Back to announcement
20260715_WEGE_Laporan Penggunaan Dana Hasil Penawaran Umum_32112190.pdf
Other Text extracted WEGESource file signed link, expires in 15 minutes
Extracted text 8
Page 1
Go To English Page
Nomor Surat SE.01.00/A.DIR.00046.WEGE/2026
Nama Perusahaan PT Wijaya Karya Bangunan Gedung Tbk.
Kode Emiten WEGE
Lampiran 2
Perihal Laporan Penggunaan Dana Hasil Penawaran Umum
Dana yang diperoleh dari Penawaran Umum IDR
Rencana Realisasi
Jumlah
Biaya Hasil Penggunaa Penggunaa
Hasil
Jenis Penawaran Realisasi n Dana n Dana Sisa Dana
Tanggal Penawaran
Penawaran Nama Emisi Umum Bersih Menurut Menurut (satuan
Efektif Umum
Umum (satuan mata (satuan Prospektus Prospektus mata uang)
(satuan
uang) mata uang) (satuan (satuan
mata uang)
mata uang) mata uang)
20
832.880.000. 23.014.188.3 809.865.811. 809.865.811. 809.865.811.
IPO Saham WEGE November 0
000 60 640 640 640
2017
Penempatan Sisa Dana
Jenis
Kode Nama
Penawaran Penempatan List
Efek
Umum
Sisa Dana Hubungan
Tingkat Bunga/ Jangka Waktu
(satuan mata Penempatan dengan
Bagi Hasil Penyimpanan
IPO Saham WEGE uang) Perusahaan
0 0 % 0 0 Afiliasi
Page 2
Rincian Rencana Penawaran Umum
Jenis
Kode Nama
Penawaran Tanggal Efektif Rencana List
Efek
Umum
Hasil
Realisasi Jumlah
Bersih Uraian (satuan mata Persentase
(satuan mata uang)
uang)
Penyediaan
Ruang pada
Infrastruktur
139.229.780.76 Perkotaan, 139.229.780.76 17,1900005
%
9 Infrastruktur 9 34057617
20 November Sosial, dan
IPO Saham WEGE Bangunan
2017
Kepariwisataan
Investasi alat
produksi
konstruksi dan
pengembangan
80.986.581.164 80.986.581.164 10 %
sistem teknologi
informasi (TC,
RCH, perancah,
dan TI)
589.649.449.70 589.649.449.70 72,8099975
Modal Kerja %
7 7 5859375
Rincian Realisasi Penawaran Umum
Jenis
Kode Nama
Penawaran Tanggal Efektif Realisasi List
Efek
Umum
Hasil
Realisasi Jumlah
Bersih Uraian (satuan mata Persentase
(satuan mata uang)
uang)
Penyediaan
Ruang pada
Infrastruktur
139.229.780.76 Perkotaan, 139.229.780.76 17,190000
%
9 Infrastruktur 9 534057617
Sosial, dan
20 November
IPO Saham WEGE Bangunan
2017
Kepariwisataan
Investasi alat
produksi
konstruksi dan
pengembangan
80.986.581.164 80.986.581.164 10 %
sistem teknologi
informasi (TC,
RCH, perancah,
dan TI)
589.649.449.70 589.649.449.70 72,809997
Modal Kerja %
7 7 55859375
Page 3
Rincian Biaya Penawaran Umum
Jenis Jumlah Jumlah
Tanggal Persenta
Penawaran Kode Efek Hasil Uraian (Satuan Mata
Efektif se
Umum Penawaran Uang)
IPO Saham WEGE 20 November 832.880.000.00a. biaya jasa penjaminan
2017 0 (underwriting fee);
11.448.314.182 1,37 %
b. biaya jasa
penyelenggaraan
5.587.256.604 0,67 %
(management fee);
c. biaya jasa penjualan
(selling fee);
0 0 %
d. biaya jasa profesi
penunjang pasar modal;
1.532.499.996 0,18 %
e. biaya jasa lembaga
penunjang pasar modal;
740.726.665 0,09 %
dan
f. biaya jasa konsultasi
keuangan (financial
2.119.317.426 0,25 %
advisory fee).
g. Biaya lain-lain yang
dapat diatribusikan
1.586.073.487 0,19 %
langsung sebagai biaya
emisi***)
Demikian untuk diketahui.
Hormat Kami,
PT Wijaya Karya Bangunan Gedung Tbk.
Hartanto Karti Raharjo
Direktur Keuangan, Human Capital, Manajemen Risiko
PT Wijaya Karya Bangunan Gedung Tbk.
WIKA Tower II Jl D.I. Panjaitan Kav. 10, Lantai 14-15, Cipinang Cempedak,
Telepon : (021) 8590 8862, Fax : -, www.wikagedung.co.id
Nama Pengirim Hartanto Karti Raharjo
Jabatan Direktur Keuangan, Human Capital, Manajemen Risiko
Tanggal dan Waktu 15-07-2026 17:15
Page 4
Lampiran 1. Surat Pengantar LRPD WG _ Juni 2026.pdf
2. Laporan LRPD WG _ Juni 2026.pdf
Dokumen ini merupakan dokumen resmi PT Wijaya Karya Bangunan Gedung Tbk. yang tidak memerlukan tanda
tangan karena dihasilkan secara elektronik oleh sistem pelaporan elektronik. PT Wijaya Karya Bangunan Gedung
Tbk. bertanggung jawab penuh atas informasi yang tertera didalam dokumen ini.
Page 5
Go To Indonesian Page
Announcement Number SE.01.00/A.DIR.00046.WEGE/2026
Issuer Name PT Wijaya Karya Bangunan Gedung Tbk.
Issuer Code WEGE
Attachment 2
Subject Laporan Penggunaan Dana Hasil Penawaran Umum
Fund received form the public offering IDR
Amount of Plan for use Realized
Proceed Cost of of proceed Use of Fund
Type of Net Remaining
Name of from the Public according to according to
public Listing Date Realization Fund (in
Issuance Public Offering (in the the
offering (in Currency) Currency)
Offering (in Currency) Prospectus Prospectus
Currency) (in Currency) (in Currency)
832,880,000, 23,014,188,3 809,865,811, 809,865,811, 809,865,811,
IPO Saham WEGE 0
000 60 640 640 640
Allocation of Remaining Fund
Type of public Name / Code of
List of allocation
offering Securities
Remaining Fund Interest/Yield Relationship with
Allocation Retention Period
(in Currency) Rate the company
IPO Saham WEGE
0 0 % 0 0 Afiliasi
Page 6
Details of Public Offering Plan
Type of public Name / Code of
Listing date List of plans
offering Securities
Net Realization Amount (in
Description Percentage
(in Currency) Currency)
Penyediaan
Ruang pada
Infrastruktur
139,229,780,76 Perkotaan, 139,229,780,76 17.1900005
%
9 Infrastruktur 9 34057617
Sosial, dan
IPO Saham WEGE Bangunan
Kepariwisataan
Investasi alat
produksi
konstruksi dan
pengembangan
80,986,581,164 80,986,581,164 10 %
sistem teknologi
informasi (TC,
RCH, perancah,
dan TI)
589,649,449,70 589,649,449,70 72.8099975
Modal Kerja %
7 7 5859375
Details of Public Offering Realization
Type of Public Name / Code of
Listing Date Realization Plan
Offering Securities
Net Realization Amount (in
Description Percentage
(in Currency) Currency)
Penyediaan
Ruang pada
Infrastruktur
139,229,780,76 Perkotaan, 139,229,780,76 17.1900005
%
9 Infrastruktur 9 34057617
Sosial, dan
IPO Saham WEGE Bangunan
Kepariwisataan
Investasi alat
produksi
konstruksi dan
pengembangan
80,986,581,164 80,986,581,164 10 %
sistem teknologi
informasi (TC,
RCH, perancah,
dan TI)
589,649,449,70 589,649,449,70 72.8099975
Modal Kerja %
7 7 5859375
Page 7
Details of Cost of Public Offering
Amount of
Type of Public Amount (in Percenta
Securities Code Listing Date Proceed for the Description
Offering Currency) ge
Public Offering
IPO Saham WEGE 832,880,000,00a. Underwriting fee
0
11,448,314,1821.37 %
b. Management fee
5,587,256,604 0.67 %
c. Selling fee
0 0 %
d. Capital Market
Supporting Profession
1,532,499,996 0.18 %
fee
e. Capital Market
Supporting Institution fee
740,726,665 0.09 %
f. Financial advisory fee
2,119,317,426 0.25 %
g. Other fees which can
be directly attributed as
1,586,073,487 0.19 %
securities issuance fees
Thus to be informed accordingly.
Respectfully,
PT Wijaya Karya Bangunan Gedung Tbk.
Hartanto Karti Raharjo
Direktur Keuangan, Human Capital, Manajemen Risiko
PT Wijaya Karya Bangunan Gedung Tbk.
WIKA Tower II Jl D.I. Panjaitan Kav. 10, Lantai 14-15, Cipinang Cempedak,
Phone : (021) 8590 8862, Fax : -, www.wikagedung.co.id
Sender Name Hartanto Karti Raharjo
Function Direktur Keuangan, Human Capital, Manajemen Risiko
Date and Time 15-07-2026 17:15
Page 8
Attachment 1. Surat Pengantar LRPD WG _ Juni 2026.pdf
2. Laporan LRPD WG _ Juni 2026.pdf
This is an official document of PT Wijaya Karya Bangunan Gedung Tbk. that does not require a signature as it was
generated electronically by the electronic reporting system. PT Wijaya Karya Bangunan Gedung Tbk. is fully
responsible for the information contained within this document.
Names mentioned 4 people and organisations named in the text · linked when the evidence is strong
unresolved
org
Wijaya Karya Bangunan
· Nama Perusahaan
p.1 ×21
unresolved
person
Function
· Direktur
p.7
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
No extraction attempted yet.