Skip to content
Back to announcement

20260803_TBIG_Penyampaian Prospektus//Informasi Tambahan_32116945.pdf

Other Text extracted TBIG

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 2

Page 1
Go To English Page

 Nomor Surat                       4412/TBIG-TBI-00/CSI/05/VIII/2026

 Nama Perusahaan                   PT Tower Bersama Infrastructure Tbk

 Kode Emiten                       TBIG

 Lampiran                          1

 Perihal                           Penyampaian Prospektus

Sehubungan dengan Penawaran Umum Perdana, perseroan menyampaikan Prospektus dan/atau Term Sheet yang
telah mendapatkan persetujuan dari Otoritas Jasa Keuangan sebagaimana terlampir.


Informasi Lain

Tambahan Informasi Dan/Atau Perbaikan atas Informasi Tambahan Ringkas Penawaran Umum Berkelanjutan Obligasi
Berkelanjutan VII Tower Bersama Infrastructure Tahap IV Tahun 2026 dan Sukuk Ijarah Berkelanjutan I Tower Bersama
Infrastructure Tahap IV Tahun 2026.



 Demikian untuk diketahui.


 Hormat Kami,
 PT Tower Bersama Infrastructure Tbk




 Helmy Yusman Santoso

 CFO/ Corporate Secretary




 PT Tower Bersama Infrastructure Tbk
 Gedung The Convergence Indonesia, Lt. 11, Kaw. Rasuna Epicentrum, Jl. HR.
 Telepon : +62 21 2924 8900, Fax : +62 21 2157 2015, https://www.tower-bersama.



 Nama Pengirim                     Helmy Yusman Santoso

 Jabatan                           CFO/ Corporate Secretary
 Tanggal dan Waktu                 03-08-2026 10:51

 Lampiran                         1. TBIG7.4 Perbaikan Intam Ringkas 31072026.pdf


 Dokumen ini merupakan dokumen resmi PT Tower Bersama Infrastructure Tbk yang tidak memerlukan tanda tangan
     karena dihasilkan secara elektronik oleh sistem pelaporan elektronik. PT Tower Bersama Infrastructure Tbk
                     bertanggung jawab penuh atas informasi yang tertera didalam dokumen ini.

Page 2
Go To Indonesian Page

 Letter / Announcement No.           4412/TBIG-TBI-00/CSI/05/VIII/2026

 Issuer Name                         PT Tower Bersama Infrastructure Tbk

 Issuer Code                         TBIG

 Attachment                          1

 Subject                             Penyampaian Prospektus

In accordance with the Initial Public Offering, The Issuer had submitted the Company's Prospectus and/or Term Sheet
that has been approved by the Indonesia Financial Service Authority, as attached.


Other Information:

Additional Information and/or Revision to the Abridged Additional Information for the Continuous Public Offering of
Continuous Bonds VII Tower Bersama Infrastructure Phase IV 2026 and Continuous Sukuk Ijarah I Tower Bersama
Infrastructure Phase IV 2026.



Thus to be informed accordingly.


Respectfully,
PT Tower Bersama Infrastructure Tbk




Helmy Yusman Santoso

CFO/ Corporate Secretary




PT Tower Bersama Infrastructure Tbk
Gedung The Convergence Indonesia, Lt. 11, Kaw. Rasuna Epicentrum, Jl. HR.
Phone : +62 21 2924 8900, Fax : +62 21 2157 2015, https://www.tower-bersama.com



Sender Name                          Helmy Yusman Santoso

Function                             CFO/ Corporate Secretary

Date and Time                        03-08-2026 10:51

Attachment                          1. TBIG7.4 Perbaikan Intam Ringkas 31072026.pdf


    This is an official document of PT Tower Bersama Infrastructure Tbk that does not require a signature as it was
       generated electronically by the electronic reporting system. PT Tower Bersama Infrastructure Tbk is fully
                             responsible for the information contained within this document.


File

File Open PDF
Source IDX
Size0.01 MB
Published3 Aug 2026
Pages2
Characters3,372
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 3 people and organisations named in the text · linked when the evidence is strong

linked person Helmy Yusman Santoso · CFO/ Corporate Secretary p.1 ×5
possible org Tower Bersama Infrastructure Tbk · Nama Perusahaan p.1 ×21
possible org Otoritas Jasa Keuangan p.1

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result