(SP BRM
PT Bumi Resources Minerals Tbk.
Bakrie Tower, 6 & 10" Floor
Komplek Rasuna Epicentrum
Jl. H.R. Rasuna Said, Kuningan
Jakarta Selatan 12940
Indonesia
T 462 21 5794 5698
F 462215794 5687
www.bumiresourcesminerals.com
LAPORAN TENTANG AKTIVITAS EKSPLORASI
OLEH ANAK PERUSAHAAN PT BUMI RESOURCES MINERALS TBK.
(REPORT ON EXPLORATION ACTIVITIES
BY SUBSIDIARIES OF PT BUMI RESOURCES MINERALS TBK.)
PT Citra Palu Minerals
Nama Perusahaan
(Name of Company
Tahap Kegiatan KK
(Phase of Activity of Contract of Work)
Laporan Eksplorasi Periode
(Period of Exploration Report
PT Citra Palu Minerals ("PT CPM")
Operasi Produksi (Production Operation)
April — Juni (Apr-June) 2025
Daerah Eksplorasi Exploration Areas
1. Blok I, Sulawesi Tengah (Operasi Produksi) 1. Block 1, Central Sulawesi (Production
2. Blok II, Sulawesi Selatan (Eksplorasi) Operation)
3. Blok IV, Sulawesi Tengah (Eksplorasi) 2. Block II, South Sulawesi (Exoloration)
4. Blok V, Sulawesi Tengah (Eksplorasi) 3. Block IV, Central Sulawesi (Exploration)
5. Blok VI, Sulawesi Tengah (Eksplorasi) 4. Block V, Central Sulawesi (Exploration)
5. Block VI, Central Sulawesi (Exploration)
Biaya Eksplorasi
Exploration Cost
1.107.250 Dollar AS
USD 1,107,250
Bentuk Kegiatan Eksplorasi
Form of Exploration Activities
1. Melanjutkan kegiatan pengeboran sumber
daya di Prospek River Reef - Watuputih, Blok |
Poboya, dengan total kedalaman saat ini
85.282,55m.
2. Menyelesaikan kegiatan pengeboran
eksplorasi di area Prospek Hill Reef 1, Blok |
Poboya, dengan total kedalaman saat ini
17.931,45m.
3. Melanjutkan kegiatan pengeboran eksplorasi
di area Prospek Barako Blok I Poboya, dengan
total kedalaman saat ini 1.169,20m.
4. Melanjutkan kegiatan pengeboran eksplorasi
di area Blok IV Prospek Anggasan, dengan
total kedalaman saat ini 1.246,00m.
5. Melanjutkan kegiatan pemetaan geologi di
Area Blok IV meliputi area Anggasan, Janja
dan Taanes, dengan total 297 sampel batuan:
1. Continue resource drilling program at the River
Reef-Watuputih Prospect, Block I Poboya, with
a current total depth of 85,282.55.
2. Completed exploration drilling program in the
HIII Reef 1 Prospect area, Block I Poboya, with
a current total depth of 17,931.45m.
3. Continue exploration drilling program in the
Barako Prospect area, Block I Poboya, with a
current total depth of 1, 169.20m.
4. Continue exploration drilling program in the
Anggasan Prospect Block IV, with a current
total depth of 1,246.00m.
5. Continue geological mapping activities in
Block IV including Anggasan, Janja, and
Taanes area, with a total of 297 rock samples
collected.
Page 2 OCR 0.903
(SP BRM 6. Melakukan kegiatan pemetaan geologi di Area |6. Conducted geological mapping activities in South River Reef - Blok I, dengan total 14 South of River Reef - Block 1, with a total of 14 sampel batuan. rock samples. 7. Melakukan pengiriman sampel inti bor untuk | 7. Carried out geochemical analysis from drill analisis geokimia (Au, Ag, Cu, Pb, Zn, As, Sb, core samples (Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Mo, Hg dan kombinasi Au 4 ICP OES multi Hg and combination of Au # ICP OES multi elemen) dan analisis AAT (Air Asam Tambang) elements) and AAT (Add Mine Drainage) ke Laboratorium PT Geoservices. analysis by PT Geoservices Laboratory. 8. Melakukan pengiriman sampel batuan untuk |8. Carried out geochemical analysis from rock analisis geokimia (Au, Ag, Cu, Pb, Zn, As, Sb, samples (Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Hg, Mo, Hg dan kombinasi Au # ICP OES multi and Au # ICP-OES multi-element combination) elemen) ke Laboratorium PT Geoservices serta to PT Geoservices Laboratory, as well as analisis geokimia (kombinasi Au, Ag, Cu dan geochemical analysis (Au, Ag, Cu combination Agua Regia Digest) ke Laboratorium PT CPM. using Agua Regia Digest method) to PT CPM Laboratory Pihak-Pihak yang Terlibat Involved Parties 1. Laboratorium PT CPM 1. Internal PT CPM Laboratory 2. PT Sumagud Sapta Sinar 2. PT Sumagud Sapta Sinar 3. Laboratorium PT Geoservices 3. PT Geoservices Lahoratory 4. Bureau Varitas — PT IOL Indonesia 4. Bureau Varitas — PT IOL Indonesia 5. PT SN Cargo 5. PT SN Cargo Metode Pengujian dan Pemilihan Areal Testing Method and Selection Area 1. AAS 1. AAS 2. Spedific Gravity 2. Specific Gravity 3. Fire Assay 3. Fire Assay 4. Agua Regia Digest 4. Agua Regia Digest 5. Hg Analisis 5. Hg Analysis 6. ICP OES 42 unsur 6. ICP OES 42 elements 7. Analisis Air Asam Tambang 7. ARD Test Kemajuan Eksplorasi Terhadap Kegiatan Triwulan Sebelumnya Exploration Progress Guarter Activities toward the Preceding 1. Pengeboran sumber daya di Prospek River Reef - Watuputih Blok | Poboya dilakukan dengan menggunakan 3 rig. Total sebanyak 345 titik telah selesai dibor, termasuk 3 titik bor hidrogeologi dan 13 titik bor geotek, dengan total kedalaman 85.282,55m sampai akhir Juni 2025. Terdapat penambahan 5 titik bor dengan jumlah kedalaman 2.434,60m dari periode sebelumnya. Pengeboran eksplorasi di Prospek Barako Blok 1 Poboya diselesaikan dengan menggunakan 1 rig. Total 4 titik bor dengan total kedalaman 1.169,20m sampai akhir Juni 2025. Terdapat penambahan 1 titik bor dengan jumlah kedalaman 527,60m dari periode sebelumnya. Pengeboran eksplorasi di Blok IV Prospek 7. 3. Resources drilling program in River Reef- Watuputih Prospect Block 1 Poboya was conducted using 3 rigs. A Total of 345 drill holes has been completea, including 3 hydrogeology holes and 13 geotechnical holes, with total depth of 85,282.55m by the end of June 2025. There are 5 additional completed drill holes with total depth of 2,434.60m from previous period. Exploration drilling program in Barako Prospect Block 1 Poboya is completed using 1 rig. A total of 4 drill holes with total depth of 1,169.20m has been reached by the end of June 2025. There are 1 additional completed drill holes with total depth of 527.60m from previous period. Exploration drilling program Block IV in MN
Page 3 OCR 0.931
(SP BRM Anggasan diselesaikan dengan menggunakan 1 rig. Total 5 titik bor dengan total kedalaman 1.246,00m sampai akhir Juni 2025. Terdapat penambahan 2 titik bor dengan jumlah kedalaman 352,10m dari periode sebelumnya. Penambahan jumlah sampel sebanyak 2.800 sampel hasil pengeboran Prospek River Reef- Watuputih Blok I Poboya yang dikirim ke Laboratorium PT Geoservices untuk dianalisis geokimia (Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Hg dan kombinasi Au 4 ICP 42 unsur), serta 7 sampel untuk analisis AAT (Air Asam Tambang). Penambahan jumlah sampel sebanyak 1.002 sampel hasil pengeboran Prospek Barako Blok I Poboya yang dikirim ke Laboratorium PT Geoservices untuk dianalisis geokimia (Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Hg dan kombinasi Au 4 ICP 42 unsur dan 7 sampel untuk analisis air asam tambang. Penambahan jumlah sampel sebanyak 647 sampel hasil pengeboran Blok IV Prospek Anggasan yang dikirim ke Laboratorium PT Geoservices untuk dianalisis geokimia (Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Hg dan kombinasi Au & ICP 42 unsur dan 12 sampel untuk analisis air asam tambang. Total penambahan sebanyak 14 sampel batuan berasal dari kegiatan pemetaan geologi di area South River Reef, Blok I. Total penambahan sebanyak 297 sampel batuan dari kegiatan pemetaan geologi di area Anggasan, Janja dan Taanes Blok IV. Anggasan Prospect is completed using 1 rig. A total of 5 drill holes with total depth of 1,246.00m has been reached by the end of June 2025. There are additional 2 drill holes with total depth of 352.10m from previous period. Additional 2,800 drill core samples from River Reef - Watuputih Prospect of Block I Poboya drilling program have been sent to PT Geoservices Laboratory to be analyzed (Au, Ag, u, Pb, Zn, As, Sb, Mo, Hg and combination Au # ICP 42 elements), also 7 samples for ARD (Acid Rock Drainage). Additional 1,002 drill core samples irom Barako Prospect of Block 1 Poboya drilling program have been sent to PT Geoservices Laboratory to be analyzed (Au, Ag, u, Pb, Zn, As, Sb, Mo, Hg and combination Au # ICP 42 elements) and 7 sample for ARD (Acid Rock Drainage). Additional 647 drill core samples from Block IV Anggasan Prospect drilling program have been sent to PT Geoservices Laboratory to be analyzed (Au, Ag, u, Pb, Zn, As, Sb, Mo, Hg and combination Au # ICP 42 elements) and 12 sample for ARD (Acid Rock Drainage). Total additional 14 rock samples collected from geological mapping activity at South River Reef area, Block I. Total additional 297 rock samples collected from geological mapping activity at Anggasan, Janja, and Taanes areas, Block IV. Rencana Selanjutnya Next Plan Is Melanjutkan kegiatan pengeboran di Prospek River Reef - Watuputih, Blok | Poboya dengan tujuan untuk menambah sumber daya di Prospek River Reef. Melanjutkan pemetaan geologi detil di area Tinabogan di Blok IV dan area South River Reef di Blok I Poboya. 1. Continue resources drilling program in River Reef-Watuputih Prospect of Block 1 Poboya with objectives to increase resources in River Reef Prospect. Continue detailed geological mapping at Tinabogan area in Block IV and South River Reef area of Block I Poboya. Hambatan Eksplorasi Barriers to Exploration Kegiatan penambangan tanpa izin (PETI) oleh masyarakat sekitar. Ilegal mining activities by local community. Perizinan/ Persetujuan Baru Yang Diperoleh New Permits/Approvals Acguired wb,
Page 4 OCR 0.924
1. Nama Perusahaan (SP BRM PT. Dairi Prima Mineral (Name of Company Tahap Kegiatan KK (Phase of Activity of Contract of Work) Laporan Eksplorasi Bulan (Monthly Exploration Report) PT Dairi Prima Mineral Operasi Produksi (Production Operation) April — Juni (Apr-June) 2025 A. | Daerah Eksplorasi Exploration Areas Kegiatan eksplorasi pada Prospek Anjing Hitam | filed exploration activities on Anjing Hitam sudah selesai dilakukan dan saat ini prospek | Prospect has already been completed. The tersebut memasuki tahap Operasi Produksi. prospect currently is in Operation and Production stage. Selain Prospek Anjing Hitam, di dalam wilayah | Beside Anjing Hitam Prospect, there are some Kontrak Karya DPM masih terdapat prospek- | other prospect areas within DPM Contract of prospek lainnya dengan tahap kegiatan yang | Work tenement. The prospects work progress berbeda-beda dari eksplorasi regional hingga | are in different stages, range from regional pengeboran deliniasi sumberdaya. exploration to delineation resource drilling. Salah satu prospek yang paling maju | Lae Jehe Prospect is the most advantage pengerjaannya adalah Prospek Lae Jehe yang | exploration activities. This prospect is situated terletak sekitar 200 meter di sebelah baratlaut | approximately 200 meters toward northwest Prospek Anjing Hitam. Prospek ini sudah | 'rom Anjing Hitam Prospect. This prospect memasuki tahap pengeboran deliniasi | work stage is in resource delineation drilling sumberdaya dan masih akan dikembangkan | and will be developed to get final mineral hingga didapatkan sumberdaya mineral dengan | resource value with dominant measured and klasifikasi terukur dan tertunjuk yang lebih | indicated mineral resources dassification. dominan. B. | Biaya Eksplorasi Exploration Costs 26.375,88 Dolar AS USD 26,375.88 C. | Bentuk Kegiatan Eksplorasi Form of Exploration Activities Selama bulan April hingga Juni 2025 tidak ada | During April to June 2025 there is no kegiatan eksplorasi. exploration activities. B | Pihak-Pihak yang Terlibat Parties Involved E. | Metode Pengujian dan Pemilihan Areal Testing Method and Selection of Area F. | Kemajuan Eksplorasi Terhadap Bulan sebelumnya | Exploration Progress relative to Preceding Month 's Activities G. | Rencana Pengeboran Selanjutnya Next Drilling Plan - Penambahan titik bor di Prospek Lae Jehe dan Basecamp - Ifill drilling in Lae Jehe and Basecamp Prospect "Y
Page 5 OCR 0.896
(SP BRM Hambatan Eksplorasi Barriers to Exploration Perizinan / Persetujuan Baru Yang Diperoleh New Permits / Approvals Acguired e Persetujuan Amdal No.731 Tahun 2005 e Persetujuan RKAB untuk Tahun 2024-2026 Nomor: T-1793/MB.04/DJB.M/2024 tanggal 14 Oktober 2024 » DPM telah mendapatkan Persetujuan Tekno- Ekonomi Dokumen Studi Kelayakan Kontrak Karya PT Dairi Prima Mineral berdasarkan Surat Persetujuan No. 2150/30/DBM/2015 e Tahap kegiatan PT DPM disesuaikan menjadi Tahap Operasi Produksi berdasarkan Surat Keputusan Menteri Energi dan Sumber Daya Mineral No. 456.K/30/DJB/2017 e Letter AMDAL Approval No. 731-2005 » DPM 2024-2026 work plan approval (RKAB) No. T-1793/MB.04/DJB.M/2024, 14 October 2024. e Letter from Direktorat Jenderal Mineral dan Batubara No. 2150/30/DBM/2015 awarding Techno-Economic Approval of Feasibility Study Document Contract of Work of PT DPM has already been received, e PT DPM work activity has already been adjusted became Operation Production Phase based on Decree of Energy and Mineral Resources Minister No. 456.K/30/DJB/2017
Page 6 OCR 0.903
(SP BRM II. PT Gorontalo Minerals Nama Perusahaan PT Gorontalo Minerals (“PT GM") (Name of Company) Tahap Kegiatan KK (Phase of Activity of Contract of Work) Laporan Eksplorasi Bulan Operasi Produksi (Production Operation) April — Juni (AprJune) 2025 (Monthly Exploration Report) A. | Daerah Eksplorasi Exploration Areas 1. Kompleks Cabang Kiri, Blok I (Tombulialto), | 1. Cabang Kiri Complex, Block 1 (Tombulilato), Gorontalo Gorontalo 2. Kompleks Motomboto, Blok I (Tombulilato), | 2. Motomboto Complex, Block 1 (Tombulilato), Gorontalo Gorontalo 3. Kompleks Sungai Mak, Blok I (Tombulialto), | 3. Sungai Mak Complex, Block 1 (Tombulilato), Gorontalo Gorontalo 4. Prospek Kayubulan, Blok 1 (Tombulilato), | 4. Kayubulan Prospect, Block 1 (Tombulilato), Gorontalo Gorontalo 5. Area Anomali Gunung Lintah, Blok 1| 5. Gunung Lintah Anomaly Area, Blok 1 (Tombulilato), Gorontalo (Tombulilato), Gorontalo B. | Biaya Eksplorasi Exploration Costs 1.729.671,05 Dolar AS USD 1,729,671.05 C. | Bentuk Kegiatan Eksplorasi Form of Exploration Activities 1. Melakukan pengeboran eksplorasi di area | 1. Conducting exploration drilling in Cabang Kiri Prospek Cabang Kiri East, Blok 1 East Prospect area, Block 1 Tombulilato with Tombulilato dengan total kedalaman current drilling progress 5,839.30 metres from pengeboran saat ini 5.839,30 meter dari total rencana 67.612,30 meter dan telah menyelesaikan empat lubang bor dari total 69 rencana lubang bor. 2. Melakukan pengeboran geotek di area Kompleks Motomboto, Blok I Tombulilato dengan total kedalaman pengeboran 736,35 meter sebanyak 18 lubang bor. 3. Memulai pengeboran sterilisasi di area Kompleks Motomboto dan Kompleks Sungai Mak, Blok | Tombulilato dengan total kedalaman saat ini 1.996,30 meter dari total rencana 2.350 meter dan telah menyelesaikan 12 lubang bor dari total 13 rencana lubang bor. 4. Melanjutkan pemetaan geologi dan pengambilan sampel batuan permukaan di area Prospek Kayubulan, area Anomali Gunung Lintah dan area Kompleks Cabang Kiri, Blok I Tombulilato . Conducting a total newest plan of 67,612.30 metres and already completed four drill holes out of 69 planned drill holes. geotechnical — drilling in Motomboto Complex Area Block 1 Tombulilato, with a total drilling depth of 736.35 meters from 18 drill holes. . Starting sterilization drilling in Motomboto Complex area and Sungai Mak Complex area Block 1 Tombulilato with current drilling progress 1,996.30 meters out of a planned 2,350 meters and already completed 12 holes out of 13 planned drill holes. . Continuing geological mapping and surface rock samples collecting in Kayubulan Prospect area, Gunung Lintah Anomaly area, and Cabang Kiri Complex area, Block 1 Tombulilato. 1
Page 7 OCR 0.918
(SP BRM 5. Melanjutkan kegiatan ridge spur soil| 5. Continuing ridge spur soil sampling at sampling pada area Prospek Kayubulan, Kayubulan Prospect area, Gunung Lintah area Anomali Gunung Lintah dan area Anomaly area, and Cabang Kiri Complex area, Kompleks Cabang Kiri, Blok | Tombulilato. Block I Tombulilato. 6. Total sampel pengeboran Prospek Cabang | 6. A total of 2,210 core samples from Cabang Kiri East, Blok | Tombulilato sebanyak Kiri East Prospect, Block 1 Tombulilato have 2.210 conto inti bor telah dikirimkan ke been sent to the PT Geoservices Laboratory for Laboratorium PT Geoservices untuk analisis geochemical analysis. geokimia. 7. Total sampel batuan permukaan sebanyak | 7. A tota/ of 1,921 surface rock samples from 1.921 sampel dari Kompleks Sungai Mak, Sungai Mak Complex, Kayubulan Prospect, Prospek Kayubulan, area Anomali Gunung Gunung Lintah Anomaly area and Cabang Kiri Lintah, dan Kompleks Cabang Kiri Blok I Complex Block I Tombulilato have been sent Tombulilato yang telah dikirimkan ke to PT Geoservices Laboratory for geochemical Laboratorium PT Geoservices untuk analisis analysis. geokimia 8. Total sampel tanah sebanyak 1.441 sampel | 8. A total of 1,441 soil samples from Sungai Mak dari Kompleks Sungai Mak, Prospek Complex, Kayubulan Prospect, Gunung Lintah Kayubulan, area Anomali Gunung Lintah, Anomaly area, and Cabang Kiri Complex Block dan Kompleks Cabang Kiri, Blok I 1 Tombulilato have been sent to PT Geoservices Tombulilato —— telah dikirimkan ke Laboratory for geochemical analysis. Laboratorium PT Geoservices untuk analisis geokimia. 9. Melanjutkan uji metalurgi tahap II dengan | 9. Continuing the second phase of metallurgical berkooridinasi bersama tim penyusun BED testing in coordination with the BED Heap Heap Leach Project untuk big column test Leach Project team for the big column test for terhadap sampel dengan komposisi 2 2 composite samples of Motomboto North sampel komposit dari Prospek Motomboto Prospect and 3 composite samples of North dan 3 sampel komposit dari Prospek Motomboto East Prospect, Block I Tombulilato. Motomboto East, Blok | Tombulilato. 10. Melanjutkan estimasi sumber daya dan | 10.Continuing the estimation of mineral cadangan — mineral — untuk — Prospek resources and reserves for Motomboto East Motomboto East dan Motomboto North, and Motomboto North Prospects, as well as serta domain oxide dari Prospek Sungai the oxide domain of Sungai Mak Prospect, Mak Blok I Tombulilato. Block I Tombulilato. 11. Melakukan pengujian conto tanah terkait | 11. Conducting soil sample testing to supoort the kebutuhan BED untuk desain timbunan BED reguirements for the leach pad design in leach pad di Kompleks Motomboto, Blok I the Motomboto Complex, Block I Tombulilato. Tombulilato. 12. Memulai proses peninajauan area PIPPIB | 12. Starting revew process for the PIPPIB area and dan pengajuan PPKH eksplorasi. submit the application for exploration PPKH. Pihak-Pihak yang Terlibat Parties Involved 1. PT Sumagud Sapta Sinar. 1. PT Sumagud Sapta Sinar. 2. PT Minera Nusa Drillindo. 2. PT Minera Nusa Drillindo. 3. Laboratorium PT Geoservices. 3. PT Geoservices Laboratory. 4. Laboratorium Geomekanika ITB. 4. Laboratorium Geomekanika ITB. 5. PT Soilens. 5. PT Soilens. 6. PT Solusi Geotek Optima. 6. PT Solusi Geotek Optima 7. PT Jarvis Sinergi Yasa 7. PT Jarvis Sinergi Yasa.
Page 8 OCR 0.912
(SP BRM Metode Pengujian dan Pemilihan Areal Testing Method and Selection of Area Kemajuan Triwulan Sebelumnya Eksplorasi Terhadap Kegiatan Exploration Progress toward Previous Guarter's Activities 1. Kemajuan aktivitas pengeboran eksplorasi di Prospek Cabang Kiri East, Blok | Tombulilato mencakup penambahan 1 lubang bor dengan total kedalaman 2.489,80. Pengeboran geotek di area Prospek Motomboto North dan Motomboto East, Blok I Tombulilato dengan total kedalaman pengeboran 736,35 meter sebanyak 18 lubang bor Penambahan jumlah sampel sebanyak 979 sampel dari hasil pengeboran pada Prospek Cabang Kiri East, Blok I Tombulilato yang dikirim ke Laboratorium PT Geoservices untuk dianalisis. . Penambahan jumlah sampel — batuan permukaan sebanyak 76 sampel dari Prospek Kayubulan, area Anomali Gunung Lintah dan Kompleks Cabang Kiri, Blok | Tombulilato yang telah dikirimkan ke Laboratorium PT Geoservices untuk analisis geokimia dalam periode ini. . Penambahan jumlah sampel tanah sebanyak 353 sampel dari Prospek Kayubulan, Area Anomali Gunung Lintah, dan Kompleks Cabang Kiri, Blok I Tombulilato yang telah dikirimkan ke Laboratorium PT Geoservices untuk analisis geokimia dalam periode ini. . Menyelesaikan uji metalurgi berupa column test dan sedang dilakukan assesment oleh tim BED sebagai basis parameter dalam design pabrik heap leach di Prospek Motomboto North dan Motomboto East, Blok I Tombulilato. 7 The progress of drilling activities in Cabang Kiri East Prospect area, Block 1 Tombulilato Induded the addition of one hole with total depth of 2, 489.80 metres. Geotechnical drilling in Motomboto North and Motomboto East prospect areas, Block 1 Tombulilato, with a total drilling depth of 736.35 meters across 18 drill holes. . An additional 979 samples from the drilling result at Cabang Kiri £ast Prospect, Block 1 Tombulilato which were sent to the Geoservices Laboratory for analysis. . An additional 76 surface rock samples were collected from Kayubulan Prospect, Gunung Lintah Anomaly area, and Cabang Kiri Complex Block 1 Tombulilato, and have been sent to PT Geoservices Laboratory for geochemical analysis during this period. . An additional 353 soil samples from the Kayubulan Prospect, Gunung Lintah Anomaly area, and the Cabang Kiri Complex, Block 1 Tombulilato, were sent to PT Geoservices Laboratory for geochemical analysis during this period. . Completing metallurgical testing in the form of a column test, currentiy being assessed by the BED team as a basis for parameter design of the heap leach plant at the Motomboto North and Motomboto East prospects, Block / Tombulilato. Rencana Selanjutnya Next Plan 1. Melanjutkan pengeboran eksplorasi di area Kompleks Cabang Kiri, Blok I Tombulilato. . Melanjutkan kegiatan pemetaan geologi dan pengambilan sampel batuan permukaan di area Kompleks Cabang Kiri, Blok | Tombulilato. . Melanjutkan kegiatan ridge spur soil sampling pada Kompleks Cabang Kiri dan akan memulai kegiatan ridge spur soil sampling di Area Mono Anomaly, Blok | 1 Continuing exploration drilling in Cabang Kiri Complex area, Block I Tombulilato. Continuing geological mapping and surface rock sampling in Cabang Kiri Complex area, Block 1 Tombulilato. Continuing ridge spur soil sampling at Cabang Kiri Complex and begin the ridge spur soil sampling at Mono Anomaly area Block I Tombulilato. A4
Page 9 OCR 0.894
(SS BRM Tombulilato. 4. Melanjutkan proses BED untuk design | 4. Continuing the BED process for the heap pabrik heap leach di Prospek Motomboto leach plant design at Motomboto North and North dan Motomboto East, Blok 1 Motomboto East prospects, Block 1 Tombulilato. Tombulilato. 5. Melanjutkan estimasi sumber daya dan | 5. Continuing mineral resource and reserve cadangan mineral untuk Prospek estimation for the Motomboto East and Motomboto North dan Motomboto East, Motomboto North Prospects, as well as the serta domain oxide dari Prospek Sungai oxide domain of the Sungai Mak Prospect. Mak. 6. Melanjutkan proses peninjauan area PIPPIB | 6. Continuing the review process for the PIPPIB dan pengajuan PPKH eksplorasi. area and the submission of the exploration PPKH application. 7. Melakukan Studi Kelayakan dan AMDAL | 7. Conducting a Feasibility Study and AMDAL untuk Kompleks Motomboto Blok I for the Motomboto Complex, Block 1 Tombulilato Tombulilato. Hambatan Eksplorasi Barriers to Exploration 1. Adanya aktivitas Penambangan Tanpa Izin (PETI) di area rencana pengeboran Kompleks Motomboto, Blok I Tombulilato. 2. Munculnya aktivitas Penambangan Tanpa Izin (PETI) baru di area sepanjang jalur bukaan jalan perintis. ts An Illegal Mining Activity (PETI) in the drilling planned area of Motomboto Complex of Block I Tombullato. New Illegal Mining Activity (PETI) in the opening area alongside the pioneering road construction. Perizinan/Persetujuan Baru Yang Diperoleh New Permits/Approvals Acguired Te NT
Page 10 OCR 0.901
IV.
Nama Perusahaan
(SP BRM
PT Linge Mineral Resources
(Name of Company
Tahap Kegiatan IUP
(Phase of Activity of Mining Permit
Laporan Eksplorasi Periode
(Period of Exploration Report)
PT Linge Mineral Resources ("PT LMR”)
Eksplorasi (Exploration)
April — Juni (Apr-June) 2025
A. | Daerah Eksplorasi Exploration Areas
1. Prospek Bulan (Proyek Abong) 1. Bulan Prospect (Abong Project)
2. Prospek Bintang 1 (Proyek Abong) 2. Bintang 1 Prospect (Abang Project)
3. Prospek Bintang 2 (Proyek Abong) 3. Bintang 2 Prospect (Abong Project)
4. Eksplorasi Regional (Semua Lokasi dalam IUP) 4, Regional Exploration (Located by IUP)
B. | Biaya Eksplorasi Exploration Cost
148.637 Dolar AS USD 148,637
C. | Bentuk Kegiatan Eksplorasi Form of Exploration Activities
1. Memulai kegiatan pengeboran studi tahap 2 | 7. Starting drilling stuay activities stage 2 to for
untuk studi metalurgi dan geotek tambahan, additional metallurgical and geotechnical
di dalam Proyek Abong dengan kedalaman studies in the Abong Project at a depth 40-80
40-80 meter. meters.
2. Melakukan analisis geofisika dan mineralisasi | 2. 'Conducting geophysical and mineralization
yang disusun oleh konsultan Fathom analysis prepared by Fathom Geophysic
Geophysic. Laporan on progress. consultants. Report on progress.
3. Studi Sinkhole, Geoteknik, Hidrologi, dan | 3. Sinkhole, Geotechnical, Hydrological, and
Hidrogeologi yang dilakukan oleh konsultan Hydrogeological studies conducted by
PT Jarvis Sinergi Yasa. Laporan on progress. consultant PT Jarvis Sinergi Yasa. Report on
progress.
4. Sebanyak 323 sampel batuan inti dari hasil | 4. AA Total of 323 core samples study from
pemboran dikirimkan ke Laboratorium PT drilling results have been sent to PT
Geoservices untuk analisis geokimia. Geoservices Laboratory for geochemical
analysis.
5. Sebanyak 172 sampel batuan dikirimkan ke | 5. A total of 172 rock samples were sent to the
Laboratorium PT Geoservices untuk analisis PT Geoservices Laboratory for metallurgical
metalurgi analysis.
6. Sebanyak 244 sampel pemetaan geologi | & 'A total of 244 geological mapping samples
telah dikirimkan ke Laboratorium PT were sent to the PT Geoservices Laboratory
Geoservices untuk analisis geokimia. for geochemical analysis.
7. Melanjutkan kegiatan pemetaan geologi detil | 7. Continuing detailed and semi detailed
dan semi detil di area prospek East Bulan geological mapping activities in the East Bulan
(Kapar), North Bulan, dan North Kapar. (Kapar), North Bulan, and North Kapar
prospect area.
D. | Pihak-Pihak yang Terlibat Involved Parties
PT Bahtera Ratu Engineering
PT Geoservices
PT Namsuma Luban Abadi
PT Jarvis Sinergi Yasa (Geotek-hidro studi)
PT Bahtera Ratu Engineering
PT Geoservices
PT Namsuma Luban Abadi
PT Jarvis Sinergi Yasa (Geotech-hydro study)
Van
Page 11 OCR 0.884
(SS BRM Metode Pengujian dan Pemilihan Areal Testing Method and Selection Area - Spedific Gravity - Fire Assay - CN each - ICP OES 4 Acid Trace - Uji Pulverized Bottle Roll Testwork - Specific Gravity - Fire Assay - CN Leach - ICP OES 4 Acid Trace - Pulverized Bottle Roll Testwork Kemajuan Eksplorasi Terhadap Kegiatan Triwulan Sebelumnya Exploration Progress toward the Preceding Guarter Activities 1. Melakukan pengeboran dengan 1 Rig dengan kedalaman maksimal 80m 2. Laporan studi geofisika dan mineralisasi yang disusun oleh konsultan Fathom Geophysic on progress. 3. Laporan Studi Sinkhole, Geoteknik, Hidrologi, dan Hidrogeologi yang disusun oleh konsultan PT Jarvis Sinergi Yasa on progress. 4. Menyelesaikan analisis geokimia 253 sampel batuan inti di Laboratorium PT Geoservices. 5. Menyelesaikan analisis geokimia 151 sampel batuan pemetaan geologi di Laboratorium PT Geoservices. 6. Melanjutkan kegiatan pemetaan geologi detil dan semi detil di area Project Abong, prospek East Bulan (Kapar), North Bulan, dan North Kapar 7. Mendapatkan Persetujuan Adendum Studi Kelayakan oleh Direktorat Jenderal Mineral dan Batubara. 8. Mendapatkan Persetujuan Teknis tentang Baku Mutu Air Limbah (BMAL). 9. Penambahan fasilitas pendukung — untuk operasional pengeboran (coreshed, camp karyawan) 1. Drilling with 1 Rig with a maximum depth of 80m. 2. Geophysical and mineralization study reports prepared by consultant Fathom Geophysic are in progress. 3. Sinkhole, Geotechnical, Hydrological, and Hydrogeological Study Reports prepared by consultant PT Jarvis Sinergi Yasa are in progress. 4. Completed geochemical analysis of 253 core rock samples at the PT Geoservices Laboratory. 5. Completed geochemical analysis of 151 geological mapping rock samples at the PT Geoservices Laboratory. 6. Continuing detailkd and semi detailed Geological mapping activities in the Project Abong area, prospek East Bulan (Kapar), North Bulan, dan North Kapar. 7. Obtained Approval of the Feasibility Study Addendum from the Directorate General of Minerals and Coal. 8. Obtained Technical Approval for Wastewater Guality Standards (BMAL). 9. Added supporting fadlities for Operations (coreshed, employee camp). drilling Rencana Selanjutnya Next Plan 1. Melanjutkan kegiatan pengeboran studi Tahap 2 untuk studi metalurgi dan geotek tambahan, di dalam Proyek Abong dengan rata rata kedalaman 40-80 meter. 2. Finalisasi laporan analisis petrografi dan mineralisasi yang disusun oleh konsultan Fathom Geophysic. 3. Finalisasi draft laporan Studi Sinkhole, Geoteknik, Hidrologi, dan Hidrogeologi yang disusun oleh PT Jarvis Sinergi Yasa. 4. Melanjutkan studi untuk memenuhi kebutuhan AMDAL meliputi Studi Geoteknik, Hidrogeologi, dan Metalurgi. 1. Continue drilling study activities stage 2 to for additional metallurgical and geotechnical studies in the Abong Project at a depth 40-80 meters. 2. Finalize the Petrography and mineralization analysis report prepared by consultant Fathom Geophysics. 3. Finalize the draft Sinkhole, Geotechnical, Hydrological, and Hyarogeological Study reports prepared by PT Jarvis Sinergi Yasa. 4. Continue studies io meet the AMDAL reguirements, including Geotechnical, Hydrogeological, and Metallurgical Studies. "& ri
Page 12 OCR 0.907
(SP BRM 5. Melanjutkan kegiatan pemetaan geologi detil dan semi detil di luar Prospek Abong, yaitu Abong Extension. 6. Melakukan kegiatan pengambilan sampel tanah menggunakan metode ridge and spur di luar Prospek Abong, yaitu Abong Extension. 7. Mendapatkan Persetujuan Lingkungan Surat Keputusan Kelayakan Lingkungan Hidup (SKKL). 8. Melanjutkan pembangunan — infrastruktur pendukung untuk kegiatan (coreshed, camp karyawan). 5. Continue detailed and semi detailed geological mapping outside the Abong Prospect area, spedifically in the Abong Extension. 6. Conduct soil sampling activities using the ridge and spur method outside the Abong Prospect, namely the Abong Extension. 7. Obtain Environmental Approval through the Environmental Feasibility Decree (SKKL). 8. Continue — construction — of supporting Infrastructure for activities (coreshed, employee camp) Hambatan Eksplorasi Barriers to Exploration 1. Penambangan Tanpa Izin (PETI) di Prospek Bulan. 2. Penambangan Tanpa Izin (PETI) di Area Sungai Utama dengan menggunakan alat berat. 3. Munculnya pihak ketiga yang mengakomodir PETI di Prospek Abong 4. Aktivitas Illegal Logging di Lokasi PT LMR. akan . There are Illegal Mining (PETI) activities in Bulan Prospect. 2. There are Illegal Mining (PETI) activities in Main River with heavy eguioment (Excavator) 3. The emergence of a third party that will accommodate PETI in the Abong Prospect. 4. There are Illegal Logging activities in LMR Area. Perizinan/Persetujuan Baru Yang Diperoleh New Permits/Approvals Acguired 1. Persetujuan Teknis Pemenuhan Baku Mutu Air Limbah yang dibuang ke Badan Air Permukaan PT Linge Mineral Resources — Nomor: S.157/F/F.1/PKL.2.12/8/4/2025 tanggal 11 April 2025. 2. Persetujuan Adendum Laporan Studi Kelayakan IUP PT Linge Mineral Resources. Nomor: B- 572/MB.04/DBM.PE/2025 tanggal 19 Mei 2025. 1. Technical Approval for Compliance with Guality Standards of Wastewater Discharged to Surface Water Bodies PT Linge Mineral Resources Number: SAS7/YF./PKL.2.12/8/4/2025 dated 11 April 2025. 2. Approval of Addendum to Feasibility Study of IUP PT Linge Mineral Resources Number: B- 572/MB.04/DBM.PE/2025 dated 19 May 2025. Ta
Page 13 OCR 0.913
(SP BRM
V. PT Suma Heksa Sinergi
Nama Perusahaan PT Suma Heksa Sinergi ("PT SHS")
(Name of Company)
Tahap Kegiatan IUP
(Phase of Activity of Mining Permit)
Operasi Produksi (Production Operation)
Laporan Eksplorasi Periode April — Juni (AprJune) 2025
(Period af Exploration Report)
Daerah Eksplorasi
Exploration Areas
1. Prospek Cisadang Central
2. Prospek Cisadang West
3. Prospek Pasir Awi
1. Cisadang Central Prospect
2. Cisadang West Prospect
3. Pasir Awi Prospect
Biaya Eksplorasi
Exploration Cost
237.762 Dolar AS
USD 237,762
Bentuk Kegiatan Eksplorasi
Form of Exploration Activities
1. Melakukan kegiatan pengeboran di prospek
Cisadang Central untuk program infill
sumberdaya
2. Melakukan kegiatan pengeboran di Prospek
Cisadang West untuk program pemboran studi
metalurgi dan infill sumberdaya.
3. Melanjutkan kegiatan pemetaan geologi detil
di prospek Pasir Awi.
4. Melakukan pengiriman sampel inti bor
sejumlah 1346 conto dari kegiatan pemboran
infill sumberdaya di prospek Cisadang Central
untuk analisa geokimia (Au, Ag) dengan
metode fire assay dan ICP OES.
5. Melakukan pengambilan conto batuan di
prospek Pasir Awi dan bersamaan dengan
pengiriman sebanyak 166 conto batuan yang
telah dikirimkan ke Laboratorium PT
Geoservices untuk analisis geokimia.
6. Melanjutkan kerjasama dengan konsultan
geoteknik dan hidrogeologi PT Jarvis untuk
studi di prospek Cisadang Central dan
Cisadang West.
7. Melakukan uji metalurgi — pendahuluan
Pulverized Bottle Roll Test (PBRT) dan Coarse
Bottle Roll Test (CBRT) dari data pengeboran
terdahulu di prospek Cisadang West.
8. Melanjutkan proses permohonan Persetujuan
Penggunaan Kawasan Hutan (PPKH) untuk
eksplorasi lanjutan.
1. Conducting drilling activities at the Cisadang
Central Prospect for infill resources program.
2. Conducting drilling activities at the Cisadang
West Prospect for metallurgical study and infill
resources program.
3. Continuing detail geological mapping activities
In Pasir Awi Prospect.
4. Sending a total 1346 drill core samples from
infill resources drilling program in Cisadang
Central prospect for geochemical analysis (Au,
Ag) with fire assay and ICP OES analysis
method.
5. Conducting surface rock samples collecting
and sending in Pasir Awi prospect with total
166 rock samples have been sent to PT
Geoservices Laboratory for geochemical
analysis.
6. Continuing to collaborate with geotechnic and
hyarogeology consultants of PT Jarvis for study
in Cisadang Central and Cisadang West
prospect.
7. Conducting preliminary metallurgical testwork
with Pulverized Bottle Roll Test (PBRT) and
Coarse Bottle Roll Test (CBRT) analysis in
Cisadang West prospect from historical
drillcore data.
8. Continuing the application process for Forest
Area Use Approval (PPKH) for further
exploration.
Page 14 OCR 0.919
(SP BRM Pihak-Pihak yang Terlibat Involved Parties 1. PT Namsuma Luban Abadi (Drilling Contractor) | 1. PT Namsuma Luban Abadi (Drilling Contractor) 2. Laboratorium PT Geoservices 2. PT Geoservices Laboratorium 3. PT Indomobil Prima Energi 3. PT Indomobil Prima Energi 4. Laboratorium LAPI ITB 4. LAPI ITB Laboratorium 5. PT KehatiLab Indonesia 5. PT Kehatilab Indonesia 6. PT Parama Asha Nirwana 6. PT Parama Asha Nirwana 7. PT AMS Mitra Sejahtera 7. PT AMS Mitra Sejahtera 8. CV Cipta Perdana Mandiri 8. CV Cipta Perdana Mandiri 9. CV Dwimitra Synergy 9. CV Dwimitra Synergy Metode Pengujian dan Pemilihan Areal Testing Method and Selection Area - Fire Assay - Fire Assay - Agua Regia Digest - Agua Regia Digest - ICP OES multi elemen - ICP OES multi element - CN Leach - CN Leach - Specific Gravity - Specific Gravity Kemajuan Eksplorasi Terhadap Kegiatan Triwulan Sebelumnya Exploration Progress toward the Preceding Guarter Activities 1. Menyelesaikan kegiatan pengeboran jnfil/ sumberdaya di prospek Cisadang Central menggunakan 1 Rig dengan jumlah 22 lubang bor dari total 44 rencana lubang bor dengan total kedalaman yang terealisasi 5165.80 meter. 2. Memulai kegiatan pengeboran studi metalurgi, geoteknik, hidrogeologi dan jnfil/ sumberdaya di prospek Cisadang West menggunakan 1 Rig dan telah menyelesaikan 3 lubang bor dari total 5 rencana lubang bor dengan total kedalaman yang terealisasi 890 meter. 3. Menyelesaikan kegiatan pemetaan geologi detil di prospek Pasir Awi 4. Memulai kegiatan pemetaan geologi detil di prospek Pasir Karang 5. Penambahan jumlah sampel pengeboran di prospek Cisadang Central sebanyak 1346 conto untuk analisa geokimia yang telah dilakukan analisa oleh PT Geoservices. 6. Penambahan jumlah sampel batuan permukaan di prospek Pasir Awi sebanyak 166 conto untuk analisa geokimia yang telah dilakukan analisa oleh PT Geoservices. 7. Melanjutkan kegiatan rekonstruksi core dari pengeboran sebelumnya. 8. Menyelesaikan uji metalurgi Pulverized Bottle Roll Test (PBRT) dan Coarse Bottle Roll Test (CBRT) dari data pengeboran terdahulu di prospek Cisadang West 1. Completing infill resources drilling program in Cisadang Central prospect used 1 Rig and completed 22 of 44 planned drill holes with total achieved depth at 5165.80 meter. 2. Initial drilling activities at Cisadang West Prospect for infill resources, metallurgy, geotechnic, and hydrogeology studies drilling program and already completed 3 drillholes of 5 planned drill holes with total realized depth at 890 metres. 3. Completing detailed geological mapping activities in Pasir Awi prospect. 4. Initial detail geological exploration mapping activity in Pasir Karang prospect. 5. Additional drill core samples from Cisadang Central Prospect with total 1346 samples for geochemical analysis and have been sent to PT Geoservices Laboratory. 6. Additional rock surface samples from Pasir Awi prospect with total 166 samples for geochemical analysis and have been sent to PT Geoservices Laboratory. Z. Continuing core reconstruction from historical drillhole. 8. Completing preliminary metallurgical testwork with Pulverized Botile Roll Test (PBRT) and Coarse Bottle Roll Test (CBRT) analysis in Cisadang West prospect from historical
Page 15 OCR 0.906
(SS BRM drillcore data. Rencana Selanjutnya Next Plan 1. Melanjutkan kegiatan pengeboran di Prospek Cisadang West untuk program pemboran metalurgi, sumberdaya, geoteknik — dan hidrogeologi. 2. Melanjutkan kegiatan evaluasi hasil pemetaan geologi detil di Prospek Pasir Awi. 3. Melanjutkan kegiatan pemetaan geologi detil di Prospek Pasir Karang 4. Melakukan uji metalurgi di prospek Cisadang West menggunakan data pengeboran terbaru. 5. Melanjutkan kegiatan rekonstruksi — core pengeboran dari kegiatan pengeboran terdahulu. 6. Melanjutkan proses permohonan Persetujuan Penggunaan Kawasan Hutan (PPKH) untuk eksplorasi lanjutan 1. Continue drilling activities at the Cisadang West Prospect for metallurgical, resource, geotechnical and hydrogeological drilling programs. 2. Continue evaluation progress from detail geological mapping at Pasir Awi prospect. 3. Continue detail geological exploration mapping activity in Pasir Karang prospect. 4. Conducting metallurgical testwork at Cisadang West prospect with new drill hole data. 5. Continuing — core drilling — reconstruction activities from previous drilling activities. 6. Continue the application process for Forest Area Use Approval (PPKH) for further exploration. Hambatan Eksplorasi Barriers to Exploration 1. Terdapat tumpang tindih area dengan PT Jascleans untuk area pembangkit litrik tenaga micro hyadro yang berada disekitar Sungai Ciliman di area prospek Cisadang Central. 2. Terdapat tumpang tindih dan aktifitas penambangan aktif komoditi andesit oleh PT Mandala Putra Persada (MPP) dengan izin OP (Operasi Produksi) seluas 9.9 Ha yang berada di area prospek Pasir Karang. 3. Keberadaan lokasi IUP PT SHS berada di dekat area pemukiman masyakat. 1. Overlaoping with PT Jascleans for micro hydro power plant area around Ciliman River at Cisadang Central prospect area. 2. There are overlapping and active mining activities for andesite — commodity by PT Mandala Putra Persada (MPP) with production permit covering area 9.9 ha located in Pasir Karang prospect area. 3. The location of the IUP PT SHS is near a community residential area. Perizinan/ Persetujuan Baru Yang Diperoleh New Permits/Approvals Acguired
Names mentioned 43 people and organisations named in the text · linked when the evidence is strong
unresolved
org
PT Citra Palu Minerals Nama Perusahaan
p.1
unresolved
org
PT Citra Palu Minerals
p.1
unresolved
org
PT Geoservices.
p.2 ×23
unresolved
org
PT Geoservices Laboratory.
p.2 ×15
unresolved
org
PT CPM Laboratory Pihak-Pihak
p.2
unresolved
org
PT CPM Laboratory
p.2
unresolved
org
PT Sumagud Sapta Sinar
p.2 ×4
unresolved
org
PT Geoservices Lahoratory
p.2
unresolved
org
PT IOL Indonesia
p.2 ×2
unresolved
org
PT SN Cargo
p.2
unresolved
org
PT SN Cargo Metode Pengujian
p.2
unresolved
org
PT. Dairi Prima Mineral
p.4 ×2
unresolved
org
PT Dairi Prima Mineral Operasi Produksi
p.4
unresolved
org
PT DPM
p.5 ×3
unresolved
org
Menteri Energi dan Sumber Daya Mineral
p.5
unresolved
org
Direktorat Jenderal Mineral
p.5 ×2
unresolved
org
PT Gorontalo Minerals Nama Perusahaan
p.6
unresolved
org
PT Gorontalo Minerals
p.6
unresolved
org
PT GM
p.6
unresolved
org
PT Geoservices Tombulilato
p.7
unresolved
org
PT Minera Nusa Drillindo.
p.7 ×2
unresolved
org
PT Soilens.
p.7 ×2
unresolved
org
PT Solusi Geotek Optima.
p.7 ×2
unresolved
org
PT Jarvis Sinergi Yasa
p.7 ×10
unresolved
org
PT Linge Mineral Resources
p.10 ×6
unresolved
org
PT LMR
p.10 ×2
unresolved
org
PT Geoservices Laboratory Geoservices
p.10
unresolved
org
PT Bahtera Ratu Engineering
p.10 ×2
unresolved
org
PT Namsuma Luban Abadi
p.10 ×4
unresolved
org
Directorate General of Minerals and Coal.
p.11
unresolved
org
PT Suma Heksa Sinergi Nama Perusahaan
p.13
unresolved
org
PT Suma Heksa Sinergi
p.13
unresolved
org
PT SHS
p.13 ×3
unresolved
org
PT Jarvis
p.13 ×2
unresolved
org
PT Geoservices Laboratorium
p.14
unresolved
org
PT Indomobil Prima Energi
p.14 ×2
unresolved
org
PT KehatiLab Indonesia
p.14 ×2
unresolved
org
PT Parama Asha Nirwana
p.14 ×2
unresolved
org
PT AMS Mitra Sejahtera
p.14 ×2
unresolved
org
PT Geoservices Laboratory. Z. Continuing
p.14
unresolved
org
PT Jascleans
p.15 ×2
unresolved
org
PT Mandala Putra Persada
p.15 ×2