Source file signed link, expires in 15 minutes
Extracted text 24
Page 1
PT Radiant Utama Interinsco Tbk Public Expose 2025 9 October 2025
Page 2
Agenda Company Overview Key Highlights Operational Highlights Financial Performance Sustainability
Page 3
PUBLIC EXPOSE 2025 Company Overview
Page 4
Company Overview
AIS OM&ES OFS
Asset Integrity Solution Operation Maintenance Offshore Facility Services
& Engineering Services
The integrity of your assets is paramount to Our comprehensive Operation Maintenance & Radiant operates strategic businesses in
the success of your operations in energy Engineering Services are designed to enhance the Mobile Offshore Production Unit (MOPU) and
sector. Our comprehensive Asset Integrity reliability, efficiency, and safety of your assets, Marine Services to support the offshore oil and
Services are designed to enhance safety, ensuring that your operations run smoothly and gas industry. MOPU services provide efficient
without interruption. From routine maintenance oil and gas production solutions, while Marine
optimize performance, and extend the
to complex engineering projects, we offer tailored Services manage support vessel fleets to
lifespan of your critical infrastructure.
services that meet your specific needs and ensure safe and reliable operations. These
operational goals. services strengthen the company’s position as
a trusted partner in the energy sector.
Page 5
Vision, Mission, and Core Values
VISION “To be a leader in Asset Integrity and Integrated Engineering Operational Solutions,
Prioritizing Safety, Value Creation, and Energy Transition”
MISION • Deliver Excellence in Asset Integrity
• Integrated Engineering & Operational Solutions
• Collaboration for Innovation and Technology Adoption
• Commitment to Safety and Highest Standards
• Focus on ESG and Sustainable Energy Transition
CORE • Employee Well-being and Development
VALUES
I N S A N
Integrity iNnovative Strive for Collaboration Agile & Resilience Noble & Care
Integrity as the fundamental Continuous innovation that Inclusive Collaboration in The ability to remain A commitment to
foundation to ensure ethical drives value creation to building a productive resilient and adaptive environmental, social, and
and transparent actions in all address business challenge internal and external amidst business pressures overall business
activities in an era of change ecosystem and competition ecosystem sustainability
Page 6
PUBLIC EXPOSE 2025 Key Highlights
Page 7
Board of Management
BOARD OF COMMISSIONERS BOARD OF DIRECTORS
Misyal A. Bahwal Amira Ganis Nino Fediawan K Zaki Maulana Aby Abdullah Ganis Soeharto Nurcahyono
Commissioner President Commissioner Independent Commissioner Director President Director Director
VICE PRESIDENTS
Ilham Santoso Syahrul Syam Agung Ady Saputra Ramzy S. Amier Mona Nazaruddin Ari Wibowo
VP Asset Integrity Service VP Operation Maintenance & VP Offshore Facility Service VP QSHE & Compliance VP Corsec & Legal VP Shared Service
Engineering Service
Page 8
Awards & Achievements
2nd Best Health Performance 3rdBest Health Performance Excellent Safety & Outstanding Performance
(High Risk Contract) (Medium Risk Contract) Operation Contribution & Appreciation 3rd Best Contractor
Januari 2025 Januari 2025 Januari 2025 Januari 2025 Februari 2025
PT Pertamina Hulu Indonesia PT Pertamina Hulu Indonesia PT Pertamina Hulu Energi OSES RH Petro Gas Limited PT Pertamina Hulu Rokan
Best Vendor – Silver Award Best of Service Provider Best Supplier Performance Best Contractor
Mei 2025 Juli 2025 Juli 2025 September 2025
PT PLN Mandau Cipta Tenaga Nusantara PT Elnusa Trans Samudra PT Pertamina EP Cepu Pertamina Hulu Rokan
Page 9
Partnership & Collaboration
15 January 2025 25 February 2025 23 June 2025 21 August 2025
Signing of Memorandum of Understanding PT Radiant Utama Interinsco Tbk signed PT Supraco Daya Wisesa (SDW), PT PT Radiant Utama Interinsco Tbk has
(MoU) between Radiant Utama Interinsco a Memorandum of Understanding (MoU) Lembata Hira Sejahtera (BATARA) and officially signed a Memorandum of
Tbk, PT Daemeter Consulting, PT Supraco with the Center for Material Processing FAIRATMOS have formally signed a Understanding (MoU) and a Non-
Daya Wisesa, and PT Lembata Hira and Failure Analysis (CMPFA-FT UI) to Memorandum of Understanding (MoU), Disclosure Agreement (NDA) with
Sejahtera (BATARA), reaffirming their joint strengthen collaboration in material reaffirming their joint commitment to Vision Petroleum International Sdn.
commitment to sustainable development processing and failure analysis. environmental conservation, community Bhd, making the start of a strategic
and industry collaboration resilience, and industry collaboration. partnership in oil recovery, water
injection, and engineered chemistry
solutions.
Key Partners: Associations:
APMI
Page 10
PUBLIC EXPOSE 2025 Operational Highlights
Page 11
New Win & Active Projects
New Win Projects Active Projects (multi years)
Projects Value
Q2-2025: Rp 1.311 tn Projects Value
(Q2-2024: Rp 673 tn | FY2024: Rp1.598 tn) Rp 6.964 tn
Quantity
Quantity
357 projects
332 projects
(Q2-2024: 270 projects | FY2024: 533 projects)
Asset Integrity Offshore Services Asset Integrity Offshore Services
Inspection 1 Projects Inspection 8 Projects
268 Projects Rp 4 bn 211 Projects Rp 2.484 bn
Rp 312 bn Rp 969 bn
Operation &
Operation & Maintenance
Maintenance 112 Projects
88 Projects Rp 3.509 bn
Rp 995 bn
Page 12
Active Projects
82 54
Projects
Projects
9 14
Projects
Projects
171 2
Projects Projects
By Business Unit By Industry Top 10 Clients
332 34,6% 4,3%
Active Projects (Juni 2025) 4,0%
OFS
35,67% 3,9%
Rp6.964 tn OMES
2,7%
Migas; Non-Migas; 1,5%
Contract Value (multi years) 50,39% 92,3% 7,7% 1,5%
9,3%
Rp17.1 bn 35,5% 1,3%
AIS 1,3%
Capex
13,91%
Page 13
Project Highlights: Regular Maintenance
Inspection, Certification, Callibration Provision of Lifting Equipment Blasting, Coating, & Maintenance
& Engineering Services Maintenance Services Services
INSERT PICTURE INSERT PICTURE
Client: Pertamina EP Client: ENI Muara Bakau B.V Client: PT Citra Tubindo Tbk
Location: East Kalimantan Location: East Kalimantan Location: Batam, Riau Island
Project Duration: Apr ‘25 – Jun ‘27 Project Duration: Jan ’25 – Jan ‘28 Project Duration: Jan ’25 – Dec ‘26
This project focuses on delivering inspection, This project focuses on delivering preventive and This project focuses on delivering blasting, coating,
certification, and calibration services supported corrective maintenance for lifting equipment, and maintenance services to ensure the protection
by engineering solutions to ensure equipment including inspection, testing, and certification to and long-term durability of tubular and industrial
accuracy, safety, and compliance. ensure safety and reliability in offshore operations. equipment..
Page 14
Project Highlights: Continuous Improvement
Long Range Ultrasonic Testing (LRUT) Drilling and WOWS Operation RBI Inspection
Inspection Services for WK Rokan Services
INSERT PICTURE INSERT PICTURE
Client: Pertamina Hulu Rokan Client: Petrogas (Basin) Ltd Client: PT Chandra Asri Petrochemical Tbk
Location: Duri - Riau Location: Sorong - Papua Location: Cilegon – Banten, West Java
Project Duration: Jun’24 – Sep ‘27 Project Duration: Jan ’25 – Dec ‘25 Project Duration: Apr ’25 – Jun ’26
This project focuses on providing Long Range This project delivers drilling and WOWS operation This project focuses on providing Risk Based
Ultrasonic Testing (LRUT) services to assess pipeline services to support safe and efficient activities in Inspection (RBI) services to evaluate asset integrity,
condition and integrity. The scope includes advanced Sorong, Papua. The services ensure operational optimize maintenance planning, and ensure
inspection to detect anomalies, enhance safety, and reliability, compliance with industry standards, and compliance with safety and industry standards in
ensure compliance with industry standards. improved performance. petrochemical operations.
Page 15
Project Highlights: Sustainability Project
Environmental Monitoring Services at 850 kWp Solar Rooftop Powerplant Road Access, Bridge, and Wellpad
PT Pertamina EP Regional 2 Zone 7 in Ngawi Construction Services in Gunung
Subang Field Hamiding
Client: PERTAMINA EP ZONA 7 FIELD SUBANG Client: SAKTI SAHWAHITA INDONESIA, PT. Client: Star Energy
Location: Subang, Cirebon, West Java Location: Ngawi, East Java Location: Gunung Hamiding, North Maluku
Project Duration: June 2022 – Apr 2026 Project Duration: Sep ’25 – Jan ‘26 Project Duration: Sep ’25 – Jan ‘26
This project focuses on conducting environmental This project focuses on the development and This project involves the construction of road access,
monitoring activities to assess air, water, and soil installation of solar rooftop system to support clean bridges, wellpads, and supporting facilities in
quality in the operational area. The services aim to energy utilization and sustainable operations. The Gunung Hamiding. The work is aimed at ensuring
ensure regulatory compliance, support sustainable service include design, construction commissioning safe mobility, reliable infrastructure, and operational
operations, and maintain environmental standards. to ensure efficiency, reliability, and compliance with continuity in line with industry standards
renewable energy standards.
Page 16
PUBLIC EXPOSE 2025 Financial Performance
Page 17
Financial Performance Q2 2025
Demonstrates Strong Revenue Growth Despite Challenges That Impacted Profit Margins
Revenue Gross Profit (GP) Net Income (NI)
-9.0% +3.9% +21.6%
INCOME 1.039 101 8,0
945 97 6,6
STATEMENT
(IDR bn)
Q2 2024 Q2 2025 Q2 2024 Q2 2025 Q2 2024 Q2 2025
9.3% % GP Margin 10.7% 0.6% % NI Margin 0.8%
Offshore
Others
2%
Offshore
Others HIGHLIGHTS
15% 15%
2%
❑ Revenue in Q2 2025 reached 945, representing a 9.0% decline compared to
1,039 in Q2 2024. The decrease was mainly driven by lower contribution
from the Manpower Supply (MPS) business. The Company has shifted its
REVENUE AIS
Q2 Q2 focus toward strengthening the OMES segment, which, despite generating
11%
CONTRIBUTION 2024 2025
lower top-line revenue, delivers healthier margins.
(IDR bn) ❑ As result focusing on OMES segment which provide better margin, gross
profit and net income for Q2 2025 has improved
OMES
OMES AIS Notes:
64%
72% 19% AIS : Asset Integrity Service
OMES : Operation Maintenance & Engineering Services
Page 18
Balance Sheet & Cashflow Q2 2025
Demonstrates Consistent Growth In Assets, Liabilities, And Equity, Reflecting The Company's Stable Financial Performance
Total Asset Total Liabilities
+1.2% Total Equity
+1.0%
+1.5%
1.401 1.418
846 855
BALANCE 555 563
SHEET
(IDR bn)
Q2 2024 Q2 2025 Q2 2024 Q2 2025 Q2 2024 Q2 2025
Operating Cashflow Ending Cashflow HIGHLIGHTS
+21.3K% -0.7%
❑ The balance sheet shows steady growth, with total
assets up 1.2% from Q2 2024, supported by a 1.0% rise
48.088 in liabilities and 1.5% growth in equity, reflecting
CASHFLOW 109.433 108.636
continued expansion and financial stability.
(IDR Mn) ❑ Cash flow shows strong improvement in operating
cash flow, up 21.3K% from Q2 2024, while ending
cash flow slipped 0.7%, reflecting effective utilization
224
with liquidity remaining healthy.
Q2 2024 Q2 2025 Q2 2024 Q2 2025
Page 19
Financial Ratio Q2 2025
Reflects The Company’s Resilience Through Stable Financial Ratios, Sustained Partner Confidence, and Covenant Compliance
Current Ratio Debt to Equity Ratio Debt to Service Ratio
+1.8% -0.4% -0.8%
FINANCIAL 1,46 1,49
1,52 1,52
2,45 2,43
RATIO
Q2 2024 Q2 2025 Q2 2024 Q2 2025 Q2 2024 Q2 2025
FINANCIAL INSTITUTION PARTNER HIGHLIGHTS
❑ In 2025, Radiant Group reinforced its strategic banking partnerships
through two significant credit facilities. On June 2, 2025, the Group
signed a Credit Agreement with CIMB Niaga to provide financing
support across all subsidiaries. Furthermore, on August 20, 2025, PT
Supraco Indonesia secured a IDR 115 billion working capital facility with
UOB Indonesia, dedicated to supporting strategic projects with Sarulla
Operations Limited and PT Star Energy Geothermal Indonesia.
❑ The Company recorded stronger liquidity, reflecting greater financial
flexibility. The capital structure remained stable with consistent
leverage levels, while debt service capacity stayed strong despite a
slight decline. Overall, these results demonstrate resilience and a
commitment to financial discipline.
Page 20
PUBLIC EXPOSE 2025 Sustainable Performance
Page 21
SUSTAINABILITY ROADMAP
MASTERY & PERFORMING EXCELLENCE INSPIRE & SUSTAINING
(2024 -2026) (2027 – 2030) 2031 - 2036
▪ Reduce absolute carbon ▪ Reduce absolute carbon emission by 50% ▪ Significantly reduce emissions
emissions by 15% ▪ Integrate sustainable practices from corporate activity (Net Zero)
▪ Enhancing collective ▪ Transparent & accountable corporate ▪ Maximizing social impacts
understanding governance ▪ Implementing the best practices
▪ Planning and consolidate ▪ Improve the well-being employees for ensuring adherence to our
collective actions ▪ Social community empowerment Code of Conduct
SUSTAINABILITY PILLARS
GREEN OPERATION INCLUSIVE AND FAIR AND SAFE STAND WITH GOVERNANCE
PRACTICE SUSTAINABLE BUSINESS WORKPLACE COMMUNITIES PRACTICES
▪ Energy efficiency & • Green and transition • Diversity, equity & • Local workforce priority • Good corporate
renewable transition product & service inclusion culture • Respect for culture & governance (PUGKI,
▪ Circular economy, waste, innovation • Sustainability training values ACGS, and others)
wastewater, and water • Stakeholder • Fair wages, no • Impactful CSER • Anti-bribery &
management collaboration & ISO 9001 child/forced labor programs whistleblowing system
▪ ISO 14001, GHG Inventory • Sustainable investment • ISO 45001 & employee • Transparent
& Carbon Neutral focus well-being sustainability reporting
Page 22
ESG PERFORMANCE
ENVIRONMENTAL SOCIAL GOVERNANCE
1) Women Empowerment: 40% of
1) PT Supraco Lines used 95.633 GJ of B30
employees are women (2024), 17% of 1) Adopted GRI Standards (2021) and Task
fuel (Fuel Efficiency - 100% of fuel
Vice President are women Force on Climate-related Financial
consumption)
Disclosures/TCFD integration (2024)
2) CSR Expenses: Increased to IDR 3.31
2) Achieved an EDGE Silver green
billion (2024) 2) Score 74.46 GCG (2024) under Asean
building certification (2024)
CG Scorecard
3) Training Hours: 10.188 hours (2024)
3) Adopted AirVisual Outdoor system for
air quality monitoring 3) Maintained ISO 9001 since 2002
4) Safety Metrics:
- 19 Years of MOPU Operation without 4) Implemented ISO 37001 – Anti Bribery
4) Developed 3 geothermal plants
LTI System since 2022
totaling 20 MW, avoiding about 167,885
- Compliant with SMK3 & ISO 45001
tonnes of CO₂e
5) Began electrifying operational vehicles
with an EV charging station at its HQ.
Page 23
SUSTAINABILITY EVENT
TRAINING TREE PLANTING INITIATIVES (CSER)
Through our tree planting initiatives
07 Feb 2025 : Radiant Group organized an online 20 Feb 2025: Planted 10 Malapari seedlings around the Radiant has:
training on Mangrove and Malapari collaboration branch office in Duri, Riau.
• Planted 5,673 seedlings (Mangrove & Malapari with
with Ikamat and Batara.
strong community and government involvement.
• Estimated carbon sequestration: ~85,868 kg
CO₂e/year (≈ 85.9 tons), based on conservative
CIFOR methodology and 80% survival rate.
Feb – May 2025: Planted 5000 mangrove + 8 malapari
seedling in Sumenep, Madura.
10 – 13 Feb 2025: Conducted an ecological assesment
and pilot planting program in Sumenep, Madura. Show
our commitment to Nature Based Solution (NBS),
contributing to carbon sequestration, biodiversity
protection, and community empowerment in coastal
ecosystems
June 2025: Planted 630 malapari seedlings across 3 sites
(Wulen Lo Beach, Lamatokan Village, Bao Lali Duli Village)
in Lembata, NTT.
Appreciation Letter from the Appreciation Letter from the
Lembata Environmental Agency Sumenep Environmental Agency
Page 24
Thank You
Names mentioned 26 people and organisations named in the text · linked when the evidence is strong
unresolved
org
PT Pertamina Hulu Indonesia
p.8 ×2
unresolved
org
PT Pertamina Hulu Energi OSES
p.8
unresolved
org
RH Petro Gas Limited
p.8
unresolved
org
PT Pertamina Hulu Rokan Best Vendor
p.8
unresolved
org
PT PLN Mandau Cipta Tenaga Nusantara
p.8
unresolved
org
PT Elnusa Trans Samudra
p.8
unresolved
org
PT Pertamina EP Cepu
p.8
unresolved
org
PT Supraco Daya Wisesa
p.9
unresolved
org
PT Daemeter Consulting
p.9
unresolved
org
PT Supraco
p.9
unresolved
org
PT Lembata Hira
p.9
unresolved
org
Chandra Asri Petrochemical Tbk
p.14 ×2
unresolved
org
PT Pertamina EP Regional
p.15
unresolved
org
PT Supraco Indonesia
p.19
unresolved
org
Sarulla Operations Limited
p.19
unresolved
org
PT Star Energy Geothermal Indonesia.
p.19
unresolved
org
PT Supraco Lines
p.22
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
No extraction attempted yet.