Skip to content
Back to announcement

20260114_TBIG_Laporan Penggunaan Dana Hasil Penawaran Umum_32019965_lamp1.pdf

Other Text extracted TBIG

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 7

Page 1

          
Page 2
                                                                                                    Laporan Reatisasi Penggunaan Dana Hasil Penawaran Umum Bcrkclanjutan
                                                                                                 Obligasi Berkelanjutan VII Tower Bersama Infrastructure Tbk Tahap II Tahun 2025
                                                                                                                       PT Tower Bcrsama Infrastructure Tbk
                                                                                                                                31 Dcscmber 2025

                                               Nilai Realisasi Hasil Penawaran Umum                                                Rencana Penggunaan Dana                                             Realisasi Penggunaan Dana
          Jenis                                                                                                                                                                                                                                          Sisa Dana Hasil
                        Tanggal
No.    Penawaran                       Jumlah Hasil       Biaya Penawaran                                                                                                                                                                               Penawaran Umum
                        Efektif                                                 Hasil Bersih                        Uraian                         Total                    %                       Uraian                             Total
         Umum                        Penawaran Umum            Umum
                                                                                                   Seluruh dana yang diperoleh dari hasit                                          Seluruh dana yang diperoleh dari hasil
                                                                                                   Penawaran Umum Obligasi, setelah                                                Penawaran Umum Obligasi, setelah
                                                                                                   dikurangi biaya-biaya Emisi ("Nilai Emisi                                       dikurangi biaya-biaya Emisi ("Nilai Emisi
                                                                                                   Obligasi Bersih"), akan digunakan untuk                                         Obligasi Bersih") i akan digunakan untuk
                                                                                                   ;                                                                               ;


                                                                                                   sebesar Rp1.243.075.000.000 atau 78,1%                                          ,ebesar Rp1.243.075.000.000 atau 78,1%
                                                                                                                                                1,243,075,000,000        78.10%    dari Nilai Emisi Obligasi Bersih akan            1,243,075,000,000
1.                                                                                                 dari Nilai Emisi Obligasi Bersih akan
                                                                                                   digunakan oleh Perseroan untuk                                                  digunakan oleh Perseroan untuk
                                                                                                   mendanai seluruh kewajiban Perseroan                                            mendanai seluruh kewajiban Perseroan
         Obligasi                                                            1,591,670,591,199     dalam rangka rencana pelunasan                                                  dalam rangka rencana pelunasan seluruh
                      26 Juni 2025    1,600,000,000,000     8,329,408,801
      Berkelanjutan                                                                                seluruh pokok Obligasi Berkelanjutan VI                                         pokok Obligasi Berkelanjutan VI Tahap IV
                                                                                                   Tahap IV Seri A pa.da tanggal jatuh                                             Seri A pada tanggal jatuh tempo.
                                                                                                   tempo.
-                                                                                                                                                                                  sisanya akan digunakan oleh Perseroan
                                                                                                   sisanya akan digunakan oleh Perseroan
                                                                                                   untuk melakukan pembayaran sebagian                                             untuk melakukan pembayaran sebagian
                                                                                                   pokok pinjaman kepada BNI yang timbut                                           pokok pinjaman kepada BNI yang timbul
2.                                                                                                 berdasarkan Fasilitas Pinjaman BNI pada        348,595,591,199         21.90%   berdasarkan Fasititas Pinjaman BNI pada           348,595,591,199
                                                                                                   tanggal jatuh tempo.                                                            tanggal jatuh tempo.



      JUMLAH                         1,600,000,000,000     8,329,408,801      1,591,670,591,199                                                1,591,670,591,199         100.00%                                                   1,591,670,591,199




                                                                                                                                                                                                                                                                           "f/;




                                                                                                                                                                                                       Jakarta, 12             Januari 2026

                                                                                                                                                                                                        P�;;c:r: Tbk




                                                                                                                                                                                                        Helmy Yusman Santoso
Page 3
PT TOWER BERSAMA INFRASTRUCTURE TBK
BIAVA PENAWARAN UMUM
31 Desember 2025
Obligasi Berkelanjutan VII Tower Bersama Infrastructure Tbk Tahap II Tahun 2025




      1
      -
          Biaya--
                Jasa Penjamin
                          -- Emisi ---Obligasi           0.200%          3,200,000,000   0.200%        3,200,000,000   0.000%
      2   Biaya jasa
                  -   Profesi Penunjang
                              --        Pasar
                                          ---  Modal     0.051%            821,978,182   0.051% - -      820,082,878   0.000%    1,895,304
      3   Biaya Lembaga Penunjang Pasar Modal            0.076%          1,218,181,818
                                                                                ----     0.076%        1,218,181,818 - 0.000%
      4   Biaya lain-lain               - -              0.196%          3,139,924,242   0.193%        3,091,144,105   0.003%   48,780,137
                                                                                                                     � --

                        JUMLAH                          0.524%          8,380,084,242    0.521%       8,329,408,801   0.003%    50,675,441


                                                                                                                                             �-
Page 4
PT TOWER BERSAMA INFRASTRUCTURE TBK
Obligasi Berkelanjutan VII Tower Bersama Infrastructure Tbk Tahap II Tahun 2025

                                                                                                       Pokok Surat Utang
                                                  Surat Utang
                                                                                                           Dalam IDR
 ,Li_g_asi Berkelanjutan V Tower Bersama Infrastructure Tbk Tahap IV Tahun 2022 Seri B                               1,243,075,000,000
                                                                                                   1                                   1
�                 JUMLAH                                                                           ]               1,243,075,000,000




□No
       Perusahaan
          Anak
          TB
                                                       Fasilitas Pinjaman
                    Fasilitas _e_inj_aman ber_g_ulir dari PT Bank Negara Indonesia (Persero) Tbk
                    JUMLAH
                                                                                                            Pokok
                                                                                                           Dalam IDR
                                                                                                                        348 c;a     aa
                                                                                                                       348,595,591,199


                                                                                                                                           �-
Page 5
                                                                                          Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum Berkelanjutan
                                                                                     Sukuk ljarah Berkelanjutan I Tower Bersama Infrastructure Tbk Tahap II Tahun 2025
                                                                                                            PT Tower Bersama Infrastructure Tbk
                                                                                                                     31 Desember 2025

                                              Nilai Realisasi Hasil Penawaran Umum                                          Rencana Penggunaan Dana                                         Realisasi Penggunaan Dana
          Jenis

                                                                                                                                                                "
                        Tanggal                                                                                                                                                                                                            Sisa Dana Hasil
No.    Penawaran
                                       Jumlah Hasil      Biaya Penawaran
                        Efektif                                                                                                                                                                                                           Penawaran Umum
         Umum                                                                 Hasil Bersih                     Uraian                        Total                                       Uraian                           Total
                                     Penawaran Umum          Umum
                                                                                                                                                                         Seluruh dana yang diperoleh dari hasil
                                                                                               Seluruh dana yang diperoleh dari hasil                                    Penawaran Umum Sukuk ljarah ini,
                                                                                               Penawaran Umum Sukuk ljarah ini,                                          setelah dikurangi biaya-biaya Emisi
                                                                                               setelah dikurangi biaya-biaya Emisi                                       Sukuk ljarah, akan digunakan oleh
                                                                                               Sukuk ljarah, akan digunakan oleh                                         Perseroan untuk melakukan pembayaran
       Sukuk ljarah
1.                    26 Juni 2025     600,000,000,000     3,238,944,965   596,761,055,035      Perseroan untuk melakukan                  596,761,055,035   100.00%     sebagian pokok pinjaman kepada BNI          596,761,055,035.00
      Berkelanjutan
                                                                                               pembayaran sebagian pokok pinjaman                                        yang timbul berdasarkan Fasilitas
                                                                                               kepada BNI yang timbul berdasarkan                                        Pinjaman BNI pada tanggal jatuh
                                                                                               Fasilitas Pinjaman BNI pada tanggal                                       tempo.
                                                                                               jatuh tempo.

      JUMLAH                          600,000,000,000     3,238,944,965      596,761,055,035                                             596,761,055,035     100.00%                                                596,761,055,035.00




                                                                                                                                                                                                                                                             rt·




                                                                                                                                                                                          Jakarta, 12             Januari 2026




                                                                                                                                                                                          Helmy Yusman Santoso
Page 6
PT TOWER BERSAMA INFRASTRUCTURE TBK
BIAYA PENAWARAN UMUM
31 Desember 2025
Sukuk ljarah Berkelanjutan I Tower Bersama Infrastructure Tbk Tahap II Tahun 2025




        Biaya Jasa Penjamin
                    --
                             Emisi Obligasi
                                        --        --
                                                       0.200%      1,200,000,000
                                                                 ---        --
                                                                                        0.200% - 1,200,000,000    0.000%
      2 Biaya jasa Profesi Penunjang
                            -
                                     Pasar
                                       -
                                            Modal   -  0.057%
                                                            --
                                                                     342,616,811!__     0.057%     341,906,081
                                                                                                        -     -
                                                                                                                  0.000% -    -
                                                                                                                                     710,737
      3 Biaya Lembaga Penunjang
                            --
                                   Pasar--
                                         Modal    -- -
                                                       0.076% -      456,818,182        0.076% - 456,818,182
                                                                                                          -   -
                                                                                                                  0.000% -                 (0)
      4 Biaya lain-lain -               --
                                                       0.213%
                                                           -- --
                                                                   1,279,909,091
                                                                    --         -
                                                                                        0.207%   1,240,220,702
                                                                                                --         -
                                                                                                                  0.007% --       39,688,389
                                                     -


                      JUMLAH                             0.547%         3,279,344,091   0.540%   3,238,944,965    0.007%      40,399,126

                                                                                                                                                 ,,
Page 7
PT TOWER BERSAMA INFRASTRUCTURE TBK
Sukuk ljarah Berkelanjutan I Tower Bersama Infrastructure Tbk Tahap II Tahun 2025

No
      Perusahaan
                                                     Fasilitas Pinjaman                           i@@l•Jdhiil ·fflfl3
         Anak                                                                                         Dalam IDR




                                                                                                                                 ,.
                   [E·asilitas pinjaman berg_ulir dari PT Bank Negara lndonesi�Persero) Tbk                         b./bl !..0
�                   JUMLAH                                                                    J                    b./bl .0

File

File Open PDF
Source IDX
Size0.82 MB
Published15 Jan 2026
Pages7
Characters18,634
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 8 people and organisations named in the text · linked when the evidence is strong

linked person Helmy Yusman Santoso p.2 ×2
possible org TOWER BERSAMA INFRASTRUCTURE TBK p.3 ×10
unresolved org Bcrkclanjutan Obligasi Berkelanjutan VII Tower Bersama Infrastructure Tbk p.2
unresolved org Tower Bcrsama Infrastructure Tbk p.2 ×2
unresolved org Obligasi Berkelanjutan VII Tower Bersama Infrastructure Tbk p.3 ×2
unresolved org Berkelanjutan V Tower Bersama Infrastructure Tbk p.4
unresolved org Berkelanjutan I Tower Bersama Infrastructure Tbk p.5 ×3

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result