PUBLIC EXPOSE
    JAKARTA, NOV-25
Page 2
DISCLAIMER
These materials have been prepared by PT Arkora Hydro Tbk (the “Company”) and have not been independently verified.
No representation or warranty, expressed or implied, is made and no reliance should be placed on the accuracy, fairness or
completeness of the information presented or contained in these materials. The Company or any of its affiliates, advisers or
representatives accepts no liability whatsoever for any loss howsoever arising from any information presented or contained
in these materials. The information presented or contained in these materials is subject to change without notice and its
accuracy is not guaranteed. These materials contain statements that constitute forward-looking statements. These
statements include descriptions regarding the intent, belief or current expectations of the Company or its officers with
respect to the consolidated results of operations and financial condition of the Company. These statements can be
recognized by the use of words such as “expects,” “plan,” “will,” “estimates,” “projects,” “intends,” or words of similar
meaning. Such forward-looking statements are not guarantees of future performance and involve risks and uncertainties,
and actual results may differ from those in the forward-looking statements as a result of various factors and assumptions.
The Company has no obligation and does not undertake to revise forward-looking statements to reflect future events or
circumstances. These materials are for information purposes only and do not constitute or form part of an offer, solicitation
or invitation of any offer to buy or subscribe for any securities of the Company, in any jurisdiction, nor should it or any part
of it form the basis of, or be relied upon in any connection with, any contract, commitment or investment decision
whatsoever. Any decision to purchase or subscribe for any securities of the Company should be made after seeking
appropriate professional advice.
Page 3
TABLE OF CONTENT




             1          2            3
          Company     Business    Financial
           Profile   Landscape   Performance
Page 4
Chapter 1
COMPANY PROFILE
                  4
Page 5
COMPANY IN BRIEF

                   PT Arkora Hydro Tbk (ARKO)
                   Established in 2010, PT Arkora Hydro Tbk (ARKO)
                   focuses on run-of-river as a hydropower plant with
                   a current total installed capacity of 62.8 MW.
                   ARKO also has over 300 MW capacity of run-of-river
                   hydropower plant under its pipeline.

                   Vision
                   To expand our portfolio of renewable energy projects and become the
                   market leader of renewable energy power generation while being
                   environmentally and socially responsible.

                   Mission
                   To develop renewable energy potentials in Indonesia in which will
                   reduce carbon emission and build a more sustainable future.



                                                                                         5
Page 6
  RUN-OF-RIVER HPP
  ILLUSTRATION




     2. Desand       1. Weir
3. Waterway

4. Head tank

   5. Penstock

   6. Powerhouse
                       7. Tailrace



                                     6
Page 7
        MILESTONE
                                                                  Project COD                       IPO                                          Project COD
                                                                  Cikopo                            (Initial Public Offering)                    Yaentu
                               Project PPA & construction         Project Construction              Project PPA & Construction                   Project Construction
                               Cikopo                             Tomasa                            Kukusan                                      Tomoni




    2010                 2012               2014               2017             2020             2022                2023                   2024               2025




          Company                                Project                           Project                                 Green bonds issuance
                                                         PPA                               COD
          establishment                          Tomasa                            Tomasa                                  Project Tomoni
          5 Aug 2010                                                                                                       PPA
                                                                                   Project PPA
                                                                                   Yaentu

                                                                                                                                                         Project
                                                                                                                                PPA & Construction
                                                                                                                                                     Pongbembe


PPA : Power Purchasing Agreement                                                                                                                                        7
COD : Commercial Operating Date
Page 8
    COMPANY STRENGTH

1             Strategic Location                                     5             Support for the Government's
                                                                                   "Net Zero Emission" Program
    Situated in the natural forests and connected to PLN networks.       Reducing GHG emissions by ±99,937 tons of CO₂eq annually moving forward.




2
              High-Quality
              Hydropower Plant                                       6             Experienced Management

                                                                         Professionals with over 15 years of experience in the power generation and
    Head >100 m and components of international quality.
                                                                         collectively worked on over 30 hydro power plants in their previous careers.


              Long-Term Contracts,
3             Stable Cashflow                                        7             High Safety Standards

    PLN contracts with an average duration of 15 - 25 years and          The company utilizes contractor services from AEKON, supervised by
    predetermined tariffs, securing the sustainable cashflow             PT Indokoei International, a renowned Japan consulting company.

              Competitive Construction and
4             Operational Costs                                      8             Good Corporate Governance

    Supported by in-house PT Granif Konsultan, experienced in            Implementation of GCG principles across all business lines.
    conducting feasibility studies, detailed designs, and
    comprehensive testing for hydropower plant projects.




                                                                                                                                                        8
Page 9
IN OPERATION: PROJECT CIKOPO

                               Project Cikopo
                               Location   : Garut, West Java
                               Capacity   : 7.4 MW (2 x 3.7 MW)
                               COD        : 2017
                               Period     : 15 years




                                                                  9
Page 10
IN OPERATION: PROJECT TOMASA

                               Project Tomasa
                               Location   : Poso, Central Sulawesi
                               Capacity   : 10 MW (2 x 5 MW)
                               COD        : 2020
                               Period     : 15 years




                                                                     10
Page 11
IN OPERATION: PROJECT YAENTU

                               Project Yaentu
                               Location   : Poso, Central Sulawesi
                               Capacity   : 10 MW (2 x 5 MW)
                               COD        : 2024
                               Period     : 25 years




                                                                     11
Page 12
UNDER CONSTRUCTION: PROJECT KUKUSAN II
Weir completion           Head tank completion

                                                  Location
                                                  Kukusan, Lampung

                                                  Capacity
                                                  5.4 MW (2 x 2.7 MW)

                                                  Expected COD
                                                  4Q25

                                                  Contract period
Turbine final alignment   Powerhouse completion   25 years

                                                  Scheme
                                                  BOOT

                                                  Construction progress
                                                  96.1% (Oct-25)




                                                                          12
Page 13
UNDER CONSTRUCTION: PROJECT TOMONI
Weir formwork installation   Sandtrap rebar installation

                                                           Location
                                                           Luwu Timur,
                                                           South Sulawesi

                                                           Capacity
                                                           10 MW (2 x 5 MW)

                                                           Expected COD
                                                           1H26

Tunnel work - outside        Tunnel work - inside          Contract period
                                                           25 years

                                                           Scheme
                                                           BOOT

                                                           Construction progress
                                                           52.7% (Oct-25)




                                                                                   13
Page 14
UPCOMING: PROJECT PONGBEMBE
                     Pongbembe landscape

                                           Location
                                           South Sulawesi

                                           Capacity
                                           20 MW (3 x 6.7 MW)

                                           PPA date
                                           September 2025

                                           Construction start
                     Pongbembe landscape   November 2025

                                           Expected COD
                                           4-5 years after the
                                           construction started

                                           Contract period
                                           30 years

                                           Scheme
                                           BOOT
                                                                  14
Page 15
Chapter 2
BUSINESS LANDSCAPE
                     15
Page 16
INDONESIA NEW AND RENEWABLE ENERGY MIX



                                                                                                                                                            Only 0.41% of the
                                                                                                                                                            entire potential has
                                                                                                                                                            been utilized, leaving
  Solar                 Hydro                 Bio-                  Wind                  Geo-                  Ocean                 Total                 ample room for the
                                              energy                (>6 m/s)              thermal                                                           development of New
                                                                                                                                                            and Renewable
  Potentials (in GW)    Potentials (in GW)    Potentials (in GW)    Potentials (in GW)    Potentials (in GW)    Potentials (in GW)    Potentials (in GW)    Energy (NRE).

  3,294                 95                    57                    155                   23                    63                    3,687                 This opportunity is
                                                                                                                                                            promising, given the
  Utilization (in MW)   Utilization (in MW)   Utilization (in MW)   Utilization (in MW)   Utilization (in MW)   Utilization (in MW)   Utilization (in MW)   support from the

  1,131                 7,556                 3,129                 152                   2,744                 45                    15,163                government,
                                                                                                                                                            environmental
                                                                                                                                                            concerns, and the
 Utilization (%)        Utilization (%)       Utilization (%)       Utilization (%)       Utilization (%)        Utilization (%)      Utilization (%)       rising electricity
 0.03%                  7.95%                 5.49%                 0.10%                 11.93%                 0.71%                0.41%                 consumption.

Source: Directorate General of New, Renewable Energy, and Energy Conservation, Jun-25




                                                                                                                                                                                     16
Page 17
INDONESIA EXISTING NRE POLICY AHEAD

                 RUPTL 2025-2034
                 PLN's Electricity Supply Business
                 Plan (RUPTL) for 2025-2034

                  - Strategies to reduce GHG
                   emissions for NZE by 2060;         “Out of the total 836,696 workers
                  - Renewable energy accounts for     in the power generation sector,
                   76% (52.9 GW) of the 69.5 GW of    more than 750,000, or 91%, are
                   planned power projects for the
                   next decade;                       green jobs as they are based on
                  - Of the 52.9 GW of renewable
                                                      renewable energy power plants.”
                   energy, hydropower plants make
                   up 22.1% (11.7 GW).               Bahlil Lahadalia
                                                     Minister of Energy and Mineral Resources (ESDM)




                                                                                                       17
Page 18
ARKORA PIPELINE
                                                                   Tomasa - Poso   Yaentu - Poso         Contracted Capacity
                                                                      10    MW
                                                                                   10   MW

                     Jambi             West Kalimantan        Pongbembe -Toraja    Central Sulawesi      62.8 MW
                    5  MW
                                            50    MW
                                                                      20   MW
                                                                                   20   MW
                                                                                                         Current Pipeline

                                                                                                         >300 MW



              Kukusan II – Lampung                      Central
                                                    Kalimantan
                          5.4  MW
                                                          MW
                                                         80
                             Lampung
                                                                South Sulawesi      Southeast Sulawesi
                             6 MW                                   25    MW
                                                                                    6.2   MW

  Cikopo II – West Java   West Java
                                                         Tomoni – Luwu Timur        Southeast Sulawesi
           7.4     MW
                             4 MW

                                                                    10   MW
                                                                                    10   MW


                                             South Sulawesi     South Sulawesi      Southeast Sulawesi

                                                 80    MW
                                                                    35    MW
                                                                                    40   MW

                                                                                                                               18
Page 19
PRODUCTION CAPACITY
                                                                              257.0              ARKO is going faster in utilizing the
                                                                 228.6                           enormous potentials through increasing
                                                                                                 its production capacity by working on our
                                                                                                 pipelines.
                                                    152.4
                                                                                                 Alongside, ARKO also contributes for
               114.4                      118.2                                                  Sustainable Development Goals (SDGs):
   95.7                     97.6




  2021        2022         2023         2024       2025E        2026E       2027E
    Cikopo        Tomasa         Yaentu        Kukusan         Tomoni                 Production (GWh)

 Estimation of production capacity given the COD target of Project Kukusan and Project Tomoni.




                                                                                                                                             19
Page 20
GREENHOUSE GASES (GHG) EMISSION REDUCTION

             GHG emission reduction                   In achieving Indonesia Net-Zero
             Period: 2017 until 3Q25                  Emissions (NZE) 2060, ARKO
 ±266,450
             There was an increase for GHG emission   also contributes towards the
             reduction of 30,500 ton CO2eq in 3Q25    emission reduction.
 ton CO2eq
                                                      Thus, ARKO emboldens its
                                                      contribution for SDGs:




             GHG emission reduction
  ±99,937    potential annually
 ton CO2eq   After all five projects operating
             (including Kukusan and Tomoni)




                                                                                        20
Page 21
STRENGTHENING ESG COMMITMENT


             Education                             Environmental
             - Renovation of elementary            - Watershed rehabilitation by
             school, SDN 1 Panawa, Garut,          planting around 500 pine trees in
             West Java.                            Poso to protect the environment
                                                   in 2025.
             - Procurement of information
             and communication technology
             (ICT) facilities for the school.




             Social                                Infrastructure
             - Donation of qurban in Garut         - Rehabilitation of 5 mosques in
             for the people nearby.                Garumukti Village, Garut.

             - Distribution of basic necessities   - Establishing of Baruga Meeting Hall.
             (sembako) for Desa Panawa, Garut.
                                                   - Improvement of roads (800 m) in
                                                   Panjoka Village, Poso.




                                                                                            21
Page 22
REFORESTATION FOR WATERSHED REHABILITATION
Slope protection with trees   Pine trees planting

                                                    We managed watershed
                                                    rehabilitation covering
                                                    an area of 57 hectares
                                                    by planting 68,970 pine
                                                    trees in Poso, Central
                                                    Sulawesi, from 2022.

                                                    This activity aims to
                                                    restore the ecosystem,
                              Pine trees nursery    protect water sources,
                                                    and preserve the
                                                    environment.




                                                                              22
Page 23
Chapter 3
FINANCIAL PERFORMANCE
                        23
Page 24
   ROBUST GROWTH DRIVEN BY FAVORABLE SEASON
   AND PROJECT ADVANCEMENT IN 9M25                                                                     The favorable weather in
                                                                                                       9M25,      particularly     the
                                                   248                                     247         unexpected rain during what is
                                                                       239                             typically a dry Q3, led to
                                                                                                       higher electricity production.
                                198
                                                             179                                       Additionally, Project Yaentu
                                                                                 154                   contributed significantly after
                                                                                                       becoming operational in 4Q24.

                                                                                                       Thus, these factors drove
                                                                                                       strong growth, resulting in
                                                                                                       ARKO achieving a net profit of
   Revenue - yearly            125%1                         122%1
                                                                                 126%1                 Rp47.7 billion, marking a
                                                   121%1               118%1               119%1
   Revenue - quarterly                                                                                 17.7% YoY increase in 9M25.
   NPM (%)

     INDICATOR                  2021               2022      2023      2024      9M24      9M25     YoY
Revenue                            198.4             247.9     178.8     238.9     153.5    247.4   61.2%
Net profit                          49.7              52.7      39.1      41.8      40.5     47.7   17.7%
Net profit margin                  25.1%             21.1%     21.9%     17.5%     26.4%    19.3%   -4.7%
Currency in billion IDR, unless stated otherwise




                                                                                                                                         24
Page 25
  SOLID BALANCE SHEET IN 9M25
    Total Asset                                      Total Liabilities                            Total Equities
    9M25: Rp1,588.7 bn                               9M25: Rp1,089.6 bn                           9M25: Rp499.1 bn
                                             1,589

                              1,338           191

                1,158           176
                                                                                         1,090
    948            154
                                                                                            53
                                                                             887
     183                                                           720
                                             1,397                            94
                               1,161                                70
                  1,004                              548                                  1,036
                                                                                                                   452    499
                                                      161
                                                                             792
                                                                                                  400     438
     765                                                           650


                                                      387




   2022          2023          2024          9M25    2022         2023      2024         9M25     2022   2023      2024   9M25
   Non-current asset         Current asset           Long term liability   Short term liability
Currency in billion IDR, unless stated otherwise

                                                                                                                                 25
Page 26
Head of Investor Relations
Nicko Yosafat
n.yosafat@arkora.com

PT ARKORA HYDRO TBK - @arkorahydro
Treasury Tower Level 9 Unit G-H
District 8 SCBD Lot 28
Jl. Jend. Sudirman Kav 52-53
Jakarta, Indonesia 12190

File

File Open PDF
Source IDX
Size5.07 MB
Published20 Nov 2025
Pages26
Characters27,024
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 5 people and organisations named in the text · linked when the evidence is strong

linked org Arkora Hydro Tbk p.2 ×11
unresolved org PT Indokoei International p.8
unresolved org PT Granif Konsultan p.8
unresolved org Directorate General of New p.16
unresolved org Minister of Energy and Mineral Resources p.17

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

Other files in this announcement 1

↑↓ select ↵ open ⇧↵ see every result