Back to announcement
20251009_BRMS_Laporan Bulanan Aktivitas Eksplorasi_31966166_lamp2.pdf
Other Text extracted BRMSSource file signed link, expires in 15 minutes
Extracted text 16
Page 1 OCR 0.918
(GP BRM PT Bumi Resources Minerals Tbk. Bakrie Tower, 6 & 10” Floor Komplek Rasuna Epicentrum Jl. H.R. Rasuna Said, Kuningan Jakarta Selatan 12940 Indonesia T 46221 5794 5698 F 462 2157945687 www.bumiresourcesminerals.com LAPORAN TENTANG AKTIVITAS EKSPLORASI OLEH ANAK PERUSAHAAN PT BUMI RESOURCES MINERALS TBK, (REPORT ON EXPLORATION ACTIVITIES BY SUBSIDIARIES OF PT BUMI RESOURCES MINERALS TBK.) PT Citra Palu Minerals Nama Perusahaan (Name of Company Tahap Kegiatan KK (Phase of Activity of Contract of Work) Laporan Eksplorasi Periode (Period of Exploration Report PT Citra Palu Minerals (“PT CPM") Operasi Produksi (Production Operation) Juli - September (u/ - Sept) 2025 daya di Prospek River Reef - Watuputih, Blok | Poboya, dengan total kedalaman saat ini 87.472,65m. . Melanjutkan kegiatan pemetaan geologi di Area Blok IV area Taanes, dengan total 309 sampel batuan dan 278 sampel tanah. . Melakukan kegiatan pemetaan geologi di Area Blok VI Roto dengan total 92 sampel batuan. Melakukan pengiriman sampel inti bor untuk analisis geokimia (Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Hg dan kombinasi Au 4 ICP OES multi elemen) dan analisis AAT (Air Asam Tambang) ke Laboratorium PT Geoservices. Melakukan pengiriman sampel batuan dan tanah untuk analisis geokimia (Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Hg dan kombinasi Au - ICP Daerah Eksplorasi Exploration Areas 1. Blok I, Sulawesi Tengah (Operasi Produksi) 1. Block 1, Central Sulawesi (Production 2. Blok II, Sulawesi Selatan (Eksplorasi) Operation) 3. Blok IV, Sulawesi Tengah (Eksplorasi) 2. Block I, South Sulawesi (Exoloration) 4. Blok V, Sulawesi Tengah (Eksplorasi) 3. Block IV, Central Sulawesi (Exploration) 5. Blok VI, Sulawesi Tengah (Eksplorasi) 4. Block V, Central Sulawesi (Exploration) 5. Block VI, Central Sulawesi (Exploration) Biaya Eksplorasi Exploration Cost 875,421.22 Dollar AS USD 875,421.22 Bentuk Kegiatan Eksplorasi Form of Exploration Activities 1. Melanjutkan kegiatan pengeboran sumber (7. Continue resource drilling program at the River Reef-Watuputih Prospect, Block I Poboya, with a@ current total depth of 87,472.65m. Continue geological mapping activities in Block IV Taanes area, with a total of 309 rock samples and 278 soil samples collected. Conducted geological mapping activities in Roto area Block MI with & total of 92 rock samples. Carried out geochemical analysis from drill core samples (Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Hg and combination of Au # ICP OES multi elements) and AAT (Acid Mine Drainage) analysis by PT Geoservices Laboratory. Carried out geochemical analysis from rock and soil samples (Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Hg, and Au 4 ICP-OES multi-element A
Page 2 OCR 0.896
BRM OES multi elemen) ke Laboratorium PT Geoservices serta analisis geokimia (kombinasi Au, Ag, Cu dan Agua Regia Digest) ke Laboratorium PT CPM. combination) to PT Geoservices Laboratory, as well as geochemical analysis (Au, Ag, Cu combinatian using Agua Regia Digest method) to PT CPM Laboratory 6. Melakukan pengiriman 10 sample batuan dari |6. Sending 10 rock samples from drilling at the hasil pengeboran di Prospek River Reef untuk River Reef Prospect to Panda Geoscience, New analisis mieragrafi - petrografi dan SEM-EDS Zealand, for mineragraphy-petrography and ke Panda Geoscience, New Zealand. SEM-EDS analysis. 7. Melakukan survey akses menuju area Winehi (7. Conducted access survey to the Winehi area Blok li melalui jalur Lembah Bada. Block II via the Lembah Bada route. Pihak-Pihak yang Terlibat Involved Parties 1. Laboratorium PT CPM 1. Internal PT CPM Laboratory 2. PT Sumagud Sapta Sinar 2. PT Sumagud Sapta Sinar 3. Laboratorium PT Geoservices 3. PT Geoservices Laboratory 4. Bureau Varitas — PT IOL Indonesia 4. Bureau Varitas — PT IOL Indonesia 5. PT SN Cargo 5. PT SN Cargo 6. Panda Geoscience 6. Panda Geoscience Metode Pengujian dan Pemilihan Areal Testing Method and Selection Area ND YBWNA AAS Specific Gravity Fire Assay Agua Regia Digest Hg Analisis ICP OES 42 unsur Analisis Air Asam Tambang Mineragraphy — Petrography, SEM-EDS DNDUA WNI AAS Specific Gravity Fire Assay Agua Regia Digest Hg Analysis ICP OES 42 elements ARD Test Mineragraphy — Petrography: SEM-EDS Kemajuan Eksplorasi Terhadap Kegiatan Triwulan Sebelumnya Exploration Progress toward the Preceding Guarter Activities 1. Pengeboran sumber daya di Prospek River Reef - Watuputih Blok I Poboya dilakukan dengan menggunakan 2 rig. Total sebanyak 351 titik telah selesai dibor, termasuk 3 titik bor hidrogeologi dan 13 titik bor geotek, dengan total kedalaman 87.472,65m sampai akhir September 2025. Terdapat penambahan 5 titik bor dengan jumlah kedalaman 1.998,10m dari — periode sebelumnya. Penambahan jumlah sampel sebanyak 2.751 sampel hasil pengeboran Prospek River Reef- Watuputih Blok 1 Poboya yang dikirim ke Laboratorium PT Geoservices untuk dianalisis geokimia (Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Hg dan kombinasi Au 4 ICP 42 unsur), serta 5 sampel untuk analisis AAT (Air Asam Tambang). Penambahan jumlah sampel sebanyak 111 sampel hasil pengeboran Blok IV Prospek 1 Resources drilling program in River Reef Watuputih Prospect Block 1 Poboya was conducted using 2 rigs. A Total of 357 drill holes has been completed, including 3 hydrogeology holes and 13 geotechnical holes, with total depth of 87,472.65m by the end of September 2025. There are 5 additional completed drill holes with total depth of 1,998. 10m from previous period. Additional 2,751 drill core samples from River Reef - Watuputih Prospect of Block I Poboya drilling program have been sent to PT Geoservices Laboratory to be analyzed (Au, Ag, u, Pb, Zn, As, Sb, Mo, Hg and combinatian Au # ICP 42 elements), also 5 samples for ARD (Acid Rock Drainage). Additional 111 drill core samples from Block IV Janja Prospect drilling program have been bw
Page 3 OCR 0.911
(&D BRM Janja yang dikirim ke Laboratorium PT Geoservices untuk dianalisis geokimia (Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Hg dan kombinasi Au 4 ICP 42 unsur dan 15 sampel untuk analisis air asam tambang. sent to PT Geoservices Laboratory to be analyzed (Au, Ag, u, Pb, Zn, As, Sb, Mo, Hg and combination Au 4 ICP 42 elements) and 15 sample for ARD (Acid Rock Drainage). 4. Total penambahan sebanyak 309 sampel | 4 Total additional 309 rock samples and 278 batuan dan 278 sampel tanah berasal dari soil samples collected from geological kegiatan pemetaan geologi di area Blok IV. mapping activity at area Block IV. 5. Total penambahan sebanyak 92 sampel | 5. Total additional 92 rock samples collected batuan dari kegiatan pemetaan geologi di rom geological mapping activity at Roto area, area Roto Blok VI. Block V1. 6. Total penambahan sebanyak 10 sampel | & A total of 10 additional rock samples from batuan dari conto inti di Prospek River Reef core specimens at the River Reef Prospect for untuk analisis petrografi-mineragrafi dan petrograohy-mineragraphy and SEM-EDS SEM-EDS. analysis. Rencana Selanjutnya Next Plan 1. Melanjutkan kegiatan pengeboran di Prospek | 7. Continue resources drilling program in River River Reef - Watuputih, Blok | Poboya Reet-Watuputih Prospect of Block 1 Poboya dengan tujuan untuk menambah sumber with objectives to increase resources in River daya di Prospek River Reef. Reef Prospect. 2. Melanjutkan pemetaan geologi detil di area | 2 Continue detailed geological mapping at Taanes di Blok IV dan area Roto di Blok VI. Taanes area in Block IV and Roto area in Block VI. Hambatan Eksplorasi Barriers to Exploration Kegiatan penambangan tanpa izin (PETI) oleh masyarakat sekitar. Ilegal mining activities by local community. Perizinan Persetujuan Baru Yang Diperoleh New Permits/Approvals Acguired Keputusan Menteri Kehutanan Republik Indonesia Nomor 410 Tahun 2025 tentang Perpanjangan Persetujuan Penggunaan Kawasan Hutan untuk Kegiatan Eksplorasi Lanjutan pada Tahap Operasi P Toduksi Emas pada Kawasan Hutan Produksi Terbatas atas nama PT Citra Palu Minerals di Kota Palu, Provinsi Sulawesi Tengah Seluas #67,87Ha. Decree of the Minister of Forestry of the Republic Of Indonesia Number 410 of 2025 concerning the Extension of the Approval for the Utilization af Forest Areas for Further Exploration Activities at the Gold Production Operation Stage within the Limited Production Forest Area on behalf of PT Citra Palu Minerals in Palu City, Central Sulawesi Province, covering an area of approximately 67.87 hectares. LN
Page 4 OCR 0.917
Nama Perusahaan (“DS BRM PT. Dairi Prima Mineral (Name of Company) Tahap Kegiatan KK (Phase of Activity of Contract of Work) Laporan Eksplorasi Bulan (Monthly Exploration Reporh PT Dairi Prima Mineral Operasi Produksi (Production Operation) Juli - September (/u/ - Sept) 2025 A. | Daerah Eksplorasi Exploration Areas Kegiatan eksplorasi pada Prospek Anjing Hitam | Ailed exploration activities on Anjing Hitam sudah selesai dilakukan dan saat ini prospek | Prosoeci has already been completed. The tersebut memasuki tahap Operasi Produksi. prospect currently is in Operation and Production stage. Selain Prospek Anjing Hitam, di dalam wilayah | Beside Anjing Hitam Prospect, there are some Kontrak Karya DPM masih terdapat prospek- | other prospect areas within DPM Contract of prospek lainnya dengan tahap kegiatan yang | Work tenement. The prospects work progress berbeda-beda dari eksplorasi regional hingga | are in different stages, range from regional pengeboran deliniasi sumberdaya. exploration to delineation resource drilling. Salah satu prospek yang paling maju | Lae Jehe Prospect is the most advantage pengerjaannya adalah Prospek Lae Jehe yang | exploration activities. This prospect is Situated terletak sekitar 200 meter di sebelah baratlaut | approximately 200 meters toward northwest Prospek Anjing Hitam. Prospek ini sudah | om Anjing Hitam Prospect. This prospect memasuki — tahap pengeboran — deliniasi | work stage is in resource delineation drilling sumberdaya dan masih akan dikembangkan | and will be developed to get final mineral hingga didapatkan sumberdaya mineral dengan | resource valve with dominant measured and klasifikasi terukur dan tertunjuk yang lebih | indicated mineral resources dassification. dominan. B. | Biaya Eksplorasi Exploration Costs 24.375,80 Dolar AS USD 24,375.80 C. | Bentuk Kegiatan Eksplorasi Form of Exploration Activities Selama bulan Juli hingga September 2025 tidak | During July to September 2025 there is no ada kegiatan eksplorasi. exploration activities. B | Pihak-Pihak yang Terlibat Parties Involved E. | Metode Pengujian dan Pemilihan Areal Testing Method and Selection of Area F. | Kemajuan Eksplorasi Terhadap Bulan sebelumnya | Exp/oration Progress relative to Preceding Month's Activities G. | Rencana Pengeboran Selanjutnya Next Drilling Plan - Penambahan titik bor di Prospek Lae Jehe dan Basecamp - Infill driling in Lae Jehe and Basecamp Prospect "4
Page 5 OCR 0.882
(&P BRM Harnbatan Eksplorasi Barriers to Exploration Perizinan / Persetujuan Baru Yang Diperoleh New Perrnits / Approvals Acguired » Persetujuan Amdal No.731 Tahun 2005 # Persetujuan RKAB untuk Tahun 2024-2026 Nomor: T-1793/MB.04/DJB.M/2024 tanggal 14 Oktober 2024. # DPM telah mendapatkan Persetujuan Tekno- Ekonomi Dokumen Studi Kelayakan Kontrak Karya DPM berdasarkan Surat Persetujuan No. 2150/30/DBM/2015. » Tahap kegiatan DPM disesuaikan menjadi Tahap Operasi Produksi berdasarkan Surat Keputusan Menteri Energi dan Sumber Daya Mineral No. 456.K/30/DJB/2017 « Letter AMDAL Approval No. 731-2005 « DPM 2024-2026 work plan approval (RKAB) No. T-1793/MB.04/DIB.M/2024, 14 October 2024. » Letter from Direktorat Jenderal Mineral dan Batubara No. 2150/30/DBM/2015 awarding Techno-Economic Approval of Feasibility Study Document Contract of Work of DPM has already been received, » DPM work activity has already been adjusted became Operation Production Phase based on Decree of Energy and Mineral Resources Minister No. 456.K/30/D1B/2017
Page 6 OCR 0.906
(SD BRM
II. PT Gorontalo Minerals
Nama Perusahaan 1 PT Gorontalo Minerals ("PT GM")
(Name of Company)
Tahap Kegiatan KK
(Phase of Activity of Contract of Work)
Laporan Eksplorasi Bulan
(Monthiy Exploration Report)
Operasi Produksi (Production Operation)
Juli - September (/ul - Sepi) 2025
A. | Daerah Eksplorasi Exploration Areas
1. Kompleks Cabang Kiri, Blok I (Tombulialto), | 1. Cabang Kiri Complex, Block 1 (Tombulilato),
Gorontalo Gorontalo
2. Kompleks Motomboto, Blok I (Tombulilato), | 2. Motomboto Complex, Block 1 (Tombulilato),
Gorontalo Gorontalo
3. Prospek Kayubulan, Blok 1 (Tombulilato), | 3. Kayubulan prospect, Block 1 (Tombulilato),
Gorontalo Gorontalo
4. Kompleks Sungai Mak, Blok I (Tombulialto), | 4. Sungai Mak Complex, Block 1 (Tombulilato),
Gorontalo Gorontalo
5. Area Gunung Lintah, Blok 1 (Tombulilato), | 5. Gunung Lintah Area, Block 1 (Tombulilato),
Gorontalo Gorontalo
6. Area Mono, Blok I (Tombulilato), Gorontalo | 6. Mono Area, Block I (Tombulilato), Gorontalo
B. | Biaya Eksplorasi Exploration Costs
1.243,678.18 Dolar AS USD 1,243,678.18
C. | Bentuk Kegiatan Eksplorasi Form of Exploration Activities
1.
Melakukan pengeboran eksplorasi di area
Prospek Cabang Kiri East Blok 1
Tombulilato dengan total kedalaman
pengeboran saat ini 10.172,10 meter dari
total rencana 67.612,30 meter dan telah
menyelesaikan sembilan lubang bor dari
total 69 rencana lubang bor.
Menyelesaikan pengeboran sterilisasi di
area Kompleks Motomboto dan Kompleks
Sungai Mak, Blok I Tombulilato dengan
total kedalaman 2.141,50 meter dari total
13 lubang bor.
Melanjutkan pemetaan geologi dan
pengambilan sampel batuan permukaan di
area Kayubulan, Gunung Lintah, Cabang
Kiri, dan Mono, Blok 1 Tombulilato.
Melanjutkan kegiatan ridge spur soil
sampling pada area Kayubulan, Gunung
Lintah, Cabang Kiri, dan Mono, Blok I
Tembulilato.
Total sampel pengeboran Prospek Cabang
Kiri East, Blok 1 Tombulilato sebanyak
4.585 conto inti bor telah dikirimkan ke
Laboratorium PT Geoservices untuk analisis
1.
Conducting exploration drilling in Cabang Kiri
Fast Prospect area, Block 1 Tombulilato with
current drilling progress 1017210 metres
Trom a total newest plan of 67,612.30 metres
and already completed nine drill holes out of
69 planned drill holes.
Completing sterilisation drilling in Motomboto
Complex and Sungai Mak Complex, Block 1
Tombulilato with total depth 2,141.50 meters
Of 13 drillholes.
Continuing geological mapping and surface
rock samples collecting in Kayubulan, Gunung
Lintah, Cabang Kiri, and Mono, Block 1
Tombulilato.
Continuing ridge spur soil sampling at
Kayubulan, Gunung Lintah, Cabang Kiri, and
Mono, Black I Tombulilato.
A total of 4,585 core samples from Cabang
Kiri East Prospect, Block 1 Tombulilato have
been sent to the PT Geoservices Laboratory for
geochemical analysis.
A
Page 7 OCR 0.908
(PD BRM gcokimia. 6. Total sampel pengeboran sterilisasi di area Kompleks Motomboto dan Kompleks Sungai Mak, Blok I Tombulilato sebanyak 991 sampel inti bor telah dikirimkan ke Laboratorium PT Geoservices untuk analisis geokimia. 7. Total sampel batuan permukaan sebanyak 2.443 sampel dari Kompleks Sungai Mak, Kayubulan, area Gunung Lintah, dan Kompleks Cabang Kiri Blok | Tombulilato yang telah dikirimkan ke Laboratorium PT Geoservices untuk analisis geokimia. 8. Total sampel tanah sebanyak 1.564 sampel dari Kompleks Sungai Mak, Kayubulan, area Gunung Lintah, Kompleks Cabang Kiri, dan Mono, Blok I Tombulilato telah dikirimkan ke Laboratorium PT Geoservices untuk analisis geokimia. 9. Melakukan pengujian sample umpire untuk GAOC core Prospek Cabang Kiri East dan Sungai Mak di Laboratorium PT. Intertek sebanyak 117 sampel Melakukan pengujian metalurgi flotasi tahap awal pada sample core di Prospek Cabang Kiri £ast, Blok | Tombulilato. 11. Menyelesaikan uji metalurgi tahap II dengan berkoordinasi bersama tim penyusun BED Heap Leach Project untuk big column test terhadap sampel dengan komposisi 2 sampel komposit dari Prospek Motomboto North dan 3 sampel komposit dari Prospek Motomboto East, Blok 1 Tombulilato. 10. 6. A total of 991 core samples sterilization drilling from Motomboto Complex and Sungai Mak Complex, Tombullilato Block I, were sent to PT Geoservices Laboratory for geochemical analysis. 7. A total of 2443 surface rock samples from Sungai Mak Complex, Kayubulan, Gunung Lintah area and Cabang Kiri Complex Block 1 Tombulilato have been sent to PT Geoservices Laboratory for geochemical analysis. 8. A total of 1,564 soil samples from Sungai Mak Complex, Kayubulan, Gunung Lintah area, Cabang Kiri Complex, and Mono, Block 1 Tombulilato have been sent to PT Geoservices Laboratory for geochemical analysis. 9. Conducting umpire sample testing for GAOC of core irom Cabang Kiri East and Sungai Mak Prospects at PT Intertek Laboratory totally 117 samples. . Conducting initial fotation metallurgy testing on core samples from Cabang Kiri East Prospect, Block I Tombulilato. 11. Completing the second phase of metallurgical testing in coordination with the BED Heap Leach Project team for the big column test for 2 composite samples of Motombota North Prospect and 3 composite samples of Motomboto East Prospect, Block 1 Tombulilato. 2. PT Minera Nusa Drillindo. 12. Melakukan pengujian conto tanah terkait | 12. Conducting soil sample testing to supoort BED kebutuhan BED untuk desain timbunan reguirements for the leach pad design in the leach pad di Kompleks Motomboto, Blok I Motomboto Complex, Block I Tombulilato. Tombulilato. 13. Melanjutkan estimasi sumber daya dan (13. Continuing mineral resources and reserves cadangan — mineral — untuk — Prospek estimation for Motomboto East and Motomboto £ast dan Motomboto North, Motomboto North Prospects, as well as the serta domain oxide dari Prospek Sungai oxide domain of Sungai Mak Prospect, Block 1 Mak Blok I Tombulilato. Tombulilato. 14, Melanjutkan proses peninjauan area PIPPIB | 14, Continuing review process for the PIPPIB area dan pengajuan PPKH eksplorasi. and submit the application for exploration PPKH (forestry permit), Pihak-Pihak yang Terlibat Parties Involved 1. PT Sumagud Sapta Sinar. 1. PT Sumagud Sapta Sinar. 2. PT Minera Nusa Drillindo. T
Page 8 OCR 0.906
(PD BRM . Laboratorium PT Geoservices. . Laboratorium Geomekanika ITB. . PT Soilens. . PT Solusi Geotek Optima. . PT Jarvis Sinergi Yasa. TAUAWw PT Geoservices Laboratory. Laboratorium Geomekanika ITB. PT Soilens. PT Solusi Geotek Optima . PT Jarvis Sinergi Yasa. NOwaw Metode Pengujian dan Pemilihan Areal esting Method and Selection of Area Kemajuan Eksplorasi Terhadap Kegiatan Triwulan Sebelumnya Exploration Progress toward Previous Guarters Activities 1. Kemajuan aktivitas pengeboran eksplorasi di Prospek Cabang Kiri £ast, Blok | Tombulilato mencakup penambahan 5 lubang bor dengan total kedalaman 4.332,80. 2. Menyelesaikan pengeboran sterilisasi di area Kompleks Motomboto dan Kompleks Sungai Mak, Blok 1 Tombulilato meliputi penambahan 1 lubang dengan total kedalaman 145,20 meter. 3. Penambahan jumlah sampel sebanyak 2.375 sampel dari hasil pengeboran pada Prospek Cabang Kiri £ast, Blok I Tombulilato yang dikirim ke Laboratorium PT Geoservices untuk dianalisis. 4. Mengirimkan sebanyak 991 sampel inti bor dari hasil pengeboran sterilisasi pada Kompleks Motomboto dan Kompleks Sungai Mak, Blok 1 Tombulilato ke Laboratorium PT Geoservices — untuk dianalisis. 5. Penambahan jumlah sampel batuan permukaan sebanyak 522 sampel dari Kayubulan, Gunung Lintah, Kompleks Cabang Kiri, dan Mono, Blok I Tombulilato yang telah dikirimkan ke Laboratorium PT Geoservices untuk analisis geokimia dalam periode ini. 6. Penambahan jumlah sampel tanah sebanyak 123 sampel dari Kayubulan, Gunung Lintah, Kompleks Cabang Kiri, dan Mono, Blok | Tombulilato yang telah dikirimkan ke Laboratorium PT Geoservices untuk analisis geokimia dalam periode ini. 7. Menyelesaikan uji metalurgi tahap II dengan berkoordinasi bersama tim penyusun BED Heap Leach Project untuk big column test terhadap sampel dengan komposisi 2 sampel komposit dari Prospek Motomboto North dan 3 sampel komposit dari Prospek Motomboto £ast, Blok 1 Tombulilato. 1. The progress of drilling activities in Cabang Kiri East Prospect area, Block 1 Tombulilato Induded the addition of 5 holes with total depth of 4,332.80 metres. 2. Completed sterilization drilling in Motomboto Complex and Sungai Mak Complex, Block I Tombulilato included the addition of 1 hole with total depth 145.20 meters. 3. An additional 2.375 samples from the drilling result at Cabang Kiri East Prospect area, Block 1 Tombulilato which were sent to Geoservices Laboratory for analysis. 4. Sending 991 drilling core samples irom sterilisation drilling in Motomboto Complex and Sungai Mak Complex, Block 1 Tombulilato to Geoservices Laboratory for analysis. 5. An additional 522 surface rock samples were collected from the Kayubulan, Gunung Lintah, Cabang Kiri Complex, and Mono, Block 1 Tombulilato, which have been sent to PT Geoservices Laboratory for geochemical analysis during this period. 6. An additional 123 soil samples from the Kayubulan, Gunung Lintah, Cabang Kiri Complex. and Mono, Block 1 Tombulilato, were sent to PT Geoservices Laboratory for geochemical analysis during this periad. 7. Completing the second phase of metallurgical testing in coordination with the BED Heap Leach Praject team for the big column test for 2 composite samples of Motomboto North Prospect and 3 composite samples of Motomboto East Prospect, Block I Tombulilato. AW
Page 9 OCR 0.895
(«DS BRM 8. Menyelesaikan pengujian conto tanah terkait kebutuhan BED untuk desain timbunan each pad di Kompleks Motomboto, Blok I Tombulilato. 8. Completing soil sample testing to support BED reguirements for the leach pad design in the Motomboto Complex, Block I Tombulilato, Rencana Selanjutnya Next Plan 1. Melanjutkan pengeboran eksplorasi di area Kompleks Cabang Kiri, Blok ! Tombulilato. 2. Melanjutkan kegiatan pemetaan geologi dan pengambilan — sampel batuan permukaan di Area Mono dan Gunung Lintah, Blok I Tombulilato. 3. Melanjutkan kegiatan ridge spur soil sampling pada Area Mono dan Gunung Lintah, Blok | Tombulilato. 4. Melanjutkan proses BED untuk design pabrik heap leach di Prospek Motomboto North dan Motomboto East, Blok I Tombulilato. 5. Melanjutkan estimasi sumber daya dan cadangan mineral untuk Prospek Motomboto North dan Motomboto East, serta domain oxide dari Prospek Sungai Mak. 6. Melanjutkan proses peninjauan area PIPPIB dan pengajuan PPKH eksplorasi. 7. Melakukan Studi Kelayakan dan AMDAL untuk Kompleks Motomboto Blok I Tombulilato. 1. Continuing exploration drilling in Cabang Kiri Complex area, Block 1 Tombulilato. 2. Continuing geological mapping and surface rock sampling in Mono Area and Gunung Lintah, Block 1 Tombulilato. 3. Continuing ridge spur soil sampling in Mono Area and Gunung Lintah, Block I Tombulilato. 4. Continuing the BED process for the heap leach plant design at Motomboto North and Motomboto East Prospects, Block 1 Tombulilato 5. Continuing mineral resource and reserve estimation for the Motomboto East and Motomboto North Prospects, as well as the oxide domain of the Sungai Mak Prospect. 6. Continuing the review process far the PIPPIB area and ihe submissian of the exploration PPKH application (forestry permit). 7. Conducting a Feasibility Study and AMDAL for the Motomboto Complex Block 1 Tombulilato. Hambatan Eksplorasi Barriers to Exploration 1. Adanya aktivitas Penambangan Tanpa Izin (PETI) di arca rencana pengeboran Kompleks Motomboto, Blok I Tombulilato. 2. Munculnya aktivitas Penambangan Tanpa Izin (PETI) baru di area sepanjang jalur bukaan jalan perintis. 1. An Illegal Mining Activity (PETI) in the drilling planned area of Motomboto Complex of Block 1 Tombulilato. 2. New Ilegal Mining Activity (PET) in the opening area alongside the pioneering road construction. Perizinan/Persetujuan Baru Yang Diperoleh New Permit/Approyals Acguired w
Page 10 OCR 0.899
(«PD BRM IV. PT Linge Mineral Resources Nama Perusahaan (Name of Company) Tahap Kegiatan IUP (Phase of Activity of Mining Permit Laporan Eksplorasi Periode (Period of Exploration Report) PT Linge Mineral Resources (“PT LMR”) Eksplorasi (Exploration) Juli - September (Yul - Sept) 2025 A. | Daerah Eksplorasi Exploration Areas 1. Prospek Bulan (Proyek Abong) 1. Bulan Prospect (Abong Project) 2. Prospek Bintang 1 (Proyek Abong) 2. Bintang 1 Prospect (Abong Project) 3. Prospek Bintang 2 (Proyek Abong) 3. Bintang 2 Prospect (Abong Project) 4. Eksplorasi Regional (Semua Lokasi dalam IUP) 4. Regional Exploration (Located by IUP) B. | Biaya Eksplorasi Exploration Cost 345.913,11 Dolar AS USD 345.913,71 C. | Bentuk Kegiatan Eksplorasi Form of Exploration Activities 1. Pengeboran studi di Prospek Bulan dan Bintang untuk program Studi metalurgi dan geoteknik dalam rangka penambahan data Untuk studi AMDAL. 2. Pemetaan geologi detil dan semi detil di Abong Extension. 3. Pengambilan sampel tanah menggunakan metode ridge and spurdi Abong Extension. 4. Melakukan pengiriman sampel inti bor ke Laboratorium PT Geoservices untuk analisis geokimia. 5. Melakukan pengiriman sampel batuan ke Laboratorium PT Geoservices untuk analisis geokimia. 6. Melakukan pengiriman sampel tanah ke Laboratorium PT Geoservices untuk analisis georimia. 7. Melakukan — pengiriman — sampel — ke Laboratorium PT Geoservices untuk uji metalurgi pendahuluan Pulverized bottle roll test (PBRT). 8. Finalisasi analisis geofisika dan mineralisasi yang disusun oleh konsultan Fathom Geophysic. 9. Finalisasi analisis Petrografi yang dilakukan oleh konsultan Panda Geoscience 10. Finalisasi laporan Studi Sinkhole, Geoteknik, Hidrologi, dan Hidrogeologi yang dilakukan oleh konsultan PT Jarvis Sinergi Yasa. 11. Proses Perijinan lingkungan ke pemerintah pusat terkait Surat Keputusan Kelayakan 1. driling studies at the Bulan and Bintang Prospects for metallurgy and geotechnical programs in order to add data for the AMDAL study. 2. Detaied and semi-detailed geological mapping outside at the Abong Extension. 3. Soil sampling using the ridge and spur method at the Abong Extension. 4. Delivery Of drill core samples to PT Geoservices Laboratory for geochemical analysis. 5. Delivery of rock samples to PT Geoservices Laboratory for geochemical analysis. 6. Delivery of soil samples to PT Geoservices Laboratory for geochemical analysis. 7. Delivery of samples to PT Geoservices Laboratory for metallurgical analysis for preliminary metallurgical testing, Pulverized bottle roll test (PBRT). 8. Finalization of the geophysical and mineralization analysis prepared by Fathom Geophysics. 9. Finalization of the petrographic analysis conducted by Panda Geoscience. 10. Finalization of the Sinkhole, Geotechnical, Hydrological, and Hydrogeological Study reports conducted by PT Jarvis Sinergi Yasa. 11. Environmental permitting process to the central government related” to the 1
Page 11 OCR 0.917
(&D BRM Lingkungan Hidup. Environmental Feasibility Decree. Pihak-Pihak yang Terlibat Involved Parties PT Bahtera Ratu Engineering PT Geoservices PT Namsuma Luban Abadi PT Jarvis Sinergi Yasa (Geotek-hidro studi) PT Panda Geoscience PT Fathom Analysis PT Bahtera Ratu Engineering PT Geoservices PT Namsuma Luban Abadi PT Jarvis Sinergi Yasa (Geotech-hydro study) PT Panda Geoscience PT Fathom Analysis Metode Pengujian dan Pemilihan Areal Testing Method and Selection Area Specific Gravity Fire Assay CN Leach ICP OES 4 Acid Trace Uji Pulverized Bottle Roll Testwork Specific Gravity Fire Assay CN Leach ICP OES 4 Acid Trace Pulverized Bottle Roll Testwork Kemajuan Eksplorasi Terhadap Kegiatan Triwulan Sebelumnya Exploration Progress toward the Preceding Guarter Activities 1. Dalam rangka penambahan data untuk studi AMDAL, PT LMR melakukan pengeboran untuk program studi metalurgi dan geoteknik di Prospek Bulan dan Bintang dengan jumlah 76 lubang total kedalaman 2164.65 meter. Laporan studi geofisika dan mineralisasi yang disusun oleh kansultan Fathom Geophysic Laporan Studi Sinkhole, Geoteknik, Hidrologi, dan Hidrogeologi yang disusun oleh konsultan PT Jarvis Sinergi Yasa on progress. Penambahan jumlah sampel batuan inti 572 sampel yang dikirim ke Laboratorium PT Geoservices dalam periode ini. Penambahan jumlah sampel — batuan permukaan sebanyak 95 sampel yang dikirim ke Laboratorium PT Geoservices dalam periode ini Penambahan jumlah sampel tanah sebanyak 240 sampel yang dikirim ke Laboratorium PT Geoservices dalam periode ini. Melanjutkan uji metalurgi pendahuluan Pulverized bottle roll test (PBRT dari data pengeboran yang akan dianalisis oleh PT Geoservis. Mendapatkan Persetujuan Rencana Kerja dan Anggaran Biaya (RKAB) oleh Direktorat Jenderal Mineral dan Batubara. Mendapatkan SK Persetujuan Teknis tentang 1. For the purpose of additional data collection for the AMDAL study, PT LMR conducted drilling for metallurgy and geotechnical study programs at the Bulan and Bintang Prospects, with a total of 76 drill holes reaching a cumulative depth of 2, 164.65 meters. Geophysical and mineralization study report prepared by Fathom Geophysic consultants. Sinkhole, — Geotechnical, Hydrology, and Hydrogeology Study report prepared by PT Jarvis Sinergi Yasa consultants, currently in progress. An additional 572 drill core samples were collected and sent to PT Geoservices Laboratory for geochemical analysis during this reporting period. An additional 95 surface rock samples were collected and sent to PT Geoservices Laboratory for geochemical analysis during this reporting period. An additional 240 soil samples were collected and sent to PT Geoservices Laboratory for geochemical analysis during this reporting period. Continuation of preliminary metallurgical testing in the form of Pulverized Bottle Roll Test (PBRT) from drilling data, which will be analyzed by PT Geoservices. Obtained official approval of the RKAB (Work Plan and Budget) from the Directorate General of Minerals and Coal. Obtained the Technical Approval Decree on HP Aa
Page 12 OCR 0.880
(DP BRM Andalalin (Persetujuan Analisis Dampak Lalu Lintas). 10. Mendapatkan SK Persetujuan Ijin Lingkungan (Surat Keputusan Kelayakan Lingkungan 10. Andalalin (Traffic Impact Analysis Approval), Obtained the Environmental Permit Decree (SKKL). Hidup). 11. Pengajuan perpanjangan IPPKH study | 77. Submission of the application for the Pendahuluan. extension of the Preliminary IPPKH Preliminary study. Rencana Selanjutnya Next Plan 1. Melanjutkan kegiatan pengeboran studi | 7. Continuation of Phase 2 drilling studies for Tahap 2 untuk studi metalurgi dan geoteknik additional metallurgy and geotechnical tambahan di Proyek Abong. Studies within the Abong Project. 2. Melakukan pengiriman rutin sampel inti | 2 Routine delivery of drill core samples to pengeboran ke Laboratorium PT Geoservices PT Geoservices Laboratory for geachemical untuk analisis geokirnia. analysis. 3. Melanjutkan kegiatan pemetaan geologi detil | 3 Continuation of detailed and semi-detailed dan semi detil di Abong Extension. geological mapping at the Abong Extension. 4. Melakukan pengiriman rutin sampel batuan | 4, Routine delivery of surface rock samples to dan sampel tanah permukaan ke PT Geoservices Laboratory for geochemical Laboratorium PT Geoservices untuk analisis analysis. geokimia. 5. Finalisasi laporan analisis petrografi dan | 5. Ainalization of petrography and mineralisasi yang disusun oleh konsultan mineralization analysis reports prepared by Fathom Geophysic. Fathom Geophysic consultants. 6. Finalisasi Laporan hasil Uji Petrografi oleh PT | & Ainalization of petrography test report by Panda Geoscience (New Zealand) PT Panda Geoscience (New Zealand). 7. Finalisasi draft laporan Studi Sinkhole, | 7 finalization of the draft report for the Geoteknik, Hidrologi, dan Hidrogeologi yang Sinkhole, Geotechnical, Aydrology, and disusun oleh PT Jarvis Sinergi Yasa. Hyarogeology Study prepared by PT Jarvis Sinergi Yasa. 8. Melakukan uji metalurgi detail sampai | & Detaled metallurgical testing up to metode pengolahan dari data pengeboran processing methods using drilling data, dengan menggunakan jasa PT Jinpeng conducted by PT Jinpeng (China) (China). 9. Mendapatkan Persetujuan Akhir Studi| 4 Obtaining final approval of the Feasibility Kelayakan (Feasibility Study). Study (FS). 10. Pengajuan Peningkatan Tahapan IUP OP. 10. Submission of application for upgrade to IUP OP (Production Operation Mining Permit). Hambatan Eksplorasi Barriers to Exploration 1. Penambangan Tanpa Izin (PETI) di Prospek Bulan. 2. Penambangan Tanpa izin (PETI) di Area Sungai utama dengan menggunakan alat berat. 1. 2 There are Illegal Mining (PETI) activities in Bulan Prospect. There are Illegal Mining (PETI) activities in Main River with heavy eguipment (Excavator). Perizinan/Persetujuan Baru Yang Diperoleh Ne 1w Permits/Approvals Acguired 1. Persetujuan Rencana Kerja dan Anggaran Biaya (RKAB) Tahun 2025 IUP Tahap Eksplorasi PT LMR berdasarkan Surat Direktur Jenderal Mineral — dan Batubara ” Nomor B- 1 Approval of the 2025 Work Plan and Budger (RKAB) for the Exploration Phase of PT LMR based on Letter from the Director General of Minerals and Coal — Number B- Ca) an
Page 13 OCR 0.910
(&P BRM 1289/MB.04/DJB.M/2025 Agustus 2025. 2. Persetujuan Teknis Hasil Analisis Dampak Lalu Lintas Bangkitan Sedang Pembangunan Pertambangan dan Pengolahan Bijih Emas DMP Yang Terletak di Ruas Jalan Uwag (KM 379) -— BTS Aceh Tengah/Gayo Lues, Nomor Ruas 021, Desa Ise-Ise, Kecamatan linge, Kabupaten Aceh Tengah, Provinsi Aceh berdasarkan Keputusan Direktur Jenderal Perhubungan Darat Nomor KP.428/LT.408/DJPD-ANDALALIN/2025 tertanggal 26 Agustus 2025. 3. Kelayakan Lingkungan Hidup — Rencana Kegiatan Penambangan dan Pengolahan Bijih Emas DMP di Kecamatan Linge, Kabupaten Aceh Tengah, Provinsi Aceh oleh PT LMR berdasarkan Keputusan Menteri Lingkungan Hidup/Kepala Badan Pengendalian Lingkungan Hidup Republik Indonesia Nomor 1924 Tahun 2025 tertanggal 17 September 2025. tertanggal 12 128W/MB.04/DJB.M/2025 dated August 12, 2025. . Technical Approval of the Traffic Impact Analysis Results for the Medium Generation of the DMP Gold Ore Mining and Processing Project Located on the Uwag Road Section (KM 379) — BTS Aceh Tengah/Gayo Lues, Section Number 021, Ise-ise Village, Linge District, Central Aceh Regency, Aceh Province based on Decree of the Director. General of Land Transportation Number KP.428/17.408/DIPD- ANDALALIN/2025 dated August 26, 2025. . Environmental Feasibility DMP Gold Ore Mining and Processing Activity Plan in Linge District, Central Aceh Regency, Aceh Province by PT LMR based on Decree of the Minister of Environment/Head of the Environmental Control Agency of the Republic of Indonesia Number 1924 of 2025 dated September 17, 2025.
Page 14 OCR 0.899
(&P BRM V. PT Suma Heksa Sinergi Nama Perusahaan (Name of Company Tahap Kegiatan IUP (Phase of Activity of Mining Permit Laporan Eksplorasi Periode (Period of Exploration Report) PT Suma Heksa Sinergi (“PT SHS”) Operasi Produksi (Production Operation) Juli - September (/u/ - Sept) 2025 A. | Daerah Eksplorasi Exploration Areas 1. Prospek Cisadang West 1. Cisadang West Prospect 2. Prospek Pasir Karang 2. Pasir Karang Prospect 3. Regional North Pasir Karang 3. Regional North Pasir Karang B. | Biaya Eksplorasi Exploration Cost 401.492,30 Dolar AS USD 401.492,30 C. | Bentuk Kegiatan Eksplorasi Form of Exploration Activities 1. Melakukan kegiatan pengeboran di Prospek Cisadang West untuk program pemboran studi infill sumberdaya dan geoteknik. 2. Melanjutkan kegiatan pemetaan geologi detil di prospek Pasir Awi. 3. Melakukan kegiatan pemetaan geologi detil di prospek Pasir Karang. 4. Melakukan pengiriman sampel inti bor sejumlah 2882 conto dari kegiatan pemboran infill sumberdaya dan rnetalurgi di prospek Cisadang West untuk analisa geokimia (Au, Ag) dengan metode fire assay, ICP OES, dan AuCN. 5. Melakukan pengiriman conto batuan sebanyak 887 conto batuan dari prospek Pasir Awi dan Pasir Karang ke Laboratorium PT Geoservices untuk analisis geokimia. 6. Melakukan pengambilan sampel metalurgi di prospek Cisadang Central untuk uji metaturgi di laboratorium Jinpeng, China. 7. Melanjutkan studi geoteknik dan hidrogeologi dengan konsultan PT Jarvis di prospek Cisadang Central. 8. Melakukan kerjasama studi geoteknik dan hidrogeologi dengan konsultan PT Tura di prospek Cisadang West. 9. Melanjutkan proses permohonan Persetujuan Penggunaan Kawasan Hutan (PPKH) untuk eksplorasi lanjutan di area yang masih belum tercover. 1. Conducting drilling activities at the Cisadang West Prospect for infill resources and geotechnic program. . Continuing detailed geological mapping activities in Pasir Awi Prospect. . Conducting detailed geological mapping activities in Pasir Karang Prospect. 4. Sending a total of 2882 drill core samples from infill resources drilling program in Cisadang Central prospect for geochemical analysis (Au, Ag) with fire assay, ICP OES, and AuCN analysis method. . Conducting dispatched surface rock samples with total 887 rock samples from Pasir Awi and Pasir Karang prosoec and sent to PT Geoservices Laboratory for geochemical analysis. 6. Conducting metallurgical sampling from new drill core data at Cisadang Central prospect for metallurgical testing at Jinpeng Laboratory, China. Continuing geotechnic and hydrogeological study with consultants of PT Jarvis at Cisadang Central prospect. 8. Conducting to collaborate with geotechnic and hyarogeology consultants of PT Tura for study in Cisadang West prospect. . Continuing the application process for Forest Area Use Approval (PPKH) for further exploration for uncovered area. » w el S fto)
Page 15 OCR 0.904
&, 9 BRM Pihak-Pihak yang Terlibat Involved Parties 1. PT Namsuma Luban Abadi (Drilling Contractor) | 7. PT Namsuma Luban Abadi (Drilling Contractor) 2. Laboratorium PT Geoservices 2. PT Geoservices Laboratory 3. PT Indomobil Prima Energi 3. PT Indomobil Prima Energi 4. PT KehatiLab Indonesia 4. PT Kehatilab Indonesia 5. PT. Rudi Jaya Pelumas 5. PT Rudi Jaya Pelumas 65. PPSDM Geominerba 6. PPSDM Geominerba 7. PT AMS Mitra Sejahtera 7. PT AMS Mitra Sejahtera 8. CV Cipta Perdana Mandiri 8. CV Cipta Perdana Mandiri 9. CV Dwimitra Synergy 9. CV Dwimitra Synergy Metode Pengujian dan Pemilihan Areal Testing Method and Selection Area - Fire Assay - Fire Assay - Agua Regia Digest - Agua Regia Digest - ICP OES multi elemen - ICP OES multi element - CN Leach - CN Leach - Spedific Gravity - Specific Gravity Kemajuan Eksplorasi Terhadap Kegiatan Triwulan | Exploration Progress toward the Preceding Sebelumnya Guarter Activities 1. Melanjutkan kegiatan pengeboran studi metalurgi, geoteknik, dan infill sumberdaya di prospek Cisadang West menggunakan 1 Rig dan telah menyelesaikan 4 lubang bor yang terdiri dari 1 lubang studi geoteknik dan 3 lubang bor untuk infi/ sumberdaya dengan total kedalaman yang terealisasi 1178.90 meter. 2. Menyelesaikan kegiatan pemetaan geologi detil di prospek Pasir Awi. 3. Menyelesaikan kegiatan pemetaan geologi detil di prospek Pasir Karang. 4. Penambahan jumlah sampel pengeboran di prospek Cisadang Central sebanyak 2882 conto untuk analisa geokimia yang telah dilakukan analisa oleh PT Geoservices. 5. Penambahan — jumlah — sampel — batuan permukaan dari prospek Pasir Awi dan Pasir Karang sebanyak 887 conto untuk analisa geokimia yang telah dilakukan analisa oleh PT Geoservices. 6. Menyelesaikan pengambilan sampel pemboran Cisadang Central untuk uji metalurgi di laboratorium Jinpeng, China. 1. Continuing drilling program for Cisadang West Prospect for metallurgy, geotechnic, and infill resources studies drilling program used 1 Rig and already completed 4 diiliholes consisting of 1 hole for geotechnical study and 3 holes for infill resources drilling with total realized depth at 1178.90 metres. 2. Completing detailed geological mapping activities in Pasir Awi prospect. 3. Completing detailed geological exploration mapping activity in Pasir Karang prospect. 4. Additional drill core samples from Cisadang Central Prospect with total 2882 samples for geochemical analysis have been sent to PT Geoservices Laboratory. 5. Additional rock surface samples from Pasir Awi and Pasir Karang prospect with total 887 samples for geochemical analysis and have been sent to PT Geoservices Laboratory. 6. Completing metallurgical sampling from Cisadang Central prospect for metallurgical testing at Jinpeng laboratory, China. Rencana Selanjutnya Next Plan 1. Melanjutkan kegiatan pengeboran di Prospek Cisadang West untuk program pemboran metalurgi, infil sumberdaya, geoteknik, dan hidrogeologi. 1. Continue drilling activities at the Cisadang West Prospect for metallurgical, infill resources, geotechnical and hydrogeological drilling programs.
Page 16 OCR 0.905
(SD BRM 2. Melanjutkan evaluasi hasil kegiatan pemetaan Pasir Karang. 3. Melanjutkan kegiatan pemetaan regional di North Pasir Karang. 4. Melakukan uji metalurgi di prospek Cisadang West menggunakan data pengeboran terbaru. 5. Melakukan pengiriman sampel metalurgi prospek Cisadang Central ke laboraorium Jinpeng, China. 6. Melanjutkan proses permohonan Persetujuan Penggunaan Kawasan Hutan (PPKH) untuk eksplorasi lanjutan yang belum tercover dari SK KEPMEN KEHUTANAN No.450 Tahun 2025 geologi 2. Continuing evaluatian prospectivity rom detailed geologing mapping result at Pasir Karang prospect. 3. Continue regional geological exploration mapping activity In North Pasir Karang. 4. Conducting metallurgical testwork at Cisadang West prospect with new drill hole data. 5. Disoatched — metallurgical samples — from Cisadang Central prospect to the Jinpeng laboratory in China. 6. Continue the application process for Forest Area Use Approval (PPKH) for further exploration from uncovered area based on permit of SK KEPMEN KEHUTANAN No.450 2025. Hambatan Eksplorasi Barriers to Exploration Terdapat tumpang tindih dan aktifitas penambangan komoditi andesit yang berada di area prospek Pasir Karang. There are overlapping and mining activities for andesite commodity located in Pasir Karang prospect area. Perizinan/ Persetujuan Baru Yang Diperoleh New Permit/Approvals Acguired SK KEPMEN KEHUTANAN No.450 Tahun 2025 Tentang perubahan luasan PPKH No 854 Tahun 2024 tanggal 16 Juli 2024 seluas 383,87 Ha menjadi 302,22 Ha. SK KEPMEN KEHUTANAN No.450 2025 regarding revised to PPKH permit area No 854 2024 on 16 July 2024 from 383.87 Ha to 302.22 Ha. 2
Names mentioned 54 people and organisations named in the text · linked when the evidence is strong
unresolved
org
PT Citra Palu Minerals Nama Perusahaan
p.1
unresolved
org
PT Citra Palu Minerals
p.1 ×3
unresolved
org
PT Geoservices. Melakukan
p.1
unresolved
org
PT Geoservices Laboratory. Carried
p.1
unresolved
org
PT Geoservices
p.2 ×28
unresolved
org
PT Geoservices Laboratory
p.2 ×23
unresolved
org
PT CPM Laboratory
p.2 ×2
unresolved
org
PT Sumagud Sapta Sinar
p.2 ×4
unresolved
org
PT IOL Indonesia
p.2 ×2
unresolved
org
PT SN Cargo
p.2 ×2
unresolved
org
Menteri Kehutanan Republik Indonesia
p.3
unresolved
org
Minister of Forestry
p.3
unresolved
org
PT. Dairi Prima Mineral
p.4
unresolved
org
PT Dairi Prima Mineral Operasi Produksi
p.4
unresolved
org
Menteri Energi dan Sumber Daya Mineral
p.5
unresolved
org
Direktorat Jenderal Mineral
p.5
unresolved
org
PT Gorontalo Minerals Nama Perusahaan
p.6
unresolved
org
PT Gorontalo Minerals
p.6
unresolved
org
PT GM
p.6
unresolved
org
PT. Intertek
p.7
unresolved
org
PT Intertek Laboratory
p.7
unresolved
org
PT Minera Nusa Drillindo.
p.7
unresolved
org
PT Minera Nusa Drillindo. T
p.7
unresolved
org
PT Soilens.
p.8 ×2
unresolved
org
PT Solusi Geotek Optima.
p.8 ×2
unresolved
org
PT Jarvis Sinergi Yasa. TAUAWw
p.8
unresolved
org
PT Geoservices Laboratory. Laboratorium Geomekanika ITB.
p.8
unresolved
org
PT Jarvis Sinergi Yasa. NOwaw Metode Pengujian
p.8
unresolved
org
PT Linge Mineral Resources Nama Perusahaan
p.10
unresolved
org
PT Linge Mineral Resources
p.10
unresolved
org
PT LMR
p.10 ×7
unresolved
org
PT Jarvis Sinergi Yasa.
p.10 ×7
unresolved
org
PT Bahtera Ratu Engineering
p.11 ×2
unresolved
org
PT Namsuma Luban Abadi
p.11 ×4
unresolved
org
PT Panda Geoscience
p.11 ×3
unresolved
org
PT Fathom Analysis
p.11
unresolved
org
PT Fathom Analysis Metode Pengujian
p.11
unresolved
org
PT Geoservis. Mendapatkan Persetujuan Rencana Kerja
p.11
unresolved
org
PT Geoservices. Obtained
p.11
unresolved
org
PT Jarvis Sinergi Yasa. Hyarogeology Study
p.12
unresolved
org
PT Jinpeng
p.12 ×2
unresolved
org
Menteri Lingkungan Hidup
p.13
unresolved
org
Pengendalian Lingkungan Hidup Republik Indonesia
p.13
unresolved
org
Minister of Environment
p.13
unresolved
org
PT Suma Heksa Sinergi Nama Perusahaan
p.14
unresolved
org
PT Suma Heksa Sinergi
p.14
unresolved
org
PT SHS
p.14
unresolved
org
PT Jarvis
p.14 ×2
unresolved
org
PT Tura
p.14 ×2
unresolved
org
PT Indomobil Prima Energi
p.15 ×2
unresolved
org
PT KehatiLab Indonesia
p.15 ×2
unresolved
org
PT. Rudi Jaya Pelumas
p.15 ×2
unresolved
org
PT AMS Mitra Sejahtera
p.15 ×2
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
No extraction attempted yet.