Source file signed link, expires in 15 minutes
Extracted text 12
Page 1
No. JRAP/SKLR/CSD/2025/XII/148 Jakarta, 18 Desember 2025 Lampiran: Materi Public Expose Kepada Yth. PT Bursa Efek Indonesia Gedung Bursa Efek Indonesia Tower I Jl. Jend. Sudirman Kav. 52-53 Jakarta 12190 Up : Direktur Pencatatan Perusahaan Perihal : Penyampaian Materi Public Expose PT J Resources Asia Pasifik Tbk (“Perseroan”) Dengan hormat, Kami merujuk pada surat kami No. JRAP/SKLR/CSD/2025/XII/143 tanggal 8 Desember 2025 tentang Public Expose PT J Resources Asia Pasifik Tbk, bersama ini kami sampaikan materi Public Expose Perseroan sebagaimana terlampir, yang akan diadakan pada hari Selasa, tanggal 23 Desember 2025. Demikian kami sampaikan. Atas perhatiannya kami ucapkan terima kasih. Hormat kami, PT J Resources Asia Pasifik Tbk Tembusan: Kepala Divisi Pencatatan Perusahaan Group I (dengan Lampiran)
Page 2
PUBLIC EXPOSE 2025 PT J RESOURCES ASIA PASIFIK TBK
Page 3
Section 1 Operations
Page 4
Bakan Production
Page 5
Penjom UG Potential In pit Reserve at 171 Koz Most of remaining in situ Resources of 1,171 Koz (of H-4, H-5 and H-6) are located below the Kelampong Open Pit Kelampong Pit mining was started in 1996 and stopped in 2019 Better understanding of geological control of Penjom’s Mineralization is lead to any potential “repeated sequences” below the Open Pit Penjom Underground “High Level” study is done
Page 6
Penjom UG Potential
Penjom VS Tanami
Dead Bullock Soak UG Deposit
Deposit Name Penjom Tanami
Location Malaysia Northern Teritory, Australia
Structural control by Penjom shear, a NE trending shear Splays of N-S Raub Structural control by Tanami Fault, N-S to NW trending networking
Tectonic Setting
Bentong Suture, structures, and several thrusted; Tanami Fault,
Geological Setting
Host rock Sedimentary unit and younger felsic intrusions (Tonalite) Hostrock sedimentary rock, and felsic rock (Granite)
Deposit Type Orogenic Gold Orogenic Gold
Quartz vein, Quartz Carbonate veins stockwork and network, metamorphism
Quartz vein, Quartz Carbonate veins stockwork and network.
Alteration host rock, with thin alteration halo of quartz-sericite (phyllitic) and bleached
metamorphism host rock and Minor alteration
out
Vein System, Quartz veins-carbonate–sulfide ± Au, Mineralization typically Vein System, Au–carbonate–sulfide ± quartz
Mineralization Style
lenses, quartz veins has ribbon textures to massive, milky to crystalline. Veins. Mineralization typically have a plate-like, ellipsoidal shape,
2km strike length, up to 60 m width at below Penjom shear, and up to 50m
Up to 2 km long strike length. Up to 50 m wide, Depth extents
Mineralization Footprint width following structures and within Tonalite intrusion body or wallrock.
traced for over 2–3 km of vertical, extent in some deposits
Approx. 500m down-plunge from drilling data,
2018 Resource outside Reserve (MII) : 14.7 Mton @ 4.53 gpt Au 2.3
Resources Underground Potential : 9.7 Mton @ 3.21 g/t Au 1,002 Koz
Moz
Reserves 3.175 Mton @ 3.52 g/t Au 332 koz 26.6 Mton @ 5.51 gpt Au ~ 4.69 Moz
References www.jresources.com https://miningdataonline.com/
500m Penjom Present depth
2,000m
Potential Mineralization Extension
Looking N
Page 7
Penjom UG Potential
Penjom VS Dalgaranga
Dalgaranga Deposit
Deposit Name Penjom Dalgaranga
Location Malaysia Western Australia
Structural control by Penjom shear, a NE trending shear Splays of N-S Structural control by Dalgaranga Fault, N-Etrending networking
Tectonic Setting
Raub Bentong Suture, structures, dipping to N-W,
Geological Setting
Host rock Sedimentary unit and younger felsic intrusions (Tonalite) Hostrock sedimentary rock, and felsic rock (Granite)
Deposit Type Orogenic Gold Orogenic Gold
Quartz vein, Quartz Carbonate veins stockwork and network,
Quartz vein, Quartz Carbonate veins stockwork and network.
Alteration metamorphism host rock, with thin alteration halo of quartz-sericite
metamorphism host rock and Minor alteration
(phyllitic) and bleached out
Vein System, Quartz veins-carbonate–sulfide ± Au, Mineralization Vein System, Au–carbonate–sulfide ± quartz
Mineralization Style typically lenses, quartz veins has ribbon textures to massive, milky to Veins. Mineralization typically have a plate-like, ellipsoidal
crystalline. shape,
2km strike length, up to 60 m width at below Penjom shear, and up to
Up to 1.8 km long strike length. Up to 50 m wide, Depth extents
Mineralization Footprint 50m width following structures and within Tonalite intrusion body or
traced for over 1 km of vertical, extent in some deposits
wallrock. Approx. 500m down-plunge from drilling data,
2024 Resource Indicated (II) : 22.3 Mton @ 4.39 gpt Au 3.1 Moz
Resources Underground Potential : 9.7 Mton @ 3.21 g/t Au 1,002 Koz
UG Resources : 15.14 Mton @5.79 g/t Au 2,821.2 Koz
Reserves 3.175 Mton @ 3.52 g/t Au 332 koz -N/A
References www.jresources.com https://spartanresources.com.au/projects/mineral-resources/
1000 m
1,000 m
Potential Mineralization Extension
Looking N
Page 8
Section 2 Financials
Page 9
Debt Profile
The Company is undertaking a strategic deleveraging initiative to
strengthen its capital structure, which includes the full repayment of
all IDR Bond obligations.
On 21 October 2025, the Company has fully repaid its remaining
IDR Bond outstanding amounting to a USD equivalent of
US$32,524,790 as shown below:
Description O/S December 2024 O/S September 2025
Bond 1 Phase 3 Rp 441,478,750,000 Rp 213,618,750,000
Bond 1 Phase 4 Rp 174,375,000,000 Rp 84,375,000,000
Bond 1 Phase 5 Seri B Rp 244,125,000,000 Rp 118,125,000,000
Bond 1 Phase 6 Seri B Rp 126,394,750,000 Rp 126,394,750,000
Total Rp 986,373,500,000 Rp 542,513,500,000
7
Page 10
Debt Profile
The Company’s estimated total debt by the end of 2025 is
US$248,864,550, representing a decrease of US$73,462,068
compared to the end of December 2024.
Total Debt
December 2024 (A) $ 322,326,618
September 2025 (A) $ 282,163,921
December 2025 (E) $ 248,864,550
8
Page 11
2025 Target
The Company’s operational target for 2025 includes 86,000oz of production and sales,
at an average selling price of US$3,300/oz. These metrics are expected to deliver
approximately US$286 million in revenue
Production (oz) 86,000
Sales (oz) 86,000
ASP $ 3,330*
Sales (US$) $ 286,380,000
*ASP: total average selling price of both Bakan and Penjom (selling gold concentrate at a ~30% discount)
9
Page 12
Thank You PT J Resources Asia Pasifik Tbk Equity Tower, 48th Floor SCBD, Lot.9 Jl. Jenderal Sudirman, Kav 52-53 Jakarta Selatan T +6221-515 3335 F +6221-515 3579 Email: corpse@jresources.com www.jresources.com
Names mentioned 2 people and organisations named in the text · linked when the evidence is strong
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
No extraction attempted yet.