Skip to content
Back to announcement

20251219_DEWA_Public Expose_32014555_lamp2.pdf

Other Text extracted DEWA

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 37

Page 1
PT Darma Henwa Tbk
2025 Public Expose Presentation




www.ptdh.co.id
Page 2
2025 Highlights

                                          Recent Development
                                      3   & Fleet Expantion



           Industry Overview                                    Operational Performances &
      2    & Corporate Strategy                                 GMR Progress Update          4




                                                                Financial Performances
  1       Darma Henwa at a Glance                               & Loan Facility          5




                                  6   Awards, Certification &
                                               CSR
Page 3
Darma Henwa at a Glance
               PT Darma Henwa Tbk is a general mining contractor        OB Removal
               service public company, founded in 1991. We provide      9M25
               integrated mining services including:

               • coal and mineral mining services



                                                                        101.19
               • mining infrastructure & other supporting activities

               • port management services

Total Asset    The company was listed on the Indonesia Stock Exchange   Million Bcm
1H25           on September 26, 2007, with the stock code DEWA`
                                                                        Coal Mining
                                                                        9M25
                                                         Total

10.04                                                    Employee


                                                                        12.47
                                                         1H25


                                                        3.300
IDR Trillion

                                                                        Million Ton


                                          Client Portfolio
Page 4
Our Transformation Progress
Resetting the Foundation, Scaling the Future



                                                           2023 - 2025                              2026 - …
                  … - 2023
                                                      Rewritting the                         Reshaping the
                 The past
                                                         Future                                 Future


• A traditional mining services contractor   • A strategic turnaround and rebuilding   • Transitioning toward scalable and
• Limited fleet ownership                      fundamental                               sustainable growth
• high reliance on subcontractors            • Strengthened financial structure and    • Building an integrated, technology-
• Operational fragmentation & margin           liquidity                                 enabled mining services group
   volatility                                • Expanded in-house fleet capacity and    • Focus on productivity uplift, ESG
• Balance sheet pressure constrained           operational control                       integration, and capital efficiency
   scalability and growth                    • Improved cost efficiency, execution     • Targeting structural margin
                                               discipline, and governance                improvement and long-term value
                                             • Restored performance stability and        creation
                                               stakeholder confidence
© PT DH, Tbk                                                                                                                   4
Page 5
               Industry Overview &
               Corporate Strategy


© PT DH, Tbk                         5
Page 6
                                                         Industry Overviews
         Macroeconomic easing and normalized coal prices support a more stable operating environment

        Interest Rates & Inflation (%)                        Coal Historical Data (USD)           Coal Demand Updates:

    FED rate   BI Rate   US Inflation   ID Inflation                  Newcastle    HBA             • Coal demand remains supported by India
                                                        450
10,0%                                                                                                and China power generation, despite
                                                       400
9,0%                                                                                                 global energy transition
8,0%                                                    350
                                                                                                   • Price normalization reflects      supply
 7,0%
                                                       300                                           discipline, not demand collapse
6,0%
                                                        250
5,0%
4,0%                                                   200
3,0%
                                                        150                                        Key Takeaways for Mining Service:
2,0%
 1,0%
                                                        100                                        • Favourable rate environment supports
0,0%                                                    50
                                                                                                     capital efficiency
        Jan 24
        May 20



        May 21
         Sep 21

        May 22



        May 23



        May 24



        May 25
         Jan 21
        Jan 20

        Sep 20




        Jan 22

        Sep 22
        Jan 23

        Sep 23




        Jan 25
        Sep 24




                                                         0                                         • Coal price stability supports long-term
                                                              2019 2020 2021 2022 2023 2024 2025     contract execution
• Monetary easing in Indonesia reduces                 • Following the 2021–2022 Supercycle,       • Industry rewards scale, fleet ownership,
  funding pressure and supports capital-                 coal prices have normalized, creating a     and cost discipline
  intensive operations.                                  more predictable planning environment
                                                         for mining contractors
Page 7
                       DH’s Strategic Pillars to Re-shape our Future
                             The blueprints to shape our future by design




                                                                                 
                                 Cultural &
  Transformation                                         Technology &            Long-Term
                               Organizational
        2.0                                               Innovation            Perspectives
                                   Shift

• Expanding clients          • Shift to               • Technology as a      • Setting new
  base & Scaling               independence and         force multiplier       purpose that
  beyond mining                accountability                                  changes how the
  service                                             • Data-driven            Company impacts
                             • Build a high-            decision making        its stakeholder
• Transition from              performance              across operations    • Preparing for future
  diesel to electric           organization with                               challenges &
  heavy equipment              strong execution       • Deployment of IoT,
                                                                               opportunity
                                                        AI, Automation and
• Building long-term         • Leadership and           analytics to         • Bold & Proactive
  cost efficiency and          winning mindset at       enhance                leadership shaping
  productivity.                every level              productivity           a better trajectory.
Page 8
               Recent Development


© PT DH, Tbk                        8
Page 9
1st EGMS : 13th February 2025:
IDR 1.4 Trillion Debt to Equity Conversion (NPR)


EGMS held on February 2025 gave approval for DH to converts
IDR 1.4 trillion debt to 18.83 billion shares at IDR 75.-/share
from:

• Madhani Talatah Nusantara “MTN” – IDR 757 Billion

• Andhesti Tungkas Pratama “ATP” – IDR 359 Billion

• Antareja Mahada Makmur “AMM” – IDR 297 Billion



Thus improving

• Debt-to-equity ratio from 1,32x to 0,62x.

• Current Ratio from 0,70x to 1,11x
Page 10
2nd EGMS : 30th April 2025
Change of PMA to PMDN & Asset Pledge as Guarantees


DEWA convened 2nd EGMS and receive shareholders        These agendas are carried out in compliance with the
approval for the following agenda:                     provisions of Article 102 of Law Number 40 of 2007
                                                       concerning Limited Liability Companies (UUPT) and
1.   Approval of the change in the Company's status
                                                       Article 12 Paragraph (5) as well as Article 15
     from a Foreign Investment Company (PMA) to a
                                                       Paragraph      (2)   of   the   Company's   Articles   of
     Domestic Investment Company (PMDN);
                                                       Association.
2. Approval for the pledge of the Company's assets
     and/or wealth amounting to more than 50% of the
     Company's net assets in connection with loan
     facilities for the Company.
Page 11
AGMS & 3rd EGMS : 30th June 2025
Amendment of AoA to align with KBLI & OJK’s Regulatory updates


DEWA convened AGMS to request shareholders approval        DEWA convened 3rd EGMS to request shareholders
for the following agenda:                                  approval for the following agenda:

1.   Annual Report 2024 Approval                           1.   amendments to the Articles of Association, aligning with
                                                                the Indonesian Standard Industrial Classification (KBLI)
2.   Ratification of Annual Audited Financial Report.
                                                                and recent updates to Financial Services Authority
3. Authorize Board of Commissioners to set 2025 Boards          (OJK) regulations.
     remunerations.
                                                                         AGMS & 3rd EGMS was held on:
4.   Appointment of Public Accountant Firm.
                                                           Day/Date : Monday, 30th June 2025
5. Approval for Board structure’s Changes/re-appointment   Time       : 02:00 P.M. – 04:30 P.M.

                                                           Place      : Financial Hall Jakarta
                                                                        Graha CIMB Niaga 2nd Floor
                                                                        Jl. Jend. Sudirman Kav. 58
                                                                        South Jakarta
Page 12
4th EGMS – September 30th 2025
Strengthening Board Members
 Joseph Lembayung – Director

 IT leader with 24+ years in digital transformation, IT, and corporate
 strategy across telco, mining, ICT, and media; former Chief IT at
 PAMA; MBA, NUS Singapore.

 Wisnu Wahyudin Pettalolo – Commissioner

 Executive with 16+ years in business development, mining, logistics,
 transport, smelters, and trading; currently President Director of Gayo
 Mineral Resources (gold asset).

 Sorimuda Pulungan – Commissioner

 Mining professional with 30+ years’ experience in mining and services;
 former President Director of BUMA; holds a Doctorate in Economics.                   4th EGMS was Held on:

 Agus Suharyono – Independent Commissioner                                Day/Date : Tuesday / 30th September 2025
                                                                          Time     : 02:00 P.M. – 03:00 P.M.
 Former senior SOE official with 32+ years at Indonesia’s Ministry of
 SOEs and 12+ years as Director/Commissioner in major SOEs; Master’s      Place    : Financial Hall Jakarta
 in Agricultural Economics, University of Maine.                                    Graha CIMB Niaga 2nd Floor
                                                                                    Jl. Jend. Sudirman Kav. 58
Page 13
5th EGMS – September 30th 2025
Strengthening Board Members & Governance

                     5th EGMS
                                                    The Company will convene its 5th Extraordinary General
Day/Date         : Wednesday / 24th December 2025   Meeting of Shareholders (EGMS) on Wednesday, 24
                                                    December 2025, at the Financial Hall Jakarta, Graha
Time             : 02:00 P.M. – 03:00 P.M.          CIMB Niaga.
Place            : Financial Hall Jakarta           The meeting will address key corporate governance
                  Graha CIMB Niaga 2nd Floor        matters, including the appointment of a new Public
                                                    Accountant and the changes and/or re-appointment of
                  Jl. Jend. Sudirman Kav. 58
                                                    members of the Board.
                                                    These agendas are part of the Company’s ongoing
Key Agendas:                                        commitment to maintaining strong governance
• Appointment of a New Public Accountant            practices, ensuring regulatory compliance, and
                                                    supporting the continuity of effective leadership in line
• Changes and/or Re-appointment of Board Members
                                                    with Darma Henwa’s long-term strategic direction.
Page 14
Share Buyback
Enhancing Shareholder Returns and Investor Confidence


• Buyback Period : 19 November 2025 – 19 February 2026

• Estimated Buyback Budget : Up to IDR 950 billion

• Realization as of 19 December 2025 : IDR 160 billion (372 Mn. Shares)


      Description         Before Buyback                      After Buyback

  Total Asset (IDR)      10.043.486.585.000 950.000.000.000   9.093.486.585.000

  Total Equity (IDR)      4.887.622.383.000 950.000.000.000   3.937.622.383.000

  Rofit For The
                           168.007.800.000                      168.007.800.000
  Current Period (IDR)
  Basic Earning Per
                                       4,13               -                   4,59
  Shares (IDR)




        © PT DH, Tbk                                                                 14
Page 15
               Fleet Expansion


© PT DH, Tbk                     15
Page 16
1st Batch Fleet Expansion Update

The company has installed the following new
equipment from late 2024 and early 2025:


• 8 (eight) 200T-Class Excavator
• 1 (one) 120T-Class Excavator
• 75 (seventy-five) 100T-Class Trucks
• 12 (twelve) Dozers
• 7 (seven) Motor Graders
• 48 (forty-eight) Other supporting Eq.


Which adds up to 30 - 35 Mbcm per annum
of DH own fleet operating capacity
Page 17
2nd Batch Fleet Expansion Update: XCMG Fleet
Full operations achieved by End of September


2nd Batch Fleet Expansion units:

• 4 units 200T-Class Excavator (XE2000)

• 2 units 120T-Class Excavator (XE1250)

• 35 units 130T-Class Dump Trucks (XDE130)

The 2nd batch of fleet expansion boost internal earth
moving capacity per annum by up to 25-30 Mbcm.



Key Updates :

All Heavy Equipment are fully operational by end of
September 2025, advancing from the initial October
2025 schedule.



        © PT DH, Tbk                                    17
Page 18
2025 Fleet Expansion Update
Internal fleet ramp-up are on track
                Bengalon Project OB Production Projection by Fleet                                 Effective Working Hour Projection by Fleet (hr)
 20
                                     (mbcm)                 18,58                     12.000
                                                                                                                         9.898
                                                                                                                                          9.118          9.322
                                 14,47               14,23              4,32          10.000
  15                                                                                                 7.661
               12,04                                 0,70                              8.000                             6.403                           6.726
                                                                                                                                          6.057
                                                                                                     5.550
  10                                                                                   6.000
                                 7,97                7,34               7,48
               6,44                                                                    4.000                                                             3.579
   5
                                                                                       2.000                                              1.114
               5,60              6,50                6,19               6,78                          0                   0
   0                                                                                       0
               Q1 A             Q2 A                 Q3 A              Q4 F                          Q1 A                Q2 A             Q3 A           Q4 F

                       Old DH Fleet      BCA Fleet    XCMG Fleet                                          Old DH Fleet        BCA Fleet     XCMG Fleet



                                                                               Key Updates:
                                                        •    BCA Fleet (Batch 1) delivered 6.4 mbcm in Q1 &
                                                             7.97 mbcm in Q2 & 7.34 mbcm of OB production.

                                                        •    XCMG Fleet (Batch 2) delivered 0.7 mbcm in Q3
                                                             and projected to deliver up to 4.32 mbcm in Q4 of
                                                             OB production.

                                                        •    Adverse weather delays in Q3 (+44% budget)
                                                             temporarily affected full operational deployment

                                                        •    All fleets expected to operate at full capacity by
                                                             Q4 , breaking internal record of quarterly own-fleet
                                                             production levels.
© PT DH, Tbk                                                                                                                                                     18
Page 19
               GMR Progress Update


© PT DH, Tbk                         19
Page 20
GMR - Gold & Copper Asset Progress Report
Gayo Mineral Resources (GMR) Strategic Perspective




 Latest Update on Gayo Mineral Resources

 • GMR received a letter from the Ministry of Energy and Mineral Resources (ESDM) No. T-462/MB.04/MEM.B/2025 dated 14
   October 2025 regarding the Approval of Changes in Share Ownership of PT Gayo Mineral Resources.

 • PT Gayo Mineral Resources (GMR) subsequently received a Notification Letter from the Ministry of Law, Ref. No. AHU-
   AH.01.09-0359755, confirming the acceptance of the notification on changes to the corporate data of PT Cayo Mineral
   Resources dated 27 November 2025.




© PT DH, Tbk                                                                                                         20
Page 21
GMR Current Exploration Activity
End-to-End Exploration Efforts to Unlock Gold & Copper Potential




               Exploration                 Core-shed               Geotechnical
                 Drilling                   Activity               Measurement




               Hydrology                 Rehabilitation              Laboratory:
                 Test                      Planting                Crusher & Oven
© PT DH, Tbk                                                                        21
Page 22
               Operational Performances


© PT DH, Tbk                              22
Page 23
Good Mining Practice Implementation
Unlocking Productivity Through Engineering-Based Pit Optimization

               Darma Henwa is committed to implementing Good Mining Practices across all project sites

 Key activities include optimizing pit staging, improving mining sequences, strategically designed waste dumps
 and haul roads, efficient sump management, and road surface layering. The implementation of these practices
 has increased hauling speed, reduced cycle time, and enhanced overall productivity and fleet utilization.


                    Before Implementation                                   After Implementation
                                                                    Strategically          Standardized   Optimized
                                                                   designed access         Loading Area   Pit Staging




                                                                                                             Efficient sump
                                                                                                             management




                                                                                 Smooth & Straight
                                                                                    Haul Road




© PT DH, Tbk                                                                                                                  23
Page 24
9M25 Consolidated Operational Performances
Solid volume growth across key operational metrics
            Waste Removal (mbcm)                               Coal Mining (mt)                             Material Moved (mbcm)
  120,00                                            14,00                                          120,00


                                                    12,00                                                        108,57         110,78
  100,00                                                        12,33             12,47            100,00
                99,09             101,19
                                                    10,00
   80,00                                                                                            80,00

                                                    8,00
   60,00                                                                                            60,00
                                                    6,00

   40,00                                                                                            40,00
                                                    4,00

   20,00                                                                                            20,00
                                                    2,00


        -                                              -                                               -
                9M-2024          9M-2025                       9M-2024          9M-2025                          9M-2024       9M-2025



• Waste removal in 9M 2025 reached 101.19          • Coal mining in 9M 2025 reached 12.47 mt,     • Material moved in 9M 2025 reached 110.78
   mbcm, reflecting a 2.12% increase compared to     reflecting a 1.14% increase compared to 9M     mbcm, reflecting a 2.04% increase compared
   9M 2024                                           2024                                           to 9M 2024



© PT DH, Tbk                                                                                                                                24
Page 25
9M25 DH Fleet Operational Performances
Solid volume growth across key operational metrics
           DH Waste Removal (mbcm)                           DH Coal Mining (mt)                          DH Material Moved (mbcm)
  80,00                                           10,00                                           80,00

                                                   9,00
  70,00
                                                                                 9,10             70,00                         74,36
                                67,36              8,00            41.74%
                                                                                                                     59.64%
  60,00                                                                                           60,00
                     61.73%                        7,00
  50,00                                                                                           50,00
                                                   6,00        6,42
                                                                                                                 46,58
  40,00                                            5,00                                           40,00
                 41,65
                                                   4,00
  30,00                                                                                           30,00
                                                   3,00
  20,00                                                                                           20,00
                                                   2,00
  10,00                                                                                           10,00
                                                   1,00

       -                                             -                                               -
                9M-2024        9M-2025                       9M-2024           9M-2025                          9M-2024        9M-2025



• DH Waste removal in 9M 2025 reached 67.36      • DH Coal mining in 9M 2025 reached 9.10 mt,    • DH Material moved in 9M 2025 reached 74.36
   mbcm, reflecting a 61.73% increase compared     reflecting a 41.74% increase compared to 9M     mbcm, reflecting a 59.64% increase compared
   to 9M 2024                                      2024                                            to 9M 2024



© PT DH, Tbk                                                                                                                                25
Page 26
9M25 Operational Performances by Fleet
Strategic shift toward internal capacity
                   9M25 Material Moved (mbcm)

                           DH   Subcont
          120,00                          110.78
                      108.57
                                                    • DH Fleet material moved in 9M 2025 reached 74.36 mbcm,
                       61,99               36,42
          100,00                                      reflecting a substantial 59.64% increase compared to 9M 2024

                                                    • Subcontracted fleet material moved in 9M 2025 reached 36.42
           80,00
                                                      mbcm, reflecting a 41.25% decrease compared to 9M 2024
                                           74,36

           60,00
                                                    • Total material moved in 9M 2025 reached 110.78 mbcm,
                                                      reflecting a 2.04% increase compared to 9M 2024

                       46,58
           40,00                                    • Significant DH Fleet internal capacity development


           20,00




               -
                      9M-2024             9M-2025

© PT DH, Tbk                                                                                                         26
Page 27
               Financial Performances


© PT DH, Tbk                            27
Page 28
1H25 Income Statement
Boosted Profitability Through Revenue Growth, Cost Efficiency and In-House Operations
               Revenue (IDR billion)                          Gross Profit (IDR billion)                         Gross Profit Margin
                                                                                                                         (%)
 3.500                                                600
                                                                                                          18
 3.000                             3.108,83           500                                                 16
                 2.920,65
                                                                                      476,43                                              15,33
 2.500                                                                                                    14
                                                      400
                                                                           119.15%                        12                  7,89%
 2.000
                                                      300                                                10

  1.500                                                                                                   8
                                                      200         217,40                                              7,44
                                                                                                          6
  1.000
                                                                                                          4
                                                      100
   500
                                                                                                          2

       0                                                0                                                 0
                 1H-2024           1H-2025                       1H-2024              1H-2025                       1H-2024             1H-2025



• Revenue in 1H 2025 amounted to IDR 3,108.83        • Cost of Revenue in 1H 2025 drecrase 2.62%         • Gross Profit Margin in 1H 2025 reached 15,33%,
                                                       compared to 1H 2024
   billion,    representing   a   6.44%   increase                                                         increase compared to 7.44% in 1H 2024.
                                                     • Gross Profit in 1H 2025 amounted to IDR
   compared to 1H 2024                                 476.43 billion, representing a 119.15% increase
                                                       compared to 1H 2024

© PT DH, Tbk                                                                                                                                        28
Page 29
1H25 Income Statement
Record-Breaking Profitability Driven by Operational Leverage
                       Net Income (IDR billion)                               EBITDA (IDR billion)
                180                                              900

                160                            168,01            800
                                                                                                     821,21

                140                                               700
                                                                                    100.09%
                120                                              600

               100                                               500

                80              1,075.72%                        400
                                                                                410,41
                60                                               300

                40                                               200

                20                                                100
                              14,29
                 0                                                  0
                          1H-2024             1H-2025                          1H-2024              1H-2025



               • Net Income in 1H 2025 amounted to IDR 168.01    • EBITDA in 1H 2025 amounted to IDR 821.21
                 billion, representing a 10x increase compared     billion,   representing    a   100.09%     increase
                 to 1H 2024                                        compared to 1H 2024



© PT DH, Tbk                                                                                                             29
Page 30
Balance Sheet
Stronger Balance Sheet with Improved Liquidity, Asset Base, and Equity Position




                                      10.043,49   5.155,86      +82%                        +24%
               8.806,36   5.495,55
                                                                1H25: IDR 632 B            1H25: IDR 4,243 B

                                                              Cash & Cash Eq.               Fixed Asset
                                                  4.887,62


                          3.310,81


                                                                             +48%
                Asset          - &
                          Liability    Asset           - &
                                                  Liability
                            Equity                  Equity                  1H25: IDR 4,888 B


               31 December 2024          30 June 2025
                                                                                  Equity



© PT DH, Tbk                                                                                                   30
Page 31
Capex 2025
Capex Increased, Focused on Heavy Equipment Investment

                   Capex 1H 2025 Vs. 2024
               1

                                        1,14

               1



               1
                                                Capex YtD 1H-2025 was higher than
                                                2024 figure, with the majority
               1
                                                allocated to the purchase of new
                                                heavy equipment
               0



               0


                      0,10
               0
                    1H-2024           1H-2025




© PT DH, Tbk                                                                        31
Page 32
               Loan Facility


© PT DH, Tbk                   32
Page 33
Securing Loan Facility From BCA
Strengthened Capital Structure to Support Growth and Execution

                                                                                              &
On December 19th, 2025                                                   On July 29th, 2025
Credit Investment and Working Capital Facility details:                  •   Working Capital Facility details:
         •     Lenders      : Bank BCA                                         •   Lenders    : Bank BCA & OK Bank + (Potential: Amar
                                                                                   bank & ICBC)
         •     Amount       : IDR 1 trillion (One Trillion Rupiah) –
               Credit Investment & Working Capital                             •   Amount       : IDR 350 billion (Three Hundred Fifty
                                                                                   Billion Rupiah) + Accordion Option up to IDR 500
         •     Tenor        : 2 years working capital & 5 (five) years             billion
               credit investment
                                                                               •   Tenor        : 2 (two) years
         •     Interest     : 90 days compounded rate + margin
               (effective 7% per annum)                                        •   Interest      : 90 days indoNIA + 2.817% margin
                                                                                   (effective 8.3% per annum)
                                                                               •   Objective    : Support ongoing project execution and
                                                                                   operational scalability




© PT DH, Tbk                                                                                                                          33
Page 34
               Awards, Certification & CSR


© PT DH, Tbk                             34
Page 35
         Awards & Certifications
                                                      ISO 9001:2015 Certification
                                                                           Quality Management System
                 Certified for meeting international standards in quality management, ensuring consistent
                            service delivery and continuous improvement across all operational processes
                                                                                                                  01

                           ISO 14001:2015 Certification
                                        Environmental Management System
Recognized for our commitment to sustainable environmental practices, including
     waste reduction, compliance with environmental regulations, and proactive
                                                                                                             02
                                                       resource management



        ISO 45001:2015 Certification
    Occupational Health and Safety Management System
Certified for implementing robust systems to ensure workplace
safety, risk prevention, and health protection for all employees
                                                                                              03
                                                 across our sites



Penghargaan Utama Good Mining Practice
                                    Award for Excellence in Mining Practices
         Granted by the Ministry of Energy and Mineral Resources for exemplary
             compliance with mining governance, operational transparency, and
                                                                                                             04
                                                       sustainability standards.



            Penghargaan Kecelakaan Nihil Tahun 2024 untuk
                     Proyek Bengalon & Proyek Asam-asam
                                                                           Zero-Accident Award 2024
                                                                                                                  05
              Awarded for achieving zero workplace accidents in 2024 at both Bengalon and Asam-asam
                            projects, demonstrating outstanding safety culture and effective risk control.
Page 36
                                            Corporate Social Responsibility




• DARMA CERDAS                                      • DARMA MANDIRI                                      • DARMA SOSIAL
In commemoration of the 2025 National               PT Darma Henwa Tbk carried out CSR activities        PT Darma Henwa Tbk provided social assistance for
Occupational Safety and Health Month (BK3N), PT     including a melon harvest with the Setuju farmer     flood victims in Kurau–Bati Batu and received the
Darma Henwa Tbk conducted a series of activities,   group and the distribution of seven goats in Bukit   Zero Accident Award (Gold) for its zero-accident
including a school visit to SMA Negeri 2 Jorong     Mulia Village.                                       achievement and HIV/AIDS prevention efforts in
through the Rescue Goes to School program, as                                                            South Kalimantan.
well as DH Teaching psychoeducation and PMI
training at SMAN 2 Kintap, South Kalimantan.
Page 37
Thank you
  End-Of-Presentation

File

File Open PDF
Source IDX
Size4.04 MB
Published19 Dec 2025
Pages37
Characters40,682
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 17 people and organisations named in the text · linked when the evidence is strong

linked org Darma Henwa Tbk p.1 ×16
linked org Madhani Talatah p.9
linked person Andhesti Tungkas Pratama p.9
linked org Antareja Mahada p.9
linked person Joseph Lembayung p.12
linked person Wisnu Wahyudin p.12
linked person Sorimuda Pulungan p.12
linked person Agus Suharyono p.12
unresolved org Indonesia Stock Exchange p.3
unresolved org PT DH p.4 ×23
unresolved org Financial Services Authority p.11
unresolved org Ministry of SOEs p.12
unresolved org Ministry of Energy and Mineral Resources p.20 ×2
unresolved org PT Gayo Mineral Resources. p.20 ×2
unresolved org Ministry of Law p.20
unresolved org PT Cayo Mineral Resources p.20
unresolved org Bank BCA p.33 ×2

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result