Skip to content
Back to announcement

20260707_NSSS_Laporan Penggunaan Dana Hasil Penawaran Umum_32109289.pdf

Other Text extracted NSSS

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 24

Page 1
Go To English Page

 Nomor Surat                      064/NSS/SK/VII/2026

 Nama Perusahaan                  PT Nusantara Sawit Sejahtera Tbk

 Kode Emiten                      NSSS

 Lampiran                         2

 Perihal                          Laporan Penggunaan Dana Hasil Penawaran Umum


Dana yang diperoleh dari Penawaran Umum IDR

                                                                          Rencana      Realisasi
                                   Jumlah
                                                  Biaya        Hasil     Penggunaa Penggunaa
                                     Hasil
   Jenis                                       Penawaran Realisasi         n Dana       n Dana    Sisa Dana
                      Tanggal     Penawaran
Penawaran Nama Emisi                             Umum         Bersih      Menurut      Menurut     (satuan
                       Efektif      Umum
  Umum                                        (satuan mata (satuan       Prospektus Prospektus mata uang)
                                   (satuan
                                                  uang)     mata uang)     (satuan      (satuan
                                  mata uang)
                                                                         mata uang) mata uang)
                     28 Februari 453.165.883. 22.652.110.4 430.513.772. 430.513.772. 430.513.772.
IPO Saham   NSSS                                                                                      0
                        2023         100           64          636           636          636
                     28 Februari 453.165.883. 22.652.110.4 430.513.772. 430.513.772. 430.513.772.
IPO Saham   NSSS                                                                                      0
                        2023         100           64          636           636          636

Penempatan Sisa Dana

     Jenis
                     Kode Nama
   Penawaran                                                     Penempatan List
                        Efek
     Umum
                                   Sisa Dana                                                       Hubungan
                                                Tingkat Bunga/                     Jangka Waktu
                                 (satuan mata                     Penempatan                        dengan
                                                   Bagi Hasil                      Penyimpanan
                                     uang)                                                        Perusahaan
  IPO Saham            NSSS
                                      0             0      %           -                -         pihak Tiga

                                      0             0      %           -                -         pihak Tiga



  IPO Saham            NSSS
Page 2
Rincian Rencana Penawaran Umum

    Jenis
               Kode Nama
  Penawaran                 Tanggal Efektif   Rencana List
                  Efek
    Umum
Page 3
  Jenis
            Kode Nama
Penawaran               Tanggal Efektif                           Rencana List
               Efek
  Umum
                                               Hasil
                                             Realisasi                       Jumlah
                                              Bersih          Uraian      (satuan mata     Persentase
                                           (satuan mata                       uang)
                                               uang)
                                                         PT. Borneo Sawit
                                                         Perdana - untuk
                                                         kebutuhan biaya
                                                               belanja
                                                            modal/capital
                                          430.513.772.63                    128.293.104.24 29,7999992
                                                             expenditure                              %
                                                6                                  6        37060547
                                                           (CAPEX) BSP
                                                                dalam
                                                            membangun
                                                           fasilitas pabrik
                                                            kelapa sawit
                                                         PT. Borneo Sawit
                                                         Perdana - untuk
                                                         kebutuhan biaya
                                                               belanja
                                                            modal/capital
                                          430.513.772.63                                   3,20000004
                                                             expenditure    13.776.440.724            %
                                                6                                            7683716
                                                           (CAPEX) BSP
                                                                dalam
                                                            membangun
                                                           pembangunan
                                                          terminal khusus
                                                         PT. Borneo Sawit
                                                         Perdana - untuk
                         28 Februari                         pemenuhan
IPO Saham     NSSS                                       modal kerja BSP
                            2023          430.513.772.63                                   21,0100002
                                                         dalam pembelian 90.468.294.628               %
                                                6                                           28881836
                                                              pupuk dan
                                                            agrochemical
                                                         atau bahan kimia
                                                              pertanian
                                                         PT. Bina Sarana
                                                           Sawit Utama -
                                                                 untuk
                                          430.513.772.63                                   0,92000001
                                                            melanjutkan      3.945.751.000            %
                                                6                                           66893005
                                                               proses
                                                            pembebasan
                                                                 lahan
                                                         PT. Bina Sarana
                                                           Sawit Utama -
                                                                 untuk
                                          430.513.772.63 pembiayaan                        0,63999998
                                                                             2.739.907.305            %
                                                6              proses                       56948853
                                                             pembibitan
                                                         tanaman kelapa
                                                                 sawit
                                                         PT. Bina Sarana
                                                           Sawit Utama -
                                                                 untuk
                                          430.513.772.63                                   12,6499996
                                                         pembiayaan dan 54.441.614.234                %
                                                6                                           18530273
                                                             pemupukan
                                                         tanaman selama
                                                            periode TBM
Page 4
  Jenis
            Kode Nama
Penawaran               Tanggal Efektif                          Rencana List
               Efek
  Umum
                                               Hasil
                                             Realisasi                      Jumlah
                                              Bersih         Uraian      (satuan mata    Persentase
                                           (satuan mata                      uang)
                                               uang)
                                                           PT. Prasetya
                                                           Mitra Muda -
                                                               untuk
                                                            pemenuhan
                                          430.513.772.63 modal kerja PMM                 22,2099990
                                                                          95.634.459.899            %
                                                6        dalam pembelian                  84472656
                                                             pupuk dan
                                                           agrochemical
                                                         atau bahan kimia
                                                             pertanian
                                                          PT. Nusantara
                                                          Sawit Persada-
                                                               untuk
                                                            pemenuhan
                                          430.513.772.63 modal kerja NSP                 9,56999969
                                                                          41.214.200.600            %
                                                6        dalam pembelian                   4824219
                                                             pupuk dan
                                                           agrochemical
                                                         atau bahan kimia
                                                             pertanian
Page 5
  Jenis
            Kode Nama
Penawaran               Tanggal Efektif                           Rencana List
               Efek
  Umum
                                               Hasil
                                             Realisasi                       Jumlah
                                              Bersih          Uraian      (satuan mata     Persentase
                                           (satuan mata                       uang)
                                               uang)
                                                         PT. Borneo Sawit
                                                         Perdana - untuk
                                                         kebutuhan biaya
                                                               belanja
                                                            modal/capital
                                          430.513.772.63                    128.293.104.24 29,7999992
                                                             expenditure                              %
                                                6                                  6        37060547
                                                           (CAPEX) BSP
                                                                dalam
                                                            membangun
                                                           fasilitas pabrik
                                                            kelapa sawit
                                                         PT. Borneo Sawit
                                                         Perdana - untuk
                                                         kebutuhan biaya
                                                               belanja
                                                            modal/capital
                                          430.513.772.63                                   3,20000004
                                                             expenditure    13.776.440.724            %
                                                6                                            7683716
                                                           (CAPEX) BSP
                                                                dalam
                                                            membangun
                                                           pembangunan
                                                          terminal khusus
                                                         PT. Borneo Sawit
                                                         Perdana - untuk
                         28 Februari                         pemenuhan
IPO Saham     NSSS                                       modal kerja BSP
                            2023          430.513.772.63                                   21,0100002
                                                         dalam pembelian 90.468.294.628               %
                                                6                                           28881836
                                                              pupuk dan
                                                            agrochemical
                                                         atau bahan kimia
                                                              pertanian
                                                         PT. Bina Sarana
                                                           Sawit Utama -
                                                                 untuk
                                          430.513.772.63                                   0,92000001
                                                            melanjutkan      3.945.751.000            %
                                                6                                           66893005
                                                               proses
                                                            pembebasan
                                                                 lahan
                                                         PT. Bina Sarana
                                                           Sawit Utama -
                                                                 untuk
                                          430.513.772.63 pembiayaan                        0,63999998
                                                                             2.739.907.305            %
                                                6              proses                       56948853
                                                             pembibitan
                                                         tanaman kelapa
                                                                 sawit
                                                         PT. Bina Sarana
                                                           Sawit Utama -
                                                                 untuk
                                          430.513.772.63                                   12,6499996
                                                         pembiayaan dan 54.441.614.234                %
                                                6                                           18530273
                                                             pemupukan
                                                         tanaman selama
                                                            periode TBM
Page 6
  Jenis
            Kode Nama
Penawaran               Tanggal Efektif                          Rencana List
               Efek
  Umum
                                               Hasil
                                             Realisasi                      Jumlah
                                              Bersih         Uraian      (satuan mata    Persentase
                                           (satuan mata                      uang)
                                               uang)
                                                           PT. Prasetya
                                                           Mitra Muda -
                                                               untuk
                                                            pemenuhan
                                          430.513.772.63 modal kerja PMM                 22,2099990
                                                                          95.634.459.899            %
                                                6        dalam pembelian                  84472656
                                                             pupuk dan
                                                           agrochemical
                                                         atau bahan kimia
                                                             pertanian
                                                          PT. Nusantara
                                                          Sawit Persada-
                                                               untuk
                                                            pemenuhan
                                          430.513.772.63 modal kerja NSP                 9,56999969
                                                                          41.214.200.600            %
                                                6        dalam pembelian                   4824219
                                                             pupuk dan
                                                           agrochemical
                                                         atau bahan kimia
                                                             pertanian
Page 7
Rincian Realisasi Penawaran Umum

    Jenis
                Kode Nama
  Penawaran                   Tanggal Efektif   Realisasi List
                   Efek
    Umum
Page 8
  Jenis
            Kode Nama
Penawaran               Tanggal Efektif                            Realisasi List
               Efek
  Umum
                                               Hasil
                                             Realisasi                         Jumlah
                                              Bersih          Uraian        (satuan mata   Persentase
                                           (satuan mata                         uang)
                                               uang)
                                                         PT. Borneo Sawit
                                                         Perdana - untuk
                                                         kebutuhan biaya
                                                               belanja
                                                            modal/capital
                                          430.513.772.63                    128.293.104.24 29,799999
                                                             expenditure                               %
                                                6                                  6       237060547
                                                           (CAPEX) BSP
                                                                dalam
                                                            membangun
                                                           fasilitas pabrik
                                                            kelapa sawit
                                                         PT. Borneo Sawit
                                                         Perdana - untuk
                                                         kebutuhan biaya
                                                               belanja
                                                            modal/capital
                                          430.513.772.63                                   3,2000000
                                                             expenditure    13.776.440.724             %
                                                6                                           47683716
                                                           (CAPEX) BSP
                                                                dalam
                                                            membangun
                                                           pembangunan
                                                          terminal khusus
                                                         PT. Borneo Sawit
                                                         Perdana - untuk
                         28 Februari                         pemenuhan
IPO Saham     NSSS
                            2023                         modal kerja BSP
                                          430.513.772.63                                   21,010000
                                                         dalam pembelian 90.468.294.628                %
                                                6                                          228881836
                                                              pupuk dan
                                                            agrochemical
                                                         atau bahan kimia
                                                              pertanian
                                                         PT. Bina Sarana
                                                           Sawit Utama -
                                                                 untuk
                                          430.513.772.63                                   0,9200000
                                                            melanjutkan      3.945.751.000             %
                                                6                                          166893005
                                                               proses
                                                            pembebasan
                                                                 lahan
                                                         PT. Bina Sarana
                                                           Sawit Utama -
                                                                 untuk
                                          430.513.772.63 pembiayaan                        0,6399999
                                                                             2.739.907.305             %
                                                6              proses                      856948853
                                                             pembibitan
                                                         tanaman kelapa
                                                                 sawit
                                                         PT. Bina Sarana
                                                           Sawit Utama -
                                                                 untuk
                                          430.513.772.63                                   12,649999
                                                         pembiayaan dan 54.441.614.234                 %
                                                6                                          618530273
                                                             pemupukan
                                                         tanaman selama
                                                            periode TBM
Page 9
  Jenis
            Kode Nama
Penawaran               Tanggal Efektif                          Realisasi List
               Efek
  Umum
                                               Hasil
                                             Realisasi                       Jumlah
                                              Bersih         Uraian       (satuan mata   Persentase
                                           (satuan mata                       uang)
                                               uang)
                                                           PT. Prasetya
                                                           Mitra Muda -
                                                               untuk
                                                            pemenuhan
                                          430.513.772.63 modal kerja PMM                 22,209999
                                                                          95.634.459.899           %
                                                6        dalam pembelian                 084472656
                                                             pupuk dan
                                                           agrochemical
                                                         atau bahan kimia
                                                             pertanian
                                                          PT. Nusantara
                                                          Sawit Persada-
                                                               untuk
                                                            pemenuhan
                                          430.513.772.63 modal kerja NSP                 9,5699996
                                                                          41.214.200.600           %
                                                6        dalam pembelian                  94824219
                                                             pupuk dan
                                                           agrochemical
                                                         atau bahan kimia
                                                             pertanian
Page 10
  Jenis
            Kode Nama
Penawaran               Tanggal Efektif                            Realisasi List
               Efek
  Umum
                                               Hasil
                                             Realisasi                         Jumlah
                                              Bersih          Uraian        (satuan mata   Persentase
                                           (satuan mata                         uang)
                                               uang)
                                                         PT. Borneo Sawit
                                                         Perdana - untuk
                                                         kebutuhan biaya
                                                               belanja
                                                            modal/capital
                                          430.513.772.63                    128.293.104.24 29,799999
                                                             expenditure                               %
                                                6                                  6       237060547
                                                           (CAPEX) BSP
                                                                dalam
                                                            membangun
                                                           fasilitas pabrik
                                                            kelapa sawit
                                                         PT. Borneo Sawit
                                                         Perdana - untuk
                                                         kebutuhan biaya
                                                               belanja
                                                            modal/capital
                                          430.513.772.63                                   3,2000000
                                                             expenditure    13.776.440.724             %
                                                6                                           47683716
                                                           (CAPEX) BSP
                                                                dalam
                                                            membangun
                                                           pembangunan
                                                          terminal khusus
                                                         PT. Borneo Sawit
                                                         Perdana - untuk
                         28 Februari                         pemenuhan
IPO Saham     NSSS
                            2023                         modal kerja BSP
                                          430.513.772.63                                   21,010000
                                                         dalam pembelian 90.468.294.628                %
                                                6                                          228881836
                                                              pupuk dan
                                                            agrochemical
                                                         atau bahan kimia
                                                              pertanian
                                                         PT. Bina Sarana
                                                           Sawit Utama -
                                                                 untuk
                                          430.513.772.63                                   0,9200000
                                                            melanjutkan      3.945.751.000             %
                                                6                                          166893005
                                                               proses
                                                            pembebasan
                                                                 lahan
                                                         PT. Bina Sarana
                                                           Sawit Utama -
                                                                 untuk
                                          430.513.772.63 pembiayaan                        0,6399999
                                                                             2.739.907.305             %
                                                6              proses                      856948853
                                                             pembibitan
                                                         tanaman kelapa
                                                                 sawit
                                                         PT. Bina Sarana
                                                           Sawit Utama -
                                                                 untuk
                                          430.513.772.63                                   12,649999
                                                         pembiayaan dan 54.441.614.234                 %
                                                6                                          618530273
                                                             pemupukan
                                                         tanaman selama
                                                            periode TBM
Page 11
   Jenis
               Kode Nama
 Penawaran                     Tanggal Efektif                             Realisasi List
                  Efek
   Umum
                                                      Hasil
                                                    Realisasi                           Jumlah
                                                     Bersih           Uraian         (satuan mata       Persentase
                                                  (satuan mata                           uang)
                                                      uang)
                                                                  PT. Prasetya
                                                                  Mitra Muda -
                                                                      untuk
                                                                   pemenuhan
                                                 430.513.772.63 modal kerja PMM                 22,209999
                                                                                 95.634.459.899           %
                                                       6        dalam pembelian                 084472656
                                                                    pupuk dan
                                                                  agrochemical
                                                                atau bahan kimia
                                                                    pertanian
                                                                 PT. Nusantara
                                                                 Sawit Persada-
                                                                      untuk
                                                                   pemenuhan
                                                 430.513.772.63 modal kerja NSP                 9,5699996
                                                                                 41.214.200.600           %
                                                       6        dalam pembelian                  94824219
                                                                    pupuk dan
                                                                  agrochemical
                                                                atau bahan kimia
                                                                    pertanian

Rincian Biaya Penawaran Umum

   Jenis                                            Jumlah                                     Jumlah
                                    Tanggal                                                              Persenta
 Penawaran       Kode Efek                           Hasil                Uraian            (Satuan Mata
                                     Efektif                                                                se
   Umum                                            Penawaran                                    Uang)
 IPO Saham        NSSS            28 Februari    453.165.883.10a. biaya jasa penjaminan
                                     2023              0       (underwriting fee);
                                                                                            3.429.141.732     0,76   %


                                                                 b. biaya jasa
                                                                 penyelenggaraan
                                                                                            6.797.488.247     1,5    %
                                                                 (management fee);

                                                                 c. biaya jasa penjualan
                                                                 (selling fee);
                                                                                            3.368.346.514     0,74   %


                                                                 d. biaya jasa profesi
                                                                 penunjang pasar modal;
                                                                                            4.372.000.000     0,96   %


                                                                 e. biaya jasa lembaga
                                                                 penunjang pasar modal;
                                                                                            120.000.000       0,03   %
                                                                 dan

                                                                 f. biaya jasa konsultasi
                                                                 keuangan (financial
                                                                                                    0          0     %
                                                                 advisory fee).

                                                                 g. Biaya lain-lain yang
                                                                 dapat diatribusikan
                                                                                            4.565.133.971     1,01   %
                                                                 langsung sebagai biaya
                                                                 emisi***)
Page 12
Dana yang diperoleh dari Konversi Waran dan Konversi efek Lainnya

                                                                                    Rencana Realisasi
                                                                          Jumlah
                                                                                    Pengguna Pengguna
                                         Total efek                      Efek yang                      Sisa Dana
                             Tanggal                                                 an Dana an Dana
 No Jenis Efek Kode Efek                    yang       Harga     Nilai     belum                           Hasil
                            Penerbitan                                               Menurut Menurut
                                         diterbitkan                     dikonversi                      Konversi
                                                                                    Prospektu Prospektu
                                                                            kan
                                                                                        s         s
       Waran                08 Maret 1.784.117.                338.982.3 1.770.784. 338.982.3 2.533.335.
 1                NSSS-W                               190                                                 0
       Seri I                 2023      650                     53.500      305      53.500      550

Demikian untuk diketahui.


Hormat Kami,
PT Nusantara Sawit Sejahtera Tbk




Teguh Patriawan

Direktur Utama




PT Nusantara Sawit Sejahtera Tbk
Gedung Menara Imperium LT.30 Suite D, JL. HR Rasuna Said Kav 1, Guntur,
Telepon : (+62 21) 8354 045, Fax : (+62 21) 8317 688, www.nssgroup.id



Nama Pengirim                       Teguh Patriawan

Jabatan                             Direktur Utama
Tanggal dan Waktu                   14-07-2026 22:09

Lampiran                           1. Surat Pengantar LRPD NSSS Juni 2026.docx.pdf


                                   2. Lampiran LRPD NSSS Juni 2026.pdf


  Dokumen ini merupakan dokumen resmi PT Nusantara Sawit Sejahtera Tbk yang tidak memerlukan tanda tangan
      karena dihasilkan secara elektronik oleh sistem pelaporan elektronik. PT Nusantara Sawit Sejahtera Tbk
                    bertanggung jawab penuh atas informasi yang tertera didalam dokumen ini.
Page 13
Go To Indonesian Page

 Announcement Number                     064/NSS/SK/VII/2026

 Issuer Name                             PT Nusantara Sawit Sejahtera Tbk

 Issuer Code                             NSSS

 Attachment                              2

 Subject                                 Laporan Penggunaan Dana Hasil Penawaran Umum


Fund received form the public offering            IDR


                                        Amount of                                Plan for use Realized
                                         Proceed      Cost of                     of proceed Use of Fund
   Type of                                                             Net                                  Remaining
                Name of                  from the      Public                   according to according to
    public                 Listing Date                            Realization                               Fund (in
                Issuance                   Public    Offering (in                     the          the
   offering                                                       (in Currency)                             Currency)
                                        Offering (in Currency)                   Prospectus Prospectus
                                        Currency)                               (in Currency) (in Currency)

                                             453,165,883, 22,652,110,4 430,513,772, 430,513,772, 430,513,772,
IPO Saham         NSSS                                                                                                    0
                                                 100           64          636          636          636
                                             453,165,883, 22,652,110,4 430,513,772, 430,513,772, 430,513,772,
IPO Saham         NSSS                                                                                                    0
                                                 100           64          636          636          636


Allocation of Remaining Fund


 Type of public Name / Code of
                                                                        List of allocation
    offering      Securities

                                  Remaining Fund Interest/Yield                                                 Relationship with
                                                                           Allocation        Retention Period
                                   (in Currency)      Rate                                                       the company
  IPO Saham             NSSS
                                              0              0      %           -                   -              pihak Tiga

                                              0              0      %           -                   -              pihak Tiga



  IPO Saham             NSSS
Page 14
Details of Public Offering Plan


 Type of public Name / Code of
                                  Listing date   List of plans
    offering      Securities
Page 15
Type of public Name / Code of
                                Listing date                            List of plans
   offering      Securities



                                               Net Realization                    Amount (in
                                                                 Description                    Percentage
                                                (in Currency)                     Currency)


                                                              PT. Borneo Sawit
                                                              Perdana - untuk
                                                              kebutuhan biaya
                                                                    belanja
                                                                 modal/capital
                                               430,513,772,63                    128,293,104,24 29.7999992
                                                                  expenditure                              %
                                                     6                                  6        37060547
                                                                (CAPEX) BSP
                                                                     dalam
                                                                 membangun
                                                                fasilitas pabrik
                                                                 kelapa sawit
                                                              PT. Borneo Sawit
                                                              Perdana - untuk
                                                              kebutuhan biaya
                                                                    belanja
                                                                 modal/capital
                                               430,513,772,63                                   3.20000004
                                                                  expenditure    13,776,440,724            %
                                                     6                                            7683716
                                                                (CAPEX) BSP
                                                                     dalam
                                                                 membangun
                                                                pembangunan
                                                               terminal khusus
                                                              PT. Borneo Sawit
                                                              Perdana - untuk
                                                                  pemenuhan
 IPO Saham         NSSS                                       modal kerja BSP
                                               430,513,772,63                                   21.0100002
                                                              dalam pembelian 90,468,294,628               %
                                                     6                                           28881836
                                                                   pupuk dan
                                                                 agrochemical
                                                              atau bahan kimia
                                                                   pertanian
                                                              PT. Bina Sarana
                                                                Sawit Utama -
                                                                      untuk
                                               430,513,772,63                                   0.92000001
                                                                 melanjutkan      3,945,751,000            %
                                                     6                                           66893005
                                                                    proses
                                                                 pembebasan
                                                                      lahan
                                                              PT. Bina Sarana
                                                                Sawit Utama -
                                                                      untuk
                                               430,513,772,63 pembiayaan                        0.63999998
                                                                                  2,739,907,305            %
                                                     6              proses                       56948853
                                                                  pembibitan
                                                              tanaman kelapa
                                                                      sawit
                                                              PT. Bina Sarana
                                                                Sawit Utama -
                                                                      untuk
                                               430,513,772,63                                   12.6499996
                                                              pembiayaan dan 54,441,614,234                %
                                                     6                                           18530273
                                                                  pemupukan
                                                              tanaman selama
                                                                 periode TBM
Page 16
Type of public Name / Code of
                                Listing date                            List of plans
   offering      Securities



                                               Net Realization                    Amount (in
                                                                 Description                   Percentage
                                                (in Currency)                     Currency)


                                                                PT. Prasetya
                                                                Mitra Muda -
                                                                    untuk
                                                                 pemenuhan
                                               430,513,772,63 modal kerja PMM                 22.2099990
                                                                               95,634,459,899            %
                                                     6        dalam pembelian                  84472656
                                                                  pupuk dan
                                                                agrochemical
                                                              atau bahan kimia
                                                                  pertanian
                                                               PT. Nusantara
                                                               Sawit Persada-
                                                                    untuk
                                                                 pemenuhan
                                               430,513,772,63 modal kerja NSP                 9.56999969
                                                                               41,214,200,600            %
                                                     6        dalam pembelian                   4824219
                                                                  pupuk dan
                                                                agrochemical
                                                              atau bahan kimia
                                                                  pertanian
Page 17
Type of public Name / Code of
                                Listing date                            List of plans
   offering      Securities



                                               Net Realization                    Amount (in
                                                                 Description                    Percentage
                                                (in Currency)                     Currency)


                                                              PT. Borneo Sawit
                                                              Perdana - untuk
                                                              kebutuhan biaya
                                                                    belanja
                                                                 modal/capital
                                               430,513,772,63                    128,293,104,24 29.7999992
                                                                  expenditure                              %
                                                     6                                  6        37060547
                                                                (CAPEX) BSP
                                                                     dalam
                                                                 membangun
                                                                fasilitas pabrik
                                                                 kelapa sawit
                                                              PT. Borneo Sawit
                                                              Perdana - untuk
                                                              kebutuhan biaya
                                                                    belanja
                                                                 modal/capital
                                               430,513,772,63                                   3.20000004
                                                                  expenditure    13,776,440,724            %
                                                     6                                            7683716
                                                                (CAPEX) BSP
                                                                     dalam
                                                                 membangun
                                                                pembangunan
                                                               terminal khusus
                                                              PT. Borneo Sawit
                                                              Perdana - untuk
                                                                  pemenuhan
 IPO Saham         NSSS                                       modal kerja BSP
                                               430,513,772,63                                   21.0100002
                                                              dalam pembelian 90,468,294,628               %
                                                     6                                           28881836
                                                                   pupuk dan
                                                                 agrochemical
                                                              atau bahan kimia
                                                                   pertanian
                                                              PT. Bina Sarana
                                                                Sawit Utama -
                                                                      untuk
                                               430,513,772,63                                   0.92000001
                                                                 melanjutkan      3,945,751,000            %
                                                     6                                           66893005
                                                                    proses
                                                                 pembebasan
                                                                      lahan
                                                              PT. Bina Sarana
                                                                Sawit Utama -
                                                                      untuk
                                               430,513,772,63 pembiayaan                        0.63999998
                                                                                  2,739,907,305            %
                                                     6              proses                       56948853
                                                                  pembibitan
                                                              tanaman kelapa
                                                                      sawit
                                                              PT. Bina Sarana
                                                                Sawit Utama -
                                                                      untuk
                                               430,513,772,63                                   12.6499996
                                                              pembiayaan dan 54,441,614,234                %
                                                     6                                           18530273
                                                                  pemupukan
                                                              tanaman selama
                                                                 periode TBM
Page 18
Type of public Name / Code of
                                Listing date                            List of plans
   offering      Securities



                                               Net Realization                    Amount (in
                                                                 Description                   Percentage
                                                (in Currency)                     Currency)


                                                                PT. Prasetya
                                                                Mitra Muda -
                                                                    untuk
                                                                 pemenuhan
                                               430,513,772,63 modal kerja PMM                 22.2099990
                                                                               95,634,459,899            %
                                                     6        dalam pembelian                  84472656
                                                                  pupuk dan
                                                                agrochemical
                                                              atau bahan kimia
                                                                  pertanian
                                                               PT. Nusantara
                                                               Sawit Persada-
                                                                    untuk
                                                                 pemenuhan
                                               430,513,772,63 modal kerja NSP                 9.56999969
                                                                               41,214,200,600            %
                                                     6        dalam pembelian                   4824219
                                                                  pupuk dan
                                                                agrochemical
                                                              atau bahan kimia
                                                                  pertanian
Page 19
Details of Public Offering Realization


 Type of Public Name / Code of
                                     Listing Date   Realization Plan
    Offering      Securities
Page 20
Type of Public Name / Code of
                                Listing Date                          Realization Plan
   Offering      Securities



                                               Net Realization                   Amount (in
                                                                 Description                    Percentage
                                                (in Currency)                    Currency)


                                                              PT. Borneo Sawit
                                                              Perdana - untuk
                                                              kebutuhan biaya
                                                                    belanja
                                                                 modal/capital
                                               430,513,772,63                    128,293,104,24 29.7999992
                                                                  expenditure                              %
                                                     6                                  6        37060547
                                                                (CAPEX) BSP
                                                                     dalam
                                                                 membangun
                                                                fasilitas pabrik
                                                                 kelapa sawit
                                                              PT. Borneo Sawit
                                                              Perdana - untuk
                                                              kebutuhan biaya
                                                                    belanja
                                                                 modal/capital
                                               430,513,772,63                                   3.20000004
                                                                  expenditure    13,776,440,724            %
                                                     6                                            7683716
                                                                (CAPEX) BSP
                                                                     dalam
                                                                 membangun
                                                                pembangunan
                                                               terminal khusus
                                                              PT. Borneo Sawit
                                                              Perdana - untuk
                                                                  pemenuhan
 IPO Saham         NSSS                                       modal kerja BSP
                                               430,513,772,63                                   21.0100002
                                                              dalam pembelian 90,468,294,628               %
                                                     6                                           28881836
                                                                   pupuk dan
                                                                 agrochemical
                                                              atau bahan kimia
                                                                   pertanian
                                                              PT. Bina Sarana
                                                                Sawit Utama -
                                                                      untuk
                                               430,513,772,63                                   0.92000001
                                                                 melanjutkan      3,945,751,000            %
                                                     6                                           66893005
                                                                    proses
                                                                 pembebasan
                                                                      lahan
                                                              PT. Bina Sarana
                                                                Sawit Utama -
                                                                      untuk
                                               430,513,772,63 pembiayaan                        0.63999998
                                                                                  2,739,907,305            %
                                                     6              proses                       56948853
                                                                  pembibitan
                                                              tanaman kelapa
                                                                      sawit
                                                              PT. Bina Sarana
                                                                Sawit Utama -
                                                                      untuk
                                               430,513,772,63                                   12.6499996
                                                              pembiayaan dan 54,441,614,234                %
                                                     6                                           18530273
                                                                  pemupukan
                                                              tanaman selama
                                                                 periode TBM
Page 21
Type of Public Name / Code of
                                Listing Date                          Realization Plan
   Offering      Securities



                                               Net Realization                   Amount (in
                                                                 Description                  Percentage
                                                (in Currency)                    Currency)


                                                                PT. Prasetya
                                                                Mitra Muda -
                                                                    untuk
                                                                 pemenuhan
                                               430,513,772,63 modal kerja PMM                 22.2099990
                                                                               95,634,459,899            %
                                                     6        dalam pembelian                  84472656
                                                                  pupuk dan
                                                                agrochemical
                                                              atau bahan kimia
                                                                  pertanian
                                                               PT. Nusantara
                                                               Sawit Persada-
                                                                    untuk
                                                                 pemenuhan
                                               430,513,772,63 modal kerja NSP                 9.56999969
                                                                               41,214,200,600            %
                                                     6        dalam pembelian                   4824219
                                                                  pupuk dan
                                                                agrochemical
                                                              atau bahan kimia
                                                                  pertanian
Page 22
Type of Public Name / Code of
                                Listing Date                          Realization Plan
   Offering      Securities



                                               Net Realization                   Amount (in
                                                                 Description                    Percentage
                                                (in Currency)                    Currency)


                                                              PT. Borneo Sawit
                                                              Perdana - untuk
                                                              kebutuhan biaya
                                                                    belanja
                                                                 modal/capital
                                               430,513,772,63                    128,293,104,24 29.7999992
                                                                  expenditure                              %
                                                     6                                  6        37060547
                                                                (CAPEX) BSP
                                                                     dalam
                                                                 membangun
                                                                fasilitas pabrik
                                                                 kelapa sawit
                                                              PT. Borneo Sawit
                                                              Perdana - untuk
                                                              kebutuhan biaya
                                                                    belanja
                                                                 modal/capital
                                               430,513,772,63                                   3.20000004
                                                                  expenditure    13,776,440,724            %
                                                     6                                            7683716
                                                                (CAPEX) BSP
                                                                     dalam
                                                                 membangun
                                                                pembangunan
                                                               terminal khusus
                                                              PT. Borneo Sawit
                                                              Perdana - untuk
                                                                  pemenuhan
 IPO Saham         NSSS                                       modal kerja BSP
                                               430,513,772,63                                   21.0100002
                                                              dalam pembelian 90,468,294,628               %
                                                     6                                           28881836
                                                                   pupuk dan
                                                                 agrochemical
                                                              atau bahan kimia
                                                                   pertanian
                                                              PT. Bina Sarana
                                                                Sawit Utama -
                                                                      untuk
                                               430,513,772,63                                   0.92000001
                                                                 melanjutkan      3,945,751,000            %
                                                     6                                           66893005
                                                                    proses
                                                                 pembebasan
                                                                      lahan
                                                              PT. Bina Sarana
                                                                Sawit Utama -
                                                                      untuk
                                               430,513,772,63 pembiayaan                        0.63999998
                                                                                  2,739,907,305            %
                                                     6              proses                       56948853
                                                                  pembibitan
                                                              tanaman kelapa
                                                                      sawit
                                                              PT. Bina Sarana
                                                                Sawit Utama -
                                                                      untuk
                                               430,513,772,63                                   12.6499996
                                                              pembiayaan dan 54,441,614,234                %
                                                     6                                           18530273
                                                                  pemupukan
                                                              tanaman selama
                                                                 periode TBM
Page 23
 Type of Public Name / Code of
                                     Listing Date                               Realization Plan
    Offering      Securities



                                                     Net Realization                        Amount (in
                                                                         Description                          Percentage
                                                      (in Currency)                         Currency)


                                                                      PT. Prasetya
                                                                      Mitra Muda -
                                                                          untuk
                                                                       pemenuhan
                                                     430,513,772,63 modal kerja PMM                 22.2099990
                                                                                     95,634,459,899            %
                                                           6        dalam pembelian                  84472656
                                                                        pupuk dan
                                                                      agrochemical
                                                                    atau bahan kimia
                                                                        pertanian
                                                                     PT. Nusantara
                                                                     Sawit Persada-
                                                                          untuk
                                                                       pemenuhan
                                                     430,513,772,63 modal kerja NSP                 9.56999969
                                                                                     41,214,200,600            %
                                                           6        dalam pembelian                   4824219
                                                                        pupuk dan
                                                                      agrochemical
                                                                    atau bahan kimia
                                                                        pertanian

Details of Cost of Public Offering

                                                       Amount of
Type of Public                                                                                       Amount (in   Percenta
                  Securities Code     Listing Date   Proceed for the     Description
   Offering                                                                                          Currency)       ge
                                                     Public Offering
  IPO Saham            NSSS                          453,165,883,10a. Underwriting fee
                                                            0
                                                                                                    3,429,141,732 0.76       %


                                                                       b. Management fee
                                                                                                    6,797,488,247 1.5        %


                                                                       c. Selling fee
                                                                                                    3,368,346,514 0.74       %


                                                                       d. Capital Market
                                                                       Supporting Profession
                                                                                                    4,372,000,000 0.96       %
                                                                       fee

                                                                       e. Capital Market
                                                                       Supporting Institution fee
                                                                                                    120,000,000 0.03         %


                                                                       f. Financial advisory fee
                                                                                                          0       0          %


                                                                       g. Other fees which can
                                                                       be directly attributed as
                                                                                                 4,565,133,971 1.01          %
                                                                       securities issuance fees
Page 24
Funds received from warrant conversion and conversion from other securities

                                                                                                             Amount of
                                                                                       Plan of Realized
                                                                          Amount of                            Fund
                                     Total                                           use of fund use of fund
       Type of Securities Issuance                                        Securities                         Remaining
 No                                Securities         Price      Value                according according
      Securities Code       date                                           not yet                            after the
                                    Issued                                              to the     to the
                                                                          converted                          Conversio
                                                                                     prospectus prospectus
                                                                                                                  n
        Waran                           1,784,117,             338,982,3 1,770,784, 338,982,3 2,533,335,
  1                NSSS-W                              190                                                       0
        Seri I                             650                  53,500      305      53,500      550

Thus to be informed accordingly.


 Respectfully,
 PT Nusantara Sawit Sejahtera Tbk




 Teguh Patriawan

 Direktur Utama




 PT Nusantara Sawit Sejahtera Tbk
 Gedung Menara Imperium LT.30 Suite D, JL. HR Rasuna Said Kav 1, Guntur,
 Phone : (+62 21) 8354 045, Fax : (+62 21) 8317 688, www.nssgroup.id



 Sender Name                         Teguh Patriawan

 Function                            Direktur Utama

 Date and Time                       14-07-2026 22:09

 Attachment                         1. Surat Pengantar LRPD NSSS Juni 2026.docx.pdf


                                    2. Lampiran LRPD NSSS Juni 2026.pdf


     This is an official document of PT Nusantara Sawit Sejahtera Tbk that does not require a signature as it was
   generated electronically by the electronic reporting system. PT Nusantara Sawit Sejahtera Tbk is fully responsible
                                   for the information contained within this document.

File

File Open PDF
Source IDX
Size0.06 MB
Published14 Jul 2026
Pages24
Characters82,078
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 7 people and organisations named in the text · linked when the evidence is strong

linked org Nusantara Sawit Sejahtera Tbk · Nama Perusahaan p.1 ×30
linked person Teguh Patriawan · Direktur Utama p.12 ×5
unresolved org PT. Borneo Sawit Perdana p.3 ×24
unresolved org PT. Bina Sarana Sawit Utama p.3 ×24
unresolved org PT. Prasetya Mitra Muda p.4 ×8
unresolved org PT. Nusantara Sawit Persada-untuk p.4 ×8
unresolved person Function · Direktur Utama p.24

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result