Back to announcement
20260722_ELSA_Laporan Informasi dan Fakta Material_32114031_lamp2.pdf
Other Text extracted ELSASource file signed link, expires in 15 minutes
Extracted text 1
Page 1
Narahubung:
Jayanty Oktavia Maulina (Anty)
Manager of Corporate Communications
Graha Elnusa 16th Floor, Jl. TB Simatupang Kav. 1B, Jakarta 12560
Tel: (021) 7883 0850 | Fax: (021) 7883 0907 | Mob: +62813 1787 1717
E-mail: jayanty.maulina@elnusa.co.id
Press Release
Elnusa Strengthens Strategic Role through Dual Completion with PHR Zona 4 to
Support Pertamina's Production Targets
Jakarta, 22 July 2026 - PT Elnusa Tbk (Elnusa), an integrated energy services company and part of Pertamina's Upstream Subholding, continues to
strengthen its role as a strategic partner of Pertamina Hulu Rokan (PHR) Zona 4 through the implementation of Dual Completion technology at Adera
Field. This collaboration forms part of Pertamina's broader initiative to increase national oil and gas production while reinforcing Indonesia's energy
security.
The Dual Completion implementation supported by Elnusa is part of PHR Zona 4's field development strategy to optimize the potential of mature oil and
gas fields. The technology complements various development initiatives, including development drilling, step-out drilling, and reservoir optimization, to
improve the efficiency of hydrocarbon recovery.
In supporting the implementation, Elnusa leveraged its capabilities in Well Intervention & Completion, Engineering Services, and field operation execution
while maintaining the highest Health, Safety, Security, and Environment (HSSE) standards. These capabilities enabled completion activities to be carried
out safely, on schedule, and in accordance with operational standards, contributing to the optimization of production at PHR Zona 4 while creating added
value for Pertamina's upstream field development.
PT Elnusa Tbk's Operations Director, Andri Haribowo, stated that the collaboration with PHR Zona 4 reflects Elnusa's commitment to continuously
delivering operational solutions that create value for Indonesia's upstream oil and gas industry, "The successful implementation of Dual Completion with
PHR Zona 4 demonstrates that strong collaboration between operators and energy service companies can deliver more productive and efficient
operations. Elnusa's capabilities have become an integral part of Pertamina's efforts to optimize field development through strategic partnerships. This
collaboration reflects how national expertise can contribute meaningful value to the sustainability of Indonesia's upstream oil and gas operations," said
Andri.
Through the implementation of Dual Completion at the BNG-D14 well in Adera Field, two productive reservoirs can be produced simultaneously through
a single wellbore without requiring separate wells for each reservoir interval. This approach improves field development efficiency, reduces the need for
additional well interventions, and maximizes the utilization of productive reservoirs, making it an effective solution for mature oil and gas fields.
The application of Dual Completion under PHR Zona 4's field development program has delivered an additional production of approximately 480 barrels
of oil per day (BOPD) and 3.3 million standard cubic feet of gas per day (MMSCFD), exceeding the initial target of 186 BOPD and 1.09 MMSCFD. This
technology has become one of the key approaches for optimizing mature fields through more efficient reservoir utilization. Following this successful
implementation, the technology is planned to be deployed in additional wells, including GNK-PD80 and BNG-B7.
According to Andri, the achievement highlights the importance of close collaboration between operators and energy service providers in creating safer,
more effective, and sustainable operations, "We believe that increasing oil and gas production is driven not only by technology, but also by strong
collaboration among entities within the Pertamina Group. Backed by our experience and technical capabilities, Elnusa remains committed to supporting
PHR and other Pertamina Group entities through reliable, innovative, and operational excellence-driven services to help achieve national oil and gas
production targets while strengthening Indonesia's energy security," Andri concluded.
Moving forward, Elnusa will continue strengthening its synergy with Pertamina Group by delivering integrated energy services that support higher field
productivity, accelerate technology implementation, and promote operational excellence. This commitment reaffirms Elnusa's role as Pertamina's
strategic partner in developing more efficient, sustainable, and competitive upstream operations while contributing to Indonesia's long-term energy
security.
About Elnusa (IDX: ELSA)
PT Elnusa Tbk (Elnusa) is a subsidiary of PT Pertamina Hulu Energi (PHE) which is part of the Pertamina Upstream Subholding, which operates in the field
of integrated energy services to provide total solutions. Elnusa has DNA of Resilience and innovation for more than 54 years in the energy industry, has
core competencies in upstream oil and gas services, energy distribution and logistics services and supporting services. The upstream oil and gas service line
includes Geoscience & Reservoir services (land, transition zone & marine and data processing), drilling & oil and gas field maintenance services (drilling &
workover), engineering, procurement, construction & operation maintenance (EPC-OM) services. The energy distribution and logistics service line includes
fuel transportation services, depot management and chemical sales. The supporting service line includes marine support services, fabrication, and data
management. Elnusa continues to be committed to implementing Corporate Governance in accordance with GCG and ESG principles to create a company
that is highly competitive, continues to grow and provides sustainable benefits for all stakeholders. Further information can be accessed at
www.elnusa.co.id
Names mentioned 3 people and organisations named in the text · linked when the evidence is strong
unresolved
org
PT Elnusa Tbk's Operations
p.1
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
No extraction attempted yet.