Source file signed link, expires in 15 minutes
Extracted text 19
Page 1
PUBLIC EXPOSE
19 December 2025
1
Page 2
BUSINESS OVERVIEW
Tinjauan Bisnis
2
Page 3
GROUP STRUCTURE
Struktur Grup Usaha
Wilton Resources Corporation Limited
(Listed in SGX, Stock Code 5F7)
100.0%
Wilton Resources Holdings Pte. Ltd.
(Singapore)
54.2% * 100%
PT. Wilton Makmur Indonesia Tbk. Wilton Assets Management Ltd
(Listed in IDX, Stock Code SQMI) (Malaysia)
99.0%
PT. Wilton Investment Mr Wijaya Lawrence
(Indonesia) 1.0%
99.0%
PT. Wilton Wahana Indonesia
(Indonesia) 1.0% Operation Production Mining Licence (IUP OP)
Holders of two Concession Blocks
99.0% Pemegang 2 Konsensi IUP Operasi-Produksi
(“Ciemas Gold Project”)
PT. Liektucha Ciemas
(Indonesia) 1.0%
* as of November 30, 2025
Page 4
MINING PERMITS and CLEAR & CLEAN CERTIFICATIONS
Ijin Usaha Pertambangan dan Sertifikat Clear & Clean
Items PT. Wilton Wahana Indonesia (“PT. WWI”) Clear & Clean Certification – PT. WWI
IUP No. 503.8/7797-bppt/2011
Issued To PT Witon Wahana Indonesia
Issued By Integrated Licensing Services Board Administration of Sukabumi District
Issue Date 5 October 2011
Expiry Date1 7 September 2030
Area (km2) 28.785 km2
Permit Type Exploration, mining, construction, production, transportation, and sale
Items PT. Liektucha Ciemas (“PT. LTC”)
Clear & Clean Certification – PT. LTC
IUP no. 503.8/3106-bppt/2012
Issued to PT Liektucha Ciemas
Issued by Integrated Licensing Services Board Administration of Sukabumi District
Issue date 8 May 2012
Expiry date1 4 January 2028
Area (km2) 2.00 km2
Permit Type Exploration, mining, construction, production, transportation, and sale
1 Can be extended two times (twice) pursuant to Mining Law No.4 of 2009.
Page 5
BOARD OF COMMISSIONERS
Dewan Komisaris
Mr. Wijaya Lawrence Mr. Mohammad Raylan
President Commisioner Independent Commisioner
Komisaris Utama Komisaris Independen
Page 6
BOARD OF DIRECTORS
Direksi
Mr. Oktavia Budi Raharjo Mr. Andrianto D. Lawrence Mr. Chia Wei Yang (Ethan)
President Director Director Director
Direktur Utama Direktur Direktur
Page 7
SUPPORTING PROFESSIONALS
Profesi Penunjang
• Corporate Sponsor of Wilton Resources Corporation Limited (SGX: 5F7) – ZICO Capital Pte Ltd
• External Auditors – PKF Global
• Singapore Company Secretary - InCorp, Singapore Legal – SLB, Indonesian Legal – Dentons HPRP
• Indonesian Share Custodians – UOB Kay Hian Sekuritas, NH Korindo Sekuritas, Valbury Sekuritas
Page 8
SUPPORTING TECHNICAL PROFESSIONALS
Profesi Penunjang Teknis
• Resources & Reserves (IQPR; compliance to JORC 2012)
• Valuations
Page 9
FINANCIAL OVERVIEW
Tinjauan Keuangan
9
Page 10
Interim Consolidated Statements of Financial Position Laporan Posisi Keuangan Konsolidasian Interim
Page 11
Interim Consolidated Statement of Profit or Loss and Other Comprehensive Income Laporan Laba Rugi dan Penghasilan Lain Konsolidasian Interim
Page 12
PROGRESS OF
CIEMAS GOLD PROJECT
Perkembangan
Ciemas Gold Project
12
Page 13
MASTER PLAN OF THE 500 TPD FLOTATION AND CARBON IN LEACH PRODUCTION PLANT
(UPGRADABLE TO 1,500 TPD)
Rencana Induk Fasilitas Produksi Floatation and Carbon in Leach berkapasitas 500 tpd
(Dapat ditingkatkan menjadi 1.500 tpd)
Legend for the 500 tpd flotation & CIL plant
1 Raw Ore Stock Pile
2 Raw Ore Bin
3 Crushing
4 Conveyor Belt
5 Screening
6 Fine ore bin
7 Grinding
8 Flotation
9 Thickener flotation concentrate
10 Flotation concentrate filter pressing
11 Thickerner Flotation tailings
12 Flotation tailings filter pressing
13 Leaching
14 Leaching tailings filter pressing, detox
15 Desorption & electro winning
16 Smelting
17 Electrical substation leaching & smelting
18 Air compressor room
19 NaCN warehouse
20 Machine services workshop
21 Laboratory
22 Chemical reagents warehouse
23 Material warehouse
24 Electrical substation crushing & screening
25 Diesel generator
26 Back water pond for grinding, flotation, thickener, and filte
27 Water pump
28 Recycle used water for processing
29 Recycle leaching water
30 Used water pond
31 Electrical substation grinding & flotation
32 Site reserved for grinding
33 Site reserved for flotation
34 Site reserved for thickener flotation tailings
35 Site reserved for flotation tailings filter pressing
36 Site reserved for leaching
37 Site reserved for Leaching tailings filter pressing
38 Site reserved for desorption & electro winning
39 Site reserved for biological or roasting plant
40 Accommodation
41 Pagoda Tower
Page 14
https://wilton.id/projects/project-gallery/
14
Page 15
KEY UPDATES
Perkembangan Utama
15
Page 16
KEY UPDATES
Perkembangan Utama
Operational Update: Operational Update:
As of 16 December 2025, the Group has not yet restarted Sampai dengan 16 Desember 2025, Grup belum memulai
its commercial production. kembali kegiatan produksi komersialnya.
Actions & Future Plan: Actions & Future Plan:
The Group’s actions and future plans to be implemented in 2025 Tindakan Grup dan rencana masa depan yang akan dilaksanakan
until 2026 are as follows: pada tahun 2025 hingga 2026 adalah sebagai berikut:
The Group will make available sufficient funds for its Grup akan menyediakan dana yang memadai untuk
operations, including exploring strategic options that are operasinya, termasuk menjajaki opsi strategis yang
available and has appointed professional firms to assist; tersedia serta telah menunjuk firma profesional untuk
memberikan pendampingan;
The Group will take measures to minimize operating
expenditures, including maintaining a lean workforce; Grup akan mengambil langkah-langkah untuk
meminimalkan biaya operasional, termasuk menjaga
The Group will continue to drawdown on the Working struktur tenaga kerja yang efisien;
Loan Agreement;
Grup akan melanjutkan penarikan dana sesuai Perjanjian
Pinjaman Kerja;
Page 17
KEY UPDATES
Perkembangan Utama
Actions & Future Plan: Actions & Future Plan:
The Group has obtained support letters from WRC and Grup telah memperoleh surat dukungan dari WRC dan
WRH as the ultimate parents and immediate parent WRH selaku entitas induk utama dan induk langsung Grup,
companies of the Group which stated that there are no yang menyatakan bahwa tidak terdapat rencana untuk
present plans to collect any outstanding liabilities as at 31 menagih liabilitas terutang per 31 Desember 2024 untuk
December 2024 for the period of up to at least 31 May periode hingga setidaknya 31 Mei 2026;
2026;
Grup telah melakukan negosiasi dan mencapai
The Group has negotiated and agreed with its primary kesepakatan dengan pemasok utama terkait syarat kredit
vendors on favorable credit terms to settle its current yang lebih menguntungkan untuk penyelesaian liabilitas
liabilities; and lancar; dan
The Management is carrying out maintenance works at Manajemen sedang melakukan pekerjaan pemeliharaan
the Processing Facility to ensure a stable electricity pada Fasilitas Pemrosesan untuk memastikan pasokan
supply and to facilitate the safe resumption of operations. listrik yang stabil serta mendukung dimulainya kembali
After which, the Management will be focusing on operasi secara aman. Setelah itu, Manajemen akan
processing the oxide ores (i.e. open-pit ores) and berfokus pada pemrosesan oxide ores (yaitu bijih dari
subsequently transition to mixed ores (i.e. open-pit ores tambang terbuka) dan akan beralih ke pemrosesan mixed
and underground ores). ores (yaitu kombinasi bijih dari tambang terbuka dan
tambang bawah tanah).
Page 18
Thank You
Page 19
PT Wilton Makmur Indonesia Tbk
Komplek Harco Mangga Dua
(Agung Sedayu), Block C No.5A
Jl. Mangga Dua Raya,
Jakarta 10730, Indonesia
Tel. (+62-21) 612 5585, 612 5586
612 5587, 612 5588
Fax. (+62 21) 612 5583
e-mail email@wilton-groups.com
Website www.wilton.id
Names mentioned 23 people and organisations named in the text · linked when the evidence is strong
unresolved
org
GROUP STRUCTURE Struktur Grup Usaha Wilton Resources Corporation
p.3
unresolved
org
Wilton Resources Holdings Pte. Ltd.
p.3
unresolved
org
Wilton Assets Management Ltd
p.3
unresolved
org
PT. Wilton Investment
p.3
unresolved
org
PT. Wilton Wahana Indonesia
p.3 ×2
unresolved
org
PT. Liektucha Ciemas
p.3 ×2
unresolved
org
PT. WWI
p.4
unresolved
org
PT. WWI IUP
p.4
unresolved
org
PT Witon Wahana Indonesia Issued By
p.4
unresolved
org
PT. LTC
p.4
unresolved
org
PT. LTC IUP
p.4
unresolved
org
PT Liektucha Ciemas Issued
p.4
unresolved
person
Mohammad Raylan President Commisioner
p.5 ×2
unresolved
person
Andrianto D. Lawrence
p.6
unresolved
person
Chia Wei Yang (Ethan
p.6 ×2
unresolved
org
Wilton Resources Corporation Limited
p.7
unresolved
org
ZICO Capital Pte Ltd
p.7
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
No extraction attempted yet.