Skip to content
Back to announcement

20250715_BOLD_Laporan Penggunaan Dana Hasil Penawaran Umum_31914934.pdf

Other Text extracted BOLD

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 6

Page 1
Go To English Page

 Nomor Surat                           BUMA/DIR/2025/VII/0645/SKLR

 Nama Perusahaan                       PT Bukit Makmur Mandiri Utama

 Kode Emiten                           BOLD

 Lampiran                              1

 Perihal                               Laporan Penggunaan Dana Hasil Penawaran Umum


Dana yang diperoleh dari Penawaran Umum IDR

                                                                              Rencana    Realisasi
                                            Jumlah
                                                          Biaya     Hasil    Penggunaa Penggunaa
                                              Hasil
  Jenis                                                Penawaran Realisasi     n Dana     n Dana   Sisa Dana
                            Tanggal        Penawaran
Penawaran Nama Emisi                                     Umum       Bersih    Menurut    Menurut    (satuan
                             Efektif         Umum
  Umum                                                (satuan mata (satuan   Prospektus Prospektus mata uang)
                                            (satuan
                                                          uang)   mata uang)   (satuan    (satuan
                                           mata uang)
                                                                             mata uang) mata uang)
    IPO       Obligasi I    29
                                  636.620.000. 13.390.000.0 623.230.000. 623.230.000. 623.230.000.
Obligasi/Suk   BUMA      Desember                                                                             0
                                      000           00          000          000          000
     uk      Tahun 2023    2023

Penempatan Sisa Dana

     Jenis
                     Kode Nama
   Penawaran                                                         Penempatan List
                        Efek
     Umum
                                 Sisa Dana                                                              Hubungan
                                                    Tingkat Bunga/                     Jangka Waktu
                               (satuan mata                           Penempatan                         dengan
      IPO      Obligasi I BUMA                         Bagi Hasil                      Penyimpanan
                                   uang)                                                               Perusahaan
 Obligasi/Sukuk Tahun 2023
                                     0                  0       %         N/A              N/A         pihak Tiga


Rincian Rencana Penawaran Umum

     Jenis
                     Kode Nama
   Penawaran                     Tanggal Efektif                                Rencana List
                        Efek
     Umum
                                                         Hasil
                                                       Realisasi                           Jumlah
                                                        Bersih           Uraian         (satuan mata   Persentase
                                                     (satuan mata                           uang)
                                                         uang)
      IPO      Obligasi I BUMA 29 Desember                          Belanja Modal
 Obligasi/Sukuk Tahun 2023         2023             623.230.000.00      (Capital     311.615.000.00
                                                                                                         50         %
                                                          0        Expenditure) Alat       0
                                                                         Berat
                                                                     Modal Kerja
                                                    623.230.000.00 untuk menunjang 311.615.000.00
                                                                                                         50         %
                                                          0            kegiatan            0
                                                                      operasional
Page 2
Rincian Realisasi Penawaran Umum

    Jenis
                  Kode Nama
  Penawaran                      Tanggal Efektif                             Realisasi List
                     Efek
    Umum
                                                        Hasil
                                                      Realisasi                           Jumlah
                                                       Bersih           Uraian         (satuan mata       Persentase
                                                    (satuan mata                           uang)
                                                        uang)
                                                                   Belanja Modal
     IPO      Obligasi I BUMA 29 Desember
                                                   623.230.000.00      (Capital     311.615.000.00
Obligasi/Sukuk Tahun 2023         2023                                                                     50        %
                                                         0        Expenditure) Alat       0
                                                                        Berat
                                                                    Modal Kerja
                                                   623.230.000.00 untuk menunjang 311.615.000.00
                                                                                                           50        %
                                                         0            kegiatan            0
                                                                     operasional

Rincian Biaya Penawaran Umum

    Jenis                                             Jumlah                                     Jumlah
                                      Tanggal                                                              Persenta
  Penawaran        Kode Efek                           Hasil                Uraian            (Satuan Mata
                                       Efektif                                                                se
    Umum                                             Penawaran                                    Uang)
     IPO       Obligasi I BUMA     29 Desember 636.620.000.00a. biaya jasa penjaminan
Obligasi/Sukuk  Tahun 2023             2023          0       (underwriting fee);
                                                                                              954.930.000       0,15     %


                                                                   b. biaya jasa
                                                                   penyelenggaraan
                                                                                              2.546.480.000     0,4      %
                                                                   (management fee);

                                                                   c. biaya jasa penjualan
                                                                   (selling fee);
                                                                                              954.930.000       0,15     %


                                                                   d. biaya jasa profesi
                                                                   penunjang pasar modal;
                                                                                              5.840.197.241     0,92     %


                                                                   e. biaya jasa lembaga
                                                                   penunjang pasar modal;
                                                                                          1.999.934.000         0,31     %
                                                                   dan

                                                                   f. biaya jasa konsultasi
                                                                   keuangan (financial
                                                                                                      0          0       %
                                                                   advisory fee).

                                                                   g. Biaya lain-lain yang
                                                                   dapat diatribusikan
                                                                                              1.093.800.050     2,1      %
                                                                   langsung sebagai biaya
                                                                   emisi***)

 Demikian untuk diketahui.


 Hormat Kami,
 PT Bukit Makmur Mandiri Utama




 Samuel Sinaga
Page 3
Deputy Director




PT Bukit Makmur Mandiri Utama
South Quarter Tower A, Penthouse Floor, Jl. R. A. Kartini Kav. 8, Cilandak Barat,
Telepon : 0216613636, Fax : , https://deltadunia.com/id/tentang-buma/



Nama Pengirim                       Samuel Sinaga

Jabatan                             Deputy Director
Tanggal dan Waktu                   15-07-2025 21:45

Lampiran                           1. BOLD - LRPD 30 June 25 R.02.pdf


  Dokumen ini merupakan dokumen resmi PT Bukit Makmur Mandiri Utama yang tidak memerlukan tanda tangan
karena dihasilkan secara elektronik oleh sistem pelaporan elektronik. PT Bukit Makmur Mandiri Utama bertanggung
                          jawab penuh atas informasi yang tertera didalam dokumen ini.
Page 4
Go To Indonesian Page

 Announcement Number                     BUMA/DIR/2025/VII/0645/SKLR

 Issuer Name                             PT Bukit Makmur Mandiri Utama

 Issuer Code                             BOLD

 Attachment                              1

 Subject                                 Laporan Penggunaan Dana Hasil Penawaran Umum


Fund received form the public offering            IDR


                                         Amount of                                Plan for use Realized
                                          Proceed      Cost of                     of proceed Use of Fund
   Type of                                                              Net                                  Remaining
                Name of                   from the      Public                   according to according to
    public                  Listing Date                            Realization                               Fund (in
                Issuance                    Public    Offering (in                     the          the
   offering                                                        (in Currency)                             Currency)
                                         Offering (in Currency)                   Prospectus Prospectus
                                         Currency)                               (in Currency) (in Currency)
    IPO       Obligasi I
                                             636,620,000, 13,390,000,0 623,230,000, 623,230,000, 623,230,000,
Obligasi/Suk   BUMA                                                                                                         0
                                                 000           00          000          000          000
     uk      Tahun 2023


Allocation of Remaining Fund


 Type of public Name / Code of
                                                                          List of allocation
    offering      Securities

                              Remaining Fund Interest/Yield                                                       Relationship with
                                                                             Allocation        Retention Period
      IPO      Obligasi I BUMA (in Currency)      Rate                                                             the company
 Obligasi/Sukuk Tahun 2023
                                     0           0        %                     N/A                   N/A            pihak Tiga


Details of Public Offering Plan


 Type of public Name / Code of
                                     Listing date                                     List of plans
    offering      Securities



                                                        Net Realization                           Amount (in
                                                                            Description                              Percentage
                                                         (in Currency)                            Currency)


      IPO      Obligasi I BUMA                                          Belanja Modal
 Obligasi/Sukuk Tahun 2023                              623,230,000,00      (Capital     311,615,000,00
                                                                                                                       50         %
                                                              0        Expenditure) Alat       0
                                                                             Berat
                                                                         Modal Kerja
                                                        623,230,000,00 untuk menunjang 311,615,000,00
                                                                                                                       50         %
                                                              0            kegiatan            0
                                                                          operasional
Page 5
Details of Public Offering Realization


 Type of Public Name / Code of
                                     Listing Date                                  Realization Plan
    Offering      Securities



                                                        Net Realization                        Amount (in
                                                                            Description                          Percentage
                                                         (in Currency)                         Currency)


     IPO      Obligasi I BUMA                                           Belanja Modal
Obligasi/Sukuk Tahun 2023                               623,230,000,00      (Capital     311,615,000,00
                                                                                                                     50        %
                                                              0        Expenditure) Alat       0
                                                                             Berat
                                                                         Modal Kerja
                                                        623,230,000,00 untuk menunjang 311,615,000,00
                                                                                                                     50        %
                                                              0            kegiatan            0
                                                                          operasional

Details of Cost of Public Offering

                                                          Amount of
Type of Public                                                                                          Amount (in        Percenta
                  Securities Code        Listing Date   Proceed for the     Description
   Offering                                                                                             Currency)            ge
                                                        Public Offering
     IPO       Obligasi I BUMA                          636,620,000,00a. Underwriting fee
Obligasi/Sukuk  Tahun 2023                                     0
                                                                                                       954,930,000 0.15              %


                                                                          b. Management fee
                                                                                                       2,546,480,000 0.4             %


                                                                          c. Selling fee
                                                                                                       954,930,000 0.15              %


                                                                          d. Capital Market
                                                                          Supporting Profession
                                                                                                       5,840,197,241 0.92            %
                                                                          fee

                                                                          e. Capital Market
                                                                          Supporting Institution fee
                                                                                                       1,999,934,000 0.31            %


                                                                          f. Financial advisory fee
                                                                                                             0        0              %


                                                                          g. Other fees which can
                                                                          be directly attributed as
                                                                                                    1,093,800,050 2.1                %
                                                                          securities issuance fees


Thus to be informed accordingly.


 Respectfully,
 PT Bukit Makmur Mandiri Utama




 Samuel Sinaga
Page 6
Deputy Director




PT Bukit Makmur Mandiri Utama
South Quarter Tower A, Penthouse Floor, Jl. R. A. Kartini Kav. 8, Cilandak Barat,
Phone : 0216613636, Fax : , https://deltadunia.com/id/tentang-buma/



Sender Name                         Samuel Sinaga

Function                            Deputy Director

Date and Time                       15-07-2025 21:45

Attachment                         1. BOLD - LRPD 30 June 25 R.02.pdf


     This is an official document of PT Bukit Makmur Mandiri Utama that does not require a signature as it was
 generated electronically by the electronic reporting system. PT Bukit Makmur Mandiri Utama is fully responsible for
                                    the information contained within this document.

File

File Open PDF
Source IDX
Size0.02 MB
Published15 Jul 2025
Pages6
Characters18,857
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 4 people and organisations named in the text · linked when the evidence is strong

linked org PT Bukit Makmur Mandiri Utama · Nama Perusahaan p.1 ×16
unresolved org PT Bukit Makmur Mandiri Utama Samuel Sinaga p.2 ×2
unresolved org PT Bukit Makmur Mandiri Utama South Quarter Tower p.3 ×2
unresolved — Samuel Sinaga · Deputy Director p.3 ×2

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result