Skip to content
Back to announcement

LK-PLN Juni 2025.pdf

Financial statement Text extracted PPLN

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 198

Page 1
PERUSAHAAN PERSEROAN (PERSERO)
PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

LAPORAN KEUANGAN KONSOLIDASIAN INTERIM/
INTERIM CONSOLIDATED FINANCIAL STATEMENTS


30 JUNI 2025 DAN 31 DESEMBER 2024/
JUNE 30, 2025 AND DECEMBER 31, 2024
Page 2
25 Juli   July 25
Page 3
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                       Lampiran 1/1 Schedule

LAPORAN POSISI KEUANGAN                                                            INTERIM CONSOLIDATED STATEMENTS OF
KONSOLIDASIAN INTERIM PADA TANGGAL                                                                             FINANCIAL POSITION
30 JUNI 2025 DAN 31 DESEMBER 2024                                               AS AT JUNE 30, 2025 AND DECEMBER 31, 2024
(Disajikan dalam jutaan Rupiah, kecuali dinyatakan lain)                        (Expressed in millions of Rupiah, unless otherwise stated)


                                                              30 Juni/            31 Desember/
                                           Catatan/           June 30,            December 31,
                                            Notes               2025                  2024
ASET                                                                                                                                         ASSETS
ASET TIDAK LANCAR                                                                                                   NON-CURRENT ASSETS
Aset tetap                                     6             1,511,644,672          1,511,901,240                Property, plant and equipment
Aset hak-guna                                  7                27,754,519             29,368,236                           Right-of-use assets
Properti investasi                             8                 5,567,178              5,567,178                        Investment properties
Investasi pada entitas asosiasi                                                                                      Investments in associates
  dan ventura bersama                          9                31,658,836              30,284,844                            and joint ventures
Aset pajak tangguhan                          47                   501,180                 609,374                          Deferred tax assets
Piutang pihak berelasi                        10                 1,130,334               1,097,914             Receivables from related parties
Rekening bank
  dibatasi penggunaannya                      11                 3,435,497               3,289,705                    Restricted cash in banks
Piutang lain-lain                             17                 1,633,506               1,500,345                           Other receivables
Pajak dibayar di muka                         19                 9,802,896              12,340,937             Prepaid expenses and advances
Biaya dibayar di muka dan uang muka           20                   215,119                 246,471             Prepaid expenses and advances
Aset derivatif                                56                         -                 604,572                           Derivative assets
Aset tidak lancar lain                        12                 8,891,165               8,118,061                    Other non-current assets
Jumlah Aset Tidak Lancar                                     1,602,234,900          1,604,928,877                     Total Non-current Assets

ASET LANCAR                                                                                                               CURRENT ASSETS
Kas dan setara kas                            13                46,615,010              61,364,446                   Cash and cash equivalents
Rekening bank
  dibatasi penggunaannya                      11                   231,818                 232,510                    Restricted cash in banks
Investasi jangka pendek                       14                 1,257,233                 984,587                      Short-term investments
Piutang usaha                                                                                                                Trade receivables
  Pihak berelasi                              15                 2,916,833               2,569,123                            Related parties
  Pihak ketiga                                15                25,349,881              25,077,279                               Third parties
Piutang dari pemerintah                       16                78,448,850              43,290,748               Receivables from Government
Piutang lain-lain                             17                 3,669,388               3,417,791                           Other receivables
Persediaan                                    18                23,695,422              20,139,800                                   Inventories
Pajak dibayar di muka                         19                 7,588,084               5,403,503                                Prepaid taxes
Biaya dibayar di muka dan uang muka           20                 3,535,274               4,269,422             Prepaid expenses and advances
Piutang pihak berelasi                        10                     7,948                 178,202             Receivables from related parties
Aset derivatif                                56                 1,088,898                 518,978                            Derivative assets

Jumlah Aset Lancar                                             194,404,639            167,446,389                          Total Current Assets

JUMLAH ASET                                                  1,796,639,539          1,772,375,266                               TOTAL ASSETS




        Catatan atas laporan keuangan konsolidasian merupakan bagian     The accompanying notes to the consolidated financial statements
          yang tidak terpisahkan dari laporan keuangan konsolidasian      form an integral part of these consolidated financial statements
Page 4
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                       Lampiran 1/2 Schedule

LAPORAN POSISI KEUANGAN                                                             INTERIM CONSOLIDATED STATEMENTS OF
KONSOLIDASIAN INTERIM PADA TANGGAL                                                                              FINANCIAL POSITION
30 JUNI 2025 DAN 31 DESEMBER 2024                                                AS AT JUNE 30, 2025 AND DECEMBER 31, 2024
(Disajikan dalam jutaan Rupiah, kecuali dinyatakan lain)                         (Expressed in millions of Rupiah, unless otherwise stated)

                                                              30 Juni/             31 Desember/
                                           Catatan/           June 30,             December 31,
                                            Notes               2025                   2024


LIABILITAS DAN EKUITAS                                                                                                LIABILITIES AND EQUITY
EKUITAS                                                                                                                               EQUITY
Ekuitas yang dapat diatribusikan                                                                                Equity attributable to owners
  kepada pemilik entitas induk                                                                                                 of the parent
Modal saham - nilai nominal Rp1 per saham                                                          Capital stock - par value of Rp1 per share
  Modal dasar - 439.000.000 saham                                                                        Authorized - 439,000,000 shares
  Modal ditempatkan dan disetor penuh                                                                               Subscribed and paid-up
    150.536.096 saham                                                                                                  150,536,096 shares,
    pada 30 Juni 2025 dan                                                                                          as at June 30, 2025 and
    150.536.096 saham pada                                                                                       150,536,096 shares, as at
    31 Desember 2024                          21               150,536,096             150,536,096                     December 31, 2024.
Tambahan modal disetor                        22                    34,608                  34,608                   Additional paid-in capital
Selisih transaksi dengan pihak                                                                         Difference in value from transactions
  non-pengendali                                                       (2,100)               (2,100)          with non-controlling interests
Saldo laba                                                                                                                  Retained earnings
  Ditentukan penggunaannya                    21               110,092,332              95,738,657                             Appropriated
  Tidak ditentukan penggunaannya              21                92,698,881             103,765,084                          Unappropriated
Penghasilan komprehensif lain                                  707,828,088             709,892,501             Other comprehensive income
Ekuitas yang dapat diatribusikan                                                                                Equity attributable to owners
  kepada pemilik entitas induk                                1,061,187,905           1,059,964,846                            of the parent
Kepentingan non-pengendali                                       1,193,651               1,195,389                   Non-controlling interests

Jumlah Ekuitas                                               1,062,381,556           1,061,160,235                                    Total Equity

LIABILITAS JANGKA PANJANG                                                                                          NON-CURRENT LIABILITIES
Liabilitas pajak tangguhan                    47                72,582,949               70,002,171                     Deferred tax liabilities
Pendapatan ditangguhkan                       23                37,935,073               34,449,127                         Deferred revenue
Utang jangka panjang -
  setelah dikurangi bagian
  jatuh tempo                                                                                                               Long-term liabilities -
  dalam satu tahun                                                                                                        net of current portion
  Penerusan pinjaman                          24                22,654,862               23,023,177                             Two-step loans
  Utang kepada Pemerintah                                                                                                      Government and
    dan lembaga keuangan                                                                                              non-bank Government
    Pemerintah non-bank                       25                 1,709,947               2,092,807                 financial institution loans
  Utang sewa                                  26                 9,893,924              10,015,345                              Lease liabilities
  Utang bank                                  27               127,120,815             135,444,400                                   Bank loans
  Utang obligasi dan sukuk ijarah             28               190,137,223             188,527,108              Bonds payable and sukuk ijara
  Utang listrik swasta                        29                 4,421,405               4,723,016                Electricity purchase payable
  Liabilitas imbalan kerja                    49                72,140,027              70,452,141                Employee benefits liabilities
  Utang lain-lain                             31                   542,592                 433,655                              Other payables

Jumlah Liabilitas Jangka Panjang                               539,138,817             539,162,947                 Total Non-current Liabilities




        Catatan atas laporan keuangan konsolidasian merupakan bagian      The accompanying notes to the consolidated financial statements
          yang tidak terpisahkan dari laporan keuangan konsolidasian       form an integral part of these consolidated financial statements
Page 5
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                       Lampiran 1/3 Schedule

LAPORAN POSISI KEUANGAN                                                           INTERIM CONSOLIDATED STATEMENTS OF
KONSOLIDASIAN INTERIM PADA TANGGAL                                                                            FINANCIAL POSITION
30 JUNI 2025 DAN 31 DESEMBER 2024                                              AS AT JUNE 30, 2025 AND DECEMBER 31, 2024
(Disajikan dalam jutaan Rupiah, kecuali dinyatakan lain)                       (Expressed in millions of Rupiah, unless otherwise stated)


                                                               30 Juni/           31 Desember/
                                            Catatan/           June 30,           December 31,
                                             Notes               2025                 2024

 LIABILITAS JANGKA PENDEK                                                                                              CURRENT LIABILITIES
 Utang usaha                                                                                                                     Trade payables
   Pihak berelasi                               30               33,921,304            22,712,501                              Related parties
   Pihak ketiga                                 30               51,233,976            47,985,318                                 Third parties
 Utang pajak                                    32                7,012,825             5,301,877                                 Taxes payable
 Biaya masih harus dibayar                      33                9,774,459            10,495,898                             Accrued expenses
 Uang jaminan langganan                         34               19,217,448            18,463,585                Customers' security deposits
 Utang biaya proyek                             35                1,591,433             1,680,636                          Project cost payable
 Pendapatan ditangguhkan                        23                4,084,203             3,849,635                              Deferred revenue
 Liabilitas derivatif                           56                1,834,515                61,781                           Derivative liabilities
 Utang jangka panjang jatuh tempo                                                                                          Current maturities of
   dalam satu tahun                                                                                                       long-term liabilities
   Penerusan pinjaman                           24                 3,139,546             3,013,763                             Two-step loans
   Utang kepada Pemerintah                                                                                       Government and non-bank
     dan lembaga keuangan                                                                                           Government financial
     Pemerintah non-bank                        25                4,101,352               750,000                           institution loans
   Utang sewa                                   26                2,497,089             2,880,568                              Lease liabilities
   Utang bank                                   27               23,798,835            21,785,261                                   Bank loans
   Utang obligasi dan sukuk ijarah              28               11,373,850            10,532,135             Bonds payable and sukuk ijara
   Utang listrik swasta                         29                  636,939               615,418               Electricity purchase payable
   Liabilitas imbalan kerja                     49                9,556,166            10,998,635               Employee benefits liabilities
   Utang lain-lain                              31               11,345,225            10,925,073                              Other payables
 Jumlah Liabilitas Jangka Pendek                                195,119,166           172,052,084                      Total Current Liabilities

 JUMLAH LIABILITAS                                              734,257,983           711,215,031                           TOTAL LIABILITIES

 JUMLAH EKUITAS DAN LIABILITAS                                1,796,639,539         1,772,375,266          TOTAL EQUITY AND LIABILITIES




        Catatan atas laporan keuangan konsolidasian merupakan bagian   The accompanying notes to the consolidated financial statements
          yang tidak terpisahkan dari laporan keuangan konsolidasian    form an integral part of these consolidated financial statements
Page 6
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                        Lampiran 2/1 Schedule

LAPORAN LABA RUGI DAN PENGHASILAN                                                       INTERIM CONSOLIDATED STATEMENTS
KOMPREHENSIF LAIN KONSOLIDASIAN INTERIM                                                                    OF PROFIT OR LOSS AND
UNTUK PERIODE ENAM BULAN                                                                       OTHER COMPREHENSIVE INCOME
YANG BERAKHIR PADA TANGGAL                                                                FOR THE SIX MONTH PERIODS ENDED
30 JUNI 2025 DAN 2024                                                                                        JUNE 30, 2025 AND 2024
(Disajikan dalam jutaan Rupiah, kecuali dinyatakan lain)                         (Expressed in millions of Rupiah, unless otherwise stated)


                                                              30 Juni/              30 Juni/
                                           Catatan/           June 30,              June 30,
                                            Notes               2025                   2024
 PENDAPATAN USAHA                                                                                                                   REVENUES
 Penjualan tenaga listrik                     36               179,578,770           171,801,960                              Sale of electricity
 Penyambungan pelanggan                       23                 1,056,109               812,831                      Customer connection fees
 Subsidi listrik Pemerintah                   37                40,091,369            37,266,626                 Government's electricity subsidy
 Pendapatan kompensasi                        16                55,113,607            46,493,492                         Compensation income
 Lain-lain                                    38                 6,052,581             5,688,317                                           Others
 Jumlah Pendapatan Usaha                                       281,892,436           262,063,226                                   Total Revenues
 BEBAN USAHA                                                                                                      OPERATING EXPENSES
 Bahan bakar dan pelumas                      39                94,959,770            86,442,970                         Fuel and lubricants
 Pembelian tenaga listrik                     40                91,074,096            87,258,578                       Purchased electricity
 Sewa                                         41                 1,446,497             1,141,018                                      Lease
 Pemeliharaan                                 42                13,987,219            13,037,129                               Maintenance
 Kepegawaian                                  43                18,370,699            16,681,739                                  Personnel
 Penyusutan aset tetap                         6                25,010,289            22,493,076 Property, plant and equipment depreciation
 Penyusutan aset hak-guna                      7                 1,743,237             1,664,980            Right-of-use assets depreciation
 Administrasi                                 44                 4,735,285             4,836,973                                     Others

 Jumlah Beban Usaha                                            251,327,092           233,556,463                        Total Operating Expenses

 LABA USAHA                                                     30,565,344            28,506,763                            OPERATING PROFIT

 Penghasilan lain-lain - bersih               46                   889,172              2,649,518                               Other income - net
 Kerugian kurs                                                                                                                     Loss on foreign
  mata uang asing - bersih                                      (8,720,390)           (12,109,517)                               exchange - net
 Penghasilan keuangan                                              402,630                652,286                                Financial income
 Beban keuangan                               45               (11,384,481)
                                                                         -            (10,464,162)                                  Financial cost

 LABA SEBELUM PAJAK                                             11,752,274              9,234,888                         PROFIT BEFORE TAX

 BEBAN PAJAK                                  47                (5,115,188)            (4,233,335)                                TAX EXPENSES

 LABA PERIODE BERJALAN                                           6,637,086              5,001,553                    PROFIT FOR THE PERIOD




         Catatan atas laporan keuangan konsolidasian merupakan bagian    The accompanying notes to the consolidated financial statements
           yang tidak terpisahkan dari laporan keuangan konsolidasian     form an integral part of these consolidated financial statements
Page 7
                     PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                  DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                           Lampiran 2/2 Schedule

LAPORAN LABA RUGI DAN PENGHASILAN                                                          INTERIM CONSOLIDATED STATEMENTS
KOMPREHENSIF LAIN KONSOLIDASIAN INTERIM                                                                       OF PROFIT OR LOSS AND
UNTUK PERIODE ENAM BULAN                                                                          OTHER COMPREHENSIVE INCOME
YANG BERAKHIR PADA TANGGAL                                                                   FOR THE SIX MONTH PERIODS ENDED
30 JUNI 2025 DAN 2024                                                                                           JUNE 30, 2025 AND 2024
(Disajikan dalam jutaan Rupiah, kecuali dinyatakan lain)                            (Expressed in millions of Rupiah, unless otherwise stated)

                                                                30 Juni/               30 Juni/
                                                Catatan/        June 30,               June 30,
                                                 Notes            2025                   2024
LABA PERIODE BERJALAN                                              6,637,086              5,001,553                       PROFIT FOR THE PERIOD
Penghasilan komprehensif lain                                                                                         Other comprehensive income
 tahun berjalan                                                                                                                          for the year
Pos-pos yang akan direklasifikasi                                                                                      Items that may be reclassified
 ke laba rugi:                                                                                                        subsequently to profit or loss:
 Bagian penghasilan komprehensif lain dari                                                                   Share of other comprehensive income
   entitas asosiasi dan ventura bersama            9                (353,278)               857,772            from associates and joint venture
 Lindung nilai arus kas                                           (1,576,557)               146,057                               Cash flow hedging
Pos-pos yang tidak akan direklasifikasi                                                                             Items that will not be reclassified
 ke laba rugi:                                                                                                                       to profit or loss:
 Perubahan surplus revaluasi                                                                              Changes in property, plant and equipment
   aset tetap                                      6                (576,082)                      -                           revaluation surplus
 Pengukuran kembali                                                                                                                 Remeasurement
   atas program imbalan pasti                      49                566,031             (5,275,369)                      on defined benefit plans
Manfaat (Beban) pajak terkait                      47               (124,527)             1,160,581                       Related income tax benefits
Penghasilan komprehensif lain                                                                                         Other comprehensive income
 tahun berjalan setelah pajak                                     (2,064,413)            (3,110,959)                         for the year after tax
JUMLAH PENGHASILAN KOMPREHENSIF                                                                                 TOTAL COMPREHENSIVE INCOME
  PERIODE BERJALAN                                                 4,572,673              1,890,594                        FOR THE PERIOD

Laba (rugi) periode berjalan                                                                                              Income (loss) for the period
  diatribusikan kepada:                                                                                                             attributable to:
  kepada Pemilik entitas induk                                     6,638,824              4,992,188                           Owners of the parent
  Kepentingan non-pengendali                                          (1,738)
                                                                           -                  9,365                         Non-controlling interest
 Jumlah                                                            6,637,086-             5,001,553                                             Total

Jumlah penghasilan komprehensif periode                                                                                  Total comprehensive income
  berjalan diatribusikan kepada:                                                                                       for the period attributable to:
  Pemilik entitas induk                                            4,574,411              1,881,229                            Owners of the parent
  Kepentingan non-pengendali                                          (1,738)                 9,365                          Non-controlling interest

 Jumlah                                                            4,572,673              1,890,594                                             Total

LABA PER SAHAM DASAR
 (Dalam Rupiah penuh)                              48                    44,101              33,970                  BASIC EARNINGS PER SHARE




          Catatan atas laporan keuangan konsolidasian merupakan bagian      The accompanying notes to the consolidated financial statements
            yang tidak terpisahkan dari laporan keuangan konsolidasian       form an integral part of these consolidated financial statements
Page 8
                                                                                                                PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                                                                                                             DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                                                                                                                          Lampiran 3 Schedule

LAPORAN PERUBAHAN EKUITAS KONSOLIDASIAN INTERIM                                                                                                                                                                                INTERIM CONSOLIDATED STATEMENTS OF CHANGES IN EQUITY
UNTUK PERIODE ENAM BULAN YANG BERAKHIR PADA TANGGAL                                                                                                                                                                                                     FOR THE SIX MONTH PERIODS ENDED
30 JUNI 2025 DAN 2024                                                                                                                                                                                                                                                   JUNE 30, 2025 AND 2024
(Disajikan dalam jutaan Rupiah, kecuali dinyatakan lain)                                                                                                                                                                                 (Expressed in millions of Rupiah, unless otherwise stated)

                                                                                                         Diatribusikan kepada pemilik entitas induk/Attributable to owners of the parent entity
                                                                                                                                                                                     Penghasilan komprehensif lain/
                                                                                                                                                                                     Other comprehensive income
                                                                                                                                                                                                      Bagian
                                                                  Penyertaan                                                                                                                       penghasilan
                                                                 modal Negara                                                                                                                    komprehensif
                                                                 dalam proses                                                                       Surplus                                          lain dari                         Selisih transaksi            Ekuitas
                                                 Modal             penerbitan                                                                      revaluasi                                    entitas asosiasi                        dengan pihak             yang dapat
                                             ditempatkan             saham/                                                                           aset                Pengukuran               dan ventura                         non-pengendali/          diatribusikan
                                             dan disetor              Stock       Tambahan                                                           tetap/                 kembali                 bersama/                            Difference in          kepada pemilik
                                                penuh/           subscription       modal                         Saldo laba/                      Property,             atas program            Share of other                          value from             entitas induk/
                                             Subscribed               from         disetor/                   Retained earnings                    plant and            imbalan pasti/          comprehensive       Lindung nilai       transactions                Equity            Kepentingan
                                             and paid-up         Government       Additional          Ditentukan         Tidak ditentukan         equipment            Remeasurement              income from         arus kas/               with               attributable        non-pengendali/
                                                capital           in issuance      paid-in          penggunaannya/       penggunaannya/           revaluation             on defined            associates and       Cash flow         non-controlling           to owner of         Non-controlling    Jumlah ekuitas/
                                                 stock              process        capital           Appropriated        Unappropriated             surplus              benefit plans           joint ventures        hegdes              interests              the parent            interests        Total equity


Saldo per 1 Januari 2024                       150,536,096                -            34,608            76,803,066            107,538,313           688,394,826              (12,464,458)           3,790,009            (136,353)               (2,100)        1,014,494,007             1,137,392        1,015,631,399                          Balance as of January 1, 2024

                                                                                                                                                                                                                                                                                                                                                    Reclassification from additional
Cadangan umum tahun berjalan                                                                             18,935,591            (18,935,591)                                                                                                                                      -                                          -                                      paid-in capital
Dividen                                                                                                                         (3,090,004)                                                                                                                          (3,090,004)                               (3,090,004)                                               Dividends
Reklasifikasi surplus revaluasi aset tetap                                                                                                                                                                                                                                       -                                          -   Reclassification of property, plant, and revaluation
  ke saldo laba                                                                                                                    547,339               (547,339)                                                                                                               -                                          -                        surplus to retained earnings
Jumlah penghasilan komprehensif                                                                                                                                                                                                                                              -                                          -                             Total comprehensive income
  periode berjalan                                           -                -                 -                     -         17,705,027            39,973,431               (9,938,567)             873,889              (52,937)                       -        48,560,843                57,997           48,618,840                                         for the period

Saldo per 31 Desember 2024                     150,536,096                    -        34,608            95,738,657            103,765,084           727,820,918              (22,403,025)           4,663,898            (189,290)               (2,100)        1,059,964,846             1,195,389        1,061,160,235                      Balance as of December 31, 2024




Saldo per 1 Januari 2025                       150,536,096                    -        34,608            95,738,657            103,765,084           727,820,918              (22,403,025)           4,663,898            (189,290)               (2,100)        1,059,964,846             1,195,389         1,061,160,235                         Balance as of January 1, 2025



Cadangan umum tahun berjalan                                                  -                          14,353,675            (14,353,675)                                                                                                                                      -                                          -                         Appropriation during the year
Dividen                                                                                                                         (3,351,352)                                                                                                                          (3,351,352)                               (3,351,352)                                               Dividends
Jumlah penghasilan komprehensif                                                                                                                                                                                                                                                                                             -                         Total comprehensive income
  periode berjalan                                           -                -                 -                     -          6,638,824               (576,082)               441,504              (353,278)          (1,576,557)                       -         4,574,411                (1,738)            4,572,673                                          for the period

Saldo per 30 Juni 2025                         150,536,096                    -        34,608           110,092,332             92,698,881           727,244,836              (21,961,521)           4,310,620           (1,765,847)              (2,100)        1,061,187,905             1,193,651        1,062,381,556                            Balance as of June 30, 2025




                                                      Catatan atas laporan keuangan konsolidasian merupakan bagian                                                                                 The accompanying notes to the consolidated financial statements
                                                          yang tidak terpisahkan dari laporan keuangan konsolidasian                                                                                form an integral part of these consolidated financial statements
Page 9
                      PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                   DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                        Lampiran 4/1 Schedule

LAPORAN ARUS KAS KONSOLIDASIAN INTERIM                                             INTERIM CONSOLIDATED STATEMENTS OF
UNTUK PERIODE ENAM BULAN                                                                     CASH FLOWS FOR THE SIX MONTH
YANG BERAKHIR PADA TANGGAL                                                                                           PERIODS ENDED
30 JUNI 2025 DAN 2024                                                                                       JUNE 30, 2025 AND 2024
(Disajikan dalam jutaan Rupiah, kecuali dinyatakan lain)                        (Expressed in millions of Rupiah, unless otherwise stated)


 30 Juni 2025                                        30 Juni/             30 Juni/
                                                     June 30,             June 30,
                                                       2025                 2024
 Arus kas dari aktivitas operasi                                                                               Cash flows from operating activities
 Penerimaan kas dari pelanggan                         191,391,642           181,810,225                               Cash receipts from customers
 Penerimaan kompensasi                                  37,450,897            17,835,197                                     Compensation received
 Penerimaan subsidi listrik                             36,211,768            29,687,289                               Government subsidy received
 Penerimaan restitusi pajak lainnya                      1,875,274               284,518                                Cash receipts for other taxes
 Penerimaan bunga                                          402,630               652,286                                            Interest received
 Pembayaran kas kepada pemasok                        (209,845,267)         (188,823,867)                                     Cash paid to suppliers
 Pembayaran kas kepada karyawan                        (17,271,611)          (15,029,120)                                   Cash paid to employees
 Pembayaran bunga                                      (11,279,097)          (10,149,149)                                      Interest expense paid
 Pembayaran pajak penghasilan                           (4,977,193)           (3,237,013)                                            Income tax paid
 Kas bersih diperoleh dari aktivitas operasi            23,959,044            13,030,367                Net cash provided from operating activities

 Arus kas dari aktivitas investasi                                                                              Cash flows from investing activities
 Perolehan dividen dari                                                                                                    Proceeds from devidends of
    entitas asosiasi dan ventura bersama                  400,024                192,377                          associates and joint ventures
 Hasil penjualan aset                                                                                                    Proceeds from sales of assets
    tidak digunakan dalam operasi                          122,531                45,372                                  not used in operations
 Perolehan aset tetap (termasuk uang muka              (24,998,630)          (24,247,622)         Addition of property, plant and equiptment (including
 proyek)                                                                                                                         advances for projects)
 Perolehan investasi pada                                                                                               Acquisition of investments in
    entitas asosiasi dan ventura bersama                   (95,553)             (184,071)                          associates and joint venture
 Penarikan rekening bank                                                                                                     Withdrawal of restricted
    dibatasi penggunaannya                                      -                907,601                                         cash in banks
 Penempatan rekening bank                                                                                                     Placement of restricted
    dibatasi penggunaannya                                (145,792)                  -                                           cash in banks
 Penarikan investasi jangka pendek                             -                 751,031                         Withdrawal of short term investments
 Penempatan investasi jangka pendek                       (272,646)                  -                           Placement of short term investments

 Kas bersih digunakan untuk aktivitas investasi        (24,990,066)          (22,535,312)                       Net cash used in investing activities




          Catatan atas laporan keuangan konsolidasian merupakan bagian   The accompanying notes to the consolidated financial statements
            yang tidak terpisahkan dari laporan keuangan konsolidasian    form an integral part of these consolidated financial statements
Page 10
                      PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                   DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                        Lampiran 4/2 Schedule

LAPORAN ARUS KAS KONSOLIDASIAN INTERIM                                             INTERIM CONSOLIDATED STATEMENTS OF
UNTUK PERIODE ENAM BULAN                                                                     CASH FLOWS FOR THE SIX MONTH
YANG BERAKHIR PADA TANGGAL                                                                                           PERIODS ENDED
30 JUNI 2025 DAN 2024                                                                                       JUNE 30, 2025 AND 2024
(Disajikan dalam jutaan Rupiah, kecuali dinyatakan lain)                        (Expressed in millions of Rupiah, unless otherwise stated)


 30 Juni 2025                                          30 Juni/             30 Juni/
                                                       June 30,             June 30,
                                                         2025                 2024

 Arus kas dari aktivitas pendanaan                                                                                Cash flows from financing activities
 Penerimaan penerusan pinjaman                                 29,198               14,378                                 Proceeds of two-step loans
 Pembayaran penerusan pinjaman                             (1,536,515)          (1,466,403)                             Repayments of two-step loans
 Pembayaran utang kepada pemerintah dan                                                                      Repayments of Government and non-bank
    lembaga keuangan Pemerintah non-bank                     (375,000)            (375,000)                Government financial institution loans
 Penerimaan utang bank jangka pendek                       20,000,000                  -                           Proceeds of bank loans- short term
 Penerimaan utang bank jangka panjang                         609,615              345,172                          Proceeds of bank loans- long term
 Pembayaran utang bank jangka pendek                      (20,000,000)                 -                        Repayments of bank loans- short term
 Pembayaran utang bank jangka panjang                     (11,671,351)         (13,527,889)                      Repayments of bank loans- long term
 Pembayaran utang obligasi dan sukuk ijarah                  (649,785)          (1,475,000)               Repayments of bonds payable and sukuk ijara
 Pembayaran utang sewa                                        (78,763)             (64,558)                               Payments of lease liabilities
 Pembayaran utang listrik swasta                             (308,028)            (283,167)                   Payments of electricity purchase payable
 Kas bersih digunakan dari aktivitas pendanaan                                                             Net cash flows used in financing activities
                                                          (13,980,629)         (16,832,467)


 (Penurunan)/Kenaikan bersih                                                                     Net (decrease)/increase in cash and cash equivalents
 kas dan setara kas                                       (15,011,652)         (26,337,412)

 Pengaruh perubahan kurs mata uang asing                     262,239              325,890                          Effect of changes in foreign currency
 Cadangan kerugian kredit ekspektasian                                                                             Allowance for expected credit loss of
    atas kas dan setara kas                                       (24)                  (8)                            cash and cash equivalents

 Kas dan setara kas awal periode                          61,364,446           55,920,541     Cash and cash equivalents at the beginning of the period

 Kas dan setara kas akhir periode                         46,615,010           29,909,011           Cash and cash equivalents at the end of the period


 Lihat Catatan 50 untuk penyajian informasi arus kas.                        Refer to Note 50 for the presentation of cash flow information.




          Catatan atas laporan keuangan konsolidasian merupakan bagian   The accompanying notes to the consolidated financial statements
            yang tidak terpisahkan dari laporan keuangan konsolidasian    form an integral part of these consolidated financial statements
Page 11
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                               Lampiran 5/1 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                             FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                        JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)    (Expressed in millions of Rupiah, unless otherwise stated)

1.   INFORMASI UMUM                                         1.   GENERAL INFORMATION

     a.   Pendirian dan informasi lainnya                        a.   Establishment and other information

          Perusahaan       Perseroan     (Persero)    PT              Perusahaan       Perseroan       (Persero)     PT
          Perusahaan Listrik Negara (“PLN” atau                       Perusahaan Listrik Negara (“PLN” or the
          “Perusahaan”) didirikan pada tahun 1961                     “Company”) was established in 1961 as a unit
          dalam bentuk jawatan di dalam lingkungan                    of the Indonesian Ministry of Energy and Public
          Kementerian Pekerjaan Umum dan Tenaga.                      Works. The Company is a business
          Perusahaan merupakan kelanjutan usaha                       continuation of several Dutch electricity
          beberapa perusahaan listrik Belanda yang                    companies which have been taken over by the
          diambil alih oleh Pemerintah Republik                       Government of the Republic of Indonesia
          Indonesia tersebut meliputi: NV ANIEM, NV                   including, among others, the following: NV
          SEM, NV OJEM, NV EMS, NV EMBALOM, NV                        ANIEM, NV SEM, NV OJEM, NV EMS, NV
          GEBEO, NV OGEM dan NV WEMI.                                 EMBALOM, NV GEBEO, NV OGEM and NV
          Berdasarkan Peraturan Pemerintah No. 19                     WEMI. Based on Government Regulation No.
          tahun 1965, status Perusahaan berubah                       19 year 1965, the status of the Company was
          menjadi perusahaan yang berbadan hukum.                     changed to that of a legal entity. Subsequently,
          Selanjutnya ditetapkan menjadi Perusahaan                   based on Government Regulation No. 30 year
          Umum berdasarkan Peraturan Pemerintah No.                   1970, as amended by Government Regulation
          30 tahun 1970 yang dipertegas dengan                        No. 18 year 1972, the Company became a
          Peraturan Pemerintah No. 18 tahun 1972.                     Perusahaan Umum. Based on Notarial Deed
          Kemudian berdasarkan Akta No. 169 tanggal                   No. 169 of Sutjipto, S.H., notary in Jakarta,
          30 Juli 1994 dari Sutjipto, S.H., notaris di                dated July 30, 1994, the Company’s status was
          Jakarta, status badan hukum Perusahaan                      changed to a Limited Liability Company and it
          berubah menjadi Perseroan Terbatas dengan                   was named Perusahaan Perseroan PT
          nama Perusahaan Perseroan PT Perusahaan                     Perusahaan Listrik Negara or PT PLN
          Listrik Negara disingkat PT PLN (Persero). Akta             (Persero). This change was approved by the
          perubahan ini disahkan dengan Keputusan                     Minister of Justice in his decision letter No. C2-
          Menteri        Kehakiman         No.        C2-             11.519.HT.01.01.Th.94 dated August 1, 1994
          11.519.HT.01.01.Th.94 tanggal 1 Agustus                     and was published in State Gazette of the
          1994, serta diumumkan dalam Berita Negara                   Republic of Indonesia No. 73 dated September
          Republik Indonesia No. 73 tanggal 13 September              13, 1994, Supplement No. 6731.
          1994, Tambahan No. 6731.

          Anggaran Dasar Perusahaan telah diubah                      The Articles of Association of the Company
          beberapa kali dengan perubahan terakhir                     have been amended several times, with the
          berdasarkan Akta Notaris No. 24, tanggal 16                 most recent change by Notarial Deed No. 24,
          April 2025 dari Muhammad Hanafi, S.H.,                      dated April 16, 2025 of Muhammad Hanafi,
          Notaris di Jakarta mengenai perubahan modal                 S.H., Notary in Jakarta regarding the capital and
          dan tugas wewenang Direksi. Perubahan ini                   duties authority of the board directors. This
          telah disetujui oleh Menteri Hukum dan Hak                  amendment has been approved by the Minister
          Asasi      Manusia     Republik    Indonesia                of Law and Human Rights based on Ministerial
          berdasarkan Surat Keputusan Menteri No.                     Decree No. AHU-AH.01.03-0131933, dated
          AHU-AH.01.03-0131933 tanggal 15 Mei 2025.                   May 15, 2025.

          Perusahaan berdomisili di Jakarta dan memiliki              The Company is domiciled in Jakarta, with 48
          48 unit pelaksana yang tersebar di wilayah                  business unit offices across Indonesia and 11
          Indonesia dan 11 entitas anak. Kantor Pusat                 subsidiaries. The Company’s Head Office is
          Perusahaan beralamat di Jl. Trunojoyo Blok M                located at Jl. Trunojoyo Blok M I No. 135,
          I No. 135, Jakarta.                                         Jakarta.
Page 12
                       PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                    DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                  Lampiran 5/2 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                  NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                         FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                                    JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                (Expressed in millions of Rupiah, unless otherwise stated)

1.   INFORMASI UMUM (lanjutan)                                                      1.       GENERAL INFORMATION (continued)

     a.   Pendirian dan informasi lainnya (lanjutan)                                         a.         Establishment             and         other           information
                                                                                                        (continued)

          Sesuai dengan Pasal 3 Anggaran Dasar                                                          In accordance with Article 3 of the Company’s
          Perusahaan, Maksud dan Tujuan Perusahaan                                                      Articles of Association, the Purpose and
          adalah untuk menyelenggarakan usaha                                                           Objective of the Company is to engage in
          penyediaan tenaga listrik bagi kepentingan                                                    electricity business for public use of sufficient
          umum dalam jumlah dan mutu yang memadai                                                       quantity and quality and also to earn profit and
          serta     memupuk       keuntungan     dan                                                    perform the Government’s assignment in
          melaksanakan penugasan Pemerintah di                                                          electricity business in order to support the
          bidang ketenagalistrikan dalam      rangka                                                    development of the country with the application of
          mendukung pembangunan negara dengan                                                           the principles of a Limited Liability Company.
          menerapkan     prinsip-prinsip   Perseroan
          Terbatas.

          Sesuai dengan Undang-Undang No. 19 tahun                                                      Based on Law No. 19 year 2003, regarding State-
          2003 tentang Badan Usaha Milik Negara                                                         Owned Enterprises (“SOEs”), the Government is
          (“BUMN”), Pemerintah wajib memberikan                                                         obliged to provide compensation to SOEs, that
          kompensasi atas semua biaya yang telah                                                        were appointed to perform special assignments,
          dikeluarkan oleh BUMN termasuk margin                                                         for all expenses which they have incurred,
          tertentu yang diharapkan kepada BUMN yang                                                     including a certain expected return (margin). The
          diberikan penugasan khusus. Perusahaan                                                        Company is an SOE, that performs the special
          merupakan BUMN yang sedang melaksanakan                                                       assignment of providing subsidised electricity to
          penugasan khusus berupa penyediaan tenaga                                                     the public (Note 37).
          listrik bersubsidi kepada masyarakat (Catatan
          37).

          Pada tanggal 30 Juni 2025, Grup memiliki                                                      As at June 30, 2025 the Group had 51,113
          51.113 karyawan tetap (tidak diaudit)                                                         permanent employees (unaudited) (December
          (Desember 2024: 51.435 karyawan tetap).                                                       2024: 51,435 permanent employees). The total
          Jumlah karyawan tidak termasuk karyawan dari                                                  number of employees does not include
          PT Haleyora Powerindo yang bergerak                                                           employees of PT Haleyora Powerindo whose
          dibidang jasa tenaga kerja. PT Haleyora                                                       nature of business is manpower services. PT
          Powerindo adalah entitas anak dari PT                                                         Haleyora Powerindo is a subsidiary of PT
          Haleyora Power, entitas anak Perusahaan.                                                      Haleyora Power, the Company’s subsidiary.

     b.   Penawaran umum efek utang Perusahaan                                               b.         The Company’s public offering of bonds

          Perusahaan telah beberapa kali menerbitkan                                                    The Company has issued several PLN Bonds
          Obligasi dan Surat Utang PLN, sebagai berikut:                                                and Notes, as follows:
                                                                                                                         Jumlah yang
                                                                                                      Tanggal             ditawarkan/
                                               Tanggal efektif/      Bursa pencatatan/               pencatatan/        Offered amount
                                                Effective date          Listed on *)                 Listed date              Rp

          Obligasi Rupiah                                                                                                                                          Rupiah Bonds

          Obligasi Berkelanjutan IV PLN                                                                                                         Shelf Registration Bonds IV PLN
          Tahap I Tahun 2020                   31 Agustus 2020/     Bursa Efek Indonesia/         8 September 2020/            1,500,000                      Phase I Year 2020
                                               August 31, 2020    Indonesia Stock Exchange        September 8, 2020
          Sukuk Ijarah Berkelanjutan IV PLN                                                                                                  Shelf Registration Sukuk Ijara IV PLN
          Tahap I Tahun 2020                   31 Agustus 2020/      Bursa Efek Indonesia/        8 September 2020/              376,500                        Phase I Year 2020
                                               August 31, 2020    Indonesia Stock Exchange        September 8, 2020
          Obligasi Berkelanjutan III PLN                                                                                                          Shelf Registration Bonds III PLN
          Tahap VII Tahun 2020                  29 Juni 2018/        Bursa Efek Indonesia/           6 Mei 2020/                1,737,135                    Phase VII Year 2020
                                                June 29, 2018     Indonesia Stock Exchange           May 6, 2020
          Obligasi Berkelanjutan III PLN                                                                                                          Shelf Registration Bonds III PLN
          Tahap VI Tahun 2020                   29 Juni 2018/        Bursa Efek Indonesia/        18 Februari 2020/             4,812,430                     Phase VI Year 2020
                                                June 29, 2018     Indonesia Stock Exchange        February 18, 2020
          Sukuk Ijarah Berkelanjutan III PLN                                                                                                  Shelf Registration Sukuk Ijara III PLN
          Tahap VI Tahun 2020                   29 Juni 2018/        Bursa Efek Indonesia/        18 Februari 2020/              115,500                       Phase VI Year 2020
                                                June 29, 2018     Indonesia Stock Exchange        February 18, 2020
          Obligasi Berkelanjutan III PLN                                                                                                          Shelf Registration Bonds III PLN
          Tahap V Tahun 2019                    29 Juni 2018/        Bursa Efek Indonesia/         1 Oktober, 2019              1,912,900                      Phase V Year 2019
                                                June 29, 2018     Indonesia Stock Exchange         October 1, 2019
          Sukuk Ijarah Berkelanjutan III PLN                                                                                                  Shelf Registration Sukuk Ijara III PLN
          Tahap V Tahun 2019                    29 Juni 2018/        Bursa Efek Indonesia/         1 Oktober, 2019               797,500                        Phase V Year 2019
                                                June 29, 2018     Indonesia Stock Exchange         October 1, 2019
          Obligasi Berkelanjutan III PLN                                                                                                          Shelf Registration Bonds III PLN
          Tahap IV Tahun 2019                   29 Juni 2018/        Bursa Efek Indonesia/         1 Agustus 2019/              2,953,620                     Phase IV Year 2019
                                                June 29, 2018     Indonesia Stock Exchange         August 1, 2019

          *)    Pada tanggal 22 Juli 1995 Bursa Paralel Indonesia diakuisisi oleh                  *)     On July 22, 1995 the Indonesia Parallel Exchange was acquired by the
                Bursa Efek Surabaya. Pada tanggal 30 November 2007, Bursa                                 Surabaya Stock Exchange. On November 30, 2007, the Surabaya Stock
                Efek Surabaya dan Bursa Efek Jakarta digabungkan dan berubah                              Exchange and Jakarta Stock Exchange merged and changed their
                nama menjadi Bursa Efek Indonesia.                                                        name to the Indonesia Stock Exchange.
Page 13
                       PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                    DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                    Lampiran 5/3 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                     NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                            FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                                       JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                   (Expressed in millions of Rupiah, unless otherwise stated)

1.   INFORMASI UMUM (lanjutan)                                                           1.       GENERAL INFORMATION (continued)

     b.   Penawaran umum efek utang Perusahaan                                                    b.      The Company’s public offering of bonds
          (lanjutan)                                                                                      (continued)

          Perusahaan telah beberapa kali menerbitkan                                                      The Company has issued several PLN Bonds
          Obligasi dan Surat Utang PLN, sebagai berikut:                                                  and Notes, as follows: (continued)
          (lanjutan)
                                                                                                                            Jumlah yang
                                                                                                           Tanggal           ditawarkan/
                                                Tanggal efektif/        Bursa pencatatan/                 pencatatan/      Offered amount
                                                 Effective date            Listed on *)                   Listed date            Rp

          Sukuk Ijarah Berkelanjutan III PLN                                                                                                   Shelf Registration Sukuk Ijara III PLN
          Tahap IV Tahun 2019                    29 Juni 2018/         Bursa Efek Indonesia/            1 Agustus 2019/           1,250,000                     Phase IV Year 2019
                                                 June 29, 2018      Indonesia Stock Exchange            August 1, 2019
          Obligasi Berkelanjutan III PLN                                                                                                           Shelf Registration Bonds III PLN
          Tahap III Tahun 2019                   29 Juni 2018/         Bursa Efek Indonesia/           19 Februari 2019/          2,393,000                    Phase III Year 2019
                                                 June 29, 2018      Indonesia Stock Exchange           February 19, 2019
          Sukuk Ijarah Berkelanjutan III PLN                                                                                                   Shelf Registration Sukuk Ijara III PLN
          Tahap III Tahun 2019                   29 Juni 2018/         Bursa Efek Indonesia/           19 Februari 2019/           863,000                       Phase III Year 2019
                                                 June 29, 2018      Indonesia Stock Exchange           February 19, 2019
          Obligasi Berkelanjutan III PLN                                                                                                           Shelf Registration Bonds III PLN
          Tahap II Tahun 2018                    29 Juni 2018/         Bursa Efek Indonesia/            10 Oktober 2018/           832,000                      Phase II Year 2018
                                                 June 29, 2018      Indonesia Stock Exchange            October 10, 2018
          Sukuk Ijarah Berkelanjutan III PLN                                                                                                   Shelf Registration Sukuk Ijara III PLN
          Tahap II Tahun 2018                    29 Juni 2018/         Bursa Efek Indonesia/            10 Oktober 2018/           224,000                       Phase II Year 2018
                                                 June 29, 2018      Indonesia Stock Exchange            October 10, 2018
          Obligasi Berkelanjutan III PLN                                                                                                           Shelf Registration Bonds III PLN
          Tahap I Tahun 2018                     29 Juni 2018/         Bursa Efek Indonesia/             10 Juli 2018/            1,278,500                      Phase I Year 2018
                                                 June 29, 2018      Indonesia Stock Exchange             July 10, 2018
          Sukuk Ijarah Berkelanjutan III PLN                                                                                                   Shelf Registration Sukuk Ijara III PLN
          Tahap I Tahun 2018                     29 Juni 2018/         Bursa Efek Indonesia/             10 Juli 2018/             750,000                        Phase I Year 2018
                                                 June 29, 2018      Indonesia Stock Exchange             July 10, 2018
          Obligasi Berkelanjutan II PLN                                                                                                             Shelf Registration Bonds II PLN
          Tahap III Tahun 2018                   21 Juni 2017/         Bursa Efek Indonesia/           23 Februari 2018/          2,535,000                    Phase III Year 2018
                                                 June 21, 2017      Indonesia Stock Exchange           February 23, 2018
          Sukuk Ijara Berkelanjutan II PLN                                                                                                     Shelf Registration Sukuk Ijara II PLN
          Tahap III Tahun 2018                   21 Juni 2017/         Bursa Efek Indonesia/           23 Februari 2018/           698,500                      Phase III Year 2018
                                                 June 21, 2017      Indonesia Stock Exchange           February 23, 2018
          Obligasi Berkelanjutan II PLN                                                                                                             Shelf Registration Bonds II PLN
          Tahap II Tahun 2017                    21 Juni 2017/         Bursa Efek Indonesia/           2 November 2017/           2,545,500                     Phase II Year 2017
                                                 June 21, 2017      Indonesia Stock Exchange           November 2, 2017
          Sukuk Ijarah Berkelanjutan II PLN                                                                                                    Shelf Registration Sukuk Ijara II PLN
          Tahap II Tahun 2017                    21 Juni 2017/         Bursa Efek Indonesia/           2 November 2017/            694,500                       Phase II Year 2017
                                                 June 21, 2017      Indonesia Stock Exchange           November 2, 2017
          Obligasi Berkelanjutan II PLN                                                                                                             Shelf Registration Bonds II PLN
          Tahap I Tahun 2017                     21 Juni 2017/         Bursa Efek Indonesia/             12 Juli 2017/            1,600,000                      Phase I Year 2017
                                                 June 21, 2017      Indonesia Stock Exchange             July 12, 2017
          Sukuk Ijarah Berkelanjutan II PLN                                                                                                    Shelf Registration Sukuk Ijara II PLN
          Tahap I Tahun 2017                     21 Juni 2017/         Bursa Efek Indonesia/             12 Juli 2017/             400,000                       Phase I Year 2017
                                                 June 21, 2017      Indonesia Stock Exchange             July 12, 2017
          Obligasi Berkelanjutan I PLN                                                                                                               Shelf Registration Bonds I PLN
          Tahap II Tahun 2013                    27 Juni 2013/         Bursa Efek Indonesia/           11 Desember 2013/          1,244,000                     Phase II Year 2013
                                                 June 27, 2013      Indonesia Stock Exchange           December 11, 2013
          Sukuk Ijarah Berkelanjutan I PLN                                                                                                      Shelf Registration Sukuk Ijara I PLN
          Tahap II Tahun 2013                    27 Juni 2013/         Bursa Efek Indonesia/           11 Desember 2013/           429,000                       Phase II Year 2013
                                                 June 27, 2013      Indonesia Stock Exchange           December 11, 2013
          Obligasi Berkelanjutan I PLN                                                                                                               Shelf Registration Bonds I PLN
          Tahap I Tahun 2013                     27 Juni 2013/         Bursa Efek Indonesia/              8 Juli 2013/             879,000                       Phase I Year 2013
                                                 June 27, 2013      Indonesia Stock Exchange              July 8, 2013
          Sukuk Ijarah Berkelanjutan I PLN                                                                                                      Shelf Registration Sukuk Ijara I PLN
          Tahap I Tahun 2013                      27 Juni 2013/        Bursa Efek Indonesia/               8 Juli 2013/            121,000                        Phase I Year 2013
                                                  June 27, 2013     Indonesia Stock Exchange               July 8, 2013
          Obligasi PLN XII Tahun 2010             30 Juni 2010/        Bursa Efek Indonesia/               9 Juli 2010/           2,500,000               PLN XII Bonds Year 2010
                                                  June 30, 2010     Indonesia Stock Exchange               July 9, 2010
          Sukuk Ijarah PLN V Tahun 2010           30 Juni 2010/        Bursa Efek Indonesia/               9 Juli 2010/            500,000            Sukuk Ijara V PLN Year 2010
                                                  June 30, 2010     Indonesia Stock Exchange               July 9, 2010
          Obligasi PLN XI Tahun 2010           31 Desember 2009/       Bursa Efek Indonesia/            13 Januari 2010/          2,703,000               PLN XI Bonds Year 2010
                                               December 31, 2009    Indonesia Stock Exchange            January 13, 2010
          Sukuk Ijarah PLN IV Tahun 2010       31 Desember 2009/       Bursa Efek Indonesia/            13 Januari 2010/           297,000            Sukuk Ijara IV PLN Year 2010
                                               December 31, 2009    Indonesia Stock Exchange            January 13, 2010
          Obligasi PLN X Tahun 2009            31 Desember 2008/       Bursa Efek Indonesia/            12 Januari 2009/          1,440,000                PLN X Bonds Year 2009
                                               December 31, 2008    Indonesia Stock Exchange            January 12, 2009
          Sukuk Ijarah PLN III Tahun 2009      31 Desember 2008/       Bursa Efek Indonesia/            12 Januari 2009/           760,000            Sukuk Ijara III PLN Year 2009
                                               December 31, 2008    Indonesia Stock Exchange            January 12, 2009
          Obligasi PLN IX Tahun 2007              29 Juni 2007/        Bursa Efek Surabaya/               11 Juli 2007/           2,700,000               PLN IX Bonds Year 2007
                                                  June 29, 2007      Surabaya Stock Exchange              July 11, 2007
          Sukuk Ijarah PLN II Tahun 2007          29 Juni 2007/        Bursa Efek Surabaya/               11 Juli 2007/            300,000             Sukuk Ijara II PLN Year 2007
                                                  June 29, 2007      Surabaya Stock Exchange              July 11, 2007
          Obligasi PLN VIII Tahun 2006            12 Juni 2006/        Bursa Efek Surabaya/               22 Juni 2016/           2,200,100              PLN VIII Bonds Year 2006
                                                  June 12, 2006      Surabaya Stock Exchange             June 22, 2016
          Sukuk Ijarah PLN I Tahun 2006           12 Juni 2006/        Bursa Efek Surabaya/               22 Juni 2016/            200,000             Sukuk Ijara I PLN Year 2006
                                                  June 12, 2006      Surabaya Stock Exchange             June 22, 2016
          Obligasi PLN VII Tahun 2004           3 November 2004/       Bursa Efek Surabaya/            12 November 2004/          1,500,000               PLN VII Bonds Year 2004
                                                November 3, 2004     Surabaya Stock Exchange           November 12, 2004
          Obligasi PLN VI Tahun 1997              27 Juni 1997/        Bursa Efek Surabaya/             12 Agustus 1997/           600,000                PLN VI Bonds Year 1997
                                                  June 27, 1997      Surabaya Stock Exchange            August 12, 1997
          Obligasi PLN V Tahun 1996               28 Juni 1996/        Bursa Efek Surabaya/             28 Agustus 1996/          1,000,000                PLN V Bonds Year 1996
                                                  June 28, 1996      Surabaya Stock Exchange            August 28, 1996
          Obligasi PLN IV Tahun 1995              30 Juni 1995/       Bursa Paralel Indonesia/         4 September 1995/           680,000                PLN IV Bonds Year 1995
                                                  June 30, 1995     Indonesia Parallel exchange        September 4, 1995
          Obligasi PLN III Tahun 1995            30 Januari 1995/     Bursa Paralel Indonesia/            18 April 1995/           318,430                 PLN III Bonds Year 1995
                                                January 30, 1995    Indonesia Parallel exchange           April 18, 1995
          Obligasi PLN II Tahun 1993           28 September 1993/     Bursa Paralel Indonesia/         8 November 1993/            600,000                 PLN II Bonds Year 1993
                                               September 28, 1993   Indonesia Parallel exchange        November 8, 1993
          Obligasi PLN I Tahun 1992            25 September 1992/     Bursa Paralel Indonesia/         10 November 1992/           300,000                  PLN I Bonds Year 1992
                                               September 25, 1992   Indonesia Parallel exchange        November 10, 1992

          Jumlah                                                                                                                 51,541,115                                    Total

          *)    Pada tanggal 22 Juli 1995 Bursa Paralel Indonesia diakuisisi oleh                         *)    On July 22, 1995 the Indonesia Parallel Exchange was acquired
                Bursa Efek Surabaya. Pada tanggal 30 November 2007, Bursa                                       by the Surabaya Stock Exchange. On November 30, 2007, the
                Efek Surabaya dan Bursa Efek Jakarta digabungkan dan berubah                                    Surabaya Stock Exchange and Jakarta Stock Exchange merged
                nama menjadi Bursa Efek Indonesia.                                                              and changed their name to the Indonesia Stock Exchange.
Page 14
                      PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                   DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                             Lampiran 5/4 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                              NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                     FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                                JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                            (Expressed in millions of Rupiah, unless otherwise stated)

1.   INFORMASI UMUM (lanjutan)                                                      1.   GENERAL INFORMATION (continued)

     b.   Penawaran umum efek utang Perusahaan                                           b.      The Company’s public offering of bonds
          (lanjutan)                                                                             (continued)

          Perusahaan telah beberapa kali menerbitkan                                             The Company has issued several PLN Medium-
          Surat Utang Jangka Menengah PLN, sebagai                                               term Notes, as follows:
          berikut:
                                                                                                                       Jumlah yang
                                                                                                  Tanggal               ditawarkan/
                                         Tanggal efektif/       Bursa pencatatan/                pencatatan/          Offered amount
                                          Effective date            Listed on                    Listed date               USD *)

          Surat Utang Jangka Menengah                                                                                                         Global Medium Term
          Global - USD                                                                                                                                 Notes - USD
          Penerbitan tahun 2020            30 Juni 2020/       Bursa Efek Singapura/              1 Juli 2020/            1,500,000,000              Issued in 2020
                                          June 30, 2020      Singapore Stock Exchange             July 1, 2020
          Penerbitan tahun 2019         5 November 2019/       Bursa Efek Singapura/          7 November 2019/            1,000,000,000              Issued in 2019
                                        November 5, 2019     Singapore Stock Exchange         November 7, 2019
                                           17 Juli 2019/       Bursa Efek Singapura/             18 Juli 2019/            1,400,000,000
                                           July 17, 2019     Singapore Stock Exchange            July 18, 2019
          Penerbitan tahun 2018          25 Oktober 2018/      Bursa Efek Singapura/           26 Oktober 2018/           1,000,000,000              Issued in 2018
                                         October 25, 2018    Singapore Stock Exchange          October 26, 2018
                                           21 Mei 2018/        Bursa Efek Singapura/             16 Mei 2018/             2,000,000,000
                                           May 21, 2018      Singapore Stock Exchange            May 16, 2018
          Penerbitan tahun 2017            15 Mei 2017/        Bursa Efek Singapura/             16 Mei 2017/             2,000,000,000              Issued in 2017
                                           May 15, 2017      Singapore Stock Exchange            May 16, 2017
          Penerbitan tahun 2012          24 Oktober 2012/      Bursa Efek Singapura/           25 Oktober 2012/           1,000,000,000              Issued in 2012
                                         October 24, 2012    Singapore Stock Exchange          October 25, 2012
          Penerbitan tahun 2011         22 November 2011/      Bursa Efek Singapura/          23 November 2011/           1,000,000,000              Issued in 2011
                                        November 22, 2011    Singapore Stock Exchange         November 23, 2011
          Jumlah                                                                                                         10,900,000,000                      Total

          Surat Utang Jangka Menengah                                                                                                         Global Medium Term
          Global - EUR                                                                                                                                 Notes - EUR
          Penerbitan tahun 2019         5 November 2019/       Bursa Efek Singapura/          7 November 2019/               500,000,000             Issued in 2019
                                        November 5, 2019     Singapore Stock Exchange         November 7, 2019
          Penerbitan tahun 2018         25 Oktober 2018/       Bursa Efek Singapura/          26 Oktober 2018/               500,000,000             Issued in 2018
                                        October 25, 2018     Singapore Stock Exchange         October 26, 2018
          Jumlah                                                                                                          1,000,000,000                      Total

          Surat Utang Jangka Menengah                                                                                                         Global Medium Term
          Global - JPY                                                                                                                                 Notes - JPY
          Penerbitan tahun 2019         20 September 2019/        Tidak tercatat/                     N/A                23,200,000,000              Issued in 2019
                                        September 20, 2019          Not listed
          Jumlah                                                                                                         23,200,000,000                      Total


          *)   Dalam jumlah penuh                                                                *)     In full amount

          Majapahit Holding B.V., Belanda, entitas anak                                          Majapahit Holding B.V., the Netherlands, a
          yang bertujuan khusus yang sepenuhnya milik                                            wholly-owned special-purpose subsidiary of the
          Perusahaan, menerbitkan Obligasi Terjamin,                                             Company, issued Guaranteed Notes, as follows:
          sebagai berikut:
                                                                                                                       Jumlah yang
                                                                                                  Tanggal               ditawarkan/
                                         Tanggal efektif/       Bursa pencatatan/                pencatatan/          Offered amount
                                          Effective date            Listed on                    Listed date               USD *)

          Obligasi Terjamin - USD                                                                                                          Guaranteed Notes - USD
          Penerbitan 2009               6 November 2009/       Bursa Efek Singapura/          9 November 2009/            1,250,000,000             Issued in 2009
                                        November 6, 2009     Singapore Stock Exchange         November 9, 2009
          Penerbitan 2009                7 Agustus 2009/       Bursa Efek Singapura/          11 Agustus 2009/               750,000,000             Issued in 2009
                                          August 7, 2009     Singapore Stock Exchange          August 11, 2009
          Penerbitan 2007                  28 Juni 2007/       Bursa Efek Singapura/            29 Juni 2007/             1,000,000,000              Issued in 2007
                                          June 28, 2007      Singapore Stock Exchange           June 29, 2007
          Penerbitan 2006               16 Oktober 2006/       Bursa Efek Singapura/          17 Oktober 2006/            1,000,000,000              Issued in 2006
                                        October 16, 2006     Singapore Stock Exchange         October 17, 2006
          Jumlah                                                                                                          4,000,000,000                      Total


          *)   Dalam jumlah penuh                                                                  *)       In full amount
Page 15
                     PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                  DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                         Lampiran 5/5 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                         NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                           JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                       (Expressed in millions of Rupiah, unless otherwise stated)

1.   INFORMASI UMUM (lanjutan)                                                1.   GENERAL INFORMATION (continued)

     c.   Susunan pengurus dan informasi lain                                      c.     Management and other information

          Pada tanggal 30 Juni 2025 dan 31 Desember                                       As at June 30, 2025 and December 31, 2024, the
          2024, susunan pengurus Perusahaan adalah                                        Company’s management consisted of the
          sebagai berikut:                                                                following:

 \                                                     30 Juni 2025/                      31 Desember 2024 /
                                                      June 30, 2025                       December 31,2024
      Dewan Komisaris                                                                                                                 Board of Commissioners
      Komisaris Utama                                 Burhanuddin Abdullah               Burhanuddin Abdullah                           President Commissioner
      Wakil Komisaris Utama                             Suahasil Nazara                    Suahasil Nazara                         Vice President Commissioner
      Komisaris                                         Dadan Kusdiana                     Dadan Kusdiana                                       Commissioners
                                                                                           Aminuddin Ma’ruf
                                                        Aminuddin Ma’ruf
                                                                                        Jisman Parada Hutajulu
                                                     Jisman Parada Hutajulu              Susiwijono Moegiarso
                                                    Bambang Eko Suhariyanto


      Komisaris Independen                                  Andi Arief                         Andi Arief                           Independent Commissioners
                                                           Yazid Fanani                     Yazid Fanani
                                                        Ali Masykur Musa                   Ali Masykur Musa
                                                                                           Mutanto Juwono
                                                        Mutanto Juwono

      Direksi                                                                                                                                Board of Directors
      Direktur Utama                                   Darmawan Prasodjo                  Darmawan Prasodjo                                    President Director
      Direktur Keuangan                                  Sinthya Roesly                     Sinthya Roesly                                    Director of Finance
      Direktur Perencanaan Korporat                                                                                              Director of Corporate Planning
      dan Pengembangan Bisnis                          Hartanto Wibowo                     Hartanto Wibowo                           and Business Development
      Direktur Legal dan Manajemen Human               Yusuf Didi Setiarto                 Yusuf Didi Setiarto             Director of Legal and Human Capital
       Capital                                                                                                                                   Management
      Direktur Retail dan Niaga                            Adi Priyanto                      Edi Srimulyanti                   Director of Retail and Commerce
      Direktur Transmisi dan Perencanaan Sistem        Edwin Nugraha Putra                    Evy Haryadi        Director of Transmission and System Planning
      Direktur Manajemen Pembangkitan                 Rizal Calvary Marimbo                   Adi Lumakso                   Director of Generation Management
      Direktur Distribusi                         Arsyadany Ghana Akmalaputri                 Adi Priyanto                                Director of Distribution
      Direktur Manajemen Proyek                                                                                           Director of Management Projects and
         dan Energi Baru Terbarukan                     Suroso Isnandar                   Wiluyo Kusdwiharto                            New Renewable Energy
      Direktur Manajemen Risiko                          Adi Lumakso                       Suroso Isnandar                         Director of Risk Management
      Direktur Teknologi, Engineering, dan                Evy Haryadi
        Keberlanjutan

      Komite Audit
      Ketua                                               Yazid Fanani                       Yazid Fanani                                     Audit Committee
      Anggota                                           Aminuddin Ma’ruf                   Aminuddin Ma’ruf                                          Chairman
                                                     Jisman Parada Hutajulu             Jisman Parada Hutajulu                                       Members
                                                            Andi Arief                         Andi Arief
                                                        Mutanto Juwono                     Mutanto Juwono
                                                        Dwi Siska Susanti                  Dwi Siska Susanti
                                                     Oktofriawan Hagiardana             Tomi Parisianto Wibowo
                                                      Flodesa Anggarijanto              Oktofriawan Hagiardana

      Sekretaris Perusahaan
                                                                                                                                            Corporate Secretary
      Sekretaris Perusahaan                            Alois Wisnuhardana                 Alois Wisnuhardana                                 Corporate Secretary
          `
Page 16
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/6 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                         NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                           JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)       (Expressed in millions of Rupiah, unless otherwise stated)

2.   PENERAPAN PRINSIP AKUNTANSI YANG                          2.   IMPLEMENTATION      OF                 INDONESIAN
     BERLAKU UMUM DI INDONESIA (“PABU”)                             GENERALLY      ACCEPTED               ACCOUNTING
                                                                    PRINCIPLES (“GAAP”)

     a.   Penerapan Peraturan Jasa Keuangan No.                     a.   Implementation   of  Financial   Services
          6/POJK.04/2017 tentang Perlakuan Akuntansi                     Authority Regulation No. 6/POJK.04/2017
          atas Transaksi Berdasarkan Perjanjian Jual                     regarding   Accounting    Treatment    for
          Beli Tenaga Listrik (“POJK No. 6”)                             Transactions Based on Power Purchase
                                                                         Agreements (“POJK No. 6”)

          Grup mengadakan perjanjian jual beli tenaga                    The Group has entered into Power Purchase
          listrik, yakni Perjanjian Jual Beli Tenaga Listrik             Agreements (“PPAs”) and Energy Sales
          (“PPA”) dan Kontrak Penjualan Energi (“ESC”),                  Contracts (“ESCs”), with Independent Power
          dengan Penyedia dan Pengembang Tenaga                          Producers (“IPPs”). Those IPPs are holders of
          Listrik Swasta (“IPP”). IPP tersebut merupakan                 Electricity Business Licences for public use.
          pemegang Izin Usaha Ketenagalistrikan untuk
          kepentingan umum.

          Sebelum 1 Januari 2016, Grup menerapkan                        Before January 1, 2016, the Group applied
          Interpretasi Standar Akuntansi Keuangan                        Interpretation    of   Financial   Accounting
          (“ISAK”) No. 8: “Penentuan Apakah Suatu                        Standards (“IFAS”) No. 8: “Determining
          Perjanjian Mengandung Suatu Sewa” (“ISAK                       Whether an Arrangement Contains a Lease”
          No. 8”) dalam mengevaluasi apakah PPA dan                      (“IFAS No. 8”) in evaluating whether PPAs and
          ESC dengan IPP mengandung unsur sewa                           ESCs with IPPs contain a lease (Note 3.l).
          (Catatan 3.l).

          Pada tanggal 1 Maret 2017, Otoritas Jasa                       On March 1, 2017, the Financial Services
          Keuangan (“OJK”) menerbitkan POJK No. 6                        Authority (“FSA”) issued POJK No. 6 which is
          yang berlaku bagi Emiten dan Perusahaan                        applicable for listed and public companies.
          Publik. Berdasarkan POJK No. 6, transaksi                      Based on POJK No. 6, transactions based on a
          berdasarkan perjanjian jual beli tenaga listrik                PPA are treated as sale and purchase
          diperlakukan sebagai transaksi jual beli,                      transactions, even though the PPAs contain
          meskipun perjanjian jual beli tenaga listrik                   substances other than that of the sale and
          tersebut mengandung substansi selain jual beli                 purchase of electricity. POJK No. 6 applies
          listrik. POJK No. 6 berlaku secara prospektif                  prospectively for the year beginning on January
          untuk tahun buku yang dimulai sejak                            1, 2017, and early implementation is allowed for
          1 Januari 2017 dan mengizinkan perlakuan                       the year beginning on January 1, 2016. POJK
          lebih awal sejak 1 Januari 2016. POJK No. 6                    No. 6 is valid until the end of the assignment on
          berlaku sampai akhir tahun buku berakhirnya                    the acceleration of electricity infrastructure
          penugasan untuk percepatan pembangunan                         development in accordance with Presidential
          infrastruktur ketenagalistrikan berdasarkan                    Regulation No. 14 year 2017.
          Peraturan Presiden No. 14 tahun 2017.

          Grup memutuskan untuk menerapkan lebih                         The Group decided to implement POJK No. 6
          awal POJK No. 6 secara prospektif sejak                        early prospectively beginning on January 1,
          1 Januari 2016. Oleh karena itu, transaksi                     2016. Therefore, the electricity sale and
          berdasarkan perjanjian jual beli tenaga listrik                purchase transactions based on PPAs which
          yang mengandung sewa (Catatan 3.l), mulai                      contain a lease (Note 3.l), since January 1,
          1 Januari 2016 disajikan sebagai pembelian                     2016, are presented as purchases of electricity
          tenaga listrik dalam laporan laba rugi dan                     in the consolidated statement of profit or loss
          penghasilan komprehensif lain konsolidasian                    and other comprehensive income when
          pada tahun terjadinya. Pada tanggal                            incurred. On January 1, 2016, the Group also
          1 Januari 2016, Grup juga melakukan                            adjusted the related assets and liabilities.
          penyesuaian atas aset dan liabilitas terkait.
Page 17
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                               Lampiran 5/7 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                               FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                          JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)      (Expressed in millions of Rupiah, unless otherwise stated)

2.   PENERAPAN PRINSIP AKUNTANSI YANG                         2.   IMPLEMENTATION        OF        INDONESIAN
     BERLAKU UMUM DI INDONESIA (“PABU”)                            GENERALLY      ACCEPTED        ACCOUNTING
     (lanjutan)                                                    PRINCIPLES (“GAAP”) (continued)

     a.   Penerapan      Peraturan      Otoritas    Jasa           a.      Implementation   of  Financial     Services
          Keuangan No. 6/POJK.04/2017 tentang                              Authority Regulation No. 6/POJK.04/2017
          Perlakuan     Akuntansi      atas    Transaksi                   regarding   Accounting    Treatment      for
          Berdasarkan Perjanjian Jual Beli Tenaga                          Transactions Based on Power Purchase
          Listrik (“POJK No. 6”) (lanjutan)                                Agreements (“POJK No. 6”) (continued)

          Jumlah bersih penyesuaian atas aset dan                          The net adjustments on related assets and
          liabilitas terkait sebesar Rp43.428.454 dan                      liabilities amounted to Rp43,428,454 and were
          telah dicatat sebagai penyesuaian saldo laba                     recorded as an adjustment to retained earnings
          pada tanggal 1 Januari 2016, dengan rincian                      on January 1, 2016, the details of which are as
          sebagai berikut:                                                 follows:

                                        1 Januari 2016                        1 Januari 2016
                                           sebelum          Penyesuaian           setelah
                                         penyesuaian/        saldo awal/       penyesuaian/
                                        January 1, 2016      Beginning        January 1, 2016
                                            before            balance              after
                                          adjustment         adjustment         adjustment

          Aset tetap                      1,187,879,590       (72,227,600)      1,115,651,990    Property, plant and equipment
          Aset pajak tangguhan               29,088,271       (14,787,769)         14,300,502               Deferred tax assets

                                          1,216,967,861       (87,015,369)     1,129,952,492
          Liabilitas jangka panjang                                                                        Non-current liabilities
           Utang listrik swasta              7,093,280            755,783          7,849,063     Electricity purchase payable
           Utang sewa                      149,621,763       (128,065,144)        21,556,619                  Lease Liabilities

          Liabilitas jangka pendek                                                                             Current liabilities
           Utang sewa                        6,759,138         (3,313,534)         3,445,604                   Lease liabilities
           Biaya masih harus dibayar        10,627,055         (2,216,084)         8,410,971                Accrued expenses
           Utang listrik swasta                311,196              9,968            321,164     Electricity purchase payable
           Utang usaha                                                                                         Trade payables
              Pihak berelasi                 8,910,438            380,409          9,290,847                 Related parties
              Pihak ketiga                  17,715,563          1,998,142         19,713,705                   Third parties
           Utang lain-lain                  20,188,608              6,637         20,195,245                   Other payables

                                           221,227,041       (130,443,823)        90,783,218

                                                                                                    The effect of POJK No. 6
          Dampak penerapan POJK No. 6                                                               application on beginning
           terhadap saldo laba awal                            43,428,454                                 retained earnings

          Mulai 1 Januari 2020, Grup menerapkan                             Starting January 1, 2020, the Group
          Pernyataan Standar Akuntansi Keuangan                             implemented      Statement     of   Financial
          (“PSAK”) 116, “Sewa”. Standar akuntansi ini                       Accounting     Standards     (“SFAS”)    116,
          menggantikan standar akuntansi berikut:                           “Leases”. This standard replaced the previous
                                                                            accounting standards as follows:
          •    PSAK No. 30: “Sewa”                                          •   SFAS No. 30: “Leases”
          •    ISAK No. 8: “Penentuan apakah Suatu                          •   IFAS No. 8: “Determining Whether an
               Perjanjian Mengandung Suatu Sewa”                                Arrangement Contains a Lease”
          •    ISAK No. 23: “Sewa Operasi-Insentif”                         •   IFAS No. 23: “Operating Leases-
                                                                                Incentives”
          •    ISAK No. 24: “Evaluasi Substansi Beberapa                    •   IFAS No. 24: “Evaluating the Substance
               Transaksi yang Melibatkan Suatu Bentuk                           of Transactions Involving the Legal Form
               Legal Sewa”                                                      of a Lease”
          •    ISAK No. 25: “Hak atas Tanah”                                •   IFAS No. 25: “Land Rights”
Page 18
                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/8 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                         NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                           JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)       (Expressed in millions of Rupiah, unless otherwise stated)

2.   PENERAPAN PRINSIP AKUNTANSI YANG                          2.   IMPLEMENTATION        OF        INDONESIAN
     BERLAKU UMUM DI INDONESIA (“PABU”)                             GENERALLY      ACCEPTED        ACCOUNTING
     (lanjutan)                                                     PRINCIPLES (“GAAP”) (continued)

     a.   Penerapan      Peraturan      Otoritas    Jasa            a.   Implementation   of  Financial     Services
          Keuangan No. 6/POJK.04/2017 tentang                            Authority Regulation No. 6/POJK.04/2017
          Perlakuan     Akuntansi      atas    Transaksi                 regarding   Accounting     Treatment     for
          Berdasarkan Perjanjian Jual Beli Tenaga                        Transactions Based on Power Purchase
          Listrik (“POJK No. 6”) (lanjutan)                              Agreements (“POJK No. 6”) (continued)

          Perjanjian jual beli tenaga listrik yang diikuti               The PPAs entered into by the Group are still
          oleh Grup tetap mengacu pada POJK No. 6                        accounted for under POJK No. 6 because it
          karena peraturan tersebut masih berlaku                        remains valid until the end of the assignment on
          sampai     berakhirnya      penugasan       untuk              acceleration    of     electricity   infrastructure
          percepatan      pembangunan          infrastruktur             development in accordance with Presidential
          ketenagalistrikan    berdasarkan       Peraturan               Regulation.    Therefore,        the    accounting
          Presiden. Dengan demikian, perlakuan                           treatment for PPAs and ESCs with IPPs
          akuntansi untuk PPA dan ESC dengan IPP                         remains the same as before the Group
          masih tetap sama seperti sebelum Grup                          implemented SFAS No. 116, i.e. treated as sale
          menerapkan PSAK No. 116, yaitu diperlakukan                    and purchase transactions; hence, excluded
          sebagai transaksi jual beli dan dikecualikan dari              from the scope of SFAS No. 116.
          ruang lingkup penerapan PSAK No. 116.

     b.   Perubahan pada PSAK dan amendemen yang                    b.   Changes to SFAS and amendments which are
          berlaku efektif untuk tahun buku yang dimulai                  effective for years beginning on or after
          pada atau setelah tanggal 1 Januari 2024                       January 1, 2024

          Penerapan dari amendemen yang berlaku                          The adoption of the following amendments to
          efektif untuk tahun buku yang dimulai pada atau                accounting standards which are effective from
          setelah tanggal 1 Januari 2024 tidak                           January 1, 2024 did not result in substantial
          menyebabkan perubahan signifikan atas                          changes to the Group's accounting policies and
          kebijakan      akuntansi   Grup    dan    tidak                had no material effect on the amounts reported
          memberikan dampak yang material terhadap                       in the consolidated financial statements for the
          jumlah yang dilaporkan di laporan keuangan                     current year:
          konsolidasian pada tahun berjalan:
          • Amendemen PSAK No. 201: “Penyajian                           • Amendment to SFAS No. 201, “Presentation
            Laporan Keuangan – Klasifikasi Liabilitas                      of Financial Statements – Classification of
            sebagai Jangka Pendek atau Jangka                              Liabilities as Current or Non-Current”
            Panjang”
          • Amendemen PSAK No. 201: “Penyajian                           • Amendment to SFAS No. 201, “Presentation
            Laporan Keuangan – Liabilitas Jangka                           of Financial Statements – Long-term
            Panjang dengan Kovenan”                                        Liabilities with Covenants”
          • Amendemen PSAK No. 207: “Laporan Arus                        • Amendment to SFAS No. 207: “Statement of
            Kas” dan PSAK No. 107, “Instrumen                              Cash Flows” and SFAS No. 107, “Financial
            Keuangan: Pengungkapan” – Pengaturan                           Instruments: Disclosure” – Supplier Finance
            Pembiayaan Pemasok                                             Arrangements
          • Amendemen PSAK No. 116: “Sewa –                              • Amendment to SFAS No. 116: “Leases –
            Liabilitas Sewa dalam Jual dan Sewa Balik”                     Lease Liability in a Sale and Leaseback”

          Standar dan amendemen akuntansi baru                           Certain new and amended accounting
          tertentu telah dikeluarkan tetapi tidak wajib                  standards have been published that are not
          diterapkan pada tahun yang berakhir 31                         mandatory for the year ended 31 December
          Desember 2024 dan belum diterapkan secara                      2024 and have not been early adopted by the
          dini oleh Grup adalah sebagai berikut:                         Group are as follows:
Page 19
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                               Lampiran 5/9 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                       NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                              FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                         JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)     (Expressed in millions of Rupiah, unless otherwise stated)

2.   PENERAPAN PRINSIP AKUNTANSI YANG                        2.   IMPLEMENTATION        OF        INDONESIAN
     BERLAKU UMUM DI INDONESIA (“PABU”)                           GENERALLY      ACCEPTED        ACCOUNTING
     (lanjutan)                                                   PRINCIPLES (“GAAP”) (continued)

     b.   Perubahan pada PSAK dan amendemen yang                  b.   Changes to SFAS and amendments which are
          berlaku efektif untuk tahun buku yang dimulai                effective for years beginning on or after
          pada atau setelah tanggal 1 Januari 2024                     January 1, 2024 (continued)
          (lanjutan)

          • PSAK No. 117: “Kontrak Asuransi”                           • SFAS No. 117, “Insurance Contracts”
          • Amendemen PSAK No. 117 Kontrak                             • The amendments to SFAS No. 117,
            Asuransi tentang penerapan awal PSAK 117                     “Insurance Contract” about initial application
            dan PSAK 109 – informasi komparatif;                         of SFAS 117 and SFAS 109 – comparative
                                                                         information;
          • Amendemen PSAK No. 221, “Pengaruh                          • Amendment to SFAS No. 221, “The Effect of
            Perubahan Kurs Valuta Asing – Kekurangan                     Changes in Foreign Exchange Rates – Lack
            Ketertukaran”                                                of Exchangeability”

          Pada tanggal 31 Desember 2024, Grup masih                    As at 31 December 2024, the Group is still
          menilai dampak dari standar dan amendemen                    assessing the impact of the new and amended
          akuntansi baru.                                              accounting standards.


3.   INFORMASI          KEBIJAKAN           AKUNTANSI        3.   MATERIAL            ACCOUNTING              POLICY
     MATERIAL                                                     INFORMATION

     Berikut ini adalah kebijakan akuntansi material yang         Presented below are the material accounting policies
     diterapkan dalam penyusunan laporan keuangan                 adopted in preparing the consolidated financial
     konsolidasian     Grup.     Kebijakan    ini    telah        statements of the Group. These policies have been
     diaplikasikan secara konsisten terhadap semua                consistently applied to all of the years presented,
     tahun yang disajikan, kecuali dinyatakan lain.               unless otherwise stated.

     a.   Pernyataan kepatuhan                                    a.   Statement of compliance

          Sejak 1 Januari 2016, laporan keuangan                       Since January 1, 2016, the consolidated
          konsolidasian telah disusun dan disajikan                    financial statements have been prepared and
          sesuai dengan PABU, yang mencakup sebagai                    presented in accordance with Indonesian
          berikut:                                                     GAAP, which covers the following:
          (a) Standar Akuntansi Keuangan yang                          (a) Financial Accounting Standards issued by
               dikeluarkan oleh DSAK-IAI, yang meliputi                     DSAK-IAI, which cover SFAS and IFAS;
               PSAK dan ISAK;
          (b) Standar Akuntansi Keuangan Syariah                       (b) Syariah Financial Accounting Standards
               yang dikeluarkan oleh Dewan Standar                         issued by the Syariah Accounting
               Akuntansi Syariah - Ikatan Akuntan                          Standards Board - Indonesian Institute of
               Indonesia (“DSAS-IAI”), yang meliputi                       Accountants (“DSAS-IAI”), which cover
               Standar Akuntansi Syariah (“SAS”); dan                      Syariah Accounting Standards (“SAS”);
                                                                           and
          (c) Ketentuan akuntansi keuangan yang                        (c) Applicable Capital Market Regulations as
              ditetapkan oleh OJK, terdiri dari Peraturan                  stated by the FSA, including FSA
              OJK No. VIII.G.7 tentang Pedoman                             Regulation No. VIII.G.7 consisting of
              Penyajian Laporan Keuangan, Keputusan                        Guidance for the Presentation of Financial
              Ketua Badan Pengawas Pasar Modal -                           Statements, Decree of Chairman of the
              Lembaga Keuangan (“Bapepam-LK”) No.                          Capital Market and Financial Institutions
              KEP-347/BL/2012 tentang Penyajian dan                        Supervisory Board (“CM-FISB”) No. KEP-
              Pengungkapan Laporan Keuangan Emiten                         347/BL/2012 regarding Presentation and
              atau Perusahaan Publik, dan Peraturan                        Disclosure of Financial Statements of
              OJK No. 6 POJK.04/2017 tentang                               Listed or Public Companies, and FSA
              Perlakuan Akuntansi atas Transaksi                           Regulation No. 6 POJK.04/2017 regarding
              Berdasarkan Perjanjian Jual Beli Tenaga                      Accounting Treatment for Transactions
              Listrik.                                                     Based on Power Purchase Agreements.
Page 20
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                               Lampiran 5/10 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                               FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                          JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)      (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI       KEBIJAKAN                AKUNTANSI       3.   MATERIAL       ACCOUNTING                     POLICY
     MATERIAL (lanjutan)                                           INFORMATION (continued)

     b.   Dasar penyusunan          laporan    keuangan            b.   Basis of preparation of the consolidated
          konsolidasian                                                 financial statements

          Dasar     penyusunan     laporan    keuangan                  The consolidated financial statements, except
          konsolidasian, kecuali untuk laporan arus kas                 for the consolidated statements of cash flows,
          konsolidasian adalah dasar akrual. Laporan                    have been prepared using the accrual basis of
          keuangan konsolidasian disusun dan disajikan                  accounting. The preparation and presentation
          berdasarkan asumsi kelangsungan usaha dan                     of the consolidated financial statements are
          dengan pengukuran nilai historis, kecuali                     based on the going concern assumption and
          beberapa akun tertentu disusun berdasarkan                    the measurement basis is historical cost,
          pengukuran lain sebagaimana diuraikan dalam                   except for certain accounts that have been
          kebijakan akuntansi masing-masing akun                        measured on the basis described in the related
          tersebut.                                                     accounting policies.

          Penyusunan laporan keuangan konsolidasian                     The preparation of consolidated financial
          berdasarkan Standar Akuntansi Keuangan di                     statements in conformity with Indonesian
          Indonesia mengharuskan penggunaan estimasi                    Financial Accounting Standards requires the use
          dan asumsi akuntansi penting tertentu. Hal                    of certain critical accounting estimates and
          tersebut juga mengharuskan manajemen untuk                    assumptions. It also requires management to
          membuat      pertimbangan       dalam     proses              exercise its judgement in the process of applying
          penerapan kebijakan akuntansi Grup. Area yang                 the Group’s accounting policies. The areas
          kompleks      atau     memerlukan         tingkat             involving a higher degree of judgement or
          pertimbangan yang lebih tinggi atau area di mana              complexity, or areas where assumptions and
          asumsi dan estimasi dapat berdampak signifikan                estimates are significant to the consolidated
          terhadap laporan keuangan konsolidasian                       financial statements are disclosed in Note 4.
          diungkapkan di Catatan 4.

     c.   Prinsip-prinsip konsolidasian                            c.   Principles of consolidation

          i. Entitas anak                                               i.   Subsidiaries

             i.1. Konsolidasi                                                i.1. Consolidation

                  Entitas anak merupakan semua entitas                          Subsidiaries are all entities (including
                  (termasuk entitas bertujuan khusus), di                       structured entities) over which the
                  mana Grup memiliki pengendalian.                              Group has control. The Group controls
                  Grup mengendalikan suatu entitas                              an entity when the Group is exposed to,
                  ketika Grup memiliki hak atas imbal                           or has rights to, variable returns from its
                  hasil variabel dari keterlibatannya                           involvement with the entity and has the
                  dengan suatu entitas dan memiliki                             ability to affect those returns through its
                  kemampuan untuk mempengaruhi                                  power over the entity.
                  imbal     hasil    tersebut    melalui
                  kekuasaannya atas entitas tersebut.

                  Entitas anak dikonsolidasi sejak                              Subsidiaries are consolidated from the
                  tanggal pengendalian beralih kepada                           date on which control is transferred to
                  Grup dan tidak lagi dikonsolidasi sejak                       the Group and are de-consolidated
                  tanggal hilangnya pengendalian.                               from the date on which that control
                                                                                ceases.
Page 21
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                               Lampiran 5/11 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                               FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                          JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)      (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI       KEBIJAKAN               AKUNTANSI        3.   MATERIAL       ACCOUNTING                      POLICY
     MATERIAL (lanjutan)                                           INFORMATION (continued)

     c.   Prinsip-prinsip konsolidasian (lanjutan)                 c.   Principles of consolidation (continued)

          i.   Entitas anak (lanjutan)                                  i.   Subsidiaries (continued)

               i.1. Konsolidasi (lanjutan)                                   i.1. Consolidation (continued)

                   Saldo, transaksi, penghasilan, dan                           Intragroup balances, transactions,
                   beban      intra    kelompok     usaha                       income and expenses are eliminated.
                   dieliminasi. Keuntungan dan kerugian                         Profits and losses resulting from
                   hasil dari transaksi intra kelompok                          intragroup transactions that are
                   usaha yang diakui dalam aset juga                            recognised in assets are also
                   dieliminasi. Kebijakan akuntansi entitas                     eliminated. The accounting policies of
                   anak telah diubah seperlunya untuk                           subsidiaries have been amended
                   memastikan konsistensi penerapan                             where necessary to ensure consistency
                   kebijakan oleh Grup.                                         with the policies adopted by the Group.

               i.2. Akuisisi                                                 i.2. Acquisition

                  Grup menerapkan metode akuisisi untuk                         The Group applies the acquisition
                  mencatat setiap kombinasi bisnis.                             method to account for business
                  Imbalan       yang     dialihkan   untuk                      combinations.       The       consideration
                  mengakuisisi entitas anak adalah nilai                        transferred for the acquisition of a
                  wajar seluruh aset yang dialihkan,                            subsidiary is the fair value of the assets
                  liabilitas yang diakui oleh pihak                             transferred, the liabilities incurred to the
                  pengakuisisi        kepada        pemilik                     former owners of the acquiree and the
                  sebelumnya dari entitas yang diakuisisi                       equity interests issued by the Group.
                  dan       kepentingan     ekuitas   yang                      The consideration transferred includes
                  diterbitkan oleh Grup. Imbalan yang                           the fair value of any asset or liability
                  dialihkan termasuk nilai wajar setiap                         resulting      from        a     contingent
                  aset dan liabilitas yang dihasilkan dari                      consideration       arrangement.        The
                  suatu kesepakatan imbalan kontingensi.                        identifiable assets acquired, liabilities
                  Aset teridentifikasi, liabilitas dan                          and contingent liabilities assumed in a
                  liabilitas kontingensi yang diambil alih,                     business combination are measured
                  yang diperoleh dalam kombinasi bisnis                         initially at their fair values as at the
                  diukur pada awalnya sebesar nilai wajar                       acquisition date.
                  pada tanggal akuisisi.

                  Grup mengakui kepentingan non-                                The Group recognises any non-
                  pengendali pada pihak yang diakuisisi                         controlling interest in the acquiree on an
                  baik sebesar nilai wajar atau sebesar                         acquisition-by-acquisition basis, either
                  bagian proporsional kepentingan non-                          at fair value or at the non-controlling
                  pengendali atas aset neto teridentifikasi                     interest’s proportionate share of the
                  pihak yang diakuisisi. Kepentingan non-                       acquiree’s identifiable net assets. Non-
                  pengendali disajikan di ekuitas dalam                         controlling interests are reported as
                  laporan posisi keuangan konsolidasian,                        equity in the consolidated statements of
                  terpisah dari ekuitas pemilik entitas                         financial position, separate from the
                  induk.                                                        owner of the parent entity.

                  Biaya terkait akuisisi dibebankan pada                        Acquisition-related costs are expensed
                  saat terjadinya.                                              as incurred.
Page 22
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                 Lampiran 5/12 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                          NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                 FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                            JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)        (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI       KEBIJAKAN                AKUNTANSI         3.   MATERIAL       ACCOUNTING                       POLICY
     MATERIAL (lanjutan)                                             INFORMATION (continued)

     c.   Prinsip-prinsip konsolidasian (lanjutan)                   c.   Principles of consolidation (continued)

          i.   Entitas anak (lanjutan)                                    i.   Subsidiaries (continued)

               i.2. Akuisisi (lanjutan)                                        i.2. Acquisition (continued)

                  Jika kombinasi bisnis diperoleh secara                          If the business combination is achieved
                  bertahap,     Grup    akan     mengukur                         in stages, the Group will remeasure its
                  kepentingan ekuitas yang sebelumnya                             previously held equity interest in the
                  dimiliki pada pihak yang diakuisisi                             acquiree at its fair value at its acquisition
                  sebesar nilai wajar pada tanggal akuisisi                       date and recognise the resulting gain or
                  dan     mengakui     keuntungan       atau                      loss, if any, in profit or loss. Any
                  kerugian yang dihasilkan, jika ada,                             contingent       consideration       to    be
                  dalam laba rugi. Imbalan kontingensi                            transferred by the Group is recognised
                  yang masih harus dialihkan oleh Grup                            at its fair value as at the acquisition date.
                  diakui sebesar nilai wajar pada tanggal                         Subsequent changes to the fair value of
                  akuisisi. Perubahan selanjutnya atas                            the contingent consideration that is
                  nilai wajar imbalan kontingensi yang                            deemed to be an asset or a liability are
                  diakui sebagai aset atau liabilitas dan                         recognised in profit or loss. A contingent
                  dicatat dalam laba rugi. Imbalan                                consideration that is classified as equity
                  kontingensi     yang      diklasifikasikan                      is not remeasured and its subsequent
                  sebagai ekuitas tidak diukur kembali dan                        settlement is accounted for within
                  penyelesaian selanjutnya diperhitungkan                         equity.
                  dalam ekuitas.

                  Selisih lebih antara imbalan yang                               The excess of the consideration
                  dialihkan, jumlah setiap kepentingan                            transferred, the amount of any non-
                  non-pengendali dalam pihak yang                                 controlling interests in the acquiree and
                  diakuisisi, dan nilai wajar pada tanggal                        the acquisition-date fair value of any
                  akuisisi dari kepemilikan ekuitas yang                          previous equity interest in the acquiree
                  sebelumnya       dimiliki   oleh    pihak                       over the fair value of the Group’s share
                  pengakuisisi pada pihak yang diakuisisi,                        of the identifiable net assets acquired
                  dibandingkan dengan nilai wajar bagian                          are recorded as goodwill. If these
                  Grup atas aset bersih teridentifikasi                           amounts are less than the fair value of
                  yang diakuisisi, dicatat sebagai goodwill.                      the net identifiable assets of the
                  Jika jumlah tersebut lebih kecil dari nilai                     subsidiary       acquired     and      the
                  wajar atas aset bersih teridentifikasi                          measurement of all amounts has been
                  entitas anak yang diakuisisi dan                                reviewed, in the case of a bargain
                  pengukuran atas seluruh jumlah                                  purchase, the difference is recognised
                  tersebut telah ditelaah, dalam hal                              directly in profit or loss.
                  pembelian dengan diskon, selisih
                  tersebut diakui secara langsung dalam
                  laba rugi.

          ii. Perubahan kepemilikan atas entitas anak                     ii. Changes in ownership interest                 in
              tanpa kehilangan pengendalian                                   subsidiaries without loss of control

               Transaksi dengan kepentingan non-                               Transactions with non-controlling interests
               pengendali yang tidak mengakibatkan                             that do not result in a loss of control are
               hilangnya pengendalian dicatat sebagai                          accounted for as equity transactions. The
               transaksi ekuitas. Selisih antara nilai wajar                   difference between the fair value of any
               imbalan yang dibayarkan dan bagiannya                           consideration paid and the relevant share
               atas jumlah tercatat aset neto yang                             acquired of the carrying amount of net
               diperoleh     dicatat     dalam      ekuitas.                   assets of the subsidiary is recorded in
               Keuntungan atau kerugian atas pelepasan                         equity. Gains or losses on disposals to non-
               kepada kepentingan non-pengendali juga                          controlling interests are also recorded in
               dicatat pada ekuitas.                                           equity.
Page 23
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/13 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                       NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                              FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                         JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)     (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI       KEBIJAKAN              AKUNTANSI        3.   MATERIAL       ACCOUNTING                    POLICY
     MATERIAL (lanjutan)                                          INFORMATION (continued)

     c.   Prinsip-prinsip konsolidasian (lanjutan)                c.   Principles of consolidation (continued)

          iii. Pelepasan entitas anak                                  iii. Disposal of subsidiaries

             Ketika Grup kehilangan pengendalian atas                     When the Group loses control of a
             entitas     anak,    Grup    menghentikan                    subsidiary, the Group derecognises the
             pengakuan aset (termasuk setiap goodwill)                    assets (including any goodwill) and
             dan liabilitas entitas anak pada nilai                       liabilities of the subsidiary at their carrying
             tercatatnya ketika pengendalian hilang.                      amounts as at the date on which control is
             Jumlah yang sebelumnya diakui dalam                          lost. Amounts previously recognised in
             penghasilan komprehensif lain juga                           other comprehensive income are also
             direklasifikasi ke laba rugi atau dialihkan                  reclassified to profit or loss, or transferred
             secara langsung ke saldo laba jika                           directly to retained earnings if required
             disyaratkan oleh PSAK lain.                                  under other SFAS.

             Sisa investasi pada entitas anak terdahulu                   Any investment retained in the former
             diakui sebesar nilai wajarnya. Setiap                        subsidiary is recognised at its fair value.
             perbedaan antara nilai tercatat sisa                         The difference between the carrying
             investasi    pada    tanggal     hilangnya                   amount of the investment retained on the
             pengendalian dan nilai wajarnya diakui                       date when the control is lost and its fair
             dalam laba rugi.                                             value is recognised in profit or loss.

          iv. Akuntansi atas entitas asosiasi dan                      iv. Accounting for associates and joint
              ventura bersama                                              ventures

             Entitas asosiasi adalah suatu entitas                        An associate is an entity over which the
             dimana Grup mempunyai pengaruh                               Group has significant influence, but not
             signifikan, tetapi tidak mengendalikan, dan                  control, and is generally accompanied by a
             biasanya Grup memiliki 20% atau lebih hak                    shareholding giving rise to voting rights of
             suara, tetapi tidak melebihi 50% hak suara.                  20% or greater but not exceeding 50%.
             Investasi pada entitas asosiasi dicatat pada                 Investment in associates is accounted for in
             laporan        keuangan        konsolidasian                 the consolidated financial statements using
             menggunakan metode ekuitas dikurangi                         the equity method less impairment losses,
             kerugian penurunan nilai, jika ada.                          if any.

             Ventura bersama merupakan pengaturan                         A joint venture is a joint arrangement in
             bersama antara beberapa pihak yang                           which the parties that share joint control
             melakukan kesepakatan pengendalian                           have rights to the net assets of the
             bersama yang memiliki hak atas aset neto                     arrangement. Joint ventures are accounted
             pengaturan tersebut. Ventura bersama ini                     for using the equity method less impairment
             menggunakan metode ekuitas dikurangi                         losses, if any.
             kerugian penurunan nilai, jika ada.

             - Akuisisi                                                   - Acquisitions

              Investasi pada entitas asosiasi atau                          Investment in an associate or a joint
              ventura bersama pada awalnya diakui                           venture is initially recognised at cost. The
              sebesar biaya perolehan. Biaya perolehan                      cost of an acquisition is measured at the
              diukur berdasarkan nilai wajar aset yang                      fair value of the assets transferred, equity
              diserahkan, instrumen ekuitas yang                            instruments issued or liabilities incurred or
              diterbitkan atau liabilitas yang timbul atau                  assumed as at the date of exchange, plus
              diambil alih pada tanggal akuisisi,                           costs directly attributable to the
              ditambah biaya yang berhubungan                               acquisition.
              langsung dengan akuisisi.
Page 24
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/14 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                             FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                        JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)    (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI       KEBIJAKAN              AKUNTANSI       3.   MATERIAL       ACCOUNTING                   POLICY
     MATERIAL (lanjutan)                                         INFORMATION (continued)

     c.   Prinsip-prinsip konsolidasian (lanjutan)               c.   Principles of consolidation (continued)

          iv. Akuntansi atas entitas asosiasi dan                     iv. Accounting for associates and joint
              ventura bersama (lanjutan)                                  ventures (continued)

             - Akuisisi (lanjutan)                                       - Acquisitions (continued)

              Goodwill pada akuisisi entitas asosiasi                      Goodwill on the acquisition of an
              atau ventura bersama merupakan selisih                       associate or a joint venture represents the
              lebih yang terkait dengan biaya perolehan                    excess of the cost of acquisition of the
              investasi pada entitas asosiasi atau                         associate or joint venture over the
              ventura bersama dengan bagian Grup                           Group’s share of the fair value of the
              atas nilai wajar neto aset teridentifikasi                   identifiable net assets of the associate or
              dari entitas asosiasi atau ventura bersama                   joint venture and is included in the
              dan dimasukkan dalam jumlah tercatat                         carrying amount of the investment.
              investasi.

             - Metode ekuitas                                            - Equity method of accounting

              Dalam menerapkan metode ekuitas,                             In applying the equity method of
              bagian Grup atas laba rugi entitas asosiasi                  accounting, the Group’s share of its
              atau ventura Bersama setelah perolehan                       associate’s or joint venture’s post-
              diakui dalam laba rugi, dan bagian Grup                      acquisition profit or loss is recognised in
              atas penghasilan komprehensif lain                           profit or loss and its share of post-
              setelah tanggal perolehan diakui dalam                       acquisition other comprehensive income
              penghasilan komprehensif lain.                               is recognised in other comprehensive
                                                                           income.

              Perubahan dan penerimaan distribusi dari                     These post-acquisition movements and
              entitas asosiasi atau ventura bersama                        distributions received from an associate
              setelah tanggal perolehan disesuaikan                        or a joint venture are adjusted against the
              terhadap nilai tercatat investasi.                           carrying amounts of the investment.

              Jika bagian Grup atas rugi entitas asosiasi                  When the Group’s share of the losses of
              atau ventura bersama sama dengan atau                        an associate or a joint venture equals or
              melebihi kepentingannya pada entitas                         exceeds its interest in the associate or
              asosiasi atau ventura bersama, termasuk                      joint venture, including any other
              piutang tidak lancar tanpa jaminan, maka                     unsecured non-current receivables, the
              Grup       menghentikan         pengakuan                    Group does not recognise further losses,
              bagiannya atas rugi lebih lanjut, kecuali                    unless it has obligations to make or has
              Grup memiliki kewajiban untuk melakukan                      made payments on behalf of the
              pembayaran atau telah melakukan                              associate or joint venture.
              pembayaran atas nama entitas asosiasi
              atau ventura bersama.

              Keuntungan yang belum direalisasi atas                       Unrealised gains on transactions between
              transaksi antara Grup dengan entitas                         the Group and its associates or joint
              asosiasi atau ventura bersama dieliminasi                    ventures are eliminated to the extent of
              sebesar bagian Grup dalam entitas                            the Group’s interest in the associate or
              asosiasi atau ventura bersama tersebut.                      joint venture. Unrealised losses are also
              Kerugian yang belum direalisasi juga                         eliminated     unless   the   transaction
              dieliminasi kecuali transaksi tersebut                       provides evidence of the impairment of
              memberikan bukti penurunan nilai atas                        the asset being transferred. The
              aset yang ditransfer. Kebijakan akuntansi                    accounting policies of the associate or
              entitas asosiasi atau ventura bersama                        joint venture have been changed where
              akan disesuaikan, apabila diperlukan,                        necessary to ensure consistency with the
              agar    konsisten     dengan    kebijakan                    accounting policies adopted by the
              akuntansi Grup.                                              Group.
Page 25
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/15 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                             FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                        JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)    (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI       KEBIJAKAN              AKUNTANSI       3.   MATERIAL       ACCOUNTING                   POLICY
     MATERIAL (lanjutan)                                         INFORMATION (continued)

     c.   Prinsip-prinsip konsolidasian (lanjutan)               c.   Principles of consolidation (continued)

          iv. Akuntansi atas entitas asosiasi dan                     iv. Accounting for associates and joint
              ventura bersama (lanjutan)                                  ventures (continued)

             - Metode ekuitas (lanjutan)                                 - Equity     method       of     accounting
                                                                           (continued)

              Dividen yang akan diterima dari entitas                      Dividend receivables from an associate or
              asosiasi atau ventura bersama diakui                         a joint venture are recognised as
              sebagai pengurang jumlah tercatat                            reductions in the carrying amount of the
              investasi.                                                   investment.

              Pada setiap tanggal pelaporan, Grup                          At each reporting date, the Group
              menentukan apakah terdapat bukti                             determines whether there is any objective
              objektif bahwa telah terjadi penurunan                       evidence that the investment in an
              nilai atas investasi pada entitas asosiasi                   associate or joint venture is impaired. If
              atau ventura bersama. Jika bukti tersebut                    any such evidence exists, the Group
              ada, maka Grup menghitung besarnya                           calculates the amount of impairment as
              penurunan nilai sebagai selisih antara                       the difference between the recoverable
              jumlah yang terpulihkan dan nilai tercatat                   amount of the associate or the joint
              atas investasi pada entitas asosiasi atau                    venture and its carrying amount and
              ventura bersama dan mengakui selisih                         recognises the amount in profit or loss.
              tersebut pada laba rugi.

             - Pelepasan                                                 - Disposals

              Investasi pada entitas asosiasi atau                         An investment in an associate or a joint
              ventura         bersama          dihentikan                  venture is derecognised when the Group
              pengakuannya apabila Grup tidak lagi                         loses significant influence and any
              memiliki pengaruh signifikan dan Grup                        retained equity interest in the entity is
              mengukur investasi yang tersisa sebesar                      remeasured at its fair value. The
              nilai wajar. Selisih antara jumlah tercatat                  difference between the carrying amount
              investasi yang tersisa pada tanggal                          of the retained interest at the date when
              hilangnya pengaruh signifikan dan nilai                      significant influence is lost and its fair
              wajarnya diakui dalam laba rugi.                             value is recognised in profit or loss.

              Keuntungan dan kerugian yang timbul dari                     Gains and losses arising from partial
              pelepasan sebagian atau dilusi yang                          disposal or dilution of an investment in an
              timbul pada investasi pada entitas                           associate and a joint venture in which
              asosiasi dan ventura bersama dimana                          significant influence is retained are
              pengaruh signifikan masih dipertahankan                      recognised in profit or loss, and only a
              diakui dalam laba rugi dan hanya suatu                       proportionate share of the amount
              bagian proporsional atas jumlah yang                         previously      recognised      in    other
              telah      diakui     sebelumnya   pada                      comprehensive income is reclassified to
              penghasilan komprehensif lain yang                           profit or loss where appropriate.
              direklasifikasi ke laba rugi.
Page 26
                     PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                  DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/16 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                         NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                           JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)       (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI       KEBIJAKAN              AKUNTANSI         3.     MATERIAL       ACCOUNTING                          POLICY
     MATERIAL (lanjutan)                                             INFORMATION (continued)

     d.   Penjabaran mata uang asing                                 d.     Foreign currency translation

          i.    Mata uang fungsional dan penyajian                         i.       Functional and presentation currency

                Akun-akun yang disertakan dalam laporan                             Items included in the financial statements
                keuangan setiap entitas anggota Grup                                of each of the Group’s entities are
                diukur menggunakan mata uang dari                                   measured using the currency of the
                lingkungan ekonomi utama dimana entitas                             primary economic environment in which
                tersebut     beroperasi    (“mata    uang                           the relevant entity operates (the “functional
                fungsional”).     Laporan        keuangan                           currency”). The consolidated financial
                konsolidasian disajikan dalam Rp, yang                              statements are presented in Rp, which is
                merupakan      mata     uang    fungsional                          the Company’s functional currency and the
                Perusahaan dan penyajian Grup.                                      Group’s presentation currency.

          ii.   Transaksi dan saldo                                         ii.     Transactions and balances

                Transaksi dalam mata uang asing                                     Foreign      currency     transactions  are
                dijabarkan menjadi mata uang fungsional                             translated into the functional currency
                menggunakan kurs yang berlaku pada                                  using the exchange rates prevailing as at
                tanggal transaksi. Pada tanggal pelaporan,                          the date of the transactions. As at the
                setiap aset dan liabilitas moneter dalam                            reporting date, monetary assets and
                mata uang asing disesuaikan untuk                                   liabilities denominated in foreign currency
                mencerminkan kurs yang berlaku pada                                 are adjusted to reflect the exchange rates
                tanggal     tersebut.   Keuntungan    dan                           prevailing at this date. Foreign exchange
                kerugian selisih kurs yang timbul dari                              gains and losses resulting from the
                penyelesaian transaksi dalam mata uang                              settlement of such transactions and from
                asing dan dari penjabaran aset dan                                  the translation at year-end exchange rates
                liabilitas moneter dalam mata uang asing                            of monetary assets and liabilities
                menggunakan kurs yang berlaku pada                                  denominated in foreign currencies are
                akhir tahun pelaporan diakui dalam laba                             recognised in profit or loss.
                rugi.

                Kurs yang digunakan pada tanggal laporan                            As at the consolidated statement of
                posisi keuangan konsolidasian, berdasarkan                          financial position dates, the exchange rates
                kurs penutup yang berlaku pada tanggal                              used, based on the exchange rates
                laporan posisi keuangan konsolidasian yang                          prevailing at the date of the consolidated
                diterbitkan Bank Indonesia, adalah sebagai                          statement of financial position published by
                berikut:                                                            Bank Indonesia were as follows:


                                                    30 Juni/              31 Desember/
                                                   June 30,               December 31,
                                                     2025                     2024
                                                  Kurs tengah/            Kurs tengah/
                                                  Middle rate*)           Middle rate*)

                Yen Jepang (JPY)                               113                       103                    Japan Yen (JPY)
                Ringgit Malaysia (MYR)                       3,851                     3,612             Malaysian Ringgit (MYR)
                Dolar AS (USD)                              16,231                    16,157                   US Dollars (USD)
                Euro (EUR)                                  19,032                    16,823                         Euro (EUR)
                Franc Swiss (CHF)                           20,312                    17,884                  Swiss Franc (CHF)
                Dolar Kuwait (KWD)                          53,097                    52,440               Kuwait Dollars (KWD)


                *)   dalam jumlah penuh                                   *)      in full amount
Page 27
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                               Lampiran 5/17 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                          NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                 FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                            JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)        (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI       KEBIJAKAN               AKUNTANSI        3.      MATERIAL       ACCOUNTING                      POLICY
     MATERIAL (lanjutan)                                              INFORMATION (continued)

     d.   Penjabaran mata uang asing (lanjutan)                       d.   Foreign currency translation (continued)

          iii. Entitas dalam Grup                                          iii. Group companies

              Hasil usaha operasi dan posisi keuangan                            The results of the operations and financial
              dari seluruh entitas anak Grup (tidak ada                          position of all of the Group’s subsidiaries
              yang mata uang fungsionalnya mata uang                             (none of which has the currency of a
              dari suatu ekonomi hiperinflasi) yang                              hyperinflationary economy) that have a
              memiliki mata uang fungsional yang                                 functional currency different from the
              berbeda dengan mata uang penyajian                                 Company’s presentation currency are
              Perusahaan, ditranslasikan dalam mata                              translated into the Group’s presentation
              uang penyajian Grup sebagai berikut:                               currency as follows:

              (a) Aset dan liabilitas yang disajikan pada                        (a) The assets and liabilities presented in
                  laporan          posisi       keuangan                             the consolidated         statement     of
                  konsolidasian, dijabarkan pada kurs                                financial position are translated at the
                  penutup tanggal laporan posisi                                     closing rate at the date of the
                  keuangan konsolidasian tersebut;                                   consolidated statement of financial
                                                                                     position;

              (b) Penghasilan dan beban untuk setiap                             (b) The income and expenses for each
                  laba rugi dijabarkan menggunakan                                   item of profit or loss are translated at
                  kurs rata-rata (kecuali jika rata-rata                             the average exchange rates (unless
                  tersebut bukan perkiraan wajar efek                                this average is not a reasonable
                  kumulatif dari kurs yang berlaku pada                              approximation of the cumulative effect
                  tanggal transaksi, maka penghasilan                                of the rates prevailing on the
                  dan beban dijabarkan menggunakan                                   transaction dates, in which case the
                  kurs tanggal transaksi); dan                                       income and expenses are translated
                                                                                     at the rates in force on the dates of the
                                                                                     transactions); and

                                                      30 Juni/             31 Desember/
                                                      June 30,             December 31,
                                                        2025                   2024
                                                    Kurs rata-rata/        Kurs rata-rata/
                                                    Average rate*)         Average rate*)

                  Dolar AS (USD)                        16,428                   15,850                       US Dollars (USD)

                   *)   dalam jumlah penuh                                             *)    in full amount

              (c) Seluruh selisih kurs yang timbul diakui                        (c) All of the resulting exchange
                  dalam penghasilan komprehensif lain.                               differences are recognised in other
                                                                                     comprehensive income.

     e.   Transaksi-transaksi dengan pihak berelasi                   e.   Transactions with related parties

          Grup melakukan transaksi dengan pihak-pihak                      The Group has transactions with related parties
          berelasi sesuai yang didefinisikan oleh PSAK                     as defined under SFAS No. 224: “Related Party
          No. 224: “Pengungkapan Pihak-Pihak Berelasi”                     Disclosures” and OJK Regulation No. VIII.G.7:
          dan Peraturan OJK No. VIII.G.7:
          (a) Orang atau anggota keluarga dekatnya                         (a)    A person or a close member of that
              mempunyai relasi dengan entitas pelapor                             person's family is related to a reporting
              jika orang tersebut:                                                entity if that person:
              (i) Memiliki        pengendalian        atau                        (i) Has control or joint control over the
                    pengendalian bersama atas entitas                                  reporting entity;
                    pelapor;
              (ii) Memiliki pengaruh signifikan atas                              (ii) Has significant influence over the
                    entitas pelapor; atau                                               reporting entity; or
              (iii) Merupakan personil manajemen kunci                            (iii) Is a member of the key management
                    entitas pelapor atau entitas induk dari                             personnel of the reporting entity or of
                    entitas pelapor.                                                    a parent of the reporting entity.
Page 28
                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                 Lampiran 5/18 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                           NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                  FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                             JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)         (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI       KEBIJAKAN                 AKUNTANSI         3.   MATERIAL       ACCOUNTING                       POLICY
     MATERIAL (lanjutan)                                              INFORMATION (continued)

     e.   Transaksi-transaksi dengan pihak berelasi                   e.   Transactions with related parties (continued)
          (lanjutan)

          (b) Suatu entitas berelasi dengan entitas                        (b)   An entity is related to a reporting entity if
              pelapor jika memenuhi salah satu hal                               any of the following conditions apply:
              berikut:
              (i) Entitas dan entitas pelapor adalah                             (i)  The entity and the reporting entity are
                     anggota dari kelompok usaha yang                                 members of the same group (which
                     sama (artinya entitas induk, entitas                             means that each parent, subsidiary
                     anak dan entitas anak berikutnya                                 and fellow subsidiary is related to
                     saling berelasi dengan entitas lain);                            each other);
              (ii) Satu entitas adalah entitas asosiasi                          (ii) One entity is an associate or joint
                     atau ventura bersama dari entitas lain                           venture of the other entity (or an
                     (atau entitas asosiasi atau ventura                              associate or joint venture of a
                     bersama yang merupakan anggota                                   member of a group of which the other
                     suatu kelompok usaha, yang mana                                  entity is a member);
                     entitas     lain    tersebut      adalah
                     anggotanya);
              (iii) Kedua entitas tersebut adalah ventura                        (iii) Both entities are joint ventures of the
                     bersama dari pihak ketiga yang sama;                              same third party;
              (iv) Satu entitas adalah ventura bersama                           (iv) One entity is a joint venture of a third
                     dari entitas ketiga dan entitas yang                              entity and the other entity is an
                     lain adalah entitas asosiasi dari entitas                         associate of the third entity;
                     ketiga;
              (v) Entitas tersebut adalah suatu program                          (v) The entity is a post-employment
                     imbalan pascakerja untuk imbalan                                 benefit plan for the benefit of the
                     kerja dari salah satu entitas pelapor                            employees of either the reporting
                     atau entitas yang terkait dengan                                 entity or an entity related to the
                     entitas pelapor. Jika entitas pelapor                            reporting entity. If the reporting entity
                     adalah entitas yang menyelenggarakan                             is itself such a plan, the sponsoring
                     program tersebut, maka entitas                                   employers are also related to the
                     sponsor juga berelasi dengan entitas                             reporting entity;
                     pelapor;
              (vi) Entitas yang dikendalikan atau                                (vi) The entity is controlled or jointly
                     dikendalikan bersama oleh orang                                    controlled by a person identified in
                     yang diidentifikasi dalam huruf (a);                               (a);
              (vii) Orang yang diidentifikasi dalam huruf                        (vii) A person identified in (a) (i) has
                     (a) (i) memiliki pengaruh signifikan                               significant influence over the entity or
                     atas entitas atau personil manajemen                               is a member of the key management
                     kunci entitas (atau entitas induk dari                             personnel of the entity (or of a parent
                     entitas); atau                                                     of the entity); or
              (viii) Entitas, atau setiap anggota dari                           (viii) The entity, or any member of the
                     kelompok yang menjadi bagiannya,                                   group of which it is a part, provides
                     memberikan jasa personil manajemen                                 key management personnel services
                     kunci kepada entitas pelapor atau                                  to the reporting entity or to the parent
                     kepada entitas induk dari entitas                                  of the reporting entity.
                     pelapor.

          Entitas yang berelasi dengan Pemerintah                           A Government-related entity is an entity that is
          adalah entitas yang dikendalikan, dikendalikan                    controlled, jointly controlled or significantly
          bersama, atau dipengaruhi oleh Pemerintah.                        influenced by the Government. Government
          Pemerintah mengacu kepada Pemerintah                              refers to the Government of the Republic of
          Indonesia, instansi Pemerintah dan badan yang                     Indonesia, Government agencies and similar
          serupa     baik   lokal,   nasional   maupun                      bodies whether local, national or international.
          internasional.
Page 29
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/19 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                       NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                              FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                         JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)     (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI       KEBIJAKAN              AKUNTANSI        3.   MATERIAL       ACCOUNTING                     POLICY
     MATERIAL (lanjutan)                                          INFORMATION (continued)

     e.   Transaksi-transaksi dengan pihak berelasi               e.   Transactions with related parties (continued)
          (lanjutan)

          Entitas yang berelasi dengan Pemerintah                      Government-related entities include entities
          termasuk entitas yang dikendalikan atau                      which are controlled or significantly influenced
          dipengaruhi secara signifikan oleh Kementerian               by the Ministry of Finance or Local
          Keuangan atau Pemerintah Daerah yang                         Governments being the shareholders of the
          merupakan pemegang saham entitas, atau                       entity or an entity controlled by the Government
          entitas yang dikendalikan oleh Pemerintah                    of the Republic of Indonesia, represented by
          Republik Indonesia melalui Kementerian                       the Ministry of SOEs as the shareholder’s
          BUMN sebagai kuasa pemegang saham.                           representative.

          Seluruh transaksi dan saldo yang signifikan                  All significant transactions and balances with
          dengan pihak berelasi diungkapkan dalam                      related parties are disclosed in the relevant
          Catatan yang relevan.                                        Notes.

     f.   Aset keuangan                                           f.   Financial assets

          i.   Klasifikasi, pengakuan dan pengukuran                   i.   Classification,       recognition        and
                                                                            measurement

               Grup mengklasifikasikan aset keuangannya                     The Group classifies its financial assets in
               dalam kategori pengukuran berikut:                           the following measurement categories:
               •   aset keuangan yang diukur pada nilai                     •    financial assets measured at fair value
                   wajar melalui laba rugi atau melalui                          either through profit or loss (“FVTPL”)
                   penghasilan komprehensif lain; dan                            or through other comprehensive
                                                                                 income (“FVOCI”); and
               •    aset keuangan yang diukur pada                          •    those to be measured at amortised
                    biaya perolehan diamortisasi.                                cost.

               Klasifikasi tersebut tergantung pada model                   The classification depends on the Group’s
               bisnis Grup dan persyaratan kontraktual                      business model and the contractual terms
               arus kas - apakah penentuan arus kasnya                      of the cash flows of the cash flows when
               semata dari pembayaran pokok dan                             determining whether their cash flows are
               bunga.                                                       solely payments of principal and interest
                                                                            (“SPPI”).

               Untuk aset yang diukur pada nilai wajar,                     For assets measured at fair value, gains
               keuntungan dan kerugian akan dicatat                         and losses will either be recorded in profit
               dalam laporan laba rugi atau penghasilan                     or loss or other comprehensive income.
               komprehensif lain. Untuk investasi pada                      For investments in debt instruments, this
               instrumen utang, hal ini akan bergantung                     will depend on the business model in which
               pada model bisnis dimana investasi                           the investment is held. For investments in
               tersebut diadakan. Untuk investasi pada                      equity instruments that are not held for
               instrumen ekuitas yang tidak dimiliki untuk                  trading, this will depend on whether the
               diperdagangkan, hal ini akan tergantung                      Group has made an irrevocable election at
               pada apakah Grup telah memilih tidak                         the time of initial recognition to account for
               dapat dibatalkan pada saat pengakuan                         the equity investment at fair value through
               awal untuk mencatat investasi ekuitas                        other comprehensive income.
               pada nilai wajar melalui penghasilan
               komprehensif lain.

               Grup mereklasifikasi investasi utang jika                    The Group reclassifies debt investments
               dan hanya jika model bisnis untuk                            when and only when its business model for
               mengelola aset tersebut berubah.                             managing such assets changes.
Page 30
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/20 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                             FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                        JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)    (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI       KEBIJAKAN              AKUNTANSI       3.   MATERIAL       ACCOUNTING                       POLICY
     MATERIAL (lanjutan)                                         INFORMATION (continued)

     f.   Aset keuangan (lanjutan)                               f.   Financial assets (continued)

          i.   Klasifikasi, pengakuan dan pengukuran                  i.   Classification,   recognition              and
               (lanjutan)                                                  measurement (continued)

               Pada pengakuan awal, Grup mengukur                          At initial recognition, the Group measures
               aset keuangan pada nilai wajarnya                           a financial asset at its fair value plus, in the
               ditambah, dalam hal aset keuangan tidak                     case of a financial asset not at fair value
               diukur pada nilai wajar melalui laba rugi,                  through profit or loss, transaction costs that
               biaya transaksi yang dapat diatribusikan                    are directly attributable to the acquisition of
               secara langsung dengan perolehan aset                       the financial asset. Transaction costs of
               keuangan. Biaya transaksi dari aset                         financial assets carried at fair value
               keuangan yang dicatat pada nilai wajar                      through profit or loss are expensed in profit
               melalui laba rugi dibebankan pada laba                      or loss.
               rugi.

               Aset keuangan dengan derivatif melekat                      Financial    assets    with     embedded
               dipertimbangkan secara keseluruhan saat                     derivatives are considered in their entirety
               menentukan apakah arus kasnya hanya                         when determining whether their cash flows
               merupakan pembayaran pokok dan bunga.                       are SPPI.

               Instrumen utang                                             Debt instruments

               Pengukuran selanjutnya instrumen utang                      Subsequent      measurement    of    debt
               bergantung pada model bisnis Grup dalam                     instruments depends on the Group’s
               mengelola aset dan karakteristik arus kas                   business model for managing the asset
               dari aset tersebut. Ada tiga kategori                       and the cash flow characteristics of the
               pengukuran yang Grup mengklasifikasikan                     asset. There are three measurement
               instrumen utangnya:                                         categories into which the Group classifies
                                                                           its debt instruments:

               -    Biaya perolehan diamortisasi: Aset                     -    Amortised cost: Assets that are held
                    yang dimiliki untuk mengumpulkan                            for the collection of contractual cash
                    arus kas kontraktual dimana arus kas                        flows in cases where such cash flows
                    tersebut hanya mewakili pembayaran                          represent SPPI are measured at
                    pokok dan bunga diukur dengan biaya                         amortised cost. A gain or loss on a
                    perolehan diamortisasi. Keuntungan                          debt investment that is subsequently
                    atau kerugian dari investasi utang                          measured at amortised cost and that
                    yang selanjutnya diukur pada biaya                          is not part of a hedging relationship is
                    perolehan diamortisasi dan bukan                            recognised in profit or loss when the
                    merupakan bagian dari hubungan                              asset is derecognised or impaired.
                    lindung nilai, diakui dalam laba rugi                       Interest income from these financial
                    pada saat aset tersebut dihentikan                          assets is included in finance income
                    pengakuannya       atau    penurunan                        using the effective interest rate
                    nilainya. Pendapatan bunga dari aset                        method.
                    keuangan tersebut dimasukkan ke
                    dalam pendapatan keuangan dengan
                    menggunakan metode suku bunga
                    efektif.
Page 31
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                  Lampiran 5/21 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                            NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                   FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                              JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)          (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI       KEBIJAKAN                 AKUNTANSI          3.   MATERIAL       ACCOUNTING                     POLICY
     MATERIAL (lanjutan)                                               INFORMATION (continued)

     f.   Aset keuangan (lanjutan)                                     f.   Financial assets (continued)

          i.   Klasifikasi, pengakuan dan pengukuran                        i.   Classification,   recognition            and
               (lanjutan)                                                        measurement (continued)

               Instrumen utang (lanjutan)                                        Debt instruments (continued)

               -    Nilai wajar melalui penghasilan                              -   Fair       value     through        other
                    komprehensif lain: Aset yang dimiliki                            comprehensive income: Assets that
                    untuk      mendapatkan        arus    kas                        are held for the collection of
                    kontraktual dan untuk menjual aset                               contractual cash flows and for selling
                    keuangan, di mana arus kas aset                                  the financial assets, in cases where
                    tersebut hanya atas pembayaran                                   the assets’ cash flows represent SPPI,
                    pokok dan bunga, diukur pada nilai                               are measured at FVOCI. Movements
                    wajar        melalui         penghasilan                         in the carrying amount are taken
                    komprehensif lain. Perubahan nilai                               through other comprehensive income,
                    tercatat dilakukan melalui penghasilan                           except for the recognition of
                    komprehensif lain, kecuali untuk                                 impairment gains or losses, interest
                    pengakuan keuntungan atau kerugian                               revenue and foreign exchange gains
                    penurunan nilai, pendapatan bunga                                and losses which are recognised in
                    dan keuntungan dan kerugian selisih                              profit or loss. When the financial asset
                    kurs yang diakui dalam laba rugi.                                is derecognised, the cumulative gain
                    Ketika aset keuangan dihentikan                                  or loss previously recognised in OCI is
                    pengakuannya, keuntungan atau                                    reclassified from equity to profit or loss
                    kerugian kumulatif yang sebelumnya                               and recognised in other income and
                    diakui di penghasilan komprehensif                               expenses. Interest income from these
                    lain direklasifikasi dari ekuitas ke laba                        financial assets is included in finance
                    rugi dan diakui dalam penghasilan                                income using the effective interest rate
                    atau beban lain-lain. Pendapatan                                 method. Foreign exchange gains and
                    bunga dari aset keuangan tersebut                                losses are presented in other gains
                    dimasukkan ke dalam pendapatan                                   and losses on foreign exchanges, net
                    keuangan dengan menggunakan                                      and impairment expenses in other
                    metode       suku      bunga       efektif.                      expenses.
                    Keuntungan dan kerugian selisih kurs
                    disajikan dalam penghasilan dan
                    beban kurs mata uang asing dan
                    beban penurunan nilai pada beban
                    lain-lain.

               -    Nilai wajar melalui laba rugi: Aset yang                     -   Fair value through profit or loss:
                    tidak memenuhi kriteria untuk biaya                              Assets that do not meet the criteria for
                    perolehan diamortisasi atau nilai wajar                          amortised cost or FVOCI are
                    melalui penghasilan komprehensif lain                            measured at fair value through profit
                    diukur pada nilai wajar melalui laporan                          or loss. A gain or loss on a debt
                    laba rugi. Keuntungan atau kerugian                              investment that is subsequently
                    dari investasi utang yang selanjutnya                            measured at fair value through profit
                    diukur pada nilai wajar melalui laporan                          or loss and that is not part of a hedging
                    laba rugi dan bukan merupakan                                    relationship, is recognised in profit or
                    bagian dari hubungan lindung nilai,                              loss and presented net in profit or loss.
                    diakui dalam laba rugi dan disajikan
                    bersih dalam laba rugi.
Page 32
                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                               Lampiran 5/22 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                               FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                          JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)      (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI       KEBIJAKAN               AKUNTANSI        3.   MATERIAL       ACCOUNTING                     POLICY
     MATERIAL (lanjutan)                                           INFORMATION (continued)

     f.   Aset keuangan (lanjutan)                                 f.   Financial assets (continued)

          ii.   Penghentian pengakuan                                   ii.   Derecognition

                Aset keuangan dihentikan pengakuannya                         Financial assets are derecognised when
                ketika hak untuk menerima arus kas dari                       the rights to receive cash flows from the
                investasi tersebut telah jatuh tempo atau                     investments have expired or have been
                telah ditransfer dan Grup telah mentransfer                   transferred and the Group has transferred
                secara substansial seluruh risiko dan                         substantially all the risks and rewards of
                manfaat atas kepemilikan aset.                                ownership.

          iii. Saling hapus antar instrumen keuangan                    iii. Offsetting financial instruments

                Aset keuangan dan liabilitas keuangan                         Financial assets and liabilities are offset
                disalinghapuskan dan jumlah netonya                           and the net amount is reported in the
                dilaporkan pada laporan posisi keuangan                       consolidated statement of financial position
                konsolidasian ketika terdapat hak yang                        when there is a legally enforceable right to
                berkekuatan hukum untuk melakukan                             offset the recognised amounts and there is
                saling hapus atas jumlah yang telah diakui                    an intention to settle on a net basis, or
                tersebut      dan   adanya   niat   untuk                     realise the asset and settle the liability
                menyelesaikan secara neto, atau untuk                         simultaneously.
                merealisasikan aset dan menyelesaikan
                liabilitas secara bersamaan.

     g.   Penurunan nilai aset keuangan                            g. Impairment of financial assets

          Pada setiap tanggal pelaporan, Grup menilai                   At each reporting date, the Group assesses
          apakah risiko kredit dari instrumen keuangan                  whether the credit risk on a financial instrument
          telah meningkat secara signifikan sejak                       has increased significantly since initial
          pengakuan awal. Ketika melakukan penilaian,                   recognition. When making the assessment, the
          Grup menggunakan perubahan atas risiko                        Group uses the change in the risk of a default
          gagal bayar yang terjadi sepanjang perkiraan                  occurring over the expected life of the financial
                                                                        instrument instead of the change in the amount
          usia instrumen keuangan daripada perubahan
                                                                        of expected credit losses. To make that
          atas jumlah kerugian kredit ekspektasian.                     assessment, the Group compares the risk of a
          Dalam       melakukan       penilaian,   Grup                 default occurring on the financial instrument as
          membandingkan antara risiko gagal bayar yang                  at the reporting date with the risk of a default
          terjadi atas instrumen keuangan pada saat                     occurring on the financial instrument as at the
          tanggal pelaporan dengan risiko gagal bayar                   date of initial recognition and considers
          yang terjadi atas instrumen keuangan pada                     reasonable and supportable information, which
          saat pengakuan awal dan mempertimbangkan                      is available without undue cost or effort at the
          kewajaran serta ketersediaan informasi yang                   reporting date about past events, current
          tersedia pada saat tanggal pelaporan terkait                  conditions and forecasts of future economic
          dengan kejadian masa lalu, kondisi terkini dan                conditions, that is indicative of significant
          perkiraan atas kondisi ekonomi di masa depan,                 increases in credit risk since initial recognition.
          yang mengindikasikan kenaikan risiko kredit
          sejak pengakuan awal.
Page 33
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                               Lampiran 5/23 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                               FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                          JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)      (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI       KEBIJAKAN               AKUNTANSI        3.   MATERIAL       ACCOUNTING                     POLICY
     MATERIAL (lanjutan)                                           INFORMATION (continued)

     g.   Penurunan nilai aset keuangan (lanjutan)                 g.   Impairment of financial assets (continued)

          Grup     menerapkan       “pendekatan       yang              The Group applies the “simplified approach” to
          disederhanakan” untuk mengukur kerugian                       measuring expected credit losses which uses a
          kredit ekspektasian yang menggunakan                          lifetime expected credit loss allowance for all
          cadangan kerugian kredit ekspektasian seumur                  trade receivables, other receivables and
          hidup untuk seluruh saldo piutang usaha, dan                  contract assets without significant financing
          piutang lain-lain, dan aset kontrak tanpa                     components. The expected credit loss reviews
                                                                        include assumptions about the risk of default
          komponen      pendanaan yang signifikan.
                                                                        and expected loss rates. To measure the
          Penelaahan kerugian kredit ekspektasian                       expected credit losses, trade receivables have
          termasuk asumsi mengenai risiko gagal bayar                   been grouped based on similar credit risk
          dan tingkat kerugian ekspektasian. Untuk                      characteristics and the days past due, with the
          mengukur kerugian kredit ekspektasian,                        exception of the receivables which can be
          piutang     usaha     telah      dikelompokkan                assessed at their own rating of expected credit
          berdasarkan karakteristik risiko kredit dan jatuh             losses.
          tempo yang serupa, terkecuali kepada piutang-
          piutang yang dapat dinilai sendiri kerugian
          kredit ekspektasiannya.

     h.   Aset tetap                                               h.   Property, plant and equipment

          Aset tetap pada awalnya diakui sebesar biaya                  Property, plant and equipment are initially
          perolehan yang meliputi harga perolehannya                    recognised at cost, which comprises the
          dan setiap biaya yang dapat diatribusikan                     purchase price and any cost directly
          langsung untuk membawa aset ke kondisi dan                    attributable to bringing the asset to the location
          lokasi yang diinginkan agar aset siap digunakan               and condition necessary for it to be capable of
          sesuai intensi manajemen.                                     operating in the manner intended by
                                                                        management.

          Setelah pengakuan awal, kelas-kelas aset                      After initial recognition, the following classes of
          berikut ini yang diukur menggunakan metode                    assets are measured using the revaluation
          revaluasi:                                                    method:
          •    Hak atas tanah;                                          •    Land rights;
          •    Bangunan umum, waduk, dan prasarana;                     •    Buildings, reservoirs and infrastructure;
          •    Instalasi dan mesin pembangkit;                          •    Installations and power plants;
          •    Perlengkapan transmisi;                                  •    Transmission equipment;
          •    Perlengkapan distribusi;                                 •    Distribution equipment;
          •    Perlengkapan pengolahan data dan                         •    Telecommunications and data processing
               telekomunikasi yang digunakan dalam                           equipment used for electricity supply; and
               penyediaan listrik; dan
          •    Material cadangan utama.                                 •   Major spare parts.
Page 34
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                               Lampiran 5/24 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                               FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                          JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)      (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI       KEBIJAKAN               AKUNTANSI        3.   MATERIAL       ACCOUNTING                     POLICY
     MATERIAL (lanjutan)                                           INFORMATION (continued)

     h.   Aset tetap (lanjutan)                                    h.   Property, plant and equipment (continued)

          Kelas aset di atas, disajikan sebesar nilai wajar             The classes of asset above are shown at fair
          dikurangi penyusutan dan penurunan nilai,                     value less subsequent depreciation and
          kecuali hak atas tanah. Hak atas tanah tidak                  impairment losses, except land rights. Land
          disusutkan. Penilaian terhadap aset-aset                      rights are not depreciated. The valuation of
          tersebut dilakukan oleh penilai independen                    those assets is performed by external
          eksternal yang terdaftar di OJK. Penilaian atas               independent valuers which are registered with
          aset tersebut dilakukan secara berkala untuk                  the FSA. Valuations are performed with
          memastikan bahwa nilai wajar aset yang                        sufficient regularity to ensure that the fair value
          direvaluasi tidak berbeda secara material                     of a revalued asset does not differ materially
          dengan       nilai   tercatatnya.   Manajemen                 from its carrying amount. Management
          melakukan revaluasi aset secara berkala.                      revaluates the assets in regular basis. Any
          Akumulasi penyusutan pada tanggal revaluasi                   accumulated depreciation at the date of
          dieliminasi terhadap nilai tercatat bruto aset,               revaluation is eliminated against the gross
          dan nilai netonya disajikan kembali sebesar                   carrying amount of the asset and the net
          nilai revaluasi aset tetap.                                   amount is presented to the revalued amount of
                                                                        the property, plant and equipment.

          Kenaikan nilai tercatat yang timbul dari                      Increases in the carrying amount arising on
          revaluasi aset tetap yang menggunakan model                   revaluation of property, plant and equipment
          revaluasi dikreditkan pada “surplus revaluasi                 that use a revaluation model are credited to
          aset tetap” sebagai bagian dari penghasilan                   “property, plant and equipment revaluation
          komprehensif       lain.   Penurunan     yang                 surplus” as part of other comprehensive
          menghapus nilai kenaikan yang sebelumnya                      income. Decreases that offset previous
          atas aset yang sama dibebankan terhadap                       increases of the same asset are debited against
          “surplus revaluasi aset tetap” sebagai bagian                 “property, plant and equipment revaluation
          dari penghasilan komprehensif lain. Apabila                   surplus” as part of other comprehensive
          penurunan melebihi “surplus revaluasi aset                    income. If the decrease exceeds the “property,
          tetap”, maka selisih lebihnya dibebankan pada                 plant and equipment revaluation surplus”, the
          laba rugi.                                                    excess difference is charged to profit or loss.

          Terkait hak atas tanah, Grup menganalisis                     For land rights, the Group analyses the facts
          fakta dan keadaan untuk masing-masing jenis                   and circumstances for each type of land rights
          hak atas tanah dalam menentukan akuntansi                     in determining the accounting for each of these
          untuk masing-masing hak atas tanah tersebut                   land rights so that it can accurately represent an
          sehingga dapat merepresentasikan dengan                       underlying economic event or transaction. If the
          tepat suatu kejadian atau transaksi ekonomis                  land rights do not transfer control of the
          yang mendasarinya. Jika hak atas tanah                        underlying assets to the Group, but give the
          tersebut tidak mengalihkan pengendalian atas                  rights to use the underlying assets, the Group
          aset pendasar kepada Grup, melainkan                          accounts for these transactions as leases under
          mengalihkan hak untuk menggunakan aset                        SFAS No. 116, “Leases”. If the land rights are
          pendasar, Grup menerapkan perlakuan                           substantially similar to land purchases, the
          akuntansi atas transaksi tersebut sebagai sewa                Group applies SFAS No. 216, “Property, plant
          berdasarkan PSAK No. 116, “Sewa”. Jika hak                    and equipment” under which land rights are
          atas tanah secara substansi menyerupai                        recognised at cost and not depreciated.
          pembelian tanah, maka Grup menerapkan
          PSAK No. 216, “Aset Tetap” yaitu hak atas
          tanah diakui sebesar harga perolehan dan tidak
          disusutkan.
Page 35
                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/25 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                          NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                 FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                            JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)        (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI       KEBIJAKAN                AKUNTANSI         3.        MATERIAL       ACCOUNTING                        POLICY
     MATERIAL (lanjutan)                                                  INFORMATION (continued)

     h.   Aset tetap (lanjutan)                                           h.   Property, plant and equipment (continued)

          Aset tetap, kecuali hak atas tanah, disusutkan                       Property, plant and equipment, except land
          hingga mencapai estimasi nilai sisa dengan                           rights, are depreciated to their residual values
          menggunakan metode garis lurus selama masa                           using the straight-line method over their
          manfaatnya sebagai berikut:                                          expected useful lives as follows:

                                                            Tahun/Years

          Bangunan umum, waduk, dan prasarana                   10 - 50                      Buildings, reservoirs, and infrastructure
          Instalasi dan mesin pembangkit                        12 - 40                               Installations and power plants
          Perlengkapan transmisi                                  40                                        Transmission equipment
          Perlengkapan distribusi                               10 - 40                                       Distribution equipment
          Perlengkapan umum                                       5                                               General equipment
          Kendaraan bermotor                                      5                                                   Motor vehicles
          Material cadangan utama                               10 - 40                                             Major spare parts
          Perlengkapan pengolahan data dan                                                                 Telecommunications and
            telekomunikasi yang digunakan                                                               data processing equipment
            dalam penyediaan listrik                                 10                                  used for electricity supply
          Perlengkapan pengolahan data dan                                                      Other telecommunications and data
            telekomunikasi lainnya                                10                                       processing equipmentAA
          Kapal dan perlengkapan                                10 - 25                                      Vessels and equipment

          Masa manfaat ekonomis, nilai sisa, dan metode                        The useful lives, residual values and
          penyusutan aset tetap ditelaah, jika diperlukan,                     depreciation methods of property, plant and
          setidaknya disesuaikan, pada setiap akhir tahun                      equipment are reviewed and adjusted if
          buku. Dampak dari setiap revisi diakui dalam laba                    appropriate, at the end of each financial year.
          rugi, ketika perubahan terjadi.                                      The effects of any revisions are recognised in
                                                                               profit or loss, when the changes arise.
          Nilai tercatat aset segera diturunkan sebesar                        An asset’s carrying amount is written down
          jumlah yang dapat dipulihkan apabila nilai                           immediately to its recoverable amount if the
          tercatat aset lebih besar daripada estimasi                          asset’s carrying amount is greater than its
          jumlah yang dapat dipulihkan (Catatan 3.j).                          estimated recoverable amount (Note 3.j).
          Beban perbaikan dan pemeliharaan dibebankan                          The costs of repairs and maintenance are
          pada laba rugi pada saat terjadinya. Biaya-biaya                     charged to profit or loss as incurred.
          lain yang terjadi selanjutnya yang timbul untuk                      Subsequent costs incurred to add to, replace
          menambah, mengganti atau memperbaiki aset                            part of, or service an item of property, plant and
          tetap diakui sebagai biaya perolehan aset jika                       equipment, are recognised as assets if and only
          dan hanya jika besar kemungkinan manfaat                             if it is probable that future economic benefits
          ekonomis di masa depan berkenaan dengan aset                         associated with the item will flow to the entity
          tersebut akan mengalir ke entitas dan biaya                          and the cost of the item can be measured
          perolehan aset dapat diukur secara andal.                            reliably.

          Aset tetap yang tidak digunakan lagi atau dijual,                    For property, plant and equipment which can no
          nilai tercatatnya dikeluarkan dari aset tetap Grup.                  longer be utilised or sold, the carrying amount
          Keuntungan atau kerugian dari pelepasan aset                         is eliminated from the Group’s property, plant
          tetap tersebut diakui dalam laba rugi.                               and equipment. The resulting gains or losses on
                                                                               disposals of property, plant and equipment are
                                                                               recognised in profit or loss.

          Jika aset yang direvaluasi dihapuskan, jumlah                        When revalued assets are disposed, the
          yang dicatat di dalam ekuitas dipindahkan ke                         amounts included in equity are transferred to
          saldo laba.                                                          retained earnings.
Page 36
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/26 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                         NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                           JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)       (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI       KEBIJAKAN               AKUNTANSI         3.   MATERIAL       ACCOUNTING                   POLICY
     MATERIAL (lanjutan)                                            INFORMATION (continued)

     h.   Aset tetap (lanjutan)                                     h.   Property, plant and equipment (continued)

          Aset tidak digunakan dalam operasi terdiri dari                Assets not used in operations consist of
          aset tetap yang akan direlokasi/ditransfer,                    property, plant and equipment that will be
          sedang diperbaiki, dan akan dihapus. Aset                      relocated/transferred, repaired, and disposed.
          yang tidak digunakan dalam operasi, kecuali                    Assets not used in operations, except for assets
          aset yang akan dihapus, disusutkan dengan                      to be disposed, are depreciated using the same
          metode garis lurus dan berdasarkan taksiran                    method and based on the economic useful lives
          masa manfaat ekonomis yang sama dengan                         of the property, plant and equipment.
          aset tetap.

          Aset dalam pembangunan                                         Construction in progress

          Aset dalam pembangunan merupakan biaya-                        Construction in progress represents costs
          biaya yang berhubungan langsung dengan                         directly attributable to the construction of
          pembangunan aset tetap. Aset dalam                             property, plant and equipment. Construction in
          pembangunan dinyatakan sebesar biaya                           progress is stated at cost, which includes
          perolehan, termasuk biaya pinjaman selama                      borrowing costs during construction on debts
          masa pembangunan dari pinjaman yang                            incurred to finance the construction,
          digunakan untuk pembangunan, beban                             depreciation of property, plant and equipment
          penyusutan aset tetap yang digunakan dalam                     used in the construction and cost of testing
          pekerjaan pembangunan dan biaya pengujian                      whether the asset is functioning properly.
          ketika aset dapat berfungsi. Aset dalam                        Construction in progress is transferred to the
          pembangunan akan dipindahkan ke masing-                        respective property, plant and equipment
          masing aset tetap yang bersangkutan pada                       account when completed and ready for use.
          saat selesai dan siap digunakan. Penyusutan                    Depreciation is charged from the date on which
          dimulai pada saat aset tersebut siap untuk                     the assets are ready for use in the manner
          digunakan sesuai dengan tujuan yang                            intended by management.
          diinginkan manajemen.

          Aset yang memiliki masa manfaat yang tidak                     Assets that have an indefinite useful life - for
          terbatas, misalnya goodwill, tidak diamortisasi                example, goodwill - are not subject to
          namun diuji penurunan nilainya setiap tahun                    amortisation but are tested annually for
          atau lebih sering apabila terdapat peristiwa atau              impairment, or more frequently if events or
          perubahan pada kondisi yang mengindikasikan                    changes in circumstances indicate that they
          kemungkinan penurunan nilai. Aset yang                         might be impaired. Assets that are subject to
          diamortisasi diuji ketika terdapat indikasi bahwa              amortisation are reviewed for impairment
          nilai tercatatnya mungkin tidak dapat                          whenever events or changes in circumstances
          dipulihkan. Penurunan nilai diakui jika nilai                  indicate that the carrying amount may not be
          tercatat aset melebihi jumlah terpulihkan.                     recoverable. An impairment loss is recognised
          Jumlah terpulihkan adalah yang lebih tinggi                    for the amount by which the asset’s carrying
          antara nilai wajar aset dikurangi biaya                        amount exceeds its recoverable amount. The
          pelepasan dan nilai pakai aset. Dalam                          recoverable amount is the higher of an asset’s
          menentukan         penurunan        nilai,    aset             fair value less costs of disposal and value-in-
          dikelompokkan pada tingkat yang paling                         use. For the purposes of assessing impairment,
          rendah dimana terdapat arus kas yang dapat                     assets are grouped at the lowest levels for
          diidentifikasi.                                                which there are separately identifiable cash
                                                                         flows.
Page 37
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/27 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                             FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                        JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)    (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI       KEBIJAKAN              AKUNTANSI       3.   MATERIAL       ACCOUNTING                      POLICY
     MATERIAL (lanjutan)                                         INFORMATION (continued)

     i.   Penurunan nilai aset nonkeuangan                       i.   Impairment of non-financial assets

          Aset nonkeuangan selain goodwill yang                       Non-financial assets other than goodwill that
          mengalami penurunan nilai diuji setiap tanggal              suffer impairment are reviewed for a possible
          pelaporan untuk menentukan apakah terdapat                  reversal of the impairment at each reporting
          kemungkinan pemulihan penurunan nilai.                      date. Reversal of impairment losses for assets
          Pembalikan rugi penurunan nilai untuk aset                  other than goodwill would be recognised if, and
          selain goodwill, diakui jika dan hanya jika,                only if, there has been a change in the
          terdapat perubahan estimasi yang digunakan                  estimates used to determine the asset’s
          dalam menentukan jumlah terpulihkan aset                    recoverable amount since the last impairment
          sejak pengujian penurunan nilai terakhir kali               testing was carried out. Reversal of impairment
          dilakukan. Pembalikan rugi penurunan nilai                  losses will be immediately recognised in profit
          tersebut diakui langsung dalam laba rugi. Rugi              or loss. Impairment losses relating to goodwill
          penurunan nilai yang diakui atas goodwill tidak             would not be reversed.
          dibalik lagi.

     j.   Utang usaha                                            j.   Trade payables

          Utang usaha adalah kewajiban untuk                          Trade payables are obligations to pay for goods
          membayar barang atau jasa yang telah diterima               or services that have been acquired in the
          dalam kegiatan usaha normal dari pemasok.                   ordinary course of business from suppliers.
          utang usaha diklasifikasikan sebagai liabilitas             Trade payables are classified as current
          jangka pendek apabila pembayarannya jatuh                   liabilities if payment is due within one year or
          tempo dalam waktu satu tahun atau kurang                    less of the reporting date. If not, they are
          setelah tanggal pelaporan. jika tidak, utang                presented as non-current liabilities.
          usaha tersebut disajikan sebagai liabilitas
          jangka panjang.

          Utang usaha pada awalnya diakui sebesar nilai               Trade payables are recognised initially at fair
          wajar dan selanjutnya diukur pada biaya                     value and subsequently measured at amortised
          perolehan diamortisasi dengan menggunakan                   cost using the effective interest method.
          metode suku bunga efektif.

     k.   Sewa                                                   k.   Leases

          Grup sebagai pesewa                                         The Group as a lessor

          Ketika Grup bertindak sebagai pesewa, Grup                  When the Group acts as a lessor, it will classify
          akan mengklasifikasi masing-masing sewanya                  each of its leases as either an operating lease
          baik sewa operasi atau sewa pembiayaan.                     or a finance lease.

          Untuk mengklasifikasi masing-masing sewa,                   To classify each lease, the Group makes an
          Grup membuat penilaian secara keseluruhan                   overall assessment of whether the lease
          atas apakah sewa mengalihkan secara                         transfers substantially all of the risks and
          substansial seluruh risiko dan manfaat yang                 rewards incidental to the ownership of the
          terkait dengan kepemilikan aset pendasar. Jika              underlying asset. If this is the case, then the
          penilaian membuktikan hal tersebut, maka                    lease is classified as a finance lease; if not, then
          sewa      diklasifikasikan   sebagai    sewa                it is an operating lease.
          pembiayaan; jika tidak, maka merupakan sewa
          operasi.
Page 38
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/28 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                         NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                           JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)       (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI       KEBIJAKAN               AKUNTANSI         3.   MATERIAL       ACCOUNTING                     POLICY
     MATERIAL (lanjutan)                                            INFORMATION (continued)

     k.   Sewa (lanjutan)                                           k.   Leases (continued)

          Grup sebagai pesewa (lanjutan)                                 The Group as a lessor (continued)

          Pendapatan sewa dari operasi sewa dimana                       Lease income from operating leases where the
          Grup bertindak sebagai pesewa diakui sebagai                   Group is a lessor is recognised as revenue on
          pendapatan secara garis lurus selama masa                      a straight-line basis over the lease term. Initial
          sewa. Biaya langsung awal yang terjadi saat                    direct costs incurred in obtaining an operating
          mendapatkan sewa operasi ditambahkan pada                      lease are added to the carrying amount of the
          nilai tercatat aset pendasar dan diakui sebagai                underlying asset and recognised as expense
          beban selama masa sewa dengan basis yang                       over the lease term on the same basis as lease
          sama dengan pendapatan sewa. Aset terkait                      income. The respective leased assets are
          yang disewakan ditampilkan di laporan posisi                   included in the statement of financial position
          keuangan berdasarkan sifatnya.                                 based on their nature.

          Grup sebagai penyewa                                           The Group as a lessee

          Penentuan      apakah    suatu    perjanjian                   Determination of whether an arrangement is, or
          merupakan, atau mengandung, sewa dibuat                        contains, a lease is made based on the
          berdasarkan substansi perjanjian itu sendiri                   substance of the arrangement and assessment
          dan penilaian apakah pemenuhan atas                            of whether fulfilment of the arrangement is
          perjanjian bergantung dari penggunaan aset                     dependent on the use of a specific asset or
          tertentu atau aset, dan apakah perjanjian                      assets, and the arrangement conveys a right to
          memberikan hak untuk menggunakan aset.                         use the asset.

          Grup menyewa aset tetap tertentu. Kontrak                      The Group leases certain property, plant and
          sewa biasanya dibuat untuk periode tetap dari                  equipment. Rental contracts are typically made
          2 hingga 20 tahun tetapi mungkin memiliki opsi                 for fixed periods of 2 to 20 years but may have
          ekstensi. Kontrak dapat berisi komponen sewa                   extension options. Contracts may contain both
          dan non-sewa berdasarkan harga relatif yang                    lease and non-lease components based on
          berdiri sendiri.                                               their relative stand-alone prices.

          Sewa diakui sebagai aset hak guna dan                          Leases are recognised as a right-of-use asset
          liabilitas terkait pada tanggal di mana aset                   and a corresponding liability at the date on
          sewaan tersedia untuk digunakan oleh Grup.                     which the leased asset is available for use by
                                                                         the Group.

          Aset dan liabilitas yang timbul dari sewa pada                 Assets and liabilities arising from a lease are
          awalnya diukur dengan basis nilai kini. Liabilitas             initially measured on a present value basis.
          sewa termasuk nilai bersih sekarang dari                       Lease liabilities include the net present value of
          pembayaran sewa berikut:                                       the following lease payments:

          -   pembayaran tetap (termasuk pembayaran                      -   fixed payments (including in-substance
              tetap secara substansi), dikurangi piutang                     fixed payments), less any lease incentives
              insentif sewa;                                                 receivables;
          -   pembayaran      sewa     variabel     yang                 -   variable lease payments that are based on
              didasarkan pada indeks atau tingkat, pada                      an index or a rate, initially measured using
              awalnya diukur menggunakan indeks atau                         the index or rate as at the commencement
              tingkat pada tanggal mulai;                                    date;
          -   jumlah yang diperkirakan akan dibayarkan                   -   amounts expected to be payable by the
              oleh penyewa berdasarkan jaminan nilai                         lessee under residual value guarantees;
              residu;
          -   harga pelaksanaan dari opsi pembelian                      -   the exercise price of a purchase option if
              jika penyewa cukup yakin untuk                                 the lessee is reasonably certain to exercise
              menggunakan opsi tersebut; dan                                 that option; and
          -   pembayaran penalti untuk penghentian                       -   payments of penalties for terminating the -
              sewa, jika masa sewa mencerminkan                              lease, if the lease term reflects the lessee
              penyewa yang melaksanakan opsi                                 exercising that option.
              tersebut.
Page 39
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/29 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                         NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                           JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)       (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI       KEBIJAKAN               AKUNTANSI         3.   MATERIAL       ACCOUNTING                      POLICY
     MATERIAL (lanjutan)                                            INFORMATION (continued)

     k.   Sewa (lanjutan)                                           k.   Leases (continued)

          Grup sebagai penyewa (lanjutan)                                The Group as a lessee (continued)

          Pembayaran sewa yang harus dilakukan                           Lease payments to be made under reasonably
          berdasarkan opsi perpanjangan tertentu juga                    certain extension options are also included in
          termasuk dalam pengukuran liabilitas.                          the measurement of the liability.

          Pembayaran sewa didiskontokan dengan                           The lease payments are discounted using the
          menggunakan suku bunga implisit dalam sewa.                    interest rate implicit in the lease. If the rate
          Jika tarif tidak dapat segera ditentukan, di mana              cannot be readily determined, which is
          hal tersebut secara umum terjadi pada sewa                     generally the case for leases in the Group, the
          dalam Grup, suku bunga pinjaman inkremental                    lessee’s incremental borrowing rate is used,
          penyewa digunakan, yaitu tarif yang harus                      being the rate that the individual lessee would
          dibayar oleh penyewa untuk meminjam dana                       have to pay to borrow the funds necessary to
          yang diperlukan untuk memperoleh aset                          obtain an asset of similar value to the right-of-
          dengan nilai yang sama dengan aset hak guna                    use asset in a similar economic environment
          dalam lingkungan ekonomi serupa dengan                         with similar terms, security and conditions.
          syarat dan ketentuan yang serupa.

          Untuk menentukan suku bunga pinjaman                           To determine the incremental borrowing rate,
          inkremental, Grup:                                             the Group:

          -   jika    memungkinkan,      menggunakan                     -   where possible, uses recent third-party
              pembiayaan pihak ketiga terkini yang                           financing received by the individual lessee
              diterima oleh penyewa individu sebagai                         as a starting point, adjusted to reflect
              titik     awal,    disesuaikan     untuk                       changes in financing conditions since third
              mencerminkan       perubahan      kondisi                      party financing was received;
              pembiayaan sejak pembiayaan pihak
              ketiga diterima;
          -   menggunakan pendekatan build-up yang                       -   uses a build-up approach that starts with a
              dimulai dengan suku bunga bebas risiko                         risk free interest rate adjusted for credit risk
              yang disesuaikan dengan risiko kredit                          for leases held by the Group, where there
              untuk sewa yang dimiliki oleh Grup, yang                       is no recent third-party financing; and
              tidak memiliki pembiayaan pihak ketiga
              baru-baru ini; dan
          -   membuat penyesuaian spesifik untuk                         -   makes adjustments specific to the lease,
              sewa, misalnya jangka waktu, mata uang,                        e.g., term, currency and security.
              dan jaminan.

          Grup dihadapkan pada potensi kenaikan di                       The Group is exposed to potential future
          masa depan dalam pembayaran sewa variabel                      increases in variable lease payments based on
          berdasarkan indeks atau tarif, yang tidak                      an index or rate, which are not included in the
          termasuk dalam liabilitas sewa sampai                          lease liability until they take effect. When
          diberlakukan. Ketika penyesuaian pembayaran                    adjustments to lease payments based on an
          sewa berdasarkan indeks atau suku bunga                        index or rate take effect, the lease liability is
          mulai berlaku, liabilitas sewa dinilai kembali dan             reassessed and adjusted against the right-of-
          disesuaikan dengan aset hak guna.                              use asset.

          Pembayaran sewa dialokasikan antara biaya                      Lease payments are allocated between
          pokok dan keuangan. Biaya keuangan                             principal and finance cost. The finance cost is
          dibebankan pada laporan laba rugi selama                       charged to profit or loss over the lease period
          masa sewa sehingga menghasilkan suku                           so as to produce a constant periodic rate of
          bunga periodik yang konstan atas sisa saldo                    interest on the remaining balance of the liability
          liabilitas untuk setiap periode.                               for each period.
Page 40
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                               Lampiran 5/30 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                               FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                          JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)      (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI       KEBIJAKAN               AKUNTANSI        3.   MATERIAL       ACCOUNTING                     POLICY
     MATERIAL (lanjutan)                                           INFORMATION (continued)

     k.   Sewa (lanjutan)                                          k.   Leases (continued)

          Grup sebagai penyewa (lanjutan)                               The Group as a lessee (continued)

          Aset hak guna diukur pada biaya perolehan                     Right-of-use assets are measured at cost
          yang terdiri dari berikut ini:                                comprising the following:

          -   jumlah pengukuran awal liabilitas sewa;                   -   the amount of the initial measurement of
                                                                            lease liability;
          -   pembayaran sewa yang dilakukan pada                       -   any lease payments made at or before the
              atau sebelum tanggal dimulainya dikurangi                     commencement date less any lease
              insentif sewa yang diterima; dan                              incentives received; and
          -   biaya langsung awal, dan biaya restorasi.                 -   any initial direct costs, and restoration
                                                                            costs.

          Aset hak guna umumnya disusutkan sepanjang                    Right-of-use assets are generally depreciated
          waktu yang lebih pendek antara lama masa                      over the shorter of the asset’s useful life and the
          manfaat aset dan jangka waktu sewa                            lease term on a straight-line basis. If the Group
          menggunakan metode garis lurus. Jika Grup                     is reasonably certain to exercise a purchase
          cukup yakin untuk melaksanakan opsi                           option, the right-of-use assets are depreciated
          pembelian, aset hak guna disusutkan selama                    over the underlying assets’ useful life.
          masa manfaat aset yang mendasarinya.

          Aset hak guna juga mengalami penurunan nilai                  The right-of-use assets are also subject to
          (Catatan 3.j).                                                impairment (Note 3.j).

          Pembayaran terkait dengan sewa jangka                         Payments associated with short-term leases
          pendek dan sewa aset bernilai rendah diakui                   and leases of low-value assets are recognised
          atas dasar garis lurus sebagai beban dalam                    on a straight-line basis as an expense in profit
          laporan laba rugi. Sewa jangka pendek adalah                  or loss. Short-term leases are leases with a
          sewa dengan masa sewa 12 bulan atau kurang.                   lease term of 12 months or less. Low-value
          Aset bernilai rendah terdiri dari peralatan                   assets comprise general equipment.
          umum.

          Opsi ekstensi dan terminasi                                   Extension and termination options

          Opsi ekstensi dan terminasi termasuk dalam                    Extension and termination options are included
          sejumlah sewa properti dan peralatan di                       in a number of property and equipment leases
          seluruh Grup. Istilah-istilah ini digunakan untuk             across the Group. These terms are used to
          memaksimalkan fleksibilitas operasional dalam                 maximise operational flexibility in terms of
          hal pengelolaan kontrak. Mayoritas opsi                       managing contracts. The majority of extension
          ekstensi dan terminasi yang dimiliki hanya                    and termination options held are exercisable
          dapat dilaksanakan oleh Grup dan bukan oleh                   only by the Group and not by the respective
          pemberi sewa masing-masing.                                   lessor.

          Jaminan nilai residu                                          Residual value guarantees

          Untuk mengoptimalkan biaya sewa selama                        To optimise lease costs during the contract
          periode kontrak, Grup terkadang memberikan                    period, the Group sometimes provides residual
          jaminan nilai residu sehubungan dengan sewa                   value guarantees in relation to equipment
          peralatan.                                                    leases.
Page 41
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/31 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                       NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                              FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                         JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)     (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI       KEBIJAKAN              AKUNTANSI        3.   MATERIAL       ACCOUNTING                        POLICY
     MATERIAL (lanjutan)                                          INFORMATION (continued)

     k.   Sewa (lanjutan)                                         k.   Leases (continued)

          Grup sebagai penyewa (lanjutan)                              The Group as a lessee (continued)

          Modifikasi sewa                                              Lease modification

          Penyewa mencatat modifikasi sewa sebagai                     A lessee shall account for a lease modification
          sewa terpisah jika:                                          as a separate lease if both:

          -   modifikasi meningkatkan ruang lingkup                     -   the modification increases the scope of the
              sewa dengan menambahkan hak untuk                             lease by adding the right to use one or
              menggunakan satu aset pendasar atau                           more underlying assets; and
              lebih; dan
          -   imbalan sewa meningkat sebesar jumlah                     -   the consideration for the lease increases
              yang setara dengan harga tersendiri untuk                     by an amount commensurate with the
              peningkatan dalam ruang lingkup dan                           stand-alone price for the increase in scope
              penyesuaian yang tepat pada harga                             and any appropriate adjustments to that
              tersendiri tersebut untuk merefleksikan                       stand-alone    price     to    reflect   the
              kondisi kontrak tertentu.                                     circumstances of the particular contract.

          Untuk modifikasi sewa yang tidak dicatat                     For a lease modification that is not accounted
          sebagai sewa terpisah, pada tanggal efektif                  for as a separate lease, at the effective date of
          modifikasi sewa, penyewa:                                    the lease modification, a lessee shall:

          -   mengalokasikan         imbalan       kontrak              -   allocate the consideration in the modified
              modifikasian;                                                 contract;
          -   menentukan masa sewa dari sewa                            -   determine the lease term of the modified
              modifikasian; dan                                             lease; and
          -   mengukur kembali liabilitas sewa dengan                   -   remeasure the lease liability by discounting
              mendiskontokan       pembayaran        sewa                   the revised lease payments using a revised
              revision menggunakan tingkat diskonto                         discount rate. The revised discount rate is
              revisian.    Tingkat    diskonto    revisian                  determined as the interest rate implicit in
              ditentukan sebagai suku bunga implisit                        the lease for the remainder of the lease
              dalam sewa untuk sisa masa sewa, jika                         term, if that rate can be readily determined,
              dapat ditentukan; atau suku bunga
                                                                            or the lessee’s incremental borrowing rate
              pinjaman inkremental penyewa pada
                                                                            at the effective date of the modification, if
              tanggal efektif modifikasi, jika suku bunga
              implisit dalam sewa tidak dapat ditentukan.                   the interest rate implicit in the lease cannot
                                                                            be readily determined.

          Untuk modifikasi sewa yang tidak dicatat                     For a lease modification that is not accounted
          sebagai sewa terpisah, penyewa mencatat                      for as a separate lease, the lessee shall
          pengukuran kembali liabilitas sewa dengan:                   account for the measurement of the lease
                                                                       liability by:

          -   menurunkan jumlah tercatat aset hak guna                  -   decreasing the carrying amount of the
              untuk merefleksikan penghentian parsial                       right-of-use asset to reflect the partial or full
              atau penuh sewa untuk modifikasi sewa                         termination of the lease for lease
              yang menurunkan ruang lingkup sewa.                           modifications that decrease the scope of
              Penyewa mengakui dalam laba rugi setiap                       the lease. The lessee shall recognise in
              keuntungan atau kerugian yang terkait                         profit or loss any gain or loss relating to the
              dengan penghentian parsial atau penuh                         partial or full termination of the lease.
              sewa tersebut.
          -   membuat penyesuaian terkait dengan aset                   -   making a corresponding adjustment to the
              hak guna untuk seluruh modifikasi sewa                        right-of-use asset for all other lease
              lainnya.                                                      modifications.
Page 42
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/32 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                       NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                              FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                         JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)     (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI       KEBIJAKAN              AKUNTANSI        3.   MATERIAL       ACCOUNTING                      POLICY
     MATERIAL (lanjutan)                                          INFORMATION (continued)

     l.   Biaya pinjaman                                          l.   Borrowing costs

          Biaya bunga dan biaya pinjaman lainnya,                      Interest and other borrowing costs, such as
          seperti biaya diskonto pinjaman baik yang                    discount fees on loans either directly or
          secara langsung atau tidak langsung digunakan                indirectly used in financing the construction of a
          untuk pendanaan konstruksi aset kualifikasian,               qualifying asset, are capitalised up to the date
          dikapitalisasi hingga aset tersebut selesai                  when construction is complete. For borrowings
          dikonstruksi. Untuk biaya pinjaman yang dapat                that are directly attributable to a qualifying
          diatribusikan secara langsung pada aset                      asset, the amount to be capitalised is
          kualifikasian, jumlah yang dikapitalisasi                    determined as the actual borrowing cost
          ditentukan dari biaya pinjaman aktual yang                   incurred during the year, less any income
          terjadi selama tahun berjalan, dikurangi                     earned on the temporary investment of such
          penghasilan yang diperoleh dari investasi                    borrowings. For borrowings that are not directly
          sementara atas dana hasil pinjaman tersebut.                 attributable to a qualifying asset, the amount to
          Untuk pinjaman yang tidak dapat diatribusikan                be capitalised is determined by applying a
          secara langsung pada suatu aset kualifikasian,               capitalisation rate to the amount expended on
          jumlah yang dikapitalisasi ditentukan dengan                 the qualifying assets. The capitalisation rate is
          mengalikan tingkat kapitalisasi terhadap jumlah              the weighted average of the total borrowing
          yang dikeluarkan untuk memperoleh aset                       costs applicable to the total borrowings
          kualifikasian. Tingkat kapitalisasi dihitung                 outstanding during the period, other than
          berdasarkan rata-rata tertimbang biaya                       borrowings made specifically for the purpose of
          pinjaman yang dibagi dengan jumlah pinjaman                  obtaining a qualifying asset.
          yang tersedia selama periode, selain pinjaman
          yang secara spesifik diambil untuk tujuan
          memperoleh suatu aset kualifikasian.

     m. Properti investasi                                        m. Investment properties

          Properti investasi adalah properti (hak atas                 Investment properties are properties (land
          tanah atau bangunan atau bagian dari suatu                   rights or a building or part of a building or both)
          bangunan atau kedua-duanya) yang dikuasai                    held by the owner or the lessee under a finance
          oleh pemilik atau penyewa melalui sewa                       lease to earn rentals or for capital appreciation
          pembiayaan untuk menghasilkan sewa atau                      or both, rather than for use in the production or
          untuk kenaikan nilai atau kedua-duanya, dan                  supply of goods or services or for administrative
          tidak untuk digunakan dalam produksi atau                    purposes; or sale in the daily business
          penyediaan barang atau jasa atau untuk tujuan                activities.
          administratif; atau dijual dalam kegiatan usaha
          sehari-hari.

          Properti investasi diakui sebagai aset jika dan              Investment property is recognised as an asset
          hanya jika besar kemungkinan manfaat                         when, and only when it is probable that the
          ekonomis masa depan yang terkait dengan                      future economic benefits that are associated
          properti investasi akan mengalir ke entitas; dan             with the investment property will flow to the
          biaya perolehan properti investasi dapat diukur              entity; and the cost of the investment property
          dengan andal.                                                can be measured reliably.

          Properti investasi pada awalnya diukur sebesar               An investment property shall be measured
          biaya perolehan, meliputi harga pembelian dan                initially at its cost, comprising its purchase price
          setiap pengeluaran yang dapat diatribusikan                  and any directly attributable expenditure
          secara langsung (biaya jasa hukum, pajak                     (professional fees for legal services, property
          pengalihan properti, dan biaya transaksi lain).              transfer taxes and other transaction costs).
          Biaya transaksi termasuk dalam pengukuran                    Transaction costs are included in the initial
          awal tersebut.                                               measurement.
Page 43
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                               Lampiran 5/33 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                               FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                          JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)      (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI       KEBIJAKAN              AKUNTANSI         3.   MATERIAL       ACCOUNTING                    POLICY
     MATERIAL (lanjutan)                                           INFORMATION (continued)

     m. Properti investasi                                         m. Investment properties

         Setelah pengakuan awal, Grup memilih                          After initial recognition, the Group chooses to
         menggunakan model nilai wajar dan mengukur                    use the fair value model and measure all of its
         seluruh properti investasi berdasarkan nilai                  investment properties at fair value. Any gain or
         wajar. Keuntungan atau kerugian yang timbul                   loss arising from a change in the fair value of
         dari perubahan nilai wajar properti investasi                 investment property is recognised in profit or
         diakui dalam laba rugi pada tahun terjadinya..                loss for the year in which it arises.

         Nilai wajar didasarkan kepada harga pasar                     Fair value is based on active market prices,
         aktif, disesuaikan, jika perlu, dengan perbedaan              adjusted, if necessary, for differences in the
         alam, lokasi atau kondisi dari aset tersebut. Jika            nature, location or condition of the specific
         informasi tersebut tidak tersedia, Grup                       asset. If this information is not available, the
         menggunakan metode penilaian alternatif,                      Group uses alternative valuation methods, such
         seperti harga terbaru di pasar yang kurang aktif              as recent prices on less active markets or
         atau proyeksi arus kas yang didiskontokan.                    discounted cash flow projections.

         Penentuan nilai wajar investasi dilakukan pada                The fair value of investment property as at the
         tanggal posisi keuangan didasarkan pada                       financial position date is based on an annual
         penilaian oleh penilai independen yang                        valuation by an independent valuer who holds a
         mempunyai kualifikasi profesional yang telah                  recognised      and     relevant   professional
         diakui dan relevan serta memiliki pengalaman                  qualification and has recent experience in the
         terkini di lokasi dan kategori properti investasi             location and category of the investment
         yang dinilai. Penilaian ini membentuk dasar                   property being valued. These valuations form
         untuk nilai tercatat pada laporan keuangan                    the basis for the carrying amounts in the
         konsolidasian.                                                consolidated financial statements.

         Properti investasi dihentikan pengakuannya                    Investment properties are derecognised either
         pada saat dilepaskan (pada tanggal penerima                   when they have been disposed of (i.e., at the
         mendapatkan kontrol) atau ketika tidak                        date the recipient obtains control) or when they
         digunakan lagi secara permanen dan tidak                      are permanently withdrawn from use and no
         memiliki manfaat ekonomi masa depan yang                      future economic benefit is expected from their
         diperkirakan dari pelepasannya. Selisih antara                disposal. The difference between the net
         hasil neto pelepasan dan jumlah tercatat aset                 disposal proceeds and the carrying amount of
         diakui dalam laba rugi pada tahun terjadinya                  the asset is recognised in profit or loss in the
         penghentian      atau    pelepasan.     Dalam                 year of derecognition. In determining the
         menentukan nilai pertimbangan dari pelepasan                  amount of consideration from the derecognition
         properti investasi, Grup mempertimbangkan                     of investment property, the Group considers the
         dampak dari variabel pertimbangan, adanya                     effects of variable consideration, the existence
         komponen pembiayaan yang signifikan, dan                      of a significant financing component, non-cash
         pertimbangan utang ke pembeli (jika ada).                     consideration, and consideration payable to the
                                                                       buyer (if any).

         Pengalihan dilaksanakan ke (atau dari) properti               Transfers are made to (or from) investment
         investasi hanya ketika adanya perubahan                       property only when there is a change in use. For
         pemakaian. Untuk pengalihan dari properti                     a transfer from investment property to owner-
         investasi menjadi properti yang ditempati                     occupied property, the deemed cost for
         pemilik, biaya yang dianggap untuk akuntansi                  subsequent accounting is the fair value at the
         selanjutnya adalah nilai wajar pada tanggal                   date of change in use. If owner-occupied
         perubahan pemakaian tersebut. Jika properti                   property becomes an investment property, the
         yang ditempati pemilik menjadi properti                       Group accounts for such property in
         investasi, Grup mengakui properti tersebut                    accordance with the policy stated under
         sesuai dengan kebijakan yang tercantum pada                   property, plant and equipment up to the date of
         aset tetap sampai tanggal perubahan                           change in use.
         pemakaian.
Page 44
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/34 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                             FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                        JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)    (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI       KEBIJAKAN              AKUNTANSI       3.   MATERIAL       ACCOUNTING                     POLICY
     MATERIAL (lanjutan)                                         INFORMATION (continued)

     n.   Aset takberwujud                                       n.   Intangible assets

          Piranti lunak komputer                                      Computer software

          Biaya yang terkait dengan pemeliharaan                      Costs associated with maintaining computer
          program piranti lunak komputer diakui sebagai               software programs are recognised as an
          beban      pada    saat   terjadinya.   Biaya               expense as incurred. Development costs that
          pengembangan yang dapat secara langsung                     are directly attributable to the design and testing
          diatribusikan kepada desain dan pengujian                   of identifiable and unique software products
          produk piranti lunak yang dapat diidentifikasi              controlled by the Group are recognised as
          dan unik yang dikendalikan oleh Grup diakui                 intangible assets. Directly attributable costs are
          sebagai aset takberwujud. Biaya yang dapat                  capitalised as part of the software product
          diatribusikan secara langsung dikapitalisasi                include the software development employee
          sebagai bagian produk piranti lunak mencakup                costs and an appropriate portion of relevant
          beban pekerja pengembang piranti lunak dan                  overheads. Computer software development
          bagian overhead yang relevan. Biaya                         costs recognised as assets are amortised using
          pengembangan piranti lunak komputer diakui                  the straight-line method over their estimated
          sebagai aset yang diamortisasi dengan metode                useful lives of between four to five years.
          garis lurus berdasarkan estimasi masa
          manfaatnya antara 4 sampai dengan 5 tahun.

          Biaya legal terkait pembaruan hak atas tanah                 Legal costs to renew land rights

          Biaya legal terkait dengan pembaruan hak atas                Legal costs related to the renewal of land
          tanah diakui sebagai aset takberwujud dan                    rights are recognised as intangible assets and
          diamortisasi sepanjang umur hak atas tanah                   amortised over the period of the land rights
          antara 20 sampai dengan 30 tahun.                            between 20 to 30 years.

     o.   Biaya dibayar di muka                                  o.    Prepaid expenses

          Biaya dibayar di muka diamortisasi selama                    Prepaid expenses are amortised over the
          periode manfaat dengan menggunakan metode                    periods benefited using the straight-line
          garis lurus.                                                 method.

     p.   Kas dan setara kas                                     p.    Cash and cash equivalents

          Kas dan setara kas termasuk kas, kas di bank,                Cash and cash equivalents consist of cash on
          dan deposito berjangka yang jatuh tempo                      hand, cash in banks and time deposits with
          dalam jangka waktu tiga bulan atau kurang                    maturity periods of three months or less at the
          pada saat penempatan yang tidak digunakan                    time of placement that are not used as collateral
          sebagai   jaminan     atau   tidak   dibatasi                or are not restricted.
          penggunaannya.

          Laporan arus kas konsolidasian disusun                       The consolidated statements of cash flows have
          menggunakan metode langsung dengan                           been prepared using the direct method by
          mengklasifikasikan arus kas berdasarkan                      classifying the cash flows on the basis of
          aktivitas operasi, investasi, dan pendanaan.                 operating, investing, and financing activities.

     q.   Persediaan                                             q.    Inventories

          Persediaan suku cadang, bahan bakar, minyak                  Spare parts, fuel, lubricants, tools and supplies
          pelumas, perlengkapan, dan bahan pendukung                   are valued at cost less a provision for obsolete
          dinilai dengan harga perolehan dikurangi                     and slow-moving inventory. Cost is determined
          dengan provisi persediaan usang dan bergerak                 based on the moving average method. A
          lambat. Harga perolehan ditentukan dengan                    provision for obsolete and slow-moving
          metode rata-rata bergerak. Provisi persediaan                inventory is determined on the basis of
          usang dan bergerak lambat ditentukan                         estimated future usage of individual inventory
          berdasarkan estimasi penggunaan jenis                        items.
          persediaan pada masa mendatang.
Page 45
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                               Lampiran 5/35 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                               FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                          JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)      (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI       KEBIJAKAN               AKUNTANSI        3.   MATERIAL       ACCOUNTING                     POLICY
     MATERIAL (lanjutan)                                           INFORMATION (continued)

     q.   Persediaan (lanjutan)                                    q.   Inventories (continued)

          Persediaan batubara merupakan batubara                         Coal inventory represents the Group’s
          yang menjadi hak Grup dan dinilai berdasarkan                  entitlement to coal on hand and is valued at the
          nilai terendah antara harga perolehan atau nilai               lower of cost or net realisable value. Cost is
          realisasi bersih. Harga perolehan ditentukan                   determined on a moving average basis, which
          dengan metode rata-rata bergerak yang                          includes an appropriate allocation of labour,
          mencakup alokasi komponen tenaga kerja,                        depreciation and overheads related to mining
          penyusutan dan biaya overhead yang berkaitan                   activities. Net realisable value is the estimated
          dengan kegiatan pertambangan. Nilai realisasi                  sales amount in the ordinary course of
          bersih adalah estimasi harga penjualan dalam                   business, less the estimated costs of
          kegiatan usaha biasa dikurangi dengan                          completion and selling expenses.
          estimasi biaya penyelesaian dan beban
          penjualan.

          Penyisihan persediaan batubara usang                           The provision for obsolete coal inventory is
          ditentukan berdasarkan estimasi penjualan                      determined based on estimates of future
          persediaan pada masa mendatang.                                inventory sales.

     r.   Pengakuan pendapatan dan beban                           r.   Revenue and expense recognition

          Pendapatan dari kontrak dengan pelanggan                      Revenue from contracts with customers

          Pengakuan pendapatan harus memenuhi 5                         Revenue recognition has to fulfil 5 (five) steps
          (lima) langkah penilaian sebagai berikut:                     of assessment as follows:

          i.   identifikasi kontrak dengan pelanggan;                   i.     identify contract(s) with a customer;
          ii.  identifikasi kewajiban pelaksanaan dalam                 ii.    identify the performance obligations in the
               kontrak.        Kewajiban       pelaksanaan                     contract. Performance obligations are
               merupakan janji-janji dalam kontrak untuk                       promises in a contract to transfer to a
               menyerahkan barang atau jasa yang                               customer goods or services that are
               memiliki      karakteristik    berbeda    ke                    distinct;
               pelanggan;
          iii. penetapan       harga     transaksi.   Harga             iii.   determine the transaction price. The
               transaksi merupakan jumlah imbalan yang                         transaction price is the amount of
               berhak diperoleh suatu entitas sebagai                          consideration to which an entity expects to
               kompensasi atas diserahkannya barang                            be entitled in exchange for transferring
               atau jasa yang dijanjikan ke pelanggan.                         promised goods or services to a customer.
               Jika imbalan yang dijanjikan di kontrak                         If the consideration promised in a contract
               mengandung suatu jumlah yang bersifat                           includes a variable amount, the Group
               variabel, maka Grup membuat estimasi                            estimates the amount of consideration to
               jumlah imbalan tersebut sebesar jumlah                          which it expects to be entitled in exchange
               yang diharapkan berhak diterima atas                            for transferring the promised goods or
               diserahkannya barang atau jasa yang                             services to a customer less the estimated
               dijanjikan ke pelanggan dikurangi dengan                        amount of service level guarantee which
               estimasi jumlah jaminan kinerja jasa yang                       will be paid during the contract period;
               akan dibayarkan selama periode kontrak;
          iv. alokasi harga transaksi ke setiap                         iv. allocate the transaction price to each
               kewajiban         pelaksanaan        dengan                  performance obligation on the basis of the
               menggunakan dasar harga jual berdiri                         relative stand-alone selling prices of each
               sendiri relatif dari setiap barang atau jasa                 distinct good or service promised in the
               berbeda yang dijanjikan di kontrak. Ketika                   contract. Where these are not directly
               tidak dapat diamati secara langsung, harga                   observable, the relative stand-alone selling
               jual berdiri sendiri relatif diperkirakan                    prices are estimated based on expected
               berdasarkan biaya yang diharapkan                            cost-plus margin; and
               ditambah margin; dan
          v. pengakuan pendapatan ketika kewajiban                      v.     recognise revenue when the performance
               pelaksanaan telah dipenuhi dengan                               obligation is satisfied by transferring a
               menyerahkan barang atau jasa yang                               promised good or service to a customer
               dijanjikan ke pelanggan (ketika pelanggan                       (which is when the customer obtains
               telah memiliki kendali atas barang atau                         control of that good or service).
               jasa tersebut).
Page 46
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/36 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                         NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                           JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)       (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI       KEBIJAKAN               AKUNTANSI         3.   MATERIAL       ACCOUNTING                        POLICY
     MATERIAL (lanjutan)                                            INFORMATION (continued)

     r.   Pengakuan pendapatan dan beban (lanjutan)                 r.   Revenue     and          expense         recognition
                                                                         (continued)

          Pendapatan dari kontrak dengan pelanggan                       Revenue from          contracts   with    customers
          (lanjutan)                                                     (continued)

          Kewajiban pelaksanaan dapat dipenuhi dengan                    A performance obligation may be satisfied at
          cara sebagai berikut:                                          the following:
          -   Pada waktu tertentu (umumnya janji untuk                    - A point in time (typically for promises to
              menyerahkan barang ke pelanggan); atau                          transfer goods to a customer); or
          -   Sepanjang waktu (umumnya janji untuk                        - Over time (typically for promises to transfer
              menyerahkan jasa ke pelanggan). Untuk                           services to a customer). For a performance
              kewajiban pelaksanaan yang dipenuhi                             obligation satisfied over time, the Group
              sepanjang waktu, Grup memilih ukuran                            selects an appropriate measure of
              penyelesaian      yang     sesuai    untuk                      progress to determine the amount of
              penentuan jumlah pendapatan yang harus                          revenue that should be recognised as the
              diakui    karena     telah    terpenuhinya                      performance obligation is satisfied.
              kewajiban pelaksanaan.

          Penjualan tenaga listrik                                       Sale of electricity

          Pendapatan       penjualan       listrik    diakui             Revenue from the sale of electricity is
          berdasarkan pemakaian energi listrik (kWh).                    recognised based on customers’ electricity
          Umumnya, pelanggan dapat membeli token                         usage (kWh). Generally, customers can buy
          mereka sendiri ("prabayar") atau ditagih setiap                their own token (“prepaid”) or are billed monthly
          bulan ("pascabayar"). Untuk pelanggan                          (“postpaid”). For postpaid customers, revenue
          pascabayar, pendapatan dari penjualan listrik                  from the sale of electricity is recognised monthly
          diakui setiap bulan berdasarkan hasil baca                     based on the meter reading result of each
          meter atas pemakaian pelanggan. Untuk                          customer. For prepaid customers, the Group
          pelanggan      prabayar,     Grup        mengakui              recognises the revenue based on the estimated
          pendapatan berdasarkan estimasi jumlah                         usage of the customer during the period. The
          penggunaan token pelanggan pada periode                        prepayment from customers received is
          tertentu. Penerimaan dimuka dari pelanggan                     recorded under other payables.
          telah dicatat pada utang lain-lain.

          Subsidi listrik Pemerintah                                     The Government’s electricity subsidy

          Pendapatan subsidi merupakan pendapatan                        Subsidy revenue represents the revenue from
          dari Pemerintah Indonesia atas selisih antara                  the Government of Indonesia for the difference
          biaya yang diperbolehkan ditambah margin 7%                    between allowable cost plus a 7% margin and
          dengan harga jual aktual per masing-masing                     the actual sales price for each tariff group
          golongan tarif kecuali untuk golongan tarif yang               except for tariff groups for which tariff
          diberlakukan penyesuaian tarif menurut                         adjustments were applied based on Minister of
          Peraturan Menteri Energi dan Sumber Daya                       Energy and Mineral Resources (“ESDM”)
          Alam Mineral (“ESDM”) No. 28 Tahun 2016                        Regulation No. 28 Year 2016 on tariff for
          tentang tarif tenaga listrik yang disediakan oleh              electricity provided by Perusahaan Perseroan
          Perusahaan       Perseroan       (Persero)    PT               (Persero) PT Perusahaan Listrik Negara with
          Perusahaan Listrik Negara sebagaimana                          the latest amendment by Regulation of the
          terakhir diubah dengan Peraturan Menteri                       Minister of ESDM No. 8 Year 2023 (together
          ESDM No. 8 Tahun 2023 (bersama-sama                            referred as “ESDM Regulation on tariff for
          disebut “Peraturan ESDM tentang tarif tenaga                   electricity”).
          listrik”).
Page 47
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                  Lampiran 5/37 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                               FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                          JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)      (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI       KEBIJAKAN               AKUNTANSI        3.   MATERIAL       ACCOUNTING                      POLICY
     MATERIAL (lanjutan)                                           INFORMATION (continued)

     r.   Pengakuan pendapatan dan beban (lanjutan)                r.   Revenue     and        expense        recognition
                                                                        (continued)

          Subsidi listrik Pemerintah (lanjutan)                         The     Government’s        electricity    subsidy
                                                                        (continued)

          Subsidi listrik Pemerintah diakui sebagai                     The Government’s electricity subsidy is
          pendapatan berdasarkan berita acara verifikasi                recognised as revenue based on a monthly
          bulanan dimana tertera berapa jumlah subsidi                  verification report where the amount of subsidy
          yang akan dibayarkan oleh Pemerintah dan                      to be paid by the Government is stated and has
          telah diakui sebagai kewajiban oleh Pemerintah                been recognised as an obligation by the
          Indonesia. Nilai subsidi listrik Pemerintah pada              Government of Indonesia. The Government’s
          akhir tahun perlu diaudit oleh Badan Pemeriksa                electricity subsidy value at the end of the year
          Keuangan (“BPK”).                                             is subject to the Supreme Audit Agency (“BPK”)
                                                                        audit.

          Pendapatan kompensasi                                         Compensation income

          Pendapatan        kompensasi      merupakan                   Compensation income is income from the
          pendapatan dari Pemerintah Indonesia atas                     Government of Indonesia for non-subsidy tariff
          tarif golongan non-subsidi yang tidak                         groups which have not experienced a tariff
          mengalami       perubahan    kenaikan   tarif                 adjustment based on ESDM Regulation on tariff
          berdasarkan Peraturan ESDM tentang tarif                      for electricity.
          tenaga listrik.

          Nilai   kompensasi        merupakan     estimasi              The compensation value is a management
          manajemen yang pada akhir tahun akan direviu                  estimate which at the end of the year will be
          oleh Badan Pengawasan Keuangan dan                            reviewed by the State Development Audit
          Pembangunan (“BPKP”) dan telah diakui                         Agency (“BPKP”) and has been recognised as
          sebagai kewajiban oleh Pemerintah Indonesia.                  an obligation by the Government of Indonesia.
          Nilai kompensasi listrik Pemerintah perlu diaudit             The Government’s electricity compensation
          oleh BPK.                                                     value is subject to the BPK audit.

          Biaya penyambungan pelanggan                                  Customer connection fees

          Grup menganggap biaya penyambungan yang                       The Group views connection fees received from
          diterima dari pelanggan yang digunakan untuk                  customers that are used to construct or acquire
          membangun atau mengakuisisi aset tetap                        property, plant and equipment to connect the
          untuk menghubungkan pelanggan secara tidak                    customers as indirectly related to the promise of
          langsung berkaitan erat dengan pasokan listrik                providing a supply of electricity to the
          kepada pelanggan. Pasokan listrik dan biaya                   customers. Supply of electricity and connection
          penyambungan merupakan satu kesatuan                          fees are not distinct because the customers
          karena pelanggan tidak dapat memperoleh                       cannot benefit from these two services on their
          manfaat dari kedua layanan ini sendiri.                       own. The purpose of the connection
          Infrastruktur penyambungan berfungsi untuk                    infrastructure is to fulfil the obligation to supply
          memenuhi kewajiban penyediaan tenaga listrik                  electricity to the customers. Both the supply of
          kepada pelanggan. Pasokan listrik dan biaya                   electricity and connection fees are substantially
          penyambungan pada dasarnya sama, dan                          the same and have the same pattern of transfer
          memiliki pola transfer yang sama ke pelanggan.                to the customers. Therefore, connection fees
          Oleh karena itu, biaya penyambungan dan                       and the supply of electricity are one
          pasokan tenaga listrik merupakan satu                         performance obligation. As such, connection
          kewajiban pelaksanaan. Dengan demikian,                       fees are recognised as deferred revenue and
          biaya      penyambungan        diakui   sebagai               amortised based on the average useful life of
          pendapatan ditangguhkan dan diamortisasi                      the distribution of assets starting from the
          berdasarkan rata-rata masa manfaat aset                       connection date.
          distribusi terhitung sejak tanggal koneksi.
Page 48
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/38 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                       NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                              FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                         JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)     (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI       KEBIJAKAN              AKUNTANSI        3.   MATERIAL       ACCOUNTING                    POLICY
     MATERIAL (lanjutan)                                          INFORMATION (continued)

     r.   Pengakuan pendapatan dan beban (lanjutan)               r.   Revenue     and       expense       recognition
                                                                       (continued)

          Penjualan batubara                                           Sales of coal

          Pendapatan penjualan diakui pada setiap                      Sales revenue is recognised on each individual
          penjualan individu ketika mengontrol transfer ke             sale when control transfers to the customer.
          pelanggan. Kontrol beralih ke pelanggan dan                  Control passes to the customer and sales
          pendapatan penjualan diakui ketika batu bara                 revenue is recognised when the coal is loaded
          dimuat ke kapal dimana batubara akan dikirim                 onto the vessel on which the coal will be
          ke pelabuhan tujuan atau tempat pelanggan.                   shipped to the destination port or the
                                                                       customer’s premises.

          Grup menjual batubara dengan syarat Free on                  The Group generally sells its coal products
          Board (“FOB”), di mana Grup tidak memiliki                   under Free on Board (“FOB”) terms, where the
          tanggung jawab untuk pengangkutan atau                       Group has no responsibility for freight or
          asuransi setelah kontrol barang telah berlalu di             insurance once control of the goods has passed
          pelabuhan muat. Untuk jangka waktu ini hanya                 at the loading port. For this term there is only
          ada satu kewajiban pelaksanaan, yaitu untuk                  one performance obligation, which is for the
          penyediaan produk pada titik di mana kontrol                 provision of a product at the point where control
          lewat. Selain itu, Grup menjual batubara                     passes. In addition, the Group also sells coal
          dengan syarat Cost, Insurance and Freight                    under Cost, Insurance and Freight (“CIF”)
          (“CIF”),    tetapi   berdasarkan     perjanjian              terms, but under the sales agreement, the title
          penjualan, kepemilikan dan risiko kerugian atas              and risk of loss of coal shall remain with the
          batubara akan tetap berada pada Grup sampai                  Group until such coal passes at the discharging
          batubara melewati pelabuhan bongkar. Oleh                    port. As such, the Group considers that the
          karena itu, Grup menganggap bahwa biaya                      insurance and freight costs are not separate
          asuransi dan pengangkutan bukan merupakan                    performance obligations but one performance
          kewajiban pelaksanaan terpisah melainkan                     obligation with the sale of coal, because the
          satu kesatuan dengan kewajiban pelaksanaan                   control over coal supplies passes to the buyer
          dengan penjualan batubara dikarenakan                        when the coal has arrived at the buyer’s
          kontrol atas persediaan batubara berpindah ke                location. Accordingly, the Group does not have
          pembeli pada saat batubara tersebut sudah                    any separate performance obligations for the
          sampai di lokasi pembeli. Oleh karena itu Grup               transportation and insurance services provided.
          tidak memiliki kewajiban pelaksanaan terpisah
          untuk jasa pengangkutan dan asuransi yang
          disediakan.

          Pelayanan jaringan dan jasa telekomunikasi                   Telecommunication network and service

          Pendapatan biaya jasa bulanan dari pelayanan                 Monthly service fees from telecommunication
          jaringan dan jasa telekomunikasi diakui dalam                network and service revenue are recognised
          suatu periode waktu selama jasa tersebut                     over period of time during the services are
          diberikan.                                                   provided.

          Pendapatan usaha lainnya                                     Other revenues

          Pendapatan      usaha       lainnya  merupakan               Other revenues consist of transformer rental
          pendapatan yang berasal dari sewa trafo dan                  and other administrative services. Revenue
          jasa-jasa administratif lainnya. Pendapatan dari             from providing services is recognised in the
          pemberian jasa diakui pada periode akuntansi                 accounting period in which the services are
          saat jasa tersebut telah diberikan. Untuk                    rendered. For fixed-price contracts, revenue is
          kontrak harga tetap, pendapatan diakui                       recognised based on the actual service
          berdasarkan servis aktual yang diberikan                     provided to the end of the reporting period as a
          hingga akhir periode pelaporan sebagai                       proportion of the total services to be provided
          proporsi dari total servis yang akan diberikan               because the customers received and
          karena pelanggan telah menerima dan                          consumed the benefit simultaneously.
          menggunakan manfaat secara simultan.
Page 49
                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/39 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                       NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                              FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                         JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)     (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI       KEBIJAKAN              AKUNTANSI        3.   MATERIAL       ACCOUNTING                       POLICY
     MATERIAL (lanjutan)                                          INFORMATION (continued)

     r.   Pengakuan pendapatan dan beban (lanjutan)               r.   Revenue     and         expense        recognition
                                                                       (continued)

          Komponen pembiayaan                                          Financing component

          Grup tidak memperkirakan adanya kontrak di                   The Group does not expect to have any
          mana jangka waktu antara pengalihan barang                   contracts where the period between the transfer
          atau jasa yang dijanjikan kepada pelanggan                   of the promised goods or services to the
          dan pembayaran oleh pelanggan melebihi satu                  customer and payment by the customer
          tahun. Akibatnya, Grup tidak menyesuaikan                    exceeds one year. Consequently, the Group
          harga transaksi apa pun dengan nilai waktu                   does not adjust any of the transaction prices for
          uang.                                                        the time value of money.

          Beban                                                        Expenses

          Beban diakui pada saat terjadinya dengan                     Expenses are recognised as incurred on an
          dasar akrual.                                                accrual basis.

     s.   Imbalan kerja                                           s.   Employee benefits

          Kewajiban jangka pendek                                      Short term obligations

          Liabilitas untuk upah dan gaji, termasuk                     Liabilities for wages and salaries, including non-
          imbalan non – moneter dan akumulasi cuti sakit               monetary benefits and accumulating sick leave
          yang akan diselesaikan dalam waktu 12 bulan                  that are expected to be settled wholly within 12
          setelah akhir dari periode ketika pekerja                    months after the end of the period in which the
          memberikan jasa yang berhubungan diakui                      employees render the related service are
          hingga jasa yang diberikan hingga akhir dari                 recognised in respect of employees services up
          periode pelaporan dan dihitung pada jumlah                   to the end of the reporting period and are
          yang diperkirakan akan dibayar ketika liabilitas             measured at the amounts expected to be paid
          diselesaikan. Liabilitas disajikan sebagai                   when the liabilities are settled. The liabilities are
          kewajiban imbalan kerja masa kini pada                       presented as current employee benefit
          neraca.                                                      obligations in the balance sheet.

          Imbalan pascakerja                                           Post-employment benefits

          Skema pensiun diklasifikasikan sebagai                       Pension schemes are classified as either
          program iuran pasti atau program manfaat                     defined contribution plans or defined benefit
          pasti, tergantung pada substansi ekonomi dari                plans, depending on the economic substance of
          syarat dan kondisi utama program tersebut.                   the plan as derived from its principal terms and
          Program iuran pasti adalah program pensiun                   conditions. A defined contribution plan is a
          yang mewajibkan Grup membayar sejumlah                       pension plan under which the Group pays fixed
          iuran tertentu kepada entitas terpisah. Grup                 contributions into a separate entity. The Group
          tidak memiliki kewajiban hukum atau konstruktif              has no legal or constructive obligations to pay
          untuk membayar iuran lebih lanjut jika entitas               further contributions if the fund does not hold
          tersebut tidak memiliki aset yang cukup untuk                sufficient assets to pay all employees the
          membayar seluruh imbalan atas jasa yang                      benefits relating to employee service in the
          diberikan pekerja pada tahun berjalan dan                    current year and prior years. A defined benefit
          tahun-tahun sebelumnya. Program manfaat                      plan is a pension plan that is not a defined
          pasti adalah program pensiun yang bukan                      contribution plan. Typically, defined benefit
          merupakan program iuran pasti. Program                       plans define an amount of pension benefit that
          manfaat pasti adalah program pensiun yang                    an employee will receive upon retirement,
          menentukan jumlah imbalan pensiun yang akan                  usually dependent on one or more factors such
          diterima seorang pekerja pada saat pensiun,                  as age, years of service and compensation.
          biasanya berdasarkan pada satu atau lebih
          faktor seperti usia, masa kerja dan kompensasi.
Page 50
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/40 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                             FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                        JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)    (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI       KEBIJAKAN              AKUNTANSI       3.   MATERIAL       ACCOUNTING                     POLICY
     MATERIAL (lanjutan)                                         INFORMATION (continued)

     s.   Imbalan kerja (lanjutan)                               s.   Employee benefits (continued)

          Imbalan pascakerja (lanjutan)                               Post-employment benefits (continued)

          Grup harus mencadangkan jumlah minimal                      The Group is required to provide a minimum
          imbalan pensiun sesuai dengan Peraturan                     amount of pension benefit in accordance with
          Ketenagakerjaan   atau   Perjanjian  Kerja                  the Manpower Regulations or the Group’s
          Bersama (“PKB”), mana yang lebih tinggi.                    Collective Labour Agreement (the “CLA”),
          Karena Peraturan Ketenagakerjaan atau PKB                   whichever is higher. Since the Manpower
          menentukan rumus tertentu untuk menghitung                  Regulations or the CLA set the formula for
          jumlah minimal imbalan pensiun, pada                        determining the minimum amount of benefits, in
          dasarnya, program pensiun berdasarkan                       substance pension plans under the Manpower
          Peraturan Ketenagakerjaan atau PKB adalah                   Regulations or the CLA represent defined
          program manfaat pasti.                                      benefit plans.

          Sehubungan dengan program manfaat pasti,                    The liability recognised in the consolidated
          liabilitas diakui pada laporan posisi keuangan              statement of financial position in respect of
          konsolidasian setara dengan nilai kini                      defined benefit pension program is equivalent
          kewajiban manfaat pasti pada akhir tahun                    to the present value of the defined benefit
          pelaporan dikurangi nilai wajar aset program.               obligation at the end of the reporting year less
          Kewajiban manfaat pasti dihitung setiap tahun               the fair value of plan assets. The defined benefit
          oleh       aktuaris     independen      dengan              obligation is calculated annually by independent
          menggunakan metode Projected Unit Credit.                   actuaries using the Projected Unit Credit
          Imbalan pascakerja terdiri dari imbalan                     method. Post-employment benefits consist of
          pesangon dan penghargaan purna jabatan.                     severance benefits and employment awards.

          Nilai kini kewajiban manfaat pasti ditentukan               The present value of the defined benefit
          dengan mendiskontokan arus kas keluar yang                  obligation is determined by discounting the
          diestimasi dengan menggunakan tingkat bunga                 estimated future cash outflows using the
          obligasi korporat berkualitas tinggi dalam                  interest rates of high-quality corporate bonds
          denominasi mata uang dimana imbalan akan                    that are denominated in the currency in which
          dibayarkan dan memiliki jangka waktu jatuh                  the benefits will be paid and that have terms of
          tempo mendekati jangka waktu kewajiban                      maturity approximating the terms of the related
          pensiun. Apabila tidak terdapat pasar aktif                 pension obligations. When there is no deep
          untuk obligasi korporat tersebut, digunakan                 market for such bonds, the yields of
          imbal hasil obligasi Pemerintah.                            Government bonds are used.

          Biaya jasa lalu diakui segera dalam laba rugi.              Past service costs are recognised immediately
          Keuntungan dan kerugian atas kurtailmen atau                in profit or loss. Gains or losses on the
          penyelesaian suatu program manfaat pasti                    curtailment or settlement of a defined benefit
          diakui pada saat kurtailmen atau penyelesaian               plan are recognised when the curtailment or
          tersebut terjadi.                                           settlement occurs.

          Pengukuran kembali yang timbul dari                         Remeasurements arising from experience
          penyesuaian pengalaman dan perubahan                        adjustments and changes in actuarial
          asumsi-asumsi aktuarial dibebankan atau                     assumptions are charged or credited to equity
          dikreditkan pada ekuitas dalam laporan                      in the consolidated statement of other
          penghasilan komprehensif lain konsolidasian                 comprehensive income in the year in which they
          pada tahun dimana beban tersebut terjadi.                   arise. The accumulated remeasurements
          Akumulasi      saldo    pengukuran kembali                  balance is reported in retained earnings.
          dilaporkan di saldo laba.
Page 51
                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/41 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                         NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                           JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)       (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI       KEBIJAKAN               AKUNTANSI         3.   MATERIAL       ACCOUNTING                    POLICY
     MATERIAL (lanjutan)                                            INFORMATION (continued)

     s.   Imbalan kerja (lanjutan)                                  s.   Employee benefits (continued)

          Imbalan pascakerja (lanjutan)                                  Post-employment benefits (continued)

          Untuk program iuran pasti, Grup membayar                       For defined contribution plans, the Group pays
          iuran kepada dana pensiun yang dikelola oleh                   contributions to publicly or privately managed
          publik atau swasta. Grup tidak memiliki                        pension plans. The Group has no further
          kewajiban membayar lebih lanjut jika iuran                     payment obligations once the contributions
          tersebut telah dibayarkan. Iuran tersebut diakui               have been paid. The contributions are
          sebagai beban imbalan kerja ketika jatuh                       recognised as employee benefit expenses
          tempo. Iuran dibayar di muka diakui sebagai                    when they become due. Prepaid contributions
          aset sepanjang pengembalian dana atau                          are recognised as an asset to the extent that a
          pengurangan pembayaran masa depan                              cash refund or reduction in the future payments
          dimungkinkan.                                                  is available.

          Pesangon pemutusan kontrak kerja                               Termination benefits

          Pesangon pemutusan kontrak kerja dibayarkan                    Termination benefits are payable when
          ketika pekerja diberhentikan, atau ketika                      employment is terminated by the Group before
          pekerja menerima penawaran mengundurkan                        the normal retirement date, or when an
          diri secara sukarela. Grup mengakui pesangon                   employee accepts voluntary redundancy in
          pemutusan kontrak kerja pada tanggal yang                      exchange for certain benefits. The Group
          lebih dahulu dari: (i) ketika Grup tidak bisa lagi             recognises termination benefits at the earlier of
          membatalkan penawaran pesangon; dan (ii)                       the following dates: (i) when the Group can no
          ketika    Grup      mengakui      biaya     untuk              longer withdraw the offer of those benefits; and
          restrukturisasi yang berada dalam lingkup                      (ii) when the Group recognises costs for a
          PSAK No. 237, “Provisi, Liabilitas Kontinjensi                 restructuring that is within the scope of SFAS
          dan Aset Kontinjensi” dan melibatkan                           No. 237, “Provisions, Contingent Liabilities and
          pembayaran pesangon pemutusan kontrak                          Contingent Assets” and involves the payment of
          kerja. Dalam hal penawaran pengunduran diri                    termination benefits. In the case of an offer
          secara sukarela, pesangon pemutusan kontrak                    made to encourage voluntary redundancy, the
          kerja diukur berdasarkan ekspektasi jumlah                     termination benefits are measured based on the
          karyawan yang menerima penawaran tersebut.                     number of employees expected to accept the
          Pesangon pemutusan kontrak kerja yang jatuh                    offer. Benefits falling due more than 12 months
          tempo lebih dari 12 bulan setelah tanggal                      after the reporting date are discounted to their
          pelaporan didiskontokan ke nilai kini.                         present value.

          Imbalan pemeliharaan kesehatan                                 Health care benefits

          Grup menyediakan imbalan pemeliharaan                          The Group provides health care benefits to its
          kesehatan untuk karyawan yang berhak atas                      employees who are entitled to these benefits.
          imbalan tersebut. Hak atas imbalan ini pada                    The entitlement to these benefits is usually
          umumnya diberikan pada karyawan aktif dan                      granted to both active and retired employees
          pensiunan yang memenuhi masa kerja                             who have fulfilled the minimum service period
          minimum tertentu atau berhenti bekerja karena                  or ceased working due to disability or death.
          cacat atau meninggal dunia. Perkiraan biaya                    The expected costs of these benefits are
          imbalan ini dicadangkan sepanjang masa kerja                   accrued over the years of employment using
          karyawan dengan menggunakan metode                             the same accounting method as used for
          akuntansi yang sama dengan yang digunakan                      defined benefit pension plans. Actuarial gains
          untuk program pensiun imbalan pasti.                           and losses arising from experience adjustments
          Keuntungan dan kerugian aktuarial yang timbul                  and changes in actuarial assumptions are
          dari penyesuaian pengalaman dan perubahan                      charged or credited to equity in other
          asumsi aktuarial dibebankan atau dikreditkan                   comprehensive income in the period they arise.
          ke ekuitas di penghasilan komprehensif lain
          pada periode saat terjadinya.
Page 52
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/42 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                             FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                        JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)    (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI       KEBIJAKAN              AKUNTANSI       3.   MATERIAL       ACCOUNTING                     POLICY
     MATERIAL (lanjutan)                                         INFORMATION (continued)

     s.   Imbalan kerja (lanjutan)                               s.   Employee benefits (continued)

          Imbalan kerja jangka panjang lainnya                        Other long-term benefits

          Grup memberikan imbalan pascakerja lainnya                  The Group provides other long-term employee
          seperti uang cuti besar, tunjangan kecelakaan               benefits such as a long leave allowance,
          dinas, bantuan kematian, dan penghargaan                    disability benefit, death benefit, and loyalty
          kesetiaan kerja. Nilai imbalan yang diberikan               benefit. The benefits paid are based on the
          didasari pada Perjanjian Kerja Bersama.                     Group’s CLA.

          Cuti besar diberikan kepada karyawan yang                   The long leave allowance is given to employees
          telah bekerja sekurang-kurangnya enam tahun                 who have worked for at least six years
          terus menerus. Tunjangan kecelakaan dinas                   continuously. The disability benefit is provided
          diberikan kepada karyawan yang mengalami                    to employees who have a work accident. The
          kecelakaan dinas. Bantuan kematian diberikan                death benefit is provided to the heirs whether or
          kepada ahli waris bagi karyawan yang                        not the employee passes away as a result of a
          meninggal dunia akibat kecelakaan kerja                     work accident. The loyalty benefit is given every
          maupun tidak. Penghargaan kesetiaan kerja                   eight years for employees who have worked for
          diberikan setiap delapan tahun bagi pegawai                 16 years continuously.
          yang telah bekerja selama 16 tahun terus
          menerus.

          Perhitungan imbalan kerja jangka panjang                    Long-term benefits are determined using the
          ditentukan dengan menggunakan metode                        Projected Unit Credit Method. The long-term
          Projected Unit Credit. Jumlah yang diakui                   employee benefits liabilities recognised in the
          sebagai liabilitas imbalan kerja jangka panjang             consolidated statement of financial position
          di laporan posisi keuangan konsolidasian                    represent the present value of the defined
          merupakan nilai kini liabilitas imbalan kerja               benefit obligation.
          pasti.

     t.   Provisi                                                t.   Provisions

          Provisi     restorasi    lingkungan,     biaya              Provision for environmental restoration,
          restrukturisasi dan tuntutan hukum diakui                   restructuring costs and legal claims is
          ketika: Grup memiliki kewajiban hukum atau                  recognised when: the Group has a present legal
          konstruktif masa kini sebagai akibat peristiwa              or constructive obligation as a result of past
          masa lalu; terdapat kemungkinan besar                       events; it is probable that an outflow of
          penyelesaian          kewajiban       tersebut              resources will be required to settle the
          mengakibatkan arus keluar sumber daya; dan                  obligation; and the amount has been reliably
          jumlah kewajiban tersebut dapat diukur secara               estimated. Provision is not recognised for future
          andal. Provisi tidak diakui untuk kerugian                  operating losses.
          operasi masa depan.

          Ketika terdapat beberapa kewajiban yang                     Where there are a number of similar
          serupa,      kemungkinan        penyelesaian                obligations, the likelihood that an outflow will be
          mengakibatkan arus keluar ditentukan dengan                 required in settlement is determined by
          mempertimbangkan kelas kewajiban secara                     considering the class of obligations as a whole.
          keseluruhan.    Provisi  diakui    walaupun                 A provision is recognised even if the likelihood
          kemungkinan adanya arus keluar sehubungan                   of an outflow with respect to any one item
          dengan item manapun yang termasuk dalam                     included in the same class of obligations may
          kelas kewajiban yang sama mungkin kecil.                    be small.
Page 53
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/43 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                             FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                        JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)    (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI       KEBIJAKAN              AKUNTANSI       3.   MATERIAL       ACCOUNTING                     POLICY
     MATERIAL (lanjutan)                                         INFORMATION (continued)

     t.   Provisi (lanjutan)                                     t.   Provisions (continued)

          Provisi diukur sebesar nilai kini dari estimasi             Provisions are measured at the present value of
          terbaik manajemen atas pengeluaran yang                     management’s best estimate of the expenditure
          diharapkan diperlukan untuk menyelesaikan                   required to settle the present obligation at the
          kewajiban kini pada akhir periode pelaporan.                end of the reporting period. The discount rate
          Tingkat diskonto yang digunakan untuk                       used to determine the present value is a pretax
          menentukan nilai kini adalah tingkat diskonto               rate that reflects current market assessments of
          sebelum pajak yang mencerminkan penilaian                   the time value of money and the risks specific
          pasar atas nilai waktu uang dan risiko yang                 to the liability. The increase in the provision due
          terkait dengan kewajiban. Peningkatan provisi               to the passage of time is recognised as interest
          karena berjalannya waktu diakui sebagai beban               expense.
          bunga.

     u.   Piutang                                                u.   Receivables

          Piutang usaha merupakan jumlah yang dapat                   Trade receivables represent amounts due from
          diterima dari pelanggan atas penjualan tenaga               customers for sales of electricity, primary
          listrik, energi primer dan jasa dalam kegiatan              energy and services in the normal course of
          usaha normal. Piutang lain-lain merupakan                   business.    Other      receivables    represent
          saldo piutang yang tidak terkait dengan                     receivables that are not related to the normal
          kegiatan usaha normal Grup. Jika piutang                    business activities of the Group. If receivables
          diperkirakan dapat ditagih dalam waktu satu                 are expected to be collected within one year or
          tahun atau kurang, piutang diklasifikasikan                 less, they are classified as current assets.
          sebagai aset lancar. Jika tidak, piutang                    Otherwise, the receivables are presented as
          disajikan sebagai aset tidak lancar pada                    non-current assets in the consolidated
          laporan posisi keuangan konsolidasian.                      statement of financial position.

          Piutang usaha pada awalnya diakui sebesar                   Trade receivables are recognised initially at fair
          nilai wajar dan kemudian diukur sebesar biaya               value and subsequently measured at amortised
          perolehan diamortisasi dengan menggunakan                   cost using the effective interest method, if the
          metode suku bunga efektif, jika efek                        impact of discounting is significant, less any
          pendiskontoan signifikan, dikurangi dengan                  loss allowance.
          cadangan kerugian.

          Kerugian penurunan nilai piutang disajikan                  Impairment losses on receivables are
          sebagai bagian dari beban usaha pada laba                   presented as part of operating expenses in
          rugi. Jumlah yang selanjutnya dapat dipulihkan              profit or loss. Subsequent recoveries of
          kembali atas piutang yang sebelumnya telah                  amounts previously written off are credited
          dihapusbukukan, dikreditkan terhadap item                   against the same line item.
          baris yang sama.

          Piutang pihak berelasi pada awalnya disajikan               Receivables from related parties are initially
          sebagai aset tidak lancar kecuali jika ada                  presented as non-current assets unless there
          alasan tertentu untuk disajikan sebagai aset                are specific reasons for them to be presented
          lancar pada laporan posisi keuangan                         as current assets in the consolidated
          konsolidasian.                                              statements of financial position.

          Lihat Catatan 3.g untuk informasi lebih lanjut              See Note 3.g for further information regarding
          mengenai     kebijakan   penentuan     jumlah               the policy on the determination of the amount
          cadangan kerugian piutang Grup.                             for the loss allowance on the Group’s
                                                                      receivables.
Page 54
                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/44 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                          NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                 FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                            JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)        (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI       KEBIJAKAN                AKUNTANSI         3.   MATERIAL       ACCOUNTING                     POLICY
     MATERIAL (lanjutan)                                             INFORMATION (continued)

     v.   Pajak penghasilan                                          v.   Income tax

          Beban pajak terdiri dari pajak kini dan pajak                   Tax expense comprises current and deferred
          tangguhan. Pajak diakui dalam laba rugi,                        tax. Tax is recognised in profit or loss, except to
          kecuali jika pajak itu terkait dengan kejadian                  the extent that it relates to items recognised in
          atau transaksi yang diakui di penghasilan                       other comprehensive income or directly in
          komprehensif lain atau langsung diakui ke                       equity. In this case, the tax expense is
          ekuitas. Dalam hal ini, beban pajak tersebut                    recognised in other comprehensive income or
          masing-masing diakui pada penghasilan                           directly in equity, respectively.
          komprehensif lain atau secara langsung dicatat
          ke ekuitas.

          Beban pajak kini dihitung berdasarkan                           The current income tax charge is calculated on
          peraturan perpajakan yang berlaku pada                          the basis of the tax laws enacted as at the
          tanggal pelaporan keuangan. Manajemen                           reporting date. Management periodically
          secara periodik mengevaluasi posisi yang                        evaluates the positions taken in Annual Tax
          diambil dalam Surat Pemberitahuan Tahunan                       Returns with respect to situations in which the
          sehubungan dengan situasi dimana aturan                         applicable tax regulations are subject to
          pajak yang berlaku membutuhkan interpretasi                     interpretation. It establishes a provision where
          atas peraturan pajak yang berlaku. Jika perlu,                  appropriate on the basis of the amounts
          manajemen menentukan provisi dibentuk                           expected to be paid to the tax authorities.
          berdasarkan jumlah yang diharapkan akan
          dibayar pada otoritas pajak.

          Untuk pendapatan yang menjadi subjek pajak                      For income which is subject to final tax, tax
          penghasilan final, beban pajak diakui secara                    expenses are recognised proportionally with the
          proporsional dengan jumlah pendapatan                           accounting revenue recognised and presented
          akuntansi yang diakui dan disajikan dalam                       as part of the operating expenses account in the
          sebagai bagian dari akun beban operasional                      current year as such tax does not satisfy the
          pada tahun berjalan dikarenakan pajak tersebut                  criteria of income tax.
          tidak memenuhi kriteria sebagai pajak
          penghasilan.

          Pajak penghasilan tangguhan diakui, dengan                      Deferred income tax is recognised, using the
          menggunakan metode liabilitas untuk semua                       liability method, on temporary differences
          perbedaan temporer antara dasar pengenaan                       arising between the tax bases of assets and
          pajak aset dan liabilitas dengan nilai tercatatnya              liabilities and their carrying amounts in the
          pada laporan keuangan konsolidasian. Namun,                     consolidated financial statements. However,
          liabilitas pajak tangguhan tidak diakui jika timbul             deferred tax liabilities are not recognised if they
          dari pengakuan awal goodwill; atau pada saat                    arise from the initial recognition of goodwill; or
          pengakuan awal suatu aset atau liabilitas yang                  deferred income tax is not accounted for if it
          timbul dari transaksi selain kombinasi bisnis                   arises from the initial recognition of an asset or
          yang pada saat transaksi tersebut tidak                         liability in a transaction other than a business
          mempengaruhi laba rugi akuntansi maupun                         combination that at the time of the transaction
          laba rugi kena pajak. Pajak penghasilan                         affects neither accounting nor taxable profit or
          tangguhan ditentukan menggunakan tarif dan                      loss. Deferred income tax is determined using
          peraturan pajak yang berlaku atau yang secara                   the tax rates and laws that have been enacted
          substansial telah berlaku pada akhir tahun                      or substantially enacted at the end of the
          pelaporan dan diharapkan diterapkan jika aset                   reporting year and are expected to apply when
          pajak penghasilan tangguhan direalisasikan                      the related deferred income tax asset is realised
          atau liabilitas pajak tangguhan diselesaikan.                   or the deferred income tax liability is settled.
Page 55
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/45 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                       NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                              FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                         JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)     (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI       KEBIJAKAN              AKUNTANSI        3.   MATERIAL       ACCOUNTING                     POLICY
     MATERIAL (lanjutan)                                          INFORMATION (continued)

     v.   Pajak penghasilan (lanjutan)                            v.   Income tax (continued)

          Aset pajak penghasilan tangguhan diakui                      Deferred income tax assets are recognised only
          hanya jika besar kemungkinan jumlah                          to the extent that it is probable that future
          penghasilan kena pajak di masa depan akan                    taxable profits will be available against which
          memadai     untuk   dikompensasi   dengan                    the temporary differences can be utilised.
          perbedaan temporer yang masih dapat
          digunakan.

          Aset dan liabilitas pajak tangguhan tidak diakui             Deferred tax assets and liabilities are not
          untuk perbedaan temporer antara nilai tercatat               recognised for temporary differences between
          dan dasar pengenaan pajak atas dalam ventura                 the carrying amount and tax bases of
          bersama dan asosiasi dimana Grup dapat                       investments in joint ventures and associates
          mengendalikan waktu pembalikan perbedaan                     where the Group is able to control the timing of
          temporer dan kemungkinan perbedaan                           the reversal of the temporary differences and it
          tersebut tidak akan dibalik di masa mendatang.               is probable that the differences will not be
                                                                       reversed in the foreseeable future.

          Aset dan liabilitas pajak penghasilan tangguhan              Deferred income tax assets and liabilities are
          dapat saling hapus jika terdapat hak yang                    offset when there is a legally enforceable right
          berkekuatan secara hukum untuk melakukan                     to offset current tax assets against current tax
          saling hapus antara aset pajak kini dengan                   liabilities.
          liabilitas pajak kini.

     w. Laba per saham                                            w. Earnings per share

          Laba per saham dasar dihitung dengan                         Basic earnings per share is calculated by
          membagi laba yang dapat diatribusikan kepada                 dividing the profit attributable to the equity
          pemegang saham Perusahaan dengan jumlah                      holders of the Company by the weighted
          rata-rata tertimbang saham biasa yang beredar                average number of ordinary shares outstanding
          pada tahun berjalan.                                         for the year.

          Laba per saham dilusian dihitung dengan                      Diluted earnings per share is calculated by
          menyesuaikan rata-rata tertimbang jumlah                     adjusting the weighted average number of
          saham    biasa     yang   beredar  untuk                     ordinary shares outstanding to assume the
          mengasumsikan konversi seluruh potensi                       conversion of all dilutive potential ordinary
          saham biasa yang dilutif.                                    shares.

     x.   Informasi segmen                                        x.   Segment information

          Segmen operasi diidentifikasi berdasarkan                    Operating segments are identified on the basis of
          laporan internal mengenai komponen dari Grup                 internal reports about components of the Group
          yang secara reguler direviu oleh “pengambil                  and are regularly reviewed by the “chief operating
          keputusan     operasional”   dalam   rangka                  decision maker” in order to allocate resources to
          mengalokasikan sumber daya dan menilai                       the segments and to assess their segment
          kinerja segmen operasi.                                      operation performance.

          Informasi yang digunakan oleh pengambil                      Information reported to the chief operating
          keputusan operasional dalam rangka alokasi                   decision maker for the purposes of resource
          sumber daya dan penilaian kinerja mereka                     allocation and assessment of their performance
          dikategorikan berdasarkan lokasi geografis di                is grouped based on the geographical location
          mana penjualan tenaga listrik dilakukan.                     where electricity sales are made.
Page 56
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                               Lampiran 5/46 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                               FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                          JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)      (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI       KEBIJAKAN               AKUNTANSI        3.   MATERIAL       ACCOUNTING                        POLICY
     MATERIAL (lanjutan)                                           INFORMATION (continued)

     y.   Properti pertambangan                                    y.   Mining properties

          Biaya pengembangan yang dikeluarkan oleh                      Development expenditure incurred by or on
          atau atas nama Grup diakumulasikan secara                     behalf of the Group is accumulated separately
          terpisah untuk setiap area of interest pada saat              for each area of interest in which economically
          cadangan terpulihkan yang secara ekonomis                     recoverable resources have been identified.
          dapat diidentifikasi. Biaya tersebut termasuk                 Such expenditure includes costs directly
          biaya yang dapat diatribusikan secara langsung                attributable to the construction of mines and
          pada konstruksi tambang dan infrastruktur terkait             related infrastructure and excludes physical
          dan tidak termasuk biaya aset berwujud dan hak                assets and land rights (i.e., right to build, right to
          atas tanah (seperti hak guna bangunan, hak guna               cultivate and right to use), which are recorded
          usaha, dan hak pakai) yang dicatat sebagai aset               as fixed assets.
          tetap.

     z.   Pinjaman                                                 z.   Borrowings

          Pada saat pengakuan awal, pinjaman diakui                     Borrowings are recognised initially at fair value,
          sebesar nilai wajar, dikurangi dengan biaya-biaya             net of transaction costs incurred. Borrowings
          transaksi yang terjadi. Selanjutnya, pinjaman                 are subsequently carried at amortised cost; any
          diukur sebesar biaya perolehan diamortisasi;                  difference between the proceeds (net of
          selisih antara penerimaan (dikurangi biaya                    transaction costs) and the redemption value is
          transaksi) dan nilai pelunasan dicatat pada                   recognised in the profit or loss over the period
          laporan laba rugi selama periode pinjaman                     of the borrowings using the effective interest
          dengan menggunakan metode bunga efektif.                      method.

          Biaya yang dibayar untuk memperoleh fasilitas                 Fees paid on the establishment of loan facilities
          pinjaman diakui sebagai biaya transaksi                       are recognised as transaction costs of the loan
          pinjaman sepanjang besar kemungkinan                          to the extent that it is probable that some or all
          sebagian atau seluruh fasilitas akan ditarik.                 of the facility will be drawn down. In this case,
          Dalam hal ini, biaya memperoleh pinjaman                      the fee is deferred until the draw-down occurs.
          ditangguhkan sampai penarikan pinjaman terjadi.               To the extent that there is no evidence that it is
          Sepanjang tidak terdapat bukti bahwa besar                    probable that some or all of the facility will be
          kemungkinan sebagian atau seluruh fasilitas                   drawn down, the fee is capitalised as a pre-
          akan ditarik, biaya memperoleh pinjaman                       payment for liquidity services and amortised
          dikapitalisasi sebagai pembayaran di muka untuk               over the period of the facility to which it relates.
          jasa likuiditas dan diamortisasi selama periode
          fasilitas yang terkait.

          Pinjaman akan dihentikan pengakuannya dari                    Borrowings are derecognised from the
          laporan posisi keuangan ketika kewajiban yang                 statement of financial position when the
          tertulis pada kontrak diselesaikan, dibatalkan,               obligation specified in the contract is
          atau sudah tidak berlaku. Selisih antara nilai                discharged, cancelled or expired. The
          tercatat dari liabilitas keuangan yang sudah                  difference between the carrying amount of a
          berakhir atau dialihkan ke pihak lain dan                     financial liability that has been extinguished or
          imbalan yang dibayarkan, termasuk aset non-                   transferred to another party and the
          kas yang dialihkan atau liabilitas yang                       consideration paid, including any non-cash
          ditanggung, diakui dalam laba rugi sebagai                    assets transferred or liabilities assumed, is
          pendapatan lain-lain atau biaya keuangan.                     recognised in profit or loss as other income or
                                                                        finance costs.
Page 57
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                               Lampiran 5/47 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                               FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                          JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)      (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI       KEBIJAKAN               AKUNTANSI        3.   MATERIAL       ACCOUNTING                      POLICY
     MATERIAL (lanjutan)                                           INFORMATION (continued)

     z.   Pinjaman (lanjutan)                                      z.   Borrowings (continued)

          Pinjaman diklasifikasikan sebagai liabilitas                  Loans are classified as current liabilities unless
          jangka pendek kecuali Grup memiliki hak untuk                 the Group has a right to defer payment of the
          menunda pembayaran liabilitas selama paling                   liability for at least 12 months after the reporting
          tidak 12 bulan setelah tanggal pelaporan.                     date.

          Kovenan yang harus dipatuhi oleh Grup, pada                   Covenants that the Group is required to comply
          atau     sebelum    akhir      tahun   pelaporan,             with, on or before the end of the reporting year,
          dipertimbangkan dalam mengklasifikasikan                      are     considered      in   classifying     loan
          perjanjian pinjaman dengan perjanjian sebagai                 arrangements with covenants as current or
          lancar atau tidak lancar. Kovenan yang harus                  non-current. Covenants that the Group is
          dipatuhi oleh Grup setelah tahun pelaporan tidak              required to comply with after the reporting
          mempengaruhi       klasifikasi    pada    tanggal             period do not affect the classification at the
          pelaporan.                                                    reporting date.


4.   PERTIMBANGAN AKUNTANSI PENTING DAN                       4.   CRITICAL ACCOUNTING JUDGEMENTS AND
     ESTIMASI AKUNTANSI SIGNIFIKAN                                 SIGNIFICANT ACCOUNTING ESTIMATES

     Dalam rangka penerapan kebijakan akuntansi Grup,              In the application of the Group’s accounting policies,
     sebagaimana dijelaskan dalam Catatan 3,                       which are described in Note 3, the management is
     manajemen         diharuskan      untuk    membuat            required to make judgements, estimates, and
     pertimbangan, estimasi, dan asumsi tentang nilai              assumptions about the carrying amounts of assets
     aset dan liabilitas yang tidak tersedia dari sumber           and liabilities that are not readily apparent from other
     lain. Estimasi dan asumsi berdasarkan pengalaman              sources.       The     estimates      and    associated
     historis dan faktor lain yang dianggap relevan. Hasil         assumptions are based on historical experience and
     aktual dapat berbeda dari estimasi tersebut.                  other factors that are considered relevant. Actual
                                                                   results may differ from these estimates.

     Estimasi dan asumsi yang mendasari direviu secara             The estimates and underlying assumptions are
     berkelanjutan. Revisi terhadap estimasi akuntansi             reviewed on an ongoing basis. Revisions to
     akan diakui pada tahun dimana estimasi tersebut               accounting estimates are recognised in the year in
     direvisi, jika revisi tersebut hanya berpengaruh              which the estimate is revised if the revision affects
     terhadap tahun tersebut, atau pada tahun revisi dan           only that year, or in the year of the revision and
     tahun berikutnya jika revisi tersebut mempengaruhi            future years if the revision affects both current and
     tahun tersebut.                                               future years.

     Pertimbangan    penting        dalam      penerapan           Critical judgements in applying accounting
     kebijakan akuntansi                                           policies

     Dalam proses penerapan kebijakan akuntansi yang               In the process of applying the accounting policies
     dijelaskan dalam Catatan 3, Grup telah menentukan             described in Note 3, the Group has identified the
     hal-hal berikut yang memerlukan pertimbangan                  following   matters   under which       significant
     signifikan:                                                   judgements are made:

     Penentuan umur sewa                                           Determining lease term

     Penentuan apakah suatu perjanjian mengandung                  Determining whether an arrangement is or contains
     unsur sewa membutuhkan pertimbangan yang                      a lease requires careful judgement to assess
     cermat untuk menilai apakah perjanjian tersebut               whether the arrangement conveys a right to obtain
     memberikan hak untuk mendapatkan secara                       substantially all the economic benefits from use of
     substansial seluruh manfaat ekonomis dari                     the asset throughout the period of use and right to
     penggunaan aset identifikasian dan hak untuk                  direct the use of the asset, even if the right is not
     mengarahkan penggunaan aset identifikasian,                   explicitly specified in the arrangement.
     bahkan jika hak tersebut tidak dijabarkan secara
     eksplisit di perjanjian.
Page 58
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/48 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                             FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                        JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)    (Expressed in millions of Rupiah, unless otherwise stated)

4.   PERTIMBANGAN AKUNTANSI PENTING DAN                     4.   CRITICAL ACCOUNTING JUDGEMENTS AND
     ESTIMASI AKUNTANSI SIGNIFIKAN (lanjutan)                    SIGNIFICANT  ACCOUNTING   ESTIMATES
                                                                 (continued)

     Pertimbangan    penting      dalam       penerapan          Critical judgements in applying accounting
     kebijakan akuntansi (lanjutan)                              policies (continued)

     Penentuan umur sewa (lanjutan)                              Determining lease term (continued)

     Dalam menentukan jangka waktu sewa, Grup                    In determining the lease term, Group considers all
     mempertimbangkan semua fakta dan keadaan yang               facts and circumstances that create an economic
     menimbulkan insentif ekonomi untuk menggunakan              incentive to exercise an extension option, or not
     opsi perpanjangan, atau tidak menggunakan opsi              exercise a termination option. Extension options (or
     penghentian. Opsi perpanjangan (atau tahun                  years after termination options) are only included in
     setelah opsi penghentian kontrak kerja) hanya               the lease term if the lease is reasonably certain to
     termasuk dalam jangka waktu sewa jika cukup pasti           be extended (or not terminated). The lease term is
     akan diperpanjang (atau tidak dihentikan). Umur             reassessed if an option is actually exercised (or not
     sewa dinilai kembali ketika opsi sebenarnya diambil         exercised) or the group becomes obliged to exercise
     (atau tidak diambil) atau grup menjadi berkewajiban         (or not exercise) it. The assessment of reasonable
     untuk mengambil (atau tidak mengambil) opsi                 certainty is only revised if a significant event or a
     tersebut. Penilaian kepastian yang wajar hanya              significant change in circumstances occurs, which
     direvisi ketika peristiwa signifikan atau perubahan         affects this assessment, and that is within the control
     signifikan terjadi, yang mempengaruhi penilaian ini,        of the lessee.
     dan hal tersebut dalam pengendalian penyewa.

     Pendapatan dari jasa penyambungan pelanggan                 Revenues from customer connection fees

     Sebagai bagian dari implementasi PSAK No. 115,              As a result of the implementation of SFAS No. 115,
     Grup telah menilai kembali perlakuan yang                   the Group has reassessed its treatment of revenue
     diterapkan pendapatan dari penyambungan                     from customer connection fees. The Group has
     pelanggan. Grup mempertimbangkan semua fakta                considered all relevant facts and circumstances to
     dan kondisi yang relevan untuk menentukan                   determine the exact timing of revenue recognition
     pengakuan       pendapatan       terkait    biaya           pertaining to connection fees paid by customers. To
     penyambungan pelanggan. Untuk itu, Grup perlu               do so, the Group needs to determine what
     menentukan kewajiban pelaksanaan yang timbul                performance obligations it has as a result of
     sehubungan      dengan      penerimaan      biaya           receiving connection fees. The Group considered
     penyambungan       dari      pelanggan.     Grup            the fact that the obligation to provide an ongoing
     mempertimbangkan fakta bahwa kewajiban untuk                supply of electricity is regulated by the 2009
     menyediakan tenaga listrik secara berkelanjutan             Electricity Law and that the Group charges all
     diatur dalam Undang-Undang Ketenagalistrikan                customers the same regulated tariff for electricity
     tahun 2009 dan semua pelanggan dikenakan tarif              usage prescribed by the Government of the
     listrik yang telah ditentukan oleh Pemerintah               Republic of Indonesia. The receipt of connection
     Republik Indonesia untuk penggunaan tenaga                  fees creates an obligation for the Group to provide
     listrik.  Penerimaan     biaya     penyambungan             ongoing electricity supply to its customers. The
     menimbulkan kewajiban bagi Grup untuk                       Group has concluded that connecting the customers
     menyediakan akses listrik secara berkelanjutan              to its network is an obligation which cannot be
     kepada pelanggan. Grup menyimpulkan bahwa                   separated from the delivery of electricity.
     menghubungkan pelanggan ke jaringan listrik
     Perusahaan merupakan kewajiban yang tidak
     terpisah dengan penyediaan tenaga listrik kepada
     pelanggan.
Page 59
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                               Lampiran 5/49 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                       NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                              FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                         JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)     (Expressed in millions of Rupiah, unless otherwise stated)

4.   PERTIMBANGAN AKUNTANSI PENTING DAN                      4.   CRITICAL ACCOUNTING JUDGEMENTS AND
     ESTIMASI AKUNTANSI SIGNIFIKAN (lanjutan)                     SIGNIFICANT  ACCOUNTING   ESTIMATES
                                                                  (continued)

     Pertimbangan    penting      dalam        penerapan          Critical judgements in applying accounting
     kebijakan akuntansi (lanjutan)                               policies (continued)

     Kepentingan dalam pengaturan bersama                         Interest in joint arrangements

     Pertimbangan diperlukan untuk menentukan ketika              Judgement is required to determine when the Group
     Grup memiliki pengendalian bersama, yang                     has joint control, which requires an assessment of
     membutuhkan penilaian mengenai aktivitas yang                the relevant activities and when the decisions in
     relevan dan ketika keputusan yang berkaitan                  relation to those activities require unanimous
     dengan     aktivitas   tersebut    membutuhkan               consent. The Group has determined that the
     persetujuan dengan suara bulat. Grup menentukan              relevant activities for its joint arrangements are
     bahwa aktivitas yang relevan untuk pengaturan                those relating to the operating and capital decisions
     bersama adalah aktivitas yang berkaitan dengan               of the arrangement.
     operasi dan pengambilan keputusan dalam
     pengaturan tersebut.

     Pertimbangan       juga       diperlukan     untuk           Judgement is also required to classify a joint
     mengklasifikasikan pengaturan bersama sebagai                arrangement as either a joint operation or a joint
     pengendalian bersama atau ventura bersama.                   venture. Classifying the arrangement requires the
     Pengklasifikasian       pengaturan        tersebut           Group to assess its rights and obligations arising
     mengharuskan Grup untuk menilai hak dan                      from the arrangement. Specifically, it considers:
     kewajiban yang timbul dari pengaturan tersebut.
     Secara khusus, Grup mempertimbangkan:
     • Struktur dari pengaturan bersama - apakah                  •   The structure of the joint arrangement - whether
        dibentuk melalui kendaraan terpisah;                          it is structured through a separate vehicle;
     • Ketika pengaturan tersebut terstruktur melalui             •   When the arrangement is structured through a
        kendaraan        terpisah,       Grup       juga              separate vehicle, the Group also considers the
        mempertimbangkan hak dan kewajiban yang                       rights and obligations arising from:
        timbul dari:
        - bentuk legal dari kendaraan terpisah;                       -   the legal form of the separate vehicle;
        - persyaratan dari perjanjian kontraktual; dan                -   the terms of the contractual arrangement; and
                                                                      -   other facts and circumstances (when
        -   fakta dan kondisi lain (ketika relevan).                      relevant).

     Penilaian ini sering membutuhkan pertimbangan                This assessment often requires significant
     yang signifikan. Kesimpulan yang berbeda                     judgement. A different conclusion on joint control
     mengenai pengendalian bersama dan apakah suatu               and also whether the arrangement is a joint
     pengaturan adalah sebuah operasi bersama atau                operation or a joint venture, may materially impact
     ventura bersama, dapat memiliki dampak material              the consolidated financial statements.
     terhadap laporan keuangan konsolidasian.

     Grup memiliki pengaturan bersama yang terstruktur            The Group has joint arrangements which are
     melalui ventura bersama, lihat Catatan 9 untuk               structured through joint ventures, see Note 9 for the
     daftar ventura bersama tersebut. Struktur dan                list of joint ventures. These structures and the terms
     persyaratan       dari     perjanjian     kontraktual        of the contractual arrangements indicate that the
     mengindikasikan bahwa Grup memiliki hak atas                 Group has rights to the net assets of the
     aset bersih dari pengaturan bersama tersebut. Grup           arrangements. The Group has also assessed the
     menilai fakta dan kondisi lain yang berkaitan dengan         other facts and circumstances relating to these
     pengaturan ini dan menyimpulkan bahwa                        arrangements and concluded that the arrangements
     pengaturan tersebut merupakan ventura bersama.               are joint ventures.
Page 60
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/50 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                             FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                        JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)    (Expressed in millions of Rupiah, unless otherwise stated)

4.   PERTIMBANGAN AKUNTANSI PENTING DAN                     4.   CRITICAL ACCOUNTING JUDGEMENTS AND
     ESTIMASI AKUNTANSI SIGNIFIKAN (lanjutan)                    SIGNIFICANT  ACCOUNTING   ESTIMATES
                                                                 (continued)

     Sumber ketidakpastian estimasi                              Sources of estimation uncertainty

     Asumsi utama mengenai masa depan dan sumber                 The key assumptions concerning future and other
     estimasi lainnya pada akhir tahun pelaporan, yang           key sources of estimation at the end of the reporting
     memiliki risiko signifikan yang mengakibatkan               year, which have a significant risk of causing a
     penyesuaian material terhadap jumlah tercatat aset          material adjustment to the carrying amounts of
     dan liabilitas dalam tahun pelaporan berikutnya             assets and liabilities within the next financial year,
     dijelaskan di bawah ini:                                    are discussed below:

     Provisi atas kerugian kredit ekspektasian                   Provision for expected credit losses of trade
     piutang usaha dan aset keuangan lainnya                     receivables and other financial assets

     Grup menggunakan matriks provisi untuk                      The Group uses a provision matrix to calculate
     menghitung kerugian kredit ekspektasian piutang             expected credit losses for trade receivables. The
     usaha. Tingkat provisi adalah berdasarkan hari jatuh        provision rates are based on days past due for
     tempo atas kelompok segmen pelanggan yang                   groupings of various customer segments that have
     mempunyai karakteristik risiko kredit yang serupa           similar credit risk characteristics (e.g., by product
     (misalnya berdasarkan tipe produk dan tipe                  type and customer type and/or customer rating).
     dan/atau peringkat pelanggan).

     Matriks provisi pada mulanya didasarkan pada                The provision matrix is initially based on the Group’s
     tingkat gagal bayar historis Grup yang diobservasi.         historical observed default rates. The Group will
     Grup akan memperbaharui matriks untuk                       calibrate the matrix to adjust the historical credit loss
     menyesuaikan pengalaman kerugian kredit historis            experience with forward-looking information. For
     dengan informasi forward-looking. Sebagai contoh,           instance, if forecast economic conditions are
     jika perkiraan atas kondisi ekonomi diperkirakan            expected to deteriorate over the next year, which
     memburuk selama tahun depan, yang dapat                     can lead to an increased number of defaults, the
     menyebabkan meningkatnya jumlah gagal bayar,                historical default rates are adjusted. At every
     tingkat gagal bayar historis disesuaikan. Pada              reporting date, the historical observed default rates
     setiap tanggal pelaporan, tingkat gagal bayar               are updated and changes in the forward-looking
     historis diperbaharui dan perubahan estimasi                estimates are analysed.
     forward-looking dianalisis.

     Penilaian atas korelasi antara tingkat gagal bayar          The assessment of the correlation between
     historis yang diobservasi, perkiraan atas kondisi           historical observed default rates, forecast economic
     ekonomi, dan kerugian kredit ekspektasian                   conditions, and expected credit losses is a
     merupakan estimasi yang signifikan. Jumlah                  significant estimate. The amount of expected credit
     kerugian kredit ekspektasian paling dipengaruhi             losses is sensitive to changes in circumstances and
     oleh perubahan keadaan dan perkiraan kondisi                forecast economic conditions. The Group’s historical
     ekonomi. Pengalaman kerugian kredit historis Grup           credit loss experience and forecast of economic
     dan perkiraan kondisi ekonomi juga mungkin tidak            conditions may also not be representative of a
     menggambarkan gagal bayar aktual pelanggan di               customer’s actual default in the future.
     masa yang akan datang.
Page 61
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/51 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                             FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                        JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)    (Expressed in millions of Rupiah, unless otherwise stated)

4.   PERTIMBANGAN AKUNTANSI PENTING DAN                     4.   CRITICAL ACCOUNTING JUDGEMENTS AND
     ESTIMASI AKUNTANSI SIGNIFIKAN (lanjutan)                    SIGNIFICANT  ACCOUNTING   ESTIMATES
                                                                 (continued)

     Sumber ketidakpastian estimasi (lanjutan)                   Sources of estimation uncertainty (continued)

     Pengakuan pendapatan                                        Revenue recognition

     Penjualan tenaga listrik prabayar                           Prepaid sales of electricity

     Penjualan tenaga listrik prabayar mencakup                  Prepaid sales of electricity includes an estimate of
     estimasi atas listrik yang dikonsumsi oleh pelanggan        electricity consumed by customers between the date
     antara tanggal pembelian token terakhir dan akhir           of the last token purchased and the financial year
     tahun keuangan Grup. Estimasi dilakukan dengan              end of the Group. An estimate is made by prorating
     memproratakan jumlah hari antara tanggal terakhir           the total days between the date of the last token
     pembelian token yang dibeli dengan tanggal laporan          purchased and the date of the Group’s financial
     keuangan Grup dengan konsumsi historis                      statement using the historical consumption of the
     pelanggan.                                                  customers.

     Biaya penyambungan pelanggan                                Customer connection fees

     Jasa koneksi yang diserahkan kepada pelanggan               A connection service which is provided to the
     tidak merepresentasikan nilai yang berdiri sendiri          customer does not represent a stand-alone value for
     (stand-alone value) untuk pelanggan tersebut.               that customer. Consequently, the Group recognises
     Sebagai      hasilnya,  Grup     mencatat      biaya        connection fees received from customers to connect
     penyambungan yang diterima dari pelanggan untuk             the customers to its network as revenue over time
     menghubungkan pelanggan ke jaringan listrik Grup            and amortises it starting from the connection date
     sebagai pendapatan yang diakui sepanjang waktu              based on the estimated consumption pattern of the
     dan diamortisasi sejak tanggal penyambungan                 customer. The customers’ consumption is estimated
     sesuai masa estimasi konsumsi pelanggan.                    based on the average useful life of the distribution
     Konsumsi pelanggan diestimasi berdasarkan rata-             assets. Given the wide variety of distribution assets
     rata masa manfaat aset distribusi. Dengan                   and remaining useful lives, the Group has applied an
     mempertimbangkan banyaknya variasi aset                     average life of 20 years, which the Group believes
     distribusi dan masa manfaat atas aset-aset tersebut,        to be representative of the useful lives of the assets.
     Grup telah menerapkan rata-rata masa manfaat 20             A change in the estimated useful lives of distribution
     tahun yang dipercaya telah merepresentasikan                assets would result in a change in the revenue
     keseluruhan masa manfaat. Perubahan estimasi                recognised from connection fees.
     atas masa manfaat aset distribusi akan
     mengakibatkan perubahan pada pengakuan
     pendapatan dari biaya penyambungan.
Page 62
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/52 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                             FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                        JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)    (Expressed in millions of Rupiah, unless otherwise stated)

4.   PERTIMBANGAN AKUNTANSI PENTING DAN                     4.   CRITICAL ACCOUNTING JUDGEMENTS AND
     ESTIMASI AKUNTANSI SIGNIFIKAN (lanjutan)                    SIGNIFICANT  ACCOUNTING   ESTIMATES
                                                                 (continued)

     Sumber ketidakpastian estimasi (lanjutan)                   Sources of estimation uncertainty (continued)

     Taksiran masa manfaat ekonomis aset tetap                   Estimated useful lives of property, plant and
                                                                 equipment

     Masa manfaat setiap aset tetap yang dimiliki Grup           The useful life of each item of the Group’s property,
     ditentukan berdasarkan periode aset tersebut                plant and equipment is estimated based on the
     diharapkan masih dapat digunakan. Estimasi ini              period over which the asset is expected to be
     ditentukan berdasarkan evaluasi teknis internal dan         available for use. Such estimation is based on
     pengalaman atas aset sejenis. Masa manfaat setiap           internal technical evaluation and experience with
     aset direviu secara periodik dan disesuaikan apabila        similar assets. The estimated useful life of each
     prakiraan berbeda dengan estimasi sebelumnya                asset is reviewed periodically and updated if
     karena keausan, keusangan teknis atau komersial,            expectations differ from previous estimates due to
     dan hukum atau keterbatasan lainnya atas                    physical wear and tear, technical or commercial
     pemakaian aset. Namun terdapat kemungkinan                  obsolescence, and legal or other limits on the use of
     bahwa hasil operasi dimasa mendatang dapat                  the asset. It is possible, however, that future results
     dipengaruhi secara signifikan oleh perubahan atas           of operations could be materially affected by
     jumlah serta tahun pencatatan beban yang                    changes in the amounts and timing of recorded
     diakibatkan karena perubahan faktor yang                    expenses brought about by changes in the factors
     disebutkan di atas.                                         mentioned above.

     Perubahan masa manfaat aset tetap dapat                     A change in the estimated useful life of any item of
     mempengaruhi jumlah biaya penyusutan yang                   property, plant and equipment would affect the
     diakui dan nilai tercatat aset tetap.                       recorded depreciation expense and the carrying
                                                                 values of property, plant and equipment.

     Nilai wajar aset tetap dan properti investasi yang          Fair value of property, plant and equipment and
     menggunakan model revaluasi                                 investment properties that use the revaluation
                                                                 model

     Dalam proses revaluasi aset, manajemen, dengan              In the process of asset revaluation, management,
     bantuan penilai publik independen, menentukan               with the assistance of an independent public valuer,
     data dan asumsi, menelaah metode penilaian serta            determines the data inputs and assumptions,
     berdiskusi dengan penilai. Pendekatan dan metode            assesses valuation methods, and holds discussions
     yang digunakan dalam melakukan revaluasi                    with the valuers as part of the valuation process. The
     tergantung pada kelas aset. Walaupun data dan               approaches and methods used in the revaluation
     asumsi Grup dianggap tepat dan wajar, namun                 depend on the asset class. While it is believed that
     perubahan signifikan pada data input atau asumsi            the Group’s data and assumptions are reasonable
     yang digunakan dapat berpengaruh secara                     and appropriate, significant changes in data inputs
     signifikan terhadap nilai aset yang menggunakan             or significant changes in assumptions may
     model revaluasi.                                            materially affect the value of assets that use the
                                                                 revaluation model.

     Rincian dari pendekatan dan data input signifikan           Details of the valuation approach and significant
     yang digunakan dalam melakukan revaluasi aset               data inputs used in the revaluation of property, plant
     tetap dan properti investasi diungkapkan dalam              and equipment and investment properties are
     Catatan 6 dan 8.                                            disclosed in Notes 6 and 8, respectively.
Page 63
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/53 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                       NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                              FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                         JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)     (Expressed in millions of Rupiah, unless otherwise stated)

4.   PERTIMBANGAN AKUNTANSI PENTING DAN                      4.   CRITICAL ACCOUNTING JUDGEMENTS AND
     ESTIMASI AKUNTANSI SIGNIFIKAN (lanjutan)                     SIGNIFICANT  ACCOUNTING   ESTIMATES
                                                                  (continued)

     Sumber ketidakpastian estimasi (lanjutan)                    Sources of estimation uncertainty (continued)

     Imbalan pascakerja                                           Post-employment benefits

     Penentuan liabilitas imbalan pascakerja tergantung           The determination of post-employment benefits is
     pada pemilihan asumsi tertentu yang digunakan                dependent on the selection of certain assumptions
     oleh aktuaris dalam menghitung jumlah liabilitas             used by actuaries when calculating such amounts.
     tersebut. Asumsi tersebut termasuk antara lain               Those assumptions include, among others, the
     tingkat diskonto dan tingkat kenaikan gaji. Realisasi        discount rate and rate of salary increase. Actual
     yang berbeda dari asumsi Grup diakumulasi dan                results that differ from assumptions are accumulated
     diamortisasi selama periode mendatang dan                    and amortised over future periods and therefore,
     akibatnya akan berpengaruh terhadap jumlah biaya             generally affect the recognised expenses and
     serta liabilitas yang diakui di masa mendatang.              liabilities recorded in such future periods. While it is
     Walaupun asumsi Grup dianggap tepat dan wajar,               believed that the assumptions are reasonable and
     namun perubahan signifikan pada kenyataannya                 appropriate, significant differences in actual
     atau perubahan signifikan dalam asumsi yang                  experience or significant changes in assumptions
     digunakan dapat berpengaruh secara signifikan                may materially affect the post-employment benefits
     terhadap liabilitas imbalan pascakerja Grup.                 liability of the Group.

     Asumsi yang digunakan untuk perhitungan liabilitas           Assumptions used in the calculation of post-
     imbalan pascakerja diungkapkan dalam Catatan 49.             employment benefits are disclosed in Note 49.

     Pajak penghasilan                                            Income taxes

     Perhitungan beban pajak penghasilan Grup                     The calculations of income tax expenses for the
     memerlukan pertimbangan dan asumsi dalam                     Group require judgements and assumptions in
     menentukan pengurangan beban tertentu selama                 determining the deductibility of certain expenses
     proses pengestimasian. Semua pertimbangan dan                during the estimation process. All judgements and
     estimasi   yang     dibuat    manajemen       dapat          estimates made by management may be challenged
     dipertanyakan oleh Direktorat Jenderal Pajak.                by the Directorate General of Taxation. As a result,
     Sebagai akibatnya, terjadi ketidakpastian dalam              the ultimate tax determination becomes uncertain.
     penentuan pajak. Resolusi posisi pajak yang diambil          The resolution of tax positions taken by the Group,
     oleh Grup, melalui negosiasi dengan otoritas pajak           through negotiations with the relevant tax authorities
     yang relevan dapat berlangsung bertahun-tahun                can take several years to complete and in some
     dan sangat sulit untuk memprediksi hasil akhirnya.           cases it is difficult to predict the ultimate outcome.
     Apabila terdapat perbedaan perhitungan pajak                 Where the final outcome of these matters is different
     dengan jumlah yang telah dicatat, perbedaan                  from the amounts initially recorded, such differences
     tersebut akan berdampak pada pajak penghasilan               will have an impact on the income tax and deferred
     dan pajak tangguhan dalam tahun dimana                       income tax provision in the year in which this
     penentuan pajak tersebut dibuat.                             determination is made.

     Aset pajak tangguhan, termasuk yang timbul dari              Deferred tax assets, including those arising from tax
     rugi fiskal dan perbedaan temporer, diakui apabila           losses carried forward and temporary differences,
     dianggap lebih mungkin daripada tidak bahwa                  are recognised only where it is considered more
     mereka dapat diterima kembali, dimana hal ini                likely than not that they will be recovered, which is
     tergantung pada kecukupan pembentukan laba                   dependent on the generation of sufficient future
     kena pajak di masa depan. Asumsi atas                        taxable profits. The assumptions about the
     pembentukan laba kena pajak sangat dipengaruhi               generation of future taxable profits are heavily
     oleh estimasi dan asumsi manajemen atas tingkat              affected by management’s estimation and
     penjualan dan biaya-biaya terkait yang terdapat              assumption regarding the level of sales and the
     risiko ketidakpastian, sehingga ada kemungkinan              associated costs which are subject to risk and
     perubahan estimasi dan asumsi tersebut akan                  uncertainty and hence there is a possibility that
     mengubah proyeksi laba kena pajak di masa                    changes in circumstances will alter the projected
     mendatang.                                                   future taxable profits.
Page 64
                            PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                         DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                       Lampiran 5/54 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                    NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                           FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                                      JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                  (Expressed in millions of Rupiah, unless otherwise stated)

4.      PERTIMBANGAN AKUNTANSI PENTING DAN                                               4.     CRITICAL ACCOUNTING JUDGEMENTS AND
        ESTIMASI AKUNTANSI SIGNIFIKAN (lanjutan)                                                SIGNIFICANT  ACCOUNTING   ESTIMATES
                                                                                                (continued)

        Sumber ketidakpastian estimasi (lanjutan)                                               Sources of estimation uncertainty (continued)

        Sewa - estimasi                           suku     bunga        pinjaman                Leases - estimation           of   the       incremental
        inkremental                                                                             borrowing rate

        Karena Grup tidak dapat dengan mudah                                                    Since the Group cannot readily determine the
        menentukan suku bunga implisit, manajemen                                               implicit rate, management uses the Group’s
        menggunakan suku bunga pinjaman inkremental                                             incremental borrowing rate as a discount rate. There
        Grup sebagai tingkat diskonto. Ada beberapa faktor                                      are a number of factors to consider in determining
        yang perlu dipertimbangkan dalam menentukan                                             an incremental borrowing rate, many of which need
        suku bunga pinjaman inkremental, yang banyak di                                         estimation in order to be able to reliably quantify any
        antaranya memerlukan estimasi untuk dapat secara                                        necessary adjustments to arrive at the final discount
        andal mengukur penyesuaian yang diperlukan untuk                                        rates.
        sampai pada tingkat diskonto akhir.

        Dalam menentukan suku bunga pinjaman                                                    In determining the incremental borrowing rate,
        inkremental, Grup mempertimbangkan faktor-faktor                                        the Group considers the following main factors:
        utama berikut: risiko kredit korporat Grup, jangka                                      the Group’s corporate credit risk, the lease term,
        waktu sewa, jangka waktu pembayaran sewa,                                               the lease payment term, the economic environment,
        lingkungan ekonomi, waktu di mana sewa                                                  the time at which the lease is entered into, and the
        dimasukkan, dan mata uang di mana pembayaran                                            currency in which the lease payments are
        sewa ditentukan.                                                                        denominated.


5.      ENTITAS ANAK                                                                     5.     SUBSIDIARIES
        Perusahaan memiliki saham entitas anak baik                                             The Company has ownership interests, directly or
        langsung maupun tidak langsung sebagai berikut:                                         indirectly, in the following subsidiaries:
     Note 5 - Direct and indirect ownerships in
                                                                              Persentase kepemilikan/              Tahun
     Subsidiaries
                                                                                                                                        Jumlah aset sebelum
     As of 30 Juni 2025                                                               Percentage of               operasi
                                                                                                                                             eliminasi**)/
                                                                                                                                         Total Assets Before
                                                                                      Ownership %                komersial/
                                                                                                                                            Elimination**)
                                                                           30 Juni/            31 Desember/        Year of         30 Juni/            31 Desember/
            Entitas anak/               Domisili/     Jenis usaha/         June, 30            December, 31      commercial        June, 30            December, 31
                                                       Nature of
            Subsidiaries                Domicile                            2025                      2024       operation           2025                 2024
                                                       Business

     PT PLN Indonesia Power              Jakarta     Power                 99.99%                99.99%            1995            439,957              426,760
     ("PIP") and its subsidiaries                    generation

       PT PLN Indonesia Power            Jakarta     Cogeneration,         99.99%                99.99%            1999             1,525                1,437
        Services       ("PIPS";                      energy
        previously named                             distribution,
                                                     energy service
                                                     and
      PT    Cogindo         Daya                     management
       Bersama) *)

      PT Artha Daya Coalindo             Jakarta     Coal trading          80.00%                80.00%            1998              968                  675
       ("ADC") *)

      PT Indo Ridlatama Power             Kutai      Power                 90.00%                90.00%            2018             1,483                1,394
       ("IRP") *)                                    generation

      PT     PLN      Indonesia          Jakarta     Electricity and       99.99%                99.99%            2016             10,521               9,997
       Renewables ("IPRen")                          energy
       and its subsidiaries *)

         PT PLN Indonesia                Jakarta      Development          96.04%                96.04%            2019              236                  242
        Geothermal ("IGeo") *)                        of new and
                                                      renewable
                                                       energy

        *) Pemilikan tidak langsung/Indirect ownership
        **) Dalam miliaran Rupiah/Stated in billions of Rupiah
        ***) Dalam tahap pengembangan/Under development stage
Page 65
                             PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                          DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                            Lampiran 5/55 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                        NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                               FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                                          JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                      (Expressed in millions of Rupiah, unless otherwise stated)

5.      ENTITAS ANAK (lanjutan)                                                              5.     SUBSIDIARIES (continued)
        Perusahaan memiliki saham entitas anak baik                                                 The Company has ownership interests, directly or
        langsung maupun tidak langsung sebagai berikut:                                             indirectly, in the following subsidiaries: (continued)
        (lanjutan)

       Note 5 - Direct and indirect ownerships in Sub-
                                                                                      Persentase kepemilikan/          Tahun
       sidiaries
                                                                                                                                          Jumlah aset sebelum
       As of 30 Juni 2025                                                                      Percentage of           operasi
                                                                                                                                               eliminasi**)/
                                                                                                                       komer-              Total Assets Before
                                                                                               Ownership %
                                                                                                                        sial/                 Elimination**)
                                                                                                        31 Desem-                                        31 Desem-
                                                                                    30 Juni/                           Year of       30 Juni/
                                                                                                           ber/                                              ber/
                                                                                     June,              December,     commer-                            December,
               Entitas anak/                Domisili/      Jenis usaha/                                                              June, 30
                                                                                      30                    31          cial                                  31
                                                          Nature of Busi-
               Subsidiaries                 Domicile                                 2025                  2024       operation       2025                2024
                                                               ness

       PT Suralaya Indo Tenaga               Jakarta      Electricity and           99.99%               99.99%         ***)          8,184              7,658
        ("SIT")                                           energy
            and its subsidiaries *)

       PT Putra Suralaya         Indo       Jakarta       Electricity and           99.99%               99.99%         ***)          8,184              7,658
        Tenaga ("PSI") *)                                 energy


     PT PLN Nusantara Power                 Surabaya      Power                     99.99%               99.99%        1995          368,443            355,348
        ("PNP") and its subsidiaries                      generation

       PT PLN Nusantara Power              Surabaya              Service            99.00%               99.00%        2001           1,852              1,953
        Services ("NPS"; previously
        named
        PT PJB Services) and its
        subsidiary *)

        PT Mitra Karya          Prima      Surabaya              Service            92.00%               92.00%        2005            218                237
         ("MKP") *)

      PT PLN Nusantara Power                 Jakarta       Engineering,             99.00%               99.00%        2004           2,049              2,161
       Construction ("PLN NPC")                            procurement
       and its subsidiary *)                                    and
                                                            construction
                                                          and electricity

        PT Prima Power Nusantara             Jakarta       Engineering,            100.00%               100.00%       2017            158                155
         ("PPN")                                           procurement
                                                                and
                                                            construction
                                                          and electricity

      PT    Navigat       Innovative      Palembang          Trading,               72.97%               72.97%        2002            457                508
       Indonesia ("NII") *)                                construction,
                                                            mining and
                                                            agriculture

      PT PLN Nusantara                       Jakarta      Investment                99.99%               99.99%        2015           9,622              10,260
       Renewables ("PLN NR")
          and its subsidiaries *)

        PT Pembangkitan Jawa Bali            Jakarta        Investment              99.99%               99.99%        2020            283                406
         Investindo
         ("PJB Investindo") *)

           PT Pembangkitan Jawa              Jakarta      Special                   99.99%               99.99%        2020            381                406
            Baskara Investasi Cirata                      Purpose
            ("PJBIC")                                     Company for
                                                          Cirata's project

      PT Prima Layanan Niaga Suku            Jakarta      Operation and             100%                  100%         2018           1,104               748
       Cadang ("PLN SC") *)                               services trading,
                                                          engineering
                                                          supply chain
                                                          and
                                                          consultation in
                                                          the electricity
                                                          sector

        *) Pemilikan tidak langsung/Indirect ownership
        **) Dalam miliaran Rupiah/Stated in billions of Rupiah
        ***) Dalam tahap pengembangan/Under development stage
Page 66
                              PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                           DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                          Lampiran 5/56 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                       NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                              FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                                         JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                     (Expressed in millions of Rupiah, unless otherwise stated)

5.      ENTITAS ANAK (lanjutan)                                                             5.     SUBSIDIARIES (continued)
        Perusahaan memiliki saham entitas anak baik                                                The Company has ownership interests, directly or
        langsung maupun tidak langsung sebagai berikut:                                            indirectly, in the following subsidiaries: (continued)
        (lanjutan)
 Note 5 - Direct and indirect ownerships in
                                                                                  Persentase kepemilikan/             Tahun
 Subsidiaries
                                                                                                                                            Jumlah aset sebelum
 As of 30 Juni 2025                                                                       Percentage of               operasi
                                                                                                                                                 eliminasi**)/
                                                                                                                                             Total Assets Before
                                                                                          Ownership %                komersial/
                                                                                                                                                Elimination**)
                                                                               30 Juni/            31 Desember/       Year of          30 Juni/            31 Desember/
         Entitas anak/             Domisili/         Jenis usaha/              June, 30            December, 31     commercial         June, 30            December, 31
                                                    Nature of Busi-
          Subsidiaries             Domicile                                     2025                      2024       operation          2025                  2024
                                                         ness

                                                   Penasihat dan
      PT PLN Nusantara                             perunding dalam
       Renewable Investasi                         merger dan
       ("NRI") *)                   Jakarta        akuisisi/                   99.88%                99.88%                              103                  103
                                                   Advisors or
                                                   mediators in
                                                   merger and
                                                   acquisitions

 PT Pelayanan Listrik
  Nasional Batam (‘PLN
  Batam” and its
  subsidiary                        Batam         Electricity supplier         99.99%                99.99%            2000            23,838                23,673


     PT Pelayanan Energi            Batam         Construction of gas
      Batam ("PEB")                               pipeline and                 99.99%                99.99%            2016             1,116                1,077
                                                  other energy sector

 PT Indonesia Comnet
  Plus ("PLN ICON+") and                          Telecommunication
  its subsidiary                 Jakarta          provider                     99.99%                99.99%            2000            11,837                11,824


     PT Indonesia
     Connectivity Investasi                       Supervision      and
     ("ICONVEST");                  Jakarta       consultation                 99.99%                99.99%            2010              112                  112

      PT Terang Wahana
        Hijau ("Icon Green")
        *)                          Jakarta       Renewable energy             99.50%                99.50%            2024              11                    11


 PT Prima Layanan
  Nasional Enjiniring                             Engineering,
  (“PLNE”)                          Jakarta       procurement and              99.90%                99.90%            2003             1,852                1,920
                                                  construction
                                                  ("EPC")


 PT Pelayanan Listrik                             Maintenance      and
   Nasional Nusa Daya              Tarakan        operation                    99.97%                99.97%            2004             2,017                1,388
 ("PLN ND") and its
   subsidiary

     PT Paguntaka Cahaya                          Maintenance      and
      Nusantara ("PCN") *)        Balikpapan      operation                    99.96%                99.96%            2018               2                    2

 Majapahit Holding B.V.
  ("MH")                         Amsterdam,       Financial institution       100.00%                100.00%           2006             6,281                6,048
 and its subsidiary              Netherland

     Majapahit Finance B.V.
      ("MF") *)                  Amsterdam,       Financial institution       100.00%                100.00%           2006             6,281                6,048
                                 Netherland

 PT PLN Energi Primer
   Indonesia Batubara               Jakarta       Coal trading                 99.99%                99.99%            2009            27,050                25,663
 ("PLN EPI") and its
   subsidiaries

      PT Jambi Prima Coal
      ("JPC")                       Jambi         Coal mining                  60.00%                60.00%            2010              262                  251

        *) Pemilikan tidak langsung/Indirect ownership
        **) Dalam miliaran Rupiah/Stated in billions of Rupiah
        ***) Dalam tahap pengembangan/Under development stage
Page 67
                             PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                          DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                         Lampiran 5/57 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                     NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                            FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                                       JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                   (Expressed in millions of Rupiah, unless otherwise stated)

5.       ENTITAS ANAK (lanjutan)                                                          5.    SUBSIDIARIES (continued)

        Perusahaan memiliki saham entitas anak baik                                             The Company has ownership interests, directly or
        langsung maupun tidak langsung sebagai berikut:                                         indirectly, in the following subsidiaries: (continued)
        (lanjutan)
Note 5 - Direct and indirect ownerships in Sub-
                                                                                  Persentase kepemilikan/            Tahun
sidiaries
                                                                                                                                          Jumlah aset sebelum
As of 30 Juni 2025                                                                        Percentage of             operasi
                                                                                                                                               eliminasi**)/
                                                                                                                                           Total Assets Before
                                                                                          Ownership %              komersial/
                                                                                                                                              Elimination**)
                                                                               30 Juni/            31 Desember/      Year of         30 Juni/            31 Desember/
          Entitas anak/              Domisili/         Jenis usaha/            June, 30            December, 31    commercial        June, 30            December, 31
          Subsidiaries               Domicile       Nature of Business          2025                   2024         operation         2025                   2024


     PT PLN Energi Primer
      Indonesia         Investasi
      ("EPII")        previously
      named         PT      PLN
      Batubara Investasi) and
      its subsidiaries *)             Jakarta       Investasi/Investment       99.96%                99.96%          2018             2,657                2,750

      PT Bangun Persada
       Jambi Energi ("BPJE")
       *)                             Jambi             Coal mining            80.00%                80.00%           ***)             37                    37

      PT Mahakarya Abadi
       Prima ("MAP") *)               Jambi             Coal mining            80.00%                80.00%           ***)              3                    3

      PT Bayan Koalindo
       Lestari ("BKL") *)           Palembang           Coal mining            51.00%                51.00%          2018              728                  792

      PT Prima Bara                 Central
       Indonesia ("PBI") *)         Kalimantan          Coal mining            51.00%                51.00%           ***)             188                  187

 PT PLN Batubara Niaga
  ("BBN")                             Jakarta           Coal trading           100.00%               100.00%         2020             3,971                3,461

 PT PLN Energi Gas ("EG")             Jakarta        Power generation          99.99%                99.99%          2010             2,443                2,469

 PT Pelayaran Bahtera
  Adhiguna ("BAG")                    Jakarta            Shipping              99.99%                99.99%          2011             6,764                6,069

                                                     Maintenance and
PT Haleyora Power ("HP")              Jakarta           operation              99.99%                99.99%          2013             2,524                1,877
 and its subsidiary

                                                       Technical and
 PT Haleyora Powerindo                                 maintenance
  ("HPI") *)                          Jakarta            services              95.00%                95.00%          2013              722                  646

                                                       Energy and
PT Energy Management                                  Environmental
 Indonesia ("EMI") and its                            Conservation
 subsidiary                           Jakarta           Services               99.99%                99.99%          1987              49                    49
                                                        and New
                                                    Renewable Energy

 PT Energi Biomasa                    Jakarta           Energy and             99.00%                99.00%          2015               4                    4
  Indonesia (“EBI”)*)                                  environmental
                                                    conservation service
                                                    and new renewable
                                                          energy

 PT Energi Biomasa                                                             80.00%                80.00%           ***)              1                    1
  Indonesia (“EBI 2”)*)


PT Mandau Cipta Tenaga
 Kerja ("MCTN") and its
 subsidiary                           Jakarta         Energy services          95.00%                95.00%          2000             1,857                1,660




        *) Pemilikan tidak langsung/Indirect ownership
        **) Dalam miliaran Rupiah/Stated in billions of Rupiah
        ***) Dalam tahap pengembangan/Under development stage
Page 68
                        PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                     DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                               Lampiran 5/58 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                              NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                     FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                                JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                            (Expressed in millions of Rupiah, unless otherwise stated)

6.   ASET TETAP                                                                    6.     PROPERTY, PLANT AND EQUIPMENT

                                                                         30 Juni/June 30, 2025

                                             Saldo awal/       Penambahan/       Pengurangan/      Reklasifikasi/     Saldo akhir/
                                          Beginning balance     Additions         Deductions     Reclassifications   Ending balane

     Biaya perolehan                                                                                                                                                 At cost
     Pemilikan langsung                                                                                                                                  Direct acquisitions
      Tanah                                      181,766,716           3,347                -           1,241,373       183,011,436                                  Land
      Bangunan umum, waduk                                                                                                                     Buildings, reservoir and
        dan prasarana                             90,705,028          47,605                -           2,024,808        92,777,441                        infrastructure
      Instalasi dan mesin                                                                                                                         Installation and power
        pembangkit                               584,282,646         420,542                -           3,635,058       588,338,246                                 plant
      Perlengkapan transmisi                     278,330,626           7,200                -           5,530,154       283,867,980           Transmission equipment
      Perlengkapan distribusi                    264,960,966          24,887                -           7,920,634       272,906,487              Distribution equipment
      Perlengkapan umum                           24,109,734          80,167                -             278,128        24,468,029                  General equipment
      Kendaraan bermotor                             192,766         117,340                -             726,374         1,036,480                       Motor vehicles
      Material cadang                              5,580,835          61,906                -           1,420,689         7,063,430                            Spare parts
      Perlengkapan pengolahan                                                                                                             Telecommunication and data
        data dan telekomunikasi                    7,452,747           8,041                -            847,496          8,308,284             processing equipment
      Perlengkapan pengolahan                                                                                                            Others telecommunication and
        data dan telekomunikasi lainnya           10,600,118           2,963                -                   1        10,603,082        data processing equipment
      Kapal dan perlengkapan                       3,335,309               -                -           (653,803)         2,681,506             Vessels and equipment

      Sub-jumlah                               1,451,317,491         773,998                -         22,970,912      1,475,062,401                              Subtotal


     Aset dalam pembangunan                       82,592,935      24,578,454                -        (19,832,163)        87,339,226              Construction in progress
     Aset tidak digunakan dalam operasi           13,977,208               -         (36,937)            387,891         14,328,162           Assets not used in operation

     Jumlah                                    1,547,887,634      25,352,452         (36,937)          3,526,640      1,576,729,789                                   Total


     Akumulasi penyusutan                                                                                                                   Acummulated depreciation
      dan penurunan nilai                                                                                                                              and impairment
     Pemilikan langsung                                                                                                                                  Direct acquisitions
      Bangunan umum, waduk                                                                                                                     Buildings, reservoir and
        dan prasarana                                      -       1,554,238                -            182,016          1,736,254                        infrastructure
      Instalasi dan mesin                                                                                                         -               Installation and power
        pembangkit                                         -      10,576,740                -          2,000,356         12,577,096                                 plant
      Perlengkapan transmisi                               -       4,781,901                -           (51,523)          4,730,378           Transmission equipment
      Perlengkapan distribusi                              -       6,014,588                -           (29,498)          5,985,090              Distribution equipment
      Perlengkapan umum                           20,270,291         712,679                -           (49,174)         20,933,796                  General equipment
      Kendaraan bermotor                           1,486,192         132,032                -          1,487,055          3,105,279                       Motor vehicles
      Material cadang                                      -          53,316                -          1,346,608          1,399,924                    Major spare parts
      Perlengkapan pengolahan                                                                                                     -        Telecommunication and data
        data dan telekomunikasi                            -         704,505                -          5,624,778          6,329,283             processing equipment
      Perlengkapan pengolahan                                                                                                     -      Others telecommunication and
        data dan telekomunikasi lainnya            5,010,610         620,728                -         (5,613,161)            18,177       data processimg equipment
      Kapal dan perlengkapan                       1,345,940               -                -         (1,345,940)                 -            Vessels and equipment

      Sub-jumlah                                  28,113,033      25,150,727                -          3,551,517         56,815,277                             Subtotal


     Aset tidak digunakan dalam operasi            7,595,294         759,897         (34,421)            (50,930)         8,269,840          Assets not used in operation

     Jumlah                                       35,708,327      25,910,624         (34,421)          3,500,587        65,085,117                                    Total

     Penyisihan penurunan nilai                     278,067                  -              -           (278,067)                    -         Provision for impairment

     Jumlah Tercatat                           1,511,901,240                                                          1,511,644,672                   Net carriying value
Page 69
                        PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                     DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                  Lampiran 5/59 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                       FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                                  JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                              (Expressed in millions of Rupiah, unless otherwise stated)

6.   ASET TETAP (lanjutan)                                                            6.      PROPERTY,                   PLANT           AND         EQUIPMENT
                                                                                              (continued)
                                                                        31 Desember/December 31, 2024
                                                                                                  Surplus (defisit)
                                      Saldo awal/                                                    revaluasi/            Saldo akhir/
                                      Beginning       Penambahan/ Pengurangan/   Reklasifikasi/     Revaluation              Ending
                                       balance          Additions   Disposals   Reclassifications surplus (deficit)         balance

     BIaya perolehan atau revaluasi                                                                                                                   At cost or revaluation
     Pemilikan langsung                                                                                                                                     Direct acquisitions
     Hak atas tanah                    168,127,620         146,488              -           3,614,986       9,877,622        181,766,716                             Land rights
     Bangunan umum, waduk                                                                                                                           Buildings, reservoirs and
       dan prasarana                    83,884,900         389,312        (12,684)          7,225,213        (781,713)         90,705,028                       infrastructure
     Instalasi dan mesin                                                                                                                              Installations and power
       pembangkit                      590,572,905       2,070,458       (821,756)      (11,743,507)         4,204,546       584,282,646                                 plants
     Perlengkapan transmisi            265,057,265          42,780              -        23,597,198        (10,366,617)      278,330,626           Transmission equipment
     Perlengkapan distribusi           267,255,807          89,092              -        21,262,175        (23,646,108)      264,960,966               Distribution equipment
     Material cadangan utama             3,316,055         325,898              -         3,365,377         (1,426,495)        5,580,835                     Major spare parts
     Perlengkapan                                                                                                                                       Telecommunications
       pengolahan data dan                                                                                                                                           and data
       telekomunikasi yang                                                                                                                           processing equipment
       digunakan dalam                                                                                                                                                used for
       penyediaan listrik                8,655,541          52,148          (3,948)         1,483,009       (2,734,003)         7,452,747                   electricity supply
     Perlengkapan umum                  21,674,868         475,975               -          1,958,891                -         24,109,734                 General equipment
     Kendaraan bermotor                  3,156,177         119,468               -         (3,082,879)               -            192,766                        Motor vehicles
     Perlengkapan pengolahan data                                                                                                             Other telecommunications and
       dan telekomunikasi lainnya        9,328,873           7,145              -           1,264,100                 -        10,600,118      data processing equipment
     Kapal dan perlengkapan              2,681,505         653,804              -                   -                 -         3,335,309            Vessels and equipment

     Subjumlah                        1,423,711,516       4,372,568      (838,388)         48,944,563      (24,872,768)     1,451,317,491                             Subtotal

     Aset dalam pembangunan            128,753,555      59,521,608              -      (105,682,228)                  -        82,592,935            Construction in progress

     Aset tidak digunakan                                                                                                                                     Assets not used
      dalam operasi                     16,077,130                -    (2,713,568)          1,700,353       (1,086,707)        13,977,208                      in operations

     Jumlah                           1,568,542,201     63,894,176     (3,551,956)      (55,037,312)       (25,959,475)     1,547,887,634                                 Total

     Akumulasi penyusutan                                                                                                                       Accumulated depreciation
       dan penurunan nilai                                                                                                                                and impairment
     Pemilikan langsung                                                                                                                                     Direct acquisitions
     Bangunan umum, waduk                                                                                                                           Buildings, reservoirs and
       dan prasarana                     5,434,440       1,970,381        (12,684)         (4,662,661)      (2,729,476)                   -                     infrastructure
     Instalasi dan mesin                                                                                                                              Installations and power
       pembangkit                       39,593,908      13,090,541       (821,756)      (39,016,800)       (12,845,893)                   -                              plants
     Perlengkapan transmisi             13,649,962       7,619,123              -            (25,454)      (21,243,631)                   -        Transmission equipment
     Perlengkapan distribusi            19,558,835      11,066,997              -          (129,809)       (30,496,023)                   -            Distribution equipment
     Material cadangan utama               188,461         109,415              -         1,242,709         (1,540,585)                   -                  Major spare parts
     Perlengkapan                                                                                                                                       Telecommunications
       pengolahan data dan                                                                                                                                           and data
       telekomunikasi yang                                                                                                                           processing equipment
       digunakan dalam                                                                                                                                                used for
       penyediaan listrik                2,301,142       1,148,212         (3,948)            (62,515)      (3,382,891)                 -                   electricity supply
     Perlengkapan umum                  18,548,886      10,285,405              -          (8,564,000)               -         20,270,291                 General equipment
     Kendaraan bermotor                  2,575,549           3,347              -          (1,092,704)               -          1,486,192                        Motor vehicles
     Perlengkapan pengolahan data                                                                                                             Other telecommunications and
       dan telekomunikasi lainnya        3,793,630       1,181,742              -             35,238                  -         5,010,610      data processing equipment
     Kapal dan perlengkapan              1,117,064         228,876              -                  -                  -         1,345,940            Vessels and equipment

     Subjumlah                         106,761,877      46,704,039       (838,388)      (52,275,996)       (72,238,499)        28,113,033                             Subtotal

     Aset tidak digunakan                                                                                                                                     Assets not used
      dalam operasi                      8,999,230       1,056,080     (2,020,434)           647,126        (1,086,708)         7,595,294                      in operations

     Jumlah                            115,761,107      47,760,119     (2,858,822)      (51,628,870)       (73,325,207)        35,708,327                                 Total

     Penyisihan penurunan nilai          3,810,473         111,280         (2,082)         (3,641,604)                -           278,067                             Subtotal

     Jumlah tercatat                  1,448,970,621                                                                         1,511,901,240                 Net carrying value




     Beban penyusutan dialokasikan sebagai berikut:                                           Depreciation expense was allocated as follows:

                                                                      2025                             2024
                                                                 (Enam bulan/                      Enam bulan/
                                                                  Six months)                      Six months)

       Beban usaha                                                     25,010,289                        22,493,076                              Operating expenses
       Aset dalam pembangunan                                             140,437                            15,555                           Construction in progress
       Beban lain-lain                                                    759,897                           572,653                                  Other expenses

       Jumlah                                                          25,910,623                        23,081,284                                                           Total
Page 70
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/60 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                             FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                        JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)    (Expressed in millions of Rupiah, unless otherwise stated)

6.   ASET TETAP (lanjutan)                                  6.   PROPERTY,        PLANT        AND      EQUIPMENT
                                                                 (continued)

     Grup memiliki beberapa bidang hak atas tanah                The Group owns several pieces of land rights with
     dengan hak legal berupa Hak Pakai dan Hak Guna              Rights to Use and Building Use Rights (“HGB”).
     Bangunan (“HGB”). Hak Pakai tidak mempunyai                 Rights to Use have no expiration date while HGB will
     jangka waktu sedangkan HGB Perusahaan jatuh                 expire from 2025 to 2051, but they are renewable by
     tempo antara tahun 2025 sampai dengan 2051,                 the Group. The Group also has several pieces of
     tetapi dapat diperpanjang oleh Grup. Grup juga              land rights with HGB, which are still in an extension
     mempunyai beberapa bidang hak atas tanah                    process. The Group has recently purchased land
     dengan HGB yang sedang dalam proses                         rights which are in the process of transfer of
     perpanjangan. Grup telah membeli hak atas tanah             certificates to the name of the Group.
     yang sedang dalam pengurusan balik nama menjadi
     atas nama Grup.

     Pada tanggal 30 Juni 2025, bangunan, instalasi dan          As at June 30, 2025, the buildings, installations and
     mesin pembangkit, perlengkapan transmisi,                   power plants, transmission equipment, other
     perlengkapan pengolahan data dan telekomunikasi             telecommunications      and     data      processing
     lainnya serta kapal diasuransikan dengan jumlah             equipment and vessels were insured with total
     pertanggungan sebesar USD24.960.684.913 (nilai              insurance coverage of USD24,960,684,913 (nilai
     penuh) atau setara dengan Rp405.136.877                     penuh) or equivalent to Rp405,136,877 (December
     (Desember 2024: USD24.593.721.735 (nilai penuh)             2024: USD24,593,721,735 (full amount) or
     atau    setara  dengan     Rp397.360.762)      dan          equivalent to Rp397,360,762) and Rp10,798,664
     Rp10.798.664 (Desember 2024: Rp7.927.060).                  (December 2024: Rp7,927,060).

     Harga perolehan aset tetap yang telah disusutkan            The acquisition costs of property, plant and
     penuh dan masih digunakan pada tanggal 30 Juni              equipment that have been fully depreciated but are
     2025 dan 31 Desember 2024 masing-masing                     still in use as at June 30, 2025 and December 31,
     sebesar Rp26.288.232 dan Rp21.793.817.                      2024 amount to Rp26,288,232 and Rp21,793,817
                                                                 respectively.

     Revaluasi aset                                              Asset revaluation

     Pada tahun 2024, manajemen mempekerjakan                    In   2024,     management       engaged      external
     penilai eksternal independen dan berkualifikasi             independent and qualified valuers, Kantor Jasa
     untuk menentukan nilai wajar aset tetap yaitu Kantor        Penilai Publik Rengganis, Hamid & Rekan (‘’KJPP
     Jasa Penilai Publik Rengganis, Hamid & Rekan                RHR’’), to determine the fair value of property, plant
     (‘’KJPP RHR’’). KJPP RHR merupakan penilai                  and equipment. KJPP RHR is an independent
     independen yang telah terdaftar di Kementerian              valuer registered with the Ministry of Finance and
     Keuangan dan OJK.                                           FSA.
Page 71
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                     Lampiran 5/61 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                       FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                  JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)              (Expressed in millions of Rupiah, unless otherwise stated)

6.   ASET TETAP (lanjutan)                                        6.      PROPERTY,             PLANT          AND       EQUIPMENT
                                                                          (continued)

     Revaluasi aset (lanjutan)                                            Asset revaluation (continued)

     Tabel di bawah ini menganalisis aset tetap yang                      The table below analyses fixed assets recorded at fair
     dicatat pada nilai wajar berdasarkan hierarki nilai                  value, based on the fair value hierarchy in SFAS No.
     wajar sesuai dengan PSAK No. 113 dan berdasarkan                     113 and based on valuation as at December 31, 2024
     valuasi pada tanggal 31 Desember 2024 sebagai                        as follows:
     berikut:
                                       Tingkat pengukuran nilai wajar 31 Desember 2024 menggunakan/
                                             Fair value measurement at December 31, 2024 using
                                      Tingkat 1/         Tingkat 2/        Tingkat 3/        Jumlah/
                                       Level 1            Level 2           Level 3           Total

     Pengukuran nilai wajar                                                                                            Recurring fair value
       berulang                                                                                                            measurement
     Hak atas tanah                              -        37,540,085           144,226,631       181,766,716                     Land rights
     Bangunan, waduk                                                                                               Buildings, reservoirs and
       dan prasarana                             -         6,912,544            83,792,484        90,705,028                infrastructure
     Instalasi dan mesin                                                                                            Installations and power
       pembangkit                                -                 -           584,282,646       584,282,646                        plants
     Perlengkapan transmisi                      -                 -           278,330,626       278,330,626       Transmission equipment
     Perlengkapan distribusi                     -                 -           264,960,966       264,960,966         Distribution equipment
     Perlengkapan pengolahan
       data dan telekomunikasi data                                                                               Telecommunications and
       yang digunakan dalam                                                                                        processing equipment
       penyediaan listrik                        -                 -             7,452,747         7,452,747    used for electricity supply
     Material cadang utama                       -                 -             5,580,835         5,580,835               Major spare parts

     Jumlah                                      -        44,452,629          1,368,626,935    1,413,079,564                          Total

     -    Harga dikutip (tidak disesuaikan) dari pasar                    -       Quoted prices (unadjusted) in active markets
          yang aktif untuk aset atau liabilitas yang identik                      for identical assets or liabilities (Level 1);
          (Tingkat 1);
     -    Input selain harga yang dikutip dari pasar yang                 -       Inputs other than quoted prices included within
          disertakan pada Tingkat 1 yang dapat                                    Level 1 that are observable for the asset or
          diobservasi untuk aset dan liabilitas, baik                             liability, either directly (that is, as prices) or
          secara langsung (yaitu sebagai sebuah harga)                            indirectly (that is, derived from prices) (Level 2);
          atau secara tidak langsung (yaitu sebagai                               and
          turunan dari harga) (Tingkat 2); dan
     -    Input untuk aset atau liabilitas yang tidak                     -       Inputs for the asset or liability that are not based
          didasarkan pada data pasar yang dapat                                   on observable market data (that is,
          diobservasi (informasi yang tidak dapat                                 unobservable inputs) (Level 3).
          diobservasi) (Tingkat 3).

     Tidak terdapat aset tetap yang bisa digolongkan ke                   There were no property, plant and equipment which
     dalam nilai wajar Tingkat 1.                                         could be classified at Level 1 fair value.

     Tidak terdapat transfer antara Tingkat 1 dan Tingkat 2               There were no transfers between Level 1 and Level 2
     selama tahun berjalan.                                               during the year.

     Nilai wajar Tingkat 2 dari hak atas tanah dihitung                   The Level 2 fair value of land rights is calculated using
     dengan menggunakan pendekatan pasar dan                              the market approach and income approach, while the
     pendekatan      pendapatan,     sedangkan   untuk                    value of building, reservoirs and infrastructure is
     bangunan, waduk dan prasarana menggunakan                            calculated using the cost approach. Data inputs were
     pendekatan biaya. Input yang diperoleh dari                          obtained from the market approach that consists of the
     pendekatan pasar yaitu:                                              following:
     a. Harga jual atau harga sewa per meter persegi;                     a. Sale or rental price per square metre;
     b. Tingkat hunian;                                                   b. Occupancy rate;
     c. Tingkat pertumbuhan;                                              c. Growth rate;
     d. Tingkat diskonto dan kapitalisasi;                                d. Discount and capitalisation rate;
     e. Biaya pembuatan baru per meter persegi;                           e. Replacement cost new per square metre;
     f. Tingkat depresiasi;                                               f. Depreciation rate;
     g. Biaya operasional;                                                g. Operational expense;
     h. Keuntungan pengembangan; dan                                      h. Developers margin; and
     i. Indeks kemahalan konstruksi.                                      i. Construction cost index.
Page 72
                       PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                    DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                 Lampiran 5/62 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                  NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                         FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                                    JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                (Expressed in millions of Rupiah, unless otherwise stated)

6.   ASET TETAP (lanjutan)                                                             6.         PROPERTY,               PLANT             AND      EQUIPMENT
                                                                                                  (continued)

     Revaluasi aset (lanjutan)                                                                    Asset revaluation (continued)

     Rekonsiliasi atas saldo awal terhadap saldo akhir                                            Reconciliation of the beginning balances to the
     dari pengukuran nilai wajar dengan menggunakan                                               closing balances of the fair value measurements
     informasi signifikan yang tidak dapat diobservasi                                            using significant unobservable inputs (Level 3) is as
     (Tingkat 3) adalah sebagai berikut:                                                          follows:
                                                                                                                    Jumlah yang
                                                                                                                      diakui pada
                                                                                   Jumlah yang diakui pada           penghasilan
                                                                                           laba rugi/               komprehensif
                                                                                    Amount recognised in             lain/Amount
                                                                                         profit or loss               recognised
                                1 Januari/                                                           Penurunan          in other     31 Desember/
                                 January       Penambahan/     Reklasifikasi/     Depresiasi/           nilai/     comprehensive      December
                                   2024          Additions    Reclassification   Depreciation       Impairment          income           2024

     Hak atas tanah             130,181,325           4,241          5,527,110                -          (8,229)         8,522,184    144,226,631                   Land rights
     Bangunan umum,                                                                                                                                         Building, reservoirs
       waduk dan prasarana       69,363,365         221,578         14,967,252      (2,590,154)         (56,702)         1,887,145     83,792,484       and infrastructures
     Instalasi dan                                                                                                                                                 Installations
       mesin pembangkit         518,626,189       1,839,864         46,004,020     (19,812,838)        (333,967)        37,959,378    584,282,646        and power plants
     Perlengkapan transmisi     259,661,371         162,193         15,311,393      (8,540,602)        (458,317)        12,194,588    278,330,626    Transmissions equipment
     Perlengkapan distribusi    247,726,906          89,185         21,278,548     (11,067,922)        (214,750)         7,148,999    264,960,966      Distributions equipment
     Perlengkapan
       pengolahan data                                                                                                                                   Telecommunications
       dan telekomunikasi                                                                                                                             and data processing
       yang digunakan dalam                                                                                                                            equipment used for
       penyediaan listrik         6,333,876          40,113          2,848,857      (2,335,356)          (3,290)           568,547       7,452,747        electricity supply
     Material cadangan utama      3,502,464         331,800          1,720,907        (106,788)             247            132,205       5,580,835           Major spare parts

     Jumlah                    1,235,395,496      2,688,974        107,658,087     (44,453,660)      (1,075,008)        68,413,046   1,368,626,935                        Total


     Nilai wajar Tingkat 3 dihitung dengan menerapkan                                             The Level 3 fair value is calculated through the market
     pendekatan pasar, pendekatan pendapatan, dan                                                 approach, income approach, and cost approach by
     pendekatan biaya dengan menggunakan input yang                                               using unobservable inputs.
     tidak dapat diobservasi.
Page 73
                                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                                             Lampiran 5/63 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                                                         NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                                                                FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                                                                           JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                                                       (Expressed in millions of Rupiah, unless otherwise stated)

6.   ASET TETAP (lanjutan)                                                                                                 6.       PROPERTY,                               PLANT                  AND                EQUIPMENT
                                                                                                                                    (continued)

     Revaluasi aset (lanjutan)                                                                                                      Asset revaluation (continued)

     Informasi mengenai pengukuran nilai wajar yang                                                                                 Information about fair value measurements using
     menggunakan informasi signifikan yang tidak dapat                                                                              significant unobservable inputs (Level 3) are as
     diobservasi (Tingkat 3) adalah sebagai berikut:                                                                                follows:

                                                                                                                                                  Kisaran input
                                                                                                                                                   yang tidak
                                                                                                                                                       dapat                      Hubungan
                                                                                                                    Informasi                      diobservasi               informasi yang tidak
                                                                                                                    yang tidak                    yang dipakai/                dapat diobservasi
                                                                                Teknik                                 dapat                        Range of                 terhadap nilai wajar/
                                                                              penilaian/                           diobservasi/                   unobservable                  Relationship of
                                                                              Valuation                           Unobservable                        inputs                     unobservable
                                                                              technique                               inputs                           used                   inputs to fair value
     Hak atas tanah                                                                                                                                                                                                                       Land rights

     Tapak Tower                                                 Pendekatan biaya                        - Luas Right of Way (“ROW”)/            60.00% - 70.00%*       -   Semakin tinggi luas dan                                 Land for tower site
                                                                   dengan metode                            ROW area                                                        kompensasi ROW
                                                                   penjumlahan/                                                                                             maka semakin
                                                                   The cost approach                                                                                        tinggi nilai wajar/
                                                                   with the summation                                                                                       The higher the ROW area
                                                                   method                                                                                                   and compensation
                                                                                                                                                                            the higher the fair value
                                                                                                         - Kompensasi ROW/
                                                                                                            Compensation ROW
     Tanah gardu dan pembangkit                                  Pendekatan pendapatan                   - Peruntukan sesuai                     60.00% - 80.00%*       -   Semakin tinggi koefisien                                Land for substation
                                                                   dengan metode                            pengembangan/                                                   luas bangunan (“KLB”)                                     and power plant
                                                                   pengembangan lahan/                      Adjustment of parameter                                         maka semakin
                                                                   The income approach                      development                                                     tinggi nilai wajar/
                                                                   with the land                                                                                            The higher the KLB,
                                                                   development method                                                                                       the higher the fair value
                                                                                                         - Data luas dan aspek legal/                                   -   Tanah bersertifikat akan
                                                                                                            Land area and legal                                             memiliki nilai wajar
                                                                                                            aspects                                                         lebih tinggi/
                                                                                                                                                                            Certified land will have
                                                                                                                                                                            higher fair value
                                                                                                         - Perubahan peruntukan/                                        -   Peruntukan tanah sekitar
                                                                                                            Zoning changes                                                  mengindikasikan nilai wajar
                                                                                                                                                                            yang lebih tinggi/
                                                                                                                                                                            Zoning of neighboring land
                                                                                                                                                                            might have higher fair value
      Bangunan                                                                                                                                                                                                                              Buildings

      Bangunan umum                                              Pendekatan biaya/                       - Indeks koefisien/                        1.50 - 6.91         -   Semakin besar                                            General buildings
                                                                   Cost approach                            Index coefficient                                               indeks koefisien maka
                                                                                                                                                                            semakin tinggi nilai wajar/
                                                                                                                                                                            The higher the index coefficient,
                                                                                                                                                                            the higher the fair value
                                                                                                         - Volume bangunan/                      60.00% - 70.00%*       -   Semakin besar volume
                                                                                                            Building volumes                                                maka semakin tinggi
                                                                                                                                                                            nilai wajar/
                                                                                                                                                                            The higher building
                                                                                                                                                                            volumes, the higher the fair value
      Waduk dan prasarana                                        Tren/                                   - Indeks koefisien/                        1.00 - 2.57         -   Semakin besar tingkat                      Reservoirs and infrastructures
                                                                   Trending                                 Index coefficient                                               indeks maka semakin
                                                                                                                                                                            tinggi nilai wajar/
                                                                                                                                                                            The higher the index coefficient,
                                                                                                                                                                            the higher the fair value
      Instalasi dan mesin                                        Pendekatan biaya/                       - Tingkat kemunduran                     1.00% - 71.00%        -   Semakin besar tingkatnya,                                Installations and
        pembangkit                                                 Cost approach                             fungsional/                                                    maka semakin                                                 power plants
                                                                                                             Functional                                                     rendah nilai wajar/
                                                                                                             obsolescence rate                                              The higher the rate,
                                                                                                                                                                            the lower the fair value
                                                                                                         - Nilai pengganti baru/                 50.00% - 60.00%        -   Semakin besar tingkatnya,
                                                                                                            RCN                                                             maka semakin
                                                                                                                                                                            rendah nilai wajar/
                                                                                                                                                                            The higher the rate,
                                                                                                                                                                            the lower the fair value
                                                                                                         - Tingkat indeks PPI/                      1.00 - 3.80         -   Semakin besar tingkat
                                                                                                            PPI index rate                                                  indeks PPI maka semakin
                                                                                                                                                                            tinggi nilai wajar/
                                                                                                                                                                            The higher the PPI index rate,
                                                                                                                                                                            the higher the fair value
      Perlengkapan transmisi                                     Pendekatan biaya/                       - Tingkat indeks PPI/                      1.00 - 1.50         -   Semakin besar tingkat                        Transmissions equipment
                                                                   Cost approach                            PPI index rate                                                  indeks PPI maka semakin
                                                                                                                                                                            tinggi nilai wajar/
                                                                                                                                                                            The higher the PPI index rate,
                                                                                                                                                                            the higher the fair value
          Perlengkapan distribusi                                Pendekatan biaya/                       - Tingkat indeks PPI/                      1.00 - 1.82         -   Semakin besar tingkat                             Distributions equipment
                                                                   Cost approach                            PPI index rate                                                  indeks PPI maka semakin
                                                                                                                                                                            tinggi nilai wajar/
                                                                                                                                                                            The higher the PPI index rate,
                                                                                                                                                                            the higher the fair value
          Perlengkapan pengolahan                                Pendekatan biaya/                       - Tingkat indeks PPI/                      1.01 - 1.10         -   Semakin besar tingkat                              Telecommunications
           data dan telekomunikasi                                 Cost approach                            PPI index rate                                                  indeks PPI maka semakin                             and data processing
           yang digunakan dalam                                                                                                                                             tinggi nilai wajar/                               equipment used for
           penyediaan listrik                                                                                                                                               The higher the PPI index rate,               electricity supply
                                                                                                                                                                            the higher the fair value

          Material cadang utama                                  Pendekatan biaya/                       - Tingkat indeks PPI/                      1.00 - 3.80         -   Semakin besar tingkat                                   Major spare parts
                                                                   Cost approach                            PPI index rate                                                  indeks PPI maka semakin
                                                                                                                                                                            tinggi nilai wajar/
                                                                                                                                                                            The higher the PPI index rate,
                                                                                                                                                                            the higher fair value

     *)     Terdapat banyak input yang tidak dapat diobservasi. Hal ini merepresentasikan kisaran bobot dari input yang tidak dapat diobservasi./There are too many unobservable inputs. This represents the weights of the
            unobservable inputs.
Page 74
                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/64 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                          NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                 FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                            JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)        (Expressed in millions of Rupiah, unless otherwise stated)

6.   ASET TETAP (lanjutan)                                   6.     PROPERTY,            PLANT       AND        EQUIPMENT
                                                                    (continued)

     Revaluasi aset (lanjutan)                                      Asset revaluation (continued)

     Perubahan surplus revaluasi, dikurangi dengan                  The changes in revaluation surplus, net of applicable
     penghasilan pajak tangguhan yang terkait, yang                 deferred income taxes, were charged to other
     dibebankan pada penghasilan komprehensif lain dan              comprehensive income and are presented in property,
     disajikan sebagai surplus revaluasi aset tetap dalam           plant and equipment revaluation surplus in the
     laporan perubahan ekuitas konsolidasian.                       consolidated statements of changes in equity.

     Mutasi surplus revaluasi aset tetap adalah sebagai             The movements of property, plant and equipment
     berikut:                                                       revaluation surplus are as follows:

                                                  30 Juni/             31 Desember/
                                                  June 30,             December 31,
                                                    2025                   2024

       Saldo awal                                 727,820,918             688,394,826                        Beginning balance
       Kenaikan surplus revaluasi                                          48,461,883           Increase on revaluation surplus
       Penghapusan aset tetap                        (576,082)                                  Disposals of property, plant and
                                                                                                                     equipment
                                                     (576,082)             48,461,883
       Reklasifikasi surplus revaluasi                                                    Reclassification of revaluation surplus
         ke saldo laba atas aset tetap                                                      to retained earnings from disposals
         yang telah dijual                                   -               (547,339)         of property, plant and equipment
       Beban pajak terkait                                   -             (8,488,452)            Related income tax expense



       Saldo akhir                                727,244,836             727,820,918                          Ending balance

     Selain menggunakan input yang berasal dari pasar,              Other than the data inputs observed from the market,
     KJPP RHR juga menggunakan input yang tidak                     KJPP RHR also used unobservable market data
     dapat diobservasi dari pasar dan menggunakan                   inputs and used special assumptions where
     asumsi khusus dimana penyesuaian dilakukan                     adjustments were made based on size, capacity, age,
     berdasarkan ukuran, kapasitas, usia, lokasi, bentuk            location, shapes and specifications, land rights and
     dan spesifikasi, hak atas tanah, dan elemen                    other comparison elements.
     perbandingan lainnya.

     Jika Grup tidak menerapkan model revaluasi, nilai              If the Group did not apply the revaluation model, the
     tercatat bersih aset tetap Perusahaan pada tanggal             net carrying value of property, plant and equipment as
     30 Juni 2025 dan 31 Desember 2024 masing-                      at June 30, 2025 and December 31, 2024 would have
     masing        sebesar       Rp749.624.122     dan              amounting to Rp749,624,122 and Rp763,314,898,
     Rp763.314.898.                                                 respectively.
Page 75
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/65 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                             FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                        JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)    (Expressed in millions of Rupiah, unless otherwise stated)

6.   ASET TETAP (lanjutan)                                  6.   PROPERTY,            PLANT    AND       EQUIPMENT
                                                                 (continued)

     Aset dalam pembangunan                                      Construction in progress

     Akun ini merupakan biaya-biaya yang terjadi                 This account represents costs incurred in relation to
     sehubungan dengan pembangunan dan renovasi/                 the construction and renovation/preparation of power
     persiapan sarana kelistrikan, sebagai berikut:              supply facilities, as follows:


                                             30 Juni/              31 Desember/
                                             June 30,              December 31,
                                               2025                    2024

      Proyek penugasan                                                                             Mandatory project -
      Program percepatan                                                                            Fast track program
      Pembangkitan                             4,578,327                 5,015,078             Power plants
      Transmisi                                5,108,398                 5,108,398                        Transmission

      Subjumlah                                9,686,725                10,123,476                             Subtotal

      Konstruksi rutin                                                                             Regular construction
      Pembangkitan                            34,598,329                35,998,071                       Power plants
      Transmisi                               31,133,336                25,954,306                       Transmission
      Distribusi                              11,487,235                10,194,570                          Distribution
      Perlengkapan                               433,601                   322,512                          Equipment

      Subjumlah                               77,652,501                72,469,459                            Subtotal

      Jumlah                                  87,339,226                82,592,935                                Total




     (i) Program percepatan                                      (i)   Fast track program

          Program percepatan (fast track program)                      The fast track program represents projects which
          merupakan       proyek    yang    ditugaskan                 are mandated by the Government to the Group.
          Pemerintah kepada Grup. Aset dalam                           Construction in progress under the fast track
          pembangunan untuk program percepatan                         program includes advance payments made to the
          termasuk pembayaran uang muka kepada                         contractors, borrowing costs and other
          kontraktor, biaya pinjaman serta pengeluaran                 capitalised expenditures.
          lain yang dikapitalisasi.

          Pembangkitan                                                 Power plants

          Program percepatan aset dalam pembangunan                    The fast track program of power plants under
          pembangkitan terutama merupakan PLTU                         construction consists mainly of PLTU Lombok 2
          Lombok 2 (2x50 MW), PLTU 1 Kalimantan                        (2x50 MW), PLTU 1 Kalimantan Barat – Parit
          Barat – Parit Baru 2x50 MW, dan PLTU 2                       Baru 2x50 MW, and PLTU 2 Kalimantan Barat
          Kalimantan Barat Bengkayang 2x27,5 MW.                       Bengkayang 2x27,5 MW.

          Transmisi                                                    Transmission

          Program percepatan aset dalam pembangunan                    The fast track program of transmission and
          transmisi dan gardu induk antara lain proyek                 substation under construction mainly consists of
          SUTT 150 kV Blang Pidie – Tapak Tuan.                        projects such as Overhead Powerline SUTT 150
                                                                       kV Blang Pidie – Tapak Tuan.
Page 76
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/66 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                             FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                        JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)    (Expressed in millions of Rupiah, unless otherwise stated)

6.   ASET TETAP (lanjutan)                                  6.   PROPERTY,          PLANT      AND      EQUIPMENT
                                                                 (continued)

     Aset dalam pembangunan (lanjutan)                           Construction in progress (continued)

     (ii) Konstruksi rutin                                       (ii) Regular construction

         Pembangkitan                                                Power plants

         Aset dalam pembangunan untuk pembangkitan                   Power plants under construction consist mainly of
         terutama merupakan PLTA Upper Cisokan                       PLTA        Upper       Cisokan         Pumped
         Pumped Storage (UCPS) (4x260 MW), PLTA                      Storage (UCPS) (4x260 MW), PLTA Peusangan
         Peusangan 2x88 MW, dan PLTU Sulut 1 2x50                    2x88 MW, dan PLTU Sulut 1 2x50 MW
         MW.

         Transmisi                                                   Transmission

         Aset dalam pembangunan transmisi terutama                   Transmission under construction consists mainly
         merupakan proyek jaringan transmisi 500 kV                  of projects of transmission lines of 500 kV in
         untuk Sumatera, Jawa - Bali, 150 kV untuk luar              Sumatera, Java - Bali, 150 kV outside Sumatera,
         Sumatera, Jawa - Bali, proyek gardu induk                   Java - Bali, substations of 150 kV and
         150 kV serta proyek interkoneksi jaringan.                  interconnection of transmission projects.

         Distribusi                                                  Distribution

         Aset dalam pembangunan distribusi terutama                  Distribution under construction consists mainly of
         merupakan proyek jaringan distribusi tegangan               projects of mid and low voltage distribution lines
         menengah dan rendah 20 kV serta proyek                      of 20 kV and distribution substation projects.
         gardu distribusi.

         Perlengkapan                                                Equipment

         Perlengkapan untuk aset dalam pembangunan                   Equipment under construction consists of
         termasuk materi dan perlengkapan khusus                     specialised materials and equipment used to
         yang digunakan untuk menunjang fungsi                       support the generation and distribution of
         pembangkitan dan distribusi listrik.                        electricity.

     Pada tanggal 30 Juni 2025 estimasi persentase               As at June 30, 2025, the estimated percentage of
     jumlah tercatat aset dalam pembangunan Grup                 completion of the Group’s construction in progress
     terhadap nilai kontrak adalah sebagai berikut:              projects was as follows:
                                                                                                     Persentase
                                                                                                   penyelesaian/
                                                                                Nilai/               Percentage
                      Nama Proyek/Project Name                                 Amount              of completion

     PLTA Peusangan                                                                   9,745,190               97%
     PLTA Upper Cisokan Pumped Storage                                                5,437,706               9%
     PLTU Lombok FTP 2 (2x50 MW)                                                      3,756,504               89%
     SUTET 275 kV Gumawang - Lampung 1                                                2,064,970               84%
     PLTU Kalbar 1 - Parit Baru (2 x 50 MW)                                           1,718,887               86%
     PLTU Sorong Ex. Timika (4 x 7 MW)                                                1,066,307               57%
     SUTET 500 KV Muara Enim - New Aur Duri                                           1,025,223               34%
     SUTT 150 kV Tayan - Sandai                                                         879,329               88%
     SUTET 500 kV Priok - Muara Tawar                                                   813,086               66%
     SUTET 500 kV Muara Tawar - Bekasi                                                  786,338               80%
     Transmisi lainnya/Various transmission line                                     30,672,789               2%-98%
     Pembangkitan lainnya /other power plants                                        17,452,061               2%-98%
     Lainnya/Others                                                                  11,920,836               2%-98%

     Jumlah/Total                                                                    87,339,226
Page 77
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                 Lampiran 5/67 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                       NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                              FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                         JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)     (Expressed in millions of Rupiah, unless otherwise stated)

6.    ASET TETAP (lanjutan)                                  6.   PROPERTY,         PLANT       AND       EQUIPMENT
                                                                  (continued)

      Aset dalam pembangunan (lanjutan)                           Construction in progress (continued)

      Selama tahun berjalan, terdapat beberapa transfer           During the year, there were some partial transfer of
      parsial aset dalam pembangunan menjadi aset                 construction in progress to property, plant and
      tetap di beberapa proyek seperti PLTU 1 Sulut,              equipment in several projects such as PLTU 1 Sulut,
      PLTU Palu 3 dan PLTA Peusangan karena                       PLTU Palu 3 and PLTA Peusangan due to some parts
      beberapa bagian dari proyek tersebut telah selesai.         of the project had been completed.

      Pada tanggal 31 Desember 2024, estimasi                     As at December 31, 2024, the estimated percentage
      persentase     jumlah tercatat   aset    dalam              of completion of the Group’s construction in progress
      pembangunan Grup terhadap nilai kontrak adalah              projects was as follows:
      sebagai berikut:

                                                                                                        penyelesaian/
                                                                                  Nilai/                 Percentage
                        Nama Proyek/Project Name                                 Amount                 of completion

      PLTA Peusangan                                                                    9,145,230           97%
      PLTA Upper Cisokan Pumped Storage                                                 5,065,707       LOT 1A: 7,67%
                                                                                                        LOT 1B: 5,05%
      PLTU Lombok FTP 2 (2x50 MW)                                                       3,591,305           88%
      PLTU Sulut-1 (2x50 MW)                                                            3,158,459           99%
      PLTU Kalselteng 2 - 2X100 MW (Asam-Asam)                                          2,017,057          99.9%
      PLTU Kalbar 1 - Parit Baru (2 x 50 MW)                                            1,714,347           86%
      SUTET 275 kV Gumawang - Lampung 1                                                 1,662,337           68%
      PLTU Sorong Ex. Timika (4 x 7 MW)                                                 1,139,296           55%
      SUTET 500 KV Muara Enim - New Aur Duri                                            1,018,510           34%
      USC 150 kV Interkoneksi Bangka - Sumsel (line 2)                                    798,577          99.9%
      Transmisi lainnya/Various transmission line                                      27,583,281         2%-98%
      Pembangkitan lainnya/other power plants                                          15,181,747         2%-98%
      Lainnya/Others                                                                   10,517,082         2%-98%

     Jumlah/Total                                                                      82,592,935


      Setelah penyelesaian suatu proyek, masih perlu              After completion of a project, there are still a number
      dilakukan sejumlah pengujian-pengujian sebelum              of tests that need to be performed during the
      proyek aset dalam pembangunan menerima                      commissioning phase before the projects are Certified
      Sertifikat Laik Operasi.                                    for Operations.

      Selama tahun berjalan, Grup telah mengapitalisasi           During the year, the Group has capitalised borrowing
      biaya pinjaman mencakup bunga pinjaman dan                  costs including interest expense and foreign exchange
      selisih kurs mata uang asing ke pekerjaan dalam             differences to construction in progress amounting to
      pelaksanaan aset dalam pembangunan sebesar                  Rp3,045,547 (Juni 2024: Rp3,055,508). Borrowing
      Rp3.045.547 (Juni 2024: Rp3.055.508). Biaya                 costs were capitalised at the weighted average rate of
      pinjaman dikapitalisasi pada tingkat bunga rata-rata        general borrowings of 5.86% in 2024 (June 2024:
      tertimbang dari pinjaman umum yaitu sebesar                 5.89%).
      5,86% pada tahun 2025 (Juni 2024: 5,89%).

      Aset tidak digunakan dalam operasi                          Assets not used in operations

      Aset tidak digunakan dalam operasi meliputi aset            Assets not used in operations comprised property,
      tetap yang akan direlokasi, sementara belum                 plant and equipment to be relocated, those
      digunakan dalam operasi, serta aset akan                    temporarily not in use in operations, and assets to be
      diperbaiki.                                                 repaired.
Page 78
                       PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                    DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                              Lampiran 5/68 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                         NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                           JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                       (Expressed in millions of Rupiah, unless otherwise stated)

6.   ASET TETAP (lanjutan)                                                  6.        PROPERTY,               PLANT        AND        EQUIPMENT
                                                                                      (continued)

     Aset tidak digunakan dalam operasi (lanjutan)                                    Assets not used in operations (continued)

     Kerugian penurunan nilai dari penghapusan aset                                   Loss on impairment of assets not used in operations
     yang tidak digunakan dalam operasi untuk periode                                 for six month periods ended June 30, 2025 and 2024
     enam bulan yang berakhir pada tanggal 30 Juni                                    amounting      to   Rp759,897     and     Rp572,653,
     2025 dan 2024 masing-masing sebesar Rp759.897                                    respectively, which are presented as part of the other
     dan Rp572.653 yang disajikan sebagai bagian dari                                 income/(expense) - net (Note 46).
     pendapatan/(beban) lain-lain - bersih (Catatan 46).

     Keuntungan penjualan aset tertentu yang tidak                                    Gain on sale of certain assets not used in operations
     digunakan dalam operasi untuk tahun yang berakhir                                for the years ended June 30, 2025 and 2024
     pada tanggal 30 Juni 2025 dan 2024 masing-                                       amounting to Rp122,531 and Rp45,372, respectively
     masing adalah sebesar Rp122.531 dan Rp45.372                                     (Note 46).
     (Catatan 46).

     Berdasarkan penelaahan manajemen, manajemen                                      Based on management’s assessment, management
     berpendapat bahwa penyisihan penurunan nilai                                     is of the opinion that the provision for impairment is
     Grup adalah cukup untuk menutupi kemungkinan                                     adequate to cover the possible impairment losses of
     adanya kerugian yang timbul dari nilai tercatat aset                             the carrying amount of property, plant and equipment
     tetap pada tanggal 30 Juni 2025 dan 2024.                                        as at June 30, 2025 and 2024.


7.   ASET HAK GUNA                                                          7.        RIGHT-OF-USE ASSETS


                                                                                    30 Juni / June 30, 2025
                                          Saldo Awal/             Penambahan/               Pengurangan/         Reklasifikasi/         Saldo Akhir/
                                       Beginning Balance           Additions                  Deductions       Reclassifications      Ending Balance
      Biaya Perolehan :
      Tanah dan Hak atas Tanah                    1,529,077                     -                        -               981,131            2,510,208
      Bangunan umum waduk
       dan prasarana                              2,954,284             71,724                       3,040                      -           3,022,968
      Instalasi dan Mesin                        43,283,025              4,661                           -            (1,446,172)          41,841,514
      Perlengkapan distribusi                     1,568,833                  -                           -                      -           1,568,833
      Perlengkapan Umum                             125,442             28,117                      29,073               (33,830)              90,656
      Kendaraan Bermotor dan                      4,860,836            542,472                     135,472                 38,974           5,306,811
     Alat yang Mobil
      Perlengkapan pengolahan
     data dan telekomunikasi                              -                     -                        -                      -                   -
                                                  3,106,239                     -                        -                      -           3,106,239
     Kapal dan perlengkapan

     Jumlah                                      57,427,736            646,974                     167,584             (459,897)           57,447,229

     Akumulasi Penyusutan
      Tanah dan Hak atas Tanah                      137,484              67,455                          -                 203,286             408,225
      Bangunan umum waduk dan prasarana           1,392,383             149,001                      3,040                  (5,634)          1,532,710
      Instalasi dan Mesin                        23,389,916             896,038                    125,709                  77,186          24,237,431
     Perlengkapan distribusi                        162,678              75,082                          -                        -            237,760
     Perlengkapan Umum                              100,526              14,308                     63,634                      788             51,988
      Kendaraan Bermotor dan Alat yang Mobil      2,424,693             597,141                    141,922               (176,706)           2,703,206
      Perlengkapan pengolahan data dan
     telekomunikasi                                       -                   -                          -                       -                   -
      Kapal dan perlengkapan                        451,820              69,571                          -                       -             521,391
      Jumlah                                     28,059,500           1,868,596                    334,305                  98,919          29,692,709

     Jumlah tercatat                             29,368,236                                                                                 27,754,519
Page 79
                     PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                  DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                             Lampiran 5/69 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                             NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                    FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                               JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                           (Expressed in millions of Rupiah, unless otherwise stated)


7.   ASET HAK GUNA (lanjutan)                                                      7.    RIGHT-OF-USE ASSETS (continued)
                                                               31 Desember/December 31, 2024
                                                                                                         Selisih kurs
                                                                                                               dari
                                                                                                         penjabaran
                                                                                                             laporan
                                                                                                          keuangan/
                                                                                    Reklasifikasi          Exchange
                                                                                         dan             differences
                                                                                    penyesuaian/              due to
                               Saldo awal/                                         Reclassification         financial       Saldo akhir/
                               Beginning       Penambahan/       Pengurangan/            and              statements          Ending
                                balance          Additions        Deductions         adjustments         translations        balance

     Biaya perolehan                                                                                                                                                At cost
     Hak atas tanah               1,490,380           12,712             (2,572)             28,557                     -        1,529,077                     Land rights
     Bangunan umum, waduk                                                                                                                        Buildings, reservoirs and
       dan prasarana              3,023,161           15,500               (852)            (83,525)                    -        2,954,284                infrastructure
     Instalasi dan mesin
       pembangkit                43,335,756                -            (83,826)            (14,130)            45,225          43,283,025 Installations and power plants
     Perlengkapan distribusi      1,501,637           81,515            (14,319)                  -                  -           1,568,833         Distribution equipment
     Perlengkapan umum              157,317           22,608            (54,483)                  -                  -             125,442             General equipment
     Kendaraan bermotor           3,615,409        1,661,194           (236,373)           (179,394)                 -           4,860,836                 Motor vehicles
     Kapal dan perlengkapan       2,316,459        1,330,955           (569,891)             28,716                  -           3,106,239        Vessels and equipment

     Jumlah                      55,440,119        3,124,484           (962,316)           (219,776)            45,225          57,427,736                            Total


     Akumulasi penyusutan                                                                                                                        Accumulated depreciation
     Hak atas tanah                  96,455           42,546             (1,517)                   -                    -          137,484                      Land rights
     Bangunan umum, waduk                                                                                                                         Buildings, reservoirs and
       dan prasarana              1,184,876          282,543            (11,368)            (63,668)                    -        1,392,383                 infrastructure
     Instalasi dan mesin
       pembangkit                21,429,780        1,930,135            (48,025)             68,337              9,689          23,389,916 Installations and power plants
     Perlengkapan distribusi          12,514         150,164                  -                    -                 -             162,678            Distribution equipment
     Perlengkapan umum              106,161           48,568            (52,645)              (1,558)                -             100,526             General equipment
     Kendaraan bermotor           1,806,240        1,174,609           (480,211)            (75,945)                 -           2,424,693                   Motor vehicles
     Kapal dan perlengkapan         229,589          370,511          (148,280)                    -                 -             451,820        Vessels and equipment

     Jumlah                      24,865,615        3,999,076           (742,046)            (72,834)             9,689          28,059,500                            Total

     Jumlah tercatat             30,574,504                                                                                     29,368,236             Net carrying value


     Pada tanggal 30 Juni 2025, aset hak guna                                            As at June 30, 2025, the right-of-use assets of the
     Pembangkit Listrik Tenaga Uap (“PLTU”) Tanjung                                      Tanjung Jati B Steam Power Plant (“PLTU”) 4x660
     Jati B 4x660 MW, yang berada di bawah perjanjian                                    MW, which are under a Financial Lease Agreement
     sewa pembiayaan (Catatan 26), dikategorikan                                         (Note 26), are categorised under installations and
     sebagai instalasi dan mesin pembangkit. Aset                                        power plants. The assets were insured with PT
     tersebut diasuransikan kepada PT Asuransi Mitsui                                    Asuransi Mitsui Sumitomo Indonesia against fire and
     Sumitomo Indonesia terhadap risiko kebakaran dan                                    other possible risks with insurance coverage of
     risiko lainnya dengan jumlah pertanggungan                                          JPY46,749,172,400 (full amount) or equivalent to
     masing-masing sebesar JPY46.749.172.400 (nilai                                      Rp5,264,492 (December 2024: JPY46,665,286,594
     penuh) atau setara dengan Rp5.264.492                                               (full amount) or equivalent to Rp4,826,590) and
     (Desember 2024: JPY46.665.286.594 (nilai penuh)                                     USD3,862,900,000 (full amount) or equivalent to Rp
     atau     setara   dengan    Rp4.826.590)     dan                                    Rp62,698,730 (December 2024: USD3,862,900,000
     USD3.862.900.000 (nilai penuh) atau setara                                          (full amount) or equivalent to Rp62,412,875)
     dengan      Rp62.698.730    (Desember      2024:
     USD3.862.900.000 (nilai penuh) atau setara
     dengan Rp62.412.875)

     Beban penyusutan untuk                      aset        hak     guna               Depreciation expense for right-of-use assets was
     dialokasikan sebagai berikut:                                                      allocated to the following:

                                                                    2025                         2024
                                                               (Enam bulan/                 (Enam bulan/
                                                                Six months)                  Six months)

      Beban usaha                                                   1,743,237                          1,664,980                                Operating expenses
      Persediaan                                                       34,786                             69,571                                          Inventories
      Beban lain-lain                                                  75,553                                                                         Other expense
      Aset dalam pembangunan                                           15,021                            18,347                              Construction in progress

      Jumlah                                                        1,868,596                          1,752,898                                                      Total
Page 80
                     PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                  DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                        Lampiran 5/70 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                           NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                  FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                             JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                         (Expressed in millions of Rupiah, unless otherwise stated)

7.   ASET HAK GUNA (lanjutan)                                                   7.    RIGHT-OF-USE ASSETS (continued)

     Berdasarkan penelaahan manajemen, Grup                                           Based on management’s assessment, the Group is of
     berpendapat bahwa tidak terdapat indikasi                                        the opinion that there were no indications of
     penurunan nilai aset hak guna pada tanggal 30 Juni                               impairment of right-of-use assets as at June 30, 2025
     2025 dan 31 Desember 2024.                                                       and December 31, 2024.


8.   PROPERTI INVESTASI                                                         8.    INVESTMENT PROPERTIES
                                                                      30 Juni/June 30, 2025
                                                   Perubahan
                                   Saldo awal/     nilai wajar/                                                       Saldo akhir/
                                   Beginning       Change in             Pengurangan/          Reklasifikasi/           Ending
                                    balance         fair value            Deduction           Reclassifications         balance

     Pemilikan langsung                                                                                                                   Direct acquisitions
     Hak atas tanah dan bangunan       5,567,178                  -                     -                         -       5,567,178   Land rights and buildings

                                                            31 Desember/December 31, 2024
                                                   Perubahan
                                   Saldo awal/     nilai wajar/                                                       Saldo akhir/
                                   Beginning       Change in        Pengurangan/       Reklasifikasi/                   Ending
                                    balance         fair value       Deduction       Reclassifications                  balance

     Pemilikan langsung                                                                                                                   Direct acquisitions
     Hak atas tanah dan bangunan       5,939,235        (236,524)                       -              (135,533)          5,567,178   Land rights and buildings


     Properti investasi merupakan hak atas tanah dan                                  Investment properties represents land rights and
     bangunan yang dimiliki anggota Grup, yaitu PIP,                                  buildings owned by members of the Group comprising
     PNP dan PLN Batam yang terletak di Pademangan                                    of PIP, PNP and PLN Batam, located in Pademangan
     - Jakarta Utara, Paiton - Jawa Timur, Bekasi - Jawa                              North Jakarta, Paiton - East Java, Bekasi - West Java,
     Barat, Pluit - Jakarta Utara, Asahan - Sumatera                                  Pluit - North Jakarta, Asahan - North Sumatera and
     Utara dan Kramatwatu Serang dengan hak legal                                     Kramatwatu Serang with HGB for periods between
     berupa HGB berjangka waktu dari 7 sampai 40                                      seven to 40 years until 2032, which are leased to PT
     tahun, jatuh tempo pada 2032, yang disewakan                                     Pertamina (Persero) (“Pertamina”), PT Pertamina
     kepada PT Pertamina (Persero) (“Pertamina”),                                     Hulu Energi ONWJ, PT Nusantara Regas, PT
     PT Pertamina Hulu Energi ONWJ, PT Nusantara                                      Bajradaya Sentranusa, PT Karya Semesta Gemilang,
     Regas, PT Bajradaya Sentranusa, PT Karya                                         PT Shenhua Guohua Pembangkitan Jawa Bali and
     Semesta Gemilang, PT Shenhua Guohua                                              several land rights and buildings that are leased to
     Pembangkitan Jawa Bali dan beberapa hak atas                                     third parties.
     tanah dan bangunan yang disewakan ke pihak
     ketiga.

     Selama periode enam bulan yang berakhir tanggal                                  During six month periods ended June 30, 2025,
     30 Juni 2025, beberapa hak atas tanah dan                                        certain land rights amounting to RpNil have been
     bangunan sejumlah RpNihil telah direklasifikasi ke                               reclassified to fixed assets while certain land rights
     aset tetap sedangkan beberapa hak atas tanah dan                                 and buildings amounting to RpNil have been
     bangunan sejumlah RpNihil telah direklasifikasi dari                             reclassified from fixed assets to investment properties.
     aset tetap ke properti investasi.

     Penghasilan sewa yang diperoleh dari properti                                    Rental income earned from investment properties
     investasi untuk tahun yang berakhir pada tanggal 30                              for the years ended June 30, 2025 and 2024
     Juni 2025 dan 2024 adalah masing-masing sebesar                                  amounting to Rp82,854 and Rp40,136 respectively.
     Rp82.854 dan Rp40.136.

     Pada 30 Juni 2025 dan 31 Desember 2024, Grup                                     As at June 30, 2025 and December 31, 2024, the
     tidak memiliki kewajiban kontraktual untuk                                       Group does not have any contractual obligations for
     perbaikan dan perawatan di masa depan.                                           future repairs and maintenance.
Page 81
                           PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                        DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                         Lampiran 5/71 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                           NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                  FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                             JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                         (Expressed in millions of Rupiah, unless otherwise stated)

9.    INVESTASI PADA ENTITAS ASOSIASI DAN                                     9.      INVESTMENTS IN ASSOCIATES AND JOINT
      VENTURA BERSAMA                                                                 VENTURES

      Rincian investasi pada entitas asosiasi dan ventura                             The details of investments in associates and joint
      bersama adalah sebagai berikut:                                                 ventures are as follows:
                                                                                                                      Persentase penyertaan/
                                                                                                     Tahun           Percentage of ownership
                                                                                                    operasi       30 Juni/              31 Desember/
                                                                                                   komersial/     June, 30              December 31,
           Entitas anak/                  Domisili/               Jenis usaha/                    Commercial        2025                     2024
           Subsidiaries                   Domicile             Nature of business                 operations         Rp                       Rp
     Entitas asosiasi/
     Associates
        PT Geo Dipa Energi
              ("GDE")                 Jakarta            Pembangkit tenaga listrik/                  2002          5.50%                  5.50%
                                                         Electricity supplier
        PT Mitra Energi Ba-
           tam("MEB")                 Batam              Pembangkit tenaga listrik/                  2004         30.00%                  30.00%
                                                         Electricity supplier
      PT Sumber Segara Pri-
         madaya ("S2P")               Cilacap            Pembangkit tenaga listrik/                  2006         49.00%                  49.00%
                                                         Electricity supplier
      PT Dalle Energy Batam
             ("DEB")                  Batam              Pembangkit tenaga listrik/                  2013         20.00%                  20.00%
                                                         Electricity supplier
     PT Energi Pelabuhan Indonesia
                ("EPEI")              Jakarta            Pembangkit tenaga listrik/                  2013         45.00%                  45.00%
                                                         Electricity supplier
     PT Tanjung Kasam Power
             ("TJK")                  Batam              Pembangkit tenaga listrik/                  2012         10.00%                  10.00%
                                                         Electricity supplier
      PT Indo Pusaka Berau
             ("IPB")                  Berau              Pembangkit tenaga listrik/                  2005         46.53%                  46.53%
                                                         Electricity supplier
        PT Adhiguna Putera
             ("AGP")                  Jakarta            Pelayaran/                                  1987         25.00%                  25.00%
                                                         Shipping
        PT Musi Mitra Jaya
            ("MMJ")                   Palembang          Transportasi batubara/                      2011         25.50%                  25.50%
                                                         Coal transportation
     PT Sriwijaya Bara Logistic
              ("SBL")                 Musi Banyuasin     Transportasi batubara/                      2014         25.50%                  25.50%
                                                         Coal transportation
     PT Rekind Daya Mamuju
            ("RDM")                   Jakarta            Pembangkit tenaga listrik/                  2018         10.00%                  10.00%
                                                         Electricity supplier
       PT Sumbagselenergy Sakti
          Pewali ("SS Pewali")        Sumatera Selatan   Pembangkit tenaga listrik/                 2025           10.00%                 10.00%
                                                         Electricity supplier
     PT Energi Prima Elektrika
             ("EPE")                  Sumatera Selatan    Pembangkit tenaga listrik/                2006           7.50%                  7.50%
                                                         Electricity supplier
       PT Aruna Hijau Power                              Penunjang penyedia tenaga
             ("AHP")                  Batam              listrik/                                    2024         20.00%                  20.00%
                                                         Electrical supports
      PT Trina Mas Agra Indo-         Kendal             Manufaktur Solar Photovoltaic/               *)          25.00%                  25.00%
          nesia ("TMAI")
                                                         Solar Photovoltaic Manufacturer
     Ventura bersama/
     Joint ventures
     PT Unelec Indonesia ("Un-                           Penunjang penyedia tenaga
               indo")                 Jakarta            listrik/                                    1988         32.35%                  32.35%
                                                         Electrical supports
     PT Bajradaya Sentranusa
             ("BDSN")                 Asahan             Pembangkit tenaga listrik/                  2011         36.61%                  36.61%
                                                         Electricity supplier
     PT Bukit Pembangkit Innovative
                ("BPI")               Palembang          Pembangkit tenaga listrik/                  2015         40.25%                  40.25%
                                                         Electricity supplier
     PT Komipo Pembangkitan Jawa
          Bali ("Komipo PJB")         Jepara             Operasi dan pemeliharaan/                   2010         49.00%                  49.00%
                                                         Operational and maintenance
       PT Indo Raya Tenaga
              ("IRT")                 Jakarta            Pembangkit tenaga listrik/                  2025         51.00%                  51.00%
                                                         Electricity supplier
     PT Rajamandala Electric Power
               ("REP")                Jakarta            Pembangkit tenaga listrik/                  2019         51.00%                  51.00%
                                                         Electricity supplier
        PT Perta Daya Gas                                Transportasi dan penyimpanan
             ("PDG")                  Jakarta            LNG/                                        2015         35.00%                  35.00%
                                                         Transportation and storage of
                                                         LNG
     PT Crompton Prima Switchgear                        Peralatan pengontrol dan pendist-
          Indonesia ("CPSI")          Jakarta            busian listrik/                             2014         49.00%                  49.00%
                                                         Electricity controller and distribu-
                                                         tion
       PT Pura Daya Prima                                Pembangkit tenaga listrik/
            ("PDP")                   Sumatera Selatan   Electricity supplier                       2006          15.00%                  15.00%



      *) Dalam tahap pengembangan                                                  *) In development stage
      **) Terdapat perwakilan PLN                                                  **) PLN has a representative
Page 82
                       PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                    DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                            Lampiran 5/72 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                              NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                     FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                                JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                            (Expressed in millions of Rupiah, unless otherwise stated)

9.   INVESTASI PADA ENTITAS ASOSIASI DAN                                         9.     INVESTMENTS IN ASSOCIATES AND JOINT
     VENTURA BERSAMA (lanjutan)                                                         VENTURES (continued)

     Rincian investasi pada entitas asosiasi dan ventura                                The details of investments in associates and joint
     bersama adalah sebagai berikut: (lanjutan)                                         ventures are as follows: (continued)
                                                                                                                                Persentase penyertaan/
                                                                                                                 Tahun         Percentage of ownership
                                                                                                                 operasi    30 Juni/           31 Desember/
                                                                                                               komersial/   June, 30           December 31,
             Entitas anak/                      Domisili/                   Jenis usaha/                      Commercial      2025                 2024
              Subsidiaries                       Domicile               Nature of business                    operations       Rp                   Rp
     Ventura bersama/Joint ven-
     tures
     PT Shenhua Guohua                          Jakarta       Pembangkit tenaga listrik/                             2019       30.00%                   30.00%
       Pembangkitan Jawa Bali
     ("SGPJB")                                                Electricity supplier
     PT GCL Indotenaga ("GCL")                  Jakarta       Pembangkit tenaga listrik/                             2021       35.00%                   35.00%
                                                              Electricity supplier
     PT Guohua Taidian                          Jakarta       Pembangkit tenaga listrik/                             2019       30.00%                   30.00%
       Pembangkitan Jawa Bali
     ("GTPJB")                                                Electricity supplier
                                                Sumatera
     PT North Sumatra Hydro Energy              Utara         Pembangkit tenaga listrik/                              *)        25.00%                   25.00%
       Pembangkitan Jawa Bali
     ("NSHE")                                                 Electricity supplier
     PT Pembangkitan Jawa Bali                  Jakarta       Pembangkit tenaga listrik/                             2023       51.00%                   51.00%
        Masdar Solar Energi ("PMSE")                          Electricity supplier
     PT Maxpower Cogindo Batam                  Batam         Pembangkit tenaga listrik, kelistrikan,                2022       30.00%                   30.00%
     ("MCB")                                                  perdagangan besar mesin kantor dan
                                                              industri, suku cadang dan perlengka-
                                                              pannya/
                                                              Power generation,
                                                              supporting activities electricity,
                                                              wholeseller of office machinery and
                                                              industry, spare parts and pittings
     PT Industri Baterai Indonesia              Jakarta       Industri EV Battery dan ESS/                            *)         7.49%                   19.90%
     ("IBI")                                                  EV Battery and ESS Industry
     PT Nusantara Sembcorp Solar Energy         Jakarta       Pembangkit tenaga listrik/                              *)        51.00%                   51.00%
     ("NSSE")
                                                              Electricity supplier
     PT Nusantara Tembesi Bayu Energi                         Pembangkit tenaga listrik/                              *)
     ("NTBE")                                   Batam                                                                           51.00%                   51.00%
                                                              Electricity supplier
     PT Nusantara Guodian Karangkates Indone-                 Pembangkit tenaga listrik/                              *)
     sia ("NGKI")                               Jakarta                                                                         51.00%                   51.00%
                                                              Electricity supplier
     PT Minahasa Brantas Energi                 Sulawesi
     ("MBE")                                    Utara         Pembangkit tenaga listrik/                             2024       51.00%                   51.00%
                                                              Electricity supplier
     PT Indo Acwa Tenaga Saguling                             Pembangkit tenaga listrik/                              *)
     ("IATS")                                   Jakarta                                                                         51.00%                   51.00%
                                                              Electricity supplier
     PT Indo Acwa Tenaga Singkarak                            Pembangkit tenaga listrik/                              *)
     ("IATSin")                                 Jakarta                                                                         51.00%                   51.00%
                                                              Electricity supplier




     *) Dalam tahap pengembangan                                                      *) In development stage
     **) Terdapat perwakilan PLN                                                      **) PLN has a representative
Page 83
                         PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                      DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                             Lampiran 5/73 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                             NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                    FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                               JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                           (Expressed in millions of Rupiah, unless otherwise stated)

9.   INVESTASI PADA ENTITAS ASOSIASI DAN                                       9.        INVESTMENTS IN ASSOCIATES AND JOINT
     VENTURA BERSAMA (lanjutan)                                                          VENTURES (continued)

     Seluruh entitas asosiasi dan ventura bersama                                       All the associates and joint ventures are recorded by
     dicatat oleh Grup dengan menggunakan metode                                        the Group using the equity method. They are private
     ekuitas. Seluruh entitas adalah entitas tertutup dan                               entities and there is no quoted market price available
     tidak terdapat harga pasar yang dikutip yang                                       for their shares.
     tersedia untuk sahamnya.

     Pada tanggal 30 Juni 2025 dan 31 Desember 2024,                                    As at June 30, 2025 and December 31, 2024,
     manajemen berpendapat bahwa tidak terdapat                                         management believes that there is no restriction and
     pembatasan dan risiko signifikan yang terkait                                      significant risk regarding the investments in associates
     dengan investasi pada asosiasi dan ventura                                         and joint ventures.
     bersama.

     Mutasi investasi pada entitas asosiasi dan ventura                                 Changes in investments in associates and joint
     bersama adalah sebagai berikut:                                                    ventures are as follows:


                                                                   30 Juni/June 30, 2025
                                                                                             Bagian atas
                            Jumlah                                                           pendapatan                            Jumlah
                            tercatat                                Bagian atas             komprehensif                           tercatat
                        1 Januari 2025/                              laba (rugi)               lainnya/                         30 Juni 2025/
                           Carrying                                    bersih/              Share of other                        Carrying
                            amount             Penambahan/            Share of             comprehensive        Dividen/           amount
                        January 1, 2025         Additions           profit (loss)              income           Dividend        June 30, 2025
                               Rp                  Rp                    Rp                       Rp               Rp                 Rp

     Entitas asosiasi                                                                                     --                                         Associates
     S2P                           8,527,062                -                 517,439                     -         (248,540)         8,795,961             S2P
     SBL                             362,653                -                  13,167                     -                -            375,820             SBL
     MMJ                             255,621                -                   1,424                     -                -            257,045            MMJ
     MEB                             152,512                -                   1,516                     -                -            154,028            MEB
     TJK                             160,672                -                   6,520                     -                -            167,192             TJK
     GDE                             128,219                -                       -                     -                -            128,219            GDE
     TMAI                            106,314                -                 (10,074)                    -                -             96,240            TMAI
     IPB                              74,086                -                  (9,942)                    -                -             64,144             IPB
     DEB                              84,829                -                     550                     -                -             85,379            DEB
     SS PEWALI                        66,411               (695)                    -                   489                -             66,205      SS PEWALI
     EPI                              62,128                -                   2,232                     -           (1,866)            62,494             EPI
     AGP                              51,626             (5,830)                9,717                     -                -             55,513            AGP
     RDM                              39,083                -                  (8,442)                    -                -             30,641            RDM
     AHP                               2,500                -                     -                     -                -                2,500            AHP
                                  10,073,716             (6,525)              524,107                   489         (250,406)        10,341,381

     Ventura bersama                                                                                                                              Joint ventures
     IRT                           7,657,689                  -               856,079               (329,306)              -          8,184,462               IRT
     SGPJB                         5,294,628            (39,885)              369,657                (47,461)              -          5,576,939           SGPJB
     NSHE                          2,270,420            111,631               162,042                 (9,496)              -          2,534,597            NSHE
     BPI                           1,841,820              2,135                17,078                 51,370               -          1,912,403               BPI
     BDSN                          1,199,998                  -               (40,738)                70,793        (142,421)         1,087,632            BDSN
     GCL                             948,574                  -                70,010                (81,510)              -            937,074              GCL
     PMSE                            224,522             17,855                 11,749                (1,993)              -            252,133            PMSE
     NGKI                            151,643              3,976               (533.00)                     6               -            155,092             NGKI
     NSSE                            102,514              6,192                 9,264                 (6,303)              -            111,667            NSSE
     REP                             142,472                  -                12,493                    106               -            155,071              REP
     IBI                              81,681                  -                      -                     -               -             81,681                IBI
     Komipo PJB                       77,426                  -                24,571                      -          (6,822)            95,175      Komipo PJB
     PDG                              97,253                  -                11,336                      -               -            108,589             PDG
     NTBE                             43,054                  -                  (636)                     -               -             42,418            NTBE
     PDP                              14,618                  -                      -                     -            (375)            14,243              PDP
     MCB                              11,924                  -                   807                      -               -             12,731             MCB
     IATS                              4,824                  -                 5,045                    163               -             10,032             IATS
     GTPJB                             3,072                174                   148                     (9)              -              3,385           GTPJB
     Unindo                                -                  -                      -                     -               -                  -           Unindo
     MBE                              32,286                                     (746)                  (568)              -             30,972             MBE
     IATSing                          10,710                                        8                    441               -             11,159          IATSing
                                  20,211,128            102,078             1,507,634               (353,767)       (149,618)        21,317,455

                                  30,284,844             95,553             2,031,741               (353,278)       (400,024)        31,658,836
Page 84
                        PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                     DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                      Lampiran 5/74 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                      NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                             FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                        JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                    (Expressed in millions of Rupiah, unless otherwise stated)

9.   INVESTASI PADA ENTITAS ASOSIASI DAN                                9.      INVESTMENTS IN ASSOCIATES AND JOINT
     VENTURA BERSAMA (lanjutan)                                                 VENTURES (continued)

     Mutasi investasi pada entitas asosiasi dan ventura                        Changes in investments in associates and joint
     bersama adalah sebagai berikut: (lanjutan)                                ventures are as follows: (continued)

                                                            31 Desember/December 31, 2024
                                   Jumlah                      Bagian atas    Bagian atas                       Jumlah
                                   tercatat                     laba/(rugi)   penghasilan/                      tercatat
                                  1 Januari                       bersih       (kerugian)                    31 Desember
                                    2024/                         entitas/   komprehensif                        2024/
                                  Carrying                         Share        lainnya/                       Carrying
                                   amount                          in net    Share of other                     amount
                                 January 1,      Penambahan/     income/    comprehensive      Dividen/      December 31,
                                     2024         Additions        (loss)    income/(loss)    Dividends           2024

     Entitas asosiasi                                                                                                            Associates
     S2P                             7,590,934              -    1,318,035              -        (381,907)        8,527,062            S2P
     SBL                               352,656              -        9,997              -               -           362,653            SBL
     MMJ                               263,342              -       (7,721)             -               -           255,621           MMJ
     TJK                               148,212              -        5,468          6,992               -           160,672            TJK
     MEB                               138,161              -       14,503           (152)              -           152,512           MEB
     GDE                               114,458              -       14,963              -          (1,202)          128,219           GDE
     TMAI                               30,468         96,627      (20,781)             -               -           106,314           TMAI
     DEB                                95,844              -      (11,015)             -               -            84,829            DEB
     IPB                               126,174              -      (52,088)             -               -            74,086             IPB
     SS Pewali                          68,001              -       (1,590)             -               -            66,411       SS Pewali
     EPEI                               57,849              -        5,424              -          (1,145)           62,128           EPEI
     AGP                                41,292              -       18,282            (29)         (7,919)           51,626           AGP
     RDM                                46,588              -      (10,387)         2,882               -            39,083           RDM
     AHP                                     -          2,500            -              -               -             2,500            AHP
     EPE                                     -              -            -              -               -                 -            EPE

     Subjumlah                       9,073,979         99,127    1,283,090          9,693       (392,173)        10,073,716         Subtotal

     Ventura bersama                                                                                                          Joint ventures
     IRT                             6,444,894              -      931,190        281,605               -         7,657,689               IRT
     SGPJB                           4,593,871              -      643,883        228,024        (171,150)        5,294,628           SGPJB
     NSHE                            1,984,981              -      184,557        100,882               -         2,270,420            NSHE
     BPI                             1,803,802              -       42,957         84,168         (89,107)        1,841,820               BPI
     BDSN                            1,146,697              -      121,898         56,568        (125,165)        1,199,998            BDSN
     GCL                               854,342              -      146,886        107,347        (160,001)          948,574              GCL
     PMSE                              177,557          2,072       45,908         (1,015)              -           224,522            PMSE
     NGKI                                    -        151,643            -              -               -           151,643             NGKI
     REP                               146,743              -      (10,578)         6,307               -           142,472              REP
     NSSE                                    -        102,470           44              -               -           102,514            NSSE
     PDG                                79,208              -       18,045              -               -            97,253             PDG
     IBI                               112,951              -      (31,270)             -               -            81,681                IBI
     Komipo PJB                         78,732              -        5,516              -          (6,822)           77,426     Komipo PJB
     NTBE                                    -         43,372         (318)             -               -            43,054            NTBE
     MBE                                     -         32,283            3              -               -            32,286             MBE
     PDP                                13,673              -        1,253              -            (308)           14,618              PDP
     MCB                                12,290              -         (366)             -               -            11,924             MCB
     IATSing                                 -         10,710            -              -               -            10,710          IATSing
     IATS                                    -         10,710       (6,236)           350               -             4,824             IATS
     GTPJB                               3,061              -          359            (40)           (308)            3,072           GTPJB
     CPSI                                    -              -            -              -               -                 -             CPSI
     Unindo                                  -              -            -              -               -                 -           Unindo

     Subjumlah                     17,452,802         353,260    2,093,731        864,196        (552,861)       20,211,128         Subtotal

     Jumlah                        26,526,781         452,387    3,376,821        873,889        (945,034)       30,284,844             Total
Page 85
                       PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                    DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                       Lampiran 5/75 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                   NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                          FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                     JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                 (Expressed in millions of Rupiah, unless otherwise stated)

9.   INVESTASI PADA ENTITAS ASOSIASI DAN                                9.    INVESTMENTS IN ASSOCIATES AND JOINT
     VENTURA BERSAMA (lanjutan)                                               VENTURES (continued)

     Berikut ini adalah ringkasan informasi keuangan                          The following table contains the summarised financial
     entitas asosiasi dan ventura bersama pada                                information for associates and joint ventures as at
     30 Juni 2025 dan 31 Desember 2024 yang dicatat                           June 30, 2025 and December 31, 2024 which are
     dengan menggunakan metode ekuitas.                                       accounted for using the equity method.

     Entitas asosiasi                                                         Associates

                                                              30 Juni/June 30, 2025
                                                                                  Lain-lain/
                                           S2P          MMJ            SBL                          Jumlah
                                                                                   Others

     Lancar
     Kas dan setara kas                  1,048,109         3,995         3,970       2,401,785      3,457,859        Cash and cash equivalents
     Aset lancar lainnya                                                                                                  Other current assets
        (tidak termasuk kas)            15,387,952      359,176        367,875       1,442,909     17,557,912              (excluding cash)

     Jumlah aset lancar                 16,436,061      363,171        371,845       3,844,694     21,015,771                Total current assets

     Liabilitas keuangan                                                                                                      Financial liabilities
         Utang usaha                     1,859,773      362,476        145,534         432,162      2,799,945                Trade payables
         Liabilitas lancar lainnya       2,593,135      534,398        247,576       1,018,753      4,393,862         Other current liabilities

     Jumlah liabilitas lancar            4,452,908      896,874        393,110       1,450,915      7,193,807              Total current liabilities

     Tidak lancar
     Aset                               19,441,862     1,270,996       703,811       8,861,987     30,278,656         Total non-current liabilities

     Liabilitas                                                                                                                         Liabilities
     Liabilitas keuangan                 9,719,223            -              -       3,491,807     13,211,030                  Financial liabilities
     Liabilitas lainnya                  6,590,039      529,647        153,391         742,509      8,015,586                     Other liabilities

     Jumlah liabilitas tidak lancar     16,309,262      529,647        153,391       4,234,316     21,226,616         Total non-current liabilities

     Aset bersih                        15,115,753      207,646        529,155       7,021,450     22,874,004                          Net assets

     % kepemilikan efektif               49.00%        25.60%        25.60%       6.67% - 46.53%                                  % of ownership

     Bagian Grup atas aset bersih                                                                                  The Group’s share of the net
        asosiasi                         7,406,719       53,157        135,464         907,362      8,502,702           assets of associates
     Penyesuaian metode ekuitas          1,389,242      203,888        240,356           5,193      1,838,679     Adjustments of equity methods

     Jumlah tercatat                     8,795,961      257,045        375,820         912,555     10,341,381               Total carrying value


     Pendapatan                          17,076,665      243,577       196,577        1,085,138     18,601,957                         Revenue
     Beban pokok penjualan              (14,413,075)    (234,548)     (123,207)      (1,099,868)   (15,870,698)                 Cost of revenue
     Depresiasi dan amortisasi              (26,951)           -             -          (17,020)       (43,971)   Depreciation and amortisation
     Pendapatan keuangan                          -            -             -               61             61                  Finance income
     Beban keuangan                        (815,485)           -             -                -       (815,485)                   Finance costs
     Beban operasi                             (858)      (2,972)       (3,053)        (251,655)      (258,538)            Operating expenses
     Pendapatan (beban) lain-lain,                -            -             -                -              -        Other income/(expenses)
        bersih                                2,995        1,073        (4,376)        (157,007)      (157,315)                          net
     Beban pajak penghasilan               (767,294)      (1,569)      (14,506)         (70,565)      (853,934)             Income tax expense

     Laba/(rugi) periode berjalan        1,055,997         5,561        51,435        (510,916)       602,077        Profit/(loss) for the periode

     % kepemilikan efektif               49.00%        25.60%        25.60%       6.67% - 46.53%                                  % of ownership

                                                                                                                        The Group’s share in net
     Bagian Grup atas laba/(rugi)                                                                                               income/(loss) for
        asosiasi periode berjalan          517,439         1,424        13,167           (7,923)      524,107         the year of associates


     Laba/(rugi) komprehensif lainnya             -             -             -                -             -                The Group’s share
     Bagian Grup atas laba/(rugi)                                                                                    of other comprehensive
        komprehensif asosiasi                     -             -             -            489            489           income of associates

     Dividen yang diterima dari                                                                                               Dividends received
         perusahaan asosiasi              (248,540)             -             -          (1,866)     (250,406)               from associates
Page 86
                         PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                      DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                            Lampiran 5/76 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                      NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                             FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                        JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                    (Expressed in millions of Rupiah, unless otherwise stated)

9.   INVESTASI PADA ENTITAS ASOSIASI DAN                                   9.      INVESTMENTS IN ASSOCIATES AND JOINT
     VENTURA BERSAMA (lanjutan)                                                    VENTURES (continued)

     Entitas asosiasi (lanjutan)                                                   Associates (continued)

     Berikut ini adalah ringkasan informasi keuangan                               The following table contains the summarised financial
     entitas asosiasi dan ventura bersama pada                                     information for associates and joint ventures as at
     30 Juni 2025 dan 31 Desember 2024 yang dicatat                                June 30, 2025 and December 31, 2024 which are
     dengan menggunakan metode ekuitas. (lanjutan)                                 accounted for using the equity method. (continued)
                                                              31 Desember/December 31, 2024
                                                                                           Lainnya/               Jumlah/
                                              S2P           MMJ            SBL              Others                 Total


     Aset lancar                                                                                                                              Current assets
      Kas dan setara kas                         909,817        6,071              5,641             1,522,729      2,444,258    Cash and cash equivalents
      Aset lancar lainnya                                                                                                              Other current assets
          (tidak termasuk kas)                 4,866,075      309,024           362,807              2,060,755      7,598,661          (excluding cash)

     Jumlah aset lancar                        5,775,892      315,095           368,448              3,583,484     10,042,919              Total current assets

     Aset tidak lancar                        29,278,617     1,213,742          677,236             17,761,487     48,931,082               Non-current assets

     Liabilitas lancar                                                                                                                       Current liabilities
       Liabilitas keuangan                                                                                                                Financial liabilities
          (tidak termasuk utang usaha)         3,955,782            -                 -              1,402,303      5,358,085 (excluding trade payables)
       Liabilitas lancar lainnya               1,340,102      779,955           352,045                639,266      3,111,368        Other current liabilities

     Jumlah liabilitas lancar                  5,295,884      779,955           352,045              2,041,569      8,469,453            Total current liabilities

     Liabilitas tidak lancar                                                                                                             Non-current liabilities
       Liabilitas keuangan                     8,043,582            -                 -              6,326,506     14,370,088             Financial liabilities
       Liabilitas tidak lancar lainnya         4,312,433      507,246           154,570              3,756,779      8,731,028     Other non-current liabilities

     Jumlah liabilitas tidak lancar           12,356,015      507,246           154,570             10,083,285     23,101,116       Total non-current liabilities

     Aset bersih                              17,402,610      241,636           539,069              9,220,117     27,403,432                        Net assets

     % kepemilikan                               49.00%        25.60%            25.60%         5.50% - 46.53%                                  % of ownership

     Bagian Grup atas aset bersih                                                                                               The Group’s share of the net
      asosiasi                                 8,527,279       61,859           138,002              1,088,638      9,815,778         assets of associates
     Penyesuaian metode ekuitas                     (217)           -                 -               (160,258)      (160,475) Adjustment of equity methods
     Kenaikan nilai wajar                                     228,950           265,290                               494,240                 Fair value uplift
     Amortisasi kenaikan nilai wajar                   -      (35,188)          (40,639)                     -        (75,827) Amortisation of fair value uplift

     Jumlah tercatat                           8,527,062      255,621           362,653               928,380      10,073,716            Total carrying value

     Pendapatan                               12,798,252      410,494            337,977             3,191,305     16,738,028                       Revenue
     Beban pokok pendapatan                   (6,026,295)    (346,323)          (199,896)           (1,876,339)    (8,448,853)               Cost of revenue
     Depresiasi dan amortisasi                  (181,524)           -                  -              (119,991)      (301,515) Depreciation and amortisation
     Pendapatan keuangan                           9,515            -                       -            1,024         10,539                Finance income
     Beban keuangan                             (955,081)           -                  -               (85,398)    (1,040,479)                 Finance costs
     Beban operasi                            (2,202,560)      (5,756)            (6,190)             (778,258)    (2,992,764)          Operating expenses
     Pendapatan/(beban) lain-lain,
      bersih                                      13,218       (75,988)          (63,730)              (49,505)      (176,005) Other income/(expenses) - net
     Beban pajak penghasilan                    (765,658)      (12,585)          (29,111)             (192,436)      (999,790)           Income tax expense

     Laba/(rugi) tahun berjalan                2,689,867       (30,158)          39,050                90,402       2,789,161          Profit/(loss) for the year

     % kepemilikan                               49.00%        25.60%            25.60%         5.50% - 46.53%                                  % of ownership

                                                                                                                                        The Group’s share in
     Bagian Grup atas laba                                                                                                          net income for the year
      bersih asosiasi tahun berjalan           1,318,035        (7,721)            9,997               (37,221)     1,283,090                of associates

     Penghasilan komprehensif lainnya                  -             -                 -               98,121          98,121    Other comprehensive income

     Bagian Grup atas penghasilan                                                                                                         The Group’s share
      komprehensif lainnya                                                                                                         of other comprehensive
      asosiasi                                         -             -                 -                 9,693          9,693         income of associates

     Dividen yang diterima dari                                                                                                          Dividends received
     perusahaan asosiasi                 (381,907)                   -                 -              (10,266)       (392,173)        from associates
Page 87
                        PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                     DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                 Lampiran 5/77 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                              NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                     FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                                JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                            (Expressed in millions of Rupiah, unless otherwise stated)

9.   INVESTASI PADA ENTITAS ASOSIASI DAN                                           9.     INVESTMENTS IN ASSOCIATES AND JOINT
     VENTURA BERSAMA (lanjutan)                                                           VENTURES (continued)

     Ventura bersama (lanjutan)                                                           Joint ventures (continued)

     Berikut ini adalah ringkasan informasi keuangan                                      The following table contains the summarised financial
     entitas asosiasi dan ventura bersama pada                                            information for associates and joint ventures as at
     30 Juni 2025 dan 31 Desember 2024 yang dicatat                                       June 30, 2025 and December 31, 2024 which are
     dengan menggunakan metode ekuitas. (lanjutan)                                        accounted for using the equity method. (continued)

                                                                          30 Juni/June 30, 2025
                                                                                                             Lain-lain/
                                         BDSN          BPI          IRT           SGPJB           NSHE                       Jumlah
                                                                                                              Others

     Lancar
     Kas dan setara kas                  371,928      731,345       323,444       4,370,584        88,733     1,416,987      7,303,021       Cash and cash equivalents
     Aset lancar lainnya                                                                                                                           Other current assets
        (tidak termasuk kas)             797,904      343,273      2,235,906      7,083,675          583      1,465,552     11,926,893             (excluding cash)
     Jumlah aset lancar                 1,169,832    1,074,618     2,559,350    11,454,259         89,316     2,882,539     19,229,914               Total current assets
     Liabilitas keuangan                                                                                                                             Financial liabilities
         Utang usaha                      92,249      173,646          4,227      1,668,446     1,816,196       233,510      3,988,274               Trade payables
         Liabilitas lancar lainnya       154,667       59,913      5,541,704      1,668,375       221,319     1,121,554      8,767,532        Other current liabilities

     Jumlah liabilitas lancar            246,916      233,559      5,545,931      3,336,821     2,037,515     1,355,064     12,755,806            Total current liabilities

     Tidak lancar
     Aset                               5,289,884    4,050,859    57,196,925    20,736,480     18,407,034    10,956,281    116,637,463        Total non-current liabilities

     Liabilitas                                                                                                       -                                        Liabilities
     Liabilitas keuangan                2,043,671           -              -      9,556,051     7,567,536     2,986,737     22,153,995                Financial liabilities
     Liabilitas lainnya                 1,191,661     541,611     38,162,381      1,445,707       881,533     4,854,921     47,077,814                   Other liabilities

     Jumlah liabilitas tidak lancar     3,235,332     541,611     38,162,381    11,001,758      8,449,069     7,841,658     69,231,809        Total non-current liabilities

     Aset bersih                        2,977,468    4,350,307    16,047,963    17,852,160      8,009,766     4,642,098     53,879,762                         Net assets

     % kepemilikan efektif                37%          40%          51%            30%            25%                                                     % of ownership

     Bagian Grup atas aset bersih                                                                                                           The Group’s share of the net
        asosiasi                        1,090,051    1,750,999     8,184,461      5,355,648     2,002,442     1,797,862     20,181,463           assets of associates
     Penyesuaian metode ekuitas            (2,419)     161,404             -        221,291       532,155       223,560      1,135,992    Adjustments of equity methods

     Jumlah tercatat                    1,087,632    1,912,403     8,184,461      5,576,939     2,534,597     2,021,423     21,317,455             Total carrying value


     Pendapatan                           368,129     225,329      2,751,450      3,626,738   4,240,386         882,890     12,094,922                         Revenue
     Beban pokok penjualan               (344,283)   (323,802)             -     (3,504,454) (3,075,867)       (631,167)    (7,879,573)                 Cost of revenue
     Depresiasi dan amortisasi               (491)    (18,554)        (1,926)             -           -          (1,817)       (22,788)   Depreciation and amortisation
     Pendapatan keuangan                    2,581     252,352            201      1,628,947           -         485,515      2,369,596                  Finance income
     Beban keuangan                       (78,907)          -       (880,117)             -    (302,774)       (228,571)    (1,490,369)                   Finance costs
     Beban operasi                              -     (36,116)       (75,666)      (562,581)    (32,982)       (156,578)      (863,923)            Operating expenses
     Pendapatan (beban) lain-lain,              -           -              -              -           -               -              -        Other income/(expenses)
        bersih                                  -      10,813        277,283              -           -          24,650        312,746                            net
     Beban pajak penghasilan              (58,304)    (67,593)      (392,639)        43,541    (180,596)        (16,586)      (672,177)            Income tax expense

     Laba/(rugi) periode berjalan        (111,275)     42,429      1,678,586      1,232,191       648,167      358,336       3,848,434       Profit/(loss) for the periode

     % kepemilikan efektif                37%          40%          51%            30%            25%        30%-51%                                      % of ownership

                                                                                                                                                The Group’s share in net
     Bagian Grup atas laba/(rugi)                                                                                                                      income/(loss) for
        asosiasi periode berjalan         (40,738)     17,078       856,079        369,657        162,042      143,516       1,507,634         the year of associates


     Laba/(rugi) komprehensif lainnya    193,371      127,627       (645,698)      (158,203)      (37,984)     (249,396)      (770,283)              The Group’s share
     Bagian Grup atas laba/(rugi)                                                                                                            of other comprehensive
        komprehensif asosiasi             70,793       51,370       (329,306)       (47,461)       (9,496)      (89,667)      (353,767)         income of associates

     Dividen yang diterima dari                                                                                                                       Dividends received
         perusahaan asosiasi             (142,421)                          -                            -       (7,197)      (149,618)               from associates
Page 88
                            PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                         DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                 Lampiran 5/78 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                              NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                     FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                                JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                            (Expressed in millions of Rupiah, unless otherwise stated)

9.   INVESTASI PADA ENTITAS ASOSIASI DAN                                           9.      INVESTMENTS IN ASSOCIATES AND JOINT
     VENTURA BERSAMA (lanjutan)                                                            VENTURES (continued)

     Ventura bersama (lanjutan)                                                            Joint ventures (continued)

     Berikut ini adalah ringkasan informasi keuangan                                       The following table contains the summarised financial
     entitas asosiasi dan ventura bersama pada                                             information for associates and joint ventures as at
     30 Juni 2025 dan 31 Desember 2024 yang dicatat                                        June 30, 2025 and December 31, 2024 which are
     dengan menggunakan metode ekuitas. (lanjutan)                                         accounted for using the equity method. (continued)
                                                                        31 Desember/December 31, 2024
                                                                                                                     Lainnya/       Jumlah/
                                           BDSN         BPI           IRT          SGPJB           NSHE               Others         Total
     Aset lancar                                                                                                                                                   Current assets
      Kas dan setara kas                    608,536      337,869      1,206,361     3,576,069            32,785        1,183,440      6,945,060       Cash and cash equivalents
      Aset lancar lainnya                                                                                                                                   Other current assets
           (tidak termasuk kas)             722,799      446,590        25,818      7,160,432              377         1,632,332      9,988,348              (excluding cash)

     Jumlah aset lancar                    1,331,335     784,459      1,232,179    10,736,501            33,162        2,815,772     16,933,408                 Total current assets

     Aset tidak lancar                     5,738,754    4,671,721    55,507,022    22,892,269      21,375,573         12,083,848    122,269,187                  Non-current assets

     Liabilitas lancar                                                                                                                                             Current liabilities
       Liabilitas keuangan                                                                                                                                     Financial liabilities
            (tidak termasuk utang usaha)    247,813       13,127       368,435      3,037,323       2,231,938          1,539,110      7,437,746      (excluding trade payables)
       Liabilitas lancar lainnya             94,643      244,129       266,549         80,765           3,259            639,492      1,328,837            Other current liabilities

     Jumlah liabilitas lancar               342,456      257,256       634,984      3,118,088       2,235,197          2,178,602      8,766,583               Total current liabilities

     Liabilitas                                                                                                                                              Non-current liabilities
     Liabilitas keuangan                   2,208,582           -     38,271,749    11,325,391       9,157,941          1,982,328     62,945,991               Financial liabilities
     Liabilitas lainnya                    1,241,266     618,582      2,817,391     1,536,558         978,847          5,870,773     13,063,417       Other non-current liabilities

     Jumlah liabilitas tidak lancar        3,449,848     618,582     41,089,140    12,861,949      10,136,788          7,853,101     76,009,408       Total of non-current liabilities

     Aset bersih                           3,277,785    4,580,342    15,015,077    17,648,733       9,036,750          4,867,917     54,426,604                           Net assets

     % kepemilikan                           36.61%       40.25%        51.00%          30.00%          25.00%    15.00% - 51.00%                                  % of ownership

     Bagian Grup atas aset bersih                                                                                                                   The Group’s share of the net
      ventura bersama                      1,199,997    1,843,588     7,657,689     5,294,620       2,259,188          1,916,884     20,171,966          assets of joint ventures
     Penyesuaian metode ekuitas                    1       (1,768)            -             8          11,232             29,689         39,162    Adjustments of equity methods

     Jumlah tercatat                       1,199,998    1,841,820     7,657,689     5,294,628       2,270,420          1,946,573     20,211,128             Total carrying value

     Pendapatan                              640,613      945,071     8,163,534    10,672,235       6,148,121          3,279,999     29,849,573                         Revenue
     Beban pokok pendapatan                  (19,236)    (682,498)   (3,490,907)   (7,023,600)     (4,679,349)        (1,979,006)   (17,874,596)                 Cost of revenue
     Depresiasi dan amortisasi                (1,004)     (31,459)            -             -               -             (8,890)       (41,353)   Depreciation and amortisation
     Pendapatan keuangan                       4,693            -           473       131,462               -             40,112        176,740                  Finance income
     Beban keuangan                         (161,960)           -    (2,117,346)   (1,317,138)       (472,308)          (493,286)    (4,562,038)                Interest expense
     Beban operasi                           (50,026)     (86,459)      (42,346)     (266,161)        (37,551)          (386,182)      (868,725)            Operating expenses
     Pendapatan/(beban) lain-lain,
      bersih                                  10,761       40,080       (66,971)        (87,395)       (2,516)           (14,584)      (120,625)    Other income/(expense) - net
     Beban pajak penghasilan                 (90,876)     (78,010)     (620,574)         36,874      (218,170)           (47,970)    (1,018,726)             Income tax expense

     Laba tahun berjalan                    332,965      106,725      1,825,863     2,146,277           738,227          390,193      5,540,250                  Profit for the year

     % kepemilikan                           36.61%       40.25%        51.00%          30.00%          25.00%    15.00% - 51.00%                                 % of ownership

                                                                                                                                                          The Group’s share of
     Bagian Grup atas laba bersih                                                                                                                              net income for
      ventura bersama tahun berjalan        121,898       42,957       931,190          643,883         184,557          169,246      2,093,731     the year of joint ventures


     Penghasilan komprehensif lainnya       154,516      209,113       552,167          760,079         403,528          317,635      2,397,038     Other comprehensive income

     Bagian atas penghasilan                                                                                                                                    Share of other
      komprehensif lainnya                                                                                                                            comprehensive income
      ventura bersama                        56,568       84,168       281,605          228,024         100,882          112,949       864,196             of joint ventures

     Dividen yang diterima dari                                                                                                                              Dividends received
       perusahaan ventura bersama           (125,165)     (89,107)            -      (171,150)                -         (167,439)      (552,861)           from joint ventures


     Investasi pada entitas di atas diperoleh terutama                                     The investments in the above entities are held
     untuk tujuan potensi pertumbuhan jangka panjang,                                      primarily for long-term growth potential, since these
     karena seluruh entitas tersebut bergerak dalam                                        entities are engaged in the same electricity industry as
     industri ketenagalistrikan yang sama dengan                                           the Group. Management believes that there is no
     industri Grup. Manajemen meyakini bahwa tidak                                         indication of impairment.
     ada indikasi penurunan nilai.
Page 89
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/79 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                               FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                          JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)      (Expressed in millions of Rupiah, unless otherwise stated)

10. PIUTANG PIHAK BERELASI                                     10. RECEIVABLES FROM RELATED PARTIES

                                                 30 Juni/           31 Desember/
                                                 June 30,           December 31,
                                                   2025                 2024

     REP                                            501,218                485,856                                    REP
     SGPJB                                          360,243                440,009                                  SGPJB
     GCL                                             22,769                123,836                                    GCL
     PMSE                                           144,064                139,520                                   PMSE
     IPB                                              2,553                      -                                     IPB
     Lain-lain                                      107,435                 86,895                                  Others

     Jumlah                                        1,138,282             1,276,116                                     Total

     Dikurangi : bagian lancar                         7,948               178,202                    Less : current portion
     Bagian tidak lancar                           1,130,334             1,097,914                     Non-current portion

    REP                                                           REP

    Pada tanggal 4 Juli 2014, PIP, entitas anak,                  On July 4, 2014, PIP, a subsidiary, provided a long-
    memberikan pinjaman jangka panjang sebesar                    term loan of USD9,399,962 to REP, an associate, for
    USD9.399.962 kepada REP, entitas asosiasi, untuk              the financing of the 46.6 MW project at Hydroelectric
    membiayai proyek 46,6 MW di Pembangkit Listrik                Power Plant (“HPP”) Citarum River at Cianjur, West
    Tenaga Air (“PLTA”) Sungai Citarum di Cianjur,                Java. This loan bears an interest rate of 10% per
    Jawa Barat. Pinjaman ini dikenakan bunga 10% per              annum with a 17.5 year term of repayment after a
    tahun dengan jangka waktu 17,5 tahun setelah                  grace period during construction. The Commercial
    grace period selama pembangunan. Tanggal                      Operation Date (“COD”) has been amended, most
    operasi komersial PLTA telah diamendemen,                     recently through the First Amendment of PPA dated
    terakhir kali melalui Amendemen Pertama atas                  August 10, 2017, to become 57 months after the
    PJBTL tertanggal 10 Agustus 2017, menjadi 57                  financial close date.
    bulan setelah tanggal pendanaan.

    Pada tanggal 12 Mei 2019, PLTA Rajamandala 1 x                On May 12, 2019, the HPP Rajamandala 1 x 47 MW
    47 MW telah beroperasi secara komersial                       was commercially operated based on COD certificate
    berdasarkan sertifikat tanggal operasi komersial No.          No. 188.BA/159/REP/2019. The principal shall be
    188.BA/159/REP/2019. Pokok pinjaman akan                      invoiced and due every six months starting on COD.
    ditagihkan dan terutang setiap enam bulan sejak
    tanggal operasi komersial.

    Pada tanggal 23 November 2016, PIP memberikan                 On November 23, 2016, PIP provided additional loans
    tambahan pinjaman sebesar USD5.724.490 kepada                 of USD5,724,490 to REP with similar terms and
    REP dengan persyaratan dan kondisi yang sama                  conditions to the previous loan.
    dengan pinjaman sebelumnya.

    Pada tanggal 30 Juni 2025, saldo pokok pinjaman               As at June 30, 2025, PIP’s principal amounts due from
    PIP kepada REP adalah sebesar USD15.124.452                   REP is USD15,124,452 or equivalent to Rp245,485
    atau setara dengan Rp245.485 (Desember 2024:                  (December 2024: USD15,124,452 or equivalent to
    USD15.124.452 atau setara dengan Rp244.367)                   Rp244,367) and interest receivables amounting to
    dan piutang bunga sebesar USD15.266.156 atau                  USD15,266,156 or equivalent to Rp247,785
    setara dengan Rp247.785 (Desember 2024:                       (December 2024: USD14,516,149 or equivalent to
    USD14.516.149 atau setara dengan Rp234.537).                  Rp234,537). Other receivables of Rp7,948
    Piutang lainnya sebesar Rp7.948 (Desember 2024:               (December 2024: Rp6,952) represent costs of
    Rp6.952) merupakan biaya relokasi pegawai dan                 employee relocation and operation and maintenance
    pendapatan jasa operasi dan pemeliharaan.                     services revenue.
Page 90
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/80 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                     NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                            FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                       JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)   (Expressed in millions of Rupiah, unless otherwise stated)

10. PIUTANG PIHAK BERELASI (lanjutan)                       10. RECEIVABLES        FROM      RELATED       PARTIES
                                                                (continued)

    REP (lanjutan)                                             REP (continued)

    Pada periode yang berakhir 30 Juni 2025,                   During the period ended June 30, 2025, interest
    penghasilan bunga masing-masing adalah sebesar             income amounted to USD750,007 or equivalent to
    USD750.007 atau setara dengan Rp12.331                     Rp12,331 (December 2024: USD1,516,589 or
    (Desember 2024: USD1.516.589 atau setara                   equivalent to Rp24,133) which is presented in the
    dengan Rp24.133) yang disajikan dalam laporan              consolidated statements of profit or loss.
    laba rugi konsolidasian.

    Pada periode yang berakhir 30 Juni 2025 dan 31             During the years ended June 30, 2025 and
    Desember 2024, tidak ada pembayaran kembali                December 31, 2024, there was no repayment of the
    pokok pinjaman dan bunga yang dibayarkan oleh              loan principal and interest paid by REP. PIP is not
    REP. PIP tidak berhak untuk meminta pembayaran             able to request repayment of loan principal provided
    kembali atas pokok pinjaman yang diberikan                 to REP before the Senior Facility Release Date,
    kepada REP sebelum Tanggal Pembebasan                      while interest paid by REP should fulfil several terms
    Fasilitas Senior, namun untuk pembayaran bunga             and conditions as stated in the shareholder
    yang dilakukan oleh REP harus memenuhi syarat              agreement as follows:
    dan kondisi yang tertuang dalam perjanjian
    pemegang saham sebagai berikut:
    - Uang yang ada pada kredit dari Rekening                  - The monies stand to the credit of the Distribution
      Distribusi; atau                                            Accounts; or
    Sumber - sumber lain yang dapat disetujui secara           Other sources as may be approved in writing by the
    tertulis oleh Agen Antar Kreditur.                         Intercreditor Agent.

    SGPJB                                                      SGPJB

    Pada tanggal 20 November 2018, PLN NR, entitas             On November 20, 2018, PLN NR, a PNP subsidiary,
    anak PNP, memberikan pinjaman jangka panjang               granted a long-term loan to SGPJB amounting to
    sebesar USD56.516.733 kepada SGPJB dengan                  USD56,516,733 with an interest rate of LIBOR 6
    suku bunga LIBOR 6 bulan + 4%. Pinjaman akan               months + 4%. The loan will mature on December 15,
    jatuh tempo pada tanggal 15 Desember 2033.                 2033. The interest will be due every January 15 and
    Pelunasan pembayaran bunga dilakukan setiap                July 15. PLN NR and SGPJB obtained approval from
    tanggal 15 Januari dan 15 Juli. PLN NR dan SGPJB           the General Meeting of Shareholders to change the
    telah mendapatkan persetujuan dari Rapat Umum              interest rate benchmark from LIBOR to SOFR,
    Pemegang Saham untuk melakukan perubahan                   effective from May 12, 2023. During six month periods
    acuan suku bunga dari LIBOR menjadi SOFR,                  ended June 30, 2025, SGPJB there was no payment
    berlaku efektif pada tanggal 12 Mei 2023. Selama           (December 2024: USD12,631,182 or equivalent to
    periode enam bulan yang berakhir pada tanggal 30           Rp204.082).
    Juni 2025, SGPJB belum melakukan pembayaran
    (Desember 2024: USD12.631.182 atau setara
    dengan Rp204.082).

    Pada tanggal 30 Juni 2025, saldo piutang pokok             As at June 30, 2025, PNP’s principal outstanding loan
    pinjaman dan bunga PNP dari SGPJB adalah                   and interest receivable balance from SGPJB was
    sebesar    USD22.194.739     (setara    dengan             USD22,194,739 (equivalent to Rp360,243) and
    Rp360.243)   dan    piutang   bunga    sebesar             interest receivables amounting to USD2.896.175
    USD2.896.175 (setara dengan Rp47.008).                     (equivalent to Rp47.008).

    Pada tanggal 31 Desember 2024, saldo piutang               As at December 31, 2024, PNP’s principal outstanding
    pokok pinjaman PNP dari SGPJB adalah sebesar               loan balance from SGPJB was USD22,148,346
    USD22.148.346 (setara dengan Rp357.851) dan                (equivalent to Rp357.851) and interest receivables
    piutang bunga sebesar USD5.084.997 (setara                 amounting to USD5,084,997 (equivalent to
    dengan Rp82.158).                                          Rp82.158).
Page 91
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/81 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                     NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                            FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                       JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)   (Expressed in millions of Rupiah, unless otherwise stated)

10. PIUTANG PIHAK BERELASI (lanjutan)                       10. RECEIVABLES        FROM      RELATED       PARTIES
                                                                (continued)

    PMSE                                                       PMSE

    Pada tanggal 30 Juni 2025, saldo piutang pokok             As at June 30, 2025, PMSE’s principal outstanding
    pinjaman PMSE dari PJBIC adalah sebesar                    loan balance from PJBIC was USD8,875,891
    USD8.875.891 (setara dengan Rp144.065) dan                 (equivalent to Rp144,065) and the balance of interest
    piutang bunga sebesar USD672.236 (setara                   receivables amounting to USD672,236 (setara
    dengan Rp10.911).                                          dengan Rp10,911).

    Pada tanggal 31 Desember 2024, saldo piutang               As at December 31, 2024, PMSE’s principal
    pokok pinjaman PMSE dari PJBIC adalah sebesar              outstanding loan balance from PJBIC was
    USD8.370.326 (setara dengan Rp135.239) dan                 USD8,370,326 (equivalent to Rp135,239), and the
    piutang bunga sebesar USD264.932 (setara                   balance of interest receivables amounted to
    dengan Rp4.281).                                           USD264,932 (equivalent to Rp4,281).

    GCL                                                        GCL

    Pada tanggal 27 Juni 2023, GCL, entitas asosiasi           On June 27, 2023, GCL, the associates of PIP,
    PIP, melalui Rapat Umum Pemegang Saham                     through the General Meeting of Shareholders
    (“RUPS”)     No.005/GMS-GCLIT/2023         telah           (“GMS”) No.005/GMS-GCLIT/2023, declared its
    mengumumkan divided kepada PIP, entitas anak               dividens to PIT, the subsidiary of PIP, which
    IP, sebesar USD3,500,000 (setara dengan                    amounted to USD3,500,000 (equivalent to
    Rp52.591).                                                 Rp52,591).

    Pada tanggal 30 Juni 2025 dan 31 Desember 2024,            As at June 30, 2025 and December 31, 2024, PIP’s
    saldo piutang PIP dari GCL masing-masing adalah            principal outstanding loan balance from GCL was
    sebesar USD5.958.814 (setara dengan Rp96.718)              USD5,958,814 (equivalent to Rp96,718) and
    dan USD5.838.314 (setara dengan Rp94.330)                  USD5,838,314 (equivalent to Rp94,330), respectively.

    IPB                                                        IPB

    Pada tanggal 25 Oktober 2023, IPB melalui Rapat            On October 25, 2023, IPB through the General
    Umum Pemegang Saham (“RUPS”) telah                         Meeting of Shareholders (“GMS”), declared its
    mengumumkan dividen kepada PIP sebesar                     dividends to PIP, which amounted to Rp1,881. IPB
    Rp1.881. IPB telah membayar kepada PIP sebesar             has paid PIP Rp470, and the remaining amount that
    Rp470 dan sisanya yang belum dibayarkan                    has not been paid amounted to Rp1,411.
    sebesar Rp1.411.


    Pada tanggal 30 Juni 2025, saldo piutang PIP dari          As at June 30, 2025, PIP’s principal outstanding
    IPB adalah sebesar USD157.292 (setara dengan               loan balance from IPB was USD157,292
    Rp2.553).                                                  (equivalent to Rp2,553).


    Pada tanggal 31 Desember 2024, saldo piutang               As at December 31, 2024, PIP’s principal
    PIP dari IPB masing-masing adalah sebesar                  outstanding loan balance from IPB was amounting
    RpNihil.                                                   to RpNil.


    Lihat Catatan 51 untuk informasi rincian transaksi         Refer to Note 51 for the information on the details of
    dan saldo dengan pihak berelasi.                           transactions and balances with related parties.
Page 92
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/82 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                         NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                           JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)       (Expressed in millions of Rupiah, unless otherwise stated)

11. REKENING BANK DIBATASI PENGGUNAANNYA                        11. RESTRICTED CASH IN BANKS


                                                 30 Juni/       31 Desember/
                                                 June 30,       December 31,
                                                   2025             2024


    Jaminan bank garansi                                                                                   Bank guarantee
      Pihak berelasi:                                                                                      Related parties:
        PT Bank Rakyat Indonesia (Persero) Tbk                                    PT Bank Rakyat Indonesia (Persero) Tbk
        (“BRI”)                                                                                                     (“BRI”)
          Rupiah                                     24,973            39,973                                  Rupiah
          USD                                        31,006            31,006                                    USD
        PT Bank Mandiri (Persero) Tbk                                                      PT Bank Mandiri (Persero) Tbk
        (“Bank Mandiri”)                                                                                 (“Bank Mandiri”)
          Rupiah                                     15,359            46,350                                  Rupiah
          USD                                        41,200            41,200                                    USD
        PT Bank Negara Indonesia (Persero) Tbk                                    PT Bank Negara Indonesia (Persero) Tbk
        (“BNI”)                                                                                                     (“BNI”)
          Rupiah                                     68,056            20,272                                  Rupiah
        PT Bank Pembangunan Daerah                                                        PT Bank Pembangunan Daerah
        ("BPD Jatim")                                                                                       ("BPD Jatim")
          Rupiah                                            -             283                                    Rupiah
      Pihak ketiga:                                                                                            Third parties:
        PT Bank KB Bukopin Tbk                                                                  PT Bank KB Bukopin Tbk
        (“Bank Bukopin”)                                                                                (“Bank Bukopin”)
          Rupiah                                            -          16,749                                  Rupiah
        PT Bank CIMB Niaga Tbk                                                                  PT Bank CIMB Niaga Tbk
        ("CIMB Niaga")                                                                                    ("CIMB Niaga")
          Rupiah                                     47,985            55,307                                  Rupiah
          USD                                         2,013                 -                                    USD
          MYR                                         1,202                 -                                    MYR
        PT Bank Permata
          Rupiah                                         25
    Subjumlah                                     3,667,318         3,522,217                                       Subtotal
    Cadangan kerugian kredit ekspektasian                (3)               (2)             Allowance for expected credit loss
    Jumlah                                        3,667,315         3,522,215                                           Total

    Dikurangi: bagian lancar                        231,818           232,510                          Less: current portion
    Bagian tidak lancar                           3,435,497         3,289,705                          Non - current portion



    Tingkat bunga deposito                                                                          Interest rate per annum
       berjangka per tahun                                                                               on time deposits
       Rupiah                                3.54% - 5.98%        1.50% - 6.25%                                    Rupiah
       USD                                   2.52% - 4.66%        2.00% - 2.57%                                      USD

    Perusahaan menempatkan dana cadangan pada                      The Company established a reserve account with
    Sumitomo Mitsui Banking Corporation, Singapura                 Sumitomo Mitsui Banking Corporation, Singapore
    sebesar JPY21.887.550.121 dan USD59.875.385                    amounting       to    JPY21,887,550,121    and
    pada tanggal 30 Juni 2025 (Desember 2024:                      USD59,875,385 as at June 30, 2025 (December
    JPY22.523.144.616 dan USD58.275.261) untuk                     2024: JPY22,523,144,616 and USD58,275,261 to
    memenuhi persyaratan Financial Lease Agreement                 fulfil the requirements of the Financial Lease
                                                                   Agreement (Note 26).
    (Catatan 26).

    Jaminan bank garansi merupakan rekening bank                   Bank guarantees represent cash in banks and were
    yang digunakan untuk jaminan pelaksanaan proyek                used as collateral for projects and services provided
    dan pemberian jasa oleh Grup.                                  by the Group.
Page 93
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                  Lampiran 5/83 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                             NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                    FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                               JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)           (Expressed in millions of Rupiah, unless otherwise stated)

11. REKENING BANK DIBATASI PENGGUNAANNYA                           11. RESTRICTED CASH IN BANKS (continued)
    (lanjutan)

    Rincian rekening bank dibatasi penggunaannya                       Details of restricted cash in banks by currency are as
    berdasarkan mata uang adalah sebagai berikut:                      follows:

                                     30 Juni/June 30, 2025                   31 Desember/December 31, 2024
                              Dalam mata                                     Dalam mata
                             uang original/                                 uang original/
                               In original        Ekuivalen Rp/               In original      Ekuivalen Rp/
                             currencies *)        Rp equivalent             currencies *)      Rp equivalent

    Rupiah                         156,397               156,397                     178,934                     178,934         Rupiah
    JPY                      21,877,550,12             2,463,662              22,523,144,616                   2,329,524           JPY
                                         1
    USD                         64,448,072             1,046,057                    62,744,309                 1,013,759           USD
    MYR                            311,993                 1,202                                                                   MYR

    Jumlah                                              3,667,318                                              3,522,217           Total

    *) Dalam jumlah penuh, kecuali Rupiah                               *) In full amount, except for Rupiah

    Lihat Catatan 51 untuk informasi rincian transaksi                 Refer to Note 51 for information on the details of
    dan saldo dengan pihak berelasi.                                   transactions and balances with related parties.


12. ASET TIDAK LANCAR LAIN                                         12. OTHER NON-CURRENT ASSETS

                                                     30 Juni/            31 Desember/
                                                     June 30,            December 31,
                                                       2025                  2024

     Properti pertambangan                             1,804,958                1,832,596                              Mining properties

     Pengembangan proyek                               4,377,046                3,728,267                           Project development

     Biaya dibayar di muka                                                                                               Prepayments
      Pembelian gas                                     212,519                   186,138                              Gas purchased
      Lain-lain                                         303,347                    52,053                                     Others

     Subjumlah                                          515,866                   238,191                                       Subtotal

     Aset tak berwujud                                                                                                 Intangible assets
     Piranti lunak                                     1,138,598                1,106,003                                      Software
     Biaya legal terkait                                                                                              Legal cost for land
      hak atas tanah                                    265,467                   269,295                              and lands rights

     Subjumlah                                         1,404,065                1,375,298                                       Subtotal

     Biaya kontrak                                      780,268                   774,918                                  Contract cost

     Lain-lain                                             8,961                  168,791                                        Others

     Jumlah                                            8,891,165                8,118,061                                          Total

    Manajemen Grup meyakini bahwa properti                             Management of the Group believes that the mining
    pertambangan, uang muka, dan biaya dibayar di                      properties, advances, and prepayments are
    muka dapat dipulihkan.                                             recoverable.

    Beban amortisasi aset tak berwujud dan biaya                       Amortisation of intangible assets and contract cost for
    kontrak untuk periode enam bulan yang berakhir                     the six month periods ended June 30, 2025 and 2024,
    pada tanggal 30 Juni 2025 dan 2024, masing-                        amounting to Rp423,519 and Rp489,077 respectively,
    masing sebesar Rp423.519 dan Rp489.077                             is presented as part of other operating expenses (Note
    disajikan sebagai beban usaha lain-lain (Catatan                   44).
    44).
Page 94
                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/84 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                               FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                          JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)      (Expressed in millions of Rupiah, unless otherwise stated)

13. KAS DAN SETARA KAS                                         13. CASH AND CASH EQUIVALENTS

                                                30 Juni/       31 Desember/
                                                June 30,       December 31,
                                                  2025             2024


    Kas                                             16,646            32,124                                   Cash on hand
    Bank                                                                                                      Cash in banks
     Entitas yang berelasi dengan
       Pemerintah                                                                             Government related entities
       Bank Mandiri                                                                                        Bank Mandiri
         Rupiah                                   9,978,171       15,044,042                                  Rupiah
         USD                                        916,138        1,261,092                                     USD
         EUR                                         10,478          207,481                                     EUR
         JPY                                        317,407           44,058                                      JPY
         MYR                                        122,006            5,181                                     MYR
       BNI                                                                                                          BNI
         Rupiah                                  14,924,655       11,531,570                                  Rupiah
         USD                                      1,584,579        2,323,279                                     USD
         EUR                                         38,171          135,146                                     EUR
         JPY                                         83,235          173,493                                      JPY
         MYR                                          2,698            2,538                                     MYR
       BRI                                                                                                           BRI
         Rupiah                                  10,163,752       12,321,013                                  Rupiah
         USD                                      1,307,446        4,959,362                                     USD
         EUR                                         33,725          342,907                                     EUR
         JPY                                         14,243           68,285                                      JPY
       BTN                                                                                                         BTN
         Rupiah                                    340,958         3,237,619                                  Rupiah
       Bank Syariah Indonesia ("BSI")                                                     Bank Syariah Indonesia ("BSI")
         Rupiah                                   1,128,882        1,422,752                                  Rupiah
         USD                                                             797                                     USD
       PT Bank DKI (“Bank DKI”)                                                              PT Bank DKI (“Bank DKI”)
         Rupiah                                    222,397           545,683                                 Rupiah
         USD                                             -                 -                                     USD
         JPY                                             -                 -                                      JPY
      Subjumlah                                  41,188,941       53,626,298                                       Subtotal
      Cadangan kerugian kredit ekspektasian             (20)             (16)            Allowance for expected credit loss
      Jumlah entitas yang berelasi                                                                       Total Government
          dengan Pemerintah                      41,188,921       53,626,282

      Pihak ketiga                                                                                         Third parties
        PT Bank Danamon Indonesia Tbk                                                PT Bank Danamon Indonesia Tbk
          (“Bank Danamon”)                                                                        (“Bank Danamon”)
          Rupiah                                   628,114           522,749                                Rupiah
        PT Bank OCBC NISP Tbk                                                               PT Bank OCBC NISP Tbk
          (“Bank OCBC NISP”)                                                                   (“Bank OCBC NISP”)
          Rupiah                                    45,143           405,133                                Rupiah
        PT Bank Maybank Indonesia Tbk                                                  PT Bank Maybank Indonesia Tbk
          (“Bank Maybank Indonesia”)                                                      (“Bank Maybank Indonesia”)
          Rupiah                                   136,235           437,722                                Rupiah
        PT Bank Central Asia Tbk                                                             PT Bank Central Asia Tbk
          (“BCA”)                                                                                           (“BCA”)
          Rupiah                                   337,874         2,077,643                                Rupiah
        Bank Bukopin                                                                                    Bank Bukopin
          Rupiah                                   256,983           261,668                                Rupiah
          JPY                                       33,266            30,552                                   JPY
          USD                                        7,476             7,439                                   USD
          EUR                                            -                 -                                   EUR
        Lain-lain (masing-masing                                                                              Others
          dibawah 5% dari jumlah)                                                           (each below 5% of total)
          Rupiah                                    522,527          367,154                                Rupiah
          USD                                     1,464,996        1,438,198                                   USD
          EUR                                         8,320            8,282                                   EUR
          Dinar Kuwait                               61,839           18,818                                  KWD
      Subjumlah                                   3,502,773        5,575,358                                     Subtotal
      Cadangan kerugian kredit ekspektasian              (3)              (3)           Allowance for expected credit loss
      Jumlah pihak ketiga                         3,502,770        5,575,355                             Total third parties
    Jumlah kas dan bank                          44,708,337       59,233,761              Total cash on hand and in banks
Page 95
                      PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                   DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                 Lampiran 5/85 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                             NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                    FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                               JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)           (Expressed in millions of Rupiah, unless otherwise stated)

13. KAS DAN SETARA KAS (lanjutan)                                  13. CASH AND CASH EQUIVALENTS (continued)

                                                   30 Juni/         31 Desember/
                                                   June 30,         December 31,
                                                     2025               2024
    Setara kas - deposito berjangka                                                                  Cash equivalents - time deposits
     Pihak berelasi                                                                                                Related parties
       BRI                                                                                                                     BRI
         Rupiah                                      1,004,398            912,500                                       Rupiah
         USD                                           418,529            517,708                                          USD
       BNI                                                                                                                    BNI
         Rupiah                                         47,147             82,500                                       Rupiah
       Bank Mandiri                                                                                                Bank Mandiri
         Rupiah                                        107,338             13,350                                       Rupiah
         USD                                            10,000            116,330                                            USD
       BTN                                                                                                                   BTN
         Rupiah                                               -           155,000                                       Rupiah
         USD                                                  -            80,785                                          USD
       BSI                                                                                                                     BSI
         Rupiah                                        260,000            210,000                                       Rupiah
      Jumlah pihak berelasi                          1,847,412          2,088,173                                Total related parties

      Pihak ketiga                                                                                                       Third parties
        Bank Bukopin                                                                                                Bank Bukopin
          Rupiah                                        59,149             42,400                                        Rupiah
        Lain-lain (masing-masing                                                                                             Others
          dibawah 5% dari jumlah)                                                                         (each below 5% of total)
          Rupiah                                           112                112                                          Rupiah
      Jumlah pihak ketiga                               59,261             42,512                                Total third parties
      Jumlah deposito berjangka                      1,906,673          2,130,685                                Total time deposits
    Jumlah kas dan setara kas                      46,615,010          61,364,446                    Total cash and cash equivalent


    Tingkat bunga deposito berjangka                                                                      Interest rate per annum on
     per tahun                                                                                                         time deposits
     Rupiah                                      4.64% - 5.78%         4.32% - 5.44%                                         Rupiah
     USD                                        3.57% - 5.77 %         4.32% - 5.44%                                           USD
    Jangka waktu                              1 - 3 Bulan/Months    1 - 3 Bulan/Months                                        Maturity

    Rincian kas dan setara kas berdasarkan mata uang                   Details of cash and cash equivalents by currency are
    adalah sebagai berikut:                                            as follows:

                                   30 Juni/June 30, 2025                     31 Desember/December 31, 2024
                            Dalam mata                                       Dalam mata
                           uang original/                                   uang original/
                             In original        Ekuivalen Rp/                 In original        Ekuivalen
                           currencies *)        Rp equivalent               currencies *)           Rp/
                                                                                                     Rp
                                                                                                 equivalent

      Rupiah                    40,180,458           40,180,458                  49,622,715               49,622,715       Rupiah
      USD                      339,456,144            5,709,164                 662,560,515               10,704,990         USD
      EUR                        4,765,401               90,694                  41,242,909                  693,816         EUR
      JPY                    3,979,636,255              448,151               3,059,017,290                  316,388         JPY
      Lain-lain **)             11,492,990              186,543                   1,642,458                   26,537       Others
                                                                                                                               **)

      Jumlah                                         46,615,010                                           61,364,446         Total

      *) Dalam jumlah penuh, kecuali Rupiah                                *) In full amount, except Rupiah

    Lihat Catatan 51 untuk informasi rincian transaksi                  Refer to Note 51 for information on the details of
    dan saldo dengan pihak berelasi.                                    transactions and balances with related parties.
Page 96
                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/86 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                         NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                           JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)       (Expressed in millions of Rupiah, unless otherwise stated)

14. INVESTASI JANGKA PENDEK                                     14. SHORT-TERM INVESTMENTS


                                               30 Juni/                   31 Desember/
                                               June 30,                   December 31,
                                                 2025                         2024

     Deposito berjangka                                                                                             Time deposits
       Pihak berelasi                                                                                          Related parties
        BRI                                                                                                              BRI
         Rupiah                                        19,303                       139,200                         Rupiah
         USD                                                -                       804,660                            USD
        Bank Mandiri                                                                                           Bank Mandiri
         Rupiah                                   1,096,005                            1,603                        Rupiah
         USD                                              -                                -                           USD
        BNI                                                                                                              BNI
         Rupiah                                     135,106                             106                         Rupiah
         USD                                            122                          31,531                            USD
       Jumlah pihak berelasi                      1,250,536                         977,100                Total related parties

     Investasi lain-lain                                                                                       Other investments
       Rupiah                                           6,697                          7,487                           Rupiah

     Jumlah                                       1,257,233                         984,587                                 Total


    Tingkat bunga deposito berjangka                                                                  Interest rate per annum on
       per tahun                                                                                                   time deposits
       Rupiah                                3.54% - 5.98%        4.93% - 5.78%                                          Rupiah
       USD                                   2.52% - 3.98%        1.74% - 4.55%                                            USD
    Jangka waktu                                                                                                          Maturity
       Rupiah                                  6 - 12 Bulan/        6 - 12 Bulan/                                        Rupiah
                                                    Months               Months
      USD                                      6 - 12 Bulan/        6 - 12 Bulan/                                          USD
                                                    Months               Months

    Lihat Catatan 51 untuk informasi rincian transaksi             Refer to Note 51 for information on the details of
    dan saldo dengan pihak berelasi.                               transactions and balances with related parties.

15. PIUTANG USAHA                                               15. TRADE RECEIVABLES

                                            30 Juni/               31 Desember/
                                            June 30,               December 31,
                                              2025                     2024

     Pihak berelasi                                                                                         Related parties
     Entitas berelasi dengan pemerintah        3,018,180                  2,648,312                Government related entities
     Cadangan     kerugian      kredit                                                  Allowance for expected credit losses
     ekspektasian                              (101,347)                    (79,189)
     Subjumlah                                 2,916,833                  2,569,123                                   Subtotal

     Pihak ketiga                                                                                                Third parties
     Umum                                     27,790,184                 27,791,005                                     Public
     Tentara Nasional Indonesia dan                                                            Tentara Nasional Indonesia and
     Kepolisian Negara Republik                                                                   Kepolisian Negara Republik
     Indonesia                                                                                                       Indonesia
     (TNI dan POLRI)                           1,041,483                    799,506                          (TNI dan POLRI)
     Subjumlah                                28,831,667                 28,590,511                                    Subtotal

     Cadangan kerugian kredit                                                                          Allowance for expected
     ekspektasian                             (3,481,786)                (3,513,232)                          credit losses
     Subjumlah                                25,349,881                 25,077,279                                   Subtotal

     Jumlah, bersih                           28,266,714                 27,646,402                                 Total, net
Page 97
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/87 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                         NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                           JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)       (Expressed in millions of Rupiah, unless otherwise stated)

15. PIUTANG USAHA (lanjutan)                                    15. TRADE RECEIVABLES (continued)

    Analisis umur piutang usaha adalah sebagai berikut:            The aging analysis of trade receivables is as follows:

                                               30 Juni/              31 Desember/
                                               June 30,              December 31,
                                                 2025                    2024

     Belum jatuh tempo                           25,355,129                26,115,349                          Not yet due
     Lewat jatuh tempo                                                                                           Past due
        1 s/d 30 hari                              707,814                    769,304                      1 to 30 days
        31 s/d 60 hari                             304,195                    285,700                     31 to 60 days
        61 s/d 360 hari                           1,315,293                    622,977                  61 to 360 days
        Lebih dari 360 hari                       4,167,416                  3,445,493              More than 360 days

     Jumlah                                      31,849,847                31,238,823                                Total

    Pergerakan    perubahan     cadangan        kerugian           The movement of changes in the allowance for
    penurunan nilai adalah sebagai berikut:                        impairment losses is as follows:


                                              30 Juni/                 31 Desember/
                                              June 30,                 December 31,
                                                2025                       2024

     Saldo awal                                    3,592,421               3,907,316                Balance at beginning
     Penambahan                                       (8,054)              (311,219)                           Additions
     Penghapusan                                     (1,234)                  (3,676)                         Write-off

     Saldo akhir                                   3,583,133               3,592,421                    Ending balance



    Piutang usaha Perusahaan dan PLN Batam dijamin                 The Company and PLN Batam’s trade receivables are
    sebagian dengan uang jaminan langganan jika                    partially secured by customer security deposits in case
    terjadi kegagalan pembayaran (Catatan 34).                     of default (Note 34).

    Pada tanggal 30 Juni 2025 dan 31 Desember 2024,                 As at June 30, 2025 and December 31, 2024, all
    seluruh nilai tercatat piutang usaha Grup didominasi            carrying amounts of the Group’s trade receivables
    Rupiah.                                                         were dominated in Rupiah.

    Pada tanggal 30 Juni 2025, piutang usaha sebesar                As at June 30, 2025 trade receivables amounted to
    Rp31.849.847 mengalami penurunan nilai dan telah                Rp31,849,847 were impaired and have been
    diprovisikan sebesar Rp3.583.133. Piutang usaha                 provisioned by Rp3,583,133 after considering the
    yang diturunkan nilainya terutama terkait dengan                customers security deposits. The impaired trade
    pelanggan umum yang belum melakukan                             receivables mainly relate to public customers who
    pembayaran piutang lebih dari tiga bulan.                       have not paid the receivables for more than three
                                                                    months.

    Manajemen berkeyakinan bahwa tidak ada risiko                   Management believes there is no heightened risk of
    kredit kualitas yang buruk atas piutang usaha                   poor credit quality of trade receivables because the
    karena Grup memiliki jumlah pelanggan yang besar,               Group has a broad customer base, dispersed across
    tersebar mencakup segmen pasar dan area                         varying market segments and geographic locations
    geografis yang luas di seluruh Indonesia.                       throughout Indonesia. This assessment is also
    Kesimpulan ini didukung juga oleh data historis                 supported by the Group’s good historical collection
    kolektibilitas Grup atas piutang usaha yang baik                rates of trade receivables across the periods.
    selama beberapa periode. Oleh karena itu,                       Therefore, management is of the opinion that the
    manajemen berpendapat bahwa cadangan atas                       allowance for expected credit loss of trade
    kerugian kredit ekspektasian atas piutang usaha                 receivables is adequate.
    adalah cukup.

    Lihat Catatan 51 untuk informasi rincian transaksi              Refer to Note 51 for information on the details of
    dan saldo dengan pihak berelasi.                                transactions and balances with related parties.
Page 98
                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/88 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                       NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                              FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                         JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)     (Expressed in millions of Rupiah, unless otherwise stated)

16. PIUTANG DARI PEMERINTAH                                   16. RECEIVABLES FROM GOVERNMENT

    Piutang dari Pemerintah terdiri atas piutang                 Receivables from the Government consist of
    kompensasi dan piutang subsidi listrik kepada Grup.          compensation receivables and electricity subsidy
                                                                 receivables to the Group.

                                              30 Juni/             31 Desember/
                                              June 30,             December 31,
                                                2025                   2024

     Piutang kompensasi                          55,113,607            37,450,898              Compensation receivables
     Piutang subsidi listrik (catatan 37)        23,335,243             5,839,850        Receivables for electricity subsidy
                                                                                                                   (note 37)
     Jumlah                                      78,448,850            43,290,748                                      Total

    Piutang kompensasi                                           Compensation receivables

    Piutang kompensasi merupakan piutang atas                    Compensation receivables represent receivables of
    pendapatan kompensasi dari Pemerintah yang                   compensation revenue from the Government that
    belum diterima untuk penggantian perbedaan tarif             have not yet been received for the difference between
    aktual dan tarif yang dihitung oleh Grup. Grup selalu        the actual tariff charged versus the tariffs calculated by
    menerima keputusan tarif tetap dari Pemerintah.              the Group. The Group has always accepted the fixed
    Dengan kata lain, perhitungan yang dilakukan oleh            electricity tariff decision from the Government. In other
    Grup terkait tarif listrik tidak disetujui oleh              words, the calculation of the electricity tariff proposed
    Kementerian        ESDM.        Grup      diharuskan         by the Group was not approved by the Ministry of
    menggunakan tarif listrik tetap yang sudah disetujui         ESDM. The Group was required to use a fixed
    atau tarif aktual.                                           electricity tariff that had been approved or the actual
                                                                 tariff.


    Berdasarkan       PMK        No.    159/PMK.02/2022,         Based on PMK No. 159/PMK.02/2022, the Company
    Perusahaan mencatat pendapatan dan piutang                   records compensation income and receivables in
    kompensasi sesuai dengan asersi manajemen dan                accordance with management estimates and they will
    akan    ditetapkan      sebagai      kebijakan  dana         finally be determined based on the compensation fund
    kompensasi oleh Menteri Keuangan berdasarkan                 policy by the Minister of Finance based on the results
    hasil reviu oleh BPKP. Finalisasi kebijakan dana             of the review by BPKP. Finalisation of the
    kompensasi tersebut akan dilakukan berdasarkan               compensation fund policy will be made based on the
    LHP BPK. Perbedaan yang timbul dari hasil audit              LHP of the BPK. Any differences from the audit of BPK
    BPK akan mempengaruhi laba rugi pada tahun audit             will impact profit or loss in the year the audit is
    tersebut difinalisasi. Nilai piutang kompensasi pada         finalised. The amount of compensation receivables as
    tanggal 31 Desember 2023 diakui berdasarkan                  at December 31, 2023 was recognised based on
    estimasi terbaik manajemen dan telah direviu oleh            management’s best estimate which have been
    BPKP. Nilai piutang kompensasi pada tanggal 31               reviewed by BPKP. The amount of compensation
    Desember 2024 diakui berdasarkan hasil audit BPK.            receivables as at December 31, 2024 was recognised
                                                                 based on the results of the BPK audit.

    Berdasarkan       Kebijakan     Pemerintah    atas           Based on the Government Policy regarding PT PLN
    Kekurangan Penerimaan PT PLN (Persero) akibat                (Persero)’s Revenue Shortfall due to the 2023
    Penetapan Tarif Tenaga Listrik Tahun 2023 yang               Electricity Tariff Determination issued by the Ministry
    diterbitkan oleh Kementerian Keuangan tanggal 13             of Finance on March 13, 2024, the value of the
    Maret 2024, nilai dana kompensasi pada tahun 2023            compensation fund in 2023 is Rp74,014,279. During
    sebesar Rp74.014.279. Selama tahun 2023, Grup                2023, the Group has received compensation
    telah menerima pembayaran kompensasi tahun                   payments for 2023 amounted to Rp56,179,082 and
    2023 sebesar Rp56.179.082 dan selama periode                 during the period ending 31 December 2023, the
    yang berakhir pada tanggal 31 Desember 2023                  Group has received a shortfall in compensation
    Grup telah menerima kekurangan pembayaran                    payments for 2022 amounted to Rp16,770,789 with
    kompensasi tahun 2022 sebesar Rp16.770.789                   details received in cash amounted to Rp16,094,804
    dengan rinciannya diterima kas sebesar Rp                    and set-off with excess compensation received in
    16.094.804      dan    disalinghapuskan    dengan            2022 from the Government amounting to Rp675,985.
    kelebihan penerimaan kompensasi tahun 2022 dari              The balance compensation receivables at 2023
    Pemerintah sebesar Rp675.985. Sehingga saldo                 Rp17,835,197.
    piutang kompensasi tahun 2023 Rp17.835.197.
Page 99
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/89 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                             FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                        JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)    (Expressed in millions of Rupiah, unless otherwise stated)

16. PIUTANG DARI PEMERINTAH (lanjutan)                          16. RECEIVABLES           FROM        GOVERNMENT
                                                                (continued)

    Berdasarkan Berita Acara Hasil Pemeriksaan                  Based on Minutes of Audit and calculation of electricity
    perhitungan dana kompansasi listrik tahun 2023              compensation for fiscal year 2023 issued by BPK on
    yang diterbitkan oleh BPK tanggal 27 Mei 2024, nilai        May 27, 2024, the amount of the compensation in
    dana kompansasi pada tahun 2023 sebesar                     2023 amounted to Rp73,995,537 so there was an
    Rp73.995.537      sehingga terdapat      kelebihan          excess of 2023 compensation received amounted to
    penerimaan kompansasl listrik tahun 2023 sebesar            Rp18,742.
    Rp18.742.

    Berdasarkan Berita Acara Hasil Pemeriksaan                  Based on Minutes of Audit and calculation of electricity
    perhitungan dana kompensasi listrik tahun 2024              compensation for fiscal year 2024 issued by BPK on
    yang diterbitkan oleh BPK tanggal 5 Mei 2025 nilai          May 5, 2025, the amount of the compensation in 2024
    dana kompensasi pada tahun 2024 sebesar                     amounted to Rp100,202,786. During 2024, Group has
    Rp100.202.786. Selama tahun 2024, Grup telah                received payment of compensation 2023 and 2024
    menerima pembayaran kompensasi tahun 2023 dan               amounted to Rp80,568,343 include set off with an
    2024 sebesar Rp80.568.343 termasuk set-off                  excess of 2023 compensation received amounted to
    dengan kelebihan penerimaan kompensasi tahun                Rp18,742. Balance of compensation receivables at 31
    2023 senilai Rp18.742. Sehingga saldo piutang               December 2024 amounted to Rp37,450,898.
    kompensasi pada tanggal 31 Desember 2024
    sebesar Rp37.450.898.

    Sampai dengan 30 Juni 2025, Grup telah menerima             Until June 30, 2025, Grup received payment of
    pembayaran kompensasi tahun 2024 sebesar                    compensation 2024 amounted to Rp37,450,898. For
    Rp37.450.898. Untuk kompensasi tahun 2025, Grup             2025 compensation, the Group hasn't received
    belum menerima pembayaran. Sehingga saldo                   payment. Balance of compensation receivables at
    piutang kompensasi pada tanggal 30 Juni 2025                June 30, 2025 amounted Rp55,113,607.
    sebesar Rp55.113.607.


    Lihat Catatan 37 untuk informasi rincian piutang            Refer to Note 37 for information on the details of
    subsidi listrik.                                            receivables for electricity subsidy.

    Lihat Catatan 51 untuk informasi rincian transaksi          Refer to Note 51 for information on the details of
    dan saldo dengan pihak berelasi.                            transactions and balances with related parties.


17. PIUTANG LAIN-LAIN                                        17. OTHER RECEIVABLES


                                              30 Juni/          31 Desember/
                                              June 30,          December 31,
                                                2025                2024

     Pihak ketiga                                2,715,706            2,551,535                            Third parties
     Karyawan                                    1,203,646            1,222,650                             Employees
     Lain-lain                                   1,383,542            1,143,951                                  Others

     Jumlah                                      5,302,894            4,918,136                                   Total

     Dikurangi : bagian lancar                   3,669,388            3,417,791                  Less : current portion

     Bagian tidak lancar                         1,633,506            1,500,345                   Non-current portion



    Piutang    karyawan      merupakan  pinjaman                Receivables from employees represent housing
    kepemilikan rumah yang pelunasannya dilakukan               loans, which are paid monthly through salary
    melalui pemotongan gaji.                                    deduction.
Page 100
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/90 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                               FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                          JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)      (Expressed in millions of Rupiah, unless otherwise stated)


17. PIUTANG LAIN-LAIN (lanjutan)                              17. OTHER RECEIVABLES (continued)

    Piutang pekerjaan pihak ketiga sebagian besar                 Third party work receivables mostly consist of
    terdiri dari piutang atas penjualan LNG kepada                receivables from LNG sales to Jawa Satu Power.
    Jawa Satu Power.
    Lain-lain sebagian besar terdiri dari piutang non-            Others mostly consist of non-electricity receivables
    listrik yang akan dilunasi dengan pembayaran tunai            which will be repaid by cash payments and
    dan piutang dari vendor yang akan dilunasi dengan             receivables from vendor which will be settled
    pemotongan tagihan vendor.                                    through cash payments or deduction of vendor
                                                                  invoices.

18. PERSEDIAAN                                                18. INVENTORIES


                                             30 Juni/           31 Desember/
                                             June 30,           December 31,
                                               2025                 2024

    Batu bara bahan bakar dan pelumas         16,357,220            14,630,846                      Coal fuel and lubricants
    Persediaan umum                            4,279,238             3,156,915                             General supplies
    Switchgear dan jaringan                    2,019,090             1,607,985                   Switchgear and networking
    Alat ukur, pembatas dan kontrol            1,173,175             1,012,399                   Meter recording device and
                                                                                                          control equipment
    Transformator                                283,115               177,898                                Transformers
    Kabel                                        170,297               137,418                                          Wire
    Biomassa                                      52,884                40,615                                     Biomass

    Jumlah                                    24,335,019            20,764,076                                          Total
    Cadangan kerugian penurunan                                                 Allowance for decline in value of inventories
      nilai dan persediaan usang                (639,597)             (624,276)             and inventory obsolescence


    Jumlah, bersih                            23,695,422            20,139,800                                    Total, net



    Pergerakan     perubahan cadangan   kerugian                  The movement of changes in allowance for decline in
    penurunan nilai dan persediaan usang adalah                   value of inventories and inventory obsolescence is as
    sebagai berikut:                                              follows:

                                                 30 Juni/           31 Desember/
                                                 June 30,           December 31,
                                                   2025                 2024

     Saldo awal tahun                               624,276                548,565                        Beginning balace
     Penambahan                                      15,321                 75,711                               Additions

     Saldo akhir                                    639,597                624,276                        Ending balance

    Grup tidak mengasuransikan persediaan untuk                   The Group does not have any insurance to cover the
    menutup risiko atas kemungkinan kerugian yang                 possible losses on inventories except for coal stock in
    timbul pada persediaan kecuali persediaan batu                Unit Tanjung Jati B which were insured with PT
    bara di Unit Tanjung Jati B yang diasuransikan                Asuransi Mitsui Sumitomo Indonesia against fire and
    kepada PT Asuransi Mitsui Sumitomo Indonesia                  other possible risks with insurance coverage of USD
    terhadap risiko kebakaran dan risiko lainnya dengan           62,000,000 (full amount) or        or equivalent to
    jumlah pertanggungan sebesar USD62.000.000                    Rp1,006,322 (December 2024: 62,000,000 (full
    (nilai penuh) atau setara dengan Rp1.006.322                  amount) or or equivalent to Rp1.001.734). The
    (Desember 2024: USD62.000.000 (nilai penuh) atau              Group’s management believes that the inventories
    setara dengan Rp1.001.734). Manajemen Grup                    were adequately insured as at June 30, 2025 and
    berpendapat bahwa persediaan tersebut telah                   December 31, 2024.
    diasuransikan secara memadai pada tanggal 30
    Juni 2025 dan 31 Desember 2024.
Page 101
                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                               Lampiran 5/91 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                         NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                           JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)       (Expressed in millions of Rupiah, unless otherwise stated)

18. PERSEDIAAN (lanjutan)                                      18. INVENTORIES (continued)

    Jumlah persediaan yang diakui sebagai beban                    The total amount of inventories recognised as
    untuk tahun yang berakhir pada tanggal 30 Juni                 expenses for the years ended June 30, 2025 and 2024
    2025 dan 2024 adalah masing-masing sebesar                     amounted to Rp61,469,102 and Rp58,955,584
    Rp61.469.102 dan Rp58.955.584.                                 respectively.

    Manajemen berpendapat bahwa penyisihan yang                    Management believes that the allowance is adequate
    ditetapkan memadai untuk menutup risiko                        to cover possible losses on the decline in the value of
    penurunan nilai persediaan dan persediaan usang.               inventories and inventory obsolescence.


19. PAJAK DIBAYAR DI MUKA                                      19. PREPAID TAXES

                                                30 Juni/           31 Desember/
                                                June 30,           December 31,
                                                  2025                 2024

    Pajak Pertambahan Nilai ("PPN")               1,967,470             2,539,394                    Value-Added Tax ("VAT")
    Pajak Penghasilan Badan ("PPh")                                                        Overpayment of Corporate Income
     lebih bayar                                                                                                  Tax ("CIT")
    PPh Badan                                                                                                            CIT
    2025                                          2,188,553                    -                                     2025
    2024                                            231,527              742,520                                     2024
    2023                                            111,873              199,781                                     2023
    2022                                                  -                4,544                                     2022
    Bea meterai                                      43,873               43,873                                 Stamp duty
    Lebih bayar PPh 21                               45,464               46,165         Overpayment of Income tax Article 21
    Lebih bayar PPh Pasal 4 (2)                       6,973               28,199          Overpayment of Income tax Article 4
                                                                                                                           (2)
    Pembayaran dimuka atas Surat Ketetapan                                                   Prepayments of Tax Assessment
    Pajak Kurang Bayar (Catatan 47c)             22,410,570           21,025,734         Letters for Underpayment (Note 47c)

    Jumlah                                       27,006,303           24,630,210                                          Total
    Provisi atas ketidakpastian posisi pajak     (9,615,323)          (6,885,770)    Provision against uncertain tax treatment

    Jumlah, bersih                               17,390,980           17,744,440                                     Total, net

    Dikurangi: bagian lancar                      7,588,084             5,403,503                      Less: current portion

    Bagian tidak lancar                           9,802,896           12,340,937                        Non-current portion


    Selama periode enam bulan yang berakhir 30 Juni               During the six month period ended June 30, 2025, the
    2025, Grup telah melakukan penghapusan atas                   Group has written off the excess payment of Corporate
    kelebihan bayar PPh Badan tahun 2022 sebesar                  Income Tax for 2022 amounting to Rp4,544, Corporate
    Rp4.544, PPh Badan untuk tahun 2023 Rp87.908,                 Income Tax for 2023 amounting to Rp87,908, and
    dan PPh Badan tahun 2024 sebesar Rp510.993.                   Corporate Income Tax for 2024 amounting to
                                                                  Rp510,993.

    Lihat Catatan 47 untuk informasi mengenai beban               Refer to Note 47 for income tax expense information
    pajak penghasilan dan surat ketetapan pajak.                  and tax assessment letters.
Page 102
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/92 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                     NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                            FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                       JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)   (Expressed in millions of Rupiah, unless otherwise stated)

20. BIAYA DIBAYAR DI MUKA DAN UANG MUKA                     20. PREPAID EXPENSES AND ADVANCES

                                             30 Juni/         31 Desember/
                                             June 30,         December 31,
                                               2025               2024

     Biaya dibayar di muka                                                                           Prepaid expenses
       Premi asuransi                          1,897,828           3,118,897                              Insurance
       Sewa                                      258,878              50,255                                   Rent

     Subjumlah                                 2,156,706           3,169,153                                   Subtotal

     Uang muka                                                                                              Advances
      Proyek                                     248,468             27,829                                Projects
      Pembelian barang                           496,190            586,479                       Purchase of goods
      Pembelian bahan bakar                       77,807                816                        Purchases of fuel
      Lain-lain                                  455,758            418,989                                 Others

     Subjumlah                                 1,278,223           1,034,113                                   Subtotal

     Aset kontrak                                315,464            312,627                             Contract assets

     Jumlah                                    3,750,393           4,515,893                                      Total

     Dikurangi: bagian lancar                  3,535,274           4,269,422                     Less: current portion

     Bagian tidak lancar                         215,119            246,471                       Non-current portion


21. MODAL SAHAM DAN SALDO LABA                              21. CAPITAL STOCK AND RETAINED EARNINGS

    Modal saham                                                Capital stock

    Seluruh   saham     Perusahaan        dimiliki   oleh      The Company’s shares of stock are fully owned by the
    Pemerintah Republik Indonesia.                             Government of the Republic of Indonesia.

    Pada tanggal 30 Juni 2025 dan 31 Desember 2024,            As at June 30, 2025 and December 31, 2024, the
    Perusahaan mempunyai modal dasar masing-                   Company has authorised capital amounting to
    masing sebesar Rp439.000.000 yang terbagi atas             Rp439,000,000 consisting of 439,000,000 shares,
    439.000.000 saham dengan nilai nominal Rp1 per             with par value of Rp1 per share.
    saham.

    Berdasarkan surat Menteri BUMN No. S-                      Based on letter of the Minister of SOE No. S-
    106MBU/02/2022 tanggal 14 Februari 2022,                   106/MBU/02/2022 dated February 14, 2022 the
    pernyataan Keputusan Menteri BUMN sebagai                  decision of the Minister of SOE as the GMS approved
    RUPS menyetujui penambahan penyertaan modal                additional Government equity participation of
    Negara sebesar 10.075.210 saham dengan nilai               10,075,210 shares for a value of Rp10,075,210,
    Rp10.075.210 sehingga meningkatkan modal                   thereby increasing the subscribed and paid-up capital
    ditempatkan dan disetor menjadi Rp145.536.096.             to Rp145,536,096. Following the approval of the
    Atas persetujuan Penyertaan Modal Negara                   Government Participation, the stock subscription from
    tersebut, maka penyertaan modal Negara dalam               the Government in the issuance process (Note 22b)
    proses      penerbitan    saham    (Catatan    22b)        has therefore been reclassified to subscribed and
    direklasifikasi ke modal ditempatkan dan disetor.          paid-in capital.

    Berdasarkan Akta Notaris Muhammad Hanafi, S.H.,            Based on the Notarial Deed of Notary Muhammad
    tanggal 19 September 2023 No. 37 mengesahkan               Hanafi, S.H., dated September 19, 2023 No. 37 had
    penambahan penyertaan modal negara sebesar                 authorised an increase in state capital participation of
    5.000.000 saham dengan nilai Rp5.000.000                   5,000,000 shares with a value of Rp5,000,000.
    sehingga meningkatkan modal ditempatkan dan                Thereby increasing the issued and paid-up capital to
    disetor menjadi Rp150.536.096. Atas persetujuan            Rp150,536,096. Upon approval of state capital
    penyertaan modal negara tersebut, maka saldo               participation, the balance of state capital participation
    penyertaan modal negara dalam proses penerbitan            in the share issuance process (Note 22b) is
    saham (Catatan 22b) direklasifikasi ke modal               reclassified to issued and paid-up capital.
    ditempatkan dan disetor.
Page 103
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                               Lampiran 5/93 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                     NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                            FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                       JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)   (Expressed in millions of Rupiah, unless otherwise stated)

21. MODAL SAHAM DAN SALDO LABA (lanjutan)                   21. CAPITAL STOCK AND RETAINED EARNINGS
                                                                (continued)
    Saldo laba                                                 Retained earnings

    Saldo laba terdiri dari sebagai berikut:                   Retained earnings consist of the following:

    i. Saldo laba yang ditentukan penggunaannya                i.    Appropriated retained earnings

        Berdasarkan    Undang-Undang        Perseroan                Under Indonesian Limited Company Law, the
        Terbatas, Perusahaan diharuskan untuk                        Company is required to establish a statutory
        membuat penyisihan cadangan wajib hingga                     reserve amounting to at least 20% of the
        sekurang-kurangnya 20% dari jumlah modal                     Company’s subscribed and paid-up capital.
        yang ditempatkan dan disetor penuh.
       Berdasarkan berita acara RUPS tahun 2024                      Based on GMS for the year 2024 No.34 dated
       No.34 pada tanggal 18 Juni 2025, terdapat saldo               June 18, 2025, an appropriation from the 2024
       laba tahun 2024 yang ditetapkan sebagai                       retained     earnings       amounted        to
       cadangan umum sebesar Rp14.353.675.                           Rp14,353,675 was approved.

        Berdasarkan       RUPS       tahun      2023                 Based on GMS for the year 2023
        No.0152.K/DIR/2024 pada tanggal 22 Juli 2024,                No.0152.K/DIR/2024 dated July 22, 2024, an
        saldo laba tahun 2022 sebesar Rp18.935.591                   appropriation from the 2022 retained earnings
        ditetapkan sebagai cadangan umum.                            amounting to Rp18,935,591 was approved.

        Berdasarkan        RUPS       tahun       2022               Based on GMS for the year 2022
        No.0164.K/DIR/2023 pada tanggal 7 Juni 2023,                 No.0164.K/DIR/2023 dated June 7, 2023, an
        terdapat saldo laba tahun 2022 yang ditetapkan               appropriation from the 2022 retained earnings
        sebagai      cadangan       umum       sebesar               amounting to Rp12,146,040 was approved.
        Rp12.146.040.

    ii. Saldo   laba  yang          belum      ditentukan      ii.   Unappropriated retained earnings
        penggunaannya
       Pada tanggal 30 Juni 2025 dan 31 Desember                     As at June 30, 2025 and December 31, 2024, the
       2024, saldo laba yang belum ditentukan                        balance of the unappropriated retained earnings
       penggunaannya     masing-masing    sebesar                    amounting      to    Rp92,698,881           and
       Rp92.698.881 dan Rp103.765.084.                               Rp103,765,084, respectively.

    Dividen                                                    Dividends
    Berdasarkan Berita Acara RUPS No. 34 tanggal 18            Based on the minutes of GMS No. 34 dated June 18,
    Juni 2025,       pemegang saham menyutujui                 2025, the shareholders agreed to distribute cash
    pembagian dividen tunai final untuk tahun 2024             dividends from 2024 net income amounting to
    sejumlah Rp3.351.352 (dividen per saham                    Rp3,351,352 (dividend per share Rp22,263). The
    Rp22.263). Dividen tunai final tahun 2024 telah            cash dividends for 2024 were paid on July 14, 2025.
    dibayarkan pada tanggal 14 Juli 2025.

    Berdasarkan hasil keputusan RUPS tahun 2023                Based on the decision of the GMS for the year 2023
    0152.K/DIR/2024 yang diadakan pada tanggal 22              0152.K/DIR/2024 on July 22, 2024, the shareholders
    Juli 2024, pemegang saham menyetujui pembagian             agreed to distribute cash dividends from 2023 net
    dividen tunai final untuk tahun 2023 sejumlah              income amounting to Rp3,090,004 (dividend per
    Rp3.090.004 (dividen per saham Rp20.527 (nilai             share Rp20,527 (full amount)). The cash dividends for
    penuh)). Dividen tunai final tahun 2023 telah              2023 were paid on December 31, 2024.
    dibayarkan pada tanggal 31 Desember 2024.
Page 104
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                      Lampiran 5/94 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                       FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                  JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)              (Expressed in millions of Rupiah, unless otherwise stated)

22. TAMBAHAN    MODAL     DISETOR DAN                                  22. ADDITIONAL PAID-IN CAPITAL AND STOCK
    PENYERTAAN MODAL NEGARA DALAM                                          SUBSCRIPTION FROM GOVERNMENT IN
    PROSES PENERBITAN SAHAM                                                ISSUANCE PROCESS

    a.    Tambahan modal disetor                                           a.    Additional paid-in capital

          Tambahan modal disetor pada tanggal 30 Juni                            Additional paid-in capital as at June 30, 2025
          2025 terdiri dari selisih nilai transaksi                              consists of the difference in restructuring
          restrukturisasi entitas sepengendali dan aset                          transactions between entities under common
          yang     dibukukan     dan   sebagai    akibat                         control and the assets booked as a result of the
          keikutsertaan         Perusahaan       dalam                           Company’s participation in the tax amnesty
          pengampunan pajak, dengan rincian sebagai                              program with the following details:
          berikut:

                                                          30 Juni/              31 Desember/
                                                          June 30,              December 31,
                                                            2025                    2024

            Selisih nilai transaksi restrukturisasi          (106,753)               (106,753)               Difference in restructuring
             entitas sepengendali                                                                                          transactions

            Aset pengampunan pajak                            141,361                 141,361                      Tax amnesty assets

            Jumlah                                             34,608                  34,608                                     Total


    b. Penyertaan modal negara dalam proses                               b.    Stock subscription from Government in
       penerbitan saham                                                         issuance process
          Berdasarkan Peraturan Pemerintah Republik                             Based on Government Regulation No. 27 year 2022,
          Indonesia No. 27 tahun 2022, tanggal 31 Agustus                       dated August 31, 2022, the additions of stock
          2022, penambahan penyertaan modal negara                              subscription from the Government in cash which is
          secara tunai yang masih dalam proses penerbitan                       still in the issuance process amounting to
          saham adalah sebesar Rp5.000.000. Pada tahun                          Rp5,000,000. In 2023, stock subscription from the
          2023, penyertaan modal negara dalam proses                            Government in the issuance process amounting to
          penerbitan saham sebesar Rp5.000.000 telah                            Rp5,000,000 has been reclassified to share capital
          direklasifikasi sebagai modal saham (lihat Catatan                    (see Note 21).
          21).


23. PENDAPATAN DITANGGUHKAN                                            23. DEFERRED REVENUE


                                                        30 Juni/           31 Desember/
                                                        June 30,           December 31,
                                                          2025                 2024

     Saldo awal                                          36,509,498             28,686,927                            Beginning balance
     Penambahan                                           4,781,110              9,568,575                                    Additions
     Diakui sebagai pendapatan                                                                                  Recognised as revenue
         periode berjalan                                (1,056,109)            (1,746,004)                          during the period

     Saldo akhir                                         40,234,499             36,509,498                             Ending balance
     Uang Muka Penjualan Tenaga Listrik                   1,784,777              1,789,264       Advances received on sale of electricity

     Jumlah                                              42,019,276             38,298,762                                          Total

     Dikurangi: bagian jangka pendek                      4,084,203              3,849,635                       Less: current portion

     Bagian jangka panjang                               37,935,073             34,449,127                           Long-term portion
Page 105
                        PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                     DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                          Lampiran 5/95 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                     NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                            FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                       JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                   (Expressed in millions of Rupiah, unless otherwise stated)

23.     PENDAPATAN DITANGGUHKAN (lanjutan)                                  23. DEFERRED REVENUE (continued)

        Biaya penyambungan diamortisasi sejak tanggal                            Connection fees are amortised starting from the
        penyambungan berdasarkan rata-rata masa                                  connection date based on the average useful life of
        manfaat aset distribusi.                                                 the distribution of assets.

        Pada tahun 2024, Manajemen melakukan                                     In 2024, Management reclassified the presentation of
        reklasifikasi atas penyajian uang muka penjualan                         advances received for sales of electricity, with a
        tenaga listrik, dengan nilai 2024 sebesar                                value of 2024 of Rp1,789,264 (June, 2025 :
        Rp1.789.264 (Juni 2025: Rp1.784.777) yang                                Rp1.784.777) which was previously presented in
        sebelumnya disajikan pada utang lain-lain (lihat                         other payables (see Note 31).
        Catatan 31).


24. PENERUSAN PINJAMAN                                                     24. TWO-STEP LOANS

       Akun ini merupakan pinjaman luar negeri Pemerintah                       This account represents overseas, collateral-free loans of
       Republik Indonesia yang tidak diikat jaminan dan                         the Government of the Republic of Indonesia which are
       diteruskan kepada Perusahaan untuk membiayai                             passed on to the Company to finance its projects. The
       proyek-proyek Perusahaan. Rincian penerusan                              details of the two-step loans are as follows:
       pinjaman adalah sebagai berikut:


                                                                                 30 Juni/               31 Desember/             Periode/
                                                                                 June 30,               December 31,             Period *)
                                                                                   2025                     2024                Tahun/Year
       International Bank for Reconstruction
             and Development (IBRD)
             USD
             IBRD - 7940 IND - 1238                                                         2,073,225           2,147,732       2011 - 2034
             IBRD 8280 ID - 1256                                                            1,260,739           1,309,807       2014 - 2034
             IBRD - 8057 IND - 1244                                                           443,562             457,351       2012 - 2035
             IBRD - 7905 IND - 1235                                                           212,826             220,475       2010 - 2034
             IBRD 9278-1290                                                                    60,594              31,244       2022 - 2027
       Asian Development Bank (ADB)
             USD
             ADB - 1982 INO - 1170                                                           660,345             770,713        2004 - 2027
             ADB - 1983 INO - 1171                                                           448,520             523,484        2004 - 2027
             ADB 3015 INO - 1255                                                             478,183             499,965        2014 - 2033
             ADB - 2619 INO - 1236                                                           463,211             474,380        2010 - 2035
             ADB 3083 INO - 1257                                                             185,497             193,285        2014 - 2033
             ADB 8276 INO - 1258                                                              20,536              21,399        2014 - 2033
       Kreditanstalt Fur Wiederaufbau, Jerman (KFW)
             EUR
             KFW F 26180 - 1262                                                              115,239             114,596        2017 - 2029
       Japan Bank for International Cooperation (JBIC)
       (d/h The Export-Import Bank of Japan)
             JPY
             JICA IP 515 - 1177                                                             2,798,145           2,712,680       2004 - 2034
             JICA IP 512 - 1163                                                             2,528,474           2,458,834       2004 - 2033
             JICA IP 532 - 1214                                                             2,668,207           2,509,023       2006 - 2048
             JICA IP 538 - 1221                                                             2,105,012           1,977,251       2009 - 2047
             JICA IP 525 - 1197                                                             1,186,587           1,117,045       2005 - 2045
             JICA IP 513 - 1164                                                               771,682             750,429       2004 - 2033
             JICA IP 527 - 1211                                                               690,868             658,920       2007 - 2037
             JICA IP 539 - 1222                                                               662,292             633,615       2009 - 2037
             JICA IP 517 - 1178                                                               339,140             319,674       2004 - 2044
             JICA IP 560 - 1253                                                               378,697             354,019       2013 - 2053
             JICA IP 555 - 1231                                                                98,485              91,053       2013 - 2039
             JICA IP 561 - 1252                                                                64,684              60,469       2013 - 2053
             JICA IP 526 - 1198                                                                50,023              47,091       2005 - 2045
             JICA IP 516 - 1196                                                                39,169              36,920       2004 - 2044
             JICA IP 572 - 1265                                                                46,728              42,916       2016 - 2055
             JICA IP 537 - 1220                                                                 4,489               4,295       2009 - 2037
       Kingdom of Belgium / Kerajaan Belgia
             EUR
             Kerajaan Belgia/ Kingdom of Belgium - 1185                                       19,348              17,102        2005 - 2033
                                                                                                                       --
       China Exim Bank
            USD
            China Exim Bank 1261                                                            2,565,744           2,809,451       2015 - 2029
            China Exim Bank 1260                                                            1,682,102           1,860,481       2015 - 2029
            China Exim Bank 1248                                                              495,662             575,636       2013 - 2027



      *) Termasuk masa tenggang pembayaran/Include grace periods in terms of payments
Page 106
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                       Lampiran 5/96 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                  NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                         FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                    JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                (Expressed in millions of Rupiah, unless otherwise stated)

24. PENERUSAN PINJAMAN (lanjutan)                                        24. TWO-STEP LOANS (continued)

                                                                              30 Juni/               31 Desember/         Periode/
                                                                              June 30,               December 31,         Period *)
                                                                                2025                     2024            Tahun/Year
    Agence Francaise de Developpement
         USD
         AFD CID 1024 01B - 1254                                                        175,648               203,989    2013 - 2028
         AFD CID 1019 01F - 1237                                                               0                10,702   2010 - 2035
         AFD CID 1039 01H - 1259                                                          46,167                53,616   2014 - 2026
    Jumlah                                                                           25,839,829            26,069,641               -
    Biaya transaksi belum diamortisasi                                                  (45,421)              (32,701)
    Jumlah bersih                                                                    25,794,408            26,036,940
    Dikurangi bagian jatuh tempo dalam satu tahun
    International Bank for Reconstruction
          and Development (IBRD)
          USD
          IBRD - 7940 IND - 1238                                                          174,911             169,976    2011 - 2034
          IBRD 8280 ID - 1256                                                             114,239             110,995    2014 - 2034
          IBRD - 8057 IND - 1244                                                           32,997              32,030    2012 - 2035
          IBRD - 7905 IND - 1235                                                           17,956              17,450    2010 - 2034
    Asian Development Bank (ADB)
          USD
          ADB - 1982 INO - 1170                                                           245,076             232,491    2004 - 2027
          ADB - 1983 INO - 1171                                                           166,461             157,913    2004 - 2027
          ADB 3015 INO - 1255                                                              49,964              48,523    2014 - 2033
          ADB - 2619 INO - 1236                                                            28,718              27,226    2010 - 2035
          ADB 3083 INO - 1257                                                              18,003              17,484    2014 - 2033
          ADB 8276 INO - 1258                                                               1,993               1,936    2014 - 2033
    Kreditanstalt Fur Wiederaufbau, Jerman (KFW)
          EUR
          KFW F 26180 - 1262                                                               28,810              25,466    2017 - 2027
    Japan Bank for International Cooperation
    (d/h The Export-Import Bank of Japan)
          JPY
          JICA IP 515 - 1177                                                              310,905             285,545    2004 - 2034
          JICA IP 512 - 1163                                                              297,467             273,204    2004 - 2033
          JICA IP 538 - 1221                                                               95,682              87,878    2009 - 2047
          JICA IP 513 - 1164                                                               90,786              83,381    2004 - 2033
          JICA IP 525 - 1197                                                               59,329              54,490    2005 - 2045
          JICA IP 539 - 1222                                                               55,191              50,689    2009 - 2037
          JICA IP 527 - 1211                                                               53,144              48,809    2007 - 2037
          JICA IP 555 - 1231                                                                1,310               1,203    2013 - 2039
          JICA IP 517 - 1178                                                               17,849              16,394    2004 - 2044
          JICA IP 526 - 1198                                                                2,501               2,297    2005 - 2045
          JICA IP 516 - 1196                                                                2,062               1,893    2004 - 2044
          JICA IP 537 - 1220                                                                  374                 344    2009 - 2037
          JICA IP 532 - 1214                                                              127,293             116,910    2006 - 2048
          JICA IP 560 - 1253                                                               13,525              12,422    2013 - 2053
          JICA IP 561 - 1252                                                                2,310               2,122    2013 - 2053
          JICA IP 572 - 1265                                                                2,429               1,117    2016 - 2055
    Kingdom of Belgium / Kerajaan Belgia
          EUR
          Kerajaan Belgia/ Kingdom of Belgium - 1185                                        2,150               1,900    2005 - 2033
    China Exim Bank
          USD
          China Exim Bank - 1261                                                          513,149             510,809    2015 - 2029
          China Exim Bank - 1260                                                          373,800             372,096    2015 - 2029
          China Exim Bank - 1248                                                          165,221             164,467    2013 - 2027
    Agence Francaise de Developpement
          USD
          AFD CID 1024 01B - 1254                                                          58,549              58,282    2013 - 2028
          AFD CID 1019 01F - 1237                                                               0              10,702    2010 - 2035
          AFD CID 1039 01H - 1259                                                          15,389              15,319    2014 - 2026
                                                                                                                    --
    Jumlah bagian jatuh tempo
        dalam satu tahun                                                                 3,139,546          3,013,763

    Bagian jangka panjang                                                            22,654,862            23,023,177




   *) Termasuk masa tenggang pembayaran/Include grace periods in terms of payments
Page 107
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                  Lampiran 5/97 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                              NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                     FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)            (Expressed in millions of Rupiah, unless otherwise stated)

24. PENERUSAN PINJAMAN (lanjutan)                                   24. TWO-STEP LOANS (continued)
                                               30 Juni/                         31 Desember/
                                               June 30,                         December 31,
                                                 2025                               2024
    Tingkat suku bunga per tahun                                                                        Interest rate per annum
      USD                                         3.35% - 6.65%                 2.88% – 7.71%                          USD
      JPY                                         0.01% - 2.15%                 0.01% - 2.15%                          JPY
      EUR                                         0.35% - 2.35%                 0.35% - 2.35%                          EUR


    Perusahaan melakukan pembayaran pokok dan                             The Company made payments of principal and
    bunga penerusan pinjaman sesuai dengan jadwal                         interest on the two-step loans in accordance with the
    pembayaran dalam perjanjian penerusan pinjaman                        schedule of payment within the agreements of the
    yang berlaku pada tanggal laporan.                                    two-step loans as at the reporting date.

    Rincian saldo penerusan pinjaman berdasarkan                          Details of the two-step loans balance in currency are
    mata uang adalah sebagai berikut:                                     as follows:

                                     30 Juni/June 30, 2025                        31 Desember/December 31,2024
                             Dalam mata                                          Dalam mata
                            uang original/                                      uang original/
                              In original          Ekuivalen Rp/                  In original       Ekuivalen Rp/
                            currencies *)          Rp equivalent                currencies *)       Rp equivalent

    USD                        694,508,053             11,272,560                   752,844,441         12,163,708             USD
    JPY                    128,161,088,095             14,432,681               133,177,040,109         13,774,235             JPY
    EUR                          7,071,712                134,587                     7,828,598            131,698             EUR

    Jumlah                                             25,839,828                                       26,069,641            Total

    *)      Dalam jumlah penuh                                             *)    In full amount

25. UTANG KEPADA PEMERINTAH DAN LEMBAGA                             25.    GOVERNMENT AND NON-BANK GOVERNMENT
    KEUANGAN PEMERINTAH NON-BANK                                           FINANCIAL INSTITUTION LOANS


                                                     30 Juni/              31 Desember/
                                                     June 30,              December 31,
                                                       2025                    2024

     Utang Dividen (jangka pendek)                     3,351,352                             -          Divident Payables (current)

     PT Sarana Multi Infrastruktur                     2,459,947                  2,842,807           PT Sarana Multi Infrastruktur
     Dikurangi: bagian jatuh tempo dalam
       satu tahun                                         750,000                   750,000                 Less: current portion

     Bagian jangka panjang                             1,709,947                  2,092,807                    Long-term portion

         Tingkat suku bunga per tahun                                                                    Interest rate per annum
           Rupiah                                 5.25% - 6.67%                   5.25% - 6.67%                         Rupiah

    PT Sarana Multi Infrastruktur                                          PT Sarana Multi Infrastruktur

                                                     30 Juni/              31 Desember/
                                                     June 30,              December 31,
                                                       2025                    2024

     Pokok pinjaman                                    2,480,066                  2,855,066                              Principal
     Biaya transaksi yang belum diamortisasi             (13,768)                    (1,150)          Unamortized transaction cost
     Perbedaan nilai wajar                                (6,351)                   (11,109)                 Fair value difference

     Jumlah                                            2,459,947                  2,842,807                                  Total
Page 108
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/98 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                               FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                          JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)      (Expressed in millions of Rupiah, unless otherwise stated)


25. UTANG KEPADA PEMERINTAH DAN LEMBAGA                        25. GOVERNMENT AND NON-BANK GOVERNMENT
    KEUANGAN PEMERINTAH NON-BANK (lanjutan)                        FINANCIAL INSTITUTION LOANS (continued)

    Pada tanggal 23 Desember 2015, telah                          On December 23, 2015, Government Investment
    dilaksanakan     penandatanganan       perjanjian             Center and PT Sarana Multi Infrastruktur (“SMI”)
    pengalihan antara Pusat Investasi Pemerintah dan              signed a novation agreement which transfers all
    PT Sarana Multi Infrastruktur (“SMI”) yang                    current and future rights and obligations of
    mengalihkan seluruh hak dan kewajiban Pusat                   Government Investment Center to SMI, including
    Investasi Pemerintah kepada SMI pada saat ini                 interest and responsibilities in the Company’s
    maupun pada masa yang akan datang yang meliputi               investment agreement.
    kepentingan dan tanggung jawab dalam perjanjian
    investasi Perusahaan.

    Pada tanggal 29 Desember 2023, telah                          On December 29, 2023, the signing of Credit
    dilaksanakan penandatanganan Perjanjian Kredit                Agreement No. 22 and Facility Agreement Based on
    No. 22 dan Perjanjian Fasilitas Berdasarkan Prinsip           Musyarakah Principle No. 21 with SMI was carried
    Musyarakah No. 21 dengan SMI. Selama tahun                    out. During 2025, the Group made a withdrawal of
    2025, Grup melakukan penarikan pinjaman                       these non-bank government financial institution loans
    lembaga keuangan pemerintah non-bank tersebut                 amounting to RpNil (December 2024: Rp1,355,066).
    sebesar RpNihil (Desember 2024: Rp1.355.066).


    Sehubungan dengan fasilitas pinjaman tersebut                 In relation to this loan facility, the Company has
    Perusahaan telah memenuhi batasan-batasan yang                complied with the covenants in this agreement.
    diwajibkan dalam perjanjian tersebut.

    Saldo pinjaman yang terutang dari utang kepada                The outstanding balance of this non-bank
    Lembaga Keuangan Pemerintah non-bank ini                      Government Financial Institution Loans is repayable
    dibayarkan dengan jadwal pembayaran sebagai                   according to the following schedule:
    berikut:

                                                 30 Juni/           31 Desember/
                                                 June 30,           December 31,
                                                   2025                 2024
     Dibayarkan:                                                                                                Payable to:
      Dalam satu tahun                              750,000                750,000                         Within one year
      Pada tahun kedua                              375,000                750,000                     In the second year
      Pada tahun ketiga                                   --                     --                        In the third year
       Pada tahun keempat                             33,876                     --                      In the fourth year
       Pada tahun kelima                           1,321,190             1,355,066                       In the fifthh year

     Jumlah                                        2,480,066             2,855,066                                    Total

    Perusahaan melakukan pembayaran pokok dan                     The Company made payments of principal and
    bunga utang kepada Pemerintah sesuai dengan                   interest on Government loans in accordance with the
    jadwal pembayaran dan memenuhi pembatasan -                   schedule of payments and complied with the
    pembatasan dalam perjanjian utang kepada                      restrictions specified within the agreements of
    Pemerintah yang berlaku pada tanggal laporan.                 Government loans as at the reporting date.

    Lihat Catatan 51 untuk informasi rincian transaksi            Refer to Note 51 for information on the details of
    dan saldo dengan pihak berelasi.                              transactions and balances with related parties.
Page 109
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/99 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                          NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                 FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                            JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)        (Expressed in millions of Rupiah, unless otherwise stated)

26. UTANG SEWA                                                  26. LEASE LIABILITIES

    Akun ini terdiri dari utang Perusahaan kepada                   This account represents the Company’s liabilities to
    PT Central Java Power (“CJP”) dalam rangka                      PT Central Java Power (“CJP”) in relation to the
    Perjanjian Sewa Pembiayaan atas pengadaan                       Financial Lease Agreement on the acquisition of
    pembangkitan tenaga listrik 4x660MW Tanjung Jati                4x660MW Tanjung Jati B Units A, B, C, D, and several
    B Unit A, B, C, D, dan beberapa kontrak sewa                    lease contracts in relation to the leases of the gas
    sehubungan dengan sewa kompresor gas di                         compressors at the various locations.
    berbagai daerah.

    Nilai kini pembayaran minimum atas utang sewa                   The present value of minimum lease payments for
    tersebut pada tanggal 30 Juni 2025 dan 31                       such lease liabilities as at June 30, 2025 and
    Desember 2024 adalah sebagai berikut:                           December 31, 2024 is as follows:

    Berdasarkan jatuh tempo                                         By due date


                                                 30 Juni/                31 Desember/
                                                 June 30,                December 31,
                                                   2025                      2024

     Pembayaran jatuh tempo dalam waktu:                                                        Minimum lease payments due:
      Tidak lebih dari satu tahun                  3,044,881                  3,597,203                Not later than one year
      Antara lebih dari satu tahun sampai                                                   Later than one year and not later
        tiga tahun                                 6,876,732                  5,941,077                         three years
       Antara lebih dari tiga tahun sampai                                                 Later than three year and not later
         lima tahun                                4,439,209                  4,594,047                       than five years
       Lebih dari lima tahun tahun                 4,060,642                  4,944,166                 Later than five years

      Jumlah                                      18,421,464                19,076,493                                     Total
     Dikurangi: bunga                             (6,030,451)               (6,180,580)                           Less: interest


     Nilai kini pembayaran sewa masa datang       12,391,013                12,895,913         Present value of future minimum

     Dikurangi : bagian jatuh tempo dalam                                                               Less : current portion
      satu tahun                                   2,497,089                  2,880,568


     Bagian jangka panjang                         9,893,924                10,015,345                      Long term portion
Page 110
                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/100 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                            NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                   FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                              JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)          (Expressed in millions of Rupiah, unless otherwise stated)


26. UTANG SEWA (lanjutan)                                          26. LEASE LIABILITIES (continued)

    Berdasarkan pemberi sewa                                          By lessor

                                                 30 Juni/               31 Desember/
                                                 June 30,               December 31,
                                                   2025                     2024

      Pihak berelasi                                                                                             Related parties

        Pelabuhan Indonesia (Persero)                  1,296,360              1,157,553          Pelabuhan Indonesia (Persero)
        Dana Pensiun PLN - Rupiah                        817,615                889,744            Dana Pensiun PLN - Rupiah
        Lain-lain                                        186,089                460,960                                Others
        Subjumlah                                      2,300,064              2,508,257                               Subtotal

      Pihak ketiga                                                                                               Third parties
        PT Sulawesi Regas Satu                         1,465,829                301,527               PT Sulawesi Regas Satu
        PT State Grid Power Indonesia                  1,326,446                  1,139          PT State Grid Power Indonesia
        PT Central Java Power                          1,181,291              1,155,827                                   CJP
        PT Perta Daya Gas                                777,053                      -                    PT Perta Daya Gas
        PT Lumoso Pratama Lines                          495,083                  1,486                            PT Lumoso
        PT Gas Benoa Terminal                            418,917                511,638                PT Gas Benoa Terminal
        PT Batam Trans Gasindo                           360,623                417,063               PT Batam Trans Gasindo
        PT Prima Maritim Bahari                          342,406                  2,014               PT Prima Maritim Bahari
        PT Indah Bima Prima                              345,468                 35,385                   PT Indah Bima Prima
        PT Sumber Petrindo Perkasa                       272,586              1,383,824           PT Sumber Petrindo Perkasa
        Lain-lain                                      3,105,246              6,577,754                                 Others

        Subjumlah                                     10,090,949             10,387,656                                Subtotal

      Jumlah                                          12,391,013             12,895,913                                    Total

      Dikurangi: bagian jatuh tempo dalam              2,497,089              2,880,568                 Less : current portion
        satu tahun

      Bagian jangka panjang                            9,893,924             10,015,345                      Long term portion

                                                                                                              Interest rate per annum
    Tingkat suku bunga per tahun
      Rupiah                                  6.33% - 10.22%                  6.06 - 27.67%                             Rupiah
      USD                                         13.19%                         13.19%                                  USD
      JPY                                     7.57% - 11.02%                 7.57% - 18.10%                              JPY


    Rincian utang sewa menurut mata uang adalah                       Details of the lease liabilities by currency are as
    sebagai berikut:                                                  follows:
                                   30 Juni/June 30, 2025                      31 Desember/December 31,2024
                           Dalam mata                                        Dalam mata
                          uang original/                                    uang original/
                            In original          Ekuivalen Rp/                In original       Ekuivalen Rp/
                          currencies *)          Rp equivalent              currencies *)       Rp equivalent

    Rupiah                     10,849,099            10,849,099                   11,323,024                  11,323,024      Rupiah
    USD                        22,218,152               360,623                   25,813,155                     417,063        USD
    JPY                    10,489,769,502             1,181,291               11,175,181,496                   1,155,826        JPY

    Jumlah                                           12,391,013                                               12,895,913           Total

    *) Dalam jumlah penuh, kecuali Rupiah                             *) In full amount, except for Rupiah

    Beban bunga dan keuangan terkait utang sewa                       Interest expense and financial charges related to
    pada tahun yang berakhir pada tanggal 30 Juni                     lease liabilities for the years ended June 30, 2025
    2025   dan    2024   masing-masing     sebesar                    and 2024, amounted to Rp3,230,969 and
    Rp3.230.969 dan Rp3.019.997 (Catatan 45).                         Rp3,019,997, respectively (Note 45).
Page 111
                     PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                  DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                            Lampiran 5/101 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                       FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                                  JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                              (Expressed in millions of Rupiah, unless otherwise stated)


27. UTANG BANK                                                                     27. BANK LOANS

                                                                   30 Juni/                31 Desember/
                                                                   June 30                 December 31
                                                                    2025                      2024

     Pinjaman terkait program percepatan                                                                                 Loans related fo fast track program

     Entitas yang berelasi dengan Pemerintah                                                                                   Government related entities :

     Agen:        BNI                                                                                                                            Agent : BNI
     Sindikasi:                                                                                                                                 Syndicated :
                  Entitas yang berelasi dengan Pemerintah                                                                    Government related entities :
                    BNI                                                       43,749                87,499                                       BNI
                    BRI                                                       43,749                87,499                                       BRI
                    Bank Mandiri                                              43,749                87,499                             Bank Mandiri
                    Lembaga Pembiayaan Ekspor Indonesia ("LPEI")              43,749                87,498                                      LPEI
     Subjumlah                                                           174,997                   349,995                                           Subtotal

     Agen:        Bank DKI                                                                                                                 Agent : Bank DKI
     Sindikasi:                                                                                                                                 Syndicated:
                  Entitas yang berelasi dengan Pemerintah                                                                    Government related entities :
                    Bank DKI                                                  41,071               123,214                                 Bank DKI
                    SMI                                                       14,286                42,858                                       SMI
                    Bank Jateng                                                7,143                21,429                             Bank Jateng
                    BPD Aceh                                                   3,571                10,714                               BPD Aceh
                    Bank Kalteng                                               3,571                10,714                            Bank Kalteng
                    Bank Riau                                                  3,571                10,714                               Bank Riau
                    Bank Kalbar                                                3,571                10,714                             Bank Kalbar
                    BPD Bali                                                   2,679                 8,036                                 BPD Bali
     Subjumlah                                                                79,464               238,393                                           Subtotal

     Jumlah Pinjaman terkait program percepatan                          254,462                   588,388          Total loans related fo fast track program

     Pinjaman tidak terkait program                                                                                  Loans not related fo fast track program
                  percepatan

     Entitas yang berelasi dengan Pemerintah                                                                                   Government related entities :

     Agen:        BNI                                                                                                                            Agent : BNI
     Sindikasi:                                                                                                                                 Syndicated :
                  Entitas yang berelasi dengan Pemerintah                                                                    Government related entities :
                    BNI                                                 1,299,568                1,443,964                                       BNI
                    BRI                                                   472,729                  525,255                                       BRI
                    Bank Mandiri                                        1,063,378                1,181,531                             Bank Mandiri
                  Pihak ketiga                                                  --                       --
     Subjumlah                                                          2,835,675                3,150,750                                           Subtotal

     Agen:        BRI                                                                                                                            Agent : BRI
     Sindikasi:                                                                                                                                 Syndicated :
                  Entitas yang berelasi dengan Pemerintah                                                                    Government related entities :
                    BRI                                                 3,803,803                4,459,603                                       BRI
                    BRI Agro                                                    --                       --                                 BRI Agro
                    Bank Mandiri                                        3,057,265                3,503,954                             Bank Mandiri
                    BNI                                                   878,693                1,003,954                                       BNI
                    SMI                                                   437,500                  526,785                                       SMI
                    BPD Papua                                             241,071                  273,214                               BPD Papua
                    LPEI                                                   35,714                   71,429                                      LPEI
                  Pihak ketiga                                          2,369,765                2,570,025                                 Third Parties
     Subjumlah                                                         10,823,811               12,408,964                                           Subtotal

     Agen:        Bank Mandiri                                                                                                        Agent : Bank Mandiri
     Sindikasi:                                                                                                                                 Syndicated :
                  Entitas yang berelasi dengan Pemerintah                                                                    Government related entities :
                    Bank Mandiri                                        4,160,650                4,221,960                             Bank Mandiri
                    BNI                                                 2,052,706                2,052,706                                       BNI
                    BTN                                                 2,000,000                2,000,000                                      BTN
                    SMI                                                   113,187                  150,916                                       SMI
                    BRI                                                    56,594                   75,458                                       BRI
                    LPEI                                                   28,297                   37,729                                      LPEI
                    BPD Papua                                                   --                       --                              BPD Papua
                    Bank BJB                                                    --                       --                                Bank BJB
                  Pihak ketiga                                          2,958,669                3,057,709                                 Third Parties
     Subjumlah                                                         11,370,104               11,596,478                                           Subtotal

     Agen:        BSI                                                                                                                            Agent : BSI
     Sindikasi:                                                                                                                                 Syndicated :
                  Entitas yang berelasi dengan Pemerintah                                                                    Government related entities :
                    BSI                                                 2,390,862                2,522,057                                       BSI
                  Pihak ketiga                                            393,091                  414,546                                 Third Parties
     Subjumlah                                                          2,783,954                2,936,603                                           Subtotal

     BTN                                                                 750,000                   857,143                                              BTN
Page 112
                         PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                      DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                   Lampiran 5/102 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                     NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                            FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                                       JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                   (Expressed in millions of Rupiah, unless otherwise stated)

27. UTANG BANK (lanjutan)                                                                  27. BANK LOANS (continued)

                                                                         30 Juni/              31 Desember/
                                                                         June 30               December 31
                                                                          2025                    2024

    Pinjaman tidak terkait program                                                                                                 Loans not related fo fast track program
                 percepatan

    Pihak Ketiga

    Agen:          BCA                                                                                                                                         Agent : BCA
    Sindikasi:                                                                                                                                                 Syndicated :
                   Entitas yang berelasi dengan Pemerintah                                                                                  Government related entities :
                     BNI                                                      3,950,068              3,950,068                                                  BNI
                     BRI                                                              --                     --                                                 BRI
                     Bank Mandiri                                             3,625,171              3,625,171                                        Bank Mandiri
                     BTN                                                      1,950,068              1,950,068                                                 BTN
                     BSI                                                      2,000,000              2,000,000                                                  BSI
                   Pihak ketiga                                              14,074,692             14,074,693                                            Third Parties
    Subjumlah                                                                25,600,000             25,600,000                                                       Subtotal

    Agen:          Bank CIMB Niaga                                                                                                                Agent : Bank CIMB Niaga
    Sindikasi:                                                                                                                                                 Syndicated :
                   Entitas yang berelasi dengan Pemerintah                                                                                  Government related entities :
                     SMI                                                        401,786                455,357                                                  SMI
                     BSI                                                         80,357                 91,071                                                  BSI
                   Pihak ketiga                                               4,142,857              4,328,572                                            Third Parties
    Subjumlah                                                                 4,625,000              4,875,000                                                       Subtotal

    Agen:          Bank DBS Indonesia                                                                                                           Agent : Bank DBS Indonesia
    Sindikasi:                                                                                                                                                Syndicated :
                   Entitas yang berelasi dengan Pemerintah                                                                                      Government related entities :
                     BTN                                                        259,696                323,140                                                     BTN
                   Pihak ketiga                                              20,840,604             24,720,210                                                Third Parties
    Subjumlah                                                                21,100,300             25,043,350                                                       Subtotal

    State Bank of India ("SBI")                                                 200,000                200,000                                     State Bank of India ("SBI")

    Bank Bukopin                                                                300,000                300,000                                                 Bank Bukopin

    Bank BCA Syariah ("BCA Syariah")                                            150,000                150,000                           Bank BCA Syariah ("BCA Syariah")

    Agen:          Bank Permata                                                                                                                     Agent : Bank Permata
    Sindikasi:                                                                                                                                                 Syndicated :
                   Pihak ketiga                                               2,481,854              2,481,854                                            Third Parties
                                                                                                                                            Government related entities :
    HSBC                                                                      1,694,819              1,796,415                                                        HSBC

    ADB                                                                      29,031,337             27,518,817                                                           ADB

    Asian Infrastructure Investment Bank ("AIIB")                             3,019,236              3,005,471                  Asian Infrastructure Investment Bank ("AIIB")

    Agen:          Credit Agricole CIB Paris                                                                                               Agent : Credit Agricole CIB Paris
    Sindikasi:                                                                                                                                                  Syndicated :
                   Pihak ketiga                                               2,226,573              2,374,736                                             Third Parties

    Agen:          Export Guarantee and Insurance Corporation ("EGAP")                                                  Agent : Export Guarantee and Insurance Corporation
    Sindikasi:                                                                                                                                                Syndicated :
                   Pihak ketiga                                                 126,563                137,440                                             Third Parties

    Agen:          Servizi Assicurativi del Commercio Estero ("SACE")                                             Agent : Servizi Assicurativi del Commercio Estero ("SACE")
    Sindikasi:                                                                                                                                                  Syndicated :
                   Pihak ketiga                                                 319,203                307,804                                               Third Parties

    Agen:          Korea Exim Bank ("KEXIM")                                                                                             Agent : Korea Exim Bank ("KEXIM")
    Sindikasi:                                                                                                                                                Syndicated :
                   Pihak ketiga                                                 528,184                573,574                                             Third Parties

    International Bank for Reconstruction and Development ("IBRD")            7,735,097              7,138,004
                                                                                                            International Bank for Reconstruction and Development ("IBRD")

    Islamic Development Bank ("IDB")                                          3,607,859              3,709,442                             Islamic Development Bank ("IDB")

    Agen:          Japan Bank for International Cooperation ("JBIC")                                                Agent : Japan Bank for International Cooperation ("JBIC")
    Sindikasi:                                                                                                                                                 Syndicated :
                   Pihak ketiga                                               7,276,658              7,552,659                                              Third Parties

    Agen:          MUFG Bank, Ltd. (“MUFG Bank”)                                                                                                    Agent : MUFG Bank, Ltd.
    Sindikasi:                                                                                                                                                 Syndicated :
                   Pihak ketiga                                                       --             1,023,936                                              Third Parties

    Agen:          Export Development Canada ("EDC")                                                                            Agent : Export Development Canada ("EDC")
    Sindikasi:                                                                                                                                                Syndicated :
                   Pihak ketiga                                               2,434,650              2,726,494                                             Third Parties

    Agen:          Sumitomo Mitsui Banking Corporation ("SMBC")                                                      Agent : Sumitomo Mitsui Banking Corporation ("SMBC")
    Sindikasi:                                                                                                                                               Syndicated :
                   Pihak ketiga                                                 751,588                810,508                                           Third Parties
Page 113
                        PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                     DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                 Lampiran 5/103 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                    NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                           FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                                      JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                  (Expressed in millions of Rupiah, unless otherwise stated)

27. UTANG BANK (lanjutan)                                                                 27. BANK LOANS (continued)
                                                                      30 Juni/               31 Desember/
                                                                      June 30                December 31
                                                                       2025                     2024

  Pinjaman tidak terkait program                                                                                                Loans not related fo fast track program
               percepatan

  Pihak Ketiga

  Agence Francaise De Development ("AFD")                                   889,934                  865,304                   Agence Francaise De Development ("AFD")

  Bank Gospodarstwa Krajowego ("BGK")                                       693,424                  669,586                      Bank Gospodarstwa Krajowego ("BGK")

  Agen:            BNP Paribas SA                                                                                                                 Agent : BNP Paribas SA
  Sindikasi:                                                                                                                                                Syndicated :
                 Pihak ketiga                                               987,468                  939,995

  Agen:          Standard Chartered Bank ("SCB")                                                                                 Agent : Standard Chartered Bank (“SCB”)
  Sindikasi:                                                                                                                                                Syndicated :
                 Pihak ketiga                                               616,914                  654,370                                             Third Parties

  KfW                                                                      5,717,532               5,170,253                        Kreditanstalt fur Wiederaufbau ("KfW")

  Mizuho Bank                                                               565,491                  562,336                                                 Mizuho Bank

  Jumlah Pinjaman yang tidak terkait program percepatan                 151,243,226              157,137,286               Total loans not related fo fast track program

  Jumlah                                                                151,497,687              157,725,674                                                         Total
  Biaya transaksi belum diamortisasi                                       (578,037)                (496,012)                                Unamortised transaction cost

  Jumlah bersih                                                         150,919,650              157,229,662                                                   Total, Net

  Dikurangi bagian jatuh tempo dalam satu tahun                                                                                                 Less : current maturities

  Pinjaman terkait program percepatan                                                                                                Loans related fo fast track program

  Entitas yang berelasi dengan Pemerintah                                                                                                  Government related entities :

  Agen:          BNI                                                                                                                                          Agent : BNI
  Sindikasi:                                                                                                                                                 Syndicated :
                 Entitas yang berelasi dengan Pemerintah                                                                                  Government related entities :
                   BNI                                                       43,749                   87,499                                                  BNI
                   BRI                                                       43,749                   87,499                                                  BRI
                   Bank Mandiri                                              43,749                   87,499                                        Bank Mandiri
                   LPEI                                                      43,749                   87,498                                                 LPEI
  Subjumlah                                                                 174,997                  349,995                                                      Subtotal

  Agen:          Bank DKI                                                                                                                               Agent : Bank DKI
  Sindikasi:                                                                                                                                                 Syndicated :
                 Entitas yang berelasi dengan Pemerintah                                                                                  Government related entities :
                   Bank DKI                                                      41,071              123,214                                            Bank DKI
                   SMI                                                           14,286               42,858                                                  SMI
                   Bank Jateng                                                    7,143               21,429                                        Bank Jateng
                   BPD Aceh                                                       3,571               10,714                                          BPD Aceh
                   Bank Kalteng                                                   3,571               10,714                                       Bank Kalteng
                   Bank Riau                                                      3,571               10,714                                          Bank Riau
                   Bank Kalbar                                                    3,571               10,714                                        Bank Kalbar
                   BPD Bali                                                       2,679                8,036                                            BPD Bali
  Subjumlah                                                                      79,464              238,393                                                     Subtotal

  Pihak Ketiga                                                                                                                                             Third Parties

  Agen:            Industrial and Commercial Bank of China ("ICBC")                                              Agent : Industrial and Commercial Bank of China ("ICBC")
  Sindikasi:                                                                                                                                                  Syndicated :
                 Pihak ketiga                                                       (0)                     --                                           Third Parties

  Jumlah Pinjaman terkait program percepatan                                254,462                  588,388                   Total loans related fo fast track program

  Pinjaman tidak terkait program                                                                                                Loans not related fo fast track program
               percepatan

  Entitas yang berelasi dengan Pemerintah                                                                                                  Government related entities :

  Agen:          BNI                                                                                                                                          Agent : BNI
  Sindikasi:                                                                                                                                                 Syndicated :
                 Entitas yang berelasi dengan Pemerintah                                                                                  Government related entities :
                   BNI                                                      288,793                  269,701                                                  BNI
                   BRI                                                      105,051                   98,106                                                  BRI
                   Bank Mandiri                                             236,306                  220,684                                        Bank Mandiri
                 Pihak ketiga                                                     --                       --                                           Third Parties
  Subjumlah                                                                 630,150                  588,491                                                     Subtotal
Page 114
                         PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                      DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                             Lampiran 5/104 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                              NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                     FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                                JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                            (Expressed in millions of Rupiah, unless otherwise stated)

27. UTANG BANK (lanjutan)                                                           27. BANK LOANS (continued)

                                                                30 Juni/                 31 Desember/
                                                                June 30                  December 31
                                                                 2025                       2024


    Pinjaman tidak terkait program                                                                                Loans not related fo fast track program
                 percepatan

    Entitas yang berelasi dengan Pemerintah                                                                                 Government related entities :


    Agen:          BRI                                                                                                                        Agent : BRI
    Sindikasi:                                                                                                                               Syndicated :
                   Entitas yang berelasi dengan Pemerintah                                                                Government related entities :
                     BRI                                             1,247,828                   941,834                                      BRI
                     BRI Agro                                                --                        --                                BRI Agro
                     Bank Mandiri                                      946,505                   630,280                            Bank Mandiri
                     BNI                                               339,362                   517,933                                      BNI
                     SMI                                               142,857                    79,101                                      SMI
                     LPEI                                               35,714                    71,429                                     LPEI
                     BPD Papua                                          64,286                     4,603                              BPD Papua
                   Pihak ketiga                                        632,219                   263,420                                Third Parties
    Subjumlah                                                        3,408,771                 2,508,600                                          Subtotal

    Agen:          Bank Mandiri                                                                                                    Agent : Bank Mandiri
    Sindikasi:                                                                                                                               Syndicated :
                   Entitas yang berelasi dengan Pemerintah                                                                Government related entities :
                     Bank Mandiri                                     284,687                    122,620                            Bank Mandiri
                     SMI                                               75,458                     75,458                                      SMI
                     BNI                                               65,866                          --                                     BNI
                     BRI                                               37,729                     37,729                                      BRI
                     LPEI                                              18,865                     18,865                                     LPEI
                     BTN                                              100,000                          --                                    BTN
                   Pihak ketiga                                       310,145                    198,077                                Third Parties
    Subjumlah                                                         892,749                    452,749                                          Subtotal

    Agen:          BSI                                                                                                                        Agent : BSI
    Sindikasi:                                                                                                                               Syndicated :
                   Entitas yang berelasi dengan Pemerintah                                                                Government related entities :
                     BSI                                              271,928                    230,261                                      BSI
                   Pihak ketiga                                        45,988                     37,655                                Third Parties
    Subjumlah                                                         317,916                    267,916                                          Subtotal

    BTN                                                               214,286                    214,286                                              BTN

    Pihak Ketiga                                                                                                                            Third Parties

    Agen:          Bank CIMB Niaga                                                                                              Agent : Bank CIMB Niaga
    Sindikasi:                                                                                                                               Syndicated :
                   Entitas yang berelasi dengan Pemerintah                                                                Government related entities :
                     SMI                                               107,143                   107,143                                      SMI
                     BSI                                                21,429                    21,429                                       BSI
                   Pihak ketiga                                      1,371,429                 2,371,428                                 Third Parties
    Subjumlah                                                        1,500,000                 2,500,000                                          Subtotal

    HSBC                                                              289,320                    288,000                                            HSBC

    ADB                                                              1,602,084                 1,178,848                                              ADB

    AIIB                                                                   52,390                       --                                             AIIB

    Agen:          Credit Agricole CIB Paris                                                                              Agent : Credit Agricole CIB Paris
    Sindikasi:                                                                                                                                 Syndicated :
                   Pihak ketiga                                       318,082                    316,632                                   Third Parties

    Agen:          Bank DBS Indonesia                                                                                         Agent : Bank DBS Indonesia
    Sindikasi:                                                                                                                               Syndicated :
                     BTN                                               162,310                   129,256                                         BTN
                   Pihak ketiga                                      9,982,065                 7,949,244                                 Third Parties
    Subjumlah                                                       10,144,375                 8,078,500                                          Subtotal

    Agen:          EGAP                                                                                                                     Agent : EGAP
    Sindikasi:                                                                                                                                Syndicated :
                   Pihak ketiga                                            23,012                 22,906                                  Third Parties

    Agen:          SACE                                                                                                                     Agent : SACE
    Sindikasi:                                                                                                                                Syndicated :
                   Pihak ketiga                                            58,037                 51,301                                  Third Parties

    Agen:          KEXIM                                                                                                                    Agent : KEXIM
    Sindikasi:                                                                                                                                Syndicated :
                   Pihak ketiga                                            96,033                 95,596                                  Third Parties
Page 115
                          PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                       DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                            Lampiran 5/105 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                              NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                     FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                                JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                            (Expressed in millions of Rupiah, unless otherwise stated)

27. UTANG BANK (lanjutan)                                                           27. BANK LOANS (continued)


                                                                 30 Juni/                31 Desember/
                                                                 June 30                 December 31
                                                                  2025                      2024


    Pinjaman tidak terkait program                                                                                Loans not related fo fast track program
                 percepatan

    Pihak Ketiga                                                                                                                           Third Parties

    IBRD                                                                 484,158                 455,877                                            IBRD

    IDB                                                                  246,944                 239,286                                              IDB

    Agen:          JBIC                                                                                                                      Agent : JBIC
    Sindikasi:                                                                                                                               Syndicated :
                   Pihak ketiga                                         1,385,048              1,267,571                                 Third Parties

    Agen:          MUFG Bank                                                                                                     Agent : MUFG Bank, Ltd.
    Sindikasi:                                                                                                                               Syndicated :
                   Pihak ketiga                                                --              1,023,937                                 Third Parties

    Agen:          EDC                                                                                                                       Agent : EDC
    Sindikasi:                                                                                                                               Syndicated :
                   Pihak ketiga                                          608,662                 605,887                                 Third Parties

    Agen:          SMBC                                                                                                                    Agent : SMBC
    Sindikasi:                                                                                                                               Syndicated :
                   Pihak ketiga                                          125,265                 124,693                                 Third Parties

    AFD                                                                  177,987                  77,245                                             AFD

    BGK                                                                  128,173                 113,296                                             BGK

    Agen:          BNP Paribas SA                                                                                                 Agent : BNP Paribas SA
    Sindikasi:                                                                                                                                Syndicated :
                   Pihak ketiga                                          151,918                 134,285                                  Third Parties

    Agen:          SCB                                                                                                                       Agent : SCB
    Sindikasi:                                                                                                                               Syndicated :
                   Pihak ketiga                                          246,765                 218,123                                 Third Parties

    KfW                                                                  300,876                 247,884                                             KfW

    Mizuho Bank                                                          141,373                 124,964                                     Mizuho Bank

    Jumlah Pinjaman yang tidak terkait program percepatan              23,544,374             21,196,873          Loans not related fo fast track program

    Dikurangi : bagian jatuh tempo dalam satu tahun                    23,798,835             21,785,261                           Less: current portion

    Bagian jangka panjang                                             127,120,815            135,444,401                              Long-term portion




                                                        30 Juni/                               31 Desember/
                                                      June 30, 2025                            December 31,
                                                                                                   2024
    Tingkat suku bunga per tahun                                                                                           Interest rate per annum
      Rupiah                                          5.43% - 9.03%                            5.00% - 9.10%                                 Rupiah
      USD                                             2.56% - 7.17%                            2.56% - 7.05%                                   USD
      EUR                                             0.33% - 5.40%                            0.33% - 5.40%                                   EUR
      JPY                                             1.11% - 1.74%                            0.62% - 1.74%                                   JPY
Page 116
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                        Lampiran 5/106 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                       NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                              FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                         JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                     (Expressed in millions of Rupiah, unless otherwise stated)

27. UTANG BANK (lanjutan)                                                     27. BANK LOANS (continued)

    Pada tanggal 30 Juni 2025 dan 31 Desember 2024,                              As at June 30, 2025 and December 31, 2024, the
    rincian utang bank berdasarkan mata uang adalah                              details of bank loans by currency are as follows:
    sebagai berikut:

                                      30 Juni/June 30, 2025                           31 Desember/December 31,2024
                                Dalam mata                                            Dalam mata
                               uang original/                                        uang original/
                                 In original        Ekuivalen Rp/                      In original      Ekuivalen Rp/
                               currencies *)        Rp equivalent                    currencies *)      Rp equivalent

    Rupiah                         62,174,859                62,174,859                   65,145,180                     65,145,180               Rupiah
    USD                         2,809,390,456                45,599,216                3,125,990,713                     50,506,632                 USD
    EUR                         1,237,221,677                23,546,432                1,297,331,124                     21,824,612                 EUR
    JPY                       179,171,790,871                20,177,180              195,781,121,181                     20,249,250                 JPY

    Jumlah                                                 151,497,687                                               157,725,674                     Total
     *)    Dalam jumlah penuh, kecuali Rupiah                                   *)   In full amount, except for Rupiah

    Pinjaman terkait program percepatan                                          Loans related to fast track program

    Perusahaan memperoleh fasilitas pinjaman dari                                The Company obtained loan facilities from several
    beberapa bank untuk membiayai 85% dari nilai                                 banks to finance 85% of the value of EPC contracts
    kontrak EPC untuk program percepatan. Pinjaman                               for its fast track program. These loans are fully
    ini sepenuhnya dijamin oleh Pemerintah Republik                              guaranteed by the Government of the Republic of
    Indonesia sesuai dengan Perpres No. 91 Tahun                                 Indonesia in accordance with Perpres No. 91 Year
    2007, pengganti dari Perpres No. 86 Tahun 2006,                              2007, which superseded Perpres No. 86 Year 2006,
    tentang Pemberian Jaminan Pemerintah untuk                                   regarding the Grant of Government Guarantee for
    Percepatan Pembangunan Pembangkit Tenaga                                     Construction of a Coal-Fired Power Plant. In
    Listrik yang Menggunakan Batubara. Sehubungan                                connection with these loans, the Company is
    dengan pinjaman ini, Perusahaan dibatasi oleh                                restricted by general rules as described in the loan
    ketentuan-ketentuan       umum       sebagaimana                             agreements.
    ditetapkan dalam perjanjian pinjaman.

    Pada tanggal 30 Juni 2025 dan 31 Desember 2024,                              As at June 30, 2025 and December 31, 2024, the
    rincian fasilitas pinjaman tersebut adalah sebagai                           details of such loan facilities are as follows:
    berikut:


     No         Kreditur dan jenis          Mata      Fasilitas       Jumlah pinjaman/                  Pembayaran kembali/              Periode pinjaman/
                    pinjaman/              uang/     maksimum/      Outstanding balance *)                 Repayment *)                      Loan term
               Creditor and type of       Currency    Maximum
                       loan                           facility *)

                                                                       2025            2024            2025              2024


      1.     Pinjaman Sindikasi            Rupiah      2,225,000       79,464         238,393         158,929            317,857    12 November/November 2015-
             dikoordinasi/                                                                                                          12 November/November 2025
             Syndicated Loan
             coordinated by
               Bank DKI/
             PLTU Riau Tenayan

      2.     Pinjaman Sindikasi            Rupiah      2,449,963    174,997           349,995         174,997            349,995    17 Desember/December 2015-
             dikoordinasi/                                                                                                          16 Desember/December 2025
             Syndicated
             Loan
             coordinated by
               BNI/
             PLTU Kalimantan Timur
             /East Kalimantan
                                                                                                                                     *) In million original currency
     *) Dalam jutaan mata uang original
                                                            30 Juni/                          31 Desember/
                                                            June 30,                          December 31,
                                                              2025                                2024
    Tingkat suku bunga per tahun                                                                                                   Interest rate per annum
      Rupiah                                             7.64% - 8.42%                        8.12% - 8.68%                                          Rupiah
Page 117
                           PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                        DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                          Lampiran 5/107 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                         NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                                FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                                           JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                       (Expressed in millions of Rupiah, unless otherwise stated)

27. UTANG BANK (lanjutan)                                                                     27. BANK LOANS (continued)
    Pinjaman tidak terkait program percepatan                                                         Loans not related to fast track program
                                                                                                   Jumlah pinjaman/
                                                                           Fasilitas                                                 Pembayaran kembali/
                                                                                                 Pembayaran kembali/
                                                                                                 Outstanding balance*)
                                                                          maksimum/                                                      Repayment*)
                                                                                                       Repayment
                   Kreditur dan jenis pinjaman/              Mata uang/   Maximum              30 Jun/            31 Des/           30 Jun/        31 Des/              Periode pinjaman/
    No.              Creditor and type of loan               Currency     facility*)         Jun 30, 2025      Dec 31, 2024       Jun 30, 2025   Dec 31, 2024               Loan term

      1     Bank Mandiri
            - Pinjaman Perusahaan 2016/                       Rupiah          12,000,000           679,124           905,498           226,375          452,749   19 Desember/December 2016 -
              Corporate Loan 2016                                                                                                                                       23 November 2026
            - Pinjaman Perusahaan 2020/                       Rupiah           8,800,000         8,800,000         8,800,000                 -                -    4 Desember/December 2020
              Corporate Loan 2020                                                                                                                                       23 September 2030
            - Fasilitas Kredit Modal Kerja Bilateral 2022/    Rupiah             300,000                 -                    -              -                -          21 Juni/June 2024
              Bilateral Working Capital loan Facility 2022                                                                                                               21 Juni/June 2025
            - Pinjaman Perusahaan 2023/                       Rupiah           9,000,000         1,890,980         1,890,980                 -                -   29 Desember/December 2023 -
              Corporate Loan 2023                                                                                                                                 29 Desember/December 2033 -
            - Pinjaman Perusahaan 2025/                       Rupiah          15,000,000                 -                    -              -                -       25 Juni/25 June 2025 -
              Corporate Loan 2025                                                                                                                                      25 Juni/25 June 2035

      2     Bank Rakyat Indonesia ("BRI")
            - Kredit Modal Kerja 2011/                        Rupiah          20,000,000                 -                    -     20,000,000     37,210,417          21 Juni/June 2024
              Working Capital Loan 2011                                                                                                                                21 Juni/June 2025
            - Pinjaman Perusahaan 2015/                       Rupiah          12,000,000           857,143         1,714,286           857,143         1,714,286 17 Desember/December 2015 -
              Corporate Loan 2015                                                                                                                                 17 Desember/December 2025
            - Pinjaman Sindikasi 2018/                        Rupiah           4,504,344         2,868,454         2,650,036           331,254           658,771      14 November 2018 -
              Syndicated Loan 2018                                                                                                                                         14-Nov-28
            - Pinjaman Perusahaan 2019/                       Rupiah          13,250,000         7,098,214         8,044,643           946,429         1,892,857        23 April 2019 -
              Corporate Loan 2019                                                                                                                                        23 April 2029

      3     Bank Negara Indonesia ("BNI")
            - Pinjaman Perusahaan 2019/                       Rupiah           5,071,000         2,835,675         3,150,750           315,075          588,491   18 Desember/December 2019 -
              Corporate Loan 2019                                                                                                                                  18 Desember/December 2029
              Fasilitas Kredit Modal Kerja Bilateral 2022/                       108,607                 -                    -              -                -         30 Juni/June 2024
              Bilateral Working Capital loan Facility 2022                                                                                                              30 Juni/June 2025

      4     Bank Syariah Indonesia (BSI)
            - Pinjaman Perusahaan 2019/                       Rupiah           2,846,000         1,373,845         1,526,494           152,649          267,916   18 Desember/December 2019 -
              Corporate Loan 2019                                                                                                                                  18 Desember/December 2029
            - Pinjaman Perusahaan 2020/                       Rupiah           1,200,000         1,200,000         1,200,000                 -                -     4 Desember/December 2020
              Corporate Loan 2020                                                                                                                                       23 September 2030
            - Pinjaman Perusahaan 2023/                       Rupiah           1,000,000           210,109           210,109                 -                -   29 Desember/December 2023 -
              Corporate Loan 2023                                                                                                                                 29 Desember/December 2033 -
            - Pinjaman Perusahaan 2024/                       Rupiah           2,000,000         2,000,000         2,000,000                 -                -   24 Desember/December 2024 -
              Corporate Loan 2024                                                                                                                                  24 Desember/December 2034

      5     Bank Tabungan Negara ("BTN")
            - Pinjaman Perusahaan Bilateral 2019/             Rupiah           1,500,000           750,000           857,143           107,143          214,286            24 April 2019 -
              Bilateral Corporate Loan 2019                                                                                                                                 24 April 2029

      6     Bank Central Asia ("BCA")
            - Fasilitas Kredit Modal Kerja Bilateral 2019/    Rupiah           3,000,000                 -                    -              -                -     6 Desember/December 2024
              Bilateral Working Capital loan Facility 2019                                                                                                              6 Maret/March 2025
            - Pinjaman Perusahaan 2022/                       Rupiah          10,600,000        10,600,000        10,600,000                 -                -   9 Desember/December 2022 -
              Corporate Loan 2022                                                                                                                                  23 Desember/December 2032
      7     - Pinjaman Perusahaan 2024/                       Rupiah          13,000,000        13,000,000        13,000,000                 -                -   24 Desember/December 2024 -
              Corporate Loan 2024                                                                                                                                  24 Desember/December 2034


      7     Bank Danamon Indonesia
            - Fasilitas Kredit Modal Kerja Bilateral 2019/    Rupiah           2,000,000                 -                    -              -                -   12 Desember/December 2024
              Bilateral Working Capital loan Facility 2019                                                                                                          12 Januari/January 2025

      8     Bank Maybank Indonesia
            - Fasilitas Kredit Modal Kerja Bilateral 2022/    Rupiah           1,000,000                 -                    -              -                -        14 Maret/March 2024
              Bilateral Working Capital loan Facility 2022                                                                                                             14 Maret/March 2025

      9     Bank CIMB Niaga
            - Pinjaman Perusahaan 2019/                       Rupiah           3,500,000         1,875,000         2,125,000           250,000          500,000       23 April/April 2019 -
              Corporate Loan 2019                                                                                                                                      23 April/April 2029
            - Pinjaman Perusahaan 2020/                       Rupiah           1,000,000         1,000,000         1,000,000                 -                -   4 Desember/December 2020 -
              Corporate Loan 2020                                                                                                                                 23 Desember/December 2026
            - Pinjaman Perusahaan 2020 (syariah)/             Rupiah           1,000,000         1,000,000         1,000,000                 -                -   4 Desember/December 2020 -
              Corporate Loan 2020 (sharia)                                                                                                                        23 Desember/December 2026
            - Pinjaman Perusahaan 2022 (syariah)/             Rupiah             750,000           750,000           750,000                 -                -   9 Desember/December 2022 -
              Corporate Loan 2022 (sharia)                                                                                                                        23 Desember/December 2032

     10     Bank HSBC
            - Fasilitas Kredit Modal Kerja Bilateral 2021/    Rupiah           1,400,000                 -                    -              -                -         30 Juni/June 2024
              Bilateral Working Capital loan Facility 2021                                                                                                              30 Juni/June 2025
            - Fasilitas Kredit untuk Tambak Lorok 2018/      Dolar AS/                 214             104              111                  9               18    19 Februari/February 2018 -
              Credit Facility for Tambak Lorok 2018          US Dollar                                                                                               19 Agustus/August 2032

     11     Bank DBS Indonesia
            - Fasilitas Kredit Berjangka MIGA 2020/          Dolar AS/                 500             150              300                150              200 23 Desember/December 2020 -
              MIGA Term Loan Facilities 2020                 US Dollar                                                                                          23 Desember/December 2025 -
            - Fasilitas Kredit Berjangka 2021/               Dolar AS/                 500             400              500                100                - 22 Desember/December 2021 -
              Term Loan Facilities 2021                      US Dollar                                                                                          22 Desember/December 2026 -
            - Fasilitas Kredit Berjangka 2022/               Dolar AS/                 750             750              750               0.00                0 23 Desember/December 2022 -
              Term Loan Facilities 2022                      US Dollar                                                                                          23 Desember/December 2027 -

     12     MUFG Bank
            - Fasilitas Kredit Berjangka 2020/                  JPY               33,000                 -             9,900             9,900           16,500        5 Maret/March 2020 -
              Term Loan Facilities 2020                                                                                                                                5 Maret/March 2025 -
            - Fasilitas Kredit Modal Kerja Bilateral 2022/    Rupiah           1,000,000                 -                    -              -                -             30-Sep-24
              Bilateral Working Capital loan Facility 2022                                                                                                                  30-Sep-25

     13     Standard Chartered Bank ("SCB")
            - Fasilitas Arun 2013/                              EUR                    85               18               21                  4              7.1   11 Desember/December 2013 -
               Arun Facility 2013                                                                                                                                         30-Sep-27
            - Fasilitas Bangkanai 2013/                         EUR                    71               15               18                  3              5.9   23 Desember/December 2013 -
               Bangkanai Facility 2013                                                                                                                                    30-Sep-27

     14     Agence Francaise De Development ("AFD")
            - Pinjaman Perusahaan 2015/                         EUR                    70               47               51                  5              7.3          7 Mei/May 2015 -
              Corporate Loan 2015                                                                                                                                         7 Mei/May 2030



    *) Dalam jutaan mata uang original                                                                                                                            *) In million original currency
Page 118
                         PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                      DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                         Lampiran 5/108 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                         NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                                FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                                           JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                       (Expressed in millions of Rupiah, unless otherwise stated)

27. UTANG BANK (lanjutan)                                                                     27. BANK LOANS (continued)

    Pinjaman tidak terkait program percepatan                                                        Loans not related to fast track program (continued)
    (lanjutan)

                                                                                                   Jumlah pinjaman/
                                                                          Fasilitas                                                  Pembayaran kembali/
                                                                                                 Pembayaran kembali/
                                                                                                 Outstanding balance*)
                                                                         maksimum/                                                       Repayment*)
                                                                                                       Repayment
                 Kreditur dan jenis pinjaman/             Mata uang/      Maximum              30 Jun/            31 Des/           30 Jun/        31 Des/             Periode pinjaman/
    No.            Creditor and type of loan              Currency        facility*)         Jun 30, 2025      Dec 31, 2024       Jun 30, 2025   Dec 31, 2024              Loan term


     15   Kreditanstalt fur Wiederaufbau ("KfW")
          - Fasilitas Kredit untuk Bangkanai Peaker/       EUR                         83               29               33                  4             8.3          15 September 2017 -
             Credit Facility for Bangkanai Peaker                                                                                                                  15 Desember/December 2028
          - Fasiitas Kredit untuk Kumbih 03 2017/          EUR                         85                -               0.9                 1             0.7    15 Desember/December 2017 -
             Credit Facility for Kumbih 03 2017                                                                                                                    30 Desember/December 2032
          - Fasiitas Kredit untuk Hydropower Programme 2019/
                                                           EUR                         295             1.4                    -              -             3.2    5 September/September 2019 -
             Credit Facility for Hydropower Programme 2019                                                                                                               15 November 2033
          - Fasiitas Kredit untuk Ulumbu&Mataloko 2018/ EUR                            150               -                    -              -             1.4       11 Oktober/October 2018 -
             Credit Facility for Ulumbu & Mataloko 2018                                                                                                                  15 November 2033
          - Fasiitas Kredit untuk RBL SNT (KfW 27834)/ EUR                             45               19               23                  3             6.4           23 Mei/May 2016 -
             Credit Facility for RBL SNT (KfW 27834)                                                                                                                     30 Juni/June 2028
          - Fasiitas Kredit untuk RBL SNT (KfW 29069)/ EUR                             251             251              251                  -               -      8 Desember/December 2020
             Credit Facility for RBL SNT (KfW 29069)                                                                                                                      15 Mei/May 2036

     16   Asian Development Bank ("ADB")
          - Fasilitas Kredit Penguatan                      EUR                        490             343              359                 16              33    4 Desember/December 2015 -
                                                          Dolar AS/
              Gardu 2015/                                                              29                -                    -              -             1.9             15-Sep-35
                                                          US Dollar
              Credit Facility Grid Strengthening 2015       EUR                        19               18               19                  1               -

          -   Fasilitas Kredit Penguatan                    Dolar AS/                  25               17               18                  1             1.6    4 Desember/December 2015 -
              Gardu 2015/                                   US Dollar                                                                                                     15-Sep-35
              Credit Facility Grid Strengthening 2015
          -   Fasilitas Kredit akses Energi berkelanjutan                                                                                                           10 Oktober/October 2017 -
              Di Kawasan Indonesia Timur 2017/              Dolar AS/                  584               -                    -              -               -          15 Mei/May 2037
              Credit Facility for Sustainable Energy        US Dollar
              Access in Eastern Indonesia 2017                 JPY               78,688             69,945            72,860             2,914             5829
          -   Fasilitas Kredit akses Energi berkelanjutan                                                                                                         8 Desember/December 2020 -
              Di Kawasan Indonesia Timur 2020 (Tahap II)/Dolar AS/                     112              18               18                  -               -       15 Oktober/October 2040
              Credit Facility for Sustainable Energy        US Dollar
              Access in Eastern Indonesia 2020 (Phase II)      JPY               70,495             70,495            70,495                 -               -
          -   Fasilitasi Kredit Program Akses Energi yang                                                                                                         31 Desember/December 2021 -
              Berkelanjutan dan Andal - Jawa Barat dan Jawa Dolar
                                                               Tengah/
                                                                  AS/                  600             356              356                  -               -       15 Oktober/October 2041
              Credit Facility for Sustainable and Reliable Energy
                                                            US Dollar
              Access Program - Western and Central Java

     17   Export Development Canada ("EDC")
          Private Limited Company (“HEXIM”)
          - Fasilitas Kredit untuk Batam Mobile
             Power Plant 2017/                            Dolar AS/                    14                5                    5              1               1          1 Mei/May 2017 -
             Credit Facility for Batam Mobile             US Dollar                                                                                                  27 Januari/January 2029
             Powe Plant 2017
          - Fasilitas Kredit untuk Batam Mobile
             Power Plant 2016/                            Dolar AS/                    436             145              163                 18              36    2 Desember/December 2016 -
             Credit Facility for Batam Mobile             US Dollar                                                                                                  27 Januari/January 2029
             Powe Plant 2016

     18   Japan Bank for International Cooperation ("JBIC")
          - Fasilitas Kredit untuk Pembangunan               JPY                 16,430              8,899             9,584               685          1,369
             PLTU Lontar 2016/                             Dolar AS/                179                 93               101                 7             15        14 Maret/March 2016 -
             Credit Facility for Construction of           US Dollar                                                                                                 1 Oktober/October 2031
             Lontar Steam Electricity Power Plant 2016/
          - Fasilitas Kredit untuk Pembangunan               JPY                 30,827             14,946            16,269             1,323          2,647
             PLTU Jawa 2 Priok 2016/                       Dolar AS/                 45                 23                25                 2              4       20 Oktober/October 2016 -
             Credit Facility for Construction of Jawa 2    US Dollar                                                                                                      30 April 2031
             Priok Steam Electricity Power Plant 2016/
          - Fasilitas Kredit untuk Pembangunan               JPY                 14,545              7,154             7,750               596          1,192
             Fasilitas Muara Karang 2017/                  Dolar AS/                 37                 19                20                 2              3        10 Maret/March 2017 -
             Credit Facility for Construction of           US Dollar                                                                                                    29 Mei/May 2031
             Muara Karang Facility 2017/
          - Fasilitas Kredit untuk Pembangunan               JPY                 16,939              7,733             8,924             1,191          1,754
             PLTU Kalseteng 2 2017/                        Dolar AS/                 89                 45                50                 5              9          20 Juni/June 2017 -
             Credit Facility for Construction of Kalseteng US Dollar                                                                                                        15-Sep-32
             2 Steam Electricity Power Plant 2017/

     19   International Bank for Reconstruction and
          Development ("IBRD")
          - Fasilitas Kredit untuk Membiayai Power        Dolar AS/                    500               -                    -              -              26         20 Mei/May 2016 -
             Distribution Development Program 2016/       US Dollar                                                                                                   15 Maret/March 2036
             Credit Facility to Finance Power               EUR                        374             362              374                 12               -
             Distribution Development Program 2016
          - Fasilitas Kredit akses Energi berkelanjutan   Dolar AS/                    500              52               52                  -               0          7 Mei/May 2024 -
             Di Kawasan Indonesia Timur 2024/             US Dollar                                                                                                 15 Februari/February 2044
             Credit Facility for Sustainable Energy
             Access in Eastern Indonesia 2024

     20   KEXIM
          - Fasilitas Kredit untuk Membiayai
            PLTGU Grati 2016/                             Dolar AS/                    71               33               36                  3               6        24 Juni/June 2016 -
            Credit Facility to Finance                    US Dollar                                                                                               23 Desember/December 2030
            PLTGU Grati 2016

     21   Islamic Development Bank ("IDB")
          - Fasilitas Kredit untuk Membiayai Power
              Grid Enhancement Program 2017/              Dolar AS/                    210             222              230                  7               7      10 Januari/January 2017 -
              Credit Facility to Finance Power            US Dollar                                                                                                  6 Agustus/August 2033
              Grid Enhancement Program 2017

     22   Sumitomo Mitsui Banking Corporation ("SMBC")
          - Fasilitas Kredit untuk Membiayai
            PLTA Jatigede 2017/                        Dolar AS/                       73               46               50                  4               8       30 Maret/March 2017 -
            Credit Facility to Finance                 US Dollar                                                                                                      30 Maret/March 2031
            PLTA Jatigede 2017
          - Fasilitas Kredit Berjangka 2018/           Dolar AS/                   1,320                 -                    -              -               -      1 Agustus/August 2018 -
            Term Loan Facilities 2018                  US Dollar                                                                                                     1 Agustus/August 2023



    *) Dalam jutaan mata uang original                                                                                                                       *) In million original currency
Page 119
                         PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                      DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                       Lampiran 5/109 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                       NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                              FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                                         JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                     (Expressed in millions of Rupiah, unless otherwise stated)

27. UTANG BANK (lanjutan)                                                                   27. BANK LOANS (continued)
    Pinjaman tidak terkait program percepatan                                                      Loans not related to fast track program (continued)
    (lanjutan)
                                                                                                Jumlah pinjaman/
                                                                        Fasilitas                                                 Pembayaran kembali/
                                                                                              Pembayaran kembali/
                                                                                              Outstanding balance*)
                                                                       maksimum/                                                      Repayment*)
                                                                                                    Repayment
               Kreditur dan jenis pinjaman/               Mata uang/   Maximum              30 Jun/            31 Des/           30 Jun/        31 Des/           Periode pinjaman/
   No.           Creditor and type of loan                Currency     facility*)         Jun 30, 2025      Dec 31, 2024       Jun 30, 2025   Dec 31, 2024            Loan term


    23   Mizuho
         - Fasilitas Kredit untuk Membiayai
            Lombok Peaker 2017/                              EUR                    74               30               33                  4              7        24 Mei/May 2017 -
            Credit Facility to Finance                                                                                                                          24 Januari/January 2029
            Lombok Peaker 2017

    24   Credit Agricole CIB PARIS
         - Fasilitas Kredit untuk Membiayai
           PLTGU Muara Tawar 2017/                        Dolar AS/                 249             137              147                 10             20        8 November 2017 -
           Credit Facility to Finance                     US Dollar                                                                                                 8 Mei/May 2032
           PLTGU Muara Tawar 2017

    25   BNP Paribas SA
         - Fasilitas Kredit untuk Membiayai
           Sumbagut 2 Peaker 2018/                           EUR                    108              52               56                  4              8    9 Februari/February 2018 -
           Credit Facility to Finance                                                                                                                           9 Oktober/October 2031
           Sumbagut 2 Peaker 2018

    26   BGK
         - Fasilitas Kredit untuk Membiayai
           PLTU Lombok FTP-2 2018/                           EUR                    63               36               40                  3              7    21 Februari/February 2018 -
           Credit Facility to Finance                                                                                                                          28 Februari/February 2033
           PLTU Lombok FTP-2 2018

    27   SACE
         - Fasilitas Kredit untuk Membiayai
           PLTGU Grati 2016/                                 EUR                    37               17               18                  2              3       24 Juni/June 2016 -
           Credit Facility to Finance                                                                                                                        23 Desember/December 2030
           PLTGU Grati 2016

    28   Exportni Garancni
         a Pojistovaci Spolecnost (“EGAP”)
         - Fasilitas Kredit untuk Membiayai
            PLTGU Grati 2016/                             Dolar AS/                 17                8                    9              1              1       24 Juni/June 2016 -
            Credit Facility to Finance                    US Dollar                                                                                          23 Desember/December 2030
            PLTGU Grati 2016

    29   AIIB
         - Fasilitas Kredit untuk Membiayai Proyek Penguatan
            Distribusi Tenaga Listrik Jawa Timur & Bali 2021/
                                                         Dolar AS/                  310             186              186                  -              -    10 Februari/February 2021 -
            Credit Facility to Finance East Java & Bali US Dollar                                                                                              15 Oktober/October 2040
            Power Distribution Strengthening Project 2021

    30   LPEI
         - Fasilitas Kredit Modal Kerja Bilateral 2021/    Rupiah           3,500,000                 -                    -              -              -   20 Desember/December 2022
           Bilateral Working Capital loan Facility 2021                                                                                                      20 Desember/December 2024

    31   UOB
         - Fasilitas Kredit Modal Kerja Bilateral 2021/    Rupiah           1,000,000                 -                    -              -              -         31 Mei/May 2024
           Bilateral Working Capital loan Facility 2021                                                                                                            31 Mei/May 2025

    32   Permata
         - Pinjaman Perusahaan 2022/                       Rupiah           2,750,000         2,481,854         2,481,854                 -              -   8 Desember/December 2022 -
           Corporate Loan 2022                                                                                                                               8 Desember/December 2032 -
         - Fasilitas Kredit Modal Kerja Bilateral 2024/                     1,000,000                 -                    -              -              -    29 Februari/February 2024 -
           Bilateral Working Capital loan Facility 2024                                                                                                       28 Februari/February 2025 -

    33   Bank Central Asia Syariah ("BCA Syariah")
         - Pinjaman Perusahaan 2022/                       Rupiah             150,000           150,000           150,000                 -              -   9 Desember/December 2022 -
           Corporate Loan 2022                                                                                                                               9 Desember/December 2032 -

    34   KB Bukopin
         - Pinjaman Perusahaan 2022/                       Rupiah             300,000           300,000           300,000                 -              -   9 Desember/December 2022 -
           Corporate Loan 2022                                                                                                                               9 Desember/December 2032 -

    35   Bank SBII
         - Pinjaman Perusahaan 2022/                       Rupiah             200,000           200,000           200,000                 -              -   9 Desember/December 2022 -
           Corporate Loan 2022                                                                                                                               9 Desember/December 2032 -

    36   Clean Technology Fund "CTF"
         - Fasilitas Kredit akses Energi berkelanjutan    Dolar AS/                 15                -                    -              -              -         7 Mei/May 2024 -
            Di Kawasan Indonesia Timur 2024/              US Dollar                                                                                            15 Februari/February 2053
            Credit Facility for Sustainable Energy
            Access in Eastern Indonesia 2024

    37   Canada Clean Energy and Forest Climate Fund "CCEFCF"
         - Fasilitas Kredit akses Energi berkelanjutan Dolar AS/                    48                -                    -              -              -         7 Mei/May 2024 -
           Di Kawasan Indonesia Timur 2024/            US Dollar                                                                                               15 Februari/February 2043
           Credit Facility for Sustainable Energy
           Access in Eastern Indonesia 2024

    38   PT SMI (Persero)
         - Bank Loan Capex Bilateral 2023 - Konvensional
                                                       Rupiah
                                                         PT SMI             1,000,000           661,080           661,080                 -              -   29 Desember/December 2023 -
           Corporate Loan 2023                                                                                                                               29 Desember/December 2033 -
         - Bank Loan Capex Bilateral 2023 - Syariah PT SMI                  1,000,000           693,986           693,986                 -              -   29 Desember/December 2023 -
           Corporate Loan Sharia 2023                                                                                                                        29 Desember/December 2033 -

    39   PT Bank QNB Indonesia Tbk
         - Kredit Modal Kerja 2022 - Bank QNB - Revolving                     500,000                 -                    -              -              -            21-Sep-24
           Bilateral Working Capital loan Facility 2022                                                                                                               21-Sep-25




    *) Dalam jutaan mata uang original                                                                                                                   *) In million original currency
Page 120
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                             Lampiran 5/110 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                          NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                 FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                            JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)        (Expressed in millions of Rupiah, unless otherwise stated)

27. UTANG BANK (lanjutan)                                    27. BANK LOANS (continued)
    Pinjaman tidak terkait program percepatan                       Loans not related to fast track program (continued)
    (lanjutan)

                                                30 Juni/                 31 Desember/
                                                June 30,                 December 31,
                                                  2025                       2024
    Tingkat suku bunga per tahun                                                                      Interest rate per annum
      Rupiah                                 5.00% - 9.03%               5.00% - 9.10%                                  Rupiah
      USD                                    2.56% - 7.17%               2.56% - 8.03%                                    USD
      EUR                                    0.33% - 5.40%               0.33% - 5.40%                                    EUR
      JPY                                    1.11% - 1.74%               0.62% - 1.74%                                    JPY

    Perusahaan melakukan pembayaran pokok dan                       The Company has made payments of principal and
    bunga pinjaman bank sesuai dengan jadwal                        interest on the bank loans in accordance with the
    pembayaran dalam perjanjian pinjaman bank yang                  schedule of payment specified within the
    berlaku pada tanggal laporan.                                   agreements of the bank loans as at the reporting
                                                                    date.

    Selama periode enam bulan yang berakhir pada                     During the six month periods ended June 30, 2025
    tanggal 30 Juni 2025 dan 31 Desember 2024, Grup                 and December 31, 2024, the Group made
    melakukan penarikan seluruh pinjaman bank                       withdrawals from all bank loans amounting to
    sebesar USD2.146.281 (setara dengan Rp34.836),                  sebesar USD2,146,281 (equivalent to Rp34,836),
    EUR1.368.443 (setara dengan Rp25.106) dan                       EUR1,368,443 (equivalent to Rp25,106) and
    Rp20.549.673 (Desember 2024: USD594.571.260                     Rp20,549,673 (December 2024: USD594,571,260
    (setara dengan Rp9.355.894), EUR129.122.011                     (equivalent to Rp9,355,894), EUR129,122,011
    (setara dengan Rp2.205.677), JPY5.009.426.604                   (equivalent to Rp2,205,677), JPY5,009,426,604
    (setara dengan Rp514.042) dan Rp54.795.933).                    (equivalent to Rp514,042) and Rp54,795,933). The
    Pelunasan lebih awal secara sukarela atas pokok                 voluntary early repayments of the loan principal
    pinjaman selama tahun 2025 adalah sebesar                       during 2025 amounting to RpNil (December 2024:
    RpNihil (Desember 2024: RpNihil).                               RpNil).

    Sehubungan dengan fasilitas pinjaman tersebut                   In relation to this loan facility, the Company has
    Perusahaan telah memenuhi batasan-batasan yang                  complied with the covenants in this bank loans
    diwajibkan dalam perjanjian pinjaman bank                       agreements.
    tersebut.



28. UTANG OBLIGASI DAN SUKUK IJARAH                          28. BONDS PAYABLE AND SUKUK IJARA

    Obligasi dan sukuk ijarah                                       Bonds and sukuk ijara

                                                30 Juni/             31 Desember/
                                                June 30,             December 31,
                                                  2025                   2024

    Obligasi dan Sukuk Ijarah Rupiah                                                           Rupiah Bonds and Sukuk Ijara
     Obligasi Berkelanjutan IV                                                                    Shelf Registration Bonds IV
        PLN Tahap I Tahun 2020                       1,500,000             1,500,000                        PLN I Year 2020
     Sukuk Ijarah Berkelanjutan IV                                                           Shelf Registration Sukuk Ijara IV
        PLN Tahap I Tahun 2020                         376,500               376,500                        PLN I Year 2020
     Obligasi Berkelanjutan III                                                                 Shelf Registration Bonds III
        PLN Tahap VII Tahun 2020                     1,321,280             1,420,435                   PLN VII Year 2020
     Obligasi Berkelanjutan III                                                                 Shelf Registration Bonds III
        PLN Tahap VI Tahun 2020                      4,271,800             4,812,430                   PLN VI Year 2020
     Sukuk Ijarah Berkelanjutan III                                                         Shelf Registration Sukuk Ijara III
        PLN Tahap VI Tahun 2020                        115,500               115,500                   PLN VI Year 2020
Page 121
                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                             Lampiran 5/111 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                               FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                          JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)      (Expressed in millions of Rupiah, unless otherwise stated)

28. UTANG OBLIGASI               DAN     SUKUK   IJARAH       28. BONDS PAYABLE AND SUKUK IJARA (continued)
    (lanjutan)

    Obligasi dan sukuk ijarah (lanjutan)                           Bonds and sukuk ijara (continued)

                                                 30 Juni/          31 Desember/
                                                 June 30,          December 31,
                                                   2025                2024

      Obligasi dan Sukuk Ijarah Rupiah                                                      Rupiah Bonds and Sukuk Ijara
       Obligasi Berkelanjutan III                                                            Shelf Registration Bonds III
          PLN Tahap V Tahun 2019                      1,117,200         1,117,200                    PLN V Year 2019
       Sukuk Ijarah Berkelanjutan III                                                    Shelf Registration Sukuk Ijara III
          PLN Tahap V Tahun 2019                        791,000           791,000                    PLN V Year 2019
       Obligasi Berkelanjutan III                                                            Shelf Registration Bonds III
          PLN Tahap IV Tahun 2019                     2,316,620         2,316,620                   PLN IV Year 2019
       Sukuk Ijarah Berkelanjutan III                                                    Shelf Registration Sukuk Ijara III
          PLN Tahap IV Tahun 2019                       976,000           976,000                   PLN IV Year 2019
       Obligasi Berkelanjutan III                                                            Shelf Registration Bonds III
          PLN Tahap III Tahun 2019                      812,000           812,000                    PLN III Year 2019
       Sukuk Ijarah Berkelanjutan III                                                    Shelf Registration Sukuk Ijara III
          PLN Tahap III Tahun 2019                      337,000           337,000                     PLN IIIYear 2019
       Obligasi Berkelanjutan III                                                            Shelf Registration Bonds III
          PLN Tahap II Tahun 2018                       622,000           622,000                     PLN II Year 2018
       Sukuk Ijarah Berkelanjutan III                                                    Shelf Registration Sukuk Ijara III
          PLN Tahap II Tahun 2018                       110,000           110,000                     PLN II Year 2018
       Obligasi Berkelanjutan III                                                            Shelf Registration Bonds III
          PLN Tahap I Tahun 2018                      1,200,000         1,200,000                     PLN I Year 2018
       Sukuk Ijarah Berkelanjutan III                                                    Shelf Registration Sukuk Ijara III
          PLN Tahap I Tahun 2018                        623,000           623,000                     PLN I Year 2018
       Obligasi Berkelanjutan II                                                              Shelf Registration Bonds II
          PLN Tahap III Tahun 2018                    2,068,000         2,078,000                    PLN III Year 2018
       Sukuk Ijarah Berkelanjutan II                                                     Shelf Registration Sukuk Ijara II
          PLN Tahap III Tahun 2018                      594,500           594,500                    PLN III Year 2018
       Obligasi Berkelanjutan II                                                              Shelf Registration Bonds II
          PLN Tahap II Tahun 2017                     1,893,000         1,893,000                     PLN II Year 2017
       Sukuk Ijarah Berkelanjutan II                                                     Shelf Registration Sukuk Ijara II
          PLN Tahap II Tahun 2017                       611,000           611,000                     PLN II Year 2017
       Obligasi Berkelanjutan II                                                              Shelf Registration Bonds II
          PLN Tahap I Tahun 2017                      1,217,000         1,217,000                     PLN I Year 2017
       Sukuk Ijarah Berkelanjutan II                                                     Shelf Registration Sukuk Ijara II
          PLN Tahap I Tahun 2017                        214,000           214,000                     PLN I Year 2017

      Surat Utang Jangka                                                                                  Global Medium
        Menengah Global - USD                                                                         Term Notes - USD
      Penerbitan tahun 2020                          24,346,500        24,235,500                          Issued in 2020
      Penerbitan tahun 2019                          38,954,400        38,776,800                          Issued in 2019
      Penerbitan tahun 2018                          48,693,000        48,471,000                          Issued in 2018
      Penerbitan tahun 2017                          32,462,000        32,314,000                          Issued in 2017
      Penerbitan tahun 2012                          16,231,000        16,157,000                          Issued in 2012

      Surat Utang Jangka                                                                                  Global Medium
        Menengah Global - EUR                                                                         Term Notes - EUR
      Penerbitan tahun 2019                           9,515,850         8,411,350                          Issued in 2019
      Penerbitan tahun 2018                           9,515,850         8,411,350                          Issued in 2018

      Obligasi - JPY                                                                                        Obligasi - JPY
      Penerbitan tahun 2019                             112,614           103,428                           Issued in 2019

      Obligasi Terjamin - USD                                                                     Guaranteed Notes - USD
      Penerbitan tahun 2009                                                                                Issued in 2009
      Penerbitan tahun 2007                           4,679,592         4,658,257                          Issued in 2007
        Penerbitan tahun 2006                                                                            Issued in 2006

      Subjumlah                                     207,598,206       205,275,870                                 Subtotal

      Biaya emisi belum diamortisasi                 (6,087,133)       (6,216,627)        Unamortized debt issuance cost
      Jumlah                                        201,511,073       199,059,244                                    Total
Page 122
                       PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                    DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                            Lampiran 5/112 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                              NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                     FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                                JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                            (Expressed in millions of Rupiah, unless otherwise stated)

28. UTANG OBLIGASI                        DAN     SUKUK         IJARAH              28. BONDS PAYABLE AND SUKUK IJARA (continued)
    (lanjutan)

    Obligasi dan sukuk ijarah (lanjutan)                                                  Bonds           and         sukuk           ijara        (continued)


                                                               30 Juni/                    31 Desember/
                                                               June 30,                    December 31,
                                                                 2025                          2024


    Disajikan di laporan posisi keuangan                                                                              Presented in consolidated statements
      konsolidasian sebagai:                                                                                                         of financial position:
      Liabilitas jangka pendek                                       11,373,850                  10,532,135                              Current liabilities
      Liabilitas jangka panjang                                     190,137,223                 188,527,108                         Non-current liabilites

    Jumlah                                                          201,511,073                 199,059,243                                                   Total


    Pada tanggal 30 Juni 2025, rincian obligasi yang                                      As at June 30, 2025, details of bonds which were
    diterbitkan sebesar harga nominal dalam mata uang                                     issued at nominal value and are denominated in
    Rupiah adalah sebagai berikut:                                                        Rupiah are as follows:

                                                                                          Tingkat kupon/   Periode
                                                                                          Imbalan ijarah pembayaran
                                                                                            per tahun/      bunga/
                                                                                           Coupun rate/    Interest
                                             Pokok/             Periode pinjaman/            Ijara fee    payment     Wali amanat/
                                            Principal               Loan term               per annum       period      Trustee

    Obligasi Berkelanjutan IV                                                                                                                 Shelf Registration Bonds IV
      PLN Tahap I Tahun 2020                                                                                                                          PLN I Year 2020
      Seri A                                     312,000        8 September 2020 -            6.70%                                                            Series A
                                                                September 8, 2025
       Seri B                                      28,000       8 September 2020 -            7.25%                                                           Series B
                                                                September 8, 2027
       Seri C                                    158,000        8 September 2020 -            7.90%      Kuartalan/   Bank Tabungan                           Series C
                                                                September 8, 2030                        Quaterly        Negara
       Seri D                                    841,000        8 September 2020 -            8.65%                                                           Series D
                                                                September 8, 2035
       Seri E                                    161,000        8 September 2020 -            8.86%                                                           Series E
                                                                September 8, 2040
       Subtotal                                 1,500,000
                                                        0
    Obl Syariah Ijarah Berkelanjutan IV                                                                                                 Shelf Registration Sukuk Ijarah IV
      Tahap I Tahun 2020                                                                                                                               PLN I Year 2020
      Seri A                                       39,000       8 September 2020 -            6.70%                                                           Series A
                                                                September 8, 2025
       Seri B                                      35,000       8 September 2020 -            7.25%                                                           Series B
                                                                September 8, 2027
       Seri C                                    200,000        8 September 2020 -            7.90%      Kuartalan/   Bank Tabungan                           Series C
                                                                September 8, 2030                        Quaterly        Negara
       Seri D                                      56,000       8 September 2020 -            8.65%                                                           Series D
                                                                September 8, 2035
       Seri E                                      46,500       8 September 2020 -            8.86%                                                           Series E
                                                                September 8, 2040
       Subtotal                                  376,500
                                                       0
    Obligasi Berkelanjutan III                                                                                                                 Shelf Registration Bonds III
      PLN Tahap VII Tahun 2020                                                                                                                      PLN VII Year 2020
      Seri A                                                     6 Mei/May 2020 -             7.92%                                                            Series A
                                                                  6 Mei/May 2023
       Seri B                                                    6 Mei/May 2020 -             8.25%      Kuartalan/   Bank Tabungan                           Series B
                                                                  6 Mei/May 2026                         Quaterly        Negara
       Seri C                                    312,180         6 Mei/May 2020 -             8.55%                                                           Series C
                                                                  6 Mei/May 2027
       Seri D                                   1,009,100        6 Mei/May 2020 -             9.10%                                                           Series D
                                                                  6 Mei/May 2030
       Subtotal                                 1,321,280
                                                        0
    Obligasi Berkelanjutan III                                                                                                                Shelf Registration Bonds III
      PLN Tahap VI Tahun 2020                                                                                                                        PLN VI Year 2020
      Seri A                                                18 Februari/February 2020 -       7.20%                                                            Series A
                                                             18 Februari/February 2025
       Seri B                                    672,500    18 Februari/February 2020 -       7.70%                                                           Series B
                                                             18 Februari/February 2027
       Seri C                                    544,250    18 Februari/February 2020 -       8.00%      Kuartalan/   Bank Tabungan                           Series C
                                                             18 Februari/February 2030                   Quaterly        Negara
       Seri D                                   1,459,000   18 Februari/February 2020 -       8.70%                                                           Series D
                                                             18 Februari/February 2035
       Seri E                                   1,596,050   18 Februari/February 2020 -       9.05%                                                           Series E
                                                             18 Februari/February 2040
       Subtotal                                 4,271,800
Page 123
                        PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                     DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                        Lampiran 5/113 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                              NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                     FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                                JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                            (Expressed in millions of Rupiah, unless otherwise stated)

28. UTANG OBLIGASI                   DAN      SUKUK          IJARAH             28. BONDS PAYABLE AND SUKUK IJARA (continued)
    (lanjutan)

    Obligasi dan sukuk ijarah (lanjutan)                                                Bonds and sukuk ijara (continued)

                                                                                     Tingkat kupon/   Periode
                                                                                     Imbalan ijarah pembayaran
                                                                                       per tahun/      bunga/
                                                                                      Coupun rate/    Interest
                                       Pokok/             Periode pinjaman/             Ijara fee    payment     Wali amanat/
                                      Principal               Loan term                per annum       period      Trustee

                                                  0
    Sukuk Ijarah Berkelanjutan III                                                                                               Shelf Registration Sukuk Ijarah III
      PLN Tahap VI Tahun 2020                                                                                                                PLN VI Year 2020
      Seri A                                 40,500   18 Februari/February 2020 -        7.70%                                                        Series A
                                                       18 Februari/February 2027
       Seri B                                 3,500   18 Februari/February 2020 -        8.00%      Kuartalan/   Bank Tabungan                         Series B
                                                       18 Februari/February 2030                    Quaterly        Negara
       Seri C                                 9,000   18 Februari/February 2020 -        8.70%                                                         Series C
                                                       18 Februari/February 2035
       Seri D                                62,500   18 Februari/February 2020 -        9.05%                                                         Series D
                                                       18 Februari/February 2040
       Subtotal                            115,500
                                                 0
    Obligasi Berkelanjutan III                                                                                                         Shelf Registration Bonds III
      PLN Tahap V Tahun 2019                                                                                                                 PLN V Year 2019
      Seri A                                           1 Oktober/October, 2019 -         7.90%                                                         Series A
                                                        1 Oktober/October, 2024
       Seri B                              445,000     1 Oktober/October, 2019 -         8.40%                                                         Series B
                                                        1 Oktober/October, 2026
       Seri C                                 6,200    1 Oktober/October, 2019 -         8.60%      Kuartalan/   Bank Tabungan                         Series C
                                                        1 Oktober/October, 2029                     Quaterly        Negara
       Seri D                              166,000     1 Oktober/October, 2019 -         9.40%                                                         Series D
                                                        1 Oktober/October, 2034
       Seri E                              500,000     1 Oktober/October, 2019 -         9.90%                                                         Series E
                                                        1 Oktober/October, 2039
       Subtotal                           1,117,200
                                                  0
    Sukuk Ijarah Berkelanjutan III                                                                                               Shelf Registration Sukuk Ijarah III
      PLN Tahap V Tahun 2019                                                                                                                  PLN V Year 2019
      Seri A                                           1 Oktober/October, 2019 -         7.90%                                                        Series A
                                                        1 Oktober/October, 2024
       Seri B                                10,000    1 Oktober/October, 2019 -         8.40%                                                         Series B
                                                        1 Oktober/October, 2026
       Seri C                                92,000    1 Oktober/October, 2019 -         8.60%      Kuartalan/   Bank Tabungan                         Series C
                                                        1 Oktober/October, 2029                     Quaterly        Negara
       Seri D                              135,000     1 Oktober/October, 2019 -         9.40%                                                         Series D
                                                        1 Oktober/October, 2034
       Seri E                              554,000     1 Oktober/October, 2019 -         9.90%                                                         Series E
                                                        1 Oktober/October, 2039
       Subtotal                            791,000
                                                 0
    Obligasi Berkelanjutan III                                                                                                        Shelf Registration Bonds III
      PLN Tahap IV Tahun 2019                                                                                                                PLN IV Year 2019
      Seri A                                           1 Agustus/August, 2019 -          8.00%                                                         Series A
                                                        1 Agustus/August, 2024
       Seri B                              315,250     1 Agustus/August, 2019 -          8.50%                                                         Series B
                                                        1 Agustus/August, 2026
       Seri C                              549,000     1 Agustus/August, 2019 -          8.70%      Kuartalan/   Bank Tabungan                         Series C
                                                        1 Agustus/August, 2029                      Quaterly        Negara
       Seri D                              395,000     1 Agustus/August, 2019 -          9.50%                                                         Series D
                                                        1 Agustus/August, 2034
       Seri E                             1,057,370    1 Agustus/August, 2019 -          9.98%                                                         Series E
                                                        1 Agustus/August, 2039
       Subtotal                           2,316,620
                                                  0
    Sukuk Ijarah Berkelanjutan III                                                                                               Shelf Registration Sukuk Ijarah III
      PLN Tahap IV Tahun 2019                                                                                                                PLN IV Year 2019
      Seri A                                           1 Agustus/August, 2019 -          8.00%                                                        Series A
                                                        1 Agustus/August, 2024
       Seri B                              368,000     1 Agustus/August, 2019 -          8.50%                                                         Series B
                                                        1 Agustus/August, 2026
       Seri C                                20,000    1 Agustus/August, 2019 -          8.70%      Kuartalan/   Bank Tabungan                         Series C
                                                        1 Agustus/August, 2029                      Quaterly        Negara
       Seri D                                49,000    1 Agustus/August, 2019 -          9.50%                                                         Series D
                                                        1 Agustus/August, 2034
       Seri E                              539,000     1 Agustus/August, 2019 -          9.98%                                                         Series E
                                                        1 Agustus/August, 2039
       Subtotal                            976,000
                                                 0
    Obligasi Berkelanjutan III                                                                                                         Shelf Registration Bonds III
      PLN Tahap III Tahun 2019                                                                                                               PLN III Year 2019
      Seri B                                          19 Februari/February, 2019 -       9.10%                                                         Series B
                                                       19 Februari/February, 2024
       Seri C                              183,000    19 Februari/February, 2019 -       9.35%      Kuartalan/   Bank Tabungan                         Series C
                                                       19 Februari/February, 2026                   Quaterly        Negara
       Seri D                              211,000    19 Februari/February, 2019 -       9.60%                                                         Series D
                                                       19 Februari/February, 2029
       Seri E                              263,000    19 Februari/February, 2019 -       9.80%                                                         Series E
                                                       19 Februari/February, 2034
       Seri F                              155,000    19 Februari/February, 2019 -       9.95%                                                         Series F
                                                       19 Februari/February, 2039
       Subtotal                            812,000
                                                 0
    Sukuk Ijarah Berkelanjutan III                                                                                               Shelf Registration Sukuk Ijarah III
      PLN Tahap III Tahun 2019                                                                                                               PLN III Year 2019
      Seri B                                          19 Februari/February, 2019 -       9.10%                                                        Series B
                                                       19 Februari/February, 2024
       Seri C                              204,000    19 Februari/February, 2019 -       9.35%      Kuartalan/   Bank Tabungan                         Series C
                                                       19 Februari/February, 2026                   Quaterly        Negara
       Seri D                                45,000   19 Februari/February, 2019 -       9.60%                                                         Series D
Page 124
                         PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                      DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                         Lampiran 5/114 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                               NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                      FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                                 JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                             (Expressed in millions of Rupiah, unless otherwise stated)


28. UTANG OBLIGASI                   DAN          SUKUK       IJARAH              28. BONDS PAYABLE AND SUKUK IJARA (continued)
    (lanjutan)

    Obligasi dan sukuk ijarah (lanjutan)                                                 Bonds and sukuk ijara (continued)
                                                                                      Tingkat kupon/   Periode
                                                                                      Imbalan ijarah pembayaran
                                                                                        per tahun/      bunga/
                                                                                       Coupun rate/    Interest
                                       Pokok/              Periode pinjaman/             Ijara fee    payment     Wali amanat/
                                      Principal                Loan term                per annum       period      Trustee

                                                   0
    Sukuk Ijarah Berkelanjutan III                                                                                                Shelf Registration Sukuk Ijarah III
      PLN Tahap III Tahun 2019                                                                                                                PLN III Year 2019
      Seri B                                           19 Februari/February, 2019 -       9.10%                                                        Series B
                                                        19 Februari/February, 2024
       Seri C                              204,000     19 Februari/February, 2019 -       9.35%      Kuartalan/   Bank Tabungan                         Series C
                                                        19 Februari/February, 2026                   Quaterly        Negara
       Seri D                                45,000    19 Februari/February, 2019 -       9.60%                                                         Series D
                                                        19 Februari/February, 2029
       Seri E                                60,000    19 Februari/February, 2019 -       9.80%                                                         Series E
                                                        19 Februari/February, 2034
       Seri F                                28,000    19 Februari/February, 2019 -       9.95%                                                         Series F
                                                        19 Februari/February, 2039
       Subtotal                            337,000
                                                 0
    Obligasi Berkelanjutan III                                                                                                          Shelf Registration Bonds III
      PLN Tahap II Tahun 2018                                                                                                                  PLN II Year 2018
      Seri A                                           10 Oktober/October, 2018 -         8.65%                                                         Series A
                                                        10 Oktober/October, 2023
       Seri B                              483,000     10 Oktober/October, 2018 -         9.00%                                                         Series B
                                                        10 Oktober/October, 2025
       Seri C                                78,000    10 Oktober/October, 2018 -         9.10%      Kuartalan/   Bank Tabungan                         Series C
                                                        10 Oktober/October, 2028                     Quaterly        Negara
       Seri D                                15,000    10 Oktober/October, 2018 -         9.30%                                                         Series D
                                                        10 Oktober/October, 2033
       Seri E                                46,000    10 Oktober/October, 2018 -         9.65%                                                         Series E
                                                        10 Oktober/October, 2023
       Subtotal                            622,000
                                                 0
    Sukuk Ijarah Berkelanjutan III                                                                                                Shelf Registration Sukuk Ijarah III
      PLN Tahap II Tahun 2018                                                                                                                  PLN II Year 2018
      Seri A                                           10 Oktober/October, 2018 -         8.65%                                                        Series A
                                                        10 Oktober/October, 2023
       Seri B                                45,000    10 Oktober/October, 2018 -         9.00%      Kuartalan/   Bank Tabungan                         Series B
                                                        10 Oktober/October, 2025                     Quaterly        Negara
       Seri C                                15,000    10 Oktober/October, 2018 -         9.10%                                                         Series C
                                                        10 Oktober/October, 2028
       Seri D                                50,000    10 Oktober/October, 2018 -         9.65%                                                         Series D
                                                        10 Oktober/October, 2023
       Subtotal                            110,000
                                                 0
    Obligasi Berkelanjutan III                                                                                                          Shelf Registration Bonds III
      PLN Tahap I Tahun 2018                                                                                                                   PLN I Year 2018
      Seri A                                               10 Juli/July, 2018 -           7.80%                                                         Series A
                                                            10 Juli/July, 2023
       Seri B                              442,000         10 Juli/July, 2018 -           8.35%                                                         Series B
                                                            10 Juli/July, 2025
       Seri C                              138,000         10 Juli/July, 2018 -           8.40%      Kuartalan/   Bank Tabungan                         Series C
                                                            10 Juli/July, 2028                       Quaterly        Negara
       Seri D                              281,000         10 Juli/July, 2018 -           8.90%                                                         Series D
                                                            10 Juli/July, 2033
       Seri E                              339,000         10 Juli/July, 2018 -           9.00%                                                         Series E
                                                            10 Juli/July, 2038
       Subtotal                           1,200,000
                                                  0
    Sukuk Ijarah Berkelanjutan III                                                                                                Shelf Registration Sukuk Ijarah III
      PLN Tahap I Tahun 2018                                                                                                                   PLN I Year 2018
      Seri A                                               10 Juli/July, 2018 -           7.80%                                                        Series A
                                                            10 Juli/July, 2023
       Seri B                              150,000         10 Juli/July, 2018 -           8.35%                                                         Series B
                                                            10 Juli/July, 2025
       Seri C                              258,000         10 Juli/July, 2018 -           8.40%      Kuartalan/   Bank Tabungan                         Series C
                                                            10 Juli/July, 2028                       Quaterly        Negara
       Seri D                              105,000         10 Juli/July, 2018 -           8.90%                                                         Series D
                                                            10 Juli/July, 2033
       Seri E                              110,000         10 Juli/July, 2018 -           9.00%                                                         Series E
                                                            10 Juli/July, 2038
       Subtotal                            623,000
                                                 0
    Obligasi Berkelanjutan II                                                                                                           Shelf Registration Bonds II
      PLN Tahap III Tahun 2018                                                                                                                PLN III Year 2018
      Seri A                                           22 Februari/February, 2018 -       6.50%                                                        Series A
                                                        22 Februari/February, 2023
       Seri B                                          22 Februari/February, 2018 -       6.80%                                                         Series B
                                                        22 Februari/February, 2025
       Seri C                              341,000     22 Februari/February, 2018 -       7.25%      Kuartalan/   Bank Tabungan                         Series C
                                                        22 Februari/February, 2028                   Quaterly        Negara
       Seri D                              362,000     22 Februari/February, 2018 -       8.20%                                                         Series D
                                                        22 Februari/February, 2033
       Seri E                             1,365,000    22 Februari/February, 2018 -       8.75%                                                         Series E
                                                        22 Februari/February, 2038
       Subtotal                           2,068,000
Page 125
                        PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                     DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                         Lampiran 5/115 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                              NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                     FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                                JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                            (Expressed in millions of Rupiah, unless otherwise stated)

28. UTANG OBLIGASI                  DAN       SUKUK           IJARAH                28. BONDS PAYABLE AND SUKUK IJARA (continued)
    (lanjutan)

    Obligasi dan sukuk ijarah (lanjutan)                                                 Bonds and sukuk ijara (continued)

                                                                                       Tingkat kupon/   Periode
                                                                                       Imbalan ijarah pembayaran
                                                                                         per tahun/      bunga/
                                                                                        Coupun rate/    Interest
                                      Pokok/                Periode pinjaman/             Ijara fee    payment     Wali amanat/
                                     Principal                  Loan term                per annum       period      Trustee

                                                  0
                                                  0
    Sukuk Ijarah Berkelanjutan II                                                                                                  Shelf Registration Sukuk Ijarah II
      PLN Tahap III Tahun 2018                                                                                                                PLN III Year 2018
      Seri A                                            22 Februari/February, 2018 -       6.50%                                                        Series A
                                                         22 Februari/February, 2023
       Seri B                               88,000      22 Februari/February, 2018 -       7.25%      Kuartalan/   Bank Tabungan                        Series B
                                                         22 Februari/February, 2028                   Quaterly        Negara
       Seri C                               57,500      22 Februari/February, 2018 -       8.20%                                                        Series C
                                                         22 Februari/February, 2033
       Seri D                              449,000      22 Februari/February, 2018 -       8.75%                                                        Series C
                                                         22 Februari/February, 2038
       Subtotal                            594,500
                                                 0
    Obligasi Berkelanjutan II                                                                                                           Shelf Registration Bonds II
      PLN Tahap II Tahun 2017                                                                                                                  PLN II Year 2017
      Seri B                                                3 November 2017 -              7.50%      Kuartalan/   Bank Tabungan                        Series B
                                                             3 November 2024                          Quaterly        Negara
       Seri C                              800,000          3 November 2017 -              8.20%                                                        Series C
                                                             3 November 2027
       Seri D                             1,093,000         3 November 2017 -              8.70%                                                        Series D
                                                             3 November 2032
       Subtotal                           1,893,000
                                                  0
    Sukuk Ijarah Berkelanjutan II                                                                                                  Shelf Registration Sukuk Ijarah II
      PLN Tahap II Tahun 2017                                                                                                                  PLN II Year 2017
      Seri B                               121,000          3 November 2017 -              8.20%      Kuartalan/   Bank Tabungan
                                                             3 November 2027                          Quaterly        Negara                            Series B
       Seri C                              490,000          3 November 2017 -              8.70%
                                                             3 November 2032                                                                            Series C
       Subtotal                            611,000
                                                 0
    Obligasi Berkelanjutan II                                                                                                           Shelf Registration Bonds II
      PLN Tahap I Tahun 2017                                                                                                                   PLN I Year 2017
      Seri B                                                11 Juli/July , 2017 -          8,10%      Kuartalan/   Bank Tabungan                        Series B
                                                             11 Juli/July , 2024                      Quaterly        Negara
       Seri C                             1,217,000         11 Juli/July , 2017 -          8,50%                                                        Series C
                                                             11 Juli/July , 2027
       Subtotal                           1,217,000
                                                  --
    Sukuk Ijarah Berkelanjutan II                                                                                                  Shelf Registration Sukuk Ijarah II
      PLN Tahap I Tahun 2017                                                                                                                    PLN I Year 2017
      Seri B                                214,000         11 Juli/July , 2017 -          8.50%                                                        Series B
                                                  --         11 Juli/July , 2027
    Obligasi Berkelanjutan I                                                                                                             Shelf Registration Bonds I
      PLN Tahap II Tahun 2013                                                                                                                  PLN II Year 2013
      Seri B                                           10 Desember/December, 2013 -        9,60%      Kuartalan/    Bank Permata                       Series B
                                                        10 Desember/December, 2023                    Quaterly
    Sukuk Ijarah Berkelanjutan I                                                                                                   Shelf Registration Sukuk Ijarah I
      PLN Tahap II Tahun 2013                                                                                                                 PLN II Year 2013
      Seri B                                           10 Desember/December, 2013 -        9.60%      Kuartalan/    Bank Permata                       Series B
                                                        10 Desember/December, 2023                    Quaterly
    Obligasi Berkelanjutan I                                                                                                             Shelf Registration Bonds I
      PLN Tahap I Tahun 2013                                                                                                                   PLN I Year 2013
      Seri B                                      --         5 Juli/July, 2013 -           8,25%      Kuartalan/    Bank Permata                       Series B
                                                              5 Juli/July, 2023                       Quaterly


    Jumlah/Total                        23,087,400



    Seluruh obligasi ini tidak dijamin secara khusus, namun                              The bonds are not secured by specific collateral but are
    dijamin dengan seluruh aset Perusahaan, serta hak                                    secured by all of the Company’s assets and the
    pemegang obligasi adalah pari passu tanpa hak                                        bondholders’ rights are pari passu without preference to
    khusus dengan hak-hak kreditur lain.                                                 other creditors.

    Perusahaan    telah    memenuhi       pembatasan-                                    The Company has complied with the restrictions specified
    pembatasan yang ditentukan dalam perjanjian Wali                                     within the agreements with the acting Trustee of the
    Amanat masing-masing obligasi dan sukuk ijarah.                                      corresponding bonds and sukuk ijara.

    Dana yang diperoleh dari penerbitan obligasi dan                                     The proceeds from the issuance of bonds payable and
    sukuk ijarah digunakan untuk mendanai proyek                                         sukuk ijarah are used to finance the transmission project,
    transmisi, proyek distribusi, dan modal kerja.                                       distribution project, and working capital.

    Rincian peringkat untuk seluruh obligasi dan Sukuk                                   Rating details on all outstanding bonds and Sukuk Ijara
    Ijarah yang dimiliki Perusahaan adalah sebagai berikut:                              bonds issued by the Company are as follows:
Page 126
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                       Lampiran 5/116 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                              NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                     FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)            (Expressed in millions of Rupiah, unless otherwise stated)

28. UTANG OBLIGASI                  DAN       SUKUK        IJARAH   28. BONDS PAYABLE AND SUKUK IJARA (continued)
    (lanjutan)

    Obligasi dan sukuk ijarah (lanjutan)                                Bonds and sukuk ijara (continued)

    Rincian peringkat untuk seluruh obligasi dan Sukuk                  Rating details on all outstanding bonds and Sukuk Ijara
    Ijarah yang dimiliki Perusahaan adalah sebagai berikut:             bonds issued by the Company are as follows: (continued)
    (lanjutan)
                                                                                         30 Juni/June 30, 2025
                                                                            Peringkat/                      Lembaga pemeringkat/
                                                                             Rating                            Rating agency

    Obligasi/Bonds (lanjutan/continued)

    Obligasi/Bonds idAAA (lanjutan/continued)

    Obligasi Berkelanjutan II PLN Tahap I Tahun 2017/
    Shelf Registration Bonds II PLN Phase I Year 2017                         idAAA                   PT Pemeringkat Efek Indonesia
    Obligasi Berkelanjutan II PLN Tahap II Tahun 2017/
    Shelf Registration Bonds II PLN Phase II Year 2017                        idAAA                   PT Pemeringkat Efek Indonesia
    Obligasi Berkelanjutan II PLN Tahap III Tahun 2018/
    Shelf Registration Bonds II PLN Phase III Year 2018                       idAAA                   PT Pemeringkat Efek Indonesia
    Obligasi Berkelanjutan III PLN Tahap I Tahun 2018/
    Shelf Registration Bonds III PLN Phase I Year 2018                        idAAA                   PT Pemeringkat Efek Indonesia
    Obligasi Berkelanjutan III PLN Tahap II Tahun 2018/
    Shelf Registration Bonds III PLN Phase II Year 2018                       idAAA                   PT Pemeringkat Efek Indonesia
    Obligasi Berkelanjutan III PLN Tahap III Tahun 2019/
    Shelf Registration Bonds III PLN Phase III Year 2019                      idAAA                   PT Pemeringkat Efek Indonesia
    Obligasi Berkelanjutan III PLN Tahap IV Tahun 2019/
    Shelf Registration Bonds III PLN Phase IV Year 2019                       idAAA                   PT Pemeringkat Efek Indonesia
    Obligasi Berkelanjutan III PLN Tahap V Tahun 2019/
    Shelf Registration Bonds III PLN Phase V Year 2019                        idAAA                   PT Pemeringkat Efek Indonesia
    Obligasi Berkelanjutan III PLN Tahap VI Tahun 2020/
    Shelf Registration Bonds III PLN Phase VI Year 2020                       idAAA                   PT Pemeringkat Efek Indonesia
    Obligasi Berkelanjutan III PLN Tahap VII Tahun 2020/
    Shelf Registration Bonds III PLN Phase VII Year 2020                      idAAA                   PT Pemeringkat Efek Indonesia
    Obligasi Berkelanjutan IV PLN Tahap I Tahun 2020/
    Shelf Registration Bonds IV PLN Phase I Year 2020                         idAAA                  PT Pemeringkat Efek Indonesia

     Sukuk Ijarah/Sukuk Ijara idAAA

     Sukuk Ijarah Berkelanjutan II PLN Tahap I Tahun 2017/
     Shelf Registration Sukuk Ijara II PLN Phase I Year 2017                idAAA(sy)                 PT Pemeringkat Efek Indonesia
     Sukuk Ijarah Berkelanjutan II PLN Tahap II Tahun 2017/
     Shelf Registration Sukuk Ijara II PLN Phase II Year 2017               idAAA(sy)                 PT Pemeringkat Efek Indonesia
     Sukuk Ijarah Berkelanjutan II PLN Tahap III Tahun 2018/
     Shelf Registration Sukuk Ijara II PLN Phase III Year 2018              idAAA(sy)                 PT Pemeringkat Efek Indonesia
     Sukuk Ijarah Berkelanjutan III PLN Tahap I Tahun 2018/
     Shelf Registration Sukuk Ijara III PLN Phase I Year 2018               idAAA(sy)                 PT Pemeringkat Efek Indonesia
     Sukuk Ijarah Berkelanjutan III PLN Tahap II Tahun 2018/
     Shelf Registration Sukuk Ijara III PLN Phase II Year 2018              idAAA(sy)                 PT Pemeringkat Efek Indonesia
     Sukuk Ijarah Berkelanjutan III PLN Tahap III Tahun 2019/
     Shelf Registration Sukuk Ijara III PLN Phase III Year 2019             idAAA(sy)                 PT Pemeringkat Efek Indonesia
     Sukuk Ijarah Berkelanjutan III PLN Tahap IV Tahun 2019/
     Shelf Registration Sukuk Ijara III PLN Phase IV Year 2019              idAAA(sy)                 PT Pemeringkat Efek Indonesia
     Sukuk Ijarah Berkelanjutan III PLN Tahap V Tahun 2019/
     Shelf Registration Sukuk Ijara III PLN Phase V Year 2019               idAAA(sy)                 PT Pemeringkat Efek Indonesia
     Sukuk Ijarah Berkelanjutan III PLN Tahap VI Tahun 2020/
     Shelf Registration Sukuk Ijara III PLN Phase VI Year 2020              idAAA(sy)                 PT Pemeringkat Efek Indonesia
     Sukuk Ijarah Berkelanjutan IV PLN Tahap I Tahun 2020/
     Shelf Registration Sukuk Ijara IV PLN Phase I Year 2020                idAAA(sy)                 PT Pemeringkat Efek Indonesia
Page 127
                      PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                   DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                   Lampiran 5/117 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                  NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                         FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                    JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                (Expressed in millions of Rupiah, unless otherwise stated)

28. UTANG OBLIGASI             DAN           SUKUK      IJARAH         28. BONDS PAYABLE AND SUKUK IJARA (continued)
    (lanjutan)

    Surat Utang Jangka Menengah Global dan                                   Global Medium-Term Notes and Guaranteed
    Obligasi Terjamin                                                        Notes

    Rincian Surat Utang Jangka Menengah Global dan                           The details of Global Medium-term Notes and
    Obligasi Terjamin dalam Dolar Amerika pada                               Guaranteed Notes as at June 30, 2025 in US Dollars
    tanggal 30 Juni 2025 adalah sebagai berikut:                             are as follows:
                                                    Harga                                      Tingkat
                                Pokok/            penerbitan/       Periode pinjaman/           bunga/          Wali amanat/
                              Principal *)       Issuing price         Loan Term             Interest rate       Trustee
                                  USD
     Surat utang                                                                                                                        Global medium
        jangka menengah                                                                                                            global term notes
     Penerbitan tahun 2020                                                                                                                Issued in 2020
     Jatuh tempo 2030           500,000,000        99.146%          30 Juni/June 2020 -       3.0000%        Deutsche Bank Trust             Due in 2030
                                                                     30 Juni/June 2030                       Company Americas
     Jatuh tempo 2050          1,000,000,000       98.283%          30 Juni/June 2020 -       4.0000%                                       Due in 2050
                                                                     30 Juni/June 2050
     Subjumlah                 1,500,000,000                                                                                                      Total
     Penerbitan tahun 2019                                                                                                               Issued in 2019
     Jatuh tempo 2029           700,000,000        99.385%          17 Juli/July 2019 -        3.8750%       Deutsche Bank Trust            Due in 2029
                                                                     17 Juli/July 2029                       Company Americas
     Jatuh tempo 2049           700,000,000        98.834%          17 Juli/July 2019 -        4.8750%                                      Due in 2049
                                                                     17 Juli/July 2049
     Jatuh tempo 2030           500,000,000        99.775%          5 November 2019 -          3.3750%       Deutsche Bank Trust            Due in 2030
                                                                 5 Februari/February 2030                    Company Americas
     Jatuh tempo 2050           500,000,000        99.567%          5 November 2019 -          4.3750%                                      Due in 2050
                                                                 5 Februari/February 2050
     Subjumlah                 2,400,000,000                                                                                                      Total
     Penerbitan tahun 2018                                                                                                               Issued in 2018
     Jatuh tempo 2028          1,000,000,000       99.619%           21 Mei/May 2018 -         5.4500%       Deutsche Bank Trust            Due in 2028
                                                                      21 Mei/May 2028                        Company Americas
     Jatuh tempo 2029           500,000,000        99.004%       25 Oktober/October 2018 -     5.3750%                                      Due in 2029
                                                                  25 Januari/January 2029
     Jatuh tempo 2048          1,000,000,000        99.32%           21 Mei/May 2018 -         6.1500%       Deutsche Bank Trust            Due in 2048
                                                                      21 Mei/May 2048                        Company Americas
     Jatuh tempo 2049           500,000,000        99.293%       25 Oktober/October 2018 -     6.2500%                                      Due in 2049
                                                                  25 Oktober/October 2049
     Subjumlah                 3,000,000,000                                                                                                   Total

     Penerbitan tahun 2017                                                                                                               Issued in 2017
     Jatuh tempo 2027          1,500,000,000       98.990%          15 Mei/May 2017 -          4.125%        Deutsche Bank Trust            Due in 2027
                                                                     15 Mei/May 2027                         Company Americas
     Jatuh tempo 2047           500,000,000        98.514%          15 Mei/May 2017 -           5.25%                                       Due in 2047
                                                                     15 Mei/May 2047
     Subjumlah                 2,000,000,000                                                                                                   Total

     Penerbitan tahun 2012                                                                                                               Issued in 2012
     Jatuh tempo 2042          1,000,000,000       98,514%       24 Oktober/October 2012 -      5,25%        Deutsche Bank Trust            Due in 2042
                                                                  24 Oktober/October 2042                    Company Americas
     Penerbitan tahun 2011                                                                                                               Issued in 2011
     Jatuh tempo 2021                        0     99,054%          22 November 2011 -          5,50%        Deutsche Bank Trust            Due in 2021
                                                                     22 November 2021                        Company Americas
     Obligasi terjamin                                                                                                               Guaranteed notes
     Penerbitan tahun 2007                                                                                                              Issued in 2007
     Jatuh tempo 2037           288,312,000        98,586%          29 Juni/June 2007 -        7,875%        Deutsche Bank Trust           Due in 2037
                                                                     29 Juni/June 2037                       Company Americas
     Jumlah                   10,188,312,000                                                                                                       Total



   *) dalam jumlah penuh                                                                                                                 *) in full amount
Page 128
                     PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                  DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                  Lampiran 5/118 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                 NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                        FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                   JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)               (Expressed in millions of Rupiah, unless otherwise stated)

28. UTANG OBLIGASI            DAN            SUKUK     IJARAH          28. BONDS PAYABLE AND SUKUK IJARA (continued)
    (lanjutan)

    Surat Utang Jangka Menengah Global dan                                   Global Medium-Term Notes and Guaranteed
    Obligasi Terjamin (lanjutan)                                             Notes (continued)

    Rincian Surat Utang Jangka Menengah Global                               The details of Global Medium-Term Notes in Euro as
    dalam Euro pada tanggal 30 Juni 2025 adalah                              at June 30, 2025 are as follows:
    sebagai berikut:
                                                   Harga                                       Tingkat
                                Pokok/           penerbitan/        Periode pinjaman/           bunga/           Wali amanat/
                              Principal *)      Issuing price          Loan Term             Interest rate        Trustee
                                  EUR
      Surat utang                                                                                                                        Global medium
         jangka menengah                                                                                                            global term notes
      Penerbitan tahun 2019                                                                                                                Issued in 2019
      Jatuh tempo 2031          500,000,000       99.416%           5 November 2019 -          1.875%         Deutsche Bank Trust             Due in 2031
                                                                     5 November 2031                          Company Americas
      Penerbitan tahun 2018                                                                                                               Issued in 2018
      Jatuh tempo 2025          500,000,000       99.221%        25 Oktober/October 2018 -     2.875%         Deutsche Bank Trust            Due in 2025
                                                                  25 Oktober/October 2025                     Company Americas
      Jumlah                  1,000,000,000                                                                                                          Total

    *) dalam jumlah penuh                                                                                                                   *) in full amount


    Rincian Surat Utang Jangka Menengah Global                               The details of Global Medium-Term Notes in
    dalam Yen Jepang pada tanggal 30 Juni 2025                               Japanese Yen as at June 30, 2025 are as follows:
    adalah sebagai berikut:

                                                    Harga                                       Tingkat
                                Pokok/            penerbitan/        Periode pinjaman/           bunga/           Wali amanat/
                              Principal *)       Issuing price          Loan Term             Interest rate        Trustee
                                  JPY
      Surat utang                                                                                                                          Global medium
        jangka menengah                                                                                                               global term notes
      Penerbitan tahun 2019                                                                                                                  Issued in 2019
        Jatuh tempo 2024                             100%           20 September 2019 -          0.870%                                         Due in 2024
                                                                     20 September 2024
        Jatuh tempo 2029      1,000,000,000          100%           20 September 2019 -          1.050%                                         Due in 2029
                                                                     20 September 2029
      Jumlah                  1,000,000,000          JPY                                                                                               Total

    *) dalam jumlah penuh                                                                                                                   *) in full amount


    Perusahaan memenuhi pembatasan-pembatasan                                The Company complied with the restrictions specified
    yang ditentukan dalam perjanjian Wali Amanat.                            within the agreements with the acting Trustee.



    Dana yang diperoleh dari penerbitan Surat Utang                          The proceeds from the Global Medium-Term Notes
    Jangka Menengah Global dan Obligasi Terjamin ini                         and Guaranteed Notes issued were used to fund the
    digunakan untuk mendanai kebutuhan investasi                             capital expenditure requirements in connection with
    program percepatan pembangunan fasilitas tenaga                          the fast track program, regular construction and for
    listrik, konstruksi rutin, dan untuk tujuan umum                         general corporate purposes.
    korporasi.
Page 129
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                             Lampiran 5/119 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                               FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                          JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)      (Expressed in millions of Rupiah, unless otherwise stated)

28. UTANG OBLIGASI             DAN     SUKUK     IJARAH       28. BONDS PAYABLE AND SUKUK IJARA (continued)
    (lanjutan)

    Surat Utang Jangka Menengah Global dan                         Global Medium-Term Notes and Guaranteed
    Obligasi Terjamin (lanjutan)                                   Notes (continued)

    Rincian peringkat untuk seluruh surat utang jangka             Rating details on all outstanding global medium-term
    menengah global, obligasi terjamin, dan Japanese               notes, guaranteed notes, and the Japanese Yen bond
    Yen bond yang dimiliki Perusahaan adalah sebagai               owned by the Company are as follows:
    berikut:

                                                                       Lembaga pemeringkat/Rating agency
                                               Moody’s Investor          Standard and                         Japan Credit
                                                Service, Inc.,              Poor’s           Fitch               Rating

    Surat utang jangka menengah global
    dalam Dollar Amerika/
    Global medium-term notes in US Dollars
    Penerbitan tahun 2020/Issued in 2020            Baa2                    BBB                BBB                n/a
    Penerbitan tahun 2019/Issued in 2019            Baa2                    BBB                BBB                n/a
    Penerbitan tahun 2018/Issued in 2018            Baa2                    n/a                BBB                n/a
    Penerbitan tahun 2017/Issued in 2017            Baa2                    n/a                BBB                n/a
    Penerbitan tahun 2012/Issued in 2012            Baa2                    BBB                BBB                n/a

    Surat utang jangka menengah global
    dalam Euro/
    Global medium-term notes in Euro
    Penerbitan tahun 2019/Issued in 2019            Baa2                    BBB                BBB                n/a
    Penerbitan tahun 2018/Issued in 2018            Baa2                    n/a                BBB                n/a

    Obligasi terjamin/Guaranteed notes
    Penerbitan tahun 2007/Issued in 2007            Baa2                    BBB                BBB                n/a

    Obligasi dalam Yen Jepang/
    Japanese Yen Bond
    Penerbitan tahun 2019/Issued in 2019            Baa2                    BBB                n/a               BBB+

29. UTANG LISTRIK SWASTA                                      29. ELECTRICITY PURCHASE PAYABLES

    Akun ini merupakan utang listrik swasta yang                   This account represents electricity purchase
    direstrukturisasi melalui renegosiasi dengan IPP.              payables, which were restructured through
                                                                   renegotiation with the IPPs.

    Rincian berdasarkan pemasok dan jadwal                         Details according to creditors and payment schedules
    pembayaran pokok adalah sebagai berikut:                       are as follows:

    a.   Berdasarkan kreditur                                      a.     By creditor


                                                            30 Juni/            31 Desember/
                                                            June 30,            December 31,
                                                              2025                  2024

          PT Paiton Energy                                                                                  PT Paiton Energy
            2025: USD270.378.636                                                                     2025: USD270,378,636
            2024: USD287.630.378                             4,388,516            4,647,244          2024: USD287,630,378
          PT Jawa Power                                                                                      PT Jawa Power
            2025: USD41.268.452                                                                       2025: USD41,268,452
            2024: USD42.779.578                                669,828              691,190           2024: USD42,779,578

          Jumlah                                             5,058,344            5,338,434                             Total

          Dikurangi: bagian jangka pendek                      636,939              615,418            Less: current portion

          Bagian jangka panjang                              4,421,405            4,723,016                Long-term portion
Page 130
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                  Lampiran 5/120 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                              NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                     FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)            (Expressed in millions of Rupiah, unless otherwise stated)

29. UTANG LISTRIK SWASTA (lanjutan)                                 29. ELECTRICITY PURCHASE PAYABLES (continued)

    b.   Berdasarkan jadwal pembayaran                                  b.    By instalment schedule

                                                       30 Juni/                 31 Desember/
                                                       June 30,                 December 31,
                                                         2025                       2024
         Dibayarkan:                                                                                                          Payable in:
         Dalam satu tahun                                  636,939                         615,418                       Within one year
         Pada tahun kedua                                  676,820                         653,457                   In the second year
         Pada tahun ketiga                                 720,380                         694,926                       In the third year
         Pada tahun keempat                                768,144                         740,309                     In the fourth year
         Setelah tahun kelima                            2,256,061                       2,634,324                        After five years

         Jumlah                                          5,058,344                       5,338,434                                 Total


    Utang kepada PT Paiton Energy dan PT Jawa                           Payables to PT Paiton Energy and PT Jawa Power
    Power dikenakan bunga sebesar 4,81% dan                             bear annual interest of 4.81% and 18.45%, and are
    18,45% yang dibayar dalam 360 kali angsuran                         payable in 360 monthly installments from January 1,
    bulanan sejak 1 Januari 2002 sampai dengan 1                        2002 until December 1, 2031.
    Desember 2031.

30. UTANG USAHA                                                     30. TRADE PAYABLES

    Akun ini merupakan liabilitas sehubungan dengan                     This account represents payables arising from
    pembelian tenaga listrik, bahan bakar, barang dan                   purchases of electricity, fuel, goods and services.
    jasa.
    Rincian utang usaha adalah sebagai berikut:                         Details of trade payables are as follows:

                                                         30 Juni/             31 Desember/
                                                         June 30,             December 31,
                                                           2025                   2024

     Pihak berelasi                                                                                                      Related parties
     Pembelian bahan bakar, barang dan jasa              26,112,690              16,146,028          Purchase of fuel, goods and service
     Pembelian tenaga listrik                             7,808,614               6,566,473                      Purschase of electricity
     Subjumlah                                           33,921,304              22,712,501                                     Subtotal

     Pihak ketiga                                                                                                          Third parties
     Pembelian bahan bakar, barang dan jasa              26,983,426              23,230,993          Purchase of fuel, goods and service
     Pembelian tenaga listrik                            24,250,550              24,754,325                      Purschase of electricity

     Subjumlah                                           51,233,976              47,985,318                                        Subtotal

     Jumlah                                              85,155,280              70,697,819                                             Total

    Rincian utang usaha berdasarkan mata uang                           Details of trade payables by currency are as follows:
    adalah sebagai berikut:

                                  30 Juni/June 30, 2025                        31 Desember/December 31,2024
                           Dalam mata                                          Dalam mata
                          uang original/                                      uang original/
                            In original        Ekuivalen Rp/                    In original      Ekuivalen Rp/
                          currencies *)        Rp equivalent                  currencies *)      Rp equivalent

    Rupiah                     59,291,705               59,291,705                  44,465,780                44,465,780           Rupiah
    USD                     1,575,162,440               25,566,462               1,607,318,970                25,969,452             USD
    Lain-lain **)              18,305,324                  297,113                  16,252,219                   262,587         Others **)

    Jumlah                                              85,155,280                                            70,697,819                Total

    *) Dalam jumlah penuh, kecuali Rupiah                                *)   In full amount, except for Rupiah
   **) Utang usaha dalam mata uang lainnya disajikan dalam              **)   Trade payables in other currencies are presented in USD
       jumlah setara USD, menggunakan kurs tanggal pelaporan                  equivalents using the exchange rate prevailing at the
                                                                              reporting date
Page 131
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                             Lampiran 5/121 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                         NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                           JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)       (Expressed in millions of Rupiah, unless otherwise stated)


30. UTANG USAHA (lanjutan)                                     30. TRADE PAYABLES (continued)

    Lihat Catatan 51 untuk informasi rincian                       Refer to Note 51 for information on the details of
    transaksi dan saldo dengan pihak berelasi.                     transactions and balances with related parties.


31. UTANG LAIN-LAIN                                            31. OTHER PAYABLES


                                                30 Juni/               31 Desember/
                                                June 30,               December 31,
                                                  2025                     2024

                                                                                               Acquisition of property, plant
    Perolehan aset tetap dan pekerjaan                                                                   and equipmentand
      dalam pelaksanaan                                                                           construction in progress
    Rupiah                                         5,587,568                  5,340,378                              Rupiah
    USD                                              985,713                    806,130                                 USD
    EUR                                              704,511                    709,867                                 EUR
    JPY                                              224,996                    206,501                                 JPY
    Pemerintah daerah                              3,176,537                  3,180,744                  Local government
    Karyawan                                         191,039                    160,461                          Employees
    Lain-lain                                      1,017,453                    954,646                              Others
    Jumlah                                        11,887,817                 11,358,727                                Total

    Dikurangi : bagian jangka pendek              11,345,225                 10,925,073            Less : current portion

    Bagian jangka panjang                            542,592                    433,655               Non-current portion



    Pemerintah Daerah                                             Local Government

    Utang kepada Pemerintah Daerah merupakan                      The payables to Local Government represent the
    jumlah yang ditagih Perusahaan dari pelanggan                 amount collected by the Company from the customers
    untuk pajak penerangan jalan umum. Selanjutnya                for street lighting taxes. This is subsequently remitted
    jumlah yang dipungut akan diteruskan kepada                   to the respective Local Government.
    Pemerintah Daerah.


    Karyawan                                                      Employees

    Utang kepada karyawan terutama merupakan                      Payable to employees mainly represents receipt of
    penerimaan di muka atas cicilan penjualan rumah               advance instalment payments from employees related
    dinas.                                                        to house instalments.

    Lihat Catatan 51 untuk informasi rincian transaksi            Refer to Note 51 for information on the details of
    dan saldo dengan pihak berelasi.                              transactions and balances with related parties.
Page 132
                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                               Lampiran 5/122 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                           NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                  FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                             JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)         (Expressed in millions of Rupiah, unless otherwise stated)

32. UTANG PAJAK                                                   32. TAXES PAYABLE
                                                 30 Juni/              31 Desember/
                                                 June 30,              December 31,
                                                   2025                    2024
    Pajak Penghasilan Badan                                                                                    Corporate income taxes
    Pasal 29                                      2,434,232                   2,672,130                                        Article 29
    Pajak lain-lain                                                                                                         Other taxes
    PPN                                           1,835,223                     881,243                                              VAT
    Pajak penghasilan                                                                                                     Income taxes
     Pasal 21                                     1,480,189                   1,211,552                                    Article 21
     Pasal 22                                       837,307                     145,392                                    Article 22
     Pasal 23 dan 26                                122,387                     250,870                             Article 23 and 26
     Pasal 4 (2)                                    108,056                      94,760                                    Article 4 (2)
     Pasal 15                                        55,700                      41,936                                     Article 15
    Lain-lain                                       139,730                        3,994                                         Others


    Subjumlah                                     4,578,592                   2,629,747                                        Subtotal

    Jumlah                                        7,012,825                   5,301,877                                            Total


33. BIAYA MASIH HARUS DIBAYAR                                     33. ACCRUED EXPENSES
                                                     30 Juni/               31 Desember/
                                                     June 30,               December 31,
                                                       2025                     2024

     Bunga dan beban keuangan                                                                            Interest and financing charges
     Pihak berelasi                                                                                                      Related parties
     Utang bank                                             456,591                 419,755                                  Bank loans
     Utang penerusan pinjaman                               266,894                 303,559                              Two-step loans
     Utang kepada pemerintah dan lembaga                                                                     Government and non bank
       keuangan pemerintah non bank                           1,757                    2,008       government financial institution loans

     Jumlah pihak berelasi                                  725,242                 725,322                           Total related parties
     Pihak ketiga                                                                                                             Third parties
     Utang obligasi dan sukuk ijarah                   2,432,755                  2,196,944               Bonds payable and sukuk ijara
     Utang bank                                          813,843                    700,978                                    Bank loans
     Utang bunga sewa                                    221,825                    506,461                         Lease liability interest
     Utang listrik swasta                                 38,126                     18,833                Electricity purchase payables

     Jumlah pihak ketiga                               3,506,549                  3,423,216                              Total third parties

     Subjumlah                                         4,231,791                  4,148,538                                       Subtotal

     Biaya operasional                                 5,542,668                  6,347,360                         Operational charges

     Jumlah                                            9,774,459                 10,495,898                                           Total

    Rincian biaya masih harus dibayar berdasarkan                     Details of accrued expenses by currency are as
    mata uang adalah sebagai berikut:                                 follows
                                   30 Juni/June 30, 2025                     31 Desember/December 31,2024
                            Dalam mata                                       Dalam mata
                           uang original/                                   uang original/
                             In original        Ekuivalen Rp/                 In original      Ekuivalen Rp/
                           currencies *)        Rp equivalent               currencies *)      Rp equivalent

    Rupiah                      6,593,880             6,593,880                    7,276,114                    7,276,114            Rupiah
    USD                       150,570,720             2,443,913                  151,766,337                    2,452,089              USD
    JPY                     2,819,442,798               317,502                5,619,522,435                      581,216              JPY
    EUR                        22,024,551               419,164                   11,085,006                      186,479              EUR

    Jumlah                                            9,774,459                                                10,495,898              Total
     *) Dalam jumlah penuh, kecuali Rupiah                            *)   In full amount, except for Rupiah
Page 133
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                             Lampiran 5/123 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                               FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                          JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)      (Expressed in millions of Rupiah, unless otherwise stated)

33. BIAYA MASIH HARUS DIBAYAR (lanjutan)                     33. ACCRUED EXPENSES (continued)

    Lihat Catatan 51 untuk informasi rincian transaksi            Refer to Note 51 for information on the details of
    dan saldo dengan pihak berelasi.                              transactions and balances with related parties.

34. UANG JAMINAN LANGGANAN                                   34. CUSTOMER SECURITY DEPOSITS

    Akun ini merupakan uang jaminan langganan yang                This account represents customer security deposits
    ditentukan berdasarkan besar daya dan golongan                determined based on power supply and electricity
    tarif. Uang jaminan langganan akan dikembalikan               tariff. Customer security deposits will be refunded, net
    apabila pelanggan berhenti menjadi pelanggan,                 of unpaid electricity bills, upon discontinuation of
    dengan memperhitungkan rekening listrik belum                 customers’ subscriptions.
    dibayar.

35. UTANG BIAYA PROYEK                                       35. PROJECT COST PAYABLES

    Akun ini merupakan utang kepada kontraktor atas               This account represents payables to contractors
    biaya dan pengadaan material untuk konstruksi.                arising from expenses and material purchases for
    Akun ini akan direklasifikasi ke akun penerusan               construction. This account will be reclassified into the
    pinjaman pada saat penerbitan Withdrawal                      two-step loans account at the issuance of the
    Authorisation atau dokumen lain yang sejenis.                 Withdrawal Authorisation or other similar documents.

                                                30 Juni/            31 Desember/
                                                June 30,            December 31,
                                                  2025                  2024

    Nama Proyek                                                                                             Project Name
    PLTU Kalselteng 2 (2x100 MW)                                                             PLTU Kalselteng 2 (2x100 MW)
    Lain-lain                                    1,591,433               1,680,636                                  Others

    Jumlah                                       1,591,433               1,680,636                                       Total


36. PENJUALAN TENAGA LISTRIK                                 36. SALES OF ELECTRICITY

    Penjualan tenaga listrik berdasarkan pelanggan                Sales of electricity by customer are as follows:
    adalah sebagai berikut:

                                                     2025                   2024
                                                (Enam Bulan/            (Enam Bulan/
                                                 Six Months)             Six Months

     Pihak berelasi (catatan 51)                                                                 Related parties (note 51)
     Entitas yang berhubungan dengan                                                                       Related parties
       pemerintah                                   11,192,413              11,087,001                         Bank loans


     Pihak ketiga                                                                                            Third parties
     Umum                                          167,368,375             159,661,092                              Public
     TNI dan Polri                                   1,017,982               1,053,867                       TNI and Polri

     Subjumlah                                     168,386,357             160,714,959                               Subtotal

     Jumlah                                                                                                             Total
                                                   179,578,770             171,801,960

     Jumlah, bersih                                179,578,770             171,801,960                          Total, net

    Pendapatan sebesar Rp179.578.770 (Juni 2024:                  Revenue amounting to Rp179,578,770 (June 2024:
    Rp171.801.960) diakui sepanjang waktu.                        Rp171,801,960) is recognised overtime.
Page 134
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                               Lampiran 5/124 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                          NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                 FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                            JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)        (Expressed in millions of Rupiah, unless otherwise stated)

36. PENJUALAN TENAGA LISTRIK (lanjutan)                         36. SALES OF ELECTRICITY (continued)

    Penjualan tenaga listrik untuk tahun 2025 dan 2024              Sales of electricity for the years 2025 and 2024 are
    didasarkan pada Tarif Dasar Listrik, yang ditetapkan            based on the Basic Electricity Tariff determined by the
    oleh Pemerintah dan Pemerintah Daerah, sebagai                  Government and Local Government as follows:
    berikut:

    •    Peraturan Menteri ESDM No. 28 Tahun 2016                   •    Regulation of the Ministry of ESDM No. 28 Year
         sebagaimana      terakhir  diubah    dengan                     2016 most recently amended by Regulation of
         Peraturan Menteri ESDM No. 3 Tahun 2020.                        the Ministry of ESDM No. 3 Year 2020.
    •    Peraturan Gubernur Kepulauan Riau No. 21                   •    Regulation of the Governor of Riau Islands No.
         Tahun 2017 tentang tarif tenaga listrik yang                    21 Year 2017, regarding the tariff of electricity
         disediakan oleh PLN Batam.                                      provided by PLN Batam.

    Tidak terdapat penyesuaian tarif sampai dengan 30               There is no electricity tariff adjustment until June 30,
    Juni 2025 untuk golongan pelanggan nonsubsidi                   2025 for other non-subsidy customers.
    lainnya.

    Pada periode 30 Juni 2025, total penjualan tenaga               For the periods ended on June 30, 2025, the total
    listrik termasuk kebijakan pemerintah berupa diskon             sales of electricity include government policy in the
    penjualan tenaga listrik bulan Januari dan Februari             form of discount electricity sales on January and
    2025 sebesar Rp13.615.792.                                      February 2025 amounted to Rp13,615,792.

    Grup tidak memiliki penjualan kepada pelanggan                  The Group has no single customer from which it
    dengan jumlah melebihi 10% dari total pendapatan                generates revenue of more than 10% of total revenue.
    usaha.

37. SUBSIDI LISTRIK PEMERINTAH                                  37. GOVERNMENT ELECTRICITY SUBSIDY

    Pendapatan subsidi merupakan pendapatan dari                    Subsidy revenue represents the revenue from the
    Pemerintah Indonesia atas selisih antara biaya yang             Government of Indonesia for the difference between
    diperbolehkan ditambah margin 7% dengan harga jual              allowable cost plus a 7% margin with actual sales
    aktual per masing-masing golongan tarif kecuali untuk           price for each tariff group except for tariff groups which
    golongan tarif yang telah mendapatkan penyesuaian               received automatic tariff adjustment based on Ministry
    tarif otomatis menurut Peraturan Menteri ESDM No. 3             of ESDM Regulation No. 3 Year 2020 regarding the
    Tahun 2020 tentang perubahan ke-4 atas Peraturan                fourth amendment of Ministry of ESDM Regulation
    Menteri ESDM No. 28 Tahun 2016 tentang tarif                    No. 28 Year 2016 regarding electricity tariff for
    tenaga listrik untuk listrik yang disediakan oleh PT            electricity provided by PT PLN (Persero).
    PLN (Persero).

    Pemerintah Republik Indonesia memberikan subsidi                The Government of the Republic of Indonesia
    listrik kepada pelanggan melalui Perusahaan. Tata               provides electricity subsidies to customers through
    cara penghitungan dan pembayaran subsidi listrik                the Company. The procedure for calculation and
    tahun anggaran 2025 menggunakan Peraturan                       payment of the electricity subsidy for budget years
    Menteri Keuangan RI No. 20 Tahun 2025 tanggal 5                 2025 uses Minister of Finance Regulation No. 20
    Maret 2025. Subsidi listrik dihitung dari selisih negatif       Year 2025 , dated March 5, 2025. The electricity
    antara harga jual tenaga listrik rata-rata (Rp/kWh) dari        subsidy is calculated from the negative difference
    masing-masing golongan tarif dikurangi biaya pokok              between the average sales prices (Rp/kWh) of each
    penyediaan tenaga listrik (Rp/kWh) di masing-masing             tariff group less the cost of electricity supplies
    golongan tarif dikalikan volume penjualan (kWh) untuk           (Rp/kWh) at each tariff group multiplied by the
    setiap golongan tarif. Biaya pokok penyediaan tenaga            electricity sales volume (kWh) for each tariff group.
    listrik dihitung berdasarkan formula yang ditetapkan            The cost of electricity supplies is computed based
    oleh Direktorat Jenderal Ketenagalistrikan, di bawah            on the formula determined by the Directorate
    Kementerian ESDM.                                               General of Electricity, under the Ministry of ESDM.

    Besarnya subsidi listrik dalam satu tahun anggaran              The amount of the electricity subsidy within a budget
    secara final ditetapkan berdasarkan hasil audit atas            year is finalised based on the result of the compliance
    ketaatan penggunaan subsidi listrik yang dilakukan              audit of the usage of the electricity subsidy performed
    oleh auditor yang ditunjuk Direktorat Jenderal                  by an auditor assigned by the Directorate General of
    Anggaran, di bawah Kementerian Keuangan.                        Budget      under     the    Ministry     of   Finance.
Page 135
                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                             Lampiran 5/125 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                         NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                           JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)       (Expressed in millions of Rupiah, unless otherwise stated)

37. SUBSIDI LISTRIK PEMERINTAH (lanjutan)                      37. GOVERNMENT             ELECTRICITY            SUBSIDY
                                                                   (continued)

    Pendapatan subsidi listrik dirinci selama tahun                The details of revenue from electricity subsidy during
    berjalan sebagai berikut:                                      the year are as follows:

                                                 2025                       2024
                                            (Enam Bulan/                (Enam Bulan/
                                             Six Months)                 Six Months

     Saldo Awal                                   5,839,850                   4,611,800                      Beginning balance
     Subsidi listrik (Catatan 51)                40,091,369                  37,266,626           Electricity subsidy (Note 51)
     Program diskon listrik                      13,615,792                           -           Electricity discount program

     Realisasi penerimaan subsidi tahun                                                                 Realization of subsidy
     anggaran berjalan:                                                                                  from current year:
     Penerimaan tunai                          (36,211,768)                (29,687,289)                        Cash received

                                                                                                  Receivables for electricity
     Piutang subsidi listrik (Catatan16)         23,335,243                  12,191,137                  subsidy (Note 16)



38. PENDAPATAN USAHA LAIN-LAIN                                 38. OTHER REVENUES

                                                  2025                    2024
                                             (Enam Bulan/             (Enam Bulan/
                                              Six Months)              Six Months

     Penjualan batubara                            2,417,940                 2,395,455                              Coal sales
     Jaringan dan jasa                             2,119,802                 1,882,390      Telecommunication network and
       telekomunikasi                                                                                                  service
     Jasa pemeliharaan                               695,304                  583,116                   Maintenance service
     Sewa transformator                              384,132                  321,900                     Transformer rental
     Perubahan daya tersambung dan                                                         Upgrading of electricity power and
       administrasi                                   23,333                   31,223                     administration fees
     Lain-lain                                       412,070                  474,234                                  Others

     Jumlah                                        6,052,581                 5,688,317                                  Total

    Lihat Catatan 51 untuk informasi rincian transaksi             Refer to Note 51 for information on the details of
    dan saldo dengan pihak berelasi.                               transactions and balances with related parties.

39. BEBAN BAHAN BAKAR DAN PELUMAS                              39. FUEL AND LUBRICANTS EXPENSE

                                                   2025                   2024
                                              (Enam Bulan/            (Enam Bulan/
                                               Six Months)             Six Months

     Bahan bakar minyak                                                                                                 Fuel
     High speed diesel                             20,235,883             21,046,855                       High speed diesel
     Fuel Marine Oil                                  837,114                786,317                          Fuel marine oil
     Lain - lain                                      122,400                126,596                                 Others
     Subjumlah                                     21,195,397             21,959,768                                Subtotal

     Bahan Bakar - Non Minyak                                                                                  Non oil - fuel
     Batu bara                                     37,910,416             33,605,922                                    Coal
     Gas alam                                      32,515,574             27,971,145                            Natural Gas
     Panas bumi                                     2,300,529              2,163,836                            Geothermal
     Air                                              273,381                202,168                                  Water
     Biomassa                                         606,843                371,976                             Biosmass

     Subjumlah                                     73,606,743             64,315,046                                 Subtotal
     Minyak pelumas                                   157,630                168,155                               Lubricants

     Jumlah                                        94,959,770             86,442,970                                    Total
Page 136
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                               Lampiran 5/126 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                         NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                           JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)       (Expressed in millions of Rupiah, unless otherwise stated)

39. BEBAN BAHAN             BAKAR        DAN   PELUMAS        39. FUEL AND LUBRICANTS EXPENSE (continued)
    (lanjutan)

    Grup memiliki pembelian pasokan bahan bakar                    Group has fuel and lubricants purchases that exceed
    yang melebihi 10% dari jumlah pendapatan, yaitu                10% of the total revenues, specifically from Pertamina
    pembelian ke Grup Pertamina.                                   Group.

    Lihat Catatan 51 untuk informasi rincian transaksi             Refer to Note 51 for information on the details of
    dan saldo dengan pihak berelasi.                               transactions and balances with related parties.


40. BEBAN PEMBELIAN TENAGA LISTRIK                            40. PURCHASED ELECTRICITY

    Akun ini termasuk pembelian tenaga listrik dari IPP            This account includes the purchase of electricity from
    terkait PPA dan ESC, pembelian tenaga listrik                  certain IPPs in relation to PPAs and ESCs, the
    selama masa uji coba dan pembelian tenaga listrik              purchase of electricity during the commissioning stage
    dari kelebihan produksi dari IPP tertentu.                     and the purchase of excess electricity generated by
    Rinciannya adalah sebagai berikut:                             certain IPPs. The details are as follows:


                                                    2025                    2024
                                               (Enam Bulan/             (Enam Bulan/
                                                Six Months)              Six Months

     Pihak berelasi
     SSP                                            7,046,017                 6,964,459                                       SSP
     SGPJP                                          6,317,268                 6,101,566                                     SGPJP
     PGE                                            1,990,232                 1,950,590                                       PGE
     BPI                                              783,990                   693,556                                        BPI
     Lain-lain                                      3,922,081                 2,009,830                                     Others

     Subjumlah                                     20,059,588                17,720,001                                    Subtotal

     Pihak ketiga                                                                                                     Third parties
     PT Paiton Energy                               7,849,854                 7,031,009                           PT Paiton Energy
     PT Jawa Power                                  4,488,641                 4,762,275                            PT Jawa Power
     PT Bhumi Jati Power                            7,075,386                 7,056,178                        PT Bhumi Jati Power
     PT Bhimasena Power Indonesia                   4,828,826                 7,052,828             PT Bhimasena Power Indonesia
     PT Cirebon Energi Prasarana                    2,760,022                 3,549,706                PT Cirebon Energi Prasarana
     PT Lestari Banten Energi                       2,358,043                 1,702,365                    PT Lestari Banten Energi
     PT General Energi Bali                         1,783,922                 1,814,196                      PT General Energi Bali
     PT Star Energy Geothermal                      1,625,867                 1,614,148                 PT Star Energy Geothermal
     PT DSSP Power Sumsel                           1,152,371                 1,096,564                    PT DSSP Power Sumsel
     Chevron Geothermal Indonesia Ltd.              1,174,946                   967,028           Chevron Geothermal Indonesia Ltd.
     PT Dayabumi Salak Indonesia                    1,024,941                 1,078,388               PT Dayabumi Salak Indonesia
     Lain lain                                     34,891,689                31,813,891                                     Others

     Subjumlah                                     71,014,508                69,538,577                                    Subtotal

     Jumlah                                        91,074,096                87,258,578                                      Total


    *)   Masing-masing di bawah Rp2.000.000.                       *)   Each below Rp2,000,000.
Page 137
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/127 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                          NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                 FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                            JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)        (Expressed in millions of Rupiah, unless otherwise stated)

41. BEBAN SEWA                                                   41. LEASE EXPENSES

                                                       2025                 2024
                                                  (Enam Bulan/          (Enam Bulan/
                                                   Six Months)           Six Months

     Beban yang berkaitan dengan sewa                                                        Expense relating to variable lease
        dengan pembayaran variabel yang tidak                                                    payments not included in
     termasuk dalam utang sewa                           585,602               911,847                      lease liabilities
     Beban yang berkaitan dengan                                                                           Expense relating to
        sewa jangka pendek                               772,741               151,876                   short-term leases
     Beban yang berkaitan dengan                                                                           Expense relating to
        sewa nilai rendah                                  88,154               77,295                    low value assets

     Jumlah                                            1,446,497             1,141,018                                    Total


42. BEBAN PEMELIHARAAN                                           42. MAINTENANCE EXPENSES

    Akun ini merupakan beban yang timbul dari                       This account represents spare parts used and
    pemakaian material dan jasa borongan untuk                      contractor fees for maintenance purposes. The
    keperluan    pemeliharaan.     Rincian beban                    details of maintenance expenses are as follows:
    pemeliharaan adalah sebagai berikut:

                                                     2025                   2024
                                                (Enam Bulan/            (Enam Bulan/
                                                 Six Months)             Six Months

    Jasa borongan                                  11,712,729                 10,701,823                        Contractor fees
    Pemakaian material                              2,274,490                  2,335,306                       Spare parts used

    Jumlah                                         13,987,219                 13,037,129                                   Total


43. BEBAN KEPEGAWAIAN                                            43. PERSONNEL EXPENSES

                                                     2025                    2024
                                                (Enam Bulan/             (Enam Bulan/
                                                 Six Months)              Six Months

     Tunjangan                                       4,790,500                   4,574,181                         Allowance
     Jasa Produksi dan insentif                      2,547,141                   2,345,476           Bonus and performance
        prestasi kerja                                                                                             incentives
     Gaji                                            3,019,757                   2,857,522                           Salaries
     Imbalan kerja (catatan 49)                      3,568,319                   3,494,809        Employee benefits (Note 49)
     Lain-lain                                       4,444,982                   3,409,751                             Others

     Jumlah                                         18,370,699                  16,681,739                                Total


44. BEBAN USAHA LAIN-LAIN                                        44. OTHER OPERATING EXPENSES

                                                     2025                    2024
                                                (Enam Bulan/             (Enam Bulan/
                                                 Six Months)              Six Months

     Honorarium                                       790,413                     743,553                          Honorarium
     Pembacaan meter                                1,138,643                   1,024,471                        Meter reading
     Amortisasi tak berwujud                          423,519                     489,077             Amortisation of intangible
      (catatan 12)                                                                                            assets (Note 12)
     Teknologi informasi                              112,810                     149,201            Technological information
     Penyisihan kerugian kredit                                                                   Allowance of expected credit
       ekspektasian utang                              (8,054)                    215,590                 losses of receivable
     Pengelolaan pelanggan                            137,124                     135,335              Customer maintenance
     Lain-lain                                      2,140,830                   2,079,746                                Others

     Jumlah                                         4,735,285                   4,836,973                                 Total
Page 138
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                       Lampiran 5/128 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                       NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                              FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                         JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                     (Expressed in millions of Rupiah, unless otherwise stated)

45.    BEBAN KEUANGAN                                                        45. FINANCE COSTS


                                                            2025                           2024
                                                       (Enam Bulan/                    (Enam Bulan/
                                                        Six Months)                     Six Months

       Pihak berelasi                                                                                                              Related parties
       Utang bank                                                1,274,395                  1,266,575                                     Bank loans
       Penerusan pinjaman                                          581,122                    424,828                                Two-step loans
       Utang kepada Pemerintah                                      62,482                     62,856                            Government loans
       Instrumen derivatif *)                                    (326,528)                  (965,287)                        Derivatife instrument *)
       Subjumlah                                                 1,591,471                    788,972                                       Subtotal

       Pihak ketiga                                                                                                                    Third parties
       Utang obligasi                                            3,879,734                  3,575,093                                Bonds payable
       Utang bank                                                2,490,097                  2,846,593                                     Bank loans
       Utang sewa (Catatan 26)                                   3,230,969                  3,019,997                     Lease liabilities (Note 26)
       Utang listrik swasta                                        177,508                    183,791                  Electricity purchase payable
       Lain-lain                                                    14,702                     49,716                                         Others

       Subjumlah                                                 9,793,010                  9,675,190                                        Subtotal

       Jumlah                                                   11,384,481                10,464,162                                             Total

      *)   Beban keuangan dari transaksi instrumen derivatif.                     *)     Finance expense from transaction of derivative instrument.



46. PENDAPATAN LAIN-LAIN - BERSIH                                            46. OTHER INCOME - NET


                                                                2025                          2024
                                                           (Enam Bulan/                   (Enam Bulan/
                                                            Six Months)                    Six Months

       Bagian laba (rugi) bersih entitas asosiasi                                                                  Equity in net income of associates
         dan ventura bersama (Catatan 9)                            2,031,741                   1,900,188           and joint ventures (Note 9)
       Penghasilan denda administrasi                                 768,219                     479,900               Administrative penalty income
       Keuntungan penjualan aset tidak                                                                               Gain on sale of assets not used
         digunakan dalam operasi                                      122,531                       45,372                             in operations
       Penghasilan jasa dan klaim                                      81,075                       38,585                  Claim and service income
       Beban penyusutan aset tetap                                                                                     Loss on impairment off assets
         tidak digunakan dalam operasi(Catatan 6)                   (759,897)                    (572,653)         not used in operations (Note 6)
       Program pemberdayaan lingkungan                              (162,732)                    (198,885)        Community development programs
       Penyisihan atas ketidakpastian dalam                                                                                 Allowance for uncertainty
         perlakuan pajak                                           (2,797,326)                          -                         over tax treatment
       Beban penelitian                                                (77,045)                 (115,901)                          Research expenses
       Lain-lain                                                     1,682,605                  1,072,912                                       Others
       Jumlah                                                         889,172                   2,649,518                                             Total
Page 139
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/129 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                             NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                    FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                               JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)           (Expressed in millions of Rupiah, unless otherwise stated)

47. PAJAK PENGHASILAN                                              47. INCOME TAX


                                                     2025                   2024
                                                (Enam Bulan/            (Enam Bulan/
                                                 Six Months)             Six Months

     Beban Pajak kini                                                                                                   Current tax
      Perusahaan                                                                                                    The Company
       Tahun berjalan                                                                                              Current year

     Entitas anak                                                                                                    Subsidiaries
     Tahun berjalan                                 2,550,742                    1,446,590                          Current year
     Tahun sebelumnya                                       -                            -                            Prior year
                                                    2,550,742                    1,446,590
     Pajak tangguhan                                                                                                   Deferred tax
     Perusahaan                                       461,896                      518,186                        The Company
     Entitas anak                                   2,102,550                    2,268,559                         Subsidiaries
                                                    2,564,446                    2,786,745

     Jumlah beban pajak                             5,115,188                    4,233,335             Total icome tax expenses


    a.   Pajak kini                                                    a.     Current tax

         Rekonsiliasi antara laba sebelum pajak                               The reconciliation between the consolidated
         penghasilan konsolidasian dengan estimasi                            profit before income tax and the estimated
         penghasilan kena pajak adalah sebagai berikut:                       taxable      income    is    as    follows:

                                                     2025                 2024
                                                (Enam Bulan/         (Enam Bulan/
                                                 Six Months)          Six Months)

         Laba sebelum pajak                                                                        Profit before tax per consolidated
           menurut laporan laba rugi                                                              statements of profit or loss and
           komprehensif konsolidasian                11,752,274               9,234,888             other comprehensive income
         Laba sebelum pajak                                                                              Profit before tax attributable
           entitas anak                             (22,873,346)            (18,916,998)                            to subsidiaries
         Disesuaikan dengan jurnal                                                                     Adjustment for consolidation
           eliminasi konsolidasian                       54,959                  95,348                         elimination entries

         Laba sebelum pajak Perusahaan              (11,066,112)             (9,586,762)            Profit before tax - the Company
         Koreksi fiskal:                                                                                           Fiscal correction:
           Beban sewa                                   634,551               1,169,051                          Lease expenses
           Penyambungan pelanggan                     3,519,822               3,552,865               Customer connection fees
                                                                                                 Depreciation of property, plant
           Penyusutan aset tetap                     (8,341,940)             (8,250,962)                      and equipment
           Imbalan kerja                               1,457,113               1,514,171                      Employee benefits
           Penyusutan biaya dikapitalisasi           (1,141,256)             (1,138,624)     Depreciation of capitalised expense
           Biaya /(pendapatan yang)
             tidak dapat diperhitungkan                                                                   Non-deductible expense/
             menurut fiskal:                                                                             (non-taxable income):
           Kesejahteraan karyawan                       973,038                 125,992                         Employee welfare
           Penyisihan kerugian kredit                                                        Allowance for expected credit losses
             ekspektasian piutang dan                                                        of receivables and allowance for
             penurunan nilai persediaan dan                                                     decline in value of inventories
             persediaan usang                         (108,999)                 161,450           and inventory obsolescence
           Penghasilan bunga telah                                                                                 Interest income
             dikenakan pajak final                    (348,650)               (443,092)                   subjected to final tax
           Beban lain tidak dapat dikurangkan           969,265               6,085,341            Other nondeductible expenses
                                                              --                      --
         Estimasi laba fiskal kena pajak                                                                    The company's taxable
           Perusahaan tahun berjalan                (13,453,168)             (6,810,570)                     income for the year

         Beban pajak kini - Perusahaan                                                                  Current tax - the Company

         Beban pajak kini - Entitas anak              2,550,742               1,446,590              Current tax - the Subsidiaries

         Total beban pajak                            2,550,742               1,446,590                 Total Income tax expenses
Page 140
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                      Lampiran 5/130 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                   NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                          FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                     JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                 (Expressed in millions of Rupiah, unless otherwise stated)


47. PAJAK PENGHASILAN (lanjutan)                                       47. INCOME TAX (continued)

    a.   Pajak kini (lanjutan)                                                 a.   Current tax (continued)

         Laba kena pajak hasil rekonsiliasi menjadi                                 The taxable income resulting from the
         dasar dalam pengisian Surat Pemberitahuan                                  reconciliation will become the basis for filing the
         Tahunan PPh Badan.                                                         Annual CIT Return.

    b.   Pajak tangguhan                                                       b.   Deferred tax

                                                                     30 Juni/June 30, 2025
                                                                                    Dikreditkan
                                                                 Dikreditkan       (dibebankan)
                                                               (dibebankan)       ke pendapatan
                                                                 ke laporan     komprehensif lain/
                                                                 Laba rugi/     Credited (charged)
                                              1 Januari/          Credited            to other       Saldo akhir/
                                              January 1,        (charged) to      comprehensive       Ending
                                                 2025             income              income           balance

          Aset Pajak tangguhan                                                                                                     Deferred tax assets
           Akumulasi rugi fiskal                          -               682                   -               682        Accumulated fiscal losses
           Liabilitas imbalan kerja                 185,155           (66,470)                 24           118,709       Employee benefit liabilities
           Pendapatan ditangguhkan                      773              (773)                  -                 -                 Deferred incomes
           Aset hak guna                             (2,345)            2,432                   -                87              Right On Use Asset
           Utang sewa                                     -            18,511                   -            18,511                  Lease Liabilities
           Aset tetap                               293,463           (30,645)                  -           262,818    Property, plant and equipment
           Bonus                                     41,382           (40,555)                  -               827                            Bonus
           Penyisihan persediaan                     24,444            33,318                   -            57,762             Provision inventories
           Penyisihan piutang usaha                  59,745           (10,259)                  -            49,486     Provision Account receivable
           Laba dari entitas asosiasi                     -                 -                   -                 -          Income form associates
           Biaya ditangguhkan                         6,757            (6,757)                  -                 -                 Deferred charges
           Lainnya                                        -            (7,702)                  -            (7,702)                           Others
          Jumlah                                    609,374          (108,218)                 24           501,180                                Total


          Liabilitas pajak tangguhan                                                                                            Deferred tax liabilities
           Akumulasi rugi fiskal                      3,581             (3,581)                 -                 -        Accumulated fiscal losses
           Liabilitas imbalan kerja              16,140,734            342,987           (124,551)       16,359,170       Employee benefit liabilities
           Pendapatan ditangguhkan                8,005,317            774,361                  -         8,779,678                 Deferred revenue
           Aset hak guna                         (5,079,462)           702,775                  -        (4,376,687)             Right On Use Asset
           Utang Sewa                             1,755,208            (47,811)                 -         1,707,397                   Lease liabilities
           Aset tetap                           (91,230,835)        (3,772,715)                 -       (95,003,550)   Property, plant and equipment
           Bonus                                    209,896             37,079                  -           246,975                            Bonus
           Provision inventories                     99,024              9,774                  -           108,798             Provision Inventories
           Provision Account receivable               3,054              2,726                  -             5,780     Provision Account receivable
           Penyertaan pada entitas asosiasi               -                  -                  -                 -          Income form associates
           Deferred charges                               -                  -                  -                 -                 Deferred charges
           Lainnya                                   91,312           (501,822)                 -          (410,510)                           Others
          Jumlah                                (70,002,171)        (2,456,227)          (124,551)      (72,582,949)                                Total

                                                                    (2,564,445)          (124,527)      (72,081,769)
Page 141
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                       Lampiran 5/131 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                    NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                           FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                      JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                  (Expressed in millions of Rupiah, unless otherwise stated)


47. PAJAK PENGHASILAN (lanjutan)                                       47. INCOME TAX (continued)

    b.   Pajak tangguhan (lanjutan)                                           b.   Deferred tax (continued)

                                                            31 Desember/December 31, 2024
                                                                               Dibebankan
                                                           Dikreditkan/      ke penghasilan
                                                          (dibebankan)        komprehensif
                                                            ke laporan             lain/
                                                             laba rugi/         Charged
                                      Saldo awal/            Credited/           to other             Saldo akhir/
                                      Beginning            (charged) to     comprehensive               Ending
                                       balance            profit or loss         income                 balance

         Aset pajak tangguhan                                                                                                        Deferred tax assets
         Liabilitas imbalan kerja            175,592               4,795                4,768                  185,155        Employee benefits liabilities
         Pendapatan ditangguhkan                 254                 519                    -                      773                   Deferred revenue
         Aset hak guna                        (1,374)               (971)                   -                   (2,345)                Right-of-use assets
         Aset tetap                          223,944              80,852              (11,333)                 293,463      Property, plant and equipment
         Penyisihan penurunan                                                                                                    Provision for impairment
           nilai piutang                      58,599                1,146                     -                 59,745            losses of receivables
         Penyisihan persediaan                30,647               (6,203)                    -                 24,444           Provision for inventories
         Bonus                                47,654               (6,272)                    -                 41,382                            Bonuses
         Beban ditangguhkan                    5,378                1,379                     -                  6,757                   Deferred charges

         Jumlah                              540,694              75,245               (6,565)                 609,374                                Total

         Liabilitas pajak tangguhan                                                                                               Deferred tax liabilities
         Akumulasi rugi fiskal                      -               3,581                   -                     3,581          Accumulated tax losses
         Liabilitas imbalan kerja          14,475,245          (1,132,929)          2,798,418                16,140,734       Employee benefits liabilities
         Pendapatan ditangguhkan            6,293,502           1,711,815                   -                 8,005,317                  Deferred revenue
         Liabilitas sewa                    1,895,286            (140,078)                  -                 1,755,208                    Lease liabilities
         Aset hak guna                     (5,559,384)            479,922                   -                (5,079,462)               Right-of-use assets
         Aset tetap                       (75,622,099)         (7,131,617)         (8,477,119)              (91,230,835)    Property, plant and equipment
         Bonus                                173,318              36,578                   -                   209,896                           Bonuses
         Penyisihan persediaan                 82,970              16,054                   -                    99,024          Provision for inventories
         Penyisihan penurunan                                                                                                    Provision for impairment
           nilai piutang                       3,276                (222)                     -                  3,054            losses of receivables
         Lainnya                              29,147              62,165                      -                 91,312                              Others

         Jumlah                           (58,228,739)         (6,094,731)         (5,678,701)              (70,002,171)                              Total

                                                               (6,019,486)         (5,685,266)




         Pajak atas laba sebelum pajak konsolidasian                               The tax on the consolidated profit before income
         berbeda dengan jumlah teoritis yang dihitung                              tax differs from the theoretical amount that would
         menggunakan rata-rata tertimbang tarif pajak                              arise using the weighted average tax rate
         yang berlaku atas laba/(rugi) masing-masing                               applicable of profit/(loss) of the consolidated
         entitas anak yang dikonsolidasi sebagai                                   subsidiaries as follows:
         berikut:
                                                              2025                       2024
                                                         (Enam Bulan/                (Enam Bulan/
                                                          Six Months)                 Six Months

         Laba sebelum pajak penghasilan                                                                                   Profit income before tax
           menurut laporan laba rugi                                                                             Per consolidated statements of
           komprehensif konsolidasian                         11,752,274                      9,234,888                 comprehensive income


         Beban pajak sesuai tarif pajak                                                                                              Tax expense at
           yang berlaku yaitu 22%                               2,585,500                     2,031,675                     prevailing rate of 22%

         Pengaruh pajak atas:                                                                                                           Tax effect on:
         Biaya yang tidak dapat
           dikurangkan menurut pajak                                                                                      Non-deductible expenses
         Kesejahteraan karyawan                                 1,563,366                         286,222                         Employee welfare
         Bagian atas laba bersih                                                                                             Share in net income of
           entitas asosiasi dan ventura bersama                 (446,983)                     (418,042)              associates and joint ventures
         Penghasilan bunga dikenakan                                                                                      Interest income subject to
          pajak final                                            (88,579)                     (143,503)                                    final tax
         Revaluasi Aset                                                                                                       Revaluation of Assets
         Beban lain tidak dapat dikurangkan                     1,501,884                     2,476,982              Other non-deductible expenses

         Jumlah                                                 5,115,188                     4,233,335                                             Total
Page 142
                        PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                     DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                      Lampiran 5/132 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                     NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                            FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                       JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                   (Expressed in millions of Rupiah, unless otherwise stated)

47. PAJAK PENGHASILAN (lanjutan)                                          47. INCOME TAX (continued)
    c.     Surat ketetapan pajak                                               c.   Tax assessment letters
                                                                                     Jumlah yang         Jumlah yang
                                                                                     diperkarakan         diperkarakan
                                             Tahun                                      dalam            dalam Rupiah/
                                                                                       Rupiah/
                                             pajak/       Surat ketetapan              Dispute             Dispute
                                                               pajak/
              Jenis pajak/Tax type           Fiscal       Tax assessment            amount in IDR        amount in IDR            Status/ Status
                                              year
                                                               letter                 30 Juni/           31 Desember/
                                                                                    June 30, 2025        December 31,
                                                                                                             2025
     PLN
     PPN Pemungut/VAT Collector              2018        Kurang bayar/                                                    Banding diterima sebagian/
                                                         Underpayment               310,037          310,037             Appeal partially granted
      PPh pasal 21/Income tax art 21         2018        Kurang bayar/                                                    Peninjauan kembali
                                                         Underpayment               336,283          336,283             / judicial review
      PPh pasal 22/Income tax art 22         2018        Kurang bayar/                                                    Peninjauan kembali /
                                                         Underpayment               48,455           48,455               judicial review
      PPh pasal 23/Income tax art 23         2018        Kurang bayar/                                                    Proses peninjauan kembali /
                                                         Underpayment               2,380,167        2,380,167            judicial review in progress
      PPh pasal 4 ayat (2)/Income tax art    2018        Kurang bayar/                                                    Proses peninjauan kembali /
     4(2)                                                Underpayment               2,514,507        2,950,557            judicial review in progress
      Bea meterai/Stamp duty                 2018        Kurang bayar/                                                    Peninjauan kembali /
                                                         Underpayment               199,341          199,341              judicial review
      PPh pasal 21/Income tax art 21         2019        Kurang bayar/                                                    Banding / Appeal
                                                         Underpayment               17,086           114,695
      PPh pasal 22/Income tax art 22         2019        Kurang bayar/                                                   Proses peninjauan kembali /
                                                         Underpayment               499,208          499,208             judicial review in progress
      PPh pasal 4 ayat (2)/Income tax art    2019        Kurang bayar/                                                   Banding / Appeal
     4(2)                                                Underpayment               4,161            1,064,279
      PPh pasal 26/Income tax art 26         2019        Kurang bayar/                                                    Proses peninjauan kembali /
                                                         Underpayment               223,232          223,992              judicial review in progress
      Bea meterai/Stamp Duty                 2019        Kurang bayar/                                                    Proses peninjauan kembali
                                                         Underpayment               377,385          377,385             / judicial review in progress
      PPh Badan/Corporate income tax         2019        Kurang bayar/                                                    Banding / Appeal
                                                         Underpayment               6,094,734        6,122,611
      PPN pemungut/VAT collector             2019        Kurang bayar/                                                    Proses peninjauan kembali /
                                                         Underpayment               704,249          878,959             judicial review in progress
      PPh pasal 4 ayat (2)/ Income tax art   2020        Kurang bayar/                                                    Keberatan/Objection
     4(2)                                                Underpayment               477,687          477,687

      Bea meterai/Stamp duty                 2020        Kurang bayar/                                                   Keberatan/Objection
                                                         Underpayment               79,048           79,048
      PPh pasal 22/Income tax art 22         2020        Kurang bayar/                                                   Keberatan/Objection
                                                         Underpayment               198,985          241,613
      PPh pasal 23/Income tax art 23         2020        Kurang bayar/                                                   Keberatan/Objection
                                                         Underpayment               1,342,502        1,342,502
      PPh Badan/Corporate income tax         2020        Kurang bayar/                                                   Keberatan/Objection
                                                         Underpayment               5,386,975        2,704,402
      PPh pasal 26/Income tax art 26         2020        Kurang bayar/                                                   Keberatan/Objection
                                                         Underpayment               11,211           46,735
      PPN dalam negeri/Domestic VAT          2020        Kurang bayar/                                                   Keberatan/Objection
                                                         Underpayment               84,257           84,257
     STP PPN dalam negeri/                   2020        Kurang bayar/                                                   Keberatan/Objection
     Tax assessment letter domestic VAT                  Underpayment               11,847           11,847

      PNP
      PPh pasal 22/Income Tax Art 22         2019        Kurang bayar/                                                   Banding/Appeal
                                                         Underpayment               199,496          136,172

      PIP                                                                                                                Banding/Appeal
      PPh Badan/Corporate income tax         2016         Kurang bayar                                                   Banding/Appeal
                                                         /Underpayment              16,095           16,095
      PPh Badan/Corporate income tax         2016         Lebih bayar/                                                   Pemeriksaan/Inspection
                                                         Overpayment                513              -
      PPh pasal 23/Income tax art 23         2018         Kurang bayar/                                                  Banding/Appeal
                                                         Underpayment               19,925           19,925
      PPh pasal 4 ayat (2)/ Income tax art   2018         Kurang bayar/                                                  Banding/Appeal
     4(2)                                                Underpayment               136,071          136,071

      PPh pasal 22/Income tax art 22         2020        Kurang bayar/                                                   Banding/Appeal
                                                         Underpayment               31,808           31,808
      PPh Badan/Corporate income tax         2020        Kurang bayar/                                                   Banding/Appeal
                                                         Underpayment               15,863           15,863
      PPh pasal 22/Income tax art 22         2021        Kurang bayar/                                                   Banding/Appeal
                                                         Underpayment               50,122           50,122
      PPh Badan/Corporate income tax         2022        Kurang bayar/                                                   Pemeriksaan/Inspection
                                                         Underpayment               8,918            8,918
      PPh pasal 4 ayat (2)/ Income tax art   2021        Lebih bayar/                                                    Banding/Appeal
     4(2)                                                Overpayment                472

      PPh pasal 4 ayat (2)/ Income tax art   2024        Kurang bayar/                                                   Pemeriksaan/Inspection
     4(2)                                                Underpayment               311              -


      Haleyora Power
      PPh Badan/Corporate income tax         2017        Kurang bayar/                                                   Banding/Appeal
                                                         Underpayment               12,655           12,655
      PPh pasal 23/Income tax art 23         2017        Kurang bayar/                                                   Banding/Appeal
                                                         Underpayment               122              122
      PPN pemungut/VAT collector             2017        Kurang bayar/                                                   Banding/Appeal
                                                         Underpayment               4,891            4,891
      PPh Badan/Corporate income tax         2018        Kurang bayar/                                                   Banding diterima sebagian/
                                                         Underpayment                                6,660               Appeal partially granted
      PPh Badan/Corporate income tax         2023        Lebih bayar/                                                    Pemeriksaan/Inspection
                                                         Overpayment                2,821            15,051
      PPh Badan/Corporate income tax         2024        Lebih bayar/                                                    Pemeriksaan/Inspection
                                                         Overpayment                6,094
Page 143
                         PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                      DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                 Lampiran 5/133 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                       FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                  JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)              (Expressed in millions of Rupiah, unless otherwise stated)

47. PAJAK PENGHASILAN (lanjutan)                                       47. INCOME TAX (continued)

    c. Surat ketetapan pajak (lanjutan)                                    c. Tax assessment letters (continued)
                                                                                  Jumlah yang       Jumlah yang

                                                                                  diperkarakan      diperkarakan

                                        Tahun                                     dalam Rupiah/    dalam Rupiah/

                                        pajak/       Surat ketetapan                 Dispute          Dispute
                                                          pajak/
               Jenis pajak/Tax type     Fiscal       Tax assessment               amount in IDR    amount in IDR     Status/ Status
                                         year
                                                          letter                    30 Juni/       31 Desember/
                                                                                  June 30, 2025    December 31,
                                                                                                       2025


       Haleyora Power

       PPh Badan/Corporate income tax   2025        Lebih bayar/                                                    Pemeriksaan/
                                                    Overpayment               14,998                               Inspection
       EPI
       PPh Badan/Corporate income tax   2017        Lebih bayar/                                                    Banding diterima
                                                    Overpayment               -                   5,632            sebagian/
                                                                                                                   Appeal     partially
                                                                                                                   granted
       PPN/VAT                          2020        Lebih bayar/                                                    Banding/Appeal
                                                    Overpayment               12,501              12,503
       PPh Badan/Corporate income tax   2024        Lebih bayar/                                                   Banding/Appeal
                                                    Overpayment               156,404
       PPN/VAT                          2023        Lebih bayar/                                                   Banding/Appeal
                                                    Overpayment               376,929             59,189
       COMNET
       PPh Badan/Corporate income tax   2023        Lebih bayar/              42,204                               Keberatan/
                                                    Overpayment                                                    Objection

       Jumlah/Total
                                                                              22,410,570          21,025,734
       Provisi - Notes
                                                                              (9,615,323)         (6,885,770)
       Netto
                                                                              12,795,247          14,139,964




          Pada tanggal 7 Februari 2024, Perusahaan                           On February 7, 2024, the Company has made an
          telah melakukan pembayaran tambahan                                additional payment of Rp1,753,012 for the
          sebesar Rp1.753.012 atas SKPKB tahun fiskal                        SKPKB fiscal year 2020. The Company has
          2020. Perusahaan telah menyampaikan surat                          submitted objection letters to DJP regarding
          keberatan atas SKPKB tahun fiskal 2020                             SKPKB for fiscal year 2020 on February 26,
          kepada DJP pada tanggal 26 Februari 2024.                          2024.

          Pada tanggal 8 Oktober 2024, Perusahaan                            On October 8, 2024, the Company has made an
          telah melakukan pembayaran tambahan                                additional payment of Rp3,073,733 for the
          sebesar Rp3.073.733 atas SKPKB tahun fiskal                        SKPKB fiscal year 2019.
          2019.

          Selama tahun yang berakhir 31 Desember                             During years ended December 31, 2024, the
          2024, Grup telah menerima pengembalian                             Group received tax refunds from the proceeds of
          pajak dari hasil keberatan dan banding untuk                       the objections and appeals for fiscal years 2016,
          tahun fiskal 2016, 2018, 2019, 2022 sebesar                        2018, 2019, 2022 amounted to Rp334,280
          Rp334.280 yang terdiri dari pengembalian                           consisting of tax refunds for underpayment of
          pajak atas kurang bayar PPN sebesar                                VAT amounted to Rp19,469, Income Tax Article
          Rp19.469, PPh Pasal 22 sebesar Rp228.197,                          22 amounted to Rp228,197, Income Tax Article
          PPh Pasal 26 sebesar Rp77.147 dan PPh                              26 amounted to Rp77,147 and Corporate Income
          badan sebesar Rp9.467. Grup menerima                               Tax amounted to Rp9,467. The Group received
          pengembalian      pajak    tersebut  melalui                       those tax refunds through cash receipts
          penerimaan kas sebesar Rp330.085        dan                        amounting to Rp330,085 and through a
          melalui pemotongan utang pajak sebesar                             deduction of tax payables amounting to Rp4,195.
          Rp4.195.

          Pada tanggal 24 Januari 2025 dan 26 Maret                          On 24 January 2025 and 26 March 2025, the
          2025,     Perusahaan    telah   melakukan                          Company has made an additional payment of
          pembayaran tambahan sebesar Rp1.500.000                            Rp1,500,000 for the SKPKB Corporate Income
          atas SKPKB PPh Pasal 25/29 Badan tahun                             Tax Art. 25/29 for the fiscal year 2020.
          fiskal 2020.
Page 144
                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/134 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                             FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                        JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)    (Expressed in millions of Rupiah, unless otherwise stated)


47.    PAJAK PENGHASILAN (lanjutan)                          47. INCOME TAX (continued)

       c. Surat ketetapan pajak (lanjutan)                       c. Tax assessment letters (continued)


           Pada tanggal 9 Januari 2025, Perusahaan telah           On 9 January 2025, the Company has received
           menerima     pengembalian     pajak   melalui           tax refunds through cash receipts for excess
           penerimaan kas atas kelebihan PPh Pasal 26              Income Tax art. 26 for the period November and
           masa November dan Desember 2019 sebesar                 December 2019 amounted to Rp760.
           Rp760.

           Pada tanggal 21 Januari 2025, Perusahaan                On 21 January 2025, the Company has received
           telah menerima pengembalian pajak melalui               tax refunds through cash receipts for excess
           penerimaan kas atas kelebihan PPh Pasal 4               Income Tax art. 4 (2) for the period December
           ayat (2) Desember 2018 sebesar Rp435.992.               2018 amounted to Rp435,992.


           Pada April 2025, Perusahaan menerima                    In April 2025, the Company received a non-cash
           pengembalian kelebihan pajak non tunai untuk            tax refund for Income Tax Article 4(2) December
           PPh Pasal 4(2) Desember 2019 sebesar                    2019 amounting to Rp1,060,117, Income Tax
           Rp1.060.117, PPh Pasal 21 Desember 2019                 Article 21 December 2019 amounting to
           sebesar Rp97.608 serta PPh Badan Rp27.876,              Rp97,608 and Corporate Income Tax Rp27,876,
           yang di sett off untuk melunasi utang pajak PPh         which was set off to pay off the 2020 Corporate
           Badan Tahun 2020 Rp1.182.572 dan pajak                  Income Tax debt of Rp1,182,572 and other taxes
           lainnya sebesar Rp3.030                                 amounting to Rp3,030.

           Manajemen berkeyakinan bahwa provisi atas               Management believes that the provision against
           ketidakpastian posisi pajak telah mencukupi.            uncertain tax positions is adequate.

      d.   Administrasi                                         d. Administration

           Berdasarkan Undang-Undang perpajakan yang               Based on the taxation laws in Indonesia,
           berlaku di Indonesia, perusahaan-perusahaan             companies within the Group which are domiciled
           di dalam Grup yang berdomisili di Indonesia             in Indonesia calculate and pay tax based on self-
           menghitung dan membayar sendiri besarnya                assessment. The DJP may assess or amend
           jumlah pajak yang terutang. DJP dapat                   taxes within five years of the time the tax
           menetapkan atau mengubah pajak dalam batas              becomes due.
           waktu lima tahun saat terutangnya pajak.

      e.   Aturan Model Pilar Dua Organization for              e. Organization for Economic Cooperation and
           Economic Cooperation and Development                    Development ("OECD") Pillar Two Model Rules
           (“OECD")

           Peraturan Menteri Keuangan ("PMK") No.                  Organization for Economic Cooperation and
           PMK-136 Tahun 2024 ("PMK-136") telah                    Development ("OECD") Pillar Two Model Rules
           diundangkan di Indonesia, yurisdiksi dimana             The Ministry of Finance ("MoF) Regulation No.
           tempat Perseroan didirikan, dan akan berlaku            PMK-136 Tahun 2024 (“PMK-136”) was enacted
           mulai 1 Januari 2025. Dikarenakan PMK-136               in Indonesia, the jurisdiction in which the
           belum efektif pada tanggal pelaporan, Grup              Company is incorporated, and will come into
           tidak memiliki eksposur atas pajak kini. Grup           effect from 1 January 2025. Since the PMK-136
           menerapkan pengecualian untuk mengakui dan              was not effective at the reporting date, the Group
           mengungkapkan informasi tentang aset dan                has no related current tax exposure. The Group
           kewajiban pajak tangguhan terkait pajak                 applies the exception to recognise and disclose
           penghasilan Pilar Dua, sebagaimana diatur               information about deferred tax assets and
           dalam amendemen terhadap PSAK 212 "Pajak                liabilities related to Pillar Two income taxes, as
           Penghasilan" yang diterbitkan pada bulan                provided in the amendment to PSAK 212
           Desember 2023.                                          "income Taxes" issued in December 2023.
Page 145
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                             Lampiran 5/135 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                               FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                          JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)      (Expressed in millions of Rupiah, unless otherwise stated)


48. LABA PER SAHAM DASAR DAN DILUSIAN                          48. EARNINGS PER SHARE BASIC/DILUTED

                                                   2025                 2024
                                              (Enam Bulan/          (Enam Bulan/
                                               Six Months)           Six Months

     Laba konsolidasian tahun berjalan
      yang dapat diatribusikan kepada                                                      Consolidated profit for the year
      pemilik entitas induk                        6,638,824             4,992,188               attributable to owners
     Rata-rata tertimbang jumlah                                                             Weighted averag number of
      saham biasa yang beredar                                                             ordinary shares outstanding
       (dalam ribuan lembar saham)                   150,536               146,961                       (in thousand of
                                                                                                                 shares)

       Laba bersih per saham dasar                                                             Basic earnings per share
         yang dapat diatribusikan                                                           attributable to the owners
         kepada pemilik entitas induk                                                                of the parent entity
         (dalam Rupiah penuh)                         44,101                33,970          (in full amount of Rupiah)




    Perusahaan tidak mempunyai efek berpotensi dilusi              The Company did not have potential dilutive
    saham, sehingga laba per saham dasar sama                      ordinary shares, therefore basic earnings per share
    dengan laba per saham dilusian.                                is the same as the dilutive earnings per share.
Page 146
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                             Lampiran 5/136 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                     NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                            FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                       JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)   (Expressed in millions of Rupiah, unless otherwise stated)

49. LIABILITAS IMBALAN KERJA                                49. EMPLOYEE BENEFITS LIABILITIES

                                             30 Juni/         31 Desember/
                                             June 30,         December 31,
                                               2025               2024

     Liabilitas imbalan kerja jangka                                             Short-term employee benefit liabilities
     pendek
     Bonus dan insentif prestasi kerja         6,476,005           7,429,860           Bonus and perfomance incentives
     Liabilitas pascakerja                                                            Post-employment benefits liability -
      jangka pendek                            3,080,161          3,568,775                         current portion
     Jumlah                                    9,556,166         10,998,635                                        Total


     Liabilitas imbalan kerja jangka                                             Long-term employee benefit liabilities
     panjang
     Imbalan pascakerja                                                                        Post-employment benefits
     Program pensiun                                                                                   Pension program
     Imbalan pascakerja lainnya               18,182,449         17,501,759              Other post-employment benefits
     Imbalan pemeliharaan kesehatan           56,286,612         55,746,191                          Health care benefits
     Imbalan jangka panjang lainnya              751,127            772,966                     Other long-term benefits
     Jumlah                                   75,220,188         74,020,916                                        Total
     Dikurangi : bagian jangka pendek          3,080,161          3,568,775                      Less : current portion
     Bagian jangka panjang                    72,140,027         70,452,141                          Long-term portion

     Beban diakui di laba rugi:                                                    Expense recognise in profit or loss:
                                             30 Juni/        31 Desember/
                                             June 30,        December 31,
                                               2025              2024
     Imbalan pascakerja                                                                        Post-employment benefits
     Program pensiun manfaat pasti                45,355            102,955              Defined benefit pension program
     Imbalan pascakerja lainnya                1,175,981          2,246,803              Other post-employment benefits
     Imbalan pemeliharaan kesehatan            2,216,890        (4,285,122)                          Health care benefits
     Imbalan jangka panjang lainnya              130,093            229,851                      Other long-term benefits
     Jumlah                                    3,568,319        (1,705,513)                                         Total

     Pengukuran kembali program                                                        Remeasurement on defined benefit:
      manfaat pasti diakui di                                                                 plan recognised in other
      penghasilan komprehensif lain:                                                          comprehensive income:
                                             30 Juni/         31 Desember/
                                             June 30,         December 31,
                                               2025               2024
     Imbalan pascakerja                                                                            Post-employment benefits
     Program pensiun manfaat pasti                67,338               103,309               Defined benefit pension program
     Imbalan pascakerja lainnya                   85,657             1,874,636               Other post-employment benefits
     Imbalan pemeliharaan kesehatan            (719,026)            10,763,808                           Health care benefits
     Jumlah                                    (566,031)            12,741,753                                          Total



    Program pensiun manfaat pasti                              Defined benefit pension program

    Grup menyelenggarakan program pensiun manfaat              The Group established a defined benefit pension
    pasti untuk semua karyawan tetap yang memenuhi             program covering all of its eligible permanent
    syarat. Program pensiun ini memberikan imbalan             employees. This pension plan provides benefits
    berdasarkan penghasilan dasar pensiun dan masa             based on basic pension income and the period of
    kerja karyawan.                                            employment.
Page 147
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                             Lampiran 5/137 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                     NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                            FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                       JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)   (Expressed in millions of Rupiah, unless otherwise stated)

49. LIABILITAS IMBALAN KERJA (lanjutan)                     49. EMPLOYEE BENEFITS LIABILITIES (continued)

    Program pensiun manfaat pasti (lanjutan)                    Defined benefit pension program (continued)

    Program pensiun ini dikelola oleh Dana Pensiun             This pension plan is managed by Dana Pensiun PLN
    PLN (”DP-PLN”), pihak berelasi, yang akta                  (“DP-PLN”), a related party, whose deed of
    pendiriannya telah disahkan oleh Kementerian               establishment was approved by the Ministry of
    Keuangan Republik Indonesia dengan Surat                   Finance of the Republic of Indonesia in its Decision
    Keputusannya No. KEP-284/KM.17/1997 tanggal                Letter No. KEP-284/KM.17/1997 dated May 15, 1997.
    15 Mei 1997.

    Pendanaan DP-PLN terutama berasal dari iuran                DP-PLN is mainly funded by contributions from both
    karyawan dan pemberi kerja masing-masing                    the employees and the employer which are 6.00%
    sebesar 6,00% dan 19,45% dari penghasilan dasar             and 19.45% from basic pension income, respectively.
    pensiun.

    Imbalan pemeliharaan kesehatan                              Health care benefits

    Pada tanggal 31 Desember 2024, telah                        As of 31 December 2024, PT PLN (Persero) was
    ditandatangani perjanjian antara PT PLN (Persero)           entered into a one-year insurance agreement with PT
    dengan PT Asuransi Perisai Listrik Nasional terkait         Asuransi Perisai Listrik Nasional related to the health
    dengan pengelolaan fasilitas kesehatan bagi                 care benefit plans for pensioners and their eligible
    pensiunan dan tanggungannya yang memenuhi                   dependents.
    persyaratan dengan jangka waktu di bawah satu
    tahun.

    Imbalan pascakerja lainnya                                  Other post-employment benefits

    Selain dari program dana pensiun dan imbalan                In addition to the pension plan and health care
    pemeliharaan kesehatan, Grup menyediakan                    benefits, the Group also provides unfunded
    imbalan pesangon dan penghargaan purna jabatan              severance benefits and completion of employment
    tanpa pendanaan bagi pegawai yang memenuhi                  awards for eligible employees.
    syarat.

    Imbalan jangka panjang lainnya                             Other long-term benefits

    Grup juga memberikan imbalan kerja jangka                  The Group also provides other long-term employee
    panjang lainnya seperti uang cuti besar, tunjangan         benefits such as long leave allowance, disability
    kecelakaan dinas, bantuan kematian, dan                    benefit, death benefit, and loyalty benefits.
    penghargaan kesetiaan kerja.

    Asumsi-asumsi utama yang digunakan dalam                   The principal assumptions used in the calculations of
    perhitungan liabilitas imbalan kerja                       post employment benefits obligation

    Tabel mortalita                                                                                    Mortality table
      Imbalan pascakerja lainnya                    TMI 2019                      Other post-employment benefits
      Program pensiun manfaat pasti              CSO-58 & AMT- 49                 Defined benefit pension program
      Imbalan jangka panjang lainnya                TMI 2019                              Other long-term benefits
      Imbalan pemeliharaan kesehatan             CSO-58 & AMT- 49                             Health care benefits
    Usia pensiun normal                           56 tahun/years                              Normal retirement age

    Asumsi yang berhubungan dengan pengalaman                     Assumptions regarding future mortality experience
    mortalitas masa depan ditentukan berdasarkan saran            are set based on actuarial advice in accordance with
    aktuaris menurut statistik yang telah diterbitkan dan         published statistics and experience by the Company
    pengalaman dari perusahaan dan entitas anak setiap            and its subsidiaries. The mortality assumptions used
    wilayah. Asumsi mortalitas yang digunakan untuk               for calculation of health care and pension benefit are
    perhitungan imbalan pemeliharaan kesehatan dan                based on the CSO-58 mortality table for active
    dana pensiun adalah tabel mortalita CSO-58 untuk              employment and AMT-49 for pensioners. The
    peserta aktif dan AMT-49 untuk peserta pasif. Asumsi          mortality assumptions used for other post-
    mortalitas yang digunakan untuk perhitungan imbalan           employment and other long-term benefits are based
    pascakerja lainnya dan imbalan jangka panjang                 on TMI-2019.
    lainnya adalah tabel mortalita TMI-2019.
Page 148
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                               Lampiran 5/138 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                          NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                 FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                            JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)        (Expressed in millions of Rupiah, unless otherwise stated)

49. LIABILITAS IMBALAN KERJA (lanjutan)                           49. EMPLOYEE BENEFITS LIABILITIES (continued)

    Asumsi-asumsi utama yang digunakan                 dalam             The principal assumptions used in the calculations of
    perhitungan liabilitas imbalan kerja (lanjutan)                      post employment benefits obligation (continued)

    Perhitungan aktuaria atas program pensiun, imbalan                   The actuarial calculations of the pension program,
    pascakerja lainnya, imbalan pemeliharaan kesehatan,                  other post-employment benefits, health care benefits,
    dan imbalan kerja jangka panjang lainnya untuk tahun                 and other long-term benefits for the year ended
    yang berakhir pada tanggal 31 Desember 2024, yang                    December 31, 2024 was calculcated by a registered
    dihitung oleh Kantor Konsultan Aktuaria (“KKA”) yang                 Actuarial Consulting Firm (“KKA”), KKA Indra
    terdaftar, yaitu KKA Indra Catarya Situmeang, dalam                  Catarya Situmeang, based on its reports dated April
    laporannya tertanggal 30 April 2025, dan untuk tahun                 30, 2025, and for the year ended December 31, 2023
    yang berakhir pada tanggal 31 December 2023, yang                    was calculated by KKA Tubagus Syafrial & Amran
    dihitung oleh KKA Tubagus Syafrial & Amran Nangsan,                  Nangasan, based on its reports dated April 1, 024.
    dalam laporannya tertanggal 1 April 2024.

    i.   Program pensiun                                            i.     Pension program

         Jumlah liabilitas yang diakui pada laporan posisi                 The liability recognised in the consolidated
         keuangan konsolidasian ditentukan sebagai                         statements of financial position is determined as
         berikut:                                                          follows:


                                                   30 Juni/         31 Desember/
                                                  June 30,          December 31,
                                                    2025                 2024
         Nilai kini kewajiban yang didanai         10,801,085           10,908,857        Present value of funded obligations
         Nilai wajar aset program                (11,257,152)         (11,388,020)                   Fair value of plan assets
         Jumlah                                     (456,067)            (479,163)                                       Total
         Dampak batas atas aset                       456,067              479,163                      Impact of asset ceiling
         Liabilitas pada laporan                                                               Liability in the consolidated
          posisi keuangan konsolidasian                      -                     -       statement of financial position


         Pergerakan kewajiban program pensiun                              The movement in the defined benefit pension
         manfaat pasti selama tahun berjalan adalah                        program obligation over the year is as follows:
         sebagai berikut:

                                                  30 Juni/           31 Desember/
                                                  June 30,           December 31,
                                                    2025                  2024
         Saldo awal                               10,908,857             10,408,465                          Beginning balance
         Dibebankan ke laba rugi:                                                                      Charged to profit and loss:
           Biaya jasa kini                             63,940                 132,588                       Current service cost
           Biaya bunga                                363,505                 664,087                           Interest expense
                                                      427,445                 796,675
         Pengukuran kembali:                                                                                   Remeasurements:
         Kerugian aktuarial yang timbul dari                                                                 Loss from change in
          perubahan asumsi keuangan                          -               (64,254)                     financial assumptions
         Kerugian aktuarial dari perubahan                                                             Actuarial loss from various
          beberapa asumsi                                    -                   446                     changes in assumptios
         Kerugian dari penyesuaian
          atas pengalaman                             107,305                 629,590                        Experience Loss
         Kerugian yang timbul dari                                                                        Loss from change in
          perubahan asumsi demografis                      -                   68,917                demographic assumptions
                                                     107,305                  634,699
         Pembayaran manfaat                        (642,522)                (930,982)                            Benefit payment
         Saldo akhir                              10,801,085               10,908,857                            Ending balance
Page 149
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/139 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                           NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                  FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                             JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)         (Expressed in millions of Rupiah, unless otherwise stated)

49. LIABILITAS IMBALAN KERJA (lanjutan)                               49. EMPLOYEE BENEFITS LIABILITIES (continued)

    i. Program pensiun                                                   i. Pension program

         Mutasi nilai wajar aset program selama tahun                         The movement in the fair value of plan assets
         berjalan adalah sebagai berikut:                                     over the year is as follows:

                                                    30 Juni/             31 Desember/
                                                    June 30,             December 31,
                                                      2025                   2024
          Saldo awal                                11,388,020             10,919,630                       Beginning balance
          Imbal hasil atas aset program                 380,775               698,856                    Return on plan assets
          Iuran pemberi kerja                           112,693               206,264                  Employer's contributions
          Iuran pekerja                                  18,186                28,683                   Employee contributions
          Pembayaran manfaat                          (642,522)             (930,982)                        Benefit payments
          Kerugian aktuarial                                                                                     Actuarial loss
            pada aset program                                -                465,569                         of plan assets
          Saldo akhir                               11,257,152             11,388,020                         Ending balance

         Mutasi program pensiun manfaat pasti adalah                       Movements in the defined benefits pension
         sebagai berikut:                                                  program are as follows:


                                                     30 Juni/                31 Desember/
                                                     June 30,                December 31,
                                                       2025                      2024
         Pada awal tahun                                          -                  -                  At beginning of the year

           Dibebankan ke laba rugi:                                                                     Charged to profit or loss:
             Biaya jasa kini                             63,940                132,588                    Current service cost
             Biaya bunga                                363,505                664,087                       Interest expense
             Bunga atas dampak batas atas aset           16,871                 33,819         Interest on the impact of asset
                                                                                                                        ceiling
              Iuran pekerja                             (18,186)               (28,683)              Employee Contributions
              Imbalan hasil aset program               (380,775)              (698,856)                 Return on plan assets

           Iuran pemberi kerja                         (112,693)              (206,264)                Employer's contributions

           Kerugian/(keuntungan) aktuarial                                                           Actuarial loss/(gain) from
             yang timbul dari:                                                                                    changes in:
             Asumsi demografis                                -              68,917.00            Demographic assumptions
             Asumsi keuangan                                  -               (64,254)               Financial assumptions
             Asumsi lainnya                                   -                    446                   Other assumptions
             Penyesuaian atas pengalaman                107,305               629,590               Experience adjustments
           Pengukuran kembali atas imbal                                                          Remeasurement of return on
             hasil atas aset program                           -              (465,569)                           plan assets
           Perubahan dampak batas atas aset             (39,967)               (65,821)        Changes in effect of asset ceiling
           Pada akhir tahun                                    -                      -                At the end of the year



         Asumsi aktuarial utama yang digunakan adalah                      The principal actuarial assumptions used were as
         sebagai berikut:                                                  follows:


                                                    30 Juni/              31 Desember/
                                                    June 30,              December 31,
                                                      2025                     2024
         Tingkat diskonto                        7.03 % - 7.13%           7.03 % - 7.14%                        Discount rate
         Tingkat kenaikan manfaat pensiun            5.00%                    5.00%              Pension benefit increase rate
Page 150
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/140 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                               NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                      FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                 JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)             (Expressed in millions of Rupiah, unless otherwise stated)

49. LIABILITAS IMBALAN KERJA (lanjutan)                              49. EMPLOYEE BENEFITS LIABILITIES (continued)

    i.    Program pensiun (lanjutan)                                       i.     Pension program (continued)

          Kontribusi yang diharapkan untuk program                                Expected contributions to post-employment
          imbalan pascakerja untuk tahun yang berakhir                            benefit plans for the years ended June 30, 2025
          pada 30 Juni 2025 dan 31 Desember 2024                                  and December 31, 2024 are Rp511,654 and
          masing-masing adalah sebesar Rp511.654 dan                              Rp933,804, respectively. The sensitivity of the
          Rp933.804. Sensitivitas dari kewajiban manfaat                          defined benefit obligation to changes in the
          pasti terhadap perubahan asumsi aktuarial                               weighted principal assumptions is as follows:
          utama adalah sebagai berikut:

                                                      Dampak atas kewajiban manfaat pasti/
                                                       Impact on defined benefit obligation
                                            Perubahan               Kenaikan               Penurunan
                                              asumsi/                asumsi/                 asumsi/
                                             Change in             Increase in             Decrease in
                                            assumption            assumption               assumption

          Tingkat diskonto                      1%                           (475,069)               (811,453)                      Discount rate
          Tingkat kenaikan gaji                 1%                           (813,291)               (471,804)                 Salary growth rate


    ii.   Imbalan pascakerja lainnya                                       ii.    Other post-employment benefits

          Pergerakan kewajiban imbalan pascakerja                                 The movement in the other post-employment
          lainnya selama tahun berjalan adalah sebagai                            benefits obligation over the year is as follows:
          berikut:


                                                           30 Juni/                 31 Desember/
                                                           June 30,                 December 31,
                                                             2025                       2024
          Saldo awal                                       17,501,759               14,601,989                          Beginning balance

          Dibebankan ke laba rugi:                                                                               Charged to profit and loss:
            Biaya jasa kini                                   586,600                 1,284,657                    Current service cost
            Biaya bunga                                       589,381                   962,146                       Interest expense
            Biaya jasa lalu                                         -                         -                       Past service cost
            Imbal hasil aset aset program                           -                         -                  Return on plan assets
                                                            1,175,981                 2,246,803
          Pengukuran kembali:                                                                                         Remeasurements:
          Kerugian aktuarial yang timbul dari                                                                      Loss from change in
            perubahan asumsi keuangan                                735                 (478,315)            financial assumptions
          Kerugian/(keuntungan) aktuarial yang                                                          Loss/(gain) from combination of
            timbul dari kombinasi perubahan asumsi                     -                      488             changes in assumptios
          Kerugian/(Keuntungan) dari penyesuaian
            atas pengalaman                                     84,922                2,295,557                 Experience loss/(gain)
          Kerugian yang timbul dari perubahan                                                                     Loss from change in
            asumsi demografis                                        -                    56,906           demographic assumptions
                                                                85,657                 1,874,636
          Pembayaran manfaat                                 (580,948)               (1,221,669)                          Benefit Payment

          Saldo akhir                                      18,182,449                17,501,759                           Ending balance


          Asumsi aktuarial utama yang digunakan adalah                            The principal actuarial assumptions used were as
          sebagai berikut:                                                        follows:


                                                        30 Juni/                 31 Desember/
                                                        June 30,                 December 31,
                                                          2025                        2024
          Tingkat diskonto                           7.04% - 7.14%                6.98 - 7.13%                                Discount rate
          Tingkat kenaikan gaji per tahun            3.00% - 7.12%               5.00% - 7.12%           Rate of salary increase per annum
Page 151
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                 Lampiran 5/141 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                             NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                    FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                               JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)           (Expressed in millions of Rupiah, unless otherwise stated)

49. LIABILITAS IMBALAN KERJA (lanjutan)                            49. EMPLOYEE BENEFITS LIABILITIES (continued)

    ii.   Imbalan pascakerja lainnya (lanjutan)                         ii.    Other post-employment benefits (continued)

          Sensitivitas dari imbalan pascakerja lainnya                         The sensitivity of the other post-employment
          terhadap perubahan asumsi aktuarial utama                            benefits to changes in the weighted principal
          adalah sebagai berikut:                                              assumptions is as follows:

                                                     Dampak atas imbalan pascakerja lainnya/
                                                    Impact on other post-employment benefits
                                             Perubahan              Kenaikan             Penurunan
                                               asumsi/               asumsi/               asumsi/
                                              Change in            Increase in           Decrease in
                                             assumption            assumption            assumption

          Tingkat diskonto                       1%                      2,092,140              (2,515,950)                     Discount rate
          Tingkat kenaikan gaji                  1%                     (2,548,934)              2,159,461                 Salary growth rate


    iii. Imbalan pemeliharaan kesehatan                                 iii. Health care benefit

          Grup memiliki beberapa skema imbalan                                 The Group operates a number of post-
          pemeliharaan kesehatan pascakerja. Metode                            employment health care benefit schemes. The
          akuntansi, asumsi, dan frekuensi penilaian                           method of accounting, assumptions, and the
          adalah sama dengan yang digunakan dalam                              frequency of valuations are similar to those used
          skema pensiun manfaat pasti.                                         for defined benefit pension schemes.

          Pergerakan kewajiban imbalan pemeliharaan                            The movement in the health care benefits
          kesehatan selama tahun berjalan adalah                               obligation over the year is as follows:
          sebagai berikut:


                                                             30 Juni/                 31 Desember/
                                                             June 30,                 December 31,
                                                               2025                       2024
           Saldo awal                                        55,746,191               51,117,646                       Beginning balance

           Dibebankan ke laba rugi:                                                                             Charged to profit and loss:
             Biaya jasa kini                                     294,544                  455,808                 Current service cost
             Biaya Jasa Lalu                                          10              (8,203,811)                    Past service cost
             Biaya bunga                                       1,922,336                3,462,881                    Interest expense
                                                               2,216,890              (4,285,122)
           Pengukuran kembali:                                                                                        Remeasurements:
           Kerugian aktuarial yang timbul dari                                                                     Loss from change in
             perubahan asumsi keuangan                         1,264,972              15,043,467              financial assumptions
           Kerugian/(keuntungan) aktuarial yang                                                         Loss/(gain) from combination of
             timbul dari kombinasi perubahan asumsi                     8                 55,873              changes in assumptios
           Kerugian/(Keuntungan) dari penyesuaian
             atas pengalaman                                 (1,984,003)              (8,787,063)                  Experience loss/(gain)
           Kerugian yang timbul dari perubahan                                                                       Loss from change in
             asumsi demografis                                       (3)                4,451,531             demographic assumptions
                                                               (719,026)              10,763,808
           Pembayaran manfaat                                  (957,443)              (1,850,141)                        Benefit Payment

           Saldo akhir                                       56,286,612               55,746,191                         Ending balance

          Asumsi aktuarial utama yang digunakan adalah                         The principal actuarial assumptions used were as
          sebagai berikut:                                                     follows:


                                                      30 Juni/                31 Desember/
                                                      June 30,                December 31,
                                                        2025                       2024
          Tingkat diskonto                         6.88% - 7.14%              7.12% - 7.14%                                  Discount rate
          Tingkat kenaikan biaya kesehatan             6.00%                      6.00%                        Future health cost increase
Page 152
                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                  Lampiran 5/142 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                       FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                  JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)              (Expressed in millions of Rupiah, unless otherwise stated)

49. LIABILITAS IMBALAN KERJA (lanjutan)                            49. EMPLOYEE BENEFITS LIABILITIES (continued)

    iii. Imbalan pemeliharaan kesehatan (lanjutan)                        iii. Health care benefit (continued)

         Sensitivitas  dari   imbalan    pemeliharaan                          The sensitivity of the health care benefits to
         kesehatan terhadap perubahan asumsi                                   changes in the weighted principal assumptions is
         aktuarial utama adalah sebagai berikut:                               as follows:

                                                 Dampak atas imbalan pemeliharaan kesehatan/
                                                       Impact on health care benefits
                                            Perubahan             Kenaikan            Penurunan
                                              asumsi/              asumsi/              asumsi/
                                             Change in           Increase in          Decrease in
                                            assumption          assumption            assumption

         Tingkat diskonto                      1%                          4,055,072             (8,756,680)                  Discount rate
         Tingkat kenaikan biaya kesehatan      1%                         (7,205,491)             4,718,329             Medical inflation rate


    iv. Imbalan kerja jangka panjang lainnya                              iv. Other long-term benefits

         Pergerakan kewajiban imbalan kerja jangka                              The movement in the other long-term benefits
         panjang lainnya selama tahun berjalan adalah                           obligation over the year is as follows:
         sebagai berikut:


                                                      30 Juni/                 31 Desember/
                                                      June 30,                 December 31,
                                                        2025                       2024
         Saldo awal                                      772,966                  743,295                            Beginning balance
         Dibebankan ke laba rugi:                                                                           Charged to profit and loss:
           Beban jasa kini                                101,591                  189,131                     Current service cost
           Biaya bunga                                     27,579                   34,295                        Interest expense
         Kerugian aktuarial yang timbul dari                                                                      Loss from change in
           perubahan asumsi keuangan                          (71)                 (12,037)                  financial assumptions
         Kerugian/(keuntungan) aktuarial yang                                                          Loss/(gain) from combination of
           timbul dari kombinasi perubahan                         -                      (19)               changes in assumptios
         asumsi
         Kerugian/(Keuntungan) dari penyesuaian
           atas pengalaman                                    994                       13,352                 Experience loss/(gain)
         Kerugian yang timbul dari perubahan                                                                     Loss from change in
           asumsi demografis                                    -                     5,129               demographic assumptions
                                                          130,093                   229,851
         Pembayaran manfaat                             (151,932)                 (200,180)                            Benefit Payment

         Saldo akhir                                      751,127                  772,966                             Ending balance


         Asumsi aktuarial utama yang digunakan adalah                           The principal actuarial assumptions used were
         sebagai berikut:                                                       as follows:


                                                      30 Juni/               31 Desember/
                                                      June 30,               December 31,
                                                        2025                     2024
         Tingkat diskonto                          6.97% - 7.14%             6.47% - 7.02%                                   Discount rate
         Tingkat kenaikan gaji per tahun               7.12%                 5.00% - 7.12%                     Rate of salary increase per
                                                                                                                                   annum
Page 153
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/143 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                             NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                    FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                               JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)           (Expressed in millions of Rupiah, unless otherwise stated)

49. LIABILITAS IMBALAN KERJA (lanjutan)                           49. EMPLOYEE BENEFITS LIABILITIES (continued)

    iv. Imbalan kerja            jangka   panjang    lainnya            iv. Other long-term benefits (continued)
        (lanjutan)

         Sensitivitas dari imbalan kerja jangka panjang                       The sensitivity of the other long-term benefits to
         lainnya terhadap perubahan asumsi aktuarial                          changes in the weighted principal assumptions is
         utama adalah sebagai berikut:                                        as follows:

                                               Dampak atas imbalan kerja jangka panjang lainnya/
                                                       Impact on other long-term benefits
                                            Perubahan              Kenaikan               Penurunan
                                              asumsi/               asumsi/                 asumsi/
                                             Change in            Increase in             Decrease in
                                            assumption            assumption              assumption

         Tingkat diskonto                       1%                          24,066                (25,399)               Discount rate
         Tingkat kenaikan gaji                  1%                         (27,124)                26,099           Salary growth rate

    Grup terekspos dengan beberapa risiko melalui                       The Group is exposed to a number of risks through its
    program manfaat pasti dan program kesehatan                         defined benefit pension program and post-
    pascakerja. Risiko yang paling signifikan adalah                    employment medical plans. The most significant risks
    sebagai berikut:                                                    are as follows:

    Volatilitas aset                                                    Asset volatility

    Kewajiban program dihitung menggunakan tingkat                      The plan liabilities are calculated using a discount rate
    diskonto yang merujuk kepada Zero Coupon Bond                       set with reference to the Zero Coupon Bond from
    dari Indonesia Government Securities Yield Curve.                   Indonesia Government Securities Yield Curve. If plan
    Jika imbal hasil aset program lebih rendah, maka                    assets underperform this yield, this will create a deficit.
    akan menghasilkan defisit program.

    Grup mengalokasikan investasi aset program ke                       The Group allocates its investment plan assets across
    berbagai      jenis  instrumen      investasi untuk                 various types of investment instruments to ensure
    memastikan diversifikasi yang tepat, meminimalkan                   proper diversification, minimizing the impact of poor
    dampak kinerja buruk dari satu aset terhadap                        performance from any single asset on the entire
    seluruh portofolio. Sementara bagian terbesar dari                  portfolio. While the largest portion of assets is invested
    aset diinvestasikan dalam instrumen utang. Grup                     in debt instruments, the Group also allocates funds to
    juga mengalokasikan dana ke rekening tabungan,                      savings accounts, time deposits, equity instruments
    deposito berjangka, instrumen ekuitas, dan properti.                and property. The Group believes that debt
    Grup percaya bahwa instrumen utang memberikan                       instruments provide the best long-term returns with an
    pengembalian jangka panjang terbaik dengan                          acceptable level of risk.
    tingkat risiko yang dapat diterima.

    Harapan umur hidup                                                  Life expectancy

    Sebagian     besar      dari kewajiban program                      The majority of the plans’ obligations are to provide
    menyediakan manfaat seumur hidup sehingga                           benefits for the life of the members, so increases in life
    kenaikan harapan umur hidup akan mengakibatkan                      expectancy will result in an increase in the plans’
    kenaikan liabilitas program.                                        liabilities.

    Rata-rata durasi kewajiban manfaat pasti untuk                      The weighted average duration of the defined benefit
    program pensiun, imbalan pascakerja lainnya,                        obligations for the pension program, other post-
    imbalan pemeliharaan kesehatan, dan imbalan                         employment benefits program, healthcare benefits,
    kerja jangka panjang lainnya adalah 6,46 – 17.24                    and other long-term benefits are 6.46 – 17.24 years,
    tahun, 7,13 - 17,89 tahun, 7.14 - 24,42 tahun, dan                  7.13 – 17.89 years, 7.14 - 24.42 years, and 2.74 – 6.99
    2,74 - 6,99 tahun secara berurutan.                                 years, respectively.

    Manajemen Grup berpendapat bahwa liabilitas                         The management of the Group believes that the
    imbalan pascakerja cukup untuk menutupi semua                       estimated liability provided for post-employment
    imbalan    yang    diatur   dalam    Peraturan                      benefits is adequate to cover the requirements of the
    Ketenagakerjaan dan/atau PKB.                                       Manpower Regulations and/or the CLA.
Page 154
                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                    Lampiran 5/144 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                 NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                        FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                   JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)               (Expressed in millions of Rupiah, unless otherwise stated)

49. LIABILITAS IMBALAN KERJA (lanjutan)                                49. EMPLOYEE BENEFITS LIABILITIES (continued)

    Harapan umur hidup (lanjutan)                                           Life expectancy (continued)

    Analisis jatuh tempo yang diharapkan dari imbalan                       The expected maturity analysis of undiscounted post-
    pascakerja dan imbalan jangka panjang lainnya                           employment benefits and other long-term benefits is as
    yang tidak terdiskonto adalah sebagai berikut:                          follows:

                                Kurang dari      Antara 1 - 2    Antara 2 - 5        Lebih dari
                                  1 tahun/         tahun/          tahun/             5 tahun/
                                 Less than        Between         Between            More than
                                   a year        1 - 2 years     2 - 5 years          5 years      Jumlah/Total

    Program pensiun manfaat pasti   1,410,428       1,244,966       3,421,409          8,852,490     14,929,293 Defined benefit pension program
    Imbalan pascakerja lainnya      1,332,737       1,340,990       3,066,502         73,037,727     78,777,956 Other post-employment benefits
    Imbalan pemeliharaan
     kesehatan                       231,333        9,593,042       3,990,396         83,461,122     97,275,893             Health care benefits
    Imbalan kerja jangka panjang
     lainnya                          68,809          363,252         580,682            324,969       1,337,712        Other long-term benefits

     Jumlah                         3,043,307      12,542,250      11,058,989        165,676,308    192,320,854                            Total



50. INFORMASI ARUS KAS                                                 50. CASH FLOWS INFORMATION

    a.   Transaksi nonkas                                                       a.    Non-cash transactions

         Tabel di bawah ini menjelaskan perubahan                                     The table below details changes in the Group’s
         dalam liabilitas Grup yang timbul dari aktivitas                             liabilities arising from investing and financing
         investasi dan pendanaan, termasuk perubahan                                  activities, including both cash and non-cash
         yang timbul dari arus kas dan perubahan                                      changes. Liabilities arising from financing
         nonkas. Liabilitas yang timbul dari aktivitas                                activities are those for which cash flows were, or
         pendanaan adalah liabilitas yang arus kas, atau                              future cash flows will be, classified in the Group’s
         arus kas masa depannya, diklasifikasikan                                     consolidated statements of cash flows as cash
         dalam laporan arus kas konsolidasian Grup                                    flows from financing activities.
         sebagai arus kas dari aktivitas pendanaan.

         Pengungkapan tambahan                   atas aktivitas                       Supplemental disclosures on non-cash investing
         investasi dan pendanaan                nonkas adalah                         and financing activities are as follows:
         sebagai berikut:


                                                             2025                          2024
                                                        (Enam bulan/                  (Enam bulan/
                                                         Six months)                   Six months)

         Aktivitas investasi dan pendanaan                                                                           Non-cash investing and
           yang tidak mempengaruhi kas:                                                                                financing activities:
         Perolehan aset tetap dan pekerjaan                                                                    Additions to property, plant and
          dalam pelaksanaan melalui                                                                             equipment and construction
          penarikan pinjaman dan utang proyek                   7,502,788                  6,994,779           in progress through drawdown
                                                                                                                                        of loans
         Penambahan aset hak guna                                                                             Addition of right-of-use assets
           melalui utang sewa                                    646,974                   2,548,527                 through lease liabilities
Page 155
                     PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                  DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                  Lampiran 5/145 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                   NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                          FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                                     JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                 (Expressed in millions of Rupiah, unless otherwise stated)

50. INFORMASI ARUS KAS (lanjutan)                                                        50. CASH FLOWS INFORMATION (continued)

    b.   Rekonsiliasi liabilitas yang timbul dari                                              b.       Reconciliation of liabilities arising from
         aktivitas pendanaan                                                                            financing activities

         Liabilitas yang timbul dari aktivitas pendanaan                                                The reconciliation of liabilities arising from
         untuk tahun yang berakhir pada tanggal 30 Juni                                                 financing activities for the years ended June 30,
         2025 dan 31 Desember 2024 adalah sebagai                                                       2025 and December 31, 2024, is as follows:
         berikut:

                                                                                  30 Juni/June 30, 2025
                                                 Saldo awal/                                                Perubahan          Saldo Akhir/
                                              Beginning balance       Penambahan/        Pembayaran/         lainnya/            Ending
          Penerusan Pinjaman                           26,036,940              29,198      (1,536,515)        1,264,785          25,794,408                         Two-step loans
          Utang kepada pemerintah dan                                                                                                                    Government and non-bank
         lembaga keuangan pemerintah                    2,842,807            3,351,353       (375,000)             (7,860)         5,811,300         government financial institution
         non-bank                                                                                                                                                              loans
          Utang Bank                                 157,229,662         20,609,615       (31,671,351)        4,751,724         150,919,650                             Bank Loans
          Utang obligasi dan sukuk ijarah            199,059,243                -            (649,785)        3,101,614         201,511,073          Bonds payable and sukuk ijara
          Utang sewa pembiayaan                       12,895,913                              (78,763)         (426,137)         12,391,013                          Lease liabilities
          Utang Listrik Swasta                         5,338,434                             (308,028)           27,938           5,058,344            Electricity purchase payable
          Jumlah                                     403,402,999         23,990,166       (34,619,442)        8,712,064         401,485,788                                   Total

         *) Termasuk perubahan selisih kurs dan amortisasi biaya transaksi                     *)   Including foreign exchange difference and amortisation of transaction costs

                                                                           31 Desember/December 31, 2024
                                                                                                   Perubahan
                                                    Saldo awal/                                      lainnya/                Saldo akhir/
                                                    Beginning       Penambahan/    Pembayaran/        Other                    Ending
                                                     balance          Additions    Repayments       changes*)                 balance

         Penerusan pinjaman                          29,183,428               30,710      (2,949,638)         (227,560)       26,036,940                             Two-step loans
         Utang kepada lembaga keuangan                                                                                                              Non-bank Government financial
          Pemerintah nonbank                          2,222,907         1,355,066           (750,000)           14,834         2,842,807                           institution loans
         Utang bank                                 148,822,188        66,871,547        (60,229,180)        1,765,107       157,229,662                                  Bank loans
         Utang obligasi dan sukuk ijarah            197,564,833                 -         (5,553,934)        7,048,344       199,059,243             Bonds payable and sukuk ijara
         Utang sewa                                  12,769,530         3,124,484         (2,933,531)          (64,570)       12,895,913                             Lease liabilities
         Utang listrik swasta                         5,655,807                 -           (569,372)          251,999         5,338,434              Electricity purchase payables

         Jumlah                                     396,218,693        71,381,807        (72,985,655)        8,788,154       403,402,999                                          Total

         *) Termasuk perubahan selisih kurs dan amortisasi biaya transaksi                     *)   Including foreign exchange difference and amortisation of transaction costs




51. TRANSAKSI DAN SALDO DENGAN PIHAK                                                     51. TRANSACTIONS    AND                                 BALANCES                   WITH
    BERELASI                                                                                 RELATED PARTIES

    Sifat hubungan berelasi                                                                    Nature of related parties

    a.   Pemerintah, dalam hal ini adalah Menteri                                              a.       The Government, in this case is the Minister of
         Keuangan      Republik    Indonesia    yang                                                    Finance of the Republic of Indonesia, the
         merupakan pemegang saham Perusahaan dan                                                        shareholder of the Company and SOEs.
         BUMN.
    b.   Perusahaan mempunyai hubungan berelasi                                                b.       The Company is related to other SOEs owned by
         dengan BUMN lainnya yang dimiliki bersama                                                      the Ministry of Finance.
         oleh Kementerian Keuangan.
    c.   Grup mempunyai pengaruh signifikan atas                                               c.       The Group has significant influence on
         investasi pada entitas asosiasi atau ventura                                                   investments in associates or joint ventures
         bersama (Catatan 9).                                                                           (Note 9).
    d.   Dewan Komisaris dan Direksi merupakan                                                 d.       The Board of Commissioners and Directors are
         personil manajemen kunci Grup.                                                                 members of the key management of the Group.
Page 156
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                    Lampiran 5/146 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                 NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                        FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                   JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)               (Expressed in millions of Rupiah, unless otherwise stated)

51. TRANSAKSI DAN SALDO DENGAN PIHAK                                   51. TRANSACTIONS    AND      BALANCES                            WITH
    BERELASI (lanjutan)                                                    RELATED PARTIES (continued)

    Sifat hubungan berelasi (lanjutan)                                       Nature of related parties (continued)

    Berikut ini adalah daftar pihak berelasi yang                            Below is the list of related parties that engage in
    memiliki transaksi dengan Grup:                                          transactions with the Group:
                Pihak-pihak berelasi/                    Sifat hubungan/                                    Sifat transaksi/
                   Related parties                     Nature of relationship                            Nature of transaction
    Pemerintah Republik Indonesia/             Pemegang saham akhir/                   Penerimaan subsidi listrik dan kompensasi, penerimaan
    Government of the Republic of Indonesia    Ultimate shareholder                    penerusan pinjaman, dan utang kepada pemerintah/
                                                                                       Receipt of electricity subsidy and compensation, two-step
                                                                                       loan and Government loans

    BRI                                        Pengendalian melalui Pemerintah         Penempatan rekening bank dan deposito berjangka
                                               Republik Indonesia/                     dibatasi penggunaannya, kas dan setara kas, investasi
                                               Control through the Government of the   jangka pendek, dan penerimaan utang bank/
                                               Republic of Indonesia                   Placement of restricted cash in banks and time deposits,
                                                                                       cash and cash equivalents, short-term investments, and
                                                                                       receipt of bank loans

    Bank Mandiri                               Pengendalian melalui Pemerintah         Penempatan rekening bank dan deposito berjangka
                                               Republik Indonesia/                     dibatasi penggunaannya, kas dan setara kas, investasi
                                               Control through the Government of the   jangka pendek, dan penerimaan utang bank/
                                               Republic of Indonesia                   Placement of restricted cash in banks and time deposits,
                                                                                       cash and cash equivalents, short-term investments, and
                                                                                       receipt of bank loans

    BNI                                        Pengendalian melalui Pemerintah         Penempatan rekening bank dan deposito berjangka
                                               Republik Indonesia/                     dibatasi penggunaannya, kas dan setara kas, dan
                                               Control through the Government of the   penerimaan utang bank/
                                               Republic of Indonesia                   Placement of restricted cash in banks and time deposits,
                                                                                       cash and cash equivalents, and receipt of bank loans

    Bank DKI                                   Entitas yang berhubungan dengan         Penempatan kas dan setara kas dan penerimaan
                                               Pemerintah/                             utang bank/Placement of cash and cash equivalents and
                                               Government related entity               receipt of bank loans

    Bank Pembangunan Daerah (“BPD”)            Entitas yang berhubungan dengan         Penempatan kas dan setara kas dan penerimaan
                                               Pemerintah/                             utang bank/Placement of cash and cash equivalents and
                                               Government related entity               receipt of bank loans

    BTN                                        Pengendalian melalui Pemerintah         Penempatan kas dan setara kas dan penerimaan utang
                                               Republik Indonesia/                     bank/Placement of cash and cash equivalents and
                                               Control through the Government of the   receipt of bank loans
                                               Republic of Indonesia

    BSI                                        Pengendalian melalui Pemerintah         Penempatan kas dan setara kas dan penerimaan utang
                                               Republik Indonesia/                     bank/Placement of cash and cash equivalents and
                                               Control through the Government of the   receipt of bank loans
                                               Republic of Indonesia

    LPEI                                       Pengendalian melalui Pemerintah         Penerimaan utang bank/Receipt of bank loans
                                               Republik Indonesia/
                                               Control through the Government of the
                                               Republic of Indonesia

    PT Indonesia Asahan Aluminium (“Inalum”)   Pengendalian melalui Pemerintah         Transaksi pembelian tenaga listrik/
                                               Republik Indonesia/                     Purchase of electricity
                                               Control through the Government of
                                               the Republic of Indonesia

    PT Pertamina Geothermal Energy (“PGE”)     Pengendalian melalui Pemerintah         Transaksi pembelian tenaga listrik/
                                               Republik Indonesia/                     Purchase of electricity
                                               Control through the Government of the
                                               Republic of Indonesia

    Pertamina                                  Pengendalian melalui Pemerintah         Transaksi pembelian bahan bakar dan minyak pelumas/
                                               Republik Indonesia/                     Purchase of fuels and lubricants
                                               Control through the Government of the
                                               Republic of Indonesia

    PT Pertamina Gas (“Pertagas”)              Pengendalian melalui Pemerintah         Transaksi pembelian bahan bakar gas/
                                               Republik Indonesia/                     Purchase of gas
                                               Control through the Government of the
                                               Republic of Indonesia

    PT Bukit Asam Tbk (“PTBA”)                 Pengendalian melalui Pemerintah         Transaksi pembelian bahan bakar batubara/
                                               Republik Indonesia/                     Purchase of coal
                                               Control through the Government of the
                                               Republic of Indonesia

    PT Perusahaan Gas Negara (Persero) Tbk     Pengendalian melalui Pemerintah         Transaksi pembelian bahan bakar gas/
     (“PGN”)                                   Republik Indonesia/                     Purchase of gas
                                               Control through the Government of the
                                               Republic of Indonesia
Page 157
                       PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                    DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                        Lampiran 5/147 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                          NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                 FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                            JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                        (Expressed in millions of Rupiah, unless otherwise stated)

51. TRANSAKSI DAN SALDO DENGAN PIHAK                                            51. TRANSACTIONS    AND      BALANCES                                  WITH
    BERELASI (lanjutan)                                                             RELATED PARTIES (continued)

    Sifat hubungan berelasi (lanjutan)                                                Nature of related parties (continued)

    Berikut ini adalah daftar pihak berelasi yang                                     Below is the list of related parties that engage in
    memiliki transaksi dengan Grup: (lanjutan)                                        transactions with the Group: (continued)
                 Pihak-pihak berelasi/                         Sifat hubungan/                                     Sifat transaksi dan saldo/
                       Related parties                       Nature of relationship                           Nature of transaction and balance

    PT Asuransi Jasa Indonesia (Persero) (“AJI”)   Pengendalian melalui Pemerintah              Asuransi bangunan, instalasi dan mesin pembangkit,
                                                   Republik Indonesia/                          perlengkapan transmisi serta kapal milik Perusahaan/
                                                   Control through the Government of the        Insurance services for the Company's buildings,
                                                   Republic of Indonesia                        installation and power plant, transmission equipment
                                                                                                and vessels

    Perum Jasa Tirta                               Pengendalian melalui Pemerintah              Transaksi pembelian tenaga listrik/
                                                   Republik Indonesia/                          Purchase of electricity
                                                   Control through the Government of the
                                                   Republic of Indonesia

    SMI                                            Pengendalian melalui Pemerintah              Penerimaan utang dari lembaga
                                                   Republik Indonesia/                          keuangan pemerintah nonbank/
                                                   Control through the Government of the        Receipt of non-bank government financial institution loans
                                                   Republic of Indonesia

    GDE                                            Entitas asosiasi/Associate                   Transaksi pembelian tenaga listrik/Purchase of electricity

    TJK                                            Entitas asosiasi/Associate                   Transaksi pembelian tenaga listrik/Purchase of electricity

    DEB                                            Entitas asosiasi/Associate                   Transaksi pembelian tenaga listrik/Purchase of electricity

    MEB                                            Entitas asosiasi/Associate                   Transaksi pembelian tenaga listrik/Purchase of electricity

    RDM                                            Entitas asosiasi/Associate                   Transaksi pembelian tenaga listrik/Purchase of electricity

    S2P                                            Entitas asosiasi/Associate                   Transaksi pembelian tenaga listrik/Purchase of electricity

    IPB                                            Entitas asosiasi/Associate                   Pemberian pinjaman jangka panjang/
                                                                                                Issuance of long-term loans

    BDSN                                           Ventura bersama/Joint venture                Transaksi pembelian tenaga listrik/Purchase of electricity

    Komipo PJB                                     Ventura bersama/Joint venture                Transaksi pembelian tenaga listrik/Purchase of electricity

    BPI                                            Ventura bersama/Joint venture                Transaksi pembelian tenaga listrik/Purchase of electricity

    SGPJB                                          Ventura bersama/Joint venture                Pemberian pinjaman jangka panjang dan transaksi
                                                                                                pembelian tenaga listrik/Issuance of long-term loans
                                                                                                and purchase of electricity

    PDG                                            Ventura bersama/Joint venture                Pemberian pinjaman jangka panjang/
                                                                                                Issuance of long-term loans

    PMSE                                           Ventura bersama/Joint venture                Pemberian pinjaman jangka panjang/
                                                                                                Issuance of long-term loans

    REP                                            Ventura bersama/Joint venture                Pemberian pinjaman jangka panjang dan transaksi
                                                                                                pembelian tenaga listrik/Issuance of long-term loans
                                                                                                and purchase of electricity

    GCL                                            Ventura bersama/Joint venture                Pemberian pinjaman jangka panjang/
                                                                                                Issuance of long-term loans

    PT Waskita Karya (Persero) Tbk (“Waskita”)     Pengendalian melalui Pemerintah              Transaksi jasa konstruksi/
                                                   Republik Indonesia/                          Construction services
                                                   Control through the Government of
                                                   the Republic of Indonesia

    PT Wijaya Karya (Persero) Tbk (“Wika”)         Pengendalian melalui Pemerintah              Transaksi jasa konstruksi/
                                                   Republik Indonesia/                          Construction services
                                                   Control through the Government of
                                                   the Republic of Indonesia

    PT Pelabuhan Indonesia (Persero)               Pengendalian melalui Pemerintah              Sewa/
                                                   Republik Indonesia/                          Lease
                                                   Control through the Government of
                                                   the Republic of Indonesia

    Dana Pensiun PLN                               Pengendalian melalui Pemerintah              Sewa/
                                                   Republik Indonesia/                          Lease
                                                   Control through the Government of
                                                   the Republic of Indonesia

    Pemerintah Daerah                              Entitas yang berhubungan dengan              Utang lain-lain/
                                                   Pemerintah/Government related entity         Other payables

    Pemerintah Pusat                               Entitas yang berhubungan dengan              Pendapatan usaha lain-lain/
                                                   Pemerintah/Government related entity         Other revenues
Page 158
                       PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                    DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                            Lampiran 5/148 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                       FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                                  JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                              (Expressed in millions of Rupiah, unless otherwise stated)

51. TRANSAKSI DAN SALDO DENGAN PIHAK                                              51. TRANSACTIONS    AND      BALANCES                                                WITH
    BERELASI (lanjutan)                                                               RELATED PARTIES (continued)

    Rincian transaksi dan saldo dengan pihak                                                  Details of transactions and balances with related
    berelasi:                                                                                 parties:
                                                 Catatan/    30 Juni/June 30, 2025              31 Desember/December 31, 2024
                                                  Notes      Rp                 % *)                 Rp             % *)

     Piutang pihak berelasi                        10                                                                                           Receivables from related parties
       SGPJB                                                   360,243                 0.02            440,009               0.03                                      SGPJB
       REP                                                     501,218                 0.03            485,856               0.03                                        REP
       GCL                                                      22,769                 0.00            123,836               0.01                                        GCL
       PDG                                                           -                  -                    -                -                                          PDG
       PMSE                                                    144,064                 0.00            139,520               0.01                                       PMSE
       IPB                                                       2,553                 0.00                  -                -                                           IPB
       Lain lain                                               107,435                 0.01             86,895               0.00                                      Others
       Subjumlah                                              1,138,282                0.06           1,276,116              0.08                                      Subtotal

     Rekening bank dan deposito berjangka          11
       dibatasi penggunaannya                                                                                                        Restricted cash in banks and time deposits
       Bank Mandiri                                             56,559                 0.00             87,550                0.00                               Bank Mandiri
       BNI                                                      68,056                 0.00             20,272                0.00                                        BNI
       BRI                                                      55,979                 0.00             70,979                0.00                                        BRI
       BPD Jatim                                                                        -              178,801                0.01                                  BPD Jatim
       Subjumlah                                               180,593                 0.01            357,602               0.01                                      Subtotal

     Kas dan setara kas                            13                                                                                                 Cash and cash equivalents
       BNI                                                   16,680,485                0.93          14,248,526              0.80                                         BNI
       BRI                                                   12,942,093                0.72          19,121,775              1.08                                         BRI
       Bank Mandiri                                          11,461,538                0.64          16,691,534              0.94                                Bank Mandiri
       BSI                                                    1,388,882                0.08           1,633,549              0.09                                         BSI
       BTN                                                      340,958                0.02           3,473,404              0.20                                        BTN
       Bank DKI                                                 222,397                0.01             545,683              0.03                                    Bank DKI
       Subjumlah                                             43,036,353                2.40          55,714,471              3.14                                      Subtotal

     Investasi jangka pendek                       14                                                                                                     Short-term investment
       BRI                                                       19,303                0.00            943,860               0.05                                         BRI
       Bank Mandiri                                           1,096,005                0.06              1,603               0.00                                 Bank Mandiri
       BNI                                                      135,227                0.01             31,637               0.00                                         BNI

       Subjumlah                                              1,250,536                0.01            977,100               0.06                                      Subtotal

     Piutang usaha                                 15                                                                                                 Trade accounts receivable
       Entitas yang berelasi dengan Pemerintah                3,018,180                0.17           2,648,312              0.15                      State-Owned Enterprises

     Piutang Pemerintah                            16        78,448,850                4.37          43,290,748              2.45                 Receivables from Government
     Jumlah                                                 127,072,794                7.00         104,264,349              5.87                                        Total

     Penerusan pinjaman                            24        25,794,408                3.51          26,036,940              3.64                                 Two-step loans

     Utang kepada Pemerintah dan lembaga                                                                                                 Government and non-bank Government
       keuangan Pemerintah non-Bank                25                                                                                              financial institution loans
       SMI                                                    2,459,947                0.34           2,842,807              0.40                                          SMI
       Danantara                                              3,351,352                0.46                   -               -                                     Danantara
     Subjumlah                                                5,811,299                0.79           2,842,807              0.40                                        Subtotal

     Utang Sewa                                    26                                                                                                        Lease Liabilities
     PT Pelabuhan Indonesia (Persero)                         1,296,360                0.18           1,157,553              0.16           PT Pelabuhan Indonesia (Persero)
     Dana Pensiun PLN                                           817,615                0.11             889,744              0.13                         Dana Pensiun PLN
     Lain-lain                                                  186,089                0.03             460,960              0.06                                    Others
     Subjumlah                                                2,300,064                0.31           2,508,257              0.34                                        Subtotal
                                                                                        -
     Utang bank                                    27                                   -                                                                            Bank loans
       Bank Mandiri                                          11,950,213                1.63          12,620,115              1.78                                 Bank Mandiri
       BNI                                                    8,224,785                1.12           8,538,191              1.20                                          BNI
       BRI                                                    4,376,875                0.60           5,147,814              0.73                                          BRI
       BTN                                                    4,959,764                0.68           5,130,351              0.72                                         BTN
       BSI                                                    4,471,220                0.61           4,613,129              0.65                                          BSI
       SMI                                                      966,759                0.13           1,175,917              0.17                                          SMI
       BPD Papua                                                241,071                0.03             273,214              0.04                                  BPD Papua
       Bank DKI                                                  41,071                0.01             123,214              0.02                                    Bank DKI
       LPEI                                                     107,760                0.01             196,656              0.03                                         LPEI
       Bank Jateng                                                7,143                0.00              21,429              0.00                                  Bank Jateng
       BPD Aceh                                                   3,571                0.00              10,714              0.00                                   BPD Aceh
       Bank Kalteng                                               3,571                0.00              10,714              0.00                                 Bank Kalteng
       Bank Riau                                                  3,571                0.00              10,714              0.00                                   Bank Riau
       Bank Kalbar                                                3,571                0.00              10,714              0.00                                  Bank Kalbar
       BPD Bali                                                   2,679                0.00               8,036              0.00                                    BPD Bali
       Subjumlah                                             35,363,624                3.19          37,890,922              5.33                                      Subtotal

    *) Persentase terhadap jumlah aset/liabilitas/pendapatan/beban yang                        *)   Percentage to related total assets/liabilities/revenues/expenses
       bersangkutan
Page 159
                         PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                      DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                             Lampiran 5/149 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                               NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                      FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                                 JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                             (Expressed in millions of Rupiah, unless otherwise stated)

51. TRANSAKSI DAN SALDO DENGAN PIHAK                                              51. TRANSACTIONS    AND      BALANCES                                                 WITH
    BERELASI (lanjutan)                                                               RELATED PARTIES (continued)

    Rincian transaksi dan saldo dengan pihak                                                 Details of transactions and balances with related
    berelasi: (lanjutan)                                                                     parties: (continued)
                                              Catatan/      30 Juni/June 30, 2025             31 Desember/December 31, 2024
                                               Notes        Rp                 % *)                Rp             % *)

    Utang usaha                                 30                                                                                                       Trade accounts payable
      Pertamina Grup                                        23,360,916                3.18          14,089,594              1.98                               Pertamina Group
      S2P                                                    2,491,124                0.34           2,255,344              0.32                                            S2P
      PTBA                                                   3,053,129                0.42           2,024,175              0.28                                           PTBA
      SGPJB                                                  2,193,020                0.30           1,727,318              0.24                                          SGPJB
      Lain-lain (masing - masing dibawah 5%                                                                                                       Others (each below 5% of total
        dari jumlah utang usaha)                                                                                                                      trade accounts payable)
        Pengendalian melalui Pemerintah                                                                                                   Control through the Government of the
           Republik Indonesia                                  938,497                0.13             994,074              0.14                           Republic of Indonesia
        Ventura Bersama                                      1,110,817                0.15           1,179,126              0.17                                  Joint ventures
        Entitas asosiasi                                       773,801                0.11             442,869              0.06                                     Associates
      Subjumlah                                             33,921,304                4.62          22,712,501              3.19                                         Subtotal

    Utang lain-lain                             31                                                                                                             Other payables
      Pemerintah Daerah                                      3,176,537                0.43           3,180,744              0.45                             Local Government
      WK                                                       251,274                0.03             251,274              0.03                                          WK
      WIKA                                                     452,207                0.06             361,097              0.04                                        WIKA
      Lainnya                                                  476,749                0.06             542,970              0.07                                       Others

      Subjumlah                                              4,356,768                0.16           4,336,085              0.61                                       Subtotal

    Biaya masih harus dibayar                   30                                                                                                            Accrued expenses
      Biaya operasional                                                                                                                                      Accrued expenses
        Asuransi Perisai Listrik Nasional                    1,620,805                0.22           3,071,110              0.43                        Operational expenses
      Penerusan pinjaman                                       266,894                0.04             303,559              0.04                                Two-step loans
      Utang bank                                                                                                                                                     Bank loans
        BNI                                                    126,239                0.02            101,828               0.01                                         BNI
        Bank Mandiri                                           143,014                0.02            150,316               0.02                                Bank Mandiri
        BSI                                                     82,630                0.01             65,173               0.01                                         BSI
        BRI                                                     44,939                0.01             45,220               0.01                                         BRI
        BTN                                                     57,006                0.01             53,177               0.01                                        BTN
        Bank DKI                                                    45                0.00                173               0.00                                    Bank DKI
        SMI                                                      2,042                0.00              2,798               0.00                                         SMI

      Utang kepada Pemerintah dan lembaga                                                                                                Government and non-bank Government
        keuangan pemerintah nonbank                              1,757                0.00               2,008              0.00                   financial institution loans
        LPEI                                                       360                0.00                 596              0.00                                          LPEI
        Lain-lain                                                  315                0.00                 473              0.00                                       Others
      Subjumlah                                              2,346,046                0.10           3,796,431              0.53                                        Subtotal
    Jumlah                                                 109,893,568                5.84         100,123,998             14.04                                             Total



                                                Catatan/   30 Juni/June 30, 2025                    30 Juni / June 30, 2024
                                                 Notes        Rp              % *)                   Rp                 % *)

   Penjualan tenaga listrik                          36                                                                                                     Sale of electricity
     Entitas yang berelasi dengan Pemerintah                11,192,413          6.23                11,087,001                 6.45                 State-Owned Enterprises
   Subsidi listrik Pemerintah                        37     40,091,369           100                37,266,626              100.00          Government's electricity subsidy

   Pendapatan kompensasi                             16     55,113,607           100                46,493,492                  100                     Compensation income

   Pendapatan usaha lain lain                        38                                                                                                        Other Revenues
     SGPJB                                                     870,511         14.38                   728,895                12.81                                  SGPJB
     GCL                                                        62,725          1.04                    54,788                 0.96                                     GCL
     S2P                                                         6,093          0.10                    64,390                 1.13                                     S2P
     Lain lain                                                 542,071          8.96                   287,273                 5.05                                   Others

   Jumlah                                                    1,481,400         24.48                 1,135,346                19.96                                         Total

   Beban bahan bakar dan pelumas                     39                                                                                          Fuel and lubricants expense
     Pertamina Group                                        33,739,133         13.42                31,048,891                13.29                        Pertamina Group
     PTBA                                                    6,421,302          2.55                 4,665,083                 2.00                                   PTBA
     Lainnya                                                   369,731          0.15                    82,344                 0.04                                  Others
   Jumlah                                                   40,530,166         16.13                35,796,319                15.33                                         Total

    *) Persentase terhadap jumlah aset/liabilitas/pendapatan/beban yang                       *)    Percentage to related total assets/liabilities/revenues/expenses
       bersangkutan
Page 160
                      PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                   DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                             Lampiran 5/150 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                               NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                      FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                                 JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                             (Expressed in millions of Rupiah, unless otherwise stated)

51. TRANSAKSI DAN SALDO DENGAN PIHAK                                             51. TRANSACTIONS    AND      BALANCES                                           WITH
    BERELASI (lanjutan)                                                              RELATED PARTIES (continued)

    Rincian transaksi dan saldo dengan pihak                                             Details of transactions and balances with related
    berelasi: (lanjutan)                                                                 parties: (continued)

                                              Catatan/      30 Juni/June 30, 2025               30 Juni / June 30, 2024
                                               Notes           Rp              % *)              Rp                 % *)
    Beban pembelian tenaga listrik               40                                                                                        Purchased electricity expenses
      SSP                                                      7,046,017         7.74             6,964,459                 7.98                                    SSP
      SGPJB                                                    6,317,268         6.94             6,101,566                 6.99                                 SGPJB
      PGE                                                      1,990,232         2.19             1,950,590                 2.24                                   PGE
      BPI                                                        783,990         0.86               693,556                 0.79                                     BPI
      Lainnya                                                  3,922,081         4.31             2,009,830                 2.30                                  Others
    Jumlah                                                    20,059,588        22.03           17,720,001                20.31                                     Total

    Beban pemeliharaan                           42                                                                                                 Maintenance expenses
      KOMIPO PJB                                                 143,635         1.03                27,917                 0.21                           KOMIPO PJB
      Lainnya                                                    114,603         0.82               467,323                 3.58                                 Others
         Jumlah                                                  258,238         1.85               495,241                 3.80                                  Total

    Beban usaha lain-lain                        44                                                                                              Other operating expenses
      Asuransi                                                                                                                                                  Insirance
      AJI                                                          3,130         0.07                 5,620                 0.12                                      AJI
      Lain - lain                                                277,083         5.85               273,707                 5.66                                  Others

    Jumlah                                                       280,214         5.92               279,327                 5.77                                    Total
    Beban keuangan                               45                                                                                                        Financial cost
    Utang Bank                                                 1,274,395        11.19             1,266,575               12.10                                Bank Loans
    Penerusan Pinjaman                                           581,122         5.10               424,828                4.06                          Two - Step Loans
    Instrumen derivatif                                         (326,528)       (2.87)             (965,287)              (9.22)                     Derivative Instrumen
    Utang Kepada Pemerintah dan Lembaga                                                                                             Government and non-bank Government
      Keuangan Pemerintah non - Bank                              62,482         0.55                62,856                 0.60               inancial institution loans
         Jumlah                                                1,591,471        13.98               788,972                 7.54                                  Total

    *)      Persentase terhadap jumlah aset/liabilitas/pendapatan/beban yang             *)   Percentage to related total assets/liabilities/revenues/expenses
            bersangkutan




    Jumlah kompensasi Dewan Komisaris Perusahaan                                         Total compensation of the Company’s Board of
    untuk periode enam bulan yang berakhir pada                                          Commissioners for the six month periods ended June
    tanggal 30 Juni 2025 dan 31 Desember 2024,                                           30, 2025 and December 31, 2024 amounted to
    masing-masing adalah sebesar Rp24.787 dan                                            Rp24,787 and Rp191,568, respectively.
    Rp191.568.

    Jumlah kompensasi Direksi Perusahaan untuk                                           Total compensation of the Company’s Board of
    tahun yang berakhir pada tanggal 30 Juni 2025 dan                                    Directors for the years ended December 31, 2024 and
    31 Desember 2024 masing-masing adalah sebesar                                        Deecmber 2023 amounted to Rp48,677 and
    Rp48.677 dan Rp377.122.                                                              Rp377,122 respectively.

    Seluruh kompensasi kepada Dewan Komisaris dan                                        All the compensation to the Company’s Boards of
    Direksi Perusahaan merupakan imbalan kerja                                           Commissioners and Directors represents short-term
    jangka pendek.                                                                       employee benefits.

    Informasi mengenai kontribusi yang dilakukan Grup                                    Information about the contributions made by the
    ke DP-PLN diungkapkan di Catatan 49.                                                 Group to DP-PLN is disclosed in Note 49.
Page 161
                        PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                     DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                Lampiran 5/151 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                 NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                        FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                                   JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                               (Expressed in millions of Rupiah, unless otherwise stated)

52. ASET DAN LIABILITAS MONETER DALAM                                                52. MONETARY    ASSETS    AND   LIABILITIES
    MATA UANG ASING                                                                      DENOMINATED IN FOREIGN CURRENCIES

    Pada tanggal 30 Juni 2025 dan 31 Desember 2024,                                           As at June 30, 2025 and December 31, 2024, the
    Grup mempunyai aset dan liabilitas moneter dalam                                          Group had monetary assets and liabilities in foreign
    mata uang asing sebagai berikut:                                                          currencies as follows:
                                                                               30 Juni/June 30, 2025
                                                                                                                             Lain-lain/
                                                     JPY*)                    USD                      EUR*)                 Others**)
     Aset moneter                                                                                                                                            Monetary assets
     Kas dan setara kas                             3,979,636,255            339,456,144                4,765,401              11,492,990          Cash and cash equivalents
     Piutang pihak berelasi                                                   70,130,116                                                      Receivables from related parties
     Rekening bank dan deposito berjangka                                                                                                            Restricted cash in banks
         dibatasi penggunaannya                    21,877,550,121              64,448,072                                                              and time deposits
     Investasi jangka pendek                                                       7,500                                                               Short term investment
     Jumlah aset moneter                           25,857,186,376            474,034,332                4,765,401              11,492,990              Total monetary assets

     Liabilitas moneter                                                                                                                                    Monetary liabilities
     Penerusan pinjaman                           128,161,088,095            694,508,053                7,071,712                      -                        Two-step loans
     Utang sewa pembiayaan                         10,489,769,502             22,218,152                                                                        Lease liabilities
     Utang bank                                   179,171,790,871          2,809,390,456            1,237,221,677                                                   Bank loans
     Utang obligasi dan sukuk ijarah                1,000,000,000         10,188,312,000            1,000,000,000                               Bonds payable and sukuk ijara
     Utang listrik swasta                                                    311,647,089                                                          Electricity purchase payable
     Utang lain-lain                                1,997,944,861             60,730,288               37,017,848                                               Other payables
     Utang biaya proyek                             2,932,380,716             21,368,958                1,485,320                                          Project cost payable
     Utang usaha                                              -            1,575,162,440                3,513,973              59,782,712                       Trade payables
     Biaya yang masih harus dibayar                 2,819,442,798            150,570,720               22,024,551                                            Accrued expenses
     Jumlah liabilitas moneter                    326,572,416,842         15,833,908,154            2,308,335,082              59,782,712             Total monetary liabilities

     Liabilitas moneter bersih                   (300,715,230,466)        (15,359,873,822)         (2,303,569,681)            (48,289,722)              Net monetary labilities
     Ekuivalen Rupiah                                 (33,091,892)          (254,451,670)              (41,076,460)              (799,968)                   Rupiah equivalent
     Jumlah dalam Rupiah - bersih                    (329,419,990)                                                                                       Total in Rupiah - net

    *)     Dalam jumlah penuh                                                                  *) In full amount
    **)    Aset dan liabilitas dalam mata uang asing lainnya disajikan setara USD              **) Assets and liabilities denominated in other foreign currencies are presented
           dengan menggunakan kurs tanggal pelaporan                                               as USD equivalent using the exchange rate prevailing at the reporting date



                                                                         31 Desember/December 31, 2024
                                                                                                                          Lain-lain/
                                                        JPY*)                 USD*)                  EUR*)                Others**)

    Aset moneter                                                                                                                                         Monetary assets
    Kas dan setara kas                                 3,059,017,290            662,560,515             41,242,909               1,642,458     Cash and cash equivalents
    Piutang pihak berelasi                                         -             68,400,609                      -                       - Receivables from related parties
    Rekening bank dibatasi penggunaannya              22,523,144,616             62,744,309                      -                       -        Restricted cash in banks
    Investasi jangka pendek                                        -                836,191                      -                       -         Short-term investments

    Jumlah aset moneter*)                             25,582,161,906            794,541,624             41,242,909               1,642,458            Total monetary assets*)

    Liabilitas moneter                                                                                                                                    Monetary liabilities
    Penerusan pinjaman                               133,177,040,109           752,844,441               7,828,598                      -                      Two-step loans
    Utang sewa pembiayaan                             11,175,181,496            25,813,155                       -                      -                      Lease liabilities
    Utang bank                                       195,781,121,181         3,125,990,713           1,297,331,124                      -                          Bank loans
    Utang obligasi dan sukuk ijarah                    1,000,000,000        10,188,312,000           1,000,000,000                      -      Bonds payable and sukuk ijara
    Utang listrik swasta                                           -           330,409,956                       -                      -       Electricity purchase payables
    Utang lain-lain                                    1,996,565,045            49,893,528              42,197,077                      -                      Other payables
    Utang biaya proyek                                 3,587,565,217            21,999,332               1,498,341                      -                Project cost payables
    Utang usaha                                                    -         1,607,318,970                       -             16,252,219                      Trade payables
    Biaya masih harus dibayar                          5,619,522,435           151,766,337              11,085,006                      -                   Accrued expenses

    Jumlah liabilitas moneter*)                      352,336,995,483        16,254,348,432           2,359,940,146             16,252,219           Total monetary liabilities*)

    Liabilitas moneter bersih*)                     (326,754,833,577)       (15,459,806,808)        (2,318,697,237)            (14,609,761)           Net monetary liabilities*)

                                                                                                                                                                   Equivalent
    Ekuivalen dalam jutaan Rupiah                         (33,795,599)         (249,784,099)           (39,006,748)               (236,050)            in millions of Rupiah

                                                                                                                                                                    Net total -
    Jumlah bersih - dalam jutaan Rupiah                  (322,822,496)                                                                                 in millions of Rupiah

    *)     Dalam jumlah penuh                                                                   *) In full amount
    **)    Aset dan liabilitas dalam mata uang asing lainnya disajikan setara USD               **) Assets and liabilities denominated in other foreign currencies are
           dengan menggunakan kurs tanggal pelaporan                                                presented as USD equivalent using the exchange rate prevailing at the
                                                                                                    reporting date
Page 162
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                             Lampiran 5/152 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                     NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                            FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                       JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)   (Expressed in millions of Rupiah, unless otherwise stated)

52. ASET DAN LIABILITAS MONETER DALAM                        52. MONETARY    ASSETS AND  LIABILITIES
    MATA UANG ASING (lanjutan)                                   DENOMINATED IN FOREIGN CURRENCIES
                                                                 (continued)

    Apabila aset dan liabilitas dalam mata uang asing           If assets and liabilities in foreign currencies as at
    pada tanggal 30 Juni 2025 dijabarkan dengan                 June 30, 2025 had been translated using the closing
    menggunakan kurs penutupan mata uang asing                  rates at issuance of July 25, 2025, the total net
    pada tanggal 25 Juli 2025, maka liabilitas bersih           foreign currency liabilities of the Group would have
    dalam mata uang asing Grup akan mengalami                   been decreased by Rp322,894 (December 2024:
    penurunan sebesar Rp322.894 (Desember 2024:                 increased by Rp9,213,755 at issuance of May 23,
    kenaikan sebesar Rp9.213.755 pada tanggal 23 Mei            2025).
    2025).


53. SEGMEN OPERASI                                          53. OPERATING SEGMENTS

    Informasi wilayah geografis                                Geographical information

    Segmen operasi disusun sesuai dengan kebijakan             The operating segment information is prepared using
    akuntansi yang dianut dalam penyusunan dan                 the accounting policies adopted for preparing and
    penyajian laporan keuangan konsolidasian.                  presenting the consolidated financial statements.

    Manajemen telah menentukan segmen operasi                  Management has determined the operating segments
    berdasarkan laporan yang ditelaah oleh Direksi,            based on reports reviewed by the Board of Directors,
    yang telah diidentifikasikan sebagai pengambil             which has been identified as the Group’s chief
    keputusan operasional utama Grup dalam                     operating decision maker and which makes strategic
    mengambil      keputusan       strategis.   Direksi        decisions. The Board of Directors considers the
    mempertimbangkan operasi bisnis dari perspektif            business operations from the geographical operations
    operasi geografis yang terdiri dari Sumatera, Jawa         consisting of Sumatera, Java Bali and Nusa
    Bali dan Nusa Tenggara, Kalimantan, Sulawesi, dan          Tenggara, Kalimantan, Sulawesi, and Maluku and
    Maluku dan Papua.                                          Papua.

    Untuk tujuan pelaporan manajemen, pada tanggal             For management reporting purposes, as at June 30,
    30 Juni 2025 dan 31 Desember 2024 dan untuk                2025 and December 31, 2024 and for the years ended
    tahun yang berakhir pada 30 Juni 2025 dan 31               June 30, 2025 and December 31, 2024, the Group is
    Desember 2024 Grup dibagi dalam operasi                    divided into the geographical areas of Sumatera, Java
    geografis Sumatera, Jawa Bali dan Nusa Tenggara,           Bali and Nusa Tenggara, Kalimantan, Sulawesi, and
    Kalimantan, Sulawesi, dan Maluku dan Papua.                Maluku and Papua. These geographical operations
    Operasi geografis tersebut menjadi dasar pelaporan         are the basis on which the Group reports segment
    informasi segmen Grup, rinciannya adalah sebagai           information, with the following details:
    berikut:
Page 163
                            PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                         DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                       Lampiran 5/153 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                                 NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                                        FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                                                   JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                               (Expressed in millions of Rupiah, unless otherwise stated)

53. SEGMEN OPERASI (lanjutan)                                                                       53. OPERATING SEGMENTS (continued)

    Informasi wilayah geografis (lanjutan)                                                                  Geographical information (continued)

                                                                                                    `
                                                                                               30 Juni/June 30, 2025

                                                               Jawa Bali &                                                                 Maluku &                Jumlah/
                                           Sumatera                                    Kalimantan              Sulawesi
                                                              Nusa Tenggara                                                                 Papua                   Total
                                              Rp                   Rp                     Rp                        Rp                       Rp                      Rp
     Pendapatan usaha                                                                                                                                                                                      Revenue
     Pendapatan eksternal                     51,437,912           597,171,296             18,662,936              17,361,756                     4,764,074            689,397,973                  External revenue
     Pendapatan antar segmen                 (30,405,128)         (352,990,028)           (11,031,726)            (10,262,594)                   (2,816,061)          (407,505,537)           Inter-segment revenue
     Jumlah                                   21,032,783           244,181,268              7,631,210               7,099,162                     1,948,013            281,892,436                     Total revenue


     Hasil segmen                                                                                                                                                                                   Segment results
     Beban usaha                              18,036,357          190,637,047            7,344,570.88            7,328,755.31               2,970,073.68                226,316,805             Operating expenses
     Beban penyusutan                          3,087,173           19,353,188            1,080,835.79              955,543.88                 533,548.42                 25,010,289          Depreciation expenses
     Laba (Rugi) usaha                         2,996,426           53,544,221                 286,639                (229,594)                (1,022,060)                30,565,343            Operating profit/(loss)
     Penghasilan (beban) lain-lain tidak                                                                                                                                                                 Unallocated
       dapat dialokasikan                     (2,110,247)           (5,868,319)             (723,242)                   (902,479)                  (258,672)             (9,862,959)             (expenses)/revenue
     Bagian atas laba bersih entitas                                                                                                                                                          Share in net income of
       asosiasi dan ventura bersama              162,366             1,879,317                (9,942)                        -                                            2,031,741    associates and joint ventures
     Penghasilan keuangan                         25,705               376,651                   274                           0                        -                   402,630                   Finance income
     Beban keuangan                           (1,344,871)           (9,217,190)             (325,623)                   (350,742)                  (146,056)            (11,384,481)                    Finance costs
     Penurunan nilai aset tetap                      -                     -                     -                           -                          -                         -       Provision for impairment of
                                                                                                                                                                                       property plant and equipment
     Cadangan atas ketidakpastian dalam                                                                                                                                                    Allowance for uncertainty
       perlakuan pajak                                                    -                                                                                                       -                over tax treatment
     Beban pajak                                 599,546           (5,697,827)               (16,907)                      -                            -                (5,115,188)             Income tax expense
     Laba (Rugi) bersih                        1,485,725           41,978,075               (453,510)               (1,132,073)                  (1,280,732)              6,637,085          Profit/(loss) for the year

     Aktiva segmen                                                                                                                                                                                 Segment assets
     Aset                                    164,579,199         1,490,039,055            57,997,034                55,258,425                28,765,827           1,796,639,539                                Asset
     Jumlah aktiva konsolidasi               164,579,199         1,490,039,055            57,997,034                55,258,425                28,765,827           1,796,639,539           Total consolidation assets

     Kewajiban segmen                                                                                                                                                                            Segment liabilities
     Liabilitas dialokasikan                  23,073,514          687,895,282              8,359,080                   7,326,106                  7,604,001             734,257,983
     Jumlah kewajiban konsolidasi             23,073,514          687,895,282              8,359,080                   7,326,106                  7,604,001             734,257,983     Total consolidation liabilities




                                                                                  31 Desember/December 31, 2024
                                                             Jawa Bali &                                                         Maluku &               Jumlah/
                                           Sumatera         Nusa Tenggara          Kalimantan            Sulawesi                 Papua                  Total

    Pendapatan usaha                                                                                                                                                                                     Revenue
    Pendapatan eksternal                   102,028,620       1,091,447,933           37,564,631            33,496,408               14,839,772        1,279,377,364                               External revenue
    Pendapatan antar segmen                (44,475,745)       (654,001,096)         (17,383,830)          (13,920,495)              (4,215,205)        (733,996,371)                        Inter-segment revenue

    Jumlah pendapatan usaha                 57,552,875        437,446,837            20,180,801           19,575,913                10,624,567          545,380,993                                   Total revenue

    Hasil segmen                                                                                                                                                                                Segment results
    Beban usaha                            (47,114,758)       (345,108,280)         (16,870,805)          (16,610,962)              (8,560,169)         (434,264,974)                         Operating expenses
    Beban penyusutan                        (6,084,470)        (39,646,956)          (1,906,119)           (1,782,925)              (1,074,543)          (50,495,013)                        Depreciation expense
    Laba/(rugi) usaha                        4,353,647          52,691,601            1,403,877             1,182,026                  989,855            60,621,006                         Operating profit/(loss)
    (Beban)/penghasilan lain-lain
      tidak dapat dialokasikan                (944,772)         (4,934,473)             (31,042)             274,778                  235,002             (5,400,507)           Unallocated (expenses)/revenue
    Bagian atas laba bersih entitas                                                                                                                                                       Share in net income of
      asosiasi dan ventura bersama             359,623           3,069,283              (52,088)                   3                         -             3,376,821             associates and joint ventures
    Penghasilan keuangan                        91,691             883,593                  985                    -                         -               976,269                            Finance income
    Beban keuangan                          (3,212,285)        (19,154,587)            (891,224)            (698,987)                 (460,777)          (24,417,860)                             Finance costs
    Cadangan atas ketidakpastian dalam                                                                                                                                                 Allowance for uncertainty
      perlakuan pajak                                -          (6,885,770)                   -                        -                     -            (6,885,770)                       over tax treatment
    Beban pajak                               (348,400)        (10,095,135)             (63,400)                       -                     -           (10,506,935)                       Income tax expense

    Laba/(rugi) bersih                        299,504          15,574,512               367,108              757,820                  764,080            17,763,024                      Profit/(loss) for the year

    Aset segmen                                                                                                                                                                                  Segment assets
    Jumlah aset konsolidasian              224,743,887       1,359,020,011           77,296,033           72,699,296                38,616,039        1,772,375,266                      Total consolidated assets

    Liabilitas segmen                                                                                                                                                                         Segment Liabilities
    Jumlah liabilitas konsolidasian        219,688,276        283,256,532            83,533,068           77,021,137                47,716,018          711,215,031                    Total consolidated liabilities
Page 164
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                     Lampiran 5/154 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                    NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                           FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                      JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                  (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN              PENTING,          IKATAN           DAN       54. SIGNIFICANT AGREEMENTS,                COMMITMENTS
    KONTINJENSI                                                              AND CONTINGENCIES

    Pada tanggal 30 Juni 2025, Grup memiliki perjanjian                         As at June 30, 2025, the Group has significant
    penting sebagai berikut:                                                    agreements, as follows:

    a.    Perjanjian pengadaan bahan bakar                                      a.   Fuel supply agreements

          Gas                                                                        Gas

                      Sektor/                                 Pemasok/                      Periode/      Satuan/         Kuantitas/
                      Sector                                  Supplier                       Period         Unit          Quantity *)
          Perusahaan
          Kotogasib, Rengat dan Siberida       PHE Jambi Merang                            2019 - 2026    BBTUD                          5
          PLTGU Riau                           EMP Bentu                                   2021 - 2026    BBTUD                         40
                                               Medco EP Grissik                            2015 - 2028    BBTUD                         20
          Sutami dan Tarahan                   PGN (FSRU Lampung)                          2024 - 2029    BBTUD          s.d 250/up to 250
                                               Pertamina                                   2023 - 2025    Kargo/                 Lampiran
                                               ENI East Sepinggan Ltd.                                     Cargo               konfirmasi/
                                               ENI Energy East Sepinggan B.V.                                                 Confirmation
                                               Pertamina Hulu Energy East                                                           Notice
                                               Sepinggan
                                               PGN                                         2019 - 2030    BBTUD                        5-6
                                               Pertamina (LNG)                             2018 - 2026    Kargo/                 Lampiran
                                                                                                           Cargo               konfirmasi/
                                                                                                                              Confirmation
                                                                                                                                    Notice
          Luwuk                                E&P Tomori                                  2021 - 2027    BBTUD                          5
          Melibur                              PT Imbang Tata Alam                         2020 - 2025     BBTU                       711
          Jawa Satu Power, Sutami, dan         BP Berau (LNG)                              2014 - 2035    Kargo/                  Program
          Tarahan                                                                                          Cargo               pengiriman
                                                                                                                          tahunan/Annual
                                                                                                                         Delivery Program
                                                                                                                                    (ADP)
          Nunukan                              Pertamina EP                                2019 - 2025    BBTUD                          2

          PIP
          Priok                                Nusantara Regas                             2024 - 2026     Kargo/       Sesuai kebutuhan/
                                                                                                           Cargo             Depends on
                                                                                                                                 necessity
          Cilegon                              PLN EPI - PHE OSES                          2024 - 2029    BBTUD                          5
                                               Pertamina (Gas JTB)                         2021 - 2035    BBTUD                        100
          Grati                                Medco Energy Sampang Pty Ltd.               2004 - 2027                     Notifikasi JHK/
                                               Singapore Petroleum Sampang Ltd.                           BBTUD           JHK Notification
                                               Cue Sampang Pty. Ltd. (Gas                                                      (TOP 95%)
                                               Sampang)
                                               Kangean Energy Indonesia Ltd                2012 - 2028    BBTUD                      20-50
                                                                                                                               (TOP 90%)
                                               PT Pertamina Gas                            2014 - 2033   MMSCFD              s.d/up to 100
                                                                                                                             (Take or Pay
                                                                                                                               (“TOP”) 80)
          Keramasan                            PT Medco E&P Lematang dan PT                2017 - 2027    BBTUD             20 (TOP 90%)
                                               Medco E&P Indonesia
                                               PT Pertamina Gas (Pertagas Medco)           2020 - 2027   MMSCFD             Minimum DRC
                                                                                                                           Indralaya 2020-
                                                                                                                                  2027 :6.6
          Mahakam                              Pertamina (Persero)                         2022 - 2026    BBTUD                  2022: 8
                                                                                                                           2023:s.d/up to
                                                                                                                                     11.7
                                                                                                                           2024:s.d/up to
                                                                                                                                     18.3
                                                                                                                             2025:15.50
                                                                                                                             2026: 36.30
                                                                                                                        (TOP 75% ACQ)
                                               PT Pertamina Gas (Pertagas)                 2018 - 2028   MMSCFD           2020-2028 DRC:
                                                                                                                                      5.333
                                               Pertamina EP Tanjung Batu                   2023 - 2027   MMSCFD                           5

         *) Dalam jumlah penuh/In full amount
         **) Sedang dalam proses perpanjangan kontrak/On process of contract extension
Page 165
                      PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                   DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                     Lampiran 5/155 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                  NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                         FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                    JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN     PENTING,                   IKATAN            DAN    54. SIGNIFICANT AGREEMENTS, COMMITMENTS
    KONTINJENSI (lanjutan)                                                 AND CONTINGENCIES (continued)

    Pada tanggal 30 Juni 2025, Grup memiliki perikatan                         As at June 30, 2025, the Group has significant
    penting dan kontinjensi sebagai berikut: (lanjutan)                        commitments and contingencies, as follows:
                                                                               (continued)

    a.    Perjanjian pengadaan bahan bakar (lanjutan)                          a.   Fuel supply agreements (continued)

          Gas (lanjutan)                                                            Gas (continued)
                       Sektor/                             Pemasok/                        Periode/      Satuan/       Kuantitas/
                        Sector                              Supplier                        Period        Unit         Quantity *)
          PIP (lanjutan/continued)
          Jambi                                Energasindo Heksa Karya                    2023 - 2028    BBTUD                       9
          Semarang                             PT Sumber Petrindo Perkasa                 2014 - 2029    BBTUD              40 - 54.5
                                               Pertamina Gas Negara JTB                   2022 - 2035    BBTUD               90 - 100
          Sorong                               PT Malamoi Olom Wobok                      2021 - 2025    BBTUD               7.2 - 8.8
          Priok, Cilegon, dan Bali             Pertamina (LNG)                            2018 - 2026    Kargo/            Lampiran
                                                                                                          Cargo           konfirmasi/
                                                                                                                        Confirmation
                                                                                                                               Notice
                                               BP Berau (LNG)                             2014 - 2035    Kargo/             Program
                                                                                                         Cargo            pengiriman
                                                                                                                            tahunan/
                                                                                                                      Annual Delivery
                                                                                                                      Program (ADP)
                                               Pertamina                                  2023 - 2025     Kargo/           Lampiran
                                               ENI East Sepinggan Ltd.                                    Cargo           konfirmasi/
                                               Neptune Energy East Sepinggan B.V.                                       Confirmation
                                               Pertamina Hulu Energy East                                                      Notice
                                               Sepinggan
          Priok dan Cilegon                    PGN                                        2019 - 2030    BBTUD            Interruptible
                                               PGN (FSRU Lampung)                         2024 - 2029    BBTUD           s.d/up to 250

          PNP
          Gresik                               Pertamina Hulu Energi WMO                  2023 - 2027    BBTUD                        15
                                               PT Saka Energi Indonesia                   2011 - 2026    BBTUD                    24.33
                                               Kangean Energy Indonesia Ltd.              2008 - 2028    BBTUD                        30
                                               Petrogas Jatim Utama                       2016 - 2025     TBTU                       7.3
                                               PLN EPI - HCML                             2024 - 2027    BBTUD                        30
                                               PT Pertamina Gas                           2014 - 2033   MMSCFD           s.d./up to 100
                                                                                                                          (Take or Pay
                                                                                                                            "TOP") 80)
                                               Pertamina Gas Negara JTB                   2022 - 2035    BBTUD                 90 - 100
          Muara Karang                         Pertamina Hulu Energi ONWJ                 2023 - 2030     TBTU                    2,562
          Muara Tawar                          PT Pertamina EP                            2024 - 2026   MMSCFD                        12

          Arun dan Belawan                     Perta Arun Gas                             2025 - 2028    BBTUD                  Sesuai
                                                                                                                           kebutuhan/
                                                                                                                          Depends on
                                                                                                                            necessity
          Belawan                              PT Pertagas                                2015 - 2029    MSCF              34,675,000
          Pekanbaru                            PHE Jambi Merang                           2022 - 2026    BBTUD                       5
                                               Transportasi Gas Indonesia                 2018 - 2028    MSCF              16,706,050
                                               PT Energi Mega Persada                     2021 - 2026    BBTUD                      40
          Kalselteng                           Medco Bangkanai                            2016 - 2033    BBTUD                      20
          Kaltimra                             Medco E&P Indonesia                        2022 - 2025    BBTUD                       3
                                               Pertamina EP                               2023 - 2027    BBTUD                     6.3
          Gorontalo                            Pertamina                                  2023 - 2025    Kargo/              Lampiran
                                               ENI East Sepinggan Ltd.                                    Cargo            konfirmasi/
                                               Neptune Energy East Sepinggan B.V.                                         Confirmation
                                               Pertamina Hulu Energy East                                                       Notice
                                               Sepinggan
                                               PLN Energi Gas                             2022 - 2035    BBTUD                     104

         *) Dalam jumlah penuh/In full amount
         **) Sedang dalam proses perpanjangan kontrak/On process of contract extension
Page 166
                     PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                  DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                           Lampiran 5/156 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                         NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                           JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                       (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN      PENTING,                      IKATAN               DAN      54. SIGNIFICANT AGREEMENTS, COMMITMENTS
    KONTINJENSI (lanjutan)                                                          AND CONTINGENCIES (continued)

    Pada tanggal 30 Juni 2025, Grup memiliki perikatan                              As at June 30, 2025, the Group has significant
    penting dan kontinjensi sebagai berikut: (lanjutan)                             commitments and contingencies, as follows:
                                                                                    (continued)

    a.    Perjanjian pengadaan bahan bakar (lanjutan)                               a.      Fuel supply agreements (continued)

          Gas (lanjutan)                                                                    Gas (continued)

                      Sektor/                                     Pemasok/                          Periode/        Satuan/           Kuantitas/
                       Sector                                      Supplier                          Period          Unit             Quantity *)
          PNP (lanjutan/continued)
          Sengkang                                   PLN EPI - EEES & EMA                         2023 - 2030       BBTU                        17,120
          Muara Karang, Muara Tawar,                 BP Berau (LNG)                               2014 - 2035       Kargo/                    Program
          Arun, Belawan, dan Gorontalo                                                                              Cargo                  pengiriman
                                                                                                                                      tahunan/ Annual
                                                                                                                                     Delivery Program
                                                                                                                                                 (ADP)
                                                     Pertamina (LNG)                              2018 - 2026       Kargo/                   Lampiran
                                                                                                                    Cargo                  konfirmasi/
                                                                                                                                          Confirmation
                                                                                                                                                Notice
          Muara Karang dan Muara Tawar               PGN                                          2019 - 2030       BBTUD                          5-6

                                                     PGN (FSRU Lampung)                           2024 - 2029       BBTUD               s.d/up to 250
                                                     Nusantara Regas                              2024 - 2026       BBTUD           Sesuai kebutuhan/
                                                                                                                                         Depends on
                                                                                                                                             necessity

          PLN Batam
          Multidestinasi                          PGN                                             2019 - 2028       BBTUD                        61.4
                                                  PGN (FSRU Lampung)                              2024 - 2029       BBTUD               s.d/up to 250
                                                  Jadestone                                       2024 - 2038       BBTUD                          21
                                                  Transportasi Gas Indonesia                      2022 - 2038       BBTUD                        20.5
                                                  Pertamina (LNG)                                 2018 - 2026       Kargo/                  Lampiran
                                                                                                                    Cargo                 konfirmasi/
                                                                                                                                         Confirmation
                                                                                                                                               Notice
                                                  BP Berau (LNG)                                  2014 - 2035       Kargo/                   Program
                                                                                                                    Cargo                 pengiriman
                                                                                                                                     tahunan/ Annual
                                                                                                                                    Delivery Program
                                                                                                                                               (ADP)

         *) Dalam jumlah penuh/In full amount
         **) Sedang dalam proses perpanjangan kontrak/On process of contract extension

          Sehubungan      dengan      perjanjian    diatas,                                In relation with the above agreements, the
          Perusahaan mempunyai fasilitas stand-by letter                                   Company has stand-by letter of credit facilities
          of credit dengan rincian sebagai berikut:                                        with the following details:

                Bank penerbit/                                  Penerima manfaat/                               Mata uang/              Jumlah/
                Issuing Bank                                       Beneficiary                                  Currency                Total *)

          BRI                        Ophir Indonesia (Sampang) Pty.                             AAAAAAAAAAAAAA USDAAAAAAAA              14,340,950
                                     PT Pertamina                                        AAAAAAA AAAAAAAAAAAAAAUSDAAAAAAAA              39,205,507
                                     PGN                                                  AAAAAAAAA AAAAAAAAAAA USDDAAAAAAAAA              20,700
                                     PT Transportasi Gas Indonesia                       AAAAAAAAAAaaaaaa AAAAAAUSDAAAAAUSDAAA        a 24,140,240
                                     Kangean Energy Indonesia                            AAAAAAAAAAAAAAUSDAAAA USDaaaAAAA               10,495,869
                                     Petrochina international Jabung Ltd.                AAAAAAAAAAAAAAUSDAAAAUSDaaAAA                   5,040,000


          Bank Mandiri               BP Berau Ltd.                                                  AAAAAAAAAAAAAA USDAAAAAAAAAAA      118,687,684

          BNI                        PT Petrogas Jatim Utama                                  AAAAAAAAAAAAAA RupiahAAAAAAAAA         103,293,225,000
                                     PT Pertamina                                         AAAAAAAAAAAAAAAAAAAAUSDAAAAAAAAAA           43,649,970


          *) dalam jumlah penuh                                                           *) in full amount
Page 167
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                        Lampiran 5/157 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                     NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                            FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                       JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                   (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN     PENTING,                     IKATAN           DAN       54. SIGNIFICANT AGREEMENTS, COMMITMENTS
    KONTINJENSI (lanjutan)                                                     AND CONTINGENCIES (continued)

    a.    Perjanjian pengadaan bahan bakar (lanjutan)                            a.   Fuel supply agreements (continued)

          Batubara                                                                    Coal

                                                                               Volume kontrak tahunan/
                                                                                Annual contract volume
                                Pemasok/Suppliers                               (dalam/in metric ton) *)                  Periode/Period
         Perusahaan
         PT Multi Harapan Utama                                                                     600,000                2021 - 2027
         PT Kaltim Prima Coal                                                                       500,000                2021 - 2027
         PT Kaltim Prima Coal                                                                       500,000                2021 - 2027
         PT Kaltim Prima Coal                                                                       800,000                2025 - 2026
         PT Bharinto Ekatama                                                                        603,000                2024 - 2025
         PT Indominco Mandiri                                                                       536,000                2024 - 2025
         PT Bukit Baiduri Energi                                                                    200,000               2023 - 2025**
         PT Kaltim Prima Coal                                                                     2,000,000                2025 - 2026
         PT Indominco Mandiri                                                                       816,000                2024 - 2025
         PT Bharinto Ekatama                                                                        680,000                2024 - 2025
         PT Mahakam Sumber Jaya                                                                     603,000                   2025
         PT Energi Sinar Bara                                                                        67,000                2024-2025
         PT Bukit Asam***                                                                        19,000,000                2012 - 2032
         Kons. PT Arutmin Indonesia dan PT Darma Henwa***                                         2,005,000                2008 - 2028
         Konsorsium PT Exploitasi Energi Indonesia dan PT Borneo                                  2,000,000                2022 - 2027
         Indobara***
         Kons. PT Dwi Guna Laksana & PT Borneo Indo Bara***                                       1,890,000                2017 - 2033
         PT Indexim Coalindo***                                                                   1,100,000                2018 - 2028
         Kons. PT Antareja Energi Asia, PT Binuang Mitra Bersama                                  2,000,000                2022 - 2027
         Blok Dua dan PT Berkat Murah Rejeki***
         PT Kaltim Prima Coal                                                                     2,800,000                2025 - 2026
         Kons. PT Arutmin Indonesia dan PT Darma Henwa***                                         5,553,000                2007 - 2027
         PT Titan Infra Energy***                                                                 2,920,000                2007 - 2033
         PT Global Energi Lestari, PT Era Perkasa Mining, dan PT                                  2,215,000                2022 - 2027
         Quasar Inti Nusantara***
         PT Rizky Anugrah Pratama, PT Kasongan Mining Mills, PT                                   1,490,000                2022 - 2027
         Hutamas Koado, PT Marga Perkasa, PT Arini, dan CV
         Hirzan***
         PLN Batubara Niaga                                                                       1,827,500                   2025
         PT Mandiri Intiperkasa                                                                   1,107,000                2024 - 2026

         PIP
         PT Bukit Asam                                                                            5,200,000                2013 - 2025
         PT Oktasan Baruna Persada                                                                2,100,000                2018 - 2026
         PT Artha Daya Coalindo                                                                   2,100,000                2017 - 2027
         PT Multi Harapan Utama                                                                   1,000,000                2022 - 2026


         PNP
         PT Bukit Asam (Tarahan)                                                                    550,000                2004 - 2031
         PT Bhumi Rantau Energi                                                                     437,500                2024 - 2026
         PT Bukit Asam (PLTU Bukit Asam)                                                            815,000                2024 - 2026
         PT Bara Tabang                                                                             800,000                2024 - 2025

         PLN Batam
         PT Kideco Jaya Agung                                                                       300,000                2007 – 2027

         *) Dalam jumlah penuh/In full amount
         **) Sedang dalam proses perpanjangan kontrak atau kontrak tahunan/On process of contract extension or annual contract
         ***) Kontrak pasokan batu bara Perusahaan termasuk pengiriman ke pembangkit yang telah ditransfer ke PNP dan PIP/The Company's coal supply
         contracts including delivery to power plants that have been transferred to PNP and PIP
Page 168
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                             Lampiran 5/158 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                     NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                            FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                       JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)   (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN     PENTING,            IKATAN       DAN     54. SIGNIFICANT AGREEMENTS, COMMITMENTS
    KONTINJENSI (lanjutan)                                      AND CONTINGENCIES (continued)

    a.   Perjanjian pengadaan bahan bakar (lanjutan)           a.   Fuel supply agreements (continued)

         Batubara (lanjutan)                                        Coal (continued)

         Pada tanggal 9 Maret 2018, Kementerian                     On March 9, 2018, the Ministry of Energy and
         ESDM menerbitkan Surat Keputusan No. 1395                  Mineral        Resources         issued       Decree
         K/30/MEM/2018      mengenai    Harga     Jual              No. 1395 K/30/MEM/2018 regarding the Coal
         Batubara Untuk Penyediaan Tenaga Listrik                   Selling Price for Electricity Supply for The Public
         Untuk Kepentingan Umum yang berlaku surut                  Interest, which was retroactively valid from
         sejak 1 Januari 2018. Sesuai surat keputusan               January 1, 2018. According to the decree, the coal
         tersebut, harga batubara ditetapkan sebesar                price was regulated at a maximum price of
         maksimal USD70/metrik ton dengan acuan                     USD70/metric ton referenced to coal at 6,322
         pada kalori 6.322 kcal/kg. Surat keputusan                 kcal/kg. The decree also regulated the formula to
         tersebut juga mengatur formula untuk                       calculate the price for different specifications of
         menghitung harga dengan spesifikasi yang                   coal as listed in the decree. On December 26,
         berbeda seperti yang tercantum dalam                       2019, the Ministry of Energy and Mineral
         keputusan tersebut. Pada tanggal 26                        Resources           issued         Decree          No.
         Desember      2019,    Kementerian    ESDM                 261K/30/MEM/2019 regarding the fulfillment of
         menerbitkan Surat Keputusan No. 261                        domestic coal needs in 2020, which was effective
         K/30/MEM/2019       mengenai     pemenuhan                 on January 1, 2020. This decree revokes the
         kebutuhan batubara dalam negeri tahun 2020                 Decree of the Minister of Energy and Mineral
         yang mulai berlaku pada tanggal 1 Januari                  Resources No. 1395K/30/MEM/2018 regarding
         2020. Surat keputusan ini mencabut Keputusan               the selling price of coal for the supply of electricity
         Menteri ESDM No. 1395 K/30/MEM/2018                        for public purposes.
         mengenai harga jual batubara untuk
         penyediaan tenaga listrik untuk kepentingan
         umum.

         Pada tanggal 2 November 2020, Menteri                      On November 2, 2020, the Minister of Law and
         Hukum dan Hak Asasi Manusia mengeluarkan                   Human Rights issued Law No. 11 year 2020 on
         Undang-Undang No. 11 Tahun 2020 tentang                    Job Creation. The main point of the law relating
         Cipta Kerja. Poin utama peraturan tersebut                 to the Group relates to the inclusion of coal
         yang berkaitan dengan Grup adalah hasil                    mining products in the types of goods subject to
         pertambangan batubara termasuk dalam jenis                 VAT, and therefore all purchases of coal are
         barang yang dikenai PPN, maka seluruh                      subject to VAT at 10%. In accordance with the
         pembelian batubara dikenakan PPN terhitung                 HPP Law which was approved on October 29,
         mulai tanggal tersebut dengan tarif 10%.                   2021, the VAT rate that will be applied as at April
         Sesuai dengan UU HPP yang telah disahkan                   1, 2022 is 11%.
         pada tanggal 29 Oktober 2021, tarif PPN yang
         akan berlaku per tanggal 1 April 2022 adalah
         sebesar 11%.

         Harga pembelian batubara pada tahun berjalan               The price of coal purchases for the current year
         setelah disesuaikan dengan nilai kalori, kadar             after being adjusted against calorific value, ash
         abu, sulfur, air, Ash Fusion Temperature                   content, sulfur, water, Ash Fusion Temperature
         (“AFT”) dan Hardgrove Grindability Index                   (“AFT”) and Hardgrove Grindability Index (“HGI”)
         (“HGI”) berkisar antara Rp474.266 sampai                   ranges from Rp474,266 to Rp1,206,662 per ton
         dengan Rp1.206.662 per ton (Desember 2024:                 (December 2024: Rp340,718 to Rp1,680,308 per
         Rp294.841 sampai dengan Rp340.718 sampai                   ton).
         dengan Rp1.680.308 per ton).
Page 169
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                               Lampiran 5/159 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                               FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                          JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)      (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN     PENTING,             IKATAN        DAN      54. SIGNIFICANT AGREEMENTS, COMMITMENTS
    KONTINJENSI (lanjutan)                                         AND CONTINGENCIES (continued)

    a.   Perjanjian pengadaan bahan bakar (lanjutan)              a.   Fuel supply agreements (continued)

         Bahan bakar minyak                                            Fuel

         Perusahaan dan Pertamina mengadakan                           The Company and Pertamina entered into a Fuel
         Perjanjian Induk Jual Beli Bahan Bakar Minyak                 Sale and Purchase Agreement No. 066-
         No. 066-1.PJ/040/DIR/2007 tanggal 16 Mei                      1.PJ/040/DIR/2007 dated May 16, 2007. This
         2007. Perjanjian ini telah diamandemen tanggal                agreement was amended on August 14, 2009,
         14 Agustus 2009 dimana Perusahaan dan                         whereby, the Company and Pertamina agreed
         Pertamina menyepakati antara lain: (i)                        among other things: (i) that the monthly fuel price
         penggunaan harga bahan bakar bulanan                          to be used for the period January 1 until April 30,
         ditetapkan oleh Pertamina untuk periode 1                     2007 is determined by Pertamina and the fuel
         Januari sampai dengan 30 April 2007 dan                       price of 109.5% from Mean Oil Platts Singapore
         harga bahan bakar 109,5% dari Mean Oil Platts                 (“MOPS”) plus VAT for the period May 1, 2007
         Singapore        (“MOPS”)       ditambah     Pajak            until December 31, 2007; (ii) that the fuel price
         Pertambahan Nilai untuk periode 1 Mei 2007                    subsequent to December 31, 2007 will be
         sampai dengan 31 Desember 2007; (ii) harga                    determined by both parties every year; (iii) that
         bahan bakar setelah tanggal 31 Desember                       the terms of payment and penalty charges on late
         2007 akan ditetapkan oleh kedua belah pihak                   payment use a monthly rate of Certificate of Bank
         setiap tahun; (iii) jangka waktu pembayaran                   Indonesia plus 1.3%; (iv) that effective on May 1,
         berikut pengenaan denda keterlambatan                         2007, the unpaid balance of payable for the
         pembayaran sebesar tingkat bunga Sertifikat                   purchases of fuel until April 30, 2007 will bear
         Bank Indonesia bulanan ditambah 1,3%; (iv)                    interest with a rate per annum of Certificate of
         efektif mulai 1 Mei 2007, saldo utang yang                    Bank Indonesia plus 1.3%, until settled by
         belum dibayar atas pembelian bahan bakar                      issuance of PLN bonds, which is no later than
         sampai dengan 30 April 2007 dikenakan bunga                   August 31, 2007; (v) that the maximum payables
         sebesar tingkat bunga Sertifikat Bank                         to Pertamina, including bonds which will be
         Indonesia per tahun ditambah 1,3%, sampai                     issued amounting to Rp18 trillion; and (vi) that this
         diselesaikan dengan menerbitkan obligasi PLN                  agreement is valid for five years from January 1,
         selambat-lambatnya tanggal 31 Agustus 2007;                   2007 until December 31, 2011.
         (v) utang kepada Pertamina, termasuk obligasi
         yang akan diterbitkan maksimum sebesar Rp18
         triliun; dan (vi) perjanjian ini berlaku untuk lima
         tahun sejak 1 Januari 2007 sampai dengan 31
         Desember 2011.

         Berdasarkan Surat Kesepakatan Bersama                         Based on the Joint Deal Letter dated May 16,
         tanggal 16 Mei 2007, PT Sucofindo (Persero)                   2007, PT Sucofindo (Persero) is assigned as an
         ditunjuk sebagai surveyor independen untuk                    independent surveyor to perform supervision on
         melakukan pengawasan terhadap pengukuran                      the delivery measurement and quality inspection
         serah terima serta pemeriksaan kualitas bahan                 of fuel oil purchased by PLN from Pertamina.
         bakar minyak yang dibeli oleh PLN dari
         Pertamina.

         Berdasarkan Addendum IV Perjanjian Jual Beli                  Based on Amendment IV of the Fuel Sale and
         Bahan Bakar Minyak tanggal 8 Maret 2017,                      Purchase Agreement dated March 8, 2017, PLN
         PLN dan Pertamina menyepakati perpanjangan                    and Pertamina agreed to extend the period of
         jangka waktu pasokan hingga tahun 2020.                       supply until 2020.

         Berdasarkan Addendum VIII tertanggal 8                        Based on Addendum VIII dated February 8,
         Februari 2022, kesepakatan harga jual beli                    2022, the agreement on the sale and purchase
         bahan bakar minyak (HSD dan MFO) sejak                        price of fuel oil (HSD and MFO) from January 1,
         tanggal 1 Januari 2021 sampai dengan 31                       2021 to December 31, 2023 between Pertamina
         Desember 2023 antara Pertamina dan                            and the Company is as follows:
         Perusahaan adalah sebagai berikut:
Page 170
                      PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                   DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                   Lampiran 5/160 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                             NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                    FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                               JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                           (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN     PENTING,                                IKATAN          DAN     54. SIGNIFICANT AGREEMENTS, COMMITMENTS
    KONTINJENSI (lanjutan)                                                             AND CONTINGENCIES (continued)

    a.   Perjanjian pengadaan bahan bakar (lanjutan)                                    a.   Fuel supply agreements (continued)

         Bahan bakar minyak (lanjutan)                                                       Fuel (continued)

         a. Selama masa negosiasi, formula harga baru                                        a. During the negotiation period, the new price
            untuk periode tanggal 1 Januari 2021                                                formula for the period of January 1, 2021 to
            sampai dengan 31 Desember 2021,                                                     December 31, 2021, uses the provisional
            menggunakan formula harga sementara                                                 price formula agreed in the amendment for
            yang telah disepakati pada addendum untuk                                           the period of January 1, 2018 to December
            periode 1 Januari 2018 sampai dengan 31                                             31, 2020.
            Desember 2020.
         b. Sehubungan dengan hal tersebut, formula                                          b. Based on the above situation, a new price
            harga baru akan disepakati untuk periode                                            formula will be agreed for the period starting
            terhitung mulai tanggal 1 Januari 2022                                              from January 1, 2022 to December 31, 2023.
            sampai dengan 31 Desember 2023.

         Perjanjian jual beli bahan bakar minyak dengan                                      The fuel purchase agreement with Pertamina
         Pertamina telah berakhir pada 31 Desember                                           ended on December 31, 2023. To fulfill the
         2023.               Untuk            memenuhi                                       Company’s fuel needs, the Company has signed
         kebutuhan bahan bakar minyak, Perusahaan                                            a new fuel purchase agreement with Pertamina
         telah    menandatangani       perjanjian   jual                                     Patra    Niaga     starting   January      1,
         beli bahan bakar minyak baru dengan                                                 2024.
         Pertamina Patra Niaga mulai 1 Januari 2024.

         Pada 12 Agustus 2024, Perusahaan telah                                              On August 12, 2024, the Company renewed the
         memperbaharui perjanjian jual beli bahan bakar                                      Fuel Sale and Purchase Agreement with
         minyak No. 0026.PJ/EPI.01.03/PLNEPI0100/2024                                        Pertamina          Patra       Niaga        No.
         dengan Pertamina Patra Niaga untuk periode 1                                        0026.PJ/EPI.01.03/PLNEPI0100/2024 for period
         Juli 2024 sampai dengan 30 September 2024.                                          July 1st, 2024 until September 30, 2024.
         Atas perjanjian ini sedang dilakukan                                                Amendments are being made to this agreement
         amandemen untuk perpanjangan atas Kontrak                                           to extend the Long-Term Fuel Sales and
         Jangka Panjang Perjanjian Jual Beli Bahan                                           Purchase Agreement. As the basis for
         Bakar Minyak. Sebagai dasar pembelian bahan                                         purchasing fuel from 1 October 2024 to 31 March,
         bakar minyak dari 1 Oktober 2024 hingga 30                                          2025, the Company has signed Heads of
         Juni 2025, Perusahaan telah menandatangani                                          Agreement                                   No.
         Kesepakatan              Awal              No.                                      0054.Pj/EPI.01.02/PLNEPI0100/2024           and
         0054.Pj/EPI.01.02/PLNEPI0100/2024         dan                                       0011.Pj/EPI.01.03/PLNEPI0100/2025.
         0011.Pj/EPI.01.03/PLNEPI0100/2025.

         Uap panas bumi                                                                      Geothermal steam

         Pada tanggal 30 Juni 2025 dan 31 Desember                                           As at June 30, 2025 and December 31, 2024, the
         2024, Grup memiliki perjanjian dengan                                               Group entered into geothermal steam purchase
         beberapa pemasok untuk pengadaan uap                                                agreements with several suppliers as follows:
         panas bumi sebagai berikut:
                                                                                                                                Periode/
                       Sektor/Sector                                              Pemasok/Supplier                               Period

         Kamojang Unit 1, 2 & 3                                  PGE                                                           2012 - 2040
         Lahendong Unit 1                                        PGE                                                           2002 - 2032
         Lahendong Unit 2 & 3                                    PGE                                                           2007 - 2039
         Lahendong Unit 4                                        PGE                                                           2011 - 2041
         Ulubelu Unit 1 & 2                                      PGE                                                           2012 - 2042
         Hululais Unit 1 & 2                                     PGE                                                         30 tahun/years*)
         Sungai Penuh Unit 1 & 2                                 PGE                                                         30 tahun/years*)
         Kotamobagu Unit 1,2,3 & 4                               PGE                                                         30 tahun/years*)
         Darajat Unit 1                                          PGE, Star Energy Geothermal Darajat I                         1994 - 2030
                                                                   Ltd., Star Energy, Geothermal Darajat II Ltd.
         Gunung Salak Unit 1,2 & 3                               PGE, Star Energy Geothermal Salak Ltd.,
                                                                   Ltd., Star Energy Geothermal Salak Pratama Ltd.             1993 - 2040
         *) Sejak tanggal komersialisasi/Since Commercial Date
Page 171
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                         Lampiran 5/161 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                 NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                        FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                   JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)               (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN     PENTING,                    IKATAN         DAN      54. SIGNIFICANT AGREEMENTS, COMMITMENTS
    KONTINJENSI (lanjutan)                                                 AND CONTINGENCIES (continued)

    b.   Perjanjian jual beli tenaga listrik dan kontrak                     b.    Power purchase agreements and energy
         penjualan energi                                                          sales contracts

         Sebelum         tahun     1997,      Perusahaan                           Prior to 1997, the Company entered into PPAs
         mengadakan PPA dan ESC dengan IPP skala                                   and ESCs with large-scale IPPs. In 1999, the
         besar. Pada tahun 1999, Perusahaan telah                                  Company entered into renegotiation of the PPAs
         melaksanakan renegosiasi terhadap PPA dan                                 and ESCs through a Working Group on PT PLN
         ESC melalui Kelompok Kerja Renegosiasi                                    (Persero) Special Contract Renegotiation under
         Kontrak Khusus PT PLN (Persero) di bawah                                  the direction of the Government. Such
         arahan Pemerintah. Renegosiasi tersebut                                   renegotiation includes, among other subjects,
         meliputi antara lain keseimbangan kondisi                                 equalisation     in     contract    conditions,
         kontrak, kewajaran harga dan disparitas harga                             reasonableness of price and disparity of selling
         jual listrik IPP dan harga jual Perusahaan.                               price between the IPPs and the Company.

         Dalam perjanjian dengan IPP tertentu,                                     Based on the agreements with certain IPPs, the
         disepakati bahwa setiap saat selama perjanjian                            Group may exercise its option to purchase all of
         berlaku, Grup dapat melaksanakan opsi untuk                               the IPP’s rights, title and interest in the projects at
         membeli hak penjual, milik, dan kepentingan                               any time during the contract period.
         atas proyek yang bersangkutan.

         Pada tanggal 30 Juni 2025, perjanjian                                     As at June 30, 2025, the significant agreements
         signifikan antara Grup dengan IPP adalah                                  between the Group with IPPs are as follows:
         sebagai berikut:

         Sudah beroperasi                                                          In operation

                                                                                                                            Tanggal Operasi
                                                                                     Kapasitas/                                komersial/
                                                                    Bahan Bakar/      Capacity                 Periode/       Commercial
          Perusahaan/Company              Proyek/Project                Fuel           (MW)       AF (%)        Period       Operation Date

         Perusahaan

         PT Bajradaya Sentranusa   PLTA Asahan I                     Tenaga Air/        180        1,175      2011 - 2041    18 Januari 2011/
                                                                       Hydro                       GWh/                      January 18, 2011
                                                                                                    year
         PT Malea Energy           PLTA Malea                        Tenaga Air/         90         474       2021 - 2051      2 Juli 2021/
                                                                       Hydro                       GWh/                        July 2, 2021
                                                                                                    year
         PT Poso Energy            PLTA Poso                         Tenaga Air/        515        1,669      2023 - 2053    7 Februari 2023/
                                                                       Hydro                       GWh/                      February 7, 2023
                                                                                                    year
         PT Tanggamus Electric     PLTA Semangka                     Tenaga Air/         56        278.7      2018 - 2048      2 Juli 2018/
         Power                                                         Hydro                       GWh/                        July 2, 2018
                                                                                                    year
         PT UPC Sidrap Bayu        PLTB Sidrap                       Angin/Wind          70       Variabel/   2018 - 2048       5 April 2018/
         Energi                                                                                   Variable                      April 5, 2018
         PT Energi Bayu            PLTB Tolo                         Angin/Wind          60       Variabel/   2019 - 2049       14 Mei 2019/
         Jeneponto                                                                                Variable                      May 14, 2019
         PT Bekasi Power           PLTGU Bekasi Power                Gas Pipa/          119         90%       2013 - 2033     5 Januari 2013/
                                                                     Gas Pipe                                                 January 5, 2013
         PT Cikarang Listrindo     PLTGU Cikarang Ekspansi (150      Gas Pipa/          150         72%       2011 - 2031       1 Juni 2011/
                                   MW)                               Gas Pipe                                                   June 1, 2011
         PT Metaepsi Pejebe        PLTGU Gunung Megang (2x40         Gas Pipa/          110         85%       2013 - 2028        8 Juli 2013/
         Power Generation          MW + 1 x30 MW)                    Gas Pipe                                                    July 8,2013
         PT Jawa Satu Power        PLTGU Jawa-1 Unit 1 & 2           Gas Pipa/         1760         60%       2024 - 2049      29 Maret 2024/
                                                                     Gas Pipe                                                 March 29, 2024
         PT Asrigita Prasarana     PLTGU Palembang Timur (150        Gas Pipa/          150         85%       2005 - 2025   16 Desember 2005/
                                   MW)                               Gas Pipe                                               December 16, 2005
         PT Medco Ratch Power      PLTGU Riau (275 MW)               Gas Pipa/          275         60%       2022 - 2042    10 Februari 2022/
         Riau                                                        Gas Pipe                                                February 10, 2022
         PT Kertanegara Energi     PLTGU Senipah (117 MW)            Gas Pipa/          117         85%       2021 - 2041    11 Februari 2021/
         Perkasa                                                     Gas Pipe                                                February 11, 2021
         Pertamina dan Star        PLTP Darajat Unit 2              Panas Bumi/          90         95%       2000 - 2030     1 Februari 2000/
         Energy Geothermal Ltd                                      Geothermal                                               February 1, 2000
         Pertamina dan Star        PLTP Darajat Unit 3              Panas Bumi/         110         95%       2007 - 2037     1 Agustus 2007/
         Energy Geothermal Ltd                                      Geothermal                                                 August 1, 2007
         PT Geo Dipa Energi        PLTP Dieng                       Panas Bumi/          55         95%       2002 - 2032    11 Oktober 2002/
                                                                    Geothermal                                               October 11, 2002
Page 172
                     PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                  DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                           Lampiran 5/162 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                     NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                            FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                       JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                   (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN     PENTING,                      IKATAN           DAN     54. SIGNIFICANT AGREEMENTS, COMMITMENTS
    KONTINJENSI (lanjutan)                                                    AND CONTINGENCIES (continued)

    b.    Perjanjian jual beli tenaga listrik dan kontrak                       b.    Power purchase agreements and energy
          penjualan energi (lanjutan)                                                 sales contracts (continued)

          Sudah beroperasi (lanjutan)                                                 In operation (continued)
                                                                                                                               Tanggal Operasi
                                                                                       Kapasitas/                                 komersial/
                                                                     Bahan Bakar/       Capacity                 Periode/        Commercial
          Perusahaan/Company                 Proyek/Project              Fuel            (MW)        AF (%)       Period        Operation Date

         Perusahaan
         (lanjutan/continued)

         PT Pertamina Geothermal     PLTP Kamojang Unit 4               Panas Bumi/       60          90%       2008 - 2038     26 Januari 2008/
          Energy                                                        Geothermal                                              January 26, 2008
         PT Pertamina Geothermal     PLTP Lumut Balai                   Panas Bumi/       55          90%       2019 - 2049    1 September 2019/
          Energy                                                        Geothermal                                             September 1, 2019
         PT Supreme Energy Muara     PLTP Muara Laboh                   Panas Bumi/       80          90%       2019 - 2049   16 Desember 2019/
          Laboh                                                         Geothermal                                            December 16, 2019
         PT Geo Dipa Energi          PLTP Patuha                        Panas Bumi/       55          95%       2014 - 2044       27 September
                                                                        Geothermal                                            2014/September 27,
                                                                                                                                       2014
         PT Supreme Energy           PLTP Rantau Dedap                  Panas Bumi/       86          90%       2021 - 2051   26 Desember 2021/
          Rantau Dedap                                                  Geothermal                                            December 26, 2021
         Star Energy Geothermal      PLTP Salak Unit 4-6                Panas Bumi/       197         85%       1997 - 2040     10 Oktober 1997/
          Ltd                                                           Geothermal                                              October 10, 1997
         Sarulla Operations Ltd      PLTP Sarulla 1 Unit 1, 2           Panas Bumi/       220         90%       2017 - 2048      2 Oktober 2017/
                                                                        Geothermal                                               October 2, 2017
         Sarulla Operations Ltd      PLTP Sarulla 1 Unit 3              Panas Bumi/       110         90%       2018 - 2048        3 April 2018/
                                                                        Geothermal                                                 April 3, 2018
         PT Sorik Marapi             PLTP Sorik Marapi #3               Panas Bumi/       50          90%       2022 - 2052      7 Oktober 2022/
          Geothermal Power                                              Geothermal                                               October 7, 2022
         PT Sorik Marapi             PLTP Sorik Marapi #4               Panas Bumi/       50          90%       2023 - 2053   16 Desember 2023/
          Geothermal Power                                              Geothermal                                            December 16, 2023
         PT Pertamina Geothermal     PLTP Ulubelu Unit 3                Panas Bumi/       55          90%       2016 - 2046        26 Juli 2016/
         Energy                                                         Geothermal                                                July 26, 2016
         PT Pertamina Geothermal     PLTP Ulubelu Unit 4                Panas Bumi/       55          90%       2017 - 2047      25 Maret 2017/
          Energy                                                        Geothermal                                               March 25, 2017
         Star Energy Geothermal      PLTP Wayang Windu Unit 1           Panas Bumi/       110         95%       2000 - 2030        1 Juni 2000/
          Ltd                                                           Geothermal                                                 June 1, 2000
         Star Energy Geothermal      PLTP Wayang Windu Unit 2           Panas Bumi/       110         95%       2009 - 2039      13 Maret 2009/
          Ltd                                                           Geothermal                                               March 13, 2009
         PT Pembangkitan Jawa        PLTS Terapung Cirata               Surya/Solar       145       Variabel/   2023 - 2048   13 November 2023/
          Bali Masdar Energy                                                                        Variable                  November 13, 2023
         PT Lestari Banten Energi    PLTU Banten (1x625 MW)          Batubara/Coal        625         80%       2017 - 2042      28 Maret 2017/
                                                                                                                                 March 28, 2017
         PT Tenaga Listrik           PLTU Bengkulu (2x100 MW)        Batubara/Coal        200         80%       2020 - 2045        27 Juli 2020/
          Bengkulu                                                                                                                July 27, 2020
         PT General Energy Bali      PLTU Celukan Bawang (2x125      Batubara/Coal        380         85%       2015 - 2045       23 September
                                      & 1x130 MW)                                                                             2015/September 23,
                                                                                                                                       2015
         PT Sumber Segara            PLTU Cilacap (2x281 MW)         Batubara/Coal        562         80%       2007 - 2037     1 Februari 2007/
          Primadaya                                                                                                             February 1, 2007
         PT Sumber Segara            PLTU Cilacap Ekspansi (1x614    Batubara/Coal        614         80%       2016 - 2046       10 Juni 2016/
          Primadaya                   MW)                                                                                         June 10, 2016
         PT Cirebon Electric Power   PLTU Cirebon (1x660 MW)         Batubara/Coal        660         80%       2012 - 2042        27 Juli 2012/
                                                                                                                                  July 27, 2012
         PT Cahaya Fajar Kaltim      PLTU Embalut Ekspansi (1x50     Batubara/Coal        50          87%       2014 - 2039     14 Agustus 2014/
                                      MW)                                                                                       Agustus 14, 2014
         PT Cirebon Energy           PLTU Jawa 1/Cirebon Exp         Batubara/Coal       1000         86%       2023 - 2048        19 Mei 2023/
          Prasarana                                                                                                               May 19, 2023
         PT Bhimasena Power          PLTU Jawa Tengah 1              Batubara/Coal       1900         86%       2022 - 2047     31 Agustus 2022/
          Indonesia                                                                                                             August 31, 2022
         PT Bhumi Jati Power         PLTU Jawa-4 (FTP2) (2x1000      Batubara/Coal       2000         86%       2022 - 2047       30 September
                                      MW)                                                                                     2022/September 30,
                                                                                                                                       2022
         PT Shenhua Guohua           PLTU Jawa-7 Bojonegara          Batubara/Coal       2000         86%       2021 - 2046         8 Juli 2021/
          Pembangkitan Jawa Bali      (2x1000 MW)                                                                                  July 8, 2021
         PT Sumber Segara            PLTU Jawa-8 – Cilacap (1x945    Batubara/Coal        945         80%       2019 - 2049    9 November 2019/
          Primadaya                   MW)                                                                                      November 9, 2019
         PT Bosowa Energi            PLTU Jeneponto (2x100 MW)       Batubara/Coal        200         80%       2012 - 2042     31 Oktober 2012/
                                                                                                                                October 31, 2012
         PT Bosowa Energi            PLTU Jeneponto Ekspansi         Batubara/Coal        250         80%       2018 - 2048        1 April 2018/
                                      (2x125 MW)                                                                                   April 1, 2018
         PT GCL Indo Tenaga          PLTU Kalbar-1 (2x100 MW)        Batubara/Coal        200         80%       2021 - 2046       25 Juni 2021/
                                                                                                                                  June 25, 2021
         PT Tanjung Power            PLTU Kalsel-1 (FTP2) (2x100     Batubara/Coal        200         80%       2019 - 2044   14 Desember 2019/
          Indonesia                   MW)                                                                                     December 14, 2019
         PT SKS Listrik Kalimantan   PLTU Kalteng-1 / Kalselteng-1   Batubara/Coal        200         80%       2020 - 2045    4 November 2020/
                                      (2x100 MW)                                                                               November 4, 2020
Page 173
                      PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                   DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                             Lampiran 5/163 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                           NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                  FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                             JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                         (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN     PENTING,                        IKATAN             DAN        54. SIGNIFICANT AGREEMENTS, COMMITMENTS
    KONTINJENSI (lanjutan)                                                           AND CONTINGENCIES (continued)
    b.    Perjanjian jual beli tenaga listrik dan                                    b.    Power purchase agreements and energy
          kontrak penjualan energi (lanjutan)                                              sales contracts (continued)
          Sudah beroperasi (lanjutan)                                                      In operation (continued)
                                                                                                                                                      Tanggal Operasi
                                                                                                     Kapasitas/                                          komersial/
                                                                                  Bahan Bakar/        Capacity                         Periode/         Commercial
             Perusahaan/Company                         Proyek/Project               Fuel              (MW)            AF (%)           Period         Operation Date
         Perusahaan (lanjutan/continued)
         PT Graha Power Kaltim                PLTU Kaltim-2 (FTP2) (2x100         Batubara/Coal          200            80%         2020 - 2045           30 Juni 2020/
                                              MW)                                                                                                        June 30, 2020
         PT Indonesia Energi Dinamika         PLTU Kaltim-4 (2x100 MW)            Batubara/Coal          200            80%         2020 - 2045           14 April 2020/
         (INDOEKA)                                                                                                                                        April 14, 2020
         PT DSSP Power Kendari                PLTU Kendari-3 (2x50 MW)            Batubara/Coal          100            80%         2019 - 2044        28 Oktober 2019/
                                                                                                                                                       October 28, 2019
         PT Lombok Energy Dynamics            PLTU Lombok Timur (2x25 MW)         Batubara/Coal           50            80%         2017 - 2042           10 April 2017/
                                                                                                                                                          April 10, 2017
         PT Rekind Daya Mamuju                PLTU Mamuju (2x25 MW)               Batubara/Coal           50            80%         2018 - 2043       18 Septembe2018/
                                                                                                                                                          September 18,
                                                                                                                                                                2018
         PT Meulaboh Power Generation         PLTU Meulaboh 3 & 4                 Batubara/Coal          400            80%         2023 - 2048       31 Desember 2023/
                                              (2x200 MW)                                                                                              December 31, 2023
         PT Bukit Pembangkit Innovative       PLTU MT Banjarsari                  Batubara/Coal          220            80%         2015 - 2045           30 Juni 2015/
                                              (2x110 MW)                                                                                                 June 30, 2015
         PT Indo Ridlatama Power              PLTU MT Kaltim-1 (2x27,5 MW)        Batubara/Coal           55            80%         2018 - 2048        1 Desember 2018/
                                                                                                                                                       December 1, 2018
         PT Priamanaya Energi                 PLTU MT Keban Agung                 Batubara/Coal          240            80%         2016 - 2046            1 Mei 2016/
                                               (2x120 MW)                                                                                                  May 1, 2016
         PT Gou Hua Energi Musi               PLTU MT Simpang Belimbing           Batubara/Coal          227            80%         2013 - 2043        27 Februari 2013/
          Makmur Indonesia                     (2x113,5 MW)                                                                                            February 27, 2013
         PT DSSP Power Sumsel                 PLTU MT Sumsel-5                    Batubara/Coal          300            80%         2016 - 2041       20 Desember 2016/
                                                (2x150 MW)                                                                                            December 20, 2016
         PT Huadian Bukit Asam Power          PLTU MT Sumsel-8                    Batubara/Coal         1200            80%         2023 - 2048         7 October 2023/
                                                                                                                                                        October 7, 2023
         PT Paiton Energy                     PLTU Paiton 1 (2x610 MW)            Batubara/Coal         1220            85%         2001 - 2041          1 Januari 2001/
                                                                                                                                                        January 1, 2001
         PT Jawa Power                        PLTU Paiton 2 (2x610 MW)            Batubara/Coal         1220            83%         2000 - 2030        1 November 2020/
                                                                                                                                                       November 1, 2020
         PT Paiton Energy                     PLTU Paiton 3 (1x815 MW)            Batubara/Coal          815            85%         2012 - 2042          18 Maret 2012/
                                                                                                                                                         March 18, 2012
         PT Gorontalo Listrik Perdana         PLTU Sulbagut-1 (2x50 MW)           Batubara/Coal          100            80%         2021 - 2046       31 Desember 2021/
                                                                                                                                                      December 31, 2021
         PT Minahasa Cahaya Lestari           PLTU Sulut-3 (2x50 MW)              Batubara/Coal          100            80%         2021 - 2046            1 Juli 2021/
                                                                                                                                                           July 1, 2021
         PT Sorik Merapi Geothermal           Sorik Marapi #5                      Panas Bumi/            50            90%         2025 - 2055         1 Februari 2025/
         Power                                                                     Geothermal                                                           February 1, 2025
         PT Medco Cahaya Geothermal           Ijen #3                              Panas Bumi/            50            80%         2025 - 2055         9 Februari 2025/
                                                                                   Geothermal                                                            February 9, 2025
         PT Sumbangselenergi Sakti            PLTU MT Sumbagsel-1                 Batubara/Coal          300            80%         2025 - 2050          24 Maret 2025/
         Pewali                                                                                                                                          March 25, 2025
         PT Indo Raya Tenaga                  PLTU Jawa-9&10                      Batubara/Coal         2000            86%         2025 - 2075            2 Mei 2025/
                                                                                                                                                           May 2, 2025
         PT Pertamina Geothermal Energy       PLTP Lumut Balai #2                  Panas Bumi/            55            90%         2024 - 2054           30 Juni 2025/
                                                                                   Geothermal                                                            June 30, 2025
         Lainnya                                                                  Batubara/Coal         1,215

         PLN Batam
         PT Dalle Energy Batam                PLTG Panaran                          Gas/Gas               82            90%         2005 - 2025        1 Desember 2005/
                                                                                                                                                       December 1, 2005
         PT Mitra Energy Batam                PLTG Panaran                          Gas/Gas               56            84%         2004 - 2034        29 Oktober 2004/
                                                                                                                                                       October 29, 2004
         PT Energi Listrik Batam              PLTG Tanjung Uncang                   Gas/Gas               70            85%         2016 - 2036           1 Mei 2016/
                                                                                                                                                          May 1, 2016
         KSO PT Beringin Mas Powerindo-       PLTMG Sewa Kabil 50 MW                Gas/Gas               50            65%         2023 - 2028        4 November 2023/
         PT VPower Operation Services-                                                                                                                 November 4, 2023
         PT Supreme Energi Indonesia
         PT TJK Power                         PLTU Tanjung Kasam                  Batubara/Coal          110            85%         2012 - 2042         25 Oktober 2012/
                                                                                                                                                        October 25, 2012
         PT Maxpower Indonesia                PLTMG Baloi                           Gas/Gas               50            90%         2024 - 2029          25 April 2024/
                                                                                                                                                         April 25, 2024
         KSO PT Bagus Karya-PT CNTIC          PLTMG Tanjung Uncang                  Gas/Gas               60            90%         2024 - 2029          13 September
         Indonesia                                                                                                                                       2024/September
                                                                                                                                                            13, 2024
         Lainnya a)                                                                                      204

         Jumlah                                                                                        28,380                                                  Total
          a)   Meliputi kontrak dengan IPP, yang terdiri dari IPP berlokasi di             a)     Represents contracts with IPPs, consisting of IPPs which are located
               berbagai daerah di Indonesia, menggunakan bahan bakar                              in several areas of Indonesia which will use coal, geothermal, and mini
               batubara, panas bumi dan mini hydro dengan kapasitas masing-                       hydro for generation with each power plant’s capacity less than 50
               masing pembangkit kurang dari 50 MW.                                               MW.
Page 174
                        PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                     DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                           Lampiran 5/164 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                         NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                                FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                                           JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                       (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN      PENTING,                                      IKATAN                  DAN    54. SIGNIFICANT AGREEMENTS, COMMITMENTS
    KONTINJENSI (lanjutan)                                                                           AND CONTINGENCIES (continued)

    b.   Perjanjian jual beli tenaga listrik dan kontrak                                                   b.        Power purchase agreements and energy
         penjualan energi (lanjutan)                                                                                 sales contracts (continued)

         Belum beroperasi (dalam tahap pengembangan)                                                            Not yet in operation (development stage)
                                                                                                                        Kapasitas/
                                                                                                      Bahan bakar/       Capacity     AFb)       Periode/                    Status/
         No.               Perusahaan/Company                            Proyek/Project                  Fuel             (MW)        (%)        Perioda)                    Status
               Perusahaan
          1    PT Indo Raya Tenaga                          PLTU Jawa-9&10                      Batubara/Coal                 2,000   86%    2024 - 2049    Tahap Pembangunan/Construction Stage
          2    PT Shenhua Guohua Lion Power Indonesia       PLTU MT Sumsel -1                   Batubara/Coal                   600   80%    2023 - 2053    Tahap Pembangunan/Construction Stage
          3    PT North Sumatera Hydro Energy               PLTA Batang Toru                    Tenaga Air/Hydro                510   47%    2026 - 2056    Tahap Pembangunan/Construction Stage
          4    PT Kerinci Merangin Hidro                    PLTA Merangin                       Tenaga Air/Hydro                350   41%    2025 - 2055    Tahap Pembangunan/Construction Stage
          5    PT Supreme Energy Rantau Dedap (SERD)        Rantau Dedap #2                     Panas Bumi/Geothermal           134   90%    2025 - 2055    Eksplorasi/Exploration
          6    Star Energy Geothermal Wayang Windu          Wayang Windu #4                     Panas Bumi/Geothermal           120   90%    2028 - 2058    Potensi/Potential
          7    PT Sejahtera Alam Energy (SAE)               Baturaden #1                        Panas Bumi/Geothermal           110   90%    2025 - 2055    Eksplorasi/Exploration
          8    PT Supreme Energy Rajabasa                   Rajabasa #1                         Panas Bumi/Geothermal           110   90%    2025 - 2055    Eksplorasi/Exploration
          9    PT Supreme Energy Rajabasa                   Rajabasa #2                         Panas Bumi/Geothermal           110   90%    2029 - 2059    Eksplorasi/Exploration
         10    PT Supreme Energy Muara Laboh (SEML)         Muara Laboh #2                      Panas Bumi/Geothermal           140   90%    2025 - 2055    Eksplorasi/Exploration
         11    PT Sintesa Banten Geothermal                 Rawadano #2                         Panas Bumi/Geothermal            80   90%    2025 - 2055    Eksplorasi/Exploration
         12    PT Sejahtera Alam Energy (SAE)               Baturaden #2                        Panas Bumi/Geothermal            75   90%    2025 - 2055    Eksplorasi/Exploration
         13    Bali Energy Limited (BEL)                    Bedugul #2                          Panas Bumi/Geothermal            55   95%    2030 - 2055    Eksplorasi/Exploration
         14    Star Energy Geothermal Wayang Windu          Wayang Windu #3                     Panas Bumi/Geothermal            60   80%    2026 - 2056    Eksplorasi/Exploration
         15    PT Indo Acwa Tenaga                          Terapung Saguling                   Surya/Solar                      60   28%    2026 - 2051    Potensi/Potential
         16    PT Geo Dipa Energi                           Dieng #2                            Panas Bumi/Geothermal            55   90%    2025 - 2055    Tahap Pembangunan/Construction Stage
         17    PT Geo Dipa Energi                           Dieng #3                            Panas Bumi/Geothermal            55   90%    2028 - 2058    Eksplorasi/Exploration
         18    PT Geo Dipa Energi                           Dieng #4                            Panas Bumi/Geothermal            55   90%    2031 - 2061    Eksplorasi/Exploration
         19    Star Energy Geothermal                       Gunung Salak #7                     Panas Bumi/Geothermal            55   80%    2025 - 2055    Eksplorasi/Exploration
         20    PT Pertamina Geothermal Energy Tbk           Hululais #1                         Panas Bumi/Geothermal            55   85%    2025 - 2055    Pendanaan/Financing
         21    PT Pertamina Geothermal Energy Tbk           Hululais #2                         Panas Bumi/Geothermal            55   85%    2025 - 2055    Pendanaan/Financing
         22    PT Pertamina Geothermal Energy Tbk           Lumut Balai #3                      Panas Bumi/Geothermal            55   90%    2024 - 2054    Potensi/Potential
         23    PT Pertamina Geothermal Energy Tbk           Lumut Balai #4                      Panas Bumi/Geothermal            55   90%    2024 - 2054    Potensi/Potential
         24    PT Geo Dipa Energi                           Patuha #2                           Panas Bumi/Geothermal            55   75%    2025 - 2055    Tahap Pembangunan/Construction Stage
         25    PT Geo Dipa Energi                           Patuha #3                           Panas Bumi/Geothermal            55   75%    2028 - 2058    Eksplorasi/Exploration
         26    PT Geo Dipa Energi                           Patuha #4                           Panas Bumi/Geothermal            55   75%    2029 - 2059    Potensi/Potential
         27    PT Pertamina Geothermal Energy Tbk           Sungai Penuh #1                     Panas Bumi/Geothermal            55   90%    2028 - 2058    Potensi/Potential
         28    PT Pertamina Geothermal Energy Tbk           Sungai Penuh #2                     Panas Bumi/Geothermal            55   90%    2028 - 2058    Potensi/Potential
         29    PT Bakrie Darmakarya                         Telaga Ngebel #1                    Panas Bumi/Geothermal            55   90%    2027 - 2057    Eksplorasi/Exploration
         30    PT Bakrie Darmakarya                         Telaga Ngebel #2                    Panas Bumi/Geothermal            55   90%    2030 - 2057    Potensi/Potential
         31    PT Bakrie Darmakarya                         Telaga Ngebel #3                    Panas Bumi/Geothermal            55   90%    2030 - 2057    Potensi/Potential
         32    PT Geo Dipa Energi                           Dieng #5                            Panas Bumi/Geothermal            50   90%    2025 - 2055    Eksplorasi/Exploration
         33    PT Geo Dipa Energi                           Dieng #6                            Panas Bumi/Geothermal            50   90%    2025 - 2055    Eksplorasi/Exploration
         34    PT Nusantara Guodian Karangkates Indonesia   PLTS Terapung Karangkates           Surya/Solar                     100   25%    2026 - 2031    Potensi/Potential
         35    PT Indo Acwa Tenaga Singkarak                PLTS Terapung Singkarak             Surya/Solar                      50   25%    2026 - 2031    Potensi/Potential
               Lainnya/Othersc)                                                                                                 874

               PLN Batam
          1    Lainnya/Others                                                                   Gas                             79

               Jumlah                                                                                                        4,677                          Total



         a) Perjanjian berlaku sejak ditandatangani,                                                            a) The agreements are effective from the date of
            dan jual beli tenaga listrik berlaku antara 20                                                         signing, and buying and selling of electricity is
            sampai dengan 30 tahun sejak tanggal                                                                   valid between 20 to 30 years starting from the
            operasi komersial.                                                                                     commercial operation date.
         b) AF = Faktor pemasokan tenaga yang harus                                                             b) AF = Power supply factor which must be
            diserap Perusahaan.                                                                                    absorbed by the Company.
         c) Meliputi kontrak dengan IPP, yang terdiri                                                           c) Represents contracts with IPPs, consisting of
            dari IPP dalam tahap pembangunan dan                                                                   IPPs under construction and IPPs in the
            IPP dalam tahap pembiayaan PPA yang                                                                    financing stage, and PPAs which are located
            berlokasi di berbagai daerah di Indonesia,                                                             in several areas of Indonesia which will use
            menggunakan bahan bakar batu bara,                                                                     coal, geothermal, and mini hydro for
            panas bumi dan mini hydro dengan                                                                       generation with each power plant’s capacity
            kapasitas masing-masing pembangkit kurang                                                              less than 50 MW.
            dari 50 MW.
Page 175
                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                 Lampiran 5/165 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                              NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                     FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)            (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN     PENTING,              IKATAN             DAN     54. SIGNIFICANT AGREEMENTS, COMMITMENTS
    KONTINJENSI (lanjutan)                                              AND CONTINGENCIES (continued)

    b.   Perjanjian jual beli tenaga listrik dan kontrak                 b.   Power purchase agreements and energy
         penjualan energi (lanjutan)                                          sales contract (continued)

         Belum    beroperasi      (dalam                    tahap             Not yet in operation (development stage)
         pengembangan) (lanjutan)                                             (continued)

         Harga tenaga listrik per kWh untuk                                   The electricity power price per kWh for gas, MFO,
         pembangkitan bahan bakar gas, MFO dan                                and coal power plants is determined by certain
         batubara ditetapkan berdasarkan formula                              formulas as stated in the agreement which
         tertentu yang ditetapkan dalam perjanjian yang                       regulates, among other subjects, capital cost
         antara lain mengatur pemulihan biaya modal,                          recovery, fixed operation and maintenance cost
         pembayaran biaya tetap operasi dan                                   payment, fuel expense and variable operation
         pemeliharaan, biaya bahan bakar dan                                  and maintenance cost payment. For geothermal
         pembayaran biaya variabel operasi, dan biaya                         heat power plants, the electricity power price is
         pemeliharaan. Untuk pembangkitan yang                                determined by a certain formula as stated in the
         menggunakan panas bumi, harga tenaga listrik                         agreement, involving, among other things,
         ditetapkan berdasarkan formula tertentu                              Energy Charge and Capacity Charge.
         sebagaimana dinyatakan dalam perjanjian
         antara lain Energy Charge dan Capacity
         Charge.

         Selain dari perjanjian jual beli tenaga listrik di                   In addition to the above PPAs, the Group also
         atas, Grup juga memiliki beberapa perjanjian                         entered into rental agreements that fall into the
         sewa yang termasuk dalam kategori sewa                               category of operating leases.
         operasi.

    c.   Perolehan barang modal                                          c.   Capital expenditures

         Pada tanggal 30 Juni 2025 dan 31 Desember                            As at June 30, 2025 and December 31, 2024,
         2024, jumlah ikatan perolehan barang modal                           total commitments for capital expenditures based
         berdasarkan kontrak, terutama sehubungan                             on contracts, which are related to procurement of
         dengan pengadaan pembangkitan, jaringan                              power plants, transmission and distribution are as
         transmisi dan distribusi adalah sebagai berikut:                     follows:
                                                               30 Juni/June 30, 2025
                                                                      Jumlah
                                                                    dalam mata
                                                                   uang original/           Setara
                                                                    Amount in              Rupiah/
                                           Mata Uang/                 original             Rupiah
                                            Currency                currency*)            equivalent

         Program percepatan                                                                                            Fast track program
          Kontrak pembangkitan        USD                               31,890,638               517,617            Power plant contracts
                                      Rupiah                                                     522,326

                                                                                               1,039,943

          Kontrak transmisi           Rupiah                                                       11,892         Transmission contracts

          Kontrak konstruksi rutin    USD                              445,353,548             7,228,533     Regular construction contracts
                                      EUR                              108,595,507             2,066,753
                                      JPY                               45,951,635                 5,175
                                      Rupiah                                                  15,970,901
                                      Lain-lain/Others**)            7,840,329,151                    65

                                                                                              25,271,428

         *)    Dalam jumlah penuh                                         *)  In full amount
         **)   Perolehan barang modal dalam mata uang asing               **) Capital expenditures denominated in other foreign currencies
               lainnya disajikan dalam jumlah setara USD                      are presented as USD equivalents using the exchange rates
               menggunakan kurs tanggal pelaporan                             prevailing at the reporting date
Page 176
                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                 Lampiran 5/166 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                           NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                  FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                             JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)         (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN     PENTING,              IKATAN             DAN   54. SIGNIFICANT AGREEMENTS, COMMITMENTS
    KONTINJENSI (lanjutan)                                            AND CONTINGENCIES (continued)

    c.   Perolehan barang modal (lanjutan)                            c.   Capital expenditures (continued)
                                                      31 Desember/December 31, 2024
                                                                 Jumlah
                                                               dalam mata
                                                              uang original/          Setara
                                                               Amount in             Rupiah/
                                           Mata Uang/            original            Rupiah
                                            Currency           currency*)           equivalent

         Program percepatan                                                                                         Fast track program
          Kontrak pembangkitan        USD                           32,668,189                527,820            Power plant contracts
                                      Rupiah                                                1,110,065

                                                                                            1,637,885

          Kontrak transmisi           Rupiah                                                    42,972         Transmission contracts

          Kontrak konstruksi rutin    USD                           525,398,420             8,488,862     Regular construction contracts
                                      EUR                           228,818,741             3,849,343
                                      JPY                         5,904,439,210               610,685
                                      Rupiah                                               24,218,618
                                      Lain-lain/Others**)         7,841,413,351                 9,929

                                                                                           37,177,437

         *)    Dalam jumlah penuh                                      *)  In full amount
         **)   Perolehan barang modal dalam mata uang asing            **) Capital expenditures denominated in other foreign currencies
               lainnya disajikan dalam jumlah setara USD                   are presented as USD equivalents using the exchange rates
               menggunakan kurs tanggal pelaporan                          prevailing at the reporting date

         Jumlah di atas adalah diluar dari nilai tersisa                   The above amount excludes the remaining
         pembayaran di muka yang sudah dibayarkan                          advance payments that have been paid by the
         oleh Grup sesuai dengan masing-masing                             Group in accordance with the respective
         kontrak, yang nantinya akan mengurangi                            contracts, which then will reduce future payments
         pembayaran di masa depan yang dilakukan                           to be made by the Group.
         oleh Grup.

         Program percepatan                                                Fast track program

         Berdasarkan Peraturan Presiden Republik                           Based on Presidential Regulation of the Republic
         Indonesia No. 71 Tahun 2006 tanggal 5 Juli                        of Indonesia No. 71 Year 2006 dated July 5, 2006
         2006 yang kemudian diubah melalui Peraturan                       which was amended by Presidential Regulation
         Presiden Republik Indonesia No. 59 tanggal 23                     of the Republic of Indonesia No. 59 dated
         Desember 2009, Pemerintah menugaskan                              December 23, 2009, the Government mandates
         Perusahaan     untuk    membangun      PLTU                       the Company to build coal-fired PLTUs at 42
         berbahan bakar batubara di 42 lokasi di                           locations in Indonesia, which include ten power
         Indonesia, meliputi 10 pembangkit dengan                          plants with aggregate capacity of 7,490 MW in
         jumlah kapasitas 7.490 MW di Jawa - Bali dan                      Java - Bali and 32 power plants with aggregate
         32 pembangkit dengan jumlah kapasitas 2.769                       capacity of 2,769 MW outside Java - Bali.
         MW di luar Jawa - Bali.

         Kontrak pembangkitan                                              Power plant contracts

         Sampai dengan tanggal 30 Juni 2025,                               Until June 30, 2025, the Company has signed 37
         Perusahaan telah menandatangani 37 kontrak                        EPC contracts, which consist of ten electricity
         EPC meliputi 10 pembangkit tenaga listrik                         power plants with an aggregate capacity of 7,490
         dengan jumlah kapasitas 7.490 MW di Jawa -                        MW in Java - Bali and 27 electricity power plants
         Bali dan 27 pembangkit tenaga listrik dengan                      with an aggregate capacity of 2,489 MW outside
         jumlah kapasitas 2.489 MW di luar Jawa - Bali.                    Java - Bali. Based on the EPC contracts, the
         Berdasarkan       kontrak       EPC     tersebut,                 Company is required to pay the contractor a down
         Perusahaan diharuskan membayar uang muka                          payment, which is approximately 15% of the
         sekitar 15% dari nilai kontrak dan 85% akan                       contract price and the remaining 85% will be
         didanai melalui fasilitas kredit perbankan.                       funded through credit facilities from banks.
Page 177
                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                             Lampiran 5/167 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                     NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                            FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                       JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)   (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN     PENTING,             IKATAN      DAN     54. SIGNIFICANT AGREEMENTS, COMMITMENTS
    KONTINJENSI (lanjutan)                                      AND CONTINGENCIES (continued)

    c.   Perolehan barang modal (lanjutan)                     c.    Capital expenditures (continued)

         Program percepatan (lanjutan)                               Fast track program (continued)

         Kontrak pembangkitan (lanjutan)                             Power plant contracts (continued)

         Sampai dengan tanggal 30 Juni 2025,                         Until June 30, 2025, the Company has made a
         Perusahaan        telah      membayar     uang              down payment amounting to USD876,217,780
         muka sebesar USD876.217.780 (nilai penuh)                   (full amount) and Rp4,790,016 for 35 EPC
         dan Rp4.790.016 untuk 35 kontrak EPC yang                   contracts which is recorded as construction in
         dicatat sebagai aset dalam pembangunan                      progress (Note 6). The down payments are
         (Catatan 6). Uang muka tersebut didanai dari                funded by the proceeds of the issued Guaranteed
         hasil penerbitan Obligasi Terjamin dan                      Notes and withdrawal of credit facilities for the
         penarikan fasilitas kredit program percepatan.              fast track program.

         Kontrak transmisi                                           Transmission contracts

         Kontrak transmisi merupakan kontrak untuk                   Transmission contracts are contracts for
         peningkatan dan pembangunan transmisi baru                  upgrading and constructing new transmission
         dan gardu induk di Jawa dan luar Jawa. Proyek               and sub-stations in Java and outside Java. These
         ini dibiayai melalui dana sendiri dan penarikan             projects are financed by the Company’s own
         fasilitas kredit perbankan.                                 funds and withdrawal of credit facilities from
                                                                     banks.

         Kontrak konstruksi rutin                                    Regular construction contracts

         Ikatan pengadaan barang modal untuk                         Capital expenditure commitments for regular
         konstruksi rutin merupakan kontrak yang telah               construction represent project contracts signed
         ditandatangani untuk tambahan pembangkit                    for additional electricity generating plants and
         listrik dan pengembangan jaringan transmisi                 development of the transmission and distribution
         dan distribusi. Proyek ini dibiayai melalui dana            network. These projects are financed by the
         sendiri Perusahaan dan pihak luar melalui                   Company’s own funds and other external funding
         pinjaman luar negeri, bantuan dan proyek                    through offshore loans, grants and investment
         investasi sebagai bagian dari anggaran belanja              projects from the state budget.
         negara.

    d.   Fasilitas pinjaman yang belum digunakan               d.    Unused loan facilities

         Penerusan pinjaman                                          Two-step loans

                                                                    Dalam mata uang original/       Ekuivalen Rp/
                             Mata uang/Currency                       In original currency*)        Rp equivalent

         USD                                                                        610,000,000             9,900,910
         JPY                                                                     13,871,063,248             1,562,070

         Jumlah/Total                                                                                      11,462,980
         *) Dalam jumlah penuh                                        *) In full amounts

         Pada tanggal 30 Juni 2025 dan 31 Desember                   As at June 30, 2025 and December 31, 2024, the
         2024, fasilitas pinjaman belum digunakan                    unused facilities equivalent to Rp11,462,980 and
         setara Rp11.462.980 dan Rp11.259.183                        Rp11,259,183 bear a provision charge of 0.10%
         dikenakan provisi sebesar 0,10% - 0,34% per                 - 0.34% per annum. There is no remaining
         tahun. Tidak ada lagi fasilitas yang tidak                  facilities that do not bear any provision charge.
         dikenakan provisi. Fasilitas ini berakhir antara            These facilities will expire between 2025 and
         tahun 2025 sampai dengan 2028.                              2028.
Page 178
                         PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                      DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                     Lampiran 5/168 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                       FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                                  JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                              (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN     PENTING,                                IKATAN             DAN    54. SIGNIFICANT AGREEMENTS, COMMITMENTS
    KONTINJENSI (lanjutan)                                                               AND CONTINGENCIES (continued)

    d.    Fasilitas              pinjaman             belum              digunakan          d.     Unused loan facilities (continued)
          (lanjutan)

          Perjanjian pinjaman tidak terkait program                                                Loan agreements not related to fast track
          percepatan                                                                               program

          Pada tanggal 30 Juni 2025, rincian fasilitas                                             As at June 30, 2025, the details of unused loan
          pinjaman belum digunakan tidak terkait                                                   facilities not related to fast track program are as
          program percepatan adalah sebagai berikut:                                               follows:
                                                                                                      Fasilitas
                                                                                                      pinjaman
                                                                                      Fasilitas        belum               Tanggal
                                                                                     maksimum/      digunakan/            perjanjian/         Periode/
                                      Kreditur dan pembiayaan proyek/                 Maximum       Unused loan            Date of            Period**)
           No.                          Creditor and project funded                   facility*)     facilities*)         agreement          Tahun/Year

                      Fasilitas pinjaman dalam USD/USD loan facilities

               1      JBIC                                                                    53                    5      20 Juni 2017/             15
                      PLTU Kalselteng 2 Facility Tr. A                                                                     June 20, 2017
               2      JBIC                                                                    36                    3      20 Juni 2017/             15
                      PLTU Kalselteng 2 Facility Tr. B                                                                     June 20, 2017
               3      ADB                                                                    112                94       8 Desember 2020/            20
                      ADB 4009-INO - RBL KMP                                                                             December 8, 2020
               4      ADB                                                                    600               244      31 Desember 2021/            20
                      ADB 4164-INO - SREAP Western & Central Java                                                       December 31, 2021
               5      AIIB                                                                   310               124       10 Februari 2021/           20
                      AIIBL0292A - East Java & Bali Power Distribution                                                   February 10, 2021
               6      IBRD                                                                   500               448          7 Mei 2024/              20
                      IBRD 9557-ID ISLE-1 Program                                                                           May 7, 2024
               7      Clean Technology Fund (“CTF”)                                           15                15          7 Mei 2024/              20
                      CTF Loan TF0C1477                                                                                     May 7, 2024
               8      Canada Clean Energy and Forest Climate Fund (“CCEFC”)                   48                48          7 Mei 2024/              20
                      CCEFC Loan TF0C1478                                                                                   May 7, 2024

                      Jumlah dalam USD/Total in USD                                        1,673               980


                      Fasilitas pinjaman dalam EUR/EUR loan facilities

               1      KfW                                                                     85                82      15 Desember 2017/            15
                      Power Plant Kumbih                                                                                December 15, 2017
               2      KfW                                                                    150               147       11 Oktober 2018/            15
                      Geothermal Energy Program                                                                          October 11, 2018
               3      KfW                                                                    225               219      5 September 2019/            14
                      Bakaru I + II Hydro Power Project`                                                                September 5, 2019
               4      KfW                                                                     70                67      5 September 2019/            14
                      1000 Islands Renewable Energy for electrification Program                                         September 5, 2019
               5      Mizuho Bank                                                             85                85         13 Maret 2020/            12
                      Riau Peaker - Finnvera Covered Facility                                                             March 13, 2020
               6      KfW                                                                    255                    -    8 Desember 2020/            15
                      KfW 29069 - RBL SNT                                                                                December 8, 2020
               7      KfW                                                                     58                58      22 Desember 2022/            15
                      Sustainable Hydropower Programmer I - Sawangan Hydropower                                         December 22, 2022
                      Plant (HPP)
               8      KfW                                                                     64                64      28 Desember 2023/              5
                      RBL SREAP Western and Central Java                                                                December 28, 2023

                      Jumlah dalam EUR/Total in EUR                                          991               722


          *)       Dalam jutaan                                                                                                                                 *) In million
         **)       Termasuk masa tenggang                                                                                                          **) Include grace period
Page 179
                     PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                  DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                     Lampiran 5/169 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                 NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                        FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                                   JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                               (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN     PENTING,                             IKATAN               DAN      54. SIGNIFICANT AGREEMENTS, COMMITMENTS
    KONTINJENSI (lanjutan)                                                                AND CONTINGENCIES (continued)

    d.    Fasilitas          pinjaman              belum             digunakan               d.     Unused loan facilities (continued)
          (lanjutan)

          Perjanjian pinjaman tidak terkait program                                                 Loan agreements not related to fast track
          percepatan (lanjutan)                                                                     program (continued)

                                                                                                       Fasilitas
                                                                                                       pinjaman
                                                                                       Fasilitas        belum               Tanggal
                                                                                      maksimum/      digunakan/            perjanjian/           Periode/
                                   Kreditur dan pembiayaan proyek/                     Maximum       Unused loan            Date of              Period**)
          No.                        Creditor and project funded                       facility*)     facilities*)         agreement            Tahun/Year

                  Fasilitas pinjaman dalam JPY/JPY loan facilities

            1     JBIC                                                                     16,939             1,830        20 Juni 2017/                15
                  PLTU Kalselteng 2                                                                                        June 20, 2017

                  Jumlah dalam JPY/Total in JPY                                            16,939             1,830

                  Fasilitas pinjaman dalam Rupiah/Rupiah loan facilities

            1     BRI                                                                  20,000,000                    -       21 Juni 2025/                1
                  Kredit Modal Kerja Standby Loan (Revolving)                                                               June 21, 2025
            2     BNI (Agen Sindikasi)                                                  5,071,000           801,941      18 Desember 2019/              10
                  11 proyek PLTU dan PLTMG Tahap I                                                                       December 18, 2019
            3     BSI (Agen Sindikasi)                                                  2,846,000           870,358      18 Desember 2019/              10
                  4 proyek PLTU dan PLTMG Tahap II                                                                       December 18, 2019
            4     BCA (Bilateral)                                                       3,000,000         3,000,000        3 Februari 2025/               1
                  Corporate Loan Facilities BCA 2019 - Revolving                                                           February 3, 2025
            5     Bank Danamon                                                          2,000,000         2,000,000        3 Februari 2025/               1
                  Kredit Modal Kerja 2019 - Danamon - Revolving Syariah                                                    February 3, 2025
            6     LPEI                                                                  3,500,000         2,000,000        3 Februari 2025/               2
                  Kredit Modal Kerja 2021 - LPEI Revolving                                                                 February 3, 2025
            7     MUFG Bank                                                             1,000,000         1,000,000      30 September 2024/               1
                  Kredit Modal Kerja 2022 - Bank MUFG - Revolving                                                        September 30, 2024
            8     PT Bank QNB Indonesia Tbk                                               500,000           500,000      21 September 2024/               1
                  Kredit Modal Kerja 2022 - Bank QNB - Revolving                                                         September 21, 2024
            9     BNI                                                                     108,607           108,607         16 Juni 2025/                 1
                  Kredit Modal Kerja 2022 - BNI - Revolving                                                                 June 16, 2025
           10     Bank Permata                                                          2,750,000           268,146       8 Desember 2022/              10
                  PLTU Timor 2x5 MW Tahap III                                                                             December 8, 2022
           11     Bank Mandiri (Agen Sindikasi)                                        10,000,000         7,898,911      29 Desember 2023/              10
                  Bank loan Capex Sindikasi 2023 - Konvensional                                                          December 29, 2023
           12     PT SMI                                                                1,000,000           338,920      29 Desember 2023/              10
                  Bank Loan Capex Bilateral 2023 - Konvensional PT SMI                                                   December 29, 2023
           13     PT SMI                                                                1,000,000           306,014      29 Desember 2023/              10
                  Bank Loan Capex Bilateral 2023 - Syariah PT SMI                                                        December 29, 2023
           14     Permata                                                               1,000,000         1,000,000       29 Februari 2024/             10
                  Kredit Modal Kerja 2024 - Bank Permata - Revolving                                                      February 29, 2024
           15     Bank Mandiri                                                         15,000,000                    -    26 Juni 2025/                 10
                  Bank Loan Capex Bilateral 2025 - Bank Mandiri                                                      -   Juny 26, 2025                  xx

                  Jumlah dalam Rupiah/Total in Rupiah                                  68,775,607        20,092,897

          *) Dalam jutaan                                                                                                                                          *) In million
          **)Termasuk masa tenggang                                                                                                                   **) Include grace period




                                                                           30 Juni/                    31 Desember/
                                                                           June 30,                    December 31,
                                                                             2025                          2024
         Tingkat suku bunga per tahun                                                                                                         Interest rate per annum
           USD                                                        4.28% - 6.25%                    4.28% - 7.26%                                            USD
           JPY                                                        0.02% - 1.73%                    0.02% - 1.73%                                             JPY
           EUR                                                        0.98% - 2.54%                    0.98% - 4.75%                                            EUR
           Rupiah                                                     6.67% - 8.55%                    5.00% - 8.55%                                          Rupiah
Page 180
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                               Lampiran 5/170 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                           NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                  FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                             JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)         (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN     PENTING,             IKATAN        DAN       54. SIGNIFICANT AGREEMENTS, COMMITMENTS
    KONTINJENSI (lanjutan)                                          AND CONTINGENCIES (continued)

    e.   Program operasi dan pemeliharaan                            e.    Operation and maintenance programs

         Untuk meningkatkan dan memulihkan daya                            In order to improve and restore the performance
         guna unit pembangkit sampai pada tingkat                          of generator units up to a certain level, the
         tertentu,    Perusahaan     menandatangani                        Company has entered into Operation and
         Operation and Maintenance Agreement                               Maintenance Agreements with contractors. The
         dengan beberapa kontraktor. Nilai kontrak                         contract payment comprises fixed and variable
         terdiri dari porsi tetap dan tidak tetap.                         portions. The contractors have to meet certain
         Kontraktor diharuskan memenuhi target                             targets and will be charged a penalty if these
         tertentu dan akan dikenakan denda jika target                     targets are not met. The commitments with the
         tersebut tidak tercapai. Komitmen dengan                          contractors for the fixed portion are as follows:
         kontraktor untuk porsi tetap adalah sebagai
         berikut:
                                                                                        Nilai kontrak
                  Pembangkitan/                     Kontraktor/                        setara/Contract             Periode/
                   Power plant                      Contractors                      amount equivalent Rp           Period

         PLTU Tanjung Jati B           PT Komipo Pembangkitan Jawa Bali                             946,330       2011 - 2032
         PLTU Tanjung Jati B           Konsorsium/Consortium of
                                       Fortum Service OY & PT Medco Energy                          299,840       2005 - 2029

         Jumlah                                                                                   1,246,170         Total

    f.   Kontinjensi                                                  f.     Contingencies

         (i)   Pada Januari 2025, BANI mengirim Surat                        (i)   In January 2025, BANI sent a letter to PLN,
               kepada PLN Nomor: 25.001/I/BANI/WD-dr                               Reference Number: 25.001/I/BANI/WD-dr,
               tanggal 3 Januari 2025 Hal: Penyelesaian                            dated January 3, 2025, regarding the
               Perkara Nomor: 47086/XII/ARB-BANI/2024                              Resolution of Case Number: 47086/XII/ARB-
               antara BUT Hyundai Engineering Co., Ltd                             BANI/2024,     between      BUT     Hyundai
               sebagai Pemohon melawan PT PLN                                      Engineering Co., Ltd as the Claimant and PT
               (Persero) sebagai Termohon yang diajukan                            PLN (Persero) as the Respondent, filed by
               oleh G&T Law Firm selaku kuasa hukum BUT                            G&T Law Firm as legal counsel for BUT
               Hyundai Engineering Co., Ltd;                                       Hyundai Engineering Co., Ltd.

               Bahwa dalam uraian permohonan arbitrase                             Whereas in the statement of claim for
               terkait dengan pelaksanaan Perjanjian                               arbitration, the dispute arises from the
               Pembangunan          PLTU       yang     telah                      execution of the Power Plant Construction
               menimbulkan perselisihan antara Pemohon                             Agreement, which has led to disagreements
               dan Termohon yang diantaranya mengenai :                            between the Claimant and the Respondent,
               (a) Biaya Perpanjangan Waktu (Prolongation                          including: (a) Prolongation Costs (b)
               Cost) (b) Biaya Tambahan Akibat Penundaan                           Additional Costs Arising form the Delay in
               Pekerjaan      Commissioning      (c)    Biaya                      Commisioning Works (c) Compensation
               Kompensasi akibat Variation Order (d) Biaya                         Costs Due to Variation Orders (d)
               Kompensasi Penerbitan Penundaan Taking                              Compensation Costs for the Issuance of
               Over (e) Biaya Keterlambatan Putusan                                Taking of Over Delay (e) Costs Incurred Due
               Arbitrase No. 46050/ 2024. Perselisihan ini                         to the Delay in Arbitral Award No.
               timbul sebagai akibat langsung dari terjadinya                      46050/2025. The dispute arose as a direct
               peristiwa kebakaran yang disebabkan oleh                            consequence of a fire incident caused by the
               kelalaian Termohon sehingga mengakibatkan                           Respondent’s negligence, which resulted in
               penundaan penyelesaian Pembangunan                                  delays in the completion of the construction of
               PLTU serta timbulnya biaya-biaya (dampak                            the Power Plant (PLTU) and caused
               finansial) yang signifikan bagi Pemohon.                            significant costs (financial impact) to the
                                                                                   Claimant.

               Total tuntutan dalam Permohonan Arbitrase                           The relief sought in the arbitration claim
               merupakan total biaya tambahan EOT-2 yang                           comprises the total additional costs of EOT-2
               dianggap Pemohon disebabkan atas                                    which the Claimant considers to have arisen
               terjadinya peristiwa kebakaran oleh kelalaian                       due to the fire incident caused by the
               Termohon        dengan     nilai    sebesar:                        Respondent's negligence, amounting to,
               USD20.149.577;                  EUR278.725;                         amounting to: USD 20,149,577; EUR
               JPY796.158.191; Rp369.342.705.145.                                  278,725; JPY 796,158,191; and IDR
                                                                                   369.342.705.145.
Page 181
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/171 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                           NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                  FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                             JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)         (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN     PENTING,              IKATAN         DAN       54. SIGNIFICANT AGREEMENTS, COMMITMENTS
    KONTINJENSI (lanjutan)                                            AND CONTINGENCIES (continued)

    f.   Kontinjensi (lanjutan)                                      f.   Contingencies (continued)

                 Bahwa sampai dengan bulan Maret 2025,                            As of March 2025, this arbitration petition
                 permohonan arbitrase ini telah sampai                            has reached the stage of Answer and
                 pada     tahap     Jawaban     Jinawab.                          Counter-Answer. The next hearing will
                 Selanjutnya persidangan akan dilanjutkan                         proceed with the Interim Decision on July 3,
                 dengan agenda Putusan Sela pada 3 Juli                           2025
                 2025.

         (ii) Pada tanggal 12 November 2024,                              (ii) On November 12, 2024, the Company
              Perusahaan menghadapi Permohonan                                 faced a request forArbitration filed by PT
              Arbitrase yang diajukan oleh PT Boustead                         Boustead Maxitherm Industries (“BMI”) as
              Maxitherm Industries (“BMI”) sebagai                             the Claimant against the Company as the
              Pemohon melawan Perusahaan sebagai                               1st Respondent and PT Modern Widya
              Termohon 1 dan PT Modern Widya Tehnical                          Tehnical (“MWT”) as the 2nd Respondent at
              (“MWT”) sebagai Termohon 2 di International                      the International Court of Commerce (“ICC”)
                                                                               regarding the PLTU 2 Papua construction
              Court of Commerce (“ICC”) terkait proyek
                                                                               project. In its application, BMI submitted
              pembangunan PLTU 2 Papua. Dalam                                  several claims, namely: (i) that the
              permohonannya, BMI mengajukan beberapa                           Company was late in conducting land
              klaim yaitu: (i) bahwa Perusahaan terlambat                      handover, (ii) the Company was late in
              dalam melakukan serah terima lahan, (ii)                         conducting land acquisition for the jetty
              Perusahaan terlambat dalam melakukan                             location, (iii) the Company failed to provide
              pembebasan lahan untuk lokasi jetty, (iii)                       stable electricity during the reliability run test
              Perusahaan gagal dalam menyediakan listrik                       (RR Test), (iv) the Company failed to issue
              yang stabil selama uji coba reliability run, (iv)                Taking Over Certificate (TOC) for both units
              Perusahaan gagal menerbitkan Taking Over                         as required in the contract and (v) the
              Certificate (TOC) untuk kedua unit seperti                       Company has unlawfully liquidated the
              yang dipersyaratkan dalam kontrak dan (v)                        Bank Guarantee of BMI. The amount of
              Perusahaan telah mencairkan Bank Garansi                         claims submitted by BMI amounted to
              BMI secara melawan hukum. Jumlah klaim                           Rp203,795,009,232 and USD 6,174,066.
              yang      diajukan   BMI     yaitu     sebesar
              Rp203.795.009.232 dan USD 6.174.066.

                 Atas permohonan arbitrase tersebut, pada                         Upon the request for arbitration, on
                 tanggal 14 Februari 2025, Perusahaan                             February 14, 2025, the Company has
                 telah   mendaftarkan    Jawaban      atas                        registered the Answer to the Request and
                 Permohonan dan penunjukkan co-arbiter.                           the appointment of co-arbiter.

                 Sampai saat ini, proses ICC sedang dalam                         Currently, the ICC process is in the stage of
                 tahap penyusunan Kerangka Acuan/TOR                              preparing the Terms of Reference/TOR by
                 oleh Arbiter, dimana penyusunan Kerangka                         the Arbitrator, where the deadline for
                 Acuan/TOR diberikan tenggat waktu hingga                         preparing the Terms of Reference/TOR is
                 31 Juli 2025 (Sebelumnya 30 Juni 2025).                          31 July 2025 (previously June 30, 2025).

         (iii)   Pada 13 Januari 2025, Perusahaan                         (iii)    On January 13, 2025, the Company faced
                 menghadapi permohonan arbitrase yang                              an arbitration request filed by Sinohydro
                 diajukan oleh Sinohydro Corporation                               Corporation     Limited     through   the
                 Limited melalui ke Badan Arbitrase                                Indonesian National Arbitration Board
                 Nasional Indonesia (“BANI”) dengan                                (“BANI”) with case register Number
                 register perkara Nomor 48002/I/ARB-                               48002/I/ARB-BANI/2025.
                 BANI/2025.

                 Permohonan        arbitrase     dimaksud                          The arbitration request is based on
                 didasarkan pada Perjanjian Nomor                                  Agreement                      Number
                 0846.PJ/041/DIR/2014 terkait Jatigede                             0846.PJ/041/DIR/2014 regarding the
                 Hydro Power Plant Project (2x55MW)                                Jatigede Hydro Power Plant Project
                 antara PLN dan Konsorsium Sinohydro                               (2x55MW) between PLN and the
                 Corporation Limited - PT PP (Persero) Tbk                         Sinohydro Corporation Limited - PT PP
                 yang ditandatangani pada tanggal 19                               (Persero) Tbk Consortium which was
                 Desember 2014.                                                    signed on December 19, 2014.
Page 182
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/172 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                       NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                              FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                         JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)     (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN     PENTING,            IKATAN        DAN      54. SIGNIFICANT AGREEMENTS, COMMITMENTS
    KONTINJENSI (lanjutan)                                        AND CONTINGENCIES (continued)

    f.   Kontinjensi (lanjutan)                                  f.   Contingencies (continued)

             Dalam pelaksanaan pekerjaan proyek                           In the implementation of the Jatigede Hydro
             pembangunan Jatigede Hydro Power Plant                       Power Plant Project (2x55MW) construction
             Project (2x55MW) terdapat beberapa                           project, there were several obstacles,
             kendala     antara    lain   keterlambatan                   including delays in the handover of the power
             penyerahan      lahan    pembangkit     dan                  plant land and prolongation work due to
             prolongation work akibat Covid-19 sehingga                   Covid-19, which had an impact on changes
             berdampak      pada    perubahan     jadwal                  to the work schedule/extension of time, so
             pelaksanaan pekerjaan/extention of time                      that the Contractor submitted a claim for
             sehingga Kontraktor mengajukan klaim                         additional costs to be evaluated by PLN,
             biaya tambahan untuk dilakukan evaluasi                      assisted by PT Prima Layanan Nasional
             oleh PLN yang didampingi oleh PT Prima                       Enjiniring as the Employer Representative.
             Layanan Nasional Enjiniring sebagai
             Employer Representative.

             Hasil evaluasi dan kesepakatan para pihak                    The results of the evaluation and agreement
             dituangkan dalam Statement of Agreement                      of the parties are stated in the Statement of
             klaim batch 1 tanggal 4 Januari 2023 dan                     Agreement for claim batch 1 on January 4,
             Statement of Agreement klaim batch 2                         2023 and the Statement of Agreement for
             tanggal 26 Juli 2023 yang pada intinya                       claim batch 2 on July 26, 2023 which
             menyepakati hal-hal sebagai berikut:                         essentially agree on the following:
             1) Mengajukan review atas nilai klaim                        1) Submit a review of the claim value to
                  kepada BPKP dengan nilai total klaim                         BPKP with a total claim value of
                  sebesar Rp547.037.165.047,-;                                 Rp547,037,165,047;
             2) Sinohydro       Corporation     Limited                   2) Sinohydro         Corporation       Limited
                  meminta pembayaran terlebih dahulu                           requests an advance payment of 50%
                  sebesar 50% dari nilai klaim, paralel                        of the claim value, parallel to the BPKP
                  dengan proses review BPKP;                                   review process;
             3) Pembayaran nilai akhir klaim akan                         3) Payment of the final claim value will be
                  dilakukan dan disesuaikan dengan                             made and adjusted to the results of the
                  hasil review BPKP.                                           BPKP review.


             Sesuai dengan Statement of Agreement di                      In accordance with the Statement of
             atas, PLN telah melakukan pembayaran                         Agreement above, PLN has made partial
             sebagian nilai klaim dengan total nilai                      payment of the claim value with a total value
             sebesar Rp223.103.411.765,-.                                 of IDR223,103,411,765.

             Berdasarkan Laporan Hasil Audit BPKP,                        Based on the BPKP Audit Result Report, it is
             diketahui total nilai klaim yang disetujui                   known that the total value of the approved
             hanya      sebesar     Rp207.078.406.265,-                   claim is only IDR207,078,406,265, - with the
             dengan pertimbangan salah satunya karena                     consideration that one of them is because
             klaim tidak didukung bukti, atau bukti tidak                 the claim is not supported by evidence, or the
             lengkap dan duplikasi pengajuan klaim.                       evidence is incomplete and duplication of
                                                                          claim submissions.

             Atas hasil review tersebut di atas, Kontraktor               Based on the aforementioned review results,
             menyatakan bahwa Kontraktor tidak setuju                     the Contractor states that it disagrees with
             dengan hasil review klaim dari BPKP dan                      the BPKP's claim review and, through its
             melalui Kuasa Hukumnya mengajukan                            attorney, has filed an Arbitration Request
             Permohonan Arbitrase kepada BANI dengan                      with BANI, registered under case number
             register perkara Nomor 48002/I/ARB-                          48002/I/ARB-BANI/2025, dated January 13,
             BANI/2025 tanggal 13 Januari 2025 dengan                     2025, requesting payment of the remaining
             nilai gugatan pembayaran sisa nilai klaim                    claim amount of Rp339,958,758,782.
             sebesar Rp339.958.758.782,-.
Page 183
                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                             Lampiran 5/173 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                     NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                            FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                       JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)   (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN     PENTING,            IKATAN       DAN     54. SIGNIFICANT AGREEMENTS, COMMITMENTS
    KONTINJENSI (lanjutan)                                      AND CONTINGENCIES (continued)

    f.   Kontinjensi (lanjutan)                                f.   Contingencies (continued)

                Bahwa seluruh rangkaian persidangan                       The entire series of hearings have been
                telah dilaksanakan dengan pemeriksaan                     conducted, with the examination and
                dan penanganan perkara arbitrase Nomor                    handling of arbitration case number
                48002/I/ARB-BANI/2025 dipimpin oleh                       48002/I/ARB-BANI/2025 chaired by Dr. Ir.
                Bapak Dr. Ir. Yudi Halimanan, S.H., M.M.,                 Yudi Halimanan, S.H., M.M., M.H.,
                M.H., FCBArb., FIIArb. selaku Arbiter                     FCBArb., FIIArb., as sole arbitrator,
                Tunggal dibantu Lina Sari, S.H. selaku                    assisted by Lina Sari, S.H., as secretary
                Sekretaris Arbiter.                                       arbitrator.

                Pada hari Rabu tanggal 18 Juni 2025,                      On Wednesday, June 18, 2025, a hearing
                telah diagendakan sidang pembacaan                        was scheduled to read out BANI Decision
                Putusan BANI Nomor 48002/I/ARB-                           No. 48002/I/ARB-BANI/2025. The Sole
                BANI/2025 dengan hasil pada intinya                       Arbitrator ultimately ruled that PLN must
                Arbiter Tunggal memutuskan PLN untuk                      pay the remaining claim amount of
                membayar sisa kewajiban nilai klaim                       Rp92,944,528,650          (27,4%)     from
                sebesar Rp92.944.528.650,- (sebesar                       Sinohydro's      lawsuit,   amounting    to
                27,4%) dari Gugatan Sinohydro sebesar                     Rp339,958,758,782 (PLN successfully
                Rp339.958.758.782,-   (PLN    berhasil                    reduced         claim       amount       by
                mengurangi     nilai klaim    sebesar                     Rp247,014,230,132, or 72.6%).
                Rp247.014.230.132,-    atau   sebesar
                72,6%).

                Bahwa    dengan    mempertimbangkan                      Considering the Statement of Agreement
                Statement of Agreement dan Laporan                       and the BPKP Audit Report, to maximize
                Hasil   Audit  BPKP,     untuk    lebih                  the outcome of the legal case, PLN will
                memaksimalkan     hasil   penanganan                     pursue legal action to annul the BANI
                perkara hukum dimaksud, PLN akan                         Decision through the District Court.
                menempuh upaya hukum pembatalan
                Putusan BANI melalui Pengadilan Negeri.

         (iv)   Grup juga menghadapi gugatan ganti rugi              (iv) The Group is also facing claims for
                dalam jumlah yang tidak material di                       compensation in immaterial amounts at
                beberapa lokasi bangunan jaringan                         several transmission or distribution network
                transmisi atau distribusi, perselisihan                   building     locations,    disputes     with
                dengan karyawan, perkara dengan                           employees, cases with customers and
                pelanggan dan pemasok. Terhadap                           suppliers. Regarding immaterial claims,
                gugatan yang tidak material tersebut,                     management follows up in accordance with
                manajemen menindaklanjutinya sesuai                       the provisions of applicable laws and
                dengan ketentuan peraturan perundang-                     regulations. Management believes that
                undangan yang berlaku. Manajemen                          these claims are not material and do not
                berpendapat klaim-klaim tersebut tidak                    affect the Group's business activities.
                material dan tidak mempengaruhi
                kegiatan usaha Grup.

                Sampai dengan tanggal penyelesaian                          As of the completion date of these
                laporan keuangan konsolidasian ini, atas                  consolidated financial statements, the
                litigasi-litigasi yang masih dalam proses                 litigation that is still in process cannot be
                tersebut, belum dapat diestimasikan                       estimated reliably and management is of
                secara         andal    dan    manajemen                  the opinion that the Group has a strong
                berpendapat bahwa Grup memiliki dasar                     basis in these cases, so that the allowance
                yang kuat dalam perkara tersebut,                         for losses recorded in these consolidated
                sehingga penyisihan kerugian yang                         financial statements is sufficient to cover
                dibukukan dalam laporan keuangan                          possible future losses.
                konsolidasian ini cukup untuk menutupi
                kemungkinan kerugian di masa yang
                akan datang.
Page 184
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                             Lampiran 5/174 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                             FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                        JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)    (Expressed in millions of Rupiah, unless otherwise stated)

55. INSTRUMEN KEUANGAN, MANAJEMEN RISIKO                    55. FINANCIAL INSTRUMENTS, FINANCIAL RISK
    KEUANGAN DAN MANAJEMEN MODAL                                AND CAPITAL MANAGEMENT

    a.   Kategori      dan     klasifikasi    instrumen         a.   Categories and         classes      of    financial
         keuangan                                                    instruments

         Pada tanggal 30 Juni 2025 dan 31 Desember                   As at June 30, 2025 and December 31, 2024, the
         2024, Grup mengklasifikasikan kas dan setara                Group classified its cash and cash equivalents,
         kas, piutang usaha, piutang dari Pemerintah,                trade receivables, receivables from Government,
         piutang lain-lain, piutang pihak berelasi,                  other receivables, receivables from related
         rekening bank dibatasi penggunaannya, dan                   parties, restricted cash in banks and short-term
         investasi      jangka     pendek       sebesar              investments amounting to Rp164,696,297
         Rp164.696.297          (Desember         2024:              (December 2024: Rp143,002,650) as financial
         Rp143.002.650) sebagai aset keuangan yang                   assets at amortised cost and derivative assets
         diukur pada biaya perolehan diamortisasi dan                were classified by the Group as derivative
         aset derivatif yang diklasifikasikan oleh Grup              financial instruments through profit or loss
         sebagai instrumen keuangan derivatif yang                   amounting to Rp1,088,898 (December 2024:
         dicatat pada laba rugi sebesar Rp1.088.898                  Rp1,123,550).
         (Desember 2024: Rp1.123.550).

         Pada tanggal 30 Juni 2025 dan 31 Desember                   As at June 30, 2025 and December 31, 2024,, the
         2024, Grup mengklasifikasikan utang usaha,                  Group classified its trade payables, accrued
         biaya masih harus dibayar, uang jaminan                     expenses, customer security deposits, project
         langganan, utang biaya proyek, utang                        cost payables, accrued expenses, two-step
         penerusan pinjaman, utang kepada Pemerintah                 loans, Government and non-bank Government
         dan lembaga keuangan Pemerintah nonbank,                    financial institution loans, lease liabilities, bank
         utang sewa, utang bank, utang obligasi dan                  loans, bonds payable and sukuk ijara, electricity
         sukuk ijarah, utang listrik swasta, dan utang               purchase payables, and other payables
         lain-lain sebesar Rp529.112.225 (Desember                   amounting to Rp529,112,225 (December 2024:
         2024: Rp516.099.664) sebagai kewajiban                      Rp516,009,664) as financial liabilities carried at
         keuangan yang diukur pada biaya perolehan                   amortised cost and derivative liabilities were
         diamortisasi dan liabilitas derivatif yang                  classified by the Group as derivative financial
         diklasifikasikan oleh Grup sebagai instrumen                instruments through profit or loss amounting to
         keuangan derivatif yang dicatat pada laba rugi              Rp1,834,515 (December 2024: Rp61,781).
         sebesar Rp1.834.515 (Desember 2024:
         Rp61.781).

     b. Manajemen modal                                         b.   Capital management

         Grup mengelola risiko modal untuk memastikan                The Group manages capital risk to ensure that it
         bahwa mereka akan mampu untuk melanjutkan                   will be able to continue as a going concern and to
         kelangsungan usaha dan untuk memastikan                     ensure compliance with the covenants of the
         pemenuhan batasan rasio kecukupan modal.                    capital adequacy ratio. The Group’s capital
         Struktur modal Grup terdiri dari pinjaman                   structure consists of debt (Notes 24, 25, 26, 27,
         (Catatan 24, 25, 26, 27, 28 dan 29) dan ekuitas             28 and 29) and equity attributable to owners of
         pemegang saham induk, yang terdiri dari modal               the parent consisting of capital stock (Note 21),
         yang ditempatkan (Catatan 21), saldo laba, dan              retained earnings, and additional paid-in capital
         tambahan modal disetor (Catatan 22).                        (Note 22).

         Direksi Grup secara berkala melakukan                       Board of Directors of the Group periodically
         tinjauan struktur permodalan Grup. Sebagai                  review the Group’s capital structure. As part of
         bagian      dari   tinjauan   ini,  Direksi                 this review, the Board of Directors considers the
         mempertimbangkan biaya permodalan dan                       cost of capital and related risks.
         risiko yang berhubungan.
Page 185
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                             Lampiran 5/175 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                             FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                        JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)    (Expressed in millions of Rupiah, unless otherwise stated)

55. INSTRUMEN KEUANGAN, MANAJEMEN RISIKO                    55. FINANCIAL INSTRUMENTS, FINANCIAL RISK
    KEUANGAN    DAN  MANAJEMEN   MODAL                          AND CAPITAL MANAGEMENT (continued)
    (lanjutan)

    b.   Manajemen modal (lanjutan)                             b.   Capital management (continued)

         Batasan pinjaman Grup mensyaratkan antara                   The Group’s loan covenants require among other
         lain pemenuhan rasio pinjaman terhadap                      things, the fulfillment of a certain debt to equity
         ekuitas dan      rasio kecukupan modal.                     ratio and capital adequacy ratio. Management
         Manajemen      secara   berkala  memonitor                  regularly monitors such requirements to ensure
         persyaratan tersebut untuk memastikan tidak                 that there are no defaults on the loans of the
         terdapat pelanggaran dalam batasan pinjaman                 Company.
         Perusahaan.

         Grup berusaha untuk meminimalkan biaya                      The Group aims to minimise the cost of debt in
         pinjaman sehingga dapat memaksimalkan nilai                 order to maximise its value. Therefore, in its
         Grup. Oleh karena itu, kebijakan Grup dalam                 financing policies, the Group always takes into
         mencari pendanaan melalui utang selalu                      account the financial risk that may arise in the
         memperhitungkan risiko keuangan yang                        future.
         mungkin timbul di masa depan.

    c. Tujuan dan kebijakan manajemen risiko                    c.   Financial risk management objectives and
        keuangan                                                     policies

         Tujuan dan kebijakan manajemen risiko                       The objectives and policies of the Group’s
         keuangan Grup adalah untuk memastikan                       financial risk management are to ensure that
         bahwa sumber daya keuangan yang memadai                     adequate financial resources are available for the
         tersedia untuk operasi dan pengembangan                     operation and development of their business,
         bisnis, serta untuk mengelola risiko pasar                  while managing their exposure to market risks
         (termasuk risiko mata uang asing dan risiko                 (including foreign currency risk and interest rate
         tingkat suku bunga), risiko kredit dan risiko               risk), credit risk and liquidity risk. The Group
         likuiditas. Grup beroperasi dengan kebijakan                operates within defined policies approved by the
         yang telah ditentukan oleh Direksi.                         Directors.

         Dalam pengelolaan risiko, Grup membentuk                    In managing those risks, the Group established a
         Direktorat     Manajemen        Risiko     yang             Directorate of Risk Management which is
         bertanggung jawab terhadap penyusunan                       responsible for the preparation of the policies, the
         kebijakan,     kerangka     kerja,     pedoman              relevant frameworks, implementation guidelines
         penerapan manajemen risiko dan infrastruktur                and      the    necessary     risk   management
         pengelolaan      risiko,  serta     memastikan              infrastructure to ensure the implementation of risk
         implementasi manajemen risiko tersebut di                   management in the Group’s environment. The
         lingkungan Grup. Direktorat ini juga bertugas               directorate is also established to facilitate a
         untuk memfasilitasi penyusunan profil risiko                strategic risk profile as an early warning to the
         yang bersifat strategis sebagai himbauan awal               Group’s management.
         kepada manajemen Grup.

         Grup telah menetapkan taksonomi risiko                      The Group has established a risk taxonomy by
         dengan membagi risiko menjadi lima kelompok                 dividing risk into five categories, such as
         yaitu risiko strategis, risiko keuangan, risiko             strategic risk, financial risk, operational risk,
         operasional, risiko proyek, dan risiko                      project risk and compliance risk. Financial risk
         kepatuhan. Risiko keuangan diantaranya                      includes market risk (including foreign currency
         adalah risiko pasar (termasuk risiko mata uang              risk and interest rate risk), credit risk, and liquidity
         asing dan risiko tingkat suku bunga), risiko                risk. In managing those risks, the Group
         kredit, dan risiko likuiditas. Dalam mengelola              considers prioritisation based on risk level. Risk
         risiko, Grup mempertimbangkan skala prioritas               level is determined by the level of possibility and
         yang didasarkan pada tingkat risikonya. Tingkat             scale of potential impact.
         risiko    ditentukan     berdasarkan     tingkat
         kemungkinan terjadinya dan skala dampak
         yang ditimbulkan.
Page 186
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                             Lampiran 5/176 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                       NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                              FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                         JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)     (Expressed in millions of Rupiah, unless otherwise stated)

55. INSTRUMEN KEUANGAN, MANAJEMEN RISIKO                     55. FINANCIAL INSTRUMENTS, FINANCIAL RISK
    KEUANGAN    DAN  MANAJEMEN   MODAL                           AND CAPITAL MANAGEMENT (continued)
    (lanjutan)

    c.   Tujuan dan kebijakan manajemen risiko                   c.   Financial risk management objectives and
         keuangan (lanjutan)                                          policies (continued)

         Terkait dengan risiko keuangan, Grup telah                   Related to financial risks, the Group has
         menetapkan kebijakan manajemen untuk                         established management’s policy related to
         melakukan transaksi lindung nilai. Sebagai                   hedging transactions. As a SOE, the approved
         salah satu BUMN, kebijakan manajemen yang                    management policy is very important in order to
         telah disetujui menjadi sangat penting agar                  avoid any issues that may arise during the
         tidak timbul masalah pada waktu pelaksanaan                  implementation of such hedging programs. All
         akuntansi lindung nilai tersebut. Seluruh                    derivative instruments are recognised in the
         instrumen derivatif dicatat dalam laporan posisi             consolidated statement of financial position at
         keuangan konsolidasian berdasarkan nilai                     their fair values. Fair value is determined based
         wajarnya. Nilai wajar tersebut ditentukan                    on market value using the Bloomberg rate at the
         berdasarkan         harga      pasar      dengan             reporting date. Derivative assets or liabilities are
         menggunakan kurs Bloomberg pada tanggal                      presented as the amount of unrealised gain or
         laporan. Aset dan liabilitas derivatif disajikan             loss from derivative contracts. The Group’s
         sebesar keuntungan maupun kerugian yang                      derivative contracts are classified as financial
         belum direalisasi dari kontrak derivatif. Kontrak            assets measured at FVTPL. These transactions
         derivatif Grup diklasifikasikan sebagai aset                 are solely intended for mitigating foreign
         keuangan yang diukur pada FVTPL. Transaksi                   exchange risk, not for trading and ensuring the
         ini semata-mata dimaksudkan untuk memitigasi                 availability of foreign currency liquidity for
         risiko nilai tukar, tidak untuk diperdagangkan,              principal and interest payments due in the 1-3
         dan memastikan ketersediaan likuiditas valas                 months of the Group’s reporting period. Refer to
         untuk pembayaran sebagian kewajiban valas                    Note 3 for the accounting policy of financial
         yang jatuh tempo dalam jangka waktu 1-3 bulan                assets and liabilities for the financial instruments
         pada periode pelaporan Grup. Lihat Catatan 3                 classification. The Group does not apply hedge
         untuk kebijakan akuntansi untuk aset keuangan                accounting on those transactions.
         dan liabilitas keuangan untuk klasifikasi
         instrumen keuangan. Grup tidak menerapkan
         akuntansi lindung nilai atas transaksi-transaksi
         tersebut.

         Risiko pasar                                                 Market risk

         Manajemen risiko mata uang asing                             Foreign currency risk management

         Grup memiliki banyak transaksi dan sumber                    The Group undertakes many transactions and
         pendanaan dalam mata uang asing. Sebagai                     funding sources denominated in foreign
         akibatnya timbul eksposur terhadap fluktuasi                 currencies. Consequently, there are exposures to
         nilai tukar mata uang asing.                                 exchange rate fluctuations.

         Grup telah melakukan diskusi dengan Bank                     The Group holds regular discussions with Bank
         Indonesia    (“BI”)   untuk    mendapatkan                   Indonesia (“BI") to get a comprehensive
         pemahaman komprehensif atas keadaan                          understanding of the market outlook. The Group
         pasar.      Grup        kemudian         akan                then incorporates this outlook into its internal
         mempertimbangkan keadaan pasar ke dalam                      financial forecasts and develops a concerted
         proyeksi keuangan internal mereka dan                        strategy to mitigate its foreign currency exposure
         mengembangkan strategi yang telah disetujui                  by purchasing the required foreign currency
         bersama untuk memitigasi eksposur risiko mata                denominated instruments at the right time.
         uang asing dengan membeli instrumen mata
         uang asing yang dibutuhkan disaat yang tepat.

         Jumlah eksposur mata uang asing bersih Grup                  The Group’s foreign currency exposure as at the
         pada tanggal pelaporan diungkapkan dalam                     reporting date is disclosed in Note 52.
         Catatan 52.
Page 187
                     PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                  DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                            Lampiran 5/177 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                         NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                           JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                       (Expressed in millions of Rupiah, unless otherwise stated)

55. INSTRUMEN KEUANGAN, MANAJEMEN RISIKO                                      55. FINANCIAL INSTRUMENTS, FINANCIAL RISK
    KEUANGAN    DAN  MANAJEMEN   MODAL                                            AND CAPITAL MANAGEMENT (continued)
    (lanjutan)

    c.   Tujuan dan kebijakan manajemen risiko                                         c.   Financial risk management objectives and
         keuangan (lanjutan)                                                                policies (continued)

         Risiko pasar                                                                       Market risk

         Sensitivitas mata uang asing                                                       Foreign currency sensitivity

         Tabel di bawah ini memaparkan rincian                                              The following table explains the details of the
         sensitivitas Grup untuk setiap 10% kenaikan                                        Group’s sensitivity to a 10% increase and
         dan penurunan Rupiah terhadap mata uang                                            decrease in Rupiah against the relevant foreign
         asing yang relevan. Kenaikan dan penurunan                                         currencies. This 10% increase or decrease
         10% menggambarkan penilaian manajemen                                              represents management’s assessment of the
         terhadap perubahan yang rasional pada nilai                                        reasonably possible changes in foreign currency
         tukar dengan mempertimbangkan kondisi                                              rates considering the current economic
         ekonomi saat ini. Analisis sensitivitas ini                                        conditions. The sensitivity analysis includes after
         mencakup saldo item moneter setelah pajak                                          tax outstanding foreign denominated monetary
         dalam mata uang asing dan menyesuaikan                                             items and adjusts their translation at the end of
         translasi pada akhir tahun untuk 10%                                               the year for a 10% change in foreign currency
         perubahan dalam nilai tukar mata uang asing.                                       rates.

         Tabel di bawah ini memaparkan rincian                                              The following table explains the details of the
         sensitivitas Grup untuk setiap 10% kenaikan                                        Group’s sensitivity to a 10% increase and
         dan penurunan Rupiah terhadap mata uang                                            decrease in Rupiah against the relevant foreign
         asing yang relevan. Kenaikan dan penurunan                                         currencies. This 10% increase or decrease
         10% menggambarkan penilaian manajemen                                              represents management’s assessment of the
         terhadap perubahan yang rasional pada nilai                                        reasonably possible changes in foreign currency
         tukar dengan mempertimbangkan kondisi                                              rates considering the current economic
         ekonomi saat ini. Analisis sensitivitas ini                                        conditions. The sensitivity analysis includes after
         mencakup saldo item moneter setelah pajak                                          tax outstanding foreign denominated monetary
         dalam mata uang asing dan menyesuaikan                                             items and adjusts their translation at the end of
         translasi pada akhir tahun untuk 10%                                               the year for a 10% change in foreign currency
         perubahan dalam nilai tukar mata uang asing.                                       rates.


                                                                   Dampak terhadap laba setelah pajak/
                                                                       Effect to profit after tax*)
                                                                         30 Juni/June 30, 2025
                                              USD                       JPY                         EUR                   Lain-lain/Others**)
                                       10%           -10%          10%         -10%             10%     -10%               10%        -10%
         Aset keuangan                                                                                                                                     Financial assets
                                                                                                                                                     Receivables from related
         Piutang pihak berelasi          88,786       (88,786)         -           -              -              -           -            -                           parties
         Rekening dan deposito
         Berjangka dibatasi                                                                                                                      Restricted cash in banks and
         penggunaannya                   81,592       (81,592)    192,166     (192,166)         -                -           -            -                      time deposits
         Kas dan setara kas             429,758      (429,758)     34,956      (34,956)       7,074           (7,074)     14,550      (14,550)    Cash and cash equivalents
         Investasi jangka pendek              9            (9)                                                                                          Short term investment
         Jumlah aset keuangan           600,145      (600,145)    227,122     (227,122)       7,074           (7,074)     14,550      (14,550)         Total financial assets




         *)    Tidak memperhitungkan efek atas kapitalisasi biaya pinjaman                  *)        Not considering the effect of borrowing cost capitalisation
         **)   Mata uang asing lainnya disajikan dalam jumlah setara USD                    **)       Other foreign currencies are presented as USD equivalent using the
               menggunakan kurs tanggal pelaporan                                                     exchange rates prevailing at reporting date
Page 188
                     PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                  DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                               Lampiran 5/178 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                              NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                     FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                                JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                            (Expressed in millions of Rupiah, unless otherwise stated)


55. INSTRUMEN KEUANGAN, MANAJEMEN RISIKO                                          55. FINANCIAL INSTRUMENTS, FINANCIAL RISK
    KEUANGAN    DAN  MANAJEMEN   MODAL                                                AND CAPITAL MANAGEMENT (continued)
    (lanjutan)

    c.   Tujuan dan kebijakan manajemen risiko                                               c.      Financial risk management objectives and
         keuangan (lanjutan)                                                                         policies (continued)

         Risiko pasar (lanjutan)                                                                     Market risk (continued)

         Sensitivitas mata uang asing (lanjutan)                                                     Foreign currency sensitivity (continued)

         Tabel di bawah ini memaparkan rincian                                                       The following table explains the details of the
         sensitivitas Grup untuk setiap 10% kenaikan                                                 Group’s sensitivity to a 10% increase and
         dan penurunan Rupiah terhadap mata uang                                                     decrease in Rupiah against the relevant foreign
         asing yang relevan. Kenaikan dan penurunan                                                  currencies. This 10% increase or decrease
         10% menggambarkan penilaian manajemen                                                       represents management’s assessment of the
         terhadap perubahan yang rasional pada nilai                                                 reasonably possible changes in foreign currency
         tukar dengan mempertimbangkan kondisi                                                       rates considering the current economic
         ekonomi saat ini. Analisis sensitivitas ini                                                 conditions. The sensitivity analysis includes after
         mencakup saldo item moneter setelah pajak                                                   tax outstanding foreign denominated monetary
         dalam mata uang asing dan menyesuaikan                                                      items and adjusts their translation at the end of
         translasi pada akhir tahun untuk 10%                                                        the year for a 10% change in foreign currency
         perubahan dalam nilai tukar mata uang asing.                                                rates. (continued)
         (lanjutan)
                                                                     Dampak terhadap laba setelah pajak/
                                                                         Effect to profit after tax*)
                                                                           30 Juni/June 30, 2025
                                                USD                       JPY                         EUR                    Lain-lain/Others**)
                                        10%             -10%         10%         -10%            10%              -10%        10%         -10%

         Liabilitas keuangan                                                                                                                                 Financial liabilities
         Penerusan pinjaman             (879,260)       879,260    (1,125,728)   1,125,728          (10,498)      10,498         -           -                    Two-step loans
         Utang sewa                      (28,129)        28,129       (92,139)      92,139              -            -           -           -                    Lease liabilities
         Utang bank dan surat utang                                                                                                                Bank loans and medium term
         jangka menengah               (3,556,739)     3,556,739   (1,573,790)   1,573,790        (1,836,618)   1,836,618        -           -                               notes
         Utang obligasi               (12,898,586)    12,898,586       (8,784)       8,784        (1,484,470)   1,484,470        -           -                     Bonds payable
         Utang listrik swasta            (394,551)       394,551          -            -                 -            -          -           -      Electricity purchase payable
         Utang lain-lain                  (76,886)        76,886      (17,549)      17,549           (54,952)      54,952        -           -                    Other payables
         Utang biaya proyek               (27,053)        27,053      (25,757)      25,757            (2,205)       2,205        -           -               Project cost payable
         Utang usaha                   (1,994,184)     1,994,184          -            -              (5,216)       5,216    (75,686)     75,686                  Trade payables
         Biaya masih harus dibayar       (190,625)       190,625      (24,765)      24,765           (32,695)      32,695        -           -                 Accrued expenses
         Jumlah liabilitas keuangan   (20,046,013)    20,046,013   (2,868,512)   2,868,512        (3,426,654)   3,426,654    (75,686)     75,686         Total financial liabilities

         Jumlah - bersih              (19,445,868)    19,445,868   (2,641,390)   2,641,390        (3,419,580)   3,419,580    (61,136)     61,136                         Total-net


         *)    Tidak memperhitungkan efek atas kapitalisasi biaya pinjaman                           *)    Not considering the effect of borrowing cost capitalisation
         **)   Mata uang asing lainnya disajikan dalam jumlah setara USD                             **)   Other foreign currencies are presented as USD equivalent using the
               menggunakan kurs tanggal pelaporan                                                          exchange rates prevailing at reporting date
Page 189
                      PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                   DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                 Lampiran 5/179 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                    NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                           FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                                      JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                  (Expressed in millions of Rupiah, unless otherwise stated)

55. INSTRUMEN KEUANGAN, MANAJEMEN RISIKO                                                 55. FINANCIAL INSTRUMENTS, FINANCIAL RISK
    KEUANGAN    DAN  MANAJEMEN   MODAL                                                       AND CAPITAL MANAGEMENT (continued)
    (lanjutan)

    c.   Tujuan dan kebijakan manajemen risiko                                                  c.     Financial risk management objectives and
         keuangan (lanjutan)                                                                           policies (continued)

         Risiko pasar (lanjutan)                                                                       Market risk (continued)

         Sensitivitas mata uang asing (lanjutan)                                                       Foreign currency sensitivity (continued)
                                                                               Dampak terhadap laba setelah pajak/
                                                                                    Effect to profit after tax*)
                                                                                31 Desember/December 31, 2024
                                            USD                               JPY                            EUR                     Lain-lain/Others**)
                                     10%           -10%          10%              -10%           10%                 -10%            10%           -10%

         Aset keuangan                                                                                                                                              Financial assets
                                                                                                                                                                    Receivables from
         Piutang pihak berelasi        86,202        (86,202)            -                 -                 -               -               -              -        related parties
         Rekening bank dibatasi                                                                                                                                            Restricted
           penggunaannya               79,073        (79,073)     181,703           (181,703)                -               -               -              -         cash in banks
                                                                                                                                                                       Cash and cash
         Kas dan setara kas           834,989       (834,989)      24,678            (24,678)        54,118            (54,118)          2,070         (2,070)           equivalents
         Investasi jangka pendek        1,054         (1,054)           -                  -              -                  -               -              - Short-term investments

         Jumlah aset keuangan       1,001,318     (1,001,318)     206,381           (206,381)        54,118            (54,118)          2,070         (2,070) Total financial assets

         Liabilitas keuangan                                                                                                                                     Financial liabilities
         Penerusan pinjaman          (948,769)      948,769     (1,074,390)        1,074,390         (10,272)           10,272               -              -         Two-step loans
         Utang sewa                   (32,531)       32,531        (90,154)           90,154               -                 0               -              -         Lease liabilities
         Utang bank dan                                                                                                                                                     Bank loans
           surat utang                                                                                                                                                  and medium
           jangka menengah          (3,939,517)    3,939,517    (1,579,441)        1,579,441     (1,702,320)         1,702,320               -              -             term notes
         Utang obligasi dan                                                                                                                                       Bonds payable and
           sukuk ijarah            (12,839,779)   12,839,779        (8,067)            8,067     (1,312,171)         1,312,171               -              -              sukuk ijara
                                                                                                                                                                  Electricity purchase
         Utang listrik swasta         (416,398)      416,398            -                  -               -                 -               -              -               payables
         Utang lain-lain               (62,878)       62,878      (16,107)            16,107         (55,370)           55,370               -              -         Other payables
         Utang biaya proyek            (27,725)       27,725      (28,942)            28,942          (1,966)            1,966                                  Project cost payables
         Utang usaha                (2,025,617)    2,025,617            -                  -               -                 -         (20,482)        20,482         Trade payables
         Biaya masih harus
           dibayar                   (191,263)      191,263       (45,335)            45,335         (14,545)           14,545               -              -      Accrued expenses

         Jumlah liabilitas                                                                                                                                              Total financial
           keuangan                (20,484,477)   20,484,477    (2,842,436)        2,842,436     (3,096,644)         3,096,644         (20,482)        20,482              liabilities

         Jumlah - bersih           (19,483,159)   19,483,159    (2,636,055)        2,636,055     (3,042,526)         3,042,526         (18,412)        18,412              Total - net



         *)    Tidak memperhitungkan efek atas kapitalisasi biaya pinjaman                             *)        Not considering the effect of borrowing cost capitalisation
         **)   Mata uang asing lainnya disajikan dalam jumlah setara USD                               **)       Other foreign currencies are presented as USD equivalent using the
               menggunakan kurs tanggal pelaporan                                                                exchange rates prevailing at reporting date


         Manajemen risiko tingkat suku bunga                                                           Interest rate risk management

         Grup memiliki transaksi pada tingkat suku                                                     The Group has transactions at fixed and floating
         bunga tetap dan tingkat suku bunga                                                            interest rates. Transactions at floating interest
         mengambang. Transaksi dengan tingkat suku                                                     rates are exposed to cash flows interest rate risk.
         bunga mengambang terekspos terhadap risiko                                                    Borrowing issued at fixed rates exposes the
         suku bunga arus kas. Pinjaman yang                                                            Group to fair value interest risk. The Group
         diterbitkan dengan tingkat suku bunga tetap                                                   manages the risk by maintaining an appropriate
         mengekspos Grup dengan risiko suku bunga                                                      mix of fixed and floating rate borrowings.
         nilai wajar. Grup mengelola risiko dengan
         menyeimbangkan porsi pinjaman dengan
         bunga tetap dan bunga mengambang.
Page 190
                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/180 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                            NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                   FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                              JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)          (Expressed in millions of Rupiah, unless otherwise stated)

55. INSTRUMEN KEUANGAN, MANAJEMEN RISIKO                        55. FINANCIAL INSTRUMENTS, FINANCIAL RISK
    KEUANGAN    DAN  MANAJEMEN   MODAL                              AND CAPITAL MANAGEMENT (continued)
    (lanjutan)

    c.   Tujuan dan kebijakan manajemen risiko                        c.    Financial risk management objectives and
         keuangan (lanjutan)                                                policies (continued)

         Risiko pasar (lanjutan)                                            Market risk (continued)

         Sensitivitas tingkat suku bunga                                    Interest rate sensitivity

         Analisis sensitivitas berikut telah ditentukan                     The sensitivity analysis below has been
         berdasarkan eksposur Grup terhadap tingkat                         determined based on the Group’s exposure to
         suku bunga untuk saldo instrumen keuangan                          interest rates for financial instruments after tax
         terutang setelah pajak pada tanggal pelaporan.                     outstanding at the reporting date. The analysis is
         Analisis ini disusun dengan mengasumsikan                          prepared assuming the amount of assets and
         jumlah saldo aset dan liabilitas terutang pada                     liabilities outstanding at the end of the reporting
         akhir tahun pelaporan, terutang sepanjang                          year was outstanding for the whole year. The
         tahun. Analisis sensitivitas ini menggunakan                       sensitivity analysis uses an assumption of a 50
         asumsi kenaikan dan penurunan sebesar 50                           basis point (“bp”) increase and decrease in the
         basis poin (“bp”) pada tingkat bunga yang                          relevant interest rates with all other variables held
         relevan dengan variabel lain dianggap konstan.                     constant. A 50 bp increase or decrease
         Kenaikan dan penurunan sebesar 50 bp                               represents management’s assessment of the
         merupakan      penilaian    manajemen      atas                    reasonably possible change in interest rates after
         kemungkinan perubahan yang rasional                                considering the current economic conditions.
         terhadap       tingkat      bunga       setelah
         mempertimbangkan kondisi ekonomi saat ini
                                                            Dampak terhadap
                                                           laba setelah pajak/
                                                         Effect to profit after tax
                                                          30 Juni/June 30, 2025
                                                    + 50 bp                     - 50 bp
          Aset keuangan                                                                                             Financial assets
          Kas dan setara kas                             181,734                   (181,734)             Cash and cash equivalents
          Rekening bank dan deposito                                                                    Restricted cash in banks and
          berjangka dibatasi penggunaannya                14,303                     (14,303)                           time deposits
          Investasi jangka pendek                          4,903                      (4,903)                 Short-term investments

          Subjumlah laba/(rugi)                           19,206                     (19,206)                 Subtotal income/(loss)

          Liabilitas keuangan                                                                                   Financial liabilities
          Penerusan pinjaman                           (100,598)                     100,598                        Two-step loans
          Utang bank                                   (588,587)                     588,587                              Bank loans
          Subjumlah laba/(rugi)                        (689,185)                     689,185                  Subtotal (loss)/income

          Total (rugi)/laba                            (669,979)                     669,979                    Total (loss)/income

                                                               Dampak terhadap
                                                              laba setelah pajak/
                                                            Effect to profit after tax
                                                       31 Desember/December 31, 2024
                                                          + 50 bp               - 50 bp

         Aset keuangan                                                                                              Financial assets
         Kas dan setara kas                                    239,196             (239,196)             Cash and cash equivalents
         Rekening bank dan deposito berjangka                                                           Restricted cash in banks and
           dibatasi penggunaannya                               13,737              (13,737)                           time deposits
         Investasi jangka pendek                                 3,840               (3,840)                  Short-term investments

         Subjumlah laba/(rugi)                                 256,773             (256,773)                   Subtotal income/(loss)

         Liabilitas keuangan                                                                                     Financial liabilities
         Penerusan pinjaman                                   (101,544)             101,544                          Two-step loans
         Utang bank                                           (613,196)             613,196                              Bank loans

         Subjumlah (rugi)/laba                                (714,740)             714,740                    Subtotal (loss)/income

         Total (rugi)/laba                                    (457,967)             457,967                      Total (loss)/income
Page 191
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                             Lampiran 5/181 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                             FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                        JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)    (Expressed in millions of Rupiah, unless otherwise stated)

55. INSTRUMEN KEUANGAN, MANAJEMEN RISIKO                    55. FINANCIAL INSTRUMENTS, FINANCIAL RISK
    KEUANGAN    DAN  MANAJEMEN   MODAL                          AND CAPITAL MANAGEMENT (continued)
    (lanjutan)

    c.   Tujuan dan kebijakan manajemen risiko                  c.   Financial risk management objectives and
         keuangan (lanjutan)                                         policies (continued)

         Risiko kredit                                               Credit risk

         Risiko kredit mengacu pada risiko bahwa pihak               Credit risk refers to the risk that the counterparties
         ketiga akan gagal dalam memenuhi kewajiban                  will default on their contractual obligations
         kontraktualnya yang mengakibatkan kerugian                  resulting in a loss to the Group. As a company
         bagi Grup. Sebagai perusahaan yang diberikan                that performs a public service obligation on behalf
         kewajiban untuk melayani publik oleh                        of the Government of the Republic of Indonesia,
         Pemerintah     Republik    Indonesia,    Grup               the Group is obliged to serve all customers
         diwajibkan melayani semua pelanggan tanpa                   regardless of the ability to pay. To minimise the
         melihat apakah nantinya akan bisa membayar                  risk of uncollected receivables, the Group collects
         atau tidak. Dalam meminimalkan risiko tidak                 customer security deposits and will terminate the
         tertagihnya piutang, Grup menerapkan uang                   electricity connection to the customer if a
         jaminan pelanggan dan melakukan pemutusan                   customer does not make payment on time after
         sambungan listrik ke pelanggan ditentukan jika              three-months to minimise the Group’s credit risk.
         pelanggan tidak membayar lewat dari tiga                    For cash and cash equivalents, the Group
         bulan untuk meminimalkan risiko kredit. Untuk               maintains accounts with several banks to avoid a
         kas dan setara kas, Grup mengelola rekening                 significant concentration of cash with one
         pada beberapa bank untuk menghindari                        institution.
         konsentrasi kas yang signifikan pada satu
         institusi.

         Nilai tercatat aset keuangan pada laporan                   The carrying amount of financial assets recorded
         keuangan konsolidasian setelah dikurangi                    in the consolidated financial statements, net of
         dengan        penyisihan    untuk      kerugian             any allowance for losses represents the Group’s
         mencerminkan eksposur Grup terhadap risiko                  exposure to credit risk. See Note 55a for details.
         kredit. Lihat Catatan 55a untuk rinciannya.

         Pada tanggal 30 Juni 2025, jumlah maksimum                  As at June 30, 2025, the total maximum exposure
         eksposur     dari   risiko     kredit  adalah               from credit risk was Rp164,679,651 (December
         Rp164.679.651         (Desember         2024:               2024: Rp142,970,526). Credit risk arises from
         Rp142.970.526). Risiko kredit terutama berasal              cash in banks, time deposits, trade receivables,
         dari kas di bank, deposito berjangka, piutang               receivables from the Government, other
         usaha, piutang dari Pemerintah, piutang lain-               receivables, receivables from related parties,
         lain, piutang pihak berelasi, rekening bank                 restricted cash in banks and short-term
         dibatasi penggunaannya, dan investasi jangka                investments.
         pendek.
         Kualitas kredit piutang usaha                               Credit quality of trade receivables

         Grup berkeyakinan bahwa tidak ada risiko                    The Group believes that there is no significant
         kredit kualitas signifikan yang terpusat karena             concentration of credit quality risk because its
         piutang usaha Grup tersebar merata atas                     trade receivables are spread over a large number
         jumlah pelanggan yang besar yang meliputi                   of customers across diverse industries covering
         berbagai jenis pelanggan baik ritel maupun                  various types of customers, both retail and
         industrial yang tersebar di setiap wilayah                  industrial, which are spread across a number of
         geografis. Grup juga melakukan evaluasi kredit              geographic areas. The Group also performs
         berkelanjutan atas piutang usaha secara                     ongoing credit evaluation of its trade receivables.
         berkala. Lihat Catatan 15 untuk rincian umur                See Note 15 for detailed information of the aging
         piutang usaha dan penilaian penurunan nilai                 of trade receivables and impairment assessment
         piutang usaha.                                              of trade receivables.
         Kualitas kredit piutang dari pemerintah                     Credit quality of receivables from the Government
         Grup berkeyakinan bahwa piutang dari                        The Group believes that receivables from the
         pemerintah dapat diterima sepenuhnya dalam                  Government can be fully recovered in time from
         jangka waktu yang telah ditentukan dari                     the Government of the Republic of Indonesia.
         Pemerintah    Republik    Indonesia.  Grup                  The Group believes there is no risk of default by
         berkeyakinan bahwa tidak ada risiko gagal                   the Government.
         bayar oleh Pemerintah.
Page 192
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                             Lampiran 5/182 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                             FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                        JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)    (Expressed in millions of Rupiah, unless otherwise stated)

55. INSTRUMEN KEUANGAN, MANAJEMEN RISIKO                    55. FINANCIAL INSTRUMENTS, FINANCIAL RISK
    KEUANGAN    DAN  MANAJEMEN   MODAL                          AND CAPITAL MANAGEMENT (continued)
    (lanjutan)

    c.   Tujuan dan kebijakan manajemen risiko                  c.   Financial risk management objectives and
         keuangan (lanjutan)                                         policies (continued)

         Risiko kredit (lanjutan)                                    Credit risk (continued)

         Kualitas kredit kas di bank, deposito berjangka             Credit quality of cash in banks, time deposits and
         dan     rekening      bank     yang     dibatasi            restricted cash in banks
         penggunaannya

         Grup menempatkan kas di bank, deposito                      The Group places cash in banks, time deposits
         berjangka dan rekening bank yang dibatasi                   and restricted cash in banks with reputable
         penggunaannya pada bank yang memiliki                       counterparties that have a good credit rating or
         peringkat kredit yang baik. Oleh karena itu,                standing. Consequently, the Group believes that
         Grup berkeyakinan bahwa risiko kredit atas                  the credit risk of such financial assets is minimal.
         aset keuangan ini adalah minimal. Pihak terkait             These counterparties include large financial
         yang dimaksud termasuk institusi keuangan                   institutions and SOEs.
         utama dan BUMN.

         Kualitas kredit piutang lainnya                             Credit quality of other receivables

         Piutang lainnya ditagihkan kepada pihak                     Other receivables are to be collected from the
         berelasi dan karyawan Grup. Oleh karena itu,                Group’s related parties and employees.
         Grup dapat memonitor kolektibilitas piutang-                Therefore, the Group can closely monitor the
         piutang ini dengan seksama. Grup memiliki                   collectability of these receivables. The Group has
         tingkat kolektibilitas yang baik atas piutang-              a good historical collection rate of these financial
         piutang terkait.                                            assets.

         Risiko likuiditas                                           Liquidity risk

         Risiko likuiditas didefinisikan sebagai risiko              Liquidity risk is defined as the risk that the Group
         bahwa Grup akan menghadapi kesulitan dalam                  will encounter difficulty in meeting its obligations
         memenuhi kewajiban terkait dengan liabilitas                associated with financial liabilities that are settled
         keuangan       yang    diselesaikan   dengan                by delivering cash or another financial assets.
         pembayaran kas atau aset keuangan lainnya.                  Ultimate responsibility for liquidity risk
         Tanggung jawab utama manajemen risiko                       management rests with the Board of Directors,
         likuiditas terletak pada Direksi, yang telah                which have built an appropriate liquidity risk
         membangun kerangka manajemen risiko                         management framework for the management of
         likuiditas yang sesuai untuk persyaratan                    the Group’s short, medium and long-term funding
         manajemen likuiditas dan pendanaan jangka                   and liquidity management requirements. The
         pendek, menengah dan panjang Grup. Grup                     Group manages liquidity risk by maintaining
         mengelola risiko likuiditas dengan menjaga                  adequate cash, reserves, banking facilities and
         kecukupan kas, simpanan, fasilitas bank dan                 reserve borrowing facilities by continuously
         cadangan fasilitas pinjaman dengan terus                    monitoring forecast and actual cash flows and
         menerus memonitor perkiraan dan realisasi                   matching the maturity profiles of financial
         arus kas dan mencocokkan profil jatuh tempo                 liabilities.
         liabilitas keuangan.

         Selanjutnya Grup juga memelihara kecukupan                  In addition, the Group maintains an adequate
         dana     dengan     cara  mempertahankan                    amount of cash and cash equivalents and short-
         kecukupan jumlah kas dan setara kas dan                     time investments, which may be readily
         investasi jangka pendek yang mudah                          converted to cash should there be any
         dikonversi menjadi uang tunai ketika                        unforeseen interruption to its cash collections.
         mengalami gangguan yang tak terduga dari
         penagihan kas.
Page 193
                     PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                  DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                       Lampiran 5/183 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                           NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                  FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                             JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                         (Expressed in millions of Rupiah, unless otherwise stated)

55. INSTRUMEN KEUANGAN, MANAJEMEN RISIKO                                       55. FINANCIAL INSTRUMENTS, FINANCIAL RISK
    KEUANGAN    DAN  MANAJEMEN   MODAL                                             AND CAPITAL MANAGEMENT (continued)
    (lanjutan)

    c.   Tujuan dan kebijakan manajemen risiko                                         c.      Financial risk management objectives and
         keuangan (lanjutan)                                                                   policies (continued)

         Risiko likuiditas (lanjutan)                                                          Liquidity risk (continued)

         Tabel dibawah ini menganalisis liabilitas                                             The table below analyses the Group’s financial
         keuangan Grup pada tanggal pelaporan                                                  liabilities at the reporting date into relevant
         berdasarkan kelompok jatuh temponya dari                                              maturity groupings based on the remaining
         sisa periode hingga tanggal jatuh tempo                                               period to the contractual maturity date. The
         kontraktual. Jumlah yang diungkapkan dalam                                            amount disclosed in the table represent
         tabel ini adalah nilai arus kas kontraktual yang                                      contractual undiscounted cash flows including
         tidak didiskonto termasuk estimasi pembayaran                                         estimated interest payments.
         bunga.
                                                                              30 Juni/June 30, 2025
                                                      Lebih dari satu tahun    Lebih dari tiga tahun
                                                        tetapi tidak lebih       tetapi tidak lebih
                                       Kurang dari       dari tiga tahun/         dari lima tahun/
                                       satu tahun/     More than one year      More than three years         Lebih dari
                                        Less than      but not longer than      but not longer than         lima tahun/        Jumlah/
                                        one year           three years               five years         More than five years    Total

         Liabilitas keuangan                                                                                                                             Financial liabilities
         Penerusan pinjaman               3,896,265               9,051,480                 5,369,381           12,641,809       30,958,935                   Two-step loans
         Utang kepada Pemerintah dan                                                                                                            Government and non-bank
           lembaga keuangan                                                                                                                         Government financial
           Pemerintah nonbank               899,161                 601,255                  559,371             1,126,977        3,186,764                institution loans
         Utang sewa                       8,040,702              16,058,315               10,440,612             9,976,945       44,516,575                   Lease liabilities
         Utang bank                      32,223,562              58,735,391               35,048,318            69,242,779      195,250,050                        Bank loans
         Utang obligasi                                                                                                                                       Bonds payable
           dan sukuk ijarah              21,804,917              66,408,264               52,877,754           191,937,783      333,028,718                 and sukuk ijara
         Utang listrik swasta               951,709               2,138,231                1,896,224             1,276,853        6,263,017   Electricity purchase payables
         Utang usaha                     85,155,280                      -                        -                     -        85,155,280                  Trade payables
         Uang jaminan langganan          19,217,448                      -                        -                     -        19,217,448     Customer security deposits
         Utang biaya proyek               1,591,433                      -                        -                     -         1,591,433            Project cost payables
         Biaya masih harus dibayar        9,774,459                      -                        -                     -        13,125,811               Accrued expenses
         Utang lain-lain                 11,887,817                      -                        -                     -        11,887,817                   Other payables

         Jumlah                         195,442,753             152,992,935              106,191,660           286,203,146      740,830,495                             Total


                                                                           31 Desember/December 31, 2024
                                                      Lebih dari satu tahun      Lebih dari tiga tahun
                                                        tetapi tidak lebih         tetapi tidak lebih
                                       Kurang dari       dari tiga tahun/           dari lima tahun/
                                       satu tahun/     More than one year        More than three years      Lebih dari
                                        Less than      but not longer than        but not longer than      lima tahun/         Jumlah/
                                        one year           three years                 five years      More than five years     Total

         Liabilitas keuangan                                                                                                                             Financial liabilities
         Penerusan pinjaman               3,814,371               7,468,012                 5,899,741           13,912,557       31,094,681                   Two-step loans
         Utang kepada Pemerintah dan                                                                                                            Government and non-bank
           lembaga keuangan                                                                                                                         Government financial
           Pemerintah nonbank               923,725               1,014,793                  500,020               (71,881)       2,366,657                institution loans
         Utang sewa                       7,739,552              11,445,741                9,981,224            15,296,782       44,463,299                   Lease liabilities
         Utang bank                      30,285,419              56,846,858               34,509,679            81,274,726      202,916,682                        Bank loans
         Utang obligasi                                                                                                                                       Bonds payable
           dan sukuk ijarah              20,957,277              48,575,049               53,119,965           212,256,583      334,908,874                 and sukuk ijara
         Utang listrik swasta               946,571               1,893,713                1,888,665             1,978,686        6,707,635   Electricity purchase payables
         Utang usaha                     70,697,819                       -                        -                     -       70,697,819                  Trade payables
         Uang jaminan langganan          18,463,585                       -                        -                     -       18,463,585     Customer security deposits
         Utang biaya proyek               1,680,636                       -                        -                     -        1,680,636            Project cost payables
         Biaya masih harus dibayar       10,495,898                       -                        -                     -       10,495,898               Accrued expenses
         Utang lain-lain                 10,925,072                       -                        -                     -       10,925,072                   Other payables

         Jumlah                         176,929,925             127,244,166              105,899,295           324,647,453      734,720,838                             Total


         Manajemen berkeyakinan bahwa tidak terdapat                                           Management believes that there will be no
         masalah likuiditas karena Grup memiliki                                               liquidity issue as the Group has sufficient standby
         cadangan fasilitas kredit yang memadai,                                               credit facilities, government guarantees for
         adanya jaminan Pemerintah untuk pembayaran                                            related debt repayment and subsidy revenue
         utang bank terkait, dan pendapatan subsidi dari                                       from the Government of Indonesia for provision of
         Pemerintah Indonesia atas penyediaan listrik.                                         electricity.
Page 194
                      PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                   DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                            Lampiran 5/184 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                       FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                                                  JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                              (Expressed in millions of Rupiah, unless otherwise stated)

55. INSTRUMEN KEUANGAN, MANAJEMEN RISIKO                                            55. FINANCIAL INSTRUMENTS, FINANCIAL RISK
    KEUANGAN    DAN  MANAJEMEN   MODAL                                                  AND CAPITAL MANAGEMENT (continued)
    (lanjutan)

    d.   Nilai wajar instrumen keuangan                                                    d.   Fair value of financial instruments

         Nilai wajar adalah suatu jumlah dimana suatu                                           The fair value is the amount for which an asset
         aset dapat dipertukarkan atau suatu liabilitas                                         could be exchanged or a liability settled between
         diselesaikan antara pihak yang memahami dan                                            knowledgeable and willing parties in an arm’s
         berkeinginan untuk melakukan transaksi wajar.                                          length transaction.

         Nilai wajar aset dan liabilitas keuangan                                               The fair value of financial assets and liabilities is
         diestimasi untuk keperluan pengakuan,                                                  estimated for recognition and measurement or for
         pengukuran    atau   untuk      keperluan                                              disclosure purposes.
         pengungkapan.

         PSAK No. 113, “Pengukuran Nilai Wajar”,                                                SFAS No. 113, “Fair Value Measurement”,
         mensyaratkan pengungkapan atas pengukuran                                              requires disclosure of fair value measurements
         nilai wajar dengan tingkat hierarki nilai wajar                                        through the following fair value measurement
         sebagai berikut:                                                                       hierarchy:

         -      Harga kuotasian (tidak disesuaikan) dalam                                       -      Quoted prices (unadjusted) in active markets
                pasar aktif untuk aset atau liabilitas yang                                            for identical assets or liabilities (Level 1);
                identik (Tingkat 1);
         -      Input selain harga kuotasian dari pasar yang                                    -      Inputs other than quoted prices included
                termasuk dalam Tingkat 1 yang dapat                                                    within Level 1 that are observable for the
                diobservasi untuk aset atau liabilitas, baik                                           asset or liability, either directly (that is, as
                secara langsung (misalnya harga) atau                                                  prices) or indirectly (that is, derived from
                secara tidak langsung (misalnya turunan                                                prices) (Level 2); and
                dari harga) (Tingkat 2); dan
         -      Input untuk aset atau liabilitas yang bukan                                     -      Inputs for the asset or liability that are not
                berdasarkan data pasar yang dapat                                                      based on observable market data (that is,
                diobservasi (informasi yang tidak dapat                                                unobservable inputs) (Level 3).
                diobservasi) (Tingkat 3).

         Tabel di bawah ini menggambarkan nilai                                                 The table below describes the carrying amount of
         tercatat dan nilai wajar dari liabilitas keuangan                                      the financial liabilities that are not presented by
         yang tidak disajikan Grup pada nilai wajarnya:                                         the Group at fair value:


                                                                 30 Juni/                                   31 Desember/
                                                                 June 30,                                   December 31,
                                                                   2025                                         2024

                                               Nilai tercatat/              Nilai wajar/        Nilai tercatat/            Nilai wajar/
                                                 Carrying                   Fair value            Carrying                 Fair value
                                                  amount                                           amount
             Liabilitas pada biaya                                                                                                             Liabilities at amortised
                perolahan diamortisasi                                                                                                                            cost
             Penerusan pinjaman                   25,794,408                 25,433,139              26,036,940            25,723,442       Government and non-bank
             Utang kepada Pemerintah                                                                                                         Government and non-bank
             dan lembaga keuangan                                                                                                         bank Government financial
             Pemerintah non-bank                   2,526,071                  2,483,154               2,953,450          2,877,609                   institution loans
             Utang obligasi dan sukuk ijarah     201,511,073                190,281,141             199,059,243        213,367,133        Bonds payable and sukuk ijara
             Utang bank                           150,919,650                150,743,795            157,229,662        156,086,088                            Bank loans


         Penerusan pinjaman dan utang bank                                                      Two-step loans and bank loans are financial
         merupakan liabilitas keuangan dengan tingkat                                           liabilities with floating interest rates, thus the
         bunga mengambang, sehingga nilai tercatat                                              carrying amount of the financial liabilities
         setara dengan nilai wajar.                                                             approximate their fair values.
Page 195
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                             Lampiran 5/185 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                       NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                              FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                         JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)     (Expressed in millions of Rupiah, unless otherwise stated)

55. INSTRUMEN KEUANGAN, MANAJEMEN RISIKO                     55. FINANCIAL INSTRUMENTS, FINANCIAL RISK
    KEUANGAN    DAN  MANAJEMEN   MODAL                           AND CAPITAL MANAGEMENT (continued)
    (lanjutan)

    d.   Nilai wajar instrumen keuangan (lanjutan)               d.   Fair value of financial instruments (continued)

         Beberapa pinjaman dengan suku bunga tetap,                   For certain loans with fixed interest rates, the
         nilai tercatat atas liabilitas keuangan tidak                carrying amount of the financial liabilities does not
         menunjukkan nilai wajarnya, sehingga pada                    represent their fair values, thus as at June 30,
         tanggal 30 Juni 2025 dan 31 Desember 2024,                   2025 and December 31, 2024, the fair value of
         nilai wajar atas pinjaman diukur dengan                      loans is measured using discounted cash flows
         mendiskontokan estimasi arus kas masa depan                  based on the interest rate based on credit
         menggunakan suku bunga pasar dengan                          adjusted market interest rates at the reporting
         penyesuaian kredit pada tanggal pelaporan.                   date. The fair values of the above financial
         Nilai wajar instrumen keuangan di atas                       instruments are classified as Level 2 fair values in
         diklasifikasikan sebagai nilai wajar Tingkat 2               the fair value hierarchy.
         dalam hierarki nilai wajar.

         Nilai wajar dari utang obligasi, ditentukan                  The fair value of bonds payable is determined by
         dengan mengacu pada harga kuotasian dalam                    the quoted market price at the reporting date. The
         pasar aktif pada tanggal pelaporan. Nilai wajar              fair values of the bonds payable is classified as
         utang obligasi di atas diklasifikasikan sebagai              Level 1 fair values in the fair value hierarchy.
         nilai wajar Tingkat 1 dalam hierarki nilai wajar.

         Pada tanggal 30 Juni 2025 dan 31 Desember                    As at June 30, 2025 and December 31, 2024, the
         2024, instrumen keuangan derivatif dihitung                  derivative financial instruments are measured
         menggunakan Tingkat 2. Nilai wajar diukur                    using a Level 2 method. The fair value is
         pada nilai tunai estimasi arus kas masa depan                measured as the present value of the estimated
         berdasarkan kurva pendapatan yang dapat                      future cash flows based on observable yield
         diobservasi.                                                 curves.

         Nilai tercatat dari aset dan liabilitas keuangan             The carrying amounts of other financial assets
         lainnya telah berkisar menunjukkan nilai                     and liabilities approximate their fair values due to
         wajarnya karena memiliki sifat jangka pendek                 the short-term nature of the financial instruments.
         dari instrumen keuangannya.

         Untuk tahun-tahun yang berakhir pada tanggal                 For the years ended June 30, 2025 and
         30 Juni 2025 dan 31 Desember 2024, tidak                     December 31, 2024, there were no transfers
         terdapat pengalihan antar tingkat.                           between levels.
Page 196
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                             Lampiran 5/186 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                          NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                 FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                            JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)        (Expressed in millions of Rupiah, unless otherwise stated)

56. INFORMASI TAMBAHAN                                       56. ADDITIONAL INFORMATION
    a.   Penerapan POJK No. 6                                       a.    Implementation of POJK No. 6
         Sejak    1    Januari    2016,    Perusahaan                     Since January 1, 2016, the Company has
         menerapkan secara prospektif POJK No. 6                          implemented POJK No. 6 prospectively for
         untuk transaksi berdasarkan Perjanjian Jual                      transactions based on Power Purchase
         Beli Tenaga Listrik dengan IPP. Dampak                           Agreements with IPPs. The effect of POJK No. 6
         penerapan POJK No. 6 telah disesuaikan ke                        implementation has been accounted for by
         saldo laba 1 Januari 2016 (Catatan 2.a).                         adjustment to retained earnings as at January 1,
                                                                          2016 (Note 2.a).
         Sesuai POJK No. 6, setiap transaksi                              In accordance with POJK No. 6, all transactions
         berdasarkan Perjanjian Jual Beli Tenaga Listrik                  based on Power Purchase Agreements are
         diperlakukan sebagai transaksi jual beli,                        treated as sale and purchase transactions,
         meskipun sebenarnya mengandung substansi                         although containing a substance other than sale
         selain jual beli (Catatan 3.l). Tabel berikut ini                and purchase (Note 3.l). The following tables are
         disajikan sebagai informasi tambahan jika                        presented as additional information on whether
         perjanjian jual beli listrik dianggap mengandung                 PPAs were deemed to contain a lease.
         sewa.
         Tabel di bawah ini mengandung sewa, namun                        The table below contains leases, but has not yet
         belum memperhitungkan dampaknya terhadap                         considered their impact on subsidy and
         perhitungan subsidi dan kompensasi.                              compensation calculations.


                                              Dengan/Under               Dengan/Under
                                               PSAK/SFAS                  PSAK/SFAS
                                                 No.116                     No.116
                                                30 Juni/                 31 Desember/
                                                June 30,                 December 31,
                                                  2025                       2024

          Laporan posisi keuangan                                                                    Interm Consolidated
            konsolidasian interim                                                          statement of financial position

          Aset tidak lancar                                                                               Noncurrent assets
            Aset hak guna                         471,444,453              386,647,958                 Right-of-use assets

          Ekuitas                                                                                                   Equity
            Saldo laba - Tidak ditentukan         (13,464,958)               2,819,908    Retained earnings- Unappropriated
            penggunaannya

          Liabilitas Jangka panjang                                                                       Noncurrent liabilities
            Utang sewa                            571,840,454              480,420,352                      Lease liabilities
            Utang listrik swasta                    3,760,931                4,082,997        Electricity purchase payable
            Liabilitas pajak tangguhan             42,810,649               41,253,240               Deferred tax liabilities

          Liabilitas jangka pendek                                                                           Current liabilities
            Utang usaha                                                                                     Trade payables
               Pihak berelasi                      33,921,304               22,243,249                    Related parties
               Pihak ketiga                        45,227,205               42,482,950                       Third parties
            Biaya masih harus dibayar              14,470,933               15,488,814                   Accrued expenses
            Utang sewa                             22,403,243               21,119,285                      Lease liabilities
            Utang listrik swasta                      596,222                  564,247       Electricity purchase payables
Page 197
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                  Lampiran 5/187 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                             NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                    FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                               JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)           (Expressed in millions of Rupiah, unless otherwise stated)

56. INFORMASI TAMBAHAN (lanjutan)                                  56. ADDITIONAL INFORMATION (continued)
    a.   Penerapan POJK No. 6 (lanjutan)                               a.     Implementation of POJK No. 6 (continued)


                                                  Dengan/Under              Dengan/Under
                                                   PSAK/SFAS                 PSAK/SFAS
                                                     No.116                    No.116
                                                    30 Juni/                  30 Juni/
                                                    June 30,                  June 30,
                                                      2025                      2024

          Laporan laba rugi komprehensif                                                              Consolidated statements of
            konsolidasian                                                                               comprehensive income

          Beban usaha:                                                                                         Operating expenses:
            Bahan bakar                             130,559,032                120,383,294                    Fuel and lubricants
            Pembelian tenaga listrik                    108,601                  6,261,379                   Purchased electricity
            Sewa                                      1,471,036                  1,258,048                               Leases
            Pemeliharaan                             21,474,818                 19,682,016                          Maintenance

          Penyusutan aset hak guna                   11,109,309                  8,792,294       Right-of-use of assets depreciation
          Laba usaha                                 68,946,347                 61,319,483                          Operating profit
          Keuntungan (kerugian) kurs mata
            uang asing - bersih                     (10,668,267)               (35,449,939)    (Loss)/gain on foreign exchange - net
          Beban Keuangan                            (50,923,423)               (44,320,482)                             Finance cost
          (Rugi)/laba sebelum pajak                    8,666,626               (15,131,786)                   (Loss)/profit before tax
          Beban pajak                                (5,128,695)                  1,118,017                            Tax expense
          (Rugi)/Laba tahun berjalan                   3,537,931               (14,013,770)                 Loss)/Profit for the year

          Laporan arus kas konsolidasian                                                                 Consolidated statements
                                                                                                                 of cash flows

          Arus kas dari aktivitas operasi                                                            Cash from operating activities
           Pembayaran kas kepada pemasok           (162,405,339)              (150,589,860)               Cash paid to suppliers
           Kas diperoleh dari aktivitas operasi       11,714,692                 16,191,245        Cash provided from operation
                                                                                                                          activites
           Pembayaran bunga                         (50,946,510)               (42,926,973)                Interest expense paid
          Kas bersih dari aktivitas operasi           31,731,559                 18,486,550         Net cash provided by operating
                                                                                                                            activities
          Arus kas dari aktivitas pendanaan                                                          Cash from financing activities
            Pembayaran utang listrik swasta            (256,857)                  (242,450)       Payment of electricity purchase
                                                                                                                          payable
            Pembayaran utang sewa
            pembiayaan                               (7,902,449)                (5,561,458)            Payment of lease liabilities
          Kas bersih dari aktivitas pendanaan       (21,753,145)               (22,288,650)            Cash from operating activities




    b.   Kontribusi kepada Pemerintah Indonesia                        b.     Contribution to the Government of Indonesia

         Informasi keuangan tambahan menyajikan                               The supplementary financial information presents
         informasi terkait kontribusi Perusahaan kepada                       information related to the Company’s contribution
         Pemerintah Indonesia sesuai dengan Surat                             to the Government of Indonesia as required by
         Edaran      Kementerian       BUMN    Republik                       the Circular Letter of Ministry of SOE of the
         Indonesia No. S-6/DKU.MBU/02/2024. Selama                            Republic       of       Indonesia    No.       S-
         tahun 2024, jumlah kontribusi Perusahaan                             6/DKU.MBU/02/2024.         During   2024,     the
         terkait pendapatan pajak dan Penerimaan                              Company’s contribution related to tax revenue
         Negara Bukan Pajak (“PNBP”) adalah sebagai                           and non-tax state revenue (“PNBP”) are as
         berikut:                                                             follows:
Page 198
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                   Lampiran 5/188 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                             NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                    FINANCIAL STATEMENTS
30 JUNI 2025 dan 31 DESEMBER 2024                                               JUNE 30, 2025 AND DECEMBER 31, 2024
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)           (Expressed in millions of Rupiah, unless otherwise stated)

56. INFORMASI TAMBAHAN (lanjutan)                                   56. ADDITIONAL INFORMATION (continued)

                                                         30 Juni/                31 Desember/
                                                         June 30,                December 31,
                                                           2025                      2024

           Pajak penghasilan                             11,412,825                 20,459,832                      Income Tax
           PPN                                            8,506,278                 22,069,040                              VAT
           Bea meterai                                       20,092                    268,841                       Stamp duty
           Bea masuk                                         10,862                     48,076                       Import duty
           Pajak daerah dan retribusi daerah              4,813,185                 19,320,789        Local taxes and retribution
           PNBP                                              37,695                     73,679                             PNBP


           Jumlah                                        24,800,937                 62,240,257                                  Total


57. REKLASIFIKASI                                                    57. RECLASSIFICATIONS

    Laporan laba rugi Juni 2024 telah direklasifikasi                        The profit and loss June 2024 statements have
    agar konsisten dengan presentasi laporan                                 been reclassified to be consistent with the
    keuangan konsolidasian 2025. Rincian akun-                               presentation of the 2025 consolidated financial
    akun yang direklasifikasi adalah sebagai                                 statements. The details of the accounts being
    berikut:                                                                 reclassified are as follows:

                                         Sebelum           Reklasifikasi/              Setelah
                                       reklasifikasi/     Reclassification          reklasifikasi/
                                          Before                                        After
                                      reclassification                             reclassification
       Laporan       laba      rugi                                                                    Consolidated statement of profit
       konsolidasian                                                                                                              loss
       Beban usaha                                                                                                          Expense
       Jasa borong                         10,402,986              298,837             10,701,823              Compensation income
       Beban usaha lain-lain                5,135,810            (298,837)              4,836,973          Other operating expenses


58. PERISTIWA                  SETELAH         PERIODE              58. EVENTS AFTER REPORTING PERIOD
    PELAPORAN

     (i) Pada tanggal 14 Juli 2025, PT PLN                                   (i) On July 14, 2025, PT PLN (Persero) made a
         (Persero) telah melakukan penyetoran                                    dividend payment for the 2024 fiscal year to
         Dividen Tahun Buku 2024 bagian PT                                       PT Danantara Asset Management (Persero)
         Danantara Asset Management (Persero)                                    (formerly PT Biro Klasifikasi Indonesia
         (d.h. PT Biro Klasifikasi Indonesia                                     (Persero)) in the amount of Rp3,351,352.
         (Persero)) sebesar Rp3.351.352.



59. TANGGUNG JAWAB MANAJEMEN DAN                                      59. MANAGEMENT’S RESPONSIBILITY FOR AND
    PERSETUJUAN    ATAS    LAPORAN                                        APPROVAL    OF   THE CONSOLIDATED
    KEUANGAN KONSOLIDASIAN                                                FINANCIAL STATEMENTS

    Penyusunan dan penyajian wajar laporan                                   The preparation and fair presentation of the
    keuangan konsolidasian merupakan tanggung                                consolidated      financial statements   is    the
    jawab manajemen dan telah disetujui oleh                                 responsibility of the management and the Directors
    Direksi untuk diterbitkan pada tanggal 25 Juli                           have approved them for issuance on July 25, 2025.
    2025.

File

File Open PDF
Source IDX
Size3.29 MB
Published29 Jul 2025
Pages198
Characters1,385,139
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 71 people and organisations named in the text · linked when the evidence is strong

linked person Burhanuddin Abdullah · Komisaris Utama p.15 ×2
linked person Suahasil Nazara · Wakil Komisaris Utama p.15 ×3
linked person Dadan Kusdiana · Komisaris p.15 ×2
linked person Susiwijono Moegiarso p.15
linked person Bambang Eko Suhariyanto p.15
linked person Andi Arief · Komisaris Independen p.15 ×4
linked person Ali Masykur Musa p.15 ×2
linked person Mutanto Juwono p.15 ×4
linked person Darmawan Prasodjo · Direktur Utama p.15 ×2
linked person Sinthya Roesly · Direktur Keuangan p.15 ×2
linked person Hartanto Wibowo p.15 ×2
linked person Yusuf Didi Setiarto p.15 ×2
linked person Adi Priyanto p.15 ×2
linked person Edi Srimulyanti p.15
linked person Edwin Nugraha Putra p.15
linked person Evy Haryadi p.15 ×2
linked person Rizal Calvary Marimbo p.15
linked person Adi Lumakso p.15 ×2
linked person Arsyadany Ghana Akmalaputri · Direktur Distribusi p.15
linked person Suroso Isnandar p.15 ×2
linked person Wiluyo Kusdwiharto p.15
linked person Yazid Fanani · Ketua p.15 ×4
linked person Aminuddin Ma’ruf · Anggota p.15
linked person Tomi Parisianto Wibowo p.15
linked person Alois Wisnuhardana · Sekretaris Perusahaan p.15 ×2
possible org Bursa Efek Indonesia p.12 ×33
unresolved org Ministry of Energy and Public Kementerian Pekerjaan Umum dan Tenaga. p.11
unresolved org Government of the Republic of Indonesia p.11 ×2
unresolved person Sutjipto p.11 ×2
unresolved org PT PLN Listrik Negara p.11
unresolved org PT PLN (Persero) p.11 ×3
unresolved org Minister of Justice p.11
unresolved person Muhammad Hanafi p.11
unresolved org Menteri Hukum dan Hak p.11
unresolved org Menteri p.11
unresolved org Milik Negara p.12
unresolved org PT Haleyora Powerindo p.12 ×2
unresolved org PT Haleyora p.12
unresolved org PT Powerindo p.12
unresolved org PT Haleyora Power p.12
unresolved org Indonesia Stock Exchange p.12 ×33
unresolved org Majapahit Holding B.V. p.14 ×2
unresolved org Pengawas Pasar Modal p.19
unresolved org Bapepam-LK p.19 ×2
unresolved org Bank Indonesia p.26 ×2
unresolved org Ministry of Finance p.29 ×2
unresolved org Ministry of SOEs p.29
unresolved org Minister of Peraturan Menteri Energi dan Sumber Daya p.46
unresolved org Minister of ESDM p.46
unresolved org Pemeriksa p.47
unresolved org Pengawasan Keuangan p.47
unresolved org Direktorat Jenderal Pajak. p.63
unresolved org Directorate General of Taxation. As p.63
unresolved org PT PLN Indonesia Power p.64 ×2
unresolved org PT Artha Daya Coalindo p.64
unresolved org PT Indo Ridlatama Power p.64
unresolved org PT PLN Indonesia p.64
unresolved org PT Suralaya Indo Tenaga p.65
unresolved org PT Putra Suralaya p.65
unresolved org PT PLN Nusantara Power p.65 ×3
unresolved org PT PJB Services p.65
unresolved org PT Mitra Karya p.65
unresolved org PT Prima Power Nusantara p.65
unresolved org PT PLN Nusantara p.65
unresolved org PT Pembangkitan Jawa Bali p.65
unresolved org PT Pembangkitan Jawa p.65
unresolved org PT Prima Layanan Niaga Suku p.65
unresolved org Minister of Keuangan p.155
unresolved org Kementerian Keuangan. p.155
unresolved org Bank Loans Penerusan Pinjaman p.160

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

Other files in this announcement 5

FinancialStatement-2025-II-PPLN.xlsx done
inlineXBRL.zip done
↑↓ select ↵ open ⇧↵ see every result