Back to announcement
20260115_BUVA_Laporan Penggunaan Dana Hasil Penawaran Umum_32020549.pdf
Other Text extracted BUVASource file signed link, expires in 15 minutes
Extracted text 6
Page 1
Go To English Page
Nomor Surat 009A.03.04/BUVA/I/2026
Nama Perusahaan PT Bukit Uluwatu Villa Tbk
Kode Emiten BUVA
Lampiran 1
Perihal Laporan Penggunaan Dana Hasil Penawaran Umum
Dana yang diperoleh dari Penawaran Umum IDR
Rencana Realisasi
Jumlah
Biaya Hasil Penggunaa Penggunaa
Hasil
Jenis Penawaran Realisasi n Dana n Dana Sisa Dana
Tanggal Penawaran
Penawaran Nama Emisi Umum Bersih Menurut Menurut (satuan
Efektif Umum
Umum (satuan mata (satuan Prospektus Prospektus mata uang)
(satuan
uang) mata uang) (satuan (satuan
mata uang)
mata uang) mata uang)
07
603.987.214. 3.541.993.60 600.445.220. 600.445.220. 492.835.755. 107.609.465
Right Issue BUVA-R November
350 7 743 743 320 .423
2025
Penempatan Sisa Dana
Jenis
Kode Nama
Penawaran Penempatan List
Efek
Umum
Sisa Dana Hubungan
Tingkat Bunga/ Jangka Waktu
(satuan mata Penempatan dengan
Bagi Hasil Penyimpanan
Right Issue BUVA-R uang) Perusahaan
107.609.465.42
0 % Rekening Giro 0 pihak Tiga
3
Rincian Rencana Penawaran Umum
Jenis
Kode Nama
Penawaran Tanggal Efektif Rencana List
Efek
Umum
Hasil
Realisasi Jumlah
Bersih Uraian (satuan mata Persentase
(satuan mata uang)
uang)
Pembelian
07 November 600.445.220.74 416.235.755.32
Right Issue BUVA-R Saham PT Bukit 69 %
2025 3 0
Permai Properti
Penyertaan
600.445.220.74
Modal di PT 76.600.000.000 13 %
3
Bukit Bali Permai
Pembelian dan
600.445.220.74 107.609.465.42
Pengembangan 18 %
3 3
Lahan
Page 2
Rincian Realisasi Penawaran Umum
Jenis
Kode Nama
Penawaran Tanggal Efektif Realisasi List
Efek
Umum
Hasil
Realisasi Jumlah
Bersih Uraian (satuan mata Persentase
(satuan mata uang)
uang)
07 November
Right Issue BUVA-R Pembelian
2025 600.445.220.74 416.235.755.32
Saham PT Bukit 69 %
3 0
Permai Properti
Penyertaan
600.445.220.74
Modal di PT 76.600.000.000 13 %
3
Bukit Bali Permai
Rincian Biaya Penawaran Umum
Jenis Jumlah Jumlah
Tanggal Persenta
Penawaran Kode Efek Hasil Uraian (Satuan Mata
Efektif se
Umum Penawaran Uang)
Right Issue BUVA-R 07 November 603.987.214.35a. biaya jasa penjaminan
2025 0 (underwriting fee);
0 0 %
b. biaya jasa
penyelenggaraan
0 0 %
(management fee);
c. biaya jasa penjualan
(selling fee);
0 0 %
d. biaya jasa profesi
penunjang pasar modal;
2.139.981.483 0,3543 %
e. biaya jasa lembaga
penunjang pasar modal;
76.300.000 0,0126 %
dan
f. biaya jasa konsultasi
keuangan (financial
981.000.000 0,1624 %
advisory fee).
g. Biaya lain-lain yang
dapat diatribusikan
344.712.124 0,0571 %
langsung sebagai biaya
emisi***)
Demikian untuk diketahui.
Hormat Kami,
PT Bukit Uluwatu Villa Tbk
Rian Fachmi
Corporate Secretary
Page 3
PT Bukit Uluwatu Villa Tbk
Gedung Graha Iskandarsyah Lantai 6, Jalan Iskandarsyah Raya No 66C, Jakarta
Telepon : Kantor cabang :021-7209957, Fax : Kantor cabang : 021-7207523, www.
Nama Pengirim Rian Fachmi
Jabatan Corporate Secretary
Tanggal dan Waktu 15-01-2026 23:12
Lampiran 1. 009A.03.04 - BUVA_Laporan Hasil LRPD RI 1.pdf
Dokumen ini merupakan dokumen resmi PT Bukit Uluwatu Villa Tbk yang tidak memerlukan tanda tangan karena
dihasilkan secara elektronik oleh sistem pelaporan elektronik. PT Bukit Uluwatu Villa Tbk bertanggung jawab penuh
atas informasi yang tertera didalam dokumen ini.
Page 4
Go To Indonesian Page
Announcement Number 009A.03.04/BUVA/I/2026
Issuer Name PT Bukit Uluwatu Villa Tbk
Issuer Code BUVA
Attachment 1
Subject Laporan Penggunaan Dana Hasil Penawaran Umum
Fund received form the public offering IDR
Amount of Plan for use Realized
Proceed Cost of of proceed Use of Fund
Type of Net Remaining
Name of from the Public according to according to
public Listing Date Realization Fund (in
Issuance Public Offering (in the the
offering (in Currency) Currency)
Offering (in Currency) Prospectus Prospectus
Currency) (in Currency) (in Currency)
603,987,214, 3,541,993,60 600,445,220, 600,445,220, 492,835,755, 107,609,465
Right Issue BUVA-R
350 7 743 743 320 ,423
Allocation of Remaining Fund
Type of public Name / Code of
List of allocation
offering Securities
Remaining Fund Interest/Yield Relationship with
Allocation Retention Period
(in Currency) Rate the company
Right Issue BUVA-R
107,609,465,42
0 % Rekening Giro 0 pihak Tiga
3
Details of Public Offering Plan
Type of public Name / Code of
Listing date List of plans
offering Securities
Net Realization Amount (in
Description Percentage
(in Currency) Currency)
Pembelian
600,445,220,74 416,235,755,32
Right Issue BUVA-R Saham PT Bukit 69 %
3 0
Permai Properti
Penyertaan
600,445,220,74
Modal di PT 76,600,000,000 13 %
3
Bukit Bali Permai
Pembelian dan
600,445,220,74 107,609,465,42
Pengembangan 18 %
3 3
Lahan
Page 5
Details of Public Offering Realization
Type of Public Name / Code of
Listing Date Realization Plan
Offering Securities
Net Realization Amount (in
Description Percentage
(in Currency) Currency)
Right Issue BUVA-R Pembelian
600,445,220,74 416,235,755,32
Saham PT Bukit 69 %
3 0
Permai Properti
Penyertaan
600,445,220,74
Modal di PT 76,600,000,000 13 %
3
Bukit Bali Permai
Details of Cost of Public Offering
Amount of
Type of Public Amount (in Percenta
Securities Code Listing Date Proceed for the Description
Offering Currency) ge
Public Offering
Right Issue BUVA-R 603,987,214,35a. Underwriting fee
0
0 0 %
b. Management fee
0 0 %
c. Selling fee
0 0 %
d. Capital Market
Supporting Profession
2,139,981,483 0.3543 %
fee
e. Capital Market
Supporting Institution fee
76,300,000 0.0126 %
f. Financial advisory fee
981,000,000 0.1624 %
g. Other fees which can
be directly attributed as
344,712,124 0.0571 %
securities issuance fees
Thus to be informed accordingly.
Respectfully,
PT Bukit Uluwatu Villa Tbk
Rian Fachmi
Corporate Secretary
Page 6
PT Bukit Uluwatu Villa Tbk
Gedung Graha Iskandarsyah Lantai 6, Jalan Iskandarsyah Raya No 66C, Jakarta
Phone : Kantor cabang :021-7209957, Fax : Kantor cabang : 021-7207523, www.
Sender Name Rian Fachmi
Function Corporate Secretary
Date and Time 15-01-2026 23:12
Attachment 1. 009A.03.04 - BUVA_Laporan Hasil LRPD RI 1.pdf
This is an official document of PT Bukit Uluwatu Villa Tbk that does not require a signature as it was generated
electronically by the electronic reporting system. PT Bukit Uluwatu Villa Tbk is fully responsible for the information
contained within this document.
Names mentioned 4 people and organisations named in the text · linked when the evidence is strong
unresolved
org
PT Bukit
p.1 ×4
unresolved
person
Rian Fachmi
· Corporate Secretary
p.2 ×2
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
No extraction attempted yet.