Skip to content
Back to announcement

20250715_BOLD_Laporan Penggunaan Dana Hasil Penawaran Umum_31914982.pdf

Other Text extracted BOLD

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 6

Page 1
Go To English Page

 Nomor Surat                             BUMA/DIR/2025/VII/0645/SKLR.

 Nama Perusahaan                         PT Bukit Makmur Mandiri Utama

 Kode Emiten                             BOLD

 Lampiran                                1

 Perihal                                 Laporan Penggunaan Dana Hasil Penawaran Umum


Dana yang diperoleh dari Penawaran Umum IDR

                                                                                Rencana    Realisasi
                                              Jumlah
                                                            Biaya     Hasil    Penggunaa Penggunaa
                                                Hasil
  Jenis                                                  Penawaran Realisasi     n Dana     n Dana   Sisa Dana
                              Tanggal        Penawaran
Penawaran Nama Emisi                                       Umum       Bersih    Menurut    Menurut    (satuan
                               Efektif         Umum
  Umum                                                  (satuan mata (satuan   Prospektus Prospektus mata uang)
                                              (satuan
                                                            uang)   mata uang)   (satuan    (satuan
                                             mata uang)
                                                                               mata uang) mata uang)
    IPO       Obligasi II    30
                                    1.000.000.00 14.050.000.0 985.950.000. 985.950.000. 985.950.000.
Obligasi/Suk   BUMA       September                                                                            0
                                        0.000         00          000          000          000
     uk      Tahun 2024     2024

Penempatan Sisa Dana

     Jenis
                     Kode Nama
   Penawaran                                                           Penempatan List
                        Efek
     Umum
                                      Sisa Dana                                                           Hubungan
                                                      Tingkat Bunga/                     Jangka Waktu
                      Obligasi II   (satuan mata                        Penempatan                         dengan
      IPO                                                Bagi Hasil                      Penyimpanan
                     BUMA Tahun         uang)                                                            Perusahaan
 Obligasi/Sukuk
                        2024
                                             0            0      %          N/A              N/A         pihak Tiga


Rincian Rencana Penawaran Umum

     Jenis
                     Kode Nama
   Penawaran                        Tanggal Efektif                               Rencana List
                        Efek
     Umum
                                                           Hasil
                                                         Realisasi                           Jumlah
                                                          Bersih           Uraian         (satuan mata   Persentase
                                                       (satuan mata                           uang)
                                                           uang)
                                                                 Belanja modal
                                                      985.950.000.00 (Capital      284.545.000.00 28,8600006
                                                                                                             %
                      Obligasi II                           0     expenditures)          0         10351562
      IPO                           30 September                    alat berat
                     BUMA Tahun
 Obligasi/Sukuk                         2024                       Modal kerja
                        2024
                                                                untuk menunjang
                                                 985.950.000.00                    284.437.000.00 28,8500003
                                                                    kegiatan                                 %
                                                       0                                 0         81469727
                                                                   operasional
                                                                  secara umum
                                                                   Pelunasan
                                                 985.950.000.00 seluruh Obligasi I 416.968.000.00 42,2900009
                                                                                                             %
                                                       0          BUMA Tahun             0         15527344
                                                                      2023
Page 2
Rincian Realisasi Penawaran Umum

    Jenis
                  Kode Nama
  Penawaran                       Tanggal Efektif                              Realisasi List
                     Efek
    Umum
                                                         Hasil
                                                       Realisasi                            Jumlah
                                                        Bersih            Uraian         (satuan mata       Persentase
                                                     (satuan mata                            uang)
                                                         uang)
                                                               Belanja modal
                                                    985.950.000.00 (Capital      284.545.000.00 28,860000
                                                                                                          %
                                                          0     expenditures)          0        610351562
                  Obligasi II
     IPO                          30 September                    alat berat
                 BUMA Tahun
Obligasi/Sukuk                        2024                       Modal kerja
                    2024
                                                              untuk menunjang
                                               985.950.000.00                    284.437.000.00 28,850000
                                                                  kegiatan                                %
                                                     0                                 0        381469727
                                                                 operasional
                                                                secara umum
                                                                 Pelunasan
                                               985.950.000.00 seluruh Obligasi I 416.968.000.00 42,290000
                                                                                                          %
                                                     0          BUMA Tahun             0        915527344
                                                                    2023

Rincian Biaya Penawaran Umum

    Jenis                                              Jumlah                                      Jumlah
                                       Tanggal                                                               Persenta
  Penawaran        Kode Efek                            Hasil                 Uraian            (Satuan Mata
                                        Efektif                                                                 se
    Umum                                              Penawaran                                     Uang)
     IPO       Obligasi II BUMA     30 September 1.000.000.000. a. biaya jasa penjaminan
Obligasi/Sukuk   Tahun 2024             2024          000       (underwriting fee);
                                                                                                1.500.000.000     0,15   %


                                                                     b. biaya jasa
                                                                     penyelenggaraan
                                                                                                4.000.000.000     0,4    %
                                                                     (management fee);

                                                                     c. biaya jasa penjualan
                                                                     (selling fee);
                                                                                                1.500.000.000     0,15   %


                                                                     d. biaya jasa profesi
                                                                     penunjang pasar modal;
                                                                                                5.028.837.154     0,5    %


                                                                     e. biaya jasa lembaga
                                                                     penunjang pasar modal;
                                                                                            1.175.000.000         0,12   %
                                                                     dan

                                                                     f. biaya jasa konsultasi
                                                                     keuangan (financial
                                                                                                        0          0     %
                                                                     advisory fee).

                                                                     g. Biaya lain-lain yang
                                                                     dapat diatribusikan
                                                                                                845.716.667       0,08   %
                                                                     langsung sebagai biaya
                                                                     emisi***)

 Demikian untuk diketahui.


 Hormat Kami,
Page 3
PT Bukit Makmur Mandiri Utama




Samuel Sinaga

Deputy Director




PT Bukit Makmur Mandiri Utama
South Quarter Tower A, Penthouse Floor, Jl. R. A. Kartini Kav. 8, Cilandak Barat,
Telepon : 0216613636, Fax : , https://deltadunia.com/id/tentang-buma/



Nama Pengirim                       Samuel Sinaga

Jabatan                             Deputy Director
Tanggal dan Waktu                   15-07-2025 21:45

Lampiran                           1. BOLD - LRPD 30 June 25 R.02.pdf


  Dokumen ini merupakan dokumen resmi PT Bukit Makmur Mandiri Utama yang tidak memerlukan tanda tangan
karena dihasilkan secara elektronik oleh sistem pelaporan elektronik. PT Bukit Makmur Mandiri Utama bertanggung
                          jawab penuh atas informasi yang tertera didalam dokumen ini.
Page 4
Go To Indonesian Page

 Announcement Number                     BUMA/DIR/2025/VII/0645/SKLR.

 Issuer Name                             PT Bukit Makmur Mandiri Utama

 Issuer Code                             BOLD

 Attachment                              1

 Subject                                 Laporan Penggunaan Dana Hasil Penawaran Umum


Fund received form the public offering            IDR


                                         Amount of                                Plan for use Realized
                                          Proceed      Cost of                     of proceed Use of Fund
   Type of                                                              Net                                  Remaining
                Name of                   from the      Public                   according to according to
    public                  Listing Date                            Realization                               Fund (in
                Issuance                    Public    Offering (in                     the          the
   offering                                                        (in Currency)                             Currency)
                                         Offering (in Currency)                   Prospectus Prospectus
                                         Currency)                               (in Currency) (in Currency)
    IPO       Obligasi II
                                             1,000,000,00 14,050,000,0 985,950,000, 985,950,000, 985,950,000,
Obligasi/Suk   BUMA                                                                                                         0
                                                 0,000         00          000          000          000
     uk      Tahun 2024


Allocation of Remaining Fund


 Type of public Name / Code of
                                                                          List of allocation
    offering      Securities

                                   Remaining Fund Interest/Yield                                                  Relationship with
                     Obligasi II                                             Allocation        Retention Period
      IPO                           (in Currency)      Rate                                                        the company
                    BUMA Tahun
 Obligasi/Sukuk
                       2024
                                              0              0      %           N/A                   N/A            pihak Tiga


Details of Public Offering Plan


 Type of public Name / Code of
                                     Listing date                                     List of plans
    offering      Securities



                                                        Net Realization                           Amount (in
                                                                            Description                              Percentage
                                                         (in Currency)                            Currency)


                                                                        Belanja modal
                                                        985,950,000,00      (Capital      284,545,000,00 28.8600006
                                                                                                                    %
                     Obligasi II                              0          expenditures)          0         10351562
      IPO                                                                  alat berat
                    BUMA Tahun
 Obligasi/Sukuk                                                           Modal kerja
                       2024
                                                                       untuk menunjang
                                                        985,950,000,00                    284,437,000,00 28.8500003
                                                                           kegiatan                                 %
                                                              0                                 0         81469727
                                                                          operasional
                                                                         secara umum
                                                                          Pelunasan
                                                        985,950,000,00 seluruh Obligasi I 416,968,000,00 42.2900009
                                                                                                                    %
                                                              0          BUMA Tahun             0         15527344
                                                                             2023
Page 5
Details of Public Offering Realization


 Type of Public Name / Code of
                                     Listing Date                                  Realization Plan
    Offering      Securities



                                                        Net Realization                        Amount (in
                                                                            Description                          Percentage
                                                         (in Currency)                         Currency)


                                                                        Belanja modal
                                                        985,950,000,00      (Capital      284,545,000,00 28.8600006
                                                                                                                    %
                    Obligasi II                               0          expenditures)          0         10351562
     IPO                                                                   alat berat
                   BUMA Tahun
Obligasi/Sukuk                                                            Modal kerja
                      2024
                                                                       untuk menunjang
                                                        985,950,000,00                    284,437,000,00 28.8500003
                                                                           kegiatan                                 %
                                                              0                                 0         81469727
                                                                          operasional
                                                                         secara umum
                                                                          Pelunasan
                                                        985,950,000,00 seluruh Obligasi I 416,968,000,00 42.2900009
                                                                                                                    %
                                                              0          BUMA Tahun             0         15527344
                                                                             2023

Details of Cost of Public Offering

                                                           Amount of
Type of Public                                                                                          Amount (in   Percenta
                  Securities Code        Listing Date    Proceed for the      Description
   Offering                                                                                             Currency)       ge
                                                         Public Offering
     IPO       Obligasi II BUMA                          1,000,000,000, a. Underwriting fee
Obligasi/Sukuk   Tahun 2024                                   000
                                                                                                       1,500,000,000 0.15       %


                                                                          b. Management fee
                                                                                                       4,000,000,000 0.4        %


                                                                          c. Selling fee
                                                                                                       1,500,000,000 0.15       %


                                                                          d. Capital Market
                                                                          Supporting Profession
                                                                                                       5,028,837,154 0.5        %
                                                                          fee

                                                                          e. Capital Market
                                                                          Supporting Institution fee
                                                                                                       1,175,000,000 0.12       %


                                                                          f. Financial advisory fee
                                                                                                             0       0          %


                                                                          g. Other fees which can
                                                                          be directly attributed as
                                                                                                       845,716,667 0.08         %
                                                                          securities issuance fees


Thus to be informed accordingly.


 Respectfully,
Page 6
PT Bukit Makmur Mandiri Utama




Samuel Sinaga

Deputy Director




PT Bukit Makmur Mandiri Utama
South Quarter Tower A, Penthouse Floor, Jl. R. A. Kartini Kav. 8, Cilandak Barat,
Phone : 0216613636, Fax : , https://deltadunia.com/id/tentang-buma/



Sender Name                         Samuel Sinaga

Function                            Deputy Director

Date and Time                       15-07-2025 21:45

Attachment                         1. BOLD - LRPD 30 June 25 R.02.pdf


     This is an official document of PT Bukit Makmur Mandiri Utama that does not require a signature as it was
 generated electronically by the electronic reporting system. PT Bukit Makmur Mandiri Utama is fully responsible for
                                    the information contained within this document.

File

File Open PDF
Source IDX
Size0.02 MB
Published15 Jul 2025
Pages6
Characters21,987
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 4 people and organisations named in the text · linked when the evidence is strong

linked org PT Bukit Makmur Mandiri Utama · Nama Perusahaan p.1 ×16
unresolved org PT Bukit Makmur Mandiri Utama Samuel Sinaga Deputy p.3 ×2
unresolved org PT Bukit Makmur Mandiri Utama South Quarter Tower p.3 ×2
unresolved — Samuel Sinaga · Deputy Director p.3 ×2

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result