Skip to content
Back to announcement

20260715_TOBA_Laporan Penggunaan Dana Hasil Penawaran Umum_32112387_lamp1.pdf

Other Text extracted TOBA

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 8

Page 1 OCR 0.915
"pa
&TBS
NaL)
Jakarta, 15 Juli/ July 2026

Nomor/ Number 1 167/TBS/VII/2026
Lampiran/Attachment :1 (satu) berkas / 7 (one) file

Kepada Yth./ 7o.

Kepala Eksekutif Pengawas Pasar Modal
Otoritas Jasa Keuangan

Gedung Sumitro Djojohadikusumo

Jalan Lapangan Banteng No. 2 - 4
Jakarta 10710

Kepada Yth./ 70

Direksi PT Bursa Efek Indonesia
Gedung Bursa Efek Indonesia, Tower |
Jl. Jend. Sudirman Kav 52-53

Jakarta 12190

Perihal : Penyampaian Laporan Realisasi Penggunaan Dana Penawaran Umum
Obligasi Berkelanjutan I TBS Energi Utama Tahap II Tahun 2026
Subject: Submission of the Disclosure Report on the Realization of the Use of Proceeds from Public
Offering of Shelf Registered I TBS Energi Utama Bonds II Year 2026

Dengan hormat,
Dear Sir/Madam,

Dalam rangka memenuhi ketentuan Peraturan Otoritas Jasa Keuangan Nomor 30/POJK.04/2015 tentang
Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum (“POJK 30/2015”), dengan ini kami
sampaikan Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum Obligasi Berkelanjutan I TBS
Energi Utama Tahap II Tahun 2026 sebagai berikut:

In compliance with Financial Services Authority (Otoritas Jasa Keuangan / OJK) Regulation Number
30/POJK.04/2015 concerning the Report on the Realization of the Use of Proceeds from Public Offerings
(C(POJK 30/2015”), the Company hereby submits the Report on the Realization of the Use of Proceeds
Trom the Public Offering of Shelf Registered Bond I TBS Energi Utama Phase II 2026, as follows:

1. Perseroan telah memperoleh dana hasil Penawaran Umum Obligasi Berkelanjutan I TBS Energi Utama

Tahap II Tahun 2026 sejumlah Rp500.000.000.000,- (lima ratus miliar Rupiah). Setelah dikurangi biaya
penawaran umum sebesar Rp6.040.000.000,- (enam miliar empat puluh juta Rupiah), maka hasil
bersih yang didapat Perseroan adalah sebesar Rp493.960.000.000,- (empat ratus sembilan puluh tiga
miliar sembilan ratus enam puluh juta Rupiah).
The Company has received proceeds from the Public Offering of Shelf Registered Bond I TBS Energi
Utama Phase II Year 2026 amounting to IDR500,000,000,000 (five hundred billion Rupiah). After
deducting public offering expenses of IDR6,040,000,000 (six billion forty million Rupiah), the net
proceeds received by the Company amount to IDR493,960,000,000 (four hundred ninety-three billion
nine hundred sixty million Rupiah).

PT TBS Energi Utama Tbk
Treasury Tower Level 33, District 8, SCBD Lot 28, Jl. Jend. Sudirman Kav 52-53, Jakarta 12190, Indonesia
T 462215020 0353 | F 462215020 0352 | corsec@thisistbs.com | thisistbs.com
Page 2 OCR 0.933
PN
$TBS
h-v4
2. Sebagaimana disebutkan dalam Prospektus, dana hasil Penawaran Umum Obligasi Berkelanjutan | TBS

Energi Utama Tahap II Tahun 2026 akan digunakan untuk:

a. Sebesar Rp400.930.000.000,- (empat ratus miliar sembilan ratus tiga puluh juta Rupiah) akan
digunakan Perseroan untuk melunasi pokok Obligasi | TBS Energi Utama Tahun 2023 Seri A
(“Obligasi 1").

b. Sebesar Rp46.390.000.000,- (empat puluh enam miliar tiga ratus sembilan puluh juta Rupiah)
sebagai setoran modal kepada PT Trisensa Mineral Utama (“TMU"), yang sahamnya dimiliki
secara langsung oleh Perseroan sebesar 99,9996, yang akan digunakan oleh TMU sebagai modal
kerja pertambangan batubara termasuk namun tidak terbatas pada biaya jasa kontraktor
pengupasan lapisan penutup, pengambilan, dan pengangkutan batubara kepada kontraktor jasa
pertambahangan yaitu CV Multindo Prima Teknik ("MPT"). TMU dan MPT telah bekerjasama sejak
ditandatanganinya Perjanjian Jasa Pertambangan pada 1 Februari 2024. Perseroan secara grup
tidak memiliki hubungan afiliasi dengan kontraktor jasa pertambangan MPT.

C. Sisanya digunakan Perseroan sebagai modal kerja Perseroan, termasuk namun tidak terbatas
pada beban operasional rutin seperti beban gaji, beban sewa kantor, perawatan dan perbaikan
kantor, serta keperluan umum korporasi (general corporate purposes) seiring dengan kebutuhan
Perseroan.

As disclosed in the Prospectus, the proceeds obtained from the Public Offering of Shelf Registered

Bond I TBS Energi Utama Phase II Year 2026 shall be utilized as follows:

a. Inamount of IDR 400.930.000.000 (four hundred billion nine hundred thirty million Rupiah) will be
used by the Company for repayment of the principal amount of TBS Energi Utama Bond 1 2023
Serie A (“Bond 1”).

b. In amount of IDR 46,390,000,000 (forty-six billion three hundred ninety million Rupiah) will be
used as capital contribution to PT Trisensa Mineral Utama ("TMU"), which is 99.9946 directly owned
by the Company, to be used by TMU as working capital for coal mining, including but not limited to
Overburden removal, extraction, and hauling contractor service fees payable to the mining services
contractor, CV Multindo Prima Teknik (“(MPT"). TMU and MPT have been in a business partnership
since the signing of the Mining Services Agreement on 1 February 2024. The Company and its
group have no affiliated relationship with mining services contractor MPT.

c. The remaining amount will be used for the Company's working capital, including but not limited to
routine operating expenses such as salaries, office rental expenses, office maintenance and repair
expenses, as well as general corporate purposes, in line with the Company's operational needs.

3. Per tanggal 30 Juni 2026, Perseroan telah menggunakan sebagian dana hasil Penawaran Umum
Obligasi Berkelanjutan | TBS Energi Utama Tahap II Tahun 2026 sebesar Rp447.570.000.000 (empat
ratus empat puluh tujuh miliar lima ratus tujuh puluh juta Rupiah), dengan penjelasan sebagai berikut:
a. Bahwa pelunasan pokok Obligasi | senilai Rp400.930.000.000,- (empat ratus miliar sembilan ratus

tiga puluh juta Rupiah) telah dilakukan pada 13 Februari 2026.

b. Bahwa dana sebesar Rp46.640.000.000,- telah digunakan sebagai modal kerja Perseroan,
termasuk namun tidak terbatas pada beban operasional rutin seperti beban gaji, beban sewa
kantor, perawatan dan perbaikan kantor, serta keperluan umum korporasi (general corporate
purposes).

As of 30 June 2026, the Company has utilized part of the proceeds from the Public Offering of Shelf

Registered Bond I TBS Energi Utama Phase II Year 2026 amounting to IDR447,570,000,000 (four

hundred forty-seven billion five hundred seventy million Rupiah), with the following explanation:

a. That repayment of the principal amount of Bond I amounting to IDR 400,930,000,000 (four
hundred billion nine hundred thirty million Rupiah) has been made on 13 February 2026.

PT TBS Energi Utama Tbk
Treasury Tower Level 33, District 8, SCBD Lot 28, Jl. Jend. Sudirman Kav 52-53, Jakarta 12190, Indonesia
T #6221 5020 0353 | F #6221 5020 0352 | corsec@thisistbs.com | thisistbs.com
Page 3 OCR 0.903
npa
$TBS
h 4
b. Thatan amountof IDR46,640,000,000 (forty-six billion six hundred forty million Rupiah) has been
used for the Company's working capital, including but not limited to routine operating expenses

such as salaries, office rental expenses, office maintenance and repair expenses, as well as general
corporate purposes.

Untuk memenuhi ketentuan Pasal 4 POJK 30/2015, terlampir kami sampaikan detail informasi terkait
Laporan Realisasi Penawaran Umum Obligasi Berkelanjutan I TBS Energi Utama Tahap II Tahun 2026.

In order to comply with Article 4 POJK 30/2015, we hereby enclosed detailed information regarding the
Report on the Realization of the Use of Proceeds from the Public Offering of Shelf Registered Bond I TBS

Energi Utama Bonds Phase II Year 2026.

Hormat kami,
Yours faithfully,
PT TBS Energi Utama Tbk

en ara
& Alvih-£irman Sunanda i Oktarina
Dirdktur/ Director Direktur/ Director

PT TBS Energi Utama Tbk
Treasury Tower Level 33, District 8, SCBD Lot 28, Jl. Jend. Sudirman Kav 52-53, Jakarta 12190, Indonesia

T #6221 5020 0353 | F 462215020 0352 | corsec@thisistbs.com | thisistbs.com
Page 4 OCR 0.302
WOD/Sg1SISIW | WoorsghsIsIU1@)eS102 | 2GEO 0208 12294 4 | £580 0209 I229t.L
PISAUOPU| 'OGLZL PUBMET "EG-ZG AEY UELUIPNS "PUAF “Ir 'BZ IOT ABIS 'BIOLSIG '££ II mo| Ainseo1j,

XGL ewe3n IS40UI SILId
sestojdwg
1 suouney
: 10010 si yvemeheey | oov's | opgordu 960616 Op99pdul
epeday
vesekeguag
Pr
Jo spasu
Ievoge1odo
@11 01 bupuoooe| 1 spuog
persnipe g jum czo2 | Jpesssay
suonpafuy je1de) | sung (4 PUS40 buueyo
- yeyesn xeuel 960b'6 065 9rdu " # Kot'6 oec'grdu Jogeserdu | ovorodu | ooooosdy og yazoz| A7 11 deyeL | 4
ep feuorseiado) enpepe | tueantuejorag
ueynyngoyi| " 128190 Wnwn
vebuap| vesemeuag
ueyerensasip)
ueye eioy
jepow wesoyos
anyns pue
suoneB9O
$ Jo woukeg P . $ "
100'0 yanans uep | 02118 0£6-00bdu ROZ'18 0£6'00rdy
Ise6yao see
vesefegwag
T & & 1 (on 3 8 z 8 s , Ba z D
Bunajjo Burajo
aan Buuoyo Guneyyo ayanes
aya 10 Sarang Ou3 ayang oya su 30
spassolg wwoy our1 | y0 spsesoig 10 sp29019 pascol
aya 00 3uaworeis aya yo ou3.30 1509 1301
Beruadiag reoueurg | aberuoosog OBeruaosag spessosa| souenssi| — yunwn
sposdola INA USEH Ivebuenay| yng useH 1nd son| — yunun| vesemeuog
10 e81 aya sezom| depeysa| tero1| urioge1| — depeusor re3o1 Jusen depewsor ye101 vesemeuag usey
Yoy ounouni | juebuesoray| oserasiog nerot| werep sog| oseruosiag nerox| —aseruasing nero1 ekea| — yetumr
peroodxg ag (eorano orang
yeuea Buseyo sp922019 Bunayyo onang |onuseya |40 20x1 jumun
veeun6Buag Arang aya J0 Spo02019 burusury spa2s01 40 os7 peuueid yeuea| ova wo speoso1g pezyeay sumwn| yunasa| —— uesemeuag
MeM 3oGue | Junwn ursemeuod IseH sueg esis | pazyesy /eueg veeunGBuag Weeun6Buag eurduoy us1emeuod jiseH Isesijeoy teIN | je6Bue1 stuor Jon

Geoe @unr OE 40 SY /9ZOC IUNr O£ Jd
491 Puse1) 1D10UT SJL Id PAAL EWEIN (6103 SAL Ld
SP2OIOIJ JO OSN) OA 4O UONPZPO1 O41 UO JOdoH /WNWN UBJEMBUSd |ISEH BUEG ueeund5uad IsesIjeOH UsJodey

Womu GI Ui perezs year dy Wejep uesilesip)

SaL£
Page 5 OCR 0.345
Woo sgpsisILi | WOosgsISIUy@O8S102 | 2GE0 0209 12294 4 | ESEG 0208 IzC9t L
BISOUOPUI '06IZL EMEYEF "£G-ZG ABM UELulpNS "PUer “Ir 'BZ 101 ABOS 'B IOLISIG '£S lene1 IMO Ainseai|
Ma Ewean S20UI SEL Id

Jopang panytonta Joxoayg panyyasia

5 | Ta |
,

MAL EWEJN 1610UJ SAL Ld

SsaLg
Page 6 OCR 0.310
WoD/Sgpsislua | Woo-sa)

II@oesio2 | 2820 0208 Iz9t | £9£0 0208 Iz29t 1
#ISeUOpul 'O6LZI EMEYEF "£9-ZG ABY UELulpNS "PUAF "If 'BZ IOT ABOS 'BIOLISIG ES Iene1 JomoJ finseei|

YGL Curegn 1S10Ug SAL Ld
€
x0zL Opo'9du 12301 NE1OL
9otZ 0 E9odu 1509 29UENSSI 12Y1O /UPI-UIPA BAEIA U
6200 Lag KI83ON /SUEION "
9olt'0 19e adu Jesuno9 12627 /WNYNH URIINSUOM spuog | peloisiboy
4400'0 hi IWP1UNO2OY WINA Nd UEJUNAY seoz eunr | yays 40 bunayo
seay seojnues Bunsodang 000-00sdu os yszoz | ayang y1 deyey
TOYIEM 1E110EI) NEPOW Jeseg Buelunuag eser efeig "p tunr 0£ | uenfuejoy1ag
900 szdg saj bujjas /uejenfuad eSer ekeig D ISESIGO
5040 Ep6 du 923 Juowaobeuey /uselebuajokuod eser eKeig "Gg WIN UBJEMLUSY
190'0 szedu 204 bunjimiapun /ueuweluad eser eAelg '&
@6ejuS33Od 12101
/esEjuasIOg yyelwng 1509 40 she1og /eKeig uelein Mg ae pa aa busoyyO Yana
/WNUN ULIEMBUOG panweya 40 2dM1 /unwin
1503) aJuenss/ /WnWN UBlemeuad eAeig ISeH yejunr 1e65ue| uejemeuag Suar

Woww gi u pereis ye1nr dy wejep uevifesip)

9202 Sunf O£ 40 SY 19202 IUNT O£ Jad
491 Ewean /612UT SEAL Id PA9L EWEIN I6l0UI SOL Ld
1509 @JUENSSI 0 ME12G /WNWIN USJEMBUAJ BAEIG UEIDUIH

SsaL£
Page 7 OCR 0.281
WoosggsisIui | Wo'sg1sisIUI@29s102 | 2G£0 0Z0S 12294 4 | £S20 0209 Izz9t.L
PISSUOPUJ 'OGLZI EMEXE, '€S-ZS APM UELUIPNS "PUAF “Ir '8Z 1O1 AMOS 'B IluSIG '€£ lene1 1emoy Ainseoi|

MIL EWegn B10UI SJL Id
Pas ana aa
n s/uedwog n 5 1 ai shuedwo
xor6 2 : oroorou | ungu xor6 oroovau | Mndueg|
elsa repo ea epon)
jospesu
ang
ag log wornguguog
co 6ups2oe P
pessnfpe ag jum | yo yuswtee
swonootuendeo| acuan spuog
yevesnyeue) ose'opau - 2 2 2 ewean teroum| sx0b6 - - cesar ewe Pr | pouansiboy
bal adas, esussyg esuosuj| sung | #eus10 Buuoo)
voramesan) Sa aretegua bilah tunr O£ | sebyao unwn
apn vesefeguael unsekegwng pada“
sega wrap:
Tomas eror Tas -erozl
puog Sel puog Sa
prwowtedag pwautedos
, | rediound , | | iediouag
woz'ta - 026'0008N | ay yo “Ganti moz' 026100rA | ny pad bana
we Se unye1 Sg1
12620 yoopa| setiao »o1od
ueroteowny uesofeaung
Busoyo Guneyyo|
ang on 40 spoo2014 ang 2x1 10 sp222014
241 01 spee2019 40 osn amea| vonduosog uoyduosag | aya o1 spe2019 10 asn vojaduosea amen| vonduosag Buuoyo
ne| — psduxsag sduwsod | povueg 10 aBe3usieg| #sduyseg neng nsawsoa) yang ows
rumun ussemeuod aa rani sespas201g| — c1ea | Suuoyo ayang
IseH (OI depeyzo1 21) Menen kala) HNSI serog yumun lonyoeyyg |yo 0041 yunwn|
soson| uovenag | eueg uecuntuasi aposoo1g apoooo1 yywpsa | uesmeuag
Ivebuesoroyl — semaal eursuay aseyuansngi Yo asn pazmeoy revea ureunbbuaa sesneou|  cumauay aseruasiog Yo asn pauuera reuwa uecundbusg sucouoy ieobue ser

Wow yg/ UI peres year dy wejep uevifesip)

9202 dunr OE 40 SY 19202 !UNr OE Jd
A91 Pwe3/) 1612UT SJL Id PAGL EWEIN IB10U3 SAL 1d
BuayO HIINA DUR WOL SPOBOOIJ JO 25/) DUA JO UOREZINEOH PUP UE OUR 40 SNEIOI
/WNUL UEJEMBUAJ JISEH BUBG UeeundBuag IsesIjeay Uep BURDUSH URIdPUIH

SaL2
Page 8 OCR 0.310
Woo-sgasisIL | Woosgasislu1@es102 | 2GE0 0208 12294 4 |ES£0 0209 IZ29t.L
PISOUOPUI 'OGLZL EMSNEr '£-CS MEN UELLIPNS "PUAF “Ir 'BZ IOI AGS 'BIOLISIG '££ InS1 Jamoj Ainseo1|.
ML ewegn ifsoug SJL ld

k

1

spuog | poseisiboy
Geog ounf HSUS 40 Buj1O4JO
MAL BISauopu| JM
- KSE'G e 062'9pdu 0€ /sc0z onand 11 dye,
YUEg Ld EPEd Uebunge| jung og 1 Uennfuerayuag

e51gO
Unwn uesemeudg

Kuedi 2»
0 uya 'usvonero mnnanoeksaelLii2 | (porseejususaa Juswadejg sps2014 Paya Buueyjo 2yand
ue6uap uebungny @ ning 1eyGuLL WIEM BGUer 1265ue|

Woyur gi Ur pejeis ye1nr dy wejep uesifesip)

9zoe dunf OE 10 SY 19202 !Unr O£ Jd
A91 PwPIN 1612UT SJL Id MNOL EWEIN 610U3 Sal 1d
Juowadejg SpunJ Bujurewey Jo SIP19G /EULG ESIS Yeyedwauad uejdulH

SaL&

File

File Open PDF
Source IDX
Size0.49 MB
Published15 Jul 2026
Pages8
Characters13,519
Text sourceOCR
OCR confidence0.537

Names mentioned 6 people and organisations named in the text · linked when the evidence is strong

linked org TBS Energi Utama Tbk p.1 ×25
possible org Otoritas Jasa Keuangan p.1 ×3
possible org PT Bursa Efek Indonesia p.1 ×2
unresolved org Financial Services Authority p.1
unresolved org PT Trisensa Mineral Utama p.2 ×2
unresolved person & Alvih-£irman Sunanda i Oktarina · Dirdktur/ Director Direktur/ Director p.3

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result