Laporan Kuartalan Aktivitas Eksplorasi
Quarterly Report of the Exploration Activities

PT TBS Energi Utama Tbk
Kuartal-III/ the 3rd Quarter of 2025
Page 2
                    KATA PENGANTAR                            INTRODUCTION

    PT     TBS       Energi      Utama     Tbk    PT TBS Energi Utama Tbk ("the
    (“Perseroan”)        adalah     perusahaan    Company") is a coal mining company
    pertambangan batubara yang melakukan          conducting      mining     activities     in
    kegiatan    penambangan        di   daerah    Sangasanga area, Kutai Kartanegara
    Sangasanga,           Kabupaten       Kutai   Regency, East Kalimantan, which the
    Kartanegara, Provinsi Kalimantan Timur,       concession      area    of    the     three
    dimana area konsesi ketiga anak               subsidiaries is located side by side. All
    perusahaan       terletak    berdampingan.    the supporting infrastructure of mining
    Seluruh       infrastruktur      pendukung    operations such as coal hauling roads,
    operasional penambangan seperti jalan         offices, workshop, coal-only jetty and
    angkut       batubara,         perkantoran,   other infrastructures are located in Kutai
    perbengkelan,         pelabuhan     khusus    Kartanegara Regency, East Kalimantan.
    batubara dan infrastruktur lainnya berada
    di daerah Kabupaten Kutai Kartanegara,
    Provinsi Kalimantan Timur.

    Perseroan mempunyai 3 (tiga) anak             The Company has 3 (three) subsidiaries
    perusahaan yang bergerak di bidang            engaged in the coal mining sector,
    pertambangan batubara, terletak di            located in the Sangasanga area, Kutai
    daerah Sangasanga, Kabupaten Kutai            Kartanegara Regency, East Kalimantan.
    Kartanegara, Provinsi Kalimantan Timur.       The company's subsidiaries are:
    Adapun      ketiga   anak    perusahaan
    Perseroan tersebut adalah:                    1.​ PT Trisensa Mineral Utama (TMU)
    1.​ PT Trisensa Mineral Utama (TMU)           2.​ PT Indomining (IM)
    2.​ PT Indomining (IM)                        3.​ PT Adimitra Baratama Nusantara
    3.​ PT Adimitra Baratama Nusantara                (ABN)
        (ABN)

    Dalam rangka memenuhi Ketentuan               In order to comply with the Provisions
    III.1.6, Peraturan Nomor I-E tentang          III.1.6,   Regulation     Number     I-E
    Kewajiban     Penyampaian      Informasi,     concerning       Information    Delivery
    Lampiran Keputusan Direksi PT Bursa           Obligations, Attachment to the Decree of
    Efek            Jakarta          Number       the Board of Directors of PT Bursa Efek
    Kep-00066/BEI/09-2022      tanggal    30      Jakarta Nomor Kep-00066/BEI/09-2022
    September 2022, maka bersama ini kami         dated September 30, 2022, we here
    sampaikan Laporan Kegiatan Eksplorasi         jointly submit the Company's Exploration
    Perseroan untuk Kuartal-3 2025.               Activity Report for the 3rd Quarter of
                                                  2025.




www.tbsenergi.com
Page 3
                  BAB I                                           CHAPTER I
              PENDAHULUAN                                       INTRODUCTION




I. Latar Belakang                                 I. Background

Batubara merupakan bahan galian yang              Coal is an economically valuable excavation
bernilai ekonomis, sehingga diminati oleh         material, so it is in demand by foreign
investor asing maupun investor dalam              investors as well as domestic investors. The
negeri. Usaha pertambangan batubara               coal mining business has prospects as a
mempunyai prospek sebagai sektor andalan          mainstay sector of oil and gas replacement
pengganti    migas    dalam membangun             in building the economy of East Kalimantan
perekonomian Kalimantan Timur di masa             in the future. It is based on available coal
mendatang. Hal ini didasarkan pada sumber         resources     and     potentials, marketing
daya dan potensi batubara yang tersedia,          prospects as well as local government policy
prospek    pemasaran     serta   dukungan         support.
kebijakan pemerintah daerah.

Pengusahaan pertambangan karena sifat             Strive of the Mining business because of the
kegiatannya      pada      dasarnya      selalu   nature of its activities basically always cause
menimbulkan       perubahan       pada    alam    changes in the nature of its environment.
lingkungannya. Di balik perubahan pada            Behind the changes in nature and the
alam dan lingkungannya, suatu kenyataan           environment, it is also a fact that mining
pula bahwa usaha pertambangan telah               businesses have succeeded in improving
berhasil    meningkatkan         kesejahteraan    human welfare by providing raw materials
manusia dengan menyediakan bahan baku             for industry, energy, and others.
untuk industri, energi, dan lain-lain.




                     Gambar 1.1. Lokasi Tambang PT TBS Energi Utama Tbk
                        Image 1.1. PT TBS Energi Utama Tbk Mining Site
Page 4
Gambar 1.2. Skema Kegiatan Operasional Penambangan PT TBS Energi Utama Tbk
             Image 1.2. Scheme of Mining Operations of PT TBS Energi Utama Tbk




    Gambar 1.3. Lokasi Konsesi Ketiga Anak Perusahaan PT TBS Energi Utama Tbk
    Image 1.3. Concession area of The Three Subsidiaries of PT TBS Energi Utama Tbk
Page 5
I. 1. PT TRISENSA MINERAL UTAMA (“TMU”)

TMU merupakan perusahaan tambang            TMU is a coal mining company with an
batubara dengan daerah penambangan          administrative mining area including the
secara administratif termasuk wilayah       sub-districts of Loa Janan, Sangasanga,
Kecamatan Loa Janan, Sangasanga, Muara      Muara Jawa, Kutai Kartanegara Regency,
Jawa,    Kabupaten    Kutai Kartanegara     East Kalimantan Province with an area of
Provinsi Kalimantan Timur dengan Luas       ​3,414 ha and the 2010 KTN area code 3133
wilayah 3.414 ha dan kode Wilayah KTN        OP. TMU has received approval to carry out
2010 3133 OP. TMU telah mendapat             mining activities and sell excavated products
persetujuan untuk melakukan aktivitas        with the Decree of the Minister of
penambangan dan penjualan hasil galian       Investment/Head       of    the    Investment
dengan Keputusan Menteri Investasi/          Coordinating          Board           Number:
Kepala Badan Koordinasi Penanaman            1098/1/IUP/PMDN/2022               concerning
Modal Nomor : 1098/1/IUP/PMDN/2022           approval for granting extensions of mining
Tentang       persetujuan    Pemberian       business permits at the production operation
Perpanjangan Izin Usaha Pertambangan         activity stage for coal commodities to PT
Pada Tahap Kegiatan Operasi Produksi         Trisensa Mineral Utama (area code
untuk Komoditas Batubara kepada PT           3364023032014055) on September 21,
Trisensa Mineral Utama (kode wilayah         2022.
3364023032014055) pada tanggal 21
September 2022.

Pada     Kuartal-3   2025,    pelaksanaan   In The 3rd        Quarter of 2025, the
pekerjaan yang dilakukan oleh TMU telah     implementation of work carried out by TMU
menyerap tenaga kerja sebanyak 92 orang     has absorbed a workforce of 92 people
sedangkan      untuk    kontraktor    dan   while for contractors and sub-contractors
sub-kontraktornya 770 orang dan dibagi      770 people and divided into 2 shifts of work.
menjadi 2 shift kerja. Kontraktor tambang   The mining contractor used is PT Multindo
yang digunakan adalah PT Multindo Prima     Prima Teknik (MPT). Mining is done by
Teknik    (MPT).    Penambangan      yang   surface open pit mining system with truck
dilakukan dengan sistem tambang terbuka     and shovel method.
(surface open pit mining) dengan metode
truck dan shovel.

Produk batubara yang dihasilkan TMU         Coal products produced by TMU have an
memiliki kalori rata-rata 4500 GAR dengan   average calorie of 4500 GAR with Total
Total Sulphur (TS) di bawah 1%. Kualitas    Sulphur (TS) below 1%. The quality of this
batubara ini cukup memenuhi permintaan      coal is enough to meet the demand of the
pasar yang menginginkan batubara dengan     market who want low sulphur coal.
sulphur rendah. Pelaksanaan pengelolaan     Implementation of Occupational Safety and
Keselamatan dan Kesehatan Kerja yang        Health management implemented in TMU
diterapkan di TMU mengacu kepada            refers to the program / plan of Occupational
program/rencana Pengelolaan Keselamatan     Safety and Health Management in
dan Kesehatan Kerja sesuai dengan           accordance with applicable laws and
perundang-undangan yang berlaku.            regulations.

Kegiatan pengelolaan dan pemantauan
lingkungan yang dilakukan TMU meliputi      Environmental management and monitoring
kegiatan penghijauan yang dilakukan di      activities carried out by TMU include
Tanggul Jalan, Tanggul Stockpile, Tanggul   greening activities carried out at the Road
Page 6
Depan Timbangan, Settling Pond, Waste          Embankment, Embankment Stockpile, Front
Dump dan Bench Office Baru. Pada saat ini,     Embankment Scales, Settling Pond, Waste
TMU juga melakukan pengelolaan dan             Dump and New Bench Office. Currently,
pemantauan kualitas air, debu, kebisingan,     TMU also manages and monitors water
limbah B3 dan limbah domestik, serta           quality, dust, noise, B3 waste and domestic
pemantauan tingkat erosi.                      waste, as well as monitoring erosion rates.


I. 2. PT INDOMINING (“IM”)

Berdasarkan Izin Usaha Produksi Nomor:         Based on Production Business License
540/004/IUP-OP/MB-PBAT/III/2013 tanggal        Nomor: 540/004/IUP-OP/MB-PBAT/III/2013
15 Maret 2013, IM melakukan kegiatan           dated March 15, 2013, IM conducted coal
eksplorasi dan penambangan batubara serta      exploration and mining activities and its
hasil produksinya di daerah Kecamatan          production in Sangasanga District, Kutai
Sangasanga, Kabupaten Kutai Kartanegara,       Kartanegara Regency, East Kalimantan
Propinsi Kalimantan Timur. Tahap produksi      Province. IM's production phase began in
IM dimulai pada bulan Agustus 2007,            August 2007, while commercial production
sedangkan produksi komersial dimulai pada      began in October 2007.
bulan Oktober 2007.

Kegiatan penambangan IM dilakukan              IM mining activities are carried out by mining
kontraktor penambangan yaitu PT RPP            contractor PT RPP Contractors Indonesia
Contractors Indonesia (RCI) dan CV             (RCI) and CV Multindo Prima Teknik (MPT).
Multindo Prima Teknik (MPT). Kegiatan          Mining activities are surface open pit mining
penambangan merupakan penambangan              with truck and shovel methods.
terbuka (surface open pit mining) dengan
metoda truck dan shovel.

Pada Kuartal-3 2025, sumber daya manusia       As of 3rd Quarter 2025, human resources
yang bekerja dalam kegiatan operasional IM     working in IM's operational activities reached
mencapai 338 tenaga kerja termasuk             338 workers including contractors and
kontraktor dan subkontraktor. Dari 338 orang   sub-contractors. Of those 338 people, about
tersebut sekitar 80% merupakan tenaga          80% are local workers to support community
kerja lokal sebagai penunjang program          development programs with the aim of
community development dengan tujuan            improving the welfare of the communities
untuk      meningkatkan       kesejahteraan    around the mine.
masyarakat di sekitar tambang.

Produk batubara IM memiliki kualitas antara    IM coal products have quality between 4200
4200 - 5600 GAR dengan total sulphur           - 5600 GAR with total sulphur between 0.2%
antara 0.2% - 2.0%. Produk cukup bersaing      - 2.0%. The product is quite competitive in
di dalam pasar internasional maupun            the international and domestic markets.
domestik




I. 3. PT ADIMITRA BARATAMA NUSANTARA (“ABN”)

ABN didirikan pada tahun 2004, dan             ABN was established in 2004, and manages
mengelola daerah pertambangan dengan           a mining area of about 2,990 ha located in
luas area sekitar 2.990 Ha yang berlokasi di   Kampung Jawa Village, Sangasanga District
Desa     Kampung       Jawa,    Kecamatan      and Muara Kembang Village, Muara Jawa
Page 7
Sangasanga dan Desa Muara Kembang,             District, Kutai Kartanegara Regency, East
Kecamatan Muara Jawa, Kabupaten Kutai          Kalimantan. Based on Mining Business
Kartanegara,      Kalimantan      Timur.       License Production Operation Number:
Berdasarkan     pada      Izin    Usaha        540/1691/IUP-OP/MB-{BAT/XII/2009 dated
Pertambangan Operasi Produksi Nomor:           December 1, 2009, ABN conducts
540/1691/IUP-OP/MB-{BAT/XII/2009 tanggal       exploration, coal mining, and marketing of
1 Desember 2009, ABN melakukan kegiatan        production at its mine site.
eksplorasi, penambangan batubara, dan
pemasaran hasil produksi di lokasi
tambangnya tersebut.

ABN mulai melakukan kegiatan eksplorasi        ABN began its exploration and infrastructure
dan pembangunan infrastruktur pada tahun       development activities in 2007, while
2007, sedangkan produksi komersial dimulai     commercial production began in 2008. ABN
pada tahun 2008. Produk batubara ABN           coal products belong to thermal coal group
termasuk dalam kelompok thermal coal           with sub-bituminous and bituminous rank,
dengan      rank   sub-bituminous      dan     with 4 types of ABN 52 (CV 5200 GAR & TS
bituminous, dengan 4 jenis tipe yaitu ABN      < 1), ABN 50 (CV 5000 GAR & TS < 1),
52 ( CV 5200 gar & TS < 1), ABN 50 ( CV        ABN 42 (CV 4200 GAR & TS < 1) and ABN
5000 gar & TS < 1), ABN 42 ( CV 4200 gar       56 HS (CV 5600 gar & TS <2)). Thermal
& TS < 1) dan ABN 56 HS(CV 5600 gar &          coal is marketed to several countries in the
TS < 2)). Thermal coal dipasarkan ke           world, including India, China, Japan, Italy,
beberapa negara di dunia, diantaranya          Thailand, and Korea. ABN also supplies for
India, Cina, Jepang, Italia, Thailand, dan     domestic needs, namely cement industry
Korea.    ABN juga mensuplai untuk             and several other industries.
kebutuhan dalam negeri, yaitu industri
semen dan beberapa industri lainnya.

Sistem penambangan yang dilakukan ABN          ABN's mining system is surface open pit
yaitu sistem penambangan terbuka (surface      mining. Coal ABN has a low ash content, so
open pit mining). Batubara ABN memiliki        it is not done by washing process, only done
kandungan abu yang rendah, sehingga tidak      by crushing process. Mining activities of PT.
dilakukan pencucian (washing), hanya           ABN is carried out by one main contractor,
dilakukan proses peremukan (crushing).         PT RPP Contractors Indonesia (RCI).
Kegiatan penambangan PT. ABN dilakukan
oleh satu kontraktor utama, yaitu PT. RPP
Contractors Indonesia (RCI).

Pada Kuartal-III 2025, sumber daya manusia     In The 3rd Quarter of 2025, human resources
yang terlibat dalam kegiatan operasional       involved in ABN's operational activities
ABN mencapai sekitar 651 orang, yang           reached about 623 people, consisting of 245
terdiri dari 245 orang tenaga kerja pada ABN   workers in ABN and 406 workers in
dan 406 orang tenaga kerja pada kontraktor     contractors and sub-contractors.
maupun sub-kontraktor.


Sebagai salah satu wujud pemberdayaan          As the form of empowerment of the
masyarakat sekitar, ABN bersama-sama           surrounding community, ABN along with
dengan kontraktor dan sub-kontraktor saat      contractors and sub-contractors currently
ini telah menampung tenaga kerja lokal         have accommodated local workers in
Kecamatan Sangasanga & Kecamatan               Sangasanga District & Muara Jawa District,
Muara Jawa, Kabupaten Kutai Kartanegara        Kutai Kartanegara Regency approximately
kurang lebih 80 % dari kebutuhan tenaga        about 80% of the labor needs, while the
kerja, sedangkan sisanya sekitar 20 %          remaining about 20% comes from outside
Page 8
berasal dari luar daerah dua kecamatan   the area of the two sub-districts.
tersebut.
Page 9
               BAB II                                        CHAPTER II
        KEGIATAN EKSPLORASI                             EXPLORATION ACTIVITY




II. 1. PT TRISENSA MINERAL UTAMA (“TMU”)

1. 1. DAERAH EKSPLORASI                        1. 1. EXPLORATION AREA
Pada Kuartal-3 2025 kegiatan eksplorasi        In the 3rd Quarter of 2025, exploration
berupa kegiatan sampling di Pit Aktif yaitu    activities will be in the form of sampling
pit B1WA, 5B18.                                activities in Active Pits, namely pit B1WA,
                                               5B18.
Kegiatan pemboran cropline untuk seam R,
S, T di blok 2 dan 3. Kegiatan ini bertujuan   Cropline drilling activities for seams R, S, T
untuk mencari kemenerusan seam -seam,          in blocks 2 and 3. This activity aims to find
Ketebalan, data Top of Coal (zona              the continuity of the seams, thickness, Top
pelapukan) tersebut ke arah selatan.           of Coal data (weathering zone) to the south.
Rencana pemboran cropline ini berjumlah        The plan to drill this cropline consists of 68
68 titik bor dengan total kedalaman 1000       drill points with a depth of 1000 meters.
meter.
                                               Coal sampling activities in active pits to
Kegiatan sampling batubara di pit aktif guna   determine the quality value, especially the
mengetahui nilai kualitas nya terutama nilai   total sulphur (TS) value and total calorie
total sulphur (TS) dan nilai total kalori.     value. coal sampling activities. The target
kegiatan sampling batubara. Seam target        seam is the T, RU, RL, S, ZA, Z, Y, X seams
adalah seam T, RU, RL, S, ZA, Z, Y, X di pit   in pit B1WA. sampling in pit 5B18 with seam
B1WA. sampling di pit 5B18 dengan seam         target seam 18.
target seam 18.

1. 2. METODE PENGUKURAN                        1. 2. MEASUREMENT METHODS

Trenching                                      Trenching

Secara teknis di lapangan tim geologist        Technically in the field, the geologist team
melakukan trenching dengan membuat             conducted trenching by making an
paritan memanjang memotong strike seam –       elongated trench cutting the strike seam –
seam target sebatas titik plan yang dibuat     seam target to the point plan made earlier.
sebelumnya. Hal ini berfungsi untuk            This serves to cover the entire region so that
mengcover seluruh wilayah agar semua           all seams can be found. The average length
seam dapat ditemukan. Rata – rata panjang      of trenching in a day can reach 80 m -100 m
paritan trenching dalam sehari bisa            depending on the terrain/ area of work
mencapai 80 m - 100 m tergantung dari          whether in a ramp, swamp or hilly with a
medan/areal kerjanya apakah di tempat          steep slope.
landai, rawa atau berbukit dengan
kemiringan terjal.

Pengambilan sampel untuk di mengetahui         Sampling to find out the values of quality is
nilai –nilai kualitasnya dilakukan per jarak   done per distance of 100 m between
100 m antar lubang trenching.                  trenching holes
Page 10
Sampling                                        Sampling

Tim geologi juga melakukan sampling seam        Geologies team also sampling seams in the
–seam di pit guna mengetahui kualitas ter       pit to find out the updated quality of the
update dari seam – seam yang akan               seams that will be mine.
ditambang.                                      The methods used are:
Metode yang digunakan adalah:


Pemboran Cropline                               Cropline Drilling

Tim geologi membuat rencana pemboran            The geological team made a plan to drill a
cropline dengan jarak 50 meter searah strike    cropline with a distance of 50 meters in the
seam.                                           direction of the strike seam.

Pengeboran    ini baru    dimulai awal          This drilling will only start in early September
September 2025 dan ditargetkan selesai          2025 and is targeted to be completed in
pada bulan November 2025.                       November 2025.


Target kedalaman harian adalah sebesar 15       The daily depth target is 15 meters.
meter.

Jika dalam pengeboran ini tidak ditemukan        If in this drilling no seam is found that is the
seam yang menjadi target maka titik bor         target, the drill point will be shifted
akan di geser tegak lurus dengan strike yaitu   perpendicular to the strike, namely west or
arah barat atau timur tepatnya arah N 110°      east, precisely in the direction of N 110° E or
E atau N 290 °S. Jarak pergeseran ini akan      N 290 °S. This shift distance will be claimed
di klaim oleh geologist berdasarkan acuan       by the geologist. Based on lithological
litologi yang di dapat dibandingkan dengan      references, it can be compared with
urutan litologi yang sudah ada sebelumnya       pre-existing lithological sequences, for
misalnya dari data pemboran eksplorasi          example from exploration drilling data or
atau data geofisikal logging.                   geophysical logging data.

   1.​ Jarak antar titik sampling maksimal
       20 m per seam searah strike bukaan         1.​ The distance between sampling points
       batubara yang akan diambil (getting).          maximum 20 m per seam direct strike
                                                      coal openings to be taken (getting).

   2.​ Sampling ulang/update pada tiap            2.​ Re-sampling/update on each new layer
       bukaan layer baru pada suatu seam              opening on a seam (maximum 1 layer
       (maksimal 1 bukaan layer setinggi 3            opening as high as 3 m).
       m).

   3.​ Sampling pada seam – seam bukaan           3.​ Sampling on seam – seam new
       baru/seam yang pertama kalinya                 openings/ seam the first time will be in
       akan di getting. Adapun plan                   getting. The mining plan until the end
       penambangan sampai dengan akhir                of the year is targeted at seam with
Page 11
      tahun ditargetkan pada seam dengan                calorie value (ar)_g above 4500..
      nilai Calori (ar)_g di atas 4500.


1. 3. BIAYA EKSPLORASI                             1. 3. EXPLORATION COSTS
Biaya Eksplorasi TMU yang dikeluarkan di           TMU Exploration Costs incurred in the 3rd
Kuartal-3 2025 sebagai berikut:                    Quarter of 2025 as follows:


                                       Q3 2025                     Year To Date
       Biaya Operasional       Anggaran      Realisasi        Anggaran      Realisasi
       Operating Expense        Budget      Realization        Budget      Realization
                                 (IDR)         (IDR)            (IDR)         (IDR)
      Juli / July             112,500,000      12,500,000     450,000,000     60,000,000
      Agustus / August        112,500,000       2,500,000     450,000,000     62,500,000
      September /
                              112,500,000          -          450,000,000     62,500,000
      September


Catatan:                                           Note:
Jumlah sampling       di   Kuartal-3   2025        The number of samplings in The 3rd Quarter
berjumlah 6 sampel.                                2025 amounted to 6 samples

Biaya Eksplorasi untuk tahun 2025 yang             Exploration Cost for 2025 in accordance with
sesuai dengan RKAB 2025 bagian geologi             RKAB 2025 geological section in the form of
berupa biaya analisa kualitas batubara di          coal quality analysis cost at laboratory
laboratorium maksimal 14 sampel/bulan.             maximum 14 samples per month. The cost
Biaya untuk kegiatan trenching yang                for trenching activities that use PC 200 units
menggunakan unit PC 200 biayanya                   is accommodate to production department
dimasukkan ke departemen produksi untuk            for general work with a record of trenching
pekerjaan general dengan catatan kegiatan          activities on the unit usage timesheet.
trenching pada lembar timesheet pemakaian
unit.


1. 4. PELAKSANAAN DAN                              1. 4. IMPLEMENTATION AND​
      PENGAWASAN                                         SUPERVISION
Pengawasan      Test    Pit/Trenching  dan         Supervision of Test Pit/ Trenching sampling
sampling batubara di pit TMU dilakukan oleh        of coal in the TMU pit conducted by
Geologist TMU.​    ​                               TMU’geologist.

1. 5. KEMAJUAN EKSPLORASI                          1. 5. EXPLORATION PROGRESS
Kesimpulan Eksplorasi TMU Kuartal-2                Conclusion of TMU Exploration in the 3rd
2025                                               Quarter of 2025

Selain kegiatan trenching kami dari tim            In addition to our trenching activities from
geologi juga melakukan sampling seam               the geology team also sampling seam-seam
–seam di pit guna mengetahui kualitas ter          in the pit to find out the update quality from
update dari seam – seam yang akan di               seam - seam to be getting. The methods
getting. Metode yang digunakan adalah:             used are:

1.​ Jarak antar titik sampling maksimal 50 m       1.​ Distance between sampling points
    per seam searah strike bukaan batubara             maximum 50 m per unidirectional strike
    yang akan diambil (getting).                       coal openings to be taken (getting)
Page 12
2.​ Sampling ulang/update pada tiap bukaan     2.​ Sampling/update on each new layer
    layer baru pada suatu seam (maksimal 1         opening on one seam (maximum 1-layer
    bukaan layer setinggi 3 m).                    aperture as high as 3 m).

3.​ Sampling pada seam – seam bukaan
    baru/seam yang pertama kalinya akan di     3.​ Sampling on seam - seam new openings
    getting. Adapun plan penambangan               / seam the first time will be in the getting.
    sampai dengan akhir tahun ditargetkan          The mining plan until the end of the year
    pada seam dengan nilai Calori (ARB)            is targeted at seam with calorie (ARB)
    GAR di atas 4800.                              GAR value above 4800.

4.​ Selama Kuartal-3 2025 kegiatan berupa
    sampling pit aktif yaitu di pit 5B18       4.​ During The 3rd 2025, activities in the form
    dengan seam target adalah seam 18 .Pit         of active pit sampling are in pit 5B18 with
    B1WA dengan seam target T, RU, RL,             target seam is 18 Pit B1WA with target
    S, Y, ZA, Z, X.                                seam T, RU, RL, S, Y, ZA, Z, X.

5.​ Rata – rata hasil analisa kualitas dari
    seam –seam tersebut di atas TM             5.​ The average quality analysis results of
    29.17%, ASH 6.50 %, TS 0.20 % dan              the seam -seam above TM 29.17 %,
    nilai CAL (ar) 4.300.                          ASH 6.50%, TS 0.20 % and CAL (ar)
                                                   values 4.300.
6.​ Adapun realisasi pengeboran sampai
    kuartal ini berjumlah 7 titik bor dengan   6.​ The drilling realization until this quarter
    total kedalaman 102.50 m . Titik bor           amounted to 7 drill points with a total
    yang berhasil mendapatkan seam target          depth of 102.50 m. The drill points that
    berjumlah 3 titik bor dan yang tidak           successfully get the target seam are 3
    berjumlah 4 titik bor.                         drill points and those that do not amount
                                                   to 4 drill points


1. 6. RENCANA KEGIATAN​                        1. 6. PLANS FOR FURTHER​
      EKSPLORASI SELANJUTNYA                         EXPLORATION ACTIVITIES
Rencana Kegiatan Divisi Geologi Kuartal-4      The Geological Division Plan for 4th Quarter
2025:                                          2025:

1.​ Melakukan pembaharuan / updating           1.​ Updating the Geological model based on
    model    Geologi    berdasarkan    data        monthly roof/floor updating data from pit
    updating roof/floor bulanan dari data          survey data and cs holes data from coal
    survey Pit serta cs_holes dari data            sampling channel data. The results of
    channel sampling batubara. Hasil dari          this model update are then sent to the
    pembaharuan model ini kemudian dikirim         mine plan engineering section as a basis
    ke bagian mine plan engineering sebagai        for submissions for making pit designs
    dasar acuan untuk pembuatan desain pit         for next month.
    untuk bulan depan.

2.​ Trenching di luar Rencana PIT yang di      2.​ Trenching outside the PIT Plan that is
    Plan kan oleh tim Engineering di               planned by the Engineering team is not
    tiadakan dan sebagai penggantinya              in place and in lieu of trenching is done in
    adalah trenching di lakukan di plan pit        the plan pit whose trenching data is
    yang data trenchingnya kurang atau             lacking or confidence level of continuity,
    tingkat    confidence    kemenerusan,          seam thickness in the pit is still lacking.
    ketebalan seam di pit tersebut masih
Page 13
   kurang.

3.​ Memonitoring adanya anomali        pada    3.​ Monitoring the presence of anomalies in
    suatu bukaan PIT yang aktif.                   an active PIT aperture.

4.​ Tim geologist akan melakukan sampling      4.​ The geological team will be sampling the
    pada bukaan seam seam yang berada di           seam seam openings located in the
    pit aktif terutama mengontrol perubahan        active pit, especially controlling changes
    nilai Total Sulfur, Persentase nilai Ash       in the value of Total Sulphur, Ash percent
    dan nilai Kalori di seam –seam berkalori       value and value of Calorie in seam
    tinggi baik ke arah down dip maupun ke         -seam with high calories both down dip
    arah strike nya.                               towards his strike.


5.​ Memonitoring kualitas dari seam –seam      5.​ Monitoring the quality of seam -seam that
    yang tertambang di bulan Oktober –             is mined in July until September 2025,
    Desember 2025 terutama dalam hal               especially in terms of changes in TS
    perubahan nilai TS seiring penurunan           value in line with the decrease in
    elevasi dari masing –masing seam yang          elevation of each seam that is mined.
    tertambang.

6.​ Update data kualitas berdasarkan           6.​ Quality data update based on mining
    kemajuan     penambangan         pada          progress on seam–seam target in
    seam–seam target di bulan sebelumnya.          previous month.


7.​ Rencana        kegiatan     pengeboran     7.​ The plan for exploration drilling activities
    eksplorasi di tahun 2025 sebanyak 78           in 2025 is 78 drill points or as many as
    titik bor atau sebanyak 9.360 m di             9,360 m in the western area of the B3KL
    wilayah barat pit B3KL dengan seam             pit with seam Target seam R, S, T, U,
    Target seam R, S, T, U, WA, WB, X, Y.          WA, WB, X, Y.


8.​ Rencana kegiatan pengeboran geoteknik      8.​ The plan for geotechnical drilling
    di tahun 2025 sebanyak 5 titik pemboran        activities in 2025 is 5 drilling points or as
    atau sebanyak 600 m di wilayah Barat pit       much as 600 m in the Western area of
    B3KL.                                          the B3KL pit.

9.​ Melanjutkan pengeboran cropline sampai     9.​ Continue cropline drilling until November
    bulan November 2025 sebanyak 100               2025 as many as 100 meters with the
    meter dengan target utama adalah seam          main target being seams R, S and
    R, S dan T.


II. 2. PT INDOMINING (“IM”)

2. 1. DAERAH EKSPLORASI                        2. 1. EXPLORATION AREA
Pada Kuartal-3 2025, IM tidak ada kegiatan     In the 3rd Quarter of 2025, IM had no drilling
pemboran.                                      activities.

2. 2. METODE PENGUKURAN                        2. 2. MEASUREMENT METHODS
Untuk     kegiatan    pemboran    infill       For infill drilling activities using touch coring
menggunakan     metode   touch coring,         method, while for geotechnical drilling is
sedangkan untuk pemboran geoteknik             done by drilling Full Coring method.
Page 14
dilakukan dengan pemboran metode Full
Coring.

Pemboran geoteknik dilakukan juga dengan         Geotechnical drilling is also carried out using
menggunakan metode Standard Penetration          the Standard Penetration Test (SPT)
Test (SPT). Prinsip kerja SPT adalah             method. The working principle of SPT is to
dengan memukul sebuah tabung standar ke          hit a standard tube into a drill hole 45 cm
dalam lubang bor sedalam 45 cm                   deep using a hammer weighing 63.5 KG that
menggunakan palu dengan berat 63.5 KG            falls freely from a height of 76 cm. What
yang jatuh bebas dari ketinggian 76 cm.          counts is the number of blows to penetrate
Yang dihitung adalah jumlah pukulan untuk        as deep as 15 cm. The number of blows
melakukan penetrasi sedalam 15 cm.               used is penetration as deep as the last 30
Jumlah pukulan yang digunakan adalah             cm.
penetrasi sedalam 30 cm terakhir.



2. 3. BIAYA EKSPLORASI                           2. 3. EXPLORATION COSTS
Biaya Eksplorasi IM yang dikeluarkan di          IM Exploration Costs incurred in the 3rd
Kuartal-3 2025 sebagai berikut:                  Quarter of 2025 as follows:


                                          Q3 2025               Year To Date
           Biaya Operasional       Anggaran Realisasi      Anggaran     Realisasi
           Operating Expense         Budget   Realization   Budget      Realization
                                      (IDR)      (IDR)       (IDR)        (IDR)
        Juli / July                83,333,333       -     583,333,331        -
        Agustus / August           83,333,333       -     666,666,664        -
        September / September      83,333,333       -     749,999,997        -



2. 4. PELAKSANAAN DAN                            2. 4. IMPLEMENTATION AND​
      PENGAWASAN                                        SUPERVISION
Kegiatan    Pemboran     diawasi     oleh        Drilling activities are supervised by the
Departemen Engineering Section Geologist.        Department       of Engineering geologist
                                                 section.

2. 5. KEMAJUAN EKSPLORASI                        2. 5. EXPLORATION PROGRESS
Pada Kuartal-3 2025 belum ada kegiatan           As of The 3rd Quarter of 2025, there are no
pemboran lanjutan. Namun ada beberapa            further drilling activities. But there are
kegiatan Geologi yang berlanjut dilakukan,       several geological activities that continue to
diantaranya:                                     be carried out, including:

1.​ Melakukan     pembaharuan/       updating    1.​ Updating the Geological model based on
    model    Geologi     berdasarkan     data        monthly roof/floor updating data from pit
    updating roof/ floor bulanan dari data           survey data and cs_holes data from coal
    survey Pit serta cs_holes dari data              sampling channel data, and supervision
    channel    sampling      batubara,    dan        in the activities of taking roof/floor
    pengawasan          dalam        kegiatan        measurement data and cs_holes.
    pengambilan data pengukuran roof/floor
    serta cs_holes tersebut.
Page 15
2.​ Melakukan kegiatan channel sampling            2.​ Conducting channel sampling activities
    serta pengukuran tebal aktual batubara             as well as actual thick measurement of
    di lokasi Pit AB Blok 14-16 & sekitarnya           coal at the pit AB location Block 14-16 &
    untuk     keperluan   pembuatan     data           surrounding areas for the purposes of
    channel      sampling   untuk   support            making data sampling channels to
    pembaharuan / updating model Geologi               support the renewal / updating of
    dan variasi kualitas batubara dari coal            geological models and variations in the
    inventory yang akan ditambang.                     quality of coal from coal inventory to be
                                                       mined.

3.​ Melakukan analisis kestabilan lereng di        3.​ Perform slope stability analysis in the pit
    area pit aktif Pit, baik pada sisi low wall,       active pit area, both on the low wall side,
    high wall maupun sidewall serta disposal           high wall and sidewall and disposal IPD
    IPD border Selatan, kaitannya untuk                South border, related to know the value
    mengetahui nilai safety factor (FoS)               of safety factor (FoS) to control the
    untuk kontrol pembentukan desain Pit               formation of Active Pit design to be
    Aktif supaya stabil dan aman.                      stable and safe.

2. 6. RENCANA KEGIATAN​                            2. 6. PLANS FOR FURTHER​
      EKSPLORASI SELANJUTNYA                             EXPLORATION ACTIVITIES
IM pada periode Kuartal-4 2025 belum               IM for 4th Quarter of 2025 has not planned to
merencanakan melakukan aktifitas kembali           resume further exploration drilling activities,
pengeboran eksplorasi lanjutan, baik itu           be it infill drilling or Geotechnical drilling in
pengeboran infill maupun pengeboran                IM concession area.
Geoteknik di area konsesi IM.

Sehubungan             dengan        rencana       In relation to the mining optimization plan at
pengoptimalan penambangan pada pit                 Indomining's main pit to a depth of RL-160
utama Indomining hingga kedalaman                  meters according to the Mine Plan target for
RL-160 meter sesuai target Mine Plan untuk         the IM pit and in order to optimize the
pit IM dan dalam rangka mengoptimalkan             mineable reserve of potential seams, the
mineable reserve seam-seam potensial,              quality and quantity of exploration data
kualitas dan kuantitas jumlah data eksplorasi      owned by PT Indomining through the current
yang dimiliki oleh PT Indomining melalui           geological       model      are     sufficiently
model geologi saat ini sudah cukup mewakili        representative and meet the number of
serta memenuhi dengan jumlah distribusi            distribution of existing boreholes very well to
titik – titik bor yang ada sangat baik untuk       cover the optimization of coal reserves in the
mengcover optimasi cadangan batubara               planning of the mining process of the PIT
dalam perencanaan proses penambangan               design geometry during the period for 2025.
geometri desain PIT selama periode untuk
Tahun 2025.

II. 3. PT ADIMITRA BARATAMA NUSANTARA (“ABN”)

3. 1. DAERAH EKSPLORASI                            3. 1. EXPLORATION AREA
Pada Kuartal-III 2025, ABN melakukan               In the 3rd Quarter of 2025, ABN conducted
update model geologi berdasarkan data              geological model updates based on channel
channel sampling serta data roof & floor           sampling data as well as actual roof & floor
aktual dari hasil pengukuran survey, serta         data from survey measurement results, as
melakukan rekonsiliasi model geologi               well as reconciling geological models to
terhadap data survey aktual.                       actual survey data.

Selain kegiatan eksplorasi di dalam konsesi        Apart from exploration activities within the
IUP ABN, tim eksplorasi juga melakukan             ABN IUP concession, the exploration team
Page 16
studi prospeksi dan review terhadap potensi     also carried out prospecting studies and
pengembangan bahan galian di luar IUP           reviews of the potential for developing
ABN. Pada kuartal-III, tim eksplorasi telah     minerals outside the ABN IUP. In the 3rd
menyelesaikan sebanyak 2 desk studi             Quarter, the exploration team completed 2 of
prospeksi terhadap potensi Batubara             prospecting studies on the potential coal.


3. 2. METODE PENGUKURAN                         3. 2. MEASUREMENT METHODS
Channel     sampling   dilakukan     dengan     Channel sampling is done by mapping and
mapping dan pengukuran aktual batubara          actual measurement of coal that has been
yang telah terekspos (thickness, strike, dip,   exposed (thickness, strike, dip, collar) then
collar) kemudian diambil sampel secara          taken composite sample to be analyzed coal
komposit untuk dilakukan analisa kualitas       quality as the basis for geology model
batubara sebagai dasar untuk update model       update in line with the progress of the mine.
geologi seiring dengan kemajuan tambang.        Channel sampling in the 3rd Quarter of 2025
Chanel sampling pada Kuartal-III 2025           was conducted at seam S41, S42, S43U at
dilakukan pada seam S41, S42, S43U pada         Pit 6
Pit 6

3. 3. BIAYA EKSPLORASI                          3. 3. EXPLORATION COSTS
Biaya Eksplorasi ABN yang dikeluarkan di        ABN Exploration Costs issued in The 3rd
Kuartal-3 2025 sebagai berikut:                 Quarter of 2025 as follows:


              Biaya                 Q3 2025                     Year To Date
         Operasional        Anggaran      Realisasi       Anggaran       Realisasi
            Operating        Budget       Realization      Budget       Realization
             Expense          (IDR)         (IDR)           (IDR)          (IDR)
      Juli / July          250.000.000   81.666.667     1.138.000.000    206.666.667
      Agustus / August     250.000.000   245.000.000    1.388.000.000    451.666.667
      September /                        245.000.000
                           250.000.000                  1.638.000.000      696.666.667
      September



3. 4. PELAKSANAAN DAN                           3. 4. IMPLEMENTATION AND​
      PENGAWASAN                                      SUPERVISION
Kegiatan dilaksanakan dan diawasi oleh          Activities are carried out and supervised by
Departemen Mining section Geotech &             the Department of Mining section Geotech &
Exploration Development.                        Exploration Development.

3. 5. KEMAJUAN EKSPLORASI                       3. 5. EXPLORATION PROGRESS
Pada Kuartal-III 2025 tidak ada kegiatan        In The 3rd Quarter of 2025, there are no
pemboran    eksplorasi,   namun berikut         exploration drilling activities, but the
kegiatan team geologi selama Kuartal-III        following are the activities of the geological
2025:                                           team during the 3rd Quarter of 2025:

1.​ Melakukan monitoring di area Pit Aktif,     1.​ Monitoring the Active Pit area, both slope
    baik   monitoring     kestabilan lereng         stability monitoring and coal monitoring to
    maupun monitoring batubara untuk                monitor the suitability between geological
    memantau kesesuaian antara Model                models and actual in the field.
    Geologi & aktual di lapangan.               2.​ Geological Model Update based on coal
2.​ Update Model Geologi berdasarkan data           roof/floor data from actual survey data
Page 17
    roof/floor batubara dari data survey            and drilling data.
    actual dan dari data pemboran               3.​ Analysis of slope stability in low wall pit
3.​ Analisa kestabilan lereng di area Low           area active & disposal area.
    Wall Pit Aktif & area disposal.             4.​ Pit and disposal slope stability monitoring
4.​ Monitoring kestabilan lereng untuk pit          using monitoring point prism and SSR
    dan disposal dengan titik pantau prisma         (Slope Stability Radar).
    dan SSR (Slope Stability Radar).            5.​ Follow up on several potential IUP for
5.​ Menindaklanjuti beberapa IUP yang               detailed exploration.
    potensial untuk dilakukan eksplorasi
    detail.


3. 6. RENCANA KEGIATAN​                          3. 6. PLANS FOR FURTHER​
      EKSPLORASI SELANJUTNYA                           EXPLORATION ACTIVITIES

Rencana ABN pada periode Kuartal-IV 2025         In the 4th Quarter of 2025, ABN has plans for
ada kegiatan pemboran infill & pemboran          infill drilling & depressurization drilling Pit 6.
depresurisasi Pit 6. Selain itu kegiatan         However, exploration activities are also
eksplorasi dan geologi juga difokuskan pada      focused on the following activities:
kegiatan berikut:
                                                 1.​ Sampling for coal quality updates &
1.​ Pengambilan sampel untuk update                  geological models in the Active Pit area.
    kualitas batubara & model geologi di         2.​ Monitoring in the Active Pit area to
    area Pit Aktif.                                  monitor the suitability between actual and
2.​ Monitoring di area Pit Aktif untuk               Geological Models in the field.
    memantau kesesuaian antara Model             3.​ Update geological model based on
    Geologi dan aktual di lapangan.                  sampling channel, actual survey data
3.​ Melakukan update Model Geologi                   and drilling data.
    berdasarkan data channel sampling, data      4.​ Reconciliation between Geological Model
    survey aktual dan data pemboran.                 to actual survey data.
4.​ Rekonsiliasi antara Model Geologi            5.​ Geotech monitoring in Pit & Disposal
    terhadap data survey actual.                     Area.
5.​ Monitoring geotek di area Pit & Disposal.    6.​ Slope stability analysis for Pit and
6.​ Analisa kestabilan lereng pit dan                Disposal.
    disposal.                                    7.​ Monitoring point installation for slope
7.​ Pemasangan monitoring point untuk                movement monitoring program.
    pemantauan pergerakan lereng.

File

File Open PDF
Source IDX
Size1.41 MB
Published7 Oct 2025
Pages17
Characters46,110
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 14 people and organisations named in the text · linked when the evidence is strong

linked org TBS Energi Utama Tbk p.1 ×24
unresolved org PT Trisensa Mineral Utama p.2 ×4
unresolved org PT Indomining p.2 ×6
unresolved org PT Adimitra Baratama Nusantara p.2 ×4
unresolved org Menteri Investasi p.5
unresolved org Koordinasi Penanaman p.5
unresolved org PT Multindo p.5
unresolved org PT Multindo Prima p.5
unresolved org PT RPP p.6
unresolved org PT RPP Contractors Indonesia Contractors Indonesia p.6
unresolved org PT RPP Contractors Indonesia p.7 ×2
unresolved org PT. ABN p.7
unresolved org Departemen Engineering Section Geologist. p.14
unresolved org Departemen Mining p.16

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result