Back to announcement
20251010_ARCI_Laporan Bulanan Aktivitas Eksplorasi_31966560_lamp1.pdf
Other Text extracted ARCISource file signed link, expires in 15 minutes
Extracted text 3
Page 1
No: 0054/ARCHI/10/2025/G EXPLORATION REPORT PT Archi Indonesia Tbk. 30th September 2025
Page 2
No: 0054/ARCHI/10/2025/G
PT Archi Indonesia Tbk. (the ”Company” or “ARCI”) owns 100% of Toka Tindung Gold Mine,
a gold mine located approximately 35 kilometers northeast of Manado, North Sulawesi,
through the Company’s wholly-owned subsidiaries, PT Meares Soputan Mining (“MSM”) and
PT Tambang Tondano Nusajaya (“TTN”).
Toka Tindung Gold Mine consists of two Contract of Works (“CoWs”) covering 39,817
hectares, which cover into two administration areas in North Sulawesi, North Minahasa and
Bitung City districts (Figure 1). The CoWs are valid until 2041 and held by MSM and TTN.
Pursuant to the Mining Law Amendment, MSM and TTN have been guaranteed two times
extensions of the CoWs in the form of Special Mining Business License/Izin Usaha
Pertambangan Khusus (“IUPK”), each for maximum period of 10 years.
Figure 1. Map Location of MSM and TTN’s Contract of Works
Exploration activities carried out by the Company, through its subsidiaries, which are MSM
and TTN, from January to September 2025 were focused on exploration and drilling activities
to increase resources and reserves in Eastern Corridor Area and in Western Corridor Area.
Page 3
No: 0054/ARCHI/10/2025/G
Below are the details of drilling activities from January to September 2025 with total 297 holes
and 63,174 meters were as follow:
• In the first quarter, ARCI had conducted drilling at 84 holes with a total depth of 19,833
meters.
• In the second quarter, ARCI had conducted drilling at 106 holes with a total depth of
20,742 meters.
• In the third quarter, ARCI had conducted drilling at 107 holes with a total depth of
22,599 meters.
Drilling activities for gold Resource Definition and Exploration, involved Diamond Drilling
(“DD”) and Reverse Circulation (“RC”) drilling methods, conducted by PT Maxidrill Indonesia.
Details number of drill programs by project and by month, are shown in Table 1.
Table 1. Drilling Results Details for the Period January to September 2025 Based on Prospects
and Drilling Types
Diamond Drilling (DD) Reverse Circulation (RC)
Period
Number of Drill Drilling Number of Drill Drilling
Holes Meters Holes Meters
1st Quarter 2025 34 10,761 50 9.072
2nd Quarter 2025 43 10,347 63 10.395
3rd Quarter 2025 44 9,592 63 13.007
TOTAL 121 30,700 176 32.474
Total Exploration activities cost from January 2025 to September 2025 US$7,124,792
Based on the drilling results carried out by the Company from January to September 2025,
the following is a summary of the significant discoveries:
1. Interval of 18.70m with a gold grade of 6.72 g/t at a depth of 153.70m - 172.40m
2. Interval of 11.10m with a gold grade of 13.66 g/t at a depth of 218.40m - 229.50m
3. Interval of 5.40m with a gold grade of 26.57 g/t at a depth of 232.40m - 237.80m
4. Interval of 28.65m with a gold grade of 4.59 g/t at a depth of 166.75m - 195.40m
5. Interval of 37.80m with a gold grade of 7.20 g/t at a depth of 178.70m - 216.50m
6. Interval of 19.00m with a gold grade of 9.15 g/t at a depth of 174.00m – 193.00m
7. Interval of 23.00m with a gold grade of 5.93 g/t at a depth of 190.00m – 213.00m
Names mentioned 4 people and organisations named in the text · linked when the evidence is strong
unresolved
org
PT Meares Soputan Mining
p.2
unresolved
org
PT Tambang Tondano Nusajaya
p.2
unresolved
org
PT Maxidrill Indonesia. Details
p.3
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
No extraction attempted yet.