 Nomor Surat                           I.103-HGII/2026

 Nama Perusahaan                       PT Hero Global Investment Tbk

 Kode Emiten                           HGII

 Lampiran                              1
                                       Informasi Fakta Material
 Perihal


Dengan ini kami untuk dan atas nama perusahaan menyampaikan Laporan Informasi atau Fakta Material sebagai
berikut:

 Nama Emiten atau Perusahaan Publik            PT Hero Global Investment Tbk

 Bidang Usaha                                  Menjalankan aktivitas perusahaan holding di bidang energi
                                               baru terbarukan


 Telepon                                       (62 21)5227533

 Faksimili                                     (62 21)5250019

 Alamat Surat Elektronik (email)               corporate.secretary@heroglobalinvestment.com


 Tanggal Kejadian                              13 Juli 2026
 Jenis Informasi atau Fakta Material           Informasi Fakta Material
Page 2
Uraian Informasi atau Fakta Material   1. Berdasarkan Prospektus, indikasi timeline penyelenggaraan
                                       Pengadaan Pembelian Tenaga Listrik (PPTL) oleh PT PLN
                                       (Persero) (PLN) untuk proyek SS dan LO ditargetkan
                                       berlangsung pada Semester I dan Semester II tahun 2025,
                                       yang selanjutnya menjadi dasar bagi indikasi penyaluran dana
                                       hasil Penawaran Umum serta pembukaan rekening bank
                                       Project Development Cost Account (PDCA).

                                       2. Sampai dengan tanggal Keterbukaan Informasi ini
                                       disampaikan, PLN belum menerbitkan
                                       undangan/menyelenggarakan proses PPTL untuk diikuti oleh
                                       anak usaha Perseroan, yaitu PT Siantar Sitanduk Energi
                                       (SSE) yang menjalankan proyek SS. Adapun PT Multiprima
                                       Hidro Energi (MHE) yang menjalankan proyek LO sedang
                                       mengikuti proses PPTL yang diselenggarakan PLN di tahun
                                       ini, sehingga penyaluran dana hasil Penawaran Umum belum
                                       dapat dilaksanakan sesuai dengan indikasi timeline yang
                                       tercantum dalam Prospektus.

                                       3. Terdampak dari belum terselenggaranya atau belum
                                       selesainya proses PPTL oleh PLN tersebut, realisasi
                                       penggunaan dana hasil Penawaran Umum yang seharusnya
                                       disalurkan pada Semester I dan/atau Semester II tahun 2025
                                       mengalami penundaan (delay), dan sampai dengan saat ini
                                       belum dapat direalisasikan sesuai dengan rencana
                                       penggunaan dana sebagaimana diungkapkan dalam
                                       Prospektus.

                                       4. Sesuai dengan Prospektus, sepanjang PPTL belum
                                       dimenangkan atau Power Purchase Agreement (PPA) belum
                                       ditandatangani, Perseroan akan menempatkan dana hasil
                                       Penawaran Umum pada instrumen yang aman dan likuid,
                                       seperti rekening bank atau time deposit pada bank yang
                                       kredibel.

                                       5. Perseroan selanjutnya terus memantau perkembangan
                                       proses PPTL dari PLN dan akan menyampaikan Keterbukaan
                                       Informasi lebih lanjut kepada Otoritas Jasa Keuangan (OJK)
                                       dan publik apabila terdapat perkembangan material atas hal
                                       tersebut. Adapun pada saat Keterbukaan Informasi ini dibuat,
                                       penyesuaian target waktu adalah berikut ini,

                                       a. Linimasa Proyek SS
                                       (i) Indikasi penyelesaian penyelenggaraan PPTL oleh PLN
                                       menjadi Semester I Tahun 2027;
                                       (ii) Indikasi penyaluran dana hasil penawaran umum perdana
                                       saham menjadi pada Semester II Tahun 2027;
                                       (iii) Indikasi pembukaan rekening bank PDCA menjadi pada
                                       Semester II Tahun 2027.

                                       b. Linimasa Proyek LO
                                       (i) Indikasi penyelesaian penyelenggaraan PPTL oleh PLN
                                       menjadi Semester II Tahun 2026;
                                       (ii) Indikasi penyaluran dana hasil penawaran umum perdana
                                       saham menjadi pada Semester I Tahun 2027;
                                       (iii) Indikasi pembukaan rekening bank PDCA menjadi pada
                                       Semester I Tahun 2027.
Page 3
Dampak kejadian, informasi atau fakta         a. Terhadap Kegiatan Operasional
material tersebut terhadap kegiatan           Penundaan penyelenggaraan PPTL oleh PLN menyebabkan
operasional, hukum, kondisi keuangan,         tertundanya proses pembangunan pembangkit listrik yang
atau kelangsungan usaha Emiten atau           direncanakan pada proyek SS dan proyek LO, termasuk
Perusahaan Publik                             tahapan pengadaan, konstruksi, dan operasional komersial
                                              (Commercial Operation Date) pembangkit dimaksud. Namun
                                              demikian, penundaan ini tidak mengganggu kegiatan
                                              operasional Perseroan secara keseluruhan yang berjalan saat
                                              ini.

                                              b. Terhadap Aspek Hukum
                                              Tidak terdapat dampak hukum yang material bagi Perseroan,
                                              mengingat penundaan disebabkan oleh belum
                                              terselenggaranya proses PPTL oleh PLN sebagai pihak
                                              eksternal, bukan disebabkan oleh kelalaian atau pelanggaran
                                              ketentuan hukum oleh Perseroan. Perseroan tetap berpegang
                                              pada rencana penggunaan dana sebagaimana diungkapkan
                                              dalam Prospektus dan akan menyesuaikan realisasinya begitu
                                              proses PPTL terlaksana.

                                              c. Terhadap Kondisi Keuangan
                                              Selama dana hasil Penawaran Umum belum disalurkan untuk
                                              keperluan proyek, dana tersebut ditempatkan pada instrumen
                                              keuangan yang aman dan likuid seperti rekening bank/time
                                              deposit, sehingga dana tetap memberikan hasil (yield) bagi
                                              Perseroan dan tidak mengalami penurunan nilai. Kondisi
                                              keuangan Perseroan secara umum tidak terpengaruh secara
                                              material akibat penundaan ini.

                                              d. Terhadap Kelangsungan Usaha
                                              Penundaan ini tidak berdampak signifikan terhadap
                                              kelangsungan usaha (going concern) Perseroan, mengingat
                                              proyek pembangkit listrik dimaksud merupakan salah satu
                                              rencana pengembangan usaha jangka menengah-panjang,
                                              sementara kegiatan usaha utama Perseroan tetap berjalan
                                              lancar. Perseroan selalu berkoordinasi dengan PLN dan
                                              pemangku kepentingan terkait untuk mempercepat proses
                                              PPTL agar rencana penggunaan dana dapat segera
                                              direalisasikan.

Demikian untuk diketahui.


Hormat Kami,
PT Hero Global Investment Tbk




Hugo Feber Parluhutan Silalahi

Direktur




PT Hero Global Investment Tbk
Jl. Setiabudi Tengah No. 22 Kuningan, Setiabudi,
Telepon : (62 21)5227533 , Fax : (62 21)5250019, www.heroglobalinvestment.com



Nama Pengirim                      Hugo Feber Parluhutan Silalahi

Jabatan                            Direktur
Page 4
Tanggal dan Waktu                 15-07-2026 15:36

Lampiran                         1. HGII-Informasi Fakta Material.pdf


  Dokumen ini merupakan dokumen resmi PT Hero Global Investment Tbk yang tidak memerlukan tanda tangan
karena dihasilkan secara elektronik oleh sistem pelaporan elektronik. PT Hero Global Investment Tbk bertanggung
                         jawab penuh atas informasi yang tertera didalam dokumen ini.
Page 5
Go To Indonesian Page

 Letter / Announcement No.           I.103-HGII/2026

 Issuer Name                         PT Hero Global Investment Tbk

 Issuer Code                         HGII

 Attachment                          1

 Subject                             Disclosure of Material Information


The company hereby announce the Material Information or Facts Report as follows

 Name of Issuer or Public Company             PT Hero Global Investment Tbk

 Business Activities                          Menjalankan aktivitas perusahaan holding di bidang energi
                                              baru terbarukan

 Telephone                                    (62 21)5227533

 Faximile                                     (62 21)5250019

 Email Address                                corporate.secretary@heroglobalinvestment.com


 Date of Event                                13 July 2026

                                              Disclosure of Material Information
 Type of Material Information or Facts
Page 6
Description of Material Information or   1. Based on the Prospectus, the indicative timeline for the
Facts                                    Electricity Procurement (Pengadaan Pembelian Tenaga Listrik,
                                         PPTL) to be conducted by PT PLN (Persero)(PLN) for the SS
                                         and LO projects was targeted to take place in Semester I and
                                         Semester II of 2025, which will then become the basis for the
                                         indication of the distribution of funds from the Public Offering
                                         and the opening of a Project Development Cost Account
                                         (PDCA) bank account.

                                         2. As of the date of this Material Information Disclosure, PLN
                                         has not yet invited to, or commenced, the electricity
                                         procurement process for the Company's subsidiary, PT Siantar
                                         Sitanduk Energi (SSE), which is developing the SS Project.
                                         Meanwhile, PT Multiprima Hidro Energi (MHE), which is
                                         developing the LO Project, is currently participating in the
                                         electricity procurement process being conducted by PLN this
                                         year. Accordingly, the utilization of the proceeds from the Initial
                                         Public Offering has not been carried out in accordance with the
                                         indicative timeline set out in the Prospectus.

                                         3. As a result of the PPTL not yet having been conducted or
                                         completed by PLN, the realization of the use of proceeds from
                                         the Public Offering, which was originally scheduled to be used
                                         in the Semester I and/or Semester II of 2025, has been
                                         delayed, and as of the date, has not been realized in
                                         accordance with the plan for the use of funds as disclosed in
                                         the Prospectus.

                                         4. In accordance with the Prospectus, for as long as the PPTL
                                         has not been won or the Power Purchase Agreement (PPA)
                                         has not been signed, the Company will place the proceeds
                                         from the Public Offering in safe and liquid instruments such as
                                         bank accounts or time deposits with a credible bank.

                                         5. The Company will continue to monitor developments in the
                                         PPTL process by PLN and will submit further Information
                                         Disclosures to the Financial Services Authority (Otoritas Jasa
                                         Keuangan, OJK) and the public in the event of any material
                                         developments in this regard. As of the date of this Material
                                         Information Disclosure, the adjustment to the targeted timeline
                                         is as follows:

                                         a. SS Project Timeline
                                         (i) The indicative completion of the Electricity Procurement
                                         (PPTL) arrangement by PLN is expected in the Semester I of
                                         2027;
                                         (ii) The indicative utilization of the proceeds from the Initial
                                         Public Offering is expected in the Semester II of 2027; and
                                         (iii) The indicative opening of the PDCA bank account is
                                         expected in the Semester II of 2027.

                                         b. LO Project Timeline
                                         (i) The indicative completion of the Electricity Procurement
                                         (PPTL) process by PLN is expected in Semester II of 2026;
                                         (ii) The indicative utilization of the proceeds from the Initial
                                         Public Offering is expected in the Semester I of 2027; and
                                         (iii) The indicative opening of the PDCA bank account is
                                         expected in the Semester I of 2027.
Page 7
 Impact of event, material information or       a. Impact on Operational Activities
 facts towards Issuers or Public                The delay in the conduct of the PPTL by PLN has resulted in
 Company’s operational activities, legal,       the postponement of the power plant development process
 financial condition, or going concern          planned by SS Project and LO Project, including the
                                                procurement, construction, and Commercial Operation Date
                                                (COD) stages of the plants in question. Nevertheless, this
                                                delay does not disrupt the Company's overall operational
                                                activities currently in progress.

                                                b. Impact on Legal Aspects
                                                There is no material legal impact on the Company, given that
                                                the delay is caused by the PPTL process not yet having been
                                                conducted by PLN, as an external party, and is not caused by
                                                any negligence or violation of legal provisions on the part of
                                                the Company. The Company continues to hold on to the plan
                                                for the use of funds as disclosed in the Prospectus and will
                                                adjust the realization once the PPTL process has been carried
                                                out.

                                                c. Impact on Financial Condition
                                                For as long as the proceeds from the Public Offering have not
                                                been distributed for project purposes, such funds are placed in
                                                safe and liquid financial instruments, such as bank
                                                accounts/time deposits, so that the funds continue to generate
                                                yield for the Company and do not decrease in value. The
                                                Company's financial condition is generally not materially
                                                affected by this delay.

                                                d. Impact on Business Continuity
                                                This delay does not have a significant impact on the
                                                Company's business continuity (going concern), considering
                                                that the power plant project in question is one of the
                                                Company's medium to long-term business development plans,
                                                while the Company's core business activities continue to run
                                                smoothly. The Company continuously coordinates with PLN
                                                and relevant stakeholders to accelerate the PPTL process so
                                                that the plan for the use of funds can be realized as soon as
                                                possible.

Thus to be informed accordingly.


Respectfully,
PT Hero Global Investment Tbk




Hugo Feber Parluhutan Silalahi

Direktur




PT Hero Global Investment Tbk
Jl. Setiabudi Tengah No. 22 Kuningan, Setiabudi,
Phone : (62 21)5227533 , Fax : (62 21)5250019, www.heroglobalinvestment.com



Sender Name                          Hugo Feber Parluhutan Silalahi

Function                             Direktur

Date and Time                        15-07-2026 15:36
Page 8
Attachment                        1. HGII-Informasi Fakta Material.pdf


This is an official document of PT Hero Global Investment Tbk that does not require a signature as it was generated
    electronically by the electronic reporting system. PT Hero Global Investment Tbk is fully responsible for the
                                      information contained within this document.

File

File Open PDF
Source IDX
Size0.02 MB
Published15 Jul 2026
Pages8
Characters19,954
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 8 people and organisations named in the text · linked when the evidence is strong

linked org Hero Global Investment Tbk · Nama Perusahaan p.1 ×36
possible org Otoritas Jasa Keuangan p.2 ×2
unresolved org PT PLN (Persero) p.2 ×2
unresolved org PT Siantar Sitanduk Energi p.2 ×2
unresolved org PT Multiprima Hidro Energi p.2 ×2
unresolved person Hugo Feber Parluhutan Silalahi · Direktur p.3 ×2
unresolved org Financial Services Authority p.6
unresolved person Function · Direktur p.7

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result