Back to announcement
20250715_BOLD_Laporan Penggunaan Dana Hasil Penawaran Umum_31914934.pdf
Other Text extracted BOLDSource file signed link, expires in 15 minutes
Extracted text 6
Page 1
Go To English Page
Nomor Surat BUMA/DIR/2025/VII/0645/SKLR
Nama Perusahaan PT Bukit Makmur Mandiri Utama
Kode Emiten BOLD
Lampiran 1
Perihal Laporan Penggunaan Dana Hasil Penawaran Umum
Dana yang diperoleh dari Penawaran Umum IDR
Rencana Realisasi
Jumlah
Biaya Hasil Penggunaa Penggunaa
Hasil
Jenis Penawaran Realisasi n Dana n Dana Sisa Dana
Tanggal Penawaran
Penawaran Nama Emisi Umum Bersih Menurut Menurut (satuan
Efektif Umum
Umum (satuan mata (satuan Prospektus Prospektus mata uang)
(satuan
uang) mata uang) (satuan (satuan
mata uang)
mata uang) mata uang)
IPO Obligasi I 29
636.620.000. 13.390.000.0 623.230.000. 623.230.000. 623.230.000.
Obligasi/Suk BUMA Desember 0
000 00 000 000 000
uk Tahun 2023 2023
Penempatan Sisa Dana
Jenis
Kode Nama
Penawaran Penempatan List
Efek
Umum
Sisa Dana Hubungan
Tingkat Bunga/ Jangka Waktu
(satuan mata Penempatan dengan
IPO Obligasi I BUMA Bagi Hasil Penyimpanan
uang) Perusahaan
Obligasi/Sukuk Tahun 2023
0 0 % N/A N/A pihak Tiga
Rincian Rencana Penawaran Umum
Jenis
Kode Nama
Penawaran Tanggal Efektif Rencana List
Efek
Umum
Hasil
Realisasi Jumlah
Bersih Uraian (satuan mata Persentase
(satuan mata uang)
uang)
IPO Obligasi I BUMA 29 Desember Belanja Modal
Obligasi/Sukuk Tahun 2023 2023 623.230.000.00 (Capital 311.615.000.00
50 %
0 Expenditure) Alat 0
Berat
Modal Kerja
623.230.000.00 untuk menunjang 311.615.000.00
50 %
0 kegiatan 0
operasional
Page 2
Rincian Realisasi Penawaran Umum
Jenis
Kode Nama
Penawaran Tanggal Efektif Realisasi List
Efek
Umum
Hasil
Realisasi Jumlah
Bersih Uraian (satuan mata Persentase
(satuan mata uang)
uang)
Belanja Modal
IPO Obligasi I BUMA 29 Desember
623.230.000.00 (Capital 311.615.000.00
Obligasi/Sukuk Tahun 2023 2023 50 %
0 Expenditure) Alat 0
Berat
Modal Kerja
623.230.000.00 untuk menunjang 311.615.000.00
50 %
0 kegiatan 0
operasional
Rincian Biaya Penawaran Umum
Jenis Jumlah Jumlah
Tanggal Persenta
Penawaran Kode Efek Hasil Uraian (Satuan Mata
Efektif se
Umum Penawaran Uang)
IPO Obligasi I BUMA 29 Desember 636.620.000.00a. biaya jasa penjaminan
Obligasi/Sukuk Tahun 2023 2023 0 (underwriting fee);
954.930.000 0,15 %
b. biaya jasa
penyelenggaraan
2.546.480.000 0,4 %
(management fee);
c. biaya jasa penjualan
(selling fee);
954.930.000 0,15 %
d. biaya jasa profesi
penunjang pasar modal;
5.840.197.241 0,92 %
e. biaya jasa lembaga
penunjang pasar modal;
1.999.934.000 0,31 %
dan
f. biaya jasa konsultasi
keuangan (financial
0 0 %
advisory fee).
g. Biaya lain-lain yang
dapat diatribusikan
1.093.800.050 2,1 %
langsung sebagai biaya
emisi***)
Demikian untuk diketahui.
Hormat Kami,
PT Bukit Makmur Mandiri Utama
Samuel Sinaga
Page 3
Deputy Director
PT Bukit Makmur Mandiri Utama
South Quarter Tower A, Penthouse Floor, Jl. R. A. Kartini Kav. 8, Cilandak Barat,
Telepon : 0216613636, Fax : , https://deltadunia.com/id/tentang-buma/
Nama Pengirim Samuel Sinaga
Jabatan Deputy Director
Tanggal dan Waktu 15-07-2025 21:45
Lampiran 1. BOLD - LRPD 30 June 25 R.02.pdf
Dokumen ini merupakan dokumen resmi PT Bukit Makmur Mandiri Utama yang tidak memerlukan tanda tangan
karena dihasilkan secara elektronik oleh sistem pelaporan elektronik. PT Bukit Makmur Mandiri Utama bertanggung
jawab penuh atas informasi yang tertera didalam dokumen ini.
Page 4
Go To Indonesian Page
Announcement Number BUMA/DIR/2025/VII/0645/SKLR
Issuer Name PT Bukit Makmur Mandiri Utama
Issuer Code BOLD
Attachment 1
Subject Laporan Penggunaan Dana Hasil Penawaran Umum
Fund received form the public offering IDR
Amount of Plan for use Realized
Proceed Cost of of proceed Use of Fund
Type of Net Remaining
Name of from the Public according to according to
public Listing Date Realization Fund (in
Issuance Public Offering (in the the
offering (in Currency) Currency)
Offering (in Currency) Prospectus Prospectus
Currency) (in Currency) (in Currency)
IPO Obligasi I
636,620,000, 13,390,000,0 623,230,000, 623,230,000, 623,230,000,
Obligasi/Suk BUMA 0
000 00 000 000 000
uk Tahun 2023
Allocation of Remaining Fund
Type of public Name / Code of
List of allocation
offering Securities
Remaining Fund Interest/Yield Relationship with
Allocation Retention Period
IPO Obligasi I BUMA (in Currency) Rate the company
Obligasi/Sukuk Tahun 2023
0 0 % N/A N/A pihak Tiga
Details of Public Offering Plan
Type of public Name / Code of
Listing date List of plans
offering Securities
Net Realization Amount (in
Description Percentage
(in Currency) Currency)
IPO Obligasi I BUMA Belanja Modal
Obligasi/Sukuk Tahun 2023 623,230,000,00 (Capital 311,615,000,00
50 %
0 Expenditure) Alat 0
Berat
Modal Kerja
623,230,000,00 untuk menunjang 311,615,000,00
50 %
0 kegiatan 0
operasional
Page 5
Details of Public Offering Realization
Type of Public Name / Code of
Listing Date Realization Plan
Offering Securities
Net Realization Amount (in
Description Percentage
(in Currency) Currency)
IPO Obligasi I BUMA Belanja Modal
Obligasi/Sukuk Tahun 2023 623,230,000,00 (Capital 311,615,000,00
50 %
0 Expenditure) Alat 0
Berat
Modal Kerja
623,230,000,00 untuk menunjang 311,615,000,00
50 %
0 kegiatan 0
operasional
Details of Cost of Public Offering
Amount of
Type of Public Amount (in Percenta
Securities Code Listing Date Proceed for the Description
Offering Currency) ge
Public Offering
IPO Obligasi I BUMA 636,620,000,00a. Underwriting fee
Obligasi/Sukuk Tahun 2023 0
954,930,000 0.15 %
b. Management fee
2,546,480,000 0.4 %
c. Selling fee
954,930,000 0.15 %
d. Capital Market
Supporting Profession
5,840,197,241 0.92 %
fee
e. Capital Market
Supporting Institution fee
1,999,934,000 0.31 %
f. Financial advisory fee
0 0 %
g. Other fees which can
be directly attributed as
1,093,800,050 2.1 %
securities issuance fees
Thus to be informed accordingly.
Respectfully,
PT Bukit Makmur Mandiri Utama
Samuel Sinaga
Page 6
Deputy Director
PT Bukit Makmur Mandiri Utama
South Quarter Tower A, Penthouse Floor, Jl. R. A. Kartini Kav. 8, Cilandak Barat,
Phone : 0216613636, Fax : , https://deltadunia.com/id/tentang-buma/
Sender Name Samuel Sinaga
Function Deputy Director
Date and Time 15-07-2025 21:45
Attachment 1. BOLD - LRPD 30 June 25 R.02.pdf
This is an official document of PT Bukit Makmur Mandiri Utama that does not require a signature as it was
generated electronically by the electronic reporting system. PT Bukit Makmur Mandiri Utama is fully responsible for
the information contained within this document.
Names mentioned 4 people and organisations named in the text · linked when the evidence is strong
unresolved
org
PT Bukit Makmur Mandiri Utama Samuel Sinaga
p.2 ×2
unresolved
org
PT Bukit Makmur Mandiri Utama South Quarter Tower
p.3 ×2
unresolved
—
Samuel Sinaga
· Deputy Director
p.3 ×2
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
No extraction attempted yet.