recent Government regulation changes consist of borrowing costs and weaken investor confidence.
higher royalty for nickel ore, a new formula of HPM,
and a single-gate export system under DSI The new free float regulations requires the
(Danantara Sumber Daya Indonesia). Company to reach at least 15% public ownership by
2027/2028, which creates additional challenges
amid unfavorable market conditions.
The exclusion of PE (Private Equity) and VC
(Venture Capital) from the free float calculation,
places some pressure on the Company to meet the
requirement of the minimum free float thresholds.
19 | Investor Update - SIMC 2026
Page 20
Thank You
Contact Us:
+62 – 21 - 5722924
investor.relations@haritanickel.com
Panin Bank Building
Jendral Sudirman Kav.1
Jakarta 10270 – Indonesia.
Obi Industrial Estate at Obi Island
Investor Update - SIMC 2026
Names mentioned 4 people and organisations named in the text · linked when the evidence is strong
unresolved
org
PT HJF Area
p.12
unresolved
org
PT HPL Area
p.12
unresolved
org
Bank Building Jendral Sudirman